.July 23, 2015
Local Assistance Procedures Manual Exhibit 17-F
Final Report-Utilization of Disadvantaged Business Enterprises (DBE) and First-Tier Subcontractors
INSTRUCTIONS- FINAL REPORT-UTILIZATION OF DISADVANTAGED BUSINESS ENTERPRISES (DBE) AND FIRST-TIER SUBCONTR.<\.CTORS
1. Local Agency Contract Number - Enter the Local Agency contract number or identifier.
2. Federal-Aid Project Number - Enter the Federal-Aid Project Number.
3. Local Agency - Enter the name of the local or regional agency that is funding the contract.
4. Contract Completion Date - Enter the date the contract was completed.
5. Contractor/Consultant - Enter the contractor/consultant's firm name.
6. Business Address - Enter the contractor/consultant's business address.
7. Final Contract Amount - Enter the total final amount for the contract.
8. Contract Item Number - Enter contract item for work, services, or materials supplied provided. Not applicable for consultant contracts.
9. Description of Work, Services, or Materials Supplied - Enter description of work, services, or materials provided. Indicate all work to be performed by DBEs including work perfonned by the prime contractor/consultant's own forces, if the prime is a DBE. If 100% of the item is not to be performed or furnished by the DBE, describe the exact portion to be performed or furnished by the DBE. See LAPM Chapter 9 to determine how to count the participation of DBE firms.
10. Company Name and Business Address - Enter the name, address, and phone number of all subcontracted contractors/consultants. Also, enter the prime contractor/consultant's name and phone number, if the prime is a DBE.
11. DBE Certification Number - Enter the DBE's Certification Identification Number. Leave blank if subcontractor is not a DBE.
12. Contract Payments - Enter the subcontracted dollar amount of the work performed or service provided.
Include the prime contractor/consultant if the prime is a DBE. 111e Non-DBE column is used to enter the dollar value of work perfonned by firms that are not certified DBE or for work after a DBE becomes decertified.
13. Date Work Completed - Enter the date the subcontractor/subconsultant's item work was completed.
14. Date of Final Payment - Enter the date when the prime contractor/consultant made the final payment to the subcontractor/subconsultant for the portion of work listed as being completed.
15. Original DBE Commitment Amount - Enter the "Total Claimed DBE Participation Dollars" from Exhibits 15-G or 10-02 for the contract.
16. Total - Enter the sum of the "Contract Payments" Non-DBE and DBE columns.
17. Contractor/Consultant Representative's Signature - 111e person completing the fonn on behalf of the contractor/consultant's firm must sign their name.
18. Contractor/Consultant Representative's Name - Enter the name of the person preparing and signing the form.
19. Phone - Enter the area code and telephone number of the person signing the form.
20. Date - Enter the date the form is signed by the contractor's preparer.
21. Local Agency Representative's Signature - A Local Agency Representative must sign their name to certify that the contracting records and on-site performance of the DBE(s) has been monitored.
22. Local Agency Representative's Name - Enter the name of the Local Agency Representative signing the form.
23. Phone - Enter the area code and telephone number of the person signing the form.
24. Date - Enter the date the form is signed by the Local Agency Representative.
July 23, 2015
EXHIBIT "17-0"- DBE CERTIFICATION STATUS CHANGE
125
Local Assistance Procedures Manual Exhibit17-0
Disadvantaged Businm Enterprises (l!_BE) ~ertificatio_n Statu_s Change EXHIBIT 17-01)1sADVANTAGED BUSINESS ENTERPRISES (DBE) CERTIFICATION STATUS CHANGE
1. Local Agency Contract Number 12. Federal-Aid Project Number I 3. Local Agency , 4. Contract Completion Date
5. Contractor/Consultant 16. Business Address 17. Final Contract Amount
8. Contract 10. DBE 12. Certification/
Item 9. DBE Contact Information Certification 11. Amount Paid Decertification 13. Comments While Certified Date Number Number (Letter Attached) If there were no changes in the DBE certification of subcontraetorslsubconsunants. indcate on the form.
I CERTIFY THAT THE ABOVE INFORMATION IS COMPLETE AND CORRECT
14. Contractor/Consultant Representative's Signature 115. Contractor/Consultant Representative's Name 116. Phone 117. Date I CERTIFY THAT THE CONTRACTING RECORDS AND ON-!IITE PERFORMANCE OF THE OBE(S) HAS BEEN MONITORED
18. Local Agency Representative's Signature 119. Local Agency Representative's Name 120. Phone 121. Dale DISTRIBUTION: Original - Local Agency, Copy-Caltrans District Local Assistance Engineer. Include with Final Report or Expenditures ADA NOTICE: For individuals with sensory dsabiities, this document is available in alternate formats. For information, caH (918) 445-1233, Local Assistance Procedures Manual TTY 711, or write to Records and Forms Menagemen~ 1120 N Street, MS-89, Sacramento, CA 95814.
Pagel of2
July 23, 2015
Local Assistance Procedures Manual Exhibit 17-0
Disadvantaged Business Enterprises (DBE) Certification Status Change
INSTRUCTIONS -DISADVANTAGED BUSINESS ENTERPRISES (DBE)
CERTIFICATION STATUS CHANGE
1. Local Agency Contract Number - Enter the Local Agency contract number or identifier.
2. Federal-Aid Project Number - Enter the Federal-Aid Project Number.
3. Local Agency - Enter the name of the local or regional agency that is funding the contract.
4. Contract Completion Date - Enter the date the contract was completed.
5. Contractor/Consultant - Enter the contractor/consultant's finn name.
6. Business Address - Enter the contractor/consultant's business address.
7. Final Contract Amount - Enter the total final amount for the contract.
8. Contract Item Number - Enter contract item for work, services, or materials supplied provided. Not applicable for consultant contracts.
9. DBE Contact Information - Enter the name, address, and phone number of all DBE subcontracted contractors/consultants.
10. DBE Certification Number - Enter the DBE's Certification Identification Number.
11. Amount Paid While Certified - Enter the actual dollar value of the work performed by those subcontractors/subconsultants during the time period they are certified as a DBE.
12. Certification/Decertification Date (Letter Attached)- Enter either the date of the Decertification Letter sent out by the Office of Business and Economic Opportunity (OBEO) or the date of the Certification Certificate mailed out by OBEO.
13. Comments - If needed, provide any additional information in this section regarding any of the above certification status changes.
14. Contractor/Consultant Representative's Signature - The person completing the fo1m on behalf of the contractor/consultant's firm must sign their name.
15. Contractor/Consultant Representative's Name - Enter the name of the person preparing and signing the form.
16. Phone - Enter the area code and telephone number of the person signing the form.
17. Date - Enter the date the form is signed by the contractor's preparer.
18. Local Agency Representative's Signature - A Local Agency Representative must sign their name to certify
that the contracting records and on-site performance of the DBE(s) has been monitored.
19. Local Agency Representative's Name - Enter the name of the Local Agency Representative signing the form.
20. Phone - Enter the area code and telephone number of the person signing the fonn.
21. Date - Enter the date the form is signed by the Local Agency Representative.
July 23, 2015
-N
00 of Subcm:itraelorn
jExhibit 12-B Bidder's List of Subcontractor (DBE and Non-DBE) Part I .As ~@ l, 2015 Contractors (and sub-contractor3) wishing to bid on public works contracts shall be regi.-tered with the State Division of Industria! Relations and certified to bid on Public Works contracts. Please register at: https:/lwww.ctir.ca.gov/Pu!JHc-Works/ContracrorcRegimation.html In a~ with Title 49, Section 26.11 of the C:lde of Federal Regulaiiom, and Section 4 l 04 of the Public Contract Code of the State of C.a!i.fomia, as ama1ded, the following infommion is required for each sub-contractor who will perfoim won: amounting to more than one half of one percent {0 .5%) of the Tob.l Base Bid or $I 0,000 (whichever is greate:r). Photocopy this form for additional firms.. Federal Project Kumber: _______ _ Subcontractor Name and Lin,e Item & Description Subcontract Percentage of contractor DBE IIBE cert Annual Gross Receipts location Amoont Bidltemsub- LicenseNumber (Y/N} Number
contracted DIR Reg Number
Name: i /;/: ' D <Sl million
' . ; LJ <Ss million
City,State: 1------1 Ve\,; •··.• r l <Stomiijion
/ ?, •···••··· n <$15 mi~ion .,{t"i. ?J..... Ag;= of Firm: yrs.
N;;me: /h/S) () f7 <$1 million
_ \.! Y n <$5 million
Crty, State: 1-------1 \ti n <S10 million
(:~}}Y?~if k n <S15 million
(J;/ ~;;?: AE<: of Firm: ,,rs.
Name: Y;i~c?,•'' n <$1million
. :f''f i I J <$5 million
cit;, stat,;: [>?\;f{Jf/.~ n <510 miHion
½"i}i:01;~· D <515 million
.1/•· . , . , AEe of Firm: vrs.
Name: ;•; '. ;(,cf),'•,! n <$1 million
tj:i,\.'. /';:c I l <$5 million
Cit;,Stat,;: { ( .;;{ n <$10million
; > :; o I I <$15 million
:->J; '.< :, . Age of Firm: )'rs.
Name: ;.: : • C\ n <$1 million
'.'.{/;';b'. . D <ss million City, Stat,;: }::i : ;3 □ <$10 miliion ,. ?:> D <515 mif,ion
• :o••!. J • : '· A!,;e of Firm: yrs.
Name: ~:/~{ D <$1 million I l <Ssmillion
Cit;, Stat!:: r--------t n <510 million
• ( n <$15 mii!lion
C✓ AU of Firm: yrs.
Distribution: 1) Original-tocal Agency File 21 copy-DLAE w/ Award Package m X :::c -m --I .. ..
..;a.
I\)
I
m - -C .-
m m ml> C
zC
c~ z en or ::, -I (J)
C -I
mo !!! ,,
"tJ (J)
)> C
~~
..;a. 0
z
-I
~
0 -I
0 :;Q
(J)
-N
\0
Exhibit 12-B Bidder's List of Subcontractor (DBE and Non-DBE) Part 2 In acoorcbnce with Title 49, Section 26 oflhe Cede of Federal. R.e.,=ulations, the Bidder shall list all mb::ontractor who provided a quote or bid but we~ not selected to participate as a sub::ontractor on this proj&.-t Photocop)' this form fur addirionil firms. Federal. Project Nmnber: ________ _ subcontractor Name and
Location
Nii.me:
City, State:
Name:
Cit'(, State:
Name:
Ctty, State:
Name:
City, State:
r-i;;me:
City, state:
Name:
City, State:
Line Item & Description subcontract
AmcM.lnt
Distribution: 11 ori:ginal-Ulcal Agenq· File 2] copv-DLAE w/ Award Padage Percentage of
!lid Item Sub
contracted
COOtractor
license Number
DIR Reg Number
OBE
(Y/N)
OOEcert
Number
AMuill Gross Receipts
<Si million
<ssmilliori
<$10 mii!ion
<Si million
<SSmillior,
<Srnmiiiion
n <$15 million
Age of Firn1: yrs.
<$1mlllior,
<Ssmillion
<S1omi'1ion
D <$15 mi!iion
Age of Firm: yrs.
<$1 million
<Ssmillion
<S10million
<S15million
Age of Firm:_ ·~rs.
<Slmillion
<SSmillion
<S10 million
<515mil!ion
Age of Firn1: ~ yrs.
<$1million
<Ssmillior,
<s1omiliion
<$15million
A_g;e of Firn1: ·~rs ..
m
>< :c -m --t .. ..
~
.,._,.,
I
m - ... C , ...
mm m-l> C
zC
c~ z ci,
0 r-:::s -I (/)
C -t
~o -,, .,, (/)
)> C
:::c m -t 0 t,-,,)0
z -t
$!
0 -t
0 :::c
(/)
Local Assistance Procedures Manual
APPENDIX A TO EXHIBIT B
Exhibit 4-C
Master Agreement
During the performance of this Agreement, ADiv.lINISTERING AGENCY, for itself, its assignees and successors in interest (hereinafter collectively refen·ed to as ADj\!.IlNISTERING AGENCY) agrees as follows:
(1) Compliance with Regulations: ADwiINISTERING AGENCY shall comply with the regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the REGULATIONS), which are herein incorporated by reference and made a part of this agreement.
(2) Nondiscrimination: ADiv.lINISTERING AGENCY, with regard to the work performed by it during the AGREEivffiNT, shall not discriminate on the grounds of race, color, sex, national origin, religion, age, or disability in the selection and retention of sub-applicants, including procurements of materials and leases of equipment. ADMINISTERING AGENCY shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the REGlJ1.,ATIONS, including employment practices when the agreement covers a program set fotth in Appendix B of the REGULATIONS.
(3) Solicitations for Sub-agreements, Including Procurements of }.1aterials and Equipment: In all solicitations either by competitive bidding or negotiation made by AD:tvllNISTERING AGENCY for work to be performed under a Sub-agreement, including procurements of materials or leases of equipment, each potential sub-applicant or supplier shall be notified by ADiv.lINISTERING AGENCY of the AD:tvfINlSTERING AGENCY's obligations under this Agreement and the REGULATIONS relative to nondiscrimination on the grounds of race, color, or national origin. ( 4) Information and Reports: ADN1INISTERING AGENCY shall provide all information and reports required by the REGlJLATIONS, or directives issued pursuant thereto, and shall permit access to ADMINISTERING AGENCY's books, records, accounts, other sources of information, and its facilities as may be determined by STATE or FHWA to be pertinent to ascertain compliance with such REGULATIONS or directives. \Vhere any information required of AD!\1INISTERING AGENCY is in the exclusive possession of another who fails or refuses to furnish this information, ADi'v1INISTERING AGENCY shall so certify to STATE or the FHW A as appropriate, and shall set fo11h what efforts AD:tvllNISTERING AGENCY has made to obtain the information. (5) Sanctions for Noncompliance: In the event of AD:tvllNISTERING AGENCY's noncompliance with the nondiscrimination provisions of this agreement, STATE shall impose such agreement sanctions as it or the FHWA may determine to be appropriate, including, but not limited to:
(a) withholding of payments to ADiviINISTERING AGENCY under the Agreement within a reasonable period of time, not to exceed 90 days; and/or (b) cancellation, termination or suspension of the Agreement, in whole or in part. (6) Incorporation of Provisions: ADi\1INISTERING AGENCY shall include the provisions of paragraphs (1) through (6) in every sub-agreement, including procurements of materials and leases of equipment, unless exempt by the REGULATIONS, or directives issued pursuant thereto.
APPENDIX
131
LOCATION MAP
132
0 AJ:l>,,_
- te#llirAAU.tf M~
-- Ml:W?&O£'nlilt...X
LOCATION MAP
SCALE: NT$
City of ~!FE
Hffl.OPMEHT SERVICl!S
t'~l:R1NG m:l-J/£CT!, .I.NO STJ\M'l)\JUl-S
15'1!2W:1 ....... t'.21:Q}~
JOHN MUIR PROJECT
LOCATION MAP
CITY OF MERCED
133
lilt, i,t ....
fl{rE> 11/t G
ttl Pt .m
--
lh ..,_,ram,
"CEM 1201 "- SUBCONTRACTING REQUEST
STATE OF CALIFORNIA• DEPARTMENT OF TRANSPORTATION
SUBCONTRACTING REQUEST
CEM-1201 (REV. 5/2012)
I REQUEST NUMBER
CONTRACTOR NAME COUNTY !ROUTE
BUSINESS ADDRESS CONTRACT NUMBER
CITY AND STATE IZIPCODE FEDERAi-AiD PROJECT NUMBER. (from special provisions) SUBCONTRACTORS BID ITEM PERCENTAGE CHECK IF: DESCRIBE WORK (Name, Business Address, Phone) NUMBER(S) OF BID ITEM (See Calegortes Below) WHEN LESS lHAN 100"/4 SUBCONTRACTED 1 2 3 OF WORK IS SUBCONTRACTED
Categories: 1 Specialty 2 Listed Under Fair Practices Act 3 Certified DBE/UDBE/DVBE I Certify that:
The Standard Speciftcalions for labor set forth in the contract apply to the subcontracted work.
If applicable, (Federal-aid projects only) Section 14 (Federal requirements) of the special provisions has been inserted in the subcontracts and will be incorporated in any lower~tier subcontract. VVritten contracts have been executed for the subcontracted work noted above.
CONTRACTOR'S SIGNATURE
This section is to be completed by the resident engineer.
1. Total of bid items
2. Specialty items previously approved Of applicable, see Note in the instructions)
3. Specialty items this request (if applicable, see Note in the instructions)
4. Total Qines 2 + 3)
5. Contractor must perform with own forces (lines 1 minus 4) x ___ %
6. Bid items previously subcontracted
7. Bid items subcontracted (this request)
8. Total Qines 6 + 7)
9. Balance of work contractor to perform (line 1 minus 8)
RESIDENT ENGINEER'S SIGNATURE
$ ____________ _
$ ___________ _
$ ____________ _
$ ____________ _
$ ____________ _
DOLLAR AMOUNT
BASED ON
BID AMOUNT
COPY DISTRIBUTION: Original • Contractor Copy - Resident Engineer Copy • District Construction Office Copy- OBEO - [email protected] or FAX to (916) 324-1949
ADA Notice For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD (916) 654-3880 or write Records and Forms Managemen~ 1120 N Street MS-89, Sacramento, CA 95814.
STATE OF CALIFORNIA• DEPARTMENT OF TRANSPORTATION
SUBCONTRACTING REQUEST
CEM-1201 (REV 512012) Page 2 of2
INSTRUCTIONS
All first-tier subcontractors muse be included on a subcontracting request.
Before subcontracting work starts, the contractor will submit an original CEM-1201 according to the Standard Specifications. After approval, tt,e RE returns the original to the contractor and complete the remaining distribution as listed on the bottom of the form.
When an entire item is subcontracted, show the contractor's bid price.
When a portion of an item is subcontracted, describe the portion and show the percentage of the bid item and value.
In August 2008, the Standard Specifications were amended to eliminate specialty items. Enter Zeros or applicable amounts for specialty items should be entered in lines 2 and 3 of this form, depending on whether the contract includes the amendment.
THIS FORM IS NOT TO BE USED FOR SUBSTITUTIONS OF SUBCONTRACTORS AND UDBE, DVBE OR SMALL BUSINESS ENTITIE
CITY OF MERCED STANDARD DESIGNS
THE FOLLOWING STANDARDS ARE FOR REFERENCE ONLY
REFER TO THE CITY OF MERCED WEBSITE FOR THE COMPLETE LISTING OF
STANDARD DETAILS
http://www.cityofmerced.org/depts/engineering division/standard designs/defa ult.asp
136
STATE GENERAL PREVAILING WAGE RATES
General prevailing wage determination
Made by the Director of Industrial Relations
Pursuant to California Labor Code part 7,
Chapter 1, article 2, sections 1770, 1773, and 1773.1
State of California Department of Industrial Relations Website:
http://www.dir.ca.gov/OPRL/PWD/index.htm
137
FEDERAL MINIMUM WAGE RATES
See the Department of Industrial Relations on the internet for the current wage rates at https://www.dir.ca.gov/oprl/dprewagedetermination.html or contact the City of Merced Engineering Department for a hard copy.
138
LIIGDtD
0 N:>lo.-
- li!Z"NJWII. kUEl' ~"!
- IEWffinfS~
LOCATION MAP
SC'.ALE: NTS
City of !!:J.!rf:!_a
NVl!LOPIJIB:HT Sl!IRVICl!S
~f!l'l'lNQ"'11!il~Cff.aJi/O !iTJlif4Ql,l!lll'i
eraw.1•~ ,~~,
139
JOHN MUIR PROJECT
LOCATION MAP
CITY OF MERCED
l\lt. 11ft ,,i::,,
Plf'E, 1 't 4i
<JI,"" ....
--..... J'H!XJ1
PUCHASING DEPARTMENT DRIVING DIRECTIONS
DRIVING DIRECTIONS
CIVIC CENTER TO
PURCHASING OF'FICE
DIRECTIONS: DRIVE NORTH ON •M• STREET
TURN LEFT ON WEST 25TH STREET
TURN Rtf3HT ON •a• STREET
140
REGULATION VIII - FUGITIVE PM10 PROHIBITIONS
San Joaquin Valley
Air Pollution Control District
COMPLIANCE ASSISTANCE BULLETIN
August 2006
Regulation VIII - Fugitive PM10 Prohibitions
Requirements on Paved and Unpaved Public Roads
District Rule 8061(Paved and Unpaved Roads) of Regulation VIII (Fugitive PM10 Prohibitions) specifies the design criteria for constructing new or modifying existing paved roads and the types of control measures required for limiting fugitive dust emissions from unpaved roads and shoulders. Several compliance dates and deadlines described in the rule apply specifically to city, county, and state agencies. The purpose of this bulletin is to summarize the new requirements for public agencies that own or maintain paved and unpaved roads. The entire rule may be found at www.valleyair.org/rules/1 ruleslist.htm - reg8. • Constructing New Unpaved Roads: Effective October 1, 2004, constructing a new unpaved road is prohibited in all urban areas unless the unpaved road is used for a temporary activity that does not exceed six months of use over a consecutive three-year period. Temporary activities may include construction access roads, special events, or traffic detours. The unpaved surface must be maintained in a stabilized condition at all times in order to control fugitive emissions. • PM10-Efficient Street Sweepers: These requirements apply to the routine cleaning of existing paved public roads within urban areas. Effective July 1, 2005, an agency or its contractor may only purchase PM10-efficient street sweepers for their fleets and at least one sweeper must be placed into service by July 1, 2008. PM10-efficient street sweepers are to be used along routine street sweeper routes, which have been predetermined and prioritized by the agency as having paved curbs with the greatest actual or potential for dirt and silt loading. If an agency cannot meet these provisions due to budgetary constraints, a statement of financial hardship must be submitted to the District and the USEPA for review and approval. • Cleaning Paved Roads after a Storm Event: Within 24 hours of discovery, the agency or contractor responsible for maintaining the roadway must remove the accumulated mud and dirt from the paved road or restrict vehicles from traveling over the mud and dirt until the materials can be removed. This requirement applies if the accumulated mud and dirt is a result of wind or water erosion and runoff, is at least one inch thick, and covers an area of at least 50 square feet. Cleanup may be performed manually with a shovel and broom, or with a conventional or PM10-efficient street sweeper, but must be performed in a manner that minimizes fugitive dust. Using a blowing device or a dry rotary brush or broom is prohibited.
Redirecting traffic is one way to restrict vehicles from traveling over the mud and dirt. Upon agency notification, the District may approve an extension of the 24-hour cleanup requirement if restricting vehicles is deemed unsafe and removing the mud and dirt is not possible within 72 hours because crews are not available over a weekend or holiday.
Northern Region Office
4800 Enterprise Way
Modesto. CA 95356-8718
(209) 557-6400 + FAX (209) 557-6475
Central Region Office
1990 East Getlysburg Avenue
Fresno. CA 93726-0244
(559) 230-6000 • FAX (559) 230-6062
141
Southern Region Office
2700 "M" Street, Suite 275
Bakersfielcl, CA 93301-2373
(661) 326-6900 + FAX (661) 326-6985
Requirements on Paved and Unpaved Public Roads
August 2006
Page2
• Posting Speed Limit Signs on Unpaved Roads: Effective October 1, 2005, public agencies must establish a maximum speed limit of 25 miles per hour for the unpaved roads under their jurisdictions. This requirement applies to the unpaved road segments where vehicle traffic reaches or exceeds 26 annual average daily trips (AADT). At a minimum, agencies are to post at least one speed limit sign in each direction for every mile of unpaved road located within an urban area, and one sign in each direction for every two miles of unpaved road within a rural area. For example, an unpaved road located within an urban area that is ½ mile long and exceeds 26 AADT requires at least one sign posted in each direction.
The unpaved surface must be maintained in a stabilized condition at all times in order to control fugitive emissions.
• Paving Existing Unpaved Roads and Paving or Stabilizing Unpaved Shoulders: On January 1, 2005, agencies provided the District with a report listing each unpaved road located within an urban area and each paved road with unpaved shoulders within urban and rural areas. On July 1, 2005, agencies provided a report listing each unpaved road located within a rural area. These reports include the length in miles and the AADT for each subject road and unpaved shoulder within the agency's jurisdiction.
As of January 1, 2005, agencies are to pave an annual average of 20 percent of the unpaved roads listed in their urban area unpaved road report, thereby paving 100 percent of these unpaved roads by January 1, 2010. This requirement does not apply to rural unpaved roads.
In urban areas, agencies are to pave or stabilize at least four-feet of unpaved shoulders on at least 50 percent of the existing paved roadways having the highest AADT. In rural areas, this is required on at least 25 percent of the existing paved roadways with the highest AADT. Compliance with these provisions must be complete by January 1, 2010.
If an agency cannot meet these provisions due to budgetary constraints, a statement of financial hardship must be submitted to the District and the USEPA for review and approval. • Incremental Progress Reports: Due on April 1 of each year, from 2006 through 2010, agencies must report their incremental progress to the District by reporting the total miles of urban unpaved roads that were paved over the previous calendar year, the total miles of unpaved shoulders that were paved or stabilized over the previous calendar year, and the percentage of cumulative miles treated relative to the original reports.
For more information please contact the Compliance Department of the District office nearest to you.
Information on Regulation VIII is available on the District's website at:
www.valleyair.org
142
San Joaquin Valley
AIR POLLUTION CONTROL DISTRICT
COMPLIANCE ASSISTANCE BULLETIN
April 2007
Fugitive Dust Control at Construction Sites: New Requirements Regulation VIII, Fugitive PM10 Prohibitions, of the District's Rules and Regulations apply to many activities that generate fugitive dust, and particularly lo construction sites.
Fugitive dust is emitted into the air by activities that disturb the soil, such as earthmoving and vehicular/equipment traffic on unpaved surfaces. Windblown dust is also of concern where soil has been disturbed at construction sites.
The District adopted Regulation VIII in 1993 and its most recent amendments became effective on October 1, 2004. This is a basic summary of the regulation's requirements as they apply to construction sites.
These regulations affect all workers at a regulated construction site, including everyone from the landowner to the subcontractors. Violations of Regulation VIII are subject to enforcement action including fines.
Visible Dust Emissions (VOE) may not exceed 20% opacity during periods when soil is being disturbed by equipment or by wind at any time. Visible Dust Emissions opacity of 20% means dust that would obstruct an observer's view of an object by 20%. District inspectors are state certified to evaluate visible emissions. Dust control may be achieved by applying water before/during earthwork and onto unpaved traffic areas, phasing work to limit dust, and setting up wind fences to limit wind blown dust.
Soil Stabilization is required at regulated construction sites after normal working hours and on weekends and holidays.
This requirement also applies to inactive construction areas such as phased projects where disturbed land is left unattended. Applying water to form a visible crust on the soil and restricting vehicle access are often effective for short term stabilization of disturbed surface areas. Long-term methods including applying dust suppressants and establishing vegetative cover.
Carryout and Trackout occur when materials from emptied or loaded vehicles falls onto a paved surface or shoulder of a public road or when materials adhere to vehicle tires and are deposited onto a paved surface or shoulder of a public road.
Should either occur, the material must be cleaned up at least daily, and immediately if it extends more than 50 feet from the exit point onto a paved road. The appropriate clean-up methods require the complete removal and cleanup of mud and dirt from the paved surface and shoulder. Using a blower device or dry sweeping with any mechanical device other than a PM10-effJcient street sweeper is a violation. Larger construction sites, or sites with a high amount of traffic on one or more days, must prevent carryout and trackout from occurring by installing gravel pads, grizzlies, wheel washers, paved interior roads, or a combination thereof at each exit point from the site. In many cases, cleaning up trackout with water is also prohibited as it may lead to plugged storm drains. Prevention is the best method.
Unpaved Access and Haul Roads, as well as unpaved vehicle and equipment traffic areas at construction sites must have dust control. Speed limit signs limiting vehicle speed to 15 mph or less at construction sites must be posted every 500 feet on uncontrolled and unpaved roads.
Nortlwrn Region Officf'
4800 EntPrprise Way
Modesto, CA 95356-871 8
(209) 557-6400 ♦ FAX (209) 557-6475
C<'ntral Region Office
1990 East Getty,hurg Avenue
Fresno, CA 93726-0244
(559) 230-6000 ♦ FAX \559) 230-6062
143
Southern RPgion Offic<'
2700 ".',\" Street, Suite 275
Bdkersfi<cld, CA 93301-2]73
(661 I 326-6900 ♦ FAX (661) 326-6985
Storage Piles and Bulk Materials have handling, storage, and transportation requirements that include applying water when handling materials, wetting or covering stored materials, and installing wind barriers to limit VDE. Also, limiting vehicle speeds, loading haul trucks with a freeboard of six inches or greater along with applying water to the top of the load, and covering the cargo compartments are effective measures for reducing VDE and carryout from vehicles transporting bulk materials.
Demolition activities require the application of water to the exterior of the buildings and to unpaved surfaces where materials may fall. A Dust Control Plan will be required for large demolition projects. Consider all structures slated for demolition as possibly being regulated due to potential asbestos, per District Rule 4002 - National Emission Standards for Hazardous Air Pollutants. Contact the District well before starting because a 10 working-day notice will likely be required before a demolition can begin.
Dust Control Plans identify the dust sources and describe the dust control measures that will be implemented before, during, and after any dust generating activity for the duration of the project. Owners or operators are required to submit plans to the District at least 30 days prior to commencing the work for the following:
• Residential developments of ten or more acres of disturbed surface area. • Non-residential developments of five or more acres of disturbed surface area. • The relocation of more than 2,500 cubic yards per day of materials on at least three days.
Operations may not commence until the District has approved the Dust Control Plan. A copy of the plan must be on site and available to workers and District employees. All work on the site is subject to the requirements of the approved dust control plan. A failure to abide by the plan by anyone on site may be subject to enforcement action.
Owners or operators of construction projects that are at least one acre in size and where a Dust Control Plan is not required, must provide written notification to the District at least 48 hours in advance of any earthmoving activity.
Record Keeping is required to document compliance with the rules and must be kept for each day any dust control measure is used. The District has developed record forms for water application, street sweeping, and "permanent" controls such as applying long term dust palliatives, vegetation, ground cover materials, paving, or other durable materials. Records must be kept for one year after the end of dust generating activities (Title V sources must keep records for five years).
Exemptions exist for several activities. Those occurring above 3,000 feet in elevation are exempt from all Regulation VIII requirements. Further. Rule 8021 - Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities exempts the following construction and earthmoving activities:
• Blasting activities permitted by California Division of Industrial Safety. • Maintenance or remodeling of existing buildings provided the addition is less than 50% of the size of the existing building or less than 10,000 square feet (due to asbestos concerns, contact the District at least two weeks ahead of time).
• Additions to single family dwellings.
• The disking of weeds and vegetation for fire prevention on sites smaller than ½ acre. • Spreading of daily landfill cover to preserve public health and safety and to comply with California Integrated Waste Management Board requirements.
Nuisances are prohibited at all times because District Rule 4102- Nuisance applies to all construction sources of fugitive dust, whether or not they are exempt from Regulation VIII. It is important to monitor dust-generating activities and implement appropriate dust control measures to limit the public's exposure to fugitive dust.
For more information please contact the Compliance Division of the District office nearest to you. Information on Regulation VIII, where you may obtain copies of record keeping forms, the Dust Control Plan template, and the Construction Notification form. is available on the District's website at:
www.vatleyair.org. under Compliance Assistance/Dust Control. 144
"General Decision Number: CA20220018 04/01/2022
Superseded General Decision Number: CA20210018
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.l(a)(2)-(60).
IIf the contract is entered I,
linto on or after January 30, I
Executive Order 14026
generally applies to the
contract. 12022, or the contract is
!renewed or extended (e.g., an
!option is exercised) on or
!after January 30, 2022:
I
I I
I
I
I
• The contractor must pay
all covered workers at
least $15.00 per hour (or
the applicable wage rate
listed on this wage
determination, if it is
higher) for all hours
spent performing on the
contract in 2022.
'------------- -------------!If the contract was awarded on. lor between January l, 2015 andl
!January 29, 2022, and the I
!contract is not renewed or I,
!extended on or after January I
130, 2022: I
I I
I I
I I I I
I I
Executive Order 13658
generally applies to the
contract.
The contractor must pay all
covered workers at least
$11.25 per hour (or the
applicable wage rate listed
on this wage determination,
if it is higher) for all
hours spent performing on
that contract in 2022. , ___________ ! __________ _
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a
conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at
https://www.dol.gov/agencies/whd/government-contracts.
Modification Number
0 1
2 3
4 5
6 ASBE0016-004 01/01/2021
Publication Date
01/07/2022
01/14/2022
01/21/2022
02/18/2022
02/25/2022
03/25/2022
04/01/2022
AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,
MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &
TOULMNE COUNTIES
AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO & SANTA
CLARA COUNTIES
Rates
Asbestos Removal
worker/hazardous material
handler (Includes
preparation, wetting,
stripping, removal,
scrapping, vacuuming, bagging
and disposing of all
insulation materials from
mechanical systems, whether
they contain asbestos or not)
Area 1 ...................... $ 30.45
Area 2 .•.........•.•.••..... $ 36.53
ASBE0016-008 01/01/2021
Fringes
10.60 9.27
AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN
FRANSICO, SAN MATEO, SANTA CLARA, & SANTA CRUZ
AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, SAN JOAQUIN, STANISLAU, & TUOLUMNE
Rates
Asbestos Workers/Insulator
(Includes the application of
all insulating materials,
Protective Coverings,
Coatings, and Finishes to all
types of mechanical systems)
Area 1 ...................... $ 74.16
Area 2 •...•...•.•••....•.•.. $ 46.81
BOIL0549-001 01/01/2021
Fringes
23.58 33.50
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: REMAINING COUNTIES
Rates
BOILERMAKER
Area 1 ..•.....••.•.•.•.•.••. $ 49.62
Area 2 .....••...••.•.•••..•• $ 45.60
BRCA0003-001 08/01/2021
Rates
MARBLE FINISHER ••.•••.•...•••.••. $ 37.72
BRCA0003-003 08/01/2021
Rates
MARBLE MASON .•.•••.•...••..•..•.• $ 53.17
BRCA0003-005 05/01/2020
Rates
BRICKLAYER
( 1) Fresno, Kings,
Madera, Mariposa, Merced ..•• $ 43.68
( 7) San Francisco, San
Mateo ••••••.•••.••••.•....•. $ 47.65
( 8) Alameda, Contra
Costa, San Benito, Santa
Clara •.•••••.•..••.•......•. $ 49.42
( 9) Calaveras, San
Joaquin, Stanislaus,
Toulumne •••..••..••••.••.••. $ 45.12
(16) Monterey, Santa Cruz .•• $ 45.88
BRCA0003-008 07/01/2021
Rates
TERRAZZO FINISHER •.••••..•••..•.. $ 39.95
TERRAZZO WORKER/SETTER ••.••••.••• $ 53.03
BRCA0003-011 04/01/2019
Fringes
41.27 38.99
Fringes
17.64 Fringes
29.10 Fringes
22.19 26.77
22.70 21.55
25.02 Fringes
18.46 28.34
AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz
AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne
AREA 3: Fresno, Kings, Madera, Mariposa, Merced
Rates Fringes
TILE FINISHER
Area 1 .•.•..••.••••..•..••.. $ 29.94
Area 2 •.••••••.•.•.••...••.• $ 25.60
Area 3 .........•...•.••..... $ 26. 58
Tile Layer
Area 1 ..•••.••.••...•....•.• $ 49.90
Area 2 ...................... $ 42.67
Area 3 •.••••••.••••.•.....•• $ 40.27
CARP0022-001 07/01/2021
16.38 14.30
15.65 19.16
16.81 18.58
San Francisco County
Rates
Carpenters
Bridge Builder/Highway
Carpenter •..•••..••..••.•.•• $ 54.85
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer ..••.•••..••••..••..•.. $ 55.00
Journeyman Carpenter ••..•••. $ 54.85
Millwright •••.•..••......•.• $ 54.95
CARP0034-001 07/01/2021
Rates
Diver
Assistant Tender, ROV
Tender/Technician •...••...•• $ 54.10
Diver standby •....•.•.•.•..• $ 60.51
Diver Tender ••...•...•.•.••• $ 59.51
Diver wet ••••••..•••••••.••. $ 103.62
Manifold Operator (mixed
gas) .•.•.•..•••.•........••. $ 64,51
Manifold Operator (Standby).$ 59.51
DEPTH PAY (Surface Diving):
050 to 100 ft $2.00 per foot
101 to 150 ft $3.00 per foot
151 to 220 ft $4.00 per foot
221 ft.-deeper $5.00 per foot
SATURATION DIVING:
Fringes
31.49 31.49
31.49 33.08
Fringes
34.69 34.69
34.69 34.69
34.69 34.69
The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under
pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1. 00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP0034-003 07/01/2021
Rates
Piledriver ....................... $ 54.10
Fringes
34.69 CARP0035-007 07/01/2020
AREA l: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties
Rates
Modular Furniture Installer
Areal
Installer •..••..•..•••••.•• $ 28.76
Lead Installer ..•....•••.•• $ 32.21
Master Installer •..•.•....• $ 36.43
Area 2
Installer ....•..•..•••..•.. $ 26.11
Lead Installer ..•...••..... $ 29.08
Master Installer •.••.•.•••• $ 32.71
Area 3
Installer •.•••..•.••...••.• $ 25.16
Lead Installer .•••.•.••...• $ 27.96
Master Installer ••..•.•...• $ 31.38
CARP0035-008 08/01/2020
Fringes
22.53 23.03
23.03 22.53
23.03 23.03
22.53 23.03
23.03 AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: San Joaquin
AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties
Rates
Drywall Installers/lathers:
Area 1 •••..•..••••...•••.••• $ 52.65
Area 2 •••.•.•••....•.••...•. $ 46. 77
Area 3 ...................... $ 47.27
Area 4 •••..•••••••••......•• $ 45.92
Drywall Stocker/Scrapper
Area l •.•....••....•••••..•. $ 26.33
Area 2 •.•.••••.•.•.•.•..•••• $ 23.39
Area 3 •••.•••.••...••.•••.•• $ 23.64
Area 4 ••••.•••.•••...•••.••• $ 22.97
CARP0152-001 07/01/2020
Contra Costa county
Carpenters
Bridge Builder/Highway
Rates
Carpenter .•••••..•.•..•.•.•. $ 52.65
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Fringes
31.26 31.26
31.26 31.26
18.22 18.22
18.22 18.22
Fringes
30.82 Steel Shoring Erector, Saw
Filer ••••..•...•.•••.••••••• $ 52.80
Journeyman Carpenter ••••..•• $ 52.65
Millwright •••••..••..••..••• $ 52.75
CARP0152-002 07/01/2020
San Joaquin County
Carpenters
Bridge Builder/Highway
Rates
Carpenter ..•.••....•••.•.•.. $ 52.65
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer •.•••..•••••••.••••.••• $ 46.92
Journeyman Carpenter ..••••.• $ 46.77
Millwright .•••......••..•... $ 49.27
CARP0152-004 07/01/2020
30.82 30.82
32.41 Fringes
30.82 30.82
30.82 32.41
Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties Rates
Carpenters
Bridge Builder/Highway
Carpenter ••••••••..••....•.• $ 52.65
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel scaffold &
Steel Shoring Erector, Saw
Filer •......••.•.•.•..••...• $ 45.57
Journeyman Carpenter •.•....• $ 45.42
Millwright ••.•..••••..••••.• $ 47.92
CARP0217-001 07/01/2021
San Mateo County
Carpenters
Bridge Builder/Highway
Rates
Carpenter ••••••••.••••••.••• $ 54.85
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer ..•...••••.••..••••.••. $ 55.00
Journeyman Carpenter ..••.••• $ 54.85
Millwright ••••.•.•..••••.••. $ 54.95
CARP0405-001 07/01/2021
Santa Clara County
Rates
Carpenters
Bridge Builder/Highway
Carpenter .•.•.••.••.•••....• $ 54.85
Fringes
30.82 30.82
30.82 32.41
Fringes
31.49 31.49
31.49 33.08
Fringes
31.49 Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer .•...•••.••...••.•....• $ 55.00
Journeyman Carpenter ...•.... $ 54.85
Millwright .................. $ 54.95
CARP0405-002 07/01/2021
San Benito County
Rates
Carpenters
Bridge Builder/Highway
Carpenter .••.•.•••••......•• $ 54.85
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer •.•••.•••...•..••••.••. $ 49.12
Journeyman Carpenter .•.•...• $ 48.97
Millwright .••.••••.....••.•. $ 51.47
CARP0505-001 07/01/2021
Santa Cruz County
carpenters
Bridge Builder/Highway
Rates
Carpenter .•.•••.••.••••..•.• $ 54.85
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer ..•...•••.••••.••••.... $ 49.12
Journeyman Carpenter ••...... $ 48.97
Millwright .................. $ 51.47
CARP0605-001 07/01/2021
Monterey County
Rates
Carpenters
Bridge Builder/Highway
Carpenter ••••.•••.••••••.••. $ 54.85
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer .•.•..•••••••.••.•.•.•. $ 49.12
Journeyman Carpenter ...•.•.• $ 48.97
Millwright .•••.•.••.••...••• $ 51.47
CARP0701-001 07/01/2021
Fresno and Madera Counties
Rates
31.49 31.49
33.08 Fringes
31.49 31.49
31.49 33.08
Fringes
31.49 31.49
31.49 33.08
Fringes
31.49 31.49
31.49 33.08
Fringes
Carpenters
Bridge Builder/Highway
Carpenter ••...••.••..•...••• $ 54.85
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer ••••••.••••.•..••••.•.. $ 47. 77
Journeyman Carpenter ..••.••• $ 47.62
Millwright •••••••••..••.•••. $ 50.12
CARP0713-001 07/01/2021
Alameda County
Carpenters
Bridge Builder/Highway
Rates
Carpenter •.••••••••..•••.••• $ 54.85
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer •.••.•••.•..•.......... $ 55.00
Journeyman Carpenter •••••••• $ 54.85
Millwright ..•..•.....••....• $ 54.95
CARP1109-001 07/01/2021
Kings County
Carpenters
Bridge Builder/Highway
Rates
Carpenter .•.•.•••••.•....... $ 54.85
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer •••••.•••.••••••..••.•• $ 47. 77
Journeyman Carpenter •..••••• $ 47.62
Millwright .•...•••....•.•..• $ 50.12
ELEC0006-004 12/01/2021
SAN FRANCISCO COUNTY
Rates
Sound & Communications
Installer •...••.••.........• $ 48.43
Technician •••..•••.••.•..•.• $ 55.69
31.49 31.49
31.49 33.08
Fringes
31.49 31.49
31.49 33.08
Fringes
31.49 31.49
31.49 33.08
Fringes
3%+23.15
3%+23.15
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
ELEC0006-007 06/01/2021
SAN FRANCISCO COUNTY
Rates
ELECTRICIAN ..•..•••••••........•• $ 80.00
ELEC0100-002 09/01/2021
FRESNO, KINGS, AND MADERA COUNTIES
Rates
ELECTRICIAN .••.••••.••.•••..•...• $ 41.00
ELEC0100-005 12/01/2019
FRESNO, KINGS, MADERA
Rates
Communications System
Installer .•.•..••••••..•••.. $ 35.25
Technician •..••••.•••.••.••• $ 40.54
SCOPE OF WORK
Fringes
3%+39,215
Fringes
26.18 Fringes
20.86 21.02
Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance,
background-foreground music, intercom and telephone
interconnect, inventory control systems, microwave
transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.
A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
Background foreground music, Intercom and telephone
interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems,
Burglar alarm systems, Low voltage, master clack systems, Multi-media/multiplex systems, Sound and musical
entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video
entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV
D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS SCAOA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and
Baseband and Carriers Point of Sale Systems, VSAT Data
Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems
WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems).
Chases and/or nipples (not to exceed 10 feet) may be
installed on open wiring systems. Energy management
systems. SCAOA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the
scope). Fire alarm systems when installed in raceways
(including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two (2) conditions apply:
l. The project involves new or major remodel building trades construction.
2. The conductors for the fire alarm system are installed in conduit.
ELEC0234-001 12/28/2020
MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates
ELECTRICIAN
zone A ...................... $ 53.41
Zone B ..••.•••.•.•...•.••..• $ 58. 75
Fringes
27.95 28.11
Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 south to the San Luis Obispo County Line
Zone B: Any area outside of Zone A
ELEC0234-003 12/01/2020
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES
Rates
Sound & Communications
Installer •.....•••.•.••.•.•• $ 45.50
Technician ..•..••....••.•••• $ 52.33
Fringes
22.52 22.72
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling} and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
ELEC0302-001 03/01/2021
CONTRA COSTA COUNTY
Rates
CABLE SPLICER •....•.......•.....• $ 63.86
ELECTRICIAN ...................... $ 56. 76
ELEC0302-003 12/01/2020
CONTRA COSTA COUNTY
Rates
Sound & Communications
Installer ..•••..•••••.....•• $ 42.11
Technician ..••.•..•••...•••• $ 44.83
Fringes
29.17 28.95
Fringes
22.52 22.72
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
ELEC0332-001 06/01/2021
SANTA CLARA COUNTY
Rates
CABLE SPLICER .................... $ 86.45
Fringes
42.14 ELECTRICIAN .•.•.••..•......•...•• $ 75.17 41.81
FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, ""Bosun's chairs,"" or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay.
Work on structures of 60 ft. or over (as described above):
to be paid twice the straight-time rate of pay.
ELEC0332-003 12/01/2021
SANTA CLARA COUNTY
Rates
Sound & Communications
Installer .•..••..••..••••••• $ 47.93
Technician ......•••..•...•.. $ 55.12
Fringes
24.088
24.304
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
ELEC0595·001 06/01/2021
ALAMEDA COUNTY
Rates
CABLE SPLICER •.•.••.••.•••.•••••• $ 72.80
ELECTRICIAN .••..••..••......••..• $ 63.30
ELEC0595-002 06/01/2021
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates
CABLE SPLICER •...•....•.••....•.• $ 50.70
ELECTRICIAN
(1) Tunnel work ••.•••.••.•.• $ 44.25
(2) All other work ••..••..• $ 42.25
Fringes
3%+39.94
3%+39.94
Fringes
7.75%+25.58
7.75%+25.58
7.75%+25.58
ELEC0595-006 12/01/2021
ALAMEDA COUNTY
Rates
Sound & Communications
Installer •.••.••••.....•.••• $ 47.93
Technician .••..•.••...•••.•• $ 55.12
Fringes
3%+22.65
3%+22.65
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
ELEC0595-008 12/01/2021
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates
Communications System
Installer •.•••.•••.•••.•.•.• $ 38,24
Technician •.•••.••..•..••..• $ 43.98
Fringes
3%+22.65
3%+22.65
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
ELEC0617-001 06/01/2021
SAN MATEO COUNTY
Rates
ELECTRICIAN ..•..••••..••...•••.•• $ 70.00
ELEC0617-003 12/01/2021
SAN MATEO COUNTY
Rates
Sound & Communications
Installer ..•.•..••....•...•. $ 47.93
Technician ...••....•..•.••.• $ 55.12
Fringes
41.74 Fringes
24.09 24.30
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
* ELEC0684-00112/01/2021
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates
ELECTRICIAN ...•.••.......•..•.... $ 42.50
CABLE SPLICER= 110% of Journeyman Electrician
ELEC0684-004 12/01/2021
Fringes
3%+25.88
MARIPOSAJ MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates
Cormnunications System
Installer .•....•.......••••• $ 38.24
Technician •.••.•......•.••.. $ 43.98
Fringes
23.80 23.97
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
ELEC1245~001 01/01/2022
Rates
LINE CONSTRUCTION
(1) Lineman; Cable splicer •• $ 60.19
(2) Equipment specialist
(operates crawler
tractors, commercial motor
vehicles, backhoes,
trenchers, cranes (50 tons
and below), overhead &
underground distribution
line equipment) ..••.•.•••••. $ 48.08
{3) Groundman •..••••.•...••. $ 36.76
(4) Powderman ..••••..•..•••. $ 51.87
Fringes
22.07 20.86
20.46 18.79
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day,
Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
ELEV0008-001 01/01/2022
Rates
ELEVATOR MECHANIC •••.•.•..••..••. $ 74.54
FOOTNOTE:
Fringes
36.885+a+b
a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
ENGI0003-001 06/28/2021
""AREA 1"" WAGE RATES ARE LISTED BELOW
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.
SEE AREA DEFINITIONS BELOW
Rates
OPERATOR: Power Equipment
(AREA 1:)
GROUP 1 •.•.......•.•••..•.•• $ 53.92
GROUP 2 ••..•.•.•.•.•.•••.•.• $ 52.39
GROUP 3 •.••..•..•••...•.••.• $ 50. 91
GROUP 4 .................... • $ 49.53
GROUP 5 •••••••••••.••••••••• $ 48.26
GROUP 6 ..................... $ 46.94
GROUP 7 •..••••••....••.•.••. $ 45. 80
GROUP 8 •••••.••..•••••..•••• $ 44. 66
GROUP 8-A .................. • $ 42.45
OPERATOR: Power Equipment
(Cranes and Attachments -
AREA 1:)
GROUP 1
Cranes .....•...•......••••• $ 52. 30
Oiler ••....•..•...••....... $ 43.79
Truck crane oiler •••......• $ 46.08
GROUP 2
Cranes .•..•••••••.••••.•.•. $ 50. 54
Oiler ••••..••..•.•••.•••.•• $ 42.83
Truck crane oiler .••.••••.• $ 45.07
GROUP 3
Cranes •••••••••••.••.•.•.•• $ 48.80
Hydraulic ..•..•••.•..•.•..• $ 44.44
Oiler ..•••.•..••.••..••..•. $ 42.55
Truck crane oiler .•.•.••..• $ 44.83
GROUP 4
Cranes ••..••.•.......••••.• $ 45.76
OPERATOR: Power Equipment
(Piledriving - AREA 1:)
GROUP 1
Lifting devices .•......••.• $ 52.64
Oiler •••.••..•..•••..•••.•• $ 43.38
Truck Crane Oiler •••.••..•• $ 45.66
GROUP 2
Lifting devices .••••.•••.•• $ 50.82
Oiler ••••••.••..•••.•••.••. $ 43.11
Truck Crane Oiler •.•.••..•. $ 45.41
GROUP 3
Lifting devices ..•...••..•• $ 49.14
Oiler .••...•..•..•....••.•. $ 42.89
Truck Crane Oiler ••..•..... $ 45.12
GROUP 4
Lifting devices .....••.•... $ 47.37
GROUP 5
Lifting devices .•.•••••..•• $ 44.73
GROUP 6
Lifting devices ••••..••.... $ 42.50
OPERATOR: Power Equipment
(Steel Erection - AREA 1:)
GROUP 1
Cranes ........•••••.••...•. $ 53.27
Oiler .•.....••.••••.•.•.... $ 43. 72
Truck Crane Oiler ••.••..... $ 45.95
GROUP 2
Cranes •......•..•.•..•.•... $ 51.50
Oiler ••.........•.•.••..... $ 43.45
Truck Crane Oiler ••••••.•.• $ 45.73
GROUP 3
Cranes •....•.••.•.•..•...•• $ 50. 02
Fringes
31.54 31.54
31.54 31,54
31.54 31.54
31.54 31.54
31.54 31.15
31.15 31.15
31.15 31.15
31.15 31.15
31.15 31.15
31.15 31.15
31.15 31.15
31.15 31.15
31.15 31.15
31.15 31,15
31.15 31.15
31.15 31.15
31.15 31.15
31.15 31.15
31.15 31.15
31.15 Hydraulic •.•.•..••.•.•...•• $ 45 . 07
Oiler .••••••...••.••••.•••. $ 43.23
Truck Crane Oiler ••...•..•• $ 45.46
GROUP 4
Cranes ••.••.•..•.••.••••.•• $ 48.00
GROUP 5
Cranes •...••...••.••.••.••• $ 46. 70
OPERATOR: Power Equipment
(Tunnel and Underground Work
- AREA 1:)
SHAFTS, STOPES, RAISES:
GROUP 1. ................... $ 47 .52
GROUP 1-A ..•..••........... $ 49.99
GROUP 2 ..•..•.••..•••••••.• $ 46.26
GROUP 3 .................... $ 44.93
GROUP 4 •••••••.••••••.••••• $ 43.79
GROUP 5 ..•••.•••..•.•••.••• $ 42. 65
UNDERGROUND:
GROUP 1 .................... $ 47.42
GROUP 1-A ••...••..•..•••••• $ 49. 89
GROUP 2 .................... $ 46.16
GROUP 3 •••••••••••...•..••• $ 44,83
GROUP 4 .••...••.•••..••.... $ 43.69
GROUP 5 •.•••..•..••.••.•.•• $ 42.55
31.15 31.15
31.15 31.15
31.15 31.15
31.15 31.15
31.15 31.15
31.15 31.15
31.15 31.15
31.15 31.15
31.15 FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP l: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds.
GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat
operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds.
m.r.c.
GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane
mounted continuous flight tie back machine, tonnage to
apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4 cu. yds. and over; long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including l cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track
loader 4 cu. yds. and over; Wheel excavator (up to and
including 750 cu. yds. per hour)
GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade
checker (GPS, mechanical or otherwise); Grooving and
grinding machine; Heading shield operator; Heavy-duty
drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader;
loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller
Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil
stabilizer (P & Hor equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;
Tractor-drawn scraper; Tractor, compressor drill
combinationj Welder; Woods-Mixer (and other similar Pugmill equipment)
GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor,
building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete)
{Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine,
concrete or asphalt); Mine or shaft hoist; Portable
crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled
compactor with dozer; Tractor with boom D6 or smaller;
Trenching machine, maximum digging capacity over 5 ft.
depth; Vermeer T-6008 rock cutter or similar
GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine,
truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600,
Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator;
Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with
attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines
only); Pipe wrapping machine (tractor propelled and
supported); Screed (except asphaltic concrete paving);
Self- propelled pipeline wrapping machine; Tractor;
Self-loading chipper; Concrete barrier moving machine
GROUP 7: Ballast regulator; Boom truck or dual-purpose
A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab
machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip
Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals);
Self-propelled compactor (without dozer}; Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader GROUP 8: Bit sharpener; Boiler tender; Box operator;
Brakeperson; Combination mixer and compressor
(shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator;
Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump
operator; Refrigeration plant; Reservoir-debris tug (self propelled floating); Ross Carrier (construction site);
Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum
sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; vacuum
cooling plant; Welding machine (powered other than by
electricity)
GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper
ALL CRANES AND ATTACHMENTS
GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge
pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons
GROUP 2: Clamshell and dragline over l cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and
including 100 tons; Derrick barge, 100 tons and under;
Self-propelled boom-type lifting device, over 45 tonsj
Tower crane
GROUP 3: Clamshell and dragline up to and including l cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under;
GROUP 4: Boom Truck or dual purpose A-frame truck,
non-rotating over 15 tons; Truck-mounted rotating
telescopic boom type lifting device, Manitex or similar {boom truck) over 15 tons; Truck-mounted rotating
telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons;
PILEDRIVERS
GROUP l: Derrick barge pedestal mounted over 100 tons;
Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons
GROUP 2: Derrick barge pedestal mounted 45 tons to and
including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig GROUP 3: Derrick barge pedestal mounted under 45 tons; Self propelled boom-type lifting device 45 tons and under;
Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under
GROUP 4: Assistant operator in lieu of assistant to engineer; Forklift, 10 tons and over; Heavy-duty repairperson/welder GROUP 5: Deck engineer
GROUP 6: Deckhand; Fire tender
STEEL ERECTORS
GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self propelled boom-type lifting device over 100 tons
GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane
GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under
GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder
GROUP 5: Boom cat
TUNNEL AND UNDERGROUND WORK
GROUP 1-A: Tunnel bore machine operator, 20' diameter or more GROUP 1: Heading shield operator; Heavy-duty repairperson; Mucking machine (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator
GROUP 2: Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator
GROUP 3: Drill doctor; Mine or shaft hoist
GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Motorman
GROUP s: Bit Sharpener; Brakeman; Combination mixer and compressor (gunite); Compressor operator; Oiler; Pump
operator; Slusher operator
AREA DESCRIPTIONS:
POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors]
AREA 1: ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS,
MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE
AREA 2 -NOTED BELOW
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA l AND AREA 2 AS NOTED BELOW:
CALAVERAS COUNTY:
Areal: Remainder
Area 2: Eastern Part
FRESNO COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MADERA COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MARIPOSA COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MONTEREY COUNTY:
Area 1: Remainder
Area 2: Southwestern part
TUOLUMNE COUNTY:
Area 1: Remainder
Area 2: Eastern Part
ENGI0003-008 07/20/2020
Rates
Dredging: (DREDGING:
CLAMSHELL & DIPPER DREDGING;
HYDRAULIC SUCTION DREDGING:)
AREA 1:
(1) Leverman ....•.•••.•.••. $ 49.88
(2) Dredge Dozer; Heavy
duty repairman •..•••..•..•. $ 44.92
{3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator ••.••••.•..•..•••.. $ 43. 80
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler •. $ 40.50
AREA 2:
(1) Leverman ............... $ 51.88
(2) Dredge Dozer; Heavy
duty repairman .••..•.•...•. $ 46.92
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator •••..•.•••..•••.•.. $ 45.80
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler •. $ 42.50
AREA DESCRIPTIONS
Fringes
34.35 34.35
34.35 34.35
34.35 34.35
34.35 34.35
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY
THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Remainder
Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part
Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
FRESNO COUNTY:
Area 1: Remainder
Area 2: Eastern part
GLENN COUNTY:
Area 1: Eastern part
Area 2: Remainder
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border with Shasta County
Area 2: Remainder
MADERA COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
MARIPOSA COUNTY
Area 1: Except Eastern part
Area 2: Eastern part
MONTERREY COUNTY
Area 1: Except Southwestern part
Area 2: Southwestern part
NEVADA COUNTY:
Area 1: All but the Northern portion along the border of Sierra County
Area 2: Remainder
PLACER COUNTY:
Area 1: Al but the Central portion
Area 2: Remainder
PLUMAS COUNTY:
Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part
Area 2: Remainder
SISKIYOU COUNTY:
Area 1: Central part
Area 2: Remainder
SONOMA COUNTY:
Area 1: All but the Northwestern corner
Area 2: Remainder
TEHAMA COUNTY:
Area 1: All but the Western border with Mendocino & Trinity Counties
Area 2: Remainder
TRINITY COUNTY:
Area 1: East Central part and the Northeastern border with Shasta County
Area 2: Remainder
TUOLUMNE COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
ENGI0003-019 06/29/2020
SEE AREA DESCRIPTIONS BELOW
Rates
OPERATOR: Power Equipment
(LANDSCAPE WORK ONLY)
GROUP 1
AREA 1 ••.•••••.••..•••..•.. $ 39.95
AREA 2 •••••••••• ,,., ••••••• $ 41.95
GROUP 2
AREA 1 ............•••...... $ 36.35
AREA 2 ••••••••••••••••••••• $ 38.35
GROUP 3
AREA l .................... . $ 31.74
AREA 2 ••••••••••••••••••••• $ 33.74
GROUP DESCRIPTIONS:
Fringes
30.28 30.28
30.28 30.28
30.28 30.28
GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP.
GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment
shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and
Winch Truck, Backhoe, Forklift, Hydragraphic Seeder
Machine, Roller, Rubber-Tired and Track Earthmoving
Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP.
GROUP 3: Landscae Utility Operator: Small Rubber-Tired
Tractor, Trencher Under 31 HP.
AREA DESCRIPTIONS:
AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPAJ SACRAMENTOJ SAN BENITO, SAN FRANCISCOJ SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES
AREA 2 - MODOC COUNTY
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part
Area 2: Remainder
DEL NORTE COUNTY:
Area 1: Extreme Southwestern corner
Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
FRESNO COUNTY
Area 1; Except Eastern part
Area 2: Eastern part
GLENN COUNTY:
Area 1: Eastern part
Area 2: Remainder
HUMBOLDT COUNTY:
Area 1: Except Eastern and Southwestern parts
Area 2: Remainder
LAKE COUNTY:
Area 1: Southern part
Area 2: Remainder
LASSEN COUNTY:
Area 1: western part along the Southern portion of border with Shasta County
Area 2: Remainder
MADERA COUNTY
Area 1: Remainder
Area 2: Eastern part
MARIPOSA COUNTY
Area 1: Remainder
Area 2: Eastern part
MENDOCINO COUNTY:
Area 1: Central and Southeastern parts
Area 2: Remainder
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern part
NEVADA COUNTY:
Area 1: All but the Northern portion along the border of Sierra County
Area 2: Remainder
PLACER COUNTY:
Area 1: All but the Central portion
Area 2: Remainder
PLUMAS COUNTY:
Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part
Area 2: Remainder
SISKIYOU COUNTY:
Area 1: Central part
Area 2: Remainder
SONOMA COUNTY:
Area 1: All but the Northwestern corner
Area 2: Reaminder
TEHAMA COUNTY:
Area 1: All but the Western border with mendocino & Trinity Counties
Area 2: Remainder
TRINITY COUNTY:
Area 1: East Central part and the Northeaster border with Shasta County
Area 2: Remainder
TULARE COUNTY;
Area 1: Remainder
Area 2: Eastern part
TUOLUMNE COUNTY:
Area 1: Remainder
Area 2: Eastern Part
IRON0377-00l 07/01/2021
ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA & SAN FRANCISCO
COUNTIES
Rates
Ironworkers:
Fence Erector •••.••.••.....• $ 38.08
Ornamental, Reinforcing
and Structural ...••....•.... $ 45.73
PREMIUM PAY:
Fringes
24.91 33.55
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock IRON0433-005 07/01/2020
REMAINING COUNTIES
IRONWORKER
Rates
Fence Erector ••.•••••.•.•••. $ 34.58
Ornamental, Reinforcing
and Structural •..••..•••••.. $ 41.00
PREMIUM PAY:
Fringes
24.81 33.45
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2,00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock LAB00067-002 06/28/2021
AREA ""A"" - ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND
SANTA CLARA COUNTIES
AREA ""B"" - CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, STANISLAUS, AND
TUOLUMNE COUNTIES
Rates Fringes
Asbestos Removal Laborer
All Counties ...•..•••••...•• $ 26.05
LABORER (Lead Removal)
Area A •••..•.•••.•.•....•••• $ 34.37
Area B ..•...•.••..•.•••...•• $ 33.37
12.75 25.95
25.95 ASBESTOS REMOVAL-SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of
asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations.
LAB00073-002 06/28/2021
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person .• $ 33.48
Traffic Control Person I .•.• $ 33.78
Traffic Control Person II ••• $ 31.28
Fringes
26.21 26.21
26,21
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
LAB00073-003 07/01/2021
SAN JOAQUIN COUNTY
LABORER
Rates
Mason Tender-Brick •...••••.• $ 34.09
LAB00073-005 07/01/2021
Rates
Tunnel and Shaft Laborers:
GROUP 1 ..•••...••••••••••••• $ 42 .00
GROUP 2 .•. , •..•.... , ••••..•• $ 41. 77
GROUP 3 ••.•.•.• , •....••• , ••• $ 41.52
GROUP 4 ...•••••••••••••••••• $ 41. 07
GROUP 5 •••••••••.••••••••••• $ 40.53
Shotcrete Specialist ..•••.•. $ 42.52
TUNNEL AND SHAFT CLASSIFICATIONS
Fringes
24.41 Fringes
25.71 25.71
25.71 25.71
25.71 25.71
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
LAB00073-007 06/25/2018
CALAVERAS AND SAN JOAQUIN COUNTIES
LABORER (CONSTRUCTION CRAFT
LABORERS)
Construction Specialist
Rates Fringes
Group ••.••.••..•.••..•••.•.. $ 30.49 23.20
GROUP 1 .••.•••...•...••..••• $ 29.79 23.20
GROUP 1-a .•••...•••••••.••.• $ 30.01 23.20
GROUP 1-c •......••.•.••.••.• $ 29.84 23.20
GROUP 1-e ..•••..••.•••.••••• $ 30.34 23.20
GROUP 1-f •.•••.•....••..•... $ 30.37 23.20
GROUP 2 ..•....••••.•.•.•••.• $ 29.64 23.20
GROUP 3 •••.••..••••.•••.•..• $ 29.54 23.20
GROUP 4 ••.•.•.•.••.••••..•.• $ 23.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS)
(1) New Construction ..•••••. $ 29.54
(2) Establishment Warranty
Period .••.•....••....•..•••• $ 23.23
LABORER (GUNITE)
GROUP 1 ••..••.••••••.•••..•• $ 29.75
GROUP 2 •••••••.••.•.•.•.•••• $ 29.25
GROUP 3 ••..•..•.••..•.....•• $ 28.66
GROUP 4 •••.••..••..•••.••••• $ 28.54
LABORER (WRECKING)
GROUP 1 ••..••..••••••....•.. $ 29.79
GROUP 2 ••...•...••..•....... $ 29.64
FOOTNOTES:
23.20 23.20
22.31 22.31
22.31 22.31
23.20 23.20
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer {including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker {lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive$ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.} In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work}; Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-heldJ pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debrisJ grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection'"'.
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: NozzlemanJ Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi•skilled wrecker (salvaging of other building materials)
LAB00073•009 07/01/2021
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates
LABORER (Plaster Tender) ...••.••. $ 35.82
Fringes
28.45 Work on a swing stage scaffold: $1.00 per hour additional.
LAB00261-003 06/28/2021
SAN FRANCISCO AND SAN MATEO COUNTIES
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Rates
Escort Driver, Flag Person •• $ 34.48
Traffic Control Person I ••.• $ 34.78
Traffic Control Person II .•. $ 32.28
Fringes
26.21 26.21
26.21 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
LAB00261-005 07/01/2021
SAN FRANCISCO AND SAN MATEO COUNTIES
Rates
Tunnel and Shaft Laborers:
GROUP 1 ••••..•.•••.•••.•••.• $ 42.00
GROUP 2 •••.•••...••••.••.•.• $ 41.77
GROUP 3 ..................... $ 41.52
GROUP 4 •••••.•..••.••.••••.• $ 41.07
GROUP 5 .•••••• , •.•..•.••...• $ 40.53
Shotcrete Specialist •...••.• $ 42.52
TUNNEL AND SHAFT CLASSIFICATIONS
Fringes
25.71 25.71
25.71 25.71
25.71 25.71
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Oumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
LAB00261-009 06/25/2018
SAN FRANCISCO, AND SAN MATEO COUNTIES
Rates
LABORER {CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Fringes
Group ...•...•..•••••••.•..•. $ 31.49 23.20
GROUP 1. .................... $ 30. 79 23.20
GROUP 1-a ................... $ 31.01 23.20
GROUP 1-c ..••..••.•.•.•.•... $ 30.84 23.20
GROUP 1-e .••••••••.••..••..• $ 31.34 23.20
GROUP 1-f ..•••......•••.•..• $ 31.37 23.20
GROUP 2 ••.••••....•••...•••• $ 30.64 23.20
GROUP 3 ..................... $ 30.54 23.20
GROUP 4 ••••••••••••••••••••• $ 24.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction ....•... $ 30.54
(2) Establishment Warranty
Period .••••••••.•......•••.• $ 24.23
LABORER {WRECKING - AREA A:)
GROUP 1 ..................... $ 30.79
GROUP 2 ••••••••••••••••••••• $ 30. 64
Laborers: (GUNITE - AREA A:)
GROUP 1 ..................... $ 30. 75
GROUP 2 ••••...••••••.••••.•• $ 30.25
GROUP 3 ••.•••.....•.•.••..•• $ 29.66
GROUP 4 ..................... $ 29.54
FOOTNOTES:
23.20 23.20
23.20 23.20
22.31 22.31
22.31 22.31
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayerj Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2'"' or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group l wage rates. '"'Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive$ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of '"'form stripping, cleaning and oiling and moving to the next point o-f erection'"'.
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Patman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
LABO0261-011 07/01/2021
SAN FRANCISCO AND SAN MATEO COUNTIES:
Rates
MASON TENDER, BRICK ••.•••..•••••• $ 34.85
Fringes
26.32 FOOTNOTES: Underground work such as sewers, manholes, catch basins, sewer pipes, telephone conduits, tunnels and cut trenches: $5.00 per day additional. work in live sewage:
$2.50 per day additional.
LAB00261-014 07/01/2021
SAN FRANCISCO AND SAN MATEO COUNTIES:
Rates
PLASTER TENDER ................... $ 38.28
Fringes
29.43 Work on a swing stage scaffold: $1.00 per hour additional.
LAB00270-003 06/28/2021
AREA A: SANTA CLARA
AREA B: MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person
Rates
Area A ••.••.••.•.•••.•..••• $ 34.48
Area B .•....•.....•.•..•••• $ 33.48
Traffic Control Person I
Area A ..................... $ 34. 78
Area B ••...••......•.•..•.• $ 33. 78
Traffic Control Person II
Area A •••.•.....•.••...•..• $ 32.28
Area 8 ••••..•..•..••••.•.•• $ 31.28
Fringes
26.21 26.21
26.21 26.21
26.21 26.21
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
LABO0270-004 07/01/2021
MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES Rates
Tunnel and Shaft Laborers:
GROUP 1 .............. , ..... . $ 42.00
GROUP 2 •••••...•..•••..•.••• $ 41. 77
GROUP 3 •• , •••.••.•.••• , •...• $ 41. 52
GROUP 4 ••••••••••••••••••••• $ 41.07
GROUP 5 ••••••••••••••••••••• $ 40.53
Shotcrete Specialist ••••.••. $ 42.52
TUNNEL AND SHAFT CLASSIFICATIONS
Fringes
25.71 25.71
25.71 25.71
25.71 25.71
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
LAB00270~005 07/01/2021
MONTEREY AND SAN BENITO COUNTIES
Rates
LABORER
Mason Tender-Brick ..•......• $ 34.09
LAB00270-007 06/25/2018
MONTEREY, SAN BENITO, AND SANTA CRUZ, COUNTIES
Fringes
24.41 Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B)
Construction Specialist
Group ....................... $ 30.40 23.20
GROUP 1 .•.........••..••...• $ 29.79 23.20
GROUP 1-a ...•.•••.••.•••..•• $ 30.01 23.20
GROUP 1-c ..•...•..••..•••.•• $ 29.84 23.20
GROUP 1-e ..•••.•.•.•.•.•..•• $ 30.34 23.20
GROUP 1-f .....••..•••.••..•• $ 30.37 23.20
GROUP 2 ••...•.•...•..••...•• $ 29.64 23.20
GROUP 3 ••.••...••.•.•.•....• $ 29.54 23.20
GROUP 4 •.••.•....•.•.••..••• $ 23.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA B)
(1) New Construction .••...•. $ 29.54
(2) Establishment Warranty
Period •••....••.••...••.••.. $ 23. 23
LABORER (GUNITE - AREA B)
GROUP 1 .•.•.•...•..••••..••• $ 29.75
GROUP 2 ..••..•.•.•.•.••••••• $ 29.25
GROUP 3 •..•.•...••••.••..••. $ 28.66
GROUP 4 •..••...•.•...••..••. $ 28.54
LABORER (WRECKING - AREA B)
GROUP 1 ...•.•••..•..•••..•.• $ 29. 79
GROUP 2 ••....••.••..•••••..• $ 29.64
FOOTNOTES:
23.20 23.20
22.31 22.31
22.31 22.31
23.20 23.20
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher• 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay"kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive$ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake}, grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups l through l-fj Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection'"'.
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
LAB00270-010 06/25/2018
SANTA CLARA COUNTY
Rates
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:}
Construction Specialist
Group •••.••.....•••••••••.•• $ 31.49
GROUP 1 .................... . $ 30. 79
GROUP 1-a ................ ... $ 31,01
GROUP 1-c ................. .. $ 30.84
Fringes
23.20 23.20
23.20 23.20
GROUP 1-e ...••...•........•. $ 31.34 23.20
GROUP 1-f ................... $ 30.37 23.20
GROUP 2 .•••.••..•......•..•• $ 30.64 23.20
GROUP 3 ••••••••••••••••••••• $ 30.54 23.20
GROUP 4 ..................... $ 24.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
{1) New Construction ..••.••• $ 30.54
(2) Establishment Warranty
Period ••••.••..•••••.•••..•• $ 24.23
LABORER (GUNITE - AREA A:)
GROUP 1 ••..•••.•.••.....•.•. $ 30.75
GROUP 2 ..................... $ 30.25
GROUP 3, ..••.•.•.•...••••.•• $ 29.66
GROUP 4 ••.•••...•.••.•.•..•. $ 29.54
LABORER (WRECKING - AREA A:)
GROUP 1 ..... , ............... $ 30. 79
GROUP 2 ..••.•..•.••.•.•••••. $ 30. 64
FOOTNOTES:
23.20 23.20
22.31 22.31
22.31 22.31
23.20 23.20
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2'"' or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive$ ,25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein, This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser {stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification '"'material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
LAB00270-011 07/01/2017
MONTEREY, SAN BENITO, SANTA CRUZ, SANTA CLARA COUNTIES
Rates
LABORER (Plaster Tender) ••.•.•.•• $ 34.70
Fringes
21.22 Work on a swing stage scaffold: $1.00 per hour additional.
LAB00294-001 07/01/2020
FRESNO, KINGS AND MADERA COUNTIES
Rates Fringes
LABORER (Brick)
Mason Tender-Brick .••.•..... $ 32.84
LAB00294-002 06/28/2021
FRESNO, KINGS, AND MADERA COUNTIES
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Rates
Escort Driver, Flag Person •. $ 33.48
Traffic Control Person I .••• $ 33.78
Traffic Control Person II ••• $ 31.28
23.71 Fringes
26.21 26.21
26.21 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
LAB00294·005 07/01/2021
FRESNO, KINGS, AND MADERA COUNTIES
Rates
Tunnel and Shaft Laborers:
GROUP 1 .•....•••.•••.•...••• $ 42.00
GROUP 2 .••....•.•••..••....• $ 41. 77
GROUP 3 .•••..••••••..•••.••• $ 41.52
GROUP 4 .................... . $ 41.07
GROUP 5 •.•• , ••.•.•..•••••.•. $ 40.53
Shotcrete Specialist .••.•••• $ 42.52
TUNNEL AND SHAFT CLASSIFICATIONS
Fringes
25.71 25.71
25.71 25.71
25.71 25.71
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen · where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
LAB00294•008 06/25/2018
FRESNO, KINGS, AND MADERA COUNTIES
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B:)
Construction Specialist
Rates Fringes
Group ..••..•...•.•...••..... $ 30.49 23.20
GROUP 1 ••..•••..•.•..••...•. $ 29.79 23.20
GROUP 1-a .•...•..••...••.••• $ 30.01 23.20
GROUP 1-c .•.••.•....••.•••.. $ 29.84 23.20
GROUP 1-e .•.•.••.••.••..••.• $ 30.34 23.20
GROUP 1-f ................... $ 30.37 23.20
GROUP 2 .•.•...•............• $ 29.64 23.20
GROUP 3 ..................... $ 29.54 23.20
GROUP 4 ..................... $ 23.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA 8:)
(1) New Construction ....••.. $ 29.54
(2) Establishment warranty
Period .•....••..•.....••..•. $ 23.23
LABORER (GUNITE - AREA B:)
GROUP 1 ..•........••.....•.• $ 29. 75
GROUP 2 ••••..•.••...•..••••• $ 29. 25
GROUP 3 ••...•••.•.....•••..• $ 28.66
GROUP 4 •..•.••.•...••..••.•• $ 28.54
LABORER (WRECKING - AREA B:)
GROUP 1 ..................... $ 29. 79
GROUP 2 .•.•••••.•••••••....• $ 29 .64
FOOTNOTES:
23.20 23.20
22.31 22.31
22.31 22.31
23.20 23.20
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackharmner operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal}; Asbestos and mold removal worker
GROUP 1-a; Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive$ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth,) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean~up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification '"'material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Patman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
LAB00294-010 07/01/2021
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN
JOAQUIN, STANISLAUS & TUOLUMNE
Rates
Plasterer tender ••.....••.••••..• $ 35.82
Fringes
28.45 Work on a swing stage scaffold: $1.00 per hour additional.
LAB00294-011 07/01/2021
FRESNO, KINGS, AND MADERA COUNTIES
Rates
LABORER (Plaster Tender) .••..•.•. $ 35.82
Fringes
28.45 Work on a swing stage scaffold: $1.00 per hour additional.
LAB00304-002 06/28/2021
ALAMEDA COUNTY
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Rates
Escort Driver, Flag Person •• $ 34.48
Traffic Control Person I •••• $ 34.78
Traffic control Person II ..• $ 32.28
Fringes
26.21 26.21
26.21 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
LAB00304-003 07/01/2021
ALAMEDA COUNTY
Tunnel and Shaft Laborers:
Rates
GROUP 1 ..................... $ 42.00
GROUP 2 •••..•...••.•..•••••. $ 41.77
GROUP 3 ••.•.•••.••.•..•••••• $ 41.52
GROUP 4 •.•••••••.•••.••••.•• $ 41.07
GROUP 5 .••••••••••••..•.••.• $ 40.53
Shotcrete Specialist .•.•.••• $ 42.52
TUNNEL AND SHAFT CLASSIFICATIONS
Fringes
25.71 25.71
25.71 25.71
25.71 25.71
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
LABO0304-004 06/25/2018
ALAMEDA COUNTY
LABORER (CONSTRUCTION CRAFT
LABORERS· AREA A:)
Construction Specialist
Rates Fringes
Group ••••••.••..•...•••...•• $ 31.49 23.20
GROUP 1 ••...•....•••••..•... $ 30. 79 23 . 20
GROUP 1-a •••••.••••.•••••..• $ 31.01 23.20
GROUP 1-c ................... $ 30.84 23.20
GROUP 1-e ................... $ 31.34 23.20
GROUP 1-f .•••..•••••...•.•.• $ 30.37 23.20
GROUP 2 ••.•.••.••••••••..•.. $ 30.64 23.20
GROUP 3 ••.•.•.•..••••••••.•• $ 30.54 23.20
GROUP 4 ..................... $ 24.23 23.20
see groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction ..•..•.• $ 30.54 23.20
(2) Establishment Warranty
Period ••••...•..•...•.....•• $ 24.23 23.20
LABORER (GUNITE - AREA A:)
GROUP 1 .•.•......•..•......• $ 30.75 22.31
GROUP 2 ••.••••••••••••.•••.• $ 30.25 22.31
GROUP 3 .••.•.•.••••.•..••..• $ 29.66 22.31
GROUP 4 ..................... $ 29.54 22.31
LABORER (WRECKING - AREA A:)
GROUP 1 ....•••.............. $ 30.79 23.20
GROUP 2 ..................... $ 30.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP l: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (l-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer {including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe testerj Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2Aj Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group l wage rates. ""Sewer cleaner'"' means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group l wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive$ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
LAB00304-005 05/01/2018
ALAMEDA COUNTY
Rates
Brick Tender •......•..•••.......• $ 35.37
Fringes
20.70 FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional.
LAB00304-008 07/01/2017
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates
Plasterer tender .•.•••••••••••••• $ 34.70
Fringes
23.11 Work on a swing stage scaffold: $1.00 per hour additional.
LAB00324-002 06/28/2021
CONTRA COSTA COUNTY
Rates
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person •• $ 34.48
Traffic Control Person I .••• $ 34.78
Traffic Control Person II ... $ 32.28
Fringes
26.21 26.21
26.21 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
LAB00324-006 06/25/2018
CONTRA COSTA COUNTY
Tunnel and Shaft Laborers:
Rates
GROUP 1 .............•...•..• $ 37 .82
GROUP 2 ••..•.••.••••.••••••• $ 37. 59
GROUP 3 ••...•••....•.••.•••• $ 37.34
GROUP 4 ••.•••.••••...•••...• $ 36.89
GROUP 5 .•••••.••••••..•••••• $ 36.35
Shotcrete Specialist .•.•••.• $ 38.34
Fringes
24.11 24.11
24.11 24.11
24.11 24.11
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); lugger {for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Oumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
LAB00324-012 06/25/2018
CONTRA COSTA COUNTY
LABORER {CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Rates Fringes
Group .....•••...••.•.••..•.. $ 31.49 23.20
GROUP 1 .•..••.....•..••..••. $ 30.79 23.20
GROUP 1-a ...••.•.•••.•...•.• $ 31.01 23.20
GROUP 1-c ................... $ 30.84 23.20
GROUP 1-e ..•••...••.••...•.• $ 31.34 23.20
GROUP 1-f .••••.•.••.•••.•••• $ 30.37 23.20
GROUP 1-g ..••••••..••••••.•• $ 30.99 23.20
GROUP 2 ••••.•...••.••••..•.• $ 30.64 23.20
GROUP 3 ..................... $ 30.54 23.20
GROUP 4 ..................... $ 24.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction •••.•... $ 30.54
(2) Establishment Warranty
Period •••..••....•.••••..•.• $ 24. 23
LABORER (GUNITE - AREA A:)
GROUP 1 ••••.•.•.•••.•..••..• $ 30.75
GROUP 2 ••....•.••...••..••.. $ 30.25
GROUP 3 •••..••••••...•••••.• $ 29.66
GROUP 4 ••...•••••.••........ $ 29.54
LABORER (WRECKING - AREA A:)
GROUP 1 •.••••••••••.•.•.••.• $ 30.79
GROUP 2 ••..•.••••.•.•..•.•.• $ 30.64
FOOTNOTES:
23.20 23.20
22.31 22.31
22.31 22.31
23.20 23.20
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP; Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes {all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-112•" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive$ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer {wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only}. The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of '"'form stripping, cleaning and oiling and moving to the next point of erection"".
GUNITE LABORER CLASSIFICATIONS
GROUP l: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi"skilled wrecker (salvaging of other building materials)
GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters
LAB00324-014 05/01/2018
CONTRA COSTA COUNTY:
Rates
Brick Tender .••......••.••..••.•• $ 35.37
Fringes
20,70
FOOTNOTES: Work on jobs where heat-protective clothing is required: $2,00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional.
LABO0324"018 07/01/2021
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates
Plasterer tender ........•.......• $ 38.28
Fringes
29.43 Work on a swing stage scaffold: $1.00 per hour additional.
LAB01130-002 06/28/2021
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Rates
Escort Driver, Flag Person .. $ 33.48
Traffic Control Person I •... $ 33.78
Traffic Control Person II ••• $ 31.28
Fringes
26.21 26.21
26.21 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
LAB01130-003 06/26/2017
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1 ...................•. $ 36.60
GROUP 2 ••••••••••••••••••••• $ 36.37
GROUP 3 ...•...•••.•...•...•. $ 36.12
GROUP 4 •••••• , •••••••.•••••• $ 35.67
GROUP 5 ••.••..•...••.•.•..•. $ 35.13
Shotcrete Specialist ..•...•• $ 37.12
TUNNEL AND SHAFT CLASSIFICATIONS
24.83 24.83
24.83 24.83
24.83 24.83
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP s: Grout crew; Reboundman; Swamper/ Brakeman
LABO1130-005 07/01/2018
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
LABORER
Mason Tender-Brick •...•..... $ 31.20
LAB01130-007 06/25/2018
22.20 MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE, COUNTIES
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B:)
Construction Specialist
Rates Fringes
Group ••••••••.••••..•••...•. $ 30.49 23.20
GROUP 1 ..................... $ 29. 79 23.20
GROUP 1-a ..•..•.••..•.••...• $ 30.01 23.20
GROUP 1-c ................... $ 29.84 23.20
GROUP 1-e ••••..•••••..••.••• $ 30.34 23.20
GROUP 1-f •.•...•••...••...•• $ 29.37 23.20
GROUP 2 ..................... $ 29.64 23.20
GROUP 3 •...••••••••••••••••• $ 29.54 23.20
GROUP 4 •...••..•.••••.•••.•• $ 23.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA B:)
(1) New Construction •••••••• $ 29.54
(2) Establishment Warranty
Period •.•.•.•.•••..•...••... $ 23. 23
LABORER (GUNITE - AREA B:)
GROUP 1 ...•.••.•..•••.•...•• $ 29. 75
GROUP 2 ..................... $ 29.25
GROUP 3 ••••••••••••••••••••• $ 28.66
GROUP 4 •••.•.•...••••.•••.•. $ 28.54
LABORER (WRECKING - AREA B:)
GROUP 1 .•.••.•••.•.••......• $ 29. 79
GROUP 2 ••.....••...•.••••••• $ 29.64
FOOTNOTES:
23.20 23.20
22.31 22.31
22.31 22.31
23.20 23.20
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; auggymobile; caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2'"' or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. "ffSewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive$ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only}; material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
c: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
GUNITE LABORER CLASSIFICATIONS
GROUP l: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
WRECKING WORK LABORER CLASSIFICATIONS
GROUP l: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
LABO1130-008 07/01/2021
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN
JOAQUIN, STANISLAUS & TUOLUMNE
Rates
Plasterer tender ..••.••...••..•.. $ 35.82
Fringes
28.45 Work on a swing stage scaffold: $1.00 per hour additional.
LAB01130-009 07/01/2021
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
LABORER (Plaster Tender) •••••...• $ 35.82 28.45
Work on a swing stage scaffold: $1.00 per hour additional.
PAIN0016-001 01/01/2021
ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN MATEO, SANTA
CLARA, AND SANTA CRUZ COUNTIES
Rates
Painters: ••.•••.••.•.•.•..•.••••• $ 45.22
PREMIUMS:
EXOTIC MATERIALS - $1.25 additional per hour.
SPRAY WORK: - $0.50 additional per hour.
INDUSTRIAL PAINTING - $0.25 additional per hour
Fringes
25.48 [Work on industrial buildings used for the manufacture and processing of goods for sale or service; steel construction (bridges), stacks, towers, tanks, and similar structures] HIGH WORK:
over 50 feet - $2.00 per hour additional
100 to 180 feet - $4.00 per hour additional
Over 180 feet - $6.00 per houir additional
PAIN0016·003 07/01/2021
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: CALAVERAS, MARIPOA, MERCED, MONTEREY, SAN BENITO, SAN
JOAQUIN, SANTA CRUZ, STANISLAUS & TUOLUMNE COUNTIES
Rates
Drywall Finisher/Taper
AREA l ..................... . $ 54.91
AREA 2 ..••..•....•.•.•...•.• $ 50.78
PAIN0016-012 01/01/2019
Fringes
29.49 28.09
ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO,
SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES Rates
SOFT FLOOR LAYER .••.••••••••••••• $ 48.60
PAIN0016-015 01/01/2021
Fringes
27.43 CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE
COUNTIES
Rates
PAINTER
Brush ••..•..•..•••.••.••.•.. $ 35.88
FOOTNOTES:
SPRAY/SANDBLAST: $0.50 additional per hour.
EXOTIC MATERIALS: $1.25 additional per hour.
Fringes
21.16 HIGH TIME: Over 50 ft above ground or water level $2.00 additional per hour. 100 to 180 ft above ground or water level $4.00 additional per hour. over 180 ft above ground or water level $6.00 additional per hour.
PAIN0016-022 01/01/2021
SAN FRANCISCO COUNTY
Rates
PAINTER ••.••••••••..•.•.••••••••• $ 48.84
PAIN0169-001 06/01/2020
Fringes
25.48 FRESNO, KINGS, MADERA, MARIPOSA AND MERCED COUNTIES:
Rates
GLAZIER •••.•••..•••.••••••••••••• $ 40.00
* PAIN0169-005 01/01/2022
Fringes
26.76 ALAMEDA CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN
MATEO, SANTA CLARA & SANTA CRUZ COUNTIES
Rates
GLAZIER .•••.•••••••••......••.••• $ 54. 77
PAIN0294-004 01/01/2021
FRESNO, KINGS AND MADERA COUNTIES
Rates
PAINTER
Brush, Roller ..•....•.••.••. $ 31.36
Drywall Finisher/Taper ••.••• $ 40.10
FOOTNOTE:
Fringes
31.45 Fringes
20.33 25.00
Spray Painters & Paperhangers recive $1.00 additional per hour. Painters doing Drywall Patching receive $1.25
additional per hour. Lead Abaters & Sandblasters receive $1.50 additional per hour. High Time - over 30 feet (does not include work from a lift) $0.75 per hour additional.
PAIN0294-005 01/01/2021
FRESNO, KINGS & MADERA
Rates
SOFT FLOOR LAYER .••.••••••••.••.• $ 34.55
* PAIN0767-001 01/01/2022
Fringes
21.67 CALAVERAS, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
Rates
GLAZIER •.••.••••..•.•••.•.••.••.• $ 41. 78
Fringes
33.09 PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr. Day, President's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and Christmas Day.
Employee rquired to wear a body harness shall receive $1.50 per hour above the basic hourly rate at any elevation.
PAIN1176-001 07/01/2021
HIGHWAY IMPR0VEMENT
Parking Lot Striping/Highway
Marking:
Rates
GROUP 1 •.•.....•.••..•.•...• $ 39.48
GROUP 2 •.....•.••..••..•.•.• $ 33.56
GROUP 3 •••.•....••.•.•.•.•.• $ 33 .95
CLASSIFICATIONS
Fringes
16.98 16.98
16.98 GROUP 1: Striper: Layout and application of painted traffic stripes and marking; hot thermo plastic; tape, traffic
stripes and markings
GROUP 2: Gamecourt & Playground Installer
GROUP 3: Protective Coating, Pavement Sealing
PAIN1237-003 01/01/2021
CALAVERAS; SAN JOAQUIN COUNTIES; STANISLAUS AND TUOLUMNE COUNTIES:
Rates
SOFT FLOOR LAYER •••••••••••..•.•• $ 41.81
PLAS0066-002 07/01/2019
Fringes
23.39 ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN FRANCISCO COUNTIES:
Rates
PLASTERER ••..•.•••.••..•.••••..•• $ 42.41
PLAS0300-001 07/01/2018
Rates
PLASTERER
AREA 188: Fresno ••••••••••• $ 32.70
AREA 224: San Benito,
Santa Clara, Santa Cruz ..... $ 32.88
AREA 295: Calaveras & San
Joaquin Couonties •....•...•. $ 32.70
AREA 337: Monterey County .. $ 32.88
AREA 429: Mariposa,
Merced, Stanislaus,
Tuolumne Counties •...•..••.• $ 32.70
PLAS0300-005 07/01/2016
Rates
CEMENT MASON/CONCRETE FINISHER •.• $ 32.15
PLUM0038-001 07/01/2021
SAN FRANCISCO COUNTY
Rates
PLUMBER (Plumber,
Steamfitter, Refrigeration
Fitter) .••..•••.••..••..•.•..•..• $ 79.00
PLUM0038-005 07/01/2021
SAN FRANCISCO COUNTY
Rates
Landscape/Irrigation Fitter
(Underground/Utility Fitter) •••.• $ 67.15
PLUM0062-001 01/01/2022
MONTEREY AND SANTA CRUZ COUNTIES
Rates
PLUMBER & STEAMFITTER •..•.••.•••• $ 47.85
PLUM0159-001 07/01/2019
CONTRA COSTA COUNTY
Rates
Plumber and steamfitter
(1) Refrigeration •.•••••..•• $ 56.93
(2) All other work •...••..•• $ 57.82
PLUM0246-001 01/01/2022
FRESNO, KINGS & MADERA COUNTIES
Fringes
30.73 Fringes
31,68
31.68 31.68
31.68 31.68
Fringes
23.27 Fringes
46.01 Fringes
32.67 Fringes
38.10 Fringes
41.04 41.04
Rates
PLUMBER & STEAMFITTER ..•..•..•.•• $ 45.15
* PLUM0246-004 01/01/2017
FRESNO, MERCED & SAN JOAQUIN COUNIES
Rates
PLUMBER (PIPE TRADESMAN) .•.•••.•• $ 13.00 **
PIPE TRADESMAN SCOPE OF WORK:
Fringes
37,19
Fringes
10.74 Installation of corrugated metal piping for drainage, as well as installation of corrugated metal piping for culverts in connection with storm sewers and drains; Grouting, dry
packing and diapering of joints, holes or chases including paving over joints, in piping; Temporary piping for dirt work for building site preparation; Operating jack hammers, pavement breakers, chipping guns, concrete saws and spades to cut holes, chases and channels for piping systems;
Digging, grading, backfilling and ground preparation for all types of pipe to all points of the jobsite; Ground
preparation including ground leveling, layout and planting of shrubbery, trees and ground cover, including watering, mowing, edging, pruning and fertilizing, the breaking of concrete, digging, backfilling and tamping for the
preparation and completion of all work in connection with lawn sprinkler and landscaping; Loading, unloading and
distributing materials at jobsite; Putting away materials in storage bins in jobsite secure storage area; Demolition of piping and fixtures for remodeling and additions;
Setting up and tearing down work benches, ladders and job shacks; Clean-up and sweeping of jobsite; Pipe wrapping and waterproofing where tar or similar material is applied for protection of buried piping; Flagman
PLUM0342-001 07/01/2021
ALAMEDA & CONTRA COSTA COUNTIES
Rates
PIPE FITTER
CONTRA COSTA COUNTY ...•..... $ 69.95
PLUMBER, PIPEFITTER,
STEAMFITTER
ALAMEDA COUNTY .............. $ 69.95
PLUM0355-004 07/01/2021
Fringes
44.00 44.00
ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA,
MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, AND TUOLUMNE COUNTIES:
Rates
Underground Utility Worker
/Landscape Fitter ..........• $ 30.90
PLUM0393-001 07/01/2021
Fringes
16.80 SAN BENITO AND SANTA CLARA COUNTIES
Rates
PLUMBER/PIPEFITTER •.••.•....•..•• $ 68.76
PLUM0442-001 01/01/2022
Fringes
46.63 CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE
COUNTIES
Rates
PLUMBER & STEAMFITTER .....•.•..•• $ 48.75
PLUM0467-001 07/01/2021
SAN MATEO COUNTY
Rates
Plumber/Pipefitter/Steamfitter ••• $ 73.10
ROOF0027-002 01/01/2022
FRESNO, KINGS, AND MADERA COUNTIES
Rates
ROOFER ...•..•.•••.••.••......••• , $ 38. 81
Fringes
33.94 Fringes
38.61 Fringes
14.81 FOOTNOTE: Work with pitch, pitch base of pitch impregnated products or any material containing coal tar pitch, on any building old or new, where both asphalt and pitchers are used in the application of a built-up roof or tear off:
$2.00 per hour additional.
ROOF0040-002 08/01/2021
SAN FRANCISCO & SAN MATEO COUNTIES:
Rates
ROOFER ..••..•••..•.•..•.•.•••••.• $ 46.38
ROOF0081-001 08/01/2021
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates
Roofer ..••..••••••....•.•.•••.••• $ 47,17
ROOF0081-004 08/01/2020
Fringes
20.94 Fringes
19.86 CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
Rates
ROOFER ..•••.•....••.•...•....•.•• $ 39. 73
Fringes
19.11 ROOF0095-002 08/01/2020
MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES:
Rates
ROOFER
Journeyman •••.•..•••.••..••. $ 46.54
Kettle person (2 kettles);
Bitumastic, Enameler, Coal
Tar, Pitch and Mastic
worker •...•......•••.••..••• $ 48.54
SFCA0483-001 01/01/2022
Fringes
20.69 20.69
ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES:
Rates
SPRINKLER FITTER (FIRE) •.•.•••.•• $ 70.55
* SFCA0669-011 04/01/2022
Fringes
35.39 CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY,
SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE COUNTIES:
Rates
SPRINKLER FITTER •.••.••...•.••••• $ 42.30
SHEE0104-001 07/01/2020
Fringes
26.69 AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA
AREA 2: MONTEREY & SAN BENITO
AREA 3: SANTA CRUZ
Rates
SHEET METAL WORKER
AREA 1:
Mechanical Contracts
under $200,000 .•..•••.••... $ 55.92
All Other Work •••••••••.••• $ 64.06
AREA 2 •••••••••••••••••••••• $ 52.90
AREA 3 ...............••.•.•. $ 55 .16
SHEE0104-003 07/01/2021
CALAVERAS AND SAN JOAQUIN COUNTIES:
Rates
SHEET METAL WORKER ......•...•.... $ 44.34
SHEE0104-005 07/01/2021
Fringes
45.29 46.83
36.44 34.18
Fringes
39.22 MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES:
Rates
SHEET METAL WORKER (Excluding
metal deck and siding} ..•.....••• $ 41.28
SHEE0104-007 07/01/2021
FRESNO, KINGS, AND MADERA COUNTIES:
Rates
SHEET METAL WORKER ..•••.•..••••.• $ 44.07
SHEE0104-015 07/01/2020
Fringes
45.41 Fringes
40.79 ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES:
Rates Fringes
SHEET METAL WORKER (Metal
Decking and Siding only) •.••.•.•• $ 44.45 35.55
SHEE0104-018 07/01/2020
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
Rates
Sheet metal worker (Metal
decking and siding only) .•..•••.• $ 44.45
TEAM0094-001 07/01/2021
Rates
Truck drivers:
GROUP 1 •..•••...••••••..••.• $ 35.15
GROUP 2 •••••...•••.•.•.••••. $ 35.45
GROUP 3 •••••••.••••••.•...•• $ 35. 75
GROUP 4 ..................... $ 36.10
GROUP 5 .•...••••••••..•••••• $ 36.45
FOOTNOTES:
Fringes
35.55 Fringes
31.42 31.42
31.42 31.42
31.42 Articulated dump truck; Bulk cement spreader (with or without auger); Dumpcrete truck; Skid truck (debris box); Dry
pre-batch concrete mix trucks; Dumpster or similar type; Slurry truck: Use dump truck yardage rate.
Heater planer; Asphalt burner; Scarifier burner; Industrial lift truck (mechanical tailgate); Utility and clean-up
truck: Use appropriate rate for the power unit or the
equipment utilized.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Dump trucks, under 6 yds.; Single unit flat rack (2- axle unit); Nipper truck (when flat rack truck is used
appropriate flat rack shall apply); Concrete pump truck (when flat rack truck is used appropriate flat rack shall apply}; Concrete pump machine; Fork lift and lift jitneys; Fuel and/or grease truck driver or fuel person; Snow buggy; Steam cleaning; Bus or personhaul driver; Escort or pilot car driver; Pickup truck; Teamster oiler/greaser and/or serviceperson; Hook tender (including loading and
unloading}; Team driver; Tool room attendant (refineries) GROUP 2: Dump trucks, 6 yds. and under 8 yds.; Transit
mixers, through 10 yds.; Water trucks, under 7,000 gals.; Jetting trucks, under 7,000 gals.; Single-unit flat rack (3-axle unit); Highbed heavy duty transport; Scissor truck; Rubber-tired muck car (not self-loaded); Rubber-tired truck jumbo; Winch truck and ""A"" frame drivers; Combination winch truck with hoist; Road oil truck or bootperson;
Buggymobile; Ross, Hyster and similar straddle carriers; Small rubber-tired tractor
GROUP 3: Dump trucks, 8 yds. and including 24 yds.; Transit mixers, over 10 yds.; Water trucks, 7,000 gals. and over; Jetting trucks, 7,000 gals. and over; Vacuum trucks under 7500 gals. Trucks towing tilt bed or flat bed pull
trailers; Lowbed heavy duty transport; Heavy duty transport tiller person; Self- propelled street sweeper with
self-contained refuse bin; Boom truck - hydro-lift or
Swedish type extension or retracting crane; P.B. or similar type self-loading truck; Tire repairperson; Combination bootperson and road oiler; Dry distribution truck (A
bootperson when employed on such equipment, shall receive the rate specified for the classification of road oil
trucks or bootperson); Ammonia nitrate distributor, driver and mixer; Snow Go and/or plow
GROUP 4: Dump trucks, over 25 yds. and under 65 yds.; Water pulls - DW 10's, 20's, 21's and other similar equipment when pulling Aqua/pak or water tank trailers; Helicopter pilots (when transporting men and materials); Lowbedk Heavy Duty Transport up to including 7 axlesj DW10's, 20's, 2l's and other similar cat type, Terra Cobra, LeTourneau Pulls, Tournorocker, Euclid and similar type equipment when
pulling fuel and/or grease tank trailers or other
miscellaneous trailers; Vacuum Trucks 7500 gals and over and truck repairman
GROUP 5: Dump trucks, 65 yds. and over; Holland hauler; Low bed Heavy Duty Transport over 7 axles
WELDERS~ Receive rate prescribed for craft performing
operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.00) or 13658 ($11.25). Please see the Note at the top of the wage
determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at
https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this
classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU'"' identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those
classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling on survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3,) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"