DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892 AMENDMENT NO. 4 TO
AGREEMENT BETWEEN T.Y.LIN INTERNATIONAL
AND THE CITY OF MENIFEE FOR CIP 13-03
(HOLLAND ROAD/ I-215 BRIDGE OVERCROSSING PROJECT)

ENVIROMENTAL AND CIVIL ENGINEERING DESIGN SERVICES
This is Amendment No. 4 to that certain AGREEMENT for Professional Services greement (Agreement) made on April 16, 2014 between the City of Menifee ("City") an .Y.LIN INTERNATIONAL ("Consultant") for CIP 13-03 (HOLLAND ROAD/ I-215 BRIDGI

OVERCROSSING PROJECT) ENVIROMENTAL AND CIVIL ENGINEERING DESIGN SERVICES which Amendment No. 4 is made and entered into on September 1 , 2021 to increase the scope of work and compensation amount as indicated below:

1. Section 1.6, "Covid-19 Safety" is included to read as follows:

Covid-19 Safety. If Consultant enters City property or meets in person with City employees during the performance of the Services, Consultant shall comply with all State, County, and local emergency orders, directives, protocols, and best practices related to the COVID-19 pandemic, including, but not limited to: (A) wearing facial coverings, (B) maintaining adequate physical distancing when possible, (C) regular hand washing, and (D) regular hand sanitizing.

2. Section 2, "Compensation" is amended to increase the maximum compensation by $280,928.00 (TWO HUNDRED EIGHTY THOUSAND NINE HUNDRED TWENTY EIGHT DOLLARS AND ZERO CENTS), and is amended to read as follows:

Section 2. COMPENSATION.

City hereby agrees to pay Consultant a sum not to exceed $2,419,118.00 (TWO MILLION

FOUR HUNDRED NINETEEN THOUSAND ONE HUNDRED EIGHTEEN DOLLARS AND ZERO CENTS) notwithstanding any contrary indications that may be contained in Consultant's proposal, for services to be performed and reimbursable costs incurred under this Agreement. In the event of a conflict between this Agreement and Exhibit A, regarding the amount of compensation, this Agreement shall prevail. City shall pay Consultant for services rendered pursuant to this Agreement at the time and in the manner set forth herein. The payments specified below shall be the only payments from City to Consultant for services rendered pursuant to this Agreement. Consultant shall submit all invoices to City in the manner specified herein. Except as specifically authorized in advance by City, Consultant shall not bill City for duplicate services performed by more than one person.

3. Section 3. Exhibit A, Scope of Services is supplemented to include Amendment No. 1 Scope of Work Additional Work, which supplement is attached as Exhibit A hereto. "Amendment No. 1 Scope of Work Additional Work (Amendment No. 1)" is not intended to replace the original Exhibit A to the Agreement, but instead to augment and increase the scope of work listed in the original Exhibit A to the Agreement.

4. All other terms and conditions of the Agreement remain in full force and effect.

DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892 CITY OF MENIFEE T.Y.LIN INTERNATIONAL
•DocuSigned by: - DocuSigned by:

Omfph
Armandon. Villa, City Manager Jim Rocker, Vice President -DocuSigned by:

7. R. Clark Fernon
Attest:
3028208:
lark Fernon. Vice Presiden
- DocuSigned by:

Sarale A. Manwaring
Sarah A Manwaring, City Clerk
Approved as to Form:
•DocuSigned by:

Jeffrey t. Melching, City Attorney
Jeffrey T. Melching, City Attorney
Professional Services Amendment No. 4 with T.Y.LIN INTERNATIONAL DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892 Amendment No. 1 - Exhibit A: Scope of Work Additional Work HOLLAND ROAD/I-215 OVERCROSSING

SCOPE OF WORK
Amendment 4
The Holland Road / 1-215 Overcrossing project needs additional engineering design work to address extensive comments 2 Priet Management

3. Structural

4. Right of Way

5. Environmental

6. Survey and Landscape Architecture
PART 1 - PROJECT MANAGEMENT
TYLI will provide overall execution and financial management of the design team, coordinate with the City and Caltrans District 8 (Caltrans), track the progress of the design work, prepare monthly invoices with progress reports, and conduct project development team (PDT) meetings. Subconsultants will prepare monthly invoices with progress reports and track progress of the design work.

1.1 General Coordination and Administration
TYLI's Project Manager will provide management, coordination, and supervision of the design team to complete the additional scope of the work.

Deliverables:
• Coordination with PDT
• Project Schedule
• Monthly Invoices
• Progress Report

1.2 Meetings
TYLI will conduct additional meetings for project development to complete the PS&E phase of the project in coordination with Caltrans and impacted utility agencies to prepare exceptions and agreements. A maximum of six (6) additional PDT meetings are included, and three (3) design development teleconferences for a total of nine (9) meetings.

DEA will attend 4 project meetings with TYLI.

Deliverables:
• Meeting Agendas
• Meeting Minutes
PART 2 -CIVIL ENGINEERING
Prepare technical studies and analysis and revise the PEER In the latest prescribed format for City and Caltrans review and approval. Specific activities will be as follows:

2.1 Civil Engineering- Stormwater
Based on discussions with the City, the water resources design will need to be updated to coordinate with separate private developments located on each side of the freeway. To the east, the Del Ora North developer will now move forward with the final design of their development located at the northeast corner of Holland Road and Hanover Lane concurrently with this project.
he Del Oro North development proposes a drainage system (trapezoidal earthen channel) which conveys runoff to thi ortheastern corner of their parcel to connect to an existing offsite earthen ditch downstream. This change impacts the ! DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892 215/Holland Ave Overcrossing project in eliminating the proposed regional infiltration basin located at the downstream limit of the project site, at the northeastern corner of Holland Road and Hanover Road. As a result, water quality treatment for the project will need to be addressed upstream of the discharge point resulting in several design changes. These include:
• Resubmittal of the 95% design documents
• Resubmittal of the Transportation Guidance Report (water quality) • Resubmittal of the On-site Drainage Report
• Resubmittal of Drainage plans
• Preparation of the 100% PS&E design.

2.8 Hydrology & Hydraulics Report
TYLI will revise the Hydrology and Hydraulics (H&H) Report (Onsite Volume II) and submit to the City of Menifee for review at the 95% Design re-submittal. The revision will address the review comments on the plans from the City of Menifee and the design changes associated with the stormwater quality treatment.

Since the prior H&H report prepared in 2016 was approved by Caltrans, it is assumed that an additional detailed review will not be required by Caltrans. However, changes to the on-site storm drain flow routing will affect the post-project condition peak flow rate at the Caltrans right-of-way, which will require another Caltrans review. To streamline this review, a separate altrans H&H Memo will be prepared with a summary of the key findings from the full H&H Report. This memo will include 1 brief narrative and a comparison of the pre- and post-project discharge rate into Caltrans right-of-way. The memo will include supporting drainage exhibits.

It is assumed that both the H&H Report Onsite (Volume II) and Caltrans H&H Memo will be approved at the 100% Design Submittal.

Deliverables:
• 95% Design (Re-submittal)
• Responses to 2017 95% design comments from the City of Menifee Revised Hydrology & Hydraulics Report (On-site) Volume II (95% Design Re-submittal) Caltrans Hydrology and Hydraulics Memo (95% Design Re-submittal • 100% Design
Responses to 95% design comments from the City of Menifee Responses to 95% design comments from the Caltrans
Revised Hydrology & Hydraulics Report (On-site) Volume II (100% Design) Revised Caltrans Hydrology and Hydraulics Memo (100% Design)

2.8.1 Transportation Project Guidance (TPG)
TYLI will revise the Transportation Guidance Report (TPG) and submit to the City of Menifee for review. The TPG report will address the stormwater requirements for areas within the City of Menifee, which are subject to the Santa Ana Regional Water Quality Control Board (RWQCB) issued Permit Order No. R8-2010-0033 ("MS4 Permit"). It should be noted that this is a separate water quality report from the Short-Form Stormwater Data Report which was prepared for Caltrans under a separate MS4 Permit.

The report will revise the water quality treatment approach on the east side of the overcrossing into a distributed treatment approach at each inlet (e.g., compact biofiltration BMP) for up to four (4) inlet locations for newer requirements to stormwater quality standards. Assume infiltration type BMPs will not be feasible at the inlets due to the proximity to the street and utilities.

To address the water quality treatment to the "maximum extent practicable" on the west side of the project, it is anticipated that inlets/storm drain design will be adjusted to collect and convey more proposed impervious surfaces into biofiltration basin near the same location of the bioswale previously proposed. Revise specifications to latest standards.

This scope includes one revision for the 95% Design re-submittal and one revision for the 100% Design Submittal..

Professional Services Amendment No. 4 with T.Y.LIN INTERNATIONAL DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892 Deliverables:
• Revised 95% Transportation Project Guidance Report (95% Design re-submittal) • Responses to 95% design comments
• Final Transportation Project Guidance Report (100% Design)

2.12 Environmental Documents

2.12.2 Permits, Agreements
The scope involves work related to continuing and completing permits by ICF due to design revisions included in amendment 4.

Permitting Staff, as well as project management and meeting attendance. Please note the following:

The project's CDFW Operation law expires July 20. 2022. If th ted proe submited tote on la. me as ciated with r the proace is noticited by thended evap feepion ide • Once issued, the USACE 404 NWP will expire on March 18, 2022. If the project is in progress or under contract by then, the USACE may allow an additional year for the project to be covered under the existing NWP program (as has been done in the past). If the project is not in progress or under contract by March 18, 2022 or the USACE doesn't allow an additional year, then a new application will need to be submitted to the USACE based on the regulations in place at that time. Time associated with preparing a new application is not included in the fee provided. • Once issued, the RWQCB 401 Certification will likely remain valld until the USACE 2017 NWPs expire on March 18, 2022, or through an extended period beyond the expiration date that is authorized in writing by the USACE. If the project is not completed by then or an extension is not granted, a new application will need to be submitted to the RWQCB based on the regulations in place at that time. Time associated with preparing a new application is not included in the fee provided. • The hours reflected in the fee table do not include tasks to demonstrate compliance with the aquatic resource permits.

RWQCB compliance is included in the TYLI stormwater scope. • Any fees associated with the permits, including application fees, are not included and assumed to be paid directly by the • This scope and fee does not include preparation of an Environmental Re-Evaluation.

PART 3 -CIVIL ENGINEERING- PLANS, SPECIFICATIONS, AND ESTIMATES

3.1 Survey and Topographic Mapping
The following Survey and Mapping tasks will be provided for the preparation of legal descriptions for the proposed Abutment 4 on the Interstate 215/ Holland Road project in the city of Menifee, County of Riverside.

Control Surveys
Horizontal and Vertical contral previously set by DEA will be recovered and verified prior to using the control for this task amendment. Due to the length of time that has passed since our last site visit, it may be necessary to set new surve control. Any new survey control will be tied to existing Caltrans and DEA contro Right Of Way Coordination
egal Descriptions and Plats: Legal description and plat map will be prepared for the proposed location of Abutment 4. Th gal descriptions and plats will be based upon the bridge layout plans provided by TYLIN. It is assumed that only one leg and plat will be needed for this task so only one set will be prepared. The legal description will be prepared by or under the direction and signed by a California licensed land survevor.

Deliverables:
• Hard Copy (and pdf) - Signed Legal Descriptions / Plats Professional Services Amendment No. 4 with T.Y.LIN INTERNATIONAL DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892

3.3 Utility Coordination

3.3.1 Utility Coordination
• This task includes coordination with identified utility owners. TYLI will update utility owners contact information and send updated Verification Letter To Owner (VLO) notices to the following utility owners:

1. AT&T

2. Eastern Municipal Water District (EMWD)

3. MediaCom Communication Group

4. Southern California Edison (SCE)

5. Southern California Gas

6. Time Warner Cable

7. Verizon Communications
TYLI will review previously obtained utility as-built records and pothole information for consistency with 100% design plans. It is assumed all utility as-built records and pothole information has been collected and no additional information will be obtained.

3.3.2 Longitudinal Encroachment Exception Coordination
A Longitudinal Encroachment Exception request has been submitted to Caltrans for the overhead electrical and communication utilities within access-controlled freeway right of way. TYLI will coordinate the review and approval of the request with Caltrans and the utility owners. If the request is approved, Caltrans will grant a Longitudinal Encroachment

3.3.3 Southern California Edison Coordination
Southern California Edison (SCE) will design relocations for their facilities. TYLI will review utility relocation design drawings developed by SCE. TYLI will provide design review comments including associated clearing, grubbing, and grading design elements. Design review will compare existing surface features, utility relocation designs and final design improvements for the Paloma Wash realignment.

3.3.4 Irrigation Water Supply Coordination
This task includes coordination with David Evans and Associates (DEA) to re-design of the irrigation water supply. DEA will re-design the irrigation system, including water supply service connections, meters, control valves and associated improvements to remove systems conflicting with required changes for this amendment. The irrigation system will be supplied by a potable water source, but coordinated with EMWD based on the latest recycled water candidacy (2016 vs 2021. DEA will coordinate the recycled water candidacy and TYLI will assist DEA with the request. TYLI will review DEA's irrigation design and provide review comments and coordination for the revised irrigation meters and updates to the design drawings and specifications.

Deliverables:
• (7) Seven updated Verification Letter to Owner (VOL)
• (1) One updated Longitudinal Encroachment Exception Request package • (1) One set of design review comments to SCE utility relocation design drawings • (1) One set of design review comments to DEA irrigation design

3.7 Civil (Roadway) Engineering

3.7.2 95% PS&E Re-submittal

3.7.2.1 Stormwater Drainage
Professional Services Amendment No. 4 with T.Y.LIN INTERNATIONAL DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892 TYLI will address City of Menifee's comments and incorporate the design changes described previously into the revised plans, specifications, and estimate.
• Revise Drainage Plans, Profiles, Details, and Quantities • TYLI will revise the plans, profiles, details, and quantities sheets; and revise the specifications and estimate for the 95% design re-submittal to latest Caltrans detalls, specifications and regional water quality standards.

Deliverables:
• 95% Roadway PS&E (Drainage)

3.7.2.2 Sanitary Sewer PS&E
Provide sanitary sewer plans and details to show the extension of existing public sewer system along Holland Road to the Cul-De-Sac where it terminates. The sewer will begin at the existing 8-inch stub in Holland Road, east of Haun Road, and travel east to the end of the cul-de-sac. The sanitary sewer improvements include approximately 750 LF of new gravity wer mains and (2) two new sewer laterals to adjacent properties along the cul-de-sac. Sanitary sewer improvements n : designed in accordance with EMWD design standards. TYLI will coordinate design reviews with EMWD at the 60%, 90 100% design levels.
anitary sewer improvements will be submitted at the 60%, 90%, and 100% design levels for review by EMWD and the City concurrently. TYLI will update the plans based on 60%, 90%, and 100% review comments received from both EMWD and the City.

Sanitary sewer improvements will be designed based on 8-inch pipe sizing. Sewer system sizing calculations are not anticipated and therefore not included in this scope of work.

Sanitary sewer improvements will be located within existing easements or within public right of way.

Sanitary sewer plans and details will include the proposed improvements:

Title Sheet (1 sheet)
• Plan and Profile (2 sheets)
• Details (1 sheet)
• Technical Specifications/Special Provisions
• Quantities and Cost Estimates
Deliverables:
• 60% Sewer PS&E
• 90% Sewer PS&E

3.7.2.3 Landscape Architecture (95%, 2nd Review)
• Revisions to planting and irrigation on the north side of Holland Road (east and west sides of the 215) and north MSE wall due to changed right of way constraints, quantity modifications, pipe and valve changes and new calcs for pressure loss and MWELO.
• Coordination and design for revised stormwater designs modular wetlands and / or Filterra treatment in 5 locations - includes planting and irrigation at each location. * Revise planting and irrigation for biofiltration on south side of Holland Rd., west of 1-215 and replace with added DG path for SCE access (south side of Holland Rd., west of 1-215, adjusted planting / irrigation. • General coordination, file access, update base sheets. • 2018 Project specifications / confirm City format (irrigation specs vary as City prefers their std, equipment). • Perform EMWD Recycled Water coordination for changes to EMWD recycled water objectives. • Attend 4 virtual team meetings and 2 virtual PDT meetings.

Professional Services Amendment No. 4 with T.Y.LIN INTERNATIONAL DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892 Deliverables:
95% Revised Landscape and Irrigation PS&E (12 sheets)

3.7.3 100% PS&E Submittal (Drainage and Sewer Items)
TYLI will address City of Menifee's comments and incorporate the design changes described previously into the revised plans, specifications, and estimate.
• Revise Drainage, Landscape, and Sewer Plans, Profiles, Details, and Quantities • TYLI will finalize the plans, profiles, details, and quantities sheets; and finalize the specifications and estimate for the 100% design submittal. It is assumed that the plans will be approved at this submittal.

Deliverables:
• 100% Roadway PS&E (Drainage)
• 100% Roadway PS&E (Sewer)
• 100% Roadway PS&E (Landscape Architecture)
Exclusions:
• Preparation of the SWPPP is not included in this scope of work. It is assumed that the contractor selected by the City of Menifee will be responsible.

Revisions to the Caltrans Stormwater Data Report (SWDR) - the Short-Form Stormwater Data Report submitted trans in 2016 is acceptable and revisions will not be requir • Southern alone rate a reline re enial eatent on the west it rhe reis not design for the Old Paloma Wash realignment.
• Revisions to 95% first submittal plans are included in the original contract for items other than scoped in this amendment.

3.8 Structural PS&E (Bridge and Retaining Walls)
95% PS&E Submittal (Structural, 2nd Review)
Coordinate with Geotechnical subconsultant EMI to determine project criteria for Class S1 of 52 soil design criteria per new Caltrans Seismic Design Criteria (SDC 2.0).

Update calculations to revise abutment for revisions to the Caltrans Seismic Design Criteria (SDC) and determine abutmen stiffnesses- see SDC Section 6.3.1.2. A re-analysis of abutment stiffness will be performed but will not significantly affect the outcome of the model.

The revised SDC Section 6.3.4 - shear key force demand equations have been changed and will require re-analysis. cording to SDC Section 3.5, displacement capacity shall be determined through an Inelastic Static Analysis and th evious version SDC equations in the existing 95% analysis to calculate displacement capacity no longer apply. Revi calculations for displacement capacities.

New seismic detailing requirements will require revisions to plans. Revise MSE wall pians to include extended fencing to enhance residential privacy. Revise plans to include similar fencing to the bridge.

Respond to City and Caltrans comments, and revise plans for 100% Final PS&E.

Deliverables:
• 95% Plans, Specifications, Estimates, and Calculations 2d Review Submittal; Bridge and MSE walls Professional Services Amendment No. 4 with T.Y.LIN INTERNATIONAL DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892

3.8.5 100% PS&E Submittal (Structurall
Respond to comments from 95% PS&E Submittal, 2^d Review and revise submittal to include changes, update quantities and cost estimates.

Deliverables:
• 100% Final Plans, Specifications, Estimates, and Calculations Submittal; Bridge and MSE walls PART 4 -RIGHT OF WAY (OPC)
The additional R/W services we have identified are for parcel 360-230-008, to include the re-appraisal and support services associated with the ongoing negotiations. Other R/W services include; Bridge Abutment 4 R/W transfer to Caltrans, past out-of-scope services rendered associated with APN 364-070-048, 360-230-007 partial reconveyance bank and lender, and Project Team meetings and attorney coordination for 360-230-008.

4.1 ROW Project Management and Document Support

1. Project support to facilitate negotiations, policy, and budget analysis.

Two (2) monthly one (1) hour meetings via video conference. Our scope does not include travel to in-house client torney meetings. Participation in informational meetings with escrow, City attorney, and all other City offic representatives.

3. Tracking and managing all budgetary-related aspects of the project associated with OPC's Scope of Work.

4. Assisting with the development of administrative policies, procedures, and forms necessary to carry out the initial program.

6. Ongoing general consultation and project coordination with the client and project team members.

7. Coordination of documentation for client meetings and assistance to the City's legal team.

8. Preparation of tracking reports that monitor the completion of project milestones of the various disciplines involved on the project.

9. Preparation and presentation of a monthly status report based on the agreed-upon guidelines on information to be provided. Confer with client verbally on general status, problem areas, and progress.

10. Coordinate with federal and state oversight agencies such as Caltrans, County, City and state agencies.

11. Subcontracting for and managing any necessary disciplines needed for one (1) parcel remaining on this project.

4.2 Title Investigation Services
OPC will ordered and reviewed updated title work through Commonwealth Land Title to make sure there are no new encumbrances that cannot be removed administratively by the title company and any new items that cannot be removed by the title company to receive clear title (APN 360-230-008).

Opening retirow and a reply i le sue a lose otes, proceeding with escrow, the PT will be updated the

2. Secure copies of recorded back-up documents as needed.

3. Share preliminary title information with right of way engineer, surveyor, and real estate appraisers for their use on the project.

4. Prepare list of title exceptions to be cleared; confirm manner of disposition is consistent with approved project plan.

5. Secure vesting deeds, property profile, and tax map for the property.

6. Provide escrow coordination in support of any partial reconveyance.

Professional Services Amendment No. 4 with T.Y.LIN INTERNATIONAL DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892

4.3 Appraisal and Re-appraisal Services

1. OPC is to mail a notification letter and acquisition policies brochure to the property owner of APN 360-230-008 requesting permission to conduct an on-site inspection of the property, advising them of their right to accompany the appraiser at the time of the inspection and requesting information regarding the property appraised which could influence the appraised value.

2. Appraiser will review title information pertaining to respective ownerships and will review drawings and other pertinent information relative to the parcel.

3. Appraiser will inspect each property personally with the owner (if possible) and document the inspection with photographs for use in the report unless a new inspection is not deemed to be necessary by the appraiser.

4. Appraiser will inventory all improvements affected by the proposed taking including notes on their manner of disposition (i.e., pay-for and remove vs. move back).

S. Appraiser will perform market research to support the selected appraisal methodologies and will document and confirm comparable sales information.

6. Appraiser will prepare a narrative appraisal report that conforms to the Uniform Standards of Professional Appraisal Practice (USPAP). The appraisal study and report are intended to serve as an acquisition appraisal and will be prepared in a summary format consistent with the specifications for narrative appraisal reports.

7. OPC will receive and analyze the completed appraisal reports and will reconcile the real estate and fixtures and equipment conclusions, as necessary.

8. Appraisal review work will be performed under the requirements of the USPAP and the Code of Ethics of the Appraisal Institute.

9. Gather relevant data regarding the appraisal review assignment, such as project plans. Read the appraisal report under review thoroughly. Gather any outside information necessary to complete the review process.

10. In the case of a field review, conduct an inspection of the property and comparable data used in the appraisal assignment. Collect any pertinent backup data that may shed light on the market data used. Check the appraisal report for mathematical correctness.

11. Conduct a review of the appropriateness of the methodology, the accuracy of the data and the application of the approaches to value used in the appraisal. Make reference to the correct edition of the Uniform Standards of Professional Appraisal Practice (USPAP) and the Caltrans Right of Way Manual, as applicable.

12. Interface with the real property appraiser regarding any concerns and/or request corrections that may be necessary to insure report compliance.

13. Complete the appraisal review report and review certificate. Proofread and check for mathematical correctness.

Administrative staff generates report copies and transmits them to client.

14. Additional days may be necessary for complex assignments involving severance damages and/ or unique property types.

Delivery timing is highly dependent on a quick turnaround for any comments to the appraiser, with 48 hours anticipated in the above schedule.

4.4 Acquisition Services and Project Close-Out
OPC is a State of California Corporate Real Estate Broker. All OPC acquisition agents are licensed California brokers or salespersons. OPC will perform all work that is necessary or advisable in a manner that adheres to all professional standards and ethics, and all applicable laws and regulations including the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (Uniform Act or URA) or Title 25, California Code of Regulations, and its amendments. We have an exceptional working knowledge of Title 49 Code of Federal Regulations (CR) Part 24, State of California eminent domain law, and Caltrans Right of Way Manual Acquisition guidelines.

For acquisition activities, OPC's agents will perform the following services.

1. Establish and maintain complete and current ownership files in a form acceptable to the client.

Professional Services Amendment No. 4 with T.Y.LIN INTERNATIONAL DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892

2. Receive and analyze title information, approved appraisal reports, and legal descriptions in sufficient detail to negotiate with property owners and other parties.

3. Prepare all offer letters, summary statements, and lists of compensable items of fixtures and equipment, in accordance with state or federal regulations and approval of client.

4. Present written purchase offers to owners or their representatives in person, when possible. Secure receipt of delivery of offer as practical and present and secure tenant information statements, as applicable.

5. Notify relocation agent of initiation of negotiations within two (2) business days and provide appraisal information, occupant contact information, and tenant information, as necessary.

6. Follow-up and negotiate with each property owner, as necessary; prepare and submit recommended settlement justifications to client for review and approval; review any independent appraisal secured by property owner; and ordinate reimbursement of appraisal fees (up to $5,000) with client. Ongoing negotiations and settlement discussions v ntinue for a period determined by the Client after the initial offer (eight (8) weeks is recommended) or if settlement impasse is reached sooner.

I repay and semble lein erics do and anted aces on documen are are on dea are not. included in this Scope of Work.
• Maintain a diary report of all contacts made with property owners or representatives and a summary of the status o egotiations indicating attitude of owners, problem areas, and other pertinent information. Copies of all applicable writter correspondence will be maintained in files.

9. Prepare an impasse letter for any parcel where, after diligent attempts to settle by negotiation, it appears eminent domain will be needed or prudent to acquire the needed interest.

10. Transmit executed acquisition documents to client. Each transmittal package shall include a fully executed and properly notarized deed(s), fully executed acquisition contract with attachments and a brief settlement memorandum which summarizes the pertinent data relative to the transaction.

Assumption: Tenant Interest is not required and that no Personal Property Relocation is needed on this parcel.

Project Close-out Activities
PC will provide close-out activities that encompass the transfer of land rights. Caltrans related activities will be compliar ith City of Menifee and Caltrans District 8 requirements if applicable. This will include documentation for each projec parcel, respectively, upon the completion of Right of Way Certification.

1. Title Reports (Guarantees) identifying parcels to provide updates and insurance for title conveyance.

2. Preparation of deed jackets.

3. Coordination of approvals from local Agency and attorney representatives.

4. Preparation of legal description and plats.

5. File close-out and files delivered to the City of Menifee.

Professional Services Amendment No. 4 with T.Y.LIN INTERNATIONAL DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892 Cost Proposal Worksheet
COMPANY: SCOPE OF WORK: DATE
T.Y LIN INTERNATIONAL PSEE AN CONSTRUCTION SUPPORT 8/5/2021 PRULECT:

Holland I-215 Amendment 4

DIRECT LABOR
PERSONNEL FUNCTION HoURs RATE AMOUNT
Jim Rucker Principal in Charge 2.0 $ 280.00 S 560,00
Robert Barton Projed Manager 82.0 230.00 S 14.260.00
Roya Golchooblan CA/QC Manager 20 280.00 S 560.00
Nardin Metwashla Senior Structural 1 40.0 200.00 S 8.000.00 Dina Tobia Senior Structural 1-QC 32.0 200.00 S 6,400.00 David Mancini Structural CADD 54.0 145.00 S 7,830.00
Greg Campbell Principal, Civil 8.0 26000 S 2,080.00
David Holman Lead Utility Engineer 40.0 260.00 10.400.00 Phillip Brand Senior Utilty Engineer 1 53.0 200.00 10,600.00 Katherine Baker Senior Utilty Engineer 1- QC 18.0 200.00 S 3,600.00 Javier Lopez Utility Engineer 1 285.0 110.00 S 31,350.00 Michael Bruning Drainage Discipline Lead 26.0 280.00 S 6.760.00 Sharon Lumbreras Senior Drainage Engineer 1 152.0 200.00 S 30.400.00 Megan Blancel Drainage Engineer 2 212.0 135.00 S 28,620.00 Stacey Bracco Accounting 30.0 120.00 S 3.500.00
TOTAL HOURS 1,016.0 TOTAL DIRECT LABOR E 165,020

OTHER DIRECT EXPENSES

ITEM UNIT QUANTITY UNIT COST AMOUNT
Reproduction LS
Copying LS
Transportation/Travel LS 470.00 470.00
Special Deliveries LS
LS
TOTAL OTHER DIRECT EXPENSESS 470

OUTSIDE SERVICES

COMPANY FUNCTION TOTAL
OPC Right of Way $ 25,585.00
DEA Survey and Landscape Architecture 46,768.00
ICF Environmental $ 43,085.41
TOTAL OUTSIDE SERVICES E 115,438
TOTAL COSTS 280,928
Professional Services Amendment No. 4 with T.Y.LIN INTERNATIONAL

CITY OF MENIFEE
HOLLAND ROAD/I-216 BRIDGE OVERCROSSING

COST PROPOSAL
AMENDMENT 4
0/5/2021
DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892 Loaded Retes
TOTALS
FrAT Senor

TASK ACTINTY PIC

ROJECT AMMI CEMENT
emeral Carénesen ED1I
Professional Services Amendment No. 4 with T.Y.LIN INTERNATIONAL BOI 420 reen Margemen Plan

MEAL OUT LEND EVALUATON REPORT PEERS, AND
3100 37 140 00
2121 Pafere Enviratistest Gradies and Prepare Orelt Enviterinetal Decun at Casarky Ovinas Supper
then ends and Lested Content Pa BeA

PLANS SPECPICATIONS A ESTIMATES (MAR)
ros and Tenegretle Mapping
25 Сенн
20 100 60
W Engineerng and Cordanian
transportaden Manages at Plans (ThE Faer
4332050
400 27,900.00
182 Tipe Salacad
138 100% SINAT P54E S40m TEll

DUHT OF WATACOUSITON
tate a was Print Management and Dessert Supper
* hot bestige ferdin

ECNSTRRUCTION ENGENEERONO SUPPORT
O4 Sen
TATA
TO 200 2 00 00 540 0 00 630 100300 165.430.00

CITY OF MENIFEE
HOLLAND ROAD/I-215 BRIDGE OVERCROSSING

COST PROPOSAL
AMENDMENT 4
DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892 CC HANTO WAT WHEANT 2
Landed Rator
TOTALS]
- Yo0an
Profesional Services Amendment No. 4 with T.Y.LIN INTERNATIONAL TASK ACTIVITY Toni Mour

10. tE zoi Mesene Pin

OO AGATAL OIE O NORERNO FYA LATON EFORE PREO, AND
:
a tnew trede RedOCIN)
M WWW OHI D4
dess ta Denge Sonants
Braneg ty trule Anys Rene.

Pees Water Data Raper (ONCO - PASEO LeVe

2.12.1 Perform Enveonenental Studies and Prepare Draft Eeveroßeental Cacument 2122 P emine. Agrees ente. and Route Adeptan Outa PARED 2 123 Circu/ale Draft Envirenmentd Decuns ent
.12 4 Pre we ma Aseraye Prelet Reun ind Fal Tawugewa Oreveen1E0 Commuaky Outalch Suesor

EL AARONE WALBUR CHLAL PINA DEAT

PLANS SPECK ICATIONS BESTRATES PHAE)
veg and Tepsapphi sppig
Coén m mAPuing
FW Enpinelng and Cearenason
m KrwO RAMIRE PIELAS
121% endea Pold Cabata
11313aSeazAs
21300% Sevo/u PSaR Sua tal!
I1% Setl PIAf Suln ital

MONT OF WAY ACOLRATION
150 120
Ascaea ane Spatiate Apssisal Serdens
B01 w0t 13.885.00
"eterem Costdsades
1 Earl Ryft&/Nin CenteMar Curigs
CONSTRUCTIÓN ENCORERNO SUPPORT
Eo Contrites Saper
7500.00
TOTALS L L 130 0 5 25 585.00
Construsten Spen
CONSTRUCTION ENGENERSONO SUPPORT 10
as and foolaty Appraisal Services

DONT OF WATAGOUESITION
218130% Sour P124 Sun mu
28307% Sustural PSEE Som tall
211 Bidge Sis Das Suba lil
siture F3aE (Chage and Recanng Wate)
222100% Rusten P344 Subee
2e Ernestaten Mats genes Poes (T12) Raen
See Wate Cans Repent (SMDRQ • PLA Loved
2w Engineding and Colnes
3E Cade Engineering
21 Burveys and Teepank Maply
"LANE SPECIATIONS & ES TAM TES (MAE
2-124 Prepare bed Sapreverelese Rapart and Fall Endean set Decum ant 0201 2121 Before Eevrenneta Sude and Prupare Craft Exabeandal Detone as can Water Data Repent (WOR) - PAMD Coul
Mote Manages it Pas (TAP)
100/0/00/0000000
et Resent Cointie (RE)
WIRONMENTAL DOCUMENT EDI :

AQUECT REFORT (FREL, PERMIT EVALICA EVALICATION REPORT PEERI, ANO 20 201
5500.00 40 20.0
TASK ACTARY Professional Services Amendment No. 4 with T.Y.LIN INTERNATIONAL TOTALS
Loaded Rates
0520211 WHIMITA
DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892 AMENDMENT 4

COST PROPOSAL
HOLLAND ROAD/I-215 BRIDGE OVERCROSSING

CITY OF MENIFEE

CITY OF MENIFEE
HOLLAND ROAD/I-215 BRIDGE OVERCROSSING

COST PROPOSAL
AMENDMENT 4

PRONENT
Lose Rain gaE DocuSign Envelope ID: 3F87559E-C179-4EE0-B37B-8904B6B7E892 010E 102E TOTALS
Ho tack TASK ACTINITY

PROVEST LANAGEMENT
120 800E 401
Professional Services Amendment No. 4 with T.Y.LIN INTERNATIONAL Великамии

ROVECT REPORT (PRE) PERMIT ENO NEERNO REPORI REPORT (HER), AND RONMENTAL Prent Foot Centen The
sets of tay Deta Stan
setter Manages ve Plan TAP
WARMAN ONe

2.12.1 Telena Cadest Shades and Trapse On Thessa stal Orient 130001
= RAN. SPECTISATIONS & ESTATES ONE
My CANNONE AN PARMA
38307% Suiteral PS4t Sunmal
Mum dan par tale
32500% Seatre 1534 344200
385107% Iota PA SeE

GHT GE WAY ACOUSIDON
40 t efe Pet Mes вой Диния на берны

CONETRUCTION ENGIMECRUNO SUNPORT
TOTALL 330 320 300 30 1050 43085411