Vendor Name Contract # PO # Department Contract Name Execution Date Amendment Type
Amend /
Change
Order
Number
Contract Amount
Before Amendment /
Change Order
Amendment /
Change Order
Revised
Amount
Term of
Agreement Revised Term Description of Change
Parsons Transporation Group 2024-0055 Various PO's
Public Works &
Engineering
Master Agreement for Traffic Engineering
Review 4/1/2026
Professional
Services 3 450,000.00 45,000.00 495,000.00 1/1/2023 -
6/30/2026 No Change
To cover Traffic Engineering Review Services for the
remainder of the fiscal year
KRGS Roofing, Inc 20260162 26100385
Community
Services
CIP 26-07 Kay Ceniceros Senior Center
Roof Rehabilitation 4/8/2026
Contract
Services 1 30,500.00 2,500.00 33,000.00 2/20/2026 -
12/31/2026 No Change
To apply an additional layer of silicone coating over
designated walk paths and existing traffic pads
Liebert Cassidy Whitemore 20260021 26100074 Human Resource Section 125 Document Review 4/21/2026 Professional
Services 1 27,000.00 6,201.00 33,201.00 6/7/2025 -
6/30/2026 No Change Expansion of the scope of services
Axon 20250164 26000740 Police Department Axon Master Agreement 4/23/2026 Master 3 7,167,972.40 51,717.38 7,219,689.78 3/1/2025 -
6/30/2035 No Change Adding the Drone Monitoring Access
All Traffic Solution 20250141 261000263
Information
Technology
All Trfafic Solutions Software
Subscription Agreement 4/24/2026 Software 2 17,212.50 13,701.84 30,914.34 10/22/2024 -
12/2/2027 No Change Adding two Additional Traffic Signs SSD 2024-0174 26100495
Information
Technology
Master Agreement for Burglar & Fire
Alarm 5/7/2026 Master 3 267,704.88 2,038.58 269,743.46 12/6/23 -
12/31/2028 No Change Upgrading Fire Station 5 burglar alarm B Riley now Risk Solutions 20250081 Pending
Information
Technology
Disaster Recovery &Bus Cont Planning
System Lic 5/11/2026 Software 1 49,500.00 - 49,500.00 3/1/2024 -
2/28/2027 No Change Processing a legal name change
Matisynn Johnson 20260051 27100018 CEO Menifee Matters Design and Collateral 5/15/2026 Professional
Services 1 39,600.00 10,200.00 49,800.00 7/1/2025 -
6/30/2027 No Change Additional Scope of Work
Bogh Engineering, LLC 20250204 25100671
Public Works &
Engineering
CIP 20-13 Paloma Wash Pedestrian
Bridge Project 5/26/2026
Contract
Services 2 2,723,506.70 40,577.66 2,764,084.36 6/17/2025 -
12/9/2025 No Change
To remove, relocate, and reweld all thread modified
column studs
Howard Blackson Urban Design 20260086 26100237
Community
Development
As Needed Planning Services for
Interconnected Projects 5/28/2026
Professional
Services 1 50,000.00 10,000.00 60,000.00 9/25/2025 -
6/30/2026 9/25/2025-10/28/2026
To support ongoing, as needed planning services for
interconnected projects.
EPD Solutions, Inc 2023-0150 24100057
Community
Development
CEQA Ares Murrieta Road Warehouse
Project (CQA22-0022) 5/28/2026
Professional
Services 6 394,068.00 6,000.00 400,068.00 11/11/2022 -
6/30/2026 11/11/2022-12/31/2026
To support preparation of a thorough response to the
comment letter, including any necessary follow-up
from legal review and potential additional community
responses
Riverside County Transportation
Commission 20260250 N/A
Community
Services Specialized Transit Pilot Project 6/3/2026
Professional
Services 2 150,000.00 - 150,000.00 10/24/2022 -
6/30/2026 10/24/2022-12/31/2026
To continue providing transportation services and
emergency ride vouchers for senior and disabled
residents
MIG 2022-0039 24100043
Community
Development
CEQA Menifee Village Specific Plan
Amendment (SPA)
6/4/2026
Professional
Services 6 134,705.00 - 134,705.00 7/1/2021 -
6/30/2026
7/1/2021-12/31/2026 To allow additional time for the work to be conducted Kimley Horn & Associates, Inc 2022-0119 24100059
Community
Development
CEQA Panattoni Industrial Island 6
Project
6/4/2026
Professional
Services 5 572,865.00 - 572,865.00 9/16/2021 -
6/30/2026
9/16/2021-12/31/2026 To allow additional time for the work to be conducted In-Site Landscape Architecture, Inc 20260070 26100165
Community
Services
CIP 24-16 Quail Valley Park Project for
Professional Landscape Design Services 6/5/2026
Professional
Services 1 159,683.50 2,750.00 162,433.50 8/20/2025 -
12/31/2026 8/20/2025-12/31/2026
To proceed with Final Water Quality Management Plan
(FWQMP) in support of the project's final engineering
design
Optimus Oprimorum 20260002 2610073 Human Resource As Needed Investigation Services 6/9/2026 Professional
Services 1 24,900.00 - 24,900.00 7/1/2025 -
6/30/2026 7/1/2025-10/28/2026
Extend Agreement 120 days to allow additional time
for services to be provided
MIG 2023-0185 24100049
Community
Development
CEQA Goetz and Ethanac Commercial
Center Project (CQA22-0016) 6/9/2026
Professional
Services 4 118,333.00 - 118,333.00 1/1/2023 -
6/30/2026 1/1/2023-12/31/2026 To allow additional time for the work to be conducted Dudek 2023-0255 24100038
Community
Development
CEQA Double Butte Battery Energy
Storage System Project 6/10/2026
Professional
Services 6 125,795.00 9,770.05 135,565.05 5/8/2023 -
6/30/2026 No Change
Expands the scope of services to include the
additional work necessary to complete the project's
final billing.
LSA Associates, Inc 2023-0201 24100051
Community
Development CEQA Freedom Business Park Project 6/10/2026 Professional
Services 3 172,737.50 - 172,737.50 1/2/2023 -
6/30/2026 1/2/2023-12/31/2026 To allow additional time for the work to be conducted Lake Menifee Women’s Club 20260239 N/A
Community
Services
Lake Menifee Women’s Club for the
Independence Celebration 6/11/2026 MOU 1 - - 3/5/2025 -
1/1/2028 3/5/2025-1/1/2028
To revise the insurance requirements outlined in the
original agreement.
SCS Engineers 2024-0096 Various PO's
Public Works &
Engineering
Master Agreement for Environmental
Review Services 6/11/2026
Professional
Services 1 70,000.00 - 70,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Helix Environmental Planning, Inc 2024-0061 26100213
Community
Development CEQA Master Agreement 6/11/2026
Professional
Services 2 - - - 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027 To allow additional time for the work to be conducted Dudek 2024-0071 25100479
Community
Development CEQA Master Agreement 6/12/2026
Professional
Services
2 - - - 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027 To allow additional time for the work to be conducted Engineering Resouces of SoCal 2022-0264 24100283
Public Works &
Engineering
CIP 20-13 Paloma Wash Pedestrian
Bridge Project 6/16/2026
Professional
Services 6 313,200.00 - 313,200.00 6/1/2022 -
6/30/2026 6/1/2022-10/28/2026 To allow additional time for the work to be conducted Dennis Janda, Inc 2024-0015 Various PO's
Public Works &
Engineering
Master Agreement for Land Surveying &
Mapping Review 6/16/2026
Professional
Services 4 625,000.00 100,000.00 725,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Contract Amendments and Change Orders Quarterly Report - FY2025/26 Q4
Vendor Name Contract # PO # Department Contract Name Execution Date Amendment Type
Amend /
Change
Order
Number
Contract Amount
Before Amendment /
Change Order
Amendment /
Change Order
Revised
Amount
Term of
Agreement Revised Term Description of Change
Contract Amendments and Change Orders Quarterly Report - FY2025/26 Q4 NV5, Inc 2024-0111 Various PO's
Public Works &
Engineering
Master Agreement for Environmental
Review,Civil Engineering, Landscape
Design and Inspection, and Hydrolgical
and Hydraulics Engineering Services 6/16/2026
Professional
Services 3 530,000.00 150,000.00 680,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Harris & Associates, Inc 2024-0165 Various PO's
Public Works &
Engineering
Master Agreement for Civil Engineering
and Plan Check Services 6/16/2026
Professional
Services 3 325,000.00 - 325,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Dennis Janda, Inc 2024-0104 Various PO's
Public Works &
Engineering
Master Agreement for Surveying &
Mapping Services 6/16/2026
Professional
Services 1 300,000.00 - 300,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
CG Resource Management and
Engineering, Inc 2024-0097 Various PO's
Public Works &
Engineering
Master Agreement for Hydrological
Review and Inspection Services 6/16/2026
Professional
Services 1 150,000.00 - 150,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Co Brothers, LLC 20260048 26100119
Public Works &
Engineering
CIP 24-05 Fire Station 76 Living Room
Improvement Project 6/16/2026
Contract
Services 1 434,625.00 26,722.00 461,347.00 9/29/2025 -
5/5/2026 No Change
The added scope includes outdoor safety lighting
necessary to meet building and safety requirements;
installation of new light switches that were not
included in the original bid plans; additional patio
lighting was added to the original scope of work, low
voltage wiring and conduit was extended to the new
exterior wall; and installation of a motion sensor in the patio area to enhance lighting
Parsons Transporation Group 2024-0055 Various PO's
Public Works &
Engineering
Master Agreement for Traffic Engineering
Review 6/18/2026
Professional
Services 4 495,000.00 150,000.00 645,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Coast Surveying, Inc 2024-0128 Various PO's
Public Works &
Engineering
Master Agreement for Land Surveying &
Mapping Review 6/18/2026
Professional
Services 1 100,000.00 - 100,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
J. Smith & T. Muli 2024-0098 Various PO's
Public Works &
Engineering
Master Agreement for Hydrological
Review and Inspection Services 6/18/2026
Professional
Services 4 550,000.00 100,000.00 650,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
STC Traffic, Inc 2024-0054 Various PO's
Public Works &
Engineering
Master Agreement for Traffic Engineering
Review 6/18/2026
Professional
Services 1 400,000.00 - 400,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Parsons Transporation Group 2024-0053 Various PO's
Public Works &
Engineering
Master Agreement for Grant Writing &
Administration Services 6/18/2026
Professional
Services 1 450,000.00 - 450,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Gary F. Hoyt Landscape Architecture,
Inc 2024-0033 Various PO's
Public Works &
Engineering
Master Agreement for Landscape Design
& Inspection 6/18/2026
Professional
Services 3 455,000.00 50,000.00 505,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Arroyo Background investigations 20260081 26100261 Police Department Investigation Services 6/19/2026 Professional
Services
1 49,500.00 - 49,500.00 7/1/2025 -
6/30/2026
7/1/2025-8/30/2026
Extend Agreement 60 days to allow additional time for
services to be provided
Garron Wyatt 20250193 25001495 Human Resource
Human Resource Department
Investigation Services 6/19/2026
Professional
Services 2 75,000.00 - 75,000.00 2/20/2025 -
6/30/2026 2/20/2025-10/28/2026
Extend Agreement 120 days to allow additional time
for services to be provided
Dudek 20260047 26100235
Public Works &
Engineering
Master Agreement for Construction
Inspection Services 6/23/2026
Professional
Services 1 50,000.00 25,000.00 75,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Bogh Engineering, LLC 20250204 25100671
Public Works &
Engineering
CIP 20-13 Paloma Wash Pedestrian
Bridge Project
6/29/2026
Contract
Services
3 2,764,084.36 24,851.48 2,788,935.84 6/17/2025 -
12/9/2025 No Change
To include the cost of electrical changes not indicated in the Project Documents
Earth Systems Pacific 2024-0103 Various PO's
Public Works &
Engineering
Master Agreement for Material Testing
and Geotechnical Services 6/29/2026
Professional
Services 1 450,000.00 - 450,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Engineering Resouces of SoCal 2024-0110 Various PO's
Public Works &
Engineering
Master Agreement for CIP Civil Design
Services 6/29/2026
Professional
Services 1 450,000.00 - 450,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Cumming Management Group, Inc 2024-0038 Various PO's
Public Works &
Engineering
Master Agreement for Labor Compliance
Services 6/29/2026
Professional
Services 1 450,000.00 - 450,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Dokken Engineering 2024-0108 Various PO's
Public Works &
Engineering
Master Agreement for Design, Grant
Writing, and Admin Services 6/29/2026
Professional
Services 1 450,000.00 - 450,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Vendor Name Contract # PO # Department Contract Name Execution Date Amendment Type
Amend /
Change
Order
Number
Contract Amount
Before Amendment /
Change Order
Amendment /
Change Order
Revised
Amount
Term of
Agreement Revised Term Description of Change
Contract Amendments and Change Orders Quarterly Report - FY2025/26 Q4 Albert A. Webb & Associates 2024-0127 Various PO's
Public Works &
Engineering
Master Agreement for Landscape Design
and Inspection Services 6/29/2026
Professional
Services 1 150,000.00 - 150,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Aztec/TYPSA 2024-0151 Various PO's
Public Works &
Engineering
Master Agreement for Subsurface
Investigation Services 6/29/2026
Professional
Services 1 300,000.00 - 300,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
D.R. Bechter Consulting, Inc 2024-0014 Various PO's
Public Works &
Engineering
Master Agreement for Construction
Inspection Services 6/29/2026
Professional
Services 3 390,000.00 150,000.00 540,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Advantec Consulting Engineers, Inc 2024-0100 Various PO's Public Works &
Engineering
Master Agreement for Engineering
Review Services 6/29/2026
Professional
Services 1 150,000.00 - 150,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
RTM Engineering Consultants 2024-0112 Various PO's
Public Works &
Engineering
Master Agreement for Civil Design
Services 6/29/2026
Professional
Services 2 450,000.00 - 450,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Accenture Infrastructure and Capital
Projects, LLC 2024-0150 Various PO's
Public Works &
Engineering
Master Agreement for Inspection and
Labor Compliance Services 6/29/2026
Professional
Services 2 450,000.00 - 450,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
NV5, Inc 2024-0109 Various PO's
Public Works &
Engineering
Master Agreement for Civil Design
Services 6/29/2026
Professional
Services 1 450,000.00 - 450,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
CityGreen Consulting, LLC 20260026 26100107
Community
Services SB Waste Consultant Services 6/29/2026
Professional
Services
1 64,030.00 64,030.00
7/15/2026 -
6/30/2026
7/15/2026-10/28/2026
to provide sufficient time for completion of the
consulting services under the contract
Towill, Inc 2024-0107 Various PO's
Public Works &
Engineering
Master Agreement for Surveying &
Mapping Services 6/30/2026
Professional
Services 1 300,000.00 - 300,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Pettit Engineering & Architects, Inc 2024-0145 Various PO's Public Works &
Engineering
Master Agreement for Civil Engineering
Services 6/30/2026
Professional
Services 1 300,000.00 - 300,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Kimley Horn & Associates, Inc 2024-0135 Various PO's
Public Works &
Engineering
Master Agreement for Civil Design
Services 6/30/2026
Professional
Services 1 450,000.00 - 450,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs
Albert A. Webb & Associates 2024-0125 Various PO's
Public Works &
Engineering
Master Agreement for Inspection &
Comprehensive Labor Compliance
Services 6/30/2026
Professional
Services 1 450,000.00 - 450,000.00 7/1/2023 -
6/30/2026 7/1/2023-6/30/2027
To assess additional on-call service needs to include
in future RFQ and align work planning for future on-
call professional service budget needs