City of Merced
Project #122069
Laura Fountain Repair
Bid Opening 5/31/22

UNIT OF ESTIMATED UNIT ITEM

MEASURE QUANTITY PRICE TOTAL
Schedule A
1 Permits, Bonds, Licenses & Insurance LS 1 3,600.00$ 3,600.00$ 2 Public Convenience and Safety LS 1 3,500.00$ 3,500.00$ 3 Water Pollution Control LS 1 1,500.00$ 1,500.00$ 4 Remove Concrete SF 3429 4.17$ 14,298.93$ 5 Remove Fountain LS 1 23,500.00$ 23,500.00$
6 Remove Plumbing LS 1 3,500.00$ 3,500.00$
7 Remove Electrical LS 1 3,500.00$ 3,500.00$
8 Remove Metal Vault EA 1 1,400.00$ 1,400.00$
9 Remove and Replace Wrought Iron Fence LF 40 25.00$ 1,000.00$ 10 Remove Plaque EA 1 250.00$ 250.00$
11 4" Concrete SF 1,880 16.25$ 30,550.00$ 12 Install Fountain LS 1 21,500.00$ 21,500.00$
13 Place Fountain Walls LS 1 12,500.00$ 12,500.00$ 14 New Fountain Gunite SF 1,430 7.30$ 10,439.00$ 15 New Fountain Concrete YD 45 550.00$ 24,750.00$ 16 Native Natural Rock LS 1 12,500.00$ 12,500.00$ 17 New Stand with Plaque LS 1 650.00$ 650.00$ 18 Pump and Filtration Sytem LS 1 9,500.00$ 9,500.00$ 19 Restoration LS 1 3,000.00$ 3,000.00$
TOTAL BASE BID SCHEDULE “A” ITEMS 1 THROUGH 19 181,437.93$

BID ALTTERNATES
1 Restoration of Fountain LS 1 11,800.00$ 11,800.00$ 2 New Fountain Granite Columns EA 4 1,050.00$ 4,200.00$ 3 New Fountain Ornament LS 1 3,574.00$ 3,574.00$ TOTAL BID SCHEDULE “B” ITEMS 1 THROUGH 3 19,574.00$
CONSTRUCTION COST 201,011.93$
NO. ITEM
Solitude Lake Management, LLC
dba Aquatic Environments
Benicia, CA