Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 93
1:1274 Distance Code Observation Grade
105.0 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4 107.6 F01 DAGS Deposits Attached Grease, 5% of cross sectional area from 4 o'clock to 5 o'clock, within 8 inch, Finish
M2
107.6 F02 DAGS Deposits Attached Grease, 5% of cross sectional area from 7 o'clock to 8 o'clock, within 8 inch, Finish
M2
111.5 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4 142.3 FM Fracture Multiple from 12 o'clock to 4 o'clock, within 8 inch S4 148.1 FM Fracture Multiple from 8 o'clock to 5 o'clock, within 8 inch S4 153.0 B Broken from 1 o'clock to 4 o'clock, within 8 inch S4 185.0 FM Fracture Multiple from 10 o'clock to 4 o'clock, within 8 inch S4 189.6 FM Fracture Multiple from 9 o'clock to 4 o'clock, within 8 inch S4 217.8 S03 MWLS Miscellaneous Water Level, Sag, 25% of the vertical dimension, Start
232.1 FM Fracture Multiple from 9 o'clock to 1 o'clock, within 8 inch S4 236.4 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 256.7 FM Fracture Multiple from 9 o'clock to 2 o'clock, within 8 inch S4 261.7 F03 MWLS Miscellaneous Water Level, Sag, 25% of the vertical dimension, Finish
S2
261.7 FM Fracture Multiple from 8 o'clock to 12 o'clock, within 8 inch S4 272.2 FM Fracture Multiple from 8 o'clock to 3 o'clock, within 8 inch S4 289.5 FS Fracture Spiral from 2 o'clock to 4 o'clock, within 8 inch S3 297.1 S04 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 5 o'clock, within 8 inch, Start / Wandering 297.1 S05 DAGS Deposits Attached Grease, 5% of cross sectional area from 7 o'clock to 9 o'clock, within 8 inch, Start / Wandering 330.5 FM Fracture Multiple from 12 o'clock to 4 o'clock, within 8 inch S4 12/7/2023 Grant Light U-0417-07007899 7016 - 7014
No Pre-Cleaning Downstream 678.00 ' 678.00 '
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 94
1:1274 Distance Code Observation Grade
340.7 S06 MWLS Miscellaneous Water Level, Sag, 25% of the vertical dimension, Start
346.7 FS Fracture Spiral from 2 o'clock to 4 o'clock, within 8 inch S3 399.2 FS Fracture Spiral from 10 o'clock to 11 o'clock, within 8 inch S3 414.7 FM Fracture Multiple from 10 o'clock to 4 o'clock, within 8 inch S4 419.4 FM Fracture Multiple from 11 o'clock to 3 o'clock, within 8 inch S4 430.2 FS Fracture Spiral from 7 o'clock to 10 o'clock, within 8 inch S3 440.2 FS Fracture Spiral from 2 o'clock to 4 o'clock, within 8 inch S3 456.4 FM Fracture Multiple from 9 o'clock to 4 o'clock, within 8 inch S4 460.9 FM Fracture Multiple from 10 o'clock to 4 o'clock, within 8 inch S4 463.5 F04 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 5 o'clock, within 8 inch, Finish / Wandering M2
463.5 F06 MWLS Miscellaneous Water Level, Sag, 25% of the vertical dimension, Finish
S2
463.5 F05 DAGS Deposits Attached Grease, 5% of cross sectional area from 7 o'clock to 9 o'clock, within 8 inch, Finish / Wandering M2
466.0 FM Fracture Multiple from 8 o'clock to 1 o'clock, within 8 inch S4 476.7 FM Fracture Multiple from 10 o'clock to 4 o'clock, within 8 inch S4 491.7 FM Fracture Multiple from 8 o'clock to 3 o'clock, within 8 inch S4 518.7 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 537.4 S08 MWLS Miscellaneous Water Level, Sag, 35% of the vertical dimension, Start
543.7 FM Fracture Multiple from 8 o'clock to 2 o'clock, within 8 inch S4 570.6 FM Fracture Multiple from 10 o'clock to 4 o'clock, within 8 inch S4 570.6 F08 MWLS Miscellaneous Water Level, Sag, 35% of the vertical dimension, Finish
S3
12/7/2023 Grant Light U-0417-07007899 7016 - 7014
No Pre-Cleaning Downstream 678.00 ' 678.00 '
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 95
1:1274 Distance Code Observation Grade
592.1 FM Fracture Multiple from 8 o'clock to 3 o'clock, within 8 inch S4 607.8 FM Fracture Multiple from 11 o'clock to 2 o'clock, within 8 inch S4 616.0 S09 MWLS Miscellaneous Water Level, Sag, 20% of the vertical dimension, Start
634.7 FL Fracture Longitudinal at 2 o'clock, within 8 inch S3 654.6 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 659.9 FM Fracture Multiple from 11 o'clock to 3 o'clock, within 8 inch S4 664.7 FM Fracture Multiple from 8 o'clock to 2 o'clock, within 8 inch S4 674.1 F09 MWLS Miscellaneous Water Level, Sag, 20% of the vertical dimension, Finish
S2
678.0 AMH Manhole / 7014
12/7/2023 Grant Light U-0417-07007899 7016 - 7014
No Pre-Cleaning Downstream 678.00 ' 678.00 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4F3A 2Q00 290.0 180.0 470.0 2.9 2.0 2.5
7014
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 113
City: McFarland Drainage Area: Upstream MH: 7018
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7016
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:2550 Distance Code Observation Grade
0.0 AMH Manhole / 7018
0.0 MWL Water Level, 20% of the vertical dimension
11.2 B Broken from 7 o'clock to 5 o'clock, within 8 inch S4
21.4 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4
42.7 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4
53.4 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4
74.9 FS Fracture Spiral from 12 o'clock to 4 o'clock S3 111.0 FM Fracture Multiple from 11 o'clock to 4 o'clock, within 8 inch S4 159.5 MWL Water Level, 15% of the vertical dimension
205.1 MWL Water Level, 20% of the vertical dimension
209.8 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch
M2
219.7 S01 MWLS Miscellaneous Water Level, Sag, 30% of the vertical dimension, Start
237.6 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4 254.0 S02 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start
254.0 S03 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Start
325.8 F01 MWLS Miscellaneous Water Level, Sag, 30% of the vertical dimension, Finish
S2
12/6/2023 Grant Light U-0417-07007899 7018 - 7016
No Pre-Cleaning Downstream 677.40 ' 677.40 '
7018
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 114
1:2550 Distance Code Observation Grade
349.9 F02 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish
M2
349.9 F03 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Finish
M2
367.4 FS Fracture Spiral from 2 o'clock to 5 o'clock, within 8 inch S3 393.7 S04 MWLS Miscellaneous Water Level, Sag, 40% of the vertical dimension, Start
399.2 FS Fracture Spiral from 8 o'clock to 10 o'clock, within 8 inch S3 409.0 FM Fracture Multiple from 8 o'clock to 2 o'clock, within 8 inch S4 428.9 F04 MWLS Miscellaneous Water Level, Sag, 40% of the vertical dimension, Finish
S3
429.7 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 454.1 FM Fracture Multiple from 8 o'clock to 2 o'clock, within 8 inch S4 470.9 FM Fracture Multiple from 1 o'clock to 5 o'clock, within 8 inch S4 491.7 S05 MWLS Miscellaneous Water Level, Sag, 45% of the vertical dimension, Start
497.8 FS Fracture Spiral from 10 o'clock to 2 o'clock, within 8 inch S3 518.4 FM Fracture Multiple from 12 o'clock to 4 o'clock, within 8 inch S4 523.7 FM Fracture Multiple from 10 o'clock to 2 o'clock, within 8 inch S4 533.0 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 560.7 FM Fracture Multiple from 10 o'clock to 4 o'clock, within 8 inch S4 579.3 F05 MWLS Miscellaneous Water Level, Sag, 45% of the vertical dimension, Finish
S3
580.6 FM Fracture Multiple from 8 o'clock to 2 o'clock, within 8 inch S4 591.1 FM Fracture Multiple from 8 o'clock to 3 o'clock, within 8 inch S4 613.1 FS Fracture Spiral from 2 o'clock to 5 o'clock, within 8 inch S3 12/6/2023 Grant Light U-0417-07007899 7018 - 7016
No Pre-Cleaning Downstream 677.40 ' 677.40 '
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 115
1:2550 Distance Code Observation Grade
626.1 S06 MWLS Miscellaneous Water Level, Sag, 25% of the vertical dimension, Start
633.3 S07 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Start
633.3 S08 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start
655.3 F07 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Finish
M2
655.3 F08 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish
M2
664.1 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 668.5 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 674.3 F06 MWLS Miscellaneous Water Level, Sag, 25% of the vertical dimension, Finish
S2
677.4 AMH Manhole / 7016
12/6/2023 Grant Light U-0417-07007899 7018 - 7016
No Pre-Cleaning Downstream 677.40 ' 677.40 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4B3E 2H00 224.0 94.0 318.0 2.8 2.0 2.5
7016
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 128
City: McFarland Drainage Area: Upstream MH: 7020
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7018
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:1525 Distance Code Observation Grade
0.0 AMH Manhole / 7020
0.0 MWL Water Level, 40% of the vertical dimension
36.6 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4
43.5 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4
58.1 FL Fracture Longitudinal at 1 o'clock, within 8 inch S3
60.1 MWL Water Level, 35% of the vertical dimension
62.1 FS Fracture Spiral from 12 o'clock to 4 o'clock, within 8 inch S3
84.7 MWL Water Level, 25% of the vertical dimension
89.2 FM Fracture Multiple from 10 o'clock to 4 o'clock, within 8 inch S4 106.3 FS Fracture Spiral from 2 o'clock to 4 o'clock, within 8 inch S3 110.9 MWL Water Level, 40% of the vertical dimension
126.5 FS Fracture Spiral from 1 o'clock to 4 o'clock, within 8 inch S3 137.4 FM Fracture Multiple from 10 o'clock to 4 o'clock, within 8 inch S4 137.4 MWL Water Level, 30% of the vertical dimension
147.5 FS Fracture Spiral from 10 o'clock to 12 o'clock, within 8 inch S3 167.9 FM Fracture Multiple from 11 o'clock to 2 o'clock, within 8 inch S4 12/6/2023 Grant Light U-0417-07007899 7020 - 7018
No Pre-Cleaning Downstream 678.20 ' 678.20 '
7020
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 129
1:1525 Distance Code Observation Grade
172.8 B Broken from 10 o'clock to 4 o'clock, within 8 inch S4 182.9 S01 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start
182.9 S02 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Start
194.8 FM Fracture Multiple from 11 o'clock to 4 o'clock, within 8 inch S4 201.0 MWL Water Level, 30% of the vertical dimension
204.5 FS Fracture Spiral from 10 o'clock to 2 o'clock, within 8 inch S3 210.1 FM Fracture Multiple from 9 o'clock to 3 o'clock S4 215.8 FM Fracture Multiple from 10 o'clock to 4 o'clock, within 8 inch S4 230.6 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4 236.7 FS Fracture Spiral from 2 o'clock to 4 o'clock, within 8 inch S3 247.1 FM Fracture Multiple from 10 o'clock to 4 o'clock, within 8 inch S4 273.1 FS Fracture Spiral from 10 o'clock to 12 o'clock, within 8 inch S3 283.7 FL Fracture Longitudinal at 12 o'clock, within 8 inch S3 290.0 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 305.1 FS Fracture Spiral from 12 o'clock to 1 o'clock, within 8 inch S3 309.1 FS Fracture Spiral from 1 o'clock to 4 o'clock, within 8 inch S3 319.8 FM Fracture Multiple from 10 o'clock to 3 o'clock S4 367.5 FS Fracture Spiral from 10 o'clock to 12 o'clock, within 8 inch S3 12/6/2023 Grant Light U-0417-07007899 7020 - 7018
No Pre-Cleaning Downstream 678.20 ' 678.20 '
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 130
1:1525 Distance Code Observation Grade
392.9 FM Fracture Multiple from 7 o'clock to 12 o'clock, within 8 inch S4 392.9 F01 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish
M2
392.9 F02 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Finish
M2
421.9 MWL Water Level, 20% of the vertical dimension
426.3 FM Fracture Multiple from 10 o'clock to 2 o'clock, within 8 inch S4 461.8 FM Fracture Multiple from 10 o'clock to 4 o'clock, within 8 inch S4 466.4 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 477.8 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4 503.7 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4 524.6 FM Fracture Multiple from 9 o'clock to 1 o'clock, within 8 inch S4 540.5 FS Fracture Spiral from 12 o'clock to 4 o'clock, within 8 inch S3 545.0 FM Fracture Multiple from 11 o'clock to 3 o'clock, within 8 inch S4 576.1 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 587.3 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 598.5 FM Fracture Multiple from 10 o'clock to 1 o'clock, within 8 inch S4 619.1 FM Fracture Multiple from 10 o'clock to 3 o'clock S4 639.6 B Broken from 1 o'clock to 4 o'clock, within 8 inch S4 650.5 FM Fracture Multiple from 11 o'clock to 2 o'clock, within 8 inch S4 666.5 FM Fracture Multiple from 8 o'clock to 1 o'clock, within 8 inch S4 670.5 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 12/6/2023 Grant Light U-0417-07007899 7020 - 7018
No Pre-Cleaning Downstream 678.20 ' 678.20 '
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 131
1:1525 Distance Code Observation Grade
678.2 AMH Manhole / 7018
12/6/2023 Grant Light U-0417-07007899 7020 - 7018
No Pre-Cleaning Downstream 678.20 ' 678.20 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4D3A 2O00 155.0 168.0 323.0 3.7 2.0 2.6
7018
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 146
City: McFarland Drainage Area: Upstream MH: 7022
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7020
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:1857 Distance Code Observation Grade
0.0 AMH Manhole / 7022
0.0 MWL Water Level, 45% of the vertical dimension
4.0 FS Fracture Spiral from 12 o'clock to 1 o'clock, within 8 inch S3
8.5 MWL Water Level, 50% of the vertical dimension
13.3 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4
24.3 FM Fracture Multiple from 10 o'clock to 2 o'clock, within 8 inch S4
28.8 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4
38.9 FM Fracture Multiple from 1 o'clock to 4 o'clock, within 8 inch S4
44.1 FM Fracture Multiple from 9 o'clock to 12 o'clock, within 8 inch S4
50.6 FM Fracture Multiple from 1 o'clock to 4 o'clock, within 8 inch S4
55.5 FS Fracture Spiral from 12 o'clock to 4 o'clock, within 8 inch S3
71.2 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4
76.4 FL Fracture Longitudinal at 12 o'clock, within 8 inch S3
82.3 FS Fracture Spiral from 11 o'clock to 2 o'clock, within 8 inch S3
90.8 MWL Water Level, 40% of the vertical dimension
97.7 FM Fracture Multiple from 10 o'clock to 2 o'clock, within 8 inch S4 12/6/2023 Grant Light U-0417-07007899 7022 - 7020
No Pre-Cleaning Downstream 674.90 ' 674.90 '
7022
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 147
1:1857 Distance Code Observation Grade
102.0 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 119.1 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 127.5 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 133.3 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 138.6 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 143.8 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 148.5 MWL Water Level, 35% of the vertical dimension
148.5 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 190.8 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 196.5 B Broken from 10 o'clock to 4 o'clock, within 8 inch S4 205.3 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 205.3 MWL Water Level, 40% of the vertical dimension
216.9 FS Fracture Spiral from 1 o'clock to 5 o'clock, within 8 inch S3 238.1 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 248.8 FL Fracture Longitudinal at 1 o'clock, within 8 inch S3 285.3 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 288.7 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 294.6 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 311.3 FM Fracture Multiple from 9 o'clock to 4 o'clock, within 8 inch S4 311.3 MWL Water Level, 30% of the vertical dimension
12/6/2023 Grant Light U-0417-07007899 7022 - 7020
No Pre-Cleaning Downstream 674.90 ' 674.90 '
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 148
1:1857 Distance Code Observation Grade
321.9 FM Fracture Multiple from 12 o'clock to 4 o'clock, within 8 inch S4 331.9 FM Fracture Multiple from 12 o'clock to 2 o'clock, within 8 inch S4 358.1 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 358.1 MWL Water Level, 40% of the vertical dimension
363.5 S01 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch, Start
479.7 MWL Water Level, 45% of the vertical dimension
536.0 F01 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch, Finish
S4
547.0 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 556.4 FM Fracture Multiple from 10 o'clock to 4 o'clock, within 8 inch S4 561.1 S02 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch, Start
577.9 F02 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch, Finish
S4
583.3 FS Fracture Spiral from 8 o'clock to 4 o'clock, within 8 inch S3 587.1 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 601.8 MWL Water Level, 40% of the vertical dimension
604.5 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 614.0 FM Fracture Multiple from 9 o'clock to 4 o'clock, within 8 inch S4 618.9 FM Fracture Multiple from 9 o'clock to 4 o'clock, within 8 inch S4 639.7 FM Fracture Multiple from 12 o'clock to 3 o'clock, within 8 inch S4 671.4 FL Fracture Longitudinal at 12 o'clock, within 8 inch S3 674.9 AMH Manhole / 7020
12/6/2023 Grant Light U-0417-07007899 7022 - 7020
No Pre-Cleaning Downstream 674.90 ' 674.90 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4M38 0000 304.0 0.0 304.0 3.9 0.0 3.9
7020
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 163
City: McFarland Drainage Area: Upstream MH: 7024
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7022
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:2447 Distance Code Observation Grade
0.0 AMH Manhole / 7024
0.0 MWL Water Level, 25% of the vertical dimension
4.4 S01 MWLS Miscellaneous Water Level, Sag, 40% of the vertical dimension, Start
6.6 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4
17.0 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4
27.5 FM Fracture Multiple from 1 o'clock to 5 o'clock, within 8 inch S4
32.7 S02 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch, Start / Wandering
54.1 F02 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch, Finish / Wandering
S4
70.8 FM Fracture Multiple from 1 o'clock to 4 o'clock, within 8 inch S4
73.0 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4
85.2 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4
94.6 F01 MWLS Miscellaneous Water Level, Sag, 40% of the vertical dimension, Finish
S3
96.0 FM Fracture Multiple from 10 o'clock to 2 o'clock, within 8 inch S4 106.5 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4 116.1 FM Fracture Multiple from 9 o'clock to 4 o'clock, within 8 inch S4 122.4 FS Fracture Spiral from 2 o'clock to 4 o'clock, within 8 inch S3 12/6/2023 Grant Light U-0417-07007899 7024 - 7022
No Pre-Cleaning Downstream 677.20 ' 677.20 '
7024
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 164
1:2447 Distance Code Observation Grade
127.4 S03 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch, Start
202.9 MWL Water Level, 20% of the vertical dimension
249.9 S04 MWLS Miscellaneous Water Level, Sag, 45% of the vertical dimension, Start
316.5 F03 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch, Finish
S4
320.7 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 337.7 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 343.1 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 380.0 FM Fracture Multiple from 12 o'clock to 3 o'clock, within 8 inch S4 384.6 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 390.1 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4 394.8 S05 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch, Start / Wandeing
405.5 F04 MWLS Miscellaneous Water Level, Sag, 45% of the vertical dimension, Finish
S3
432.6 B Broken from 8 o'clock to 4 o'clock, within 8 inch S4 471.6 S06 MWLS Miscellaneous Water Level, Sag, 45% of the vertical dimension, Start
536.2 F05 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch, Finish / Wandeing
S4
557.5 FL Fracture Longitudinal at 8 o'clock, within 8 inch S3 566.7 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 583.5 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 588.6 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 594.4 FM Fracture Multiple from 8 o'clock to 11 o'clock, within 8 inch S4 12/6/2023 Grant Light U-0417-07007899 7024 - 7022
No Pre-Cleaning Downstream 677.20 ' 677.20 '
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 165
1:2447 Distance Code Observation Grade
599.6 FL Fracture Longitudinal at 2 o'clock, within 8 inch S3 603.8 FM Fracture Multiple from 8 o'clock to 3 o'clock, within 8 inch S4 608.7 FS Fracture Spiral from 2 o'clock to 5 o'clock, within 8 inch S3 625.2 FM Fracture Multiple from 2 o'clock to 4 o'clock, within 8 inch S4 639.3 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 650.8 FM Fracture Multiple from 8 o'clock to 3 o'clock, within 8 inch S4 656.1 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 673.7 F06 MWLS Miscellaneous Water Level, Sag, 45% of the vertical dimension, Finish
S3
677.2 AMH Manhole / 7022
12/6/2023 Grant Light U-0417-07007899 7024 - 7022
No Pre-Cleaning Downstream 677.20 ' 677.20 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4R3Q 0000 659.0 0.0 659.0 3.5 0.0 3.5
7022
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 178
City: McFarland Drainage Area: Upstream MH: 7026
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7024
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:1913 Distance Code Observation Grade
0.0 AMH Manhole / 7026
0.0 MWL Water Level, 15% of the vertical dimension
4.0 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 5 o'clock, within 8 inch
M2
8.5 S01 DAGS Deposits Attached Grease, 10% of cross sectional area from 7 o'clock to 9 o'clock, within 8 inch, Start
11.7 S02 DAGS Deposits Attached Grease, 10% of cross sectional area from 3 o'clock to 5 o'clock, within 8 inch, Start
77.9 B Broken from 9 o'clock to 3 o'clock, within 8 inch S4
88.8 B Broken from 9 o'clock to 3 o'clock, within 8 inch S4
99.7 FS Fracture Spiral from 12 o'clock to 5 o'clock, within 8 inch S3 132.3 F01 DAGS Deposits Attached Grease, 10% of cross sectional area from 7 o'clock to 9 o'clock, within 8 inch, Finish
M2
132.3 F02 DAGS Deposits Attached Grease, 10% of cross sectional area from 3 o'clock to 5 o'clock, within 8 inch, Finish
M2
141.6 FM Fracture Multiple from 11 o'clock to 5 o'clock, within 8 inch S4 185.6 S03 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Start
185.6 S04 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start
193.1 S05 MWLS Miscellaneous Water Level, Sag, 25% of the vertical dimension, Start
225.0 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4 249.6 DAR Deposits Attached Ragging, 15% of cross sectional area from 4 o'clock to 8 o'clock
M3
12/6/2023 Grant Light U-0417-07007899 7026 - 7024
No Pre-Cleaning Downstream 680.00 ' 680.00 '
7026
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 179
1:1913 Distance Code Observation Grade
257.3 F03 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Finish
M2
257.3 F04 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish
M2
257.3 F05 MWLS Miscellaneous Water Level, Sag, 25% of the vertical dimension, Finish
S2
286.0 S06 MWLS Miscellaneous Water Level, Sag, 30% of the vertical dimension, Start
292.3 S07 DAGS Deposits Attached Grease, 10% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start
292.3 S08 DAGS Deposits Attached Grease, 10% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Start
292.3 FM Fracture Multiple from 10 o'clock to 2 o'clock, within 8 inch S4 314.2 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4 319.8 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4 331.3 F06 MWLS Miscellaneous Water Level, Sag, 30% of the vertical dimension, Finish
S2
331.3 F07 DAGS Deposits Attached Grease, 10% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish
M2
353.2 DAGS Deposits Attached Grease, 5% of cross sectional area from 4 o'clock to 5 o'clock, within 8 inch
M2
366.3 S09 DAGS Deposits Attached Grease, 10% of cross sectional area from 3 o'clock to 5 o'clock, within 8 inch, Start
383.9 S10 MWLS Miscellaneous Water Level, Sag, 35% of the vertical dimension, Start
414.6 FC Fracture Circumferential from 9 o'clock to 1 o'clock, within 8 inch
S2
419.1 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 434.6 F10 MWLS Miscellaneous Water Level, Sag, 35% of the vertical dimension, Finish
S3
450.7 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 455.8 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 466.2 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4 12/6/2023 Grant Light U-0417-07007899 7026 - 7024
No Pre-Cleaning Downstream 680.00 ' 680.00 '
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 180
1:1913 Distance Code Observation Grade
493.5 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 503.5 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4 529.4 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 544.4 S11 MWLS Miscellaneous Water Level, Sag, 25% of the vertical dimension, Start
603.5 FL Fracture Longitudinal at 12 o'clock, within 8 inch S3 614.5 F11 MWLS Miscellaneous Water Level, Sag, 25% of the vertical dimension, Finish
S2
619.0 FM Fracture Multiple from 1 o'clock to 4 o'clock, within 8 inch S4 634.9 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 640.3 FS Fracture Spiral from 12 o'clock to 2 o'clock, within 8 inch S3 666.3 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 680.0 F08 DAGS Deposits Attached Grease, 10% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Finish
M2
680.0 F09 DAGS Deposits Attached Grease, 10% of cross sectional area from 3 o'clock to 5 o'clock, within 8 inch, Finish
M2
680.0 AMH Manhole / 7024
12/6/2023 Grant Light U-0417-07007899 7026 - 7024
No Pre-Cleaning Downstream 680.00 ' 680.00 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4B3A 312Z 181.0 459.0 640.0 2.7 2.0 2.2
7024
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 194
City: McFarland Drainage Area: Upstream MH: 7028
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7026
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:2370 Distance Code Observation Grade
0.0 AMH Manhole / 7028
0.0 MWL Water Level, 10% of the vertical dimension
21.8 S01 DAGS Deposits Attached Grease, 10% of cross sectional area from 3 o'clock to 5 o'clock, within 8 inch, Start
21.8 S02 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Start
50.6 F01 DAGS Deposits Attached Grease, 10% of cross sectional area from 3 o'clock to 5 o'clock, within 8 inch, Finish
M2
50.6 F02 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Finish
M2
59.6 S03 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Start
59.6 S04 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start
123.6 F03 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Finish
M2
123.6 F04 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish
M2
133.9 S05 DAGS Deposits Attached Grease, 10% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Start
133.9 S06 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start
148.7 FM Fracture Multiple from 12 o'clock to 4 o'clock, within 8 inch S4 159.7 FS Fracture Spiral from 2 o'clock to 4 o'clock, within 8 inch S3 185.8 F06 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish
M2
201.1 S07 DAGS Deposits Attached Grease, 15% of cross sectional area from 3 o'clock to 5 o'clock, within 8 inch, Start
12/6/2023 Grant Light U-0417-07007899 7028 - 7026
No Pre-Cleaning Downstream 678.30 ' 678.30 '
7028
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 195
1:2370 Distance Code Observation Grade
240.7 MWL Water Level, 15% of the vertical dimension
278.7 DAR Deposits Attached Ragging, 5% of cross sectional area from 4 o'clock to 5 o'clock, within 8 inch
M2
285.4 FM Fracture Multiple from 7 o'clock to 11 o'clock, within 8 inch S4 285.4 FM Fracture Multiple from 3 o'clock to 5 o'clock, within 8 inch S4 300.9 FS Fracture Spiral from 10 o'clock to 11 o'clock, within 8 inch S3 362.7 MWL Water Level, 20% of the vertical dimension
457.5 FM Fracture Multiple from 9 o'clock to 2 o'clock, within 8 inch S4 457.5 F05 DAGS Deposits Attached Grease, 10% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Finish
M2
457.5 F07 DAGS Deposits Attached Grease, 15% of cross sectional area from 3 o'clock to 5 o'clock, within 8 inch, Finish
M3
468.2 CM Crack Multiple from 11 o'clock to 1 o'clock, within 8 inch S3 481.1 S08 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Start
481.1 S09 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start
484.4 FM Fracture Multiple from 2 o'clock to 5 o'clock, within 8 inch S4 561.0 OBZ Obstruction Other, 10% of cross sectional area from 5 o'clock to 7 o'clock / Unknown
M2
600.1 MWL Water Level, 30% of the vertical dimension
648.3 OBZ Obstruction Other, 25% of cross sectional area from 4 o'clock to 8 o'clock, within 8 inch / Unknown
M4
678.3 F08 DAGS Deposits Attached Grease, 10% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Finish
M2
678.3 F09 DAGS Deposits Attached Grease, 10% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish
M2
678.3 AMH Manhole / 7026
12/6/2023 Grant Light U-0417-07007899 7028 - 7026
No Pre-Cleaning Downstream 678.30 ' 678.30 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4533 413I 29.0 543.0 572.0 3.6 2.2 2.3
7026
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 205
City: McFarland Drainage Area: Upstream MH: 7030
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7028
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:2861 Distance Code Observation Grade
0.0 AMH Manhole / 7030
0.0 MWL Water Level, 15% of the vertical dimension
8.8 B Broken from 8 o'clock to 4 o'clock, within 8 inch S4
21.1 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4
29.5 FM Fracture Multiple from 8 o'clock to 10 o'clock, within 8 inch S4
34.0 FS Fracture Spiral from 1 o'clock to 4 o'clock, within 8 inch S3
42.8 FM Fracture Multiple from 9 o'clock to 2 o'clock, within 8 inch S4
46.8 FM Fracture Multiple from 10 o'clock to 2 o'clock, within 8 inch S4
50.2 VC Vermin Cockroach, within 8 inch M1
50.8 FS Fracture Spiral from 9 o'clock to 11 o'clock, within 8 inch S3
54.6 B Broken from 11 o'clock to 5 o'clock, within 8 inch S4
58.8 FM Fracture Multiple from 7 o'clock to 10 o'clock, within 8 inch S4
70.6 FM Fracture Multiple from 10 o'clock to 4 o'clock, within 8 inch S4
83.9 FM Fracture Multiple from 9 o'clock to 4 o'clock, within 8 inch S4
87.6 FM Fracture Multiple from 9 o'clock to 12 o'clock, within 8 inch S4
91.9 FS Fracture Spiral from 2 o'clock to 4 o'clock, within 8 inch S3 12/6/2023 Grant Light U-0417-07007899 7030 - 7028
No Pre-Cleaning Downstream 676.40 ' 676.40 '
7030
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 206
1:2861 Distance Code Observation Grade
156.8 FM Fracture Multiple from 10 o'clock to 1 o'clock, within 8 inch S4 174.2 S01 DAGS Deposits Attached Grease, 5% of cross sectional area from 7 o'clock to 9 o'clock, within 8 inch, Start
183.4 FM Fracture Multiple from 9 o'clock to 3 o'clock, within 8 inch S4 183.4 F01 DAGS Deposits Attached Grease, 5% of cross sectional area from 7 o'clock to 9 o'clock, within 8 inch, Finish
M2
215.2 S02 DAGS Deposits Attached Grease, 5% of cross sectional area from 7 o'clock to 9 o'clock, within 8 inch, Start
225.5 F02 DAGS Deposits Attached Grease, 5% of cross sectional area from 7 o'clock to 9 o'clock, within 8 inch, Finish
M2
236.3 FM Fracture Multiple from 8 o'clock to 1 o'clock, within 8 inch S4 266.7 DAGS Deposits Attached Grease, 5% of cross sectional area from 7 o'clock to 8 o'clock, within 8 inch
M2
290.7 S03 DAGS Deposits Attached Grease, 5% of cross sectional area from 7 o'clock to 9 o'clock, within 8 inch, Start / Wandering 290.7 S04 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 5 o'clock, within 8 inch, Start / Wandering 486.7 FM Fracture Multiple from 1 o'clock to 4 o'clock, within 8 inch S4 638.6 F03 DAGS Deposits Attached Grease, 5% of cross sectional area from 7 o'clock to 9 o'clock, within 8 inch, Finish / Wandering M2
638.6 F04 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 5 o'clock, within 8 inch, Finish / Wandering M2
647.9 S05 DAGS Deposits Attached Grease, 10% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start
647.9 S06 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Start
658.9 F05 DAGS Deposits Attached Grease, 10% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish
M2
658.9 F06 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Finish
M2
676.4 AMH Manhole / 7028
12/6/2023 Grant Light U-0417-07007899 7030 - 7028
No Pre-Cleaning Downstream 676.40 ' 676.40 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4A33 2Z11 65.0 299.0 364.0 3.8 2.0 2.2
7028
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 216
City: McFarland Drainage Area: Upstream MH: 7032
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7030
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:2335 Distance Code Observation Grade
0.0 AMH Manhole / 7032
0.0 MWL Water Level, 20% of the vertical dimension
14.2 S01 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start
14.2 S02 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Start
37.6 MWL Water Level, 25% of the vertical dimension
57.3 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4
78.1 MWL Water Level, 20% of the vertical dimension
171.6 B Broken from 8 o'clock to 4 o'clock, within 8 inch S4 219.1 MWL Water Level, 25% of the vertical dimension
236.9 MWL Water Level, 40% of the vertical dimension
242.7 MWL Water Level, 35% of the vertical dimension
291.4 F01 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish
M2
291.4 F02 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Finish
M2
291.4 MWL Water Level, 20% of the vertical dimension
300.1 B Broken from 8 o'clock to 4 o'clock S4
304.7 FM Fracture Multiple from 10 o'clock to 1 o'clock, within 8 inch S4 12/6/2023 Grant Light U-0417-07007899 7032 - 7030
No Pre-Cleaning Downstream 671.40 ' 671.40 '
7032
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 217
1:2335 Distance Code Observation Grade
314.0 FS Fracture Spiral from 9 o'clock to 12 o'clock, within 8 inch S3 317.5 FS Fracture Spiral from 10 o'clock to 12 o'clock, within 8 inch S3 318.7 MWL Water Level, 20% of the vertical dimension
326.7 FS Fracture Spiral from 12 o'clock to 1 o'clock, within 8 inch S3 334.0 B Broken from 12 o'clock to 2 o'clock, within 8 inch S4 338.3 FM Fracture Multiple from 10 o'clock to 11 o'clock, within 8 inch S4 338.3 FL Fracture Longitudinal at 4 o'clock, within 8 inch S3 341.0 B Broken from 1 o'clock to 4 o'clock, within 8 inch S4 346.4 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 346.4 MWL Water Level, 15% of the vertical dimension
351.0 FL Fracture Longitudinal at 12 o'clock, within 8 inch, length:
2inch
S3
356.4 MWL Water Level, 10% of the vertical dimension
358.8 FS Fracture Spiral from 2 o'clock to 4 o'clock, within 8 inch S3 363.6 FL Fracture Longitudinal at 10 o'clock, within 8 inch S3 375.6 FL Fracture Longitudinal at 8 o'clock, within 8 inch S3 375.9 VC Vermin Cockroach, within 8 inch M1
375.9 CL Crack Longitudinal at 1 o'clock, within 8 inch S2 380.2 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 417.9 FM Fracture Multiple from 12 o'clock to 3 o'clock, within 8 inch S4 430.1 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 12/6/2023 Grant Light U-0417-07007899 7032 - 7030
No Pre-Cleaning Downstream 671.40 ' 671.40 '
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 218
1:2335 Distance Code Observation Grade
434.3 S03 FM Fracture Multiple from 7 o'clock to 5 o'clock, within 8 inch, Start / Wandering
458.9 F03 FM Fracture Multiple from 7 o'clock to 5 o'clock, within 8 inch, Finish / Wandering
S4
467.1 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 491.5 B Broken from 12 o'clock to 3 o'clock, within 8 inch S4 500.1 FM Fracture Multiple from 11 o'clock to 2 o'clock, within 8 inch S4 500.1 FM Fracture Multiple from 11 o'clock to 3 o'clock S4 520.3 FM Fracture Multiple from 9 o'clock to 4 o'clock, within 8 inch S4 587.3 FS Fracture Spiral from 2 o'clock to 5 o'clock, within 8 inch S3 591.4 FS Fracture Spiral from 12 o'clock to 4 o'clock, within 8 inch S3 602.3 S04 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start
608.3 DAGS Deposits Attached Grease, 5% of cross sectional area at 8 o'clock, within 8 inch
M2
616.4 S05 MWLS Miscellaneous Water Level, Sag, 30% of the vertical dimension, Start
616.4 F04 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish
M2
632.2 FM Fracture Multiple from 9 o'clock to 4 o'clock, within 8 inch S4 653.9 FM Fracture Multiple from 9 o'clock to 4 o'clock, within 8 inch S4 665.6 B Broken from 10 o'clock to 3 o'clock, within 8 inch S4 668.5 F05 MWLS Miscellaneous Water Level, Sag, 30% of the vertical dimension, Finish
S2
671.4 AMH Manhole / 7030
12/6/2023 Grant Light U-0417-07007899 7032 - 7030
No Pre-Cleaning Downstream 671.40 ' 671.40 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4C3A 2U11 148.0 229.0 377.0 3.3 2.0 2.4
7030
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 233
City: McFarland Drainage Area: Upstream MH: 7034
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7032
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:2577 Distance Code Observation Grade
0.0 AMH Manhole / 7034
0.0 MWL Water Level, 15% of the vertical dimension
17.0 MWL Water Level, 20% of the vertical dimension
23.6 S01 DAGS Deposits Attached Grease, 5% of cross sectional area from 7 o'clock to 8 o'clock, within 8 inch, Start
26.8 S02 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start
38.5 F01 DAGS Deposits Attached Grease, 5% of cross sectional area from 7 o'clock to 8 o'clock, within 8 inch, Finish
M2
38.5 F02 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish
M2
38.5 MWL Water Level, 10% of the vertical dimension
55.6 MWL Water Level, 15% of the vertical dimension
108.1 S03 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start
108.1 S04 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Start
117.4 MWL Water Level, 20% of the vertical dimension
137.0 B Broken from 12 o'clock to 4 o'clock, within 8 inch S4 162.8 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 168.6 CC Crack Circumferential from 7 o'clock to 9 o'clock, within 8 inch
S1
12/5/2023 Grant Light U-0417-07007899 7034 - 7032
No Pre-Cleaning Downstream 674.00 ' 674.00 '
7034
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 234
1:2577 Distance Code Observation Grade
184.8 F03 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish
M2
184.8 F04 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Finish
M2
190.1 MWL Water Level, 15% of the vertical dimension
209.2 FL Fracture Longitudinal at 2 o'clock, within 8 inch S3 225.5 DAGS Deposits Attached Grease, 5% of cross sectional area at 4 o'clock, within 8 inch
M2
242.5 MWL Water Level, 20% of the vertical dimension
292.4 S05 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Start
292.4 S06 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start
385.6 MWL Water Level, 30% of the vertical dimension
452.9 MWL Water Level, 25% of the vertical dimension
522.1 MWL Water Level, 30% of the vertical dimension
547.8 MWL Water Level, 25% of the vertical dimension
661.7 MWL Water Level, 20% of the vertical dimension
674.0 F05 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Finish
M2
674.0 F06 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish
M2
674.0 AMH Manhole / 7032
12/5/2023 Grant Light U-0417-07007899 7034 - 7032
No Pre-Cleaning Downstream 674.00 ' 674.00 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4231 2Z00 12.0 376.0 388.0 3.0 2.0 2.0
7032
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 243
City: McFarland Drainage Area: Upstream MH: 7035
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7034
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:4511 Distance Code Observation Grade
0.0 AMH Manhole / 7035
0.0 MWL Water Level, 35% of the vertical dimension
6.9 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4
18.4 MWL Water Level, 40% of the vertical dimension
63.4 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch
M2
104.0 MWL Water Level, 35% of the vertical dimension
119.5 MGO Miscellaneous General Observation / Buried UDMH 133.5 MWL Water Level, 40% of the vertical dimension
184.4 MWL Water Level, 45% of the vertical dimension
261.7 MWL Water Level, 40% of the vertical dimension
323.4 DAGS Deposits Attached Grease, 5% of cross sectional area at 9 o'clock, within 8 inch
M2
456.3 MWL Water Level, 40% of the vertical dimension
509.3 S01 DAGS Deposits Attached Grease, 5% of cross sectional area at 9 o'clock, within 8 inch, Start
509.3 S02 DAGS Deposits Attached Grease, 5% of cross sectional area at 3 o'clock, Start
520.1 F01 DAGS Deposits Attached Grease, 5% of cross sectional area at 9 o'clock, within 8 inch, Finish
M2
520.1 F02 DAGS Deposits Attached Grease, 5% of cross sectional area at 3 o'clock, Finish
M2
12/5/2023 Grant Light U-0417-07007899 7035 - 7034
No Pre-Cleaning Downstream 675.20 ' 675.20 '
7035
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Pipe Segment Ref.: Weather: Surveyed By: Certificate Number:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 244
1:4511 Distance Code Observation Grade
675.2 AMH Manhole / 7034
12/5/2023 Grant Light U-0417-07007899 7035 - 7034
No Pre-Cleaning Downstream 675.20 ' 675.20 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4100 2600 4.0 12.0 16.0 4.0 2.0 2.3
7034
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Pipe Segment Ref.: Weather: Surveyed By: Certificate Number:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 250
City: McFarland Drainage Area: Upstream MH: 7037
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7035
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:247 Distance Code Observation Grade
0.0 AMH Manhole / 7037
0.0 MWL Water Level, 30% of the vertical dimension
8.5 MWL Water Level, 40% of the vertical dimension
32.6 AMH Manhole / 7035
12/5/2023 Grant Light U-0417-07007899 7037 - 7035
No Pre-Cleaning Downstream 32.60 ' 32.60 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0.0 0.0 0.0 0.0 0.0 0.0
7037
7035
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 252
City: McFarland Drainage Area: Upstream MH: 7038
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7037
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:2287 Distance Code Observation Grade
0.0 AMH Manhole / 7038
0.0 MWL Water Level, 10% of the vertical dimension
227.9 MWL Water Level, 20% of the vertical dimension
268.2 MWL Water Level, 40% of the vertical dimension
302.9 OBZ Obstruction Other, 25% of cross sectional area from 3 o'clock to 9 o'clock / Object blocking flow
M4
302.9 AMH Manhole / 7037
12/5/2023 Grant Light U-0417-07007899 7038 - 7037
No Pre-Cleaning Downstream 302.90 ' 302.90 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 4100 0.0 4.0 4.0 0.0 4.0 4.0
7038
7037
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 255
City: McFarland Drainage Area: Upstream MH: 7039
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7038
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:327 Distance Code Observation Grade
0.0 AMH Manhole / 7039
0.0 MWL Water Level, 10% of the vertical dimension
37.6 FS Fracture Spiral from 4 o'clock to 5 o'clock, within 8 inch S3
43.3 AMH Manhole / 7038
12/5/2023 Grant Light U-0417-07007899 7039 - 7038
No Pre-Cleaning Downstream 43.30 ' 43.30 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
3100 0000 3.0 0.0 3.0 3.0 0.0 3.0
7039
7038
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 257
City: McFarland Drainage Area: Upstream MH: 7040
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7039
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:1244 Distance Code Observation Grade
0.0 AMH Manhole / 7040
0.0 MWL Water Level, 10% of the vertical dimension
164.7 AMH Manhole / 7039
12/5/2023 Grant Light U-0417-07007899 7040 - 7039
No Pre-Cleaning Downstream 164.70 ' 164.70 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0.0 0.0 0.0 0.0 0.0 0.0
7040
7039
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 309
City: McFarland Drainage Area: Upstream MH: 7100
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7040
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:982 Distance Code Observation Grade
0.0 AMH Manhole / 7100
0.0 MWL Water Level, 10% of the vertical dimension
3.9 SSS Surface Damage Spalling from 9 o'clock to 11 o'clock S2
4.4 VC Vermin Cockroach, within 8 inch M1
130.0 AMH Manhole / 7040
12/5/2023 Grant Light U-0417-07007899 7100 - 7040
No Pre-Cleaning Downstream 130.00 ' 130.00 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
2100 1100 2.0 1.0 3.0 2.0 1.0 1.5
7100
7040
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 259
City: McFarland Drainage Area: Upstream MH: 7041
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7100
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:1498 Distance Code Observation Grade
0.0 AMH Manhole / 7041
0.0 MWL Water Level, 10% of the vertical dimension
0.0 RPR Point Repair Replacement, within 8 inch / PVC
3.3 BSV Broken Soil Visible from 8 o'clock to 11 o'clock, within 8 inch
S5
4.2 MGP Miscellaneous General Photograph from 7 o'clock to 11 o'clock / BSV
198.4 AMH Manhole / 7100
12/5/2023 Grant Light U-0417-07007899 7041 - 7100
No Pre-Cleaning Downstream 198.40 ' 198.40 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
5100 0000 5.0 0.0 5.0 5.0 0.0 5.0
7041
7100
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 262
City: McFarland Drainage Area: Upstream MH: 7042
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7041
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:1056 Distance Code Observation Grade
0.0 AMH Manhole / 7042
0.0 MWL Water Level, 10% of the vertical dimension
3.3 SSS Surface Damage Spalling from 9 o'clock to 1 o'clock S2 139.8 AMH Manhole / 7041
12/5/2023 Grant Light U-0417-07007899 7042 - 7041
No Pre-Cleaning Downstream 139.80 ' 139.80 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
2100 0000 2.0 0.0 2.0 2.0 0.0 2.0
7042
7041
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 264
City: McFarland Drainage Area: Upstream MH: 7043
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7042
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:1416 Distance Code Observation Grade
0.0 AMH Manhole / 7043
0.0 MWL Water Level, 10% of the vertical dimension
187.6 AMH Manhole / 7042
12/5/2023 Grant Light U-0417-07007899 7043 - 7042
No Pre-Cleaning Downstream 187.60 ' 187.60 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0.0 0.0 0.0 0.0 0.0 0.0
7043
7042
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Pipe Segment Ref.: Weather: Surveyed By: Certificate Number:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 266
City: McFarland Drainage Area: Upstream MH: 7045
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7043
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:1249 Distance Code Observation Grade
0.0 AMH Manhole / 7045
0.0 MWL Water Level, 10% of the vertical dimension
12.0 MGP Miscellaneous General Photograph at 12 o'clock / MH 7044 111.4 FM Fracture Multiple from 1 o'clock to 5 o'clock, within 8 inch S4 120.0 FM Fracture Multiple from 7 o'clock to 5 o'clock, within 8 inch S4 136.5 FL Fracture Longitudinal at 4 o'clock, within 8 inch S3 165.4 AMH Manhole / 7043
12/5/2023 Grant Light U-0417-07007899 7045 - 7043
No Pre-Cleaning Downstream 165.40 ' 165.40 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4231 0000 11.0 0.0 11.0 3.7 0.0 3.7
7045
7043
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 269
City: McFarland Drainage Area: Upstream MH: 7046
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7045
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:1155 Distance Code Observation Grade
0.0 AMH Manhole / 7046
0.0 MWL Water Level, 10% of the vertical dimension
153.0 AMH Manhole / 7045
12/5/2023 Grant Light U-0417-07007899 7046 - 7045
No Pre-Cleaning Downstream 153.00 ' 153.00 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0.0 0.0 0.0 0.0 0.0 0.0
7046
7045
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 271
City: McFarland Drainage Area: Upstream MH: 7048
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7046
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:1271 Distance Code Observation Grade
0.0 AMH Manhole / 7048
0.0 MWL Water Level, 10% of the vertical dimension
4.8 VC Vermin Cockroach, within 8 inch M1
168.4 AMH Manhole / 7046
12/5/2023 Grant Light U-0417-07007899 7047 - 7046
No Pre-Cleaning Downstream 168.40 ' 168.40 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 1100 0.0 1.0 1.0 0.0 1.0 1.0
7048
7046
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 273
City: McFarland Drainage Area: Upstream MH: 7048
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7047
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:1325 Distance Code Observation Grade
0.0 AMH Manhole / 7048
0.0 MWL Water Level, 15% of the vertical dimension
0.0 DAR Deposits Attached Ragging, 10% of cross sectional area from 6 o'clock to 8 o'clock, within 8 inch
M2
175.5 AMH Manhole / 7047
12/5/2023 Grant Light U-0417-07007899 7048 - 7047
No Pre-Cleaning Downstream 175.50 ' 175.50 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 2100 0.0 2.0 2.0 0.0 2.0 2.0
7048
7047
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 275
City: McFarland Drainage Area: Upstream MH: 7049
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7048
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 18 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: None Owner:
Additional Info:
1:1941 Distance Code Observation Grade
0.0 AMH Manhole / 7049
0.0 MWL Water Level, 15% of the vertical dimension
4.0 MWL Water Level, 20% of the vertical dimension
19.4 VC Vermin Cockroach, within 8 inch M1
93.1 MWL Water Level, 30% of the vertical dimension
160.7 MWL Water Level, 25% of the vertical dimension
234.9 S01 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Start / wandering 234.9 S02 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Start / wandering 250.2 F01 DAGS Deposits Attached Grease, 5% of cross sectional area from 3 o'clock to 4 o'clock, within 8 inch, Finish / wandering M2
250.2 F02 DAGS Deposits Attached Grease, 5% of cross sectional area from 8 o'clock to 9 o'clock, within 8 inch, Finish / wandering M2
257.1 AMH Manhole / 7048
12/5/2023 Grant Light U-0417-07007899 7049 -7048
No Pre-Cleaning Downstream 257.10 ' 257.10 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 2611 0.0 13.0 13.0 0.0 1.9 1.9
7049
7048
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 6
City: McFarland Drainage Area: Upstream MH: 7002
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: Headworks
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 24 " Sewer Category: SEC Joints passed: 0
Pipe material: Polyvinyl Chloride Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:2191 Distance Code Observation Grade
0.0 AMH Manhole / 7002
0.0 MWL Water Level, 10% of the vertical dimension
19.4 S01 MWLS Miscellaneous Water Level, Sag, 20% of the vertical dimension, Start
34.7 F01 MWLS Miscellaneous Water Level, Sag, 20% of the vertical dimension, Finish
S2
290.3 AMH Manhole / Headworks
12/8/2023 Grant Light U-0417-07007899 7002 - Headworks
No Pre-Cleaning Downstream 290.30 ' 290.30 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
2300 0000 6.0 0.0 6.0 2.0 0.0 2.0
7002
Headworks
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 18
City: McFarland Drainage Area: Upstream MH: 7004
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7002
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 24 " Sewer Category: SEC Joints passed: 0
Pipe material: Polyvinyl Chloride Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:3749 Distance Code Observation Grade
0.0 AMH Manhole / 7004
0.0 MWL Water Level, 10% of the vertical dimension
307.9 S01 MWLS Miscellaneous Water Level, Sag, 30% of the vertical dimension, Start
377.2 F01 MWLS Miscellaneous Water Level, Sag, 30% of the vertical dimension, Finish
S2
496.7 AMH Manhole / 7002
12/8/2023 Grant Light U-0417-07007899 7004 - 7002
No Pre-Cleaning Downstream 496.70 ' 496.70 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
2A00 0000 28.0 0.0 28.0 2.0 0.0 2.0
7004
7002
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 21
City: McFarland Drainage Area: Upstream MH: 7005
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7004
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 24 " Sewer Category: SEC Joints passed: 0
Pipe material: Polyvinyl Chloride Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:5123 Distance Code Observation Grade
0.0 AMH Manhole / 7004
0.0 MWL Water Level, 15% of the vertical dimension
156.1 MSA Miscellaneous Survey Abandoned / Reached overlap 678.7 End of pipe
12/8/2023 Grant Light U-0417-07007899 7005 - 7004
No Pre-Cleaning Upstream 678.70 ' 156.10 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0.0 0.0 0.0 0.0 0.0 0.0
7004
7005
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 23
City: McFarland Drainage Area: Upstream MH: 7005
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7004
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 24 " Sewer Category: SEC Joints passed: 0
Pipe material: Polyvinyl Chloride Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:5123 Distance Code Observation Grade
0.0 AMH Manhole / 7005
0.0 MWL Water Level, 10% of the vertical dimension
119.3 S01 MWLS Miscellaneous Water Level, Sag, 20% of the vertical dimension, Start
203.2 F01 MWLS Miscellaneous Water Level, Sag, 20% of the vertical dimension, Finish
S2
283.1 S02 MWLS Miscellaneous Water Level, Sag, 20% of the vertical dimension, Start
403.4 F02 MWLS Miscellaneous Water Level, Sag, 20% of the vertical dimension, Finish
S2
516.8 S03 MWLS Miscellaneous Water Level, Sag, 20% of the vertical dimension, Start
522.6 F03 MWLS Miscellaneous Water Level, Sag, 20% of the vertical dimension, Finish
S2
522.6 MSA Miscellaneous Survey Abandoned / Camera slipping 678.7 End of pipe
12/8/2023 Grant Light U-0417-07007899 7005 - 7004
No Pre-Cleaning Downstream 678.70 ' 522.60 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
2G00 0000 84.0 0.0 84.0 2.0 0.0 2.0
7005
7004
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 43
City: McFarland Drainage Area: Upstream MH: 7007
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7005
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 24 " Sewer Category: SEC Joints passed: 0
Pipe material: Polyvinyl Chloride Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:5121 Distance Code Observation Grade
0.0 AMH Manhole / 7007
0.0 MWL Water Level, 10% of the vertical dimension
678.5 AMH Manhole / 7005
12/8/2023 Grant Light U-0417-07007899 7007 - 7005
No Pre-Cleaning Downstream 678.50 ' 678.50 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0.0 0.0 0.0 0.0 0.0 0.0
7007
7005
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 52
City: McFarland Drainage Area: Upstream MH: 7009
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7007
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 24 " Sewer Category: SEC Joints passed: 0
Pipe material: Polyvinyl Chloride Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:5078 Distance Code Observation Grade
0.0 AMH Manhole / 7009
0.0 MWL Water Level, 10% of the vertical dimension
672.8 AMH Manhole / 7007
12/8/2023 Grant Light U-0417-07007899 7009 - 7007
No Pre-Cleaning Downstream 672.80 ' 672.80 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0.0 0.0 0.0 0.0 0.0 0.0
7009
7007
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 279
City: McFarland Drainage Area: Upstream MH: 7050
Street: Perkins Ave Media Label: Up Rim to Invert: 0.0
Location Code: Flow Control: Downstream MH: 7049
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 12 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:1622 Distance Code Observation Grade
0.0 AMH Manhole / 7050
0.0 MWL Water Level, 20% of the vertical dimension
16.1 MWL Water Level, 10% of the vertical dimension
16.4 VC Vermin Cockroach, within 8 inch M1
24.4 MWL Water Level, 15% of the vertical dimension
34.1 MWL Water Level, 20% of the vertical dimension
71.5 CS Crack Spiral from 7 o'clock to 8 o'clock, within 8 inch S2
84.1 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 117.1 FM Fracture Multiple from 10 o'clock to 1 o'clock, within 8 inch S4 122.7 TFC Tap Factory Made Capped at 10 o'clock, dia/height: 6inch, within 8 inch
153.4 CS Crack Spiral from 7 o'clock to 8 o'clock, within 8 inch S2 154.0 MWL Water Level, 10% of the vertical dimension
161.4 FM Fracture Multiple from 10 o'clock to 12 o'clock, within 8 inch S4 186.0 FM Fracture Multiple from 11 o'clock to 4 o'clock, within 8 inch S4 190.2 FM Fracture Multiple from 8 o'clock to 4 o'clock, within 8 inch S4 198.4 FM Fracture Multiple from 7 o'clock to 4 o'clock, within 8 inch S4 12/4/2023 Grant Light U-0417-07007899 7050 - 7049
No Pre-Cleaning Downstream 342.00 ' 342.00 '
7050
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 280
1:1622 Distance Code Observation Grade
231.4 FM Fracture Multiple from 12 o'clock to 5 o'clock, within 8 inch S4 257.3 TFC Tap Factory Made Capped at 10 o'clock, dia/height: 6inch, within 8 inch
275.5 B Broken from 8 o'clock to 4 o'clock, within 8 inch S4 342.0 AMH Manhole / 7049
12/4/2023 Grant Light U-0417-07007899 7050 - 7049
No Pre-Cleaning Downstream 342.00 ' 342.00 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4822 1100 36.0 1.0 37.0 3.6 1.0 3.4
7049
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 287
City: McFarland Drainage Area: Upstream MH: 7051
Street: E Perkins Ave Media Label: Up Rim to Invert: 0.0 Location Code: Flow Control: Downstream MH: 7050
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 12 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:2744 Distance Code Observation Grade
0.0 AMH Manhole / 7051
0.0 MWL Water Level, 20% of the vertical dimension
5.7 B Broken from 12 o'clock to 4 o'clock, within 8 inch S4
45.9 VC Vermin Cockroach, within 8 inch M1
67.6 MWL Water Level, 10% of the vertical dimension
97.5 TF Tap Factory Made at 9 o'clock, dia/height: 6inch, within 8 inch
163.2 MWL Water Level, 20% of the vertical dimension
194.6 MWL Water Level, 10% of the vertical dimension
216.9 MWL Water Level, 20% of the vertical dimension
264.6 MWL Water Level, 10% of the vertical dimension
286.9 TFC Tap Factory Made Capped at 10 o'clock, dia/height: 6inch, within 8 inch
363.5 AMH Manhole / 7050
12/4/2023 Grant Light U-0417-07007899 7051 - 7050
No Pre-Cleaning Downstream 363.50 ' 363.50 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4100 1100 4.0 1.0 5.0 4.0 1.0 2.5
7051
7050
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 291
City: McFarland Drainage Area: Upstream MH: 7052
Street: E Perkins Ave Media Label: Up Rim to Invert: 0.0 Location Code: Flow Control: Downstream MH: 7051
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 12 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Cured in Place Owner:
Additional Info:
1:1514 Distance Code Observation Grade
0.0 AMH Manhole / 7052
0.0 MWL Water Level, 25% of the vertical dimension
4.8 MWL Water Level, 35% of the vertical dimension
5.4 LFZ Lining Feature Other at 8 o'clock / Seam Tape peeling off
6.1 VC Vermin Cockroach, within 8 inch M1
10.3 MWL Water Level, 40% of the vertical dimension
23.6 MWL Water Level, 30% of the vertical dimension
43.4 MWL Water Level, 50% of the vertical dimension
45.6 LFZ Lining Feature Other at 10 o'clock, within 8 inch / Seam Tape peeling off
80.9 MWL Water Level, 65% of the vertical dimension
91.5 MWL Water Level, 40% of the vertical dimension
104.8 MWL Water Level, 30% of the vertical dimension
130.4 MWL Water Level, 40% of the vertical dimension
156.3 MWL Water Level, 30% of the vertical dimension
164.1 TFD Tap Factory Made Defective at 9 o'clock, dia/height: 8inch, within 8 inch / FC
M3
12/4/2023 Grant Light U-0417-07007899 7052 - 7051
No Pre-Cleaning Downstream 482.90 ' 482.90 '
7052
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 292
1:1514 Distance Code Observation Grade
217.4 LFZ Lining Feature Other at 10 o'clock / Seem tape peeling off 217.4 MWL Water Level, 25% of the vertical dimension
257.0 LFZ Lining Feature Other at 9 o'clock, within 8 inch / Seem tape peeling off
267.8 LFZ Lining Feature Other from 8 o'clock to 9 o'clock, within 8 inch / Seem Tape peeling off
272.8 MWL Water Level, 20% of the vertical dimension
332.5 TFC Tap Factory Made Capped at 9 o'clock, dia/height: 4inch, within 8 inch
367.9 TF Tap Factory Made at 10 o'clock, dia/height: 4inch, within 8 inch
402.5 MWL Water Level, 30% of the vertical dimension
444.6 LFZ Lining Feature Other at 11 o'clock, within 8 inch / Seem Tape peeling off
479.2 DAR Deposits Attached Ragging, 10% of cross sectional area at 4 o'clock
M2
482.9 AMH Manhole / 7051
12/4/2023 Grant Light U-0417-07007899 7052 - 7051
No Pre-Cleaning Downstream 482.90 ' 482.90 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 3121 0.0 6.0 6.0 0.0 2.0 2.0
7051
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 300
City: McFarland Drainage Area: Upstream MH: 7053
Street: E Perkins Ave Media Label: Up Rim to Invert: 0.0 Location Code: Flow Control: Downstream MH: 7052
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 12 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Cured in Place Owner:
Additional Info:
1:831 Distance Code Observation Grade
0.0 AMH Manhole / 7053
0.0 MWL Water Level, 55% of the vertical dimension
3.6 MWL Water Level, 65% of the vertical dimension
26.2 VC Vermin Cockroach, within 8 inch M1
26.2 MWL Water Level, 55% of the vertical dimension
40.3 MWL Water Level, 40% of the vertical dimension
43.4 MWL Water Level, 20% of the vertical dimension
58.2 S01 MWLS Miscellaneous Water Level, Sag, 50% of the vertical dimension, Start
110.1 F01 MWLS Miscellaneous Water Level, Sag, 50% of the vertical dimension, Finish
S3
110.1 AMH Manhole / 7052
12/4/2023 Grant Light U-0417-07007899 7053 - 7052
No Pre-Cleaning Downstream 110.10 ' 110.10 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
3A00 1100 30.0 1.0 31.0 3.0 1.0 2.8
7053
7052
Downstream Services, Inc.
2855 Progress Pl, Escondido
Tel. (760)746-2544
[email protected]
Inspection report
Date: Work Order: Weather: Surveyed By: Certificate Number: Pipe Segment Ref.:
Year laid: Pre-cleaning: Pipe Joint Length: Direction: Total Length: Length Surveyed:
City of McFarland // Page: 304
City: McFarland Drainage Area: Upstream MH: 7054
Street: E Perkins Ave Media Label: Up Rim to Invert: 0.0 Location Code: Flow Control: Downstream MH: 7053
Location Details: Sheet Number: Down Rim to Invert: 0.0 Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0 Pipe size: 12 " Sewer Category: SEC Joints passed: 0
Pipe material: Vitrified Clay Pipe Purpose: Joints failed: 0 Lining Method: Owner:
Additional Info:
1:2194 Distance Code Observation Grade
0.0 AMH Manhole / 7054
0.0 MWL Water Level, 10% of the vertical dimension
15.1 VC Vermin Cockroach, within 8 inch M1
42.4 FM Fracture Multiple from 11 o'clock to 2 o'clock, within 8 inch S4
42.4 FS Fracture Spiral from 7 o'clock to 9 o'clock, within 8 inch S3
50.5 FM Fracture Multiple from 9 o'clock to 5 o'clock, within 8 inch S4
58.5 FS Fracture Spiral from 2 o'clock to 3 o'clock, within 8 inch S3
58.5 FL Fracture Longitudinal at 12 o'clock, within 8 inch S3
67.3 FM Fracture Multiple from 7 o'clock to 5 o'clock, within 8 inch S4 100.2 FS Fracture Spiral from 10 o'clock to 2 o'clock, within 8 inch S3 108.5 FS Fracture Spiral from 12 o'clock to 3 o'clock, within 8 inch S3 162.2 FM Fracture Multiple from 10 o'clock to 3 o'clock, within 8 inch S4 191.4 S01 MWLS Miscellaneous Water Level, Sag, 70% of the vertical dimension, Start
235.6 TBD Tap Break-In Defective at 9 o'clock, dia/height: 10inch, within 8 inch / DSF
M3
290.7 F01 MWLS Miscellaneous Water Level, Sag, 70% of the vertical dimension, Finish
S4
290.7 AMH Manhole / 7053
12/4/2023 Grant Light U-0417-07007899 7054 - 7053
No Pre-Cleaning Downstream 290.70 ' 290.70 '
QSR QMR SPR MPR OPR SPRI MPRI OPRI
4C35 3111 111.0 4.0 115.0 3.8 2.0 3.7
7054
7053
APPENDIX C - PRELIMINARY PROJECT COST ESTIMATES
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Manhole and Wet Well Interior Coating Project
Preliminary Project Cost Estimate
Date Prepared: May 2024
BID ITEM
NO. DESCRIPTION
Bid Quantity Unit of
Measure Unit Price Total
1 Mobilization 1 LS $ 5,000 $ 5,000
2 Stormwater Management (WPCP) 1 LS $ 5,000 $ 5,000
3 Project Safety & Traffic Control 1 LS $ 10,000 $ 10,000 4 Apply Epoxy/Polyurathane Coating to Manhole
Interior 12 EA $ 6,000 $ 72,000
21 Apply Epoxy/Polyurathane Interior Coating to Hail &
Fifth Lift Station Wet Well 1 LS $ 9,000 $ 9,000
22 Apply Epoxy/Polyurathane Interior Coating to San
Juan Lift Station Wet Well 1 LS $ 9,000 $ 9,000
25 Perform Miscellaneous Work (T&M not to exceed) - T&M $ 5,000 $ 5,000 TOTAL $ 115,000
Contingency: 25% 28,750 $
Construction Total: $ 144,000
Notes:
Association for the Advancement of Cost Engineering (AACE)
1. Based on the current level of "project" definition, this cost estimate is considered a Class 4 estimate with an accuracy range of -20% to +30%. See table below.
2. It is assumed that City staff will perform the minor engineering and inspection for this project.
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Manhole and Lift Station Access Improvement Project
Preliminary Project Cost Estimate
Date Prepared: May 2024
BID ITEM
NO. DESCRIPTION
Bid Quantity Unit of
Measure Unit Price Total
1 Mobilization 1 LS $ 5,000 $ 5,000
2 Stormwater Management (WPCP) 1 LS $ 5,000 $ 5,000
3 Project Safety & Traffic Control 1 LS $ 10,000 $ 10,000 4 Replace Manhole Rim and Collar 9 EA $ 8,000 $ 72,000
5 Repace Access Hatch at Hail & Fifth Lift Station 1 LS $ 20,000 $ 20,000 6 Construct 6” Thick AC Paving 180 SF $ 40.00 $ 7,200
25 Perform Miscellaneous Work (T&M not to exceed) - T&M $ 5,000 $ 5,000 TOTAL $ 124,200
Contingency: 25% 31,050 $
Construction Total: $ 156,000
Notes:
Association for the Advancement of Cost Engineering (AACE)
1. Based on the current level of "project" definition, this cost estimate is considered a Class 4 estimate with an accuracy range of -20% to +30%. See table below.
2. It is assumed that City staff will perform the minor engineering and inspection for this project.
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Lift Station Control Panel & Electrical Upgrade Project Preliminary Project Cost Estimate
Date Prepared: May 2024
BID ITEM
NO. DESCRIPTION
Bid Quantity Unit of
Measure Unit Price Total
1 Mobilization 1 LS $ 10,000 $ 10,000
2 Project Safety & Traffic Control 1 LS $ 3,000 $ 3,000 3 Replace Control Panel at Hail & Fifth Lift Station 1 LS $ 40,000 $ 40,000 4 Replace Control Panel at San Juan Lift Station 1 LS $ 40,000 $ 40,000 5 Install Pigtail Generator Connection at Hail & Fifth
Lift Station 1 LS $ 3,500 $ 3,500
6 Install Pigtail Generator Connection at San Juan
Lift Station 1 LS $ 3,500 $ 3,500
7 Install Security Lighting at Hail & Fifth LS 1 LS $ 20,000 $ 20,000 8 Install Security Lighting at Hail & Garzoli LS 1 LS $ 20,000 $ 20,000 9 Replace Deteriorated Wiring at Hail & Fifth LS 1 LS $ 10,000 $ 10,000 10 Resolve Voltage and Communication Problem at
Hail & Garzoli LS 1 LS $ 15,000 $ 15,000
11 Perform SCADA System Modifications for Hail &
Fifth LS 1 LS $ 7,500 $ 7,500
12 Perform SCADA System Modifications for San Juan
LS 1 LS $ 7,500 $ 7,500
13 Perform Miscellaneous Work (T&M not to exceed) - T&M $ 10,000 $ 10,000 TOTAL $ 190,000
Contingency: 25% 47,500 $
Construction Total: 238,000 $
Design/Engineering: 7.5% 18,000 $
Construction Management & Inspection: 7.5% 18,000 $
Grand Total (rounded): $ 274,000
Notes:
1. Based on the current level of "project" definition, this cost estimate is considered a Class 4 estimate with an accuracy range of -20% to +30%. See table below.
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Lift Station Control Panel & Electrical Upgrade Project Preliminary Project Cost Estimate
Association for the Advancement of Cost Engineering (AACE)
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Lift Station Pump Replacement Project
Preliminary Project Cost Estimate
Date Prepared: May 2024
BID ITEM
NO. DESCRIPTION
Bid Quantity Unit of
Measure Unit Price Total
1 Mobilization 1 LS $ 10,000 $ 10,000
2 Project Safety & Traffic Control 1 LS $ 2,000 $ 2,000 3 Replace Pump at Hail & Garzoli Lift Station 2 EA $ 30,000 $ 60,000 4 Construct Electrical System Modifications at Hail &
Garzoli LS 1 LS $ 8,000 $ 8,000
5 Perform SCADA System Modifications for Hail &
Garzoli LS 1 LS $ 5,000 $ 5,000
6 Replace Pump at San Juan Lift Station 2 EA $ 30,000 $ 60,000 7 Construct Electrical System Modifications at San
Juan LS 1 LS $ 8,000 $ 8,000
8 Perform SCADA System Modifications for San Juan
LS 1 LS $ 5,000 $ 5,000
9 Perform Miscellaneous Work (T&M not to exceed) - T&M $ 5,000 $ 5,000 TOTAL $ 163,000
Contingency: 25% 40,750 $
Construction Total: 204,000 $
Design/Engineering: 7.5% 16,000 $
Construction Management & Inspection: 7.5% 16,000 $
Grand Total (rounded): $ 236,000
Notes:
1. Based on the current level of "project" definition, this cost estimate is considered a Class 4 estimate with an accuracy range of -20% to +30%. See table below.
2. It is assumed that minor electrical and SCADA modifications are required for this project.
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Lift Station Pump Replacement Project
Preliminary Project Cost Estimate
Association for the Advancement of Cost Engineering (AACE)
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Manhole Replacement Project
Preliminary Project Cost Estimate
Date Prepared: May 2024
BID ITEM
NO. DESCRIPTION
Bid Quantity Unit of
Measure Unit Price Total
1 Mobilization 1 LS $ 2,500 $ 2,500
2 Stormwater Management (WPCP) 1 LS $ 3,500 $ 3,500
3 Project Safety & Traffic Control 1 LS $ 3,500 $ 3,500 4 Pothole Utilities 1 EA $ 1,500 $ 1,500
5 Install Precast Concrete Manhole (5' Diameter) 1 EA $ 24,000 $ 24,000 6 Construct 1.5-Sack Cement Slurry Backfill 12 CY $ 180 $ 2,160 7 Construct 6” Thick AC Paving 100 SF $ 40.00 $ 4,000
TOTAL $ 41,160
Contingency: 25% 10,290 $
Construction Total: $ 52,000
Notes:
1. Based on the current level of "project" definition, this cost estimate is considered a Class 4 estimate with an accuracy range of -20% to +30%. See table below.
2. It is assumed all trenches will be backfilled with 1.5-sack cement slurry.
3. It is assumed that City staff will perform the minor engineering and inspection for this project.
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Manhole Replacement Project
Preliminary Project Cost Estimate
Association for the Advancement of Cost Engineering (AACE)
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Trunk Sewers CCTV Inspection
Preliminary Project Cost Estimate
Date Prepared: May 2024
BID ITEM
NO. DESCRIPTION
Bid Quantity Unit of
Measure Unit Price Total
1 CCTV Video Inspection 30 Days $ 3,350 $ 100,500
2 CCTV Inspection Report 1 LS $ 9,500 $ 9,500
TOTAL $ 110,000
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Consolidated Headworks Trunk Sewer Line Project
Preliminary Project Cost Estimate
Date Prepared: May 2024
BID ITEM
NO. DESCRIPTION
Bid Quantity Unit of
Measure Unit Price Total
1 Mobilization 1 LS $ 35,000 $ 35,000
2 Stormwater Management (WPCP) 1 LS $ 8,000 $ 8,000
3 Project Safety & Traffic Control 1 LS $ 7,000 $ 7,000 4 Surveying & Construction Staking 1 LS $ 10,000 $ 10,000 5 Pothole Utilities 3 EA $ 1,200 $ 3,600
6 Bypass Pumping System 4 WKS $ 8,000 $ 32,000
7 Install 42" PS-115 PVC Sewer 400 LF $ 780 $ 312,000
8 Trench Shoring 430 LF $ 50 $ 21,500
9 Install Gravel Bedding in Pipe Zone 220 CY $ 210 $ 46,200 10 Install Precast Concrete Manhole (6' Diameter) 3 EA $ 27,000 $ 81,000 11 Construct 1.5-Sack Cement Slurry Trench Backfill 340 CY $ 180 $ 61,200 12 Connect to Headworks 1 LS $ 40,000 $ 40,000
13 Construct Concrete Repairs 200 SF $ 65 $ 13,000
14 Construct 6” Thick AC Paving 4,300 SF $ 15.00 $ 64,500 15 Reset Kern County Survey Monument 1 EA $ 8,000 $ 8,000 16 Install Traffic Striping & Pavement Legends 1 LS $ 5,000 $ 5,000 18 Perform Miscellaneous Work (T&M not to exceed) - T&M $ 20,000 $ 20,000 TOTAL $ 768,000
Contingency: 25% 192,000 $
Construction Total: 960,000 $
Design/Engineering: 6.0% 58,000 $
Construction Management & Inspection: 7.0% 68,000 $
Grand Total (rounded): $ 1,086,000
Notes:
1. Based on the current level of "project" definition, this cost estimate is considered a Class 4 estimate with an accuracy range of -20% to +30%. See table below.
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Consolidated Headworks Trunk Sewer Line Project
Preliminary Project Cost Estimate
Association for the Advancement of Cost Engineering (AACE)
2. It is assumed all trenches will be backfilled with 1.5-sack cement slurry.
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Perkins Trunk Sewer Line Upgrade Project
Preliminary Project Cost Estimate
Date Prepared: May 2024
BID ITEM
NO. DESCRIPTION
Bid Quantity Unit of
Measure Unit Price Total
1 Mobilization 1 LS $ 250,000 $ 250,000
2 Stormwater Management (WPCP) 1 LS $ 25,000 $ 25,000
3 Project Safety & Traffic Control 1 LS $ 25,000 $ 25,000 4 Surveying & Construction Staking 1 LS $ 20,000 $ 20,000 5 Pothole Utilities 5 EA $ 1,200 $ 6,000
6 Bypass Pumping System 12 WKS $ 8,000 $ 96,000
7 Install 36" PS-115 PVC Sewer 5,767 LF $ 625 $ 3,604,375 8 Trench Shoring 5,787 LF $ 40 $ 231,480
9 Install Gravel Bedding in Pipe Zone 1,570 CY $ 190 $ 298,300 10 Install Precast Concrete Manhole (5' Diameter) 9 EA $ 24,000 $ 216,000 11 Construct 1.5-Sack Cement Slurry Trench Backfill 3,430 CY $ 165 $ 565,950 12 Connect to Downstream Manhole 1 LS $ 25,000 $ 25,000 13 Construct Concrete Repairs 200 SF $ 65 $ 13,000
14 Construct 6” Thick AC Paving 34,800 SF $ 13.50 $ 469,800 15 Reset Kern County Survey Monument 2 EA $ 8,000 $ 16,000 16 Install Traffic Striping & Pavement Legends 1 LS $ 15,000 $ 15,000 17 Perform Miscellaneous Work (T&M not to exceed) - T&M $ 30,000 $ 30,000 TOTAL $ 5,906,905
Contingency: 25% 1,476,726 $
Construction Total: 7,384,000 $
Design/Engineering: 5.5% 407,000 $
Construction Management & Inspection: 6.5% 480,000 $
Grand Total (rounded): $ 8,271,000
Notes:
1. Based on the current level of "project" definition, this cost estimate is considered a Class 4 estimate with an accuracy range of -20% to +30%. See table below.
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Perkins Trunk Sewer Line Upgrade Project
Preliminary Project Cost Estimate
Association for the Advancement of Cost Engineering (AACE)
2. It is assumed all trenches will be backfilled with 1.5-sack cement slurry.
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Stradley-Taylor Trunk Sewer (Middle Segments) Project
Preliminary Project Cost Estimate
Date Prepared: June 2024
BID ITEM
NO. DESCRIPTION
Bid Quantity Unit of
Measure Unit Price Total
1 Mobilization 1 LS $ 750,000 $ 750,000
2 Stormwater Management (WPCP) 1 LS $ 30,000 $ 30,000
3 Project Safety & Traffic Control 1 LS $ 30,000 $ 30,000 4 Surveying & Construction Staking 1 LS $ 25,000 $ 25,000 5 Pothole Utilities 7 EA $ 1,200 $ 8,400
6 Install 30" PS-115 PVC Sewer 18,778 LF $ 525 $ 9,858,450 7 Trench Shoring 18,798 LF $ 40 $ 751,920
8 Install Gravel Bedding in Pipe Zone 4,240 CY $ 190 $ 805,600 9 Install Precast Concrete Manhole (5' Diameter) 29 EA $ 24,000 $ 696,000 10 Construct 1.5-Sack Cement Slurry Trench Backfill 9,260 CY $ 165 $ 1,527,900 11 Connect to Downstream Manhole 1 LS $ 25,000 $ 25,000 12 Construct Concrete Repairs 400 SF $ 65 $ 26,000
13 Construct 6” Thick AC Paving 93,900 SF $ 13.50 $ 1,267,650 14 Reset Kern County Survey Monument 3 EA $ 8,000 $ 24,000 15 Install Traffic Striping & Pavement Legends 1 LS $ 25,000 $ 25,000 16 Perform Miscellaneous Work (T&M not to exceed) - T&M $ 30,000 $ 30,000 TOTAL $ 15,880,920
Contingency: 25% 3,970,230 $
Construction Total: 19,852,000 $
Design/Engineering: 5.5% 1,092,000 $
Construction Management & Inspection: 6.5% 1,291,000 $
Grand Total (rounded): $ 22,235,000
Notes:
1. Based on the current level of "project" definition, this cost estimate is considered a Class 4 estimate with an accuracy range of -20% to +30%. See table below.
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Stradley-Taylor Trunk Sewer (Middle Segments) Project
Preliminary Project Cost Estimate
Association for the Advancement of Cost Engineering (AACE)
2. It is assumed all trenches will be backfilled with 1.5-sack cement slurry.
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Stradley-Taylor Trunk Sewer (Upstrem Segments) Project
Preliminary Project Cost Estimate
Date Prepared: June 2024
BID ITEM
NO. DESCRIPTION
Bid Quantity Unit of
Measure Unit Price Total
1 Mobilization 1 LS $ 250,000 $ 250,000
2 Stormwater Management (WPCP) 1 LS $ 30,000 $ 30,000
3 Project Safety & Traffic Control 1 LS $ 30,000 $ 30,000 4 Surveying & Construction Staking 1 LS $ 25,000 $ 25,000 5 Pothole Utilities 7 EA $ 1,200 $ 8,400
6 Install 18" PS-115 PVC Sewer 12,446 LF $ 315 $ 3,920,490 7 Install 21" PS-115 PVC Sewer 6,477 LF $ 365 $ 2,364,105 8 Install 30" PS-115 PVC Sewer 2,581 LF $ 525 $ 1,355,025 9 Trench Shoring 21,534 LF $ 40 $ 861,360
10 Install Gravel Bedding in Pipe Zone 3,400 CY $ 190 $ 646,000 11 Install Precast Concrete Manhole (5' Diameter) 33 EA $ 24,000 $ 792,000 12 Construct 1.5-Sack Cement Slurry Trench Backfill 7,420 CY $ 165 $ 1,224,300 13 Connect to Downstream Manhole 3 EA $ 25,000 $ 75,000 14 Construct Concrete Repairs 400 SF $ 65 $ 26,000
15 Construct 6” Thick AC Paving 75,300 SF $ 13.50 $ 1,016,550 16 Reset Kern County Survey Monument 3 EA $ 8,000 $ 24,000 17 Install Traffic Striping & Pavement Legends 1 LS $ 25,000 $ 25,000 18 Perform Miscellaneous Work (T&M not to exceed) - T&M $ 30,000 $ 30,000 TOTAL $ 12,703,230
Contingency: 25% 3,175,808 $
Construction Total: 15,880,000 $
Design/Engineering: 5.5% 874,000 $
Construction Management & Inspection: 6.5% 1,033,000 $
Grand Total (rounded): $ 17,787,000
Notes:
CITY OF MC FARLAND
Sewer Collection System Master Plan - Capital Improvement Program Stradley-Taylor Trunk Sewer (Upstrem Segments) Project
Preliminary Project Cost Estimate
Association for the Advancement of Cost Engineering (AACE)
1. Based on the current level of "project" definition, this cost estimate is considered a Class 4 estimate with an accuracy range of -20% to +30%. See table below.
2. It is assumed all trenches will be backfilled with 1.5-sack cement slurry.
City of McFarland
City Council Meeting
STAFF REPORT
Agenda Item No. 9.
Section: PUBLIC HEARINGS
Meeting Date: August 8, 2024
TO: Honorable Mayor and Council Members
FROM: Diego Viramontes, City Manager
Paul Saldaña , Community Development Director
SUBJECT: Introduce, by title only Ordinance 11-2024, AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF MCFARLAND AMENDING CHAPTER 5.04 OF
THE MCFARLAND MUNICIPAL CODE RELATING TO BUSINESS LICENSES SUMMARY:
Chapter 5.04 of the McFarland Municipal Code regulates the issuance of business taxes and licenses within the City limits. There are currently uses within the City for which a business license rate is not defined other than the general annual gross receipts.
The proposed ordinance would provide for an additional category called "animal confinement/breeding/raising" which would provide for an annual fee of $2,000 per acre for the business license. This fee is preferable than a "per confined animal" or annual gross receipts since it would be difficult for the City to verify these options, while an acre measurement can be adequately audited.
FINANCIAL IMPACT:
An increase of $146,000 in general fund revenue is estimated from the modifications to the business license fee structure.
RECOMMENDATION:
City Council waive full reading and introduce by title only Ordinance 11-2024 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF MCFARLAND AMENDING CHAPTER 5.04 OF
THE MUNICIPAL CODE RELATING TO BUSINESS LICENSES
ATTACHMENTS:
None
ORDINANCE NO. 11-2024
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
MCFARLAND AMENDING CHAPTER 5.04 OF THE MUNICIPAL
CODE RELATING TO BUSINESS LICENSES
Section 1. Recitals
WHEREAS, Article XI section 7 of the California Constitution provides authority to the City of McFarland to adopt ordinances and regulations for businesses transacted in the City, and WHEREAS, Chapter 5.04 of the McFarland Municipal Code regulates business license and business license fees, and
WHEREAS, the City currently has no fees identified for businesses that operate animal confinement, breeding, and raising operations.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF MCFARLAND DOES ORDAIN AS FOLLOWS:
Section 1. The following is added to Section A of Chapter 5.04.140 as follows:
Business Type Annually/Daily/Per Event/
Unit Tax Amount
Animal Confinement/Breeding/Raising$1,000 per acre
Section 7. Notice. The City Clerk shall certify to the passage and adoption of this ordinance and shall cause this Ordinance to be posted within 15 days after its passage, in accordance with Section 36933 of the Government Code.
Section 8. Severability. If any section, subsection, sentence, clause, phrase, or word of this Ordinance is, for any reason, deemed or held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, or preempted by legislative enactment, such decision or legislation shall not affect the validity of the remaining portions of this Ordinance. The City Council of the City of McFarland hereby declares that it would have adopted this Ordinance and each section, subsection, sentence, clause, phrase, or word thereof, regardless of the fact that any one or more sections, subsections, clauses, phrases, or word might subsequently be declared invalid or unconstitutional or preempted by subsequent legislation.
Section 9. Effective Date. This Ordinance shall take effect thirty days after its adoption pursuant to California Government Code section 36937.
Section 10. Certification; Publication. The City Clerk shall certify to the passage and adoption of this Ordinance and shall cause the same to be published or posted according to law.
INTRODUCED, at a regular meeting of the City Council of the City of McFarland, California on 8/8/2024, by the following vote:
PASSED AND ADOPTED at a regular meeting of the City Council of the City of McFarland on by the following vote:
Aye Nae Abstain Absent
Saul Ayon
Ricardo Cano
Amador Ayon
Anita Gonzalez
María T. Pérez
______________________________
Saul Ayon, Mayor
I hereby certify that the foregoing Ordinance was duly and regularly adopted by the City Council of the City of McFarland by a regular meeting thereof held on August 8, 2024.
ATTEST:
________________________________
Paul M. Saldana, Interim City Clerk