CITY OF MENIFEE
SUBJECT: Amended Fiscal Year 2025/2026 Senate Bill 1 List of Projects MEETING DATE: July 16, 2025
TO: Mayor and City Council
PREPARED BY: Jenny McConville, Management Analyst
REVIEWED BY: Nick Fidler, Public Works Director
APPROVED BY: Armando G. Villa, City Manager
-------------------------------------------------------------------------------------------------------------------------------

RECOMMENDED ACTION

1. Adopt a resolution repealing and replacing Resolution No. 25-1575 and approving the Fiscal Year 2025/2026 list of projects funded by the Road Repair and Accountability Act of 2017 under Senate Bill 1; and

2. Authorize the Public Works Director, or designee, to submit the required list of projects and accompanying amended resolution to the California Transportation Commission (CTC).

DISCUSSION
On May 21, 2025, the City Council adopted Resolution No. 25-1575, identifying the list of the Fiscal Year 2025/2026 Capital Improvement Program projects that would be funded through Senate Bill (SB) 1. The estimated useful life for the Newport Road Raised Medians project and the Beth Drive Street Improvements project was erroneously omitted from the original, adopted resolution. The California Transportation Commission (CTC) requires that the estimated useful life be included in the resolution before they approve the proposed project list for FY 2025/2026.

This is the only change made to the resolution.

SB 1 Background
SB 1, the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), was passed by the Legislature and signed into law by the Governor in April 2017, to address the significant multi-modal transportation funding shortfalls statewide. SB 1 is funded through increases in certain fuel excise taxes, sales taxes, and vehicle registration fees and is then deposited into the Road Maintenance and Rehabilitation Act (RMRA) account. A percentage of RMRA funds are continuously apportioned to eligible cities and counties by the State Controller pursuant to paragraph (2) of subdivision (h) of Section 2032 of the Streets and Highway Code (SHC) for basic road maintenance, rehabilitation, and critical safety projects on local streets and roads.

City of Menifee Staff Report
Amended FY2025/26 SB1 Project List
July 16, 2025

Page 2 of 3 ends

2 8
2 0
SHC Section 2034(a)(1) requires that prior to receiving an apportionment of RMRA funds in a fiscal year, the City must adopt a list of all projects proposed to be supported by the RMRA. This list must be adopted via resolution by City Council at a regular public meeting and must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement.

Proposed List of Projects

1.FY 2025/2026 Local Road AC Resurfacing Program - This project proposes to rehabilitate various existing roads by performing a grind and overlay using the Asphalt Rubber Aggregate Membrane (ARAM) method, capped with a 1.5” layer of asphalt hot mix; a road reconstruction is proposed on Briggs Road which would re-construct the base and Asphalt Concrete sections. Additionally, the project proposes upgrading existing curb ramps to current standards and re-stripe the roadway as needed. The project work locations vary amongst local streets within the City of Menifee. The following streets would be resurfaced under this project: Holland Road – Murrieta Rd to Western City Limits, Briggs Road – Scott Road to Southern City Limits, Shadow Mountain Trail, Moonrise Way, and First Star Court. Construction is estimated to begin in February 2026 and be completed by June 2026. This project would have a useful life of 15 years for rehabilitated roads and 20 years for reconstructed roadways.

2.FY 2025/2026 Slurry Seal Resurfacing Program – This project proposes to resurface existing roadways in good condition with a type II slurry seal to prolong their useful life.

The project work locations vary amongst local streets within the City of Menifee. The following streets would be resurfaced under this project: Blue Cedar Drive, Flaxleaf Drive, Winter Fir Drive, Rim Creek Path - Blue Cedar Dr to end of road, Golden Rain Drive – Rim Creek Path to Bramble Wood Cir, Carob Tree Circle – Rim Creek Path cul-de-sac (CDS), Bramble Wood Circle – Blue Cedar Dr to CDS, Briarwood Circle – Golden Rain Dr CDS, Lilac View Circle – Golden Rain Dr CDS, Aleppo Pine Circle – Golden Rain Dr CDS, Midsummer Lane - Menifee Rd to Palomar Rd, Amborella Way - Midsummer Ln to Thorn Tree Wy, Thorn Tree Way - Amborella Wy to Midsummer Ln, Autumn Sunset Way - Holland Rd to Heather Green Wy, Country Rose Lane – Eastside of Autumn Sunset Wy CDS, Country Rose Lane – Westside of Autumn Sunset Wy CDS, Heather Green Way - Palomar Rd to Autumn Sunset Wy, and Heather Green Way - Autumn Sunset Wy CDS.

Construction is estimated to begin in April 2026 and be completed by June 2026. This project would have a useful life of five to seven years.

3.Newport Road Raised Medians – Bradley Rd to Winter Hawk Rd – This project proposes to construct a concrete raised median on Newport Road from Bradley Road to Winterhawk Drive to address safety issues resulting from uncontrolled left turns on this six-lane high speed corridor. The project would address critical safety needs on the local streets and roads system. Construction is estimated to begin in March 2026 and be completed by June 2026. This project would have a useful life of 60 to 100 years.

4.Beth Drive Street Improvements – This project proposes to rehabilitate a deteriorating section of Beth Drive by replacing existing pavement and AC dyke with a concrete curb and gutter to prevent further road damage. Construction is estimated to begin in March City of Menifee Staff Report
Amended FY2025/26 SB1 Project List
July 16, 2025

Page 3 of 3 ends

2 8
2 0
2026 and be completed by June 2026. This project would have a useful life of 60 to 100 years.

STRATEGIC PLAN OBJECTIVE
Connectivity and Mobility

FISCAL IMPACT
There is no fiscal impact associated with the recommended action. Upon approval from the CTC of the FY 2025/2026 proposed project list submittal, the City would receive funding through RMRA for the completion of the proposed projects in the estimated amount of $2,926,976. The budgeted revenue and expenditures were presented as part of the biennial budget FY 2025/2026 and FY 2026/2027 adoption at the June 18, 2025, City Council meeting. Additional funding to finance said projects would be budgeted from the City’s FY 2025/2026 Pavement Management Program funds.