AMENDMENT MODIFICATION SUMMARY - (E-76)
FEDERAL AID PROGRAM CALIFORNIA DEPARTMENT OF TRANSPORTATION DLA LOCATOR: 10-MER-0-MER PROJECT LOCATION:
PREFIX: CML
PROJECT NO: 5085(059)
ALONG THE FOLLOWING CORRIDORS WITHIN THE CITY OF MERCED: R ST, M ST, G ST, OLIVE AVE AND YOSEMITE AVE.
TYPE OF WORK:
SEQ NO: 6
STATE PROJ NO: 1022000097L-N
ALT. PROJ NO:
MERCED TRAFFIC SIGNAL SYNCHRONIZATION PROJECT. TRAFFIC SIGNALS FED RR NO'S:
PREY AUTH l AGREE DATES·
PE:
AGENCY: MERCED
ROUTE:
DISASTER NO:
TIP DATA
MPO:
PUC CODES:
PROJ OVERSIGHT: ASSUMED/LOCAL ADMIN
ENV STATUS / EIS 07/12/2023
RW STATUS / DT: 1 07/15/2024
INV RTE:
BEG MP:
R/W:
CON:
SPR:
MCS:
0TH:
FSTIP YR:
MCAG
21/22 END MP: PROJECT END DATE (PED): 01/29/2028
STIP REF:
FSTIP ID
205-0000-0318
CMAQ21-04
PROG CODE
M400
2400
2400
FUNDING SUMMARY
PHASE
PE
R/W
CON
0TH
LINE NO
10 30
31 IMPV TYPE
15 24
17 PE PREV. OBLIGATION
PE THIS
PE SUBTOTAL
RW PREV. OBLIGATION
RW THIS REQUEST
RW SUBTOTAL
CON PREV. OBLIGATION
CON THIS REQUEST
CON SUBTOTAL
0TH PREV. OBLIGATION
0TH THIS REQUEST
0TH SUBTOTAL
BRIDGE NO:
FUNC SYS URBAN AREA
PROJECT COST
$325,361.00
$0.00
$325,361.00
$0.00
$0.00
$0.00
$1,122,125.00
$277,873.00
$1,399,998.00
$0.00
$0.00
$0.00
TOTAL: $1,725,359.00
STATE REMAR�S
12/06/2021 SEQ1: RFA PE (7-1 is attached)
12/14/2021 * SEQ 1: Authorizing $211,365.00 in CMAQ federal funds for PE phase.
URB/RURAL DEMO ID
FEDERAL COST AC COST
$211,365.00 $0.00
$0.00 $0.00
$211,365.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$993,417.00 $0.00
$246,000.00 $0.00
$1,239,417.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$1,450,782.00 $0.00
07/28/2023 Sequence #2 is a request to extend the project end dale (PED) from 10/01/23 to 9/30/24. The first request for an extension was declined on 6/06/23 without prejudice. The project was delayed by a slow environmental process. The FTIP ID was entered into the record as requested by FHWA in an email dated 12/30/21. This request was deferred until the local agency's unique entity identifier (UEI) was entered into FMIS. There are no other actions requested.
08/04/2023 Sequence #3 is a resubmittal of Sequence #2 that inadvertanlly did not update the project end dale to 9/30/24. There are no other changes. 06/28/2024 SEQ #4: RFA CON, EPSP authorization is in the package. DBE=21%, QAP=4/22/22. RW Cert is attached separately as ii was received last. 07/24/2024 SEQ 4: CON initial authorization. Obligating $993,417 of 2400 funds to CON. CE is not being requested. Effective this sequence, PED is set to 01/06/26. 09/08/2025 Sequence #5 is a request to extend the project end dale (PED) from 1/06/26 to 1/29/28. The project has been delayed to downsize the project scope to coincide with the obligated funding after bids were rejected twice as too costly. There are no other actions requested. 04/30/2026 SEQ6: AMOD due to Award. Agency is adding $246k in funds. MCAG letter of support is attached. 05/20/2026 Seq 6 - Add CON/CE funding of $246k. Post programming change approved by MCAG.