3 of 9
the power of sale of the real property, all buildings and improvements thereon, or that may be erected upon or made thereto, together with all hereditaments and appurtenances thereunto belonging, or in any wise appertaining, and the reservations, remainders, rents, issues, and profits thereof. The collateral value of the property shall be established at Subdivider's expense through an appraisal approved by City.
6) An instrument of credit from an agency of the state, federal or local government, when any agency of the state, federal, or local government provides at least twenty percent (20%) of the financing for the Improvements.
7) When Subdivider is a non -profit organization, security may be negotiable bonds, of the kind approved for securing deposits of public moneys with City or in favor of City, as specified in Section 16430 of the California Government Code, deposited, at City's option, with City or a responsible escrow agent or trust company.
C. All securities shall be furnished in accordance with the provisions of Exhibit A. The amount of the performance security shall equal one hundred percent (100%) of the estimated cost of constructing the Improvements, as estimated by the City Engineer or a duly authorized representative of the City Engineer. The amount of Payment security shall equal one hundred percent (100%) of the estimated cost of construction, except as otherwise set forth in Exhibit A, and shall be furnished as a separate security. Warranty security shall equal Ten Percent (10%) of the amount of performance security except as otherwise set forth in Exhibit A. The securities required by this Agreement shall be kept on file with the City Clerk. The terms of the security documents specified in this Agreement are incorporated into this Agreement by this reference. If any security is replaced by another approved security, the replacement shall be filed with the City Clerk and, upon filing, shall be deemed to have been made a part of and incorporated into this Agreement. Upon filing of a replacement security with the City Clerk, the former security may be released. The City Engineer shall approve replacement of security.
D. At the time of submittal of security, Subdivider shall pay to City administrative fees applicable to the form of security provided in accordance with the current City of Menifee Fee Schedules.
E. Security shall not expire, be reduced , or become wholly or partially invalid for any reason, including non-payment of premiums, modifications of this Agreement and/or expiration of the time for performance stated in this Agreement.
F. Security shall be released in the following manner:
1) Performance security shall be released upon the final completion and acceptance or approval, by the City Council of the Improvements subject to the provisions of Section 10 of this Agreement.
2) The City Engineer may authorize a one-time 50% reduction of performance security as work progresses, upon application by Subdivider. In no event shall security be reduced below that required to guarantee the completion of the act or work or obligation secured, plus Ten Percent (10%).
3) If City receives no notice of recorded claims of lien, labor and materials security shall be released in full 90 days after final acceptance and/or approval by the City Council, of the Improvements. If City receives notice of any recorded lien, the provisions of the Subdivision Map Act shall apply.
4) No security given for the guarantee or warranty of work shall be released until the expiration of the warranty period and until any claims filed during the warranty period have been settled.
As provided in paragraph 13 of this Agreement, the warranty period shall not commence until final acceptance of all the work and improvements by the City pursuant to Paragraph 10.
Warranty security not utilized during the warranty period shall be released one year after final acceptance or approval by the City Counc il of all Improvements upon application by the Subdivider. However, if at the end of the one -year warranty period, there are one or more outstanding requests by City for performance of work or provision of materials under the
PARCEL MAP OR TRACT MAP NO. DATE: 2/18/2025
IP:
IMPROVEMENTS
Street/Drainage $ 1,164,497.19 $ $
*Flood Control $ 0.00 $ $
Dom Wtr EMWD $ 376,790.40 $ $
Rec Wtr EMWD $ 0.00 $ $
Sewer EMWD $ 326,527.20 $ $
Total 1,867,814.79 $ $
Warranty Retention (10%) $
Construction items and their quantities, as shown on the attached sheets, are accurate for the improvements required to construct the above project and the mathmatical extensions, using City's unit costs, are accurate for determining bonding costs
Above amounts do G do not G include additional 20% for recordation prior to having signed plans (Ordinance460, Section 10.3E).
2/18/2025
Signature Date
Michael Brendecke 83363 3/23/2025
Name Typed or printed RCE# Exp. Date
Civil Engineer's Stamp
*Flood Control Construction Cost Estimate to be provided by Flood Control District. Provide a copy of Flood Control District letter stating cost estmate.
1. Quantities are to be taken from the Improvement Plans. Unit cost are to be as provided on "City of Menifee Improvement Requirement Worksheet."
2. Show Performance Bond Amounts to the nearest $500.00. Material and Labor Bond Amounts are 50% of Performance Bond Amountss. **100% for Flood Control items.
3. For Construction items not covered by "The City of Menifee Improvement Requirements Worksheet", Design Engineer is to provide his opinion of construction cost and use that cost. If City of Menifee Unit Costs are determined to be too low, in the opinion of the design engineer, the higher costs as provided by the Design Engineer should be used.
1,868,000.00 1,868,000.00
186,800.00
DESIGN ENGINEER'S CALCULATION OF IMPROVEMENT BONDING COSTS *** PLEASE READ INSTRUCTIONS BELOW ***
377,000.00 377,000.00
0.00 0.00
326,500.00 326,500.00
Construction Costs) Construction Costs)
1,164,500.00 1,164,500.00
0.00 0.00
FAITHFUL PERFORMANCE MATERIAL & LABOR
SECURITY SECURITY
(100% of Estimated (**100% of Estimated
18-022
CITY OF MENIFEE ENGINEERING DEPARTMENT
CONSTRUCTION COST WORKSHEET
TR 36658
Approved for bonding
2/18/25
A. Backlund
CITY OF MENIFEE ENGINEERING DEPARTMENT
IMPROVEMENT REQUIREMENT WORKSHEET
STREET AND DRAINAGE IMPROVEMENTS
UNIT
ROADWAY SECTION 1 Area = S.F.
Excavation
Cut (c) = C.Y.
Road area and side slopes to daylightFill (f) = C.Y.
C.Y. $ 0.40 $ 0.00
C.Y. $ 1.10 $ 0.00
C.Y. $ 2.80 $ 0.00
TON $ 90.00 $ 251,640.00
Thickness in Feet (0.33' min.) =
C.Y. $ 50.00 $ 109,000.00
Thickness in Feet =
Ton $ 600.00 $ 0.00
ROADWAY SECTION 2 Area = S.F.
Excavation
2. Projects without a Grading Plan: Cut (c) = C.Y.
Road area and side slopes to daylightFill (f) = C.Y.
C.Y. $ 0.40 $ 0.00
C.Y. $ 1.10 $ 0.00
C.Y. $ 2.80 $ 0.00
TON $ 90.00 $ 0.00
Thickness in Feet (0.33' min.) =
C.Y. $ 50.00 $ 0.00
Thickness in Feet =
Ton $ 600.00 $ 0.00
ROADWAY SECTION 3 Area = S.F.
Excavation
2. Projects without a Grading Plan: Cut (c) = C.Y.
Fill (f) = C.Y.
C.Y. $ 0.40 $ 0.00
C.Y. $ 1.10 $ 0.00
C.Y. $ 2.80 $ 0.00
TON $ 90.00 $ 0.00
Thickness in Feet (0.33' min.) =
C.Y. $ 50.00 $ 0.00
Thickness in Feet =
Ton $ 600.00 $ 0.00
L.F. $ 1.00 $ 0.00
S.F. $ 0.50 $ 0.00
0.5 Asphalt Emulsion (Fog Seal/Paint Binder)
(1 ton = 240 gals)
-
Sawcut Exist. A.C. Pavement
Cold Plane A.C. Pavement
(c.) Import and Fill -
Asphalt Concrete (144 lbs/cu.ft) -
0.39 Agg Base Class II -
(a.) Excavate and Fill -
(b.) Excavate and Export -
C.Y. $ 25.00 $ 0.00 Area x 0.50' (hinge point to hinge point)
0.5 Asphalt Emulsion (Fog Seal/Paint Binder)
(1 ton = 240 gals)
-
1. Projects with Grading Plan for Roadway
(c.) Import and Fill -
Asphalt Concrete (144 lbs/cu.ft) -
0.39 Agg Base Class II -
(a.) Excavate and Fill -
(b.) Excavate and Export -
C.Y. $ 25.00 $ 0.00 Area x 0.50' (hinge point to hinge point)
0.5 Asphalt Emulsion (Fog Seal/Paint Binder)
(1 ton = 240 gals)
1. Projects with Grading Plan for Roadway
Asphalt Concrete (144 lbs/cu.ft) 2,796
0.33 Agg Base Class II 2,180
If balance, provide (a.) only, either cut or fill
If export, provide (a.)&(b.) a = fill, b = cut - fill
If import, provide (a)&(c), a = cut, c = fill - cut
(Unit costs for (a),(b), & (c) are 20% of actual
costs to assure that work will be corrected to
eliminate hazardous conditions.)
(a.) Excavate and Fill -
(b.) Excavate and Export -
2. Projects without a Grading Plan
1. Projects with Grading Plan for Roadway
C.Y. $
(c.) Import and Fill -
ITEM QUANTITY UNIT AMOUNT
COST
25.00 $ 0.00 Area x 0.50' (hinge point to hinge point) S.Y. $ 0.60 $ 0.00
S.Y. $ 8.00 $ 0.00
L.F. $ 18.00 $ 0.00
L.F. $ 3.00 $ 0.00
L.F. $ 7.50 $ 0.00
L.F. $ 10.00 $ 0.00
EA. $ 250.00 $ 0.00
S.F. $ 0.90 $ 0.00
L.F. $ 14.00 $ 90,902.00
L.F. $ 16.00 $ 0.00
L.F. $ 12.00 $ 6,096.00
L.F. $ 10.00 $ 0.00
L.F. $ 15.00 $ 0.00
L.F. $ 8.00 $ 0.00
L.F. $ 10.00 $ 0.00
S.F. $ 10.00 $ 25,890.00
S.F. $ 6.00 $ 179,706.00
S.F. $ 8.00 $ 103,776.00
S.F. $ 6.00 $ 0.00
EA. $ 1,500.00 $ 12,000.00
EA. $ 2,500.00 $ 0.00
L.F. $ 100.00 $ 0.00
L.F. $ 35.00 $ 0.00
L.F. $ 10.00 $ 32,570.00
L.F. $ 15.00 $ 0.00
L.F. $ 12.00 $ 0.00
EA. $ 1,000.00 $ 0.00
EA. $ 10,000.00 $ 0.00
EA. $ 5,000.00 $ 95,000.00
EA. $ 150.00 $ 0.00
EA. $ 400.00 $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
S.F. $ 4.00 $ 0.00
S.F. $ 10.00 $ 0.00
EA $ 100.00 $ 0.00
S.F. $ 3.50 $ 0.00
C.Y. $ 27.00 $ 0.00
EA $ 7,000.00 $ 0.00
S.F. $ 10,000.00 $ 0.00
EA $ 3,000.00 $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
Remove trees
Landscape Fill Material
Water Meter
Electric Meter
Colored Stamped Concrete
Street Trees ( 15 Gallon )
Landscape and Irrigation
LANDSCAPING
Maintenance Walk STD 113
Adjust MH to Grade ( if no sewer plan )
Relocate Power Pole
Street Lights (including conduit) 19
Adjust Water Valve to Grade ( if no water plan )
Chain Link Fence ( 6' )
Relocate Fence
Pipe Gate
Barricades
Metal Beam Guard Railing
Utility Trench, one side (Edison, Telephone, Cable)
(total length of Streets) 3,257
P.C.C. Dip Section Std. 307
ADA Access Ramp (w/ new construction) 8
ADA Access Ramp (in existing improvements)
P.C.C. Cross Gutter and Spandrels 2,589
P.C.C. Sidewalk 29,951
P.C.C. Driveway Approach 12,972
Type "D" Curb
A.C. Dike (6")(incl. material & labor)
A.C. Dike (8")(incl. material & labor)
Curb and Gutter (Type A-8)
Type 6A Curb 508
Type "D-1" Curb
Relocate Mailbox
AC overlay (min. 0.10')
Curb and Gutter (Type A-6) 6,493
Remove A.C. Dike
Remove Chain Link Fence
Remove Barricade
Grinding A.C. , in place
Remove A.C. Pavement
Remove Curb and Gutter
$ $ 0.00
EA. $ 200.00 $ 0.00
EA. $ 300.00 $ 0.00
C.Y. $ 400.00 $ 0.00
EA. $ 500.00 $ 0.00
EA $ 2,000.00 $ 0.00
EA $ 2,000.00 $ 0.00
EA $ 2,000.00 $ 0.00
S.F. $ 6.50 $ 0.00
S.F. $ 6.50 $ 0.00
C.Y. $ 400.00 $ 0.00
C.Y. $ 200.00 $ 0.00
C.Y. $ 80.00 $ 0.00
C.Y. $ 90.00 $ 0.00
C.Y. $ 100.00 $ 0.00
C.Y. $ 110.00 $ 0.00
C.Y. $ 100.00 $ 0.00
C.Y. $ 120.00 $ 0.00
C.Y. $ 130.00 $ 0.00
C.Y. $ 140.00 $ 0.00
L.F. $ 113.00 $ 0.00
L.F. $ 132.00 $ 0.00
L.F. $ 153.00 $ 0.00
L.F. $ 178.00 $ 0.00
L.F. $ 204.00 $ 0.00
L.F. $ 235.00 $ 0.00
L.F. $ 40.00 $ 0.00
L.F. $ 50.00 $ 0.00
L.F. $ 60.00 $ 0.00
L.F. $ 70.00 $ 0.00
L.F. $ 80.00 $ 0.00
L.F. $ 100.00 $ 0.00
EA. $ 2,500.00 $ 0.00
EA. $ 4,000.00 $ 0.00
EA. $ 7,500.00 $ 0.00
EA. $ 11,000.00 $ 0.00
EA. $ 14,500.00 $ 0.00
EA. $ 2,500.00 $ 0.00
EA. $ 3,500.00 $ 0.00
EA. $ 4,500.00 $ 0.00
EA. $ 5,000.00 $ 0.00
EA. $ 12,500.00 $ 0.00
EA. $ 12,500.00 $ 0.00
EA. $ 4,500.00 $ 0.00
EA. $ 5,000.00 $ 0.00
EA. $ 6,500.00 $ 0.00
EA. $ 2,700.00 $ 0.00
EA. $ 6,500.00 $ 0.00
C.Y. $ 400.00 $ 0.00
EA. $ 3,500.00 $ 0.00
EA. $ 200.00 $ 0.00
$ $ 0.00
$ $ 0.00
S.F $ 2.50 $ 0.00
L.F. $ 0.21 $ 0.004" Painted Solid Stripes
SIGNING, STRIPING AND SIGNALS
Remove Painted Traffic Stripes and Markings
Structural Reinforcement Concrete
Headwall for 36" or smaller storm drain
Concrete Collar
Manhole No. 2
Manhole No. 3
Manhole No. 4
Transition Structure No. 2
Transition Structure No. 3
Manhole No. 1
Junction Structure No. 2
Junction Structure No. 6
Transition Structure No. 1
Catch Basin W=28'
Inlet Type IX or X
Junction Structure No. 1
Catch Basin W=7'
Catch Basin W=14'
Catch Basin W=21'
42" C.S.P. or HDPE N12
48" C.S.P. or HDPE N12
Catch Basin W=4'
24" C.S.P. or HDPE N12
30" C.S.P. or HDPE N12
36" C.S.P. or HDPE N12
42" R.C.P. round, arch or elliptical
48" R.C.P. round, arch or elliptical
18" C.S.P. or HDPE N12
24" R.C.P. round, arch or elliptical
30" R.C.P. round, arch or elliptical
36" R.C.P. round, arch or elliptical
Grouted Rip Rap ( 1 Ton ) Method B
Grouted Rip Rap ( 2 Ton ) Method B
18" R.C.P. round, arch or elliptical
Rip Rap ( 2 Ton ) Method B
Grouted Rip Rap ( 1/4 Ton ) Method B
Grouted Rip Rap ( 1/2 Ton ) Method B
Rip Rap ( 1/4 Ton ) Methob B ( 1.9 tons /CY)
Rip Rap ( 1/2 Ton ) Method B
Rip Rap ( 1 Ton ) Method B
Interceptor Drain
R.C. Box Culvert (2 - 3'X5' )
Concrete Channel
Flat Outlet Drainage Structure Std 303
Curb Outlet Drainage Structure Std 308
Terrace Drain & Down Drain
Cut Off Wall ( Std 2' )
A. C. Overside Drain
Under Sidewalk Drain Std 309
DRAINAGE
Concrete Bulkhead
Slope Anchors for Pipes
L.F. $ 0.30 $ 0.00
L.F. $ 0.16 $ 0.00
L.F. $ 0.47 $ 0.00
L.F. $ 0.65 $ 0.00
L.F. $ 0.82 $ 0.00
L.F. $ 1.30 $ 0.00
L.F. $ 0.36 $ 0.00
L.F. $ 0.82 $ 0.00
S.F $ 2.70 $ 0.00
S.F $ 2.50 $ 0.00
L.F. $ 0.52 $ 0.00
L.F. $ 0.47 $ 0.00
L.F. $ 0.83 $ 0.00
L.F. $ 0.63 $ 0.00
L.F. $ 0.78 $ 0.00
L.F. $ 0.97 $ 78.57
L.F. $ 1.13 $ 0.00
L.F. $ 2.83 $ 0.00
S.F $ 3.61 $ 454.86
S.F. $ 2.25 $ 0.00
S.F. $ 3.00 $ 0.00
EA. $ 50.00 $ 0.00
EA. $ 100.00 $ 0.00
EA. $ 275.00 $ 1,650.00
EA. $ 150.00 $ 0.00
EA. $ 425.00 $ 0.00
EA. $ 250.00 $ 1,000.00
EA. $ 150.00 $ 0.00
EA. $ 300.00 $ 0.00
EA. $ 60.00 $ 0.00
EA. $ 40.00 $ 0.00
EA. $ 45.00 $ 0.00
EA. $ 3.75 $ 0.00
LS $ 250,000.00 $ 0.00
LS $ 150,000.00 $ 0.00
LS $ 100,000.00 $ 0.00
EA $ 450.00 $ 0.00
EA $ 400.00 $ 0.00
EA $ 500.00 $ 0.00
L.F. $ 25.00 $ 0.00
L.F. $ 30.00 $ 0.00
L.F. $ 35.00 $ 0.00
$ $ 0.00
LS $ 8,000.00 $ 0.00
LS $ 40,000.00 $ 0.00
LS $ 30,000.00 $ 0.00
LS $ 15,000.00 $ 0.00
A. $ 909,763.43
B. Administrative Contingency (20% x A) $ 181,952.69
C. CM - Inspection - LC (8%) $ 72,781.07
D Streets/Drainage Total (A + B) $ 1,164,497.19
Subtotal
Design/submittals/review
Mobilization
Traffic Control
3" PVC Conduit & Fiber Optic Cable
Survey
Install Pull Box (#6)
2" PVC Interconnect Conduit & Cable
3" PVC Interconnect Conduit & Cable
Retrofit of Ex. Traffic Signal & Lighting
6' Round Signal Loops
Install Pull Box (#5)
Pavement Marker, Reflective
New Traffic Signal & Lighting (Major Intersection)
New Traffic Signal & Lighting (Minor Intersection)
Object Marker - Modified Type "F" Delineator
Delineator ( Class 1 Type F)
Delineator ( Class 2 )
Stop Sign & Post 4
Road Sign on existing pole / post (One Post)
Road Sign on existing pole / post (Two Post)
Street Name Sign 6
Install Sign ( Strap and Saddle Bracket Method)
Install Sign (Mast Arm Hanger Method)
Thermoplastic Cross Walk and Pavement Marking
Remove, Sign, Salvage
Relocate Roadside Sign
Thermoplastic Two-Way Left Turn Lane
Thermoplastic Pavement Markings 126 Thermoplastic Channelizing Limit Line and Pavement Marking
8" Thermoplastic Channelizing Line
12" Thermoplastic Crosswalk & Limit Line 81
Thermoplastic One-Way, No Passing
4" Thermoplastic Broken Stripes
4" Thermoplastic Double Solid Stripes
6" Thermoplastic Bike Lane Stripes
Painted Pavement Markings
Remove Thermoplastic Trafffic Stripes and Markings
4" Thermoplastic Solid Stripes
12" Painted Crosswalk & Limit Line
Painted One-Way, No Passing
Painted Two-Way Left Turn Lane
4" Painted Double Solid Stripes
6" Painted Bike Lane Stripes
8" Painted Channelizing Line
4" Painted Solid Stripes (2 Coats )
4" Painted Broken Stripes
UNIT
L.F. $ 25.00 $ 0.00
L.F. $ 30.00 $ 0.00
L.F. $ 35.00 $ 112,770.00
L.F. $ 55.00 $ 0.00
L.F. $ 90.00 $ 0.00
L.F. $ 135.00 $ 0.00
L.F. $ 180.00 $ 0.00
EA. $ 715.00 $ 0.00
EA. $ 830.00 $ 0.00
EA. $ 1,340.00 $ 28,140.00
EA. $ 2,300.00 $ 0.00
EA. $ 6,270.00 $ 0.00
EA. $ 14,300.00 $ 0.00
EA. $ 4,000.00 $ 44,000.00
EA. $ 4,500.00 $ 0.00
EA. $ 3,500.00 $ 0.00
EA. $ 4,000.00 $ 4,000.00
EA. $ 2,400.00 $ 4,800.00
EA. $ 4,000.00 $ 0.00
EA. $ 800.00 $ 59,200.00
EA. $ 2,480.00 $ 0.00
EA. $ 2,780.00 $ 0.00
EA. $ 4,500.00 $ 0.00
EA. $ 200.00 $ 0.00
EA. $ 500.00 $ 1,000.00
EA. $ 2,000.00 $ 0.00
EA. $ 1,000.00 $ 0.00
EA. $ 1,430.00 $ 0.00
EA. $ 1,750.00 $ 0.00
EA. $ 2,200.00 $ 0.00
EA. $ 3,150.00 $ 0.00
EA. $ 250.00 $ 7,750.00
EA. $ 320.00 $ 0.00
$ $ 0.00
A. $ 261,660.00
B. $ 52,332.00
C. $ 313,992.00
D. $ 62,798.40
E. $ 376,790.40
20% x C
Water Total (C + D)
BOND AMOUNT FOR RECORDATION PRIOR
TO HAVING SIGNED PLANS
Subtotal
Administrative Contingency (20% x A)
Water Total (A + B)
12" Miscellaneous Fittings
8" Hot Tap
12" Hot Tap
8" Miscellaneous Fittings 31
1" Hot Tap
4" Hot Tap
6" Hot Tap
Adjust Water Valve to Grade
Removal of Blowoff 2
Join at existing end of 8" pipe
1-1/2" Service Connection (No Meter)
2" Service Connection (No Meter)
4" Service Connection (No Meter)
1" Air and Vacuum Valve. 2
2" Air and Vacuum Valve.
1" Service Connection (With Meter) 74
6" Fire Hydrant (Super)
4" Blowoff
6" Blowoff 1
16" Gate Valve RS
18" Gate Valve RS
6" Fire Hydrant (Standard) 11
6" Gate Valve RS
8" Gate Valve RS 21
12" Gate Valve RS
18" Waterline PVC C-905 DR-18
20" Waterline PVC C-905 DR-18
4" Gate Valve RS
8" Waterline PVC C-900 DR-18 3,222
12" Waterline PVC C-900 DR-18
16" Waterline PVC C-905 DR-18
COST
4" Waterline PVC C-900 DR-18
6" Waterline PVC C-900 DR-18
CITY OF MENIFEE ENGINEERING DEPARTMENT
IMPROVEMENT REQUIREMENT WORKSHEET
DOMESTIC WATER IMPROVEMENTS
ITEM QUANTITY UNIT AMOUNT
CITY OF MENIFEE ENGINEERING DEPARTMENT
IMPROVEMENT REQUIREMENT WORKSHEET
RECYCLED WATER IMPROVEMENTS
UNIT
L.F. $ 25.00 $ 0.00
L.F. $ 30.00 $ 0.00
L.F. $ 35.00 $ 0.00
L.F. $ 55.00 $ 0.00
L.F. $ 90.00 $ 0.00
L.F. $ 135.00 $ 0.00
L.F. $ 180.00 $ 0.00
EA. $ 715.00 $ 0.00
EA. $ 830.00 $ 0.00
EA. $ 1,340.00 $ 0.00
EA. $ 2,300.00 $ 0.00
EA. $ 6,270.00 $ 0.00
EA. $ 14,300.00 $ 0.00
EA. $ 3,500.00 $ 0.00
EA. $ 4,000.00 $ 0.00
EA. $ 2,400.00 $ 0.00
EA. $ 4,000.00 $ 0.00
EA. $ 800.00 $ 0.00
EA. $ 2,480.00 $ 0.00
EA. $ 2,780.00 $ 0.00
EA. $ 4,500.00 $ 0.00
EA. $ 200.00 $ 0.00
EA. $ 500.00 $ 0.00
EA. $ 2,000.00 $ 0.00
EA. $ 1,000.00 $ 0.00
EA. $ 1,430.00 $ 0.00
EA. $ 1,750.00 $ 0.00
EA. $ 2,200.00 $ 0.00
EA. $ 3,150.00 $ 0.00
$ $ 0.00
A. $ 0.00
B. $ 0.00
C. $ 0.00
D. $ 0.00
E. $ 0.00
Subtotal
Administrative Contingency (20% x A)
Water Total (A + B)BOND AMOUNT FOR RECORDATION PRIOR
TO HAVING SIGNED PLAND
20% x C
Water Total (C + D)
8" Hot Tap
12" Hot Tap
1" Hot Tap
4" Hot Tap
6" Hot Tap
Adjust Water Valve to Grade
Removal of Blowoff
Join at existing end of 8" pipe
1-1/2" Service Connection ( No Meter)
2" Service Connection ( No Meter)
4" Service Connection ( No Meter)
1" Air and Vacuum Valve.
2" Air and Vacuum Valve.
1" Service Connection ( No Meter)
18" Gate Valve RS
4" Blowoff
6" Blowoff
8" Gate Valve RS
12" Gate Valve RS
16" Gate Valve RS
20" Waterline PVC C-905 DR-18 Purple
4" Gate Valve RS
6" Gate Valve RS
12" Waterline PVC C-900 DR-18 Purple
16" Waterline PVC C-905 DR-18 Purple
18" Waterline PVC C-905 DR-18 Purple
4" Waterline PVC C-900 DR-18 Purple
6" Waterline PVC C-900 DR-18 Purple
8" Waterline PVC C-900 DR-18 Purple
COST
ITEM QUANTITY UNIT AMOUNT
UNIT
L.F. $ 25.00 $ 51,800.00
L.F. $ 30.00 $ 0.00
L.F. $ 35.00 $ 106,295.00
L.F. $ 46.00 $ 0.00
L.F. $ 54.00 $ 0.00
L.F. $ 90.00 $ 0.00
L.F. $ 55.00 $ 0.00
L.F. $ 62.00 $ 0.00
L.F. $ 72.00 $ 0.00
L.F. $ 81.00 $ 0.00
L.F. $ 162.00 $ 0.00
L.F. $ 183.00 $ 0.00
L.F. $ 195.00 $ 0.00
L.F. $ 215.00 $ 0.00
L.F. $ 236.00 $ 0.00
EA. $ 3,140.00 $ 59,660.00
EA. $ 4,500.00 $ 0.00
EA. $ 3,300.00 $ 0.00
EA. $ 730.00 $ 0.00
EA. $ 200.00 $ 0.00
EA. $ 2,100.00 $ 0.00
EA. $ 1,500.00 $ 0.00
EA. $ 1,500.00 $ 1,500.00
EA. $ 2,000.00 $ 0.00
EA. $ 400.00 $ 0.00
EA. $ 500.00 $ 0.00
L.F. $ 35.00 $ 0.00
EA $ 250.00 $ 7,500.00
$ $ 0.00
A. $ 226,755.00
B. $ 45,351.00
C. $ 272,106.00
D. $ 54,421.20
E. $ 326,527.20
20% x C
Sewer Total (C + D)
Subtotal
Administrative Contingency (20% x A)
Sewer Total (A + B)BOND AMOUNT FOR RECORDATION PRIOR
TO HAVING SIGNED PLAND ( ORD.460, SEC.
Concrete Encasement
8" Backflow Valves 30
Join Existing 12" Pipe
Chimney
Adjust M.H. to grade
Tie to Existing Manhole
Rechannel Existing Manhole
Join Existing 8" Pipe 1
Shallow Manhole (5' or less)
Clean out
Clean out Lateral
30" VCP
Standard Manhole 48" 19
Standard Manhole 60"
21" VCP
24" VCP
27" VCP
12" VCP
15" VCP
18" VCP
15" PVC SDR 35 Green
8" VCP
10" VCP
8" PVC SDR 35 Green 3037
10" PVC SDR 35 Green
12" PVC SDR 35 Green
COST
4" PVC SDR 35 (Use it for Residential Laterals) 2072
6" PVC SDR 35 Green
CITY OF MENIFEE ENGINEERING DEPARTMENT
IMPROVEMENT REQUIREMENT WORKSHEET
SANITARY SEWER IMPROVEMENTS
ITEM QUANTITY UNIT AMOUNT
PARCEL MAP OR TRACT NO. SCH: DATE:
PP, CU, PU, MS OR VL NO.
$ 1,164,497.19
$ 313,992.00
$
$ 272,106.00
$ 1,750,595.19
$ 34,934.92
Total
INSPECTION DEPOSIT CALCULATION
Street/DrainageA. Street/Drainage ( % x I.)
NOTE: Use 3% for Inspection
IV. Sewer (Line C from Sewer Improvement Calculations)
CITY OF MENIFEE ENGINEERING DEPARTMENT
COST ESTIMATE CALCULATION SHEET
TR 36658 2/18/2025
IMPROVEMENT COSTS (Including Contingencies)
I. Streets/Drainage (Line C from Street Improvement Calculations) II. Domestic Water (Line C from Domestic Water Improvement Calculations) III. Recycled Water (Line C from Recycled Water Improvement Calculations)
CITY OF MENIFEE
OFFICE OF THE CITY SURVEYOR
MONUMENT BOND COMPUTATION
MAP # TR 36658 SCHEDULE A MAP CHECKER Dennis Janda
Cost per Monument
$2500.00* $300
$2500.00* $600
x + 20% = Total Bond Amount
x x 120% = $125,640.00
$
Date: 2/14/2025
REVISED 2010
349 $300
Monument Inspection Fee (Deposit Based)
( ) Set monuments
( ) Monuments will need to be recovered and/or reset at time of inspection Submitted Monument Bond Computation to Planning Dept. Plan Check Review * Based on a crew of, 1) Registered Principal Eng. Technician, 1) Senior Eng. Technician.
Total Monuments to be Bonded
Schedule "I" Maps
Minimum Cost
Schedule "A" through "H" Maps
Cost per Monument
1 Approved for bonding
2/18/25
A. Backlund