Attachment 2
AMENDMENT MODIFICATION SUMMARY - (E-76)

FEDERAL AID PROGRAM CALIFORNIA DEPARTMENT OF TRANSPORTATION DLA LOCATOR: 10-MER-O-MER PROJECT LOCATION:

PREFIX: IN THE CITY OF MERCED AT MCGREGOR ST, WINDSOR AVE, HOME AVE, WOODWARD AVE AND PARKWEST ST.

PROJECT NO: S0BS5(060) TYPE OF WORK:

STATE PROJ NO: 10200237L.N SEQ NO: CONSTRUCT PEDESTRIAN IMPROVEMENTS IN THE SOUTHWEST AREA PREV AUTH/ AGREE DATES:

FED RR NO'S:

ALT. PROJ NO: PUC CODES: RW:

AGENCY: MERCED PROJ OVERSIGHT: ASSUMED/LOCAL ADMIN CON:

ROUTE: ENV STATUS / EIS 10/17/2021 SPR:

DISASTER NO: RW STATUS / DT: 1 06/28/2023 MCS:

TIP DATA INV RTE: OTH:

MCAG BEG MP:

FSTIP YR: 23/24 END MP: PROJECT END DATE (PED): 05/05/2026 STIP REF: 205-0000-0320 BRIDGE NO:

FSTIP ID CMAQ21-06

PROG CODE LINE NO IMPV TYPE FUNC SYS URBAN AREA URB/RURAL DEMO ID Y003 31 28
Z0E3 10 15
Z0E3 30

EUNDING SUMMARY

PHASE PROJECT COST FEDERAL COST AC COST
PE PREV. OBLIGATION $39,729.00 $35,172.00 $0.00
PE PE THIS $0.00 $0.00 $0.00
PE SUBTOTAL $39,729.00 $35,172.00 $0.00
RW PREV. OBLIGATION $0.00 $0.00 50.00
RW THIS REQUEST $0.00 $0.00 $0.00
RW SUBTOTAL $0.00 $0.00 $0.00
CON PREV. OBLIGATION $456,884.00 $404,479.00 $0.00
CON CON THIS REQUEST $333,333.00 $80,896.00 $0.00
CON SUBTOTAL $790,217.00 $485,375.00 $0.00
OTH PREV. OBLIGATION $0.00 $0.00 $0.00
OTH OTH THIS REQUEST $0.00 $0.00 $0.00
OTH SUBTOTAL $0.00 $0.00 $0.00
TOTAL: $829,946.00 $520,547.00 50.00

STATE REMARKS
05/12/2022 * SEQ 1: Initial authorization of the PE phase. * Project End Date (PED) established as 08/01/2023 effective SEO 1 approval. * eque ne f2 s alegotesi fo exten he projec end date (PED) from 8/01/23 10 8/14/24. Project progress has been slowed by negoliations with the utilites on the eventual relocation of their facities. There are no 04/12/2024
05/14/2024 SEQ 3: Initial CON authorization. Obligating $404,479 of ZOE3 funds to CON. Agency is not requesting CE. PED changed to 05/05/26 02/05/2025 *SEQ4: AMOD adding $80,896 of YOO3.
02/07/2025 SEQ 4: Construction adjustment prior to award via post programming adjustment. Obligating $80,896 of Y003 to CON

FEDERAL REMARKS

AUTHORIZATION
AUTHORIZATION TO PROCEED WITH REQUEST:CON PREPARED IN FADS BY: NORIEGA, JASMINE ON 2025-02-05 948-3755 FOR: AMOD REVIEWED IN FADS BY: WULFF, DARLENE ON 2025-02-07 741-5450 DOCUMENT TYPE: AMOD SUBMITTED IN FADS BY: WULFF, DARLENE ON 2025-02-07 FOR CALTRANS PROCESSED IN FADS BY: SIGNATURE, NOT_REQUIRED ON 2025-02-07 FOR HWA E-76 AUTHORIZED DATE IN FMIS ABDUL ELKAISSI ON 2025-02-11 12:12:42.0 SIGNATURE HISTORY FOR PROJECT NUMBER 5085(060) AS OF 02/19/2025

FHWA FMIS SIGNATURE HISTORY
MOD # SIGNED BY SIGNED ON
WAll HAYS 02/10/2025
WAII HAYS 02/10/2025
ABDUL ELKAISSI 02/11/2025
JERILYNN FOGLE 06/06/2024
JERILYNN FOGLE 06/06/2024
GRACE REGIDOR 06/11/2024
WAll HAYS 06/05/2023
WAll HAYS 06/05/2023
GRACE REGIDOR 06/12/2023
SHUN HUEY 06/01/2022
SHUN HUEY 06/01/2022
GRACE REGIDOR 06/02/2022
FHWA FMIS 3.0 SIGNATURE HISTORY

CALTRANS SIGNATURE HISTORY

DOCUMENT TYPE SIGNED BY SIGNED ON
AMEND/MOD WULFF, DARLENE 02/07/2025