PARCEL MAP OR TRACT MAP NO. DATE:

IP:

IMPROVEMENTS
Street/Drainage $ 923,034.88 $ $
*Flood Control $ 0.00 $ $
Dom Wtr EMWD $ 256,334.40 $ $
Rec Wtr EMWD $ 0.00 $ $
Sewer EMWD $ 131,774.40 $ $
Total 1,311,143.68 $ $
Warranty Retention (10%) $
Construction items and their quantities, as shown on the attached sheets, are accurate for the improvements required to construct the above project and the mathmatical extensions, using City's unit costs, are accurate for determining bonding costs
Above amounts do G do not G include additional 20% for recordation prior to having signed plans (Ordinance460, Section 10.3E).
10/15/2024
Signature Date
83363 3/31/2025
Name Typed or printed RCE# Exp. Date
Civil Engineer's Stamp
*Flood Control Construction Cost Estimate to be provided by Flood Control District. Provide a copy of Flood Control District letter stating cost estmate.

1. Quantities are to be taken from the Improvement Plans. Unit cost are to be as provided on "City of Menifee Improvement Requirement Worksheet."

2. Show Performance Bond Amounts to the nearest $500.00. Material and Labor Bond Amounts are 50% of Performance Bond Amountss. **100% for Flood Control items.

3. For Construction items not covered by "The City of Menifee Improvement Requirements Worksheet", Design Engineer is to provide his opinion of construction cost and use that cost. If City of Menifee Unit Costs are determined to be too low, in the opinion of the design engineer, the higher costs as provided by the Design Engineer should be used.
1,311,500.00 655,750.00
131,150.00

DESIGN ENGINEER'S CALCULATION OF IMPROVEMENT BONDING COSTS *** PLEASE READ INSTRUCTIONS BELOW ***
Michael Brendecke
256,500.00 128,250.00

0.00 0.00
132,000.00 66,000.00
Construction Costs) Construction Costs)
923,000.00 461,500.00

0.00 0.00

FAITHFUL PERFORMANCE MATERIAL & LABOR

SECURITY SECURITY
(100% of Estimated (**50% of Estimated
17-065S

CITY OF MENIFEE ENGINEERING DEPARTMENT

CONSTRUCTION COST WORKSHEET
TR 36658-4 10/15/2024
Approved for
bonding
10/16/24
A. Backlund

CITY OF MENIFEE ENGINEERING DEPARTMENT

IMPROVEMENT REQUIREMENT WORKSHEET

STREET AND DRAINAGE IMPROVEMENTS

UNIT
ROADWAY SECTION 1 Area = S.F.

Excavation
Cut (c) = C.Y.

Road area and side slopes to daylightFill (f) = C.Y.

C.Y. $ 0.40 $ 0.00
C.Y. $ 1.10 $ 0.00
C.Y. $ 2.80 $ 0.00
TON $ 90.00 $ 201,690.00
Thickness in Feet (0.33' min.) =
C.Y. $ 50.00 $ 87,350.00
Thickness in Feet =
Ton $ 600.00 $ 0.00
ROADWAY SECTION 2 Area = S.F.

Excavation

2. Projects without a Grading Plan: Cut (c) = C.Y.

Road area and side slopes to daylight Fill (f) = C.Y.

C.Y. $ 0.40 $ 0.00
C.Y. $ 1.10 $ 0.00
C.Y. $ 2.80 $ 0.00
TON $ 90.00 $ 0.00
Thickness in Feet (0.33' min.) =
C.Y. $ 50.00 $ 0.00
Thickness in Feet =
Ton $ 600.00 $ 0.00
ROADWAY SECTION 3 Area = S.F.

Excavation

2. Projects without a Grading Plan: Cut (c) = C.Y.

Fill (f) = C.Y.

C.Y. $ 0.40 $ 0.00
C.Y. $ 1.10 $ 0.00
C.Y. $ 2.80 $ 0.00(c.) Import and Fill -
(a.) Excavate and Fill -
(b.) Excavate and Export -
C.Y. $ 25.00 $ 0.00 Area x 0.50' (hinge point to hinge point)

0.5 Asphalt Emulsion (Fog Seal/Paint Binder)
(1 ton = 240 gals)
-

1. Projects with Grading Plan for Roadway
(c.) Import and Fill -
Asphalt Concrete (144 lbs/cu.ft) -

0.39 Agg Base Class II -
(a.) Excavate and Fill -
(b.) Excavate and Export -
C.Y. $ 25.00 $ 0.00 Area x 0.50' (hinge point to hinge point)

0.5 Asphalt Emulsion (Fog Seal/Paint Binder)
(1 ton = 240 gals)

1. Projects with Grading Plan for Roadway
Asphalt Concrete (144 lbs/cu.ft) 2,241

0.33 Agg Base Class II 1,747
If balance, provide (a.) only, either cut or fill
If export, provide (a.)&(b.) a = fill, b = cut - fill
If import, provide (a)&(c), a = cut, c = fill - cut
(Unit costs for (a),(b), & (c) are 20% of actual
costs to assure that work will be corrected to
eliminate hazardous conditions.)
(a.) Excavate and Fill -
(b.) Excavate and Export -

2. Projects without a Grading Plan

1. Projects with Grading Plan for Roadway
C.Y. $
(c.) Import and Fill -

ITEM QUANTITY UNIT AMOUNT
COST

25.00 $ 0.00 Area x 0.50' (hinge point to hinge point) TON $ 90.00 $ 0.00
Thickness in Feet (0.33' min.) =
C.Y. $ 50.00 $ 0.00
Thickness in Feet =
Ton $ 600.00 $ 0.00
L.F. $ 1.00 $ 0.00
S.F. $ 0.50 $ 0.00
S.Y. $ 0.60 $ 0.00
S.Y. $ 8.00 $ 0.00
L.F. $ 18.00 $ 0.00
L.F. $ 3.00 $ 0.00
L.F. $ 7.50 $ 0.00
L.F. $ 10.00 $ 0.00
EA. $ 250.00 $ 0.00
S.F. $ 0.90 $ 0.00
L.F. $ 14.00 $ 59,752.00
L.F. $ 16.00 $ 0.00
L.F. $ 12.00 $ 0.00
L.F. $ 10.00 $ 0.00
L.F. $ 15.00 $ 0.00
L.F. $ 8.00 $ 0.00
L.F. $ 10.00 $ 0.00
S.F. $ 10.00 $ 0.00
S.F. $ 6.00 $ 148,500.00
S.F. $ 8.00 $ 110,160.00
S.F. $ 6.00 $ 0.00
EA. $ 1,500.00 $ 0.00
EA. $ 2,500.00 $ 0.00
L.F. $ 100.00 $ 0.00
L.F. $ 35.00 $ 0.00
L.F. $ 10.00 $ 24,100.00
L.F. $ 15.00 $ 0.00
L.F. $ 12.00 $ 0.00
EA. $ 1,000.00 $ 0.00
EA. $ 10,000.00 $ 0.00
EA. $ 5,000.00 $ 60,000.00
EA. $ 150.00 $ 0.00
EA. $ 400.00 $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
Adjust MH to Grade ( if no sewer plan )
Relocate Power Pole
Street Lights (including conduit) 12
Adjust Water Valve to Grade ( if no water plan )
Chain Link Fence ( 6' )
Relocate Fence
Pipe Gate
Barricades
Metal Beam Guard Railing
Utility Trench, one side (Edison, Telephone, Cable)
(total length of Streets) 2,410
P.C.C. Dip Section Std. 307
ADA Access Ramp (w/ new construction)
ADA Access Ramp (in existing improvements)
P.C.C. Cross Gutter and Spandrels
P.C.C. Sidewalk 24,750
P.C.C. Driveway Approach (81 EA.) 13,770
Type "D" Curb
A.C. Dike (6")(incl. material & labor)
A.C. Dike (8")(incl. material & labor)
Curb and Gutter (Type A-8)
Type "C" Curb
Type "D-1" Curb
Relocate Mailbox
AC overlay (min. 0.10')
Curb and Gutter (Type A-6) 4,268
Remove A.C. Dike
Remove Chain Link Fence
Remove Barricade
Grinding A.C. , in place
Remove A.C. Pavement
Remove Curb and Gutter

0.5 Asphalt Emulsion (Fog Seal/Paint Binder)
(1 ton = 240 gals)
-
Sawcut Exist. A.C. Pavement
Cold Plane A.C. Pavement
Asphalt Concrete (144 lbs/cu.ft) -

0.39 Agg Base Class II -
$ $ 0.00
S.F. $ 4.00 $ 0.00
S.F. $ 10.00 $ 0.00
EA $ 100.00 $ 0.00
S.F. $ 3.50 $ 0.00
C.Y. $ 27.00 $ 0.00
EA $ 7,000.00 $ 0.00
S.F. $ 10,000.00 $ 0.00
EA $ 3,000.00 $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
EA. $ 200.00 $ 0.00
EA. $ 300.00 $ 0.00
C.Y. $ 400.00 $ 0.00
EA. $ 500.00 $ 0.00
EA $ 2,000.00 $ 0.00
EA $ 2,000.00 $ 0.00
EA $ 2,000.00 $ 0.00
S.F. $ 6.50 $ 0.00
S.F. $ 6.50 $ 0.00
C.Y. $ 400.00 $ 0.00
C.Y. $ 200.00 $ 0.00
C.Y. $ 80.00 $ 0.00
C.Y. $ 90.00 $ 0.00
C.Y. $ 100.00 $ 0.00
C.Y. $ 110.00 $ 0.00
C.Y. $ 100.00 $ 0.00
C.Y. $ 120.00 $ 0.00
C.Y. $ 130.00 $ 0.00
C.Y. $ 140.00 $ 0.00
L.F. $ 113.00 $ 5,424.00
L.F. $ 132.00 $ 0.00
L.F. $ 153.00 $ 0.00
L.F. $ 178.00 $ 0.00
L.F. $ 204.00 $ 0.00
L.F. $ 235.00 $ 0.00
L.F. $ 40.00 $ 0.00
L.F. $ 50.00 $ 0.00
L.F. $ 60.00 $ 0.00
L.F. $ 70.00 $ 0.00
L.F. $ 80.00 $ 0.00
L.F. $ 100.00 $ 0.00
EA. $ 2,500.00 $ 0.00
EA. $ 4,000.00 $ 0.00
EA. $ 7,500.00 $ 7,500.00
Catch Basin W=7'
Catch Basin W=14' 1
42" C.S.P. or HDPE N12
48" C.S.P. or HDPE N12
Catch Basin W=4'
24" C.S.P. or HDPE N12
30" C.S.P. or HDPE N12
36" C.S.P. or HDPE N12
42" R.C.P. round, arch or elliptical
48" R.C.P. round, arch or elliptical
18" C.S.P. or HDPE N12
24" R.C.P. round, arch or elliptical
30" R.C.P. round, arch or elliptical
36" R.C.P. round, arch or elliptical
Grouted Rip Rap ( 1 Ton ) Method B
Grouted Rip Rap ( 2 Ton ) Method B
18" R.C.P. round, arch or elliptical 48
Rip Rap ( 2 Ton ) Method B
Grouted Rip Rap ( 1/4 Ton ) Method B
Grouted Rip Rap ( 1/2 Ton ) Method B
Rip Rap ( 1/4 Ton ) Methob B ( 1.9 tons /CY)
Rip Rap ( 1/2 Ton ) Method B
Rip Rap ( 1 Ton ) Method B
Interceptor Drain
R.C. Box Culvert (2 - 3'X5' )
Concrete Channel
Flat Outlet Drainage Structure Std 303
Curb Outlet Drainage Structure Std 308
Terrace Drain & Down Drain
Cut Off Wall ( Std 2' )
A. C. Overside Drain
Under Sidewalk Drain Std 309

DRAINAGE
Concrete Bulkhead
Slope Anchors for Pipes
Remove trees
Landscape Fill Material
Water Meter
Electric Meter
Colored Stamped Concrete
Street Trees ( 15 Gallon )
Landscape and Irrigation

LANDSCAPING
Maintenance Walk STD 113
EA. $ 11,000.00 $ 11,000.00
EA. $ 14,500.00 $ 0.00
EA. $ 2,500.00 $ 0.00
EA. $ 3,500.00 $ 0.00
EA. $ 4,500.00 $ 0.00
EA. $ 5,000.00 $ 0.00
EA. $ 12,500.00 $ 0.00
EA. $ 12,500.00 $ 0.00
EA. $ 4,500.00 $ 0.00
EA. $ 5,000.00 $ 0.00
EA. $ 6,500.00 $ 0.00
EA. $ 2,700.00 $ 0.00
EA. $ 6,500.00 $ 0.00
C.Y. $ 400.00 $ 0.00
EA. $ 3,500.00 $ 0.00
EA. $ 200.00 $ 0.00
EA. $ 100.00 $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
S.F $ 2.50 $ 0.00
L.F. $ 0.21 $ 0.00
L.F. $ 0.30 $ 0.00
L.F. $ 0.16 $ 0.00
L.F. $ 0.47 $ 0.00
L.F. $ 0.65 $ 0.00
L.F. $ 0.82 $ 0.00
L.F. $ 1.30 $ 0.00
L.F. $ 0.36 $ 0.00
L.F. $ 0.82 $ 0.00
S.F $ 2.70 $ 0.00
S.F $ 2.50 $ 0.00
L.F. $ 0.52 $ 0.00
L.F. $ 0.47 $ 0.00
L.F. $ 0.83 $ 0.00
L.F. $ 0.63 $ 0.00
L.F. $ 0.78 $ 0.00
L.F. $ 0.97 $ 0.00
L.F. $ 1.13 $ 0.00
L.F. $ 2.83 $ 0.00
S.F $ 3.61 $ 0.00
S.F. $ 2.25 $ 0.00
S.F. $ 3.00 $ 270.00
EA. $ 50.00 $ 0.00
EA. $ 100.00 $ 0.00
EA. $ 275.00 $ 4,125.00Street Name Sign 15
Thermoplastic Cross Walk and Pavement Marking 90
Remove, Sign, Salvage
Relocate Roadside Sign
Thermoplastic Two-Way Left Turn Lane
Thermoplastic Pavement MarkingsThermoplastic Channelizing Limit Line and Pavement Marking
8" Thermoplastic Channelizing Line
12" Thermoplastic Crosswalk & Limit Line
Thermoplastic One-Way, No Passing
4" Thermoplastic Broken Stripes
4" Thermoplastic Double Solid Stripes
6" Thermoplastic Bike Lane Stripes
Painted Pavement Markings
Remove Thermoplastic Trafffic Stripes and Markings
4" Thermoplastic Solid Stripes
12" Painted Crosswalk & Limit Line
Painted One-Way, No Passing
Painted Two-Way Left Turn Lane
4" Painted Double Solid Stripes
6" Painted Bike Lane Stripes
8" Painted Channelizing Line
4" Painted Solid Stripes
4" Painted Solid Stripes (2 Coats )
4" Painted Broken Stripes

SIGNING, STRIPING AND SIGNALS
Remove Painted Traffic Stripes and Markings
Remove Concrete Bulkhead
Structural Reinforcement Concrete
Headwall for 36" or smaller storm drain
Concrete Collar
Manhole No. 2
Manhole No. 3
Manhole No. 4
Transition Structure No. 2
Transition Structure No. 3
Manhole No. 1
Junction Structure No. 2
Junction Structure No. 6
Transition Structure No. 1
Catch Basin W=28'
Inlet Type IX or X
Junction Structure No. 1
Catch Basin W=21' 1
EA. $ 150.00 $ 0.00
EA. $ 425.00 $ 0.00
EA. $ 250.00 $ 1,250.00
EA. $ 150.00 $ 0.00
EA. $ 300.00 $ 0.00
EA. $ 60.00 $ 0.00
EA. $ 40.00 $ 0.00
EA. $ 45.00 $ 0.00
EA. $ 3.75 $ 0.00
LS $ 250,000.00 $ 0.00
LS $ 150,000.00 $ 0.00
LS $ 100,000.00 $ 0.00
EA $ 450.00 $ 0.00
EA $ 400.00 $ 0.00
EA $ 500.00 $ 0.00
L.F. $ 25.00 $ 0.00
L.F. $ 30.00 $ 0.00
L.F. $ 35.00 $ 0.00
$ $ 0.00
LS $ 8,000.00 $ 0.00
LS $ 40,000.00 $ 0.00
LS $ 30,000.00 $ 0.00
LS $ 15,000.00 $ 0.00
A. $ 721,121.00
B. Administrative Contingency (20% x A) $ 144,224.20
C. CM - Inspection - LC (8%) $ 57,689.68
D Streets/Drainage Total (A + B) $ 923,034.88
Subtotal
Design/submittals/review
Mobilization
Traffic Control
3" PVC Conduit & Fiber Optic Cable
Survey
Install Pull Box (#6)
2" PVC Interconnect Conduit & Cable
3" PVC Interconnect Conduit & Cable
Retrofit of Ex. Traffic Signal & Lighting
6' Round Signal Loops
Install Pull Box (#5)
Pavement Marker, Reflective
New Traffic Signal & Lighting (Major Intersection)
New Traffic Signal & Lighting (Minor Intersection)
Object Marker - Modified Type "F" Delineator
Delineator ( Class 1 Type F)
Delineator ( Class 2 )
Stop Sign & Post 5
Road Sign on existing pole / post (One Post)
Road Sign on existing pole / post (Two Post)
Install Sign ( Strap and Saddle Bracket Method)
Install Sign (Mast Arm Hanger Method)

UNIT
L.F. $ 25.00 $ 0.00
L.F. $ 30.00 $ 0.00
L.F. $ 35.00 $ 69,300.00
L.F. $ 55.00 $ 0.00
L.F. $ 90.00 $ 0.00
L.F. $ 135.00 $ 0.00
L.F. $ 180.00 $ 0.00
EA. $ 715.00 $ 0.00
EA. $ 830.00 $ 0.00
EA. $ 1,340.00 $ 5,360.00
EA. $ 2,300.00 $ 0.00
EA. $ 6,270.00 $ 0.00
EA. $ 14,300.00 $ 0.00
EA. $ 4,000.00 $ 20,000.00
EA. $ 4,500.00 $ 0.00
EA. $ 3,500.00 $ 0.00
EA. $ 4,000.00 $ 0.00
EA. $ 2,400.00 $ 4,800.00
EA. $ 4,000.00 $ 0.00
EA. $ 800.00 $ 64,800.00
EA. $ 2,480.00 $ 0.00
EA. $ 2,780.00 $ 0.00
EA. $ 4,500.00 $ 4,500.00
EA. $ 200.00 $ 0.00
EA. $ 500.00 $ 3,000.00
EA. $ 2,000.00 $ 2,000.00
EA. $ 1,000.00 $ 0.00
EA. $ 1,430.00 $ 0.00
EA. $ 1,750.00 $ 0.00
EA. $ 2,200.00 $ 0.00
EA. $ 3,150.00 $ 0.00
EA. $ 250.00 $ 4,250.00
EA. $ 320.00 $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
A. $ 178,010.00
B. $ 35,602.00
C. $ 213,612.00
D. $ 42,722.40
E. $ 256,334.40
20% x C
Water Total (C + D)

BOND AMOUNT FOR RECORDATION PRIOR

TO HAVING SIGNED PLANS
Subtotal
Administrative Contingency (20% x A)
Water Total (A + B)
12" Miscellaneous Fittings
Blue Retro-Reflective Hydrant Marker 5
8" Hot Tap
12" Hot Tap
8" Miscellaneous Fittings 17
1" Hot Tap
4" Hot Tap
6" Hot Tap
Adjust Water Valve to Grade
Removal of Blowoff 6
Join at existing end of 8" pipe 1
1-1/2" Service Connection ( No Meter)
2" Service Connection ( No Meter)
4" Service Connection ( No Meter) 1
1" Air and Vacuum Valve. 2
2" Air and Vacuum Valve.
1" Service Connection ( No Meter) 81
6" Fire Hydrant (Super)
4" Blowoff
6" Blowoff
16" Gate Valve RS
18" Gate Valve RS
6" Fire Hydrant (Standard) 5
6" Gate Valve RS
8" Gate Valve RS 4
12" Gate Valve RS
18" Waterline PVC C-905 DR-18
20" Waterline PVC C-905 DR-18
4" Gate Valve RS
8" Waterline PVC C-900 DR-18 1,980
12" Waterline PVC C-900 DR-18
16" Waterline PVC C-905 DR-18
COST
4" Waterline PVC C-900 DR-18
6" Waterline PVC C-900 DR-18

CITY OF MENIFEE ENGINEERING DEPARTMENT

IMPROVEMENT REQUIREMENT WORKSHEET

DOMESTIC WATER IMPROVEMENTS

ITEM QUANTITY UNIT AMOUNT

CITY OF MENIFEE ENGINEERING DEPARTMENT

IMPROVEMENT REQUIREMENT WORKSHEET

RECYCLED WATER IMPROVEMENTS

UNIT
L.F. $ 25.00 $ 0.00
L.F. $ 30.00 $ 0.00
L.F. $ 35.00 $ 0.00
L.F. $ 55.00 $ 0.00
L.F. $ 90.00 $ 0.00
L.F. $ 135.00 $ 0.00
L.F. $ 180.00 $ 0.00
EA. $ 715.00 $ 0.00
EA. $ 830.00 $ 0.00
EA. $ 1,340.00 $ 0.00
EA. $ 2,300.00 $ 0.00
EA. $ 6,270.00 $ 0.00
EA. $ 14,300.00 $ 0.00
EA. $ 3,500.00 $ 0.00
EA. $ 4,000.00 $ 0.00
EA. $ 2,400.00 $ 0.00
EA. $ 4,000.00 $ 0.00
EA. $ 800.00 $ 0.00
EA. $ 2,480.00 $ 0.00
EA. $ 2,780.00 $ 0.00
EA. $ 4,500.00 $ 0.00
EA. $ 200.00 $ 0.00
EA. $ 500.00 $ 0.00
EA. $ 2,000.00 $ 0.00
EA. $ 1,000.00 $ 0.00
EA. $ 1,430.00 $ 0.00
EA. $ 1,750.00 $ 0.00
EA. $ 2,200.00 $ 0.00
EA. $ 3,150.00 $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
A. $ 0.00
B. $ 0.00
C. $ 0.00
D. $ 0.00
E. $ 0.00
Subtotal
Administrative Contingency (20% x A)
Water Total (A + B)BOND AMOUNT FOR RECORDATION PRIOR

TO HAVING SIGNED PLAND
20% x C
Water Total (C + D)
8" Hot Tap
12" Hot Tap
1" Hot Tap
4" Hot Tap
6" Hot Tap
Adjust Water Valve to Grade
Removal of Blowoff
Join at existing end of 8" pipe
1-1/2" Service Connection ( No Meter)
2" Service Connection ( No Meter)
4" Service Connection ( No Meter)
1" Air and Vacuum Valve.
2" Air and Vacuum Valve.
1" Service Connection ( No Meter)
18" Gate Valve RS
4" Blowoff
6" Blowoff
8" Gate Valve RS
12" Gate Valve RS
16" Gate Valve RS
20" Waterline PVC C-905 DR-18 Purple
4" Gate Valve RS
6" Gate Valve RS
12" Waterline PVC C-900 DR-18 Purple
16" Waterline PVC C-905 DR-18 Purple
18" Waterline PVC C-905 DR-18 Purple
4" Waterline PVC C-900 DR-18 Purple
6" Waterline PVC C-900 DR-18 Purple
8" Waterline PVC C-900 DR-18 Purple
COST

ITEM QUANTITY UNIT AMOUNT

UNIT
L.F. $ 25.00 $ 24,500.00
L.F. $ 30.00 $ 0.00
L.F. $ 35.00 $ 26,250.00
L.F. $ 46.00 $ 0.00
L.F. $ 54.00 $ 0.00
L.F. $ 90.00 $ 0.00
L.F. $ 55.00 $ 0.00
L.F. $ 62.00 $ 0.00
L.F. $ 72.00 $ 0.00
L.F. $ 81.00 $ 0.00
L.F. $ 162.00 $ 0.00
L.F. $ 183.00 $ 0.00
L.F. $ 195.00 $ 0.00
L.F. $ 215.00 $ 0.00
L.F. $ 236.00 $ 0.00
EA. $ 3,140.00 $ 12,560.00
EA. $ 4,500.00 $ 0.00
EA. $ 3,300.00 $ 0.00
EA. $ 730.00 $ 0.00
EA. $ 200.00 $ 16,200.00
EA. $ 2,100.00 $ 0.00
EA. $ 1,500.00 $ 0.00
EA. $ 1,500.00 $ 4,500.00
EA. $ 2,000.00 $ 0.00
EA. $ 400.00 $ 0.00
EA. $ 500.00 $ 0.00
L.F. $ 35.00 $ 0.00
EA. $ 250.00 $ 7,500.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
A. $ 91,510.00
B. $ 18,302.00
C. $ 109,812.00
D. $ 21,962.40
E. $ 131,774.40
20% x C
Sewer Total (C + D)
Subtotal
Administrative Contingency (20% x A)
Sewer Total (A + B)BOND AMOUNT FOR RECORDATION PRIOR
TO HAVING SIGNED PLAND ( ORD.460, SEC.

Concrete Encasement
8" Backflow Valves 30
Join Existing 12" Pipe
Chimney
Adjust M.H. to grade
Tie to Existing Manhole
Rechannel Existing Manhole
Join Existing 8" Pipe/Remove Temp Cleanout & Join 3
Shallow Manhole (5' or less)
Clean out
Clean out Lateral 81
30" VCP
Standard Manhole 48" 4
Standard Manhole 60"
21" VCP
24" VCP
27" VCP
12" VCP
15" VCP
18" VCP
15" PVC SDR 35 Green
8" VCP
10" VCP
8" PVC SDR 35 Green 750
10" PVC SDR 35 Green
12" PVC SDR 35 Green
COST
4" PVC SDR 35 (Use it for Residential Laterals) 980
6" PVC SDR 35 Green

CITY OF MENIFEE ENGINEERING DEPARTMENT

IMPROVEMENT REQUIREMENT WORKSHEET

SANITARY SEWER IMPROVEMENTS

ITEM QUANTITY UNIT AMOUNT

PARCEL MAP OR TRACT NO. SCH: DATE:

PP, CU, PU, MS OR VL NO.
$ 923,034.88
$ 213,612.00
$
$ 109,812.00
$ 1,246,458.88
$ 27,691.05
Total

INSPECTION DEPOSIT CALCULATION
Street/DrainageA. Street/Drainage ( % x I.)
NOTE: Use 3% for Inspection
IV. Sewer (Line C from Sewer Improvement Calculations)

CITY OF MENIFEE ENGINEERING DEPARTMENT

COST ESTIMATE CALCULATION SHEET
TR 36658-4
IMPROVEMENT COSTS (Including Contingencies)
I. Streets/Drainage (Line C from Street Improvement Calculations) II. Domestic Water (Line C from Domestic Water Improvement Calculations) III. Recycled Water (Line C from Recycled Water Improvement Calculations) 10/15/2024

CITY OF MENIFEE

OFFICE OF THE CITY SURVEYOR

MONUMENT BOND COMPUTATION
MAP # TR 36658-4 SCHEDULE A MAP CHECKER Dennis Janda

Cost per Monument
$2500.00* $300
$2500.00* $600
x + 20% = Total Bond Amount
x x 120% = $96,840.00
$
Date: 9/17/2024
Total Monuments to be Bonded
Schedule "I" Maps
Minimum Cost
Schedule "A" through "H" Maps
Cost per Monument
269 $300
Monument Inspection Fee (Deposit Based)
( ) Set monuments
( ) Monuments will need to be recovered and/or reset at time of inspection Submitted Monument Bond Computation to Planning Dept. Plan Check Review * Based on a crew of,
1) Registered Principal Eng. Technician, 1) Senior Eng. Technician. 1 CITY OF MENIFEE

OFFICE OF THE CITY SURVEYOR

MONUMENT BOND COMPUTATION
REVISED 2010
1