Attachment 1
PROJECTNO. EP22021 CP30001
SANTA FE STRIP PARK SIDEWALK YOSEMITE TO BLACK RASCAL CREEK Bid Opening 6/10/2025 at 2:00pm Juarez Brothers General M4 Concrete & Drywall, Inc. Taylor Backhoe Service, Inc. DBA New Century Construction & Engineering Inc. TBS Contractors Ag & Industrial Enterprises, Inc. Consulting, Inc. FBD Vanguard Construction, Inc. American Paving, Co. (Turlock, CA) (Earlimart, CA) (Livermore, CA) (Fresno, CA) (Madera, CA) (Merced, CA) (Turlock, CA)
UNIT OF ESTIMATED UNIT ITEM UNIT ITEM UNIT ITEM UNIT ITEM UNIT ITEM UNIT ITEM ITEM
ITEM MEASURE TOTAL PRICE TOTAL PRICE
Schedule A - Road Improvements
[Permits, Bonds, Licenses & Insurance 10,000.00 S 10,000.00 S 27,200.005 27,200.005 24,000.00 S 24,000.00 S 20,000.00 S 20,000.00 80,910.00 S 80,910.00 40,000.00 S 40,000.00 5,000.00 5,000.00 2 Pubie Pollen control Safety. 7,50000 8 10,000.00 5 7,600.00 S 7,600.00 S 6,000.00S 6,000.00 $ 15,000.005 15,000.00 S 15,000.00 S 15,000.005 6,000.00 S 6,000.00 S 15,0000 8 50,000.00 7,500.00 S 6,500.00$ 6,500.00 S 6,840.00 S 6,840.00 $ 15,000.00 S 15,000.00$ 6,500.00$ 6,500.00S 4,000.00$ 4,000.00 S 25,000.00 4 Surveying 10,000.00 $ 10,000.00S 16,750.005 16,750.005 19,890.005 19,890.00 5 12000.00 S 12,000.00 S 9,600.00 9,600.00 S 15,000.00 $ 15,000.00 $ 10,000.00 S 10,000.00 5 Project Funding Sign 7,500.00 S 45,0000 S 3,30000 $ 2.210.00 S 600.00 1,200.00 1,000.00 2,000.00 S 500.00 | 1,000.00 430.00 860.00 1,500.00 6 Clearing and Grubbing 45,000.005 8,500.00$ 12,000.00 $ 12,000.00 $ 15,000.00 $ 15,000.00 $ 13,000.00 $ 64,205.005 64,205.00 $ 415,800.00 S 415,800.00 Remove Conc S/W 11.245 7,238.56 5 1,687.28 20.00 12,880.00 5 6.00 S 32000 3.864, $ 9,016.00 644.00 Remove Conc Bike Way 15.051.28 8.00 S 84,208.00 | 27,578.12 12.00 126,312.00 S 168,416.00 12,631.20 Remove Concrete Curb & Gutter 13,000.12 58.00 6,728.00 13.04 1.512.64 100.00 11,600.00$ 25.00 2,900.00 2,320.00 6.00 696.00 10 Remove Asphalt Concrete 15,006.58 8,585.00 3,537.02 10.00 17,170.00 10.202.00 8. 13,736.00 1 9r 2.262 30 11 Remove Tree 1,800.00 es 5,000.00 $ 10,000.00 S 1,742.40 3,484.90 $ 3,700.00 $ 7,400.00 3,000.00 6,000.00 9,800.00 3,900.00 7,800.00 12 stall 8 Conc Bike Way 107,478.00 13.20 202,672.80 14.31 219,715.74 15.00 230,310.00 222,633.00 211,885.20 13 nstall 12' Conc Bike Way 54,936.00 12.80 S 97.664.00 119,333.20 12.00 91,560.00 S 18.00 137,340.00 125,895.00 16.50 125,895.00 14 stall Concrete Sidewalk 15,730.00 18.00 S 12,870.00 8,830.25 25.00 17,875.00 S 18.00 12,870.00 10,010.00 AARA TA 19.00 13,585.00 15* in c
pall Curh and Gutton 5,104.00 100.00 11,600.00 7,469.24 50.00 100 0n 11,600.00 5,800.00 125 00 14,500.00 16 stall Concrete Drive Way 13,775.00 32.00 17,632.00 5 9,157.62 25.00 13,775.00 S 20.00 11,020.00 9,918.00 20.00 11,020.00 17 tall Bollard (Bikeway Barrier) 11,250.00 900.00 8.100.00 3.422.97 500.00 4,500.00S 250.00 2,250.00 14,400.00 2,400.00 21,600.00 18 tall Stamp Concrete 14,328.00 26.00 15,522.00( 22,357.65 35.00 20,895.00 $ 26.00 15,522.00 41.00 24,477.00 50.00 29,850.00 2,532.60 95.00 10,260.00 47.33 5,111.64 50.00 5a00 nois 10 on 4 320 00 89.00 9,612.00 70.00 7 560 0г Install AC (3"AC/6 AB) Collector 9,295.58 5 29.00 s 27.202.00 | 36.00 s 33,768.00 S 20.00| 18,760.005 15.00 $ 14,070.00$ 22.00 20,636.00 33.00 30,954.00 nstall AC (3"AC/6°AB) Local 5,000.00 S 85.00 S 3,400.00 | 33.60 1,344.00| S 40.00 S 1,600.00 S 62.50 S 2,500.00 S 20.00 S 800.00 S 34.00 1,360.00 Install Steel Plate (2'X15") 5,000.00 51 6,000.00 $ 12,000.00 14,592.00 29,184.00 250.00 500.00 S 3,000.00 S 6,000.00$ 7,500.00 $ 15,000.00 S 5,000.00 S 10,000.00 Install Speed Hump Sign 1,105.00 600.00 1,200.00 500.00 1,000.005 700.00 $ 1,400.00 630.00$ 1,260.00 S 800.00 s 1,600.00 Install Truncated Dome 5.000.00 S 1,400.00 5] 2,800.00 1,212.00 S 2,424.00 1,000.00 2,000.00 S 2,400.00$ 4,800.00$ 825.00 S 1,650.00 S 1,700.00 S 3,400.00 25 Striping (Speed Hump) 20,000.00 S 5,000.00S 5,000.00 2,400.00 S 2,400.00 S 1,000.00 1,000.00 S 5,500.00 S 5,500.00S 6,000.00$ 6,000.00 S 7,200.00S 7,200.00 nstall R44A Sign 5,000.00 S 750.00 S 3,000.00 l 600.00 2,400.00 500.00 2000.00 S 500.00 S 2,000.00 S 630.00 S 2,520.00 S 800.00 S 3,200.00 Install Catch Basin/Inlet 5,000.00 8,800.00 $ 8,800.00 8,798.40 8,798.40 21,000.00 21,000.00$ 3,500.00 $ 3,500.00 $ 6,200.00 $ 6,200.00 $ 10,000.00 28 install 4° C900 Water Main 5.000.00 S 350.00 S 14,000.00 S 496.20 19,848.00 45.00 1,800.00 S 100.00 S 4,000.00 S 300.00 5 12,000.00 $ 21,600.00 29* nstall Blow Off Valve (Christy box/cover) 386 18,336.00 2,200.00 20000 8 2,200.00 uses 5,814.00 3,24000 8 5,814.00 1,000.00 1,000.00$ 4,500.00 $ 4,500.00 $ 3,000.00 $ 1,500.00 30 Adjust Storm Drain MH to (N) Grade 1,848. 2,100.00 1,080.00 8,000.00 24,000.00 5 1,000.00 S 3,000.00 5 2,200.00 S 1,200.00 s 3,600.00 31 Restoration 23,206.00 $ 23,206.00 S 4,000.00 S 4,000.005 35,820.00 35,820.00 30,863.00 30,863.00 S 18,500.00 $ 18,500.00 S 49,000.00 S 10,000.00 10,000.00 TOTAL BID SCHEDULE "A" ITEMS 1 THROUGH 30) 519,879.33 648,552.36 649,368.57 750,000.00 753,296.00 880,764.00 | $ 1,074,142.70 ** Corrections to unit prices