AMENDMENT MODIFICATION SUMMARY - (E-76)
FEDERAL AID PROGRAM CALIFORNIA DEPARTMENT OF TRANSPORTATION DLA LOCATOR: 10-MER-0-MER PROJECT LOCATION:
PREFIX: CML NORTH SIDE OF CHILDS AVE (FROM GOLDEN VALLEY HIGH SCHOOL TO COFFEE ST. (WEAVER MIDDLE SCHOOL)).
PROJECT NO: 5085(061) TYPE OF WORK:
SEQ NO: 3 CONSTRUCT A CLASS I (FULLY-SEPARATED). "SAFE ROUTES TO SCHOOL" PREV AUTH / AGREE DATES:
STATE PROJ NO: 1022000247L-N FED RR NO'S: PE:
AGENCY: MERCED
PUC CODES: R/W:
ROUTE:
PROJ OVERSIGHT:ASSUMED/LOCAL ADMIN CON:
DISASTER NO:
ENV STATUS / 05/10/2023 SPR:
TIP DATA
RW STATUS / DT: 1 08/10/2023 MCS:
MPO: MCAG
INV RTE: OTH:
FSTIP YR: 22/23
BEG MP:
STIP REF: 205-0000-0319
END MP:
FSTIP ID CMAQ21-05
BRIDGE NO:
PROG CODE LINE NO IMPV TYPE FUNC SYS URBAN AREA URB/RURAL DEMO ID Y003 30 28
Y003 31 17
Y400 10 15
FUNDING SUMMARY
PHASE PROJECT COST FEDERAL COST AC COST
PE
PE PREV. OBLIGATION $98,741.00 $87,415.00 $0.00
PE THIS $0.00 $0.00 $0.00
PE SUBTOTAL $98,741.00 $87,415.00 $0.00
R/W
RW PREV. OBLIGATION $0.00 $0.00 $0.00
RW THIS REQUEST $0.00 $0.00 $0.00
RW SUBTOTAL $0.00 $0.00 $0.00
CON
CON PREV. OBLIGATION $0.00 $0.00 $0.00
CON THIS REQUEST $1,135,509.00 $1,005,266.00 $0.00
CON SUBTOTAL $1,135,509.00 $1,005,266.00 $0.00
OTH
OTH PREV. OBLIGATION $0.00 $0.00 $0.00
OTH THIS REQUEST $0.00 $0.00 $0.00
OTH SUBTOTAL $0.00 $0.00 $0.00
TOTAL: $0.00$1,234,250.00 $1,092,681.00
03/30/2025PROJECT END DATE (PED):
ALT. PROJ NO:
STATE REMARKS
05/16/2022 * SEQ 1: Initial authorization of the PE phase. * Project End Date (PED) established as 08/01/2023 effective SEQ 1 approval. * Final design shall not start until NEPA is approved.
05/31/2023 Sequence #2 is a request to extend the project end date (PED) from 8/01/23 to 8/31/24. Project progress has been slowed by negotiations with the utilities on the eventual relocation of their facilities. There are no other actions requested.
09/01/2023 SEQ#3: RFA for CON/CE. DBE goal = 19.8%
09/13/2023 * SEQ 3: Initial authorization of the CON/CE phase. * CMAQ Emission Reduction (lb/yr): ROG - 0.03; NOx - 0.02; PM2.5 - 0.00; PM10 - 0.02. * Project End Date (PED) established as 03/30/2025 effective SEQ 3's approval. * Original NEPA signed on 5/9/2023 and revalidated 09/12/2023.
FEDERAL REMARKS
Attachment 2
AUTHORIZATION
AUTHORIZATION TO PROCEED WITH REQUEST:CON PREPARED IN FADS BY: NORIEGA, JASMINE ON 2023-10-30 948-3755 FOR: CON/CE AUTHORIZATION REVIEWED IN FADS BY: LIMA, WISHING ON 2023-11-12 599-4988 DOCUMENT TYPE: AMOD SUBMITTED IN FADS BY: LIMA, WISHING ON 2023-11-12 FOR CALTRANS PROCESSED IN FADS BY: SIGNATURE, NOT_REQUIRED ON 2023-11-12 FOR FHWA E-76 AUTHORIZED DATE IN FMIS GRACE REGIDOR ON 2023-11-15 21:17:30.0 SIGNATURE HISTORY FOR PROJECT NUMBER 5085(061) AS OF 11/16/2023
FHWA FMIS SIGNATURE HISTORY
MOD # SIGNED BY SIGNED ON
2 WAII HAYS 11/14/2023
WAII HAYS 11/14/2023
GRACE REGIDOR 11/15/2023
1 WAII HAYS 06/05/2023
WAII HAYS 06/05/2023
GRACE REGIDOR 06/12/2023
0 SHUN HUEY 06/01/2022
SHUN HUEY 06/01/2022
GRACE REGIDOR 06/02/2022
FHWA FMIS 3.0 SIGNATURE HISTORY
CALTRANS SIGNATURE HISTORY
DOCUMENT TYPE SIGNED BY SIGNED ON
AMEND/MOD LIMA, WISHING 11/12/2023