CONSTRUCTION CONTRACT

MAIN STREET DIRECTIONAL – PROJECT NO. CP230014

1. Parties and Date.

This Contract is made and entered into this ________________ day of ___________, ____________ by and between the City of Merced, a California Charter Municipal Corporation of the State of California (“City”) and American Paving Company, a California Corporationwith its principal place of business at 525 W. Alluvial Ave, Fresno, CA 93711 (“Contractor”). City and Contractor are sometimes individually referred to as “Party” and collectively as “Parties” in this Contract.

2. Recitals.

2.1 City. City is a California Charter Municipal Corporation organized under the laws of the State of California, with power to contract for services necessary to achieve its purpose.

2.2 Contractor. Contractor desires to perform and assume responsibility for the provision of certain construction services required by the City on the terms and conditions set forth in this Contract. Contractor represents that it is duly licensed and experienced in providing services such as repairs of street pavement, curb, and gutter, removal of existing stripping, slurry seal of pavement, re-stripping of pavement, and removal of traffic signal devices. The following license classifications are required for this Project: Class A or C

2.3 Project. City desires to engage Contractor to render such services for the MAIN STREET DIRECTIONAL – Project No. CP230014 as set forth in this Contract.

2.4 Project Documents & Certifications . Contractor has obtained, and delivers concurrently herewith, a performance bond, a payment bond, and all insurance documentation, as required by the Contract.

3. Terms

3.1 Incorporation of Documents. This Contract includes and hereby incorporates in full by reference the following documents, including all exhibits, drawings, specifications and documents therein, and attachments and addenda thereto:

• Services/Schedule (Exhibit “A”)
• Plans and Specifications (Exhibit “B”)
• Special Conditions (Exhibit “C”)
• Contractor’s Certificate Regarding Workers’ Compensation (Exhibit “D”) • Public Works Contractor Registration Certification (Exhibit “E”) • Payment and Performance Bonds (Exhibit “F”)
• Addenda
• Change Orders executed by the City
• Latest Edition of the Standard Specifications for Public Works Construction (Green Book), Excluding Sections 1-9
1 Attachment 3

• Notice Inviting Bids, if any
• Instructions to Bidders, if any
• Contractor’s Bid

3.2 Contractor’s Basic Obligation; Scope of Work. Contractor promises and agrees, at its own cost and expense, to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately complete the Project, including all structures and facilities necessary for the Project or described in the Contract (hereinafter sometimes referred to as the “Work”), for a Total Contract Price as specified pursuant to this Contract. All Work shall be subject to, and performed in accordance with the above referenced documents, as well as the exhibits attached hereto and incorporated herein by reference.

The plans and specifications for the Work are further described in Exhibit “B” attached hereto and incorporated herein by this reference. Special Conditions, if any, relating to the Work are described in Exhibit “C” attached hereto and incorporated herein by this reference.

3.2.1 Change in Scope of Work . Any change in the scope of the Work, method of performance, nature of materials or price thereof, or any other matter materially affecting the performance or nature of the Work shall not be paid for or accepted unless such change, addition or deletion is approved in writing by a valid change order executed by the City. Shoul d Contractor request a change order due to unforeseen circumstances affecting the performance of the Work, such request shall be made within five (5) business days of the date such circumstances are discovered or shall waive its right to request a change order due to such circumstances. If the Parties cannot agree on any change in price required by such change in the Work, the City may direct the Contractor to proceed with the performance of the change on a time and materials basis.

3.2.2 Substitutions/“Or Equal”. Pursuant to Public Contract Code Section 3400(b), the City may make a finding that designates certain products, things, or services by specific brand or trade name.

Unless specifically designated in this Contract, whenever any material, process , or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such Specifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desired and shall be deemed to be followed by the words “or equal.”

Contractor may, unless otherwise stated, offer for substitution any material, process or article which shall be substantially equal or better in every respect to that so indicated or specified in this Contract.

However, the City may have adopted certain uniform standards for certain materials, processes and articles.

Contractor shall submit requests, together with substantiating data, for substitution of any “or equal” material, process or article no later than thirty-five (35) days after award of the Contract. To facilitate the construction schedule and sequencing, some requests may need to be submitted before thirty-five (35) days after award of Contract. Provisions regarding submission of “or equal” requests shall not in any way authorize an extension of time for performance of this Contract. If a proposed “or equal” substitution request is rejected, Contractor shall be responsible for providing the specified material, process or article. The burden of proof as to the equality of any material, process or article shall rest with Contractor.

The City has the complete and sole discretion to determine if a material, process or article is an “or equal” material, process or article that may be substitute d. Data required to substantiate requests for substitutions of an “or equal” material, process or article data shall include a signed affidavit from Contractor stating that, and describing how, the substituted “or equal” material, process or article is eq uivalent to that specified in every way except as listed on the affidavit. Substantiating data shall include any and all illustrations, specifications, and other relevant data including catalog information which describes the requested substituted “or equal” material, process or article, and substantiates that it is an “or equal” to the material, process or article.

The substantiating data must also include information regarding the durability and lifecycle cost of the requested 2 substituted “or equal” material, process or article. Failure to submit all the required substantiating data, including the signed affidavit, to the City in a timely fashion will result in the rejection of the proposed substitution.

Contractor shall bear all of the City’s costs associated with the review of substitution requests.

Contractor shall be responsible for all costs related to a substituted “or equal” material, process or article.

Contractor is directed to the Special Conditions (if any) to review any findings made pursuant to Public Contract Code section 3400.

3.3 Period of Performance and Liquidated Damages . Contractor shall perform and complete all Work under this Contract within 90 working days, beginning the effective date of the Notice to Proceed (“Contract Time”). Contractor shall perform its Work in strict accordance with any completion schedule, construction schedule or project milestones developed by the City. Such schedules or milestones may be included as part of Exhibits “A” or “B” attached hereto or may be provided separately in writing to Contractor.

Contractor agrees that if such Work is not completed within the aforementioned Contract Time and/or pursuant to any such completion schedule, construction schedule or project milestones developed pursuant to provisions of the Contract, it is understood, acknowledged and agreed that the City will suffer damage. Pursuant to Government Code Section 53069.85, Contractor shall pay to the City as fixed and liquidated damages the sum of $ 500 per day for each and every calendar day of delay beyond the Contract Time or beyond any completion schedule, construction schedule or Project milestones established pursuant to the Contract.

3.4 Standard of Performance; Performance of Employees. Contractor shall perform all Work under this Contract in a skillful and workmanlike manner, and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Work. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them. Finally, Contractor represents that it, its empl oyees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Work, including any required business license, and that such licenses and approvals shall be maintained throughout the term of this Contract. As provided for in the indemnification provisions of this Contract, Contractor shall perform, at its own cost and expense and without reimbursement from the City, any work necessary to correct errors or omissions which are caused by Contractor’s failure to comply with the standard of care provided for herein. Any employee who is determined by the City to be uncooperative, incompetent, a threat to the safety of persons or the Work, or any employee who fails or refuses to perform the Work in a manner acceptable to the City, shall be promptly removed from the Project by Contractor and shall not be re-employed on the Work.

3.5 Control and Payment of Subordinates; Contractual Relationship. City retains Contractor on an independent contractor basis and Contractor is not an employee of City. Any additional personnel performing the work governed by this Contract on behalf of Contractor shall at all times be under Contractor’s exclusive direction and control. Contractor sh all pay all wages, salaries, and other amounts due such personnel in connection with their performance under this Contract and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, and workers’ compensation insurance.

3.6 City’s Basic Obligation. City agrees to engage and does hereby engage Contractor as an independent contractor to furnish all materials and to perform all Work according to the terms and conditions herein contained for the sum set forth above. Except as otherwise provided in the Contract, the City shall pay to Contractor, as full consideration for the satisfactory performance by Contractor of the services and obligations required by this Contract, the below-referenced compensation in accordance with compensation provisions set forth in the Contract.

3.7 Compensation and Payment.
3 3.7.1 Amount of Compensation. As consideration for performance of the Work required herein, City agrees to pay Contractor the Total Con tract Price of Nine Hundred Sixty-Five Thousand Eig ht Hundred Four Dollars and Seventy Cents ($965,804.70) (“Total Contract Price”) provided that such amoun t shall be subject to adjustment pursuant to the appl icable terms of this Contract or written change ord ers approved and signed in advance by the City.

3.7.2 Payment of Compensation. If the Work is sche duled for completion in thirty (30) or less calendar days, City will arrange for payment of the Total Contract Price upon completion and approval by City of the Work. If the Work is scheduled for completi on in more than thirty (30) calendar days, City wil l pay Contractor on a monthly basis as provided for herein. On or before the fifth (5th) day of each month, Contractor shall submit to the City an itemized application fo r payment in the format supplied by the City indica ting the amount of Work completed since commencement of the Work or since the last progress payment. These applications shall be supported by evidence which is required by this Contract and such other documentation as the City may require. The Contractor shall certify that the Work for which payment is requested has been done and that the materials listed are stored where indicated. Contractor may be required to furnish a detailed schedule of values upon request of the City and in such detail and form as the City shall request, showing the quantities, unit prices, overhead, profit, and all other expenses involved in order to provide a basis for determining the amount of progress payments.

3.7.3 Prompt Payment. City shall review and pay al l progress payment requests in accordance with the provisions set forth in Section 20104.50 of the California Public Contract Code. However, no progress payments will be made for Work not completed in accordance with this Contract. Contractor shall comply with all applicable laws, rules and regulati ons relating to the proper payment of its employees , subcontractors, suppliers, or others.

3.7.4 Contract Retentions. From each approved progr ess estimate, five percent (5%) will be deducted and retained by the City, and the remainder will be paid to Contractor. All Contract retention shall be released and paid to Contractor and subcontractors pursuant to California Public Contract Code Section 7107.

3.7.5 Other Retentions. In addition to Contract retentions, the City may deduct from each progress payment an amount necessary to protect City from loss because of: (1) liquidated damages whic h have accrued as of the date of the application for payment; (2) any sums expended by the City in performing any of Contractor’s obligations under the Contract which Contractor has failed to perform or has perfo rmed inadequately; (3) defective Work not remedied; (4) stop notices as allowed by state law; (5) reasonable doubt that the Work can be completed for the unpaid balan ce of the Total Contract Price or within the schedu led completion date; (6) unsatisfactory prosecution of the Work by Contractor; (7) unauthorized deviations from the Contract; (8) failure of Contractor to maintain or submit on a timely basis proper and sufficient documentation as required by the Contract or by City during the prosecution of the Work; (9) erroneous or false estimates by Contractor of the value of the Work performed; (10) any sums representing expenses, losses, or damages as determined by the City, incurred by the City for which Contractor is liable under the Contract; and (11) any other sums which the City is entitled to recover from Contractor under the terms of the Contract or pursuant to state law, including Section 1727 of the California Labor Code. The failure by the City to deduct any of these sums from a progress payment shall not constitute a waiver of the City’s right to such sums.

3.7.6 Substitutions for Contract Retentions. In ac cordance with California Public Contract Code Section 22300, the City will permit the substitution of securities for any monies withheld by the City to ensure performance under the Contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the City, or with a state or federally chartered bank in California as the escrow agent, and thereafter the City shall then pa y such monies to Contractor as they come due. Upo n satisfactory completion of the Contract, the securi ties shall be returned to Contractor. For purposes of this Section and Section 22300 of the Public Contract Code, the term “satisfactory completion of the contract” shall 4 mean the time the City has issued written final accepta nce of the Work and filed a Notice of Completion as required by law and provisions of this Contract. Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon. The escrow agreement u sed for the purposes of this Section shall be in the form provided by the City.

3.7.7 Title to Work. As security for partial, progress, or other payments, title to Work for which such payments are made shall pass to the City at the time of payment. To the extent that title has not previously been vested in the City by reason of payments, full title shall pass to the City at delivery of the Work at the destination and time specified in this Contract. Such transferred title shall in each case be good, free and clear from any and all security interests, liens, or other encumbrances. Contractor promises and agrees that it will not pledge, hypothecate, or otherwise encumber the items in any manner that would result in any lien, security interest, charge, or claim upon or against said items. Such transfer of title shall not imply acceptance by the City, nor relieve Contractor from the responsibility to strictly comply with the Contract and shall not relieve Contractor of responsibility for any loss of or damage to items.

3.7.8 Labor and Material Releases . Contractor shall furnish City with labor and material releases from all subcontractors performing work on, or furnishing materials for, the Work governed by this Contract prior to final payment by City.

3.7.9 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720 et seq., and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. Since the Services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage La ws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Contract upon request. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request and shall post copies at Contractor’s principal place of business and at the project site.

Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. Contractor and any subcontractor shall forfeit a penalty of up to $200 per calendar day or portion thereof for each worker paid less than the prevailing wage rates.

3.7.10 Apprenticeable Crafts. When Contractor employs workmen in an apprenticeable craft or trade, Contractor shall comply with the provisions of Section 1777.5 of the California Labor Code with respect to the employment of properly registered apprentices upon public works. The primary responsibility for compliance with said section for all apprenticeable occupations shall be with Contractor. The Contractor or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law.

3.7.11 Hours of Work. Contractor is advised that eight (8) hours labor constitutes a legal day’s work. Pursuant to Section 1813 of the California Labor Code, Contractor shall forfeit a penalty of $25.00 per worker for each day that each worker is permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week, except when payment for overtime is made at not less than one and one-half (1-1/2) times the basic rate for that worker.

3.7.12 Payroll Records. Contractor and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages 5 paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. The payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contractor in the manner provided in Labor Code section 1776. In the event of noncompliance with the requirements of this section, Contractor shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects such Contractor must comply with this section. Should noncompliance still be evident after such 10 -day period, Contractor shall, as a penalty to City, forfeit not more than $100.00 for each calendar day or portion thereof, for each worker, until strict compliance is effectuated.

The amount of the forfeiture is to be determined by the Labor Commissioner. A contractor who is found to have violated the provisions of law regarding wages on Public Works with the intent to defraud shall be ineligible to bid on Public Works contracts for a period of one to three years as determined by the Labor Commissioner. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The responsibility for compliance with this section is on Contractor. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

3.7.13 Contractor and Subcontractor Registration. Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. Contractor is directed to review, fill out and execute the Public Works Contractor Registration Certification attached hereto as Exhibit “E” prior to contract execution. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

3.7.14 Labor Compliance; Stop Orders. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be the Contractor’s sole responsibility to evaluate and pay the cost of complying with all labor compliance requirements under this Contract and applicable law.

Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affect Contractor’s performance of Work, including any delay, shall be Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liqu idated damages and shall not be compensable by the City. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor.

3.8 Performance of Work; Jobsite Obligations.

3.8.1 Water Quality Management and Compliance.

3.8.1.1 Water Quality Management and Compliance. Contractor shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the pe rformance of the Work including, without limitation, all applicable provisions of the Federal Water Pollution Control Act (33 U.S.C. §§ 1300); the California Porter -Cologne Water Quality Control Act (Cal Water Code §§ 13000 -14950); local ordinances regulating discharges of storm water; and any and all regulations, policies, or permits issued 6 pursuant to any such authority regulating the discharge of pollutants, as that term is used in the Porter - Cologne Water Quality Control Act, to any ground or surface water in the State.

3.8.1.2 Compliance with the Statewide Construction General Permit.

Contractor shall comply with all conditions of the most recent iteration of the National Pollutant Discharge Elimination System General Permit for Storm Water Discharges Associated with Construction Activity, issued by the California State Water Resources Control Board (“Permit”). It shall be Contractor’s sole responsibility to file a Notice of Intent and procure coverage under the Permit for all construction activity whic h results in the disturbance of more than one acre of total land area or which is part of a larger common area of development or sale. Prior to initiating work, Contractor shall be solely responsible for preparing and implementing a Storm Water Pollution Prevention Plan (SWPPP) as required by the Permit. Contractor shall be responsible for procuring, implementing and complying with the provisions of the Permit and the SWPPP, including the standard provisions, and monitoring and reporting requirements as required by the Permit. The Permit requires the SWPPP to be a “living document” that changes as necessary to meet the conditions and requirements of the job site as it progresses through difference phases of construction and is subject to different weather conditions. It shall be Contractor’s sole responsibility to update the SWPPP as necessary to address conditions at the project site.

3.8.1.3 Other Water Quality Rules Regulations and Policies. Contractor shall comply with the lawful requirements of any applicable municipality, drainage City, or local agency regarding discharges of storm water to separate storm drain systems or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs.

3.8.1.4 Cost of Compliance. Storm, surface, nuisance, or other waters may be encountered at various times during construction of The Work. Therefore, the Contractor, by submitting a Bid, hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising therefrom.

3.8.1.5 Liability for Non -Compliance. Failure to comply with the Permit is a violation of federal and state law. Pursuant to the indemnification p rovisions of this Contract, Contractor hereby agrees to defend, indemnify and hold harmless the City and its officials, officers, employees, volunteers and agents for any alleged violations. In addition, City may seek damages from Contractor for any delay in completing the Work in accordance with the Contract, if such delay is caused by or related to Contractor’s failure to comply with the Permit.

3.8.1.6 Reservation of Right to Defend. City reserves the right to defend any enforcement action brought agai nst the City for Contractor’s failure to comply with the Permit or any other relevant water quality law, regulation, or policy. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to be bound by, and to reimburse the City for the costs (including the City’s attorney’s fees) associated with, any settlement reached between the City and the relevant enforcement entity.

3.8.1.7 Training. In addition to the standard of performance requirements set forth in paragraph 3.4, Contr actor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them without impacting water quality in violation of the laws, regulations and policies described in paragraph 3.8.1. Contractor further warrants that it, its employees and subcontractors will receive adequate training, as determined by City, regarding the requirements of the laws, regulations and policies described in paragraph 3.8.1 as they may relate to the Work provided under t his Agreement. Upon request, City will provide the Contractor with a list of training programs that meet the requirements of this paragraph.

7 3.8.2 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. Contractor shall comply with the requirements of the specifications relating to safety measures applicable in particular operations or kinds of work. In carrying out its Work, Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the Work and the conditions under which the Work is to be performed. Safety precautions as applicable shall include, but shall not be limited to, adequate life protection and lifesaving equipment; adequate illumination for underground and night operations; instructions in accident prevention for all employees, such as machinery guards, safe walkways, scaffolds, ladders, bridges, gang planks, confined space procedures, trenching and shoring, fall protection and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and adequate facilities fo r the proper inspection and maintenance of all safety measures.

Furthermore, Contractor shall prominently display the names and telephone numbers of at least two medical doctors practicing in the vicinity of the Project, as well as the telephone number of the local ambulance service, adjacent to all telephones at the Project site.

3.8.3 Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Contract or the Work, including all Cal/OSHA requirements, and shall give all notices required by law.

Contractor shall be liable for all violations of such laws and regulations in connection with Work. If Contractor observes that the drawings or specifications are at variance with any law, rule or regulation, it shall promptly notify the City in writing. Any necessary changes shall be made by written change order. If Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible for all costs arising therefrom. City is a public entity of the State of California subject to certain provisions of the Health & Safety Code, Government Code, Public Contract Code, and Labor Code of the State. It is stipulated and agreed that all provisions of the law applicable to the public contracts of a municipality are a part of this Contract to the same extent as though set forth herein and will be complied with. Contractor shall defend, indemnify and hold City, its officials, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Contract, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

3.8.4 Permits and Licenses. Contractor shall be responsible for securing City permits and licenses necessary to perform the Work described herein, including, but not limited to, any required business license. While Contractor will not be charged a fee for any City permits, Contractor shall pay the City’s business license fee, if any. Any ineligible contractor or subcontractor pursuant to Labor Code Sections 1777.1 and 1777.7 may not perform work on this Project.

3.8.5 Trenching Work. If the Total Contract Price exceeds $25,000 and if the Work governed by this Contract entails excavation of any trench or trenches five (5) feet or more in depth, Contractor shall comply with all applicable provisions of the California Labor Code, including Section 6705. To this end, Contractor shall submit for City’s review and approval a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer.

3.8.6 Hazardous Materials and Differing Conditions. As required by California Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, notify City of:
(1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II or Class III disposal site; (2) subsurface or latent physical conditions at the site differing from those indicated by City; and (3) unknown physical conditions of an unusual nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, City shall 8 promptly investigate the conditions to determine whether a change order is appropriate. In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all Work to be performed under the Contract, but shall retain all rights provided by the Contract or by law for making protests and resolving the dispute.

3.8.7 Underground Utility Facilities. To the extent required by Section 4215 of the California Government Code, City shall compensate Contractor for the costs of: (1) locating and repairing damage to underground utility facilities not caused by the failure of Contractor to exercise reasonable care; (2) removing or relocating underground utility facilities not indicated in the construction drawings; and (3) equipment necessarily idled during such work. Contractor shall not be assessed liquidated damages for delay caused by failure of City to provide for removal or relocation of such utility facilities.

3.8.8 Air Quality. Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the California Air Resources Board (CARB). Although CARB limits and requirements are more broad, Contractor shall specifically be aware of their application to "portable equipment", which defi nition is considered by CARB to include any item of equipment with a fuel -powered engine. Contractor shall indemnify City against any fines or penalties imposed by CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Contractor, its subcontractors, or others for whom Contractor is responsible under its indemnity obligations provided for in this Agreement.

3.8.9 State Recycling Mandates. Contractor shall comply with State Recycling Mandates.

Any recyclable materials/debris collected by the contractor that can be feasibly diverted via reuse or recycling must be hauled by the appropriate handler for reuse or recycling.

3.9 Completion of Work. When Contractor determines that it has completed th e Work required herein, Contractor shall so notify City in writing and shall furnish all labor and material releases required by this Contract. City shall thereupon inspect the Work. If the Work is not acceptable to the City, the City shall indicate to Contractor in writing the specific portions or items of Work which are unsatisfactory or incomplete. Once Contractor determines that it has completed the incomplete or unsatisfactory Work, Contractor may request a reinspection by the City. Once the Work is acceptable to City, City shall pay to Contractor the Total Contract Price remaining to be paid, less any amount which City may be authorized or directed by law to retain. Payment of retention proceeds due to Contractor shall be made in accordance with Section 7107 of the California Public Contract Code.

3.10 Claims; Government Code Claim Compliance.

3.10.1 Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferen ces, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this Section is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Section shall be construed to be consistent with said statutes.

3.10.2 Claims. For purposes of this Section, “Claim” means a separate demand by the Contractor, after a change order duly requested in accordance with the terms of this Contract has been denied by the City, for (A) a time extension, (B) payment of money or damages arising from Work done by or on behalf of the Contractor pursuant to the Contract, or (C) an amount the payment of which is disputed by the City.

Claims governed by this Section may not be filed unless and until the Contractor completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order, including but not 9 necessarily limited to the change order procedures contained herein, and Contractor’s request for a change has been denied in whole or in part. Claims governed by this Section must be filed no later than fourteen (14) days after a request for change has been denied in whole or in part or after any other event giving rise to the Claim. The Claim shall be submitted in writing to the City and shall include on its first page the following in 16 point capital font: “THIS IS A CLAIM.” Furthermore, the claim shall include the documents necessary to substantiate the claim. Nothing in this Section is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims, including all requirements pertaining to compensation or payment for extra Work, disputed Work, and/or changed conditions. Failure to follow such contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon.

3.10.3 Supporting Documentation. The Contractor shall submit all claims in the following format:

3.10.3.1 Summary of claim merit and price, reference Contract Document provisions pursuant to which the claim is made

3.10.3.2 List of documents relating to claim:
(A) Specifications
(B) Drawings
(C) Clarifications (Requests for Information)
(D) Schedules
(E) Other

3.10.3.3 Chronology of events and correspondence

3.10.3.4 Analysis of claim merit

3.10.3.5 Analysis of claim cost

3.10.3.6 Time impact analysis in CPM format

3.10.3.7 If Contractor’s claim is based in whole or in part on an allegation of errors or omissions in the Drawings or Specifications for the Project, Contractor shall provide a summary of the percentage of the claim subject to design errors or omissions and shall obtain a certificate of merit in support of the claim of design errors and omissions.

3.10.3.8 Cover letter and certification of validity of the claim, including any claims from subcontractors of any tier, in accordance with Government Code section 12650 et seq.

3.10.4 City’s Response. Upon receipt of a claim pursuant to this Section, City shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the Contractor a written statement identifying what portion of the claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the claim will be processed and made within 60 days after the public entity issues its written statement.

3.10.4.1 If City needs approval from its governing body to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, City shall have up to three days following 10 the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion.

3.10.4.2 Within 30 days of receipt of a claim, City may request in writing additional documentation supporting the claim or relating to defenses or claims City may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of City and the Contractor.

3.10.4.3 City’s written response to the claim, as further documented, shall be submitted to the Contractor within 30 days (if the claim is less than $50,000, within 15 days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater.

3.10.5 Meet and Confer . If the Contractor disputes City’s written response, or City fails to respond within the time prescribed, the Contractor may so notify City, in writing, either within 15 days of receipt of City’s response or within 15 days of City’s failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, City shall schedule a meet and confer conference within 30 days for settlement of the dispute.

3.10.6 Mediation. Within 10 business days following the conclu sion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, City shall provide the Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after City issues its written statement. Any disputed portion of the claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation, with City and the Contractor sharing the associated costs equally. City and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing, unless the parties agree to select a mediator at a later time.

3.10.6.1 If the Parties cannot agree upon a mediator, each Party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each Party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.

3.10.6.2 For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the Parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.

3.10.6.3 Unless otherwise agreed to by City and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.

3.10.6.4 The mediation shall be held no ear lier than the date the Contractor completes the Work or the date that the Contractor last performs Work, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation, unless a new unrelated claim arises after mediation is completed.

3.10.7 Procedures After Mediation. If following the mediation, the claim or any portion remains in dispute, the Contractor must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the 11 time the Contractor submits his or her written claim pursuant to subdivision (a) until the time the claim is denied, including any period of time utilized by the meet and confer conference or mediation.

3.10.8 Civil Actions. The following procedures are established for all civil actions filed to resolve claims subject to this Section:

3.10.8.1 Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to non -binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of these procedures.. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.

3.10.8.2 If the matter remains in dispute, the c ase shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration.

3.10.8.3 In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.

3.10.9 Government Code Claims. In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, claims and/or changed conditions, Contractor must comply with the claim procedures set forth in Government Code sections 900 et seq. prior to filing any lawsuit against the City. Such Government Code claims and a ny subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, claims, and/or changed conditions have been followed by Contractor. If no such Government Code claim is submitted, or if any prerequisite contractual requirements are not otherwise satisfied as specified herein, Contractor shall be barred from bringing and maintaining a valid lawsuit against the City. A Government Code claim must be filed no earlier than the date the work is completed or the date the Contractor last performs work on the Project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved claims unless a new unrelated claim arises after the Government Code claim is submitted.

3.10.10 Non-Waiver. City’s failure to respond to a claim from the Contractor within the time periods described in this Section or to otherwise meet the time requirements of this Section shall result in the claim being deemed rejected in its entirety. City’s failure to respond shall not waive City’s rights to any subsequent procedures for the resolution of disputed claims.

3.11 Loss and Damage. Except as may otherwise be limited by law, Contractor shall be responsible for all loss and damage which may arise out of the nature of the Work agreed to herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work until the same is fully completed and accepted by City.

3.12 Indemnification.

12 3.12.1 Scope of Indemnity. To the fullest extent permitted by law, Contractor shall defend, indemnify and hold the City, its officials, employees, agents and authorized volunteers free and harmless from any and all claims, demands, causes of action, suits, actions, proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, (collectively, “Claims”) in any manner arising out of, pertaining to, or incident to any alleged acts, errors or omissions, or willful misconduct of Contractor, its officials, officers, employees, subcontractors, consultants or agents in connection with th e performance of the Contractor’s services, the Project or this Agreement, including without limitation the payment of all consequential damages, expert witness fees and attorneys’ fees and other related costs and expenses. Notwithstanding the foregoing, to the extent required by Civil Code section 2782, Contractor’s indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of the City or the City’s agents, servants, or independent contractors who are directly responsible to the City, or for defects in design furnished by those persons.

3.12.2 Additional Indemnity Obligations. Contractor shall defend, with counsel of City’s choosing and at Contractor's own cost, expense and risk, any and all Claims covered by this section that may be brought or instituted against City or its officials, employees, agents and authorized volunteers. In addition, Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or its officials, employees, agents and authorized volunteers as part of any such claim, suit, action or other proceeding.

Contractor shall also reimburse City for the cost of any settlement paid by City or its officials, employees, agents and authorized volunteers as part of any such claim, suit, action or other proceeding. Such reimbursement shall include payment for City's attorney's fees and costs, includ ing expert witness fees. Contractor shall reimburse City and its officials, employees, agents and authorized volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provide d.

Contractor's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, its officials, employees, agents and authorized volunteers.

3.13 Insurance.

3.13.1 Time for Compliance. Contractor shall not commence Work under this Contract until it has provided evidence satisfactory to the City that it has secured all insurance required under this section.

In addition, Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this section. Failure to provide and maintain all required insurance shall be grounds for the City to terminate this Contract for cause.

3.13.2 Minimum Requirements. Contractor shall, at its expense, procure and maintain for the duration of the Contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work he reunder by Contractor, its agents, representatives, employees or subcontractors. Contractor shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Contract. Such insurance shall meet at least the following minimum levels of coverage:

3.13.2.1 Minimum Scope of Insurance. Coverage shall be at least as broad as the latest version of the following: (1) General Liability: Insurance Services Office Commercial General Liability coverage (occurrence form CG 00 01) OR Insurance Services Office Owners and Contractors Protective Liability Coverage Form (CG 00 09 11 88) (coverage for operations of designated contractor); (2) Automobile Liability: Insurance Services Office Business Auto Coverage form number CA 00 01, code 1 (any auto); and (3) Workers’ Compensation and Employer’s Liability: Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance. Policies shall not contain exclusions contrary to this Contract.
13 3.13.2.2 Minimum Limits of Insurance. Contractor shall maintain limits no less than: (1) General Liability: $5,000,000 per occurrence and $5,000,000 aggregate for bodily injury, personal injury and property damage; (2) Automobile Liability: $5,000,000 per accident for bodily injury and property damage; and (3) Workers’ Compensation and Employer’s Liability: Workers’ compensation limits as required by the Labor Code of the State of California. Employer’s Liability limits of $1,000,000 each accident, policy limit bodily injury or disease, and each employee bodily injury or disease. Defense costs shall be available in addition to the limits. Notwithstanding the minimum limits specified herein, any available coverage shall be provided to the parties required to be named as additional insureds pursuant to this Contract.

3.13.3 Insurance Endorsements. The insurance policies shall contain the following provisions, or Contractor shall provide endorsements (amendments) on forms supplied or approved by the City to add the following provisions to the insurance policies:

3.13.3.1 General Liability . (1) Such policy shall give the City, its officials, employees, agents and authorized volunteers additional insured status using ISO endorsements CG20 10 10 01 plus CG20 37 10 01, or endorsements providing the exact same coverage, with respect to the Work or operations performed by or on behalf of Contractor, including materials, parts o r equipment furnished in connection with such work; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the City, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any insurance or self -insurance maintained by the City, its officials, employees, agents and authorized volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it.

3.13.3.2 Automobile Liability. (1) Such policy shall give the City, its officials, employees, agents and authorized volunteers additional insured status with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the City, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any insura nce or self -insurance maintained by the City, its officials, employees, agents and authorized volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it in any way.

3.13.3.3 Workers’ Compensation and Employer’s Liability Coverage. The insurer shall agree to waive all rights of subrogation against the City, its officials, employees, agents and authorized volunteers for losses paid under the terms of the insurance policy which arise from work performed by Contractor.

3.13.3.4 All Coverages. Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or canceled except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its officials, employees, agents and authorized volunteers.

14 3.13.4 Separation of Insureds; No Special Limitations. All insurance required by this Section shall contain standard separation of insureds provisions. In addition, such insurance shall not contain any special limitations on the scope of pr otection afforded to the City, its officials, employees, agents and authorized volunteers.

3.13.5 Deductibles and Self -Insurance Retentions. Any deductibles or self -insured retentions must be declared to and approved by the City. Contractor shall guarantee that, at the option of the City, either: (1) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officials, employees, agents and authorized volunteers; or (2) the Contractor shall procure a bond or other financial guarantee acceptable to the City guaranteeing payment of losses and related investigation costs, claims and administrative and defense expenses.

3.13.6 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best’s rating no less than A:VII, licensed to do business in California, and satisfactory to the City.

Exception may be made for the State Compensation Insurance Fund when not specifically rated.

3.13.7 Verification of Coverage. Contractor shall furnish City with original certificates of insurance and endorsements effecting coverage required by this Contract on forms satisfactory to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms supplied or approved by the City. All certificates and endorsements must be received and approved by the City before work commences. The City reserves the right to require complete, certified copies of all required insurance policies, at any time.

3.13.8 Subcontractors. All subcontractors shall meet the requirements of this Section before commencing Work. Contractor shall furnish separate certificates and endorsements for each subcontractor. Subcontractor policies of General Liability insurance shall name the City, its officials, employees, agents and authorized volunteers as additional insureds using form ISO 20 38 04 13 or endorsements providing the exact same coverage. All coverages for subcontractors shall be subject to all of the requirements stated herein except as otherwise agreed to by the City in writing.

3.13.9 Reporting of Claims. Contractor shall report to the City, in addition to Contractor’s insurer, any and all insurance claims submitted by Contractor in connection with the Work under this Contract.

3.14 Bond Requirements.

3.14.1 Payment Bond. If required by law or otherwise specifically requested by City in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Contract a Payment Bond in an amount required by the City and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the City.

3.14.2 Performance Bond. If specifically requested by City in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Contract a Performance Bond in an amount required by the City and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the City.

3.14.3 Bond Provisions. Should, in City’s sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the effected bond within (ten) 10 days of receiving notice from City. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable 15 replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Contract until any replacement bonds required by this Section are accepted by the City. To the extent, if any, that the Total Contract Price is increased in accordance with the Contract, Contractor shall, upon request of the City, cause the amount of the bond to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the City. If Contractor fails to furnish any required bond, the City may terminate the Contract for cause.

3.14.4 Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in California Code of Civil Procedure Section 995.120, shall be accepted. If a California-admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City.

3.15 Warranty. Contractor warrants all Work under the Contract (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non-conforming materials incorporated into the Work) to be of good quality and free from any defective or faulty material and workmanship.

Contractor agrees that for a period of one year (or the period of time specified elsewhere in the Contract or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) after the date of final acceptance, Contractor shall within ten (10) days after being notified in writing by the City of any defect in the Work or non-conformance of the Work to the Contract, commence and prosecute with due diligence all Work necessary to fulfill the terms of the warranty at its sole cost and expense. Contractor shall act sooner as requested by the City in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair and replace any portions of the Work (or work of other contractors) damaged by its defective Work or which becomes damaged in the course of repairing or replacing defective Work. For any Work so corrected, Contractor’s obligation hereunder to correct defective Work shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected Work. Contractor shall perform such tests as the City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract.

All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of Contractor.

All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the Work, whether express or implied, are deemed to be obtained by Contractor for the benefit of the City, regardless of whether or not such warranties and guarantees have been transferred or assigned to the City by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the City. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Contract, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non -conforming Work and any work damaged by such work or the replacement or correction thereof at Contractor’s sole expense. Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder upon demand.

3.16 Employee/Labor Certifications.

3.16.1 Contractor’s Labor Certification. By its signature hereunder, Contractor certifies that he is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self -insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Work. A certification form for this purpose, which is attached to this Contract as Exhibit “D” and incorporated herein by reference, shall be executed simultaneously with this Contract.

3.16.2 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal 16 Constitutions. Such non -discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

3.16.3 Verification of Employment Eligibility. By executing this Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors and sub -subcontractors to comply with the same.

3.17 General Provisions.

3.17.1 City’s Representative. The City hereby designates the General Manager, or his or her designee, to act as its representative for the performance of this Contract (“City’s Representative”). City’s Representative shall have the power to act on behalf of the City for all purposes under this Contract. Contractor shall not accept direction or orders from any person other than the City’s Representative or his or her designee.

3.17.2 Contractor’s Representative. Before starting the Work, Contractor shall submit in writing the name, qualifications and experience of its proposed representative who shall be subject to the review and approval of the City (“′Contractor’s Representative”). Following approval by the City, Contractor’s Representative shall have full authority to represent and act on behalf of Contractor for all purposes under this Contract. Contractor’s Representative shall supervise and direct the Work, using his best skill and attention, and shall be responsible for all construction means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Work under this Contract. Contractor’s Representative shall devote full time to the Project and either he or his designee, who shall be acceptable to the City, shall be present at the Work site at all times that any Work is in progress and at any time that any employee or subcontractor of Contractor is present at the Work site. Arrangements for responsible supervision, acceptable to the City, shall be made for emergency Work which may be required. Should Contractor desire to change its Contractor’s Representative, Contractor shall provide the information specified above and obtain the City’s written approval.

3.17.3 Termination. This Contract may be terminated by City at any time, either with or without cause, by giving Contractor three (3) days advance written notice. In the event of termination by City for any reason other than the fault of Contractor, City shall pay Contractor for all Work performed up to that time as provided herein. In the event of breach of the Contract by Contractor, City may terminate the Contract immediately without notice, may reduce payment to Contractor in the amount necessary to offset City’s resulting damages, and may pursue any other available recourse against Contractor. Contractor may not terminate this Contract except for cause. In the event this Contract is terminated in whole or in part as provided, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. Further, if this Contract is terminated as provided, City may require Contractor to provide all finished or unfinished documents, data, diagrams, drawings, materials or other matter prepared or built by Contractor in connection with its performance of this Contract.

3.17.4 Contract Interpretation. Should any question arise regarding the meaning or import of any of the provisions of this Contract or written or oral instructions from City, the matter shall be referred to City’s Representative, whose decision

3.17.5 Anti-Trust Claims. This provision shall be operative if this Contract is applicable to California Public Contract Code Section 7103.5. In entering into this Contract to supply goods, services or materials, Contractor hereby offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the Contract. This assignment 17 shall be made and become effective at the time the City tender final payment to Contractor, without further acknowledgment by the Parties.

3.17.6 Notices. All notices hereunder and communications regarding interpretation of the terms of the Contract or changes t hereto shall be provided by the mailing thereof by registered or certified mail, return receipt requested, postage prepaid and addressed as follows:

CONTRACTOR:

CITY:

City of Merced
2525 “O” Street
Merced, California 95340
Attn: Richard Maddox, PE
City Engineer

Any notice so given shall be considered received by the other Party three (3) days after deposit in the U.S.

Mail as stated above and addressed to the Party at the above address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.17.7 Time of Essence. Time is of the essence in the performance of this Contract.

3.17.8 Assignment Forbidden. Contractor shall not, either voluntarily or by action of law, assign or transfer this Contract or any obligation, right, title or interest assumed by Contractor herein without the prior written consent of City. If Contractor attempts an assignment or transfer of this Contract or any obligation, right, title or interest herein, City may, at its option, terminate and revoke the Contract and shall thereupon be relieved from any and all obligations to Contractor or its assignee or transferee.

3.17.9 No Third Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties.

3.17.10 Governing Laws; Venue. This Agreement shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Agreement, the action shall be brought in a state or federal court situated in the Count y of Merced, State of California.

3.17.11 Counterparts. This Contract may be executed in counterparts, each of which shall constitute an original.

3.17.12 Successors. The Parties do for themselves, their heirs, executors, administrators, successors, and assigns agree to the full performance of all of the provisions contained in this Contract.

3.17.13 [Reserved]
18 American Paving Co.
525 W. Alluvial Avenue
Freno, CA 93711
Stephen J. Poindexter, President

3.17.14 Solicitation. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to terminate this Contract without liability.

3.17.15 Conflict of Interest. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Agreement. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Contract, no official, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. In addition, Contractor agrees to file, or to cause its employees or subcontractors to file, a Statement of Economic Interest with the City’s Filing Officer as required under state law in the performance of the Work.

3.17.16 Certification of License.

3.17.16.1 Contractor certifies that as of the date of execution of this Contract, Contractor has a current contractor’s license of the classification indicated below under Contractor’s signature.

3.17.16.2 Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation.

A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826.

3.17.17 Authority to Enter Contract. Each Party warrants that the individuals who have signed this Contract have the legal power, right and authority to make this Contract and bind each respective Party.

3.17.18 Entire Contract; Modification. This Contract contains the entire agreement of the Parties with respect to the subject matter hereo f, and supersedes all prior negotiations, understandings or agreements. This Contract may only be modified by a writing signed by both Parties.

3.17.19 Non-Waiver. None of the provisions of this Agreement shall be considered waived by either party, unless such waiver is specifically specified in writing.

3.17.20 City’s Right to Employ Other Contractors . City reserves right to employ other contractors in connection with this Project or other projects.

[SIGNATURES ON NEXT PAGE]
19 EXHIBIT “A” - SERVICES / SCHEDULE

The work to be performed includes, but not limited to, spot repairs of street pavement, curb, and gutter, removal of existing stripping, slurry seal of pavement, re-stripping of pavement, and removal of traffic signal devices.

Such other items or details, not menti oned above, that are required by the Drawings and Technical Specifications Plans, City of Merced Standard Specifications and Typical Details, and the Special Conditions shall be performed, placed, constructed, or installed.

The project is located downtown Merced on Main Street, 18th Street, and Canal Street. Bids are required for the entire work described herein.

The work shall be Completed within 90 working days of Notice to Proceed.

21 22
23 EXHIBIT “B” - DRAWINGS AND TECHNICAL

SPECIFICATIONS

All work shall be completed in accordance with the 2023 Caltrans Standard Specifications, Caltrans Standard Plans, and supplemented by the technical provisions included herein.

Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the Caltrans Standard Specifications for any other reference to a paragraph of the Caltrans Standard Specifications.

1. SCOPE OF WORK
The work to be performed includes, but is not limited to, spot repairs of street pavement, curb, and gutter, removal of existing stripping, slurry seal of pavement, re-stripping of pavement, and removal of traffic signal devices as shown in drawings and described in these specifications. .

2. PERFORMANCE
Furnish all labor, materials, tools, equipment, incidentals, and do all work described in the Plans and these Special Provisions.

3. COORDINATION/COOPERATION
Notify the Engineer at (209) 385-6846 at least three (3) working days in advance of the tentative starting date.

You are responsible for contacting and coordinating with all utility companies, including the City, with regards to the location of existing underground facilities in the construction area. Call Underground Service Alert at (800) 642 -2444, at least 2 working days before commencement of underground work for location of underground facilities.

Utility facilities damaged, temporarily disconnected, or relocated as a result of construction must be repaired/reconnected as directed by the governing utility at your expense.

Full compensation for conforming to the requirements of this is included in the price paid for the various items of work.

4. INSPECTION OF SITE
Inspect the work site and note all existing conditions before submitting a bid for this project.

5. PERMITS, BONDS, LICENSES AND INSURANCE
Procure all permits, bonds, licenses and insurance, pay all charges and fees, and give all notices necessary and incidental to the prosecution of the work.

Full compensation for conforming to the requirements of this is included in the price paid for the various items of work.
24 6. PUBLIC CONVENIENCE AND SAFETY
Public convenience and safety includes all work associated with section 7-1.03 and section 12 of the Standard Specifications. The Contractor shall be responsible for all the provisions of this item, including issuance of all notices necessary for prosecution of the work.

Construction Area Signs -- Construction area signs and traffic cones shall be furnished, installed, maintained, and removed when no longer required in accordance with the provisions in Section 12, "Temporary Traffic Control," of the State Specifications, and these Special Provisions. Specifically included in this item are all detour signage.

The Contractor shall notify the appropriate regional notification center for operators of subsurface installations at least two (2) working days, but not more than 14 calendar days, prior to commencing any excavation for construction area sign posts. The regional notification centers include, but not limited to the following:

Notification Center Telephone
Underground Service Alert (USA) 1-800-227-2600 (Northern California)

All excavations required to install construction area signs shall be performed by hand methods without the use of power equipment, except that power equipment may be used if it is determined that there were no utility facilities in the area of the proposed post holes.

Sign substrates for stationary mounted construction area signs may be fabricated from fiberglass reinforced plastic as specified under “Prequalified and Tested Signing and Delineation Materials” elsewhere in these Special Provisions.

Type IV reflective sheeting for sign panels for portable construction area signs shall conform to the requirements specified under “Prequalified and Testing Signing and Delineation Materials” elsewhere in these Special Provisions.

The term “construction area signs” shall also include temporary object markers required for the direction of public traffic through or around the work during construction. Object markers listed or designated on the plans as construction area signs shall be considered to be signs and shall be furnished, erected, maintained and removed by the Contractor in the same manner specified for construction area signs and the following:

-Object markers shall be stationary mounted on w ood or metal posts in accordance with the details shown on the plans and the requirements in Section 82, “Markers and Delineators,” of the Standard Specifications.
-Marker panels for Type N, Type P and Type R object markers shall conform to the requirements for sign panels for stationary mounted signs.
-Target plates for Type K and Type L object markers and posts, reflectors and hardware shall conform to the requirements in said Section 82, but need not be new.

When a street section is to be closed, it shall be solidly barricaded, and signs shall be posted at the closure points indicating “Street Closed.”

25 Full cost of providing and removing construction area signs shall be borne exclusively by the Contractor and shall be considered as included in the co ntract lump sum price for Item 10 -1.07, “Public Convenience & Safety.”

Maintaining Traffic -- Attention is directed to Section 7-1.03, "Public Convenience," Section 7-1.04, "Public Safety," and Section 12, "Temporary Traffic Control," of the State Specifications. Nothing in these Special Provisions shall be construed as relieving the Contractor from its responsibility as provided in Section 7-

1.04 of the State Specifications.

All traffic cones used for night lane closures shall have reflective cone sleeves as specified in the specifications. One (1) 12-foot wide traffic lane must be open at all times.

The second and third paragraphs of Section 12-3.10, “Traffic Cones,” of the State Standard Specifications are amended to read:

The type of reflective cone sleeve used shall be at the option of the Contractor. Only one type of reflective cone sleeve shall be used on the project.

Lane closures shall conform to the provisions in the section of these special provisions entitled “Traffic Control System for Lane Closure.”

Personal vehicles of the Contractor's employees shall not be parked on the traveled way or shoulders, including any section closed to public traffic.

The Contractor shall notify local authorities of its intent to begin work at least five (5) days before work is begun. The Contractor shall cooperate with local authorities relative to handling traffic through the area and shall make its own arrangements relative to keeping the working area clear of parked vehicles.

The Contractor shall provide access to all businesses and residences within the construction zone at all times throughout the project. When the work requires the closing of a business driveway or other entrance, the Contractor shall post signs directing the public to the most convenient access to the business.

The Contractor shall provide access to all private driveways when construction is not actively in progress.

Access to driveways fronting the construction area shall not be hindered or blocked for time periods greater than 4 hours without notifying the property owner or tenant in writing 24 hours prior to blockage.

The Contractor shall provide safe public access around the work site in accordance with the American Disabilities Act requirements during the work.

Whenever vehicles or equipment are parked on the shoulder within six feet of a traffic lane, the shoulder area shall be closed with fluorescent traffic cones or portable delineators placed on a taper in advance of the parked vehicles or equipment and along the edge of the pavement at 25-foot intervals to a point not less than 25 feet past the last vehicle or piece of equipment. A minimum of nine (9) cones or portable delineators shall be used for the taper. A C23 (Road Work Ahead) or C24 (Shoulder Work Ahead) sign shall be mounted on a telescoping flag tree with flags. The flag tree shall be placed where directed by the Engineer.

When the Contractor’s operations create a condition hazardous to traffic or to the public, he shall furnish, erect and maintain, at his expense and without cost to the City, such fences, barricades, lights, signs and other devices as are necessary to prevent accidents or damage or injury to the public. The Contractor shall also furnish such flagmen, provided with the necessary equipment kept clean and in good condition by the Contractor at his expense, as may be necessary to give adequate warning to traffic or to the public that the roadway is under construction or of any dangerous conditions to be encountered. The flagmen shall perform 26 their duties and their work of furnishing and placing such signs, lights, flags and other warning and safety devices as set forth in the current “Work Area Traffic Control Handbook” as published by the Building News, Inc., Los Angeles, California.

Minor deviations from the requirements of this section concerning hours of work which do not significantly change the cost of the work may be permitted upon the written request of the Contractor if, in the opinion of the Engineer, public traffic will be better served, and the work expedited. Such deviations shall not be adopted until the Engineer has indicated its written approval. All other modifications will be made by contract change order.

Full cost of conforming to this section shall be considered as included in the contract lump sum price for “Public Convenience and Safety.”

Traffic Control System for Lane Closure -- A traffic control system shall be provided by the Contractor and shall be in accordance with the provisions of Section 12, "Temporary Traffic Control," of the State Specifications, the provisions under "Maintaining Traffic" elsewhere in these Special Provisions.

The provisions in this section shall not relieve the Contractor from its responsibility to provide such additional devices, or take such measures as may be necessary, to comply with the provisions in Section 7 -1.04, "Public Safety," of the State Standard Specifications.

Prior to any lane closures, it shall be the responsibility of the Contractor to provide 72-hour notice to the City and obtain City approval of the lane closure. Failure to notify the City in a timely manner is cause for the City to prevent the lane closure.

Whenever a lane closure is made, the Contractor shall close the lane by placing fluorescent traffic cones, portable cones, portable delineators, or other devices approved by the Engineer, along a taper and along the edge of the closed lane adjacent to public traffic. One telescoping flag tree with flags shall be placed at the beginning and at the end of the taper.

If any component in the traffic control system is displaced or ceases to operate or function as specified, from any cause, during the progress of the work, the Contractor shall immediately repair said component to its original condition or replace said component and shall restore the component to its original location. Full cost of providing flaggers shall be borne exclusively by the Contractor.

The Contractor shall submit a traffic control plan and approved by the City Engineer prior to commencing any work.

Protection of the Work -- To minimize traffic congestion during the resurfacing operation, the work shall be done in stages. Residents with driveways within the closed section shall be notified at least 24 hours in advance of closure via door hangers and signs within the limits of the project.

Barricades and signs and their cost of replacement, the cost of flagmen necessary for the protection of the work and the public and costs of notification of affected residents will be considered as included in the contract price paid for bid items shown in the proposal, and no separate payments shall be made.

Payment for "Public Convenience and Safety," shall be at the contract lump sum price as set forth in the proposal, and shall include all labor, materials, tools, equipment, and all work necessary for the completion of this item.

7. RESTORATION
The Contractor shall restore all areas adjacent to the construction area and areas affected during construction to their preconstruction condition. Specifically included in thi s item are all concrete and asphalt pavement, 27 signs, concrete curb and gutter, curb drains, driveway and alley approach, sidewalk, pavement markings, landscaping, and irrigation, fencing and all items damaged during construction.

The Contractor shall also modify any water sprinkler service that has to be moved back of the new sidewalk so that it remains functional after modification. Sprinkler head shall be at the same height as the finished adjacent surface. Contractor shall make the modifications using th e same type of materials as the existing system, or materials as approved by the Engineer. Contractor shall remove sidewalk formwork, cleanup and backfill with soil and re-sod to match existing landscaping.

Payment for Item, “Restoration,” shall be at the contract lump sum price as set forth in the proposal and shall include all labor, materials, tools, equipment, and all work necessary for the completion of this item.

8. EXISTING FACILITIES (per Caltrans Standard Spec 15-1) Add to the end of section 15-1.03C:

At least 2 business days before hauling the material to the salvaged material stockpile location, notify the Engineer and inform the district recycle coordinator at telephone no. (209) 385-6800.

The stockpile location is:
1776 Grogan Avenue
Merced, CA 95341

REMOVE TRAFFIC STRIPES, PAVEMENT MARKERS, AND MARKINGS
The work shall consist of removing the existing traffic stripes, pavement markers and markings before making changes to the traffic pattern and shall be in accordance with Section 15 . Removed materials shall be disposed of by the Contractor as provided in Section 14 -10, “Solid Waste Disposal and Recycling,” of the State Specifications.

9. SEAL COATS (per Caltrans Standard Spec 37-3)
Add to section 37-3.01B(2):

Aggregate for slurry seals must be Type II and III respectively.

10. OVERHEAD SIGN STRUCTURES, STANDARDS, AND POLES (per Caltrans Stand Spec 56-1) Add to section 56-3.01C(1):

The sign mounting hardware must be installed at the locations shown.

Install roadway signs on signal mast arms using a minimum 3/4 by 0.020-inch round edge stainless steel strap and saddle bracket. Wrap the strap at least twice around the mast arm, tighten, and secure with a 3/4-inch stainless strap seal. Level the sign panel and tighten the hardware securely.

11. MARKINGS (per Caltrans Standard Spec, 84-2 Traffic Stripes and Pavement Markings) Replace Reserved Section 84-2.03B(8) with:
84-2.03B(8) Traffic Stripe Widths
Traffic Stripe Details 1 through 32 shall use a 4" wide stripe. 28 12. ELECTRICAL SYSTEMS (per Caltrans Standard Spec, 87-1)

Replace the 2nd paragraph of section 87-1.03H(2) with:

Use Method B to insulate a splice.

Add to the end of section 87-21.03C:

Modifying a signal and lighting system includes removing, adjusting, or adding:

1. Foundations

2. Conductors

3. Cables

4. Standards

5. Signal heads

6. Detectors

Add to the end of section 87-21.03D:

Removing a sign pole includes removing:

1. Foundations

2. Standards

3. Mast arm

4. Mast arm sign

13. REMOVE CONCRETE CURB AND GUTTER (per Caltrans Standard Spec, 41-11) The contractor shall remove portions of the concrete curb and gutter as shown on the plans. Unless otherwise noted, all concrete shall be removed to the nearest expansion joint. Existing concrete shall be sawcut and removed per Section 41-11 “Removing Concrete Pavement and Base”.

The quantities of Portland cement concrete curb and gutter removed will be measured and paid for by linear feet.

Surplus material shall become the property of the Contractor and shall be disposed of at the Contractor’s expense outside the right-of-way.

14. REMOVE ASPHALT CONCRETE
Remove existing Asphalt Concrete Pave ment, Base and/or Subgrade in dig -out areas to the depth of damaged pavement. Existing asphalt shall be sawcut to provide a smooth transition.

Nothing herein shall be construed as relieving the Contractor of his responsibility for final clean up as provided in Section 4-1.13, “Cleanup”
All surplus material shall become the property of the Contractor and shall be disposed of in accordance with the provisions in Section 14-11, “Hazardous Waste and Contamination,” and Section 5-1.20B(4), “Contractor- Property Owner Agreement,” of the State Specifications.

29 15. CONCRETE CURB AND GUTTER
The Contractor shall install concrete curb and gutter in accordance with the current City of Merced Standard SCG-1 (Sidewalk, Curb and Gutter Section) and SCG -4 (General Requirements – Sidewalk, Curb and Gutter), the Plans, and these Special Provisions. This item shall include subgrade preparation, base material, compaction, and all conditions described in the applicable City of Merced Standard Designs.

Unless the curb replacement is for an entire length of the property frontage, curb height and gutter pan width shall match existing adjacent curb dimensions.

Where curb replacement covers a full property frontage, the curb height and/or gutter pan width shall be City Standard SCG-1 dimensions. Transition curb and gutter dimensions over a distance of 3 feet from existing to City Standard SCG-1 dimensions.

Aggregate base shall be Class 2 with 4 inches minimum depth and shall conform to the provisions in Section 26 “Aggregate Bases,” of the State Specifications, the Plans, and these Special Provisions. The aggregate shall conform to the ¾ -inch maximum grading specified in Section 26 -1.02B, “Class 2 Aggregate Base,” of the State Specifications.

The Contractor shall moisture condit ion subgrade to at least 3% above the optimum moisture content to a depth of 12” and compact existing sub -grade to 90%, but not more than 95%, followed by Caltrans Class 2 aggregate base uniformly moisture condition compacted to 95% relative compaction, as determined by ASTM D1557.

16. ASPHALT CONCRETE (per Caltrans Standard Spec, 39-1) The Contractor shall install new asphalt to match existing asphalt depth in dig-out pavement repairs.

17. AGGREGATE BASE (per Caltrans Standard Spec, 26-1)
The Contractor shall install new aggregate base in dig-out pavement repairs.

30 BUS
1 CITY OF MERCEDCITY OF MERCEDMAIN STREET DIRECTIONAL ENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846DE9ELOPMENT SER9ICE CITY MERCED, CALIFORNIAOFINCORPORATED APRIL 1, A.D. 1889 "Gateway to Yosemite"City of Merced
COVER SHEETDEMOLITION PLAN / CONSTRUCTION PLAN - MAIN STREETDEMOLITION PLAN / CONSTRUCTION PLAN - MAIN STREET123D A T E

COVER SHEET
SHT. NO.D E S C R I P T I O NLos BanosFresnoMaderaAtwaterTurlockModestoMercedTracyDos Palos9ICINITY MAPUTILITY COMPANY AND CITY OF MERCED CONTACTSREGISTERED PROFESSIONAL SEAL APPROVALSSHEET INDEXEWSNChowchillaMariposaMendotaLOCATION MAP - NOT TO SCALELEGENDGENERAL NOTES H6

MAIN STREET DIRECTIONAL
EWN R I C H A R D A. M A D D O X , P . E .I N T E R I M C I T Y E N G I N E E R Manteca

MAIN STREETPROJECT SITE
YOU DIGBEFORETWO DAYSUSAUnderground Service AlertFILE NO. 1030PROJECT NO. CP2300143 PROJECT NO. CP230014MAIN STREETMLK JR WAYK STREETN STREETO STREET

M STREETCANAL STPROJECT SITE

PROJECT SITEPROJECT SITE

PAVEMENT DELINEATION DOWNTOWN MERCED CIRCULATION
PAVEMENT DELINEATION-18TH STREET AND CANAL STREET
PAVEMENT DELINEATION-MAIN STREET FROM "R" ST TO "M" ST
PAVEMENT DELINEATION-MAIN STREET FROM CANAL ST TO "G" ST DEMOLITION PLAN-18TH STREET AND CANAL STREET
DEMOLITION PLAN-MAIN STREET FROM "R" STREET TO "M" STREET DEMOLITION PLAN-MAIN STREET FROM CANAL STREET TO "G" STREET

PAVEMENT DELINEATION DETAILS

PAVEMENT DELINEATION DETAILS

TRAFFIC SIGNAL MODIFICATIONS MERCED CIRCULATION IMPROVEMENTS TRAFFIC SIGNAL MODIFICATIONS-18TH STREET AT CANAL STREET TRAFFIC SIGNAL MODIFICATIONS-"N" STREET AT MAIN STREET
TRAFFIC SIGNAL MODIFICATIONS-"M" STREET AT MAIN STREET

TRAFFIC SIGNAL MODIFICATIONS- MAIN STREET AT CANAL STREET TRAFFIC SIGNAL MODIFICATIONS-"K" STREET AT MAIN STREET

TRAFFIC SIGNAL MODIFICATIONS- MLK JR WAY AT MAIN STREET PD-1
PD-2
PD-3
PD-4
PD-5
PD-6
PD-7
PD-8
E-1
E-2
E-3
E-4
E-5
E-6

10/28/2024
9/20/24
RE-BID
31 2MAIN STREET DIRECTIONALMAIN STREETYOU DIGBEFORETWO DAYSUSAUnderground Service AlertENGINEERING PRO-E&T6 AND 6TANDARD6 : WK 6WUHHW 2

3DEPARTMENT OF ENGINEERING
&IT< MER&ED &A/IFORNIAOFIN&ORPORATED APRI/  AD 

GDWHZD\ WR <RVHPLWHCity of Merced

O STREET

N STREET

M STREETMAIN STREET
PROJECT NO. CP230014
MAIN STREET SITE PLAN2
3 N
32 DRI9E O9ER &8R%
6&GA
9ERTI&A/ &8R%
6&G

RIG+T OF :A<FOR &8/DE6A&9ERTI&A/ &8R%
6&G


RIG+T OF :A<DRI9E O9ER &8R%
6&GA

RIG+T OF :A<

RIG+T OF :A<FOR &8/DE6A&NOTE6
:+ERE 
R: E;I6T6 PAR.:A< :IDT+6 MA< %E RED8&ED A&&ORDING/<2NE:/< &ON6TR8&TED OR RE&ON6TR8&TED 6TREET6 AND A//E<6 6+A// NOT %E TREN&+EDD8RING T+E T:O<EAR PERIOD AFTER PA9ING 8N/E66 APPRO9ED %< T+E &IT< ENGINEER3PAR. 6TRIP6 ARE RE48IRED ON /O&A/ 6TREET6 E;&EPT FOR &8/DE6A&6
PA9EMENT 6E&TION6 GREATER T+AN 2 2IN&+E6 6+A// %E P/A&ED IN A MINIM8M OF T:O /IFT6IN&REA6E TI AND MINIM8M PA9ING 6E&TION TO A&&O8NT FOR 3 REF86E TR8&. TRIP6 PER :EE.3MAIN STREET DIRECTIONALMAIN STREETYOU DIGBEFORETWO DAYSUSAUnderground Service AlertENGINEERING PRO-E&T6 AND 6TANDARD6 : WK 6WUHHW 2

3DEPARTMENT OF ENGINEERING
&IT< MER&ED &A/IFORNIAOFIN&ORPORATED APRI/  AD 

GDWHZD\ WR <RVHPLWHCity of Merced
PROJECT NO. CP230014

CANAL STREETMAIN STREET

K STREET
MLK JR WYMAIN STREET SITE PLAN1 MAIN STREET
3 N
ST-1 LOCAL STREET2
33 BUS
T
T
T
T
T

8.0'

8.0' 207' OF DETAIL 3250' OF DETAIL 38208' OF DETAIL 3250' OF DETAIL 38ex. white crosswalkex. white crosswalk12" WHITE CROSSWALKex. detail 23

11.0'10.0'

15.0'14.5'14.5'
12" WHITE CROSSWALK12" WHITE CROSSWALK16.75'12.75'2.75'R8 PAINT 20.5' OF RED CURB

17.510.020.5ex. R99Cex. R32 (CA)"30 MIN"
ex. W11-2 & W16-7P
PAINT 35.5' OF RED CURBPAINT 20' OF RED CURBPAINT 16.5' OF RED CURBPAINT 40' OF RED CURBPAINT 20' OF RED CURBPAINT 35' OF RED CURBPAINT 19.5' OF RED CURBPAINT 20' OF RED CURBPAINT 42.5' OF RED CURBPAINT 27.5' OF RED CURBPAINT 8.5' OF RED CURBPAINT 20' OF RED CURBPAINT 9' OF RED CURBPAINT 20' OF RED CURBPAINT 21' OF RED CURBPAINT 33' OF RED CURBPAINT 22' OF GREEN CURBex. "SKATEBOARDSROLLERBLADES OR SIMILARDEVICES ARE NOT ALLOWED" sign ex. R1-1 & R1-3Pex. "NO BICYCLE RIDINGON SIDEWALK" signex. R1-1 & R1-3Pex. R1-1 & R1-3Pex. R1-1, R1-3P & SNS PAINT 20' OF RED CURBex. white crosswalkex. white crosswalk100' OF DETAIL 22100' OF DETAIL 2250' OF DETAIL 38100' OF DETAIL 22100' OF DETAIL 2250' OF DETAIL 38ex. detail 38PAINT 17.5' OF RED CURB PAINT 32' OF RED CURBPAINT 32' OF BLUE CURB

26.75'

10.0'11.0'11.0'11.0'10.0'11.0'8.0'8.0'

11.0'10.0'8.0'11.0'

8.0'11.0'8.0'11.0'10.0'11.0'

11.0'10.0'11.0'8.0'

8.0'11.0'10.0'ex. red curbex. red curbex. red curbex. red curbex. red curbex. red curbex. red curb

60.0'10.5'

4.0'60.0'10.5'PAINT 103' OF GREEN CURB

60.0'10.5'

60.0'10.5'

5.0'60.0'
R4-11
R4-11ex. R6-6ex. L-1 (CA) PAINT 21' OF GREEN CURB
T
T
TT
V
T
T
T

11.0'10.0'8.0'8.0' 218' OF DETAIL 3250' OF DETAIL 38211' OF DETAIL 3212" WHITE CROSSWALK12" WHITE CROSSWALK ex. white crosswalk
ex. white crosswalkex. detail 23ex. detail 39a
ex. R32 (CA) "30 MIN"ex. R32 (CA) "30 MIN"11.0' PAINT 33' OF RED CURBPAINT 34' OF RED CURBPAINT 20' OF RED CURBPAINT 14' OF RED CURBPAINT 20' OF RED CURBPAINT 25' OF RED CURBPAINT 23' OF RED CURBPAINT 38.5' OF RED CURBPAINT 26' OF RED CURBPAINT 24' OF RED CURBPAINT 27.5' OF RED CURBPAINT 25' OF RED CURBPAINT 10' OF RED CURBPAINT 22' OF GREEN CURBPAINT 22' OF GREEN CURBPAINT 22' OFGREEN CURBex. R1-1 & R1-3Pex. R1-1 & R1-3Pex. R1-1 & R1-3Pex. R1-1 & R1-3Pex. R1-1 & R1-3P ex. R1-1, R1-3P & SNS
ex. neighborhoodwatch signex. R1-1, R1-3P & SNS
ex. R1-1 & R1-3P

11.0'

8.0'8.0'10.0'11.0'100' OF DETAIL 22100' OF DETAIL 2250' OF DETAIL 38100' OF DETAIL 2250' OF DETAIL 3850' OF DETAIL 38100' OF DETAIL 22PAINT 20' OF RED CURB

8.0'11.0'10.0'11.0'11.0'10.0'

11.0'8.0'

11.0'10.0'11.0'

10.0'11.0'11.0'8.0'
ex. red curb

60.0'10.5'

60.0'10.5'

60.0'10.5'

60.0'10.5' ex. R32 (CA) "30 MIN"50' OF DETAIL 2310.0'17.5'ex. R2-1 "30"ex. detail 39ex. detail 39PAINT 20' OF RED CURB ex. "NO BICYCLE RIDINGON SIDEWALK" SIGN12" WHITE CROSSWALK N
LEGEND (SHEETS PD-1 TO PD-3 ONLY):INSTALL TYPE I ARROW PER CALTRANS STANDARD DRAWING A24A.INSTALL TYPE IV (R) ARROW PER CALTRANS STANDARD DRAWING A24A.INSTALL TYPE VII (L) ARROW PER CALTRANS STANDARD DRAWING A24A.EXISTING "STOP" PAVEMENT MARKINGINSTALL "STOP" PAVEMENT MARKINGINSTALL "ONLY" PAVEMENT MARKINGINSTALL ADA SYMBOL PER CALTRANS STANDARD DRAWING A24C.INSTALL NEW BICYCLE SHARROW PER CALTRANS STANDARD DRAWING A24C.INSTALL BIKE LANE SYMBOL WITH PERSON AND BIKE LANE ARROW PER CALTRANS STANDARD DRAWINGA24C AND A24A RESPECTIVELY.INSTALL BICYCLE LOOP DETECTOR SYMBOL PER CALTRANS STADARD DRAWING A24C.EXISTING STRIPE TO REMAINNEW STRIPEPAINT CURB AS INDICATED ON PLANSANGLE POINTEXISTING PARALLEL PARKING STALL MARKING.INSTALL PARALLEL PARKING STALL MARKING PER DETAIL G ON SHEET PD-7. CHANGE IN PAVEMENT DELINEATION DETAIL.APPLY A TWO-STEP SLURRY SEAL. ALL EXISTING STRIPING AND MARKINGS WITHIN THE LIMITS OF THE NEWPROPOSED SLURRY SEAL SHALL BE REMOVED BY MEANS OF GRINDING EXISTING STRIPING AND LEGENDSBEFORE SLURRY SEALING. FOR THE FIRST STEP, APPLY A TYPE III SLURRY WITH FIBER REINFORCEMENTDIRECTLY OVER THE EXISTING PAVEMENT. IN STEP TWO, APPLY A TYPE II SLURRY SEAL OVER THE APPLIEDTYPE III SLURRY PER CALTRANS SPECIFICATIONS SECTION 37-3. SLURRY SEAL SHALL BE 0.5 FEET FROM ANYEXISTING CROSSWALKS TO REMAIN PER DETAIL D ON SHEET PD-7.RELOCATE EQUIPMENTSTREET NAME SIGNSREMOVE AND SALVAGE EQUIPMENT. ALL SALVAGED EQUIPMENT SHALL BE RETURNED TO THE CITY OFMERCED PUBLIC WORKS DEPARTMENT.

PROJECT NOTES (SHEETS PD-1 TO PD-3 ONLY):1INSTALL 45° MOTORCYCLE PARKING STALL PER DETAIL H ON SHEET PD-7.INSTALL "MOTORCYCLE PARKING ONLY" SIGN ON A NEW STEEL POST.INSTALL 45° PARKING STALL PER DETAIL B ON SHEET PD-7.INSTALL 4" WHITE 45° DIAGONAL STRIPING AT 5' OFF CENTER AND A 4" WHITE BORDER PER DETAIL B ON SHEET PD-7.FURNISH AND INSTALL MODIFIED R3-8 SIGN. THROUGH-LEFT ARROW TO BE SHOWN ON LEFT SIDE OF SIGN. RIGHTARROW WITH "ONLY" BELOW ARROW TO BE SHOWN ON RIGHT. SEE DETAIL I FOR CONFIGURATION OF MODIFIED SIGN.FURNISH AND INSTALL R3-2 ON EXISTING ORNAMENTAL STREET LIGHT.FURNISH AND INSTALL D11-1 SIGN ON A NEW STEEL POST.INSTALL ADA PARKING STRIPING PER DETAIL E ON SHEET PD-7.FURNISH AND INSTALL R32 (CA) "30 MIN" SIGN ON A NEW STEEL POST.EXISTING R99 (CA) AND R99B (CA). R99 (CA), R99B (CA) SIGNS AND POST. THE EXISTING POST BASE SHALL BECOMPLETELY REMOVED AND EXISTING SURFACE PATCHED AS DIRECTED BY THE ENGINEER.ROTATE EXISTING R32 (CA) TO FACE PARKING STALLS.EXISTING R5-1 AND R5-1a. R5-1, R5-1a AND POST. THE EXISTING POST BASE SHALL BE COMPLETELY REMOVED ANDEXISTING SURFACE PATCHED AS DIRECTED BY THE ENGINEER.INSTALL 40° PARKING STALL PER DETAIL C ON SHEET PD-7.FURNISH AND INSTALL R5-1 AND R5-1A ON EXISTING STREET LIGHT.INSTALL 4" WHITE 40° DIAGONAL STRIPING AT 5' OFF CENTER AND A 4" WHITE BORDER PER DETAIL C ON SHEET PD-7.FURNISH AND INSTALL R3-1 ON STREET LIGHT POLE.EXISTING R99C (CA). R99C (CA) AND POST. THE EXISTING POST BASE SHALL BE COMPLETELY REMOVED ANDEXISTING SURFACE PATCHED AS DIRECTED BY THE ENGINEER.FURNISH AND INSTALL R3-2 SIGN BELOW R1-1 ON A NEW POST. PLACE EXISTING R1-1, W4-P AND SNS ON NEW POST.FURNISH AND INSTALL R3-1 SIGN BELOW R1-1 ON A NEW POST. PLACE EXISTING R1-1 AND W4-P ON NEW POST.FURNISH AND INSTALL R3-1 SIGN ON EXISTING SIGNAL MAST ARM.INSTALL ADA PARKING STRIPING PER DETAIL F ON SHEET PD-7.FURNISH AND INSTALL R3-2 SIGN ON EXISTING SIGNAL MAST ARM.FURNISH AND INSTALL D11-1 SIGN ON EXISTING ORNAMENTAL STREET LIGHT.

FURNISH AND INSTALL R4-11 SIGN ON EXISTING ORNAMENTAL STREET LIGHT.RESTRIPE CROSSWALK DIRECTLY OVER THE EXISTING CROSSWALK.FURNISH AND INSTALL R81 ON EXISTING ORNAMENTAL STREET LIGHT.REPOSITION EXISTING R99 (CA) AND R99B (CA) TO FACE PARKING STALLS.EXISTING R32 (CA). EXISTING R32 (CA) SIGN TO EXISTING ORNAMENTAL STREET LIGHT AS SHOWN ON PLANS.INSTALL 40° MOTORCYCLE PARKING STALL PER DETAIL A ON SHEET PD-7.EXISTING W11-2 AND W16-7P (L). W11-2 SIGN AND POST. W16-7P (L) SIGN. FURNISH AND INSTALL W16-7P(R) JUST BELOW THE EXISTING W11-2 SIGN. THE EXISTING POST BASE SHALL BE COMPLETELY REMOVED AND EXISTINGSURFACE PATCHED AS DIRECTED BY THE ENGINEER.INSTALL 40° PARKING STALL PER DETAIL K ON SHEET PD-7.INSTALL 45° PARKING STALL PER DETAIL L ON SHEET PD-7.INSTALL 4" WHITE 40° DIAGONAL STRIPING AT 5' OFF CENTER AND A 4" WHITE BORDER PER DETAIL K ON SHEET PD-7.INSTALL ADA PARKING STRIPING PER DETAIL J ON SHEET PD-7.INSTALL 45° MOTORCYCLE PARKING STALL PER DETAIL M ON SHEET PD-7.INSTALL 4" WHITE 45° DIAGONAL STRIPING AT 5' OFF CENTER AND A 4" WHITE BORDER PER DETAIL L ON SHEET PD-7.INSTALL 4" WHITE 45° DIAGONAL STRIPING AT 5' OFF CENTER.FURNISH AND INSTALL R32(CA) "2 HOUR PARKING 8 AM TO 5 PM MON-FRI".FURNISH AND INSTALL R99C (CA) SIGN ON A NEW STEEL POST.INSTALL ADA PARKING STRIPING PER DETAIL N ON SHEET PD-8.INSTALL ADA PARKING STRIPING PER DETAIL O ON SHEET PD-8.INSTALL ADA PARKING STRIPING PER DETAIL P ON SHEET PD-8.INSTALL ADA PARKING STRIPING PER DETAIL Q ON SHEET PD-8.FURNISH AND INSTALL R99C (CA) SIGN ON EXISTING ORNAMENTAL STREET LIGHT.INSTALL ADA PARKING STRIPING PER DETAIL R ON SHEET PD-8. 18TH STREET

N STREET

M STREET

CANAL STREET
18TH STREETK STREET

MLK JR WAY
Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSAENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING DEPARTMENT "Gateway to Yosemite"City of Merced
516 W. SHAW AVE., STE. 103FRESNO, CA 93704PHONE: (559) 570-8991 EMAIL: [email protected] BY:

PAVEMENT DELINEATIONDOWNTOWN MERCED CIRCULATIONPD-1R.C.E. 62971DATESCALE: 1"=40'040'80' SPECIAL NOTES:WHERE UNDERGROUND AND SURFACE STRUCTURES ARE SHOWN ONTHE PLANS, THE LOCATIONS ARE BELIEVED TO BE REASONABLYCORRECT BUT ARE NOT GUARANTEED. SUCH STRUCTURES ARE SHOWNFOR THE INFORMATION OF THE CONTRACTOR, BUT INFORMATION SOGIVEN IS NOT TO BE CONSTRUCTED AS A REPRESENTATION THAT SUCHSTRUCTURES WILL BE FOUND WHERE SHOWN, OR THAT THEYREPRESENT ALL THE STRUCTURES THAT MAY BE ENCOUNTERED.CONTRACTOR SHALL DETERMINE PRESENCE OF EXISTING FACILITIESAND SHALL NOTIFY THE ENGINEER OF POTENTIAL CONFLICTS.

GENERAL NOTES (SHEETS PD-1 TO PD-3 ONLY):1.WORK SHALL BE DONE IN ACCORDANCE WITH THE 2023 EDITION OF THE STATE OF CALIFORNIA DEPARTMENT OFTRANSPORTATION STANDARD PLANS AND SPECIFICATIONS, INCLUDING ALL REVISIONS WITH EXCEPTION TO RSPA20A, RSP A20B, RSP A20C, AND RSP A20D, DETAIL 1 THROUGH 32 SHALL USE 4" WIDE STRIPE, THE LATEST EDITIONOF THE 2014 CALIFORNIA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (2014 CALIFORNIA MUTCD), THE LATESTEDITION OF THE CITY OF MERCED STANDARD SPECIFICATIONS AND DRAWINGS, AND THE SPECIAL PROVISIONS.2.THESE PLANS ARE ACCURATE FOR SIGNING AND STRIPING ONLY.3.ALL SIGNS SHALL BE 3M-3930HIP TYPE III & IV SERIES REFLECTIVE SHEETING AND BE COVERED WITH 1160A PREMIUMOVERLAY ANTI-GRAFFITI FILM OR AVERY DENNISON T6500 SERIES REFLECTIVE SHEETING AND SHALL BE COVEREDWITH AVERY DENNISON OL1000ANTI-GRAFFITI OVERLAY FILM.4.ALL SALVAGED MATERIALS SHALL BE DELIVERED TO THE CITY OF MERCED CORPORATION YARD.5.EXISTING STRIPING, SYMBOLS, LEGENDS, AND MARKINGS TO BE REMOVED SHALL BE DONE BY WET SANDBLASTING.DRY SANDBLASTING MAY BE USED IN SELECTED AREAS ONLY WITH THE PERMISSION OF THE CITY TRAFFIC ENGINEERAND WITH THE APPROVAL OF THE AIR POLLUTION CONTROL DISTRICT. ALTERNATE METHODS OF REMOVAL REQUIREAPPROVAL OF THE CITY TRAFFIC ENGINEER. AFTER REMOVAL, SLURRY SEAL SHALL BE APPLIED TO THE AFFECTEDAREAS.6.WITH THE EXCEPTION OF BIKE LANE SYMBOLS, ALL STRIPING SHALL BE THERMOPLASTIC.7.ALL CROSSWALKS SHALL BE 12 FEET WIDE, OUTSIDE EDGE TO OUTSIDE EDGE.8.THE CONTRACTOR SHALL FURNISH AND INSTALL NEW TYPE K-1 (CA) MARKERS ON ALL MEDIAN ISLAND NOSES,UNLESS OTHERWISE NOTED ON THE PLAN.9.THE CONTRACTOR SHALL INSTALL DETAIL 26 (RETRO-REFLECTIVE PAVEMENT MARKERS) ALONG ALL RAISED MEDIANS,AS PER 2014 CALIFORNIA MUTCD.10.THE CONTRACTOR SHALL PAINT THE RADII OF ALL RAISED MEDIAN ISLAND NOSES WITH TWO COATS OF YELLOWTRAFFIC PAINT WITH RETRO REFLECTIVE GLASS BEADS, UNLESS OTHERWISE NOTED ON THE PLAN.11.ALL PAVEMENT MARKINGS, MARKERS, TRAFFIC LINES AND SIGNS SHALL CONFORM TO 2023 CALTRANS STANDARDPLANS AND THE LATEST EDITION OF THE CALIFORNIA MUTCD. ALL SIGNS SHALL MEET THE MINIMUM STANDARDSFOR RETROREFLECTIVITY. IF ANY EXISTING MARKINGS, MARKERS & TRAFFIC LINES CONFLICT WITH THE NEW/FINALCONFIGURATION, THE CITY SHALL BE NOTIFIED IMMEDIATELY. ALL EXISTING PAVEMENT SURFACES SHALL BECLEANED PRIOR TO PAINTING OR PLACEMENT OF MARKERS. ALL PAVEMENT MARKINGS, ARROWS, WORDS,CROSSWALKS AND TRAFFIC LINES SHALL BE THERMOPLASTIC UNLESS NOTED OTHERWISE. 2 3
3 3
4 32
5 444
67 9
8 8
9RL1011RL12RLSNS 1314151617RL18
PROJECT NOTES (CONTINUED) (SHEETS PD-1 TO PD-3 ONLY):2425 25363636222221
11 2627RL282930RLRS
RS 2424
2424 24 24252525
313233343536
32 35
35 PAINT 13.5' OF RED CURB
37 3838
38 193940 204142 21434445 2223
9/20/2024
34 10.0'20.0'

12.0'10.8'11.5'21.5'70' OF DETAIL 3870' OF DETAIL 3873' OF DETAIL 22

14.5'155' OF DETAIL 32PAINT 16' OF RED CURBPAINT 12' OF RED CURBPAINT 20' OF RED CURBPAINT 24' OF RED CURBPAINT 19' OF RED CURBPAINT 15' OF RED CURBPAINT 15' OF RED CURB PAINT 17' OF RED CURBPAINT 11' OF RED CURBPAINT 14' OF RED CURBPAINT 20' OF RED CURB

10.5'ex. R32 (CA) "2 HOUR"ex. R32 (CA) "2 HOUR"
ex. R28 (CA)ex. R3-7ex. R2-1 (30)ex. R32 (CA) "2 HOUR"ex. R32 (CA) "2 HOUR"ex. R32 (CA) "2 HOUR"ex. R32 (CA) "2 HOUR"ex. "NO BICYCLE RIDINGON SIDEWALK" signex. R2-1 (30) 70' OF DETAIL 9PAINT 12' OF RED CURB R3-7 (R) ex. red curbex. red curb
R4-11
R4-11
R4-11
R4-11
R4-11

10.7'

10.4'

19.5'

60.0'

12.3'ex. type q markerex. type q markerex. R1-1 & SNS
ex. R1-1
ex. R1-1
ex. R1-1
ex. SNS PAINT 24' OF RED CURBPAINT 16' OF RED CURBPAINT 27' OF RED CURBPAINT 49' OF RED CURBPAINT 30' OF BLUE CURBPAINT 30' OF RED CURBPAINT 29' OF RED CURB

60.0'

60.0'PAINT 9.5' OF RED CURB408.5' OF DETAIL 32254.5' OF DETAIL 32100' OF DETAIL 2218.0'

8.0'20.0'10.0'18.0'

8.0'

8.0'10.0'10.0'12.0'

8.0'

60.0' ex. R99 (CA)ex. R99B (CA)10.0'

60.0'
R4

28.5'R32 (CA) "2 HOUR)PAINT 22' OF RED CURB

27.5'R99C 70' OF DETAIL 22PAINT 34' OF BLUE CURBPAINT 36' OF BLUE CURB P
P
PAINT 46' OF RED CURBex. brick crosswalk12" WHITE CROSSWALK75' OF DETAIL 39203' OF DETAIL 39100' OF DETAIL 39A219' OF DETAIL 39165' OF DETAIL 3937' OF DETAIL 39PAINT 61' OF RED CURB PAINT 37' OF RED CURBPAINT 43' OF RED CURBPAINT 39' OF RED CURB

13.8'5.0'3.0'3.0'5.0'13.6'

3.0'5.0'3.0'5.0'14.0'

3.0'5.0'14.0' ex. brick crosswalk
R8 ex. W11-2ex. W16-7Pex. W11-2ex. W16-7P
ex. W11-2ex. W16-7Pex. W11-2ex. W16-7Pex. R32 (CA) "30 MIN" ex. "SKATEBOARDSROLLERBLADES OR SIMILARDEVICES ARE NOT ALLOWED" sign ex. W11-2ex. W16-7Pex. "NO BICYCLE RIDINGON SIDEWALK" signex. "NO BICYCLE RIDINGON SIDEWALK" signW11-2W16-7P R3-7 (R)
ex. red curbex. red curb
ex. green curbex. red curbex. red curbex. red curbex. red curb ex. green curbex. red curb
ex. red curbex. green curbex. red curbex. red curbex. red curbex. red curb ex. red curb
ex. red curbex. red curbex. red curb PAINT 19' OF RED CURBPAINT 10' OF RED CURBR3-2R5-1R5-1A ex. R32 (CA) "30 MIN"50' OF DETAIL 38

10.0'

10.0'

10.0' 50' OF DETAIL 2222.3'8.0'19.4'
R813.8'13.8'

12.0'75' OF DETAIL 39A25' OF DETAIL 39A88.5' OF DETAIL 39113.5' OF DETAIL 3978' OF DETAIL 39178' OF DETAIL 39100' OF DETAIL 39A65' OF DETAIL 39 R4PAINT 22' OF GREEN CURB
PAINT 38' OF BLUE CURB
R81 (CA)R81B (CA)R5-1R5-1A ex. R2-1 (10)ex. R2-1 (10)
R5

11.4'11.4'PAINT 28' OF GREEN CURBex. R32 (CA) "30 MIN"PAINT 14' OF BLUE CURB

14.7'

12.0'11.5'PAINT 12' OF BLUE CURB
SCALE: 1"=40'040'80'N
Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSAENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING DEPARTMENT "Gateway to Yosemite"City of Merced
516 W. SHAW AVE., STE. 103FRESNO, CA 93704PHONE: (559) 570-8991 EMAIL: [email protected] BY:

PAVEMENT DELINEATIONDOWNTOWN MERCED CIRCULATIONPD-2R.C.E. 62971DATE

MAIN STREETR STREET

Q STREET

P STREET

O STREET

N STREET

M STREET

MAIN STREET
82115
3345
10 SPECIAL NOTES:WHERE UNDERGROUND AND SURFACE STRUCTURES ARE SHOWN ONTHE PLANS, THE LOCATIONS ARE BELIEVED TO BE REASONABLYCORRECT BUT ARE NOT GUARANTEED. SUCH STRUCTURES ARE SHOWNFOR THE INFORMATION OF THE CONTRACTOR, BUT INFORMATION SOGIVEN IS NOT TO BE CONSTRUCTED AS A REPRESENTATION THAT SUCHSTRUCTURES WILL BE FOUND WHERE SHOWN, OR THAT THEYREPRESENT ALL THE STRUCTURES THAT MAY BE ENCOUNTERED.CONTRACTOR SHALL DETERMINE PRESENCE OF EXISTING FACILITIESAND SHALL NOTIFY THE ENGINEER OF POTENTIAL CONFLICTS. 13 3131313131 143316 333317 33333333 18192220 23
24 2323 2323 23
14 4029 392 6292292
8 30 30262630 25142 3933294139
9/20/2024
35 194' OF DETAIL 39202' OF DETAIL 39191' OF DETAIL 39178' OF DETAIL 39168' OF DETAIL 39PAINT 40' OF RED CURBPAINT 25' OF RED CURBPAINT 14' OF RED CURBPAINT 34' OF RED CURBPAINT 26' OF RED CURBPAINT 20' OF RED CURBPAINT 14' OF RED CURBPAINT 13' OF RED CURBPAINT 33' OF RED CURBPAINT 20' OF RED CURBPAINT 14' OF RED CURB

3.0'5.0'13.4'

3.0'5.0'14.1'3.0'5.0'11.2'

3.0'5.0'22.0'3.0'5.0'14.1'18.4' ex. brick crosswalkex. brick crosswalkex. brick crosswalk ex. R32 (CA) "30 MIN"ex. "NO BICYCLE RIDINGON SIDEWALK" sign ex. W11-2ex. W16-7Pex. "SKATEBOARDSROLLERBLADES OR SIMILARDEVICES ARE NOT ALLOWED" signex. R3-7 W11-2W16-7P ex. red curbex. red curb
ex. red curbex. red curbex. red curbex. red curbex. red curbex. red curb ex. red curbex. red curbex. red curbex. red curb
ex. red curbex. green curbex. red curbex. red curbex. green curbex. red curb ex. red curbex. red curb12" WHITE CROSSWALK

10.0'

10.0'

8.0'74' OF DETAIL 38
R4R10 100' OF DETAIL 39A78' OF DETAIL 39

19.6'60.0' ex. R32 (CA) "30 MIN"
ex. R32 (CA) "30 MIN"
ex. red curbex. red curb
R3-1R3-2R81 (CA)R81A (CA)10.0'19.6'74' OF DETAIL 2247' OF DETAIL 3912" WHITE CROSSWALKR5-1R5-1Aex. "NO BICYCLE RIDINGON SIDEWALK" signex. R5-6ex. R5-6 ex. R32 (CA) "30 MIN"ex. L-1 (CA)ex. L-1 (CA)

11.7'

13.7'PAINT 14' OF BLUE CURB

10.0'

10.0' PAINT 20' OF RED CURB

12.0'10.0'

12.9'12.9'14.4'ex. brick crosswalk12" WHITE CROSSWALKex. R100B (CA)ex. MERCED GUIDE SIGNex. R2-1 "30"ex. W11-2ex. W16-7Pex. R32 (CA) "3 HOUR"ex. R32 (CA) "3 HOUR"ex. R32 (CA)"3 HOUR"ex. R32 (CA) "3 HOUR"ex. W11-2ex. W16-7Pex. W11-2ex. W16-7Pex. R32 (CA)"3 HOUR"ex. R32 (CA) "30 MIN"ex. R32 (CA) "3 HOUR"ex. R32 (CA)"3 HOUR"ex. R2-1 "30" PAINT 16' OF RED CURBPAINT 56' OF RED CURB PAINT 8' OF RED CURBPAINT 17' OF RED CURBPAINT 25' OF RED CURB PAINT 22.5' OF RED CURB
ex. R1-1ex. R1-1
ex. R1-1 & SNSex. R1-1 & SNS12" WHITE CROSSWALK
PAINT 25' OF RED CURBPAINT 34.5' OF RED CURBPAINT 46' OF RED CURB PAINT 22' OF RED CURB
PAINT 20' OF RED CURBPAINT 11' OF RED CURBPAINT 10' OF RED CURBPAINT 46' OF RED CURBPAINT 20' OF RED CURBPAINT 55' OF RED CURBPAINT 43.5' OF BLUE CURBPAINT 27' OF RED CURB

10.0'8.0'8.0'

12.0'

8.0'8.0'20.0'10.0'

10.0'10.0'8.0'8.0'230' OF DETAIL 3270' OF DETAIL 2250' OF DETAIL 3898.5' OF DETAIL 29405.5' OF DETAIL 32206.5' OF DETAIL 3226' OF DETAIL 38100' OF DETAIL 22

10.0'60.0'10.2'PAINT 5.5' OF RED CURB
R10
R10PAINT 27' OF RED CURB
ex. blue curbPAINT 13' OF RED CURBPAINT 5' OF RED CURBPAINT 10' OF RED CURBPAINT 4' OF RED CURB

60.0'3.5'

60.0'

10.5'60.0'

60.0'10.0'R32 (CA) "3 HOUR"R32 (CA) "3 HOUR"
R10ex. R99 (CA)ex. R99B (CA)PAINT 30' OF BLUE CURB
ex. R99 (CA)ex. R99B (CA)26' OF DETAIL 2218.0'10.0'ex. "NO BICYCLE RIDINGON SIDEWALK" signex. W11-2ex. W16-7P

20.0'ex. R99 (CA)ex. R99B (CA)
SCALE: 1"=40'040'80'N
Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSAENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING DEPARTMENT "Gateway to Yosemite"City of Merced
516 W. SHAW AVE., STE. 103FRESNO, CA 93704PHONE: (559) 570-8991 EMAIL: [email protected] BY:

PAVEMENT DELINEATIONDOWNTOWN MERCED CIRCULATIONPD-3

CANAL STREETMAIN STREETMAIN STREETK STREET

MARTIN LUTHERKING JR WAY

I STREET

H STREET

G STREET
33 1515
R.C.E. 62971DATESPECIAL NOTES:WHERE UNDERGROUND AND SURFACE STRUCTURES ARE SHOWN ONTHE PLANS, THE LOCATIONS ARE BELIEVED TO BE REASONABLYCORRECT BUT ARE NOT GUARANTEED. SUCH STRUCTURES ARE SHOWNFOR THE INFORMATION OF THE CONTRACTOR, BUT INFORMATION SOGIVEN IS NOT TO BE CONSTRUCTED AS A REPRESENTATION THAT SUCHSTRUCTURES WILL BE FOUND WHERE SHOWN, OR THAT THEYREPRESENT ALL THE STRUCTURES THAT MAY BE ENCOUNTERED.CONTRACTOR SHALL DETERMINE PRESENCE OF EXISTING FACILITIESAND SHALL NOTIFY THE ENGINEER OF POTENTIAL CONFLICTS. 31313131
131313
333333333333
8 43921
2929 29222
52424
7 7 28 111111
11 8
1626263030

3.0'3.0'
SEE DETAIL N TORIGHT FOR SB RIGHTTURN LANE10.0'332ex. red curb1212ex. red curbR3-246.6' 237877
25 2525
42 14
1537

17.6'12.9'12.5'

12.5'
4443PAINT 10' OF BLUE CURB14.0'
9/20/2024
36 BUS
T
T
T
5 19.0'10.0'19.0'

19.0'10.0'19.0'

19.0'10.0'19.0'

19.0'10.0'19.0'

18.5'10.0'19.0'18.5'10.0'19.0'ex. R99Cex. R26(CA)5ex. R26(CA)5ex. R26(CA)ex. R26(CA)6ex. R32 (CA)"30 MIN"5ex. R26(CA)5ex. R26(CA) ex. W11-2 & W16-7Pex. R32D5
210 L.F.
36 L.F.119 L.F.
115 L.F.
106 L.F. 2 L.F.37 L.F.36 L.F.13 L.F.12 L.F.
20 L.F.
ex. R26(CA)5
ex. "SKATEBOARDSROLLERBLADES OR SIMILARDEVICES ARE NOT ALLOWED" sign ex. R1-1 & R1-3Pex. "NO BICYCLE RIDINGON SIDEWALK" signex. R1-1 & R1-3Pex. R1-1 & R1-3Pex. R1-1, R1-3P & SNS ex. red curbex. red curbex. red curbex. red curbex. red curbex. red curbex. red curb ex. R6-6ex. L-1 (CA)
TT TT
V
TT
T

23.0'25.0'

18.5'10.5'19.0'8.0'8.0'

19.0'10.0'18.5'

11.0'19.0'18.5'

19.0'10.5'18.5'

24.0'24.0'

13.0'12.0'12.0'11.0' ex. R32 (CA) "30 MIN'5ex. R32 (CA) "30 MIN"ex. R32 (CA) "30 MIN" 23 L.F.22 L.F.23 L.F.27 L.F.17 L.F.35 L.F. ex. R1-1 & R1-3Pex. R1-1 & R1-3Pex. R1-1 & R1-3Pex. R1-1 & R1-3Pex. R1-1 & R1-3P ex. R1-1, R1-3P & SNS
ex. neighborhoodwatch signex. R1-1, R1-3P & SNS
ex. R1-1 & R1-3P
ex. red curbex. R32 (CA) "30 MIN"
55 L.F.ex. R2-1 "30"10.0'ex. "NO BICYCLE RIDINGON SIDEWALK" SIGN LEGEND (SHEETS PD-4 TO PD-6 ONLY):EXISTING STOP PAVEMENT MARKINGEXISTING STRIPE TO REMAINEXISTING STRIPE TO BE REMOVEDEXISTING DELINEATION TO BE REMOVEDEXISTING PARALLEL PARKING STALL MARKINGSEXISTING PAVEMENT MARKING TO BE REMOVED PER GENERAL NOTE 5"STOP" PAVEMENT MARKING AREA TO BE REMOVEDTYPE 1 PAVEMENT MARKING AREA TO BE REMOVEDTYPE IV PAVEMENT MARKING AREA TO BE REMOVEDTYPE VI PAVEMENT MARKING AREA TO BE REMOVEDTYPE VII(R) PAVEMENT MARKING AREA TO BE REMOVEDTWO WAY PAVEMENT ARROWS AREA TO BE REMOVEDBIKE SHARROW MARKING AREA TO BE REMOVEDREMOVE AND SALVAGE EQUIPMENT. ALL SALVAGED EQUIPMENT SHALL BERETURNED TO THE CITY OF MERCED PUBLIC WORKS DEPARTMENT.RELOCATE EQUIPMENTSTREET NAME SIGNS PROJECT NOTES (SHEETS PD-4 TO PD-6 ONLY):1REMOVE EXISTING RED CURB PAINT.REMOVE EXISTING BLUE CURB PAINT.REMOVE EXISTING WHITE CURB PAINT.REMOVE EXISTING GREEN CURB PAINT. EXISTING SIGN(S) MOUNTED ON THE EXISTING ORNAMENTAL STREET LIGHT. EXISTING SIGN AND POST. THE EXISTING POST BASE SHALL BE COMPLETELYREMOVED AND EXISTING SURFACE PATCHED AS DIRECTED BY THE ENGINEER.EXISTING R99 (CA) AND R99B (CA). R99 (CA), R99B (CA) AND POST. THEEXISTING POST BASE SHALL BE COMPLETELY REMOVED AND EXISTING SURFACEPATCHED AS DIRECTED BY THE ENGINEER.REPOSITION EXISTING R99 (CA) AND R99B (CA) TO FACE PARKING STALLS.EXISTING MODIFIED W74 (CA) ON MAST ARM. TYPE 9 STANDARD POLE, 18'MAST ARM AND SIGN. COMPLETELY REMOVE OF AND DISPOSE OF THE POLEFOUNDATION. EXISTING SURFACE PATCHED AS DIRECTED BY THE ENGINEER.EXISTING R3-8a. EXISTING R3-8a SIGN MOUNTED ON MAST ARM.REMOVE EXISTING YELLOW CURB PAINT.EXISTING R99C (CA). R99C (CA) AND POST. THE EXISTING POST BASE SHALL BECOMPLETELY REMOVED AND EXISTING SURFACE PATCHED AS DIRECTED BY THEENGINEER. EXISTING SIGN MOUNTED ON THE EXISTING STREET LIGHT.EXISTING R1-1, W4-4P AND SNS. R1-1, SNS AND W4-4P TO NEW POST WITHNEW R3-2 SIGN. EXISTING POST. THE EXISTING POST BASE SHALL BECOMPLETELY REMOVED AND EXISTING SURFACE PATCHED AS DIRECTED BY THEENGINEER.

EXISTING R1-1 AND SNS. R1-1 AND SNS TO NEW POST WITH NEW R3-1 SIGN.EXISTING POST. THE EXISTING POST BASE SHALL BE COMPLETELY REMOVEDAND EXISTING SURFACE PATCHED AS DIRECTED BY THE ENGINEER.REPOSITION R32 (CA) TO FACE PARKING STALLS.EXISTING R32 (CA). EXISTING R32 (CA) SIGN MOUNTED ON THE EXISTINGSTREET LIGHT.EXISTING R32 (CA). POST AND SIGN. COMPLETELY REMOVE OF AND DISPOSEOF THE POLE FOUNDATION. EXISTING SURFACE PATCHED AS DIRECTED BY THEENGINEER.EXISTING R32 (CA). EXISTING R32 (CA) SIGN TO EXISTING ORNAMENTALSTREET LIGHT AS SHOWN ON PLANS.EXISTING W11-2 AND W16-7P (L). W11-2 SIGN AND POST. W16-7P (L)SIGN. FURNISH AND INSTALL W16-7P (R) JUST BELOW THE EXISTING W11-2 SIGN.THE EXISTING POST BASE SHALL BE COMPLETELY REMOVED AND EXISTINGSURFACE PATCHED AS DIRECTED BY THE ENGINEER.EXISTING BARRICADES, DELINEATOR POSTS, R5-1, R5-1A, R6-7 AND POSTS.ALL EXISTING BARRICADES, DELINEATOR POSTS, R5-1, R5-1A, R6-7 AND POSTS.EXISTING R5-1 AND R5-1a. R5-1, R5-1a AND POST. THE EXISTING POST BASESHALL BE COMPLETELY REMOVED AND EXISTING SURFACE PATCHED AS DIRECTEDBY THE ENGINEER.EXISTING DUAL MOUNTED W11-2, W16-7P AND POST. W11-2 AND W16-7PSIGNS FACING EASTBOUND TRAFFIC. W11-2 AND W16-7P SIGNS FACINGWESTBOUND TRAFFIC TO REMAIN. .

SCALE: 1"=40'040'80'
18TH STREET

N STREET
N
M STREET18TH STREETK STREET

MLK JR WAY
Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSAENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING DEPARTMENT "Gateway to Yosemite"City of Merced
516 W. SHAW AVE., STE. 103FRESNO, CA 93704PHONE: (559) 570-8991 EMAIL: [email protected] BY:

PAVEMENT DELINEATIONDEMOLITION PLANDOWNTOWN MERCED CIRCULATIONPD-4R.C.E. 62971DATE

CANAL STREET
11 11114 32
234
144111
1 5RS6RS
4 7'9'
9'7' 8"
8' 3"14'
7'20'
3' 3"9' 3" RL789RS10RSRLSNS
SPECIAL NOTES:WHERE UNDERGROUND AND SURFACE STRUCTURES ARE SHOWN ONTHE PLANS, THE LOCATIONS ARE BELIEVED TO BE REASONABLYCORRECT BUT ARE NOT GUARANTEED. SUCH STRUCTURES ARE SHOWNFOR THE INFORMATION OF THE CONTRACTOR, BUT INFORMATION SOGIVEN IS NOT TO BE CONSTRUCTED AS A REPRESENTATION THAT SUCHSTRUCTURES WILL BE FOUND WHERE SHOWN, OR THAT THEYREPRESENT ALL THE STRUCTURES THAT MAY BE ENCOUNTERED.CONTRACTOR SHALL DETERMINE PRESENCE OF EXISTING FACILITIESAND SHALL NOTIFY THE ENGINEER OF POTENTIAL CONFLICTS.

RL1213RS14
1516PROJECT NOTES (CONTINUED) (SHEETS PD-4 TO PD-6 ONLY):RSRLRS RSRL
15 L.F.
17RS18RS 1119RL
1 7'20'

4.5'11' 20RLRSRS2122RL23RS
9/20/2024
37 12.0'10.5'11.5'21.5'

18.0'10.5'9.5'18.0'

18.0'9.5'10.5'18.0'

17.5'10.0'10.0'18.0' 19 L.F.46 L.F.
40 L.F.
42 L.F.
ex. R99(CA)ex. R99B(CA)
ex. R32 (CA) "2 HOUR"ex. R32 (CA) "2 HOUR"
ex. R28 (CA)ex. R3-7ex. R2-1 (30)ex. R32 (CA) "2 HOUR"ex. R32 (CA) "2 HOUR"ex. R32 (CA) "2 HOUR"ex. R32 (CA) "2 HOUR"ex. "NO BICYCLE RIDINGON SIDEWALK" signex. W9-1ex. R2-1 (30) ex. red curb
ex. red curbex. type q markerex. type q markerex. R1-1 & SNS ex. R1-1
ex. R1-1
ex. R1-1
ex. SNS ex. R99 (CA)ex. R99B (CA)1755
P
4"3"P
ex. brick crosswalk
ex. brick crosswalk23.0'10.0'23.0'

12.5'10.0'13.5'

23.0'23.0'22.5'23.0'

9.0'11.0'14.0'

13.0'9.0'14.0'23.0'23.0'

22.5'22.5'

11.0'10.5'12.5'35.5'46.0' 45 L.F.52 L.F. 5ex. R99(CA)ex. R99B(CA)ex. W11-2ex. W16-7Pex. W11-2ex. W16-7P ex. W11-2ex. W16-7Pex. D11-15ex. R4-11ex. W11-2ex. W16-7Pex. R32 (CA) "30 MIN"ex. R4-116ex. D11-15 ex. D11-16ex. R4-116ex. "SKATEBOARDSROLLERBLADES OR SIMILARDEVICES ARE NOT ALLOWED" sign ex. W11-2ex. W16-7Pex. "NO BICYCLE RIDINGON SIDEWALK" signex. "NO BICYCLE RIDINGON SIDEWALK" signex. R4-116ex. D11-16 5ex. red curbex. red curb ex. green curbex. red curbex. red curbex. red curbex. red curb ex. green curbex. red curb
ex. red curbex. green curbex. red curbex. red curbex. red curbex. red curb22 L.F. ex. red curb
ex. red curbex. red curbex. red curb 14 L.F.114 L.F.121 L.F.116 L.F.9 L.F.1ex. R4-1169 L.F.ex. R3-5a& R6-66ex. R3-5a& R6-613 1514ex. R32 (CA) "30 MIN"ex. D11-16 21 L.F.4 L.F.1 5.5 L.F.124 L.F.44 202020 ex. R2-1 (10)ex. R2-1 (10)6ex. L-1 (CA)23 SCALE: 1"=40'040'80'N
Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSAENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING DEPARTMENT "Gateway to Yosemite"City of Merced
516 W. SHAW AVE., STE. 103FRESNO, CA 93704PHONE: (559) 570-8991 EMAIL: [email protected] BY:

PAVEMENT DELINEATIONDEMOLITION PLANDOWNTOWN MERCED CIRCULATIONPD-5

MAIN STREETR STREET

Q STREET

P STREET

O STREET

N STREET

M STREET

MAIN STREET
12 2
2 2
1 79
R.C.E. 62971DATESPECIAL NOTES:WHERE UNDERGROUND AND SURFACE STRUCTURES ARE SHOWN ONTHE PLANS, THE LOCATIONS ARE BELIEVED TO BE REASONABLYCORRECT BUT ARE NOT GUARANTEED. SUCH STRUCTURES ARE SHOWNFOR THE INFORMATION OF THE CONTRACTOR, BUT INFORMATION SOGIVEN IS NOT TO BE CONSTRUCTED AS A REPRESENTATION THAT SUCHSTRUCTURES WILL BE FOUND WHERE SHOWN, OR THAT THEYREPRESENT ALL THE STRUCTURES THAT MAY BE ENCOUNTERED.CONTRACTOR SHALL DETERMINE PRESENCE OF EXISTING FACILITIESAND SHALL NOTIFY THE ENGINEER OF POTENTIAL CONFLICTS. 111211 1616
9/20/2024
38 ex. brick crosswalkex. brick crosswalkex. brick crosswalk

44.0'

30.0'32.0'46.0'

46.0'32.0'16.0'16.0'23.0'23.0'

20.5'20.5'13.0'9.5'14.0'

12.0'11.0'10.5'22.5'6 L.F.
ex. R32 (CA) "30 MIN"ex. "NO BICYCLE RIDINGON SIDEWALK" signex. R3-5ex. R3-16ex. R4-11ex. D11-1ex. R3-5aex. R4-116ex. D11-16ex. W11-2ex. W16-7Pex. "SKATEBOARDSROLLERBLADES OR SIMILARDEVICES ARE NOT ALLOWED" signex. R4-11ex. D11-16ex. R3-7 ex. red curbex. red curb ex. red curbex. red curb
ex. red curbex. red curbex. red curbex. red curb
ex. red curbex. red curb
ex. red curbex. red curb
ex. red curbex. green curbex. red curbex. red curbex. green curbex. red curb ex. red curbex. red curb 510 L.F.115 L.F.15 L.F.16 10 L.F.1 8 L.F.1 ex. R32 (CA) "30 MIN"
ex. red curbex. red curb516 L.F.12 L.F.11
ex. R3-2,ex. R3-26 20202121ex. "NO BICYCLE RIDINGON SIDEWALK" signex. R5-6ex. R5-6 ex. R32 (CA) "30 MIN"ex. L-1 (CA)ex. L-1 (CA) ex. brick crosswalk

18.5'10.0'10.0'17.5'18.0'9.0'11.0'17.5'

17.5'10.0'10.5'17.5'21.0'14.0'21.0' 42 L.F.
44 L.F. ex. R100B (CA)ex. MERCED GUIDE SIGNex. R2-1 "30"ex. W11-2ex. W16-7Pex. R32 (CA) "3 HOUR"ex. R32 (CA) "3 HOUR"ex. R32 (CA)"3 HOUR"ex. R32 (CA) "3 HOUR"ex. W11-2ex. W16-7Pex. W11-2ex. W16-7Pex. R32 (CA)"3 HOUR"ex. W4-2ex. R32 (CA) "30 MIN"ex. R32 (CA) "3 HOUR"ex. R32 (CA)"3 HOUR"ex. R2-1 "30" ex. R1-1ex. R1-1 ex. R1-1 & SNSex. R1-1 & SNS
ex. blue curb17171817 17 ex. R99 (CA)ex. R99B (CA)
ex. R99 (CA)ex. R99B (CA)
6 ex. W9-16
ex. "NO BICYCLE RIDINGON SIDEWALK" signex. W11-2ex. W16-7Pex. R99 (CA)ex. R99B (CA) SCALE: 1"=40'040'80'N
Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSAENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING DEPARTMENT "Gateway to Yosemite"City of Merced
516 W. SHAW AVE., STE. 103FRESNO, CA 93704PHONE: (559) 570-8991 EMAIL: [email protected] BY:

PAVEMENT DELINEATIONDEMOLITION PLANDOWNTOWN MERCED CIRCULATIONPD-6

CANAL STREETMAIN STREETMAIN STREETK STREET

MARTIN LUTHERKING JR WAY

I STREET

H STREET
G STREET22
4 8
2222
R.C.E. 62971DATESPECIAL NOTES:WHERE UNDERGROUND AND SURFACE STRUCTURES ARE SHOWN ONTHE PLANS, THE LOCATIONS ARE BELIEVED TO BE REASONABLYCORRECT BUT ARE NOT GUARANTEED. SUCH STRUCTURES ARE SHOWNFOR THE INFORMATION OF THE CONTRACTOR, BUT INFORMATION SOGIVEN IS NOT TO BE CONSTRUCTED AS A REPRESENTATION THAT SUCHSTRUCTURES WILL BE FOUND WHERE SHOWN, OR THAT THEYREPRESENT ALL THE STRUCTURES THAT MAY BE ENCOUNTERED.CONTRACTOR SHALL DETERMINE PRESENCE OF EXISTING FACILITIESAND SHALL NOTIFY THE ENGINEER OF POTENTIAL CONFLICTS. 16 1019
9/20/2024
39 GUTTER LIP
Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSAENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING DEPART0ENT "Gateway to Yosemite"City of Merced
516 W. SHAW AVE., STE. 103FRESNO, CA 93704PHONE: (559) 570-8991 EMAIL: [email protected] BY:

PAVEMENT DELINEATIONDOWNTOWN MERCED CIRCULATIONDETAILSPD-7R.C.E. 62971DATE

16.75'9.0'20.75'FACE OF CURBGUTTER LIPX'5.0'45°45°0.5' TYPCROSSWALK /LIMIT LINETWO STEPSLURRY SEAL FACE OF CURBGUTTER LIP8.0'22.0'1' (TYP)1' (TYP)16.0'9.0'22.75'FACE OF CURBGUTTER LIPX'5.0'45°40°

16.0'8.0'FACE OF CURBGUTTER LIP22.75'3.0'40°'9.0'

22.0'3.0'5.0'8.0'FACE OF CURBGUTTER LIP30"36"16.75'5.0'20.75'FACE OF CURBGUTTER LIPX'5.0'45°45°

FACE OF CURB

16.75'9.0'20.75'FACE OF CURBGUTTER LIPX'5.0'45°45°16.0'9.0'22.75'FACE OF CURBGUTTER LIPX'5.0'45°40°16.0'8.0'FACE OF CURBGUTTER LIP22.75'3.0'40°'9.0'

16.0'5.0'22.75'FACE OF CURBGUTTER LIPX'5.0'45°40°

16.75'5.0'20.75'FACE OF CURBGUTTER LIPX'5.0'45°45°
4" WHITE STRIPEDIAGONALS4" WHITE STRIPEDIAGONALS4" WHITE STRIPEDIAGONALS4" BLUE STRIPEBORDER 4" BLUE STRIPEBORDER4" BLUE STRIPEBORDER
9/20/2024
40 Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSAENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING DEPART0ENT "Gateway to Yosemite"City of Merced
516 W. SHAW AVE., STE. 103FRESNO, CA 93704PHONE: (559) 570-8991 EMAIL: [email protected] BY:

PAVEMENT DELINEATIONDOWNTOWN MERCED CIRCULATIONDETAILSPD-8R.C.E. 62971DATE

5.0'3.5'GUTTER LIPCLASS 1 DELINEATORS
FACE OF CURB25.6'5.0'3.0'40°16.5'5.0'9.0'1.0'5.0'2.0'2.0'5.0'5.0'16.4'2.9'GUTTER LIPCLASS 1 DELINEATORS3.0'1.0'5.0'9.0'25.5'0.9'0.9'FACE OF CURB

FACE OF CURBGUTTER LIP
CLASS 1 DELINEATORS5.0'1.8'1.8'1.0'3.0'5.0'9.0'5.0'7.0'16.7'23.5'45°5.0'3.7'GUTTER LIP CLASS 1 DELINEATORS
FACE OF CURB25.6'3.0'40°16.5'5.0'9.0'5.0'5.0'1.0'0.75'0.75'40° 4" BLUE STRIPEBORDEREXISTING ADA RAMP4" WHITE STRIPEDIAGONALS 4" BLUE STRIPEBORDER4" WHITE STRIPEDIAGONALS4" WHITE STRIPEDIAGONALS4" BLUE STRIPEBORDER4" BLUE STRIPEBORDER4" WHITE STRIPE4" BLUE STRIPEBORDER 4" BLUE STRIPEBORDER4" BLUE STRIPE BORDER4" WHITE STRIPEDIAGONALS4" BLUE STRIPEBORDER4" BLUE STRIPEBORDER4" BLUE STRIPE BORDER4" WHITE STRIPE 4" BLUE STRIPE BORDER4" BLUE STRIPEBORDER4" WHITE STRIPE

22.0'3.0'5.0'8.0'FACE OF CURBGUTTER LIP4" WHITE STRIPEDIAGONALS4" BLUE STRIPEBORDER9/20/2024 41 V
PP
21 3345637667
R.C.E. 62971DATEN
CONSTRUCTION NOTES (THIS SHEET ONLY):1EXISTING 170 CONTROLLER IN 336 CABINET WITH BBS.TO EXISTING SERVICE ENCLOSURE AT ALLEY BETWEEN 16TH AND MAIN STREET.REMOVE AND SALVAGE EXISTING SIGNAL HEAD AND MOUNTING HARDWARE.REMOVE AND SALVAGE EXISTING SIGNAL MAST ARM AND STREET NAME SIGNAND MOUNTING HARDWARE FROM MAST ARM POLE.INSTALL SIGNAL MAST ARM CONNECTION COVER PLATE ONCE SIGNAL MASTARM HAS BEEN REMOVED.REMOVE VEHICLE PHASE 4 CONDUCTORS WHICH WOULD NO LONGER BE INUSE AS A RESULT OF PHASE 4 VEHICLE HEADS BEING REMOVED.MODIFY THE EXISTING SV-2-T MOUNTING BRACKET AS NEEDED. FURNISH ANDINSTALL GALVANIZED PIPE PLUGS ON THE MODIFIED MOUNTING BRACKET.2 SCALE: 1" = 20'020'40'
Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSAENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING DEPART0ENT "Gateway to Yosemite"City of Merced
---- - -------- 516 W. SHAW AVE., STE. 103FRESNO, CA 93704PHONE: (559) 570-8991 EMAIL: [email protected]

MERCED CIRCULATION IMPROVEMENTS
LEGEND:CENTER LINESECTION LINEEXISTING RIGHT OF WAYEXISTING PULL BOXEXISTING CONTROLLER CABINETR/W E-1
345
Ø2PØ2Ø4PØ2Ø2Ø2Ø2Ø2P
Ø2PØ4PØ4Ø4Ø4Ø4PØ4PØ4Ø4Ø4Ø2P
67 Ø2
9/20/2024
42 P
R.C.E. 62971DATEN
CONSTRUCTION NOTES (THIS SHEET ONLY):1EXISTING 170 E CONTROLLER ON CABINET MOUNTED TO 1-A POLE.TO EXISTING SERVICE ENCOLSURE.REMOVE AND SALVAGE EXISTING SIGNAL HEAD AND MOUNTING HARDWARE.REMOVE AND SALVAGE EXISTING SIGNAL MAST ARM AND STREET NAME SIGNAND MOUNTING HARDWARE FROM MAST ARM POLE.INSTALL SIGNAL MAST ARM CONNECTION COVER PLATE ONCE SIGNAL MASTARM HAS BEEN REMOVED.REMOVE VEHICLE PHASE 4 CONDUCTORS WHICH WOULD NO LONGER BE INUSE AS A RESULT OF PHASE 4 VEHICLE HEADS BEING REMOVED.MODIFY THE EXISTING TV-2-T MOUNTING BRACKET AS NEEDED. FURNISH ANDINSTALL GALVANIZED PIPE PLUGS ON THE MODIFIED MOUNTING BRACKET.2 SCALE: 1" = 20'020'40'
2 345
Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSAENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING DEPART0ENT "Gateway to Yosemite"City of Merced
---- - -------- 516 W. SHAW AVE., STE. 103FRESNO, CA 93704PHONE: (559) 570-8991 EMAIL: [email protected]

MERCED CIRCULATION IMPROVEMENTS
LEGEND:CENTER LINESECTION LINEEXISTING RIGHT OF WAYEXISTING CONTROLLER CABINETEXISTING PULL BOXR/W

SEE DETAIL A FORCONTROLLER CABINETLOCATION
1 345
3 Ø4PØ2PØ4Ø4Ø4PØ2P
Ø2PØ2
Ø4PØ2PØ2
Ø2Ø4Ø4 Ø4
Ø4Ø2Ø4P
Ø4PØ2PØ2Ø4
67 63
677
E-29/20/2024
43 BUS4I8L418L4I8L418L4I8L4I8L4I8U4I8U2I3L2I3L2I3L2I3L2I3L2I3L2I3U2I3U4I7U4I7U4I7L4I7L4I7L4I7L4I7L4I7L 2I4U2I4U2I4L2I4L2I4L2I4L2I4L2I4L
R.C.E. 62971DATEN
CONSTRUCTION NOTES (THIS SHEET ONLY):1EXISTING 170 E CONTROLLER IN 332L CABINET WITH BBS.EXISTING SERVICE ENCLOSURE TO REMAIN.TO EXISTING ADVANCE LOOP DETECTIONEXISTING DETECTOR HANDHOLE.REMOVE AND SALVAGE EXISTING SIGNAL HEAD AND MOUNTING HARDWARE.REMOVE AND SALVAGE EXISTING SIGNAL MAST ARM AND STREET NAME SIGNAND MOUNTING HARDWARE FROM MAST ARM POLE.INSTALL SIGNAL MAST ARM CONNECTION COVER PLATE ONCE SIGNAL MASTARM HAS BEEN REMOVED.ABANDON EXISTING EQUIPMENT IN PLACE.DISCONNECT 2I3L AND 2I3U DLC'S AND NEATLY COIL DLC CABLES INSIDECABINET.UNSPLICE 2I4U AND 2I4L DLC'S FROM LOOP WIRE. THEN SPLICE NEW 2I4U AND2I4L LOOPS.REMOVE VEHICLE PHASE 2 CONDUCTORS WHICH WOULD NO LONGER BE INUSE AS A RESULT OF PHASE 2 VEHICLE HEADS BEING REMOVED.MODIFY THE EXISTING SV-2-T MOUNTING BRACKET AS NEEDED. FURNISH ANDINSTALL GALVANIZED PIPE PLUGS ON THE MODIFIED MOUNTING BRACKET.ABANDON EXISTING TYPE A LOOP DETECTOR IN PLACE AND INSTALL A NEWTYPE A LOOP DETECTOR PER STATE STANDARD PLAN ES-5B.ABANDON EXISTING TYPE D LOOP DETECTOR IN PLACE AND INSTALL A NEWTYPE D LOOP DETECTOR PER STATE STANDARD PLAN ES-5B.

SCALE: 1" = 20'020'40'
Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSAENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING DEPART0ENT "Gateway to Yosemite"City of Merced
---- - -------- 516 W. SHAW AVE., STE. 103FRESNO, CA 93704PHONE: (559) 570-8991 EMAIL: [email protected]

MERCED CIRCULATION IMPROVEMENTS
3 4844
3 LEGEND:
5 CENTER LINESECTION LINEEXISTING RIGHT OF WAYEXISTING PULL BOXEXISTING CONTROLLER CABINETEXISTING SERVICE CABINETEXISTING TYPE A LOOP DETECTOREXISITNG TYPE D LOOP DETECTOREXISTING APS POSTTYPE A LOOP DETECTOR CONFIGURATION PER STATE STANDARD PLAN ES-5B. LOOP SEALANTSHALL BE STATE APPROVED ELASTOMERIC SEALANT OR HOT MELT RUBBERIZED.TYPE D LOOP DETECTOR CONFIGURATION PER STATE STANDARD PLAN ES-5B. LOOP SEALANTSHALL BE STATE APPROVED ELASTOMERIC SEALANT OR HOT MELT RUBBERIZED. BICYCLEDETECTOR SYMBOL TO BE INSTALLED ON CENTER OF THE DETECTOR.ABANDON. IF APPLIED TO CONDUIT, REMOVE CONDUCTORS.

R/W
88888
1 2
2 34567
7 AB
Ø2PØ4PØ2Ø2P
Ø2PØ2Ø2Ø2Ø2PSEE DETAIL A FORCONTROLLERCABINET LOCATIONØ4PØ4PØ4PØ2P 8 65
119
10 91011
118APS Ø4APS Ø2
APS Ø4APS Ø2
APS Ø4APS Ø2APS Ø4APS Ø2
12 12
E-3
Ø2Ø4Ø4Ø2Ø4Ø2Ø2Ø4Ø4Ø481314
1314
9/20/2024
44 R.C.E. 62971DATEN
CONSTRUCTION NOTES (THIS SHEET ONLY):1EXISTING 170 E CONTROLLER IN TYPE 336 CABINET WITH BBS.TO EXISTING SERVICE ENCLOSURE AT ALLEY BETWEEN 16TH STREET AND MAINSTREET.TO 18TH STREET AT CANAL SIGNAL CABINET.TO PREVIOUSLY ABANDONED FIRE PRE-EMPTION SYSTEM.REMOVE AND SALVAGE EXISTING SIGNAL HEAD AND MOUNTING HARDWARE.REMOVE AND SALVAGE EXISTING SIGNAL MAST ARM AND STREET NAME SIGNAND MOUNTING HARDWARE FROM MAST ARM POLE.INSTALL SIGNAL MAST ARM CONNECTION COVER PLATE ONCE SIGNAL MASTARM HAS BEEN REMOVED.MODIFY THE EXISTING SV-2-T MOUNTING BRACKET AS NEEDED. FURNISH ANDINSTALL GALVANIZED PIPE PLUGS ON THE MODIFIED MOUNTING BRACKET.FURNISH AND INSTALL TYPE 1-A GALVANIZED POLE CAP. PRIOR TO ORDERINGCAP, CONTRACTOR SHALL VERIFY SIZE OF CAP NEEDED.REMOVE VEHICLE PHASE 2 CONDUCTORS WHICH WOULD NO LONGER BE INUSE AS A RESULT OF PHASE 2 VEHICLE HEADS BEING REMOVED.COORDINATE WITH THE CITY OF MERCED TO REMOVE THE SIGNAL FROMALL-RED FLASH OPERATION TO NORMAL OPERATION. 234
SCALE: 1" = 20'020'40'
43 125567
Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSAENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING DEPART0ENT "Gateway to Yosemite"City of Merced
---- - -------- 516 W. SHAW AVE., STE. 103FRESNO, CA 93704PHONE: (559) 570-8991 EMAIL: [email protected]

MERCED CIRCULATION IMPROVEMENTS
LEGEND:CENTER LINESECTION LINEEXISTING RIGHT OF WAYEXISTING PULL BOXEXISTING CONTROLLER CABINETR/W567 Ø2Ø2Ø2Ø4Ø4PØ4PØ4Ø2PØ2PØ2Ø4P58
8910
1010910
E-4
Ø2Ø2
11 9/20/2024
45 R.C.E. 62971DATEN
CONSTRUCTION NOTES (THIS SHEET ONLY):1EXISTING 170E CONTROLLER IN 336 CABINET WITH BBS.EXISTING SERVICE ENCLOSURE.TO POINT OF SERVICE LOCATION.TO PREVIOUSLY ABANDONED FIRE PREEMPTION SYSTEM.EXISTING CONDUIT TO UNKNOWN SYSTEM.REMOVE AND SALVAGE EXISTING SIGNAL HEAD AND MOUNTING HARDWARE.REMOVE AND SALVAGE EXISTING SIGNAL MAST ARM AND STREET NAME SIGNCOMPLETE WITH MOUNTING HARDWARE FROM MAST ARM POLE.INSTALL SIGNAL MAST ARM CONNECTION COVER PLATE ONCE SIGNAL MASTARM HAS BEEN REMOVED.REMOVE VEHICLE PHASE 2 CONDUCTORS WHICH WOULD NO LONGER BE INUSE AS A RESULT OF PHASE 2 VEHICLE HEADS BEING REMOVED.MODIFY THE EXISTING SV-2-T MOUNTING BRACKET AS NEEDED. FURNISH ANDINSTALL GALVANIZED PIPE PLUGS ON THE MODIFIED MOUNTING BRACKET.23 SCALE: 1" = 20'020'40' Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSAENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING DEPART0ENT "Gateway to Yosemite"City of Merced
---- - -------- 516 W. SHAW AVE., STE. 103FRESNO, CA 93704PHONE: (559) 570-8991 EMAIL: [email protected]

MERCED CIRCULATION IMPROVEMENTS
4 5
3 6
LEGEND:CENTER LINESECTION LINEEXISTING RIGHT OF WAYEXISTING PULL BOXEXISTING CONTROLLER CABINET WITH BBSEXISTING SERVICE CABINETR/W45 21 678
8 Ø2Ø2Ø4Ø4PØ2P
Ø2Ø2Ø4Ø4Ø4Ø4Ø2Ø2Ø4PØ2PØ2P

SEE DETAIL A FORCONTROLLER CABINETLOCATION
Ø4PØ4PØ2PØ2PØ2Ø2Ø4Ø4P
9 10
910
766109
E-5
Ø4
9/20/2024
46 ex. R32 (CA) "30 MIN"
R.C.E. 62971DATEN
CONSTRUCTION NOTES (THIS SHEET ONLY):1EXISTING 170E CONTROLLER IN TYPE 336 CABINET WITH BBS.TO SERVICE PANEL AT MAIN STREET AND "K" STREET.REMOVE AND SALVAGE EXISTING SIGNAL HEAD AND MOUNTING HARDWARE.REMOVE AND SALVAGE EXISTING SIGNAL MAST ARM AND STREET NAME SIGNAND MOUNTING HARDWARE FROM MAST ARM POLE.INSTALL SIGNAL MAST ARM CONNECTION COVER PLATE ONCE SIGNAL MASTARM HAS BEEN REMOVED.REMOVE VEHICLE PHASE 4 CONDUCTORS WHICH WOULD NO LONGER BE INUSE AS A RESULT OF PHASE 4 VEHICLE HEADS BEING REMOVED.MODIFY THE EXISTING SV-2-T MOUNTING BRACKET AS NEEDED. FURNISH ANDINSTALL GALVANIZED PIPE PLUGS ON THE MODIFIED MOUNTING BRACKET.MODIFY THE EXISTING TV-2-T MOUNTING BRACKET AS NEEDED. FURNISH ANDINSTALL GALVANIZED PIPE PLUGS ON THE MODIFIED MOUNTING BRACKET.2 SCALE: 1" = 20'020'40'
23 Call : TOLL FREEYOU DIGBEFORETWO DAYSnderground ervice lert1 ( 800 ) 227 - 2600USAUSAENGINEERING PROJECTS AND STANDARDS678 W. 18th Street (209) 385-6846ENGINEERING DEPART0ENT "Gateway to Yosemite"City of Merced
---- - -------- 516 W. SHAW AVE., STE. 103FRESNO, CA 93704PHONE: (559) 570-8991 EMAIL: [email protected]

MERCED CIRCULATION IMPROVEMENTS
LEGEND:CENTER LINESECTION LINEEXISTING RIGHT OF WAYEXISTING PULL BOXEXISTING CONTROLLER CABINETEXISTING WIRELESS ANTENNAR/W 1 345
5Ø4P
Ø4PØ4PØ2PØ2P
Ø2P
Ø2P
Ø4Ø4Ø2
Ø2Ø2Ø2Ø2Ø4Ø4Ø4Ø4

SEE DETAIL A FORCONTROLLERCABINET LOCATION
Ø2Ø4
Ø4PØ4Ø4Ø2Ø4PØ2P
6 833746
678
E-69/20/2024
47 EXHIBIT “C” – SPECIAL CONDITIONS

ARTICLE 1 BONDS
Within ten (10) calendar days from the date the Contractor is notified of award of the Contract, the Contractor shall deliver to the City four identical counterparts of the Performance Bond and Payment Bond on the forms supplied by the City and included as Exhibit “F” to the Contract. Failure to do so may, in the sole discretion of City, result in the forfeiture of Contractor’s bid security. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the City. The Performance Bond and the Payment Bond shall be for one hundred percent (100%) of the Total Contract Price.

48 U.S. DEPARTMENT OF THE TREASURY

CORONAVIRUS STATE FISCAL RECOVERY FUND

AWARD TERMS AND CONDITIONS

1 Use of Funds

a. Recipient understands and agrees that the funds disbursed under this award may only be used in compliance with sections 602(c) and 603(c) of the Social Security Act (the Act) and Treasury’s regulations implementing that section arid guidance.
b. Recipient will determine prior to engaging in any project using this assistance that it has the institutional, managerial, and financial capability to ensure proper planning, management, and completion of such project.

2 Period of Performance The period of performance for this award begins on the date hereof and ends on December 31, 2026. As set forth in Treasury’s implementing regulations, Recipient may use award funds to cover eligible costs incurred during the period that begins on March 5, 2021 and ends on December 31, 2024.

3 Reporting. Recipient agrees to comply with any reporting obligations established by Treasury, as it relates to this award.

4. Maintenance of and Access to Records
a, Recipient shall maintain records and financial documents sufficient to evidence compliance with sections 602(c) and 603(c), Treasury’s regulations implementing those sections, and guidance regarding the eligible uses of funds. b. The Treasury Office of Inspector General and the Government Accountability Office, or their authorized representatives, shall have the right of access to records (electronic and otherwise) of Recipient in order to conduct audits or other investigations.
c. Records shall be maintained by Recipient for a period of five (5) years after all funds have been expended or returned to Treasury, whichever is later.

5. Pre-award Costs Pre-award costs, as defined in 2 C.F.R. § 200.458, may not be paid with funding from this award

6. Administrative Costs. Recipient may use funds provided under this award to cover both direct and indirect costs.

7. Cost Sharing Cost sharing or matching funds are not required to be provided by Recipient.

8. Conflicts of Interest Recipient understands and agrees it must maintain a confli ct of interest policy consistent with 2 C.F.R. § 200.318(c) and that such conflict of interest policy is applicable to each activity funded under this award. Recipient and subrecipients must disclose in writing to Treasury or the pass-through entity, as appropriate, any potential conflict of interest affecting the awarded funds in accordance with 2 C.F.R. § 200.112.

9 Compliance with Applicable Law and Regulations.

a. Recipient agrees to comply with the requirements of sections 602 and 603 of the Act, regulations adopted by Treasury pursuant to sections 602(I) and 603(I) of the Act, and guidance issued by Treasury regarding the foregoing.

Recipient also agrees to comply with all other applicable federal statutes, regulations, and executive orders, and Recipient shall provide for such compliance by other parties in any agreements it enters into with other parties relating to this award.
b. Federal regulations applicable to this award include, without limitation, the following:
i. Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, 2 C.F.R. Part 200, other than such provisions as Treasury may determine are inapplicable to this Award and subject to such exceptions as may be otherwise provided by Treasury. Subpart F Audit Requirements of the Uniform Guidance, implementing the Single Audit Act, shall apply to this award. ii. Universal Identifier and System for Award Management (SAM), 2 C.F,R. Part 25, pursuant to which the award term set forth in Appendix A to 2 C.F.R. Part 25 is hereby incorporated by reference. iii. Reporting Subaward and Executive Compensation Information, 2 C.F.R. Part 170, pursuant to which the 49 award term set forth in Appendix A to 2 C.F.R. Part 170 is hereby incorporated by reference. iv. OMB Guidelines to Agencies on Governmentwide Debarment and Suspension (Nonprocurement), 2 C.F.R.

Pan 180, including the requirement to include a term or condition in all lower tier covered transactions (contracts and subcontracts described in 2 C.F.R. Part 180, subpart B) that the award is subject to 2 C.F.R.

Part 180 and Treasury’s implementing regulation at 3 l C.F.R. Pan 19. v. Recipient Integrity and Performance Matters, pursuant to which the award term set forth in 2 C.F.R. Part 200, Appendix XII to Part 200 is hereby incorporated by reference. vi. Governmentwide Requirements for Drug-Free Workplace, 31 C.F.R. Part 20. vii. New Restrictions on Lobbying, 3 I C.F, R. Part 21, viii. Uniform Relocation Assistance and Real Property Acquisitions Act of 1970 (42 U.S.C. §§ 4601- 4655) and implementing regulations.
ix. Generally applicable federal environmental laws and regulations. c. Statutes and regulations prohibiting discrimination applicable to this award, include, without limitation, the following:
i. Title VI of the Civil Rights Act of 1964 (42 U.S.C. §§ 2000d et seq.) and Treasury’s implementing regulations at 31 C.F.R. Part 22, which prohibit discrimination on the basis of race, color, or national origin under programs or activities receiving federal financial assistance;
ii. The Fair Housing Act, Title VIII of the Civil Rights Act of 1568 (42 U.S.C. §§ 3601 et seq.), which prohibits discrimination in housing on the basis of race, color, religion, national origin, sex, familial status, or disability.
iii. Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. § 794), which prohibits discrimination on the basis of disability under any program or activity receiving federal financial assistance; iv. The Age Discrimination Act of 1975, as amended (42 U.S.C. §§ 6101 et seq.), and Treasury’s implementing regulations at 31 C.F.R. Part 23, which prohibit discrimination on the basis of age in programs or activities receiving federal financial assistance; and v. Title II of the Americans with Disabilities Act of 1990, as amended (42 U.S.C. §§ 12101 et seq.), which prohibits discrimination on the basis of disability under programs, activities, and services provided or made available by state and local governments or instrumentalities or agencies thereto.

10 Remedial Actions In the event of Recipient’s noncompliance with sections 602 and 603 of the Act, other applicable Jaws, Treasury’s implementing regulations, guidance, or any reporting or other program requirements, Treasury may impose additional conditions on the receipt of a subsequent tranche of future award funds, if any, or take other available remedies as set forth its 2 C.F.R. § 200.339. In the case of a violation of sections 602(c) or 603(c) of the Act regarding the use of funds, previous payments shall be subject to recoupment as provided in sections 602(e) and 603(e) of the Act,

11 Hatch Act Recipient agrees to comply, as applicable, with requirements of the Hatch Act (5 U.S.C. §§ 1501 -1508 and 7324-7328), which limit certain political activities of State or local government employees whose principal employment is in connection with an activity financed in whole or in part by this federal assistance.

12 False Statements Recipient understands that making false statements or claims in connection with this award is a violation of federal law and may result in criminal, civil, or administrative sanctions, including fines, imprisonment, civil damages and penalties, debarment from participating in federal awards or contracts, and/or any other remedy available by law.

13 Publications Any publications produced with funds from this award must display the following language: “This project [is being] [was] supported, in whole or in part, by federal award number [enter project FAJN] awarded to City of Merced by the U.S. Department of the Treasury.”

14 Debts Owed the Federal Government

a. Any funds paid to Recipient (1) in excess of the amount to which Recipient is finally determined to be authorized to retain under the terms of this award; (2) that are determined by the Treasury Office of Inspector General to have been misused; or (3) that are determined by Treasury to be subject to a repayment obligation pursuant to 50 sections 602(e) and 603(e) of the Act and have not been repaid by Recipient shall constitute a debt to the federal government.

b. Any debts determined to be owed the federal government must be paid promptly by Recipient. A debt is delinquent if ii has not been paid by the date specified in Treasury’s initial kitten demand for payment, unless other satisfactory arrangements have been made or if the Recipient knowingly or improperly retains funds that are a debt as defined in paragraph 14(a). Treasury will take any actions available to it to collect such a debt.

15. Disclaimer

a. The United States expressly disclaims any and all responsibility or liability to Recipient or third persons for the actions of Recipient or third persons resulting in death, bodily injury, property damages, or any other losses resulting in any way from the performance of this award or any other losses resulting in any way from the performance of this award or any contract, or subcontract under this award. b. The acceptance of this award by Recipient does not in any way establish an agency relationship between the United States and Recipient.

16 Protections for Whistleblowers

a. In accordance with 4 l U.S.C. § 47 12. Recipient may not discharge, demote, or otherwise discriminate against an employee in reprisal for disclosing to any of the list of persons or entities provided below, information that the employee reasonably believes is evidence of gross mismanagement of a federal contract or grant, a gross waste of federal funds, an abuse of authority relating to a federal contract or grant, a substantial and specific danger to public health or safety, or a violation of law, rule, or regulation related to a federal contract (including the competition for or negotiation of a contract) or grant.
b. The list of persons and entities referenced in the paragraph above includes the following:
i. A member of Congress or a representative of a committee of Congress; ii. An Inspector General;
iii. The Government Accountability Office;
iv. A Treasury employee responsible for contract or grant oversight or management; v. An authorized official of the Department of Justice or other law enforcement agency; vi. A court or grand jury; or
vii. A management official or other employee of Recipient, contractor, or subcontractor who has the responsibility to investigate, discover, or address misconduct. c. Recipient shall inform its employees in writing of the rights and remedies provided under this section, in the predominant native language of the workforce.

17 Increasing Seat Belt Use in the United States Pursuant to Executive Order 13043, 62 FR 19217 (Apr. 18, 1997), Recipient should encourage its contractors to adopt and enforce on-the-job scat belt policies and programs for their employees when operating company-owned, rented or personally owned vehicles.

18 Reducing Text Messaging While Driving Pursuant to Executive Order 13513, 74 FR 51225 (Oct. 6, 2009), Recipient should encourage its employees, subrecipients, and contractors to adopt and enforce policies that ban text messaging while driving, and Recipient should establish workplace safety policies to decrease accidents caused by distracted drivers.
51 OMB Approved No. 1505 -0271
Expiration Date: 11/30/202 l

ASSURANCE OF COMPLIANCE WITH CIVIL RIGHTS REQUIREMENTS

ASSURANCE OF COMPLIANCE WITH TITLE VI OF THE
CIVIL RIGHTS ACT OF 1964

As a condition of receipt of federal financial assistance front the Department of the Treasury, the City of Merced (hereinafter referred to as “the Recipient”) provides the assurances stated herein. The federal financial assistance may include federal grants, loans and contracts to provide assistance to the recipient’s beneficiaries, the use or rent of Federal land or property at below mark et value, Federal training, a loan of Federal personnel, subsidies, and other arrangements with the intention of providing assistance. Federal financial assistance does not encompass contracts of guarantee or insurance, regulated programs, licenses, procurement contracts by the Federal government at market value, or programs that provide direct benefits.

This assurance applies to all federal financial assistance from or funds made available through the Department of the Treasury, including any assistance that the Recipient may request in the future.

The Civil Rights Restoration Act of 1987 provides that the provisions of this assurance apply to all of the recipient's programs, services and activities, so long as any portion of the recipient’s program(s) is f ederally assisted in the manner proscribed above.

1. Recipient ensures its current and future compliance with Title VI of the Civil Rights Act of 1964, as amended, which prohibits exclusion from participation, denial of the benefits of, or subjection to discrimination under programs and activities receiving federal funds, of any person in the United States on the ground of race, color, or national origin (42 U.S.C. § 2000d et seq.), as implemented by the Department of the Treasury Title VI regulations at 31 CFR Part 22 and other pertinent executive orders such as Executive Order 13166; directives; circulars; policies; memoranda and/or guidance documents.

2. Recipient acknowledges that Executive Order 13166, “Improving Access to Services for Persons with Limited English Proficiency,” seeks to improve access to federally assisted programs and activities for individuals who, because of national origin, have Limited English proficiency (LEP). Recipient understands that denying a person access to its programs, services, and activities because of LEP is a form of national origin discrimination prohibited under Title VI of the Civil Rights Act of 1964 and the Department of the Treasury’s implementing regulations. Accordingly, Recipient shall initiate reasonable steps, or comply with the Department of the Treasury’s directives, to ensure that LEP persons have meaningful access to its programs, services, and activities. Recipient understands and agrees that meaningful access may entail providing language assistance services, including oral interpretation and written translation where necessary, to ensure effective communication in the Recipient’s programs, services, and activities.

3. Recipient agrees to consider the need for language services for LEP persons during development of applicable budgets and when conducting programs, services and activities. As a resource, the Department of the Treasury has published its LEP guidance at 70 FR 6067. For more information on LEP, please visit http:www.lep.gov

4. Recipient acknowledges and agrees that compliance with this assurance constitutes a condition of continued receipt of federal financial assistance and is binding upon Recipient and Recipient’s successors, transferees and assignees for the period in which such assistance is provided.

5. Recipient acknowledges and agrees that it must require any sub-grantees, contractors, subcontractors, successors, transferees, and assignees to comply with assurances I fi above, and agrees to incorporate the following language in every contract or agreement subject to Title VI and its regulations between the Recipient and the Recipient’s sub-grantees, contractors, subcontractors, successors, transferees, and assignees:

The sub-grantee, contractor, subcontractor, successor, transferee, arid assignee shall comply with Title VI of the Civil Rights Act of 1964, which prohibits recipients of federal financial assistance from excluding from a program or activity, denying benefits of, or otherwise 52 EXHIBIT “F” – PAYMENT AND PERFORMANCE
BONDS

56 PERFORMANCE BOND

KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the City of Merced (hereinafter referred to as “City”) has awarded to ____________________, (hereinafter referred to as the “Contractor”) _______________________ an agreement for ______________________________ (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, _______________, the undersigned Contractor and _____________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of ___________________________ DOLLA RS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and se verally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the co venants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its officers and agents, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hol d good for a period of one (1) year after the acceptance of the work by City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship, Surety shall undertake and faithfully fulfill all such obligations. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure section 337.15.

Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:
57 (1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the City to complete the Project in any manner consistent with local, California and federal law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount pr eviously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to th e Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project, including but not limited to the provisions of sections 2819 and 2845 of the California Civil Code.

58 IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__).
(Corporate Seal)
Contractor/ Principal
By

Title

(Corporate Seal) Surety
By
Attorney-in-Fact
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached.
(Attach Attorney-in-Fact Certificate) Title

The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________ ___________________________________________
___________________________________________

(Name and Address of Agent or ___________________________________________ Representative for service of
process in California, if different ___________________________________________ from above)
___________________________________________
(Telephone number of Surety and ___________________________________________ Agent or Representative for service
of process in California)

NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

59 Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer

Title(s) Title or Type of Document
Partner(s)
Limited

General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

60 Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer

Title(s) Title or Type of Document
Partner(s)
Limited

General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

61 PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS That

WHEREAS, the City of Merced (hereinafter designated as the “City”), by action taken or a resolution passed ___________ , 20 ____has awarded to ________________ hereinafter designated as the “Principal,” a contract for the work described as follows:
_____________________________________________________ (the “Project”); and WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract Documents for the Project dated __________________ (“Contract Documents”), the terms and conditions of which are expressly incorporated by reference; and WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors s hall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemploym ent Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of ______________ Dollars ($___________) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 9100 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified.

This bond shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or 62 attempted rescission of the contract , agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 9100 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned and the provisions o f sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
By

Title

(Corporate Seal) Surety
By
Attorney-in-Fact
Title

Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. A Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

63 Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/s he/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer

Title(s) Title or Type of Document
Partner(s)
Limited

General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

64 Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer

Title(s) Title or Type of Document
Partner(s)
Limited

General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

65 APPENDIX

66 67
68 69

CITY OF MERCED STANDARD DESIGNS

THE FOLLOWING STANDARDS ARE FOR REFERENCE ONLY

REFER TO THE CITY OF MERCED WEBSITE FOR THE COMPLETE LISTING OF

STANDARD DETAILS

https://www.cityofmerced.org/departments/engineering/standard-designs/ 70 STATE GENERAL PREVAILING WAGE RATES

General prevailing wage determination
Made by the Director of Industrial Relations
Pursuant to California Labor Code part 7,
Chapter 1, article 2, sections 1770, 1773, and 1773.1
__________________________________________________
State of California Department of Industrial Relations Website:
http://www.dir.ca.gov/OPRL/PWD/index.htm
71 LOCATION MAP

PUCHASING DEPARTMENT DRIVING DIRECTIONS

72 REGULATION VIII – FUGITIVE PM10 PROHIBITIONS