CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
1. CITY CLERK
1.01 Public Nuisance Lien Processing Per Lien $428.00 $414.57 $391
1.02 Document Reproduction^ Per Copy State Set $0.25 $0.25 $0.25
1.03 Document Certification Per Document $18.35 $17.79 $17
1.04 Digital Media Reproduction Per Media $6.55 $6.35 $6
1.05 Candidate Filing Processing^ Per Candidate State Set $25.00 $25.00 $25
1.06 City Initiative Processing (refundable)^ Per Initiative State Set $200.00 $200.00 $200
1.07 Research/Compiling Service Actual Costs Actual Costs Actual Costs
1.08 Certification of Life Per certification $16.35 $15.88 $15
1.09 Certified Copies Per copy $16.35 $15.88 $15
1.10 Affidavit Process for Building Plans Per Request $109.30 $105.90 $100
1.11 Copies of Maps Actual Costs Actual Costs Actual Costs Passports
Adult Application Fees^: State Set
1.12 First Time Passport Book Each State Set $130.00 $130.00 $130
1.13 First Time Passport Card Each State Set $30.00 $30.00 $30
1.14 First Time Passport Book & Card Each State Set $160.00 $160.00 $160
1.15 Passport Card only Each State Set $30.00 $30.00 $30
1.16 Passport Acceptance Fee (Adult / Minor) Each State Set $35.00 $35.00 $35 Adult Renewal Fees^: State Set
1.17 Passport Book Each State Set $130.00 $130.00 $130
1.18 Passport Card only Each State Set $30.00 $30.00 $30
1.19 Passport Book & Card Each State Set $160.00 $160.00 $160 Minor Application Fee^: State Set
1.20 Minor Passport Book Each State Set $100.00 $100.00 $100
1.21 Minor Passport Card Each State Set $15.00 $15.00 $15
1.22 Minor Passport Book & Card Each State Set $115.00 $115.00 $115
2. FINANCE
2.01 New Business Registration Per Application $83.05 $80.49 $76
2.02 Renewal Business Registration Per Application $62.30 $60.36 $57
2.03 Late Payment Renewal Business Registration Penalty $61.20 $59.30 $56
2.04 Business Registration Change of Name Per Application $20.75 $20.12 $19
2.05 Business Registration Change of Physical Address Per Application $41.50 $40.24 $38
2.06 Business Registration Change of Mailing Address Per Application $6.55 $6.35 $6
2.07 Duplicate Business License Per Application $6.55 $6.35 $6 Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
1 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
2.08 Reinstatement of Business License Penalty Penalty Penalty Penalty
2.09 Single Day Event Business License Per Application $20.75 $20.12 $19 Returned Check Processing^ State Set
2.10 1st Check Per Returned Check State Set $25.00 $25.00 $25
2.11 Subsequent Checks Per Returned Check State Set $35.00 $35.00 $35 2 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
3. COMMUNITY SERVICES****
Facility Rentals
Small - Up to 20 capacity
3.01 Deposit Deposit Yes $50.00 $50.00 $50
3.02 Non-Resident Per hour $60.00 $40.00 $40
3.03 Resident Per hour $24.00 $20.00 $20
3.04 Resident Non-Profit (Youth Sports and Others) Per hour $24.00 $20.00 $20
3.05 City Sponsored Per hour $0.00 $0.00 $0
Medium - Up to 50 capacity
3.06 Deposit Deposit Yes $100.00 $100.00 $100
3.07 Non-Resident Per hour $65.00 $50.00 $50
3.08 Resident Per hour $30.00 $25.00 $25
3.09 Resident Non-Profit (Youth Sports and Others) Per hour $30.00 $25.00 $25
3.10 City Sponsored Per hour $0.00 $0.00 $0
Large - Up to 150 capacity
3.11 Deposit Deposit Yes $200.00 $200.00 $200
3.12 Non-Resident Per hour $149.00 $80.00 $80
3.13 Resident Per hour $48.00 $40.00 $40
3.14 Resident Non-Profit (Youth Sports and Others) Per hour $48.00 $40.00 $40
3.15 City Sponsored Per hour $0.00 $0.00 $0
Kitchen
3.16 Deposit Deposit Yes $100.00 $100.00 $100
3.17 Kitchen Rental Per hour $100.00 $100.00 $100
3.18 Alcohol Use Additional Deposit Yes $200.00 $200.00 $200
3.19 Additional City Staff as Needed Hourly Rate $74.00 $74.41 $74 Other Rentals
3.70 Palm Room Light Board Per Event $25.00
3.71 Indoor Rentals Application Fee Per Application $25.00
3.44 Park Special Events Application Fee (park rentals and tournaments) Per Application $50.00
Picnic Rentals
Picnic Shelter - Small
3.20 Non-Resident Per hour $20.00 $20.00 $20
3.21 Resident Per hour $10.00 $10.00 $10
3.22 Resident Non-Profit (Youth Sports and Others) Per hour $10.00 $10.00 $10 3 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
3.23 City Sponsored Per hour $0.00 $0.00 $0
Picnic Shelter - Large
3.24 Non-Resident Per hour $30.00 $30.00 $30
3.25 Resident Per hour $15.00 $15.00 $15
3.26 Resident Non-Profit (Youth Sports and Others) Per hour $15.00 $15.00 $15
3.27 City Sponsored Per hour $0.00 $0.00 $0
3.28 Rental with Jumper / Food Vendor Per rental $25.00 $25.00 $25 Field Rentals
One-Time Rentals of Ballfield, Multi-Purpose Field, or General Use Field
3.29 Deposit Deposit Yes $60.00 $50.00 $50
3.30 Non-Resident Per hour $28.00 $20.00 $20
3.72 Non-Resident, Baseball Diamond Per hour $32.00
3.73 Non-Resident, General Use Field Per hour $25.00
3.31 Resident, Multipurpose Field Per hour $12.00 $10.00 $10
3.74 Resident, Baseball Diamond Per hour $12.00
3.75 Resident, General Use Field Per hour $10.00
3.32 Resident Non-Profit (Youth Sports and Others) Per hour $6.00 $10.00 $10
3.76 Resident Non-Profit, Baseball Diamond (Youth Sports and Others) Per hour $6.00
3.77 Resident Non-Profit, General Use Field (Youth Sports and Others) Per hour $5.00
3.33 City Sponsored Per hour $0.00 $0.00 $0
Field Lights
3.34 Non-Resident Per hour $25.00 $20.00 $20
3.35 Resident Per hour $12.00 $10.00 $10
3.36 Resident Non-Profit (Youth Sports and Others) Per hour $12.00 $10.00 $10
3.37 City Sponsored Per hour $0.00 $0.00 $0
3.38 Snack Bar Deposit Deposit Yes $50.00 $50.00 $50
Tournament Use of Ballfield or Multi-Purpose Field (4-hour minimum)
3.39 Deposit Deposit Yes $455.00 $50.00 $50
3.40 Non-Resident Per hour $60.00 $25.00 $25
3.41 Resident Per hour $25.00 $13.00 $13
3.42 Resident Non-Profit (Youth Sports and Others) Per hour $23.00 $12.55 $13
3.43 City Sponsored Per hour $0.00 $0.00 $0
Other Field
3.68 Sport Field Striping (Per Field) (Resident) $18.00 $15.00 4 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
3.69 Sport Field Striping (Per Field) (Non-Resident) $138.00 $20.00 One-Time Rentals of Tennis, Basketball, or Pickleball Courts
3.78 Non-Resident, Tennis Court Per hour $17.00
3.79 Non-Resident, Basketball Court Per hour $17.00
3.80 Non-Resident, Pickleball Court Per hour $17.00
3.81 Resident, Tennis Court Per hour $9.00
3.82 Resident, Basketball Court Per hour $9.00
3.83 Resident, Pickleball Court Per hour $9.00
3.84 Resident Non-Profit, Tennis Court (Youth Sports and Others) Per hour $5.00
3.85 Resident Non-Profit, Basketball Court (Youth Sports and Others) Per hour $5.00
3.86 Resident Non-Profit, Pickleball Court (Youth Sports and Others) Per hour $5.00
3.87 City Sponsored Use of Tennis, Basketball, or Pickleball Courts Per hour $0.00 Tournament Use of Tennis, Basketball, or Pickleball Courts (4- hour minimum)
3.88 Deposit Deposit Yes $227.00
3.89 Non-Resident Per hour/Per court $119.00
3.90 Resident Per hour/Per court $35.00
3.91 Resident Non-Profit (Youth Sports and Others) Per hour/Per court $30.00
3.92 City Sponsored Per hour/Per court $0.00
3.44 Park Special Events. This fee moved to misc facility rental fees "Park Special Event Application Fee Per Permit $0.00 $50.00 $50 100-249 Attendees
3.45 Deposit Deposit Yes $60.00 $50.00 $50
3.46 Non-Resident Per Permit $95.00 $95.00 $95
3.47 Resident Per Permit $58.00 $48.00 $48
3.48 Resident Non-Profit (Youth Sports and Others) Per Permit $58.00 $47.50 $48
3.49 City Sponsored Per Permit $0.00 $0.00 $0
250-499 Attendees
3.50 Deposit Deposit Yes $120.00 $100.00 $100
3.51 Non-Resident Per Permit $170.00 $170.00 $170
3.52 Resident Per Permit $102.00 $85.00 $85
3.53 Resident Non-Profit (Youth Sports and Others) Per Permit $102.00 $85.00 $85
3.54 City Sponsored Per Permit $0.00 $0.00 $0
Park Rentals for Private Events (Central, Centennial, La Ladera, Audie Murphy Parks Only) Court Rentals - NEW
5 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
500-999 Attendees (Central Park Only)
3.55 Deposit Deposit Yes $180.00 $150.00 $150
3.56 Non-Resident Per Permit $270.00 $270.00 $270
3.57 Resident Per Permit $162.00 $135.00 $135
3.58 Resident Non-Profit (Youth Sports and Others) Per Permit $162.00 $135.00 $135
3.59 City Sponsored Per Permit $0.00 $0.00 $0
1,000+ Attendees (Central Park Only)
3.60 Deposit Deposit Yes $360.00 $300.00 $300
3.61 Non-Resident Per Permit $360.00 $350.00 $350
3.62 Resident Per Permit $210.00 $175.00 $175
3.63 Resident Non-Profit (Youth Sports and Others) Per Permit $210.00 $175.00 $175
3.64 City Sponsored Per Permit $0.00 $0.00 $0
Miscellaneous Fees:
3.65 Administrative Processing Fee - Rental Cancellation Per Permit $12.00 $12.00 $12
3.66 Residential Self-Haul Permit Application Per Permit $101.00 $101.00 $101
3.67 Residential Self-Haul Permit Renewal Per Permit $33.00 $33.00 $33 Programmatic / Sport / Afterschool Fees - See Activity Guide for most up to dates rates
4. CODE ENFORCEMENT
4.01 Vacant Lot Weed Abatement Per Lot $478.85 $463.86 $438
4.02 Weed Abatement Appeal to City Council Per Appeal $727.05 $704.25 $665
4.03 Foreclosed Property Registration/Inspection Per Property $137.75 $133.44 $126
4.04 Each inspection after 1st inspection Per Inspection $137.75 $133.44 $126
4.05 Summary Abatement Actual Costs Actual Costs Actual Costs
4.06 Notice of Pendency Per Notice $135.55 $131.32 $124
4.07 Graffiti Removal Actual Costs Actual Costs Actual Costs
4.08 Hourly Rate Per Hour $205.55 $199.10 $188
5. POLICE
Police Reports
5.01 Per Report (Crimes, Collisions, and CAD Printouts) Per Report $19.65 $19.06 $18 Media Duplication
5.02 Flash Drive, CD, DVD, or Email regardless of volume Per Media $21.85 $21.19 $20 Clearance Letters
5.03 Police Clearance Each $26.55 $25.74 $20
Citation Sign Offs
5.04 Menifee PD Citation Each $0.00 $0.00 $0
6 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
5.05 Outside Agency Citation $26.55 $25.74 $15
Concealed Weapons Permit
5.06 Initial Application Processing Flat $109.30 $105.90 $100
5.07 Renewals Flat $27.30 $26.48 $25
5.08 Updates Flat $10.90 $10.59 $10
Livescan
5.09 Rolling Fee Flat $27.30 $26.48 $25
5.10 FBI Processing Fee^ State Regulated State Set State Regulated State Regulated State Regulated
5.11 DOJ Processing Fee^ State Regulated State Set State Regulated State Regulated State Regulated
5.12 CACI (Child Abuse Index Fee)^ State Regulated State Set State Regulated State Regulated State Regulated
5.13 Firearms Fee^ State Regulated State Set State Regulated State Regulated State Regulated Vehicle Identification Number (VIN)
5.14 VIN Verification Charge (Individuals Only) Each $31.85 $30.88 $25 Stored or Impounded Vehicles
5.15 Vehicle Release (Stored) Flat $159.40 $154.41 $100
5.16 Vehicle Release (Impounded or DUI) Flat $212.55 $205.88 $150
5.17 Abandoned Flat $159.40 $154.41 $100
Vehicle Repossession
5.18 Vehicle Repossession Fee Flat $16.35 $15.88 $15
Subpoenas
5.19 Admin Fee per Subpoena^ State Regulated State Set $15.00 $15.00 $15
5.20 Witness Fee^ Flat State Set $275.00 $275.00 $275
DUI Emergency Response^ State Set
5.21 Emergency Response to DUI Investigations State Set Actual Costs up to $12,000
Actual Costs up to
$12,000
Actual Costs up to
$12,000
Noise Ordinance
5.22 1st Response
5.23 2nd Response $164.00 $158.86 $150
5.24 3rd Response $546.65 $529.51 $500
5.25 4th Response $1,093.30 $1,059.03 $1,000
5.26 5th+ Response $2,733.35 $2,647.57 $2,500
Sworn Personnel Services
Special Events, 4 Hour Minimum
5.27 Lieutenant – per hour Actual Costs $237.25 $229.81 $217
5.28 Sergeant – per hour Actual Costs $212.10 $205.45 $194 7 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
5.29 Officer – per hour Actual Costs $182.55 $176.86 $167
5.30 Community Service Officer – per hour Actual Costs $167.25 $162.03 $153
6. FIRE
Fire Sprinkler Systems*
New 13, 13R Fire Sprinkler System - Up to 250 sprinkler heads
6.01 Plan Check Flat $255.15 $247.16 $233
6.02 Inspection Base $241.35 $233.79 $221
New 13, 13R Fire Sprinkler System - 251 to 500 sprinkler heads
6.03 Plan Check Flat $382.75 $370.74 $350
6.04 Inspection Base $362.05 $350.69 $331
New 13, 13R Fire Sprinkler System - 500+ sprinkler heads
6.05 Plan Check Flat $765.50 $741.48 $700
6.06 Inspection Base $724.05 $701.37 $662
6.07 Inspection - Per Sprinkler Head Per sprinkler head $9.65 $9.35 $9 New 13D Residential Fire Sprinkler System (Base fee Per Model)
6.08 Plan Check Base $382.75 $370.74 $350
6.09 Inspection Base $241.35 $233.79 $221
6.10 Inspection - Per Sprinkler Head Per sprinkler head $9.65 $9.35 $9 New 13D Residential Fire Sprinkler System - Low Pressure Tract (Per
6.11 Plan Check Base $254.75 $246.76 $233
6.12 Inspection Base $241.35 $233.79 $221
6.13 Inspection - Per Sprinkler Head Per sprinkler head $9.65 $9.35 $9 TI 13, 13R Fire Sprinkler System
6.14 Plan Check Flat $382.75 $370.74 $350
6.15 Inspection Base $241.35 $233.79 $221
6.16 Inspection - Per Sprinkler Head Per sprinkler head $9.65 $9.35 $9 TI 13D Residential Fire Sprinkler System
6.17 Plan Check Flat $255.15 $247.16 $233
6.18 Inspection Base $241.35 $233.79 $221
6.19 Inspection - Per Sprinkler Head Per sprinkler head $9.65 $9.35 $9 Water System Permits*
New Underground Fire Line
6.20 Plan Check Flat $433.75 $420.17 $397
6.21 Inspection Flat $615.45 $596.17 $563
Fire Pump (Per Pump)
6.22 Plan Check Flat $701.70 $679.69 $642
8 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
6.23 Inspection Flat $965.45 $935.16 $883
Emergency Underground Fire Line Repair
6.24 Plan Check Flat $382.75 $370.74 $350
6.25 Inspection Flat $663.75 $642.92 $607
6.26 Fire Hydrant/Water Flow Witness Flat $241.35 $233.79 $221 Above Ground Tank (Temporary Water Supply/Construction)
6.27 Plan Check Flat $382.75 $370.74 $350
6.28 Inspection Flat $362.05 $350.69 $331
Fire Alarm*
New Alarm System
6.29 Plan Check Flat $765.50 $741.48 $700
6.30 Inspection Base $482.70 $467.57 $442
6.31 Inspection - Each Device Per device $9.65 $9.35 $9 TI Fire Alarm System
6.32 Plan Check Flat $574.10 $556.11 $525
6.33 Inspection Base $241.35 $233.79 $221
6.34 Inspection - Each Device Per device $9.65 $9.35 $9 FACP Modification
6.35 Plan Check Flat $255.15 $247.16 $233
6.36 Inspection Flat $241.35 $233.79 $221
Water Flow (Monitoring) Alarm System Only
6.37 Plan Check Flat $255.15 $247.16 $233
6.38 Inspection Flat $241.35 $233.79 $221
Fire Protection Systems*
Special Extinguishing Systems (FM200, Dry Chem, Spray Mist, etc.)
6.39 Plan Check Per System $637.90 $617.90 $583
6.40 Inspection Per System $362.05 $350.69 $331
Smoke Control System-Rationale, Analysis and Plan Review
6.41 Plan Check Flat $1,531.00 $1,482.96 $1,400
6.42 Inspection Flat $1,448.15 $1,402.73 $1,325
Other Systems*
Hood & Duct Automatic Extinguishing System (Per system)
6.43 Plan Check Per System $255.15 $247.16 $233
6.44 Inspection Per System $362.05 $350.69 $331
Ovens, Industrial baking or drying, furnace or kiln Special Equipment
6.45 Plan Check Per oven $191.35 $185.37 $175
9 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
6.46 Inspection Per oven $241.35 $233.79 $221
Dust Collection Special Equipment (Per system)
6.47 Plan Check Per System $325.30 $315.13 $298
6.48 Inspection Per System $307.70 $298.08 $281
Solar Photovoltaic System Plan Check and Inspection
6.49 Plan Check Hourly $255.15 $247.16 $233
6.50 Inspection Hourly $241.35 $233.79 $221
Refrigeration System
6.51 Plan Check Per System $255.15 $247.16 $233
6.52 Inspection Per System $307.70 $298.08 $281
Spray Booths (Per Booth/System)
6.53 Plan Check Per Booth/System $325.30 $315.13 $298
6.54 Inspection Per Booth/System $422.35 $409.14 $386
Liquified Petroleum Gases (LPG) Special System (Per System)
6.55 Plan Check Per System $382.75 $370.74 $350
6.56 Inspection Per System $482.70 $467.57 $442
Gas Systems (Med Gas, Industrial Gas, LPG) (Per System)
6.57 Plan Check Per System $382.75 $370.74 $350
6.58 Inspection Per System $422.35 $409.14 $386
Emergency Responder Radio Coverage (Per System)
6.59 Plan Check Per System $255.15 $247.16 $233
6.60 Inspection Per System $241.35 $233.79 $221
Generator - Cell Sites (Per Gen/Site)
6.61 Plan Check Per Gen/Site $382.65 $370.66 $350
6.62 Inspection Per Gen/Site $241.35 $233.79 $221
Generator
6.63 Plan Check Per generator $382.75 $370.74 $350
6.64 Inspection Per generator $241.35 $233.79 $221
Battery Systems - Residential
6.65 Plan Check Per System $382.65 $370.66 $350
6.66 Inspection Per System $241.35 $233.79 $221
Battery Systems - Commercial
6.67 Plan Check Per System $637.40 $617.41 $583
6.68 Inspection Per System $205.15 $198.73 $188
Battery Systems Facilities
10 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
6.69 Plan Check Flat $1,020.65 $988.64 $934
6.70 Inspection Flat $844.75 $818.26 $773
CO2 System
6.71 Plan Check Flat $254.75 $246.76 $233
6.72 Inspection Flat $241.60 $234.04 $221
Hazardous Materials*
Chemical Classification Disclosure Review <10 Chemicals
6.73 Plan Check Flat $382.75 $370.74 $350
6.74 Inspection Flat $241.35 $233.79 $221
Chemical Classification Disclosure Review 10-25 Chemicals
6.75 Plan Check Flat $510.30 $494.32 $467
6.76 Inspection Flat $362.05 $350.69 $331
Chemical Classification Disclosure Review 26-100 Chemicals
6.77 Plan Check Flat $893.05 $865.06 $817
6.78 Inspection Flat $482.70 $467.57 $442
Chemical Classification Disclosure Review >100 Chemicals
6.79 Plan Check Flat $1,212.00 $1,174.01 $1,109
6.80 Inspection Flat $724.05 $701.37 $662
High Piled Storage*
High Piled Combustible Storage Up to 12,000 square feet
6.81 Plan Check Flat $510.30 $494.32 $467
6.82 Inspection Flat $362.05 $350.69 $331
High Piled Combustible Storage 12,001-50,000 square feet
6.83 Plan Check Flat $765.50 $741.48 $700
6.84 Inspection Flat $482.70 $467.57 $442
High Piled Combustible Storage 50,001-100,000 square feet
6.85 Plan Check Flat $893.05 $865.06 $817
6.86 Inspection Flat $724.05 $701.37 $662
High Piled Combustible Storage >100,000 square feet
6.87 Plan Check Flat $1,148.25 $1,112.22 $1,050
6.88 Inspection Flat $844.75 $818.26 $773
Access and Water Supply*
Access and Water Supply Only - Commercial Construction Inspection
6.89 Plan Check Flat $255.15 $247.16 $233
6.90 Inspection Flat $241.35 $233.79 $221
Access and Water Supply Only - Residential Construction Inspection 11 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
6.91 One Lot Base $181.00 $175.34 $166
6.92 Each Additional Lot Each additional lot $36.20 $35.07 $33 Fire Lane Plan Check and Inspection
6.93 Plan Check Flat $127.55 $123.58 $117
6.94 Inspection Flat $120.65 $116.90 $110
6.95 Fuel Modification Inspection Per Phase $241.35 $233.79 $221 Tanks*
Underground Storage Tanks Install or Removal
6.96 Plan Check Per tank $255.15 $247.16 $233
6.97 Inspection Per tank $241.35 $233.79 $221
Aboveground Storage Tank Install or Removal
6.98 Plan Check Per tank $255.15 $247.16 $233
6.99 Inspection Per tank $241.35 $233.79 $221
Alterations to Gas Stations (No tank alterations)
6.100 Plan Check Flat $255.15 $247.16 $233
6.101 Inspection Flat $241.35 $233.79 $221
Other Fees
6.102 Work without Approval or Permit Penalty $362.05 $350.69 $331
6.103 Fire Stand-by Per Hour per Person $241.35 $233.79 $221 Alternative Materials and Methods (4 hour minimum, hourly thereafter)
6.104 Plan Check First 4 hours $765.50 $741.48 $700
6.105 Inspection First 4 hours $241.35 $233.79 $221
6.106 Consultant Fire Plan Review Actual Costs
6.107 3rd Review and subsequent submittals Per hour $255.15 $247.16 $233
6.108 Expedited/Overtime Plan Review Per hour $382.75 $370.74 $350
6.109 Over the Counter/Misc. Revisions Plan Review Per Plan Review $191.35 $185.37 $175 Drilling / Blasting Permit - Initial (min. 2 hrs)
6.110 Plan Check Per Hour $255.15 $247.16 $233
6.111 Inspection Per Hour $241.35 $233.79 $221
Renewable Permit Fees (Issued at Annual Fire-Life Safety Inspection
6.112 Aerosol Products (Level 2 & 3) Flat $102.55 $99.36 $94
6.113 Amusement Building Flat $181.00 $175.34 $166
6.114 Aviation Facilities Flat $241.35 $233.79 $221
6.115 Cellulose Nitrate Storage Flat $102.55 $99.36 $94
6.116 Combustible Dust Producing Operations Flat $120.65 $116.90 $110 12 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
6.117 Combustible Fiber Storage Flat $181.00 $175.34 $166
6.118 Compressed Gases Flat $241.35 $233.79 $221
6.119 Covered and open mall buildings Flat $301.70 $292.24 $276
6.120 Cryogenic Fluids Flat $241.35 $233.79 $221
6.121 Cutting and Welding Flat $120.65 $116.90 $110
6.122 Dry Cleaning Flat $241.35 $233.79 $221
6.123 Exhibits and Trade Shows Flat $241.35 $233.79 $221
6.124 Explosives Flat $482.70 $467.57 $442
6.125 Fire Hydrants and Valves Flat $120.65 $116.90 $110
6.126 Flammable and Comustible Liquids Flat $181.00 $175.34 $166
6.127 Floor Finishing Flat $120.65 $116.90 $110
6.128 Fruit and Crop Ripening Flat $120.65 $116.90 $110
6.129 Fumigation and Insecticidial Fogging Flat $120.65 $116.90 $110
6.130 Hazardous Materials Flat $241.35 $233.79 $221
6.131 HPM Facilites Flat $181.00 $175.34 $166
6.132 High Piled Combustible Storage <12,000 Square Feet Flat $181.00 $175.34 $166
6.133 High Piled Combustible Storage 12,001-50,000 Square Feet Flat $482.70 $467.57 $442
6.134 High Piled Combustible Storage >100,000 Square Feet Flat $844.75 $818.26 $773
6.135 Hot Work Operation Flat $120.65 $116.90 $110
6.136 Industrial Ovens Flat $120.65 $116.90 $110
6.137 Lumber Yard/Woodworking Plants Flat $241.35 $233.79 $221
6.138 Liquid or gas-fueled vehicles or equipment in assembly buildings Flat $120.65 $116.90 $110
6.139 LP-gas Flat $181.00 $175.34 $166
6.140 Magnesium Flat $120.65 $116.90 $110
6.141 Miscellaneous Combustible Storage Flat $241.35 $233.79 $221
6.142 Mobile Food Preparation Vehicles Flat $120.65 $116.90 $110
6.143 Motor Fuel Dispensing Facilities Flat $181.00 $175.34 $166
6.144 Open Burning Flat $120.65 $116.90 $110
6.145 Open Flames and Torches Flat $102.55 $99.36 $94
6.146 Open Flames and Candles Flat $102.55 $99.36 $94
6.147 Organic Coatings Flat $181.00 $175.34 $166
6.148 Outdoor Assembly Events (see special events)
6.149 Places of Assembly Flat $153.85 $149.04 $141
6.150 Plant Extraction Systems Flat $241.35 $233.79 $221 13 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
6.151 Private Fire Hydrant Flat $120.65 $116.90 $110
6.152 Pyrotechnic special effects material (see explosives)
6.153 Proxylin Plastics Flat $120.65 $116.90 $110
6.154 Refrigeration Equipment Flat $241.35 $233.79 $221
6.155 Repair Garages and Motor Fuel- Dispensing Facilities Flat $359.00 $347.76 $328
6.156 Rooftop Heliports Flat $181.00 $175.34 $166
6.157 Spraying or Dipping Operations Flat $102.55 $99.36 $94
6.158 Storage of scrap tires and tire byproducts Flat $120.65 $116.90 $110
6.159 Temporary membrane structures and tents (see special events)
6.160 Tire-Rebuilding Plants Flat $120.65 $116.90 $110
6.161 Waste Handling Flat $181.00 $175.34 $166
6.162 Wood Products Flat $160.90 $155.86 $147
6.163 CO2 Dispensing System Flat $100.55 $97.41 $92
6.164 CO2 Enrichment Flat $120.65 $116.90 $110
6.165 Gas Detection Flat $241.35 $233.79 $221
6.166 Energy Storage Systems Flat $362.05 $350.69 $331
Special Events*
Special Event Permit
6.167 Plan Check Flat $191.35 $185.37 $175
6.168 Inspection Flat $241.35 $233.79 $221
Special Event Permit - With tents and or canopies > 400 square feet
6.169 Plan Check Flat $255.15 $247.16 $233
6.170 Inspection Flat $362.05 $350.69 $331
6.171 Carnivals and Fairs Base plus actual
costs $362.05 $350.69 $331
6.172 Fireworks Displays Base plus actual
costs $482.70 $467.57 $442
6.173 Film Making Base plus actual
costs $482.70 $467.57 $442
Annual Life Safety Inspections - All Occupancies other than R*
6.174 <3,600 Square Feet Flat $241.35 $233.79 $221
6.175 3,600 - 25,000 Square Feet Flat $422.35 $409.14 $386
6.176 25,000 - 50,000 Square Feet Flat $603.40 $584.47 $552
6.177 50,001 - 350,000 Square Feet Flat $663.75 $642.92 $607
6.178 >350,000 Square Feet Flat $1,267.15 $1,227.39 $1,159 14 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
Fire Life-Safety Inspections (Post-Development)
6.179 Fire annual Inspection (includes one re-inspection) Flat $241.35 $233.79 $221
6.180 2nd re-inspection Flat $482.70 $467.57 $442
6.181 3rd and subsequent re-inspections Flat $724.05 $701.37 $662
6.182 Fire Watch Inspection (Per Hour) Flat $241.35 $233.79 $221 R-1 Occupancies i.e. Hotels, Motels*
6.183 <25 units Flat $663.75 $642.92 $607
6.184 26-50 units Flat $784.40 $759.82 $717
6.185 51-75 units Flat $965.45 $935.16 $883
6.186 76-100 units Flat $1,086.10 $1,052.06 $993
6.187 >100 units Flat $1,267.15 $1,227.39 $1,159
R-2 (Apartment, Residential Permanent 3+)*
6.188 3-16 units Flat $362.05 $350.69 $331
6.189 17-25 units Flat $603.40 $584.47 $552
6.190 26-50 units Flat $784.40 $759.82 $717
6.191 51-75 units Flat $965.45 $935.16 $883
6.192 76-100 units Flat $1,086.10 $1,052.06 $993
6.193 >100 units Base $1,267.15 $1,227.39 $1,159
6.194 Per additional 10 units Per 10 units $40.20 $38.96 $37 R-2.1/R-4 Occupancies
6.195 Care Facility Residential State Licenses-6 or less Re-Inspection Fee Flat $241.35 $233.79 $221
6.196 Care Facility Commercial 0-50 State Licensed Flat $422.35 $409.14 $386
6.197 Care Facility Commercial 51-99 State Licensed Flat $543.05 $526.02 $497
6.198 Care Facility Commercial 100-150 State Licensed Flat $663.75 $642.92 $607
6.199 Care Facility Commercial ≥151 State Licensed Flat $844.75 $818.26 $773 Day Care Facilities Residential 8-14 Fire Clearance
6.200 Plan Check Flat $574.10 $556.11 $525
6.201 Inspection Flat $241.35 $233.79 $221
6.202 Day Care Facility Commercial 0-50 Flat $181.00 $175.34 $166
6.203 Day Care Facility Commercial 51-100 Flat $241.35 $233.79 $221
6.204 Day Care Facility Commercial 101-150 Flat $362.05 $350.69 $331
6.205 Day Care Facility Commercial >150 Flat $422.35 $409.14 $386
6.206 2nd re-inspection fee (after initial and first inspection) Flat $362.05 $350.69 $331
6.207 2nd re-inspection penalty Penalty $492.00 $476.56 $450
6.208 3rd plus re-inspection penalty Penalty $656.00 $635.42 $600 15 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
Hourly Rates $0.00
6.209 Inspection Hourly $241.35 $233.79 $221
6.210 Plan Review Hourly $255.15 $247.16 $233
6.211 Supplemental inspection fee (Per 1 hour or portion thereof) Hourly $241.35 $233.79 $221
6.212 Supplemental plan review (Per 1 hour or portion thereof) Hourly $255.15 $247.16 $233
6.213 After Hours or emergency Call-Out (2hr. Minimum = $448) Hourly $241.35 $233.79 $221
6.214 Other-Construction re-inspection fee Hourly $241.35 $233.79 $221 Other Fees
6.215 Certificate of Occupancy Inspection Flat $181.00 $175.34 $166 Commercial Emergency Evacuation Plan
6.216 Plan Check Flat $382.75 $370.74 $350
6.217 Inspection Flat $241.35 $233.79 $221
6.218 Lost Job Card Fee Flat $20.75 $20.12 $19
6.219 Defensible Space Inspections Flat $241.35 $233.79 $221
6.220 Non-Compliance Fee/Complaint Investigation Actual Cost Actual Cost Actual Cost Actual Cost Surcharges
6.221 Technology Surcharge Fee % of Building,
Planning Fire and 5.7% 5.7% 5.7%
7. BUILDING
Building Permit Fees
7.01 Permit Issuance Flat $59.75 $57.88 $55
7.02 Demolition* Flat $289.25 $280.22 $265
7.03 Wall/Fence, City Standard* Flat $89.80 $87.03 $82
7.04 Wall/Fence, Non-City Standard* Flat $179.65 $174.06 $164
7.05 Deck/Patio, City Standard* Flat $119.75 $116.04 $110
7.06 Deck/Patio, Non-City Standard* Flat $179.65 $174.06 $164
7.07 Swimming Pool/In-Ground Spa* Flat $581.75 $563.52 $532 Reroof*
7.08 Residential Flat $119.75 $116.04 $110
7.09 Commercial Per hour per
inspection $125.75 $121.84 $115
Windows / Doors*
7.10 Up to 5 windows / doors up to 5 windows $89.80 $87.03 $82
7.11 Each additional 5 windows / doors each additional
window $29.90 $29.01 $27
Other Fees:
16 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
7.12 Residential Accessory Structures (Up to 500 s.f. - including Garages)* $899.80 $871.58 $823
7.13 Accessory / Additional Dwelling Unit (ADU)+*(1) $2,866.70 $2,776.77 $2,622
7.14 Kitchen and / or Bath Remodel* Flat $618.35 $598.97 $566
7.15 Duplicate Inspection Card Flat $14.20 $13.78 $13
7.16 Duplicate Certificate of Occupancy Flat $59.75 $57.88 $55
7.17 Misc. Permit Hourly $152.75 $147.96 $140
7.18 Inspections not specified Hourly Rate $152.75 $147.96 $140
7.19 Re-inspections Hourly Rate $152.75 $147.96 $140
7.20 After Hours Inspections (4 hours minimum) OT Hourly Rate $176.80 $171.28 $162
7.99 Building Permit Refund Processing Fee
Fee will be based per
policy established by
Building Code 109.6
Fee will be based
per policy
established by
Building Code 109.6
SMIP Fee^ State Set
7.21 1-3 Story Residential Buildings*** Per $100,000
Valuation State Set 0.013% $0.00 $13
7.22 Commercial and Over 3 Story Residential Buildings*** Per $100,000 Valuation State Set 0.028% $0.00 $28
7.23 California State Building Standards Administration Special Revolving Fund*** $1- 25,000 State Set $1.00 $1.00 $1
$25,000 -50,000 State Set $2.00 $2.00
$50,001-75,000 State Set $3.00 $3.00
$75,001-100,000 State Set $4.00 $4.00
Every $25,000 or
fraction thereof
above $100,000
State Set $1.00 $1.00
Surcharges
7.24 General Plan Maintenance Fee % of Building Permit 9% 9% 9%
7.25 Technology Surcharge Fee % of Building,
Planning Fire and 5.7% 5.7% 5.7%
Plan Check Fee*
7.26 Single Family Residential % of Building Permit 65% 65% 65%
7.27 Multi-Family / Commercial / Industrial % of Building Permit 85% 85% 85% Single Family Residential - Inspection+*
7.28 $1 to $500 Flat $419.25 $406.14 $383.50
$501 to $2,000
17 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
7.29 First $500 Base $419.25 $406.14 $383.50
7.30 Each additional $100 or fraction thereof Each additional $46.90 $45.45 $42.92 $2,001 to $25,000
7.31 First $2,000 Base $1,123.10 $1,087.88 $1,027.24
7.32 Each additional $1,000 or fraction thereof Each additional $21.45 $20.81 $19.65 $25,001 to $50,000
7.33 First $25,000 Base $1,617.25 $1,566.54 $1,479.23
7.34 Each additional $1,000 or fraction thereof Each additional $40.10 $38.87 $36.71 $50,001 to $100,000
7.35 First $50,000 Base $2,620.60 $2,538.38 $2,396.90
7.36 Each additional $1,000 or fraction thereof Each additional $31.40 $30.46 $28.76 $100,001 to $500,000
7.37 First $100,000 Base $4,192.95 $4,061.41 $3,835.04
7.38 Each additional $1,000 or fraction thereof Each additional $8.20 $7.98 $7.53 $500,001 to $1,000,000
7.39 First $500,000 Base $7,487.45 $7,252.50 $6,848.28
7.40 Each additional $1,000 or fraction thereof Each additional $9.70 $9.43 $8.90 $1,000,001 +
7.41 First $1,000,000 Base $12,354.35 $11,966.64 $11,299.66
7.42 Each additional $1,000 or fraction thereof Each additional $4.85 $4.71 $4.45 Commercial / Multi-Family / Industrial - Inspection +*
7.43 $1 to $500 Flat $419.25 $406.14 $383.50
$501 to $2,000
7.44 First $500 Base $419.25 $406.14 $383.50
7.45 Each additional $100 or fraction thereof Each additional $56.85 $55.11 $52.05 $2,001 to $25,000
7.46 First $2,000 Base $1,272.85 $1,232.92 $1,164.21
7.47 Each additional $1,000 or fraction thereof Each additional $42.30 $40.99 $38.71 $25,001 to $50,000
7.48 First $25,000 Base $2,246.20 $2,175.75 $2,054.48
7.49 Each additional $1,000 or fraction thereof Each additional $35.90 $34.81 $32.87 $50,001 to $100,000
7.50 First $50,000 Base $3,144.75 $3,046.06 $2,876.28
7.51 Each additional $1,000 or fraction thereof Each additional $44.90 $43.51 $41.09 $100,001 to $500,000
18 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
7.52 First $100,000 Base $5,390.95 $5,221.81 $4,930.76
7.53 Each additional $1,000 or fraction thereof Each additional $8.95 $8.70 $8.22 $500,001 to $1,000,000
7.54 First $500,000 Base $8,984.95 $8,703.01 $8,217.94
7.55 Each additional $1,000 or fraction thereof Each additional $11.65 $11.31 $10.68 $1,000,001 to $5,000,000
7.56 First $1,000,000 Base $14,825.20 $14,359.97 $13,559.59
7.57 Each additional $1,000 or fraction thereof Each additional $4.15 $4.02 $3.80 $5,000,001 to $10,000,000
7.58 First $5,000,000 Base $31,447.45 $30,460.53 $28,762.77
7.59 Each additional $1,000 or fraction thereof Each additional $11.65 $11.31 $10.68 $10,000,001 +
7.60 First $10,000,000 Base $89,849.85 $87,030.09 $82,179.36
7.61 Each additional $1,000 or fraction thereof Each additional $5.80 $5.66 $5.34
7.62 Repeat Tract Home % of Building Permit 65% 65% 65% Electrical Permit Fees
7.63 Permit Issuance Flat $59.75 $57.88 $55
7.64 Residential Appliance, up to 1 HP* Flat $89.80 $87.03 $82
7.65 Non-Residential Appliances, up to 1 HP* Flat $89.80 $87.03 $82
7.66 Power Apparatus, less than 100 HP, KW, KVA, or KVAR* Flat $89.80 $87.03 $82
7.67 Power Apparatus, 100+ HP, KW, KVA, or KVAR* Flat $89.80 $87.03 $82
7.68 Temporary Power Pole* Flat $89.80 $87.03 $82
Services, Switchboards, Control Centers, & Panels*
7.69 Up to 400 amps for Single Family Residence Flat $89.80 $87.03 $82
7.70 Up to 400 amps for Non-Single Family Residence Flat $89.80 $87.03 $82
7.71 400+ amps Flat $179.65 $174.06 $164
7.72 Receptacle, Switch, Outlet, & Fixture, first* First $74.85 $72.52 $68
7.73 Receptacle, Switch, Outlet, & Fixture, each additional Each additional $2.95 $2.90 $3
7.74 Pole or Platform Mounted Fixtures, first* First $74.85 $72.52 $68
7.75 Pole or Platform Mounted Fixtures, each additional Each additional $2.95 $2.90 $3
7.76 Swimming Pool/In-Ground Spa* Flat $179.65 $174.06 $164
7.77 Meter Reset* Flat $89.80 $87.03 $82
7.78 Misc. Permit, Flat Fee, or Hourly as determined by staff Hourly $152.75 $147.96 $140
7.79 Inspections not specified Hourly Rate $152.75 $147.96 $140
7.80 Re-inspections Hourly Rate $152.75 $147.96 $140
19 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
7.81 After Hours Inspections (4 hours minimum) OT Hourly Rate $176.80 $171.28 $162 Mechanical Permit Fees
7.82 Permit Issuance Flat $59.75 $57.88 $55
7.83 Forced-Air or Gravity-Type Furnace or Burner* Flat $119.75 $116.04 $110
7.84 Suspended/Recessed Wall/Floor Mounted Heater* Flat $89.80 $87.03 $82 Air-Handling/Condensing Unit*
7.85 Single Family Residence Flat $89.80 $87.03 $82
7.86 Non-Single Family Residence Flat $119.75 $116.04 $110
7.87 Hood served by Mechanical Exhaust* Flat $119.75 $116.04 $110
7.88 Boilers, Compressors, and Absorption Systems* Flat $119.75 $116.04 $110
7.89 Misc. Permit, Flat Fee, or Hourly as determined by staff Hourly $152.75 $147.96 $140
7.90 Inspections not specified Hourly Rate $152.75 $147.96 $140
7.91 Re-inspections Hourly Rate $152.75 $147.96 $140
7.92 After Hours Inspections (4 hours minimum) OT Hourly Rate $176.80 $171.28 $162 Plumbing Permit Fees
7.93 Permit Issuance Flat $59.75 $57.88 $55
7.94 Plumbing Fixtures and Vents, fixtures 1-3 (total cost)* Flat $74.85 $72.52 $68
7.95 Plumbing Fixtures and Vents, each additional fixture Each additional $2.95 $2.90 $3
7.96 Grease Interceptor* Flat $29.90 $29.01 $27
7.97 Gas System* Flat $119.75 $116.04 $110
Piping/Re-piping
7.98 Single Family Residential* Flat $89.80 $87.03 $82
7.99 Multi-Family Residential, first dwelling unit* First $89.80 $87.03 $82
7.100 Multi-Family Residential, each additional unit Each additional $14.95 $14.50 $14
7.101 Water Heater* Flat $89.80 $87.03 $82
7.102 Tankless Water Heater* Flat $159.25 $154.29 $146
7.103 Solar Water Heating System* Flat $179.65 $174.06 $164
7.104 Sewer / Septic* Flat $89.80 $87.03 $82
7.105 Misc. Permit, Flat Fee, or Hourly as determined by staff Hourly $152.75 $147.96 $140
7.106 Inspections not specified Hourly Rate $152.75 $147.96 $140
7.107 Re-inspections Hourly Rate $152.75 $147.96 $140
7.108 After Hours Inspections (4 hours minimum) OT Hourly Rate $176.80 $171.28 $162 Solar Permit Fees (State Fees)^*
7.109 Residential - up to 15kw Base State Set $382.50 $405.08 $383
7.110 Each additional kw Per kw State Set $15.00 $15.44 $15 20 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
7.111 Commercial - up to 50kw Base State Set $700.00 $741.32 $700
7.112 Commercial - 51-250kw - per kw Per kw State Set $7.00 $7.21 $7
7.113 Commercial - 250kw+ - per kw Per kw State Set $5.00 $5.15 $5 Planning Support - Building Plan Check*
7.114 New Construction Flat $984.00 $953.12 $900
7.115 Tenant Improvements / Remodels Flat $409.95 $397.13 $375 Engineering Support - Building Plan Check*
7.116 New Single Family Residence Flat $1,256.20 $1,216.82 $1,149
7.117 New Commercial Office Flat $837.50 $811.22 $766
7.118 New Multi-Family Residence Flat $1,256.20 $1,216.82 $1,149
7.119 All Other Projects Flat $327.95 $317.70 $300
Fire Support - Building Plan Check and Inspection*
Development Plan Check and Inspections (Residential-New and 0-1,999 Square Feet
7.120 Plan Check Flat $255.15 $247.16 $233
7.121 Inspection Flat $241.35 $233.79 $221
2,000-4,999 Square Feet
7.122 Plan Check Flat $318.95 $308.95 $292
7.123 Inspection Flat $301.70 $292.24 $276
5,000-9,999 Square Feet
7.124 Plan Check Flat $382.75 $370.74 $350
7.125 Inspection Flat $362.05 $350.69 $331
10,000-24,999 Square Feet
7.126 Plan Check Flat $446.50 $432.53 $408
7.127 Inspection Flat $422.35 $409.14 $386
25,000-49,999 Square Feet
7.128 Plan Check Flat $574.10 $556.11 $525
7.129 Inspection Flat $543.05 $526.02 $497
50,000-100,000 Square Feet
7.130 Plan Check Flat $701.70 $679.69 $642
7.131 Inspection Flat $663.75 $642.92 $607
>100,000 Square Feet
7.132 Plan Check Flat $893.05 $865.06 $817
7.133 Inspection Flat $844.75 $818.26 $773
Hazardous Use by Square Footage (New Construction or added space 21 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
0-1,999 Square Feet
7.134 Plan Check Flat $255.15 $247.16 $233
7.135 Inspection Flat $241.35 $233.79 $221
2,000-4,999 Square Feet
7.136 Plan Check Flat $446.50 $432.53 $408
7.137 Inspection Flat $422.35 $409.14 $386
5,000-9,999 Square Feet
7.138 Plan Check Flat $637.90 $617.90 $583
7.139 Inspection Flat $603.40 $584.47 $552
10,000-24,999 Square Feet
7.140 Plan Check Flat $765.50 $741.48 $700
7.141 Inspection Flat $724.05 $701.37 $662
25,000-49,999 Square Feet
7.142 Plan Check Flat $956.85 $926.85 $875
7.143 Inspection Flat $905.10 $876.71 $828
50,000-100,000 Square Feet
7.144 Plan Check Flat $1,084.45 $1,050.43 $992
7.145 Inspection Flat $1,025.80 $993.61 $938
>100,000 Square Feet
7.146 Plan Check Flat $1,275.80 $1,235.80 $1,167
7.147 Inspection Flat $1,206.80 $1,168.95 $1,104
Shell Buildings for All Commercial Uses (New Construction or added 0-1,999 Square Feet
7.148 Plan Check Flat $255.15 $247.16 $233
7.149 Inspection Flat $241.35 $233.79 $221
2,000-4,999 Square Feet
7.150 Plan Check Flat $318.95 $308.95 $292
7.151 Inspection Flat $301.70 $292.24 $276
5,000-9,999 Square Feet
7.152 Plan Check Flat $382.75 $370.74 $350
7.153 Inspection Flat $362.05 $350.69 $331
10,000-24,999 Square Feet
7.154 Plan Check Flat $446.50 $432.53 $408
7.155 Inspection Flat $422.35 $409.14 $386
25,000-49,999 Square Feet
22 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
7.156 Plan Check Flat $574.10 $556.11 $525
7.157 Inspection Flat $543.05 $526.02 $497
50,000-100,000 Square Feet
7.158 Plan Check Flat $701.70 $679.69 $642
7.159 Inspection Flat $663.75 $642.92 $607
>100,000 Square Feet
7.160 Plan Check Flat $893.05 $865.06 $817
7.161 Inspection Flat $844.75 $818.26 $773
Buildings for Commercial Uses (New Construction or added Space for 0-1,999 Square Feet
7.162 Plan Check Flat $255.15 $247.16 $233
7.163 Inspection Flat $241.35 $233.79 $221
2,000-4,999 Square Feet
7.164 Plan Check Flat $318.95 $308.95 $292
7.165 Inspection Flat $301.70 $292.24 $276
5,000-9,999 Square Feet
7.166 Plan Check Flat $382.75 $370.74 $350
7.167 Inspection Flat $362.05 $350.69 $331
10,000-24,999 Square Feet
7.168 Plan Check Flat $446.50 $432.53 $408
7.169 Inspection Flat $422.35 $409.14 $386
25,000-49,999 Square Feet
7.170 Plan Check Flat $574.10 $556.11 $525
7.171 Inspection Flat $543.05 $526.02 $497
50,000-100,000 Square Feet
7.172 Plan Check Flat $701.70 $679.69 $642
7.173 Inspection Flat $663.75 $642.92 $607
>100,000 Square Feet
7.174 Plan Check Flat $893.05 $865.06 $817
7.175 Inspection Flat $844.75 $818.26 $773
Tenant Improvement (New Construction, Additions and Major Remodels for All Occupancies other than H and R)
0-1,999 Square Feet
7.176 Plan Check Flat $255.15 $247.16 $233
7.177 Inspection Flat $241.35 $233.79 $221
23 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
2,000-4,999 Square Feet
7.178 Plan Check Flat $318.95 $308.95 $292
7.179 Inspection Flat $301.70 $292.24 $276
5,000-9,999 Square Feet
7.180 Plan Check Flat $382.75 $370.74 $350
7.181 Inspection Flat $362.05 $350.69 $331
10,000-24,999 Square Feet
7.182 Plan Check Flat $446.50 $432.53 $408
7.183 Inspection Flat $422.35 $409.14 $386
25,000-49,999 Square Feet
7.184 Plan Check Flat $574.10 $556.11 $525
7.185 Inspection Flat $543.05 $526.02 $497
50,000-100,000 Square Feet
7.186 Plan Check Flat $701.70 $679.69 $642
7.187 Inspection Flat $663.75 $642.92 $607
>100,000 Square Feet
7.188 Plan Check Flat $893.05 $865.06 $817
7.189 Inspection Flat $844.75 $818.26 $773
7.20 Tenant Improvement (TI) Fees
(Commercial/Multi-Family/Industrial)
Project
Valuation/Valuation
Multiplier
($0-$5,900)/$199 Flat
Fee
$5,701-$25,000/.033
Valuation Multiplier
$25,001-$50,000/.020
Valuation Multiplier
$50,001-$250,000/.010
Valuation Multiplier
$250,001-$500,000/.009
Valuation Multiplier
Project
Valuation/Valuation
Multiplier
($0-$5,900)/$199 Flat
Fee
$5,701-$25,000/.033
Valuation Multiplier
$25,001-$50,000/.020
Valuation Multiplier
$50,001-
$250,000/.010
Valuation Multiplier
$250 001-
N/A
8. PLANNING
Flat Fees
8.01 Accessory Dwelling Unit* Flat $2,974.95 $2,881.61 $2,721 Appeal
8.02 Appeal - 1st Flat $4,123.45 $3,994.06 $3,771
24 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
8.03 Appeal - 2nd Flat $3,603.00 $3,489.96 $3,295
Conditional Use Permit*
8.04 Major Flat $16,562.90 $16,043.11 $15,149
8.05 Major Revision Flat $8,281.40 $8,021.55 $7,574
8.06 Minor Flat $4,586.80 $4,442.90 $4,195
8.07 Minor Revision Flat $3,440.10 $3,332.18 $3,146
8.08 Environmental Assessment/Negative Declaration Flat $7,603.35 $7,364.77 $6,954
8.09 Environmental Determination (All Disc. Apps) Flat $341.20 $330.52 $312
8.10 Film Permit (< 3 Days) Flat $109.30 $105.90 $100
8.11 Final Site Development* Flat $6,158.80 $5,965.52 $5,633
8.12 Home Based Business Flat $230.45 $223.25 $211
8.13 Land Division Phasing Map* Flat $8,653.30 $8,381.76 $7,915 Landscape Plan Review*
8.14 Commercial Flat $3,046.55 $2,950.97 $2,786
8.15 Industrial Flat $2,589.55 $2,508.33 $2,369
8.16 Front Yard Typicals Flat $2,093.30 $2,027.62 $1,915
8.17 Open Space Flat $4,531.85 $4,389.67 $4,145
8.18 Landscape Inspection Flat $617.05 $597.69 $564
8.19 Minor Exception Flat $568.25 $550.43 $520
8.20 Mobile Food Trucks* Flat $762.30 $738.42 $697
8.21 Multi-Family Ministerial Review - SB35* Flat $12,654.30 $12,257.20 $11,574
8.22 New Business Regulation Review Flat $44.80 $43.42 $41
8.23 Noise Exception - Single Event* Flat $750.65 $727.12 $687
8.24 Public Convenience & Necessity W/O CUP* Flat $2,880.75 $2,790.39 $2,635
8.25 Planning Commission Hearing Flat $3,508.00 $3,397.93 $3,209
8.26 Planning Review Fee* Flat $203.40 $197.05 $186
Plot Plan - Major*
8.27 Major Flat $32,106.00 $31,098.44 $29,365
8.28 Revision Flat $16,053.00 $15,549.22 $14,683
Plot Plan - Minor*
8.29 Minor (New Development) Flat $5,105.55 $4,945.35 $4,670
8.30 Revision Flat $3,829.15 $3,709.01 $3,502
8.31 Detached Accessory Structure* Flat $2,885.85 $2,795.33 $2,640
8.32 Model Home Complex (Includes Sign Pkg)* Flat $3,433.95 $3,326.22 $3,141
8.33 Shipping Containers* Flat $855.10 $828.29 $782
25 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
8.34 Tree Removal / Replacement Permit* Flat $1,236.05 $1,197.27 $1,131
8.35 Wall & Fence Plan Review* Flat $3,389.10 $3,282.76 $3,100
8.36 Pre-Application Review Flat $2,733.35 $2,647.57 $2,500
8.37 Pre-Existing Non-Conforming Use Verification* Flat $1,827.35 $1,770.04 $1,671
8.38 Reasonable Accommodation* Flat $1,689.20 $1,636.20 $1,545
8.39 SB9 Urban Lot Split Fee* Flat $5,506.05 $5,333.26 $5,036
8.40 Sidewalk Vending Permit Application* Flat $759.85 $736.02 $695
8.41 Sign Admin Relief Review* Flat $688.80 $667.19 $630 Sign Permit*
8.42 Affixed To Building Flat $323.60 $313.48 $296
8.43 Monument - Comm / Ind / Res Flat $1,181.00 $1,143.96 $1,080
8.44 Temporary (Commercial) Flat $230.55 $223.32 $211
8.45 Sign Program* Flat $3,591.35 $3,478.67 $3,285
8.46 Sign Program Amendment* Flat $859.70 $832.72 $786
8.47 Similar Use Determination * Flat $1,864.95 $1,806.43 $1,706
8.48 Site Plan Conceptual Review Flat $4,342.35 $4,206.11 $3,972
8.49 Small Wireless Facility/Eligible Facilities Request* Flat $4,407.20 $4,268.91 $4,031
8.50 Substantial Conformance* Flat $4,311.50 $4,176.22 $3,943 Tentative Parcel Map*
8.51 Commercial / Industrial Flat $15,145.45 $14,670.15 $13,852
8.52 Finance Flat $8,508.40 $8,241.38 $7,782
8.53 Residential Flat $15,145.45 $14,670.15 $13,852
8.54 Revised Flat $11,359.10 $11,002.62 $10,389
8.55 Minor Condition Change Flat $5,679.55 $5,501.31 $5,195 Time Extension*
8.56 City Approved Project Flat $4,427.50 $4,288.58 $4,050
8.57 Plot Plan (5-10 Yrs) Flat $7,562.30 $7,325.01 $6,917 Temporary Use Permit*
8.58 Major**** Flat $642.00 $2,149.91 $2,030
8.59 Major (501C)**** Flat $321.00 $1,074.96 $1,015
8.60 Minor**** Flat $208.00 $1,215.87 $1,148
8.61 Minor (501C)**** Flat $104.00 $607.93 $574
Variance*
8.62 Filed Alone Flat $6,134.85 $5,942.35 $5,611
8.63 Filed With Other Applications Flat $2,850.25 $2,760.83 $2,607 26 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
8.64 Zoning Information Letter Flat $516.35 $500.18 $472
8.65 Additional Plan Check % of Application Fee 25.00% 25.00% 25%
8.66 Technology Surcharge Fee % of Building,
Planning Fire and 6.00% 5.7% 5.7%
8.67 Planning Application Refund Processing Fee
Deposit Based Fees*
8.67 Surface Mining & Reclamation Act Deposit Yes $20,000.00 $20,000.00 $20,000
8.68 Annexation Request Deposit Yes $20,000.00 $20,000.00 $20,000
8.69 Zone Change Deposit Yes $5,000.00 $5,000.00 $5,000
8.70 Development Agreement Deposit Yes $10,000.00 $10,000.00 $10,000
8.71 EIR Review Deposit Yes $20,000.00 $20,000.00 $20,000
8.72 Expedited Environmental Habitat Review Deposit Yes $1,500.00 $1,500.00 $1,500
8.73 General Plan Amendment Deposit Yes $10,000.00 $10,000.00 $10,000
8.74 Planned Unit Development Deposit Yes $10,000.00 $10,000.00 $10,000
8.75 Specific Plan Deposit Yes $20,000.00 $20,000.00 $20,000
8.76 Specific Plan Amendment Deposit Yes $10,000.00 $10,000.00 $10,000
8.77 Sphere Of Influence Amendment Deposit Yes $10,000.00 $10,000.00 $10,000
8.78 Study Review/Scoping Agreement Deposit Yes $1,000.00 $1,000.00 $1,000
8.79 Ag Preserve Cancellation Deposit Yes $5,000.00 $5,000.00 $5,000
8.80 Tentative Tract Map Deposit Yes $20,000.00 $20,000.00 $20,000
8.81 Tentative Tract Map - Revision Deposit Yes $10,000.00 $10,000.00 $10,000
8.82 Historic Property Preservation Deposit Yes $5,000.00 $5,000.00 $5,000
8.83 Hazardous Waste Facility Siting Permit Deposit Yes $20,000.00 $20,000.00 $20,000
8.84 Hog Ranch Processing Deposit Yes $10,000.00 $10,000.00 $10,000
8.85 Noise Exception - On-Going Event Deposit Yes $5,000.00 $5,000.00 $5,000
8.86 MSHCP HANS Deposit Yes $2,000.00 $2,000.00 $2,000
9. ENGINEERING
Rough Grading / Drainage Plan Check (Single Family Residence)*
9.01 1-50 Lots Flat $4,201.15 $4,069.35 $3,843
9.02 51-75 Lots Flat $11,921.40 $11,547.27 $10,904
9.03 75- 200 Lots Flat $17,681.00 $17,126.15 $16,172
9.04 200+ Lots Deposit $21,866.75 $21,180.52 $20,000
Precise Grading / Drainage Plan Check (Single Family Residence)*
9.05 1-50 Lots Flat $4,015.05 $3,889.05 $3,672
9.06 51-75 Lots Flat $6,670.10 $6,460.78 $6,101
9.07 75- 200 Lots Flat $14,300.40 $13,851.64 $13,080
27 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
9.08 200+ Lots Deposit $16,400.05 $15,885.39 $15,000
9.09 Standalone Single Family Grading Flat $5,990.95 $5,802.94 $5,480 Rough Grading/Drainage Plan Check (Multiple Family Residence, Commercial, Industrial)*
9.10 0-50K Sqft Flat $7,409.85 $7,177.35 $6,777
9.11 >50K-100K Sqft Flat $9,464.85 $9,167.84 $8,657
9.12 >100K-500K Sqft Flat $10,949.40 $10,605.78 $10,015
9.13 >500K-1mil Sqft Flat $12,923.30 $12,517.74 $11,820
9.14 >1mil+ Sqft Deposit Yes $15,000 $15,000.00 $15,000 Precise Grading/Drainage Plan Check (Multiple Family Residence, Commercial, Industrial)*
9.15 0-50K Sqft Flat $7,245.75 $7,018.38 $6,627
9.16 >50K-100K Sqft Flat $10,605.45 $10,272.64 $9,700
9.17 >100K-500K Sqft Flat $15,707.90 $15,214.96 $14,367
9.18 >500K-1mil Sqft Flat $17,312.65 $16,769.37 $15,835
9.19 >1mil+ Sqft Deposit Yes $20,000.00 $20,000.00 $20,000
9.20 Plan Check Revision Deposit Yes $10,000.00 $10,000.00 $10,000
9.21 Extra Plan Check 1/4 Initial Fee 1/4 Initial Fee 1/4 Initial Fee Encroachment and Public Improvements*:
9.22 Encroachment Permit Issuance Per Permit $112.30 $108.80 $103
9.23 Encroachment Plan Review Base $646.10 $625.84 $591
9.24 Per plan sheet Per Plan Sheet $323.05 $312.93 $295 Encroachment Permits*:
9.25 Permits per Event under existing annual permit Flat $66.05 $64.00 $60
9.26 Permits for One Day Work Flat $473.80 $458.95 $433
9.27 Permits Exceeding One Day Work Base $473.80 $458.95 $433
9.28 Permits for Major Projects Deposit Yes $1,500.00 $1,500.00 $1,500
9.29 Permits for One Day Work, Multiple Locations Deposit Yes $513 $512.56 $513
9.30 Permits for Night-Time Work Base $601.30 $582.43 $550
9.31 Additional Review (Traffic Control) Per Hour $173.15 $167.73 $158
9.32 Additional Inspection Per Hour $150.30 $145.61 $137 Public Improvement Plan Review*: (Assumes up to 3 plan reviews, anything beyond 3 would be charged time and material).
9.33 $0-$500,000 Base $9,362.80 $9,068.99 $8,564
9.34 $500,000 Base $9,362.80 $9,068.99 $8,564
9.35 Per $1,000 Each Add'l $9.60 $9.32 $8.80
28 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
9.36 $1,000,000 Base $14,171.35 $13,726.61 $12,962
9.37 Per $1,000 Each Add'l $3.20 $3.12 $2.95
9.38 $5,000,000 Base $27,052.90 $26,203.94 $24,743
9.39 Per $1,000 Each Add'l $1.35 $1.33 $1.25
9.40 $10,000,000 Base $33,883.45 $32,820.11 $30,991
9.41 Per $1,000 Each Add'l $1.40 $1.38 $1.30
9.42 $25,000,000 Base $55,257.75 $53,523.62 $50,540
9.43 Per $1,000 Each Add'l $0.70 $0.69 $0.65
9.44 Public Improvement Inspection* Base Deposit $0.00 $0.03 3%
9.45 Landscaping Improvements* Each $4,898.10 $4,744.43 $4,480
9.46 Neighborhood Park* Per Application $11,024.55 $10,678.61 $10,083
9.47 Community Park* Per Application $14,366.65 $13,915.80 $13,140
9.48 Regional Park* Per Application $16,911.55 $16,380.82 $15,468
9.49 Signing & Striping (if not included in the street improvement plans)* Base $2,713.50 $2,628.38 $2,482
9.50 Per Sheet* Per Sheet $484.55 $469.39 $443
9.51 Traffic Signal* Per Signal $6,419.05 $6,217.63 $5,871
9.52 Minor Modification of Traffic Signals* Per Signal $2,977.85 $2,884.42 $2,724
9.53 Plan Check Revision Deposit Yes $10,000 $10,000.00 $10,000
9.54 Extra Plan Check 1/4 of Initial Fee 1/4 of Initial Fee 1/4 of Initial Fee 1/4 of Initial Fee Grading/Drainage Inspection*
9.55 Residential up to 1 acre Flat $2,060.90 $1,996.26 $1,885
9.56 Residential 1+ acres Deposit Yes $3,000 $3,000.00 $3,000 Traffic Engineering Exhibits*
9.57 Traffic Control Plan Per Plan Sheet $49.15 $47.65 $45
9.58 Per Sheet Per Sheet $362.75 $351.39 $332
9.59 Trip Generation Letter Base $917.05 $888.31 $839
9.60 Per study Per Study $1,174.65 $1,137.82 $1,074
9.61 Small Study (<500 ADT) Base $917.05 $888.31 $839
9.62 Per study Per Study $2,072.95 $2,007.92 $1,896
9.63 Typical TIA (500-1,000 ADT) Base $917.05 $888.31 $839
9.64 Per study Per Study $3,454.90 $3,346.52 $3,160
9.65 Large TIA (1,000+ ADT) Base $917.05 $888.31 $839
9.66 Per study Per Study $5,527.90 $5,354.43 $5,056
9.67 Parking Study Base $917.05 $888.31 $839
9.68 Per study Per Study $2,936.70 $2,844.54 $2,686
29 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
Final Parcel Maps
9.69 Residential Parcel Map* Per Map $10,984.30 $10,639.58 $10,047 Commercial/Industrial Parcel Map*
9.70 <20 acres Base Per Map $14,473.45 $14,019.25 $13,238
9.71 Per additional acre Per Additional Acre $128.45 $124.43 $118 Final Tract Map*
9.72 5-20 Lots Per Map $10,352.90 $10,028.04 $9,469
9.73 21-50 Lots Per Map $15,006.90 $14,535.98 $13,726
9.74 51-100 Lots Per Map $19,775.65 $19,155.03 $18,087
9.75 100+ Lots Deposit Yes $20,000 $20,000.00 $20,000
9.76 Amendment to final map Per Application $6,292.50 $6,095.03 $5,755 Survey/Mapping Review*
9.77 Lot Line Adjustment / Merger Per Application $4,622.95 $4,477.87 $4,228
9.78 Survey Monument Field Inspection Base $603.70 $584.79 $552
9.79 Plus deposit determined by staff with charges for actual outside costs Deposit
9.80 Record of Survey Plan Check Per Plan Sheet $3,466.00 $3,357.27 $3,170
9.81 Condominium Conversion Review Initial deposit plus any outside costs
9.82 Certificate of Compliance Per Application $3,872.20 $3,750.69 $3,542
9.83 Substantial Compliance Per Application $2,160.55 $2,092.76 $1,976
9.84 Reversion to Acreage Per Application $3,949.25 $3,825.34 $3,612
9.85 Certificate of Correction Issuance Per Application $3,079.75 $2,983.10 $2,817
9.86 Vacation Per Application $4,987.10 $4,830.63 $4,561
9.87 Initial deposit if involving Public Road currently in use with charges at the fully allocated hourly rates of involved personnel plus any outside costs Deposit Yes $10,000.00 $10,000.00 $10,000
9.88 Quitclaim Per Application $3,364.15 $3,258.62 $3,077
9.89 Easement Processing Per Application $3,335.30 $3,230.66 $3,051
9.90 Parking Covenant Review Per Application $2,828.75 $2,740.01 $2,587
9.91 CC&R Deposit Yes $3,000.00 $3,000.00 $3,000
Water Quality/Stormwater*
Preliminary Water Quality Management Plan Review (WQMP)*
9.92 Small Flat $4,662.60 $4,516.29 $4,265
9.93 Medium Flat $6,445.10 $6,242.87 $5,895
9.94 Large Flat $7,292.55 $7,063.69 $6,670
9.95 Final WQMP w/ Approved Prelim Per Application $6,575.60 $6,369.24 $6,014 30 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
Final WQMP w/o Approved Prelim*
9.96 Small Flat $3,890.30 $3,768.24 $3,558
9.97 Medium Flat $4,762.25 $4,612.81 $4,356
9.98 Large Flat $6,475.85 $6,272.65 $5,923
Stormwater Inspection: Commercial / Industrial Businesses*
9.99 Low Priority Per Inspection $412.80 $399.86 $378
10.00 Medium/High Priority Per Inspection $615.50 $596.22 $563 Reports/Studies
9.100 Drainage Study Deposit Yes $2,500.00 $2,500.00 $2,500
9.101 Geotechnical Study Flat $2,093.70 $2,028.02 $1,915
9.102 ESA Flat $1,229.30 $1,190.73 $1,124
9.103 Traffic Scoping Study Deposit Yes $1,915 $1,914.99 $1,915 Special Districts*
9.104 CFD/LMD Annexation Per Application $2,867.75 $2,777.77 $2,623
9.105 Plus initial deposit determined by staff with charges for any outside or legal costs Deposit Yes $5,000.00 $5,000.00 $5,000
9.106 CFD/Assessment District Audit Initial deposit Yes $10,000.00 $10,000.00 $10,000
9.107 Assessment District Formation Initial deposit Yes $20,000.00 $20,000.00 $20,000
9.129 CFD/LMD Annexation (Public Safety) Per Application $2,698.00
9.130
Plus initial deposit determined by staff with charges for any outside or legal costs
(1-20 Units)
Deposit Yes $6,250.00
9.131
Plus initial deposit determined by staff with charges for any outside or legal costs
(> 20 Units)
Deposit Yes $12,500.00
Bonds
9.108 Bond Release Base $1,332.15 $1,290.35 $1,218
9.109 Plus deposit determined by staff with actual charges for GIS database changes and inspections Deposit Yes $2,000.00 $2,000.00 $2,000
9.110 Bond Reduction Base $1,558.30 $1,509.40 $1,425
9.111 Plus deposit determined by staff with actual charges for GIS database changes and inspections Deposit Yes Actual Cost Actual Cost $3,000
9.112 Bond Replacement Base $1,332.15 $1,290.35 $1,218
9.113 Plus deposit determined by staff with actual charges for GIS database changes and inspections Deposit Yes $2,000.00 $2,000.00 $2,000 31 of 32
CITY OF MENIFEE EXHIBIT B: 2022 USER FEE SCHEDULE (WITH 2026 ADJUSTMENT EFFECTIVE 7/1/2026) 7/1/2026 Fee
(CPI)
Fee
No. 2022 Adopted FeeFee Title 2025 Adopted Fee
(7/1/2025)
Deposit Based
Fee (2) or State/Federal
Set
Unit
9.114 Initial Bond Posting $2,000 Deposit $1,903.05 $1,843.37 $1,741 Misc Services
9.115 TUMF Audit Initial deposit Yes $10,000.00 $10,000.00 $10,000
9.116 Misc. Engineering Agreements Initial deposit Yes $10,000.00 $10,000.00 $10,000
9.117 City Property Acquisition Process* Base $2,748.70 $2,662.47 $2,514
9.118 Plus initial deposit with charges for any outside costs Deposit Yes $5,000.00 $5,000.00 $5,000
9.119 Street Name Change* Flat $860.50 $833.52 $787
9.120 Block Party Processing* Per Application $466.80 $452.18 $427 Wide and Overload Permit^ State Set
9.121 Daily Per Permit State Set $16.00 $16.00 $16
9.122 Annual Per Permit State Set $90.00 $90.00 $90
Other Fees:
9.123 Haul Route Review Flat $937.80 $908.37 $858
9.124 Misc Planning/Engineering Review Deposit Yes $5,000 $5,000.00 $5,000
9.125 Borrow Site Plan Check* Per Application $1,408.55 $1,364.37 $1,288
9.126 Stockpile Plan Check* Per Application $1,480.90 $1,434.43 $1,354
9.127 Stockpile/Borrow Site Inspection* Deposit Yes $587 $587 $587
9.128 Technology Surcharge Fee % of Building,
Planning Fire and 5.7% 5.7% 5.7%
^ State / Federally Regulated or Set Fee
+
* Subject to Technology Fee.
(1)
(2)
Note:
***
**** Revised/New fees adopted 4/15/2026, effective 7/1/2026, first automatic CPI adjustment, if applicable, effective 7/1/2027.
Corrected/updated to match actual state applied fees. Historical application matches state fees.
All permits in this fee schedule assume a standard scope of work. If any project or application falls outside of the typical or standard scope of work, the Community Development Director or Public Works Director has the discretion to charge time and materials for that application or project.
The Building Division's ADU Permit is inclusive of both plan check and permit and all MEPs.
Subject to General Plan Maintenance Fee - but only if new construction or major redevelopment. Other valuation-based projects such as smaller additions may not be eligible.
Legend & Notes:
Begininning 7/1/2025, All Deposit Based Fees will be reverted and maintained at the 2022 adopted fee amount, and exempt from annual adjustments. 32 of 32