Cities Index.
Quote from Bridge Brothers

Menifee City Council
December 6, 2023

Document
Quote from Bridge Brothers
Meeting
December 6, 2023
Body
Menifee City Council
Original file
764 KB
Text extracted from the city's file for reading and search. Open the original on cityofmenifee.primegov.com. That file is the official record.

e:
[email protected]
t:
866.258.3401
www.bridgebrothers.com
Date:September28th,2023
Project:Menifee,CA-PalomaWashPedestrianBridge
Scope:BridgeDesign,BridgeManufacturing
Contact:KennyAdams
OurEstimatebelowdefiesourfullscopeofworkforthebridgesontheabove-referencedproject. Thepriceonthisproposalisonlyvalidforthirty(30)days.

BridgeBrother’sscopewillincludeallstructuralengineering,manufacturing,deliveryofstructures,andoffloading. Anyassociateddesignswillbeinadherencetotheengineeringstandardsoutlinedintheproposal. AnyadditionalworkoutsideoftheproposedscopebelowwillbepricedintheformofaChangeOrder.

StructuralEngineering: Included ● SinglePEStampedDesign&CalculationPackagebyonePEo Designexcludesanchordesign,bearingdesign,andconcretedeckdesign BridgeManufacturing(ExcludingSalesTax): $689,422 ● Qty14’x174’TypeBridge● BridgeDesignandMemberSizeisBasedonBridgeBrothersStampedDesign● WeatheringSteelStructure● BowstringTrussConfiguration● Galvanized/CorrugatedDeckingpreppedforRebar/Concrete○ Rebar/ConcreteSuppliedandInstalledbyOthers○ DeckingShippedLoose(Deckmaybeshippedlooseperbridgedesignatthediscretionofthemanufacturer)● H-10VehicularLoading● 90PSFLiveLoading● PaintedAluminumPicketSafetyRailing○ IPERubRailIncluded● TrussandFloorSplices● BridgePreppedforCanopypostsandCanopy○ PostsandCanopysuppliedbyOthers-● SalesTaxisEXCLUDED

TURNKEYPREFABRICATEDBRIDGES

e:
[email protected]
t:
866.258.3401
www.bridgebrothers.com
● FreighttoProjectSite(FOB)○ Thebridgewillbeshippedin6pieces( Lengthandorfloorsplice)withacurrentestimatedvalueoffreightof($105,000)○ Estimatedtotalbridgeweightis(125,000#)● BridgeBrotherscannotbeheldliableformaterial,freight,onsiteequipment,orlaborescalationsduetoactsofGodandotherunforeseenacts.Theinitial/offloadingbridgedropsitemustbewithin15'ofwherethedeliverytruckscandeliver.● Warrantyshallbenullandvoidunlessthecustomerprovidesrecordsthatverifycompliancewithminimumguidelinesspecifiedinthe“Inspection+MaintenanceRecommendations”attachedtothisproposal● Allexpansionjointsattheendsofthebridgearethebridgeinstaller’sresponsibilityunlessotherarrangementshavebeenmadewiththebridgemanufacturer. Therewillbenoexpansionjointsinsidethebridge.BridgeBrotherswillprovidedesigndataoftheextremeendsofthebridgewherethebridgemeetstheabutments.

BridgeOffLoading: $63,000 ● Off-loadingoftheabove-detailedbridgeoncustomer-suppliedstagingarea● BridgeBrothersmeansandmethodsofunloadingisatourdiscretion● Sitemusthaveclearaccesstostagingarea● Sitecontractoristoprovideclearcraneaccesswithina15'radiusstagingarea.o Iftheradiusismorethan15’aChangeOrdermaybeissuedforthedifferenceincranevalue.o IfthesitedoesnotmeetthoseconditionsBridgeBrothersmayperformtheworkatT&Mratesatthecustomersapprovaltograntfeasibleaccesstocompletetheinstallation.● CranePads,ifrequiredaretobeprovidedbythecustomerasthediscretionofthecranecompaniespre-sitevisit● Off-loadbridgesections● Liftplanscanbeprovidedatanadditionalexpense● LaneClosuresandTrafficControlisbyothers.Utilitiesandoverheadpowerlinesaretobecovered,protected,orrelocatedattheowner'sexpensepriortoBridgeBrothers'mobilization● BridgeBrotherswillonlyberesponsibleforthepaintedportionsofthestructure,anydamagetothepaintfromoffloadingthebridge.Afterthistime,theGCisresponsibleforthestructureandanytouch-upofthepain BridgeSiteworkProposalsareavailableuponrequest
BridgeBrothersTermsandConditionsaretobesigned

TURNKEYPREFABRICATEDBRIDGES

e:
[email protected]
t:
866.258.3401
www.bridgebrothers.com
EstimatedProjectSchedule
● StructuralDesignPackageo 8weeks● BridgeManufacturingandFreighto 16- 20WeeksfromtheDateofApprovedDrawingsDependingonScope▪ Deliverymayvaryduetomillleadtimes● BridgeErectiono 1-3WeeksDependingonScope Qualifications:
● BridgeBrothersTermsandConditionsarerequiredtobesigned, inthecircumstancewheretheyarenot, pleaseallowaminimumof ten(10) workingdaysfor contract review.● Anylanguagelistedwithinthisproposal shall befullyincorporatedintothefinal contract.● BridgeBrotherswill requireapayment toserveasadeposit tobeginengineeringservices.● BridgeBrotherswill requireapayment followingtheapprovalof engineeringsubmittals.● BridgeBrotherswill requireapayment followingthecompletionof fabrication.● BridgeBrotherswill requirethepayment of ChangeOrdersprior toshipment.● BridgeBrotherswill requireapayment that servesasanerectiondeposit beforeanyBridgeBrothersmobilization.● BridgeBrotherswill not accept anyretentionholdbacksthirty(30) daysafter thecompletionof our scopeof work.● TheCustomer must providesufficient spacefor deliverytruckstosafelyparkandbeunloaded, anytimedelaysat deliverywhichresult inadditional freight chargeswill bebilledtothecustomer.● Meansandmethodsof installationareBridgeBrothersandanymeasurerequestedand/or requiredoutsideof thiswill bechargedat aTimeandMaterial fromour standardratesheet.● Pricingmaybesubject tochangebasedontheGeotechnicalReport, SiteSurvey, andSiteConstraint.● Utilities, overheadpower lines, or anythinginrelationaretobecovered, protected, or relocatedat theCustomers’ expensepriortoBridgeBrother'smobilization.● Sitemust havesufficient siteaccessfor erectionequipment onbothsidesof theproject, thefollowingwill apply:o Sitemust becut/excavatedtogradefor installationmethods, wherethesiteisnot tograde- anyworkrequiredbyBridgeBrotherstomakethesitetogradewill bechargedasaChangeOrder.o BridgeBrothersmust haveaccesswithin10’ ofeachabutment.o BridgeBrothersmust havea16’ pathtoeachabutment (will varydependingonbridgewidth);o CranePads/Matswill besuppliedbyOthers.o BridgeBrothersisnot responsiblefor thefollowing:▪ Treeremoval. ▪ Brushremoval.▪ Excessdirt removal.▪ Excessgrubbing.● Anyequipment or toolsusedonsitethat areowned/rentedbytheCustomer isat theexpenseof theCustomer; BridgeBrotherswill not beresponsiblefor anycost associatedwithsuchunlessdiscussedprior tomobilization.● Thefollowingrequirementsmust besatisfiedinrelationtoUnloadingandSpliceFit UpBridges:o 80%SafetyFactor tobeusedonall cranes, if alower safetypercentageisrequired/requestedandalarger craneisrequired, anycost associatedwithsuchwill bebilledintheformof aChangeOrder.● LaneClosuresandtrafficcontrol will becompletedbyOthersat nocost toBridgeBrothers.● If BridgeBrothersistobepouringthe concretedeck thefollowingapplies:o Thecost associatedwiththeconcretetest/heatingisontheCustomer.o Thecost associatedwiththesealingof concreteisontheCustomer.o Thecost associatedwithanyepoxy-coatedrebar isontheCustomer.o Concreteispouredinconformancetostructuralrequirements, not architectural requirements.o WhereBridgeBrothersperformsanyof theabove-mentionedworkor workinrelationtotheabove-mentionedthiswill bebilledintheformofaChangeOrder at our T&Mstandardrates.● Wheretheproject includescablerailing, BridgeBrotherswilltensioncablestothedesignspecifications:o BridgeBrotherswill leaveatensiontool uponwrittenrequest fromtheCustomer.o BridgeBrotherswill remobilizetotensioncablesfollowingthefinal walkthrough, wheretheCustomer requestsanyre-tensioningof cablerailing; thiswill bebilledintheformof aChangeOrder andwill becompleted at thediscretionoftheBridgeBrothersinstallationschedule.● Wheretheproject ispaintedor galvanizedthefollowingwillapply:o Anyadditional touch-upgalvor paint will becompletedbyBridgeBrotherswhileonsite,anythingrequestedfollowingthefinal walkthroughwill bebilledintheformof aChangeOrder.o BridgeBrotherswill leaveadditional paint withthecustomer followingthefinal walkthrough.● BridgeBrotherswill requireafinal walk-throughwithacustomer representativefollowingsuchaproject completionandtheacceptanceformwill besignedwhileBridgeBrotherspersonnel isonsite.● BridgeBrothersisanondiscriminatoryemployer.Exclusions:

TURNKEYPREFABRICATEDBRIDGES

e:
[email protected]
t:
866.258.3401
www.bridgebrothers.com
● Anyitemnot listedinthisproposal isnot includedinBridgeBrothers' Scopeof Work.● Anyproposedscopeof workadditionswill bebilledintheformof aChangeOrder.● SalesTaxisnot includedhereandshall bepaidbytheCustomer toBridgeBrothers.● WhereBridgeBrothersisrequiredtoobtainhigher insurancelimitstomatchCustomer requirements, thecost of suchwill bebilledintheformof aChangeOrder.● BridgeBrothersreservestheright toadjust pricingfor material,freight, onsiteequipment andlabor escalation.● Anyadditional inspectionbeyondvisual istheresponsibilityofthecustomer.● Anyadditional compliancerequirementsareexcludedfromthisproposal.● Anydesignrevisionafter Rev1submittalswill bebilledintheformof aChangeOrder at our standardhourlyrates.● Anycost associatedwithunionlabor isnot includedinthisproposal. ● Anycost associatedwithprevailingwageisnot includedinthisproposal.● Anycost associatedwithdewateringisnot includedinthisproposal.● Anycost associatedwithsoil compaction, dirt removal, bullrock, erosioncontrol, silt fencing, or anythinginrelationisnotincludedinthisproposal.● BridgeBrothersdoesnot performsiteelevationreferences,centerlinework, sitelayout, surveys, or control points.o Bridgefoundationsand/or supportsmust besurveyedandverifylocations/elevationsandbeprovidedtoBridgeBrothersprior tomobilization.● Duetothenatureof thisbusiness, engineering, andmarketdelaysshall not result inanyconsequential or liquidateddamagesfor whichBridgeBrothersmaybeheldliable.● BridgeBrothersreservestheright tomakescheduleadjustmentsfor installationduetositeconditions.

Ifyouhaveanyfollow-upquestionsinrelationtothisproposalorrequireadditionalinformation,pleasefeelfreetocontactusatthefollowing:KennyAdams/ SalesEngineer/ 770.696.8946/ [email protected]

TURNKEYPREFABRICATEDBRIDGES

1 Jenny McConville
From: Luke Qu
Sent: Tuesday, October 31, 2023 4:37 PM
To: Jenny McConville
Subject: Staff Report for Council Meeting 12/6/23 - CIP 20-13 Paloma Wash Bridge Manufacturer (Bridge Brothers)
Attachments: Paloma Wash, CA - Bridge Proposal - BB3 Revised.pdf Categories: Agenda Reports/CC Items
Hi Jenny,

For the subject project, we posted bid on PlanetBids for bridge design/engineering/manufacture/delivery. We only have one bid from Bridge Brothers. AŌer several iteraƟons of negoƟaƟons, we decided to award to Bridge Brothers. Please see the link below and aƩached to the final proposal.

M:\Public Works Department\_Public Works Projects\CIP Projects\20‐13 Paloma Wash Ped Bridge\B‐ Design\B‐7 RFP\Bridge Brothers Inc. for $752,422\revision 10‐26‐23\Paloma Wash, CA ‐ Bridge Proposal ‐ BB3 Revised.pdf

One thing to noƟce is that the quote broke into two parts: Bridge Manufacturing ‐ $689,422, which is subject to sales tax. But Bridge Brothers will not add sales tax to the quote as they will not be charging the City, but that does not mean that sales tax is not applicable. The City will sƟll pay the sales tax but directly to the State. I confirmed this with Purchasing already. Bridge Off Loading ‐ $63,000. So the total is as follows:

$689,422.00        Taxable PorƟon
$ 60,324.43         Sales Tax
$ 63,000.00         Non‐taxable PorƟon

$812,746.43        Total

These
numbers were confirmed by Purchasing also.

Could you please prepare a staff report for the Council meeƟng on 12/6/23 for award? Please let me know if you have any quesƟons.

Thank you.

Luke

← All documents from this meeting