Contract Change Order No 2

City Council/Public Finance and Economic Development Authority/Parking Authority
January 2, 2024

Document
Contract Change Order No 2
Meeting
January 2, 2024
Body
City Council/Public Finance and Economic Development Authority/Parking Authority
Original file
34.3 MB
Text extracted from the city's file for reading and search. Open the original on cityofmerced.legistar1.com. That file is the official record.

DATE:

PROJECT NAME:

PROJECT LOCATION:

CONTRACTOR:

ADDRESS:

REASON FOR CHANGE ORDER:

THE NUMBER OF WORKING DAYS WILL BE ADJUSTED AS FOLLOWS: 40 SKETCH ATTACHED: Yes
DESCRIPTION OF CHANGE:

Item No Unit Quantity Unit Price Amount
1 LS -1 15,000.00 $ (15,000.00) $
2 EA 2 3,500.00$ 7,000.00$
3 LF 1391 167.00 $ 232,297.00$ 4 EA 3 5,000.00 $ 15,000.00 $
5 LF -499 $ 90.00 (44,910.00)$ 6 LS -1 $ 41,900.00 (41,900.00)$
7 LS -1 $ 47,000.00 (47,000.00)$
105,487.00$
Item No Unit Quantity Unit Price Amount
1 LS 1 9,200.00 $ 9,200.00 $
2 LS 1 112,200.00 $ 112,200.00 $
3 SF 259,710 1.55 $ 402,550.50$ 4 LF 38 80.00 $ 3,040.00$
5 EA 1 2,400.00 $ 2,400.00 $
6 LS 1 3,200.00 $ 3,200.00 $
7 LS 1 401,500.00 $ 401,500.00 $
8 SF 23,666 9.50 $ 224,827.00$ 9 SF 9,400 2.00 $ 18,800.00$ 10 LF 1,100 2.00 $ 2,200.00$ 11 SF 4,625 2.00 $ 9,250.00$ 12 LF 1,477 15.00 $ 22,155.00$ 13 EA 4 9,000.00 $ 36,000.00 $
14 SF 226,609 0.60 $ 135,965.40$ 15 LS 1 18,300.00 $ 18,300.00 $
16 LS 1 12,250.00 $ 12,250.00 $
17 LS 1 1,414.10 $ 1,414.10$
18 LS 1 11,800.00 $ 11,800.00$
1,427,052.00$
1,532,539.00$
Item
Quantity Adjustments
Basketball Poles, Backboard, and Rim (Site Feature ‘59’) Electrical
Concrete Flatwork (Site Finish ‘A’)
Plexipave Surfacing Basketball Court (Site Finish ‘J’)
Plexipave Surfacing Basketball Court Striping (Site Finish ‘K’) Plexipave Surfacing Basketball Court Perimeter (Site Finish ‘L’) Item
10" Water Line (Offsite) (base bid Item 33)
Site Grading (Rough/ Fine)
12” Storm Drain
Storm Drain Area Drains
Total for Quanity Adjustments:

Extra Work to relocate 6" & 12" force main
Extra Work to Connect to MID transformer
Total for Change Order No. 2
Total for Extra Work
Extra Work to remove & replace crushed rock for underground CITY OF MERCED PROJECT NO. CP220061
CHANGE ORDER NO. 2
Surveying Services
Storm Drain Manholes (base bit Item 18)
Portable Changeable Message Signs (base bid Item 7)
October 3, 2023
Community Park 42
Merced, California
American Paving Company
P.O. Box 27587, Fresno CA 93729
Additional work to add underground electrical, water. Quantity adjustment for additional asphalt per the contract unit price. 6" Sewer (Additional Sewer lines) (base bid Item 23)
Sewer Manhole (base bid Item 24)
Credit for deletion of Polyolefin under concrete (base bid & CCO#1) Connect to Existing Storm Drain
2x4 Header at Limit of Phase 1 (Site Feature ‘50’)
Irrigation System
Credit for Storm Drain Pipe Substituion of ADS (12" & Above) Extra Work to relocated storm drain @ Well Site 20
Soil Import
Extra Work
1 AMERICAN PAVING CO.

RFI NO: 1
PROJECT: Community Park 42 DATE: July 28, 2023
AMERICAN PAVING CO. JOB NO. 21.2304
TO: City of Merced FROM: American Paving Co.

CARE OF: Joe Cardoso Chris Williams
678 W 18th St P.O. Box 27587
Merced, CA 95340 Fresno, CA 93729
(209) 388-7508 (559) 268-9886
FILING: APC RFI# 001

ATTN: Joe Cardoso POTENTIAL IMPACTS:
__X___SCHED _____LABOR
REF. SPECIFICATION: __X___MAT'L _____NO IMPACT
Bid Item #23 - 6" Sewer _____OTHER
DRAWING: C2.1, C2.2, C2.3, C2.4, RFI SUBMITTED BY: Chris Williams C2.5,C2.6 NEED REPLY BY: August 11, 2023
REQUEST: Bid Item # 23 - 6" Sewer shows a quantity of 1,170 LF. When we preformed our take off, we found 2,830LF shown on the plans. That’s an additional 1,660LF. Please verify quantities.

REPLY:

FIRM: SIGNED: DATE:

CC: _____CLARIFICATION ONLY
_____CHANGE IN CONTRACT
_____ENGINEER CHANGE
_____OTHER______________

REQUEST FOR INFORMATION
See sheets C2.1 to C2.5 and C2.7 to C2.8 Rev 1 dated 8/16/23 showing revised sewer line routing between concession building and well site 20. Line item 23 on Bid Schedule A to be updated to 2,561 LF.
8/16/2023
O'Dell Engineering
Angel Mariscal
FOR CONTINUATION SEE SHEET C1.9.
75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA C2.1UTILITY PLAN
MATCHLINE "B" - SEE SHEET C2.2
MATCHLINE "C" - SEE SHEET C2.5
22 SCALE: 1" =010204020'LOCATION MAP1"=500'
D
DMHRIM 159.45INV. 12" 154.82(W)INV. 12" 154.90(S)DDMHRIM 159.39INV. 12" 154.79(E)INV. 12" 154.82(S)164.3TOP 164.5TOP
D
DMHRIM 159.45INV. 12" 154.82(W)INV. 12" 154.90(S)DDMHRIM 159.39INV. 12" 154.79(E)INV. 12" 154.82(S)164.3TOP 164.5TOP FOR CONTINUATION SEE SHEET C2.6.
75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA C2.2UTILITY PLAN
MATCHLINE "B" - SEE SHEET C2.1
MATCHLINE "A" - SEE SHEET C2.3
23 SCALE: 1" =010204020'
LOCATION MAP1"=500'
75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA C2.3UTILITY PLAN
SCALE: 1" =010204020'
MATCHLINE "B" - SEE SHEET C2.2
MATCHLINE "A" - SEE SHEET C2.2
MATCHLINE "F" - THIS SHEET
MATCHLINE "F" - THIS SHEET
MATCHLINE "G" - SEE SHEET C2.4
24 LOCATION MAP1"=500'

UNK UTILITY VAULTUNK UTILITY VAULTUNK UTILITY VAULTELEC VAULTELEC CABINET DDRAIN INLETRIM 164.01LID IS ANCHORED DOWN
D
164.5TOP164.2TOP
164.0TOP

UNK UTILITY VAULTUNK UTILITY VAULTUNK UTILITY VAULTELEC VAULTELEC CABINET DDRAIN INLETRIM 164.01LID IS ANCHORED DOWN
D
164.5TOP164.2TOP
164.0TOP

UNK UTILITY VAULTUNK UTILITY VAULTUNK UTILITY VAULTUNK UTILITY VAULT

CEELEC VAULT ELEC VAULTELEC VAULTELEC CABINET
WATERW
18" SD 18" SDEGATE SWITCH
UNK UTILITY 4" PVC
DDMHRIM 164.93INV. 18" 158.64(E)INV. 18" 158.67(W)15003 164.0TOP
164.0TOP

UNK UTILITY VAULTUNK UTILITY VAULTUNK UTILITY VAULTUNK UTILITY VAULT

CEELEC VAULT ELEC VAULTELEC VAULTELEC CABINET
WATERW
18" SD 18" SDEGATE SWITCH
UNK UTILITY 4" PVC
DDMHRIM 164.93INV. 18" 158.64(E)INV. 18" 158.67(W)15003 164.0TOP
164.0TOP

MISSION AVENUE
ELEC VAULTELEC VAULTELEC VAULTWATER 12" PIPE
DDMHRIM 165.42INV. 18" 161.44(N)INV. 18" 161.39(S)INV. 18" 161.46(W)ELEC VAULTELEC VAULTELEC VAULTWATER 12" PIPE DDMHRIM 165.42INV. 18" 161.44(N)INV. 18" 161.39(S)INV. 18" 161.46(W)166.146 75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA C2.4UTILITY PLANSCALE: 1" =010204020'
MATCHLINE "G" - SEE SHEET C2.2
MATCHLINE "E" - THIS SHEET
MATCHLINE "E" - THIS SHEET

SEE BELOW FOR CONTINUATION
SEE ABOVE FOR CONTINUATION25LOCATION MAP1"=500'

IRRIRRIRR
WWATER TRENCH PATCHWATER TRENCH PATCHWATERWATERWARVS8" SS IRR WATERRIM 159.18SUMP 153.29FULL OF DEBRIS15006IRRIRRIRR WWATER TRENCH PATCHWATER TRENCH PATCHWATERWATERWARVS8" SS IRR WATERRIM 159.18SUMP 153.29FULL OF DEBRIS15006 IRR 12" GATE VALVEIRR 12" GATE VALVEINV. 24" (NE)=164.85WATER TRENCH PATCHELEC VAULTIRR GATE VALVEINV. 3" (E)=165.79INV. 18" (W)=164.23INV. 18" (E)=166.29INV. 24" (W)=165.79IRR 12" GATE VALVEIRR 12" GATE VALVEINV. 24" (NE)=164.85WATER TRENCH PATCHELEC VAULTIRR GATE VALVEINV. 3" (E)=165.79INV. 18" (W)=164.23INV. 18" (E)=166.29INV. 24" (W)=165.79 75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA C2.5UTILITY PLAN
SCALE: 1" =015306030'
MATCHLINE "D" - SEE BELOWMATCHLINE "C" - SEE SHEET C2.1 MATCHLINE "D" - SEE ABOVE

BARROSO AVENUECOLLEEN AVENUEFUTURE WINDER AVENUEWINDER AVENUE

FUTURE WINDER AVENUETYLER ROAD
26LOCATION MAP1"=500'
D
DMHRIM 159.45INV. 12" 154.82(W)INV. 12" 154.90(S)164.3TOP 164.3TOP
D
DMHRIM 159.45INV. 12" 154.82(W)INV. 12" 154.90(S)164.3TOP 164.3TOP
FOR CONTINUATION SEE SHEET C2.6.

C2.7UTILITY PLAN28
FOR CONTINUATION SEE SHEET C2.8.
75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA LOCATION MAP1"=500'SCALE: 1" =010204020'

UNK UTILITY VAULTUNK UTILITY VAULTUNK UTILITY VAULTUNK UTILITY VAULT CELEC CABINETUNK UTILITY 4" PVC
D
DMHRIM 160.02INV. 12" 154.86(N)INV. 15" 153.55(S)INV. 12" 154.79(W)INV. 18" 156.04(SE) DRAIN INLETRIM 164.01LID IS ANCHORED DOWN
DMHRIM 163.97
164.5TOP164.2TOP
164.0TOP
164.0TOP

UNK UTILITY VAULTUNK UTILITY VAULTUNK UTILITY VAULTUNK UTILITY VAULT CELEC CABINETUNK UTILITY 4" PVC
D
DMHRIM 160.02INV. 12" 154.86(N)INV. 15" 153.55(S)INV. 12" 154.79(W)INV. 18" 156.04(SE) DRAIN INLETRIM 164.01LID IS ANCHORED DOWN
DMHRIM 163.97
164.5TOP164.2TOP
164.0TOP
164.0TOP
C2.8UTILITY PLAN2975PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA FOR CONTINUATION SEE SHEET C2.7.

LOCATION MAP1"=500'SCALE: 1" =010204020'
AMERICAN PAVING CO.

RFI NO: 2
PROJECT: Community Park 42 DATE: July 28, 2023
AMERICAN PAVING CO. JOB NO. 21.2304
TO: City of Merced FROM: American Paving Co.

CARE OF: Joe Cardoso Chris Williams
678 W 18th St P.O. Box 27587
Merced, CA 95340 Fresno, CA 93729
(209) 388-7508 (559) 268-9886
FILING: APC RFI# 002

ATTN: Joe Cardoso POTENTIAL IMPACTS:
__X___SCHED _____LABOR
REF. SPECIFICATION: __X___MAT'L _____NO IMPACT
Bid Item #24 - Sewer Manholes _____OTHER
DRAWING: C2.1, C2.2, C2.3, C2.4, RFI SUBMITTED BY: Chris Williams C2.5,C2.6 NEED REPLY BY: August 11, 2023
REQUEST: Bid Item # 24 - Sewer Manholes shows a quantity of 3 EA. When we preformed our take off, we found 6 EA shown on the plans. That’s an additional 3 EA. Please verify quantities.

REPLY:

FIRM: SIGNED: DATE:

CC: _____CLARIFICATION ONLY
_____CHANGE IN CONTRACT
_____ENGINEER CHANGE
_____OTHER______________

REQUEST FOR INFORMATION
8/7/2023
Angel Mariscal
O'Dell Engineering
Upon review of the bid documents, it was found that 4 manholes were unaccounted for.

Line item 24 on bid schedule to be updated to 7 each.

AMERICAN PAVING CO.

RFI NO: 5
PROJECT: Community Park 42 DATE: July 28, 2023
AMERICAN PAVING CO. JOB NO. 21.2304
TO: City of Merced FROM: American Paving Co.

CARE OF: Joe Cardoso Chris Williams
678 W 18th St P.O. Box 27587
Merced, CA 95340 Fresno, CA 93729
(209) 388-7508 (559) 268-9886
FILING: APC RFI# 005

ATTN: Joe Cardoso POTENTIAL IMPACTS:
__X___SCHED _____LABOR
REF. SPECIFICATION: __X___MAT'L _____NO IMPACT
Bid Item #33 - 10" Water Line (Offsite) _____OTHER
DRAWING: C2.1, C2.2, C2.3, C2.4, RFI SUBMITTED BY: Chris Williams C2.5,C2.6 NEED REPLY BY: August 11, 2023
REQUEST: Bid Item # 33 - 10" Water Line (Offsite) shows a quantity of 1,780 LF. When we preformed our take off, we found 1,290 LF shown on the plans. That’s 490 LF less than shown for the bid item.

Please verify quantities.

REPLY:

FIRM: SIGNED: DATE:

CC: _____CLARIFICATION ONLY
_____CHANGE IN CONTRACT
_____ENGINEER CHANGE
_____OTHER______________

REQUEST FOR INFORMATION
8/7/2023
O'Dell Engineering
Angel Mariscal
Upon review of the bid documents, there is 1,281 LF of 10" water line along Winder. See attached sheet C2.5 revision 2 for revised pipe sizes. Line item 22 on Bid Schedule A to be revised to 1,281 LF.

IRRIRRIRR
WWATER TRENCH PATCHWATER TRENCH PATCHWATERWATERWARVS8" SS IRR WATERRIM 159.18SUMP 153.29FULL OF DEBRIS15006IRRIRRIRR WWATER TRENCH PATCHWATER TRENCH PATCHWATERWATERWARVS8" SS IRR WATERRIM 159.18SUMP 153.29FULL OF DEBRIS15006 IRR 12" GATE VALVEIRR 12" GATE VALVEINV. 24" (NE)=164.85WATER TRENCH PATCHELEC VAULTIRR GATE VALVEINV. 3" (E)=165.79INV. 18" (W)=164.23INV. 18" (E)=166.29INV. 24" (W)=165.79IRR 12" GATE VALVEIRR 12" GATE VALVEINV. 24" (NE)=164.85WATER TRENCH PATCHELEC VAULTIRR GATE VALVEINV. 3" (E)=165.79INV. 18" (W)=164.23INV. 18" (E)=166.29INV. 24" (W)=165.79 75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA C2.5UTILITY PLAN
SCALE: 1" =015306030'
MATCHLINE "D" - SEE BELOWMATCHLINE "C" - SEE SHEET C2.1 MATCHLINE "D" - SEE ABOVE

BARROSO AVENUECOLLEEN AVENUEFUTURE WINDER AVENUEWINDER AVENUE

FUTURE WINDER AVENUETYLER ROAD
26LOCATION MAP1"=500'
315 North Thorne Avenue Telephone: 559-268-9886 PO Box 27587 Fax: 559-268-2908 Fresno, Ca 93729

An Affirmative Action / Equal Opportunity Employer Lic. No. 181430 Member Associated General Contractors of America
October 20, 2023

City of Merced
678 W. 18th Street
Merced, CA 95340

Attn: Joe Cardoso, PLS
Project: Community Park 42
Subject: PCO #4 - Polyolefin Credit REV 2

We are pleased to provide the following credit in response to APC RFI #15 Polyolefin deletion. We will credit all costs for labor, equipment, materials and incidentals to furnish and install the new polyolefin under concrete.

Item Description Quantity U.M. Unit Price Total
1 Credit for deletion of Polyolefin
under concrete – Base Bid & Change
Order #1
1 LS ($41,900.00) ($41,900.00)

Total ($41,900.00)

Should you have any questions, please do not hesitate to contact us at (559) 268-9886.

American Paving Co.

Chris Williams
Chris Williams
Project Engineer
315 North Thorne Avenue Telephone: 559-268-9886 PO Box 27587 Fax: 559-268-2908 Fresno, Ca 93729

An Affirmative Action / Equal Opportunity Employer Lic. No. 181430 Member Associated General Contractors of America
October 13, 2023

City of Merced
678 W. 18th Street
Merced, CA 95340

Attn: Joe Cardoso, PLS
Project: Community Park 42
Subject: PCO #5 – Relocate existing 6” & 12” force main due to new sewer conflict

We are pleased to provide the following proposal to relocate the existing 6” & 12” force main due to new sewer conflict. We will provide all costs for labor, equipment, materials and incidentals to furnish and relocate the existing 6” & 12” force main.

Item Description Quantity U.M. Unit Price Total
1 Relocate existing 6” & 12”
force main 1 LS $12,250.00 $12,250.00

Total 12,250.00

Should you have any questions, please do not hesitate to contact us at (559) 268-9886.

American Paving Co.

Chris Williams
Chris Williams
Project Engineer

COMMUNITY PARK - 42

CITY OF MERCED

STANDARD SPECIFICATIONS
BID ITEM DESCRIPTIONS 1

BID ITEM DESCRIPTIONS

BID ITEM DESCRIPTIONS
The descriptions below are general descriptions and do not include estimated quantities. See plans and bid summary for estimated quantities. Estimated quantities are provided as a courtesy only. Actual numbers and quantities of symbols on plans prevail.

Bid Item 1 - Surveying Services:

The lump sum bid for this item includes shall inclu de all labor, materials, tools, equipment, and all work necessary for the completion of this item.

Bid Item 2 - Soil Import:

The lump sum bid for this item shall include all co sts for soil import per landscape and civil plans. The item also includes labor, materials and all other work r equired by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item 3 - Site Grading (Rough/Fine):

The square footage bid for this item shall include all costs for rough grading, fine grading, and if n eeded, soil removal and disposal. The item also includes labor, materials and all other work required by the Drawi ngs and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item 4 -12” Storm Drain Line:

The linear footage price bid for this item shall in clude all costs for purchase and installation of fu lly functional storm water drainage systems structures, solid and perforated piping, fittings and componen ts, as indicated on the Drawings. The item also includes l abor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item 5 -Storm Drain Area Drains:

The unit price bid for this item shall include all costs for purchase and installation of fully functi onal storm water drainage system inlet structures, and related components, as indicated on the Drawings as well as finish grading of landscape areas to meet rim and i nvert elevations. The item also includes labor, mat erials and all other work required by the Drawings and Spe cifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item 6 -Connect to Existing Storm Sewer
The unit price bid for this item shall include all costs for purchase, line trenching, placement, back fill, and connection to existing storm sewer as indicated on the Drawings. The item also includes labor, mater ials and all other work required by the Drawings and Spe cifications which is not specifically set forth in the Bid form as a pay item.

Bid Item 7 -Electrical:

The lump sum price bid for this item shall include all costs for purchase and installation of a fully functional electrical power and lighting system, including switchboard, panels, transformers, grounding, conduits, pullboxes, conductors, light fixtures (including poles), devices and equipment as indicated on the Drawings and Specifications within Division 26. For light po les and structures listed as bid alternate within t his contract, the bidder shall provide a N16 pullbox at the termination point/location as part of base bid. This item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

COMMUNITY PARK - 42

CITY OF MERCED

STANDARD SPECIFICATIONS
BID ITEM DESCRIPTIONS 2

Bid Item 8 - Concrete Flatwork (Site Finish ‘A’):

The square foot price bid for this item shall include all costs for installation, soil preparation forming, sub- grade compaction, concrete additives, pigments and sealers, pouring concrete pavement, finishing, joints, and joint sealants in the areas indicated on the Drawings. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item 9 - Plexipave Surfacing Basketball Court Field (Site Finish ‘J’):

The square footage price bid for this item shall include all costs for purchase, installation and preparation of Plexipave court including surfacing and the flatwork in the areas indicated on the Drawings. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item 10 - Plexipave Surfacing Basketball Court Striping (Site Finish ‘K’):

The linear footage price bid for this item shall include all costs for purchase, installation and preparation of Plexipave court striping included on the surfacing in the areas indicated on the Drawings. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item 11 - Plexipave Surfacing Basketball Court Perimeter (Site Finish ‘L’):

The square footage price bid for this item shall include all costs for purchase, installation and preparation of Plexipave court including surfacing and the flatwork in the areas indicated on the Drawings. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item 12 - 2x4 Header at Limit of Work (Site Feature ‘50’):

The linear footage price bid for this item shall include all costs for purchase, installation, and preparation of header in the areas indicated on the Drawings. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item 13 - Basketball Poles, Backboard, and Rim (Site Feature ‘59’):

The unit price bid for this item shall include all costs for purchase and installation of a Basketball pole, backboard, rim, and footings as indicated on the Drawings. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item 31 - Irrigation System:

The lump sum price bid for this item shall include all costs for purchase and installation of irrigation pipe, equipment, heads, bubblers, wires, remote control valves, sensors, backflow preventer, fittings, and all other miscellaneous irrigation components for a fully functioning irrigation system as indicated on the Drawings and Specifications as required in the field. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

END OF SECTION
164.3TOP164.5TOP
164.5TOP164.2TOP164.0TOP164.0TOP164.3TOP164.3TOP164.5TOP 164.5TOP164.2TOP164.0TOP164.0TOP164.3TOP
N.T.S.
·SCALE: 1" =0 300'150'300'600'
COMMUNITY PARK-42SHEET INDEX - IMPROVEMENT PLANS

ABBREVIATIONSPROJECT INFORMATION

LANDSCAPE IMPROVEMENT LIMITS

GENERAL NOTES

TYLER ROAD

VICINITY MAP
CS75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA

BID SUBMITTAL
SignatureRenewal DateDateLICENSED LANDSCAPE ARCHITECTSTATE OF CALIFORNIA TYLER D. FAY #604904/30/24
01/12/2023

COVER SHEET
99 99140140
59 14059

MISSION AVENUE

CITY OF MERCED DEFERRED SUBMITTALS
1 75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA C1.7GRADING PLAN - NOT INUSE16

NOT IN USE

ADDITIONAL SCOPEBID DOCUMENTS
75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA C1.8GRADING PLAN - NOT INUSE17

NOT IN USE

ADDITIONAL SCOPEBID DOCUMENTS

FOR CONTINUATION SEE SHEET
C1.1.

C1.9GRADING PLAN18
SCALE: 1" =010204020'LOCATION MAP1"=500'75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA

ADDITIONAL SCOPEBID DOCUMENTS
D
DMHRIM 159.45INV. 12" 154.82(W)INV. 12" 154.90(S)D
DMHRIM 159.45INV. 12" 154.82(W)INV. 12" 154.90(S)FOR CONTINUATION SEE SHEET C1.5.

FOR CONTINUATION SEE SHEET C1.11.

C1.10GRADING PLAN19LOCATION MAP1"=500'SCALE: 1" =010204020' 75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA

ADDITIONAL SCOPEBID DOCUMENTS
D
DMHRIM 160.02INV. 12" 154.86(N)INV. 15" 153.55(S)INV. 12" 154.79(W)INV. 18" 156.04(SE) DRAIN INLETRIM 164.01LID IS ANCHORED DOWN
D
DMHRIM 160.02INV. 12" 154.86(N)INV. 15" 153.55(S)INV. 12" 154.79(W)INV. 18" 156.04(SE) DRAIN INLETRIM 164.01LID IS ANCHORED DOWN
C1.11GRADING PLAN20LOCATION MAP1"=500'SCALE: 1" =010204020' 75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA

ADDITIONAL SCOPEBID DOCUMENTS
C2.7UTILITY PLAN - NOT IN USE28

NOT IN USE
75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA

ADDITIONAL SCOPEBID DOCUMENTS
C2.8UTILITY PLAN - NOT IN USE29

NOT IN USE
75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA

ADDITIONAL SCOPEBID DOCUMENTS
FOR CONTINUATION SEE SHEET C2.1.

C2.9UTILITY PLAN30LOCATION MAP1"=500'SCALE: 1" =010204020' 75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA

ADDITIONAL SCOPEBID DOCUMENTS
D
DMHRIM 159.45INV. 12" 154.82(W)INV. 12" 154.90(S)D
DMHRIM 159.45INV. 12" 154.82(W)INV. 12" 154.90(S)D
DMHRIM 159.45INV. 12" 154.82(W)INV. 12" 154.90(S)
FOR CONTINUATION SEE SHEET C2.11.

FOR CONTINUATION SEE SHEET C2.6.

C2.10UTILITY PLAN31LOCATION MAP1"=500'SCALE: 1" =010204020' 75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA

ADDITIONAL SCOPEBID DOCUMENTS

CELEC CABINET
D
DMHRIM 160.02INV. 12" 154.86(N)INV. 15" 153.55(S)INV. 12" 154.79(W)INV. 18" 156.04(SE) DRAIN INLETRIM 164.01LID IS ANCHORED DOWN
DMHRIM 163.97 CELEC CABINET
D
DMHRIM 160.02INV. 12" 154.86(N)INV. 15" 153.55(S)INV. 12" 154.79(W)INV. 18" 156.04(SE) DRAIN INLETRIM 164.01LID IS ANCHORED DOWN
DMHRIM 163.97 CELEC CABINET
D
DMHRIM 160.02INV. 12" 154.86(N)INV. 15" 153.55(S)INV. 12" 154.79(W)INV. 18" 156.04(SE) DRAIN INLETRIM 164.01LID IS ANCHORED DOWN
DMHRIM 163.97
FOR CONTINUATION SEE SHEET C2.11.

C2.11UTILITY PLAN32LOCATION MAP1"=500'SCALE: 1" =010204020' 75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSA

ADDITIONAL SCOPEBID DOCUMENTS
BP
SITE FEATURE SCHEDULE (SHEETS L1.9-L1.11 ONLY)ITEMDESCRIPTION / MODELCOLORQUANTITYMANUFACTURER / SUPPLIER / INFORMATIONDET REF.

SITE FINISH SCHEDULE (SHEETS L1.9-L1.11 ONLY)FINISHDESCRIPTIONCOLORQUANTITYPATTERN / INFORMATIONDET REF.

SCALE: 1" =010204020'
75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
SignatureRenewal DateDateLICENSED LANDSCAPE ARCHITECTSTATE OF CALIFORNIA TYLER D. FAY #604904/30/24
01/12/2023
L1.9SITE FEATURES AND FINISHESPLAN 24
SHEET NOTESLOCATION MAP1"=500'ADDITIONAL SCOPEBID DOCUMENTS L1.1075
PROJECT# 122061LANDSCAPE IMPROVEMENT PLANS
ENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING

CITY MERCED, CALIFORNIAOF
INCORPORATED APRIL 1, A.D. 1889
"Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREE YOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
U SA
USA
SignatureRenewal DateDate

LICENSED LANDSCAPE ARCHITECTSTATE OF CALIFORNIA
TYLER D. FAY #6049
04/30/24
01/12/2023

SITE FEATURES AND FINISHESPLAN
MATCHLINE - SEE SHEET L1.11
24 SCALE: 1" =0 1020 4020'SHEET NOTES
LOCATION MAP1"=500'ADDITIONAL SCOPEBID DOCUMENTS
L1.1175PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
SignatureRenewal DateDateLICENSED LANDSCAPE ARCHITECTSTATE OF CALIFORNIA TYLER D. FAY #604904/30/24
01/12/2023

SITE FEATURES AND FINISHESPLAN
MATCHLINE - SEE SHEET L1.10
24 SCALE: 1" =010204020'SHEET NOTESLOCATION MAP1"=500'ADDITIONAL SCOPEBID DOCUMENTS BP
50'13'50'11'-6"
94' 20'
6'-7"6'-7"
14'26'6'49'6'
1'-6"37'-5"6'
25'
75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
SignatureRenewal DateDateLICENSED LANDSCAPE ARCHITECTSTATE OF CALIFORNIA TYLER D. FAY #604904/30/24
01/12/2023
L2.9HORIZONTAL CONTROLPLAN 32
SCALE: 1" =010204020'SHEET NOTESLOCATION MAP1"=500'ADDITIONAL SCOPEBID DOCUMENTS 25'
25'32'-6"11'-8"24'-10"15'10'-2" 225'225'
11'-8"32'-6"
8'-7"
25'
377'-2" 8'-7"
377'-2"
40'15'15'33'-8"33'-9"25'33'-6"
33'-9"
368'-10"
L2.1075PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
SignatureRenewal DateDateLICENSED LANDSCAPE ARCHITECTSTATE OF CALIFORNIA TYLER D. FAY #604904/30/24
01/12/2023

HORIZONTAL CONTROLPLAN
MATCHLINE - SEE SHEET L2.11
32 SCALE: 1" =010204020'SHEET NOTESLOCATION MAP1"=500'ADDITIONAL SCOPEBID DOCUMENTS 8'-7"
8'-7"15'
225' 25'-3"
15'
9'-9" 225'135'-5" 135'-5" 43'
32'-6"
10'
L2.1175PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
SignatureRenewal DateDateLICENSED LANDSCAPE ARCHITECTSTATE OF CALIFORNIA TYLER D. FAY #604904/30/24
01/12/2023

HORIZONTAL CONTROLPLAN
MATCHLINE - SEE SHEET L2.10
32 SCALE: 1" =010204020'SHEET NOTESLOCATION MAP1"=500'ADDITIONAL SCOPEBID DOCUMENTS BP
75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
SignatureRenewal DateDateLICENSED LANDSCAPE ARCHITECTSTATE OF CALIFORNIA TYLER D. FAY #604904/30/24
01/12/2023
L3.6IRRIGATION PLAN42
IRRIGATION SCHEDULE (SHEETS L3.6-L3.8 ONLY)SYMBOLMANUFACTURER/MODEL/DESCRIPTIONQTYPSIGPMRADIUSDETAILROTORS

BUBBLER

IRRIGATION EQUIPMENT
PIPING
SCALE: 1" =010204020'
LOCATION MAP1"=500'ADDITIONAL SCOPEBID DOCUMENTS

PIPING SCHEDULE

SHEET NOTES (NOT ALL MAY APPEAR ON THIS SHEET)
IRRIGATED LANDSCAPE WATER EFFICIENCY TABLEIRRIGATION SCHEDULEWATER BUDGET CALCULATIONSSCHEDULING NOTES & RUN TIMESMAXIMUM APPLIED WATER ALLOWANCEMAWA TOTAL=ESTIMATED TOTAL WATER USEETWU TOTAL=HYDROZONE INFORMATION TABLEWINTERSPRINGSUMMERFALLLANDSCAPE AREAS

SPECIAL LANDSCAPE AREAS
75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
SignatureRenewal DateDateLICENSED LANDSCAPE ARCHITECTSTATE OF CALIFORNIA TYLER D. FAY #604904/30/24
01/12/2023
L3.7IRRIGATION PLAN42
SCALE: 1" =010204020'LOCATION MAP1"=500'ADDITIONAL SCOPEBID DOCUMENTS MATCHLINE - SEE SHEET L3.8SHEET NOTES (NOT ALL MAY APPEAR ON THIS SHEET) 75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
SignatureRenewal DateDateLICENSED LANDSCAPE ARCHITECTSTATE OF CALIFORNIA TYLER D. FAY #604904/30/24
01/12/2023
L3.8IRRIGATION PLAN42
SCALE: 1" =010204020'LOCATION MAP1"=500'ADDITIONAL SCOPEBID DOCUMENTS MATCHLINE - SEE SHEET L3.7

SHEET NOTES (NOT ALL MAY APPEAR ON THIS SHEET)
75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
SignatureRenewal DateDateLICENSED LANDSCAPE ARCHITECTSTATE OF CALIFORNIA TYLER D. FAY #604904/30/24
01/12/2023
L4.6PLANTING PLAN48
SCALE: 1" =010204020'

SHEET NOTES (NOT ALL MAY APPEAR ON THIS SHEET)
LOCATION MAP1"=500'ADDITIONAL SCOPEBID DOCUMENTS
75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
SignatureRenewal DateDateLICENSED LANDSCAPE ARCHITECTSTATE OF CALIFORNIA TYLER D. FAY #604904/30/24
01/12/2023
L4.7PLANTING PLAN48
PLANT LEGEND - ADDED SCOPE AREAS ONLY (SHEETS L4.6-L4.8)SYMBOLBOTANICAL NAMECOMMON NAMESIZEAPPROX. SPACINGWATER USEQTY.REMARKSTREES SHRUBSTURFMISCELLANEOUS SCALE: 1" =010204020'LOCATION MAP1"=500'ADDITIONAL SCOPEBID DOCUMENTS MATCHLINE - SEE SHEET L4.8SHEET NOTES (NOT ALL MAY APPEAR ON THIS SHEET) 75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
SignatureRenewal DateDateLICENSED LANDSCAPE ARCHITECTSTATE OF CALIFORNIA TYLER D. FAY #604904/30/24
01/12/2023
L4.8PLANTING PLAN48
MATCHLINE - SEE SHEET L4.7
SCALE: 1" =010204020'LOCATION MAP1"=500'ADDITIONAL SCOPEBID DOCUMENTS

SHEET NOTES (NOT ALL MAY APPEAR ON THIS SHEET)
75PROJECT# 122061LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SUBMITTALCall : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA

BID SUBMITTAL
SignatureRenewal DateDateLICENSED LANDSCAPE ARCHITECTSTATE OF CALIFORNIA TYLER D. FAY #604904/30/24
01/12/2023
L5.10CONSTRUCTION DETAILS65
# PROJECT# 40320LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846PUBLIC WORKS

CITY MERCED, CALIFORNIA
OFINCORPORATED APRIL 1, A.D. 1889
"Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SET Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
PEZZONI ENGINEERING, INC. ã Copyrighted 20221150 9TH Street Suite #1415 Modesto, CA 95354PHONE: 209 . 554 . 4602HTTP://WWW.PEZENGR.COM

GENERAL NOTES AND ABBREVIATIONS

# PROJECT# 40320LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846PUBLIC WORKS

CITY MERCED, CALIFORNIA
OFINCORPORATED APRIL 1, A.D. 1889
"Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SET Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
PEZZONI ENGINEERING, INC. ã Copyrighted 20221150 9TH Street Suite #1415 Modesto, CA 95354PHONE: 209 . 554 . 4602HTTP://WWW.PEZENGR.COM

CONDUIT AND LIGHITNG SCHEDULES
ABCDF

LIGHTING FIXTURE SCHEDULE

164.52CONC164.58CONCUNK UTILITY VAULT164.65CONCUNK UTILITY VAULTUNK UTILITY VAULT 164.66CONC
164.61CONCUNK UTILITY VAULT

CE ELEC VAULT

ELEC VAULT

ELEC VAULTELEC VAULTELEC VAULTELEC VAULT
168.18CONC
168.11CONC
168.03CONC
168.08CONC
167.99CONC168.08CONC
167.96CONC
167.89CONC
167.64CONC
167.54CONC
167.54CONC6" STEEL PIPE
IRRINV. 42" (S)=160.26

ELEC VAULTELEC CABINET
FD 2" BD SEC. COR
CITY BENCHMARK 1124
168.21CONC165.50FL
168.26CONC165.46FL168.21CONC
165.43FL168.25CONC
168.21CONC
168.12CONC165.44FL
165.28FL168.08CONC
165.35FL168.05CONC
165.31FL168.08CONC
168.01CONC165.23FL168.07CONC
165.24FL
165.18FL
167.93CONC
165.05FL
167.75CONC

ELEC VAULT
167.82CONC
164.98FL
167.71CONC
167.88CONCSTOP AHEAD
15001
167.78CONC
165.00FL167.77CONC
167.44CONC
164.84FL167.66CONC
167.53CONC164.88FL
167.84CONC
164.94FL167.68CONC
167.51CONC
164.92FL
167.77CONC
167.52CONC164.78FL167.68CONC
167.55CONC164.66FL
164.61FL
167.46CONC167.46CONC
6" STEEL PIPE OUT OF GROUND167.51CONC
164.66FL
167.71CONC
167.54CONC164.70FL
167.57CONC
167.57CONC
167.62CONC164.71FL
167.47CONC
164.55FL
MISSION AVE TYLER RDINV. 42" (S)=160.91AUTHORIZED VEHICLES ONLY

E GATE SWITCH

IRR GATE VALVE
UNK UTILITY 4" PVC
INV. 18" (W)=165.34
UNK CONDUITINV. 6" (W)=165.67
INV. 6" (W)=165.66
STOP
45MPH
123C123C149S147C55C115C
149S149S129S129S
208C220C208C208C220C208C132C184C184C124C140C140C184C184C196C196C 132C
# PROJECT# 40320LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846PUBLIC WORKS

CITY MERCED, CALIFORNIA
OFINCORPORATED APRIL 1, A.D. 1889
"Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SET Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
PEZZONI ENGINEERING, INC. ã Copyrighted 20221150 9TH Street Suite #1415 Modesto, CA 95354PHONE: 209 . 554 . 4602HTTP://WWW.PEZENGR.COMLOCATION MAP1"=500' MATCHLINE "A" -SEE SHEET E1.3MATCHLINE "B" - SEE SHEET E1.2

AREA A - PARTIAL ELECTRICAL PLAN
”
“”“” “”“”

123C123C149S147C55C115C
149S149S129S129S
208C220C208C208C220C208C132C184C184C
124C140C140C184C184C196C196C
132C
164.52CONC164.58CONCUNK UTILITY VAULT164.65CONCUNK UTILITY VAULTUNK UTILITY VAULT 164.66CONC
164.61CONCUNK UTILITY VAULT

CE ELEC VAULT

ELEC VAULT

ELEC VAULTELEC VAULTELEC VAULTELEC VAULT
168.18CONC
168.11CONC
168.03CONC
168.08CONC
167.99CONC168.08CONC
167.96CONC
167.89CONC
167.64CONC
167.54CONC
167.54CONC6" STEEL PIPE
IRRINV. 42" (S)=160.26

ELEC VAULTELEC CABINET
FD 2" BD SEC. COR
CITY BENCHMARK 1124
168.21CONC165.50FL
168.26CONC165.46FL168.21CONC
165.43FL168.25CONC
168.21CONC
168.12CONC165.44FL
165.28FL168.08CONC
165.35FL168.05CONC
165.31FL168.08CONC
168.01CONC165.23FL168.07CONC
165.24FL
165.18FL
167.93CONC
165.05FL
167.75CONC

ELEC VAULT
167.82CONC
164.98FL
167.71CONC
167.88CONCSTOP AHEAD
15001
167.78CONC
165.00FL167.77CONC
167.44CONC
164.84FL167.66CONC
167.53CONC164.88FL
167.84CONC
164.94FL167.68CONC
167.51CONC
164.92FL
167.77CONC
167.52CONC
164.78FL167.68CONC
167.55CONC164.66FL
164.61FL
167.46CONC167.46CONC
6" STEEL PIPE OUT OF GROUND167.51CONC
164.66FL
167.71CONC
167.54CONC164.70FL
167.57CONC
167.57CONC
167.62CONC164.71FL
167.47CONC
164.55FL
MISSION AVE TYLER RDINV. 42" (S)=160.91AUTHORIZED VEHICLES ONLY

E GATE SWITCH

IRR GATE VALVE
UNK UTILITY 4" PVC
INV. 18" (W)=165.34
UNK CONDUITINV. 6" (W)=165.67
INV. 6" (W)=165.66
STOP
45MPH
123C123C149S147C55C115C
149S149S129S129S
208C220C208C208C220C208C132C184C184C
124C140C140C184C184C196C196C
132C
# PROJECT# 40320LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846PUBLIC WORKS

CITY MERCED, CALIFORNIA
OFINCORPORATED APRIL 1, A.D. 1889
"Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SET Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
PEZZONI ENGINEERING, INC. ã Copyrighted 20221150 9TH Street Suite #1415 Modesto, CA 95354PHONE: 209 . 554 . 4602HTTP://WWW.PEZENGR.COMLOCATION MAP1"=500' MATCHLINE "B" - SEE SHEET E1.1

AREA B - PARTIAL ELECTRICAL PLAN
”
“”“” “”“”

ELEC VAULT
15001
164.52CONC164.58CONCUNK UTILITY VAULT164.65CONCUNK UTILITY VAULTUNK UTILITY VAULT 164.66CONC
164.61CONCUNK UTILITY VAULT

CE ELEC VAULT

ELEC VAULT

ELEC VAULTELEC VAULTELEC VAULTELEC VAULT
168.18CONC
168.11CONC
168.03CONC
168.08CONC
167.99CONC168.08CONC
167.96CONC
167.89CONC
167.64CONC
167.54CONC
167.54CONC6" STEEL PIPE
IRRINV. 42" (S)=160.26

ELEC VAULTELEC CABINET
FD 2" BD SEC. COR
CITY BENCHMARK 1124
168.21CONC165.50FL
168.26CONC165.46FL168.21CONC
165.43FL168.25CONC
168.21CONC
168.12CONC165.44FL
165.28FL168.08CONC
165.35FL168.05CONC
165.31FL168.08CONC
168.01CONC165.23FL168.07CONC
165.24FL
165.18FL
167.93CONC
165.05FL
167.75CONC

ELEC VAULT
167.82CONC
164.98FL
167.71CONC
167.88CONCSTOP AHEAD
15001
167.78CONC
165.00FL167.77CONC
167.44CONC
164.84FL167.66CONC
167.53CONC164.88FL
167.84CONC
164.94FL167.68CONC
167.51CONC
164.92FL
167.77CONC
167.52CONC
164.78FL167.68CONC
167.55CONC164.66FL
164.61FL
167.46CONC167.46CONC
6" STEEL PIPE OUT OF GROUND167.51CONC
164.66FL
167.71CONC
167.54CONC164.70FL
167.57CONC
167.57CONC
167.62CONC164.71FL
167.47CONC
164.55FL
MISSION AVE TYLER RDINV. 42" (S)=160.91AUTHORIZED VEHICLES ONLY

E GATE SWITCH

IRR GATE VALVE
UNK UTILITY 4" PVC
INV. 18" (W)=165.34
UNK CONDUITINV. 6" (W)=165.67
INV. 6" (W)=165.66
STOP
45MPH
123C123C149S147C55C115C
149S149S129S129S
208C220C208C208C220C208C132C184C184C
124C140C140C184C184C196C196C
132C
# PROJECT# 40320LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846PUBLIC WORKS

CITY MERCED, CALIFORNIA
OFINCORPORATED APRIL 1, A.D. 1889
"Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SET Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
PEZZONI ENGINEERING, INC. ã Copyrighted 20221150 9TH Street Suite #1415 Modesto, CA 95354PHONE: 209 . 554 . 4602HTTP://WWW.PEZENGR.COMLOCATION MAP1"=500' MATCHLINE "B" -SEE SHEET E1.1
MATCHLINE "C" - THIS SHEET
MATCHLINE "A" - SEE SHEET E1.1
MATCHLINE "C" - THIS SHEET
MATCHLINE "D" - SEE SHEET E1.4

AREA C - PARTIAL ELECTRICAL PLAN
”
“”“” “”“”

164.52CONC164.58CONCUNK UTILITY VAULT164.65CONCUNK UTILITY VAULTUNK UTILITY VAULT 164.66CONC
164.61CONCUNK UTILITY VAULT
ELEC VAULTELEC CABINETUNK UTILITY 4" PVC
164.52CONC
164.61CONCUNK UTILITY VAULT

CE ELEC VAULTELEC VAULTELEC VAULTE GATE SWITCH
UNK UTILITY 4" PVC
164.52CONC164.58CONCUNK UTILITY VAULT164.65CONCUNK UTILITY VAULTUNK UTILITY VAULT 164.66CONC
164.61CONCUNK UTILITY VAULT

CE ELEC VAULT

ELEC VAULT

ELEC VAULTELEC VAULTELEC VAULTELEC VAULT
168.18CONC
168.11CONC
168.03CONC
168.08CONC
167.99CONC168.08CONC
167.96CONC
167.89CONC
167.64CONC
167.54CONC
167.54CONC6" STEEL PIPE
IRRINV. 42" (S)=160.26

ELEC VAULTELEC CABINET
FD 2" BD SEC. COR
CITY BENCHMARK 1124
168.21CONC165.50FL
168.26CONC165.46FL168.21CONC
165.43FL168.25CONC
168.21CONC
168.12CONC165.44FL
165.28FL168.08CONC
165.35FL168.05CONC
165.31FL168.08CONC
168.01CONC165.23FL168.07CONC
165.24FL
165.18FL
167.93CONC
165.05FL
167.75CONC

ELEC VAULT
167.82CONC
164.98FL
167.71CONC
167.88CONCSTOP AHEAD
15001
167.78CONC
165.00FL167.77CONC
167.44CONC
164.84FL167.66CONC
167.53CONC164.88FL
167.84CONC
164.94FL167.68CONC
167.51CONC
164.92FL
167.77CONC
167.52CONC
164.78FL167.68CONC
167.55CONC164.66FL
164.61FL
167.46CONC167.46CONC
6" STEEL PIPE OUT OF GROUND167.51CONC
164.66FL
167.71CONC
167.54CONC164.70FL
167.57CONC
167.57CONC
167.62CONC164.71FL
167.47CONC
164.55FL
MISSION AVE TYLER RDINV. 42" (S)=160.91AUTHORIZED VEHICLES ONLY

E GATE SWITCH

IRR GATE VALVE
UNK UTILITY 4" PVC
INV. 18" (W)=165.34
UNK CONDUITINV. 6" (W)=165.67
INV. 6" (W)=165.66
STOP
45MPH
123C123C149S147C55C115C
149S149S129S129S
208C220C208C208C220C208C132C184C184C
124C140C140C184C184C196C196C
132C
# PROJECT# 40320LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846PUBLIC WORKS

CITY MERCED, CALIFORNIA
OFINCORPORATED APRIL 1, A.D. 1889
"Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SET Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
PEZZONI ENGINEERING, INC. ã Copyrighted 20221150 9TH Street Suite #1415 Modesto, CA 95354PHONE: 209 . 554 . 4602HTTP://WWW.PEZENGR.COMLOCATION MAP1"=500' MATCHLINE "D" - SEE SHEET E1.3
MATCHLINE "E" - THIS SHEET
MATCHLINE "E" - THIS SHEET

AREA D - PARTIAL ELECTRICAL PLAN
”
“”“” “”“”

C
IRR
FD 2" BD SEC. COR
CITY BENCHMARK 1124

STOP AHEAD
15001

MISSION AVE TYLER RDAUTHORIZED VEHICLES ONLY

IRR GATE VALVE
STOP
45MPH
123C123C149S147C55C115C
149S149S129S129S
208C220C208C208C220C208C132C184C184C
124C140C140C184C184C196C196C
132C
# PROJECT# 40320LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846PUBLIC WORKS

CITY MERCED, CALIFORNIA
OFINCORPORATED APRIL 1, A.D. 1889
"Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SET Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
PEZZONI ENGINEERING, INC. ã Copyrighted 20221150 9TH Street Suite #1415 Modesto, CA 95354PHONE: 209 . 554 . 4602HTTP://WWW.PEZENGR.COMLOCATION MAP1"=500'

ADDED AREA A, PARTIALELECTRICAL PLAN -ELECTRICAL
”
“”“” “”“”

C
IRR
FD 2" BD SEC. COR
CITY BENCHMARK 1124

STOP AHEAD
15001

MISSION AVE TYLER RDAUTHORIZED VEHICLES ONLY

IRR GATE VALVE
STOP
45MPH
123C123C149S147C55C115C
149S149S129S129S
208C220C208C208C220C208C132C184C184C
124C140C140C184C184C196C196C
132C
LOCATION MAP1"=500'
SEE SHEET E1.7
”
“”“” “”“”
# PROJECT# 40320LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846PUBLIC WORKS

CITY MERCED, CALIFORNIA
OFINCORPORATED APRIL 1, A.D. 1889
"Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SET Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
PEZZONI ENGINEERING, INC. ã Copyrighted 20221150 9TH Street Suite #1415 Modesto, CA 95354PHONE: 209 . 554 . 4602HTTP://WWW.PEZENGR.COM

ADDED AREA B, PARTIALELECTRICAL PLAN -ELECTRICAL

C
IRR
FD 2" BD SEC. COR
CITY BENCHMARK 1124

STOP AHEAD
15001

MISSION AVE TYLER RDAUTHORIZED VEHICLES ONLY

IRR GATE VALVE
STOP
45MPH
123C123C149S147C55C115C
149S149S129S129S
208C220C208C208C220C208C132C184C184C
124C140C140C184C184C196C196C
132C
LOCATION MAP1"=500'
”
“”“” “”“”
# PROJECT# 40320LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846PUBLIC WORKS

CITY MERCED, CALIFORNIA
OFINCORPORATED APRIL 1, A.D. 1889
"Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SET Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
PEZZONI ENGINEERING, INC. ã Copyrighted 20221150 9TH Street Suite #1415 Modesto, CA 95354PHONE: 209 . 554 . 4602HTTP://WWW.PEZENGR.COM SEE SHEET E1.6

ADDED AREA C, PARTIALELECTRICAL PLAN -ELECTRICAL

# PROJECT# 40320LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846PUBLIC WORKS

CITY MERCED, CALIFORNIA
OFINCORPORATED APRIL 1, A.D. 1889
"Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SET Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
PEZZONI ENGINEERING, INC. ã Copyrighted 20221150 9TH Street Suite #1415 Modesto, CA 95354PHONE: 209 . 554 . 4602HTTP://WWW.PEZENGR.COM

PARTIAL PLOT PLANS

167.08
# PROJECT# 40320LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846PUBLIC WORKS

CITY MERCED, CALIFORNIA
OFINCORPORATED APRIL 1, A.D. 1889
"Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SET Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
PEZZONI ENGINEERING, INC. ã Copyrighted 20221150 9TH Street Suite #1415 Modesto, CA 95354PHONE: 209 . 554 . 4602HTTP://WWW.PEZENGR.COM “” ” ” ”

PARTIAL SITE PLAN - ELECTRICAL YARD

# PROJECT# 40320LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846PUBLIC WORKS

CITY MERCED, CALIFORNIA
OFINCORPORATED APRIL 1, A.D. 1889
"Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SET Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
PEZZONI ENGINEERING, INC. ã Copyrighted 20221150 9TH Street Suite #1415 Modesto, CA 95354PHONE: 209 . 554 . 4602HTTP://WWW.PEZENGR.COM

DETAILS

# PROJECT# 40320LANDSCAPE IMPROVEMENT PLANSENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846PUBLIC WORKS

CITY MERCED, CALIFORNIA
OFINCORPORATED APRIL 1, A.D. 1889
"Gateway to Yosemite"City of MercedCOMMUNITY PARK-42BID SET Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert 1 ( 800 ) 227 - 2600
USAUSA
PEZZONI ENGINEERING, INC. ã Copyrighted 20221150 9TH Street Suite #1415 Modesto, CA 95354PHONE: 209 . 554 . 4602HTTP://WWW.PEZENGR.COM

PANEL SCHEDULES &SINGLE LINE DIAGRAM