Agreement

Menifee City Council
April 16, 2025

Document
Agreement
Meeting
April 16, 2025
Body
Menifee City Council
Original file
917 KB
Text extracted from the city's file for reading and search. Open the original on cityofmenifee.primegov.com. That file is the official record.

PARCEL MAP OR TRACT MAP NO. DATE:

IP:

IMPROVEMENTS
Street/Drainage $ 1,341,765.25 $ $
*Flood Control $ 0.00 $ $
Dom Wtr EMWD $ 229,860.00 $ $
Rec Wtr EMWD $ 0.00 $ $
Sewer EMWD $ 266,248.80 $ $
Total 1,837,874.05 $ $
Warranty Retention (10%) $
Construction items and their quantities, as shown on the attached sheets, are accurate for the improvements required to construct the above project and the mathmatical extensions, using City's unit costs, are accurate for determining bonding costs
Above amounts do G do not G include additional 20% for recordation prior to having signed plans (Ordinance460, Section 10.3E).
1/13/2025
Signature Date
AMIR H. FALLAHI 55534
Name Typed or printed RCE# Exp. Date
Civil Engineer's Stamp
*Flood Control Construction Cost Estimate to be provided by Flood Control District. Provide a copy of Flood Control District letter stating cost estmate.

1. Quantities are to be taken from the Improvement Plans. Unit cost are to be as provided on "City of Menifee Improvement Requirement Worksheet."

2. Show Performance Bond Amounts to the nearest $500.00. Material and Labor Bond Amounts are 50% of Performance Bond Amountss. **100% for Flood Control items.

3. For Construction items not covered by "The City of Menifee Improvement Requirements Worksheet", Design Engineer is to provide his opinion of construction cost and use that cost. If City of Menifee Unit Costs are determined to be too low, in the opinion of the design engineer, the higher costs as provided by the Design Engineer should be used.
21-084S/SD

CITY OF MENIFEE ENGINEERING DEPARTMENT

CONSTRUCTION COST WORKSHEET
TR 37409-1 1/13/2025

FAITHFUL PERFORMANCE MATERIAL & LABOR

SECURITY SECURITY
(100% of Estimated (**100% of Estimated
Construction Costs) Construction Costs)
1,342,000.00 1,342,000.00

0.00 0.00
230,000.00 230,000.00

0.00 0.00
266,000.00 266,000.00
1,838,000.00 1,838,000.00
183,800.00

DESIGN ENGINEER'S CALCULATION OF IMPROVEMENT BONDING COSTS *** PLEASE READ INSTRUCTIONS BELOW ***
Approved for bonding
A. Backlund
1/16/25

CITY OF MENIFEE ENGINEERING DEPARTMENT

IMPROVEMENT REQUIREMENT WORKSHEET

STREET AND DRAINAGE IMPROVEMENTS
UNIT
ROADWAY SECTION 1 Area = S.F.

Excavation
Cut (c) = C.Y.

Road area and side slopes to daylight Fill (f) = C.Y.

C.Y. $ 0.40 $ 0.00
C.Y. $ 1.10 $ 0.00
C.Y. $ 2.80 $ 0.00
TON $ 90.00 $ 231,161.04
Thickness in Feet (0.33' min.) =
C.Y. $ 50.00 $ 0.00
Thickness in Feet =
Ton $ 600.00 $ 2,402.22
L.F. $ 14.00 $ 92,540.00
S.F. $ 10.00 $ 8,100.00
S.F. $ 6.00 $ 181,680.00
S.F. $ 8.00 $ 170,880.00
EA. $ 1,500.00 $ 6,000.00
EA. $ 5,000.00 $ 95,000.00
EA $ 2,500.00 $ 17,500.00
$ $ 0.00
L.F. $ 113.00 $ 3,955.00
L.F. $ 132.00 $ 81,312.00
L.F. $ 153.00 $ 58,140.00
EA. $ 7,500.00 $ 22,500.00
EA. $ 11,000.00 $ 44,000.00
EA. $ 4,500.00 $ 4,500.00
EA. $ 5,000.00 $ 15,000.00
EA. $ 6,500.00 $ 6,500.00
LS $ 5,000.00 $ 5,000.00
$ $ 0.00
S.F $ 3.61 $ 158.84
EA. $ 275.00 $ 1,925.00
$ $ 0.00
LS $ 8,000.00 $ 0.00
LS $ 40,000.00 $ 0.00
LS $ 30,000.00 $ 0.00
LS $ 15,000.00 $ 0.00
A. $ 1,048,254.10
B. Administrative Contingency (20% x A) $ 209,650.82
C. CM - Inspection - LC (8%) $ 83,860.33
D Streets/Drainage Total (A + B) $ 1,341,765.25

0.00 108,100

ITEM QUANTITY UNIT AMOUNT
COST
C.Y. $ 25.00 $ Area x 0.50' (hinge point to hinge point)

2. Projects without a Grading Plan

1. Projects with Grading Plan for Roadway

0.33 Agg Base Class II
If balance, provide (a.) only, either cut or fill
If export, provide (a.)&(b.) a = fill, b = cut - fill
If import, provide (a)&(c), a = cut, c = fill - cut
(Unit costs for (a),(b), & (c) are 20% of actual costs
to assure that work will be corrected to eliminate
hazardous conditions.)
(a.) Excavate and Fill -
(b.) Excavate and Export -
(c.) Import and Fill -
Asphalt Concrete (144 lbs/cu.ft) 2,568

0.5 Asphalt Emulsion (Fog Seal/Paint Binder)
(1 ton = 240 gals)

4.0 Curb and Gutter (Type A-6) 6,610
ADA Access Ramp (w/ new construction) 4
P.C.C. Cross Gutter and Spandrels 810
P.C.C. Sidewalk 30,280
P.C.C. Driveway Approach 21,360
Gutter Depression 7
Street Lights (including conduit) 19
Catch Basin W=14' 3
Catch Basin W=21' 4
Manhole No. 4 1
Transition Structure No. 3 1
Manhole No. 1 3

DRAINAGE
24" R.C.P. round, arch or elliptical 616
30" R.C.P. round, arch or elliptical 380
18" R.C.P. round, arch or elliptical 35
1 SIGNING, STRIPING AND SIGNALS
Remove Temporary Improvements
Thermoplastic Pavement Markings 44
Street Name Sign 7
Subtotal
Design/submittals/review
Mobilization
Traffic Control
Survey
UNIT
L.F. $ 35.00 $ 82,950.00
EA. $ 4,000.00 $ 36,000.00
EA. $ 2,400.00 $ 7,200.00
EA. $ 1,200.00 $ 85,200.00
EA. $ 500.00 $ 7,500.00
EA. $ 500.00 $ 1,000.00
EA. $ 2,000.00 $ 4,000.00
LF $ 35.00 $ 4,445.00
EA. $ 120.00 $ 14,280.00
L.F. $ 1,340.00 $ 9,380.00
L.F. $ $ 0.00
A. $ 159,625.00
B. $ 31,925.00
C. $ 191,550.00
D. $ 38,310.00
E. $ 229,860.00

CITY OF MENIFEE ENGINEERING DEPARTMENT

IMPROVEMENT REQUIREMENT WORKSHEET

DOMESTIC WATER IMPROVEMENTS

ITEM QUANTITY UNIT AMOUNT
COST
8" Waterline PVC C-900 DR-18 2,370
6" Fire Hydrant (Standard) 9
1" Air and Vacuum Valve. 3
1" Service Connection with 1" Meter 71
Join at existing end of 8" pipe 2
1" Service Meter 15
Remove blowoff and air vac 2
20% x C
Water Total (C + D)
8" Gate Valve RS 7
Water Total (A + B)
Administrative Contingency (20% x A)
Subtotal
8" Waterline Fusible PVC 127
8" Miscellaneous Fittings 119
UNIT
L.F. $ 25.00 $ 52,750.00
L.F. $ 35.00 $ 87,885.00
EA. $ 3,140.00 $ 28,260.00
EA. $ 1,500.00 $ 1,500.00
EA. $ 500.00 $ 14,500.00
A. $ 184,895.00
B. $ 36,979.00
C. $ 221,874.00
D. $ 44,374.80
E. $ 266,248.80

CITY OF MENIFEE ENGINEERING DEPARTMENT

IMPROVEMENT REQUIREMENT WORKSHEET

SANITARY SEWER IMPROVEMENTS

ITEM QUANTITY UNIT AMOUNT
COST
4" PVC SDR 35 (Use it for Residential Laterals) 2110
8" PVC SDR 35 Green 2511
Standard Manhole 48" 9
Join Existing 8" Pipe 1
Backwater Valve 29

BOND AMOUNT FOR RECORDATION PRIOR
TO HAVING SIGNED PLAND ( ORD.460, SEC.
20% x C
Sewer Total (C + D)
Subtotal
Administrative Contingency (20% x A)
Sewer Total (A + B)

CITY OF MENIFEE

OFFICE OF THE CITY SURVEYOR

MONUMENT BOND COMPUTATION
MAP # 37409-1 SCHEDULE MAP CHECKER

Cost per Monument
$2500.00* $300
$2500.00* $600
x + 20% = Total Bond Amount
x x 120% = $91,440.00
$
Date:

REVISED 2010
254 $300
Monument Inspection Fee (Deposit Based)
( ) Set monuments
( ) Monuments will need to be recovered and/or reset at time of inspection Submitted Monument Bond Computation to Planning Dept. Plan Check Review * Based on a crew of, 1) Registered Principal Eng. Technician, 1) Senior Eng. Technician.

Total Monuments to be Bonded
Schedule "I" Maps
Minimum Cost
Schedule "A" through "H" Maps
Cost per Monument
Approved for bonding
A. Backlund
1/16/25