October 23, 2024 Planning Commission Staff Report

Menifee City Council
December 4, 2024

Document
October 23, 2024 Planning Commission Staff Report
Meeting
December 4, 2024
Body
Menifee City Council
Pages
38
Original file
16.5 MB
Text extracted from the city's file for reading and search. Open the original on cityofmenifee.primegov.com. That file is the official record.

The Public Works / Engineering Department shall record the original declaration of CC&R’s prior to…… the issuance of Certificate of Occupancy or building permit issuance.
d. A deposit to pay for the review of the CC&Rs pursuant to the City’s current fee schedule at the time the above-referenced documents are submitted to the Public Works / Engineering Department.
156. Street Design Standards – Street improvements shall conform to all applicable City Design Standards and Specifications, the City General Plan, Ordinances, and all other relevant laws, rules and regulations governing street construction in the City. 157. Concrete Work – All concrete work including curbs, gutters, sidewalks, driveways, cross gutters, catch basins, manholes, vaults, etc. shall be constructed to meet a 28-day minimum concrete strength of 3,250 psi.
158. Intersection Geometrics – All final intersection geometrics may be modified in final engineering as approved by the Public Works Director / City Engineer. 159. Street Improvements – Street improvements shall conform to all applicable City Design Standards and Specifications, the City General Plan, and all other relevant laws, rules and regulations governing street construction in the City.
160. Soils and Pavement Report - Street pavement structural designs shall comply with the recommendations in the City approved project soils and pavement investigation report, and must meet minimum City standards and specifications, as approved by the Public Works Director / City Engineer. R-Values shall be provided in said report and the Engineer of Record shall provide pavement calculations to the City.
161. Driveways - Final driveway geometrics may be modified in final engineering as approved by the Public Works Director / City Engineer. Driveways shall meet current standard radii on all existing and proposed commercial drive approaches used as access to the proposed development. The developer shall adhere to all City standards and regulations for access and ADA guidelines.
162. Acceptance of Public Roadway Dedication and Improvements – Easements and right- of way for public roadways required by this project shall be granted to the City through acceptable recordable instrument. Onsite easements and right-of way for public roadways 4 9
1 6
3 shall be granted to the City of Menifee through the final map, or other acceptable recordable instrument. Any off-site rights-of-way required for access road(s) shall be accepted to vest title in the name of the public if not already accepted. Any shared access roads necessary for the adequate circulation of the proposed project, shall be dedicated for reciprocal access by acceptable recordable instrument prior to any permit issuance. 163. ADA Compliance – ADA path of travel shall be designed at the most convenient accesses and the shortest distance to the buildings in accordance with ADA design standards and to the satisfaction of the Public Works Director / City Engineer and the City Building Official. 164. Paving or Paving Repairs – The applicant shall be responsible for obtaining the paving inspections required by City of Menifee standards and ordinances. Paving and/or paving repairs for utility street cuts shall be per City of Menifee Standards and Specifications and as approved by the Public Works Director / City Engineer.
165. Street Light Plan – Street lights requiring relocations, or any required new streetlights shall be designed in accordance with current City Standards for LS-3 type streetlights. Street light construction plans shall be prepared as separate plans or combined with the public street improvement plans as approved by the Public Works Director / City Engineer. 166. Public Streetlights Service Points – All proposed public streetlights shall be provided with necessary appurtenances and service points for power, separate from privately owned streetlights. The developer/property owner shall coordinate with the PW Department and with Southern California Edison the assignment of addresses to streetlight service points. Service points for proposed public streetlights shall become public and shall be located within public right of way or within duly dedicated public easements. 167. CFD Maintenance - The property owner shall file for annexation or inclusion into the Citywide Community Facilities Maintenance District, CFD for street sweeping services, street pavement maintenance, landscaping, street lighting, etc. 168. Offsite Grading – If necessary, a notarized and recorded agreement, or City-approved documents authorizing the offsite grading shall be submitted to the Public Works / Engineering Department.
169. Sight Distance Analysis – Sight distance analysis shall be conducted at all project roadway entrances for conformance with City sight distance standards. The analysis shall be reviewed and approved by the Public Works Director / City Engineer, and shall be incorporated in the final grading plans, street improvement plans, and landscape improvement plans.
170. Street Name Sign - The developer/property owner shall install street name sign(s) in accordance with applicable City Standards, or as directed by the PW Engineering Department.
171. Driveway Geometrics- Final driveway geometrics may be modified in Final Engineering as approved by the Public Works Director. Driveways shall meet current standard radii on all existing and proposed commercial drive approaches used as access to the proposed development. The developer shall adhere to all City standards and regulations for access and ADA guidelines.
4 9
1 6
3 172. Construction Traffic Control Plan - Prior to start of any project related construction, the developer/property owner shall submit to the Public Works Engineering Department for review and approval, a Construction Traffic Control Plan in compliance with all applicable City ordinances, standards and specifications, and the latest edition of the CAMUTCD. This traffic control plan shall address impacts from construction vehicular traffic, noise, and dust and shall propose measures to mitigate these effects. The traffic control plan shall include a Traffic Safety Plan for safe use of public roads right-of-way during construction. 173. Traffic Signal Control Devices – All new traffic signals and traffic signal modifications required for construction by this development project shall include traffic signal communication infrastructure, network equipment, and Advanced Traffic Management System (ATMS) license software. Said traffic signal control devices shall be submitted with the traffic signal design plans and shall be approved by the Public Works Director / City Engineer, prior to testing of a new traffic signal. Traffic signal poles shall be placed at the ultimate locations when appropriate.
174. Cost participation through Payment of TUMF and DIF for Improvements- The developer/property owner’s TUMF and DIF payment obligations shall be considered as cost participation for Project’s required offsite improvements only when the offsite improvements for which credits are claimed, are eligible TUMF and/or DIF facilities at time of TUMF and DIF payments. Determination for TUMF credits shall be at the discretion of the Western Riverside Council of Governments (WRCOG), the governing authority, which shall include entering a three party TUMF Credit Agreement with the developer, WRCOG and the City of Menifee.
175. Improvement Bonds – Prior to improvement plan approval and issuance of any construction permit for all required onsite and offsite public improvements, the developer/project owner shall enter into a bond agreement and post acceptable bonds or security, to guarantee the completion of all required improvements. The bonds shall be in accordance with all applicable City ordinances, resolutions, and municipal codes. 176. Encroachment Permits – The developer/property owner shall obtain all required encroachment permits and clearances prior to start of any work within City, State, or local agency right-of-way.
177. Stormwater Management - All City of Menifee requirements for NPDES and Water Quality Management Plans (WQMP) shall be met per City of Menifee Municipal Code Chapter 15.01 for Stormwater/Urban Runoff Management Program unless otherwise approved by the Public Works Director/City Engineer. This project is required to submit a project specific WQMP prepared in accordance with the latest WQMP guidelines approved by the Regional Water Quality Control Board.
178. Trash Enclosures Standards and Specifications – Storm runoff resulting in direct contact with trash enclosure, or wastewater runoff from trash enclosure are prohibited from running off a site onto the City MS4 without proper treatment. Trash enclosures in new developments and redevelopment projects shall meet new storm water quality standards including:
a) Provision of a solid impermeable roof with a minimum clearance height to allow the bin lid to completely open.
4 9
1 6
3 b) Constructed of reinforced masonry without wooden gates. Walls shall be at least 6 feet high.
c) Provision of concrete slab floor, graded to collect any spill within the enclosure. d) All trash bins in the trash enclosure shall be leak proof with lids that are continuously kept closed.
e) The enclosure area shall be protected from receiving direct rainfall or run-on from collateral surfaces.
f) The trash enclosure shall be lockable and locked when not in use with a 2-inch or larger brass resettable combination lock. Only employees and staff authorized by the enclosure property owner shall be given access.

Any standing liquids within the trash enclosures without floor drain must be cleaned up and disposed of properly using a mop and a bucket or a wet/dry vacuum machine. All non- hazardous liquids without solid trash may be put in the sanitary sewer as an option, in accordance with Eastern Municipal Water District (EMWD) criteria.

An alternate floor drain from the interior of the enclosure that discharges to the sanitary sewer may be constructed only after obtaining approval from EMWD. This option requires the following:
a) The trash enclosure shall be lockable and locked when not in use with a 2-inch or larger brass resettable combination lock. Only employees and staff authorized by the enclosure property owner shall be given access. This requirement may not be applicable to commercial complexes with multiple tenants.
b) A waterless trap primer shall be provided to prevent escape of gasses from the sewer line and save water.
c) Hot and cold running water shall be provided with a connection nearby with an approved backflow preventer. The spigot shall be protected and located at the rear of the enclosure to prevent damage from bins.
179. SWRCB, Trash Amendments - The State Water Resources Control Board (State Board) adopted amendments to the Water Quality Control Plan for Ocean Waters of California and the Water Quality Control Plan for Inland Surface Waters, Enclosed Bays, and Estuaries – collectively referred to as the “Trash Amendments.” Applicable requirements per these amendments shall be adhered to with implementation measures, prior to building permit issuance. Projects determined to be within Priority Land Uses as defined in the Trash Amendments, shall provide trash full capture devices in all new and existing catch basins to which this development will be tributary to or receiving from all Priority Land Use areas that will contribute storm water runoff to the City of Menifee’s MS4. All trash full capture devices shall be listed on the State Board’s current list of certified full capture devices posted on their website
(
https://www.waterboards.ca.gov/water_issues/programs/stormwater/trash_implementation. shtml), or otherwise approved by State or Regional Water Quality Control Board staff. Storm water runoff from privately owned Priority Land Use areas shall be treated by full capture devices located within privately owned storm drain structures or otherwise located on the privately owned property, whenever possible. Runoff from Priority Land Use areas created or modified by the project, and which are proposed to be City owned, shall be treated by full capture devices located within city-owned storm drains or otherwise located within the public right of way.

4 9
1 6
3 Existing and proposed catch basins shall be retrofitted with a catch basin insert device selected from the list of approved devices by the Santa Ana Regional Water Quality Control Board, and compliant with the State-wide Trash TMDL.

The State Water Resources Control Board, Resolution adopted an amendment to the Water Quality Control Plan for ocean waters of California to control trash, and Part 1 Trash Provisions of the Water Quality Control Plan for inland surface waters, enclosed bays, and estuaries of California. Applicable requirements per these amendments shall be adhered to with implementation measures, prior to building permit issuance. Projects determined as within Priority Land Uses as defined in the amendment, shall provide full trash capture devices in all new catch basins and existing catch basins to which this development will be tributary to. Devices shall meet the requirement of the new Trash Amendment. 180. Prior to issuance of a grading permit, a FINAL project specific WQMP in substantial conformance with the approved PRELIMINARY WQMP, shall be reviewed and approved by the Public Works Engineering Department. Final construction plans shall incorporate all the structural BMPs identified in the approved FINAL WQMP. The final developed project shall implement all structural and non-structural BMPs specified in the approved FINAL WQMP.

One copy of the approved FINAL WQMP on a CD-ROM in pdf format shall be submitted to the Public Works Engineering Department. The FINAL WQMP submittal shall include at the minimum the following reports/studies:
a) Hydrology/hydraulics report
b) Soils Report that includes soil infiltration capacity c) Limited Phase II Environmental Site Assessment Report, as may be required by an approved Phase I ESA Report
Final construction plans shall incorporate all the structural BMPs identified in the approved FINAL WQMP. The final developed project shall implement all structural and non-structural BMPs specified in the approved FINAL WQMP. One copy of the approved FINAL WQMP on a CD-ROM in pdf format shall be submitted to the Public Works Engineering Department. 181. Revising The Final WQMP - In the event the Final WQMP requires design revisions that will substantially deviate from the approved Prelim WQMP, a revised or new WQMP shall be submitted for review and approval by the Public Works / Engineering Department. The cost of reviewing the revised/new WQMP shall be charged on a time and material basis. The fixed fee to review a Final WQMP shall not apply, and a deposit shall be collected from the applicant to pay for reviewing the substantially revised WQMP. 182. WQMP Maintenance Agreement - All water quality features or BMPs shall be located within the property limits, and the maintenance shall be the full responsibility of the developer / project owner. Prior to, or concurrent with the approval of the FINAL WQMP, the developer / property owner shall record Covenants, Conditions and Restrictions (CC&R’s) that addresses the implementation and maintenance of proposed WQMP BMPs, or enter into an acceptable maintenance agreement with the City to inform future property owners of the requirement to perpetually implement the approved FINAL WQMP. 183. Implement Project Specific WQMP - All structural BMPs described in the project-specific WQMP shall be constructed or installed and operational in conformance with approved plans and specifications. It shall be demonstrated that the applicant is prepared to implement all BMPs described in the approved project specific WQMP and that copies of the approved 4 9
1 6
3 project-specific WQMP are available for the future owners/occupants. The City will not release occupancy permits for any portion of the project or subdivision map phase until all proposed BMPs described in the approved project specific WQMPs, to which the portion of the project is tributary to, are completed and operational.

The City will not release occupancy permits for any portion of the project, or any proposed map phase prior to the completion of the construction of all required structural BMPs, and implementation of non-structural BMPs.
184. Inspection of BMP Installation – Prior to issuance of Certificate of Occupancy, all structural BMPs included in the approved FINAL WQMP shall be inspected for completion of installation in accordance with approved plans and specifications, and the FINAL WQMP.

The Public Works Stormwater Inspection team shall verify that all proposed structural BMPs are in working conditions, and that a hard copy and / or digital copy of the approved FINAL WQMP are available at the site for use and reference by future owners/occupants. The inspection shall ensure that the FINAL WQMP at the site includes the BMP Operation and Maintenance Plan, and shall include the site in a City maintained database for future periodic inspection.
185. WQMP/BMP Education - Prior to issuance of Certificate of Occupancy, the developer / project owner shall provide the City proof of notification to future occupants of all BMP’s and educational and training requirements for said BMP’s as directed in the approved WQMP.

Proof of notification shall be provided to the Public Works / Engineering Department in forms determined acceptable by the Public Works Director / City Engineer. Public Education Program materials may be obtained from the Riverside County Flood Control and Water Conservation District’s NPDES Section through their website at www.rcwatershed.org. The developer must provide to the Public Works / Engineering Department a notarized affidavit, or other notification forms acceptable to the Public Works Director / City Engineer, stating that the distribution of educational materials to future homebuyers has been completed prior to issuance of occupancy permits.

A copy of the notarized affidavit must be placed in the final WQMP report. The Public Works / Engineering Department MUST also receive the original notarized affidavit with the plan check submittal to clear the appropriate condition. Placing a copy of the affidavit without submitting the original will not guarantee clearance of the condition. 186. EMWD Minimum Standards – All public water, sewer and recycled water improvements shall be designed per the City adopted Ordinances; Eastern Municipal Water Districts (EMWD) standards and specifications, including required auxiliaries and appurtenances. The final design, including pipe sizes and alignments, shall be subject to the approval of EMWD and the City of Menifee.
187. Utility Improvement Plans – Public Water, Sewer and Recycled Water improvements shall be drawn on City title block for review and approval by the Public Works / Engineering Department and EMWD.
188. Onsite and Offsite Sewer, Water and Recycled Water Improvements – All public onsite and offsite sewer, water and recycled water improvements shall be guaranteed for construction prior to approval of improvement plans and final map approval. 4 9
1 6
3 189. Sewer Lines – Any new public sewer line alignments or realignments shall be designed such that the manholes are aligned with the center of lanes or on the lane line and in accordance with City Ordinances and Eastern Municipal Water District standards. 190. Water Mains and Hydrants - All water mains and fire hydrants providing required fire flows shall be constructed in accordance with City Ordinances, and subject to the approval of the Eastern Municipal Water District and the Riverside County Fire Department. 191. Annexation to the Citywide Community Facilities District (CFD) - Prior to the issuance of a Building Permit Issuance the developer/property owner shall complete the annexation of the proposed development, into the boundaries of the City of Menifee citywide Community Facilities Maintenance District (Services) CFD. The citywide CFD shall be responsible for:

The maintenance of public improvements or facilities that benefit this development, including but not limited to, public landscaping, streetlights, traffic signals, streets, pavement maintenance, drainage facilities, street sweeping, water quality basins, graffiti abatement, and other public improvements or facilities as approved by the Public Works Director.

The developer/property owner shall be responsible for all cost associated with the annexation of the proposed development in the citywide CFD.
192. Landscape Improvement Plans for CFD Maintenance – Landscape improvements within public ROW and/or areas dedicated to the City for the citywide CFD to maintain shall be prepared on a separate City CFD plans for review and approval by the PW Engineering Department. The plans may be prepared as one plan for the entire development as determined by the PW Director. When necessary, as determined by the PW Director, a separate WQMP construction plan on City title block maybe required for review and approval by the PW Engineering Department prior to issuance of a grading permit. 193. Parkway Landscaping Design Standards - The parkway areas behind the street curb within the public’s right-of-way, shall be landscaped and irrigated per City standards and guidelines.
194. CFD Landscape Guidelines and Improvement Plans – All landscape improvements for maintenance by the CFD shall be designed and installed in accordance with City CFD Landscape Guidelines, and shall be drawn on a separate improvement plan on City title block. The landscape improvement plans shall be reviewed and approved by the PW Engineering Department prior to issuance of a construction permit. 195. Maintenance of CFD Accepted Facilities – All landscaping and appurtenant facilities to be maintained by the citywide CFD shall be built to City standards. The developer shall be responsible for ensuring that landscaping areas to be maintained by the CFD have its own controller and meter system, separate from any private controller/meter system. 196. AB 341. AB 341 focuses on increased commercial waste recycling as a method to reduce greenhouse gas (GHG) emissions. The regulation requires businesses and organizations that generate four or more cubic yards of waste per week and multifamily units of 5 or more, to recycle. A business shall take at least one of the following actions to reuse, recycle, compost, or otherwise divert commercial solid waste from disposal:

4 9
1 6
3 a) Source separate recyclable and/or compostable material from solid waste and donate or self-haul the material to recycling facilities. b) Subscribe to a recycling service with their waste hauler. c) Provide recycling service to their tenants (if commercial or multi-family complex).
d) Demonstrate compliance with the requirements of California Code of Regulations Title 14.

For more information please visit:
www.rivcowm.org/opencms/recyclying/recycling_and_compost_business.html#mandatory

197. AB 1826. AB 1826 (effective April 1, 2016) requires businesses that generate eight (8) cubic yards or more or organic waste per week to arrange for organic waste recycling services. The threshold amount of organic waste generated requiring compliance by businesses is reduced in subsequent years. Businesses subject to AB 1826 shall take at least one of the following actions in order to divert organic waste from disposal:

Source separate organic material from all other recyclables and donate or self-haul to a permitted organic waste processing facility.

Enter into a contract or work agreement with gardening or landscaping service provider or refuse hauler to ensure the waste generated from those services meet the requirements of AB 1826.

Consider xeriscaping and using drought tolerant/low maintenance vegetation in all landscaped areas of the project.

As of January 1, 2019, the above requirements are now applicable to businesses that generate four (4) or more cubic yards of solid waste per week and one (1) or more cubic yards of organic waste per week. Additionally, as of January 1, 2019, a third trash bin is now required for organics recycling, which will require a larger trash enclosure to accommodate three (3) trash bins. This development is subject to this requirement. 198. Recyclables Collection and Loading Area Plot Plan. Prior to the issuance of a building permit for each building, the applicant shall submit three (3) copies of a Recyclables Collection and Loading Area plot plan to the City of Menifee Engineering/Public Works Department for review and approval. The plot plan shall show the location of and access to the collection area for recyclable materials, along with its dimensions and construction detail, including elevation/façade, construction materials and signage. The plot plan shall clearly indicate how the trash and recycling enclosures shall be accessed by the hauler.

The applicant shall provide documentation to the Community Development Department to verify that Engineering and Public Works has approved the plan prior to issuance of a building permit.
199. Waste Recycling Plan. Prior to the issuance of a building permit for each building, a Waste Recycling Plan (WRP shall be submitted to the City of Menifee Engineering/Public Works Department for approval. Completion of Form B “Waste Reporting Form” of the Construction and Demolition Waste Diversion Program may be sufficient proof of WRP compliance, as determined by the Public Works Director / City Engineer. At minimum, the WRP must identify the materials (i.e., concrete, asphalt, wood, etc.) that will be generated by 4 9
1 6
3 construction and development, the projected amounts, the measures/methods that will be taken to recycle, reuse, and/or reduce the amounts of materials, the facilities and/or haulers that will be utilized, and the targeted recycling or reduction rate. During project construction, the project site shall have, at a minimum, two (2) bins; one for waste disposal and the other for recycling of Construction and Demolition (C&D) materials. Additional bins are encouraged to be used to further source separation of C&D recyclable materials. Accurate record keeping (receipts) for recycling of C&D recyclable materials and solid waste disposal must be kept.

Arrangements can be made through the franchise hauler.
200. Waste Management Clearance. Prior to issuance of an occupancy permit for each building, evidence (i.e., receipts or other type of verification) shall be submitted to demonstrate project compliance with the approved WRP to the Engineering and Public Works Department in order to clear the project for occupancy permits. Receipts must clearly identify the amount of waste disposed and Construction and Demolition (C&D) materials recycled. Completion of Form C, “Waste Reporting Form” of the Construction and Demolition Waste Diversion Program along with the receipts may be sufficient proof of WRP compliance, as determined by the PW Director / City Engineer.
201. Fees and Deposits – Prior to approval of final maps, grading plans, improvement plans, issuance of building permits, and/or issuance of certificate of occupancy, the developer/property owner shall pay all fees, deposits as applicable. These shall include the regional Transportation Uniform Mitigation Fee (TUMF), , Development Impact Fees (DIF), and any applicable Road and Bridge Benefit District (RBBD) Fee. Said fees and deposits shall be collected at the rate in effect at the time of collection as specified in current City resolutions and ordinances.
202. Road Bridge Benefit District –The city is in the process of creating a Road and Bridge Benefit District in the Area. The applicant shall pay the RBBD fees based on the designated land use and areas, prior to the issuance of a building permit, or enter into an RBBD credit Agreement with the City for qualifying improvements. Should the project proponent choose to defer the time of payment, a written request shall be submitted to the City, deferring said payment from the time of issuance of a building permit to issuance of a certificate of occupancy. Fees which are deferred shall be based upon the fee schedule in effect at the time of issuance of the permit of each parcel. If the owner / developer constructs RBBD eligible improvements through another project that exceed its RBBD obligation, those credits, at the approval of the Public Works Director / City Engineer, could be applied to other projects that the owner / developer is constructing via agreement. 203. TUMF Fees - Prior to the issuance of an occupancy permit, the developer/property owner shall pay the Transportation Uniform Mitigation Fee (TUMF) in accordance with the fee schedule in effect at the time of (building permit or certificate of occupancy) issuance, pursuant to adopted City Ordinance governing the TUMF program, unless otherwise stated where a three party agreement is executed between WRCOG, the City of Menifee, and the developer / property owner precluding property owner from paying TUMF Fees. 204. Area Drainage Plan (ADP) Fees. The proposed development is located within the bounds of the Homeland / Romoland ADP of the Riverside County Flood Control and Water Conservation District (Flood Control District), for which drainage fees have been established by the Riverside County Board of Supervisors. Applicable ADP fees will be due (in accordance with the Rules and Regulations for Administration of Area Drainage Plans) prior 4 9
1 6
3 to building permits for this project. The fee due will be based on the fee in effect at the time of payment. The developer acknowledges that if the estimated cost for required MDP / ADP facilities exceeds the required ADP fees and the developer wishes to receive credit for reimbursement in excess of his fees, the facilities will be constructed as a public works contract.
205. Fees and Deposits – Prior to approval of final maps, grading plans, improvement plans, issuance of building permits, and/or issuance of certificate of occupancy, the developer/property owner shall pay all fees, deposits as applicable. These shall include the regional Transportation Uniform Mitigation Fee (TUMF), any applicable Traffic Signal Mitigation Fees, Development Impact Fees (DIF), and any applicable Road and Bridge Benefit District (RBBD) Fee. Said fees and deposits shall be collected at the rate in effect at the time of collection as specified in current City resolutions and ordinances. 4 9
1 6
3 Section III:

Building and Safety Department
Conditions of Approval
4 9
1 6
3 General Requirements
206. Final Building & Safety Conditions. Final Building & Safety Conditions will be addressed when building construction plans are submitted to Building & Safety for review. These conditions will be based on occupancy, use, the California Building Code (CBC), and related codes which are enforced at the time of building plan submittal. 207. Compliance with Code. All Design components shall comply with applicable provisions of the 2022 edition of the California Building, Plumbing and Mechanical Codes; 2022 California Electrical Code; California Administrative Code, 2022 California Energy Codes, 2022 California Green Building Standards, and City of Menifee Municipal Code, 2022 California Fire Code.
208. Disabled Access. Applicant shall provide details of all applicable disabled access provisions and building setbacks on plans to include:
a. Disabled access from the public way to the main entrance of the building. b. Van accessible and standard accessible parking located as close as possible to the main entrance of the building.
c. Accessible path-of-travel from parking to the furthest point of improvement. d. Accessible path-of-travel from public right-of-way to the main entrance of the structure.
e. Interior and Exterior disabled access requirements and details as required by California Building Code Chapter 11B.
209. California Green Building Code Requirements. Electric Vehicle (EV) a. Construction to provide electric vehicle infrastructure and facilitate electric vehicle charging shall comply with Section 5.106.5.3.1 and shall be provided in accordance with regulations in the California Building Code and the California Electrical Code. b. EV capable spaces shall be provided in accordance with Table 5.106.5.3.1 c. The plans shall clearly indicate the location and total amount of future medium and heavy-duty electric vehicle (EV) parking stalls within the site if the building site includes one or more of the following uses: Warehousing, grocery store, retail store with off- street loading areas.
210. County of Riverside Mount Palomar Ordinance. Applicant shall submit, at the time of plan review, a complete exterior site lighting plan with a “photometric study” showing compliance with County of Riverside Mount Palomar Ordinance Number 655 for the regulation of light pollution. All streetlights and other outdoor lighting shall be shown on electrical plans submitted to the Building & Safety Department. Any outside lighting shall be hooded and aimed not to shine directly upon adjoining property or public rights-of-way. All exterior LED light fixtures shall be 3,000 kelvin and below.
211. Street Name Addressing. Applicant must obtain street name addressing for all proposed buildings by requesting street name addressing and submitting a site plan for commercial, residential/tract, or multi-family residential projects. 212. Obtain Approvals Prior to Construction. Applicant must obtain all building plans and permit approvals prior to commencement of any construction work. 4 9
1 6
3 213. Obtaining Separate Approvals and Permits. Temporary construction/sales trailers, temporary power poles/generators, trash enclosures, patio covers, light standards, building and monument signage, and any block walls will require separate approvals and permits.

Solid covers are required over new and existing trash enclosures. 214. Sanitary Sewer and Domestic Water Plan Approvals. On-site sanitary sewer and domestic water plans will require separate approvals and permits from Building and Safety. A total of 6 sets shall be submitted.
215. Demolition. (If applicable) Demolition permits require separate approvals and permits.

AQMD notification and approval may be required.
216. Hours of Construction. Signage shall be prominently posted at the entrance of the project indicating the hours or construction, as allowed by the City of Menifee Municipal Ordinance

8.01.010, for any site within one-quarter mile of an occupied residence. The permitted hours of construction are Monday through Saturday 6:30am to 7:00pm. No work is permitted on Sundays and nationally recognized holidays unless approval is obtained from the City Building Official or City Engineer.
217. House Electrical Meter. Provide a house electrical meter to provide power for the operation of exterior lighting, irrigation pedestals and fire alarm systems for each building on the site.

Developments with single user buildings shall clearly show on the plans how the operation of exterior lighting and fire alarm systems when a house meter is not specifically proposed.

At Plan Review Submittal
218. Submit one (1) digital complete set of fully dimensioned Structural, Architectural, Plumbing, Mechanical and Electrical Plans, along with one (1) digital set of geotechnical reports and one (1) digital set of precise grade plans. Hard copy plans will not be accepted.

All plans shall be submitted at a digital equivalent minimum 24” x 36” General Requirements
All sheets of the plans and the first sheet of the calculations are required to be signed by the licensed architect or engineer responsible for the plan preparation. (Business & Professions Code 5802), (Business & Professions Code 5536.1, 5802, & 6735) Cover Sheet

1. Vicinity Map

2. Parcel number and Site Address

3. Business Name

4. Occupancy Type

5. Occupant Load

6. Type of Construction

7. Number of stories

8. Building Height

9. Floor Area in sq. ft.
4 9
1 6
3 10. Building data: Building Type of Construction, Square Feet of leased area intended use/occupancy, occupant loads, Building Code Data: 2022 California Building Code, 2022 California Electrical Code, 2022 California Mechanical Code, 2022 California Plumbing Code, 2022 California Green Building Code, 2022 California Energy Code, and 2022 California Fire Code.

11. List any flammable/combustible materials, chemicals, toxic, or hazardous materials used or stored and total quantities or each, including MSDS reports.

12. Indicate if the building has a fire sprinkler system.

13. Sheet Index
Plot Plans

14. North Arrow

15. Property Lines/Easements

16. Street/Alleys

17. Clearly dimension building setbacks from property lines, street centerlines, and from all adjacent buildings and structures on the site plan.

18. Accessible parking/unload areas, curb ramps, exterior route of travel to the leased area entry door and at least one route to the public right-of-way.

19. Precise grading plans indicating surface grades, locations and details for all accessible walkways, parking stalls, access aisles, ramps, etc…
Floor Plans

20. All wall lines to be indicated by double line.

21. Fully dimensioned and to scale (3/16 inch per foot minimum)

22. Exit door locations, widths, and direction of door swing.

23. Wall legend. Show walls as existing or new, with references to wall construction details indicating heights, framing member size, spacing and material type, connections at top and bottom and top of wall lateral bracing method.

24. Show all fixed elements of construction e.g., bathroom facilities, fixtures, cabinets, storage racks and/or shelves.

25. Accessible features e.g., fixed customer service counters, including kitchen, dining, or drinking bar counters, new bathroom facilities, access to new areas, features and elements.

Reflected Ceiling Plans

26. Indicate the ceiling treatment, ceiling grid, and the placement of all light fixtures.

Section Views

27. Walls and roof/ceiling finishes, complete occupancy separation and fire resistive construction if required, demising walls etc. For new conditioned spaces, section views shall indicate wall heights and insulation locations for walls and roof/ceilings.

Plumbing/Mechanical Plans

28. System material types and sizes, waste/vent and potable water layouts or isometrics, plumbing fixture schedule, etc.
4 9
1 6
3 29. HVAC equipment location, distribution layout, material type and sizes fire/smoke control devices and activation.

30. Include a line of site detail showing new roof top equipment shielding.

31. Gas line diagram, material type, sizes, and load demand.

Electrical Plans

32. Interior Main Distribution single line diagram, panel location/schedule, and load calculations, etc.

33. Electric power and lighting plans, interior fixture schedule, illuminated exit signs and emergency illumination.

34. Title 24 Energy Electrical requirements including multi-level switching arrangements and automatic electrical lighting shut-off system.

Structural Plan/Foundation/Floor/Ceiling/Roof Plan and Details

35. Structural design justification of the existing roof framing for new mechanical equipment exceeding 300lbs.

36. Foundation supporting elements and connections, reinforcement, slab, and footing details, etc.

37. Structural frame plan(s).

38. T-Bar ceiling standard details and seismic restraints.

Supplemental Information

39. Submittal to include one (1) digital set of original shell building Title 24 Energy Calculations or new Title 24 Energy calculations or Energy calculations as for newly constructed conditioned space.

40. Envelope or Mechanical for conditioned space as new construction or, as for an addition including, LTG (lighting) Energy calculations for new lighting with required forms copied to the full-size plan sheets.

41. Separate submittals and permits are required for signs. Planning approval required prior to submittal to Building & Safety.

42. Fees are based on the City of Menifee Adopted Fee Schedule.

43. Restaurant/Food establishments must obtain approval from the County Health Department/Food Division, and the local water/sewer purveyor for grease waste interceptors.

44. All contractors/sub-contractors must show proof of State and City licenses and shall comply with SEC. 3800 of the Labor Code regarding Workers Compensation.

45. Applicant shall obtain all required clearances and/or approvals from Planning, Engineering, Fire, and the appropriate water district(s) prior to issuance of any building permits.

Prior to Issuance of Building Permits
219. All associated Building Fees to be paid.
220. Each Department is required to Approve, with a signature.

Prior to Final Inspection
4 9
1 6
3 Each department that has conditions shall have completed and approved their final inspection prior to requesting the final inspection by the Building and Safety Department.

Prior to Certificate of Occupancy
221. The Business shall obtain a final inspection from all city departments and any other outside agency final inspections.
222. Each department is required to review and approve with a signature on the request for Commercial Occupancy form once ALL Conditions of Approval have been Met/Approved.

The Request for Commercial Occupancy form is available on the City of Menifee website at https://www.cityofmenifee.us/DocumentCenter/View/14362/Request-for-Commercial- Permit-Issuance
You will be required to obtain the signatures in person at the City of Menifee City Hall. 223. The business shall obtain a City of Menifee business license after the Certificate of Occupancy has been issued. Information about the city business license may be found here https://www.cityofmenifee.us/309/Business-License
A business shall not be open to the public or operate without a city business license or a Certificate of Occupancy.
4 9
1 6
3 Section IV:

Office of the Fire Marshal
Conditions of Approval
4 9
1 6
3 It is the responsibility of the recipient of these Fire Department conditions to forward then to all interested parties. The permit number (as it is noted above) is required on all correspondence.

Additional information is available at our website: www.rvcfire.org Questions should be directed to the Riverside County Fire Department, Office of the Fire Marshal at City of Menifee 29714 Haun Rd., Menifee, CA 92586. Phone (951)723-3767

CONDITIONS
224. Surface Load and Capabilities - Fire apparatus access roads shall be designed to support the impose loads of fire apparatus [80,000 pound live load (gross vehicular weight) distributed over two axles] and shall be surfaced so as to provide all-weather driving capabilities [rear wheel drive apparatus] for the length and grade(s) of the fire apparatus access road.
225. Aerial Fire Apparatus Access Roads - Where the vertical distance between grade plane and the highest roof surface exceeds 30 feet, approved aerial fire apparatus access roads shall be provided. Aerial fire apparatus access roads shall have unobstructed width of 26 feet, exclusive of shoulders, in the immediate vicinity of the building or portion thereof, with an unobstructed vertical clearance of 13 feet 6 inches. 226. Gates - Gate entrances shall be at least two feet wider than the width of the traffic lanes serving the gate. Any gate providing access from a road to a driveway shall be located at least 35 feet setback from the roadway and shall open to allow a vehicle to stop without obstructing traffic on the road. Where a one-way road with a single traffic lane provides access to a gate entrance, a 38 feet turning radius shall be used. 227. Auto Gates - Gates shall be automatic minimum 24 feet in width. Gate access shall be equipped with a rapid entry system to include OPTICOM and Knox Electric switches. Plan shall be submitted to the Fire Department for approval prior to installation. Automatic/manual gate pins shall be rated with shear pin force, not to exceed 30 pounds. Automatic gates shall be equipped with emergency backup power. Gates activated by the rapid entry system shall remain open until closed by the rapid entry system.
228. Fire Department Access - Fire apparatus access roads shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. 229. Sprinkler System - Buildings or structures exceeding 3600 sq. ft are required to have approved CFC and NFPA 13 compliant fire sprinkler systems installed. 230. Building Access - Shall comply per Table 3206.2 California Fire Code, fir-e apparatus access roads in accordance with Section 503 shall be provided within 150 feet of all portions of the exterior walls of buildings used for high pile storage. 231. Access Doors - Where building access is required by Table 3206.2, fire department access doors shall be provided in accordance with this section. Access doors shall be accessible without the use of a ladder.
4 9
1 6
3 232. Number of Doors Required - The required access doors shall be distributed such that the lineal distance between adjacent fire department access doors does not exceed 125 feet measured center to center.
233. Smoke and Heat Removal - Where smoke and heat removal is required by Table 3206.2 it shall be in accordance with Section 910.
234. Additional Required Hydrants - Where new water mains are extended along streets where hydrants are not needed for protection of structures or similar fire problems, fire hydrants shall be provided at spacing not to exceed 1,000 feet to provide for transportation hazards. (TRANSPORTATION HYDRANTS OFF SITE)
235. Minimum Required Fire Flow - The Fire Department is required to set a minimum fire flow for the remodel or construction of all commercial buildings in accordance with Ordinance 787 and the California Fire Code
236. Blue Dot Reflectors - Blue retro-reflective pavement markers shall be mounted on private streets, public streets and driveways to indicate location of fire hydrants. Prior to installation, placements of markers must be approved by the Riverside County Fire Department. 237. Minimum Required Fire Flow - The Fire Department is required to set a minimum fire flow for the remodel or construction of all commercial buildings in accordance with Ordinance 787 and the California Fire Code. A fire flow of 8000 gpm for a 4 hour duration at 20 psi residual operating pressure must be available before any combustible material is placed on the job site. A minimum number of 8 Super fire hydrant(s) (6”x4”x2½”x2½”) shall be provided for this project. Additional fire hydrants may be required to meet the spacing requirements of the California Fire Code.
238. On/Off Looped FHA - Combination of on-site and off-site super fire hydrants (6”x4”x2½”x2½”) on a looped system shall be provided spaced an average of 200 feet between fire hydrants and in no case shall fire hydrants be further than120 feet from any portion of on a street or road frontage as measured along approved vehicular travel ways.

Fire hydrant(s) shall be located so that no portion of the building is farther than 250 feet from any hydrant(s) as measured along approved vehicular travel ways. The required fire flow shall be available from any adjacent hydrant(s) in the system. 4 9
1 6
3 Section V:

Riverside County Environmental Health
Conditions of Approval
4 9
1 6
3 4
9 1
6 3

4 9
1 6
3 The undersigned warrants that he/she is an authorized representative of the project referenced above, that I am specifically authorized to consent to all of the foregoing conditions, and that I so consent as of the date set out below. _______________________________________________ ___________________ Signed Date
_______________________________________________ ___________________ Name (please print) Title (please print)

NOTICE OF PUBLIC HEARING
AND

NOTICE OF AVAILABILITY OF A FINAL ENVIRONMENTAL IMPACT REPORT

TIME OF HEARING: October 23, 2024
DATE OF HEARING: 6:00PM, or as soon thereafter as possible PLACE OF HEARING: MENIFEE CITY COUNCIL CHAMBERS
29844 Haun Road, Menifee, CA 92586

A PUBLIC HEARING has been scheduled, pursuant to the City of Menifee Municipal Code, before the CITY OF MENIFEE PLANNING COMMISSION to consider the project shown below:

Project Title: “Murrieta Road Warehouse Project” – Plot Plan No. PLN 22-0179 – Environmental Impact Report (EIR) (State Clearinghouse Number #2023110162.)

Project Location: The Project is generally located south of Floyd Avenue, east of Geary Street, west of Murrieta Road, and north of McLaughlin Road within the City of Menifee (City), County of Riverside, State of California (Assessor Parcel Numbers [APNs]: 330-210-010, -011, -013, and -062, 330-560-001 through 330-560-040, 330- 570-001 through 330-570-033, and 330-571-001 through 330-571-005).

The Planning Commission will consider whether to approve of the following project at a public hearing:

Plot Plan No. No. PLN 22-0179 includes development of an approximately 517,720-square-foot (SF) speculative warehouse building. The environmental analysis includes a development buffer to account for final design changes, equivalent to three percent of the building square footage, or 15,532 SF, which would result in a building area of 533,252 SF and a floor area ratio of 0.50. The 533,252 SF warehouse building would include approximately 20,320 SF of ground floor office space, 7,000 SF of mezzanine office space, and 505,932 SF of warehouse space, and would be approximately 55 feet tall. Additional improvements include a parking lot and loading docks, ornamental landscaping, associated onsite infrastructure, and construction of offsite street improvements.

The Project would include 90 dock-high doors and 4 grade-level truck doors. Approximately 128 trailer parking spaces would be provided in the northern truck court and 64 trailer parking spaces would be provided in the southern truck court, within areas secured by sliding gates. The proposed Project would also provide 409 passenger car parking spaces. Access to the proposed Project would be provided via two driveways from Geary Street and three driveways from Murrieta Road.

The Project would also include approximately 137,363 SF of ornamental landscaping that would cover 11.0 percent of the site. The proposed Project includes an approximately 14-foot-high retaining and screen wall along the interior of the northern and southern truck courts (outside facing wall would be 8 feet high with a landscaping berm), which would taper to a 6-foot-high screen wall along the northern property line outside of the truck court.

The Project would include approximately 4.5 acres (approximately 1.5 linear miles) of construction improvements in the form of roadway and utility improvements.

Environmental Information: On May 24, 2024, a Notice of Availability of the Draft EIR was sent to Responsible and Trustee Agencies and mailed to surrounding property owners and non- owner residents within 500 feet of the project site, stating that copies of the Draft EIR were available for public review on the City’s website, at the City of Menifee City Hall, the Sun City Library and Menifee Library. The public review period was for the State - mandated 45 days, from May 24, 2024, through July 8, 2024. Analysis presented in the Draft EIR indicated the proposed project would have certain significant and unavoidable greenhouse gas and noise impacts. The Draft EIR also presented mitigation measures, which will reduce project -specific and cumulative impacts. All other environmental effects evaluated in the D raft EIR are considered less than significant or can be successfully mitigated below the applicable significance thresholds.

The Final Environmental Impact Report (FEIR) responds to the comments and includes text revisions to the Draft EIR in response to input received on the Draft EIR. Unlike the Draft EIR, the City is not required to respond to comments on the FEIR. If written comments are received, they will be provided to the Planning Commission as part of the staff report for the Project. The Draft EIR and FEIR will be submitted to the Planning Commission for requested certification and action on the Project.

The FEIR is available on the City of Menifee Community Development Department website:
https://www.cityofmenifee.us/325/Environmental-Notices-Documents. A hard copy of the FEIR can be viewed at: Menifee City Hall – 29844 Haun Road, Menifee, CA 92586.

The Project site is not included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 (California Department of Toxic Substances Control list of various hazardous sites).

Any person wishing to comment on the proposed Project may do so in writing between the date of this notice and the public hearing and be heard at the time and place noted above. All comments must be received prior to the time of the public hearing. All such comments will be submitted to the Planning Commission, and the Planning Commission will consider such comments, in addition to any oral testimony, before making a decision on the proposed Project.

If this Project is challenged in court, the issues may be limited to those raised at the public hearing, described in this notice, or in written correspondence delivered to the Planning Commission at, or prior to, the public hearing. Be advised that as a result of public hearings and comments , the Planning Commission may amend, in whole or in part, the proposed Project. Accordingly, the designations, development standards, design or improvements, or any properties or lands within the boundaries of the proposed Project, may be changed in a way other than specifically proposed.

For further information regarding this project or to provide written correspondence, please contact Ryan Fowler at (951) 723-3740 or e-mail [email protected].

CITY OF MENIFEE COMMUNITY DEVELOPMENT DEPARTMENT
Attn: Ryan Fowler, Principal Planner