CITY OF MERCED PROJECT NO. 117039
CHANGE ORDER NO. 2
DATE: 8/10/2022
PROJECT NAME: G Street Improvements Childs Ave to 13h St PROJECT LOCATION: Merced, California
CONTRACTOR: Rolfe Construction
ADDRESS: 3573 Southern Pacific Ave, Atwater, CA 95301
REASON FOR CHANGE ORDER: Additional scope of work being added to project. Storm sewer to possibly be extended on G St to remove "bubble up" curb and gutter inlets. Potholing required to verify alignment.

THE NUMBER OF WORKING DAYS WILL BE ADJUSTED AS FOLLOWS: None SKETCH / BACKUP ATTACHED: Yes
DESCRIPTION OF CHANGE:

No. Description Unit Unit Price Qty. Total

1. Labor-3 Persons/ 2 Days LS $4,992.00 1 $4,992.00

2. Equipment-Compressor, Jackhammer, Truck & Vac Trailer LS $2,200.00 1 $2,200.00

3. Material LS $200.00 1 $200.00

4. Traffic Control LS $1,000.00 1 $1,000.00
Total added cost for Schedule "A" on change order 1: 8,392.00 / ORIGINAL CONTRACT AMOUNT: $ 2,531,371.00
CHANGE ORDER #1 AMOUNT: -(98,500.00) 301837 PO# 144069
CHANGE ORDER #2 AMOUNT: 8,392.00 FUNDS/ACCOUNTS VERIFIED:

TOTAL PROJECT COST TO DATE: 2,441,263.00 450-1104-637.65-00-117039 (100%) $8,392.00 Total: $ 8,392.00
9/8/22
DATE
Funds available
ACCEPTED Jorge . Avela DATE 8/10/22

OLFE CONSTRUCTION INC-JORGE AVELAR-PN
DATE 08/11/2022

RECOMMENDED
(CITY ENGINEER
RECOMMENDED DATE 7-12-22
(PROTECT CHAMPION)
APPROVED DATE B18
(CITY ATTORNEY)
91222
DATE 9
AUTHORIZED phanie lut
688
TESTED Alejandra Mora DATE 913 RPOR
• (ASSISTANT/DEPUTY CITY CLERK

← All documents from this meeting