Text extracted from the city's file for reading and search. Open the original on cityofmerced.legistar1.com. That file is the official record.

1 Quote #: Q22-1199
Date: January 20, 2022
Project: Little Angels Park
City: Merced
Sales Rep - Email: Kasanna Coulter -
[email protected]
Terms: Net 10dys / Install
Park Planet
a Division of Park Associates Inc
415 Elm Street
Red Bluff California 96080
(530) 244-6116
Quoted To:

City of Merced
678 West 18th Street
Merced, CA 95340
Contact: Ken Elwin
Phone: (209) 385-6800 / Email: [email protected] # Description Vendor Item No Qty Rate Amount

PLAYGROUND EQUIPMENT
1 Custom Round 5 Steel Play System..SN: R502BD7AA PlayCraft PR-R5 1 45,343.00 45,343.00 2 5-12 Age Appropriate Sign (HDPE) PlayCraft A2-1303 1 917.00 917.00 3 Material Surcharge:

To offset the increasing cost of materials. It is a separate line item so that it can be removed later when/if material prices go back to normal.

PlayCraft Surcharge 1 7,988.00 7,988.00

ITEMS NOT SPECIFICALLY PRICED
4 Wood Fiber - Chinese Camp Park Planet Wood Fiber 70 17.00 1,190.00

DISCOUNT
5 CMAS Discount
Vendor ID: 4-16-78-0038E-Sup 2:

CMAS Discount-

CMAS-TX
1 -5,425.00 -5,425.00

FREIGHT
6 PlayCraft Freight
**PlayCraft shipping pallet dimensions can reach upwards of 4'W x 8'H x 18'L and will be delivered on a 53' dry-van WITHOUT a liftgate. Offloading is the CUSTOMER'S
responsibility and is NOT included in shipping costs. (2) Forklifts or (1) Forklift with extended forks and a capacity of greater than 5,000lbs will be required to offload the pallet(s).

Please discuss offloading options with an Park Planet
representative PRIOR to placing an order.

PlayCraft PCF 1 3,400.00 3,400.00
7 Bettendorf Freight Bettendorf
Enterprises
BDF 1 650.00 650.00

IMPORTANT INFO
8 LEAD TIMES: Equipment on this quote has a current lead time of 18-20 weeks. Please discuss the timeline of your project and possible storage needs with your Park Planet rep before ordering.

Installation by Park Associates Inc. CA - Lic# 959805 DIR# PW-LR-1000423561 Prevailing Wage 9 Installation assumes normal digging conditions with standard bobcat & auger. Bobcat & concrete truck access required. 10 IF APPLICABLE:

1. Park Planet installers are not signatory to any unions and will not sign any PLA for the installation of the playground or special playground surfacing. The following supply and/or installation estimates do not include signing a PLA or paying any union labor or fees. All of the labor quoted herein will need to be excluded from a PLA agreement and union labor

QUOTEQUOTE
2 # Description Vendor Item No Qty Rate Amount
requirement waived by the purchasing agency, owner or
District.

2. Skilled & Trained Workforce – If this project is a Lease Lease-Back, or Design-Build Project, or a contract that triggers the Skilled and Trained Workforce requirements for a Public Works project, please contact Park Planet
immediately. The Following estimate for equipment and/or labor does NOT include such compliance. Park Planet and their subcontractors will NOT comply with Skilled and Trained Workforce labor and reporting. Park Planet’s portion of work (and our subcontractor’s work) will need to fall within an exception or waiver to the Skilled and Trained Workforce requirements or our estimate will not be valid.

REMOVAL OF EXISTING EQUIPMENT
11 Removal and disposal of existing equipment Park
Associates
Inc.

INST-CA 1 4,000.00 4,000.00

SITE PREPARATION
12 Removal and disposal of existing surfacing Park
Associates
Inc.

INST-CA 1 6,667.00 6,667.00
13 Installation of temp fencing around work area while project is under construction
Park
Associates
Inc.

INST-CA 1 2,533.00 2,533.00

INSTALLATION OF NEW PLAYGROUND EQUIPMENT
14 Installation of new play equipment Park
Associates
Inc.

INST-CA 1 31,333.00 31,333.00
15 Installation of new wood fiber surfacing Park
Associates
Inc.

INST-CA 1 4,400.00 4,400.00
16 Third-Party CPS Inspection Park
Associates
Inc.

Safe-2-Play 1 765.00 765.00
17 Payment & Performance Bond - *Subject to surety approval Park Planet BOND 1 2,594.03 2,594.03 18 Exclusions:

Storage of playgrounds until installation
Site preparation not specifically stated.

Site is assumed flat and suitable for construction.

Drainage Consideration
Inspections or applicable permits and fees
Removal of obstacles to reach construction site.

Site security
*
Additional fees may apply if Bonding or Special Insurance required*
**Location and Marking of utility, plumbing and irrigation lines is the responsibility of the customer. Park Planet is not responsible for repairing unmarked underground utilities and pipes. **
By signing below, you acknowledge and agree to our
Contract; Exclusions, Conditions & Payment Terms, which are to be included in, and supersede any additional contracts or sub-contract agreements made separately based on this "Estimate". Unless otherwise specified above we Exclude Responsibility for: material delivery &/or offloading
equipment, storing of equipment, removal of packaging
accumulated by equipment supplied by others, project
security, landscape & hardscape repair based on access
route to site, delays or returns due to layout conflicts, locating underground utilities; utilities, pipes, obstructions in work area, conditions unforeseen and/or not disclosed at time of estimate, permits, engineering, material testing, soil samples.

Conditions: Grades; stable, compacted, & workable (rough grade to be taken + or - one tenth of one inch), adequate access to work site provided for workmen, materials, tools & equipment. Quote assumes all labor to be completed without interruption.
3 Sub Total 106,355.03
CA-Merced-Merced (8.25%) 4,126.07
Total $110,481.10
QUOTE GOOD FOR 30 DAYS - DUE TO THE CURRENT INDUSTRY WIDE VOLATILITY OF STEEL, AFTER 30 DAYS STEEL PRICES MAY ADJUST.

CURRENTLY EXPERIENCING SIGNIFICANTLY EXTENDED LEAD TIMES DUE TO NATIONWIDE TRANSPORTATION DELAYS - LEAD TIMES MAY EXCEED 14 WEEKS, PLEASE DISCUSS WITH A PARK PLANET REPRESENTATIVE.

ORDER / DELIVERY INFORMATION:

A PURCHASE ORDER OR SIGNED CHANGE ORDER MUST BE RECEIVED BEFORE ADDITIONAL EQUIPMENT, INSTALLATION, OR SERVICES CAN PROCEED. IF PAYING BY CREDIT CARD, A SURCHARGE WILL BE ASSESSED ON PAYMENT AMOUNT FOR 3.5% VISA/MC OR 5% AMEX.

Authorized Signature: ___________________________________________________________ Date:_____________________ **Purchasing agent who is authorized to enter into binding agreement for quoted entity. **By signing this quote, I have read and agree to the quote Terms & Conditions listed below, on the following 2 pages. 4 TERMS & CONDITIONS

1. General Notes
*Assembly and Installation NOT included unless otherwise noted *Payment and Performance bonds are NOT included unless otherwise stated. If required, additional charges will apply. Please call for details! *Customer responsible for quoted quantities and model numbers, please check! *Price reflects quoted quantity. Please request revision if alternate quantity is desired.

2. Payment / Ordering
*Most repeat customers are given the terms of 50% Deposit with order; Remainder within 30 Days from Delivery. *Others require a onepage credit application or payment with order *TO ORDER, please sign quote and return via email or fax to avoid any shipping delays.  Fax or email copy deemed to be legal equivalent of original.  If Payment with Order is required, please sign quote below and return with payment.  All past due accounts subject to 1 ½% monthly finance charge.  In the event legal action is required to effect collection venue shall be Red Bluff, CA.

3. Shipping / Unloading
*Shipped by Common Carrier – Customer will need 2 to 4 people to unload.  Liftgate NOT included.  Items will be boxed and / or stretch wrapped to pallets and customer is responsible for offloading.  Delivery Drivers do NOT unload **IMPORTANT:  Customer is responsible for receiving and checking quantities and condition at time of delivery Please note any shortages or damages on delivery copy.
*Notwithstanding anything to the contrary in any Contract Documents, Customer understands that estimated shipment times for materials are an estimate only.

We have no control over shipment dates. We thus make no guarantee to Owner or Customer regarding the projected shipment dates for materials and shall not be liable for any loss caused by the timing of shipments.

4. Engineered Wood Fiber
*Customer to provide access for Engineered Wood Fiber delivery with tractor truck and 53’ trailer. *Compaction of the Engineered Wood Fiber is NOT included in the installation cost, if desired, please request an updated proposal.

5. General Notes for Purchased Installation
*Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders, prep work, flat work, grading, rerouting of water, electric, drainage or sprinkler lines unless otherwise noted in the proposal *Demo of existing equipment or safety surfacing is NOT included unless otherwise stated in the proposal *ROCK CLAUSE: Pricing is based on normal soil conditions which would allow an auger on a tractor to dig footings. If rocks/boulders interfere with the progress of the excavation, additional fees may apply.
*ACCESS CLAUSE: Installation based on clear access to area. Crane service is NOT included.  Customer to provide access for bobcat to work area, bobcat will be provided by installer. Minimum access shall be 7’ wide and 7’ high.  If adequate access is not provided additional charges may apply and repairs to landscape and irrigation may be required. Customer is responsible for any repairs to landscape if proper access is not provided. *UTILITY CLAUSE: Unless stated in writing in the quote proposal, installation does not include marking of utilities by Dig Alert or other similar entities.

Customer can, however, call Dig Alert directly. Dig Alert CANNOT locate any private lines, PVC or plastic water lines.  Installation does NOT include repair or relocating any underground utilities, such as drainage, irrigation, live water lines, main low voltage lines, gas, electrical, communication, or sewer etc.

Customers responsibility to provide locations of any utilities prior to commencement of work. *Customer is responsible for all landscape repairs such as, but not limited to damaged trees, bushes, lawn, curbing, sidewalks and/or asphalt paving caused by materials truck and/or 2ton bobcat needed to complete project. *Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders unless otherwise noted *Before we proceed with the playground installation, the playground area MUST be compacted, be free of debris, and excavated accordingly.  Please call for details.
*Concrete pad for surface mount items NOT included and MUST be provided by customer unless otherwise stated. *Surface mount anchoring to asphalt and paver areas is NOT included unless otherwise stated. *Private Utility Locator is NOT included unless otherwise noted.  Private Utility Locator CANNOT locate any PVC or plastic water lines *Installation does NOT include saw cutting and/or core drilling unless otherwise noted *Installation does NOT include jackhammering.  Please call for details. *Area MUST have normal soil conditions and be level.
*All Athletic Equipment Goals such as soccer, football, etc, install location MUST be marked out by customer prior to installation, if installation was purchased.

6. Temporary Fencing
*Security guards and/or temporary fencing to prevent injuries, vandalism and/or accidental damage to install area or to the rubberized surface while it sets is NOT included unless noted on quote.  If desired, the installers can put up caution tape, but Temporary Fencing is recommended.  Although the fencing, if provided, is intended to provide this security, the overall security of the property is ultimately the responsibility of customer.  We are not responsible for any vandalism or injuries even with the provision of the fencing.

7. ADA Access
*Play Equipment MUST be installed over an impactabsorbing surface such as ADA compliant Engineered Wood Fiber or Rubber Surfacing. If not quoted, please call for details.
*This area is NOT ADA compliant without the installation of compliant surfacing and an accessible route up to and into the playground area. Please call for details.

8. PouredinPlace Rubber Surfacing
*Rubber Surfacing cure time is normally 4872 hours and can vary depending on weather conditions. *Rubber Surfacing cannot be installed during extreme weather conditions and may also not be installed if rain or frost is forecast during the cure time. *48Hour Manned Security is NOT included for rubber.

9. Shade Shelters (non DSA)
*Shade Shelter installation price EXCLUDES – unless otherwise stated in this quote engineering, drawings, calculations, permits, permit submittal, site plans, special inspections, soil reports, impact fees, special assessment fees. Customer is responsible for any and all of these items if required by the City/County. *Shade Shelter manufacture time is 8 weeks. Permitting can add 24 weeks or more to lead time. PLEASE NOTE: Shade Orders are NOT released into production until permit is issued!
*Shade Shelter installation price EXCLUDES concrete pad, footings, masonry columns, electrical wiring and lights unless otherwise noted.

5 TERMS & CONDITIONS (Continued)

10. Shade Shelters (DSA)
**8-10 Week lead time is AFTER DSA approval by your architect of choice * Customer to receive shade shelter.  If receiving by us is needed, please call for pricing and details! * Job to be completed in one mobilization. Additional moves will be additional pricing if we are required to remobilize due to schedule issues, stop work or a delay in work not caused by us.
*Pricing does NOT include, architectural drawings, site/plot plans, DSA submittal fees, job site inspector fees, shop welding inspection fees, and/or permits *DSA inplant Welding Inspector to be hired by the School District. Welding Inspector fee has NOT been quoted. *School District / Architect responsible for submission of plans to DSA for DSA approval *Fabrication cannot start until inspections have been coordinated, colors have been selected, and approved plans received. *Pricing does NOT include footings, steel cages, anchor bolts, or erecting of shade shelter unless otherwise noted.

11. Prevailing Wages
*Prevailing Wages NOT included unless otherwise noted. (ie: Davis Bacon, TERO, ect.) If this is a Prevailing Wage project, please request alternate pricing. *If Prevailing Wages / Davis Bacon Wages were INCLUDED, all other special work fees NOT included Additional Labor Charges may apply if alternate labor is required.
*If DIR Project Registration is required, work may not begin until we receive DIR Project ID number. *Park Planet does not meet the Skilled & Trained Workforce Requirements and will not participate in same. Park Planet will not sign any PLA's for Union Work and is not signatory to any unions.

12. Indemnity Provision
*Notwithstanding anything to the contrary in any Contract Documents we shall have no duty to defend or indemnify Owner, Customer, or any other party we agree to defend or indemnify in any Contract Documents for that portion of any claim arising out of the comparative fault of any party we agree to defend or indemnify in any Contract Documents.

13. Park Planet General Insurance
Call for Proof of Insurance & W-9
1 Quote #: Q22-1195
Date: January 20, 2022
Project: 12th and G Street Park
City: Merced
Sales Rep - Email: Kasanna Coulter -
[email protected]
Terms: Net 10dys / Install
Park Planet
a Division of Park Associates Inc
415 Elm Street
Red Bluff California 96080
(530) 244-6116
Quoted To:

City of Merced
678 West 18th Street
Merced, CA 95340
Contact: Bev Daniels
Phone: 209-385-6832 / Email:
# Description Vendor Item No Qty Rate Amount

PLAYGROUND EQUIPMENT
1 Custom Round 5 Steel Play System..SN: R509098BB PlayCraft PR-R5 1 45,710.00 45,710.00 2 5-12 Age Appropriate Sign (HDPE) PlayCraft A2-1303 1 917.00 917.00 3 Material Surcharge:

To offset the increasing cost of materials. It is a separate line item so that it can be removed later when/if material prices go back to normal.

PlayCraft Surcharge 1 8,050.00 8,050.00

ITEMS NOT SPECIFICALLY PRICED
4 Wood Fiber - Chinese Camp Park Planet Wood Fiber 105 17.00 1,785.00

DISCOUNT
5 CMAS Discount
Vendor ID: 4-16-78-0038E-Sup 2:

CMAS Discount-

CMAS-TX
1 -5,468.00 -5,468.00

FREIGHT
6 PlayCraft Freight
**PlayCraft shipping pallet dimensions can reach upwards of 4'W x 8'H x 18'L and will be delivered on a 53' dry-van WITHOUT a liftgate. Offloading is the CUSTOMER'S
responsibility and is NOT included in shipping costs. (2) Forklifts or (1) Forklift with extended forks and a capacity of greater than 5,000lbs will be required to offload the pallet(s).

Please discuss offloading options with an Park Planet
representative PRIOR to placing an order.

PlayCraft PCF 1 3,400.00 3,400.00
7 Bettendorf Freight Bettendorf
Enterprises
BDF 2 650.00 1,300.00

IMPORTANT INFO
8 LEAD TIMES: Equipment on this quote has a current lead time of 18-20 weeks. Please discuss the timeline of your project and possible storage needs with your Park Planet rep before ordering.

Installation by Park Associates Inc. CA - Lic# 959805 DIR# PW-LR-1000423561 Prevailing Wage 9 Installation assumes normal digging conditions with standard bobcat & auger. Bobcat & concrete truck access required. 10 IF APPLICABLE:

1. Park Planet installers are not signatory to any unions and will not sign any PLA for the installation of the playground or special playground surfacing. The following supply and/or installation estimates do not include signing a PLA or paying any union labor or fees. All of the labor quoted herein will need to be excluded from a PLA agreement and union labor

QUOTEQUOTE
2 # Description Vendor Item No Qty Rate Amount
requirement waived by the purchasing agency, owner or
District.

2. Skilled & Trained Workforce – If this project is a Lease Lease-Back, or Design-Build Project, or a contract that triggers the Skilled and Trained Workforce requirements for a Public Works project, please contact Park Planet
immediately. The Following estimate for equipment and/or labor does NOT include such compliance. Park Planet and their subcontractors will NOT comply with Skilled and Trained Workforce labor and reporting. Park Planet’s portion of work (and our subcontractor’s work) will need to fall within an exception or waiver to the Skilled and Trained Workforce requirements or our estimate will not be valid.

REMOVAL OF EXISTING EQUIPMENT
11 Removal and disposal of existing equipment Park
Associates
Inc.

INST-CA 1 5,333.00 5,333.00

SITE PREPARATION
12 Removal and disposal of existing surfacing Park
Associates
Inc.

INST-CA 1 7,333.00 7,333.00
13 Installation of temp fencing around work area while project is under construction
Park
Associates
Inc.

INST-CA 1 2,467.00 2,467.00

INSTALLATION OF NEW PLAYGROUND EQUIPMENT
14 Installation of new play equipment Park
Associates
Inc.

INST-CA 1 23,624.00 23,624.00
15 Installation of wood fiber surfacing Park
Associates
Inc.

INST-CA 1 4,800.00 4,800.00
16 Third-Party CPS Inspection Park
Associates
Inc.

Safe-2-Play 1 765.00 765.00
17 Payment & Performance Bond - *Subject to surety approval Park Planet BOND 1 2,500.41 2,500.41 18 Exclusions:

Site preparation not specifically stated.

Site is assumed flat and suitable for construction.

Drainage Consideration
Inspections or applicable permits and fees
Removal of obstacles to reach construction site.

Site security
*
Additional fees may apply if Bonding or Special Insurance required*
**Location and Marking of utility, plumbing and irrigation lines is the responsibility of the customer. Park Planet is not responsible for repairing unmarked underground utilities and pipes. **
By signing below, you acknowledge and agree to our
Contract; Exclusions, Conditions & Payment Terms, which are to be included in, and supersede any additional contracts or sub-contract agreements made separately based on this "Estimate". Unless otherwise specified above we Exclude Responsibility for: material delivery &/or offloading
equipment, storing of equipment, removal of packaging
accumulated by equipment supplied by others, project
security, landscape & hardscape repair based on access
route to site, delays or returns due to layout conflicts, locating underground utilities; utilities, pipes, obstructions in work area, conditions unforeseen and/or not disclosed at time of estimate, permits, engineering, material testing, soil samples.

Conditions: Grades; stable, compacted, & workable (rough grade to be taken + or - one tenth of one inch), adequate access to work site provided for workmen, materials, tools & equipment. Quote assumes all labor to be completed without interruption.
3 Sub Total 102,516.41
CA-Merced-Merced (8.25%) 4,207.01
Total $106,723.42
QUOTE GOOD FOR 30 DAYS - DUE TO THE CURRENT INDUSTRY WIDE VOLATILITY OF STEEL, AFTER 30 DAYS STEEL PRICES MAY ADJUST.

CURRENTLY EXPERIENCING SIGNIFICANTLY EXTENDED LEAD TIMES DUE TO NATIONWIDE TRANSPORTATION DELAYS - LEAD TIMES MAY EXCEED 14 WEEKS, PLEASE DISCUSS WITH A PARK PLANET REPRESENTATIVE.

ORDER / DELIVERY INFORMATION:

A PURCHASE ORDER OR SIGNED CHANGE ORDER MUST BE RECEIVED BEFORE ADDITIONAL EQUIPMENT, INSTALLATION, OR SERVICES CAN PROCEED. IF PAYING BY CREDIT CARD, A SURCHARGE WILL BE ASSESSED ON PAYMENT AMOUNT FOR 3.5% VISA/MC OR 5% AMEX.

Authorized Signature: ___________________________________________________________ Date:_____________________ **Purchasing agent who is authorized to enter into binding agreement for quoted entity. **By signing this quote, I have read and agree to the quote Terms & Conditions listed below, on the following 2 pages. 4 TERMS & CONDITIONS

1. General Notes
*Assembly and Installation NOT included unless otherwise noted *Payment and Performance bonds are NOT included unless otherwise stated. If required, additional charges will apply. Please call for details! *Customer responsible for quoted quantities and model numbers, please check! *Price reflects quoted quantity. Please request revision if alternate quantity is desired.

2. Payment / Ordering
*Most repeat customers are given the terms of 50% Deposit with order; Remainder within 30 Days from Delivery. *Others require a onepage credit application or payment with order *TO ORDER, please sign quote and return via email or fax to avoid any shipping delays.  Fax or email copy deemed to be legal equivalent of original.  If Payment with Order is required, please sign quote below and return with payment.  All past due accounts subject to 1 ½% monthly finance charge.  In the event legal action is required to effect collection venue shall be Red Bluff, CA.

3. Shipping / Unloading
*Shipped by Common Carrier – Customer will need 2 to 4 people to unload.  Liftgate NOT included.  Items will be boxed and / or stretch wrapped to pallets and customer is responsible for offloading.  Delivery Drivers do NOT unload **IMPORTANT:  Customer is responsible for receiving and checking quantities and condition at time of delivery Please note any shortages or damages on delivery copy.
*Notwithstanding anything to the contrary in any Contract Documents, Customer understands that estimated shipment times for materials are an estimate only.

We have no control over shipment dates. We thus make no guarantee to Owner or Customer regarding the projected shipment dates for materials and shall not be liable for any loss caused by the timing of shipments.

4. Engineered Wood Fiber
*Customer to provide access for Engineered Wood Fiber delivery with tractor truck and 53’ trailer. *Compaction of the Engineered Wood Fiber is NOT included in the installation cost, if desired, please request an updated proposal.

5. General Notes for Purchased Installation
*Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders, prep work, flat work, grading, rerouting of water, electric, drainage or sprinkler lines unless otherwise noted in the proposal *Demo of existing equipment or safety surfacing is NOT included unless otherwise stated in the proposal *ROCK CLAUSE: Pricing is based on normal soil conditions which would allow an auger on a tractor to dig footings. If rocks/boulders interfere with the progress of the excavation, additional fees may apply.
*ACCESS CLAUSE: Installation based on clear access to area. Crane service is NOT included.  Customer to provide access for bobcat to work area, bobcat will be provided by installer. Minimum access shall be 7’ wide and 7’ high.  If adequate access is not provided additional charges may apply and repairs to landscape and irrigation may be required. Customer is responsible for any repairs to landscape if proper access is not provided. *UTILITY CLAUSE: Unless stated in writing in the quote proposal, installation does not include marking of utilities by Dig Alert or other similar entities.

Customer can, however, call Dig Alert directly. Dig Alert CANNOT locate any private lines, PVC or plastic water lines.  Installation does NOT include repair or relocating any underground utilities, such as drainage, irrigation, live water lines, main low voltage lines, gas, electrical, communication, or sewer etc.

Customers responsibility to provide locations of any utilities prior to commencement of work. *Customer is responsible for all landscape repairs such as, but not limited to damaged trees, bushes, lawn, curbing, sidewalks and/or asphalt paving caused by materials truck and/or 2ton bobcat needed to complete project. *Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders unless otherwise noted *Before we proceed with the playground installation, the playground area MUST be compacted, be free of debris, and excavated accordingly.  Please call for details.
*Concrete pad for surface mount items NOT included and MUST be provided by customer unless otherwise stated. *Surface mount anchoring to asphalt and paver areas is NOT included unless otherwise stated. *Private Utility Locator is NOT included unless otherwise noted.  Private Utility Locator CANNOT locate any PVC or plastic water lines *Installation does NOT include saw cutting and/or core drilling unless otherwise noted *Installation does NOT include jackhammering.  Please call for details. *Area MUST have normal soil conditions and be level.
*All Athletic Equipment Goals such as soccer, football, etc, install location MUST be marked out by customer prior to installation, if installation was purchased.

6. Temporary Fencing
*Security guards and/or temporary fencing to prevent injuries, vandalism and/or accidental damage to install area or to the rubberized surface while it sets is NOT included unless noted on quote.  If desired, the installers can put up caution tape, but Temporary Fencing is recommended.  Although the fencing, if provided, is intended to provide this security, the overall security of the property is ultimately the responsibility of customer.  We are not responsible for any vandalism or injuries even with the provision of the fencing.

7. ADA Access
*Play Equipment MUST be installed over an impactabsorbing surface such as ADA compliant Engineered Wood Fiber or Rubber Surfacing. If not quoted, please call for details.
*This area is NOT ADA compliant without the installation of compliant surfacing and an accessible route up to and into the playground area. Please call for details.

8. PouredinPlace Rubber Surfacing
*Rubber Surfacing cure time is normally 4872 hours and can vary depending on weather conditions. *Rubber Surfacing cannot be installed during extreme weather conditions and may also not be installed if rain or frost is forecast during the cure time. *48Hour Manned Security is NOT included for rubber.

9. Shade Shelters (non DSA)
*Shade Shelter installation price EXCLUDES – unless otherwise stated in this quote engineering, drawings, calculations, permits, permit submittal, site plans, special inspections, soil reports, impact fees, special assessment fees. Customer is responsible for any and all of these items if required by the City/County. *Shade Shelter manufacture time is 8 weeks. Permitting can add 24 weeks or more to lead time. PLEASE NOTE: Shade Orders are NOT released into production until permit is issued!
*Shade Shelter installation price EXCLUDES concrete pad, footings, masonry columns, electrical wiring and lights unless otherwise noted.

5 TERMS & CONDITIONS (Continued)

10. Shade Shelters (DSA)
**8-10 Week lead time is AFTER DSA approval by your architect of choice * Customer to receive shade shelter.  If receiving by us is needed, please call for pricing and details! * Job to be completed in one mobilization. Additional moves will be additional pricing if we are required to remobilize due to schedule issues, stop work or a delay in work not caused by us.
*Pricing does NOT include, architectural drawings, site/plot plans, DSA submittal fees, job site inspector fees, shop welding inspection fees, and/or permits *DSA inplant Welding Inspector to be hired by the School District. Welding Inspector fee has NOT been quoted. *School District / Architect responsible for submission of plans to DSA for DSA approval *Fabrication cannot start until inspections have been coordinated, colors have been selected, and approved plans received. *Pricing does NOT include footings, steel cages, anchor bolts, or erecting of shade shelter unless otherwise noted.

11. Prevailing Wages
*Prevailing Wages NOT included unless otherwise noted. (ie: Davis Bacon, TERO, ect.) If this is a Prevailing Wage project, please request alternate pricing. *If Prevailing Wages / Davis Bacon Wages were INCLUDED, all other special work fees NOT included Additional Labor Charges may apply if alternate labor is required.
*If DIR Project Registration is required, work may not begin until we receive DIR Project ID number. *Park Planet does not meet the Skilled & Trained Workforce Requirements and will not participate in same. Park Planet will not sign any PLA's for Union Work and is not signatory to any unions.

12. Indemnity Provision
*Notwithstanding anything to the contrary in any Contract Documents we shall have no duty to defend or indemnify Owner, Customer, or any other party we agree to defend or indemnify in any Contract Documents for that portion of any claim arising out of the comparative fault of any party we agree to defend or indemnify in any Contract Documents.

13. Park Planet General Insurance
Call for Proof of Insurance & W-9
1 Quote #: Q22-1201
Date: January 20, 2022
Project: The Love Veasley Family
Memorial Park
City: Merced
Sales Rep - Email: Kasanna Coulter -
[email protected]
Terms: Net 10dys / Install
Park Planet
a Division of Park Associates Inc
415 Elm Street
Red Bluff California 96080
(530) 244-6116
Quoted To:

City of Merced
678 West 18th Street
Merced, CA 95340
Contact: Ken Elwin
Phone: (209) 385-6800 / Email: [email protected] # Description Vendor Item No Qty Rate Amount

PLAYGROUND EQUIPMENT
1 Custom Round 5 Steel Play System..SN: R50C41E8B PlayCraft PR-R5 1 34,094.00 34,094.00 2 5-12 Age Appropriate Sign (HDPE) PlayCraft A2-1303 1 917.00 917.00 3 Material Surcharge:

To offset the increasing cost of materials. It is a separate line item so that it can be removed later when/if material prices go back to normal.

PlayCraft Surcharge 1 6,045.00 6,045.00

ITEMS NOT SPECIFICALLY PRICED
4 Wood Fiber - Chinese Camp Park Planet Wood Fiber 52 17.00 884.00

DISCOUNT
5 CMAS Discount
Vendor ID: 4-16-78-0038E-Sup 2:

CMAS Discount-

CMAS-TX
1 -4,105.60 -4,105.60

FREIGHT
6 PlayCraft Freight
**PlayCraft shipping pallet dimensions can reach upwards of 4'W x 8'H x 18'L and will be delivered on a 53' dry-van WITHOUT a liftgate. Offloading is the CUSTOMER'S
responsibility and is NOT included in shipping costs. (2) Forklifts or (1) Forklift with extended forks and a capacity of greater than 5,000lbs will be required to offload the pallet(s).

Please discuss offloading options with an Park Planet
representative PRIOR to placing an order.

PlayCraft PCF 1 2,500.00 2,500.00
7 Bettendorf Freight Bettendorf
Enterprises
BDF 1 650.00 650.00

IMPORTANT INFO
8 LEAD TIMES: Equipment on this quote has a current lead time of 18-20 weeks. Please discuss the timeline of your project and possible storage needs with your Park Planet rep before ordering.

Installation by Park Associates Inc. CA - Lic# 959805 DIR# PW-LR-1000423561 Prevailing Wage 9 Installation assumes normal digging conditions with standard bobcat & auger. Bobcat & concrete truck access required. 10 IF APPLICABLE:

1. Park Planet installers are not signatory to any unions and will not sign any PLA for the installation of the playground or special playground surfacing. The following supply and/or installation estimates do not include signing a PLA or paying any union labor or fees. All of the labor quoted herein will need to be excluded from a PLA agreement and union labor

QUOTEQUOTE
2 # Description Vendor Item No Qty Rate Amount
requirement waived by the purchasing agency, owner or
District.

2. Skilled & Trained Workforce – If this project is a Lease Lease-Back, or Design-Build Project, or a contract that triggers the Skilled and Trained Workforce requirements for a Public Works project, please contact Park Planet
immediately. The Following estimate for equipment and/or labor does NOT include such compliance. Park Planet and their subcontractors will NOT comply with Skilled and Trained Workforce labor and reporting. Park Planet’s portion of work (and our subcontractor’s work) will need to fall within an exception or waiver to the Skilled and Trained Workforce requirements or our estimate will not be valid.

REMOVAL OF EXISTING EQUIPMENT
11 Removal and disposal of existing equipment Park
Associates
Inc.

INST-CA 1 3,733.00 3,733.00

SITE PREPARATION
12 Removal and disposal of existing surfacing Park
Associates
Inc.

INST-CA 1 5,000.00 5,000.00
13 Installation of temp fencing around work area while project is under construction
Park
Associates
Inc.

INST-CA 1 2,200.00 2,200.00

INSTALLATION OF NEW PLAYGROUND EQUIPMENT
14 Installation of new play equipment Park
Associates
Inc.

INST-CA 1 17,739.00 17,739.00
15 Installation of new wood fiber surfacing Park
Associates
Inc.

INST-CA 1 3,067.00 3,067.00
16 Third-Party CPS Inspection Park
Associates
Inc.

Safe-2-Play 1 765.00 765.00
17 Payment & Performance Bond - *Subject to surety approval Park Planet BOND 1 1,837.21 1,837.21 18 Exclusions:

Storage of equipment until installation starts
Site preparation not specifically stated.

Site is assumed flat and suitable for construction.

Drainage Consideration
Inspections or applicable permits and fees
Removal of obstacles to reach construction site.

Site security
*
Additional fees may apply if Bonding or Special Insurance required*
**Location and Marking of utility, plumbing and irrigation lines is the responsibility of the customer. Park Planet is not responsible for repairing unmarked underground utilities and pipes. **
By signing below, you acknowledge and agree to our
Contract; Exclusions, Conditions & Payment Terms, which are to be included in, and supersede any additional contracts or sub-contract agreements made separately based on this "Estimate". Unless otherwise specified above we Exclude Responsibility for: material delivery &/or offloading
equipment, storing of equipment, removal of packaging
accumulated by equipment supplied by others, project
security, landscape & hardscape repair based on access
route to site, delays or returns due to layout conflicts, locating underground utilities; utilities, pipes, obstructions in work area, conditions unforeseen and/or not disclosed at time of estimate, permits, engineering, material testing, soil samples.

Conditions: Grades; stable, compacted, & workable (rough grade to be taken + or - one tenth of one inch), adequate access to work site provided for workmen, materials, tools & equipment. Quote assumes all labor to be completed without interruption.
3 Sub Total 75,325.61
CA-Merced-Merced (8.25%) 3,121.34
Total $78,446.95
QUOTE GOOD FOR 30 DAYS - DUE TO THE CURRENT INDUSTRY WIDE VOLATILITY OF STEEL, AFTER 30 DAYS STEEL PRICES MAY ADJUST.

CURRENTLY EXPERIENCING SIGNIFICANTLY EXTENDED LEAD TIMES DUE TO NATIONWIDE TRANSPORTATION DELAYS - LEAD TIMES MAY EXCEED 14 WEEKS, PLEASE DISCUSS WITH A PARK PLANET REPRESENTATIVE.

ORDER / DELIVERY INFORMATION:

A PURCHASE ORDER OR SIGNED CHANGE ORDER MUST BE RECEIVED BEFORE ADDITIONAL EQUIPMENT, INSTALLATION, OR SERVICES CAN PROCEED. IF PAYING BY CREDIT CARD, A SURCHARGE WILL BE ASSESSED ON PAYMENT AMOUNT FOR 3.5% VISA/MC OR 5% AMEX.

Authorized Signature: ___________________________________________________________ Date:_____________________ **Purchasing agent who is authorized to enter into binding agreement for quoted entity. **By signing this quote, I have read and agree to the quote Terms & Conditions listed below, on the following 2 pages. 4 TERMS & CONDITIONS

1. General Notes
*Assembly and Installation NOT included unless otherwise noted *Payment and Performance bonds are NOT included unless otherwise stated. If required, additional charges will apply. Please call for details! *Customer responsible for quoted quantities and model numbers, please check! *Price reflects quoted quantity. Please request revision if alternate quantity is desired.

2. Payment / Ordering
*Most repeat customers are given the terms of 50% Deposit with order; Remainder within 30 Days from Delivery. *Others require a onepage credit application or payment with order *TO ORDER, please sign quote and return via email or fax to avoid any shipping delays.  Fax or email copy deemed to be legal equivalent of original.  If Payment with Order is required, please sign quote below and return with payment.  All past due accounts subject to 1 ½% monthly finance charge.  In the event legal action is required to effect collection venue shall be Red Bluff, CA.

3. Shipping / Unloading
*Shipped by Common Carrier – Customer will need 2 to 4 people to unload.  Liftgate NOT included.  Items will be boxed and / or stretch wrapped to pallets and customer is responsible for offloading.  Delivery Drivers do NOT unload **IMPORTANT:  Customer is responsible for receiving and checking quantities and condition at time of delivery Please note any shortages or damages on delivery copy.
*Notwithstanding anything to the contrary in any Contract Documents, Customer understands that estimated shipment times for materials are an estimate only.

We have no control over shipment dates. We thus make no guarantee to Owner or Customer regarding the projected shipment dates for materials and shall not be liable for any loss caused by the timing of shipments.

4. Engineered Wood Fiber
*Customer to provide access for Engineered Wood Fiber delivery with tractor truck and 53’ trailer. *Compaction of the Engineered Wood Fiber is NOT included in the installation cost, if desired, please request an updated proposal.

5. General Notes for Purchased Installation
*Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders, prep work, flat work, grading, rerouting of water, electric, drainage or sprinkler lines unless otherwise noted in the proposal *Demo of existing equipment or safety surfacing is NOT included unless otherwise stated in the proposal *ROCK CLAUSE: Pricing is based on normal soil conditions which would allow an auger on a tractor to dig footings. If rocks/boulders interfere with the progress of the excavation, additional fees may apply.
*ACCESS CLAUSE: Installation based on clear access to area. Crane service is NOT included.  Customer to provide access for bobcat to work area, bobcat will be provided by installer. Minimum access shall be 7’ wide and 7’ high.  If adequate access is not provided additional charges may apply and repairs to landscape and irrigation may be required. Customer is responsible for any repairs to landscape if proper access is not provided. *UTILITY CLAUSE: Unless stated in writing in the quote proposal, installation does not include marking of utilities by Dig Alert or other similar entities.

Customer can, however, call Dig Alert directly. Dig Alert CANNOT locate any private lines, PVC or plastic water lines.  Installation does NOT include repair or relocating any underground utilities, such as drainage, irrigation, live water lines, main low voltage lines, gas, electrical, communication, or sewer etc.

Customers responsibility to provide locations of any utilities prior to commencement of work. *Customer is responsible for all landscape repairs such as, but not limited to damaged trees, bushes, lawn, curbing, sidewalks and/or asphalt paving caused by materials truck and/or 2ton bobcat needed to complete project. *Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders unless otherwise noted *Before we proceed with the playground installation, the playground area MUST be compacted, be free of debris, and excavated accordingly.  Please call for details.
*Concrete pad for surface mount items NOT included and MUST be provided by customer unless otherwise stated. *Surface mount anchoring to asphalt and paver areas is NOT included unless otherwise stated. *Private Utility Locator is NOT included unless otherwise noted.  Private Utility Locator CANNOT locate any PVC or plastic water lines *Installation does NOT include saw cutting and/or core drilling unless otherwise noted *Installation does NOT include jackhammering.  Please call for details. *Area MUST have normal soil conditions and be level.
*All Athletic Equipment Goals such as soccer, football, etc, install location MUST be marked out by customer prior to installation, if installation was purchased.

6. Temporary Fencing
*Security guards and/or temporary fencing to prevent injuries, vandalism and/or accidental damage to install area or to the rubberized surface while it sets is NOT included unless noted on quote.  If desired, the installers can put up caution tape, but Temporary Fencing is recommended.  Although the fencing, if provided, is intended to provide this security, the overall security of the property is ultimately the responsibility of customer.  We are not responsible for any vandalism or injuries even with the provision of the fencing.

7. ADA Access
*Play Equipment MUST be installed over an impactabsorbing surface such as ADA compliant Engineered Wood Fiber or Rubber Surfacing. If not quoted, please call for details.
*This area is NOT ADA compliant without the installation of compliant surfacing and an accessible route up to and into the playground area. Please call for details.

8. PouredinPlace Rubber Surfacing
*Rubber Surfacing cure time is normally 4872 hours and can vary depending on weather conditions. *Rubber Surfacing cannot be installed during extreme weather conditions and may also not be installed if rain or frost is forecast during the cure time. *48Hour Manned Security is NOT included for rubber.

9. Shade Shelters (non DSA)
*Shade Shelter installation price EXCLUDES – unless otherwise stated in this quote engineering, drawings, calculations, permits, permit submittal, site plans, special inspections, soil reports, impact fees, special assessment fees. Customer is responsible for any and all of these items if required by the City/County. *Shade Shelter manufacture time is 8 weeks. Permitting can add 24 weeks or more to lead time. PLEASE NOTE: Shade Orders are NOT released into production until permit is issued!
*Shade Shelter installation price EXCLUDES concrete pad, footings, masonry columns, electrical wiring and lights unless otherwise noted.

5 TERMS & CONDITIONS (Continued)

10. Shade Shelters (DSA)
**8-10 Week lead time is AFTER DSA approval by your architect of choice * Customer to receive shade shelter.  If receiving by us is needed, please call for pricing and details! * Job to be completed in one mobilization. Additional moves will be additional pricing if we are required to remobilize due to schedule issues, stop work or a delay in work not caused by us.
*Pricing does NOT include, architectural drawings, site/plot plans, DSA submittal fees, job site inspector fees, shop welding inspection fees, and/or permits *DSA inplant Welding Inspector to be hired by the School District. Welding Inspector fee has NOT been quoted. *School District / Architect responsible for submission of plans to DSA for DSA approval *Fabrication cannot start until inspections have been coordinated, colors have been selected, and approved plans received. *Pricing does NOT include footings, steel cages, anchor bolts, or erecting of shade shelter unless otherwise noted.

11. Prevailing Wages
*Prevailing Wages NOT included unless otherwise noted. (ie: Davis Bacon, TERO, ect.) If this is a Prevailing Wage project, please request alternate pricing. *If Prevailing Wages / Davis Bacon Wages were INCLUDED, all other special work fees NOT included Additional Labor Charges may apply if alternate labor is required.
*If DIR Project Registration is required, work may not begin until we receive DIR Project ID number. *Park Planet does not meet the Skilled & Trained Workforce Requirements and will not participate in same. Park Planet will not sign any PLA's for Union Work and is not signatory to any unions.

12. Indemnity Provision
*Notwithstanding anything to the contrary in any Contract Documents we shall have no duty to defend or indemnify Owner, Customer, or any other party we agree to defend or indemnify in any Contract Documents for that portion of any claim arising out of the comparative fault of any party we agree to defend or indemnify in any Contract Documents.

13. Park Planet General Insurance
Call for Proof of Insurance & W-9
1 Quote #: Q22-1196
Date: January 20, 2022
Project: Benjamin Tannager Park
City: Merced
Sales Rep - Email: Kasanna Coulter -
[email protected]
Terms: Net 10dys / Install
Park Planet
a Division of Park Associates Inc
415 Elm Street
Red Bluff California 96080
(530) 244-6116
Quoted To:

City of Merced
678 West 18th Street
Merced, CA 95340
Contact: Ken Elwin
Phone: (209) 385-6800 / Email: [email protected] # Description Vendor Item No Qty Rate Amount

PLAYGROUND EQUIPMENT
1 Custom Round 5 Steel Play System..SN: R505D05AB PlayCraft PR-R5 1 31,475.00 31,475.00 2 Playhouse
Custom Round 5 Steel Play System..SN: R50A3382B
PlayCraft PR-R5 1 5,977.00 5,977.00
3 5-12 Age Appropriate Sign (HDPE) PlayCraft A2-1303 1 917.00 917.00 4 Material Surcharge:

To offset the increasing cost of materials. It is a separate line item so that it can be removed later when/if material prices go back to normal.

PlayCraft Surcharge 1 6,745.00 6,745.00

ITEMS NOT SPECIFICALLY PRICED
5 Wood Fiber - Chinese Camp Park Planet Wood Fiber 75 17.00 1,275.00

DISCOUNT
6 CMAS Discount
Vendor ID: 4-16-78-0038E-Sup 2:

CMAS Discount-

CMAS-TX
1 -4,511.00 -4,511.00

FREIGHT
7 PlayCraft Freight
**PlayCraft shipping pallet dimensions can reach upwards of 4'W x 8'H x 18'L and will be delivered on a 53' dry-van WITHOUT a liftgate. Offloading is the CUSTOMER'S
responsibility and is NOT included in shipping costs. (2) Forklifts or (1) Forklift with extended forks and a capacity of greater than 5,000lbs will be required to offload the pallet(s).

Please discuss offloading options with an Park Planet
representative PRIOR to placing an order.

PlayCraft PCF 1 2,600.00 2,600.00
8 Bettendorf Freight Bettendorf
Enterprises
BDF 1 650.00 650.00

IMPORTANT INFO
9 LEAD TIMES: Equipment on this quote has a current lead time of 18-20 weeks. Please discuss the timeline of your project and possible storage needs with your Park Planet rep before ordering.

Installation by Park Associates Inc. CA - Lic# 959805 DIR# PW-LR-1000423561 Prevailing Wage 10 Installation assumes normal digging conditions with standard bobcat & auger. Bobcat & concrete truck access required. 11 IF APPLICABLE:

1. Park Planet installers are not signatory to any unions and will not sign any PLA for the installation of the playground or special playground surfacing. The following supply and/or installation estimates do not include signing a PLA or paying

QUOTEQUOTE
2 # Description Vendor Item No Qty Rate Amount
any union labor or fees. All of the labor quoted herein will need to be excluded from a PLA agreement and union labor requirement waived by the purchasing agency, owner or
District.

2. Skilled & Trained Workforce – If this project is a Lease Lease-Back, or Design-Build Project, or a contract that triggers the Skilled and Trained Workforce requirements for a Public Works project, please contact Park Planet
immediately. The Following estimate for equipment and/or labor does NOT include such compliance. Park Planet and their subcontractors will NOT comply with Skilled and Trained Workforce labor and reporting. Park Planet’s portion of work (and our subcontractor’s work) will need to fall within an exception or waiver to the Skilled and Trained Workforce requirements or our estimate will not be valid.

REMOVAL OF EXISTING EQUIPMENT
12 Removal and disposal of existing equipment Park
Associates
Inc.

INST-CA 1 3,893.00 3,893.00

SITE PREPARATION
13 Removal and disposal of existing surfacing Park
Associates
Inc.

INST-CA 1 5,345.00 5,345.00
14 Installation of temp fencing around work area while project is under construction
Park
Associates
Inc.

INST-CA 1 1,795.00 1,795.00

INSTALLATION OF NEW PLAYGROUND EQUIPMENT
15 Installation of new play equipment Park
Associates
Inc.

INST-CA 1 19,788.00 19,788.00
16 Installation of new wood fiber surfacing Park
Associates
Inc.

INST-CA 1 3,420.00 3,420.00
17 Third-Party CPS Inspection Park
Associates
Inc.

Safe-2-Play 1 765.00 765.00
18 Payment & Performance Bond - *Subject to surety approval Park Planet BOND 1 2,003.34 2,003.34 19 Exclusions:

Site preparation not specifically stated.

Site is assumed flat and suitable for construction.

Drainage Consideration
Inspections or applicable permits and fees
Removal of obstacles to reach construction site.

Site security
*
Additional fees may apply if Bonding or Special Insurance required*
**Location and Marking of utility, plumbing and irrigation lines is the responsibility of the customer. Park Planet is not responsible for repairing unmarked underground utilities and pipes. **
By signing below, you acknowledge and agree to our
Contract; Exclusions, Conditions & Payment Terms, which are to be included in, and supersede any additional contracts or sub-contract agreements made separately based on this "Estimate". Unless otherwise specified above we Exclude Responsibility for: material delivery &/or offloading
equipment, storing of equipment, removal of packaging
accumulated by equipment supplied by others, project
security, landscape & hardscape repair based on access
route to site, delays or returns due to layout conflicts, locating underground utilities; utilities, pipes, obstructions in work area, conditions unforeseen and/or not disclosed at time of estimate, permits, engineering, material testing, soil samples.

Conditions: Grades; stable, compacted, & workable (rough grade to be taken + or - one tenth of one inch), adequate 3 Sub Total 82,137.34
CA-Merced-Merced (8.25%) 3,454.94
Total $85,592.28
QUOTE GOOD FOR 30 DAYS - DUE TO THE CURRENT INDUSTRY WIDE VOLATILITY OF STEEL, AFTER 30 DAYS STEEL PRICES MAY ADJUST.

CURRENTLY EXPERIENCING SIGNIFICANTLY EXTENDED LEAD TIMES DUE TO NATIONWIDE TRANSPORTATION DELAYS - LEAD TIMES MAY EXCEED 14 WEEKS, PLEASE DISCUSS WITH A PARK PLANET REPRESENTATIVE. # Description Vendor Item No Qty Rate Amount
access to work site provided for workmen, materials, tools & equipment. Quote assumes all labor to be completed without interruption.

ORDER / DELIVERY INFORMATION:

A PURCHASE ORDER OR SIGNED CHANGE ORDER MUST BE RECEIVED BEFORE ADDITIONAL EQUIPMENT, INSTALLATION, OR SERVICES CAN PROCEED. IF PAYING BY CREDIT CARD, A SURCHARGE WILL BE ASSESSED ON PAYMENT AMOUNT FOR 3.5% VISA/MC OR 5% AMEX.

Authorized Signature: ___________________________________________________________ Date:_____________________ **Purchasing agent who is authorized to enter into binding agreement for quoted entity. **By signing this quote, I have read and agree to the quote Terms & Conditions listed below, on the following 2 pages. 4 TERMS & CONDITIONS

1. General Notes
*Assembly and Installation NOT included unless otherwise noted *Payment and Performance bonds are NOT included unless otherwise stated. If required, additional charges will apply. Please call for details! *Customer responsible for quoted quantities and model numbers, please check! *Price reflects quoted quantity. Please request revision if alternate quantity is desired.

2. Payment / Ordering
*Most repeat customers are given the terms of 50% Deposit with order; Remainder within 30 Days from Delivery. *Others require a onepage credit application or payment with order *TO ORDER, please sign quote and return via email or fax to avoid any shipping delays.  Fax or email copy deemed to be legal equivalent of original.  If Payment with Order is required, please sign quote below and return with payment.  All past due accounts subject to 1 ½% monthly finance charge.  In the event legal action is required to effect collection venue shall be Red Bluff, CA.

3. Shipping / Unloading
*Shipped by Common Carrier – Customer will need 2 to 4 people to unload.  Liftgate NOT included.  Items will be boxed and / or stretch wrapped to pallets and customer is responsible for offloading.  Delivery Drivers do NOT unload **IMPORTANT:  Customer is responsible for receiving and checking quantities and condition at time of delivery Please note any shortages or damages on delivery copy.
*Notwithstanding anything to the contrary in any Contract Documents, Customer understands that estimated shipment times for materials are an estimate only.

We have no control over shipment dates. We thus make no guarantee to Owner or Customer regarding the projected shipment dates for materials and shall not be liable for any loss caused by the timing of shipments.

4. Engineered Wood Fiber
*Customer to provide access for Engineered Wood Fiber delivery with tractor truck and 53’ trailer. *Compaction of the Engineered Wood Fiber is NOT included in the installation cost, if desired, please request an updated proposal.

5. General Notes for Purchased Installation
*Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders, prep work, flat work, grading, rerouting of water, electric, drainage or sprinkler lines unless otherwise noted in the proposal *Demo of existing equipment or safety surfacing is NOT included unless otherwise stated in the proposal *ROCK CLAUSE: Pricing is based on normal soil conditions which would allow an auger on a tractor to dig footings. If rocks/boulders interfere with the progress of the excavation, additional fees may apply.
*ACCESS CLAUSE: Installation based on clear access to area. Crane service is NOT included.  Customer to provide access for bobcat to work area, bobcat will be provided by installer. Minimum access shall be 7’ wide and 7’ high.  If adequate access is not provided additional charges may apply and repairs to landscape and irrigation may be required. Customer is responsible for any repairs to landscape if proper access is not provided. *UTILITY CLAUSE: Unless stated in writing in the quote proposal, installation does not include marking of utilities by Dig Alert or other similar entities.

Customer can, however, call Dig Alert directly. Dig Alert CANNOT locate any private lines, PVC or plastic water lines.  Installation does NOT include repair or relocating any underground utilities, such as drainage, irrigation, live water lines, main low voltage lines, gas, electrical, communication, or sewer etc.

Customers responsibility to provide locations of any utilities prior to commencement of work. *Customer is responsible for all landscape repairs such as, but not limited to damaged trees, bushes, lawn, curbing, sidewalks and/or asphalt paving caused by materials truck and/or 2ton bobcat needed to complete project. *Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders unless otherwise noted *Before we proceed with the playground installation, the playground area MUST be compacted, be free of debris, and excavated accordingly.  Please call for details.
*Concrete pad for surface mount items NOT included and MUST be provided by customer unless otherwise stated. *Surface mount anchoring to asphalt and paver areas is NOT included unless otherwise stated. *Private Utility Locator is NOT included unless otherwise noted.  Private Utility Locator CANNOT locate any PVC or plastic water lines *Installation does NOT include saw cutting and/or core drilling unless otherwise noted *Installation does NOT include jackhammering.  Please call for details. *Area MUST have normal soil conditions and be level.
*All Athletic Equipment Goals such as soccer, football, etc, install location MUST be marked out by customer prior to installation, if installation was purchased.

6. Temporary Fencing
*Security guards and/or temporary fencing to prevent injuries, vandalism and/or accidental damage to install area or to the rubberized surface while it sets is NOT included unless noted on quote.  If desired, the installers can put up caution tape, but Temporary Fencing is recommended.  Although the fencing, if provided, is intended to provide this security, the overall security of the property is ultimately the responsibility of customer.  We are not responsible for any vandalism or injuries even with the provision of the fencing.

7. ADA Access
*Play Equipment MUST be installed over an impactabsorbing surface such as ADA compliant Engineered Wood Fiber or Rubber Surfacing. If not quoted, please call for details.
*This area is NOT ADA compliant without the installation of compliant surfacing and an accessible route up to and into the playground area. Please call for details.

8. PouredinPlace Rubber Surfacing
*Rubber Surfacing cure time is normally 4872 hours and can vary depending on weather conditions. *Rubber Surfacing cannot be installed during extreme weather conditions and may also not be installed if rain or frost is forecast during the cure time. *48Hour Manned Security is NOT included for rubber.

9. Shade Shelters (non DSA)
*Shade Shelter installation price EXCLUDES – unless otherwise stated in this quote engineering, drawings, calculations, permits, permit submittal, site plans, special inspections, soil reports, impact fees, special assessment fees. Customer is responsible for any and all of these items if required by the City/County. *Shade Shelter manufacture time is 8 weeks. Permitting can add 24 weeks or more to lead time. PLEASE NOTE: Shade Orders are NOT released into production until permit is issued!
*Shade Shelter installation price EXCLUDES concrete pad, footings, masonry columns, electrical wiring and lights unless otherwise noted.

5 TERMS & CONDITIONS (Continued)

10. Shade Shelters (DSA)
**8-10 Week lead time is AFTER DSA approval by your architect of choice * Customer to receive shade shelter.  If receiving by us is needed, please call for pricing and details! * Job to be completed in one mobilization. Additional moves will be additional pricing if we are required to remobilize due to schedule issues, stop work or a delay in work not caused by us.
*Pricing does NOT include, architectural drawings, site/plot plans, DSA submittal fees, job site inspector fees, shop welding inspection fees, and/or permits *DSA inplant Welding Inspector to be hired by the School District. Welding Inspector fee has NOT been quoted. *School District / Architect responsible for submission of plans to DSA for DSA approval *Fabrication cannot start until inspections have been coordinated, colors have been selected, and approved plans received. *Pricing does NOT include footings, steel cages, anchor bolts, or erecting of shade shelter unless otherwise noted.

11. Prevailing Wages
*Prevailing Wages NOT included unless otherwise noted. (ie: Davis Bacon, TERO, ect.) If this is a Prevailing Wage project, please request alternate pricing. *If Prevailing Wages / Davis Bacon Wages were INCLUDED, all other special work fees NOT included Additional Labor Charges may apply if alternate labor is required.
*If DIR Project Registration is required, work may not begin until we receive DIR Project ID number. *Park Planet does not meet the Skilled & Trained Workforce Requirements and will not participate in same. Park Planet will not sign any PLA's for Union Work and is not signatory to any unions.

12. Indemnity Provision
*Notwithstanding anything to the contrary in any Contract Documents we shall have no duty to defend or indemnify Owner, Customer, or any other party we agree to defend or indemnify in any Contract Documents for that portion of any claim arising out of the comparative fault of any party we agree to defend or indemnify in any Contract Documents.

13. Park Planet General Insurance
Call for Proof of Insurance & W-9
1 Quote #: Q22-1197
Date: January 20, 2022
Project: Fredrick Douglas Park
City: Merced
Sales Rep - Email: Kasanna Coulter -
[email protected]
Terms: Net 10dys / Install
Park Planet
a Division of Park Associates Inc
415 Elm Street
Red Bluff California 96080
(530) 244-6116
Quoted To:

City of Merced
678 West 18th Street
Merced, CA 95340
Contact: Ken Elwin
Phone: (209) 385-6800 / Email: [email protected] # Description Vendor Item No Qty Rate Amount

PLAYGROUND EQUIPMENT
1 Custom Round 5 Steel Play System..SN: R50B4F97B PlayCraft PR-R5 1 37,248.00 37,248.00 2 5-12 Age Appropriate Sign (HDPE) PlayCraft A2-1303 1 917.00 917.00 3 Material Surcharge:

To offset the increasing cost of materials. It is a separate line item so that it can be removed later when/if material prices go back to normal.

PlayCraft Surcharge 1 6,858.00 6,858.00

ITEMS NOT SPECIFICALLY PRICED
4 Wood Fiber - Chinese Camp Park Planet Wood Fiber 80 17.00 1,360.00

DISCOUNT
5 CMAS Discount
Vendor ID: 4-16-78-0038E-Sup 2:

CMAS Discount-

CMAS-TX
1 -4,842.00 -4,842.00

FREIGHT
6 PlayCraft Freight
**PlayCraft shipping pallet dimensions can reach upwards of 4'W x 8'H x 18'L and will be delivered on a 53' dry-van WITHOUT a liftgate. Offloading is the CUSTOMER'S
responsibility and is NOT included in shipping costs. (2) Forklifts or (1) Forklift with extended forks and a capacity of greater than 5,000lbs will be required to offload the pallet(s).

Please discuss offloading options with an Park Planet
representative PRIOR to placing an order.

PlayCraft PCF 1 2,600.00 2,600.00
7 Bettendorf Freight Bettendorf
Enterprises
BDF 1 650.00 650.00

IMPORTANT INFO
8 LEAD TIMES: Equipment on this quote has a current lead time of 18-20 weeks. Please discuss the timeline of your project and possible storage needs with your Park Planet rep before ordering.

Installation by Park Associates Inc. CA - Lic# 959805 DIR# PW-LR-1000423561 Prevailing Wage 9 Installation assumes normal digging conditions with standard bobcat & auger. Bobcat & concrete truck access required. 10 IF APPLICABLE:

1. Park Planet installers are not signatory to any unions and will not sign any PLA for the installation of the playground or special playground surfacing. The following supply and/or installation estimates do not include signing a PLA or paying any union labor or fees. All of the labor quoted herein will need to be excluded from a PLA agreement and union labor

QUOTEQUOTE
2 # Description Vendor Item No Qty Rate Amount
requirement waived by the purchasing agency, owner or
District.

2. Skilled & Trained Workforce – If this project is a Lease Lease-Back, or Design-Build Project, or a contract that triggers the Skilled and Trained Workforce requirements for a Public Works project, please contact Park Planet
immediately. The Following estimate for equipment and/or labor does NOT include such compliance. Park Planet and their subcontractors will NOT comply with Skilled and Trained Workforce labor and reporting. Park Planet’s portion of work (and our subcontractor’s work) will need to fall within an exception or waiver to the Skilled and Trained Workforce requirements or our estimate will not be valid.

REMOVAL OF EXISTING EQUIPMENT
11 Removal and disposal of existing equipment Park
Associates
Inc.

INST-CA 1 4,267.00 4,267.00

SITE PREPARATION
12 Removal and disposal of existing surfacing Park
Associates
Inc.

INST-CA 1 5,600.00 5,600.00
13 Installation of temp fencing around work area while project is under construction
Park
Associates
Inc.

INST-CA 1 2,100.00 2,100.00

INSTALLATION OF NEW PLAYGROUND EQUIPMENT
14 Installation of new play equipment Park
Associates
Inc.

INST-CA 1 20,124.00 20,124.00
15 Installation of new wood fiber surfacing Park
Associates
Inc.

INST-CA 1 3,995.00 3,995.00
16 Third-Party CPS Inspection Park
Associates
Inc.

Safe-2-Play 1 765.00 765.00
17 Payment & Performance Bond - *Subject to surety approval Park Planet BOND 1 2,041.05 2,041.05 18 Exclusions:

Site preparation not specifically stated.

Site is assumed flat and suitable for construction.

Drainage Consideration
Inspections or applicable permits and fees
Removal of obstacles to reach construction site.

Site security
*
Additional fees may apply if Bonding or Special Insurance required*
**Location and Marking of utility, plumbing and irrigation lines is the responsibility of the customer. Park Planet is not responsible for repairing unmarked underground utilities and pipes. **
By signing below, you acknowledge and agree to our
Contract; Exclusions, Conditions & Payment Terms, which are to be included in, and supersede any additional contracts or sub-contract agreements made separately based on this "Estimate". Unless otherwise specified above we Exclude Responsibility for: material delivery &/or offloading
equipment, storing of equipment, removal of packaging
accumulated by equipment supplied by others, project
security, landscape & hardscape repair based on access
route to site, delays or returns due to layout conflicts, locating underground utilities; utilities, pipes, obstructions in work area, conditions unforeseen and/or not disclosed at time of estimate, permits, engineering, material testing, soil samples.

Conditions: Grades; stable, compacted, & workable (rough grade to be taken + or - one tenth of one inch), adequate access to work site provided for workmen, materials, tools & equipment. Quote assumes all labor to be completed without interruption.
3 Sub Total 83,683.05
CA-Merced-Merced (8.25%) 3,427.13
Total $87,110.18
QUOTE GOOD FOR 30 DAYS - DUE TO THE CURRENT INDUSTRY WIDE VOLATILITY OF STEEL, AFTER 30 DAYS STEEL PRICES MAY ADJUST.

CURRENTLY EXPERIENCING SIGNIFICANTLY EXTENDED LEAD TIMES DUE TO NATIONWIDE TRANSPORTATION DELAYS - LEAD TIMES MAY EXCEED 14 WEEKS, PLEASE DISCUSS WITH A PARK PLANET REPRESENTATIVE.

ORDER / DELIVERY INFORMATION:

A PURCHASE ORDER OR SIGNED CHANGE ORDER MUST BE RECEIVED BEFORE ADDITIONAL EQUIPMENT, INSTALLATION, OR SERVICES CAN PROCEED. IF PAYING BY CREDIT CARD, A SURCHARGE WILL BE ASSESSED ON PAYMENT AMOUNT FOR 3.5% VISA/MC OR 5% AMEX.

Authorized Signature: ___________________________________________________________ Date:_____________________ **Purchasing agent who is authorized to enter into binding agreement for quoted entity. **By signing this quote, I have read and agree to the quote Terms & Conditions listed below, on the following 2 pages. 4 TERMS & CONDITIONS

1. General Notes
*Assembly and Installation NOT included unless otherwise noted *Payment and Performance bonds are NOT included unless otherwise stated. If required, additional charges will apply. Please call for details! *Customer responsible for quoted quantities and model numbers, please check! *Price reflects quoted quantity. Please request revision if alternate quantity is desired.

2. Payment / Ordering
*Most repeat customers are given the terms of 50% Deposit with order; Remainder within 30 Days from Delivery. *Others require a onepage credit application or payment with order *TO ORDER, please sign quote and return via email or fax to avoid any shipping delays.  Fax or email copy deemed to be legal equivalent of original.  If Payment with Order is required, please sign quote below and return with payment.  All past due accounts subject to 1 ½% monthly finance charge.  In the event legal action is required to effect collection venue shall be Red Bluff, CA.

3. Shipping / Unloading
*Shipped by Common Carrier – Customer will need 2 to 4 people to unload.  Liftgate NOT included.  Items will be boxed and / or stretch wrapped to pallets and customer is responsible for offloading.  Delivery Drivers do NOT unload **IMPORTANT:  Customer is responsible for receiving and checking quantities and condition at time of delivery Please note any shortages or damages on delivery copy.
*Notwithstanding anything to the contrary in any Contract Documents, Customer understands that estimated shipment times for materials are an estimate only.

We have no control over shipment dates. We thus make no guarantee to Owner or Customer regarding the projected shipment dates for materials and shall not be liable for any loss caused by the timing of shipments.

4. Engineered Wood Fiber
*Customer to provide access for Engineered Wood Fiber delivery with tractor truck and 53’ trailer. *Compaction of the Engineered Wood Fiber is NOT included in the installation cost, if desired, please request an updated proposal.

5. General Notes for Purchased Installation
*Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders, prep work, flat work, grading, rerouting of water, electric, drainage or sprinkler lines unless otherwise noted in the proposal *Demo of existing equipment or safety surfacing is NOT included unless otherwise stated in the proposal *ROCK CLAUSE: Pricing is based on normal soil conditions which would allow an auger on a tractor to dig footings. If rocks/boulders interfere with the progress of the excavation, additional fees may apply.
*ACCESS CLAUSE: Installation based on clear access to area. Crane service is NOT included.  Customer to provide access for bobcat to work area, bobcat will be provided by installer. Minimum access shall be 7’ wide and 7’ high.  If adequate access is not provided additional charges may apply and repairs to landscape and irrigation may be required. Customer is responsible for any repairs to landscape if proper access is not provided. *UTILITY CLAUSE: Unless stated in writing in the quote proposal, installation does not include marking of utilities by Dig Alert or other similar entities.

Customer can, however, call Dig Alert directly. Dig Alert CANNOT locate any private lines, PVC or plastic water lines.  Installation does NOT include repair or relocating any underground utilities, such as drainage, irrigation, live water lines, main low voltage lines, gas, electrical, communication, or sewer etc.

Customers responsibility to provide locations of any utilities prior to commencement of work. *Customer is responsible for all landscape repairs such as, but not limited to damaged trees, bushes, lawn, curbing, sidewalks and/or asphalt paving caused by materials truck and/or 2ton bobcat needed to complete project. *Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders unless otherwise noted *Before we proceed with the playground installation, the playground area MUST be compacted, be free of debris, and excavated accordingly.  Please call for details.
*Concrete pad for surface mount items NOT included and MUST be provided by customer unless otherwise stated. *Surface mount anchoring to asphalt and paver areas is NOT included unless otherwise stated. *Private Utility Locator is NOT included unless otherwise noted.  Private Utility Locator CANNOT locate any PVC or plastic water lines *Installation does NOT include saw cutting and/or core drilling unless otherwise noted *Installation does NOT include jackhammering.  Please call for details. *Area MUST have normal soil conditions and be level.
*All Athletic Equipment Goals such as soccer, football, etc, install location MUST be marked out by customer prior to installation, if installation was purchased.

6. Temporary Fencing
*Security guards and/or temporary fencing to prevent injuries, vandalism and/or accidental damage to install area or to the rubberized surface while it sets is NOT included unless noted on quote.  If desired, the installers can put up caution tape, but Temporary Fencing is recommended.  Although the fencing, if provided, is intended to provide this security, the overall security of the property is ultimately the responsibility of customer.  We are not responsible for any vandalism or injuries even with the provision of the fencing.

7. ADA Access
*Play Equipment MUST be installed over an impactabsorbing surface such as ADA compliant Engineered Wood Fiber or Rubber Surfacing. If not quoted, please call for details.
*This area is NOT ADA compliant without the installation of compliant surfacing and an accessible route up to and into the playground area. Please call for details.

8. PouredinPlace Rubber Surfacing
*Rubber Surfacing cure time is normally 4872 hours and can vary depending on weather conditions. *Rubber Surfacing cannot be installed during extreme weather conditions and may also not be installed if rain or frost is forecast during the cure time. *48Hour Manned Security is NOT included for rubber.

9. Shade Shelters (non DSA)
*Shade Shelter installation price EXCLUDES – unless otherwise stated in this quote engineering, drawings, calculations, permits, permit submittal, site plans, special inspections, soil reports, impact fees, special assessment fees. Customer is responsible for any and all of these items if required by the City/County. *Shade Shelter manufacture time is 8 weeks. Permitting can add 24 weeks or more to lead time. PLEASE NOTE: Shade Orders are NOT released into production until permit is issued!
*Shade Shelter installation price EXCLUDES concrete pad, footings, masonry columns, electrical wiring and lights unless otherwise noted.

5 TERMS & CONDITIONS (Continued)

10. Shade Shelters (DSA)
**8-10 Week lead time is AFTER DSA approval by your architect of choice * Customer to receive shade shelter.  If receiving by us is needed, please call for pricing and details! * Job to be completed in one mobilization. Additional moves will be additional pricing if we are required to remobilize due to schedule issues, stop work or a delay in work not caused by us.
*Pricing does NOT include, architectural drawings, site/plot plans, DSA submittal fees, job site inspector fees, shop welding inspection fees, and/or permits *DSA inplant Welding Inspector to be hired by the School District. Welding Inspector fee has NOT been quoted. *School District / Architect responsible for submission of plans to DSA for DSA approval *Fabrication cannot start until inspections have been coordinated, colors have been selected, and approved plans received. *Pricing does NOT include footings, steel cages, anchor bolts, or erecting of shade shelter unless otherwise noted.

11. Prevailing Wages
*Prevailing Wages NOT included unless otherwise noted. (ie: Davis Bacon, TERO, ect.) If this is a Prevailing Wage project, please request alternate pricing. *If Prevailing Wages / Davis Bacon Wages were INCLUDED, all other special work fees NOT included Additional Labor Charges may apply if alternate labor is required.
*If DIR Project Registration is required, work may not begin until we receive DIR Project ID number. *Park Planet does not meet the Skilled & Trained Workforce Requirements and will not participate in same. Park Planet will not sign any PLA's for Union Work and is not signatory to any unions.

12. Indemnity Provision
*Notwithstanding anything to the contrary in any Contract Documents we shall have no duty to defend or indemnify Owner, Customer, or any other party we agree to defend or indemnify in any Contract Documents for that portion of any claim arising out of the comparative fault of any party we agree to defend or indemnify in any Contract Documents.

13. Park Planet General Insurance
Call for Proof of Insurance & W-9
1 Quote #: Q22-1198
Date: January 20, 2022
Project: Hansen Park
City: Merced
Sales Rep - Email: Kasanna Coulter -
[email protected]
Terms: Net 10dys / Install
Park Planet
a Division of Park Associates Inc
415 Elm Street
Red Bluff California 96080
(530) 244-6116
Quoted To:

City of Merced
678 West 18th Street
Merced, CA 95340
Contact: Ken Elwin
Phone: (209) 385-6800 / Email: [email protected] # Description Vendor Item No Qty Rate Amount

PLAYGROUND EQUIPMENT
1 Custom Round 5 Steel Play System..SN: R508B6C3B PlayCraft PR-R5 1 27,184.00 27,184.00 2 5-12 Age Appropriate Sign (HDPE) PlayCraft A2-1303 1 917.00 917.00 3 Material Surcharge:

To offset the increasing cost of materials. It is a separate line item so that it can be removed later when/if material prices go back to normal.

PlayCraft Surcharge 1 4,852.00 4,852.00

ITEMS NOT SPECIFICALLY PRICED
4 Wood Fiber - Chinese Camp Park Plane Wood Fiber 52 17.00 884.00

DISCOUNT
5 CMAS Discount
Vendor ID: 4-16-78-0038E-Sup 2:

CMAS Discount-

CMAS-TX
1 -3,295.30 -3,295.30

FREIGHT
6 PlayCraft Freight
**PlayCraft shipping pallet dimensions can reach upwards of 4'W x 8'H x 18'L and will be delivered on a 53' dry-van WITHOUT a liftgate. Offloading is the CUSTOMER'S
responsibility and is NOT included in shipping costs. (2) Forklifts or (1) Forklift with extended forks and a capacity of greater than 5,000lbs will be required to offload the pallet(s).

Please discuss offloading options with an Park Planet
representative PRIOR to placing an order.

PlayCraft PCF 1 2,200.00 2,200.00
7 Bettendorf Freight Bettendorf
Enterprises
BDF 1 650.00 650.00

IMPORTANT INFO
8 LEAD TIMES: Equipment on this quote has a current lead time of 18-20 weeks. Please discuss the timeline of your project and possible storage needs with your Park Planet rep before ordering.

Installation by Park Associates Inc. CA - Lic# 959805 DIR# PW-LR-1000423561 Prevailing Wage 9 Installation assumes normal digging conditions with standard bobcat & auger. Bobcat & concrete truck access required. 10 IF APPLICABLE:

1. Park Planet installers are not signatory to any unions and will not sign any PLA for the installation of the playground or special playground surfacing. The following supply and/or installation estimates do not include signing a PLA or paying any union labor or fees. All of the labor quoted herein will need to be excluded from a PLA agreement and union labor

QUOTEQUOTE
2 # Description Vendor Item No Qty Rate Amount
requirement waived by the purchasing agency, owner or
District.

2. Skilled & Trained Workforce – If this project is a Lease Lease-Back, or Design-Build Project, or a contract that triggers the Skilled and Trained Workforce requirements for a Public Works project, please contact Park Planet
immediately. The Following estimate for equipment and/or labor does NOT include such compliance. Park Planet and their subcontractors will NOT comply with Skilled and Trained Workforce labor and reporting. Park Planet’s portion of work (and our subcontractor’s work) will need to fall within an exception or waiver to the Skilled and Trained Workforce requirements or our estimate will not be valid.

REMOVAL OF EXISTING EQUIPMENT
11 Removal and disposal of existing equipment Park
Associates
Inc.

INST-CA 1 4,000.00 4,000.00

SITE PREPARATION
12 Removal and disposal of existing surfacing Park
Associates
Inc.

INST-CA 1 4,667.00 4,667.00
13 Installation of temp fencing around work area while project is under construction
Park
Associates
Inc.

INST-CA 1 2,333.00 2,333.00

INSTALLATION OF NEW PLAYGROUND EQUIPMENT
14 Installation of new play equipment Park
Associates
Inc.

INST-CA 1 14,237.00 14,237.00
15 Installation of new wood fiber surfacing Park
Associates
Inc.

INST-CA 1 2,667.00 2,667.00
16 Third-Party CPS Inspection Park
Associates
Inc.

Safe-2-Play 1 765.00 765.00
17 Payment & Performance Bond - *Subject to surety approval Park Planet BOND 1 1,551.52 1,551.52 18 Exclusions:

Site preparation not specifically stated.

Site is assumed flat and suitable for construction.

Drainage Consideration
Inspections or applicable permits and fees
Removal of obstacles to reach construction site.

Site security
*
Additional fees may apply if Bonding or Special Insurance required*
**Location and Marking of utility, plumbing and irrigation lines is the responsibility of the customer. Park Planet is not responsible for repairing unmarked underground utilities and pipes. **
By signing below, you acknowledge and agree to our
Contract; Exclusions, Conditions & Payment Terms, which are to be included in, and supersede any additional contracts or sub-contract agreements made separately based on this "Estimate". Unless otherwise specified above we Exclude Responsibility for: material delivery &/or offloading
equipment, storing of equipment, removal of packaging
accumulated by equipment supplied by others, project
security, landscape & hardscape repair based on access
route to site, delays or returns due to layout conflicts, locating underground utilities; utilities, pipes, obstructions in work area, conditions unforeseen and/or not disclosed at time of estimate, permits, engineering, material testing, soil samples.

Conditions: Grades; stable, compacted, & workable (rough grade to be taken + or - one tenth of one inch), adequate access to work site provided for workmen, materials, tools & equipment. Quote assumes all labor to be completed without interruption.
3 Sub Total 63,612.22
CA-Merced-Merced (8.25%) 2,519.69
Total $66,131.91
QUOTE GOOD FOR 30 DAYS - DUE TO THE CURRENT INDUSTRY WIDE VOLATILITY OF STEEL, AFTER 30 DAYS STEEL PRICES MAY ADJUST.

CURRENTLY EXPERIENCING SIGNIFICANTLY EXTENDED LEAD TIMES DUE TO NATIONWIDE TRANSPORTATION DELAYS - LEAD TIMES MAY EXCEED 14 WEEKS, PLEASE DISCUSS WITH A PARK PLANET REPRESENTATIVE.

ORDER / DELIVERY INFORMATION:

A PURCHASE ORDER OR SIGNED CHANGE ORDER MUST BE RECEIVED BEFORE ADDITIONAL EQUIPMENT, INSTALLATION, OR SERVICES CAN PROCEED. IF PAYING BY CREDIT CARD, A SURCHARGE WILL BE ASSESSED ON PAYMENT AMOUNT FOR 3.5% VISA/MC OR 5% AMEX.

Authorized Signature: ___________________________________________________________ Date:_____________________ **Purchasing agent who is authorized to enter into binding agreement for quoted entity. **By signing this quote, I have read and agree to the quote Terms & Conditions listed below, on the following 2 pages. 4 TERMS & CONDITIONS

1. General Notes
*Assembly and Installation NOT included unless otherwise noted *Payment and Performance bonds are NOT included unless otherwise stated. If required, additional charges will apply. Please call for details! *Customer responsible for quoted quantities and model numbers, please check! *Price reflects quoted quantity. Please request revision if alternate quantity is desired.

2. Payment / Ordering
*Most repeat customers are given the terms of 50% Deposit with order; Remainder within 30 Days from Delivery. *Others require a onepage credit application or payment with order *TO ORDER, please sign quote and return via email or fax to avoid any shipping delays.  Fax or email copy deemed to be legal equivalent of original.  If Payment with Order is required, please sign quote below and return with payment.  All past due accounts subject to 1 ½% monthly finance charge.  In the event legal action is required to effect collection venue shall be Red Bluff, CA.

3. Shipping / Unloading
*Shipped by Common Carrier – Customer will need 2 to 4 people to unload.  Liftgate NOT included.  Items will be boxed and / or stretch wrapped to pallets and customer is responsible for offloading.  Delivery Drivers do NOT unload **IMPORTANT:  Customer is responsible for receiving and checking quantities and condition at time of delivery Please note any shortages or damages on delivery copy.
*Notwithstanding anything to the contrary in any Contract Documents, Customer understands that estimated shipment times for materials are an estimate only.

We have no control over shipment dates. We thus make no guarantee to Owner or Customer regarding the projected shipment dates for materials and shall not be liable for any loss caused by the timing of shipments.

4. Engineered Wood Fiber
*Customer to provide access for Engineered Wood Fiber delivery with tractor truck and 53’ trailer. *Compaction of the Engineered Wood Fiber is NOT included in the installation cost, if desired, please request an updated proposal.

5. General Notes for Purchased Installation
*Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders, prep work, flat work, grading, rerouting of water, electric, drainage or sprinkler lines unless otherwise noted in the proposal *Demo of existing equipment or safety surfacing is NOT included unless otherwise stated in the proposal *ROCK CLAUSE: Pricing is based on normal soil conditions which would allow an auger on a tractor to dig footings. If rocks/boulders interfere with the progress of the excavation, additional fees may apply.
*ACCESS CLAUSE: Installation based on clear access to area. Crane service is NOT included.  Customer to provide access for bobcat to work area, bobcat will be provided by installer. Minimum access shall be 7’ wide and 7’ high.  If adequate access is not provided additional charges may apply and repairs to landscape and irrigation may be required. Customer is responsible for any repairs to landscape if proper access is not provided. *UTILITY CLAUSE: Unless stated in writing in the quote proposal, installation does not include marking of utilities by Dig Alert or other similar entities.

Customer can, however, call Dig Alert directly. Dig Alert CANNOT locate any private lines, PVC or plastic water lines.  Installation does NOT include repair or relocating any underground utilities, such as drainage, irrigation, live water lines, main low voltage lines, gas, electrical, communication, or sewer etc.

Customers responsibility to provide locations of any utilities prior to commencement of work. *Customer is responsible for all landscape repairs such as, but not limited to damaged trees, bushes, lawn, curbing, sidewalks and/or asphalt paving caused by materials truck and/or 2ton bobcat needed to complete project. *Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders unless otherwise noted *Before we proceed with the playground installation, the playground area MUST be compacted, be free of debris, and excavated accordingly.  Please call for details.
*Concrete pad for surface mount items NOT included and MUST be provided by customer unless otherwise stated. *Surface mount anchoring to asphalt and paver areas is NOT included unless otherwise stated. *Private Utility Locator is NOT included unless otherwise noted.  Private Utility Locator CANNOT locate any PVC or plastic water lines *Installation does NOT include saw cutting and/or core drilling unless otherwise noted *Installation does NOT include jackhammering.  Please call for details. *Area MUST have normal soil conditions and be level.
*All Athletic Equipment Goals such as soccer, football, etc, install location MUST be marked out by customer prior to installation, if installation was purchased.

6. Temporary Fencing
*Security guards and/or temporary fencing to prevent injuries, vandalism and/or accidental damage to install area or to the rubberized surface while it sets is NOT included unless noted on quote.  If desired, the installers can put up caution tape, but Temporary Fencing is recommended.  Although the fencing, if provided, is intended to provide this security, the overall security of the property is ultimately the responsibility of customer.  We are not responsible for any vandalism or injuries even with the provision of the fencing.

7. ADA Access
*Play Equipment MUST be installed over an impactabsorbing surface such as ADA compliant Engineered Wood Fiber or Rubber Surfacing. If not quoted, please call for details.
*This area is NOT ADA compliant without the installation of compliant surfacing and an accessible route up to and into the playground area. Please call for details.

8. PouredinPlace Rubber Surfacing
*Rubber Surfacing cure time is normally 4872 hours and can vary depending on weather conditions. *Rubber Surfacing cannot be installed during extreme weather conditions and may also not be installed if rain or frost is forecast during the cure time. *48Hour Manned Security is NOT included for rubber.

9. Shade Shelters (non DSA)
*Shade Shelter installation price EXCLUDES – unless otherwise stated in this quote engineering, drawings, calculations, permits, permit submittal, site plans, special inspections, soil reports, impact fees, special assessment fees. Customer is responsible for any and all of these items if required by the City/County. *Shade Shelter manufacture time is 8 weeks. Permitting can add 24 weeks or more to lead time. PLEASE NOTE: Shade Orders are NOT released into production until permit is issued!
*Shade Shelter installation price EXCLUDES concrete pad, footings, masonry columns, electrical wiring and lights unless otherwise noted.

5 TERMS & CONDITIONS (Continued)

10. Shade Shelters (DSA)
**8-10 Week lead time is AFTER DSA approval by your architect of choice * Customer to receive shade shelter.  If receiving by us is needed, please call for pricing and details! * Job to be completed in one mobilization. Additional moves will be additional pricing if we are required to remobilize due to schedule issues, stop work or a delay in work not caused by us.
*Pricing does NOT include, architectural drawings, site/plot plans, DSA submittal fees, job site inspector fees, shop welding inspection fees, and/or permits *DSA inplant Welding Inspector to be hired by the School District. Welding Inspector fee has NOT been quoted. *School District / Architect responsible for submission of plans to DSA for DSA approval *Fabrication cannot start until inspections have been coordinated, colors have been selected, and approved plans received. *Pricing does NOT include footings, steel cages, anchor bolts, or erecting of shade shelter unless otherwise noted.

11. Prevailing Wages
*Prevailing Wages NOT included unless otherwise noted. (ie: Davis Bacon, TERO, ect.) If this is a Prevailing Wage project, please request alternate pricing. *If Prevailing Wages / Davis Bacon Wages were INCLUDED, all other special work fees NOT included Additional Labor Charges may apply if alternate labor is required.
*If DIR Project Registration is required, work may not begin until we receive DIR Project ID number. *Park Planet does not meet the Skilled & Trained Workforce Requirements and will not participate in same. Park Planet will not sign any PLA's for Union Work and is not signatory to any unions.

12. Indemnity Provision
*Notwithstanding anything to the contrary in any Contract Documents we shall have no duty to defend or indemnify Owner, Customer, or any other party we agree to defend or indemnify in any Contract Documents for that portion of any claim arising out of the comparative fault of any party we agree to defend or indemnify in any Contract Documents.

13. Park Planet General Insurance
Call for Proof of Insurance & W-9
1 Quote #: Q22-1200
Date: January 20, 2022
Project:

City:

Sales Rep - Email:

Terms:

Santa Fe Strip Park
Merced
Kasanna Coulter -
[email protected]
Net 10dys / Install
Park Planet
a Division of Park Associates Inc
415 Elm Street
Red Bluff California 96080
(530) 244-6116
Quoted To:

City of Merced
678 West 18th Street
Merced, CA 95340
Contact: Ken Elwin
Phone: (209) 385-6800 / Email: [email protected] # Description Vendor Item No Qty Rate Amount

PLAYGROUND EQUIPMENT
1 Custom Round 5 Steel Play System..SN: R50C533DB PlayCraft PR-R5 1 40,001.00 40,001.00 2 5-12 Age Appropriate Sign (HDPE) PlayCraft A2-1303 1 917.00 917.00 3 Material Surcharge:

To offset the increasing cost of materials. It is a separate line item so that it can be removed later when/if material prices go back to normal.

PlayCraft Surcharge 1 7,065.00 7,065.00

ITEMS NOT SPECIFICALLY PRICED
4 Wood Fiber - Chinese Camp Park Planet Wood Fiber 60 17.00 1,020.00

DISCOUNT
5 CMAS Discount
Vendor ID: 4-16-78-0038E-Sup 2:

CMAS Discount-

CMAS-TX
1 -4,798.30 -4,798.30

FREIGHT
6 PlayCraft Freight
**PlayCraft shipping pallet dimensions can reach upwards of 4'W x 8'H x 18'L and will be delivered on a 53' dry-van WITHOUT a liftgate. Offloading is the CUSTOMER'S
responsibility and is NOT included in shipping costs. (2) Forklifts or (1) Forklift with extended forks and a capacity of greater than 5,000lbs will be required to offload the pallet(s).

Please discuss offloading options with an Park Planet
representative PRIOR to placing an order.

PlayCraft PCF 1 2,600.00 2,600.00
7 Bettendorf Freight Bettendorf
Enterprises
BDF 1 650.00 650.00

IMPORTANT INFO
8 LEAD TIMES: Equipment on this quote has a current lead time of 18-20 weeks. Please discuss the timeline of your project and possible storage needs with your Park Planet rep before ordering.

Installation by Park Associates Inc. CA - Lic# 959805 DIR# PW-LR-1000423561 Prevailing Wage 9 Installation assumes normal digging conditions with standard bobcat & auger. Bobcat & concrete truck access required. 10 IF APPLICABLE:

1. Park Planet installers are not signatory to any unions and will not sign any PLA for the installation of the playground or special playground surfacing. The following supply and/or installation estimates do not include signing a PLA or paying any union labor or fees. All of the labor quoted herein will need to be excluded from a PLA agreement and union labor

QUOTEQUOTE
2 # Description Vendor Item No Qty Rate Amount
requirement waived by the purchasing agency, owner or
District.

2. Skilled & Trained Workforce – If this project is a Lease Lease-Back, or Design-Build Project, or a contract that triggers the Skilled and Trained Workforce requirements for a Public Works project, please contact Park Planet
immediately. The Following estimate for equipment and/or labor does NOT include such compliance. Park Planet and their subcontractors will NOT comply with Skilled and Trained Workforce labor and reporting. Park Planet’s portion of work (and our subcontractor’s work) will need to fall within an exception or waiver to the Skilled and Trained Workforce requirements or our estimate will not be valid.

REMOVAL OF EXISTING EQUIPMENT
11 Removal and disposal of existing equipment Park
Associates
Inc.

INST-CA 1 4,919.00 4,919.00

SITE PREPARATION
12 Removal and disposal of existing surfacing Park
Associates
Inc.

INST-CA 1 6,265.00 6,265.00
13 Installation of temp fencing around work area while project is under construction
Park
Associates
Inc.

INST-CA 1 2,432.00 2,432.00

INSTALLATION OF NEW PLAYGROUND EQUIPMENT
14 Installation of new play equipment Park
Associates
Inc.

INST-CA 1 21,011.00 21,011.00
15 Installation of new wood fiber surfacing Park
Associates
Inc.

INST-CA 1 4,054.00 4,054.00
16 Third-Party CPS Inspection Park
Associates
Inc.

Safe-2-Play 1 765.00 765.00
17 Payment & Performance Bond - *Subject to surety approval Park Planet BOND 1 2,172.52 2,172.52 18 Exclusions:

Storage of materials until installation
Site preparation not specifically stated.

Site is assumed flat and suitable for construction.

Drainage Consideration
Inspections or applicable permits and fees
Removal of obstacles to reach construction site.

Site security
*
Additional fees may apply if Bonding or Special Insurance required*
**Location and Marking of utility, plumbing and irrigation lines is the responsibility of the customer. Park Planet is not responsible for repairing unmarked underground utilities and pipes. **
By signing below, you acknowledge and agree to our
Contract; Exclusions, Conditions & Payment Terms, which are to be included in, and supersede any additional contracts or sub-contract agreements made separately based on this "Estimate". Unless otherwise specified above we Exclude Responsibility for: material delivery &/or offloading
equipment, storing of equipment, removal of packaging
accumulated by equipment supplied by others, project
security, landscape & hardscape repair based on access
route to site, delays or returns due to layout conflicts, locating underground utilities; utilities, pipes, obstructions in work area, conditions unforeseen and/or not disclosed at time of estimate, permits, engineering, material testing, soil samples.

Conditions: Grades; stable, compacted, & workable (rough grade to be taken + or - one tenth of one inch), adequate access to work site provided for workmen, materials, tools & equipment. Quote assumes all labor to be completed without interruption.
3 Sub Total 89,073.22
CA-Merced-Merced (8.25%) 3,646.89
Total $92,720.11
QUOTE GOOD FOR 30 DAYS - DUE TO THE CURRENT INDUSTRY WIDE VOLATILITY OF STEEL, AFTER 30 DAYS STEEL PRICES MAY ADJUST.

CURRENTLY EXPERIENCING SIGNIFICANTLY EXTENDED LEAD TIMES DUE TO NATIONWIDE TRANSPORTATION DELAYS - LEAD TIMES MAY EXCEED 14 WEEKS, PLEASE DISCUSS WITH A PARK PLANET REPRESENTATIVE.

ORDER / DELIVERY INFORMATION:

A PURCHASE ORDER OR SIGNED CHANGE ORDER MUST BE RECEIVED BEFORE ADDITIONAL EQUIPMENT, INSTALLATION, OR SERVICES CAN PROCEED. IF PAYING BY CREDIT CARD, A SURCHARGE WILL BE ASSESSED ON PAYMENT AMOUNT FOR 3.5% VISA/MC OR 5% AMEX.

Authorized Signature: ___________________________________________________________ Date:_____________________ **Purchasing agent who is authorized to enter into binding agreement for quoted entity. **By signing this quote, I have read and agree to the quote Terms & Conditions listed below, on the following 2 pages. 4 TERMS & CONDITIONS

1. General Notes
*Assembly and Installation NOT included unless otherwise noted *Payment and Performance bonds are NOT included unless otherwise stated. If required, additional charges will apply. Please call for details! *Customer responsible for quoted quantities and model numbers, please check! *Price reflects quoted quantity. Please request revision if alternate quantity is desired.

2. Payment / Ordering
*Most repeat customers are given the terms of 50% Deposit with order; Remainder within 30 Days from Delivery. *Others require a onepage credit application or payment with order *TO ORDER, please sign quote and return via email or fax to avoid any shipping delays.  Fax or email copy deemed to be legal equivalent of original.  If Payment with Order is required, please sign quote below and return with payment.  All past due accounts subject to 1 ½% monthly finance charge.  In the event legal action is required to effect collection venue shall be Red Bluff, CA.

3. Shipping / Unloading
*Shipped by Common Carrier – Customer will need 2 to 4 people to unload.  Liftgate NOT included.  Items will be boxed and / or stretch wrapped to pallets and customer is responsible for offloading.  Delivery Drivers do NOT unload **IMPORTANT:  Customer is responsible for receiving and checking quantities and condition at time of delivery Please note any shortages or damages on delivery copy.
*Notwithstanding anything to the contrary in any Contract Documents, Customer understands that estimated shipment times for materials are an estimate only.

We have no control over shipment dates. We thus make no guarantee to Owner or Customer regarding the projected shipment dates for materials and shall not be liable for any loss caused by the timing of shipments.

4. Engineered Wood Fiber
*Customer to provide access for Engineered Wood Fiber delivery with tractor truck and 53’ trailer. *Compaction of the Engineered Wood Fiber is NOT included in the installation cost, if desired, please request an updated proposal.

5. General Notes for Purchased Installation
*Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders, prep work, flat work, grading, rerouting of water, electric, drainage or sprinkler lines unless otherwise noted in the proposal *Demo of existing equipment or safety surfacing is NOT included unless otherwise stated in the proposal *ROCK CLAUSE: Pricing is based on normal soil conditions which would allow an auger on a tractor to dig footings. If rocks/boulders interfere with the progress of the excavation, additional fees may apply.
*ACCESS CLAUSE: Installation based on clear access to area. Crane service is NOT included.  Customer to provide access for bobcat to work area, bobcat will be provided by installer. Minimum access shall be 7’ wide and 7’ high.  If adequate access is not provided additional charges may apply and repairs to landscape and irrigation may be required. Customer is responsible for any repairs to landscape if proper access is not provided. *UTILITY CLAUSE: Unless stated in writing in the quote proposal, installation does not include marking of utilities by Dig Alert or other similar entities.

Customer can, however, call Dig Alert directly. Dig Alert CANNOT locate any private lines, PVC or plastic water lines.  Installation does NOT include repair or relocating any underground utilities, such as drainage, irrigation, live water lines, main low voltage lines, gas, electrical, communication, or sewer etc.

Customers responsibility to provide locations of any utilities prior to commencement of work. *Customer is responsible for all landscape repairs such as, but not limited to damaged trees, bushes, lawn, curbing, sidewalks and/or asphalt paving caused by materials truck and/or 2ton bobcat needed to complete project. *Installation does NOT include ground preparation, excavation, safety surfacing, and/or safety surfacing borders unless otherwise noted *Before we proceed with the playground installation, the playground area MUST be compacted, be free of debris, and excavated accordingly.  Please call for details.
*Concrete pad for surface mount items NOT included and MUST be provided by customer unless otherwise stated. *Surface mount anchoring to asphalt and paver areas is NOT included unless otherwise stated. *Private Utility Locator is NOT included unless otherwise noted.  Private Utility Locator CANNOT locate any PVC or plastic water lines *Installation does NOT include saw cutting and/or core drilling unless otherwise noted *Installation does NOT include jackhammering.  Please call for details. *Area MUST have normal soil conditions and be level.
*All Athletic Equipment Goals such as soccer, football, etc, install location MUST be marked out by customer prior to installation, if installation was purchased.

6. Temporary Fencing
*Security guards and/or temporary fencing to prevent injuries, vandalism and/or accidental damage to install area or to the rubberized surface while it sets is NOT included unless noted on quote.  If desired, the installers can put up caution tape, but Temporary Fencing is recommended.  Although the fencing, if provided, is intended to provide this security, the overall security of the property is ultimately the responsibility of customer.  We are not responsible for any vandalism or injuries even with the provision of the fencing.

7. ADA Access
*Play Equipment MUST be installed over an impactabsorbing surface such as ADA compliant Engineered Wood Fiber or Rubber Surfacing. If not quoted, please call for details.
*This area is NOT ADA compliant without the installation of compliant surfacing and an accessible route up to and into the playground area. Please call for details.

8. PouredinPlace Rubber Surfacing
*Rubber Surfacing cure time is normally 4872 hours and can vary depending on weather conditions. *Rubber Surfacing cannot be installed during extreme weather conditions and may also not be installed if rain or frost is forecast during the cure time. *48Hour Manned Security is NOT included for rubber.

9. Shade Shelters (non DSA)
*Shade Shelter installation price EXCLUDES – unless otherwise stated in this quote engineering, drawings, calculations, permits, permit submittal, site plans, special inspections, soil reports, impact fees, special assessment fees. Customer is responsible for any and all of these items if required by the City/County. *Shade Shelter manufacture time is 8 weeks. Permitting can add 24 weeks or more to lead time. PLEASE NOTE: Shade Orders are NOT released into production until permit is issued!
*Shade Shelter installation price EXCLUDES concrete pad, footings, masonry columns, electrical wiring and lights unless otherwise noted.

5 TERMS & CONDITIONS (Continued)

10. Shade Shelters (DSA)
**8-10 Week lead time is AFTER DSA approval by your architect of choice * Customer to receive shade shelter.  If receiving by us is needed, please call for pricing and details! * Job to be completed in one mobilization. Additional moves will be additional pricing if we are required to remobilize due to schedule issues, stop work or a delay in work not caused by us.
*Pricing does NOT include, architectural drawings, site/plot plans, DSA submittal fees, job site inspector fees, shop welding inspection fees, and/or permits *DSA inplant Welding Inspector to be hired by the School District. Welding Inspector fee has NOT been quoted. *School District / Architect responsible for submission of plans to DSA for DSA approval *Fabrication cannot start until inspections have been coordinated, colors have been selected, and approved plans received. *Pricing does NOT include footings, steel cages, anchor bolts, or erecting of shade shelter unless otherwise noted.

11. Prevailing Wages
*Prevailing Wages NOT included unless otherwise noted. (ie: Davis Bacon, TERO, ect.) If this is a Prevailing Wage project, please request alternate pricing. *If Prevailing Wages / Davis Bacon Wages were INCLUDED, all other special work fees NOT included Additional Labor Charges may apply if alternate labor is required.
*If DIR Project Registration is required, work may not begin until we receive DIR Project ID number. *Park Planet does not meet the Skilled & Trained Workforce Requirements and will not participate in same. Park Planet will not sign any PLA's for Union Work and is not signatory to any unions.

12. Indemnity Provision
*Notwithstanding anything to the contrary in any Contract Documents we shall have no duty to defend or indemnify Owner, Customer, or any other party we agree to defend or indemnify in any Contract Documents for that portion of any claim arising out of the comparative fault of any party we agree to defend or indemnify in any Contract Documents.

13. Park Planet General Insurance
Call for Proof of Insurance & W-9

← All documents from this meeting