CITY OF MERCED
PROJECT NO. 119070
(CMAQ) Sidewalk Project 7th Street, 8th Street and Linda Lane Bid Opening 11/30/2021
UNIT OF ESTIMATED UNIT ITEM UNIT ITEM UNIT ITEM UNIT ITEM UNIT ITEM UNIT ITEM NO. ITEM MEASURE QUANTITY PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 Mobilization Permits, Bonds, Licenses & Insurance LS 1 25,000.00$ 25,000.00$ 34,500.00$ 34,500.00$ 10,500.00$ 10,500.00$ 20,000.00$ 20,000.00$ 73,747.00$ 73,747.00$ 34,000.00$ 34,000.00$ 2 Public Convenience and Safety LS 1 5,000.00$ 5,000.00$ 11,500.00$ 11,500.00$ 20,000.00$ 20,000.00$ 20,000.00$ 20,000.00$ 14,000.00$ 14,000.00$ 3,000.00$ 3,000.00$ 3 Surveying Services LS 1 12,000.00$ 12,000.00$ 9,372.50$ 9,372.50$ 8,150.00$ 8,150.00$ 12,312.00$ 12,312.00$ 6,300.00$ 6,300.00$ 8,150.00$ 8,150.00$ 4 Monumentation EA 2 2,000.00$ 4,000.00$ 6,900.00$ 13,800.00$ 1,600.00$ 3,200.00$ 2,376.00$ 4,752.00$ 2,900.00$ 5,800.00$ 2,200.00$ 4,400.00$ 5 Water Pollution Control LS 1 3,000.00$ 3,000.00$ 4,887.50$ 4,887.50$ 7,000.00$ 7,000.00$ 9,000.00$ 9,000.00$ 5,600.00$ 5,600.00$ 500.00$ 500.00$ 6 Clearing & Grubbing LS 1 24,000.00$ 24,000.00$ 8,689.49$ 8,689.49$ 5,000.00$ 5,000.00$ 5,400.00$ 5,400.00$ 58,000.00$ 58,000.00$ 35,000.00$ 35,000.00$ 7 Remove Concrete Sidewalk/Driveway SF 10,098 3.00$ 30,294.00$ 2.30$ 23,225.40$ 5.50$ 55,539.00$ 3.50$ 35,343.00$ 10.00$ 100,980.00$ 5.00$ 50,490.00$ 8 Remove Rolled Curb LF 1,483 12.00$ 17,796.00$ 8.05$ 11,938.15$ 18.00$ 26,694.00$ 19.82$ 29,393.06$ 20.00$ 29,660.00$ 4.00$ 5,932.00$ 9 Remove Concrete Valley Gutter SF 584 12.00$ 7,008.00$ 5.04$ 2,943.36$ 7.00$ 4,088.00$ 5.14$ 3,001.76$ 7.00$ 4,088.00$ 4.00$ 2,336.00$ 10 Remove Asphalt Concrete SF 3,361 2.50$ 8,402.50$ 1.73$ 5,814.53$ 7.00$ 23,527.00$ 7.38$ 24,804.18$ 5.00$ 16,805.00$ 3.00$ 10,083.00$ 11 Remove Tree with Roots EA 4 1,900.00$ 7,600.00$ 1,725.00$ 6,900.00$ 2,000.00$ 8,000.00$ 3,775.00$ 15,100.00$ 3,360.00$ 13,440.00$ 4,000.00$ 16,000.00$ 12 Remove Wood Fence LF 179 8.00$ 1,432.00$ 4.60$ 823.40$ 15.00$ 2,685.00$ 21.79$ 3,900.41$ 12.00$ 2,148.00$ 20.00$ 3,580.00$ 13 Relocate Metal Fence LF 67 120.00$ 8,040.00$ 49.33$ 3,305.11$ 120.00$ 8,040.00$ 80.00$ 5,360.00$ 77.00$ 5,159.00$ 125.00$ 8,375.00$ 14 Relocate Sliding Gate on Metal Track LF 46 80.00$ 3,680.00$ 70.60$ 3,247.60$ 120.00$ 5,520.00$ 85.00$ 3,910.00$ 98.00$ 4,508.00$ 175.00$ 8,050.00$ 15 Remove and Replace Brick Fence LF 5 300.00$ 1,500.00$ 174.11$ 870.55$ 100.00$ 3,000.00$ 560.00$ 2,800.00$ 219.00$ 1,095.00$ 500.00$ 2,500.00$ 16 Remove and Relocate Signs EA 6 500.00$ 3,000.00$ 287.50$ 1,725.00$ 200.00$ 1,200.00$ 300.00$ 1,800.00$ 330.00$ 1,980.00$ 300.00$ 1,800.00$ 17 Install 6" Concrete Sidewalk, Driveway and Handicap Ramp SF 28,340 13.00$ 368,420.00$ 13.99$ 396,476.60$ 14.50$ 410,930.00$ 17.25$ 488,865.00$ 12.00$ 340,080.00$ 20.00$ 566,800.00$ 18 Install Concrete Rolled Curb LF 537 69.00$ 37,053.00$ 59.71$ 32,064.27$ 70.00$ 37,590.00$ 40.00$ 21,480.00$ 45.00$ 24,165.00$ 65.00$ 34,905.00$ 19 Hot Mix Asphalt (3" AC/11" AB) SF 3,361 6.00$ 20,166.00$ 8.63$ 29,005.43$ 13.00$ 43,693.00$ 3.87$ 13,007.07$ 10.00$ 33,610.00$ 8.00$ 26,888.00$ 20 Aggregate Base CY 115 75.00$ 8,625.00$ 316.25$ 36,368.75$ 50.00$ 5,750.00$ 134.04$ 15,414.60$ 80.00$ 9,200.00$ 300.00$ 34,500.00$ 21 Relocate Sanitary Sewer Clean-Out EA 2 1,000.00$ 2,000.00$ 1,480.63$ 2,961.26$ 1,000.00$ 2,000.00$ 2,100.00$ 4,200.00$ 1,100.00$ 2,200.00$ 3,500.00$ 7,000.00$ 22 Traffic Stripes and Pavement Markings LS 1 15,000.00$ 15,000.00$ 5,750.00$ 5,750.00$ 4,990.00$ 4,990.00$ 10,751.40$ 10,751.40$ 11,000.00$ 11,000.00$ 5,000.00$ 5,000.00$ 23 Restoration LS 1 38,000.00$ 38,000.00$ 14,375.00$ 14,375.00$ 20,000.00$ 20,000.00$ 10,000.00$ 10,000.00$ 32,000.00$ 32,000.00$ 10,000.00$ 10,000.00$ CONSTRUCTION COST 651,016.50$ 660,543.90$ 717,096.00$ 760,594.48$ 795,565.00$ 879,289.00$ Lowest Bidder
FBD Vanguard Construction, Inc.
Livermore, CA
Avison Construction, Inc.
Madera, CA
MidCal Pipeline & Utilities, Inc.
Merced, CA
TBS Contractors George Reed, Inc.
Modesto, CA
United Pavement Maintenance, Inc.
Hughson, CA