CITY OF MENIFEE
SUBJECT: Bid Award and Agreement with Riverside Construction Company, Inc. for Construction Services for the McCall Blvd Widening Project
MEETING DATE: May 6, 2026
TO: Mayor and City Council
PREPARED BY: Diego Guillen, Senior Engineer
REVIEWED BY: Nick Fidler, Public Works Director
APPROVED BY: Armando G. Villa, City Manager
-------------------------------------------------------------------------------------------------------------------------------

RECOMMENDED ACTION

1. Award bid and authorize the City Manager to execute a Contract Services Agreement with Riverside Construction Company, Inc. for construction services for McCall Boulevard Widening Project, Capital Improvement Program (CIP) Project No. 22-03, located east of the I-215 freeway along McCall Boulevard between Oakhurst/Hospital Way and Junipero Road, in a total not-to-exceed amount of $4,262,584.00.

DISCUSSION
The McCall Boulevard (Blvd) Widening Project, CIP Project No. 22-03 (Project), is located between Oakhurst Avenue and Junipero Road. The existing roadway consists of two lanes for approximately half a mile before expanding to a four-lane roadway. There is a need for additional vehicle lanes to support current and future traffic volumes due to the increased residential and commercial development in the area. Under the City’s General Plan, this segment of McCall Boulevard is designated as an arterial roadway that would ultimately provide six vehicle lanes.

The Project would widen the existing two-lane road to a four-lane corridor and establish horizontal and vertical alignments to meet the requirements of the California Highway Design Manual and City standards. The Project is currently in the construction award phase.

On April 9, 2026, an electronic bid opening was held following the administration of a formal competitive bid process for construction services for the Project. The bid opening resulted in the receipt of seven bid submissions, as summarized in Table 1 on the following page.

City of Menifee Staff Report
CIP 22-03 Riverside Construction Company, Inc. Bid Award May 6, 2026

Page 2 of 3 ends

3 3
0 2
TABLE 1 – BID RESULTS SUMMARY
Firm Name Total Base Bid
Amount
Lowest and
Responsible Bidder
Engineers Estimate $6,700,000.00
Hillcrest Contracting, Inc. $3,909,248.55 Deemed non-responsive Riverside Construction Company, Inc $4,262,584.00 X
Granite Construction Company. $4,313,000.00
Universal Construction & Engineering $4,344,025.21
SEMA Construction, Inc. $4,843,227.84
CT&T Concrete Paving Inc. $5,539,286.90
Staff reviewed the apparent lowest bid and determined Hillcrest Contracting, Inc. to be non- responsive as they did not submit the required hard copy bid documents 24 hours after the bid due date. The second apparent lowest bid submission was then reviewed and staff determined that Riverside Construction Company, Inc. (Contractor) met the requirements for recommendation as the lowest responsive and responsible bidder. The total cost for construction services with the Contractor is $4,262,584.00. Construction management and inspection services would be provided by City staff and ancillary services, such as labor compliance and materials testing, would be procured separately.

The total estimated construction cost is $4,912,703.17, which would include the cost of construction services, ancillary services such as labor compliance, materials testing, tribal monitoring, environmental mitigation measures during construction as well as any unforeseen costs that may arise during construction.

If approved by the City Council, the tentative Project schedule would be as follows:

Construction Start: May 2026
Construction End: August 2026
City Council Acceptance: November 2026
The timeline above assumes no delays due to weather or unforeseen conditions.

Environmental Impact
The City of Menifee Planning Commission, as the lead agency, adopted a Mitigated Negative Declaration on May 8, 2024, and filed and posted a Notice of Determination with the County of Riverside, Clerk of the Board of Supervisors on May 14, 2024, making the following determinations regarding the Project:

1. The Project will not have a significant effect on the environment.

2. A Mitigated Negative Declaration was prepared for this project pursuant to the provisions of CEQA, and this Mitigated Negative Declaration is adequate for this approval. See, e.g., CEQA Guidelines § 15162.

3. Mitigation measures were made a condition of the approval of the Project.

4. A Mitigation Reporting or Monitoring Plan was adopted for this Project.

5. A Statement of Overriding Considerations was adopted for this Project.

6. Findings were made pursuant to the provisions of CEQA City of Menifee Staff Report
CIP 22-03 Riverside Construction Company, Inc. Bid Award May 6, 2026

Page 3 of 3 ends

3 3
0 2
The amount of the proposed agreement exceeds the City Manager’s signing authority. Pursuant to Resolution No. 24-1569 and Menifee Municipal Code §3.12.060, any contract amount that exceeds the City Manager’s signing authority shall be approved by the City Council.

STRATEGIC PLAN OBJECTIVE
Connectivity and Mobility

FISCAL IMPACT
The fiscal impact of the proposed Contract with Riverside Construction Company, Inc. is in the total amount not-to-exceed $4,262,584.00. The total anticipated fiscal impact for the full construction phase of the Project is $4,912,703.17. Funding for the proposed Contract is available in the Fiscal Year (FY) 2025/2026 budget within the CIP Fund from Measure A funds (4320-PWD-CIPS-900-02220-690050), the Regional Arterial Grant (17004), TUMF funds (02310), and the Capital Projects funds (04320), as summarized in Table 2 below.

TABLE 2 – PROJECT BUDGET
Funding
Source
Project String No. Available
Budget
Anticipated
Cost
Measure A 4320-55-PWD-CIPS-900-02220-690000
CIP22-03.2220.CON.CAE
$899,732.31 $0
Regional
Arterial Grant*
4320-55-PWD-CIPS-900-17004-690000
CIP22-03.2301.CON.CAE
$3,140,000.00 $2,651,327.00
TUMF 4320-55-PWD-CIPS-900-02310-690000
CIP22-03.2310.CON.CAE
$1,738,518.24 $1,311,257.00
Capital
Projects
4320-55-PWD-CIPS-900-04320-690000
CIP22-03.4320.CON.CAE
$300,000.00 $300,000.00
TOTAL $6,078,250.55 $4,262,584.00
*Expenditure of Regional Arterial Grant funding requires a proportionate share of local match funds be expended. As such, funding support for the Contract has been requested proportionately between the available Regional Arterial Grant budget and also from TUMF and Capital Projects funds (local match funds).

ATTACHMENTS

1. Project Location Map

2. Contract