CITY OF MERCED
PLANNING & PERMITTING DIVISION
TYPE OF PROPOSAL: Zone Change #431 and Tentative Subdivision Map #1323 INITIAL STUDY: #22-32
DATE RECEIVED: December 7, 2022 (date application determined to be complete) LOCATION: 385 S. Coffee Street
ASSESSOR'S PARCEL NUMBERS: 061-260-026
(SEE ATTACHED MAP AT ATTACHMENTS A)
Please forward any written comments by September 23, 2021 to:
Francisco Mendoza-Gonzalez, Associate Planner
City of Merced Planning & Permitting Division
678 West 18th Street
Merced, CA 95340
209-385-6929
[email protected]
Applicant Contact Information:
Attn: Sam Sahota
PROJECT DESCRIPTION
The Project site consists of an approximate 10-acre parcel (APN: 061-261-025) located at 385 S.
Coffee Street (Attachment B), generally located on the west side of S. Coffee Street, 300 feet north of E. Gerard Avenue. The subject site has a Zoning classification of Urban Transition (U-T) and a General Plan designation of Low Density Residential ( LD). The subject site is generally surrounded by single-family homes and agricultural uses.
The applicant would like to develop a single-family subdivision, for a total of 45 residential lots with two lots for a tot lot and a basin lot. The current zoning designation of Urban Transition is intended for agricultural uses that were permitted when this property was in County jurisdiction prior to being annexed into the City in 2007. The parcels would remain independent, with vehicle access from the extension of Capella Drive out to S. Coffee Street and other local and arterial roads.
ATTACHMENT 4
Initial Study #22-32
Project Location
The subject site is located within th e sout heastern quadrant of Merce d. The subject site is surrounded by residential uses to the south, east, and west . The surrounding uses include single - family homes, with the lots to the south being residential but not part of a subdivision development.
The properties to the north are within an Urban Transition (U-T) Zone, and are being used for agricultural purposes. The table below identifies the surrounding uses:
Table 1 Surrounding Uses (Refer to Attachment A)
Surrounding
Land
Existing Use
of Land
Zoning
Designation
City General Plan
Land Use Designation
North
Agriculture Low Density
Residential
(R-1-5)
Low Density
Residential (LD)
South
Single-Family Homes Urban
Transition
(U-T)
Low Density
Residential (LD)
East
Single-Family Subdivision
(S. Coffee Street)
Low Density
Residential
(R-1-6)
Low Density
Residential (LD)
West
Single-Family Subdivision Residential
Planned
Development
(R-P-D) #39
Low Density
Residential (LD)
1. INITIAL FINDINGS
A. The proposal is a project as defined by CEQA Guidelines Section 15378.
B. The Project is not a ministerial or emergency project as defined under CEQA Guidelines (Sections 15369 and 15369).
C. The Project is therefore discretionary and subject to CEQA (Section 15357).
D. The Project is not Categorically Exempt.
E. The Project is not Statutorily Exempt.
F. Therefore, an Environmental Checklist has been required and filed.
2. CHECKLIST FINDINGS
A. An on-site inspection was made by this reviewer on October 25, 2022.
B. The checklist was prepared on November 7, 2022.
C. The Merced Vision 2030 General Plan and its associated Environmental Impact Report [EIR (SCH# 2008071069)] were certified in January 2012. The document comprehensively examined the potential environmental impacts that may occur as a result of build-out of the 28,576-acre Merced (SUDP/SOI). For those significant environmental impacts (Loss of Agricultural Soils and Air Quality) for which no Initial Study #22-32
mitigation measures were available, the City adopted a Statement of Overriding Considerations (City Council Resolution #2011- 63). This document her ein incorporates by reference the Merced Vision 2030 General Plan, the General Plan Program EIR (SCH# 2008071069), and Resolution #2011-63.
As a subsequent development project within the SUDP /SOI, many potential environmental effects of the Project have been previously considered at the program level and addressed within the General Plan and associated EIR. (Copies of the General Plan and its EIR are available for review at the City of Merced Planning and Permitting Division, 678 West 18th Street, Merced, CA 95340.) As a second tier environmental document, Initial Study # 22-32 plans to incorporate goals and policies to implement actions of the Merced Vision 2030 General Plan, along with mitigation measures from the General Plan EIR, as mitigation for potential impacts of the Project.
Project-level environmental impacts and mitigation measures (if applicable) have been identified through site-specific review by City staff. This study also utilizes existing technical information contained in prior documents and incorporates this information into this study.
3. ENVIRONMENTAL IMPACTS:
Will the proposed project result in significant impacts in any of the listed categories? Significant impacts are those that are substantial, or potentially substantial, changes that may adversely affect the physical conditions within the area affected by the Project including land, air, water, minerals, flora, fauna, ambient noise, and objects of historic or aesthetic significance. An economic or social change by itself shall not be considered a significant effect on the environment. A social or economic change related to a physical change may be considered in determining whether the physical change is significant. (Section 15372, State CEQA Guidelines. Appendix G of the Guidelines contains examples of possible significant effects.) A narrative descript ion of all “ potentially significant, ” “ negative declaration: potentially significant unless mitigation incorporated, ” and “less than significant impact” answers are provided within this Initial Study.
A. Aesthetics
SETTING AND DESCRIPTION
The project site is located in southeast Merced, approximately two and a half miles southeast of Downtown and half a mile north of Highway 99. The project site consists of a mostly undeveloped lot (with 1 home) totaling approximately 10 acres. The terrain is generally flat. T he site is surrounded by residential uses to the south, east, and west. Generally, the surrounding parcels consist of single-family homes. These buildings and structures range in height, between 20 and 40 feet.
The proposed project would include one single-family home on each newly created lot, for a total of 45 units. The site plans, floor plans, or elevations for this subdivision have not been submitted.
However, because the applicant is proposing a standard residential Z one (R-1-5), the subdivision would have to comply with the City’s general development standards for lots in the R-1-5 Zone as Initial Study #22-32
shown on Merced Municipal Code (MMC) Table 20.08-2 – Development Standards for Single - Family Residential Zoning Districts. The elevations would be required to comply with the City’s general design requirements for single -family homes as shown under MMC 20.46.020 – Design Standards for Single-Family Dwellings and Mobile Homes.
1) No Impact
No designated scenic vistas exist on the project site or in the project area. Therefore, no impacts in this regard would occur with this development. 2) No Impact
There are no officially designated State Scenic Highways or Routes in the project vicinity.
Therefore, the P roject would have no impact on scenic resources , such as rock outcroppings, trees, or historic buildings within a scenic highway. 3) Less-Than-Significant Impact
The proposed Project would transform the site from a mostly undeveloped site to a fully developed site. Undeveloped lots tend lead to concerns regarding weed abatement, waste drop-off, and general dilapidation. The proposed buildings, parking, and streets would fully develop the site. The units would add architectural interest with the use of siding, stucco, and stone veneers or as otherwise meet ing the City’s minimum single -family design standards. Based on these factors, this impact is considered to be less than significant. 4) Less Than Significant
Construction of the proposed project and off-site improvements include new lighting on the buildings and throughout the extension of the street (Capella Drive). This new lighting could be a source of light or glare that would affect the views in the area. However, the City of Merced has adopted the California Green Building Standards Code as Section 17.07
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
A. Aesthetics. Will the Project:
1) Have a substantial adverse effect on a scenic
vista?
2) Substantially damage scenic resources including,
but not limited to, trees, rock outcroppings, and
historic buildings within a state scenic highway?
3) Substantially degrade the existing visual
character or quality of the site and its
surroundings?
4) Create a new source of substantial light or glare
which would adversely affect day or nighttime
views in the area?
Initial Study #22-32
of the Merced Municipal Code. As administered by the City, the Green Building Standards Code prohibits the spillage of light from one lot to another. This would prevent new glare effects on the existing buildings surrounding the project site.
B. Agriculture Resources
SETTING AND DESCRIPTION
Merced County is among the largest agriculture producing Counties in California (ranked fifth), with a gross income of more than $4.4 billion . The County’s leading agriculture commodities include milk, almonds, cattle and calves, chickens, sweet potatoes, and tomatoes.
1) No Impact
The project site is located with in the City Limits of Merced. The California Department of Conservation prepares Important Farmland Maps through its Farmlands Mapping and Monitoring Program (FMMP). The system of classifying areas is based on soil type and use. According to the Merced Count y Important Farmlands Map, the project site is classified as “Farmland of Local Importance”. The conversion of this land from a mostly undeveloped lot (not being used for agricultural purposes) with a single -family to a developed urban parcel was analyzed as part of the Environmental Review for the Merced Vision 2030 General Plan. Th e development of single-family homes on “ Farmland of Local Importance” that is not being used for agricultural purposes is considered to have less than significant impact. Therefore, CEQA requires no further review.
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
B. Agriculture Resources. Will the Project:
1) Convert Prime Farmland, Unique Farmland,
or Farmland of Statewide Importance
(Farmland), as shown on the maps prepared
pursuant to the Farmland Mapping and
monitoring Program of the California
Resources Agency, to non-agriculture?
2) Conflict with existing zoning for agricultural
use, or a Williamson Act contract?
3) Involve other changes in the existing
environment, which, due to their location or
nature, could result in conversion of
Farmland, to non-agricultural use?
4) Cause development of non-agricultural uses
within 1,000 feet of agriculturally zoned
property (Right-to-Farm)?
Initial Study #22-32
2) No Impact
There are no Williamson Act contract lands in this area and the land is not being used for agricultural uses. Therefore, there is no impact.
3) Less-Than-Significant Impact
Refer to Item #1 above.
4) No Impact
The nearest land being used for farming is located adjacent north of the subject site . The proposed development would not affect farming operations as the farm site is located on a separate parcel.
C. Air Quality
SETTING AND DESCRIPTION
For additional information see Appendix A at Attachment C for combined studies on Air Quality, Green House Gas Emissions, and Vehicle Miles Traveled.
The project site is in the San Joaquin Valley Air Basin (SJVAB), which includes the southern half of the Central Valley and is approximately 250 miles long and an average of 35 miles wide. The Coast Ranges, which have an average height of 3,000 feet, serve as the western border of the SJVAB. The San Emigdio Mountains, part of the Coast Ranges, and the Tehachapi Mountains, part of the Sierra Nevada, are both south of the SJVAB. The Sierra Nevada extends in a northwesterly direction and forms the air basin’s eastern boundary. The SJVAB is mostly flat with a downward gradient to the northwest.
The climate of the SJVAB is heavily influenced by the presence of these mountain ranges. The mountain ranges to the west and south induce winter storms from the Pacific Ocean to release precipitation on the western slopes, producing a partial rain shadow over the valley. A rain shadow is defined as the region on the leeward side of a mountain where noticeably less precipitation occurs because clouds and precipitation on the windward side remove moisture from the air. In addition, the mountain ranges block the free circulation of air to the east and entrap stable air in the Central Valley for extended periods during the cooler months.
Winters in the SJVAB are mild and fairly humid, and summers are hot, dry, and typically cloudless.
During the summer, a high-pressure cell is centered over the northeastern Pacific, resulting in stable meteorological conditions and steady northwesterly winds.
Existing Ambient Air Quality
The California Air Resources Board (ARB) and the U.S. Environmental Protection Agency (EPA) focus on ozone, carbon monoxide (CO), nitrogen dioxide (NO 2), sulfur dioxide (SO2), particulate
matter (PM), and lead as indicators of ambient air quality. Because these are the most prevalent air pollutants known to be deleterious to human health and extensive health-effects criteria documents are available, they are commonly referred to as criteria air pollutants.
EPA has established primary and secondary national ambient air quality standards (NAAQS) for ozone, CO, NO
2, SO2, respirable particulate matter 10 micrometers or less in diameter (PM10), fine particulate matter 2.5 micrometers or less in diameter (PM2.5), and lead. The primary and secondary Initial Study #22-32
standards are intended to protect public health and public welfare, respectively. In addition to the NAAQS, ARB has established California ambient air quality standards (CAAQS) for sulfates, hydrogen sulfide, vinyl chloride, and visibility- reducing particulate matter. In most cases, the CAAQS are more stringent than the NAAQS.
Concentrations of criteria air pollutants are measured at several monitoring stations in the SJVAB.
Since 1991 there have been two monitoring stations in Merced: S. Coffee Avenue and 2334 M Street. Table C-1 summarizes air quality data from these monitoring stations for the most recent years available. The 8 -hour state and federal ozone, 1- hour state ozone, state and federal PM
2.5,
and state PM10 standards were all exceeded on multiple days between 2011 and 2016, while the federal PM10 standard has never been exceeded (see Table C-1).
Table C-1
Ambient Air Quality in Merced:
Number of Days Exceeding State and Federal Standards
Year
Merced—S. Coffee Avenue Merced—2334 M Street
Ozone
Federal
PM2.52
PM10
Federal
PM2.52
8-Hour
State
8-Hour
Federal1
1-Hour
State State2 Federal2
2016 29 28 2 5 6 0 2
2015 34 29 2 15 5 0 5
2014 44 40 3 16 9 0 5
2013 31 29 5 16 13 0 11
2012 25 24 2 8 9 0 4
2011 41 38 2 21 8 0 2
Both ARB and EPA use monitoring data to designate areas according to their attainment status for criteria air pollutants. The purpose of the designations is to identify areas with air quality problems and thereby initiate planning efforts for improvement. The three basic designation categories are nonattainment, attainment, and unclassified . Unclassified is used in an area that cannot be classified on the basis of available information as meeting or not meeting the standards. In addition, the California designations include a subcategory of the nonattainment designation, called nonattainment-transitional. The nonattainment-transitional designation is given to nonattainment areas that are progressing and nearing attainment. Table C-2 presents the attainment designations for Merced County for each criteria pollutant.
Notes: PM2.5 = fine particulate matter 2.5 micrometers or less in diameter; PM10 = respirable particulate matter 10 micrometers or less in diameter
1 National 2015 standard (0.070 part per million).
2 Measured number of days over the 24-hour standard.
Source: ARB 2017a
Initial Study #22-32
Table C-2
Merced County Attainment Designations (Federal and State) Pollutant
Designation/Classification
Federal Standards State Standards
Ozone—1-Hour No Federal Standard1 Nonattainment/Severe
Ozone—8-Hour Nonattainment/Extreme Nonattainment
PM10 Attainment Nonattainment
PM2.5 Nonattainment Nonattainment
CO Unclassified/Attainment Unclassified/Attainment
NO2 Unclassified/Attainment Attainment
SO2 Unclassified/Attainment Attainment
Lead (Particulate) No Designation/Classification Attainment Hydrogen Sulfide No Federal Standard Unclassified
Sulfates No Federal Standard Attainment
Visibility-Reducing Particles No Federal Standard Unclassified Vinyl Chloride No Federal Standard Attainment
The San Joaquin Valley Air Pollution Control District (SJVAPCD) attains and maintains air quality conditions in Merced County through a comprehensive program of planning regulation, enforcement, technical innovation, and promotion of the understanding of air quality issues. The clean-air strategy of SJVAPCD includes preparing plans for the attainment of ambient air quality standards, adopting and enforcing rules and regulations governing air pollution sources (SJVAPCD 2017b), and issuing permits for stationary sources of air pollution. SJVAPCD also inspects stationary sources and responds to citizen complaints, monitors ambient air quality and meteorological conditions, and implements programs and regulations required by the federal Clean Air Act and the California Clean Air Act.
The Guide for Assessing and Mitigating Air Quality Impacts is an advisory document that provides uniform procedures for lead agencies, consultants, and project applicants to use when addressing air quality in environmental documents (SJVAPCD 2015). The guide contains:
• criteria and thresholds for determining whether a project may have a significant adverse impact on air quality;
• specific procedures and modeling protocols for quantifying and analyzing air quality impacts;
• methods available to mitigate impacts; and,
• information for use in air quality assessments and environmental impact reports that will be updated more frequently such as air quality data, regulatory setting, climate, and topography.
Notes: CO = carbon monoxide; NO2 = nitrogen dioxide; PM2.5 = fine particulate matter 2.5 micrometers or less in diameter; PM10 = respirable particulate matter 10 micrometers or less in diameter; SO2 = sulfur dioxide 1 The federal 1-hour ozone national ambient air quality standard was revoked on June 15, 2005.
Source: SJVAPCD 2017a
Initial Study #22-32
Regulatory Context
AMBIENT AIR QUALITY STANDARDS
Under the California Clean Air Act (CAA) establishes maximum ambient concentrations for the ten criteria air pollutants (CAPs), known as the California Ambient Air Quality Standards (CAAQS). The six CAPs are ozone (O 3), nitrogen dioxide (NO 2), sulfur dioxide (SO 2), carbon monoxide (CO), lead (Pb), particulate matter 10 and 2.5 microns in size (PM 10 and PM 2.5), hydrogen sulfide, sulfates, visibility reducing particles, and vinyl chloride. Concentrations above these time-averaged limits are anticipated to cause adverse health effects to sensitive receptors.
Table 1 shows the standards for the various averaging times for criteria pollutants under the CAAQS. The San Juaquin Valley Air Basin (SJVAB) is in nonattainment for the following CAAQS criteria pollutants: ozone, PM
10, PM2.5.
TABLE 1
STATE AND FEDERAL AMBIENT AIR QUALITY STANDARDS
Pollutant Averaging Time
Standard
parts per million or
microgram per cubic
meter
CAAQS
Ozone 1 hour 0.09
8 hour 0.070
CO 8 hour 9
1 hour 20
NO2 Annual Mean 0.03
1 hour 0.18
SO2
24 hour 0.04
3 hour N/A
1 hour 0.25
PM10 Annual Mean (20)
24 hour (50)
PM2.5
Annual
arithmetic mean (12)
24 hour N/A
Pb
Rolling 3-Moth
Average N/A
30 Days (1.5)
Hydrogen
Sulfide 1 hour 0.03
Initial Study #22-32
Vinyl Chloride 24 hour 0.01
Sulfate 24 hour (25)
Visibility
Reducing
Particles
8 hour extinction of 0.23 per
km
CALIFORNIA STATE IMPLEMENTATION PLAN (SIP)
California's SIP is comprised of the State’s overall air quality attainment plans to meet the NAAQS as well as the individual air quality attainment plans of each Air Quality Management District (AQMD) and Air Pollution Control District (APCD). The items included in the California SIP are listed in 40 CFR Chapter I, Part 52, Subpart F §52.220. The California SIP is a compilation of new and previously submitted plans, programs (such as monitoring, modeling, permitting, etc.), AQMD and APCD rules, State regulations, and federal controls for each air basin and California's overall air quality. Many of the items within the California SIP rely on the same control strategies, such as emissions standards for cars and heavy trucks, fuel regulations, and limitations on emissions from consumer products. AQMDs and APCDs, as well as other agencies such as the Bureau of Automotive Repair, prepare draft California SIP elements and submit them to CARB for review and approval. The California CAA identifies California Air Resource Board (CARB) as the lead agency for compiling items for incorporation into the California SI P, and submitting the items to the CalEPA for approval. San Juaquin Valley Air Basin (SJVAB) is in nonattainment for ozone, PM
10, PM2.5 and have approved SIPs.
SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT (SJVAPCD) The SJVAPCD is a regional agency which regulates stationary sources of air pollution within the SJVAB whose boundaries are contiguous with the County’s boundaries. Its primary purpose is to enforce local, state, and federal air quality regulations in order to satisfy ambient air quality standards and protect the public from harm due to poor air quality. The SJVAPCD regulates air quality through its permit authority over most types of stationary emission sources and through its planning and review activities. Additionally, the SJVAPCD regulates open and agricultural burning and is responsible for air quality monitoring, preparing clean air plans, and responding to citizen complaints regarding air quality.
All projects in Merced County and in the community of Merced are subject to applicable SJVAPCD rules and regulations in effect at the time of construction and operation. The SJVAPCD has adopted air quality thresholds for determination of impact significance for projects subject to CEQA review. Air quality significance criteria is provided in Table 2.
Initial Study #22-32
TABLE 2
AIR QUALITY THREHOLDS OF SIGNIFICANCE – CRITERIA POLLUTANTS Pollutant/Precursor
Construction
Emissions
Operational Emissions
Permitted
Equipment
and
Activities
Permitted
Equipment
and
Activities
Tons/Year
CO 100 100 100
NOx 10 10 10
ROG 10 10 10
SOx 27 27 27
PM10 15 15 15
PM2.5 15 15 15
SJVAPCD, AQ Thresholds of Significance – Criteria Pollutants
METHODOLOGY
The Proposed Project’s short-term construction-related criteria pollutant emissions were estimated using California Emissions Estimator Model (CalEEMod) Version 2020.4.0. The CalEEMod used default values for construction and operational emissions estimate. Because the City does not provide criteria pollutant emission thresholds, estimated project -related criteria pollutant emissions were compared to the SJVAPCD construction and operational criteria pollutant significant criteria shown in Table 2.
Merced County is classified as nonattainment under the CAAQS for ozone, PM 10, and PM 2.5;
therefore, an applicable SIP or other applicable air quality plans have been developed and approved by the State of California. The SJVAPCD has developed significance criteria for criteria air pollutants as shown in Table 2, if the project’s emission do not exceed the significance criteria then the project is considered to have a less than significant impact on air quality.
Construction
Construction of the project would require demolition, site preparation, grading, building/infrastructure, paving and architectural coating. As shown in Table 3, construction criteria emission would not exceed the SJVAPCD significance criteria. Less than Significant.
Initial Study #22-32
TABLE 3
MAXIMUM ANNUAL CONSTRUCTION EMISSIONS
Pollutant/Precursor
Construction
Emissions
Significant
Criteria
Exceed
Significant
Tons/Year
CO 1.66 100 No
NOx 1.59 10 No
ROG 0.83 10 No
SOx .003 27 No
Total PM10 0.26 15 No
Total PM2.5 0.16 15 No
Operation
Operation of the project would emit criteria pollution from area, energy, mobile, stationary, waste, and water sources. Table 4 shows the emissions from the operation of the project with 45 single family homes. As shown in Table 4 project emission would not exceed the SJVAPCD significance threshold. Therefore, operation of the project would not adversely impact regional air quality. Less than Significant.
TABLE 4
MAXIMUM ANNUAL OPERATIONAL EMISSIONS
Pollutant/Precursor
Construction
Emissions
Significant
Criteria
Exceed
Significant
Tons/Year
CO 2.46 100 No
NOx 0.59 10 No
ROG 0.63 10 No
SOx 0.01 27 No
Total PM10 0.47 15 No
Total PM2.5 0.14 15 No
Cumulative Impacts
Although SJVAPCD does not have any quantitative cumulative significant criteria, air quality is cumulative in nature. CAAQS are predicated on past, present, and future emissions; therefore, if project-related emission are found to have a less-than-significant impact in the near-term conditions, then cumulative impacts would also be less-than-significant. Project-related air Initial Study #22-32
quality impacts were found to be less-than-significant in the near-term conditions; therefore, the project would not adversely affect regional air quality in the future. Less than Significant.
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
C. Air Quality. Would the project:
1) Conflict with or obstruct implementation of
the applicable air quality plan?
2) Violate any air quality standard or
contribute substantially to an existing or
projected air quality violation?
3) Result in a cumulatively considerable net
increase of any criteria pollutant for which
the project region is non -attainment under
an applicable federal state ambient air
quality standard (including releasing
emissions which exceed quantitative
thresholds for O3 precursors)?
4) Expose sensitive receptors to substantial
pollutant concentrations?
5) Create objectionable odors affecting a
substantial number of people?
Impacts are evaluated below on the basis of both State CEQA Guidelines Appendix G criteria and SJVAPCD significance criteria.
SJVAPCD’s thresholds for determining environmental significance separate a project’s short-term emissions from long- term emission s. The short -term emissions are related mainly to the construction phase of a project. For this project, the long- term emissions are related primarily to household trips.
1) Less-than-Significant Impact
Air quality plans describe air pollution control strategies to be implemented by a city, county, or region. SJVAPCD is responsible for developing and implementing AQAPs for each criteria air pollutant for which the region does not meet the applicable standard.
AQAP documents are transmitted to ARB and EPA for incorporation into the SIP, a general plan to attain and maintain the NAAQS for complying with the federal Clean Air Act.
The plans account for projections of population growth and vehicle miles traveled (VMT) provided by the San Joaquin Council of Governments in the SJVAB and identify strategies for bringing regional emissions into compliance with federal and state air quality standards.
Because population growth and projected VMT are the basis of the AQAPs’ strategies, a Initial Study #22-32
project would conflict with a plan if it would result in more growth or VMT than projected in the applicable plan. The primary way of determining whether a project would result in more growth or VMT than in the AQAPs is to determine consistency with the applicable general plan.
The Merced Vision 2030 General Plan (City of Merced , 2012) is the applicable general plan. However, the population projections used in the previous general plan, the Merced Vision 2015 General Plan (City of Merced 1997), included projects through 2035 and were higher than those used in the 2030 G eneral Plan (see Table C -4). The project site has a residential land use designation in the Merced Vision 2030 General Plan. Because the project would involve an existing land use within the plan area, it can be assumed that it was included in the Merced Vision 2030 General Plan. The proposed 45 units is slightly less than the 60 units that could be developed under the current General Plan designation.
It is reasonable to assume that the growth was accounted for in the AQAP’s calculations and that this project would not create a significant impact. Therefore, implementation of the project would not exceed the assumptions used to develop the air quality plans and would neither obstruct nor conflict with implementation strategie s. The impact would be less than significant.
Table C-4
Population Projections in the Current and Previous Merced General Plans Year
Population within City
2015 SUDP Area
Percent of
Merced County
Merced Vision 2015 General Plan (1997): 1990–2035 Projections 1990 60,900 34.1
1995 83,830 35.2
2000 89,940 35.5
2010 116,800 38.3
2015 133,250 39.2
2020 149,700 39.7
2035 202,070 42.3
Merced Vision 2030 General Plan (2012): 2000–2030 Projections 2000 63,893 30.4
2005 74,010 30.7
2010 85,798 31.1
2015 99,463 31.6
2020 115,305 32.1
2030 154,961 33.7
2) Less-than-Significant Impact
As part of the building permit review process, the applicant is required to consult with the San Joaquin Valley Air Pollution Control District (SJVAPCD). The developer is responsible for adhering to all air quality mitigation measures during the construction phase Notes: City = City of Merced; SUDP = Specific Urban Development Plan Sources: City of Merced 1997, 2012
Initial Study #22-32
as required by the SJVAPCD and the California Building Code. Due to these permitting requirements, the impact would be less than significant. 3) Less-than-Significant Impact
The applicant is proposing to develop a total of 45 residential units on a subject area that is currently has a maximum General Plan designation density of 60 residential units. Given the population projections shown on Table C-4, the additional units are factored into the General Plan’s projected growth. The increase in density from current 1 residential unit to 45 residential units are more consistent with smart growth and sustainability principles .
Therefore, this impact would be less than significant.
4) Less-than-Significant Impact
Sensitive receptors are facilities that house or attract children, the elderly, and people with illnesses, or other people who are especially sensitive to the effects of air pollutants.
Examples o f sensitive receptors include hospitals, schools, convalescent facilities, and residential areas. The project is on mostly undeveloped land in an area partly developed with residential uses.
The greatest potential for project -related emissions of toxic air contaminants (TACs) is related to the diesel PM emissions that would be generated by heavy- duty construction equipment. Off-road construction equipment used for the project would generate diesel exhaust PM emissions. According to the Office of Environmental Health Hazard Assessment, health risk assessments that determine the health risks associated with exposure of residential receptors to TAC emissions should be based on a 30-year exposure period (OEHHA 2015). However, health risk assessments should be l imited to the period/duration of emissions -generating activity. Project construction would last approximately 6 months, less than 2 percent of the required exposure period for health risk assessments. Additionally, because no sensitive receptors are in the project vicinity, the risk of exposure would be minimal.
Neither construction-related nor operational emissions for the project would exceed the thresholds of significance. Therefore, the project would not expose nearby sensitive receptors to substantial pollutant concentrations. This impact would be less than significant.
5) Less-than-Significant Impact
The occurrence and severity of o dor impacts depend on numerous factors, including the nature, frequency, and intensity of the source; wind speed and direction; and the presence of sensitive receptors. Offensive odors rarely cause any physical harm, but they still can be very unpleasant, leading to considerable distress and often generating citizen complaints to local governments and regulatory agencies.
Project construction equipment would emit diesel exhaust that could result in short -term odorous emissions. However, because of the temporary nature of these emissions, the highly diffusive properties of diesel exhaust, and the location of the project site, construction-related odors would not affect a substantial number of people. Standard Initial Study #22-32
construction techniques would be implemented, and the odors would be temporary and typical of most construction sites. Once constructed, the site would be used for residential purposes, so the ongoing operations would not be a source of odors.
Potential sources of odors during project construction would include exhaust from diesel construction equipment. Odors from off -road equipment and on- road vehicles would be temporary and typical of most construction sites. Therefore, potential odor emissions would be short term and would not be considered harmful or a nuisance to a substantial number of people. This impact would be less than significant.
D. Biological Resources
SETTING AND DESCRIPTION
The project site is located in south eastern Merced, approximately two and a half miles southeast of Downtown and a half mile north of Highway 99. The development is surrounded by sites that are considered developed (east, west, and south), with agricultural uses to the north. The project site does not contain any creeks, or other wetland areas.
The general project area is located in the Central California Valley eco -region (Omernik 1987).
This eco-region is characterized by flat, intensively farmed plains with long, hot, dry summers and cool, wet winters (14- 20 inches of precipitation per year). The Central California Valley eco - region includes the Sacramento Valley to the north, the San Joaquin Valley to the south, and it ranges between the Sierra Nevada Foothills to the east and the Coastal Range foothills to the west.
Nearly half of th e eco-region is actively farmed, and about three -fourths of that farmed land is irrigated.
The biological resources evaluation, prepared as part of the Merced Vision 2030 General Plan Program Environmental Impact Report (EIR), does not identify the project area as containing any seasonal or non-seasonal wetland or vernal pool areas. Given the adjacent, built -up, urban land uses/agricultural uses and major roadways, no form of unique, rare or endangered species of plant and/or animal life could be sustained on the subject site.
Initial Study #22-32
1) No Impact
The proposed project would not have any direct effects on animal life by changing the diversity of species, number of species, reducing the range of any rare or endangered species, introducing any new species, or leading to deterioration of existing fish or wildlife habitat. Although the Merced Vision 2030 General Plan identifies several species of plant and animal life that exist within the City’s urban boundaries, the subject site does not contain any rare or endangered species of plant or animal life.
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
D. Biological Resources. Would the Project:
1) Have a substantial adverse effect, either directly
or through habitat modification, on any species
identified as a candidate, sensitive, or special
status species in local or regional plans,
policies, or regulations, or by the California
Department of Fish and Game or U.S. Fish and
Wildlife Service?
2) Have a substantial adverse effect on any
riparian habitat or other sensitive natural
community identified in local or regional plans,
policies, regulations, or by the California
Department of Fish and Game or U.S. Fish and
Wildlife Service?
3) Have a substantial adverse effect on federally
protected wetlands as defined by Section 404 of
the Clean Water Act (including, but not limited
to, marsh, vernal pool, coastal, etc.) through
direct removal, filling, hydrological
interruption, or other means?
4) Interfere substantially with the movement of
any native resident or migratory fish or wildlife
species or with established native resident or
migratory wildlife corridors, or impede the use
of native wildlife nursery sites?
5) Conflict with any local policies or ordinance s
protecting biological resources, such as a tree
preservation policy or ordinance?
6) Conflict with the provisions of an adopted
Habitat Conservation Plan, Natural Community
Conservation Plan, or other approved local,
regional, or state habitat conservation plan?
Initial Study #22-32
2) Less-than -Significant Impact
The proposed project would not have any direct effects on riparian habitat or any other sensitive natural community. The City General Plan identifies Bear, Black Rascal, Cottonwood, Miles, Fahrens, and Owens Creeks within the City’s growth area. The subject site is approximately 2.5 miles from Bear and Black Rascal Creek which are Waters of the U.S. under the jurisdiction of the U.S. Army Corps of Engineers (ACOE) , the California Department of Fish and Wildlife (CDFW), and the Regional Water Quality Control Board.
Any proposed “fill ” of that waterway would be subject to permits from ACOE, CDFW, and the Regional Water Quality Control Board. No such “fill” or disturbance of the waterway is proposed as part of this development. The City’s General Plan requires the preservation of the c reek in its natural state. No riparian habitat identified in CDFW or USFW plans are present on the project site. Therefore, the Project would have a less-than- significant impact on riparian habitat.
3) No Impact
The project site would not have any direct effect on wetlands as no wetlands have been identified in the project area.
4) No Impact
The Project would not have any adverse effects on any resident or migratory fish or wildlife species or with established native resident migratory wildlife corridor, or impede the use of native wildlife nursery sites.
5) Less Than Significant Impact
The Project would not interfere with any local policies or ordinances protecting biological resources such as tree preservation policy or ordinance. The City requires the planting and maintenance of street trees along all streets and parking lot trees in parking lots but has no other tree preservation ordinances.
6) No Impact
The proposed project would not conflict with the provisions of a habitat conservation plan.
There are no adopted Habitat Conservation Plans, Natural Conservation Community Plan, or other approved local, regional, or state Habitat Conservation Plan for the City of Merced or Merced County.
E. Cultural Resources
SETTING AND DESCRIPTION
The City of Merced area lies within the ethnographic territory of the Yokuts people. The Yokuts were members of the Penutian language family which held all of the Central Valley, San Francisco Bay Area, and the Pacific Coast from Marin County to near Point Sur.
Merced County was first explored by Gabriel Moraga in 1806, when he named the Merced River, “El Rio de Nuestra Sen ra de la Merced.” Moraga’s explorations were designed to locate appropriate sites for an inland chain of missions. Moraga explored the region again in 1808 and 1810.
Initial Study #22-32
Archaeology
Archaeological sites are defined as locations containing significant levels of resources that identify human activity. Very little archaeological survey work has been conducted within the City or its surrounding areas. Creeks, drainage, and sloughs exist in the northern expansion area of the City, and Bear Creek and Cottonwood Creek pass through the developed area. Archaeological sites in the Central Valley are commonly located adjacent to waterways and represent potential for significant archaeological resources.
Paleontological sites are those that show evidence of pre -human existence. T hey are small outcroppings visible on the earth’s surface. While the surface outcroppings are important indications of paleontological resources, it is the geological formations that are the most important.
There are no known sites within the project area known to contain paleontologic al resources of significance.
Historic Resources
In 1985, in response to community concerns over the loss of some of the City’s historic resources, and the perceived threats to many remaining resources, a survey of historic buildings was undertaken in the City. The survey focused on pre-1941 districts, buildings, structures, and objects of historical, architectural, and cultural significance. The survey area included a roughly four square-mile area of the central portion of the City.
The National Register of Historic Places, the California Historical Landmarks List, and the California Inventory of Historic Resources identify several sites within the City of Merced. These sites are listed on the Merced Historical Site Survey and are maintained by the Merced Historical Society. There are no listed historical sites on the project site.
According to the environmental review conducted for the General Plan, there are no listed historical sites and no known locations within the project area that contain sites of paleontologic or archeological significance. The General Plan (Implementation Action SD -2.1.a) requires that the City utilize standard practices for preserving archeological materials that are unearthed during construction, as prescribed by the State Office of Historic Preservation.
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
E. Cultural Resources. Would the Project:
1) Cause a substantial adverse change in the
significance of a historical resource as defined
in §15064.5?
2) Cause a substantial adverse change in the
significance of an archaeological resource
pursuant to §15064.5?
3) Directly or indirectly destroy a unique
paleontological resource or site or unique
geologic feature?
4) Disturb any human remains, including those
interred outside of formal cemeteries?
Initial Study #22-32
1) Less-than-Significant Impact
The Project would not alter or destroy any known historic or archaeological site, building, structure, or object; nor would it alter or affect unique ethnic cultural values or restrict religious or sacred uses. According to the environmental review conducted for the General Plan, there are no listed historical sites and no known locations within the project area that contain sites of historical or archeological significance. The General Plan (Implementation Action SD -2.1.a) requires that the City utilize standard practices for preserving archeological materials that are unearthed during construction, as prescribed by the State Office of Historic Preservation.
2) Less-than-Significant Impact
The P roject would not alter or destroy any known prehistoric or archaeological site, building, structure, or object; nor would it alter or affect unique ethnic cultural values or restrict religious or sacred uses. According to the environmental review conducted for the General Plan, there are no listed historical sites and no known locations within the project area that contain sites of historical or archeological significance. The General Plan (Implementation Action SD -2.1.a) requires that the City utilize standard practices for preserving archeological materials that are unearthed during construction, as prescribed by the State Office of Historic Preservation.
3) Less-than-Significant Impact
The P roject would not alter or destroy any paleontological resource, site , or unique geological feature. According to the environmental review conducted for the General Plan, there are no listed historical sites and no known locations within the project area that contain sites of paleontological significance. The General Plan (Implementation Action SD-2.1.a) requires that the City utilize standard practices for preserving archeological materials that are unearthed during construction, as prescribed by the State Office of Historic Preservation.
4) Less-than-Significant Impact
The proposed project would not disturb any known human remains, including those interred outside of formal cemeteries ; nor would it alter or affect unique ethnic cu ltural values or restrict religious or sacred uses. There are no known cemeteries in the project area. Excavation of the site would be needed to construct the proposed project, so it is possible that human remains would be discovered. However, Section 7050.5 of the California Health and Safety Code requires that if human remains are discovered during the construction phase of a development, all work must stop in the immediate vicinity of the find and the County Coroner must be notified. If the remains are determined to be Native American, the Coroner will notify the Native American Heritage Commission, which in turn will inform a most likely descendant. The descendant will then recommend to the landowner the appropriate method for the disposition of the remains and any associated grave goods. Additionally, the City’s General Plan (Implementation Action SD-
2.1.a) requires that the City utilize standard practices for preserving archeological materials that are unearthed during construction, as prescribed by the State Office of Historic Preservation. By following the requirements of the Health and Safety Code and Initial Study #22-32
Compliance with the City’s General Plan, this potential impact would be less than significant.
F. Geology and Soils
SETTING AND DESCRIPTION
The City of Merced is located approximately 150 miles southeast of San Francisco along the east side of the southern portion of the Great Valley Geomorphic Province, more commonly referred to as the San Joaquin Valley. The valley is a broad lowland bounded by the Sierra Nevada to the east and Coastal Ranges to the west. The San Joaquin Valley has been filled with a thick sequence of sedimentary deposits from Jurassic to recent age. A review of the geological map indicates that the area around Merced is primarily underlain by the Pleistocene Modesto and Riverbank Formations with Holocene alluvial deposits in the drainages. Miocene -Pliocene Mehrten and Pliocene Laguna Formation materials are present in outcrops on the east side of the SUDP/SOI.
Modesto and Riverbank Formation deposits are characterized by sand and silt alluvium derived from weathering of rocks deposited east of the SUDP/SOI. The Laguna Formation is made up of consolidated gravel sand and silt alluvium and the Mehrten Formation is generally a well consolidated andesitic mudflow breccia conglomerate.
Faults and Seismicity
A fault, or a fracture in the crust of the earth along which rocks on one side have moved relative to those on the other side, are an indication of past seismic activity. It is assumed that those that have been active recently are the most likely to be active in the future, although even inactive faults may not be “dead.” “Potentially Active” faults are those that have been active during the past two million years or dur ing the Quaternary Period. “Active” faults are those that have been active within the past 11,000 years. Earthquakes originate where movement or slippage occurs along an active fault. These movements generate shock waves that result in ground shaking.
Based on review of geologic maps and reports for the area, there are no known “ active” or “potentially active” faults, or Alquist -Priolo Earthquake Fault Zones (formerly referred to as a Special Studies Zone) in the SUDP/SOI. In order to determine the distance of known active faults within 50 miles of the Site, the computer program EZ-FRISK was used in the General Plan update.
Soils
Soil properties can influence the development of building sites, including site selection, structural design, construction, performance after construction, and maintenance. Soil properties that affect the load -supporting capacity of an area include depth to groundwater, ponding, flooding, subsidence, shrink-swell potential, and compressibility.
Initial Study #22-32
1) Less than Significant Impact
The project site is not located within a mapped fault hazard zone, and there is no record or evidence of faulting on the project site (City of Merced General Plan Figure 11.1).
Because no faults underlie the project site, no people or structures would be exposed to substantial adverse effects related to earthquake rupture.
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
F. Geology and Soils. Would the Project:
1) Expose people or structures to potential
substantial adverse effects, including the
risk of loss, injury, or death involving:
a) Rupture of a known earthquake fault, as
delineated on the most recent Alquist -
Priolo Earthquake Fault Zoning Map issued
by the State Geologist for the area or based
on other substantial evidence of a known
fault?
b) Strong seismic ground shaking?
c) Seismic-related ground failure, including
liquefaction?
d) Landslides?
2) Result in substantial soil erosion or loss of
topsoil?
3) Be located on a geologic unit or soil that is
unstable, or that would become unstable as
a result of the project, and potentially result
in on- or offsite landslide, lateral spreading,
subsidence, liquefaction, or collapse?
4) Be located on expansive soil, as defined in
Table 18 -1-B of the Uniform Building Code
(1994), creating substantial risks to life or
property?
5) Have soils incapable of adequately supporting
the use of septic tanks or alternative waste water
disposal systems where sewers are not available
for the disposal of waste water?
Initial Study #22-32
According to the City’s Merced Vision 2030 General Plan EIR , the probability of soil liquefaction occurring within the City of Merced is considered to be a low to moderate hazard; however, a detailed geotechnical engineering investigation would be required for the project in compliance with the California Building Code (CBC).
There would be no exposure to any geological hazards in the project area.
Ground shaking of moderate severity may be expected to be experienced on the project site during a large seismic event. All building permits are reviewed to ensure compliance with the California Building Code (CBC). In addition, the City enforces the provisions of the Alquist Priolo Special Study Zones Act that limit development in areas identified as having special seismic hazards. All new structures shall be designed and built in accordance with the standards of the California Building Code.
APPLICABLE GENERAL PLAN GOALS AND POLICIES
The City’s Merced Vision 2030 General Plan contains policies that address seismic safety.
Goal Area S-2: Seismic Safety:
Goal: Reasonable Safety for City Residents from the Hazards of Earthquake and Other Geologic Activity
Policies
S-2.1 Restrict urban development in all areas with potential ground failure characteristics.
The Project would not expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving landslides.
Landslides generally occur on slopes of 15 percent or greater. The project site’s topography is generally of slopes between 0 and 3 percent, which are considered insufficient to produce hazards other than minor sliding during seismic activity.
Therefore, no hazardous conditions related to seismic ground shaking would occur with the implementation of the P roject. Additionally, the implementation of the project would not lead to offsite effects related to hazards related to seismic gr oundshaking, nor would any existing off-site hazards be exacerbated.
2) Less-Than-Significant Impact
Construction associated with the proposed project could result in temporary soil erosion and the loss of topsoil due to construction activities, including clearing, grading, site preparation activities, and installation of the proposed buildings and other improvements.
The City of Merced enforces a Storm Water Management Program in compliance with the Federal Clean Water Act. All construction activities are required to comply with the City’s Erosion and Sediment Control Ordinance (MMC §15.50.120.B), including the implementation of Best Management Practices (BMPs) to limit the discharge of sediment. 3) Less Than Significant Impact
The City of Merced is located in the Valley area of Merced County and is , therefore, less likely to experience landslides than other areas in the County. The probability of soil liquefaction actually taking place anywhere in the City of Merced is considered to be a low hazard. Soil types in the area are not conducive to liquefaction because they are either too Initial Study #22-32
coarse or too high in clay content. According to the Merced Vision 2030 General Plan EIR, no significant free face failures were observed within this area and the potential for lurch cracking and lateral spreading is, therefore, very low within this area. 4) Less-Than-Significant
Expansive soils are those possessing clay particles that react to moisture changes by shrinking (when they dry) or swelling (when they become wet). Expansive soils can also consist of silty to sandy clay. The extent of shrinking and swelling is influenced by the environment, extent of wet or dry cycles, and by the amount of clay in the soil. This physical change in the soils can react unfavorably with building foundations, concrete walkways, swimming pools, roadways, and masonry walls.
Implementation of General Plan Policies, adh erence to the Alquist -Priolo Act, and enforcement of the California Building Code (CBC) Standards would reduce the effect of this hazard on new buildings and infrastructure associated with the proposed development.
This would reduce potential impacts to a less-than-significant level. 5) No Impact
The project site would not have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater. However, the proposed project would be served by the City’s sewer system. No new septic systems are allowed within the City Limits and any existing systems will need to be removed upon demolition of the current home on the site.
G. Hazards and Hazardous Materials
SETTING AND DESCRIPTION
Hazardous Materials
A substance may be considered hazardous due to a number of criteria, including toxicity, ignitability, corrosivity, or reactivity. The term “hazardous material” is defined in law as any material that, because of quantity, concentration, or physical, or chemical characteristics, poses a significant present or potential hazard to human health and safety or to the environment.
Wildland and Urban Fire Hazards
Both urban and wildland fire hazard potential exists in the City of Merced and surrounding areas, creating the potential for injury, loss of life, and property damage. Urban fires primarily involve the uncontrolled burning of residential, commercial, or industrial structures due to human activities. Wildland fires affect grassland, brush or woodlands, and any structures on or near these fires. Such fires can result from either human made or natural causes.
Urban fires comprise the majority of fires in the City of Merced . The site is adjacent to undeveloped ag land which could be a source for a wildland fire. However, the City of Merced Fire Department has procedures in place to address the issue of wildland fires, so no additional mitigation would be necessary.
Initial Study #22-32
Airport Safety
The City of Merced is impacted by the presence of two airports -Merced Regional Airport, which is in the southwest corner of the City, and Castle Airport (the former Castle Air Force Base) , located approximately eleven miles northwest of the subject site.
The continued operation of the Merced Regional Airport involves various hazards to both flight (physical obstructions in the airspace or land use characteristics which affect flight safety) and safety on the ground (damage due to an aircraft accident). Growth is restricted around the Regional Airport in the southwest corner of the City due to the noise and safety hazards associated with the flight path.
Castle Airport also impacts the City. Portions of the northwest part of the City’s SUDP/SOI and the incorporated City are within Castle’s safety zones. The primary impact is due to noise (Zones C and D), though small areas have density restrictions (Zone B2). The military discontinued operations at Castle in 1995. One important criterion for determining the various zones is the noise factor. Military aircraft are designed solely for performance, whereas civilian aircraft have extensive design features to control noise.
Potential hazards to flight include physical obstructions and other land use characteristics that can affect flight safety, which include: visual hazards such as distracting lights, glare, and sources of smoke; electronic interference with aircraft instruments or radio communications; and uses which may attract flocks of birds. In order to safeguard an airport's long- term usability, preventing encroachment of objects into the surrounding airspace is imperative.
According to the Merced County Airport Land Use Compatibility Plan, the project site is not located in any restricted saf ety zones for either airport, and no aircraft overflight, air safety, or noise concerns are identified.
Railroad
Hazardous materials are regularly shipped on the BNSF and SP/UP Railroad lines that pass through the City. While unlikely, an incident involving the derailment of a train could result in the spillage of cargo from the train in transporting. The spillage of hazardous materials could have devastating results. The City has little to no control over the types of materials shipped via the rail lines. There is also a safety concern for pedestrians along the tracks and vehicles utilizing at-grade crossings. The design and operation of at -grade crossings allows the City some control over rail - related hazards. Ensuring proper gate operation at the crossi ngs is the most effective strategy to avoid collision and possible derailments. The Atishon Topeka and Santa Fe Railroad is approximately 1 mile from the site and Union Pacific Railroad is over 2 miles away.
Public Protection and Disaster Planning
Hospitals, ambulance companies, and fire districts provide medical emergency services.
Considerable thought and planning have gone into efforts to improve responses to day -to-day emergencies and planning for a general disaster response capability.
The City’s Emergency Plan and the County Hazardous Waste Management Plan both deal with detailed emergency response procedures under various conditions for hazardous material spills.
The City also works with the State Department of Health Services to establish cleanup plans and to monitor the cleanup of known hazardous waste sites within the City.
Initial Study #22-32
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
G. Hazards and Hazardous Materials.
Would the Project:
1) Create a significant hazard to the public or the
environment through the routine transport, use,
or disposal of hazardous materials?
2) Create a significant hazard to the public or the
environment through reasonably foreseeable
upset and accident conditions involving the
release of hazardous materials into the
environment?
3) Emit hazardous emissions or handle hazardous
or acutely hazardous materials, substances, or
waste within one-quarter mile of an existing or
proposed school?
4) Be located on a site which is included on a list
of hazardous materials sites compiled pursuant
to Government Code Section 65962.5 and, as a
result, would it create a significant hazard to the
public or the environment?
5) For a project located within an airport land use
plan or, where such a plan has not been adopted,
within two miles of a public airport or public
use airport, would the project result in a safety
hazard for people residing or working in the
project area?
6) For a project within the vicinity of a private
airstrip, would the project result in a safety
hazard for people residing or working in the
project area?
7) Impair implementation of or physically
interfere with an adopted emergency response
plan or emergency evacuation plan?
8) Expose people or structures to a significant risk
of loss, injury, or death involving wildland
fires, including where wildlands are adjacent to
urbanized areas or where
residences are
intermixed with wildlands?
1) Less-Than-Significant Impact
Construction activities associated with the proposed project would involve the use, storage, transport, and disposal of oil, gasoline, diesel fuel, paints, solvents, and other hazardous materials. The Project would be required to adhere to all applicable federal and state health Initial Study #22-32
and safety standards. Construction activity must also be in compliance with the California Occupational Safety and Health Administration regulatio ns (Occupational Safety and Health Act of 1970). Compliance with these requirements would reduce the risk of hazards to the public to a less-than-significant level.
2) Less-Than-Significant Impact
Construction on the project site would be reviewed for the use of hazardous materials at the building permit stage. Implementation of Fire Department and Building Code regulations for hazardous materials, as well as implementation of federal and state requirements, would reduce any risk caused by a future use on the site from haz ardous materials to a less than-significant-level.
A
PPLICABLE GENERAL PLAN GOALS AND POLICIES
The City of Merced Vision 2030 General Plan contains policies that address hazardous materials.
Goal Area S-7: Hazardous Materials
Goal: Hazardous Materials Safety for City Residents
Policies
S-2.1
Prevent injuries and environmental contamination due to the uncontrolled release of hazardous materials.
Implementing Actions:
7.1.a
Support Merced County in carrying out and enforcing the Merced County Hazardous Waste Management Plan.
7.1.b
Continue to update and enforce local ordinances regulating the permitted use and storage of hazardous gases, liquids, and solids.
7.1.d Provide continuing training for hazardous materials enforcement and response personnel.
3) Less-Than-Significant Impact
The nearest school is Pioneer Elementary School, located on the southwest corner of E.
Gerard Avenue and S. Coffee Street. The subject site is about 400 feet of this school. There are no other existing or proposed schools within ¼ mile of the site. Given the California Building Code protective measures required during the construction process, this developments impacts would be less than significant. Post -construction the site would be used for dwelling purposes only.
4) Less-Than-Significant Impact
No project actions or operations would result in the release of hazardous materials that could affect the public or the environment, and no significant hazard to the public or the environment would result with project implementation. This potential impact is less than significant.
Initial Study #22-32
5) Less-Than-Significant Impact
The project site is located about four miles of the Merced Regiona l Airport . The approximate 10- acre site is surrounded by existing residential uses or reserved for residential purposes. Given the land use designation and surrounding land use, the potential impact is less than significant.
6) Less-Than-Significant Impact
The closest private airstrip to the site is approximately 9 miles away. There would be no hazard to people living or working on the project site. 7) Less-Than-Significant Impact
The proposed project will not adversely affect any adopted emergency response plan or emergency evacuation plan. No additional impacts would result from the development of the project area over and above ` those already evaluated by the EIR prepared for the Merced Vision 2030 General Plan.
A
PPLICABLE GENERAL PLAN GOALS AND POLICIES:
The Merced Vision 2030 General Plan contains policies that address disaster preparedness.
Goal Area S-1: Disaster Preparedness
Goal: General Disaster Preparedness
Policies
S-1.1
Develop and maintain emergency preparedness procedures for the City.
Implementing Actions:
1.1.a
Keep up-to-date through annual review the City’s existing Emergency Plan and coordinate with the countywide Emergency Plan.
1.1.b
Prepare route capacity studies and determine evacuation procedures and routes for different types of disasters, including means for notifying residents of a need to evacuate because of a severe hazard as soon as possible.
7.1.d Provide continuing training for hazardous materials enforcement and response personnel.
8) Less-Than-Significant Impact
According to the EIR prepared for the Merced Vision 2030 General Plan, the risk for wildland fire within the City of Merced is minimal. According to the Cal Fire website, the Merced County Fire Hazard Severity Zone Map shows the project site is designated as a “Local Responsibility Area” (LRA) with a Hazard Classification of “LRA Unzoned.” The City of Merced Fire Department is the responsible agency for responding to fires at the subject site. The project site is served by Station #54 located on 1425 E. 21 st Street
(approximately 1.5 miles from the project site).
The site is not near agricultural land that could be susceptible to wildland fires. The City of Merced Fire Department has procedures in place to address the issue of wildland fires, Initial Study #22-32
so no additional mitigation would be necessary. This potential impact is less than significant.
H. Hydrology and Water Quality
SETTING AND DESCRIPTION
Water Supplies and Facilities
The City’s water supply system consists of 22 wells and 14 pumping stations equipped with variable speed pumps that attempt to maintain 45 to 50 psi (pounds per square inch) nominal water pressure. The City is required to meet State Health pressure requirements, which call for a minimum of 20 psi at every service connection under the annual peak hour condition and maintenance of the annual average day demand plus fire flow, whichever is stricter. The project site would be serviced by the extension of Capella Drive.
Storm Drainage/Flooding
In accordance with the adopted City of Merced Standard Designs of Common Engineering Structures, percolation/detention basins are designed to temporarily collect runoff so that it can be metered at acceptable rates into canals and streams that have limited capacity. The project would be required to adhere to the Post Construction Standards for compliance with the City’s Phase II MS4 permit issued by the state of California.
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
H. Hydrology and Water Quality.
Would the Project:
1) Violate any water quality standards or waste
discharge requirements?
2) Substantially deplete groundwater supplies or
interfere substantially with groundwater
recharge such that there would be a net deficit
in aquifer volume or a lowering of the local
groundwater table level (e.g., the production
rate of pre-existing nearby wells would drop to
a level which would not support existing land
uses or planned uses for which permits have
been granted)?
3) Substantially alter the existing drainage pattern
of the site or area, including through the
alteration of the course of a stream or river, in a
manner which would result in substantial
erosion or siltation on or offsite?
Initial Study #22-32
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
4) Substantially alter the existing drainage pattern
of the site or area, including through the
alteration of the course of a stream or river, or
substantially increase the rate or amount of
surface runoff in a manner which would result
in flooding on or offsite?
5) Create or contribute runoff water which would
exceed the capacity of existing or planned
storm water drainage systems or provide
substantial additional sources of polluted
runoff?
6) Otherwise substantially degrade water quality?
7) Place housing within a 100 -year flood hazard
area as mapped on a federal Flood Hazard
Boundary or Flood Insurance Rate Map or other
flood hazard delineation map?
8) Place within a 100 -year flood hazard area
structures which would impede or redirect flood
flows?
9) Expose people or structures to a significant risk
of loss, injury, or death involving flooding,
including flooding as a result of the failure of a
levee or dam?
10) Inundation by seiche, tsunami, or mudflow?
1) Less-Than-Significant Impact
The P roject is not expected to violate any water quality standards or waste discharge requirements during construction or operation. In addition to compliance with standar d construction provisions, the Project shall be required to comply with the Merced Storm Water Master Plan and the Storm Water Management Plan, and obtain all required permits for water discharge. During project operations, the City has developed requirements to minimize the impact to storm water quality caused by development and redevelopment.
The increase in impervious areas caused by development can cause an increase in the type and quantity of pollutants in storm water runoff. Prior planning and design to minimize pollutants in runoff from these areas is an important component to storm water quality management. These standards are set forth in the City’s Post-Construction Standards Plan and provide guidance for post -construction design measures to ensure that storm water quality is maintained. Compliance with these requirements and permits would reduce the impact to a less than significant level.
A
PPLICABLE GENERAL PLAN GOALS AND POLICIES:
The Merced Vision 2030 General Plan contains policies that address Water Quality and Storm Drainage.
Initial Study #22-32
Goal Area P-5: Storm Drainage and Flood Control
Goal: An Adequate Storm Drainage Collection and Disposal System in Merced Policies
P-5.1
Provide effective storm drainage facilities for future development.
P-5.2 Integrate drainage facilities with bike paths, sidewalks, recreation facilities, agricultural activities, groundwater recharge, and landscaping.
Implementing Actions:
5.1.a
Continue to implement the City’s Storm Water Master Plan and the Storm Water Management Plan and its control measures.
5.1.c Continue to require all development to comply with the Storm Water Master Plan and any subsequent updates.
2) Less-Than-Significant Impact
The City of Merced is primarily dependent on groundwater sources that draw from the San Joaquin aquifer. The City has 22 active well sites with one under construction, and 14 pumping stations, which provide service to meet peak hour urban level conditions and the average daily demand plus fire flows.
According to the City of Merced Water Master Plan, the estimated average peak water demand is 23.1 mgd.
The proposed project is estimated to use approximately 2,500 gallons of water per day.
This would represent 0.0078% of the estimated average daily water consumption.
Although development of the site would restrict onsite recharge where new impervious surface areas are created, all alterations to groundwater flow would be captured and routed to the storm water percolation ponds or pervious surfaces with no substantial net loss in recharge potential anticipated. This reduces this impact to a less-than-significant level. 3) Less-Than-Significant Impact
The proposed project would result in modifications to the existing drainage pattern on the site. If required by the City’s Engineering Department, the project will be designed to capture all surface water runoff onsite and then drain into the City’s existing storm drainage system.
The project site is currently vacant and consists of pervious surfaces. The proposed project would create impervious surfaces over a large portion of the project site, thereby preventing precipitation from infiltrating and causing it to pond or runoff. However, stormwater flows would be contained onsite and piped or conveyed to the City’s stormwater system , there would be no potential for increased erosion or sedimentation.
Developed storm drainage facilities in the area are adequate to handle this minor increase in flows. The Project would not result in a substantial alteration of drainage in the area, and no offsite uses would be affected by the proposed changes. All potential impacts are less than significant.
Initial Study #22-32
4) Less-Than-Significant Impact
The proposed project would alter the existing drainage pattern of the site , but not in a manner that would result in flooding. The site is currently mostly vacant and any construction on the site would alter the drainage pattern and reduce the absorption capability of the site . There are no streams or rivers that would be affected. All storm runoff would be captured onsite and conveyed through pipes to the City’ s stormwat er system. Any changes to the site would drain into the City’s existing storm drain system which would prevent any onsite or offsite flooding. This potential impact is less than significant.
5) Less-Than-Significant Impact
Construction on the site will drain into the City’s existing storm drain system. The developer would be required to provide documentation showing the capacity exists within the existing lines and basin to serve this project.
6) Less-Than-Significant Impact
The proposed project would not substantially degrade water quality. The proposed project would be served by the City’s water system and all water run off will be contained onsite then directed out to the City’s storm drain system. The construction of the project would not affect the water quality and would not degrade water quality in the area. This potential impact is less than significant.
7) Less-Than-Significant Impact
The project would be required to comply with flood- related regulations, including submitting a flood elevation certificate to the City’s Building Department during the building permit process. This potential impact is less than significant. 8) Less-Than-Significant Impact
The Flood Insurance Rate Map shows the project within a Zone “AO,” limited flood hazard area. As required with all new construction, the project would be required to comply with all requirements of the California Building Code (CBC) to ensure construction of the buildings meets the minimum requirements set forth by the CBC and the requirements of Flood Zone “AO.” Therefore, there are no significant impacts. 9) Less-Than-Significant Impact
The proposed project would not expose people or structures to a significant risk of loss, injury, or death involving flooding, including flooding as a result of the failure of a levee or dam. According to Figure 11.3 of the Merced Vision 2030 General Plan, the project site is outside the inundation area of the Yosemite Lake Dam and the Bear Reservoir Dam.
In the case of dam failure, the General Plan Safety Element addresses local hazard response procedures. This potential impact is less than significant. 10) Less-Than-Significant Impact
The proposed project is located approximately 80 miles from the Pacific Ocean, distant from any large lakes, and not within the inundation zones for Lake Yosemite or Bear Reservoir at an elevation ranging from approximately 173 feet above MSL. According to Initial Study #22-32
the City’s General Plan Safety Element, the City of Merced is not subject to inundation by tsnami, seiche, or mudflow. This potential impact is less than significant.
I. Land Use and Planning
SETTING AND DESCRIPTION
The project site is located within the City Limits of Merced and within its Specific Urban Development Plan and Sphere of Influence (SUDP/SOI).
S
URROUNDING USES
Refer to Page 2 of this Initial Study and the map at Attachment A for the surrounding land uses.
Current Use
The project site is approximately 10 acres of mostly undeveloped land located on the west side of S. Coffee Street, 400 feet north of E. Gerard Avenue.
The project site is currently reserved Urban Transition, which would allow the existing single - family home and the continued land use policy in place when this site was in County jurisdiction.
The proposed land use amendment would increase residential density to 4.5 units per acre, which is within the allowable range of 2 to 6 dwelling units per acre for the existing General Plan designation of Low Density Residential (LDR).
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
I. Land Use and Planning.
Would the Project:
1) Physically divide an established community?
2) Conflict with any applicable land use plan,
policy, or regulation of an agency with
jurisdiction over the project (including, but not
limited to, the general plan, specific plan, local
coastal program, or zoning ordinance) adopted
for the purpose of avoidi ng or mitigating an
environmental effect?
3) Conflict with any applicable habitat
conservation plan or natural community
conservation plan?
1) Less-Than-Significant Impact
The project site is within the boundaries of the Merced City Limits. It would not physically divide the community as it is already part of the City. The extension of Capella Drive would improve street connectivity for this neighborhood. This potential impact is less than significant.
Initial Study #22-32
2) Less-Than-Significant Impact
The project site is currently zoned Urban Transition, which would allow the existing single- family home and the continued land use policy in place when this site was in County jurisdiction. The proposed land use amendment would increase residential density to 4.5 units per acre, which is within the allowable range of 2 to 6 dwelling units per acre for the existing General Plan designation of Low Density Residential (LDR) . Therefore, this impact is less than significant.
3) No Impact
No Habitat Conservation Plans or Natural Community Conservation Plans have been adopted by the City of Merced. Therefore, there would be no impact.
J. Mineral Resources
SETTING AND DESCRIPTION
The City of Merced does not contain any mineral resources that require managed p roduction according to the State Mining and Geology Board. Based on observed site conditions and review of geological maps for the area, economic deposits of precious or base metals are not expected to underlie the City of Merc ed or the project site . According to the California Geological Survey, Aggregate Availability in California - Map Sheet 52, minor aggregate production occurs west and north of the City of Merced, but economic deposits of aggregate minerals are not mined within the immediate vicinity of the SUDP/SOI. Commercial deposits of oil and gas are not known to occur within the SUDP/SOI or immediate vicinity.
According to the Merced County General Plan Background Report (June 21, 2007), very few traditional hard rock mines exist in the C ounty. The County’s mineral resources are almost all sand and gravel mining operations. Approximately 38 square miles of Merced County, in 10 aggregate resource areas (ARA), have been classified by the California Divisi on of Mines and Geology for aggregate. The 10 identified resource areas contain an estimated 1.18 billion tons of concrete resources with approximately 574 million tons in Western Merced County and approximately 605 million tons in Eastern Merced County. Based on available production data and population projections, the Division of Mines and Geology estimated that 144 million tons of aggregate would be needed to satisfy the projected demand for construction aggregate in the County through the year 2049. The available supply of aggregate in Merced County substantially exceeds the current and projected demand.
Initial Study #22-32
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
J. Mineral Resources. Would the Project:
1) Result in the loss of availability of a known
mineral resource that would be of value to
the region and the residents of the state?
2) Result in the loss of availability of a locally-
important mineral resource recovery site
delineated on a local general plan, specific
plan, or other land use plan?
1) No Impact
No mineral resources occur with in City Limits, SUDP/SOI, or within the project site, so no impact.
2) Less-Than-Significant Impact
See #1 above.
K. Noise
SETTING AND DESCRIPTION
Potential noise impacts of the proposed project can be categorized as those resulting from construction and those from operational activities. Construction noise would have a short -term effect; operational noise would continue throughout the lifetime of the project. Construction associated with the development of the project would increase noise levels temporarily during construction. Operational noise associated with the development would occur intermittently with the continued operation of the proposed project.
Some land uses are considered more sensitive to noise levels than other uses. Sensitive land uses can include residences, schools, nursing home s, hospitals, and some public facilities, such as libraries. The noise level experienced at the receptor depends on the distance between the source and the receptor, the presence or absence of noise barriers and other shielding devices, and the amount of noise attenuation (lessening) provided by the intervening terrain. For line sources such as motor or vehicular traffic, noise decreases by about 3.0 to 4.5A –weighted decibels (dBA ) for every doubling of the distance from the roadway.
Noise from Other Existing Sources
Vehicular noise from Coffee Street would be the primary existing noise source at the project site, in addition to noise generated by Pioneer Elementary School (400 feet south of subject site). The nearest railroad corridor is approximately 1 mile from the project s ite. The site is surrounded by various residential properties that generate operational noise on a daily basis. The are no industrial uses located within 1,000 feet of the project site.
Initial Study #22-32
According to the Merced Vision 2030 General Plan, noise exposure not exceeding 45 dB is considered to be a “normally acceptable” noise level for residential uses.
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
K. Noise. Would the Project result in:
1) Exposure of persons to or generation of noise
levels in excess of standards established in the
local general plan or noise ordinance, or
applicable standards of other agencies?
2) Exposure of persons to or generation of
excessive groundborne vibration or
groundborne noise levels?
3) A substantial permanent increase in ambient
noise levels in the project vicinity above levels
existing without the project?
4) A substantial temporary or periodic increase in
ambient noise levels in the project vicinity
above levels existing without the project?
5) For a project located within an airport land use
plan or, where such a plan has not been
adopted, within two miles of a public airport
or public use airport, would the project expose
people residing or working in the project area
to excessive noise levels?
6) For a project within the vicinity of a private
airstrip, would the project expose people
residing or working in the project area to
excessive noise levels?
1) Less Than Significant
Construction Noise
Construction of the Project would temporarily increase noise levels in the area during the construction period. Therefore, the noise from construction may be steady for a few months and then cease all together. Construction activities, including site preparation and grading, building construction, and sidewalk and street improvements would be considered an intermittent noise impact throughout the construction period. These activities could result in various effects on sensitive receptors, depending on the presence of intervening barriers or other insulating materials. The effects will be short term and would result in a less than significant impact.
Initial Study #22-32
Operational Noise
Operational noise would be the main noise source expected from the proposed project.
Traffic coming to and from the project site would generate the most nois e. However, the site is surrounded by other residential uses, which are generally expected to generate similar amount of noise as the proposed development. Implementation of the Project would not lead to continued offsite effects related to noise generated by the P roject. Given the noise from similar low impact zones near the subject site, this potential impact is less than significant.
2) Less-Than-Significant Impact
Implementation of the proposed project would not result in the generation of any ground borne vibration or noise. This is a less-than-significant impact. 3) Less-Than-Significant Impact
As noted above, limited operational noise would be expected from the proposed residential project. Any development on the site could be considered an increase in the ambient noise given the fact that the site is currently vacant. H owever, as explained previously, the site is within a residential area and surrounded by residential properties. The potential impacts of this project in the vicinity are less than significant. 4) Less-Than-Significant Impact
The project construction will cause temporary and periodic increases in the ambient noise levels. However, because the construction noise will only be temporary and the increase in noise generated from the site would be minimal, the impacts are less than significant. 5) Less-Than-Significant Impact
The project site is located within 4.5 mile from active areas of the Merced Regional Airport and approximately 10 miles from the Castle Airport. T he airstrip has a flight pattern that goes northwest/southeast, which may fly directly over the project site, however, given the distance between the project site and the airports , there should be less -than-significant impact. Given its location, the private airstrip should not pose a hazard to the project development. Therefore, no population working or living at the site would be exposed to excessive levels of aircraft noise. This potential impact is less than significant. 6) Less-Than-Significant Impact
See section #5 above.
L. Population and Housing
SETTING AND DESCRIPTION
The Project includes the construction of 45 single -family residential units on 45 lots, with two additional lots for a basin and a tot lot.
Initial Study #22-32
Expected Population and Employment Growth
According to the State Department of Finance population estimates for 2022, the City of Merced’s population was estimated to be 89,058. Population projections estimate that the Merced SUDP area will have a significant population of 159,900 by the Year 2030.
According to the Merced Vision 2030 General Plan, the City of Merced is expected to experience significant population and employment growth by the Year 2030.
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
L. Population and Housing.
Would the Project:
1) Induce substantial population growth in an area
either directly (for example, by proposing new
homes and businesses) or indirectly (for
example, through extension of roads or other
infrastructure)?
2) Displace substantial numbers of existing
housing, necessitating the construction of
replacement housing elsewhere?
3) Displace substantial numbers of people,
necessitating the construction of replacement
housing elsewhere?
1) Less-Than-Significant Impact
The project site has a General Plan designation of Low Density Residential which would allow between 2 and 6 dwelling units per acre. The proposed Zone Change from Urban Transition (which allows agriculture uses) to Low Density Residential would increase residential density to 4 .5 units per acre, for a total of 45 units. Based on th e proposed density being within an allowable range for the site’s General Plan de signation, and need to increase housing supply, this potential impact would be less than significant. 2) Less-Than-Significant Impact
The proposal would increase housing supply by 44 residential units, resulting in less-than- significant impact.
3) No Impact
The project site is mostly undeveloped, with one 1 unit on this approximate 10-acre site.
No significant housing would be displaced as a result of this project. Therefore, the impact is less than significant.
Initial Study #22-32
M. Public Services
SETTING AND DESCRIPTION
Fire Protection
The City of Merced Fire Department provides fire protection, rescue, and emergency medical services from five fire stations throughout the urban area. Fire Station #54 is located at 1425 E. 21 st Street, approximately 1.5 miles from the site. This Station would serve the proposed project.
A proposed new station in the proximity of Gerard Avenue and Coffee Street will likely be constructed in the next 10 years, which would be much closer to the project site.
Police Protection
The City of Merced Police Department provides police protection for the entire City. The Police Department employs a mixture of sworn officers, non- sworn officer positions (clerical, etc.), and unpaid volunteers (VIP). The service standard used for planning future police facilities is approximately 1.37 sworn officers per 1,000 population, per the Public Facilities Financing Plan.
Schools
The public school system in Merced is served by three districts: 1) Merced City School District (elementary and middle schools); 2) Merced Union High School District (MUHSD); and, 3) Weaver Union School District (serving a small area in the southeastern part of the City with elementary schools). The districts include various elementary schools, middle (junior high) schools, and high schools.
As the City grows, new schools will need to be built to serve our growing population. According to the Development Fee Justification Study for the MUHSD, Merced City Schools students are generated by new development at the following rate:
Table 6 Student Generation Rates
Commercial/Industrial
Category
Elementary (K-8)
(Students per 1,000 sq.ft.)
High School (9-12)
(Students per 1,000 sq.ft.)
Retail 0.13 0.038
Restaurants 0.00 0.157
Offices 0.28 0.048
Services 0.06 0.022
Wholesale/Warehouse 0.19 0.016
Industrial 0.30 0.147
Multi-Family 0.559 (per unit) 0.109 (per unit)
Based on the table above, the 45 units would generate 24 K-8 students and 4.5 high school students.
Initial Study #22-32
1) Less Than Significant
a) Fire Protection
The project site would be served by Fire Station #54, located at 1425 E. 21 st Street
(approximately 1.5 mile from the project site). The response from this station would meet the desired response time of 4 to 6 minutes, citywide, 90 percent of the time, within the financial constraints of the City. The proposed change in land use designation would not affect fire protection services, and no new or modified fire facilities would be needed. Any changes to the building or site would be required to meet all requirements of the California Fire Code and the Mer ced Municipal Code. Compliance with these requirements would reduce any future impacts to a less than significant level.
At the time a building permit is issued, the developer would be required to pay Public Facility Impact Fees (PFIF). A portion of this fee goes to cover the cit y’s costs for fire protection such as fire stations, etc. In addition, the developer may be required to annex into the City’s Community Facilities Dis trict for Services. This would result in an assessment paid with property taxes in which a portion of the tax would go to pay for fire protection services. Compliance with all Fire, Building, and Municipal Code requirements
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
M. Public Services. Would the Project:
1) Result in substantial adverse physical impacts
associated with the provision of new or
physically altered governmental facilities, need
for new or physically altered governmental
facilities, the construction of which could cause
significant environmental impacts, in order to
maintain acceptable service ratios, response
times or other performance objectives for any
of the following public services:
a) Fire Protection?
b) Police Protection?
c) Schools?
d) Parks?
e) Other Public Facilities?
Initial Study #22-32
as well as payment of the Public Facility Impact Fees, and annexation into the City’s CFD for services would reduce any potential impacts to a less than significant level. b) Police Protection
The site would be served by the City Police Department. The development of the vacant project site could result in more calls to the site. Implementation of the proposed project would not require any new or modified police facilities.
The same requirements for paying Public Facility Impact Fees and potentially annexation into the City’s Community Facilities Dist rict for Services would apply with a portion of the fees and taxes collected going toward the costs for police protection. Therefore, this potential impact is reduced to a less-than-significant level. c) Schools
The project site is located within the boundaries of the Weaver Unified School District and Merced Union High School District. Based on the table and discussion provided in the “Settings and Description” section above, the proposed development would likely generate additional students to the school system. As appropriate, the developer would be required to pay all fees due under the Leroy F. Greene School Facilities Act of 1988. Once these fees are paid, the satisfaction of the developer of his statutory fee under California Government Code §65995 is deemed “full and complete mitigation” of school impacts.
This potential impact is less than significant.
d) Parks
Dwight Amey Neighborhood Park is located 0.35 miles east of the site. Th is housing development would slightly increase the use of neighborhood or regional parks.
Payment of the fees required under the Public Facilities Financing Program (PFIF) as described above would be required at time of building permit issuance to help fund future parks and maintenance of existing parks would be required at the building permit stage .
The proposed amenities onsite and the payment of fees would reduce this potential impact to less than significant.
e) Other Public Facilities
The development of the Project could impact the maintenance of public facilities and could generate impacts to other governmental services. Payment of the fees required under the Public Facilities Financing Program (PFIF) as described above would mitigate these impacts to a less than significant level.
N. Recreation
SETTING AND DESCRIPTION
The City of Merced has a well-developed network of parks and recreation facilities. Several City parks and recreation facilities are located within a one-mile radius of the project site.
Initial Study #22-32
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
N. Recreation. Would the Project:
1) Increase the use of neighborhood and regional
parks or other recreational facilities such that
substantial physical deterioration of the facility
would occur or be accelerated?
2) Does the project include recreational facilities
or req uire the construction or expansion of
recreational facilities which might have an
adverse physical effect on the environment?
1) Less the Significant Impact
Development of the P roject may increase the use of neighborhood or regional parks.
However, payment of the required development fees at the building permit stage along with the amenities on site would reduce the potential impacts to a less than significant level. 2) No Impact
The P roject is not responsible for the construction or expansion of any recreational facilities.
O. Transportation/Traffic
SETTING AND DESCRIPTION
For additional information see Appendix A at Attachment C for combined studies on Air Quality, Green House Gas Emissions, and Vehicle Miles Traveled.
Roadway System
The project site is located in southeast Merced, approximately two and a half miles southeast of Downtown and half a mile north of Highway 99. The project site consists of a mostly undeveloped lot (with 1 home) totaling approximately 10 acres. The project site is bounded by local roads, with the nearest north-south road being S. Coffee Street, and the nearest east-west road being Gerard Avenue. S. Coffee S treet connects with Gerard Avenue and E. Childs Avenue, which are considered a Major Arterial Road and designed to carry large volumes of traffic traversing through a large portion of the community. These arterial roads connect with Highway 99 that connect s Merced with other regional communities throughout the State.
Initial Study #22-32
Transit Service
The Transit Joint Powers Authority for Merced County has jurisdiction over public transit in Merced County and operates The Bus. The Bus provides transportation for residents traveling within Merced and outside the City within neighboring communities such as Planada, Atwater, and Livingston.
Vehicle Miles Traveled
Senate Bill (SB) 743 directs the Governor’s Office of Planning and Research (OPR) to develop new guidelines for assessing transportation- related impacts that “promote the reduction of greenhouse gas emissions, the development of multimodal transportation networks, and a diversity of land uses” (Public Resources Code Section 21099[b][1]). These new guidelines will replace automobile delay, as described through level of service (LOS), with more appropriate criteria and metrics based on travel demand, such as “vehicle miles traveled, vehicle miles traveled per capita, automobile trip generation rates, or automobile trips generated” (Public Resources Code Section 21099[b][1]). The State CEQA Guidelines are expected to be amended to include guidance for measuring travel demand and to recommend that delays related to co ngestion no longer be considered a significant impact under CEQA (OPR 2016).
Vehicle Miles Traveled Analysis
Calculation of VMT shown in the CalEEMod output files in Appendix A, Section 4.0 Operational Detail – Mobile, 4.2 Trip Summary Information shows that the project’s annual VMT is 1,222.52 miles. This is unmitigated VMT and does not show reduction for location of the project to transportation, schools, connectivity, employment centers, and shopping.
The project is located within one mile of the E. Garard Avenue bus stop, and the bus route currently passes between East Childs and East Garard Avenues via South Coffee Street (M-5 Merced South- East bus route), which will provide the entrance to the project. The project is located within 0.1 miles of the Pioneer Elementary School less than 1 mile from Golden Valley High School and Joe Herb Park, and is adjacent to an existing single-family residential subdivisions. The project would be connected to the adjacent subdivision via roadway with sidewalks, which would provide easy access to transport and other amenities. The project is located within 3.5 miles of the C ity center where the majority of employers are located. Shopping centers and markets are located throughout Merced, within a distance of three miles from the project site.
The CalEEMod trip generation (Institute of Transportation Engineers (ITE), Trip Generation Manual, 10
th Edition) provides for trip lengths of for home to work as 10.8-mile, home to shop as
7.3-miles, and home to other (schools, recreation) as 7.5- miles. As shown above the distance to from home to work, home to shopping, and home to schools is less than half these default distance provided by the ITE; therefore, given the location of the project, it is expected to reduce VMT by more 50 percent.
Initial Study #22-32
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
P. Transportation/Traffic.
Would the project:
1) Conflict with adopted policies, plans, or
programs regarding public transit, bicycle,
or pedestrian facilities, or otherwise
decrease the performance or safety of such
facilities?
2) Would the project conflict or be
inconsistent with CEQA Guidelines
Section 15064.3 subdivision (b)?
3) Substantially increase hazards due to a
design feature (e.g. sharp curves or
dangerous intersections) or incompatible
uses (e.g. farm equipment)?
4) Result in inadequate emergency access?
1) Less-than-Significant Impact
The approximate 10- acre subject site currently has 1 home, but the General Plan designation of Low Density Residential allows between 2 and 6 dwelling units per acre, permitting a maximum of 60 residential units within the subject site. The proposed 45 units is within the General Plan allowed 60 residential units . The existing street network could adequately serve this proposal. According to Trip Generation (ITE Report) , the average daily trips per unit is 6.59. At 45 units, that would total 296.55 trips per day, and at the General Plan maximum of 60 units it would total 395.4 trips per day which would mean that the proposed subdivision is only producing 75% of the traffic planned for the subject site. This would result in a less than significant impact. 2) Less-than-Significant Impact
The project would be constructed in an existing residential area on undeveloped land.
Given the minimal increase in residential units (4 additional units ), the project would not result in a change in air traffic patterns, including air traffic associated with any airports.
The increase in density would result in slightly more vehicle miles traveled to surrounding Initial Study #22-32
uses such as Tenay a Middle School, Margaret Sheehy Elementary, McNamara Par k, and Golden Valley Health Centers.
Per CEQA Guidelines Section 15064.3 alternative modes of transportation are being assessed. The project is located within one mile of the E. Garard Avenue bus stop, and the bus route currently passes between East Childs and East Garard Avenues via South Coffee Street (M-5 Merced South-East bus route), which will provide the entrance to the project.
The Amtrak (passenger train service) is located within 2.5 miles providing services to the greater California area and connections to travel across the county. The closest airport is Merced Regional Airport, located approximately 3 miles to the east. 3) No Impact
The project site is surrounded by developed subdivisions that are missing road connections.
The proposed subdivision would extend some of the existing roads in Capella Drive and install missing infrastructure along S. Coffee Street. The proposal does not require changes to the existing street network. Therefore, no impact would occur. 4) Less-than-Significant Impact
The subject site is an approximate 10- acre parcel on mostly undeveloped land in a neighborhood being developed with newer subdivisions to the east and west of the subject site. There is currently a gap missing infrastructure of roads and utilities between the subdivisions to the east and west. This entire area has a General Plan designation of single- family homes within the range proposed by the developer. Approving this subdivis ion would connect the east and west subdivision via road extensions and utility installation.
These road connections would improve the street network within the neighborhood and improve emergency access to the site or surrounding uses, as the project would have a less- than-significant impact on the roadway routes serving the neighborhood. Therefore, project construction and operation would not pose a significant obstacle to emergency response vehicles. This impact on emergency access would be less than significant.
SETTING AND DESCRIPTION
Water
The City’s water system is composed of 22 groundwater production wells located throughout the City, and approximately 350 miles of main lines. Well pump operators ensure reliability and adequate system pressure at all times to satisfy customer demand. Diesel powered generators help maintain uninterrupted operations during power outage s. The City of Merced water system delivers more than 24 million gallons of drinking water per day to approximately 20,733 residential, commercial, and industrial customer locations. The City is required to meet State Health pressure requirements, which call for a minimum of 20 psi at every service connection under the annual peak hour condition and maintenance of the annual average da ily demand plus fire flow, whichever is stricter. The City of Merced Water Division is operated by the Public Works Department.
Initial Study #22-32
The City of Merced’s wells have an average depth of 414 feet and range in depth from 161 feet to 800 feet. The depth of these wells would suggest that the City of Merced is primarily drawing water from a deep aquifer associated with the Mehrten geologic al formation. Increasing urban demand and associated population growth, along with an increased shift by agricultural users from surface water to groundwater and prolonged drought have resulted in declining groundwater levels due to overdraft. This condition was recognized by the City of Merced and the Merced Irrigation District (MID) in 1993, at which time the two entities began a two-year planning process to ensure a safe and reliable water supply for Eastern Merced County through the year 2030. Integrated Regional Water Planning continues today through various efforts.
Wastewater
Wastewater (sanitary sewer) collection and treatment in the Merced urban area is provided by the City of Merced. The wastewater collection system handles wastewater generated by residential, commercial, and industrial uses in the City.
The City Wastewater Treatment Plant (WWTP), located in the southwes t part of the City about two miles south of the airport, has been periodically expanded and upgraded to meet the needs of the City’s growing population and new industry. The City’s wastewater treatment facility has a capacity of 11.5 million gallons per d ay (mgd); with an average flow of 8.5 mgd. The City has recently completed an expansion project to increase capacity to 12 mgd and upgrade to tertiary treatment with the addition of filtration and ultraviolet disinfection. Future improvements would add another 8 mgd in capacity (in increments of 4 mgd), for a total of 20 mgd. This design capacity can support a population of approximately 174,000. The collection system will also need to be expanded as development occurs.
Treated effluent is disposed of in several ways depending on the time of year. Most of the treated effluent (75% average) is discharged to Hartley Slough throughout the year. The remaining treated effluent is delivered to a land application area and the on- site City-owned wetland area south of the treatment plant.
Storm Drainage
The Draft City of Merced Storm Drainage Master Plan addresses the collection and disposal of surface water runoff in the City’s SUDP. The study addresses both the collection and disposal of storm water. Systems of storm drain pipes and catch basins are laid out, sized, and costed in the plan to serve present and projected urban land uses.
It is the responsibility of the developer to ensure that utilities, including storm water and drainage facilities, are installed in compliance with City regulations and other applicable regulations.
Necessary arrangements with the utility companies or other agencies will be made for such installation, according to the specifications of the governing agency and the City [ (Ord. 1342 § 2 (part), 1980: prior code § 25.21(f)).] The disposal system is mainly composed of MID facilities, including water distribution canals and laterals, drains, and natural channels that traverse the area.
The City of Merced has been involved in developing a Storm Water Managem ent Plan (SWMP) to fulfill requirements of storm water discharges from Small Municipal Separate Storm Sewer System (MS4) operators in accordance with Section 402(p) of the Federal Clean Water Act (CWA). The SWMP was developed to also comply with General P ermit Number CAS000004, Water Quality Order No. 2003-0005-DWQ.
Initial Study #22-32
Solid Waste
The City of Merced is served by the Highway 59 Landfill and the Highway 59 Compost Facility, located at 6040 North Highway 59. The County of Merced is the contracting agency for la ndfill operations and maintenance, as the facilities are owned by the Merced County Association of Governments. The City of Merced provides services for all refuse pick- up within the City limits and franchise hauling companies collect in the unincorporated areas. In addition to these two landfill sites, there is one private disposal facility, the Flintkote County Disposal Site, at SR 59 and the Merced River. This site is restricted to concrete and earth material.
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
P. Utilities and Service Systems.
Would the Project:
1) Exceed wastewater treatment requirements of
the applicable Regional Water Quality Control
Board?
2) Require or result in the construction of new
water or wastewater treatment facilities or
expansion of existing facilities, the construction
of which could cause significant environmental
effects?
3) Require or result in the construction of new
storm water drainage facilities or expansion of
existing facilities, the construction of which
could cause significant environmental effects?
4) Have sufficient water supplies available to
serve the project from existing entitlements and
resources, or are new or expanded entitlements
needed?
5) Result in a determination by the wastewater
treatment provider which serves or may serve
the project that it has adequate capacity to serve
the project’s projected demand in addition to
the provider’s existing commitments?
6) Be served by a landfill with sufficient permitted
capacity to accommodate the project’s solid
waste disposal needs?
7) Comply with federal, state, and local statutes
and regulations related to solid waste?
Initial Study #22-32
1) Less Than Significant Impact
The project site would be served by City sewer system . There is sufficient capacity for serving this project within the City of Merced. This potential impact is less than significant. 2) Less Than Significant Impact
The City’s current water and wastewater system is capable of handling this project within the City of Merced. There is are existing sewer and water lines along Capella Drive, which would be extended to go through the project site . N o significant environmental impacts would result from connecting to the line. This potential impact is less than significant. 3) Less Than Significant Impact
No new facilities or expansions of existing facilities are needed. This potential impact is less than significant.
4) Less Than Significant Impact
As explained above, no new water facilities are needed for this project. The existing water system is sufficient to serve the development. Potential impacts are less than significant. 5) Less Than Significant Impact
Refer to item 2 above.
6) Less Than Significant Impact
The City of Merced uses the Highway 59 Landfill. Sufficient capacity is available to serve the future project. According to the Merced Vision 2030 General Plan DEIR, the landfill has capacity to serve the City through 2030. Potential impacts are less than significant. 7) Less Than Significant Impact
All construction on the site would be required to comply with all local, state, and federal regulations regarding solid waste, including recycling. Potential impacts are less than significant.
Initial Study #22-32
P. Mandatory Findings of Significance
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
P. Mandatory Findings of Significance.
Would the Project:
1) Have the potential to degrade the quality of
the environment, substantially reduce the
habitat of a fish or wildlife species, cause a
fish or wildlife population to drop below
self-sustaining levels, threaten to eliminate
a plant or animal community, reduce the
number or restrict the range of a rare or
endangered plant or animal or eliminate
important examples of the major periods of
California history or prehistory?
2) Have impacts that are individually limited,
but cumulatively considerable?
(“Cumulatively considerable” means that
the incremental effects of a project are
considerable when viewed in connection
with the effects of past projects, the effects
of other current projects, and the effects of
probably future projects?)
3) Have environmental effects which will
cause substantial adverse effects on human
beings, either directly or indirectly?
1) Less-Than-Significant Impact
As previously discussed in this document, the Project does not have the potential to adversely affect biological resources or cultural resources , because such resources are lacking on the project site, and any potential impacts would be avoided with implementation of the mitigation measures and other applicable codes identified in this report. Also, the Project would not significantly change the existing urban setting of the project area. Thus, this impact would be less than significant. 2) Less-Than-Significant Impact
The Program Environmental Impact Report conducted for the Merced Vision 2030 General Plan, the General Plan Program EIR (SCH# 2008071069) , has recognized that future development and build -out of the SUDP/SOI will result in cumulative and unavoidable impacts in the areas of Air Quality and Loss of Agricultural Soils. In conjunction with this Initial Study #22-32
conclusion, the City has adopted a Statement of Overriding Considerations for these impacts (Resolution #2011-63) which is herein incorporated by reference.
The certified General Plan EIR addressed and analyzed cumulative impacts resulting from changing agricultural use to urban uses. No new or unaddress ed cumulative impacts will result from the project that have not previously been considered by the certified General Plan EIR or by the Statement of Overriding Considerations, or mitigated by this Expanded Initial Study. This Initial Study does not disclose any new and/or feasible mitigation measures which would lessen the unavoidable and significant cumulative impacts.
The analysis of impacts associated with the development would contribute to the cumulative air quality and agricultural impacts identified in the General Plan EIR. In the case of air quality, emissions from the proposed project would be less than significant. The nature and extent of these impacts, however, falls within the parameters of impacts previously analyzed in the General Plan EIR. No individual or cumulative impacts will be created by the Project that have not previously been considered at the program level by the General Plan EIR or mitigated by this Initial Study.
3) Less-Than-Significant Impact
Development anticipated by the Merced Vision 2030 General Plan will have significant adverse effects on human beings. These include the incremental degradation of air quality in the San Joaquin Basin, the loss of unique farmland, the incremental increase in traffic, and the increased demand on natural resources, public services, and facilities. However, consistent with the provisions of CEQA previously identified, the analysis of the proposed project is limited to those impacts which are peculiar to the project site or which were not previously identified as significant effects in the prior EIR. The previously- certified General Plan EIR and the Statement of Overriding Considerations addressed those cumulative impacts; hence, there is no requirement to addr ess them again as part of this project.
This previous EIR concluded that these significant adverse impacts are accounted for in the mitigation measures incorporated into the General Plan EIR. In addition, a Statement of Overriding Considerations was adopted by City Council Resolution #2011- 63 that indicates that the significant impacts associated with development are offset by the benefits that will be realized in providing necessary jobs for residents of the City. The analysis and mitigation of impacts have been detailed in the Environmental Impact Report prepared for the Merced Vision 2030 General Plan, which is incorporated into this document by reference.
While this issue was addressed and resolved with the General Plan EIR in an abundance of caution, in order to fulfill CEQA’s mandate to fully disclose potential environmental consequences of projects, this analysis is considered herein. However, as a full disclosure document, this issue is repeated in abbreviated form for purposes of disclosure, even though it was resolved as a part of the General Plan.
Potential impacts associated with the Project’s development have been described in this Initial Study. All impacts were determined to be less than significant.
Initial Study #22-32
Q. Greenhouse Gas Emissions
For additional information see Appendix A at Attachment C for combined studies on Air Quality, Green House Gas Emissions, and Vehicle Miles Traveled.
SETTING AND DESCRIPTION
Certain gases in the earth’s atmosphere, classified as greenhouse gases (GHG s), play a critical role in determining the earth’s surface temperature. A portion of the solar radiation that enters the atmosphere is absorbed by the earth’s surface, and a smaller portion of this radiation is reflected back toward space. Infrared radiati on is absorbed by GHGs; as a result, infrared radiation released from the earth that otherwise would have escaped back into space is instead trapped, resulting in a warming of the atmosphere. This phenomenon, known as the greenhouse effect, is responsible for maintaining a habitable climate on Earth.
GHGs are present in the atmosphere naturally, are released by natural sources and anthropogenic sources, and are formed from secondary reactions taking place in the atmosphere. The following GHGs are widely accepted as the principal contributors to human-induced global climate change and are rel evant to the project: carbon dioxide (CO
2), methane, and nitrous oxide.
Emissions of CO 2 are byproducts of fossil fuel combustion. Methane is the main component of natural gas and is associated with agricultural practices and landfills. Nitrous oxide is a colorless GHG that results from industrial processes, vehicle emission s, and agricultural practices.
Global warming potential (GWP) is a concept developed to compare the ability of each GHG to trap heat in the atmosphere relative to CO
2. The GWP of a GHG is based on several
factors, including the relative effectiveness of a gas in absorbing infrared radiation and the length of time the gas remains in the atmosphere ( i.e., its atmospheric lifetime). The reference gas for GWP is CO2; therefore, CO2 has a GWP of 1. The other main GHGs that have been attributed to human activity include methane, which has a GWP of 28, and nitrous oxide, which has a GWP of 265 (IPCC 2013). For example, 1 ton of methane has the same contribution to the greenhouse effect as approximately 28 tons of CO 2. GHGs with lower emissions rates than CO 2 may still contribute to climate change, because they are more effective than CO2 at absorbing outgoing infrared radiation (i.e., they have high GWPs). The concept of CO2-equivalents (CO2e) is used to account for the different GWP potentials of GHGs to absorb infrared radiation.
Climate Change
Global climate change is a change in the average weather of the Earth, which can be measured by wind patterns, storms, precipitation, and temperature. It is exacerbated by GHGs, which trap heat in the atmosphere (called the “greenhouse” effect). GHGs include carbon dioxide, methane, and nitrous oxide, and are emitted by natural processes and human activities. Potential adverse effects of global climate change include a reduction in the quality and supply of water to the state from the Sierra snowpack, a rise in sea levels, and changes to ecosystems and the natural environment.
Emissions of GHGs contributing to global climate change are attributable in large part to human activities associated with the industrial/manufacturing, utility, transportation, Initial Study #22-32
residential, and agricultural sectors. Therefore, the cumulative global emissions of GHGs contributing to global climate change can be attributed to every nation, region, city, and virtually every individual on Earth. A project’s GHG emissions are at a micro- scale relative to global emissions, but could result in a cumulatively considerable incremental contribution to a significant cumulative macro-scale impact.
Regulatory Context
The City of Merced has developed and approved a Climate Action Plan (October 1, 2012).
The City of Merced Climate Action Plan provides strate gies for reduction of GHG emissions. The SJVAPC Guidance for Valley Land- use Agencies in Addressing GHG Emission Impacts for New Projects under CEQA (December 17, 2009) provides guidance for addressing GHG analysis and implements a 29 percent reduction in project GHG emissions.
Significance Criteria
The Climate Action Plan provides strategies and actions for new developments in Part 4:
Climate Action Plan Strategies and Actions. Consistence with the Climate A ction Plan strategies and action would show the project would not significantly increase GHG emissions in the future. The SJVAPCD criteria is to reduce GHG emission by 29 percent over business-as-usual.
Construction GHG Emissions
Construction of the project would emit GHGs during the operation of heavy equipment.
Table 5 provides an estimate of project related GHG emissions per construction year.
Table 5
Construction Related GHG Emissions
Construction
Year
CO2e
Emissions
MT/year
2023 264.77
2024 131.69
Maximum
Year
Emissions 264.77
Operational GHG Emissions
Operation of the project would emit GHGs from area, energy, mobile, stationary, waste, and water sources. Table 5 provides an estimate of project related GHG emissions per construction year.
Initial Study #22-32
Table 6
Estimation of Project Related GHG Emissions
Operation
CO2e Emissions
MT/year
Total GHG Emissions 652
Project’s Consistency with City’s Climate Action Plan
The greatest source of GHG emissions emitted from the project is from mobile sources. It is important that the project be consistent with reduced VMT and strategy provided in the Climate Action Plan. As shown below, in the Vehicle Miles Traveled section, the location and connectivity of the project would reduce the overall VMT and, therefore, reduce GHG emissions. It is anticipated that the location of the project would reduce residential VMT by greater than 50 percent (refer to Vehicle Miles Traveled Section). Table 6 shows GHG emissions based on the reduction of VMT estimated in Vehicle Miles Traveled Section, as shown emissions are reduced by 39 percent.
Table 7
Reduced VMT Related GHG Emissions
Operation
CO2e
Emissions
MT/year
Total GHG
Emissions 396
The project is also consistent with the City’s Climate Action Plan, Strategy EM 1.5 Mobility Development Review Polices due to the project’s connectivity with the adjacent neighborhoods, nearby transit stops on Gerard Avenue (Route M5 – Merced South-East), and schools which reduce mobile GHG emissions. The project would not create any significant new sources of GHG emissions and would comply with the City’s Climate Action Plan and SJVAPCD emissions reduction requirements; therefore, the project would not contribute to adverse impacts associated with cumulative GHG emissions. Less than Significant.
Initial Study #22-32
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
Q. Greenhouse Gas Emissions.
Would the project:
1) Generate greenhouse gas emission s, either
directly or indirectly, that may have a
significant impact on the environment?
2) Conflict with an applicable plan, policy, or
regulation adopted for the purpose of
reducing the emissions of greenhouse
gases?
1) Less -than-Significant Impact
The San Joaquin Valley Air Pollution Control District (SJVAPCD) is responsible for protecting public health and welfare through the administration of federal and state air quality laws and policies. In December 2009, SJVAPCD adopted the Final Staff Report Addressing Greenhouse Gas Emissions Impacts under the California Environmental Quality Act (SJVAPCD 2009). SJVAPCD also developed guidance for land-use agencies to address GHG emission impacts for new development projects. Projects complying with an approved GHG emission reduction plan or GHG mitigation program would have a less- than-significant individual and cumulative impact related to GHG emissions. Projects implementing best performance standards and reducing project -specific GHG emissions by at least 29 percent compared to the business-as-usual condition would have a less-than- significant individual and cumulative impact on global climate change under this guidance.
However, models used to estimate GHG emissions now include some of the statewide measures that previously would have been used to evaluate this 29 percent reduction performance standard, so this particular method of comparison is out of date.
To establish the context in which to consider the project’s GHG emissions, this analysis used guidance from the adjacent Sacramento Metropolitan Air Quality Management District (SMAQMD) to determine significance. In 2014, SMAQMD adopted a significance threshold for GHG emissions consistent with the goals of Assembly Bill (AB) 32: 1,100 metric tons ( MT) CO
2e per year for construction- related and operationa l
emissions (SMAQMD 2014). This significance threshold w as developed to assess the consistency of a project’s emissions with the statewide framework for reducing GHG emissions.
The impacts associated with GHG emissions generated by the project are related to the emissions from sh ort-term construction and operations. Off -road equipment, materials transport, and worker commutes during construction of the project would generate GHG emissions. Emissions generated by the project during operations are related to indirect GHG emissions associated with residential uses.
Initial Study #22-32
GHG emissions associated with construction of the project are short -term and will cease following completion of construction activity . Therefore, the project would not generate GHG emissions, either directly or indirectly , that may have a significant impact on the environment. This impact would be less than significant. 2) Less-than-Significant Impact
In 2006, California enacted AB 32, the California Global Warming Solutions Act of 2006 (California Health and Safety Code Section 38500 et seq.). AB 32 establishes regulatory, reporting, and market mechanisms to achieve reductions in GHG emissions and establishes a cap on statewide GHG emissions. It requires that statewide GHG emissions be reduced to 1990 levels by 2020.
In 2008 and 2014, the California Air Resources Board (ARB) approved the Climate Change Scoping Plan (Scoping Plan) and the first update to the Climate Change Scoping Plan: Building on the Framework, respectively (ARB 2008; ARB 2014). In 2016, the state legislature passed Senate Bill SB 32, which established a 2030 GHG emissions reduction target of 40 percent below 1990 levels. In response to SB 32 and the companion legislation of AB 197, ARB approved the Final Proposed 2017 Scoping Plan Update: The Strategy for Achieving California’s 2030 GHG Target in November 2017 (ARB 2017). The 2017 Scoping Plan draws from the previous plans to present strategies to reaching California’s 2030 GHG reduction target. The project would comply with any mandate or standards set forth by an adopted Scoping Plan Update effecting construction activities and operations.
In 2012, the City of Merced adopted the Merced Climate Action Plan to address the reduction of major sources of GHG emissions. The climate action plan established an emissions target of 1990 levels by 2020, commensurate with the State of California’s target (City of Merced 2012). To meet this goal, the City adopted values, goals, and strategies to reduce emissions. Goals of the plan include:
• enhanced mobility of all transportation modes;
• sustainable community design;
• water conservation and technology;
• protection of air resources;
• waste reduction;
• increased use of renewable energy sources;
• building energy conservation; and
• public outreach and involvement.
The project would be consistent with the goals of the Merced Climate Action Plan.
As mentioned above, the project would not exceed emission s thresholds adopted by SMAQMD and would be consistent with the applicable requirements of the Merced Climate Action Plan. Therefore, the project would not conflict with any applicable plans, policies, or regulations adopted for the purpose of reducing GHG emissions. This impact would be less than significant.
LIVORNO RD
GI
RTH CT
DAFFODIL DR
CAPELLA DR
BLIX AVEHALLEY A
VE
DENISE DR
VEGA CT
FRONTA
GE RD
BALLANTYNE DR
BEGONIA DR
RYE ST
MIRA CT
S HWY 99
ZINNIA CT
N HWY 99
PLUIM
DR
S COFFEE ST
DINKEY CREEK AVE
CARLY A
NNE DR
E GERARD AVE
BRIM
M
ER RD
E CHILDS AVE
BUCKNER RD
S HWY 99 OF
F RAMP
S PARSONS AVE
E CAM
PUS PKW
Y
¯
Subject Site
ATTACHMENT A
ATTACHMENT A
1 8691 SF±
2345678 9
6725 SF±
10111213141516
6726 SF±
17 6726 SF±
18 6726 SF±
19 6726 SF±
20 6726 SF±
21 6651 SF±
25 6725 SF±
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 8691 SF±
6725 SF±6725 SF±6725 SF±6725 SF±6725 SF±6725 SF±
TOT LOT
8351 SF±
BASIN
29260 SF±
6725 SF±
6725 SF± 6725 SF± 6999 SF±
6724 SF±6725 SF±6725 SF± 6724 SF± 6724 SF± 6724 SF± 6724 SF± 6724 SF± 6724 SF± 6724 SF± 6724 SF± 6724 SF± 6724 SF± 6724 SF± 6724 SF± 6724 SF± 6724 SF± 6724 SF± 6724 SF± 6724 SF±6724 SF±6724 SF±
22 6819 SF±
24 6492 SF±
23 6000 SF±
CAPELLA DRIVE
COFFEE STREET
Date:
Checked By:
Drawn By:
Job. No.:
PROJECT DATA:
SHEET NUMBER:
PREPARED BY:
P.O. Box 349
Merced, CA 95341
Ph.: (209) 722-3200
Fax: (209) 722-3254
Date Description
PREPARED FOR:
405 West 19th Street
SHEET CONTENTS:
No.
E N G I N E E R I N G & S U R V E Y I N G
Merced, CA 95340
VESTING TENTATIVE MAP FOR
CAPELLA TERRACE
385 SOUTH COFFEE STREET, MERCED, CA
061-261-026-000
CITY OF MERCED, MERCED COUNTYCALIFORNIA
VESTING TENTATIVE MAP
TOPOGRAPHIC SURVEY
FORTIS GENERAL
CONSTRUCITON, SAM SAHOTA
25455 PRADO DE LOS PERAS,
CALABASAS, CA 91302
06/20/22
JX
JJ
22037
1 ATTACHMENT B
October 19, 2022
File No. 01222246.00
Sam Sahota
8499 Monte Cristo Avenue
Livingston, CA 95334
209-394-7986
[email protected]
Subject: Air Quality (AQ), Vehicle Miles Traveled (VMT), and Greenhouse Gas (GHG) Analyses for the Capella Terrace Land Use Project Located in Merced, Merced County, California
Dear Mr. Sahota:
Mr. Sam Sahota has requested SCS Engineers (SCS ) to provide an AQ, GHG, and VMT analyses for submittal to the City of Merced, California. It is our understanding that the Capella Terrace Project (project) is required by the City of Merced (City) to analyze the projects impact on air quality, GHG, and VMT; therefore, SCS provides Capella Terrace with the following letter.
PROJECT BACKGROUND
SCS understand Capella Terrace is developing a 9.91-acre subdivision project located at 385 South Coffee Street, Merced, CA. The subdivision is approximately 45 lots ranges between 6,726 to 8,691 square feet.
The proposed project will consist of a constructing a single-family residential subdivision. The City is requesting that a AQ, GHG, and VMT analyses be performed.
AIR QUALITY
REGULATORY CONTEXT
Ambient Air Quality Standards
Under the California Clean Air Act (CAA) establishes maximum ambient concentrations for the ten criteria air pollutants (CAPs), known as the California Ambient Air Quality Standards (CAAQS). The six CAPs are ozone (O3), nitrogen dioxide (NO2), sulfur dioxide (SO2), carbon monoxide (CO), lead (Pb), particulate matter 10 and 2.5 microns in size (PM10 and PM2.5), hydrogen sulfide, sulfates, visibility reducing particles, and vinyl chloride. Concentrations above these time-averaged limits are anticipated to cause adverse health effects to sensitive receptors. Table 1 shows the standards for the various averaging times for criteria pollutants under the CAAQS. The San Juaquin Valley Air Basin ( SJVAB) is in nonattainment for the following CAAQS criteria pollutants: ozone, PM10, PM2.5.
APPENDIX A
ATTACHMENT C
Mr. Sam Sahota
October 19, 2022
TABLE 1
STATE AND FEDERAL AMBIENT AIR QUALITY STANDARDS
Pollutant Averaging Time
Standard
parts per million or
microgram per cubic meter
CAAQS
Ozone
1 hour 0.09
8 hour 0.070
CO
8 hour 9
1 hour 20
NO2
Annual Mean 0.03
1 hour 0.18
SO2
24 hour 0.04
3 hour N/A
1 hour 0.25
PM10
Annual Mean (20)
24 hour (50)
PM2.5
Annual arithmetic
mean (12)
24 hour N/A
Pb
Rolling 3-Moth
Average N/A
30 Days (1.5)
Hydrogen Sulfide 1 hour 0.03
Vinyl Chloride 24 hour 0.01
Sulfate 24 hour (25)
Visibility Reducing
Particles 8 hour extinction of 0.23 per km
California State Implementation Plan (SIP)
California's SIP is comprised of the State’s overall air quality attainment plans to meet the NAAQS as well as the individual air quality attainment plans of each Air Quality Management District (AQMD) and Air Pollution Control District (APCD). The items included in the California SIP are listed in 40 CFR Chapter I, Part 52, Subpart F §52.220. The California SIP is a compilation of new and previously submitted plans, programs (such as monitoring, modeling, permitting, etc.), AQMD and APCD rules, State regulations, and federal controls for each air basin and California's overall air quality. Many of the items within the California SIP rely on the same control strategies, such as emissions standards for cars and heavy trucks, fuel regulations, and limitations on emissions from consumer products. AQMDs and APCDs, as well as other agencies such as the Bureau of Automotive Repair, prepare draft California SIP elements and submit them to CARB for review and approval. The California CAA identifies California Ai r Resource Board (CARB) as the lead agency for compiling items for incorporation into the California SIP, and submitting the items to the CalEPA for approval. San Juaquin Valley Air Basin (SJV AB) is in nonattainment for ozone, PM
10, PM2.5 and have approved SIPs.
APPENDIX A
Mr. Sam Sahota
October 19, 2022
San Joaquin Valley Air Pollution Control District (SJVAPCD) The SJVAPCD is a regional agency which regulates stationary sources of air pollution within the SJVAB whose boundaries are contiguous with the County’s boundaries. Its primary purpose is to enforce local, state, and federal air quality regulations in order to satisfy ambient air quality standards and protect the public from harm due to poor air quality. The SJVAPCD regulates air quality through its permit authority over most types of stationary emission sources and through its planning and review activities.
Additionally, the SJVAPCD regulates open and agricultural burning and is responsible for air quality monitoring, preparing clean air plans, and responding to citizen complaints regarding air quality.
All projects in Merced County and in the community of Merced are subject to applicable SJVAPCD rules and regulations in effect at the time of construction and operation. The SJVAPCD has adopted air quality thresholds for determination of impact significance for projects subject to CEQA review. Air quality significance criteria is provided in Table 2.
TABLE 2
AIR QUALITY THREHOLDS OF SIGNIFICANCE – CRITERIA POLLUTANTS Pollutant/Precursor
Construction
Emissions
Operational Emissions
Permitted
Equipment and
Activities
Permitted
Equipment and
Activities
Tons/Year
CO 100 100 100
NOx 10 10 10
ROG 10 10 10
SOx 27 27 27
PM10 15 15 15
PM2.5 15 15 15
SJVAPCD, AQ Thresholds of Significance – Criteria Pollutants (March 19, 2015) Methodology
The Proposed Project’s short-term construction-related criteria pollutant emissions were estimated using California Emissions Estimator Model (CalEEMod) Version 2020.4.0. The CalEEMod used default values for construction and operational emissions estimate. Because the City does not provide criteria pollutant emission thresholds, estimated project-related criteria pollutant emissions were compared to the SJVAPCD construction and operational criteria pollutant significant criteria shown in Table 2.
Merced County is classified as nonattainment under the CAAQS for ozone, PM 10, and PM2.5; therefore, an
applicable SIP or other applicable air quality plans have been developed and approved by the State of California. The SJVAPCD has developed significance criteria for criteria air pollutants as shown in Table 2, if the project’s emission do not exceed the significance criteria then the project is considered to have a less than significant impact on air quality.
APPENDIX A
Mr. Sam Sahota
October 19, 2022
Construction
Construction of the project would require demolition, site preparation, grading, building/infrastructure, paving and architectural coating. As shown in Table 3 construction criteria emission would not exceed the SJVAPCD significance criteria. Less than Significant.
TABLE 3
MAXIMUM ANNUAL CONSTRUCTION EMISSIONS
Pollutant/Precursor
Construction
Emissions
Significant
Criteria
Exceed
Significant
Tons/Year
CO 1.66 100 No
NOx 1.59 10 No
ROG 0.83 10 No
SOx .003 27 No
Total PM10 0.26 15 No
Total PM2.5 0.16 15 No
Operation
Operation of the project would emit criteria pollution from area, energy, mobile, stationary, waste, and water sources. Table 4 shows the emissions from the operation of the project with 45 single family homes. As shown in Table 4 project emission would not exceed the SJVAPCD significance threshold.
Therefore, operation of the project would not adversely impact regional air quality . Less than Significant.
TABLE 4
MAXIMUM ANNUAL OPERATIONAL EMISSIONS
Pollutant/Precursor
Construction
Emissions
Significant
Criteria
Exceed
Significant
Tons/Year
CO 2.46 100 No
NOx 0.59 10 No
ROG 0.63 10 No
SOx 0.01 27 No
Total PM10 0.47 15 No
Total PM2.5 0.14 15 No
Cumulative Impacts
Although SJVAPCD does not have any quantitative cumulative significant criteria, air quality is cumulative in nature. CAAQS are predicated on past, present, and future emissions; therefore, if project -related
APPENDIX A
Mr. Sam Sahota
October 19, 2022
emission are found to have a less-than-significant impact in the near-term conditions, then cumulative impacts would also be less-than-significant. Project-related air quality impacts were found to be less- than-significant in the near-term conditions; therefore, the project would not adversely affect regional air quality in the future. Less than Significant.
GREENHOUSE GAS EMISSIONS
CLIMATE CHANGE
Global climate change is a change in the average weather of the Earth, which can be measured by wind patterns, storms, precipitation, and temperature. It is exacerbated by GHGs, which trap heat in the atmosphere (called the “greenhouse” effect). GHGs include carbon dioxide, methane, and nitrous oxide, and are emitted by natural processes and human activities. Potential adverse effects of global climate change include a reduction in the quality and supply of water to the state from the Sierra snowpack, a rise in sea levels, and changes to ecosystems and the natural environment.
Emissions of GHGs contributing to global climate change are attributable in large part to human activities associated with the industrial/manufacturing, utility, transportation, residential, and agricultural sectors.
Therefore, the cumulative global emissions of GHGs contributing to global climate change can be attributed to every nation, region, city, and virtually every individual on Earth. A project’s GHG emissions are at a micro-scale relative to global emissions, but could result in a cumulatively considerable incremental contribution to a significant cumulative macro-scale impact.
REGULATORY CONTEXT
The City of Merced has developed and approved a Climate Action Plan (October 1, 2012). The City of Merced Climate Action Plan provides strategies for reduction of GHG emissions. The SJVAPC Guidance for Valley Land-use Agencies in Addressing GHG Emission Impacts for New Projects under CEQA (December 17, 2009) provides guidance for addressing GHG analysis and implements a 29 percent reduction in project GHG emissions.
METHODOLOGY
The Proposed Project’s short-term construction-related GHG emissions were estimated using the California Emissions Estimator Model (CalEEMod) Version 2020.4.0. The CalEEMod used default values for construction and operational emissions estimate.
SIGNIFICANCE CRITERIA
The Climate Action Plan provides strategies and actions for new developments in Part 4: Climate Action Plan Strategies and Actions. Consistence with the Climate action Plan strategies and action would show the project would not significantly increase GHG emissions in the future. The SJVAPCD criteria is to reduce GHG emission by 29 percent over business-as-usual.
APPENDIX A
Mr. Sam Sahota
October 19, 2022
Construction GHG Emissions
Construction of the project would emit GHGs during the operation of heavy equipment. Table 5 provides an estimate of project related GHG emissions per construction year. Detailed calculations are provided in Appendix A.
TABLE 5
CONSTRUCTION RELATED GHG EMISSIONS
Construction Year
CO2e Emissions
MT/year
2023 264.77
2024 131.69
Maximum Year Emissions 264.77
Operational GHG Emissions
Operation of the project would emit GHGs from area, energy, mobile, stationary, waste, and water sources. Table 5 provides an estimate of project related GHG emissions per construction year. Detailed calculations are provided in Appendix A.
TABLE 5
ESTIMATION OF PROJECT RELATED GHG EMISSIONS
Operation
CO2e Emissions
MT/year
Total GHG Emissions 652
Project’s Consistency with City’s Climate Action Plan
The greatest source of GHG emissions emitted from the project is from mobile sources (refer to Appendix A). It is important that the project be consistent with reduced VMT and strategy provided in the Climate Action Plan. As shown below, in the Vehicle Miles Traveled section the location and connectivity of the project would reduce the overall VMT and therefore, reduce GHG emissions. It is anticipated that the location of the project would reduce residential VMT by greater than 50 percent (refer to Vehicle Miles Traveled Section). Table 6 shows GHG emissions based on the reduction of VMT estimated in Vehicle Miles Traveled Section, as shown emissions are reduced by 39 percent, CalEEMod output files are provided in Appendix B.
TABLE 6
REDUCED VMT RELATED GHG EMISSIONS
Operation
CO2e Emissions
MT/year
Total GHG Emissions 396
The project is also consistent with the City’s Climate Action Plan, Strategy EM 1.5 Mobility Development Review Polices due to the project’s connectivity with the adjacent neighborhoods, nearby transit stops on Gerard Avenue (Route M5 – Merced South-East), and schools which reduce mobile GHG emissions.
APPENDIX A
Mr. Sam Sahota
October 19, 2022
The project would not create any significant new sources of GHG emissions and would comply with the City’s Climate Action Plan and SJVAPCD emissions reduction requirements; therefore, the project would not contribute to adverse impacts associated with cumulative GHG emissions. Less than Significant.
VEHICLE MILES TRAVELED
Regulatory Context
Pursuant to Senate Bill 743 (passed in 2013), the metric for analyzing transportation impacts under the California Environmental Quality Act (CEQA) officially changed over on July 1, 2020 from level of service to VMT. The 2030 City of Merced General Plan identifies the improvement project and strategies that have and will assist the City of Merced in reducing it vehicles miles traveled.
Vehicle Miles Traveled Analysis
Calculation of VMT shown in the CalEEMod output files in Appendix A, Section 4.0 Operational Detail – Mobile, 4.2 Trip Summary Information shows that the project’s annual VMT is 1,222.52 miles. This is unmitigated VMT and does not show reduction for location of the project to transportation, schools, connectivity, employment centers, and shopping.
The project is located within one mile of the E Garard Avenue bus stop, and the bus route currently passes between East Childs and East Garard Avenues via South Coffee Street (M-5 Merced South-East bus route), which will provide the entrance to the project. The project is located within 0.1 miles of the Pioneer Elementary School less than a mile from Golden Valley High School and Joe Herb Park, and is adjacent to an existing single-family residential subdivisions. The project would be connected to the adjacent subdivision via roadway with sidewalks, which would provide easy access to transport and other amenities. The project is located within 3.5 miles of the city center where the majority of employers are located. Shopping centers and markets are located throughout Merced, within a distance of three miles from the project site.
The CalEEMod trip generation (Institute of Transportation Engineers (ITE), Trip Generation Manual, 10 th
Edition) provides for trip lengths of for home to work as 10.8-mile, home to shop as 7.3-miles, and home to other (schools, recreation) as 7.5-miles. As shown above the distance to from home to work, home to shopping, and home to schools is less than half these default distance provided by the ITE; therefore, given the location of the project, it is expected to reduce VMT by more 50 percent. Less than Significant.
APPENDIX A
Mr. Sam Sahota
October 19, 2022
CONCLUSION
Implementation of the project would not result in result in a significant regional AQ impacts, a significant increase in GHG emissions, and would comply with VMT criteria within the City.
Sincerely,
Erin Quinn Patrick Sullivan
Project Director Senior Vice President
SCS Engineers SCS Engineers
APPENDIX A