Attachment 4
Local Assistance Procedures Manual
EXHIBIT 10-H2
Cost Proposal
Note: Mark-ups are Not Allowed
Consultant Prime Consultant Subconsultant
2nd Tier Subconsultant
Project No: Contact No.
Date: 5/28/2025
For Combined Rate Fringe Benefit %
72.040% + =
For Home Office Rate Fringe Benefit %
0% + =
For Field Office Rate Fringe Benefit %
0% + =
Average % Hourly
hourly Increase Range for
Straight OT (1.5) OT (2.0) From To rate Classifications ONLY $273.74 N/A N/A 7/1/2024 6/30/2025 $80.50 $70.52 - $88.34 $283.32 N/A N/A 7/1/2025 6/30/2026 $83.32 3.50%
$293.23 N/A N/A 7/1/2026 6/30/2027 $86.23 3.50%
$303.50 N/A N/A 7/1/2027 6/30/2028 $89.25 3.50%
$212.05 N/A N/A 7/1/2024 6/30/2025 $62.36 $50.06 - $70.68 $219.47 N/A N/A 7/1/2025 6/30/2026 $64.54 3.50%
$227.16 N/A N/A 7/1/2026 6/30/2027 $66.80 3.50%
$235.11 N/A N/A 7/1/2027 6/30/2028 $69.14 3.50%
$169.45 N/A N/A 7/1/2024 6/30/2025 $49.83 $47.59 - $51.52 $175.38 N/A N/A 7/1/2025 6/30/2026 $51.57 3.50%
$181.51 N/A N/A 7/1/2026 6/30/2027 $53.38 3.50%
$187.87 N/A N/A 7/1/2027 6/30/2028 $55.25 3.50%
$138.30 $158.63 $178.97 7/1/2024 6/30/2025 $40.67 $36.96 - $44.43 $143.14 $164.18 $185.23 7/1/2025 6/30/2026 $42.09 3.50% $148.15 $169.93 $191.71 7/1/2026 6/30/2027 $43.57 3.50% $153.33 $175.88 $198.42 7/1/2027 6/30/2028 $45.09 3.50%
0.00% 0.00%
EXHIBIT 10-H2 COST PROPOSAL
SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)
BSK Associates
Participation Amount $
General &Administrative % Combined ICR %
137.093% 209.13%
OR
General &Administrative % Home Office ICR %
General &Administrative % Field Office ICR %
0.00% 0.00%
FEE % = 10%
Project Professional II
Salary Increase % = 3.5%
Name - Job Title/Classification
Hourly Billing Rates Effective date of hourly rate
Principal
Exempt
Senior Professional
Exempt
NOTES:
1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**).All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
2. The cost proposal format shall not be amended.
3. Billing rate = actual hourly rate * (1+ ICR) * (1+ Fee). Indirect cost rates shall be updated on an annual basis in accordance with the consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans. All costs must comply with the Federal cost principles for reimbursement.
4. For named employees and key personnel enter the actual hourly rate. For classifications only, enter the Average Hourly Rate for that classification.
Exempt
Project Professional I
Non-Exempt
Local Assistance Procedures Manual
EXHIBIT 10-H2
Cost Proposal
Note: Mark-ups are Not Allowed
Consultant Prime Consultant Subconsultant
2nd Tier Subconsultant
Project No: Contact No.
Date: 5/28/2025
For Combined Rate Fringe Benefit %
72.040% + =
For Home Office Rate Fringe Benefit %
0% + =
For Field Office Rate Fringe Benefit %
0% + =
Average % Hourly
hourly Increase Range for
Straight OT (1.5) OT (2.0) From To rate Classifications ONLY $124.25 $142.52 $160.79 7/1/2024 6/30/2025 $36.54 $32.96 - $40.00 $128.60 $147.51 $166.42 7/1/2025 6/30/2026 $37.82 3.50% $133.10 $152.67 $172.25 7/1/2026 6/30/2027 $39.14 3.50% $137.76 $158.02 $178.27 7/1/2027 6/30/2028 $40.51 3.50% $101.88 $116.86 $131.84 7/1/2024 6/30/2025 $29.96 $28.29 - $31.42 $105.44 $120.95 $136.45 7/1/2025 6/30/2026 $31.01 3.50% $109.13 $125.18 $141.23 7/1/2026 6/30/2027 $32.09 3.50% $112.95 $129.56 $146.17 7/1/2027 6/30/2028 $33.22 3.50% $110.38 $126.61 $142.84 7/1/2024 6/30/2025 $32.46 $29.01 - $36.40 $114.24 $131.04 $147.84 7/1/2025 6/30/2026 $33.60 3.50% $118.24 $135.63 $153.01 7/1/2026 6/30/2027 $34.77 3.50% $122.38 $140.37 $158.37 7/1/2027 6/30/2028 $35.99 3.50% $96.10 $110.23 $124.36 7/1/2024 6/30/2025 $28.26 $26.00 - $30.52 $99.46 $114.09 $128.71 7/1/2025 6/30/2026 $29.25 3.50%
$102.94 $118.08 $133.21 7/1/2026 6/30/2027 $30.27 3.50% $106.54 $122.21 $137.88 7/1/2027 6/30/2028 $31.33 3.50% NOTES:
1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**).All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
2. The cost proposal format shall not be amended.
3. Billing rate = actual hourly rate * (1+ ICR) * (1+ Fee). Indirect cost rates shall be updated on an annual basis in accordance with the consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans. All costs must comply with the Federal cost principles for reimbursement.
4. For named employees and key personnel enter the actual hourly rate. For classifications only, enter the Average Hourly Rate for that classification.
Non-Exempt
Administrative Assistant
Non-Exempt
Project Administrator
Staff Professional II
Salary Increase % = 3.5%
Name - Job Title/Classification
Hourly Billing Rates Effective date of hourly rate
Non-Exempt
Staff Professional I
Non-Exempt
General &Administrative % Field Office ICR %
0.00% 0.00%
FEE % = 10%
0.00% 0.00%
EXHIBIT 10-H2 COST PROPOSAL
SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)
BSK Associates
Participation Amount $
General &Administrative % Combined ICR %
137.093% 209.13%
OR
General &Administrative % Home Office ICR %
Local Assistance Procedures Manual
EXHIBIT 10-H2
Cost Proposal
Note: Mark-ups are Not Allowed
Consultant Prime Consultant Subconsultant
2nd Tier Subconsultant
Project No: Contact No.
Date: 5/28/2025
For Combined Rate Fringe Benefit %
72.040% + =
For Home Office Rate Fringe Benefit %
0% + =
For Field Office Rate Fringe Benefit %
0% + =
Average % Hourly
hourly Increase Range for
Straight OT (1.5) OT (2.0) From To rate Classifications ONLY $147.07 $168.70 $190.32 7/1/2024 6/30/2025 $43.25 $33.35 - $52.00 $152.22 $174.60 $196.98 7/1/2025 6/30/2026 $44.76 3.50% $157.55 $180.71 $203.88 7/1/2026 6/30/2027 $46.33 3.50% $163.06 $187.04 $211.01 7/1/2027 6/30/2028 $47.95 3.50% $119.44 $137.00 $154.57 7/1/2024 6/30/2025 $35.13 $27.04 - $44.00 $123.62 $141.80 $159.98 7/1/2025 6/30/2026 $36.35 3.50% $127.95 $146.76 $165.58 7/1/2026 6/30/2027 $37.63 3.50% $132.43 $151.90 $171.37 7/1/2027 6/30/2028 $38.94 3.50% $91.00 $104.38 $117.76 7/1/2024 6/30/2025 $26.76 $21.00 - $39.40 $94.18 $108.03 $121.88 7/1/2025 6/30/2026 $27.70 3.50%
$97.48 $111.81 $126.14 7/1/2026 6/30/2027 $28.67 3.50%
$100.89 $115.72 $130.56 7/1/2027 6/30/2028 $29.67 3.50% $82.26 $94.35 $106.45 7/1/2024 6/30/2025 $24.19 $23.69 - $24.68 $85.14 $97.65 $110.17 7/1/2025 6/30/2026 $25.04 3.50%
$88.12 $101.07 $114.03 7/1/2026 6/30/2027 $25.91 3.50%
$91.20 $104.61 $118.02 7/1/2027 6/30/2028 $26.82 3.50%
NOTES:
1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**).All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
2. The cost proposal format shall not be amended.
3. Billing rate = actual hourly rate * (1+ ICR) * (1+ Fee). Indirect cost rates shall be updated on an annual basis in accordance with the consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans. All costs must comply with the Federal cost principles for reimbursement.
4. For named employees and key personnel enter the actual hourly rate. For classifications only, enter the Average Hourly Rate for that classification.
Non-Exempt
Technician / Courier
Non-Exempt
Lab Technician
Special Inspector
Salary Increase % = 3.5%
Name - Job Title/Classification
Hourly Billing Rates Effective date of hourly rate
Non-Exempt
Engineering Technician
Non-Exempt
General &Administrative % Field Office ICR %
0.00% 0.00%
FEE % = 10%
0.00% 0.00%
EXHIBIT 10-H2 COST PROPOSAL
SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)
BSK Associates
Participation Amount $
General &Administrative % Combined ICR %
137.093% 209.13%
OR
General &Administrative % Home Office ICR %
Local Assistance Procedures Manual
EXHIBIT 10-H2
Cost Proposal
Note: Mark-ups are Not Allowed
Consultant Prime Consultant Subconsultant
2nd Tier Subconsultant
Project No: Contact No.
Date: 5/28/2025
For Combined Rate Fringe Benefit %
72.040% + =
For Home Office Rate Fringe Benefit %
0% + =
For Field Office Rate Fringe Benefit %
0% + =
Average % Hourly
hourly Increase Range for
Straight OT (1.5) OT (2.0) From To rate Classifications ONLY $206.65 $237.03 $267.42 7/1/2024 6/30/2025 $60.77 $60.77 $206.65 $237.03 $267.42 7/1/2025 6/30/2026 $60.77
$206.65 $237.03 $267.42 7/1/2026 6/30/2027 $60.77
$206.65 $237.03 $267.42 7/1/2027 6/30/2028 $60.77
$199.85 $229.23 $258.62 7/1/2024 6/30/2025 $58.77 $58.77 $199.85 $229.23 $258.62 7/1/2025 6/30/2026 $58.77
$199.85 $229.23 $258.62 7/1/2026 6/30/2027 $58.77
$199.85 $229.23 $258.62 7/1/2027 6/30/2028 $58.77
$175.33 $201.11 $226.89 7/1/2024 6/30/2025 $51.56 $51.56 $175.33 $201.11 $226.89 7/1/2025 6/30/2026 $51.56
$175.33 $201.11 $226.89 7/1/2026 6/30/2027 $51.56
$175.33 $201.11 $226.89 7/1/2027 6/30/2028 $51.56
$155.03 $177.82 $200.62 7/1/2024 6/30/2025 $45.59 $45.59 $155.03 $177.82 $200.62 7/1/2025 6/30/2026 $45.59
$155.03 $177.82 $200.62 7/1/2026 6/30/2027 $45.59
$155.03 $177.82 $200.62 7/1/2027 6/30/2028 $45.59
NOTES:
1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**).All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
2. The cost proposal format shall not be amended.
3. Billing rate = actual hourly rate * (1+ ICR) * (1+ Fee). Indirect cost rates shall be updated on an annual basis in accordance with the consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans. All costs must comply with the Federal cost principles for reimbursement.
4. For named employees and key personnel enter the actual hourly rate. For classifications only, enter the Average Hourly Rate for that classification.
Non-Exempt
Group 2 Special Inspector - North Determination**
Non-Exempt
Group 3 Engineering Techncian - North Determination**
Non-Exempt
Group 4 Technician - North Determination**
Non-Exempt
Prevailing Wage
Prevailing Wage
Prevailing Wage
Prevailing Wage
Group 1 Special Inspector - North Determination**
Salary Increase % = No further increases to DIR determination.
Name - Job Title/Classification
Hourly Billing Rates Effective date of hourly rate
No further increases to
DIR determination.
General &Administrative % Home Office ICR %
General &Administrative % Field Office ICR %
0.00% 0.00%
General &Administrative % Combined ICR %
137.093% 209.13%
OR
EXHIBIT 10-H2 COST PROPOSAL
SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)
BSK Associates
Participation Amount $
No further increases to
DIR determination.
No further increases to
DIR determination.
No further increases to
DIR determination.
0.00% 0.00%
FEE % = 10%
Local Assistance Procedures Manual
EXHIBIT 10-H2
Cost Proposal
Note: Mark-ups are Not Allowed
Consultant Prime Consultant Subconsultant
2nd Tier Subconsultant
Project No: Contact No.
Date: 5/28/2025
For Combined Rate Fringe Benefit %
72.040% + =
For Home Office Rate Fringe Benefit %
0% + =
For Field Office Rate Fringe Benefit %
0% + =
Average % Hourly
hourly Increase Range for
Straight OT (1.5) OT (2.0) From To rate Classifications ONLY $214.09 $245.57 $277.05 7/1/2024 6/30/2025 $62.96 $62.96 $214.09 $245.57 $277.05 7/1/2025 6/30/2026 $62.96
$214.09 $245.57 $277.05 7/1/2026 6/30/2027 $62.96
$214.09 $245.57 $277.05 7/1/2027 6/30/2028 $62.96
$207.29 $237.77 $268.25 7/1/2024 6/30/2025 $60.96 $60.96 $207.29 $237.77 $268.25 7/1/2025 6/30/2026 $60.96
$207.29 $237.77 $268.25 7/1/2026 6/30/2027 $60.96
$207.29 $237.77 $268.25 7/1/2027 6/30/2028 $60.96
$201.24 $230.83 $260.42 7/1/2024 6/30/2025 $59.18 $59.18 $201.24 $230.83 $260.42 7/1/2025 6/30/2026 $59.18
$201.24 $230.83 $260.42 7/1/2026 6/30/2027 $59.18
$201.24 $230.83 $260.42 7/1/2027 6/30/2028 $59.18
Non-Exempt
NOTES:
1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**).All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
2. The cost proposal format shall not be amended.
3. Billing rate = actual hourly rate * (1+ ICR) * (1+ Fee). Indirect cost rates shall be updated on an annual basis in accordance with the consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans. All costs must comply with the Federal cost principles for reimbursement.
4. For named employees and key personnel enter the actual hourly rate. For classifications only, enter the Average Hourly Rate for that classification.
Non-Exempt
Group 2 Special Inspector - South Determination**
Non-Exempt
Group 1 Engineering Techncian - South Determination**
Prevailing Wage
Prevailing Wage
Prevailing Wage
No further increases to
DIR determination.
No further increases to
DIR determination.
Group 3 NDT - South Determination**
General &Administrative % Field Office ICR %
0.00% 0.00%
FEE % = 10%
Salary Increase % = No further increases to DIR determination.
Name - Job Title/Classification
Hourly Billing Rates Effective date of hourly rate
No further increases to
DIR determination.
0.00% 0.00%
EXHIBIT 10-H2 COST PROPOSAL
SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)
BSK Associates
Participation Amount $
General &Administrative % Combined ICR %
137.093% 209.13%
OR
General &Administrative % Home Office ICR %
Local Assistance Procedures Manual
EXHIBIT 10-H2
Cost Proposal
Consultant
Prime Consultant Subconsultant
Project No.
Contract No.
Date
5/28/2025
Quantity Unit Unit Cost
1.00 $
Per attached schedule
Cost +15%
Per attached schedule
Subconsultant 1:
Subconsultant 2:
Subconsultant 3:
Subconsultant 4:
Subconsultant 5:
EXHIBIT 10-H2 COST PROPOSAL
SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)
BSK Associates
SCHEDULE OF OTHER DIRECT COST ITEMS (Add additional pages as necessary) Total
Description of Item
-
$
NOTES:
1. List other direct cost items with estimated costs. These costs should be competitive in their respective industries and supported with appropriate documentation.
2. Proposed ODC items should be consistently billed regardless of client and contract type.
3. Items when incurred for the same purpose, in like circumstance, should not be included in any indirect cost pool or in the overhead rate.
4. Items such as special tooling, will be reimbursed at actual cost with supporting documentation (invoice).
5. Items listed above that would be considered "tools of the trade" are not reimbursable as other direct cost.
6. Travel related costs should be pre-approved by the contracting agency and shall not exceed current State Department of Personnel Administration rules.
7. If mileage is claimed, the rate should be properly supported by the consultant's calculation of their actual costs for company vehicles. In addition, the miles claimed should be supported by mileage logs.
8. If a consultant proposes rental costs for a vehicle, the company must demonstrate that this is its standard procedure for all of their contracts and that they do not own any vehicles that could be used for the same purpose.
9. The cost proposal format shall not be amended. All costs must comply with the Federal cost principles.
10. Add additional pages if necessary.
11. Subconsultants must provide their own cost proposals.
Mileage Costs
Materials Laboratory Tests
Permit / Subconsultant Fees
Equipment / Unit Costs
-
$
-
$
-
$
-
$
Local Assistance Procedures Manual
EXHIBIT 10-H2
Cost Proposal
1. 2.
3. 4.
5. 6.
Name:
Title *:
Signature:
5/28/2025
Email:
Address:
691 N. Laverne Avenue, Suite 101, Fresno, CA 93727
*An individual executive or financial officer of the consultant’s or subconsultant’s organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
List services the consultant is providing under the proposed contract:
Geotechnical Engineering Services / Special Inspection and Materials Testing Services / Environmental Consulting Services Prime Consultant or Subconsultant Certifying:
Date of Certification (mm/dd/yyyy):
Chief Operating Officer
Phone Number: 209.914.7258
Tim Rodriguez
[email protected]
Title 23 United States Code Section 112 - Letting of Contracts 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.
48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) Terms and conditions of the contract
EXHIBIT 10-H2 COST PROPOSAL
Certification of Direct Costs:
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:
Generally Accepted Accounting Principles (GAAP)
January 2020
BSK Associates - Schedule of Fees - July 1, 2024 to June 30, 2025 gINT (software) 68.00 $ Slide (software) 133.00 $
LPile (software) 68.00 $ Settle3D (software) 133.00 $
APile (software) 68.00 $ Cpet-IT (software) 68.00 $
SHAFT (software) 68.00 $ LiqSVs (software) 68.00 $
GROUP (software) 133.00 $ ArcGIS (software) 68.00 $
Cliq (software) 68.00 $ Surfer (software) 68.00 $
LiquefyPro (software) 68.00 $ Seep/W (software) 133.00 $ LiqIT (software) 68.00 $
Nuclear Gauge (Day) 74.00 $ 10' PVC Blank - 2"(Each) 28.00 $ Skidmore Wilhelm Calibrator (Day) 74.00 $ 10' PVC Blank - 4: (Each) 65.00 $ NDT Weld Testing Equipment - UT/MT/PT (Day) 74.00$ 10' PVC Screen - 2" (Each) 44.00 $ Proof Load Testing Equipment (Day) 74.00 $ 10' PVC Screen - 4" (Each) 88.00 $ Torque Wrench (Day) 74.00 $ 5' PVC Blank - 2" (Each) 19.00 $ GPR Scanning Equipment (Day) 341.00 $ 5' PVC Blank - 4" (Each) 56.00 $ Rebar Locator/Pachometer (Day) 134.00 $ 5' PVC Screen - 2" (Each) 28.00 $ Coring Equipment (day) 252.00 $ 5' PVC Screen - 4" (Each) 72.00 $ Relative Humidity Meter (Day) 74.00 $ 55 Gallon Drum (Each) 131.00 $ Moisture Emission Test Kit (Each) 50.00 $ 6 "x 5' Steel Monument Cover (Each) 310.00 $ Wood Moisture Meter (Day) 74.00 $ Air Indicators (Each) 56.00 $ Air Meter (Concrete) 74.00 $ Combustible Gas Indicator (Day) 83.00 $ Laptop (Day) 79.00 $ Disposable Bailer (Each) 15.00 $
Document Scanner (Day) 34.00 $ HydroPunch Tip (Each) 26.00 $ Vehicle/Truck Charge (Day) 144.00 $ Lantec GEM 500 (Day) 271.00 $ Hand Auger (Day) 158.00 $ Locking Cap - 2" (Each) 26.00 $ Seismograph (Day) 333.00 $ Locking Cap - 4" (Each) 53.00 $ Hand-held GPS (Day) 102.00 $ Silicone Tubing (Foot) 9.00 $ Slope Inclinometer Probe (Each) 525.00 $ Tedlar Vapor Bags (Each) 32.00 $ Double Ring Infiltrometer (Day) 158.00 $ Bottom Cap (Each) 11.00 $ Drilling Kit - Paint/Stakes/Lath (Each) 36.00 $ Disposable Purge Pump Tubing (Foot) 2.00 $ Drilling Supplies (Tubes / Caps) 368.00 $ Bison Resistivity Meter (Day) 213.00 $ Sample Sleeve w/ Caps/Teflon 6" (Each) 14.00$ Chem Grout Pump (Day) 139.00 $ Manometer (Day) 259.00 $ DC Purge Pump (Day) 70.00 $
Generator 110.00 $ Development Pump and Controller (Day) 97.00 $ Power Auger 110.00 $ Dissolved Oxygen Meter (Day) 84.00 $ AC Cold Patch (Each) 20.00 $ Grundfos Converter (Day) 93.00 $ Bentonite Grout (Bag) 28.00 $ HydroPunch II (Each) 333.00 $ Bentonite Medium Chips (Bag) 26.00 $ Interface Meter (Each) 125.00 $ Bentonite Pellets (Bucket / Bag) 198.00 $ Kemmer Sampler (Day) 48.00 $ Bentonite Powder (Bag) 16.00 $ ORP Meter (Each) 89.00 $ Filter Sand (Bag) 15.00 $ Sample Pump (Day) 133.00 $
Portland Cement (Bag) 20.00 $ Scanning Equipment (Day) 134.00 $ Ready Mix (Bag) 19.00 $ Water Level Data Logger (Day) 103.00 $ Padlocks (Each) 28.00 $ Telescopic Wastewater Sampler (Day) 70.00 $ pH/EC/Temperature Meter (Day) 79.00 $ SVE System (Month) 1,470.00 $ PID/OVA (Day) 158.00 $ Combustible Gas Meter (Day) 252.00 $ Steam Cleaner (Day) 146.00 $ Water Meter (Day) 68.00 $
Turbidity Kit (Day) 89.00 $ Flow Monitoring Equipment (Day) 408.00 $ Water Sample Filters (Each) 29.00 $ Liquid Proportional Sampling Equipment (Day) 414.00 $ Well Sounder (Day) 63.00 $ Gas Detector Pump (Each) 48.00 $ Well Vault Traffic Rated Box (Each) 146.00 $ Landfill Gas Chromatograph (Day) 273.00 $ Bollards (Each) 125.00 $ Support Truck (Day) 273.00 $
Air Compressor (Day) 74.00 $ Sound Level Meter (Each) 43.00 $ Continuous Core Sampler (Day) 341.00 $ Water Level Transducers (Each) 16.00 $ 4" Disposable Bailers (Each) 26.00 $ Multiparameter Env Water Meter (Day) 179.00 $ Escalation: The prices noted below are subject to an increase of 5% annually, effective July 1 of each year following the initiation of a services agreement.
SOFTWARE AND EQUIPMENT
ANALYSIS SOFTWARE USAGE FEES
EQUIPMENT
BSK Fee Schedule 2024-2
BSK Associates - Schedule of Fees - July 1, 2024 to June 30, 2025 Modified or Standard Proctor - 4" or 6" Mold (ASTM / AASHTO) 336.00$ % Crushed Particles / Fractured Particles (CT 205/AASHTO T335) 218.00 $ Proctor with Oversize Material (ASTM / AASHTO) 420.00$ % Flat & Elongated (ASTM D4791) 167.00 $ Proctor Check Point (All Methods) 180.00 $ Minus 200 Wash/Aggregate (ASTM C117) 110.00 $ Caltrans Maximum Wet Density (CT 216) 284.00 $ Sieve Analysis w/ Wash (ASTM C136 / CT 202 / AASHTO T27) 226.00 $ Minus 200 Wash Soil (ASTM D1140) 110.00 $ Sieve Analysis - Coarse Only (ASTM C136 / CT 202 / AASHTO T27) 110.00 $ Moisture Content of Soils (ASTM D2216) 47.00 $ Coarse Specific Gravity / Absorption (ASTM C127/CT 206/AASHTO T85) 210.00$ Plasticity Index (ASTM D4318) 290.00 $ Fine Specific Gravity / Absorption (ASTM C128/CT 207/AASHTO T84) 210.00 $ Expansion Index of Soils (UBC No. 29) 311.00 $ Sand Equivalent (ASTM D2419 / CT 217 / AASHTO T176) 167.00 $ Collapse Potential of Soils (ASTM D2435) 270.00 $ Durability Index (CT 229) 331.00 $ Organic Impurities (ASTM C40 / CT 213) 110.00 $ Abrasion by LA Rattler, Large Size (ASTM C131/CT 211/AASHTO T96) 378.00 $ Tube Density & Moisture Content of Soil (ASTM D2216, D2937) 57.00$ Abrasion by LA Rattler, Small Size (ASTM C131/CT 211/AASHTO T96) 311.00 $ Visual Classification (ASTM D2488) 57.00 $ Cleanness Value of Aggregate (CT 227) 238.00 $ Hydrometer (ASTM D422 / CT 203) 315.00 $ Aggregate Wt pcf Compacted (ASTM C 29) 117.00 $ Double Hydrometer (ASTM D4221) 414.00 $ Gradation-Rip Rap - Per Sieve (D5519-Method A) 298.00 $ Uncompacted Void Content (CT 234 / AASHTO T304) 147.00$ Sodium Sulfate Soundness-Min. Charge (ASTM C88/CT 214/AASHTO T104) 462.00$ Sand Density Calibration (ASTM D1566) 231.00 $ Sodium Sulfate Soundness-Per Sieve (ASTM C88/CT 214/AASHTO T104) 147.00$ Minimum Resistivity of Soils (CT 643) 186.00 $ R-Value of Soils (CT 301) 473.00 $ Consolidation (ASTM D2435) w/ 2 Time Rates 553.00$ Soil Cement Compression - Set (ASTM D1633) 315.00 $ Consolidation (ASTM D2435) w/ No Time Rates 368.00$ CIR / FDR Compressive Strength Testing - Set 315.00 $ Unconfined Compressive Strength, Soil (ASTM D2166) 147.00$ CIR / FDR Sample Preparation / Compaction 289.00 $ Remolded Consolidation (ASTM D2435) 468.00 $ CBR (ASTM D1883/AASHTO T-180) 1,313.00 $ Minimum Index Density Soils (ASTM D4254) 91.00 $ Preparation of Soil-Cement Samples 994.00 $ Direct Shear Remolded (ASTM D3080) 347.00 $ Soluble Sulfate Chloride & Sulfide 172.00 $ Direct Shear (ASTM D3080) 290.00 $ pH Sulfate & Chloride 87.00 $ Remolded Direct Shear (ASTM D3080) 347.00 $ % Lumps/Friable Particles (ASTM C142) 107.00 $ Remolded Flexwall Perm (ASTM D5084) 739.00 $ % Organics in Soil (ASTM D2974) 181.00 $ JMF Mix Design, Superpave / Caltrans 11,838.00 $ Bitumen Content - Ignition (ASTM D6307 / CT382 / AASHTO T308) 296.00 $ JMF Verification - HMA - Superpave / Caltrans 6,860.00$ Oil Content Correction Factor (ASTM D6307 / CT 382 / AASHTO T308) 689.00$ JMF Production Startup - Superpave / Caltrans 6,382.00$ Gradation from Extraction (ASTM D5444 / AASHTO T30) 180.00 $ RAP Material Testing - Additional Fee 830.00 $ Bulk Specific Gravity (CT308 / AASHTO T275 / ASTM D2726) 84.00 $ Rubberized RHMA Material - Additional Fee 1,915.00$ HMA Theo. Max Density Rice Method (ASTM D2041 / CT 309 / AASHTO T209) 331.00$ JMF Mix Design, HVEEM 4,095.00 $ Volumetric Calculations (VMA, VFA, DP, AV, Eff. Calcs) 70.00 $ JMF Mix Design, Marshall 4,858.00 $ Moisture Content of Asphalt (CT 370 / AASHTO T329) 87.00 $ Open Graded Asphalt Optimum Bitumen Content (CT 368) 2,924.00$ Film Stripping 117.00 $ Gyratory Compaction - Set of 3 (AASHTO T312) 442.00$ Compaction/Preparation of HMA Briquette (CT 304) 290.00 $ Hamburg Wheel Track (AASHTO T324) 2,625.00 $ Stabilometer Value - Set of 3 (CT366) 368.00 $ Tensile Strength Ratio (CT 371 / AASHTO T283) 1,449.00$ Lab Mixed TSR - Moisture Induced Damage (AASHTO T283 / CT 371) 1,943.00$ Marshall Maximum Density (ASTM D6926) 386.00 $ Calculated AC Maximum Density (CT 367) 131.00 $ Marshall Stability & Flow (ASTM D6927) 331.00 $ Thickness Determination of AC Cores 28.00 $ Compression Test Concrete - Per Cylinder (ASTM C39) 37.00$ Flexural Test per Beam (ASTM C78 / CT 523) 118.00 $ Compression Test Concrete - Set of 4/5 (ASTM C39) 180.00$ Linear Shrinkage - Set of 3 (ASTM C157) 525.00 $ Compression Test of Core (ASTM C42) 80.00 $ Unit Weight Lt Wt Concrete (ASTM C567) 74.00 $ Compressive Strength of Shotcrete Panel 420.00 $ Splitting Tensile Strength of Concrete (ASTM C496) 158.00 $ Compression Test Composite CMU Prism (1) 218.00 $ Compressive Strength CMU Block (ASTM C140) 252.00 $ Compression Test Grout (Set of 4) 159.00 $ Comp. Strength, SG, & Abs. of CMU - Per Block (ASTM C140) 290.00 $ Compression Test Mortar (Set of 3) 145.00 $ Masonry Linear Shrinkage (ASTM C426) 532.00 $ Masonry Core Shear Test (Title 24) 248.00 $
Tensile & Bend of Rebar #3-11 195.00 $ Brinell Hardness of Steel (ASTM E10) 131.00 $ Slip and Tensile Rebar Couplers (CT 670) 284.00 $ Rockwell Hardness of Steel (ASTM E18) 131.00 $ Bolt Proof & Ultimate Load 338.00 $ Face Bend of Steel Coupon 80.00 $ Bolt Hardness - Set of 3 225.00 $ Root Bend of Weld Coupon 80.00 $ Nut Proof Load - Set of 3 338.00 $ Side Bend of Weld Coupon 80.00 $ Nut Hardness - Set of 3 225.00 $ Tensile Test of Steel Coupon 110.00 $ Washer Hardness - Set of 3 225.00 $ Bend Test of Steel Coupon 95.00 $ Dry Density Fireproofing (ASTM E605) 125.00 $ Adhesion / Cohesion Fireproofing Materials 167.00 $
METALS & FIREPROOFING
Escalation: The prices noted below are subject to an increase of 5% annually, effective July 1 of each year following the initiation of a services agreement.
MATERIALS LABORATORY TESTS
Standard Rate Applies to Normal Testing Schedule. Rush Order Turnaround Time Charged at 1.5 x Standard Unit Rates.
HOT MIX ASPHALT
CONCRETE & MASONRY
SOILS & AGGREGATES
BSK Fee Schedule 2024-2