AMENDMENT MODIFICATION SUMMARY - (E-76)
FEDERAL AID PROGRAM CALIFORNIA DEPARTMENT OF TRANSPORTATION DLA LOCATOR: 10-MER-O-MER THE TOO MERCED AT MCGREGOR ST, WINDSOR AVE, HOME AVE, WOODWARD AVE AND PARKWEST ST.
PREFIX: S0BS5(060)
PROJECT NO: TYPE OF WORK:
SEQ NO: CONSTRUCT PEDESTRIAN IMPROVEMENTS IN THE SOUTHWEST AREA PREV AUTH/ AGREE DATES:
STATE PROJ NO: 1022000237L-N FED RR NO'S: PE:
ALT. PROJ NO: PUC CODES: RV:
AGENCY: MERCED PROJ OVERSIGHT: ASSUMED/LOCAL ADMIN CON:
ROUTE: ENV STATUS / EIS 10/17/2021 SPR:
DISASTER NO: RW STATUS / DT: 1 06/28/2023 MCS:
TIP DATA INV RTE: OTH:
MCAG BEG MP:
FSTIP YR: 23/24 END MP: PROJECT END DATE (PED): 05/05/2026 STIP REF: 205-0000-0320 BRIDGE NO:
FSTIP ID CMAQ21-06
PROG CODE LINE NO IMPV TYPE FUNG SYS URBAN AREA URB/RURAL DEMO ID ZOES 10 15
Z0E3 30 01
EUNDING SUMMARY
PHASE PROJECT COST FEDERAL COST AC COST
PE PREV. OBLIGATION $39,729.00 $35,172.00 $0.00
PE $0.00 $0.00 $0.00
PE SUBTOTAL $39,729.00 $35,172.00 $0.00
RW PREV. OBLIGATION $0.00 $0.00 $0.00
RW THIS REQUEST $0.00 $0.00 $0.00
RW SUBTOTAL $0.00 $0.00 $0.00
CON PREV. OBLIGATION $0.00 $0.00 $0.00
CON CON THIS REQUEST $456,884.00 $404,479.00 $0.00
CON SUBTOTAL $456,884.00 $404,479.00 $0.00
OTH PREV. OBLIGATION $0.00 $0.00 $0.00
OTH OTH THIS REQUEST $0.00 $0.00 $0.00
OTH SUBTOTAL $0.00 $0.00 $0.00
TOTAL: $496,613.00 $439,651.00 $0.00
STATE REMARKS
05/31/2023 *eque de an is a request extend projecend date (PED) from 8/01/23 to 8/14124. Project progress has been slowed by negotiations with the utilities on the eventual relocation of their facilities. There are no 04/12/2024
05/14/2024 SEQ 3: Initial CON authorization. Obligating $404,479 of ZOE3 funds to CON. Agency is not requesting CE. PED changed to 05/05/26
FEDERAL REMARKS
Attachment 1
AUTHORIZATION
AUTHORIZATION TO PROCEED WITH REQUEST: CON PREPARED IN FADS BY: NORIEGA, JASMINE ON 2024-05-31 948-3755 FOR: CON REVIEWED IN FADS BY: LIMA, WISHING ON 2024-06-03 599-4988 DOCUMENT TYPE: AMOD SUBMITTED IN FADS BY: LIMA, WISHING ON 2024-06-04 FOR CALTRANS PROCESSED IN FADS BY: SIGNATURE, NOT_REQUIRED ON 2024-06-04 FOR FHWA E-76 AUTHORIZED DATE IN FMIS GRACE REGIDOR ON 2024-06-11 18:12:34.0 SIGNATURE HISTORY FOR PROJECT NUMBER 5085(060) AS OF 07/26/2024
FHWA FMIS SIGNATURE HISTORY
MOD # SIGNED BY SIGNED ON
JERILYNN FOGLE 06106/2024
JERILYNN FOGLE 06/06/2024
GRACE REGIDOR 06/11/2024
WAll HAYS 06/05/2023
WAII HAYS 06/05/2023
GRACE REGIDOR 06/12/2023
SHUN HUEY 06/01/2022
SHUN HUEY 06/01/2022
GRACE REGIDOR 06/02/2022
FHWA FMIS 3.0 SIGNATURE HISTORY
CALTRANS SIGNATURE HISTORY
DOCUMENT TYPE SIGNED BY SIGNED ON
AMEND/MOD LIMA, WISHING 06/04/2024