CITY OF MERCED PROJECT NO. CP220061
CHANGE ORDER NO. 3
DATE: June 27, 2024
PROJECT NAME: Community Park 42
PROJECT LOCATION: Merced, California
CONTRACTOR: American Paving Company
ADDRESS: P.O. Box 27587, Fresno CA 93729
REASON FOR CHANGE ORDER:
Adis, and orional wordinal soccer fields, 2 baskrall ours. Quantiy adjustment for aditional asphat per the contract uni pric. Add Musco THE NUMBER OF WORKING DAYS WILL BE ADJUSTED AS FOLLOWS: 35 SKETCH ATTACHED: Yes
DESCRIPTION OF CHANGE:
Quantity Adjustments
Item
No ltem Unit Quantity Unit Price
Concrete Flatwork (Site Finish 'A') Amount
39 SF -723 $ (6,217.80)
[Parking Lot Curbs - Vertical/Flush - (Site Feature 23) 8.60 s 49 LF -46 20.00
(920.00)
54 AC Dike
LF -116 18.00 $ (2,088.00)
69 ADA Ramp with Truncated Domes (Site Feature ' 18)
EA -11 1,300.00 (14,300.00)
94 1 Gallon Shrubs EA -18 $
19.40 (349.20)
Total for Quanity Adjustments: S (23,875.00)
Extra Work
Item
No Item Unit Quantity Unit Price
Amount
1 Chain Link Fence with concrete curb behind Soccer Goal (Site Feature '57') LF 542 $ 107.00 $ 57,994.00
2 Field Marker Identification Signage (Site Feature '58') EA 4 $ 1,900.00 7,600.00
3 Bench (Site Feature '11) EA
4 2,200.00 $ 8,800.00
4 Soccer Goal and Net (Site Feature '16) 4
EA 6,800.00 27,200.00
5 Soil Preparation & Amendment
SF 226,609 $ 0.23 $ 52,120.07
Turf Hydroseed - Sports Field Blend SF 226,609 $ 1.15 $ 260,600.35 7 1 Gallon Shrubs EA $ $
23 19.40 446.20
8 24" Box Trees EA 20
448.00 $ 8,960.00
Tree Root Barriers LF 208
6.00 $ 1,248.00
10 Landscape Maintenance Period (180 Days) 1
LS 15,000.00 $ 15,000.00
Install Musco Lights (4 Soccer Fields) LS 1 $ 1,076,400.00 1,076,400.00 $
12 Dual Post Football Goal (Field 2,3 & 4) Price Adjustment EA 6 $ 11,000.00 66,000.00 $
13 Extra Work to Regrade Parking Lot, Move Irrigation & Demo Concrete Curb LS 1 $ 37,600.00 37.600.00 40 Asphalt Parking Lot with striping (Site Finish 'B) SF 1420 $ 2.10 $ 2,982.00 102 B1#102 FDR-C Process SY 1538 19.25 $ 29606.50
$
Total for Extra Work 1,652.557.12
Total for Change Order No. 3 S 1,628,682.12
ORIGINAL CONTRACT AMOUNT: S 5,800,580.70
CHANGE ORDER #1 AMOUNT: 1,365,524.40
CHANGE ORDER #2 AMOUNT: 1,532,539.00
CHANGE ORDER #3 AMOUNT: 1,628,682.12
TOTAL PROJECT COST TO DATE: $ 10,327,326.22
1 ATTACHMENT NO. 1
FUNDS/ACCOUNTS VERIFIED:
CP220061 ARPA Prk&CS CON CIPImp-Lnd $ 1,628,682.12
FINANCE OFFICE DATE
A812
ACCEPTED DATE: 7/2/24
(CONTRACTOR) Stephen J. Poindexter, President & CEO
RECOMMENDED DATE: 7/8/24
7/9/24
RECOMMENDED DATE:
(PROJECT CHAMPION)
APPROVED Grain onwell DATE 7/15/2024
Аз т0 рыт
AUTHORIZED DATE:
(INTERINECITY MANAGER)
ATTESTED DATE:
(ASSISTANT/DEPUTY CITY CLERK)
(SEAL)
COMMUNITY PARK -42 STANDARD SPECIFICATIONS
CITY OFMERCED
BID ITEM DESCRIPTIONS
BID ITEM DESCRIPTIONS
The descriptions below are general descriptions and do not include estimated quantities. See plans and bid summary for estimated quantities. Estimated quantities are provided as a courtesy only. Actual numbers and quantities of symbols on plans prevail.
Bid Item 1 -Chain Link Fence with concrete curb behind Soccer Goals (Site Feature '57°):
The linear toot price bid for this item shall include all costs for purchase and installation of chain link fence panels, rails, posts, footings, concrete curb, and all hardware and fasteners in locations indicated on the Drawings. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
Bid Item 2 - Field Marker Identification Signage (Site Feature '58):
The unit price bid for this item shall include all costs for material purchase and installation of field location signage, and post and footing as indicated on the Drawings. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
Bid Item 3 - Bench (Site Feature '11'):
The unit price bid for this item shall include all costs for purchase and installation of benches, mounting hardware and adhesive, per plan details and in locations as indicated on the Drawings. The item also includes labor, materials and all other work required by the Drawings and Specifications which is notspecifically set forth in the Bid Form as a pay item.
Bid Item 4 - Soccer Goal and Net (Site Feature '16'):
The unit price bid for this item shall include all costs for purchase and installation of a dual soccer goal and net as indicated on the Drawings. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
Bid Item 5-Soil Preparation & Amendment:
The square foot price bid for this item shall include all costs for soil testing, purchase and installation of fertilizers, organic material and soil conditioners as indicated by soil laboratory tests (contractor responsibility) and as indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
Bid Item 6 - Turf Hydroseed- Sports Field Blend:
The square foot price bid for this item shall include all costs for soil testing, purchase and installation of fertilizers, organic material and soil conditioners as indicated by soil laboratory tests (contractor responsibility), and turf hydroseed as indicated on the planting plans, details and specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
Bid Item 7-1 Gallon Shrubs:
The lump sum price bid for this item shall include all costs for purchase and installation of fertilizers, fertilizer packs, as indicated by soil laboratory tests (contractor responsibility), and purchase and installation of 1-gallon shrubs as indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
COMMUNITY PARK -42 STANDARD SPECIFICATIONS
CITY OFMERCED
Bid Item 8 - 24" Box Trees:
The unit price bid for this item shall include all costs for purchase and installation of fertilizers, fertilizer packs, as indicated by soil laboratory tests (contractor responsibility), stakes, tree ties, and purchase and installation of 24" box trees as indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
Bid Item 9 - Tree Root Barriers:
The linear foot price bid for this item shall include all costs for purchase and installation of root barriers as indicated on planting plans and details. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
Bid Item 10 -Landscape Maintenance Period (180 Days):
The lump sum price bid for this item shall include all costs for maintaining installed landscape areas for a period of 180 days as indicated on the Drawings as well as replacements for plants and equipment. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
Bid Item 11-Electrical with Musco Lights:
The lump sum price bid for this item shall include all costs for purchase and installation of a fully functional electrical powerand lighting system, Musco field lights, including switchboard, panels, transformers, grounding, conduits, pullboxes, conductors, light fixtures (including poles), devices and equipmentas indicated on the Drawings and Specifications within Division 26. For light poles and structures listed as bid alternate within this contract, the bidder shall provide a N16 pullbox at the termination point/location as part of base bid. This item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
END OF SECTION
2 315 North Thorne Avenue American Paving Co. Telephone: 559-268-9886 PO Box 27587 Fax: 559-268-2908
Fresno, Ca 93729
June 13, 2024
City of Merced
678W. W.18th Street
Merced, CA 95340
Attn: Joe Cardoso, PLS
Project: Community Park 42
Subject: PCO #5 - Revisions to Parking Lot & Curb Grades, & futsal court grades Please find the below pricing. APC will provide all labor, equipment, materials, bonds, and incidentals to furnish and install the revisions to the parking lot, & grade changes at the curbs and futsal court.
Item Description QTY U.M. Unit Price Total
Project Manager Supervision - APC 5 DA $355.30 $1,776.50 Foremen Supervision - APC DA $1,114.35 $5,571.75
Prime Bond - APC LS $150.24 $150.24
Labor Escalation - APC LS $319.65 $319.65
Overhead - APC LS $2,556.01 $2,556.01
Profit - APC LS $2,302.85 $2,302.85
Demo Concrete Curbs LS $2,596.99 $2,596.99
Regrade Curbs, Parking lot, Drive
1 LS $12,837.01 $12,837.01
Entrance, Futsal Court
Move Irrigation Conduit & Boxes in
1 LS $7,000.00 $7,000.00
Parking Lot Planters (Fresno Landscape)
Re-Stake Drive Entrance & Planters
1 LS $2,489.00 $2,489.00
(ESP)
102 BI #102 FDR-C Process 1538 SY $19.25 $29,606.50
Asphalt Parking Lot with striping (Site
40 1420 SF $2.10 $2,982.00
Finish 'B')
39 Concrete Flatwork (Site Finish *A') -723 SF ($8.60) (S6,217.80) Parking Lot Curbs- Vertical/ Flush- (Site
49 Feature '23') -46 LF ($20.00) ($920.00)
AC Dike -116 IF ($18.00) ($2,088.00)
94 1 Gallon Shrubs -18 EA ($19.40) ($349.20)
Total $60,613.50
APC will require an additional 5 working days be added to the contract duration in order to complete this work. Should you have any questions, please do not hesitate to contact us at (559) 268-9886.
American Paving Co.
Chris Williams
Chris Williams
Project Manager
An Affirmative Action / Equal Opportunity Employer Lic. No. 181430 Member Associated General Contractors of America
HUAT MATCHLINE C - THIS SHEET
/ 162.12
A4BP9.
MATCHLINE *B"
SEE SHEET C1.1
MATCHLINE "A" - SEE SHEET C1.1 SHINK
45-1858
2V/C 107.47 16-1192 S-182 5-13 MATCHLINE "D* - SEE SHEET C1.4 8 1808-
3M 110.42 V 10800
O DELL
ENGINEERING
1.118.72
818% PY 181,21
LOCATION MAP
BE 187.49
MATCHLINE 'C' - THIS SHEET
DATE Underground Service Aler
PROJECT# 122061
City of Merced
LANDSCAPE IMPROVEMENT PLANS
BEFORE
YOU DIG GRADING PLAN C1.3
ENGINEERING COMMUNITY PARK-42
1(800) 227 - 2600 BID SUBMITTAL AS SHOW 12 e75
MATCHLINE *D* - SEE SHEET C1.3
-----
# 18710
PV/00 164.47
-L
прой 1977h
GRADING ADDITIVE ALTERNATE • SEE SHEET C1.6 -----1-
2-189
SCALE * •20
71822
MISSION AVE O DELL
ENGINEERING
LOCATION MAP
0. DATI
City of Merced PROJECT# 122061
BEFORE LANDSCAPE IMPROVEMENT PLANS
GRADING PLAN 01/12/2023
YOU DIG ENGINEERING COMMUNITY PARK-42 C1.4
ce TOLL reCE 1(800 | 227-2600
570 w. 180h Pree 200: 25-6041 BID SUBMITTAL
315 North Thorne Avenue American Paving Co.
Telephone: 559-268-9886
PO Box 27587 Fax: 559-268-2908
Fresno, Ca 93729
February 14, 2024
City of Merced
678 W. 18" Street
Merced, CA 95340
Attn: Joe Cardoso, PLS
Project: CO H4 - sco fil righting package - R1
Subject:
Please find the below pricing. APC will provide all labor, equipment, materials, bonds, and incidentals to furnish and install the Musco field lighting package. Including switchboard, panels, transformers, grounding, conduits, pull boxes, conductors, light fixtures (including poles), foundations, devices and equipment as indicated on the attached drawing.
Item Description QTY | U.M. Unit Price Total
1 Furnish and install Musco field lighting
1 LS $1,076,400.00 $1,076,400.00
package
Total $1.076,400.00
Please note that APC requires an executed change order by April 1" 2024 in order to guarantee this pricing. Pricing is subject to change after April 1" 2024.
APC will require an additional 30 working days be added to the contract duration in order to complete this work.
Should you have any questions, please do not hesitate to contact us at (559) 268-9886.
American Paving Co.
Chris Williams
Chris Williams
Project Manager
An Affirmative Action / Equal Opportunity Employer Lic. No. 181430 Member Associated General Contractors of
America
Portion of Bid Item 8 - Electrical with Musco Lights
SECTION 26 56 68 SPORTS FIELD LIGHTING
PART - GENERAL
1.01 Related Documents
Drawings and general provisions of the bid documents, including general and supplementary conditions apply to this section.
Description of Work
A. The Sports Lighting section includes:
1. Galvanized steel pole and luminaire mounting crossarms
2. LED Luminaires, with appropriate glare/spill light control
3. Remote driver enclosure
4. Pole Foundations
5. Control System
B. The purpose of this specification is to define the performance standards, product values features, required manufacturer's service responsibilities, and design standards for City of Merced Park (CP42) in Merced, CA.
1.03 Submittals
A. It has been predetermined that these project specifications are the minimum acceptable criteria for this project. Musco Sports Lighting LLC, Total Light Control - TLC for LED ™ technology is the only pre-approved equipment supplier.
B. Manufacturers requesting approval shall provide submittal information as per Section 1.03 D.
Submittal information must be received 10 days prior to bid opening, approved manufacturers will be notified by addendum.
C. Submit each item in this article according to the conditions of the contract and specification section.
Any deviations to the specification require the manufacturer to list and describe in detail such deviations. Failure to provide this information shall be grounds for immediate rejection.
D. Submittal information required:
1. Light scans as per Section 1.04 of the specification.
2. Spill scans as per Section 1.05 of the specification.
3. Detailed warranty information as per Section 3.01 of the specification.
4. Detail foundation design as described in Section 2.01
5. Provide written information for the automated control system to include monitoring. Also provide examples of system reporting and access for numbers for personal contact to operate the system.
6. The manufacturer must submit evidence in the form of a letter from a California Licensed structural engineer that the manufacturer has the ability to confirm to the California Title 24 structural design requirements. The manufacturer must provide five (5) similar pole submittal project reviews approved by the California Division of State Architecture's office in the past two (2) years. The examples are to include the D.S.A. file numbers.
7. Lighting Manufacturer will supply certified photometric reports from Independent Testing Lab (ITL) or a Certified Lab along with an aiming angle summary for verification.
1.04 Sports Lighting Performance
A. Illumination Levels and Design Factors: The illumination levels specified shall be based on light levels for 25 years. Light levels shall not drop below specified targeted lighting levels during the specified warranty period. Appropriate light loss factors shall be applied and submitted for the Area of Lighting Light Levels Uniformity #of Points Size of Area Grid Spacing Soccer Fields 1-3 30 footcandles 2.5:1 88 330' × 225 30' × 30'
1.05 Spill And Glare Analysis
A. Submitted spill/glare computer models shall depict the field test stations at the property line. The test stations shall be shown every 30' along the line with the field lights on. Bidder shall submit, as described below:
1. Horizontal footcandles: No single point shall exceed 2.5 footcandles. Models shall represent readings taken with the meter positioned horizontal 36 inches above grade.
2. Vertical footcandles: No single point shall exceed 2.75 footcandles. Models shall represent readings taken with the test cell positioned 36 inches above grade and aimed at the brightest light source.
3. Candela Readings: At 150' from the field line at 3' above grade, the max candela reading (by fixture) shall not exceed 9,100(candela). Readings taken with all fields illuminated.
B. MATERIALS
A. Pole Structural Steel
1. The pole shafts shall be high strength low alloy tapered tubular steel that is equal to current ASTM A595 standards, with galvanized coating inside and out. All connections of pole sections shall be by slip fitting the top section over the lower section by a length of at least 1.5 times the diameters.
2. Steel components of the poles shall be hot dip galvanized t current ASTM A-123. Steel portions of the pole shall be constructed such that all segments of the pole can be readily heated to like temperatures in commercially available galvanizing methods.
3. To avoid problems of galvanize adherence to differing steel alloys, all steel components used for the pole must be of the same type steel.
4. All exposed steel components of the pole shall be at least 18" above the surface of the ground to avoid exposure of the steel to the heavily moisture and oxygen laden air, both above and below the surface. There shall be a cap to cover the top of the pole so that rain will not enter the interior of the pole.
5. To avoid stress corrosion of the pole, there shall be no weld points of the steel portion of the pole within 18" of the ground. The pole shall be galvanized steel.
6. The poles for this project have been designed to withstand 95 mph winds based upon CBC-C standards. The premise of the wind speed criteria will be the 50 year mean recurrent isotach wind map. Applicable gust factors to be applied per code.
B. Foundation Design
1. The Manufacturer shall provide a stamped foundation design, prepared by a Structural Engineer, licensed in the State of California.
2. The foundation design shall be based upon recommendations contained in the Geotechnical Report furnished by the Owner. If a Geotechnical Report is not provided by the Owner, the foundation design shall be based on soils that meet or exceed those of a Class 5 material as defined by the 2022 CBC Table 1806.2.
3. It is the contractor's responsibility to notify the owner of soil conditions other than the design criteria. The owner shall then be responsible and absorb the additional costs associated with:
Providing engineered foundation embedment design by a registered engineer in the State of California for soils other than specified soil conditions. Additional materials required to achieve alternate foundation. No direct burial steel poles allowed.
4. Lightning Protection: Manufacturer shall provide integrated lightning grounding via concrete be UL Listed per UL 96 and
UL 96A. If grounding is not integrated into the structure, the Manufacturer shall supply grounding electrodes, copper down conductors and exothermic weld kits. Electrodes and conductors shall be sized as required by NFPA 780. The grounding electrode shall be not less than 5/8 inch diameter and 8 feet long, with a minimum of 10 feet embedment. Grounding electrode shall be connected to the structure by a grounding electrode conductor with a minimum size of 2 AWG for poles with 75 feet mounting height or less, and 2/0 AWG for poles with more than 75 feet mounting height.
C. LED Sports Lighting Fixtures:
The lens is permanently sealed to keep optics away from harmful environmental elements.
Fixture is vented and filtered to adapt to environmental elements. Heat sink with a unique convective air cooling design with high thermal conductivity and corrosion resistant construction.
Machine mounted surface for maximum heat transfer of diode assembly and maintains low LED junction temperature during high wattage operation. Custom high power diode package with a metal core printed circuit board. The light control visors are factory aimed. Controls and directs more light onto the field which reduced glare and spill and enhances the on-field playability.
Fixture is powder coated gray.
D. Remote Electrical Enclosure:
Remote drivers and supporting electrical equipment shall be mounted approximately 10 feet above grade in aluminum enclosures. Drivers are remote for ease of installation and servicing.
The enclosures shall be touch-safe and include drivers and fusing with indicator lights on fuses to notify when a fuse is to be replaced for each luminaire. Disconnect per circuit for each pole E. Wire Harness: Spiral wound, abrasion protection sleeve, strain relief, plug-in connections F. Energy Consumption: The average kWh consumption for the entire facility shall not exceed
76.33kW for the lighting system.
G. Controls and Monitoring System:
1. Factory assembled lighting control cabinet (LCC) - The LCC shall be assembled and wired by a UL listed panel builder. The LCC shall contain Contactors, Monitoring and Control System and door mounted Manual off-on-auto selector switches. The LCC shall arrive at the job site ready to attach to an existing wall, switchgear, or a free standing enclosure. a. Control Wire Terminations - The Control Wire Terminations shall include UL listed terminal blocks mounted on a DIN rail and 250 volt, 16 amp, touch safe type fuse holders.
b. The ECE shall be constructed of aluminum and shall be powder coated gray. The cabinet door shall utilize a lockable, 3 point latching assembly that provides a NEMA 4 rated seal.
c. Contactor Modules - Contactors shall be UL listed for lighting applications. They shall be rated at full capacity, be electrically held, utilize a 120 volt coil and be rated for operation in a ambient temperature range from -40 degrees C to +70 degrees C. d. Manual off-on-auto Selector Switches - For on site manual control, three position selector switches shall be factory mounted to the ECE door. The switches shall be keyed and maintain position, with make before break contacts. The switches shall be factory wired to control terminal blocks.
e. Warranty - The LCC shall be covered under the standard warranty for the accompanying lighting equipment.
2. Remote Monitoring System: System shall monitor lighting performance and notify manufacturer if individual luminaire outage is detected so that appropriate maintenance can be scheduled. The manufacturer shall notify the owner of outages within 24 hours, or the next business day. The controller shall determine switch position (manual or auto) and contactor status (open or closed). The Monitoring System shall be factory wired to control terminal blocks.
3. Remote Lighting Control System: The Lighting Control System shall allow owners and users with a security code to schedule on/off system operation via a web site, phone, fax or email up to ten years in advance. Manufacturer shall provide and maintain a two-way TCP/IP communication link. Trained staff shall be available 24/7 to provide scheduling support and assist with reporting needs. The Light Control System shall be factory wired to control terminal blocks.
3.01 Warranty
A. 25-Year Warranty: Each manufacturer shall supply a signed warranty covering materials and labor for the entire system for 25 years from the date of shipment. Warranty shall specify light levels, system energy consumption, monitoring, maintenance and control services, spill light control, and structural integrity. Manufacturer shall maintain specifically-funded financial reserves to assure fulfillment of the warranty for the full term. Warranty does not cover weather conditions events such as lightning or hail damage, improper installation, vandalism or abuse, unauthorized repairs or alterations, or product made by other manufacturers.
3.02 Field Technician
A. Manufacturer shall have available a local factory trained technician to provide project support including but not limited to: Lamp replacement, confirm luminaire, aiming points, troubleshoot, and educate customer maintenance personnel.
City Of Merced Park
Merced,CA
Lighting System From Hometown to Professional
Pole / Fixture Summary
Pole 10 Meg Height! Luminaire Type Load Cireult
S1-S4 TLC-LED-1500 4.23 kW
TLC-LED-900 1.76 kW
S5-S6, S8 TLC-LED-1500 4.23 kW
TLC-LED.900 1.76 kW
TLC-LED-1200 1.17 kW
TLC-LED-1500 4.23 W
TLC-LED-900 0.88 kW
S0. S12 TLC-LED-1500 423 W
TLC-LED-900 1.76 kW
S10-511 TLC-LED-1500 4.23 KW
TLC-LED-1500 4.23 KW
TLC-LED-900 1.76KW
TLC-LED-000 1.76 kW
S13-$14 TLC-LED-1500 4,23 kW
TLC-LED-900 176 AW
96.13 AW
Circuit Summary
00c00F 23,96 kW
Soccer 2 24 25 kW
Soccer 3. 23,96 KW
Soccer 4 23.96 kW
Fixture Type Summary
Wettese I Quentity
TLC-LED-900 LED 5700K - 75 CRI 880W 104,000 >120,000 >120,000 >120,000 TLC-LED-1500 LED 5700K - 75 CRI 1410W 181,000 >120,000 >120,000 >120,000 TLC-LED-1200 LED 570OK - 75 CRI 1170W 150,000 >120,000 >120,000 >120,000 Single Luminaire Amperage Draw Chart
Driver (90 min power factor) Max Line Amperage Per Luminaire Single Phase Veltage (00 120)
TLC-LED-900 4.5 3.9 E 2.9
TLC-LED-1500 8.4 7.9| 7.3 6.3 5.0
TLC-LED-1200 6.9 6.5 6.052
Light Level Summary
Colculation Grid Summary
Grid Name Calculation Matric Circuits Fixture Oty
Property Line Spil Horizontal 0.05 0.00 AB.C.D.E.F
Property Line Spil Max Candela (by Fixture) 3734 0.00 AB.C.D.E.F Property Line Spil Max Vertical Ruminance Metric 0.12 0.00 AB.C.D.E. F Soccer 1 Horizontal illuminance 30.6 1.36 1.18
Soccer 2 Horizontal Illuminance 30.7 1.54
Soccer 3 Horizontal luminance 30.8 1.23
Soccer 4 Horizontal luminance 30.3 1.54 1.32
musco
We Make It Happen.
ENGINEERED DESIGN By: Aaron Rose • File #218073C • 06-Feb-24
PROJECT SUMMARY
ILLUMINATION SUMMARY
ENGINEERED DESIGN By: Aaron Rose • File #218073C • 06-Feb-24 We Make It Happen. Port beatene time in are relative
SCALE IN FEET 1: 50
Marting
33 35 31 26 26. W 35- 34
S4 M
30 30 30, 30 30 33- 30
56L
31 34 31, 31 34+ 34 31
29 30 33 31, 33, 31 30 29
31 29, 29 28. 31 28
located within 3 feet (Im) of design locations. 28 31 27 27, 27x 27 31 28 nominal voitage at line side of the driver and structures Installation Requirements: Results assume : 3%
for electrical sizing.
Draw Chart and/or the Musco Control System Summary" 28 31 28 29, 28 31 28 Electrical System Requirements: Refer to Amperage
in accordance with IESNA RP 6-15.
trom computer calculated predictions and should be taker Field Measurements: individual field measurements may vary 29 30 33 31, → 31 33 30 29
includes a 0.95 dirt depreciation factor.
is guaranteed per your Musco Warranty document and
Guaranteed Performance: The ILLUMINATION described above Total Load: 23.96 kW 31 31. 34, 31 34 31
No. of Luminaires: 20
Applied Circuits: A
LUMINAIRE INFORMATION
No. of Points:
33 30. 30, 30 30. 33. 30 S1 k
UG (adjacent pts):
Max / Min:
CE Guarantee Na/ Min
34 31 26- 26- 31. 35. 33
Minimum:
Maximum:
30.59 Guaranted Average a
Entire Grid
MAINTAINED HORIZONTAL FOOTCANDLES
ILLUMINATION SUMMARY
Height: 3.0' above grade
Spacing: 30.0'x 30.0
Size: 330 x 225
Name: Soccer 1
GRID SUMMARY
TLe 1E0-1500 31-55
Merced,CA LOCATOR
City Of Merced Park
ENT LIST FOR AREAS SHOWI
ILLUMINATION SUMMARY
ENGINEERED DESIGN By: Aaron Rose • File #218073C - 06-feb-24 We Make It Happen. 100
SCALE IN FEET 1: 50
31 33 26. 23 23 29 35 30
32 34 28, 129 29- 32 28
33 35 35 29. 29 32. 32 30
34 35 36 30. 29 31 29 29
33 32 28 32. 28
33 36. 30 29, 28%- 29 32. 27
located within 3 feet (1m) of design locations.
nominal voltage at line side of the driver and structures istanation Requirements, Results assume : 5%
or crectrical siting
Draw Chart and/or the "Musco Control System Summary" 31 30 28 28 30 32. 28 Electrical System equirements. herer to amperes
in accordance with IESNA RP-6-15.
Field Measurements: Individual field measurements may vary 30 32 32 27. 27. 32. 32. 29 includes a 0.95 dirt depreciation factor
is guaranteed per your Musco Warranty document and
Sustanted Penorance the tomaton described soone
35 32. 29, 28 32 32. 35
no. of minter 20
LUMINAIRE INFORMATION
No. of Points 33 tr 31 31 33. 31
1.49 UG (adjacent pts):
Max / Min:
Guaranteed Max / Min:
Avg / Min: 30 32 26 26- 30
30.70 Scan Average:
Guaranteed Average:
Entire Grid
MAINTAINED HORIZONTAL FOOTCANOLES
ILLUMINATION SUMMARY
330: TOTALL
Height: 3.0 above grade TLC-LED-900
Spacing: 30.0 x 30.0
TLC-KED-1500
GRID SUMMARY
35-56
Merced,CA LOCATION
CRACK
City Of Merced Park Pole
EQUIPMENT LIST FOR AREAS SHOWN
EQUIPMENT LIST FOR AREAS SHOWN
City Of Merced Park
Merced,CA
TC10900
la GRID SUMMARY
2/2 Name: Soccer 3
3/2 Size: 330 x 225
TIC-LED-1500 3/3° Spacing: 30.0° × 30.0°
1O400-1300 Height: 3.0' above grade
TLC-LEO-900 • o
TOTALS ILLUMINATION SUMMARY
* This structure ublizes a back-to-back mounting configuration MAINTAINEO HORIZONTAL FOOTCANDLES Entire Grid
Guaranteed Average:
Scan Average: 30.84
Maximum:
Minimum:
30 36. 30. 27 28 30 35 31 Guaranteed e/Mai
Max / Min: 1.52
UG (adjacent pts):
S10 0.83
30 30. 30. 32 31 No. of Points:
LUMINAIRE INFORMATION
Applied Circuits: C
No. of Luminaires: 20
33 36. 36- 33 33. 32 Total Load: 23.96 kW
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.
30 33 37+ 33 33, 35 30 27 Field Measurements: Individual heid measurements may vary am compoter dacoited predictions and should be toler
in accordance with IESNA RP-6-15.
Electrical System Requirements: Refer to Amperage
27 32. 31 31 30, 28 29 26 Draw Chart and of the "Musco Control System Summary" for electrical sizing
Installation Requirements: Results assume : 3%
nominal voltage at line side of the driver and structures 27 32 28. 26 ocated within 3 teet (Im) of design locations. 21% 26 27 31. 8
26 32 27 27, 28 33 27
30 32. 34+ 29 29, 33. 32 31
32 34. 30. 31, 35. 35 34
31 32 29 30; 34 34 14
30 33 26. 25 25 28 34 29
USCO
SCALE IN FEET 1: 50 Lighting
pose locates) desis sins are relate
lo 0,0 reference points) We Make It Happen.
ENGINEERED DESIGN By: Aaron Rose • File #218073C • 06-Feb-24
ILLUMINATION SUMMARY
EQUIPMENT LIST FOR AREAS SHOWN City Of Merced Park
Pole
JOUNTING Merced,CA
TIC LED 90O
GRID SUMMARY
TLC-LED-1500 Name: Soccer 4
N W Size: 330 x 225
Spacing: 30.0° × 30.0°
•Noo0oS Height: 3.0' above grade
ICEED 900
BLO-LED 1900
ILLUMINATION SUMMARY
MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Guaranteed Average:
Scan Average: 30.27
Maximum:
Minimum:
31 28 23- 24- 29 E
25 Max / Min:
UG (adjacent pts):
S13 0.81
34 30. 28 29, 33 No. of Points:
LUMINAIRE INFORMATION
Applied Circuits: F
No. of Luminaires: 20
Total Load: 23.96 kW
34 33 - 28 29, 35 32
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document and
includes a 0.95 dirt depreciation factor.
33 33 32. 28 30 28 Fleid Measurements: Individusl field measurements may vary from computer calculated predictions and should be taken in accordance with IESNA RP-6-15.
29 34 21, 28 30 25
for electrical sizing
Installation Requirements: Resuits assume + 3%
nominal voltage at line side of the driver and structures 25 31 located within 3 feet (1m) of design locations
28 26% 26, 27 31 26
26 31 27 27, 27
28 30 31. 30 29, 32. 32 29.
32 33 35 31 32. 35 33 32
32 33 32 31 32
S14
32 29. 26 26 28 32
CALE IN FEET 1: 50
Poie location(s) → dimensions are relative
o 0,0 reterence points) We Make It Happen.
ENGINEERED DESIGN By: Aaron Rose - File #218073C • 06-Feb-24
ILLUMINATION SUMMARY
EQUIPMENT LIST FOR AREAS SHOWN
Pole. City Of Merced Park
LOCATION Merced,CA
31-54,38 nee los ngu.
$12-513 GRID SUMMARY
1040•8900 Name: Property Line Spill
spacing: 30.0
Height: 3.0' above grade
1 10 1500
TLC-LED-900 22%
Entire Grid
55-56,59 Scan Average:
1022012
his structure utilizes a back to back mounting configuration No. of Points:
LUMINAIRE INFORMATION
Applied Circuits: A, B,C, D, E, F
003.032.001.005.225 004 003 004 002 051.000.000 000 100.000.200.200.100.800 No. of Luminaires: 80 Total Load: 96.13 kW
Guaranteed Performance: The ILLUMINATION described
C above is guaranteed per your Musco Warranty
Fleld Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken S2 in accordance with IESNA RP-6-15.
Electrical System Requirements: Refer to Amperage
o su Draw Chart and/or the "Musco Control System Summary" for electrical sizing.
Installation Requirements: Results assume : 3%
nominal voitage at line side of the driver and structures located within 3 feet (1m) of design locations
nusco
S12 S14
alling.
SCALE IN FEET 1: 150
Poo retire die in are relative We Make It Happen.
ENGINEERED DESIGN By: Aaron Rose - File #218073C • 06-Feb-24
ILLUMINATION SUMMARY
EQUIPMENT LIST FOR AREAS SHOWN
City Of Merced Park
LOCATION Merced,CA
31-54,38 TLC:T:0.906
286383 TLC-LED-1500 GRID SUMMARY
1L10130 Name: Property Line Spill
$10 TIC LED 900
317 TICTED 1500
514
55-56,59 TLG-LED-1500
Scan Average: 0.0099
TOTAL
This Structure thiges a back to back mounting conguratio 0.12 Minimum: 0.00
No. of Points:
LUMINAIRE INFORMATION
Applied Circuits: A, B, C, D, E, F
No. of Luminaires: 80
Total Load: 96.13 kW
- 000
document.
i :: on serene had real his and rement ma any
in accordance with IESNA RP-6-15.
Installation Requirements: Results assume = 3%
nominal voitage at line side of the driver and structures located within 3 feet (1m) of design locations,
5.00 0 00
musco
S12
SCALE IN FEET 1: 150 вединод
150 We Make It Happen.
ENGINEERED DESIGN By: Aaron Rose • File #218073C • 06-Feb-24
ILLUMINATION SUMMARY
EQUIPMENT LIST FOR AREAS SHOWN
City Of Merced Park
Merced,CA
3494, 30 TIC-10 500
TLC-LED-1500 [GRID SUMMARY
TIC-LED-1500 Name: Property Line Spill
...
Spacing: 30.0°
Height: 3.0' above grade
0 1500 373° ILLUMINATION SUMMARY
ILG-LED-900 CANCELA (PER FIXTURE)
Scan Average: 321.0423
Maximum: 3733.76
Minimum:
No. of Points: 97
LUMINAIRE INFORMATION
Applied Circuits: A, B, C, D, E, F
No. of Luminaires: 80
Total Load: 96.13 kW
Guaranteed Performance: The ILLUMINATION described
above is guaranteed per your Musco Warranty
Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.
• 2 Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing
installation Requirements: Results assume = 3%
nominal voitage at line side of the driver and structures located within 3 feet (1m) of design locations.
S12 S11 MUSCO
SCALE IN FEET 1: 150 Ligning
polo retree one in are relater We Make It Happen.
ENGINEERED DESIGN By: Aaron Rose - File #218073C - 06-Feb-24
ILLUMINATION SUMMARY
City Of Merced Park
Merced,CA
EQUIPMENT LAYOUT
INCLUDES:
•Soccer 1
Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary'
for electrical sizing
Installation Requirements: Results assume t 3%
AGOE nominal voltage at line side of the driver and structures located within 3 feet (Im) of design locations.
EQUIPMENT LIST FOR AREAS SHOWN.
7 51-54.58 70 BORED 95
TOLD 190
SU ALL
TLC-LED-900
$10 TIC LED 900 2/2"
140-860-3300
1CLED 1500
TLCLED 900
$14 110100
$5.56.59
Lina tructure hises a back to back Touting congration
JE ORRIE CHAI
Line Amperage Per Luminaire
Single Phase Voltage 347350
TOLED: 1200 69|65 60 52 42 18 30
Socce SoccI
Ф
$12
musco
Hailing
SCALE IN FEET 1: 150
Poie locations) → dimersions are relative to 0,0 reference points) We Make It Happen.
ENGINEERED DESIGN By: Aaron Rose • File #218073C • 06-Feb-24
EQUIPMENT LAYOUT