AMENDMENT MODIFICATION SUMMARY - (E-76)

FEDERAL AID PROGRAM CALIFORNIA DEPARTMENT OF TRANSPORTATION DLA LOCATOR: 08-RIV-O-MENI
PREFIX: ATECTIONS THROUGHOUT CITY.

PROJECT: 5483(014) TYPE OF WORK:

SEQ NO: INSTALLATION OF RETRO-REFLECTIVE BACKPLATES AND LEADING PREV AUTH / AGREE DATES:

STATE PROJ NO: 0824000055L-1 FED RR NO'S: PE:

ALT. PROJ NO: PUC CODES: R/W:

AGENCY: CITY OF MENIFEE PROJ OVERSIGHT: ASSUMED/LOCAL ADMIN CON:

ROUTE: ENV STATUS / EIS 01/29/2025 SPR:

DISASTER NO: RW STATUS / DT: 1 10/31/2025 MCS:

TIP DATA INV RTE: OTH:

MPO: SCAG BEG MP:

FSTIP YR: 23/24 END MP: PROJECT END DATE (PED): 03/31/2028 STIP REF: 20970001331 BRIDGE NO:

FSTIP ID SCAG015

PROG CODE LINE NO IMPV TYPE FUNG SYS URBAN AREA URB/RURAL DEMO ID YS70 10 15
YSTO 30

FUNDING SUMMARY

PHASE PROJECT COST FEDERAL COST AC COST
PE PREV. OBLIGATION $180,000.00 S162,000.00 50.0
PE PE THIS $0.00 $0.00 $0.00
PE SUBTOTAL $180,000.00 $162,000.00 $0.00
RW PREV. OBLIGATION $0.00 $0.00 $0.00
RW THIS REQUEST $0.00 $0.00 $0.00
RW SUBTOTAL $0.00 $0.00 $0.00
CON PREV. OBLIGATION $0.00 $0.00 $0.00
CON CON THIS REQUEST $2,573,700.00 $1,393,704.00 $0.00
CON SUBTOTAL $2,573,700.00 $1,393,704.00 $0.00
OTH PREV. OBLIGATION $0.00 $0.00 $0.00
OTH OTH THIS REQUEST $0.00 $0.00 $0.00
OTH SUBTOTAL $0.00 $0.00 $0.00
TOTAL: $2,753,700.00 $1,555,704.00 $0.00

STATE REMARKS
10/03/2023 SEQ #1 Authorize Federal Funds of $162,000 of YS30 appropriation funds for Preliminary Engineering.

SEQ#1: Initial authorization of the PE phase. Obligate $162,000 of YS70 for PE. Maximum Reimbursement Rate 90%. HSIP ID: H11-08-016. EPSP approved to move $162,000.00 from FFY 2024/25 to FFY see is aust to extend the project end date (PED) from 9/30125 to 11/30/26. The project was delayed by coordination efforts with adjacent agencies. There are no other actions requested. 01/20/2026 S11u0B-0143. Request for Authorization for Con Phase Maximum Reimbursement Rate iS 54,12%. 03/18/2026 SEQ#3: Initial authorization of the CON phase. Obligate $1,393,704 of YS70 for CON. Maximum Reimbursement Rate 90%. HSIP ID: H11-08-016. SCAG FTIP approved 12/20/2024 Amendment No. 1.

FEDERAL REMARKS

AUTHORIZATION
AUTHORIZATION TO PROCEED WITH REQUEST: CON PREPARED IN FADS BY: LABIB, JOSEPH ON 2026-03-17 963-9461 FOR: CON AUTH REVIEWED IN FADS BY: YAMBAO, RAIMUND ON 2026-03-18 654-3436 DOCUMENT TYPE: AMOD SUBMITTED IN FADS BY: YAMBAO, RAIMUND ON 2026-03-18 FOR CALTRANS PROCESSED IN FADS BY: SIGNATURE, NOT_REQUIRED ON 2026-03-18 FOR FHWA E-76 AUTHORIZED DATE IN MIS JENNIFER NASCA ON 2026-03-27 17:14:02.0 SIGNATURE HISTORY FOR PROJECT NUMBER 5483(014) AS OF 04/01/2026

HWA MIS SIGNATURE HISTORY
MOD # SIGNED BY SIGNED ON
= WAII HAYS 03/25/2026
WAIl HAYS 03/25/2026
JENNIFER NASCA 03/27/2026
1 WAIl HAYS 08/28/2025
WAII HAYS 08/28/2025
JENNIFER NASCA 09/02/2025
JERILYNN FOGLE 11/01/2023
JERILYNN FOGLE 11/01/2023
ROBBIE SCOTT 11/06/2023
FHWA FMIS 3.0 SIGNATURE HISTORY

CALTRANS SIGNATURE HISTORY

DOCUMENT TYPE SIGNED BY SIGNED ON
AMEND/MOD YAMBAO, RAIMUND 03/18/2026