RESOLUTION NO. 2022-
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF MERCED, CALIFORNIA, ADOPTING A
LIST OF PROJECTS FOR FISCAL YEAR 2022-2023
FUNDED BY SB 1: THE ROAD REPAIR AND
ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act mo law by ahe Cover in April 21 o ares he significant mut modad transportation funding shortfalls statewide;
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Merced are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year,
WHEREAS, the City of Merced must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; WHEREAS, the City of Merced, will receive an estimated $2,073,653 in RMRA funding in Fiscal Year 2022-23 from SB 1;
WHEREAS, this is the sixth year in which the City of Merced is receiving SB 1 funding and will enable the City of Merced to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; WHEREAS, the City of Merced has undergone a robust public process to ensure public input into our community's transportation priorities/the project list; X: \Resolutions\2022 EnginceringlApproving SB1 Funding.docx 1 WHEREAS, the City of Merced used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high- priority and cost-effective projects that also meet the community's priorities for transportation investment;
WHEREAS, the funding from SB 1 will help the City of Merced maintain and rehabilitate 9 streets, 2 sidewalk infill projects, 1 Pedestrian Bridge repair project, and 3 vehicle and pedestrian safety improvements at railroad crossings projects throughout the City of Merced this year and many similar projects into the future;
WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment found that the City of Merced's streets and roads are in an at-risk or poor condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into an "excellent/good" condition; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive benefits in the City of Merced.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MERCED
DOES HEREBY RESOLVE, DETERMINE, FIND, AND ORDER AS
FOLLOWS:
SECTION 1. The foregoing recitals are true and correct.
SECTION 2. The following list of newly proposed projects will be funded in-part or solely with Fiscal Year 2022-23 Road Maintenance and Rehabilitation Account revenues:
X:\Resolutions\2022\Engineering\Approving SB1 Funding.docx 2 NEW PROJECTS
SAFETY PROJECTS
Proposed Schedule Proposed Estimated
Location Approximate Estimated Cost (Pre-Construction) Schedule Useful Life Quantity
Construction
R Street Quiet Zone LS 160,000 12/22-5/23 /22-12/2 10 - 20 years U Street Quiet Zone LS 120,000 12/22-5/23 7/22-12/23 10 - 20 years Bear Creek Quiet Zone LS 150,000 12/22-5/23 7122-12124 10 - 20 years Santa Fe Strip Park Speed Table LS 150,000 12/22-5/23 7/22-12/25 Bear Creek Pedestrian Bridge LS 75,000 N/A 7122-12126
Sidewalk infill LO 205,554 12122-5/23 7/22-12/27 10-20 years M Street Eucalyptus Bike Path Repair IS $ 150,000 12/22-5/23 7/22-12/28 Total Estimated Cost: L$ 1,010,554||
Road Improvement/Reconstruction Projects
Approximate Proposed
Estimated Cost roposed Schedu Schedule Estimated
Location Pre-Constructio Iseful Lif
(Lingar fi 2,500,000 1/22 - 10/22 20-25 years
[Yosemite Ave (Parsons to Mansionette)
Total Estimated Cost: 5 2,500,000
Road Maintenance & Rehabilitation Progams and Material Purchase Proposed
Approximate Schedule
Location Quantity Estimated Cost
Various Locations throughout City (SB 1) $ 412,038 5-7 years Total Estimated Cost: LS 412,038
SECTION 3. The following previously proposed and adopted projects may also utilize Fiscal Year 2022-23 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City of Merced is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues:
X:\Resolutions\2022\Engineering\Approving SB1 Funding.docx 3 CARRY-OVER PROJECTS
SAFETY PROJECTS
Proposed Schedule Proposed Estimated
Location Approximate Estimated Cost Schedule
Quantity (Pre-Construction) Useful Life
(Construction
raffic Signal Timing 100,000 12/21 - 12122 12/22 - 212: 10 - 20 years anta Fe Strip Park Sidewalk Replacemen 225,000 1/22 - 5/22 5/22 - 10/22 10-20 year Street Sidewalk Replacement (Childs to 13th 150,000 1/22 - 5/22 5/22 - 10/22 10 - 20 years oop Replacement FY202 94,000 1/22 - 5/22 5/22 - 10/22 | 10 - 20 years 569,000
pro mate on Roconstruction Propose Proposed
Estimated Cost roposed Schedul Schedule Estimated
Location Quantity Pre-Construction Useful Life
(Linear ff) (Construction)
18th Street (R St to V St) 1,920 $ 1,000,000 1/22 - 5/22 5/22 - 10/22 20 - 25 years R Street (Olive Ave to Northwood Dr) 1,130 $ 1,000,000 1/22 - 5/22 5/22 - 10/22 20-25 years Cris Ve arons to Campus anay - 3.360 I$ 2,500,000 1/22 - 10/22 10/22 - 5/23 20-35 years 6,900 $ 492,800 Vot Planned
** Grant funds needed Estimated Cost: $ 4,992,800
PROJECTS PENDING FINAL CLOSEOUT/COMPLETION
Proposed Schedule Proposed
Description/Location Approximate Estimated Cost Schedule Estimater Quantity (Pre-Construction) Iseful Lif
Grind & Overlay - M Street (Phase 2) 1,940 LF 650,000 5/20 - 7120 8020-12101 8-12 years Concrete Light Pole Replacement 50,000 N/A 6/21 - 10/21 15 - 20 years Total Estimato Cost L8 700,000
regular meeting held on the _ 2022, by the following
vote:
AYES: Council Members:
NOES: Council Members:
ABSENT: Council Members:
ABSTAIN: Council Members:
X: Resolutions|2022VEngineering\Approving SB1 Funding.docx 4 APPROVED:
Mayor
ATTEST:
STEPHANIE R. DIETZ, CITY CLERK
BY:
Assistant/Deputy City Clerk
(SEAL)
APPROVED AS TO FORM:
5/5/2022
City Attorney Date
X: \Resolutions\2022VEngineering\Approving SBI Funding.doex 5