PROPOSED CHANGES TO BRMDP
TABLE 6.1
1 Village Proposed Change
17 R St – Yosemite Ave. to Cardella Rd. to be funded through the

NMMRIIF
Cardella Rd. - Freemark Ave. to R St. to be funded through the

NMMRIIF
Fahrens Creek Bridge at Cardella Rd. to become a City Capital Improvement Project funded through PFFP.

R St./Cardella Rd. Traffic Signal – to be installed when intersection is constructed. Signal is eligible for reimbursement through PFFP.
18 R St. – Cardella Rd. to Franciscan Dr. (now Arrow Wood) to be funded through the NMMRIIF
R St. – Franciscan Dr. (now Arrow Wood) to Bellevue Rd. to be funded through the NMMRIIF
Franciscan Dr. (Arrow Wood)/R St. Signal - to be installed when intersection is constructed. Signal is eligible for reimbursement through PFFP.

R St./Bellevue Rd. Signal - to be installed when intersection is constructed. Signal is eligible for reimbursement through PFFP. 19 Responsible for Bellevue Rd. Frontage
Franciscan Dr. (Arrow Wood) – from Freemark Ave. to R St. to be funded through the NMMRIIF
Fahrens Creek Bridge at Franciscan Ave. (Arrow Wood) - to be funded through the NMMRIIF
21 G St. – Bellevue Rd. to Merced College - to be funded through the NMMRIIF or Measure V funds
G St. & Foothill Dr. Signal – to be installed as “warranted” per Traffic Study prepared by Traffic Engineering Consultant. PFFP Eligible.
24 Changed Old Lake Rd. to Nevada St. due to the fact that Old Lake Rd. can’t be extended to the west of G St. as originally planned.
25 Collector St./Fahrens Creek bridge – omit due to biological constraints (wetlands) preventing the construction of the bridge Collector St (Farmland Ave.)/Fahrens Cr Bridge (near Phase 30 – clarified that the Collector St is Farmland Ave.

ATTACHMENT 8 - Page 1

PROPOSED CHANGES TO BRMDP
TABLE 6.1
2 Village Proposed Change
26 Old Lake Rd (omit) due to biological constraints preventing the extension of road west of G St.

Old Lake Rd/Fahrens Creek Bridge (omit) due to biological constraints preventing the extension of road west of G St.

G St/Collector St (Farmland Ave) Signal – complete
29 N/S Collector /Fahrens Creek Bridge (between M & R St) – omit 30 R St: 2 lanes 1/ mile north of Bellevue to Bellevue Rd to be funded through the NMMRIIF
Bellevue (changed from R St)/Fahrens Creek Bridge to become a City Capital Improvement Project funded through PFFP

ATTACHMENT 8 - Page 2