Stockbridge General Contracting’s Construction Contract

City Council/Public Finance and Economic Development Authority/Parking Authority
May 4, 2026

Document
Stockbridge General Contracting’s Construction Contract
Meeting
May 4, 2026
Body
City Council/Public Finance and Economic Development Authority/Parking Authority
Pages
412
Original file
89.0 MB
Text extracted from the city's file for reading and search. Open the original on cityofmerced.legistar1.com. That file is the official record.

General Vang Pao Park Section 01570
February 2026 Environmental Protection
01570 - 2

2. Section 02905 – Landscape Installation

1.03 REFERENCES
A. The following publications form a part of this specification to the extent referenced.

1. The City has obtained the following environmental documents/references and permits:
a. CEQA — California Environmental Quality Act of 1970:
1) ND — Negative Declaration.
2) Notice of Determination.

1.04 SUBMITTALS
A. The Contractor shall develop and submit five detailed plans for implementing the requirements of this section. The plans shall include but not be limited to the following:

1. Name of Contractor's supervisor responsible for implementing the plans.

2. Working drawings and data for implementing the requirements of the plans.

3. Air Quality Control Plan.

4. Water Quality Control Plan and Storm Water Pollution Prevention Plan (SWPPP) (Update existing SWPPP on file with the City).
a. The Storm Water Pollution Prevention Plan (SWPPP) shall be submitted to the Regional Water Quality Control Board (RWQCB) prior to demolition work begins. The SWPPP must be approved by the RWQCB prior to the start of demolition activities.

5. Fire Prevention and Control Plan.

6. Noise Control Plan.

7. Traffic Control Plan.

B. The Contractor shall submit the above plans including working drawings and data to the City for approval five (5) working days prior to mobilization.

C. Copies of all of the above plans shall be maintained at the work site throughout the construction period.

Page 96 of 412 ends

General Vang Pao Park Section 01570
February 2026 Environmental Protection
01570 - 3

1.05 DELIVERY, STORAGE, AND HANDLING OF HAZARDOUS MATERIALS A. Construction Sites and Equipment:

1. The storage, transportation, transfer, containment, and disposal of hazardous materials, such as fuel, oil, and lubricants have potential for affecting water quality.

Fuel, oil and other petroleum products shall be stored only at designated sites. The use of hazardous materials shall be avoided or minimized where possible. Each hazardous material containment container shall be clearly labeled with its identity, handling and safety instructions, and emergency contact. Similar information shall be clearly available and visible in the storage areas. Storage and transfer of such materials shall not be allowed within 100 feet of streams or sites known to contain sensitive biological resources. Storage or use of hazardous materials in or near wet or dry streams shall be consistent with the Fish and Game Code and other State laws. Material Safety Data Sheets (MSDS) shall be made readily available to the Contractor's employees and other personnel at the work site. The accumulation and temporary storage of hazardous wastes shall not exceed 90 days. Soils contaminated by spills or cleaning wastes shall be contained and shall be removed to an approved disposal site. Disposal of hazardous wastes shall be in compliance with all applicable laws and regulations.

2. Petroleum drippings on equipment have potential to result in water pollution during construction. The Contractor shall maintain construction equipment to minimize petroleum drippings. All stationary power equipment such as engines, pumps, generators, welders, and air compressors shall be positioned over drip pans. Equipment used in water shall be free of exterior petroleum products prior to submersion, and shall be checked and maintained daily to keep the equipment exteriors clean.

3. Petroleum products shall be stored in nonleaking containers at impervious storage sites from which runoff is not permitted to escape.

4. Personnel stationed at or near these sites shall be trained in emergency response and spill containment techniques. An ample supply of absorbent pads, pillows, socks, booms, and other spill containment materials shall be maintained at the hazardous materials storage sites for use in the event of spills. Contaminated absorbent pads, pillows, socks, booms, and other spill containment materials shall be placed in nonleaking sealed container until transport to an appropriate disposal facility. The Contractor shall furnish to the Engineer a contact person and telephony number of a company experienced in emergency response for vacuuming and containing spills of oil or other petroleum products.

5. Fuel may be transferred from the storage areas to construction equipment by tanker trucks. Fuel transfers shall take place at least 100 feet from exclusion zones, drainage areas, water bodies and streams.

6. Fuel transfer vehicles shall have absorbent pads, pillows, socks, booms or other spill containment materials placed under the fueling operation (between the fuel

Page 97 of 412 ends

General Vang Pao Park Section 01570
February 2026 Environmental Protection
01570 - 4
truck and the equipment being serviced). A trained service attendant shall monitor the filling of equipment and shall stop the fuel flow immediately if any spill occurs. Fuel transfer shall not resume until the problem is resolved to the satisfaction of the Engineer. The service attendant shall be trained in emergency response, fire extinguisher use, and spill containment techniques.

1.06 SENSITIVE SPECIES - NOT USED

1.07 COLLECTION AND HARASSMENT OF SPECIES
A. No intentional harassment, killing, or collection of plants or animals at or around the work site will be allowed.

1.08 BOUNDARIES OF WORK SITE AND LISTED SENSITIVE SPECIES A. The boundaries of the work site is as shown on the construction drawings for showing exact location of work and areas that may be occupied by the Contractor. The Contractor and the Contractor's employees shall not leave the right of way or temporary construction easement, without prior written approval.

B. Preconstruction surveys will be conducted to designate exclusion zones.

C. Exclusion zones will be marked with either large flagged stakes connected by cord, or survey laths or wooden stakes prominently flagged with survey ribbon or fencing. The Contractor and Contractor's employees shall not encroach into flagged exclusion zones in any manner, whether in vehicles or on foot, without prior written approval.

D. No pets, camping, firearms, or any other use of the right of way area will be allowed.

Harassment, killing, or destruction of dens or burrows of wildlife species is strictly prohibited. Contractor's employees shall not be allowed at the work site during nonworking hours. Only authorized camping areas may be utilized. Exceptions that will not cause environmental impacts to biological resources may be allowed by the Engineer.

E. Food-related trash, such as wrappers, cans, bottles, and scraps shall be placed in closed containers and removed daily from work sites. All trash or garbage shall be removed to a City-approved disposal site at least weekly by the Contractor. The right of way shall be policed daily by Contractor's personnel and monitored by inspectors or environmental personnel.

F. Traffic shall be restricted to existing roads and flagged right of way or temporary construction easement. Construction related vehicles shall not exceed 25 mph on straight and level roads, with a 10-mph speed limit in areas of steepness or with curves.

Page 98 of 412 ends

General Vang Pao Park Section 01570
February 2026 Environmental Protection
01570 - 5

1.09 BIOLOGICAL RESOURCES (PLANTS AND ANIMALS)
A. The Construction activities have potential for affecting the biological resources by physical destruction, disturbance, and/or displacement.

B. The Contractor shall not be permitted in areas where sensitive plant species occur until the sensitive plants are removed or soil seed banks are removed by the City.

C. Unless otherwise approved, the Contractor shall not apply any rodenticide or herbicide to control any vertebrate or plant pest.

1.10 CULTURAL RESOURCES
A. See also Special Provisions
B. The construction activities have potential for affecting cultural resources such as historically significant resources, local land uses, commercial establishments, or the activities of local landowners, residents, or recreationalists.

C. The Contractor shall reduce potential adverse impacts to cultural resources that may be associated with construction by implementing the preservation of culturally significant resources in accordance with the National Historic Preservation Act of 1966, (16 U.S.C.470).

D. If any potential paleontological, archaeological or historic sites are uncovered, the Owners Representative will be notified prior to proceeding with the work affected. If necessary the Engineer will suspend work as specified in the General Conditions. The Owners Representative will provide for an initial field evaluation of the site within seventy-two (72) hours after receiving notification of Contractor's discovery.

E.If human remains are exposed, all construction activities shall be halted in the immediate vicinity until the County Coroner has assessed the remains.

1.11 AIR QUALITY CONTROL PLAN
A. See also Special Provisions.

B. The construction activities have potential for resulting in localized, short-term construction emissions from stationary, mobile and area sources, and fugitive dust from construction equipment, and trucks for hauling.

C. The Contractor shall reduce these effects by submitting and implementing an Air Quality Control Plan. The following components, if applicable, shall be included in the plan and if not applicable the Contractor shall explain in the plan why that component or portions thereof is not included in the plan.

Page 99 of 412 ends

General Vang Pao Park Section 01570
February 2026 Environmental Protection
01570 - 6
D. Fugitive dust shall be minimized by watering, minimizing cleared areas, covering exposed surfaces, seeding, managing activities to keep the active work area small at any given time, applying chemical suppressant or implementing other dust control measures as approved. One or more of the above control measures shall be used sufficiently to prevent fugitive dust from leaving the work site. Increased application of control measures shall be required whenever conditions cause fugitive dust.

E. The Contractor shall control fugitive dust by:

1. Minimizing areas cleared to facilitate construction, such as storage areas, staging areas, stockpile areas and vehicle parking.

2. Covering spoil piles when necessary.

3. Constructing roadways, driveways, sidewalks, building pads and other graded surfaces.

4. Chipping cleared vegetation and covering exposed areas as work is completed.

5. Performing seeding requirements as required.

6. Minimizing the amount of construction equipment operating during any given time period.

This includes scheduling of construction truck trips to reduce peak emission, limit the length of the construction workday, and phasing of construction activities.

7. Covering haul trucks traveling onto or off the work site. Haul trucks traveling on the work site shall be covered as necessary to prevent dust from leaving the work site.

1.12 WATER QUALITY CONTROL PLAN AND STORM WATER POLLUTION PREVENTION PLAN
A. The construction activities have potential for resulting in localized, short-term impacts to water quality due to fuel or oil leaks or spills at fuel or oil transfer areas, erosion and runoff.

B. The Contractor shall prepare a Storm Water Pollution Prevention Plan (SWPPP) for the General Construction Storm Water Permit. Development of the SWPPP shall be accomplished by the Contractor using guidelines provided by the State Water Resources Control Board (SWRCB) for containment of construction activity pollutants such as wastes, erosion, and sediments. The SWPPP shall be submitted to the Regional Water Quality Control Board (RWQCB) five (5) working days prior to field mobilization. The SWPPP must be approved by the RWQCB prior to the start of construction activities. Guidelines for the SWPPP are presented in the Construction Storm Water Permit Package available at the Redding, California, office of the RWQCB. The SWPPP shall include provisions for water quality protection and for implementing Best Management Practices (BMPs) chosen to reduce and mitigate construction activity pollutants. The Contractor shall implement this plan during all construction activities by providing BMPs and conforming to the following provisions.

C. Erosion could potentially cause impacts both on and off the work site. On the work site, erosion could wash away soil and fill material, resulting in the formation of gullies. Off the work site, erosion could result in downstream sedimentation and turbidity impacts.

Additionally, the Contractor shall:

1. Restrict personnel to designated roads.

Page 100 of 412 ends

General Vang Pao Park Section 01570
February 2026 Environmental Protection
01570 - 7

2. Use methods for controlling erosion on designated roads.

3. Use methods for on-site erosion control and sediment capture methods during construction.

4. Minimize erosion during stormy weather at the work site.

5. Use methods for post construction erosion control.

6. If drainage swales are employed as BMPs, they shall be vegetated or otherwise protected to reduce erosion.

7. Contact personnel and emergency procedures shall be posted at the work site to avoid and minimize loss of property and life in case of a significant storm event.

8. The project Storm Water Pollution Prevention Plan (SWPPP) shall be strictly implemented.

9. All settleable solids, oils, and grease shall be contained to prevent their release into the environment. Flocculents may be used on solids that do not readily settle, as long as they do not contaminate water quality.

10. Excess construction and operation materials, rubble, and excavated soil shall be either reused or disposed of in approved sites. All imported fill shall be obtained from approved sources

11. Exposed areas shall be stabilized with temporary mulching, landscaping, and other erosion control methods during and after land disturbance activities.

12. Areas of disturbance with slopes toward a stream shall be stabilized to reduce erosion potential.

13. Stock piles shall be protected from erosion either by covering them or by placing barriers (e.g. silt fence, sand bags) around their perimeter to prevent the escape of sediments.

14. Spoil disposal areas shall be graded to ensure that drainage from these sites will minimize erosion of spoil materials and adjacent native soil material. Grading shall conform with the existing topography of the area.

D. Streams, Creeks, Drainages or Waterbody Crossings:

1. Berms or other diversion structures may be constructed around the work site to allow uninterrupted flow in streams, creeks or waterbody crossings. Construction shall be separated into two phases to maintain flows through half the waterbody width unless otherwise directed. When the diversion is installed, water shall be directed into siltation basins. If straw bales are used to form the basins, water shall be allowed to settle, filter through the straw, and flow over the natural terrain before returning to the stream. If earth fill is used to form the berm, water shall be allowed to settle, and flow over the

Page 101 of 412 ends

General Vang Pao Park Section 01570
February 2026 Environmental Protection
01570 - 8
protected berm onto the natural terrain before returning to the stream.

2. Earth moving activities shall not occur in streams, creeks, waterbody crossings, or riparian areas within 24 hours of predicted 50 percent chance of National Weather Service anticipated precipitation during the rainy season (November 15 through April 15). Stockpiled topsoil or backfill shall be stored above the stream high water mark, outside any riparian zone, and not in any area where the stockpiled material could be washed back into the stream. Straw bales or other BMPs shall be used at flowing river or creek crossings at the end of each workday during the rainy season, and at the end of each workday during other seasons when rain is forecast. If a major storm is predicted or occurs outside of the rainy season, straw bales or other BMPs shall be implemented immediately.

3. Any diversion site, siltation basin and other measures shall be inspected during day light hours and after normal working hours during adverse weather conditions for proper operation. Any measure not operating properly or effectively shall be corrected immediately.

1.14 FIRE PREVENTION AND CONTROL PLAN
A. The Contractor shall prepare a fire prevention and control plan in consultation with the Engineer, and responsible fire protection agency(s). The following components, if applicable, shall be included in the plan, and if not applicable the Contractor shall explain in the plan why that component or a portion thereof is not included in the plan:

1. Procedures and policies for controlling any fires including fires that are off the work site, and other related fire prevention and control procedures developed in consultation with resource agencies and fire protection agency(s).

2. No fires will be allowed at the work site. Smoking will be allowed only in areas designated for smoking which shall be cleared of vegetation or in enclosed vehicles.

3. The Contractor shall be responsible for maintaining appropriate fire suppression equipment at the work site. Fire extinguishers, shovels and other fire fighting equipment, shall be inventoried and available at work sites and on construction equipment. Each vehicle on the right of way shall be equipped with a minimum 20 pound (or two 10 pound) fire extinguisher(s) and a minimum of five gallons of water in a fire fighting apparatus (e.g. bladder bag).

4. At the work site, a sealed fire toolbox shall be located at a point accessible in the event of fire.

This fire toolbox shall contain: one backpack pump-type extinguisher filled with water, two axes, two McLeod fire tools, and enough shovels so that each employee at the work site can be equipped to fight fire.

5. One or more chainsaws of 3-1/2 or more horsepower with a cutting bar 20 inches in length or longer shall be immediately available at the work site.

Page 102 of 412 ends

General Vang Pao Park Section 01570
February 2026 Environmental Protection
01570 - 9

6. Gasoline powered construction equipment with catalytic converters shall be equipped with shielding or other acceptable fire prevention features. Internal combustion engines shall be equipped with spark arrestors.

7. Welding sites shall include fire prevention provisions.

8. The Contractor shall maintain contact with local fire fighting agencies throughout the fire season for update on fire conditions and such fire conditions shall be communicated to the Contractor's employees and the Engineer daily.

9. Vehicles are restricted to the work site unless otherwise allowed for fire control procedures.

10. Disturbance to the terrestrial or aquatic environment through the use of heavy construction equipment shall be kept to a minimum. Clearing of vegetation shall occur from the outer boundaries of the work area toward the interior. If a fire should start, the appropriate fire protection agencies responsible shall be contacted immediately. Hand crews, fire fighting water trucks or other fire control measures may be used as a first defense. Only as required, heavy construction equipment shall be utilized to contain the fire or protect a structure from damage.

1.15 NOISE CONTROL PLAN
A. The Contractor shall prepare a Noise Control Plan in consultation with the City and the Engineer.

The following components, if applicable, shall be included in the plan. If the components are not applicable, the Contractor shall explain in the plan why the component or portion is not included in the plan.

1. All construction vehicles and equipment, fixed or mobile, shall be equipped with properly operating and maintained mufflers.

2. Stockpiling and vehicle staging areas shall be sited as far as practical from residences.

3. Hours of construction shall be limited to the hours specified in applicable local noise ordinances.

PART 2 PRODUCTS

NOT USED
PART 3 EXECUTION

NOT USED
PART 4 PAYMENT

NOT USED

END OF SECTION

Page 103 of 412 ends

General Vang Pao Park Section 01600
February 2026 Product Requirements
01600-1
SECTION 01600

PRODUCT REQUIREMENTS
PART 1 GENERAL

1.01 SECTION INCLUDES
A. General product requirements.

B. Transportation, handling, storage and protection.

C. Product option requirements.

D. Substitution limitations and procedures.

E. Spare parts and maintenance materials.

1.02 RELATED SECTIONS
A. Section 01400 - Quality Requirements: Product quality monitoring.

B. Section 01300 - Submittal; review, information, procedure and project closeout.

1.03 SUBMITTALS
A. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.

B. Also see Section 01300 for Submittal requirements.

C. Shop Drawing Submittals: Prepared specifically for this Project.

D. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns.

E. Indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

PART 2 PRODUCTS

2.01 EXISTING PRODUCTS
A. Provide interchangeable components of the same manufacture for components being replaced.

2.02 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.

B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufactures named and meeting specifications, no options or substitutions allowed.

C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions: Submit a request for substitution for any manufacturer not named.

2.03 SPARE PARTS AND MAINTENANCE PRODUCTS
A. Provide spare parts, maintenance, and extra products of types and in quantities specified in individual specification sections.

B. Deliver to Project site; provide receipts to owner as part of close out documents.

Page 104 of 412 ends

General Vang Pao Park Section 01600
February 2026 Product Requirements
01600-2
PART 3 EXECUTION

3.01 SUBSTITUTION PROCEDURES
A. Instructions to Bidders specify time restrictions for submitting requests for substitutions during the bidding period. Comply with requirements specified in this section.

B. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents.

C. A request for substitution constitutes a representation that the submitter:

1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product.

2. Will provide the same warranty for the substitution as for the specified product.

3. Will coordinate installation and make changes to other Work which may be required for the Work to be complete with no additional cost to the Owner.

4. Waives claims for additional costs or time extension which may subsequently become apparent.

D. Substitution Submittal Procedure:

1. Submit three copies of request for substitution for consideration. Limit each request to one proposed substitution.

2. Submit shop drawings, product data, and certified test results attesting to the proposed product equivalence. Burden of proof is on proposer.

3. The Owner will notify Contractor in writing of decision to accept or reject request.

3.02 TRANSPORTATION AND HANDLING
A. Transport and handle products in accordance with manufacturer's instructions.

B. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.

C. Provide equipment and personnel to handle products by methods to prevent soiling disfigurement or damage.

3.03 STORAGE AND PROTECTION
A. Store and protect products in accordance with manufacturers' instructions.

B. Store with seals and labels intact and legible.

C. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product.

D. For exterior storage of fabricated products, place on sloped supports above ground.

E. Provide bonded off-site storage and protection when site does not permit on-site storage or protection.

F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

G. Store loose granular materials on solid flat surfaces in a well-drained area. Prevent mixing with foreign matter.

H. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.

I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

J. Deliveries of plant materials must be scheduled so that plant materials arrive no more than five calendar days prior to planting When temperatures exceed 90 degrees F,

Page 105 of 412 ends

General Vang Pao Park Section 01600
February 2026 Product Requirements
01600-3
plants must be stored under shade cloth and watered at least twice each day, as required to maintain plants in a healthy, turgid condition. Wilted and/or otherwise unhealthy plants shall be immediately removed from the job site.

END OF SECTION

Page 106 of 412 ends

General Vang Pao Park Section 01700
February 2026 Execution Requirements
01700 - 1
SECTION 01700

EXECUTION REQUIREMENTS
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes general procedural requirements governing execution of the Work including, but not limited to, the following:

1.Construction layout.

2. Field engineering and surveying.

3. General installation of products.

4.Coordination of Owner-installed products.

5. Progress cleaning.

6. Starting and adjusting.

7. Protection of installed construction.

8.Correction of the Work.

B. Related Sections include the following:

1. General Conditions Section "Cutting and Patching" for procedural requirements for cutting and patching necessary for the installation or performance of other components of the Work.

2. Division 1 Section "Closeout Procedures" for submitting final property survey with Project Record Documents, recording of Owner-accepted deviations from indicated lines and levels, and final cleaning.

1.3 SUBMITTALS
A. Qualification Data: For land surveyor.

B. Certificates: Submit certificate signed by land surveyor certifying that location and elevation of improvements comply with requirements.

C. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to accept hazardous materials, for hazardous waste disposal.

D. Certified Surveys: Submit two copies signed by land surveyor.

Page 107 of 412 ends

General Vang Pao Park Section 01700
February 2026 Execution Requirements
01700 - 2
E. Final Project Survey: Submit digital copies in AutoCAD and Adobe Acrobat format showing the Work performed and recorded survey data.

1.4 QUALITY ASSURANCE
A. Land Surveyor Qualifications: A professional land surveyor who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing land-surveying services of the kind indicated.

PART 2 - PRODUCTS Not Used
PART 3 - EXECUTION

3.1 EXAMINATION
A. Existing Conditions: The existence and location of site improvements, utilities, and other construction indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work.

1. Before construction, verify the location and points of connection of utility services.

B. Existing Utilities: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning site work, investigate and verify the existence and location of underground utilities and other construction affecting the Work.

1.Before construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer, and water-service piping; and underground electrical services.

2. Furnish location data for work related to Project that must be performed by public utilities serving Project site.

C. Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.

1. Written Report: Where a written report listing conditions detrimental to performance of the Work is required by other Sections, include the following:
a. Description of the Work.
b. List of detrimental conditions, including substrates. c. List of unacceptable installation tolerances.
d. Recommended corrections.

2. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.

Page 108 of 412 ends

General Vang Pao Park Section 01700
February 2026 Execution Requirements
01700 - 3

3. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation.

4. Examine walls, floors, and roofs for suitable conditions where products and systems are to be installed.

5. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.

3.2 PREPARATION
A. Existing Utility Information: Furnish information to local utility or Owner that is necessary to adjust, move, or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected by construction. Coordinate with authorities having jurisdiction.

B. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work.

C. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings.

D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to Owner. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents. Changes to Work due to Contractors negligence to contact Owner for clarification shall be paid by Contractor.

3.3 CONSTRUCTION LAYOUT
A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered, notify Owner promptly.

B. General: Engage a land surveyor to lay out the Work using accepted surveying practices.

1. Establish benchmarks and control points to set lines and levels at each story of construction and elsewhere as needed to locate each element of Project.

2. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain required dimensions.

3.Inform installers of lines and levels to which they must comply.

4.Check the location, level and plumb, of every major element as the Work progresses.

5. Notify Owner when deviations from required lines and levels exceed allowable tolerances.

6.Close site surveys with an error of closure equal to or less than the standard established by authorities having jurisdiction.

Page 109 of 412 ends

General Vang Pao Park Section 01700
February 2026 Execution Requirements
01700 - 4
C. Site Improvements: Locate and lay out site improvements, including pavements, grading, fill and topsoil placement, utility slopes, and invert elevations.

D. Building Lines and Levels: Locate and lay out control lines and levels for structures, building foundations, column grids, and floor levels, including those required for mechanical and electrical work. Transfer survey markings and elevations for use with control lines and levels.

Level foundations and piers from two or more locations.

E. Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. Include beginning and ending dates and times of surveys, weather conditions, name and duty of each survey party member, and types of instruments and tapes used. Make the log available for reference by the Owner.

3.4 FIELD ENGINEERING
A. Identification: Owner will identify existing benchmarks, control points, and property corners.

B. Reference Points: Locate existing permanent benchmarks, control points, and similar reference points before beginning the Work. Preserve and protect permanent benchmarks and control points during construction operations.

1. Do not change or relocate existing benchmarks or control points without prior written approval of Owner. Report lost or destroyed permanent benchmarks or control points promptly. Report the need to relocate permanent benchmarks or control points to Owner before proceeding.

2.Replace lost or destroyed permanent benchmarks and control points promptly.

Base replacements on the original survey control points.

C. Benchmarks: Establish and maintain a minimum of two permanent benchmarks on Project site, referenced to data established by survey control points. Comply with authorities having jurisdiction for type and size of benchmark.

1.Record benchmark locations, with horizontal and vertical data, on Project Record Documents.

2. Where the actual location or elevation of layout points cannot be marked, provide temporary reference points sufficient to locate the Work.

3.Remove temporary reference points when no longer needed. Restore marked construction to its original condition.

D. Certified Survey: On completion of foundation walls, major site improvements, and other work requiring field-engineering services, prepare a certified survey showing dimensions, locations, angles, and elevations of construction and site work.

3.5 INSTALLATION
A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

Page 110 of 412 ends

General Vang Pao Park Section 01700
February 2026 Execution Requirements
01700 - 5

1. Make vertical work plumb and make horizontal work level.

2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement.

3.Conceal pipes, ducts, and wiring in finished areas, unless otherwise indicated.

4. Maintain minimum headroom clearance of 8 feet (2.4 m) in spaces without a suspended ceiling.

B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.

C. Install products at the time and under conditions that will ensure the best possible results.

Maintain conditions required for product performance until Substantial Completion.

D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.

E. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.

F. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements.

G. Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component securely in place, accurately located and aligned with other portions of the Work.

1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Owner.

2. Allow for building movement, including thermal expansion and contraction.

3.Coordinate installation of anchorages. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.

H. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.

I. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.

3.6 PROGRESS CLEANING
A. General: Clean Project site and work areas daily, including common areas. Coordinate progress cleaning for joint-use areas where more than one installer has worked. Enforce requirements strictly. Dispose of materials lawfully.

1.Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.

Page 111 of 412 ends

General Vang Pao Park Section 01700
February 2026 Execution Requirements
01700 - 6

2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).

3.Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.

B. Site: Maintain Project site free of waste materials and debris.

C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.

1.Remove liquid spills promptly.

2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.

D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.

E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.

F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.

G. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.

H. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.

I. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.

J.Limiting Exposures: Supervise construction operations to assure that no part of the construction completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.

3.7 STARTING AND ADJUSTING
A. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, replace with new units, and retest.

B. Adjust operating components for proper operation without binding. Adjust equipment for proper operation.

C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties.

Replace damaged and malfunctioning controls and equipment.

Page 112 of 412 ends

General Vang Pao Park Section 01700
February 2026 Execution Requirements
01700 - 7
D. Manufacturer's Field Service: If a factory-authorized service representative is required to inspect field-assembled components and equipment installation, comply with qualification requirements in Division 1 Section "Quality Requirements."

3.8 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.

B. Comply with manufacturer's written instructions for temperature and relative humidity.

3.9 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.

Comply with requirements in General Conditions Section "Cutting and Patching."

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment. B. Restore permanent facilities used during construction to their specified condition.

C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair.

D. Repair components that do not operate properly. Remove and replace operating components that cannot be repaired.

E. Remove and replace chipped, scratched, and broken glass or reflective surfaces.

END OF SECTION

Page 113 of 412 ends

General Vang Pao Park Section 01770
February 2026 Closeout Procedures

01770-1
SECTION 01770

CLOSEOUT PROCEDURES
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Inspection procedures.

2. Warranties.

3. Final cleaning.

B. Related Sections include the following:

1. General Conditions "Payments and Completion" section for requirements for Final Completion and Final Payment.

2. Division 1 Section "Execution Requirements" for progress cleaning of Project site.

3. Division 1 Section "Project Record Documents" for submitting Record Drawings, Record Specifications, and Record Product Data.

4. Division 1 Section "Operation and Maintenance Data" for operation and maintenance manual requirements.

5. Divisions 2 through 16 Sections for specific closeout and special cleaning requirements for the Work in those Sections.

1.3 SUBSTANTIAL COMPLETION
A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

1.Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2.Advise Owner of pending insurance changeover requirements.

3.Submit specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.

4.Obtain and submit releases permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

Page 114 of 412 ends

General Vang Pao Park Section 01770
February 2026 Closeout Procedures

01770-2

5. Prepare and submit Project Record Documents, operation and maintenance manuals, damage or settlement surveys, property surveys, and similar final record information.

6.Deliver tools, spare parts, extra materials, and similar items to location designated by Owner. Label with manufacturer's name and model number where applicable.

7.Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's personnel of changeover in security provisions.

8.Complete startup testing of systems.

9.Submit test/adjust/balance records.

10. Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements.

11. Advise Owner of changeover any applicable utilities.

12. Submit changeover information related to Owner's occupancy, use, operation, and maintenance.

13. Complete final cleaning requirements, including touchup galvanized painting.

14. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, Landscape Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Landscape Architect will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Landscape Architect, that must be completed or corrected before certificate will be issued.

1.Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2.Results of completed inspection will form the basis of requirements for Final Completion.

1.4 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit a final Application for Payment according to General Conditions "Payments and Completion".

2. Submit certified copy of Owner’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Owner.

The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

3. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

4. Instruct Owner's personnel in operation, adjustment, and maintenance of products, equipment, and systems.

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Landscape Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Owner will prepare a final Certificate for Payment after inspection

Page 115 of 412 ends

General Vang Pao Park Section 01770
February 2026 Closeout Procedures

01770-3
or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

1.5 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

1. Organize list of spaces in sequential order.

2. Organize items applying to each space by major element, including categories for grading, concrete, fences, walls, irrigation and planting.

3. Include the following information at the top of each page:
a. Project name.
b. Date.
c. Name of Owner Representative
d. Name of Contractor.
e. Page number.

1.6 WARRANTIES
A. Submittal Time: Submit written warranties on request of Landscape Architect for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated.

B. Partial Occupancy: Submit properly executed warranties within 15 days of completion of designated portions of the Work that are completed and occupied or used by Owner during construction period by separate agreement with Contractor.

C. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.

1. Bind warranties and bonds in heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11- inch (215-by-280-mm) paper.

2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty.

Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.

3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.

Page 116 of 412 ends

General Vang Pao Park Section 01770
February 2026 Closeout Procedures

01770-4
D. Provide additional copies of each warranty to include in operation and maintenance manuals.

PART 2 - PRODUCTS

2.1 MATERIALS
A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

PART 3 - EXECUTION

3.1 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.

1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.
c. Rake grounds that are neither planted nor paved to a smooth, even-textured surface. d. Remove tools, construction equipment, machinery, and surplus material from Project site.
e. Clean exposed exterior finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.
f. Remove labels that are not permanent.
g. Touch up and otherwise repair and restore marred, exposed finishes and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration. 1) Do not paint over "UL" and similar labels, including mechanical and electrical nameplates. h. Wipe surfaces of mechanical and electrical equipment and similar equipment. Remove excess lubrication, paint and mortar droppings, and other foreign substances.

Page 117 of 412 ends

General Vang Pao Park Section 01770
February 2026 Closeout Procedures

01770-5
i. Replace parts subject to unusual operating conditions. j. Leave Project clean and ready for occupancy.

C. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Owner's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.

END OF SECTION

Page 118 of 412 ends

General Vang Pao Park Section 01780
February 2026 Closeout Submittals
01780-1
SECTION 01780

CLOSEOUT SUBMITTALS
PART 1 GENERAL

1.01 SECTION INCLUDES
A. Project Record Documents.

B. Operation and Maintenance Data.

C. Training.

D. Warranties and bonds.

1.02 RELATED SECTIONS
A. Section 01300 - Administrative Requirements: Submittals procedures, shop drawings, product data, and samples.

B. Individual Product Sections: Specific requirements for operation and maintenance data.

C. Individual Product Sections: Warranties required for specific products or Work.

1.03 SUBMITTALS
A. Project Record Documents: Submit documents to the Owner with claim for final Application for Payment.

B. Operation and Maintenance Data:

1. Submit two copies of preliminary draft or proposed formats and outlines of contents before start of Work. Landscape Architect will review draft and return one copy with comments.

2. For equipment, or component parts of equipment put into service during construction and operated by the Owner, submit completed documents within ten days after acceptance.

3. Submit 1 copy of completed documents 15 days prior to final inspection. This copy will be reviewed and returned after final inspection, with Landscape Architect comments. Revise content of all document sets as required prior to final submission.

4. Submit two sets of revised final documents in final form within 10 days after final inspection.

C. Warranties and Bonds:

1. For equipment or component parts of equipment put into service during

Page 119 of 412 ends

General Vang Pao Park Section 01780
February 2026 Closeout Submittals
01780-2
construction with the City’s permission, submit documents within ten days after acceptance.

2. Make other submittals within ten days after Date of Substantial Completion, prior to final Application for Payment.

3. For items of Work for which acceptance is delayed beyond Date of Substantial Completion, submit within ten days after acceptance, listing the date of acceptance as the beginning of the warranty period.

PART 2 PRODUCTS

NOT USED
PART 3 EXECUTION

3.01 PROJECT RECORD DOCUMENTS
A. Maintain on site one set of the following record documents; record actual revisions to the Work:

1. Drawings.

2. Specifications.

3. Addenda.

4. Change Orders and other modifications to the Contract.

5. Reviewed shop drawings, product data, and samples.

6. Manufacturer's instruction for assembly, installation, and adjusting.

B. Ensure entries are complete and accurate, enabling future reference by the City.

C. Store record documents separate from documents used for construction.

D. Record information concurrent with construction progress.

E. Specifications: Legibly mark and record at each product section description of actual products installed, including the following:

1. Manufacturer's name and product model and number.

2. Product substitutions or alternates utilized.

3. Changes made by Addenda and modifications.

F. Record Drawings and Shop Drawings: Legibly mark each item to record actual construction including:

1. Measured horizontal and vertical locations of underground utilities, irrigation and appurtenances, referenced to two permanent surface improvements.

2. Field changes of dimension and detail.

3. Details not on original Contract drawings.

Page 120 of 412 ends

General Vang Pao Park Section 01780
February 2026 Closeout Submittals
01780-3

3.02OPERATION AND MAINTENANCE DATA
A. For Each Product or System: List names, addresses and telephone numbers of Subcontractors and suppliers, including local source of supplies and replacement parts.

B. Product Data: Mark each sheet to dearly identify specific products and component parts, and data applicable to installation. Delete inapplicable information.

C. Drawings: Supplement product data to illustrate relations of component parts of equipment and systems, to show control and flow diagrams. Do not use Project Record Documents as maintenance drawings.

D. Typed Text: As required to supplement product data. Provide logical sequence of instructions for each procedure, incorporating manufacturer's instructions.

3.03 OPERATION AND MAINTENANCE DATA FOR MATERIALS AND FINISHES A. For Each Product, Applied Material, and Finish:

1. Product data, with catalog number, size, composition, and color and texture designations.

2. Information for re-ordering custom manufactured products.

B. Instructions for Care and Maintenance: Manufacturer's recommendations for cleaning agents and methods, precautions against detrimental cleaning agents and methods, and recommended schedule for cleaning and maintenance.

C. Moisture protection and weather-exposed products: Include product data listing applicable reference standards, chemical composition, and details of installation. Provide recommendations for inspections, maintenance, and repair.

3.04 OPERATION AND MAINTENANCE DATA FOR EQUIPMENT AND SYSTEMS A. For Each Item of Equipment and Each System:

1. Description of unit or system, and component parts.

2. Identify function, normal operating characteristics, and limiting conditions.

3. Include performance curves, with engineering data and tests.

4. Complete nomenclature and model number of replaceable parts.

B. Operating Procedures: Include start-up, break-in, and routine normal operating instructions and sequences. Include regulation, control, stopping, shutdown, and emergency instructions. Include summer, winter, and any special operating instructions.

C. Maintenance Requirements: Include routine procedures and guide for preventative maintenance and troubleshooting; disassembly, repair, and reassembly instructions; and

Page 121 of 412 ends

General Vang Pao Park Section 01780
February 2026 Closeout Submittals
01780-4
alignment, adjusting, balancing, and checking instructions.

D. Provide servicing and lubrication schedule, and list of lubricants required.

E. Include manufacturer's printed operation and maintenance instructions.

F. Include sequence of operation by controls manufacturer.

G. Provide original manufacturer's parts list, illustrations, assembly drawings, and diagrams required for maintenance.

H. Additional Requirements: As specified in individual product specification sections.

3.05 OPERATION AND MAINTENANCE MANUALS
A. Prepare instructions and data by personnel experienced in maintenance and operation of described products.

B. Prepare data in the form of an instructional manual.

C. Binders: Commercial quality, 8-1/2 x 11 inch three D side ring binders with durable plastic covers; 2 inch maximum ring size. When multiple binders are used, correlate data into related consistent groupings.

D. Cover: Identify each binder with typed or printed title OPERATION AND MAINTENANCE INSTRUCTIONS; identify title of Project; identify subject matter of contents.

E. Provide tabbed dividers for each separate product and system, with typed description of product and major component parts of equipment.

F. Text: Manufacturer's printed data, or typewritten data on 24-pound paper.

Drawings: Provide with reinforced punched binder tab. Bind in with text; fold larger drawings to size of text pages.

3.06 TRAINING
A. Provide training and orientation of City’s operating staff in proper care and operation of equipment, systems and controls.

B. Submit three copies of certificate, signed by Owner's Representative, attesting to their having been instructed.

3.07 WARRANTIES AND BONDS
A. Obtain warranties and bonds, executed in duplicate by responsible Subcontractors, suppliers, and manufacturers, within ten days after completion of the applicable item of work. Except for items put into use with the City’s permission, leave date of beginning

Page 122 of 412 ends

General Vang Pao Park Section 01780
February 2026 Closeout Submittals
01780-5
of time of warranty until the Date of Substantial completion is determined.

B. Verify that documents are in proper form, contain full information, and are notarized.

C. Co-execute submittals when required.

D. Retain warranties and bonds until time specified for submittal.

END OF SECTION

Page 123 of 412 ends

General Vang Pao Park Section 01782
February 2026 Operation and Maintenance Data
01782-1
SECTION 01782

OPERATION AND MAINTENANCE DATA
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes administrative and procedural requirements for preparing operation and maintenance manuals, including the following:

1. Operation and maintenance documentation directory.

2. Emergency manuals.

3. Operation manuals for systems, subsystems, and equipment.

4. Maintenance manuals for the care and maintenance of products, materials, and finishes systems and equipment.

B. Related Sections include the following:

1. Division 1 Section "Administrative Requirements” for submitting copies of submittals for operation and maintenance manuals.

2. Division 1 Section "Closeout Procedures" for submitting operation and maintenance manuals.

3. Divisions 2 through 16 Sections for specific operation and maintenance manual requirements for the Work in those Sections.

1.3 DEFINITIONS
A. System: An organized collection of parts, equipment, or subsystems united by regular interaction.

B. Subsystem: A portion of a system with characteristics similar to a system.

1.4 SUBMITTALS
A. Initial Submittal: Submit 2 draft copies of each manual at least 15 days before requesting inspection for Substantial Completion. Include a complete operation and maintenance directory. Landscape Architect will return one copy of draft and mark whether general scope and content of manual are acceptable.

Page 124 of 412 ends

General Vang Pao Park Section 01782
February 2026 Operation and Maintenance Data
01782-2
B. Final Submittal: Submit one copy of each manual in final form at least 15 days before final inspection. Landscape Architect will return copy with comments within 15 days after final inspection.

1. Correct or modify each manual to comply with Landscape Architect's comments. Submit 3 copies of each corrected manual within 15 days of receipt of Landscape Architect's comments.

1.5 COORDINATION
A. Where operation and maintenance documentation includes information on installations by more than one factory-authorized service representative, assemble and coordinate information furnished by representatives and prepare manuals.

PART 2 - PRODUCTS

2.1 OPERATION AND MAINTENANCE DOCUMENTATION DIRECTORY
A. Organization: Include a section in the directory for each of the following:

1. List of documents.

2. List of systems.

3. List of equipment.

4. Table of contents.

B. List of Systems and Subsystems: List systems alphabetically. Include references to operation and maintenance manuals that contain information about each system.

C. List of Equipment: List equipment for each system, organized alphabetically by system.

For pieces of equipment not part of system, list alphabetically in separate list.

D. Tables of Contents: Include a table of contents for each emergency, operation, and maintenance manual.

E. Identification: In the documentation directory and in each operation and maintenance manual, identify each system, subsystem, and piece of equipment with same designation used in the Contract Documents. If no designation exists, assign a designation according to ASHRAE Guideline 4, "Preparation of Operating and Maintenance Documentation for Building Systems."

2.2 MANUALS, GENERAL
A. Organization: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain the following materials, in the order listed:

Page 125 of 412 ends

General Vang Pao Park Section 01782
February 2026 Operation and Maintenance Data
01782-3

1. Title page.

2. Table of contents.

3. Manual contents.

B. Title Page: Enclose title page in transparent plastic sleeve. Include the following information:

1. Subject matter included in manual.

2. Name and address of Project.

3. Name and address of Owner.

4. Date of submittal.

5. Name, address, and telephone number of Contractor.

6. Name and address of Landscape Architect.

7. Cross-reference to related systems in other operation and maintenance manuals.

C. Table of Contents: List each product included in manual, identified by product name, indexed to the content of the volume, and cross-referenced to Specification Section number in Project Manual.

1. If operation or maintenance documentation requires more than one volume to accommodate data, include comprehensive table of contents for all volumes in each volume of the set.

D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder.

1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch (215-by280-mm) paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets.
a.If two or more binders are necessary to accommodate data of a system, organize data in each binder into groupings by subsystem and related components. Crossreference other binders if necessary to provide essential information for proper operation or maintenance of equipment or system.
b. Identify each binder on front and spine, with printed title "OPERATION AND MAINTENANCE MANUAL," Project title or name, and subject matter of contents. Indicate volume number for multiple-volume sets.

2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section. Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, crossreferenced to Specification Section number and title of Project Manual.

3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software diskettes for computerized electronic equipment.

4. Supplementary Text: Prepared on 8-1/2-by-11-inch (215-by-280-mm) white bond paper.

Page 126 of 412 ends

General Vang Pao Park Section 01782
February 2026 Operation and Maintenance Data
01782-4

5. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text. a.If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts.
b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations.

2.3 EMERGENCY MANUALS
A. Content: Organize manual into a separate section for each of the following:

1. Type of emergency.

2. Emergency instructions.

3. Emergency procedures.

B. Type of Emergency: Where applicable for each type of emergency indicated below, include instructions and procedures for each system, subsystem, piece of equipment, and component:

1. Fire.

2. Flood.

3. Gas leak.

4. Water leak.

5. Power failure.

6. Water outage.

7. System, subsystem, or equipment failure.

8. Chemical release or spill.

C. Emergency Instructions: Describe and explain warnings, trouble indications, error messages, and similar codes and signals. Include responsibilities of Owner's operating personnel for notification of Installer, supplier, and manufacturer to maintain warranties.

D. Emergency Procedures: Include the following, as applicable:

1. Instructions on stopping.

2. Shutdown instructions for each type of emergency.

3. Operating instructions for conditions outside normal operating limits.

4. Required sequences for electric or electronic systems.

5. Special operating instructions and procedures.

2.4 OPERATION MANUALS

Page 127 of 412 ends

General Vang Pao Park Section 01782
February 2026 Operation and Maintenance Data
01782-5
A. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections and the following information:

1. System, subsystem, and equipment descriptions.

2. Performance and design criteria if Contractor is delegated design responsibility.

3. Operating standards.

4. Operating procedures.

5. Operating logs.

6. Wiring diagrams.

7. Control diagrams.

8. Piped system diagrams.

9. Precautions against improper use.

10. License requirements including inspection and renewal dates. B. Descriptions:

Include the following:

1. Product name and model number.

2. Manufacturer's name.

3. Equipment identification with serial number of each component.

4. Equipment function.

5. Operating characteristics.

6. Limiting conditions.

7. Performance curves.

8. Engineering data and tests.

9. Complete nomenclature and number of replacement parts. C. Operating Procedures: Include the following, as applicable:

1. Startup procedures.

2. Equipment or system break-in procedures.

3. Routine and normal operating instructions.

4. Regulation and control procedures.

5. Instructions on stopping.

6. Normal shutdown instructions.

7. Seasonal and weekend operating instructions.

8. Required sequences for electric or electronic systems.

9. Special operating instructions and procedures.

D. Systems and Equipment Controls: Describe the sequence of operation, and diagram controls as installed.

E. Piped Systems: Diagram piping as installed, and identify color-coding where required for identification.

2.5 PRODUCT MAINTENANCE MANUAL

Page 128 of 412 ends

General Vang Pao Park Section 01782
February 2026 Operation and Maintenance Data
01782-6
A. Content: Organize manual into a separate section for each product, material, and finish.

Include source information, product information, maintenance procedures, repair materials and sources, and warranties and bonds, as described below.

B. Source Information: List each product included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and crossreference Specification Section number and title in Project Manual.

C. Product Information: Include the following, as applicable:

1. Product name and model number.

2. Manufacturer's name.

3. Color, pattern, and texture.

4. Material and chemical composition.

5. Reordering information for specially manufactured products.

D. Maintenance Procedures: Include manufacturer's written recommendations and the following:

1. Inspection procedures.

2. Types of cleaning agents to be used and methods of cleaning.

3. List of cleaning agents and methods of cleaning detrimental to product.

4. Schedule for routine cleaning and maintenance.

5. Repair instructions.

E. Repair Materials and Sources: Include lists of materials and local sources of materials and related services.

F. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.

1. Include procedures to follow and required notifications for warranty claims.

2.6 SYSTEMS AND EQUIPMENT MAINTENANCE MANUAL
A. Content: For each system, subsystem, and piece of equipment not part of a system, include source information, manufacturers' maintenance documentation, maintenance procedures, maintenance and service schedules, spare parts list and source information, maintenance service contracts, and warranty and bond information, as described below.

B. Source Information: List each system, subsystem, and piece of equipment included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual.

C. Manufacturers' Maintenance Documentation: Manufacturers' maintenance documentation including the following information for each component part or piece of equipment:

Page 129 of 412 ends

General Vang Pao Park Section 01782
February 2026 Operation and Maintenance Data
01782-7

1. Standard printed maintenance instructions and bulletins.

2. Drawings, diagrams, and instructions required for maintenance, including disassembly and component removal, replacement, and assembly.

3. Identification and nomenclature of parts and components.

4. List of items recommended to be stocked as spare parts.

D. Maintenance Procedures: Include the following information and items that detail essential maintenance procedures:

1. Test and inspection instructions.

2. Troubleshooting guide.

3. Precautions against improper maintenance.

4. Disassembly; component removal, repair, and replacement; and reassembly instructions.

5. Aligning, adjusting, and checking instructions.

6. Demonstration and training videotape, if available.

E. Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment.

1. Scheduled Maintenance and Service: Tabulate actions for daily, weekly, monthly, quarterly, semiannual, and annual frequencies.

2. Maintenance and Service Record: Include manufacturers' forms for recording maintenance.

F. Spare Parts List and Source Information: Include lists of replacement and repair parts, with parts identified and cross-referenced to manufacturers' maintenance documentation and local sources of maintenance materials and related services.

G. Maintenance Service Contracts: Include copies of maintenance agreements with name and telephone number of service agent.

H. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.

1. Include procedures to follow and required notifications for warranty claims.

PART 3 - EXECUTION

3.1 MANUAL PREPARATION
A. Operation and Maintenance Documentation Directory: Prepare a separate manual that provides an organized reference to emergency, operation, and maintenance manuals.

Page 130 of 412 ends

General Vang Pao Park Section 01782
February 2026 Operation and Maintenance Data
01782-8
B. Emergency Manual: Assemble a complete set of emergency information indicating procedures for use by emergency personnel and by Owner's operating personnel for types of emergencies indicated.

C. Product Maintenance Manual: Assemble a complete set of maintenance data indicating care and maintenance of each product, material, and finish incorporated into the Work.

D. Operation and Maintenance Manuals: Assemble a complete set of operation and maintenance data indicating operation and maintenance of each system, subsystem, and piece of equipment not part of a system.

1. Engage a factory-authorized service representative to assemble and prepare information for each system, subsystem, and piece of equipment not part of a system.

2. Prepare a separate manual for each system and subsystem, in the form of an instructional manual for use by Owner's operating personnel.

E. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.

1. Prepare supplementary text if manufacturers' standard printed data are not available and where the information is necessary for proper operation and maintenance of equipment or systems.

F. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams. Coordinate these drawings with information contained in Record Drawings to ensure correct illustration of completed installation.

1. Do not use original Project Record Documents as part of operation and maintenance manuals.

2. Comply with requirements of newly prepared Record Drawings in Division 1 Section "Project Record Documents."
G. Comply with Division 1 Section "Closeout Procedures" for schedule for submitting operation and maintenance documentation.

END OF SECTION

Page 131 of 412 ends

General Vang Pao Park Section 02100
February 2026 Demolition
02100-1
SECTION 02100

DEMOLITION
PART 1 GENERAL

1.01 DESCRIPTION
A. Work includes, but is not limited to the following:

1. The Contractor shall provide all equipment, tools, materials, and labor necessary to complete the Work.

2. Completely coordinate with Work of all other trades.

3. Provide protection for all existing objects or conditions designated on the Drawings to remain on the site or return to the Owner.

4. Provide protection to prevent injury or damage to persons or adjacent properties.

5. Remove and dispose of demolished materials from the site as indicated on the drawings.

6. Comply with applicable codes and ordinances concerning demolition operations.

B. Definition: The term "demolition", as used herein, includes the removal and disposal of all existing objects (except for those objects designated to remain) down to the existing grade level or subgrade level to the extent indicated or as otherwise required to permit new construction and all other Work as described in this Section necessary to complete all Demolition Work.

C. Use of explosives will not be permitted.

1.02 PERMITS, ORDINANCES, ETC.

Procure and pay for all necessary permits or certificates required to complete the Demolition Work specified. Make any and all required notifications and comply with all applicable Federal, State, and Local ordinances concerning demolition operations.

1.03 JOB CONDITIONS
Visit the site and examine the existing conditions and observe the conditions under which the Work is to be performed. Notify the Owner of unsatisfactory conditions and do not proceed with the Work until unsatisfactory conditions have been corrected in a

Page 132 of 412 ends

General Vang Pao Park Section 02100
February 2026 Demolition
02100-2
manner acceptable to the Owner. Note all conditions as to character and extent of Work involved.

1.04 PROTECTION
A. Execute all Demolition Work in an orderly and careful manner with due consideration for any existing condition designated to remain. Provide protection to preserve existing items indicated to remain and to prevent injury or damage to persons or adjacent properties.

B. Use all means necessary to protect existing conditions designated to remain and adjacent properties. Avoid any encroachment on adjacent properties. In the event of damage or loss to any existing condition designated to remain or adjacent properties, immediately make all repairs and replacements necessary to the approval of the Owner at no additional cost to Owner.

C. Do not interfere with the normal traffic on roads, streets, walks, or use of adjacent properties. Provide alternate routes around closed or obstructed traffic ways as required by governing regulations.

D. Protect existing trees per plans.

1.05 CUTTING AND PATCHING
Cut existing sidewalks, roads, and curbs as required to complete Demolition Work.

Pavement shall be cut vertically along straight lines forming the edges of the Demolition Work and so as not to damage the adjacent pavement. Repair all pavement as specified in Sections of the specification covering the applicable trades.

1.06 DUST CONTROL
Use all means necessary to prevent the spread of dust during performance of the Work of this Section; thoroughly moisten all surfaces as required to prevent dust being a nuisance to the public, neighbors, and concurrent performance of other work on the site.

PART 2 - PRODUCTS

2.01 OTHER MATERIALS
All other materials, not specifically described but required for proper completion of the Work of this Section, shall be as selected by the Contractor subject to approval by the Owner.

Page 133 of 412 ends

General Vang Pao Park Section 02100
February 2026 Demolition
02100-3
PART 3 - EXECUTION

3.01 PREPARATION
A. Notification
Notify the Owner at least two (2) full working days prior to commencing the Work of this Section.

B. Site Observation

1. Prior to all Work of this Section, carefully observe the entire site for all objects designated to be removed and to be preserved.

2. Contact the Underground Service Alert (U.S.A.) at 1-800-227-2600 to stake and mark the location of all existing utilities prior to the beginning of Work.

3. Locate all existing utility lines indicated on the Drawings to remain, and determine the requirements for their protection.

4. Locate, if any, all existing utility line indicated on the Drawings to be disconnected and capped, and determine all requirements for disconnecting and capping.

C. Clarification

1. The Drawings do not purport to show all objects existing on the site.

2. Before commencing the Work of this Section, verify with the Owner all objects to be removed and all objects to preserve.

D. Scheduling

1. Schedule all Work in a careful manner with all necessary consideration for adjacent properties and the general public.

2. Avoid interference with the use of, and passage to and from, adjacent properties.

3. Conduct operations so as not to interfere with the use of adjacent roads, streets, drives, walks, service lines, etc.

E. Disconnection of Utilities

Page 134 of 412 ends

General Vang Pao Park Section 02100
February 2026 Demolition
02100-4
Before starting site construction, arrange for the disconnection of all utility lines designated to be removed, relocated, or capped with the appropriate utility company. Utility company services for this Work shall be paid for by the Contractor.

F. Protection of Utilities
Retain and protect in operating condition all active utilities traversing the site designated to remain.

3.02 DEMOLITION OF OBJECTS
A. Remove and dispose of all existing objects (except for those objects designated to remain) down to existing grade level or subgrade level to the extent indicated or as otherwise required to permit new construction.

B. Tree Demolition – remove all of tree, tree trunk and roots, including below grade.

3.03 REQUIREMENTS FOR REMOVAL OF ASPHALT AND CONCRETE PAVEMENT A. Remove asphalt pavement to neatly saw edges. Make saw cuts to a minimum depth of one (1) inch below the bottom surface of the pavement. Where only the surface of existing asphalt pavement is to be removed, obtain approval of method from the Owner, and provide a minimum laying depth of one (1) inch of new pavement material at the join line. Where asphalt pavement adjoins a trench, trim the edges adjacent to the trench to neat straight lines before resurfacing to ensure that all areas to be resurfaced are accessible to the rollers used to compact the subgrade or paving materials.

B. Remove concrete pavement to neatly sawed edges. Make saw cuts a minimum depth of one (1) inch below the bottom surface of the pavement. If a saw cut in concrete pavement falls within three (3) feet of an expansion joint, construction joint, cold joint or edge, move the concrete to the joint or edge. The edges of existing concrete pavement adjacent to trenches, where damaged subsequent to saw cutting of the pavement, saw cut again to neat straight lines for the purpose of removing the damaged pavement areas. Such saw cuts shall be either parallel to the original saw cuts or shall be cut on an angle which departs from the original saw cut not more than one (1) inch in each six (6) inches.

C. Concrete curbs, gutters, cross gutters, driveways and walks: Remove concrete to neatly sawed edges, with saw cuts made to a minimum depth of one and one-half (I -1 /2) inches. Concrete sidewalk of driveway to be removed shall be neatly sawed in straight lines, either parallel to the curb or at right angles to the alignment of the sidewalk. No section to be replaced shall be smaller than thirty (30) inches in either length or width. If the saw cut in sidewalk or driveway fall within thirty (30) inches of a construction joint, expansion joint, cold joint or edge, the concrete shall be

Page 135 of 412 ends

General Vang Pao Park Section 02100
February 2026 Demolition
02100-5
removed to the joint or edge, except that where the saw cut would fall within twelve (12) inches of a score mark, the saw cut shall be made in and along the score mark.

Curb and gutter shall be sawed to a depth of one (1) inch below the bottom surface in a neat line at right angles to the curb face.

3.04 BACKFILL AND COMPACTION
All excavations left by the Demolition Work shall be filled and compacted to make the surface at these points conform in contour and density to that of the surrounding ground, and as specified per plan and these special provisions.

3.05 DISPOSAL OF DEBRIS
A. All material removed under this Contract, which is not to be salvaged or reused, or otherwise specified on the Plan shall become the property of the Contractor and be promptly disposed of. It shall be the responsibility of the Contractor to procure dumping facilities or other means of disposal for all items specified to be removed from the site. Storing or permitting refuse to accumulate on the site will not be permitted.

B. Disposal of all materials from the site shall be done in a lawful manner. Transport all refuse materials from the site without spilling on the streets.

C. Burning of refuse material on the site will not be permitted.

END OF SECTION

Page 136 of 412 ends

General Vang Pao Park Section 02230
February 2026 Site Clearing
02230-1
SECTION 02230

SITE CLEARING
PART 1 GENERAL

1.01 SCOPE OF WORK
A. Furnish all labor, material, equipment and services necessary to provide all work, complete in place, as indicated on Drawings and specified herein.

Work specified in this Section includes, but is not limited to the following:

1. Site preparation.

2. Tree protection.

3. Restore damaged improvements to original condition.

4. Existing Utilities.

5. Clearing and Grubbing.

6. Removing topsoil.

7. Removing existing improvements.

8. Backfill requirements.

9. Disposing of objectionable material.

B. Related Work Specified in Other Sections

1. SECTION 312000 – EARTHWORK
C. Related Documents

3. Section 311000 – Site Preparation.

D. Definitions

1. ANSI: American National Standards Institute.

2. CAL-OSHA: California Occupational Safety and Health Administration.

3. Topsoil: Natural or cultivated surface-soil layer containing organic matter and sand, silt, and clay particles; friable, pervious, and black or a darker shade of brown, gray, or red than underlying subsoil; reasonably free of subsoil, clay

Page 137 of 412 ends

General Vang Pao Park Section 02230
February 2026 Site Clearing
02230-2
lumps, gravel, and other objects more than 2-inches in diameter; and free of weeds, roots, and other deleterious materials.

1.02 SUBMITTALS
A. Follow Submittal procedure outlined in Administrative Requirements Specifications B. Project Record Documents: Record actual locations of pipe mains, valve, connections and invert elevations. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.

1.03 QUALITY ASSURANCE
A. Do not remove or prune trees without written approval from Owner.

B. Prune to the standards of the International Society of Arborists and to ANSI 300.

1.04 PROJECT CONDITIONS
A. Except for materials indicated to be stockpiled or to remain the Owner’s property, cleared materials are the Contractor's property. Remove cleared materials from site and dispose of in lawful manner.

B. Unidentified Materials; if unidentified materials are discovered, including hazardous materials that will require additional removal other than is required by the Contract Documents, immediately report the discovery to the Owner.

C. If necessary, the Owner will arrange for any testing or analysis of the discovered materials and will provide instructions regarding the removal and disposal of the unidentified materials.

PART 2 PRODUCTS

2.01 SOIL MATERIALS
A. Backfill excavations resulting from demolition operations with on-site or import materials conforming to structural backfill defined in Section 312000 – Earthwork.

PART 3 EXECUTION

3.01 SITE PREPARATION
A. Protect and maintain benchmarks and survey control points during construction.

B. Locate and clearly flag trees and vegetation to remain or to be relocated.

C. Protect existing site improvements to remain during construction.

D. Verify existing conditions at the site and include all work evident by site inspection

Page 138 of 412 ends

General Vang Pao Park Section 02230
February 2026 Site Clearing
02230-3
whether or not shown on the Drawings.

3.02 TREE PROTECTION
A. Erect and maintain temporary fence around drip line of individual trees or around perimeter drip line of groups of trees to remain. Remove fence when construction is complete.

B. Do not store construction materials, debris, or excavated material within drip line of remaining trees.

C. Do not permit vehicles or equipment within drip line of remaining trees.

D. Do not excavate within drip line of remaining trees, unless otherwise indicated.

E. Where excavation for new construction is required within drip line of trees, hand clear and excavate to minimize damage to root systems. Use narrow-tine spading forks, comb soil to expose roots, and cleanly cut roots as close to excavation edge as possible.

1. Cover exposed roots with burlap and water regularly.

2. Temporarily support and protect roots from damage until they are permanently relocated and covered with soil.

3. Coat cut faces of roots more than 1-1/2-inches in diameter with an emulsified asphalt or other approved coating formulated for use on damaged plant tissues.

4. Cover exposed roots with wet burlap to prevent roots from drying out. Backfill with soil as soon as possible.

F. Also see Tree Protection requirements outlined on Construction Drawings.

3.03 RESTORATION
A. Restore damaged improvements to their original condition, as acceptable to the Owner.

B. Repair or replace trees and vegetation indicated to remain that are damaged by construction operations, as directed by the Owner.

1. Employ a qualified, licensed arborist, to submit details of proposed repairs and to repair damage to trees and shrubs.

2. Replace trees that cannot be repaired and restored to full-growth status, as determined by the Owner.

3.04 UTILITIES
A. Locate, identify, disconnect, and seal or cap off utilities indicated to be removed or

Page 139 of 412 ends

General Vang Pao Park Section 02230
February 2026 Site Clearing
02230-4
abandoned.

B. Arrange to shut off indicated utilities with utility companies or verify that utilities have been shut off.

C. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless authorized in writing by the Owner, and then only after arranging to provide temporary utility services according to requirements indicated.

D. Coordinate utility interruptions with utility company affected.

E. Do not proceed with utility interruptions without the permission of the Owner and utility company affected. Notify Owner and utility company affected two working days prior to utility interruptions.

F. Excavate and remove underground utilities that are indicated to be removed.

G. Securely close ends of abandoned piping with tight fitting plug or wall of concrete minimum 6-inches thick.

3.05 CLEARING AND GRUBBING
A. Clear the site and remove obstructions, shrubs, grass, and other vegetation to permit installation of new construction. Removal includes digging out stumps and obstructions and grubbing roots.

B. Remove trash, debris, logs, concrete, masonry and other waste materials.

C. Do not remove trees, shrubs, and other vegetation indicated to remain or to be relocated.

D. Completely remove stumps, roots, obstructions, and debris extending to a depth of 18- inches below subgrade.

E. Use only hand methods for grubbing within drip line of remaining trees.

F. In areas not to be further excavated, fill depressions resulting from site clearing. Place and compact satisfactory soil materials per the geotechnical investigation report, to be procured and provided by Contractor.

G. Clear undergrowth and deadwood without disturbing subsoil.

3.06 TOPSOIL STRIPPING
A. Remove sod and grass before stripping topsoil.

B. Strip topsoil to whatever depths are encountered in a manner to prevent intermingling with underlying subsoil or other waste materials.

C. Remove trash, debris, weeds, roots, and other waste materials.

Page 140 of 412 ends

General Vang Pao Park Section 02230
February 2026 Site Clearing
02230-5
D. Stockpile topsoil materials designated to remain on site at a location approved by the Owner at a location away from edge of excavations without intermixing with subsoil.

Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust.

E. Do not stockpile topsoil within drip line of remaining trees.

3.07 SITE IMPROVEMENTS
A. Remove existing above- and below-grade improvements as indicated and as necessary to facilitate new construction.

B. Remove slabs, paving, curbs, and gutters, as indicated. Where concrete slabs, curb, gutter and asphalt pavements are designated to be removed, remove bases and subbase to surface of underlying, undisturbed soil.

C. Unless the existing full-depth joints coincide with line of pavement demolition, neatly saw-cut to full depth the length of existing pavement to remain before removing existing pavement. Saw-cut faces vertically.

D. Remove driveways, curbs, gutters and sidewalks by saw cutting to full depth. If saw cut falls within 30-inches of a construction joint, expansions joint, score mark or edge, remove material to joint, mark or edge.

3.08 BACKFILL
A. Place and compact material in excavations and depressions remaining after site clearing in conformance with Section 312000 – Earthwork.

3.09 DISPOSAL
A. Remove surplus unsuitable soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials, including trash and debris, and legally dispose of them off the Owner’s property.

END OF SECTION

Page 141 of 412 ends

General Vang Pao Park Section 02260
February 2026 Landscape Grading
02260-1
SECTION 02260

LANDSCAPE GRADING
PART 1 - GENERAL

1.01 WORK INCLUDED
A. Provide all labor, materials services and equipment indicated on Drawings and/or herein specified to complete all Landscape Grading Work.

B. Landscape grading shall consist of importing topsoil to cap turf areas, importing topsoil to create landscape berming, importing topsoil for tree hole back fill, ripping, establishing finish grade to conform to the contours, grades, line and shapes of rough grades established on Engineer’s plans. Work may also include loosening of compacted soils created during the course of construction.

C. Land alteration of existing topographic conditions to conform to the contours, grades, lines and shapes indicated on Engineer’s and the Owner’s plans.

D. Contractor shall furnish, place and settle all required backfill material to conform to the contours, grades, lines and shapes as indicated on the Drawings, and engineer’s plans.

1.02 RELATED WORK
A. SECTION 328400 – PLANTING IRRIGATION

1.03 DEFINITIONS
A. Finish grade: Finish grade: Finish grade shall mean the establishment of grades to 0.10 feet plus or minus.

B. Grading intent: Spot elevations (grades) and contours are indicated based on the best available data. Owner’s Representative’s Drawings are referenced to provide site grading data. The intent is to maintain constant slopes between spot elevations. If a spot elevation is determined to be in error, or the difference in elevation between points change contact the Owner immediately for field adjustments of spot elevations.

1.04 JOB CONDITIONS
A. Visit the project site and examine the existing conditions under which the Work is to be performed. Note all conditions, as to character and extent of Work involved. This may include pot holing to determine depth of bedrock

1.05 EXISTING UTILITIES
A. Contractor is responsible to contact U.S.A (800-642-2444) to stake and mark the location of all existing utilities before commencing Work. Pot hole as required to determine and verify location and depth.

Page 142 of 412 ends

General Vang Pao Park Section 02260
February 2026 Landscape Grading
02260-2
B. Retain and protect in operating condition all active utilities traversing the site designated to remain.

1.06 PROTECTION OF EXISTING CONDITIONS and ADJACENT PROPERTIES A. Use all means necessary to protect existing conditions designated to remain, newly constructed conditions and adjacent properties. Avoid any encroachment on adjacent properties.

B. Prevent damage to existing bench marks, pavement, utility lines. In the event of damage or loss immediately make all repairs and replacements required to the Owner's approval at no additional cost to the Owner.

1.07 QUALITY ASSURANCE
A. Finish grade shall conform to contours, grades, lines and shapes, as indicated on Owner’s Representative’s Drawings, with uniform slopes between finish grades or between finish grades and existing grades.

B. Establish finish landscape grades in a continuous, uniform line, resulting in a uniform surface with no ridges, birdbaths or low spots.

C. Finish landscape grade tolerance shall be .04 feet plus or minus of final grades indicated on Drawings.

D. Slope grade away from buildings a minimum of two (2) percent in five (5) feet horizontal distance unless otherwise indicated on Drawings, or Owner’s Representative’s plans.

1.08 SUBMITTALS
A. Provide one (1) cubic foot sample of import topsoil material for the Owner's approval prior to delivery to the site, but in any case, prior to placement.

B. Procure and provide horticultural soils report of existing landscape soil after rough grade and submitted topsoil including information on soil texture, filtration rate, nutrient levels and organic matter. Include recommendation for amendment to be added to existing landscape soil and topsoil to mitigate any deficiencies.

PART 2 - PRODUCTS

2.01 ONSITE MATERIAL
A. Existing onsite excavated surplus material may be acceptable fill or top soil material, if approved by the Owner or Owner’s representative and upon submittal of a horticultural soils report and possible amending of existing soil to match criteria specified in this

Page 143 of 412 ends

General Vang Pao Park Section 02260
February 2026 Landscape Grading
02260-3
section for import top soil. Excavated surplus material not required for fill material or top soil shall be removed and legally disposed of off site.

2.02 IMPORTED TOPSOIL MATERIAL
A. Imported topsoil material shall be of friable sandy-loam texture free of refuse, roots, heavy or stiff clays, rocks over 1” in diameter , 15% by volume rock between 1/8” and 1”, sticks, other deleterious matter.

B. Imported topsoil acidity range (Ph) shall be between 6.5 to 7.5, containing a minimum of 4% and a maximum of 25% organic matter.

C. Imported topsoil shall be free of all noxious weeds and other seeds.

D. Imported topsoil shall be amended as per soils report (refer to paragraph 1.08 B), at no additional cost to the Owner.

E. Topsoil shall be stock piled on site in an area free of rock and other deleterious materials.

Owner reserves the right to reject topsoil once placed in proper location per Part 3 if deleterious materials mixed in to topsoil.

PART 3 - EXECUTION

3.01 GENERAL
A. Conduct work in an orderly manner. Dirt shall not be permitted to accumulate on streets or sidewalks nor to be washed into storm drains.

B. Use all means required to prevent the erosion of freshly graded areas during construction and until such a time as proposed hard surfaces and landscaping have been constructed.

C. Excess on site material after material has been used to bring site to finished grade shall be removed and legally disposed of off site.

D. If there is not enough site material to bring site to grade, contractor shall import topsoil.

3.02 RIPPING
A. If, during the course of construction, landscape areas become compacted to greater than 90% relative density, landscape areas with the exception of areas beneath the canopies of existing trees shall be ripped and cross ripped to a depth of 12”.

B. Rip and cross rip to a depth of 6 inches all areas exposed by engineering cut operations.

Remove all rock one inch or larger within 6 inches of finish grades in all non-hydro mulch planted areas.

C. Rip and cross rip to a depth of 6 inches all turf areas prior to the placement of import topsoil.

Page 144 of 412 ends

General Vang Pao Park Section 02260
February 2026 Landscape Grading
02260-4

3.03 TOP SOIL PLACEMENT
A. Place topsoil to contours indicated on plans to create landscape berming.

B. Place topsoil in any way as indicated on plans
C. If insufficient on site soil is available, then contractor shall supply import topsoil.

3.04 FINISH LANDSCAPE GRADING
A. Finish grade shall conform, after settling, to shapes, spot elevations and contours as indicated on Owner’s Representative’s Drawings, with uniform levels or slopes between finish elevations or between finish elevations and existing elevations.

B. Fine grade all planting areas to a smooth, loose and uniform surface. Remove all extraneous matter 1” or larger in size and dispose of off site to create a smooth surface.

Finish grades shall slope to drain, without water pockets or irregularities (humps or hollows). Grades shall be or uniform slope between points of fixed elevation establishing vertical curves or roundings at abrupt changes in slope.

C. Shrub/ground cover planting areas shall be graded two and one-half (4-1/2) inches below adjacent paved areas, sidewalks, valve boxes, headers, drains, etc. in order to receive two (4) inch depth of mulch, establishing final grade one-half (1/2) inches below these surfaces.

D. Turf areas shall be graded one and one half (1-1/2) inches below adjacent paved areas, sidewalks, valve boxes, headers, drains, etc. in order to receive sod.

3.05 FINISH LANDSCAPE GRADING OBSERVATION
A. Soil preparation: comply with SECTION 328400 - LANDSCAPE INSTALLATION prior to finish grading operations
B. Finish grade shall conform, after compaction, to shapes, spot elevations and contours as indicated on Drawings, with uniform levels or slopes between finish elevations or between finish elevations and existing elevations.

C. The Contractor is responsible to spread excess excavated soil material from plant pits in surrounding planting beds.

D. Fine grade topsoil in all planting areas eliminating rough and low areas to insure positive drainage, to a smooth, loose and uniform surface. Maintain levels, profiles and contours of sub-grades.

E. Remove stones, roots, grass, weeds, debris and other foreign material while spreading, in excess of one inch in diameter.

Page 145 of 412 ends

General Vang Pao Park Section 02260
February 2026 Landscape Grading
02260-5
F. Shrub/ground cover planting areas shall be graded two and one-half (4-1/2) inches below adjacent paved areas, sidewalks, valve boxes, headers, drains, etc. in order to receive two (4) inch depth of mulch, establishing final grade one-half (1/2) inches below these surfaces

END OF SECTION

Page 146 of 412 ends

General Vang Pao Park Section 02316
February 2026 Fill and Backfill

02316-1
SECTION 02316

FILL AND BACKFILL
PART 1 GENERAL

1.01 SECTION INCLUDES

A. Filling and compacting for concrete paving and rigid concrete pavements subject to traffic loadings.

B. Backfilling and compacting for utilities to utility main connections.

1.02 RELATED SECTIONS

A. General Conditions and Special Provisions for Air and Water Pollution Control and Dust Control
B. Section 02260 – Landscape Grading
C. Section 030000 – Concrete
D. Section 328400 – Planting Irrigation

1.03 REFERENCES
A. ASTM C 136 - Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates; 1996a.

B. ASTM D 1557 - Test Method for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN mlm3)); 1991 (Reapproved 1998).

C. ASTM D 2487 - Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System); 1998.

D. ASTM D 2922 - Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth); 1996.

E. ASTM D 2974 - Standard Test Methods for Moisture, Ash, and Organic Matter of Peat and Other Organic Soils; 1996.

E. ASTM D 3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth); 1996.

F. ASTM D 4318 - Standard Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils; 1998.

1.04 PROJECT CONDITIONS
A. Provide sufficient quantities of fill to meet project schedule and requirements. When necessary, store materials on site in advance of need.

B. Verify that survey benchmarks and intended elevations for the Work are as indicated.

PART 2 PRODUCTS

Page 147 of 412 ends

General Vang Pao Park Section 02316
February 2026 Fill and Backfill

02316-2

2.01 FILL MATERIALS
A. Engineered Fill: Subsoil excavated on-site.

1. Free of lumps larger than 3 inches, rocks larger than 2 inches, and debris.

2. Conforming to ASTM D 2487 Group Symbol CL, ML, SM, SP.

B. Engineered Fill: Imported borrow.

1. Graded in accordance with ASTM C 136, within the following limits:
a. 3 inch sieve: 100 percent passing.
b. 3/4 inch sieve: 70 to 100 percent passing.
c. No. 4 sieve: 50 to 100 percent passing.
d. 40 sieve: 30 to 100 percent passing.
e. 50: 30 to 100 percent passing.
f. No. 200: 30 to 70 percent passing.

2. Free of lumps larger than 3 inches, rocks larger than 2 inches, and debris.

3. Conforming to ASTM D 2487 Group Symbol CL, ML, SM, SP.

4. Liquid limit < 30. Plasticity Index < 12.

5. Organic content less than 3%.

6. Expansion potential (UBC 18-2) less than 20.

7. Maximum Dry Density more than 105 pcf.

C. Topsoil: See Section 02260.

D. Class 2 Aggregate Base: See Section 02721 Aggregate Base Course.

2.02 SOURCE QUALITY CONTROL
A. Where import fill materials are specified by reference to a specific standard, test and analyze samples for compliance before delivery to site.

B. If tests indicate materials do not meet specified requirements, change material and retest.

PART 3 EXECUTION

3.01 EXAMINATION
A. Identify required lines, levels, contours, and datum locations.

B. See Section 02260 for additional requirements.

3.02 PREPARATION
A. Scarify all areas to receive engineered fill and subgrade surfaces to a depth of 12 inches.

B. During wet weather or unstable soil conditions, the Contractor shall have the Owner’s Representative observe all areas to receive engineered fill and subgrade surfaces prior to implementation of remedial measures.

1. Upon approval of the Landscape Owner’s Representative, all unstable areas to receive engineered fill and subgrade surfaces shall be disked or ripped to a

Page 148 of 412 ends

General Vang Pao Park Section 02316
February 2026 Fill and Backfill

02316-3
minimum depth of 24 inches to allow exposed soil to dry. Depth and frequency of disking and ripping shall be determined by the Owner’s Representative upon observation of the unstable soil conditions.

2. Upon approval of the Owner’s Representative, all unstable areas to receive engineered fill and subgrade surfaces shall be over excavated 12 to 24 inches below existing grade and be replaced with aggregate base or coarse gravel underlain by geotextile fabric. Final depth of removal shall be determined by the Owner’s Representative upon observation of the unstable soil conditions. The geotextile fabric shall be Amoco 2016 (woven) or approved equivalent, placed in accordance with manufacturer's recommendations.

C. The Contractor shall have the Owner’s Representative observe and probe bottom of finish subgrade for its stability within existing trench fill extending to a width of 15 feet on each side of existing sanitary sewer pipelines beneath new pavement improvements.

1. If loose or soft material is encountered, the existing trench fill shall be removed to a depth of two feet below finished subgrade elevation. The Contractor shall have the Owner’s Representative observe and probe the bottom of the excavation for its stability prior to placing compacted engineered fill. If loose or soft material is encountered, geotextile/stabilizing fabric, Amoco 2016 (woven) or approved equivalent, shall be placed at the bottom of the excavation.

D. Recompact between 90 and 95 percent of maximum dry density at a uniform moisture content between 2 and 5 percent above optimum moisture content at the time of compaction.

E. Recompact to 95 percent of maximum dry density at a uniform moisture content between 2 and 5 percent above optimum moisture content at the time of compaction in the upper 12 inches of subgrade in all areas to support asphalt or rigid concrete pavements.

F. Until ready to fill, maintain excavations and prevent loose soil from falling into excavation.

3.03 FILLING
A. Fill to contours and elevations indicated using unfrozen materials.

B. Fill up to subgrade elevations unless otherwise indicated.

C. Employ a placement method that does not disturb or damage other work.

D. Do not fill over porous, wet, frozen or spongy subgrade surfaces.

E. Uniformly moisture-conditioned to between 2 and 5 percent above optimum moisture content of fill materials to attain required compaction density.

F. Soil Fill: Place and compact material in equal continuous layers not exceeding 8 inches loose thickness.

G. Correct areas that are over-excavated.

H. Compaction Density Unless Otherwise Specified or Indicated:

1. Between 90 and 95 percent of maximum dry density at a uniform moisture content between 2 and 5 percent above optimum moisture content at the time of compaction.

2. At 95 percent of maximum dry density in the upper 6 inches of subgrade in all areas to support asphalt or rigid concrete pavements.

Page 149 of 412 ends

General Vang Pao Park Section 02316
February 2026 Fill and Backfill

02316-4
I. Reshape and re-compact fills subjected to construction vehicular traffic.

3.04 FILL AT SPECIFIC LOCATIONS
A. Use engineered fill unless otherwise specified or indicated.

B. Engineered fill at areas to receive rigid concrete pavements:

1. Fill up to subgrade elevations.

2. Maximum depth per lift: 8 inches, loose thickness.

3. Between 88 and 92 percent of maximum dry density at a uniform moisture content at between 2 and 5 percent above optimum moisture content at the time of compaction.

4. Compact upper 6 inches of subgrade to minimum 95 percent of maximum dry density at between 2 and 5 percent above optimum moisture content at the time of compaction.

C. At Lawn Areas: See Section 02260 Landscape Grading
D. At Planting Areas Other Than Lawns: See Section 02260 Landscape Grading E. Trench Backfilling:

1. See Site Drainage, Potable Water Supply Specifications

2. See Section 328400 Planting Irrigation

3.05 TOLERANCES
A. Top Surface of General Filling: See Section 02260 Landscape Grading B. Top Surface of Filling Under Paved Areas: Plus or minus 0.05 foot from required elevations.

3.06 FIELD QUALITY CONTROL
A. Compaction density testing will be performed on compacted fill in accordance with ASTM D2922.

B. Results will be evaluated in relation to compaction curve determined by testing uncompacted material in accordance with ASTM D 1557 ("modified Proctor" ).

END OF SECTION

Page 150 of 412 ends

General Vang Pao Park Section 02721
February 2026 Aggregate Base Course

02721-1
SECTION 02721
AGGREGATE BASE COURSE – SITE CONCRETE PAVING AND FOOTINGS PART 1 GENERAL

1.01 SECTION INCLUDES
A. Aggregate base course.

B. Paving aggregates.

1.02 RELATED SECTIONS
A. Section 02260 – Landscape Grading.

B. Section 02316 - Fill and Backfill.

C. Special Provisions: Aggregate Base, Asphalt Concrete, Storm Drain Pipe, Sanitary Sewer, Sewer and Storm Drain Manholes, Potable Water Supply and Miscellaneous Concrete Construction
D. Section 030000 – Concrete
E. Section 328400 – Planting Irrigation

1.03 REFERENCES
A. ASTM C 136 - Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates; 1996a.

B. ASTM D 1557 Test Method for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN m/m3)); 1991 (Reapproved 1998).

C. ASTM D 2487 - Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System); 1998.

D. ASTM D 2922 - Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth); 1996.

E. ASTM D 3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth); 1996.

1.04 SUBMITTALS
A. Materials Sources: Submit name of imported materials source.

B. Aggregate Composition Test Reports: Results of laboratory tests on proposed and actual materials used.

C. Compaction Density Test Reports.

1.05 PROJECT CONDITIONS

A. Provide sufficient quantities of aggregate to meet project schedule and requirements.

When necessary, store materials on site in advance of need.

Page 151 of 412 ends

General Vang Pao Park Section 02721
February 2026 Aggregate Base Course

02721-2
B. Verify that survey benchmarks and intended elevations for the Work are as indicated.

PART 2 PRODUCTS

2.01 MATERIALS
A. Aggregate Base: Coarse aggregate, conforming to Section 26 of the State of California Highway Department Standards for 3/4-inch maximum Class 2 Aggregate Base.

2.02 SOURCE QUALITY CONTROL
A. If tests indicate materials do not meet specified requirements, change material and retest.

B. Provide materials of each type from same source throughout the Work.

PART 3 EXECUTION

3.01 EXAMINATION
A. Verify subgrade has been inspected, gradients and elevations are correct, and is moist but not pumping.

A.02 REPARATION
A. Correct irregularities in subgrade gradient and elevation by scarifying, reshaping, and re-compacting.

B. Do not place aggregate on soft, muddy, or frozen surfaces.

3.03 INSTALLATION
A. Under Concrete Paving and Footings:

1. Place aggregate base to a total compacted thickness as indicated on the Project Drawings.

2. Compact to 95 percent of maximum dry density.

3.04 TOLERANCES
A. Variation From Design Elevation: Within 0.05 feet.

3.05 FIELD QUALITY CONTROL
A. Compaction density testing will be performed on compacted aggregate base course in accordance with ASTM D2922 and ASTM D3017.

B. If tests indicate work does not meet specified requirements, remove work, replace and retest.

Page 152 of 412 ends

General Vang Pao Park Section 02721
February 2026 Aggregate Base Course

02721-3
C. Proof roll compacted aggregate at surfaces that will be under paving.

3.06 CLEAN-UP
A.Remove unused stockpiled materials, leave area in a clean and neat condition in accordance with Section 02260.

END OF SECTION

Page 153 of 412 ends

General Vang Pao Park Section 02764
February 2026 Pavement Joint Sealants
02764-1
SECTION 02764

PAVEMENT JOINT SEALANTS
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes the following:

1. Expansion and contraction joints within cement concrete pavement.

2. Joints between cement concrete and asphalt pavement.

3. Related Sections include the following:
i. Section 030000 - Concrete for constructing joints in concrete pavement.

1.3 SUBMITTALS
A. Product Data: For each joint-sealant product indicated.

B. Samples for Verification: For each type and color of joint sealant required. Install jointsealant samples in 1/2-inch- (13-mm-) wide joints formed between two 6inch- (150-mm-) long strips of material matching the appearance of exposed surfaces adjacent to joint sealants.

C. Qualification Data: For Installer and testing agency.

1.4 QUALITY ASSURANCE
A. Installer Qualifications: An employer of workers trained and approved by manufacturer.

B. Source Limitations: Obtain each type of joint sealant through one source from a single manufacturer.

1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to Project site in original unopened containers or bundles with labels indicating manufacturer, product name and designation, color, expiration date, pot life, curing time, and mixing instructions for multi-component materials.

Page 154 of 412 ends

General Vang Pao Park Section 02764
February 2026 Pavement Joint Sealants
02764-2
B. Store and handle materials to comply with manufacturer's written instructions to prevent their deterioration or damage due to moisture, high or low temperatures, contaminants, or other causes.

1.6 PROJECT CONDITIONS
A. Do not proceed with installation of joint sealants under the following conditions:

1. When ambient and substrate temperature conditions are outside limits permitted by joint-sealant manufacturer.

2. When joint substrates are wet or covered with frost.

3. Where joint widths are less than those allowed by joint-sealant manufacturer for applications indicated.

4. Where contaminants capable of interfering with adhesion have not yet been removed from joint substrates.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products listed in other Part 2 articles.

2.2 MATERIALS, GENERAL
A. Compatibility: Provide joint sealants, backing materials, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by joint-sealant manufacturer based on testing and field experience.

B. Colors of Exposed Joint Sealants: As selected by Owner’s Representative from manufacturer's full range.

2.3 COLD-APPLIED JOINT SEALANTS
A. Multicomponent Jet-Fuel-Resistant Sealant for Concrete: Pourable, chemically curing elastomeric formulation complying with the following requirements for formulation and with ASTM C 920 for type, grade, class, and uses indicated:

1. Urethane Formulation: Type M; Grade P; Class 12-1/2; Uses T, M, and, as applicable to joint substrates indicated, O.
a. Products:
1) Pecora Corporation; Urexpan NR-300.

Page 155 of 412 ends

General Vang Pao Park Section 02764
February 2026 Pavement Joint Sealants
02764-3

2. Coal-Tar-Modified Polymer Formulation: Type M; Grade P; Class 25; Uses T and, as applicable to joint substrates indicated, O.
a. Products:
1) Meadows, W. R., Inc.; Sealtight Gardox.

3. Bitumen-Modified Urethane Formulation: Type M; Grade P; Class 25; Uses T, M, and, as applicable to joint substrates indicated, O.
a. Products:
1) Tremco Sealant/Waterproofing Division; Vulkem 202.

B. Single-Component Jet-Fuel-Resistant Urethane Sealant for Concrete: Singlecomponent, pourable, coal-tar-modified, urethane formulation complying with ASTM C 920 for Type S; Grade P; Class 25; Uses T, M, and, as applicable to joint substrates indicated, O.

1. Products:
a. Sonneborn, Div. of ChemRex, Inc.; Sonomeric 1.

C. Type NS Silicone Sealant for Concrete: Single-component, low-modulus, neutralcuring, nonsag silicone sealant complying with ASTM D 5893 for Type NS.

1. Products:
a.Crafco Inc.; RoadSaver Silicone.
b. Dow Corning Corporation; 888.

D. Type SL Silicone Sealant for Concrete and Asphalt: Single-component, lowmodulus, neutral-curing, self-leveling silicone sealant complying with ASTM D 5893 for Type SL.

1. Products:
a.Crafco Inc.; RoadSaver Silicone SL.
b. Dow Corning Corporation; 890-SL.

E. Multicomponent Low-Modulus Sealant for Concrete and Asphalt: Proprietary formulation consisting of reactive petropolymer and activator components producing a pourable, selfleveling sealant.

1. Products:
a. Meadows, W. R., Inc.; Sof-Seal.

Page 156 of 412 ends

General Vang Pao Park Section 02764
February 2026 Pavement Joint Sealants
02764-4

2.4 HOT-APPLIED JOINT SEALANTS
A. Jet-Fuel-Resistant Elastomeric Sealant for Concrete: Single-component formulation complying with ASTM D 3569.

1. Products:
a.Crafco Inc.; Superseal 444/777.
b. Meadows, W. R., Inc.; Poly-Jet 3569.

B. Jet-Fuel-Resistant Sealant for Concrete and Tar Concrete: Single-component formulation complying with ASTM D 3581.

1. Products:
a.Crafco Inc.; Superseal 1614A.
b. Meadows, W. R., Inc.; Poly-Jet 1614.
c.Meadows, W. R., Inc.; Poly-Jet 3406.
d. Meadows, W. R., Inc.; Poly-Jet 3569.

C. Elastomeric Sealant for Concrete: Single-component formulation complying with ASTM D 3406.

1. Products:
a.Crafco Inc.; Superseal 444/777.
b. Meadows, W. R., Inc.; Poly-Jet 3406.

D. Sealant for Concrete and Asphalt: Single-component formulation complying with ASTM D 3405.

1. Products:
a.Koch Materials Company; Product No. 9005.
b. Koch Materials Company; Product No. 9030.
c.Meadows, W. R., Inc.; Sealtight Hi-Spec.

2.5 JOINT-SEALANT BACKER MATERIALS
A. General: Provide joint-sealant backer materials that are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by joint-sealant manufacturer based on field experience and laboratory testing.

B. Round Backer Rods for Cold- and Hot-Applied Sealants: ASTM D 5249, Type 1, of diameter and density required to control sealant depth and prevent bottom-side adhesion of sealant.

Page 157 of 412 ends

General Vang Pao Park Section 02764
February 2026 Pavement Joint Sealants
02764-5
C. Backer Strips for Cold- and Hot-Applied Sealants: ASTM D 5249; Type 2; of thickness and width required to control sealant depth, prevent bottom-side adhesion of sealant, and fill remainder of joint opening under sealant.

D. Round Backer Rods for Cold-Applied Sealants: ASTM D 5249, Type 3, of diameter and density required to control sealant depth and prevent bottom-side adhesion of sealant.

2.6 PRIMERS
A. Primers: Product recommended by joint-sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealantsubstrate tests and field tests.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting joint-sealant performance.

1. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION
A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions.

B. Joint Priming: Prime joint substrates where indicated or where recommended in writing by joint-sealant manufacturer, based on preconstruction joint-sealant substrate tests or prior experience. Apply primer to comply with joint-sealant manufacturer's written instructions. Confine primers to areas of joint-sealant bond; do not allow spillage or migration onto adjoining surfaces.

3.3 INSTALLATION OF JOINT SEALANTS
A. General: Comply with joint-sealant manufacturer's written installation instructions for products and applications indicated, unless more stringent requirements apply.

B. Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions indicated.

C. Install backer materials of type indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.

Page 158 of 412 ends

General Vang Pao Park Section 02764
February 2026 Pavement Joint Sealants
02764-6

1. Do not leave gaps between ends of backer materials.

2. Do not stretch, twist, puncture, or tear backer materials.

3. Remove absorbent backer materials that have become wet before sealant application and replace them with dry materials.

D. Install sealants using proven techniques that comply with the following and at the same time backings are installed:

1. Place sealants so they directly contact and fully wet joint substrates.

2. Completely fill recesses provided for each joint configuration.

3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability.

E. Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants according to requirements specified below to form smooth, uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint.

1. Remove excess sealants from surfaces adjacent to joint.

2. Use tooling agents that are approved in writing by joint-sealant manufacturer and that do not discolor sealants or adjacent surfaces.

F. Provide joint configuration to comply with joint-sealant manufacturer's written instructions, unless otherwise indicated.

G. Provide recessed joint configuration for silicone sealants of recess depth and at locations indicated.

3.4 CLEANING
A. Clean off excess sealants or sealant smears adjacent to joints as the Work progresses by methods and with cleaning materials approved by manufacturers of joint sealants and of products in which joints occur.

3.5 PROTECTION
A. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated joint sealants immediately and replace with joint sealant so installations with repaired areas are indistinguishable from the original work.

END OF SECTION

Page 159 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-1
SECTION 02905

LANDSCAPE INSTALLATION

PART I - GENERAL

1.01 CONDITIONS
A. The general provisions of the Contract, including General and Supplementary Conditions and General Requirements (if any) apply to the work specified in this Section.

1.02 SCOPE OF WORK
A. Furnish all labor, material, equipment and services necessary to provide all landscape work, complete in place, as indicated on Drawings and specified herein.

Work specified in this Section, but is not limited to the following:

1. Soil preparation

2. Decomposed Granite Paving

3. Planting

4. Fertilizer

5. Tree Staking

6. Sodding

7. Clean-up

B. Related Work Specified in Other Sections

1. SECTION 02260 - LANDSCAPE GRADING

2. SECTION 320190.13 – EXTERIOR IMPROVEMENTS AND LANDSCAPE

MAINTENANCE

3. SECTION 328400 – PLANTING IRRIGATION

1.03 QUALITY ASSURANCE
A. Source Quality Control

Page 160 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-2

1. Submit documentation to the Owner at least sixty (60) days prior to start of planting that all plant material has been ordered. Arrange procedure for observation of plant material with the Owner at time of submission.

2. Plants shall be subject to observation and approval of the Owner upon delivery for conformity to specifications. Such approval shall not impair the right of observation and rejection during progress of the work.

1.04 PRODUCT DELIVERY, STORAGE AND HANDLING

A. Delivery

1. The Contractor, upon request by the Owner, shall provide receipts, delivery tickets, load tickets, etc. of all items delivered to the job site to verify products and total quantities.

2. Deliver fertilizer to site in original unopened containers bearing manufacturer's guaranteed chemical analysis, name trademark, and conformance to State Law.

3. Deliver plants with legible identification labels.

a. Label trees, evergreens, bundles of containers of like shrubs, or ground cover plants.
b. State correct plant name and size indicated on plant list. c. Use durable waterproof labels with water-resistant ink which will remain legible for at least sixty (60) days.

6. Protect plant material during delivery to prevent damage to root ball or desiccation of leaves.

7. The Contractor shall notify the Owner forty-eight (48) hours in advance of delivery of all plant materials for observation either at the site or at the local nursery.

B. Storage

1. Store plant material in shade and protect from weather.

2. Maintain and protect plant material. Contractor shall be responsible for replacement of material due to theft or vandalism.

C. Handling

1. Do not drop plant materials.

2. Do not pick up container plant material by stems or trunks.

Page 161 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-3

1.05 JOB CONDITIONS
A. Planting: Perform actual planting only when weather and soil conditions are suitable in accordance with locally accepted practice.

B. Scheduling: Install trees, shrubs, and ground cover plant material before lawn areas are installed and after irrigation system is operable.

C. Protect work and materials from damage due to construction operations by other contractors and trades and by vandalism. Maintain protection during installation.

1.06 SAMPLES AND TESTS
A. The Owner reserves the right to take and analyze samples of materials for conformity to specifications at any time. The Contractor shall furnish samples upon request by Owner. Rejected materials shall be immediately removed from the site at Contractor's expense. Cost of testing of materials not meeting specifications shall be paid by the Contractor.

B. Refer to provided horticultural soils report for bid purposes. Contractor to provide a horticultural soils report of existing landscape soil after rough grade and submitted topsoil including information on soil texture, filtration rate, nutrient levels and organic matter. Include recommendation for amendment to be added to existing landscape soil and topsoil to mitigate any deficiencies.

1.07 GUARANTEE AND REPLACEMENT
A. Guarantee: All plant material and other materials installed under the Contract shall be guaranteed against any and all poor, inadequate or inferior materials and/or workmanship for a period of one (1) year. Any plant found to be dead or not in a satisfactory or healthy condition due to faulty materials, workmanship, or improper maintenance as determined by the, shall be replaced by the Contractor at his expense.

B. Replacement: Any materials found to be dead, missing or not in a satisfactory or healthy condition during the Contract period shall be replaced immediately. The Owner shall be the sole judge as to the condition of material. Material to be replaced within the guarantee period shall be replaced by the Contractor within fifteen (15) days of written notification by the Owner. All replacement materials and installation shall comply with the Drawings and Specifications.

PART 2 - PRODUCTS

2.01 GENERAL
All materials shall be of standard, approved and first-grade quality and shall be in prime condition when installed and accepted. Any commercially processed or packaged material shall be delivered to the site in the original unopened container bearing the manufacturer's guaranteed analysis. The Contractor shall supply the Owner with a sample

Page 162 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-4
of all supplied materials accompanied by analytical data from an approved laboratory source illustrating compliance of bearing the manufacturer's guaranteed analysis.

2.02 PRODUCTS
A. Soil Conditioner

1. Gro-Power Plus: Humus (bacteria included based fertilizer and soil conditioner with soil penetrant shall consist of the following percents by weight:
5 % nitrogen
3 % phosphoric acid
1 % potash
50 % humus
15 % humic acids
B. Soil Amendment

1. Nitrogen Stabilized Shavings: 0.56 to 0.84% N based on dry weight for fir bark mulch, treated with relative form of nitrogen (NH3).
a. Particle Size: 95% - 100% passing 6.35 mm standard sieve. 80% - 100% passing 2.33 mm standard sieve.
b. Salinity: The saturation extract conductivity shall not exceed 3.5 mil/centimeter at 25 degrees (25°) centigrade as determined by saturation extract method.
c. Iron Content: Minimum 0.08% dilute acid soluble Fe on dry weight basis. d. Ash: 0 - 6.0% (dry weight)
C. Fertilizer

1. Fertilizer: Shall be Gro-Power Plus (bacteria included) with soil penetrant and shall consist of the following percents by weight:
5% nitrogen
3% phosphoric acid
1% potash
50% humus
15% humic acid

2. Fertilizer: Shall consist of the following percents by weight:
6% nitrogen
20% phosphoric acid
20% potash

3. Ammonia Sulfate: Shall consist of the following percents by weight:

Page 163 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-5
21% nitrogen
0% phosphoric acid
0% potash

4. Turf Starter Fertilizer: Shall consist of the following percents by weight:

16% nitrogen
6% phosphoric acid
8% potash

5. Planting Tablets: Slow-release 21 gram tablets as manufactured by Agriform or approved equal, containing the following percent-ages of nutrients by weight:
20 % nitrogen
10 % phosphoric acid
5 % potash

6. Inoculum: Shall be Grow-Life Mycorrhizal Inoculum / Soil Conditioner D. Imported Soil

1. Imported soil shall be obtained from a source approved by the Owner’s Representative.

2. Imported topsoil shall be of friable sandy-loam texture free of refuse, roots, heavy or stiff clay, rocks, sticks, brush or other deleterious materials. Topsoil acidity range (pH) shall be between 6.5 to 7.5 containing a minimum of 4% and a maximum of 25% organic matter. Topsoil shall be free of all noxious weeds.

Topsoil samples and analysis shall be submitted to the Owner’s Representative for approval prior to delivery of any soil to the project site. Should the Owner’s Representative reject any portion of the delivered soil, for any reason, it shall be removed immediately at no cost to the Owner.

3. Topsoil, if rejected, shall be amended to meet specifications. Submit amended topsoil analysis to Owner’s Representative for verification.

4. See also Landscape Grading Section 02260.

E. Plant Material

1. The plant material indicated on the Drawings by the listed names shall conform to "Standardized Plant Names", second edition, except for names not covered there in, the established customs of the nursery trade is followed. All plants shall be true to name, above one of each bundle or lot shall be tagged with the name and size of the plant, in accordance with the standards of practice recommended by the American Association of Nurserymen. All plant materials shall meet the specifications of Federal, State, County, and municipal laws, requiring observation for plant diseases and insect infestations. Plants shall be symmetrical,

Page 164 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-6
typical for variety and species, sound, healthy, vigorous, free from plant diseases, insect pests or other eggs, and shall have healthy, normal root systems, while filling their containers, but not to the point of being root bound. Use only plant materials that are first class representative of the species and cultivars specifies and that conform to all State and local laws governing the sale, transportation, and observation of plant materials. Plants shall have straight, single trunks, unless otherwise specified on the plans. Those specified to be multi-trunk shall have at least three (3) main leaders from the base. Any and all plants that have any encircling roots (not root bound) shall have root balls lightly slashed on a minimum of three (3) sides to stop encircling root growth. The height and spread of all plant materials shall be measured with branches in their normal position.

Sizes of plants shall be as stated on the plant list, five and fifteen (5 & 15) gallon can container stock shall have been grown in that container not less than six (6) months, but shall not have been overgrown in the containers so as to have become root bound.

2. The size of the plants will correspond with that normally expected for species and variety of commercially available nursery stock or as specified in the Special Conditions or Drawings. The minimum acceptable size of all plants, measured before pruning with the branches in normal position, shall conform with the measurements, if any, specified on the Drawings in the list of plants to be furnished. Plants larger in size than specified may be used with the approval of the Owner, but if the use of larger plants is approved, the ball of earth or spread of roots for each plant will be increased proportionally. Plant material shall conform to the following Specifications for container stock:

SHRUBS

SIZE TYPE EXAMPLE HEIGHT SPREAD CALIPER
1 Gal. low growing Pitt. tobira - etc. 8-10" 6-8"
1 Gal. tall growing Pitt. eugen. - etc. 10-12" 6-8"
5 Gal. low growing Pitt. tobira - etc. 15-18" 15-18"
5 Gal. tall growing Pitt. eugen. - etc, 24-30" 15-18"
15 Gal. low growing Pitt. tobira - etc. 30-36" 30-36"
15 Gal. tall growing Pitt eugen. - etc. 42-48" 36-42"
TREES
5 Gal. slow growing Quercus - etc. 5-6' 12-18" 1/4 - 1/2" 5 Gal. fast growing Euc. - Prunus - etc. 6-7' 12-18" 1/2 - 3/4" 15 Gal. slow growing Quercus - Pyrus - etc. 7-8' 24-30" 3/4 - 1" 15 Gal. fast growing Euc. - Prunus - etc. 8-10' 30-36" 1- 1 1/4" 24" Box slow growing Quercus - Pyrus - etc. 8-10' 3-4' 1 1/2-1 3/4" 24" Box fast growing Euc. - Prunus - etc. 10-12' 4-5' 1 3/4-2 1/2 30" Box slow growing Quercus - Pyrus - etc. 12-14' 6-7' 2 1/2 - 3" 30" Box fast growing Euc. - Prunus - etc. 12-14' 6-7' 2 1/2 - 3" 36" Box slow growing Quercus - Pyrus - etc. 14-16' 8-10' 2 1/2 - 3" 36" Box fast growing Euc. - Prunus - etc. 14-16' 8-10' 2 1/2 - 3" 36" Box fast growing Euc.- Prunus - etc. 14-16' 8-10' 2 1/2 - 3"

3. All plants not conforming to the requirements herein specified, shall be considered defective and such plants, whether in place or not, shall be marked as rejected and immediately removed from the site of the work and replaced with

Page 165 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-7
new plants at the Contractor's expense. The plants shall be of the species, variety, size, and condition specified herein or as shown on the Drawings. Under no conditions will there be any substitution of plants or sizes listed on the plans, except with the expressed written approval of the Owner.

4. At no time shall trees or plant materials be pruned, trimmed or topped prior to delivery and any alteration of their shape shall be conducted only with the approval and when in the presence of the Owner and/or as noted on the Planting Specifications.

5. Nursery Grown and Collected Stock
a. Plant materials shall conform with the best edition of ANSI Z60.1-1990 American Standard for Nursery Stock.
b. Grown under climatic conditions similar to those in locality of project. c. Container-grown stock in vigorous, healthy condition, not root bound or with root system hardened off.
d. Use only linear stock plant material which is well established in removable containers or formed homogeneous soil sections.

6. Ground Cover: Ground cover plants shall be grown in flats, peat pots, or taken as cuttings, as indicated on the plans. Flat grown plants (rooted cuttings) shall remain in those flats until transplanting. The flat's soil shall contain sufficient moisture so that it will not fall apart when lifting the plants. If plants from peat pots are used, the pots shall be protected at all times prior to planting to prevent unnecessary drying of the rootball.

F. Tree Staking Material

1. Stakes for Tree Support
a. Wood Tree Stakes: Lodge pole pine stakes full-length treated with copper naphthanate. Minimum nominal size: two inches in diameter x eight feet (2"x 8') long and pointed at one (1) end (adjust length to fit tree). Stakes shall be free from knots, checks, splits, or disfigurements.

2. Ties
a. 24" length cinch tie as manufactured by V.I.T. Company 1-714-871-2309 or approved equal.

3. Duckbill Total System tree anchor kit with white vinyl coated cable by Foresight Products, Inc., 1-800-325-5360.
a. Safety sleeve one-half (1/2) inch black polyethylene tubing.

G. Mulch

Page 166 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-8

1. Mulch shall be walk-on fir bark mulch as manufactured by Lassen Forest Products, Red Bluff CA., 1-800-621-8557 or approved equal.

2. The mulch shall consist of fir bark mulch with a particle range of three-quarter to one and one-half (3/4 -1 1/2) inch in diameter. Shredded redwood bark ("gorilla hair") is not acceptable.

H. Sod

1. Sod varieties shall be as specified on Drawings. Sod shall be healthy, weed free, and obtained from a certified sod growing nursery or farm.

2. All sod shall be cut within twenty-four (24) hours prior to installation.

L. Fungicide

1. "Subdue" (Cibiba-Geigy) or approved equal.

2. Sod Planting – Fungicide labeled for fungi known to effect turf grass in Northern Central Valley or Northern California.

M. Pre-emergent

1. Pre-emergent, as approved by the Owner’s Representative - prevent annual weed development in hydromulch applications. Do not use in hydromulch mixes incorporating annual wildflower or grass seeds.

N. Weed Control

1. Use Enide (Upjohn), Dymid (Elanco Products Co.), Treflan, Eptan, Surflan or approved equal.

O. Root Barrier

1. By Deep Root Corp. model numbers UB-18-2 or approved equal.

P. Miscellaneous Materials

1. Sand: wash river sand or equal.

2. Tree wound paint: as approved. Morrison Tree Seal, Cabot Tree Paint, or approved equal.

PART 3 - EXECUTION

3.01 OBSERVATION

Page 167 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-9
The Owner’s Representative to verify that topsoil has been imported, and final grades have been established prior to beginning planting operations. The Owner to observe, shrubs and liner stock plant material for injury, insect infestation and trees and shrubs for improper pruning. Do not begin planting of trees until deficiencies are corrected or plants replaced.

3.02 LAYOUT OF PLANTING AREAS
A. Stake or mark with lime locations for plants and outline of planting beds on ground.

Do not begin excavation until plant locations and plant beds are acceptable to the Owner’s Representative. The irrigation system shall be operational and approved prior to planting.

B. Locations for plants and outlines of areas to be planted shall be marked on the ground by the Contractor before any plant pits are dug. All such locations shall be approved by the Owner’s Representative. If an underground construction or utility line is discovered prior to work, other locations for planting may be selected by the Owner’s Representative.

3.03 INSTALLATION
A. Preparation of planting areas:

1. Amend soil per recommendations of horticultural soils report provided by contractor.

2. All soil areas shall be compacted and settled by application of heavy irrigation to a minimum depth of twelve (12) inches.

3. After grading and de-rocking, and prior to planting, incorporate amendments in Section 02905 Paragraph 2.02 and per soils report to a depth of six (6) inches.

4. At time of planting, the top six (6) inches of all areas to be planted shall be free of stones, stumps, or other deleterious matter one (1) inch in diameter or larger, and shall be free from all wire plaster, or similar objects that would be a hindrance to planting and maintenance. All rock larger than 1 inch to be removed by mechanical means, either by sieve for loose rock and by heavy equipment if solid bedrock.

B. Final Grades

1. Finished grading shall insure proper drainage of the site. Conform to specification SECTION 02260 - LANDSCAPE GRADING.

2. The following areas shall be graded so that the final grades shall be established below adjacent paved areas, sidewalks, valve boxes, clean outs, area drains, curbs, etc. as follows:
a. Shrub/ground cover areas: 2-1/2 inches

Page 168 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-10
b. Sod areas: 1-1/2 inches

3. Surface drainage shall be away from all building foundations, where applicable.

4. Dispose of excess or unacceptable soil from the site.

3.04 PLANT INSTALLATION
A. General

1. Actual planting shall be performed during those periods when weather and soil conditions are suitable and in accordance with locally accepted practice, as approved by the Owner.

2. Only as many plants as can be planted and watered on that same day shall be distributed in a planting area.

3. Container shall be opened and plants shall be removed in such a manner that the ball of earth surrounding the roots is not broken and they shall be planted and watered as herein specified immediately after removal from the containers.

Containers shall not be opened prior to placing the plants in the planting area.

B. Layout of Major Plantings

1. Locations for plants and outlines of areas to be planted shall be marked on the ground by the Contractor before any plant pits are dug. All such locations shall be approved by the Owner. If an underground construction or utility line is discovered prior to work, other locations for planting may be selected by the Owner.

C. Planting of Trees and Shrubs

1. Excavation for planting shall include the stripping and stocking of all acceptable topsoil encountered within the areas to be excavated for trenches, tree holes, plant pits and planting beds.

2. Excess soil generated from the planting holes and not used as backfill or in establishing the final grades shall be removed from the site.

3. Excavating for Planting:
a. Shape
i. Vertical sides and flat bottom.
ii. Plant pits to be square for box material, circular for canned material. iii. Scarify sides and bottom of each pit.
b. Size: All trees and shrubs shall have planting pits dug twice the diameter of the root ball. Backfill around the root ball with prepared backfill mix.

Page 169 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-11

4. Protect all areas from excessive compaction when trucking plants or other materials to planting site.

5. Install Root Barrier at all locations where tree is within 5’-0” of concrete or other hardscape.

6. Can Removal
a. Cut cans on two (2) sides with an acceptable can cutter. b. Do not injure the root ball.
c. Do not cut cans with spade or ax.
d. Carefully remove plants without injury or damage to root ball. e. After removing plant, manually scarify root ball to loosen perimeter roots.

7. Box Removal
a. Remove bottom of plant boxes before planting.
b. Remove sides of box without damage to root ball after positioning plant and partially backfilling.

8. Center plant in pit.

9. Face plants with fullest growth into prevailing wind.

10. Set plant plumb and hold rigidly in position until soil has been tamped firmly around ball roots.

11. Remainder of planting pit shall be backfilled with:
a. Amended soil per Soil Analysis and Drawing Detail.
b. Grow Power-Plus per rate of manufacture’s recommendations. c. Specified type and quantity of planting tablets

12. All plants which settle shall be raised to the correct level. After the plant has been placed, additional backfill shall be added to the hole to cover approximately onehalf (1/2) of the height of the root ball. Water shall be added to the top of the partly filled hole to thoroughly saturate the root ball and adjacent soil.

13. After the water has completely drained, planting tablets shall be placed adjacent to but not in contact with root ball:

One (1) tablet per 1-gallon container
Two (2) tablets per 5-gallon container

Page 170 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-12
Three (3) tablets per 15-gallon container
Four (4) tablets per 24" box
Five (5) tablets per 30" box
Six (6) tablets per 36" box
Seven (7) tablets per 42" box
Eight (8) tablets per 48" box and larger box sizes

14. The remainder of the hole shall be backfilled.

15. After backfilling an earthen basin shall be constructed around each plant. Each basin shall be of a depth sufficient to hold at least two (2) inches of water. Basin shall be of a size suitable for the individual plant. In no case shall the basin for fifteen (15) gallon plant be less than four (4) feet in diameter; a five (5) gallon plant less than three (3) feet in diameter. The basins shall be constructed of amended backfill materials and shall not be constructed for trees in turf areas.

Edge of planter to be 2-1/2” below finish grade to allow for bark and prevent spilling onto sidewalk and existing parking lot.

16. Pruning: Pruning shall be limited to the minimum necessary to remove injured twigs and branches and to compensate for loss of roots during transplanting, but never to exceed one-third (1/3) of the branching structure. Upon approval of the Owner, pruning may be done before delivery of plant, but not before plants have been observed and approved. Cuts over three-quarter (3/4) inch in diameter shall be painted with tree wound paint.

17. Staking and Guying

a. Staking of all trees shall conform to tree staking and tree guying details. b. Flagging: All guys are to be flagged 90% of the wire length and shall be covered with black polyethylene one-half (1/2) inch diameter tube. c. One (1) tree of each size shall be staked and approved by the Owner prior to continued staking.

D. Planting of Ground Cover

1. Ground cover shall be planted in straight rows and evenly spaced, unless otherwise noted, and at intervals called out in the Drawings. Triangular spacing shall be used unless otherwise noted on the Drawing.

2. Each rooted plant shall be planted with its proportionate amount of flat soil or in a peat pot in a manner that will insure minimum disturbance of the root system, but in no case shall this depth be less than two (2) nodes. To avoid drying out, planting shall be immediately irrigated after planting until the entire area is soaked to the full depth of each hole, unless otherwise noted on the Drawing.

Page 171 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-13

3. Care shall be exercised at all times to protect the plants after planting. Any damage to plants by trampling or other operations of this Contract shall be repaired immediately.

E. Sod Planting

1. Soil Preparation: As per paragraph 3.03 A.

2. Grading and Rolling: Carefully smooth all surfaces to be sodded. Roll area to expose soil depressions or surface irregularities. Regrade as required.

3. Fertilizing: Spread turf fertilizer (16-6-8) onto the soil evenly at the rate of four (4) pounds per 1,000 square feet of lawn area.

4. Laying sod: Lay first strip of sod along a straight line (use a string in irregular areas). Butt joints tightly, but do not overlap edges. On second strip, stagger joints. Use a sharp knife to cut sod to fit curves, edges and irrigation heads.

5. Watering: Do not lay whole lawn before watering. When a conveniently large area has been sodded, water lightly to prevent drying. Continue to lay sod and to water until installation is complete.

6. Rolling sod: After laying all sod, roll lightly to eliminate irregularities and to form good contact between sod and soil. Avoid a very heavy roller or excessive initial watering which may cause roller marks.

7. Irrigation: Water thoroughly the completed lawn surface. Soil should be moistened at least eight (8) inches deep. Repeat irrigation at regular intervals to keep sod moist at all times until rooted. After sod is established, decrease frequency and increase amount of water per application as necessary.

8. Replacement: Replace all dead or dying sod with equal material as directed by the Owner.

H. Weed Control

1. Apply weed control to all non-turf areas after completion of all planting and one (1) complete watering (to "set" plants).

2. Apply as per manufacturer's specifications.

I. Fungicide

1. Apply fungicide to all turf following installation

2. Apply as per manufacturer’s specifications.

3. After initial application apply at two-week intervals as required to prevent fungus until end of Contract period.

Page 172 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-14
J. Hardpan Conditions

1. Where hardpan exists, whether it is in the form of caliche or other impervious clay, and it is within the top two-and-one-half feet (2-1/2') of soil, use powered equipment to break through completely at each plant location to allow drainage and root growth. Remove hardpan at least one-and-one-half feet (1-1/2') greater than the rootball diameter of plant. Backfill with soil mix as specified.

2. Where hard pan is within the first twelve (12) inches of soil, it shall be completely penetrated for all trees and shrubs.

3.05 OBSERVATION SCHEDULE
A. The Contractor shall be responsible for notifying the Owner in advance for the following observations according to the time indicated:

1. Pre-construction conference - 7 days.

2. Rough grade review - 48 hours.

3. Controller and backflow preventer installation review - 48 hours.

4. Irrigation pressure line and lateral line installation and testing - 48 hours.

5. Irrigation sprinkler coverage test - 48 hours.

6. Finish grade review - 48 hours.

7. Plant material review - 48 hours.

8. Plant layout review - 48 hours.

9. Soil preparation, plant layout, and planting operations. One (1) tree with each type of specified shall be approved prior to planting of trees - 48 hours.

10. End of landscape installation - 48 hours.

11. Final Acceptance - 48 hours
B. No site visits shall commence without all items noted in previous Observation Reports either completed or remedied, unless such compliance has been waived.

Failure to accomplish punch list tasks or prepare adequately for desired observations shall make the Contractor responsible for reimbursing the Owner at his current billing rates per hour, plus transportation costs.

3.06 CLEAN UP

Page 173 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-15
After all planting operations have been completed; remove all trash, excess soil, empty plant containers or rubbish from the property. All scars, ruts or other marks in the ground caused by this work shall be repaired and the ground left in a neat and orderly condition throughout the site. The Contractor shall pick-up all trash resulting from this work no less frequently than each Friday before leaving the site, once a week, and/or the last working day of each week. All trash shall be removed completely from the site. The Contractor shall leave the site area broom-clean and shall wash down all paved areas within the Contract area, leaving the premises in a clean condition acceptable to the Owner.

END OF SECTION

Page 174 of 412 ends

General Vang Pao Park Section 02905
February 2026 Landscape Installation
02905-16

Page 175 of 412 ends

General Vang Pao Park Section 030000
February 2026 Concrete

030000-1
SECTION 030000

CONCRETE
PART 1 - GENERAL

1.1 WORK INCLUDED
A. Contractor shall furnish all labor, tools, and equipment for the construction of reinforced cast-in-place concrete.

B. This section includes basic finishing and curing methods, accessory control, and expansion and contraction joint devices.

1.2 RELATED WORK
A. The following is a list of specifications which may be related to this section:

1. Section 31000, Concrete Forming and Accessories (ACI 347)

2. Section 02764, Pavement Joint Sealants.

3. Section 312000, Earthwork.

4. Section 328400, Planting Irrigation.

1.3 REFERENCES
A. The following is a list of standards which may be referenced in this section:

1. ASTM International (ASTM):
a. C33, Standard Specification for Concrete Aggregates. b. C94/C94M, Standard Specification for Ready-Mixed Concrete. c. C150, Standard Specification for Portland cement.
d. C260, Standard Specification for Air-entraining Admixtures for Concrete. e. C494/C494M, Standard Specification for Chemical Admixtures for Concrete.
f. C979, Standard Specification for Pigments for Integrally Colored Concrete. g. C1059, Standard Specification for Latex Agents for Bonding Fresh to Hardened Concrete.

2. American Concrete Institute (ACI):
a. 211, Standard Practice for Selecting Proportions for Concrete. b. 301, Specifications for Structural Concrete.

Page 176 of 412 ends

General Vang Pao Park Section 030000
February 2026 Concrete

030000-2
c. 305.1, Specification for Hot Weather Concreting.
d. 306.1, Specification for Cold Weather Concreting.
e. 309, Standard Practice for Consolidating Concrete.
f. 504, Guide to Joint Sealants.

1.4 SUBMITTALS
A. Provide product data on the following:

1. Ready-mixed concrete mix designs.

2. Fly ash.

3. Admixtures (such as air-entraining and water-reducing admixtures).

4. Form release agents.

5. Bonding agents.

6. Colorant.

7. Grout.

B. Shop Drawings: Provide shop drawings that indicate formwork, dimensions, reinforcement, accessories and control and expansion joint layout.

C. Record Drawings: Provide accurate locations, measured from two permanent visible locations, all embedded utilities, sleeves, and components that will be concealed from view upon completion of concrete work.

1.5 COORDINATION
A. Coordinate with other trades affecting or affected by work of this section.

B. Verify that pipe sleeving and other conduits, of sizes and types specified, are installed as required prior to placing concrete.

1.6 QUALITY ASSURANCE
A. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.

B. Installer Qualifications: A qualified installer who employs project personnel qualified as ACI-certified Flatwork Technician and Finisher and/or a supervisor who is an ACIcertified Concrete Flatwork Technician.

Page 177 of 412 ends

General Vang Pao Park Section 030000
February 2026 Concrete

030000-3
C. Testing Agency Qualifications: An independent agency qualified according to ASTM C 1077 and ASTM E 329 for testing indicated.

D. Personnel conducting field tests shall be qualified as ACI Concrete Field-Testing Technician, Grade 1, according to ACI CP-1 or an equivalent certification program.

E. Personnel performing laboratory tests shall be ACI-certified Concrete Strength Testing Technician and Concrete Laboratory Testing Technician, Grade I. Testing agency laboratory supervisor shall be an ACI-certified Concrete Laboratory Testing Technician, Grade II.

1.7 MOCK UP
A. Cast concrete mock up to demonstrate typical joints, surface finish, texture, tolerances, and standard of workmanship.

B. Mock up shall be a minimum 25 sq. ft. for formed surface in the location indicated or, if not indicated, as directed by Owner’s Representative.

C. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion. Demolish and remove concrete mockups when directed by Owner’s Representative.

1.8 DELIVERY, STORAGE, AND HANDLING
A. The ready-mixed concrete truck driver shall provide the batch ticket to Owner’s Representative at the time of concrete delivery. The ticket shall summarize the following information legibly in an easily discernible table:

1. Weight in pounds of all materials, excepting the water reducing and air entraining agents which shall be in ounces.

2. Cubic yards batched.

3. The ratio of water to cementitious (W/C) materials ratio.

4. Temperature of the concrete at the time it was batched.

5. Time of batching.

6. Free moisture in the fine and coarse aggregates in percent of weight of aggregate.

7. Gallons of water that may be added at the site without exceeding the permissible W/C ratio.

8. Ratio of colorants to cementitious materials ratio.

Page 178 of 412 ends

General Vang Pao Park Section 030000
February 2026 Concrete

030000-4

9. Concrete Mix Design Number.

1.9 FIELD CONDITIONS
A. Cold-Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.

1. When average high and low temperature is expected to fall below 40 deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.

2. Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials.

3. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.

B. Hot-Weather Placement: Comply with ACI 301 and as follows:

1. Maintain concrete temperature below 90 deg F at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option.

2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete.

Keep subgrade uniformly moist without standing water, soft spots, or dry areas.

PART 2 - PRODUCTS

2.1 GENERAL REQUIREMENTS
A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.

B. Use a qualified independent testing agency for preparing and reporting proposed mixture designs based on laboratory trial mixtures.

C. Installation of concrete other than approved mixes shall be replaced at the expense of the Contractor.

2.2 MATERIALS
A. Acquire cement and aggregate from the same source for all work.

Page 179 of 412 ends

General Vang Pao Park Section 030000
February 2026 Concrete

030000-5
B. Cement: Cement shall be Portland cement Type II, unless otherwise indicated on the Drawings.

C. Aggregate:

1. Fine Aggregate: Fine aggregate shall consist of hard, strong, durable particles complying with the provisions of ASTM C33.

2. Coarse Aggregate: Coarse aggregate shall conform to the provisions of ASTM C33. Aggregate shall be crushed aggregate or angular screened natural aggregate.

Hydraulic - cement aggregate is unacceptable.

D. Water: Water shall be clean and free from injurious amounts of oils, acids, alkalis, salts, organic materials, or other substances that may be deleterious to concrete or steel.

Mixing water for prestressed, pretensioned and prestressed post-tensioned concrete or for concrete which will contain aluminum embedments shall not contain deleterious amounts of chloride ion.

E. Admixtures: Admixtures to be used in concrete shall be subject to prior acceptance by Owner’s Representative. The admixture shall maintain the same composition and performance throughout the Work as the product used in the concrete proportions established in accordance with ACI 211. Admixtures containing chloride ions shall not be used.

1. Air Entrainment:
a. An air-entraining agent shall be used in all concrete. The agent used shall conform to ASTM C260.
b. Unless otherwise shown on the Drawings, the amount of airentraining agent used in each concrete mix shall be such as will affect the entrainment of the percentage of air shown in the following tabulation in the concrete as discharged from the mixer or pumper discharge hose if applicable. Table 1 is applicable for concrete strengths less than five thousand (5,000) psi

Table 1
Nominal Max.

Aggregate Size (Inch)
Average Air Content
(Percent)
Severe Exposure Moderate Exposure
3/8 7-1/2 ± 1-1/2 6 ± 1-1/2
3/4 6 ± 1-1/2 5 ± 1-1/2
1-1/2 5-1/2 ± 1=1/2 4-1/2 ± 1-1/2

Page 180 of 412 ends

General Vang Pao Park Section 030000
February 2026 Concrete

030000-6
c. The level of exposure shall be determined by Owner’s Representative. d. When a batch of concrete delivered to the Project does not conform to the minimum specified air content, an air-entraining admixture may be added, one (1) time only for the batch, at Contractor’s option prior to consideration for rejection. After the admixture is added, the concrete shall be remixed for a minimum of twenty (20) revolutions of the mixer drum at mixing speed.

The concrete shall then be retested and if found acceptable, may be placed in accordance with the Specifications.

2. Water Reducing, Set-Controlling Admixture: Contractor shall use a “midrange” water reducing, set controlling admixture, Polyheed 997, or equal. The waterreducing admixture shall be used in all concrete and shall conform to ASTM C494/C494M, specifically Types A, B, C, D, and E.

3. Finely Divided Mineral Admixtures (Fly Ash): Mineral admixtures shall be limited to fly ash conforming to ASTM C618, Class C or Class F. Class C fly ash is not permitted where sulfate resistant cement is required.

F. Bituminous Coating: Bituminous Coating for aluminum pipes will be in accordance with AASHTO M-190 Type A.

G. Epoxy Bonding Agent:

1. Master Builders; Concresive Liquid (LPL).

2. Master Builders; Concresive Standard Liquid.

2.3 COMPRESSIVE STRENGTH
A. Concrete compressive strength requirements consist of a minimum strength that must be obtained before various loads of stresses are applied to the concrete and, for concrete designated by strength, a minimum strength at the age of twenty-eight (28) days. Unless otherwise shown on the DRAWINGS, the twenty-eight (28) day compressive strength of structural concrete shall be a minimum of four thousand five hundred (4,500) psi.

B. The mix shall be designed for required strengths in accordance with ACI 301. The ratio of water to the sum of concrete plus pozzolan shall not exceed 0.45 by weight for durable, watertight, concrete. The amount of fly ash in the mix shall be between fifteen and twenty percent (15 and 20%) by weight of the total cementitious materials.

C. Unless otherwise permitted or specified in the DRAWINGS, the concrete shall be proportioned and produced to have a slump not to exceed four (4) inches or less than two and one-half (2-1/2) inches. Concrete not consolidated by internal vibration shall be proportioned to have a slump not to exceed five and one-half (5-1/2) inches or less than four (4) inches.

Page 181 of 412 ends

General Vang Pao Park Section 030000
February 2026 Concrete

030000-7

2.4 SOURCE QUALITY CONTROL
A. Batching:

1. Measuring and batching of materials shall be done at a batching plant.

2. Portland Cement:
a. Either sacked or bulk cement may be used. No fraction of a sack of cement shall be used in a batch of concrete unless the cement is weighed. Bulk cement shall be weighed on scales separate and distinct from the aggregate hopper or hoppers. Batching shall be such that the accuracy of batching shall be plus or minus one percent of the required weight.

3. Water:
a. Unless water is to be weighed, the water-measuring equipment shall include an auxiliary tank from which the measuring tank shall be filled. In lieu of the volume method, Contractor shall be permitted to use a water-metering device.

4. Aggregates:
a. Aggregates shall be handled from stockpiles or other sources to the batching plant in such a manner as to secure a uniform grading of the material.

Aggregates that have become segregated, or mixed with earth or foreign material, shall not be used. Batching shall be so conducted as to result in the weights of material required for each type aggregate within a tolerance of two percent (2%).
b. Free water contents of the coarse and fine aggregates shall be continuously tested and concrete mixture adjusted for moisture conditions of the aggregate in order to meet the designated water/cement ratio.

5. Fine Aggregate:
a. The proportion of fine aggregate shall be between thirty-six and forty-four percent (36 and 44%) by volume of the total aggregates in the concrete.

B. Mixing:

1. Ready-mixed concrete shall be either “central mixed” or “shrink mixed” concrete as defined in ASTM C94/C94M. “Truck mixed” concrete as defined in ASTM C94/C94M shall not be permitted. Mixing time shall be measured from the time water is added to the mix, or cement contacts the aggregate. All concrete shall be homogeneous and thoroughly mixed, and there shall be no lumps or evidence of undispersed cement. Mixers and agitators, which have an accumulation of hard concrete or mortar, shall not be used. Ready-mixed concrete shall be mixed and transported in accordance with ASTM C94/C94M.

Page 182 of 412 ends

General Vang Pao Park Section 030000
February 2026 Concrete

030000-8

2. The temperature of mixed concrete, immediately before placing shall not be less than fifty degrees Fahrenheit (50°F) or more than ninety degrees Fahrenheit (90°F). Aggregates and water shall be heated or cooled as necessary to produce concrete within these temperature limits. Neither aggregates nor mixing water shall be heated to exceed one hundred fifty degrees Fahrenheit (150°F).

3. The time elapsing from the time water is added to the mix (or the cement comes in contact with aggregate) until the concrete is deposited in place at the site of the WORK shall not exceed sixty (60) minutes when the concrete is hauled in nonagitating trucks, nor more than ninety (90) minutes when hauled in truck mixers or truck agitators.

4. The batch shall be so charged into the drum that a portion of the mixing water shall enter in advance of the cement and aggregates. The flow of water shall be uniform and all water shall be in the drum by the end of the first one-quarter (1/4) of the specified mixing time.

5. Cement shall be charged into the mixer by means that will not result in loss of cement because of the effect of wind, or in accumulation of cement on surfaces of hoppers or in other conditions which reduce or vary the required quantity of cement in the concrete mixture.

C. Transporting Mixed Concrete; Mixed Concrete or Truck Mixers:

1. Transporting of mixed concrete shall conform to ASTM C94/C94M.

2. Truck agitators shall be loaded not to exceed the manufacturer’s guaranteed capacity. They shall maintain the mixed concrete in a thoroughly mixed and uniform mass during hauling.

3. No additional mixing water shall be incorporated into the concrete during hauling or after arrival at the delivery point, unless approved by Owner’s Representative.

If additional water is to be incorporated into the concrete at the site, the drum shall be revolved not less than thirty (30) revolutions at mixing speed after the water is added and before discharge is commenced. One (1) addition of water at the site to adjust mix workability is permitted but the maximum water cement ratio shall not be exceeded.

4. Contractor shall furnish a water-measuring device in good working condition, mounted on each transit mix truck, for measuring the water added to the mix on the site. All water tanks on transit mix trucks shall be filled prior to being batched and arrive at the construction site one hundred percent (100%) full.

5. Each load of ready mixed concrete delivered at the job shall be accompanied by the ticket in accordance with Article Delivery, Storage, and Handling.

Page 183 of 412 ends

General Vang Pao Park Section 030000
February 2026 Concrete

030000-9
PART 3 - EXECUTION

3.1 PREPARATION
A. Prior to placing concrete, Contractor shall remove all debris and thoroughly dampen the surfaces that may be in contact with the concrete to be placed.

B. Contractor shall use compressed air from an air compressor to blow out construction debris and dirt at the bottom of members to be placed such as walls, beams, and columns, prior to final placement of forms that may obscure any joint. Contractor shall demonstrate to Owner’s Representative that all debris, such as concrete particles, saw dust, loose tie wire, bar tags, tape, trash and dirt, have been thoroughly removed.

C. All surfaces of forms and embedded materials that have become encrusted with dried mortar or grout from concrete previously placed shall be cleaned of all such mortar or grout before the surrounding or adjacent concrete is placed.

D. No concrete shall be placed until all formwork, reinforcement, installation of parts to be embedded, bracing of forms, and preparation of surfaces involved in the placing have been reviewed by Owner’s Representative.

E. Immediately before placing concrete, all surfaces upon or against which the concrete is to be placed shall be free from standing water, mud, debris, or loose materials.

F. No concrete shall be placed when form surfaces that may be in contact with the concrete, reinforcement, embedded items or sub-base is less than thirty-two degrees Fahrenheit (32°F). When the mean daily outdoor temperature is less than forty degrees Fahrenheit (40°F), the temperature of the concrete shall be maintained between fifty degrees Fahrenheit (50°F) and seventy degrees Fahrenheit (70°F) for the required curing period. When necessary, arrangements for heating, covering, insulating, or housing the concrete work shall be made in advance of placement and shall be adequate to maintain the required temperature without injury as a result of concentration of heat.

Combustion heaters shall not be used during the first twenty-four (24) hours unless precautions are taken to prevent exposure of the concrete to exhaust gases which contain carbon dioxide.

G. Concrete shall not be placed against forms exposed to heating unless the temperature of the forms is first cooled to less than or equal to ninety degrees Fahrenheit (≤90°F).

3.2 PLACEMENT
A. Placement shall conform to ACI 301, Chapter 8, ACI 304, ACI 306.1, ACI 305.1, and ACI 309. No concrete shall be placed in water except with the written permission of Owner’s Representative. The surfaces of absorptive materials against or upon which concrete is to be placed shall be moistened thoroughly so that moisture will not be drawn from the freshly placed concrete. The concrete shall be placed by equipment that

Page 184 of 412 ends

General Vang Pao Park Section 030000
February 2026 Concrete

030000-10
will prevent segregation or loss of ingredients. The stream of concrete shall not be allowed to separate by permitting it to fall freely over rods, spacers or other embedded materials.

B. Unless otherwise called out in these Specifications or shown on the Drawings, the placement lift depth of concrete in walls shall be limited to two (2) feet or less to minimize surface defects such as air voids that can form on concrete surfaces. Lift depths shall be limited to one (1) foot if, in the opinion of Owner’s Representative, the quality of the finish is unacceptable at the two- (2- ) foot lift depth.

C. Concrete shall be placed so as to avoid segregation of the materials and the displacement of the reinforcement.

D. Concrete shall not be dropped more than five (5) feet unless confined by closed chutes or pipes. Care shall be taken to fill each part of the form by depositing the concrete as near final position as possible. The coarse aggregate shall be worked back from the forms and worked around the reinforcement without displacing the bars. After initial set of the concrete, the forms shall not be jarred and strain shall not be placed on the ends of projecting reinforcement.

E. Where steep slopes are required, the chutes shall be equipped with baffle boards or be in short lengths that reverse the direction of movement.

F. Concrete shall not be pumped through aluminum alloy pipe.

G. All chutes, troughs, and pipes shall be kept clean and free from coatings of hardened concrete.

3.3 CONSOLIDATION
A. Concrete vibrators for consolidating concrete shall be two and one-half inch (2-1/2") diameter “high cycle” vibrators with a frequency under load of eight thousand (8,000) to ten thousand four hundred (10,400) vibrations per minute (vpm). Concrete vibrators of lesser capacity are unacceptable for use in any part of the construction. Contractor shall have at least one standby concrete vibrator ready for use for every two (2) concrete vibrators in use during a concrete placement.

B. All concrete shall be thoroughly consolidated with internal vibrators as recommended in ACI 309 immediately after deposition. The concrete shall be thoroughly worked around the reinforcing steel, around embedded items and into corners of forms. Vibration shall be supplemented by spading, rodding, or forking to eliminate all honeycomb and voids around embedded items.

C. The vibrator shall be inserted vertically, allowing it to penetrate rapidly to the bottom of the lift and at least six (6) inches into the previous lift. The vibrator shall be held at the bottom of lift for five to fifteen (5 - 15) seconds. The vibrator shall be pulled up at a rate of about three (3) inches per second.

Page 185 of 412 ends

General Vang Pao Park Section 030000
February 2026 Concrete

030000-11
D. The vibrator shall be inserted so that the fields of action overlap. The field of action is approximately eight (8) times the vibrator’s head diameter. Thus for a two and one-half (2-1/2) inch diameter vibrator, the spacing of each insertion shall be approximately twenty (20) inches.

E. Vibration shall be stopped when the concrete surface takes a sheen and large air bubbles no longer escape.

F. Do not use a vibrator to move concrete horizontally.

3.4 OPENINGS AND INSERTS
A. Pipe sleeves, inserts for pipe connections, anchors, and forms for pipe holes shall be accurately placed and securely fastened to the forms in such a manner that the placing of concrete shall not alter their alignment or location. In the event that openings are inadvertently omitted or improperly placed, Owner’s Representative may require the concrete to be cored at the proper location. Filling of improperly placed openings shall be done with expansive grout or dry pack or mortar applied with an accepted epoxy adhesive. The surfaces of the opening shall be roughened prior to filling.

3.5 EMBEDDED ITEMS
A. At the time of concrete placement, embedded items shall be clean and free from mud, oil, and other coatings that may adversely affect bonding capacity. Aluminum embedments shall be coated with a bituminous material to prevent electrolytic action between the embedded item and reinforcing steel that results in concrete deterioration.

Embedment items shall be accurately placed and securely fastened to the forms in such a manner that the placing of concrete shall not alter their alignment or location. Contact between embedded items and reinforcing steel or tendon ducts is unacceptable and is not permitted.

3.6 CONSTRUCTION JOINTS
A. The location of all construction joints shall be subject to the acceptance of Owner’s Representative. The surface of all construction joints shall be thoroughly cleaned and all laitance and standing water removed. Clean aggregate shall be exposed by abrasive blast cleaning. Wire brushing and air water jets may be used while concrete is fresh provided results are equal to abrasive blast cleaning. Construction joints shall be keyed at right angle to the direction of shear. Except where otherwise shown on the Drawings, keyways shall be at least one and one-half (1-1/2) inch in depth over at least twenty five percent (25%) of the area of the section.

Page 186 of 412 ends

General Vang Pao Park Section 030000
February 2026 Concrete

030000-12

3.7 EVAPORATIVE RETARDANT
A. The use of an evaporative retardant is required to assist in proper placement of concrete.

Apply two (2) times; after screeding and after the first floating operation. The retardant should be applied at a rate of one (1) gallon of sprayable solution per two hundred to four hundred (200 - 400) square feet by spraying with an industrial type sprayer. If the nozzle of the sprayer becomes plugged, Contractor shall clean, or replace, the nozzle.

Under no circumstances shall the retardant be used except by spraying a mist with a nozzle. The retardant shall be applied in strict conformance with the manufacturer’s recommendations and precautions. In no case shall the retardant be used as a finishing agent. The use of an evaporative retardant requires review and approval by Owner’s Representative.

3.8 FIELD QUALITY CONTROL
A. Contractor shall assist Owner or the concrete testing consultant as requested during the performance of quality control testing. When concrete is placed using a concrete pumper, concrete for testing will be taken from the pumper discharge hose.

END OF SECTION 03 00 00

Page 187 of 412 ends

General Vang Pao Park Section 031000
February 2026 Concrete Forming and Accessories
031000 - 1
SECTION 031000

CONCRETE FORMING AND ACCESSORIES
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Formwork for cast-in-place concrete.

2. Shoring, bracing, and anchorage.

3. Wood form materials.

4. Prefabricated forms.

5. Formwork accessories.

6. Form stripping.

B. Related Requirements:

1. Section 033000 - Cast-in-Place Concrete: Cast-in-place or in-situ concrete for structural building frame, slabs-on-grade, and other concrete components associated with building.

1.2 MEASUREMENT AND PAYMENT
A. Refer to Measurement and Payment section.

1.3 REFERENCE STANDARDS
A. American Concrete Institute:

1. ACI 117 - Specification for Tolerances for Concrete Construction and Materials.

2. ACI 301 - Specifications for Structural Concrete.

3. ACI 318 - Building Code Requirements for Structural Concrete.

4. ACI 347 - Guide to Formwork for Concrete.

B. American Forest & Paper Association:

1. AF&PA - National Design Specification (NDS) for Wood Construction.

C. American Society of Mechanical Engineers:

1. ASME A17.1 - Safety Code for Elevators and Escalators.

D. APA - The Engineered Wood Association:

Page 188 of 412 ends

General Vang Pao Park Section 031000
February 2026 Concrete Forming and Accessories
031000 - 2

1. APA/EWA PS 1 - Voluntary Product Standard - Structural Plywood.

E. ASTM International:

1. ASTM D1751 - Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types).

2. ASTM E96 - Standard Test Methods for Water Vapor Transmission of Materials.

F. West Coast Lumber Inspection Bureau:

1. WCLIB - Standard No. 17 Grading Rules for West Coast Lumber.

1.4 COORDINATION
A. Coordinate Work of this Section with other Sections of Work in forming and placing openings, slots, reglets, recesses, sleeves, bolts, anchors, other inserts, and components of other Work.

1.5 QUALITY ASSURANCE
A. Perform Work according to ACI 347.

B. For wood products furnished for Work of this Section, comply with AF&PA.

1.6 DELIVERY, STORAGE, AND HANDLING
A. Store materials off ground in ventilated and protected manner to prevent deterioration from moisture.

PART 2 - PRODUCTS

2.1 WOOD FORM MATERIALS
A. Softwood Plywood: Comply with APA/EWA PS 1, exterior BB (Concrete form) Class 1 plywood.

B. Plywood Forms:

1. Application: Exposed finish concrete.

2. Description:
a. Comply with APA/EWA PS 1.
b. Panels: Full size, 4 by 8 feet.
c. Label each panel with grade trademark of APA/EWA.

Page 189 of 412 ends

General Vang Pao Park Section 031000
February 2026 Concrete Forming and Accessories
031000 - 3

3. Plywood with "Smooth Finish" Indicated on Drawings:
a. Minimum Thickness: 3/4 inch.
b. Grade: APA/EWA "HD Overlay Plyform Structural I Exterior."

2.2 PREFABRICATED FORMS
A. Tubular Column:

1. Description: Round spirally wound laminated fiber.

2. Surface Treatment: Release agent, non-reusable.

3. Sizes: As indicated on Drawings.

4. Manufacturers:
a. Sonotube.
b. Or equal.

2.3 FORMWORK ACCESSORIES
A. Form Release Agent:

1. Description: Colorless mineral oil that will not stain concrete or absorb moisture.

B. Corners:

1. Type: Fillet or chamfer.

2. Lengths: Maximum possible.

C. Preformed Joint Filler Bituminous Joint Filler: Comply with ASTM D1751.

D. Nails, Spikes, Lag Bolts, Through Bolts, Anchorages: Size, strength, and character to maintain formwork in place while placing concrete.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Verify lines, levels, and centers before proceeding with formwork.

B. Verify that dimensions agree with Drawings.

C. If formwork is placed after reinforcement resulting in insufficient concrete cover over reinforcement, request instructions from Engineer before proceeding.

Page 190 of 412 ends

General Vang Pao Park Section 031000
February 2026 Concrete Forming and Accessories
031000 - 4

3.2 INSTALLATION
A. Formwork:

1. Provide top form for sloped surfaces steeper than 1.5 horizontal to 1 vertical to hold shape of concrete during placement, unless it can be demonstrated that top forms can be omitted.

2. Construct forms to correct shape and dimensions, mortar-tight, braced, and of sufficient strength to maintain shape and position under imposed loads from construction operations.

3. Camber forms where necessary to produce level finished soffits unless indicated otherwise on Drawings.

4. Positioning:
a. Carefully verify horizontal and vertical positions of forms. b. Correct misaligned or misplaced forms before placing concrete.

5. Complete wedging and bracing before placing concrete.

6. Erect formwork, shoring, and bracing to achieve design requirements according to ACI 301.

7. Stripping:
a. Arrange and assemble formwork to permit dismantling and stripping. b. Do not damage concrete during stripping.
c. Permit removal of remaining principal shores.

8. Obtain approval of Engineer before framing openings in structural members not indicated on Drawings.

9. Do not patch formwork.

10. Leave forms in place for minimum number of days according to ACI 347.

B. Comply with manufacturer's installation instructions, performing each step in sequence.

Maintain one set of manufacturer's installation instructions at Project Site during installation and until completion of construction.

C. Form Removal:

1. Do not remove forms or bracing until concrete has gained sufficient strength to carry its own weight and imposed loads, and removal has been approved by Engineer.

2. Loosen forms carefully; do not wedge pry bars, hammers, or tools against finish concrete surfaces scheduled for exposure to view.

3. Store removed forms in manner that surfaces to be in contact with fresh concrete will not be damaged.

4. Discard damaged forms.

5. Form Release Agent:
a. Apply according to manufacturer instructions.

Page 191 of 412 ends

General Vang Pao Park Section 031000
February 2026 Concrete Forming and Accessories
031000 - 5
b. Apply prior to placement of reinforcing steel, anchoring devices, and embedded items.
c. Do not apply form release agent if concrete surfaces are indicated to receive special finishes or applied coverings that may be affected by agent. d. Soak inside surfaces of untreated forms with clean water, and keep surfaces coated prior to placement of concrete.

6. Form Cleaning:
a. Clean forms as erection proceeds to remove foreign matter within forms. b. Clean formed cavities of debris prior to placing concrete. c. Flush with water or use compressed air to remove remaining foreign matter. d. Ensure that water and debris drain to exterior through cleanout ports. e. Cold Weather:
1) During cold weather, remove ice and snow from within forms. 2) Do not use de-icing salts.
3) Do not use water to clean out forms, unless formwork and concrete construction proceed within heated enclosure; use compressed air or other dry method to remove foreign matter.

7. Reuse and Coating of Forms:
a. Thoroughly clean forms and reapply form coating before each reuse. b. For exposed Work, do not reuse forms with damaged faces or edges. c. Apply form coating to forms according to manufacturer instructions. d. Do not coat forms for concrete indicated to receive "scored finish." e. Apply form coatings before placing reinforcing steel.

D. Forms for Smooth Finish Concrete:

1. Use steel, plywood, or lined-board forms.

2. Use clean and smooth plywood and form liners, uniform in size, and free from surface and edge damage capable of affecting resulting concrete finish.

3. Install form lining with close-fitting square joints between separate sheets without springing into place.

4. Use full-sized sheets of form liners and plywood wherever possible.

5. Tape joints to prevent protrusions in concrete.

6. Apply forming and strip wood forms in a manner to protect corners and edges.

7. Level and continue horizontal joints.

8. Keep wood forms wet until stripped.

E. Inserts, Embedded Parts, and Openings:

1. Install formed openings for items to be embedded in or passing through concrete Work.

2. Locate and set in place items required to be cast directly into concrete.

Page 192 of 412 ends

General Vang Pao Park Section 031000
February 2026 Concrete Forming and Accessories
031000 - 6

3. Install accessories straight, level, and plumb, and ensure that items are not disturbed during concrete placement.

4. Openings:
a. Provide temporary ports or openings in formwork as required to facilitate cleaning and inspection.
b. Locate openings at bottom of forms to allow flushing water to drain.

5. Close temporary openings with tight-fitting panels, flush with inside face of forms, and neatly fitted such that joints will not be apparent in exposed concrete surfaces.

F. Form Ties:

1. Provide sufficient strength and quantity to prevent spreading of forms.

2. Place ties at least 1 inch away from finished surface of concrete.

3. Leave inner rods in concrete when forms are stripped.

4. Space form ties equidistant, symmetrical, and aligned vertically and horizontally unless indicated otherwise on Drawings.

G. Arrange formwork to allow proper erection sequence and to permit form removal without damage to concrete.

H. Construction Joints:

1. Install surfaced pouring strip where construction joints intersect on exposed surfaces to provide straight line at joints.

2. Just prior to subsequent concrete placement, remove strip and tighten forms to conceal shrinkage.

3. Appearance:
a. Show no overlapping of construction joints.
b. Construct joints to present same appearance as butted plywood joints.

4. Arrange joints in continuous line straight, true, and sharp.

I. Embedded Items:

1. Make provisions for pipes, sleeves, anchors, inserts, reglets, anchor slots, nailers, water stops, and other features.

2. Do not embed wood or uncoated aluminum in concrete.

3. Obtain installation and setting information for embedded items furnished under other Sections.

4. Securely anchor embedded items in correct location and alignment prior to placing concrete.

5. Ensure that conduits and pipes, including those made of coated aluminum, meet requirements of ACI 318 regarding size and location limitations.

J. Openings for Items Passing through Concrete:

1. Frame openings in concrete where indicated on Drawings.

Page 193 of 412 ends

General Vang Pao Park Section 031000
February 2026 Concrete Forming and Accessories
031000 - 7

2. Establish exact locations, sizes, and other conditions required for openings and attachment of Work specified under other Sections.

3. Coordinate Work to avoid cutting and patching of concrete after placement.

4. Perform cutting and repairing of concrete required as result of failure to provide required openings.

K. Screeds:

1. Set screeds and establish levels for tops of and finish on concrete slabs.

2. Slope slabs to drain where required or as indicated on Drawings.

3. Before depositing concrete, remove debris from space to be occupied by concrete and thoroughly wet forms; remove freestanding water.

L. Screed Supports:

1. For concrete over waterproof membranes and vapor retarder membranes, use cradle-, pad-, or base-type screed supports that will not puncture membrane.

2. Staking through membrane is not permitted.

3.3 TOLERANCES
A. Comply with manufacturers' recommended tolerances and tolerance requirements in reference standards. When such tolerances conflict with Contract Documents, request clarification from Engineer before proceeding.

B. Construct formwork to maintain tolerances according to ACI 301.

3.4 FIELD QUALITY CONTROL
A. Inspection:

1. Inspect erected formwork, shoring, and bracing to ensure that Work complies with formwork design and that supports, fastenings, wedges, ties, and items are secure.

2. Notify Engineer after placement of reinforcing steel in forms but prior to placing concrete.

3. Schedule concrete placement to permit formwork inspection before placing concrete.

END OF SECTION

Page 194 of 412 ends

General Vang Pao Park Section 10430
February 2026 Sign and Sign Posts
SECTION 10430

SIGNS AND SIGN POSTS
A. SCOPE
This section consists of furnishing and installing sign panels, sign posts, fastening hardware, back braces, straps and saddle brackets at the locations shown on the plans or as designated by the Owners Representative. All work shall conform to Section 56 of the State Standard Specifications unless otherwise stated within these specifications.

B. MATERIALS
SINGLE SHEET ALUMINUM SIGN shall be fabricated from sheet aluminum alloy 6061-T6 or 5052-H38 and shall not have a vertical splice in the sheet aluminum. Aluminum sheeting must be free of buckles, warps, dents, cockles, burrs and defects resulting from fabrication and installation. All single sheet aluminum signs shall conform to Section 82-2 “Signs and Panels” of the latest State Standard Specifications.

RETROREFLECTIVE SHEETING shall be Type IV microprismatic, or approved equal.

Retroreflectivity of the sheeting for sign background and legend shall conform to the requirements in ASTM Designation D 4956. Retroreflective sheeting must have Class 1, 3, or 4 adhesive backing and shall be applied to sign panels as recommended by the retroreflective sheeting manufacturer without stretching, tearing, and damage. The orientation of the legend must comply with the retroreflective sheeting manufacturer’s instructions. The retroreflective sheeting must be a single, contiguous sheet without splices except for the splices produced during the manufacturing process of the retroreflective sheeting. The adhesive backing shall be pressure sensitive and fungus resistant.

METAL SIGN POSTS shall be 2” diameter galvanized post. Galvanizing shall conform to the provisions in Section 75-1.02B of the State Standard Specifications. Sign posts shall be free of buckles, warps, dents, cockles, burrs and defects resulting from fabrication and installation.

SIGN PANEL FASTENING HARDWARE: Framing assemblies for multiple sign installations shall be fabricated of structural steel conforming to the requirements in ASTM A36/A36M, or of aluminum alloy as shown on the Plans. Frames fabricated of structural steel shall be hot-dip galvanized after fabrication.

Back braces for signs shall be commercial quality, mild steel, hot-dip galvanized after fabrication.

Straps and saddle brackets for mounting sign panels on electroliers, sign structure posts and traffic signal standards or where shown on the Plans shall be stainless steel conforming to the requirements in ASTM A 167, Type 302 or 304. Theft-proof bolts shall be stainless steel with a chromium content of at least 16 percent and a nickel content of at least 8 percent.

Lag screws, bolts (except theft-proof bolts), metal washers and nuts shall be commercial quality steel, hot-dip galvanized after fabrication. Fiber washers shall be of commercial quality.

Page 195 of 412 ends

General Vang Pao Park Section 10430
February 2026 Sign and Sign Posts
Galvanizing shall conform to the provisions in Section 75-1.05 of the State Standard Specifications.

Components of bolted assemblies shall be galvanized separately before assembly.

C. WORKMANSHIP
POSTS: Excavate post holes to the depth shown. Place posts in the holes. Backfill material for posts must be Class B concrete as provided in Section TS 9, “Concrete Work”, of these Technical Specifications. Surplus excavated material shall be disposed of in a uniform manner within the project limits as directed by the Engineer. The line between the center of the top of a post and the center of a post at the ground line shall be plumb within a tolerance of not to exceed 0.02 foot in 10 feet.

SIGN PANELS: Sign information must be imprinted in 1/4-inch upper case letters and numerals. Locate this information on the back, lower right of each sign panel so that it will not be blocked by a sign post or mounting frame. Sign information must include:

1. Sign fabricator's name

2. Month and year of fabrication

3. Type of retroreflective sheeting

4. Sheeting manufacturer's identification and lot number for the retroreflective sheeting Sign information must be imprinted at the fabrication plant by die-stamping on aluminum panels or by an equivalent method for aluminum signs, such as affixing a die-stamped aluminum tag.

The information must not be painted, screened, inked, or engraved. The information must be imprinted in a way that does not damage the face of the sign.

Sign panels shall be installed by the Contractor in conformance with the details on the Plans or as directed by the Owners Representative. Any chipping or bending of sign panels shall be considered as sufficient cause to require replacement of panels at the Contractor’s expense.

All fastening hardware shall be furnished by the Contractor.

Signs shall be free from blemishes that may affect the serviceability and detract from the general sign color and appearance when viewing during daytime and nighttime from a distance of 25 feet.

The face of each finished sign shall be uniform, flat, smooth, and free of defects, scratches, wrinkles, gel, hard spots, streaks, extrusion marks, and air bubbles. The front, back, and edges of the sign panels shall be free of router chatter marks, burns, sharp edges, loose rivets, delaminated skins, excessive adhesive over-spray and aluminum marks.

D. CERTIFICATES OF COMPLIANCE
The California Department of Transportation maintains a list of Prequalified and Tested Signing and Delineation Materials. The Engineer shall not be precluded from sampling and testing products on the list of Prequalified and Tested Signing and Delineation Materials.

The Contractor shall work with the manufacturer of products on the list of Prequalified and Tested Signing and Delineation Materials and furnish the Engineer a Certificate of Compliance in conformance with the provisions in Section 6- 1.07, "Certificates of Compliance," of the State

Page 196 of 412 ends

General Vang Pao Park Section 10430
February 2026 Sign and Sign Posts
Standard Specifications for each type of traffic product supplied.

For those categories of materials included on the list of Prequalified and Tested Signing and Delineation Materials, only those products shown within the listing may be used in the work.

Other categories of products, not included on the list of Prequalified and Tested Signing and Delineation Materials, may be used in the work provided they conform to the requirements of the State Standard Specifications.

E. MEASUREMENT
Measurement of Signs and Sign Posts will be made as a field count of each sign post with sign installed as a single unit per the drawings and these technical specifications.

END OF SECTION

Page 197 of 412 ends

General Vang Pao Park Section 11 68 00
February 2026 Playground Equipment
11 68 00-1
SECTION 11 68 00

PLAYGROUND EQUIPMENT
PART 1 - GENERAL

1.0 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including Division 01 Specification Sections, apply to this Section.

1.1 SUMMARY
A. This Section includes the following:

B. Playground Equipment coordination and installation.

1. Playground Equipment will be Owner-provided and installed by Recreation Science except where noted.

2. Contractor is responsible for coordinating the work with all related trades and materials suppliers, including site elements, safety surfacing, and utilities.

3. Contractor will select and pay for Playground Safety Inspector prior to layout of play area and installation. Contractor is responsible for scheduling the reviews and inspections. Related Sections include the following:
a. Section 321816.13 Playground Resilient Surfacing EPDM for protective surfacing under and around playground equipment.

1.2 DEFINITIONS
A. Fall Height: According to ASTM F 1487, "the vertical distance between a designated play surface and the protective surfacing beneath it."
B. HDPE: High-density polyethylene.

C. IPEMA: International Play Equipment Manufacturers Association.

D. LLDPE: Linear low-density polyethylene.

E. MDPE: Medium-density polyethylene.

F. Use Zone: According to ASTM F 1487, "the area beneath and immediately adjacent to a play structure that is designated for unrestricted circulation around the equipment and on whose surface it is predicted that a user would land when falling from or exiting the equipment."

1.3 PERFORMANCE REQUIREMENTS
A. Safety

Page 198 of 412 ends

General Vang Pao Park Section 11 68 00
February 2026 Playground Equipment
11 68 00-2

1. Installation of playground equipment, including any specialty concrete, shall meet the safety requirements of the current CPSC and ASTM F 1487 and Title 22. Social Security; Division 4. Environmental Health; Chapter 22. Safety Regulations for Playgrounds.

1.4 SUBMITTALS
A. Provide submittals in accordance with Administrative Requirements and Section 321816.13 – Playground Resilient Surfacing EPDM. Contractor shall provide submittals in a timely manner to facilitate the ordering of equipment and to allow installation in accordance with the approved construction schedule.

B. Installer Qualifications

1. Installer Certificates: Signed by manufacturers certifying that installers comply with requirements.

2. Provide evidence the installer of the play equipment possesses liability insurance of at least $1,000,000 from a reputable insurance company covering defects in materials, workmanship, and installation. This liability shall cover any bodily harm resulting from a failure of play equipment due to installation defects.

3. Qualification Data:
a. For Installer: Submit a listing of at least five installations where the brand of play equipment with similar units to those proposed has been installed and has been in successful service for at least five years. This list shall include owner or purchaser; address of installation; service or maintenance organization; date of installation; and contact person and phone number.
b. For Manufacturer: Submit documentation that the Playground Equipment Manufacturer is ISO 9001 certified (Quality Management Standard) and ISO 14001 certified (Environmental Management Standard) C. Product Data: For each type of product indicated submit two electronic copies of play equipment product data, catalog cuts, photo brochures, specifications, and installation procedures, (including diagrams, instructions, scale models) or other printed information in sufficient detail and scope to verify compliance with requirements of the contract documents
D. Provide a Certificate of Insurance from the manufacturer, covering both product and general liability, of not less than $1,000,000. The issuing underwriter shall be AA rated.

E. Product Certificates: For each type of playground equipment, signed by product manufacturer.

F. Material Samples for Final Color Selection: For each type of material incorporated within the selected play equipment configuration.

G. Manufacturer Compliance Letter: Play Equipment Manufacturer shall provide Contractor and Owner a letter stating that the equipment design and detailing meets all professional standards of care for playground equipment, including compliance with ASTM, USCPSC Guidelines for Public Playground Safety,
H. Material Certificates: For the following items, signed by manufacturers:

Page 199 of 412 ends

General Vang Pao Park Section 11 68 00
February 2026 Playground Equipment
11 68 00-3

1. Shop finishes.

2. Recycled plastic.

I. Submit a statement by the material supplier or equipment manufacturer asserting that the supplied material or equipment meets and is installed according to the specified requirements.

J. Maintenance Data: For playground equipment and finishes to include in maintenance manuals.

1. Submit two electronic copies of procedures and instructions pertaining to frequency of preventive maintenance, inspection, adjustment, lubrication, and cleaning necessary to minimize corrective maintenance and repair for play equipment. A list of all parts and components for the system, by manufacturer's name, part number, and nomenclature, shall be attached.

2. Supply a maintenance kit with each custom play structure that shall include wrenches for tamper-proof hardware, one (1) can of graffiti remover, primer, and spray paint to match the color of the structure, sandpaper, and a comprehensive maintenance manual. The maintenance manual shall include a complete plan drawing of the structure, inspection procedures, inspection report forms, and installation instructions and parts list. The entire kit is to be sent directly to the Owner..

K. Field quality-control test reports.

L. Product Test Reports: Based on evaluation of comprehensive tests performed by manufacturer and witnessed by a qualified testing agency, for playground equipment.

M. Warranty: Special warranty specified in this Spec section, See 1.7.

1. Provide manufacturer’s standard warranty against all defects in materials and workmanship for the installed play equipment.

N. Testing Agency Qualifications: Contractor shall provide an independent agent qualified according to ANSI Z34.1 for testing indicated.

1. Submit IPEMA certification showing compliance with all applicable portions of the current ASTM F-1487 Standard.

1.5 DELIVERY, STORAGE, AND HANDLING
A. Contractor responsible for coordinating delivery and storage with Recreation Science B. Equipment shall be delivered and stored in accordance with the manufacturer's recommendations.

C. Protect materials from adverse weather.

1.6 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace playground equipment components that fail in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:
a. Structural failures including chipping, breaking or bending.

Page 200 of 412 ends

General Vang Pao Park Section 11 68 00
February 2026 Playground Equipment
11 68 00-4
b. Deterioration of metals, metal finishes, and other materials beyond normal weathering.

2. Play Equipment Warranty Period:
a. 3 YEAR LIMITED WARRANTY for all moving parts; swing seats and hangers; track ride trolleys and bumpers; spring assemblies for all rocking equipment and any other equipment not included above against failure due to corrosion, deterioration or workmanship.
b. 10 YEAR LIMITED WARRANTY for all aluminum; posts, clamps, beam, and caps, against structural failure due to corrosion, deterioration or workmanship. This warranty does not include any cosmetic issues. c. 15 YEAR LIMITED WARRANTY for all plastic and steel components, against structural failure due to corrosion, deterioration or workmanship.

This warranty does not include any cosmetic issues.
d. 15 YEAR LIMITED WARRANTY for protective plastic coating against structural failure due to corrosion, deterioration or workmanship. This warranty does not include any cosmetic issues.

3. General Warranty:
a. Manufactured playground equipment shall be guaranteed against defects in workmanship, materials, or installation for a minimum period of one year after Substantial Completion. Warranty shall include but not be limited to such defects as bubbling, delamination, peeling, loss of integrity, poor ultraviolet stability, lack of permeability, or general deterioration due to weather. All posts shall be guaranteed against deterioration for ten years.

All rotationally molded components shall be guaranteed for five years.

1.7 SUBSTITUTIONS
A. Contractor shall coordinate and install the play equipment shown on the drawings and described in this section. Substitutions are not allowed.

PART 2 - PRODUCTS

2.1 PLAYGROUND EQUIPMENT AND STRUCTURES (Contractor Furnished, Contractor Installed)
A. Refer to plans

2.2 MATERIALS
A. Aluminum: Alloy and temper recommended by manufacturer for type of use and finish indicated.

1. Cast aluminum: ASTM B 179
B. Steel: Comply with the following:

1. Steel Plates, Shapes, and Bars: ASTM A 36, hot-dip galvanized.

2. Steel Pipe: ASTM A 53 or ASTM A 135, standard-weight, hot-dip galvanized.

3. Steel Tubing: ASTM A 500 or ASTM A 513, cold formed, hot-dip galvanized.

C. Stainless-Steel Sheet: ASTM A 240 or ASTM A 666; Type 304.

D. Fittings: ASTM A 467, Class CS, 4/0 or 5/0, commercial-quality, hot-dip galvanized steel connectors and swing or ring hangars.

Page 201 of 412 ends

General Vang Pao Park Section 11 68 00
February 2026 Playground Equipment
11 68 00-5
E. Castings and Hangers: Malleable iron, ASTM A 47, Grade 32510, hot-dip galvanized.

F. Hardware: Manufacturer's standard; commercial-quality; corrosion-resistant; hot-dip galvanized steel and iron, stainless steel, or aluminum; of a secure and vandal-resistant design.

G. Fasteners: Manufacturer's standard; corrosion-resistant; hot-dip galvanized or plated steel and iron, or stainless steel; permanently capped, and theft resistant.

H. Opaque Plastic: Color impregnated, UV stabilized, and mold resistant.

1. Polyethylene: Fabricated from 96 percent recycled, purified, fractional-melt plastic resin; rotationally molded HDPE, LLDPE, or MDPE with not less than 1/4-inch wall thickness.

I. Rotationally Molded Poly Parts: These parts shall be molded using prime compounded linear low-density polyethylene with a tensile strength of 2500 psi per ASTM D 638 and with color and UV stabilizing additives. Wall thickness varies by product from .187 inches (3/16 inch) to .312 inches (5/16 inch). Color shall be specified (four standard colors are available).

J. Permalene Parts: These parts shall be manufactured from .75 inches thick high-density polyethylene that has been specially formulated for optimum UV stability and color retention. Compression-molded products shall meet or exceed density of. 933 G/cc per ASTM D 1505, tensile strength of 2400 psi per ASTM D 638. Color shall be specified (standard solid colors are tan, red, blue, green, and yellow). Some permalene parts are available in two-color laminate product with (2) .070 inches thick exterior layers over a .610 inches interior core of contrasting color. Color shall be specified (eight standard two-color options are available).

K. Custom Components: These parts shall be manufactured in sizes and shapes as shown on the drawings and as required to complete the play equipment layout. Custom components shall meet or exceed ASTM standards as set forth in the General Requirements section. All custom components must be approved by the Owner’s Representative.

L. Stepped Play Surfaces: Provide stepped platforms where indicated on Drawings.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine areas and conditions, with Installer present, for compliance with requirements for site clearing, earthwork, site surface and sub-grade drainage, and other conditions affecting performance.

1. Do not begin installation before final grading required for placing protective surfacing is completed, unless otherwise permitted by the Owner’s representative.

2. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION
A. Prior to start of excavation, Contractor shall lay out the entire outdoor play area and stake location of all elements, including playground equipment, use zones, pathways, planters,

Page 202 of 412 ends

General Vang Pao Park Section 11 68 00
February 2026 Playground Equipment
11 68 00-6
and hard surfaces, based on actual playground equipment supplied to be installed. Use zones shall not overlap hard surfaces, and shall meet criteria of current releases of CPSC, ASTM F 1292 and ASTM F 1487. The Owner’s representative reserves the right to adjust the equipment locations and other elements to meet field conditions and use zone safety requirements.

3.3 INSTALLATION, GENERAL
A. General: Comply with manufacturer's written installation instructions, unless more stringent requirements are indicated. Anchor playground equipment securely, positioned at locations and elevations indicated.

1. Maximum Equipment Height: Coordinate installed heights of equipment and components with finished elevations of protective surfacing. Set equipment so fall heights and elevation requirements for age group use and accessibility are within required limits. To meet the impact attenuation requirements of the playground safety surface in accordance with ASTM F1292 and Section 321816.13 PLAYGROUND RESLIENT SURFACES, the maximum accessible height of playground equipment shall be as specified by the manufacturer. Verify that playground equipment elevations comply with requirements for each type and component of equipment.

2. All components of the equipment shall be installed accurately to produce true plumb and level installation.

B. Post and Footing Installation

1. Excavation: Excavate holes for posts and footings as indicated in firm, undisturbed or compacted sub-grade soil.

2. Post Set on Sub-grade: Level bearing surfaces with drainage fill to required elevation.

3. Post Set with Concrete Footing: Comply with ACI 301 for measuring, batching, mixing, transporting, forming, and placing concrete.
a. Set equipment posts in/on concrete footing. Protect portion of posts above footing from concrete splatter. Verify that posts are set plumb or at the correct angle, alignment, height, and spacing.
1) Place concrete around posts and vibrate or tamp for consolidation. Hold posts in position during placement and finishing operations until concrete is sufficiently cured.
b. Embedded Items: Use setting drawings and manufacturer's written instructions to ensure correct installation of anchorages for equipment. c. Concrete Footings: Smooth top, and shape to shed water.

3.4 PLAY AREA LAYOUT REVISIONS
A. The play area equipment layout, as shown on the Drawings, is based on the use of specific equipment designed for specific aesthetic character, play value and activities. The use of other equipment suppliers with different configurations, if approved, will require the Contractor to provide a revised play equipment layout and obtain approval of both the equipment and the play area layout from the Owner’s Representative. Contractor shall be responsible for all costs to revise the layout including review of the layout and documentation of the revised layout by Owner’s consultant. The revised play equipment layout shall include appropriate safety use zone clearances for the equipment selected.

Page 203 of 412 ends

General Vang Pao Park Section 11 68 00
February 2026 Playground Equipment
11 68 00-7

3.5 LEVEL OF SAFETY SURFACING
A. All play equipment located in areas of sand, wood fiber, or other surfacing shall be clearly marked to indicate the finished level of safety surfacing material to meet impact- attenuating requirements. All metal posts, springs or supports shall be as marked by the manufacturer.

Those items not marked by the manufacturer shall be marked with a 3/4" circle painted with black epoxy paint.

3.6 QUALITY CONTROL, INSPECTION AND ACCEPTANCE
A. Arrange for playground equipment manufacturer's technical personnel to inspect playground and playground equipment and components during installation and at final completion and to certify compliance with the following:

1. ASTM F 1487.

2. CPSC No. 325.

B. Notify the Owner’s representative at least 48 hours in advance of date and time of final inspection.

C. Replace all defective or damaged play equipment prior to acceptance.

D. Prior to final inspection and acceptance, remove all rubbish and excess material for disposal as approved, and leave area in a neat, satisfactory condition.

E. CERTIFICATION INSPECTION

1. All play equipment shall be inspected by a Playground Safety Inspector with a valid certification from the National Playground Safety Institute (NPSI) for compliance in accordance with ASTM F 1487-98 and the USCPSC Handbook for Public Playground Safety. Contractor to provide a signed documentation of compliance certification.

END OF SECTION

Page 204 of 412 ends

General Vang Pao Park Section 16050
February 2026 Electrical General Requirements
16050-1
SECTION 16050

ELECTRICAL GENERAL REQUIREMENTS
PART 1 GENERAL

1.1 WORK INCLUDED
A. Furnish and install all necessary labor, materials, tools and equipment to perform and completely finish the work according to the intent of this specification, and the accompanying drawings.

B. Furnish and install any incidental work which can reasonably be inferred as required and necessary to provide complete and workable systems.

C. Provide connections of all equipment including installation and connection of all motors, relays, remote starters, etc.

1.2 LOCAL CONDITIONS
A. Examine site; verify dimensions and locations against drawings and become informed of all conditions under which work is to be done before submitting proposal. No allowance will be made for extra expenses because of omission on Contractor’s apart to include cost of work under prevailing conditions.

B. Information shown relative to services is based upon available records and data shall be regarded as approximate only. Minor deviations found necessary to conform with actual locations and conditions shall be made without extra cost.

1.3 PERMITS AND INSPECTIONS
A. Obtain and pay for all permits and service charges required in installation of the work. Arrange for required inspections and secure approvals from authorities having jurisdiction.

B. During its progress, work shall be subject to inspection by Project Inspector.

1.4 CODES AND STANDARDS
A. Work and materials shall be in full accordance with California Occupational Safety Health Act (CAL-OSHA), California Electrical Code (CEC), State Fire Marshal, Electrical Safety Orders (Title 8, Subchapter 5), the National Fire Protection Association, California Building Code (CBC); California Code of Regulations – Title 24 and other applicable State or local laws or regulations. Nothing in the Drawings or Specifications shall be construed to permit work not conforming to these codes.

B. Electrical materials shall bear the label of, or be listed by, the Underwriter’s Laboratories (UL) unless of a type for which label or listing service is not provided.

C. Materials and components shall conform to Industry Standards, including:

Page 205 of 412 ends

General Vang Pao Park Section 16050
February 2026 Electrical General Requirements
16050-2

1. NEMA – National Electrical Manufacturer’s Association

2. ANSI – American National Standard Institute

3. ASTM – American Society for Testing Material Association

4. IPCEA – Insulated Power Cable Owners Representative’s Association

5. CBM – Certified Ballast Manufacturers
D. When Contract Documents differ from governing codes, furnish and install larger size or higher standards called for without extra charge.

1.5 REVIEW OF MATERIALS
A. Prior to commencement of work and within 35 days after award of contract, submit for approval in accordance with General Conditions all equipment and materials to be furnished including all substitutions.

1. Equipment / Product submittals shall be bound and indexed by their referenced specification section and shall include a table of contents listing all equipment submitted including description of product and part numbers. Where a group or series of products are submitted, each item does not have to be listed only the series need to be identified.

2. Shop drawings submittals shall be neat and professionally done using CAD (computer aided drafting), hand-drawn submittals will not be accepted. Shop drawings shall have sufficient information to clearly indicate work to be performed and be complete including device / equipment locations, wire sizes, wire types and number of wires, symbol list or legend, point-to-point connections, wiring diagrams, and equipment anchorage detail where needed.

B. Substitutions

1. Substitution will be considered 10 days prior to the award of the contract on each item of material or equipment. No substitutions will be considered thereafter.

Substitutions will be interpreted to be all manufacturers other than those specifically listed by model or catalog number. Should the original submittal of a proposed substitution be rejected, the specified item shall be furnished.

2. Submit complete information or catalog data to show equality of equipment or material offered to that specified. No substitutions will be allowed unless requested and approved in writing. Materials of equal merit and appearance, in the opinion of the Owners Representative, will be approved for use. Owners Representative reserves the right to require originally specified item.

3. Acceptance of a substitute is not to be considered a release from the Specifications. Any deficiencies in an item, even though approved, shall be corrected by the Contractor at his expense.

Page 206 of 412 ends

General Vang Pao Park Section 16050
February 2026 Electrical General Requirements
16050-3

4. Responsibility for installation of approved substitution is include herein. Any changes required for installation of approved substituted equipment shall be made without additional cost to Owner.

5. Where it is in the best interest of the Owner, Owners Representative may give written consent to a submittal received after expiration of designated time limits, or for an additional resubmittal.

6. Submit for approval in ample time to avoid delay of construction, shop drawings or submittals on all items of equipment and materials covered in list mentioned above. Submit in accordance with General Conditions in a complete package; partial submittals will not be considered.

7. Failure to comply with any of the preceding requirements will necessitate that the specified materials be submitted and supplied.

1.6 RECORD DRAWINGS
A. Upon completion of Work, furnish Owners Representative with complete sets of plans on reproducible vellums (not marked blueprints) upon which shall be shown all Work installed under Contract, which are note in accordance with Original Contract Drawings.

B. All symbols and designations used in preparing Record Drawings shall match those used in Contract Drawings.

C. Show all buried and concealed conduit, stubs-outs, etc. Locate all buried conduit and stub-outs by dimensions from permanent, easily located and identifiable portions of structure; also dimension ends of stub-outs, etc. Note depth of buried items below grade.

1.7 ADDENDA AND CHANGE ORDERS
A. Changes in the plans and specifications shall be made by Addenda or Change Orders signed by the Owners Representative.

PART 2 PRODUCTS

2.1 MATERIALS
A. Materials mentioned herein or on drawings require that each item listed be provided and of quality noted, or an approved equal. All material shall be new, full weight and standard in all respects and in first-class conditions. Where possible, all materials used shall be of the same brand or manufacturer throughout for each class of material or equipment.

B. Grade or quality of materials desired is indicated by trade names or catalog numbers stated herein. Dimensions, sizes and capacities shown are a minimum and shall not be changed without permission of Owners Representative.

PART 3 EXECUTION

Page 207 of 412 ends

General Vang Pao Park Section 16050
February 2026 Electrical General Requirements
16050-4

3.1 DRAWINGS AND COORDINATION
A. Examine Drawings and Site; be familiar with types of construction where electrical installation is involved.

B. Work shall be neatly installed in a workmanlike manor in accordance with NECA Standard of Installation. Work shall be coordinated with other trades to avoid conflicts. Clarifications will be made by Owners Representative and minor adjustments shall be made without additional cost to Owner. Obtain ruling from Owners Representative concerning any obvious discrepancies or omissions in work before bidding. All work involved in correcting obvious errors or omissions after award of Contract shall be performed as directed by Owners Representative without additional cost to Owner
C. Layouts of equipment, accessories and wiring systems are diagrammatic (not pictorial), but shall be followed as closely as possible. Drawings and Specifications are for assistance and guidance, and exact locations, distances, levels, etc., will be governed by Site.

D. All equipment (devices, conduits, boxes, etc.) shall be flush or semi-flush mounted unless otherwise noted. Where conditions do not allow flush mounting and where acceptable to the Architect, equipment may be surface mounted.

3.2 WORKING SPACE
A. Provide adequate working space around electrical equipment in compliance with Article 4 of Electrical Safety Orders. In general, provide 36 inches minimum clear work space in front of panelboards and controls of 120/208 volt systems and 42 inches minimum for 277/480 volt systems.

3.3 CABLE AND CLEANING
A. All broken, damaged or otherwise defective parts shall be repaired or replaced without additional cost to Owner. Work shall be left in a condition satisfactory to Owners Representative. At completion, carefully clean and adjust all equipment, fixtures and trim installed as part of this work. Systems and equipment shall be left in a satisfactory operating condition.

B. All surplus materials and debris resulting from this work shall be cleaned out and removed from site; this includes surplus excavated material.

Page 208 of 412 ends

General Vang Pao Park Section 16050
February 2026 Electrical General Requirements
16050-5

3.4 EXCAVATING AND BACKFILLING
A. Excavate and backfill as required for installation of electrical work. Restore all surfaces, roadways, sod, walks, curbs, walls, existing underground installation, etc., cut by installations to original condition in an acceptable manner. Maintain all warning signs, barricades, flares and lanterns as required by the Safety Orders and local ordinances.

B. Excavation: Dig trenches straight and true to line and grade, with bottom clear of any rock points. Support conduit for entire length on undisturbed original earth. Minimum conduit depth of pipe crown shall be 2 feet below finished grade.

C. Backfill: All backfill material shall be local material free of rubble, rubbish or vegetation. Provide sand as backfill material where specified. Trenches shall be backfilled and compacted to 90% (per ASTM D1557) of maximum dry density at optimum moisture content in layers not to exceed 6 when compacted.

3.5 PROTECTION
A. In performance of work, protect work from damage. Protect electrical equipment, stored and installed from dust, water or other damage.

3.6 EQUIPMENT IDENTIFICATION
A. Panelboards, remote control switches, terminal boxes, etc., shall be properly identified with a descriptive nameplate. Nameplate shall be made of 3/32 inch laminated plastic with black background and white letters. Size of letters shall be º inch high for equipment in device box or boxes 12 or smaller, and ½ inch high for panelboard, terminal can, or larger items. Letters shall be machine engraved. Punched strip type nameplates and cardholders in any form are not acceptable. Namplates shall be attached with oval head machine screw tapped into front panel.

B. Indicate type of equipment and equipment designation, ex. “MAIN SWITCHBOARD-MSB”, “LIGHTING CONTROL PEDESTAL - SP”, Etc.

3.7 RUST INHIBITOR
A. Channels, joiners, hangers, straps, clamps, brackets, caps, nuts and bolts and associated parts shall be plated electrolytically with zinc followed immediately thereafter by treating freshly deposited zinc surfaces with chromic acid to obtain a surface which will not form a white deposit on surface for an average of one hundred twenty (120) hours when subjected to a standard salt spray cabinet test, or shall be hot dipped galvanized.

3.8 EQUIPMENT PADS
A. Concrete reinforced pads for mounting of equipment (i.e. switchboard, transformers, freestanding panels, etc.) shall be minimum 3000 psi, 6 thick with #4 rebars at 12 on center each way. Rebars shall be centered in pad. Pad shall extend 2 beyond equipment and 1-1/2 above surrounding area. Backfill and compact to 95%

Page 209 of 412 ends

General Vang Pao Park Section 16050
February 2026 Electrical General Requirements
16050-6
maximum dry density at optimum moisture content in layers not be exceed 6 when compacted.

3.9 EQUIPMENT ANCHORAGE
A. All equipment shall be braced or anchored to resist a horizontal force acting in any direction using the following criteria:

B. Fixed Equipment on Grade: 75% of operating weight.

C. Fixed Equipment on Structure: 50% of operating weight.

D. Simultaneous Vertical Force – Use 1/3 x Horizontal Force.

E. Where anchorage details are not shown on the drawings the field installation shall be subject to the approval of the Structural Owners Representative.

3.10 TEST
A. Test all wiring and connections for continuity and grounds; where such test indicate faulty insulation or other defects, located, repair and retest. Balance load at panelboards. Furnish all testing equipment.

3.11 CLOSING OF AN UNINSPECTED WORK
A. Do not allow or cause any work installed hereunder to be covered up or enclosed before it has been inspected and approved.

B. Should any work be enclosed or covered up before is has been approved, uncover such work and after is has been inspected and approved, make all repairs necessary to restore work of others to conditions in which it as found at time of cutting, all without additional cost.

3.12 WARRANTY
A. All materials and installation shall be provided with one (1) year warranty, which shall include replacement parts, labor, retesting, and travel to and from the job site.

The warranty period shall begin after final acceptance of the project. The warranty shall cover but is not limited to the following:

B. Defective workmanship and installation
C. All system components, devices, conduit, wires, etc.

D. Manufactured items such as light fixtures, receptacles, switchboard, panelboard, transformer, switches, etc.

E. Basic materials such as conduit, wires, boxes, cabinets, etc.

F. Certain manufactured items will have longer warranty periods. Refer to specific item and specification section for warranty information and terms.

Page 210 of 412 ends

General Vang Pao Park Section 16050
February 2026 Electrical General Requirements
16050-7

END OF SECTION

Page 211 of 412 ends

General Vang Pao Park Section 16100
February 2026 Basic Materials and Methods
16100-1
SECTION 16100

BASIC MATERIALS AND METHODS
PART 1 GENERAL

1.1 SCOPE
A. The work of this Section consists of basic materials and methods for all work included in this project. Additional specification requirements for electrical work are specified under other sections of this project.

1.2 SUBMITTALS
A. Submit product data per Section 16050 – Electrical General Requirements.

PART 2 PRODUCTS

2.1 CONDUIT
A. Rigid Steel Conduit: Standard weight, mild steel pipe, zinc coated on both inside and outside by a hot dipping or sherardizing process. Inside and outside of conduit shall be finished with a protective coating. All threads galvanized after cutting. Meets UL 6, UL Card #DYIX, and ANSI C80.1.

B. Intermediate Metallic Conduit (IMC): Intermediate weight, mild steel pipe, meeting same requirements for finish and material as rigid steel conduit. Meets UL 1242, UL Card #DYIX, and ANSI C80.6.

C. Electrical Metallic Tubing (EMT): Cold rolled steel tubing, hot-dipped galvanized, with zinc coating on outside and protective lubricating coating on inside. Fittings shall meet same requirements for finish and material as EMT. Meets UL 797 and ANSI C80.3.

D. Liquid Tight (LT) Flexible Conduit: Flexible steel, zinc coated on both inside and outside by hot dipping or sherardizing process with extruded ployvinyl covering and with watertight connectors. Conduit to be one continuous length, no couplings, minimum LT 1”.

E. PVC Conduit

1. Type 40, 90C, UL listed, composed of polyvinyl chloride, conforming to NEMA TC-2, Fed Spec WC1094A, UL651 Standards. Material shall have minimum tensile strength of 6,500 psi at 73.4F, flexural strength of 12,500 psi and compressive strength of 9,000 psi per ASTM testing. PVC conduit shall be suitable for direct burial without concrete encasement. Fitting shall be of same manufacture. All joints shall be solvent welded.

2. Type 80, similar to type 40 except with extra heavy wall.

Page 212 of 412 ends

General Vang Pao Park Section 16100
February 2026 Basic Materials and Methods
16100-2
F. Raceway Fittings:

1. Rigid Steel Conduit: Fittings, such as couplings, connectors, conduits, elbows, bends, etc., shall be subject to same requirements as for rigid steel conduit.

Couplings and unions shall be threaded type, assembled with anti-corrosion, conductive anti-seize compound at joints made absolutely tight to exclude water. Connectors shall be threaded hubs with bonding insulated metallic bushings. Unions shall be equal to Crouse Hinds UNY or UNF.

2. IMC: Fittings shall be as specified for rigid steel conduit.

3. EMT: Fittings shall be steel, box connectors shall have insulated throat.

Connectors and couplings to be compression type.

4. Flexible Metallic Conduit: Connectors to be insulated. Metallic connectors (except for liquid-tight) shall be steel “squeeze” type via a screw, Steel City XC-90X and XC-49X series. Liquid-tight metallic connectors shall be watertight approved for such use.

5. Bushings: Metallic insulated type. Weatherproof or dust-tight installations; liquid-tight with sealing ring and insulated throat, OZ/Gedney type “KR”.

6. All box connectors to be insulated throat type.

7. Conduit Straps: Galvanized steel, 2-hole straps. 1-hole straps may be used for conduit sizes 1” and smaller concealed in wall or above ceiling.

G. Metallic conduits, raceways, and fittings shall be listed and approved as grounding means.

2.2 BOXES
A. Boxes located outdoors, or in wet or damp locations shall be rated cast type with gasketed plates.

2.3 WIRES
A. Wire shall be copper only, manufactured by General Cable Co., Rome, General Electric Co., or Anaconda. Wire shall have type THW, THWN or XHHW insulation.

Wire installed in high temperature areas, including branch circuits in ballast enclosures shall have type RHW-2 or XHHW-2 90 insulation.

B. Wire shall Code type copper wire of not less than 98% conductivity. Wires #8 gauge and larger, shall be stranded. Wire shall bear the Underwriters’ label, be color coded and be marked with gauge, type and manufacturer’s name on 24 centers. Wires smaller than #8 may be solid or stranded. Where stranded wire is used, provide solid pigtail for connection to screw terminals of receptacles, switches, etc.

Page 213 of 412 ends

General Vang Pao Park Section 16100
February 2026 Basic Materials and Methods
16100-3
C. Switch legs shall use the same branch circuit phase color coding which they are connected to.

D. Bring wires to job in original unbroken packages.

2.4 CONVENIENCE OUTLETS
A. Shall be “Specification” grade rated 20 amperes at 125 volts, composition base with slots to accommodate parallel plug caps with grounding peg. Contact shall grip both sides of plug prongs. Outlet shall be UL listed.

B. Receptacle Hubbell A-H P&S Leviton
20A duplex GFI. GF5352 GF5242 2091S 6898
C. Weatherproof covers for receptacles shall be of heavy-duty die cast construction, selfclosing type with hinged flip-lids and gasket. Each receptacle in a duplex receptacle shall have an individual lid. While-in-use rated covers shall be used at all locations.

D. Provide a separate GFI duplex receptacle at each location identified on the drawings.

Through wiring is not acceptable.

2.5 SAFETY/DISCONNECT SWITCHES
A. Type “HD” Heavy-Duty safety switches with externally operated handle. Switches shall be manufactured by Westinghouse, General Electric, Square D or approved equal. Switches shall be rated 250 and 600 volts, A.C., of size and poles as shown on drawings and as required. Disconnects used outdoor shall be in NEMA-3R. Provide fused switches with proper sized fuses where required by equipment manufacturer.

All switches shall have pad-locking cover with cover interlock. Label switch per section 16050.

2.6 PULL LINE
A. Furnish and install pull line in all unused (empty) raceways. 1/8 diameter braided line of polypropylene or Jet-Line #232, or approved equal line of continuous fiber polyolefin. Minimum break strength, 200 lbs.

B. Provide pull line in conduits for utility company systems, size and type per their requirements.

2.7 PRECAST CONCRETE PULLBOXES/HANDHOLES
A. Boxes shall be size as indicated on the drawings. Design loads shall consist of live, dead, impact hydrostatic, and other loads. Design loads shall be sixteen KIPS.

Concrete shall be per ASTM-C-33-64. Lightweight concrete shall conform to ASTMC-33-64T. Cement shall be Portland Cement meeting ASTM-C-150 Type II standards. Compressive strength shall be minimum 4,000 psi at 28 days.

Page 214 of 412 ends

General Vang Pao Park Section 16100
February 2026 Basic Materials and Methods
16100-4
B. Boxes: Precast high-density reinforced concrete with end and side knockouts, and extension as required. Minimum 1-1/2 wall thickness. Acceptable manufacturers shall be Forni, Christy or equal.

C. Covers: Reinforce concrete covers shall have hold-down bolts. All covers shall be factory marked, see drawings for marking/label required. If not noted, use the following markings:

SYSTEM MARKING
Power 600 volts or less Electrical
Telephone Telephone
Lighting Lighting
D. Installation

1. Excavate around area to accept box, a minimum of 4 around all sides for ease of installation. Provide 12 of compacted pea gravel for bedding and/or to facilitate drainage.

2. Backfill shall be concrete.

3. Grout and seal conduits at box entry with cement. Provide with end bells.

E. Utility Company boxes shall be per their requirements. Provide with ground rod as required.

2.8 LIGHTING CONTACTORS
A. Contactors shall be UL listed, electrically operated, for all types of lighting loads.

Short circuit withstand rating shall exceed maximum available short circuit amps.

Coil voltage shall match control voltage. Square-D class 8903 type LO (electrically held) or equal.

B. Contactors shall be installed on vibration isolators.

2.9 GROUND RODS
A. Ground rods shall be æ in dia. X 10 ft. copper clad steel.

2.10 SERVICE PEDESTAL
A. Pedestal enclosures shall be fabricated from 12 gauge hot dipped galvanized steel.

Internal parts shall be fabricated from 14 gauge cold rolled steel. The pedestal shall be of all welded construction with welding materials specifically designed for the material used. All fasteners, hinged, latches and hardware shall be of stainless steel and hinges shall be continuous piano style. There shall be no exposed nuts, bolts, screws, rivets, or other fasteners on the exterior.

B. Pedestals shall be NEMA 3R and NEMA 12 with fully framed side hinged outer doors with swaged close tolerance sides for flush fit with top drip lip and closed cell

Page 215 of 412 ends

General Vang Pao Park Section 16100
February 2026 Basic Materials and Methods
16100-5
neoprene flange compressed gaskets. The door shall have 2,000 lb. stress rated stainless steel hasp, welded to cabinet and door. The pedestals shall have hinged deadfront panel with º turn latch and knurled knobs. Deadfront shall be hinged on the same side as the front door and shall open on a minimum of 102.

C. Pedestal finish shall be dry powder polyurethane plastic electrostatically applied to produce a finish of 3 to 5 mils thickness. The coating shall be commercially smooth, substantially free of flow lines, paint washout, streaks, blisters and other defects that would impair serviceability or detract from general appearance.

D. Panel shall include circuit breakers for each load with through-deadfront operating handles. Provide facilities for power company watt hour meter.

E. Provide terminal blocks for all wiring connections. Bundle and neatly install wiring in panel.

F. Provide pedestal mounting kit of standard design by control panel manufacturer for bolting to concrete slab.

G. Provide thermostatically controlled condensation heaters to help keep moisture from condensing in control panel.

H. Provide a 120V light with switch, to light up inner door and provide a weatherproof 20- ampere duplex receptacle.

I. Provide lightning arrester or surge suppressors to protect control equipment from lightning induced surges or high voltage transients.

J. Provide additional equipment and controls as indicated on drawings.

K. Current transformers and metering shall be as required by Power Utility company.

All equipment shall be factory installed by the switchboard manufacturer.

L. Make provisions for the installation of utility's metering equipment and entrance conductors, all in strict conformance with the requirements of the utility company and as shown on the Drawings. Pedestal manufacturer shall be held to have submitted shop drawings of the service entrance and metering provisions to the Utility prior to manufacture. Owners Representative's shop drawing approval does not imply conformance with utility requirements. Provide for off site metering if required by the local serving utility company.

M. Small wiring, necessary fuse blocks and terminal blocks within the board shall be furnished when required. All groups of control wires leaving the switchboard shall be provided with terminal blocks with suitable numbering strips. All hardware used on conductors shall have a high tensile strength and an anti-corrosive zinc plating.

Page 216 of 412 ends

General Vang Pao Park Section 16100
February 2026 Basic Materials and Methods
16100-6
N. A one-piece copper ground bus complete with lugs shall be furnished firmly secured to each vertical section structure and shall extend the entire length of the switchboard and shall be front accessible.

O. Ground bus current rating to be same as main device.

P. Pedestal main and distribution circuit breakers shall be molded case bolt-on type with trip rating as scheduled on Drawings.

Q. Pedestal shall be labeled to serve as "Service Entrance Equipment".

R. Each circuit breaker shall be identified with an engraved laminated phenolic plate showing the load served or the function of the circuit breaker and trip rating. The nameplate shall be attached with oval head machine screws tapped into the front of the board. Equip breaker handles with padlocking "lock-off" devices.

S. Pedestal shall be completely factory assembled, wired and tested before delivery and shall conform to UL where applicable, WUESSC, National Electrical Code Standards and State of California requirements.

T. Where pedestal has facilities for revenue metering, comply with the requirements of servicing utility company. Provide heaters with control thermostat to maintain temperature of 55 degrees Fahrenheit minimum inside switchboard.

U. The board shall be as manufactured by Tesco or approved equal.

PART 3 EXECUTION

3.1 CONDUITS
A. All Exposed Conduits shall be rigid steel or IMC. Obtain Architect approval prior to installing any exposed conduits.

B. Provide flexible connections of short length to equipment subject to vibration or movement and to all motors. Provide a separate bonding conductor in all flexible connections. Flexible conduit shall be one continuous length with couplings.

C. Support conduit with straps and secure to concrete by means of insert or expansion bolts. Expanders and shields shall be steel or malleable iron.

D. Conduits installed in contact with ground shall be PVC-40 conduits.

1. Install PVC conduit in a 2 sand or fine earth envelope below ground. Provide a minimum of 2 of sand or fine earth bedding at the bottom of the trench before laying conduits. Risers, including elbows, shall be double-wrapped rigid steel or PVC coated rigid steel conduit; except that risers, including elbows and bends; at in-ground pull box locations shall be PVC-40, concrete encased.

Page 217 of 412 ends

General Vang Pao Park Section 16100
February 2026 Basic Materials and Methods
16100-7

2. When installing underground conduits to specified depth, depth shall be taken from the top of the conduit to the finished grade level. Unless otherwise specified, underground conduits shall be installed with topside not less than 24 below finished grade.

3. Utility Company (electric, telephone, etc.) conduits shall be installed per their depth and backfill requirements. Minimum depth shall be 24 below finished grade. Minimum conduit shall be PVC-40. Where the utility company allows use of a “lesser” grade conduit, i.e. DB120, PVC-40 shall be used.

4. The minimum size of conduits shall be 1.

5. Bends shall be wide sweeping type with radius equal to 10 times O.D. and minimum 24 inch.

6. Place a 6 wide non-biodegradable plastic tape at 12 below grade, labeled “CAUTION ELECTRIC LINE BURIED BELOW”. Fluorescent red for electric power conduits and fluorescent orange for telephone conduits. Tape shall be continuous for full length of trench.

E. Although circuiting is shown as diagrammatic, their point-to-point destinations and their indication above/below ground route shall be followed as much as possible.

Where site conditions dictate that an alternate means of routing will alleviate conflicts, the alternate means will be considered with prior approval by the Architect.

Route conduits below paved roadways where possible.

F. Feeder conduits connected to panels/switchboard shall have ground lug bushing connected to equipment ground bus.

3.2 CAPPING
A. Cap conduits during construction with manufactured seals. Swab out conduits before wires are pulled in.

B. Cap all empty conduits below grade and in pull boxes with manufacturer’s caps to prevent entrance of water and debris, attach pull string to cap.

3.3 CONDUCTORS
A. Splices and joints shall be made with Burndy, T & B or approved equal, solderless tool applied pressure lugs and connectors, Uninsulated lugs and wire ends shall be insulated with layers of plastic tape equal to insulation of wire and with all irregular surfaces properly padded with “Scotchfil” putty tape prior to application of tape. Tape shall equal to Scotch #33, General Electric #AW-1 or approved equal. Feeder splicing is not permitted.

B. Conductor splices below grade where approved shall meet ANSI C119.1-1986 and UL 486D standards. Raychem RVA or RVC series. Conductors to be joined with compression sleeve connectors.

Page 218 of 412 ends

General Vang Pao Park Section 16100
February 2026 Basic Materials and Methods
16100-8
C. Use only UL approved wire pulling compound as lubricant.

D. Lace conductors together with waxed linen lacing cord, T &B “Ty-Rap”, Holub “Quik-Wrap” or equal, in a neat and workmanlike manner in panelboards, wireways, raceways, pull boxes and similar locations.

E. #10 AWG wire shall be minimum size wire used.

F. All conductors shall be in conduit unless otherwise indicated.

G. Conduit sizes shall be based on code fill table for THW insulated wires to accommodate the number, size and type of wires shown or specified.

H. Wiring installed in pull boxes or junction boxes, shall be pulled through without splices shall have a service loop around the interior of the box for 360 degrees utilizing the largest circumference.

I. Where conductors are increased in size and number (such as for voltage drop reasons), and such that conductors will not fit the standard breaker or panel lugs, terminate in one of the following manners:

1. Provide larger breaker frame.

2. Provide oversized lugs.

3.4 GROUNDING
A. Ground fittings shall be approved manufactured type, installed and connected conform with Code requirements.

B. Neutral conductors and noncurrent-carrying parts of equipment at each installation shall be grounded in accordance with applicable code. Ground conductor shall be copper having a current capacity sized in accordance with CEC.

C. All equipment cases, equipment frames, etc., shall be completely grounded to satisfy requirements of CEC. Install bond wire in flexible conduit. Install copper bond wire, sized in accordance with CEC, in all nonmetallic raceways and bond to all metallic parts using approved fittings.

D. Service ground conductor shall be connected to “Ufer” electrode, concrete encased ground, per CEC 250.

E. Ground resistance shall not exceed 25 ohms as measured at MSB.

F. All connections shall be made with solderless connectors or molded fusion-welding process.

G. Equipment grounding conductors shall be insulated with a continuous green outer finish along its entire length. Conductors size #4 AWG and larger may be identified (with green electrical tape applied half-lapped) at each end and at every point where the conductor is accessible.

Page 219 of 412 ends

General Vang Pao Park Section 16100
February 2026 Basic Materials and Methods
16100-9
H. Insulated grounded (neutral) conductors shall be identified with a continuous white outer finish along its entire length. Neutral conductors #4 AWG or larger can be identified by a distinctive white marking (applied half-lapped with white electrical tape) for the last 12 inches at each end.

I. Where equipment is 1000 volts or above, fence grounding shall be provided with a ground rod at each fixed gate post and at each corner post. Attach #4 ground wire exothermic weld to ground rod, and with compression ground post clamp to post.

Each gate shall be bonded to its gatepost by flexible braided copper strap.

3.5 FIELD TESTS
A. Provide required labor, materials, equipment and connections to perform tests.

Document results and submit them to the Owners Representative. Repair or replace all defective work.

B. Perform Megger test on all feeders and motor branch circuits.

C. Verify operation of all controls and adjust time settings per Architect.

D. Each ground rod shall be tested. A ground rod which does not have a resistance to ground of 25 ohms or less shall be augmented by one additional ground rod at no less than 8 ft. from each other.

E. CLEANING
F. Brush and clean work prior to concealing, painting and acceptance. Performed in stages if directed.

G. Clean and repair soiled or damaged painted exposed work and match adjoining work before final acceptance.

H. Remove debris from inside and outside of material, equipment and structures.

END OF SECTION

Page 220 of 412 ends

General Vang Pao Park Section 16500
February 2026 Lighting
16500 - 1
SECTION 16500

LIGHTING
PART 1 GENERAL

1.1 SECTION INCLUDES
Furnish and install a complete lighting system consisting of overhead luminaires, structural lighting and appurtenances as show on drawings and specified.

1.2 WORK INCLUDED
A. The requirements of Sections 16050, 16100 apply to the Work of the Section.

1.3 SUBMITTALS
A. ground information, photometric data, fixture efficiency, ballasts information, lamp information, weights, accessories, etc.

B. Submit per Submittal Specification Section
PART 2 PRODUCTS

2.1 LUMINAIRES
A. Weatherproof fixtures shall have weatherproof gaskets on fixture trim and door assemblies. Fixture shall be UL listed for wet locations.

B. Luminaire voltage indicated on the plans is for reference. Verify actual voltage required based on the branch circuit.

C. Housing shall be prefinished. Color to be selected by Architect.

2.2 LIGHT POLES
A. Poles shall be as shown on the drawings with a minimum wind rating 90 mph with a

1.3 gust factor. Base dimensions shall be as directed by the structural engineer at each pole location.

B. Reflector optical systems shall be high reflectance prefinished.

PART 3 EXECUTION

3.1 INSTALLATION
A. Mounting of luminaires shall be in strict accordance the CEC Section 410.

Page 221 of 412 ends

General Vang Pao Park Section 16500
February 2026 Lighting
16500 - 1
B. Install per manufacturer’s specifications for all specified (or approved equal) products.

END OF SECTION

Page 222 of 412 ends

General Vang Pao Park Section 265600
February 2026 Exterior Lighting
265600-1
SECTION 265600

EXTERIOR LIGHTING
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Exterior luminaires.

2. Poles and accessories.

3. Pole base foundation covers.

1.3 DEFINITIONS
A. CCT: Correlated color temperature.

B. CRI: Color-rendering index.

C. Luminaire: Complete lighting fixture, including ballast housing if provided.

D. Pole: Luminaire support structure, including tower used for large area illumination.

E. Standard: Same definition as "Pole" above.

1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.

1.5 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For luminaires to include in emergency, operation, and maintenance manuals.

Page 223 of 412 ends

General Vang Pao Park Section 265600
February 2026 Exterior Lighting
265600-2
PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, product(s) indicated on Drawings.

2.2 GENERAL REQUIREMENTS FOR LUMINAIRES
A. Luminaires shall comply with UL 1598 and be listed and labeled for installation in wet locations by an NRTL acceptable to authorities having jurisdiction.

B. Metal Parts: Free of burrs and sharp corners and edges.

C. Sheet Metal Components: Corrosion-resistant aluminum unless otherwise indicated. Form and support to prevent warping and sagging.

D. Housings: Rigidly formed, weather- and light-tight enclosures that will not warp, sag, or deform in use. Provide filter/breather for enclosed luminaires.

E. Luminaire Finish: Manufacturer's standard paint applied to factory-assembled and -tested luminaire before shipping. Where indicated, match finish process and color of pole or support materials.

PART 3 - EXECUTION

3.1 LUMINAIRE INSTALLATION
A. Comply with CEC Article 402.

B. Fasten luminaire to indicated structural supports.

1. Use fastening methods and materials selected to resist seismic forces defined for the application and approved by manufacturer.

3.2 POLE INSTALLATION
A. Clearances: Maintain the following minimum horizontal distances of poles from surface and underground features unless otherwise indicated on Drawings:

1. Fire Hydrants and Storm Drainage Piping: 60 inches.

2. Water, Gas, Electric, Communication, and Sewer Lines: 10 feet.

3. Trees: 15 feet from tree trunk.

B. Foundation-Mounted Poles: Mount pole with leveling nuts and tighten top nuts to torque level recommended by pole manufacturer.

Page 224 of 412 ends

General Vang Pao Park Section 265600
February 2026 Exterior Lighting
265600-3

1. Use anchor bolts and nuts selected to resist seismic forces defined for the application and approved by manufacturer.

2. Grout void between pole base and foundation. Use non shrink or expanding concrete grout firmly packed to fill space.

3. Install base covers unless otherwise indicated.

4. Use a short piece of ½ inch diameter pipe to make a drain hole through grout. Arrange to drain condensation from interior of pole.

C. In areas where pole are subject to severe damage, pole foundation shall be set at 3 feet above finished grade.

3.3 FIELD QUALITY CONTROL
A. Inspect each installed fixture for damage. Replace damaged fixtures and components.

B. Illumination Observations: Verify normal operation of lighting units after installing luminaires and energizing circuits with normal power source.

1. Verify operation of photoelectric controls.

END OF SECTION

Page 225 of 412 ends

General Vang Pao Park Section 265670
February 2026 Solar Powered Path and Sport Lighting
Rev. 1.7 November 11, 2024 265670-1 SOLAR POWERED EXTERIOR LIGHTING SECTION 265670

SOLAR POWERED PATH AND SPORT LIGHTING
PART 1- GENERAL

1.1 SUMMARY
A. Section Includes:

1. Solar Powered Outdoor Lighting

1.2 REFERENCES
A. International Electrotechnical Commission

1. IEC 61730-1:2019

2. IEC 61215-2:201

3. IEC/EN 61000-3.2

1. IEC/EN 61000-3.3

2. IEC/EN 62493

3. IEC/EN 62031

4. IEC/EN 62471

5. IEC/EN 61347-1

6. IEC/EN 61347-2-15
B. International Organization for Standardization (ISO)

1. 9001-2015 – Quality Management Systems
C. European Standards

1. CE/Rohs

1.3 DESCRIPTION - DEFINTIONS
A. “System Location” is the exact location of the system installation. The geographic coordinates are used to determine anticipated Solar Insolation.

B. “Solar Insolation” is the amount of solar radiation available at the geographic location. Properly designed systems will use the lowest minimum monthly average (typically December in the Northern Hemisphere) when calculating the Array size.

C. “Photovoltaic or PV” a method of converting solar radiation energy into direct current electricity.

D. “Lighting Profile” is the way in which the LED Luminaire is powered throughout the night accumulating to give the total energy used by the system. This is sometimes referred to as the dimming profile as luminaries can be set to dim the light output for a portion of the night to reduce the total energy load of the system.

E. “Photovoltaic Panel Tilt Angle” – The angle relative to horizontal, to which the PV panel is tilted while pointing towards the equator. Tilt angle influences the amount of energy that can be collected at a given location at specific time of year.

F. “LED Luminaire” is a complete lighting fixture housing solid state lights, lens optics, and heat sink.

G. “Luminaire Wattage” is the energy used by the luminaire to produce light. Used in the calculation of the system load.

H. “Light Distribution” are general IES classification for different types of optics used to project the light emitted from the LED. Each type projects the light in different ways which allows designers to optimize the light uniformity for a given area.

I. “Light uniformity” is how well the light from multiple luminaires is distributed over a given

Page 226 of 412 ends

General Vang Pao Park Section 265670
February 2026 Solar Powered Path and Sport Lighting
Rev. 1.7 November 11, 2024 265670-1 SOLAR POWERED EXTERIOR LIGHTING photometric study area. Typically, a ratio of the (maximum or average) amount of the light projected on the area and the minimum light value calculated within the area.

J. “IES LM 79” – is a standardized test which measures total luminous flux, luminous intensity distribution, electrical power, efficacy (lumens per watt delivered), and color characteristics (chromaticity, CCT, and CRI) of the complete luminaire. This test must be done by an accredited independent laboratory.

K. “Color Temperature” – measured in Kelvin, denotes how warm or cool the color produced by the luminaire is. Typically, 3000k-4000K.

L. “Batteries” – how the energy produced by the PV array is stored for nighttime use to power the luminaire load.

M. “SOC” is level of charge of an electric battery relative to its capacity.

N. “Anti-Blackout” – Load management based on battery state of charge.

1.4 SUBMITTALS
A. Specification Conformance Document:

Manufacturing will provide documentation system complies with all technical specification requirements in order to be considered compliant with bid submittals.

B. Product Data: Catalog cut sheets with performance specifications demonstrating compliance with specified requirements.

C. IES electronic files of lamp output and/or Photometric Plots on a surface from a defined lamp height compliant with IES LM-79. Winter light level should be noted with files and/or reflected in any lighting plots.

D. LM-79 and report for chosen Luminaire confirming efficacy values.

E. Calculation of Effective Projected Area (EPA) and weight of the solar lighting system, and EPA rating of the pole (if provided).

F. System Calculation

1. Photovoltaic Array Sizing.

2. Luminaire load.

3. Depth of Discharge
G. Line drawing or photograph of lighting system(s).

H. Wiring diagram(s).

I. References of at least 10 installation sites for the submitted manufacturer.

J. Installation Instructions.

K. Passed testing results

1.5 QUALITY ASSURANCE
A. Manufacturer: Minimum 10 years of experience in manufacture of solar powered lighting systems.

B. Minimum of 150,000 of the same solar lighting platform previously installed.

C. Manufacturer must demonstrate sufficient financial reserves to satisfy all outstanding warranty liability.

D. Solar lighting as a system must have successfully completed testing by an independent United States laboratory

1. Solar lighting manufacturer must provide completed and passed testing results in the submittal package

1.6 SAFETY COMPLIANCE
A. Photovoltaic Panel is Nationally Recognized Testing Laboratory listed per UL/CSA 1703 or IEC 61730- 1:2019 & IEC 61215-2:2017.

Page 227 of 412 ends

General Vang Pao Park Section 265670
February 2026 Solar Powered Path and Sport Lighting
Rev. 1.7 November 11, 2024 265670-1 SOLAR POWERED EXTERIOR LIGHTING B. Luminaire approved by a Nationally Recognized Testing Laboratory.

1.7 OTHER COMPLIANCES
A. Battery shall be considered non-dangerous goods by the ICAO, IATA, IATA special Provisions A199, and IMDG

1.8 PROJECT CONDITIONS
A. Ambient temperature: -40° to 70° C. (-40°F to 156°F) B. Pole and all coupling components exceed maximum specified EPA ratings required for local wind loading conditions.

C. Pole foundations will be designed or reviewed my local engineering firm to ensure local building codes are followed.

1.9 PERFORMANCE AND SOLAR CALCULATIONS
D. Sizing Criteria and Project Requirements for Olivehurst, CA:

1. Sun Hours (Insolation) based on global coordinates: 2.15kWh/m² per day.

2. Longest Night: 14.48 hours

3. Latitude: 39.0954° North / Longitude: -121.5522° East

4. Singles: Must be able to demonstrate through solar study, energy calculations, and system sizing the ability to achieve a minimum of 31W for 4 hours post-dusk, 1 hour pre-dawn, and 20% during the in between hours.

5. Twins: Must be able to demonstrate through solar study, energy calculations, and system sizing the ability to achieve a minimum of 30W for 4 hours post-dusk, 1 hour pre-dawn, and 20% during the in between hours PER FIXTURE.

6. Luminaire Temperature: Must have all luminaire CCT options of ≤ 3000K, or ≤ 4000K

7. LED driver must be integrated with the solar charge controller as one unit.

E. Manufacturer shall submit detailed information on how the sizing was calculated including the formula with details on all factors included. Sizing shall demonstrate that the worst case SOC will support the proposed light level all year long.

F. Manufacturer shall provide a photometric layout meeting the specified standard or the specified light levels and uniformity. Light Loss Factor shall be consistent with specification.

G. Photometry must be based on “worst case” calculated light levels in winter – accounting for any anticipated Anti-Blackout or Energy Management adjustments

1.10 WARRANTY
A. Provide manufacturer’s non-prorated warranty covering 8 full years parts and labor on entire solar lighting system including battery from date of purchase.

1. Local support can be provided by the manufacturer or their trained and authorized representative.

B. Solar Voltaic Panel covered for minimum 25 years for power output.

1.11 REGULATORY REQUIREMENTS

1. CE

1.12 BATTERY STORAGE AND SHIPPING
A. Batteries non-hazardous and approved for shipping via ground, air, or sea.

B. If storing batteries for future installation: must be stored inside above in a temperature-controlled environment.

Page 228 of 412 ends

General Vang Pao Park Section 265670
February 2026 Solar Powered Path and Sport Lighting
Rev. 1.7 November 11, 2024 265670-1 SOLAR POWERED EXTERIOR LIGHTING C. If batteries are stored for longer than 4 months past the date received, they will need to be recharged before being installed to ensure battery and system performance.

PART 2- PRODUCTS

2.1 SYSTEM – General Design
A. Basis of design product: PV System will be attached at the top of the pole with an integrated or separately mounted battery container.

B. Manufacturers: Fonroche Lighting America, Forest Hill, TX Contact: [email protected] | 339-225-4530
C. Substitutions:

1. All proposed substitutions must be submitted in writing for approval by the design professional a minimum of 10 working days prior to the bid date and must be made available to all bidders.

2. Singles: All proposed substitutes must be accompanied by documentation the system uses NiMH battery technology of ≥624Wh, ≥160W solar collection, has polycarbonate plug-n-play power center, LoRa central control capabilities with >50,000 connected units, solar study of system consumption & production curves for Olivehurst, CA solar irradiance, ≥180lm/watt light fixture with independent lab test results, and conducts climatic chamber, dedicated battery, module, & cell testing in various environmental conditions.

3. Twins: All proposed substitutes must be accompanied by documentation the system uses NiMH battery technology of ≥1248Wh, ≥310W solar collection, has polycarbonate plug-n-play power center, LoRa central control capabilities with >50,000 connected units, solar study of system consumption & production curves for Olivehurst, CA solar irradiance, ≥180lm/watt light fixture with independent lab test results, and conducts climatic chamber, dedicated battery, module, & cell testing in various environmental conditions .

2.2 GENERAL – Solar Powered Light Systems
A. Solar Powered Light System consists of six (6) components and assemblies: (1) Photovoltaic (PV) Module(s) (2) Mounting structure, (3) LED Luminaire, (4) Sealed Power Center (5) Weatherproof Wire Harnessing (6) Pole. Luminaire and PV assemblies shall be separate units, allowing for independent orientation of both the lighting and solar panel to achieve optimal performance.

System will at a minimum include the following characteristics.

1. Photovoltaic (PV) Module
a. Construction:
1) Crystalline silicon solar cells Rated at Minimum 160W for Singles and 310W for Twins.
2) Aluminum Frame
3) UL/CSA 1703 or IEC 61730-1:2019 and IEC 61215-2:2017 4) Sealed behind UV stabilized tempered glass.
5) Black Frame and Backing Sheet for finished appearance. 6) Covered by a 25-year power output warranty.
7) RoHS compliant
8) Cabling will be UV resistant.
9) Water-tight wire junction box on PV module
10) Mount assembly shall be galvanized, and powder coated with adjustable tilt from 10 degrees to 45 degrees to optimize system performance and EPA. b. Performance:
1) PV electrical junction box and connectors (MC4 type) are sealed per IP 67. 2) PV is fastened to support system at a minimum of four locations.

Page 229 of 412 ends

General Vang Pao Park Section 265670
February 2026 Solar Powered Path and Sport Lighting
Rev. 1.7 November 11, 2024 265670-1 SOLAR POWERED EXTERIOR LIGHTING

2. LED Luminaire
a. Design and dimensions
1) Fixture to be decorative “Opera” style pendant, flaring at a straight angle from the top smaller diameter to the larger bottom diameter
2) Fixture to be 19.5” high x 17.5” diameter (at bottom of luminaire) b. Construction
1) Housing: Cast Aluminum Alloy alloy with decorative housing 2) Heat Sink: Extruded Aluminum Integrated in LED Module 3) LED Module impact rating of IK09
4) LED Module Ingress Protection IP68
5) Finish: Powder Coated Marble Rose or Bronze Roman
c. Performance:
1) 4000K temperature.
2) Efficacy 180 – 190 lumens per watt
3) DarkSky International Compliant (at 3000K)
4) The manufacturer provides relevant .IES files to indicate light dispersion and intensity of LED source.
d. Certifications
a) IEC/EN 55015 -
b) IEC/EN 61547 -
c) IEC/EN 61000-3.2-
d) IEC/EN 61000-3.3 -
e) IEC/EN 62493
f) IEC/EN 62031 -
g) IEC/EN 62471-
h) IEC/EN 61347-1 -
i) IEC/EN 61347-2-15
e. Warranty
1) 8-year full, non pro-rated warranty

3. Power Center shall be sealed, pre-loaded with batteries and fully pre-wired. a. Construction:
a) Enclosure
. Enclosure shall be IP65 and provide an IP68 screw in valve to safely relieve pressure inside the enclosure. Valve shall be waterproof, oilproof, breathable, UV Resistant with anti-vibration.
. The power center enclosure shall be separate and independent from the solar panel to allow for proper ventilation.
. Enclosure shall be high strength polypropylene with anti-UV treatment. . The power center shall be connected to the panel and lighting fixture(s) with two, external waterproof connectors.
. Holds from one to four battery packs for a total weight of no more than 50 LBS. b) Controls
. LED driver must be integrated with the solar charge controller as one unit. . Charge controller/ LED driver must be capable of controlling and dimming one or two outdoor luminaries.
. Control circuit board shall have a protective conformal coating.

Page 230 of 412 ends

General Vang Pao Park Section 265670
February 2026 Solar Powered Path and Sport Lighting
Rev. 1.7 November 11, 2024 265670-1 SOLAR POWERED EXTERIOR LIGHTING . Over Voltage Protection.
. Internal PV Disconnect
. Reverse battery polarity protection.
. Self-calibrating load, timing, and charging circuitry. . Charge Controller operates with temperature compensated limits ensuring battery charging algorithm protects battery (ies) from over and under voltage stress.
. Charge controller adapts maximum (charged) voltage based on temperature.
. Charge controller prevents discharge below battery Low Voltage Disconnect (LVD) limit.
. Battery Management Function to balance cells.
. Anti-Blackout Protection
c) Singles Battery Minimum Capacity 624 Whrs
. Battery shall be maintenance free NiMH or Nickel Metal Hydride . Air shippable.
. Battery shall be rated “Non-Hazardous” by ICAO/IATA/DOT. . 100% recyclable.
. Battery must be built to comply with UL 2054.
. Formulated for charging and operating temperature from -40°C to +70°C d) Twins Battery Minimum Capacity 1248 Whrs
. Battery shall be maintenance free NiMH or Nickel Metal Hydride . Air shippable.
. Battery shall be rated “Non-Hazardous” by ICAO/IATA/DOT. . 100% recyclable.
. Battery must be built to comply with UL 2054.
. Formulated for charging and operating temperature from -40°C to +70°C b. Performance
1) Able to perform for duration of at least 3650 cycles. 2) Operates in the prescribed Lighting Profile as per the Performance and Solar Calculations found above in 1.9.
3) Able to provide all night lighting 365 nights per year. c. Wire Harnessing Wire Harnesses Construction
1) All UV stabilized jacketed wiring and connectors.
2) Provided with weather tight enclosures.
3) Provided in variable lengths to eliminate all field wiring. d. Wire Harness Performance:
1) Sealed gasketed connectors prevent dust intrusion.

4. Solar Lighting Pole, PV Structure pole
a. Construction:
1) Overall Length will be long enough to accommodate luminaire mounting height with enough clearance for the PV panels to be positioned correctly without contacting the mounting arm.
2) Poles and brackets will be constructed out of powder coated galvanized steel, which

Page 231 of 412 ends

General Vang Pao Park Section 265670
February 2026 Solar Powered Path and Sport Lighting
Rev. 1.7 November 11, 2024 265670-1 SOLAR POWERED EXTERIOR LIGHTING have been engineered to meet the weight and EPA requirements of the full system and applicable building codes.
3) Attached to an engineered concrete base.
4) Stainless steel or zinc plated steel hardware for rust-proof and corrosion resistant mounting equipment.
5) Pole meets ANSI C136.36A-2010, for Roadway and Area Lighting EquipmentAluminum Lighting Poles. b. Pole Performance:
1) Pole Design will meet engineering requirements based on the system’s weight, EPA and wind rating for that geographic locations.
2) Independently verified pole strength and base details by licensed Professional Engineer and Test Lab.
3) Pole manufacturer must be able to supply an anchor base pole in a 20’ option. c. System Support Structure Performance:
1) The PV support structure and battery cabinet shall mount to a 2.8575” OD X 6” Tenon

5. Arm
a. Construction: cast aluminum arm and adapter assembly. Arms will not have any exterior bolts or clamping devices.
b. 3.3’ in length
c. Finish: Same as pole
d. Mounting: Attachment point on pole will be relative to the final luminaire height as stated in the photometric design.

6. Solar lighting manufacturer must have the capability to provide two-way LoRa and cellular based wireless central system monitoring and control.
a. Controls must be based on cellular gateway, and each light point must include on-board LoRa radio.
b. Central monitoring and control must contain end user accessible web-based dashboard. 1) Web-based dashboard must include state of battery charge, system connectivity, CO2 reduction, and each light point must be visible on the portal map.

PART 3- EXECUTION

3.1 INSTALLATION
A. Install equipment in accordance with manufacturer’s installation instructions.

B. Provide complete installation of system in accordance with Contract Documents.

END OF SECTION

Page 232 of 412 ends

311000 - 1
General Vang Pao Park Section 311000
February 2026 Site Preparation
SECTION 311000

SITE PREPARATION
PART 1 - GENERAL

1.1 SECTION INCLUDES
A. Locate and mark existing utilities within the limits of work.

B. Remove existing trees, including root ball, within the area of work, as indicated on plan.

C. Remove existing surface improvements within the area of work as indicated on plan.

D. Remove existing subsurface utilities, including appurtenances, within the area of work, as indicated on plan.

E. Properly dispose of all excess and unsuitable material.

F. Strip all areas within the limits of work as indicated on the plan.

G. Deploy and subsequently remove temporary construction area and tree protection fencing at completion of construction.

H. Install and maintain erosion control measures.

1.2 RELATED SECTIONS
A. Earthwork - Section 312000
B. Trenching, Backfilling and Compaction - Section 312316

1.3 REFERENCES
A. Reference Data:

1. If the year of the adoption or latest revision is omitted from the designation, it shall mean the specification, manual or test designation in effect the date the Notice to Proceed with the work is given.

B. Caltrans Standard Plans and Specifications.

PART 2 - PRODUCTS – NOT USED
PART 3 - EXECUTION

3.1 TREE PROTECTION
A. Erect and maintain temporary fence around drip line of individual trees or around perimeter drip line of groups of trees to remain. Remove fence when construction is complete.

B. Do not store construction materials, debris, or excavated material within drip line of remaining trees.

C. Do not permit vehicles or equipment within drip line of remaining trees.

Page 233 of 412 ends

311000 - 2
General Vang Pao Park Section 311000
February 2026 Site Preparation
D. Do not excavate within drip line of remaining trees, unless otherwise indicated.

E. Where excavation for new construction is required within drip line of trees, hand clear and excavate to minimize damage to root systems. Use narrow-tine spading forks, comb soil to expose roots, and cleanly cut roots as close to excavation edge as possible.

1. Cover exposed roots with burlap and water regularly.

2. Temporarily support and protect roots from damage until they are permanently relocated and covered with soil.

3. Coat cut faces of roots more than 1-1/2-inches in diameter with an emulsified asphalt or other approved coating formulated for use on damaged plant tissues.

4. Cover exposed roots with wet burlap to prevent roots from drying out. Backfill with soil as soon as possible.

F. Also see Tree Protection requirements outlined on Construction Drawings.

RESTORATION
A. Restore damaged improvements to their original condition, as acceptable to the Owner.

B. Repair or replace trees and vegetation indicated to remain that are damaged by construction operations, as directed by the Owner.

1. Employ a qualified, licensed arborist, to submit details of proposed repairs and to repair damage to trees and shrubs.

2. Replace trees that cannot be repaired and restored to full-growth status, as determined by the Owner.

3.2 CLEARING AND GRUBBING
A. Install tree protective fencing around trees designated to be saved, prior to the start of demolition work. See Civil and Landscape Plans and Specifications. Install fencing as far from the trunk as possible to allow for construction of proposed improvements. Maintain fencing throughout duration of construction.

B. Use only hand methods for grubbing within drip line of remaining trees.

C. Do not remove trees, shrubs, and other vegetation indicated to remain or to be relocated.

D. The area above the natural ground surface shall be cleared of all vegetation such as trees not designated to be saved, roots, brush, grass, weeds, and all other objectionable material including buildings (footings, slabs, etc.), asphalt, concrete, curbs, mulch, headerboard, ramps, stairs, utility piping (including appurtenances), bike racks, fences/gates, site furniture, and similar materials, within the limits of construction.

E. All concrete and asphalt pavements and other existing improvements within the areas to be developed should be removed during site demolition. At the Contractor’s option, salvaged class 2 aggregate base material may be stockpiled for reuse.

F. Existing building foundations should be entirely removed below final subgrade in the building pad areas, and to a depth of at least three feet in areas outside the building footprints. The excavations beneath the planned building area should be backfilled with engineered fill. See also Section 312000.

G. The natural ground surface within the entire site, except within the tree protection zones, shall be grubbed to a depth necessary to remove all stumps, buried logs, roots over 2-inches in diameter, and all other unsuitable material. Stumps shall be removed to a depth of at least 24” below original grade.

H. Existing utilities designated to be removed that do not conflict with proposed improvements may be

Page 234 of 412 ends

311000 - 3
General Vang Pao Park Section 311000
February 2026 Site Preparation
abandoned in place. If they are abandoned in place, the utility shall be slurried and capped. Any portions of these utilities that conflict with the new improvements shall be removed.

I. All unsuitable material shall be removed from the construction area and disposed of properly. Comply with hazardous material abatement regulations that may apply.

3.3 DEMOLITION SEQUENCING
A. Permanent and/or temporary facilities may need to be installed prior to demolition to limit utility outages. Any planned and or necessary interruption of existing utilities shall be coordinated with the Construction Manager. A minimum of one week’s notice shall be provided before any such interruption.

3.4 STRIPPING
A. The upper soils containing grass, small roots, and other vegetation, to a depth of 4+/- inches, shall be stripped from and removed from the site. Deeper stripping may be required in localized areas to remove roots or other concentrations of organic material.

B. Dust control shall be performed by the contractor during all phases of the construction. Payment for the dust control work involved shall be considered included in the items of work and no additional allowance will be made therefor.

C. The Geotechnical Engineer will observe the clearing and stripping operations and recommend the maximum depth of stripping required and any additional excavation necessary due to contamination of materials or concentrations of vegetation.

D. All suitable stripped material in excess of those needed to backfill landscape and/or planter areas shall be removed from the project site and disposed of properly.

3.5 CLEARED MATERIAL
A. The objectionable cleared material including buildings (footings, slabs, etc.), curbs, mulch, headerboard, ramps, utility piping (including appurtenances), bike racks, fences/gates, site furniture, etc., shall be removed from the project site and disposed of properly.

3.6 STRIPPED MATERIAL
A. Excess and objectionable stripped material including asphalt and concrete pavements, grass/vegetation, etc. shall be removed from the project site and disposed of properly. Contractor is encouraged to recycle the existing aggregate base materials for use in hardscape areas only (nonbuilding).

3.7 EROSION AND SEDIMENT CONTROL
A. Install and maintain erosion control devices/measures, including, but not limited to drainage inlet protection, fiber rolls, silt fence, etc., until such time as all vegetative and hard surface improvements within their individual tributary areas are completed. Provide periodic maintenance of all such devices, and following completion of said improvements, remove and dispose of erosion control devices and repair surfaces to match final specified surface finishes.

B. Any areas where ground has been disturbed, and where final landscaping has not been installed, will require the installation and maintenance of erosion control devices by the Contractor, as generally noted in the Erosion Control Notes on the plans.

C. Additionally, the Contractor shall implement and adhere to the requirements of the Storm Water Pollution Prevention Plan (SWPPP), including, but not limited to, rain event inspections, storm water discharge sampling and analysis, vehicle/equipment maintenance, and cleaning, etc..

3.8 SURFACE IMPROVEMENT AND UTILITY REMOVAL AND RELOCATION

Page 235 of 412 ends
← All documents from this meeting