CONTRACT CHANGE ORDER NO 3 Page 1 o f 2
P.O. #: 24100102
DESCRIPTION OF CHANGES AND/OR EXTRA WORK:

ITEM U/M QUANTITY % CHANGE UNIT PRICE TOTAL

0.00 0 0.0000 -$ -$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
TOTAL ESTIMATED PRICE FOR THIS CHANGE ORDER: -$
JUSTIFICATION: (Be specific on each item. Attach supporting documents as necessary) 71 ADDITIONAL WORKING DAYS WILL BE GRANTED TO CONTRACTOR DUE TO:

DESCRIPTION
Time Extension
CIP No. 19-15
Optima RPM
This document shall become an amendment to the Contract and all provisions of the Contract will apply hereto. This Change Order constitutes a complete and final resolution of all claims of the Contract for additional time or additional compensation related to or affected by work that is the subject of this Change Order. Quantities of items other than Lump Sum are not to exceed the amounts indicated.
2/19/2025DATE:

PROJECT NAME:

PROJECT NO:

CONTRACTOR:

Central Park Amphitheater
The Contractor is hereby directed to make the herein described changes from the plans and specifications and/or perform the following described work not included in the Plans and Specifications for this project. Work items shall include labor, materials, neccesary for the performance and completion of the additional work.equipment, traffic control, and incidentals.

The availability and production of the Glu Lam beams for both the Shade Structure and Storage Structure have long lead times which are not achievable with original
project schedule completion date of February 19, 2025. Completion date will be moved to June 2, 2025. No additional
compensation will take place due to the extension of this change order.

A
ttached to this docu ment i s all backup provided by the contractor. \\MCH-FPSRV-01\CommunityServices\2020 New J Drive\CIP\_Active CIP\CIP 19-15, Central Park Amphitheatre\Change Order - Optima\COR #3\CIP 19-15 Change Order No. 3 Docusign Envelope ID: 122484BC-D7F0-4A08-8D7B-35628724F589

Page 2 of 2 ends

PREVIOUS
CCO # Amount % Additional Time Date Approved
1 25,166.00$ 0.49% 0 8/12/2024
2 9,329.76$ 0.18% 0 10/13/2024

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%
Totals 34,495.76$ 0.67% 0

CURRENT
CCO # Amount % Additional Time Date Approved
3 -$ 0.00% 71 2/19/2025
34,495.76$ 71
Februay 19, 2025
71 June 2, 2025
AUT
HORIZATION BY CITY:

Recommended for approval by:

Date: __________ ____________________________________ Date: __________ Bryce Howell, Park/Landscape Maintenance Manager Cyrus Shahinpar/Southstar Engineering, Resident Engineer Ap
proved by:

Dat
e: __________ D
ate: ______________________________________________
Armando G. Villa, City Manager
A
CCEPTANCE BY CONTRACTOR:

Accepted by: __________________________________ Date: ____________________________ Signature
_____________________________________________________
Please print name and title
Change PVC Conduit to Rigid Conduit
We, the undersigned Contractor, have given careful consideration to the above described changes and/or extra work and hereby agree that said work is a supplement to the contract and all provisions will apply hereto.

Date Started:

Original Completion Date:

Additional Time (Working Days)
____________________________
Rebekah Kramer, Deputy City Manager
5,133,426.31$
____________________________
Time Extension
-$
5,167,922.07$
Changes to Temporary power system

CONTRACT VARIANCE SUMMARY
Current Change Order Amount:

TOTAL ALL CCOs
34,495.76$
Revised Completion Date:

Description
Previous Change Order Amounts:

Description
Revised Contract Amount:

Original Contract Amount:
\\MCH-FPSRV-01\CommunityServices\2020 New J Drive\CIP\_Active CIP\CIP 19-15, Central Park Amphitheatre\Change Order - Optima\COR #3\CIP 19-15 Change Order No. 3 Docusign Envelope ID: 122484BC-D7F0-4A08-8D7B-35628724F589 Maykel A Hanna , VP
3/10/2025
10/25/2024
Ci
ty of Menifee – Amphitheater Project
CC
O # 3 – Time extension due to manufacturing delay
Bryce,
Listed below is a description of Change Order for extension of time for the Project.

As discussed in weekly meetings, the availability and production of the Glu Lam beams for both the Shade Structure and Storage Structure have long lead times which are not achievable with original project schedule completion date of February 19, 2024. During a meeting on May 14, 2024, the schedule for Glu Lam beam submittal and production was discussed and agreed that an extension of time was acceptable to June 2, 2025 and nothing further beyond that point.

This Contract Change Order will change the original completion date of February 19, 2025 to June 2, 2025 adding 71 days to working days due to this unforeseen condition. There will be no extension of overhead, mobilization or down time charged to the City due to this extension since it was not caused by the City.

This is a no cost Change Order and no additional compensation will be allowed for anything related to the extension of time within this Change Order.

Ca
rl Short, Assistant Resident Engineer/Office Engineer