Cities Index.
Presentation

City Council/Public Finance and Economic Development Authority/Parking Authority
April 3, 2023

Document
Presentation
Meeting
April 3, 2023
Body
City Council/Public Finance and Economic Development Authority/Parking Authority
Original file
12.8 MB
Text extracted from the city's file for reading and search. Open the original on cityofmerced.legistar1.com. That file is the official record.

Preliminary Annexation #22
-
03 Baxter Ranches Preliminary Annexation
City Council April 3, 2022

PRE-APPLICATION PROCESS

1. Applicant submits an “Annexation Pre-application.”

2. Meeting(s) with City staff and LAFCO staff.

3. Schedule for regularly scheduled City Council Meeting.

4. Prepare report for City Council with analysis of “merit criteria” & the project’s infrastructure needs.

5. The City Council will indicate general support or non-support for application moving forward.

6. Applicant Decides Whether or Not to Proceed.

BAXTER RANCHES ANNEXATION

OVERVIEW
Open Space
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOpppppppppppppppppppppppppppppppppeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeennnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSppppppppppppppppppppppppppppppppaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaccccccccccccccccccccccccccccccccccccceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee ppp
OOOOOOppppppp
ppppppppppp
Parkinson Drain & Fahrens Creek
pppppppppp

5.08 OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS Park/Basin
PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaarrrrrrrrrrrrrrrrrrrrrrrrrrrrkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk////////////////////////////////BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaasssssssssssssssssssssssssssssssssiiiiiiiiiiiiiiiiiiiinnnnnnnnnnnnnnnnnnnnnnnnnnnn Dual Use Park/Basin

9.35 acres
PPPPPPPPPPPPPPPPPPPPPPPPPPP kkkkkkkkkkkkkkkkkk///////////////////////////BBBBBBBBBBBBBBBBBBBBBBBBBBBB iiiiiiiiiiiiiiiiiiiiii Residential
RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRReeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeessssssssssssssssssssssssssssssssssiiiiiiiiiiiiiiiiiiiiiiidddddddddddddddddddddddddddddddddddddeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeennnnnnnnnnnnnnnnnnnnnnnnnnnnnnnttttttttttttttttttttttttttiiiiiiiiiiiiiiiiiiiaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaallllllllll Low Density Residential
580 Single-Family Lots
RRRRRRRRRRRRRRRRRRRRRRRRR iiiiiiiiiiiiiiiiiiidddddddddddddddddd ttttttttttttttttttttttiiiiiiiiiiiiiiiiiiiiii lllllllllllllllllllll 161.05 Acres North of Bellevue , West of M Street (extended) 111111111111111111111111111111116666666666666666666666666666666666666661111111111111111111111111111111.....................00000000000000000000000000000000000005555555555555555555555555555555555555 AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAcccccccccccccccccccccccccccccccccccrrrrrrrrrrrrrrrrrrrrrrrrrrrrrreeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeessssssssssssssssssssssssssssssssssss NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNooooooooooooooooooooooooooooooooooooorrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrtttttttttttttttttttttttttttttttthhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhh ooooooooooooooooooooooooooooooooooooffffffffffffffffffffffffffffffff BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeelllllllllllllllllllllllllllllllllllllllllleeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeevvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvuuuuuuuuuuuuuuuuuuuuuuuuuuuuueeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeessssssssssssssssssssssssssssssssssssttttttttttttttttttttttttttttttt oooooooooooooooooooooooooooooooooooffffffffffffffffffffffffffffffff MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSStttttttttttttttttttttttttttttttrrrrrrrrrrrrrrrrrrrrrrrrrrrrrreeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeettttttttttttttttttttttttttttttttt (((((((((((((((((((((((((((((((((eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeexxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxttttttttttttttttttttttttttttttteeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeennnnnnnnnnnnnnnnnnnnnnnnnnnnnnndddddddddddddddddddddddddddddddddddeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeedddddddddddddddddddddddddddddddddddddd)))))))))))))))))))))))))))))))))) The Annexation would be required to comply with the City Council’s Policy on Affordable Housing.

LOCATION
‚ Within City Sphere of
Influence
‚ Adjacent to City Limits

EXISTING & PROPOSED LAND USE PLAN
Existing General Plan Designations Proposed General Plan Designations

PROPOSED ZONING
‚ Proposed Planned Development
Zoning
‚ Standards would have to be
developed with the annexation
process.
‚ Land Uses would be consistent
with the General Plan.

CIRCULATION/MASTER SITE PLAN
Farmland Ave.

FFFFFFFFFFFFFFFFFaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaarrrrrrrrrrrrrrrrrrrrrrrrrrrmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmllllllllllllllllaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaannnnnnnnnnnnnnnnnnnnnnnnnnnnnnddddddddddddddddddddddddddddddddd AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvveeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee.................

Bellevue Rd.

BBBBBBBBBBBBBBBBBBBBBBBBBBBBeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeellllllllllllllllllllllllllllllllllleeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeevvvvvvvvvvvvvvvvvvvvvvvvvvvvvvuuuuuuuuuuuuuuuuuuuuuuuuuuueeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee RRRRRRRRRRRRRRRRRRRRRRRRRRRRdddddddddddddddddddddddddddddddd.............

R St
RRRRRRRRRRRRRRRRRRRRRRRRRRRRRR SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS..

SSSSSSSSSSSSSSSSSSSttttttttttttttttttttttttttttttt
..............................

Four Phases of
Development

CONCEPTUAL
MASTER

SITE PLAN /

CIRCULATION

PRELIMINARY

LOT LAYOUT
Existing Home to Remain
Lots range from
approximately 5,000
s.f. to over 11,675 s.f.
with an average size of
6,378 s.f.

9.35 acres Park/Basin

5.08 acres of Open
Space

2.24 ac

3.63 ac

1.55 ac
Parkinson
Drain
Parkinson
Drain
‚ The developer would meet the City’s
RHNA Unit Production Policy.
‚ Of the 580 lots, 73 would be
affordable.
‚ A variety or unit types would be used
to meet the 12.5% requirement.
‚ Duplexes, Zero-Lot Line Townhomes,
ADU’s, and the use of SB 9 to create
small lots are some of the options the
developer is considering to meet the
affordable housing obligation.

RHNA UNIT PRODUCT POLICY

ESTIMATED WASTEWATER DEMAND
‚ Wastewater Demand
‚ 116,000 gallons per day
(average daily flow)
‚ 266,800 gallons per day
(peak hour flow)
‚ 130-acre feet per year
‚ The project would install
various sized gravity lines
into a Sanitary Sewer Lift
Station and force main a
waste discharge line into
the Bellevue Ranch Sewer
System.

ESTIMATED WATER DEMAND
ƒ Water Demand
ƒ 116,000 gallons per
day (average daily
demand)
ƒ 324,800 gallons per
day (peak hour
flow)
ƒ 220,400 gallons per
day (minimum daily
demand)

CITY COUNCIL
ACTION
General Support or Non-
Support for the Baxter
Ranches Annexation Moving
Forward?

← All documents from this meeting