1. Adopt a resolution approving the Fiscal Year 2026/2027 list of projects funded by the Road Repair and Accountability Act of 2017 under Senate Bill 1; and
2. Authorize the Public Works Director, or designee, to submit the required list of projects and accompanying resolution to the California Transportation Commission (CTC).
DISCUSSION
Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide. SB 1 is funded through increases in certain fuel excise taxes, sales taxes, and vehicle registration fees and is then deposited into the Road Maintenance and Rehabilitation Act (RMRA) account. A percentage of RMRA funds are continuously apportioned to eligible cities and counties by the State Controller pursuant to paragraph (2) of subdivision (h) of Section 2032 of the Streets and Highway Code (SHC) for basic road maintenance, rehabilitation, and critical safety projects on local streets and roads.
SHC Section 2034(a)(1) requires that prior to receiving an apportionment of RMRA funds in a fiscal year, the City must adopt a list of all projects proposed to be supported by the RMRA. This list must be adopted via resolution by City Council at a regular public meeting and must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of improvement.
If the City fails to submit the required list of projects and resolutions, funds that were allocated to the City would be redistributed to other agencies. For Fiscal Year (FY) 2026/2027, the City is estimated to receive approximately $3,235,597 in RMRA funds. These funds are proposed to be
City of Menifee Staff Report
FY2026/27 SB1 Project List
June 3,2026
3 3
1 2
used to support the following list of proposed projects included in the City’s FY 2026/2027 Capital Improvement Program (CIP) and Pavement Management Program (PMP) budgets:
1.FY 2026/2027 Local Road AC Resurfacing Program – This project proposes to perform a header grinds and resurface an existing secondary roadway using the Asphalt Rubber Aggregate Membrane (ARAM) method, capped with a thin layer of asphalt hot mix.
Additionally, the project proposes to upgrade existing curb ramps to current standards and re-stripe the roadway. The project work location is planned for Bradley Road from Potomac Drive to Cherry Hills Boulevard. Construction is estimated to begin in February 2027 and be completed by June 2027. This project would have a useful life of 15 years for rehabilitated roads and 20 years for reconstructed roadways. (CIP 27-02).
2.FY 2026/2027 Slurry Seal Resurfacing Program – This project proposes to resurface existing roadways in good condition via cape seal application to prolong their useful life.
The project work would be performed within two residential communities; the first is located north of Holland Road and east of Bradley Road and would include the following streets:
•Southbrook Court
•Alta Mira Street
•Rancho Serena Street
•Mirage Circle
•Sonora Street
•Falcon Ridge Circle
•Stonecreek Court
•Country View Court
•Summerwood Circle
•Rhapsody Court
•Canberra Street
•Adobe Ridge Circle
•Tierra Linda Court
The second residential community is located south of Holland Road between Menifee Road and Bell Mountain Road and includes the following streets:
•Shadow Mountain Trail
•Evening Passage Drive
•Golden Dawn Drive
•Aurora Hill Place
•Glencoe Lane
Construction is estimated to begin in April 2027 and be completed by June 2027. This project would have a useful life of five to seven years. (PMP 27-01).
City of Menifee Staff Report
FY2026/27 SB1 Project List
June 3,2026
3 3
1 2
STRATEGIC PLAN OBJECTIVE
Connectivity and Mobility
FISCAL IMPACT
There is no fiscal impact associated with the recommended action. The City would receive funding through RMRA for the completion of the proposed projects in the estimated amount of $3,235,597.
A portion of the estimated revenues and expenditures were previously included in the approved FY 2025/2026 and FY 2026/2027 CIP budgets. An additional appropriation of SB1 funding in the amount of $264,000 for CIP27-02 has been requested via the proposed FY 2026/2027 Mid-Cycle CIP Budget item also being presented for City Council consideration at this June 3, 2026, City Council meeting.
ATTACHMENTS
1. Project Location Maps
2. Resolution