REGULAR MEETING OF THE MILPITAS
CITY COUNCIL
April 19, 2022 Milpitas City Council Agenda Page 1
AG E N D A
TUESDAY, APRIL 19, 2022
CITY COUNCIL CHAMBERS, 455 E CALAVERAS BLVD, MILPITAS, CA 7:00 PM (PUBLIC BUSINESS)
For assistance in the following languages, you may call:
Đối với Việt Nam, gọi 408-586-2400
Para sa Tagalog, tumawag sa 408-586-3051
Para español, llame 408-586-3072
The City Council meeting is held in the City Council Chamber at City Hall, 455 E. Calaveras Blvd., Milpitas and via teleconference/Zoom webinar.
You may watch the Council meeting without providing public comment by accessing it via links here.
Meeting shall be livestreamed - Go to:
Facebook: https://www.facebook.com/CityofMilpitas/
YouTube: https://www.ci.milpitas.ca.gov/youtube
Web Streaming: https://www.ci.milpitas.ca.gov/webstreaming
PUBLIC COMMENT INSTRUCTIONS
Oral public comments may be provided live during the City Council meeting in person or by registering for the zoom meeting in advance. To register you will need to provide an email address (not disclosed) and a name. To minimize technical difficulties, please make sure that you have the latest version of the Zoom Application. Below is the link to register for this meeting only:
https://ci-milpitas-ca-gov.zoom.us/webinar/register/WN_KvXKMOX1T3Sfp0jIqc97pw
After you register a link will be sent to you to join the City Council meeting in order to give your comments.
All registered meeting attendees who wish to speak must click on the “raise hand” icon when the Mayor calls for public comments. If participating by calling in on your phone, dial *9 to use the “raise hand” feature, and when you are called upon, hit *6 to unmute your phone. Your phone number will be displayed in the live meeting. The Mayor will call the speakers to begin.
All comments provided shall be limited to three minutes or less as determined by the Mayor. All members of the public will be limited to one comment per agenda item, and one comment for non-agenda items.
MILPITAS CITY COUNCIL CODE OF CONDUCT
Be respectful and courteous (words, tone, and body language). Model civility.
Avoid surprises.
Praise publicly and criticize privately.
Focus on the issue, not the person.
Refrain from using electronic devices while on the Council dais. Disclose conflicts of interest and affiliations related to agenda items. Separate governing from campaigning.
The Council speaks with one voice after making policy on issues. Respect the line between policy and administration.
Council will hold one another accountable to comply with this Code of Conduct.
1 April 19, 2022 Milpitas City Council Agenda Page 2
CALL MEETING TO ORDER by Mayor and ROLL CALL by City Clerk (7:00 PM)
PLEDGE OF ALLEGIANCE
INVOCATION (Councilmember Chua)
PRESENTATIONS (7:05 PM)
Arbor Day (Proclamation)
National Autism Acceptance Month (Proclamation)
Parkinson’s Awareness Month (Proclamation)
PUBLIC FORUM (7:10 PM)
Those in the audience and via Zoom are invited to address City Council on any subject not on tonight’s agenda. In-person speakers wishing to address the Council are requested, but not required to complete a Speaker Card and submit it to the Mayor. In-person speakers will then be asked to come up to the podium and state their name for the record. Those interested in speaking via Zoom may do so by following the instructions on page one (1) of the agenda. Comments may be limited to three (3) minutes or less at the Mayor’s discretion. As an item not listed on the agenda, no response is required from City staff or the Council and no action can be taken. The City Council may instruct the City Manager to place the item on a future meeting agenda.
NOTE: If a member of the public wishes to share any presentation materials for Council consideration, they must be submitted to the Clerk’s Office by email to [email protected] by 12:00 p.m. on the day of the meeting. No presentations will be accepted in person in the Council Chambers.
ANNOUNCEMENTS AND FUTURE AGENDA ITEMS (7:15 PM)
Members of the City Council or City Manager may make brief announcements at this time. Members of the City Council may also suggest future agenda items at this time. For future agenda items, the City Council shall not debate the topic or engage in discussion but shall simply state a “yes” or “no” as to whether to direct the City Manager to place the item on a future meeting agenda. If a majority of the City Council agrees to place an item on a future meeting agenda, the City Manager shall place the item on a future agenda for City Council discussion.
ANNOUNCEMENT OF CONFLICT OF INTEREST AND CAMPAIGN CONTRIBUTIONS
READING OF THE CITY COUNCIL CODE OF CONDUCT
APPROVAL OF AGENDA
CONSENT CALENDAR (7:25 PM)
Consent calendar items are considered to be routine and will be considered for adoption by one motion. There will be no separate discussion of these items unless a City Councilmember, member of the audience or staff requests the Council to remove an item from (or be added to) the consent calendar. Any person desiring to speak on any item on the consent calendar should ask to have that item removed from the consent calendar.
C1. Receive the City Council Calendar of Meetings for April and May 2022 (Staff Contact: Wendy Wood, City Clerk, 408-586-3001)
Recommendation: Receive the City Council Calendar of Meetings for April and May 2022.
C2. Approve the City Council Regular Meeting Minutes of April 5, 2022 (Staff Contact: Wendy Wood, City Clerk, 408-586-3001)
Recommendation: Approved the City Council Regular Meeting minutes of April 5, 2022.
C3. Receive the Preview List of Anticipated Items for the Next Regular City Council Meeting (Staff Contact: Wendy Wood, City Clerk, 408-586-3001)
Recommendation: Receive the list of anticipated agenda items for the next regular City Council meeting.
2 April 19, 2022 Milpitas City Council Agenda Page 3
C4. Receive and Review the List of Agenda Items Requested by City Councilmembers (Contact:
Mayor and City Councilmembers, 408-586-3000)
Recommendation: Review the list of items that have been requested by City Councilmembers and provide direction to staff as necessary. No substantive discussion about any specific item shall occur and the City Council shall hold all debate about the item until it is scheduled as a full agenda item.
C5. Approve and Authorize the City Manager to Execute a Stormwater Management Facilities Operation & Maintenance Agreement for BP Products North America Inc. at 1575 Landess Avenue (Staff Contact: Steve Erickson, Engineering Director/City Engineer, 408-586-3301) Recommendation: Approve and authorize the City Manager to execute a Stormwater Management Facilities Operation and Maintenance Agreement for BP Products North America Inc. for the Gas Station and Convenience Store Project at 1575 Landess Avenue.
C6. Approve and Authorize the City Manager to Execute a Stormwater Management Facilities Operation & Maintenance Agreement for Robinson Oil Corporation at 1787 South Main Street (Staff Contact: Steve Erickson, Engineering Director/City Engineer, 408-586-3301) Recommendation: Approve and authorize the City Manager to execute a Stormwater Management Facilities Operation and Maintenance Agreement for Robinson Oil Corporation for the Gas Station and Convenience Store Project at 1787 South Main Street.
C7. Approve Updates to the Commission Bylaws, the Bylaw Addendum for the Arts Commission, the Bylaw Addendum for the Parks, Recreation and Cultural Resources Commission, and associated Commissioner Handbook updates (Staff Contact: Renee Lorentzen, Recreation and Community Services Director, 408-586-3409)
Recommendation: Approve updates to the Commission Bylaws, the Bylaw Addendum for the Arts Commission, the Bylaw Addendum for the Parks, Recreation and Cultural Resources Commission, and associated Commissioner Handbook updates.
C8. Approve the Purchase of a Police Vehicle, Find the Procurement to be in the Best Interest of the City, and Authorize the City Manager to Execute Any Documents Necessary to Effectuate the Purchase (Staff Contact: Jared Hernandez, Chief of Police, 408-586-2406) Recommendation: Approve the purchase of a Police vehicle, find the procurement to be in the best interest of the City, and authorize the City Manager to execute any documents necessary to effectuate the Purchase.
C9. Approve an Amendment of a Software License and Services Agreement with Mark43 by Adding the Evidence Data Migration and Morpho Mugshot Interface, Increasing the Not-to-Exceed Amount from $1,049,956.00 to $1,085,456.00 (Staff Contact: Steven Fox, Police Captain, 408-586- 2525)
Recommendation: Approve an amendment of a Software License and Services Agreement with Mark43 by adding the Evidence Data Migration and Morpho Mugshot Interface, increasing the not-to- exceed amount from $1,049,956.00 to $1,085,456.00.
C10. Receive the 2021 General Plan Annual Progress Report and Authorize Submittal of the Report to the Governor’s Office of Planning and Research (OPR) (Staff Contact: Jay Lee, Principal Planner, 408-586-3077)
3 April 19, 2022 Milpitas City Council Agenda Page 4
Recommendation: Receive the 2021 General Plan Annual Progress Report and authorize the submittal of the report to the Governor’s Office of Planning and Research (OPR).
C11. Receive an Update on the Emergency Replacement of Two (2) Boilers and Install of a Temporary Heating System for the Public Works, Information Technology, and Police Department Building and Determine that the Condition Continues to Constitute an Emergency (Staff Contact: Tony Ndah, Public Works Director, 408-586-2602)
Recommendation: (1) Receive an update on the emergency replacement of two (2) boilers and the installation of a temporary heating system for the Public Works, Police, and Information Technology Department buildings; and (2) Determine by a four-fifths vote that the condition continues to constitute an emergency.
C12. Receive an Update on the Repair of Pump No. 3 at the Main Lift Sewer Pump Station and Authorize Staff to Pay Final Invoices to Koffler Electric Totaling $90,095.32 (Staff Contact: Tony Ndah, Public Works Director, 408-586-2602)
Recommendation: Receive an update on the emergency repair of Pump No. 3 at the Main Lift Sewer Pump Station.
C13. Agreement with Best, Best & Krieger, LLP for Specialized/Supplemental Legal Services (Staff Contact: Ashwini Kantak, Assistant City Manager, 408-586-3053) Recommendation: Approve and authorize the City Manager to execute an agreement for specialized/supplemental legal services with Best Best & Krieger LLP.
C14. Adopt a Resolution Supporting the Submission of Projects for 2023 Community Project Funding (Staff Contact: Walter C. Rossmann, Deputy City Manager, 408-586-3012) Recommendation: Adopt a resolution supporting the submission of projects for 2023 Community Project Funding.
PUBLIC HEARINGS (7:30 PM)
Members of the public may be allotted up to three (3) minutes or less at the Mayor’s discretion, to comment on any public hearing item. Applicants/Appellants and their representatives may be allotted up to a total of ten (10) minutes for opening statements and up to a total of five (5) minutes maximum for closing statements. Items requested/recommended for continuance are subject to Council’s consent at the meeting.
15. Introduce an Ordinance Adopting a Controlled Equipment Use Policy per California Assembly Bill 481 (Staff Contact: John Torrez, Assistant Chief of Police, 408-586-2408) Recommendation: Introduce an ordinance adopting a Controlled Equipment Use Policy per California Assembly Bill 481.
16. Conduct a Public Hearing and Adopt a Resolution Approving Issuance of the California Municipal Finance Authority Multifamily Housing Revenue Bonds in an Aggregate Principal Amount Not to Exceed $47,000,000.00 for the Benefit of Milpitas Pacific Associates to Provide for the Financing of an Affordable Housing Project at 308 Sango Court (Staff Contact: Sharon Goei, Building Safety and Housing Director, 408-586-3260) Recommendation: (1) Open the public hearing under the requirements of the Tax and Equity Fiscal Responsibility Act (TEFRA) and the Internal Revenue Code of 1986, as amended (the “Code”); (2) Move to close the public hearing following any comments; and (3) Adopt a resolution approving the issuance of the Multifamily Housing Revenue Bonds in an aggregate principal amount not to exceed $47,000,000.00 by the California Municipal Finance Authority (CMFA) for the benefit of Milpitas Pacific 4 April 19, 2022 Milpitas City Council Agenda Page 5
Associates to provide for the financing of the 308 Sango Court project. Such adoption is solely for the purposes of satisfying the requirements of TEFRA, the Code, and the California Government Code Section 6500 regarding Joint Exercise of Powers.
17. Adopt a Resolution Approving the Fiscal Year 2022-23 Master Fee Schedule (Staff Contact:
Lauren Lai, Finance Director, 408-586-3111)
Recommendation: Adopt a resolution approving the Fiscal Year 2022-23 Master Fee Schedule.
COMMUNITY DEVELOPMENT (8:30 PM)
18. Homelessness Task Force Options (Staff Contact: Ashwini Kantak, Assistant City Manager, 408- 586-3053 and Sharon Goei, Building Safety and Housing Director, 408-586-3260) Recommendation: Receive staff report related to the Homelessness Task Force recommendations and provide direction to staff on next steps.
19. Receive Report on Recommended Changes to the Municipal Code to Remove and Prohibit Property in Public and Provide Direction to Staff (Staff Contact: Christopher J. Diaz, City Attorney, 408-586-3040)
Recommendation: Receive report on recommended changes to the Municipal Code to remove and prohibit property in public and provide direction to staff.
COMMUNITY SERVICES AND SUSTAINABLE INFRASTRUCTURE (9:15 PM)
20. Review the Proposed Streets, Parks and Facilities Naming Policy and Provide Feedback to Staff (Staff Contact: Renee Lorentzen, Recreation and Community Services Director, 408-586-3409) Recommendation: (1) Review the Proposed Streets, Parks and Facilities Naming Policy and provide feedback to staff; (2) Review City Naming Lists and provide feedback to staff; and (3) Authorize staff to begin process for naming McCandless Park.
LEADERSHIP AND SUPPORT SERVICES (9:45 PM)
21. Approve Employment Agreement with, and Appoint Michael Mutalipassi to Serve as City Attorney (Staff Contact: Jeannine Seher, Human Resources Director, 408-586-3086) Recommendation: Approve Employment Agreement with Michael Mutalipassi and appoint him to serve as City Attorney for the City of Milpitas.
REPORTS OF MAYOR & COUNCILMEMBERS (10:45 PM) - from assigned Commissions, Committees and Agencies
22. Per Mayor Tran, Discuss a California Statewide Communities Development Authority (CSCDA) Program for the Eleanor Project to Provide Middle-Income Workforce Housing (Contact: Mayor Tran, 408- 586-3029) - See Attached Letter and Memo
ADJOURNMENT (11:00 PM)
KNOW YOUR RIGHTS UNDER THE OPEN GOVERNMENT ORDINANCE
Government’s duty is to serve the public, reaching its decisions in full view of the public. Commissions and other City agencies exist to conduct the people’s business. This ordinance assures that del iberations are 5 April 19, 2022 Milpitas City Council Agenda Page 6
conducted before the people and City operations are open to the people’s review. For more information on your rights under the Open Government Ordinance or to report a violation, contact the City Attorney’s office at Milpitas City Hall, 455 E. Calaveras Blvd., Milpitas, CA 95035 e-mail:[email protected] / Phone: 408-586-3040
The Open Government Ordinance is codified in the Milpitas Municipal Code as Title I Chapter 310 and is available online at the City’s website www.ci.milpitas.ca.gov by selecting the Milpitas Municipal Code link.
Materials related to an item on this agenda submitted to the City Council after initial distribution of the agenda packet are available for public inspection at the City Clerk’s office at Milpitas City Hall, 3rd floor 455 E. Calaveras Blvd., Milpitas and on City website. City Council agendas and related materials can be viewed online: www.ci.milpitas.ca.gov/government/council/agenda_minutes.asp (select meeting date)
APPLY TO SERVE ON A CITY COMMISSION
Commission application forms are available online at www.ci.milpitas.ca.gov or at Milpitas City Hall.
Contact the City Clerk’s Office at 408-586-3001 for more information.
If you need assistance, per the Americans with Disabilities Act, for any City of Milpitas public meeting, please call the City Clerk at 408-586-3001 or send an e-mail to [email protected] prior to the meeting. You may request a larger font agenda.
6 Updated 4/14/22
Milpitas City Council Calendar
April 2022
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 10:00 AM-Wastewater Facility
Site Visit (CM)
2 3 4
7:00 PM-Parks, Recreation &
Cultural Resources Commission
(CM)
5 5:30 PM-Closed Session
7:00 PM-City Council
6 2:00 PM-Santa Clara VTA
Monthly Briefing - Northeast
Group (CM)
5:30 PM-Veterans Commission
(RT)
7:00 PM-Community Advisory
Commission (EC)
7 4:30 PM-Milpitas Chamber of
Commerce Board (EC)
5:30 PM-Santa Clara VTA Board
of Directors (CM)
6:00 PM-Community Outreach:
Budget Meeting
8 3:00 PM-City Council
Transportation Subcommittee
(RT/CM)
9 10 11
4:30 PM-Economic Development
and Trade Commission (KD)
12 4:00 PM-Milpitas HOPE Suicide
Prevention Task Force
4:30 PM-Main Street
Subcommittee (CM/EC)
13 12:00 PM-Santa Clara Valley
Water Commission (CM)
7:00 PM-Silicon Valley Clean
Energy Board of Directors (EC)
7:00 PM-Planning Commission
14 5:30 PM-Milpitas Chamber of
Commerce Board Meeting (EC)
6:00 PM-Cities Assoc Legislative
Action Committee (CM)
6:40 PM-Cities Assoc City
Selection Committee (CM)
7:00 PM-Youth Advisory
Commission (EC)
7:00 PM-Cities Assoc of SCC
Board of Directors (CM)
15 *4:30 PM-City Council Finance
Subcommittee (RT/CM)
16 17 18
7:00 PM-Science, Technology,
and Innovation Commission (RT)
19 5:00 PM-Special City Council
Meeting
7:00 PM-City Council
20 6:00 PM-Energy and
Environmental Sustainability
Commission (EC)
21 10:00 AM-Santa Clara VTA
Congestion Mgmt Prog Planning
Comm-CMPP (CM)
12:00 PM-SCC Joint Powers
Authority Board of Directors (EC)
6:30 PM-BAWSCA Board of
Directors Mtg (CM)
22 9:00 AM-Special VTA Board of
Directors Workshop (CM)
4:00 PM-City/School
Collaborative Subcommittee –
City hosting (RT/CM)
5:00 PM-Spelling Bee Event @
Teen Center
23 10:00 AM-
Solar/Micro
Grid &
Earth Day
City Event
(Comm.
Center
Parking lot)
24 25 26
1:30 PM-Senior Advisory
Commission (EC)
27 5:30 PM-Cities Assoc. of SCC -
Recycling and Waste Reduction
Commission (AP)
7:00 PM-Planning Commission
28 29 30
*Finance Subcommittee will only meet as needed
May 2022
S M T W T F S
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
March 2022
S M T W T F S
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
7 Item # C1.
Updated 4/15/22
MILPITAS CITY COUNCIL CALENDAR
May 2022
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 9:00 AM-Asian
Pacific American
Month Flag
Raising Event
(Cesar Chavez
Plaza)
2 7:00 PM-Parks, Recreation &
Cultural Resources Commission
(CM)
3 ?:00 PM-Closed Session
7:00 PM-City Council
4 2:00 PM-Santa Clara VTA
Monthly Briefing - Northeast
Group (CM)
7:00 PM-Community Advisory
Commission (EC)
5 10:30 AM-South Bay Odor Stakeholders
Group Quarterly Meeting (RT)
5:30 PM-Santa Clara VTA Board of
Directors (CM)
5:30 PM-Milpitas Chamber of Commerce
Board (EC)
6 7
10:00 AM-
Senior
Center
Open
House
8 9
4:30 PM-Economic
Development and Trade
Commission (KD)
10 4:00 PM-Milpitas HOPE
Suicide Prevention Task
Force
5:30 PM-Special Council
Meeting: FY2022-23 Budget
Study Session
11 7:00 PM-Planning Commission
7:00 PM-Silicon Valley Clean
Energy Board of Directors (EC)
12 7:00 AM-Bike to Wherever Day (various
locations)
4:00 PM-Santa Clara VTA Policy Advisory
Committee (AP)
4:00 PM-Treatment Plant Advisory
Committee (CM)
7:00 PM-Cities Assoc of SCC (CM)
7:00 PM-Youth Advisory Commission
(EC)
13 3:00 PM-City Council
Transportation
Subcommittee (RT/CM)
*4:30 PM-City Council
Finance Subcommittee
(RT/CM)
7:45 PM-Classic Movies
Under the Stars (Civic
Center Plaza)
14 15
9:00 AM-Public
Safety Day Flag
Raising Event
(Veterans Plaza)
16 7:00 PM-Science, Technology,
and Innovation Commission
(RT)
7:00 PM-Library and Education
Commission (EC) (Milpitas
Public Library)
17 ?:00 PM-Closed Session
7:00 PM-City Council
18 6:00 PM-Energy and
Environmental Sustainability
Commission (EC)
19 10:00 AM-VTA Congestion Mgmt
Program Planning Committee (CM)
3:00 PM-VTA Safety, Security, Transp.
Planning & Operations Committee (CM)
4:00 PM-Treatment Plant Advisory
Committee (CM)
6:30 PM-Bay Area Water Supply Conserv
Agency (CM)
7:00 PM-Public Safety and Emergency
Preparedness Commission (KD)
20 21
22 23
7:00 PM-Arts Commission (RT)
24 25
1:30 PM-SCC Emergency
Operational Area Council Meeting
(CM)
2:00 PM-City Council Housing
Subcommittee (AP/EC)
7:00 PM-Planning Commission
26 4:00 PM-Silicon Valley Regional
Interoperability Authority (SVRIA) (KD)
27 4:00 PM-City/School
Collaborative Subcom –
school hosting (RT/CM)
28 29 30
9:00 AM-Memorial Day
Ceremony (Veterans Plaza)
City Hall Closed
31 *Finance Subcommittee will only meet as needed
April 2022
S M T W T F S
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
June 2022
S M T W T F S
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
8 Item # C1.
REGULAR MEETING OF THE MILPITAS
CITY COUNCIL
April 05, 2022 Milpitas City Council Agenda Page 1
AG E N D A
TUESDAY, APRIL 5, 2022
CITY COUNCIL CHAMBERS, 455 E CALAVERAS BLVD, MILPITAS, CA 5:30 PM (CLOSED SESSION)
7:00 PM (PUBLIC BUSINESS)
The City Council of the City of Milpitas convened on the regular City Council meeting day of April 5, 2022, in the City Council Chamber at City Hall, 455 E. Calaveras Blvd., Milpitas, and via teleconference/Zoom webinar.
CALL MEETING TO ORDER by Mayor and ROLL CALL by City Clerk Mayor Tran called the regular City Council meeting to order at 5:30 PM. Roll Call was taken by City Clerk Wood.
PRESENT: Mayor Tran, Vice Mayor Montano, Councilmembers Chua, Dominguez, and Phan ABSENT: None
ADJOURN TO CLOSED SESSION
(a) CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION Pursuant to Government Code Section 54956.9(d)(2)
City as Defendant - See document attached in agenda packet
(b) CONFERENCE WITH LABOR NEGOTIATORS
Pursuant to Government Code Section 54957.6
Agency designated representative: Jeannine Seher, Human Resources Director Bargaining unit: IAFF
(c) PUBLIC EMPLOYEE APPOINTMENT/HIRING
Pursuant to California Government Code Section 54957
Position: City Attorney
(d) CONFERENCE WITH LABOR NEGOTIATORS
Pursuant to Government Code Section 54957.6
Agency Designated Representative: Jeannine Seher, Human Resources Director Unrepresented Employee: City Attorney
(e) PUBLIC EMPLOYEE PERFORMANCE EVALUATION
Pursuant to California Government Code Section 54957
Position: City Manager
CLOSED SESSION ANNOUNCEMENT:
Report on action taken in Closed Session, if required per Government Code Section 54957.1, including the vote or abstention of each member present.
City Attorney Diaz stated there was no reportable action on items a, d, and e. Council had no reportable action on items b and c.
9 Item # C2.
April 05, 2022 Milpitas City Council Agenda Page 2
PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Mayor Tran.
INVOCATION
Councilmember Chua led the invocation.
PRESENTATIONS
Mayor Tran proclaimed the month of April as National Public Safety Telecommunications Week and presented the proclamation to Communications Dispatcher Rachelle Boyd and Communications Dispatch Supervisor Lena Sillas. Mayor Tran also proclaimed the month of April as Vietnamese-American Heritage Month and Fair Housing Month.
Fair Housing Director for Project Sentinel Molly Current provided information on fair housing.
PUBLIC FORUM
Those in the audience and via Zoom are invited to address City Council on any subject not on tonight’s agenda. In-person speakers wishing to address the Council are requested, but not required to complete a Speaker Card and submit it to the Mayor. In-person speakers will then be asked to come up to the podium and state their name for the record. Those interested in speaking via Zoom may do so by following the instructions on page one (1) of the agenda. Comments may be limited to three (3) minutes or less at the Mayor’s discretion. As an item not listed on the agenda, no response is required from City staff or the Council and no action can be taken. The City Council may instruct the City Manager to place the item on a future meeting agenda.
The following people spoke under Public Forum:
1. Rose Riggs
2. Warren Wettenstein
3. Voltaire Montemayor
ANNOUNCEMENTS AND FUTURE AGENDA ITEMS
Members of the City Council or City Manager may make brief announcements at this time. Members of the City Council may also suggest future agenda items at this time. For future agenda items, the City Council shall not debate the topic or engage in discussion but shall simply state a “yes” or “no” as to whether to direct the City Manager to place the item on a future meeting agenda. If a majority of the City Council agrees to place an item on a future meeting agenda, the City Manager shall place the item on a future agenda for City Council discussion.
City Manager McHarris announced the City received 344 eligible applications for the ARPA Small Business Assistant Grant Program and 81 businesses qualified for the direct $5,000 grant assistance based on the Council directive to prioritize key industries. The remaining 263 businesses will enter a lottery scheduled for Friday, April 8 at 2:00 p.m.
Mayor Tran attended the Milpitas High School Trojan Olympics and the Milpitas Chamber of Commerce Crab Feed. He made the following request:
1. To agendize a discussion for the next meeting a CSCDA for the Eleanor building.
Vice Mayor Montano attended the Milpitas High School Trojan Olympics and the Milpitas Chamber of Commerce Crab Feed. She made the following requests:
1. Add crossing guards at McCandless and Montague Expressway.
2. Add Mexican Independence Day to the list of events.
10 Item # C2.
April 05, 2022 Milpitas City Council Agenda Page 3
Mayor Tran made an amendment to the crossing guards’ item and ask that staff bring back a comprehensive report on the crossing guards’ program.
Vice Mayor Montano accepted the amendment.
Councilmember Chua made the following requests:
1. Support SB 919 related to catalytic converters.
2. Asked Supervisor Otto Lee to look at funding a pilot project for DIY (do it yourself) catalytic converter etching kits to distribute to residents.
3. Explore an ordinance or policy for commercial retail parking areas in Milpitas to reduce thefts and increase security.
Councilmember Phan attended the annual policymaker conference in Yosemite, commented on the encampment resolution funding program, and would like housing staff to look at the program.
Councilmember Dominguez commented on the divider and wall north of Abel Street and made the following request:
1. Staff look at the center divider to help improve safety, and report back by the budget meeting to see if there is an opportunity to fund traffic mitigation.
2. Staff prepare a report on ghost guns in the City of Milpitas and look at any State bills that the Council should be aware of to write a letter of support.
3. Bring back a conversation in the budget meeting to fund “walking beats” in commercial and high crime areas.
4. A pilot program to help fund cameras for businesses on Main Street to monitor activity and would like this to come back to Council for direction and funding.
Mayor Tran made an amendment to the ghost guns proposal to tie it into the gun’s buyback program as a further incentive to the program. He also asked that Councilmember Dominguez work with the City Manager to find funding sources for the “walking beats.”
ANNOUNCEMENT OF CONFLICT OF INTEREST AND CAMPAIGN CONTRIBUTIONS City Attorney Diaz asked the Mayor and City Councilmembers if they had any personal conflicts of interest. By roll call, there were no conflicts of interest. City Attorney Diaz asked the Mayor and City Councilmembers if they had any reportable campaign contributions. By roll call, there were no reportable campaign contributions.
READING OF THE CITY COUNCIL CODE OF CONDUCT
City Attorney Diaz read aloud the City Council Code of Conduct.
APPROVAL OF AGENDA
Motion: to approve the April 5, 2022, regular meeting agenda.
Motion/Second: Mayor Tran / Councilmember Dominguez
Motion carried by the following roll call vote:
AYES: Councilmembers Chua, Dominguez, Phan, Vice Mayor Montano, Mayor Tran NOES: None
11 Item # C2.
April 05, 2022 Milpitas City Council Agenda Page 4
CONSENT CALENDAR
Consent calendar items are considered to be routine and will be considered for adoption by one motion. There will be no separate discussion of these items unless a City Councilmember, member of the audience or staff requests the Council to remove an item from (or be added to) the consent calendar. Any person desiring to speak on any item on the consent calendar should ask to have that item removed from the consent calendar.
Motion: to approve the Consent Calendar.
Motion/Second: Mayor Tran / Vice Mayor Montano
Motion carried by the following roll call vote:
AYES: Councilmembers Chua, Dominguez, Phan, Vice Mayor Montano, Mayor Tran NOES: None
Vice Mayor Montano asked to postpone item 16 to the next meeting.
Motion: to postpone item 16 to the next meeting.
Motion/Second: Vice Mayor Montano / Mayor Tran
Motion carried by the following roll call vote:
AYES: Councilmembers Chua, Dominguez, Phan, Vice Mayor Montano, Mayor Tran NOES: None
Vice Mayor Montano asked to move item 20 after item 14.
Motion: to move item 20 after item 14.
Motion/Second: Vice Mayor Montano / Mayor Tran
Motion carried by the following roll call vote:
AYES: Councilmembers Chua, Dominguez, Phan, Vice Mayor Montano, Mayor Tran NOES: None
C1. Receive the City Council Calendar of Meetings for April 2022 (Staff Contact: Wendy Wood, City Clerk, 408-586-3001)
Received the City Council Calendar of Meetings for April 2022.
C2. Approve the City Council Regular Meeting Minutes of March 15, 2022 (Staff Contact: Wendy Wood, City Clerk, 408-586-3001)
Approved the City Council Regular Meeting minutes of March 15, 2022.
C3. Receive the Preview List of Anticipated Items for the Next Regular City Council Meeting (Staff Contact: Wendy Wood, City Clerk, 408-586-3001)
Received the list of anticipated agenda items for the next regular City Council meeting. 12 Item # C2.
April 05, 2022 Milpitas City Council Agenda Page 5
C4. Receive and Review the List of Agenda Items Requested by City Councilmembers (Contact:
Mayor and City Councilmembers, 408-586-3000)
Reviewed the list of items that have been requested by City Councilmembers.
C5. Adopt a Resolution Granting an Easement to Pacific Gas and Electric Company and Authorizing the City Manager to Execute the Grant of Easement, and Any and All Necessary Documents, in a Form Approved by the City Attorney, For the Access, Construction, and Maintenance of PG&E Owned Electric Facilities Infrastructure to Serve the Fire Station No. 2 Property (Staff Contact:
Steve Erickson, Engineering Director/City Engineer, 408-586-3301) Adopted Resolution No. 9136 granting an easement to Pacific Gas and Electric Company and authorizing the City Manager to execute the Grant of Easement, and any and all necessary property related documents, in a form approved by the City Attorney, for the access, construction, and maintenance of PG&E owned electric facilities infrastructure to serve the Fire Station No. 2 property.
C6. Receive an Update on the Repair of Pump No. 3 at the Main Lift Sewer Pump Station and Determine that the Condition Continues to Constitute an Emergency (Staff Contact: Tony Ndah, Public Works Director, 408-586-2602)
Received an update on the emergency repair of Pump No. 3 at the Main Lift Sewer Pump Station; and determined by a unanimous vote that the condition continues to constitute an emergency.
C7. Approve and Authorize the City Manager to Execute a Funding Agreement with the Santa Clara Valley Transportation Authority (VTA) for the 2016 Measure B Innovative Transit Service Models Program; Approve New Fiscal Year 2021-22 Capital Improvement Program Project No. 3493 Milpitas OnDemand; Approve a Budget Appropriation of $1,355,916.00 including Measure B Innovative Transit Service Models Program Funds ($1,084,732.00), developer contributions ($200,000.00), and General Government CIP Fund ($71,184.00) into Project No. 3493; and Adopt a Resolution to Approve and Authorize the City Manager to Execute a Subscription and Services Agreement with RideCo in a Not-to-Exceed Amount of $1,355,916.00 for Consultant Services Related to Milpitas OnDemand and Making Sole Source Findings and Findings that the Procurement is in the Best Interest of the City (Staff Contact: Ned Thomas, Planning Director, 408-586-3273 and Jay Lee, Principal Planner, 408-586-3077) Approved and authorized the City Manager to execute a funding agreement with the Santa Clara Valley Transportation Authority (VTA) for the 2016 Measure B Innovative Transit Service Models Program; approved the new Fiscal Year 2021-22 Capital Improvement Program Project No. 3493 Milpitas OnDemand; approve a budget appropriation of $1,355,916.00 including Measure B Innovative Transit Service Models Program Funds ($1,084,732.00), developer contributions ($200,000.00), and General Government CIP Fund ($71,184.00) into Project No. 3493; and adopted Resolution No. 9137 approving and authorizing the City Manager to execute a subscription and services agreement with RideCo in a not-to-exceed amount of $1,355,916.00 for consultant services related to Milpitas OnDemand and making sole source findings and findings that the procurement is in the best interest of the City.
C8. Adopt a Resolution Releasing Unclaimed Funds with a Value less than $15 amounting to $171.82 (Staff Contact: Lauren Lai, Finance Director/Risk Manager, 408-586-3111) Adopted Resolution No. 9138 releasing Unclaimed Funds with a value less than $15 amounting to $171.82.
C9. Consider the Request Received by the City Clerk and Approve Fee Waiver of $1,500.00 for the Milpitas Community Educational Endowment & Samuel Ayer Alumni Association for an Event on September 30, 2022, and Approve a Fee Waiver of $420.00 for the Christian Worship Center 13 Item # C2.
April 05, 2022 Milpitas City Council Agenda Page 6
for a Community Easter Egg Hunt on April 16, 2022. (Staff Contact: Wendy Wood, City Clerk, 408-586-3001)
Approved a Fee Waiver of $1,500.00 for the Milpitas Community Educational Endowment & Samuel Ayer Alumni Association for an event on September 30, 2022, and approved a Fee Waiver of $420.00 for the Christian Worship Center Community Easter Egg Hunt on April 16, 2022.
C10. Accept Committee Member and Commissioner Resignations (Staff Contact: Wendy Wood, City Clerk, 408-586-3001)
Accepted the resignation of Committee Member Dhanwant Dhaliwal from the Measure F Oversight Committee, accepted the resignation of Sukhpreet Badesha from the Arts Commission, and directed the City Clerk to post the notices of the unscheduled vacancies.
C11. Adopt a Resolution Approving the Application for $224,543 Per Capita Grant Funds from the State Department of Parks and Recreation and Designating the City Manager as the Authorized Signer on the Grant Agreement with the State of California (Staff Contact: Renee Lorentzen, Recreation and Community Services Director, 408-586-3409) Adopted Resolution No. 9139 approving the submittal of an application for Per Capita Grant Funds from the State Department of Parks and Recreation and Designating the City Manager as the authorized signer on the grant agreement with the State of California.
C12. Accept the Report for Key 2021 Approved State Laws Impacting Municipal Operations (Staff Contact: Walter C. Rossmann, Deputy City Manager, 408-586- 3012) Accepted the report for Key 2021 approved State Laws impacting municipal operations.
C13. Consider the Recommendation from Mayor Tran for the Appointment to a City Commission (Contact: Mayor Tran, 408- 586-3029)
Received Mayor Tran’s recommendation and approve the appointment to the Energy and Environmental Sustainability Commission for a non-voting student member.
PUBLIC HEARINGS
Members of the public may be allotted up to three (3) minutes or less at the Mayor’s discretion, to comment on any public hearing item. Applicants/Appellants and their representatives may be allotted up to a total of ten (10) minutes for opening statements and up to a total of five (5) minutes maximum for closing statements. Items requested/recommended for continuance are subject to Council’s consent at the meeting.
14. Conduct a Public Hearing to Discuss the FY2022-25 Consolidated Plan Goals and Funding Allocations for FY2022-23 Community Development Block Grant and Corresponding Annual Action Plan (Staff Contact: Sharon Goei, Building Safety and Housing Director, 408-586-3260) Building Safety and Housing Director Goei introduced the item and Housing and Neighborhood Services Administrator Musallam presented the staff report.
Mayor Tran opened the public hearing.
The following people spoke:
1. Voltaire Montemayor
2. Georgia Bacil
3. Teresa Johnson
4. Alaina Purcell Schroeder
5. Nicole Steward
6. Allysson McDonald
14 Item # C2.
April 05, 2022 Milpitas City Council Agenda Page 7
7. Marina Sanchez
8. Sheri Burns
9. Linda Phillips
10. Heather Griffin
11. Jordan Dancer
12. Renee Lorentzen
Mayor Tran closed the public hearing.
During staff presentation and Council discussion, it was noted that the amount of funding applicants requested is significantly more than the amount of funding anticipated to be available. Thus, a plan that proportionally allocates funding will need to be developed. Also, there was a discussion on evaluating which organizations were going to receive ARPA funding and that staff would bring back this information as part of the final proposed plan and recommendation for the second public hearing.
After discussion, motion: to move forward with the FY2022-25 Consolidated Plan Goals and funding allocations for FY2022-23 Community Development Block Grant with full funding to the established non-profits.
Councilmember Chua seconded the motion, commented on the Filipino Chamber of Commerce partnering with the Milpitas Chamber of Commerce, and made a friendly amendment to have staff find a way to subgroup the requests.
Mayor Tran accepted the friendly amendment.
Motion/Second: Mayor Tran / Councilmember Chua
Councilmember Dominguez made a friendly amendment to request that any money left over from overlapping service be used to provide funding for the Hope for the Unhoused.
Mayor Tran declined the friendly amendment.
Motion carried by the following roll call vote:
AYES: Councilmembers Chua, Phan, Vice Mayor Montano, Mayor Tran NOES: Dominguez
Building Safety and Housing Director Goei clarified that the motion would include the consolidated plan goals.
Mayor Tran confirmed.
After Building Safety and Housing Director Goei’s clarification Councilmember Dominguez requested to change her vote.
Motion: to reconsider the item.
Motion/Second: Councilmember Dominguez / Mayor Tran
Motion carried by the following roll call vote:
AYES: Councilmembers Chua, Dominguez, Phan, Vice Mayor Montano, Mayor Tran NOES: None
15 Item # C2.
April 05, 2022 Milpitas City Council Agenda Page 8
Motion: to move forward the FY2022-25 Consolidated Plan Goals and funding allocation direction for FY2022-23 Community Development Block Grant with full funding to the established non-profits with an amendment requesting staff find a way to subgroup the requests.
Motion/Second: Mayor Tran / Councilmember Chua
Motion carried by the following roll call vote:
AYES: Councilmembers Chua, Dominguez, Phan, Vice Mayor Montano, Mayor Tran NOES: None
COMMUNITY DEVELOPMENT
15. Receive a Presentation and Provide Direction to Staff on a Draft Zoning Ordinance Amendment amending Sections of Title V, Chapter 100, and Title XI, Chapter 10, of the Milpitas Municipal Code Relating to Mobile Food Vending (Food Trucks) (Staff Contact: Ned Thomas, Planning Director, 408-586-3273 and Avery Stark, Associate Planner, 408-586-3288) Planning Director Thomas presented the staff report and Associate Planner Stark provided additional information.
The following people spoke during public comment:
1. Voltaire Montemayor
2. Felix M.
Mayor Tran asked for staff to include waste bin requirements and a designated restroom requirement for mobile food trucks at a location for more than five days.
Vice Mayor Montano asked to increase the curfew for food trucks to 11:00 p.m.
After discussion, motion: to provide direction to staff on the Zoning Ordinance Amendment setting forth regulations related to mobile food vending, changing the operating time to 11:00 p.m., including a waste bin requirement, and including a restroom requirement for food trucks that are parked five days or more in one place.
Motion/Second: Mayor Tran / Vice Mayor Montano
Motion carried by the following roll call vote:
AYES: Councilmembers Chua, Dominguez, Phan, Vice Mayor Montano, Mayor Tran NOES: None
COMMUNITY SERVICES AND SUSTAINABLE INFRASTRUCTURE
16. Review the Proposed Streets, Parks and Facilities Naming Policy and Provide Feedback to Staff (Staff Contact: Renee Lorentzen, Recreation and Community Services Director, 408-586-3409) This item was continued to the next meeting.
17. Receive a Presentation on Responses to Council Inquiries and Other Matters Related to the Proposed 2023-2027 Capital Improvement Program and Provide Feedback to Staff (Staff Contact: Michael Silveira, CIP Manager, 408-586-3303)
16 Item # C2.
April 05, 2022 Milpitas City Council Agenda Page 9
CIP Manager Silveira presented staff report.
Police Chief Hernandez and Public Works Director Ndah presented additional information on the Council Inquiry items.
Information Technology Director Nam presented additional information on the Council Chamber Audio Video System replacement project.
Mayor Tran requested the Pavement Marker Pilot Program be postponed, commented on the Sports Center visitor bleachers and asked staff to explore some more cost-effective seating for an amount not to exceed $100,000, and look for temporary strategies to be used in the meantime. He also commented on the Council Chamber Audio Visual System Replacement and stated he would like the CIP funds to focus on public safety.
Vice Mayor Montano agreed with the Mayor’s requests and commented on concerns with the McCandless and Curtis Well Projects.
Mayor Tran stated that he would like to add the Mount Shasta/South Park Victoria intersection CIP project and traffic calming at Kennedy and North Park Victoria.
The following people spoke during public comment:
1. Voltaire Montemayor
18. Receive a Presentation on the Draft Climate Action Plan Update and Provide Direction to Staff (Staff Contact: Elaine Marshall, Deputy Public Works Director, 408-586-2603) Deputy Public Works Director Marshall, and Air Quality and Climate Change Specialist with Ascent Environmental Inc., Hannah Kornfield presented the staff report.
The following people spoke during public comment:
1. Voltaire Montemayor
2. Felix M.
3. Tiffany Vuong
Vice Mayor Montano commented on rebates for upgrading appliances in older homes and asked staff to study the number of residents in Milpitas who own electric vehicles to help determine the number of charging stations needed.
Councilmember Phan asked for a more ambitious plan to include the elimination of the use of fossil fuels to achieve net-zero emissions, upgrading the City’s fleet to get it closer to 100% zero emissions by 2030, reducing fossil fuel as a backup by 2030, asked for a status update on what the City is doing with microgrid technology, have an expedited solar permitting process, and engaging the school districts on solar projects.
19. Receive Report on Community Odor Monitoring Pilot Program Results (Staff Contact: Tony Ndah, Public Works Director, 408-586-2602)
This item was not heard.
LEADERSHIP AND SUPPORT SERVICES
17 Item # C2.
April 05, 2022 Milpitas City Council Agenda Page 10
*20. Receive Report Regarding Mayoral/Council Term Limits and Provide Direction to Staff on Future Ballot Measures, If Any (Staff Contact: Christopher J. Diaz, City Attorney, 408-586-3040 and Ashwini Kantak, Assistant City Manager, 408-586-3053)
*This item was taken out of order after item 14.
City Attorney Diaz presented the staff report.
Council discussed eliminating the office of an elected Mayor, changing the length of the Mayor and Councilmember term limits, changing the term limits from consecutive to lifetime, and setting different term limits for the elected Mayor and City Councilmembers.
There was a consensus of the majority of Council to change the term limits for Councilmembers from three four-year terms to two four-year terms with the option for a third term if they run for the Mayoral seat and keep the terms limits as consecutive.
Council discussed keeping the office of Mayor as elected and change the terms from three two-year terms to two two-year terms with the option for a third term if they run for Council. After further debate Council requested this discussion on the Mayoral seat come back at a later time.
ADJOURNMENT
Mayor Tran adjourned the meeting at 11:42 PM.
Draft meeting minutes submitted by City Clerk, Wendy Wood 18 Item # C2.
MILPITAS CITY COUNCIL
AGENDA PREVIEW LIST
May 3, 2022
CLOSED SESSION
INVOCATION (assigned to Mayor Tran)
PRESENTATION
Affordable Housing and Building Safety Month (Proclamation) National Mental Health Awareness Month (Proclamation) Older Americans Month (Proclamation)
CONSENT CALENDAR
1. Receive City Council calendar for May 2022 (City Clerk) ,
2. Approve City Council Regular Meeting minutes of April 19, 2022 (City Clerk)
3. Preview list of items for May 17, 2022 (City Clerk)
4. Adopt a Resolution designating, Project No. 4304 Street Resurfacing 2022-2023 and Project No. 4303 Street Resurfacing 2021-2022 to be Funded by SB1 The Road Repair and Accountability Act of 2017 (Steve Erickson)
5. Adopt a Resolution Requesting the Allocation of Transportation Development Act (TDA), Article 3 Funding for the City’s American Disability Act (ADA) Curb Ramp Transition Program, Project No. 4283 (Steve Erickson)
6. Second reading of Ordinance adopting a Controlled Equipment Use Policy per California Assembly Bill 481 (John Torrez)
PUBLIC HEARING
7. Hold a Public Hearing and Adopt a Resolution Approving the 2023-2027 Capital Improvement Program for the City of Milpitas (Steve Erickson)
COMMUNITY DEVELOPMENT
8. Tobacco Retail License Program (Ned Thomas) Receive a Follow-up Presentation from Staff and Provide Direction on Policy Options to Regulate Tobacco Retail Permitting, Flavored Tobacco and Electronic Cigarette Products, and Tobacco Retail Locations (Ne Thomas and Jay Lee)
9. Receive a Presentation from Staff and Provide Direction on Conceptual Plans for a Proposed Five- Story Mixed-use Development Project, with up to 98 Multi-family Residential Units and 2,000 sq. ft. of Ground-Floor Commercial-Retail Space, on a 1.25-acre Vacant Site Located in the MXD Mixed-use Zoning District at 255 South Main Street (APN 083-096-008) (Ned Thomas and Lillian VanHua)
10. Mil on Main, 1380 South Main Street (Sharon Goei)
COMMUNITY SERVICES
PUBLIC SAFETY
LEADERSHIP
19 Item # C3.
11. Review List of Agenda Item Requests from Individual Councilmembers and Provide Direction to Staff, through the Prioritization Process, on the Items in Groups 1; and Provide Additional Clarification to Staff, if any, on Group 2 Items (Ashwini Kantak and Walter Rossmann,)
REPORTS
20 Item # C3.
MILPITAS CITY COUNCIL
AGENDA ITEM REQUESTS
NOTE:
Deferred and
completed
items are not
listed
2022 OPEN
Request No. Topic Submitted by:
A, F, CM, or
CCM
Date
requested or
Rec'd Form
STATUS and/or DATE scheduled
on City Council meeting agenda:
1 Bring back a conversation in the budget meeting to
fund “walking beats” in the commercial and high
crime areas Dominguez A 4/5/2022
Councilmember Dominguez will work
with the City Manager to find sources
2 Have staff prepare a report on ghost guns in the
City of Milpitas and look at any State bills that the
Council should be aware of to write a letter of
support; tie it into the gun’s buyback program to
add a further incentive for the ghost guns
Dominguez;
Tran A 4/5/2022
3 Have staff look at the center divider, see what can
be done to help improve safety, and come back
with a report by the budget meeting to see if there
is an opportunity to fund traffic mitigation Dominguez A 4/5/2022 4 Explore an ordinance or policy for parking areas in
Milpitas to reduce thefts and increase security in
the commercial retail areas Chua A 4/5/2022
5 Add Mexican Independence Day to the list of events Montano A 4/5/2022 Staff will bring forward an amendment
to the flag-raising event resolution.
6 Crossing guards at McCandless and Montague
Expressway Montano A 4/5/2022
7 Consider funding to implement and create a
homelessness encampment response team to be
dispatched to encampment sites to address
concerns, talked about creating a position to
provide mental health assistance, and would like
this to be brought back for discussion at the budget
meeting Dominguez A 3/15/2022
Will be brought forward as part of the
FY 22-23 budget discussion
21 Item # C4.
MILPITAS CITY COUNCIL
AGENDA ITEM REQUESTS
8 Consider expanding the Fee Waiver Policy eligibility
to non-profit organizations outside of Milpitas but
the events are specific to Milpitas residents Chua A 3/15/2022 Scheduled for Spring Quarterly City
Council Workplan Items Prioritization
Discussion (could be an amendment
to the existing City Council Donation
and Fee Waiver/Reduction Policy)
9 Discuss a strategy to invest money into a
neighborhood foot patrol and develop a program
within the Milpitas Police Department to increase
foot patrol in high crime areas Dominguez A 3/15/2022
Scheduled for Spring Quarterly City
Council Workplan Items Prioritization
Discussion
10 Discuss looking at another CSCDA opportunity with
Elanor property for middle-income housing. Tran A 3/15/2022 Discussion scheduled for 4/19/2022 11 Include a visitor side bleacher strategy for the
Milpitas Knights Pee-Wee football program in the
budgeting process Tran A 3/15/2022
Discussed at the 4/5/2022 City
Council meeting, staff was directed to
identify a low cost option to increase
seating capacity vs. adding
bleachers.
12 City Attorney to look at encampment ordinances
from the cities of Oakland and Los Angeles, or
other regional cities and bring a discussion on the
existing policies to back to Council before the July
recess Tran A 3/15/2022
Scheduled for discussion at the
4/19/2022 City Council meeting
13 Create a plan for future solar paneling at City
facilities Montano A 3/1/2022
Scheduled for Spring Quarterly City
Council Workplan Items Prioritization
Discussion
14 Add a mobile stage to the Juneteenth event Tran A 3/1/2022 15 Requested the City Attorney’s office explore
encampment ordinances form the City of Oakland,
Los Angeles, or other regional cities and would like
a discussion on the existing policies to be brought
back before the July recess. Tran A 2/15/2022
Scheduled for Spring Quarterly City
Council Workplan Items Prioritization
Discussion
16 Requested information on how early in the morning
trash collection can start and check if the time can
be pushed out so that it does not disrupt the nearby
neighborhood Dominguez A 2/8/2022
Email sent to the City Council on
3/15/2022
22 Item # C4.
MILPITAS CITY COUNCIL
AGENDA ITEM REQUESTS
17 Requested a program to help support the safety of
the shopping center, creating a partnership with the
businesses, and allocating at least $70,000 to
support security Dominguez A 2/1/2022
Post the pandemic lock-downs,
during the last six to nine months, the
Police Department has primarily
focused on crime prevention
community engagement events for
residential areas and has been in
process to expand such events to our
business community with crime
prevention information and events
anticipated to be scheduled for late
February/early March. The funding
allocation will be scheduled for the
Spring Quarterly City Council
Workplan Items Prioritization
Discussion. The funding allocation
will be discussed at 4/19/2022
Council meeting.
18 Look into putting the City Hall address on the
building facade Montano A 2/1/2022
Scheduled for Spring Quarterly City
Council Workplan Items Prioritization
Discussion
19 Designate the California Oak Tree as the City’s
official heritage tree Montano A 2/1/2022
Scheduled for Spring Quarterly City
Council Workplan Items Prioritization
Discussion
20 Evaluate reopening the childcare center with a non-
profit organization running the center Montano A 2/1/2022 Scheduled for Spring Quarterly City
Council Workplan Items Prioritization
Discussion
21 Look into possible rebates for Commercial
businesses similar to Valley Water District’s
conservation rebate program for residents Montano A 2/1/2022 Staff responded via email on March
15, 2022
22 Requested a meeting for the subcommittee for the
Old Town Main Street be scheduled next month Montano A 1/18/2022 Meeting was scheduled for 4/12/2022 23 Requested that Police Department work with
Safeway shopping center businesses, minority
owned small businesses, and the Chambers of
Commerce to provide a business watch
presentation Dominguez A 1/18/2021
Scheduled for Spring Quarterly City
Council Workplan Items Prioritization
Discussion
24 Explore a lease for the vacant land adjacent to the
Library for City use Tran A 1/18/2022
Scheduled for Spring Quarterly City
Council Workplan Items Prioritization
Discussion
23 Item # C4.
MILPITAS CITY COUNCIL
AGENDA ITEM REQUESTS
25 Requested staff to look into an ordinance for the
number of people allowed in a house. Montano A 12/7/2021 Scheduled for Spring Quarterly City
Council Workplan Items Prioritization
Discussion
26 Requested staff check to see if the City has an
ordinance for house numbers Chua A 12/7/2021 Email to be sent to the City Council 27 Request for the City to make the temporary third-
party food deliver fee caps permanent and add
additional provisions for enforcement Phan A 11/16/2021 Scheduled for Spring Quarterly City
Council Workplan Items Prioritization
Discussion
28 Staff to look into mural Art on Great Mall Parkway
on the VTA owned Light rail pillars Montano A 11/16/2021 Scheduled for Spring Quarterly City
Council Workplan Items Prioritization
Discussion
29 Look at creating an ordinance for a blanket
business permit that would grandfather and waive
all fees for any business started separate from their
original business if they are creating anything that is helping save lives during the pandemic. Dominguez A 11/2/2021 Scheduled for Spring Quarterly City
Council Workplan Items Prioritization
Discussion
30 Staff to look into County reimbursements to the City for the extra services provided to HomeKey. Chua A 11/2/2021 Email sent to the City Council on
4/08/2022
31 Host a Town Hall at City Hall in January, February,
and March for the community to share comments
about the issue of the unhoused. Tran A 11/2/2021
This item was postponed by Mayor
Tran due to the Omicron variant and
a rise in COVID-19 cases
24 Item # C4.
MILPITAS CITY COUNCIL
AGENDA ITEM REQUESTS
ACTIVE
Topic Submitted by:
A, F, CM, or
CCM
Date
requested or
Rec'd Form
STATUS and/or DATE scheduled
on City Council meeting agenda:
32 Fee waiver for the Filipino American South Bay
Community to hold pop-up resource fair at a City
Park Dominguez A 3/1/2022
Staff has engaged with
representatives of the organization to
identify potential eligibility avenues
such as partnering with a Milpitas
based non-profit organization
consistent with the Policy.
33 Agendize an update to the Lobbyist Ordinance for
the next meeting Chua A 3/1/2022
Discussion scheduled for 3/15 City
Council Agenda; At the 3/15/2022
Council Meeting, City Attorney was
directed to bring back a proposed
ordinance amendment for further
34 Fee waiver for the Christian Worship Center’s
Easter egg hunt Tran A 3/1/2022
Scheduled for Council Consideration
on the 4-05-2022 meeting; 4/05/2022
approved
35 A reform of the City’s Speed hump policy Tran A 3/1/2022 The review of the Speed Hump Policy
is an ongoing Council referral. Staff
agendized the item for the April 8,
2022 Transportation Subcommittee
meeting
36 Reduce the park rental fees for the Samuel Ayer
High School reunion Montano; Tran A
2/1/2022; ;
3/01/2022
Scheduled for Council Consideration
on the 4-05-2022 meeting; 4/05/2022
approved
37 Requested an appropriation in an amount not to
exceed $250,000 to procure a contract to address
the streetlights that are pending fieldwork. Tran A 2/1/2022 At this time, staff has sufficient
Council approved resources to
address the remaining streetlight
outages; however, will bring relevant
actions for Council consideration, if
needed.
38 Requested that staff study the placement of a City
sign for the Milpitas Police Department and explore
the cost of a new sign Dominguez A 1/18/2021
Staff has been working on upgrading
signage and landscaping around the
Police Department and Public Works
Building.
25 Item # C4.
MILPITAS CITY COUNCIL
AGENDA ITEM REQUESTS
39 Have a picture of Albert Vogel Sr. put up in the
Senior Center Montano A 10/19/2021
Approved to move forward at the
1/11/2022 Council meeting; Staff
engaged the artist of the existing
mural regarding this Council
approved item.
40 Requested that the City provide the Commissioners
with an appreciation gifts Chua A 10/19/2021
Approved to move forward at the
1/11/2022 Council meeting; staff has
order the gift and
41 Requested an agenda item on November 2 Council
meeting allowing the Council to rescind direction
given to 1355 California Circle and include direction
to allow the project application to move forward
without being tied to a specific plan Chua A 10/19/2021 At the 1/18/2022 council meeting,
Council voted 4-1 to rescind the
direction and direct staff and the
application to explore option one in
the presentation to amend the
General Plan and remove Council
policy for the preparation of a Specific
Plan
42 Requested the executive staff to look into reflective road markers as an effective way to reduce cars
doing donuts in the street Chua A 10/19/2021
At the 11/12/21 Transportation
Subcommittee, the Subcommittee
directed to bring back this request to
Council as part of the 2022-23 budget
process. Staff provided that
information at the CIP Study Session
on 2/8/2022.Based on Council
discussion during the 4/5/2022 City
Council meeting, the Council did not
direct staff to include this item in the
2023-2027 CIP.
43 Requested staff look into increasing the number of
Park and Recreation Commissioners from seven to
nine. Montano A 10/5/2021
Approved to move forward at the
1/11/2022 Council meeting; update to
commission by-laws and
Commissioner handbook scheduled
for approval at the 4/19/2022
meeting; Proposed Bylaw changes
scheduled for Council consideration
44 Requested staff work with the Vice Mayor and
Mayor to explore and discuss building height limits
near the hillside by January 2022 Tran A 9/21/2021
Approved to move forward at the
1/11/2022 Council meeting; l
scheduled for 6/21/2022
45 Requested the City extend the outdoor dining
options through March of next year Phan A 9/21/2021
Planning Director to provide
information on current outdoor dining
extension
26 Item # C4.
MILPITAS CITY COUNCIL
AGENDA ITEM REQUESTS
46 Work with the school district to have a contest to
create art murals for the pillars on Main Street Montano A 9/7/2021 Approved to move forward at the
1/11/2022 Council meeting
47 Partner with the Rotary Club of Silicon Andhra to
promote the stem cell donor outreach with a
webinar and campaign to help increase the number
of donors Chua A 8/17/2021
Staff will include the stem cell donor
information in regularly scheduled
wellness event
48 Include a bust of Maria Lemire on the Mural in front of the Senior Center Montano A 8/17/2021
Approved to move forward at the
1/11/2022 Council meeting
49 City to highlight mental health resources on the
website Dominguez A 8/17/2021 Staff will issue an Email 50 Look into allowing outdoor music and would like the
ordinance brought back to Council. Montano A 8/5/2021
Approved to move forward at the
1/11/2022 Council meeting;
scheduled for 6/21/2022
51 Look into opening up the Senior Center on
Saturdays for half a day Chua A 8/5/2021
As presented by staff on 1/11/2022,
this pilot is scheduled for completion
in fall 2022. In preparation for the
pilot, staff will issue a survey to
seniors asking for the types of
services they are seeking; hire staff
based on the feedback; and start the
three-month pilot in September 2022.
52 Look into bringing back a roller rink Montano A 8/5/2021 Approved to move forward at the
1/11/2022 Council meeting. Funding
for the program will need to be
prioritized through the FY 22-23
budget process.
53 Look into how the City can be a resource for small
businesses to help guide them on what to do in
terms of ADA (Americans with Disabilities Act)
requirements due to the quick changes made to
facilities during the pandemic Chua A 8/5/2021
SVEDA/SV Joint Venture hosted the
“SV Small Businesses & ADA
Compliance” webinar on 11/3/21.
Several Milpitas business reps, &
staff from Econ. Dev. & Building
participated. Staff met with reps from
CA Comm. on Disability Access to
discuss business education &
outreach.
27 Item # C4.
MILPITAS CITY COUNCIL
AGENDA ITEM REQUESTS
54 Discussion in the next fiscal year, to have a sliding scale permitting program for seniors and low-
income residence for necessary safety renovations Tran A 5/4/2021 8/09/2021 Council voted 5-0 to move
this item forward and modify the
existing Milpitas Assistance program
to include seniors; Staff will bring this
item for funding consideration as part
of the FY 2022-23 budget process
55 Discussion to reduce the City’s Senior Center
facilities deposit Montano A 5/4/2021
8/09/2021 Council voted 5-0 to refer
this item as part of the development
of the FY 2022-23 Master Fee
Schedule; Will be brought forward on
4/19 as part of Master Fee Schedule
discussion
56 Requested that the City have mini-libraries in the
low-income areas of the City. Montano A 4/20/2021
8/09/2021 Council voted 3-1-1 to
move this item forward, staff to follow
up with Vice Mayor Montano on
specific vision. Staff met with the Vice
Mayor. The City will continue to
facilitate libraries as needed but will
not take a lead role in funding or
operating them.
57 Staff to create a plan on how to increase the
number of local businesses doing business with the
City Chua A 4/6/2021
At 8/9/2021 Council meeting, Council
voted that this item may have to come
back for additional discussion
because there may be some legal
considerations.
58 Staff to look into creating a rose garden with a
children’s memorial site Montano A 4/6/2021
8/09/2021 Council voted 4-1 to
discuss details with Vice Mayor
Montano and refer this item as part of
the development of the 2023-2027
CIP; The funding for this project will
be included in the 2023-2027 Capital
Improvement Program scheduled for
adoption on May 3, 2022.
28 Item # C4.
MILPITAS CITY COUNCIL
AGENDA ITEM REQUESTS
59 Staff to look into creating “Welcome to Milpitas”
signs in key areas of in the City Montano A 4/6/2021
8/09/2021 Council voted 5-0 to move
this item forward and Council
provided direction that the signs
should align with the efforts currently
underway with the Metro Plan and
Main Street Gateway Specific Plan
process and work with private
development. Staff was directed to
work with Vice Mayor on additional
clarification. In November, Vice Mayor
Montano noted a preference for a
location on South Main Street. This
project will be added to unfunded
project list of the 2023-2027 CIP to
allow time for staff to research
potential grant funding and outreach
to local business and service clubs.
60 Staff to provide information to place a measure on
the ballot to change the directly elected Mayor to a
rotational at-large position Tran CCM 3/16/2021
To be brought forward in Spring of
2022, once new City Attorney is in
place; scheduled for 3/15/2022;
rescheduled for 4/05/2022
61 Staff to provide information on a landmark policy for the City of Milpitas Tran A 3/16/2021
8/09/2021 Council voted 5-0 to move
this item forward; this item will be
included for funding consideration in
the development of the FY 2023-27
CIP for assessment of historical and
cultural resources and development
of landmark policy; The funding for
the assessment of historical and
cultural resources and development
of a landmark policy will be included
in the 2023-2027 Capital
Improvement Program scheduled for
adoption on May 3, 2022. This project
will be scheduled to begin in FY 2022-
23. 29
Item # C4.
MILPITAS CITY COUNCIL
AGENDA ITEM REQUESTS
62 Amendment to the existing ordinance for third-party
food delivery vendor services to prohibit regulatory
response fees Phan A 2/16/2021
Agendized for discussion on
3/16/2021, deferred to 4/06/2021; CC
direction for City Attorney to prepare a
report; At the 11/12/2021
Transportation Subcommittee, the
Subcommittee directed to bring back
this request to Council as part of the
FY 2022-23 budget process.
63 Ordinance to ban vaping in the City Montano A 12/15/2020 Ordinance regarding a ban on use in
certain areas adopted by Council on
6/15/2021. Policy related to access to
products will be brought forward in
Spring 2022
64 Review City policy on speed bumps Tran A 12/15/2020
Presented to Transportation
Subcommittee on 02/12/2021;voted
on 3/16/2021 to revisit this item;
Scheduled for April 8, 2022
Transportation Subcommittee
Meeting
65 Consider change in term limits for Mayor +
Councilmembers Montano A 6/16/2020
8/4/2020: Voted 3 -2 to pursue;
2/02/2021 to agendize for a future
meeting; 3/16/2021 voted 3-1-1 to
move forward. Scheduled for
3/15/2022; rescheduled for
4/05/2022; 4/05/2022 could gave
direction to move forward with
Councilmember term limits and
discuss the Mayoral seat at a later
date
30 Item # C4.
CITY OF MILPITAS
AGENDA REPORT
(AR)
Item Title: Approve and Authorize the City Manager to Execute a Stormwater Management Facilities Operation & Maintenance Agreement for BP Products North America Inc. at 1575 Landess Avenue (Staff Contact: Steve Erickson, Engineering Director/City Engineer 408-586-3301)
Category: Consent Calendar-Community Development
Meeting Date: 4/19/2022
Recommendation: Approve and authorize the City Manager to execute a Stormwater Management Facilities Operation and Maintenance Agreement for BP Products North America Inc. for the Gas Station and Convenience Store Project at 1575 Landess Avenue.
Background:
On June 27, 2018, the Property Owner received entitlements from the City allowing for the development of the Property, including the construction of a 3,180 sq. ft. gasoline service station and convenience store, a new canopy structure over existing fuel dispensers, a new trash enclosure, offsite and onsite improvements , landscaping, irrigation, and stormwater treatment measures on a 0.56-acre site located at 1575 Landess Avenue.
In accordance with State Law and the City’s Municipal Regional Stormwater NPDES Permit (“MRP”) issued by the Regional Water Quality Control Board (“RWQCB”), new development and redevelopment projects that create and/or replace 10,000 square feet or more of impervious surface are required to incorporate Low Impact Development (“LID”) post construction stormwater control measures into the project. LID control measures include, for example, bioretention areas, flow-through planters, permeable pavement, infiltration trenches, and tree well filters.
Analysis:
MRP section C.3.h.ii.(1)(a) and Milpitas Municipal Code Title XI Chapter 16 require development project property owners meeting the 10,000 square foot threshold to execute and record a Stormwater Management Facilities Operation and Maintenance Agreement (“Agreement”) with the City for the perpetual operation, maintenance, and annual inspection of LID stormwater treatment facilities installed (Attachment 1).
The BP Arco project constructed stormwater Bio-treatment devices and BP Products North America Inc. will be responsible for the perpetual maintenance and operation of the bio-treatment areas specified in Agreement.
BP Products North America Inc has complied with the LID requirements and has executed the required Agreement, which has been reviewed by the City Attorney as to form and by the City Engineer as to content.
Policy Alternatives:
Alternative 1:
Not approve the Agreement with the City for operation, maintenance and annual inspection of stormwater treatment facilities.
Pros: None
Cons: Not approving the Agreement would cause the project to be not in compliance with the conditions of development and the City’s Municipal Code and would be prohibitive by Federal and State law. 31 Item # C5.
Reason not recommended: To comply with Federal and State law and to allow for the required City annual inspection of installed stormwater Bio-treatment devices, staff recommends approval of the Operations and Maintenance Agreement.
Fiscal Impact:
As required by the Stormwater Management Facilities Operation and Maintenance Agreement, the project developer/owner will pay the City for the required annual inspections of the installed stormwater Bio-treatment facilities.
California Environmental Quality Act:
The City Council’s approval of the agreement was already reviewed under the California Environmental Quality Act (CEQA) at the time the City Council approved the entitlements for the project thru an initial environmental assessment. The Planning Division completed an environmental assessment for the project in accordance with the California Environmental Quality Act (CEQA), which assessment determined that the proposed project is exempt from further CEQA review, each as a separate and independent basis, pursuant to Section 15183 (Projects consistent with a Commu nity Plan, General Plan and Zoning), Section 15302 (Replacement and Reconstruction) and Section 15303 (New Construction or Conversion of Small Structure) of the CEQA Guidelines. On this basis, the City Council relies on the previous CEQA review conducted i n approving this agreement.
Recommendation:
Approve and authorize the City Manager to execute a Stormwater Management Facilities Operation and Maintenance Agreement for BP Products North America Inc. Gas Station and Convenience Store project at 1575 Landess Avenue.
Attachment:
1. Stormwater Management Facilities Operation and Maintenance Agreement with Exhibit A & B
32 Item # C5.
Recording Requested by
and when Recorded, return to:
CITY OF MILPITAS
455 E. CALAVERAS BOULEVARD
MILPITAS, CA 95035
-
5479
Attn: City Clerk
(SPACE ABOVE THIS LINE RESERVED FOR RECORDER’S USE)
Document Transfer Tax is $
__0__
( )
Computed on full value of property conveyed
( ) Computed on full value less value of liens and encumbrances remaining
City transfer tax is $
__0__
APN:
088
-
36 -
002
STORMWATER MANAGEMENT FACILITIES
OPERATION AND MAINTENANCE AGREEMENT
This Stormwater Management Facilities Operation and Maintenance Agreement (“AGREEMENT”) is made and entered into this
_______
day of
________
20 2
2 (“Effective Date”), by and between
BP
Products North America Inc.
a corporation organized under and by virtue
of the laws of the State of
Maryland
(“Property Owner”) and the City of Milpitas, a municipal corporation of the State of California (“City”).
RECITALS
This AGREEMENT is made and entered into with reference to the following facts:
A.
WHEREAS
, the Property Owner is the owner of real property more particularly depicted and described on the attached as
Exhibit A
(“Property”) and fully incorporated herein by reference; and
B.
WHEREAS
,
the Property Owner received entitlements from the City allowing the development of
the Property, including the construction of
a new
gas station
with
convenien
ce
store
, utilities, and
associated offsite and onsite improvements landscaping, irrigation, and stormwater treatment measures
on a _
0.56 __ acre site
located
at ____
1575 Landess Avenue
__________ in Milpitas
and more commonly known as __
BP Arco
________,
Project No
s
. PJ
_
5035
__,
(the “Project”) on
the Property; and
subject to conditions set forth in the following (collectively “City Approvals”):
1. Resolution No. __
1 7
-
018
___
approving
Site Development Permit No.
SD17
-
0008
,
33 Item # C5.
2 2.
Resolution No. _
17 -
018
____ approving
Conditional
Use Permit
No.
UP17
-
0014
C.
WHEREAS
, discharges to the City’s municipal separate storm sewer system (“MS4”) are regulated under state and federal law pursuant to
Waste Discharge Requirements and
National
Pollutant Discharge Elimination System permit
(“MS4 Permit”)
issued by the Regional Wat
er
Quality Control Board, San Francisco Region (“
Regional Board
”).
D.
WHEREAS
,
pursuant to the requirements of the
MS4 Permit and the
City’s Stormwater and Urban
Runoff Pollution Control Ordinance as codified in Milpitas Municipal Code Chapter 16
(“Ordinance
”), the City Approvals
require
the Property Owner
to install, operate and maintain
,
at
no
cost
or
expense
to the City,
the
Permanent Stormwater Pollution Prevention Measures
(
“
BMPs
”
)
more particularly described in the City
-
approved
Stormwater
Control Operation and
Maintenance
Plan
(sometimes referred to herein as “Plan”)
for the Project attached hereto as
Exhibit B
and fully i
ncorporated herein by reference
; and
E.
WHEREAS
, the Stormwa
ter Control Operation and Maintenance Plan may be subsequently modified from time to time with City’s written approval and such changes shall be fully incorporated as part of this Agreement by this reference; and
F.
WHEREAS
, the Stormwater
Control Operation and Maintenance
Plan includes
provisions for the
BMP
Operation and Maintenance and
an annual inspection checklist for the BMPs constructed on the Property, and
G.
WHEREAS
, this Agreement memorializes the Property Owner’s maintenance, operations, and inspection obligations under the City’s Ordinance and the approved Stormwater Co
ntrol Operation
and Maintenance
Plan.
NOW, THEREFORE,
in consideration of the foregoing premise
s, the mutual covenants contained
herein, and the following terms and conditions, the parties hereto agree as follows:
SECTION 1
.
Responsibility for Operation and Maintenance:
The Property Owner, at its sole cost and expense, shall construct and insta
ll the BMPs shown in Exhibit
B in accordance with the plans approved by
and on file with
the City. Property Owner shall diligently
maintain in perpetuity the BMPs in a manner assuring peak performance at all times, shall make such changes or modifications
to the BMPs, subject to City’s prior approval as may be reasonably necessary for the BMPs to continue to operate as designed and approved and to accomplish its intended purpose and in good repair, and in compliance with all applicable Federal, State, Coun ty and local laws and
regulations, including but not limited to the Ordinance , as the same may be amended, revised, and/or
replaced from time to time. The Owner shall be responsible for the costs incurred in operating, maintaining, repairing and replacing
the BMPs. Property Owner shall
not destroy or remove the BMPs
or modify any measure in any manner that would lessen its effectiveness.
Property Owner shall
make
available copies of the approved Stormwater Co
ntrol Operation and Maintenance
Plan at the site with
the facility or property manager
.
34 Item # C5.
3 SECTION 2
:
Inspection by Property Owner:
The Property Owner, at its sole cost and expense, shall conduct annual inspections of all permanent
installed BMPs per the Plan
. The annual inspection
report shall include completion of the checklist
described in the approved
Stormwater
Control Operation and Maintenance
Plan. The BMPs must be
inspected by a qualified independent inspector who is acceptable to the City. The Property Owner shall
submit t
he Inspection Report on these BMPs to the City Engineer no later than July 15
th
of each year
.
SECTION 3
.
Facility Inspection by the City:
(a)
Right of Entry
.
The Property Owner
, on its behalf and on behalf of its successors and assigns,
grants permission to the City,
the inspectors of the Regional Board
, and local mosquito and vector
control agency
, and their
authorized agents and employees, to enter the Property, and to inspect the BMPs whenever the City deems necessary to
enforce provisions of the Ordinance, this
Agreement, or any other local or state requirements. The City may enter the premises at any reasonable time
during normal business hours and upon at least 48 hours prior written notice (except that prior written n
otice is not required in case of emergency)
to inspect the premises
related to BMPs
and BMP operation and maintenance, to inspect and copy records related to storm water compliance, and to collect samples and take measurements
related to BMPs
.
The
Property
Owner shall deposit and maintain a Private Job Account with the City a minimum balance of
Four Thousand Dollars ($4,000)
for inspection by City Staff pursuant to this Section 3. The deposit of
Four Thousand Dollars ($4,000.00)
shall be made simultaneously
with the execution
of this Agreement.
(b)
Security
.
The City may require the Owner, its successors and assigns, from time to time, to post security in a form, amount, and for a time period satisfactory to City to guarantee performance of the
obligations stated herein. Should the Owner, its successors and assigns, fail to perform the obligations under this Agreement, the City may, in the case of a cash bond, act for the Owner, its successors and assigns, using the proceeds from such cash bond,
or in the case of a surety bond,
require the surety to perform the obligations of this Agreement.
SECTION 4
.
Failure to Perform Required Facility Repairs or Maintenance by the Property Owner:
(a)
Enforcement Action
.
If the Property Owner or its successors fail to operate and maintain the BMPs in good working order and in accordance with the approved Plan and the C ity’s Ordinance,
the City
may, but is not required to, pursue any enforcement action available at law or in equity to cause the completion of all maintenance and may charge the costs of such enforcement action
against the Property Owner in any manner autho
rized by law or in equity.
(b)
City Maintenance
.
In the event of Property Owner’s failure to operate and maintain BMPs in accordance with the Plan and the City’s Ordinance, the City may also , with prior
written
notice,
enter the Property to return the BMPs
to good working order
; provided however that the Property
Owner shall have 30 days after any such notice
, or such other time provided by law,
to cure the
relevant failure and provided further that the Property Owner shall have such additional time after t
he initial 30 days to complete a cure so long as Property Owner commences the cure within the initial 30 days and diligently prosecutes the cure to completion .
Notwithstanding the foregoing,
City may in its sole discretion enter the Property to return the
BMPs to good working in an
emergency and take any other necessary action to mitigate an emergency without any notice to Property Owner.
The City is under no obligation to maintain or repair the BMPs, and this Agreement may not be construed to impose any
such obligation on the City. If the City, under
this Section 4 takes any action to return the BMPs to good working order, the Property Owner 35 Item # C5.
4 shall reimburse the City for all the
reasonable
costs and expenses incurred by the City. The City
will provide th
e Property Owner with an itemized invoice of the City’s costs and expenses and the Property Owner shall make full payments to the City within thirty (30) days of the date of the invoice. If the Property Owners fails to pay the invoice within thirty (30) days, the City
shall be
entitled
to cause a lien for any such unpaid maintenance expense bill to be recorded against the Property. In addition, the City shall be entitled to have the unpaid amount of the
invoice
placed
as a special assessment on the next regular tax bill levied against the Property, after which such assessment shall be collected in the same manner as ordinary municipal taxes are collected, and shall be subject to the same penalties and same proce
dures under foreclosure and sale in the
case of delinquency as provided for ordinary municipal taxes. The actions described in this section are in addition to and not in lieu of other legal remedies provided by law. Notwithstanding the above, it is under
stood that City is under no obligation to repair or maintain the BMPs, and in no event shall this Agreement be construed to impose any such obligation on City.
(c)
Specific Performance
. The provisions of this Agreement are expressly declared to
be for the
be
nefit of the City
. The City may bring an action to obtain specific performance of this Agreement and may recover its costs, including attorney fees, incurred in bringing such action.
SECTION 5
:
Successors and Assigns:
Property Owner
hereby declares that the Property shall be held, transferred, encumbered, used, conveyed, leased and occupied subject to the covenants, conditions, restrictions, easements and rights set forth
herein
for the use and benefit of each of the Lots. All of th e limitations, easements, uses,
obligations, covenants, restrictions and conditions stated herein shall run with the Property and shall be binding upon
Property Owner
, its successors and assigns, any and all parties having or acquiring any right, title or
interest in or to the Property or any part thereof or interest therein and shall inure to the benefit of and be binding upon each successor
-
in
-
interest thereto.
Upon transfer of the property, the Property Owner shall provide the new owner with the current Plan and
a copy of this Agreement
and shall, in any event, be released from all obligations under this Agreement as of the effective date of the
transfer of the Property.
SECTION 6
.
Indemnity:
The Property Owner
, on Property Owner’s behalf and
on behalf of all successors in interest pursuant to
Section 5 of this Agreement, shall indemnify, release, hold harmless, and defend the City and its au
thorized
agents and employees f
r
om and against
any and all
demands, suits, liabilities, fines, losses,
damages,
accidents, casualties, occurrences or claims
, including reasonable attorneys’ fees,
against the City which
may in anyway arise or relate to the construction, operation, presence, existence or maintenance of the BMPs, or from any personal injury or
property damage that may arise or relate from the City entering the property under Section 4. If
a claim is asserted against the City, its authorized agents or employees, the City shall promptly notify the Property Owner and the Property Owner shall defe nd the claim and any resulting
litigation at its sole cost and expense
, with counsel approved by City
. If any judgment is entered against the
City, or its authorized agents or employees, the Property Owner must pay all costs and expenses to satisfy the ju
dgment.
SECTION
7 .
Severability:
Invalidation of any one of the provisions of this Agreement shall in no way effect any other provisions ,
and all other provisions shall remain in full force and effect.
36 Item # C5.
5 SECTION 8
.
Non
-
Discrimination:
The Property Owner shall not discriminate, in any way, against any person on the basis of race, sex, color, age, religion, sexual orientation, actual or pe
rceived gender identity, disability, ethnicity, or national origin, in connection with or related to the performance of this Agreement.
SECTION 9
.
Governing Law:
City and Property Owner agree that the law governing this Agreement
shall be
that of the State of
California and that
Property Owner shall comply with all applicable laws, ordinances, codes and regulations of the federal, state and local governments.
SECTION 1
0 .
Recordation:
Property Owner shall, within 10 days after the effective date of t his Agreement
,
record
or ca
use
the
Agreement
to be recorded
in the Office of the Recorder,
Santa Clara County
, California, at the expense
of the
Property
Owner
, which recording
shall constitute notice of the obligations herein set forth
and
a
covenant running with the land and shall be binding upon all of the successors and assigns in title to the Property.
In the event Property Owner fails to timely record this Agreement, City
shall be authorized but
not required to record the Agreement.
SECTION 11
. Books and Records:
A.
The Property Owner shall maintain any and all ledgers, books of account, invoices, vouchers, cancelled checks, and other records or documents evidencing or relating to charges for services,
or expenditures and disbursements or in any
way relating to the performance of this Agreement for
a minimum period of three (3) years, or for any longer period required by law.
B.
Any records or documents required to be m
aintained pursuant to this Agreement shall be made
available for inspection or audit at no cost to City, at reasonable
any time during regular business
hours, upon
at least 48 hours’ prior
written request by the City Attorney, City Manager, or a designated
representative of any of these officers. Copies of such documents shall be provided to City for inspection at City Hall when it is practical to do so. Otherwise, unless an alternative is mutually agreed upon, the records shall be available at the Proper ty Owner’s address indicated for
receipt of notices in this Agreement.
SECTION 12
.
Notices:
All notices and other communications required or permitted to be given under this Agreement shall be in writing and shall be personally served or
mailed, postage prepaid and return receipt requested,
addressed to the respective parties as follows:
To CITY:
City of Milpitas
Attn:
City
Engineer
455 East Calaveras Blvd.
Milpitas, CA 95035
37 Item # C5.
6 To PROPERTY OWNER:
Attn:
Dan Fiden
,
US
Portfolio & Business
Development
Director
BP Products North America Inc.
30 South
Wacker Drive, Ste 900
Chicago, IL 60606
Notice shall be deemed effective on the date personally delivered or, if mailed, three (3) days after deposit
in the mail.
SECTION 13
.
Venue:
In the event that suit shall be brought by either party to this contract, the parties agree that venue shall be exclusively vested in the state courts of the County of Santa Clara, or if federal jurisdiction is
appropriate, exclusively in the United States District Court, Northern District of California, San Jose, California.
SECTION 14
.
Interpretation, Prior Agreements
:
This Agreement, including all Exhibits attached hereto, represents the entire understanding of the parties as to those matters contained herein. In the event that the terms specified in any of the Exhibits attached hereto conflict with any of the terms sp
ecified in the body of this Agree
ment
, the terms specified in the
body of this Agreement shall control. No prior oral or written understanding shall be of any force or effect with respect to those matters covered hereunder. This Agreement may be modified
only by a written
amendment duly executed by the parties to this Agreement.
[Signatures on Next Page]
38 Item # C5.
7 IN WITNESS WHEREOF, the Parties
execute this Stormwater Management
Facilities Operation and
Maintenance Agreement as of the last date set forth below:
PROPERTY OWNER:
By:
BP Products North America Inc.,
a corporation organized under and by virtue of the laws of the State of Maryland
By:
Name
:
Dan Fiden
Title
:
US Portfolio & Business Development Director
CITY:
CITY OF MILPITAS,
A MUNICIPAL CORPORATION
By: __________________________________
Steven McHarris, City Manager
Approved as to form:
By:_
____________________________
Christopher J. Diaz, City Attorney
Recommended for approval:
By:_______________________________
Steve
Erickson
, PE
Director of Engineering/City Engineer
Approved:
By:_____________________________
Laur
en Lai, CPA, MPA
Finance Director/Risk Manager
39 Item # C5.
8 Please note that this is a placeholder for the acknow ledgement. So
use the
most current
version of the acknowledgement
A notary public or other officer
completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California
)
County of
________________________
)
On
____________________,
before me,
____________________________, a Notary Public,
personally
appeared
__________________________________________________________________,
______ personally known to me;
______ or
______________
__________________________________________, who
proved to me on
the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their autho rized
capacity(ies), and that by his/her/their signature(s) on the instrument the person(s ),
or the entity upon
behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature
CAPACITY CLAIMED BY SIGNER:
Though statute does not require the notary to fill in the data below, doing so may prove invaluable to persons relying on the
document.
______
Individual(s)
______
Corporate Officer(s) Titles
_____________ and ____________
______
Partner(s)
_____ Limited _____ General
______
Attorney
-
in
-
Fact
______
Trustee(s)
______
Guardian/Conservator
______
Other : ______
______________________________________________
Signer is representing: ________________________________________________
ATTENTION NOTARY:
Although the information requested below is optional, it could prevent fraudulent attachment of this certificate to unauthorized document.
Title or type of document _____________________________________________
Number of pages: __________ Date of docume
nt: _________________________
Signer(s) other than named above: _____________________________________
THIS CERTIFICATE MUST BE ATTACHED TO THE DOCUMENT DESCRIBED ABOVE
40 Item # C5.
9 EXHIBIT A
Plat and Description for the site
Legal Description
The land
referred to in this commitment is situated in the City of Milpitas, County of Santa Clara,
State of California, and is described as follows:
All of Parcel
B
as shown on that certain map entitled,
Amended Record of Survey of a Portion
of Parcel
A
As sa
id Parcel is shown on that certain Record of Survey filed September 28, 1961,
in Book 138, Maps, Pages 33, 34 and 35, Santa Clara County Records, also being Portion of Lot
30 of the
Partition of the Milpitas Rancho,
filed in Book
C
miscellaneous maps,
Santa Clara County Records, and lying within the City of Milpitas, California
, which map was
filed in the office of the recorder Santa Clara County, California, on August 10, 1996 in Book 213
of Maps, at Page 25.
10 FEET WIDE PUBLIC SERVICE UTIL
ITY EASEMENT
Legal Description
All that real property situate in the City of Milpitas, County of Santa Clara, State of California
being a portion of Parcel B as said Parcel is show on the Amended Record of Survey, filed for
record on August 10, 1966, in Bo
ok 213 of Maps, at page 25, Santa Clara County Records and
being more particularly described as follows:
The Southerly 10.00 feet, Southeasterly 10.00 feet, and Easterly 10.00 feet, measured at right
exhibitangles, of said Parcel B.
41 Item # C5.
10 EXHIBIT B
Operation and Maintenance Plan
42 Item # C5.
Stormwater Management Plan
BP Arco
1575 Landess Avenue
Milpitas, CA
Prepared by:
PM Design Group
2455 Bennett Valley Road
Suite A102
Santa Rosa, CA 95404
Michelle Maynard, P.E.
PMDG Job No: C-BPW16043.0
September 1, 2017
REVISED
November 22, 2019
&
February 25, 2020
43 Item # C5.
Stormwater Management Plan ARCO Milpitas
TABLE OF CONTENTS
I. P ROJECT SETTING
I.A Project Description 1
I.B. Existing Conditions 1
I.C. Opportunities and Constraints for Stormwater Control 2 I.D. Hydromodification Applicability 2
II. SELECTION AND PRELIMINARY DESIGN OF STORMWATER TREATMENT BMPS 3 II.A General Characteristics of the Treatment Facilities 3 II.B General Characteristics of the On-Site Soils 3
III. SOURCE CONTROL MEASURES 4
TABLE 1 SOURCES AND SOURCE CONTROL BMP'S 4
IV. PERMITTING AND CODE COMPLIANCE ISSUES 5
V. D OCUMENTATION OF DRAINAGE DESIGN 6
TABLE 2 DRAINAGE MANAGEMENT AREAS 6
TABLE 3 HYDRAULIC GRADE LINE CALCULATIONS 7
VI. CERTIFICATIONS
VI.A Owners Certifications 8
VI.B Engineers Certification 9
APPENDICES
A. STORMWATER REQUIREMENTS C.3 DATA FORM 10
B. INFILTRATION/HARVESTING AND USE FEASIBILITY SCREENING WORKSHEET 15 C. VICINITY MAP 19
D. BMP SIZING CALCULATIONS 20
E. DESIGN DRAWINGS 31
F. STORM DRAIN MODELING 36
G. OPERATIONS AND MAINTENANCE PLAN 47
H. GEOTECHNICAL ENGINEERING SERVICES REPORT 56
44 Item # C5.
Stormwater Management Plan ARCO Milpitas
I. PROJECT SETTING
I.A. Project Description
The ARCO remodel project proposes to redevelop an existing fueling station on a 0.56-acre site located in a C2 general commercial section at 1575 Landess Avenue in Milpitas, California (APN # 088-36-002). The project will consist of the demolition of an existing convenience store building located on the northwest corner of Landess Avenue and South Park Victoria Drive. The new improvements consist of the construction of a new 3,180 square foot convenience store, new pavement and a new parking lot.
The proposed surface drainage for the site will generally follow the existing runoff pattern.
Drainage is directed away from the new buildings and existing fuel canopy to bio-retention areas for stormwater treatment. The runoff of the replaced impervious surface, including the building rooftops and parking area, will be treated by the bio-retention system. Any overflow from the bio-retention areas will be piped directly to the existing storm drain manhole on South Park Victoria Drive.
Project information and sizing is in the C.3. Data Form included in Appendix A. Harvesting and Use is not considered feasible according to the Screening Worksheet included in Appendix B.
There is a significant low point in the northeast corner that combined with the elevation drop and the location will preclude the use of LID treatment in the surrounding area. The use of a trench drain will minimize the area to 187 square feet. However, this minimal, untreated area represents the necessary grade breaks in front of the existing driveway, which will remain untouched. However, this untreatable impervious area will be covered by an interceptor tree credit for a planted Evergreen tree near the trash enclosure.
Although there are only minimal natural resources associated with this site every effort has been made to maximize storm water BMPs and preserve existing landscaping and trees. Please see Appendix A for further description of project impact.
I.B. Existing Site Condition
The site is currently fully developed (Vicinity Map - Appendix C). It is relatively flat with majority of the site covered by paved area. The existing landscaping areas are extremely limited and the storm runoff is untreated and sheet flows to the streets and landscape areas. 45 Item # C5.
Stormwater Management Plan ARCO Milpitas
I.C. Opportunities and Constraints for Stormwater Control Opportunities:
Capture onsite stormwater which currently runs to the street untreated and direct it through bio-retention area.
Landscaping available for planting Interceptor Trees
Label all drain inlets (in pavement area) with No Dumping - Flows to the Bay stencils. Cover the new trash enclosure.
Direct drainage from within the trash enclosure to the sanitary sewer.
Constraints:
The existing site and proposed site designs are constrained by the size of the lot as requirements for parking and vehicle and fuel truck circulation. In order to meet the require parking and circulation design requirements most of the site must be paved. The existing site soil is clay to sandy clay loam, a type D soil, as per the Geotechnical Engineering Services Report (Appendix H). This low-permeable soil will limit infiltration.
I.D. Hydromodification Applicability
A review of the HMP Applicability Map for the City of Milpitas indicates that the project sites subwatersheds and catchments are greater than or equal to 65% impervious therefore hydromodification is not applicable for this site.
46 Item # C5.
Stormwater Management Plan ARCO Milpitas
II. SELECTION AND DESIGN OF STORMWATER TREATMENT
BMPs
We have selected a Bio-Retention as the BMP of choice to treat the proposed new impervious areas (building roof, new pavement and new parking lot). Runoff from each of these areas will pass through bio-retention. Overflow from both bioretention areas will be directed to new storm drain piping connecting to the existing storm drain line on South Park Victoria Drive.
We have selected an Interceptor Tree for a stormwater treatment credit for the driveway on S.
Park Victoria Avenue that will account for runoff unable to be captured.
II.A. General Characteristics of the Treatment Facilities The selected treatment facility consists of bio-retention, which is selected to treat the anticipated pollutants of concern for this project.
Two treatment facilities will be used one southeast and one southwest. Site drainage and division, utility lines, bio-retention facilities, and details are shown in the Design Drawings included in Appendix E.
The Operations and Maintenance Plan for the treatment facilities is attached as Appendix G.
II.B. General Characteristics of On-Site Soils
Infiltration rates of existing onsite soil is 0.02 inches per hour according to the Geotechnical Report included as Appendix H.
47 Item # C5.
Stormwater Management Plan ARCO Milpitas
III. Source Control Measures
The following activities planned for this development have potential to enable pollutants to be conveyed by storm runoff:
Landscape maintenance
Refuse disposal for the retail building
Refueling of underground storage tank
Refer to Table 1 Sources and Source Control BMPs
TABLE - 1 Sources and Source Control BMPs
Potential Source Permanent BMPs Operational BMPs
Landscape / outdoor
pesticide use.
Any native trees, shrubs, and ground
cover will be preserved to the
maximum extent possible.
Landscaping will be designed to
minimize required irrigation and runoff,
to promote surface infiltration, and to
minimize the use of fertilizers and
pesticides that can contribute to
stormwater pollution.
Plantings will be selected to be
appropriate to anticipated soil and
moisture conditions.
Where possible, pest-resistant plants
will be selected, especially for locations
adjacent to hardscape.
Plants will be selected that are
appropriate for site soils, slopes,
climate, sun, wind, rain, land use, air
movement, ecological consistency, use
of recycled water (where applicable),
and plant interactions.
Landscaping contractor. Contract to
state, that landscaping is to be
maintained using Integrated Pest
Management (IPM) principles, with
minimal or no use of pesticides.
Refuse areas The refuse area will be covered or graded such that it drains to an internal drain inlet that
connects to the sanitary sewer system.
Management will enter into a
contract for periodic refuse pick up
at the site.
Trash enclosure will be periodically
inspected to remove debris.
Drain will be periodically inspected to
remove debris and prevent blockage.
Outdoor storage of
equipment or
materials
No outdoor storage of equipment or
materials will be allowed at this facility. N/A
Vehicle and
equipment cleaning.
No vehicle and equipment cleaning will
be allowed at this facility. N/A
48 Item # C5.
Stormwater Management Plan ARCO Milpitas
TABLE - 1 Sources and Source Control BMPs (continued)
IV. Permitting and Code Compliance Issues
There are no known conflicts between the proposed stormwater control plan and Santa Clara County ordinances or policies. Any conflicts that are found will be resolved through the design review process or during subsequent permitting.
Potential Source Permanent BMPs Operational BMPs
Fire Sprinkler Test
Water
Fire Sprinkler test valves will be
equipped with a means to divert test
water to the sanitary sewer.
Miscellaneous drain
or wash water
Condensate drain lines will discharge to
the sanitary sewer system or to
landscaped areas.
Rooftop mounted equipment will be
roofed or covered to prevent pollutants
from entering runoff
N/A
Sidewalks, parking
lots and drive isles
New hardscape areas drain to Bio-
retention area.
Sidewalks, parking lots, and drive
isles shall be swept regularly to
prevent accumulation of litter and
debris. Debris from pressure
washing shall be collected and not
allowed to enter the storm drain
system. Washwater containing any
cleaning agent or degreaser shall be
collected and not discharged to a
storm drain.
Building Roof Area Drainage from the building roof area will be conveyed by downspouts
directly to the sidewalk and then to the
Bio-Retentions for treatment.
Roofing, gutters, and trim shall not be
copper or other unprotected metal that
could leach into runoff.
Downspouts and gutters will be
periodically inspected to remove
debris and prevent blockage.
49 Item # C5.
Stormwater Management Plan ARCO Milpitas
V. Documentation of Drainage Design
TABLE - 2 Drainage Management Areas
DMA
Name
Surface Type Impervious Area
(square feet)
Pervious Area
(square feet)
DMA 1 ROOF, SIDEWALK, PAVEMENT AND
LANDSCAPING
11,099 1,120
DMA 2 SIDEWALK, CANOPY, AND
PAVEMENT
10,076 0
O-1 PAVEMENT 187 0
IMP Descriptions
DMA 1 and DMA 2 will be treated by bioretention facilities, labeled as IMP 1 and IMP 2, respectively.
IMPs were sized using the Worksheets - Sizing for Flow- and Volume- Based Treatment Measures (Combination Flow and Volume Approach) included in Appendix D. IMP 1 was sized based on DMA 1 specifications and for a ponding depth of 0.5 ft, the surface area will need to be 396 square feet. This surface area will meet the treatment capacity required. IMP 2 was sized based on DMA 2 specifications and showed a surface area of 302.28 square feet and ponding depth of 0.417 ft. The bioretention facility ponding depth was sized at 5 inches and the surface area at 311 square feet, which meets the treatment capacity required. These results are presented on the Water Quality Management Plan in the Design Drawings in Appendix E.
O-1 will be reduced by stormwater credit via an interceptor tree. The 15 gallon Evergreen Sweet Bay tree is located adjacent to the existing driveway in the landscape planter beside the trash enclosure.
The tree is shown on the Water Quality Management Plan and on the Planting Plan (L1), both included in the Design Drawings in Appendix E.
Storm Drain Calculations
Rainfall patterns used for the 10-year storm were based on the Rainfall Intensity Charts for the City of Milpitas. Hydraflow Hydrographs Extension for AutoCAD Civil 3D was used for steady-state storm simulation of the 10-year storm and are included in Appendix F. The flow rate for DMA 1 during a 10- year storm is 0.657 cfs. The flow rate for DMA 2 during a 10-year storm is 0.632 cfs.
Stormwater runoff for DMA 1 and 2 will be treated through the bioretention facilities (IMP 1 and IMP 2, respectively) and then routed through the proposed storm drain pipes. The overflow structure for IMP 2 connects to IMP 1 with the proposed 10 storm drain pipe. The pipe bends once after the fueling canopy before final connection to IMP 1 overflow device. IMP 1 overflow device then connects to the public storm drain line on the other side of South Park Victoria Drive. The connection is made with a 15 RCP Class III at a newly proposed manhole.
For DMA 1, stormwater runoff collection is divided into two segments. The first segment represents 3,180 sqft of roof surface area and 1,120 sqft of the landscaping behind the building. This runoff would amount to 0.2 cfs, which will be contained in the 6 slotted pipe will handle this flow even if half full, equation below:
Mannings Equation: Q=(1.49/n)*A[R^(2/3)]*√ܵ
Where n= 0.010, A= 0.10 ft2, D= 0.5 ft, P = 0.8 Rh = 0.13 (Rh =A/P), S=0.005 Q=0.21 cfs.
50 Item # C5.
Stormwater Management Plan ARCO Milpitas
The second segment represents 7,919 sqft of pavement and sidewalk runoff. When runoff leaves the landscaping from the first segment, it will capture the second segment. Therefore the slotted pipe expands to 8 to accommodate the entire DMA 1 surface runoff of 0.657 cfs. After all is captured it enters IMP 1. Assuming the pipe is flowing more than half full, the 8 storm drain line could handle up to 0.9 cfs at a 6 inch depth of flow as shown in Mannings equation below:
n= 0.010, A= 0.28 ft2, D= 0.66 ft, P = 1.4 Rh = 0.2 (Rh =A/P), S=0.005 Q=0.9 cfs.
For DMA 2, stormwater runoff from pavement flows into IMP 2 via curb cuts, while stormwater runoff from the canopy roof (1,966 sq ft; 0.126 cfs) drains flows through two 4-inch pipes prior to discharging into IMP 2. These pipes connect before discharging into IMP 1. Therefore, a 4 storm drain line flowing full would handle this flow, see equation below: n= 0.010, A= 0.09 ft2, Rh = 0.33 ft/4 =0.08, S=0.005 Q=0.18 cfs.
If stormwater is not infiltrated, runoff will exit IMP 2 though a 10 pipe that travels to IMP 1. Assuming the pipe is flowing full, the 10 storm drain line could handle up to 2.02 cfs as shown in the equation below: n= 0.010, A= 0.55 ft2, Rh = 0.83 ft/4 =0.21, S=0.005 Q=2.02 cfs.
The volume and flow for IMP 2 then combines with the non-infiltrated volume for IMP1; however, after this combination, the storm drain pipe size increases to a 15 storm drain pipe. Assuming the pipe is flowing full, the 15 storm drain line could handle up to 4.3 cfs as shown in the equation below:
n= 0.013, A= 1.23 ft2, Rh = 1.25 ft/4 = 0.31, S=0.0044
Q=4.3 cfs.
Therefore, both the 10 pipe and the 15 pipe size will be sufficiently sized for the 10-year storm event.
The discharge piping containing the treated stormwater runoff was then modeled to determine the hydraulic grade line (HGL). HGL calculations were run in Storm Sewers Extension for AutoCAD Civil 3D and are included in Appendix F. The results indicate the stormwater runoff in a 10-year storm will be contained below ground surface as shown in the table below.
TABLE - 3 Hydraulic Grade Line Calculations
Inlet
Ground
Surface 10YR 10YR
ID (ft) HGL Junction Below Ground (ft)
IMP2 Overflow 102.40 100.32 2.08
IMP1 Overflow 102.05 99.86 2.99
Manhole in ROW 104.72 99.91 4.85
51 Item # C5.
Stormwater Management Plan ARCO Milpitas
VI. Certifications
VI.A. Owners Certification
Owners Certification
Owner
1575 Landess Avenue
Milpitas, CA
The applicant accepts responsibility for interim operation and maintenance of stormwater treatment and flow-control facilities until such time as this responsibility is formally transferred to a subsequent owner.
By: Date:
Signature
Name: Title:
Print Name
52 Item # C5.
53 Item # C5.
Stormwater Management Plan ARCO Milpitas
APPENDIX A
Stormwater Requirements C.3 Data Form
54 Item # C5.
55 Item # C5.
56 Item # C5.
57 Item # C5.
58 Item # C5.
Stormwater Management Plan ARCO Milpitas
APPENDIX B
Infiltration/Harvesting and
Use Feasibility Screening Worksheet
59 Item # C5.
* For definitions, see Glossary (Attachment 1).
Santa Clara Valley
U r ban Runof f
Pollution Prevention Program
Infiltration/Harvesting and Use Feasibility Screening Worksheet Apply these screening criteria for
C.3 R egulated Pr ojects*
required to implement Provision C.3 stormwater
treatment requirements. See the Glossary (Attachment 1) f or definitions of terms marked with an asterisk (*). Contact municipal staf f to determine whether the project meets Special Project
* criteria. If the project meets Special Project
criteria, it may receive LID treatment reduction credits.
1. Applicant Info
Site Address: , CA APN:
Applicant Name: Phone No.:
Mailing Address:
2. Feasibility Screening for Infiltration
Do site soils either (a) have a saturated hydraulic conductivity* (Ksat) that will NOT allow infiltration of 80% of the annual runoff (that is, the Ksat is LESS than 1.6 inches/hour), or, if the Ksat rate is not available, (b) consist of Type C or D soils?1
ࡕYes (continue) ࡕNo – complete the Infiltration Feasibility Worksheet. If infiltration of the C.3.d amount of runoff is found to be feasible, there is no need to complete the rest of this screening worksheet.
3. Recycled Water Use
Check the box if the project is installing and using a recycled water plumbing system for non-potable water use. ࡕThe project is installing a recycled water plumbing system, and installation of a second non-potable water system for harvested rainwater is impractical, and considered infeasible due to cost considerations. Skip to Section 6.
4. Calculate the Potential Rainwater Capture Area* for Screening of Harvesting and Use Complete this section f or the entire project area. If rainwater harvesting and use is inf easible for the entire site, and the project includes one or more buildings that each have an individual roof area of 10,000 sq. ft. or more, then complete Sections 4 and 5 of this f orm f or each of these buildings.
4.1 Table 1 for (check one): The whole project Area of 1 building roof (10,000 sq.ft. min.) Table 1: Calculation of the Potential Rainwater Capture Area* The Potential Rainwater Capture Area may consist of either the entire project area or one building with a roof area of 10,000 sq. ft. or more. 1 2 3 4
Pre-Project
Impervious surface2
(sq.ft.), if applicable
Proposed Impervious Surface2 (IS), in
sq. ft.
Post-project
landscaping
(sq.ft.), if
applicableReplaced3 IS Created4 IS
a. Enter the totals for the area to be evaluated:
b. Sum of replaced and created impervious surface: N/A N/A c. Area of existing impervious surface that will NOT
be replaced by the project. N/A N/A
1 Base this response on the site-specific soil report, if available. If this is not available, consult soil hydraulic conductivity maps in Attachment 3. 2, Enter the total of all impervious surfaces, including the building footprint, driveway(s), patio(s), impervious deck(s), unroofed porch(es), uncovered parking lot (including top deck of parking structure), impervious trails, miscellaneous paving or structures, and off-lot impervious surface (new, contiguous impervious surface created from road projects, including sidewalks and/or bike lanes built as part of new street). Impervious surfaces do NOT include vegetated roofs or pervious pavement that stores and infiltrates rainfall at a rate equal to immediately surrounding, unpaved landscaped areas, or that stores and infiltrates the C.3.d amount of runoff*.
3 “Replaced” means that the project will install impervious surface where existing impervious surface is removed. 4 “Created” means the project will install new impervious surface where there is currently no impervious surface. 1575 Landess Avenue, Milpitas, CA 088-36-002
PM Design Group, Inc. 360-216-1461
2455 Bennett Valley Road, Suite A212, Santa Rosa, CA 95404 ✔
21140 13,519 5371 3,131
18,890
1306
60 Item # C5.
Inf iltration/Harvesting and Use Feasibility Screening Worksheet * For definitions, see Glossary (Attachment 1).
4.2 Answer this question ONLY if you are completing this section for the entire project area. If existing impervious surface will be replaced by the project, does the area to be replaced equal 50% or more of the existing area of impervious surface? (Refer to Table 1, Row a. Is the area in Column 2 > 50% of Column 1?) ࡕYes, C.3. stormwater treatment requirements apply to areas of impervious surface that will remain in place as well as the area created and/or replaced. This is known as the 50% rule. ࡕNo, C.3. requirements apply only to the impervious area created and/or replaced.
4.3 Enter the square footage of the Potential Rainwater Capture Area*. If you are evaluating only the roof area of a building, or you answered “no” to Question 4.2, this amount is from Row “b” in Table 1. If you answered “yes” to Question 4.2, this amount is the sum of Rows “b” and “c” in Table 1.:
square feet.
4.4 Convert the measurement of the Potential Rainwater Capture Area* from square feet to acres (divide the amount in Item 4.3 by 43,560):
acres.
5. Feasibility Screening for Rainwater Harvesting and Use
5.1 Use of harvested rainwater for landscape irrigation:
Is the onsite landscaping LESS than 2.5 times the size of the Potential Rainwater Capture Area* (Item 4.3)? (Note that the landscape area(s) would have to be contiguous and within the same Drainage Management Area to use harvested rainwater for irrigation via gravity flow.) ࡕYes (continue) ࡕNo – Direct runoff from impervious areas to self-retaining areas* OR refer to Table 11 and the curves in Appendix F of the LID Feasibility Report to evaluate feasibility of harvesting and using the C.3.d amount of runoff for irrigation.
5.2 Use of harvested rainwater for toilet flushing or non-potable industrial use:
a. Residential Projects : Proposed number of dwelling units: ______________________________ Calculate the dwelling units per impervious acre by dividing the number of dwelling units by the acres of the Potential Rainwater Capture Area* in Item 4.4. Enter the result here:
)
Is the number of dwelling units per impervious acre LESS than 100 (assuming 2.7 occupants/unit)? ࡕYes (continue) ࡕNo – complete the Harvest/Use Feasibility Worksheet. b. Commercial/Industrial Projects : Proposed interior floor area: __________________________ (sq. ft.) Calculate the proposed interior floor area (sq.ft.) per acre of impervious surface by dividing the interior floor area (sq.ft.) by the acres of the
Potential R ainwater Captur e Ar ea*
in Item 4.4. Enter the result here:
Is the square footage of the interior floor space per impervious acre LESS than 70,000 sq. ft.? ࡕYes (continue) ࡕNo – complete the Harvest/Use Feasibility Worksheet c. School Projects : Proposed interior floor area: _______________________________________ (sq. ft.) Calculate the proposed interior floor area per acre of impervious surface by dividing the interior floor area (sq.ft.) by the acres of the
Potential R ainw ater Captur e Ar ea*
in Item 4.4 . Enter the result here:
.
Is the square footage of the interior floor space per impervious acre LESS than 21,000 sq. ft.? ࡕYes (continue) ࡕNo – complete the Harvest/Use Feasibility Worksheet ✔
20196
0.46 ✔
3180
6,913
✔
61 Item # C5.
Inf iltration/Harvesting and Use Feasibility Screening Worksheet * For definitions, see Glossary (Attachment 1).
d. Mixed Commercial and Residential Use Projects
x Evaluate the residential toilet flushing demand based on the dwelling units per impervious acre for the residential portion of the project, following the instructions in Item 5.2.a, except you will use a prorated acreage of impervious surface, based on the percentage of the project dedicated to residential use. x Evaluate the commercial toilet flushing demand per impervious acre for the commercial portion of the project, following the instructions in Item 5.2.a, except you will use a prorated acreage of impervious surface, based on the percentage of the project dedicated to commercial use. e. Industrial Projects : Estimated non-potable water demand (gal/day): ___________________________ Is the non-potable demand LESS than 2,400 gal/day per acre of the Potential Rainwater Capture Area? ࡕYes (continue) ࡕNo – refer to the curves in Appendix F of the LID Feasibility Report to evaluate feasibility of harvesting and using the C.3.d amount of runoff for industrial use.
6. Use of Biotreatment
If only the “Yes” boxes were checked for all questions in Sections 2 and 5, or the project will have a recycled water system for non-potable use (Section 3), then the applicant may use appropriately designed bioretention facilities for compliance with C.3 treatment requirements. The applicant is encouraged to maximize infiltration of stormwater if site conditions allow.
7. Results of Screening Analysis
Based on this screening analysis, the following steps will be taken for the project (check all that apply):
ࡕImplement biotreatment measures (such as an appropriately designed bioretention area). ࡕConduct further analysis of infiltration feasibility by completing the Infiltration Feasibility Worksheet. ࡕConduct further analysis of rainwater harvesting and use (check one):
ࡕComplete the Rainwater Harvesting and Use Feasibility Worksheet for:
ࡕThe entire project
ࡕIndividual building(s), if applicable, describe:__________________________________ ࡕEvaluate the feasibility of harvesting and using the C.3.d amount of runoff for irrigation, based on Table 11 and the curves in Appendix F of the LID Feasibility Report ࡕEvaluate the feasibility of harvesting and using the C.3.d amount of runoff for non-potable industrial use, based on the curves in Appendix F of the LID Feasibility Report. ✔
62 Item # C5.
Stormwater Management Plan ARCO Milpitas
APPENDIX C
VICINITY MAP
1575 Landess Avenue
Milpitas, CA
63 Item # C5.
Stormwater Management Plan ARCO Milpitas
APPENDIX D
BMP SIZING CALCULATIONS
64 Item # C5.
C.3 STORMWATER HANDBOOK
Appendix B B-7
Section II. Sizing for Volume-Based Treatment Measures, continued The equation that will be used to size the BMP is:
Design Volume = (Rain Gage Correction Factor) u (Unit Basin Storage Volume) u (Drainage Area) Step 1. Determine the drainage area for the BMP, A = ____________acres Step 2.Determine percent imperviousness of the drainage area:
a. Estimate the amount of impervious surface (rooftops, hardscape, streets, and sidewalks, etc.) in the area draining to the BMP: ____________acres
b. % impervious area = (amount of impervious area/drainage area for the BMP) u 100 % impervious area = (Step 2.a/Step 1) u 100
% impervious area = __________%
Step 3. Find the mean annual precipitation at the site (MAPsite). To do so, estimate where the site is on Figure B-1 and estimate the mean annual precipitation in inches from the rain line (isopleth) nearest to the project site.6 Interpolate between isopleths if necessary.
MAPsite = _____inches
Step 4. Identify the reference rain gage closest to the project site from Table B-2b and record the MAPgage:
MAPgage = _____inches
Table B-2b: Precipitation Data for Three Reference Gages Reference Rain
Gages
Mean Annual
Precipitation (MAPgage)
(in)
San Jose Airport 13.9
Palo Alto 13.7
Morgan Hill 19.5
6 Check with the local municipality to determine if more detailed maps are available for locating the site and estimating MAP.
Section II.B Sizing V olume-Based Treatment Measures based on the Adapted CASQA Stormwater BMP Handbook Approach
0.28 0.2548
91 15
13.9 DMA 1
65 Item # C5.
SANTA CLARA VALLEY URBAN RUNOFF POLLUTION PREVENTION PROGRAM B-8 Appendix B
Section II. Sizing for Volume-Based Treatment Measures, continued Step 5 Determine the rain gage correction factor for the precipitation at the site using the information from Step 3 and Step 4.
Correction Factor = MAPsite (Step 3)/MAPgage (Step 4)
Correction Factor = ____________
Step 6. Identify the representative soil type for the BMP drainage area. a) Identify from Figure B-1 or from site soils data, the soil type that is representative of the pervious portion of the project shown here in order of increasing infiltration capability:
____ Clay (D) ____ Sandy Clay (D) ____ Clay Loam (D)
____ Silt Loam/Loam (B) ____ Not Applicable (100% Impervious) b) Does the site planning allow for protection of natural areas and associated vegetation and soils so that the soils outside the building footprint are not graded/compacted? ___ (Y/N) If your answer is no, and the soil will be compacted during site preparation and grading, the soils infiltration ability will be decreased. Modify your answer to a soil with a lower infiltration rate (e.g., Silt Loam to Clay Loam or Clay).
Modified soil type: ____________
Step 7. Determine the average slope for the drainage area for the BMP: ________% Step 8. Determine the unit basin storage volume from sizing curves. a) Slope d 1%
Use the figure at the end of this Appendix entitled Unit Basin Volume for 80% Capture, 1% Slope corresponding to the nearest rain gage: Figure B-2, B-3, or B-4 for San Jose, Palo Alto, or Morgan Hill, respectively. Find the percent imperviousness of the drainage area (from Step 2) on the x-axis. From there, find the line corresponding to the soil type (from Step 6), and obtain the unit basin storage volume on the y-axis.
Unit Basin Storage for 1% slope (UBS 1%)=____________(inches) b) Slope t 15%
Use the figure at the end of this Appendix entitled Unit Basin Volume for 80% Capture, 15% Slope corresponding to the nearest rain gage: Figure B-5, B-6, or B-7 for San Jose, Palo Alto, or Morgan Hill, respectively. Find the percent imperviousness of the drainage area (from Step 2) on the x-axis. From there, find the line corresponding to the soil type (from Step 6), and obtain the unit basin storage volume on the y-axis.
Unit Basin Storage for 15% slope (UBS 15%)=____________(inches) Section II.B Adapted CASQA Stormwater BMP Handbook Approach (continued)
1.08 X
N
Clay Loam
1.1 0.58
0.6 DMA 1
66 Item # C5.
C.3 STORMWATER HANDBOOK
Appendix B B-9
Section II. Sizing for Volume-Based Treatment Measures, continued c) Slope > 1% and < 15%
Find the unit basin volumes for 1% and 15% using the techniques in Steps 8.a and 8.b and interpolate by applying a slope correction factor per the following formula:
Unit Basin Storage volume (UBS x)= ____________(inches) (corrected forslope ofsite)
Step 9. Determine the Adjusted Unit Basin Storage Volume for the site, using the following equation:
Adjusted UBS = Rain Gage Correction Factor u Unit Basin Storage Volume Adjusted UBS = (Step 5) u (Step 8)
Adjusted UBS = _______inches
Step 10. Determine the BMP Design Volume, using the following equation:
Design Volume = Adjusted Unit Basin Storage Volume u Drainage Area Design Volume = (Step 9) u (Step 1) u 1 foot/12 inch
Design Volume = _______ acre-feet u 43,560 square feet/acre =_______ cubic feet UBSx = UBS 1% + (UBS15% - UBS1%) u (X%-1%) / (15% -1%)
= (Step 8a) + (Step 8b- Step 8a) u (X%-1%)/(15%-1%)
Where UBSx = Unit BasinStorage volume for drainage area of intermediate slope, X % Section II.B. Adapted CASQA Stormwater BMP Handbook Approach ( continued)
0.58 0.626
0.0146 636
DMA 1
67 Item # C5.
C.3 STORMWATER HANDBOOK
Appendix B B-15
Section IV. Sizing for Flow- and Volume- Based Treatment Measures (Combination Flow and Volume Approach)
For bioretention areas and flow-through planters, the following approach may be used to take into consideration both the flow of stormwater through the planting media and the volume of stormwater in the surface ponding area. Note that the approach assumes that all of the design rainfall becomes runoff, and thus it is appropriate for use where the drainage area to the treatment measure is mostly impervious. Contributing pervious surfaces can be converted to equivalent impervious surface using the procedure outlined in Step 1.
Step 1. Contributing drainage area to the treatment measure: _______ sq. ft.
Is the contributing drainage area 100% impervious? ____ Yes ____ No If yes, skip to Step 2c and fill in the drainage area as the effective impervious area.
Step 2. Determine the effective impervious surface area draining to the treatment measure:
a. Impervious surface area draining to the treatment measure: _______ sq. ft. b. Pervious surface areadraining to the treatment measure: _______ sq. ft.
F or s mal l g r ass or l and sc aped ar eas, mu l t i pl y t he per v i ou s s u r f ac e ar ea by a r u nof f c oef f i c i ent of 0 .1 0 t o c ompu t e t he equ i v al ent i mper v i ou s su r f ac e ar ea. c. Effective impervious area = (pervious area × 0.10) + impervious area Effective impervious area = (Step 2.b x 0.10) + Step 2.a Effective impervious area = _______ sq. ft.
Step 3. Determine the required treatment volume using Adapted CASQA Stormwater BMP Handbook Approach (Worksheet Section II.B, Steps 9 and 10). Copy the results here:
Adjusted Unit Basin Storage (UBS) Volume: _______ in.
Water Quality Design (WQD) Volume: _______ cu. ft.
Step 4. Determine the design rainfall intensity (Uniform Intensity Approach, Section III.C, Step 3):
Design Rainfall Intensity: __0.2__ in/hr
Step 5. Assume that the rain event that generates the Unit Basin Storage Volume of runoff occurs at the design rainfall intensity for the entire length of the storm. Calculate the duration of the storm by dividing the adjusted Unit Basin Storage Volume by the design rainfall intensity. In other words, determine the amount of time required for the Unit Basin Storage Volume to be achieved at the design intensity rate.
Duration = UBS Volume (inches) ÷ Rainfall Intensity (inches/hour) Duration = (Step 3) ÷ 0.2 in/hr = _________ hrs.
12219
X
11099
1120
11211
0.626
636
3.13 DMA 1
68 Item # C5.
SANTA CLARA VALLEY URBAN RUNOFF POLLUTION PREVENTION PROGRAM B-16 Appendix B
IV.Sizing for Flow- and Volume-Based Treatment Measures, continued Step 6. Make a preliminary estimate of the surface area of the bioretention facility by multiplying the area of impervious surface to be treated by a sizing factor of 0.03.
Estimated Surface Area = Total Effective Impervious Area × 0.03 Estimated Surface Area = __________ sq. ft. × 0.03 = _________ sq. ft. (Step 2.c)
Step 7. Calculate the volume of runoff that filters through the biotreatment soil at a rate of 5 inches per hour (the design surface loading rate for bioretention facilities), for the duration of the storm calculated in Step 5.
Volume of Treated Runoff = Estimated Surface Area × 5 in/hr × (1 ft/12 in) × Duration Volume of Treated Runoff = ________ sq. ft. × 5/12 × _____ hrs. = ________ cu. ft. (Step 6) (Step 5)
Step 8. Calculate the portion of the water quality design (WQD) volume remaining after treatment is accomplished by filtering through the biotreatment soil. The result is the amount that must be stored in the ponding area above the bioretention surface area estimated in Step 6.
Volume in ponding area = WQD Volume Volume of Treated Runoff Volume in ponding area = ________ cu. ft. ________ cu. ft. = _________ cu. ft. (Step 3) ( Step 7)
Step 9. Calculate the depth of the volume in the ponding area by dividing this volume by the estimated surface area in Step 6.
Depth of ponding = Volume in Ponding Area ÷ Estimated Surface Area Depth of ponding = __________ cu. ft. ÷ __________ sq. ft. = _________ ft. (Step 8) (Step 6)
Step 10. Check to see if the average ponding depth is between 0.5 and 1.0 feet (6 and 12 inches), which is the range of allowable ponding depths in a bioretention facility or flow-through planter (0.5 feet is recommended). If the ponding depth is less than 0.5 feet, the bioretention design can be optimized with a smaller surface area (i.e., repeat Steps 6 through 9 with a smaller surface area). If the ponding depth is greater than 1 foot, a larger surface area will be required (i.e., repeat Steps 6 through 9 with a larger surface area).
11211 336
336 3.13 438
636 438 198
198 396 0.5
DMA 1
69 Item # C5.
C.3 STORMWATER HANDBOOK
Appendix B B-7
Section II. Sizing for Volume-Based Treatment Measures, continued The equation that will be used to size the BMP is:
Design Volume = (Rain Gage Correction Factor) u (Unit Basin Storage Volume) u (Drainage Area) Step 1. Determine the drainage area for the BMP, A =___________acres Step 2. Determine percent imperviousness of the drainage area:
a. Estimate the amount of impervious surface (rooftops, hardscape, streets, and sidewalks, etc.) in the area draining to the BMP: ____________acres
b. % impervious area = (amount of impervious area/drainage area for the BMP) u 100 % impervious area = (Step 2.a/Step 1) u 100
% impervious area = __________%
Step 3. Find the mean annual precipitation at the site (MAPsite). To do so, estimate where the site is on Figure B-1 and estimate the mean annual precipitation in inches from the rain line (isopleth) nearest to the project site.6 Interpolate between isopleths if necessary.
MAPsite = _____inches
Step 4. Identify the reference rain gage closest to the project site from Table B-2b and record the MAPgage:
MAPgage = _____inches
Table B-2b: Precipitation Data for Three Reference Gages Reference Rain
Gages
Mean Annual
Precipitation (MAPgage)
(in)
San Jose Airport 13.9
Palo Alto 13.7
Morgan Hill 19.5
6 Check with the local municipality to determine if more detailed maps are available for locating the site and estimating MAP.
Section II.B Sizing V olume-Based Treatment Measures based on the Adapted CASQA Stormwater BMP Handbook Approach
0.23 0.23
100
15 13.9
DMA 2
70 Item # C5.
SANTA CLARA VALLEY URBAN RUNOFF POLLUTION PREVENTION PROGRAM B-8 Appendix B
Section II. Sizing for Volume-Based Treatment Measures, continued Step 5 Determine the rain gage correction factor for the precipitation at the site using the information from Step 3 and Step 4.
Correction Factor = MAPsite (Step 3)/MAPgage (Step 4)
Correction Factor = ____________
Step 6. Identify the representative soil type for the BMP drainage area. a) Identify from Figure B-1 or from site soils data, the soil type that is representative of the pervious portion of the project shown here in order of increasing infiltration capability:
____ Clay (D) ____ Sandy Clay (D) ____ Clay Loam (D)
____ Silt Loam/Loam (B) ____ Not Applicable (100% Impervious) b) Does the site planning allow for protection of natural areas and associated vegetation and soils so that the soils outside the building footprint are not graded/compacted? ___ (Y/N) If your answer is no, and the soil will be compacted during site preparation and grading, the soil’s infiltration ability will be decreased. Modify your answer to a soil with a lower infiltration rate (e.g., Silt Loam to Clay Loam or Clay).
Modified soil type: ____________
Step 7. Determine the average slope for the drainage area for the BMP: ________% Step 8. Determine the unit basin storage volume from sizing curves. a) Slope d 1%
Use the figure at the end of this Appendix entitled “Unit Basin Volume for 80% Capture, 1% Slope” corresponding to the nearest rain gage: Figure B-2, B-3, or B-4 for San Jose, Palo Alto, or Morgan Hill, respectively. Find the percent imperviousness of the drainage area (from Step 2) on the x-axis. From there, find the line corresponding to the soil type (from Step 6), and obtain the unit basin storage volume on the y-axis.
Unit Basin Storage for 1% slope (UBS 1%)=____________(inches) b) Slope t 15%
Use the figure at the end of this Appendix entitled “Unit Basin Volume for 80% Capture, 15% Slope” corresponding to the nearest rain gage: Figure B-5, B-6, or B-7 for San Jose, Palo Alto, or Morgan Hill, respectively. Find the percent imperviousness of the drainage area (from Step 2) on the x-axis. From there, find the line corresponding to the soil type (from Step 6), and obtain the unit basin storage volume on the y-axis.
Unit Basin Storage for 15% slope (UBS 15%)=____________(inches) Section II.B Adapted CASQA Stormwater BMP Handbook Approach (continued)
1.08 X
N
Clay
1.75 0.58
0.606
DMA 2
71 Item # C5.
C.3 STORMWATER HANDBOOK
Appendix B B-9
Section II. Sizing for Volume-Based Treatment Measures, continued c) Slope > 1% and < 15%
Find the unit basin volumes for 1% and 15% using the techniques in Steps 8.a and 8.b and interpolate by applying a slope correction factor per the following formula:
Unit Basin Storage volume (UBS x)= ____________(inches) (corrected for slope of site)
Step 9. Determine the Adjusted Unit Basin Storage Volume for the site, using the following equation:
Adjusted UBS = Rain Gage Correction Factor u Unit Basin Storage Volume Adjusted UBS = (Step 5) u (Step 8)
Adjusted UBS = _______inches
Step 10. Determine the BMP Design Volume, using the following equation:
Design Volume = Adjusted Unit Basin Storage Volume u Drainage Area Design Volume = (Step 9) u (Step 1) u 1 foot/12 inch
Design Volume = _______ acre-feet u 43,560 square feet/acre = _______ cubic feet UBSx = UBS 1% + (UBS15% - UBS1%) u (X%-1%) / (15% -1%)
= (Step 8a) + (Step 8b- Step 8a) u (X%-1%)/(15%-1%)
Where UBSx = Unit BasinStorage volume for drainage area of intermediate slope, X % Section II.B. Adapted CASQA Stormwater BMP Handbook Approach ( continued)
0.581
0.628
0.0120
DMA 2
524
72 Item # C5.
C.3 STORMWATER HANDBOOK
Appendix B B-15
Section IV. Sizing for Flow- and Volume- Based Treatment Measures (Combination Flow and Volume Approach)
For bioretention areas and flow-through planters, the following approach may be used to take into consideration both the flow of stormwater through the planting media and the volume of stormwater in the surface ponding area. Note that the approach assumes that all of the design rainfall becomes runoff, and thus it is appropriate for use where the drainage area to the treatment measure is mostly impervious. Contributing pervious surfaces can be converted to equivalent impervious surface using the procedure outlined in Step 1.
Step 1. Contributing drainage area to the treatment measure: _______ sq. ft.
Is the contributing drainage area 100% impervious? ____ Yes ____ No If yes, skip to Step 2c and fill in the drainage area as the effective impervious area.
Step 2. Determine the effective impervious surface area draining to the treatment measure:
a. Impervious surface area draining to the treatment measure: _______ sq. ft. b. Pervious surface area draining to the treatment measure: _______ sq. ft.
F or s mal l g r ass or l and sc aped ar eas, mu l t i pl y t he per v i ou s s u r f ac e ar ea by a r u nof f c oef f i c i ent of 0 .1 0 t o c ompu t e t he equ i v al ent i mper v i ou s su r f ac e ar ea. c. Effective impervious area = (pervious area × 0.10) + impervious area Effective impervious area = (Step 2.b x 0.10) + Step 2.a Effective impervious area = _______ sq. ft.
Step 3. Determine the required treatment volume using Adapted CASQA Stormwater BMP Handbook Approach (Worksheet Section II.B, Steps 9 and 10). Copy the results here:
Adjusted Unit Basin Storage (UBS) Volume: _______ in.
Water Quality Design (WQD) Volume: _______ cu. ft.
Step 4. Determine the design rainfall intensity (Uniform Intensity Approach, Section III.C, Step 3):
Design Rainfall Intensity: __0.2__ in/hr
Step 5. Assume that the rain event that generates the Unit Basin Storage Volume of runoff occurs at the design rainfall intensity for the entire length of the storm. Calculate the duration of the storm by dividing the adjusted Unit Basin Storage Volume by the design rainfall intensity. In other words, determine the amount of time required for the Unit Basin Storage Volume to be achieved at the design intensity rate.
Duration = UBS Volume (inches) ÷ Rainfall Intensity (inches/hour) Duration = (Step 3) ÷ 0.2 in/hr = _________ hrs.
10,076
X
10,076
0 10,076
524
0.628
3.14 DMA 2
73 Item # C5.
SANTA CLARA VALLEY URBAN RUNOFF POLLUTION PREVENTION PROGRAM B-16 Appendix B
IV. Sizing for Flow- and Volume-Based Treatment Measures, continued Step 6. Make a preliminary estimate of the surface area of the bioretention facility by multiplying the area of impervious surface to be treated by a sizing factor of 0.03.
Estimated Surface Area = Total Effective Impervious Area × 0.03 Estimated Surface Area = __________ sq. ft. × 0.03 = _________ sq. ft. ( Step 2.c)
Step 7. Calculate the volume of runoff that filters through the biotreatment soil at a rate of 5 inches per hour (the design surface loading rate for bioretention facilities), for the duration of the storm calculated in Step 5.
Volume of Treated Runoff = Estimated Surface Area × 5 in/hr × (1 ft/12 in) × Duration Volume of Treated Runoff = ________ sq. ft. × 5/12 × _____ hrs. = ________ cu. ft. (Step 6) (Step 5)
Step 8. Calculate the portion of the water quality design (WQD) volume remaining after treatment is accomplished by filtering through the biotreatment soil. The result is the amount that must be stored in the ponding area above the bioretention surface area estimated in Step 6.
Volume in ponding area = WQD Volume – Volume of Treated Runoff Volume in ponding area = ________ cu. ft. – ________ cu. ft. = _________ cu. ft. (Step 3) (Step 7)
Step 9. Calculate the depth of the volume in the ponding area by dividing this volume by the estimated surface area in Step 6.
Depth of ponding = Volume in Ponding Area ÷ Estimated Surface Area Depth of ponding = __________ cu. ft. ÷ __________ sq. ft. = _________ ft. (Step 8) (Step 6)
Step 10. Check to see if the average ponding depth is between 0.5 and 1.0 feet (6 and 12 inches), which is the range of allowable ponding depths in a bioretention facility or flow-through planter (0.5 feet is recommended). If the ponding depth is less than 0.5 feet, the bioretention design can be optimized with a smaller surface area (i.e., repeat Steps 6 through 9 with a smaller surface area). If the ponding depth is greater than 1 foot, a larger surface area will be required (i.e., repeat Steps 6 through 9 with a larger surface area).
10,076 302.28
302.28 3.14 395.48
524 395.48 128.52
128.52 302.28 0.425
DMA 2
74 Item # C5.
Stormwater Management Plan ARCO Milpitas
APPENDIX E
DESIGN DRAWINGS
75 Item # C5.
02/25/20
2/25/2020
2455 Bennett Valley Rd.
Suite A102
Santa Rosa, CA 95404
Ph. 760-583-3388
Kyle Flaming PE
Civil Engineer
FEBRUARY 25, 2020Seal
Civil Engineering
GRADING PLAN
C 300
Know what's below.
Call before you dig.
LEGEND:
GRADING KEY NOTES:
BENCHMARKS
CAUTION NOTICE TO CONTRACTOR
FLOODNOTE
PAVING NOTE
BASIS OF BEARINGS
76 Item # C5.
02/25/20
2/25/2020
2455 Bennett Valley Rd.
Suite A102
Santa Rosa, CA 95404
Ph. 760-583-3388
Kyle Flaming PE
Civil Engineer
FEBRUARY 25, 2020Seal
Civil Engineering
C 500
BENCHMARKS
CAUTION NOTICE TO CONTRACTOR
Know what's below.
Call before you dig.
FLOODNOTE
LEGEND:
SEE
BIORETENTION
DETAIL
FLOW
S TO
BIORETENTION
COBBLE SPILLWAY
WITHOUT CURBS
(FROM CURB CUT)
PIPE DISCHARGE INTO BASIN
(WITH ROCK COBBLE)
5" TO INLET
77 Item # C5.
02/25/20
2/25/2020
2455 Bennett Valley Rd.
Suite A102
Santa Rosa, CA 95404
Ph. 760-583-3388
Kyle Flaming PE
Civil Engineer
FEBRUARY 25, 2020Seal
Civil Engineering
LEGEND:
Know what's below.
Call before you dig.
FLOODNOTE
BENCHMARKS
CAUTION NOTICE TO CONTRACTOR
BASIS OF BEARINGS
STORM DRAIN KEY NOTES:
STORM DRAIN PLAN
C 530
78 Item # C5.
Stormwater Management Plan ARCO Milpitas
APPENDIX F
STORM DRAIN MODELING
79 Item # C5.
80 Item # C5.
81 Item # C5.
82 Item # C5.
83 Item # C5.
Hydraflow Table of Contents DMA1North.gpw
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Tuesday, 02 / 25 / 2020 10 - Year
Hydrograph Reports................................................................................................................... 1 Hydrograph No. 1, Rational, DMA 1......................................................................................... 1 Hydrograph No. 2, Rational, DMA 1 - Building Roof and Landscaping.................................... 2 Hydrograph No. 3, Rational, DMA 2 - Roof Canopy................................................................. 3 Hydrograph No. 4, Rational, DMA 2 - Pavement and Sidewalk............................................... 4 IDF Report.................................................................................................................... 5 84 Item # C5.
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Tuesday, 02 / 25 / 2020 Hyd. No. 1
DMA 1
Hydrograph type = Rational Peak discharge = 0.657 cfs Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 197 cuft
Drainage area = 0.280 ac Runoff coeff. = 0.83*
Intensity = 2.828 in/hr Tc by User = 5.00 min
IDF Curve = basedonrainfallchartsmilpitas.IDFAsc/Rec limb fact = 1/1 * Composite (Area/C) = [(0.255 x 1.00) + (0.026 x 0.10)] / 0.280 1 0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
DMA 1
Hyd. No. 1 -- 10 Year
Hyd No. 1
85 Item # C5.
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Tuesday, 02 / 25 / 2020 Hyd. No. 2
DMA 1 - Building Roof and Landscaping
Hydrograph type = Rational Peak discharge = 0.207 cfs Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 62 cuft
Drainage area = 0.099 ac Runoff coeff. = 0.74
Intensity = 2.828 in/hr Tc by User = 5.00 min
IDF Curve = basedonrainfallchartsmilpitas.IDFAsc/Rec limb fact = 1/1 2 0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
DMA 1 - Building Roof and Landscaping
Hyd. No. 2 -- 10 Year
Hyd No. 2
86 Item # C5.
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Tuesday, 02 / 25 / 2020 Hyd. No. 3
DMA 2 - Roof Canopy
Hydrograph type = Rational Peak discharge = 0.126 cfs Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 38 cuft
Drainage area = 0.045 ac Runoff coeff. = 0.99
Intensity = 2.828 in/hr Tc by User = 5.00 min
IDF Curve = basedonrainfallchartsmilpitas.IDFAsc/Rec limb fact = 1/1 3 0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
DMA 2 - Roof Canopy
Hyd. No. 3 -- 10 Year
Hyd No. 3
87 Item # C5.
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Tuesday, 02 / 25 / 2020 Hyd. No. 4
DMA 2 - Pavement and Sidewalk
Hydrograph type = Rational Peak discharge = 0.506 cfs Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 152 cuft
Drainage area = 0.181 ac Runoff coeff. = 0.99
Intensity = 2.828 in/hr Tc by User = 5.00 min
IDF Curve = basedonrainfallchartsmilpitas.IDFAsc/Rec limb fact = 1/1 4 0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
DMA 2 - Pavement and Sidewalk
Hyd. No. 4 -- 10 Year
Hyd No. 4
88 Item # C5.
Hydraflow Rainfall Report
5 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Tuesday, 02 / 25 / 2020 Return Intensity-Duration-Frequency Equation Coefficients (FHA) Period
(Yrs) B D E (N/A)
1 0.0000 0.0000 0.0000 --------
2 0.0000 0.0000 0.0000 --------
3 0.0000 0.0000 0.0000 --------
5 0.0000 0.0000 0.0000 --------
10 6.9108 0.2000 0.5420 --------
25 0.0000 0.0000 0.0000 --------
50 0.0000 0.0000 0.0000 --------
100 0.0000 0.0000 0.0000 --------
File name: basedonrainfallchartsmilpitas.IDF
Intensity = B / (Tc + D)^E
Return Intensity Values (in/hr)
Period
(Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 2.83 1.96 1.58 1.36 1.20 1.09 1.00 0.93 0.88 0.83 0.79 0.75 25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tc = time in minutes. Values may exceed 60.
Rainfall Precipitation Table (in)
1 - Commercial\Independent\Petroleum\C-BPW16043.0 - Milpitas, CA\03 - Project Info\Stormwater\SWMP\milpitas.pcp Storm
Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 1.30 0.00 0.00 1.60 2.81 4.95 2.80 6.39
SCS 6-Hr 0.00 0.00 0.00 1.22 0.00 0.00 2.41 0.00
Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Custom 1.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00
89 Item # C5.
Stormwater Management Plan ARCO Milpitas
APPENDIX G
BMP Operation and Maintenance Plan
90 Item # C5.
02/25/20
2/25/2020
2455 Bennett Valley Rd.
Suite A102
Santa Rosa, CA 95404
Ph. 760-583-3388
Kyle Flaming PE
Civil Engineer
FEBRUARY 25, 2020Seal
Civil Engineering
C 500
BENCHMARKS
CAUTION NOTICE TO CONTRACTOR
Know what's below.
Call befor e you dig.
FLOODNOTE
LEGEND:
SEE
BIORETENTION
DETAIL
FLOWS TO
BIORETENTION
COBBLE SPILLWAY
WITHOUT CURBS
(FROM CURB CUT)
PIPE DISCHARGE INTO BASIN
(WITH ROCK COBBLE)
5" TO INLET
91 Item # C5.
Stormwater Management Plan ARCO Milpitas
Means to Finance and Implement BMP Maintenance
Proper operation and maintenance of Stormwater Management Facilities will be the responsibility of the property owner in perpetuity.
The applicant will prepare and submit, for review and approval by Santa Clara County, a Stormwater Control Operation and Maintenance Agreement before sale, transfer, or permanent occupancy of the site. The applicant accepts responsibility for maintenance of stormwater management facilities until such responsibility is transferred to another entity.
It is the responsibility of Owner and the facility management to provide for the regular maintenance of both structural and non-structural BMPs. Owner shall pass on this responsibility to successive owners/restaurant managers to insure that the intent of the Water Quality Management Plan is carried out for the entire life of the site. Non-structural BMPs shall be implemented per the Water Quality Management Plan. Structural BMPs shall be inspected at a minimum of every six months or less as required by Santa Clara County to ensure that the BMPs are in compliance with the regulations set forth in the Water Quality Management Plan.
Structural BMPs shall be cleaned and operational no later than October 1st of each year before the start of the rainy season. Records shall be kept on site indicating when maintenance has been performed on each structural or non-structural BMP. BMP maintenance records shall be made available to County officials upon request.
Owner agrees to annex into a Community Facilities District to be established and to execute and record a covenant running with the land, Stormwater Management Facilities Operation and Maintenance Agreement, and right-of-entry with Santa Clara County.
Summary of Maintenance Requirements
Bio-retentions remove pollutants as the runoff passes through sandy loam and open- graded gravel layers. A perforated pipe under drain conveys treated stormwater to the site storm drain system. Routine maintenance is needed to ensure that flow is unobstructed, that erosion is prevented, and that soils are held together by plant roots and are plants are biologically active. Typical routine maintenance consists of the following:
Inspect bio-retention for evidence of instability or erosion and correct as necessary. Clear any obstructions and remove any accumulation of sediment.
Examine rock or other material used as a splash pad and replenish if necessary. Inspect overflow inlets for signs of sediment build up or plugging. Inspect bioretention area for ponded water. If ponded water does not drain within 2-3 days, till and replace the surface soil and replant. Observe performance of engineering soil layers in the Bio-retention areas for uniform percolation throughout. If portions of the Bio-retention do not drain at the required 5/hour, the soil layers should be removed and replaced. Remove any debris or accumulations of sediment.
Examine the vegetation to ensure that it is healthy and dense enough to provide filtering and to protect soils from erosion. Replenish mulch as necessary, remove fallen leaves and debris, prune large shrubs or trees and mow turf areas. Confirm that irrigation is adequate and not excessive. Replace dead plants and remove invasive vegetation.
92 Item # C5.
Stormwater Management Plan ARCO Milpitas
BMP Inspection and Maintenance Schedule and Checklist
Schedule Observation Maintenance Activity
Before the start of
each rainy season
and after each
heavy rain event.
Bio-retentions:
Inspect vegetation for evidence of
damage or instability.
Observe plant growth. Vegetation
should be dense enough to provide
filtering and to protect soils from
erosion.
Inspect for ponded water.
Inspect vegetation for invasion of
plants and weeds.
Check that mulch is at appropriate
depth (3-inches per soil
specifications). Inspect energy
dissipation at the inlet to ensure it is
functioning adequately, and there is
no scour of the surface mulch.
Remove any damaged,
diseased, or unstable
vegetation and replace in-
kind with viable vegetation.
Remove fallen leaves and
debris, prune large shrubs or
trees and mow turf areas.
Till and replace the surface
soil and replant if ponded
water does not drain within
2-3 days.
Remove any invasive plants,
weeds or undesirable
vegetation and if necessary
replace in-kind with viable
healthy plantings.
Replenish mulch as
necessary to meet specs.
Before the start of
each rainy season
and after each
heavy rain event.
Bio-retention Curb Cut Inlets:
Inspect drain inlets for accumulation
of debris and sediment.
Inspect drain inlets for obstructions
to inlet and out piping including
perforated planter drain lines.
Remove any debris and
sediment. Clean inlet as
necessary.
Remove any obstructions to
inlet and outlet piping. Clean
inlet as necessary.
Before the start of
each rainy season
and after each
heavy rain event.
Drainage System Structures, i.e. Overflow
and underdrains:
Inspect drainage structures for
accumulation of debris and sediment.
Inspect drain inlets for obstructions
to inlet and out piping.
Remove any debris and
sediment. Clean inlet as
necessary.
Remove any obstructions to
inlet and outlet piping.
Before the start of
each rainy season
and after each
heavy rain event.
Catch Basin and Trash Screen:
Inspect catch basin and trash screen
for accumulation of debris and
sediment.
Remove any debris and
sediment. Clean inlet as
necessary.
Before the start of
each rainy season.
Building Roof Area:
Inspect roof gutters and downspouts
for accumulation of debris or
obstructions.
Remove any debris and
obstructions and clean
gutters as necessary.
93 Item # C5.
Stormwater Management Plan ARCO Milpitas
Use of Pesticides
The use of pesticides and quick release fertilizers shall be minimized, and the principles of integrated pest management (IMP) followed:
1. Employ non-chemical controls (biological, physical, and cultural controls) before using chemicals to treat a pest problem.
2. Prune plants properly and at the appropriate time of year.
3. Provided adequate irrigation for landscape plants. Do not over water.
4. Limit fertilizer use unless soil testing indicates a deficiency. Slow-release or organic fertilizer is preferable. Check with municipality for specific requirements.
5. Pest control should avoid harming non-target organisms, or negatively affecting air and water quality and public health. Apply chemical controls only when monitoring indicates that preventative and non-chemical methods are not keeping pests below acceptable levels. When pesticides are required, apply the least toxic and the least persistent pesticide that will provide adequate pest control. Do not apply pesticides on a preschedule basis.
6. Sweep up spilled fertilizer and pesticides. Do not wash away or bury such spills.
7. Do not over apply pesticide. Spray only where the infestation exists. Follow the manufacturers instructions for mixing and applying materials.
8. Only licensed, trained pesticide applicators shall apply pesticides.
9. Apply pesticides at the appropriate time to maximize their effectiveness and minimize the likelihood of discharging pesticides into runoff. With the exception of pre-emergent pesticides, avoid application if rain is expected.
10. Unwanted/unused pesticides shall be disposed as hazardous waste.
Vector Control
Standing water shall not remain in the treatment measures for more than five days, to prevent mosquito generation. Should any mosquito issues arise, contact the Santa Clara Valley Vector Control District (District). Mosquito larvicides shall be applied only when absolutely necessary, as indicated by the District, and then only by a licensed professional or contractor. Contact information for the District is provided below.
Santa Clara Valley Vector Control District
1580 Berger Dr.
San Jose, California 95112
Phone: (408) 918-4770 / (800) 675-1155 Fax: (408) 298-6356 www.sccgov.org/portal/site/vector
94 Item # C5.
Stormwater Management Plan ARCO Milpitas
Stormwater BMP Inspection Report
The property owner will prepare and submit, for review by the City of Milpitas, these Stormwater documents to the City of Milpitas annually. The property accepts responsibility for maintenance of stormwater management facilities until such responsibility is transferred to another entity.
Stormwater Treatment Measure Information:
The property contains two bioretention areas, located as described below and as shown on the attached site plan. Bioretention Area IMP 1 is located at the corner of S. Park Victoria Drive and Landess Avenue. Bioretention Area IMP 2 is located at the southwest corner of the site.
Stormwater BMP Inspection and Maintenance Log
Property Name
Address
Begin Date End Date
Date BMP
ID#
BMP Description Inspected
by:
Cause for
Inspection
Exceptions Noted Comments and
Actions Taken
Sediment Removal:
Total amount of accumulated sediment removed from the stormwater treatment measures during the reporting period :
______cubic yards.
How was the sediment disposed?
landfill
other, explain _______________________
Instructions: Record all inspections and maintenance for all treatment BMPs on this form. Use additional log sheets and/or attach extended comments or documentation as necessary. Submit a copy of the completed log, with the individual inspection and maintenance checklists and the annual independent inspectors report to the municipality, and start a new log at that time. BMP ID# Always use ID# from the Operation and Maintenance Manual. Inspected by Note all inspections and maintenance on this form, including the required independent annual inspection.
Cause for inspection Note if the inspection is routine, pre-rainy-season, post-storm, annual, or in response to a noted problem or complaint.
Exceptions noted Note any condition that requires correction or indicates a need for maintenance.
Comments and actions taken Describe any maintenance done and need for follow-up. 95 Item # C5.
Stormwater Management Plan ARCO Milpitas
Designation of Individuals Responsible for
Stormwater Treatment BMP Operation and Maintenance
Date Completed
Facility Name
Facility Address
Designated Contact for Operation and Maintenance
Name: Title or Position:
Telephone: Alternate Telephone:
Email:
Off-Hours or Emergency Contact
Name: Title or Position:
Telephone: Alternate Telephone:
Email:
Corporate Officer (authorized to execute contracts with the City, Town, or County) Name: Title or Position:
Address:
Telephone: Alternate Telephone:
Email:
Record individual inspections and maintenance for all treatment BMPs on the inspection and maintenance checklist on the next page.
96 Item # C5.
Stormwater Management Plan ARCO Milpitas
Annual Summary of Stormwater BMP Inspection and Maintenance Log Identifying Number
of Source and
Treatment Control
Date of
Inspection
Operation & Maintenance
Activities Performed and Date(s)
Conducted
Additional
Comments
Certification:
I hereby certify, under the penalty of perjury, that the information presented in this report and attachments is true and complete:
Date:
Signature of Property Owner or Other Responsible Party
Print Name
Company Name
Address
Phone Number: Email:
97 Item # C5.
Stormwater Management Plan ARCO Milpitas
Submittal
Please submit the Operations and Maintenance Inspection reports, Maintenance, Plan, and Inspection and Maintenance checklist for each BMP to the following address:
City of Milpitas
455 E. Calaveras Blvd.
Milpitas, CA 95035
Attn: Land Developer Engineer
98 Item # C5.
Stormwater Management Plan ARCO Milpitas
APPENDIX H
Geotechnical Engineering
Services Report
99 Item # C5.
100
Item # C5.
GEOTECHNICAL ENGINEERING
SERVICES REPORT
For the
PROPOSED AM/PM
FUELING STATION REMODEL
1575 Landess Avenue,
Milpitas, California
Prepared for
BP Products North America, Inc.
150 W. Warrenville Road
Building 605, 3rd Floor
Naperville, Illinois 60563
Prepared by
Professional Service Industries, Inc.
4703 Tidewater Avenue, Suite B
Oakland, California 94601
Telephone (510) 434-9200
PSI PROJECT NO. 575-1284
December 13, 2017
101
Item # C5.
int<?rt<?k
-
IP-sil
Total
Quality
.
Assured.
December 13,2017
Ms.
Michelle Knapp
BP Products North America, Inc. (BP)
150 W. Warrenville Road, Bldg. 605, 3rd Floor
Naperville, Illinois 60563
Subject: Geotechnical Engineering Services_ Report
Proposed AM/PM Fueling Station Remodel
1575 Landess Avenue, Milpitas, California
PSI
Project
No.
575-1284
Dear
Ms.
Knapp:
4703 Tidewater Avenue,
Suite
B
Oakland, CA 94601
phone: 510.434.9200
fax:
51 0.434. 7676
intertek.com/building
psiusa.com
Professional Service Industries, Inc. (PSI), an lntertek company, is pleased to submit our Geotechnical Engineering Services Report for the above-referenced project in Milpitas, California. This report includes the results of field and laboratory testing and geotechnical recommendations for foundation, as well as general site development.
We appreciate the opportunity to perform this Geotechnical Study and look forward to continued participation during the design and construction phases of this project. If you have any questions pertaining to this report, or if we may be of further service, please contact our office.
Respectfully submitted,
Reviewed by Michael Place, Principal Consultant
102
Item # C5.
TABLE OF CONTENTS
1.0 PROJECT INFORMATION .............................................................................................................................. 1
1.1 PROJECT AUTHORIZATION ................................................................................................................................ 1
1.2 SITE LOCATION AND DESCRIPTION ................................................................................................................... 1
1.3 PROJECT UNDERSTANDING .............................................................................................................................. 1
1.4 PURPOSE AND SCOPE OF SERVICES ................................................................................................................ 2
2.0 SUBSURFACE EXPLORATION ..................................................................................................................... 3
2.1 SITE GEOLOGY .................................................................................................................................................. 3
2.2 PRE-FIELD ACTIVITIES ...................................................................................................................................... 3
2.3 SUBSURFACE EXPLORATION AND CONDITIONS ............................................................................................... 3
2.3.1 Standard Penetration Test (SPT) Borings ............................................................................................. 3
2.3.2 Soil Description ..................................................................................................................................... 4
2.3.3 General Boring Notes ............................................................................................................................ 4
2.4 GROUNDWATER ................................................................................................................................................ 4
2.5 INFILTRATION RATE EVALUATION ..................................................................................................................... 5
2.6 LABORATORY EVALUATION ............................................................................................................................... 5
3.0 SEISMIC CONSIDERATIONS ......................................................................................................................... 6
3.1 REGIONAL SEISMICITY ...................................................................................................................................... 6
3.2 SEISMIC ANALYSIS ............................................................................................................................................ 6
3.3 HAZARD ASSESSMENT ...................................................................................................................................... 7
4.0 GEOTECHNICAL RECOMMENDATIONS .................................................................................................... 9
4.1 GENERAL ........................................................................................................................................................... 9
4.2 SITE PREPARATION ........................................................................................................................................... 9
4.3 ENGINEERED FILL ........................................................................................................................................... 10
4.4 EXCAVATIONS .................................................................................................................................................. 11
4.4.1 Excavations/Slopes .............................................................................................................................. 11
4.4.2 Utility Trench Excavation and Backf ill ................................................................................................ 11
4.5 FOUNDATIONS ................................................................................................................................................. 12
4.5.1 Shallow Building Foundations ............................................................................................................ 12
4.5.2 Canopy Foundations ............................................................................................................................ 13
4.6 CONCRETE FLOOR SLAB ................................................................................................................................ 15
4.7 DRAINAGE CONSIDERATIONS ......................................................................................................................... 16
4.8 PAVEMENT RECOMMENDATIONS .................................................................................................................... 16
4.8.1 General Pavement Notes ..................................................................................................................... 17
4.9 CORROSIVITY .................................................................................................................................................. 18
4.10 CONSTRUCTION MONITORING ...................................................................................................................... 18
5.0 GENERAL ......................................................................................................................................................... 19
5.1 USE OF REPORT .............................................................................................................................................. 19
5.2 LIMITATIONS .................................................................................................................................................... 19
6.0 REFERENCES ................................................................................................................................................. 20
FIGURES
Figure 1: Site Location Map
Figure 2: Site Plan and Boring Location Map
APPENDIXES
Appendix A Exploration Logs and Drilling Permit
Appendix B Laboratory Test Results
Appendix C Liquefaction Analysis
103
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
1.0 PROJECT INFORMATION
1.1 Project Authorization
Professional Service Industries, Inc. (PSI) is pleased to submit our Geotechnical Engineering Services Report for the proposed AM/PM Fueling Station remodel in Milpitas, California. Our work was performed in general accordance with the BP Geotech Services Scope of Work dated March 1, 2017. Our work was authorized by Ms. Michelle Knapp of BP by issuing a Purchase Order (PO#4532530202, dated October 24, 2017) in response to our geotechnical pricing proposal.
1.2 Site Location and Description
The subject site is a trapezoidal-shaped property measuring about ½ acre in plan area. The site is located at the northwest corner of the intersection of South Park Victoria Drive and Landess Avenue, with a street address of 1575 Landess Avenue in Milpitas, California (see Figure 1 - Site Location Map).
The property is bounded to the north and west by commercial properties, to the south by Landess Avenue followed by commercial properties and to the east by South Park Victoria Drive followed by a commercial property. At the time of our fieldwork, the site was developed with an existing ARCO filling station and AM/PM mini-mart, fuel pumps, a fueling canopy, and paved parking and drive areas (see Figure 2). Based on topographic information obtained from Google Earth, the site is relatively level with elevations ranging from approximately 101 to 106 feet above mean sea level.
1.3 Project Understanding
Based on the scaled Site Plan provided by your office (PM Design, 2017), PSI understands that the existing gas station/mini-mart building is to be demolished and it is proposed to construct a new ARCO station/AM/PM mini-mart as a replacement. We understand from information provided that the new building will consist of a 1-story, 3,180 square foot building, to be located to the northwest of the existing structure. We have assumed that the existing underground storage tanks and canopy will be re-used and that new canopies or USTs will not be needed.
Expected structural loading was not made available at the time this report was prepared, but based on the type of development planned and on our previous experience with similar projects PSI anticipates strip and column footing loads on the order of 3 kips and 30 kips respectively.
Other improvements are likely to include pavements and utilities. Also, for the purposes of this report, we have assumed finish exterior grades to be near (+/- two feet) existing grades. A site plan with the locations of the proposed structures is presented as Figure 2.
Should any of the above information or assumptions made by PSI be inconsistent with the planned construction, we request that you contact us immediately to allow us to make any necessary modifications to our recommendations.
104
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
1.4 Purpose and Scope of Services
The purpose of our geotechnical evaluation was to assess the subsurface soil conditions at the site in order to provide appropriate recommendations for site preparation and foundation design.
Our evaluation was in general accordance with the scope of work outlined in the BP Geotech Services Scope of Work dated March 1, 2017.
Our scope of services included 2 Standard Penetration Test (SPT) borings, drilled to depths of up to approximately 21½ to 51½ feet below the existing surface grade (bgs) in the area of the proposed new structure. This report briefly outlines the testing procedures, presents available project information, describes the site and subsurface conditions, and presents geotechnical recommendations regarding the following:
Site topographic information and surface conditions;
Review of subsurface conditions including groundwater; Review of field and laboratory test procedures and test data; Information on potentially expansive, deleterious, chemically active or corrosive materials; Figures including a site plan with boring locations and boring logs; California Building Code (CBC) site class and seismic site coefficients for use in seismic design (CBSC, 2016);
An assessment of the potential for soil liquefaction during a seismic event; Site preparation and grading considerations, including recommended fill material characteristics and compaction requirements for general site fill and slab/pavement subgrades, including an assessment as to the suitability of on-site soils for use as fill; Recommendations pertaining to design and construction of foundations, floor slabs and pavements, including allowable soil bearing pressures, anticipated bearing depths and estimated settlements; and,
Comments regarding factors that may impact construction and performance of the proposed construction.
The scope of services did not include an environmental assessment for determining the presence or absence of wetlands or hazardous or toxic materials in the soil, bedrock, surface water, groundwater, or air on or below, or around this site. Any statements in this report or on the boring logs regarding odors, colors, and unusual or suspicious items or conditions are strictly for information purposes only.
105
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
2.0 SUBSURFACE EXPLORATION
2.1 Site Geology
The subject site is located within a large region known as the Coast Ranges geomorphic province. This province is characterized by extensively folded, faulted, and fractured earth materials. These structural features trend in a northwesterly direction and make up the prominent system of northwest-trending mountain ranges separated by straight-sided sediment filled valleys (CGS, 2002).
The subject site is situated on the alluvial plains near the northern end of the Santa Clara Valley, approximately 4½ miles southeast of the San Francisco Bay. Our review of readily available, pertinent geologic literature (Dibblee, 1973) indicates that the subject site is underlain by late Quaternary aged alluvium (Qa), described as gravel sand and clay.
2.2 Pre-Field Activities
Prior to initiation of field drilling activities, PSI outlined the site and marked the proposed boring locations in white paint, and contacted Underground Service Alert (USA) a minimum of 48 hours prior to beginning work to locate any potential buried utilities. The USA inquiry identification number (or Ticket Number) for the utility locate request was #W729901352-00W. Additionally, PSI hired Subdynamic Locating Services, a subcontract private utility location service, to check the proposed boring locations for underground utilities.
2.3 Subsurface Exploration and Conditions
In order to evaluate soil conditions at the site, PSI advanced 2 Standard Penetration Test (SPT) soil borings within the new building area to depths of about 21½ to 51½ feet below existing grade bgs. Locations of the soil borings, as well as the existing and proposed improvements, are shown on Figure 2.
2.3.1 Standard Penetration Test (SPT) Borings
The SPT borings were drilled by HEW Drilling of East Palo Alto, California with a CME 75 drill rig using hollow-stem auger drilling methods. Boring B-1 and B-2 were advanced in the proposed new building area to depths of approximately 21½ to 51½ feet below the existing ground surface (bgs). At the completion of drilling, the borings were backfilled with soil cuttings and topped with concrete to match the existing surface grades.
During the sampling procedure, Standard Penetration Tests (SPT) were performed in accordance with ASTM D1586 and relatively undisturbed samples were obtained in general accordance with ASTM D3550. The SPT for soil borings were performed by driving a 2-inch diameter split-spoon sampler into the undisturbed subsurface materials located at the bottom of the advanced borehole with repeated blows of a 140-pound hammer falling a vertical distance of 30 inches. The number of blows required to drive the sampler the last 12 inches of an 18-inch penetration depth is a measure of the soil consistency. For ASTM D3550 (California Modified Sampler) the split barrel sampler possesses a 3-inch outside diameter and is driven in the same 106
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
manner as the SPT. The field blow counts obtained from the California Modified sampler, as indicated in the boring logs, are multiplied by a factor of 0.65 to obtain an approximate correlation to SPT blow counts (SPT-N value). Samples were identified in the field, placed in sealed containers, and transported to the laboratory for further classification and testing.
2.3.2 Soil Description
In the new building area (borings B-1 and B-2), the site was surfaced with about 2 to 3 inches of asphalt underlain by about 3 to 4 inches of aggregate base. Beneath the pavement, the subsurface soil encountered at the boring locations generally consisted of stiff to hard consistency sandy lean clay that extended to a depth of about 40 feet below grade. The sandy lean clay soil was underlain by medium dense clayey sand and very dense poorly graded sand with gravel that extended to the maximum depth explored.
2.3.3 General Boring Notes
The above subsurface information is of a generalized nature to highlight the major subsurface stratification features and material characteristics. The boring logs, included in Appendix A, should be reviewed for specific information at the boring locations. These records include soil descriptions, stratification, penetration resistance, locations of the samples and laboratory test data. The stratification shown on the logs represent the conditions only at the actual location at the time of our exploration. Variations may occur and should be expected between boring locations. The stratification that represents the approximate boundary between subsurface materials and the actual transition may be gradual. It should be noted that, although the test borings are drilled and sampled by experienced professionals, it is sometimes difficult to record changes in stratification within narrow limits, especially at great depths. In the absence of foreign substances, it is also sometimes difficult to distinguish between discolored soils and clean fill soil.
The pavement thicknesses shown on the boring logs are approximate measurements and represent the conditions only at the actual boring locations at the time of our exploration.
Variations may occur and should be expected between boring locations. Additionally, Petromat- type fabric in the pavement section is difficult to discern during drilling and may or may not be present in the existing pavements. As such, the pavement description given in this report is not intended to be used to evaluate the suitability or estimate the quantity for disposal.
2.4 Groundwater
Groundwater was encountered at a depth of approximately 45 feet below grade in boring B-1 at the time of drilling. Groundwater was not encountered within the other exploration either during or upon completion of drilling. Based on a review of the Seismic Hazard Zone Report for the Calaveras Reservoir Quadrangle (CDMG, 2001) we estimate that the historic high groundwater at the site is about 33 feet below grade. As such, groundwater is not expected to impact the proposed construction. It is possible, however, that transient, saturated ground conditions at shallower depths could develop at a later time during periods of heavy precipitation, landscape watering, leaking water lines, or other unforeseen causes. Variations in groundwater levels should be expected seasonally, annually, and from location to location. 107
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
2.5 Infiltration Rate Evaluation
One infiltration test boring (I-1) was advanced to a depth of about 5 feet bgs in the approximate location indicated on the provided boring location plan (PM Design, 2017). The infiltration boring was advanced to evaluate the feasibility of a proposed bioretention feature. The test depth was selected based on the expected depth of the bioretention feature. The approximate location of the infiltration test boring is indicated on Figure 2.
Once advanced to the test depth, the bottom of the boring was filled with approximately 6 inches of Cemex Lapis Lustre #3 sand. A 5-foot section of perforated PVC piping (slotted well casing) with an inside diameter of approximately 4 inches was installed inside the boring on top of the gravel, with solid piping above, extending upward to the ground surface. Approximately 5 feet of the #3 sand was placed within the annular space around the pipe. The pipe was then filled with a minimum of 5 feet of clean water above the soil to be tested (bottom of the hole) and maintained at a minimum depth of 5 feet for 4 hours to presoak the native soil material.
Following the presoak of the test hole, an infiltration test was performed by filling the pipe with about 3 feet of water and recording the drop in the water level within the pipe at approximate 15- minute intervals for 1 hour. The water level was measured to the nearest 0.01 foot (approximately ⅛ inch) with a flat tape water level meter using the top of the pipe as a reference point. After 1 hour, the process was repeated 2 additional times. The total running time for all three trials was approximately 3 hours. The results of our tests are as follows:
I-1 (5 feet bgs) Test Results –
An un-factored end of test percolation rate of approximately 0.3 gallons per square foot per day, which is approximately equivalent to 0.02 inches per hour, was obtained.
PSI recommends that a factor of safety of at least 2 be utilized in the design of the any infiltration facility. Local regulatory agencies may also require additional safety factors be applied to the measured infiltration rate and PSI recommends that design rates be determine in general accordance with local requirements.
2.6 Laboratory Evaluation
Selected samples of the subsurface soils encountered were returned to our laboratory for further evaluation to aid in classification of the materials, and to help assess their strength and expansive nature. The laboratory evaluation consisted of visual and textural examinations, moisture and density tests, Atterberg Limit tests, expansion index testing and sieve analysis (percent passing the No. 200 sieve). Sulfate, chloride, pH and resistivity testing were also performed to evaluate the corrosive potential of the site soils. A brief discussion of the laboratory tests performed and a portion of the test results are presented in Appendix B. The remaining test results are shown on the boring logs in Appendix A. Samples that were not altered by laboratory testing will be retained for 30 days from the date of this report and will then be discarded.
108
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
3.0 SEISMIC CONSIDERATIONS
3.1 Regional Seismicity
Generally, seismicity within California can be attributed to faulting due to regional tectonic movement. This includes the Hayward Fault, the Calaveras Fault, and most parallel and subparallel faulting within the State. The portion of California which includes the subject site is considered seismically active. Seismic hazards within the site can be attributed to potential groundshaking resulting from earthquake events along nearby or more distant faulting.
According to regional geologic literature (Blake, 2000; USGS, 2016), the closest known late Quaternary fault is the Hayward Fault, located approximately 1 mile northeast of the site. The CDMG Special Studies Zones map (CDMG, 1982) indicates that a mapped trace of the Hayward Fault lies about 0.9 miles northeast of the site. Several potentially active and pre- Quaternary faults also occur within the regional vicinity. The site is subject to a Maximum Magnitude Event of 7.3 Magnitude along the Hayward Fault. The Maximum Magnitude Event is defined as the maximum earthquake that appears capable of occurring under the presently known tectonic framework.
3.2 Seismic Analysis
According to the Alquist-Priolo Special Studies Zones Act of 1972 (revised 1994), active faults are those that have been shown to display surface rupture during the last 11,000 years (i.e., Holocene time). PSI did not observe any mapped faults crossing the site on readily available resources (Dibblee, 1973; USGS, 2016).
The site will be affected by seismic shaking as a result of earthquakes on major active faults located throughout the northern California area. As part of the current, 2016 California Building Code (CBC), the design of structures must consider dynamic forces resulting from seismic events. These forces are dependent upon the magnitude of the earthquake event as well as the properties of the soils that underlie the site. As part of the procedure to evaluate seismic forces, the code requires the evaluation of the Seismic Site Class, which categorizes the site based upon the characteristics of the subsurface profile within the upper 100 feet of the ground surface.
To define the Site Class for this project, we interpreted the results of our soil test borings drilled within the project site and estimated appropriate soil properties below the base of the borings to a depth of 100 feet. The estimated soil properties were based upon data available in published geologic reports as well as our experience with subsurface conditions in the general site area.
Based upon this, the subsurface conditions within the site are consistent within the characteristics of Site Class D (stiff soil profile).
109
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
In accordance with the 2016 California Building Code (CBSC), the USGS probabilistic ground acceleration values (ASCE 7 Chapter 20, 2010) for latitude 37.4163° and longitude -121.8755° obtained from the USGS Seismic Design Maps web page (USGS, 2017) are presented in the following table;
Ground Motion Values*
Period
(sec)
Mapped MCE
Spectral
Response
Acceleration**(g)
Site
Coefficients
Adjusted MCE
Spectral
Response
Acceleration (g)
Design Spectral
Response
Acceleration (g)
0.2 Ss 1.807 Fa 1.0 SMs 1.807 SDs 1.205
1.0 S1 0.722 Fv 1.5 SM1 1.083 SD1 0.722
*2% Probability of Exceedance in 50 years
**At B-C interface (i.e. top of bedrock)
MCE = Maximum Considered Earthquake
The Site Coefficients, Fa and Fv presented in the above table were also obtained from the noted USGS webpage, as a function of the site classification and mapped spectral response acceleration at the short (Ss) and 1-second (S1) periods, but can also be interpolated from CBC Tables 1613.3.3(1) and 1613.3.3(2). Based on the above values, a Seismic Design Category D is considered appropriate for the site.
3.3 Hazard Assessment
Lurching and Shallow Ground Rupture Evidence of active fault rupture was not observed within the explored areas of the site at the time of our subsurface exploration and as noted above, PSI did not observe any mapped faults crossing the site in readily available resources. As such, the potential for ground rupture from faulting at the site is considered to be low.
Liquefaction Soil liquefaction and seismically-induced settlement typically occur in saturated cohesionless soils; and in clays and plastic silts with low plasticity indexes with moisture contents near their liquid limits, due to cyclic softening where the groundwater is relatively shallow (within 50 feet of the ground surface). During an earthquake, ground shaking causes a rapid increase in the porewater pressure within the soil mass under undrained conditions. The generation of excess porewater pressures causes a corresponding decrease in the soils effective stress, which can result in a sudden loss of soil bearing strength and ground surface settlement within the liquefied (and softened) soil layers. Soil liquefaction potential is generally affected by soil types, mineral contents, ground acceleration, duration of shaking, and frequency content of the earthquake ground motion, among other factors.
The Seismic Hazard Zones map for the Calaveras Reservoir Quadrangle (CDMG, 2001) indicates that the site is not located within a designated liquefaction hazard zone. However, a designated liquefaction hazard zone is located in close proximity to the site. Based on this setting, a detailed liquefaction analysis was performed to assess the liquefaction potential of the site soils. To evaluate the liquefaction potential, the computer software program, LiquefyPro (CivilTech, 2007) was utilized. A ground acceleration (PGAM) of 0.697g and an earthquake 110
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
magnitude (Mw) of 6.63, both obtained from the USGS website, were incorporated into the analysis. The soil profile identified within Boring B-1 and a groundwater depth of 33 feet (historic high) were also used.
As noted in SP 117A, low plastic silts and clays are potentially susceptible to soil liquefaction only if their plasticity indices are less than 12 and the ratio of their in-situ moisture contents relative to the soils liquid limit is greater than 85%. To assess the liquefaction susceptibility of the site clay soils, laboratory testing was performed and is summarized in the table below.
Sample Moisture
Content (w)
Liquid Limit
(LL)
Plasticity
Index (PI)
w/LL Potentially
Susceptible
B-1 @ 25 feet 9% 32 16 28% No
B-1 @ 35 feet 8% 33 17 24% No
The results of this analysis indicate that the clayey sand soil layer between about 40 to 45 feet below grade is potentially susceptible to soil liquefaction upon application of the design earthquake. The analysis also indicates that a total seismic-induced settlement of about 0.6 inches is possible with an estimated differential settlement of about 0.4 inch over a 40-foot horizontal span. It is our opinion that the magnitudes of estimated total and differential seismic settlement are within tolerable limits and ground modification or other remedial measures are not needed. A copy of the liquefaction analysis is included within Appendix C.
Secondary Liquefaction Effects Based on the relative thickness of the overlaying non- liquefiable soils relative to the thickness of the potentially liquefiable soil, it is our opinion that the potential for surface manifestations (sand boils, loss of bearing, etc.) are very low (Ichihara, 1985). Due to the absence of any nearby channels/free-faces, the limited thickness of the liquefiable soils and the lack of soil with N-values less than 15, the potential for lateral spreading is considered to be nil.
Landsliding and Slope Stability Seismically induced landsliding is not considered a hazard on, or adjacent to the project site due to the absence of significant steep slopes in or around the project area.
111
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
4.0 GEOTECHNICAL RECOMMENDATIONS
4.1 General
Soil deposits, generally consisting of very stiff to hard lean clay underlain by medium dense clayey sand and very dense gravelly sands were encountered at the site. Based on the results of our field exploration, the near surface soils appear to be suitable for foundation support provided the recommendations in this report are followed. PSI recommends that the proposed structure be supported by conventional continuous strip footings or isolated spread footings bearing on existing soils compacted to a firm and unyielding state and/or properly compacted Engineered Fill, as recommended in the Site Preparation section of this report.
The proposed construction at the site should be performed in accordance with the following recommendations, the current edition of the California Building Code, and local governmental standards which have jurisdiction over this project. Our recommendations have been developed on the basis of the described project characteristics and subsurface conditions encountered. If there are any changes in these project criteria, including project location on the site, a review should be made by PSI to determine if modifications to the recommendations are warranted.
Once final design plans and specifications are available, a general review by PSI is recommended to check that the evaluations made in preparation of this report are correct and that earthwork and foundation recommendations are properly interpreted and implemented.
4.2 Site Preparation
Initial site preparation should include demolition of the existing building and any other improvement which is not to remain. Removal of the existing structure should include removal of the foundations, floor slab and any other below-grade component. Pavements which are not planned for re-use should also be removed. Existing utilities that are in conflict with the new construction should be removed or re-routed as needed. All debris resulting from the stripping and demolition operations should be legally disposed off-site. Soils disturbed by the demolition of the existing improvements should be removed to undisturbed soil and be stockpiled for future use.
All grading operations should be performed in accordance with our recommendations, the requirements of the current edition of the CBC, and local governmental standards which have jurisdiction over this project.
Following demolition, removal of soils disturbed by the demolition and clearing operations and lowering of grades as needed, we recommend that the building and areas to support new improvements should be proof rolled with a heavy rubber tired piece of construction equipment approved by and in the presence of the Geotechnical Engineer. Any soil that is observed to excessively yield or deflect during the proof rolling operation should be removed to a suitable subgrade as determined by the Geotechnical Engineer.
112
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
It is recommended that the exposed subgrade soil, within all areas to receive Engineered Fill or to support surface improvements (new foundation members, slabs and pavements) be scarified to a depth of about 12 inches, be moisture conditioned to about 2 percent above or below the soils optimum moisture content and compacted to a minimum of 90 percent relative compaction (based on ASTM D1557). This earthwork should extend a minimum 5 feet beyond the proposed improvement areas, where feasible.
4.3 Engineered Fill
Engineered Fill material required at this site should not contain rocks greater than 3-inches in diameter or greater than 30 percent retained on the ¾-inch sieve, and should not contain more than 3 percent (by weight) of organic matter or other unsuitable material. The Expansion Index (EI) for the material should not exceed 50. Based on our subsurface investigation, existing on- site soils are generally suitable for use as Engineered Fill, however, this should be confirmed by a PSI representative during grading. Import materials meeting the above requirements should be approved by the Geotechnical Engineer prior to use as Engineered Fill.
Engineered Fill should be compacted to at least 90 percent of the maximum dry density as determined by the modified Proctor (ASTM D1557). The moisture content of Engineered Fill should be maintained at approximately 2 percent above or below the materials optimum moisture content as determined by the same index during compaction. If the Engineered Fill is too dry, water should be uniformly applied across the affected fill area. If the Engineered Fill is too wet, it must be dried. In either event, the Engineered Fill should be thoroughly mixed by disking to obtain relatively uniform moisture content throughout the lift immediately prior to compaction. The upper 12 inches of the pavement subgrade should be compacted to at least 95% of the soils maximum dry density.
Engineered Fill should be placed in maximum lifts of 8-inches of loose material. Each lift of Engineered Fill should be tested by a PSI soils technician, working under the direction of our Project Geotechnical Engineer, prior to placement of subsequent lifts.
Compaction of the backfill should be checked with a sufficient number of density tests by a representative of the Geotechnical Engineer to determine if adequate compaction is being achieved by the contractor. The properly compacted Engineered Fill should extend horizontally outward beyond the exterior perimeter of the foundations a distance equal to the height of fill or 5 feet, whichever is greater, prior to significant sloping. In addition, Engineered Fill should extend horizontally outward beyond the exterior perimeter of the pavements or footings a distance equal to the height of fill, at a minimum, prior to significant sloping. 113
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
4.4 Excavations
Excavation and construction operations for the foundations may expose the on-site soils to inclement weather conditions. The stability of exposed soils will rapidly deteriorate due to precipitation or the action of heavy or repeated construction traffic. Accordingly, foundation area excavations and pavement subgrade areas should be adequately protected from the elements, and from the action of repetitive or heavy construction loading.
4.4.1 Excavations/Slopes
Any permanent cut or fill slopes should not exceed 2 Horizontal to 1 Vertical (2H:1V).
Excavations extending below a 1H:1V plane extending down from any adjacent footings should be shored for safety. All excavations should be inspected by a representative of the geotechnical engineer during construction to allow any modifications to be made due to variation in the soil types. All work should be performed in accordance with Department of Labor Occupational Safety and Health Administration (OSHA) guidelines. Job site safety is the responsibility of the project contractor.
In Federal Register, Volume 54, No. 209 (October 1989), the United States Department of Labor, Occupational Safety and Health Administration (OSHA) amended its Construction Standards for Excavations, 29 CFR, part 1926, subpart P. This document was issued to better insure the safety of personnel entering trenches or excavations. It is mandated by this federal regulation that excavations, whether they be utility trenches, basement excavations, or footing excavations, be constructed in accordance with the new OSHA guidelines.
The contractor is solely responsible for designing and constructing stable, temporary excavations and should shore, slope, or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. The contractors responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractors safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal state regulations.
We are providing this information solely as a service to our client. PSI does not assume responsibility for construction site safety or the contractors or other parties compliance with local, state, and federal safety or other regulations.
4.4.2 Utility Trench Excavation and Backfill
Excavation excavations should be made in accordance with applicable Federal and State Occupational Safety and Health Administration regulations. Utility trenches at the site may need to be sloped or shored from the ground surface due to the potential for caving, dependent upon the depth of new utilities. Actual inclinations will ultimately depend on the soil conditions encountered during earthwork. While we may provide certain approaches for trench excavations, the contractor should be responsible for selecting the excavation technique, monitoring the trench excavations for safety, and providing shoring, as required, to protect personnel and adjacent improvements. The information provided below is for use by the owner 114
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
and engineer and should not be interpreted to mean that PSI is assuming responsibility for the contractors actions or site safety. The soils encountered in our subsurface explorations may be classified as Type B soil according to the most recent OSHA regulations and may be sloped, without shoring at no steeper than 1H:1V for temporary excavations. In our opinion, excavations should be safely sloped or shored. The contractor should be aware that excavation and shoring should conform to the requirements specified in the applicable local, state, and federal safety regulations, such as OSHA Health and Safety Standards for Excavations, 29 CFR Part 1926, or successor regulations. We understand that such regulations are being strictly enforced, and if not followed, the contractor may be liable for substantial penalties.
Excavation and construction operations may expose the on-site soils to inclement weather conditions. The stability of exposed soils may deteriorate due to a change in moisture content or the action of heavy or repeated construction traffic. Accordingly, foundation and pavement area excavations should be protected from the elements and from the action of repetitive or heavy construction loadings.
Utility trenches below the slab, footings and pavement areas should be backfilled with engineered fill.
4.5 Foundations
4.5.1 Shallow Building Foundations
Following demolition and site preparation, as recommended in Section 4.2, it is our opinion that conventional continuous and isolated spread footings are suitable for the support of the proposed structure. All footings should be supported by suitable bearing existing soils and/or by properly compacted Engineered Fill. Continuous footings should be founded at least 18 inches below lowest adjacent finished grade and have a minimum width of 18 inches. Isolated spread footings should be at least 24 inches wide and supported at a depth of 18 inches below the lowest adjacent grade. Footings with the above recommended minimum dimensions and with subgrade prepared in accordance with section 4.2 of this report may be designed for an allowable bearing pressure of 3,000 pounds per square foot (psf). The allowable soil bearing pressure may be increased by one-third for loads of short duration, including wind and seismic forces. Appropriate foundation reinforcement should be provided in accordance with the Structural Engineers design.
Horizontal loads acting on shallow foundations are resisted by friction along the foundation base and by passive pressure against the footing face, which is perpendicular to the line of applied force. The coefficient of friction between the base of the footing and the subgrade soils may be assumed to be 0.30. A passive soil resistance equal to a uniform pressure of 250 psf may be used for compacted soil or firm native soil against the face of the footing (assuming a level ground surface).
The foundation excavations should be observed by a representative of PSI prior to steel or concrete placement to assess that the foundation materials are capable of supporting the design loads and are consistent with the materials discussed in this report. Soft or loose soil 115
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
zones encountered at the bottom of the foundation excavations should be removed and replaced with Engineered Fill or recompacted in-place, as recommended by the geotechnical engineer.
After opening, foundation excavations should be observed and concrete placed as quickly as possible to avoid exposure of the foundation bottoms to wetting and drying. Surface run-off water should be drained away from the excavations and not be allowed to pond. If possible, the foundation concrete should be placed during the same day the excavation is made. If it is required that foundation excavations be left open for more than one day, they should be protected to reduce evaporation or entry of moisture.
We estimate that foundations designed constructed in accordance with the above recommendations will experience a total static settlement of less than 1-inch with a differential settlement of less than ½-inch over a 40-foot span within the building area. While settlement of this magnitude is generally considered tolerable for structures of the type proposed, the design of masonry walls should include provisions for liberally spaced, vertical control joints to minimize the effects of cosmetic cracking.
4.5.2 Canopy Foundations
It is PSIs opinion that any new canopy may be supported by shallow foundations or drilled piers.
Shallow canopy foundation elements should be founded on suitable in-situ soils, compacted to a firm and unyielding state (as determined by PSI) or Engineered Fill and may also be dimensioned based on an allowable soil bearing pressure of 3,000 psf, provided they are embedded at least 2 feet below existing and finish site grades. This recommended allowable soil bearing pressure may be increased by ⅓ for temporary seismic or wind loading.
If drilled piers are to be utilized for canopy foundation elements they should consist of an augured shaft having typical diameters of approximately 12 to 60 inches in diameter. They are drilled to a design depth and filled with reinforced concrete. Design parameters related to drilled pier foundations have been prepared based on the field explorations, further observation of the selected bulk samples in the laboratory, published references, and engineering judgment. In general, the design parameters were developed from the observed material type and the SPT data collected.
Piers installed in accordance with the recommendations stated above are calculated to provide an allowable capacity are shown in the table below. Piers should be a minimum of 5 feet deep and skin friction within the upper 2 feet should be neglected. PSI will need observe the subgrade conditions prior to rebar and concrete placement for the piers. Pier calculations were made using Terzaghi and Peck (1967) for cohesive soils, incorporating a factor of safety of 3.0 for end bearing capacity and 2.5 for skin friction.
116
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
Unit Design Values for Drilled Piers
Layer From
(feet)
To
(feet)
A
llowable Skin Friction
(ksf)
Allowable Bearing Capacity
(ksf)
1 0 2 - -
2 2 5 0.7 -
3 5 10 0.7 6
4 10 20 0.7 10
PSI recommends that the drilling contractor review the field exploration logs of this report before starting excavations for the drilled piers. Though not anticipated, if groundwater or sloughing soils are encountered, it should be expected that the advancement of casing and placement of concrete will be more difficult and special measures will be required to prevent caving. A representative of the Geotechnical Engineer should be on site to observe and document the installation of the deep foundation system.
When the drilling processes are completed for the pier, the reinforcing steel and the concrete should be placed immediately after the final cleanout pass is conducted on the base. The tremie method of concrete placement should be adopted when placing concrete below the groundwater table to prevent segregation of the concrete materials. If concrete is placed by the free-fall method into a dry excavation, it should be placed to avoid contact with the excavation sidewalls to prevent segregation. During simultaneous concrete placement and casing removal operations, sufficient concrete should be maintained inside the casing to offset the hydrostatic head of the ground water outside the casing and minimize the intrusion of soil into the concrete.
Concrete placed in the pier excavations should have a slump in the range of 7 to 9 inches to reduce the potential for the formation of voids as the temporary pier casing is extracted. The concrete mix should be designed to attain the required 28-day design strength when placed at this slump. PSI should be retained to observe and document the drilled pier construction and to evaluate whether the subsurface and pier bearing conditions are as anticipated in this report.
The contractor should submit their procedures for drilled pier installation to the Geotechnical Engineer for approval prior to the start of the drilled pier construction.
We estimate that the shallow foundations or piers will experience less than 1 inch of immediate, post-construction settlement within the area of the structures supported on pipe piers, with less than ½ inch of differential settlement between piers with a lateral surface distance of 40 feet apart from each other.
117
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
4.6 Concrete Floor Slab
Concrete slab-on-grade floors can be supported on properly compacted existing soil and/or Engineered Fill after site preparation and fill placement procedures, as described in previous sections of this report, are complete.
The slab section may be designed by the structural engineer using a modulus of subgrade reaction of 125 pounds per square inch per inch and assuming a low expansion potential, based on values typically obtained from 1-foot by 1-foot plate load tests. However, depending on how the slab load is applied, the value may need to be geometrically modified. The value should be adjusted for larger areas using the following expression for cohesive and cohesionless soil:
Modulus of Subgrade Reaction, ks = for cohesive soil; and, ks = k *( )2 for cohesionless soil
where: ks = coefficient of vertical subgrade reaction for loaded area; k = coefficient of vertical subgrade reaction for a 1 by 1 square foot area; and, B = width of area loaded, in feet.
Based on geotechnical considerations, it is recommended that the interior slabs be at least 4 inches in thickness, and reinforced in accordance with the Structural Engineers requirements. Care should be taken by the contractor to ensure that the reinforcement is placed and maintained at slab mid-height. Floor slabs should be suitably reinforced and jointed so that a small amount of independent movement can occur without causing damage.
Slabs should be underlain by capillary break material that is at least 4 inches thick, consisting of clean sand or gravel. In moisture-sensitive flooring areas or areas used to store moisture-sensitive materials, such as carpeted or linoleum covered areas, a 10-mil visqueen moisture retarder should be placed beneath the slab at mid-height within the capillary break material. The visqueen sheet should be sealed along the edges to prevent lateral migration of soil moisture from adjacent non- visqueen areas. Prior to placement of clean sand and slab-on-grade, the visqueen sheet should be thoroughly inspected for cracks, punctures, tears, and holes. If necessary, the visqueen should be replaced or patched to assure a fully functional entity.
Some minor cracking of slabs can be expected due to shrinkage. The potential for this slab cracking can be reduced by careful control of water/cement ratios in the concrete. The contractor should take appropriate curing precautions during the pouring of concrete in hot weather to reduce cracking of slabs. We recommend that a slipsheet (or equivalent) be utilized if grouted fill, tile, or other moisture-sensitive floor covering is planned directly on concrete slabs. All slabs should be designed in accordance with structural considerations. The floor slab should be liberally jointed in accordance with ACI guidelines to help control cracking, resulting from differential movement and concrete shrinkage.
B
B
2 1
118
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
Care should be taken that the grades slope away from the building and landscaping with irrigation is not placed adjacent to the building. Surface water should not be allowed to migrate under the building.
4.7 Drainage Considerations
Surface water must not be allowed to pond adjacent to the foundations. To preclude drainage problems, we recommend continuous roof gutters for the proposed structures. We recommend that roof drains be connected to a tight-line pipe leading to storm drain facilities. Pavement surfaces and open space areas should be sloped such that surface water runoff is collected and routed to suitable discharge points. We also recommend that ground surfaces adjacent to buildings be sloped to facilitate positive drainage away from the buildings. It should be noted that the subsurface (retaining wall) drainage and surface drainage systems must be kept separate.
A positive slope gradient of 2 percent down and away from the building perimeter should be applied to the finished subgrade (inclusive of topsoil). This slope should extend no less than 5 feet away from the outside building perimeter, with drainage swales provided to remove runoff from around the structure. Any utility trench that enters the perimeter of a structures should be excavated with a slight slope down and away from the perimeter of the structure.
Landscaped or planted areas should not be placed within 10 feet of the footings of the proposed structures. Where concrete flat work such as sidewalks are placed next to the structure, concrete should be placed adjacent to the foundation to prevent a planter strip that would trap surface water between the foundation and the sidewalk. For vegetation planted near the buildings, plants that require very little moisture should be used. Irrigation systems (drip and/or sprinkler heads) should not direct water where it could saturate foundation soil.
4.8 Pavement Recommendations
Preparation of the subgrade soils for new pavements should be prepared in general accordance with the site preparation recommendations (Section 4.2) including scarification and recompaction. While specific traffic loads and volumes for the project have not been provided, we are providing recommended light-duty and medium to heavy-duty pavement sections, which have been successfully utilized for this type of development in the project area with similar traffic loading.
119
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
For these preliminary pavement sections, we have assumed an R-value of 15 for the site subgrade soils and a Traffic Index of 4.5 and 6.5 for the light duty and heavy-duty sections, respectively. R-value testing should be performed on the actual pavement subgrade material at the time of site grading.
Light Duty (Automobile Parking; TI=4.5)
3 inches Asphalt Concrete (Caltrans Standard Specs. Section 39) over 7 inches Class II Aggregate Base (Caltrans Standard Specs. Section 26)
Heavy Duty (Entrance and Drive Lanes; TI=6.5)
3½ inches Asphalt Concrete (Caltrans Standard Specs. Section 39) 12½ inches Class II Aggregate Base (Caltrans Standard Specs. Section 26)
A rigid pavement section merits consideration for areas to receive relatively high concentrated sustained loads such as trash dumpster enclosures. For these areas, we recommend a minimum concrete thickness of 6 inches over 4 inches of compacted aggregate base. The concrete used for rigid pavement should have a minimum 28-day flexural strength of 600 psi and a maximum slump of 4 inches. The subgrade should be prepared as described in the Site Preparation section above. Pavement joints, reinforcing, and details should be designed in accordance with applicable American Concrete Institute (ACI) standards.
All aggregate base and the upper 12 inches of subgrade should be compacted to at least 95 percent of the maximum dry density as determined by ASTM Designation D1557 or to a firm and unyielding state as determined by PSI. All materials and methods of construction should conform to good engineering practices and be in conformance with the requirements of the local jurisdiction.
4.8.1 General Pavement Notes
The above recommended pavement sections represent minimum design thicknesses and, as such, periodic maintenance should be anticipated. Also, these recommended pavement sections should be confirmed or modified by your Civil Engineer, based on actual traffic and the owners requirements. The pavement section materials and construction should comply with the Caltrans Standard Specifications and local municipality requirements.
Where pavement areas are adjacent to heavily watered landscaping areas, we recommend some measure of moisture control be taken to prevent the subgrade soils from becoming saturated. It is recommended that the concrete curbing adjacent to the landscape areas extend into the prepared subgrade to reduce the potential for irrigation water to saturate subgrade soils.
Note that the pavement thicknesses shown on the boring logs are approximate measurements and represent the conditions only at the actual boring locations at the time of our exploration.
Variations may occur and should be expected between boring locations. Additionally, Petromat- type fabric in the pavement section is difficult to discern during drilling and may or may not be present in the existing pavements. As such, the pavement description given in this report is not intended to be used to estimate the quantity for disposal, if necessary. 120
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
4.9 Corrosivity
Testing was performed to evaluate the corrosivity of the on-site soils and the potential for attack on concrete and subsurface utility pipes, specifically cast iron and ductile iron. The testing included pH, sulfate, chloride and electrical resistivity. The results of the chemical analysis are as follows:
Boring
Number
Sample Depth
(feet)
pH Resistivity
(ohm-cm)
Water Soluble
Sulfates (ppm)
Water Soluble
Chlorides (ppm)
B-1 1 to 4 7.9 1,000 130 35.2
ppm = parts per million
Concrete mix designs should follow the minimum requirements of the California Building Code.
Laboratory testing of selected soil samples indicates that the on-site soils possess a negligible sulfate exposure, indicating a low degree of corrosivity with respect to concrete. Based on this result, it is our opinion that special sulfate-resistant concrete mix designs are not warranted and that the use of Type I or II cement is suitable for concrete in contact with on-site soils. Final concrete mix designs should be evaluated after sulfate tests have been performed on the actual subgrade material.
Corrosivity testing was also performed to determine whether the on-site soils have the potential to attack subsurface utility pipes, specifically cast iron and ductile iron. Based on the resistivity test results, the soils are characterized as being highly corrosive to cast iron or ductile iron piping (Roberge, 2000). PSI does not practice in the field of corrosion engineering. We recommend that a qualified corrosion engineer be consulted to determine if special corrosion protection is warranted for this site. Testing for corrosivity of any fill soils should be conducted during site grading to verify our recommendations.
4.10 Construction Monitoring
It is recommended that PSI be retained to examine and identify soil exposures created during project construction to document that soil conditions are as anticipated. We further recommend that any Engineered Fills be continuously observed and tested by our representative to evaluate the thoroughness and uniformity of their compaction. If possible, samples of fill materials should be submitted to our laboratory for evaluation prior to placement of fills on site. Costs for the recommended observations during construction are beyond the scope of this current consultation.
121
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
5.0 GENERAL
Our conclusions and recommendations described in this report are subject to the following general conditions:
5.1 Use of Report
This report is for the exclusive use of BP Products North America, Inc. and their representatives to use for the design of the proposed structure described herein and preparation of construction documents. The data, analyses, and recommendations may not be appropriate for other structures or purposes. We recommend that parties contemplating other structures or purposes contact us. In the absence of our written approval, we make no representation and assume no responsibility to other parties regarding this report.
After the plans and specifications are more complete, the geotechnical engineer should be retained and provided the opportunity to review the final design plans and specifications to check that our engineering recommendations have been properly incorporated into the design documents.
5.2 Limitations
The recommendations contained in this report are based on the available subsurface information obtained by PSI, and design details furnished for the proposed project. If there are any revisions to the plans for this project, or if deviations from the subsurface conditions noted in this report are encountered during construction, PSI should be notified immediately to determine if changes in the foundation recommendations are required. If PSI is not retained to perform these functions, PSI will not be responsible for the impact of those conditions on the project.
PSI did not provide any service to investigate or detect the presence of moisture, mold or other biological contaminants in or around any structure, or any service that was designed or intended to prevent or lower the risk of the occurrence of the amplification of the same. Client acknowledges that mold is ubiquitous to the environment with mold amplification occurring when building materials are impacted by moisture. Client further acknowledges that site conditions are outside of PSIs control, and that mold amplification will likely occur, or continue to occur, in the presence of moisture. As such, PSI cannot and shall not be held responsible for the occurrence or recurrence of mold amplification.
Services performed by PSI for this project have been conducted with that level of care and skill ordinarily exercised by members of the profession currently practicing in this area. No warranty, expressed or implied, is made.
122
Item # C5.
Proposed AM/PM Fueling Station Milpitas California
PSI Project No. 575-1284
December 13, 2017
6.0 REFERENCES
1. Blake, T.F., 1989-2000, Documentation for Eqfault Version 3.00b Update, Thomas F. Blake Computer Services and Software, Thousand Oaks, California.
2. California Division of Mines and Geology (CDMG), January 1, 1982, State of California Special Studies Zones, Calaveras Reservoir Quadrangle, Revised Official Map, Scale:
1:24,000.
3. CDMG, 2001, Seismic Hazard Zone Report for the Calaveras Reservoir 7.5-Minute Quadrangle, Santa Clara County, California, Seismic Hazard Zone Report 048.
4. CDMG, October 17, 2001, State of California Seismic Hazard Zones, Calaveras Reservoir Quadrangle, Official Map, Scale 1:24,000.
5. California Geological Survey (CGS), April, 2002, California Geomorphic Provinces http://www.consrv.ca.gov/cgs/information/publications/cgs_notes/note_36/note_36.pdf (web document).
6. CGS, 2008, Guidelines for Evaluating and Mitigating Seismic Hazards in California, Special Publication 117, 102 pp.
7. California Geological Survey (CGS), 2017, Search for Regulatory Maps, http://www.quake.ca.gov/gmaps/WH/regulatorymaps.htm.
8. California Building Standards Commission (CBSC), 2016 California Building Code (CBC), California Code of Regulations, Title 24, Part 2.
9. CivilTech Software, Feb. 2007, LiquefyPro, Liquefaction and Settlement Analysis Software.
10. Dibblee Jr., Thomas W., 1973, Preliminary Geologic Map of the Calaveras Reservoir Quadrangle, Alameda and Santa Clara Counties, California, USGS OFR 73-58.
11. Ishihara, K., 1985, "Stability of Natural Deposits during Earthquakes" Proceedings of the 11th International Conference on Soil Mechanics and Foundation Engineering, San Francisco, pp. 321-376.
12. PM Design Architectural Solutions Group, September 13, 2017, Site Plan Boring Locations, ARCO Branded Site #538, 1575 Landess Avenue, Milpitas, CA., Sheet No. SB1, Scale: 1=10, Project No. BPW16043.0.
13. Roberge, Pierre R., Handbook of Corrosion Engineering, 1st Ed., McGraw Hill, 2000.
14. Terzaghi, K., Peck, R.B., 1967, "Soil Mechanics in Engineering Practice, 2nd Ed., John Wiley & Sons, Inc.
15. US Geological Survey (USGS), 1978, Milpitas Quadrangle, California, 7.5 Minute Series (topographic), United States Department of the Interior, Scale: 1:24,000.
16. USGS, 1979, Calaveras Reservoir Quadrangle, California, 7.5 Minute Series (topographic), United States Department of the Interior, Scale: 1:24,000.
17. USGS, July 12, 2016, Quaternary Fault and Fold Database of the United States (web page), http://earthquake.usgs.gov/hazards/qfaults/map/#qfaults.
18. USGS, January 30, 2017, U.S. Seismic Design Maps Application (web page), http://earthquake.usgs.gov/designmaps/us/application.php. 123
Item # C5.
FIGURES
124
Item # C5.
125
Item # C5.
126
Item # C5.
APPENDIX A
EXPLORATION LOGS
AND DRILLING PERMIT
127
Item # C5.
GENERAL NOTES
SAMPLE IDENTIFICATION
The Unified Soil Classification System (USCS), AASHTO 1988 and ASTM designations D2487 and D-2488 are used to identify the encountered materials unless otherwise noted. Coarse-grained soils are defined as having more than 50% of their dry weight retained on a #200 sieve (0.075mm); they are described as: boulders, cobbles, gravel or sand. Fine-grained soils have less than 50% of their dry weight retained on a #200 sieve; they are defined as silts or clay depending on their Atterberg Limit attributes. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size.
Description
Flat:
Elongated:
Flat & Elongated:
Description
Angular:
Subangular:
Subrounded:
Rounded:
Criteria
Particles with width/thickness ratio > 3
Particles with length/width ratio > 3
Particles meet criteria for both flat and
elongated
Descriptive Term
Trace:
With:
Modifier:
Size Range
Over 300 mm (>12 in.)
75 mm to 300 mm (3 in. to 12 in.)
19 mm to 75 mm (¾ in. to 3 in.)
4.75 mm to 19 mm (No.4 to ¾ in.)
2 mm to 4.75 mm (No.10 to No.4)
0.42 mm to 2 mm (No.40 to No.10)
0.075 mm to 0.42 mm (No. 200 to No.40)
0.005 mm to 0.075 mm
<0.005 mm
Component
Boulders:
Cobbles:
Coarse-Grained Gravel:
Fine-Grained Gravel:
Coarse-Grained Sand:
Medium-Grained Sand:
Fine-Grained Sand:
Silt:
Clay:
ANGULARITY OF COARSE-GRAINED PARTICLESRELATIVE DENSITY OF COARSE-GRAINED SOILS N - Blows/foot
0 - 4
4 - 10
10 - 30
30 - 50
50 - 80
80+
Relative Density
Very Loose
Loose
Medium Dense
Dense
Very Dense
Extremely Dense
RELATIVE PROPORTIONS OF FINES
% Dry Weight
< 5%
5% to 12%
>12%
Standard "N" penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2-inch O.D.
Split-Spoon.
A "N" penetration value corrected to an equivalent 60% hammer energy transfer efficiency (ETR) Unconfined compressive strength, TSF
Pocket penetrometer value, unconfined compressive strength, TSF Moisture/water content, %
Liquid Limit, %
Plastic Limit, %
Plasticity Index = (LL-PL),%
Dry unit weight, pcf
Apparent groundwater level at time noted
Criteria
Particles have sharp edges and relatively plane
sides with unpolished surfaces
Particles are similar to angular description, but have
rounded edges
Particles have nearly plane sides, but have
well-rounded corners and edges
Particles have smoothly curved sides and no edges
N:
N60:
Qu:
Qp:
w%:
LL:
PL:
PI:
DD:
, ,
GRAIN-SIZE TERMINOLOGY PARTICLE SHAPE
SOIL PROPERTY SYMBOLS
Shelby Tube - 3" O.D., except where noted.
Rock Core
Texas Cone
Bulk Sample
Pressuremeter
Cone Penetrometer Testing with
Pore-Pressure Readings
DRILLING AND SAMPLING SYMBOLS
Solid Flight Auger - typically 4" diameter
flights, except where noted.
Hollow Stem Auger - typically 3¼" or 4¼ I.D.
openings, except where noted.
Mud Rotary - Uses a rotary head with
Bentonite or Polymer Slurry
Diamond Bit Core Sampler
Hand Auger
Power Auger - Handheld motorized auger
Split-Spoon - 1 3/8" I.D., 2" O.D., except
where noted.
SFA:
HSA:
M.R.:
R.C.:
H.A.:
P.A.:
SS:
ST:
RC:
TC:
BS:
PM:
CPT-U:
128
Item # C5.
GENERAL NOTES
QU - TSF N - Blows/foot Consistency
0 - 2
2 - 4
4 - 8
8 - 15
15 - 30
30 - 50
50+
Criteria
Absence of moisture, dusty, dry to the touch
Damp but no visible water
Visible free water, usually soil is below water table
RELATIVE PROPORTIONS OF SAND AND GRAVEL
% Dry Weight
< 15%
15% to 30%
>30%
Descriptive Term
Trace:
With:
Modifier:
0 - 0.25
0.25 - 0.50
0.50 - 1.00
1.00 - 2.00
2.00 - 4.00
4.00 - 8.00
8.00+
MOISTURE CONDITION DESCRIPTIONCONSISTENCY OF FINE-GRAINED SOILS Description
Blocky:
Lensed:
Layer:
Seam:
Parting:
Description
Stratified:
Laminated:
Fissured:
Slickensided:
STRUCTURE DESCRIPTION
QU - TSF
Extremely Soft
Very Soft
Soft
Medium Hard
Moderately Hard
Hard
Very Hard
SCALE OF RELATIVE ROCK HARDNESS ROCK BEDDING THICKNESSES Consistency
Criteria
Alternating layers of varying material or color with
layers at least ¼-inch (6 mm) thick
Alternating layers of varying material or color with
layers less than ¼-inch (6 mm) thick
Breaks along definite planes of fracture with little
resistance to fracturing
Fracture planes appear polished or glossy,
sometimes striated
Criteria
Greater than 3-foot (>1.0 m)
1-foot to 3-foot (0.3 m to 1.0 m)
4-inch to 1-foot (0.1 m to 0.3 m)
1¼-inch to 4-inch (30 mm to 100 mm)
½-inch to 1¼-inch (10 mm to 30 mm)
1/8-inch to ½-inch (3 mm to 10 mm)
1/8-inch or less "paper thin" (<3 mm)
Description
Dry:
Moist:
Wet:
Description
Very Thick Bedded
Thick Bedded
Medium Bedded
Thin Bedded
Very Thin Bedded
Thickly Laminated
Thinly Laminated
2.5 - 10
10 - 50
50 - 250
250 - 525
525 - 1,050
1,050 - 2,600
>2,600
(Continued)
Component
Very Coarse Grained
Coarse Grained
Medium Grained
Fine Grained
Very Fine Grained
GRAIN-SIZED TERMINOLOGY
(Typically Sedimentary Rock)
ROCK VOIDS
Voids
Pit
Vug
Cavity
Cave
Void Diameter
<6 mm (<0.25 in)
6 mm to 50 mm (0.25 in to 2 in)
50 mm to 600 mm (2 in to 24 in)
>600 mm (>24 in)
ROCK QUALITY DESCRIPTION
RQD Value
90 -100
75 - 90
50 - 75
25 -50
Less than 25
Size Range
>4.76 mm
2.0 mm - 4.76 mm
0.42 mm - 2.0 mm
0.075 mm - 0.42 mm
<0.075 mm
Rock generally fresh, joints stained and discoloration
extends into rock up to 25 mm (1 in), open joints may
contain clay, core rings under hammer impact.
Rock mass is decomposed 50% or less, significant
portions of the rock show discoloration and
weathering effects, cores cannot be broken by hand
or scraped by knife.
Rock mass is more than 50% decomposed, complete
discoloration of rock fabric, core may be extremely
broken and gives clunk sound when struck by
hammer, may be shaved with a knife.
Rock Mass Description
Excellent
Good
Fair
Poor
Very Poor
DEGREE OF WEATHERING
Slightly Weathered:
Weathered:
Highly Weathered:
Criteria
Cohesive soil that can be broken down into small
angular lumps which resist further breakdown
Inclusion of small pockets of different soils
Inclusion greater than 3 inches thick (75 mm)
Inclusion 1/8-inch to 3 inches (3 to 75 mm) thick
extending through the sample
Inclusion less than 1/8-inch (3 mm) thick
Very Soft
Soft
Firm (Medium Stiff)
Stiff
Very Stiff
Hard
Very Hard
129
Item # C5.
OH
CH
MH
OL
CL
ML
SC
SM
SP
COARSE
GRAINED
SOILS
SW
TYPICA L
DESCR IPTIONS
WELL-GRADED GRAVELS, GRAVEL -
SAND MIXTURES, LITTLE OR NO FINES
POORLY-GRADED GRAVELS, GRAVEL
- SAND MIXTURES, LITTLE OR NO
FINES
SILTY GRAVELS, GRAVEL - SAND -
SILT MIXTURES
LETTERGRA PH
SYMBOLSMA JOR DIVISIONS
SOIL CLA SSIFICA TION CHA RT
PT
GC
GM
GP
GW
CLAYEY GRAVELS, GRAVEL - SAND -
CLAY MIXTURES
WELL-GRADED SANDS, GRAVELLY
SANDS, LITTLE OR NO FINES
POORLY-GRADED SANDS, GRAVELLY
SAND, LITTLE OR NO FINES
SILTY SANDS, SAND - SILT MIXTURES
CLAYEY SANDS, SAND - CLAY
MIXTURES
INORGANIC SILTS AND VERY FINE
SANDS, ROCK FLOUR, SILTY OR
CLAYEY FINE SANDS OR CLAYEY
SILTS WITH SLIGHT PLASTICITY
INORGANIC CLAYS OF LOW TO
MEDIUM PLASTICITY, GRAVELLY
CLAYS, SANDY CLAYS, SILTY CLAYS,
LEAN CLAYS
ORGANIC SILTS AND ORGANIC SILTY
CLAYS OF LOW PLASTICITY
INORGANIC SILTS, MICACEOUS OR
DIATOMACEOUS FINE SAND OR SILTY
SOILS
INORGANIC CLAYS OF HIGH
PLASTICITY
ORGANIC CLAYS OF MEDIUM TO HIGH
PLASTICITY, ORGANIC SILTS
PEAT, HUMUS, SWAMP SOILS WITH
HIGH ORGANIC CONTENTS
CLEAN
GRAVELS
GRAVELS WITH
FINES
CLEAN SANDS
(LITTLE OR NO FINES)
SANDS WITH
FINES
LIQUID LIMIT
LESS THAN 50
LIQUID LIMIT
GREATER THAN 50
HIGHLY ORGANIC SOILS
GRAVEL
AND
GRAVELLY
SOILS
(APPRECIABLE AMOUNT
OF FINES)
(APPRECIABLE AMOUNT
OF FINES)
(LITTLE OR NO FINES)
FINE
GRAINED
SOILS
SAND
AND
SANDY
SOILS
SILTS
AND
CLAYS
SILTS
AND
CLAYS
MORE THAN 50%
OF MATERIAL IS
LARGER THAN NO.
200 SIEVE SIZE
MORE THAN 50%
OF MATERIAL IS
SMALLER THAN
NO. 200 SIEVE
SIZE
MORE THAN 50%
OF COARSE
FRACTION
PASSING ON NO. 4
SIEVE
MORE THAN 50%
OF COARSE
FRACTION
RETAINED ON NO.
4 SIEVE
NOTE: DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS 130
Item # C5.
1 2
3 4
5 6
7 8
18 18
18 18
18 18
18 16
9-13-20
N=21
6-10-10
N=20
7-9-13
N=14
12-17-19
N=36
11-23-31
N=54
11-13-17
N=30
9-16-21
N=37
11-25-50/4
2 inches asphalt over 4 inches aggregate
Sandy Lean CLAY, dark brown, moist, very stiff,
trace fine gravel
becomes dark olive to medium brown, stiff, few
fine to medium gravel
becomes hard
becomes medium brown, hard
becomes light brown
CL
15 15
12 9
DD = 109 pcf
% passing #200=68
DD = 103 pcf
LL = 32
PL = 16
% passing #200=53
PROJECT NO.: 575-1284
PROJECT: BP - Milpitas
Depth, (feet)
STRENGTH, tsf
Additional
Remarks
USCS Classification
0 Qp
Sample Type
2.0 0
Moisture, %
MoistureMATERIAL DESCRIPTION
STANDARD PENETRATION
TEST DATA
N in blows/ft
Qu
Sample No.
Graphic Log
50 PL
Elevation (feet)
LL
4.0 25
Recovery (inches)
While Drilling
C ont i nued N ex t P age
LATITUDE: 37.4162°
LONGITUDE: -121.8755°
LOCATION: 1575 Landess Avenue
45 feet
Water
REMARKS:
DRILLER: Perfecto
Professional Service Industries, Inc.
4703 Tidewater Avenue, Suite B
Oakland, CA 94601
Telephone: (510) 434-9200 Milpitas, California
SAMPLING METHOD: 3" CMS & SPT
DATE STARTED: 11/20/17
BENCHMARK: N/A
The stratification lines represent approximate boundaries. The transition may be gradual. Sheet 1 of 2 DRILL COMPANY: HEW Drilling
STATION: N/A OFFSET: N/A
LOGGED BY: M. Uribe
COMPLETION DEPTH 51.5 ft DRILL RIG: CME 75
DRILLING METHOD: Hollow Stem Auger
ELEVATION: N/A
REVIEWED BY: M. Place
EFFICIENCY N/A
HAMMER TYPE: Automatic BORING LOCATION:
0 5
10 15
20 25
30 DATE COMPLETED: 11/20/17 BORING B-1
>>
>>
>>
>>
>>
>>
>>
131
Item # C5.
9 10
11 12
13 18
17 18
18 18
10-14-16
N=30
14-38-50/5
7-8-12
N=20
8-8-12
N=20
22-40-50
N=90
Clayey SAND, light brown, moist, medium
dense, trace fine sand, few fine gravel
becomes wet
Poorly graded SAND with gravel, light brown,
wet, very dense, fine to coarse sand, fine to
medium gravel
End of boring at 51-1/2 feet below grade.
Groundwater was encountered at 45 feet.
Borehole was backfilled with cement grout and
topped with cement.
Calif. sampler N Values were converted to
SPT-equivalent (Calif. * 0.65).
CL
SC
SP
8 17
LL = 33
PL = 15
% passing #200=56
LL = 32
PL = 20
% passing #200=42
PROJECT NO.: 575-1284
PROJECT: BP - Milpitas
Depth, (feet)
STRENGTH, tsf
Additional
Remarks
USCS Classification
0 Qp
Sample Type
2.0 0
Moisture, %
MoistureMATERIAL DESCRIPTION
STANDARD PENETRATION
TEST DATA
N in blows/ft
Qu
Sample No.
Graphic Log
50 PL
Elevation (feet)
LL
4.0 25
Recovery (inches)
While Drilling
LATITUDE: 37.4162°
LONGITUDE: -121.8755°
LOCATION: 1575 Landess Avenue
45 feet
Water
REMARKS:
DRILLER: Perfecto
Professional Service Industries, Inc.
4703 Tidewater Avenue, Suite B
Oakland, CA 94601
Telephone: (510) 434-9200 Milpitas, California
SAMPLING METHOD: 3" CMS & SPT
DATE STARTED: 11/20/17
BENCHMARK: N/A
The stratification lines represent approximate boundaries. The transition may be gradual. Sheet 2 of 2 DRILL COMPANY: HEW Drilling
STATION: N/A OFFSET: N/A
LOGGED BY: M. Uribe
COMPLETION DEPTH 51.5 ft DRILL RIG: CME 75
DRILLING METHOD: Hollow Stem Auger
ELEVATION: N/A
REVIEWED BY: M. Place
EFFICIENCY N/A
HAMMER TYPE: Automatic BORING LOCATION:
30 35
40 45
50 DATE COMPLETED: 11/20/17 BORING B-1
>>
132
Item # C5.
1 2
3 4
5 6
7 18
18 18
18 18
18 18
14-18-22
N=26
2-3-5
N=8
8-14-20
N=22
10-13-17
N=30
6-9-13
N=22
6-8-11
N=19
11-17-23
N=40
3 inches asphalt over 3 inches aggregate
Sandy Lean CLAY, dark brown, moist, very stiff,
trace fine gravel
becomes light brown, stiff
becomes very stiff
becomes hard
End of boring at 21-1/2 feet below grade.
Groundwater was not encountered.
Borehole was backfilled with cement grout and
topped with cement.
Calif. sampler N Values were converted to
SPT-equivalent (Calif. * 0.65).
CL
14 14
DD = 125 pcf
DD = 113 pcf
PROJECT NO.: 575-1284
PROJECT: BP - Milpitas
Depth, (feet)
STRENGTH, tsf
Additional
Remarks
USCS Classification
0 Qp
Sample Type
2.0 0
Moisture, %
MoistureMATERIAL DESCRIPTION
STANDARD PENETRATION
TEST DATA
N in blows/ft
Qu
Sample No.
Graphic Log
50 PL
Elevation (feet)
LL
4.0 25
Recovery (inches)
LATITUDE: 37.4162°
LONGITUDE: -121.8755°
LOCATION: 1575 Landess Avenue
Water
REMARKS:
DRILLER: Perfecto
Professional Service Industries, Inc.
4703 Tidewater Avenue, Suite B
Oakland, CA 94601
Telephone: (510) 434-9200 Milpitas, California
SAMPLING METHOD: 3" CMS & SPT
DATE STARTED: 11/20/17
BENCHMARK: N/A
The stratification lines represent approximate boundaries. The transition may be gradual. Sheet 1 of 1 DRILL COMPANY: HEW Drilling
STATION: N/A OFFSET: N/A
LOGGED BY: M. Uribe
COMPLETION DEPTH 21.5 ft DRILL RIG: CME 75
DRILLING METHOD: Hollow Stem Auger
ELEVATION: N/A
REVIEWED BY: M. Place
EFFICIENCY N/A
HAMMER TYPE: Automatic BORING LOCATION:
0 5
10 15
20 DATE COMPLETED: 11/20/17 BORING B-2
>>
>>
>>
>>
>>
133
Item # C5.
134
Item # C5.
135
Item # C5.
136
Item # C5.
137
Item # C5.
APPENDIX B
LABORATORY TEST RESULTS
138
Item # C5.
LABORATORY TEST RESULTS
Laboratory Testing Program
Laboratory tests were performed on representative soil samples to determine their relative engineering properties. Tests were performed in general accordance with test methods of the American Society for Testing Materials or other accepted standards. The following presents a brief description of the various test methods used.
Classification - Soils were classified visually according to the Unified Soil Classification System. Visual classifications were supplemented by laboratory testing of selected samples in general accordance with ASTM D2487. The soil classifications are shown on the boring logs in Appendix A.
In-Situ Moisture / Density - The in-place moisture content and dry unit weight of selected samples were determined using relatively undisturbed samples from the linear rings of a 2.38- inch I.D. modified California Sampler. The moisture content of representative SPT samples was also determined. The dry unit weight and moisture contents are shown on the boring logs.
Expansion Index - Expansion Index testing was performed on a representative sample of the on-site soils, remolded and surcharged to 144 pounds per square foot in general accordance with the Uniform Building Code Standard No. 18-2. The result of this test is provided in the text of this report and below.
Atterberg Limits – The liquid limit, plastic limit, and plasticity index of selected representative samples were determined in accordance with ASTM D4318. The liquid limit and plastic indices are shown on the Boring Logs and below.
Material Finer than #200 – Select samples from the borings were analyzed for grain size in general conformance with ASTM C 117. In general, oven dried samples are passed through a
0.75 µm (#200) sieve by adding water and washing fine grained material through the screen then drying back the retained material and comparing it to the total sample mass to find the percent retain and passing the #200 sieve. The percent passing the #200 sieve is shown on the Boring Logs.
Soil Sulfate / Chloride Test – In order to estimate the concrete degradation potential of soils, the soluble sulfate and chloride content of a representative sample of the on-site soil, provided in the text of this report, was determined in accordance with EPA Test Method 300.0.
pH (Potential of Hydrogen) – The measure of acidity or alkalinity of a material is referred to as the pH factor, which increases with alkalinity and decreases with acidity. The corrosivity potential of iron increases with low pH (4-5) while the corrosivity potential of copper increases with high pH (10-11). The pH value of a representative sample of the on-site soil, provided in the text of this report, was determined in accordance with EPA Test Method 9045B.
Resistivity – The electrical resistivity of a soil is a measure of its resistance to electrical current flow. Corrosion of buried ferrous metals is an electrochemical process which is related to the flow of electrical current from the metal to the soil. Lower electrical resistivity (higher currents) result from higher moisture and chemical contents in the soil. Resistivity is minimal when the soil is saturated. The resistivity of a representative sample of the on-site soil, provided in the text of this report, was determined in accordance with AASHTO Test Method T 288-91.
139
Item # C5.
RESULTS OF EXPANSION INDEX TEST
(UBC 18-2)
SAMPLE LOCATION EXPANSION INDEX
B-1 Bulk Near-Surface (1-4 feet) Soil 40 (Low)
140
Item # C5.
Atterberg Limits
(ASTM D4318-98 AASHTO T89/90)
Project Name: Project Number:
Laboratory Number: Date Tested:
Sample Description:
30 36 39 43 34 35
28.33 28.37 28.36 28.44 28.53 28.6
35.96 34.82 35.81 35.01 34.65 34.95
34.2 33.21 33.91 34.07 33.79 34.06
1.76 1.61 1.9 0.94 0.86 0.89
5.87 4.84 5.55 5.63 5.26 5.46
30.0 33.3 34.2 16.7 16.3 16.3
34 23 15
B-1
25.5 0
2.4 4.52
1 35 31
273.50
591.90
34 566.70
25.2 293.2
8.6 33
32 16
32 16
31 30
575-1284
Area of Ring [A]
Height of the Sample [h]
BP - Milpitas
0575 (Oakland, CA)
Boring B-1, SP-8, Depth 25.5 ft
WEIGHT OF WATER
WEIGHT OF DRY SOIL
LIQUID LIMIT
December 5, 2017
WEIGHT OF CAN + WET SOIL
WEIGHT OF CAN + DRY SOIL
0.00 PLASTIC LIMIT
CAN NUMBER
WEIGHT OF CAN
Diameter of Ring
Moisture Content
Wet Density of the Sample
[d=(c*3.81)/(A*h)
Tare Number
MOISTURE CONTENT
NUMBER OF BLOWS
Boring Number
Sample Depth
Density
Weight of Sample + Ring [a]
Weight of Ring [b]
Weight of Sample [c=a-b]
Tare Weight (g) [e]
Wet Weight + Tare (g) [f]
Dry Weight + Tare (g) [g]
Plasticity Index
Dry Density [k=d/(1+j/100)]
Liquid Limit
Plastic Limit
Weight of Dry Sample (g) [i=g-e]
Moisture Content (%) [j=(h/i)*100]
Weight of Water (g) [h=f-g]
Equation of “A” – Line
Horizontal at PI=4 to LL=25.5,
Then PI= 0.73 (LL - 20)
Equation of “U” – Line
Vertical at LL=16 to PI=7,
Then PI= 0.9 (LL – 8)
0 10
20 30
40 50
60 0 10 20 30 40 50 60 70 80 90 100 110
LIQUID LIMIT (LL)
PLASTICITY INDEX (PI)
MH OR OH
ML OR OL CL-ML
CL OR OL
CH OR OH
141
Item # C5.
Atterberg Limits
(ASTM D4318-98 AASHTO T89/90)
Project Name: Project Number:
Laboratory Number: Date Tested:
Sample Description:
25 24 41 21 38 32
28.65 28.31 28.24 28.41 28.46 28.39
35.77 34.91 37.59 34.11 33.21 34.42
34.08 33.27 35.24 33.36 32.6 33.61
1.69 1.64 2.35 0.75 0.61 0.81
5.43 4.96 7 4.95 4.14 5.22
31.1 33.1 33.6 15.2 14.7 15.5
35 24 19
B-1
35.5 0
2.4 4.52
1 35 85
282.20
565.50
545.70
34 19.8
263.5
7.5 33
33 15
32 18
31 30
Plasticity Index
Weight of Water (g) [h=f-g]
Weight of Dry Sample (g) [i=g-e]
Moisture Content (%) [j=(h/i)*100]
Dry Density [k=d/(1+j/100)]
Liquid Limit
Plastic Limit
0.00 Moisture Content
Tare Number
Tare Weight (g) [e]
Wet Weight + Tare (g) [f]
Dry Weight + Tare (g) [g]
Weight of Ring [b]
Weight of Sample [c=a-b]
Diameter of Ring
Area of Ring [A]
Height of the Sample [h]
Wet Density of the Sample
[d=(c*3.81)/(A*h)
MOISTURE CONTENT
NUMBER OF BLOWS
Boring Number
Sample Depth
Density
Weight of Sample + Ring [a]
CAN NUMBER
WEIGHT OF CAN
WEIGHT OF CAN + WET SOIL
WEIGHT OF CAN + DRY SOIL
WEIGHT OF WATER
WEIGHT OF DRY SOIL
BP - Milpitas 575-1284
0575 (Oakland, CA) December 5, 2017
Boring B-1, SP-10, Depth 35.5 ft
LIQUID LIMIT PLASTIC LIMIT
Equation of “A” – Line
Horizontal at PI=4 to LL=25.5,
Then PI= 0.73 (LL - 20)
Equation of “U” – Line
Vertical at LL=16 to PI=7,
Then PI= 0.9 (LL – 8)
0 10
20 30
40 50
60 0 10 20 30 40 50 60 70 80 90 100 110
LIQUID LIMIT (LL)
PLASTICITY INDEX (PI)
MH OR OH
ML OR OL CL-ML
CL OR OL
CH OR OH
142
Item # C5.
Atterberg Limits
(ASTM D4318-98 AASHTO T89/90)
Project Name: Project Number:
Laboratory Number: Date Tested:
Sample Description:
12 19 28 11 26 44
28.38 28.19 28.49 28.47 28.26 28.49
34.34 35.66 36.06 33.18 34.51 35.14
32.94 33.9 34.18 32.41 33.48 34.02
1.4 1.76 1.88 0.77 1.03 1.12
4.56 5.71 5.69 3.94 5.22 5.53
30.7 30.8 33.0 19.5 19.7 20.3
35 28 20
B-1
45.5 0
2.4 4.52
1 34 87
282.10
770.00
33 700.20
69.8 418.1
16.7 32
32 20
31 12
30 29
Plasticity Index
Weight of Water (g) [h=f-g]
Weight of Dry Sample (g) [i=g-e]
Moisture Content (%) [j=(h/i)*100]
Dry Density [k=d/(1+j/100)]
Liquid Limit
Plastic Limit
0.00 Moisture Content
Tare Number
Tare Weight (g) [e]
Wet Weight + Tare (g) [f]
Dry Weight + Tare (g) [g]
Weight of Ring [b]
Weight of Sample [c=a-b]
Diameter of Ring
Area of Ring [A]
Height of the Sample [h]
Wet Density of the Sample
[d=(c*3.81)/(A*h)
MOISTURE CONTENT
NUMBER OF BLOWS
Boring Number
Sample Depth
Density
Weight of Sample + Ring [a]
CAN NUMBER
WEIGHT OF CAN
WEIGHT OF CAN + WET SOIL
WEIGHT OF CAN + DRY SOIL
WEIGHT OF WATER
WEIGHT OF DRY SOIL
BP - Milpitas 575-1284
0575 (Oakland, CA) December 5, 2017
Boring B-1, SP-12, Depth 45.5 ft
LIQUID LIMIT PLASTIC LIMIT
Equation of “A” – Line
Horizontal at PI=4 to LL=25.5,
Then PI= 0.73 (LL - 20)
Equation of “U” – Line
Vertical at LL=16 to PI=7,
Then PI= 0.9 (LL – 8)
0 10
20 30
40 50
60 0 10 20 30 40 50 60 70 80 90 100 110
LIQUID LIMIT (LL)
PLASTICITY INDEX (PI)
MH OR OH
ML OR OL CL-ML
CL OR OL
CH OR OH
143
Item # C5.
APPENDIX C
LIQUEFACTION ANALYSIS
144
Item # C5.
LiquefyPro CivilTech Software USA www.civiltech.com CivilTech Corporation
LIQUEFACTION ANALYSIS
BP Milpitas
Plate A-1
Hole N o.=1 W at er Dept h=33 f t Magni t ud e=6 .6 3 Accel er at i on=0.6 97 g
( f t)
0 10
20 30
40 50
60 7 0
33 120 NoLq
20 120 NoLq
21 120 NoLq
36 120 NoLq
54 120 NoLq
30 120 NoLq
37 120 NoLq
75 120 NoLq
30 120 NoLq
88 120 NoLq
20 120 40
20 120 40
90 120 40
Raw Unit Fines
SPT Weight %
Shear Stress Ratio
CRR CSR fs1
Shaded Zone has Liquefaction Potential
0 1
Settlement
Saturated
Unsaturat.
S = 0.57 in.
0 (in.) 1
fs1=1.30
145
Item # C5.
***********************************************************************************************
LIQUEFACTION ANALYSIS SUMMARY
Copyright by CivilTech Software
www.civiltech.com
*********************************************************************************************** Font: Courier New, Regular, Size 8 is recommended for this report.
Licensed to , 12/13/2017 3:13:51 PM
Input File Name: P:\712 GEO - Also See 578 Geo\2017 Projects\Oakland Projects\ BP - Milpitas\B-1.liq
Title: BP Milpitas
Subtitle:
Surface Elev.=
Hole No.=1
Depth of Hole= 50.50 ft
Water Table during Earthquake= 33.00 ft
Water Table during In-Situ Testing= 45.00 ft
Max. Acceleration= 0.7 g
Earthquake Magnitude= 6.63
Input Data:
Surface Elev. =
Hole No. = 1
Depth of Hole = 50.50 ft
Water Table during Earthquake = 33.00 ft
Water Table during In-Situ Testing = 45.00 ft
Max. Acceleration = 0.7 g
Earthquake Magnitude = 6.63
No-Liquefiable Soils: CL, OL are Non-Liq. Soil
1. SPT or BPT Calculation.
2. Settlement Analysis Method: Ishihara / Yoshimine
3. Fines Correction for Liquefaction: Idriss/Seed
4. Fine Correction for Settlement: During Liquefaction*
5. Settlement Calculation in: Liq. zone only
6. Hammer Energy Ratio, Ce = 1.25
7. Borehole Diameter, Cb = 1
8. Sampling Method, Cs = 1.2
9. User request factor of safety (apply to CSR), User = 1.3 Plot one CSR curve (fs1 = User)
10. Use Curve Smoothing: Yes*
* Recommended Options
In-Situ Test Data:
Depth SPT gamma Fines
ft pcf %
____________________________________
1.00 33.00 120.00 NoLiq
2.50 20.00 120.00 NoLiq
5.00 21.00 120.00 NoLiq
7.50 36.00 120.00 NoLiq
10.00 54.00 120.00 NoLiq
15.00 30.00 120.00 NoLiq
20.00 37.00 120.00 NoLiq
25.00 75.00 120.00 NoLiq
30.00 30.00 120.00 NoLiq
35.00 88.00 120.00 NoLiq
40.00 20.00 120.00 40.00
45.00 20.00 120.00 40.00
50.00 90.00 120.00 40.00
____________________________________
Output Results:
Settlement of Saturated Sands = 0.57 in.
Settlement of Unsaturated Sands = 0.00 in.
Total Settlement of Saturated and Unsaturated Sands = 0.57 in.
Differential Settlement = 0.284 to 0.375 in.
Depth CRRm CSRfs F.S. S_sat. S_dry S_all
ft in. in. in.
_______________________________________________________
1.00 2.00 0.59 5.00 0.57 0.00 0.57
1.05 2.00 0.59 5.00 0.57 0.00 0.57
1.10 2.00 0.59 5.00 0.57 0.00 0.57 146
Item # C5.
1.15 2.00 0.59 5.00 0.57 0.00 0.57
1.20 2.00 0.59 5.00 0.57 0.00 0.57
1.25 2.00 0.59 5.00 0.57 0.00 0.57
1.30 2.00 0.59 5.00 0.57 0.00 0.57
1.35 2.00 0.59 5.00 0.57 0.00 0.57
1.40 2.00 0.59 5.00 0.57 0.00 0.57
1.45 2.00 0.59 5.00 0.57 0.00 0.57
1.50 2.00 0.59 5.00 0.57 0.00 0.57
1.55 2.00 0.59 5.00 0.57 0.00 0.57
1.60 2.00 0.59 5.00 0.57 0.00 0.57
1.65 2.00 0.59 5.00 0.57 0.00 0.57
1.70 2.00 0.59 5.00 0.57 0.00 0.57
1.75 2.00 0.59 5.00 0.57 0.00 0.57
1.80 2.00 0.59 5.00 0.57 0.00 0.57
1.85 2.00 0.59 5.00 0.57 0.00 0.57
1.90 2.00 0.59 5.00 0.57 0.00 0.57
1.95 2.00 0.59 5.00 0.57 0.00 0.57
2.00 2.00 0.59 5.00 0.57 0.00 0.57
2.05 2.00 0.59 5.00 0.57 0.00 0.57
2.10 2.00 0.59 5.00 0.57 0.00 0.57
2.15 2.00 0.59 5.00 0.57 0.00 0.57
2.20 2.00 0.59 5.00 0.57 0.00 0.57
2.25 2.00 0.59 5.00 0.57 0.00 0.57
2.30 2.00 0.59 5.00 0.57 0.00 0.57
2.35 2.00 0.59 5.00 0.57 0.00 0.57
2.40 2.00 0.59 5.00 0.57 0.00 0.57
2.45 2.00 0.59 5.00 0.57 0.00 0.57
2.50 2.00 0.59 5.00 0.57 0.00 0.57
2.55 2.00 0.59 5.00 0.57 0.00 0.57
2.60 2.00 0.59 5.00 0.57 0.00 0.57
2.65 2.00 0.59 5.00 0.57 0.00 0.57
2.70 2.00 0.59 5.00 0.57 0.00 0.57
2.75 2.00 0.59 5.00 0.57 0.00 0.57
2.80 2.00 0.59 5.00 0.57 0.00 0.57
2.85 2.00 0.59 5.00 0.57 0.00 0.57
2.90 2.00 0.58 5.00 0.57 0.00 0.57
2.95 2.00 0.58 5.00 0.57 0.00 0.57
3.00 2.00 0.58 5.00 0.57 0.00 0.57
3.05 2.00 0.58 5.00 0.57 0.00 0.57
3.10 2.00 0.58 5.00 0.57 0.00 0.57
3.15 2.00 0.58 5.00 0.57 0.00 0.57
3.20 2.00 0.58 5.00 0.57 0.00 0.57
3.25 2.00 0.58 5.00 0.57 0.00 0.57
3.30 2.00 0.58 5.00 0.57 0.00 0.57
3.35 2.00 0.58 5.00 0.57 0.00 0.57
3.40 2.00 0.58 5.00 0.57 0.00 0.57
3.45 2.00 0.58 5.00 0.57 0.00 0.57
3.50 2.00 0.58 5.00 0.57 0.00 0.57
3.55 2.00 0.58 5.00 0.57 0.00 0.57
3.60 2.00 0.58 5.00 0.57 0.00 0.57
3.65 2.00 0.58 5.00 0.57 0.00 0.57
3.70 2.00 0.58 5.00 0.57 0.00 0.57
3.75 2.00 0.58 5.00 0.57 0.00 0.57
3.80 2.00 0.58 5.00 0.57 0.00 0.57
3.85 2.00 0.58 5.00 0.57 0.00 0.57
3.90 2.00 0.58 5.00 0.57 0.00 0.57
3.95 2.00 0.58 5.00 0.57 0.00 0.57
4.00 2.00 0.58 5.00 0.57 0.00 0.57
4.05 2.00 0.58 5.00 0.57 0.00 0.57
4.10 2.00 0.58 5.00 0.57 0.00 0.57
4.15 2.00 0.58 5.00 0.57 0.00 0.57
4.20 2.00 0.58 5.00 0.57 0.00 0.57
4.25 2.00 0.58 5.00 0.57 0.00 0.57
4.30 2.00 0.58 5.00 0.57 0.00 0.57
4.35 2.00 0.58 5.00 0.57 0.00 0.57
4.40 2.00 0.58 5.00 0.57 0.00 0.57
4.45 2.00 0.58 5.00 0.57 0.00 0.57
4.50 2.00 0.58 5.00 0.57 0.00 0.57
4.55 2.00 0.58 5.00 0.57 0.00 0.57
4.60 2.00 0.58 5.00 0.57 0.00 0.57
4.65 2.00 0.58 5.00 0.57 0.00 0.57
4.70 2.00 0.58 5.00 0.57 0.00 0.57
4.75 2.00 0.58 5.00 0.57 0.00 0.57
4.80 2.00 0.58 5.00 0.57 0.00 0.57
4.85 2.00 0.58 5.00 0.57 0.00 0.57 147
Item # C5.
4.90 2.00 0.58 5.00 0.57 0.00 0.57
4.95 2.00 0.58 5.00 0.57 0.00 0.57
5.00 2.00 0.58 5.00 0.57 0.00 0.57
5.05 2.00 0.58 5.00 0.57 0.00 0.57
5.10 2.00 0.58 5.00 0.57 0.00 0.57
5.15 2.00 0.58 5.00 0.57 0.00 0.57
5.20 2.00 0.58 5.00 0.57 0.00 0.57
5.25 2.00 0.58 5.00 0.57 0.00 0.57
5.30 2.00 0.58 5.00 0.57 0.00 0.57
5.35 2.00 0.58 5.00 0.57 0.00 0.57
5.40 2.00 0.58 5.00 0.57 0.00 0.57
5.45 2.00 0.58 5.00 0.57 0.00 0.57
5.50 2.00 0.58 5.00 0.57 0.00 0.57
5.55 2.00 0.58 5.00 0.57 0.00 0.57
5.60 2.00 0.58 5.00 0.57 0.00 0.57
5.65 2.00 0.58 5.00 0.57 0.00 0.57
5.70 2.00 0.58 5.00 0.57 0.00 0.57
5.75 2.00 0.58 5.00 0.57 0.00 0.57
5.80 2.00 0.58 5.00 0.57 0.00 0.57
5.85 2.00 0.58 5.00 0.57 0.00 0.57
5.90 2.00 0.58 5.00 0.57 0.00 0.57
5.95 2.00 0.58 5.00 0.57 0.00 0.57
6.00 2.00 0.58 5.00 0.57 0.00 0.57
6.05 2.00 0.58 5.00 0.57 0.00 0.57
6.10 2.00 0.58 5.00 0.57 0.00 0.57
6.15 2.00 0.58 5.00 0.57 0.00 0.57
6.20 2.00 0.58 5.00 0.57 0.00 0.57
6.25 2.00 0.58 5.00 0.57 0.00 0.57
6.30 2.00 0.58 5.00 0.57 0.00 0.57
6.35 2.00 0.58 5.00 0.57 0.00 0.57
6.40 2.00 0.58 5.00 0.57 0.00 0.57
6.45 2.00 0.58 5.00 0.57 0.00 0.57
6.50 2.00 0.58 5.00 0.57 0.00 0.57
6.55 2.00 0.58 5.00 0.57 0.00 0.57
6.60 2.00 0.58 5.00 0.57 0.00 0.57
6.65 2.00 0.58 5.00 0.57 0.00 0.57
6.70 2.00 0.58 5.00 0.57 0.00 0.57
6.75 2.00 0.58 5.00 0.57 0.00 0.57
6.80 2.00 0.58 5.00 0.57 0.00 0.57
6.85 2.00 0.58 5.00 0.57 0.00 0.57
6.90 2.00 0.58 5.00 0.57 0.00 0.57
6.95 2.00 0.58 5.00 0.57 0.00 0.57
7.00 2.00 0.58 5.00 0.57 0.00 0.57
7.05 2.00 0.58 5.00 0.57 0.00 0.57
7.10 2.00 0.58 5.00 0.57 0.00 0.57
7.15 2.00 0.58 5.00 0.57 0.00 0.57
7.20 2.00 0.58 5.00 0.57 0.00 0.57
7.25 2.00 0.58 5.00 0.57 0.00 0.57
7.30 2.00 0.58 5.00 0.57 0.00 0.57
7.35 2.00 0.58 5.00 0.57 0.00 0.57
7.40 2.00 0.58 5.00 0.57 0.00 0.57
7.45 2.00 0.58 5.00 0.57 0.00 0.57
7.50 2.00 0.58 5.00 0.57 0.00 0.57
7.55 2.00 0.58 5.00 0.57 0.00 0.57
7.60 2.00 0.58 5.00 0.57 0.00 0.57
7.65 2.00 0.58 5.00 0.57 0.00 0.57
7.70 2.00 0.58 5.00 0.57 0.00 0.57
7.75 2.00 0.58 5.00 0.57 0.00 0.57
7.80 2.00 0.58 5.00 0.57 0.00 0.57
7.85 2.00 0.58 5.00 0.57 0.00 0.57
7.90 2.00 0.58 5.00 0.57 0.00 0.57
7.95 2.00 0.58 5.00 0.57 0.00 0.57
8.00 2.00 0.58 5.00 0.57 0.00 0.57
8.05 2.00 0.58 5.00 0.57 0.00 0.57
8.10 2.00 0.58 5.00 0.57 0.00 0.57
8.15 2.00 0.58 5.00 0.57 0.00 0.57
8.20 2.00 0.58 5.00 0.57 0.00 0.57
8.25 2.00 0.58 5.00 0.57 0.00 0.57
8.30 2.00 0.58 5.00 0.57 0.00 0.57
8.35 2.00 0.58 5.00 0.57 0.00 0.57
8.40 2.00 0.58 5.00 0.57 0.00 0.57
8.45 2.00 0.58 5.00 0.57 0.00 0.57
8.50 2.00 0.58 5.00 0.57 0.00 0.57
8.55 2.00 0.58 5.00 0.57 0.00 0.57
8.60 2.00 0.58 5.00 0.57 0.00 0.57 148
Item # C5.
8.65 2.00 0.58 5.00 0.57 0.00 0.57
8.70 2.00 0.58 5.00 0.57 0.00 0.57
8.75 2.00 0.58 5.00 0.57 0.00 0.57
8.80 2.00 0.58 5.00 0.57 0.00 0.57
8.85 2.00 0.58 5.00 0.57 0.00 0.57
8.90 2.00 0.58 5.00 0.57 0.00 0.57
8.95 2.00 0.58 5.00 0.57 0.00 0.57
9.00 2.00 0.58 5.00 0.57 0.00 0.57
9.05 2.00 0.58 5.00 0.57 0.00 0.57
9.10 2.00 0.58 5.00 0.57 0.00 0.57
9.15 2.00 0.58 5.00 0.57 0.00 0.57
9.20 2.00 0.58 5.00 0.57 0.00 0.57
9.25 2.00 0.58 5.00 0.57 0.00 0.57
9.30 2.00 0.58 5.00 0.57 0.00 0.57
9.35 2.00 0.58 5.00 0.57 0.00 0.57
9.40 2.00 0.58 5.00 0.57 0.00 0.57
9.45 2.00 0.58 5.00 0.57 0.00 0.57
9.50 2.00 0.58 5.00 0.57 0.00 0.57
9.55 2.00 0.58 5.00 0.57 0.00 0.57
9.60 2.00 0.58 5.00 0.57 0.00 0.57
9.65 2.00 0.58 5.00 0.57 0.00 0.57
9.70 2.00 0.58 5.00 0.57 0.00 0.57
9.75 2.00 0.58 5.00 0.57 0.00 0.57
9.80 2.00 0.58 5.00 0.57 0.00 0.57
9.85 2.00 0.58 5.00 0.57 0.00 0.57
9.90 2.00 0.58 5.00 0.57 0.00 0.57
9.95 2.00 0.58 5.00 0.57 0.00 0.57
10.00 2.00 0.58 5.00 0.57 0.00 0.57
10.05 2.00 0.58 5.00 0.57 0.00 0.57
10.10 2.00 0.58 5.00 0.57 0.00 0.57
10.15 2.00 0.58 5.00 0.57 0.00 0.57
10.20 2.00 0.57 5.00 0.57 0.00 0.57
10.25 2.00 0.57 5.00 0.57 0.00 0.57
10.30 2.00 0.57 5.00 0.57 0.00 0.57
10.35 2.00 0.57 5.00 0.57 0.00 0.57
10.40 2.00 0.57 5.00 0.57 0.00 0.57
10.45 2.00 0.57 5.00 0.57 0.00 0.57
10.50 2.00 0.57 5.00 0.57 0.00 0.57
10.55 2.00 0.57 5.00 0.57 0.00 0.57
10.60 2.00 0.57 5.00 0.57 0.00 0.57
10.65 2.00 0.57 5.00 0.57 0.00 0.57
10.70 2.00 0.57 5.00 0.57 0.00 0.57
10.75 2.00 0.57 5.00 0.57 0.00 0.57
10.80 2.00 0.57 5.00 0.57 0.00 0.57
10.85 2.00 0.57 5.00 0.57 0.00 0.57
10.90 2.00 0.57 5.00 0.57 0.00 0.57
10.95 2.00 0.57 5.00 0.57 0.00 0.57
11.00 2.00 0.57 5.00 0.57 0.00 0.57
11.05 2.00 0.57 5.00 0.57 0.00 0.57
11.10 2.00 0.57 5.00 0.57 0.00 0.57
11.15 2.00 0.57 5.00 0.57 0.00 0.57
11.20 2.00 0.57 5.00 0.57 0.00 0.57
11.25 2.00 0.57 5.00 0.57 0.00 0.57
11.30 2.00 0.57 5.00 0.57 0.00 0.57
11.35 2.00 0.57 5.00 0.57 0.00 0.57
11.40 2.00 0.57 5.00 0.57 0.00 0.57
11.45 2.00 0.57 5.00 0.57 0.00 0.57
11.50 2.00 0.57 5.00 0.57 0.00 0.57
11.55 2.00 0.57 5.00 0.57 0.00 0.57
11.60 2.00 0.57 5.00 0.57 0.00 0.57
11.65 2.00 0.57 5.00 0.57 0.00 0.57
11.70 2.00 0.57 5.00 0.57 0.00 0.57
11.75 2.00 0.57 5.00 0.57 0.00 0.57
11.80 2.00 0.57 5.00 0.57 0.00 0.57
11.85 2.00 0.57 5.00 0.57 0.00 0.57
11.90 2.00 0.57 5.00 0.57 0.00 0.57
11.95 2.00 0.57 5.00 0.57 0.00 0.57
12.00 2.00 0.57 5.00 0.57 0.00 0.57
12.05 2.00 0.57 5.00 0.57 0.00 0.57
12.10 2.00 0.57 5.00 0.57 0.00 0.57
12.15 2.00 0.57 5.00 0.57 0.00 0.57
12.20 2.00 0.57 5.00 0.57 0.00 0.57
12.25 2.00 0.57 5.00 0.57 0.00 0.57
12.30 2.00 0.57 5.00 0.57 0.00 0.57
12.35 2.00 0.57 5.00 0.57 0.00 0.57 149
Item # C5.
12.40 2.00 0.57 5.00 0.57 0.00 0.57
12.45 2.00 0.57 5.00 0.57 0.00 0.57
12.50 2.00 0.57 5.00 0.57 0.00 0.57
12.55 2.00 0.57 5.00 0.57 0.00 0.57
12.60 2.00 0.57 5.00 0.57 0.00 0.57
12.65 2.00 0.57 5.00 0.57 0.00 0.57
12.70 2.00 0.57 5.00 0.57 0.00 0.57
12.75 2.00 0.57 5.00 0.57 0.00 0.57
12.80 2.00 0.57 5.00 0.57 0.00 0.57
12.85 2.00 0.57 5.00 0.57 0.00 0.57
12.90 2.00 0.57 5.00 0.57 0.00 0.57
12.95 2.00 0.57 5.00 0.57 0.00 0.57
13.00 2.00 0.57 5.00 0.57 0.00 0.57
13.05 2.00 0.57 5.00 0.57 0.00 0.57
13.10 2.00 0.57 5.00 0.57 0.00 0.57
13.15 2.00 0.57 5.00 0.57 0.00 0.57
13.20 2.00 0.57 5.00 0.57 0.00 0.57
13.25 2.00 0.57 5.00 0.57 0.00 0.57
13.30 2.00 0.57 5.00 0.57 0.00 0.57
13.35 2.00 0.57 5.00 0.57 0.00 0.57
13.40 2.00 0.57 5.00 0.57 0.00 0.57
13.45 2.00 0.57 5.00 0.57 0.00 0.57
13.50 2.00 0.57 5.00 0.57 0.00 0.57
13.55 2.00 0.57 5.00 0.57 0.00 0.57
13.60 2.00 0.57 5.00 0.57 0.00 0.57
13.65 2.00 0.57 5.00 0.57 0.00 0.57
13.70 2.00 0.57 5.00 0.57 0.00 0.57
13.75 2.00 0.57 5.00 0.57 0.00 0.57
13.80 2.00 0.57 5.00 0.57 0.00 0.57
13.85 2.00 0.57 5.00 0.57 0.00 0.57
13.90 2.00 0.57 5.00 0.57 0.00 0.57
13.95 2.00 0.57 5.00 0.57 0.00 0.57
14.00 2.00 0.57 5.00 0.57 0.00 0.57
14.05 2.00 0.57 5.00 0.57 0.00 0.57
14.10 2.00 0.57 5.00 0.57 0.00 0.57
14.15 2.00 0.57 5.00 0.57 0.00 0.57
14.20 2.00 0.57 5.00 0.57 0.00 0.57
14.25 2.00 0.57 5.00 0.57 0.00 0.57
14.30 2.00 0.57 5.00 0.57 0.00 0.57
14.35 2.00 0.57 5.00 0.57 0.00 0.57
14.40 2.00 0.57 5.00 0.57 0.00 0.57
14.45 2.00 0.57 5.00 0.57 0.00 0.57
14.50 2.00 0.57 5.00 0.57 0.00 0.57
14.55 2.00 0.57 5.00 0.57 0.00 0.57
14.60 2.00 0.57 5.00 0.57 0.00 0.57
14.65 2.00 0.57 5.00 0.57 0.00 0.57
14.70 2.00 0.57 5.00 0.57 0.00 0.57
14.75 2.00 0.57 5.00 0.57 0.00 0.57
14.80 2.00 0.57 5.00 0.57 0.00 0.57
14.85 2.00 0.57 5.00 0.57 0.00 0.57
14.90 2.00 0.57 5.00 0.57 0.00 0.57
14.95 2.00 0.57 5.00 0.57 0.00 0.57
15.00 2.00 0.57 5.00 0.57 0.00 0.57
15.05 2.00 0.57 5.00 0.57 0.00 0.57
15.10 2.00 0.57 5.00 0.57 0.00 0.57
15.15 2.00 0.57 5.00 0.57 0.00 0.57
15.20 2.00 0.57 5.00 0.57 0.00 0.57
15.25 2.00 0.57 5.00 0.57 0.00 0.57
15.30 2.00 0.57 5.00 0.57 0.00 0.57
15.35 2.00 0.57 5.00 0.57 0.00 0.57
15.40 2.00 0.57 5.00 0.57 0.00 0.57
15.45 2.00 0.57 5.00 0.57 0.00 0.57
15.50 2.00 0.57 5.00 0.57 0.00 0.57
15.55 2.00 0.57 5.00 0.57 0.00 0.57
15.60 2.00 0.57 5.00 0.57 0.00 0.57
15.65 2.00 0.57 5.00 0.57 0.00 0.57
15.70 2.00 0.57 5.00 0.57 0.00 0.57
15.75 2.00 0.57 5.00 0.57 0.00 0.57
15.80 2.00 0.57 5.00 0.57 0.00 0.57
15.85 2.00 0.57 5.00 0.57 0.00 0.57
15.90 2.00 0.57 5.00 0.57 0.00 0.57
15.95 2.00 0.57 5.00 0.57 0.00 0.57
16.00 2.00 0.57 5.00 0.57 0.00 0.57
16.05 2.00 0.57 5.00 0.57 0.00 0.57
16.10 2.00 0.57 5.00 0.57 0.00 0.57 150
Item # C5.
16.15 2.00 0.57 5.00 0.57 0.00 0.57
16.20 2.00 0.57 5.00 0.57 0.00 0.57
16.25 2.00 0.57 5.00 0.57 0.00 0.57
16.30 2.00 0.57 5.00 0.57 0.00 0.57
16.35 2.00 0.57 5.00 0.57 0.00 0.57
16.40 2.00 0.57 5.00 0.57 0.00 0.57
16.45 2.00 0.57 5.00 0.57 0.00 0.57
16.50 2.00 0.57 5.00 0.57 0.00 0.57
16.55 2.00 0.57 5.00 0.57 0.00 0.57
16.60 2.00 0.57 5.00 0.57 0.00 0.57
16.65 2.00 0.57 5.00 0.57 0.00 0.57
16.70 2.00 0.57 5.00 0.57 0.00 0.57
16.75 2.00 0.57 5.00 0.57 0.00 0.57
16.80 2.00 0.57 5.00 0.57 0.00 0.57
16.85 2.00 0.57 5.00 0.57 0.00 0.57
16.90 2.00 0.57 5.00 0.57 0.00 0.57
16.95 2.00 0.57 5.00 0.57 0.00 0.57
17.00 2.00 0.57 5.00 0.57 0.00 0.57
17.05 2.00 0.57 5.00 0.57 0.00 0.57
17.10 2.00 0.57 5.00 0.57 0.00 0.57
17.15 2.00 0.57 5.00 0.57 0.00 0.57
17.20 2.00 0.57 5.00 0.57 0.00 0.57
17.25 2.00 0.57 5.00 0.57 0.00 0.57
17.30 2.00 0.57 5.00 0.57 0.00 0.57
17.35 2.00 0.57 5.00 0.57 0.00 0.57
17.40 2.00 0.57 5.00 0.57 0.00 0.57
17.45 2.00 0.57 5.00 0.57 0.00 0.57
17.50 2.00 0.56 5.00 0.57 0.00 0.57
17.55 2.00 0.56 5.00 0.57 0.00 0.57
17.60 2.00 0.56 5.00 0.57 0.00 0.57
17.65 2.00 0.56 5.00 0.57 0.00 0.57
17.70 2.00 0.56 5.00 0.57 0.00 0.57
17.75 2.00 0.56 5.00 0.57 0.00 0.57
17.80 2.00 0.56 5.00 0.57 0.00 0.57
17.85 2.00 0.56 5.00 0.57 0.00 0.57
17.90 2.00 0.56 5.00 0.57 0.00 0.57
17.95 2.00 0.56 5.00 0.57 0.00 0.57
18.00 2.00 0.56 5.00 0.57 0.00 0.57
18.05 2.00 0.56 5.00 0.57 0.00 0.57
18.10 2.00 0.56 5.00 0.57 0.00 0.57
18.15 2.00 0.56 5.00 0.57 0.00 0.57
18.20 2.00 0.56 5.00 0.57 0.00 0.57
18.25 2.00 0.56 5.00 0.57 0.00 0.57
18.30 2.00 0.56 5.00 0.57 0.00 0.57
18.35 2.00 0.56 5.00 0.57 0.00 0.57
18.40 2.00 0.56 5.00 0.57 0.00 0.57
18.45 2.00 0.56 5.00 0.57 0.00 0.57
18.50 2.00 0.56 5.00 0.57 0.00 0.57
18.55 2.00 0.56 5.00 0.57 0.00 0.57
18.60 2.00 0.56 5.00 0.57 0.00 0.57
18.65 2.00 0.56 5.00 0.57 0.00 0.57
18.70 2.00 0.56 5.00 0.57 0.00 0.57
18.75 2.00 0.56 5.00 0.57 0.00 0.57
18.80 2.00 0.56 5.00 0.57 0.00 0.57
18.85 2.00 0.56 5.00 0.57 0.00 0.57
18.90 2.00 0.56 5.00 0.57 0.00 0.57
18.95 2.00 0.56 5.00 0.57 0.00 0.57
19.00 2.00 0.56 5.00 0.57 0.00 0.57
19.05 2.00 0.56 5.00 0.57 0.00 0.57
19.10 2.00 0.56 5.00 0.57 0.00 0.57
19.15 2.00 0.56 5.00 0.57 0.00 0.57
19.20 2.00 0.56 5.00 0.57 0.00 0.57
19.25 2.00 0.56 5.00 0.57 0.00 0.57
19.30 2.00 0.56 5.00 0.57 0.00 0.57
19.35 2.00 0.56 5.00 0.57 0.00 0.57
19.40 2.00 0.56 5.00 0.57 0.00 0.57
19.45 2.00 0.56 5.00 0.57 0.00 0.57
19.50 2.00 0.56 5.00 0.57 0.00 0.57
19.55 2.00 0.56 5.00 0.57 0.00 0.57
19.60 2.00 0.56 5.00 0.57 0.00 0.57
19.65 2.00 0.56 5.00 0.57 0.00 0.57
19.70 2.00 0.56 5.00 0.57 0.00 0.57
19.75 2.00 0.56 5.00 0.57 0.00 0.57
19.80 2.00 0.56 5.00 0.57 0.00 0.57
19.85 2.00 0.56 5.00 0.57 0.00 0.57 151
Item # C5.
19.90 2.00 0.56 5.00 0.57 0.00 0.57
19.95 2.00 0.56 5.00 0.57 0.00 0.57
20.00 2.00 0.56 5.00 0.57 0.00 0.57
20.05 2.00 0.56 5.00 0.57 0.00 0.57
20.10 2.00 0.56 5.00 0.57 0.00 0.57
20.15 2.00 0.56 5.00 0.57 0.00 0.57
20.20 2.00 0.56 5.00 0.57 0.00 0.57
20.25 2.00 0.56 5.00 0.57 0.00 0.57
20.30 2.00 0.56 5.00 0.57 0.00 0.57
20.35 2.00 0.56 5.00 0.57 0.00 0.57
20.40 2.00 0.56 5.00 0.57 0.00 0.57
20.45 2.00 0.56 5.00 0.57 0.00 0.57
20.50 2.00 0.56 5.00 0.57 0.00 0.57
20.55 2.00 0.56 5.00 0.57 0.00 0.57
20.60 2.00 0.56 5.00 0.57 0.00 0.57
20.65 2.00 0.56 5.00 0.57 0.00 0.57
20.70 2.00 0.56 5.00 0.57 0.00 0.57
20.75 2.00 0.56 5.00 0.57 0.00 0.57
20.80 2.00 0.56 5.00 0.57 0.00 0.57
20.85 2.00 0.56 5.00 0.57 0.00 0.57
20.90 2.00 0.56 5.00 0.57 0.00 0.57
20.95 2.00 0.56 5.00 0.57 0.00 0.57
21.00 2.00 0.56 5.00 0.57 0.00 0.57
21.05 2.00 0.56 5.00 0.57 0.00 0.57
21.10 2.00 0.56 5.00 0.57 0.00 0.57
21.15 2.00 0.56 5.00 0.57 0.00 0.57
21.20 2.00 0.56 5.00 0.57 0.00 0.57
21.25 2.00 0.56 5.00 0.57 0.00 0.57
21.30 2.00 0.56 5.00 0.57 0.00 0.57
21.35 2.00 0.56 5.00 0.57 0.00 0.57
21.40 2.00 0.56 5.00 0.57 0.00 0.57
21.45 2.00 0.56 5.00 0.57 0.00 0.57
21.50 2.00 0.56 5.00 0.57 0.00 0.57
21.55 2.00 0.56 5.00 0.57 0.00 0.57
21.60 2.00 0.56 5.00 0.57 0.00 0.57
21.65 2.00 0.56 5.00 0.57 0.00 0.57
21.70 2.00 0.56 5.00 0.57 0.00 0.57
21.75 2.00 0.56 5.00 0.57 0.00 0.57
21.80 2.00 0.56 5.00 0.57 0.00 0.57
21.85 2.00 0.56 5.00 0.57 0.00 0.57
21.90 2.00 0.56 5.00 0.57 0.00 0.57
21.95 2.00 0.56 5.00 0.57 0.00 0.57
22.00 2.00 0.56 5.00 0.57 0.00 0.57
22.05 2.00 0.56 5.00 0.57 0.00 0.57
22.10 2.00 0.56 5.00 0.57 0.00 0.57
22.15 2.00 0.56 5.00 0.57 0.00 0.57
22.20 2.00 0.56 5.00 0.57 0.00 0.57
22.25 2.00 0.56 5.00 0.57 0.00 0.57
22.30 2.00 0.56 5.00 0.57 0.00 0.57
22.35 2.00 0.56 5.00 0.57 0.00 0.57
22.40 2.00 0.56 5.00 0.57 0.00 0.57
22.45 2.00 0.56 5.00 0.57 0.00 0.57
22.50 2.00 0.56 5.00 0.57 0.00 0.57
22.55 2.00 0.56 5.00 0.57 0.00 0.57
22.60 2.00 0.56 5.00 0.57 0.00 0.57
22.65 2.00 0.56 5.00 0.57 0.00 0.57
22.70 2.00 0.56 5.00 0.57 0.00 0.57
22.75 2.00 0.56 5.00 0.57 0.00 0.57
22.80 2.00 0.56 5.00 0.57 0.00 0.57
22.85 2.00 0.56 5.00 0.57 0.00 0.57
22.90 2.00 0.56 5.00 0.57 0.00 0.57
22.95 2.00 0.56 5.00 0.57 0.00 0.57
23.00 2.00 0.56 5.00 0.57 0.00 0.57
23.05 2.00 0.56 5.00 0.57 0.00 0.57
23.10 2.00 0.56 5.00 0.57 0.00 0.57
23.15 2.00 0.56 5.00 0.57 0.00 0.57
23.20 2.00 0.56 5.00 0.57 0.00 0.57
23.25 2.00 0.56 5.00 0.57 0.00 0.57
23.30 2.00 0.56 5.00 0.57 0.00 0.57
23.35 2.00 0.56 5.00 0.57 0.00 0.57
23.40 2.00 0.56 5.00 0.57 0.00 0.57
23.45 2.00 0.56 5.00 0.57 0.00 0.57
23.50 2.00 0.56 5.00 0.57 0.00 0.57
23.55 2.00 0.56 5.00 0.57 0.00 0.57
23.60 2.00 0.56 5.00 0.57 0.00 0.57 152
Item # C5.
23.65 2.00 0.56 5.00 0.57 0.00 0.57
23.70 2.00 0.56 5.00 0.57 0.00 0.57
23.75 2.00 0.56 5.00 0.57 0.00 0.57
23.80 2.00 0.56 5.00 0.57 0.00 0.57
23.85 2.00 0.56 5.00 0.57 0.00 0.57
23.90 2.00 0.56 5.00 0.57 0.00 0.57
23.95 2.00 0.56 5.00 0.57 0.00 0.57
24.00 2.00 0.56 5.00 0.57 0.00 0.57
24.05 2.00 0.56 5.00 0.57 0.00 0.57
24.10 2.00 0.56 5.00 0.57 0.00 0.57
24.15 2.00 0.56 5.00 0.57 0.00 0.57
24.20 2.00 0.56 5.00 0.57 0.00 0.57
24.25 2.00 0.56 5.00 0.57 0.00 0.57
24.30 2.00 0.56 5.00 0.57 0.00 0.57
24.35 2.00 0.56 5.00 0.57 0.00 0.57
24.40 2.00 0.56 5.00 0.57 0.00 0.57
24.45 2.00 0.56 5.00 0.57 0.00 0.57
24.50 2.00 0.56 5.00 0.57 0.00 0.57
24.55 2.00 0.56 5.00 0.57 0.00 0.57
24.60 2.00 0.56 5.00 0.57 0.00 0.57
24.65 2.00 0.56 5.00 0.57 0.00 0.57
24.70 2.00 0.56 5.00 0.57 0.00 0.57
24.75 2.00 0.55 5.00 0.57 0.00 0.57
24.80 2.00 0.55 5.00 0.57 0.00 0.57
24.85 2.00 0.55 5.00 0.57 0.00 0.57
24.90 2.00 0.55 5.00 0.57 0.00 0.57
24.95 2.00 0.55 5.00 0.57 0.00 0.57
25.00 2.00 0.55 5.00 0.57 0.00 0.57
25.05 2.00 0.55 5.00 0.57 0.00 0.57
25.10 2.00 0.55 5.00 0.57 0.00 0.57
25.15 2.00 0.55 5.00 0.57 0.00 0.57
25.20 2.00 0.55 5.00 0.57 0.00 0.57
25.25 2.00 0.55 5.00 0.57 0.00 0.57
25.30 2.00 0.55 5.00 0.57 0.00 0.57
25.35 2.00 0.55 5.00 0.57 0.00 0.57
25.40 2.00 0.55 5.00 0.57 0.00 0.57
25.45 2.00 0.55 5.00 0.57 0.00 0.57
25.50 2.00 0.55 5.00 0.57 0.00 0.57
25.55 2.00 0.55 5.00 0.57 0.00 0.57
25.60 2.00 0.55 5.00 0.57 0.00 0.57
25.65 2.00 0.55 5.00 0.57 0.00 0.57
25.70 2.00 0.55 5.00 0.57 0.00 0.57
25.75 2.00 0.55 5.00 0.57 0.00 0.57
25.80 2.00 0.55 5.00 0.57 0.00 0.57
25.85 2.00 0.55 5.00 0.57 0.00 0.57
25.90 2.00 0.55 5.00 0.57 0.00 0.57
25.95 2.00 0.55 5.00 0.57 0.00 0.57
26.00 2.00 0.55 5.00 0.57 0.00 0.57
26.05 2.00 0.55 5.00 0.57 0.00 0.57
26.10 2.00 0.55 5.00 0.57 0.00 0.57
26.15 2.00 0.55 5.00 0.57 0.00 0.57
26.20 2.00 0.55 5.00 0.57 0.00 0.57
26.25 2.00 0.55 5.00 0.57 0.00 0.57
26.30 2.00 0.55 5.00 0.57 0.00 0.57
26.35 2.00 0.55 5.00 0.57 0.00 0.57
26.40 2.00 0.55 5.00 0.57 0.00 0.57
26.45 2.00 0.55 5.00 0.57 0.00 0.57
26.50 2.00 0.55 5.00 0.57 0.00 0.57
26.55 2.00 0.55 5.00 0.57 0.00 0.57
26.60 2.00 0.55 5.00 0.57 0.00 0.57
26.65 2.00 0.55 5.00 0.57 0.00 0.57
26.70 2.00 0.55 5.00 0.57 0.00 0.57
26.75 2.00 0.55 5.00 0.57 0.00 0.57
26.80 2.00 0.55 5.00 0.57 0.00 0.57
26.85 2.00 0.55 5.00 0.57 0.00 0.57
26.90 2.00 0.55 5.00 0.57 0.00 0.57
26.95 2.00 0.55 5.00 0.57 0.00 0.57
27.00 2.00 0.55 5.00 0.57 0.00 0.57
27.05 2.00 0.55 5.00 0.57 0.00 0.57
27.10 2.00 0.55 5.00 0.57 0.00 0.57
27.15 2.00 0.55 5.00 0.57 0.00 0.57
27.20 2.00 0.55 5.00 0.57 0.00 0.57
27.25 2.00 0.55 5.00 0.57 0.00 0.57
27.30 2.00 0.55 5.00 0.57 0.00 0.57
27.35 2.00 0.55 5.00 0.57 0.00 0.57 153
Item # C5.
27.40 2.00 0.55 5.00 0.57 0.00 0.57
27.45 2.00 0.55 5.00 0.57 0.00 0.57
27.50 2.00 0.55 5.00 0.57 0.00 0.57
27.55 2.00 0.55 5.00 0.57 0.00 0.57
27.60 2.00 0.55 5.00 0.57 0.00 0.57
27.65 2.00 0.55 5.00 0.57 0.00 0.57
27.70 2.00 0.55 5.00 0.57 0.00 0.57
27.75 2.00 0.55 5.00 0.57 0.00 0.57
27.80 2.00 0.55 5.00 0.57 0.00 0.57
27.85 2.00 0.55 5.00 0.57 0.00 0.57
27.90 2.00 0.55 5.00 0.57 0.00 0.57
27.95 2.00 0.55 5.00 0.57 0.00 0.57
28.00 2.00 0.55 5.00 0.57 0.00 0.57
28.05 2.00 0.55 5.00 0.57 0.00 0.57
28.10 2.00 0.55 5.00 0.57 0.00 0.57
28.15 2.00 0.55 5.00 0.57 0.00 0.57
28.20 2.00 0.55 5.00 0.57 0.00 0.57
28.25 2.00 0.55 5.00 0.57 0.00 0.57
28.30 2.00 0.55 5.00 0.57 0.00 0.57
28.35 2.00 0.55 5.00 0.57 0.00 0.57
28.40 2.00 0.55 5.00 0.57 0.00 0.57
28.45 2.00 0.55 5.00 0.57 0.00 0.57
28.50 2.00 0.55 5.00 0.57 0.00 0.57
28.55 2.00 0.55 5.00 0.57 0.00 0.57
28.60 2.00 0.55 5.00 0.57 0.00 0.57
28.65 2.00 0.55 5.00 0.57 0.00 0.57
28.70 2.00 0.55 5.00 0.57 0.00 0.57
28.75 2.00 0.55 5.00 0.57 0.00 0.57
28.80 2.00 0.55 5.00 0.57 0.00 0.57
28.85 2.00 0.55 5.00 0.57 0.00 0.57
28.90 2.00 0.55 5.00 0.57 0.00 0.57
28.95 2.00 0.55 5.00 0.57 0.00 0.57
29.00 2.00 0.55 5.00 0.57 0.00 0.57
29.05 2.00 0.55 5.00 0.57 0.00 0.57
29.10 2.00 0.55 5.00 0.57 0.00 0.57
29.15 2.00 0.55 5.00 0.57 0.00 0.57
29.20 2.00 0.55 5.00 0.57 0.00 0.57
29.25 2.00 0.55 5.00 0.57 0.00 0.57
29.30 2.00 0.55 5.00 0.57 0.00 0.57
29.35 2.00 0.55 5.00 0.57 0.00 0.57
29.40 2.00 0.55 5.00 0.57 0.00 0.57
29.45 2.00 0.55 5.00 0.57 0.00 0.57
29.50 2.00 0.55 5.00 0.57 0.00 0.57
29.55 2.00 0.55 5.00 0.57 0.00 0.57
29.60 2.00 0.55 5.00 0.57 0.00 0.57
29.65 2.00 0.55 5.00 0.57 0.00 0.57
29.70 2.00 0.55 5.00 0.57 0.00 0.57
29.75 2.00 0.55 5.00 0.57 0.00 0.57
29.80 2.00 0.55 5.00 0.57 0.00 0.57
29.85 2.00 0.55 5.00 0.57 0.00 0.57
29.90 2.00 0.55 5.00 0.57 0.00 0.57
29.95 2.00 0.55 5.00 0.57 0.00 0.57
30.00 2.00 0.55 5.00 0.57 0.00 0.57
30.05 2.00 0.55 5.00 0.57 0.00 0.57
30.10 2.00 0.55 5.00 0.57 0.00 0.57
30.15 2.00 0.55 5.00 0.57 0.00 0.57
30.20 2.00 0.55 5.00 0.57 0.00 0.57
30.25 2.00 0.55 5.00 0.57 0.00 0.57
30.30 2.00 0.55 5.00 0.57 0.00 0.57
30.35 2.00 0.55 5.00 0.57 0.00 0.57
30.40 2.00 0.55 5.00 0.57 0.00 0.57
30.45 2.00 0.55 5.00 0.57 0.00 0.57
30.50 2.00 0.55 5.00 0.57 0.00 0.57
30.55 2.00 0.55 5.00 0.57 0.00 0.57
30.60 2.00 0.54 5.00 0.57 0.00 0.57
30.65 2.00 0.54 5.00 0.57 0.00 0.57
30.70 2.00 0.54 5.00 0.57 0.00 0.57
30.75 2.00 0.54 5.00 0.57 0.00 0.57
30.80 2.00 0.54 5.00 0.57 0.00 0.57
30.85 2.00 0.54 5.00 0.57 0.00 0.57
30.90 2.00 0.54 5.00 0.57 0.00 0.57
30.95 2.00 0.54 5.00 0.57 0.00 0.57
31.00 2.00 0.54 5.00 0.57 0.00 0.57
31.05 2.00 0.54 5.00 0.57 0.00 0.57
31.10 2.00 0.54 5.00 0.57 0.00 0.57 154
Item # C5.
31.15 2.00 0.54 5.00 0.57 0.00 0.57
31.20 2.00 0.54 5.00 0.57 0.00 0.57
31.25 2.00 0.54 5.00 0.57 0.00 0.57
31.30 2.00 0.54 5.00 0.57 0.00 0.57
31.35 2.00 0.54 5.00 0.57 0.00 0.57
31.40 2.00 0.54 5.00 0.57 0.00 0.57
31.45 2.00 0.54 5.00 0.57 0.00 0.57
31.50 2.00 0.54 5.00 0.57 0.00 0.57
31.55 2.00 0.54 5.00 0.57 0.00 0.57
31.60 2.00 0.54 5.00 0.57 0.00 0.57
31.65 2.00 0.54 5.00 0.57 0.00 0.57
31.70 2.00 0.54 5.00 0.57 0.00 0.57
31.75 2.00 0.54 5.00 0.57 0.00 0.57
31.80 2.00 0.54 5.00 0.57 0.00 0.57
31.85 2.00 0.54 5.00 0.57 0.00 0.57
31.90 2.00 0.54 5.00 0.57 0.00 0.57
31.95 2.00 0.54 5.00 0.57 0.00 0.57
32.00 2.00 0.54 5.00 0.57 0.00 0.57
32.05 2.00 0.54 5.00 0.57 0.00 0.57
32.10 2.00 0.54 5.00 0.57 0.00 0.57
32.15 2.00 0.54 5.00 0.57 0.00 0.57
32.20 2.00 0.54 5.00 0.57 0.00 0.57
32.25 2.00 0.54 5.00 0.57 0.00 0.57
32.30 2.00 0.54 5.00 0.57 0.00 0.57
32.35 2.00 0.54 5.00 0.57 0.00 0.57
32.40 2.00 0.54 5.00 0.57 0.00 0.57
32.45 2.00 0.54 5.00 0.57 0.00 0.57
32.50 2.00 0.54 5.00 0.57 0.00 0.57
32.55 2.00 0.54 5.00 0.57 0.00 0.57
32.60 2.00 0.54 5.00 0.57 0.00 0.57
32.65 2.00 0.53 5.00 0.57 0.00 0.57
32.70 2.00 0.53 5.00 0.57 0.00 0.57
32.75 2.00 0.53 5.00 0.57 0.00 0.57
32.80 2.00 0.53 5.00 0.57 0.00 0.57
32.85 2.00 0.53 5.00 0.57 0.00 0.57
32.90 2.00 0.53 5.00 0.57 0.00 0.57
32.95 2.00 0.53 5.00 0.57 0.00 0.57
33.00 2.00 0.53 5.00 0.57 0.00 0.57
33.05 2.00 0.53 5.00 0.57 0.00 0.57
33.10 2.00 0.53 5.00 0.57 0.00 0.57
33.15 2.00 0.53 5.00 0.57 0.00 0.57
33.20 2.00 0.53 5.00 0.57 0.00 0.57
33.25 2.00 0.53 5.00 0.57 0.00 0.57
33.30 2.00 0.53 5.00 0.57 0.00 0.57
33.35 2.00 0.53 5.00 0.57 0.00 0.57
33.40 2.00 0.53 5.00 0.57 0.00 0.57
33.45 2.00 0.53 5.00 0.57 0.00 0.57
33.50 2.00 0.53 5.00 0.57 0.00 0.57
33.55 2.00 0.53 5.00 0.57 0.00 0.57
33.60 2.00 0.53 5.00 0.57 0.00 0.57
33.65 2.00 0.54 5.00 0.57 0.00 0.57
33.70 2.00 0.54 5.00 0.57 0.00 0.57
33.75 2.00 0.54 5.00 0.57 0.00 0.57
33.80 2.00 0.54 5.00 0.57 0.00 0.57
33.85 2.00 0.54 5.00 0.57 0.00 0.57
33.90 2.00 0.54 5.00 0.57 0.00 0.57
33.95 2.00 0.54 5.00 0.57 0.00 0.57
34.00 2.00 0.54 5.00 0.57 0.00 0.57
34.05 2.00 0.54 5.00 0.57 0.00 0.57
34.10 2.00 0.54 5.00 0.57 0.00 0.57
34.15 2.00 0.54 5.00 0.57 0.00 0.57
34.20 2.00 0.54 5.00 0.57 0.00 0.57
34.25 2.00 0.54 5.00 0.57 0.00 0.57
34.30 2.00 0.54 5.00 0.57 0.00 0.57
34.35 2.00 0.54 5.00 0.57 0.00 0.57
34.40 2.00 0.54 5.00 0.57 0.00 0.57
34.45 2.00 0.54 5.00 0.57 0.00 0.57
34.50 2.00 0.54 5.00 0.57 0.00 0.57
34.55 2.00 0.54 5.00 0.57 0.00 0.57
34.60 2.00 0.54 5.00 0.57 0.00 0.57
34.65 2.00 0.54 5.00 0.57 0.00 0.57
34.70 2.00 0.54 5.00 0.57 0.00 0.57
34.75 2.00 0.54 5.00 0.57 0.00 0.57
34.80 2.00 0.54 5.00 0.57 0.00 0.57
34.85 2.00 0.54 5.00 0.57 0.00 0.57 155
Item # C5.
34.90 2.00 0.54 5.00 0.57 0.00 0.57
34.95 2.00 0.54 5.00 0.57 0.00 0.57
35.00 2.00 0.54 5.00 0.57 0.00 0.57
35.05 2.00 0.54 5.00 0.57 0.00 0.57
35.10 2.00 0.54 5.00 0.57 0.00 0.57
35.15 2.00 0.54 5.00 0.57 0.00 0.57
35.20 2.00 0.54 5.00 0.57 0.00 0.57
35.25 2.00 0.54 5.00 0.57 0.00 0.57
35.30 2.00 0.54 5.00 0.57 0.00 0.57
35.35 2.00 0.54 5.00 0.57 0.00 0.57
35.40 2.00 0.54 5.00 0.57 0.00 0.57
35.45 2.00 0.54 5.00 0.57 0.00 0.57
35.50 2.00 0.54 5.00 0.57 0.00 0.57
35.55 2.00 0.54 5.00 0.57 0.00 0.57
35.60 2.00 0.54 5.00 0.57 0.00 0.57
35.65 2.00 0.54 5.00 0.57 0.00 0.57
35.70 2.00 0.54 5.00 0.57 0.00 0.57
35.75 2.00 0.54 5.00 0.57 0.00 0.57
35.80 2.00 0.54 5.00 0.57 0.00 0.57
35.85 2.00 0.54 5.00 0.57 0.00 0.57
35.90 2.00 0.54 5.00 0.57 0.00 0.57
35.95 2.00 0.54 5.00 0.57 0.00 0.57
36.00 2.00 0.54 5.00 0.57 0.00 0.57
36.05 2.00 0.54 5.00 0.57 0.00 0.57
36.10 2.00 0.54 5.00 0.57 0.00 0.57
36.15 2.00 0.54 5.00 0.57 0.00 0.57
36.20 2.00 0.54 5.00 0.57 0.00 0.57
36.25 2.00 0.54 5.00 0.57 0.00 0.57
36.30 2.00 0.54 5.00 0.57 0.00 0.57
36.35 2.00 0.54 5.00 0.57 0.00 0.57
36.40 2.00 0.54 5.00 0.57 0.00 0.57
36.45 2.00 0.54 5.00 0.57 0.00 0.57
36.50 2.00 0.54 5.00 0.57 0.00 0.57
36.55 2.00 0.54 5.00 0.57 0.00 0.57
36.60 2.00 0.54 5.00 0.57 0.00 0.57
36.65 2.00 0.54 5.00 0.57 0.00 0.57
36.70 2.00 0.54 5.00 0.57 0.00 0.57
36.75 2.00 0.54 5.00 0.57 0.00 0.57
36.80 2.00 0.54 5.00 0.57 0.00 0.57
36.85 2.00 0.54 5.00 0.57 0.00 0.57
36.90 2.00 0.54 5.00 0.57 0.00 0.57
36.95 2.00 0.54 5.00 0.57 0.00 0.57
37.00 2.00 0.54 5.00 0.57 0.00 0.57
37.05 2.00 0.54 5.00 0.57 0.00 0.57
37.10 2.00 0.54 5.00 0.57 0.00 0.57
37.15 2.00 0.54 5.00 0.57 0.00 0.57
37.20 2.00 0.54 5.00 0.57 0.00 0.57
37.25 2.00 0.54 5.00 0.57 0.00 0.57
37.30 2.00 0.54 5.00 0.57 0.00 0.57
37.35 2.00 0.55 5.00 0.57 0.00 0.57
37.40 2.00 0.55 5.00 0.57 0.00 0.57
37.45 2.00 0.55 5.00 0.57 0.00 0.57
37.50 2.00 0.55 5.00 0.57 0.00 0.57
37.55 2.00 0.55 5.00 0.57 0.00 0.57
37.60 2.00 0.55 5.00 0.57 0.00 0.57
37.65 2.00 0.55 5.00 0.57 0.00 0.57
37.70 2.00 0.55 5.00 0.57 0.00 0.57
37.75 2.00 0.55 5.00 0.57 0.00 0.57
37.80 2.00 0.55 5.00 0.57 0.00 0.57
37.85 2.00 0.55 5.00 0.57 0.00 0.57
37.90 2.00 0.55 5.00 0.57 0.00 0.57
37.95 2.00 0.55 5.00 0.57 0.00 0.57
38.00 2.00 0.55 5.00 0.57 0.00 0.57
38.05 2.00 0.55 5.00 0.57 0.00 0.57
38.10 2.00 0.55 5.00 0.57 0.00 0.57
38.15 2.00 0.55 5.00 0.57 0.00 0.57
38.20 2.00 0.55 5.00 0.57 0.00 0.57
38.25 2.00 0.55 5.00 0.57 0.00 0.57
38.30 2.00 0.55 5.00 0.57 0.00 0.57
38.35 2.00 0.55 5.00 0.57 0.00 0.57
38.40 2.00 0.55 5.00 0.57 0.00 0.57
38.45 2.00 0.55 5.00 0.57 0.00 0.57
38.50 2.00 0.55 5.00 0.57 0.00 0.57
38.55 2.00 0.55 5.00 0.57 0.00 0.57
38.60 2.00 0.55 5.00 0.57 0.00 0.57 156
Item # C5.
38.65 2.00 0.55 5.00 0.57 0.00 0.57
38.70 2.00 0.55 5.00 0.57 0.00 0.57
38.75 2.00 0.55 5.00 0.57 0.00 0.57
38.80 2.00 0.55 5.00 0.57 0.00 0.57
38.85 2.00 0.55 5.00 0.57 0.00 0.57
38.90 2.00 0.55 5.00 0.57 0.00 0.57
38.95 2.00 0.55 5.00 0.57 0.00 0.57
39.00 2.00 0.55 5.00 0.57 0.00 0.57
39.05 2.00 0.55 5.00 0.57 0.00 0.57
39.10 2.00 0.55 5.00 0.57 0.00 0.57
39.15 2.00 0.55 5.00 0.57 0.00 0.57
39.20 2.00 0.55 5.00 0.57 0.00 0.57
39.25 2.00 0.55 5.00 0.57 0.00 0.57
39.30 2.00 0.55 5.00 0.57 0.00 0.57
39.35 2.00 0.55 5.00 0.57 0.00 0.57
39.40 2.00 0.55 5.00 0.57 0.00 0.57
39.45 2.00 0.55 5.00 0.57 0.00 0.57
39.50 2.00 0.55 5.00 0.57 0.00 0.57
39.55 2.00 0.55 5.00 0.57 0.00 0.57
39.60 2.00 0.55 5.00 0.57 0.00 0.57
39.65 2.00 0.55 5.00 0.57 0.00 0.57
39.70 2.00 0.55 5.00 0.57 0.00 0.57
39.75 2.00 0.55 5.00 0.57 0.00 0.57
39.80 2.00 0.55 5.00 0.57 0.00 0.57
39.85 2.00 0.55 5.00 0.57 0.00 0.57
39.90 2.00 0.55 5.00 0.57 0.00 0.57
39.95 2.00 0.55 5.00 0.57 0.00 0.57
40.00 2.00 0.55 5.00 0.57 0.00 0.57
40.05 0.48 0.55 0.87* 0.57 0.00 0.57
40.10 0.47 0.55 0.86* 0.56 0.00 0.56
40.15 0.47 0.55 0.86* 0.56 0.00 0.56
40.20 0.47 0.55 0.86* 0.55 0.00 0.55
40.25 0.47 0.55 0.86* 0.55 0.00 0.55
40.30 0.47 0.55 0.86* 0.55 0.00 0.55
40.35 0.47 0.55 0.86* 0.54 0.00 0.54
40.40 0.47 0.55 0.85* 0.54 0.00 0.54
40.45 0.47 0.55 0.85* 0.53 0.00 0.53
40.50 0.47 0.55 0.85* 0.53 0.00 0.53
40.55 0.47 0.55 0.85* 0.52 0.00 0.52
40.60 0.47 0.55 0.85* 0.52 0.00 0.52
40.65 0.47 0.55 0.85* 0.51 0.00 0.51
40.70 0.46 0.55 0.85* 0.51 0.00 0.51
40.75 0.46 0.55 0.84* 0.50 0.00 0.50
40.80 0.46 0.55 0.84* 0.50 0.00 0.50
40.85 0.46 0.55 0.84* 0.49 0.00 0.49
40.90 0.46 0.55 0.84* 0.49 0.00 0.49
40.95 0.46 0.55 0.84* 0.48 0.00 0.48
41.00 0.46 0.55 0.84* 0.48 0.00 0.48
41.05 0.46 0.55 0.84* 0.47 0.00 0.47
41.10 0.46 0.55 0.83* 0.47 0.00 0.47
41.15 0.46 0.55 0.83* 0.46 0.00 0.46
41.20 0.46 0.55 0.83* 0.46 0.00 0.46
41.25 0.46 0.55 0.83* 0.45 0.00 0.45
41.30 0.46 0.55 0.83* 0.45 0.00 0.45
41.35 0.46 0.55 0.83* 0.44 0.00 0.44
41.40 0.45 0.55 0.83* 0.44 0.00 0.44
41.45 0.45 0.55 0.82* 0.43 0.00 0.43
41.50 0.45 0.55 0.82* 0.43 0.00 0.43
41.55 0.45 0.55 0.82* 0.42 0.00 0.42
41.60 0.45 0.55 0.82* 0.42 0.00 0.42
41.65 0.45 0.55 0.82* 0.41 0.00 0.41
41.70 0.45 0.55 0.82* 0.41 0.00 0.41
41.75 0.45 0.55 0.82* 0.40 0.00 0.40
41.80 0.45 0.55 0.82* 0.40 0.00 0.40
41.85 0.45 0.55 0.81* 0.39 0.00 0.39
41.90 0.45 0.55 0.81* 0.39 0.00 0.39
41.95 0.45 0.55 0.81* 0.38 0.00 0.38
42.00 0.45 0.55 0.81* 0.38 0.00 0.38
42.05 0.45 0.55 0.81* 0.37 0.00 0.37
42.10 0.45 0.55 0.81* 0.36 0.00 0.36
42.15 0.45 0.55 0.81* 0.36 0.00 0.36
42.20 0.44 0.55 0.81* 0.35 0.00 0.35
42.25 0.44 0.55 0.81* 0.35 0.00 0.35
42.30 0.44 0.55 0.80* 0.34 0.00 0.34
42.35 0.44 0.55 0.80* 0.34 0.00 0.34 157
Item # C5.
42.40 0.44 0.55 0.80* 0.33 0.00 0.33
42.45 0.44 0.55 0.80* 0.33 0.00 0.33
42.50 0.44 0.55 0.80* 0.32 0.00 0.32
42.55 0.44 0.55 0.80* 0.32 0.00 0.32
42.60 0.44 0.55 0.80* 0.31 0.00 0.31
42.65 0.44 0.55 0.80* 0.30 0.00 0.30
42.70 0.44 0.55 0.80* 0.30 0.00 0.30
42.75 0.44 0.55 0.79* 0.29 0.00 0.29
42.80 0.44 0.55 0.79* 0.29 0.00 0.29
42.85 0.44 0.55 0.79* 0.28 0.00 0.28
42.90 0.44 0.55 0.79* 0.28 0.00 0.28
42.95 0.44 0.55 0.79* 0.27 0.00 0.27
43.00 0.44 0.55 0.79* 0.26 0.00 0.26
43.05 0.43 0.55 0.79* 0.26 0.00 0.26
43.10 0.43 0.55 0.79* 0.25 0.00 0.25
43.15 0.43 0.55 0.79* 0.25 0.00 0.25
43.20 0.43 0.55 0.78* 0.24 0.00 0.24
43.25 0.43 0.55 0.78* 0.24 0.00 0.24
43.30 0.43 0.55 0.78* 0.23 0.00 0.23
43.35 0.43 0.55 0.78* 0.22 0.00 0.22
43.40 0.43 0.55 0.78* 0.22 0.00 0.22
43.45 0.43 0.55 0.78* 0.21 0.00 0.21
43.50 0.43 0.55 0.78* 0.21 0.00 0.21
43.55 0.43 0.55 0.78* 0.20 0.00 0.20
43.60 0.43 0.55 0.78* 0.19 0.00 0.19
43.65 0.43 0.55 0.78* 0.19 0.00 0.19
43.70 0.43 0.55 0.77* 0.18 0.00 0.18
43.75 0.43 0.55 0.77* 0.18 0.00 0.18
43.80 0.43 0.55 0.77* 0.17 0.00 0.17
43.85 0.43 0.55 0.77* 0.16 0.00 0.16
43.90 0.43 0.55 0.77* 0.16 0.00 0.16
43.95 0.42 0.55 0.77* 0.15 0.00 0.15
44.00 0.42 0.55 0.77* 0.15 0.00 0.15
44.05 0.42 0.55 0.77* 0.14 0.00 0.14
44.10 0.42 0.55 0.77* 0.13 0.00 0.13
44.15 0.42 0.55 0.77* 0.13 0.00 0.13
44.20 0.42 0.55 0.76* 0.12 0.00 0.12
44.25 0.42 0.55 0.76* 0.12 0.00 0.12
44.30 0.42 0.55 0.76* 0.11 0.00 0.11
44.35 0.42 0.55 0.76* 0.10 0.00 0.10
44.40 0.42 0.55 0.76* 0.10 0.00 0.10
44.45 0.42 0.55 0.76* 0.09 0.00 0.09
44.50 0.42 0.55 0.76* 0.08 0.00 0.08
44.55 0.42 0.55 0.76* 0.08 0.00 0.08
44.60 0.42 0.55 0.76* 0.07 0.00 0.07
44.65 0.42 0.55 0.76* 0.06 0.00 0.06
44.70 0.42 0.55 0.76* 0.06 0.00 0.06
44.75 0.42 0.55 0.76* 0.05 0.00 0.05
44.80 0.42 0.55 0.75* 0.05 0.00 0.05
44.85 0.42 0.55 0.75* 0.04 0.00 0.04
44.90 0.42 0.55 0.75* 0.03 0.00 0.03
44.95 0.41 0.55 0.75* 0.03 0.00 0.03
45.00 0.41 0.55 0.75* 0.02 0.00 0.02
45.05 0.44 0.55 0.80* 0.01 0.00 0.01
45.10 0.47 0.55 0.86* 0.01 0.00 0.01
45.15 0.54 0.55 0.99* 0.00 0.00 0.00
45.20 0.62 0.55 1.13 0.00 0.00 0.00
45.25 0.62 0.55 1.13 0.00 0.00 0.00
45.30 0.62 0.55 1.13 0.00 0.00 0.00
45.35 0.62 0.55 1.13 0.00 0.00 0.00
45.40 0.62 0.55 1.13 0.00 0.00 0.00
45.45 0.62 0.55 1.13 0.00 0.00 0.00
45.50 0.62 0.55 1.13 0.00 0.00 0.00
45.55 0.62 0.55 1.13 0.00 0.00 0.00
45.60 0.62 0.55 1.13 0.00 0.00 0.00
45.65 0.62 0.55 1.13 0.00 0.00 0.00
45.70 0.62 0.55 1.13 0.00 0.00 0.00
45.75 0.62 0.55 1.13 0.00 0.00 0.00
45.80 0.62 0.55 1.13 0.00 0.00 0.00
45.85 0.62 0.55 1.13 0.00 0.00 0.00
45.90 0.62 0.55 1.13 0.00 0.00 0.00
45.95 0.62 0.55 1.13 0.00 0.00 0.00
46.00 0.62 0.55 1.13 0.00 0.00 0.00
46.05 0.62 0.55 1.13 0.00 0.00 0.00
46.10 0.62 0.55 1.13 0.00 0.00 0.00 158
Item # C5.
46.15 0.62 0.55 1.13 0.00 0.00 0.00
46.20 0.62 0.55 1.13 0.00 0.00 0.00
46.25 0.62 0.55 1.13 0.00 0.00 0.00
46.30 0.62 0.55 1.13 0.00 0.00 0.00
46.35 0.62 0.55 1.13 0.00 0.00 0.00
46.40 0.62 0.55 1.13 0.00 0.00 0.00
46.45 0.62 0.55 1.13 0.00 0.00 0.00
46.50 0.62 0.55 1.13 0.00 0.00 0.00
46.55 0.62 0.55 1.13 0.00 0.00 0.00
46.60 0.62 0.55 1.13 0.00 0.00 0.00
46.65 0.62 0.55 1.13 0.00 0.00 0.00
46.70 0.62 0.55 1.13 0.00 0.00 0.00
46.75 0.62 0.55 1.13 0.00 0.00 0.00
46.80 0.62 0.55 1.13 0.00 0.00 0.00
46.85 0.62 0.55 1.13 0.00 0.00 0.00
46.90 0.62 0.55 1.13 0.00 0.00 0.00
46.95 0.62 0.55 1.13 0.00 0.00 0.00
47.00 0.62 0.55 1.13 0.00 0.00 0.00
47.05 0.62 0.55 1.13 0.00 0.00 0.00
47.10 0.62 0.55 1.13 0.00 0.00 0.00
47.15 0.62 0.55 1.13 0.00 0.00 0.00
47.20 0.62 0.55 1.13 0.00 0.00 0.00
47.25 0.62 0.55 1.13 0.00 0.00 0.00
47.30 0.62 0.55 1.13 0.00 0.00 0.00
47.35 0.62 0.55 1.13 0.00 0.00 0.00
47.40 0.62 0.55 1.13 0.00 0.00 0.00
47.45 0.62 0.55 1.13 0.00 0.00 0.00
47.50 0.62 0.55 1.13 0.00 0.00 0.00
47.55 0.62 0.55 1.13 0.00 0.00 0.00
47.60 0.62 0.55 1.13 0.00 0.00 0.00
47.65 0.62 0.55 1.13 0.00 0.00 0.00
47.70 0.62 0.55 1.13 0.00 0.00 0.00
47.75 0.62 0.55 1.13 0.00 0.00 0.00
47.80 0.62 0.55 1.13 0.00 0.00 0.00
47.85 0.62 0.55 1.13 0.00 0.00 0.00
47.90 0.62 0.55 1.13 0.00 0.00 0.00
47.95 0.62 0.55 1.13 0.00 0.00 0.00
48.00 0.62 0.55 1.13 0.00 0.00 0.00
48.05 0.62 0.55 1.13 0.00 0.00 0.00
48.10 0.62 0.55 1.13 0.00 0.00 0.00
48.15 0.62 0.55 1.13 0.00 0.00 0.00
48.20 0.62 0.55 1.13 0.00 0.00 0.00
48.25 0.62 0.55 1.13 0.00 0.00 0.00
48.30 0.62 0.55 1.13 0.00 0.00 0.00
48.35 0.62 0.55 1.13 0.00 0.00 0.00
48.40 0.62 0.55 1.13 0.00 0.00 0.00
48.45 0.62 0.55 1.13 0.00 0.00 0.00
48.50 0.62 0.55 1.13 0.00 0.00 0.00
48.55 0.62 0.55 1.13 0.00 0.00 0.00
48.60 0.62 0.55 1.13 0.00 0.00 0.00
48.65 0.62 0.55 1.13 0.00 0.00 0.00
48.70 0.62 0.55 1.13 0.00 0.00 0.00
48.75 0.62 0.55 1.13 0.00 0.00 0.00
48.80 0.62 0.55 1.13 0.00 0.00 0.00
48.85 0.62 0.55 1.13 0.00 0.00 0.00
48.90 0.62 0.55 1.13 0.00 0.00 0.00
48.95 0.62 0.55 1.13 0.00 0.00 0.00
49.00 0.62 0.55 1.13 0.00 0.00 0.00
49.05 0.62 0.55 1.13 0.00 0.00 0.00
49.10 0.62 0.55 1.13 0.00 0.00 0.00
49.15 0.62 0.55 1.13 0.00 0.00 0.00
49.20 0.62 0.55 1.13 0.00 0.00 0.00
49.25 0.62 0.55 1.13 0.00 0.00 0.00
49.30 0.62 0.55 1.13 0.00 0.00 0.00
49.35 0.62 0.55 1.13 0.00 0.00 0.00
49.40 0.62 0.55 1.13 0.00 0.00 0.00
49.45 0.62 0.55 1.13 0.00 0.00 0.00
49.50 0.62 0.55 1.13 0.00 0.00 0.00
49.55 0.62 0.55 1.13 0.00 0.00 0.00
49.60 0.62 0.55 1.13 0.00 0.00 0.00
49.65 0.62 0.55 1.13 0.00 0.00 0.00
49.70 0.62 0.55 1.13 0.00 0.00 0.00
49.75 0.62 0.55 1.13 0.00 0.00 0.00
49.80 0.62 0.55 1.13 0.00 0.00 0.00
49.85 0.62 0.55 1.13 0.00 0.00 0.00 159
Item # C5.
49.90 0.62 0.55 1.13 0.00 0.00 0.00
49.95 0.62 0.55 1.13 0.00 0.00 0.00
50.00 0.62 0.55 1.13 0.00 0.00 0.00
50.05 0.62 0.55 1.13 0.00 0.00 0.00
50.10 0.62 0.55 1.13 0.00 0.00 0.00
50.15 0.62 0.55 1.13 0.00 0.00 0.00
50.20 0.62 0.55 1.13 0.00 0.00 0.00
50.25 0.62 0.55 1.13 0.00 0.00 0.00
50.30 0.62 0.55 1.13 0.00 0.00 0.00
50.35 0.62 0.55 1.13 0.00 0.00 0.00
50.40 0.62 0.55 1.13 0.00 0.00 0.00
50.45 0.62 0.55 1.13 0.00 0.00 0.00
50.50 0.62 0.55 1.13 0.00 0.00 0.00
_______________________________________________________ * F.S.<1, Liquefaction Potential Zone
(F.S. is limited to 5, CRR is limited to 2, CSR is limited to 2) Units: Unit: qc, fs, Stress or Pressure = atm (1.0581tsf); Unit Weight = pcf; Depth = ft; Settlement = in.
____________________________________________________________________________________ 1 atm (atmosphere) = 1 tsf (ton/ft2)
CRRm Cyclic resistance ratio from soils
CSRsf Cyclic stress ratio induced by a given earthquake (with user request factor of safety)
F.S. Factor of Safety against liquefaction, F.S.=CRRm/CSRsf S_sat Settlement from saturated sands
S_dry Settlement from Unsaturated Sands
S_all Total Settlement from Saturated and Unsaturated Sands NoLiq No-Liquefy Soils
160
Item # C5.
CITY OF MILPITAS
AGENDA REPORT
(AR)
Item Title: Approve and Authorize the City Manager to Execute a Stormwater Management Facilities Operation & Maintenance Agreement for Robinson Oil Corporation at 1787 South Main Street (Staff Contact: Steve Erickson, Engineering Director/City Engineer 408-586-3301)
Category: Consent Calendar-Community Development
Meeting
Date:
4/19/2022
Recommendation: Approve and authorize the City Manager to execute a Stormwater Management Facilities Operation and Maintenance Agreement for Robinson Oil Corporation for the Gas Station and Convenience Store Project at 1787 South Main Street.
Background:
On October 25, 2017, the Planning Commission approved Site Development Permit No. SD16-0007, Conditional Use Permit No. UP17-0026, and Variance No. VA17-0002 allowing the development of the Property, including the construction of a 3,780 square foot canopy structure over the fuel dispensers, a new trash enclosure, offsite and onsite improvements , landscaping, irrigation , and stormwater treatment measures on a 0.68-acre site located at 1787 South Main Street.
In accordance with State Law and the City’s Municipal Regional Stormwater NPDES Permit (“MRP”) issued by the Regional Water Quality Control Board (“RWQCB”), new development and redevelopment projects that create and/or replace 10,000 square feet or more of impervious surface are required to incorporate Low Impact Development (“LID”) post construction stormwater control measures into the project. LID control measures include, for example, bioretention areas, flow-through planters, permeable pavement, infiltration trenches and tree well filters.
Analysis:
MRP section C.3.h.ii.(1)(a) and Milpitas Municipal Code Title XI Chapter 16 require development project property owners meeting the 10,000 square foot threshold to execute and record a Stormwater Management Facilities Operation and Maintenance Agreement (“Agreement”) with the City for the perpetual operation, maintenance, and annual inspection of the LID stormwater treatment facilities (Attachment 1).
The Robben Robbie Gas Station #66 project constructed stormwater Bio-treatment devices and Robinson Oil Corporation will be responsible for the perpetual maintenance and operation of the bio-treatment areas specified in Agreement. Robinson Oil Corporation has executed the required Agreement which has been reviewed by the City Attorney as to form and by the City Engineer as to content.
Policy Alternatives:
Alternative 1:
Not approve the Operations and Maintenance Agreement with the City for operation, maintenance and annual inspection of stormwater treatment facilities.
Pros: None
Cons: Not approving the Agreement would cause the project to be not in compliance with the conditions of development and the City’s Municipal Code and would be prohibitive by federal and state law. 161 Item # C6.
Reason not recommended: To comply with Federal and State law and to allow for the on-going maintenance and City annual inspection of installed stormwater Bio-treatment devices, staff recommends approval of the Agreement.
Fiscal Impact:
As required by the Stormwater Management Facilities Operation and Maintenance Agreement, the project developer/owner will pay the City for the required annual inspections of the installed stormwater Bio-treatment facilities in accordance with the requirements of Regional Water Quality Control Board (“RWQCB”).
California Environmental Quality Act:
The City Council’s approval of the agreement was already reviewed under the California Environmental Quality Act (CEQA) at the time the City Council approved the entitlements for the project thru an initial environmental assessment. The Planning Division completed an environmental assessment for the project in accordance with the California Environmental Quality Act (CEQA), which assessment determined that the proposed project is exempt from further CEQA review, pursuant to State CEQA Guidelines Section 153 02 for “Replacement and Reconstruction,” as project consists of a service station, fuel dispensers, canopy structure, parking lot, trash enclosure and landscape, similar to the property’s previous use as a service station and auto repair establishment. The project is also exempt under State CEQA Guidelines Section 15303 for “New Construction or Conversion of Small Structures,” as the project is construction of a commercial use not exceeding 10,000 square feet in floor area in an urbanized area and does not involve the use of significant amounts of hazardous substances. Furthermore, none of the exceptions to the categorical exemptions stated in State CEQA Guidelines section 15300.2 apply. On this basis, the City Council relies on the previous CEQA review conducted in approving this agreement.
Recommendation:
Approve and authorize the City Manager to execute a Stormwater Management Facilities Operation and Maintenance Agreement for Robinson Oil Corporation Gas Station and Convenience Store Project at 1787 S Main St.
Attachment:
1. Stormwater Management Facilities Operation and Maintenance Agreement
2. Exhibit A
3. Exhibit B
162
Item # C6.
163
Item # C6.
164
Item # C6.
165
Item # C6.
166
Item # C6.
167
Item # C6.
168
Item # C6.
169
Item # C6.
170
Item # C6.
171
Item # C6.
172
Item # C6.
LEGAL DESCRIPTION
LANDS OF ROBINSON OIL CORPORATION
THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF MILPITAS, IN THE COUNTY OF SANTA CLARA, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS:
A PORTION OF THE LANDS OF ROBINSON OIL CORPORATION AS DESCRIBED IN THAT CERTAIN GRANT DEED RECORDED MARCH 24, 2014 AS DOCUMENT NO. 22550286, OFFICIAL RECORDS OF SANTA CLARA COUNTY, AND BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT THE POINT OF INTERSECTION OF THE CENTERLINE OF SOUTH MAIN STREET WITH THE
CENTERLINE OF MONTAGUE EXPRESSWAY AS CENTERLINES ARE SHOWN ON THAT CERTAIN PARCEL MAP FILES FOR RECORD ON OCTOBER 30, 1990 IN BOOK 620 OF MAPS, AT PAGE 46 AND 47; THENCE FROM SAID POINT OF COMMENCEMENT ALONG SAID CENTERLINE OF MONTAGUE EXPRESSWAY; THENCE NORTH 83°18’20” WEST, A DISTANCE OF 297.63 FEET; THENCE NORTH 19°34’15” EAST, A DISTANCE OF 81.12 TO THE TRUE POINT OF BEGINNING;
THENCE FROM SAID TRUE POINT OF BEGINNING; NORTH 19°34’15” EAST, A DISTANCE OF 169.15 FEET; THENCE SOUTH 89°44’20” EAST, A DISTANCE OF 151.00 FEET; THENCE SOUTH 00°15’40” WEST, A DISTANCE OF 104.63 FEET TO A POINT ON A 70.00 FOOT RADIUS TANGENT CURVE TO THE RIGHT, THROUGH AN INCLUDED ANGLE OF 96°26’00” AND ARC DISTANCE OF 117.82 FEET; THENCE SOUTH 83°18’20” EAST, A DISTANCE OF 129.91 FEET TO THE TRUE POINT OF BEGINNING.
CONTAINING 29,623 SQUARE FEET, MORE OR LESS.
APN: 086-21-073
173
Item # C6.
Stormwater Control Report
for
Rotten Robbie #66
1787 South Main Street, Milpitas, CA 95035
September 11, 2018
Owner:
Dave Mordick c/o Robinson Oil
955 Martin Avenue
Santa Clara, CA 95050
(408) 327-4300
Preparer’s Name:
Robert “JR” Beard, PE
LHB & Associates
867 Pacific Street, Suite 120
San Luis Obispo, CA 93401
(805) 540-5240
174
Item # C6.
Table of Contents
I. Project Data ........................................................... 1 II. Setting ..................................................................... 1 II.A. Project Location and Description ....................................................................................................... 1 II.B. Existing Site Features and Conditions ................................................................................................ 2 II.C. Opportunities and Constraints for Stormwater Control ................................................................... 3 III. Low Impact Development Design Strategies .... 3
III.A. Optimization of Site Layout ................................................................................................................ 3 III.A.1. Limitation of development envelope 3
III.A.2. Preservation of natural drainage features 3
III.A.3. Setbacks from creeks, wetlands, and riparian habitats 3 III.A.4. Minimization of imperviousness 3
III.A.5. Use of drainage as a design element 3
III.B. Use of Permeable Pavements............................................................................................................... 3 III.C. Dispersal of Runoff to Pervious Areas ................................................................................................ 3 III.D. Stormwater Control Measures ............................................................................................................ 4 IV. Documentation of Drainage Design .................. 4 IV.A. Descriptions of each Drainage Management Area ............................................................................. 4 IV.A.1. Table of Drainage Management Areas 4
IV.A.2. Drainage Management Area Descriptions 4
IV.B. Tabulation and Sizing Calculations .................................................................................................... 4 IV.B.1. Information Summary for LID Facility Design 4
IV.B.2. Areas Draining to Bioretention Facilities 4
V. Source Control Measures ..................................... 6 V.A. Site activities and potential sources of pollutants ............................................................................... 6 V.B. Source Control Table .......................................................................................................................... 6 V.C. Features, Materials, and Methods of Construction of Source Control BMPs .................................. 6 VI. Stormwater Facility Maintenance ....................... 6 VI.A. Ownership and Responsibility for Maintenance in Perpetuity .......................................................... 6 VI.B. Summary of Maintenance Requirements for Each Stormwater Facility ........................................... 6 VII. Construction Checklist ................................... 7 VIII. Certifications .................................................... 7
175
Item # C6.
Figures
Figure 1 Vicinity Map
Appendix
Appendix A - Stormwater Requirements C.3 Data Form
Appendix B - Infiltration/Harvesting Infeasibility Worksheet (NOT REQUIRED – OMITTED) Appendix C – Special Project Worksheet (NOT REQUIRED – OMITTED) Appendix D – Soil Properties
Appendix E – MRP Calculation Worksheet (NOT REQUIRED – OMITTED) Appendix F – BMP Sizing Calculations (NOT REQUIRED – OMITTED) Appendix G – Stormwater Control Plan
Appendix H – Stormwater Control Plan Details
Appendix I – Operation and Maintenance (O&M) Plan
176
Item # C6.
ROTTEN ROBBIE #66 PAGE 1 OF 7 SEPTEMBER 11, 2018
I. Project Data
Table 1. Project Data
Project Name/Number Rotten Robbie #66 - Milpitas
Application Submittal Date March 28, 2018
Project Location 1787 South Ma in Street, Milpitas, CA 95035 Project Phase No. NA
Project Type and Description The purpose of this project is to construct a gas station with convenience store, which entails construction of a 3,200 square feet commercial/retail building and 3,780
square feet fuel canopy with five (5) multi-product fuel dispensers. Additionally, the off-sale of alcohol is
proposed.
Total Project Site Area (acres) 0.74
Total New Impervious Surface Area 22,706
Total Replaced Impervious Surface Area 0
Total Pre-Project Impervious Surface Area 0
Total Post-Project Impervious Surface Area 22,706
Net Impervious Area NA
Project Zoning MP – Industrial Park
Project General Plan INP – Industrial Park
Assessor’s Parcel Number 086-21-069
II. Setting
II.A. Project Location and Description
The purpose of this stormwater report is to evaluate the existing and proposed stormwater management for the project.
It is proposed to construct a 3,200 square feet commercial retail building, 3,780 square fuel canopy, and install three (3) underground storage tanks containing fuel products with five (5) multi-product dispensers for use in private fueling.
Surrounding uses include commercial offices and church to the north, Shell Gas Station to the East, U-Haul rental truck to the south, and commercial offices to the west.
Design objective is to follow the development standards of the City of Milpitas Zoning Code, and adhere to Santa Clara Valley Urban Runoff Pollution Prevention Program standards. 177
Item # C6.
ROTTEN ROBBIE #66 PAGE 2 OF 7 SEPTEMBER 11, 2018
Refer to Figure 1 for project location.
Figure 1
II.B. Existing Site Features and Conditions
The existing site is formerly a 76 Gas Station that consisted of a service building, fuel pumps, and underground storage tanks. The site has been since completely demolished and is currently barren.
The site is relatively flat with a 2% slope. The existing stormwater currently infiltrates or surface flows to the street. There is a street frontage drain inlet located on South Main Street to collect stormwater surface flow.
There are no wetlands or watercourses nearby. The closest watercourse is Coyote Creek, which is located approximately 3,900 feet to the west.
Project site is surrounded by paved street frontage at the south and east, commercial at the north and west.
178
Item # C6.
ROTTEN ROBBIE #66 PAGE 3 OF 7 SEPTEMBER 11, 2018
II.C. Opportunities and Constraints for Stormwater Control The project site historically drains to South Main Street; the proposed design will maintain the same overland flow. As such, bio retention systems will be installed at the low points of the project site to receive the stormwater before releasing to existing storm drain system.
Landscape buffers are along the entire perimeter of the site which will allow for self-treating and infiltration.
Proposed use for this site is a gas station that will be 25% pervious and 75% impervious. Stormwater generated from pollutants from vehicular circulation will be captured in bio-retention areas to be treated prior to release into the storm drain system.
The soil conditions of the site are not ideal for infiltration. A soils report prepared by Korbmacher Engineering, dated February 15, 2018, indicated site soils as clay with a low infiltration rate. Available groundwater was encountered at approximately 20 feet below ground surface.
III. Low Impact Development Design Strategies
III.A. Optimization of Site Layout
III.A.1. Limitation of development envelope
Site limitations include proximity of building structure foundations, and underground storage tanks near bio-retention areas. Additionally, the proposed use of the project site is as a gas station. Fueling areas require that stormwater be diverted away via grade breaks, interception swale, or other means.
III.A.2. Preservation of natural drainage features
Drainage pattern shall maintain existing overflow route. Replacement of pervious surface with impervious will be addressed via bio-retention areas to be used for infiltration.
III.A.3. Setbacks from creeks, wetlands, and riparian habitats There are no creeks, wetlands, or riparian habitats near the project site.
III.A.4. Minimization of imperviousness
Parking areas have been minimized as much as feasible to minimize imperviousness.
III.A.5. Use of drainage as a design element
Landscape areas will assist in stormwater infiltration. Additionally, grading is proposed to be diverted from fueling area via grade breaks.
III.B. Use of Permeable Pavements
No permeable pavements are proposed.
III.C. Dispersal of Runoff to Pervious Areas
All stormwater runoff will be diverted to bio-retention areas. 179
Item # C6.
ROTTEN ROBBIE #66 PAGE 4 OF 7 SEPTEMBER 11, 2018
III.D. Stormwater Control Measures
Control measures include bio-retention areas that will infiltrate and have a bypass overflow system. The convenience store and fuel canopy will drain to the bio-retention areas via overland flow and bubble-up riser’s.
IV. Documentation of Drainage Design
IV.A. Descriptions of each Drainage Management Area
IV.A.1. Table of Drainage Management Areas
DMA Name
Surface Type
Area (square feet)
DMA 1 Roof, Pavement, Landscape 6,813
DMA 2 Pavement, Landscape 10,319
DMA 3 Roof, Pavement, Landscape 12,497
IV.A.2. Drainage Management Area Descriptions
DMA 1, totaling 6,813 square feet, drains a convenience store roof, and pavement. DMA 1 drains to TCM 1. Bio-retention area will collect stormwater, treat, and infiltrate as much as feasible, and overflow into existing storm drain system.
DMA 2, totaling 10,319 square feet, drains pavement. DMA 2 drains to TCM 2. Bio-retention area will collect stormwater, treat, and infiltrate as much as feasible, and overflow into existing storm drain system.
DMA 3, totaling 12,497 square feet, drains a canopy roof, and pavement. DMA 3 drains to TCM 3.
Bio-retention area will collect stormwater, treat, and infiltrate as much as feasible, and overflow into existing storm drain system.
IV.B. Tabulation and Sizing Calculations
IV.B.1. Information Summary for LID Facility Design
Total Project Area (Square Feet) 29,629
Applicable Requirements C.3, Santa Clara Valley Urban Runoff Pollution Prevention Program
IV.B.2. Areas Draining to Bioretention Facilities
180
Item # C6.
ROTTEN ROBBIE #66 PAGE 5 OF 7 SEPTEMBER 11, 2018
DMA
Name
DMA
Area
(square
feet)
Post-
project
surface
type
DMA
Runoff
factor
DMA
Area
runoff
factor
TCM Name
TCM 1
1 1,078 Concrete 1 1,078 TCM
Sizing
factor
Minimum
TCM
Size
Proposed
TCM
Size 1 3,081 Roof 1 3,081
Total 4,278 0.04 172 S.F. 359 S.F.
DMA
Name
DMA
Area
(square
feet)
Post-
project
surface
type
DMA
Runoff
factor
DMA
Area
runoff
factor
SCM Name
TCM 2
2 324 Roof 1 324
TCM
Sizing
factor
Minimum
TCM
Size
Proposed
TCM
Size
2 709 Concrete 1 709
2 8,160 Parking 1 8,160
Total 9,193 0.04 368 373
DMA
Name
DMA
Area
(square
feet)
Post-
project
surface
type
DMA
Runoff
factor
DMA
Area
runoff
factor
SCM Name
TCM 3
3 3,780 Roof 1 3,780 TCM
Sizing
factor
Minimum
TCM
Size
Proposed
TCM
Size 3 5,455 Parking 1 5,455
Total 9,235 0.04 370 712
181
Item # C6.
ROTTEN ROBBIE #66 PAGE 6 OF 7 SEPTEMBER 11, 2018
V. Source Control Measures
V.A. Site activities and potential sources of pollutants Refueling operations will occur onsite leading to possible pollutants such as hydrocarbons, oils, gasoline, and diesel fuel from vehicles.
V.B. Source Control Table
Refer to Attachments, Stormwater Requirements C.3 Data Form, Selection of Specific Stormwater Control Measures.
V.C. Features, Materials, and Methods of Construction of Source Control BMPs Source control BMPs entail use of bio-retention areas to treat runoff stormwater and infiltrate into underlying soils.
VI. Stormwater Facility Maintenance
VI.A. Ownership and Responsibility for Maintenance in Perpetuity Owner shall execute any necessary agreements, and accept responsibility for operation and maintenance of facilities until that responsibility is formally transferred.
VI.B. Summary of Maintenance Requirements for Each Stormwater Facility The following activities should be scheduled at least annually. The frequency should be adjusted in response to the needs of each particular facility.
Clean up. Remove any soil or debris blocking planter inlets or overflows. Remove trash that typically collects near inlets or gets caught in vegetation.
Prune or cut back plants for health and to ensure flow into inlets and across the surface of the facility. Remove and replant as necessary. When replanting, maintain the design surface elevation and minimize the introduction of soil.
Control weeds by manual methods and soil amendment. In response to problem areas or threatening invasions, corn gluten, white vinegar, vinegar-based products such as Burnout, or non-selective natural herbicides such as Safer’s Sharpshooter may be used.
Add mulch. Aged mulch, also called compost mulch, reduces the ability of weeds to establish, keeps soil moist, and replenishes soil nutrients. Mulch may be added from time to time to maintain a mulch layer thickness of 1" to 2", but only if the underlying soil surface beneath the mulch layer is a minimum 6" below the overflow elevation, consistently throughout the surface area of the facility.
Check signage. Remove graffiti and replace if necessary.
Check irrigation, if any, to confirm it is adequate but not excessive.
Landscape maintenance personnel should be aware of the following:
Do not add fertilizer to bioretention facilities. Compost tea, available from various nurseries and garden supply retailers, may be applied at a recommended rate of 5 gallons mixed with 15 gallons of water per acre, up to two weeks prior to planting and once per year between March and June. Do not apply when temperatures are below 50°F or above 90°F or when rain is forecast in the next 48 hours.
182
Item # C6.
ROTTEN ROBBIE #66 PAGE 7 OF 7 SEPTEMBER 11, 2018
Do not use synthetic pesticides on bioretention facilities. Beneficial nematodes and non-toxic controls may be used. Acceptable natural pesticides include Safer® products and Neem oil.
VII. Construction Checklist
Stormwater
Control
Plan
Page # BMP Description
See Plan Sheet
#s
EXHIBIT SCM 1, BIO-RETENTION C3.2
EXHIBIT SCM 2, BIO-RETENTION C3.2
EXHIBIT SCM 3, BIO-RETENTION C3.2
VIII. Certifications
The preliminary design of stormwater treatment fa cilities and other stormwater pollution control measures in this plan are in accordance with the current edition of the Santa Clara Valley Urban Runoff Pollution Prevention Program C.3 Stormwater Handbook.
183
Item # C6.
Appendix A
Stormwater Requirements C.3 Data Form
184
Item # C6.
City of Milpitas - SCVURPPP C.3. Data Form Page 1 of 4 12/2013
City of Milpitas – Stormwater Requirements C.3 Data Form
Santa Clara Valley Urban Run-Off Pollution Prevention Program
1. Project Information
Project Name: ____________________________________APN # _________________________ Project Address:
Cross Streets:
Applicant/Developer Name:
Project Phase(s): ______of______ Engineer:
Project Type (Check all that apply): /box2 New Development /box2 Redevelopment /box2 Residential /box2 Commercial /box2 Industrial /box2 Mixed Use /box2 Public /box2 Institutional /box2 Restaurant /box2 Uncovered Parking /box2 Retail Gas Outlet /box2 Auto Service (SIC code) _______ /box2 Other ________________________________________
Project Description: _______________________________________________________________
Project Watershed/Receiving Water (creek, river, or bay):_______________________________ Which Projects Must Comply with Stormwater Requirements? All projects that create and/or replace 10,000 sq. ft. or more of impervious surface on the project site must fill out this worksheet and submit it with the development project application.
All restaurants, auto service facilities, retail gasoline outlets, and uncovered parking lot projects (stand-alone or part of another development project, including the top uncovered portion of parking structures) that create and/or replace 5,000 sq. ft. or more of impervious surface on the project site must also fill out this worksheet.
Interior remodeling projects, routine maintenance or repair projects such as re-roofing and re-paving, and single family homes that are not part of a larger plan of development are NOT required to complete this worksheet.
What is an Impervious Surface?
An impervious surface is a surface covering or pavement that prevents the land’s natural ability to absorb and infiltrate rainfall/stormwater. Impervious surfaces include, but are not limited to rooftops, walkways, paved patios, driveways, parking lots, storage areas, impervious concrete and asphalt, and any other continuous watertight pavement or covering. Pervious pavement, underlain with pervious soil or pervious storage material (e.g., drain rock), that infiltrates rainfall at a rate equal to or greater than surrounding unpaved areas OR that stores and infiltrates the water quality design volume specified in Provision C.3.d of the Municipal Regional Stormwater Permit (MRP) is not considered an impervious surface.
For More Information
For more information regarding selection of Best Management Practices for stormwater pollution prevention or stormwater treatment in Santa Clara County : http://www.scvurppp -w2k.com/c3_han dbook_2012.shtml (5013-5014, 5541, 7532-7534, 7536-7539)
ROTTEN ROBBIE #66
086-21-069
1787 SOUTH MAIN STREET, MILPITAS, CA 95035
MAIN STREET AND MONTAGUE EXPRESSWAY
JOHN HICKS c/o HICKS PROJECT MANAGEMENT
1 1
ROBERT "JR" BEARD
✔
✔
✔
Proposed development includes construction of a 3,200 SF convenience store, (5) multi-product fueling dispensers, and a 3,780 SF canopy over the fuel dispensers.
Penitencia Creek
185
Item # C6.
City of Milpitas - SCVURPPP C.3. Data Form Page 2 of 4 12/2013
2. Project Size
a. Total Site Area:
____________________acre
b. Total Site Area Disturbed: __________________ ac re
(including clearing, grading, or excavating)
Existing Area (ft 2) Proposed Area (ft 2) Total Post-Project Area (ft 2) Replaced New
Impervious Area
Roof
Parking
Sidewalks and Streets
c. Total Impervious Area
d. Total new and replaced impervious area
Pervious Area
Landscaping
Pervious Paving
Other (e.g. Green Roof)
e. Total Pervious Area
f. Percent Replacement of Impervious Area in Redeve lopment Projects (Replaced Total Impervious Area ÷ Existing Total Impervious Area) x 100% = _ ______________________%
3. State Construction General Permit Applicability:
a. Is #2.b. equal to one acre or more?
/box2 Yes, applicant must obtain coverage under the Stat e Construction General Permit (i.e., file a Notice of Intent and prepare a Stormwater Po llution Prevention Plan) (see www.swrcb.ca.gov/water_issues/programs/stormwater/construction.shtml for details). /box2 No, applicant does not need coverage under the State Construction General Permit.
4. MRP Provision C.3 Applicability:
a. Is #2.d. equal to 10,000 sq. ft. or more, or 5,000 sq. ft. or more for restaurants, auto service facilities, retail gas outlets, and uncovered parking?
/box2 Yes, C.3. source control, site design, and treatment requirements apply. /box2 No, C.3. source control and site design requirements may apply – check with local agency b. Is #2.f. equal to 50% or more?
/box2 Yes, C.3. requirements (site design, source control, as appropriate, and stormwater treatment) apply to entire site.
/box2 No, C.3. requirements only apply to impervious area created and/or replaced.
5. Hydromodification Management (HM) Applicability:
a. Does project create and/or replace one acre or more of impervious surface AND is the total post-project impervious area greater than the pre-project (existing) impervious area? /box2 Yes (continue) /box2 No – exempt from HM, go to page 3 b. Is the project located in an area of HM applicability (green area) on the HM Applicability Map? ( www.scvurppp-w2k.com/hmp_maps.htm ) /box2 Yes, project must implement HM requirements
/box2 No, project is exempt from HM requirements
0.74 0.74
0 0
0 0
0 0
0 7304
13615
1787
22706
7304
13615
1787
22706
22706
29629
6923 0 6923
0 0
29629
0 0
6923
0 0
0 0
0 6923
(N/A)
✔
✔
✔
✔
186
Item # C6.
City of Milpitas - SCVURPPP C.3. Data Form Page 3 of 4 12/2013
6. Selection of Specific Stormwater Control Measure s:
Site Design Measures
/boxshadowdwn Minimize land disturbed
/boxshadowdwn Minimize impervious
surfaces
/boxshadowdwn Minimum-impact street
or parking lot design
/boxshadowdwn Cluster structures/
pavement
/boxshadowdwn Disconnected downspouts
/boxshadowdwn Pervious pavement
/boxshadowdwn Green roof
/boxshadowdwn Microdetention in
landscape
/boxshadowdwn Other self-treating area
/boxshadowdwn Self-retaining area
/boxshadowdwn Rainwater harvesting and
use
(e.g., rain barrel, cistern
connected to roof drains) 1
/boxshadowdwn Preserved open space:
_______ ac. or sq. ft
.(circle one)
/boxshadowdwn Protected riparian and
wetland areas/buffers
(Setback from top of bank:
_______ft.)
/boxshadowdwn Other _______________
Source Control Measures
/boxshadowdwn Alternative building
materials
/boxshadowdwn Wash area/racks, drain to
sanitary sewer
2 /boxshadowdwn Covered dumpster area,
drain to sanitary sewer
2 /boxshadowdwn Sanitary sewer
connection or accessible
cleanout for swimming
pool/spa/fountain
2 /boxshadowdwn Beneficial landscaping
(minimize irrigation, runoff,
pesticides and fertilizers;
promotes treatment)
/boxshadowdwn Outdoor material storage
protection
/boxshadowdwn Covers, drains for loading
docks, maintenance bays,
fueling areas
/boxshadowdwn Maintenance (pavement
sweeping, catch basin
cleaning, good housekeeping)
/boxshadowdwn Storm drain labeling
/boxshadowdwn Other _______________
Treatment Systems
/boxshadowdwn None ( all impervious surface
drains to self-retaining areas)
LID Treatment
/boxshadowdwn Rainwater harvest and
use
(e.g., cistern or rain barrel
sized for C.3.d treatment)
/boxshadowdwn Infiltration basin
/boxshadowdwn Infiltration trench
/boxshadowdwn Exfiltration trench
/boxshadowdwn Underground detention
and infiltration system
(e.g. pervious pavement drain
rock, large diameter conduit)
Biotreatment 3
/boxshadowdwn Bioretention area
/boxshadowdwn Flow-through planter
/boxshadowdwn Tree box with
bioretention soils
/boxshadowdwn Other _______________
Other Treatment Methods
/boxshadowdwn Proprietary tree box filter 4
/boxshadowdwn Media filter (sand, compost,
or proprietary media)4
/boxshadowdwn Vegetated filter strip 5
/boxshadowdwn Dry detention basin 5
/boxshadowdwn Other _______________
Flow Duration Controls for Hydromodification Management (HM)
/boxshadowdwn Detention basin /boxshadowdwn Underground tank or vault
/boxshadowdwn Bioretention with outlet
control
/boxshadowdwn Other
_______________
1 Optional site design measure; does not have to be sized to comply with Provision C.3.d treatment requi rements. 2 Subject to sanitary sewer authority requirements.
3 Biotreatment measures are allowed only with completed feasibility analysis showing that infiltration and rainwater harvest and use are infeasible.
4 These treatment measures are only allowed if the project qualifies as a “Special Project”. 5 These treatment measures are only allowed as part of a multi-step treatment process. ✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
187
Item # C6.
City of Milpitas - SCVURPPP C.3. Data Form Page 4 of 4 12/2013
7. Treatment System Sizing for Projects with Treatment Requirements
Indicate the hydraulic sizing criteria used and provide the calculated design flow or volume:
Treatment System Component Hydraulic Sizing
Criteria Used 3
Design Flow or
Volume
(cfs or cu.ft.)
3Key: 1a: Volume – WEF Method
1b: Volume – CASQA BMP Handbook Method
2a: Flow – Factored Flood Flow Method
2b: Flow – CASQA BMP Handbook Method
2c: Flow – Uniform Intensity Method
3: Combination Flow and Volume Design Basis
8. Alternative Certification: Was the treatment system sizing and design reviewed by a qualified third- party professional that is not a member of the project team or agency staff?
/box2 Yes /box2 No Name of Reviewer: _____________________________ ______________
9. Operation & Maintenance Information
A. Property Owner’s Name: ____________________________ _____________ B. Responsible Party for Stormwater Treatment/Hydromodification Control O&M:
a. Name: _________________________________________
b. Address: _________________________________________ c. Phone/E-mail: ____________________________________ _____
This section to be completed by City of Milpitas staff.
O&M Responsibility Mechanism
Indicate how responsibility for O&M is assured. Check all that apply:
/box2 O&M Agreement
/box2 Other mechanism that assigns responsibility (describe below):
___________________________________________________ _____________________________________ ___________________________________________________ _____________________________________
Reviewed:
Planning Department Public Works Department
Planning Division: ________ Land Development: ___ _____ Other (Specify): ________ Other (Specify): ________
BIO-RETENTION (4% IMPERVIOUS SURFACE AREA)
2C
0.07 CFS
✔
DAVE MORDICK c/o ROBINSON OIL
DAVE MORDICK
955 MARTIN AVENUE, SANTA CLARA, CA 95050
(408) 327-4300 / [email protected]
188
Item # C6.
Appendix D
Soil Properties
189
Item # C6.
190
Item # C6.
BORING LOCATION MAP
Not to scale
FIGURE NO.
KorbmacherE n gi ne e r i n g In c .
4 DATE
B-1
B-3
B-2
1/18
Files\Reports 2017\17169\Figure4
PROJECT NO. 17169
Rotten Robbie #66
1787 South Main Street
Milpitas, California
191
Item # C6.
UNIFIED SOIL CLASSIFICATION SYSTEM
MAJOR
DIVISIONS
WELL-GRADED GRAVELS OR
GRAVEL SAND MIXTURES.
LITTLE OR NO FINES
POORLY-GRADED GRAVELS
OR GRAVEL SAND MIXTURE,
LITTLE OR NO FINES
SILTY GRAVELS,
GRAVEL-SAND-SILT
MIXTURES
CLAYEY GRAVELS,
GRAVEL-SAND-CLAY
MIXTURES
WELL-GRADED SANDS OR
GRAVELLY SANDS, LITTLE
OR NO FINES
INORGANIC SILTS, MICACEOUS
OR DIATOMACEOUS FINE,
SANDY OR SILTY SOILS,
ELASTIC SILTS
INORGANIC SILTS AND VERY
FINE SANDS, ROCK FLOUR,
SILTY OR CLAYEY FINE
SANDS OR CLAYEY SILTS
WITH SLIGHT PLASTICITY
INORGANIC CLAYS OF LOW
TO MEDIUM PLASTICITY,
GRAVELLY CLAYS, SANDY
CLAYS, SILTY CLAYS,
LEAN CLAYS
ORGANIC SILTS AND
ORGANIC SILT-CLAYS OF
LOW PLASTICITY
INORGANIC CLAYS OF
MEDIUM TO HIGH
PLASTICITY, FAT CLAYS
ORGANIC CLAYS OF MEDIUM
TO HIGH PLASTICITY,
ORGANIC SILTS
PEAT AND OTHER HIGHLY
ORGANIC SOILS
POORLY-GRADED SANDS, OR
GRAVELLY SANDS, LITTLE
OR NO FINES
SILTY SANDS, SAND-SILT
MIXTURES
CLAYEY SANDS, SAND-CLAY
MIXTURES
THE LINES SEPARATING STRATA ON THE LOGS
REPRESENT APPROXIMATE BOUNDARIES ONLY.
THE ACTUAL TRANSITION MAY BE GRADUAL. NO
WARRANTY IS PROVIDED AS TO THE CONTINUITY
OF SOIL STRATA BETWEEN BORINGS. LOGS
REPRESENT THE SOIL SECTION OBSERVED AT
THE BORING LOCATION ON THE DATE OF
DRILLING ONLY.
LTR
GW
ML
GP
GM
GC
SW
SP
SM
SC Pt
HIGHLY
ORGANIC
SOILS
OH
CH
MH
CL
OL
DESCRIPTION
COARSE-GRAINED SOILS
GRAVEL AND GRAVELLY SOILSSAND AND SANDY SOILS
NOTES KEY TO SYMBOLS
MAJOR
DIVISIONS LTR DESCRIPTION
FINE-GRAINED SOILS
SILTS AND CLAYS
LL < 50
SILTS AND CLAYS
LL > 50
MODIFIED CALIFORNIA SAMPLER, 2.0-ID
MODIFIED CALIFORNIA SAMPLER, 2.5-ID
STANDARD PENETRATION
SPLIT-SPOON SAMPLE
WATER LEVEL OBSERVED IN BORING
NO RECOVERY
NO FREE WATER ENCOUNTEREDNFWE
SP
SHELBY TUBE SAMPLE
BORING LOG LEGEND FIGURE NO.
KorbmacherEn gi ne e r i n g In c .
5 DATE
Files\Reports 2017\17169\Figure5
1/18PROJECT NO. 17169
Rotten Robbie #66
1787 South Main Street
Milpitas, California
192
Item # C6.