70 RESOLUTION NO. 2023-_

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF MERCED, CALIFORNIA, ADOPTING A
LIST OF PROJECTS FOR FISCAL YEAR 2023-2024
FUNDED BY SB 1: THE ROAD REPAIR AND
ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide;
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Merced are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year;
WHEREAS, the City of Merced must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; WHEREAS, the City of Merced, will receive an estimated $2,201,535 in RMRA funding in Fiscal Year 2023-24 from SB 1;
WHEREAS, this is the seventh year in which the City of Merced is receiving SB 1 funding and will enable the City of Merced to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; WHEREAS, the City of Merced has undergone a robust public process to ensure public input into our community's transportation priorities/the project list; WHEREAS, the City of Merced used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high- priority and cost-effective projects that also meet the community's priorities for transportation investment;
C:lUsers\KovalcheckL\AppData\Local\Microsoft\Windows\/NetCachelContent.OutlookVODEFTMK\Approving SB1 Funding 2023-2024.docx 1 WHEREAS, the funding from SB 1 will help the City of Merced maintain and rehabilitate streets, sidewalk infill projects, a Pedestrian Bridge repair project, and vehicle and pedestrian safety improvements at railroad crossings projects throughout the City of Merced this year and many similar projects into the future; WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment found that the City of Merced's streets and roads are in an at-risk or poor condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into an "excellent/good" condition; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive benefits in the City of Merced.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MERCED

DOES HEREBY RESOLVE, DETERMINE, FIND, AND ORDER AS
FOLLOWS:

SECTION 1. The foregoing recitals are true and correct.

SECTION 2. The following list of newly proposed projects will be funded in-part or solely with Fiscal Year 2023-24 Road Maintenance and Rehabilitation Account revenues:

SECTION 3. The following previously proposed and adopted projects may also utilize Fiscal Year 2023-24 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City of Merced is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues:

C: \Users|Kovalcheck \AppData\Local\Microsoft\Windows\INetCachelContent.OutlookUODEFTMK\Approving SB1 Funding 2023-2024.docx 2 NEW PROJECTS
Road Improvement/Reconstruction Projects
Proposed Schedule
Location Approximate Estimated Cost Proposed Schedule (Construction) Estimatec Quantity (Pre-Construction) Useful Life
(Linear ft)
Collins Drive (M St. to 1700 $815,036 5/23 - 12/24 2/25 - 12/25 10 - 20 years Olive Ave.) - Rehab and
Reconstruction
Total Estimated $815,036
Cost
Road Maintenance & Rehabilitation Programs and Material Purchase Estimated
Location Approximate Cost Estimated Useful
Quantity Procurement/Operational Life
Various Locations throughout LS S1,123,239 5 - 7 Years
City (S81) 7/23-6/24
Total Estimated S1,123,239
Cost

CARRY OVER PROJECTS
Safety Projects
Estimated Cost Proposed Schedule Proposed Schedule
Location Approximate (Pre-Construction) (Construction) Estimated Quantity Useful Life
R Street Quiet Zone (BNSF LS $160,000 12/23-5/24 7/24-12/25 10-20 years Railroad Tracks)
U Street Quiet Zone (BNSF LS $120,000 12/23-5/24 7/24-12/25 10-20 years Railroad Tracks!
Bear Creek Quiet Zone LS $150,000 12/23-5/24 7/24-12/25 10-20 years (BNSF Railroad Tracks)
Santa Fe Strip Park Speed LS $150,000 12/22-5/23 3/24-12/24 10-20 years Table (Santa Fe Strip Park
Santa Fe Strip Park 13,200 SF S225,000 1/22-5/23 10/23-624 10-20 years Sidewalk Replacement
$75,000 9/23-5/24 9/24-3/25 10-20 years
Bridge (Bear Creek: Dr. ar
eNSE Railscad Tracks)
M Street Eucalypsus Sike LS $150,000 12/23-5/24 10/245/25 10-20 years Path Repair (M St. from
Yosemite Ave. to Buena
Traffic Signal Tiring LS 5100,000 Procurement/Operational 10-20 years (Various Locations 12/23-3/24
throughout the City!
R Street Sidewalk LS $150,000 1/23-12/23 5/24-10/24 10-20 years Agracemen (Chits 10
Loop replacement FY2023 LS $94,000 Procurement/Operational 10-20 years (Various locations 12/23-3/24
throughout the City)
Total $1,374,000
Estimated Cost
C:\Users|KovalcheckL.\AppData\Local\MicrosofflWindowslINetCachelContent.OutlookVODEFTMK\Approving SB1 Funding 2023-2024.docx 3 Road Improvernent/Reconstruction Projects
Estimated Proposed Proposed
Location Approximate Cost Schedule Schedule Estimated Useful Quantity (Pre-Construction) (Construction) Life
Childs Ave (Parsons to Campus 6,900 S492,800 6/23-7/23 3/24-22/24 20-25 years Parkway)
R Street (Olive Ave to Northwood 1,130 $1,000,000 3/23-10/23 10/23-1/24 20-25 ears Dr)
Yosemite Ave (Parsons to 3,360 $2,500,000 1/22-10/22 6/23-12/23 20-25 years Mansionene)
Total Estimated Cost 53.992,800
PASSED AND ADOPTED by the City Council of the City of Merced at a regular meeting held on the day of 2023, by the following vote:

AYES: Council Members:

NOES: Council Members:

ABSENT: Council Members:

ABSTAIN: Council Members:

APPROVED:

Mayor
ATTEST:

STEPHANIE R. DIETZ, CITY CLERK
BY:

Assistant/Deputy City Clerk
(SEAL)
APPROVED AS TO FORM:
7/25/2023
City Attorney Date