PROJECT DESCRIPTION
235
Existing Conditions
• 1940s‐era building
• Too small to accommodate current needs
• Insufficient office space
• TSA screening checkpoint in lobby
• New terminal is needed to support existing
demand:
• New hold room with restrooms
• Dedicated TSA screening area and offices
• Additional airline and airport administration
offices
• Federal funds are available (CARES Act)
236
Project Goals
Support Existing Aviation Needs
• Provide dedicated TSA facilities
• Upgrade/improve airside services
• Provide additional space for staff and
administration
• Update passenger holding areas
• Provide a more energy‐efficient, sustainable facility • Enhance passenger experience
Create a "right‐sized" facility for MCE!
237
SITE PLAN
238
SITE PLAN
TERMINAL BUILDING
PARKING
ABANDONED GA TERMINAL
(TO BE REMOVED)
STAGING AREA 1
PROPOSED TERMINAL
BUILDING FOOTPRINT
STAGING AREA 2
HANGAR BBQ
RESTAURANT (TO
BE REMOVED)
AREA OF POTENTIAL EFFECT
EXISTING TERMINAL
BUILDING (WILL
REMAIN IN
AVIATION USE)
EXCLUDED FROM APE
ACCESS ROUTE
ELECTRICAL ALT 2
ELECTRICAL ALT 1
ELECTRICAL VAULT BUILDING
TAXIWAY G TAXILANE
239
TERMINAL BUILDING
240
FLOOR PLAN
ELECT. MECH.
MECHANICAL
YARD
TRASH TSA
CHECKPOINT
TELECOM
ENTRANCE
VESTIBULE QUEUING
HOLDROOM
PRE‐SECURE SINGLE USER RESTROOMS
POST‐SECURE SINGLE USER RESTROOMS
CONF.OFFICE
OFFICE
OFFICE
BREAK
ROOM
TICKETING
OUTBOUND
BAGGAGE
LACTATION ROOM
INBOUND
BAGGAGE
RAC
CONCESSIONS
CONCESSIONS
ARRIVAL / DEPARTURE VESTIBULE
CIRCULATION
241
RENDERING 1 ‐ arch
Existing ‐ Bird’s eye looking north
242
RENDERING 2 ‐ arch
Proposed ‐ Bird’s eye looking north
243
Existing ‐ Bird’s eye looking west
244
RENDERING 3 ‐ arch
Proposed ‐ Bird’s eye looking west
245
Existing – looking northeast
246
Proposed – looking northeast
247
Existing – looking southeast
248
Proposed – looking southeast
249
Existing – ground level looking northwest
250
Proposed – ground level looking northwest
251
Existing – ground level looking southeast
252
Proposed – ground level looking southeast
253
ENVIRONMENTAL
COMPLIANCE
254
Environmental Compliance
NEPA Compliance – FAA is Lead Agency
• Federal approvals and funding
• Proposed Categorical Exclusion – 2023
CEQA Compliance – City is Lead Agency
• Local approvals and matching funds
• Proposed Initial Study ‐ 2023
Transparency, outreach, and public involvement
are critical!
255
Environmental Considerations
Full complement of Environmental Analyses
• No significant natural resource effects
• Previously disturbed area
• No capacity enhancements
• No off‐site effects (within airport boundaries)
• Historic and Cultural Resources
• Current Terminal ‐ eligible for National Register of
Historic Places (NRHP)
• Structure to remain for reuse
• Outreach to Native American Tribes is underway
256