RESOLUTION NO. 2025---

A RESOLUTION OF THE CITY COUNCIL OF

THE CITY OF MERCED, CALIFORNIA,
ASSURING TIMELY DELIVERY FOR THE 2025

CONGESTION MITIGATION AND AIR QUALITY
(CMAQ) PROGRAM APPLICATIONS WITH

MERCED ASSOCIATION OF GOVERNMENTS
(MCAG)
WHEREAS, the City of Merced is eligible to receive Federal and/or State funding for certain transportation projects through the California Department of Transportation; and,
WHEREAS, Merced Association of Governments issued a call for projects for the next round of Congestion Mitigation and Air Quality (CMAQ), and Carbon Reduction Program (CRP) projects in August 2025; and,
WHEREAS, on November 3, 2025, City Council directed staff to apply for one sidewalk project in the City of Merced for the Congestion Mitigation and Air Quality (CMAQ) Program; and,
WHEREAS, Merced Association of Governments requires project assurance for timely delivery of programmed projects.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MERCED

DOES HEREBY RESOLVE, DETERMINE, FIND, AND ORDER AS
FOLLOWS:

SECTION 1. That the City of Merced authorizes one application to MCAG for the 2025 Congestion Mitigation and Air Quality Call for Projects as described in Attachments A.

SECTION 2. That the City of Merced assures Timely Delivery of said Programmed Project, as described in Attachments A.

I I I
I I I
X:\Resolutions\2025\Engineering\CMAQ Resolution 2025.docx 1 Attachment 1
PASSED AND ADOPTED by the City Council of the City of Merced at a regular meeting held on the __ day of _____ 202 5, by the following vote:

AYES: Council Members:

NOES: Council Members:

ABSENT: Council Members:

ABSTAIN: Council Members:

APPROVED:

MATTHEW SERRATTO, MAYOR
Mayor
ATTEST:

D. SCOTT MCBRIDE, CITY CLERK
BY: ------------
Assistant/Deputy City Clerk
(SEAL)
APPROVED AS TO FORM:

CRAIG J. CORNWELL, CITY ATTORNEY
� � ('O /e/4oz5
c· ttomey Date
X:\Resolutions\2025\Engineering\CMAQ Resolution 2025.docx 2 Congestion Mitigation & Air Quality (CMAQ) Program
and
Carbon Reduction Program (CRP)
Application Packet
August 22, 2025
Co
ntact:

Christopher Winkels
[email protected]
209-723-3153 ext. 127
App
lication deadline:

October 24, 2025
Mer
ced County Association of Governments
369 West 18th Street
Merced, CA 95340
209-723-3153
http://www.mcagov.org
Attachment A
CMAQ/CRP Call for Projects (Summer 2025) Merced County Association of Governments (MCAG) 1 Introduction and Timeline

The Merced County Association of Governments (MCAG) is issuing a Call for Projects for the Congestion Mitigation and Air Quality (CMAQ) Program. MCAG’s seven member agencies (the cites of Atwater, Dos Palos, Gustine, Livingston, Los Banos, Merced and Merced County) and the region’s two public transit agencies (the Transit Joint Powers Authority for Merced County and Yosemite Area Regional Transportation System) may apply. There is approximately $8 million available for this call for projects.

CMAQ projects must document their emissions reductions and they must be able to meet all federal project requirements. It is important to note that even if only one phase is federally funded, the entire project and all phases must meet federal requirements. There are a number of requirements for federal projects, such as federal environmental clearance, required bidding processes, and much more. Projects must be programmed in the Federal Transportation Improvement Program (FTIP) and must obtain federal funding obligation (E-76) before bidding any federally-funded project phases and in order to be reimbursed for incurred, eligible costs.

Local agencies will work with Caltrans on implementation of projects once they are authorized and programmed by the MCAG Board. MCAG approves projects based on local scoring criteria and the information in project applications; project specific requirements and project eligibility will ultimately be determined by Caltrans on behalf of the US DOT.

Agencies may submit multiple projects. The CMAQ committee will evaluate and score the projects and make a recommendation of projects for programming. If your project was on a waiting list from the last call for projects and did not get programmed it does not carry over – you must apply again. The Governing Board is expected to consider projects for award in December 2025.

Project applications are due by 5 pm on October 24, 2025.

About CMAQ

The Congestion Mitigation and Air Quality (CMAQ) Improvement Program is a federal funding program.

The purpose of the program is to fund transportation projects or programs that will contribute to attainment or maintenance of National Ambient Air Quality Standards (NAAQS). Funding can be expended on projects to reduce ozone and particulate matter and precursor emissions – nitrogen oxides (NOx), volatile organic compounds (VOC), and particulate matter (PM).

Information about the program can be found on the US DOT website here:
https://www.fhwa.dot.gov/environment/air_quality/cmaq/

The most recent program guidance was published in 2013 and can be found here:
https://www.fhwa.dot.gov/environment/air_quality/cmaq/policy_and_guidance/2013_guidance/cmaq 2013.pdf
Eligible Projects

Some examples of eligible projects include:

CMAQ/CRP Call for Projects (Summer 2025) Merced County Association of Governments (MCAG) 2 • Traffic flow improvements (e.g. roundabout, signal synchronization, etc.); • Bicycle and pedestrian projects;
• Electric vehicle charging stations;
• Ridesharing, carpooling, and vanpooling projects/programs; and • Transit service expansion and transit capital.

Examples of ineligible projects:

• Projects that add new capacity for single-occupancy vehicles; • Maintenance and rehabilitation / reconstruction projects, including rehabilitation of existing bicycle lanes.

Cost-Effectiveness Policy

Since 2011, all San Joaquin Valley Metropolitan Planning Organizations (MPOs), including MCAG, adopted policies for distributing at least 20% of CMAQ funds to projects that meet a cost-effectiveness threshold for emission reductions. The cost-effectiveness threshold is periodically updated and is currently $88 per pound. Projects meeting this threshold (≤ $88/lb.) will receive 20 points during application scoring. If there is a shortage of projects that meet this threshold, then the funding shortfall will remain unprogrammed and available for future/additional projects that can use those funds.

The base methodology for calculating cost-effectiveness is the 2005 ARB “Methods to Fund the Cost- Effectiveness of Funding Air Quality Projects”. This report is available here:
https://ww2.arb.ca.gov/sites/default/files/classic/stcd/CMAQ%20EFs/Cost%20Effectiveness%20Tables% 202024%20final.pdf . S inc e the methodologies are approaching twenty years old and some project types are outdated, the California Air Resources Board (CARB) updates the emissions factors every year or two. New emissions factors must be used as inputs into the methodology to calculate the cost- effectiveness of projects. The most recent emissions factors were adopted in September 2024 and are integrated into the emissions spreadsheets.

Utilizing this ARB cost-effectiveness methodology and the most current emission factor tables, staff has prepared a standardized spreadsheet for applicants to use. The result should be submitted along with the application.

Other methodology may be used for projects not included in the guidance upon review by MCAG staff. It is important that inputs into projects are reasonable and that projects can be reviewed against one another fairly. Cost-effectiveness for CMAQ projects should be expressed as dollars spent per pound of pollutant reduced. Cost-effectiveness is based on CMAQ dollars only (not total project cost).

Example Formula

Cost-Effectiveness = (Capital Recovery Factor * CMAQ Funding) / (ROG + NOx + PM2.5 + PM10)

CMAQ/CRP Call for Projects (Summer 2025) Merced County Association of Governments (MCAG) 3 Policies and Procedures for Programming CMAQ Funds
The updated Policies and Procedures were adopted by the MCAG Governing Board at the August 2024 meeting. They are available on MCAG’s CMAQ webpage: https://www.mcagov.org/218/Congestion- Mitigation-and-Air-Quality
Application Requirements
All project applications must document all of the following information:

• Project’s total cost and CMAQ cost, by phase and by year; • Engineer’s Estimate;
• Cost-effectiveness of CMAQ dollars;
• Project map/depiction;
• Project schedule;
• Proof of public vetting; and
• Assurance of timely delivery of programmed projects (via board/city council action). This must be received prior to MCAG Governing Board approval of projects on December 18, 2025. It is not required in order to submit project applications by October 24th.

Application Scoring
Staff will review and assess project applications for their completeness and CMAQ eligibility. The CMAQ Scoring Committee will evaluate and score project applications. The following scoring factors will be used to rank the project applications:

• Cost-effectiveness: 20 points
o Priority is given to Highly Cost-Effective projects (< $88/lb.) o The full 20 points will be awarded to projects that score $88/lb or better, with the following exceptions:
 There is limited funding available for PM10 projects (dust-reducing projects such as paving alleyways or road shoulders). There are a number of reasons for this.

PM10 is no longer a primary pollutant in the San Joaquin Valley air basin; great strides have been made in PM10 reduction over the last few decades and instead of being out of compliance with federal standards we are in attainment for the pollutant. Federal regulations set a floor for funding that must be directed to projects that reduce PM2.5 specifically. Also, scoring criteria by particle weight gives a disproportionate advantage to these project types.  Street sweepers with emissions calculations relying on PM10 reductions will be included in this project-type limit. Street sweepers may reduce both PM10 and PM2.5 so it is possible that they can be funded on PM2.5 emissions alone.

• Vehicle Miles Traveled Reduction: 10 points
o Reduction of Vehicle Miles Traveled (VMT) results in reduction of GHG emissions

• Benefits Disadvantaged Community: 10 points
o See https://calepa.ca.gov/EnvJustice/GHGInvest/
o Partial points could be awarded if:
 project location is partially in a disadvantaged community, CMAQ/CRP Call for Projects (Summer 2025) Merced County Association of Governments (MCAG) 4  if not in a disadvantaged community, but benefits to one which could be explained.

• Subjective Evaluation: 15 points
o Such considerations may include, but are not limited to: connectivity, accessibility, improving quality of life, and supportive of economic activity.

• Safety: 10 Points
o Project implements transportation safety measures to increase transportation safety for travelers such as drivers, cyclists, and pedestrians.

• Project Readiness: 10 Points
o Considerations may include, but are not limited to: Right of Way Acquisition, other sources of funding, coordination with corporate or governmental agencies, etc.

Scoring Committee
The scoring committee consists of one representative from each of the following agencies:

• City of Atwater;
• City of Dos Palos;
• City of Gustine;
• City of Livingston;
• City of Los Banos;
• City of Merced;
• County of Merced;
• Caltrans District 10; and
• MCAG.

Schedule
The following is the tentative/anticipated schedule:

August 21 Approve Policies and Procedures and authorize Call for Projects August 22 Release Call for Projects
October 24 Deadline for applications
Week of November 10 CMAQ committee evaluates applications December 18 Governing Board action (estimated)

CMAQ/CRP Application (Summer 2025) Merced County Association of Governments (MCAG) CMAQ Application 1
CMAQ/CRP Project Application

Applications must be received by 5 pm October 24, 2025.

Submit an electronic copy to:

[email protected]

Agency (project applicant):

City of Merced

Project Title:

Childs Ave and Canal Street Sidewalks

Project Point of Contact (name, title, email, and phone #):

Joe Cardoso, City Surveyor, [email protected], 209-388-7508

Project Description:

The City of Merced proposed to install pedestrian improvements along the west side of Canal Street and the south side of Canal Street.

The project scope would include installing approximately 850 feet of sidewalk on Canal Street and approximately 950 feet on Childs Avenue. This would also include installing adding street striping, crosswalks, street signs, access ramps, streetlights, shoulder paving, and drainage.

The project is within the City right-of-way and includes some minor utility relocations such as utility service pole, telephone riser and raise utility boxes to grade.

Project Cost ($):

CMAQ
(88.53% Max.)
Other
(if any)
Local
(11.47% Min.) Total
Prelim. Engineering (PE)
Right-of-Way (R/W)
Construction $951,817 $1,100,000
TOTAL

Please add an asterisk to your CMAQ cost if it has already been awarded and programmed. For example, if your PE has already been awarded, denote it as $100,000* in the CMAQ column. For new funding requests, do not add the asterisk.

Source of Other funds, if any:

CMAQ/CRP Application (Summer 2025) Merced County Association of Governments (MCAG) CMAQ Application 2
Source of Local funds: $689,805 is budgeted through LTF and $410,195 will be provided by Measure V and SB1. The City is funding approximately 53.61% of this project through local funds. See Attachment A for additional information.

Please add additional pages or backup as needed.

Project Schedule:

When will you be ready to begin each phase? For federally-funded phases when will you be ready to submit your Request for Authorization (RFA) or FTA transfer to Caltrans? These will be your committed project implementation dates. Include all phases that apply to your project regardless of funding source.

Start
Month/Year
Estimated Completion
Month/Year
Prelim. Engineering (PE) 1/2026 5/2026
Right-of-Way (R/W) N/A n/A
Construction 9/2026 03/2027

Project Cost-Effectiveness (in dollars/pound) (attach calculations):
$651 (see attached)

Additional Information (attach more sheets if needed). Projects will be evaluated subjectively based on this supporting information:

The Childs and Canal Infrastructure Project has been a priority for the City of Merced for several years. It has been discussed at many City Council meetings and identified as a critical project on the City Council’s annual goals and priorities. The City submitted this project for federal earmark funding in 2023, 2024, and 2025, showing its continued commitment to moving the project forward. Letters of support from the Merced City School District, the Merced County Association of Governments, and South Merced community members demonstrate strong local and regional backing. This support reflects a shared goal to improve safety, access, and quality of life for residents in South Merced. See Attachment A for further information.

Proof of Public Vetting:

The Childs and Canal Infrastructure Project has undergone extensive public vetting through multiple City Council and Planning Commission meetings, as well as community town hall meetings. These discussions have provided opportunities for public input and have consistently emphasized the community’s priority to make the area safer for both motorists and pedestrians. The continued dialogue and engagement demonstrate broad public awareness, support, and involvement in shaping this critical infrastructure project.

CMAQ/CRP Application (Summer 2025) Merced County Association of Governments (MCAG) CMAQ Application 3
Assurance of Project Delivery by Formal Board/City Council Action? If this is completed please enter ‘YES’ and attach documentation. If not, please enter ‘NO’ and provide the date this will be provided. (Must be provided before November 20, 2025).

No. The resolution is scheduled for City Council approval on November 3, 2025.

ATTACHEMENT A

COST- EFFECTIVENESS
The proposed project currently has budgeted $689,805 of LTF funding. The additional $410,195 will be provided by Measure V and SB1. The City will fund approximately 53.61% of the project using local funds and is requesting that approximately 46.38% of the sidewalk portion be funded through CMAQ.

The total cost of the project is $2,051,817.
• CMAQ will fund $951,817 which include the following:
o Clear & Grubbing, remove curb & gutter, existing sidewalk signs. o Install sidewalks, curb & gutter, access ramps, construct driveways, install streetlights and connect to power and portions of permits bonds & insurance, public safety, restoration, and surveying.
• City funds will fund $1,100,000 which include the following:
o Remove existing pavement.
o Install asphalt pavement, catch basins, HDPE storm drains, raise utilities to grade, remove tree, monumentation, and portions of permits bonds & insurance, public safety, restoration, and surveying.

VEHICAL MILES TRAVELED
Canal Street is a two-lane local road with dirt shoulders on the east side. Childs Avenue is also a two-lane road but is classified as a collector road with dirt shoulders on the south side.

Canal Street and Childs Avenue offset creating an unsafe intersection for pedestrians and vehicular traffic. This project will allow the City to provide a safe place for bicyclist, pedestrians and improve the flow of traffic by eliminating the off-set intersections.

BENEFITS DISADVANTAGE COMMUNITY
The City of Merced is recognized as an Entitlement City under the U.S. Department of Housing and Urban Development (HUD) and qualifies as a disadvantaged community based on state and federal criteria. With a diverse population and areas experiencing economic hardship, Merced faces challenges related to income inequality, limited access to resources, and infrastructure needs. These factors underscore the importance of continued investment through programs like the CMAQ grant to enhance public engagement, improve air quality, and support equitable community development across all neighborhoods.

SUBJECTIVE EVAUATION
• The project will install approximately 850 feet of sidewalk on Canal Street and approximately 950 feet on Childs Ave.
• Improved access to vital amidites to nearby health centers, schools, cemeteries, and the County Fair Grounds.
• Enhance overall walkability and promote a healthier lifestyle.

SAFETY
• This project will create a safe, dedicated passage for pedestrians and bicyclists, physically separating them from vehicular traffic to reduce the risk of collisions. • It will enhance safety for school children traveling to and from Alicia Reyes Elementary School by providing secure, accessible routes. • The project will realign Canal Street with the north segment of Canal Street, eliminating the current offset that causes long vehicle idle times and unsafe crossing conditions, improving overall traffic safety for motorists and pedestrians alike.

PROJECT READINESS
• In November 2023, the City retained our LAPM Chapter 10 vetted on-call civil engineers and hired NorthStar Engineering Group to design the Childs and Canal Infrastructure Project. The design contract is funded through Local Transportation Funds (LTF) for $134,361.34.
• To date, the 60 percent design plans have been completed and are currently under review by City staff.
• If the project receives funding, we anticipate bidding it in early Summer 2026, or as soon as the required right-of-way certification is obtained.

ATTACHEMENT B
(Project Photos)

Intersection of Childs Ave and Canal Street looking east towards State Route 59.

Intersection of Childs Ave and Canal Street looking west towards Alicia Reyes Elementary School.

Childs Avenue looking east towards State Route 59.

Childs Ave at the intersection on of State Route 59.

Canal Street looking south.

Canal Street looking north towards Childs Ave from the southerly portion of the project.

BIKELANE

BIKELANE

SIGNALAHEADBIKELANESTOP STOP

STRATFORD CT

S CANAL STSEVILLE WAY

CARTMELL DR

W CHILDS AVE
STATE ROUTE 59

CANAL ST

PROJECTLOCATIONW CHILDS AVES N ST
S M ST

S CANAL ST

S N STS M STS CANAL ST
STATE ROUTE 59
ST RTE 59

SEVILLE WAY

BRITTANY WAY

W GERARD AVE

COVER SHEET

AS SHOWN
BENCHMARKELEVATION:166.511" BRASS DISK IN TOP OF CURB ON WEST SIDE OF STATEROUTE 59, APPROXIMATELY 50' NORTH OF INTERSECTIONWITH W. CHILDS AVENUEBM SHEET INDEXGENERAL INFORMATION1.C1.1COVER SHEET2.C1.2LEGENDS AND ABBREVIATIONS3.C1.3GENERAL NOTES AND SPECIFICATIONS4.C1.4DETAILS AND CROSS SECTIONS5.C1.5OVERALL SITE PLANSITE PLANS6.C2.1TOPOGRAPHIC AND DEMOLITION PLAN7.C3.1DIMENSION AND PAVING PLAN8.C4.1GRADING AND DRAINAGE PLAN9.C4.2GRADING AND DRAINAGE PLAN10.C5.1COMPOSITE UTILITY PLAN11.C6.1S. CANAL STREET (STA. 14+00 TO 22+00)12.C6.2S. CANAL STREET (STA. 21+00 TO 29+00)13.C6.3W. CHILDS AVENUE (STA. 21+00 TO 27+50)14.C6.4W. CHILDS AVENUE (STA. 26+50 TO 32+50)EROSION CONTROL PLAN15.C7.1EROSION CONTROL PLAN16.C7.2EROSION CONTROL PLAN, NOTES AND DETAILS

CIVIL IMPROVEMENT PLANS FORCANAL STREET AND CHILDS AVENUEMERCED, CALIFORNIA 01" = 8040 8080'

VICINITY MAP
CONTACTSA. OWNER/DEVELOPER:CITY OF MERCED678 W 18TH STREETMERCED, CA. 95340B. PROJECT LOCATION:CANAL STREET AND CHILDS AVENUEMERCED, CA. 95341C. ENGINEER:NORTHSTAR ENGINEERING GROUP, INC.620 12TH STREETMODESTO, CA. 95354T: (209) 524-3525F: (209) 524-3526CONTACT: CHRIS VANDERVEEN

APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 06/30/2025 16:52 PLOTTED BY: TtophamDWGNAME: F:\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C1.1 CVR.dwg C1.1COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC 23-3406CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION

LEGENDS ANDABBREVIATIONS

AS SHOWN
ABBREVIATIONSBOUNDARY LINECENTERLINERIGHT-OF-WAYLOT LINESECTION LINEEASEMENTRIGHT-OF-WAY EASEMENTSETBACK LINERESTRICTED ACCESSCENTERLINE STATION POINTMONUMENTPROPERTY CORNERBENCHMARKTREEBOULDERSTUMPCONCRETECURB + GUTTERACCESSIBLE RAMPDETECTABLE WARNING SURFACEEDGE OF PAVEMENTBUILDING OVERHEADRAILROADBUILDINGWHEEL STOPHANDRAILBOLLARDDOORVALLEY GUTTERWALLWALLRETAINING WALLFENCE - CHAINLINK/VINYL/CABLEFENCE - WOOD/METAL/STEELFENCE - BARBED WIREFENCE - PICKETFENCE - SPLIT RAILFENCE - HOGWIREBARRICADEGUARDRAILROLLING GATESWING GATETRENCHSAWCUTUTILITY REMOVALCONTOUR - MAJORCONTOUR - MINORDAYLIGHT CUTDAYLIGHT FILLGRADE BREAKPAD ELEVATIONSLOPEELEVATION TAGTOE OF SLOPEHIGH POINTSIGNSINGLE LINEDOUBLE LINESTOP BAR/CROSSWALKDASHED LINEDOUBLE DASHED LINEMANHOLEMAILBOXUTILITY STRUCTUREWATER VALVEWATER METERBLOW OFF VALVEBACKFLOW PREVENTERDOUBLE CHECK DETECTOR ASSEMBLYFIRE HYDRANTMONITORING WELLAIR RELEASE VALVEMW1

ICVBFPIMICB
ARV
BO
W
US
BFPWM

RWLSDNN
12"SD
LEGEND
UP
UTL

UTLUP N/AN/AN/A
N/AN/A
N/A
N/A
SEPTIC
N/A
N/A
N/AN/A
SEPTIC
MH-112"SS

WATER WELLWATER (DOMESTIC)WATER (NON-POTABLE WATER)WATER (FIRE SERVICE)WATER STRUCTURE IDIRRIGATION MANHOLEIRRIGATION METERBACKFLOW PREVENTERIRRIGATION CONTROL BOXIRRIGATION CONTROL VALVEIRRIGATION LINEGAS VALVEGAS METERGAS LINEELECTROLIERSITE LIGHTINGTRAFFIC SIGNALTRAFFIC SIGNAL WITH STREET LIGHTUTILITY POLEUTILITY POLE WITH LIGHTWIRE ANCHORUTILITY BOXTELEPHONE MAINTENANCE HOLEELECTRIC MAINTENANCE HOLECABLE MAINTENANCE HOLETRANSFORMEROUTLETUTILITY VALVEJOINT TRENCHOVERHEAD ELECTRICALTELEVISION/CABLEUNDERGROUND ELECTRICALTELEPHONEELECTRICALMISCELLANEOUS UTILITYSEWER MANHOLEECCENTRIC SEWER MANHOLESEWER CLEAN OUTSEPTIC TANKSEWER STRUCTURE IDSEWER (MAIN)SEWER (LATERAL)SEWER (FORCE MAIN)STORM DRAIN MANHOLEDEWATERING MANHOLEECCENTRIC MANHOLESTORM DRAIN CLEAN OUTCURB INLETDRAIN INLETDRAIN INLET ON MANHOLESTORM DRAIN STRUCTURE IDRAINWATER LEADERRIPRAP (ROCK DISCHARGE PAD)STORM DRAINSTORM DRAIN TRENCH DRAINSWALESTORM DRAIN (LANDSCAPE SERVICES)ROCK TRENCHFRENCH DRAINCULVERT N/AN/A
MW1
N/A
N/AN/A
ICV

IMBFPICB
BO
W

USWMBFP
ARV
RWLEx12"SD

10.0 GASGAS

N/AN/AN/A
N/A

GVGM GVGM

DCDADCDA
MAIL

PROPOSEDEXISTING PROPOSEDEXISTING
FH-1

DCDADCDA
UP
UTL
UTLUP
3232 3232

10.0 Ex8"WEx8"NPWEx8"FS8"NPW8"FSN/A
N/A
MAIL

00.00 CC00.00 CC
WVWV
Ex12"FM
±@ØABABDNACA/CACPACMADADAAGAGGALGNALTAPNARVASBASPHASRBCBDRYBFPBKBLDCBLDGBMPBMBOBODBOLBOWBSWBSBSLBVCBWCCCCBCBLCDSCG/C&GCG&SCICIP℄OR CLCLRCMHCMNCMPCOCOM OR C.O.M.COMP.CONC OR CCCONSTCONFCRCT.CUCVCYD=DCDADEMODEPTDIDIADIPDOM, (DOM)DRDSDTLDWDWGDWYDYLE(E)ECEGEL, ELEVELBELC/ELECELVEMEMHEPESESMT OR EASEEVCEX OR EXISTEVA(F)FAFABFC, F/CFDFDCFEFESFFFFEFGFHFIPTFLFLGFMFOUNDFSFSRFTFWGGBGEGIGMGRGRDGSGUYGVH2OHBHMAHORIZHTHPHPSHTHWYHWLIBXICBICVIHWIMIMHIDINVINSTIRRISPIV JBJPJTJPL, LTL=LFLATLIPLNLPFHLSLSAMAMAXMCMEPMHMIDMINMIPTMJMPVCMONMSMWN(N)NDSNICNONSENTSOCOGOHEO.R.(P)P, PAVPBPCCPCCPEPEDPERFPGPG&EPHPIDPIVPLPMPMHPOPOCPOIPPPRCPROFPRVPRUEPTPT&TPUEPVCRR=RCRCPRDRJRPRPPARSCRVRWRW, R/W, ROWRWLSS.A.D.SBLSCOSDSDBSDCBSDCOSDDWSDISDFMSDMHS.E.D.SGSFSHTSIMSLS.L.D.SLBSMHS.M.D.SNSSPS.P.DSRLSSSSCOSSFMSSMHSSPSSTSTASTDSTLS/W, SWSWLTTCTBCTCPTDTELTELBTELVTEMPTFCTGTHTHKTITMHTODTOWTPTPETSTSBTSCETSPTVTVRTYPU/UTIL/UTLUG, U/GUONUOS

USA-BUSA-GUSA-MUSA-OUSA-PUSA-RUSA-WUSA-YVCVCPVERTWW/WAWBWMWMBWOAWSWVWWWWFWYYD

PLUS OR MINUS (NOT EXACT)ATDIAMETERAGGREGATE BASEABANDONEDACRE, ASPHALT CONCRETEAIR CONDITIONINGASBESTOS CEMENT PIPEASBESTOS CONTAINING MATERIALAREA DRAINAMERICANS W/ DISABILITIES ACTATRIUM GRATEAGGREGATEALIGNMENTALTERNATEASSESSORS PARCEL NUMBERAIR RELEASE VALVEAGGREGATE SUBBASEASPHALTAUTOMATIC SPRINKLER RISERBEGIN CURVEBOUNDARYBACK FLOW PREVENTORBOOKBUILDING CORNERBUILDINGBEST MANAGEMENT PRACTICESBENCHMARKBLOW OFFBOTTOM OF DOCKBOLLARDBACK OF WALKBACK OF SIDEWALKBEGIN STRIPINGBUILDING SETBACK LINEBEGIN VERTICAL CURVEFINISHED GRADE AT BOTTOM OF WALLCIVILCONCRETECATCH BASINCABLECONTINUOUS DEFLECTIONCURB AND GUTTERCURB, GUTTER & SIDEWALKCAST IRON/CURB INLETCAST IRON PIPECENTER LINECLEARCABLE MAINTENANCE HOLECOMMUNICATIONCORRUGATED METAL PIPECLEAN OUTCITY OF MERCEDCOMPACTIONCONCRETECONSTRUCTION OR CONSTRUCTCONFORM TO EXISTINGCURB/CROWNCOURT/CUBICCULVERTCHECK VALVECUBIC YARDDELTA (CURVE)DOUBLE CHECK DETECTOR ASSEMBLYDEMOLISHDEPARTMENTDROP/DRAIN INLET/DUCTILE IRONDIAMETERDUCTILE IRON PIPEDOMESTICDRIVEDOWNSPOUTDETAILDOMESTIC WATER/DRYWELL/DEWATERINGDRAWINGDRIVEWAYDOUBLE YELLOW LINEEAST/EASTING COORDINATE/ELECTRICEXISTINGEND CURVEEXISTING GRADEELEVATIONELECTRIC BOXELECTRICALELECTRIC VAULTELECTRIC METERELECTRIC MAINTENANCE HOLEEDGE OF PAVEMENTEND STRIPINGEASEMENTEND OF VERTICAL CURVEEXISTINGEMERGENCY VEHICLE ACCESSFUTUREFIRE ALARMFIRE ALARM BOXFACE OF CURBFOUND/FRENCH DRAINFIRE DEPARTMENT CONNECTIONFENCEFLARED END SECTIONFINISH FLOORFINISH FLOOR ELEVATIONFINISH GRADEFIRE HYDRANTFEMALE IRON PIPE THREADFLOW LINE/FLANGEFLANGEFLOWMETER/FORCE MAINFOUNDATIONFINISHED SURFACE, FIRE SERVICEFIRE SPRINKLER RISERFOOT, FEETFIRE WATERGAS, GROUNDGRADE BREAKGROUND ELEVATIONGALVANIZED IRONGAS METERGRATEGROUNDGROUND SHOT ELEVATIONGUY/GUIDE LINEGAS VALVEWATERHOSE BIBHOT MIX ASPHALTHORIZONTALHEIGHTHIGH POINTHIGH PRESSURE SODIUM/SYSTEMHEIGHTHIGHWAYHIGH WATER LINEIRRIGATION BOXIRRIGATION CONTROL BOXIRRIGATION CONTROL VALVEIRRIGATION HEADWALLIRRIGATION METERIRRIGATION MAINTENANCE HOLEINSIDE DIAMETERINVERTINSTALLIRRIGATIONIRRIGATION STAND PIPEIRRIGATION VALVE JUNCTION BOXJUNCTION POLEJOINT TRENCHJOINT POLELEFTLENGTH (CURVE)LINEAL/LINEAR FEETLATERALLIP OF GUTTERLANELIGHT POLE, LOW POINTFIRE HYDRANTLANDSCAPELANDSCAPE ARCHITECTMEDICAL AIRMAXIMUMMERCED COUNTYMECHANICAL/ELECTRICAL/PLUMBINGMAN/MAINTENANCE HOLEMERCED IRRIGATION DISTRICTMINIMUMMALE IRON PIPE THREADMECHANICAL JOINTMIDPOINT OF VERTICAL CURVEMONUMENTMOW STRIPMONITORING WELLNORTH, NORTHING COORDINATENEWNDS INC. (MANUFACTURER)NOT INCLUDED/IN CONTRACTNUMBERNORTHSTAR ENGINEERINGNOT TO SCALEON CENTERORIGINAL GROUND / GRADEOVERHEAD ELECTRICALOFFICIAL RECORDSPROPOSEDPAVEMENTPULL BOXPOINT OF COMPOUND/CONVERSE CURVATUREPORTLAND CEMENT CONCRETEPLAIN ENDPEDESTRIANPERFORATEDPAGEPACIFIC GAS AND ELECTRICPOTHOLEPOINT IDPOST/PRESSURE INDICATOR VALVEPROPERTY LINEPARKING METER, PARCEL MAPPOWER MANHOLEPUSH-ONPOINT ON CURVE/POINT OF CONNECTIONPOINT OF INTERSECTIONPOWER POLEPOINT OF REVERSE CURVATUREPROFILEPRESSURE REDUCING VALVEPRIVATE UTILITY EASEMENTPOINTPACIFIC TELEPHONE & TELEGRAPHPUBLIC UTILITY EASEMENTPOLYVINYL CHLORIDE PIPERIGHTRADIUSRELATIVE COMPACTIONREINFORCED CONCRETE PIPEROAD, RELATIVE DENSITYRESTRAINED JOINTRADIUS POINTREDUCED PRESSURE PRINCIPLE ASSEMBLYRECEIVING AND SUPPORT CENTERRESISTANCE VALUERECYCLED WATERRIGHT-OF-WAYRAINWATER LEADERSOUTH, SLOPESEE ARCHITECTURAL DRAWINGSSETBACK LINE, SOLID BLACK LINESEWER CLEANOUTSTORM DRAINSTORM DRAIN BASINSTORM DRAIN CATCH BASINSTORM DRAIN CLEAN OUTSTORM DRAIN DEWATERINGSTORM DRAIN INLETSTORM DRAIN FORCE MAINSTORM DRAIN MAINTENANCE HOLESEE ELECTRICAL DRAWINGSSUB-GRADESILT FENCE SG SUBGRADESHEETSIMILARSTREET LIGHTSEE LANDSCAPE DRAWINGSSTREET LIGHT BOXSIGNAL MANHOLESEE MECHANICAL DRAWINGSSTREET NAME SIGNSERVICE POLESEE PLUMBING DRAWINGSSOLID RED LINESANITARY SEWERSANITARY SEWER CLEAN OUTSANITARY SEWER FORCE MAINSANITARY SEWER MAN/MAINTENANCE HOLESANITARY SEWER PUMP STATIONSTREET, SEPTIC TANKSTATIONSTANDARDSTEELSIDEWALKSOLID WHITE LINE, SWALETELEPHONETOP OF CURBTOP BACK OF CURBTEMPORARY CONTROL POINTTRENCH DRAINTELEPHONETELEPHONE BOXTELEPHONE VAULTTEMPORARYTOP FACE OF GRATETOP OF GRATETHRESHOLDTHICKTRAFFIC INDEXTELEPHONE MAINTENANCE HOLETOP OF DOCKTOP OF WALLTELEPHONE POLE, TEST PITTREE PLANTING EASEMENTTRAFFIC SIGNALTRAFFIC SIGNAL BOXTEMPORARY STABILIZED CONSTRUCTION ENTRANCETRAFFIC SIGNAL POLETELEVISIONCABLE TV RISERTYPICALUTILITYUNDERGROUNDUNLESS OTHERWISE NOTEDUNLESS OTHERWISE SPECIFIED WATER (BLUE)SEWER/STORM DRAIN (GREEN)TEMPORARY SURVEY MARKINGS (MAGENTA)COMMUNICATION CATV (ORANGE)RECLAIMED WATER IRR. SLURRY (PURPLE)ELECTRICAL (RED)PROPOSED EXCAVATION (WHITE)GAS, OIL, STEAM (YELLOW)VERTICAL CURVEVITRIFIED CLAY PIPEVERTICALWEST, WATERWITHWALLWATER BOXWATER METERWATER METER BOXWASHOUT AREAWATER SERVICEWATER VALVEWATER WELLWELDED WIRE FABRICWAYYARD 8"W
Ex4"G 4"G
Ex12"IRR12"IRR
12"SSFMEx12"SS

APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 06/30/2025 16:52 PLOTTED BY: TtophamDWGNAME: F:\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C1.2 L&A.dwg C1.2COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC 23-3406CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION

GENERAL NOTES ANDSPECIFICATIONS

AS SHOWN

1.CONTRACTOR SHALL BE AWARE THAT THE FOLLOWING NOTES LISTED BELOW ARE NORTHSTARENGINEERING GROUP'S TYPICAL GENERAL NOTES AND SOME NOTES MAY NOT BE APPLICABLE TO THISPLAN SET.2.ALL IMPROVEMENTS SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE FOLLOWING: CITYOF MERCED STANDARD SPECIFICATIONS ("CITY") AND THE LATEST EDITION OF THE CALIFORNIABUILDING CODE. WHERE THERE IS A CONFLICT BETWEEN THE PLANS AND THE CITY AND/ORCALIFORNIA BUILDING CODE STANDARDS, THE CITY AND/OR CALIFORNIA BUILDING CODE STANDARDSSHALL PREVAIL. ALL WORK SHALL BE SUBJECT TO THE INSPECTION OF THE CITY OF MERCED.3.PRIOR TO ANY WORK BEING PERFORMED, THE CONTRACTOR SHALL CONTACT THE APPROPRIATEREGULATORY AGENCIES FOR A PRE-CONSTRUCTION CONFERENCE. CONTRACTOR SHALL ALSO NOTIFYTHE PROJECT CONTACTS LISTED ON THIS SHEET FORTY-EIGHT (48) HOURS IN ADVANCE OF SAIDMEETING.4.IT IS INTENDED THAT THESE PLANS AND SPECIFICATIONS REQUIRE ALL LABOR AND MATERIALSNECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND THAT THE WORK BE COMPLETED INACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. THE CONTRACTOR SHALL NOTIFY NORTHSTARENGINEERING GROUP, INC. ("ENGINEER") IMMEDIATELY REGARDING ANY DISCREPANCIES ANDAMBIGUITIES WHICH MAY EXIST IN THE PLANS AND SPECIFICATIONS. IF THE PLANS ORSPECIFICATIONS DESCRIBE PORTIONS OF THE WORK IN GENERAL TERMS BUT NOT IN COMPLETEDETAIL, IT IS UNDERSTOOD THAT ONLY THE BEST GENERAL PRACTICE IS TO PREVAIL AND THAT ONLYMATERIALS AND WORKMANSHIP OF THE FIRST QUALITY ARE TO BE USED.5.IF NORTHSTAR ENGINEERING GROUP, INC. IS TO PERFORM ANY SURVEY STAKING, THENCONSTRUCTION STAKING FOR GRADING, CURB, GUTTER, SIDEWALK, SANITARY SEWER, STORM DRAIN,AND WATER SHALL BE DONE UNDER THE DIRECTION OF THE ENGINEER. THE CONTRACTOR SHALLNOTIFY THE ENGINEER SEVENTY-TWO (72) HOURS IN ADVANCE OF THIS NEED FOR STAKING. ANYSTAKING REQUESTED BY THE CONTRACTOR OR HIS SUBCONTRACTORS THAT IS ABOVE AND BEYONDNORMAL STANDARD STAKING NEEDS AS OUTLINED IN THE CONTRACT, WILL BE SUBJECT TO AN EXTRABACK CHARGE TO THE CONTRACTOR.6.THE CONTRACTOR SHALL EXERCISE DUE CAUTION AND SHALL CAREFULLY PRESERVE BENCH MARKS,REFERENCE POINTS AND ALL SURVEY STAKES, AND SHALL BEAR ALL EXPENSE FOR REPLACEMENTAND/OR ERRORS CAUSED BY THEIR UNNECESSARY LOSS OR DISTURBANCE.7.CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITECONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALLPERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BELIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY ANDHOLD THE OWNER, ENGINEER AND THE CITY HARMLESS FROM ANY AND ALL LIABILITY, REAL ORALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FORLIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER.8.THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT WRITTENAUTHORIZATION FROM THE CITY ENGINEER.9.THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAGMEN, OR OTHER DEVICESNECESSARY FOR PUBLIC SAFETY IN ACCORDANCE WITH THE CURRENT ISSUE OF "MANUAL OF TRAFFICCONTROLS, WARNING SIGNS, LIGHTS, AND DEVICES FOR USE IN PERFORMANCE OF WORK UPONHIGHWAY" PUBLISHED BY THE STATE OF CALIFORNIA BUSINESS AND TRANSPORTATION AGENCY.CONTRACTOR SHALL COORDINATE WITH THE GOVERNING LOCAL AGENCY TO DETERMINE IF ANYCHANGES TO THE CLASSIFICATION OR OPERATION OF A ROADWAY ARE REQUIRED DUE TO THEIMPROVEMENTS SHOWN ON THESE PLANS (SUCH AS SPEED LIMITS, INTERSECTION TYPE, ETC.) ANDSHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY INTERIM TRAFFIC MANAGEMENT MEASURESREQUIRED BY THE GOVERNING AGENCY, INCLUDING TRANSITIONAL SIGNAGE AND STRIPING INPREPARATION OF AND TO BE INSTALLED PRIOR TO COMPLETION AND ACCEPTANCE OF ULTIMATESIGNAGE AND STRIPING. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITHIMPLEMENTING THESE MEASURES.10.THE OFFICE OF THE CITY OF MERCED PUBLIC WORKS SHALL BE NOTIFIED AT LEAST 48 HOURS INADVANCE OF ANY WORK.11.CABLE TV, ELECTRICAL, GAS, AND TELEPHONE UNDERGROUND WORK SHALL BE COMPLETED PRIOR TOCONSTRUCTION OF THE CURB, GUTTER, SIDEWALK AND PAVING.12.THE CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT FROM THE CITY OF MERCED,DEPARTMENT OF PUBLIC WORKS OR ANY OTHER APPLICABLE AGENCY PRIOR TO COMMENCEMENT OFWORK WITHIN EXISTING CITY RIGHT-OF-WAY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALLPERMITS AND LICENSES REQUIRED FOR THE CONSTRUCTION AND COMPLETION OF THE PROJECT.13.THE CITY OF MERCED OR ASSOCIATED UTILITY COMPANY AND RESIDENCES TO BE AFFECTED SHALL BENOTIFIED IMMEDIATELY UPON ANY UTILITY SERVICE DISRUPTION OTHER THAN SPECIFIED ON THESEIMPROVEMENT PLANS AND A TWENTY-FOUR (24) HOUR NOTICE SHALL BE GIVEN FOR ANY PLANNEDDISRUPTION.14.STREET SIGNS, TRAFFIC CONTROL SIGNS, AND PAVEMENT MARKINGS SHALL BE PROVIDED ANDINSTALLED BY THE CONTRACTOR AT LOCATIONS ESTABLISHED BY THE ENGINEER.15.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING IMPROVEMENTS FROMDAMAGE. COST OF REPLACING DAMAGED EXISTING IMPROVEMENTS SHALL BE INCLUDED IN THE UNITPRICE BID FOR ITEMS REQUIRING REMOVAL AND REPLACEMENT.16.CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF THE REMOVAL OR RELOCATION OF ALLEXISTING UTILITIES WITH RESPECTIVE UTILITY COMPANIES.17.ASPHALT CONCRETE SHALL BE PLACED ONLY WHEN THE ATMOSPHERIC TEMPERATURE IS ABOVE 50°FAND RISING.18.DRAWING NUMBERS SHOWN ON THE PLANS REFER TO DRAWINGS CONTAINED IN THE CITY OFMERCED STANDARD SPECIFICATIONS (I.E. DWG. 30).19.ALL TRENCHES IN PAVED AREAS SHALL BE PAVED WITH TEMPORARY PAVING, OR COVERED WITH ASTEEL PLATE OF APPROPRIATE SIZE AND STRENGTH, THE SAME DAY THE PAVEMENT CUT IS MADE.20.WHENEVER PAVEMENT IS BROKEN OR CUT IN THE INSTALLATION OF THE WORK COVERED BY THESESPECIFICATIONS AND PLANS, THE PAVEMENT SHALL BE REPLACED, AFTER PROPER BACK FILLING,WITH PAVEMENT MATERIALS EQUAL TO OR BETTER THAN THE MATERIALS USED IN THE ORIGINALPAVING. THE FINISHED PAVEMENT SHALL BE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.21.PRIOR TO COMMENCING ANY WORK, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE EACHUTILITY COMPANY LOCATED, IN THE FIELD, THEIR MAIN AND SERVICE LINES. THE CONTRACTOR SHALLNOTIFY MEMBERS OF THE UNDERGROUND SERVICE ALERT (U.S.A.) FORTY-EIGHT (48) HOURS INADVANCE OF PERFORMING ANY EXCAVATION WORK BY CALLING THE TOLL-FREE NUMBER (800)227-2600. THE CONTRACTOR SHALL RECORD THE U.S.A. ORDER NUMBER. IT SHALL BE THECONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL EXISTING UTILITIES SO THAT NO DAMAGERESULTS TO THEM DURING THE PERFORMANCE OF THIS CONTRACT. ANY REPAIRS NECESSARY TODAMAGED UTILITIES SHALL BE PAID FOR BY THE CONTRACTOR. THE CONTRACTOR SHALL BE REQUIREDTO COOPERATE WITH OTHER CONTRACTORS AND UTILITY COMPANIES INSTALLING NEW STRUCTURES,UTILITIES AND SERVICE TO THE DEVELOPMENT.22.PAYMENT FOR PAVEMENT WILL BE MADE ONLY FOR AREAS SHOWN ON THE PLANS. REPLACEMENT OFPAVEMENT WHICH IS BROKEN OR CUT DURING THE INSTALLATION OF THE WORK COVERED BY THESESPECIFICATIONS AND PLANS, AND WHICH LIES OUTSIDE OF SAID AREAS, SHALL BE INDICATED IN THECONTRACTOR'S UNIT PRICE FOR PAVEMENT, AND NO ADDITIONAL PAYMENT SHALL BE MADE FORSUCH WORK.23.EXCAVATIONS OF 5 FEET OR MORE IN DEPTH WILL REQUIRE AN EXCAVATION PERMIT FROM THE STATEOF CALIFORNIA DEPARTMENT OF INDUSTRIAL SAFETY. FOR TRENCHES 5 FEET OR MORE IN DEPTH, THECONTRACTOR SHALL COMPLY WITH SECTION 5-1.02A OF THE CALTRANS STANDARDS, CHAPTER 9 OFTHE STATE OF CALIFORNIA LABOR CODE, AND ANY LOCAL CODES OR ORDINANCES.24.WE CALL YOUR ATTENTION TO TITLE 8 CALIFORNIA ADMINISTRATION CODE SECTION 1540 (A) (1) OFTHE CONSTRUCTION SAFETY ORDERS ISSUED BY THE OCCUPATIONAL SAFETY AND HEALTHSTANDARDS BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONS SAFETY AND HEALTH ACT OF 1973AS AMENDED WHICH STATES: (1) PRIOR TO OPENING AN EXCAVATION EFFORT SHALL BE MADE TODETERMINE WHETHER UNDERGROUND INSTALLATIONS; I.E. SEWER, WATER, FUEL, ELECTRICAL LINES,ETC., WILL BE ENCOUNTERED AND IF SO, WHERE SUCH UNDERGROUND INSTALLATIONS ARE LOCATED.WHEN THE EXCAVATION APPROACHES THE APPROXIMATE LOCATION OF SUCH INSTALLATION, THEEXACT LOCATION SHALL BE DETERMINED BY CAREFUL PROBING OR HAND DIGGING; AND, WHEN IT ISUNCOVERED, ADEQUATE PROTECTION SHALL BE PROVIDED FOR THE EXISTING INSTALLATION. ALLKNOWN OWNERS OF UNDERGROUND FACILITIES IN THE AREA CONCERNED SHALL BE ADVISED OFPROPOSED WORK AT LEAST FORTY-EIGHT (48) HOURS PRIOR TO THE START OF ACTUAL EXCAVATION.25.THE CONTRACTOR SHALL MAINTAIN A NEATLY MARKED SET OF FULL-SIZE AS-BUILT RECORDDRAWINGS SHOWING THE FINAL LOCATION AND LAYOUT OF ALL MECHANICAL, ELECTRICAL ANDINSTRUMENTATION EQUIPMENT, PIPING AND CONDUITS, STRUCTURES AND OTHER FACILITIES.AS-BUILT RECORD DRAWINGS SHALL REFLECT CHANGE ORDERS, ACCOMMODATIONS, ANDADJUSTMENTS TO ALL IMPROVEMENTS CONSTRUCTED. WHERE NECESSARY, SUPPLEMENTALDRAWINGS SHALL BE PREPARED AND SUBMITTED BY THE CONTRACTOR TO THE DEVELOPER ANDAPPROVAL AGENCY.26.SIGNING, STRIPING AND PAVEMENT MARKINGS SHALL BE IN STRICT CONFORMANCE WITH THE CITY OFMERCED STANDARDS AND SPECIFICATIONS.

GENERAL NOTESGENERAL NOTES (CONT)

NPDES NOTES

SITE LAYOUT NOTESGRADING NOTES (CONT)

GRADING NOTES

27.PRIOR TO ACCEPTANCE OF THE PROJECT, THE CONTRACTOR SHALL DELIVER TO THE ENGINEER, ONESET OF NEATLY MARKED AS-BUILT RECORD DRAWINGS SHOWING THE INFORMATION REQUIREDABOVE. AS-BUILT RECORD DRAWINGS SHALL BE REVIEWED AND THE COMPLETE AS-BUILT RECORDDRAWING SET SHALL BE CURRENT WITH ALL CHANGES AND DEVIATIONS REDLINED AS APRECONDITION TO THE FINAL PROGRESS PAYMENT APPROVAL AND/OR FINAL ACCEPTANCE.28.AFTER CONSTRUCTION OF ALL IMPROVEMENTS, THE CONTRACTOR SHALL SUBMIT ONE SET OFREPRODUCIBLE PLANS. FINAL INVERT ELEVATIONS FOR SEWER AND STORM DRAIN LINES THAT ARE TOBE EXTENDED FOR FUTURE CONSTRUCTION SHALL ALSO BE SHOWN ON THE "AS-BUILT" PLANS ALL ASPROVIDED BY THE CONTRACTOR.29.THE CONTRACTOR SHALL NOTIFY NORTHSTAR ENGINEERING AT LEAST 48 HOURS PRIOR TO BACKFILLING OF ANY PIPE WHICH STUBS TO A FUTURE PHASE OF CONSTRUCTION FOR INVERTVERIFICATION. TOLERANCE SHALL BE IN ACCORDANCE WITH THE CITY OF MERCED STANDARDSPECIFICATIONS.30.WHENEVER EXISTING FACILITIES ARE REMOVED, DAMAGED, BROKEN, OR CUT IN THE INSTALLATION OFTHE WORK COVERED BY THESE PLANS OR SPECIFICATIONS, SAID FACILITIES SHALL BE REPLACED ATTHE CONTRACTORS EXPENSE, AFTER PROPER BACKFILLING AND/OR CONSTRUCTION, WITH MATERIALSEQUAL TO OR BETTER THAN THE MATERIALS USED IN THE ORIGINAL EXISTING FACILITIES. THEFINISHED PRODUCT SHALL BE SUBJECT TO THE APPROVAL OF THE OWNER, THE ENGINEER, AND THERESPECTIVE REGULATORY AGENCY.31.DUST CONTROL SHALL BE PROVIDED AT ALL TIMES, AT THE CONTRACTOR'S EXPENSE TO MINIMIZEANY DUST NUISANCE AND SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE CITY OFMERCED. CONTRACTOR SHALL OBTAIN A PERMIT FROM CAL WATER FOR USE OF WATER FROM FIREHYDRANTS FOR CONSTRUCTION PURPOSES. THE PERMIT SHALL BE APPROVED BY THE CITY OFMERCED FIRE DEPARTMENT.32.CONTRACTOR SHALL PROVIDE CITY WITH A CERTIFICATE SIGNED BY A REGISTERED CIVIL ENGINEER ORLAND SURVEYOR STATING THAT ALL BUILDING PAD ELEVATIONS ARE IN ACCORDANCE WITH THEAPPROVED GRADING PLAN.33.UNLESS OTHERWISE STATED, ALL STATIONS INDICATED ON THE IMPROVEMENT PLANS AREREFERENCED TO THE CENTERLINE OF THE STREET. ALL STATIONS OFF CENTER ARE PERPENDICULARTO OR RADIALLY OPPOSITE CENTERLINE STATIONS, UNLESS OTHERWISE NOTED.34.DRIVEWAYS ON STREETS TO BE LOCATED IN THE FIELD BY THE ENGINEER AT THE TIME OFCONSTRUCTION. DRIVEWAYS SHALL NOT COINCIDE WITH WHEELCHAIR RAMPS.35.IF THE PROJECT IS SUBJECT TO THE INDIRECT SOURCE REVIEW (ISR) REQUIREMENT, THE CONTRACTORIS REQUIRED TO KEEP DAILY RECORDS OF THE TOTAL HOURS OF OPERATION FOR EACH PIECE OFEQUIPMENT GREATER THAN 50-HORSEPOWER BEING USED ON THE PROJECT SITE DURINGCONSTRUCTION. WITHIN 30 DAYS OF COMPLETING CONSTRUCTION OF EACH PROJECT PHASE, AREPORT SUMMARIZING TOTAL HOURS OF OPERATION BY EQUIPMENT TYPE, MODEL, YEAR, ANDHORSEPOWER FOR EACH PIECE OF CONSTRUCTION EQUIPMENT GREATER THAN 50-HORSEPOWERMUST BE SUBMITTED TO THE AIR DISTRICT. TO ASSIST IN THIS RECORDKEEPING, THE "DETAILED FLEETTEMPLATE" IS AVAILABLE ON THE DISTRICT'S WEBSITE ATHTTP://WWW.VALLEYAIR.ORG/ISR/ISRFORMSANDAPPLICATIONS.HTM. FOR EACH PROJECT PHASE, THEDISTRICT WILL VERIFY THAT THE FLEET DETAILS ACHIEVED THE REQUIRED EMISSION REDUCTIONS. IFTHE CONTRACTOR IS NOT GOING TO MEET THE STANDARDS AND/OR RECORD KEEPING REQUIRED BYTHE AIR DISTRICT, THE CONTRACTOR SHALL NOTIFY THE AIR BOARD PRIOR TO CONSTRUCTION SO THENECESSARY MITIGATION FEE SHALL BE PAID. IF THE AIR BOARD IS NOT NOTIFIED PRIOR TOCONSTRUCTION, THE CONTRACTOR SHALL BE REQUIRED TO PAY THE PENALTY TO THE AIR BOARD.36.PRIOR TO FINALIZING IMPROVEMENTS AND OPENING ROADS THE CONTRACTOR SHALL COORDINATEWITH THE GOVERNING LOCAL AGENCY FOR POTENTIAL TRAFFIC SIGNAGE AND STRIPINGMODIFICATIONS (FOR EXAMPLE, SPEED LIMIT CHANGES OR REDUCTIONS) BEYOND THE PROJECTLIMITS THAT ARE NECESSITATED BY THE CONSTRUCTION OF THE IMPROVEMENTS SHOWN ON THESEPLANS. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH SIGNAGE ANDSTRIPING MODIFICATIONS REQUIRED BY THE GOVERNING AGENCY.37.ANY ASSUMPTION MADE BY THE CONTRACTOR IS NOT THE RESPONSIBILITY OF THE ENGINEER ORDESIGN CONSULTANT. CONTRACTOR SHALL SUBMIT A PRE-BID REQUEST FOR INFORMATION (RFI) FORANY CLARIFICATION NEEDED AND SHALL BE RESPONSIBLE FOR COMPLETING THE PROJECT AT THECONTRACTOR'S EXPENSE FOR ANY WRONG ASSUMPTIONS MADE.

1.EARTHWORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CITY OF MERCED STANDARDS ANDTHE PROJECT SOILS REPORT. ALL FILL AREAS SHALL BE TESTED AS REQUIRED BY CITY OF MERCEDAND SHALL BE PAID FOR BY THE CONTRACTOR.2.THE DEVELOPER SHALL BE RESPONSIBLE FOR COST OF INITIAL TEST FOR MOISTURE DENSITY CURVE.IF THE FIRST TEST FAILS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR COST OF ALL SUBSEQUENTCURVES AND TESTS.3.THE CONTRACTOR SHALL REVIEW SITE PRIOR TO BIDDING. ALL VEGETATION AND DELETERIOUSMATERIALS SHALL BE REMOVED FROM THE SITE AT THE EXPENSE OF THE CONTRACTOR AND SHALL BEINCLUDED IN THE LUMP SUM CLEARING COST.4.THE CONTRACTOR SHALL PRESERVE ALL STAKES AND POINTS SET FOR LINES, GRADES ORMEASUREMENT OF THE WORK IN THEIR PROPER PLACES UNTIL AUTHORIZED TO REMOVE THEM BY THEENGINEER. ALL EXPENSES INCURRED IN REPLACING STAKES THAT HAVE BEEN REMOVED WITHOUTPROPER AUTHORITY SHALL BE PAID FOR BY THE CONTRACTOR.5.CONTRACTOR'S PRICE SHALL INCLUDE COST TO ACHIEVE A BALANCED SITE. IT IS THE CONTRACTOR'SRESPONSIBILITY TO IMPORT AND EXPORT MATERIAL AS REQUIRED TO BALANCE SITE.6.CONTRACTOR SHALL GRADE ALL LANDSCAPE AREAS TO WITHIN 0.10 FEET OF FINAL GRADEELEVATIONS WITH APPROPRIATE LANDSCAPE SECTIONS INCLUDED.7.ALL A.C. PAVING SHALL BE FOG SEALED PER SECTION 37 OF CALTRANS STANDARD SPECIFICATIONS,THE LATEST EDITION.8.GRADE TAGS LOCATED ON CURBS REFERENCE TOP OF CURB ELEVATION UNLESS OTHERWISE NOTED.ADDITIONAL DESCRIPTIONS ARE PROVIDED TO DENOTE HORIZONTAL AND VERTICAL CHANGES INACCORDANCE WITH ABBREVIATIONS DEFINED ON COVER SHEET.9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING HIS OWN EARTHWORK QUANTITIES FORBIDDING, CONTRACT AND CONSTRUCTION PURPOSE. IF IT APPEARS THERE WILL BE AN EXCESS ORSHORTAGE OF MATERIAL, THE CONTRACTOR SHALL NOTIFY THE ENGINEER TO DETERMINE IF POSSIBLEGRADE ADJUSTMENTS CAN BE MADE.10.SITE CONTRACTOR SHALL COORDINATE WITH BUILDING CONTRACTOR TO ACCOMMODATE THE PROPERCLEARANCE BETWEEN THE BOTTOM OF THE STUCCO AND THE TOP OF THE GRADE TREATMENT ALONGTHE BUILDING AS APPLICABLE, IN ACCORDANCE WITH SECTION 2512.1.2. OF THE MOST CURRENTCALIFORNIA BUILDING CODE, IF THE SUBJECT BUILDING SIDING TREATMENT IS STUCCO. CONTRACTORSHALL NOTIFY ENGINEER IF ANY GRADES ARE ADJUSTED. CONTRACTOR SHALL ALSO APPLY FLASHINGWHERE APPLICABLE WITHIN AREAS OF GRADE TRANSITION.11.ALL LANDSCAPE AREAS THAT ABUT ANY PORTION OF THE BUILDING SHALL BE GRADED SUCH THATTHE FINISHED GRADE IN LANDSCAPE AREAS SHALL BE A MINIMUM OF EIGHT INCHES (8") BELOWFINISHED FLOOR OF THE ABUTTING BUILDING AND IN NO CASE SHALL THE LANDSCAPE AREA BEGRADED OR LANDSCAPED SUCH THAT WATER DRAINS TOWARD THE BUILDING.12.SINCE THE ENGINEER CANNOT CONTROL THE EXACT METHOD OR MEANS USED BY THE CONTRACTORDURING GRADING OPERATIONS, NOR CAN THE ENGINEER GUARANTEE THE EXACT SOIL CONDITIONOVER THE ENTIRE SITE, THE ENGINEER ASSUMES NO RESPONSIBILITY FOR FINAL EARTHWORKQUANTITIES.13.CONTRACTOR IS RESPONSIBLE FOR THE OFF HAUL AND DISPOSAL OF ANY AND ALL EXCESS DIRTFROM CONSTRUCTION SITE.14.CONTRACTOR SHALL COORDINATE WITH THE EXISTING ADJOINING PROPERTY OWNERS PRIOR TO ANYWORK BEING STARTED THAT MAY AFFECT THEIR PROPERTY.15.CONTRACTOR SHALL PROVIDE A SMOOTH TRANSITION FROM THE PROPOSED GRADING TO THEEXISTING FLOWLINE, CURB, CONCRETE, AND OR PAVEMENT ELEVATIONS.16.ALL EXISTING WELLS AND SEPTIC TANKS SHALL BE REMOVED AND/OR ABANDONED PER THEREQUIREMENTS OF THE COUNTY HEALTH DEPARTMENT AND THE CITY OF MERCED. THIS WORK SHALLBE INCLUDED IN THE LUMP SUM CLEARING COST.17.CONTRACTOR SHALL VERIFY BUILDING SUBGRADE SECTIONS WITH ARCHITECT PLANS BEFORECONSTRUCTION. IF A DISCREPANCY EXISTS, CONTRACTOR TO NOTIFY THE ENGINEER IMMEDIATELY.18.PRIOR TO CONSTRUCTING ANY FLATWORK THE CONTRACTOR SHALL VERIFY THE FINISH FLOORELEVATIONS AT ALL DOORS. NOTE THAT FINISH FLOOR ELEVATIONS MAY HAVE BEEN CHANGED DUE TOFOUNDATION ADJUSTMENTS IN FIELD. CONTRACTOR SHALL HOLD ADJUSTED FINISH FLOOR GRADES,ACCOUNT FOR DOOR THRESHOLDS, AND ADJUST GRADES AS NECESSARY TO STAY IN COMPLIANCEWITH CURRENT ADA STANDARDS. CONTRACTOR SHALL NOTIFY NORTHSTAR ENGINEERINGIMMEDIATELY IF ANY GRADE ADJUSTMENTS WILL CREATE ADA ACCESSIBILITY ISSUES.

19.THE VALUES SHOWN ON THE GRADING PLAN ARE FOR REFERENCE AND FEE PURPOSES ONLY. SINCETHE ENGINEER CANNOT CONTROL THE EXACT METHOD OR MEANS USED BY THE CONTRACTOR DURINGGRADING OPERATIONS, NOR CAN THE ENGINEER GUARANTEE THE EXACT SOIL CONDITION OVER THEENTIRE SITE, THE ENGINEER ASSUMES NO RESPONSIBILITY FOR FINAL EARTHWORK QUANTITIES.20.THE VALUES SHOWN ON THE GRADING PLAN ARE TO AID THE CONTRACTOR IN DETERMINING THEQUANTITIES OF DIRT TO BE MOVED. THE CUT AND FILL QUANTITIES SHOWN INDICATE A THEORETICALYARDAGE FIGURE AND ARE GIVEN ONLY AS A CONVENIENCE TO THE CONTRACTOR. THE QUANTITIESSHOWN SHALL NOT BE USED AS THE BASIS OF BID COSTS.21.EARTHWORK QUANTITY VALUES SHOWN ON PAVING PLAN REPRESENT THE DIFFERENCE BETWEEN THEESTIMATED EXISTING GRADES FROM ASBUILT DOCUMENTS COMPARED WITH THE SUBGRADESTRUCTURAL SECTIONS OF THE PROPOSED GRADING DESIGN. SEE STRUCTURAL SECTIONS IN HATCHLEGEND ON PAVING PLAN.22.EARTHWORK QUANTITY CALCULATIONS DO NOT INCLUDE STRIPPING, SHRINKAGE, SWELL FACTORS ORMATERIAL FROM UTILITY TRENCH SPOILS.

1.STORM DRAIN NPDES PERMIT TO COMPLY WITH THE STATE OF CALIFORNIA'S STATEWIDE GENERALNPDES PERMIT, REGULATING DISCHARGES OF STORM WATER ASSOCIATED WITH CONSTRUCTIONACTIVITY FROM SOIL DISTURBANCES OF ONE (1) ACRE OR MORE, A NOTICE OF INTENT (NOI) TOCOMPLY WITH THE TERMS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITHCONSTRUCTION ACTIVITY MUST BE FILED AND THE APPROPRIATE FEE PAID PRIOR TOCOMMENCEMENT OF CONSTRUCTION. IN ADDITION, AT THE CONCLUSION OF THE PROJECT A NOTICEOF TERMINATION (NOT) MUST ALSO BE FILED. SUBMIT THE FEE, NOI, AND NOT TO THE STATE WATERRESOURCES CONTROL BOARD UTILIZING THE STORM WATER MULTIPLE APPLICATION AND REPORTTRACKING SYSTEM (SMARTS) AT THE FOLLOWING ADDRESS:WWW.SMARTS.WATERBOARDS.CA.GOVFEES AND PAYMENTS CAN BE MADE TO THE FOLLOWING ADDRESS:STATE WATER RESOURCES CONTROL BOARDDIVISION OF WATER QUALITYATTN:STORM WATER PERMIT UNITP.O.BOX 1977SACRAMENTO, CA 95812-1977IF YOU HAVE ANY QUESTIONS CALL JOSEPH HENAO, WATER QUALITY CONTROL ENGINEER, CALIFORNIAREGIONAL WATER QUALITY CONTROL BOARD, AT (916) 255-3028.THE FOLLOWING MUST BE SUBMITTED TO THE CITY PRIOR TO BEGINNING WORK AND PRIOR TO THEISSUANCE OF AN ENCROACHMENT PERMIT:A)TRANSMITTAL MEMO THAT INCLUDES:*THE NAME AND PHONE NUMBER OF THE PERSON RESPONSIBLE FOR SWPPP IMPLEMENTATION, AND*IF APPLICABLE, A LISTING OF THE POST-CONSTRUCTION BEST MANAGEMENT PRACTICES THAT WILLBE INSTALLED TO SATISFY THE REQUIREMENTS OF THE CITY OF MERCED MUNICIPAL CODE CHAPTERTITLES 13 AND 15.*COPY OF SWPPP MUST REMAIN ON SITE DURING CONSTRUCTION AT ALL TIMES.B)COPY OF A SIGNED NOTICE OF INTENT FORM OR A WASTE DISCHARGE IDENTIFICATION NUMBER.WDID#: CONTRACTOR TO PROVIDE PRIOR TO CONSTRUCTION; IF REQUIRED2.FOR SITES THAT HAVE SOIL DISTURBANCES OF 1 ACRE OR MORE AND ARE REQUIRED TO OBTAINCOVERAGE UNDER THE STATE'S CONSTRUCTION GENERAL PERMIT (CGP): THE CONTRACTOR SHALL COORDINATE WITH THE OWNER AND ENSURE THAT A QUALIFIED SWPPPPRACTITIONER (QSP) IS CONTRACTED TO PROVIDE QSP SERVICES THROUGHOUT THE COURSE OFCONSTRUCTION (FROM THE START OF CONSTRUCTION TO THE DATE AT WHICH THE NOTICE OFTERMINATION - NOT - IS FILED). THE QSP SHALL BE RESPONSIBLE FOR ALL APPLICABLE INSPECTIONS,TRAINING, SAMPLING, TESTING, REPORTING, CHANGES OF INFORMATION (COI), SWPPP REVISIONS,NOTICE OF TERMINATION (NOT), AND OTHER QSP-RELATED RESPONSIBILITIES AS IDENTIFIED IN THESTATE'S CGP.DEWATERING NOTES1.THE CONTRACTOR SHALL FURNISH, INSTALL, OPERATE AND MAINTAIN ALL MACHINERY APPLIANCES,AND EQUIPMENT TO MAINTAIN ALL EXCAVATIONS FREE FROM WATER DURING CONSTRUCTION. THECONTRACTOR SHALL DISPOSE OF THE WATER SO AS NOT TO CAUSE DAMAGE TO PUBLIC OR PRIVATEPROPERTY, OR TO CAUSE A NUISANCE OR MENACE TO THE PUBLIC OR VIOLATE THE LAW. THEDEWATERING SYSTEM SHALL BE INSTALLED AND OPERATED SO THAT THE GROUNDWATER LEVELOUTSIDE THE EXCAVATION IS NOT REDUCED TO THE EXTENT WHICH WOULD CAUSE DAMAGE ORENDANGERED ADJACENT STRUCTURES OR PROPERTY. ALL COST FOR DEWATERING SHALL BEINCLUDED IN THE UNIT PRICE BID FOR ALL PIPE CONSTRUCTION. THE STATIC WATER LEVEL SHALL BEDRAWN DOWN A MINIMUM OF 1 FOOT BELOW THE BOTTOM OF EXCAVATIONS TO MAINTAIN THEUNDISTURBED STATE OF NATURAL SOILS AND ALLOW THE PLACEMENT OF ANY FILL TO THE SPECIFIEDDENSITY. THE CONTRACTOR SHALL HAVE ON HAND, PUMPING EQUIPMENT AND MACHINERY IN GOODWORKING CONDITION FOR EMERGENCIES AND SHALL HAVE WORKMEN AVAILABLE FOR IT'SOPERATION. DEWATERING SYSTEMS SHALL OPERATE CONTINUOUSLY UNTIL BACK FILL HAS BEENCOMPLETED TO 1 FOOT ABOVE THE NORMAL STATIC GROUNDWATER LEVEL.2.THE CONTRACTOR SHALL CONTROL SURFACE WATER TO PREVENT ENTRY INTO EXCAVATIONS. AT EACHEXCAVATION, A SUFFICIENT NUMBER OF TEMPORARY OBSERVATION WELLS TO CONTINUOUSLY CHECKTHE GROUNDWATER LEVEL SHALL BE PROVIDED.3.THE CONTROL OF GROUNDWATER SHALL BE SUCH THAT SOFTENING OF THE BOTTOM OFEXCAVATIONS, OR FORMATION OF "QUICK" CONDITIONS OR "BOILS", DOES NOT OCCUR. DEWATERINGSYSTEMS SHALL BE DESIGNED AND OPERATED SO AS TO PREVENT REMOVAL OF THE NATURAL SOILS.THE RELEASE OF GROUNDWATER AT ITS STATIC LEVEL SHALL BE PERFORMED IN SUCH A MANNER ASTO MAINTAIN THE UNDISTURBED STATE OF THE NATURAL FOUNDATIONS SOILS, PREVENTDISTURBANCE OF COMPACTED BACK FILL, AND PREVENT FLOTATION OR MOVEMENT OF STRUCTURES,PIPELINES AND SEWERS. IF AN NPDES (NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM)PERMIT IS REQUIRED FOR DISPOSAL OF WATER FROM CONSTRUCTION DEWATERING ACTIVITIES, ITSHALL BE OBTAINED BY THE CONTRACTOR PRIOR TO ANY DEWATERING ACTIVITIES.4.ONE HUNDRED PERCENT STANDBY PUMPING CAPACITY SHALL BE AVAILABLE ON SITE AT ALL TIMESAND SHALL BE CONNECTED TO THE DEWATERING SYSTEM PIPING TO PERMIT IMMEDIATE USE. INADDITION, STANDBY AUXILIARY EQUIPMENT AND APPLIANCES FOR ALL ORDINARY EMERGENCIES, ANDCOMPETENT WORKMEN FOR OPERATION AND MAINTENANCE OF ALL DEWATERING EQUIPMENT SHALLBE ON SITE AT ALL TIMES. STANDBY EQUIPMENT SHALL INCLUDE EMERGENCY POWER GENERATIONAND AUTOMATIC SWITCH OVER TO THE EMERGENCY GENERATOR WHEN NORMAL POWER FAILS.DEWATERING SYSTEMS SHALL NOT BE SHUT DOWN BETWEEN SHIFTS, ON HOLIDAYS, ON WEEKENDS,OR DURING WORK STOPPAGES.5.SUMPS SHALL BE NO DEEPER THAN 5 FEET AND SHALL BE AT THE LOW POINT OF EXCAVATION.EXCAVATION SHALL BE GRADED TO DRAIN TO THE SUMPS.STORM DRAIN NOTES1.ALL STORM DRAIN CONSTRUCTION, MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITHTHE REQUIREMENTS OF THE LATEST EDITION OF THE CALIFORNIA PLUMBING CODE.2.THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAGMEN OR OTHER DEVICESNECESSARY FOR PUBLIC SAFETY.3.THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING OR OTHER PROVISIONSNECESSARY TO PROTECT WORKMEN FOR ALL AREAS TO BE EXCAVATED TO A DEPTH OF 5 FEET ORMORE. SAID PROTECTION TO BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE CITY OFMERCED DEPARTMENT OF PUBLIC WORKS, AND STATE REGULATIONS.4.ALL MAINTENANCE HOLE RIMS TO BE ADJUSTED TO PROPOSED FINISH GRADE AFTER STREET PAVING,UNLESS OTHERWISE NOTED. COST FOR RAISING FACILITIES TO BE INCLUDED IN UNIT PRICES FORMAINTENANCE HOLES.5.ALL STORM DRAIN LINES SHALL BE CLEANED OF ALL SAND AND DEBRIS PRIOR TO ACCEPTANCE BYTHE CITY OF MERCED.6.THE CONTRACTOR SHALL EXPOSE ALL EXISTING STORM DRAIN PIPES, WHERE A CONNECTION IS TO BEMADE, AND NOTIFY THE ENGINEER IF THERE IS A DISCREPANCY BETWEEN THE SIGNED PLANS AND THEEXISTING FIELD CONDITION PRIOR TO THE START OF CONSTRUCTION.7.STORM DRAIN CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING UNDERGROUND UTILITIES ANDWILL BE RESPONSIBLE FOR PROTECTION OF THE SAME.8.CONTRACTOR TO BE RESPONSIBLE FOR ALL TESTING OF STORM DRAIN FACILITIES IN ACCORDANCEWITH THE CITY OF MERCED STANDARD SPECIFICATIONS AND PLANS.9.STORM DRAINAGE SYSTEM WILL BE PUBLICLY OWNED AND MAINTAINED.

1.SEE ARCHITECTURAL PLANS FOR ALL BUILDING DETAILS, STRUCTURAL DETAILS, FOOTING DETAILS,UTILITY POINTS OF CONNECTION, ROOF DRAIN LOCATIONS, ADA PATH OF TRAVEL, ADA SIGNAGE, ADAACCESSIBILITY DETAILS, TRUNCATED DOME LOCATIONS, ENTRY MONUMENTS, GENERAL SIGNAGE,PARKING LOT STRIPING AND SITE PLAN CONSTRAINTS.2.SEE PLUMBING PLANS FOR CONTINUATION OF UTILITIES WITHIN 5 FEET OF THE BUILDING.3.SEE LANDSCAPE PLANS FOR ALL LANDSCAPE IMPROVEMENTS INCLUDING LANDSCAPE IRRIGATION,LANDSCAPE AREA GRADING, LANDSCAPE SLEEVE CROSSINGS AND LANDSCAPE SLOPE TREATMENT.ANY AND ALL LANDSCAPE REMOVAL OR RELOCATION.4.SEE ELECTRICAL PLANS FOR DRY UTILITY LAYOUT, DRY UTILITY DETAILS AND SPECIFICATIONS,MODIFICATIONS TO EXISTING DRY UTILITIES, SITE LIGHTING LOCATIONS AND DETAILS, POINTS OFCONNECTION, AND SLEEVE CROSSINGS. ANY AND ALL ELECTRICAL REMOVAL OR RELOCATION.5.GEOTECHNICAL REPORTS OR ADDENDUMS MAY EXIST IN WHICH CASE THE CONTRACTOR SHALLCONTACT THE CLIENT PRIOR TO CONSTRUCTION TO ENSURE THAT ALL REPORTS AND ADDENDUMSHAVE BEEN PROVIDED. CONTRACTOR SHALL REVIEW ALL REPORTS AND ADDENDUMS THEN NOTIFYNORTHSTAR ENGINEERING SHOULD A CONFLICT IS FOUND OR DESIGN SHOWN ON THESE PLANS DOESNOT MEET THE GEOTECHNICAL ENGINEERS RECOMMENDATIONS.6.STRIPING SHALL BE APPLIED PER CITY STANDARDS AS SHOWN ON THIS PLAN SET. ADDITIONALLYSTRIPING AND SIGNAGE INFORMATION SHALL FOLLOW MANUAL OF UNIFORM TRAFFIC CONTROLDEVICES (MUTCD) LATEST EDITION, MUTCD CALIFORNIA SUPPLEMENTS.7.FLATWORK SHALL BE INSTALLED WITH CRACK CONTROL JOINTS AT APPROPRIATE SPACING.8.CONSTRUCT CONTROL AND CONSTRUCTION JOINTS IN ACCORDANCE WITH CURRENT PORTLANDCEMENT ASSOCIATION GUIDELINES AND CITY STANDARDS; USE WHICH EVER IS MORE STRINGENT. SEEGEOTECHNICAL REPORT FOR ADDITIONAL PCC RECOMMENDATIONS.9.ANY UNSUITABLE MATERIAL ENCOUNTERED AT OR BELOW GRADE SHALL BE COMPLETELY REMOVEDTO THE FULL DEPTH AND REPLACED WITH COMPACTED ENGINEERED FILL OR APPROVED IMPORTSOILS.10.GEOTECHNICAL ENGINEER SHALL VERIFY MOISTURE CONTENT AND CONDITIONING PRIOR TO POURINGANY CONCRETE OR ASPHALT.11.PRIOR TO CONSTRUCTION CONTRACTOR SHALL REVIEW EXISTING GRADES ALONG SAWCUT LINE ANDTRANSITIONS TO MATCH EXISTING IMPROVEMENTS TO ENSURE BOTH DRAINAGE FLOW IS CONTINUOUSAND UNINTERRUPTED AND ACCESSIBILITY REQUIREMENTS ARE BEING MET.12.CONTRACTOR SHALL ADJUST ANY AND ALL BOXES, STRUCTURES, ETC. TO FINISH GRADE WITHTRAFFIC RATED LID FOR VEHICULAR AREAS AND ACCESSIBLE LID FOR PEDESTRIAN AREAS BASED ONPROPOSED GRADING DESIGN SHOWN IN THIS PLAN SET. SEE ARCHITECTURAL PLANS, SEE LANDSCAPEARCHITECT PLANS.13.CONTRACTOR SHALL MAINTAIN EROSION RESISTANT VEGETATION ON FACE OF ALL SLOPES.14.ALL PROPOSED A.C. PAVING SHALL BE FOG SEALED PER SECTION 37 OF CALTRANS STANDARD &SPECIFICATIONS, THE LATEST EDITION. FOG SEALING SHALL BE APPLIED AT LEAST NINE MONTHSAFTER THE PAVING IS INSTALLED, BUT NO LATER THAN EIGHTEEN MONTHS AFTER PAVING ISINSTALLED. CONTRACTOR SHALL RESTRIPE PAVEMENT AS NECESSARY. RESTRIPING SHALL CONFORMTO THE PROJECT PLANS AND SPECIFICATIONS.

STORM DRAIN NOTES (CONT)10.ALL STORM DRAIN PIPE MATERIALS SHALL BE IN ACCORDANCE WITH TABLE 701.2 OF THE 2022CALIFORNIA PLUMBING CODE. CONTRACTOR SHALL HAVE PIPE MANUFACTURER PERFORMCALCULATIONS TO DETERMINE PIPE CLASS PRIOR TO CONSTRUCTION DUE TO EXCESSIVE DEPTH.11.ALL STORM DRAIN MAINTENANCE HOLES AND BASES SHALL BE PRECAST AND CONSTRUCTED INACCORDANCE WITH CITY OF MERCED STANDARDS, CONTRACTOR SHALL SET MAINTENANCE HOLECASTING AND COVERS TO FINISH GRADE AFTER STREET IMPROVEMENTS ARE COMPLETE, AND SHALLBE RESPONSIBLE FOR LOCATION OF MAINTENANCE HOLES BENEATH THE FINISH PAVEMENT.TOPOGRAPHY NOTES1.PLAN SET DESIGN BASED OFF OF TOPOGRAPHIC SURVEY PERFORMED ON AUGUST 13, 2023.CONTRACTOR SHALL BE AWARE THAT SINCE THIS INITIAL SURVEY THE SITE MAY HAVE CHANGED.2.ALL EXISTING UTILITIES WERE PLOTTED FROM RECORD INFORMATION AND FIELD TOPOGRAPHY.ACTUAL LOCATIONS MAY VARY AND ADDITIONAL CROSSINGS MAY EXIST IN THE FIELD.3.THE CONTRACTOR SHALL USE EXTREME CAUTION WHEN EXPOSING EXISTING UTILITY CROSSINGS ANDSERVICES.4.ANY DAMAGE TO EXISTING UTILITIES WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.5.PRIOR TO BEGINNING CONSTRUCTION THE CONTRACTOR SHALL CALL U.S.A. (800) 227-2600 TO HAVETHE SITE MARKED. THE CONTRACTOR SHALL POTHOLE ALL EXISTING UTILITIES TO VERIFY THAT NOCONFLICTS EXIST BETWEEN PROPOSED AND EXISTING IMPROVEMENTS.6.CONTRACTOR/DEVELOPER SHALL OBTAIN AN ENCROACHMENT PERMIT FROM THE APPROPRIATEAGENCY TO DO ANY WORK WITHIN RIGHT-OF-WAY PRIOR TO CONSTRUCTION.7.CONTRACTOR TO BE CAUTIOUS OF UNDERGROUND STUBS AND LINES. CONTRACTOR SHALL USEEXTREME CAUTION AS TO OTHER LINES MAY EXIST ON THE SITE THAT ARE NOT CLEARLY MARKED.8.AN ATTEMPT HAS BEEN MADE TO SHOW ALL EXISTING STRUCTURES, UTILITIES, DRIVES, PAVEMENTS,CURBS, WALKS, ETC. IN THEIR APPROXIMATE LOCATION ON THE SURVEY AND/OR WORKINGDRAWINGS. HOWEVER, OTHERS THAT ARE NOT SHOWN MAY EXIST AND MAY BE FOUND UPON VISITINGTHE SITE OR DURING THE CLEARING AND REMOVAL WORK. IT WILL BE THE RESPONSIBILITY OF THISCONTRACTOR TO ACCURATELY LOCATE ALL EXISTING FACILITIES AND TO DETERMINE THEIR EXTENT. IFSUCH FACILITIES OBSTRUCT THE PROGRESS OF THE WORK AND ARE NOT INDICATED TO BE REMOVEDOR RELOCATED, THEY SHALL BE REMOVED OR RELOCATED ONLY AS DIRECTED BY THE OWNER.9.THE CONTRACTOR SHALL REPORT ANY EXISTING SITE ELEMENT NOT SHOWN ON THE WORKINGDRAWINGS TO THE ARCHITECT OF RECORD SO THAT THE PROPER DISPENSATION OF THAT ELEMENTMAY BE MADE.10.IN CONJUNCTION WITH CONTACTING USA TO LOCATE UNDERGROUND UTILITIES WITHIN THE PUBLICRIGHT-OF-WAY IT IS HIGHLY RECOMMENDED THAT THE CONTRACTOR UTILIZE (GPR) GROUNDPENETRATING RADAR UNDERGROUND SERVICES TO IDENTIFY ONSITE UTILITIES THAT MAY NOT BEVISIBLE FROM THE SURFACE.11.CONTRACTOR SHALL REVIEW ALL OF THE CONSULTANT'S PLAN SETS FOR ADDITIONAL DEMOLITION,REPLACEMENT AND IMPROVEMENTS PRIOR TO BEGINNING OF ANY WORK. IF A CONFLICT IS FOUNDTHEN THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND ENGINEER IMMEDIATELY.12.IN ACCORDANCE WITH SECTION 8771 OF THE PROFESSIONAL LAND SURVEYORS ACTA)MONUMENTS SET SHALL BE SUFFICIENT IN NUMBER AND DURABILITY AND EFFICIENTLY PLACEDSO AS NOT TO BE READILY DISTURBED, TO ASSURE, TOGETHER WITH MONUMENTS ALREADYEXISTING, THE PERPETUATION OR FACILE REESTABLISHMENT OF ANY POINT OR LINE OF THESURVEY.B)WHEN MONUMENTS EXIST THAT CONTROL THE LOCATION OF SUBDIVISIONS, TRACTS,BOUNDARIES, ROADS, STREETS, OR HIGHWAYS, OR PROVIDE HORIZONTAL OR VERTICAL SURVEYCONTROL, THE MONUMENTS SHALL BE LOCATED AND REFERENCED BY OR UNDER THE DIRECTIONOF A LICENSED LAND SURVEYOR OR REGISTERED CIVIL ENGINEER PRIOR TO THE TIME WHEN ANYSTREETS, HIGHWAYS, OTHER RIGHTS-OF-WAY, OR EASEMENTS ARE IMPROVED, CONSTRUCTED,RECONSTRUCTED, MAINTAINED, RESURFACED, OR RELOCATED, AND A CORNER RECORD ORRECORD OF SURVEY OF THE REFERENCES SHALL BE FILED WITH THE COUNTY SURVEYOR. THEYSHALL BE RESET IN THE SURFACE OF THE NEW CONSTRUCTION, A SUITABLE MONUMENT BOXPLACED THEREON, OR PERMANENT WITNESS MONUMENTS SET TO PERPETUATE THEIR LOCATIONIF ANY MONUMENT COULD BE DESTROYED, DAMAGED, COVERED, OR OTHERWISE OBLITERATED,AND A CORNER RECORD OR RECORD OF SURVEY FILED WITH THE COUNTY SURVEYOR PRIOR TOTHE RECORDING OF A CERTIFICATE OF COMPLETION FOR THE PROJECT. SUFFICIENT CONTROLLINGMONUMENTS SHALL BE RETAINED OR REPLACED IN THEIR ORIGINAL POSITIONS TO ENABLEPROPERTY, RIGHT-OF-WAY AND EASEMENT LINES, PROPERTY CORNERS, AND SUBDIVISION ANDTRACT BOUNDARIES TO BE REESTABLISHED WITHOUT PREVIOUS SURVEYS NECESSARILYORIGINATING ON MONUMENTS DIFFERING FROM THOSE THAT CURRENTLY CONTROL THE AREA. ITSHALL BE THE RESPONSIBILITY OF THE GOVERNMENTAL AGENCY OR OTHERS PERFORMINGCONSTRUCTION WORK TO PROVIDE FOR THE MONUMENTATION REQUIRED BY THIS SECTION. ITSHALL BE THE DUTY OF EVERY LAND SURVEYOR OR CIVIL ENGINEER TO COOPERATE WITH THEGOVERNMENTAL AGENCY IN MATTERS OF MAPS, FIELD NOTES, AND OTHER PERTINENT RECORDS.MONUMENTS SET TO MARK THE LIMITING LINES OF HIGHWAYS, ROADS, STREETS ORRIGHT-OF-WAY OR EASEMENT LINES SHALL NOT BE DEEMED ADEQUATE FOR THIS PURPOSEUNLESS SPECIFICALLY NOTED ON THE CORNER RECORD OR RECORD OF SURVEY OF THEIMPROVEMENT WORKS WITH DIRECT TIES IN BEARING OR AZIMUTH AND DISTANCE BETWEENTHESE AND OTHER MONUMENTS OF RECORD.C)CONTRACTOR SHALL COORDINATE WITH THE LAND SURVEYOR OF RECORD, PRIOR TO STARTINGCONSTRUCTION, TO IDENTIFY ALL SURVEY MONUMENTS THAT MAY BE SUBJECT TO DISTURBANCEAND SHALL INCLUDE COSTS FOR MONUMENT PRESERVATION, REPLACEMENT, AND PREPARATIONOF CORNER RECORDS OR RECORD OF SURVEY IN CONTRACTOR'S BID.D)THE DECISION TO FILE EITHER THE REQUIRED CORNER RECORD OR A RECORD OF SURVEYPURSUANT TO SUBDIVISION (B) SHALL BE AT THE ELECTION OF THE LICENSED LAND SURVEYOR ORREGISTERED CIVIL ENGINEER SUBMITTING THE DOCUMENT, AT CONTRACTOR'S EXPENSE.§732.5, §1492.5, §1810.5 OF THE CALIFORNIA STREETS AND HIGHWAYS CODES STATE:SURVEY MONUMENTS SHALL BE PRESERVED, REFERENCED, OR REPLACED PURSUANT TO SECTION8771 OF THE BUSINESS AND PROFESSIONS CODE.

APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 07/01/2025 08:32 PLOTTED BY: CvanderveenDWGNAME: \\Nserver\northstar-data\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C1.3 NTS.dwg C1.3COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC server\CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION
±2.0%
C/L17.5'
65' RIGHT-OF-WAY LOCAL STREET SECTIONANTS
65' RIGHT OF WAY21.5'5' 30' 35'
C/L18'
64' RIGHT-OF-WAY LOCAL STREET SECTIONBNTS
64' RIGHT OF WAY18'8'0.5'32' 32'5' 8'0.5'5'EX. F/C F/C

4.5'
EX. R/W EX. R/W

7.5'5'F/CEX. F/C0.5' SC
±2.0%CONTRACTOR TO WORK WITH ADJACENTPROPERTY OWNER TO CONSTRUCTSMOOTH TRANSITION TO EXISTING

CONTRACTOR TO WORK WITH ADJACENTPROPERTY OWNER TO CONSTRUCTSMOOTH TRANSITION TO EXISTING CITY OF MERCED STANDARD DETAILS1.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN THE MOST UP TO DATE CITY STANDARDS FORREFERENCE PRIOR TO AND DURING CONSTRUCTION.2.THE LATEST COPY OF THE CITY OF MERCED STANDARDS SHALL BE CONSIDERED PART OF THIS PLAN SET.3.IN THE EVENT OF A DISCREPANCY BETWEEN THIS PLAN SET AND CITY STANDARDS; THE CITY STANDARDS SHALLPREVAIL.

DETAILS AND CROSS SECTIONS

AS SHOWN APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 07/01/2025 08:47 PLOTTED BY: CvanderveenDWGNAME: \\Nserver\northstar-data\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C1.4 DTLS.dwg C1.4COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC server\CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION

SAWCUT LINE

1.5" MIN4' 4'
LAP JOINT DETAIL1
SEE DIMENSION AND PAVINGSHEETS FOR PAVEMENT SECTIONSPROPOSED NEW ASPHALT CONCRETE,PLACE OVER EXISTING AC AS SHOWN.

PAVEMENT REINFORCING FABRIC PERSECTION 88 OF THAT STATE STANDARDSPECIFICATIONS. APPLY TACK COAT ONPAVING PRIOR TO PLACING FABRIC.*SUBGRADE PREPARATION REQUIREMENTS PERGEOTECHNICAL REPORT.MATCH EXISTINGPAVEMENT SECTION GRIND OUT 1.5" MIN. OFEXISTING PAVEMENT.

NTS
*NOTE:1.*SUBGRADE PREPARATION REQUIREMENTS PER GEOTECHNICAL REPORT, CITY OF MERCED STANDARDSAND SPECIFICATIONS, AND PROJECT SPECIFICATIONS.2.LAP JOINT SHALL APPLY AT ALL SAWCUT LOCATIONS ALONG ALL PAVEMENT UNLESS OTHERWISE NOTED.

FINISH GRADE 0.10'BELOW FLATWORKDRILL EXISTING SIDEWALK

COMPACTED AB CLASS II
SEE CONC/AC PAVING TRANSITIONFOR THICKENED CONCRETE EDGESEE EXPANSION JOINT DETAIL FOR SEALANTAND ADDITIONAL INFORMATIONFLUSH24" SMOOTH DOWEL *SCARIFICATION AND RE-COMPACTION
CONCRETE FLATWORK AT EXISTING FLATWORKNTS2
*NOTE:1.*SUBGRADE PREPARATION REQUIREMENTS PER GEOTECHNICAL REPORT.2.AT EXPANSION JOINT USE 1/2 "x24" SMOOTH DOWELS, 18" OC GREASE 1/2 THE LENGTH BEFORECONCRETE PLACEMENT. SEE EXPANSION JOINT DETAIL THIS SHEET.3.CONSTRUCT CONTROL AND CONSTRUCTION JOINTS IN ACCORDANCE WITH CURRENTPORTLAND CEMENT ASSOCIATION GUIDELINES.4.SEE STRUCTURAL SECTIONS ON DIMENSIONS AND PAVING PLANS: SHEET C3.1 3NTS
1/2"x24" SMOOTH DOWEL, DOWELS SHALL BE SET LEVELALIGN DOWELS WITH CONCRETE REINFORCEMENT, GREASE1/2 THE LENGTH BEFORE CONCRETE PLACEMENTFLUSH FLUSH TRANSITIONBACKER RODSILICONE SEALANT DOW CORNING890SL OR APPROVED EQUAL 1/2" MAX. THICK EXPANSION JOINT EXPANSION JOINT
NOTE:SEE CITY OF MERCEDSTANDARDS AND SPECIFICATIONSFOR ADDITIONAL INFORMATION.

STREET SECTION TABLESTREET NAMETYP. CROSS-SECTIONSTRUCTURAL SECTION(A.C. / A.B.)**SUBGRADE SECTIONTRAFFIC INDEX(T.I.)RESISTANCE VALUE("R") *SIDEWALKW. CHILDS AVEA 2.5" / 6.0"***12" (95% R.C.)6 * 4" PCC / 4"ABS. CANAL STB 2.5" / 8.5"***12" (95% R.C.)6 * 4" PCC / 4"AB*R-VALUE TESTS SHALL BE PERFORMED BY GEOTECHNICAL ENGINEER ONCE PAVEMENT SUBGRADE IS ESTABLISHED TO CONFIRM THE PAVEMENT SECTION DESIGN.**USE STRUCTURAL SECTION LISTED OR MATCH EXISTING, WHICH EVER IS GREATER. GEOTECHNICAL ENGINEER TO VERIFY STRUCTURAL SECTION PRIOR TO CONSTRUCTION.*** STRUCTURAL SECTION VALUES TAKEN FROM "PLEASANTON PARK IMPROVEMENT PLANS" RECORD DRAWING DATED 5/11/1981 AND "IMPROVEMENT PLANS FOR CYPRESSTERRACE PH 3 & 4" RECORD DRAWING DATED DECEMBER 2003 TSB
TSB
TSBJP
TSB

PPJPTSB
TSB
TSB

JPJPJPJPJPJPJPJP
JP
JP
JP
JP
JP
JP
TSB
TEL

TELELCELC
TEL
ELV

PAC SLB ELB
ELB
UTIL
ELB

BIKELANE

BIKELANE

SIGNALAHEADBIKELANESTOP STOP
CIVIL IMPROVEMENTSSEE SHEETS: C2.1 - TOPOGRAPHIC AND DEMOLITION C3.1 - PAVING AND DIMENSIONING C5.1 - COMPOSITE UTILITY

OVERALL SITE PLAN

AS SHOWN
01" = 80408080'

APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 06/30/2025 16:52 PLOTTED BY: TtophamDWGNAME: F:\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C1.5 KEY.dwg C1.5COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC 23-3406CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION
KEY NOTESSAWCUT AND REMOVE EXISTING PAVEMENT, CONCRETE, AND OR CURB AS REQUIRED PER THESEPLANS. CONTRACTOR MAY NEED TO FIELD ADJUST SAWCUT LINE TO REMOVE THE PAVEMENT ORCONCRETE SECTION AT A CLEAN EDGE OR NEAREST JOINT BASED ON FIELD CONDITIONS WHILEMAINTAINING ACCESSIBLE TRANSITION TO PROVIDE COMPLIANCE WITH ACCESSIBILITYSTANDARDS, WHERE APPLICABLE. LAP JOINT PER DETAIL 1 ON SHEET C1.4 SHALL APPLY TO ALLSAWCUT LOCATIONS ALONG AC PAVEMENT, UNLESS OTHERWISE NOTED.CONTRACTOR SHALL *USE EXTREME CAUTION* THROUGHOUT THE COURSE OF CONSTRUCTION ASADDITIONAL UNDERGROUND LINES AND STRUCTURES NOT SHOWN ON THIS PLAN MAY EXIST AND ARENOT CLEARLY MARKED OR VISIBLE FROM THE SURFACE. ADDITIONALLY CONTRACTOR SHALL USEEXTREME CAUTION WHILE WORKING BY LOW HANGING POWER LINES. IN CONJUNCTION WITHCONTACTING USA TO LOCATE UNDERGROUND UTILITIES WITHIN THE PUBLIC RIGHT-OF-WAY IT ISHIGHLY RECOMMENDED THAT THE CONTRACTOR UTILIZE (GPR) GROUND PENETRATING RADARUNDERGROUND SERVICES TO IDENTIFY UTILITIES THAT MAY NOT BE VISIBLE FROM THE SURFACE.*USE EXTREME CAUTION* CONTRACTOR SHALL PROTECT EXISTING STRUCTURES, OVERHEAD LINESAND UNDERGROUND UTILITIES THROUGHOUT THE COURSE OF CONSTRUCTION AND REPAIR/REPLACE IFDAMAGED DURING CONSTRUCTION, AT CONTRACTOR'S EXPENSE. COORDINATE WITH APPROPRIATECONSULTANT AND/OR AGENCY FOR ANY RELOCATION OR REMOVAL. CONTRACTOR SHALL ADJUST TOPROPOSED GRADE AS NECESSARY.CONTRACTOR SHALL PROTECT EXISTING CONCRETE, CURB AND/OR PAVEMENT THROUGHOUT THECOURSE OF CONSTRUCTION AND REPAIR/REPLACE IF DAMAGED DURING CONSTRUCTION, ATCONTRACTOR'S EXPENSE. SEE KEYNOTE "A" ABOVE.CONTRACTOR SHALL PROTECT EXISTING STRIPING AND SIGNAGE THROUGHOUT THE COURSE OFCONSTRUCTION AND REPAIR/REPLACE IF DAMAGED DURING CONSTRUCTION, AT CONTRACTOR'SEXPENSE.CONTRACTOR SHALL PROTECT EXISTING TREE, SHRUB, AND ROOTS THROUGHOUT THE COURSE OFCONSTRUCTION. EXCAVATION AND GRADING SHOULD BE KEPT TO A MINIMUM AND NOTIFY THEOWNER IMMEDIATELY SHOULD THE TREE NEED TO BE REMOVED TO COMPLETE IMPROVEMENTS.CONTRACTOR SHALL PROTECT EXISTING BUILDING THROUGHOUT THE COURSE OF CONSTRUCTION ANDREPAIR/REPLACE IF DAMAGED DURING CONSTRUCTION, AT CONTRACTOR'S EXPENSE.CONTRACTOR SHALL PROTECT EXISTING FENCE, GATE AND/OR MOWSTRIP THROUGHOUT THE COURSEOF CONSTRUCTION AND REPAIR/REPLACE IF DAMAGED DURING CONSTRUCTION, AT CONTRACTOR'SEXPENSE.CONTRACTOR SHALL *USE EXTREME CAUTION* WHEN PERFORMING CONSTRUCTION ACTIVITIES NEAREXISTING GAS LINE STRUCTURES AND/OR UNDERGROUND UTILITIES. SEE KEYNOTE "C" FOR ADDITIONALINFORMATION.CONTRACTOR SHALL REMOVE EXISTING CONCRETE, CURB, AND/OR PAVEMENT AS SHOWN ANDDISPOSE OF OFF-SITE AT THE CONTRACTOR'S EXPENSE. SEE KEYNOTE "A" ABOVE FOR ADDITIONALINFORMATION.CONTRACTOR SHALL RELOCATE EXISTING SIGN. CONTRACTOR SHALL COORDINATE WITH PROPERTYOWNER FOR ANY SALVAGING OF MATERIALS; OTHERWISE, CONTRACTOR SHALL DISPOSE OF OFFSITE ATTHE CONTRACTOR'S EXPENSE.CONTRACTOR SHALL RELOCATE EXISTING UTILITY POLE.CONTRACTOR SHALL REMOVE EXISTING TREE AND DISPOSE OF OFFSITE AT THE CONTRACTOR'SEXPENSE.CONTRACTOR SHALL REMOVE EXISTING FENCE UP TO RIGHT OF WAY AND DISPOSE OF OFFSITE AT THECONTRACTOR'S EXPENSE.CONTRACTOR SHALL RELOCATE EXISTING ELECTRICAL MANHOLE.CONTRACTOR SHALL RELOCATE EXISTING WATER STRUCTURE. CONTRACTOR SHALL COORDINATE WITHPROPERTY OWNER FOR NEW LOCATION OF STRUCTURE.

A
C
DEFG
B
HJKL

LEGENDEXISTING CONCRETEEXISTING CONCRETETO BE REMOVED

EXISTING PAVEMENTEXISTING PAVEMENTTO BE REMOVED
MNPRS
TSB
TSBJP

JPJPJPJPJPJPJPJPJP
JP
TSB
TEL
GVGV
EX-IRR-BX(15046)±163.00RIM±152.34BOTEX-IRRMH(15039)±161.69RIM±152.94FL(36")E±152.79FL(36")WEX-IRRMH(13523)±163.46RIM±157.16FL(24")E±152.81FL(36")W UTIL
WMBFP

WMBFPWMWM
WV

WV WV WVWVWV
APN: 059-024-081

BIKELANE

BIKELANE

SIGNALAHEADBIKELANESTOP STOP
EXISTING SIGN "STOP"EXISTING SIGN "NO PARKING"EXISTING SIGN "NO PARKING"EXISTING SIGN "BIKE LANE"EX-SSMH(14480)±161.20RIM±154.33FL(12")W±153.52FL(24")NE±153.47FL(24")S EX-SSMH(14481)±161.24RIM±154.31FL(12")E±154.04FL(30")NE±153.97FL(24")W EX-SSMH(14484)±162.43RIM±154.90FL(12")W±154.78FL(12")E,W EX-SSMH(14485)±163.79RIM±155.15FL(12")W±155.11FL(12")N Ex24"SS
Ex12"SS Ex12"SS
EX-SDCB(14482)±160.81RIM±154.49 BOTEX-SDCB(14483)±161.02RIM±157.47FL(18")W EX-SDCB(12700)±163.06RIM±160.67FL(24")NNO STRUCTURE NORTH

W CHILDS AVEB B B B
(TYP)C (TYP)C (TYP)C

C C CD D D
D
E E E
(TYP)H
(TYP)HH HH H
(TYP)J (TYP)J JJ
KL LL

CANAL ST
A
K
AAA

N EXISTING RIGHT-OF-WAY

EXISTING RIGHT-OF-WAYK KSS L LS
JP

JPJPJPJPJPJPJP

PP JP JP

TELELCELC
TEL

PAC SLB ELB ELB
GV

GV MAIL
ELB WM
WM
WM
WM
WM
WM

WMWV WVWV
WV

WV WV WV
WV

WVWVWV BIKELANE
STOP
EX-SDCB(14482)±160.81RIM±154.49 BOT
EX-IRRMH(15040)±161.21RIM±154.24FL(36")W
EX-IRR-BX(15046)±163.00RIM±152.34BOT
EX-SSMH(12269)±161.07RIM±154.12FL(12")W±153.33FL(24")S±153.29FL(24")N EX-SSMH(14480)±161.20RIM±154.33FL(12")W±153.52FL(24")NE±153.47FL(24")S EX-SSMH(12266)±160.99RIM±153.86FL(8")W±153.09FL(24")N±153.05FL(24")S 12"TREE
24"TREEEX-SSMH(12002)±160.97RIM±152.83FL(8")W±152.63FL(24")N±152.53FL(24")S 24"TREE24"TREE
15"TREE
20"TREE24"TREE18"TREE
20"TREE
APN: 059-024-081
Ex24"SS Ex24"SSS CANAL ST30"TREE

EXISTINGBUILDINGEXISTINGBUILDING
EX-SBC MH(12806)±160.97RIM

B B B(TYP)C (TYP)C (TYP)CCC C
C
(TYP)D
(TYP)D
(TYP)D(TYP)D E
E
(TYP)F
(TYP)F(TYP)F (TYP)F
GGG J
(TYP)J

JCANAL ST

STRATFORD CTSEVILLE WAYCARTMELL DR
M M M Ex24"SS

EXISTING RIGHT-OF-WAY

EXISTING RIGHT-OF-WAY
N
A
HHH
P PP
K A
KD D
D
AA A

NEXISTING RIGHT-OF-WAY
R
E

JPJPJPJP

PP JP JPTELELV

PAC SLB ELB

GVGV GV MAIL

ELBWMWMWMWMWM
WMWMWM
WM
WM WM
WM
WM
WM
WM
WM

WMWVWVWV WVWVWV WV WVWV
WV
WVWVWV 12"TREE
24"TREEEX-SSMH(12002)±160.97RIM±152.83FL(8")W±152.63FL(24")N±152.53FL(24")S 24"TREE24"TREE8"TREE
15"TREE24"TREE15"TREE
APN: 059-024-081
Ex24"SSEx24"SS 30"TREE

EXISTINGBUILDINGEXISTINGBUILDING

B (TYP)C (TYP)C CC
(TYP)D(TYP)D

DEXISTINGBUILDING(TYP)F
(TYP)F(TYP)F
GGG J

SEVILLE WAYCARTMELL DR
M M M

EXISTING RIGHT-OF-WAYHHH
P PP
DA

NEXISTING RIGHT-OF-WAY
A
EX-SDCB(16118)±158.41FL±147.98FL(18")W
EX-SDMH(16117)±159.77RIM±148.88FL(18")E±148.87FL(18")SEX-SDMH(14510)±159.19RIM±150.19FL(12")NE±147.86FL(18")S±147.62FL(18")N EX-SDCB(14513)±157.99FL±152.42FL(12")N
EX-SDCB(14512)±158.40FL±151.64FL(12")SW
EX-SSMH(16108)±159.57RIM±152.12FL(24")N,S
EX-SSMH(14511)±159.17RIM±153.09FL(8")E±151.82FL(24")N,S (TYP)D(TYP)D B (TYP)C (TYP)CEx18"SD

TOPOGRAPHIC AND DEMOLITION PLAN

AS SHOWN APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 06/30/2025 17:13 PLOTTED BY: TtophamDWGNAME: F:\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C2.1 TOPO.dwg C2.1COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC 23-3406CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION
01" = 40204040'
01" = 40204040'

SEE ABOVE RIGHT

SEE BELOW LEFT

SEE ABOVE RIGHT

SEE BELOW LEFT
01" = 40204040'
LEGENDEXISTING CONCRETEPROPOSED ASPHALT(SEE NOTE 3)
EXISTING PAVEMENTPROPOSED CONCRETE(SEE NOTE 3)SITE PLAN GENERAL NOTES1.ALL DIMENSIONS AS SHOWN ON THIS PLAN ARE TAKEN FROM EITHER THE CENTERLINE, CENTERLINEMONUMENT, FACE OF CURB, EDGE OF SIDEWALK, CENTERLINE OF STRIPING, AND OR PROPOSED/EXISTING RIGHT-OF-WAY. REFER TO CROSS-SECTIONS OF SHEET C1.4.2.CONTRACTOR TO REFER TO PROJECT FINAL MAP FOR LOCATING, ORIENTATION, AND ALIGNMENT OFPROPOSED CENTERLINES, LOT LINES, RIGHT-OF-WAYS, AND EASEMENTS, IF THERE IS A DISCREPANCYBETWEEN THESE PLANS AND THE PROJECT FINAL MAP, CONTRACTOR TO NOTIFY THE ENGINEERIMMEDIATELY.3.CONTRACTOR SHALL CONSTRUCT PAVEMENT, CURB, GUTTER, AND SIDEWALK SECTIONS AS SHOWNON THESE PLANS. PAVEMENT SECTION TO BE IN ACCORDANCE WITH STREET SECTION TABLE ONSHEET C1.4 AND PER CITY OF MERCED STANDARDS AND SPECIFICATIONS.4.CONTRACTOR SHALL CONSTRUCT 6" VERTICAL CURB, GUTTER, AND SIDEWALK IN ACCORDANCE WITHCITY OF MERCED STANDARD DETAIL SCG-1 AND IN ACCORDANCE WITH CITY STANDARDSPECIFICATIONS.5.CONTRACTOR SHALL CONSTRUCT ADA ACCESSIBLE CURB RAMPS IN ACCORDANCE WITH CITY OFMERCED STANDARD DETAIL SCG-2 AND IN ACCORDANCE WITH CITY STANDARD SPECIFICATIONS ANDTHE 2024 CALIFORNIA BUILDING CODE.6.CONTRACTOR SHALL CONSTRUCT EXPANSION JOINTS PER DETAIL 3 ON SHEET C1.4 AND CITYSTANDARD SPECIFICATIONS AT ALL LOCATIONS WHERE PROPOSED AND FUTURE CONCRETEIMPROVEMENTS ABUT.7.CONTRACTOR SHALL CONSTRUCT LAP JOINT PER DETAIL 1 ON SHEET C1.4 AT ALL LOCATIONS WHEREPROPOSED AND EXISTING ASPHALT ABUT.8.TRUNCATED DOMES TO BE CAST IN PLACE REPLACEABLE BY ADA SOLUTIONS OR EQUAL. REFER TOCITY OF MERCED STANDARD DETAIL SCG-2.9.CONTRACTOR SHALL CONSTRUCT SURVEY MONUMENT FRAME AND COVER IN ACCORDANCE WITHCITY OF MERCED STANDARD DETAIL M-1.

TSB
TSBJP

JPJPJPJPJPJPJPJPJP
JP
TSB

TELUTIL
APN: 059-024-081

BIKELANE

BIKELANE

SIGNALAHEADBIKELANESTOP STOP

EXISTING RIGHT-OF-WAY

EXISTING RIGHT-OF-WAY
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
28+00
29+00 W CHILDS AVE
AC1.4CANAL ST

PROPOSED RIGHT-OF-WAY YET TOBE ACQUIRED BY CITY OF MERCED 65'30'35'
65'30'35'
60'30'30'
18'18'32'50'
27+53.09 22' DW
28+90.16 22' DW
31+02.93 32' DW
PT: 28+27.41
29+42.61 30' DW
26+79.39 22' DW
23+23.66 T1-ELC (100W)
25+28.65 T1-ELC (100W)
27+25.23 T1-ELC (100W)
29+19.62 T1-ELC (100W)28+28.91 T1-ELC (100W)
JP

JPJPJPJPJPJPJP TELELCELC
TEL

PAC SLB ELB ELBELB

BIKELANE
STOPAPN: 059-024-081EXISTINGBUILDINGEXISTINGBUILDINGEXISTING RIGHT-OF-WAY

EXISTING RIGHT-OF-WAY

EXISTING RIGHT-OF-WAY
21+00
22+00
20+00
21+00
22+00
23+00
24+00
25+00
26+0027+0028+00
29+00

S CANAL ST

STRATFORD CTSEVILLE WAYCARTMELL DR
BC1.4

CANAL STPROPOSED RIGHT-OF-WAY YET TOBE ACQUIRED BY CITY OF MERCED 65'30'35'
64'32'32'
64'32'32'
60'30'30'
±19.5'18' ±19.5'18' 18'18'32'50'PI: 19+74.10 PC: 26+21.46 PT: 28+27.41
23+62.03 22' DW
21+37.15 16' DW
22+47.12 22' DW
21+82.83 22' DW
24+85.18 T1-ELC (100W)28+28.91 T1-ELC (100W)

JPJPJPJP
TELELV

PAC SLB ELBELB
APN: 059-024-081EXISTINGBUILDINGEXISTINGBUILDINGEXISTINGBUILDING EXISTING RIGHT-OF-WAYEXISTING RIGHT-OF-WAY14+0015+00 16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00

SEVILLE WAYCARTMELL DR
PROPOSED RIGHT-OF-WAY YET TOBE ACQUIRED BY CITY OF MERCED64'32'32' 64'32'32' ±19.5'18'PI: 19+73.71PI: 19+74.10PC: 14+13.62PT: 13+75.68 PT: 15+39.19
23+62.03 22' DW
21+37.15 16' DW
22+47.12 22' DW
21+82.83 22' DW

DIMENSION AND PAVING PLAN

AS SHOWN APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 06/30/2025 17:13 PLOTTED BY: TtophamDWGNAME: F:\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C3.1 DIM.dwg C3.1COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC 23-3406CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION
01" = 40204040'
01" = 40204040'

SEE ABOVE RIGHT

SEE BELOW LEFT

SEE ABOVE RIGHT

SEE BELOW LEFT
01" = 40204040'
GENERAL GRADING NOTES1.ALL CURBS, GUTTERS, SIDEWALKS, CURB RETURNS, AND PAVEMENT SECTIONS PER CROSS SECTIONON SHEET C1.4 AND CITY OF MERCED STANDARDS AND SPECIFICATIONS.2.CONTRACTOR SHALL VERIFY ALL REQUIREMENTS OF THE PROJECT GEOTECHNICAL REPORT FOR SOILSPREPARATION, SUB-GRADE PREPARATION AND OVER-EXCAVATION REQUIREMENTS BEFORECONSTRUCTION. IF A DISCREPANCY EXISTS, CONTRACTOR TO NOTIFY THE ENGINEER IMMEDIATELY.SITE PLAN GENERAL NOTES1.ALL DIMENSIONS AS SHOWN ON THIS PLAN ARE TAKEN FROM EITHER THE CENTERLINE, CENTERLINEMONUMENT, FACE OF CURB, EDGE OF SIDEWALK, CENTERLINE OF STRIPING, AND OR PROPOSED/EXISTING RIGHT-OF-WAY. REFER TO CROSS-SECTIONS OF SHEET C1.4.2.CONTRACTOR TO REFER TO PROJECT FINAL MAP FOR LOCATING, ORIENTATION, AND ALIGNMENT OFPROPOSED CENTERLINES, LOT LINES, RIGHT-OF-WAYS, AND EASEMENTS, IF THERE IS A DISCREPANCYBETWEEN THESE PLANS AND THE PROJECT FINAL MAP, CONTRACTOR TO NOTIFY THE ENGINEERIMMEDIATELY.3.CONTRACTOR SHALL CONSTRUCT PAVEMENT, CURB, GUTTER, AND SIDEWALK SECTIONS AS SHOWNON THESE PLANS. PAVEMENT SECTION TO BE IN ACCORDANCE WITH STREET SECTION TABLE ONSHEET C1.4 AND PER CITY OF MERCED STANDARDS AND SPECIFICATIONS.4.CONTRACTOR SHALL CONSTRUCT 6" VERTICAL CURB, GUTTER, AND SIDEWALK IN ACCORDANCE WITHCITY OF MERCED STANDARD DETAIL SCG-1 AND IN ACCORDANCE WITH CITY STANDARDSPECIFICATIONS.5.CONTRACTOR SHALL CONSTRUCT ADA ACCESSIBLE CURB RAMPS IN ACCORDANCE WITH CITY OFMERCED STANDARD DETAIL SCG-2 AND IN ACCORDANCE WITH CITY STANDARD SPECIFICATIONS ANDTHE 2024 CALIFORNIA BUILDING CODE.6.CONTRACTOR SHALL CONSTRUCT EXPANSION JOINTS PER CITY OF MERCED STANDARD DETAIL 3 ONSHEET C1.4 AND CITY STANDARD SPECIFICATIONS AT ALL LOCATIONS WHERE PROPOSED AND FUTURECONCRETE IMPROVEMENTS ABUT.7.CONTRACTOR SHALL CONSTRUCT LAP JOINT PER DETAIL 1 ON SHEET C1.4 AT ALL LOCATIONS WHEREPROPOSED AND EXISTING ASPHALT ABUT.8.TRUNCATED DOMES TO BE CAST IN PLACE REPLACEABLE BY ADA SOLUTIONS OR EQUAL. REFER TOCITY OF MERCED STANDARD DETAIL SCG-2.9.CONTRACTOR SHALL CONSTRUCT SURVEY MONUMENT FRAME AND COVER IN ACCORDANCE WITHCITY OF MERCED STANDARD DETAIL M-1. 20+00
21+00
22+00
23+00
24+00±160.89 P±161.00 P±160.85 P±160.80 P±160.97 P±161.05 P±161.18 P±161.07 P±160.74 P±160.66 P±160.47 PPI: 19+74.10 161.16TCHP160.77TCLP 161.20TCHP160.72TCLP161.14TCDWY 161.12TCDWY 161.00TCDWY 160.84TCDWY 161.06TCDWY161.07TCDWY 160.91TCDWY 160.93TCDWY160.39 P160.63 P160.73 P160.61 P160.48 P160.36 P160.57 P160.81 P160.69 P 161.03 CC161.15 CC161.28 CC 161.26 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC161.03 CC 161.32 CC161.39 CC160.84 CC160.92 CC161.35 CC161.28 CC160.90 CC160.97 CC 161.18 CC161.12 CC161.32 CC161.25 CC 161.09 CC161.02 CC161.04 CC160.96 CC 161.14 CC161.06 CC161.24 CC161.17 CC161.25 CC161.20 CC 160.14 P

S CANAL ST

SEVILLE WAYCARTMELL DRIVE

PROPOSED RIGHT-OF-WAY YET TOBE ACQUIRED BY CITY OF MERCED ±160.59 P

EXISTING RIGHT-OF-WAY EXISTING RIGHT-OF-WAY

2.71%

7.19%

7.19%

7.19%

7.19%0.25% 0.25%0.25% 0.25% 0.48%

2.13%

2.46%

2.66%

2.85%

3.06%

2.00%

1.54%

1.13%
24+00
25+00
26+00 27+00
28+00
±160.96 P
±161.16 P±161.00 P±160.98 P±160.94 P±160.89 P±161.00 P
±160.37 P
±161.25 P
±160.91 P±160.47 P
PC: 26+21.46
PT: 28+27.41161.07TCBC160.84TCLP161.20TCHP 161.23TCHP
160.93TCRTN/LP160.97TCEC
160.91TCRTN
161.18TCRTN161.14TCRTN
160.96TCRTN
160.91 P0.30%

0.30%

0.54%

0.84%

0.54%6.62%

7.50%160.81 P160.69 P160.55 P160.52 P160.64 P160.77 P160.69 P160.85 P 160.72 P
160.60 P
160.77 P161.09 P
160.93 P160.87 P
160.65 P
161.01 P
160.59 P±161.18 P±160.99 P
161.26 CC161.12 CC161.09 CC 161.29 CC161.26 CC161.19 CC160.96 CC161.03 CC161.32 CC161.39 CC 161.35 CC161.42 CC161.22 CC 161.17 CC161.09 CC161.06 CC160.98 TC/CC
161.00 CC161.06 CC161.08 CC161.24 CC161.32 CC161.15 CC
160.78 CC
160.96 CC160.94 CC161.05 TC/CC
160.60 P
160.80 P
160.90 CC160.83 CC

7.50%160.98 CC160.55 P
160.99 CC161.01 CC161.10 TC/CC
160.94 TC/CC160.54 P
161.22 CCS CANAL ST

STRATFORD COURT

EXISTING RIGHT-OF-WAY

1.88%

1.93%2.39%

2.04%

2.98%

1.92%

1.11%0.73%0.29% 0.25%
GB
161.15 P

1.13%

1.51%

3.22%

2.59%

2.29%1.99%

BIKELANESTOP
22+00
23+00
24+00
25+00
26+00
28+00
29+00
±160.96 P±160.87 P±161.02 P±161.20 P±161.44 P±161.63 P±161.78 P±161.96 P ±161.15 P ±161.23 P
±160.37 PPT: 28+27.41
±161.22 P

0.54% 0.84%

7.50%161.18TCRTN
160.91TCRTN
160.93TCRTN/LP
161.17TCRTN/LP
160.97TCEC

7.50%

W CHILDS AVECANAL STREET

EXISTING RIGHT-OF-WAY

1.93%2.39%

2.98%

0.35%

2.18%

2.95%

4.42%

1.92%1.11%0.73% 161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.59 CC161.76 CC161.92 CC162.10 CC162.27 CC162.44 CC161.42 CC 161.17 CC161.09 CC161.13 CC161.06 CC
161.02 CC160.98 TC/CC
161.00 CC161.06 CC161.08 CC160.94 TC/CC
161.09 TC/CC160.86 P161.03 P161.20 P161.37 P161.54 P161.71 P161.88 P 160.91 P160.93 P160.54 P
160.87 P
160.60 P
160.83 CC160.90 CC
161.12 TC/CC161.29 CC161.37 CC161.11 CC161.08 CC160.98 CC 160.79 P160.80 P
160.55 P161.22 CC161.01 CC160.99 CC
GB 0.34%0.34%GB

GRADING AND DRAINAGE PLAN

AS SHOWN APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 06/30/2025 17:04 PLOTTED BY: TtophamDWGNAME: F:\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C4.1-4.2 GRD.dwg C4.1COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC 23-3406CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION
01" = 20102020' SEE BELOW LEFT

SEE ABOVE RIGHT

SEE ABOVE RIGHT
SEE BELOW LEFTSEE SHEET C4.2
01" = 20102020'
01" = 20102020'
GENERAL GRADING NOTES1.ALL CURBS, GUTTERS, SIDEWALKS, CURB RETURNS, AND PAVEMENT SECTIONS PER CROSS SECTIONON SHEET C1.4 AND CITY OF MERCED STANDARDS AND SPECIFICATIONS.2.CONTRACTOR SHALL VERIFY ALL REQUIREMENTS OF THE PROJECT GEOTECHNICAL REPORT FOR SOILSPREPARATION, SUB-GRADE PREPARATION AND OVER-EXCAVATION REQUIREMENTS BEFORECONSTRUCTION. IF A DISCREPANCY EXISTS, CONTRACTOR TO NOTIFY THE ENGINEER IMMEDIATELY.SITE PLAN GENERAL NOTES1.ALL DIMENSIONS AS SHOWN ON THIS PLAN ARE TAKEN FROM EITHER THE CENTERLINE, CENTERLINEMONUMENT, FACE OF CURB, EDGE OF SIDEWALK, CENTERLINE OF STRIPING, AND OR PROPOSED/EXISTING RIGHT-OF-WAY. REFER TO CROSS-SECTIONS OF SHEET C1.4.2.CONTRACTOR TO REFER TO PROJECT FINAL MAP FOR LOCATING, ORIENTATION, AND ALIGNMENT OFPROPOSED CENTERLINES, LOT LINES, RIGHT-OF-WAYS, AND EASEMENTS, IF THERE IS A DISCREPANCYBETWEEN THESE PLANS AND THE PROJECT FINAL MAP, CONTRACTOR TO NOTIFY THE ENGINEERIMMEDIATELY.3.CONTRACTOR SHALL CONSTRUCT PAVEMENT, CURB, GUTTER, AND SIDEWALK SECTIONS AS SHOWNON THESE PLANS. PAVEMENT SECTION TO BE IN ACCORDANCE WITH STREET SECTION TABLE ONSHEET C1.4 AND PER CITY OF MERCED STANDARDS AND SPECIFICATIONS.4.CONTRACTOR SHALL CONSTRUCT 6" VERTICAL CURB, GUTTER, AND SIDEWALK IN ACCORDANCE WITHCITY OF MERCED STANDARD DETAIL SCG-1 AND IN ACCORDANCE WITH CITY STANDARDSPECIFICATIONS.5.CONTRACTOR SHALL CONSTRUCT ADA ACCESSIBLE CURB RAMPS IN ACCORDANCE WITH CITY OFMERCED STANDARD DETAIL SCG-2 AND IN ACCORDANCE WITH CITY STANDARD SPECIFICATIONS ANDTHE 2024 CALIFORNIA BUILDING CODE.6.CONTRACTOR SHALL CONSTRUCT EXPANSION JOINTS PER CITY OF MERCED STANDARD DETAIL 3 ONSHEET C1.4 AND CITY STANDARD SPECIFICATIONS AT ALL LOCATIONS WHERE PROPOSED AND FUTURECONCRETE IMPROVEMENTS ABUT.7.CONTRACTOR SHALL CONSTRUCT LAP JOINT PER DETAIL 1 ON SHEET C1.4 AT ALL LOCATIONS WHEREPROPOSED AND EXISTING ASPHALT ABUT.8.TRUNCATED DOMES TO BE CAST IN PLACE REPLACEABLE BY ADA SOLUTIONS OR EQUAL. REFER TOCITY OF MERCED STANDARD DETAIL SCG-2.9.CONTRACTOR SHALL CONSTRUCT SURVEY MONUMENT FRAME AND COVER IN ACCORDANCE WITHCITY OF MERCED STANDARD DETAIL M-1.

SIGNALAHEADBIKELANESTOP
25+00
26+00
27+00
28+00
29+00±161.78 P±161.96 P±162.14 P±162.25 P±162.46 P±162.60 P±162.75 P±162.93 P±163.15 P162.64TCDWY 162.89TCDWY162.55TCDWY 163.26TCDWY162.80TCDWY 163.43TCDWY163.36TCDWY

W CHILDS AVE

PROPOSED RIGHT-OF-WAY YET TOBE ACQUIRED BY CITY OF MERCED W 5TH STREET

EXISTING RIGHT-OF-WAY

7.94%

8.78%

6.73%

9.44%

2.95%

4.42%

1.67%

0.73%

1.89%
GBGB
GBGB
GBGB GBGB GB162.27 CC162.44 CC162.61 CC162.77 CC 163.28 CC163.40 CC163.77 CC 161.71 P161.88 P162.05 P162.22 P162.39 P162.56 P162.73 P162.90 P163.07 P162.74 CC162.81 CC162.66 CC162.74 CC 163.06 CC163.13 CC162.98 CC163.05 CC 163.33 CC163.40 CC163.33 CC163.40 CC163.69 CC163.77 CC163.35 CC163.42 CC163.02 CC163.10 CC162.88 CC162.95 CC 0.10%0.34%0.34%0.34%0.34%

BIKELANE

AHEADBIKELANESTOP
28+00
29+00
30+00
31+00
32+00±162.75 P±162.93 P±163.15 P±163.32 P±163.48 P±163.75 P±164.04 P±164.89 P ±165.60 P
163.55TCDWY 164.36TCDWY163.26TCDWY 163.97TCDWY163.43TCDWY163.36TCDWY 164.77TCEND

W CHILDS AVE

PROPOSED RIGHT-OF-WAY YET TOBE ACQUIRED BY CITY OF MERCED W 5TH STREET

LOS BANOS HIGHWAYEXISTING RIGHT-OF-WAY

6.73%

9.44%

7.93%

0.73%

1.89%

2.34%

3.69%

GBGB GB
GB GBGB163.28 CC163.40 CC163.77 CC163.79 CC163.96 CC164.13 CC164.62 CC 162.73 P162.90 P163.07 P163.24 P163.41 P 164.06 P164.59 P164.39 P163.58 P163.33 CC163.40 CC163.33 CC163.40 CC163.69 CC163.77 CC163.73 CC163.80 CC 164.11 CC164.18 CC164.43 CC164.51 CC164.87 CC164.95 CC163.35 CC163.42 CC 163.71 CC0.34% 1.03%0.10%0.34%

GRADING AND DRAINAGE PLAN

AS SHOWN APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 06/30/2025 17:04 PLOTTED BY: TtophamDWGNAME: F:\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C4.1-4.2 GRD.dwg C4.2COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC 23-3406CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION
01" = 20102020' SEE BELOW LEFT
SEE SHEET C4.1
01" = 20102020'

SEE ABOVE RIGHT
KEY NOTESSEE TOPOGRAPHIC AND DEMOLITION SHEET C2.1 FOR ADDITIONAL REMOVAL, REPLACEMENT ANDPROTECTION NOTES.CONTRACTOR SHALL EXCAVATE EXISTING STORM DRAINAGE MANHOLE TO VERIFY THE HORIZONTALAND VERTICAL ALIGNMENT PRIOR TO THE INSTALLATION OF THE STORM DRAINAGE SYSTEM.CONTRACTOR SHALL INFORM THE ENGINEER IF THE ALIGNMENTS ARE DIFFERENT THAN SHOWN.CONTRACTOR SHALL CONNECT TO EXISTING STORM DRAINAGE MANHOLE PER CITY OF MERCEDSTANDARDS AND SPECIFICATIONS.CONTRACTOR SHALL INSTALL 48" STORM DRAIN MANHOLE PER CITY OF MERCED STANDARDDETAIL SD-11.CONTRACTOR SHALL INSTALL CATCH BASIN PER CITY OF MERCED STANDARD DETAIL SD-3.

A
BC
TSB
TSBJP

JPJPJPJPJPJPJPJPJP
JP
TSB

TELUTIL
APN: 059-024-081

BIKELANE

BIKELANE

SIGNALAHEADBIKELANESTOP STOP
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
28+00
29+00 W CHILDS AVECANAL ST

PROPOSED RIGHT-OF-WAY YET TOBE ACQUIRED BY CITY OF MERCED Ex.24"SS
Ex.12"SS Ex.12"SSEx10"W Ex10"WEx6"W
Ex12"W
Ex36"IRR
Ex12"SD
3 1
2 1a
2a
EX4EX3 EX2 EX1
18"SD
12"SD
JP

JPJPJPJPJPJPJP TELELCELC
TEL

PAC SLB ELB ELBELB

BIKELANE
STOPAPN: 059-024-081EXISTINGBUILDINGEXISTINGBUILDING
21+00
22+00
20+00
21+00
22+00
23+00
24+00
25+00
26+0027+0028+00
29+00

S CANAL ST

STRATFORD CTSEVILLE WAYCARTMELL DR

CANAL STPROPOSED RIGHT-OF-WAY YET TOBE ACQUIRED BY CITY OF MERCED

B B B B B BC C C
C
C
Ex.12"SS
Ex.24"SSEx.24"SS
Ex.8"SS
Ex.8"SS
Ex.24"SSEx12"WEx12"W Ex12"W Ex12"W Ex12"W
Ex12"SD
6 5 34
12 1a
4a5a6a 2a EX4
EX3
EX5EX6EX718"SD 18"SD 18"SD 18"SD12"SD

JPJPJPJP
TELELV

PAC SLB ELBELB
APN: 059-024-081EXISTINGBUILDINGEXISTINGBUILDINGEXISTINGBUILDING Ex18"SD14+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00

SEVILLE WAYCARTMELL DR

PROPOSED RIGHT-OF-WAY YET TOBE ACQUIRED BY CITY OF MERCED

A B BC C
Ex.8"SS
Ex.8"SS
Ex.24"SSEx.24"SSEx.24"SSEx.24"SS Ex12"WEx12"W Ex12"W Ex12"WEx12"W Ex12"WEx18"SDEx12"W 6 55a6aD1D1a EX6EX7EX8 EX9
D2
D2b
18"SD 18"SD

COMPOSITE UTILITY PLAN

AS SHOWN APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 06/30/2025 16:52 PLOTTED BY: TtophamDWGNAME: F:\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C5.1 UTIL.dwg C5.1COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC 23-3406CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION
01" = 40204040'
01" = 40204040'

SEE ABOVE RIGHT

SEE BELOW LEFT

SEE ABOVE RIGHT

SEE BELOW LEFT
01" = 40204040'
KEY NOTESSEE TOPOGRAPHIC AND DEMOLITION SHEET C2.1 FOR ADDITIONAL REMOVAL, REPLACEMENT ANDPROTECTION NOTES.CONTRACTOR SHALL EXCAVATE EXISTING STORM DRAINAGE MANHOLE TO VERIFY THE HORIZONTALAND VERTICAL ALIGNMENT PRIOR TO THE INSTALLATION OF THE STORM DRAINAGE SYSTEM.CONTRACTOR SHALL INFORM THE ENGINEER IF THE ALIGNMENTS ARE DIFFERENT THAN SHOWN.CONTRACTOR SHALL CONNECT TO EXISTING STORM DRAINAGE MANHOLE PER CITY OF MERCEDSTANDARDS AND SPECIFICATIONS.CONTRACTOR SHALL INSTALL 48" STORM DRAIN MANHOLE PER CITY OF MERCED STANDARDDETAIL SD-11.CONTRACTOR SHALL INSTALL CATCH BASIN PER CITY OF MERCED STANDARD DETAIL SD-3.

A
BC
JPJPJP
ELV

PAC SLB ELB

GVGV GV
ELB
14+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00

CARTMELL DR
±161.05 P±161.18 P±161.07 P±160.74 P±160.66 P±160.47 P

PROPOSED RIGHT-OF-WAY YET TOBE ACQUIRED BY CITY OF MERCED PI: 19+73.71PI: 19+74.10PC: 14+13.62PT: 15+39.19
161.16TCHP160.77TCLP
±160.59 P
A B C 161.12 EG161.00 EG161.08 EG160.67 EG160.37 EGEx.24"SSEx.24"SSEx.24"SS Ex12"WEx12"W Ex12"W Ex12"WEx12"WEx18"SDEx12"W 66aD1D1a EX7EX8 EX9
D2
D2b
18"SD 18"SD
140142144146148150152154156158160162164166168170
140142144146148150152154156158160162164166168170
14+0015+0016+0017+0018+0019+0020+0021+0022+00 STA: 21+50.00 MATCH LINE152.53FL(24")S152.63FL(24")N152.83FL(8")W160.97RIMEX-SSMH-EX7STA: 21+12.01 152.12FL(24")S152.12FL(24")N159.57RIMEX-SSMH-EX8STA: 17+05.59 EX 24"SSEX 24"SSEX 24"SS
148.87FL(18")S148.88FL(18")E148.87FL(18")N159.77RIMEX-SDMH-D1STA: 16+08.02 Ex 18"SDEx 18"SD 371LF 18"SD S=0.0015327LF 18"SD S=0.0015 149.43FL(18")S149.43FL(18")N155.50FL(12")E160.48RIMSDMH-6STA: 19+79.06 PROPOSED GRADE @ FL(R)EXISTING GRADE @ CL
SDCB-6a - SDMH-6STA @ 6a = 19+79.06INV @ 6a = 155.57INV @ 6 = 155.50SLOPE = 0.50%SIZE = 12"LENGTH = 15LFOFFSET = 17.875 Ex12"WEx12"WEx12"WEx12"WEx12"W Ex12"W

0.50%
STA: 19+79.11GB: 159.90
STA: 21+32.13GB: 160.66STA: 21+06.74CL - CARTMELL DRIVE STA: 19+74.10TC/BEGIN (R)
S. CANAL STREET(STA. 14+00 TO 22+00)

AS SHOWN
01" = 40204040'

APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 07/01/2025 09:30 PLOTTED BY: CvanderveenDWGNAME: \\Nserver\northstar-data\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C6.1-6.2 CANAL ST.dwgC6.1COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC server\CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION
S. CANAL STREET
S. CANAL STREET(SEE SHEET C6.2)
S. CANAL STREET(EXISTING ROADWAY)

CARTMELL DRIVE(EXISTING ROADWAY)
KEY NOTESSEE TOPOGRAPHIC AND DEMOLITION SHEET C2.1 FOR ADDITIONAL REMOVAL, REPLACEMENT ANDPROTECTION NOTES.CONTRACTOR SHALL EXCAVATE EXISTING STORM DRAINAGE MANHOLE TO VERIFY THE HORIZONTALAND VERTICAL ALIGNMENT PRIOR TO THE INSTALLATION OF THE STORM DRAINAGE SYSTEM.CONTRACTOR SHALL INFORM THE ENGINEER IF THE ALIGNMENTS ARE DIFFERENT THAN SHOWN.CONTRACTOR SHALL CONNECT TO EXISTING STORM DRAINAGE MANHOLE PER CITY OF MERCEDSTANDARDS AND SPECIFICATIONS.CONTRACTOR SHALL INSTALL 48" STORM DRAIN MANHOLE PER CITY OF MERCED STANDARDDETAIL SD-11.CONTRACTOR SHALL INSTALL CATCH BASIN PER CITY OF MERCED STANDARD DETAIL SD-3.

A
BC
JP

JPJPJPJPJP TELELCELC
TEL

ELB ELB
GV

GV BIKELANE
STOPAPN: 059-024-081
22+00
21+00
22+00
23+00
24+00
25+00
26+0027+0028+00
29+00

S CANAL ST

STRATFORD CTCARTMELL DR
±160.96 P
±161.16 P±161.00 P±160.98 P±160.94 P±160.89 P±161.00 P±160.85 P±160.80 P±160.97 P±161.05 P±161.18 P±161.07 P ±161.15 P ±161.23 PPROPOSED RIGHT-OF-WAY YET TOBE ACQUIRED BY CITY OF MERCED ±160.37 P±161.25 P
±160.91 P±160.47 P
PC: 26+21.46
PT: 28+27.41
160.93TCRTN/LP160.97TCEC ±161.22 P0.30%0.30%0.54%

0.84%

0.54% 160.91TCRTN161.18TCRTN161.14TCRTN160.96TCRTN
161.07TCBC161.16TCHP 160.84TCLP161.20TCHP 161.23TCHP160.72TCLP 160.93TCRTN/LP160.97TCEC
160.91TCRTN161.18TCRTN161.14TCRTN160.96TCRTN±161.18 P±160.99 P

B B B B BC C
C
C
GB161.32 EG161.34 EG161.54 EG161.36 EG161.08 EG161.21 EG161.46 EG161.11 EG161.57 EG161.27 EG161.12 EG161.00 EG Ex.24"SSEx.24"SSEx.24"SSEx12"W Ex12"W Ex12"W Ex12"W Ex12"SD
5 34
12 1a
4a5a 2a EX4
EX3
EX5EX6EX718"SD 18"SD 18"SD 18"SD12"SD
140142144146148150152154156158160162164166168170
140142144146148150152154156158160162164166168170
21+0022+0023+0024+0025+0026+0027+0028+0029+00
EX 24"SS EX 24"SS EX 24"SS
152.53FL(24")S152.63FL(24")N152.83FL(8")W160.97RIMEX. SSMH-EX7STA: 21+12.01 153.05FL(24")S153.09FL(24")N153.86FL(8")W160.99RIMEX. SSMH-EX6STA: 23+86.69 153.33FL(24")S153.29FL(24")N154.12FL(8")W161.07RIMEX. SSMH-EX5STA: 26+95.84 154.33FL(12")W153.47FL(24")S153.52FL(12")NE154.33FL(12")E161.20RIMEX. SSMH-EX4STA: 28+57.45 Ex12"W Ex12"W Ex12"WEx12"W
EXISTING GRADE @ CL
STA: 28+27.4036" IRR X-ING
STA: 21+50.00 MATCH LINE
150.74FL(18")S150.74FL(18")N160.83RIMSDMH-3STA: 27+38.26 210LF 18"SD S=0.0020224LF 18"SD S=0.0018327LF 18"SD S=0.0015 149.92FL(18")S149.92FL(18")N155.75FL(12")E160.70RIMSDMH-5STA: 23+05.73 150.32FL(18")S150.32FL(18")N151.20FL(12")E160.92RIMSDMH-4STA: 25+30.21 151.51FL(12")S151.51FL(12")E160.77RIMSDMH-1STA: 28+33.85 PROPOSED GRADE @ FL(R)PROPOSED GRADE @ CL
SDCB-5a - SDMH-5STA @ 5a = 23+05.73INV @ 5a = 155.82INV @ 5 = 155.75SLOPE = 0.50%SIZE = 12"LENGTH = 15LFOFFSET = 17.875 SDCB-4a - SDMH-4STA @ 4a = 25+30.21INV @ 4a = 151.27INV @ 4 = 151.20SLOPE = 0.50%SIZE = 12"LENGTH = 15LFOFFSET = 17.875 SDCB-1a - SDMH-1STA @ 1a = 28+47.04INV @ 1a = 151.67INV @ 1 = 151.51SLOPE = 0.50%SIZE = 12"LENGTH = 31LFOFFSET = 17.875 25LF 12"SDS=0.0050150.88FL(18")S151.38FL(12")N151.38FL(12")W160.72RIMSDMH-2STA: 28+09.06 72LF 18"SD S=0.0020
-0.25% 0.48%-0.29% 0.25% -0.18%
STA: 21+32.13GB: 160.66
STA: 23+05.73GB: 160.22
STA: 24+05.25GB: 160.70
STA: 25+30.39GB: 160.34
STA: 26+85.82GB: 160.72
STA: 28+50.98GB: 160.43
STA: 21+06.74CL - CARTMELL DRIVE
STA: 26+85.55CL - STRATFORD COURT
STA: 23+75.75CL - SEVILLE WAY
STA: 26+21.46TC/BC (R)
STA: 28+27.41TC/EC (R)STA: 28+50.98TC/RTN (R)
STA: 28+12.48TC/RTN (L)
STA: 27+22.27TC/RTN (L)
STA: 28+82.85CL - W. CHILDS AVENUESDCB-2a - SDMH-2STA @ 2a = 28+08.68INV @ 2a = 151.42INV @ 2 = 151.38SLOPE = 0.50%SIZE = 12"LENGTH = 9LFOFFSET = 17.873 S. CANAL STREET(STA. 14+00 TO 22+00)

AS SHOWN
01" = 40204040'

APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 07/01/2025 09:29 PLOTTED BY: CvanderveenDWGNAME: \\Nserver\northstar-data\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C6.1-6.2 CANAL ST.dwgC6.2COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC server\CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION
S. CANAL STREET
W. CHILDS AVENUE(SEE SHEET C6.3)
S. CANAL STREET(EXISTING ROADWAY)
W. CHILDS AVENUE(EXISTING ROADWAY)
KEY NOTESSEE TOPOGRAPHIC AND DEMOLITION SHEET C2.1 FOR ADDITIONAL REMOVAL, REPLACEMENT ANDPROTECTION NOTES.CONTRACTOR SHALL EXCAVATE EXISTING STORM DRAINAGE MANHOLE TO VERIFY THE HORIZONTALAND VERTICAL ALIGNMENT PRIOR TO THE INSTALLATION OF THE STORM DRAINAGE SYSTEM.CONTRACTOR SHALL INFORM THE ENGINEER IF THE ALIGNMENTS ARE DIFFERENT THAN SHOWN.CONTRACTOR SHALL CONNECT TO EXISTING STORM DRAINAGE MANHOLE PER CITY OF MERCEDSTANDARDS AND SPECIFICATIONS.CONTRACTOR SHALL INSTALL 48" STORM DRAIN MANHOLE PER CITY OF MERCED STANDARDDETAIL SD-11.CONTRACTOR SHALL INSTALL CATCH BASIN PER CITY OF MERCED STANDARD DETAIL SD-3.

A
BC

JPJPJPJPJP
JP
GV

BIKELANE

SIGNALSTOP
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00 W CHILDS AVE±160.96 P±160.87 P±161.02 P±161.20 P±161.44 P±161.63 P±161.78 P±161.96 P±162.14 P±162.25 P±162.46 P±162.60 P±161.15 P±161.23 P

CANAL ST

PROPOSED RIGHT-OF-WAY YET TOBE ACQUIRED BY CITY OF MERCED ±160.37 P
65'30'35'
65'30'35'
60'30'30'
18'
PT: 28+27.41160.93TCRTN/LP161.12TCRTN160.97TCEC
±161.22 P

0.54% 0.84%
160.91TCRTN161.18TCRTN 162.62TCDWY162.87TCDWY162.52TCDWY160.93TCRTN/LP161.12TCRTN 160.97TCEC160.91TCRTN161.18TCRTN
GBGB
GBGB
GBGB 163.14 EG163.24 EG163.47 EG162.06 EG161.77 EG161.86 EG161.66 EG161.38 EG161.35 EG161.42 EG161.28 EG161.32 EG Ex.24"SS
Ex.12"SSEx10"W Ex6"W
Ex36"IRR
Ex12"SD
1 2
1a
2a
EX4EX3 EX2
18"SD
12"SD
144146148150152154156158160162164166168170172174
144146148150152154156158160162164166168170172174
21+0022+0023+0024+0025+0026+0027+0027+50 STA: 27+25.00 MATCH LINE EX 12"SS
154.33FL(12")W153.47FL(24")S153.52FL(12")NE154.33FL(12")E161.20RIMEX. SSMH-EX4STA: 21+77.35 154.31FL(12")W154.04FL(12")NE154.31FL(12")E161.24RIMEX. SSMH-EX3STA: 22+32.96 154.78FL(12")W154.78FL(12")E162.43RIMEX. SSMH-EX2STA: 26+11.50 Ex10"WEx6"W
EXISTING GRADE @ CL152.34FL(36")W152.34FL(36")E161.32RIMIRR-BOX-1STA: 22+51.98 152.79FL(36")W152.94FL(36")E161.68RIMEX-IRRMH-2STA: 24+18.83 152.81FL(36")W157.16FL(24")E163.36RIMEX-IRRMH-1STA: 26+99.66 EX 36"IRREX 36"IRR
STA: 22+33.70CL - S. CANAL STREET
PROPOSED GRADE @ FL (R)PROPOSED GRADE @ FL (R)
STA: 22+59.30TC/RTN (R)
STA: 21+23.50TC/MATCH EX. (R)
STA: 21+64.76TC/RTN (R)
W. CHILDS AVENUE(STA. 21+00 TO 27+50)

AS SHOWN
01" = 40204040'

APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 07/01/2025 09:25 PLOTTED BY: CvanderveenDWGNAME: \\Nserver\northstar-data\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C6.3 CHILDS AVE.dwgC6.3COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC server\CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION
W. CHILDS AVENUE
S. CANAL STREET(SEE SHEET C6.2)
W. CHILDS AVENUE(SEE SHEET C6.4)
KEY NOTESSEE TOPOGRAPHIC AND DEMOLITION SHEET C2.1 FOR ADDITIONAL REMOVAL, REPLACEMENT ANDPROTECTION NOTES.CONTRACTOR SHALL EXCAVATE EXISTING STORM DRAINAGE MANHOLE TO VERIFY THE HORIZONTALAND VERTICAL ALIGNMENT PRIOR TO THE INSTALLATION OF THE STORM DRAINAGE SYSTEM.CONTRACTOR SHALL INFORM THE ENGINEER IF THE ALIGNMENTS ARE DIFFERENT THAN SHOWN.CONTRACTOR SHALL CONNECT TO EXISTING STORM DRAINAGE MANHOLE PER CITY OF MERCEDSTANDARDS AND SPECIFICATIONS.CONTRACTOR SHALL INSTALL 48" STORM DRAIN MANHOLE PER CITY OF MERCED STANDARDDETAIL SD-11.CONTRACTOR SHALL INSTALL CATCH BASIN PER CITY OF MERCED STANDARD DETAIL SD-3.

A
BC
TSB
TSB
TSBJP

PPJPTSB
TSB
JPJPJP
TSBTEL
GV
UTIL

BIKELANE

SIGNALAHEADBIKELANESTOP
27+00
28+00
29+00
30+00
31+00
32+00±162.14 P±162.25 P±162.46 P±162.60 P±162.75 P±162.93 P±163.15 P±163.32 P±163.48 P±163.75 P±164.04 P±164.89 P±165.60 P PROPOSED RIGHT-OF-WAY YET TOBE ACQUIRED BY CITY OF MERCED162.62TCDWY162.87TCDWY 163.54TCDWY 164.36TCDWY162.52TCDWY 163.25TCDWY 163.97TCDWY GBGB
GBGB

GBGB GB
GB GBGB 164.63 CC164.37 CC164.22 CC163.96 CC163.80 CC163.76 CC163.76 CC163.34 EG163.33 EG163.46 EG163.14 EG163.24 EG163.47 EG162.06 EG Ex.12"SS Ex10"WEx6"W EX1
144146148150152154156158160162164166168170172174
144146148150152154156158160162164166168170172174
26+5027+0028+0029+0030+0031+0032+0032+50
STA: 27+25.00 MATCH LINE
EX 12"SS
Ex10"W
155.15FL(12")W155.15FL(12")N163.79RIMEX. SSMH-EX1STA: 30+26.06 STA: 28+19.8510"X6" TEE
Ex6"W
EXISTING GRADE @ CL
152.81FL(36")W157.16FL(24")E163.36RIMEX-IRRMH-1STA: 26+99.66

0.35%

1.03%STA: 30+83.93GB: 163.47
STA: 31+61.37GB: 164.26
PROPOSED GRADE @ FL (R)
STA: 31+61.37TC/END (R)
W. CHILDS AVENUE(STA. 26+50 TO 32+50)

AS SHOWN
01" = 40204040'

APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 07/01/2025 09:24 PLOTTED BY: CvanderveenDWGNAME: \\Nserver\northstar-data\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C6.4 CHILDS AVE.dwgC6.4COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC server\CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION
W. CHILDS AVENUE
STATE ROUTE 59(EXISTING ROADWAY)
W. CHILDS AVENUE(SEE SHEET C6.3)
STATE ROUTE 59(EXISTING ROADWAY)

BIKELANE

BIKELANE

SIGNALAHEADBIKELANESTOP STOPINLET PROTECTION (TYP)

INLET PROTECTION (TYP)

INLET PROTECTION (TYP)

EROSION CONTROL PLAN

AS SHOWN
01" = 60306060'LEGENDINLET PROTECTION (SEE DETAILS "A", "B", C, AND "D")SHALL BE PLACED AROUND ALL CATCH BASINS WITHINTHE PROJECT DRAINAGE LIMITS; INCLUDING BUT NOTLIMITED TO ALL LANDSCAPE DRAINAGE. ALSO, INLETPROTECTION SHALL BE PLACED AT THE FIRST INLETDOWNSTREAM FROM THE PROJECT SITE (ON EITHERDIRECTION).CONCRETE WASHOUT AREA (SEE DETAIL "E")STRAW WATTLE (SEE DETAIL "F") TO BE PLACED AT ALLLOCATIONS SHOWN. STRAW WATTLES SHALL ALSO BEPLACED AT THE FRONT OF ANY LOT WHERE ANUNDERCUT IS NOT PRESENT.TEMPORARY STABILIZED CONSTRUCTION ENTRANCE(SEE DETAIL "H") TO BE DETERMINED BY CONTRACTOR INFIELD.

APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 06/30/2025 12:31 PLOTTED BY: TtophamDWGNAME: F:\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C7.1 ERS.dwg C7.1COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC 23-3406CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION

EROSION CONTROL PLAN,NOTES AND DETAILS

AS SHOWN

FLOW FLOW
SPILLWAY, 1 BAG HIGH

EDGE OF PAVEMENT (LIP)
CATCH BASINGRAVEL BAGS2-BAGS HIGHATYPICAL PROTECTION FOR INLET ON SUMP NTS FLOW
SPILLWAY, 1 BAG HIGH

EDGE OF PAVEMENT (LIP)
CATCH BASINGRAVEL BAGS2-BAGS HIGH
FLOW

BTYPICAL PROTECTION FOR INLET ON GRADE NTS
NOTES:1. INTENDED FOR SHORT-TERM USE.2. USE TO INHIBIT NON-STORM WATER FLOW.3. ALLOW FOR PROPER MAINTENANCE AND CLEAN UP.4. BAGS MUST BE REMOVED AFTER ADJACENT OPERATION IS COMPLETED.5. NOT APPLICABLE IN AREAS WITH HIGH SILTS AND CLAYS WITHOUT FILTER FABRIC.DI PROTECTION TYPE 3 - GRAVEL BAGTHE GRAVEL BAG BARRIER (TYPE 3) IS SHOWN IN THE FIGURES. FLOW FROM A SEVERESTORM SHOULD NOT OVERTOP THE CURB. IN AREAS OF HIGH CLAY AND SILTS, USEFILTER FABRIC AND GRAVEL AS ADDITIONAL FILTER MEDIA. GRAVEL BAGS SHOULD BEUSED DUE TO THEIR HIGH PERMEABILITY.1.USE SAND BAG MADE OF GEOTEXTILE FABRIC (NOT BURLAP) AND FILL WITH 0.75 IN.ROCK OR 0.25 IN. PEA GRAVEL.2.CONSTRUCT ON GENTLY SLOPING STREET.3.LEAVE ROOM UPSTREAM OF BARRIER FOR WATER TO POND AND SEDIMENT TOSETTLE.4.PLACE SEVERAL LAYERS OF SAND BAGS - OVERLAPPING THE BAGS AND PACKINGTHEM TIGHTLY TOGETHER.5.LEAVE GAP OF ONE BAG ON THE TOP ROW TO SERVE AS A SPILLWAY. FLOW FROM ASEVERE STORM (E.G., 10 YEAR STORM) SHOULD NOT OVERTOP THE CURB.6.THIS DETAIL IS TO BE USED ON EXISTING STREETS WHERE SILTED FLOW IS TO BEINTERCEPTED (CAUGHT) PRIOR TO ENTERING THE STORM DRAIN SYSTEM.SANDBAGS CAN ALSO BE USED WHEN THE ROUGH GRADED STREETS HAVEPOURED INPLACE CONCRETE SURROUNDING THE INLET TO CREATE A "FLOW LINE"WHERE A DAM CAN BE ACHIEVED TO PROTECT THE STORM SYSTEM FROM THEINFLOW OF SEDIMENT.CDI PROTECTION - TYPE 3 TEMPORARY STABILIZED CONSTRUCTION ENTRANCEDESIGN AND CONSTRUCTION SPECIFICATIONS:1.THE TEMPORARY STABILIZED CONSTRUCTION ENTRANCE SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS OFLATEST EDITION OF THE CALIFORNIA STORMWATER HANDBOOK, DETAIL TC-1. WHERE THERE IS A DISCREPANCY BETWEEN THIS DETAIL AND THE CALIFORNIASTORMWATER HANDBOOK, THE HANDBOOK SHALL GOVERN.2.CONTRACTOR SHALL CONSTRUCT A STABILIZED CONSTRUCTION ENTRANCE AT EACH ENTRANCE TO THE PROJECT SITE AND SHALL BE CONSTRUCTED ONLEVEL GROUND.3.THE MATERIAL FOR CONSTRUCTION OF THE PAD SHALL BE 3 TO 6 INCH DIA. STONE.4.THE THICKNESS FOR THE PAD SHALL NOT BE LESS THAN 12 INCHES OR AS RECOMMENDED BY SOILS ENGINEER.5.THE WIDTH OF THE PAD SHALL NOT BE LESS THAN 30' OR THE FULL WIDTH OF ALL POINTS OF INGRESS OR EGRESS, WHICHEVER IS GREATER.6.THE LENGTH OF THE PAD SHALL BE AS REQUIRED, BUT NOT LESS THAN 50 FEET.7.THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. THIS MAYREQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND, AND REPAIR AND/OR CLEAN OUT ANY MEASURES USED TO TRAPSEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC RIGHT-OF-WAY SHALL BE REMOVED IMMEDIATELY.8.WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS REQUIRED, ITSHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP, SEDIMENT BASIN, OR SEDIMENT SWALE.ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE THROUGH USE OF GRAVEL BAGS, GRAVEL, BOARDS,OR OTHER APPROVED METHODS.9.CONTRACTOR TO REMOVE AND DISPOSE OF STABILIZED CONSTRUCTION ENTRANCE UPON COMPLETION OF CONSTRUCTION.10.CONSTRUCTION AND MAINTENANCE SHALL BE IN ACCORDANCE WITH THE 2003 CALIFORNIA STORMWATER BMP HANDBOOK.EXISTING PAVED ROADWAY50' MINOR FOUR TIMES THE CIRCUMFERENCE OF THE LARGESTCONSTRUCTION VEHICLE TIRE, WHICHEVER IS GREATER BERM 8" HEIGHTBY 36" WIDTH
20' R MIN
30' MIN

WIDTH AS REQUIREDTO ACCOMMODATEANTICIPATED TRAFFICA
A

DITCHMATCHEXISTINGGRADE
12" MIN, UNLESS OTHERWISESPECIFIED BY A SOILS ENGINEER
CRUSHED AGGREGATEGREATER THAN 3" BUT SMALLERTHAN 6"FABRIC FILTERCORRUGATED STEEL PANELS

OR FOUR TIMES THE CIRCUMFERENCE OF THE LARGESTCONSTRUCTION VEHICLE TIRE, WHICHEVER IS GREATER

CORRUGATEDSTEEL PANELSWIDTH AS REQUIREDTO ACCOMMODATEANTICIPATED TRAFFICA A
DITCH
B B

EXISTING PAVED ROADWAY

MATCH EXISTING GRADE

NTSSECTION A-ANTSSECTION B-BORIGINALGRADE
H3TEMPORARY STABILIZED CONSTRUCTION ENTRANCE NTS
12" MIN, UNLESS OTHERWISESPECIFIED BY A SOILS ENGINEER
CRUSHED AGGREGATEGREATER THAN 3" BUT SMALLERTHAN 6"FABRIC FILTERORIGINAL GRADE H2PLAN (OPTION 2) NTSH1PLAN (OPTION 1) NTS NOTE:CONSTRUCT SEDIMENT BARRIERAND CHANNELIZE RUNOFF TOSEDIMENT TRAPPING DEVICE

SEDIMENT TRAPPINGSUMPSEDIMENT TRAPPINGSUMPGRADE TO DRAINTO SUMP GRADE TO DRAINTO SUMP TAPER EDGESAT 1:1 SLOPE3% OR FLATTER3% OR FLATTER
10' MIN10' MIN
10' MIN1.5'DEEP 1.5'DEEP
NOTE:CONSTRUCT SEDIMENT BARRIERAND CHANNELIZE RUNOFF TOSEDIMENT TRAPPING DEVICE 30' MIN
50' MIN24' MIN
20' R MIN
10' MIN

SIGNAREAWASHOUTCONCRETE
60 MIL POLYETHYLENESTRAW BALES

SECTION A-ABALE CONFIGURATION
AA
NOTES:1.FACE SIGN TOWARD NEAREST STREET OR ACCESS POINT.2.CONCRETE WASHOUT SHALL BE LOCATED BEHIND THE CURB AND50 FEET MINIMUM FROM DRAINAGE INLETS OR WATERCOURSES.3.CONTRACTOR SHALL CONDUCT ALL CONCRETE WASHOUT OFF-SITE.ECONCRETE WASHOUT NTS 24" MIN36" MIN
14" MIN10' MIN
1"MIN
18"MIN18"MIN

STRAW BALES
THIS SECTION REMOVED FOR GRAPHICALREPRESENTATION ONLY. STRAW BALEPERIMETER SHALL BE CONTINUOUS.

ADJACENT ROLLS SHALLTIGHTLY ABUT (NOTE 1)8"-10" DIA.4" MIN (NOTE 2) STRAW WATTLE DIKE CONSTRUCTION SPECIFICATIONS:1.WATTLES SHALL BE PLACED IN A ROW WITH ENDS TIGHTLY ABUTTING.2.EACH WATTLE SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF 4 INCHES.3.WATTLES SHALL BE SECURELY ANCHORED IN PLACE BY TWO STAKES OR REBARS DRIVENTHROUGH THE WATTLES. THE FIRST STAKE IN EACH WATTLE SHALL BE DRIVEN TOWARD THEPREVIOUSLY LAID WATTLE TO FORCE THE WATTLES TOGETHER.4.THE DIKE SHALL BE INSPECTED AFTER EACH STORM, AND REPAIR OR REPLACEMENT SHALL BEMADE PROMPTLY AS NEEDED. THE WATTLES SHALL BE REMOVED ONCE THEY HAVE SERVEDTHEIR PURPOSE SO AS NOT TO BLOCK OR IMPEDE STORM FLOW OR DRAINAGE. (MAY SUBSTITUTE FOR SILT FENCEWITH APPROVAL OF CITY ENGINEER)

FSTRAW WATTLE DETAIL NTS
4' MAX SPACINGBETWEEN STAKES.1"x1" WOOD STAKE ORREBAR REQUIRED. (NOTE 3)

DUMP STRAPDUMP STRAP

SILTSACK OR EQUALLY APPROVED
1" REBAR FOR BAGREMOVAL FROM INLET
EXPANSION RESTRAINT(1/4" NYLON ROPE, 2"FLAT WASHERS)2 EACH DUMPSTRAP

DTYPICAL SILTSACK CONSTRUCTIONNTS

BAG DETAILINSTALLATION DETAIL
A
A
5'-0"MIN6'-0"MAX OPTIONAL MAINTENANCEOPENING (SEE DETAIL)SILT FENCE FABRICSEE END POST DETAILSILT FENCE FABRIC

SLOPETOE OF SLOPE SLOPE

WOOD POSTFENCE ANGLEDUP SLOPE(SEE NOTES)

SILT FENCE FABRICWOOD POSTBACKFILL
6"6"

STAPLEPANEL BWOOD POSTSPANEL ASILT FENCE FABRIC(SEE NOTES) G5TEMPORARY SILT FENCE NTS
G3TRENCH DETAIL - SECTIONNTSWOOD POSTSTAPLESILT FENCEFABRIC(SEE NOTES) G4END POST DETAILNTSG2POST AT JOINTS - PLANNTS
G1SECTION A-ANTS
2'-0"2'-6"1'-6"

WOOD POST

SLOPETOE OF SLOPESEE TRENCH DETAIL
3'-0" SETBACK(SEE NOTE 2)SILT FENCEFABRIC
TEMPORARY SILT FENCEDESIGN AND CONSTRUCTION SPECIFICATIONS:1.THE TEMPORARY SILT FENCE SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS OF LATEST EDITION OF THE CALIFORNIA STORMWATERHANDBOOK, DETAIL SE-1. WHERE THERE IS A DISCREPANCY BETWEEN THIS DETAIL AND THE CALIFORNIA STORMWATER HANDBOOK, THE HANDBOOK SHALL GOVERN.2.THE DOWN STREAM END OF THE TEMPORARY SILT FENCE SHALL HAVE THE LAST 8' ANGLED UP SLOPE.3.SETBACK DIMENSIONS MAY VARY TO FIT FIELD CONDITIONS.4.POSTS TO OVERLAP AND FENCE FABRIC TO FOLD AROUND EACH POST ONE FULL TURN. SECURE FABRIC WITH 4 STAPLES FOR EACH POST.5.POSTS SHALL BE DRIVEN TIGHTLY TOGETHER TO PREVENT POTENTIAL FLOW-THROUGH OF SEDIMENT AT THE JOINT. THE TOPS OF THE POSTS SHALL BE SECURED TO EACHOTHER WITH WIRE.6.FOR EACH END POST, FENCE FABRIC SHALL BE FOLDED AROUND TWO POSTS ONE FULL TURN AND SECURED WITH 4 STAPLES.7.MINIMUM OF 4 STAPLES SHALL BE INSTALLED PER POST. DIMENSIONS SHOWN ARE TYPICAL.8.MAINTENANCE OPENINGS SHALL BE CONSTRUCTED IN A MANNER TO ENSURE THAT SEDIMENT IS RETAINED BY THE TEMPORARY SILT FENCE.9.JOINT SECTIONS SHALL NOT BE PLACED AT SUMP LOCATIONS. 2" X 2" STAKES OR #4J-BARS 2 PER BALE (TYP)

1.THESE PLANS DEPICT APPROPRIATE MEASURES TO CONTROL EROSION ON THE SITE TO BE GRADED ASSHOWN ON THE PLANS THE NATIVE VEGETATION WILL BE REMOVED ONLY FROM THOSE AREAS TO BEGRADED. AREAS OUTSIDE OF AND DOWNSLOPE OF THE LIMITS OF GRADING WILL BE PROTECTED FROMSILT LADEN RUNOFF BY PERIMETER SILT FENCES AS DEPICTED ON THIS PLAN. SLOPED AREAS WHICH HAVEBEEN STRIPPED OF VEGETATION AND NEW SLOPES OVER FOUR FEET HIGH CREATED DURING THE GRADINGOPERATION WILL BE TRACKWALKED & HYDROSEEDED.2.ALL EROSION SEDIMENT STRUCTURES SHALL BE INSPECTED AFTER EACH RAINSTORM AND SHALL BECLEANED OUT AS NECESSARY.3.A STABILIZED CONSTRUCTION ENTRANCE SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING.THE LOCATION SHALL BE DETERMINED IN THE FIELD BY THE CONTRACTOR. ALL CONSTRUCTION TRAFFICENTERING THE PAVED ROAD MUST CROSS THE ENTRANCE.4.THE CONTRACTOR IS RESPONSIBLE FOR ALL ASPECTS OF EROSION CONTROL FOR THE LIFE OF THEPROJECT AND SHALL INSTALL AND MAINTAIN ANY DEVICES AND MEASURES NECESSARY TO THESATISFACTION OF THE CITY ENGINEER, DURING CONSTRUCTION ACTIVITIES.5.TO MINIMIZE EROSION OF GRADED BANKS, ALL GRADED BANKS AND STOCKPILE AREAS SHALL BEHYDROSEEDED, LANDSCAPED OR SEALED.6.STRAW BALES, PIECES OF WOOD, FABRIC OR OTHER SUITABLE MATERIALS SHALL BE USED TO PREVENTSEDIMENT LADEN RUNOFF FROM ENTERING ANY COMPLETED STORM DRAIN INLETS. THESE PROTECTIONMEASURES SHALL BE MAINTAINED UNTIL THE PROJECT IS COMPLETED.7.WHEN TEMPORARY STRUCTURES HAVE SERVED THEIR INTENDED PURPOSE AND THE CONTRIBUTINGDRAINAGE AREA HAS BEEN PROPERLY STABILIZED. THE EMBANKMENT AND RESULTING SEDIMENTDEPOSITS ARE TO BE LEVELED OR OTHERWISE DISPOSED OF BY THE CONTRACTOR AS RECOMMENDED BYTHE SOILS ENGINEER.8.GRADED AREAS MUST DRAIN AWAY FROM THE FACE OF SLOPES AT THE CONCLUSION OF EACH WORKINGDAY. DRAINAGE SHALL BE DIRECTED TOWARDS DRAINAGE INLETS.9.TEMPORARY EROSION CONTROL DEVICES SHOWN ON THIS PLAN WHICH INTERFERE WITH THE WORK SHALLBE RELOCATED OR MODIFIED AS AND WHEN THE INSPECTOR SO DIRECTS AS THE WORK PROGRESSES.10.ALL LOOSE SOIL AND DEBRIS SHALL BE REMOVED FROM THE STREET AREAS UPON STARTING OPERATIONSAND PERIODICALLY THEREAFTER AS DIRECTED BY THE INSPECTOR.11.HYDROMULCHING OF SLOPES OVER 5' IN HEIGHT SHALL BE COMPLETED BETWEEN SEPTEMBER 1 ANDOCTOBER 1 OF THE YEAR IN WHICH THEY ARE CONSTRUCTED OR IMMEDIATELY AFTER THEIRCONSTRUCTION IF THEY ARE COMPLETED AFTER OCTOBER 1ST. APPLICATION RATES SHALL BE ASFOLLOWS:HYDROSEED MIX:BOTANICAL NAME(COMMON NAME)MIN. % PURITYMIN. % GERMINATION LB/ACREARISTIDA TERNIPES VAR.HAMULOSA(THREE-AWN)90%85%2BROMUS CARINATUS(CALIFORNIA BROME)90%85%2ELYMUS GLAUCUS(BLUE WILD RYE)90%85%4ELYMUS TRACHYCAULUS SSP.TRACHYCAULUS(SLENDER WHEATGRASS)90%85%3MELICA CALIFORNICA(CALIFORNIA ONION GRASS)90%85%2MUHLENBERGIA RIGENS(DEER GRASS)90%85%4NASSELLA LEPIDA(FOOTHILL NEEDLEGRASS)90%85%6TRIFOLIUM HIRTUM('HYKON' ROSE CLOVER)90%85%10CELLULOSE FIBER MULCH2000ORGANIC BINDER WITH HYDROSEED SLURRY5016-20-O-S FERTILIZER30012.WHEN DIRECTED BY THE INSPECTOR, A 12-INCH BERM SHALL BE MAINTAINED ALONG THE TOP OF THESLOPE OF THOSE FILLS ON WHICH GRADING IS NOT IN PROGRESS.13.STAND-BY CREWS SHALL BE ALERTED BY THE PERMITTEE OR CONTRACTOR FOR EMERGENCY WORKDURING RAINSTORMS.14.SEWER OR STORM DRAIN TRENCHES THAT DRAIN THROUGH BASIN DIKES SHALL BE PLUGGED WITHSANDBAGS FROM TOP OF PIPE TO TOP OF DIKE.15.ALL UTILITY TRENCHES SHALL BE BLOCKED WHEN DIRECTED BY THE DESIGN ENGINEER AT THEPRESCRIBED INTERVALS FROM THE BOTTOM TO TOP WITH DOUBLE ROW OF SANDBAGS PRIOR TO BACKFILL.SANDBAGS ARE TO BE PLACED WITH ALTERNATE HEADER AND STRETCHER COURSES. THE INTERVALSPRESCRIBED BETWEEN SANDBAG BLOCKING SHALL DEPEND ON THE SLOPE OF THE GROUND SURFACE,BUT NOT TO EXCEED THE FOLLOWING:GRADE OF GROUND SURFACE OR STREETINTERVALLESS THAN 2%AS REQUIRED2% TO 4%100 FEET4% TO 10%50 FEETOVER 10%25 FEET16.PROVIDE VELOCITY CHECK DAMS IN ALL UNPAVED STREET AREAS AT THE INTERVALS INDICATED ABOVE.VELOCITY CHECK DAMS MAY BE CONSTRUCTED OF SANDBAGS, TIMBER, OR OTHER EROSION RESISTANTMATERIALS APPROVED BY THE INSPECTOR, AND SHALL EXTEND COMPLETELY ACROSS THE STREET ORCHANNEL AT RIGHT ANGLES TO THE CENTERLINE. EARTH DIKES MAY NOT BE USED AS VELOCITY CHECKDAMS.17.AFTER SEWER AND UTILITY TRENCHES ARE BACKFILLED AND COMPACTED, THE SURFACES OVER SUCHTRENCHES SHALL BE MOUNDED SLIGHTLY TO PREVENT CHANNELING OF WATER IN THE TRENCH AREA.CARE SHOULD BE EXERCISED TO PROVIDE FOR CROSS-FLOW AT FREQUENT INTERVALS WHERE TRENCHESARE NOT ON THE CENTERLINE OF A CROWNED STREET. REMOVE ALL CHECK DAMS PRIOR TO BACKFILL.18.EXCEPT AS OTHERWISE DIRECTED BY THE INSPECTOR, ALL DEVICES SHOWN SHALL BE IN PLACE AT THEEND OF EACH WORKING DAY OR WHEN DIRECTED BY THE INSPECTOR.19.ALL BASINS AND CHECK DAMS SHALL HAVE BEEN PUMPED DRY, AND ALL DEBRIS AND SILT REMOVEDWITHIN 24 HOURS AFTER EACH STORM.20.SANDBAGS SHALL BE STOCKPILED ON-SITE, READY TO BE PLACED IN POSITION WHEN THE CHANCE OF RAINIS FORECAST TO BE 40% OR GREATER.21.EXPOSED SLOPES SHALL BE PROTECTED BY VEGETATION COVER OR FABRIC COVER AS APPROVED BY THECITY ENGINEER.22.ALL EROSION CONTROL MEASURES SHALL BE IN COMPLIANCE WITH THE LATEST EDITION OF THE CASQASTORMWATER MANAGEMENT HANDBOOK.23.THE FOLLOWING PLANS ARE ACCURATE FOR EROSION CONTROL PURPOSES ONLY.24.THE INFORMATION ON THIS PLAN IS INTENDED TO BE USED AS A GUIDELINE FOR THE CONTRACTOR ANDSUBCONTRACTORS TO COMPLY WITH THE REQUIREMENTS OF THE STATE WATER RESOURCES CONTROLBOARD. FIELD CONDITIONS MAY NECESSITATE MODIFICATIONS TO THIS PLAN.25.NO ONSITE FUELING SHALL TAKE PLACE.26.SEAL OR SKIRT BETWEEN TRAILER & GRADING TO PREVENT EXPOSURE TO DRAIN.27.STRAW WATTLES INSTALLED ON A SLOPE SHALL CONFORM TO THE GUIDELINES SPECIFIED BY THE UNITEDSTATES ENVIRONMENTAL PROTECTION AGENCY NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEMBEST MANAGEMENT PRACTICES.28.EROSION RESISTANT VEGETATION SHOULD BE MAINTAINED ON THE FACE OF ALL SLOPES.29.A STATE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) CONSTRUCTION PERMIT NOTICEOF INTENT (NOI) SHALL BE FILED WITH THE STATE WATER RESOURCES CONTROL BOARD.30.IMPLEMENTATION OF THE RECOMMENDED EROSION CONTROL MEASURES AS SHOWN ON THESE PLANSDOES NOT ENSURE COMPLIANCE WITH FEDERAL, STATE, AND LOCAL LAWS, REGULATIONS, ANDORDINANCES. THE BURDEN OF COMPLIANCE RESTS SOLELY WITH THE OWNER AND DEVELOPER OF THEPROJECT.

EROSION CONTROL NOTES

APPROVED
SHEETNUMBER DATEDESCRIPTIONSREVISIONSNO.

CALIFORNIA
JOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:

PLOTTED: 06/30/2025 12:31 PLOTTED BY: TtophamDWGNAME: F:\23-3406 City of Merced Canal St & Childs Ave Project\Civil\Imp Plans\C7.2 ERS.dwg C7.2COPYRIGHT © 2025 NORTHSTAR ENGINEERING GROUP, INC 23-3406CVVCVVTT06/30/2025

MERCED,CANAL STREET AND CHILDS AVENUECIVIL IMPROVEMENT PLANS FOR PRELIMINARY:NOT FORCONSTRUCTION

ITEM ITEM UNIT OF ESTIMATED UNIT PRICE TOTAL
NO. MEASURE QUANTITIES (IN $) (IN $)
1 Permits, Bonds, Licenses, & Insurance LS 1 20,000.00 $ 20,000.00 $ 2 Public Convenience & Safety LS 1 42,000.00 $ 42,000.00 $ 3 Water Pollution Control LS 1 20,000.00 $ 20,000.00 $ 4 Street Sweeping LS 1 3,500.00 $ 3,500.00 $
5 Surveying Services LS 1 8,500.00 $ 8,500.00 $ 6 Monumentation LS 5 1,200.00 $ 6,000.00 $
7 Clear & Grubing LS 1 45,000.00 $ 45,000.00 $
8 Remove Existing Pavement SF 21,147 8.00 $ 169,176.00 $ 9 Remove Curb & Gutter LF 170 25.00 $ 4,250.00 $ 10 Remove Existing Concrete SF 2,029 4.00 $ 8,116.00 $ 11 Remove Existing Sign EA 6 300.00 $ 1,800.00 $ 12 Asphalt 5"AC/13"AB SF 7,400 30.00 $ 222,000.00 $ 13 Asphalt 2.5"AC/6"AB SF 5,031 20.00 $ 100,620.00 $ 14 Install 5' Sidewalks SF 10,477 25.00 $ 261,925.00 $ 15 Install Curb & Gutter LF 2,029 80.00 $ 162,320.00 $ 16 Install Access Ramps EA 3 8,000.00 $ 24,000.00 $ 17 Construct Driveway (Residential) EA 4 8,000.00 $ 32,000.00 $ 18 Construct Driveway (Commercial) EA 5 12,000.00 $ 60,000.00 $ 19 Install Streetlights EA 8 32,000.00 $ 256,000.00 $ 20 Connect to power LS 1 25,000.00 $ 25,000.00 $
21 Install Catch Basins EA 5 9,000.00 $ 45,000.00 $ 22 Install 18" HDPE Storm Drain LF 1,204 110.00 $ 132,440.00 $ 23 Install 12" HDPE Storm Drain LF 110 120.00 $ 13,200.00 $ 24 Raise Utilites to grade EA 12 1,500.00 $ 18,000.00 $ 25 Remove Tree EA 2 2,000.00 $ 4,000.00 $
26 Restoration LS 1 25,000.00 $ 25,000.00 $
1,709,847.00 $
(15%) Contingencies 256,477.05 $
(5%) Inspection/Testing 85,492.35 $
(5%) Engineer Administration 85,492.35 $
Total 2,051,816.40 $
Items 1 through 26
Preliminary Engineers Estimate
CMAQ Childs Ave & Canal Street
City of Merced
Pedestrian Facility
CMAQ $ $951,817
LIFE 15 years
Days (D) 365 days/year
Avg. Length (L) of Bike Trip 1 miles 1-dir./trip
Annual Avg. Daily Traffic (ADT) 13,200 trips/day 2-dir. traffic volumes on roadway parrallel to bike project
Adjust. (A) on ADT for auto 0.0073
trips replaced by bike trips
Credit (C) for Activity Centers 0.003
near the bike project
Annual Auto Trips Reduced
AATR = D x ADT x (A + C) 49,625 trips/year
Annual Auto VMT Reduced
AAVMTR = AATR x L 49,625 miles/year
EMISSION FACTOR INPUTS FOR AUTO TRAVEL: Table 3: Avg. Auto Emission Factors (Feb. 2024) Bike Lanes: 15-Year Life
Feb., 2024
ROG 0.461 g/trip 0.051 g/mi
NOx 0.275 g/trip 0.056 g/mi
PM2.5 0.002 g/trip 0.034 g/mi
PM10 0.013 g/trip 0.227 g/mi
Capital Recovery Factor (CRF) , where I = 3%
CRF = [(1 + i)^n x (i)] / [(1 + i)^n - 1] n = 15 LIFE
(1 + i)^n = 1.5580
CRF = 0.0838
Annual Emission Reductions ER Bike Lanes: 15-Year Life
(ROG + NOx + PM2.5 + PM10) = (AATR x AUTO TEF) + (AAVMT x AUTO VMT) / 454 Note: 1 pound = approx. 454 grams

55.97 ER (ROG) lbs/year > kg/day 0.07

36.18 ER (NOx) lbs/year > kg/day 0.05

3.94 ER (PM2.5) lbs/year > kg/day 0.00

26.23 ER (PM10) lbs/year > kg/day 0.03
122.31 ER-Total lbs/year > kg/day 0.15
Cost-Effectiveness of Funding
CEF = (CRF x Funding) / (ROG + NOx + PM2.5)
Cost-Effectiveness of Funding (CEF)
651.85$ $ / lb. emissions CMAQ: Air Pollution Reductions (kg/day) = (lbs./year) / (2.2 x 365)

0.15 kg/day
Annual Auto VMT Reduced
AAVMTR = AATR x L 49,625 miles/year
Auto Vehicle Emission Factor, AVEF (grams of CO2e per mile) 411 EPA
20,396 kg CO2e

AUTO TEF AUTO VMT

PH: 209.723.3153
FAX: 209.723.0322
www.mcagov.org
369 W. 18th Street
Merced, CA 95340

P a r t n e r i n g f o r R e g i o n a l S o l u t i o n s April 3, 2024

The Honorable John Duarte
1535 Longworth House Office Building
Washington, DC 20515

Subject: Childs and Canal Roadway Construction Project in South Merced

Dear Congressman Duarte,

The Merced County Association of Governments is writing to express support for the City of Merced's proposed Childs and Canal Roadway Construction Project and urge your consideration of their funding request for $3 million.

The Childs and Canal Roadway Construction Project is a vital initiative to address critical infrastructure needs and foster sustainable development in South Merced, where food insecurity and transportation infrastructure deficiencies persist, exacerbating existing socio-economic disparities. As you may know, South Merced is classified as a food desert, severely limiting residents' access to fresh and nutritious food options. This lack of access underscores the urgency of this project, which aims to improve transportation infrastructure and facilitate the development of a much-needed shopping plaza featuring a grocery store. By providing convenient access to essential dietary staples within the community, this reconstruction project will significantly enhance the quality of life for South Merced residents and mitigate the adverse effects of food insecurity.

The infrastructure improvements included in this project will create safer routes for pedestrians, particularly children and families, to access local parks, schools, and neighborhoods, thus underscoring its commitment to prioritizing the well-being and safety of all residents. Moreover, the Childs and Canal Roadway Construction Project aligns with federal priorities by promoting sustainable growth and addressing environmental concerns, adhering to the City's Sustainable Development Plan and the South Merced Strategic Plan, seeking to create a vibrant and resilient community that caters to the needs of current and future generations.

The project's potential to attract developers, drawn by the prospect of infrastructure improvements and economic opportunities, further highlights its importance in enhancing the community's long-term prospects for success and prosperity. Please consider this project's federal nexus and support the City of Merced's funding request for $3 million. Your assistance will address pressing infrastructure needs and contribute to the long-term prosperity of not only CA-13 but also the state of California as a whole.

If you require any further information or assistance regarding this project, please do not hesitate to contact City Manager Scott McBride.

Sincerely,

Stacie Guzman
Executive Director

DocuSign Envelope ID: 94B925C1-C357-4BD9-8508-B0FB441660E9

PH: 209.723.3153
FAX: 209.723.0322
www.mcagov.org
369 W. 18th Street
Merced, CA 95340
P a r t n e r i n g f o r R e g i o n a l S o l u t i o n s March 31, 2025
The Honorable Adam Gray
U.S. House of Representatives
1230 Longworth House Office Building
Washington, DC 20515
Subject: Letter of Support – Childs and Canal Roadway Construction Project Dear Representative Gray,
On behalf of Merced County Association of Governments, I am writing to express strong support for the City of Merced’s federal budget request for the Childs and Canal Roadway Construction Project.

This initiative is a critical investment in South Merced, aimed at improving pedestrian safety, enhancing storm drainage, and supporting long-overdue economic revitalization. The project will provide safe access to a much-needed grocery store, addressing food insecurity in an area designated as a food desert.

The City of Merced is seeking $3 million in federal funding to complete the project, which includes reconstructing 2,000 feet of roadway, installing sidewalks, curbs, gutters, streetlights, and pedestrian crossings, as well as improving stormwater infrastructure. These improvements are essential to creating safer routes for families, schoolchildren, and residents who rely on walkable access to local amenities. Moreover, this project aligns with federal priorities for sustainable growth, safety, and economic development.

Beyond infrastructure improvements, the project serves as a catalyst for broader community revitalization. With enhanced accessibility and safety, it paves the way for future development, bringing job opportunities and long-term economic stability to the area. The Childs and Canal Roadway Construction Project is more than a roadway upgrade—it is a necessary step in ensuring South Merced residents have access to essential resources and a higher quality of life.

We urge your support in securing this critical funding and appreciate your consideration of this request. If you require any additional information, please do not hesitate to reach out.

Sincerely,
Stacie Guzman
Executive Director

C I T Y O F M E R C E D
6 7 8 W e s t 18 t h S t r e e t, M e r c e d, C A 9 5 3 4 0

Project Title: Childs and Canal Roadway Construction Project in South Merced, California

Applicant/Recipient Name: Scott McBride
City Manager
City of Merced
678 W. 18th Street
Merced, CA 95340

Funding Level Requested: $3 Million

Bill & Account: Transportation, Housing, and Urban Development DOT, Transit Infrastructure Projects

Brief Description: The City of Merced's $3 million federal budget request supports the transformative Childs and Canal Roadway Construction Project. This project addresses food insecurity in South Merced by enhancing transportation infrastructure and facilitating the development of a grocery store. This initiative prioritizes safety, aligns with federal priorities for sustainable growth, and promises economic development, ensuring a brighter future for South Merced and its residents.

Detailed Description: The Childs and Canal Roadway Construction Project is a transformative endeavor aimed at boosting transportation infrastructure and comb ating the prevalent issue of food insecurity within South Merced, a community burdened by its designation as a food desert. Residents in this area face significant challenges in accessing fresh produce, often needing to travel considerable distances—exceeding a mile—to reach a grocery store outside their low-income census tract. This limited access to essential dietary staples exacerbates existing socio-economic inequalities, rendering South Merced more disadvantaged than other parts of Merced.

Central to the project's objectives is reconstructing 2000 feet of roadway, complemented by critical amenities such as curbs, gutters, stormwater systems, sidewalks, access ramps, bike paths, streetlights, and controlled pedestrian street crossings. This comprehensive approach aims to enhance transportation infrastructure and lays the groundwork for developing a much-needed shopping plaza featuring a grocery store. This development addresses the critical food desert issue plaguing South Merced by providing convenient access to fresh and nutritious food options within their community.

The infrastructure improvements promise to establish safer routes for families

C I T Y O F M E R C E D
6 7 8 W e s t 18 t h S t r e e t, M e r c e d, C A 9 5 3 4 0

and children commuting to and from local parks, elementary schools, and surrounding neighborhoods. Prioritizing the well-being and safety of residents, particularly vulnerable populations such as children and pedestrians, underscores the project's commitment to fostering a secure living environment.

The project's alignment with federal priorities is evident in its focus on promoting sustainable growth and addressing environmental concerns, by adhering to the City's Sustainable Development Plan and the South Merced Strategic Plan, the initiative endeavors to cultivate a vibrant and resilient community that caters to the needs of both current and future generations.

Support from local stakeholders, including community development organizations and residents, underscores the project's significance as a pivotal step toward revitalizing South Merced. Furthermore, the potential for developers to invest in the area, attracted by the prospect of infrastructure improvements and the development of the shopping plaza, holds promise in bringing additional jobs and economic opportunities to the community, thereby augmenting its prospects for long-term success and prosperity.

In essence, the Childs and Canal Roadway Construction Project represents a n integrated approach to enhancing transportation infrastructure, promoting economic development, and improving South M erced's overall quality of life.

With a budget of $3.5 million, supplemented by $395,768 allocated from Local Transportation Funds (LTF) by the City Council, the project is currently in the design phase, with construction scheduled to commence in the fall of 2024.

Federal Funding Use: Requested federal funding will play a pivotal role in covering the remaining costs of the Childs and Canal Roadway Construction Project, particularly during the construction phase. These funds will be instrumental in implementing critical infrastructure improvements essential for enhancing accessibility and safety within the community.

Local and Regional Need: The Childs and Canal Roadway Construction Project is necessary to address pressing local and regional concer ns. Beyond mitigating food insecurity and transportation challenges, the project holds the potential to stimulate economic development within South Merced and surrounding areas. By attracting developers to invest in the region, the project can create job o pportunities and foster long -term prosperity in alignment with local Sustainable Development and Strategic Plans.

Federal Nexus: The project strongly aligns with federal infrastructure investment and community development priorities, establishing a clear federal nexus. By addressing critical infrastructure needs and promoting sustainable growth, the

C I T Y O F M E R C E D
6 7 8 W e s t 18 t h S t r e e t, M e r c e d, C A 9 5 3 4 0

project contributes significantly to the long -term prosperity of CA -13 and California. Therefore, seeking federal funding support is imperative to bridge the financial gap and ensure the successful realization of this transformative initiative, which holds the promise of revitalizing South Merced and enhancing its residents' overall quality of life.

We appreciate your consideration of this funding request. If you have questions or need additional information, please get in touch with City Manager Scott McBride.

Sincerely,

Matthew Serratto
Mayor
City of Merced

C I T Y O F M E R C E D
6 7 8 W e s t 18 t h S t r e e t, M e r c e d, C A 9 5 3 4 0

Project Title: Childs and Canal Roadway Construction Project in South Merced, California

Applicant/Recipient Name: Scott McBride
City Manager
City of Merced
678 W. 18
th Street
Merced, CA 95340

Funding Level Requested: $3 Million

Bill & Account: Transportation, Housing, and Urban Development DOT, Transit Infrastructure Projects

Brief Description: Dear Congressman Gray,

I am reaching out regarding the City of Merced’s federal budget request for the Childs and Canal Roadway Construction Project, a critical infrastructure initiative focused on improving pedestrian safety, enhancing storm drainage, and supporting economic revitalization in South Merced. This project is essential to providing safe access to a long -awaited grocery store and fostering development in the community. We are seeking $3 million in funding to ensure its successful completion.

Given the urgency and transformative impact of this project, we respectfully request your support in securing the remaining funds and clarifying the status of the previously approved allocation. This initiative directly aligns with federal priorities for sustainable growth, safety, and economic development, and we are eager to move forward in ensuring South Merced res idents have access to essential resources, including a long-awaited grocery store.

Detailed Description: The Childs and Canal Roadway Construction Project is a transformative effort aimed at boosting transportation infrastructure and combating the prevalent issue of food insecurity within South Merced, a community burdened by its designation as a food desert. Residents in this area face significant challenges in accessing fresh produce , often needing to travel considerable distances — exceeding a mile —to reach a grocery store outside their low -income census tract. This limited access to essential dietary staples exacerbates existing socio- economic inequalities, rendering South Merced more disadvantaged than other parts of Merced.

Central to the project's objectives is reconstructing 2000 feet of roadway, complemented by critical amenities such as curbs, gutters, stormwater systems,

C I T Y O F M E R C E D
6 7 8 W e s t 18 t h S t r e e t, M e r c e d, C A 9 5 3 4 0

sidewalks, access ramps, bike paths, streetlights, and controlled pedestrian street crossings. This comprehensive approach aims to enhance transportation infrastructure and lays the groundwork for developing a much-needed shopping plaza featuring a grocery store. This development addresses the critical food desert issue plaguing South Merced by providing convenient access to fresh and nutritious food options within their community.

The infrastructure improvements promise to establish safer routes for families and children commuting to and from local parks, elementary schools, and surrounding neighborhoods. Prioritizing the well-being and safety of residents, particularly vulnerable po pulations such as children and pedestrians, underscores the project's commitment to fostering a secure living environment.

The project's alignment with federal priorities is evident in its focus on promoting sustainable growth and addressing environmental concerns, by adhering to the City's Sustainable Development Plan and the South Merced Strategic Plan, the initiative endeavors to cultivate a vibrant and resilient community that caters to the needs of both current and future generations.

Support from local stakeholders, including community development organizations and residents, underscores the project's significance as a pivotal step toward revitalizing South Merced. Furthermore, the potential for developers to invest in the area, attracted by the prospect of infrastructure improvements and the development of the shopping plaza, holds promise in bringing additional jobs and economic opportunities to the community, thereby augmenting its prospects for long-term success and prosperity.

The Childs and Canal Roadway Construction Project is a comprehensive effort to improve transportation infrastructure, drive economic development, and enhance the quality of life in South Merced. The design phase is now complete, and with a total budget of $3.5 million —supplemented by $545,433 in Local Transportation Funds (LTF) allocated by the City Council—construction is ready to begin. However, the project’s start date is contingent on securing the necessary funding.

Federal Funding Use: Requested federal funding will play a pivotal role in covering the remaining costs of the Childs and Canal Roadway Construction Project, particularly during the construction phase. These funds will be instrumental in implementing critical infrastructure im provements essential for enhancing accessibility and safety within the community.

C I T Y O F M E R C E D
6 7 8 W e s t 18 t h S t r e e t, M e r c e d, C A 9 5 3 4 0

Local and Regional Need: The Childs and Canal Roadway Construction Project is necessary to address pressing local and regional concerns. Beyond mitigating food insecurity and transportation challenges, the project holds the potential to stimulate economic development within South Merced and surrounding areas. By attracting developers to invest in the region, the project can create job opportunities and foster long -term prosperity in alignment with local Sustainable Development and Strategic Plans.

Federal Nexus: The project strongly aligns with federal infrastructure investment and community development priorities, establishing a clear federal nexus. By addressing critical infrastructure needs and promoting sustainable growth, the project contributes significantly to the long -term prosperity of CA -13 and California. Therefore, seeking federal funding support is imperative to bridge the financial gap and ensure the successful realization of this transformative initiative, which holds the promise of revitalizing South Merced and enhancing its residents' overall quality of life.

We appreciate your consideration of this funding request. If you have questions or need additional information, please get in touch with City Manager Scott McBride.

Sincerely,

Matthew Serratto
Mayor
City of Merced