Attachment 1
Bid Opening: 11/21/2024 2:00 pm American Paving Co. Cal Valley Constructon Pavement Coatings Co. (Fresno, CA) (Fresno, CA) (Sacramento, CA)
UNIT OF ESTIMATED UNIT ITEM UNIT ITEM UNIT ITEM
NO. ITEM MEASURE QUANTITY PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 Traffic Control System 208,900.00 $ 208,900.00 S 319,000.00 $ 319,000.00 $ 245,500.00 $ 245,500.00 2 Traffic Signal Modification 106,000.00 $ 106,000.00 $ 105,267.00 5 105,267.00 s 150,086.95 $ 150,086.95 3 Remove Existing Pavement Markings 4986 4.00 | $ 19,944.00 $ 4.00 5 19,944.00 S 5.33 $ 26,575.38 Remove Existing Curb Paint 1485 10.00 $ 14,850.00 S 10.00 S 14,850.00 $ 13.33 $ 19,795.05 5 Remove Existing Striping 6005 1.50 $ 9,007.50 $ 1.50 $ 9,007.50 S 2.00 $ 12,010.00 .... 16,210.805
6 Remove Type AY Non-Reflective Markers 13,509 1.20$ 16,210.805 1.20 $ 1.60 $ 21,614.40 7 Remove Existing Signs 125.00 $ 8,000.00 $ 125.00 S 8,000.00 $ 150.00 $ 9,600.00 8 Remove Existing Sign Posts EA 175.00 $ 4,025.00 $ 425.00 $ 9,775.00 $ 150.00 $ 3,450.00 9 Remove Type 9 Pole with Mast Arm and Foundation EA 8,500.00 $ 8,500.00 8,500.00 $ 8,500.00 S 10,000.00 $ 10,000.00 10 Remove Delineator Post EA 130.00 $ 1,170.00 150.00 s 1,350.00 $ 150.00 $ 1,350.00 11 Relocate Existing Sign EA 70.00 S 1,260.00 S 70.00 s 1,260.00 $ 93.33 $ 1,679.94| 12 Relocate Existing Sign Post EA 150.00 $ 1,350.00 $ 150.00 $ 1,350.00 S 200.00 $ 1,800.00 13 Install Sign EA 120.00 S 11,760.00 S 120.00 s 11,760.00 $ 160.00 $ 15,680.00 14 Install Sign Post EA 240.00 $ 11,520.00 S 240.00 $ 11,520.00 5 320.00 $ 15,360.00 15 Install Delineator Posts EA 120.00 s 2,280.00 $ 120.00 S 2,280.00 5 160.00 5 3,040.00 16 Place Detail 9 2.00 140.00 2.00 s 140.00 $ 2.24 5 156.80 17 Place Detail 22 5.50 8,404.50 6.50 $ 8,404.50 $ 7.27 S 9,400.11 18 Place Detail 23 25.00 $ 1,250.00 $ 27.95| $ 1,397.50 19 Place Detail 29 1,521. 9.00 $ 1,521.00 $ 10.06| $ 1,700.14 20 Place Detail 32 2.504 8.00 $ 20,032.00 $ 8.94 $ 22,385.76 21 Place Detail 38 740 2,960. 4.00 $ 2,960.00 $ 4.47 $ 3,307.80 22 Place Detail 39 3.529 5,293. 1.60 $ 5,646.40 $ 1.79|$ 6,316.91 23 Place Detail 39A 640.00 1.60 S 640.00 $ 1.79 $ 716.00 24 Place 4" White Stripe 7,342 16.152,40 2.20 $ 16,152.40 $ 2.46 $ 18,061.32 25 Place 4" Blue Stripe 616 4,928.00 8.00 $ 4,928.00 $ 8.94 $ 5,507.04 26 Place 12" White Stripe 1,346 8,076.00 6.00 s 8,076.00 $ 6.71 $ 9,031.66 27 Paint Red Curb 2,267 4,080.60 1.80 S 4,080.60$ 2.01 $ 4,556.67 28 Paint Green Curb 1.80 511.20 1.80 | $ / 511.205 2.01 $ 570.84 29 Paint Blue Curb 1.80 529.20 1.80 $ 529.20 $ 2.01$ 590.94 30 Type 1 Arrow 2,604.00 14.00 S 2,604.00 $ 15.65S 2,910.90 31 Type IV Arrow 7,350.00 7,350.00 $ 15.65 $ 8,216.25
32 Type VII Arrow 14.00 5,670.00 5,670.00$ 15.65 s 6,338.25 33 Bike Lane Loop Symbol 1,400.00 14.00 $ 1,400.00 | $ 15.65 S 1,565.00 34 Bike Lane Marking 8 8 980.00 14.00 S 980.00 s 15.65 S 1,095.50 "NO PARKING" Marking 336.00 336.00 s 15.65 $ 375.60
36 "STOP" Marking 2,464.00 2,464.00 S 15.65$ 2,754.40
37 "ONLY" Marking 8 308.00 14.00 $ 308.00 | 5 15.65 $ 344.30 38 ADA Marking 5,244.00 19.00$ 5,244.00 5 21.24$ 5,862.24 39 Bike Sharrow 3,872.00 16.00 S 3,872.00 S 17.89 S 4,329.38 40 Type II Slurry Seal 110,880.00 420.00 5 110,880.00 S 261.76 $ 69,104.64 41 Type III Slurry Seal with Fiber Reinforcement 525.00 138,600.00 138,600.00 | $ 575.00 $ 151,800.00 42 Dig-out and Replace AC Pavement 24.50 153,713.00 188,220.00 S 35.25 $ 221,158.50 43 Remove and Replace Curb and Gutter 352.00 33,088.00 250.005 23,500.00 $ 560.00 $ 52,640.00 Total: | 965,804.70 $ 1,106,373.60 $ 1,149,736.17