5. Circuit breakers with adjustable short-time function shall be provided with defeatable instantaneous adjustment and 30 cycle short-time withstand ratings.

Short-time withstand ratings shall be specified in rms symmetrical amperes, as shown on the drawings.

6. Local visual trip indication for overload, short circuit and ground fault trip occurrences shall be provided.

7. An ammeter to individually display all phase currents flowing through the circuit breaker shall be provided. Indication of inherent ground fault current flowing in the system shall be provided on circuit breakers with integral ground fault protection. All current values shall be displayed in True rms with 2% accuracy.

8. Long Time Pickup indication to signal when loading approaches or exceeds the adjusted ampere rating of the circuit breaker shall be provided.

9. The trip system shall include a Long Time memory circuit to protect against intermittent overcurrent conditions above the long time pickup point. Means shall be provided to reset Long Time memory circuit during primary injection testing.

10. Circuit breaker trip systems shall include an externally accessible test port for use with a Universal Equipment Test Set. The test set shall be suitable for testing all electric circuit breakers specified for this project. Circuit breakers shall not require disassembly for testing.

11. Provide one (1) Universal Equipment Test Set for this project job for final inspection.

12. The main circuit breaker shall have an arc energy reduction feature to reduce clearing time. The arc energy reduction feature shall be an energy-reducing maintenance switch with a local status indicator. When the switch is turned on it shall reduce the clearing time and sets the instantaneous pickup clearing time to be 2 times faster than the normal instantaneous pickup sensor amperage.

13. The main circuit breaker shall be rated to allow it to be backfed by a solar photovoltaic or other on-site electrical energy generation system.

2.4 DISTRIBUTION OVERCURRENT PROTECTIVE DEVICES
A. Distribution Circuit Breakers shall be NEMA AB 1, enclosed, Molded-Case Circuit Breakers, with lockable handles.

1. Frame size, trip rating, number of poles, and auxiliary devices shall be as indicated and interrupting capacity rating shall meet available fault current. 612
22-12479 SWITCHBOARDS 262413 - 6 of 7

2. Overcurrent devices shall be listed for application, including switching fluorescent lighting loads or heating, air-conditioning and refrigerating equipment.

3. Circuit breakers, 400A and larger shall be equipped with trip units interchangeable within frame size.

4. Circuit breakers that are 1200A or larger shall have an arc energy reduction feature to reduce clearing time. The arc energy reduction feature shall be an energy-reducing maintenance switch with a local status indicator. When the switch is turned on it shall reduce the clearing time and sets the instantaneous pickup clearing time to be 2 times faster than the normal instantaneous pickup sensor amperage.

5. Mechanical lugs and power-distribution connectors shall be provided for number, size, and material of conductors indicated.

B. Where indicated, equip compartments with mounting brackets, supports, bus connections, and appurtenances designed for future overcurrent protective device of types and ampere ratings indicated.

2.6 CUSTOMER METERING
A. Electronic digital true RMS sensing metering display for each main switchboard main and each feeder serving a busway.

2.7 POWER AND TRIP HISTORY MONITORING
A. System Description:

1. The customer 1% monitoring shall consist of a electronic Circuit Monitor and System Display, as described in Section 16910-1 - Electric Circuit Monitoring, installed as designated on the project drawings.

2. Provide a Square D PowerLogic Class 3020 CM 2350 circuit monitor with waveform capture provisions to monitor the main disconnect in the switchboard.

2.8 METERING TRANSFORMERS
A. All instrument transformers shall be UL recognized per Classification XODW2.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine area to receive switchboard to provide adequate clearance for switchboard installation.

B. Check that concrete pads are level and free of irregularities.

C. Start work only after unsatisfactory conditions are corrected. 613
22-12479 SWITCHBOARDS 262413 - 7 of 7

3.2 INSTALLATION
A. Install switchboard in accordance with manufacturer's written guidelines, the NEC, and local codes.

B. Support switchboards on concrete housekeeping bases, 6-inch nominal thickness.

C. Remove temporary lifting eyes, channels, and brackets and temporary blocking of moving parts from switchboard units and components.

3.3 CONNECTIONS
A. Connect switchboards and components to wiring systems and to ground as indicated and instructed by manufacturer.

B. Tighten electrical connectors and terminals, including screws and bolts, according to manufacturer’s published torque-tightening values. Where manufacturer’s torque values are not indicates, use those specified in UL 786A and UL 486B.

3.4 FIELD QUALITY CONTROL
A. Refer to Specification Section 269500, Electrical Acceptance Testing, for minimum required switchboard testing by Contractor and Independent Testing Agency.

3.5 ADJUSTING
A. Adjust all operating mechanisms for free mechanical movement per manufacturer's specifications.

B. Tighten bolted bus connections in accordance with manufacturer's instructions.

C. Adjust circuit breaker trip and time delay settings to values as instructed by the Engineer.

3.6 CLEANING
A. Upon completion of installation, inspect interior and exterior of switchboards. Remove paint spatters and other spots, dirt, and debris. Touch up scratches and mars of finish to match original finish.

END OF SECTION 262413
614
22-12479 PANELBOARDS 262416 - 1 of 5
SECTION 262416

PANELBOARDS
PART 1 - GENERAL

1.1 WORK INCLUDED
A. Furnish and install panelboards as herein specified.

1.2 REFERENCES
A. The panelboards and overcurrent protection devices referenced herein shall be designed and manufactured according to the following appropriate specifications.

1. NFPA 70 – 2019 California Electrical Code (CEC).

2. NEMA PB 1 - Panelboards

3. NEMA PB 1.1 – General Instructions for Proper Installation, Operation and Maintenance of Panelboards Rated 600 Volts or Less.

4. UL 489 - Molded Case Circuit Breakers.

5. UL 67 – Standards for Panelboards.

1.3 SUBMITTALS
A. Submittals for this Section shall be made according to the Conditions of the Contract, Division 01 Specification Sections and Specification Section 260100.

B. Shop Drawings

1. Submit Shop Drawings for each panelboard indicating front and side enclosure elevations with overall dimensions, conduit entrance locations and requirements, nameplate legends, one-line diagrams, equipment schedule and switchboard instrument details.

C. Test Reports

1. Submit certified reports of Independent Tests and Observations indicating and interpreting test results specified in Part 3 of this Section.

2. Submit calibration record for all testing devices used.

3. Submit certificates, signed by Contractor, certifying that Independent Testing Agency complies with requirements specified in Section 260100 / 269500, Article

1.2. D. Operation and Maintenance Data

1. Submit operation and maintenance data for panelboards to include in “Operations and Maintenance Instructions” manuals specified in Division 01 and 615
22-12479 PANELBOARDS 262416 - 2 of 5
Specification Section 260100, Article 1.6, including detailed manufacturer’s written instructions on adjusting overcurrent protective devices.

1.4 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, protect, and handle products in conformance with manufacturer's recommended practices as outlined in applicable Installation and Maintenance Manuals.

B. Each panelboard shall be delivered in individual shipping splits for ease of handling.

They shall be individually wrapped for protection and mounted on shipping skids.

C. Inspect and report concealed damage to carrier within their required time period.

D. Store in a clean, dry space. Maintain factory protection and/or provide an additional heavy canvas or heavy plastic cover to protect structure from dirt, water, construction debris, and traffic. Where applicable, provide adequate heating within enclosures to prevent condensation.

E. Handle in accordance with NEMA PB 1.1 and manufacturer's written instructions. Lift only by lifting means provided for this express purpose. Handle carefully to avoid damage to panelboard internal components, enclosure, and finish.

1.5 PROJECT CONDITIONS
A. Verify dimensions by field measurements.

B. Determine suitable path for moving switchboard into place considering project conditions.

C. Verify clearance requirements. Locate switchboard to meet installation tolerances.

D. Revise locations and elevations from those indicated as required to suit project conditions.

1.6 WARRANTY
A. Manufacturer shall warrant equipment to be free from defects in materials and workmanship for the lesser of one (1) year from date of installation or eighteen (18) months from date of purchase.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. This design is based on the use of equipment manufactured by Square D Company.

Subject to compliance with project requirements, equivalent products by one of the following manufacturers may be considered:

1. Square D Company;

2. General Electric Company;
616
22-12479 PANELBOARDS 262416 - 3 of 5

3. Eaton;

4. Siemens;

2.2 PANELBOARDS - GENERAL
A. Panelboards shall be provided as shown on plans and described herein.

B. Panelboard enclosures shall be a minimum of 20” wide and 5.75” deep unless otherwise shown. Panelboards shall be totally flat with flush keyed locks. Enclosures shall be NEMA 1 for panelboards that are installed indoors and NEMA 3R for panelboards that are installed outdoors. Where more stringent panelboard enclosure requirements are specified on the panel schedules, the requirements specified on the panel schedule shall be provided.

C. Fronts shall be cold rolled sheet steel painted with ANSI 61 gray enamel over a rust inhibitor. They shall be equipped with door, flush hinges, and flush proper cylinder tumbler lock, metal circuit card holder, and quarter turn adjustable trim clamps. Panel locks shall be keyed alike.

D. Panel shall consist of reinforced corrosion resistant galvanized sheet steel frame with silver plated copper bus bars and circuit breakers properly supported to prevent vibration breakage in handling. All terminals shall be solderless type suitable for specified conductors of size indicated.

E. Each panelboards shall have a full size neutral bus. The neutral bus shall be 200% rated when supplied from a double neutral feeder. Each panelboards shall also have a full size equipment ground bus. In addition to the equipment ground bus, provide an isolated ground bus when supplied from a feeder which includes an isolated grounding conductor.

F. Branch circuit breakers shall be molded case, bolt-on, and fully interchangeable without disturbing adjacent units. All 2-pole and 3-pole breakers shall have common trips.

Circuit breakers supplying Class 1 transformers shall be lockable in the off position.

G. Branch panelboards and overcurrent protection devices shall have a minimum short circuit rating of 10,000 RMS symmetrical AIC (120/208V).

H. Distribution panelboards and overcurrent protection devices shall have a minimum short circuit rating of 42,000 RMS symmetrical AIC (120/208V).

I. All Panelboards shall be fully rated as shown on Drawings; series-rating shall not be allowed.

J. Panelboards shall bear an Arc-Flash Hazard Warning label in accordance with CEC Article 110.16.

K. Breakers for switching lights shall be type SWD, rated for switching duty. Breakers for mechanical equipment shall be HACR type.

L. All spaces shall have hardware.
617
22-12479 PANELBOARDS 262416 - 4 of 5
PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine area to receive panelboards to provide adequate clearance for panelboard installation.

B. Check that working space is level and free of irregularities.

C. Start work only after unsatisfactory conditions are corrected.

3.2 INSTALLATION
A. Panelboards shall have, in addition to conduit shown on the drawings, two ¾” and three 1” conduits stubbed to nearest accessible attic space.

B. Panelboards shall be installed with the top of the trim at 6’-0” above the finished floor, unless otherwise indicated on the drawings.

C. Where space permits, panelboards shall be surface mounted where they are not visible to the public.

D. Panelboards shall have a typewritten circuit directory installed mounted behind plastic in a metal holder that is welded to the inside of each panel door. The type written circuit directory shall show circuit numbers and complete description of all outlets on each circuit and
E. An Arc-Flash Hazard Warning label shall be applied to each panelboard in accordance with CEC 110.16.

F. Labeling of all circuits at panelboards shall match the exact room names of each of the spaces. Verify exact room names with Owner prior to labeling.

G. Electrical loads shall be disaggregated into separate panelboards per the 2019 California Energy Code Section 130.5(b).

3.3 CONNECTIONS
A. Connect panelboards and components to wiring systems and to ground as indicated and instructed by manufacturer.

B. Tighten electrical connectors and terminals, including screws and bolts, according to manufacturer’s published torque-tightening values. Where manufacturer’s torque values are not indicates, use those specified in UL 786A and UL 486B.

3.4 FIELD QUALITY CONTROL
A. Refer to Specification Section 269500, Electrical Acceptance Testing, for minimum required switchboard testing by Contractor and Independent Testing Agency. 618
22-12479 PANELBOARDS 262416 - 5 of 5

3.5 ADJUSTING
A. Adjust all operating mechanisms for free mechanical movement per manufacturer's specifications.

B. Tighten bolted bus connections in accordance with manufacturer's instructions.

C. Adjust any circuit breaker trip and time delay settings to values as instructed by the Engineer.

3.6 CLEANING
A. Upon completion of installation, inspect interior and exterior of switchboards. Remove paint spatters and other spots, dirt, and debris. Touch up scratches and mars of finish to match original finish.

END OF SECTION 262416
619
22-12479 LIGHTING 265113 - 1 of 10
SECTION 265113

LIGHTING
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections shall form a part of this Section, with the same force and effect as though repeated here.

1.2 SCOPE
A. The Contractor shall provide, install, connect, commission, test and place into operation a complete lighting system in accordance with the requirements of 2019 California Energy Code, California Code of Regulations Title 24, Part 6, and as herein specified.

B. Basis of Design for lighting system: Lighting systems are primarily based on the use of dimmable LED fixtures as specified herein.

C. Provide lighting fixtures of sizes, types and ratings as indicated by Drawings and Schedules, including, but not limited to, housing, light emitting diode (LED) modules, LED drivers, reflectors, diffusers, emergency lighting units, starters, wiring, accessories, poles, pole bases and mounting hardware.

1.3 DEFINITIONS
A. A Fixture is a complete unit, exit sign, or emergency lighting unit. Fixtures include LED modules or lamps, as specified, and parts required to distribute light, position and protect LED modules, and connect and disconnect LED modules to and from the power supply.

B. An Emergency Lighting Unit is a fixture with integral emergency battery-powered supply and the means for controlling and charging the battery. It is also known as an emergency light set.

Emergency lighting units include ones with and without integral LED or lamp heads.

1.4 DESIGNATION
A. Unless otherwise shown on the plans, fixture type designation for an individual fixture shall be typical for similarly indicated fixtures within the entire room or defined area.

B. Unless otherwise shown on the plans, fixtures mounted in a continuous row shall be of the same type as any individually designated fixture within the row.

C. Where a fixture is undesignated on the plans, it shall be of the same type as fixtures of similar function within the room it is located or within similar rooms or areas. 620
22-12479 LIGHTING 265113 - 2 of 10

1.5 COORDINATION
A. Confirm compatibility and interface of other materials with luminaires and ceiling system.

Report discrepancies to the Architect or Electrical Engineer, and defer ordering until clarified.

B. Supply plaster frames, trim rings, and back boxes to other trades.

C. Coordinate with Division 21-25
to avoid conflicts between luminaries, supports, fittings, and mechanical equipment.

D. All fixtures shall be coordinated with the architectural reflected ceiling plan. If any discrepancies occur, the Architect or Electrical Engineer must be notified in writing before installation is started.

1.6 SUBMITTALS
A. Submittals for this Section shall be made according to the Conditions of the Contract, Division 01 Specification Sections and Specification Section 260100.

B. Product Data

1. Submit complete list of fixtures and manufacturer’s catalog cuts and installation instructions on each type of lighting fixture and component. Include data on LED modules, LED drivers, poles, accessories and finishes. Include details indicating compatibility with ceiling grid system.

2. Submit outline drawings indicating dimensions and principal features of fixtures and poles.

3. Submit manufacturer’s data on lighting control equipment and components. Include complete wiring diagrams, with wiring types and any installation limitations.

4. Submit battery and charger data for emergency lighting units.

C. Shop Drawings

1. Submit layout drawings of all non-standard or customized fixtures. Drawings shall include mounting and feed points and methods.

2. Submit wiring diagrams detailing wiring for control system specific to this Project and showing both factory-installed and field-installed wiring, and differentiating between factory-installed and field-installed wiring.

D. Operation and Maintenance Data

1. Submit operation and maintenance data for lighting control devices to include in maintenance manuals specified in Division 01 and Specification Section 260100. 621
22-12479 LIGHTING 265113 - 3 of 10

1.7 QUALITY ASSURANCE
A. Nothing in these Drawings or Specifications shall be interpreted as to permit any device, system, or work that is not in compliance with the current California Code of Regulations.

Where work is detailed and/or specified to a more restrictive standard or higher requirement, that standard or requirement shall govern such work. Applicable codes and regulations include, but are not limited to, the following:

1. Fixtures and emergency lighting units shall be certified by the manufacturer as meeting efficiency requirements prescribed under the test methods of the current California Code of Regulations Title 20, Appliance Efficiency Regulations.

2. All work, commissioning and testing shall fully comply with the 2019 California Energy Code.

1.8 WARRANTY
A. The Special Warranties specified in this Article shall not deprive the Owner of other rights the Owner may have under provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by the Contractor under requirements of the Contract Documents.

B. Special Warranty for Batteries

1. Submit a written warranty executed by the manufacturer agreeing to replace (includes material and labor) rechargeable system batteries that fail in materials or workmanship within the specified warranty period.

2. The Special Warranty Period shall be manufacturer’s standard but not less than 10 years after date of Completion. Full warranty shall apply for first year, and prorated warranty for last 9 years.

C. Special Warranty for Exterior Fixtures

1. Submit a written warranty signed by manufacturer and installer agreeing to replace external parts of lighting fixtures exhibiting a failure of finish within specified warranty period.

2. Failure of finish is defined as perforation or erosion of finish due to weathering or fading, staining, and chalking of finish color due to effects of weather and solar radiation.

3. The Special Warranty Period shall be five years from date of Substantial Completion.

D. Special Warranty for LED Modules and Drivers

1. LED modules and drivers shall be provided with a five year warranty including labor charges for replacement of defective LED modules and drivers. 622
22-12479 LIGHTING 265113 - 4 of 10
PART 2 - PRODUCTS

2.1 FIXTURES (General)
A. The fixtures described in the Lighting Fixture Schedule on the drawings are to be used as a standard of quality to be maintained. Substitute items of same function, performance, and appearance are acceptable in conformance with Section 260100, except where noted otherwise.

B. Provide fixtures complete with all fittings, LED modules, drivers, stems, hangers, and component parts to make a complete installation. Fixtures shall have a suitable interior means of grounding the enclosure.

C. All attaching devices for recessed or surface mounted fixtures mounted in the ceiling shall be of formed or rolled steel and of sufficient strength to prevent movement of fixture after installation.

D. The Architect, Electrical Engineer or Owner shall have the right to reject any damaged fixture, including any fixture with damaged or cracked finishes, broken or bent metal, damaged or broken lenses. Any fixture with an appearance deemed to be abnormal, may also be rejected by the Architect, Electrical Engineer or Owner. Rejected fixtures shall be removed and replaced with an undamaged fixture at no cost to the Owner.

E. Lenses shall be virgin acrylic, 0.125 inches thick minimum, unless otherwise noted.

F. There shall be no visible trademarks or monograms on the lighting fixtures.

G. The Contractor shall provide lay-in frames for all exposed “T” ceiling systems and flanged trims for plasterboard, spline or metal lathe and plaster ceiling systems. The Contractor shall provide plaster or mounting frames where required.

H. Doors, frames, and other internal access shall be smooth operating, free from light leakage under operating conditions, and arranged to permit re-lamping without use of tools. Arrange doors, frames, lenses, diffusers, and other pieces to prevent accidental falling during maintenance and when secured in operating position.

I. Minimum reflectance of reflecting surfaces shall be as follows, except as otherwise indicated:

1. White Surfaces - 85 percent.

2. Specular Surfaces - 83 percent

3. Diffusing Specular Surfaces - 75 percent

4. Laminating Silver Metallized Film - 90 percent
J. Fixtures installed in non-hazardous locations shall conform to UL 1598.

K. Light emitting diode (LED) equipment used in fixtures shall conform to UL 8750.

L. Exposed hardware shall be stainless steel.
623
22-12479 LIGHTING 265113 - 5 of 10

2.2 LED FIXTURES
A. LED Modules

1. Color Temperature: 4,000 Kelvin (K)

2. Color Consistency: 2-step MacAdams ellipse

3. Color Rendering:
a. Indoor Fixtures: 90 CRI, or greater
b. Outdoor Fixtures: 70 CRI, or greater

4. Dimming: LED modules shall be compatible with the 0-10VDC dimmable LED driver.

5. Light Distribution: As indicated on Lighting Fixture Schedule

6. Rated Life: 60,000-hours, with 90-percent lumen maintenance at 50-degrees C, in accordance with TM-21-11.

B. LED Drivers

1. LED Drivers shall be 0-10VDC dimmable and shall be compatible with the LED modules and provide the correct 0-10VDC control voltage.

2. LED Drivers shall be independently tested by Intertek and shall bear the ETL Listed Mark as proof of meeting the applicable published safety standards.

3. LED Drivers shall be independently tested and certified by Underwriters Laboratories (UL) to meet FCC Regulations Part 15 and Part 18 and NEMA standards regarding electromagnetic and radio frequency interference, shall bear the United States UL Listed Mark as proof of meeting the applicable published standards.

4. LED Drivers shall comply with ANSI C62.41, Category A and IEEE 587 standards regarding harmonic distortion and surge protection. Total Harmonic Distortion (THD) shall not exceed 20 percent.

5. LED Drivers shall comply with IEC standard 60929, Annex E and shall source no more than 2mA of control current at 0-10VDC.

6. LED Drivers shall be solid-state, electronic, high power factor (minimum 0.9).

7. LED Drivers shall have a Class A sound rating.

8. LED Drivers shall have internal thermal protection to limit driver case temperature to a maximum of 75-degrees C.

9. Ambient Operating Temperature Range: -40-degrees C to 55-degrees C.

10. Rated Frequency: 60-Hertz

11. Rated Life: 60,000-hours
C. Quality Control

1. Testing and measurement of LED lighting fixture performance shall comply with IES LM-79-08 and IES LM-82-12.
624
22-12479 LIGHTING 265113 - 6 of 10

2. Testing and measurement of LED and LED module lumen maintenance shall comply with IES LM-80-08.

2.3 NLIGHT ENABLED NETWORK LIGHTING FIXTURES
A. Lighting fixtures specified as nLight enabled shall have an integral nLight network interface and be integrated into the nLight network lighting control system.

2.4 EXTERIOR FIXTURES
A. Metal parts of exterior fixtures exposed to weather conditions shall be constructed of cast or spun aluminum, cast bronze, stainless steel or other nonferrous metals available to withstand exposure.

B. Steel fixtures installed in damp or wet locations shall have zinc-chromate or equal primer.

C. Provide gaskets on all trims and housings.

D. All exterior fixtures shall be supplied by a branch circuit that is controlled by an astronomic time clock that is programmed to automatically turn lights off during daylight hours.

2.5 EXIT SIGNS
A. Exit signs shall conform to UL 924.

B. Sign Colors and Minimum Letter Height shall be per local code.

C. Exit signs shall include arrows as indicated.

D. Exit signs shall have an integral emergency battery pack and shall include an integral automatic charger in a self-contained power pack. Battery shall be sealed, maintenance-free, nickel-cadmium type with special warranty. Charger shall be fully automatic, solid-state type with sealed transfer relay.

E. Lamps for AC operation shall be light emitting diodes with 20,000 hours minimum rated lamp life.

F. Operation: Relay automatically energizes lamp from unit when circuit voltage drops to 80 percent of nominal or below. When normal voltage is restored, relay disconnects lamps, and battery is automatically recharged and floated on charger.

2.6 EMERGENCY LIGHTING UNITS
A. Emergency Lighting Units shall conform to UL 924.

B. Emergency Lighting Units shall be self-contained with sealed, maintenance-free, lead-acid type battery with minimum 10-year nominal life and special warranty. Charger shall be minimum 2- rate, fully automatic, solid-state type, with sealed transfer relay. 625
22-12479 LIGHTING 265113 - 7 of 10
C. Operation: Relay automatically turns lamp on when supply circuit voltage drops to 80 percent on nominal voltage or below. Lamp automatically disconnects from battery when voltage approaches deep-discharge level. Relay disconnects lamps and battery and automatically recharges and floats on trickle charger when normal voltage is restored.

D. Where indicated, provide heavy-chrome-plated wire guard arranged to protect lamp heads or fixtures.

E. Provide time-delay relay in emergency lighting unit control circuit arranged to hold unit ON for fixed interval after restoration of power after an outage. Provide adequate time delay to permit HID lamps to restrike and develop adequate output.

2.7 EMERGENCY LED DRIVERS
A. Emergency LED Drivers shall conform to UL 924
B. Emergency LED Drivers shall be self-contained, modular, battery-inverter unit factory mounted within fixture body. Battery shall be sealed, maintenance-free, nickel-cadmium type with minimum 10-year nominal life. Charger shall be fully automatic, solid-state, constant-current type.

C. Emergency LED Drivers shall be provided with test switch and LED indicator light visible and accessible without opening fixture or entering ceiling space.

D. Operation: Relay automatically turns lamp on when supply circuit voltage drops to 80 percent of nominal voltage or below. Relay disconnects lamp and battery and automatically recharges when normal voltage is restored.

2.8 WET AND DAMP LOCATIONS
A. All lighting fixtures installed in damp locations shall have UL approved “wet” or “damp” location labels visible in interior of fixtures.

B. All lighting fixtures installed in wet locations shall have UL approved “wet” location labels visible in interior of fixtures.

PART 3 - EXECUTION

3.1 LIGHTING FIXTURES INSTALLATION
A. Continuous runs of fixtures shall be installed straight and true.

B. All new fixtures shall be securely anchored to prevent any possible chance of their falling.

C. The Contractor shall coordinate outlets with Acoustic Tile Contractor and other trades and locate outlets in center or at intersections of acoustical tile in all acoustical tile ceilings. All fixtures must be kept 1 ½” clear of all acoustic tile and any combustible material by use of approved spacers, unless Fire Underwriters approved to be surface mounted. 626
22-12479 LIGHTING 265113 - 8 of 10
D. All fixtures mounted in or on suspended ceilings shall be fastened to the ceiling framing members in accordance with CEC 410.36(B).

E. Recessed fixtures shall be complete with plaster frames, supporting brackets and hanger wires.

F. When lighting fixtures are equipped with integral emergency battery packs the fixtures shall be wired so that all lamps switch on and off via the room light switch and the emergency lamps are automatically energized if the normal power has failed.

G. Install equipment level and plumb and according to manufacturer’s written instructions.

H. Mounting heights indicated are to bottom of unit for suspended devices and to center of unit for wall-mounted devices.

I. Fixture installation shall conform to all applicable standards for installation, mounting, wiring, and quality.

J. All fixtures shall be grounded and bonded in accordance with applicable codes. Where fixtures are installed in rows, a bonding screw shall be used to maintain bonding integrity from fixture to fixture.

K. All fixtures, lenses, and other trim shall be aligned, cleaned, free of paint and blemishes before final acceptance.

L. Fixtures weighing more than 50 pounds shall be supported independent of the fixture box. All outlet boxes shall be able to support a minimum of eight pounds.

M. For fixtures weighting more than two pounds, support shall be provided at all four corners, plus the outlet box. Each support shall be able to carry a minimum of four times its intended load.

N. No support or insert, except pendant canopies, shall be visible from the floor.

O. Where fixtures are pendant suspended, the use of ball aligner and canopies at ceiling and fixture, stem, and other required mounting devices shall be required for installation as required to meet Title 24 requirements. A safety cable anchored to the roof structure shall be installed in all pendants. If any obstruction within the 45 degree swing of the fixture exists, the Contractor shall provide a State approved restraint system to prevent the fixture from swinging into the obstruction.

P. When fixtures are stem mounted, the variation in distance from the finished floor shall vary no more than ½” from the heights as specified on the plans.

Q. Pendant-Mounted fixtures mounting heights shall be to the bottom of the fixture. Mounting heights of the wall-mounted fixtures shall be to the center of the outlet box unless otherwise noted.

R. Provide surface-mounted fixtures with UL approval for direct mounting on the various ceilings, unless specified otherwise. Spacers will not be approved.

S. All fixtures shall be supported directly to building structural members or from bridging attached to the structural members, or shall have positive attached structural angles, and/or all-thread rod extensions from structure to ceiling plane. Fixtures and supports shall be laterally braced independently from suspended ceilings (hard or T-bar) utilizing 627
22-12479 LIGHTING 265113 - 9 of 10
structural angles at approximate 45 angles in two planes from ceiling plane to structure above.

Minimum rod size shall be ½” and minimum angle size shall be ¾” x ¾” x 3/16” unless noted otherwise in specific details. Provide all necessary blocking and hardware so that fixtures hang true, square, plumb, and in proper alignment.

T. Recessed fixtures in T-bar ceilings (CCR Title 24, part 2, Section 1616A.1.20)

1. All light fixtures shall be attached positively to the ceiling suspension systems by mechanical means per CEC Article 410.36 to resist a horizontal force equal to the weight of the fixture. A minimum of two screws or approved fasteners are required at each light fixture, per ASTM E580, Section 5.3.1.

2. Light fixtures weighing less than or equal to 10 lbs shall have a minimum of one #12 gage slack safety wire connected from the fixture housing to the structure above.

3. Light fixtures weighing greater than 10 lbs but less than or equal to 56 lbs may be supported directly on the ceiling runners, but they shall have a minimum of two #12 gage slack safety wires connected from the fixture housing at diagonal corners and anchored to the structure above.

4. Light fixture weighing greater than 56 lbs shall be independently supported by not less than four taut #12 gage wires attached to the housing and to the structure above. The four taut #12 gage wires, including their attachment to structure above, must be capable of supporting four times the weight of the unit.

U. Surface fixtures mounted to T-bar ceilings shall be bolted through ceiling panel to metal channel struts suspended between ceiling main runners. Install hanger wires per above from struts to ceiling.

V. Install flush mounted fixtures properly to eliminate light leakage between fixture frame and finished surface.

W. Provide plaster frames for recessed fixtures installed in other than suspended grid type acoustical ceiling systems. Brace frames temporarily to prevent distortion during handling.

X. Installation of Recessed Lighting Fixtures in Accessible-type Suspended Ceilings shall be such that the fixtures will exactly suit the type of ceilings used without altering the fixture or the ceiling. Each fixture shall be wired with a piece of flexible conduit sufficiently long to remove fixture enclosure from ceiling without disconnecting unit. Fixture manufacturer shall prepare drawing or catalog sheets in which all details of fixture installation are carefully analyzed.

Contractor to submit these shop drawings for approval. If clearance above “T” bar system is too restricted to “tip-in” fixture, the Electrical Contractor shall coordinate with acoustic ceiling installer by leaving one cross “T” off until the cross “T” shall be secured into its proper place.

Y. Where fixtures are installed in 1-Hour Rated Ceiling, Contractor shall provide gypboard “tents” above the fixtures to maintain the integrity of the 1-hour fire ceiling.

Z. Adjust aimable fixtures to provide required light intensities. 628
22-12479 LIGHTING 265113 - 10 of 10

3.2 FIELD QUALITY CONTROL
A. Refer to Specification Section 269500, Electrical Acceptance Testing, for minimum required lighting testing by Contractor.

END OF SECTION 265113
629
22-12479 LIGHTING CONTROL SYSTEMS 266100 - 1 of 13
SECTION 266100

LIGHTING CONTROL SYSTEMS
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections shall form a part of this Section, with the same force and effect as though repeated here.

1.2 SCOPE
A. The Contractor shall provide, install, connect, commission, test and place into operation a complete system of lighting control equipment in accordance with the requirements of 2019 California Energy Code, California Code of Regulations Title 24, Part 6, and as herein specified.

B. Basis of Design for lighting control systems: Lighting control systems are primarily based on the use of a distributed digital lighting management system for control of indoor lighting systems and astronomic time clock controls for outdoor lighting systems and sign lighting.

C. Provide lighting control equipment as indicated by drawings and schedules, including but not limited to, digital lighting management system dimming equipment, occupancy sensors, daylight sensors (photosensors), astronomic time clocks and multi-pole lighting relays and contactors and wiring.

D. Mandatory Indoor Lighting Controls:

1. Area Controls – Provide area controls in each space to facilitate the manual control of lighting within that space.

2. Multi-level controls – Provide multi-level controls to facilitate the uniform reduction of lighting energy used in each space. Multi-level controls shall be accomplished through dimming.

3. Automatic Shutoff Controls – Provide occupancy sensors in each space to automatically shut-OFF the lighting when the space is unoccupied.

4. Automatic Daylighting Controls – Provide daylight sensors in each daylit area and automatically control lighting fixtures within the daylit areas separately from the fixtures located in non-daylit areas.

E. Mandatory Outdoor Lighting Controls:

1. Outdoor incandescent lighting – Provide a motion sensor at each outdoor incandescent luminaire that is rated over 100-watts.

2. Controls for outdoor lighting – Outdoor lighting shall be controlled by an astronomic time-switch that automatically turns OFF the outdoor lighting when daylight is available. 630
22-12479 LIGHTING CONTROL SYSTEMS 266100 - 2 of 13

3. Motion Sensor Controls – Provide a motion sensor control at each outdoor lighting fixture that is located 24-feet or less above the ground; except lighting fixtures rated 40-watts or less.

F.Provide and install lighting control systems and equipment as indicated on drawings and schedules, including but not limited to, network lighting control system, network ceiling mounted occupancy sensors, network dimming manual control stations, network daylighting sensors (photosensors), network dimming control relays, network plug load control relays, network bridges, network gateways, network automated demand response control interface, network lighting control system integration for nLight enabled lighting fixtures, configuration tools, programming, configuration and documentation software, wall switches with integral occupancy sensors, emergency lighting control devices, astronomic time-switch controls and lighting control panels, photoelectric relays, and multi-pole lighting relays and contactors.

1.3 COORDINATION
A. Confirm compatibility and interface of lighting control equipment with lighting fixtures, LED drivers and ceiling systems. Report discrepancies to the Architect or Electrical Engineer, and defer ordering until clarified.

B. Coordinate with Division 21-25
to avoid conflicts between supports, fittings, and mechanical equipment.

1.4 SUBMITTALS
A. Submittals for this Section shall be made according to the Conditions of the Contract, Division 01 Specification Sections and Specification Section 260100.

B. Shop Drawings:

1. Composite wiring and/or schematic diagram of each control circuit as proposed to be installed.

2. Show exact location of all digital devices, including at minimum sensors, room controllers, and switches for each area on reflected ceiling plans.

3. Provide room/area details including products and sequence of operation for each room or area.

Illustrate typical acceptable room/area connection topologies.

4. Network riser diagram including floor and building level details. Include network cable specification and end-of-line termination details, if required. Illustrate points of connection to integrated systems.

Coordinate integration with mechanical and/or other trades.

C. Product Data: Catalog sheets, specifications and installation instructions.

D. Include data for each device which:

1. Indicates where sensor is proposed to be installed.

2. Prove that the sensor is suitable for the proposed application.

1.5 QUALITY ASSURANCE
631
22-12479 LIGHTING CONTROL SYSTEMS 266100 - 3 of 13
A. Nothing in these Drawings or Specifications shall be interpreted as to permit any device, system, or work that is not in compliance with the current California Code of Regulations. Where work is detailed and/or specified to a more restrictive standard or higher requirement, that standard or requirement shall govern such work.

Applicable codes and regulations include, but are not limited to, the following:

1. All lighting control devices and systems shall be certified by the manufacturer as meeting the requirements of the current California Code of Regulations Title 20, Appliance Efficiency Regulations.

2. All work, commissioning and testing shall fully comply with the 2019 California Energy Code.

1.6 CODES AND STANDARDS
A. All work and materials shall fully comply with current rules and regulations of all applicable codes. Nothing in these Drawings or Specifications shall be interpreted as to permit any work not in compliance with these codes.

Where work is detailed and/or specified to a more restrictive standard or higher requirement, that standard or requirement shall govern such work. Installation shall comply with the following codes and standards:

1. California Code of Regulations (CCR)
a. Title 8, Industrial Relations
b. Title 17, Public Health
c. Title 24, Building Standards

2. 2019 California Building Code.

3. 2019 California Fire Code.

4. 2019 California Electrical Code.

5. 2019 California Energy Code.

6. Local Codes.

7. ANSI/TIA/EIA-568-C-2012 Commercial Building Telecommunications Standard

8. ANSI/TIA/EIA-607-B-2013 Grounding and Bonding Requirements for Telecommunications in Commercial Buildings

9. BICSI TDMM Telecommunications Distribution Methods Manual 12 th Edition

10. NEMA VE1 Cable Tray Systems

11. NEMA VE2 Cable Tray Installation Guides

12. UL 467 Grounding and Bonding Equipment.

13. UL 1479 Fire Tests of Through-Penetration Firestops

1.7 WARRANTY
632
22-12479 LIGHTING CONTROL SYSTEMS 266100 - 4 of 13
A. The Warranties specified in this Article shall not deprive the Owner of other rights the Owner may have under provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by the Contractor under requirements of the Contract Documents.

B. Provide five-year manufacturer’s warranty on all digital lighting management system room control devices and panels.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. This design is based on the use of nLight network lighting controls equipment manufactured by Acuity Brands nLight. Subject to compliance with project and specification requirements, equivalent products by the following manufacturers may be considered if a complete substitution request including shop drawings is submitted and approved prior to bid.

1. Network Lighting Controls nLight

2. Cooper Greengate;

3. WattStopper;
B. System: Network Lighting Controls nLight

2.2 NETWORK CEILING MOUNTED OCCUPANCY SENSOR
A. Network ceiling mounted occupancy sensors shall be dual technology digital passive infrared and microphonic occupancy sensors.

B. Network ceiling mounted occupancy sensors shall include the following features:

1. Communicates with the nLight network;

2. Low voltage auxiliary relay rated 1-amp at 24VAC/VDC with 2#20 AWG wire leads;

3. RJ45 port, RJ45 splitter and Category 5e patch cable;

4. Physical Description: Size: 4.55” diameter, 1.55” deep; Weight: 6oz; Color: Matte White;

5. Mounting: Ceiling Tile / Gypsum board surface, or 3.5” octagonal box, or single-gang handy box; C. Network ceiling mounted occupancy sensors shall be nLight Network Lighting Controls communication compatible and powered through the nLight bus.

D. nLight product numbers: nCM PDT 9 RJB AR (in offices and spaces less than 250-square-feet); nCM PDT 10 RJB AR (in corridors and spaces greater than 250-square-feet); nCM PDT 6 RJB AR (only in spaces with ceiling height greater that 15-feet);

2.3 SINGLE-ZONE NETWORK DIMMING MANUAL CONTROL STATIONS A. Single-zone network dimming manual control stations shall include the following features:
633
22-12479 LIGHTING CONTROL SYSTEMS 266100 - 5 of 13

1. Communicates with the nLight network;

2. Two RJ45 ports;

3. Physical Description: Size: 2.74” high, 1.68” wide, 1.63” deep; Weight: 2oz; Color: Matte White;

4. Three buttons: “ON/OFF”; up arrow; and down arrow

5. Mounting: Single-gang, 2-3/4” deep switch box with single gang plaster ring, or multi-gang switch box with multi-gang plaster ring matching the number of control stations where multiple control stations are collocated.

B. Network dimming manual control stations shall be nLight Network Lighting Controls communication compatible and powered through the nLight bus.

C. nLight product number: nPODM DX; Coordinate device color with the architect and Owner prior to ordering.

Device shall be compatible with wall plates having decora style openings. Provide and install a decora style wall plate matching the switch color at each switch. Provide multi-gang wall plates at multi-gang switch locations.

2.4 DIGITAL KEYED SWITCH MANUAL CONTROL STATIONS
A. Digital keyed switch manual control stations shall include the following features:

1. Communicates with the nLight network;

2. Two RJ45 ports;

3. Physical Description: Size: 4” high, 1.3” wide, 1.63” deep; Weight: 2oz; Color: Matte White;

4. Key action: Return-to-center for momentary.

5. Pilot LED’s to indicate on or off status.

6. Mounting: Single-gang, 2-3/4” deep switch box with single gang plaster ring, or multi-gang switch box with multi-gang plaster ring matching the number of control stations where multiple control stations are collocated.

B. Digital keyed switch manual control stations shall be nLight Network Lighting Controls communication compatible and powered through the nLight bus.

C. nLight product number: nPOD KEY; Coordinate device color with the architect and Owner prior to ordering.

Device shall be compatible with wall plates having decora style openings. Provide and install a decora style wall plate matching the switch color at each switch. Provide multi-gang wall plates at multi-gang switch locations.

2.5 NETWORK DAYLIGHTING SENSORS
A. Network daylighting sensors shall be closed loop photosensors that measure the ambient light in the space and provide automatic dimming daylight harvesting capabilities for any 634
22-12479 LIGHTING CONTROL SYSTEMS 266100 - 6 of 13
load type connected to the network. Daylighting sensors shall be interchangeable without the need for rewiring.

B. Network daylighting sensors shall include the following features:

1. Communicates with the nLight network;

2. RJ45 port, RJ45 splitter and Category 5e patch cable;

3. LED indicator;

4. Physical Description: Size: 4.55” diameter, 1.55” deep; Weight: 6oz; Color: Matte White;

5. Mounting: Ceiling Tile / Gypsum board surface, or 3.5” octagonal box, or single-gang handy box; C. Network dimming manual control stations shall be nLight Network Lighting Controls communication compatible and powered through the nLight bus.

D. nLight Product Number: nCM ADCX RJB.

2.6 NETWORK DIMMING CONTROL RELAYS
A. Network dimming control relays shall automatically bind the room loads to the connected devices in the space.

The quantity of network dimming control relays shall be provided to match the number of control zones required in each space.

B. Network dimming control relays shall be the On/Off/Dimming type and include the following features:

1. Communicates with the nLight network;

2. One 120/240/277VAC, 16-amp, latching lighting relay;

3. Sinks 100mA; 0-10VDC dimmable LED drivers;

4. Two RJ45 ports;

5. LED indicator;

6. Physical Description: Size: 3.38” high x 2.53” wide x 1.83” deep + ½” chase nipple; Weight: 6oz; Color: White;

7. Mounting: Mount to a 5S x 2.5” deep large capacity outlet box; C. Network dimming manual control stations shall be nLight Network Lighting Controls communication compatible and powered through the nLight bus.

D. nLight Product Number: nPP16 (D).
635
22-12479 LIGHTING CONTROL SYSTEMS 266100 - 7 of 13

2.7 NETWORK PLUG LOAD CONTROL RELAYS
A. Network plug load control relays shall automatically bind a rooms controlled receptacles loads to the network occupancy sensor in the space.

B. Network plug load control relays shall include the following features:

1. Communicates with the nLight network;

2. One 120-volt, 20-amp, UL general purpose latching relay

3. Two RJ45 ports;

4. LED indicator;

5. Physical Description: Size: 3.38” high x 2.53” wide x 1.83” deep + ½” chase nipple; Weight: 6oz; Color: Blue;

6. Mounting: Mount to a 5S x 2.5” deep large capacity outlet box; C. Network dimming manual control stations shall be nLight Network Lighting Controls communication compatible and powered through the nLight bus.

D. nLight Product Number: nPP20 PL

2.8 PROGRAMMING, CONFIGURATION AND DOCUMENTATION SOFTWARE A. Programming shall be provided by the Contractor through a web-based suite of applications that gives the programmer the ability to remotely configure and monitor nLight network luminaires and nLight control devices.

B. The Contractor shall completely program and configure the lighting control system to comply with 2019 California Energy Code requirements.

C. Provide one nCOMKIT and commissioning tool interface; D. Communication Protocol: Programming software shall communicate with nGWY2 over LAN IP network and with nLight network directly through nCOMKIT and commissioning tool interface and shall be able to program up to 20,000 network controlled devices.

E. System Requirements: Laptop or PC with Windows 7 or newer operating system; 4GB RAM and 2GB minimum available memory; Internet Explorer 10 and newer, Chrome, or Firefox browsers.

F.Acuity Controls Product Number: SensorView 13, nCOMKIT

2.9 WALL SWITCH WITH INTEGRAL OCCUPANCY SENSOR
A. Wall switches with integral occupancy sensors shall be comprised of an all digital, passive infrared technology (PIR) sensor to detect human presence.
636
22-12479 LIGHTING CONTROL SYSTEMS 266100 - 8 of 13
B. System shall have field selectable auto-ON or manual-ON operating modes and shall be factory set to the manual-ON operating mode.

C. Wall switches with integral occupancy sensors shall be rated: 120/277-volt; 60Hz and shall have separate neutral and equipment grounding connection wire leads.

D. Wall switches with integral occupancy sensing shall be Sensor Switch model WSX (in Janitors closets and storage rooms having only one lighting fixture).

2.10 CONTACTORS AND AUXILIARY RELAYS
A. Contactors and relays shall comply with NEMA ICS 2.

B. Devices are electrically operated and mechanically held. Number of poles and ratings are as indicated.

Coordinate rating of each unit with type of load served, including tungsten filament and inductive-type loads.

C. Modular Single-Pole Relays shall be split-coil, momentary-pulsed type, knockout mounting.

1. Low-Voltage Leads: 5-pin plug connector.

2. Pilot Contacts: Single pole.

3. Rated Capacity: 20A, 125VAC for 120-volt lighting loads, and 20A, 277VAC for 277-volt lighting loads.

4. Endurance: 50,000 cycles at rated capacity.

2.11 EMERGENCY LIGHTING CONTROL DEVICES
A. Emergency Lighting Control Unit – A UL 924 listed device that monitors a circuit providing normal lighting to an area. The unit provides normal dimming and ON/OFF control of emergency lighting along with the normal lighting. Upon normal power failure the emergency lighting circuit will close, forcing the emergency lighting ON until normal power is restored. Features include:

1. 120/277 volts, 50/60 Hz, 20 amp dimming LED driver rating

2. Push to test button

3. Auxiliary contact for remote test or fire alarm system interface B. nLight Product Numbers: nPP16 ER SHUNT.

2.12 NLIGHT ENABLED NETWORK LIGHTING FIXTURES
A. Lighting fixtures specified as nLight enabled shall have an integral nLight network interface and be integrated into the nLight network lighting control system.
637
22-12479 LIGHTING CONTROL SYSTEMS 266100 - 9 of 13
PART 3 - EXECUTION

3.1 PRE-INSTALLATION MEETING
A. A factory authorized manufacturer’s representative shall provide the electrical contractor a functional overview of the lighting control system prior to installation. The contractor shall schedule the pre-installation site visit after receipt of approved submittals to review the following:

1. Confirm the location and mounting of all digital devices, with special attention to placement of occupancy and daylighting sensors.

2. Review the specifications for low voltage control wiring and termination.

3. Discuss the functionality and configuration of all products, including sequences of operation, per design requirements.

4. Discuss requirements for integration with other trades.

3.2 INSTALLATION, CALIBRATION AND PROGRAMMING SERVICES
A. Install all devices and wiring in a professional manner. All line voltage connections shall be tagged to indicate circuit and switched legs.

B. Category 5e network cables shall not have boots installed at the RJ45 plug connectors.

C. Provide and install category 5e cable with RJ-45 connectors interconnecting all control device, bridges and gateways. If pre-terminated cable is not used for room/area wiring, the contractor is responsible for testing each field-terminated cable following installation, and shall supply the lighting controls manufacturer with test results.

Low voltage wiring topology must comply with manufacturer’s specifications. Contractor shall route network wiring as shown in submittal drawings as closely as possible, and shall document final wiring location, routing and topology on as built drawings.

D. Provide and install one ¾” conduit with 2#12 copper THWN/THHN + 1#12 copper ground between nearest constant hot portion of lighting branch circuit and each PS 150 power supply. Connect line voltage to each power supply and connect the Class 2 low voltage wiring between the PS 150 power supply and network bridge.

E. Install the work of this Section in accordance with manufacturer’s printed instructions unless otherwise indicated. Before start up, the contractor shall test all devices to ensure proper communication.

F.Calibrate all sensor time delays and sensitivity to guarantee proper detection of occupants and energy savings.

G. Adjust time delay so that controlled area remains lighted while occupied.

H. Provide written or computer-generated documentation on the configuration of the system including room by room description including:

1. Sensor parameters, time delays, sensitivities, and daylighting setpoints.

2. Sequence of operation, (e.g. manual ON, Auto OFF. etc.) 638
22-12479 LIGHTING CONTROL SYSTEMS 266100 - 10 of 13

3. Load Parameters (e.g. blink warning, etc.)
I. Post start-up tuning – After 30 days from occupancy contractor shall adjust sensor time delays and sensitivities to meet the Owner’s requirements. Provide a detailed report to the Architect / Owner of post start-up activity.

J.Network daylight sensors for automatic dimming within a daylit zone shall be calibrated such that lighting power for the lighting fixtures within that daylit zone shall be reduced by 65% when daylit illuminance is 150% of design illuminance. Design illuminance for specific spaces shall be as recommended by the IESNA Lighting Handbook 8th Edition Chapter 11, Figure 11-1, for Commercial, Institutional, Residential, and Public Assembly Interiors.

K. Program uniform manual dimming and ON-OFF control within each space that has a network daylight sensor:

1. Lighting fixtures located within daylit zones shall be programmed to manually turn ON and OFF with lighting fixtures located outside of the daylit zones (in the same space) with a common ON/OFF button.

2. Lighting fixtures located within daylit zones shall be programmed to manually dim at the same rate as lighting fixtures outside of the daylit zone (in the same space) once lighting fixtures outside of the daylit zone have had lighting power manually reduced by 65%.

L.Program four-scene network dimming manual control stations as follows:

1. ENERGY SAVER (Scene 1): Selection of the “ENERGY SAVER” scene shall uniformly lower the lighting levels of all lighting fixtures within the space to 85-percent of their maximum lighting power demand (emulates demand response at local zone level).

2. A/V (Scene 2): Selection of the “A/V” scene shall turn OFF lighting fixtures in zones with lighting fixtures located in front of a projection screens or video monitors and shall reduce all other zones within the space to 20-percent of maximum light output.

3. DIM-50% (Scene 3): Selection of the “DIM-50%” scene shall uniformly lower the lighting levels of all lighting fixtures within the space to 50-percent of maximum light output.

4. DIM-5% (Scene 4): Selection of the “DIM-5%” scene shall uniformly lower the lighting levels of all lighting fixtures within the space to 5-percent of maximum light output.

5. Dimming manual control station shall include ON/OFF control.

M. Lighting controls shall be connected and programmed to be demand responsive and shall automatically reduce building lighting power demand by 15% in response to a demand response signal per 2019 CA Energy Code section 130.1 (e).

3.3 FACTORY SERVICES
A. Upon completion of the installation, a manufacturer's factory authorized representative shall start up and verify a complete and fully functional system.
639
22-12479 LIGHTING CONTROL SYSTEMS 266100 - 11 of 13
B. Upon completion of the system start up, the factory-authorized technician shall provide the proper training to the owner's personnel on the adjustment and maintenance of the system.

3.4 ACCEPTANCE TESTING AND COMMISSIONING
A. The Contractor shall provide the services of a California State certified lighting controls acceptance test technician (CLCATT) to act as the acceptance testing agent and verify the installation of the lighting control systems.

B. Provide the services of a manufacturer’s factory technician time to assist the CLCATT review the functionality and settings of the lighting control hardware per the requirements in the California State forms.

C. The Contractor shall provide the services of a Commissioning Agent to provide commissioning of the indoor and outdoor lighting systems. The following commission tasks shall be completed in accordance with 2019 California Energy Code, Section 120.8 Building Commissioning:

1. The Commissioning Agent shall obtain the Owner’s Project Requirements.

2. The Commissioning Agent shall compile and update a Basis of Design during the construction of the project.

3. The Commissioning Agent shall complete a commissioning plan including the following information:
a. General project information
b. Commissioning goals
c. Systems to be commissioned
d. Plans to test systems and components, which shall include:
1) An explanation of the original design intent
2) Equipment and systems to be tested, including the extent of the tests 3) Functions to be tested
4) Conditions under which the test shall be performed
5) Measurable criteria for acceptable performance
6) Commissioning team information
7) Commission process activities, schedules and responsibilities

4. The Commissioning Agent shall provide function performance testing.

5. The Commissioning Agent shall provide system documentation and training requirements.

6. The Commissioning Agent shall provide a commissioning report.

3.5 TITLE 24 - PART 6 DOCUMENTATION OF INSTALLATION AND ACCEPTANCE FOR INDOOR AND OUTDOOR

LIGHTING
640
22-12479 LIGHTING CONTROL SYSTEMS 266100 - 12 of 13
A. The Contractor shall prepare and submit the following Certificates of Installation:

1. Indoor Lighting:
a. Certificate of Installation – Validation of Certificate of Compliance (NRCI-LTI-01-E)

2. Outdoor Lighting:
a. Certificate of Installation – Outdoor Lighting (NRCI-LTO-01-E) B. The Contractor shall provide the services of a California state certified lighting controls acceptance test technician (CLCATT) to perform acceptance tests, prepare Certificates of Acceptance and certify that all indoor and outdoor lighting systems comply with the 2019 California Energy Code Section 130.4. The Certificates of Acceptance shall bear the name and certification identification number of the certified lighting compliance acceptance test technician. The certified lighting compliance acceptance test technician shall prepare and submit the following Certificates of Acceptance:

1. Indoor Lighting:
a. Certificate of Acceptance – Lighting Controls (NRCA-LTI-02-A) b. Certificate of Acceptance – Automatic Daylighting (NRCA-LTI-03-A)

2. Outdoor Lighting:
a. Certificate of Acceptance – Outdoor Motion Sensor and Lighting Shut-off Controls (NRCA- LTO-02-A)
C. The Contractor shall properly calibrate all lighting control devices and systems. To verify that the lighting control devices and systems have been properly calibrated the Contractor shall conduct the following tests as outlined in Chapter 13 of the 2019 California Energy Commission Nonresidential Compliance Manual, Article

13.87 Test Procedures for Indoor & Outdoor Lighting,
and make modifications to the control until it passes the test:

1. Indoor Lighting:
a. 13.88 NA7.6.1 Automatic Daylighting Control Acceptance b. 13.89 NA7.6.2.4 and NA7.6.2.5 Automatic Time Switch Acceptance c. 13.90 NA7.6.2.2 and 7.6.2.3 Occupant Sensor Acceptance

2. Outdoor Lighting
a. 13.92 (NA7.8) Outdoor Lighting Shut-off Controls

3.6 ON-SITE ASSISTANCE
A. Within one year of date of Substantial Completion, provide up to three Project site visits, when requested, to adjust light levels, make program changes, and adjust sensors and controls to suit actual conditions.

3.7 PERSONNEL TRAINING
A. Train Owner’s building personnel in procedures for starting-up, testing and operating lighting control system equipment.
641
22-12479 LIGHTING CONTROL SYSTEMS 266100 - 13 of 13
END OF SECTION 266100
642
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 1 of 18
SECTION 269500

ELECTRICAL ACCEPTANCE TESTS
PART 1 - GENERAL

1.1 SUMMARY
A. This Section defines the Electrical Acceptance Tests and checks that shall be made on all electrical equipment and wiring to ensure compliance with all applicable Codes and Standards, and with the requirements of the Contract Documents.

B. All electrical equipment testing and related costs shall be included in the Contractor’s bid.

1.2 GENERAL REQUIREMENTS
A. The Contractor shall test equipment of all kinds installed on this project to determine whether it fulfills the requirements of these Specifications. The Contractor shall furnish all labor necessary to adjust the operation of the apparatus and make the connections for the tests.

After the tests have been completed, the Contractor shall restore all connections, apparatus, etc., to their original condition.

B. The Contractor shall retain the services of a qualified Independent Testing Agency holding a valid current C-10 License to perform certain tests and prepare reports, as enumerated in the following Articles. The Independent Testing Agency shall be a company that specializes in electrical equipment testing and shall be NETA or NICET certified.

C. Contractor shall obtain approval from the architect of proposed independent testing agency(s) before any testing is started.

D. Electrical systems, equipment and materials shall be tested prior to final acceptance of the work.

1.3 INDEPENDENT TESTING AGENCY REQUIREMENTS
A. The Independent Testing Agency shall furnish personnel acceptable to Engineer to conduct testing. Supervising engineer shall have a minimum of five years experience in testing of equipment of the type to be tested on this Project.

B. The Independent Testing Agency shall furnish all labor required for and incidental to testing.

C. The Independent Testing Agency shall provide minor field repairs, adjustments, and wiring modifications at the time of inspection and testing.

D. The Independent Testing Agency shall furnish all necessary test equipment to satisfactorily perform all tests specified herein.

E. The Independent Testing Agency shall check all devices for proper operation - checking for wear, tightness, dirt, etc.
643
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 2 of 18
F. The Independent Testing Agency shall check for conformance to published curves.

G. The Independent Testing Agency shall notify and coordinate with the Owner’s representative at least 3 working days prior to the commencement of any Electrical Acceptance Testing.

Tests shall be witnessed by the Owner’s representative unless such witnessing is waived in writing by the Owner’s Representative.

1.4 CODES AND STANDARDS
A. 2019 California Electrical Code (CEC).

B. National Electrical Manufacturer’s Association (NEMA).

C. Manufacturer’s Instructions and Maintenance Manual applicable to each particular apparatus.

D. OSHA Rules and Regulation.

E. National Electrical Testing Association (NETA) “Acceptance Testing Specifications”.

F. Procedures as directed by Engineer.

1.5 CARE AND PRECAUTIONS
A. Contractor shall be responsible for any damage to equipment or material due to improper test procedures or test apparatus handling, and shall replace or restore to original condition, any damaged equipment or material.

B. Contractor shall furnish and use safety devices such as rubber gloves and blankets, protective screens, barriers, and danger signs to adequately protect and warn all personnel in the vicinity of the tests.

1.6 EQUIPMENT TO BE TESTED BY CONTRACTOR
A. Perform the visual inspections, manual operations and tests on systems and equipment as described in Part 3, "Execution".

B. Engine-Generator Set
C. Substation Primary Switch
D. Medium Voltage (Primary) Cable
E. Substation Transformer
F. Secondary Switchgear
G. Switchboard
H. Molded Case Circuit Breakers Rated Less Than 100A
I. Power Cable
644
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 3 of 18
J. Distribution Transformers
K. Service, Distribution and Motor Control Equipment
L. Disconnect Switches
M. Motors
N. Lighting
O. Title 24 Acceptance Testing
P. Heat Tracing Cables and Mats
Q. Control Cable
R. Fire Alarm System
S. Intercommunications, Clock, and Program System
T. Video Distribution System
U. Special Systems
V. Communication System

1.7 EQUIPMENT TO BE TESTED BY INDEPENDENT TESTING AGENCY A. Circuit Breakers Rated 100A and Greater
B. Grounding System
C. Switchboards and Panels

1.8 SUBMITTALS
A. Submittals for this Section shall be made according to the Conditions of the Contract, Division 01 Specification Sections and Specification Section 260100.

B. Test Reports

1. Provide written test reports, signed and dated, for all tests prior to acceptance of the tested equipment by the Owner.

2. All tests shall be recorded on the following forms:
a. 269500 - 1 MULTIPLE CONDUCTOR CABLE MEGGER TEST,
300V AND LESS
b. 269500 - 2 SINGLE & MULTIPLE CONDUCTOR POWER CABLE
MEGGER TEST, 600V AND LESS

3. Submit certified reports of Independent Tests and Observations indicating and interpreting test results specified in Part 3 of this Section. 645
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 4 of 18
a. The Test Report shall include the following:
1) Description of equipment tested.
2) Description of test procedure.
3) Calibration record for all testing devices used.
4) Test results.
5) Recommendations.
6) Appendix, including all field test reports.
b. Furnish six copies of completed report to the Electrical Engineer no later than ten days after test completion unless requested otherwise by Owner. c. Instrumentation-Traceability: The testing agency shall provide calibration labels for all relays and circuit breakers tested.
d. Labels shall be self-adhesive and placed on covers or frames so as not to obscure nameplate, tap block or time dial. Label shall indicate date tested and firm name.

PART 2 - PRODUCTS

2.1 TESTING EQUIPMENT
A. Furnish suitable electrical instruments including voltmeters, ammeters, wattmeters, tachometers and all other equipment necessary to perform tests specified.

B. Make necessary openings in circuits for testing instruments and place and connect all instruments, equipment and devices necessary for the tests. Upon completion of tests, remove instruments and instrument connections and restore all circuits to permanent condition.

2.2 TESTING COORDINATION
A. Coordinate activities and cooperate with others on the Project to ensure that systems are energized when required, when loads are applied, and that other requirements of this Section of the Specifications are carried out in a timely, coordinated basis.

B. Conduct tests in the presence of the Construction Manager. Notify the Construction Manager seven calendar days or more in advance when any test is to be performed, and do not start tests without the permission of the Construction Manager.

C. Make up no permanent connections until correct phase sequence of all equipment is determined.

PART 3 - EXECUTION

3.1 GENERAL
646
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 5 of 18
A. The Contractor shall provide Acceptance Testing on the entire Electrical System. Certain of this testing shall be performed by an Independent Testing Agency as indicated.

B. Acceptance Testing shall include Visual Inspections, Manual Operations, Electrical Tests, and Functional Testing.

C. Whenever possible, all Visual Inspections, Manual Operations and Electrical Tests shall be made just prior to energizing the equipment or circuits, and shall be coordinated with the field schedule and field conditions.

D. Test reports on megger, dielectric absorption and high potential tests shall include the ambient temperature and relative humidity existing at the time of the tests.

E. Should any piece of apparatus or any material or work fail during any of these Tests, it shall be immediately removed and be replaced by perfect material by this Contractor at his expense and the portion of the work replaced be again tested by the Contractor.

F. Before testing and energizing a system, all necessary precautions shall be taken to ensure the safety of personnel and equipment. All conductors and all electrical equipment shall be properly insulated and enclosed. All enclosures for conductors and equipment shall be properly grounded. Insulation resistance measurements must have been made and approved on all conductors and energized parts of electrical equipment.

1. During actual testing, the Contractor or Independent Testing Agency shall:
a. Ensure that temporary power terminations are connected in such a manner that commercial power may be restored in forty-five minutes upon request. b. Place temporary power cables out of the way in a safe manner that provides no hazard to personnel or equipment in the area.
c. Provide all special connections required.
d. Conduct all tests in presence of the representative except where advised this would not be necessary.

G. The entire installation shall be free from short circuits and improper grounds. Panels and circuits shall be tested for grounds and shorts with mains disconnected from the feeder, branches connected, lamps removed or omitted from the sockets and all wall switches closed. Each individual circuit shall be tested at the panel with the equipment connected for proper operation
H. The following minimum tests are required, but shall not be limited to this list. Tests will be supervised and witnessed by the Construction Manager:

1. Proper phase rotation.

2. Short circuits.

3. Improper grounds.

4. Power and control electrical circuits for circuit continuity and function test.

I. Furnish all personnel, labor, meters, instruments, cable, connections, equipment and apparatus necessary for making all tests.
647
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 6 of 18
J. Check and test all switchboards, transformers, panelboards, feeders, power and control cables, communication system devices and wiring, and all connections to all equipment.

K. After wires and cables are in place and connected to devices and equipment, the system shall be tested for short circuits, improper grounds, and other faults. If fault condition is present, the trouble shall be rectified and the wiring system shall be retested.

L. A voltage test shall be made at each lighting panel, distribution panel and at the last outlet on each circuit. If drop in potential exceeds one percent, correct the condition by locating the ground or high resistance splice or connection and retest.

M. Any wiring device, electrical apparatus, or lighting fixture grounded or shorted on any integral "live" part, shall be removed and the trouble rectified by replacing the defective parts or materials.

N. All final tests shall be witnessed by the Construction Manager and three copies of the verified test results shall be given to the Architect/Engineer and Construction Manager promptly upon completion of a test.

O. Provide assistance to the various equipment manufacturers' field engineers as required in the testing and adjusting of the electrical power and control equipment. Cooperation shall be such that a minimum of time is required for equipment testing.

P. A log shall be maintained for all tests. This log shall be certified before completion of the project, both as to test value and date of test. All major equipment such as the switchboard and panelboards shall be energized initially in the presence of the Construction Manager.

Q. The Owner reserves the right to operate any system or equipment prior to final completion and acceptance of the work. Such preliminary operation shall not be construed as an acceptance of any work. Each piece of equipment and all of the systems shall be adjusted to insure proper functioning and shall be left in first class operating condition.

3.2 VISUAL INSPECTIONS
A. Prior to Manual Operation and Electrical Testing, perform Visual Inspections to verify the following:

1. The equipment is completely and properly installed.

2. The equipment is free from damage and defects.

3. Shipping blocks and restraints have been removed.

4. Electrical terminations have been properly tightened.

5. The equipment has been properly aligned.

6. The equipment has been properly lubricated.

7. The ventilation louvers are open and unobstructed.

8. Voltages and phases have been properly identified.

9. Terminations in control panels have been properly identified. 648
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 7 of 18

10. The equipment is ready to be tested

3.3 MANUAL OPERATION
A. Prior to any Electrical Testing, mechanical devices shall be exercised or rotated manually to verify that they operate properly and freely.

3.4 ELECTRICAL TESTS BY CONTRACTOR
A. Secondary Switchgear

1. Perform a continuity check and 1,000 volt DC megger test on buses, and on main and feeder breakers.

2. Perform a primary current injection test and a 'Ducter' (contact resistance) test on main breakers.

3. Perform a 1,000-volt DC megger test and a turns-ratio test on CT's and PT's.

4. Calibrate the metering.

B. Switchboard

1. The Contractor shall perform each visual and mechanical inspection and electrical test stated in NETA Acceptance Testing Specification, Sections 7.1, 7.6, 7.9, 7.10,

7.11, and 7.14, as appropriate. Certify compliance with test parameters.

2. Switchboard and completed installation shall be inspected for adequate size, bus spacing, bracing, physical damage, proper alignment, anchorage and grounding.

3. Switchboard frame will be inspected for alignment, level, and anchorage.

4. Check tightness of accessible bolted bus joints using calibrated torque wrench per manufacturer’s recommended torque value. All bus bolts will be torqued to their proper value. A mark to be placed on each tightened bolt to ensure completeness.

5. Switchboard interior will be vacuumed and wiped clean.

6. The following tests and checks shall be performed before placing in operation:
a. Check all new bus and cable connections for proper contact pressure and mark each bolt with a red “dot” of paint to indicate it has been checked. b. Check all the new equipment for mechanical adjustment, lubrication, and freedom of operation. Remove all shipping blocks.
c. Operate and test trip units for all new breakers.
d. Test all transfer switches and associated control circuits for correct connection and operation.
e. Test all panel feeders and main breakers.
f. Test ground fault systems by operating push-to-test button. g. Physically test key interlock systems to check for proper functionality. 649
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 8 of 18

7. Using a Megger, measure the insulation resistance of each bus section phase-to- phase and phase-to-ground for one minute each, at minimum test voltage of 1000VDC. Minimum acceptable value for insulation resistance is one (1) megohm.

Refer to manufacturer’s literature for specific testing procedure.

C. Molded Case Circuit Breakers rated less than 100A

1. Circuit breakers will be operated manually several times to ensure smooth operation.

2. Molded case will be inspected for cracks.

3. Rated current will be passed through each phase and millivolt readings taken across contacts.

4. Time current characteristic tests will be performed by passing 300% rated current through each phase and monitoring trip time.

5. Instantaneous pickup current will be determined by finding the current level at which the breaker trips out in less than 2 cycles.

6. Insulation resistance tests will be performed at 1000 Volts DC.

7. Circuit breaker covers will be removed on unsealed units and checked for cracks.

Interphase barriers and arc chutes to be inspected. All bolts and lugs will be tightened. All internal auxiliary devices will be inspected.

8. Contacts, shunts, etc., will be visually inspected for wear and alignment.

9. Inverse trip time, instantaneous pickup current and millivolt drop across contacts, insulation resistance values, as well as deficiencies causing breaker to function outside published limits will be recorded. Times will then be compared with manufacturer’s or NEMA published values.

D. Power Cable

1. The 600-volt insulated wires and cables shall be factory tested prior to shipment in accordance with ICEA Standards for the insulation specified.

2. Perform a continuity check and a 1,000 volt DC megger test on 600 volt power cables No. 6 AWG and larger.
a. The megger test shall be performed between each pair of conductors and from each conductor to ground.
b. The megger test shall be performed for 15 seconds or until the insulation resistance value stabilizes.
c. The insulation resistance between conductors and from each conductor to ground shall be 100 megohms minimum in one minute or less. In addition, the lowest insulation resistance value shall not differ from the highest value by more than 20 percent.

3. Phase conductors, if shorted, grounded or at fault shall be removed, shall be replaced and the wiring system shall be retested.

E. Service, Distribution and Motor Control Equipment

1. Megger tests shall be performed at a DC voltage of 1,000 volts for 600 volt rated equipment, and at 500 volts for 120-300 volt rated equipment. 650
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 9 of 18

2. Perform a 1,000-volt megger test on buses, motor starters and disconnect switches.

This test may be combined with the feeder cable megger test by testing the devices and terminated cables together.

3. Perform a continuity check on motor control circuits and control panel internal wiring.

4. Perform an operational test on the controls.

5. Perform a continuity check and a 1,000-volt DC megger test on 3 phase distribution and isolation transformers.

F. Disconnect Switches

1. Check for cleanliness of contacts, operation, etc.

2. Lubricate contacts and mechanical devices.

3. Check fuse-clip tightness.

4. Perform a 1,000-volt megger test on disconnect switches rated for 600V and at 500 volts for disconnect switches rated for 240V.

G. Motors

1. Perform a 1,000-volt megger test on 460 volt, 3 phase motors, and a 500 volt megger test on 200-230 volt, 3 phase motors.

2. “Bump” motors to verify proper direction of rotation.

3. Run motors and check for vibration and overheating.

H. Lighting

1. Upon completion of installation of lighting fixtures and controls, and after building circuitry has been energized, apply electrical energy to demonstrate capability and compliance with requirements. The Contractor shall replace at his expense all noisy ballasts, broken or cracked lenses or other defective items. Where possible, correct malfunctioning units at site, then re-test to demonstrate compliance; otherwise, remove and replace with new units, and proceed with re-testing.

2. At the time of substantial completion, replace lamps in interior lighting fixtures, which are observed to be noticeably dimmed after Contractor’s use and testing, as judged by Architect or Electrical Engineer.

3. Replace defective and burned out fluorescent or HID lamps for a period of one-year following the time of substantial completion

4. Give advance notice of dates and times for field tests.

5. Provide instruments to make and record test results.

6. Tests and Observations
a. Verify normal operation of lighting units after installing fixtures and energizing circuits with normal power source.
b. Check for excessively noisy ballasts.
651
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 10 of 18
c. Interrupt electrical energy to demonstrate proper operation of emergency lighting installation. Include the following information in tests of emergency lighting equipment:
1) Duration of supply
2) Low battery voltage shutdown.
3) Normal transfer to battery source and retransfer to normal. 4) Low supply voltage transfer.
5) Report results of tests in wiring.

I. Title 24 Acceptance Testing

1. Perform tests as outlined in Part 3 of Specification Section 265113.

J. Heat Tracing Cables and Mats

1. Perform a continuity check, 500-volt DC megger test and an operational test on heat tracing circuits prior to insulation of the pipe or tank. Verify proper current draw and heating of the heat tracing.

2. Perform an operational test on the alarms as applicable K. Control Cable

1. Perform a continuity check on control and instrumentation wiring.

L. Fire Sprinkler Monitoring System

1. Perform testing in accordance with NFPA 72-2016.

M. Intercommunications, Clock, and Program System

1. Manufacturer's Field Service: Provide services of a factory-authorized service representative to supervise the field assembly and connection of components, perform the initial system programming, and oversee the pre-testing, testing and adjustment of the system.

2. Programming: Fully brief the Owner on programming options available for the system. Record his programming decisions and set up the initial programming of the system. Set system so signal devices operate on required schedules and are activated for durations selected by the Owner. Program relay output circuits to suit Owner’s operating schedule for the equipment controlled. Provide the Owner with a written record of the decisions, implementation methodology, and final results.

3. Test Procedure: Conform to the following:
a. Schedule tests a minimum of 7 days in advance of performance of tests. b. Report: Submit a written record of inspection and test results. c. Operational Test: Perform operational system test to verify conformance of system to these Specifications. Perform tests that include originating station-to-station, all-call, and page messages at each intercommunication station. Verify proper routing and volume levels and freedom from noise and distortion. Test each available message path from each station on the system. Include operation of all modes of clock
652
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 11 of 18
correction and all programming and manually programmed signal and relay operating functions.
d. Frequency Response Test: Determine frequency response of 2 transmission paths, including all-call and paging by transmitting and recording audio tones. The minimum acceptable performance is within 3 dB from 150 to 2500 Hz.
e. Signal-to-Noise Ratio Test: Measure the ratio of signal to noise of the complete system at normal gain settings, using the following procedure:
1) Disconnect a speaker microphone and replace it in the circuit with a signal generator using a 1000-Hz signal. Measure the ratio of signal to noise.
2) Repeat the test for 4 speaker microphones and for each separately controlled zone of paging loudspeakers.
3) The minimum acceptable ratio is 35 dB.
f. Distortion Test: Measure distortion at normal gain settings and rated power.

Feed signals at frequencies of 150, 200, 400, 1000, and 2500 Hz into each paging and all-call amplifier, and a minimum of 2 selected intercommunication amplifiers, and for each frequency, measure the distortion in the paging and all-call amplifier outputs. The maximum acceptable distortion at any frequency is 5 percent total harmonics. g. Acoustic Coverage Test: Feed pink noise into the system using octaves centered at 500 and 4000 Hz. Use a sound-level meter with octave band filters to measure the level at 3 locations in each paging zone. The maximum permissible variation in level is plus or minus 3 dB, and the levels between adjacent zones must not vary more than plus or minus 5 dB. h. Power Output Test: Measure the electrical power output of each paging amplifier at normal gain setting at 150, 1000, and 2500 Hz. The maximum variation in power output at these frequencies must not exceed plus or minus 3 dB.
i. Signal Ground Test: Measure and report ground resistance at the system signal ground. Conform to the testing requirements of Division 26 Section "Grounding."

4. Retesting: Rectify deficiencies indicated by tests and completely retest work affected by such deficiencies at Contractor's expense. Verify by the system test that the total system meets the Specifications and complies with applicable standards. Provide a written record of all retest results.

5. Inspection: Verify that units and controls are properly labeled and interconnecting wires and terminals are identified. Provide a list of final tap settings of paging speaker line matching transformers.

N. Special Systems

1. Security systems, sound reinforcement systems, and other special systems shall be tested in accordance with test plans submitted by their manufacturers and approved by the Owner. These test plans shall verify compliance with Specifications and proper operation including all inputs, outputs and accessories under all modes of operation.
653
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 12 of 18
O. Communication System

1. Refer to Division 27 Sections of these Specifications for testing.

3.5 INDEPENDENT AGENCY TESTING
A. Circuit Breakers rated 100A or greater

1. All circuit breakers, 100 amps or more, shall be tested by an independent testing agency in accordance with NETA specifications and a report submitted to the architect. Any circuit breaker that does not pass the test shall be replaced.

2. Circuit breakers will be operated manually several times to ensure smooth operation.

3. Molded case will be inspected for cracks.

4. Rated current will be passed through each phase and millivolt readings taken across contacts.

5. Time current characteristic tests will be performed by passing 300% rated current through each phase and monitoring trip time.

6. Instantaneous pickup current will be determined by finding the current level at which the breaker trips out in less than 2 cycles.

7. Insulation resistance tests will be performed at 1000 Volts DC.

8. Circuit breaker covers will be removed on unsealed units and checked for cracks.

Interphase barriers and arc chutes to be inspected. All bolts and lugs will be tightened. All internal auxiliary devices will be inspected.

9. Contacts, shunts, etc., will be visually inspected for wear and alignment.

10. Inverse trip time, instantaneous pickup current and millivolt drop across contacts, insulation resistance values, as well as deficiencies causing breaker to function outside published limits will be recorded. Times will then be compared with manufacturer’s or NEMA published values.

11. The testing agency shall provide calibration labels for all relays and circuit breakers tested. Labels shall be self-adhesive and placed on covers or frames so as not to obscure nameplate, tap block or time dial. Label shall indicate date tested and firm name.

B. Grounding System

1. Test shall be performed for every new SEPARATELLY DERIVED AC SYSTEM.

2. Ground tests shall meet the requirements of the California Electrical Code and comply with UL 467. The grounding electrode system at the main electrical service equipment shall be tested by an Independent Testing Agency in accordance with the three point fall of potential method as specified in IEEE Standard 81-1983.

Maximum ground resistance shall be 5 OHMS. A copy of the test report shall be submitted to the architect and engineer of record.

3. Maximum grounding to resistance values are as follows:
a. Equipment Rated 500 kVA and Less: 5 ohms.
654
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 13 of 18
b. Equipment Rated 500 to 1000 kVA: 5 ohms.
c. Equipment Rated More than 1000 kVA: 3 ohms.

4. Tests: Subject the completed grounding system to a megger test at each location where a maximum ground-resistance level is specified, at service disconnect enclosure grounding terminal, and at ground test wells. Measure ground resistance not less than 2 full days after the last trace of precipitation, and without the soil being moistened by any means other than natural drainage or seepage and without chemical treatment or other artificial means of reducing natural ground resistance.

Perform tests by the 2-point method according to IEEE 81.

5. The test agency shall remove the test link between the ground and neutral, and test the neutral for any parallel and/or superfluous ground paths. If any are found, a report should be given to the Engineer. No grounds are to be removed unless authorized in writing.

6. Ground electrode resistance shall be taken using a Biddle ground resistance meter and readings given to the report.

7. All ground connections in switchboard as well as that to cold water pipes shall be check for tightness and adequacy.

8. Measure the resistance to ground of each ground rod [in a ground mat] before connection to the other ground rods. The resistance shall not exceed 10 ohms.

9. Measure the resistance to ground of the total ground system with all connections completed. The resistance shall not exceed 2 ohms for primary services or 5 ohms for secondary services.

10. Tests of the resistance to ground shall be made using either the three point method or the fall-of-potential method.

11. Perform a continuity check from equipment ground bus bars and ground lugs to the ground system.

12. Ground rods for manholes and light poles need not be tested.

13. Excessive Ground Resistance: Where resistance to ground exceeds specified values, notify Owner promptly and include recommendations to reduce ground resistance and to accomplish recommended work.

14. Report: Prepare test reports, certified by the testing organization, of ground resistance at each test location. Include observations of weather and other phenomena that may affect test results. Describe measures taken to improve test results.

C. Switchboards and Panels

1. The Independent Testing Agency shall perform each visual and mechanical inspection and electrical test stated in NETA Acceptance Testing Specification, Sections 7.1, 7.6, 7.9, 7.10, 7.11, and 7.14, as appropriate. Certify compliance with test parameters.

2. After Substantial Completion, but not more than 2 months after Final Acceptance, The Independent Testing Agency shall perform an infrared scan of each switchboard and panel.
655
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 14 of 18
a. Remove fronts to make joints and connections accessible to a portable scanner.
b. Use an approved infrared-scanning device designed to measure temperature or detect significant deviations from normal values. c. Provide calibration record for device used.
d. Prepare a certified report identifying switchboards and panels checked and describing results of infrared scanning. Include notation of deficiencies detected, remedial action taken and observations after remedial action.

3.6 FUNCTIONAL TESTING
A. All automatic and manual functions shall be checked for proper operation.

B. All indicating circuits, lights and alarms shall be tested for correct operation. Burned out indicators shall be re-lamped.

C. Upon completion of the Work, place the entire installation in operation, test for proper function, and show systems and equipment to be free of defects.

END OF SECTION 269500
656
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 15 of 18
FORM 269500 – 1
MULTIPLE CONDUCTOR CABLE MEGGER TEST, 300 VOLTS & LESS

WIRING - SIGNAL & COMMUNICATION CABLE
Testing shall be performed before connecting the cables to the terminals at either end. Continuity of each conductor shall be checked at this time. Each conductor shall be checked with a 500 volt megger to ground, with all other conductors in the cable and shield, grounded. The minimum acceptable megger resistance shall be 50 megohms for each conductor to ground.

PROJECT NAME _____________________________________________________________________

FEEDER NUMBER LOCATION

CABLE SIZE CABLE LENGTH
NO. OF

CONDUCTORS INSULATION TYPE

MANUFACTURER LINE VOLTAGE

TEMPERATURE HUMIDITY

MEGGER TYPE SERIAL NUMBER

TEST VOLTAGE MULTIPLIER

REMARKS

MEGOHMS CONTINUITY MEGOHMS CONTINUITYCONDUCTOR
NO.

C/C C/S PASS FAIL

CONDUCTOR
NO.

C/C C/S PASS FAIL
657
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 16 of 18

TEST PERFORMED BY
Signature Date

TEST WITNESSED BY
Signature Date
658
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 17 of 18
FORM 269500 – 2
SINGLE & MULTIPLE CONDUCTOR POWER CABLE MEGGER TEST, 600 VOLTS & LESS WIRING – FEEDER CIRCUITS
Testing shall be performed before connecting the cables to the terminals at either end. Continuity of each conductor shall be checked at this time. Each conductor shall be checked with a 500 volt megger to ground, with all other conductors (including shield) in the conduit or cable grounded. The minimum acceptable megger resistance shall be 50 megohms for each conductor to ground.

PROJECT NAME _____________________________________________________________________

FEEDER NUMBER LOCATION

CABLE SIZE CABLE LENGTH
NO. OF

CONDUCTORS INSULATION TYPE

MANUFACTURER LINE VOLTAGE

TEMPERATURE HUMIDITY

MEGGER TYPE SERIAL NUMBER

TEST VOLTAGE MULTIPLIER

REMARKS
Cable No

MEGOHMS
Phase A

MEGOHMS
Phase B

MEGOHMS
Phase C
659
15-0000 ELECTRICAL ACCEPTANCE TESTS 269500 - 18 of 18

TEST PERFORMED BY
Signature Date

TEST WITNESSED BY
Signature Date
660

22-12479 TELECOMMUNICATIONS SYSTEM 272000 - 1 of 5
SECTION 272000

TELECOMMUNICATIONS SYSTEMS
PART 1 - GENERAL

1.1 SCOPE
A. Furnish and install a complete network telecommu nications cabling system including Intermediate Distribution Frames (IDF) (EXISTING), patch panels, outlet boxes, conduits and raceways, jack modules for terminating both ends of each cable, and coverplates.

B. The Contractor shall provide termination, testin g and certification of each cable.

C. The furnishing of network servers and switches i s specifically excluded from this section.

PART 2 - PRODUCTS

2.1 TELECOMMUNICATION BACKBONE CABLING
A. OSP Rated Copper Cable (Voice Backbone)

1. Materials – 24-gauge, twisted pair, solid conduc tor, black polyethylene sheath, shielded of corrugated aluminum, 25-pair.

2. Manufacturer - Essex (SEALPIC-F, Type REA PE39) or equal.

2.2 TELECOMMUNICATION HORIZONTAL CABLING
A. Horizontal Data Cable - For Workstation Outlets

1. Materials – 23 AWG solid copper UTP, 4-pair, CMP rated, premium Category 6 cable. Color: Blue.

2. Manufacturer – Berk-Tek

3. Model: 10163780; Description: type LANmark-2000 series.

B. Horizontal Data Cable – For Wireless Access Poin ts

1. Materials – 23 AWG solid copper UTP, 4-pair, CMP rated, 10-Gigabit Ethernet Category 6A cable. Color: White.

2. Manufacturer – Berk-Tek

3. Model: 11082058; Description: type LANmark-XTP s eries.

C. J Hooks

1. J hook cable supports shall provide a bearing su rface of sufficient width to comply with required bend radii of high-performance cables; cULus Listed. J hook cable supports shall have flared edges to prev ent damage while installing cables. J hook cable supports shall be 1 5/16” mini mum and have a cable 661

22-12479 TELECOMMUNICATIONS SYSTEM 272000 - 2 of 5
retainer strap to provide containment of cables wit hin the hanger. The cable retainer strap shall be removable and reusable and be suitable for use in air handling spaces. J hook cable supports shall have an electro-galvanized or G60 finish and shall be rated for indoor use in non-corrosive environments.

2. Manufacturer – Erico (Caddy Cablecat Series Non- continuous Support Cable System).

2.3 TELECOMMUNICATION HORIZONTAL CABLE TERMINATIONS
A. Data Outlets

1. Station Jack Modules – Materials – 8-position RJ 45, Category 6 rated jack modules. Color: Blue. Manufacturer – Panduit (P/N C J6X88TGBU). Quantity – Three (3) to six (6) as indicated by symbol subscript.

2. Outlet Box and Faceplate - Materials - 4 or 6-po rt, single-gang angled faceplate shall be mounted to a two-gang outlet box fitted wi th a single-gang reducer.

Blanks shall be installed in each unused port. Pand uit (Mini-com Series 4 or 6 module).

B. Wireless Access Points

1. Wireless Access Point Connectors – Materials – 8 -position RJ45, Category 6A rated plug connector module. Color: Clear. Manufacturer – Panduit (P/N SP6X88- C). Quantity – One at location of wireless access point.

2.4 LABELS
A. Materials: Vinyl plastic type that meet UL 969 requirements, preprinted or laser printed type, and easily distinguishable.

B. Manufacturers – Panduit, W.H. Brady, Ideal.

PART 3 - EXECUTION

3.1 INSTALLATION:

A. The Contractor shall install all cables, support s, racks, frames, backboards, blocks, cable management, connectors, manhole cable rack hardware , and all appropriate termination and mounting hardware.

B. The Contractor shall utilize conduits for the pl acement of voice and data backbone cables.

C. The Contractor shall utilize conduits and cable trays for the placement of horizontal voice and data cables. Cables which exit cable trays shal l be supported by J-hooks that are attached to the structure independently from ceiling or lighting fixture supports. 662

22-12479 TELECOMMUNICATIONS SYSTEM 272000 - 3 of 5
D. Where penetrations through fire rated walls, aco ustical or other walls are made for cable pass-thru, such penetrations shall be sealed by the Contractor in compliance with code requirements.

3.2 BONDING AND GROUNDING
A. The Contractor shall provide ground continuity b y properly bonding all appropriate cabling, closures, cabinets, service boxes, conduit , cable trays, and framework. All grounds shall consist of #6 AWG stranded copper wir e and shall be attached to an approved building ground, which is bonded to the ma in electrical ground. Grounding shall be in accordance with J-STD-607-A, NEC, NFPA and all local codes and practices.

3.3 IDENTIFICATION & LABELING
A. The Contractor shall obtain the room numbers tha t will appear on door signage prior to assigning origin and destination identification for labels.

1. Backbone cables shall be labeled at each endpoin t and at all pull boxes, access points or junction boxes. Labels shall indicate ori gination and destination identification, sheath identification, and strand or pair count.

2. Horizontal cables shall be labeled at each endpo int. Labels shall indicate origination and destination identification.

3. All label printing will be machine generated by system software using indelible ink ribbons or cartridges. Self-laminating labels will be used on cable jackets, appropriately sized to the OD of the cable, and pla ced within view at the termination point on each end

3.4 ACCEPTANCE TESTING AND CERTIFICATION
A. All distribution cables shall meet or exceed all performance specifications designated by ANSI/EIA/TIA-568-B.1, and IEEE for telephone and da ta communications.

B. No later than five days after testing, Contracto r shall furnish the Owner with a documentation binder and electronic disks of all te st results from OTDR and power meter test equipment. Electronic copies of test results must be presented in format acceptable to the Owner (runtime software application included if necessary). The content requirements for these forms are described in the following sections.

C. Copper Cables: Testing of all copper wiring shal l be performed prior to system cut-over. 100 percent of the OSP and horizontal wiring pairs shall be tested for opens, shorts, polarity reversals, transposition and presence of A C voltage. Test shall include length, mutual capacitance, characteristic impedance, atten uation, and near-end and far end cross-talk. The Contractor, at no charge shall brin g any pairs not meeting the requirements of the standard into compliance with t he standards and specifications.

Complete, end to end test results must be submitted to the Owner. Test results for each of the above tests and associated cable lengths sha ll be generated by an automated testing device. Test results must be permanently r ecorded and presented for review in both hardcopy and in a computer-readable format.
663

22-12479 TELECOMMUNICATIONS SYSTEM 272000 - 4 of 5
D. Fiber Optic Cables - No later than five days aft er testing, Contractor shall furnish the Owner with a documentation binder and electronic di sks of all test results from OTDR and power meter test equipment. Electronic copies of test results must be presented in a readable format (runtime software application inclu ded in necessary). The content requirements for these forms are described in the following sections.

1. OTDR Test Results
a. Contractor shall furnish on disc with applicatio n software, electronic strip charts and/or tracer recordings on each and every f iber strand in each and every cable in one direction at both 850 and 13 00 nanometer wavelengths for multimode fiber, 1310 and 1550 for singlemode, with the following information:
1) Date of test
2) Name of test personnel
3) Test wavelength
4) Pulse duration(s) and scale range(s)
5) Index of refraction
6) Fiber cable type and part number
7) Fiber tube and/or fiber strand number
8) Direction of test
9) Overall distance in meters
10) Attenuation in dB or dBm

2. Power Meter Test Results
a. Contractor shall furnish attenuation assessments for both 850 and 1300 nanometer wavelengths for multimode fiber and 1310 and 1550 for singlemode on each and every fiber in each and ever y cable, in both directions with the following information:
1) Date of test
2) Name of test personnel
3) Fiber cable type and part number
4) Fiber number
5) TX wavelength
6) TX location
7) RX location
8) TX model and serial number
9) RX model and serial number
10) Attenuation dB or dBm

3. Contractor may be required to perform additional testing as required by Owner to ensure compliance with mated pair connection loss, splice loss and overall link loss. Any cables failing to meet above indicated s tandards must be removed and replaced, at no cost to the Owner, with cables, which prove, in testing, to meet the standards. The installation will not be accepted u ntil testing has reported that all pairs meet the appropriate standards.
664

22-12479 TELECOMMUNICATIONS SYSTEM 272000 - 5 of 5

3.5 PROJECT RECORD DOCUMENTATION
A. The Contractor shall provide a database of cable records, both hard copy and on floppy disk, using Owner approved format (Excel spreadshee t or otherwise specified) for use by the Owner for cable and facilities management. The cable records format must include, at a minimum, the following information about each cable:

1. Distribution Cable Pair Assignments.

2. Test Results.

B. Three (3) sets of reproducible as-built floor pl ans plus vertical rack elevations and wall mounted termination field details in digital format (AutoCAD v.14) showing all installed cables, pair and strand assignments, routing, termi nal and outlet locations, patch panels and labeling conventions.

C. These documents shall be delivered to the Owner no more than 20 working days after completion and acceptance of the Contractor’s work.

END OF SECTION 272000

665
666

22-12479 – Ph 2 FIRE SPRINKLER MONITORING SYSTEM 283100 - 1 of 10

SECTION 283100

FIRE ALARM / EMERGENCY VOICE ALARM COMMUNICATION SYSTEM PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections shall form a part of this Section, with the same force and effect as though repeated here.

1.2 DESCRIPTION:

A. This section of the specifications includes the furnishing, ins tallation, connection and programming of new microprocessor controlled, networked addressable reporting emergency voice alarm communication system fire alarm equipment to form a complete coordinated system ready for operation. It shall include, but not be limited to an emergency voice alarm communication system fire alarm panel, voice amplification power supplies , a voice alarm microphone, alarm initiating devices, alarm notification appliances, auxiliary monitoring and control devices.

B. This Section includes the furnishing of all labor, equipment, materials, and performance of all operations associated with the instal lation of the Fire Alarm / Emergency Voice Alarm Communication System as required by the drawings and specified herein.

1.3 SCOPE:

A. The Contractor shall furnish and install booster power panels , initiation devices and circuits, notification appliances and circuits, control relays, monitor modules and supervisory devices , as required to accomplish this intent whether or not specifically shown or specified.

B. The work specified herein shall be coordinated with the related work as specified elsewhere under the project specifications.

1.4 SUBMITTALS
A. Submittals for this Section shall be made according to the Conditions of the Contract, Division 01 Specification Sections and Specification Section 260100.

B. General:

1. Five copies of all submittals shall be submitted to the Archit ect/Engineer for review.
667

22-12479 – Ph 2 FIRE SPRINKLER MONITORING SYSTEM 283100 - 2 of 10

2. For equipment other than that specified, the c ontractor shall supply proof that such substitute equipment equals or exceeds the features, functions, performance, and quality of the specified equipment.

C. Shop Drawings:

1. Sufficient inf ormation, clearly presented, shall be included to determine compliance with drawings and specifications.

2. Include manufacturer's name(s), model numbers, ratings, power requirements, equipment layout, device arrangement, complete wiring point-to-point diagrams, and conduit layouts.

3. Show remote annunciator(s) layout, configurations, and terminations.

4. Shop drawings shall show valid Contractor’s C -10 license, wet-signed by C-10 license holder.

D. Manuals:

1. Submit simultaneously with the shop drawings, complete opera ting and maintenance manual listing the manufacturer's name(s) includin g technical data sheets.

2. Wiring diagrams shall indicate internal wiring for each item of equipment and the interconnections between the items of equipment.

3. Provide a clear and concise d escription of operation that gives, in detail, the information required to properly operate the equipment and system.

E. Certifications:

1. Together with the shop drawing submittal, submit a certification from the major equipment manufacturer indicating that the proposed supervisor of installation and the proposed performer of cont ract maintenance is an authorized representative of the major equipment manufacturer. Include names and addresses in the certification.

1.5 WARRANTY
A. All work performed and all material and equipment furnished under this Contract shall be free from defects and shall remain so for a period of at least one (1) year from the date of acceptance. The full cost of maintenance, labor and materials required to correct any defect during this one -year period shall be included in the submittal bid and is part of this Contract.

1.6 APPLICABLE STANDARDS:

A. The specifications and standards listed below form a part of this specification.

The system shall fully comply with these standards.

1. 2019 NFPA 72 National Fire Alarm Code
668

22-12479 – Ph 2 FIRE SPRINKLER MONITORING SYSTEM 283100 - 3 of 10

2. 2019 California Electrical Code (CEC)

3. 2019 California Fire Code (CFC)

4. 2019 California Mechanical Code (CMC)

5. 2019 California Building Code (CBC)

6. Underwriters Laboratories Inc. (UL) - USA:

7. California State Fire Marshal

8. All requirements of the Authority Having Jurisdiction (AHJ).

1.7 APPROVALS:

A. The system shall have proper listing and/or approval from the following nationally recognized agencies:

1. UL Underwriters Laboratories Inc.

2. CSFM California State Fire Marshal
PART 2 - PRODUCTS

2.1 MANUFACTURERS:

A. The fire spri nkler monitoring system design is based on th e use of microprocessor-based addressable and fire alarm control equipment, notification appliances equipment manufactured by Potter.

2.2 FIRE SPRINKLER MONTORING PANEL (FSMP):

A. The Fire Sprinkler Monitoring Panel shall be the Potter PFC-6006.

B. Digital Alarm Communicator Transmitter (DACT)

1. Listed and labeled under UL 864 and NFPA 72.

2. Functional Performance: Unit receives an alarm, supervisory, or trouble signal from the FAC P panel, and automatically captures one or two telephone lines and dials a preset number for a remote central station.

When contact is made with the central station(s), the signal is transmitted.

The unit supervises up to two telephone lines. Where supe rvising two lines, if service on either line is interrupted for longer than 45 seconds, the unit initiates a local trouble signal and transmits a signal indicating loss of telephone line to the remote alarm receiving station over the remaining line. When telephone service is restored, unit automa tically reports that event to the central station. If service is lost on both telephone lines, the local trouble signal is initiated.
669

22-12479 – Ph 2 FIRE SPRINKLER MONITORING SYSTEM 283100 - 4 of 10

3. The DACT shall be Carrier Information Code (CIC) compliant and shall transmit a ll popular transmission formats and shall have a sixteen digit telephone number field. The Contractor shall coordinate with the District’s UL Listed central monitoring station and ensure compatible transmission format.

4. Self Test: Conducted automatically e very 24 hours with report transmitted to central station.

C. Batteries:

1. Shall be maintenance free, VRLA AGM lead-acid type.

2. Batteries shall have sufficient capacity to power the fire alarm system for not less than twenty -four hours plus 15 minutes of alarm up on a normal AC power failure.

3. The batterie s are to be completely maintenance free. No liquids are required. Fluid level checks refilling, spills and leakage shall not be required.

2.3 INITIATION DEVICES
A. Waterflow Switches (System Sensor WFD Series)

1. Waterflow switches shall be integral, mechanical, non -coded, non - accumulative retard type.

2. Waterflow switches shall have an alarm transmission delay time that is conveniently adjustable from 0 to 60 seconds.

3. Waterflow switches shall be located a minimum of one (1) foot from a fitting that changes the directi on of the flow and a minimum of thr ee (3) feet from a valve.

4. Each waterflow switch shall be individually monitored by an addressable monitor module that is connected to the initiation device circuit of the fire alarm system.

B. Sprinkler and Standpipe Valve Supervisory Switches:

1. Each sprinkler system water supply control valve riser or zone control valve, and each standpipe system riser control valve shall be equipped with a supervisory switch. Standpipe hose valves, and test and drain valves shall not be equipped with supervisory switches.

2. Each Post Indicator Valve (PIV) shall be equipped with a supervisory switch.

3. Mount switch so as not to interfere with the normal operation of the valve and adjust to operate within two revolutions toward the closed position of the valve control, or when the s tem has moved no more than one -fifth of the distance from its normal position.
670

22-12479 – Ph 2 FIRE SPRINKLER MONITORING SYSTEM 283100 - 5 of 10

4. The mechanism shall be contained in a weatherproof aluminum housing, that shall provide a 3/4 -inch tapped conduit entrance and incorporate the necessary facilities for attachment to the valves.

5. Switch housing to be finished in red baked enamel.

6. The entire installed assembly shall be tamper proof and arranged to cause a switch operation if the housing cover is removed, or if the unit is removed from its mounting.

7. Each valve superv isory switch shall be individually monitored by an addressable monitor module that is connected to initiation device circuit of the fire alarm system.

2.4 ADDRESSABLE MODULES, CONTROL RELAYS, AND AUXILIARY DEVICES A. Addressable Control Module

1. Addressable Control Modules shall be provided to supervise and control the operation of one conventional Notification Appliance Circuit (NAC) of compatible, 24 VDC powered, polarized Audio/Visual appliances or audio speakers.

2. The Control Module shall be mounted in a standard 4-inch square, 2-1/8" deep electrical box.

3. The NAC shall wire in a Class B (Style Y) or Class A (Style Z) fashion.

Each control module shall support up to 1 Amp of Inductive or 2 Amps of Resistive Audible/Visual signals.

4. Audible/Visual power shall be provided by a separate notification appliance circuit from the main Fire Alarm Control Panel or from a fire alarm expander panel.

5. The Control Module shall provide address -setting means using decimal switches and shall also s tore an internal identifying code that the Control Panel shall use to identify the type of device. An LED shall be provided that shall flash under normal conditions, indicating that the Control Module is operational and is in regular communication with the control panel.

6. A magnetic test switch shall be provided to test the module without opening or shorting its NAC circuit wiring.

PART 3 - EXECUTION

3.1 EQUIPMENT INSTALLATION
A. Installation shall be in accordance with the NEC, NFPA 72, local and state codes, as shown on t he drawings, and as recommended by the equipment manufacturer.
671

22-12479 – Ph 2 FIRE SPRINKLER MONITORING SYSTEM 283100 - 6 of 10

B. All fire detection and alarm system devices, control panels and remote annunciators shall be flush mounted when located in finished areas and may be surface mounted when located in unfinished areas.

3.2 WIRING INSTALLATION
A. Fire Alarm System initiation device circuits and notification appliance circuits shall be installed in conduit. The minimum conduit size shall be ¾”.

B. All conduit, junction boxes, conduit supports and hangers shall be concealed in finished areas and may be exposed in unfinished areas. Smoke detectors shall not be installed prior to the system programming and test period. If construction is ongoing during this period, measures shall be taken to protect smoke detectors from contamination and physical damage.

C. Power-Limited Circuits: NFPA 70, Types FPL, FPLR, or FPLP, as recommended by manufacturer.

D. The Fire Sprinkler Monitoring Panel shall be connected to a separate dedicated 120V, 20A branch circuit with a dedicated neutral conductor and an equipment grounding conductor. Provide a circuit breaker lock -on devices on each circuit breaker supplying fire alarm system equipment and provide a red label that reads: "FIRE ALARM / ECS” adjacent to the circuit breaker.

E. Fire Sprinkler Monitoring Panel Primary Power wiring shall be 12 AWG.

F. Where the new fire alarm control panel is tied to an existing fire alarm control panel, the Contractor shall provide, install and connect all wiring, addressable control relays and addressable monitor modules a t both the new and existing control panels and program to allow each fire alarm panel to accept and respond to alarm, trouble and supe rvisory initiation signals from the other fire alarm control panel.

3.3 GROUNDING
A. Ground cable shields and equipment according to system manufacturer's written instructions to eliminate shock hazard and to minimize, to the greatest extent possible, ground loop s, common -mode returns, noise pickup, cross talk, and other impairments.

B. Signal Ground Terminal: Locate at main equipment rack or cabinet. Isolate from power system and equipment grounding.

C. The Fire Alarm Panel cabinet shall be grounded with an equipment grounding conductor that is run with the primary power wiring. Cabinet door s shall be bonded to cabinets with braided grounding straps of sufficient length to allow the cabinet door to fully open.
672

22-12479 – Ph 2 FIRE SPRINKLER MONITORING SYSTEM 283100 - 7 of 10

3.4 PROGRAMMING
A. The Contractor shall provide all programming of the Fire Sprinkler Monitoring System to result in a complete and functional Fire Sprinkler Monitoring System in accordance with all applicable codes and standards, and as specified herein.

B. Zone Programming:

1. The Contractor shall provide zone programming for the Fire Alarm System as follows:
a. Each building shall be programmed as a separate zone. b. Each floor of a multi-story building shall be programmed as a separate zone.
c. Each section of a floor in a building that is separated by area separation walls or by horizontal exits shall be prog rammed as a separate zone.
d. Additional zones shall be programmed where deemed necessary by the authority having jurisdiction.

2. Zone programming for the Fire Alarm System shall match the zone map (refer to Article titled, IDENTIFICATION AND DOCUMENTATION , for zone map requirements.)
C. LCD Annunciation

1. The Contractor shall program the LCD annunciator a t the Fire Alarm Control Panel and remote LCD annu nciators to annunicate the following information:
a. The zone that is in alarm.
b. The type of alarm initiating device:
1) Smoke Detector.
2) Other.
c. The location of the device that is in alarm (refer to Article titled, IDENTIFICATION AND DOCUMENTATION , for device map
location requirements.)
D. Controls

1. The Contractor shall utilize addressable control relays and auxiliary relays and shall program the fire alarm system control panel to cause the closure of fire/smoke dampers and provide a signal for HVAC unit s to shut down.

E. Remote Monitoring Station

1. Contractor shall coordinate with the Remote Monitoring Station and program the system t o report the number of points purchased by the Owner. Prior to the start of programming, Co ntractor shall verify how 673

22-12479 – Ph 2 FIRE SPRINKLER MONITORING SYSTEM 283100 - 8 of 10

many point signals, above and beyond minimum code requirements, shall be transmitted to the monitoring station with Owner.

2. Where the new fire alarm control panel is tied to an existing fire alarm control panel, the Contractor shall program the existing fire alarm panel to accept and respond to alarm and trouble initiation signals from the new fire alarm control panel.

3.5 IDENTIFICATION AND DOCUMENTATION
A. Zone Map – The Contractor shall create an 11”x17” site plan identifying each building and identifying the zones. The zone map shall be created by a CAD program and shall be posted under plastic cover at the location of the fire alarm control panel.

B. Device Location Map – For each building the Contractor shall create an 11”x17” floor pla n of the building showing the location of each device and the device address as it is annunciated at the control panel and remote annunciator. The device location m ap shall be created by a CAD program and shall be posted under plastic cover at the location of the fire alarm control panel or fire alarm booster power supply within each building.

C. Documentation Cabinet – Provide and install a documentation cabinet marked “FIRE ALARM SYSTEM RECORD DOCUMENTS” located adjacent to each fire alarm control unit.

D. Provide a red label at each branch circuit breaker that supplies power to the Fire Alarm Control Panel and Fire Alarm Booster Power Panels that reads: "FIRE ALARM / ECS”.

E. Provide a label on the inside of the cabinet door of each fire alarm cabinet that is supplied by a branch circuit that identifies the panel, circuit number and location of the power panel that is supplying that fire alarm cabinet.

3.6 FIRE WATCH
A. The Contractor shall provide a fire watch during the course of construction where any portion of the campus is rendered unprotected by the fire alarm system. The Contractor shall provide a 24-hour fire watch each day until the fire alarm system is fully operational. All costs of the fire watch shall be borne by the Contractor.

3.7 ACCEPTANCE TESTING AND CERTIFICATION
A. Prior to the final acceptance test provide the service of a competent, factory - trained engineer or technician authorized by the manufacturer of the fire al arm equipment to technically supervise and participate during all of the adjus tments and tests for the system:
674

22-12479 – Ph 2 FIRE SPRINKLER MONITORING SYSTEM 283100 - 9 of 10

1. Before energizing the cables and wires, check for correct connections and test for short circuits, ground faults, continuity, and insulation.

2. Open initiating device circuits and verify that the trouble signal actuates.

3. Open and short sig naling line circuits and verify that the trouble signal actuates.

4. Open and short Notification Appliance Circuits and verify that trouble signal actuates.

5. Ground all circuits and verify response of trouble signals.

6. Check presence and audibility of tone at all alarm notification devices.

7. Check installation, supervision, and operation of all addressable smoke detectors using the Walk Test.

8. Each of the alarm conditions t hat the system is required to detect should be introduced on the system. Verify the proper r eceipt and the proper processing of the signal at the FACP and the correct activation of the control points.

9. When the system is equipped with optional features, the manufacturer's manual should be consulted to determine the proper testing procedures.

This is intended to address such items as verifying the controls performance by individually addressed or grouped devices, sensitivity monitoring, verification functionality and similar.

B. At the final inspection a manufacturer -trained representative shall demons trate that the system functions properly in every respect.

C. Upon completion of the installation, a test of the entire system shall be performed in the presence of th e Inspector of Record and the local authority having jurisdiction. The local Fire Marshal shall be notified and invited to witness the test a minimum of 72 hours prior to the test. Components and functions of the system shall be tested and an Inspection and Testing Record Form shall be generated in accordance with NFPA 72 indicating the proper functioning of each component of the system.

D. If devices or other components of the system fail during testing the defective devices or components shall be removed and immediately replaced with functional units and the test shall be repeated.

E. Complete the NFPA 72 Record of Completion, testing all devices and appliances.

Provide a copy of the completed Record of Completion to the Owner (School District), Architect, Local Fire Authority and DSA via the Project Inspector.

3.8 INSTRUCTION
A. Provide instruction as requi red for operating the system. "Hands -on" demonstrations of the operation of all system components and the entire system 675

22-12479 – Ph 2 FIRE SPRINKLER MONITORING SYSTEM 283100 - 10 of 10

including program changes and functions shal l be provided. The Contractor and/or the Systems Manufacturer's representatives shall provid e a typewritten "Sequence of Operation" to the Owner.

B. The Contractor shall furnish a reduced set of “as -built” record drawings on 11”x17” bond paper in a plastic co ver showing locations of all devices and the proper address of the device as it is displayed on the LCD annunciator at the fire alarm control panels and/or remote annunciators. This reduced set shall be located adjacent to the fire alarm control panel for the reference of the Authority Having Jurisdiction.

3.9 CLOSEOUT SUBMITTAL
A. The Contractor shall submit closeout submittal documentation consisting of the following items:

1. Full size fire alarm “as -built” record drawings; drawings shall show valid Contractor’s C-10 license, wet-signed by C-10 license holder.

2. Device cut sheets and CSFM listing services;

3. A copy of the Fire Alarm System Record of Completion signed by the Installer and the Inspector of Record;

4. Owner’s Manuals and Operating Instructions.

END OF SECTION 283100
676
22-12479 SITE CLEARING 311000 – 1 of 6
SECTION 311000

SITE CLEARING
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specificat ion Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Protecting existing vegetation to remain.

2. Removing existing vegetation.

3. Clearing and grubbing.

4. Stripping and stockpiling topsoil.

5. Removing above and below-grade site improvements .

6. Disconnecting, capping or sealing, and removing site utilities.

B. Related Sections:

1. Division 01 Section “Construction Waste Manageme nt” for management of waste materials.

2. Division 31 Section “Earthwork.”

1.3 DEFINITIONS
A. Subsoil: Soil beneath the level of subgrade; soi l beneath the topsoil layers of a naturally occurring soil profile, typified by less than 1 percent organic matter and few soil organisms.

B. Surface Soil: Soil that is present at the top la yer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil," but in disturbed areas such as urban environments, the surface soil can be subsoil.

C. Topsoil: Top layer of the soil profile consisti ng of existing native surface topsoil or existing in-place surface soil and is the zone where plant roots grow.

D. Plant-Protection Zone: Area surrounding individ ual trees, groups of trees, shrubs, or other vegetation to be protected during construction, and indicated on Drawings.

1. Tree protection shall be defined by a circle con centric with each tree with a radius 1.5 times the diameter of the drip line unless otherwise indicated E. Vegetation: Trees, shrubs, groundcovers, grass, and other plants. 677
22-12479 SITE CLEARING 311000 – 2 of 6

1.4 MATERIALS OWNERSHIP
A. Except for materials indicated to be stockpiled or otherwise remain Owner's property, cleared materials shall become Contractor's propert y and shall be removed from Project site.

1.5 SUBMITTALS
A. Existing Conditions: Digital photographic docum entation of existing trees and plantings, adjoining construction, and site improve ments that establishes preconstruction conditions that might be misconstru ed as damage caused by site clearing.

B. Record Drawings: Identifying and accurately sho wing locations of capped utilities and other subsurface structural, electrical, and mechanical conditions.

1.6 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.

1.7 FIELD CONDITIONS
A. Traffic: Minimize interference with adjoining r oads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.

1. Do not close or obstruct streets, walks, or othe r adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstru cted traffic ways if required by Owner or authorities having jurisdiction.

B. Salvable Improvements: Carefully remove items i ndicated to be salvaged.

1. Salvage for Reinstallation: Clean and store on-s ite in a secure location, ready for reinstallation.

2. Salvage to Owner: Deliver to Owner’s designated location on-site.

C. Utility Locator Service: Notify utility locator service for area where Project is located before site clearing.

D. Erosion and Sedimentation Control: Do not commen ce site clearing operations until temporary erosion and sedimentation control and pla nt-protection measures are in place.

E. The following practices are prohibited within pr otection zones:

1. Storage of construction materials, debris, or ex cavated material.

2. Parking vehicles or equipment.

3. Foot traffic.

4. Erection of sheds or structures.
678
22-12479 SITE CLEARING 311000 – 3 of 6

5. Impoundment of water.

6. Excavation or other digging unless otherwise ind icated.

7. Attachment of signs to or wrapping materials aro und trees or plants unless otherwise indicated.

F. Do not direct vehicle or equipment exhaust towar ds protection zones.

G. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones.

H. Soil Stripping, Handling, and Stockpiling: Perf orm only when the soil is dry or slightly moist.

PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION

3.1 PREPARATION
A. Comply with the recommendations of the City of M erced standards and specifications for site clearing operations.

B. Protect and maintain benchmarks and survey contr ol points from disturbance during construction.

C. Protect existing site improvements to remain fro m damage during construction.

1. Restore damaged improvements to their original c ondition, as acceptable to Owner.

D. Locate and clearly identify trees, shrubs, and o ther vegetation to remain or to be relocated. Identify trees to remain by wrapping a 1-inch blue vinyl tie tape flag around each tree trunk at 54 inches above the ground.

E. Protect trees, plant growth, and vegetation not specifically designated for removal.

F. Verify that existing plant life to be removed ha s been authorized for removal.

G. Examine site and compare individual work areas w ith the Drawings and Specifications.

H. Thoroughly investigate and verify conditions und er which the work is to be performed.

3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL
A. Comply with Storm Water Pollution Prevention Pla n (SWPPP) and requirements of authorities having jurisdiction.
679
22-12479 SITE CLEARING 311000 – 4 of 6
B. Provide temporary erosion and sedimentation-cont rol measures to prevent soil erosion and discharge of soil-bearing water runoff or airbo rne dust to adjacent properties and walkways, according to requirements of authorities having jurisdiction.

C. Verify that flows of water redirected from const ruction areas or generated by construction activity do not enter or cross protection zones.

D. Inspect, maintain, and repair erosion and sedime ntation-control measures during construction until permanent vegetation has been established.

E. Remove erosion and sedimentation controls and re store and stabilize areas disturbed during removal.

3.3 EXISTING UTILITIES
A. Utilities to Remain: Locate, identify, and prot ect utilities that are to remain from damage.

B. Interrupting Existing Utilities: Do not interru pt utilities serving facilities occupied by Owner or others unless permitted under the followin g conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Architect not less than two days in advan ce of proposed utility interruptions.

2. Do not proceed with utility interruptions withou t Architect's written permission.

C. Utility Termination: Locate, identify, disconne ct, and seal or cap utilities indicated to be removed or abandoned in place. Arrange with utilit y companies to shut off affected utilities and notify Owner not less than 48 hours in advance of utility termination.

1. Excavate for and remove underground utilities in dicated to be removed.

D. Utilities to be Removed: After disconnecting and capping, remove utilities and irrigation piping to at least 5 feet horizontally outside proposed building areas.

1. Abandoned pipelines remaining that are less than 2 inches diameter shall be capped at the cutoff point. Pipes larger than 2 inc hes diameter shall be filled with a 1 sack sand-cement slurry.

3.4 CLEARING AND GRUBBING
A. Prior to any site grading, remove all miscellane ous site obstructions from the improvement area. Clear all areas required for exec ution of work at proposed improvement location.

B. Remove obstructions, trees, shrubs, and other ve getation to permit installation of new construction.
680
22-12479 SITE CLEARING 311000 – 5 of 6

1. Do not remove trees, shrubs, and other vegetatio n indicated to remain or to be relocated.

2. Grind down stumps and remove roots, obstructions , and debris to a depth of not less than 24 inches below the bottom of the lowest structure footing or 2 feet below finished subgrade whichever depth is lower. Root systems deeper than indicated above shall be excavated to allow no root s larger than 2 inches in diameter.

3. Use only hand methods for grubbing within protec tion zones.

4. Chip removed tree branches and dispose of off-si te.

C. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated.

1. Place fill material in horizontal layers not exc eeding a loose depth of 8 inches, and compact each layer to a density equal to adjacent original ground.

3.5 TOPSOIL EXCAVATION
A. Remove sod, grass, and similar vegetation before stripping topsoil. Near surface soils containing vegetation, roots, organics or other obj ectionable material shall be stripped to a depth of at least 3 inches to expose a clean soil surface.

B. Strip topsoil to depth recommended by the City o f Merced standards and specifications in a manner to prevent intermingling with underlying subsoil or other waste materials.

1. Remove subsoil and non-soil materials from topso il, including clay lumps, gravel, and other objects more than 2 inches in diameter; trash, debris, weeds, roots and other waste materials.

2. Where trees or bushes are to be removed, associa ted roots are expected to extend 3 feet or more below existing grade and shal l be removed. Roots larger than ½ inch in diameter shall be removed.

3. Do not incorporate surface strippings into engin eered fill unless the organic content is less than 3 percent by weight (ASTM D2974).

C. Stockpile topsoil away from edge of excavations without intermixing with subsoil.

Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust and erosion by water.

1. Limit height of topsoil stockpiles to 72 inches.

2. Do not stockpile topsoil within protection zones .

3. Dispose of surplus topsoil. Surplus topsoil is that which is not to be reused.

3.6 REMOVAL OF SITE IMPROVEMENTS
A. Remove existing above and below-grade improvemen ts as indicated and necessary to facilitate new construction.
681
22-12479 SITE CLEARING 311000 – 6 of 6
B. Remove slabs, paving, curbs, gutters, and aggreg ate base as indicated. Remove public improvements and paving only where authorize d and necessary to execute the Work.

1. Remove concrete slabs, paving, walks, gutters, a nd curbs to nearest existing joint locations when feasible. When not feasible, n eatly saw-cut joints before removing existing pavement, saw-cut faces vertically.

2. Paint cut ends of steel reinforcement in concret e to remain with two coats of antirust coating, following coating manufacturer's written instructions. Keep paint off surfaces that will remain exposed.

3.7 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Remove surplus soil material, unsuitable topsoil , obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Owner's property.

B. Separate recyclable materials produced during si te clearing from other nonrecyclable materials. Store or stockpile without intermixing with other materials and transport them to recycling facilities. Do not interfere with other Project work.

END OF SECTION
682
22-12479 EARTHWORK 312000 - 1 of 9
SECTION 312000

EARTHWORK
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specificat ion Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Excavating and filling for rough grading the Sit e.

2. Preparing subgrades for slabs-on-grade, walks, p avements, turf and grasses, and plants.

3. Over excavation of building pad and pavement are a.

4. Excavating soil and other material for surface i mprovements.

5. Placing fill.

6. Compaction of existing ground and fill.

7. Preparation of subgrade for other improvements.

8. Grading of soil.

B. Related Sections:

1. Division 31 Section “Site Clearing.”

2. Division 31 Section “Trenching.”

1.3 REFERENCES
A. ASTM D 1557.

1.4 DEFINITIONS
A. Backfill: Soil material or controlled low-streng th material used to fill an excavation.

1. Initial Backfill: Backfill placed beside and ove r pipe in a trench, including haunches to support sides of pipe.

2. Final Backfill: Backfill placed over initial bac kfill to fill a trench.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

C. Bedding Course: Aggregate layer placed over the excavated subgrade in a trench before laying pipe.
683
22-12479 EARTHWORK 312000 - 2 of 9
D. Borrow Soil: Satisfactory soil imported from off -site for use as fill or backfill.

E. Excavation: Removal of material encountered abo ve subgrade elevations and to lines and dimensions indicated.

F. Fill: Soil material used to raise existing grad es.

G. Structures: Buildings, footings, foundations, r etaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other m an-made stationary features constructed above or below the ground surface.

H. Subgrade: Uppermost surface of an excavation.

I. Utilities: On-site underground pipes, conduits, ducts, and cables, as well as underground services within buildings.

1.5 SUBMITTALS
A. Material Test Reports: Classification according to ASTM D 2487 for each borrow soil material proposed for fill and backfill.

B. Request for review of import fill materials not less than 2 weeks prior to importing to site, whether from on-site or off-site borrow areas.

1.6 QUALITY ASSURANCE
A. Preinstallation Conference: Conduct pre-excavat ion conference at Project site.

1.7 FIELD CONDITIONS
A. Utility Locator Service: Notify utility locator service for area where Project is located before beginning earth moving operations.

B. Do not commence earth moving operations until te mporary erosion and sedimentation control measures required by authorities having jurisdiction are in place.

C. Traffic: Minimize interference with adjoining r oads, streets, walks, and other adjacent occupied or used facilities during earth moving operations.

1. Do not close or obstruct streets, walks, or othe r adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstru cted traffic ways if required by Owner or authorities having jurisdiction.

D. Do not commence earth moving operations until pl ant-protection measures are in place.

E. The following practices are prohibited within pr otection zones:
684
22-12479 EARTHWORK 312000 - 3 of 9

1. Storage of construction materials, debris, or ex cavated material.

2. Parking vehicles or equipment.

3. Foot traffic.

4. Erection of sheds or structures.

5. Impoundment of water.

6. Excavation or other digging unless otherwise ind icated.

7. Attachment of signs to or wrapping materials aro und trees or plants unless otherwise indicated.

F. Do not direct vehicle or equipment exhaust towar ds protection zones.

G. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones.

PART 2 - PRODUCTS

2.1 SOIL MATERIALS
A. General: Provide borrow soil materials when suf ficient satisfactory soil materials are not available from excavations.

1. Any borrow soil materials proposed to be brought on-site are subject to inspection and testing by Owner’s geotechnical test ing agency to verify they are in compliance with referenced standards. Owner shal l determine if testing of materials is required prior to any material being b rought onto the site. Testing of materials may take up to two weeks to verify compliance with standards.

B. Soil Types:

1. Soil Type S1: Excavated and re-used material, g raded, free of lumps larger than 3 inches, rocks larger than 2 inches, and debris.

2. Soil Type S2: Excavated and reused material, gr aded, free of roots, lumps greater than one inch, rocks larger than 1/2 inch, debris, weeds and foreign matter.

3. Soil Type S3: Imported topsoil, friable loam; r easonably free of roots, rocks larger than 1/2 inch, debris, weeds, and foreign matter.

4. Soil Type S4: Imported borrow material, suitabl e for purposes intended, non- hazardous, derived from a single, consistent soil t ype source, free of vegetable matter and other unsatisfactory material (less than 3% organic content by weight), meeting the following characteristics:
a. Maximum Particle Size (inches): 3 inches.
b. Maximum Plasticity Index: Less than 12.
c. Percentage Passing #4 Sieve: 65-100%.
d. Percentage Passing #200 Sieve: 20-45%.
e. Expansion Index: Less than 20 (very low expansio n). f. R-Value (in paved areas): Minimum 50.
g. Corrosion Potential:
1) Soluble Sulfates: Less than 1,500 mg/Kg.
685
22-12479 EARTHWORK 312000 - 4 of 9
2) Soluble Chlorides: Less than 300 mg/Kg.
3) Soil Resistivity: Greater than 3,000 ohm-cm

5. Soil Type S5: Imported sand. Natural river or bank sand (sand equivalent greater than 30), washed; free of silt, clay, loam, friable or soluble materials, and organic matter.

C. Soil for Fills:

1. Fill in Turf or Planting Areas: Excavated soils that have been graded and cleansed of excessive organics, debris, rocks, and lumps.

2. Fill in Turf or Other Planting Areas: Type S2 o r S3.

3. Fill in Non-planting Areas: Type S1, S2 or S4.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Contractor shall thoroughly examine the project site prior to submitting a bid to become familiar with the conditions of the site and the conditions required for the work.

B. Contractor shall thoroughly examine contract doc uments prior to bid.

1. Documents do not necessarily indicate a balanced cut/fill site.

2. Contractor shall be responsible for importing ma terials from an off-site location or exporting excess material to an off-site location.

3.2 PREPARATION
A. Site clearing specified in Division 31 Section “ Site Clearing” shall be performed prior to beginning earthwork.

B. Protect structures, utilities, sidewalks, paveme nts, and other facilities from damage caused by settlement, lateral movement, undermining , washout, and other hazards created by earth moving operations. Coordinate exc avations near existing utilities with utility companies.

C. Protect and maintain erosion and sedimentation c ontrols during earth moving operations.

D. Identify required lines, levels, contours and da tum.

E. Locate, identify, and protect existing above and below grade utilities from damage.

F. Protect plant life, lawns, trees, shrubs, and ot her features not authorized for removal.

G. Employ equipment and methods appropriate to the work site. 686
22-12479 EARTHWORK 312000 - 5 of 9
H. Protect excavated areas from drainage inflow, an d provide drainage to all excavated areas.

I. Schedule earthwork operations to avoid working d uring periods of inclement weather.

If unavoidable, Contractor shall provide alternativ e methods for working saturated, unstable soils as indicated by the City of Merced standards and specifications.

3.3 DEWATERING
A. Prevent surface water and ground water from ente ring excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area.

B. Protect subgrades from softening, undermining, w ashout, and damage by rain or water accumulation.

1. Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in excavations. Do not use excavated tr enches as temporary drainage ditches.

C. Dispose of water removed by dewatering in a mann er that avoids endangering public health, property, and portions of work under constr uction or completed. Dispose of water and sediment in a manner that avoids inconvenience to others.

3.4 STORAGE OF SOIL MATERIALS
A. Stockpile excavated satisfactory soil and materi als borrow soil materials without intermixing. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust. Stockpile soil materials a way from edge of excavations. Do not store within drip line of trees to remain.

3.5 EXCAVATION
A. Earthwork shall comply with requirements and rec ommendations of the City of Merced standards and specifications.

1. A representative from the Owner’s geotechnical t esting agency shall be present during earthwork operations.

B. Excavate to indicated elevations and dimensions within a tolerance of plus or minus 1 inch. If applicable, extend excavations a sufficie nt distance from structures for placing and removing concrete formwork, for installing serv ices and other construction, and for inspections.

C. Excavations at Edges of Tree and Plant-Protectio n Zones: Excavate by hand to indicated lines, cross sections, elevations, and su bgrades. Use narrow-tine spading forks to comb soil and expose roots.

1. Do not break, tear, or chop exposed roots. Do n ot use mechanical equipment that rips, tears, or pulls roots.
687
22-12479 EARTHWORK 312000 - 6 of 9

2. Where authorized to cut roots, cut roots with a saw.

D. Excavation for Structures: Following the stripp ing operations, the exposed surface in the area of the planned building improvements and s tructural concrete slabs-on-grade shall be over excavated to a minimum depth of 12 in ches below stripped ground surface or below the bottom of proposed footings, w hichever is greater. The over excavation shall extend at least 5 feet horizontall y beyond perimeter exterior edges of proposed footings, structural concrete slabs-on-gra de or areas to receive fill. The exposed ground surface shall be reviewed by a field representative of the Owner’s Geotechnical Engineer to evaluate if any loose or s oft zones are present that will require additional over excavation per the Geotechn ical Engineer’s recommendations.

Any areas encountered with debris-fill in the subgr ade of the over excavation shall be excavated an additional depth equal to the depth of the debris-fill with the exact depth as determined by a field representative of the Owne r’s Geotechnical Engineer. The bottom of the over excavation shall be scarified, m oisture conditioned to near optimum moisture content, and compacted as required under the “Compaction” Article.

1. Excavations for Footings and Foundations: Do no t disturb bottom of excavation.

Excavate by hand to final grade just before placing concrete reinforcement. Trim bottoms to required lines and grades to leave solid base to receive other work.

E. Excavation for Pavements and Flatwork: Followin g the stripping operations, the exposed surface in the area of proposed paved areas shall be over excavated to a minimum depth of 12 inches below stripped ground su rface or below the proposed pavement subgrade, whichever is deeper. The expose d ground surface shall be reviewed by a field representative of the Owner’s G eotechnical Engineer to evaluate if any loose or soft zones are present that will require additional over excavation. Scarify and moisture-condition as required for areas with s tructures. Compact as required by the “Compaction” Article.

3.6 SUBGRADE INSPECTION
A. If representative of Owner’s geotechnical testin g agency determines that unsatisfactory soil is present, continue excavation and replace wi th compacted backfill or fill material as directed.

B. Proof-roll subgrade below building slabs, paveme nts, and walks with equipment of type, size, and weight recommended by representative of Owner’s geotechnical testing agency to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.

1. Completely proof-roll subgrade in one direction, repeating proof-rolling in direction perpendicular to first direction. Limit vehicle speed to 3 mph.

2. Excavate soft spots, unsatisfactory soils, and a reas of excessive pumping or rutting, as determined by Architect, and replace wi th compacted backfill or fill as directed.

3.7 FILLING, BACKFILLING, AND COMPACTING
688
22-12479 EARTHWORK 312000 - 7 of 9
A. After excavation and just prior to filling, the bottom of excavations shall be scarified to a depth of at least 12 inches, moisture conditioned t o at or above optimum moisture content, and compacted to a minimum of 90 percent o f maximum density based on ASTM Method D 1557.

B. Uniformly moisten or aerate subgrade and each su bsequent fill or backfill soil layer before compaction to within 2 percent of optimum moisture content.

C. Fills shall be placed in lifts not more than 8 i nches thick, moisture conditioned to at or above optimum moisture content, and compacted to values indicated.

D. Place soil fill materials evenly on all sides of structures to required elevations, and uniformly along the full length of each structure.

E. Excavated soils free of deleterious substances ( less than 3% organic content by weight) may be returned to the excavations as engineered fill.

F. Compact soil materials to not less than the foll owing percentages of maximum dry unit weight according ASTM D 1557:

1. Under structures, building slabs, walkways and s teps: 90 percent.

2. Under pavement sections (upper 12 inches of fill ): 95 percent.

3. Under turf or unpaved areas: 85 percent.

G. Acceptance of engineered fill placement will be based on both moisture content at time of compaction and relative compaction.

3.8 GRADING
A. General: Uniformly grade areas to a smooth surf ace, free of irregular surface changes.

Comply with compaction requirements and grade to cr oss sections, lines, and elevations indicated on Drawings.

1. Provide a smooth transition between adjacent exi sting grades and new grades.

2. Cut out soft spots, fill low spots, and trim hig h spots to comply with required surface tolerances.

B. Site Rough Grading: Slope grades to direct wate r away from buildings and to prevent ponding. Finish subgrades to required elevations within the following tolerances:

1. Turf or Unpaved Areas: Plus or minus 1 inch.

2. Walks: Plus or minus 1/2 inch.

3. Pavements: Plus or minus 1/2 inch.

C. Grading inside Building Lines: Finish subgrade to a tolerance of 1/2 inch when tested with a 10-foot straightedge.

3.9 FIELD QUALITY CONTROL
689
22-12479 EARTHWORK 312000 - 8 of 9
A. Testing and Inspecting Agency: Owner will engag e and pay for a qualified independent testing and inspecting agency to perfor m tests and inspections as applicable and prepare reports.

1. Testing and Inspection Agency shall be acceptabl e to the Architect and the Division of the State Architect.

B. The Architect and the Division of the State Arch itect shall have the right to order the testing of any materials used in the construction t o determine if they are of the quality specified.

C. Contractor Responsibilities:

1. The Contractor shall maintain control of the qua lity of materials and workmanship in order to conform with the Drawings and Specifications.

2. To facilitate testing and inspection, the Contra ctor shall:
a. Schedule tests and inspections with the Testing and Inspection Agency sufficiently in advance of operations to allow for the assignment of personnel and for the completion of testing and inspecting responsibilities. b. Provide access to the Work for the designated Te sting and Inspection Agency.
c. Furnish all necessary materials and labor to ass ist the designated Testing and Inspection Agency in obtaining and handling sam ples at the project or other sources of materials.
d. Provide and maintain for the sole use of the Tes ting and Inspection Agency adequate facilities for safe storage of test specimens on the project site.

3. The Contractor shall correct deficiencies in Wor k that test reports and inspections indicate does not comply with the Contract Documents.

D. Testing and Inspection Services:

1. Testing and inspections shall be performed by th e designated Testing and Inspection Agency.

2. Testing and inspections shall be in accordance w ith the 2019 California Building Code, Section 1705A.6 and Table 1705A.6, DSA Testin g and Inspections form DSA 103, and Structural Drawings Special Inspection Criteria.

E. Allow testing agency to inspect and test subgrad es and each fill or backfill layer.

Proceed with subsequent earth moving only after tes t results for previously completed work comply with requirements.

F. Compaction testing will be performed in accordan ce with ASTM D 1557-78 (Method A).

G. If tests indicate work does not meet specified r equirements, recompact, or remove and replace, and retest.

690
22-12479 EARTHWORK 312000 - 9 of 9

3.10 PROTECTION
A. Protecting Graded Areas: Protect newly graded a reas from traffic, freezing, and erosion. Keep free of trash and debris.

B. Repair and reestablish grades to specified toler ances where completed or partially completed surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent construction operations or weather conditions.

1. Scarify or remove and replace soil material to d epth as directed by Architect; reshape and recompact.

C. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.

1. Restore appearance, quality, and condition of fi nished surfacing to match adjacent work, and eliminate evidence of restoration to greatest extent possible.

3.11 CLEANING AND DISPOSAL OF SURPLUS MATERIALS
A. Rake Clean.

B. Remove surplus satisfactory soil and waste mater ials, including unsatisfactory soil, trash, and debris, and legally dispose of them off Owner's property.

C. Adjacent roadways shall be kept clean during the progress of this work.

END OF SECTION
691

THIS PAGE LEFT BLANK
692
22 -12 479 TRENCHING 312005 - 1 of 6
SECTION 312005

TRENCHING
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specificat ion Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Excavating and backfilling trenches for utilitie s and pits for buried utility structures.

B. Related Sections:

1. Division 01 Section "Temporary Facilities and Co ntrols" for temporary controls, utilities, and support facilities; also for tempora ry site fencing if not in another Section.

2. Divisions 21, 22, 23, 26, 27, 28, and 33 Section s as applicable for installing underground mechanical and electrical utilities and buried mechanical and electrical structures.

3. Division 31 Section "Earthwork" for soil types a nd earth moving.

1.3 DEFINITIONS
A. Utility: Any buried or above ground piping, con duit, ducts, and cables, as well as underground services within buildings.

1.4 SUBMITTALS
A. Product Data: For each type of the following ma nufactured products required:

1. Warning tapes.

1.5 PROJECT CONDITIONS
A. Existing Utilities: A diligent attempt has been made to indicate on the Drawings the locations of utilities which may affect the Work. Utility locations are based on information provided by the Owner and limited above grade site observation. The locations of indicated utilities shall be considere d approximate only until exposed by the Contractor.
693
22 -12 479 TRENCHING 312005 - 2 of 6

1. Maintain existing utilities in constant service during construction of the Work.

2. Utility Locator Service: Notify utility locator service for area where Project is located before beginning trenching operations.

B. Traffic: Minimize interference with adjoining r oads, streets, walks, and other adjacent occupied or used facilities during trenching operations.

1. Do not close or obstruct streets, walks, or othe r adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstru cted traffic ways if required by Owner or authorities having jurisdiction.

C. Do not commence trenching operations until tempo rary erosion and sedimentation control measures are in place.

D. Do not commence earth moving operations until pl ant and landscape protection measures are in place.

PART 2 - PRODUCTS

2.1 SOIL MATERIALS
A. General: Provide borrow soil materials when suf ficient satisfactory soil materials are not available from excavations. The acceptance of borrowed soil materials shall be subject to review and approval by the architect.

B. Satisfactory Soils:

1. Soil Type S1: Excavated and re-used material, g raded, free of lumps larger than 3 inches, rocks larger than 2 inches, and debris.

2. Soil Type S2: Excavated and reused material, gr aded, free of roots, lumps greater than one inch, rocks larger than ½ inch, de bris, weeds and foreign matter.

3. Soil Type S3: Imported topsoil, friable loam; r easonably free of roots, rocks larger than ½ inch, debris, weeds, and foreign matter.

4. Soil Type S4: Imported borrow, suitable for pur poses intended, free of vegetable matter and other unsatisfactory material, with mini mum R value of 10 and as required by Division 01 Section “Earthwork”.

C. Sand: ASTM C 33; fine aggregate.

2.2 ACCESSORIES
A. Warning Tape: Acid- and alkali-resistant, polye thylene film warning tape manufactured for marking and identifying underground utilities, 6 inches wide and 4 mils thick, continuously inscribed with a description of the utility.

1. Detectable Warning Tape: Provided detectable wa rning tape for underground utilities that would otherwise not be detectable by above ground utility locating 694
22 -12 479 TRENCHING 312005 - 3 of 6
methods. Detectable warning tape shall include met allic core encased in a protective jacket for corrosion protection and be d etectable by a metal detector when tape is buried up to 30 inches deep.

2. Colors: Warning tape shall be colored as follow s:
a. Red: Electric.
b. Yellow: Gas.
c. Orange: Telephone and other communications.
d. Blue: Water systems.
e. Green: Sewer systems.

PART 3 - EXECUTION

3.1 PREPARATION
A. Protect structures, utilities, sidewalks, paveme nts, and other facilities from damage caused by settlement, lateral movement, undermining , washout, and other hazards created by trenching operations.

B. Locate, identify, and mark existing underground utilities.

C. Protect plant life, lawns, trees, shrubs, and ot her features not authorized for removal.

D. Protect and maintain erosion and sedimentation c ontrols during trenching operations.

E. Protect subgrades and foundation soils from free zing temperatures and frost. Remove temporary protection before placing subsequent materials.

F. Comply with all provisions of the Construction S afety Orders and General Safety Orders of the California Division of Industrial Saf ety, as well as all other applicable regulations as they pertain to the protection of wo rkers from the hazard of caving ground in excavations.

G. Prevent surface water and ground water from ente ring excavations and from flooding Project site and surrounding area. Protect excavat ions from softening and damage by rain or water accumulation.

1. Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in excavations. Do not use excavated tr enches as temporary drainage ditches.

3.2 EXCAVATION FOR UTILITY TRENCHES
A. Provide protection for all open excavations, bac kfill trenches on same day in which excavation occurs to avoid leaving excavations open overnight.

B. Excavate trenches to lines, depths, and widths r equired for installation of utilities. 695
22 -12 479 TRENCHING 312005 - 4 of 6
C. Cut trenches just wide enough to enable installa tion of utilities and proper backfill, and to allow inspection.

D. Employ equipment and methods appropriate to the work site. Small mechanical excavators may be used only in areas where there is sufficient space so as not to damage adjacent improvements, and where the locatio ns of all existing utilities have been determined.

E. Use hand excavation methods to locate and expose existing utilities along the route of the new work prior to using any mechanical equipmen t. If mechanical equipment is allowed at a particular location, it may only be us ed after the completion by the Contractor of a successful exhaustive search by han d methods to locate all existing facilities as indicated on the plans, and as indica ted on the ground by utility locating service or Owner.

F. When excavating through tree roots, perform work by hand and cut roots, where authorized, with a saw.

G. Excavate trenches to provide not less than the m inimum cover required.

H. Do not interfere with 45 degree bearing splay of foundations.

I. Hand trim excavations for bell and spigot pipe j oints. Remove loose matter.

J. Place and compact bedding course on trench botto ms and where indicated. Shape bedding course to provide continuous support for be lls, joints, and barrels of pipes and for joints, fittings, and bodies of conduits.

K. Excavate trenches, pits or holes bottoming in ha rdpan to a minimum of 6 inches below the grade for the bottom of the pipe and any coupli ngs, and then backfill to the pipe grade with satisfactory soil material, thoroughly compacted. No additional payment will be made for such over-excavation and refill.

L. In trenches where a firm foundation is not encou ntered, such as soft, spongy, or otherwise unsuitable material, remove the material to a minimum of 12 inches below the bottom of the proposed pipe or structure, or to a depth determined by the Engineer, and backfill the space with satisfactory soil mater ial containing sufficient moisture to produce maximum compaction. No additional payment will be made for such additional excavation or backfill.

M. Stockpile excavated material to be returned to t rench adjacent to trench in location which will not be detrimental to existing improvements, trees, or pedestrian or vehicular traffic. Cover to prevent windblown dust. Remove unsuitable or excess material not being used, from site.

N. In areas of sandy soils, shoring and sloping bac k the trench sidewalls may be required.

3.3 BACKFILL FOR UTILITY TRENCHES
A. Prior to placing backfill in excavations, comple te the following:
696
22 -12 479 TRENCHING 312005 - 5 of 6

1. Survey locations of underground utilities for Re cord Documents.

2. Test and inspect underground utilities.

3. Remove trash and debris.

4. Remove temporary shoring and bracing.

B. Backfilling and Compaction: Carefully place and compact backfill of satisfactory soil materials as follows:

1. Install bedding per pipe manufacturer recommenda tions.

2. Initial Backfill: Place initial backfill of sat isfactory soil free of particles larger than 1 inch in any dimension, to a height of 12 inches o ver the pipe or conduit.

Carefully compact initial backfill evenly on both s ides and along the full length of piping or conduit to avoid damage or displacement of piping or conduit.

3. Subsequent Backfill: Place backfill of satisfac tory soil material in layers not more than 8 inches in loose depth and carefully compact.

4. Final Backfill: Place final backfill in thickne ss required, but not more than 8 inches, to achieve final subgrade elevation after c ompaction and as required for grading.

5. Compaction: Compact soil using hand operated ta mpers or lightweight power operated tamping equipment that will not damage or displace installed utilities.

Compact each layer of backfill to not less than the following percentages of maximum dry unit weight according to ASTM D 1557:
a. Turf or Unpaved Areas: 85%.
b. Areas Under Paving: 95% for the top 24 inches b elow the subgrade elevation, 90% for depths over 24 inches below the finish grade elevation.

C. Trenches under Roadways: Provide 4-inch thick, concrete-base slab support for piping or conduit less than 30 inches below surface of roa dways. After installing and testing, completely encase piping or conduit in a minimum of 4 inches of concrete before backfilling or placing roadway subbase course. Con crete is specified in Division 03 Section "Cast-in-Place Concrete."
D. Install warning tape directly above utilities, 1 2 inches below finished grade, except 6 inches below subgrade under pavements and slabs.

E. Soil Moisture Control: Uniformly moisten or aer ate soil materials before compaction to within 2 percent of optimum moisture content.

1. Do not over moisten or flood trenches to move or settle soil materials.

2. Do not place backfill or fill soil material on s urfaces that are muddy, frozen, or contain frost or ice.

3. Remove and replace, or scarify and air dry, othe rwise satisfactory soil material that exceeds optimum moisture content by 2 percent and is too wet to compact to specified dry unit weight.

F. Grading: Uniformly grade areas to be smooth and flush with adjacent grade free of irregular or abrupt surface changes. Provide final grading in turf or landscaped areas where no further grading will occur.
697
22 -12 479 TRENCHING 312005 - 6 of 6

3.4 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified g eotechnical engineering testing agency to perform tests and inspections.

B. Allow testing agency to inspect and test each fi ll or backfill layer. Proceed with subsequent Work only after test results for previou sly completed work comply with requirements.

C. Testing agency will test compaction of soils in place according to ASTM D 1557. Tests will be performed at the following locations and frequencies:

1. Trench Backfill: At each compacted initial and final backfill layer, at least one test for every 150 feet or less of trench length, but no fewer than two tests.

D. When testing agency reports that backfills have not achieved degree of compaction specified, scarify and moisten or aerate, or remove and replace soil materials to depth required; recompact and retest until specified compaction is obtained.

3.5 PROTECTION
A. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.

1. Restore appearance, quality, and condition of fi nished surfacing to match adjacent work, and eliminate evidence of restoration to greatest extent possible.

3.6 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Remove surplus satisfactory soil and waste mater ials, including unsatisfactory soil, trash, and debris, and legally dispose of them off Owner's property.

END OF SECTION
698
22-12479 ASPHALT PAVING 321216 - 1 of 7
SECTION 321216

ASPHALT PAVING
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specificat ion Sections, apply to this Section.

B. SSCDOT – Standard Specifications, State of Calif ornia, Department of Transportation (Caltrans) latest edition, except references to met hod of payment, and references to any state furnished materials.

1.2 SUMMARY
A. Section Includes:

1. Hot-mix asphalt patching.

2. Hot-mix asphalt paving.

3. Aggregate base course.

4. Soil sterilant and treatment
B. Related Sections:

1. Division 31 Section "Earthwork."

2. Division 32 Section “Paving Specialties” for pav ement markings, wheel stops, and site signage.

1.3 DEFINITION
A. Hot-Mix Asphalt Paving Terminology: Refer to AS TM D 8 for definitions of terms.

1.4 SUBMITTALS
A. Product Data: For each type of product indicate d. Include technical data and tested physical and performance properties.

1. Job-Mix Designs: Certification, by authorities having jurisdiction, of approval of each job mix proposed for the Work.

2. Job-Mix Designs: For each job mix proposed for the Work.

B. Material Certificates: For each paving material , from manufacturer.

C. Material Test Reports: For each paving material .
699
22-12479 ASPHALT PAVING 321216 - 2 of 7

1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications: A paving-mix manuf acturer registered with and approved by authorities having jurisdiction or the California Department of Transportation.

B. Regulatory Requirements: Comply with materials, workmanship, and other applicable requirements of Section 39 of the Caltrans Specifications.

1. Measurement and payment provisions and safety pr ogram submittals included in standard specifications do not apply to this Section.

C. All improvements within property owned by a City , County, or State Entity shall be in accordance with the Standards and Specifications of the authority having jurisdiction.

1.6 PROJECT CONDITIONS
A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp, if rain is imminent or expected b efore time required for adequate cure, or if the following conditions are not met:

1. Prime Coat: Minimum surface temperature of 50 d eg F.

2. Tack Coat: Minimum surface temperature of 50 de g F.

3. Slurry Coat: Comply with weather limitations in ASTM D 3910.

4. Asphalt Base Course: Minimum surface temperatur e of 50 deg F and rising at time of placement.

5. Asphalt Surface Course: Minimum surface tempera ture of 50 deg F at time of placement.

PART 2 - PRODUCTS

2.1 AGGREGATES
A. Aggregates: The grading and proportioning of ag gregates shall be such that the combined mineral aggregate conforms to the specifie d requirements. All aggregates shall be clean and free from decomposed materials, organic materials, and other deleterious substances.

1. Aggregates for base course shall conform to Sect ion 26 of the State Standard Specifications, Class 2 for 3/4 inch maximum size gradation.

2. Aggregates for asphaltic concrete shall conform to Section 39 of the State Standard Specifications. Aggregate grading shall be 3/4 inch maximum, medium for 1-1/2 inches or greater in total new pavement t hickness. Aggregate grading shall be 3/8 inch maximum for play courts and running track areas.

2.2 ASPHALT MATERIALS
A. Asphalt Binder: PG 64-10 in accordance with Sect ion 92 of the Caltrans Specifications. 700
22-12479 ASPHALT PAVING 321216 - 3 of 7
B. Asphalt Cement: ASTM D 946 for penetration-grad ed material.

C. Prime Coat: Asphalt emulsion prime coat complyi ng with Section 93 of the Caltrans Specifications. Prime coat is not required unless specifically noted on the Drawings.

D. Tack Coat: Asphaltic emulsion for use as tack c oat shall be of the penetration type conforming to the requirements of Section 94 of the Caltrans Specifications.

E. Water: Potable.

2.3 AUXILIARY MATERIALS
A. Herbicide/Soil Sterilant: Commercial chemical f or weed control, registered by the EPA.

Provide in granular, liquid, or wettable powder for m. Herbicide/soil sterilant shall comply with current EPA regulations at time of application.

1. Product: Dow AgroSciences; Treflan Weed and Gra ss Preventer, or approved equal.

B. Sand: ASTM D 1073, Grade Nos. 2 or 3.

C. Joint Sealant: ASTM D 6690, Type I, hot-applied , single-component, polymer-modified bituminous sealant.

2.4 MIXES
A. Hot-Mix Asphalt: Asphalt concrete shall be Type A and shall conform to the provisions of Section 39 of the Caltrans Specifications. The asphalt binder shall be steam refined paving asphalt classified as PG 64-10 in accordance with Section 92 of the Caltrans Specifications.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Geotechnical Engineer shall verify that subgrade is stable and in suitable condition to begin paving.

B. Proceed with paving only after unsatisfactory co nditions have been corrected.

3.2 SURFACE PREPARATION
A. Subgrade preparation shall be as specified in Di vision 31 Section “Earthwork.” B. Prior to construction of base course and asphalt ic concrete, clean previously constructed subgrade or subbase of all foreign subs tances. The surfaces shall be inspected for the specified compaction and trueness to line and grade. 701
22-12479 ASPHALT PAVING 321216 - 4 of 7
C. Base Course: Aggregate base shall be placed in accordance with requirements of Section 26 of the State Standard Specifications and to the thickness shown. The materials shall be graded and compacted in maximum 4-inch layers to at least 92 percent of maximum density (ASTM D 1557).

1. The base course shall be maintained until the as phaltic pavement is in place.

Maintenance shall include drainage, rolling, shapin g, and watering as necessary to maintain the course in proper condition. Suffic ient moisture shall be maintained at the surface to prevent a dusty condit ion by light sprinkling with water. Areas of completed base course that are dam aged by freezing shall be conditioned, reshaped and recompacted in accordance with the requirements of this specification, without additional cost to the Owner.

D. Immediately before placing asphalt materials, re move loose and deleterious material from substrate surfaces. Ensure that prepared base course is ready to receive paving.

E. Herbicide/Soil Sterilant Treatment: Apply herbi cide/soil sterilant solution over surface to receive pavement or surfacing prior to the start of pavement or surfacing installation.

1. Thoroughly water soak surface to be treated, avo id excess water runoff.

2. Apply in spray form according to manufacturer's written application instructions at rates recommended manufacturer and in compliance with the State of California.

3. Limit application to areas immediately under are as to be paved, use shields or other means to protect adjacent areas. Do not apply under windy conditions.

F. Prime Coat: Prime Coat is only required if indi cated on Drawings. It shall be the Contractor’s option to apply Prime Coat if not indi cated on the Drawings. Apply uniformly over surface of compacted unbound-aggrega te base course at a rate of 0.15 to 0.50 gal./sq. yd. Apply enough material to pene trate and seal but not flood surface.

Allow prime coat to cure.

1. If prime coat is not entirely absorbed within 24 hours after application, spread sand over surface to blot excess asphalt. Use enou gh sand to prevent pickup under traffic. Remove loose sand by sweeping befor e pavement is placed and after volatiles have evaporated.

2. Protect primed substrate from damage until ready to receive paving.

G. Tack Coat: Apply uniformly to vertical surfaces abutting or projecting into new, hot mix asphalt paving at a rate of 0.05 to 0.15 gal./sq. y d. Tack coat will not be required over surfaces of existing pavement unless indicated on t he Drawings. Where indicated it shall be applied uniformly to existing pavement sur faces at a rate of 0.05 to 0.15 gal./sq. yd.

1. Allow tack coat to cure undisturbed before apply ing hot-mix asphalt paving.

2. Avoid smearing or staining adjoining surfaces, a ppurtenances, and surroundings.

Remove spillages and clean affected surfaces.

702
22-12479 ASPHALT PAVING 321216 - 5 of 7

3.3 HOT-MIX ASPHALT SPREADING, LAYING, AND COMPACTI NG
A. Spreading and laying operations shall conform to the requirements of Sections 39-5 and 39-6 of the Caltrans Specifications. Where the total depth of paving exceeds 0.20 feet, the top layer of asphalt concrete shall not e xceed 0.20 feet in compacted thickness. The aggregate for this layer and all lo wer layers shall be 3/4” maximum aggregate (medium). The next lower layer shall not exceed 0.25 feet in compacted thickness. Any lower layers shall not exceed 0.25 feet in compacted thickness. For total asphalt concrete thickness of 3 inches or gre ater, the minimum layer thicknesses shall be 1.5 inches compacted. Total asphalt concr ete thicknesses of 3 inches may be placed in one layer at Contractor’s option. No asp halt concrete paving shall be placed when the atmospheric temperature is below 50 degree s Fahrenheit. Compaction operations shall conform to the requirements of Sec tion 39-6.03 of the Caltrans Specifications.

B. Place paving in consecutive strips not less than 10 feet wide unless infill edge strips of a lesser width are required.

1. After first strip has been placed and rolled, pl ace succeeding strips and extend rolling to overlap previous strips. Complete a sec tion of asphalt base course before placing asphalt surface course.

C. Promptly correct surface irregularities in pavin g course behind paver. Use suitable hand tools to remove excess material forming high spots. Fill depressions with hot-mix asphalt to prevent segregation of mix; use suitable hand tools to smooth surface.

D. All utility boxes and/or manholes shall be set f lush with finished grade after placing final lift of asphalt paving, unless noted otherwise.

3.4 INSTALLATION TOLERANCES
A. Pavement Thickness: Compact each course to prod uce the thickness indicated within the following tolerances:

1. Base Course: Plus or minus 1/2 inch.

2. Surface Course: Plus 1/2 inch, no minus.

B. Pavement Surface Smoothness: Compact each cours e to produce a surface smoothness within the following tolerances as deter mined by using a 10-foot straightedge applied transversely or longitudinally to paved areas:

1. Base Course: 1/4 inch.

2. Surface Course: 1/4 inch.

3.5 PATCHING
A. Hot-Mix Asphalt Pavement: Saw cut perimeter of patch and excavate existing pavement section to sound base. Excavate rectangul ar or trapezoidal patches, extending 12 inches into adjacent sound pavement, u nless otherwise indicated. Cut 703
22-12479 ASPHALT PAVING 321216 - 6 of 7
excavation faces vertically. Remove excavated mate rial. Recompact existing unbound-aggregate base course to form new subgrade.

B. Tack Coat: Apply uniformly to vertical surfaces abutting or projecting into new, hot-mix asphalt paving at a rate of 0.05 to 0.15 gal./sq. yd. .

1. Allow tack coat to cure undisturbed before apply ing hot-mix asphalt paving.

2. Avoid smearing or staining adjoining surfaces, a ppurtenances, and surroundings.

Remove spillages and clean affected surfaces.

C. Patching: Fill excavated pavements with hot-mix asphalt base mix for full thickness of patch and, while still hot, compact flush with adjacent surface.

3.6 REPAIRS
A. Leveling Course: Install and compact leveling c ourse consisting of hot-mix asphalt surface course to level sags and fill depressions d eeper than 1 inch in existing pavements.

1. Install leveling wedges in compacted lifts not e xceeding 3 inches thick.

B. Crack and Joint Filling: Remove existing joint filler material from cracks or joints to a depth of 1/4 inch.

1. Clean cracks and joints in existing hot-mix asph alt pavement.

2. Use emulsified-asphalt slurry to seal cracks and joints less than 1/4 inch wide.

Fill flush with surface of existing pavement and remove excess.

3. Use hot-applied joint sealant to seal cracks and joints more than 1/4 inch wide.

Fill flush with surface of existing pavement and remove excess.

3.7 FIELD QUALITY CONTROL
A. Testing Agency: Owner shall engage a qualified testing agency to perform tests and inspections. Agency shall be qualified according to ASTM D 3666 for testing indicated.

B. Thickness: In-place compacted thickness of hot- mix asphalt courses will be determined according to ASTM D 3549.

C. Surface Smoothness: Finished surface of each ho t-mix asphalt course will be tested for compliance with smoothness tolerances.

D. In-Place Density: Testing agency will take samp les of uncompacted paving mixtures and compacted pavement according to ASTM D 979.

1. Reference maximum theoretical density will be de termined by averaging results from four samples of hot-mix asphalt-paving mixture delivered daily to site, prepared according to ASTM D 2041, and compacted ac cording to job-mix specifications.

2. In-place density of compacted pavement will be d etermined by testing core samples according to ASTM D 1188 or ASTM D 2726.
704
22-12479 ASPHALT PAVING 321216 - 7 of 7
a. One core sample will be taken for every 1000 sq. yd. or less of installed pavement, with no fewer than 3 cores taken.
b. Field density of in-place compacted pavement may also be determined by nuclear method according to ASTM D 2950 and correla ted with ASTM D 1188 or ASTM D 2726.

E. Replace and compact hot-mix asphalt where core t ests were taken.

F. Remove and replace or install additional hot-mix asphalt where test results or measurements indicate that it does not comply with specified requirements. Additional construction, testing, and replacement costs result ing from damaged or improperly installed infrastructure shall be paid for by the Contractor.

3.8 DISPOSAL
A. Except for material indicated to be recycled, re move excavated materials from Project site and legally dispose of them in an EPA-approved landfill.

1. Do not allow milled materials to accumulate on-s ite.

END OF SECTION
705

THIS PAGE LEFT BLANK
706
22-12479 ASPHALT PAVING SEALING 321218 - 1 of 3
SECTION 321218

ASPHALT PAVING SEALING
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specificat ion Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Slurry coating of existing asphalt paved surface s.

B. Related Sections:

1. Division 32 Section "Paving Specialties" for pav ement markings, wheel stops, and parking lot signage.

1.3 SUBMITTALS
A. Product Data: For each type of product indicate d. Include technical data and tested physical and performance properties.

1. Job-Mix Designs: For each job mix proposed for the Work.

B. Material Certificates: For each paving material , from manufacturer.

C. Material Test Reports: For each paving material .

1.4 FIELD CONDITIONS
A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp, if rain is imminent or expected b efore time required for adequate cure, or if the following conditions are not met:

1. Slurry Coat: Comply with weather limitations in ASTM D 3910. 707
22-12479 ASPHALT PAVING SEALING 321218 - 2 of 3
PART 2 - PRODUCTS

2.1 MATERIALS
A. General: Use materials and gradations that have performed satisfactorily in previous installations.

B. Asphalt Binder: AASHTO M 320 or AASHTO MP 1a.

C. Water: Potable.

D. Fine Aggregate: ASTM D 1073 or AASHTO M 29, Gra de Nos. 2 or 3; sharp-edged natural sand or sand prepared from stone, gravel, c ured blast-furnace slag, or combinations thereof.

E. Mineral Filler: ASTM D 242/D 242M or AASHTO M 17 , rock or slag dust, hydraulic cement, or other inert material.

F. Joint Sealant: ASTM D 6690 or AASHTO M 324, Typ e I, hot-applied, single- component, polymer-modified bituminous sealant.

2.2 MIXES
A. Emulsified-Asphalt Slurry: ASTM D 3910, Type 1.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Verify that existing surfaces contain no loose s urface materials are in suitable condition to begin to receive slurry coat.

B. Proceed with work only after unsatisfactory cond itions have been corrected.

3.2 PREPARATION
A. Wash down exiting paving areas with water and sq ueegee surface water to drain.

Allow entire area to completely dry before proceeding with slurry coat.

3.3 REPAIRS
A. Crack and Joint Filling: Clean cracks and joint s in existing asphalt pavement, remove existing joint filler material from cracks or joints to a depth of 1/4 inch .

1. Use emulsified-asphalt slurry to seal cracks and joints less than 1/4 inch wide.

Fill flush with surface of existing pavement and remove excess. 708
22-12479 ASPHALT PAVING SEALING 321218 - 3 of 3

2. Use hot-applied joint sealant to seal cracks and joints more than 1/4 inch wide.

Fill flush with surface of existing pavement and remove excess.

3.4 SURFACE TREATMENTS
A. Slurry Seals: Apply slurry coat in a uniform th ickness according to ASTM D 3910 and allow to cure.

1. Roll slurry seal to remove ridges and provide a uniform, smooth surface.

3.5 PROTECTION
A. Allow slurry seal to fully cure before allowing traffic on sealed surfaces.

END OF SECTION
709

THIS PAGE LEFT BLANK
710
22-12479 CONCRETE PAVING AND WALKS 321313 - 1 of 12
SECTION 321313

CONCRETE PAVING AND WALKS
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specificat ion Sections, apply to this Section.

B. SSCDOT – Standard Specifications, State of Calif ornia, Department of Transportation (Caltrans) latest edition, except references to met hod of payment, and references to any state furnished materials.

1.2 SUMMARY
A. Section Includes: Concrete paving for the follo wing:

1. Driveways.

2. Parking lots.

3. Curbs, gutters, walks, planter walls and pedestr ian paving.

4. Off-site public improvements.

B. Related Sections:

1. Division 03 Section "Cast-in-Place Concrete" for general building applications of concrete.

2. Division 31 Section “Earthwork.”

3. Division 32 Section “Paving Specialties” for pav ement markings, wheel stops, detectable warning surfaces, and site signage.

1.3 DEFINITIONS
A. Cementitious Materials: Type II gray Portland C ement conforming to the specifications of ASTM C150-02a and the requirements of Caltrans S pecification Section 90 for “Type II Modified” portland cement.

1.4 SUBMITTALS
A. Product Data: For each type of product indicate d.

B. Design Mixtures: For each concrete paving mixtu re. Include alternate design mixtures when characteristics of materials, Project conditio ns, weather, test results, or other circumstances warrant adjustments.

C. Material Test Reports: For each of the followin g:
711
22-12479 CONCRETE PAVING AND WALKS 321313 - 2 of 12

1. Aggregates. Include service-record data indicat ing absence of deleterious expansion of concrete due to alkali-aggregate reactivity.

D. Delivery Tags: Delivery tags for all concrete.

1.5 QUALITY ASSURANCE
A. All improvements within property owned by a City , County, or State Entity shall be in accordance with the Standards and Specifications of the authority having jurisdiction.

B. Installer Qualifications: A qualified installer who employs on Project personnel who shall be thoroughly familiar with the specified req uirements, completely trained and experienced in the necessary skills required for wo rk performed under this Section. In actual installation of the work of this Section, use adequate numbers of skilled workmen to insure installation in strict accordance with the contract documents design.

C. Concrete Manufacturer Qualifications: A firm ex perienced in manufacturing ready- mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.

D. Source Limitations: Obtain each type or class o f cementitious material of the same brand from the same manufacturer's plant, obtain ag gregate from single source, and obtain admixtures from single source from single manufacturer.

E. ACI Publications: Comply with the following unl ess modified by requirements in the Contract Documents:

1. ACI 301, "Specifications for Structural Concrete ," Sections 1 through 5.

2. ACI 318-14, “Building Code Requirements for Stru ctural Concrete” with amendments per 2019 California Building Code, Chapter 19A, Section 1905A.

3. ACI 117, "Specifications for Tolerances for Conc rete Construction and Materials."

1.6 ACCESSIBILITY REQUIREMENTS FOR PEDESTRIAN PAVIN G
A. Concrete paving for accessible pedestrian routes for persons with disabilities shall comply with the following per 2019 California Building Code (CBC) requirements:

1. Changes in Level: 1/4 inch maximum vertical cha nge in level; changes greater than 1/4 inch to not more than 1/2 inch shall be be veled with a slope not exceeding 1:2 vertical to horizontal; offsets exceeding 1/2 inch shall be by a ramp (CBC 11B-303).

2. Cross Slope of Walks and Ramps: 1/4:12 maximum (CBC 11B-403.3).

3. Slope of Pedestrian Pavements: 1/4:12 maximum i n any direction where there is no defined direction of travel (CBC 11B-403.3).

4. Slope of Door and Ramp Landings: 1/4:12 maximum in any direction (CBC 11B- 404.2.4.4 and 11B-405.7.1). Changes in level are n ot permitted within door and ramp landings.
712
22-12479 CONCRETE PAVING AND WALKS 321313 - 3 of 12

5. Slope of Parking Stalls and Access Aisles for Pe rsons with Disabilities: 1/4:12 maximum in any direction (CBC 11B-502.4). Changes in level are not permitted within accessible parking stalls and access aisles.

6. Slope of walks in the direction of travel: 1:20 (5%) maximum (CBC 11B-403.3).

7. Slope of Ramps in the Direction of Travel: 1:12 (8.33%) maximum (CBC 11B- 405.2).

8. With of Walks and Ramps: 48 inches minimum clea r width (CBC 11B-403.5.1 and 11B-405.5).

PART 2 - PRODUCTS

2.1 FORM MATERIALS
A. Form Materials: Plywood, metal, metal-framed pl ywood, or other approved panel-type materials to provide full-depth, continuous, straight, and smooth exposed surfaces.

1. Use flexible or uniformly curved forms for curve s with a radius of 100 feet or less. Do not use notched and bent forms.

B. Form-Release Agent: Commercially formulated for m-release agent that will not bond with, stain, or adversely affect concrete surfaces and that will not impair subsequent treatments of concrete surfaces.

2.2 STEEL REINFORCEMENT
A. Plain-Steel Welded Wire Reinforcement: ASTM A 1 85/A 185M, fabricated from steel wire into flat sheets.

B. Reinforcing Bars: ASTM A 615/A 615M, Grade 60; deformed.

C. Joint Dowel Bars: ASTM A 615/A 615M, Grade 60 p lain-steel bars. Cut bars true to length with ends square and free of burrs.

D. Bar Supports: Bolsters, chairs, spacers, and ot her devices for spacing, supporting, and fastening reinforcing bars, welded wire reinfor cement, and dowels in place.

Manufacture bar supports according to CRSI's "Manua l of Standard Practice" from steel wire, plastic, or precast concrete of greater compressive strength than concrete specified, and as follows:

1. Equip wire bar supports with sand plates or hori zontal runners where base material will not support chair legs.

2.3 CONCRETE MATERIALS
A. Cementitious Material: Use the following cement itious materials, of same type, brand, and source throughout Project:
713
22-12479 CONCRETE PAVING AND WALKS 321313 - 4 of 12

1. Portland Cement: Type II gray Portland Cement c onforming to the specifications of ASTM C150-02a and the requirements of Caltrans Specification Section 90 for “Type II Modified” Portland Cement.

B. Normal-Weight Aggregates: ASTM C 33, uniformly graded. Provide aggregates from a single source with documented service-record data of at least 10 years' satisfactory service in similar paving applications and service conditions using similar aggregates and cementitious materials.

1. Maximum Coarse-Aggregate Size: 1 inch nominal.

2. Fine Aggregate: Free of materials with deleteri ous reactivity to alkali in cement.

C. Water: Potable and complying with ASTM C 94/C 9 4M.

2.4 CURING MATERIALS
A. Moisture-Retaining Cover: ASTM C 171, polyethyl ene film or white burlap- polyethylene sheet.

B. Water: Potable.

C. Evaporation Retarder: Waterborne, monomolecular , film forming, manufactured for application to fresh concrete.

D. Clear, Waterborne, Membrane-Forming Curing Compo und: ASTM C 309, Type 1, Class B, dissipating. It shall be the Contractor’s responsibility to verify that all curing compounds used comply with the VOC Emission require ments of the San Joaquin Valley Air Pollution Control District.

2.5 RELATED MATERIALS
A. Joint Fillers: ASTM D 1751, asphalt-saturated c ellulosic fiber in preformed strips.

2.6 CONCRETE MIXTURES
A. General: Concrete mixtures shall comply with re quirements of authorities having jurisdiction.

B. Mixtures for concrete pavements, gutters and cur bs subject to vehicular traffic:

1. Concrete shall be Class 2 (Previous years denote d as Class A) and shall contain 564 pounds minimum (6 sacks) of Portland Cement per cubic yard conforming to the requirements of Section 90 of the Caltrans Specifications. a. Use a qualified independent testing agency for p reparing and reporting proposed concrete design mixtures for the trial batch method.

2. Proportion mixtures to provide normal-weight con crete with the following properties:
714
22-12479 CONCRETE PAVING AND WALKS 321313 - 5 of 12
a. Compressive Strength (28 Days): 3000 psi minimu m.
b. Maximum Water-Cementitious Materials Ratio at Po int of Placement: 0.50. c. Slump Limit: 4 inches maximum.

C. Mixtures for concrete walks, gutters and curbs s ubject to only pedestrian traffic:

1. Concrete shall be Class 3 (Previous years denote d as Class B) and shall contain 505 pounds minimum (5 sacks) of Portland Cement per cubic yard conforming to the requirements of Section 90 of the Caltrans Spec ifications unless noted otherwise on the drawings.
a. Use a qualified independent testing agency for p reparing and reporting proposed concrete design mixtures for the trial batch method.

2. Proportion mixtures to provide normal-weight con crete with the following properties:
a. Compressive Strength (28 Days): 2500 psi minimu m.
b. Maximum Water-Cementitious Materials Ratio at Po int of Placement: 0.58. c. Slump Limit: 5 inches maximum.

D. Limit water-soluble, chloride-ion content in har dened concrete to 0.15 percent by weight of cement.

2.7 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, and mix c oncrete materials and concrete according to ASTM C 94/C 94M. Furnish batch certif icates for each batch discharged and used in the Work.

1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air tempe rature is above 90 deg F, reduce mixing and delivery time to 60 minutes.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine exposed subgrades and base surfaces for compliance with requirements for dimensional, grading, and elevation tolerances.

B. Proof-roll prepared base surface below concrete paving to identify soft pockets and areas of excess yielding.

1. Completely proof-roll subbase in one direction a nd repeat in perpendicular direction. Limit vehicle speed to 3 mph.

2. Proof-roll with a pneumatic-tired and loaded, 10 -wheel, tandem-axle dump truck weighing not less than 15 tons.

3. Correct subbase with soft spots and areas of pum ping or rutting exceeding depth of 1/2 inch according to requirements in Division 31 Section "Earthwork" 715
22-12479 CONCRETE PAVING AND WALKS 321313 - 6 of 12
C. Proceed with installation only after unsatisfact ory conditions have been corrected.

3.2 PREPARATION
A. Remove loose material from compacted subbase sur face immediately before placing concrete.

3.3 EDGE FORMS AND SCREED CONSTRUCTION
A. Set, brace, and secure edge forms, bulkheads, an d intermediate screed guides to required lines, grades, and elevations. Install fo rms to allow continuous progress of work and so forms can remain in place at least 24 hours after concrete placement.

B. Clean forms after each use and coat with form-re lease agent to ensure separation from concrete without damage.

3.4 STEEL REINFORCEMENT
A. General: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.

B. Clean reinforcement of loose rust and mill scale , earth, ice, or other bond-reducing materials.

C. Arrange, space, and securely tie bars and bar su pports to hold reinforcement in position during concrete placement. Maintain minimum cover to reinforcement.

D. Install welded wire reinforcement in lengths as long as practicable. Lap adjoining pieces at least one full mesh, and lace splices with wire. Offset laps of adjoining widths to prevent continuous laps in either direction.

3.5 JOINTS
A. General: Form construction, isolation, and cont raction joints and tool edges true to line, with faces perpendicular to surface plane of concrete. Construct transverse joints at right angles to centerline unless otherwise indicated.

1. When joining existing paving, place transverse j oints to align with previously placed joints unless otherwise indicated.

B. Construction Joints: Set construction joints at side and end terminations of paving and at locations where paving operations are stopped fo r more than one-half hour unless paving terminates at isolation joints.

1. Continue steel reinforcement across construction joints unless otherwise indicated. Do not continue reinforcement through s ides of paving strips unless otherwise indicated.

2. Provide tie bars at sides of paving strips where indicated. 716
22-12479 CONCRETE PAVING AND WALKS 321313 - 7 of 12

3. Keyed Joints: Provide preformed keyway-section forms or bulkhead forms with keys as shown on the Drawings.

4. Doweled Joints: Install dowel bars and support assemblies at joints where indicated. Lubricate or coat with asphalt one-half of dowel length to prevent concrete bonding to one side of joint.

C. Isolation Joints: Form isolation joints of pref ormed joint-filler strips where noted on the Drawings.

1. Extend joint fillers full width and depth of joi nt.

2. Terminate joint filler not less than 1/2 inch or more than 1 inch below finished surface if joint sealant is indicated.

3. Place top of joint filler flush with finished co ncrete surface if joint sealant is not indicated.

4. Furnish joint fillers in one-piece lengths. Whe re more than one length is required, lace or clip joint-filler sections together.

5. During concrete placement, protect top edge of j oint filler with metal, plastic, or other temporary preformed cap. Remove protective c ap after concrete has been placed on both sides of joint.

D. Contraction Joints: Form weakened-plane contrac tion joints, sectioning concrete into areas as indicated. Construct contraction joints f or a depth equal to at least one-fourth of the concrete thickness, as follows:

1. Grooved Joints: Form 1/4-inch wide contraction joints after initial floating by grooving and finishing each edge of joint with groo ving tool to a 1/4-inch radius unless noted otherwise on the drawings. Repeat gro oving of contraction joints after applying surface finishes. Eliminate groovin g-tool marks on concrete surfaces.
a. Tolerance: Ensure that grooved joints are withi n 3 inches either way from centers of dowels.

2. Sawed Joints: Sawed joints shall not be used wh ere concrete is permanently exposed to view.
a. Sawed Joints: Form contraction joints with powe r saws equipped with shatterproof abrasive or diamond-rimmed blades. Cu t 1/8-inch- wide joints into concrete when cutting action will not tear, ab rade, or otherwise damage surface and before developing random contraction cracks. 1) Tolerance: Ensure that sawed joints are within 3 inches either way from centers of dowels.

E. Edging: After initial floating, tool edges of p aving, gutters, curbs, and joints in concrete with an edging tool to a 1/4-inch radius unless not ed otherwise on the Drawings.

Repeat tooling of edges after applying surface fini shes. Eliminate edging-tool marks on concrete surfaces.

717
22-12479 CONCRETE PAVING AND WALKS 321313 - 8 of 12

3.6 CONCRETE PLACEMENT
A. Before placing concrete, inspect and complete fo rmwork installation, steel reinforcement, and items to be embedded or cast-in.

B. Remove snow, ice, or frost from subbase surface and steel reinforcement before placing concrete. Do not place concrete on frozen surfaces.

C. Moisten subbase to provide a uniform dampened co ndition at time concrete is placed.

Do not place concrete around manholes or other stru ctures until they are at required finish elevation and alignment.

D. Comply with ACI 301 requirements for measuring, mixing, transporting, and placing concrete.

E. Do not add water to concrete during delivery or at Project site. Do not add water to fresh concrete after testing.

F. Deposit and spread concrete in a continuous oper ation between transverse joints. Do not push or drag concrete into place or use vibrators to move concrete into place.

G. Consolidate concrete according to ACI 301 by mec hanical vibrating equipment supplemented by hand spading, rodding, or tamping.

1. Consolidate concrete along face of forms and adj acent to transverse joints with an internal vibrator. Keep vibrator away from join t assemblies, reinforcement, or side forms. Use only square-faced shovels for hand spreading and consolidation. Consolidate with care to prevent di slocating reinforcement and dowels.

H. Screed paving surface with a straightedge and st rike off.

I. Commence initial floating using bull floats or d arbies to impart an open-textured and uniform surface plane before excess moisture or ble ed water appears on the surface.

Do not further disturb concrete surfaces before beg inning finishing operations or spreading surface treatments.

J. Cold-Weather Placement: Protect concrete work f rom physical damage or reduced strength that could be caused by frost, freezing, o r low temperatures. Comply with ACI 306.1 and the following:

1. When air temperature has fallen to or is expecte d to fall below 40 deg F, uniformly heat water and aggregates before mixing t o obtain a concrete mixture temperature of not less than 50 deg F and not more than 80 deg F at point of placement.

2. Do not use frozen materials or materials contain ing ice or snow.

3. Do not use calcium chloride, salt, or other mate rials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in design mixtures.
718
22-12479 CONCRETE PAVING AND WALKS 321313 - 9 of 12
K. Hot-Weather Placement: Comply with ACI 301 and as follows when hot-weather conditions exist:

1. Cool ingredients before mixing to maintain concr ete temperature below 90 deg F at time of placement. Chilled mixing water or chop ped ice may be used to control temperature, provided water equivalent of ice is calculated in total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option.

2. Cover steel reinforcement with water-soaked burl ap so steel temperature will not exceed ambient air temperature immediately before embedding in concrete.

3. Fog-spray forms, steel reinforcement, and subgra de just before placing concrete.

Keep subgrade moisture uniform without standing water, soft spots, or dry areas.

3.7 CONCRETE FINISHING
A. Float Finish: After initial floating during pla cement, begin the second floating operation when bleed-water sheen has disappeared and concrete surface has stiffened sufficiently to permit operations. Float surface w ith power-driven floats or by hand floating if area is small or inaccessible to power units. Finish surfaces to true planes.

Cut down high spots and fill low spots. Refloat surface immediately to uniform granular texture.

1. Medium-to-Fine-Textured Broom Finish: Draw a so ft-bristle broom across float- finished concrete surface perpendicular to line of traffic to provide a uniform, fine- line texture.

2. Ramps: Finish ramps with medium broom finish wi th direction perpendicular to the direction of travel.

B. Curbs: Provide monolithic finish to interior cu rbs by stripping forms while concrete is still green and by steel-troweling surfaces to a ha rd, dense finish with corners, intersections, and terminations slightly rounded.

3.8 CONCRETE PROTECTION AND CURING
A. General: Protect freshly placed concrete from p remature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold-w eather protection and ACI 305 for hot-weather protection during curing.

B. Evaporation Retarder: Apply evaporation retarde r to concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0. 2 lb/sq. ft. x h before and during finishing operations. Apply according to manufactu rer's written instructions after placing, screeding, and bull floating or darbying concrete but before float finishing.

C. Begin curing after finishing concrete but not be fore free water has disappeared from concrete surface.

D. Curing Methods: Cure concrete by moisture curin g, moisture-retaining-cover curing, curing compound or a combination of these as follows:
719
22-12479 CONCRETE PAVING AND WALKS 321313 - 10 of 1 2

1. Moisture Curing: Keep surfaces continuously moi st for not less than seven days with the following materials:
a. Water.
b. Continuous water-fog spray.
c. Absorptive cover, water saturated and kept conti nuously wet. Cover concrete surfaces and edges with 12-inch lap over a djacent absorptive covers.

2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture- retaining cover, placed in widest practicable width, with sides and ends lapped at least 12 inches and sealed by waterproof tape or ad hesive. Immediately repair any holes or tears occurring during installation or curing period using cover material and waterproof tape.

3. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instruct ions. Recoat areas that have been subjected to heavy rainfall within three hours after initial application.

Maintain continuity of coating, and repair damage during curing period.

3.9 PAVING TOLERANCES
A. Comply with tolerances in ACI 117 and as follows :

1. Elevation: 1/4 inch.

2. Thickness: Plus 3/8 inch, no minus.

3. Surface: Gap below 10-foot- long, unleveled str aightedge not to exceed 1/4 inch

4. Alignment of Tie-Bar End Relative to Line Perpen dicular to Paving Edge: 1/2 inch per 12 inches of tie bar.

5. Lateral Alignment and Spacing of Dowels: 1 inch .

6. Vertical Alignment of Dowels: 1/4 inch.

7. Alignment of Dowel-Bar End Relative to Line Perp endicular to Paving Edge: 1/4 inch per 12 inches of dowel.

8. Joint Spacing: 3 inches.

9. Contraction Joint Depth: Plus 1/4 inch, no minu s.

10. Joint Width for Grooved Joints: Plus 1/8 inch, no minus.

B. Comply with tolerances per CBC Chapter 11B for a ccessible routes for persons with disabilities. Refer to regulatory requirements ref erenced in Part 1 Article “Accessibility Requirements for Pedestrian Paving” of this specification section.

3.10 FIELD QUALITY CONTROL
A. Testing and Inspecting Agency: Owner will engag e and pay for a qualified independent testing and inspecting agency to perfor m tests and inspections as applicable and prepare reports.

1. Testing and Inspection Agency shall be acceptabl e to the Architect and the Division of the State Architect.
720
22-12479 CONCRETE PAVING AND WALKS 321313 - 11 of 1 2
B. The Architect and the Division of the State Arch itect shall have the right to order the testing of any materials used in the concrete construction to determine if they are of the quality specified.

C. Contractor Responsibilities:

1. The Contractor shall maintain control of the qua lity of materials and workmanship in order to conform with the drawings and specifications.

2. To facilitate testing and inspection, the Contra ctor shall:
a. Schedule tests and inspections with the Testing and Inspection Agency sufficiently in advance of operations to allow for the assignment of personnel and for the completion of testing and inspecting responsibilities. b. Provide access to the Work for the designated Te sting and Inspection Agency.
c. Furnish all necessary materials and labor to ass ist the designated Testing and Inspection Agency in obtaining and handling sam ples at the project or other sources of materials.
d. Provide and maintain for the sole use of the Tes ting and Inspection Agency adequate facilities for safe storage and proper cur ing of concrete test specimens on the project site for the first 24 hr. as required by ASTM C31.

3. The Contractor shall correct deficiencies in Wor k that test reports and inspections indicate does not comply with the Contract Documents.

D. Concrete Tests: Testing of composite samples of fresh concrete obtained according to ASTM C 172 shall be performed according to the following requirements:

1. Testing Frequency: Obtain at least one composit e sample for each 5000 sq. ft. or fraction thereof of each concrete mixture placed each day. a. When frequency of testing will provide fewer tha n five compressive- strength tests for each concrete mixture, testing s hall be conducted from at least five randomly selected batches or from each b atch if fewer than five are used.

2. Slump: ASTM C 143/C 143M; one test at point of placement for each composite sample, but not less than one test for each day's p our of each concrete mixture.

Perform additional tests when concrete consistency appears to change.

3. Air Content: ASTM C 231/C 231M, pressure method; one test for each composite sample, but not less than one test for each day's pour of each concrete mixture.

4. Concrete Temperature: ASTM C 1064/C 1064M; one test hourly when air temperature is 40 deg F and below and when it is 80 deg F and above, and one test for each composite sample.

5. Compression Test Specimens: ASTM C 31/C 31M; ca st and laboratory cure one set of three standard cylinder specimens for each composite sample.

6. Compressive-Strength Tests: ASTM C 39/C 39M; te st one specimen at seven days and two specimens at 28 days.
a. A compressive-strength test shall be the average compressive strength from two specimens obtained from same composite sam ple and tested at 28 days.
721
22-12479 CONCRETE PAVING AND WALKS 321313 - 12 of 1 2
E. Strength of each concrete mixture will be satisf actory if the average of any three consecutive compressive-strength tests equals or ex ceeds specified compressive strength and no compressive-strength test value fal ls below specified compressive strength by more than 500 psi.

F. Test results shall be reported in writing to Arc hitect, concrete manufacturer, and Contractor within 48 hours of testing. Reports of compressive-strength tests shall contain Project identification name and number, dat e of concrete placement, name of concrete testing and inspecting agency, location of concrete batch in Work, design compressive strength at 28 days, concrete mixture p roportions and materials, compressive breaking strength, and type of break for both 7- and 28-day tests.

G. Nondestructive Testing: Impact hammer, sonoscop e, or other nondestructive device may be permitted by Architect but will not be used as sole basis for approval or rejection of concrete.

H. Additional Tests: Testing and inspecting agency shall make additional tests of concrete when test results indicate that slump, com pressive strengths, or other requirements have not been met, as directed by Architect.

I. Concrete will be considered defective if it does not pass tests and inspections.

J. Additional testing and inspecting, at Contractor 's expense, will be performed to determine compliance of replaced or additional work with specified requirements.

K. Test and inspection reports are to be prepred an d distributed by the testing agency.

3.11 REPAIRS AND PROTECTION
A. Remove and replace concrete paving that is broke n, damaged, or defective or that does not comply with requirements in this Section. Remove work in complete sections from joint to joint unless otherwise approved by Architect.

B. Additional construction, testing, and replacemen t costs resulting from damaged or improperly installed infrastructure shall be paid for by the Contractor.

C. Drill test cores, where directed by Architect, w hen necessary to determine magnitude of cracks or defective areas. Fill drilled core ho les in satisfactory paving areas with portland cement concrete bonded to paving with epoxy adhesive.

D. Protect concrete paving from damage. Exclude tr affic from paving for at least 14 days after placement. When construction traffic is perm itted, maintain paving as clean as possible by removing surface stains and spillage of materials as they occur.

E. Maintain concrete paving free of stains, discolo ration, dirt, and other foreign material.

Sweep paving not more than two days before date sch eduled for Substantial Completion inspections.

END OF SECTION
722
22-12479 CONCRETE PAVING JOINT SEALANTS 321373 - 1 of 5

SECTION 321373

CONCRETE PAVING JOINT SEALANTS
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specificat ion Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Cold-applied joint sealants.

2. Joint-sealant backer materials.

3. Primers.

B. Related Requirements:

1. Division 07 Section "Joint Sealants" for sealing non-traffic and traffic joints in locations not specified in this Section.

2. Division 32 Section “Concrete Paving and Walks” for improvements to receive joint sealants.

1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference a t Project site.

1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.

B. Paving-Joint-Sealant Schedule: Include the follo wing information:

1. Joint-sealant application, joint location, and d esignation.

2. Joint-sealant manufacturer and product name.

3. Joint-sealant formulation.

4. Joint-sealant color.

1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer.

B. Product Certificates: For each type of joint sea lant and accessory. 723
22-12479 CONCRETE PAVING JOINT SEALANTS 321373 - 2 of 5

1.6 QUALITY ASSURANCE
A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer.

B. Product Testing: Test joint sealants using a qua lified testing agency.

1.7 FIELD CONDITIONS
A. Do not proceed with installation of joint sealan ts under the following conditions:

1. When ambient and substrate temperature condition s are outside limits permitted by joint-sealant manufacturer or are below 40 deg F.

2. When joint substrates are wet.

3. Where joint widths are less than those allowed b y joint-sealant manufacturer for applications indicated.

4. Where contaminants capable of interfering with a dhesion have not yet been removed from joint substrates.

PART 2 - PRODUCTS

2.1 MATERIALS, GENERAL
A. Compatibility: Provide joint sealants, backing m aterials, and other related materials that are compatible with one another and with joint subs trates under conditions of service and application, as demonstrated by joint-sealant m anufacturer, based on testing and field experience.

2.2 COLD-APPLIED JOINT SEALANTS
A. Single Component, Pourable, Urethane, Elastomeri c Joint Sealant: ASTM C 920, Type S, Grade P, Class 25, for Use T.

1. Available Product: W.R. Meadows, Inc.; Pourthan e SL. a. Subject to compliance with requirements, provide product indicated or a comparable product subject to Architect’s approval.

B. Multi-component, Pourable, Urethane, Elastomeric Joint Sealant: ASTM C 920, Type M, Grade P, Class 25, for Use T.

1. Available Product: Pecora Corporation; Urexpan NR-200 or DynaFlex. a. Subject to compliance with requirements, provide product indicated or a comparable product subject to Architect’s approval.

C. Joint-Sealant Application: Joints within concret e paving.

1. Joint Location:
724
22-12479 CONCRETE PAVING JOINT SEALANTS 321373 - 3 of 5

a. Expansion and isolation joints in concrete pavin g.
b. Contraction joints in concrete paving.
c. Other joints as indicated.

D. Joint-Sealant Color: As selected by Architect f rom Manufacturer’s full range.

Manufacturer’s standard color that is closest match to actual substrate color.

2.3 JOINT-SEALANT BACKER MATERIALS
A. Joint-Sealant Backer Materials: Non-staining; co mpatible with joint substrates, sealants, primers, and other joint fillers; and app roved for applications indicated by joint-sealant manufacturer, based on field experience and laboratory testing.

B. Round Backer Rods for Cold-Applied Joint Sealant s: ASTM D 5249, Type 3, of diameter and density required to control joint-seal ant depth and prevent bottom-side adhesion of sealant.

C. Backer Strips for Cold- and Hot-Applied Joint Se alants: ASTM D 5249; Type 2; of thickness and width required to control joint-seala nt depth, prevent bottom-side adhesion of sealant, and fill remainder of joint opening under sealant.

2.4 PRIMERS
A. Primers: Product recommended by joint-sealant ma nufacturer where required for adhesion of sealant to joint substrates indicated.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine joints to receive joint sealants, with I nstaller present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting joint-sealant performance.

B. Proceed with installation only after unsatisfact ory conditions have been corrected.

3.2 PREPARATION
A. Surface Cleaning of Joints: Before installing jo int sealants, clean out joints immediately to comply with joint-sealant manufacturer's written instructions.

1. Remove all foreign material from joint substrate s that could interfere with adhesion of joint sealant, including dust, oil, gre ase, waterproofing, water repellents, water, surface dirt, and frost.

B. Joint Priming: Prime joint substrates where indi cated or where recommended in writing by joint-sealant manufacturer, based on preconstruc tion joint-sealant-substrate tests or 725
22-12479 CONCRETE PAVING JOINT SEALANTS 321373 - 4 of 5

prior experience. Apply primer to comply with joint -sealant manufacturer's written instructions. Confine primers to areas of joint-sea lant bond; do not allow spillage or migration onto adjoining surfaces.

3.3 INSTALLATION OF JOINT SEALANTS
A. Comply with joint-sealant manufacturer's written installation instructions for products and applications indicated unless more stringent requirements apply.

B. Joint-Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions.

C. Install joint-sealant backings to support joint sealants during application and at position required to produce cross-sectional shapes and dept hs of installed sealants relative to joint widths that allow optimum sealant movement capability.

1. Do not leave gaps between ends of joint-sealant backings.

2. Do not stretch, twist, puncture, or tear joint-s ealant backings.

3. Remove absorbent joint-sealant backings that hav e become wet before sealant application and replace them with dry materials.

D. Install joint sealants immediately following bac king installation, using proven techniques that comply with the following:

1. Place joint sealants so they fully contact joint substrates.

2. Completely fill recesses in each joint configura tion.

3. Produce uniform, cross-sectional shapes and dept hs relative to joint widths that allow optimum sealant movement capability.

E. Tooling of Non-sag Joint Sealants: Immediately a fter joint-sealant application and before skinning or curing begins, tool sealants acc ording to the following requirements to form smooth, uniform beads of configuration indi cated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint:

1. Remove excess joint sealant from surfaces adjace nt to joints.

2. Use tooling agents that are approved in writing by joint-sealant manufacturer and that do not discolor sealants or adjacent surfaces.

F. Provide joint configuration to comply with joint -sealant manufacturer's written instructions unless otherwise indicated.

3.4 CLEANING AND PROTECTION
A. Clean off excess joint sealant as the Work progr esses, by methods and with cleaning materials approved in writing by joint-sealant manufacturers.

B. Protect joint sealants, during and after curing period, from contact with contaminating substances and from damage resulting from construct ion operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, 726
22-12479 CONCRETE PAVING JOINT SEALANTS 321373 - 5 of 5

despite such protection, damage or deterioration oc curs, cut out and remove damaged or deteriorated joint sealants immediately and repl ace with joint sealant so installations in repaired areas are indistinguishable from the original work.

END OF SECTION
727

THIS PAGE LEFT BLANK
728
22-12479 PAVING SPECIALTIES 321700 - 1 of 7
SECTION 321700

PAVING SPECIALTIES
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specificat ion Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Pavement-marking.

2. Wheel stops.

3. Tactile warning surfaces.

4. Traffic and pedestrian signage.

B. Related Sections:

1. Division 32 Sections as applicable to asphalt pa ving, concrete paving and concrete walks.

1.3 SUBMITTALS
A. Product Data: For each type of product indicate d. Include technical data and tested physical and performance properties.

A. Shop Drawings: For the following:

1. Pavement Markings: Indicate pavement markings, colors, lane separations, parking spaces, directional arrows, and accessibility markings.

2. Tactile Warning Surfaces: Indicate locations an d extent of tactile warning surfaces.

B. Qualification Data: For installer of tactile wa rning surfaces.

1.4 QUALITY ASSURANCE
A. Installer Qualifications, Tactile Warning Surfac es: Installer shall be certified in writing by the tactile warning surface manufacturer as havi ng successfully completed manufacturer's training for installation of units required for this Project. 729
22-12479 PAVING SPECIALTIES 321700 - 2 of 7
B. Regulatory Requirements: The following shall co mply with requirements of the 2010 ADA Standards for Accessible Design and the 2019 Ca lifornia Building Code, Chapter 11B.

1. Tactile warning surfaces.

2. Pavement markings for disabled access parking st alls and access aisles.

3. Signage for disabled access relating to parking stalls, parking lots, and accessible path of travel to building entrances inc luding vertical clearance below post mounted signs located adjacent to walking surfaces.

1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver pavement-marking materials to Project si te in original packages with seals unbroken and bearing manufacturer's labels containi ng brand name and type of material, date of manufacture, and directions for storage.

B. Store pavement-marking materials in a clean, dry , protected location within temperature range required by manufacturer. Protec t stored materials from direct sunlight.

1.6 PROJECT CONDITIONS
A. Pavement-Marking Paint: Proceed with pavement m arking only on clean, dry surfaces and at a minimum ambient or surface temperature of 55 deg F for water-based materials, and not exceeding 95 deg F.

PART 2 - PRODUCTS

2.1 PAVEMENT MARKING PAINT
A. Manufacturers: Subject to compliance with requi rements, provide products by one of the following:

1. Dunn-Edwards Corporation.

2. Ennis Traffic Safety Solutions.

3. Frazee Paint, Comex Group.

4. The Sherwin-Williams Company
B. Pavement-Marking Paint: Latex, waterborne emuls ion, lead and chromate free, ready mixed, complying with one of the following:

1. FS TT-P-1952, Type II, with drying time of less than 45 minutes.

2. MPI #97 Latex Traffic Marking Paint.

C. Colors Unless otherwise indicated, provide colo rs as follows:

1. White:
730
22-12479 PAVING SPECIALTIES 321700 - 3 of 7
a. Parking stall lines and text markings.
b. Figure and border of international symbol of acc essibility (ISA) markings at accessible parking stalls.
c. Diagonal striping for accessible parking stall a ccess aisles where marked on asphalt paving.
d. Traffic arrows.
e. Stencil-lettering on fire lane curbs.

2. Blue: Color equal to Color 15090 per Federal St andard 595B. a. Background of international symbol of accessibil ity (ISA) markings at accessible parking stalls.
b. Perimeter of accessible parking stall access ais les. c. Diagonal striping for accessible parking stall a ccess aisles where marked on concrete paving.

3. Red: Curbs of fire lanes, face and top of curb.

2.2 TACTILE WARNING SURFACES
A. Basis of Design: Drawings and Specifications ar e based on the following:

1. ADA Solutions, Inc.
a. Replaceable Wet-Set detectable warning tile pane ls.

2. Subject to compliance with requirements, provide product indicated or a comparable product subject to request for substitution.

B. Description: Homogeneous fiberglass and carbon reinforced composite panels with ADA and CBC compliant truncated dome pattern on exp osed surfaces, panels are colorfast and UV stable with uniform color throughout the thickness of the panel.

1. Replaceable Wet-Set Detectable Warning Tile Pane ls: Tile panels designed for setting in freshly poured concrete and mechanically anchored with stainless steel fasteners.

2. Standard Sizes: 24 by 36, 48, and 60 inches; 36 by 36 and 60 inches.

3. Thickness:
a. Wet-Set Tiles: 1/4 inch nominal thickness with a 3/4 inch thick by 1 inch wide perimeter flange.

4. Physical Characteristics:
a. Compressive Strength: 28,900 psi, ASTM D695.
b. Slip Resistance: 1.18 dry, 1.05 wet, ASTM C 102 8.
c. Flame Spread Index: Less than 25, ASTM E 84.
d. Freeze/Thaw/Heat: No disintegration, ASTM C 102 6.

5. Tactile Surface Domes (Regulatory Requirements p er 2019 CBC 11B-705):
a. Dome Size:
731
22-12479 PAVING SPECIALTIES 321700 - 4 of 7
1) Base Diameter: 0.90 inches minimum, 0.92 inches maximum. 2) Top Diameter: 0.45 inches minimum, 0.47 inches maximum. 3) Height: 0.2 inches.
b. Dome Configuration and Spacing: Square grid, 2. 3 inches minimum, 2.4 inches maximum, center to center spacing. Base edg e to base edge spacing of 0.65 inch minimum measured to the most a djacent domes on a square grid.

6. Color: Federal yellow, equal to SAE AMS-STD 595 A (Formerly color 33538 per Federal Standard 595C).

C. Accessory Materials: Accessory materials shall be recommended in writing by the tactile surface panel manufacturer.

1. Fasteners for Wet-Set Tile: Manufacturer’s stan dard stainless steel inserts and matching bolts, 1/2 inch diameter, factory attached to tile panels.

2.3 WHEEL STOPS
A. Wheel Stops: Precast, air-entrained concrete, 2 ,500-psi minimum compressive strength, 6 inches high by 6 inches wide by 48 inch es long, and reinforced with (4) #3 reinforcing bars. Provide chamfered corners and holes for anchoring to substrate.

B. Dowels: Galvanized steel, 1/2 inch diameter, 10 -inch minimum length.

2.4 TRAFFIC AND PEDESTRIAN SIGNAGE
A. Traffic Signs: Provide traffic signs as indicat ed on Drawings complying with the following requirements:

1. Material: Aluminum sheet, ASTM B 209, alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated, and with at least the strength and durability properties of All oy 5005-H32, 0.080 inch minimum thickness.

2. Corner Condition: Rounded to radius of 1-1/2 in ches unless otherwise indicated.

3. Finish: Manufacturer’s standard powder coat or baked enamel reflectorized finish.

4. Size: As indicated on Drawings.

5. Color: As indicated on Drawings.

6. Text and Graphics: As indicated on Drawings.

B. Brackets: Extruded aluminum brackets and fittin gs to suit sign construction and mounting conditions for bracket-mounted signs.

C. Fasteners: Non-corrosive fasteners compatible w ith sign and post materials; provide fasteners with vandal/theft resistant heads.

D. Sign Posts: Galvanized steel pipe, ASTM A53, st andard weight, Schedule 40, size as indicated on Drawings.
732
22-12479 PAVING SPECIALTIES 321700 - 5 of 7
E. Concrete for Sign Posts: Ready mixed concrete o r prepackaged concrete mix for site mixing requiring only the addition of water at the project site; minimum 2000 psi compressive strength at 28 days.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine conditions in which products are to be a pplied or installed with installer/applicator present.

B. Proceed with only after unsatisfactory condition s have been corrected.

3.2 PAVEMENT MARKING APPLICATION
A. Preparation:

1. Do not apply pavement-marking paint until layout , colors, and placement have been verified with Architect.

2. Allow paving to age for time period recommended by paint manufacturer, but not less than 30 days before starting pavement marking.

3. Test concrete paving for alkalinity, pH level sh all be less than the maximum value recommended by paint manufacturer.

4. Sweep and clean surface to eliminate loose mater ial and dust. Surfaces shall be clean, dry, and free of oil, grease, and other foreign matter.

B. Apply paint with mechanical equipment to produce pavement markings, of dimensions indicated, with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils.

1. Width of Lines: 4 inches unless otherwise indic ated on Drawings.

2. Graphics and Lettering: Apply graphic symbols a nd lettering with paint-resistant, die-cut stencils, firmly secured to concrete surfac e. Mask an extended area beyond edges of each stencil to prevent paint appli cation beyond stencil. Apply paint so that it cannot run beneath stencil.

C. Prohibit traffic until traffic paint is fully dr y.

3.3 WHEEL STOP INSTALLATION
A. Accurately locate and align wheel stops as indic ated on Drawings. Where wheel stops are installed parallel to curbs or paving edge, whe el stops shall be aligned in a straight line.

B. Securely attach wheel stops to pavement with not less than two galvanized-steel dowels embedded at one-quarter to one-third points. Securely install dowels into pavement and bond to wheel stop. Recess head of do wels beneath top of wheel stop and grout holes.
733
22-12479 PAVING SPECIALTIES 321700 - 6 of 7

3.4 TACTILE WARNING SURFACE INSTALLATION
A. General: Install tactile warning surface tile p anels in accordance with manufacturer’s written installation instructions.

B. Wet-Set Tile Panels: Accurately place tile pane l in position in freshly finished concrete, tamp unit using a rubber mallet and a block of wood , continue tamping until all air has been released and the surface of the tile panel is flush with the surrounding concrete surface. Provide 1/8 inch space between adjacent p anels of multiple panel installations.

1. Concrete shall have a smooth trowel finish prior to placement of tile panel(s).

2. After installation of tile panel, finish concret e around perimeter of panel with a 1/4 inch edge trowel.

3. When no further panel adjustment is needed, appl y weight to panel until the concrete is set. Protect panels from traffic until concrete is cured.

4. Remove protective film from panel after concrete has cured.

3.5 SIGNAGE INSTALLATION
A. Sign Post Installation:

1. Post Excavation and Footings: Drill or hand-exc avate holes for posts to diameters and depths indicated in firm, undisturbed soil; if footing diameters and depths are not indicated on Drawings, footings shal l be not less than 10 inches diameter by 30 inches deep; tops of footings shall be established as 4 inches below finish grade.

2. Post Setting: Verify that posts are set plumb, aligned, and at correct height; hold in position during setting with concrete or mechani cal devices; the bottom of posts shall be 3 inches above the bottom of footing s. Place concrete around posts and vibrate or tamp for consolidation. Prote ct aboveground portion of posts from concrete splatter.
a. Posts in Paved Areas Installed Prior to Paving: Comply with the following:
1) Posts in Concrete Paved Areas and Curbs: Coordi nate top of paving elevation and pour concrete fill to approximately 6 inches below finish grade.
2) Posts in Asphalt Concrete Paved areas: Concrete fill to be flush with adjacent paving and crowned to shed water away from posts.

Coordinate top of paving elevation and form top 6 i nches of footing with round concrete form of diameter matching post footing; pour concrete fill prior to paving operations.
b. Posts in Unpaved Areas: Concrete fill to be 2 i nches above finish grade and crowned to shed water away from posts. Coordin ate finish grade elevation and form top 6 inches of footing with rou nd concrete form of diameter matching post footing.

B. Sign Installation: Attach signs to posts with a ppropriate brackets and theft resistant fasteners.
734
22-12479 PAVING SPECIALTIES 321700 - 7 of 7

1. The bottom of signs shall be at least 80 inches above walking surfaces when located adjacent to pedestrian paths of travel.

2. Peen ends of exposed threads to prevent removal of fasteners.

3. Where signs are indicated to be fastened to buil dings or fences, install as indicated on Drawings.

END OF SECTION
735
22-12479 WATER DISTRIBUTION 331000 – 1 of 6
SECTION 331000

WATER DISTRIBUTION
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Pipe and fittings for water piping.

2. Valves.

3. Valve boxes.

4. Accessories.

B. Related Sections:

1. Division 31 Section “Trenching.”

1.3 REFERENCES
A. ASTM Test Method D1557.

B. ANSI/ASTM D2466 - Polyvinyl Chloride (PVC) Plast ic Pipe Fittings, Schedule 40.

C. ANSI/AWWA C110 - Ductile Iron and Grey-Iron Fitt ings, 3 inch through 48 inch, for Water and Other Liquids.

D. ANSI/AWWA C151 - Ductile-Iron Pipe, Centrifugall y Cast in Metal Molds or Sand-Lined Molds, for Water or Other Liquids.

E. ANSI/AWWA C500 - Gate Valves, 3 through 48 in NP S, for Water and Sewage Systems.

F. ANSI/AWWA C900 - Standard for Polyvinyl Chloride (PVC) Pressure Pipe, 4 inch through 12 inch, for Water.

G. ASTM D1785 - Polyvinyl Chloride (PVC) Plastic Pi pe, Schedules 40, 80, and Class 200.

H. ASTM D2855 - Making Solvent-Cemented Joints with Polyvinyl Chloride (PVC) Pipe and Fittings.

I. ASTM D3139 - Joints for Plastic Pressure Pipes u sing Flexible Elastomeric Seals. 736
22-12479 WATER DISTRIBUTION 331000 – 2 of 6

1.4 SUBMITTALS
A. Product Data: Provide data on pipe materials, p ipe fittings, valves and accessories.

B. Manufacturer's Certificate: Certify that produc ts meet or exceed specified requirements.

C. Project Record Documents: Submit under provisio ns of Division 01.

1. Accurately record actual locations of piping mai ns, valves, connections, and appurtenances.

2. Identify and describe discovery of uncharted uti lities, or utilities found at locations different than indicated on plans.

1.5 QUALITY ASSURANCE
A. Perform work in accordance with product manufact urer's recommendations and these Contract Documents.

B. Valves: Manufacturer's name and pressure rating marked on valve body.

1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, protect and handle all products required.

PART 2 - PRODUCTS

2.1 PIPE MATERIALS
A. Ductile Iron Pipe (for iron pipe larger than 3 i nches in diameter, above ground):

ANSI/AWWA C150/A21.50 and ANSI/AWWA C151/A21.51, th ickness Class 50, with cement - mortar lining and seal coating per ANSI/AW WA C104/A21.4.

1. Fittings: ANSI/AWWA C110/A21.10, ductile iron.

2. Joints: Flanged.

B. PVC Pipe (for pipe 3" and smaller, underground): ASTM D1785, Schedule 40; 1120 high impact.

1. Fittings: ANSI/ASTM D2464, Schedule 80 PVC (Sch edule 40 PVC for pipes 1 ½ inches and smaller).

2. Joints: ASTM D2855, solvent weld.

C. PVC Pipe (for pipe 4" and larger, underground): ANSI/AWWA C900 Class 200, 1120 high impact.

1. Fittings: ANSI/AWWA C111, cast iron.
737
22-12479 WATER DISTRIBUTION 331000 – 3 of 6

2. Joints: ASTM D3139 compression gasket ring.

2.2 VALVES
A. General: Brass or Bronze body, non-rising stem, inside screw, single wedge or disc, IPS ends.

B. Valves Up to 2 inches: Full port ball valves.

C. Valves 2-1/2 inches and Larger: Gate valves, AN SI/AWWA C500, Iron body, bronze trim, non-rising stem with square nut or control ha ndle wheel, resilient single wedge, threaded or flanged.

2.3 VALVE BOXES
A. Valve Boxes and Covers: Precast reinforced conc rete with cast iron lid marked for service, Christy No. G5 traffic box or approved equal. Cover marking shall read "Water".

1. A one-piece PVC riser extension shall be provide d as necessary to allow unobstructed access to valve operating nut.

2.4 ACCESSORIES
A. Concrete for Thrust Blocks and Valve Box Surface Collars: Concrete type specified in Division 03 Section “Cast-in-Place Concrete”.

B. Concrete pad and guard post for the fire hydrant shall be as per detail drawing.

C. Solvent Cement and Primer for PVC Pipe and Fitti ngs: Per ASTM F656 and ASTM D2564.

D. Construct blow-off assembly as indicated on Draw ings.

E. Furnish and install reduced pressure backflow pr eventors as indicated on Drawings.

F. Furnish and install fire main and appurtenances as indicated on Drawings and per the governing Fire Department Standards.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Verify existing conditions. All plot dimensions are approximate. Before proceeding with any work, carefully check and verify all dimensions and report any variations to the Inspector.
738
22-12479 WATER DISTRIBUTION 331000 – 4 of 6
B. Due to the scale of the drawings, it is not poss ible to indicate all offsets, fittings, etc., which may be required. Carefully investigate the structural and finished conditions affecting all work, and plan work accordingly, furnishing such fittings, etc., as may be required to meet such conditions. Drawings are generally diagrammat ic and indicative of the work to be installed in the most direct and workmanlike manner , so that conflicts between water systems, planting, and architectural features will be minimized.

C. Do not install the facilities as indicated on th e drawings when it is obvious in the field that unknown obstructions might not have been considered in the engineering. Such obstructions or differences should be brought to th e attention of the Architect.

3.2 PREPARATION
A. Prepare for pipe installation by assembling all needed materials.

B. Cover all PVC pipe during storage.

3.3 TRENCHING
A. Trenching shall be in accordance with Division 3 1 Section “Trenching.”

3.4 BEDDING
A. Per the pipe manufacturer recommendations, City of Merced, and Merced County Standards and Specifications.

B. Where trench or pit has been overexcavated, plac e bedding material at bottom of excavations, level soil materials in continuous layers not exceeding 6 inches uncompacted depth.

C. Backfill around sides and to a level six inches above the top of pipe with bedding sand, tamped in place.

D. Maintain optimum moisture content of bedding mat erial to attain required compaction density.

3.5 INSTALLATION, PIPE AND FITTINGS
A. Install pipe at locations and depths indicated o n Drawings.

B. Install pipe, fittings, and associated materials in accordance with manufacturer’s written recommendations.

C. Route pipe in straight line, whenever possible. All changes in direction of pipes shall be made with fittings, not by bending.

D. Install pipe to allow for expansion and contract ion without stressing pipe or joints. 739
22-12479 WATER DISTRIBUTION 331000 – 5 of 6
E. Form and place concrete for thrust blocks at eac h elbow, tee, angle or other significant change of direction in loose-joint pipe as indicate d on Drawings. Establish elevations of buried piping to ensure not less than 24 inches of cover, except at connections to existing lines, which may be shallower or deeper, or where s hown otherwise on Drawings.

F. When two water pipes are to be installed in same trench, maintain 4-inch horizontal clearance between pipes.

G. Backfill trench or other excavation in accordanc e with Division 31 Section “Trenching and Backfilling”.

3.6 INSTALLATION, VALVES
A. Set valves on solid bearing.

B. Where valves are installed below finish surface grade, center and plumb valve box and any necessary extensions over valve. Set box cover flush with finished grade.

C. Pour concrete collar around top of valve box as indicated on Drawings.

D. Furnish and install valves and valve boxes in ad dition to those shown on plans as required for isolation of lines for construction and disinfection, while minimizing disruption of service to buildings, at no additional cost to Owner.

3.7 INSTALLATION, THREADED CONNECTIONS
A. Assemble all plastic and galvanized steel thread ed pipe and fittings using an approved Teflon tape applied to the male threads only. A minimum of two (2) wraps and a maximum of three (3) wraps of an approved Teflon tape will be required.

B. At all plastic (PVC) pipe connections, work the ductile iron connections first. Connections shall always be plastic into steel, never steel int o plastic.

C. A non-hardening sealant and lubricant similar to Permatex #51 or LASCO blue pipe sealant may be used in lieu of Teflon tape. Apply sealant to clean male threads brushing into grooves and to the first three threads of the female threads.

3.8 DISINFECTION OF DOMESTIC WATER PIPING SYSTEM
A. Disinfect all domestic water piping systems in a ccordance with AWWA Standard C601, "AWWA Standard for Disinfecting Water Mains", and i n accordance with administrative authority. Disinfection process shall be performed in cooperation with health department having jurisdiction and witnessed by a representative of the Architect. During procedure signs shall be posted at each water outlet stating, "Chlorination - Do No Drink". After disinfection, water samples shall be collected for bacteriological analysis. Certificate of Bacteriological Purity shall be obtained and delivered to the Owner through the Architect.

B. Additional disinfection requirements per the aut horities having jurisdiction may exist.

Contractor shall review City standards and specifications and coordinate with appropriate 740
22-12479 WATER DISTRIBUTION 331000 – 6 of 6
agency.

3.9 FIELD QUALITY CONTROL
A. Follow City of Merced standards for additional t esting specifications.

B. Test completed piping systems according to requi rements of authorities having jurisdiction.

1. Do not enclose, cover, or put into service befor e inspection and approval.

C. Field inspection will be performed under provisi ons of Division 01 General Requirements Sections.

D. Compaction testing will be performed in accordan ce with ASTM Test Method D1557.

E. If compaction tests indicate Work does not meet specified requirements, recompact and retest at no additional cost to Owner.

F. If tests indicate that Work does not meet specif ied requirements, remove work, replace and retest at no additional cost to Owner.

END OF SECTION
741

EXHIBIT “C” – SPECIAL CONDITIONS

ARTICLE 1 BONDS
Within ten (10) calendar days from the date the Contractor is notified of award of the Contract, the Contractor shall deliver to the City four identical counterparts of the Performance Bond and Payment Bond on the forms supplied by the City and included as Exhibit “F” to the Contract. Failure to do so may, in the sole discretion of City, result in the forfeiture of Contractor’s bid security. The surety supplying the bond must be an admitted surety insur er, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the City. The Performance Bond and the Payment Bond shall be for one hundred percent (100%) of the Total Contract Price.

742
743
744

EXHIBIT “F” – PAYMENT AND PERFORMANCE
BONDS

745

PERFORMANCE BOND

KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the City of Merced (hereinafter refe rred to as “City”) has awarded to ____________________, (hereinafter referred to as t he “Contractor”) _______________________ an agreement for __________ ____________________ (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contracto r is more particularly set forth in the Contract Documents for the Project dated ______ __________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contra ct Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, _______________, the undersig ned Contractor and _____________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of _________________ __________ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assign s, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, s hall in all things stand to and abide by, and well and truly keep and perform the covenants, cond itions and agreements in the Contract Documents and any alteration thereof made as therei n provided, on its part, to be kept and performed at the time and in the manner therein spe cified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its officers and agents, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a condition precedent to the satisfactory compl etion of the Contract Documents, unless otherwise provided for in the Contract Documents, t he above obligation shall hold good for a period of one (1) year after the acceptance of the work by City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused b y defective materials or faulty workmanship, Surety shall undertake and faithfully fulfill all s uch obligations. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety ’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure section 337.15.

Whenever Contractor shall be, and is declared by t he City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:
746

(1) Take over and complete the Project in accordanc e with all terms and conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon deter mination by Surety of the lowest responsive and responsible bidder, arrange f or a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this par agraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the Cit y to the Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the City to complete the Project in any manner consistent with local, California and federal law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this par agraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the Cit y to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the City may reject a ny contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contract or’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Co ntract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alter ation or addition to the terms of the Contract Documents or to the Project, including but not limited to the provisions of sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__).
(Corporate Seal)
Contractor/ Principal
By

Title

747

(Corporate Seal) Surety
By
Attorney-in-Fact
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached.
(Attach Attorney-in-Fact Certificate) Title

The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ______________________ _____________________ ___________________________________________
___________________________________________

(Name and Address of Agent or _____________________ ______________________ Representative for service of
process in California, if different _______________ ____________________________ from above)
___________________________________________
(Telephone number of Surety and ___________________ ________________________ Agent or Representative for service
of process in California)

NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

748

Notary Acknowledgment
A notary public or other officer completing this certifica te verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, __________________________ _____, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are s ubscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/th eir authorized capacity(ies), and that by his/her/t heir signature(s) on the instrument the person(s), or th e entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws o f the State of California that the foregoing paragr aph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law , it may prove valuable to persons relying on the d ocument and could prevent fraudulent removal and reattachme nt of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer

Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney -In -Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

749

Notary Acknowledgment
A notary public or other officer completing this certifica te verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, __________________________ _____, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are s ubscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/th eir authorized capacity(ies), and that by his/her/t heir signature(s) on the instrument the person(s), or th e entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws o f the State of California that the foregoing paragr aph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law , it may prove valuable to persons relying on the d ocument and could prevent fraudulent removal and reattachme nt of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer

Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney -In -Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

750

PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS That

WHEREAS, the City of Merced (hereinafter designate d as the “City”), by action taken or a resolution passed ___________ , 20____has awarded to ________________ hereinafter designated as the “Principal,” a contract for the work described as follows:
_____________________________________________________ (the “Project”); and WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract Documents for the Project dated __________ ________ (“Contract Documents”), the terms and conditions of which are expressly incorporated by reference; and WHEREAS, said Principal is required to furnish a b ond in connection with said contract; providing that if said Principal or any of its Subc ontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code o r for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and _____________ _____________ as Surety, are held and firmly bound unto the City in the penal sum of ______________ Dollars ($___________) lawful money of the Unit ed States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if s aid Principal, his or its subcontractors, heirs, executors, administrators, s uccessors or assigns, shall fail to pay any of the persons named in Section 9100 of the Civil Code , fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amoun ts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contra ctor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified.

This bond shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Suret y on this bond shall not be exonerated or released from the obligation of this bond by any ch ange, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension o f the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or 751

attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the righ t of recovery of claimants otherwise entitled to recover under any such contract or agreement or und er the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in s uch bond, but the sole conditions of recovery shall be that claimant is a person described in Sec tion 9100 of the Civil Code, and has not been paid the full amount of his claim and that Surety d oes hereby waive notice of any such change, extension of time, addition, alteration or modifica tion herein mentioned and the provisions of sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
By

Title

(Corporate Seal) Surety
By
Attorney-in-Fact
Title

Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. A Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

752

Notary Acknowledgment
A notary public or other officer completing this certifica te verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, __________________________ _____, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are s ubscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/th eir authorized capacity(ies), and that by his/her/t heir signature(s) on the instrument the person(s), or th e entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws o f the State of California that the foregoing paragr aph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law , it may prove valuable to persons relying on the d ocument and could prevent fraudulent removal and reattachme nt of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer

Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney -In -Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

753

Notary Acknowledgment
A notary public or other officer completing this certifica te verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, __________________________ _____, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are s ubscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/th eir authorized capacity(ies), and that by his/her/t heir signature(s) on the instrument the person(s), or th e entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws o f the State of California that the foregoing paragr aph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law , it may prove valuable to persons relying on the d ocument and could prevent fraudulent removal and reattachme nt of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer

Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney -In -Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

754

APPENDIX

755

CITY OF MERCED STANDARD DESIGNS

THE FOLLOWING STANDARDS ARE FOR REFERENCE ONLY

REFER TO THE CITY OF MERCED WEBSITE FOR THE COMPLETE LISTING OF

STANDARD DETAILS

http://www.cityofmerced.org/depts/engineering_division/standard_designs/default.asp

756

STATE GENERAL PREVAILING WAGE RATES

General prevailing wage determination
Made by the Director of Industrial Relations
Pursuant to California Labor Code part 7,
Chapter 1, article 2, sections 1770, 1773, and 1773.1
__________________________________________________
State of California Department of Industrial Relations Website:
http://www.dir.ca.gov/OPRL/PWD/index.htm
757

LOCATION MAP

758

REGULATION VIII – FUGITIVE PM10 PROHIBITIONS
759

760

761

762