AMENDMENT MODIFICATION SUMMARY - (E-76)
FEDERAL AID PROGRAM CALIFORNIA DEPARTMENT OF TRANSPORTATION DLA LOCATOR: 10-MER-O-MER PROJECT LOCATION:
PREFIX: CML IN MERCED ON MOTEL DRIVE BETWEEN CAROL AVENUE AND MERCED AVENUE SEO NOT NO: 50651049) TYPE OF WORK:
SEQ NO: CONSTRUCT PEDESTRIAN/BIKE IMPROVEMENTS PREV AUTH / AGREE DATES:
STATE PROJ NO: 1018000225L-N FED RR NO'S:
ALT. PROJ NO: RAW:
AGENCY: MERCED PROJ OVERSIGHT: ASSUMED/LOCAL ADMIN CON:
ROUTE: ENV STATUS / DT: SPR:
DISASTER NO: RW STATUS / DT: 1 07/27/2021 MCS:
IIP DATA INV RTE: OTH:
MPO: MCAG
ESTIP YR: 21/22 END MP: PROJECT END DATE (PED): 11/30/2024 STIP REF 205-0000-0263 BRIDGE NO:
FSTIP ID NO: CMAQ17-5
PROG CODE LINE NO IMPV TYPE FUNG SYS URBAN AREA URB/RURAL DEMO ID Y003 30 28
Z003 15
FUNDING SUMMARY
PHASE PROJECT COST FEDERAL COST AC COST
PE PREV. OBLIGATION $60,978.00 $53,983.00 $0.00
PE PE THIS REQUEST $0.00 $0.00 $0.00
PE SUBTOTAL $60,978.00 $53,983.00 $0.00
RW PREV. OBLIGATION $0.00 $0.00 $0.00
RW THIS REQUEST $0.00 $0.00 $0.00
RW SUBTOTAL $0.00 $0.00 $0.00
CON PREV. OBLIGATION $0.00 $0.00 $0.00
CON CON THIS REQUEST $828,249.00 $508,347.00 $0.00
CON SUBTOTAL $828,249.00 $508,347.00 $0.00
OTH PREV. OBLIGATION $0.00 $0.00 $0.00
OTH OTH THIS REQUEST $0.00 $0.00 $0.00
OTH SUBTOTAL $0.00 $0.00 $0.00
TOTAL: $889,227.00 $562,330.00 $0.00
STATE REMARKS
0424/2018 SEC CAring (5S P83 2003) as l9 sum propriation. Ends are boring advancer rom 13 federal MAi EPS.
SEQ 1 - Authorizing PE ($53,983 Z003) as lump sum appropriation. Funds are being advanced from 18/19 to 17/18 via EPSP. CMAQ Emission Reduction (Ib/yr): ROG - 21.59; NOx - 25.18; PM2.5 - 5.10; PM10.
SEa 2Requedeini Requesting to uplato the PED from 6/1821 10 6118/23. No change in funding being requested 07/12/2022
FEDERAL REMARKS
AUTHORIZATION
AUTHORIZATION TO PROCEED WITH REQUEST: CON PREPARED IN FADS BY: NORIEGA, JASMINE ON 2022-08-04 948-3755 FOR: CON AUTHORIZATION REVIEWED IN FADS BY: NGUYEN, QUANG ON 2022-08-11 653-6230 DOCUMENT TYPE: AMOD SUBMITTED IN FADS BY: WULFF, DARLENE ON 2022-08-17 FOR CALTRANS PROCESSED IN FADS BY: SIGNATURE, NOT_REQUIRED ON 2022-08-17 FOR FHWA E-76 AUTHORIZED DATE IN FMIS BY: ROBBIE SCOTT ON 2022-08-22 19:00:03.0 SIGNATURE HISTORY FOR PROJECT NUMBER 5085(049) AS OF 08/29/2022
FHWA MIS SIGNATURE HISTORY
MOD # SIGNED BY SIGNED ON
SHUN HUEY 08/18/2022
SHUN HUEY 08/18/2022
ROBBIE SCOTT 08/22/2022
1 SHUN HUEY 05/13/2021
SHUN HUEY 05/13/2021
PAMELA ANGELO 05/17/2021
SHUN HUEY 04/25/2018
KEATON BROWDER 04/25/2018
JESSICA GORDON 04/26/2018
FHWA FMIS 3.0 SIGNATURE HISTORY
CALTRANS SIGNATURE HISTORY
DOCUMENT TYPE SIGNED BY SIGNED ON
AMEND/MOD WULFF, DARLENE 08/17/2022