Cities Index.
Agenda

Menlo Park City Council
April 4, 2023

Document
Agenda
Meeting
April 4, 2023
Body
Menlo Park City Council
Pages
4
Original file
29.8 MB
Text extracted from the city's file for reading and search. Open the original on www.menlopark.gov. That file is the official record.

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov City Council

REGULAR MEETING AGENDA
Date: 4/4/2023
Time: 6:00 p.m.

Locations: Zoom.us/join – ID# 814 7839 7160 and
Belle Haven Branch Library
413 Ivy Drive, Menlo Park, CA 94025
Members of the public can listen to the meeting and participate using the following methods. If you have issues viewing the meeting, please email the city clerk at [email protected].

How to participate in the meeting
• Submit a written comment online up to 1-hour before the meeting start time:
[email protected]
Please include the agenda item number you are commenting on. • Access the meeting real-time online at:

Zoom.us/join – Meeting ID 814 7839 7160
• Access the meeting real-time via telephone at:
(669) 900-6833
Meeting ID 814 7839 7160
Press *9 to raise hand to speak
• Watch meeting:
• Cable television subscriber in Menlo Park, East Palo Alto, Atherton, and Palo Alto:

Channel 26
• Belle Haven Branch Library
Note: City Council closed sessions are not broadcast online or on television and public participation is limited to the beginning of closed session.

Subject to Change: The format of this meeting may be altered or the meeting may be cancelled. You may check on the status of the meeting by visiting the city website menlopark.gov. The instructions for logging on to the webinar and/or the access code is subject to change. If you have difficulty accessing the webinar, please check the latest online edition of the posted agenda for updated information (menlopark.gov/agendas).

According to City Council policy, all meetings of the City Council are to end by midnight unless there is a super majority vote taken by 11:00 p.m. to extend the meeting and identify the items to be considered after 11:00 p.m.

Regular Session
A. Call To Order
B. Roll Call
C. Agenda Review
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov City Council Regular Meeting Agenda
April 4, 2023

Page 2 ends

D. Public Comment
Under “Public Comment,” the public may address the City Council on any subject not listed on the agenda. Each speaker may address the City Council once under public comment for a limit of three minutes. You are not required to provide your name or City of residence, but it is helpful. The City Council cannot act on items not listed on the agenda and, therefore, the City Council cannot respond to non-agenda issues brought up under public comment other than to provide general information.

E. Presentations and Proclamations
E1. Proclamation: Recognizing April 2023 as National Poetry Month (Attachment) Not a California Environmental Quality Act (CEQA) project.

E2. Proclamation: Recognizing April 22, 2023 as Earth Day (Attachment) Not a CEQA project.

F. Consent Calendar
F1. Accept the City Council meeting minutes for March 18, 2023 (Attachment) Not a CEQA project.

F2. Award a construction contract to G. Bortolotto & Company, Inc., for the 2023 Street Resurfacing project (Staff Report #23-085-CC)
This action is categorically exempt under CEQA Guidelines §15301 and §15304 exemption for existing facilities.

F3. Authorize the city manager to execute a service agreement with Caltrain to advance the Middle Avenue Caltrain crossing project (Staff Report #23-086-CC) Not a CEQA project.

G. Public Hearing
G1. Consider an appeal of the Planning Commission approval of a use permit to demolish an existing single-story, single-family residence and construct a new two-story residence with an attached garage on a substandard lot at 440 University Drive (Staff Report #23-097-CC) Determine this action is categorically exempt under CEQA Guidelines §15303’s Class 3 exemption for new construction or conversion of small structures.

H. Regular Business
H1. Provide direction on the proposed programming plan elements for the Menlo Park Community Campus (Staff Report #23-087-CC)
Not a CEQA project.

H2. Receive and file report on labor relations and receive public input on upcoming labor negotiations with Service Employees International Union Local 521 and American Federation of State, County and Municipal Employees Local 829 (Staff Report #23-070-CC) Not a CEQA project.

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov City Council Regular Meeting Agenda
April 4, 2023

Page 3 ends

I. City Council Initiated Items
I1. Direction on advisory body and commissioner stipends (Staff Report #23-088-CC) Not a CEQA project.

J. Informational Items
J1. City Council agenda topics: April 18 – May 9, 2023 (Staff Report #23-092-CC) Not a CEQA project.

J2. Update on Belle Haven traffic calming plan implementation (Staff Report #23-089-CC) Not a CEQA project.

J3. Belle Haven School redesign update – Ravenswood City School District (Staff Report #23-090-CC) Not a CEQA project.

J4. Update on Kelly Park athletic field synthetic turf and track renovation project (Staff Report #23-093-CC)
Not a CEQA project.

J5. Update on West Bay encroachment agreement for work near Bedwell Bayfront Park (Staff Report #23-094-CC)
Not a CEQA project.

K. City Manager's Report
L. City Councilmember Reports
M. Adjournment
At every regular meeting of the City Council, in addition to the public comment period where the public shall have the right to address the City Council on any matters of public interest not listed on the agenda, members of the public have the right to directly address the City Council on any item listed on the agenda at a time designated by the chair, either before or during the City Council’s consideration of the item.

At every special meeting of the City Council, members of the public have the right to directly address the City Council on any item listed on the agenda at a time designated by the chair, either before or during consideration of the item.

For appeal hearings, appellant and applicant shall each have 10 minutes for presentations.

If you challenge any of the items listed on this agenda in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or in written correspondence delivered to the City of Menlo Park at, or before, the public hearing.

Any writing that is distributed to a majority of the City Council by any person in connection with an agenda item is a public record (subject to any exemption under the Public Records Act) and is available by request by emailing the city clerk at [email protected]. Persons with disabilities, who require auxiliary aids or services in attending or participating in City Council meetings, may call the City Clerk’s Office at 650-330-6620.

Agendas are posted in accordance with Cal. Gov. Code §54954.2(a) or §54956. Members of the public can view electronic agendas and staff reports by accessing the City website at menlopark.gov/agendas and can receive email notification of agenda postings by subscribing at menlopark.gov/subscribe. Agendas and staff reports may also be obtained by contacting City Clerk at 650-330-6620. (Posted: 3/30/2023) Proclamation
RECOGNIZING APRIL 2023 AS NATIONAL POETRY MONTH
WHEREAS, the Academy of American Poets established the month of April as National Poetry Month in 1996; and
WHEREAS, National Poetry Month seeks to highlight the extraordinary legacy and ongoing achievement of American poets; introduce Americans to the pleasures and benefits of reading poetry; bring poets and poetry to the public in immediate and innovative ways; make poetry an important part of our children's education; and
WHEREAS, as National Poetry Month, under the leadership and direction of the Academy of American Poets, is now the largest literary celebration in the world; and WHEREAS, poetry enhances and enriches the lives of all Americans; and WHEREAS, poetry, as an essential part of the arts and humanities, affects every aspect of life in America today, including education, the economy, and community pride and development; and
WHEREAS, poetry has produced some of the nation's leading creative artists and has inspired other artists in fields such as music, theatre, film, dance, and the visual arts; and NOW, THEREFORE, BE IT PROCLAIMED, that I, Jen Wolosin,
Mayor of the City of Menlo Park, on behalf of the City Council and City, do hereby proclaim April 2023 as National Poetry Month. I call upon public officials, educators, librarians, and all the people of Menlo Park to observe this month, to celebrate the cultural riches our community has to offer, and to recognize the important role poetry in creating and sustaining this great nation with appropriate ceremonies, activities, and programs.

Jen Wolosin, Mayor
April 4, 2023
AGENDA ITEM E-1 Page E-1.1
RECOGNIZING APRIL 22, 2023 AS EARTH DAY
WHEREAS, Earth Day has been celebrated globally since 1970 to unite around protecting our common environment to ensure future generations will have a safe and sustainable future; and WHEREAS, all people of this Earth, no matter their country, gender, income, race, sexual orientation, gender identity, or abilities, have a right to live in a healthy environment; and WHEREAS, in 2019, the Menlo Park City Council adopted a resolution recognizing the threat of climate change and the urgent need to combat it; and
WHEREAS, in 2020, the Menlo Park City Council adopted its climate action plan with the goal of net zero carbon emissions by 2030; and
WHEREAS, the 2022 United Nations Intergovernmental Panel on Climate Change reported that nations are far off track from meeting commitments to reduce catastrophic climate change; and WHEREAS, Menlo Park’s location on the shore of the San Francisco Bay places residents and approximately $1.3 billion of property in our Belle Haven neighborhood at risk of flooding from climate change by as early as 2070; and
WHEREAS, the City of Menlo Park is a co-sponsor of the upcoming “Love Our Earth Festival,” to be held on Earth Day, April 22 at Menlo-Atherton High School; and
WHEREAS, the Menlo Park City Council declared a “state of emergency” with respect to climate change, yet is not on track to meet its “Zero Carbon by 2030” goal in its Climate Action Plan; and WHEREAS, local cities, including Menlo Park, helped create Peninsula Clean Energy, which supplies 100% carbon-free electricity for all customers in Menlo Park; and WHEREAS, Menlo Park has notable accomplishments in making progress in protecting the environment, such as:
 adopting all-electric Reach Codes for new construction;  implementing a sustainable green fleet policy;
 purchasing a solar-battery microgrid that will provide clean emergency power for the new community center in Belle Haven; and
WHEREAS, Menlo Park’s successful experience and presence in Silicon Valley gives it a unique opportunity to demonstrate leadership and set an example for other cities to reduce greenhouse gases with innovative, comprehensive, and expeditious approaches; and
NOW, THEREFORE, BE IT RESOLVED, that I, Jen Wolosin, Mayor of the City of Menlo Park, on behalf of the City Council and City, encourage all residents and businesses to celebrate the Earth and deepen their understanding of environmental protection, the urgency of climate change, and the need to create a healthier, safer, more equitable future for all people.

Jen Wolosin, Mayor
April 4, 2022
Proclamation
AGENDA ITEM E-2 Page E-2.1
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov City Council

SPECIAL MEETING MINUTES- DRAFT
Date: 3/18/2023
Time: 10:00 a.m.

Locations: Teleconference and
City Council Chambers
751 Laurel St., Menlo Park, CA 94025
Special Session
A. Call To Order
Mayor Wolosin called the meeting to order at 10:07 a.m.

B. Roll Call

Present: Combs, Doerr, Nash, Taylor, Wolosin

Absent: None
Staff: City Manager Justin I. C. Murphy, Assistant City Manager Stephen Stolte, City Attorney Nira F. Doherty, Assistant to the City Manager/City Clerk Judi A. Herren C. Regular Business
C1. Annual City Council priority and goal setting workshop (Staff Report #23-069-CC)  Lynne Bramlett spoke in support of prioritizing disaster preparedness, discussing the structure of the government, and utilizing residents.
 Karen Grove spoke in support of prioritizing housing and housing protections.  Patti Fry spoke in support of prioritizing more guardrails and guidance for rapid development and additional attention on financial and physical infrastructure that supports a higher quality of life.  Edward Schlesinger spoke in support of prioritizing smoke free multi-unit housing.  Linh Dan Do spoke in support of prioritizing REACH code updates to include electrification.  John McKenna spoke in support of prioritizing all climate action plan (CAP) goals and electrification.
 Gregory Faris spoke in support of prioritizing the annexation of the West Menlo triangle.  Tricia Barr spoke in support of prioritizing smoke free multi-unit housing.  Adina Levin spoke in support of prioritizing the implementation of the housing element and environmental justice element.
 Katherine Dumont spoke in support of prioritizing diverse equitable representation across the Districts on City advisory bodies and a stipend for Planning and Housing Commissioners.  Jenny Michele spoke in support of prioritizing stabilized labor and housing for all income levels.  Angela Evans spoke in support of prioritizing a new ordinance requiring electric pump water heaters and HVAC (heating, ventilation and air conditioning) systems.  Leah Elkins spoke in support of prioritizing a safe storage of firearms ordinance.  Ryan Essenburg spoke in support of prioritizing Nealon Park playground and tennis courts.  Erika D. spoke in support of prioritizing smoke free multi-unit housing.  Alheli spoke in support of prioritizing smoke free multi-unit housing.

AGENDA ITEM F-1 Page F-1.1

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov City Council Special Meeting Minutes
March 18, 2023

Page 2 ends

 Thomas Prussing spoke in support of prioritizing disaster preparedness and staffing.  Marcy Abramowitz spoke in support of prioritizing quite zones.  Steve Walter spoke in support of prioritizing quiet zones.  Fran Dehn spoke in support of prioritizing economic development considerations in all City Council decisions.
 Sally Cole spoke in support of prioritizing safe streets.

City Manager Justin Murphy introduced the item.

Facilitator Steve Mermell guided the City Council through the presentation and opened City Council discussion on each section (Attachment).

The City Council discussed the ILG article on “Attributes of Exceptional Councils”:
 Teamwork
 Good foundation for this meeting
The City Council discussed “Typical Council Norms”:
 Struggle with manual and policies conflicts
 Excited about the norms
 Good governance into practice guidance
 Communications between staff, public, and City Council  Norm enforcers
 Adding norms to mission/vision statement or creating a separate policy

The City Council discussed City Council comments
 How to manage priorities when natural disaster, pandemics, etc. occur The City Council discussed accomplishments
 Reestablishing programs and public engagement coming out of the pandemic The City Council discussed the financial outlook
 Sales tax decrease due to retired and transitioning businesses out of Menlo Park  Budgeting role in priorities and work plan
 Considering programs and projects with and without cost recovery The City Council discussed key challenges
 Viewing some challenges as opportunities
 Bifurcating forging a vision for the City and setting priorities  Clarifying the what City Council has “control” compared to what City Council has a “role”  Focusing on what impacts Menlo Park and macro level impacts  Add “meeting fatigue” to the challenge list
 Creating “enabling conditions” through ordinances
 Embracing different ways to view an issue
 City Council and staff’s role in policy initiatives, goals, and objectives

The City Council took a recess at 11:52 a.m.

Page F-1.2
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov City Council Special Meeting Minutes
March 18, 2023

Page 3 ends

The City Council reconvened at 11:58 a.m.

The City Council discussed
 The status of items not identified as a “priority”
 Priorities setting the tone for the City
 Menlopark.gov/priorities – communication page that is continually updated The City Council took a recess at 12:08 p.m.

The City Council reconvened at 12:40 p.m.

The City Council discussed community input on priorities  Ways to direct staff to work on items not listed as a “priority”  Communicating to the public about item statuses
The City Council discussed priority issues
 EMERGENCY PREPAREDNESS
 Leveraging the San Mateo County Office of Emergency Preparedness  Best practices
 Including volunteer groups already in existence
 Scale of resident impacts from local emergencies
 Incorporating in the local hazard mitigation plan
 Number of disasters in Menlo Park
 The City Council added ECONOMIC DEVELOPMENT to ACTIVATING DOWNTOWN  Investing in Downtown
 Revitalizing businesses in all Districts
 Updating Downtown aesthetics
 Need of an economic development director
 Assisting businesses city-wide with a focus on Downtown  Look at storefront vacancy rates and how to incentivize rental of vacant businesses  Revisiting the downtown specific plan zoning
 SAFE STREETS
 Need to update the transportation master plan
 ADVANCING EQUITY
 Seek additional funds through grants, etc. for additional resources city-wide  A tool to be utilized in all priorities
 ORGANIZATIONAL EFFECTIVENESS
 A tool to be utilized in all priorities
 COMMUNITY ENGAGEMENT
 A tool to be utilized in all priorities
 Improve how to communicate with residents and the dissemination of information, especially to those without internet/phone/cell service
The City Council discussed
 Items not listed as a top priority
 Agenda management
 Setting public expectations for public priority requests Page F-1.3

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov City Council Special Meeting Minutes
March 18, 2023

Page 4 ends

The City Council engaged in the selection of priorities exercise selecting the top five priorities:
 Emergency Preparedness
 Climate Action
 Activating Downtown and Economic Development
 Safe Streets
 Housing

The City Council took a recess at 2:02 p.m.

The City Council reconvened at 2:06 p.m.

City Manager Justin Murphy provided information on next steps.

The City Council provided closing statements.

D. Adjournment
Mayor Wolosin adjourned the meeting at 2:19 p.m.

Judi A. Herren, Assistant to the City Manager/ City Clerk Page F-1.4
Public Works
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov

STAFF REPORT
City Council
Meeting Date: 4/4/2023
Staff Report Number: 23-085-CC
Consent Calendar: Award a construction contract to G. Bortolotto & Company, Inc., for the 2023 Street Resurfacing
project and determine this action is categorically
exempt under California Environmental Quality Act
Guidelines Section 15301 and 15304 exemption for
existing facilities
Recommendation
Staff recommends that the City Council award a $2,263,558 construction contract, with bid alternates A through D, to G. Bortolotto & Company, Inc. (Attachment A), approve a contingency in the amount of $230,000 (held by the city), approve construction administration fees in the amount of $350,000, and determine that this action is categorically exempt under California Environmental Quality Act (CEQA) Guidelines Section 15301 and 15304 for the 2023 street resurfacing project.

Policy Issues
This project is consistent with the City’s goal of maintaining its municipal infrastructure and extending the life and safety of its roadway network. The project is also included in the fiscal year 2022-23 capital improvement program (CIP).

Background
The City is responsible for maintaining approximately 96 miles of streets and asphalt resurfacing is typically performed every two years to keep roadways at an appropriate level of service. To assist this effort, Menlo Park uses StreetSaver, a pavement management software that is approved by the Metropolitan Transportation Commission (MTC.) MTC assigns grants for roadway projects through its Pavement Management Technical Assistance Program (P-TAP), which the City applies for every two or three years.

For each application cycle, the P-TAP issues a report that assigns a pavement condition index (PCI) for City streets, and a five-year budget for project funding. The PCI evaluates existing pavement conditions on a scale from 0 (failed) to 100 (excellent) per Table 1.

Table 1: PCI classification
PCI rating Street condition
0 to 25 Failed to very poor
25 to 50 Poor
50 to 70 At risk to fair
70 to 100 Good to excellent
AGENDA ITEM F-2
Page F-2.1
Staff Report #: 23-085-CC

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov The goal of the P-TAP and the street resurfacing program is to maintain the City’s PCI, and keep its streets at an appropriate level of service, through surface treatments. The City’s overall PCI is currently 76 which is classified as “Good to Excellent.” In general, streets with higher PCIs are more cost effective to preserve and may be candidates for lower cost surface treatment options (e.g., asphalt overlays or slurry seals).

Alternatively, streets with lower PCIs may require more intensive repairs such as full street section reconstruction.

On-call pavement contract
While the street resurfacing program is an effective tool for managing the City’s overall roadway network, pavement damage is also reported throughout the year by public users and staff. These reports are often isolated areas of failure which are not captured in the street resurfacing program and need more immediate attention to prevent further deterioration. To address these areas, some repairs can be patched or repaired in-house by maintenance staff. For larger, more extensive repairs, staff also manages a separate on-call pavement repair contract. Examples of scheduled on-call work this fiscal year include asphalt base repairs and speed hump reconstruction along Bay Road (between Van Buren Road and Ringwood Avenue) and asphalt overlays along Marsh Road (at the Dumbarton railroad crossing.) Analysis
The 2023 street resurfacing project generally consists of asphalt milling and overlays (from two to six inches deep), replacement of striping and markings, tree root damage repairs, and installation of curb and gutter, curb ramps compliant with the Americans with Disabilities Act (ADA), and minor sidewalk repair or gap closure. Staff utilized StreetSaver to identify a draft list of potential street segments for the resurfacing project. This assessment is based on factors such as existing pavement condition, potential to optimize the City’s overall PCI, and available budget. Staff also evaluated areas of pavement failure for project consideration.

Sixteen street segments (comprised of a base bid and four bid alternates) were selected for resurfacing.

The 16 segments represent 2.2 miles of roadway (or 2.3 percent of the City’s total street network). This project will increase the City’s overall PCI from 76 to 78. Table 2 summarizes the project’s proposed resurfacing limits and a map of the proposed locations is included herein as Attachment B.

Page F-2.2
Staff Report #: 23-085-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov Table 2: Project street segments
Number Base bid location Begin End
1 Hill Avenue Terminal Avenue Hamilton Avenue
2 Windermere Avenue Pierce Road Newbridge Street
3 Central Avenue Pope Street Walnut Street
4 East O’Keefe Street Menalto Avenue City Limits
5 Windermere Avenue Bay Road Van Buren Road
6 Van Buren Road Hollyburne Avenue Menlo Oaks Drive
7 Burgess Drive Laurel Street Street End
8 Windsor Drive Santa Cruz Avenue Middle Avenue
9 Windsor Way Windsor Drive Street End
10 Johnson Street Santa Cruz Avenue Valparaiso Avenue
11 Blueridge Avenue Sharon Park Drive Monte Rosa Drive
12 Garland Drive Cotton Street Olive Street
Number Base bid location Begin End
A Chilco Street Terminal Avenue Railroad Crossing
B Hidden Oaks Drive Santa Cruz Avenue Street End
C Clayton Drive Alameda de las
Pulgas Street End
D Eastridge Avenue Sharon Road Monte Rosa Drive
Coordination with other agencies and CIP projects
Staff coordinated with external agencies during the project’s design phase. West Bay Sanitary District and California Water Service reviewed the proposed resurfacing locations and confirmed that their upcoming sewer and water main improvement projects were not in conflict.

Two additional street resurfacing projects will be delivered this calendar year, which are funded as separate CIPs given the size and complexity of traffic impacts. These stand-alone projects include work along Ravenswood Avenue (from El Camino Real to Laurel Street) and Haven Avenue (from Marsh Road to Atherton Channel). Construction along Ravenswood Avenue is anticipated from April to July of this year while work at Haven Avenue is expected to begin this summer, contingent upon bids received.

Construction bidding
On February 8, 2023, the City solicited bids from prospective contractors for the project. The project was advertised on Planet Bids, a procurement platform utilized by the City, and posted twice in a local newspaper. Construction bids were opened March 1, 2023, with results listed in Table 3.

Of the six bids received, G, Bortolotto & Company Inc. was identified as the apparent low bidder with a combined base bid and bid alternate price of $2,263,558, which was 44 percent lower than the engineer’s estimate of $4,010,000. Upon review, staff confirmed that the engineer’s estimate utilized a higher unit price Page F-2.3
Staff Report #: 23-085-CC

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov for asphalt, based on recently completed projects, and given the current economic climate, the engineer’s estimate was adjusted for anticipated inflation. Moving forward, staff will analyze the bids received for this project and will use the analysis to guide the creation of future cost estimates involving similar scopes of work.

Table 3: Bid results
Bidder Base bid
subtotal
Bid alternate

A, B, C, D
subtotal
Bid total
Engineer’s estimate $3,450,000 $560,000 $4,010,000
G. Bortolotto & Company, Inc. $1,936,488 $327,070 $2,263,558 Granite Rock Company $2,216,228 $315,540 $2,531,768
Radius Earthwork Inc. $2,144,500 $401,700 $2,546,200
O'Grady Paving, Inc. $2,467,500 $343,740 $2,811,240
Ghilotti Bros., Inc. $2,906,968 $395,880 $3,302,848
Catos Paving $2,969,100 $515,020 $3,484,120
City staff has found the low bidder to be experienced with projects involving similar scopes of work for asphalt and concrete improvements. Staff also determined the low bidder to be both responsive and responsible per public contracting code requirements. Subject to the City Council’s award of contract, the project is tentatively scheduled from May 2023 to September 2023.

Impact on City Resources
The project is included in the fiscal year 2022-23 CIP with $5,200,000 in available funding from the construction impact fee and highway user (gas) tax funds. The estimated budget, including the base bid and all bid alternates, is summarized in Table 4 and totals $2,843,558, including a 10 percent construction contingency and construction administration fees. Construction administration is estimated at $350,000 and includes construction management and consultant support for inspections.

Table 4: Construction budget
Item Cost
Construction subtotal (combined
base bid and bid alternates) $2,263,558
Contingency (10%) $230,000
Construction administration $350,000
Total budget $2,843,558
Available funding $5,200,000
The project has sufficient funding to construct all 16 of the project’s proposed resurfacing locations.

Therefore, staff is recommending that the City Council award a $2,263,558 construction contract, with bid alternates A through D, to G. Bortolotto & Company, Inc., approve a contingency in the amount of $230,000, Page F-2.4
Staff Report #: 23-085-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov and approve construction administration fees in the amount of $350,000 for the 2023 street resurfacing project.

Environmental Review
The project is categorically exempt under §15301 – Class 1 and §15304 – Class 4 of the CEQA Guidelines.

Both sections allow for minor alternations of existing facilities, including existing highways and streets, sidewalks, gutters, bicycle and pedestrian access, and similar facilities, as long as there is negligible or no expansion of use.

Public Notice
Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 hours prior to the meeting. Sewer lateral notices were delivered to residents in early January 2023.

Attachments
A. Construction contract
B. 2023 Street resurfacing project location map
Report prepared by:

Mike Owyang, Associate Engineer
Michael Fu, Senior Civil Engineer
Report reviewed by:

Tanisha Werner, Assistant Director of Public Works - Engineering Page F-2.5

CONSTRUCTION AGREEMENT
City Manager’s Office
701 Laurel St., Menlo Park, CA 94025
tel 650-330-6620
Agreement #:

AGREEMENT FOR SERVICES BETWEEN

THE CITY OF MENLO PARK AND FIRST PARTY
THIS CONSTRUCTION CONTRACT (“Contract”) is made and entered into this ____ day of __________, ______ (“Execution Date”) by and between the CITY OF MENLO PARK, a California municipal corporation, (“City”) and G. Bortolotto & Company, Inc. (“Contractor”).

RECITALS
A. Contractor is a California Corporation duly organized and in good standing in the State of California, License Number 397341. Contractor represents and warrants that it has the background and experience set forth in the Contractor’s responses to the notice inviting bids.

B. Contractor represents that it is duly licensed by the State of California and has the background, knowledge, experience and expertise to perform the obligations set forth in this Contract.

C. On February 8, 2023, the City issued a Notice to Contractors inviting bids for the Project. A copy of the Contractor’s Bid proposal and List of Subcontractors is attached herein and incorporated by this reference.

D. The City desires to retain Contractor as an independent contractor to provide the construction and other services identified in this Contract for the Project upon the terms and conditions contained herein.

AGREEMENT
NOW, THEREFORE, in consideration of performance by the parties of the promises, covenants and conditions contained herein, the parties hereby agree as follows:

1. DEFINITIONS. Capitalized terms used throughout the Contract Documents shall have the meanings set forth in this Contract and/or the Special Provisions. If there is a conflict between the definitions in this Contract and the Special Provisions, the definitions in this Contract shall prevail.

2. PROJECT. The project is the construction of 2023 Street Resurfacing Project, No. CPS014 (“Project”). The work includes all labor, materials, equipment, services, permits, licenses and taxes, and all other things necessary for Contractor to perform its obligations and complete the Project, including, without limitation, any Change Orders executed by City and Contractor in accordance with the requirements of the Contract Documents (“Work”).

3. CONTRACT DOCUMENTS.

3.1 List of Documents. The Contract Documents (sometimes collectively referred to as “Agreement” or “Bid Documents”) consist of the following documents which are on file with the Public Works Page F-2.6 ATTACHMENT A
Department and are hereby incorporated by reference.
1) Change Orders
2) Field Orders
3) Contract
4) Bidding Addenda
5) Special Provisions
6) Project Plans and Drawings
7) Technical Specifications
8) City Standard Details
9) State of California Department of Transportation Specifications, 2006 Edition (Cal Trans specifications)
10) Notice to Contractors
11) Contractor's Bid
12 Bidder Certifications, Questionnaire and Statements
13) Reports listed in the Contract Documents
14) City of Menlo Park Waste Management Form, Waste Management Daily Transport Report 15) City of Menlo Park Truck Route Map and Regulations
16) Performance, Payment and Maintenance Bonds

3.2 Order of Precedence. For the purposes of construing, interpreting and resolving inconsistencies between and among the provisions of this Contract, the Contract Documents shall have the order of precedence as set forth in the preceding section. If a claimed inconsistency cannot be resolved through the order of precedence, the City shall have the sole power to decide which document or provision shall govern as may be in the best interests of the City.

4. PERMITS. Contractor, at its sole expense, shall obtain and maintain during the term of this Contract, all appropriate permits, licenses and certificates that may be required in connection with the performance of the Work, including, but not limited to, a City business license.

5. DEPARTMENT OF INDUSTRIAL RELATIONS. Contractor and any subcontractor performing Work on this Project shall be registered with the Department of Industrial Relations (“DIR”) pursuant to Labor Code Section 1725.5. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the DIR pursuant to Labor Code Section 1725.5, with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a). This Project is subject to compliance monitoring and enforcement by the DIR. It is the responsibility of the Contractor to ensure all DIR requirements and regulations are met and stay current. For more information, see http://dir.ca.gov/Public-Works/SB854.html.

6. TERM. This Contract is effective on the Execution Date set forth in the initial paragraph of this Contract and shall remain in effect until the Project has been satisfactorily completed by Contractor, unless earlier terminated pursuant to the terms of this Contract.

7. TIME OF COMPLETION. Time is of the essence with respect to all time limits set forth in the Contract Documents. Contractor shall commence the Work on the date specified in the City’s Notice to Proceed. Contractor shall diligently prosecute the Work to Substantial Completion within the working days specified per the contract documents and the City’s Notice to Proceed (“Contract Time”). The Contract Time may only be adjusted for extensions of time approved by the City and agreed to by Change Order executed by City and Contractor in accordance with the requirements of the Contract Documents.

Page F-2.7

8. COMPENSATION. The City agrees to compensate Contractor for its satisfactory completion of the Work in compliance with the Contract Documents for the not to exceed amount of two million and two hundred and sixty-three thousand five hundred fifty-eight dollars ($2,263,558.00) (“Contract Sum”).

Payment shall be as set forth in the Plans, Special Provisions and/or Technical Specifications. The Contract Sum may only be adjusted by Change Orders issued, executed and satisfactorily performed by Contractor in accordance with the requirements of the Contract Documents. The Contract Sum shall be adjusted (upward or downward) only to account for Change Orders. The Contract Sum is and shall be full compensation for all Work performed by Contractor. The Contract Sum shall cover all losses arising out of the nature of the Work or from the elements or any unforeseen difficulties or obstructions which may arise or be encountered in performance of the Work until its Acceptance by the City, all risks connected with the Work and any and all expenses incurred due to the suspension or discontinuance of the Work.

9. STANDARD OF PERFORMANCE. As a material inducement to the City to enter into this Contract, Contractor hereby represents and warrants that it has the qualifications and experience necessary to undertake the Work to be provided and the Project to be completed pursuant to this Contract.

Contractor agrees that the Work shall be performed by qualified, experienced and well-supervised personnel. The Work performed pursuant to this Contract shall be performed in a manner consistent with the standard of care under California law applicable to those who specialize in providing such services for projects of the type, scope and complexity of the Project.

10. COMPLAINCE WITH LAW. This Project constitutes a public work within the meaning of California Labor Code Section 1720 et. seq. and is subject to prevailing wage laws. The Work performed by Contractor pursuant to this Contract shall be provided in accordance with all ordinances, resolutions, statutes, rules and regulations of the City, and any federal, state or local governmental agency having jurisdiction in effect at the time the work is rendered.

11. REPRESENTATIVE. Robert Bortolotto is hereby designated as the project manager/superintendent/foreman of Contractor authorized to act on its behalf with respect to the Work specified in this Contract. It is expressly understood that the experience, knowledge, capability and reputation of G. Bortolotto & Company, Inc. were a substantial inducement for City to enter into this Contract. Therefore, Robert Bortolotto shall be responsible during the term of this Contract for directing all activities of Contractor and devoting sufficient time to personally supervise the services hereunder.

The representative may not be changed by Contractor without the express written approval of the City.

12. LIQUIDATED DAMAGES.

12.1 Entitlement. City and Contractor acknowledge and agree that if Contractor fails to fully and satisfactorily complete the Work within the Contract Time, the City will suffer, as a result of Contractor’s failure, substantial damages which are both extremely difficult and impracticable to ascertain. Such damages may include, but are not limited to: (a) loss of public confidence in the City and its contractors; (b) loss of public use of public facilities; and (c) extended disruption to public.

12.2 Daily Amount. City and Contractor have reasonably endeavored, but failed, to ascertain the actual damage that the City will incur if the Contractor fails to achieve Substantial Completion of the Work within the Contract Time. Therefore, the parties agree that in addition to all other damages to which the City may be entitled other than delay damages, in the event the Contractor shall fail to achieve Substantial Completion of the Work within the Contract Time, Contractor shall pay City as liquidated damages the amount of Five Hundred Dollars ($500) per day for each calendar day after the expiration of the Contract Time until Contractor achieves Substantial Completion of the Work. The liquidated damages amount is not a penalty, but a reasonable estimate of the amount of damages the City will Page F-2.8
suffer.

12.3 Apportionment. Such liquidated damages shall be subject to reduction for delays for which Contractor is entitled to receive an extension of time under the Contract Documents (“Apportionment”).

Such Apportionment shall not be affected by the fact that liquidated damages may not be applied for periods of time during which delays have occurred that are caused by both City and Contractor. It is agreed that the liquidated damages shall not be applied for portions of the Work completed prior to the expiration of the Contract Time.

12.4 Exclusive Remedy. City and Contractor acknowledge and agree that this Section 11, Liquidated Damages, shall be the City’s only remedy for delay damages caused by the Contractor’s failure to achieve Substantial Completion of the Work within the Contract Time.

12.5 Damages upon Abandonment. In the event that the Contractor either abandons the Work or is terminated for default in accordance with the provisions of this Contract, City shall have the right, in its sole discretion exercised by written notice issued either before or after Substantial Completion, to elect to either assert or waive its right to liquidated damages. If City elects to assert its right to liquidated damages, then the liquidated damages shall be calculated from expiration of the Contract Time to the date that Substantial Completion of the Work is achieved by the City or its replacement contractor employed to complete Contractor’s performance. If City elects to waive its right to liquidated damages, then Contractor shall be liable to the City, in lieu of the liquidated damages, for all actual Losses (as defined in the General Conditions) proximately resulting from Contractor’s failure to complete the Work within the Contract Time.

12.6 Other Remedies. The parties further acknowledge and agree that the City is entitled to any and all available legal and equitable remedies City may have where City’s Losses are caused by any reason other than Contractor’s failure to achieve Substantial Completion of the Work within the Contract Time.

13. INDEPENDENT CONTRACTOR. Contractor is, and shall at all times remain as to the City, a wholly independent contractor and not an agent or employee of the City. Contractor shall receive no premium or enhanced pay for work normally understood as overtime, nor shall Contractor receive holiday pay, sick leave, administrative leave, or pay for any other time not actually worked. The intention of the parties is that Contractor shall not be eligible for benefits and shall receive no compensation from the City except as expressly set forth in this Contract. Contractor shall have no power to incur any debt, obligation, or liability on behalf of the City or otherwise act on behalf of the City as an agent. Neither the City, nor any of its agents shall have control over the conduct of Contractor, any of Contractor’s employees, or any subcontractors, except as set forth in this Contract. Contractor shall at no time, or in any manner, represent that it or any of its agents or employees or subcontractors are in any manner employees of the City. Contractor agrees to pay all required taxes on amounts paid to Contractor under this Contract, and to indemnify and hold the City harmless from any and all taxes, assessments, penalties, and interest asserted against the City by reason of the independent contractor relationship created by this Contract. Contractor shall fully comply with the worker’s compensation law regarding Contractor, Contractor’s employees and subconsultants. Contractor further agrees to indemnify and hold the City harmless from any failure of Contractor and any subconsultants to comply with applicable worker’s compensation laws.

14. CONFLICT OF INTEREST. Contractor covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which may be affected by the work to be performed by Consultant under this Contract, or which would conflict in any manner with the performance of its services hereunder. Contractor further covenants that, in performance of this Contract, no person having any such interest shall be employed by it. Furthermore, Contractor shall avoid the appearance of having Page F-2.9
any interest which would conflict in any manner with the performance of the work pursuant to this Contract. Contractor agrees not to accept any employment during the term of this Contract which is or may make Contractor financially interested, as provided in California Government Code Sections 1090 and 87100, in any decision made by the City on any matter in connection with which Contractor has been retained pursuant to this Contract. However, nothing herein shall preclude Contractor from accepting other engagements with the City.

15. INDEMNIFICATION.

15.1 To the fullest extent permitted by law, Contractor shall indemnify, defend, with independent counsel approved by the City, and hold harmless the City, and its elective or appointive boards, officers, employees agents and volunteers (“Indemnitee”) from and against any and all claims, losses, or liability that may arise out of or result from damages to property or personal injury received by reason of, or in the course of work performed under this Contract due to the acts or omissions of Contractor or Contractor’s officers, employees, agents or subcontractors. The indemnification provisions survive completion of the Work or the termination of this Contract. The acceptance of such services shall not operate as a waiver of such right of indemnification. Notwithstanding the foregoing, nothing contained herein shall be construed as obligating Contractor to indemnify any Indemnitee for any claims, losses or liability resulting from the sole or active negligence or willful misconduct of the Indemnitee. Contractor shall pay City for any costs incurred in enforcing this provision.

15.2 The City does not and shall not waive any rights that they may possess against Contractor because of the acceptance by the City or the deposit with the City of any insurance policy or certificate required pursuant to this Contract. This hold harmless and indemnification provision shall apply regardless of whether or not any insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense.

15.3 Pursuant to Public Contract Code Section 9201, the City shall timely notify Contractor upon receipt of any third-party claim relating to the Contract.

16. ASSIGNABILITY. The parties agree that the experience and qualifications of Contractor as set forth in the Contractor’s Bid are material considerations for the City entering into this Contract. Consultant shall not assign or transfer any interest in this Contract, without the prior written consent of the City, and any attempt by Contractor to do so shall be void and of no effect and a breach of this Contract. For purposes of this section, the sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Contractor or of any general partner or joint venturer or syndicate member of Contractor, if a partnership or joint venture or syndicate or co-tenancy exists, which shall result in changing the control of Contractor, shall be construed as an assignment of this Construction Contract.

Control means more than fifty percent (50%) of the voting power of the corporation or other entity.

17. INSURANCE AND BOND REQUIREMENTS.

17.1 Prior to the commencement of any Work, the Contractor shall provide the City with evidence that it has obtained the insurance required by this Section and all bonds, including, but not limited to, payment and performance bonds, required in the Special Provisions. Failure to obtain and maintain the required insurance and bonds to so shall be deemed a material breach of this Contract.

17.2 Insurance Requirements. Contractor shall obtain the following insurance.

A. Worker’s Compensation and Employer’s Liability Insurance: The CONTRACTOR shall have in effect during the entire life of this Contract workers' compensation and Employer's Liability Insurance providing Page F-2.10
full statutory coverage. In signing this Contract, the CONTRACTOR makes the following certification, required by Section 18161 of the California Labor Code: "I am aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of the Code, and I will comply with such provisions before commencing the performance of the work of this Contract." B. Commercial General Liability Insurance: The CONTRACTOR shall take out and maintain during the life of this Contract such Bodily Injury Liability and Property Damage Liability Insurance (Commercial General Liability Insurance) on an occurrence basis as shall protect it while performing work covered by this Contract from any and all claims for damages for bodily injury, including accidental death, as well as claims for property damage which may arise from the CONTRACTOR's operations under this Contract, whether such operations be by CONTRACTOR or by any sub-consultant or by anyone directly or indirectly employed by either of them. The amounts of such insurance shall be not less than two million dollars ($2,000,000) per occurrence and four million dollars ($4,000,000) in aggregate, or four million dollars ($4,000,000) combined single limit bodily injury and property damage for each occurrence.

CONTRACTOR shall provide the City with acceptable evidence of coverage, including a copy of all declarations of coverage exclusions.

C. Automobile Liability Insurance: CONTRACTOR shall maintain Automobile Liability Insurance pursuant to this Contract in an amount of not less than one million dollars ($1,000,000) for each accident combined single limit or not less than one million dollars ($1,000,000) for any one (1) person, and one million dollars ($1,000,000) for any one (1) accident, and Three Hundred Thousand Dollars, ($300,000) property damage.

17.3 CITY and its subsidiary agencies, and their officers, agents, employees and servants shall be named as additional insured on any such policies of Commercial General Liability and Automobile Liability Insurance, (but not for the workers' compensation), which shall also contain a provision that the insurance afforded thereby to the CITY, its subsidiary agencies, and their officers, agents, employees, and servants shall be primary insurance to the full limits of liability of the policy, and that if the CITY, its subsidiary agencies and their officers and employees have other insurance against a loss covered by a policy, such other insurance shall be excess insurance only.

17.4 In the event of the breach of any provision of this Section, or in the event any notice is received which indicates any required insurance coverage will be diminished or canceled, CITY, at its option, may, notwithstanding any other provision of this Contract to the contrary, immediately declare a material breach of this Contract and suspend all further work pursuant to this Contract.

17.5. Before the execution of this Contract, any deductibles or self-insured retentions must be declared to and approved by CITY.

18. SUSPENSION. The City may, at any time and from time to time, without cause, order Contractor, in writing (“Suspension Order”), to suspend, delay, or interrupt the Work in whole or in part for such period of time, up to an aggregate of fifty percent (50%) of the Contract Time, as City may determine, with such period of suspension to be computed from the date of the Suspension Order. Upon receipt of a Suspension Order, Contractor shall, at City’s expense, comply with its terms and take all reasonable steps to minimize costs allocable to the Work covered by the Suspension Order during the period of work stoppage. Within the period of the above noted aggregate time, or such extension to that period as is agreed upon by Contractor and City, City shall either cancel the Suspension Order or delete the work covered by the Suspension Order by issuing a Change Order. If a Suspension Order is canceled or expires, Contractor shall resume and continue with the Work. A Change Order will be issued to cover any adjustments of the Contract Sum or the Contract Time necessarily caused by such suspension.

Page F-2.11

19. BOOKS AND RECORDS. Contractor shall keep full and detailed accounts and exercise such controls as may be necessary for proper financial management under this Contract in accordance with generally accepted accounting principles and practices consistently applied. City and City's accountants shall be afforded access at all times during normal business hours, to inspect, audit and copy Contractor's records, books, estimates, take-offs, cost reports, ledgers, schedules, correspondence, instructions, drawings, receipts, subcontracts, purchase orders, vouchers, memoranda and other data relating to this Project, and Contractor shall preserve these for a period of three years after the later of (i) final payment or (ii) final resolution of all Contract Disputes and other disputes or for such longer period as may be required by law. Contractor’s compliance with any request by City pursuant to this Section18 shall be a condition precedent to filing or maintenance of any legal action or proceeding by Contractor against City and to Contractor's right to receive further payments under the Contract Documents. Any failure by Contractor to provide access to its business records for inspection or copying by City shall be specifically enforceable by issuance of a writ or a provisional or permanent mandatory injunction by a court of competent jurisdiction based on affidavits submitted to such court, without the necessity of oral testimony.

20. WAIVER. Waiver by either party of any breach or violation of any one or more terms or conditions of this Contract shall not be deemed to be a waiver of any other term or condition contained herein or a waiver of any subsequent breach or violation of the same or any other term or condition. Acceptance by the City of the performance of any work by the Contractor shall not be deemed to be a waiver of any term or condition of this Contract. In no event shall the City’s making of any payment to Contractor constitute or be construed as a waiver by the City of any breach of this Contract, or any default which may then exist on the part of Contractor, and the making of any such payment by the City shall in no way impair or prejudice any right or remedy available to the City with regard to such breach or default.

21. DEFAULT. In the event the City determines, in its sole discretion, that Contractor has failed or refused to perform any of the obligations set forth in the Contract Documents, or is in breach of any provision of the Contract Documents, the City may give written notice of default to Contractor in the manner specified for this giving of notices in this Contract. Except for emergencies, Contractor shall cure any default in performance of its obligations under the Contract Documents within two (2) business days after receipt of written notice. However, if the breach cannot be reasonably cured within such time, Contractor will commence to cure the breach within two (2) days and will diligently and continuously prosecute such cure to completion within a reasonable time, which shall in no event be later than ten (10) days after receipt of such written notice.

22. CITY RIGHTS AND REMEDIES.

22.1 Remedies Upon Default. In the event that Contractor fails to cure any default of this Contract within the time period set forth in Section 20, then City may pursue any remedies available under law or equity, including, without limitation, the following: (1) the City may, without terminating the Contract, delete certain portions of the Work, reserving to itself all rights to losses related thereto; (2) the City may, without terminating the Contract, engage others to perform the Work or portion of the Work that has not been performed by the Contractor and withhold the cost thereof to City from future payments to the Contractor, reserving to itself all rights to Losses related thereto; or (3) the City may, without terminating the Contract and reserving to itself all rights to Losses related thereto, suspend all or any portion of this Construction Contract for as long a period of time as City determines, in its sole discretion, appropriate, in which event City shall have no obligation to adjust the Contract Sum or Contract Time, and shall have no liability to Contractor for damages if City directs Contractor to resume Work; (4) the City may terminate all or any part of this Contract for default, reserving to itself all rights of Losses related thereto; or (5) the City may, without terminating the Contract and reserving to itself all rights to Losses related thereto, exercise its rights under the Performance Bond.

Page F-2.12

22.2 Additional Provisions. All of City’s rights and remedies under this Contract are cumulative, and shall be in addition to those rights and remedies available in law or in equity. Designation in the Contract Documents of certain breaches as material shall not be construed as implying that other breaches not so designated are not material nor shall such designations be construed as limiting City’s right to terminate the Contract, or the exercise of its other rights or remedies for default, to only material breaches. City’s determination of whether there has been noncompliance with the Contract so as to warrant exercise by City of its rights and remedies for default under the Contract, shall be binding on all parties. No termination or action taken by City after such termination shall prejudice any other rights or remedies of City provided by law or equity or by the Contract Documents upon such termination; and City may proceed against Contractor to recover all liquidated damages and Losses suffered by City.

22.3 Delays by Sureties. Without limitation to any of City’s other rights or remedies under the law, City has the right to suspend the performance by Contractor’s sureties in the event of any of the following:
(1) failure of the sureties to begin Work within a reasonable time in such manner as to insure full compliance with the Contract within the Contract Time; (2) abandonment of the Work; (3) if at any time City is of the opinion the Work is unnecessarily or unreasonably delayed; (4) willful violation of any terms of the Contract; (5) failure to perform according to the Contract Documents; or (6) failure to follow instructions of City for its completion within the Contract Time. City will serve notice of such failure upon the sureties and in the event the sureties neglect or refuse to cure the breach within the time specified in such notice, City shall have the power to suspend the performance or any part thereof of the sureties.

22.4 Damages to the City. The City will be entitled to recovery of all Losses under law or equity in the event of Contract’s default under the Contract Documents. In the event that City's Losses arise from Contractor’s default under the Contract Documents, City shall be entitled to withhold monies otherwise payable to Contractor until Final Completion, as defined in the General Conditions, of the Project. If City incurs Losses due to Contractor’s default, then the amount of Losses shall be deducted from the amounts withheld. Should the amount withheld exceed the amount deducted, the balance will be paid to Contractor or its designee upon Final Completion of the Project. If the Losses incurred by City exceed the amount withheld, Contractor shall be liable to City for the difference and shall promptly remit same to City.

22.5 Termination of the Contract for Default. Without limitation to any of City’s other rights or remedies at law or in equity, and reserving to itself all rights to Losses related thereto, City shall have the right to terminate this Contract, in whole or in part, upon the failure of Contractor to promptly cure any default.

City’s election to terminate the Contract for default shall be communicated by giving Contractor a written notice of termination in the manner specified for the giving of notices in the Contract. Any notice of termination given to Contractor by City shall be effective immediately, unless otherwise provided therein.

22.6 Termination Without Cause. City shall have the option, at its sole discretion and without cause, of terminating this Contract in part or in whole by giving thirty (30) days written notice to Contractor.

Contractor agrees to accept such sums as allowed under this Section as its sole and exclusive compensation and waives any claim for other compensation or Losses, including, but not limited to, loss of anticipated profits, loss of revenue, lost opportunity, or other consequential, direct, indirect or incidental damages of any kind.

22.7 Compensation. Following termination without cause and within forty-five (45) days after receipt of a billing from Contractor seeking payment of sums authorized by this Section, City shall pay to Contractor as its sole compensation for performance of the Work the following: (1) the amount of the Contract Sum allocable to the portion of the Work properly performed by Contractor as of the date of termination, less sums previously paid to Contractor; (2) reasonable costs of Contractor and its Page F-2.13
Subcontractors and Sub-subcontractors for demobilizing and administering the close-out of its participation in the Project (including, without limitation, all billing and accounting functions, not including attorney or expert fees) for a period of no longer than thirty (30) days after receipt of the notice of termination in an amount not to exceed the daily sum payable to Contractor for Compensable Delays; (3) previously unpaid cost of any items delivered to the Project Site which were fabricated for subsequent incorporation in the Work.

22.8 Subcontractors. Contractor shall include provisions in all of its subcontracts, purchase orders and other contracts permitting termination for convenience by Contractor on terms that are consistent with this Contract and that afford no greater rights of recovery against Contractor than are afforded to Contractor under this Section.

22.9 Contractor’s Duties Upon Termination. Upon receipt of a notice of termination for default or for convenience, Contractor shall, unless the notice directs otherwise, do the following: (1) immediately discontinue the Work to the extent specified in the notice; (2) place no further orders or subcontracts for materials, equipment, services or facilities, except as may be necessary for completion of such portion of the Work as is not discontinued; (3) provide to City a description, in writing no later than fifteen (15) days after receipt of the notice of termination, of all subcontracts, purchase orders and contracts that are outstanding, including, without limitation, the terms of the original price, any changes, payments, balance owing, the status of the portion of the Work covered and a copy of the subcontract, purchase order or contract and any written changes, amendments or modifications thereto, together with such other information as City may determine necessary in order to decide whether to accept assignment of or request Contractor to terminate the subcontract, purchase order or contract; (4) promptly assign to City those subcontracts, purchase orders or contracts, or portions thereof, that City elects to accept by assignment and cancel, on the most favorable terms reasonably possible, all subcontracts, purchase orders or contracts, or portions thereof, that City does not elect to accept by assignment; and (5) hereafter do only such Work as may be necessary to preserve and protect Work already in progress and to protect materials, plants, and equipment on the Project Site or in transit thereto.

23. CONTRACTOR’S RIGHTS AND REMEDIES. Contractor may terminate this Construction Contract for cause only upon the occurrence of one of the following: (1) the Work is stopped for sixty (60) consecutive days, through no act or fault of Contractor, any subcontractor or any employee or agent of Contractor or any subcontractor, due to issuance of an order of a court or other public authority other than City having jurisdiction or due to an act of government, such as a declaration of a national emergency making material unavailable; or (2) if the City does not make payment of sums that are not in good faith disputed by the City and does not cure such default within ninety (90) days after receipt of notice from Contractor, then upon an additional thirty (30) days’ notice to City, Contractor may terminate the Contract.

23.1 Damages to Contractor. In the event of termination for cause by Contractor, City shall pay Contractor the sums provided for in Section 21 above. Contractor agrees to accept such sums as its sole and exclusive compensation and agrees to waive any claim for other compensation or Losses, including, but not limited to, loss of anticipated profits, loss of revenue, lost opportunity, or other consequential, direct, indirect and incidental damages, of any kind.

24. NOTICES. Any notices or other communications required or permitted to be given under this Contract shall be given in writing by personal delivery, by a recognized courier service, or by U.S. mail, postage prepaid, and return receipt requested, addressed to the respective parties as follows:

Page F-2.14
To City: To Contractor:

Assistant Public Works Director - Engineering G. Bortolotto & Company, Inc.

City of Menlo Park 582 Bragato Road
City Hall, 701 Laurel St. San Carlos, CA 94070-6227
Menlo Park, CA 94025

25. Notice shall be deemed communicated on the earlier of actual receipt or 48 hours after deposit in the U.S. mail, or the date of delivery shown on deliverer’s receipt. In the event of any change of address, the moving party is obligated to notify the other party of the change of address in writing within a reasonable period of time.

In addition, copies of all Claims by Contractor under this contract shall be provided to the City Attorney as follows:

To City Attorney:

City Attorney
Burke, Williams & Sorensen, LLP
181 Third Street, Suite 200
San Rafael, CA 94901
All claims shall be delivered personally or sent by certified mail.

26. NON-DISCRIMINATION AND EQUAL EMPLOYMENT OPPORTUNITY. In the performance of this Contract, Contractor shall not discriminate against any employee, subcontractor or applicant for employment because of race, color, creed, religion, sex, marital status, sexual orientation, national origin, ancestry, age, physical or mental handicap, or medical condition. Contractor will take affirmative action to ensure that employees are treated without regard to race, color, creed, religion, sex, marital status, sexual orientation, national origin, ancestry, age, physical or mental handicap, or medical condition.

27. CONTRACT DOCUMENTS AND PRECEDENCE. The Contract Documents shall consist of the following documents. In case of inconsistencies between Contract Documents, the documents are listed in order of precedence.

28. PUBLIC WORKS CLAIMS. This Contract is subject to Public Contracts Code Section 9204 governing contractor claims.

29. ATTORNEYS’ FEES; VENUE. In the event that any party to this Contract commences any legal action or proceeding to enforce or interpret the provisions of this Contract, the prevailing party in such action or proceeding shall be entitled to recover reasonable attorneys’ fees and other costs incurred in that action or proceeding, in addition to any other relief to which the successful party may be entitled.

The venue for any litigation shall be San Mateo County.

30. COOPERATION. In the event any claim or action is brought against the City relating to Contractor’s performance or services under this Agreement, Contractor shall render any reasonable assistance and cooperation which City might require.

31. NUISANCE. Contractor shall not maintain, commit, nor permit the maintenance or commission of any nuisance in connection with the performance of services under this Contract.

Page F-2.15

32. GOVERNING LAW. This Contract shall be construed in accordance with and governed by the laws of the State of California.

33. COMPLETE AGREEMENT; SEVERABILITY. This Contract, and any other documents incorporated herein by reference, represent the entire and integrated agreement between the City and Contractor.

This Contract supersedes all prior oral and written negotiations, representations or agreements. No prior oral or written understanding shall be of any force or effect with respect to those matters covered hereunder. This Contract may only be modified by a written amendment duly executed by the parties to this Contract. In case a provision of this Contract is held to be invalid, illegal or unenforceable, the validity, legality and enforceability of the remaining provisions shall not be affected.

34. COUNTERPARTS. This Contract may be signed in multiple counterparts, which shall, when executed by all the parties constitute a single binding contract.

SIGNATURES ON NEXT PAGE.

Page F-2.16
IN WITNESS WHEREOF, the parties hereto have executed this agreement on the day and year first above written.

FOR FIRST PARTY:

Signature Date
Printed name Title
Tax ID#
APPROVED AS TO FORM:

Nira F. Doherty, City Attorney Date
FOR CITY OF MENLO PARK:

Justin I. C. Murphy, City Manager Date
ATTEST:

Judi A. Herren, City Clerk Date
Page F-2.17
Page F-2.18

ATTACHMENT B
Public Works
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov

STAFF REPORT
City Council
Meeting Date:

Staff Report Number:

Consent Calendar:
4/4/2023
23-086-CC
Authorize the city manager to execute a service
agreement with Caltrain to advance the Middle
Avenue Caltrain crossing project
Recommendation
Staff requests that the City Council authorize the city manager to execute a service agreement with Caltrain for $571,940.60 to conduct critical project development tasks for the Middle Avenue Caltrain crossing project, including selecting the contract delivery method for construction, developing requests for proposals (RFP) for final design and potentially construction, and development of a memorandum of understanding (MOU) for the design and pre-construction services (Attachment A).

Policy Issues
The Middle Avenue Caltrain crossing project (project) is consistent with policies stated in the 2016 general plan circulation element, the El Camino Real and Downtown specific plan and is included in the City’s capital improvement program (CIP.) These policies seek to maintain a safe, efficient, attractive, user-friendly circulation system that promotes a healthy, safe and active community and quality of life throughout Menlo Park.

Background
On July 20, 2016, the San Mateo County Transportation Authority programmed funds from the Measure A Grade Pedestrian and Bicycle Program in the amount of $490,000 for the preliminary engineering and environmental clearance phases of the project. The City hired AECOM Technical Services, Inc. (AECOM) to prepare 30 percent design documents, complete required environmental analysis, and conduct community engagement. Staff also coordinated with Caltrain on design criteria and the ongoing electrification of the corridor.

On August 27, 2019, the City Council unanimously passed a motion to select Concept 3 (Attachment B) as the preferred alternative for the crossing. The project will construct an undercrossing approximately 10-12 feet below the street/plaza elevation that generally aligns with a proposed raised crosswalk on Alma Street and is slightly offset from the plaza at 500 El Camino Real (Stanford’s Middle Plaza development.) On January 28, 2020, the City Council certified the project environmental document, an addendum to the El Camino Real and Downtown specific plan environmental impact report (EIR), and approved the 30 percent project plans.

On January 11, 2022, the City Council adopted resolution 6690 authorizing the city manager to execute a purchase and sale agreement (PSA) with Menlo Station Development, LLC, for a portion of 700-800 El Camino Real (APN 071-333-200) to support implementation of the Middle Avenue pedestrian and bicycle rail crossing. The property being purchased by the City is the location of the ramps that connect the tunnel AGENDA ITEM F-3 Page F-3.1
Staff Report #: 23-086-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov to Middle Plaza. The city manager executed the agreement May 5, 2022. The City has provided the required $100,000 deposit into escrow and conducted due diligence activities specified in the PSA. The escrow period is for a maximum of two years, but could conclude earlier if final agreements are received earlier from Caltrain and the California Public Utilities Commission (CPUC).

Analysis
Staff are pursuing a number of work activities to advance the project, including:
• Adjustment of the 700-800 El Camino Real Planned Development Permit. This is required to reduce the parking provided at 700-800 El Camino Real as a result of removing the parking spaces on the property being purchased by the City. Staff currently anticipate bringing this item to the Planning Commission April 24, with final action by the City Council to follow. • Approval by the CPUC of the new crossing. This item is on track for completion before the close of escrow for the property purchase.
• Design coordination with Caltrain. Staff have been meeting regularly with Caltrain to discuss design details, construction methods, and the impact of Caltrain electrification on the project. Staff will bring an update to City Council with substantive project updates later this year.

The service agreement (Attachment A) funds three activities to advance project development, including establishing the contract delivery method, developing one or two RFPs for design and construction (in accordance with the selected contract delivery method), and developing a MOU to guide the design and pre-construction services. As a locally sponsored project, Caltrain requires the City to provide all funding for the undercrossing. However, the crossing itself will be constructed by Caltrain. This agreement will help with the transition from City-led activities (planning, environmental clearance and preliminary engineering/design) into Caltrain-led activities (final design and construction).

Selecting a contract delivery method is important for projects that deal with complex systems like an operating railroad. Traditionally, public works projects are contracted using a design-bid-build process. More recently, public agencies have advanced capital projects using alternate contract delivery methods that include: design-build (a single contractor designs and builds the project), contract manager/general contractor (design and construction contracts remain separate, but the construction manager/general contractor (CMGC) is hired early in the process to better coordinate the two phases), and others. These methods can help shift risk and/or provide greater construction cost certainty. In the first task, Caltrain and City staff will participate in a workshop to select the appropriate contract delivery method to move the project forward.

Development of a RFP for final design (or for design and CMGC) is a necessary step to move from the adopted design into full final design and construction. Depending on the selected contract delivery method, there may be one (design) or two (design and CMGC) RFPs developed through the execution of the service agreement.

Impact on City Resources
The cost of the current service agreement with Caltrain is estimated up to $571,940.60. The service agreement includes the maximum resources that Caltrain has identified are needed to complete the tasks, including contingency. There may be cost efficiencies at each phase that will be recaptured by the City to fund future phases of work.

The project has received over $20 million in City and grant funding to support the design and construction of Page F-3.2
Staff Report #: 23-086-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov the undercrossing (Table 1), including federal funding from a member designated project nominated by Representative Eshoo in December 2022 and a third cycle One Bay Area Grant (OBAG-3) in January 2023.

Table 1 – Middle Undercrossing funding plan
Funding Source Amount Phase
Measure A/W Pedestrian/Bicycle Program San Mateo County Transportation Authority $1,130,000 Design
Middle Plaza development agreement
contribution Private, Stanford University $5,000,000 Construction Transportation impact fees City of Menlo Park $5,658,334 Design and construction
Stanford recreational mitigation grant Santa Clara County $1,000,000 Construction One Bay Area Grant – Third Cycle (OBAG-3) Metropolitan Transportation Commission $5,000,000 Construction
Federal omnibus budget bill USDOT $4,000,000 Construction Total $21,788,334
Environmental Review
This action is not a project within the meaning of California Environmental Quality Act (CEQA) as it will not directly result in a change to the physical environment.

The overall construction of the Middle Avenue pedestrian and bicycle undercrossing project is within the scope of the El Camino Real and Downtown specific plan EIR, State Clearinghouse No. 2009122048 (Specific Plan EIR), certified by City Council June 5, 2012, consistent with CEQA Guidelines §15168. The City prepared an addendum to the Specific Plan EIR because changes and additions to the document were necessary, but none of the conditions described in §15162 of the CEQA Guidelines calling for the preparation of a subsequent EIR occurred. On January 28, 2020, the City Council certified an addendum to the Specific Plan EIR, which analyzed potential impacts from the implementation of the Middle Avenue pedestrian and bicycle rail crossing project as provided for under §15164 of the CEQA Guidelines.

Public Notice
Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 hours prior to the meeting.

Attachments
A. Agreement
B. Adopted preferred concept
Report prepared by:

Hugh Louch, Assistant Public Works Director – Transportation Page F-3.3

SERVICE AGREEMENT

BETWEEN

PENINSULA CORRIDOR JOINT POWERS BOARD

AND THE CITY OF MENLO PARK
FOR

THE MIDDLE AVENUE UNDERCROSSING PROJECT
THIS SERVICE AGREEMENT (“Agreement”) is made and entered into by and between the Peninsula Corridor Joint Powers Board, hereinafter referred to as “PCJPB” or “Caltrain,” and the City of Menlo Park, hereinafter referred to as “City,” as of the last date of signature set forth in the signature blocks.

I. RECITALS

1. Project Description
The City of Menlo Park is the project sponsor for a proposed new bicycle and pedestrian undercrossing of the Caltrain right-of-way (“ROW”) near Middle Avenue in Menlo Park. The project would be located near Caltrain mile post 29.15, north of the intersection of El Camino Real and Ravenswood Avenue. The City of Menlo Park is entering into this Agreement with Caltrain.

The City proposes the installation of a pedestrian and bicycle undercrossing near Burgess Drive and Alma Street to facilitate access between the eastern and western sides of the Caltrain ROW, as well as to and from Alma Street and El Camino Real, both of which run parallel to Caltrain tracks in the project area.

2. Project Background
On August 27, 2019, the Menlo Park City Council unanimously passed a motion to select Concept 3 as the preferred alternative for the Middle Avenue pedestrian and bicycle rail crossing. Upon selection of Concept 3 as the preferred alternative by the City Council, City staff proceeded, in coordination with Caltrain, with finalizing the environmental studies and the design plans. The environmental study prepared is in the form of an Addendum to the Menlo Park El Camino Real and Downtown Specific Plan Environmental Impact Report. The City Council recertified the environmental document on January 28, 2020. Between approximately March 2020 and November 2021, the City worked to negotiate and purchase a portion of the property at 700-800 El Camino needed for this project, but there was little design advancement due in part to the pandemic.

3. Caltrain Processes Background
In February 2020, Caltrain notified the City that the project would not be subject to the then new Rail Corridor Use Policy (RCUP), since Caltrain and the City had already been engaged in significant project development and advancement activities. In a letter sent to the City in May 2020, Caltrain staff documented concerns regarding project delivery and schedule details described in a City staff report, dated January 28, 2020. In this document published by City staff to certify project environmental documents, approve the 30% project plans and authorize the city manager to enter into all necessary Page F-3.4 ATTACHMENT A
Service Agreement
pg. 2
agreements with the PCJPB, staff provided details on the project that had not been agreed to by Caltrain staff, including design-build as the preferred delivery method for the project. Caltrain provided comments on the initial 30% design and identified several resolution items, including relocation of the east side access ramp out of Caltrain ROW.

In June/July 2022, Caltrain again reviewed the City’s 30% design and provided additional comments to the City. Issues requiring resolution upon review of the 30% design include relocation of the undercrossing east side access ramp outside of Caltrain ROW, increase of culvert depth, consideration of lessdisruptive construction methods than cut and cover to avoid disruption of Caltrain service from removal of electrification cables.

In September 2022, Caltrain and City staff held a meeting to discuss the RCUP and process to request use of Caltrain ROW. At this time, Caltrain shared with the City the interpretation that the February 2020 letter exempting the project from the RCUP process was applicable to the tunnel portion of the project only, and the access ramps would need to be considered under the RCUP process if they were to be located partially within Caltrain ROW.

In November 2022, Caltrain shared educational material on the recommended non-disruptive construction methods (Jack and Bore, Mining, or other methods) and participated in a design workshop with City staff and conceptual design consultant to resolve the remaining design issues mentioned above.

4. Third Party Service Agreement During Post Conceptual Design The initial Service Agreement between the City and Caltrain was executed on March 09, 2022 and included coordination with Caltrain staff pertaining to the project’s preliminary engineering phase (30% design).

As the third-party project sponsor, the City is required to coordinate with Caltrain staff as the City advances the project from preliminary engineering to final design. The initial Agreement outlined necessary Caltrain participation and technical review of one preferred design (Concept 3).

Discussions between Caltrain and the City regarding contract(s) ownership during the Final Design and Construction phase occurred during the timeframe of the initial Agreement execution. Caltrain explained that serving as lead implementing agency for all grade separation projects between San Francisco and San Jose will leverage Caltrain’s existing expertise in these kinds of railroad projects.

Therefore, it is understood, by this Service Agreement, that the City elects to advance the project beyond the Preliminary Engineering/Environmental Clearance phase to develop the design for construction, and that Caltrain will assume the project delivery lead when the Preliminary Engineering/Environmental Clearance phase and its deliverables are completed by the City, and a Memorandum Of Understanding (MOU) will be established that addresses funding, roles and responsibilities, budgets, and schedule for the subsequent phases.

The purpose of this Agreement is for Caltrain to:
- Perform an analysis for Alternative Contract Delivery, - Provide for the development and execution an MOU, and Page F-3.5
Service Agreement
pg. 3
- Prepare (a) Request(s) for Proposals (RFPs) for advancing the project beyond the Preliminary Engineering (PE)/Environmental Clearance phase into final design and construction in accordance with the consensus alternative delivery method recommendation.

This Agreement assumes that Caltrain and the City will work to ascertain the most efficient means of completing the project’s NEPA Environmental Clearance and CEQA Determination and that the decision will be further defined as part of the scope described in the MOU.

II. TERMS OF AGREEMENT

1. Scope of Work
To support the review and coordination of the City’s post conceptual design and to develop and execute the Alternative Contract Delivery Analysis, MOU, and the RFPs, the tasks described in this Scope of Work will be completed by Caltrain under this Agreement. It is assumed that regular coordination and document review meetings will be held between participating parties on an asneeded basis, with up to eight (8) meetings among staff for the City, PCJPB, and SMCTA.

Caltrain will provide a Project Manager who is knowledgeable about the project and Caltrain processes, and will lead the coordination efforts among Caltrain, City and SMCTA staff. The City will provide a Project Manager who is knowledgeable about the project and the City’s processes, and will be the main point of contact for PCJPB and the SMCTA.

All tasks include supporting coordination activities for their development, including the preparation of board documents (board resolutions, staff reports, presentations and other administrative tasks required to adopt the recommendation on the optimal delivery method and to finalize the MOU and RFP. This scope of work does not include performing the CEQA/NEPA environmental review processes, procuring environmental permits, or performing 30% to 100% engineering design. These tasks will be performed under the MOU developed through this Agreement.

1.1. Alternative Contract Delivery Analysis
This analysis will recommend the optimal contract delivery method based on the selected local preferred alternative’s unique characteristics and complexities. o Caltrain, the City, and SMCTA to work collaboratively to evaluate alternative contract delivery methods (Design – Bid – Build, Construction Manager/General Contractor, Progressive Design Build, other) to reach a consensus recommendation on the optimal method based on the selected local preferred alternative’s unique characteristics and complexities.
o This Agreement assumes that Caltrain will prepare for and conduct one (1) one-day Project Delivery Assessment Workshop with two (2) analysis focuses: a qualitative analysis and a quantitative analysis.
▪ Caltrain will prepare background materials with support of the City, and create the workshop agenda and handout materials necessary to conduct the qualitative and quantitative parts of the workshop. Caltrain, SMCTA and the City to Page F-3.6
Service Agreement
pg. 4
provide input to various qualitative and quantitative factors involved in the Project Delivery Method analysis.
▪ Caltrain staff will facilitate the workshop.
▪ This Agreement assumes that Caltrain will use the Transportation Research Board’s TCRP Report 131 “Project Delivery Method Selection Tool for Transit Projects” and Caltrans Modified Quantitative Project Delivery Method Selection, as base template for its evaluation. If the parties agree on proposed delivery method, Caltrain to document the consensus recommendation in an Alternative Project Delivery Decision Report.

1.2. Development of a Memorandum of Understanding (MOU) o Caltrain staff will coordinate with the City and SMCTA for development of standard MOU outline.
o The MOU will define all parties’ roles and responsibilities and overall scope of work to be contained in the MOU among the City, SMCTA, and Caltrain. o Caltrain staff will develop MOU Exhibit A-Work Plan and budget. o Caltrain will provide on-going coordination activities for MOU Development (ongoing coordination among City, SMCTA, and Caltrain staff; support of staff reports, presentations, budgets, etc.) and supporting materials to facilitate the execution of the MOU.
o Caltrain will facilitate up to three (3) meetings among the City, funding partners, and Caltrain staff to agree on MOU final terms.

1.3 Development of Request(s) For Proposals (RFPs)
o Caltrain will develop one or more RFPs for advancing the project beyond the PE/Environmental Clearance phase into final design and construction in accordance with the consensus alternative delivery method recommendation. The scope of work for the draft RFP will vary as necessary based on the selected contract delivery model.

Environmental review-related tasks such as CEQA/NEPA environmental review processes, and procuring environmental permits, will be advanced through a separate contract by Caltrain’s Environmental On-Call consultants. o Caltrain will provide draft RFP(s) to the City for its review and will incorporate up to two (2) rounds of the City’s comments.
o Caltrain will conduct any additional research required to ensure that advanced design criteria comply with Caltrain’s standards.
o Caltrain staff will develop f board documents such as board resolutions, staff reports, Power Point presentations, and other supporting materials to seek authorization of the issuance of the RFP(s) by the PCJPB.
o The RFP(s) will be subject to legal review by Caltrain and City legal counsel.

Page F-3.7
Service Agreement
pg. 5

2. Project Delivery Process & Schedules

2.1 Capital Projects Delivery
Caltrain has an internal capital projects delivery process that defines distinct phases and periodic check-ins after each project phase. (See Appendix D). This methodology is used as quality control oversight by Caltrain leadership to ensure that projects proceed in alignment with scope, budget, and schedule as approved in the capital budget. The span of this Agreement is included as part of Phase Gate 3.

2.2 Estimated Milestones
This information is offered for reference. As project-specific schedules are developed, these check-in points will be identified as milestones in accordance with this process. For this project, initial estimated milestone dates are:

Gate 1 - Project Initiation Jan 27, 2022
Gate 2 - 15% Development Complete NA
Gate 3 - 35% Development Complete June, 2023
Gate 4 - 65% Development Complete TBD
Gate 5 - 100% Development Complete TBD
Gate 6 - Substantial Completion TBD
Gate 7 - Start-Up / Turnover Complete TBD
Gate 8 - Project Closeout Complete TBD
As relates to Agreement tasks, the estimated timelines and milestones are included below. These timelines assume concurrence from both Caltrain and City staff for the project’s design revisions, any related supplemental environmental clearance and adoption of the design revisions by Menlo Park City Council. These timelines may be adjusted as circumstances require upon the written agreement of the parties, which shall not be unreasonably withheld.

Expected durations of tasks:

A M J J A S O N D J F M A M J
Task 1 - Alternative Contract Delivery Analysis
Task 2 - Development of a Memorandum of Understanding (MOU) Task 3 - Development of the RFPs
Service Agreement Estimated Timeline
2023 2024
Caltrain FY23 FY24
Page F-3.8
Service Agreement
pg. 6

3. Work Product Review Periods
The estimated timeline above includes Caltrain and City review periods.

It is anticipated that the City will require up to three (3) weeks to review documents produced by Caltrain. Caltrain will require up to three (3) weeks to incorporate the City’s comments into the deliverables.

4. Budget, Reporting, and Payment
As consideration for the services provided by Caltrain under this Agreement, the City will pay the costs for Caltrain’s services, as estimated herein. Costs associated with activities described within this Agreement have been estimated based on Caltrain’s current understanding of the project to date and information provided by the City. This estimate is not intended to represent final project costs or bid cost. Every effort will be made by all parties to keep the overall project’s cost as low as possible while delivering the intended scope and objectives within schedule.

4.1 Progress Reports
Caltrain will provide the City with quarterly progress reports on expenditures and the City will provide Caltrain with quarterly progress reports on related activities and funding updates.

4.2 Estimated Budget
The overall estimated budget for this Agreement is $571,940.60, of which $89,278.60 is included as contingency funds. (See Appendix B).

The estimated budget for Alternative Contract Delivery Analysis is estimated at $200,172.00. This conservative estimate assumes this task will be completed by an outside consultant from Caltrain’s oncall consultant bench, with oversight by Caltrain staff. Prior to initiating this task, should Caltrain determine there is available in-house staff with the appropriate expertise and availability to complete this task, a revised estimate for this task will be provided to the City.

The estimated budget for MOU development is $32,944.00.

The estimated budget for RFP(s) development assumes that the project will be delivered through the Construction Manager/General Contractor (CMGC) method. The estimated budget for RFP(s) development includes development of an RFP for CMGC ($156,000) as well as development of an RFP for final design ($93,546.00). Should CMGC be selected for the contract delivery method, both RFPs would be required. If another delivery method is selected through the Alternative Contract Delivery Analysis, then the estimated budget for RFP(s) development would suffice and a revised estimate for this task would be provided to the City, upon written request.

Page F-3.9
Service Agreement
pg. 7

4.3 Caltrain Fully Burdened Unit Cost Rates and Contingency Funds Caltrain’s billing rates are designed to ensure reimbursement of actual costs to Caltrain for provided services on third-party projects.

Caltrain’s billing rates include actual salaries and fringe benefit costs, which are billed as direct labor costs. Additionally, Caltrain rates also include indirect labor costs in the form of Internal Cost Allocation Plan (ICAP) rates, which reflect actual overhead costs that are not efficient to charge directly to the project, such as financial services.

Both fringe benefit costs and estimated ICAP rate are updated on a fiscal year (FY) basis. More details on the current rates applied to San Mateo County Transit District (“District”) labor including Caltrain, Consultants and Non-labor, in Appendix C.

Contingency provides funds for additional hours. Contingency funds will not be utilized without prior written (via email) authorization from the City. However, the City’s authorization for the release of contingency funds will not be unreasonably withheld. See Appendix B for budget details.

It is understood that Caltrain may submit a written request to the City for annual labor rate update, no later than 30 days before the start of the succeeding fiscal year, to be effective the first day of the subsequent fiscal year, or the date of Caltrain’s request, whichever date is later. Caltrain may also submit a written request to City for labor rate changes upon staff changes. Increases in future negotiated fully burden billing rates, if requested, shall be limited to an annually negotiated, not-toexceed percentage, according to the Construction Cost Index from the Engineering News Record for the San Francisco Bay Area. Caltrain’s requests for new rates shall be subject to approval by the City, which approval shall not be unreasonably withheld.

4.4 Invoices
The PCJPB will invoice the City for work performed under this Agreement quarterly in arrears.

Payment by the City is due 30 days following the date of each invoice.

The City may elect to apply any remaining, un-used budget from previous agreements related to Middle Avenue Undercrossing Project, to the balance due for this SA budget.

5. Term of Agreement
It is understood by all parties that this Agreement will terminate on June 30, 2024, unless it is mutually agreed upon by both Caltrain (e.g. Capital Delivery PM) and the City (e.g. Public Works Director) to extend the duration of this Agreement.

6. Governing Law
This Agreement shall be interpreted, construed, and enforced in accordance with the laws of California.

7. Amendments
This Agreement may be amended at any time and from time to time, provided such amendments are in writing and executed by the Parties.

Page F-3.10
Service Agreement
pg. 8

8. Entire Agreement
This Agreement constitutes the entire agreement of the Parties with respect to its subject matter and supersedes any prior oral or written understanding on the same subject.

IN WITNESS WHEREOF, PCJPB and the City execute this Agreement as follows with the intent to be legally bound:

PENINSULA CORRIDOR CITY OF MENLO PARK

JOINT POWERS BOARD
By: By:
__________________________________ ___________________________________ Michelle Bouchard Justin Murphy
Executive Director City Manager
__________________________________ ___________________________________ Date Date
Approved as to Form: Approved as to Form:
__________________________________ ___________________________________ James C. Harrison Nira Doherty
General Counsel City Attorney
__________________________________ ___________________________________ Date Date
Page F-3.11
Service Agreement
pg. 9
Appendix A - Middle Avenue Undercrossing – Project Drawings Page F-3.12
Appendix B – Middle Avenue Undercrossing Service Agreement Tasks Budget

1. These FB Unit Cost Rates are offered as placeholders. They may or may not be updated prior to this Agreement getting executed. Caltrain Fully Burdened Unit
Cost Rates
(FY23)
Position Staff Name Hours Fee Hours Fee Hours Fee Hours Fee $ 211.00 Deputy Chief, Design and Construction Robert Barnard 0 $ - 0 $ - 4 $ 844 4 $ 844 $ 297.00 Director, Capital Program Delivery Andy Robbins 12 $ 3,564 16 $ 4,752 40 $ 11,880 68 $ 20,196 $ 139.00 Senior Project Manager Arul Edwin 16 $ 2,224 44 $ 6,116 248 $ 34,472 308 $ 42,812 1 $ 158.00 Senior Structural Engineer TBD 0 $ - 6 $ 948 8 $ 1,264 14 $ 2,212 $ 198.00 Engineering Director Zouheir Farah 16 $ 3,168 22 $ 4,356 40 $ 7,920 78 $ 15,444 $ 174.00 Engineering Infrastructure Manager Bin Zhang 14 $ 2,436 18 $ 3,132 36 $ 6,264 68 $ 11,832 $ 127.00 Senior Track Engineer TBD 0 $ - 0 $ - 0 $ - 0 $ - 1 $ 185.00 Resident Engineer N/A 0 $ - 0 $ - 0 $ - 0 $ - 1 $ 200.00 District Temp/Annuitant Patrick May 0 $ - 0 $ - 70 $ 14,000 70 $ 14,000 1 $ 169.00 Procurement Manager Alice Cho 0 $ - 0 $ - 16 $ 2,704 16 $ 2,704 $ 169.00 Dir. Contracts and Procurement Kevin Yin 0 $ - 0 $ - 8 $ 1,352 8 $ 1,352 $ 203.00 Deputy Chief, Planning Dahlia Chazan 0 $ - 2 $ 406 2 $ 406 4 $ 812 $ 135.00 Deputy Director, Capital Planning Nicole Soultanov 4 $ 540 16 $ 2,160 10 $ 1,350 30 $ 4,050 $ 260.00 Capital Planning Support Dennis Kearney 4 $ 1,040 16 $ 4,160 10 $ 2,600 30 $ 7,800 $ 122.00 Principal Planner, Access Planning Dan Provence 0 $ - 2 $ 244 6 $ 732 8 $ 976 $ 159.00 Dep Director, Prg Management & Env Comp Hilda Lafebre 0 $ - 8 $ 1,272 6 $ 954 14 $ 2,226 $ 123.00 Cap Projects & Env. Pl, Manager Bonny Oconnor 0 $ - 8 $ 984 6 $ 738 14 $ 1,722 $ 189.00 Environmental Planning Support Jonathan Carey 0 $ - 4 $ 756 4 $ 756 8 $ 1,512 1 $ 413.00 Legal Counsel TBD 0 $ - 6 $ 2,478 10 $ 4,130 16 $ 6,608 $ 100.00 Government Affairs Acting Manager Lori Low 0 $ - 8 $ 800 8 $ 800 16 $ 1,600 $ 95.00 Government Affairs Officer TBD 0 $ - 4 $ 380 4 $ 380 8 $ 760 66 $ 12,972 180 $ 32,944.00 536 $ 93,546.00 782 $ 139,462.00 30% $ 3,891.60 $ 9,883.20 $ 28,063.80 $ 41,838.60
$ - $ - $ 47,440.00 $ 47,440.00
$ 187,200 $ - $ 156,000.00 $ 343,200.00
$ 204,063.60 $ 42,827.20 $ 325,049.80 768 $ 432,478.60
$ 571,940.60
*Estimated consultant costs include 4% Caltrain mark-up Legal Counsel
G&CA
Subtotal
Contingency/Additional Costs
Contingency
Consultant Costs*
Subtotal adjusted
Total Including Contingencies
RFP Contingency
Environmental Planning
Infrastructure Engineering
Procurement and Contracts
Task 3
RFPs Development
Planning
Totals
Project Delivery
Task 1 Alternative
Contract Delivery
Analysis
Task 2
MOU Development
Page F-3.13
Appendix C – Caltrain Fully Burdened Unit Cost Rates, 2023 Caltrain Fully Burdened Unit Cost Rates – 2023
Effective July 1, 2022 these rates should be applied to District labor, Consultants and Non-Labor for purposes of external agreements with the District. Rates will be updated annually, and the District reserves the right to update rates a maximum of one time during the year, if warranted. The District will communicate all such changes in writing.

The San Mateo County Transit District (District) provides motorbus, paratransit and shuttle service in San Mateo County. The District also administers and manages the day-to-day operations of the Peninsula Corridor Joint Powers Board (PCJPB)/Caltrain; San Mateo County Transportation Authority (TA); and San Mateo County Express Lane Joint Powers Authority (JPA). The District uses cost allocation and rate setting methodologies to assign and recover costs incurred by providing services shared by all agencies.

Fully Burdened Rate for Onsite Consultants and Non-Labor Items: Unit Cost + ICAP Agency Indirect Costs (AIA): Onsite consultants and non-labor items are “grossed up” to add in Agency Indirect Costs (AIA) and Capital Overhead. Taken together, these components are referred to as the Internal Cost Allocation Plan Rate, which is supported by an audited Internal Cost Allocation Plan (ICAP) using statistics appropriate to the costs allocated.

AIA costs benefit all agencies and include staff in support departments such as Human Resources, Information Technology and Telecommunications, Treasury, Accounting and Budgets, Security, Facilities Maintenance and Contracts & Procurement. All staff time devoted to shared service activities are recorded to the AIA project category within the accounting system. Annually, AIA costs are allocated to the appropriate benefiting agencies through the ICAP.

Capital Overhead: Capital costs associated with pooled support costs that cannot be directly attributed to a specific capital project, including labor and non-labor costs specific to each agency’s capital projects, are recorded to the Capital Overhead project within the accounting system. A rate is used to charge for the three categories of costs. The rates are calculated and updated on an annual basis.

Fully Burdened Rate for Employees: Unit Cost + ICAP + Fringe Benefits The fully burdened rate for employee includes the ICAP rate shown above, and also includes Employee Fringe Benefits.

Fringe benefits cover costs associated with payroll taxes, pension plan contributions, group insurance premiums (medical, dental, vision coverages), life insurance, long-term disability, unemployment insurance, and paid time off (PTO). These costs are initially paid by the District and charged to benefitting agencies through the application of a fringe benefit rate.

Page F-3.14
Appendix D – Caltrain Phase/Gate Process
Page F-3.15
Service Agreement
pg. 13
Page F-3.16

ATTACHMENT B
Page F-3.17
Community Development
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov

STAFF REPORT
City Council
Meeting Date: 4/4/2023
Staff Report Number: 23-097-CC
Public Hearing: Consider an appeal of the Planning Commission approval of a use permit to demolish an existing
single-story, single-family residence and construct
a new two-story residence with an attached garage
on a substandard lot at 440 University Drive and
determine this action is categorically exempt under
CEQA Guidelines §15303’s Class 3 exemption for
new construction or conversion of small structures
Recommendation
Staff recommends that the City Council adopt a resolution denying the appeal and upholding the Planning Commission’s approval of a use permit to demolish an existing one-story, single-family residence and construct a new two-story residence with an attached garage on a substandard lot with regard to minimum lot width and area in the R-1-U (Single Family Urban Residential) zoning district located at 440 University Drive. The draft resolution is included as Attachment A.

Policy Issues
Each use permit request is considered individually. The City Council should consider whether the required use permit findings can be made for the proposal.

Background
Project description
The subject property is located on the northeastern side of University Drive, between Middle Avenue and College Avenue in the Allied Arts neighborhood. The subject lot and all neighboring properties are located in the R-1-U (Single Family Urban Residential) zoning district. A location map is included as Attachment B.

This block of University Drive features many one-story homes in the ranch and Spanish architectural styles, but several properties have been redeveloped with newer two-story homes with primarily craftsman architectural styles.

The applicant is proposing to demolish the existing one-story, single-family residence and construct a new two-story, single-family residence with an attached accessory dwelling unit (ADU). The ADU is not subject to discretionary review. A data table summarizing parcel and project characteristics is included in Attachment C. The project plans and project description letter are included in Attachment A as Exhibits A and B, respectively.

The proposed residence would be a three-bedroom, three-and-one-half bathroom home. The attached ADU would also be located on the first floor. The required parking for the primary dwelling would be provided by an attached, front-loading, two-car garage. The proposed residence would meet all Zoning Ordinance AGENDA ITEM G-1 Page G-1.1
Staff Report #: 23-097-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov requirements for setbacks, lot coverage, floor area limit (FAL), daylight plane, parking and height.

The proposed residence would exceed the setback requirements on all sides as shown in the data table (Attachment C). The proposed second story would be stepped back from the first story on the front and right side, and a portion of the left side. The second story would be stepped back to 26 feet, two inches on the front, approximately nine feet, three inches on the right side, and to approximately 12 feet, two inches along the front two-thirds of the left side.

Planning Commission review
On February 6, 2023, the Planning Commission reviewed the project. There was one public commenter (appellant) who expressed her opposition to the project. The Planning Commission discussed whether a shade study had been conducted for the project and if the applicant was willing to include obscured glass in the stairwell window to increase privacy. After considering public comments on the proposal, the Planning Commission approved the project with a condition to include obscured glass in the stairwell window, 4-0-2, with two commissioners abstaining. A hyperlink to the staff report from the February 6, 2023 Planning Commission meeting is included as Attachment C. The Planning Commission Resolution, including conditions of approval, is included as Attachment D, and draft minutes from the February 6, 2023 meeting are included as Attachment E.

Analysis
Appeal of the Planning Commission action
On February 17, 2023, the City received an appeal of the Planning Commission’s approval of the use permit. The appeal was submitted by Elizabeth Houck, a resident of Menlo Park. A portion of Ms. Houck’s side property line (883 Middle Avenue) abuts the subject property’s rear property line. The appellant provided written comments prior to the hearing and verbal testimony that was considered by the Planning Commission at the public hearing. The appeal letter (Attachment F) outlines several points which are discussed below. The concerns outlined in the letter are similar to the concerns raised at the Planning Commission hearing. The points included in the appeal letter (in italics) and staff’s response are summarized below:
a. Information presented by both staff and the builder were factually incorrect.

The area plan (Sheet AP1 of the plans), which shows the subject lot and the surrounding properties for context, appears to have an error and does not show an accessory building in the rear of the appellant’s house. The location of the building appears to be directly behind the main residence and not in the southeast corner of the appellant’s property (nearest to the subject property). The applicant has updated the area plan in the plan set (Attachment A, Exhibit A) to include the accessory building, which is located approximately 64 feet away from the proposed residence. Aside from this correction, staff believes that the information presented in the staff report and in the plan set is accurate. b. The residence will block current and future solar access.

The proposed residence complies with all height limits, setbacks, and daylight plane requirements intended to maintain solar access. The location of the proposed second story would not cause any unique impacts to solar access.
c. There is an opportunity to move the house two feet closer to the street.

While the living space of the proposed residence is proposed approximately one foot, eight inches from the required 20-foot front setback line, there is a covered porch in the front of the residence which is proposed only two inches from the front setback line. Moving the residence forward two feet would render the porch Page G-1.2
Staff Report #: 23-097-CC

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov nonconforming, and the residence would need to be redesigned to comply with the required front setback. d. The Planning Commission should have required the applicant to provide taller landscaping than their current plans to screen the proposed residence.

The proposed project includes a planting plan which indicates one crape myrtle tree to be planted in the northwest corner of the property to screen the proposed house from the appellant’s property. Other existing trees are proposed to remain on the subject property. Screening hedges are limited to seven feet in height, and additional tree plantings may conflict with existing trees. e. The second story should be moved five to eight feet further from the rear property line.

The second story is located 10 inches from the minimum 20-foot rear setback line and toward the right side of the subject property (away from the appellant’s residence). There does not appear to be any buildings in the southeast corner of the appellant’s property, and therefore, the location of the proposed second story would not cause any unique impacts to privacy.
f. The approval was not unanimous.

Two Planning Commissioners abstained from voting, however, the project received unanimous approval from the voting Commissioners. Furthermore, project approval does not need to be unanimous, but they require a majority of the Commissioners present and voting, in this case four votes. g. Thomas James Homes is in financial peril and there needs to be accountability for the construction timeline and not let the property go fallow.

The City does not speculate on the financial situation of private businesses. Should the use permit be granted, the permit is valid for a period of one year, unless an extension is approved or a complete building permit application has been submitted. Once a building permit has been filed and/or issued, progress is needed in order to remain active and valid.
h. The ADU is a square footage grab and a separate entrance is required.

ADUs are allowed to exceed the maximum floor area limit by up to 800 square feet per the City’s Zoning Ordinance and required by State Law. The ADU has a separate exterior entrance shown on the floor plans (Sheet A.4). ADUs are allowed to have interior access to the main residence, provided the door has a double-locking mechanism, which is also noted on the floor plan.

City Council options on the appeal
Per §16.86.040 of the zoning ordinance, the City Council may affirm, reverse, or modify the decision of the Planning Commission. To reverse or modify the Planning Commission’s decision shall require the affirmative vote of three-fifths of the City Council (or three City Councilmembers.) If the City Council does not take any action on the appeal, the Planning Commission’s action shall be deemed affirmed. The City Council’s action would be considered final and the decision may not be appealed.

Correspondence
Staff has not received any additional items of correspondence on this item as of publication of the staff report.

Conclusion
Staff believes that the design, scale, and materials of the proposed residence are generally compatible with the surrounding neighborhood. Staff believes the proposed residence would not create an undue burden on the appellant’s property and would not be detrimental to the health, safety, morals, comfort, and general welfare of the neighborhood. Staff recommends that the City Council deny the appeal and uphold the Page G-1.3
Staff Report #: 23-097-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov Planning Commission’s approval of the proposed project.

Impact on City Resources
Appeals of Planning Commission decisions on someone else’s project by Menlo Park residents are subject to a flat-rate fee of $110 and are not subject to cost recovery fees.

Environmental Review
The project is categorically exempt under Class 3 (§15303, “New Construction or Conversion of Small Structures”) of the current California Environmental Quality Act (CEQA) Guidelines.

Public Notice
Public Notification was achieved by posting the agenda, with the agenda items being listed, at least 72 hours prior to the meeting. Public notification also consisted of publishing a notice in the local newspaper and notification by mail of owners and occupants within a 300-foot radius of the subject property.

Attachments
A. Draft City Council resolution denying the appeal and upholding the Planning Commission’s approval of the project Use Permit
Exhibits to Attachment A:

A. Project plans
B. Project description letter
C. Conditions of approval
B. Location map
C. Hyperlink – February 6, 2023 Planning Commission staff report:
menlopark.gov/files/sharedassets/public/agendas-and-minutes/planning-commission/2023- meetings/agendas/20230206-planning-commission-agenda-packet-compressed-1.pdf#page=250 D. Planning Commission resolution
E. Draft February 6, 2023 Planning Commission meeting minutes F. Appeal letter – February 17, 2023
Report prepared by:

Chris Turner, Associate Planner
Report reviewed by:

Corinna Sandmeier, Principal Planner
Deanna Chow, Assistant Community Development Director
Page G-1.4
RESOLUTION NO. XXXX

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK

DENYING AN APPEAL AND UPHOLDING THE PLANNING COMMISSION

APPROVAL OF A USE PERMIT FOR THE DEMOLITION OF AN EXISITNG

ONE-STORY, SINGLE-FAMILY RESIDENCE AND CONSTRUCTION OF A NEW

TWO-STORY, SINGLE-FAMILY RESIDENCE ON A SUBSTANDARD LOT WITH REGARD TO MINIMUM LOT WIDTH AND AREA IN THE R-1-U (SINGLE FAMILY URBAN RESIDENTIAL) ZONING DISTRICT LOCATED AT 440

UNIVERSITY DRIVE
WHEREAS, the City of Menlo Park (“City”) received an application requesting to demolish an existing one-story, single-family residence, and construct a new two-story residence on a substandard lot with regard to minimum lot width and area in the Single Family Urban Residential (R-1-U) zoning district (the “Project”) from Thomas James Homes (“Owner” and “Applicant”) located at 440 University Drive (APN 071-403-280) (“Property”). The Project use permit is depicted in and subject to the development plans and project description letter which are attached hereto as Exhibit A and Exhibit B, respectively, and incorporated herein by this reference; and WHEREAS, the Property is located in the Single Family Urban Residential (R-1-U) district. The R1-U district supports single-family residential uses; and WHEREAS, the proposed Project complies with all objective standards of the R-1-U district; and WHEREAS, the proposed Project was reviewed by the Engineering Division and found to be in compliance with City standards; and
WHEREAS, the Applicant submitted an arborist report prepared by California Tree and Landscaping Consulting, Inc. which was reviewed by the City Arborist and found to be in compliance with the Heritage Tree Ordinance and proposes mitigation measures to adequately protect heritage trees in the vicinity of the project; and WHEREAS, the Project, requires discretionary actions by the City as summarized above, and therefore the California Environmental Quality Act (“CEQA,” Public Resources Code Section §21000 et seq.) and CEQA Guidelines (Cal. Code of Regulations, Title 14, §15000 et seq.) require analysis and a determination regarding the Project’s environmental impacts; and WHEREAS, the City is the lead agency, as defined by CEQA and the CEQA Guidelines, and is therefore responsible for the preparation, consideration, certification, and approval of environmental documents for the Project; and
WHEREAS, the Project is categorically except from environmental review pursuant to Cal. Code of Regulations, Title 14, §15303 et seq. (New Construction or Conversion of Small Structures); and WHEREAS, all required public notices and public hearings were duly given and held according to law; and
WHEREAS, at a duly and properly noticed public hearing held on February 6, 2023, the Planning Commission fully reviewed, considered, and evaluated the whole of the record including all public ATTACHMENT A Page G-1.5
and written comments, pertinent information, documents and plans, prior to taking action regarding the Project; and
WHEREAS, the Planning Commission made use permit findings and approved the use permit for the proposed residence and conditioned the project to include obscured glass in the stair well window to increase privacy; and
WHEREAS, the project was appealed to the City Council by the owner of 883 Middle Avenue with the 15-day appeal period; and
WHEREAS, at a duly and properly noticed public hearing held on April 4, 2023, the City Council fully reviewed, considered, and evaluated the whole of the record including all public and written comments, pertinent information, documents and plans, prior to taking action regarding the Project; NOW, THEREFORE, THE MENLO PARK CITY COUNCIL HEREBY RESOLVES AS FOLLOWS:

Section 1. Recitals. The City Council has considered the full record before it, which may include but is not limited to such things as the staff report, public testimony, and other materials and evidence submitted or provided, and the City Council finds the foregoing recitals are true and correct, and they are hereby incorporated by reference into this Resolution.

Section 2. Denial of Appeal. The City Council hereby denies Appeal No.________ (appeal of Elizabeth Houck), upholds the Planning Commission Actions, and approves the use permit, for the 440 University Avenue development project based on the following findings:

1. The grounds upon which the appellant has submitted its appeal of the Planning Commission Actions are not a basis to reverse the Planning Commission Actions and deny the project:
a. Information presented by both staff and the builder were factually incorrect.

The area plan(Sheet AP1 of the plans), which shows the subject lot and the surrounding properties for context, appears to have an error and does not show an accessory building in the rear of the appellant’s house. The location of the building appears to be directly behind the main residence and not in the southeast corner of the appellant’s property (nearest to the subject property). The applicant has updated the area plan in the plan set (Attachment A Exhibit A) to include the accessory building, which is located approximately 64 feet away from the proposed residence.

Aside from this correction, staff believes that the information presented in the staff report and in the plan set is accurate.
b. The residence will block current and future solar access.

The proposed residence complies with all height limits, setbacks, and daylight plane requirements intended to maintain solar access. The location of the proposed second story would not cause any unique impacts to solar access.
c. There is an opportunity to move the house two feet closer to the street.

While the living space of the proposed residence is proposed approximately one foot, eight inches from the required 20-foot front setback line, there is a covered porch in the front of the residence which is proposed only two inches from the front setback line. Moving the residence forward two feet would render the porch nonconforming, and the residence would need to be redesigned to comply with the required front setback.
d. The Planning Commission should have required the applicant to provide taller landscaping than their current plans to screen the proposed residence.

Page G-1.6
The proposed project includes a planting plan which indicates one crape myrtle tree to be planted in the northwest corner of the property to screen the proposed house from the appellant’s property.

Other existing trees are proposed to remain on the subject property. Screening hedges are limited to seven feet in height, and additional tree plantings may conflict with existing trees. e. The second story should be moved five to eight feet further from the rear property line.

The second story is located 10 inches from the minimum 20-foot rear setback line and towards the right side of the subject property (away from the appellant’s residence). There does not appear to be any buildings in the southeast corner of the appellant’s property, and therefore, the location of the proposed second story would not cause any unique impacts to privacy. f. The approval was not unanimous.

Two Planning Commissioners abstained from voting, however, the project received unanimous approval from the voting Commissioners. Furthermore, project approval does not need to be unanimous, but they require a majority of the Commissioners present and voting, in this case four votes.
g. Thomas James Homes is in financial peril and there needs to be accountability for the construction timeline and not let the property go fallow.

The City does not speculate on the financial situation of private businesses. Should the use permit be granted, the permit is valid for a period of one year, unless an extension is approved or a complete building permit application has been submitted. Once a building permit has been filed and/or issued, progress is needed in order to remain active and valid. h. The ADU is a square footage grab and a separate entrance is required.

ADUs are allowed to exceed the maximum floor area limit by up to 800 square feet per the City’s Zoning Ordinance and required by State Law. The ADU has a separate exterior entrance shown on the floor plans (Sheet A.4). ADUs are allowed to have interior access to the main residence, provided the door has a double-locking mechanism, which is also noted on the floor plan.

Section 3. Conditional Use Permit Findings. The City Council of the City of Menlo Park does hereby make the following Findings:

The denial of the appeal and approval of the use permit for the construction of new two-story residence on a substandard lot is granted based on the following findings which are made pursuant to Menlo Park Municipal Code Section 16.82.030:

1. That the establishment, maintenance, or operation of the use applied for will, under the circumstance of the particular case, not be detrimental to the health, safety, morals, comfort and general welfare of the persons residing in the neighborhood of such proposed use, or injurious or detrimental to property and improvements in the neighborhood or the general welfare of the city because:
a. Consideration and due regard were given to the nature and condition of all adjacent uses and structures, and to general plans for the area in question and surrounding areas, and impact of the application hereon; in that, the proposed use permit is consistent with the R-1-U zoning district and the General Plan because two-story residences are allowed to be constructed on substandard lots subject to granting of a use permit provided that the proposed residence conforms to applicable zoning standards, including, but not limited to, minimum setbacks, maximum floor area limit, and maximum building coverage. b. The proposed residence would include the required number of off-street parking spaces because one covered and one uncovered parking space would be required at a minimum, Page G-1.7
and two covered parking spaces are provided.

Section 4. Conditional Use Permit. The City Council denies the appeal and upholds the Planning Commission approval of Use Permit No. PLN2022-00050, which use permit is depicted in and subject to the development plans and project description letter, which are attached hereto and incorporated herein by this reference as Exhibit A and Exhibit B, respectively. The Use Permit is conditioned in conformance with the conditions attached hereto and incorporated herein by this reference as Exhibit C.

Section 5. Environmental review. The City Council makes the following findings, based on its independent judgment after considering the Project, and having reviewed and taken into consideration all written and oral information submitted in this matter:

A. The Project is categorically except from environmental review pursuant to Cal. Code of Regulations, Title 14, §15303 et seq. (New Construction or Conversion of Small Structures) Section 6. Severability
If any term, provision, or portion of these findings or the application of these findings to a particular situation is held by a court to be invalid, void or unenforceable, the remaining provisions of these findings, or their application to other actions related to the Project, shall continue in full force and effect unless amended or modified by the City.

I, Judi A. Herren, City Clerk of Menlo Park, do hereby certify that the above and foregoing City Council Resolution was duly and regularly passed and adopted at a meeting by said City Council on the fourth day of April, 2023, by the following votes:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Official Seal of said City on this __ day of April, 2023.

Judi A. Herren, City Clerk
Exhibits:

A. Project plans
B. Project description letter
C. Conditions of approval
Page G-1.8
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH JOB NO.

DATE
A.0

COVER SHEET
440 University Dr. MENLO PARK, CA
PLANNING SUBMITTAL FOR:

VICINITY MAP:

N

NOT TO SCALE
DeveloperThomas James Homes255 Shoreline Dr Suite 428Redwood City, CA 94065Tel: (408) 402-3024ArchitectDahlin Group 5865 Owens Drive Pleasanton, CA 94588Tel: (925) 251-7200 Contact: Jaime [email protected] LandscapeVan Dorn Abed Landscape Architects, Inc.81 14th Street,San Francisco, CA 94103Tel: (415) 864-1921Contact: Hoanglan [email protected] PROJECT TEAM INFO: ARCHITECTURAL:

A.0 TITLE SHEET
A.1 SITE AERIAL & PHOTOS
AP1 AREA PLANA.3 SITE PLANA.4 FLOOR PLANSA.5 ROOF PLANA.6 FLOOR AREA DIAGRAMSA.7 ELEVATIONSA.8 ELEVATIONS A.9 SECTIONSA.10 COLORS & MATERIALS

RENDERING & COLOR BOARD
AS-BUILTS:1 FLOOR PLAN2 ROOF PLAN3 EXTERIOR ELEVATIONSCIVIL:TO1 TOPOGRAPHIC SURVEYLANDSCAPE:L1.1 CALLOUT/ LAYOUT PLANL1.2 CONSTRUCTION DETAILSL2.1 IRRIGATION NOTES & WELO CHECKLISTL3.1 PLANTING PLAN & LEGENDL3.2 PLANTING DETAILSL3.3 TREE PROTECTION PLAN & NOTES SHEET INDEX:

LOCATION 440 UNIVERSITY DR.ASSESSOR’S PARCEL NUMBER 071-403-280 PARCEL AREA - GROSS 5,200 SQ. FT. 0.12 AC ZONING DESIGNATION R-1-UOCCUPANCY GROUP R-3CONSTRUCTION TYPE V-B MAX. FLOOR AREA LIMIT 2,800.00 SQ. FT. PROPOSED FLOOR AREA LIMIT 2755.84 SQ. FT.

FAL (INCLUDING ADU
EXCEEDANCE) 3033.12 SQ. FT.

MAX. BUILDING COVERAGE 1,820.00 SQ. FT. PROPOSED BUILDING COVERAGE 1,778.84 SQ. FT. (5,200)(.35)

PROPOSED BUILDING COVERAGE
(INCLUDING ADU EXCEEDANCE) 2056.12 SQ. FT.

MAX. BUILDING HEIGHT 28’ PROPOSED BUILDING HEIGHT 26’-3 1/2”

FROM ANG

REQUIRED SETBACKS
FRONT - STREET (FT) 20’
FRONT - STREET- AT GARAGE (FT) 20’
SIDE (FT) 5’-3”REAR (FT) 20’
PARKING REQUIRED:
2 TOTAL SPACES
MIN. GARAGE DIMENSIONS: 10’ X 20’ PER SPACE
EXISTING USE: ONE SINGLE FAMILY DETACHED RESIDENCE OF TO BE DEMOLISHED.PROPOSED USE: ONE NEW SINGLE FAMILY DETACHED RESIDENCE OF 3033.12 SQ. FT.CODES AND REGULATIONS GOVERNING THE PROJECT: CURRENT 2022 CALIFORNIA CODES

PROPOSED SETBACKS
FRONT - STREET (FT) 21’-8”
FRONT - STREET- AT GARAGE (FT) 24’-8”
SIDE - RIGHT (FT) 5’-4 1/2”SIDE - LEFT (FT) 8’-1 1/2”REAR (FT) 20’-10” ALL EXISTING CRACKED OR DAMAGED FEATURES ALONG THE PROPERTY FRONTAGE MUST BE REPAIRED IN KIND. ADDITIONALLY, ANY FRONTAGE IMPROVEMENTS WHICH ARE DAMAGED AS A RESULT OF CONSTRUCTION WILL BE REQUIRED TO BE REPLACED. ALL FRONTAGE IMPROVEMENT WORK SHALL BE IN ACCORDANCE WITH THE LATEST VERSION OF THE CITY STANDARD DETAILS.ANY ENCROACHMENT PERMIT FROM THE ENGINEERING DIVISION IS REQUIRED PRIOR TO ANY CONSTUCTION ACTIVITIES, INCLUDING UTILITY LATERALS, IN THE PUBLIC RIGHT OF WAY.

DEVELOPMENT SUMMARY

FRONTAGE IMPROVEMENTS
440 UNIVERSITY DR.

FIRST FLOOR 1031.59 SQ. FT.

SECOND FLOOR 1287.00 SQ. FT. TOTAL LIVING 2318.59 SQ. FT. GARAGE 437.25 SQ. FT. ADU 277.28 SQ. FT. PORCH 54.50 SQ. FT. LANAI 247.50 SQ. FT. TOTAL: (LIVING + GARAGE) 2755.84 SQ. FT.

FAL: (LIVING + GARAGE + ADU) 3033.12 SQ. FT. MAX. FAL: 2800.00 SQ. FT.

THOMAS JAMES HOMES
STANDARD S.F.(LIVING+ ADU + 24) 2619.87 SQ. FT. )
...
..
.
.
....
3 BEDROOMS / 3.5 BATH +
1 BEDROOM / 1 BATH ADU

BUILDING COVERAGE
FIRST FLOOR 1039.59 SQ. FT. GARAGE 437.25 SQ. FT. PORCH 54.50 SQ. FT. LANAI 247.50 SQ. FT. ADU 54.50 SQ. FT. FIREPLACE 8.00 SQ. FT. TOTAL (W/O ADU): 1778.84 SQ. FT.

TOTAL (WITH ADU): 2056.12 SQ. FT.

MAX. BLDG. COVERAGE 1820.00 SQ.FT.
.
.
....
.
.

PROJECT LOCATION
UNIVERSITY DR. MIDDLE AVE.

EXHIBIT A
Page G-1.9
SITE
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH JOB NO.

DATE
A.1

SITE AERIAL & PHOTOS
1 2 3 4

NOT TO SCALE
UNIVERSITY DR.
1 2
4 3
MIDDLE AVE.

Page G-1.10
Feet
0 20 40
College Ave Santa Cruz Ave University Drive
Middle Ave
PREPARED FOR:

THOMAS JAMES HOMES
255 SHORELINE DRIVE, SUITE 428
REDWOOD CITY, CA 94065
877-381-4092

CALIFORNIA MENLO PARK
••
Page G-1.11
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH JOB NO.

DATE
A.3

SITE PLAN

REFER TO LANDSCAPE

SHEETS FOR TREE DETAILS
This Site Plan contains information beyond the scope of work of the Architect. Information provided by Civil Engineer, Landscape Architect, DQG$UERULVWVKDOOEHYHUL¿HGLQWKHLUUHVSHFWLYHGRFXPHQWV 440 UNIVERSITY DR.

FIRST FLOOR 1031.59 SQ. FT.

SECOND FLOOR 1287.00 SQ. FT. TOTAL LIVING 2318.59 SQ. FT. GARAGE 437.25 SQ. FT. ADU 277.28 SQ. FT. PORCH 54.50 SQ. FT. LANAI 247.50 SQ. FT. TOTAL: (LIVING + GARAGE) 2755.84 SQ. FT.

FAL: (LIVING + GARAGE + ADU) 3033.12 SQ. FT. MAX. FAL: 2800.00 SQ. FT.

THOMAS JAMES HOMES
STANDARD S.F.(LIVING+ ADU + 24) 2619.87 SQ. FT. )
...
....
....
3 BEDROOMS / 3.5 BATH +
1 BEDROOM / 1 BATH ADU

BUILDING COVERAGE
FIRST FLOOR 1039.59 SQ. FT. GARAGE 437.25 SQ. FT. PORCH 54.50 SQ. FT. LANAI 247.50 SQ. FT. ADU 54.50 SQ. FT. FIREPLACE 8.00 SQ. FT. TOTAL (W/O ADU): 1778.84 SQ. FT.

TOTAL (WITH ADU): 2056.12 SQ. FT.

MAX. BLDG. COVERAGE 1820.00 SQ.FT.
.
.
.
.
.
.
..
.
4 S.C.D.

DUAL

LOCKING
DOOR
MIN. SETBACK
5'-3"
MIN. SETBACK
5'-3"
MIN. SETBACK
MIN. SETBACK
20'-0"
24'-8"

UNIVERSITY AVENUE
440 UNIVERSITY DR.

FFE = 74.06
SEE CIVIL SHEET GP-1

FOR MORE INFORMATION
LANAI
GARAGE

73.56 73.72

73.72 ELEC.

METER
GA
ME
8'-1 1/2"
22'-2"
21'-8"
T
20'-2"
20'-10"
9'-2 1/2"
5'-4 1/2"
7'-8 1/2" 7' 8 1/2

EXISTING BUILDING

TO BE DEMOLISHED

EXISTING WOOD DECK

TO BE DEMOLISHED

EXISTINGNEIGHBORING

BUILDING

EXISTING

NEIGHBORING

BUILDING

DRIVEWAY

EXISTING

NEIGHBORING

BUILDING
52'-0"
100'-0"
16'-3"
12'-1 1/2" 1 -
(2ND FLR. (2SETBACK) R B
12'-4 1/2"
(2ND FLR. SETBACK) 20'-1
"
20'-1"
0 N

MINSETBACK
2 E
E
/
4 (2
8-
1 E
E
R.
1 SE N. MI
3 0 20'-1
2 2
Y
4 LANAI
5 4 1/2
GA
NG
E
7 4
E
4 G
M
S
/2"
A
M N. SETBAC
MIN. SETBA
3 7' 8 1/2 7






NON-PROTECTED
TREE TO REMAIN, TYP.

TECTED TREES
VE, TYP.


NON-PROTECTED TREE O C
TO REMOVE, TYP. O
NEW 36" WOOD FENCE 6 O FE

NEW WOOD FENCE, W O

SEE LANDSCAPE DWG A S
NEW 36" WOOD FENCE 6

NEW WOOD FENCE, W

SEE LANDSCAPE DWG A

HIGHEST POINT NEAR RIGHT SETBACK FOR

AVERAGE GRADE AT RIGHT SETBACK TO
DETERMINE DAYLIGHT PLANE = 72.58

HIGHEST POINT NEAR LEFT SETBACK FOR STET

AVERAGE GRADE AT LEFT SETBACK TO GE E
DETERMINE DAYLIGHT PLANE= 72.52 RM A

LOWEST POINT NEAR LEFT SETBACK FOR

AVERAGE GRADE AT LEFT SETBACK TO
DETERMINE DAYLIGHT PLANE= 72.40 NE 2.40

LOWEST POINT NEAR RIGHT SETBACK FOR

AVERAGE GRADE AT RIGHT SETBACK TO
DETERMINE DAYLIGHT PLANE = 72.24

HIGHEST POINT UNDER BUILDING FOR S U

AVERAGE NATURAL GRADE TO DETERMINE A AL
BUILDING HEIGHT = 72.63
GA

PROPERTY LINE P P Y
NEW AC EQUIPMENT NOT TO EXCEED 60 dBA E 0DURING THE DAY AND 50 dBA AT NIGHT NEW AC EQUIPMENT NOT TO EXCEED 60 dBA
DURING THE DAY AND 50 dBA AT NIGHT

LOWEST POINT UNDER BUILDING FOR

AVERAGE NATURAL GRADE TO
TERMINE BUILDING HEIGHT = 72.59
B
20'-0"
V
T
8'-6"
16'-6"

ADU PAR ADU PARKING
SPACE

LANDING AT GRADE - FOR N
HANDSCAPE, S.L.D. N
;
;
; ;
;

NON-PROTECTED TREE
NON-PROTECTED TREE TO REMOVE, TYP.

TO REMOVE, TYP.

NON-PROTECTED TREE
TO REMOVE, TYP.
;

NON-PROTECTED TREES
TO REMOVE, TYP.
;
;

NON-PROTECTED TREE
TO REMOVE, TYP.

NON-PROTECTED TREE
TO REMOVE, TYP.
;
Page G-1.12
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH JOB NO.

DATE
A.4

FIRST FLOOR PLAN

FIRST FLOOR PLAN
SCALE: 1/4" = 1'-0"
WH
AC
UP

DROP ZONE OP R D
12'-2" 6'-4" 20'-0"
16'-6" 18'-2"
15'-0" 42'-0"
23'-11 1/2"
38'-6"
34'-8"
59'-0"
30'-6 1/2"
2' 8" 3'-3"
AV CLO. AV

SLOPED CLG P D
5'-4" x 13'-1"
FOYER
10'-1" CLG
16'-11" x 12'-1"
DINING
10'-1" CLG
16'-6" x 15'-0"
LANAI
20'-1" x 20'-1"
GARAGE
10'-1" CLG ABV. T.O.SLAB @ HOUSE
5'-6" x 4'-10"
PWDR
9'-1" CLG 9'-1" CLG
1" x 12'-7"

KITCHEN
0'-1" CLG
16'-11" x 14'-7"

GREAT ROOM
10'-1" CLG
4'-8" x 4'-10"
PANTRY
9'-1" CLG 9'-1" CLG
"

VENT F/P/

THRU WALL

TO OUTSIDE
AC
19 R @ 7.14"
17 T @ 10.5"
2'-6"
5'-4" x 7'-0"
PORCH
10'-1" CLG
G
3 U
1'-6"6"
4" MIN.

S.C.D.

A
A.9
B
A.9
DUALLOCKINGDOOR 20'-1"
20'-0 1/2"

SECOND FLOOR PLAN
SCALE: 1/4" = 1'-0"
DN 19 R @ 7.14" 17 T @ 10.5"
10'-4" x 13'-3"

PRIMARY BATH
8'-7" CLG
5'-8" x 8'-3"

LAUNDRY
8'-7" CLG
11'-7" x 5'-0"
BA 2
8'-7" CLG
10'-1" x 12'-1"
LOFT
8'-7" CLG
17'-3" x 14'-4"

PRIMARY

BEDROOM
8'-7" CLG
11'-0" x 11'-3"
BEDROOM 3
8'-7" CLG
11'-8" x 12'-3"
BEDROOM 2
8'-7" CLG
10'-4" x 7'-1"
W.I.C.
8'-7" CLG
53'-0"
15'-2 1/2"34'-10"
16'-6" 18'-2"
34'-8"
18'-0"20'-0"15'-0"
53'-0"
4'-0" 13'-11 1/2" 13'-6 1/2" 3'-2"
34'-8"
2'-11 1/2"
B
A.9
A
A.9
440 UNIVERSITY DR.
1031.59 SQ. FT.

SECOND FLOOR 1287.00 SQ. FT. TOTAL LIVING 2318.59 SQ. FT. GARAGE 437.25 SQ. FT. ADU 277.28 SQ. FT. PORCH 54.50 SQ. FT. LANAI 247.50 SQ. FT. TOTAL: (LIVING + GARAGE) 2755.84 SQ. FT. FAL: (LIVING + GARAGE + ADU) 3033.12 SQ. FT. MAX. FAL: 2800.00 SQ. FT.

THOMAS JAMES HOMES
STANDARD S.F.(LIVING+ ADU + 24) 2619.87 SQ. FT. )
...
....
....
3 BEDROOMS / 3.5 BATH +
1 BEDROOM / 1 BATH ADU

BUILDING COVERAGE
FIRST FLOOR 1039.59 SQ. FT. GARAGE 437.25 SQ. FT. PORCH 54.50 SQ. FT. LANAI 247.50 SQ. FT. ADU 54.50 SQ. FT. FIREPLACE 8.00 SQ. FT. TOTAL (W/O ADU): 1778.84 SQ. FT.

TOTAL (WITH ADU): 2056.12 SQ. FT.

MAX. BLDG. COVERAGE 1820.00 SQ.FT.
.
.
.
.
.
.
..
.

Page G-1.13
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH JOB NO.

DATE
A.5

ROOF PLAN
SCALE: 1/4" = 1'-0"
B
A.9
A
A.9
10 1/2"

ROOF PLAN

ALL ROOFING MATERIAL IS COMPOSITION
SHINGLE UNLESS OTHERWISE NOTED.

POTENTIAL SOLAR ZONE
RIDGE
RIDGE
RIDGE
RIDGE
HIP
HIP
HIP
HIP
HIP
HIP
HIP
HIP
HIP
HIP
HIP
VALLEY
VALLEY
VALLEY
VALLEY
1’-0” EAVE TYP.
1’-0” EAVE TYP.
1’-0” RAKE
TYP.
6” RAKE
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
**

SETBACK LINE

SETBACK LINE
VALLEY
** AS PER MENLO PARK GUIDELINES,
18” INTRUSION OF ARCHITECTURAL

FEATURES, SUCH AS EAVES, IS

ALLOWABLE INTO ANY YARD OF
LESS THAN 10’. 3’ INTRUSION OF

ARCHITECTURAL FEATURES, SUCH

AS EAVES, IS ALLOWABLE INTO ANY
YARD OF 10’ OR GREATER.

Page G-1.14
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH JOB NO.

DATE
A.6

FLOOR AREA DIAGRAMS
20'-7" x 16'-0"
G1
12'-2" x 22'-6"
ADU 1
12'-2" x 19'-7"
A
4'-4" x 19'-0"
B
18'-2" x 34'-0"
C
3'-10" x 3'-6"
G3
5'-10" x 16'-0"
D
16'-6" x 15'-0"
LANAI
5'-4" x 4'-6"
PORCH 1 PO
5'-10" x 2'-6"
PORCH 2
7'-4" x 2'-0"
81'-" 8'-1" x 6" PORCH 3
ADU 2
21'-0" x 4'-6"
G2

FIRST FLOOR AREA DIAGRAM
SCALE: 1/4" = 1'-0"
16 x 5'-4"
P
5 16'-6" x 12'-7"
A
12'-6" x 4'-1"
B
14'-0" x 14'-5"
C
18'-2" x 15'-3"
D
15'-0" x 19'-4"
E
15'-0" x 4'-1"
F
13'-7" x 11'-6"
G
7'-4" x 3'-6"
H
4'-8" x 3'-6"
I

SECOND FLOOR AREA DIAGRAM
SCALE: 1/4" = 1'-0"

FIRST FLOOR AREA
A 238.26 SQ. FT. 12'-2" X 19'-7"
B 82.33 SQ. FT. 4'-4" X 19'-0"
C 617.67 SQ. FT. 18'-2" X 34'-0"
D 93.33 SQ. FT. 5'-10" X 16'-0"
TOTAL 1031.59 SQ. FT.

GARAGE
G1 329.33 SQ. FT. 20'-7" X 16'-0"
G2 94.50 SQ. FT. 21'-0" X 4'-6"G3 13.42 SQ. FT. 3'-10" X 3'-6" TOTAL 437.25 SQ. FT.

ADU
ADU 1 273.24 SQ. FT. 12'-2" X 22'-6"ADU 2 4.04 SQ. FT. 8'-1" X 6" TOTAL 277.28 SQ. FT.

PORCH
PORCH 1 24.00 SQ. FT. 5'-4" X 4'-6"PORCH 2 15.83 SQ. FT. 5'-10" X 2'-6"PORCH 3 14.67 SQ. FT. 7'-4" X 2'-0" TOTAL 54.50 SQ. FT.

SECOND FLOOR AREA
A 207.63 SQ. FT. 16'-6" X 12'-7"B 51.04 SQ. FT. 12'-6" X 4'-1" C 201.83 SQ. FT. 14'-0" X 14'-5"
D 277.04 SQ. FT. 18'-2" X 15'-3"
E 290.00 SQ. FT. 15'-0" X 19'-4"
F 61.25 SQ. FT. 15'-0" X 4'-1"
G 156.21 SQ. FT. 13'-7" X 11'-6"
H 25.67 SQ. FT. 7'-4" X 3'-6"
I 16.33 SQ. FT. 4'-8" X 3'-6"
TOTAL 1287.00 SQ. FT.

FLOOR AREA LIMIT
FIRST FLOOR 1031.59 SQ. FT.

SECOND FLOOR 1287.00 SQ. FT.

GARAGE 437.25 SQ. FT. ADU 277.28 SQ. FT. TOTAL 3033.12 SQ. FT.

LIVING + GARAGE 2755.84 SQ. FT.

MAX. F.A.L. 2800.00 SQ. FT.

BUILDING COVERAGE
FIRST FLOOR 1031.59 SQ. FT. LANAI 247.50 SQ. FT. 16'-6" X 15'-0" PORCH 54.50 SQ. FT. GARAGE 437.25 SQ. FT. ADU 277.28 SQ. FT. FIREPLACE 8.00 SQ. FT. 1'-6" X 5'-4" TOTAL 2056.12 SQ. FT.TOTAL W/O ADU 1778.84 SQ. FT.MAX. BUILDING COVERAGE 1820.00 SQ. FT. C
..
.
..
.
.
..
..
.
.
.
.
..
..
.
.
....
.
.
...
.
.
..
...
..
..
"
"
""
"
""
""
"
"
"
"
"
"""
"
"
""
"
"
Page G-1.15
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH JOB NO.

DATE
A.7
12 4 12 4
12 4
12 4
FX
T.O.P.

T.O.S.F.

T.O.S./T.O.C.

T.O.WDW.

T.O.P.

T.O.WDW.
8'-0"1
0'-1"
1'-2 3/4"
8'-7"
7'-6"
+/- 26'-3 1/2"
T.O.P.

T.O.S.F.

T.O.S./T.O.C.

T.O.WDW.

T.O.P.

T.O.WDW.
8'-0
1"0'-1"
1'-2 3/4"
8'-7"
7'-6"

FRONT ELEVATION
SCALE: 1/4" = 1'-0"
DAYLIGHT PLANE (28'-0" MAX. HT.)
F.F.E.= 74.06 F.F.E.= 74.06

AVERAGE
GRADE= +/- 72.61
28'-0"

FROM AVERAGE GRADE
19'-6"

FROM AVERAGE GRADE AT SETBACK
45°
5'-3"

TO PROPERTY LINE T
5'-3"

TO PROPERTY LINE

AVERAGE

GRADE AT RIGHT
SETBACK= +/- 72.41

AVERAGE

GRADE AT LEFT
SETBACK= +/- 72.46
19'-6"
45°
2'-6"
3'-0"
3'-0"
1'-0"
1'-0"
6"
12 4
12 4
T.O.P.

T.O.S.F.

T.O.S./T.O.C.
7'-6"8'-0"
T.O.WDW.

T.O.P.

T.O.WDW.

T.O.P.

T.O.S.F.

T.O.S./T.O.C.
1'-2 3/4"
7'-6"
8'-7"
8'-0"
10'-1"
T.O.WDW.

T.O.P.

T.O.WDW.
1'-2 3/4"
8'-7" 10'-1"
+/- 26'-3 1/2"

RIGHT ELEVATION
SCALE: 1/4" 1' 0" 1/4" = 1'-0"
12 4
12 4
12 4

TBD TO FENCE LINE
FX
12 4
FX
F.F.E.= 74.06 F.F.E.= 74.06
AVERAGE GRADE= +/- 72.61
4'-0"
4'-0"
4'-0"
3'-6"
3'-6"
3'-6"
3'-6"

ELEVATIONS

ACCENT MATERIAL BRICK VENEERROOF MATERIAL COMPOSITION SHINGLE ROOFROOF MATERIALCOMPOSITION SHINGLE ROOF

BODY COLORWOOD FASCIA TRIMBODY COLOR CEMENTITIOUS HORIZONTAL SIDINGBODY COLOR CEMENTITIOUS HORIZONTAL SIDING ACCENT COLOR FIBERGLASS FRONT DOORWOOD COLUMN & TRIMBODY COLOR CEMENTITIOUS WINDOW & DOOR TRIMWOOD BAY WINDOW STEEL GARAGE DOORBODY COLORCEMENTITIOUS WINDOW & DOOR TRIMACCENT COLOR WOOD PORCH COLUMN 10 1/2”
**
WINDOWSMARVIN ESSENTIAL ALL ULTREX WINDOWS TYP. - NO SIMULATED DIVIDED LITE ** AS PER MENLO PARK GUIDELINES,
18” INTRUSION OF ARCHITECTURAL

FEATURES, SUCH AS EAVES, IS

ALLOWABLE INTO ANY YARD OF
LESS THAN 10’. 3’ INTRUSION OF

ARCHITECTURAL FEATURES, SUCH

AS EAVES, IS ALLOWABLE INTO ANY
YARD OF 10’ OR GREATER.

Page G-1.16
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH JOB NO.

DATE
A.8

ELEVATIONS
WINDOWSMARVIN ESSENTIAL ALL ULTREX WINDOWS TYP. - NO SIMULATED DIVIDED LITE FX
12 4
T.O.P.

T.O.S.F.

T.O.S./T.O.C.

T.O.WDW.

T.O.P.

T.O.WDW.
8'-0"1
0'-1"
7'-6"
8'-7"
1'-2 3/4"
T.O.P.

T.O.S.F.

T.O.S./T.O.C.

T.O.WDW.

T.O.P.

T.O.WDW.
8'-0"1
0'-1"
7'-6"
8'-7"
1'-2 3/4"
+/- 26'-3 1/2"

LEFT ELEVATION
SCALE: 1/4" = 1'-0"
14'-4 1/2"
T.O.WDW.
12 4
FX FX
D
12 4
12 4
F.F.E.= 74.06 F.F.E.= 74.06
FX FX
AVERAGE GRADE= +/- 72.61
12 4
3'-0" 3'-0"
6'-6"
3'-0"
3'-0"
"
T.O.STAIRLANDING
3'-6"
3'-6"
3'-6"
3'-6"
3'-6"
3'-0"
6'-0"
3'-6"
T.O.P.

T.O.S.F.

T.O.S./T.O.C.
1'-2 3/4"
7'-6"
48'-7"
8'-0"
10'-1"
T.O.WDW.

T.O.P.

T.O.WDW.

T.O.P.

T.O.S.F.

T.O.S./T.O.C.
1'-2 3/4"
7'-6" 8'-7"8'-0"
10'-1"
T.O.WDW.

T.O.P.

T.O.WDW.
12 4
12 4

REAR ELEVATION
SCALE: 1/4" = 1'-0"
12 4
12 4
12 4
DAYLIGHT PLANE (28'-0" MAX. HT.)
F.F.E.= 74.06 F.F.E.= 74.06

AVERAGE
GRADE= +/- 72.61

AVERAGE

GRADE AT RIGHT
SETBACK= +/- 72.41

AVERAGE

GRADE AT LEFT
SETBACK= +/- 72.46
5'-3"

TO PROPERTY LINE
5'-3"

TO PROPERTY LINE
19'-6"

FROM AVERAGE GRADE AT SETBACK
19'-6"

FROM AVERAGE GRADE AT SETBACK
+/- 26'-3 1/2"
28'-0"

FROM AVERAGE GRADE
45°
3'-0"
3'-0"
45°
3'-0"
3'-6"
3'-6"
6"
1'-0"

ROOF MATERIAL COMPOSITION SHINGLE ROOFROOF MATERIALCOMPOSITION SHINGLE ROOF

BODY COLORWOOD FASCIA TRIMBODY COLOR CEMENTITIOUS HORIZONTAL SIDING BODY COLOR CEMENTITIOUS HORIZONTAL SIDING BODY COLORCEMENTITIOUS WINDOW & DOOR TRIMBODY COLORCEMENTITIOUS WINDOW & DOOR TRIMACCENT COLOR WOOD TRELLIS & WOOD POST ** AS PER MENLO PARK GUIDELINES,
18” INTRUSION OF ARCHITECTURAL

FEATURES, SUCH AS EAVES, IS

ALLOWABLE INTO ANY YARD OF
LESS THAN 10’. 3’ INTRUSION OF

ARCHITECTURAL FEATURES, SUCH

AS EAVES, IS ALLOWABLE INTO ANY
YARD OF 10’ OR GREATER.
10 1/2”
**
Page G-1.17
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH JOB NO.

DATE
A.9

SECTIONS
* AS PER THE MENLO PARK MUNICIPAL
CODE (SECTION 16.04.313 FLOOR AREA)

ATTIC SPACE WHERE THE DISTANCE

BETWEEN THE TOP OF THE CEILING

JOIST AND THE BOTTOM OF THE ROOF

SHEATHING MEASURES LESS THAN
FIVE FEET (5’) IS EXCLUDED FROM THE
FLOOR AREA.
** AS PER MENLO PARK GUIDELINES,
18” INTRUSION OF ARCHITECTURAL

FEATURES, SUCH AS EAVES, IS

ALLOWABLE INTO ANY YARD OF
LESS THAN 10’. 3’ INTRUSION OF

ARCHITECTURAL FEATURES, SUCH

AS EAVES, IS ALLOWABLE INTO ANY
YARD OF 10’ OR GREATER.

DROP ZONE
DINING PWDR. PANTRY
9'-1"
6'-8" CLEAR.
14'-4 1/2"
3'-6"

LOFT PRIMARY
W.I.C.

SECTION A - A
SCALE: 1/4" = 1'-0"
T.O.P.

T.O.S.F.

T.O.S./T.O.C.

T.O.WDW.

T.O.P.

T.O.WDW.
8'-0"1
0'-1"
1'-2 3/4"
OP
8'-7"
7'-6"
+/- 26'-3 1/2"
T.O.P.

T.O.S.F.

T.O.S./T.O.C.

T.O.WDW.

T.O.P.

T.O.WDW.
8'-0"1
0'-1"
1'-2 3/4"
8'-7"
7'-6"
DAYLIGHT PLANE (28'-0" MAX. HT.)
F.F.E.= 74.06 F.F.E.= 74.06

AVERAGE
GRADE= +/- 72.61
28'-0"

FROM AVERAGE GRADE
19'-6"

FROM AVERAGE GRADE AT SETBACK
45°
5'-3"

TO PROPERTY LINE
5'-3"

TO PROPERTY LINE

AVERAGE

GRADE AT RIGHT
SETBACK= +/- 72.41

AVERAGE

GRADE AT LEFT
SETBACK= +/- 72.46
19'-6"

FROM AVERAGE GRADE AT SETBACK
45°
4'-7"
3'-4"
3'-6"
8'-7"
6'-8"
T.O.DOOR
T.O.P.

T.O.S.F.

T.O.P.

T.O.SLAB/T.O.C.

T.O.WDW.

T.O.WDW.

F.F.E.= 74.06
GREAT
BEDROOM 3 W.I.C. PRIMARY PRIMARY BEDROOM
BATH
SLOPE
2" 4"

SECTION B-B
SCALE: 1/4" = 1'-0"
GARAGE
ROOM

PANTRY KITCHEN
8'-0" 7'-
8 6"
'-7"10'-1" 1'-2 3/4"T.O.S.F.

T.O.WDW.

T.O.WDW.
8'-0" 7'-6"
T.O.SLAB/T.O.C.F.F.E.= 74.06
8'-7"10'-1" 1'-2 3/4"
T.O.P.

T.O.P.
26'-3 1/2"
9'-1"
FX FX

AVERAGE
GRADE= +/- 72.61
4'-7 1/2"
2'-6 1/2" 2'
10'-5"
8'-7"
6'-8"
T.O.DOOR
*
*
*
*
Page G-1.18
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH JOB NO.

DATE
A.10

COLORS & MATERIALS

BODY COLOR HORIZONTAL SIDING, WINDOW & DOOR TRIM

ACCENT COLOR

FRONT DOOR, FRONT PORCH COLUMN &

ACCENT MATERIALBRICK VENEER
TRIM

BAY WINDOWS, PANELLING, EAVES, FASCIA, GARAGE DOOR, BACK TRELLIS

ROOF MATERIAL COMPOSITION SHINGLE
Page G-1.19
440 UNIVERSITY DRIVE
MENLO PARK, CALIFORNIA 94025

09.09.22 D28 M200 A

TRADITIONAL

KRISTIN LASKY
DAHLIN
This is an example of design specifications for this particular plan and elevation. Detailed specifications, finishes and fixtures are subject to change, on homes prior to sale, at any time without notice or obligation. Square footages and lot dimensions are approximate and may vary in construction and depending on the standard of measurement used, engineering and municipal requirements, or other site-specific conditions. Room size, walls, windows, doors, porches and balconies vary per home elevation and location. Not an offer or solicitation to sell real property. Thomas James Homes is a registered trademark of Thomas James Homes, LLC.©2018 Thomas James Homes. All rights reserved. CA DRE License #02057367 NOTE: RENDERINGS SHOWN

ARE FOR ILLUSTRATION

PURPOSES ONLY AND ARE NOT

INTENDED TO BE AN ACTUAL

DEPICTION OF THE HOME OR
IT’S SURROUNDINGS

EXTERIOR RENDERINGS
(NOT TO SCALE)

HOUSE NUMBERS
TRICORN BLACKSW 6258R FRONT DOORR GARAGE DOOR
WINDOW FRAMES: BLACK

ELDORADO STONETUNDRA BRICK - CHALK DUST

GARAGE DOOR

CLOPAY GRAND HARBOR
DESIGN 11, INSULATED
SOLID TOP 11

EXTERIOR LIGHT FIXTURE
8”W X 15.25”H

FENCE STAIN

SEMI-TRANSPARENT

SPANISH MOSS

GAF ROOF SHINGLESCHARCOAL

FRONT DOOR

MASONITE - HERITAGE - WINSLOW

FIBERGLASS
1/4 LITE 2 PANEL DOOR

FULL SIDELITE
PURE WHITESW 7OO5R SIDINGR WINDOW & DOOR TRIMR PANELING, COLUMNS, & TRIMR FASCIA, EAVES, & CORBELSR BACK TRELLIS Page G-1.20
64x60
HH: 80
36x52
HH: 80
48x52
HH: 80
36x52
HH: 80
36x52
HH: 80
18x18
HH: 80
36x52
HH: 80
60x46
HH: 80
36x36
HH: 82
36x52
HH: 80

LIVING ROOM
8'-0" CLG

KITCHEN
8-0" CLG

BEDROOM
8'-0" CLG

BEDROOM
8'-0" CLG
GARAGE
8'-0" CLG LOW
DN
18"
DECK

EXPOSED STUDS
DRYWALL (TYP.)
DRYWALL (TYP.)
DRYWALL (TYP.)
13'-3" 1'-11" 5'-5" 1'-11" 11'-5"
12'-1" 12'-4"
8'-2"
24'-8" 8'-4"
11'-6"
21'-5"
DRYWALL (TYP.)
TILE
DRYWALL (TYP.)

STONE FIREPLACE / HEARTH
DRYWALL (TYP.) WOOD FLOORING
8'-0" CLG
8'-0" CLG
8'-0" CLG
8'-0"
CLG
8'-0" CLG
PORCH
DRYWALL (TYP.)
SCALE

PROJECT

APPROVED BY
DATE
SHEET

PREPARED FORPROJECT NAMEPLAN TYPEPROJECT ADDRESS

WORRY FREE

RENOVATIONS
3626 E. PACIFIC COAST
HIGHWAY | 2ND FLOORLONG BEACH CA | 90804
T 562.621.9100
F 888.698.2966
WWW.PPMCO.NET

PRECISION PROPERTYMEASUREMENTS

FLOOR PLAN
3385_BA
06/14/22

THOMAS JAMES
HOMES
440 UNIVERSITY
DRIVE

RESIDENCE
440 UNIVERSITY DRIVE,
MENLO PARK, CA 94025
of 3
All plans created by Precision Property
Measurement Ltd "PPM" are made exclusively
for landscaping purposes (Cal. Bus. & Prof.

Code §8727). All site plans created by PPM do not
involve the determination of any property line, and as
such do not constitute land surveying
(Cal. Bus. & Prof. Code §§8726-8727). In
addition, PPM services and plans do not constitute
civil engineering (Cal. Bus. & Prof. Code §§6702-6704), and thus should not be used for any studies or activities defined as civil engineering (Cal. Bus. & Prof. Code
§6731). All floor plans created by PPM are intended to
be used as a reference for design and construction and
should not be considered a substitute for the services of a licensed structural engineer or licensed architect. PPM makes every reasonable effort to ensure the accuracy of the information found in our plans. However, every
As-Built drawing inherently contains errors to some
degree. It is the duty of the architect, contractor,
designer or other licensed professional, as a consultant to the property owner, to determine the suitability of the As-Built plans prior to construction. Measurements should be field confirmed before commencing construction. in the event that an error is found on a plan, PPM's liability is limited to the amount of the fee paid to PPM.

JS
1 TWH
PV
WH = WATER HEATER
FURN

LOW CASEWORKFULL HEIGHT CASEWORKUPPER CASEWORK
CLG
HH
= CEILING HEIGHT= HEADER HEIGHT= GAS METER= WALL HEATER= TRASH COMPACTOR= DISH WASHER= OVEN= REFRIGERATOR= RANGE= DRYER= WASHER= WASHER/DRYER COMBO= ELECTRIC METER W/D
W
D
REFR
OVEN
DW
TC
= FURNACE= ELECTRICAL PANEL= SOLAR COMPONENTS= TANKLESS WATER HEATER= FLOOR DRAIN WS = WATER SOFTNER
1/4" = 1'-0"
Page G-1.21

EXISTING

1.4:12

EXISTING
3:12

EXISTING
5:12

EXISTING
5:12 EXISTING
5:12

EXISTING
5:12

EXISTING
5:12

EXISTING
5:12

EXISTING
5:12

EXISTING
5:12

EXISTING
5:12

EXISTING
5:12

EXISTING
5:12
SCALE

PROJECT

APPROVED BY
DATE
SHEET

PREPARED FORPROJECT NAMEPLAN TYPEPROJECT ADDRESS

WORRY FREE

RENOVATIONS
3626 E. PACIFIC COAST
HIGHWAY | 2ND FLOORLONG BEACH CA | 90804
T 562.621.9100
F 888.698.2966
WWW.PPMCO.NET

PRECISION PROPERTYMEASUREMENTS

ROOF PLAN
3385_BA
06/14/22

THOMAS JAMES
HOMES
440 UNIVERSITY
DRIVE

RESIDENCE
440 UNIVERSITY DRIVE,
MENLO PARK, CA 94025
of 3
All plans created by Precision Property
Measurement Ltd "PPM" are made exclusively
for landscaping purposes (Cal. Bus. & Prof.

Code §8727). All site plans created by PPM do not
involve the determination of any property line, and as
such do not constitute land surveying
(Cal. Bus. & Prof. Code §§8726-8727). In
addition, PPM services and plans do not constitute
civil engineering (Cal. Bus. & Prof. Code §§6702-6704), and thus should not be used for any studies or activities defined as civil engineering (Cal. Bus. & Prof. Code
§6731). All floor plans created by PPM are intended to
be used as a reference for design and construction and
should not be considered a substitute for the services of a licensed structural engineer or licensed architect. PPM makes every reasonable effort to ensure the accuracy of the information found in our plans. However, every
As-Built drawing inherently contains errors to some
degree. It is the duty of the architect, contractor,
designer or other licensed professional, as a consultant to the property owner, to determine the suitability of the As-Built plans prior to construction. Measurements should be field confirmed before commencing construction. in the event that an error is found on a plan, PPM's liability is limited to the amount of the fee paid to PPM.

JS
2 RTU

CHIMNEY OUTLINE

BUILDING FOOTPRINT
= AIR CONDITIONER= UTILITY BOX= ROOF DRAIN= ROOF VENT= ROOF TOP UNIT= ROOF TOP HATCH= DOWNSPOUT 1/4" = 1'-0"
Page G-1.22

NORTHEAST

NORTHWEST SOUTHWEST

SOUTHEAST

SHINGLES
(TYP)
12 5
12 3
12 1.4
12 5 12
5 12

1.4 12
3 12
5 8'-0" 7'-5"
1ST FLOOR
F.F.E.

BEDROOM
F.C.E.

MAJOR
RIDGE
15'-5"
8'-0"
16'-11"
GARAGE
F.F.E.

GARAGE
F.C.E.

MAJOR
RIDGE
8'-11"
12 5

BRICK (TYP)

WOOD SIDING
(TYP)

SHINGLES
(TYP)

BRICK (TYP)

WOOD SIDING
(TYP)

WOOD SIDING
(TYP)

BRICK (TYP)

SHINGLES
(TYP)

BRICK (TYP)

WOOD SIDING
(TYP)

WOOD DECK
(TYP)

SHINGLES
(TYP)

NATURAL STONE FINISH
(TYP)

WOOD DECK
(TYP)

NATURAL STONE FINISH
(TYP)
SCALE

PROJECT

APPROVED BY
DATE
SHEET

PREPARED FORPROJECT NAMEPLAN TYPEPROJECT ADDRESS

WORRY FREE

RENOVATIONS
3626 E. PACIFIC COAST
HIGHWAY | 2ND FLOORLONG BEACH CA | 90804
T 562.621.9100
F 888.698.2966
WWW.PPMCO.NET

PRECISION PROPERTYMEASUREMENTS

EXTERIOR

ELEVATIONS
3385_BA
06/14/22

THOMAS JAMES
HOMES
440 UNIVERSITY
DRIVE

RESIDENCE
440 UNIVERSITY DRIVE,
MENLO PARK, CA 94025
of 3
All plans created by Precision Property
Measurement Ltd "PPM" are made exclusively
for landscaping purposes (Cal. Bus. & Prof.

Code §8727). All site plans created by PPM do not
involve the determination of any property line, and as
such do not constitute land surveying
(Cal. Bus. & Prof. Code §§8726-8727). In
addition, PPM services and plans do not constitute
civil engineering (Cal. Bus. & Prof. Code §§6702-6704), and thus should not be used for any studies or activities defined as civil engineering (Cal. Bus. & Prof. Code
§6731). All floor plans created by PPM are intended to
be used as a reference for design and construction and
should not be considered a substitute for the services of a licensed structural engineer or licensed architect. PPM makes every reasonable effort to ensure the accuracy of the information found in our plans. However, every
As-Built drawing inherently contains errors to some
degree. It is the duty of the architect, contractor,
designer or other licensed professional, as a consultant to the property owner, to determine the suitability of the As-Built plans prior to construction. Measurements should be field confirmed before commencing construction. in the event that an error is found on a plan, PPM's liability is limited to the amount of the fee paid to PPM.

JS
3 FINISHED GRADE LINEFINISHED FLOOR LINEROOF PITCH LABEL (RISE/RUN) X
12 1/4" = 1'-0"
Page G-1.23
Feet
0 10 20
College Ave Santa Cruz Ave University Drive
Middle Ave
PREPARED FOR:

THOMAS JAMES HOMES
255 SHORELINE DRIVE, SUITE 428
REDWOOD CITY, CA 94065
877-381-4092

CALIFORNIA MENLO PARK
••
11/11/2022
Page G-1.24
Page G-1.25
Page G-1.26
Page G-1.27
Page G-1.28
Page G-1.29
Page G-1.30

THOMAS JAMES HOMES
255 Shoreline Dr Suite 428,
Redwood City, CA 94065
440 University Drive
Project Description
November 11, 2022
PARCEL GENERAL INFORMATION
The parcel located at 440 University Drive is a substandard lot, which is the reason a Use Permit is required for the proposed two‐story residence. The R‐1‐U zoning ordinance requires a minimum of 7,000 sq ft in area, 65 ft in width and 100ft in depth. The depth complies with the zoning ordinance; however, the lot area of 5200sf and width of 52ft is less than the required.

There are 22 trees analyzed including 6 Heritage trees and 2 non protected trees offsite and 14 non protected trees onsite. 8 of the 14 non protected trees are proposed to be removed. 5 new trees are proposed onsite: 1‐36” Box Chitalpa at the front; 1‐ 24” Box Crape Myrtle and 1‐ 24” Box Western Redbud at the rear; and 2‐24”box Japanese Zelkovas at the left side. Tree protection will be provided for the trees to remain during construction through fencing as well as construction methods to save the trees from being impacted.

EXISTING HOME TO BE DEMOLISHED
The existing house is a one story single‐family minimal traditional home built in 1940. The home is 1130sf including a 260sf garage.

PROPOSED SINGLE FAMILY RESIDENCE
The parcel’s block typically consists of homes facing either College Avenue or Middle Avenue. The corner lots have been merged with their adjacent lots and then subdivided into 3 parcels that are reoriented to face the cross‐street of University Drive. The parcels maintain a 50ft width yet are smaller in depth in comparison to the original lots. The homes on these parcels have L shaped footprints to create private rear outdoor spaces. In the immediate context along University Drive, the neighborhood consists of both 2‐story and 1‐story residences of varying styles including Traditional, Transitional, and Spanish. Main design features include horizontal siding, stucco, brick/stone accents, gable/shed roofs of either metal, comp shingle or S‐tile materials, decorative shutters, and bay windows. Porches with columns define some of the entries creating inviting front elevations. Multiple 2‐car garage configurations are found including recessed, side facing and front facing.

Continuing the 2‐story evolvement and using the patterns and aesthetics found in the neighborhood, the new home proposed is a 2‐story single family Traditional style residence featuring 3beds/3.5 baths and a 1bed/1bath attached ADU to appeal to families. A combination of horizonal siding and brick are used on the first floor with a smooth panel bay window treatment at the front living space.

Square columns and a gable roof form distinguishes the front porch and offers a more traditional aesthetic. The second‐floor massing steps back from the first story to reduce appearance from the street and provide relief along the right and left edges. A front gable provides interest and echoes the surrounding gable/shed roof forms in the neighborhood. A front facing 2‐car garage and 2 off street EXHIBIT B Page G-1.31

THOMAS JAMES HOMES
255 Shoreline Dr Suite 428,
Redwood City, CA 94065
parking spaces are provided. The garage is slightly setback from the main living space to be less prominent. The footprint of the home aligns with the adjacent homes as it uses a similar L shape form stepping back on the left side to create usable private yard space.

A light color palette is proposed to blend well with the neighborhood using an off white for the horizontal siding and a matching brick to provide a warm texture change. Minimalist windows with black window frames compliment the dark accent color for the garage, front door and shingle roof.

NEIGHBOR RELATIONS
Thomas James Homes has reached out to neighbors within 300‐ft. of this property with a copy of the site plan, floor plan, elevations and a letter addressing our project. A virtual neighbor meeting was held on October 5, 2022 to collect feedback from the immediate neighbors. In addition to mailing notices, we have coordinated with two neighbors who attended the meeting and have reached out with concerns. Please see below for a summary of responses to neighbor concerns.

Neighbor at 444 University (left adjacent neighbor)
Concerns: 1) Requested more information on traffic management during construction and results on the asbestos report for demolition of the existing home. 2) Concerned if there was going to be a sidewalk installed at the property to continue the existing sidewalk.

Response: Thomas James Homes responded to the neighbor via email on 11/3/22 to follow up with requested information regarding traffic management and the asbestos report. We also confirmed the Engineering Department does indeed require a new sidewalk on the property and are proposing that improvement in our plans.

Neighbor at 883 Middle Avenue (Rear neighbor)
Concerns: 1) Interested in selling her home to TJH. 2) Requested more information on allowable fence heights. 3) Concerned the house is too close to the rear of the yard and does not desire the two story home close to the shared property line regardless of the compliant setbacks. The Neighbor claims the home and trees will affect/block solar gain.

Response: Thomas James Homes responded to the neighbor via phone multiple times and an email on 11/3/22 to follow up with requested information and concerns. We confirmed the proposal is well within the allowable setbacks and allowable height per the City municipal code and guidelines. In addition, the proposed home is 78ft from the main home on the 883 property. See the attached thread for email reference.

We look forward to adding to the charm and sense of community in Menlo Park and welcome any questions the City may have as we go through the Use Permit Application process.

Best,
Anna Felver, Planning Manager at Thomas James Homes
[email protected] | 650. 402.3024
Page G-1.32
PAGE: 1 of 2
LOCATION: 440
University Drive
PROJECT NUMBER:

PLN2022-00050
APPLICANT: Thomas
James Homes
OWNER: Thomas James
Homes
PROJECT CONDITIONS:

1. The use permit shall be subject to the following standard conditions:
a. The applicant shall be required to apply for a building permit within one year from the date of approval (by April 4, 2024) for the use permit to remain in effect. b. Development of the project shall be substantially in conformance with the plans prepared by Dahlin Group Architecture consisting of 22 plan sheets, dated received January 19, 2023 and approved by the City Council on April 4, 2023, except as modified by the conditions contained herein, subject to review and approval of the Planning Division. c. Prior to building permit issuance, the applicant shall comply with all Sanitary District, Menlo Park Fire Protection District, and utility companies’ regulations that are directly applicable to the project.
d. Prior to building permit issuance, the applicant shall comply with all requirements of the Building Division, Engineering Division, and Transportation Division that are directly applicable to the project.
e. Prior to building permit issuance, the applicant shall submit a plan for any new utility installations or upgrades for review and approval by the Planning, Engineering and Building Divisions. All utility equipment that is installed outside of a building and that cannot be placed underground shall be properly screened by landscaping. The plan shall show exact locations of all meters, back flow prevention devices, transformers, junction boxes, relay boxes, and other equipment boxes.
f. Simultaneous with the submittal of a complete building permit application, the applicant shall submit plans indicating that the applicant shall remove and replace any damaged and significantly worn sections of frontage improvements. The plans shall be submitted for review and approval of the Engineering Division.
g. Simultaneous with the submittal of a complete building permit application, the applicant shall submit a Grading and Drainage Plan for review and approval of the Engineering Division. The Grading and Drainage Plan shall be approved prior to the issuance of grading, demolition or building permits.
h. Heritage trees in the vicinity of the construction project shall be protected pursuant to the Heritage Tree Ordinance and the arborist report prepared by California Tree and Landscape Consulting, Inc. dated August 30, 2022.
i. Prior to building permit issuance, the applicant shall pay all fees incurred through staff time spent reviewing the application.
j. The applicant or permittee shall defend, indemnify, and hold harmless the City of Menlo Park or its agents, officers, and employees from any claim, action, or proceeding against the City of Menlo Park or its agents, officers, or employees to attack, set aside, void, or annul an approval of the Planning Commission, City Council, Community Development Director, or any other department, committee, or agency of the City concerning a development, variance, permit, or land use approval which action is brought within the time period provided for in any applicable statute; provided, however, that the applicant’s or permittee’s duty to so defend, indemnify, and hold harmless shall be subject to the City’s promptly notifying the applicant or permittee of any said claim, action, or proceeding and the City’s full cooperation in the applicant’s or permittee’s defense of said claims, actions, or proceedings.

2. The use permit shall be subject to the following project-specific conditions:

EXHIBIT C Page G-1.33
PAGE: 2 of 2
LOCATION: 440
University Drive
PROJECT NUMBER:

PLN2022-00050
APPLICANT: Thomas
James Homes
OWNER: Thomas James
Homes
a. Simultaneous with the submittal of a complete building permit application, the Applicant shall revise the elevation drawings to indicate the stair well window will have obscured glass, subject to review and approval of the Planning Division.

Page G-1.34
City of Menlo Park
440 UNIVERSITY DRIVE
Location Map
Scale: 1:4,000 Drawn By: CRT Checked By: DMC Date: 4/4/2023 Sheet: 1

ATTACHMENT B
Page G-1.35
1 PLANNING COMMISSION RESOLUTION NO. 2023-07

A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF

MENLO PARK APPROVING A USE PERMIT FOR THE DEMOLITION OF

AN EXISITNG ONE-STORY, SINGLE-FAMILY RESIDENCE AND

CONSTRUCTION OF A NEW TWO-STORY, SINGLE-FAMILY

RESIDENCE ON A SUBSTANDARD LOT WITH REGARD TO MINIMUM
LOT WIDTH AND AREA IN THE R-1-U (SINGLE FAMILY URBAN

RESIDENTIAL) ZONING DISTRICT
WHEREAS, the City of Menlo Park (“City”) received an application requesting to demolish an existing one-story, single-family residence, and construct a new two-story residence on a substandard lot with regard to minimum lot width and area in the Single Family Urban Residential (R-1-U) zoning district (the “Project”) from Thomas James Homes (“Owner” and “Applicant”) located at 440 University Drive (APN 071-403-280) (“Property”). The Project use permit is depicted in and subject to the development plans and project description letter which are attached hereto as Exhibit A and Exhibit B, respectively, and incorporated herein by this reference; and WHEREAS, the Property is located in the Single Family Urban Residential (R-1-U) district. The R-1-U district supports single-family residential uses; and WHEREAS, the proposed Project complies with all objective standards of the R-1-U district; and
WHEREAS, the proposed Project was reviewed by the Engineering Division and found to be in compliance with City standards; and
WHEREAS, the Applicant submitted an arborist report prepared by California Tree and Landscaping Consulting, Inc. which was reviewed by the City Arborist and found to be in compliance with the Heritage Tree Ordinance and proposes mitigation measures to adequately protect heritage trees in the vicinity of the project; and WHEREAS, the Project, requires discretionary actions by the City as summarized above, and therefore the California Environmental Quality Act (“CEQA,” Public Resources Code Section §21000 et seq.) and CEQA Guidelines (Cal. Code of Regulations, Title 14, §15000 et seq.) require analysis and a determination regarding the Project’s environmental impacts; and
WHEREAS, the City is the lead agency, as defined by CEQA and the CEQA Guidelines, and is therefore responsible for the preparation, consideration, certification, and approval of environmental documents for the Project; and WHEREAS, the Project is categorically except from environmental review pursuant to Cal. Code of Regulations, Title 14, §15303 et seq. (New Construction or Conversion of Small Structures); and





 








ATTACHMENT D Page G-1.36
Resolution No. 2023-07
2 WHEREAS, all required public notices and public hearings were duly given and held according to law; and
WHEREAS, at a duly and properly noticed public hearing held on )HEUXDU\, 202, the Planning Commission fully reviewed, considered, and evaluated the whole of the record including all public and written comments, pertinent information, documents and plans, prior to taking action regarding the Project.

NOW, THEREFORE, THE MENLO PARK PLANNING COMMISSION HEREBY RESOLVES AS FOLLOWS:

Section 1. Recitals. The Planning Commission has considered the full record before it, which may include but is not limited to such things as the staff report, public testimony, and other materials and evidence submitted or provided, and the Planning Commission finds the foregoing recitals are true and correct, and they are hereby incorporated by reference into this Resolution.

Section 2. Conditional Use Permit Findings. The Planning Commission of the City of Menlo Park does hereby make the following Findings:

The approval of the use permit for the construction of new two-story residence on a substandard lot is granted based on the following findings which are made pursuant to Menlo Park Municipal Code Section 16.82.030:

1. That the establishment, maintenance, or operation of the use applied for will, under the circumstance of the particular case, not be detrimental to the health, safety, morals, comfort and general welfare of the persons residing in the neighborhood of such proposed use, or injurious or detrimental to property and improvements in the neighborhood or the general welfare of the city because:
a. Consideration and due regard were given to the nature and condition of all adjacent uses and structures, and to general plans for the area in question and surrounding areas, and impact of the application hereon; in that, the proposed use permit is consistent with the R-1-U zoning district and the General Plan because two-story residences are allowed to be constructed on substandard lots subject to granting of a use permit provided that the proposed residence conforms to applicable zoning standards, including, but not limited to, minimum setbacks, maximum floor area limit, and maximum building coverage.
b. The proposed residence would include the required number of off-street parking spaces because one covered and one uncovered parking space would be required at a minimum, and two covered parking spaces are provided.





 








Page G-1.37
Resolution No. 2023-07
3 Section 3. Conditional Use Permit. The Planning Commission approves Use Permit No. PLN2022-00050, which use permit is depicted in and subject to the development plans and project description letter, which are attached hereto and incorporated herein by this reference as Exhibit A and Exhibit B, respectively. The Use Permit is conditioned in conformance with the conditions attached hereto and incorporated herein by this reference as Exhibit C.

Section 4. ENVIRONMENTAL REVIEW. The Planning Commission makes the following findings, based on its independent judgment after considering the Project, and having reviewed and taken into consideration all written and oral information submitted in this matter:

A. The Project is categorically except from environmental review pursuant to Cal. Code of Regulations, Title 14, §15303 et seq. (New Construction or Conversion of Small Structures)
Section 5. SEVERABILITY
If any term, provision, or portion of these findings or the application of these findings to a particular situation is held by a court to be invalid, void or unenforceable, the remaining provisions of these findings, or their application to other actions related to the Project, shall continue in full force and effect unless amended or modified by the City.

I, Corinna Sandmeier, Principal Planner and Planning Commission Liaison of the City of Menlo Park, do hereby certify that the above and foregoing Planning Commission Resolution was duly and regularly passed and adopted at a meeting by said Planning Commission on February 6, 2023, by the following votes:

AYES: Do, Harris, Riggs, Schindler
NOES: None
ABSENT: None
ABSTAIN: Barnes, Tate
IN WITNESS THEREOF, I have hereunto set my hand and affixed the Official Seal of said City on this 6th day of February, 2023
______________________________
Corinna Sandmeier
Principal Planner and Planning Commission Liaison
City of Menlo Park





 








Page G-1.38
Resolution No. 2023-07
4 Exhibits
A. Project Plans
B. Project Description Letter
C. Conditions of Approval





 








Page G-1.39
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH
DATE
JOB NO.

A.0

COVER SHEET
440 University Dr. MENLO PARK, CA
PLANNING SUBMITTAL FOR:

VICINITY MAP:

N

NOT TO SCALE
Developer Thomas James Homes255 Shoreline Dr Suite 428Redwood City, CA 94065Tel: (408) 402-3024ArchitectDahlin Group 5865 Owens Drive Pleasanton, CA 94588Tel: (925) 251-7200 Contact: Jaime [email protected] LandscapeVan Dorn Abed Landscape Architects, Inc.81 14th Street,San Francisco, CA 94103Tel: (415) 864-1921Contact: Hoanglan [email protected] PROJECT TEAM INFO: ARCHITECTURAL:

A.0 TITLE SHEETA.1 SITE AERIAL & PHOTOSAP1 AREA PLANA.3 SITE PLANA.4 FLOOR PLANSA.5 ROOF PLANA.6 FLOOR AREA DIAGRAMSA.7 ELEVATIONSA.8 ELEVATIONS A.9 SECTIONSA.10 COLORS & MATERIALS

RENDERING & COLOR BOARD
SHEET INDEX:

AS-BUILTS:1 FLOOR PLAN2 ROOF PLAN3 EXTERIOR ELEVATIONSCIVIL:TO1 TOPOGRAPHIC SURVEYLANDSCAPE:L1.1 CALLOUT/ LAYOUT PLANL1.2 CONSTRUCTION DETAILSL2.1 IRRIGATION NOTES & WELO CHECKLISTL3.1 PLANTING PLAN & LEGENDL3.2 PLANTING DETAILSL3.3 TREE PROTECTION PLAN & NOTES LOCATION 440 UNIVERSITY DR.

ASSESSOR’S PARCEL NUMBER 071-403-280PARCEL AREA - GROSS 5,200 SQ. FT. 0.12 ACZONING DESIGNATION R-1-UOCCUPANCY GROUP R-3CONSTRUCTION TYPE V-B MAX. FLOOR AREA LIMIT 2,800.00 SQ. FT. PROPOSED FLOOR AREA LIMIT 2755.84 SQ. FT.

FAL (INCLUDING ADU
EXCEEDANCE) 3033.12 SQ. FT.

MAX. BUILDING COVERAGE 1,820.00 SQ. FT. PROPOSED BUILDING COVERAGE 1,778.84 SQ. FT. (5,200)(.35)
PROPOSED BUILDING COVERAGE(INCLUDING ADU EXCEEDANCE) 2056.12 SQ. FT.

MAX. BUILDING HEIGHT 28’ PROPOSED BUILDING HEIGHT 26’-3 1/2”

FROM ANG

REQUIRED SETBACKS
FRONT - STREET (FT) 20’

FRONT - STREET-
AT GARAGE (FT) 20’
SIDE (FT) 5’-3”REAR (FT) 20’
PARKING REQUIRED:
2 TOTAL SPACES
MIN. GARAGE DIMENSIONS: 10’ X 20’ PER SPACE
EXISTING USE: ONE SINGLE FAMILY DETACHED RESIDENCE OF TO BE DEMOLISHED.PROPOSED USE: ONE NEW SINGLE FAMILY DETACHED RESIDENCE OF 3033.12 SQ. FT.CODES AND REGULATIONS GOVERNING THE PROJECT: CURRENT 2022 CALIFORNIA CODES

PROPOSED SETBACKS
FRONT - STREET (FT) 21’-8”
FRONT - STREET- AT GARAGE (FT) 24’-8”
SIDE - RIGHT (FT) 5’-4 1/2”SIDE - LEFT (FT) 8’-1 1/2”REAR (FT) 20’-10” ALL EXISTING CRACKED OR DAMAGED FEATURES ALONG THE PROPERTY FRONTAGE MUST BE REPAIRED IN KIND. ADDITIONALLY, ANY FRONTAGE IMPROVEMENTS WHICH ARE DAMAGED AS A RESULT OF CONSTRUCTION WILL BE REQUIRED TO BE REPLACED. ALL FRONTAGE IMPROVEMENT WORK SHALL BE IN ACCORDANCE WITH THE LATEST VERSION OF THE CITY STANDARD DETAILS.ANY ENCROACHMENT PERMIT FROM THE ENGINEERING DIVISION IS REQUIRED PRIOR TO ANY CONSTUCTION ACTIVITIES, INCLUDING UTILITY LATERALS, IN THE PUBLIC RIGHT OF WAY.

DEVELOPMENT SUMMARY

FRONTAGE IMPROVEMENTS
440 UNIVERSITY DR.

FIRST FLOOR 1031.59 SQ. FT.

SECOND FLOOR 1287.00 SQ. FT. TOTAL LIVING 2318.59 SQ. FT. GARAGE 437.25 SQ. FT. ADU 277.28 SQ. FT. PORCH 54.50 SQ. FT. LANAI 247.50 SQ. FT. TOTAL: (LIVING + GARAGE) 2755.84 SQ. FT.

FAL: (LIVING + GARAGE + ADU) 3033.12 SQ. FT. MAX. FAL: 2800.00 SQ. FT.

THOMAS JAMES HOMES
STANDARD S.F.(LIVING+ ADU + 24) 2619.87 SQ. FT. )
...
..
.
.
....
3 BEDROOMS / 3.5 BATH +
1 BEDROOM / 1 BATH ADU

BUILDING COVERAGE
FIRST FLOOR 1039.59 SQ. FT. GARAGE 437.25 SQ. FT. PORCH 54.50 SQ. FT. LANAI 247.50 SQ. FT. ADU 54.50 SQ. FT. FIREPLACE 8.00 SQ. FT. TOTAL (W/O ADU): 1778.84 SQ. FT.

TOTAL (WITH ADU): 2056.12 SQ. FT.

MAX. BLDG. COVERAGE 1820.00 SQ.FT.
.
....
.
..
.

PROJECT LOCATION
UNIVERSITY DR. MIDDLE AVE.
(;+,%,7$





 








Page G-1.40
SITE
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH
DATE
JOB NO.

A.1

SITE AERIAL & PHOTOS
1 2 3 4

NOT TO SCALE
UNIVERSITY DR.
1 2
3 4
MIDDLE AVE.





 








Page G-1.41
Feet
0 20 40
College Ave Santa Cruz Ave University Drive
Middle Ave
PREPARED FOR:
877-381-4092
REDWOOD CITY, CA 94065
255 SHORELINE DRIVE, SUITE 428

THOMAS JAMES HOMES

CALIFORNIA MENLO PARK
••





 








Page G-1.42
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH
DATE
JOB NO.

A.3

SITE PLAN

REFER TO LANDSCAPE

SHEETS FOR TREE DETAILS
This Site Plan contains information beyond the scope of work of the Architect. Information provided by Civil Engineer, Landscape Architect, DQG$UERULVWVKDOOEHYHUL¿HGLQWKHLUUHVSHFWLYHGRFXPHQWV 440 UNIVERSITY DR.

FIRST FLOOR 1031.59 SQ. FT.

SECOND FLOOR 1287.00 SQ. FT. TOTAL LIVING 2318.59 SQ. FT. GARAGE 437.25 SQ. FT. ADU 277.28 SQ. FT. PORCH 54.50 SQ. FT. LANAI 247.50 SQ. FT. TOTAL: (LIVING + GARAGE) 2755.84 SQ. FT.

FAL: (LIVING + GARAGE + ADU) 3033.12 SQ. FT. MAX. FAL: 2800.00 SQ. FT.

THOMAS JAMES HOMES
STANDARD S.F.(LIVING+ ADU + 24) 2619.87 SQ. FT. )
...
....
....
3 BEDROOMS / 3.5 BATH +
1 BEDROOM / 1 BATH ADU

BUILDING COVERAGE
FIRST FLOOR 1039.59 SQ. FT. GARAGE 437.25 SQ. FT. PORCH 54.50 SQ. FT. LANAI 247.50 SQ. FT. ADU 54.50 SQ. FT. FIREPLACE 8.00 SQ. FT. TOTAL (W/O ADU): 1778.84 SQ. FT.

TOTAL (WITH ADU): 2056.12 SQ. FT.

MAX. BLDG. COVERAGE 1820.00 SQ.FT.
.
.
.
.
.
.
..
.
4" MIN.

S.C.D.

DUAL

LOCKING
DOOR
MIN. SETBACK
5'-3"
MIN. SETBACK
5'-3"
MIN. SETBACK
MIN. SETBACK
0" '-02
24'-8"

UNIVERSITY AVENUE
440 UNIVERSITY DR.

FFE = 74.06
SEE CIVIL SHEET GP-1

FOR MORE INFORMATION
LANAI
GARAGE

73.56 73.72

73.72 ELEC.

METER
GAS
METER
1 1/2" 8'-1
21'-8"
22'-2"
T
20'-2"
20'-10"
9'-2 1/2"
5'-4 1/2"
7'-8 1/2" 7' 8 1/2

EXISTING BUILDING

TO BE DEMOLISHED

EXISTING WOOD DECK

TO BE DEMOLISHED

EXISTINGNEIGHBORING

BUILDING

EXISTING

NEIGHBORING

BUILDING

DRIVEWAY

EXISTING

NEIGHBORING

BUILDING
52'-0"
100'-0"
16'-3"
12'-1 1/2" - 1
R. SETBACK) R (2ND FLR. (2ND FL
12'-4 1/2"
(2ND FLR. SETBACK)
" '-102
20'-1"
0 N

MINSETBACK
2 E
E
/
M 4"
(2
8-
1 E
E
R.

MIN. SE
1 3
0 -1 20'
2 2
Y
M 4"
AI LAN
5 4 1/2
GAS
NG
E
7 MIN 4"
E
S
4 S
G
M
/2"
A
M N. SETBAC
A M TBIN. SET
3 7' 8 1/2 7



















NON-PROTECTED
TREE TO REMAIN, TYP.

NON-PROTECTED TREES O
TO REMOVE, TYP. O

N




NON-PROTECTED TREE O C
TO REMOVE, TYP. O
NEW 36" WOOD FENCE O FE 6

NEW WOOD FENCE, O W

SEE LANDSCAPE DWG S A
NEW 36" WOOD FENCE 6

NEW WOOD FENCE, W

SEE LANDSCAPE DWG A

HIGHEST POINT NEAR RIGHT SETBACK FOR

AVERAGE GRADE AT RIGHT SETBACK TO
DETERMINE DAYLIGHT PLANE = 72.58

HIGHEST POINT NEAR LEFT SETBACK FOR TS ET

AVERAGE GRADE AT LEFT SETBACK TO GE E
DETERMINE DAYLIGHT PLANE= 72.52 MR A

LOWEST POINT NEAR LEFT SETBACK FOR

AVERAGE GRADE AT LEFT SETBACK TO
DETERMINE DAYLIGHT PLANE= 72.40 NE

LOWEST POINT NEAR RIGHT SETBACK FOR

AVERAGE GRADE AT RIGHT SETBACK TO
DETERMINE DAYLIGHT PLANE = 72.24

HIGHEST POINT UNDER BUILDING FOR S U

AVERAGE NATURAL GRADE TO DETERMINE A AL
BUILDING HEIGHT = 72.63
GA
TER

PROPERTY LINE P Y P
NEW AC EQUIPMENT NOT TO EXCEED 60 dBA EDURING THE DAY AND 50 dBA AT NIGHT NEW AC EQUIPMENT NOT TO EXCEED 60 dBA
DURING THE DAY AND 50 dBA AT NIGHT


LOWEST POINT UNDER BUILDING FOR

AVERAGE NATURAL GRADE TO
DETERMINE BUILDING HEIGHT = 72.59
B
0" '-02
T
V
8'-6"
RKING
"6'-61

G ADU PAR ADU PAR
PACE S

LANDING AT GRADE - FOR N
HANDSCAPE, S.L.D. N
;
;
; ;
;

NON-PROTECTED TREE
TO REMOVE, TYP. NON-PROTECTED TREE
TO REMOVE, TYP.

NON-PROTECTED TREE
TO REMOVE, TYP.
;

NON-PROTECTED TREES
TO REMOVE, TYP.
;
;

NON-PROTECTED TREE
TO REMOVE, TYP.

NON-PROTECTED TREE
TO REMOVE, TYP.
;





 








Page G-1.43
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH
DATE
JOB NO.

A.4

FIRST FLOOR PLAN

FIRST FLOOR PLAN
SCALE: 1/4" = 1'-0"
WH
AC
UP

EN OZ OP R D ZONER
20'-0" 6'-4" 12'-2"
18'-2" 16'-6"
"0'-51 0" 42'-
"2/ '-11 132
38'-6"
34'-8"
0" '- 59
2"/ 16'- 30
3'-3" 2'-8" x
AV CLO. AV

SLOPED CLG P D
16'-3" 11'-3" x
ADU
10'-1" CLG 10' 1" CLG
5'-0" 7'-10" x

H DU BATH DU BATH DU BATH DA
G 8'-9" CLG 8' 9" CLG 8'-9" CLG
13'-1" 5'-4" x
FOYER
10'-1" CLG
12'-1" 16'-11" x
DINING
10'-1" CLG
15'-0" 16'-6" x
LANAI
20'-1" 20'-1" x
GARAGE
10'-1" CLG ABV. T.O.SLAB @ HOUSE
4'-10" 5'-6" x
PWDR
9'-1" CLG 9'-1" CLG
12'-7" 16'-1" x

KITCHEN
10'-1" CLG
14'-7" 16'-11" x

GREAT ROOM
10'-1" CLG
4'-10" 4'-8" x
PANTRY
9'-1" CLG 9'-1" CLG
H
G
0" 5'- -2" 3' x
W.I.C.
9'-1" CLG 9 1" CLG 9'-1"CLG
0"

VENT F/P/

THRU WALL

TO OUTSIDE
AC
19 R @ 7.14"
17 T @ 10.5"
6" 2'-
7'-0" 5'-4" x
PORCH
10'-1" CLG
G
3 D
8 1
U
"6 6" 1'-
4" MIN.

S.C.D.

SINKBURNER

ELECTRIC ELECTR C

COOKTOP W/ COOKTOP W/

HOOD, LIGHT HOOD, LIGHT

AND FAN ABOVE AND FAN ABOVE

REFRIGERATOR REFR GI ERATOR
A
A.9
B
A.9
DUALLOCKINGDOOR 20'-1"
"2/ 10'-02

SECOND FLOOR PLAN
SCALE: 1/4" = 1'-0"
DN 19 R @ 7.14" 17 T @ 10.5"
13'-3" 10'-4" x

PRIMARY BATH
8'-7" CLG
8'-3" 5'-8" x

LAUNDRY
8'-7" CLG
5'-0" 11'-7" x
BA 2
8'-7" CLG
12'-1" 10'-1" x
LOFT
8'-7" CLG
14'-4" 17'-3" x

PRIMARY

BEDROOM
8'-7" CLG
11'-3" 11'-0" x
BEDROOM 3
8'-7" CLG
12'-3" 11'-8" x
BEDROOM 2
8'-7" CLG
7'-1" 10'-4" x
W.I.C.
8'-7" CLG
"0'- 53
2"/ '-2 151 0" 4'-13
18'-2" 16'-6"
34'-8"
"0'-51"0'-02"0'-81
"0'- 53
3'-2" 13'-6 1/2" 13'-11 1/2" 4'-0"
34'-8"
"2/ 2'-11 1
B
A.9
A
A.9
440 UNIVERSITY DR.
1031.59 SQ. FT.

SECOND FLOOR 1287.00 SQ. FT. TOTAL LIVING 2318.59 SQ. FT. GARAGE 437.25 SQ. FT. ADU 277.28 SQ. FT. PORCH 54.50 SQ. FT. LANAI 247.50 SQ. FT. TOTAL: (LIVING + GARAGE) 2755.84 SQ. FT. FAL: (LIVING + GARAGE + ADU) 3033.12 SQ. FT. MAX. FAL: 2800.00 SQ. FT.

THOMAS JAMES HOMES
STANDARD S.F.(LIVING+ ADU + 24) 2619.87 SQ. FT. )
...
....
....
3 BEDROOMS / 3.5 BATH +
1 BEDROOM / 1 BATH ADU

BUILDING COVERAGE
FIRST FLOOR 1039.59 SQ. FT. GARAGE 437.25 SQ. FT. PORCH 54.50 SQ. FT. LANAI 247.50 SQ. FT. ADU 54.50 SQ. FT. FIREPLACE 8.00 SQ. FT. TOTAL (W/O ADU): 1778.84 SQ. FT.

TOTAL (WITH ADU): 2056.12 SQ. FT.

MAX. BLDG. COVERAGE 1820.00 SQ.FT.
.
.
.
.
.
.
..
.





 








Page G-1.44
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH
DATE
JOB NO.

A.5

ROOF PLAN
SCALE: 1/4" = 1'-0"
B
A.9
A
A.9
10 1/2"

ROOF PLAN

ALL ROOFING MATERIAL IS COMPOSITION
SHINGLE UNLESS OTHERWISE NOTED.

POTENTIAL SOLAR ZONE
RIDGE
RIDGE
RIDGE
RIDGE
HIP
HIP
HIP
HIP
HIP
HIP
HIP
HIP
HIP
HIP
HIP
VALLEY
VALLEY
VALLEY
VALLEY
1’-0” EAVE TYP.
1’-0” EAVE TYP.
1’-0” RAKE
TYP.
6” RAKE
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
SLOPE
4 : 12
**

SETBACK LINE

SETBACK LINE
VALLEY
** AS PER MENLO PARK GUIDELINES,
18” INTRUSION OF ARCHITECTURAL

FEATURES, SUCH AS EAVES, IS

ALLOWABLE INTO ANY YARD OF
LESS THAN 10’. 3’ INTRUSION OF

ARCHITECTURAL FEATURES, SUCH

AS EAVES, IS ALLOWABLE INTO ANY
YARD OF 10’ OR GREATER.





 








Page G-1.45
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH
DATE
JOB NO.

A.6

FLOOR AREA DIAGRAMS
16'-0" 20'-7" x
G1
22'-6" 12'-2" 2 x
ADU 1
19'-7" 12'-2" 9'- '-
A
x
19'-0" 4'-4"
B
x
34'-0" 18'-2" 4
C
x
3'-6" 3'-10" x
G3
16'-0" 5'-10"
D
x
15'-0" 16'-6" " x
LANAI
4'-6" 5'-4" x
PORCH 1 PO
2'-6" 5'-10" 2 x
PORCH 2
2'-0" 7'-4" 0 2 x
PORCH 3 6" 81'-" 8 -1 " 6 8' 1" x
ADU 2
4'-6" 21'-0" 4 x
G2

FIRST FLOOR AREA DIAGRAM
SCALE: 1/4" = 1'-0"
5'-4" " 1'-6 x
FP
5 "
12'-7" 16'-6"
A
x
4'-1" 12'-6" 4'-1"
B
x
14'-5" 14'-0" 5" 14
C
x
15'-3" 18'-2"
D
x
19'-4" 15'-0" -4 5'
E
x
4'-1" 15'-0" 4
F
x
11'-6" 13'-7"
G
x
3'-6" 7'-4"
H
x
3'-6" 4'-8"
I
x

SECOND FLOOR AREA DIAGRAM
SCALE: 1/4" = 1'-0"

FIRST FLOOR AREA
A 238.26 SQ. FT. 12'-2" X 19'-7"
B 82.33 SQ. FT. 4'-4" X 19'-0"
C 617.67 SQ. FT. 18'-2" X 34'-0"
D 93.33 SQ. FT. 5'-10" X 16'-0"
TOTAL 1031.59 SQ. FT.

GARAGE
G1 329.33 SQ. FT. 20'-7" X 16'-0"
G2 94.50 SQ. FT. 21'-0" X 4'-6"G3 13.42 SQ. FT. 3'-10" X 3'-6" TOTAL 437.25 SQ. FT.

ADU
ADU 1 273.24 SQ. FT. 12'-2" X 22'-6"ADU 2 4.04 SQ. FT. 8'-1" X 6" TOTAL 277.28 SQ. FT.

PORCH
PORCH 1 24.00 SQ. FT. 5'-4" X 4'-6"PORCH 2 15.83 SQ. FT. 5'-10" X 2'-6"PORCH 3 14.67 SQ. FT. 7'-4" X 2'-0" TOTAL 54.50 SQ. FT.

SECOND FLOOR AREA
A 207.63 SQ. FT. 16'-6" X 12'-7"B 51.04 SQ. FT. 12'-6" X 4'-1" C 201.83 SQ. FT. 14'-0" X 14'-5"
D 277.04 SQ. FT. 18'-2" X 15'-3"
E 290.00 SQ. FT. 15'-0" X 19'-4"
F 61.25 SQ. FT. 15'-0" X 4'-1"
G 156.21 SQ. FT. 13'-7" X 11'-6"
H 25.67 SQ. FT. 7'-4" X 3'-6"
I 16.33 SQ. FT. 4'-8" X 3'-6"
TOTAL 1287.00 SQ. FT.

FLOOR AREA LIMIT
FIRST FLOOR 1031.59 SQ. FT.

SECOND FLOOR 1287.00 SQ. FT.

GARAGE 437.25 SQ. FT. ADU 277.28 SQ. FT. TOTAL 3033.12 SQ. FT.

LIVING + GARAGE 2755.84 SQ. FT.

MAX. F.A.L. 2800.00 SQ. FT.

BUILDING COVERAGE
FIRST FLOOR 1031.59 SQ. FT. LANAI 247.50 SQ. FT. 16'-6" X 15'-0" PORCH 54.50 SQ. FT. GARAGE 437.25 SQ. FT. ADU 277.28 SQ. FT. FIREPLACE 8.00 SQ. FT. 1'-6" X 5'-4" TOTAL 2056.12 SQ. FT.TOTAL W/O ADU 1778.84 SQ. FT.MAX. BUILDING COVERAGE 1820.00 SQ. FT. C
..
.
.
.
.
..
..
.
.
....
.
.
...
.
.
..
...
..
....
.
.
..
.
...
"
"
""
"
""
""
"
"
"
"
"
"""
"
"
""
"
"





 








Page G-1.46
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH
DATE
JOB NO.

A.7
12 4 12 4
12 4
12 4
FX
T.O.P.

T.O.S.F.

T.O.S./T.O.C.

T.O.WDW.

T.O.P.

T.O.WDW.
"0'-8
'-1"01
" 1'-2 3/4"
" '-78
"6 7'-
"2/ 13'-6 - 2 +/
T.O.P.

T.O.S.F.

T.O.S./T.O.C.

T.O.WDW.

T.O.P.

T.O.WDW.
"0'-8
'-1"01
"4 3/ 1'-2
" '-78
"6 7'-

FRONT ELEVATION
SCALE: 1/4" = 1'-0"
DAYLIGHT PLANE (28'-0" MAX. HT.)
1234
F.F.E.= 74.06 F.F.E.= 74.06

AVERAGE
GRADE= +/- 72.61
"0'- 28

E RADG E G M AVERAO FR
"6'-91

KC ETBAS RADE AT G E G M AVERAO FR
45°
5'-3"

TO PROPERTY LINE T
5'-3"

TO PROPERTY LINE

AVERAGE

GRADE AT RIGHT
SETBACK= +/- 72.41

AVERAGE

GRADE AT LEFT
SETBACK= +/- 72.46
"6'-91
45°
"6'-2
0 3'-" 0" 3'-
1'-0"
1'-0"
6"
12 4
12 4
T.O.P.

T.O.S.F.

T.O.S./T.O.C.
"6 7'- 0" '-8
T.O.WDW.

T.O.P.

T.O.WDW.

T.O.P.

T.O.S.F.

T.O.S./T.O.C.
"4 3/ 1'-2
"6 7'-
" '-78
0" '-8
" '-101
T.O.WDW.

T.O.P.

T.O.WDW.
" '-78
4 1'-2 3/4" 1" '- 10
"2/ 13'-6 - 2 +/

RIGHT ELEVATION
SCALE: 1/4" = 1'-0" SCALE: 1/4" 1' 0"
12 4
12 4
12 4

TBD TO FENCE LINE
FX
12 4
FX
F.F.E.= 74.06 F.F.E.= 74.06
AVERAGE GRADE= +/- 72.61
0 4'-" 0 4'-" 0 4'-"
6 3'-" 6 3'-" 6 3'-" 6 3'-"

ROOF MATERIAL COMPOSITION SHINGLE ROOF

BODY COLORWOOD FASCIA TRIMBODY COLOR CEMENTITIOUS HORIZONTAL SIDINGBODY COLOR CEMENTITIOUS WINDOW & DOOR TRIMWOOD BAY WINDOW STEEL GARAGE DOORACCENT COLOR FIBERGLASS FRONT DOORWOOD COLUMN & TRIM

ROOF MATERIALCOMPOSITION SHINGLE ROOF

BODY COLORCEMENTITIOUS WINDOW & DOOR TRIMBODY COLOR CEMENTITIOUS HORIZONTAL SIDING

ACCENT MATERIAL BRICK VENEER

ACCENT COLOR WOOD PORCH COLUMN

ELEVATIONS
10 1/2”
**
** AS PER MENLO PARK GUIDELINES,
WINDOWSMARVIN ESSENTIAL ALL ULTREX WINDOWS TYP. - NO SIMULATED DIVIDED LITE 18” INTRUSION OF ARCHITECTURAL

FEATURES, SUCH AS EAVES, IS

ALLOWABLE INTO ANY YARD OF
LESS THAN 10’. 3’ INTRUSION OF

ARCHITECTURAL FEATURES, SUCH

AS EAVES, IS ALLOWABLE INTO ANY
YARD OF 10’ OR GREATER.





 








Page G-1.47
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH
DATE
JOB NO.

A.8

ELEVATIONS
WINDOWSMARVIN ESSENTIAL ALL ULTREX WINDOWS TYP. - NO SIMULATED DIVIDED LITE FX
12 4
T.O.P.

T.O.S.F.

T.O.S./T.O.C.

T.O.WDW.

T.O.P.

T.O.WDW.
0" '-8
'-1"01
"6 7'-
" '-78
"4 3/ 1'-2
T.O.P.

T.O.S.F.

T.O.S./T.O.C.

T.O.WDW.

T.O.P.

T.O.WDW.
0" '-8
'-1"01
"6 7'-
" '-78
" 1'-2 3/4"
"2/ 13'-6 - 2 +/

LEFT ELEVATION
SCALE: 1/4" = 1'-0"
"2/ 14'-4 1
T.O.WDW.
12 4
FX FX
D
12 4
12 4
F.F.E.= 74.06 F.F.E.= 74.06
FX FX
AVERAGE GRADE= +/- 72.61
12 4
0" '-3
0" '-3
"6'-6
0" '-3
0 3'-"
"
T.O.STAIRLANDING
6 3'-" 6 3'-" 6 3'-" 6 3'-" 6 3'-"" - 3'0
"- 6'0"
6" '-3
T.O.P.

T.O.S.F.

T.O.S./T.O.C.
1'-2 3/4"
6" 7'-
'-7"84
0" '-8
1" '- 10
T.O.WDW.

T.O.P.

T.O.WDW.

T.O.P.

T.O.S.F.

T.O.S./T.O.C.
4" 3/ '-2 1
6" 7'-
'-7"8
0" '-8
1" '- 10
T.O.WDW.

T.O.P.

T.O.WDW.
12 4
12 4

REAR ELEVATION
SCALE: 1/4" = 1'-0"
12 4
12 4
12 4
DAYLIGHT PLANE (28'-0" MAX. HT.)
F.F.E.= 74.06 F.F.E.= 74.06

AVERAGE
GRADE= +/- 72.61

AVERAGE

GRADE AT RIGHT
SETBACK= +/- 72.41

AVERAGE

GRADE AT LEFT
SETBACK= +/- 72.46
5'-3"

TO PROPERTY LINE
5'-3"

TO PROPERTY LINE
6" '-91

CK ETBAS RADE AT G E G M AVERAO FR
6" '-91

CK ETBAS RADE AT G E G M AVERAO FR
"2/ 13'-6 - 2 +/
0" '- 28

E RADG E G M AVERAO FR
45°
"- 3'0" ' 3-0"
45°
0 3'-"
"- 3'6"" - 3'6
6"
1'-0"

ROOF MATERIAL COMPOSITION SHINGLE ROOF

BODY COLORWOOD FASCIA TRIMBODY COLOR CEMENTITIOUS HORIZONTAL SIDING BODY COLORCEMENTITIOUS WINDOW & DOOR TRIM

ROOF MATERIALCOMPOSITION SHINGLE ROOF

BODY COLORCEMENTITIOUS WINDOW & DOOR TRIMBODY COLOR CEMENTITIOUS HORIZONTAL SIDING ACCENT COLOR WOOD TRELLIS & WOOD POST ** AS PER MENLO PARK GUIDELINES,
18” INTRUSION OF ARCHITECTURAL

FEATURES, SUCH AS EAVES, IS

ALLOWABLE INTO ANY YARD OF
LESS THAN 10’. 3’ INTRUSION OF

ARCHITECTURAL FEATURES, SUCH

AS EAVES, IS ALLOWABLE INTO ANY
YARD OF 10’ OR GREATER.
10 1/2”
**





 








Page G-1.48
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH
DATE
JOB NO.

A.9

SECTIONS
* AS PER THE MENLO PARK MUNICIPAL
CODE (SECTION 16.04.313 FLOOR AREA)

ATTIC SPACE WHERE THE DISTANCE

BETWEEN THE TOP OF THE CEILING

JOIST AND THE BOTTOM OF THE ROOF

SHEATHING MEASURES LESS THAN
FIVE FEET (5’) IS EXCLUDED FROM THE
FLOOR AREA.
** AS PER MENLO PARK GUIDELINES,
18” INTRUSION OF ARCHITECTURAL

FEATURES, SUCH AS EAVES, IS

ALLOWABLE INTO ANY YARD OF
LESS THAN 10’. 3’ INTRUSION OF

ARCHITECTURAL FEATURES, SUCH

AS EAVES, IS ALLOWABLE INTO ANY
YARD OF 10’ OR GREATER.

DROP ZONE
PANTRY PWDR. DINING '-1"
9 6'-8" CLEAR.
2 14'-4 1/2"
"6'-3

LOFT PRIMARY
W.I.C.

SECTION A - A
SCALE: 1/4" = 1'-0"
T.O.P.

T.O.S.F.

T.O.S./T.O.C.

T.O.WDW.

T.O.P.

T.O.WDW.
"0'-8
'-1"01
"4 3/ 1'-2
OP
'-7"8
"6 7'-
2"/ 13'-6 - 2 +/
T.O.P.

T.O.S.F.

T.O.S./T.O.C.

T.O.WDW.

T.O.P.

T.O.WDW.
"0'-8
'-1"01
4" 3/ 1'-2
'-7"8
"6 7'-
DAYLIGHT PLANE (28'-0" MAX. HT.)
F.F.E.= 74.06 F.F.E.= 74.06

AVERAGE
GRADE= +/- 72.61
"0'-82

E RADG E G M AVERAO FR
"6'-91

KC ETBAS RADE AT G E G M AVERAO FR
45°
5'-3"

TO PROPERTY LINE
5'-3"

TO PROPERTY LINE

AVERAGE

GRADE AT RIGHT
SETBACK= +/- 72.41

AVERAGE

GRADE AT LEFT
SETBACK= +/- 72.46
"6'-91

KC ETBAS RADE AT G E G M AVERAO FR
45°
" 4'-7" '-4
3 "6'-3
'-7"8"
8'-6
T.O.DOOR
T.O.P.

T.O.S.F.

T.O.P.

T.O.SLAB/T.O.C.

T.O.WDW.

T.O.WDW.

F.F.E.= 74.06
GREAT
BEDROOM 3 W.I.C. PRIMARY PRIMARY BEDROOM
BATH
SLOPE
2" " 4

SECTION B-B
SCALE: 1/4" = 1'-0"
GARAGE
ROOM

PANTRY KITCHEN
6" 7'- 0" '-8
" '-78
4 1'-2 3/4"
" '-101
T.O.S.F.

T.O.WDW.

T.O.WDW.
6" 7'- 0" '-8
T.O.SLAB/T.O.C.

F.F.E.= 74.06
" '-784 1'-2 3/4"" '-101
T.O.P.

T.O.P.
"2/ 13'-62
" '-19
FX FX

AVERAGE
GRADE= +/- 72.61
"2/ 4'-7 1
2" 2'-6 1/2" 2'
5" '-01
" '-78
8" '-6
T.O.DOOR
*
*
*
*





 








Page G-1.49
440 UNIVERSITY DR., MENLO PARK
D28M200-TR THOMAS JAMES HOMES
5865 Owens DrivePleasanton, CA 94588925-251-7200
1641.044
01-10-2023
NORTH
DATE
JOB NO.

A.10

COLORS & MATERIALS

BODY COLOR HORIZONTAL SIDING, WINDOW & DOOR TRIM

ACCENT COLOR

FRONT DOOR, FRONT PORCH COLUMN &

ACCENT MATERIALBRICK VENEER

BAY WINDOWS, PANELLING, EAVES, FASCIA, GARAGE DOOR, BACK TRELLIS TRIM

ROOF MATERIAL COMPOSITION SHINGLE





 








Page G-1.50
440 UNIVERSITY DRIVE
MENLO PARK, CALIFORNIA 94025

09.09.22 D28 M200 A

TRADITIONAL

KRISTIN LASKY
DAHLIN
ange, on homes prior to sale, at any time This is an example of design specifications for this particular plan and elevation. Detailed specifications, finishes and fixtures are subject to ch ement used, engineering and without notice or obligation. Square footages and lot dimensions are approximate and may vary in construction and depending on the standard of measur ation. Not an offer or solicitation to municipal requirements, or other site-specific conditions. Room size, walls, windows, doors, porches and balconies vary per home elevation and loc 2018 Thomas James Homes. All rights reserved. CA DRE License #02057367 © sell real property. Thomas James Homes is a registered trademark of Thomas James Homes, LLC.

NOTE: RENDERINGS SHOWN

ARE FOR ILLUSTRATION

PURPOSES ONLY AND ARE NOT

INTENDED TO BE AN ACTUAL

DEPICTION OF THE HOME OR
IT’S SURROUNDINGS

EXTERIOR RENDERINGS
(NOT TO SCALE)

HOUSE NUMBERS
TRICORN BLACKSW 6258R FRONT DOORR GARAGE DOOR
WINDOW FRAMES: BLACK

ELDORADO STONETUNDRA BRICK - CHALK DUST

GARAGE DOOR

CLOPAY GRAND HARBOR
DESIGN 11, INSULATED
SOLID TOP 11

EXTERIOR LIGHT FIXTURE
8”W X 15.25”H

FENCE STAIN

SEMI-TRANSPARENT

SPANISH MOSS

GAF ROOF SHINGLESCHARCOAL

FRONT DOOR

MASONITE - HERITAGE - WINSLOW

FIBERGLASS
1/4 LITE 2 PANEL DOOR

FULL SIDELITE
PURE WHITESW 7OO5R SIDINGR WINDOW & DOOR TRIMR PANELING, COLUMNS, & TRIMR FASCIA, EAVES, & CORBELSR BACK TRELLIS 




 








Page G-1.51
64x60
HH: 80
36x52
HH: 80
48x52
HH: 80
36x52
HH: 80
36x52
HH: 80
18x18
HH: 80
36x52
HH: 80
60x46
HH: 80
36x36
HH: 82
36x52
HH: 80

LIVING ROOM
8'-0" CLG

KITCHEN
8-0" CLG

BEDROOM
8'-0" CLG

BEDROOM
8'-0" CLG
GARAGE
8'-0" CLG LOW
DN
18"
DECK

EXPOSED STUDS
DRYWALL (TYP.)
DRYWALL (TYP.)
DRYWALL (TYP.)
13'-3" 1'-11" 5'-5" 1'-11" 11'-5"
12'-1" 12'-4"
8'-2"
24'-8" 8'-4"
11'-6"
21'-5"
DRYWALL (TYP.)
TILE
DRYWALL (TYP.)

STONE FIREPLACE / HEARTH
WOOD FLOORING DRYWALL (TYP.)
8'-0" CLG
8'-0" CLG
8'-0" CLG
8'-0"
CLG
8'-0" CLG
PORCH
DRYWALL (TYP.)
SCALE

PROJECT

APPROVED BY
DATE
SHEET

WORRY FREE

PREPARED FORPLAN TYPEPROJECT NAMEPROJECT ADDRESS

RENOVATIONS
3626 E. PACIFIC COAST
HIGHWAY | 2ND FLOORLONG BEACH CA | 90804

PRECISION PROPERTYMEASUREMENTS
T 562.621.9100
F 888.698.2966
WWW.PPMCO.NET

FLOOR PLAN
3385_BA
06/14/22

THOMAS JAMES
HOMES
440 UNIVERSITY
DRIVE

RESIDENCE
440 UNIVERSITY DRIVE,
MENLO PARK, CA 94025
of 3
All plans created by Precision Property
Measurement Ltd "PPM" are made exclusively
for landscaping purposes (Cal. Bus. & Prof.

Code §8727). All site plans created by PPM do not
involve the determination of any property line, and as
such do not constitute land surveying
(Cal. Bus. & Prof. Code §§8726-8727). In
addition, PPM services and plans do not constitute
civil engineering (Cal. Bus. & Prof. Code §§6702-6704), and thus should not be used for any studies or activities defined as civil engineering (Cal. Bus. & Prof. Code
§6731). All floor plans created by PPM are intended to
be used as a reference for design and construction and
should not be considered a substitute for the services of a licensed structural engineer or licensed architect. PPM makes every reasonable effort to ensure the accuracy of the information found in our plans. However, every
As-Built drawing inherently contains errors to some
degree. It is the duty of the architect, contractor,
designer or other licensed professional, as a consultant to the property owner, to determine the suitability of the As-Built plans prior to construction. Measurements should be field confirmed before commencing construction. in the event that an error is found on a plan, PPM's liability is limited to the amount of the fee paid to PPM.

JS
1 PV
TWH
WH = WATER HEATER

LOW CASEWORKUPPER CASEWORKFULL HEIGHT CASEWORK
FURN
CLG
HH
= WASHER/DRYER COMBO= WASHER= DRYER= RANGE= REFRIGERATOR= OVEN= DISH WASHER= TRASH COMPACTOR= WALL HEATER= GAS METER= ELECTRIC METER= CEILING HEIGHT= HEADER HEIGHT W/D
W
D
REFR
OVEN
DW
TC
= FURNACE= SOLAR COMPONENTS= ELECTRICAL PANEL= TANKLESS WATER HEATER= FLOOR DRAIN WS = WATER SOFTNER
1/4" = 1'-0"





 








Page G-1.52

EXISTING

1.4:12

EXISTING
3:12

EXISTING
5:12

EXISTING
5:12 EXISTING
5:12

EXISTING
5:12

EXISTING
5:12

EXISTING
5:12

EXISTING
5:12

EXISTING
5:12

EXISTING
5:12

EXISTING
5:12

EXISTING
5:12
SCALE

PROJECT

APPROVED BY
DATE
SHEET

WORRY FREE

PREPARED FORPLAN TYPEPROJECT NAMEPROJECT ADDRESS

RENOVATIONS
3626 E. PACIFIC COAST
HIGHWAY | 2ND FLOORLONG BEACH CA | 90804

PRECISION PROPERTYMEASUREMENTS
T 562.621.9100
F 888.698.2966
WWW.PPMCO.NET

ROOF PLAN
3385_BA
06/14/22

THOMAS JAMES
HOMES
440 UNIVERSITY
DRIVE

RESIDENCE
440 UNIVERSITY DRIVE,
MENLO PARK, CA 94025
of 3
All plans created by Precision Property
Measurement Ltd "PPM" are made exclusively
for landscaping purposes (Cal. Bus. & Prof.

Code §8727). All site plans created by PPM do not
involve the determination of any property line, and as
such do not constitute land surveying
(Cal. Bus. & Prof. Code §§8726-8727). In
addition, PPM services and plans do not constitute
civil engineering (Cal. Bus. & Prof. Code §§6702-6704), and thus should not be used for any studies or activities defined as civil engineering (Cal. Bus. & Prof. Code
§6731). All floor plans created by PPM are intended to
be used as a reference for design and construction and
should not be considered a substitute for the services of a licensed structural engineer or licensed architect. PPM makes every reasonable effort to ensure the accuracy of the information found in our plans. However, every
As-Built drawing inherently contains errors to some
degree. It is the duty of the architect, contractor,
designer or other licensed professional, as a consultant to the property owner, to determine the suitability of the As-Built plans prior to construction. Measurements should be field confirmed before commencing construction. in the event that an error is found on a plan, PPM's liability is limited to the amount of the fee paid to PPM.

JS
2 RTU

CHIMNEY OUTLINE

BUILDING FOOTPRINT
= ROOF DRAIN= DOWNSPOUT= AIR CONDITIONER= UTILITY BOX= ROOF VENT= ROOF TOP UNIT= ROOF TOP HATCH 1/4" = 1'-0"





 








Page G-1.53

NORTHEAST

NORTHWEST SOUTHWEST

SOUTHEAST

SHINGLES
(TYP)
12 5
12 3
12 1.4
12 5 12
5 12

1.4 12
3 12
5 7'-5" 8'-0"
1ST FLOOR
F.F.E.

BEDROOM
F.C.E.

MAJOR
RIDGE
15'-5"
8'-0"
16'-11"
GARAGE
F.F.E.

GARAGE
F.C.E.

MAJOR
RIDGE
8'-11"
12 5

BRICK (TYP)

WOOD SIDING
(TYP)

SHINGLES
(TYP)

BRICK (TYP)

WOOD SIDING
(TYP)

WOOD SIDING
(TYP)

BRICK (TYP)

SHINGLES
(TYP)

BRICK (TYP)

WOOD SIDING
(TYP)

WOOD DECK
(TYP)

SHINGLES
(TYP)

NATURAL STONE FINISH
(TYP)

WOOD DECK
(TYP)

NATURAL STONE FINISH
(TYP)
SCALE

PROJECT

APPROVED BY
DATE
SHEET

WORRY FREE

PREPARED FORPLAN TYPEPROJECT NAMEPROJECT ADDRESS

RENOVATIONS
3626 E. PACIFIC COAST
HIGHWAY | 2ND FLOORLONG BEACH CA | 90804

PRECISION PROPERTYMEASUREMENTS
T 562.621.9100
F 888.698.2966
WWW.PPMCO.NET

EXTERIOR

ELEVATIONS
3385_BA
06/14/22

THOMAS JAMES
HOMES
440 UNIVERSITY
DRIVE

RESIDENCE
440 UNIVERSITY DRIVE,
MENLO PARK, CA 94025
of 3
All plans created by Precision Property
Measurement Ltd "PPM" are made exclusively
for landscaping purposes (Cal. Bus. & Prof.

Code §8727). All site plans created by PPM do not
involve the determination of any property line, and as
such do not constitute land surveying
(Cal. Bus. & Prof. Code §§8726-8727). In
addition, PPM services and plans do not constitute
civil engineering (Cal. Bus. & Prof. Code §§6702-6704), and thus should not be used for any studies or activities defined as civil engineering (Cal. Bus. & Prof. Code
§6731). All floor plans created by PPM are intended to
be used as a reference for design and construction and
should not be considered a substitute for the services of a licensed structural engineer or licensed architect. PPM makes every reasonable effort to ensure the accuracy of the information found in our plans. However, every
As-Built drawing inherently contains errors to some
degree. It is the duty of the architect, contractor,
designer or other licensed professional, as a consultant to the property owner, to determine the suitability of the As-Built plans prior to construction. Measurements should be field confirmed before commencing construction. in the event that an error is found on a plan, PPM's liability is limited to the amount of the fee paid to PPM.

JS
3 FINISHED GRADE LINEFINISHED FLOOR LINEROOF PITCH LABEL (RISE/RUN) X
12 1/4" = 1'-0"





 








Page G-1.54
Feet
0 10 20
College Ave Santa Cruz Ave University Drive
Middle Ave
PREPARED FOR:
877-381-4092
REDWOOD CITY, CA 94065
255 SHORELINE DRIVE, SUITE 428

THOMAS JAMES HOMES

CALIFORNIA MENLO PARK
••
11/11/2022





 








Page G-1.55





 








Page G-1.56





 








Page G-1.57





 








Page G-1.58





 








Page G-1.59





 








Page G-1.60





 








Page G-1.61

THOMAS JAMES HOMES
255 Shoreline Dr Suite 428,
Redwood City, CA 94065
440 University Drive Project Description
January 19, 2023

PARCEL GENERAL INFORMATION
The parcel located at 440 University Drive is a substandard lot, which is the reason a Use Permit is required for the proposed two-story residence. The R-1-U zoning ordinance requires a minimum of 7,000 sq ft in area, 65 ft in width and 100ft in depth. The depth complies with the zoning ordinance; however, the lot area of 5200sf and width of 52ft is less than the required.

There are 22 trees analyzed including 6 Heritage trees and 2 non protected trees offsite and 14 non protected trees onsite. 8 of the 14 non protected trees are proposed to be removed. 5 new trees are proposed onsite: 1-ϯϲ͟ŽdžŚŝƚĂůƉĂĂƚƚŚĞĨƌŽŶƚ; 1- Ϯϰ͟ŽdžƌĂƉĞDLJƌƚůĞĂŶĚϭ- Ϯϰ͟ŽdžtĞƐƚĞƌŶ Redbud at the rear; and 2-Ϯϰ͟ďŽdž:ĂƉĂŶĞƐĞĞůŬŽǀĂƐĂƚƚŚĞůĞĨƚƐŝĚĞ. Tree protection will be provided for the trees to remain during construction through fencing as well as construction methods to save the trees from being impacted.

EXISTING HOME TO BE DEMOLISHED
The existing house is a one story single-family minimal traditional home built in 1940. The home is 1130sf including a 260sf garage.

PROPOSED SINGLE FAMILY RESIDENCE
The ƉĂƌĐĞů͛ƐďůŽĐŬƚLJƉŝĐĂůůLJĐŽŶƐŝƐƚƐŽĨŚŽŵĞƐĨĂĐŝŶŐ either College Avenue or Middle Avenue. The corner lots have been merged with their adjacent lots and then subdivided into 3 parcels that are reoriented to face the cross-street of University Drive. The parcels maintain a 50ft width yet are smaller in depth in comparison to the original lots. The homes on these parcels have L shaped footprints to create private rear outdoor spaces. In the immediate context along University Drive, the neighborhood consists of both 2-story and 1-story residences of varying styles including Traditional, Transitional, and Spanish. Main design features include horizontal siding, stucco, brick/stone accents, gable/shed roofs of either metal, comp shingle or S-tile materials, decorative shutters, and bay windows. Porches with columns define some of the entries creating inviting front elevations. Multiple 2-car garage configurations are found including recessed, side facing and front facing.

Continuing the 2-story evolvement using the patterns and aesthetics found in the neighborhood, the new home proposed is a 2-story single family Traditional style residence featuring 3beds/3.5 baths and a 1bed/1bath attached ADU to appeal to families. A combination of horizonal siding and brick are used on the first floor with a smooth panel bay window treatment at the front living space. Square columns and a gable roof form distinguishes the front porch and offers a more traditional aesthetic.

The second-floor massing steps back from the first story to reduce appearance from the street and provide relief along the right and left edges. A front gable provides interest and echoes the surrounding gable/shed roof forms in the neighborhood. The second-floor plate height is lower than typical 9ft and reduces massing. The window sills at the second floor have been raised to 3͛-6͟ for (;+,%,7%





 








Page G-1.62

THOMAS JAMES HOMES
255 Shoreline Dr Suite 428,
Redwood City, CA 94065
privacy while still providing adequate light and ventilation to the living spaces. Additionally, two privacy screening trees have been proposed between existing tree canopies at the left stair window.

A front facing 2-car garage and 2 off street parking spaces are provided. The garage is slightly setback from the main living space to be less prominent. The footprint of the home aligns with the adjacent homes as it uses a similar L shape form stepping back on the left side to create a usable private yard.

A light color palette is proposed to blend well with the neighborhood using an off white for the horizontal siding and a matching brick to provide a warm texture change. Minimalist windows with black window frames compliment the dark accent color for the garage, front door and shingle roof.

NEIGHBOR RELATIONS
Thomas James Homes has reached out to neighbors within 300-ft. of this property with a copy of the site plan, floor plan, elevations and a letter addressing our project. A virtual neighbor meeting was held on October 5, 2022 to collect feedback from the immediate neighbors. In addition, we have coordinated with two neighbors who attended the meeting and have reached out with concerns.

Please see below for a summary of responses to neighbor concerns.

Neighbor at 444 University (left adjacent neighbor)
Concerns: 1) Requested more information on traffic management during construction and results on the asbestos report for demolition of the existing home. 2) Concerned if there was going to be a sidewalk installed at the property to continue the existing sidewalk.

Response: Thomas James Homes responded to the neighbor via email on 11/3/22 to follow up with requested information regarding traffic management and the asbestos report. We also confirmed the Engineering Department does indeed require a new sidewalk on the property and are proposing that improvement in our plans.

Neighbor at 883 Middle Avenue (Rear neighbor)
Concerns: 1) Interested in selling her home to TJH. 2) Requested more information on allowable fence heights. 3) Concerned the house is too close to the rear of the yard and does not desire the two story home close to the shared property line regardless of the compliant setbacks. The Neighbor claims the home and trees will affect/block solar gain.

Response: Thomas James Homes responded to the neighbor via phone multiple times and an email on 11/3/22 to follow up with requested information and concerns. We confirmed the proposal is well within the allowable setbacks and allowable height per the City municipal code and guidelines.

In addition, the proposed home is 78ft from the main home on the 883 property. See the attached thread for email reference.

We look forward to adding to the charm and sense of community in Menlo Park and welcome any questions the City may have as we go through the Use Permit Application process.

Anna Felver, Planning Manager at Thomas James Homes
[email protected] | 650. 402.3024





 








Page G-1.63
 













 





























!
"# $% &
'()*"+#
$,*-+
.

/01
02
34
55676898855:;<.=
:>
?12 4
@:A


13


2
34BC1
2
34B@


1

2 34

DEFGHIJKLM
NEJHOJOJJKLJHPHQLJRQFSFEHTJHUEHVWXTYXZTTJWJTJVQJXWXZTUTXUXOJRLXZOJEXQH[XVHOYXZQHVOJJ KLJRF\JVOFXVORXQZ\JVKJR]^H\UTXSFRFV_VZ\IJTOWTX\XZTUTXWJOOFXVHEUEHVO] ^WYXZLHSJHRRF[XVOKXYXZTLX\JMKLJV`J`XZEREFaJKXHRbZOKXZTUEHVOKXTJcJQKKLXOJHRRF[XVO]^W RJOFTJRM`JQHVQXXTRFVHKJHOZTSJYXVYXZTOFKJKXRXQZ\JVKHRRF[XVHEJdFO[V_IZFERFV_OFVKLJUEHVO] eVRJTOKXXRHVRVXKJRKLHKYXZHTJXIbJQ[V_KXKLJQZTTJVKUTXUXOHEZVEJOO\XRFfQH[XVOHTJ\HRJ] ^Wg`LJVQLHV_JOHTJ\HRJM`J`FEEVX[WYYXZ]
hJOKM
ijjklmnomp
qrstuvwxysstsz{ysyzrv|}uv~rvs€yxtuvsty‚tƒt„tus

†‡ˆk‰Škˆm‰‹‡ˆm‰
ŒŽŽvry~xƒ‘|q’t~r“””|•yxs’~€vrr–|€—˜™Ž˜š
›œŽ”™”žŸ”™ ¡¢£¤u¥
¦§¨©ª«¬­¬¬©®«¯°®±²¯³´µ©´³¶®´·´³¸´±¹
ºryvs{uvr
t„r¥ytxys‘ys»txr„~vys„¥t~~r‘¼t~t~yvr¤ust‘rs~tyxys‘ts~rs‘r‘„uxrx»uv~r’„ru~rts‘tƒt‘’yxuvrs~t~»~u¼u¥~r»yvry‘‘vr„„r‘£½r„~¾ryx~uv¿vu–rv wvuzvy¥½r}y~tusyx„À”|}y~tusyx—„„u¤ty~tusu¢u¥r’tx‘rv„£ ÁÂÃÄÅÆÇÈÉÊËÌÍÎÏÐÑÒÓÔÌÇÎÐÑÒÓÕÖ×ÊÈÇØÒÐ×Ù
ÚÛÜÝÅÞÎÑßàÊÐÌ×ËÌß



ÃÅ
ÊÌÇÌßÔÊÌÇÌßÕÍÎÑàÊØÒÐ×Ù
ÅÐÞÊÌßàÊÇÇÔÍÊÌßàÊÇÇÕÍÎÑàÊØÒÐ×ÙÞÐ××ÌÊÌÇÔÍÐ××ÕÍÎÑàÊØÒÐ×ÙÍÎÈÊÞÎÈÌËÊÑÍ ÔÒÍÎÈÌËÊÑÍÕÍÎÑàÊØÒÐ×Ù
ÚÛÝÅÌ
ÈÌßàÈÍÈ
ÌÇÐÊßÓàÌÍËÊÒÓ






 

2  







 








089







89

















 








Page G-1.64






































!























"


















#
$



$



















$




%






#
&'()*+,-.
$
 //
0

$/



$ /
0

$
1 234 151 4161
7

8








8



 
9:#; 1#5455
66<4
=
>


?



@"
A


<

BCDEFGHIJK
LHMNOMCFPIQJNRHSNRTHMPFUNRFRVWHHURXKYHJFTHIFZHRRNIHN[\NOMSNRSHMRP]^P\NOFMHFYFMHK YHFMHQMNQNPDRXFRHYIYNPINM\IJFIYDCCGHSNWQCDFRIYDIJIJHSDI\WORDSDQFCSNVHFRV XODVHCDRHP]_JHQMNQNPHVJNWHDPNTHM`ab[MNWIJHMHFMQMNQHMI\CDRHFRVNTHM`cb[MNWIJHCHb QMNQHMI\CDRHFRVNTHMcdb[MNW\NOMHeDPURXMHPDVHRSH]^PYHFCPNVDPSOPPHVQMHTDNOPC\KIJHMHFMHRN IMHHPGHDRXMHWNTHVFIIJHMHFMQMNQHMI\CDRHRNMIJHVHRPHIMHHSFRNQ\NfPDIHGHDWQFSIHV] gHFMHPUCCDRIJHVHPDXRQMNSHPPN[IJHQMNhHSIPND[IJHMHFMHOQVFIHPFRVSJFRXHPKYHYDCCRNU[\\NO] 




 








Page G-1.65





 








Page G-1.66









 !"#$
%&'(
)*
(
)+'(
)
,-../
0#1
2
344
52
 6
 789.8:
;<.4=94->?4-9@/ABCDE
FGHIJKLMLLINKOPNQROSTUITSVNTWTSXTQY
Z





 








Page G-1.67
 













 




























 !
"!#$!#%&
"
'(!#

''$)
'

'!(*+#&
$#'
!"!#$
#'#$$
+""%&+('
,
+&'

#$
-
$,!"+(#'
'%'+)
+ '
%!(!$$(

$./0
'1!"'+(20(+3(
4(+5(! /
6!'
+#!"
78988:6!'
+#!";

+*
!'
+#+&<+ 0,
"$(
.
=>?@ABCDEFGHIJKLMNOPHCJLMNOQRSFDCTNLSU
VWXYAZJM[\]F^_`LaHSGH[b_cdccefdegh
i?AgjjFkHCaH[PFlHCaH[QImJM\FTNLSU
noApLjZFqH[\FCCPmIFqH[\FCCQImJM\FTNLSUrZLSS^sHF]HCPILSS^QImJM\FTNLSUrt^jIJDFZJDHGFMI PNIJDHGFMIQImJM\FTNLSU
VuvwWoYAxHfyjDaH[\DI^DjhHjCLzF[O\HIGFNO

{
|
 
}



 

~ 





€

‚


ƒ
€
 „

†‡ˆ‰Š‹Œ


Ž
Ž
Ž

Ž

‘’“”“•
–
}





}


–
—
{
„—
”˜„”“””
••™”“š›œ
ž~ Ÿ

™
š

„
{
|

 



„

„



‚





|

›




|”¡}



”“}




|



















Ž



 







 

€
 „

†‡ˆ‰Š‹Œ¢£¤¥¦
§§¨©‡ªª†‹«¬‹­¤‹


Ž
Ž
Ž

Ž

‘’“”“•





 








Page G-1.68
 



 
 


 





 








Page G-1.69



  





!"#$%&'()*
+#$,,-.-/0//,10,23
+(1%45!
/6 7)5&'()
%45!
/6 7)5&'()*
8'19:8(%!
'(%! !"#$%&'()*;8:!#5+#54$!
'!#54$! !"#$%&'()*
<==>?@ABC==CDEFAGAD
HI?CJK=LM=BN=OCOCPLQ?FFIACAOPIR=BSAATCPUVA?BAQTWWOCFIA>AQOPCBAGOAXYB=ZAQQXOFIFIAZOFK Q=C=LY>?FAQ=BZI?CPAQF=FIAI=SAU
[>O>M=WW=XLYXOFI=LBFA?SF=BAQY=C>F=FIA\LAQT=CQ]Z=CZABCQK=LI?>?FFIASAATCPU^WA?QAQAA RAW=XM=BFI=QABAQY=CQAQ_
`abcdebfghE?MAFKi=CZABC?R=LFFIAROPFBLZJQ=CFIAQFBAAFUi?CK=LIAWYLQR?ZJ=LF=MFIA >BOGAX?Kj
kdlmabldfghHIABAOQ?^B=NAZFS?C?PAB=CQOFAnXI=XOWWBA?ZI=LF?FFIARAPOCCOCP?C>C=ToKK=L XIACW?BPABFBLZJQ?BAApYAZFA>qDFIAKZ?C?ZZ=S=>?FAFIOQBA\LAQFU `abcdebfrhHIOQOQ?RLQKEFBAAFOCFIAZOFK?C>FIABAOQ?W=F=MFB?sZU kdlmabldfrhHI?CJK=LM=BFIAOCQOPIFUtLBFA?SZBA?FAQ?FB?sZS?C?SPACFYW?CM=B?YYB=YBO?FA ?ZZAQQ=MFIAQOFAYBO=BF=Z=CQFBLZT=CU
`abcdebfuhVOWWFIABARA?QO>AX?WJYB=GO>A>j
kdlmabldfuhHIAZOFKACPOCAABOCP>AY?BFSACFOQOC>AA>BA\LOBOCP?CAXQO>AX?WJF=Z=CM=BSXOFIK=LB YB=YABFKvvvwCOGABQOFKUHIOQOQApYAZFA>F=RAOCFIARLOW>OCPPB?>OCP>B?XOCPQOC=B>ABF=BAZAOGA=LB RLOW>OCPYABSOFUVAXOWW?WQ=QI=XFIOQOC=LBZOGOW?BA?YW?CM=B>AQOPCBAGOAXUEAA=LBZOFKZ=SSACF RAW=XU

`abcdebfxhy=X>=K=L>AS=XIACFIABAOQ?QRAQF=QjVIACXOWWXAI?GABAQLWFQOMFIABAOQ?QRAQF=Q ?C>WA?>ji?CXAI?GA?Z=YK=MFIABAY=BFj
kdlmabldfxhVA?ZFL?WWKI?>FIAI=SAFAQFA>M=B?QRAQF=QOCtZF=RABUHIAApOQTCPI=LQAX?QRLOWFOC z{v|U}=QFWOJAWKFIOQXOWWI?GA?QRAQF=QF=BAY=BFUy=XAGABDFIA=CWK?QRAQF=QM=LC>X?QOCn~qHB?CQOFA YOYAQ?C>XABABAS=GA>OSSA>O?FAWKU[I?GA??ZIA>FI?FWAABF=K=LM=BBAMABACZA=BOCZ?QAK=L X?CFA>F=BA?ZI=LFF=FIOQZ=SY?CKM=BS=BA>AF?OWA>OCM=BS?T=C=CFIAOBYB=ZAQQ=MBAS=G?WU €=BMLBFIABOCM==CFIA>AS=WOT=CYB=ZAQQ_AS=WOT=COQQZIA>LWA>M=B?B=LC>‚?CL?BK~|~ƒU^BO=BF= QF?BF=M>AS=DFIAiOFK=M}ACW=^?BJBA\LOBAQ?>LQFZ=CFB=WYW?C?C>AB=QO=CZ=CFB=WSA?QLBAQFI?F FIAKGABOMK?BAOCQF?WWA>UHIA>AS=WOT=CFA?SXOWWLQAI=QAQF=Z=CFB=WFIA>LQF>LBOCP>AS=UEFB?X X?>>WAQXOWWBAS?OCOCYW?ZAFIB=LPIZ=CQFBLZT=C?W=CPFIAYABOSAFAB=MFIAMACZOCPF=Z=CFB=W >OBF]SL>MB=SWA?GOCPFIAQOFAU





 








Page G-1.70
 












!"
#$%&'()*+%%&%,-+%+,$(./'(01$(%2+*&3'(%&+4&5&6&'%
789:
;<
:;=9:;
>?@@A($+0B*5C.#D&0$EFF.G+*%D02($$H.2IJK@JL
MN@FOKF?PQF?KRASTUV'W
XYZ[\]^_^^[`]ab`cdaefg[feh`fifejfck
l$+(%-'($
A1&6$W+&*+%C+%m3&*$60(+%6W&00$Cn&01&0+($V'%3&C$%0&+*+%C&%0$%C$C6'*$*m3'(01$D6$'301$&%C&5&CD+*'($%0&0m0'n1'W01$m+($+CC($66$CUoB$60p$+*0'(qB('H$( )(',(+WoA1$/+0&'%+*6r?F??./+0&'%+*I66'V&+0&'%'3T'W$BD&*C$(6U 




 








Page G-1.71
440 University Drive – Exhibit C: Conditions of Approval PAGE: 1 of 2
LOCATION: 440
University Drive
PROJECT NUMBER:

PLN2022-00050
APPLICANT: Thomas
James Homes
OWNER: Thomas James
Homes
PROJECT CONDITIONS:

1. The use permit shall be subject to the following standard conditions:
a. The applicant shall be required to apply for a building permit within one year from the date of approval (by February 6, 2024) for the use permit to remain in effect. b. Development of the project shall be substantially in conformance with the plans prepared by Dahlin Group Architecture consisting of 22 plan sheets, dated received January 19, 2023 and approved by the Planning Commission on February 6, 2023, except as modified by the conditions contained herein, subject to review and approval of the Planning Division. c. Prior to building permit issuance, the applicant shall comply with all Sanitary District, Menlo Park Fire Protection District, and utility companies’ regulations that are directly applicable to the project.
d. Prior to building permit issuance, the applicant shall comply with all requirements of the Building Division, Engineering Division, and Transportation Division that are directly applicable to the project.
e. Prior to building permit issuance, the applicant shall submit a plan for any new utility installations or upgrades for review and approval by the Planning, Engineering and Building Divisions. All utility equipment that is installed outside of a building and that cannot be placed underground shall be properly screened by landscaping. The plan shall show exact locations of all meters, back flow prevention devices, transformers, junction boxes, relay boxes, and other equipment boxes.
f. Simultaneous with the submittal of a complete building permit application, the applicant shall submit plans indicating that the applicant shall remove and replace any damaged and significantly worn sections of frontage improvements. The plans shall be submitted for review and approval of the Engineering Division.
g. Simultaneous with the submittal of a complete building permit application, the applicant shall submit a Grading and Drainage Plan for review and approval of the Engineering Division. The Grading and Drainage Plan shall be approved prior to the issuance of grading, demolition or building permits.
h. Heritage trees in the vicinity of the construction project shall be protected pursuant to the Heritage Tree Ordinance and the arborist report prepared by California Tree and Landscape Consulting, Inc. dated August 30, 2022.
i. Prior to building permit issuance, the applicant shall pay all fees incurred through staff time spent reviewing the application.
j. The applicant or permittee shall defend, indemnify, and hold harmless the City of Menlo Park or its agents, officers, and employees from any claim, action, or proceeding against the City of Menlo Park or its agents, officers, or employees to attack, set aside, void, or annul an approval of the Planning Commission, City Council, Community Development Director, or any other department, committee, or agency of the City concerning a development, variance, permit, or land use approval which action is brought within the time period provided for in any applicable statute; provided, however, that the applicant’s or permittee’s duty to so defend, indemnify, and hold harmless shall be subject to the City’s promptly notifying the applicant or permittee of any said claim, action, or proceeding and the City’s full cooperation in the applicant’s or permittee’s defense of said claims, actions, or proceedings.

2. The use permit shall be subject to the following conditions:





 








Page G-1.72
440 University Drive – Exhibit C: Conditions of Approval PAGE: 2 of 2
LOCATION: 440
University Drive
PROJECT NUMBER:

PLN2022-00050
APPLICANT: Thomas
James Homes
OWNER: Thomas James
Homes
a. Simultaneous with the submittal of a complete building permit application, the Applicant shall revise the elevation drawings to indicate the stairwell window will have obscured glass, subject to review and approval of the Planning Division





 








Page G-1.73
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov Planning Commission

REGULAR MEETING DRAFT EXCERPT MINUTES
Date: 2/6/2023
Time: 7:00 p.m.

Location: Zoom.us/join – ID# 862 5880 9056 and
City Council Chambers
751 Laurel St., Menlo Park, CA 94025
A. Call To Order
Acting Chair Cynthia Harris called the meeting to order at 7:00 p.m.

B. Roll Call

Present: Andrew Barnes, Linh Dan Do, Cynthia Harris (Acting Chair), Henry Riggs, Jennifer Schindler, Michele Tate
Staff: Corinna Sandmeier, Acting Principal Planner; Chris Turner, Associate Planner G2. Consider and adopt a resolution to approve a use permit to demolish an existing one-story, singlefamily residence, and construct a new two-story, single-family residence on a substandard lot with regard to minimum lot width and area in the R-1-U (Single Family Urban Residential) zoning district, at 440 University Drive. The project includes an attached accessory dwelling unit (ADU), which is a permitted use not subject to discretionary review; determine this action is categorically exempt under CEQA Guidelines Section 15303’s Class 3 exemption for new construction or conversion of small structures. (Staff Report #23-010-PC)
Associate Planner Chris Turner reported no updates to the published staff report.

Anna Felver, Thomas James Homes, applicant, spoke on behalf of the project.

Acting Chair Harris opened the public hearing.

Public Comment:
• Elizabeth Houck spoke against the project due to concerns about privacy impacts.

Acting Chair Harris closed the public hearing.

The Commission discussed stairwell glazing and potential shade impacts.

Commissioner Riggs moved to approve the item with the addition of obscure glazing on the stairwell.

Commissioner Schindler seconded the motion.

ACTION: Motion and second (Riggs/Schlinder) to adopt a resolution to approve a use permit to demolish an existing one-story, single-family residence, and construct a new two-story, single-family residence on a substandard lot with regard to minimum lot width and area in the R-1-U (Single ATTACHMENT E Page G-1.74
Planning Commissions Regular Meeting Excerpt Minutes – 440 University Drive February 6, 2023

Page 2 ends

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov Family Urban Residential) zoning district, at 440 University Drive with the following modification; passes 4-0 with Commissioners Barnes and Tate abstaining.

Add Condition 2a: Simultaneous with the submittal of a complete building permit application, the Applicant shall revise the elevation drawings to indicate the stair well window will have obscured glass, subject to review and approval of the Planning Division.

Page G-1.75

ATTACHMENT F
Page G-1.76
Page G-1.77
Library and Community Services
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov

STAFF REPORT
City Council
Meeting Date: 4/4/2023
Staff Report Number: 23-087-CC
Regular Business: Provide direction on the proposed programming plan elements for the Menlo Park Community
Campus
Recommendation
City staff recommends that City Council review Menlo Park Community Campus (MPCC) proposed programming plan elements that have been developed over the past several months with robust community input, including several consultations with a working group of Belle Haven neighborhood residents and stakeholders convened by the MPCC ad hoc subcommittee. City staff requests City Council feedback, direction, and confirmation of the proposed programming plan elements at this juncture in the planning process, and in advance of preparing the MPCC staffing, operations, and more specific programming proposal for City Council review and authorization in the context of the upcoming fiscal year 2023-24 budget deliberations.

Policy Issues
City Council provides policy direction to the city manager regarding services to the Menlo Park community; allocates resources to support City services and capital projects; reviews and approves staffing and budget proposals; and sets prioritization for the use of City resources to serve the community. City Council has identified the MPCC project as one of the City’s top priorities.

Background
City Council created the Menlo Park Community Campus ad hoc subcommittee (MPCC Subcommittee) to work with City staff and the community on the MPCC project. The MPCC Subcommittee is currently comprised of Vice Mayor Taylor and City Councilmember Nash.

The MPCC Subcommittee convened a working group of Belle Haven neighborhood residents and stakeholders (MPCC working group) to support and advise the subcommittee’s work.

A project webpage was created (Attachment A) to make MPCC project information readily accessible to the public, including the option to subscribe (Attachment B) to receive project updates and announcements by email or text message.

On April 12, 2022, the City Council reviewed an informational report containing preliminary operational planning milestones and existing City Council policy statements to help provide guidance for the prioritization of services in the MPCC (Attachment C.)
On May 24, 2022, City Council reviewed an informational item containing a report from the MPCC Subcommittee and working group with initial programming ideas and recommendations, and a preliminary draft resident survey related to programs in the new center (Attachment D.) AGENDA ITEM H-1 Page H-1.1
Staff Report #: 23-087-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov On June 22, 2022, the Library Commission (LC) and Parks and Recreation Commission (PRC) convened a joint study session to review operational planning for the MPCC and a report from the MPCC Subcommittee and working group with initial programming ideas and recommendations (Attachment E.) On September 13, 2022, City Council convened a study session to review MPCC project updates including the results of a resident survey to gain insight into residents’ needs and interests related to recreation and community programming in the MPCC (Attachment F.)
On September 28, 2022, the PRC reviewed MPCC project updates and the results of the resident recreation and community programs survey (Attachment G.) On January 25, 2023, the PRC and LC convened a joint study session to review MPCC programming considerations, including a presentation from the Youth Advisory Committee about potential makerspace programs (Attachment H.)
On March 6, 2023, the LC reviewed MPCC programming – library collections (Attachment I.) On March 22, 2023, the PRC and LC convened a joint study session to review MPCC proposed programming plan elements (Attachment J.)
Analysis
The draft MPCC proposed programming plan elements outlined in this report have been developed with robust community input over the past several months, including consultation with the MPCC Subcommittee and MPCC working group, the LC and PRC, and with insights from a citywide survey of Menlo Park residents. Staff is seeking City Council direction to confirm or modify the proposed programming plan elements outlined later in this report. Upon receiving City Council’s guidance and direction, these plan elements will serve as the foundation for developing a detailed budget proposal for MPCC staffing, operations, and programming that will be presented to City Council for review and authorization in the context of the upcoming fiscal year 2023-24 budget deliberations.

The remainder of this report’s Analysis section provides an outline of the MPCC proposed programming plan elements. City staff seeks City Council’s guidance and input at this juncture in the planning process, including but not limited to the following considerations, in no particular priority order:

1. Do the proposed programming plan elements outlined in this report align with City Council’s vision and expectations for programming in the new MPCC facility?

2. Are there additional programming elements City Council would like included in the programming plan?

3. Do the statements about who the MPCC will serve and how programs and services will be prioritized in the MPCC meet City Council’s expectations for the new facility? Tentative programming and staffing plan development timeline All dates are tentative and subject to change. In addition, it is anticipated that MPCC Subcommittee and MPCC working group meetings will also occur at least once per month in April, May and June, and will follow a similar sequence of topics and focus areas as outlined below:
• April 4 – City Council review MPCC proposed programming plan elements • April 26 – PRC and LC joint meeting at Belle Haven Branch Library – MPCC programming plan, facility use policies, resident and neighborhood prioritization policy • May 9 – City Council informational update - Preliminary staffing, operations, and programming plan proposal
Page H-1.2
Staff Report #: 23-087-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov • May 15 – LC review programming plan details with focus on public library, youth center, makerspace, teen zone, senior center, social services
• May 24 – PRC review programming plan details with focus on gymnasium, aquatics center, recreation programs, facility rentals, athletic field, outdoor racquet sports • June 1 – City Council budget workshop fiscal year 2023-24. The library and community services and public works departments’ budgets will include budget proposals for staffing, programming, and operations in the MPCC facility.
• June 13 – City Council budget public hearing fiscal year 2023-24. • June 27 – City Council fiscal year 2023-24 budget adoption.

Resident survey - recreation and community programs
At City Council’s direction, a city wide survey was developed with input from the MPCC Subcommittee and working group, PRC, LC, and City Council. The survey opened June 13, 2022 and closed August 10, 2022 and was distributed in paper and electronic formats, in English and Spanish. The survey had over 900 respondents. The complete survey results were presented to City Council on September 13, 2022.

The resident survey provided valuable insight to the Menlo Park community’s needs and desires related to recreation and community programs, including the following key takeaways related to MPCC programming.

The list is numbered for convenience only, in no particular order or priority.

A. Prioritize the program elements that survey respondents rated with the highest relative importance B. Include programs that aren’t currently offered on a regular basis, but were rated with high importance by survey respondents, for example:
• Homework help for children and teens after school
• Job skills / job readiness / job seeker resources and training • Food insecurity advice and support
• Health care navigation and support
• Social services
C. Prioritize programs and classes that are free or have discounted fees for Menlo Park residents.

D. Deprioritize programs that primarily attract participants from outside Menlo Park, and/or that survey respondents rated with low relative importance
E. Prioritize casual and drop-in play opportunities for children and families, especially Menlo Park residents Who the MPCC will serve
The following statement regarding the intended users of the MPCC facility was developed with input from the MPCC Subcommittee and MPCC working group: “Programs and services in the MPCC will reflect and prioritize the people for whom this facility is being created: Menlo Park residents, specifically Belle Haven neighborhood residents, and in particular, long time Belle Haven residents who relied heavily on the services in the previous center. The MPCC facility can and should serve these residents even more meaningfully, with even greater priority, and with even more responsiveness, inclusion, and belonging than existed in the previous center.”
Guiding principles
The following guiding principles for services and programs in the MPCC are derived from statements in the City of Menlo Park’s cost recovery policy, and were developed with input from the MPCC Subcommittee and MPCC working group: “The City of Menlo Park provides services and infrastructure that contribute to quality-of-life for all Menlo Park residents. In so doing, the City strives to balance the resources and requirements of each area of the city in an equitable manner for all residents, in all neighborhoods of the City. The City of Menlo Park prioritizes social justice in decisions that affect residents’ lives: The fair, just Page H-1.3
Staff Report #: 23-087-CC

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov and equitable management of all institutions serving the public directly or by contract; the fair, just and equitable distribution of public services and implementation of public policy; the commitment to promote inclusion, fairness, justice, and equity in the formation of public policy; and creating a healthy environment and nutritional options in City programs.”
Working group’s general vision for the MPCC facility
The MPCC working group provided valuable suggestions and insight to a neighborhood-oriented vision and aspirations for the MPCC facility.
• New, different, and fresh approach to programs and services • Desire to have a local hiring and procurement preference prioritizing the Bayfront, Citywide, and any displaced residents, businesses, staff
• Public transparency into the MPCC programming and operations budget • Ongoing comparison to current and prior community center activities in Menlo Park as well as surrounding communities
• Robust outreach to people lacking technology access or skills, and monolingual Spanish speakers • Recognition and awards to people in community who created the vision and dialogue that led to the creation of the MPCC.

Working group’s proposed operational and policy elements The MPCC working group offered helpful ideas, suggestions, and requests related to the day-to-day operational aspects of the MPCC facility.
• MPCC service counter to provide access and referrals to general city services, assistance, city information, community resources/bulletin board
• Medical training for staff including CPR (cardiopulmonary resuscitation) • Attendant for athletic facilities (gymnasium, fitness center, locker rooms) to keep space clean and sanitary
• Roles and rules for public spaces – library, makerspace, etc. • Supervision of children, safety standards, noise levels • Update relevant policies to prioritize neighborhood-oriented and resident-oriented services and access, for example, the athletic field use policy, facility rental policy, cost recovery policy, facility use and behavior policy, et al.
• Neighborhood and citywide priority use of Kelly Park athletic field and tennis courts • Re-examine the instructional class fee structure and assess the effectiveness of fee scholarship programs with the goal of lowering or removing financial barriers that may prevent some residents from accessing the full experience of MPCC programs and services. • Focus the MPCC’s services and programs on Menlo Park residents and particularly the local Bayfront community (as opposed to renting out or prioritizing access to nonresidents for cost recovery purposes.)

Proposed programming plan elements
What follows are lists of proposed programming plan elements in the MPCC, organized by major service delivery categories. The lists are by no means comprehensive, but are intended to reflect the MPCC programming needs, desires, and prioritization of Menlo Park residents, especially Belle Haven neighborhood residents, as informed by City Council, the MPCC Subcommittee and working group, the LC and PRC, and the resident survey.

Library and makerspace
• Menlo Park residents, especially Belle Haven neighborhood residents, will have priority access to Page H-1.4
Staff Report #: 23-087-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov popular, up-to-date, diverse, educational, informative, inspiring, resourceful, useful, interesting, entertaining, and helpful library materials
• Library materials will focus on and reflect the interests, needs, culture, and history of the Menlo Park community, especially the Belle Haven neighborhood.
• Browsing collection – focused on neighborhood access and availability • Storytimes and early literacy support
• Technology access
• Afterschool homework support center
• English language conversation club (for learners of English) • Librarian help hours (learning library skills and systems, etc.) • Book discussion groups, including multigenerational clubs • Teen space - including leisure and social space
• Makerspace - large tables for workstations, 3D printer • Pottery class including kiln
• Sewing classes including sewing machines
• Wood carving
Aquatics center
• Aquatics programs will be focused on and will prioritize the needs of Menlo Park residents, especially Belle Haven neighborhood residents
• Aquatics programs in MPCC will have equivalent quality and variety as programs at Burgess Pool • Participation fees shall not be used to create barriers to access for Menlo Park residents, especially Belle Haven neighborhood residents. Some aquatics programs will be offered to residents with no participation fee or at steeply discounted rates to ensure that financial barriers do not prevent access for residents • Adaptive swimming for people with disabilities
• Senior pool exercise class
• Lots of free swim time in the more heated pool with ramp • Inclusion of infant and toddlers-age appropriate activities for all • Implementation of City Council’s direction for aquatics programs in the recent request for proposals Athletic facilities
• Athletic facilities (gymnasium, fitness center, movement studio), programs will be focused on and will prioritize the needs of Menlo Park residents, especially Belle Haven neighborhood residents • Athletic facility programs in MPCC will have equivalent quality and variety as programs at Arrillaga Family Recreation Center and Arrillaga Family Gymnasium • Participation fees shall not be used to create barriers to access for Menlo Park residents, especially Belle Haven neighborhood residents. Some athletic facility programs will be offered to residents with no participation fee or at steeply discounted rates to ensure that financial barriers do not prevent access for residents
• Strength training for women
• Strength/balance training for seniors
• Gymnastics classes for kids with special needs
• Drop-in play for residents
• League play focused on residents
• Fitness center – safe, state of the art equipment, roomy Page H-1.5
Staff Report #: 23-087-CC

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov • Teen fitness offering inclusive of teens with disabilities • Movement studio – intentionally designed
• Functional exercise with cardio
Educational opportunities
• Educational programs will be focused on and will prioritize the needs of Menlo Park residents, especially Belle Haven neighborhood residents
• Educational programs in MPCC will have equivalent quality and variety as programs at Main Library, Arrillaga Family Recreation Center, and other City facilities. • Participation fees shall not be used to create barriers to access for Menlo Park residents, especially Belle Haven neighborhood residents. Many educational programs will be offered to residents with no participation fee or at steeply discounted rates to ensure that financial barriers do not prevent access for residents
• Coding, engineering, science (ongoing classes)
• Health and nutrition classes for all
• Basic life skills - budgeting, how to manage money, job seeking (resumes, interview skills, dress for success), social awareness
• College programming
• Driving school
• Computer lab
• Environmental education and impact - storyboards/classes based on MPCC sustainability • Bike repair station/classes (example: Live In Peace organization) • Cooking classes
• Teaching garden
• Adaptive recreation classes including mixed media art, karate, fun fitness, cooking, dance.

Facility reservations
• Prioritize resident access to facility reservations
• Prioritize local nonprofit access to facility reservations • Event hall (dividable) and prep kitchen
• Flexible classroom
• Conference room
• Makerspace
• Gymnasium
Instructional classes
• Classes will be focused on and will prioritize the needs of Menlo Park residents, especially Belle Haven neighborhood residents
• Classes in MPCC will have equivalent quality and variety as classes at Arrillaga Family Recreation Center
• Participation fees shall not be used to create barriers to access for Menlo Park residents, especially Belle Haven neighborhood residents. Some classes will be offered to residents with no participation fee or at steeply discounted rates to ensure that financial barriers do not prevent access for residents • Youth classes (for example, dance, martial arts, STEM education and enrichment, sports camps, language acquisition)
• Adult classes (for example, health/fitness, dance, arts/crafts, tennis/pickleball lessons) Page H-1.6
Staff Report #: 23-087-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov Senior center
• Senior nutrition programs (including daily lunch service and grocery distribution) • Companionship and social programs
• Door-to-door accessible transportation
• Makerspace - large tables for traditional arts and crafts (pottery class including kiln, sewing classes including sewing machines, painting, drawing, crafts)
• Intro to Spanish classes
• Technology access and support
• Dance, yoga, chair exercises
• Meditation and mind exercise
• Culture and travel programs
• Social events (Dia de Los Muertos, Thanksgiving, Black History Month celebration, etc.) • Provide a wide range of support for seniors through collaborations with local nonprofits, educational partners and businesses (Second Harvest Food Bank, Foothill College, Peninsula Volunteers, etc.) • Social services / health and wellness support and referral.

Youth center (school age child care)
• Afterschool youth development programs
• Summer youth development programs
• Beechwood School priority access
• Transportation for students
• A safe and healthy care and learning environment so parents/caregivers can go to work knowing their children are learning and growing and having fun
• Daily enrichment activities (Arts and crafts, STEM Activities, reading programs, homework assistance, team building and socialization)
• Weekly enrichment activities (swimming and water play, field trips, cooking projects, featured guests) • Synergy with classes offered in other areas of the MPCC such as dance class, swimming lessons, Spanish instruction, homework tutoring and other programs offered to school age youth.

MPCC Subcommittee and working group roster
City Council created the MPCC Subcommittee (Vice Mayor Taylor and City Councilmember Nash) to work with City staff and the community on the MPCC project. The MPCC Subcommittee created a working group of Menlo Park residents to support and advise the subcommittee’s work. City staff have met with the MPCC Subcommittee and MPCC working group several times over the past several months, and their input has been exceptionally insightful and valuable in the development of the proposed programming plan elements.

The MPCC working group members represent interests such as Bayfront neighborhoods, stakeholder constituencies, diverse user ages and abilities, and city commissions. The current roster includes: Rachel Bickerstaff, Rose Bickerstaff, Sheryl Bims, Mayrin Bunyagidj, Jacqui Cebrian, David Erhart, Susan Erhart, Israel Harris, Jennifer Johnson, Pam Jones, Tim R., Michele Tate, Tracie V., Shontelle W., and Juan Salazar.

Impact on City Resources
As part of the new center opening, it is anticipated that existing services that are currently housed in interim locations will be relocated to the new center; some services that were suspended or reduced during the MPCC construction and/or due to pandemic impacts could be restored to pre-construction/pre-pandemic Page H-1.7
Staff Report #: 23-087-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov levels; and some service level enhancements could be necessary or desired in order to operate the center in the manner and capacity envisioned by the City Council and the community. The projected cost impacts of operating the new center are currently in development, and will be presented to City Council for review and authorization in the context of the fiscal year 2023-24 budget deliberations.

Environmental Review
This report is focused on proposed operational and programming elements in the MPCC, and is not a project within the meaning of the California Environmental Quality Act (CEQA) Guidelines §§15378 and 15061(b)(3) as it will not result in any direct or indirect physical change in the environment.

Public Notice
Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 hours prior to the meeting. In addition, the City sent electronic notices directly to project email and text update subscribers from the project page (Attachment B.) Attachments
A. Hyperlink – Project page: menlopark.gov/communitycampus B. Hyperlink – Subscription page: menlopark.gov/subscribe C. Hyperlink – April 12, 2022 City Council agenda: menlopark.gov/files/sharedassets/public/agendas-andminutes/city-council/2022-meetings/agendas/20220412-city-council-amended-agendapacket.pdf#page=531 D. Hyperlink – May 24, 2022 City Council agenda: menlopark.gov/files/sharedassets/public/agendas-andminutes/city-council/2022-meetings/agendas/20220524-city-council-agenda-packet.pdf#page=569 E. Hyperlink – June 22, 2022 PRC and LC joint meeting agenda:
menlopark.gov/files/sharedassets/public/agendas-and-minutes/parks-and-recreation-commission/2022- meetings/agendas/20220622-library-commissiona-and-parks-and-recreation-commission-joint-agendapacket.pdf#page=3 F. Hyperlink – September 13, 2022 City Council agenda:
menlopark.gov/files/sharedassets/public/agendas-and-minutes/city-council/2022- meetings/agendas/20220913-city-council-agenda-packet.pdf#page=6 G. Hyperlink – September 28, 2022 PRC agenda: menlopark.gov/files/sharedassets/public/agendas-andminutes/parks-and-recreation-commission/2022-meetings/agendas/20220928-parks-and-recreationcommission-agenda-packet.pdf#page=17 H. Hyperlink – January 25, 2023 PRC and LC joint meeting agenda:
menlopark.gov/files/sharedassets/public/agendas-and-minutes/parks-and-recreation-commission/2023- meetings/agendas/20230125-library-and-parks-and-recreation-commission-agenda-packet.pdf#page=3 I. Hyperlink – March 6, 2023 LC agenda: menlopark.gov/files/sharedassets/public/agendas-andminutes/library-commission/2023-meetings/agendas/20230306-library-commission-agendapacket.pdf#page=3 J. Hyperlink – March 22, 2023 PRC and LC joint meeting agenda:
menlopark.gov/files/sharedassets/public/agendas-and-minutes/parks-and-recreation-commission/2023- meetings/agendas/20230322-parks-and-recreation-commission-and-library-commission-agendapacket.pdf#page=5 Report prepared by:

Natalya Jones, Library and Community Services Supervisor Page H-1.8
Staff Report #: 23-087-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov Rondell Howard, Interim Assistant Community Services Director Nick Szegda, Assistant Library Services Director
Sean S. Reinhart, Library and Community Services Director Page H-1.9
Administrative Services
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov

STAFF REPORT
City Council
Meeting Date: 4/4/2023
Staff Report Number: 23-070-CC
Regular Business: Receive and file report on labor relations and receive public input on upcoming labor
negotiations with Service Employees International
Union Local 521 and American Federation of State,
County and Municipal Employees Local 829
Recommendation
Receive and file report on employee compensation and receive public input on upcoming labor negotiations with Service Employees International Union Local 521 (SEIU) and American Federation of State, County, and Municipal Employees Local 829 (AFSCME.)
Policy Issues
This report is prepared in accordance with City Council Procedure #CC-11-0001, public input and outreach regarding labor negotiations (Attachment A.)
Background
The collective bargaining agreements for non-sworn frontline personnel (SEIU) and non-sworn supervisors (AFSCME) both have terms of July 1, 2021, through June 30, 2023. Pursuant to best labor-management practices, it is time to open negotiations on successor agreements. SEIU represents 74 classifications with 168 full-time positions funded in the fiscal year 2022-23 budget. AFSCME represents 22 classifications with approximately 41 full-time, funded positions.

Analysis
This report transmits personnel and process information to members of the City Council, the subject bargaining units, and the public to inform upcoming labor negotiations with SEIU and AFSCME. If the parties cannot agree on a successor agreement, the terms of the existing agreement remain until modified pursuant to State-mandated impasse procedures or successful negotiation of a successor agreement.

Labor contract negotiations are governed by the Meyers-Milias-Brown Act (MMBA), Government Code section 3500. MMBA requires that local agencies meet and confer in good faith regarding wages, hours, and other terms and conditions of employment with representatives of recognized collective bargaining units. MMBA further requires that the City fully consider proposals made by collective bargaining unit representatives before arriving at a determination of policy or course of action.

Negotiable items with direct costs
Table 1 provides baseline personnel expense categories for each employee group, including SEIU, AFSCME, Menlo Park Police Officers’ Association (POA), Menlo Park Police Sergeants’ Association (PSA), AGENDA ITEM H-2 Page H-2.1
Staff Report #: 23-070-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov and unrepresented management and confidential employees to help quantify the financial impacts of desired changes by either negotiating party. Confidential employees are generally provided the same benefits as AFSCME. All items are open to negotiations.

Attachment B contains detailed expenditure breakdowns for SEIU and AFSCME. Attachments C and D provide web links to the City’s labor agreements and salary schedule. Attachment E provides medical benefit plan information and City contributions. The elements of each column in Table 1 are defined in greater detail below:

Full-time equivalents. There are 285.5 authorized full-time equivalents (FTEs) in the fiscal year 2022-23 budget, not including the five City Councilmembers. FTE is defined as one individual working 40 hours per week or receiving a flat salary. A position scheduled to work less than 40 hours per week is shown as a fraction of 1.0. For example, a position scheduled to work 30 hours per week is considered 0.75 FTE. Temporary employees, employees working fewer than 20 hours per week or 960 hours per year, only receive benefits mandated by State or Federal law.

Base pay. Base pay is the pensionable wage for all budgeted FTEs, filled or vacant. Base pay for each employee may change due to negotiated cost-of-living adjustments (COLAs) or annual merit-based performance adjustments.

Special pays. The City provides special pays to POA and PSA personnel that are added to pensionable wages. Examples include longevity, shift differentials, and Police Officer Standards and Training (POST) certification. SEIU and AFSCME do not have special pays.

Table 1: Fiscal Year 2022-23 baseline personnel costs by group Group FTEs
Base
pay
Special
pays
Allowances Retirement
Health
and
welfare
Other
fringe
benefits
Total
Represented non-sworn personnel
SEIU 168 15,276,900 n/a 12,854 3,194,323 3,781,996 778,171 23,044,245 AFSCME 41 5,497,003 n/a n/a 1,222,259 948,680 276,098 7,944,040 Subtotal 209 20,773,903 - 12,854 4,416,582 4,730,677 1,054,269 30,988,285 Represented sworn personnel
POA 36 4,901,787 453,619 41,259 1,618,122 707,141 236,173 7,958,102 PSA 9 1,534,167 234,823 9,360 941,103 203,113 78,012 3,000,579 Subtotal 45 6,435,954 688,442 50,619 2,559,225 910,254 314,186 10,958,680 Unrepresented
Confidential 6.5 628,501 n/a n/a 133,468 179,997 37,899 979,865 Management 25 4,484,762 n/a 155,526 1,212,206 949,152 240,095 7,041,741 Subtotal 31.5 5,113,264 - 155,526 1,345,674 1,129,149 277,994 8,021,606 Grand total 285.5 32,323,121 688,442 218,999 8,329,334 6,770,080 1,646,448 49,968,571 Page H-2.2
Staff Report #: 23-070-CC

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov Allowances. Allowances are not pensionable wages and are provided to offset employee costs incurred in the exercise in their duties. Example allowances include maintaining uniforms for police officers, and providing transportation allowance for unrepresented management personnel, instead of maintaining a dedicated City vehicle for their use.

Retirement. Retirement includes CalPERS costs incurred by the employer for the defined benefit pension plan. All regular employees represented or unrepresented are enrolled in CalPERS per California Public Employees’ Retirement Law Chapter 3 Article 1, and do not earn Social Security credits while working for Menlo Park.

Attachment B contains detailed expenditure breakdowns for SEIU and AFSCME. Of particular note are the cost differentials between the various pension tiers. As a result of Measure L (November 2010), the City amended its contracts with CalPERS to provide a lower pension benefit to employees hired after a certain date (Tier 2.) Statewide changes in CalPERS also took effect January 1, 2013, to introduce a further decrease in pension benefits for “New” employees hired on or after the effective date. “New” refers to the employee’s tenure in CalPERS, rather than their tenure with an organization. The “New” employees subject to this lower benefit are referred to as Public Employee Pension Reform Act (PEPRA) employees or, at times, Tier 3 employees.

Web links to the most current pension actuarial reports are available in Attachments F through I, and Attachment J provides a web link to CalPERS’ webpage on PEPRA. The “miscellaneous plan” applies to all non-sworn personnel, blending Tiers 1, 2 and PEPRA, and is large enough to require a discrete plan due to the number of active and retired members. The three plans titled “safety plan” are segmented based on benefit level and are pooled with similar small employers offering the same benefit to sworn personnel.

Health and welfare. Health and welfare primarily reflect cafeteria plan contribution for employees to select a medical insurance plan offered by the Public Employee’s Medical and Hospital Care Act (PEMHCA), administered by CalPERS. In addition to medical, this column includes City-paid dental and vision coverages for eligible employees and their dependents.

Other fringe benefits. Other fringe benefits include life insurance, accidental death and dismemberment (AD&D) insurance, Medicare and workers’ compensation insurance.

Negotiable items with indirect costs
In addition to the direct costs outlined above, indirect costs items are also open to negotiation. Either side may seek changes in other factors subject to MMBA, such as paid time off (e.g., holidays), tools and equipment, employee engagement and retention efforts, and professional development opportunities.

Attachment K provides a web link to a Citywide benefits summary by group, which includes a comparison of retirement, health benefits, leaves, special pays, allowances and other fringe benefits.

Roles during labor contract negotiations
The following provides an overview of major roles in the process to promote understanding of the labor contract negotiation process:

City Council. The City Council designates the City’s chief negotiator, authorizes the City’s initial bargaining position, considers proposals made by collective bargaining unit representatives through the chief negotiator, and ultimately approves a successor agreement. City Council receives data, analysis, and recommendations from the city manager and designated City staff. City Council Procedure #CC-11-0001, establishes early release requirements for all matters about labor negotiations. Other than approving the Page H-2.3
Staff Report #: 23-070-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov successor agreement, the City Council may elect to hold all labor negotiations discussions in closed session.

Chief negotiator. The City retains labor attorney Charles Sakai from Sloan Sakai to advise on personnel matters, including on all issues under MMBA and to serve as chief negotiator during labor agreement discussions. Mr. Sakai prepares all proposals, counter-proposals, and tentative agreements and is authorized to execute tentative agreements consistent with negotiating authority granted by City Council.

Mr. Sakai also consults the city manager, or designee, on workplace impacts of proposals, counterproposals and tentative agreements.

City manager. The city manager is responsible for the efficient administration of all City services, and administration of the City Council approved budget. In the negotiations process, the city manager advises City Council and the chief negotiator on management matters subject to MMBA. The city manager also advises on recruitment and retention tools, employee engagement, and emerging trends in regional workforce management. The city manager designates city staff to support the chief negotiator.

Designated city staff. Labor negotiations can be a time-intensive process requiring significant preparation, coordination, analysis and follow-up work. The city manager typically will assign the assistant city manager, administrative services director, human resources manager, and a management analyst to support the process. To the greatest extent possible, information about labor negotiations is limited to individuals authorized by the city manager, such as how a proposal might impact operations.

Collective bargaining unit’s chief negotiator. Each bargaining unit identifies a chief negotiator. The City’s negotiating team commits to communicating only with the bargaining unit’s chief negotiator unless otherwise authorized by the bargaining unit’s chief negotiator.

Collective bargaining unit negotiating team. Each bargaining unit identifies a negotiating team of active City employees to advise their collective bargaining unit’s chief negotiator through the labor contract negotiations process. The negotiating team typically meets amongst itself and is also present during all negotiation meetings.

Negotiations calendar and process
City management will provide City Council with its recommended bargaining position by unit and strategy at their April 25 closed session. Time on the City Council’s tentative agenda is reserved for closed sessions at each regular meeting after that to ensure City Council agenda capacity for labor negotiation conversations.

City Council will provide the City negotiator with direction to engage the units under the MMBA requirement to negotiate successor agreements with recognized employee groups. The first meeting between the two parties typically includes:
• Introductions
• Ground rules for negotiations
• Future meetings and time constraints
• Discussion of material contained in this report
• Discussion of any additional information requests from the bargaining unit • Preliminary discussion of interest areas on both sides At their April 25 closed session, the City’s chief negotiator will provide the City Council with a negotiation strategy and initial bargaining authority recommendation. The chief negotiator will brief the City Council in closed session as necessary after that.

Page H-2.4
Staff Report #: 23-070-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov The following calendar identifies key dates that impact negotiation of successor agreements before the expiration of current agreements.
• March 20 – City staff release report on negotiations with SEIU and AFSCME • April 4 – Members of the public offer their input on the City’s negotiations position for City Council consideration
• April 25 – City Council meets in closed session, confirms negotiating teams, and provides initial bargaining authority to chief negotiator
• April 26 through May 26 – City and SEIU, City and AFSCME negotiate successor agreement • June 1 – Estimated deadline for SEIU and AFSCME membership to ratify tentative successor agreement for effective date of July 1, 2023
• June 13 – Staff release report for ratified tentative successor agreement with SEIU and AFSCME • June 27 – Public meeting for City Council consider ratification of a successor agreement with SEIU and AFSCME effective July 1
Resources available to City Councilmembers
Attachment L, “Understanding the Labor Negotiations Process produced by the Institute for Local Government,“ further describes the roles, process and requirements of labor negotiations.

Impact on City Resources
There are no impacts on City resources as a result of receiving input on this issue. The cost of negotiating each contract is estimated at approximately $30,000, inclusive of the chief negotiator’s fees and internal staff time, at a total estimated cost of $60,000. Additional consulting services may be required depending on the scope of negotiation. City Council will meet in closed session to provide direction to the City’s negotiating team. The negotiators will meet and confer with the SEIU and AFSCME negotiation teams to reach a tentative agreement before the expiration of the current agreements. Once a tentative successor agreement is ready for City Council ratification, the fiscal impact of that tentative agreement will be released 15 days before the City Council vote at a public meeting.

Environmental Review
This action is not a project within the meaning of the California Environmental Quality Act (CEQA) Guidelines §§ 15378 and 15061(b)(3) as it will not result in any direct or indirect physical change in the environment.

Public Notice
Public notification was achieved by posting the report 15 days prior to the City Council meeting of April 4, 2023.

Attachments
A. City Council Procedure #CC-11-0001
B. 2022-23 baseline expenditures costs for SEIU and AFSCME C. Hyperlink – City of Menlo Park labor agreements: menlopark.gov/laboragreements D. Hyperlink – City of Menlo Park salary schedule effective 9/25/2022: menlopark.gov/salaryschedule E. 2023 SEIU and AFSCME health plan choices and City contributions Page H-2.5
Staff Report #: 23-070-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov F. Hyperlink – City of Menlo Park miscellaneous plan CalPERS actuarial valuation report as of June 30, 2021: calpers.ca.gov/docs/actuarial-reports/2021/menlo-park-city-miscellaneous-2021.pdf G. Hyperlink – City of Menlo Park safety plan Tier 1 CalPERS actuarial valuation report as of June 30, 2021: calpers.ca.gov/docs/actuarial-reports/2021/menlo-park-city-safety-2021.pdf H. Hyperlink – City of Menlo Park safety plan Tier 2 CalPERS actuarial valuation report as of June 30, 2021: calpers.ca.gov/docs/actuarial-reports/2021/menlo-park-city-safety-police-second-tier-2021.pdf I. Hyperlink – City of Menlo Park safety plan PEPRA CalPERS actuarial valuation report as of June 30, 2021: calpers.ca.gov/docs/actuarial-reports/2021/menlo-park-city-pepra-safety-police-2021.pdf J. Hyperlink – PEPRA: calpers.ca.gov/page/about/laws-legislation-regulations/public-employees-pensionreform-act K. Hyperlink – Benefits summary by bargaining unit: menlopark.gov/benefitssummary L. Understanding the Labor Negotiations Process produced by the Institute for Local Government Report prepared by:

Marvin Davis, Interim Finance Director
Brittany Mello, Administrative Services Director
Page H-2.6
City of Menlo Park City Council Policy
Department
City Council Page 1 of 1
Effective Date
03/02/2011
Subject
Public Input and Outreach regarding Labor Negotations
Approved by
City Council
03/01/2011
Procedure #
CC-11-0001

PURPOSE
To incorporate public input into the labor negotiations process.

BACKGROUND
The City Council has expressed a desire to improve public communication and outreach on labor relations to the extent reasonably possible.

POLICY
A regular business item shall be placed on a Council agenda in advance of formal labor negotiations that includes an opportunity for the public to comment. At least seven days prior to this meeting, staff shall post a report that contains relevant information on employee salaries and benefits, as well as the methodology used to determine a competitive and appropriate compensation package. As part of this process, a concerted effort shall be made to request public comment on the negotiations parameters.

As a general rule, staff shall engage the services of a labor attorney to participate in formal labor negotiations with bargaining units representing permanent employees.

During labor negotiations, public comment will be provided prior to the entry into closed session to discuss labor negotiations, in accordance with State law. At the conclusion of the closed session, the Council shall report out any action taken, including in the record the individual votes taken and the characterization of the deliberations. In addition, at some point in the negotiations process, staff shall submit a public report to Council that provides a general status of labor negotiations and that allows for public input prior to concluding negotiations.

Staff shall prepare and make public a staff report, at least fifteen calendar days prior to Council consideration of a tentative agreement or implementation resolution for any bargaining unit, that provides full details and costing associated with the recommended action, shall schedule the matter as a regular business item and shall provide an opportunity for the public to comment.

ATTACHMENT A Page H-2.7
Type Total
Salary
Base $14,520,934
Cost-of-living adjustment (COLA) $431,624
Merit $324,342
Salary Total $15,276,900
Allowances
Uniform -
Auto $12,854
Allowances Total $12,854
Retirement
Employer Share: CalPERS Tier 1 $519,849
Employer Share: CalPERS Tier 2 $108,499
Employer Share: CalPERS PEPRA $721,784
Employee Share: Cal PERS Tier 1 ($246,139)
Employee Share: CalPERS Tier 2 ($66,305)
Employee Share: CalPERS PEPRA ($627,609)
Unfunded: CalPERS Tier 1 $728,028
Unfunded: CalPERS Tier 2 $196,117
Unfunded: CalPERS PEPRA $1,860,098
Retirement Total $3,194,323
Healthcare
Medical $3,444,097
Dental & Vision $337,899
Healthcare Total $3,781,996
Other benefits
Life, ADD, LTD $106,969
Medicare $221,578
Workcomp $449,624
Other benefits Total $778,171
SEIU Total $23,044,245
Table 1: FY 2022-23 budgeted SEIU personnel costs
ATTACHMENT B Page H-2.8
Type Total
Salary
Base $5,286,882
Cost-of-living adjustment (COLA) $158,606
Merit $51,515
Salary Total $5,497,003
Allowances
Uniform -
Auto -
Allowances Total -
Retirement
Employer Share: CalPERS Tier 1 $308,888
Employer Share: CalPERS Tier 2 $82,651
Employer Share: CalPERS PEPRA $152,197
Employee Share: Cal PERS Tier 1 ($131,295)
Employee Share: CalPERS Tier 2 ($45,343)
Employee Share: CalPERS PEPRA ($119,045)
Unfunded: CalPERS Tier 1 $432,586
Unfunded: CalPERS Tier 2 $149,396
Unfunded: CalPERS PEPRA $392,224
Retirement Total $1,222,259
Healthcare
Medical $864,572
Dental & Vision $84,108
Healthcare Total $948,680
Other benefits
Life, ADD, LTD $38,479
Medicare $79,707
Workcomp $157,912
Other benefits Total $276,098
AFSCME Total $7,944,040
Table 2: FY 2022-23 budgeted AFSCME personnel costs
Page H-2.9
Health Plan Premiums: Bay Area Region
Amounts in green = additional amount available to you to put toward cafeteria options Amounts in (red) = your out-of-pocket expense
Cash in lieu = $367 monthly
2023 SEIU – Full-time (40 hour) employees
Health plan
Employee only Employee + 1 Employee +2 or more
Monthly
premium
After $1019.43
City contribution
Monthly
premium
After $1921.11
City contribution
Monthly
premium
After $2493.94
City contribution
Anthem Blue Cross Select HMO $ 1,128.83 $ (109.40) $ 2,257.66 $ (336.55) $ 2,934.96 $ (441.02) Anthem Blue Cross Traditional HMO $ 1,210.71 $ (191.28) $ 2,421.42 $ (500.31) $ 3,147.85 $ (653.91) Blue Shield Access+ $ 1,035.21 $ (15.78) $ 2,070.42 $ (149.31) $ 2,691.55 $ (197.61) Health Net SmartCare $ 1,174.50 $ (155.07) $ 2,349.00 $ (427.89) $ 3,053.70 $ (559.76) Kaiser Permanente California $ 913.74 $ 105.69 $ 1,827.48 $ 93.63 $ 2,375.72 $ 118.22 Western Health Advantage $ 760.17 $ 259.26 $ 1,520.34 $ 400.77 $ 1,976.44 $ 517.50 PERS Gold $ 825.61 $ 193.82 $ 1,651.22 $ 269.89 $ 2,146.59 $ 347.50 PERS Platinum $ 1,200.12 $ (180.69) $ 2,400.24 $ (479.13) $ 3,120.31 $ (626.37)

ATTACHMENT E
Page H-2.10
Health Plan Premiums: Bay Area Region
Amounts in green = additional amount available to you to put toward cafeteria options Amounts in (red) = your out-of-pocket expense
Cash in lieu = $275.25 monthly
2023 SEIU – Part-time (30 hour) employees
Health plan
Employee only Employee + 1 Employee +2 or more
Monthly
premium
After $764.57 City
contribution
Monthly
premium
After $1440.83
City contribution
Monthly
premium
After $1870.46
City contribution
Anthem Blue Cross Select HMO $ 1,128.83 $ (364.26) $ 2,257.66 $ (816.83) $ 2,934.96 $ (1,064.50) Anthem Blue Cross Traditional HMO $ 1,210.71 $ (446.14) $ 2,421.42 $ (980.59) $ 3,147.85 $ (1,277.39) Blue Shield Access+ $ 1,035.21 $ (270.64) $ 2,070.42 $ (629.59) $ 2,691.55 $ (821.09) Health Net SmartCare $ 1,174.50 $ (409.93) $ 2,349.00 $ (908.17) $ 3,053.70 $ (1,183.24) Kaiser Permanente California $ 913.74 $ (149.17) $ 1,827.48 $ (386.65) $ 2,375.72 $ (505.26) Western Health Advantage $ 760.17 $ 4.40 $ 1,520.34 $ (79.51) $ 1,976.44 $ (105.99) PERS Gold $ 825.61 $ (61.04) $ 1,651.22 $ (210.39) $ 2,146.59 $ (276.13) PERS Platinum $ 1,200.12 $ (435.55) $ 2,400.24 $ (959.41) $ 3,120.31 $ (1,249.86) Page H-2.11
Health Plan Premiums: Bay Area Region
Amounts in (red) = your out-of-pocket expense
Cash in lieu = $183.50 monthly
2023 SEIU – Part-time (20 hour) employees
Health plan
Employee only Employee + 1 Employee +2 or more
Monthly
premium
After $509.71 City
contribution
Monthly
premium
After $960.55
City contribution
Monthly
premium
After $1246.97
City contribution
Anthem Blue Cross Select HMO $ 1,128.83 $ (619.12) $ 2,257.66 $ (1,297.11) $ 2,934.96 $ (1,687.99) Anthem Blue Cross Traditional HMO $ 1,210.71 $ (701.00) $ 2,421.42 $ (1,460.87) $ 3,147.85 $ (1,900.88) Blue Shield Access+ $ 1,035.21 $ (525.50) $ 2,070.42 $ (1,109.87) $ 2,691.55 $ (1,444.58) Health Net SmartCare $ 1,174.50 $ (664.79) $ 2,349.00 $ (1,388.45) $ 3,053.70 $ (1,806.73) Kaiser Permanente California $ 913.74 $ (404.03) $ 1,827.48 $ (866.93) $ 2,375.72 $ (1,128.75) Western Health Advantage $ 760.17 $ (250.46) $ 1,520.34 $ (559.79) $ 1,976.44 $ (729.47) PERS Gold $ 825.61 $ (315.90) $ 1,651.22 $ (690.67) $ 2,146.59 $ (899.62) PERS Platinum $ 1,200.12 $ (690.41) $ 2,400.24 $ (1,439.69) $ 3,120.31 $ (1,873.34) Page H-2.12
Health Plan Premiums: Bay Area Region
Amounts in green = additional amount available to you to put toward cafeteria options Amounts in (red) = your out-of-pocket expense
Cash in lieu = $367 monthly
2023 AFSCME – Full-time (40 hour) employees
Health plan
Employee only Employee + 1 Employee +2 or more
Monthly
premium
After $1019.43
City contribution
Monthly
premium
After $1921.11
City contribution
Monthly
premium
After $2493.94
City contribution
Anthem Blue Cross Select HMO $ 1,128.83 $ (109.40) $ 2,257.66 $ (336.55) $ 2,934.96 $ (441.02) Anthem Blue Cross Traditional HMO $ 1,210.71 $ (191.28) $ 2,421.42 $ (500.31) $ 3,147.85 $ (653.91) Blue Shield Access+ $ 1,035.21 $ (15.78) $ 2,070.42 $ (149.31) $ 2,691.55 $ (197.61) Health Net SmartCare $ 1,174.50 $ (155.07) $ 2,349.00 $ (427.89) $ 3,053.70 $ (559.76) Kaiser Permanente California $ 913.74 $ 105.69 $ 1,827.48 $ 93.63 $ 2,375.72 $ 118.22 Western Health Advantage $ 760.17 $ 259.26 $ 1,520.34 $ 400.77 $ 1,976.44 $ 517.50 PERS Gold $ 825.61 $ 193.82 $ 1,651.22 $ 269.89 $ 2,146.59 $ 347.50 PERS Platinum $ 1,200.12 $ (180.69) $ 2,400.24 $ (479.13) $ 3,120.31 $ (626.37) Page H-2.13
Health Plan Premiums: Bay Area Region
Amounts in green = additional amount available to you to put toward cafeteria options Amounts in (red) = your out-of-pocket expense
Cash in lieu = $275.25 monthly
2023 AFSCME – Part-time (30 hour) employees
Health plan
Employee only Employee + 1 Employee +2 or more
Monthly
premium
After $764.57 City
contribution
Monthly
premium
After $1440.83
City contribution
Monthly
premium
After $1870.46
City contribution
Anthem Blue Cross Select HMO $ 1,128.83 $ (364.26) $ 2,257.66 $ (816.83) $ 2,934.96 $ (1,064.50) Anthem Blue Cross Traditional HMO $ 1,210.71 $ (446.14) $ 2,421.42 $ (980.59) $ 3,147.85 $ (1,277.39) Blue Shield Access+ $ 1,035.21 $ (270.64) $ 2,070.42 $ (629.59) $ 2,691.55 $ (821.09) Health Net SmartCare $ 1,174.50 $ (409.93) $ 2,349.00 $ (908.17) $ 3,053.70 $ (1,183.24) Kaiser Permanente California $ 913.74 $ (149.17) $ 1,827.48 $ (386.65) $ 2,375.72 $ (505.26) Western Health Advantage $ 760.17 $ 4.40 $ 1,520.34 $ (79.51) $ 1,976.44 $ (105.99) PERS Gold $ 825.61 $ (61.04) $ 1,651.22 $ (210.39) $ 2,146.59 $ (276.13) PERS Platinum $ 1,200.12 $ (435.55) $ 2,400.24 $ (959.41) $ 3,120.31 $ (1,249.86) Page H-2.14
Health Plan Premiums: Bay Area Region
Amounts in (red) = your out-of-pocket expense
Cash in lieu = $183.50 monthly
2023 AFSCME – Part-time (20 hour) employees
Health plan
Employee only Employee + 1 Employee +2 or more
Monthly
premium
After $509.71 City
contribution
Monthly
premium
After $960.55
City contribution
Monthly
premium
After $1246.97
City contribution
Anthem Blue Cross Select HMO $ 1,128.83 $ (619.12) $ 2,257.66 $ (1,297.11) $ 2,934.96 $ (1,687.99) Anthem Blue Cross Traditional HMO $ 1,210.71 $ (701.00) $ 2,421.42 $ (1,460.87) $ 3,147.85 $ (1,900.88) Blue Shield Access+ $ 1,035.21 $ (525.50) $ 2,070.42 $ (1,109.87) $ 2,691.55 $ (1,444.58) Health Net SmartCare $ 1,174.50 $ (664.79) $ 2,349.00 $ (1,388.45) $ 3,053.70 $ (1,806.73) Kaiser Permanente California $ 913.74 $ (404.03) $ 1,827.48 $ (866.93) $ 2,375.72 $ (1,128.75) Western Health Advantage $ 760.17 $ (250.46) $ 1,520.34 $ (559.79) $ 1,976.44 $ (729.47) PERS Gold $ 825.61 $ (315.90) $ 1,651.22 $ (690.67) $ 2,146.59 $ (899.62) PERS Platinum $ 1,200.12 $ (690.41) $ 2,400.24 $ (1,439.69) $ 3,120.31 $ (1,873.34) Page H-2.15
LOCAL GOVERNMENT 101
1400 K Street, Suite 205 • Sacramento, CA 95814 • 916.658.8208 F 916.444.7535 • www.ca-ilg.org The Institute is grateful to Dr. Rhonda Albey for preparing this piece. Dr. Albey has worked in labor relations for Los Angeles County since 1990.

Additional Resources
The Institute has two glossaries to assist
local officials as they engage with
constituents, bargaining representatives
and each other about labor relations and
public pension issues:
• Labor Relations Terminology:
http://www.ca-ilg.org/post/laborrelations-terminology
• Public Pension Terminology:
http://www.ca-ilg.org/post/publicpension-terminology
Understanding the Labor Negotiations Process
August 17, 2012
Under California law,1 when county or city employees
are represented by a union, the agency must negotiate
with that union regarding their pay and benefits,
working hours, and working conditions. This paper
explains the key elements of that process.

Roles
Elected officials determine the agency’s bargaining
position and consult with staff throughout the
negotiation process. Agency staff report back to
decision-makers about the face-to-face negotiations’
progress and any impediments to reaching agreement.

Before Bargaining
Prior to meeting with the union, the agency’s negotiators will meet with elected officials to discuss how to proceed. Having this meeting well in advance of negotiations gives elected officials time to consider relevant issues and develop a set of questions.

Early conversations also give staff time to compile necessary information for decisionmakers. Examples of such information may include:
• Anticipated increases in current employee expenditures • Money available for salaries and benefits
• Cost of salary and benefit enhancements
• What comparable employers are paying
• Turnover statistics
Just as elected officials need time and information to make well-informed decisions, staff will need time to prepare and provide accurate information. As with any issue, limited staff resources may make it advisable to prioritize information requests.

Conversations about the agency’s initial bargaining position typically take place in closed session.
2 The agency’s negotiators will share their understanding of what it will take to ATTACHMENT L Page H-2.16
Understanding the Labor Negotiations Process 2012
Institute for Local Government www.ca-ilg.org 2
Expect to be Misquoted
People tend to hear what they
want to hear.

Someone may say something like
“I’ll speak to the negotiating
team,” and mean exactly that –
they’ll speak to them.

The employees may hear “He/she
will speak to the negotiating team
and tell them to give us what we
want.”
Some strategies for minimizing
miscommunication are to take
notes during the discussion and
not to meet with union
representatives alone.

The Process Can Be
Rough
During the negotiations process,
the union may organize
demonstrations and/or phone and
e-mail campaigns. Discourse may
become bullying and emotional.

Don’t take it personally – it’s all
part of the process. Both sides
may need to show they are doing
their job. Union negotiators need
to show their members that they
are fighting for them and elected
officials need to show they are
working hard for the community.
reach agreement with the union. The agency’s governing body will then give negotiators an initial bargaining position.

During Bargaining
No matter how reasonable the agency’s initial bargaining position is, it is unlikely that the union will immediately accept it.

The negotiation process is unpredictable. The
agency’s negotiators may have misread the union’s
priorities and goals. Union representatives may
have misread the employees’ mood. New issues
may arise. There may be internal divisions within
the union. These challenges may make it impossible
to get agreement within the original parameters
authorized.

Working with the Agency’s Negotiators. As
challenges arise, the agency’s negotiators may ask
for modifications in the bargaining position. This is
normal in the course of any type of negotiation, as
each party learns more about the interests of the
other. Multiple meetings with the negotiating team
may be necessary.

Modifications may not involve increases in total
expense. An example is moving money from benefits
to salaries (or vice-versa). Another example is if
decision-makers have authorized higher increases for
some position classifications than others, employee
representatives may ask to even increases out.

Meeting with Union Officials. As negotiations
continue, the union may seek meetings with individual
elected official(s) to discuss the agency’s bargaining
position. As with any group of constituents, an elected official can choose to meet with them or not. If an
elected official does meet with union officials, the
official should be clear that the official is not speaking on behalf of the governing body.

A word of caution about meeting with employees
without their union representative during labor
Page H-2.17
Understanding the Labor Negotiations Process 2012
Institute for Local Government www.ca-ilg.org 3
An Expired Contract
is not the Same as
No Contract
If the contract has expired
and agreement has not been
reached on a new one, the
agency must maintain the
status quo until there is a
new agreement.
negotiations: such meetings can lead to an unfair labor practice accusation of “direct dealing.”3 Avoid any action that makes it appear that the agency is interfering in the union’s relationship with the employees it represents.

If the elected official meets with union representatives, it is helpful to share the conversation with the agency’s bargaining representatives. The conversation may provide insights that will help the agency’s negotiators move the process forward.

If Agreement Is Reached
The agreement still has to be ratified by the rank and file. The union may feel it needs to sell the agreement as a victory for its members. The union may post flyers or e-mails trumpeting their win over management.

For their part, elected officials may hear concerns from constituents that the agency is spending too much on employee salaries and benefits. Agency officials are well-advised to be moderate in their public discourse relating to the agreement. Anything that might be construed as bragging about the agency’s victory in the bargaining process may jeopardize the agreement. The employees won’t ratify the agreement if they think it is a bad deal or their representatives weren’t
sufficiently aggressive on their behalf.

A helpful practice can be a public statement that
does not validate either extreme, but says
something to the effect that “We reached a deal to
provide adequate public services at reasonable
cost.”
If Agreement Cannot Be Reached
What happens if the agency can’t reach an agreement? There are procedures under state law for resolving impasse. A local labor relations resolution may provide further guidance on procedures.

Mediation
A mediator may be brought in to try and resolve differences between the agency and the union. Mediators have no authority to impose a settlement, but can be useful in helping the parties look at the problem from a new perspective and to move past personal differences. The state Division of Mediation and Conciliation can provide a mediator.

Fact-finding. Whether or not mediation occurs, the union may request fact-finding as a next step. With the assistance of the Post Agreement Issues
While the agency will not have to
negotiate during the term of the
agreement, issues may arise
between negotiations that may
require changes.

Page H-2.18
Understanding the Labor Negotiations Process 2012
Institute for Local Government www.ca-ilg.org 4
This resource is a service of the Institute for Local Government (ILG) whose mission is to promote good government at the local level with practical, impartial, and easy-to-use resources for California communities. ILG is the nonprofit 501(c)(3) research and education affiliate of the League of California Cities and the California State Association of Counties. For more information and to access the Institute’s resources on Local Government 101 go to http://www.ca-ilg.org/localgovt101.

The Institute thanks the following individuals for their review and input into this resource:
• Holly Brock-Cohn, Human Resources Director, City of Alameda • Casey Echarte, Assistant Human Resources Director, City of San Mateo • Eraina Ortega, Legislative Representative, Employee Relations & Human Resources, California State Association of Counties
• Delores Turner, Assistant City Manager, Administrative Services Department, City of Emeryville The Institute welcomes feedback on this resource:
• Email: [email protected] Subject: Understanding the Labor Negotiations Process • Fax: 916.444.7535
• Mail: 1400 K Street, Suite 205 ▪ Sacramento, CA ▪ 95814 Public Employee Relations Board (PERB), a fact-finding panel is appointed which reviews both parties’ proposals, holds hearings and ultimately recommends a settlement.

Unilateral implementation. After exhausting the impasse procedure and holding a public hearing, the agency may impose its final financial offer upon the employees.

Management cannot force the union to accept a whole new contract.

Unilateral implementation cannot be used to impose work rule or operational changes and can only be implemented for one year. After that year, or during the year, if the union indicates it has a significant change in its position, the agency must bargain again with the union to try and reach a mutual agreement.

Page H-2.19
Understanding the Labor Negotiations Process 2012
Institute for Local Government www.ca-ilg.org 5
References and Resources
1 California Government Code 3500, known as the Meyers-Milias-Brown Act, (MMB) requires negotiation in good faith with the recognized employee representative on specified subjects. It also permits local agencies to adopt their own rules and regulations for the governance of labor relations. 2 See Cal. Gov’t Code § 54957.6, which provides:
54957.6. (a) Notwithstanding any other provision of law, a legislative body of a local agency may hold closed sessions with the local agency's designated representatives regarding the salaries, salary schedules, or compensation paid in the form of fringe benefits of its represented and unrepresented employees, and, for represented employees, any other matter within the statutorily provided scope of representation.

However, prior to the closed session, the legislative body of the local agency shall hold an open and public session in which it identifies its designated representatives.

Closed sessions of a legislative body of a local agency, as permitted in this section, shall be for the purpose of reviewing its position and instructing the local agency's designated representatives.

Closed sessions, as permitted in this section, may take place prior to and during consultations and discussions with representatives of employee organizations and unrepresented employees.

Closed sessions with the local agency's designated representative regarding the salaries, salary schedules, or compensation paid in the form of fringe benefits may include discussion of an agency's available funds and funding priorities, but only insofar as these discussions relate to providing instructions to the local agency's designated representative.

Closed sessions held pursuant to this section shall not include final action on the proposed compensation of one or more unrepresented employees.

For the purposes enumerated in this section, a legislative body of a local agency may also meet with a state conciliator who has intervened in the proceedings. (b) For the purposes of this section, the term "employee" shall include an officer or an independent contractor who functions as an officer or an employee, but shall not include any elected official, member of a legislative body, or other independent contractors. 3 See Cal. Lab. Code § 1156; Ruline Nursery Co. v. Agricultural Labor Relations Bd., 169 Cal. App. 3d 247, 266, 216 Cal. Rptr. 162, 172 (1985)
G:\INSTITUTE\Gov 101\Human Resources\Labor Relations Basics \Understanding the Labor Negotiations Process_August 2012.docx Page H-2.20
City Manager's Office
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov

STAFF REPORT
City Council
Meeting Date: 4/4/2023
Staff Report Number: 23-088-CC
City Council Intiated Item Direction on advisory body and commissioner stipends
Recommendation
Provide direction to staff on advisory body and commissioner stipends.

Background
On March 28, 2023, Vice Mayor Taylor requested an agenda item for City Council discussion of advisory body and commissioner stipends.

Analysis
Pursuant to City Council Procedure #CC-20-013 (Attachment A), the City Council may discuss the item and ask staff questions regarding preliminary scope, analysis and resource requirements. After discussion, with a motion and second, the City Council may take one of the following actions:
• Direct the city manager to prioritize staff resources to prepare a formal staff report for further City Council consideration and/or action, or
• Direct the item to an advisory body for preparation of a formal staff report with no additional staff support required, or
• Direct the city manager to prepare a formal staff report for further City Council consideration as resources are available, or
• Defer action to the City Council’s annual goal setting process.

Impact on City Resources
Determined by City Council direction.

Environmental Review
This action is not a project within the meaning of the California Environmental Quality Act (CEQA) Guidelines §§15378 and 15061(b)(3) as it will not result in any direct or indirect physical change in the environment.

Public Notice
Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 hours prior to the meeting.

AGENDA ITEM I-1 Page I-1.1
Staff Report #: 23-088-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov Attachments
A. City Council Procedure #CC-20-013
Report prepared by:

Justin I.C. Murphy, City Manager
Page I-1.2
CC 20200825

CITY COUNCILMEMBER REQUESTS
City Council Policy #CC-20-013
Adopted August 25, 2020
Purpose
The purpose of this procedure is to provide transparency into requests by individual City Councilmembers that result in the use of staff time. The policy applies to all City Councilmembers equally and allows the full City Council to determine how to use limited city resources.

For this procedure, a “City Councilmember request” is defined as a request to use city resources in a manner that exceeds the City Council approved budget, priorities, or work plan. This includes requests directed to the city manager, city attorney, and all city staff members. This procedure also applies to City Council appointed commissions and committees.

Requests to add items to a future agenda
To make a request
To request consideration of an item at future City Council meetings, City Councilmembers may send the request via email to the city manager, with a copy to the Mayor and Vice Mayor, or via email to [email protected]. The request must be received no later than two (2) business days prior to publication of the meeting agenda. The request will automatically appear under “City Council initiated items” at the end of the City Council’s regular agenda.

Initial City Council consideration of request
As an agendized item under “City Council initiated items” the City Council may discuss the item and ask staff questions regarding preliminary scope, analysis, and resource requirements. After discussion, with a motion and second, the City Council may take one of the following actions:
 Direct the city manager to prioritize staff resources to prepare a formal staff report for further City Council consideration and/or action, or
 Direct the item to an advisory body for preparation of a formal staff report with no additional staff support required, or
 Direct the city manager to prepare a formal staff report for further City Council consideration as resources are available, or
 Defer action to the City Council’s annual goal setting process.

If the request does not receive sufficient City Council support, the item is not considered further.

City Council action
When the staff report is available, the report will be placed under “City Council initiated items” for City Council discussion and action at the next City Council meeting, regardless of agenda load management exercised by the Mayor, Vice Mayor, and city manager.

Request to modify operations or for special projects
To make a request
To request consideration of a change in operations or for a special project, a City Councilmember may send the request via email to the city manager, with a copy to the Mayor and Vice Mayor, or via email to [email protected]. The request must be received no later than two (2) business days prior to publication of the meeting agenda. The request will automatically appear under “City Council initiated items” at the end of the City Council’s regular agenda.

Initial City Council consideration of request
As an agendized item under “City Council initiated items” the City Council may discuss the item and ask the city manager the preliminary assessment of the scope, analysis, and resource requirements of the request. After discussion, with a motion and second, the City Council may take one of the following actions:
 Direct the city manager to prioritize staff resources to prepare a formal staff report for further City Council consideration and/or action, or
 Direct the city manager to prepare a formal staff report for further City Council consideration as resources are available, or
 Defer action to the City Council’s annual budget process.

If the request does not receive sufficient City Council support, the item is not considered further.

City Council action
When the staff report is available, the report will be placed under “City Council initiated items” for City Council discussion

ATTACHMENT A

CITY COUNCILMEMBER REQUESTS
City Council Policy #CC-20-013 2
Adopted August 25, 2020
and action at the next City Council meeting, regardless of agenda load management exercised by the Mayor, Vice Mayor, and city manager.

Emergency and non-agendized items
Emergency and non-agendized items may be added to an agenda only in accordance with state law. Emergency items are only those matters affecting public health or safety such as work stoppages, disasters and other severe emergencies.

Adding an emergency item requires a majority vote. Emergency items are very rare. An item that the City Council would like to act on after agenda posting is considered a non-agendized item.

Non-agendized items may be added to the agenda only if the City Council makes findings that (1) the need to consider the item arose after the posting of the agenda, and; (2) there is a need to take immediate action at this meeting of the City Council. These findings must be approved by a four-fifths vote; if less than five members of the City Council are present, the findings require a unanimous vote of those present.

Emergency and non-agendized items are not be used to bypass the City Councilmember request process above.

Procedure history
Action Date Notes
Draft procedure presented July 18, 2020 City Council continued item to August 25, 2020 Procedure adoption August 25, 2020 Draft procedure amended at City Council direction. Staff edit to clarify definition of a “non-agendized item”
Page I-1.4
City Manager's Office

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov

STAFF REPORT
City Council
Meeting Date: 4/4/2023
Staff Report Number: 23-092-CC
Informational Item: City Council agenda topics: April 18 – May 9, 2023 Recommendation
The purpose of this informational item is to provide the City Council and members of the public access to the anticipated agenda items that will be presented to the City Council. The mayor and city manager set the City Council agenda so there is no action required of the City Council as a result of this informational item.

Policy Issues
In accordance with the City Council procedures manual, the mayor and city manager set the agenda for City Council meetings.

Analysis
In an effort to provide greater access to the City Council’s future agenda items, staff has compiled a listing of anticipated agenda items, Attachment A, through May 9, 2023. The topics are arranged by department to help identify the work group most impacted by the agenda item.

Specific dates are not provided in the attachment due to a number of factors that influence the City Council agenda preparation process. In their agenda management, the mayor and city manager strive to compile an agenda that is most responsive to the City Council’s adopted priorities and work plan while also balancing the business needs of the organization. Certain agenda items, such as appeals or State mandated reporting, must be scheduled by a certain date to ensure compliance. In addition, the meeting agendas are managed to allow the greatest opportunity for public input while also allowing the meeting to conclude around 11 p.m. Every effort is made to avoid scheduling two matters that may be contentious to allow the City Council sufficient time to fully discuss the matter before the City Council.

Public Notice
Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 hours prior to the meeting.

Attachments
A. City Council agenda topics: April 18 – May 9, 2023
Report prepared by:

Judi A. Herren, Assistant to the City Manager/City Clerk AGENDA ITEM J-1 Page J-1.1
Through May 9, 2023
Tentative City Council Agenda
# Title Department Item type City Council action1 Adopt Fiscal Year 23-24 Budget Principles ASD Regular Approve2 Quarterly Personnel Activity Report ASD Informational Receive and file 3 Closed sesssion: Labor ASD, CA Closed Session No action 4 Consider the Planning Commission’s recommendation to approve the vesting tentative map extension and adopt a resolution to approve a two-year extension of a vesting tentative map to merge the existing SP-ECR/D CDD Public Hearing Adopt resolution
5 Advisory body annual appointments CMO Advisory Body Vacancies and Appointments Decide6 Planning Commission Interviews CMO Special No action7 First Reading of Zero Emission Landscaping Equipment (ZELE) Ordinance CMO Regular Approve 8 Goal and priority setting follow-up/final report CMO Regular Receive and file9 Introduction and first reading of Streetaries outdoor dining ordinance CMO Regular First read/intro ordinance 10 Proclamation: May Mental Health Month CMO Proclamation No action11 Resolution approving the California Governor’s Office of Emergency Services Form 130 in order to pursue State financial assistance CMO Consent Adopt resolution 12 Study Session: Reach Codes 2.0 CMO Study Session No action13 Transmittal of city attorney billing (Feb and Mar 2023) CMO Informational No action14 Update CC-23-004 to include EQC roles and responsibilities CMO Consent Adopt resolution 15 Amendment to the Belle Haven School field joint-use agreement with Ravenwsood City School District LCS Consent Adopt resolution 16 Appropriate funds related to and supporting the Menlo Park Community Campus project microgrid switchgear LCS Regular Approve17 Aquatics operator agreement LCS Regular Contract award or amend18 Menlo Park Community Campus - Preliminary staffing, operations, and programming plan considerations LCS Informational No action19 Police Department AB 481 annual review and ordinance renewal PD Regular Receive and file, Adopt resolution 20 Police department quarterly update – Q1 January 2023 - March 2023 PD Informational Receive and file 21 Adopt a resolution certifying housing policy compliance required to accept One Bay Area Grant - third cycle (OBAG3) funds PW Consent Adopt resolution 22 Approval of Amendment #2 to the SFCJPA Members Agreement PW Consent No action23 Proclamation: Recognizing May 2022 as Bike Month PW Proclamation No action24 Proclamation: Recognizing Public Works Week PW Proclamation No action 25 Provide direction on restarting the Neighborhood Traffic Management Program (NTMP) PW Study Session Direction to staff 26 Provide direction on the Ravenswood Bike Lane Pilot PW Study Session Direction to staff27 Provide update on quick build project at Menlo Ave/University Dr intersection PW Informational No action 28 Quiet zone study session PW Study Session Direction to staff ASD-Administrative Services
CMO- City Manager's Office
CDD-Community Development
LCS-Library and Community Services
PD-Police
PW-Public Works

ATTACHMENT A
Through May 9, 2023
Tentative City Council Agenda
# Title Department Item type City Council action29 Review and provide feedback on the draft Capital Improvement Program PW Study Session Direction to staff30 Willow Oaks Park Improvement Project award of contract PW Consent Contract award or amend ASD-Administrative Services
CMO- City Manager's Office
CDD-Community Development
LCS-Library and Community Services
PD-Police
Page J-1.3
PW-Public Works
Public Works
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov

STAFF REPORT
City Council
Meeting Date: 4/4/2023
Staff Report Number: 23-089-CC
Informational Item: Update on Belle Haven traffic calming plan implementation
Recommendation
This is an informational item and does not require City Council action. The report transmits an update on the Belle Haven traffic calming plan and related projects.

Policy Issues
The development of the Belle Haven Neighborhood traffic calming plan (Plan) and its implementation fulfill “Mitigation Measure TRA-3.1” of the mitigation monitoring and reporting program (MMRP) established in the Facebook campus expansion project final environmental impact report (FEIR) approved in 2016. This was identified as a mitigation measure due to the potential for the Facebook Campus Expansion project to exacerbate cut-through traffic in the neighborhood. (The Plan is not a negotiated benefit of the recorded development agreement for the project.) At the request of the City Council, this MMRP requirement is included in the City’s capital improvement program and considered part of staff’s baseline work.

Background
On August 20, 2019, the City Council approved the final Plan and adopted Resolution No. 6492 to remove on-street parking for intersection bulbouts. In June 2020, temporary traffic calming measures within City jurisdiction were installed. Additionally, schematic design plans on third party agency right-of-ways were submitted to the San Francisco Public Utilities Commission (SFPUC) for improvements along Ivy Drive (Hetch Hetchy pipelines) and Caltrans for improvements along Willow Road (State Route 114) in October 2020 for initial review.

On March 23, 2021, staff presented to the City Council a set of revisions to the previously approved implementation process as a result of the unexpected COVID-19 pandemic, which centered on data collection and a neighborhood-wide community survey. A hyperlink of the staff report is provided in Attachment A.

Analysis
On September 21, 2021, the City Council approved a final modified plan. A hyperlink of the staff report is provided in Attachment B. The final adopted plan includes the following elements (Attachment C):
• Speed feedback signs – retain the permanent measure on Chilco Street • Bulbouts – proceed with permanent installation on Newbridge Street and Terminal Avenue • Speed humps – install three speed humps on Chilco Street between Hamilton Avenue and Newbridge Street and one on Newbridge Street between Hollyburne Avenue and Sevier Avenue • Neighborhood signs – install neighborhood welcome signs on Newbridge Street, Hamilton Avenue and AGENDA ITEM J-2 Page J-2.1
Staff Report #: 23-089-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov Chilco Street
• Ivy Drive improvements – continue to coordinate with SFPUC to permanently install crosswalks and median nose modifications at intersections between Chilco Street and Carlton Avenue • Willow Road and Newbridge Street signal modifications – continue to coordinate with Caltrans to install signal improvements, including a dedicated left turn phase and select right turn on red restrictions The final plan was developed based on public review, City Council direction, and coordination with SFPUC and Caltrans. The review process from these third parties included multiple rounds of comments on conceptual designs, presentation to the SFPUC Project Review Committee meeting in November 2020, and multiple field meetings with Caltrans.

Since the September 21, 2021 City Council meeting, staff worked with Meta to complete final design of improvements (October 2021 through September 2022) and have been coordinating with Caltrans and SFPUC to receive authorization to complete all of the improvements outlined in the adopted plan. Delays reaching agreement with these third party agencies have extended the timeframe for implementation of the plan.

The City submitted an encroachment permit to Caltrans in June 2022 and have had multiple rounds of coordination and comment from Caltrans that are nearing resolution. Staff anticipates receiving that permit by the end of April 2023.

After receiving final design approval from the SFPUC in September 2022, the SFPUC prepared a licensing agreement and consent letter, which was finalized in February 2023. The licensing agreement establishes the policies and guidelines for all infrastructure constructed by the City on the SFPUC ROW. The agreement covers more than just the current set of improvements and no construction on SFPUC ROW is permitted without the agreement. The consent letter, the equivalent of an encroachment permit for SFPUC, will permit contractors to construct the improvements on Ivy Drive. The licensing agreement is circulating for signatures now and should be fully executed by the end of April.

Schedule
The remaining schedule to implement the plan is as follows:
• April 2023. Complete permitting with Caltrans.
• April – May 2023. Meta bids the project and brings on a contractor. • June or July 2023 through October 2023. Construction will be prioritized along Ivy Street and Terminal Avenue during the summer months to limit impacts on children traveling to and from school at Belle Haven Elementary.

Construction notifications
Staff will provide the following notifications in English and Spanish for construction:
• Email to individuals who have expressed interest on the project page • Postcards to blocks/homes where there will be immediate construction impacts • A-frames placed along key corridors
• Citywide weekly digest
• City weekly construction news
• Share materials with local institutions, including the Belle Haven Child Development Center, Belle Haven Library, Belle Haven Elementary and Beechwood School
Page J-2.2
Staff Report #: 23-089-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov Related project coordination
In addition to the improvements being implemented by the Plan, there are several other improvements the City is working on along Willow Road. For the last year, staff have been coordinating with Caltrans on the repaving of Willow Road (State Route 114). Specifically, staff developed an alternate pavement marking plan that includes high visibility crosswalks and buffers for the existing bike lanes. In February 2023, Caltrans accepted the City’s proposed pavement marking plan and will be implementing the new striping as the weather allows.

In June 2022, the City submitted a grant to the California Active Transportation Program (ATP) to fund additional safety crossing enhancements and physical separation for the bike lane (called a Class IV or separated bikeway) along Willow Road from Bayfront Expressway to Durham Street (where bicycle lanes end). The City was not successful with this grant and received a debrief in February 2023. The City was encouraged to apply in a future round (typically every other year). The ATP grants are incredibly competitive and the California Transportation Commission staff did not flag any significant issues with the City’s grant proposal, just a need to strengthen the application as it relates to the grant criteria.

Staff will explore applying to either the next ATP cycle or to other grant sources. One upcoming grant opportunity may be the San Mateo County Transportation Authority Measure A & W Highway Program, which provides funding for multimodal improvements on state routes, including U.S. 101, SR 82 (El Camino Real), SR 114 (Willow Road), and SR 84 (Bayfront Expressway).

In addition to these City-led efforts, the City/County Association of Governments (C/CAG) for San Mateo County has been conducting a Community-based Transportation Plan (CBTP) for southeast San Mateo County for the last several years. Originally started in 2019, this plan was substantially delayed by the pandemic. The CBTP (Attachment D) is intended to provide a local exploration of regional transportation needs and was informed through both a stakeholder group, including City staff, and public engagement including a presentation to the Complete Streets Commission March 10, 2021. C/CAG will be bringing an item to City Council to support the adoption of this plan in the next several months.

Impact on City Resources
There is no impact on City resources.

Environmental Review
This informational update is not a project within the meaning of the California Environmental Quality Act (CEQA) Guidelines §§ 15378 and 15061(b)(3) as it will not result in any direct or indirect physical change in the environment.

Public Notice
Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 hours prior to the meeting.

Attachments
A. Hyperlink – March 23, 2021, City Council staff report: menlopark.gov/files/sharedassets/public/agendasand-minutes/city-council/2021-meetings/agendas/20210323-city-council-agenda-packet.pdf#page=386 B. Hyperlink – September 21, 2021, City Council staff report:

Page J-2.3
Staff Report #: 23-089-CC

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov menlopark.gov/files/sharedassets/public/agendas-and-minutes/city-council/2021- meetings/agendas/20210921-city-council-agenda-packet.pdf#page=166 C. Adopted Belle Haven traffic calming plan
D. Hyperlink – C/CAG Southwest San Mateo County CBTP: ccag.ca.gov/wpcontent/uploads/2023/03/SoutheastSanMateo_CBTP_2-9-2023_FINAL_Optimized_FullAppendix.pdf Report prepared by:

Kevin Chen, Senior Transportation Engineer
Report reviewed by:

Hugh Louch, Assistant Public Works Director - Transportation Page J-2.4
Belle Haven
Neighborhood Traffic CalmingPlan
August 2018

WILLOW ROAD
Terminal Ave
Hamilton Ave

BAYSHORE FREEWAY
Del Norte Ave
BieberAve
Plumas Ave

CHILCO STREET
Hill Ave
Modoc Ave
AlmanorAve

IVY DRIVE
Henderson Ave
Windermere Ave
Hollyburne Ave
Sevier Ave
Madera Ave
Carlton Ave
Oakland Ave
Windermere Ave
Willow Rd
Saratoga Ave
Westminster Ave
Jarvis Ave
Henderson Ave
O’Brien Dr
Alberni St
Van Buren Rd
Bay Rd
Ringwood Ave
Tehama Ave
Sonoma Ave
Pierce Rd
Sandlewood St
AlmanorAve
MenloOaksDr
Belle Haven
Elementary
School
Menlo Park Senior Center
Beechwood School
Berkeley Ave
Market Pl

IVY DRIVE
Hamilton Ave

NEWBRIDGE STREET
2 2 2 2
2 1
1 1
2 2
11 3
4 9 12
2 2
2 2 11
6 13
13 2 2 2
8 2
10 6
6 13
Berkeley Ave
Legend
1 Updated School Signage2 Marked Crosswalk3 Yellow Centerline 4 Sharrow5
6 Speed Hump
7 Raised Crosswalk8 Speed Feedback Sign9 Blank Out Sign* 10 New Sidewalk11 Bulbout**12 Left Turn Arrow
13 Raised Intersection
Edge Line Stripe 14 Gateway Treatment
*No right turn blank out sign will activate concurrent with Northbound left turn**Will require removal of localized on-street parking spaces (~ 2-4 spaces per location) Median Nose Neighborhood Sign
September 2021
turn **Includes removal of localized on-street parking spaces (~2-4 spaces per location) Wkdy: 4 - 6 p.m.

Note:1. City responsible for Terminal Ave. bulbouts implementation at Plumas Ave. and Hill Ave.

ATTACHMENT C
Page J-2.5
Library and Community Services

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov

STAFF REPORT
City Council
Meeting Date: 4/4/2023
Staff Report Number: 23-090-CC
Informational Item: Belle Haven School redesign update – Ravenswood City School District
Recommendation
This is an informational item and does not require City Council action. City staff recommends that the City Council review this update related to Ravenswood City School District’s (District)proposed redesign of the Belle Haven School, including a proposed configuration of interim classrooms (portables) on the field and tennis court area during project construction (Attachments A, B and C.) Policy Issues
City Council sets policy and goals and provides direction to staff regarding municipal projects and services to the Menlo Park community; and authorizes joint-use agreements between the City and external agencies.

Background
Belle Haven School is owned and operated by District. The school is centrally located in the Belle Haven neighborhood at 415 Ivy Drive, and includes approximately 1.6 acres of green space with a field, walking path, youth baseball diamond and tennis court which are accessible to the public when not in use by the school.

The City of Menlo Park (City) and District jointly maintain and share access to the Belle Haven School’s field area through a joint-use agreement executed in 2001 (Attachment D.) The agreement’s current term is for 25 years, ending the last day of calendar year 2026, then automatically extending from calendar year to calendar year thereafter unless one of the parties gives notice of termination by December 31 of any year, at which point the agreement would terminate at the end of the following calendar year.

On June 7, 2022, District voters approved Measure I to provide capital funding for improvements to District facilities. With the resulting bond proceeds, District has begun the process to design a major renovation of the Belle Haven School campus facilities and field area.

On February 22, District staff provided a presentation to the Parks and Recreation Commission (PRC) of preliminary options to redesign the field area on the north side of the school campus, with the intent to make that area more accessible and beneficial to the Belle Haven neighborhood (Attachment A.) The PRC offered questions and feedback about various elements of the preliminary redesign options including community access to the tennis court, youth baseball field and gymnasium; community engagement in the design process; natural and artificial turf options; water use for irrigation; and the project budget.

On March 14, City Council received an informational update about District’s proposed redesign of the Belle Haven School field area, which referenced a January 2024 construction start date. Shortly after this informational update, the District notified staff of the need to install interim classrooms (portables) on the AGENDA ITEM J-3 Page J-3.1
Staff Report #: 23-090-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov school field area in summer 2023 to provide for a January 2024 construction start date. The following section provides additional background and updates.

Analysis
Project website and timeline
District has created a project website about the Belle Haven School redesign project that includes background documents, preliminary design plans, community engagement opportunities and project timeline information (Attachment A.) District’s current project timeline is to install interim classrooms (portables) on the school field area in summer 2023, begin construction on school building renovations in January 2024, complete the school building renovations in summer 2025, and begin construction on renovations to the field area as soon as possible after the school building renovations are completed.

Interim classrooms (portables) on school field area
Community feedback led the District to minimize the construction duration. To accommodate the shortest possible construction duration, District is planning to temporarily relocate all student instruction to interim classrooms (portables) on the school field area (Attachment B.) To minimize disruption to instruction during the school year, District is proposing setting up the interim classrooms during summer 2023 and keeping them in place until summer 2025. During that time, the field area and tennis court would not be accessible.

After the school construction is complete and students move back into the permanent classrooms, District plans to begin improvements on the field area as soon as possible. District has prepared and is in the process of mailing a letter to Belle Haven neighborhood households describing the construction project’s features and proposed timeline (Attachment C.)
Potential amendment to the joint-use agreement
City and District staff are working together to develop a draft amendment to the joint-use agreement (Attachment D) for City Council and District board of education review and authorization. The amendment would suspend certain agreement terms during the construction period when the field area is not accessible to the City, for example by suspending the City’s contributions to the costs of maintenance to and water for irrigating the field area. Other elements of the agreement would remain in effect, such as the City’s access to and maintenance of the public access “tot lot” playground area at the corner of Ivy Drive and Chilco Street. City staff anticipates presenting a draft amendment to City Council for review and authorization April 25, and to District’s board of education April 27.

Impact on City Resources
There is no impact on City resources.

Environmental Review
This informational report is not a project within the meaning of the California Environmental Quality Act (CEQA) Guidelines §§ 15378 and 15061(b)(3) as it will not result in any direct or indirect physical change in the environment.

Public Notice
Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 hours prior to the meeting. In addition, District has provided and is planning several opportunities for community input to the design process, including the PRC presentation February 22, in-person community Page J-3.2
Staff Report #: 23-090-CC

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov workshops at Belle Haven School April 19 and July 6, a virtual workshop June 15, and a follow-up in-person presentation to the PRC tentatively June 28. District also has prepared and is in the process of mailing a letter to Belle Haven neighborhood households describing the construction project’s features and timeline.

Attachments
A. February 22 District presentation to PRC – Belle Haven School redesign B. Proposed locations of interim (portable) classrooms during construction C. District letter to Belle Haven households
D. Joint use agreement
E. Hyperlink – District’s Belle Haven School redesign webpage: ravenswoodschools.org/ChooseRavenswood/Facilities/Belle-Haven-Redesign Report prepared by:

Sean S. Reinhart, Library and Community Services Director Page J-3.3
Belle Haven Elementary
Reimagined
February 22nd, 2023
City of Menlo Park - Parks and Recreation Commission
ATTACHMENT A Page J-3.4
Executive Summary
2 • We are working on the design for a $50m reimagined Belle Haven, the first major campus upgrade since the 1960s.
• The initial design calls for six new classrooms, modernizing 18 classrooms, a new student supports building, a new full sized gym, and a new playground. • The focus of today is the possibility to consider possible changes to the field to the north of the school to make that space even more accessible and beneficial to the Belle Haven community.
• We are planning on renovating the school classrooms beginning January 2024 and would not begin major work on the field area until Summer of 2026.

During construction the field is (likely) to be needed as swing space.

Page J-3.5
Current Site
There are a number of issues with our current site that we are hoping to address with our revised design 3 Issues we’ve heard from the community
• It is difficult to access the field. There is no clear community entrance to the field and no designated
seating on the field.
• Relatively limited shade on the field (and none on the blacktop).
• A slightly awkward overlap between the baseball field and tennis courts, and an unusually shaped field.
• A field that uses over millions of gallons of water
annually.
• The current gym is located far from the community
entrance to the field and is under-sized. Accessing the gym also gives access the core campus.
• Publicly inaccessible black-top space behind the
school.

Page J-3.6
Preliminary Campus Design
Our proposed initial design addresses many of the issues that we’ve heard with the site 4 Focus of today’s
conversation
Page J-3.7
Preliminary Campus Design
We are not presenting final designs – more options for conversation 5 • While the campus designs are settling into place, the designs for the field are in earlier stages
• The goal of these designs is to show pieces in place without focusing on the many aspects that will come in the final design (such as additional trees) • This area is the last to be built; while we need to submit some preliminary designs with the campus, we will have significantly more time to finalize the design for this space
Page J-3.8
Preliminary Campus Design: Option 1
Our initial plan called for a new gym, additional parking, a community picnic area, a renovated turf field, a bio-swale divisor
6 New full size basketball
gym with a community
entrance (to the north)
and a school entrance
(to the south)
On site parking lot – not
shown is the solar
panels and publicly
accessible EV chargers
we plan on adding
Community picnic and
recreation area with lots
of trees
New play area (brown)
and PV structure
(yellow)
Newer basketball courts,
a mini-pitch, and
greenspace
Expand the field by
removing an older play
structure
Page J-3.9
Preliminary Campus Design: Option 2
An alternative design could keep the tennis court and the tennis court 7 Keep the tennis court…
… shrink the parking lot
Keep a small
baseball field
Page J-3.10
Preliminary Campus Design: Option 2
A third alternative design could add a community benefit building (e.g. a health clinic) on the northwest corner
8 Community
Benefit Space
Add a community benefit
space (lose or relocate
the picnic grove)
The building could utilize
a mid-sized parking lot
Page J-3.11
Next Steps
Until construction begins of the field (and classrooms) begins in January of 2024, we can continue to tweak the designs
9 • 2/23 - Board approves sequencing
plan
• Early March - Submit initial design
to DSA
• January, 2024 – Begin school site
construction
• Summer, 2026 – Conclude building
construction, begin work on black
top and fields
• Fall-Summer, 2026-27 – Work on
fields blacktop
Timeline Ways to Get Involved
• Learn more on our website: http://www.ravenswoodschools.org/ChooseRavenswood/Facilities/Belle-Haven-Redesign • Join one of our three upcoming in-person and online community events • Join us at tri-weekly in-person office hours
• Give feedback through our (anonymous) on-line form
• Come to one of our bi-weekly board meetings at 2120 Euclid (this project is discussed there monthly)
• We’ll be back at the Parks Commission this Spring
• Email Will to set-up a time to talk through the project or timeline We’ve also done one Belle Haven-wide mailer and plan on doing another one – the project has also been covered in multiple newspaper articles Page J-3.12

   
$57
55 $'0,1 7.
55 7.

OPT2

RAVENSWOOD CITYBELLE HAVEN ES INTERIM CLASSROOMS

ATTACHMENT B
Page J-3.13
Dear Neighbors -
We continue to work on our $50m set of renovations to Belle Haven Elementary School, the first and largest Measure I funded project. The project includes building seven brand new classrooms and modernizing eighteen existing ones. We are also attempting to add more spaces for the community. This includes a new publicly accessible gym on the west of the campus, a reconfigured blacktop, a new playground, and renovated fields on the campus.

Across the site there will be significantly more trees, shade, and new green spaces.

Based on community feedback, we have identified three options for the field to the north of the campus (each of which includes an expanded soccer field):
1) Community picnic grove with full sized parking;
2) Existing tennis court with partial parking;
3) Community health clinic with mid-sized parking.

These options and the site overall plan are depicted on the back page. If you are interested in joining the vote on one of the options, please visit our website (https://tinyurl.com/BHredesign) or scan the QR code above.

We expect that major site construction will begin as early as January 2024 and run for ~18 months. There will be a few additional months needed for work on the fields and blacktop.

Construction will be contained entirely on the site, although there will be greater levels of construction traffic and disruption during that period.

Community feedback led us to try to make the construction duration as short as possible. To accommodate that, we are moving the entire school to temporary classrooms on the field.

To minimize disruption to the school, we are proposing setting the classrooms up this summer and keeping the temporary classrooms in place until the summer of 2025. During that time, the field and the tennis courts will not be accessible. Once students are able to move back into classrooms, we will begin improvements on the field as soon as possible.

We encourage you to learn more about the design, construction schedule, and to provide feedback on our field options. Visit our website to learn more about the project and opportunities to join online and in-person info sessions, or to give direct feedback on the plan.

All the best,
Gina Sudaria
Ravenswood City School District Superintendent
[email protected]
ATTACHMENT C Page J-3.14
Belle Haven Elementary Site Layout
Belle Haven Elementary Field Options
Option 1 Option 2 Option 3
Picnic grove with full parking Tennis with partial parking Community health clinic.

Page J-3.15
Estimados Vecinos -
Continuamos trabajando en nuestro conjunto de renovaciones de $50m a la Escuela Primaria Belle Haven, el primer proyecto y el más grande de la Medida 1. El proyecto incluye la construcción de siete nuevas aulas y la modernización de dieciocho existentes. También estamos intentando agregar más espacios para la comunidad. Esto incluye un nuevo gimnasio de accesible al público en el oeste del campus, un pavimento reconfigurado, un nuevo patio de recreo y canchas renovadas en el campus. En todo el sitio habrá significativamente más árboles, sombra y nuevos espacios verdes.

En base a los comentarios de la comunidad, hemos identificado tres opciones para la cancha al norte del campus (cada uno de los cuales incluye un campo de fútbol ampliado):
1) Picnic comunitario con estacionamiento de tamaño completo; 2) Cancha de tenis existente con estacionamiento parcial 3) Clínica de salud comunitaria.

Estas opciones y el plan general del sitio se muestran en la página posterior. Si está interesado en unirse a la votación sobre una de las opciones, visite nuestro sitio web (https://tinyurl.com/BHredesign) o escanee el código QR de arriba.

Esperamos que la construcción de sitios importantes comience en Enero de 2024 y se prolongue durante ~18 meses. Habrá algunos meses adicionales necesarios para el trabajo en los campos y pavimento. La construcción estará contenida completamente en el sitio, aunque habrá mayores niveles de tráfico de construcción y perturbación durante ese período.

Los comentarios de la comunidad nos llevaron a tratar de hacer la duración de la construcción lo más corta posible. Para acomodar eso, estamos trasladando toda la escuela a aulas temporales en el campo. Para minimizar la interrupción en la escuela, proponemos establecer las aulas este verano y mantener las aulas temporales en su lugar hasta el verano de 2025. Durante ese tiempo, el campo y las canchas de tenis no serán accesibles. Una vez que los estudiantes puedan regresar a las aulas, comenzaremos las mejoras en la cancha lo antes posible.

Le animamos a que aprenda más sobre el diseño, el calendario de construcción y que proporcione comentarios sobre nuestras opciones de campo. Visite nuestra página web para obtener más información sobre el proyecto y las oportunidades para unirse a sesiones de información en línea y en persona, o para dar comentarios directos sobre el plan.

Mejores Deseos,
Gina Sudaria
Superintendente del Distrito Escolar de Ravenswood
[email protected]
Page J-3.16
Escuela Primaria Belle Haven Plano del Sitio
Escuela Primaria Belle Haven Opciones de campo
Opción 1 Opción 2 Opción 3
Picnic comunitario con Cancha de tenis existente Clínica de salud comunitaria. estacionamiento de tamaño con estacionamiento parcial.
completo.

Page J-3.17

BELLE HAVEN SCHOOL

JOINT USE AGREEMENT
THIS AGREEMENT made and entered into this 11 th day of December , 2001, by and between the Ravenswood School District ("District"), the City of Menlo Park ("City") and the Community Development Agency of the City of Menlo Park ("CDA'') upon the following terms and conditions:

RECITALS
WHEREAS, Section 10902 of the California Education Code authorizes public agencies to enter into agreements for the purpose of organizing, promoting and conducting programs of community recreation; and WHEREAS, Section 10910 of the California Education Code provides that the governing body of any school district may use or grant the use of any of the buildings or grounds of the school district to any other public authority for the organizing, promoting and conducting of community recreation; and WHEREAS, the governing bodies of the above-named public authorities have jurisdiction over the same territory, which includes the authority to organize, promote and conduct community recreation programs; and
WHEREAS, it is to the advantage of the City for the City to use the District facilities and to the advantage of the District for the City to maintain District facilities; and
WHEREAS, the District and the City promote the joint use of recreation facilities; and
WHEREAS, the District and the City agree to work together to look for other opportunities to partner in the promotion of maximizing recreational programs for the benefit of the community; and
1 ATTACHMENT D Page J-3.18
WHEREAS, at the Belle Haven School ("Site") there currently exists improvements, as more particularly shown in Exhibit A, hereto ("Existing Improvements"); and
WHEREAS the parties desire to upgrade the Existing Improvements and other portions of the Site by removing the existing baseball field and building a tennis court in its place, laying new sod, installing a new irrigation system for the new sod, constructing a new baseball field soccer field, a learning garden with outdoor classrooms, a play area, relocating three (3) basketball courts, and doing landscaping improvements throughout the Site, all as more particularly shown in Exhibit B, hereto ("Future Improvements"); and WHEREAS, CDA has agreed to pay for the Future Improvements, as more particularly set forth below; and
WHEREAS, the City warrants that the CDA has the authority to and the City warrants that the CDA will carry out its obligations under this Agreement; and
WHEREAS, the parties agree and the District therefore determines that this Agreement will not interfere with the educational program or activities of any school or class conducted upon the real property or in any building subject to this Agreement; and
WHEREAS, the parties to this Agreement agree to take all reasonable precautions to prevent disruption to the community and safety risks to children in connection with this Agreement and the District therefore determines that this Agreement will neither unduly disrupt the residents in the surrounding neighborhood nor jeopardize the safety of the children of the school district. 2 Page J-3.19
I ', .

NOW, THEREFORE, IT IS AGREED AS FOLLOWS:

1. FUTURE IMPROVEMENTS. Contingent upon Board of the CDA approving a contract for construction, the CDA shall construct the Future Improvements at the Site as generally shown on attached Exhibit B, at the cost and expense of the CDA.

1.1 The CDA shall pay up to One Million Five Hundred Thousand Dollars ($1,500,000.00) toward the construction of the Future Improvements, which shall include all soft costs including, but not limited to costs for project management, professional services, construction permits, etc.

1.2 The City and/or the CDA shall have the sole control of the construction of the Future Improvements, including, but not limited to, the bidding process, the negotiation and award of related contracts, and the supervision of contracted work. The CDA shall indemnify and hold the District harmless from any liability and injury to any person or property that arises during construction of the Future Improvements, including, but not limited to, any and all construction claims associated with the construction of the Future Improvements (e.g., contractor claims, overrun costs, etc.).

1.3 All construction work contemplated in connection with this Agreement shall be completed in compliance with all applicable City, County, State, and Federal laws, rules and regulations, for which compliance the CDA is solely responsible.

1.4 CDA shall use its best efforts to obtain bids, commence construction, and complete the Future Improvements within a reasonable period of time. During construction, the CDA may make changes to the Future Improvements at its sole discretion, subject to consultation with the District, in order to meet budgetary concerns, so long as said changes total an amount less than or equal to the cost of fifteen (15) percent of the cost of the Future Improvements. If any proposed changes are substantial, i.e., if 3 Page J-3.20
they total an amount greater than fifteen (15) percent of the cost of the Future Improvements, the CDA may make such changes only if the District agrees to the changes in writing. It is the intent of the District and the CDA to relocate the basketball courts, lay the sod and the new irrigation system for the baseball field and soccer field and construct the tennis court and tot lot prior to the other future improvements in order to meet the budget.

1.5 The CDA may construct the Future Improvements while school is in session. If work is constructed while school is in session, the construction shall be phased in order to reduce any inconvenience and avoid any danger to the Site. Upon completion of all the Future Improvements contemplated by this Agreement, such Future Improvements as so constructed shall become and remain the property of the District free of any claim thereon by the City and the CDA, except as hereinafter provided.
2 . USE. The City and District shall have joint use of the tennis court, baseball field, soccer field and tot lot which shall be fenced and referred to as the "Use Area", and in connection therewith, the parties agree that the Use Area shall be used as follows:

2.1 Use Area: Exclusive Use. The District shall have exclusive control of the Use Area (excluding the tot lot) during "Normal School Hours," which are currently Mondays through Fridays from 8:00 a.m. to 3:30 p.m. The District will notify the City one year in advance of any change in the Normal School Hours during the course of this Agreement. The City shall have exclusive control of the Use Area for scheduled league events during the weekends, holidays and after normal school hours, and any other times during which school is not in session.

2.2 Use Area: Joint Use. The City and the District shall have joint use of the Use Area during all weekends, holidays, after normal school 4 Page J-3.21
> L
hours, and any other times during which school is not in session throughout the school year and when there are no City scheduled league events. The area shown as the tot lot shall be available for joint use by both the District and the City at all times.

2.3 Cooperation and Communication on Scheduling. It is the intent of the District and the City to avoid scheduling conflicts, to promote the widest reasonable range of usage of the Use Area by all the school children and citizens of the community, and to permit each party access to the Use Area when not in use by the other parties.

To that end, the parties shall cooperate in good faith in scheduling events for the Use Area and on communicating the various needs and desires of the respective parties for the use of the Use Area.

2.4 The parties agree that during the times in which they are making and coordinating their respective schedules during the time they have joint use of the Use Area, the activities for children on District property will be given priority over programs for adults.

3. MAINTAINANCE; COSTS.

3.1 The District and the City shall each be responsible for fifty (50) percent of all costs associated with providing water for irrigation to the Use Area, as improved by the Future Improvements. In the event the City declares that water rationing is required, the District shall only be responsible for payment of fifty (50) percent of the water usage for the allocated water amounts as set by the City.

3.2 The City shall, at its sole expense, provide regularly scheduled maintenance of the baseball field, soccer field, tennis court and tot lot, as improved by the Future Improvements, and keep the same in as good an order, condition and repair as when constructed, reasonable wear and tear excepted. Both the District and the City shall assume shared clean up responsibilities in connection with their use of the Future Improvements and land subject to this Agreement. Costs for repair over and above normal maintenance 5 Page J-3.22
shall be appropriated to the responsible agency at the time the damage occurred.

3.3 The City shall, at its sole expense, provide regularly scheduled maintenance of the Play Area/Tot Lot within the fenced area, as improved by the Future Improvements, and keep the same in as good an order, condition and repair as when constructed, reasonable wear and tear excepted.

3.4 The District shall, at its sole expense, provide regularly scheduled maintenance of the asphalted areas, learning garden, and landscaping in and around the Site and keep the same in as good an order, condition and repair as when constructed, reasonable wear and tear excepted.

4. MISCELLANEOUS.

4.1 The District shall maintain, at its sole expense, fire and property damage insurance on the Future Improvements in an amount not less than the replacement cost value. Said insurance shall be evaluated as per the District's normal schedule to determine if there should be a change in the amount of coverage. The District shall promptly repair, restore and replace all or any portion of the Future Improvements destroyed or damaged by fire or other catastrophe.

The proceeds from said insurance shall be used for said purposes, but if the proceeds are insufficient to repair, restore or replace the Future Improvements to a condition substantially the same as when first constructed, then the District and the City (and/or the CDA) shall each bear one-half of the difference between the insurance proceeds and the cost of the necessary repair, restoration or replacement of the Improvements within the Use Area.

4.2 (a) The District shall indemnify, defend and hold the City harmless from any injury to any person which occurs as a result of the negligence of the District, its officers, employees or agents in the performance of this Agreement. (b) The City shall indemnify, defend and hold District, its officers, employees and agents, 6 Page J-3.23
harmless from any and all loss, damage or injury to any person or property which occurs as a result of the negligence of the City, its officers, employees or agents in the performance of this Agreement. (c) The CDA shall indemnify, defend and hold the District, its officers, employees, and agents harmless from any and all loss, damage, or injury to any person or property which occurs as a result of the negligence of the Agency, its officers, employees or agents in the performance of this Agreement. (d) In the event of concurrent negligence, liability for any claims, suits, or actions arising out of this Agreement shall be apportioned between the Parties under the established California rules of comparative negligence.

4.3 City's right to use the Use Area under this Agreement shall extend for a period of twenty five (25) years, beginning on the date the Agreement is executed and ending on the last day of calendar year 2026. This Agreement shall automatically extend from calendar year to calendar year thereafter unless the party(ies) give(s)notice to the other party(ies) of the termination this Agreement by December 31 of any year, at which point the Agreement will be terminated at the end of the following calendar year.

4.4 All of the provisions of this Agreement shall extend to, be binding upon, and inure to the · benefit of the successors, assigns, and successors-in-interest of the parties hereto.

4.5 If any term, covenant, condition, restriction or reservation in this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remainder of the provision shall remain in full force and effect and shall in no way be affected, impaired or invalidated.

4.6 This Agreement may be amended, modified or terminated at any time only by the mutual consent in writing of the parties hereto.

4. 7 The aforementioned indemnity provisions shall survive the termination of this Agreement. Each party shall maintain all 7 Page J-3.24
insurance coverage necessary to enable it to fulfill the indemnity provisions herein.

4.8 Waiver. The failure of either party to enforce any provision of this Agreement shall not be deemed a waiver of that provision unless such party acknowledges, in writing, that it is waiving that provision.

4.9 Prohibited activities on District property. (a) Prohibitions. No alcohol, smoking, drugs, or dogs or other animals (other than seeing eye dogs), shall be permitted upon or within any of the District property covered by this Agreement while the property is being used by the City, or during the course of any activities or programs sponsored by the City. The City shall also make reasonable efforts to have these prohibitions observed by members of the general public, and will, at the request of the District or at its own initiation, adopt suitable ordinances if such action is deemed necessary and appropriate for enforcement purposes. (b) Excessive use. The City will limit or restrict the activities under its own control to avoid undue stress or damage to the District property covered by this Agreement.

4.10 Notices. Any notices given to the other party under this Agreement shall be in writing and shall be either personally delivered to the other party or sent by certified mail, return receipt requested, addressed to the other party as follows:

To the City:

To the District:

City of Menlo Park .

Attention: City Manager
701 Laurel Street,
Menlo Park , CA. 94025
Ravenswood City School District
Attention: Superintendent
2160 Euclid Avenue
East Palo Alto, CA 94303
8 Page J-3.25
IN WITNESS WHEREOF District, City and CDA have caused this Agreement to be executed by their duly authorized officials as of the day and year first above written.

Date:

Date:
9 District: Ravenswood School District
By:

I~: Chief Business Officer
Attest~A~
City: City of Menlo Park
By:

Its: cryt lf7&T
Attest: ~~ 0. /;~
CDA: Community Development Agency
of the City of Menlo Park
By:

Its: ~tie-01tczfr
Attest: ~.Ci,~
Page J-3.26
DATE:

SCALE:

DRAWN BY: BLW
DRAWING NA•IIEc.·---~
DESIGNED BY:

CHECKED BY: SURVEYED BY: ___ _
t:, APPROVED: D,.

RUBEN

CITY OF
R.

IEM.O
..a.~
PARK
OF ENGIIEERalG 6BMCES ~ ~
40998 ~ i DATE R.C.E. £ EXPIRES NO. BY OATIS
EXHIBIT A: EXISTING IMPROVEMENTS
I 0 ARK

CITY OF MENLO PARK

ENGINEERING DIVISION
701 LAUREL STREET, MENLO PARK, CA 94025-3483
PHONE (650) 856-3420 FAX (650) 858-3478

SUB-CONSULTANT CONSULTANT
l»IJSCAFE IELVN LIE AllOl1ICIS ASSOaAlES • RANaS • ASl.A II= SO ~
PACIIC AVE. SAN RANCl5CO 94119-2569 l4l5l44Hl'l88

BELLE HAVEN SCHOOL SHEET

OF SHEETS
PROJ. NAME

BELLEHAVEN SCHOOL
Page J-3.27
., ~~--
\
: l -J'-', Y', L__/ --,u :v D LJ hS u : I I I w 2-,J LJI I I 11 10 Yi I :( : I '<'-\. \,) '\' ', I I I I I I J ' I b I I I I I '' _____ I '~ i --== - i . I I : I :: i I L-c_<, I .'-----1 : -,~ 11 l"--1 :! ' I ----7 '<~y~ Is ltl I I I I I I It J t : I It I ti\ iJ I I J• JI 1-·~- 0 _~-' \) _________ ,,.,.,~\ : I I I I I It I t c----,--; I I I I t j It .f : 1 t I t t =-=.:; c.;:,v, -r-----------------1 _____ I _____ I :::i l __ li __ i' 1---==--.! '=-===:---1------1 [ _____ J :.:1 ___ it __ :;,_! L __ l!_ _____ I L_.:: ______ I ___________ ..,.., - I I · I =-~ =~" . __J ~u - Cf-LCQ STREET
-------~~-~-\--=::-'(;;:/ . ,, ... A---,-> ®®~;-®G®®~®®®·®· ~\:

City of Menlo Park
701 Laurel Street
Menlo Park, CA 94025
,---. ___ ,, r J7~-
- n ---
- l U\' J-----1 r~ 7 ' n u
- \:~- ~-
- \\·; /n ,, BJEEEE 7~.---71~ 0;:. LJ O O '::::-::::. 0 0 000 7 __ J I g \ . _ ~::::-:::~ . I 1 @
--- ---·---7 \. I I (; .-PILOT6ARDENAREA . 0 M
I
... J ! . 1· I . ~p~~N6 4 ,<:;\Cl I L • ·-"·~- Q a.

I
0 ~ '_,/ NJr1 \Cl
1<. 1',( ... - -::::. ....... ,, I I I
'
~- RIJNNIN6TRAGK_11 \Ely Ir) I' II/,~, c'./J ---------r1 d O r~-_J · ~™ ~- . . 0 ! o!/ !/ Jl I ' • GATE · /__/ / • \5/ r ; /): / 0
I ~, _._______ . / 7 ; ''.
t2,
~,.; ~;! ;(--~- f ....___ ,-
' .... . t/2 i / ...._........... ..__'-.... ....... \. --- : 0_. =''~~ / ...J . / ·-;::.··/ 8J ·_ . l'_---r---• ....... ] : . I .· l--J; -•M-. ,·--..:;/) 1/ r .

J f~i-ovoo,c:>oo·--- ·•. -.. -,,: :-1-:~ I r-- I I AL.MANOR AVEt-lJE --=~ - --------
- I.______ --~-... "> '
I ~-( ' ' 7' ' ,-----~ ~- -......,/1; /11; /J-
~
IO 11 .-·r ~/ I I n:_L __ J; ! (_~ -;r--·-·--: .,:r ,~-- .~-----. -0s / 1/ _'(// ;/"rs~~:-r 0 I n (7 I / --..... --.. o '~--.... ./..._ 1/ --..._ I I I I I // / - -.. -.. ..._., "'- !• -.. , I I I f/2 // I ' -... =-::-- I/ 1 II ... / / I I -.. • -.. ... / -....._ I \ ___ j !_____________ ! Ir;,// I / (1 -~ ----~, --•--:c.::="' - j;-~ '- , II t/ I ·1 . If'•-....._ . J'-- oi..J----------, Ii 1;,---,/ JI I -..... -........_-. K , 1 ~~)----~.1/1 -....._ -~-- I I 30 60
EXHIBIT B: FUTURE IMRPOVEMENTS
BELLE HAVEN SCHOOL 1,t:1..VN lJ'H:>SCAl'E LEE AROfTECTS ASSOCIAlES . PlAN8S . ASI.A 11e T,50 PACflC AVE. SAN IIL\NCISCO CAI.FORWI 941)9-2569 (415144Hl'lll8 Date: 11-06-01 Page J-3.28
Library and Community Services
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov

STAFF REPORT
City Council
Meeting Date: 4/4/2023
Staff Report Number: 23-093-CC
Informational Item: Update on Kelly Park athletic field synthetic turf and track renovation project
Recommendation
No action is requested related to this informational item at this time. City staff recommends that the City Council review this informational update about the proposed Kelly Park athletic field synthetic turf and track renovation project.

Policy Issues
City Council provides policy direction to the city manager regarding services to the community; allocates resources to support City services and capital projects; reviews and approves master plans; and sets prioritization for the use of City resources to serve the community.

Background
Kelly Park’s athletic field and track facility was last renovated in 2010, and features a synthetic turf field, rubberized track and exercise stations. The turf, track, and exercise stations have reached the end of their serviceable life span and need replacement. Funding for the replacement of the facility was included in the five-year capital improvement program for fiscal year 2022-23 and 2023-24.

The Menlo Park Community Campus (MPCC) project adjacent to Kelly Park began construction in 2021 and is scheduled for completion in 2024.

The City has contracted with Callander Associates to provide design plans to remove and replace the Kelly Park athletic field, track, and exercise stations with like features on a timeline to generally coincide with the MPCC opening.

Analysis
Scope of work
The scope of work for the proposed project includes removing and replacing the existing synthetic turf and rubberized track. Striping, markings and relocation of fitness stations, and irrigation laterals overlapping the work are also included in the proposed scope of work. Due to the proximity of the new MPCC building, it is recommended to relocate the exercise stations an alternative location along the track, and to remove the underutilized long jump sand pit and replace with infill plantings. The proposed project also includes installation of a new 20-foot-high soccer netting system located on the eastern edge of the field between the soccer goal and the track to protect the MPCC building and outdoor space from misdirected soccer balls.

Attachment A includes illustrations of the proposed project improvements.

AGENDA ITEM J-4 Page J-4.1
Staff Report #: 23-093-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov Alternate striping configuration – not recommended
Staff reached out to current field users in fall 2022 for input regarding the proposed field renovations.

Representatives from the American Youth Soccer Organization (AYSO) local region 109 proposed to City staff an alternative striping configuration to accommodate their organization’s specific needs. (Attachment A, striping option 2.) City staff does not recommend implementing AYSO’s proposed striping reconfiguration for several reasons. The proposed alternative striping would yield a slightly larger overall area of striping; however, it also would result in a skewed field in relation to the track and turf layout which creates several challenges. The proposed skewed striping would only provide a four-foot minimum setback from the corner of the field in relation to the track, whereas the current, non-skewed striping would preserve a seven-foot minimum setback from the track. Additionally, irrigation sprinklers would need to be relocated to accommodate the skewed configuration, which would increase the project’s cost and would delay the project’s completion timeline by approximately three months due to the need to develop additional design modifications.

Tentative project timeline
The project's tentative timeline targets the completion of construction activities in 2024 to generally coincide with the projected opening of the MPCC.
• April 4 – City Council receive informational report about the project • May/June - Additional stakeholder outreach including casual park users, MPCC Subcommittee and working group, Parks and Recreation Commission
• July – Design documents finalized
• August – Construction bidding period
• September – City Council award of construction contract • November – Construction begins
• February 2024 – Construction complete
Impact on City Resources
Based on the design plans developed to date, preliminary project construction costs are estimated at $1.8 - 2 million, which includes removing and replacing the Kelly Park synthetic turf athletic field, track, and exercise stations with like feature, and related site work. The five-year capital program included $500,000 for the project in fiscal year 2022-23, and anticipated another $1.2 million in fiscal year 2023-24 that would be considered as part of the City Council’s upcoming budget deliberations.

If the City Council were to direct staff to make substantive modifications to the project, for example by implementing AYSO’s proposed alternative striping configuration, or altering the configuration or features of the project, additional funding and/or staff resources would be necessary. City staff will provide updated design plans and cost information to City Council with the award of construction contract tentatively in September 2023.

Environmental Review
The project is categorically exempt under §15301 – Class 1 and §15304 – Class 4 of the California Environmental Quality Act Guidelines. Kelly Park’s athletic field, track, and exercise stations are considered exempt because the project involves operation, maintenance, replacement or reconstruction of facilities and minor alterations to land that the state has determined not to have a significant effect on the environment.

Page J-4.2
Staff Report #: 23-093-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov Public Notice
Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 hours prior to the meeting. .

Attachments
A. Illustrations of proposed project features
Report prepared by:

Mike Owyang, Associate Engineer
Sean S. Reinhart, Library and Community Services Director Page J-4.3

KELLY PARK TRACK AND FIELD REPLACEMENT
22034_CommunityMtgGraphics.indd
March 22, 2023
PRELIMINARY PLAN - STRIPING OPTION 1 (EXISTING)

REPLACE SYNTHETIC TURF

MPCC BUILDING
0’ 10’ 20’ 40’

RESURFACE TRACK
RES
Replace Existing Fitness
Equipment with New
Assisted Row/Push-Up Bars
(similar to existing)
Secondary Soccer
Field, Blue Striping,
Typ., 48 yd x 70 yd
(matches existing)
Primary Soccer Field,
White Striping, Typ.,
70 yd x 110 yd
(matches existing)
Remove Existing
Fitness Station
,QÀOO3ODQWLQJDW
MPCC Project Edge
Install New Goal Netting
Relocate Bollards
Expand Existing Fitness Area and Install New Equipment:•Plyometrics Platforms and Ab/Crunch/Leg Lift Bench(similar to existing)
•Parallel Bars and Pull-Up/
Dip Bars (new types ofÀWQHVVHYHQWV

ATTACHMENT A
Page J-4.4

KELLY PARK TRACK AND FIELD REPLACEMENT
22034_CommunityMtgGraphics.indd
March 22, 2023

REPLACE SYNTHETIC TURF

MPCC BUILDING
0’ 10’ 20’ 40’

RESURFACE TRACK
RES
Replace Existing Fitness
Equipment with New
Assisted Row/Push-Up Bars
(similar to existing)
Secondary Soccer
Field, Blue Striping,
Typ., 48 yd x 75 yd
Primary Soccer Field,
White Striping, Typ.,
75 yd x 110 yd
Remove Existing
Fitness Station
,QÀOO3ODQWLQJDW
MPCC Project Edge
Install New Goal Netting
Relocate Bollards
Expand Existing Fitness Area and Install New Equipment:•Plyometrics Platforms and Ab/Crunch/Leg Lift Bench(similar to existing)
•Parallel Bars and Pull-Up/
Dip Bars (new types ofÀWQHVVHYHQWV

PRELIMINARY PLAN - STRIPING OPTION 2
Page J-4.5

KELLY PARK TRACK AND FIELD REPLACEMENT
22034_CommunityMtgGraphics.indd
March 22, 2023

SYNTHETIC TURF AND TRACK SURFACING

SYNTHETIC TURF

WITH CORK INFILL

TRACK SURFACING

TOP COAT OVER EXISTING PAVED BASE
Page J-4.6

KELLY PARK TRACK AND FIELD REPLACEMENT
22034_CommunityMtgGraphics.indd
March 22, 2023

FITNESS EQUIPMENT

AB CRUNCH / LEG LIFT ASSISTED ROW / PUSH-UP PARALLEL BARS

PLYOMETRICS PULL-UP / DIP
Page J-4.7

KELLY PARK TRACK AND FIELD REPLACEMENT
22034_CommunityMtgGraphics.indd
March 22, 2023

SOCCER BALL GOAL NETTING

GOAL NETTING
20 FEET TALL
Page J-4.8
Public Works
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov

STAFF REPORT
City Council
Meeting Date: 4/4/2023
Staff Report Number: 23-094-CC
Informational Item: Update on West Bay encroachment agreement for work near Bedwell Bayfront Park
Recommendation
This is an informational item and does not require City Council action.

Policy Issues
Encroachment permits are issued by the director of public works. §13.18.020 of the City’s Municipal Code states that “No person shall perform any work, construct any facility, make any excavation or fill any excavation, store materials and/or vehicles in or upon any real property in which the City has an interest, whether by title, easement, right of way, license or otherwise, without first obtaining an encroachment permit to do so from the Public Works Director.”
Background
On December 6, 2022, City Council authorized the city manager to execute an agreement with West Bay Sanitary District (WBSD) regarding the provision of recycled water service within Menlo Park Municipal Water service area. The delivery of recycled water consists of two primary elements. The first element of the project is the Flow Equalization Recovery Facility (FERRF) Levee Improvements project, which will improve levees around the property to protect the site against 50-year sea level rise projections and remove the interior portions of the site from the Federal Emergency Management Agency (FEMA) 100-year floodplain. The second element consists of building a Recycled Water Facility on this site to serve the Bayfront area of Menlo Park. The City Council received clarification on the project site location selection, environmental impact report (EIR), public engagement of the project, mitigations, cost impacts to the customers of Menlo Park Municipal Water, impacts from construction at Bedwell Bayfront Park, and coordination with other projects and OneShoreline. The City Council discussed providing information and outreach related to project construction in both English and Spanish.

On February 3, 2023, WBSD contacted the City of Menlo Park to execute an encroachment permit agreement for the WBSD FERRF Improvements at Bedwell Bayfront Park. The project location is shown on Attachment A. WBSD intends to increase levee elevations along its boundaries with the Bay with a proposed ecotone levee and sheet piling. In doing so, WBSD will raise the grade at the vehicular entrance of the FERFF located to the southwest of the property and at the trail northeast of the property at Bedwell Bayfront Park. The improvements include sheet piles, grading and drainage within City property.

WBSD’s permit from the Bay Conservation and Development Commission (BCDC) is anticipated to be considered April 6. Recent storms have also resulted in damage to the existing levees surrounding the FERRF, so obtaining permits and advancing construction is extremely time sensitive to protect the levees from further erosion and the facility from future flooding and sea level rise.

AGENDA ITEM J-5 Page J-5.1
Staff Report #: 23-094-CC
City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov Analysis
WBSD is proposing to place approximately 3,700 linear feet of shoreline protection around the existing FERRF. The proposed shoreline protection project involves installing sheetpile walls around the entire facility and raising the grade of the perimeter berms by approximately 5 feet, in order to remove the site from the current 100-year flood zone and protect it against future sea level rise. In addition, the proposed project includes placing bay fill for nature-based shoreline protection elements, including (1) constructing an ecotone levee along the northern perimeter and over approximately 1.12 acres of existing tidal habitats, and (2) installing oyster reef structures on the mudflats near the northernmost point of the project site. To offset impacts to existing habitats, the proposed project will also setback a portion of the northern perimeter levee to create 0.65 acres of new tidal marsh habitat. The ecotone levee is intended to provide migration space for the tidal marsh habitats as sea level rises. The project includes installation of new public access amenities - one bench and an interpretive sign – at the adjacent Bedwell Bayfront Park to create an overlook area of the Bay. WBSD intends to construct drainage improvements that include a swale and twin storm drain 18-inch diameter piping. The drainage system will be installed to capture run off from the trail and be conveyed through the raised grade and outfall to Westpoint Slough to the north.

To construct the proposed improvements within the City property, WBSD must apply for an encroachment permit and execute an encroachment permit agreement. The encroachment permit agreement (Attachment B) will grant WBSD the right to install and maintain the proposed improvements in the encroachment area.

The encroachment permit and agreement are issued and enforced by the public works director. The agreement also requires coordination and outreach to address any potential construction issues on the park users, including a temporary detour for a portion of the perimeter trail during some stages of construction (see Attachment A). Per the City Council request December 6, WBSD plans to conduct outreach with materials in English and Spanish regarding construction activity. Project-specific conditions for work hours, requirements for truck haul routes, and notifications will be required of WBSD as conditions of the encroachment permit.

Impact on City Resources
WBSD is required to pay encroachment permit review fees, which cover the staff time associated with reviewing the project and issuing the permit and encroachment agreement.

Environmental Review
This informational update is not a project within the meaning of the California Environmental Quality Act (CEQA) Guidelines §§15378 and 15061(b)(3) as it will not result in any direct or indirect physical change in the environment.

On December 18, 2020, WBSD filed a Notice of Availability of the FERRF Levee Improvements and Bayfront RWF draft EIR for public review and comment; the draft EIR covers the first phase of improvements (the levee improvements and Bayfront RWF and related pipelines.) The comment period ended February 1, 2021. Comments were received, addressed, and the EIR was certified May 12, 2021.

The construction of the Bayfront RWF facility was appropriately studied and there have been no changes to the project or its circumstances, or new information available, which would trigger a requirement for a subsequent EIR under CEQA Guidelines §15162. Accordingly, no further CEQA documentation is warranted.

Page J-5.2
Staff Report #: 23-094-CC

City of Menlo Park 701 Laurel St., Menlo Park, CA 94025 tel 650-330-6600 menlopark.gov Public Notice
Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 hours prior to the meeting.

Attachments
A. Project location
B. Encroachment permit agreement
Report prepared by:

Edress Rangeen, Associate Engineer
Report reviewed by:

Ebby Sohrabi, Senior Civil Engineer
Tanisha Werner, Assistant Public Works Director - Engineering Page J-5.3
Page J-5.4 ATTACHMENT A
OAK #4877-1830-7098 v2

RECORDING REQUESTED BY
AND WHEN RECORDED RETURN TO:

City of Menlo Park
Attn: City Clerk
701 Laurel St.

Menlo Park, CA 94025
The undersigned declares this instrument to be exempt
from Recording Fees (Govt. Code § 27383) and
Documentary Transfer Tax (Rev. & Tax. Code §11922).
(Space above this line reserved for
Recorder's use only)

ENCROACHMENT MAINTENANCE AGREEMENT FOR INSTALLATION OF PRIVATE

IMPROVEMENTS WITHIN PUBLIC RIGHT OF WAY
THIS ENCROACHMENT MAINTENANCE AGREEMENT, dated this ___day of April, 2023, issued by the City of Menlo Park, a municipal corporation, hereinafter referred to as "City", to West Bay Sanitary District, fee title owner(s) (the “Permittee”) of the real property commonly known as Bedwell Bayfront Park, Menlo Park, CA 94025 for the use of, maintenance, and repair of the West Bay Sanitary District Levee surrounding the Flow Equalization and Resource Recovery Facility (FERFF), as more particularly detailed in Exhibit A (the “Facility”), within the public right-of-way (the “ROW”) in the City of Menlo Park.

RECITALS
WHEREAS, Permittee is proposing to install the Facility within City ROW, as depicted on Exhibit B (the “Encroachment Area”), and incorporated into this Encroachment Maintenance Agreement and the associated Encroachment Permit; and WHEREAS, the Facility has been reviewed, and meets the satisfaction of, all necessary City Departments including approval from the Director of Public Works as set forth in Menlo Park Municipal Code Chapter 13.18; and
WHEREAS, as a result of the foregoing, the City is issuing an Encroachment Permit addressing the liability, and maintenance of said Facility prior to the commencement of its construction as required pursuant to Chapter 13.18 of the Menlo Park Municipal Code.

CONDITIONS OF AGREEMENT

1. Limited Grant of Right to Use of Right of Way. Subject to the terms and conditions of this agreement, Permittee is granted a right to maintain the Facility in the Encroachment Area.

Permittee shall not perform any work, construct any facility, make any excavation or fill any excavation, store materials and/or vehicles in the public right of way, except for the Facility, which shall be constructed and maintained in accordance with the plans and specifications Page J-5.5 ATTACHMENT B
OAK #4877-1830-7098 v2
set forth in Exhibit A. Such work shall be performed only in the Encroachment Area as set forth in Exhibit B. The rights granted herein shall be deemed non-exclusive and revocable by City, and the City reserves the right to enter and continued use of the Encroachment Area for any public purposes.

As a material condition to this agreement, Permittee acknowledges title to the Encroachment Area shall at all times remain with the City and waives all right to contest that title.

As a condition precedent to Permittee’s right to construct in the public right of way, this permit must first be signed by the Permittee, notarized, and recorded with the County Recorder of the County of San Mateo. Any recording fee shall be paid by Permittee, if not exempt.

2. Construction, Maintenance and Repair. Permittee shall be responsible for any and all maintenance and repair of the Facility and the ROW in the vicinity of the Facility and shall keep the Facility and the ROW in good condition and repair, to the satisfaction of the City, at all times. Once FEMA certification is obtained, West Bay shall maintain the levees per the requirements of that certification. Permittee shall repair, replace and restore in kind any private property or improvements to the extent attributable to its installation, maintenance, repair or removal of the Facility at its sole expense and with the approval of City. Any and all site restoration and clean-up shall be done by a licensed and insured contractor. Construction and maintenance shall conform to Menlo Park Municipal Code section 13.18.110, and shall be performed in compliance with any standard specifications or details promulgated by the City for construction in the right of way.

Signage for park users will be provided by permittee around the construction zones that may impact foot traffic set forth in Exhibit B. All other pathways will be accessible during the construction. In addition, Flaggers will be available to direct the foot traffic. The primary work will take place on West Bay Sanitary District property. Contractor mobilization will be minimal as the majority of the levee material is on site. The Permittee’s Contractor will be required to obtain an Encroachment Permit from the City.

Permittee shall comply with all applicable laws related to the construction, maintenance, or removal of the encroachment or any action or omission in connection with any rights or obligations under this permit, including prevailing wage laws when applicable, for work performed under this permit.

3. Permits Required. In accordance with Menlo Park Municipal Code section 13.18.050, Permittee acknowledges that the rights granted under this Agreement shall not be in effect and shall be subject to any requirement that Permittee first obtain any necessary permits required by law, including but not limited to any Planning Permits or Building Permits.

4. Breach; Termination; Removal of Facility. Upon abandonment or revocation, Permittee shall, unless otherwise directed by the City and at no cost to the City, return City property to its pre-permit condition within the time specified in the notice of revocation or prior to the date of abandonment. In the event that Permittee fails to abide by the terms of this Agreement after fifteen (15) days’ written notice, the City may repair the Facility and/or right of way, or, remove the Facility and restore the right of way at the Owner’s cost. Upon 30- day notice, and an opportunity to respond, the City may add to the tax bill of the benefited property any past-due financial obligation owing to the City by way of this covenant, Page J-5.6
OAK #4877-1830-7098 v2
described in Section 7 of this Agreement. If a bond or security deposit is required under Menlo Park Municipal Code section 13.18.140, the City may apply such to costs incurred.

5. Liability, Insurance, Indemnity. Permittee shall indemnify, defend, and hold harmless the City, its officials, officers, agents, employees, and servants (collectively, the “Indemnitees”) from any and all claims, damages, costs, suits, or actions of every name, kind, and description, arising out of or related to: (a) this encroachment permit or its approval; (b) any use, construction, encroachment, maintenance, act, or omission by the Permittee or Permittee’s agents, employees, representatives, or contractors on City Property or having an impact on City’s facilities or structures; (c) the presence of the Facility or permitted improvements; (d) rerouting or reconstruction of any existing utilities; or (e) impacts on utilities caused by the Facility. The duty of the Permittee to indemnify, defend, and hold harmless, as set forth herein, shall include the duty to defend as set forth in Section 2778 of the California Civil Code, provided, however, that nothing herein shall be construed to require the Owner to indemnify the City, its subsidiary agencies, their officers, agents, employees and servants against any responsibility to liability in contravention of Section 2782 of the California Civil Code.

Permittee shall obtain, and during the term of this permit, shall maintain a policy of general liability insurance from an insurance company authorized to do business in the State of California in an insurable amount of not less than 2 million ($2,000,000) per occurrence and 4 million dollars ($4,000,000) aggregate, in a policy form of Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, or equivalent coverage. The insurance policies shall remain in full force during the life of the permit, and shall not be canceled or not renewed without thirty (30) days prior written notice to the City from the insurance company. The City and its officials, employees, contractors, agents and volunteers shall be named as additional insureds. All insurance shall be primary and non-contributory. Permittee hereby grants a waiver of subrogation in favor of the Indemnitees which any insurer of Permittee may acquire by virtue of payment of any loss. Costs of defense shall be outside the policy limits. The Permittee shall have its current general liability insurance policy on file with the City, including an Additional Insured Endorsement.

6. Relocation of Utilities. Permittee shall remove or relocate, without cost or expense to the City, any facility when made necessary (as determined by City in its sole discretion) by any lawful change in grade, alignment, or width of any street, including, the construction, maintenance, or operation of any other City underground or above-ground facilities. Said removal or relocation shall be completed within ninety (90) days of notification by the City; provided that if removal or relocation cannot reasonably be accomplished within ninety (90) days, then permittee shall commence such removal or relocation within such ninety (90) days and thereafter continue the same diligently until completion thereof. If Permittee intends to abandon a facility located above ground in the public right-of-way, Permittee must provide written notice of its intention to abandon and must remove the facility within ninety (90) days thereafter.

7. Covenant to Run with Land of Permittee. The covenants and conditions in this Agreement, including, but not limited to, indemnification of the City, shall run with the land commonly known as West Bay Sanitary District project located at 1700 Marsh Road, Menlo Park, California / APN 055-400-010, with legal description as set forth in Exhibit C (the “Property”) and shall both burden the Property and bind and inure to the benefit of the City and Owner and their respective successors and assigns.

Page J-5.7
OAK #4877-1830-7098 v2

8. Counterparts. This Agreement may be executed in counterparts, each of which shall be an original, but all counterparts shall constitute one instrument.

Attachments:

Exhibit A Plans and Specifications for Facility
Exhibit B Site Plan / Encroachment Area
Exhibit C Property Legal Description
ISSUED BY CITY OF MENLO PARK:

Nicole H. Nagaya, Public Works Director Date
ACKNOWLEDGED AND ACCEPTED BY PERMITTEE:

Sergio Ramirez, General Manager Date
West Bay Sanitary District
-NOTARIZATION REQUIREDPage J-5.8
OAK #4877-1830-7098 v2
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ____________________
On ______________________, before me, ______________________________, Notary Public, personally appeared ___________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument, the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.
________________________________________________
Place Notary Seal Above Signature of Notary Public
Page J-5.9
OAK #4877-1830-7098 v2
Exhibit A - Plans and Specifications for Facility (page 1) Exhibit A - Plans and Specifications for Facility (page 2) Page J-5.10
7 OAK #4877-1830-7098 v2
Exhibit B - Site Plan / Encroachment Area
Page J-5.11
OAK #4877-1830-7098 v2
Exhibit C - Property Legal Description
Page J-5.12
9 OAK #4877-1830-7098 v2
Page J-5.13

← All documents from this meeting