Cities Index.
K2 Proposal

City Council/Public Finance and Economic Development Authority/Parking Authority
June 15, 2026

Document
K2 Proposal
Meeting
June 15, 2026
Body
City Council/Public Finance and Economic Development Authority/Parking Authority
Original file
1.1 MB
Text extracted from the city's file for reading and search. Open the original on cityofmerced.legistar1.com. That file is the official record.

0 Merced Yosemite
Regional Airport (MCE)
Checkpoint Relocation Effort
May 15, 2026
Submitted to:

Karen Baker
Economic Development Associate, City of Merced
[email protected]

Submitted by:

Kathy Neiswender
President, K2 Security Screening Group
[email protected]

Merced Yosemite Regional Airport (MCE)

THIS PAGE IS INTENTIONALLY BLANK

Merced Yosemite Regional Airport (MCE)

TABLE OF CONTENTS
I. SCOPE SUMMARY ............................................................................................................................................................. 2 II. UNDERSTANDING THE WORK ..................................................................................................................................... 2 EQUIPMENT RELOCATION & DECOMMISSIONING ................................................................................................................. 2 PLANNING & SCHEDULE .................................................................................................................................................................... 2 III. PRICING .......................................................................................................................................................................... 3 IV. K2 QUALIFICATIONS .................................................................................................................................................. 4 INDUSTRY RELATIONSHIPS ............................................................................................................................................................. 5 V. THE K2 TEAM .................................................................................................................................................................... 6 VI. APPENDICES .................................................................................................................................................................. 9 APPENDIX A - PREVIOUS EXPERIENCE ........................................................................................................................................ 9

Merced Yosemite Regional Airport (MCE)

2 Confidential Pricing / Means and Methods
I. SCOPE SUMMARY
K2 Security Screening Group (K2 SSG) will manage the relocation of Transportation Screening Equipment (TSE) at Merced Yosemite Regional Airport (MCE). Leveraging deep expertise in aviation security operations, K2 SSG will oversee all project management activities, including detailed planning, subcontractor coordination, and government property accountability. Our approach ensures full compliance with TSA requirements while maintaining operational efficiency and minimizing disruption throughout the project lifecycle.

II. UNDERSTANDING THE WORK
K2 Security Screening Group (K2) will deliver a turnkey relocation and testing services for the Transportation Security Administration (TSA) passenger screening checkpoint at Merced Yosemite Regional Airport (MCE). K2 will furnish all labor, supervision, coordination, and equipment necessary to perform the relocation, reinstallation, and testing of one (1) CEIA WTMD and decommission / packaging / shipping of one (1) Smiths AT2 screening lane and associated ancillary equipment, in accordance with TSA requirements, OEM guidelines, and airport operational constraints. All work will be performed during approved work hours to minimize operational impacts.

EQUIPMENT RELOCATION & DECOMMISSIONING
The scope includes the relocation, reinstallation, and testing of the following equipment as required:
• One (1) CEIA walk-through metal detectors (WTMD) relocated • Two (2) Leidos B220 explosives trace detection (ETD) units relocated • One (1) Smiths Bottle Liquid Scanner (BLS) relocated
• One (1) Smiths AT2 X-ray systems decommissioned, packaged and shipped

PLANNING & SCHEDULE
The relocation will be executed over two days to maintain operational capacity, with schedule logic coordinated and confirmed with Smiths Detection.
• Day 1: Relocate (2) ETD, (1) BLS, (1) CEIA WTMD and test (1) CEIA WTMD; coordinate TSA shutdown / powerup on both ETDs and BLS.
• Day 2: Decommission, package and ship (1) Smiths AT2 and associated ancillary equipment in the old terminal security checkpoint.

CEIA WTMDs will undergo TSA performance testing and validation, including TSA Third Party Testing (TPT). TSA standard TPT approval processes typically require approximately 24 to 72 hours following completion of testing. To help mitigate potential delays to checkpoint opening and restore passenger screening operations as quickly as possible, K2 has coordinated with TSA TPT representatives to discuss an expedited approval process when conditions allow. This approach is intended to minimize downtime while maintaining full compliance with TSA requirements and approval protocols.
“Since 2009, K2 has provided
efficient and effective program
management support, which is
critical to mission success and
especially notable given that [the
TSA] is such a very dynamic
environment.”
— Anthony Tsantrizos,
Management and Program Analysis,
Transportation Security Administration

Merced Yosemite Regional Airport (MCE)

3 Confidential Pricing / Means and Methods
III. PRICING
The following section provides a detailed summary of our FFP pricing, outlining all major cost components and ensuring transparency for your review, along with assumptions and exclusions incorporated into the total value.

FFP PRICE PROPOSAL

ITEM DESCRIPTION PRICE
Project Management
All labor and onsite supervision are required to
plan, schedule, subcontract, and coordinate
the work. Includes relevant government
paperwork. Includes project closeout & as-built
redlines.
$16,316.07
Supervision &Travel
All onsite labor and travel expenses for a (1)
K2 Project Manager to coordinate and
supervise relocations / decom efforts.
$9,408.15
Rigging, OEMs & TPT
All rigging to relocate the existing WTMD, ETD
& BLS to the new checkpoint. Certified OEM
technicians to reinstall and test the WTMD.

Decommission, packaging and shipping of the
decommissioned Smiths AT2.
$33,481.00
FFP TOTAL $59,205.22

ASSUMPTIONS AND EXCLUSIONS
• Proposal pricing does include sales tax.
• This proposal does not include any specific labor utilization. • This proposal assumes that work will be performed on consecutive days, including weekends as necessary in one mobilization.
• No new equipment is included in this proposal (X-rays, AIT, ETD, BLS, CAT2). • No new FFE is included in this proposal (gates / barriers / tables mats / etc.). • The proposal assumes all other equipment / FFE not referenced in the relocate / decommission section will be relocated and anchored by other. • SIDA badging is not required; escorted access will be provided by the Owner. • Proposal excludes GPR scanning, and engineered anchorage calculations, K2 can provide pricing if desired.
• Assumes CAD background will be provided for K2 to update security checkpoint equipment to reflect as-built conditions.
• K2 will make every effort to relocate and test the WTMD within the requested timeframe; however, due to variables associated with equipment relocation, operational readiness and testing, the 2-hour window cannot be guaranteed.

Merced Yosemite Regional Airport (MCE)

4 Confidential Pricing / Means and Methods
IV. K2 QUALIFICATIONS
K2 Security Screening Group (K2) is a division of K2 Construction Consultants (K2-CCI). Our suite of services, high standards and excellent track record qualifies K2 as an industry leader in project management, project controls, solutions integration, scheduling, cost estimating, expert reports, and forensic claims management to the construction industry, with the security screening division specializing in passenger and baggage screening. Our work is focused on achieving tangible results for our clients, understanding there is a constant balance of schedule, scope, and cost. K2’s highly trained staff is experienced in all facets of the project life cycle on projects ranging from $10K to $20M and contributing to larger projects ranging from $20M to over $20B.

K2 has been performing TSA Critical Path Method (CPM) scheduling services, design and engineering services, installations, relocations and/or decommissions of checkpoints and baggage systems since 2001. Whereas other companies’ expertise is spread across many different areas, airport security screening work is what K2 focuses on - 100% of the time.

We have performed over a thousand Checkpoint and Checked Baggage installations and decommissions over the years – however, we believe we have created a particular expertise in new construction projects with cutting edge technology. Prior to installation, K2 works closely with TSA to ensure compliance with existing requirements/ regulations and vendors to assure the right equipment and configuration is ordered to best fit the customer’s needs and budget. K2 works with all likely vendors for new terminal security technology. We collaborate with each of the companies to ensure all gaps are filled, and any weak areas are closely monitored and supported from the design process to Go-Live.

A partial list of airports that K2 has provided SI services for is provided in Appendix A.

Our two-part goal is that your project is completed on time and exceeds your expectations.

Along with our technical qualifications, K2 is proud to be ISO 9001:2015 certified, demonstrating our commitment to maintaining the highest standards of quality management. This certification ensures that our processes are structured to consistently meet customer and regulatory requirements while driving continual improvement. By adhering to ISO 9001:2015 principles, K2 delivers reliable, efficient, and high-quality solutions that exceed stakeholder expectations.

Merced Yosemite Regional Airport (MCE)

5 Confidential Pricing / Means and Methods

INDUSTRY RELATIONSHIPS
Working with the TSA
K2 has worked with the TSA since its inception. We have years of practical experience with the TSA design team, donor team and executives. This relationship establishes a solid working foundation for the MCE project to benefit from. Our ability to provide best-in-class service is due in part to our strong relationship with TSA.
• K2 worked with the TSA to develop the Checkpoint Requirements and Planning Guide (CRPG) • Our Director of Engineering designs, reviews and/or modifies CP drawings for compliance in CAD, both 2D and 3D/BIM (Revit), to fast-track drawings through TSA approvals. • Our team members sit on boards of technology developers. • K2 attends TSA conferences, participates in TSA “Vendor Workshops”, and is an active contributor to the development of checkpoint design standards. • Our Equipment SME is the chairman of his local ASIS chapter and holds certifications in WTMDs, R&S QPS201 AIT, ETD hazardous disposal, and in TSA AT X-Ray upgrades. • Our team has planned, managed, designed, shipped, installed, and/or decommissioned over one thousand (1000) TSA Airport Projects.
• Our Airport/Local TSA SME is the former Federal Security Director of one of the largest airports in the world (LAX) with constantly changing CP/CB systems. • Our TSA Headquarters/New Technology SME was TSA’s executive who established and led TSA’s Innovation Task Force (ITF) bringing new technologies to the forefront for airports/airport operators.
• Our Program Manager is a former TSA Federal Security Director. • TSA often calls upon K2 to assist with solving difficult scenarios.

Working with Vendors
K2 coordinates with OEMs to assist customers with procurement decisions, brokering of sales, and to obtain additional technical information as necessary in the decision-making process.

K2 works with all TSE OEMs. Our diverse vendor partnering of CPSS/ASL and standard TSA systems include:
• Vanderlande ASL: Las Vegas (LAS)
• Scarabee: San Francisco (SFO), Houston (IAH)
• Analogic CPSS: LGA Terminal B&C, Atlanta (ATL), Newark (EWR), Miami (MIA), Philadelphia (PHL)
• Analogic Base and Mid-Size Units: Baltimore (BWI), Oakland (OAK), Los Angeles (LAX), John F. Kenney (JFK) and twelve (12) Cat II to IV sites in the Northeast Region. • Smiths/Mac-H & Rapiscan Mac-H Automatic Screening Lanes (ASLs) (Predecessor to CPSS):

Atlanta (ATL) North, South & Main Terminals, Minneapolis St. Paul (MSP), JFK Airport Terminal FIS, 2, 4 & 8 (JFK), LAX Terminal 7, 1, 3, 4, 5, TBIT, Port of Miami Terminal, Chicago O’Hare (ORD) Terminal 1
• MacDonald-Humfrey Legacy Version 1 ASL equipment – decom and re-installation • Smiths ATU/AT2 X-Ray, CT & Rapiscan ATU/AT2 X-Ray – 92% of U.S. Airports • K2 has designed, procured, shipped, rigged, installed and/or consulted on AND successfully opened over 170 ASL/CPSS passenger and employee screening lanes in the U.S. We have done so for four (4) major airlines and multiple construction companies, consortiums, and airport authorities.

Merced Yosemite Regional Airport (MCE)

6 Confidential Pricing / Means and Methods
V. THE K2 TEAM
The following is a list of our key management personnel including relevant experience and qualifications, roles, unique knowledge, etc. All the personnel listed below will be available should the need arise for the MCE project.

KATHY (YURKUNAS) NEISWENDER, K2 Principal & K2 SSG President Qualifications: Kathy (Yurkunas) Neiswender is President of K2 Security Screening Group. Under her 20-year leadership, the company has become a national leader in the planning, installation, and integration of advanced security screening equipment at airports across the country.

Since 2016, Neiswender has brought together the TSA, airports, airlines, port authorities, original equipment manufacturers (OEMs), construction companies, unions, and local businesses to produce some of the most outstanding new airport checkpoints in the country.

Her expertise in project controls, scheduling, and custom software development enables customers to bridge technology gaps, gather information quickly, and successfully execute complex security checkpoint projects. Most recently, Neiswender led major projects at New York’s LaGuardia Airport (LGA), Hartsfield-Jackson Atlanta International Airport (ATL), John F. Kennedy Airport (JFK), SFO, Los Angeles International Airport (LAX) and Salt Lake City International Airport (SLC).

Her alliance with the TSA Innovation Task Force (ITF) and long -standing relationship with the TSA Capability Acceptance Program (CAP) Office, along with her dedication to quality and on -time checkpoint openings, has been instrumental in the over 133 pieces of donated airport security equipment that K2 has brokered, purchased, shipped, installed, and/or managed. Because of this, K2 Security Screening Group is the country’s leading Systems Integrator in the installation of Automated Screening Lanes (ASLs) and Checkpoint Property Screening Systems (CPSS).

Resume: Prior to assuming her President position at K2, Neiswender consulted on complex projects at a number of large airports, including Miami International Airport (MIA) and Abu Dhabi International Airport (AUH). She is certified as a Planning & Scheduling Professional (PSP) and has been recognized by the Association for the Advancement of Cost Engineering International (AACEI).

STEVE KAROLY, Executive Vice-President
Previous Employment/Position: Acting Assistant Administrator within the TSA’s Office of Requirements and Capabilities Analysis (ORCA) Qualifications: As the Acting TSA Assistant -Administrator, Steve served as the principal advisor on matters relating to capabilities and requirements used in all modes of transportation. Steve served as TSA’s Innovation Leader where he led the Innovation Task Force (ITF) and Deputy Assistant Administrator for the Office of Security Capabilities (OSC), overseeing the implementation and development, test and

Merced Yosemite Regional Airport (MCE)

7 Confidential Pricing / Means and Methods
evaluation, acquisition, deployment, and maintenance of all TSA security technologies and systems.

Prior to joining K2, Steve planned and managed the highly successful LaGuardia International Airport, $6 billion Terminal B greenfield project for LaGuardia Gateway Partners.

Resume: Steve is a retired Captain (06) in the U.S. Navy who brings over 35 years of acquisition and systems engineering experience from both a federal and industry perspective.

KEITH JEFFRIES, Vice-President
Previous Employment/Position: Federal Security Director (FSD) for the Los Angeles International Airport (LAX)
Qualifications: As the Federal Security Director (FSD) for LAX, for almost seven years, Keith was instrumental in LAX ’s selection as a TSA Innovation Test Site. Keith also served in various positions at TSA Headquarters in Washington D.C. His last assignment at TSA HQ was the Deputy Director for Field Operations. In that role, he provided innovative leadership in the establishment and implementation of comprehensive security strategies and enterprise-wide management of 452 federalized airports, 43,000 screening officers, and a $3 billion budget.

Resume: Keith Jeffries is a security professional with over four decades of strategic, tactical, and operational experience. He is a retired Marine Officer (20 years) and has recently retired after 20 years with TSA. Keith is regularly interviewed on natio nal television news and in print for his expertise in U.S. checkpoints.

MARA WINN, Vice-President of Aviation
Previous Employment/Position: Deputy Director, Preparedness, Policy, and Risk Analysis and Director of Survey Operations (Senior Executive Service) for the Department of Energy
Qualifications: Mara Winn is a nationally recognized executive leader with more than 25 years of experience advancing aviation security, national security, energy resilience, and critical infrastructure missions. As Vice President of Aviation at K2 Construction Consultants, she leads the design, planning, and delivery of airport security and screening infrastructure supporting safe and efficient operations across the aviation sector.

Previously, Mara served in Senior Executive Service roles where she led enterprise- wide strategies for preparedness, risk management, cybersecurity, and resilience across all 16 national critical infrastructure sectors. At the Transportation Security Admin istration, she founded and led the TSA Innovation Task Force, transforming how the federal government evaluates, acquires, and deploys aviation security technologies across U.S. airports. She holds engineering degrees from Dartmouth College and Smith College, is a certified Project Management Professional (PMP), and is the named inventor on two U.S. patents for augmented reality security screening technologies.

Merced Yosemite Regional Airport (MCE)

8 Confidential Pricing / Means and Methods
CAMERON LOVELL, Director of Engineering
Previous Employment/Position: TSA Program- SESI, Site Lead Qualifications: Cameron has over fifteen (15) years of experience managing or supervising hundreds of CAT X and CAT 1 Airport Checkpoints, employee checkpoints, VIP checkpoints, and Checked Baggage systems installations, relocations and decommissions. He h as eight (8) years of experience managing deployments of checkpoint new technology including CPSS, Computed Tomography (CT) scanners and Rohde & Schwarz AITs. As K2 ’s Director of Engineering, he supports the field staff as Subject Matter Expert (SME) in bo th project management procedures, quality management and as a checkpoint expert. As a checkpoint SME, his responsibilities include design review, CAD/Revit design, engineering, and TSA policy.

Cameron has produced designs for LGA Terminal C, SRQ, and JFK Terminal 4. He has audited every design for every project K2 has performed and has provided direct consultation and compliance corrections for nearly as many. Some notable projects include LAX Terminals 1.5, 2.5, and 4, LGA Terminal B, and ATL T-South.

Resume: Cameron has a M.S. in Civil Engineering, Structural Engineering and Mechanics, a B.S. in Civil Engineering, Civil and Environmental Engineering, and graduated Magna Cum Laude from University of Massachusetts.

JIM LEE, Safety Manager, Checked Baggage SME
Previous Employment/Position: Senior Systems Engineer
Qualifications: Jim has over 29 years of experience in the design, installation, testing, and operational transition of FAA/ TSA Airport Checked Baggage Inspection Systems, CPSS and experience in rail and seaport facility security. Additionally, Jim has over 40 years of experience performing, managing, and providing oversight planning, design, development, construction and installation, integration, test and commissioning, and operational transition of complex electronic systems.

Jim is highly skilled in the execution of airport projects. For the TSA Security Equipment Deployment Office (STDO) project, he served as an Airport Site Lead, managing project design, construction, installation, acceptance testing, and deployment of EDS in -line Checked Bag Screening Systems, ensuring completion within budget, scope, and on schedule.

Resume: OSHA 10- & 30-Hour Certification; Red Cross First Aid, CPR & AED. TSA considers Jim one of the very best Checked Baggage SMEs in the country.

Merced Yosemite Regional Airport (MCE)

9 Confidential Pricing / Means and Methods
VI. APPENDICES

APPENDIX A - PREVIOUS EXPERIENCE
K2 has hundreds of projects that were awarded to us by other SI’s to perform the contract work.

However, the body of work listed below are examples of projects awarded to K2 by airlines, airport and airport authorities, city and port authorities, consortiums, general contractors, and OEMs. All projects below were planned, managed, and staffed by K2.

AIRLINES

CUSTOMER LOC TERM PROJECT

American
LAX 4 ASL Install (Lane 7 & 12)
4 Cargo Move
MIA FIS ASL Install (Lane 6 & 7)
D: FIS Decom Smiths X-Ray (Lane 7)
ORD 3 CP 7 (Lane 5 & 6)
PHX 4 CP B: CT Pilot Program
Alaska
ADQ Main CP TSE Relocation
OTZ Main CP TSE Relocation (Lane 1)
SCC Main CP TSE Relocation
YAK Main TSE Relocation
Delta
ATL North ASL Install (Lane 1-3)
Main ASL Install (Lane 1-18)
JFK 2 ASL Install (Lane 2-4)
Employee CP Install
LAX
2 ASL Install (Lane 2-4)

2.5 Pre-Installation Services
Purchase / Install Checkpoint Equipment
3 ASL Install (Lane 1-7)
Decommission of Terminal
LGA
C ASL Install (Lane 1-2)
D ASL Install (Lane 2-5)
C Consulting Services – New Terminal
C Purchase / Install Checkpoint Equipment
C Decommission Checkpoint
Hawaiian HNL 1 Commuter: TSE Relocation (Lane 1)
United IAH TC-2 Security Checkpoint Upgrade
ORD 1 CP 1 TSE Relocation

CITIES / PORT AUTHORITIES

CUSTOMER LOC TERM PROJECT
City of Brownsville BRO Main SSCP TSE Relocation
Mass. Port Authority BOS A, B, C SSCP TSE Relocation
NYNJPA EWR B Rapiscan Move (Lane 5)
SWF Main SSCP TSE Relocation
Port of Seattle SEA 1 WTMD Troubleshoot

AIRPORT & AIRPORT AUTHORITIES

CUSTOMER LOC TERM PROJECT
Greater Ashville AA AVL Main SSCP TSE Relocation (Lane 1-2) Eastern Iowa CID Main SSCP TSE Relocation (Lane 1-2)
Glacier Park Intl. GPI Main SSCP TSE Relocation
Lea County Govt. HOB Main SSCP TSE Relocation
Concord Pagett Reg. JQF Main SSCP TSE Relocation

Merced Yosemite Regional Airport (MCE)

10 Confidential Pricing / Means and Methods
Lafayette Reg. LFT Main SSCP TSE Relocation
Jackston County MFR Main SSCP TSE Relocation
Montrose Reg. MTJ Main SSCP TSE Relocation (Lane 1-2)
Omaha AA OMA Main CP A TSE Relocation
PHX Sky Harbor PHX 2 & 3 SSCP TSE Relocation
Palm Springs PSP Main SSCP TSE Relocation (Lane 1-5)
Savannah SAV Main SSCP B TSE Relocation
Salt Lake City Dept. of
Airports SLC Main (Old) Decommission Terminal
San Diego Airport SAN 1 2 Lane Equipment Relocation
Sheridan County SHR Main SSCP TSE Relocation
Sarasota Manatee SRQ Main SSCP Design Consulting
Main SSCP TSE Relocation
St. Louis STL 2 SSCP X-Ray Relocation (Lane 1-2)
Tallahassee Intl. TLH Main Terminal Rehab PH I & II
Tampa Intl. TPA E/C AIT Relocation
NW Arkansas XNA Main 3 Lane Relocation

GENERAL CONTRACTORS

CUSTOMER LOC TERM PROJECT
Clark SFO Intl. SSCP TSE Relocation
Clune ORD 1 CP 3 PH 1 Decom & ASL Lanes
D&M AVP Main SSCP TSE Relocation (Lane 1-2)
D.W. Wilson SAT A SSCP 1 TSE Relocation (Lane 6)
Dick Anderson HLN Main Terminal Expansion (Lane 1-2)
FCI GUC Main SSCP TSE Relocation

GDIT LAX TBIT
ASL Install (Lane 1-16)
Intl. Shipping (Air 3, Sea 11)
90D Pilot R&S Body Scanner
Relocation of 2 AITs
Gardner MCI Main SSCP TSE Relocation

GENERAL CONTRACTORS, CONSORTIUMS

CUSTOMER LOC TERM PROJECT
Hensel Phelps
AUS Main Troubleshoot WTMD Installs
DEN Main Pre-Design Services
Great Hall PH. 2 – TSE Relocation
EGE Main SSCP Relocation (Lane 1-4)
HNL Main ITT Mauka Extension – TSE Relocation
IAH 2 Equipment Decommission
LAX
7 SSCP Relocation: SSCP B-7
KI Glass Room Relocate
7 Alpha / Bravo ASL Lanes Installation
7 ASL Lanes Ph. 1 (7-10, 12)
ASL Install (Lane 3-7)
All Subject Matter Expertise
1 SSCP Installation (Lane 1-8)
2 ASL Installations
Terminal Decommission

2.5 Install New Terminal (2021 – 2022)

1.5 6 Lane ASL Install (2020)
Install New Terminal (2020)
3 6 Lane ASL Install (2021)
Terminal Decommission
EMPL Relocation

Merced Yosemite Regional Airport (MCE)

11 Confidential Pricing / Means and Methods
SFO 1 ASL Install
Hoffman – Skanska PDX D/E SSCP 8 Lane Relocation
New North & South 20 Lane Installation & 18 Lane Decommission Holt LGA B CT-80 Relocation
D SSCP TSE Relocation
JABCO MIA D (FIS) Decommission Smiths X-Ray (Lane 7)
LaGuardia Gateway
Partners LGA B Terminal Decommission (All)
Layton Construction PVU All Terminal Renovation Equipment Relocation Millenium Partners JFK 6 Terminal Site Integrator (2020) Meade-Hunt CHS Main X-Ray Relocation (Lane 5)
QDC LLC STS Main CP Equipment Relocation
RS&H LFT Main CP Equipment Relocation
Sauer, Inc. CSG Main SSCP TSE Relocation

OEMs

CUSTOMER LOC TERM PROJECT
Analogic
ALB Installation Support
BUF Installation Support
BWI Main Shipping / Rigging of CT
EWR 4 ConneCT Install (Lane 5)
JFK 8 CT Install & Conveyor Upgrades
LAX 4 ConneCT Install (Lane 5)
MIA FIS ConneCT Install (Lane 7)
OAK Main Shipping / Rigging of CT
PHL Main Shipping / Rigging / Install
SYR Installation Support
TPA CT Upgrades
CEIA US Misc. 2,000+ SSCP WTMD Services
L3 Communications Misc. 50+ AIT Install Assists
Leidos
BWI BAG Baggage CT Relocate and Upgrade
EWB L1 CP Defederalization
IAD BAG Baggage CT Relocate and Upgrade
IND Clearscan Install
MIA FIS Delta Test Lane Install
Rose Bowl CA 60 Lane WTMD Install
THQ HQ ASL Install Support
TPA C:CP2 Analogic Install & WTMD
TSIF CP Defederalization
MacDonald – Humfrey
ATL South CT & ASL Install & Upgrade
LGA B 14 ASL Installs
Miami PORT ASL Installs
MSP 1 S 4 ASL Lanes Installs
PHL Infield Reconfiguration (Lane 3-4)
Rohde & Schwarz
DEN 2 Decommission QPS201 AITs & Pack
EWR 8 8 AIT Installs
LAX TBIT AIT Install
LGA B 8 QPS201AIT Installs
C 7 QPS201AIT Installs
MIC Main 1 QPS201AIT Install
Smiths Detection LGA B Employee SSCP: AT2 Rigging
Vanderlande LAS 3 ASL Install (Lane 4-6)
TSIF N/A X-Ray Move

← All documents from this meeting