www.hydroscience.com
Once the RDI/I and total volume of rainfall are calculated, the R-factor is a simple calculation of RDI/I volume divided by rainfall volume, resulting in the estimated portion of rainfall that enters the wastewater collection system. These values were also iteratively adjusted during the model calibration process.

7.4.4 Wet Weather Calibration
To initiate the wet weather calibration process, the observed rainfall collected at both rain gauges for Storm event 1 was added to the model (see Figure 7-12). During the calibration process, it was noted that the peak flows for all valley floor sub-basin meters occurred approximately three hours prior to the peak rainfall, which was clearly elevated related to rainfall as compared to dry weather flow. It appears that there may have been an error in the timestamps of RG01, so the rainfall was shifted three hours earlier.

Wet Weather GWI
GWI fluctuates over the course of the year, increasing during the wet season as the water table rises. The extent that the water table rises and falls is site specific and can be affected by geology, surface water features, and tides. By extension, wet weather GWI changes are also site specific and can also depend on the condition of the pipelines. In the wet weather calibration scenarios of the model, GWI values established during the dry weather calibration process were iteratively increased to reflect the elevated water table more accurately during the wet season as displayed by an increase in the minimum flows.

RDI/I R-Factor
The RDI/I is estimated using the R-factor, or the percentage of rainfall that enters a sewer system as described in Section 7.4.1, and the Tri-Triangular Method. The Tri-Triangular Method, which is the industry standard for representing wet weather flows, involves summing three separate hydrographs to derive a single unit hydrograph. The total R-factor is divided into three separate values, represented as triangles (see Figure 7-13), based on the speed at which rainfall enters the sewer system, as described below:
 Rapid (R1) – Stormwater inflow that enters the sewer system most rapidly, typically through entry points such as holes in manhole covers. The peak of this triangle occurs one to three hours after the start of the rainfall.
 Intermediate (R2) – A combination of rapid stormwater inflow and slow rainfall-dependent infiltration.
 Slow (R3) – Long term delayed rainfall-dependent infiltration. The peak of this triangle occurs the longest time after the start of the rainfall, and the effects of this infiltration can continue long after the end of the rainfall.
859
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 7 ends

www.hydroscience.com
Figure 7-13: Tri-Triangular R-Factor Method
The initial estimated R-factors (R1, R2, and R3) for each sub-basin were input into the model, which generated the total R-factors. Total R-factors are simply the sum of the individual R-factors (R1 + R2 + R3). The entered R-factors were iteratively adjusted for each sub-basin by comparing modeled flows to observed flows at each flow meter during the day of, and the two days following, the storm. During this part of the calibration process, it is critical to capture the peak flows as accurately as possible to avoid underestimating capacity deficiencies.

The final calibrated R-factors for each sub-basin are presented in Table 7-8.

For wet weather calibration of the system, average modeled flows representing Storm event 1 and one day following the storm are 3.3% higher than measured flows. Modeled peak WWF for Storm event 1 are 2.3% higher than measured peak flows. A calibration within 5% is considered a good representation of actual conditions and having modeled flows higher than measured flows assures that the model is conservative in its representation of the collection system.

A sample wet weather calibration chart is displayed in Figure 7-14. Wet weather calibration charts for all flow meters are attached as Appendix E.

Total R-Factor
R1
R2
R3 Flow
Time
860
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 7 ends

www.hydroscience.com
Table 7-8: Final Calibrated R-Factors
Sub-Basin Acreage R1 R2 R3 Total R-Factor
A 138 0.40% 0.85% 0.23% 1.48%
B 433 0.80% 0.66% 0.13% 1.59%
C 192 0.27% 0.00% 0.02% 0.30%
D 208 0.26% 1.64% 0.00% 1.90%
E 455 0.53% 0.00% 0.07% 0.60%
F 414 0.67% 0.00% 0.19% 0.86%
G 78 1.27% 2.14% 0.00% 3.40%
H 110 0.24% 0.00% 0.00% 0.24%
I 81 0.08% 0.35% 0.00% 0.42%
J 79 0.00% 0.67% 1.50% 2.17%
K 187 0.10% 0.56% 0.15% 0.81%
L1 266 0.09% 0.17% 0.14% 0.40%
L2 607 0.09% 0.17% 0.05% 0.31%
M 57 1.07% 0.26% 0.07% 1.39%
N 55 0.55% 1.17% 0.34% 2.06%
O1 207 0.70% 0.40% 0.40% 1.50%
P 537 0.59% 0.30% 0.37% 1.26%
Q 151 0.45% 0.00% 0.15% 0.60%
R 34 1.30% 2.41% 0.00% 3.71%
S 393 0.00% 1.30% 0.34% 1.64%
T 207 0.25% 0.12% 0.26% 0.64%
Average2 4,889 0.40% 0.45% 0.19% 1.04%
Notes:

1. There is no flow meter at the outfall for sub-basin O. Values were estimated based on surrounding sub-basins.

2. The average represents the weighted average by sub-basin area.

In summary, total R-factors for each subbasin ranges from 0.24% up to 3.71%, which represents the percentage of rainfall entering the collection system. A low R-factor would be less than 3% and 10% is considered high. The weighted average for the entire system is 1.04%; this is considered a relatively watertight system with limited rainfall entering the collection system. 861
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 7 ends

www.hydroscience.com
Figure 7-14: Example of Wet Weather Model Calibration Charts 862
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 7 ends

www.hydroscience.com

THIS PAGE INTENTIONALLY LEFT BLANK
863
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 8 ends

www.hydroscience.com
SECTION 8 – CAPACITY ANALYSIS
The hydraulic analysis for the collection system was evaluated under design storm for existing and future land use conditions. This section describes the analysis and the resulting deficiencies.

8.1 Design Storm
To estimate WWF, a design storm is applied to the model and wet weather flows are represented based on the calibrated R-factors for each sub-basin. A range of storms was considered for the design condition of this study. Both the 2002 and 2009 Master Plans used a 10-year, 4-hour constant distribution storm. Often, a 10-year 24-hour storm is used with a peak hour coinciding with the peak of the typical diurnal curve. A 5-year 24-hour storm was also available in the event that a 10-year 24-hour storm caused exceedingly large flows due to high rates of RDI/I.

For this study, the typical 10-year 24-hour storm with a peak hour coinciding with the peak of the typical diurnal curve was deemed appropriate.

Figure 8-1: 10-Year 24-Hour Design Storm
Source: NOAA Atlas 14 Volume 6 Version 2 precipitation frequency estimates in inches for Milpitas, California (https://hdsc.nws.noaa.gov/hdsc/pfds).

0.00 0.10

0.20 0.30

0.40 0.50

0.60 0.70 in/hr
864
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 8 ends

www.hydroscience.com

8.2 Deficiency Criteria
The initial deficiency criteria used to evaluate the capacity of the modeled pipes under design flow conditions was the ratio of wastewater flow depth (d) to pipe diameter (D), or d/D. In InfoWorks, if d/D is greater than one, this means the pipe is flowing full under pressure and the hydraulic grade line (HGL) is higher than the crown of the pipe. InfoWorks also reports a “surcharge state” for each pipe, and Table 8-1 summarizes the definition of each surcharge state.

In the hydraulic model, the HGL reaching the ground surface indicates a potential SSO. Even for a pipe flowing under capacity or surcharged, if the freeboard – the distance between the ground surface and the HGL – is five feet or greater, the risk of SSO is minimal. Where pipes were shown as surcharged due to inadequate hydraulic capacity (surcharge state of “2”), a pipe was identified as deficient if the freeboard in these locations is also less than five feet.

Table 8-1: InfoWorks Surcharge States
Surcharge
State Definition Deficiency if:
< 1 1 When depth of flow is less than the diameter of the pipe Not considered hydraulically deficient
= 1 Pipe is surcharged due to backwater from a downstream deficiency. Not considered hydraulically deficient
= 2 Pipe is hydraulically under capacity and needs to be upsized. Freeboard < 5 feet Notes:

1. Surcharge State = d/D

8.3 Assumed Condition
As detailed in Section 7.3.4, there were three critical flow splits identified in the system as having major flow obstructions that drastically changed the flow path of wastewater – likely from grease buildup at MH 539, MH 543, and MH 2488. During the dry weather calibration process, these flow splits were modified in the model to match the wastewater flows observed in the system. For the hydraulic analysis, system performance was evaluated based on the assumption that these obstructions have been cleared and the system is operating as intended.

8.4 Future Condition
Section 5.2 presents the process used to update the land use for potential future redevelopment areas in the City to estimate future wastewater flows. For the hydraulic analysis of the system under future conditions, calibrated GWI, UF factors, and R-factors developed above were applied to the updated land uses for projected future buildout conditions. The same design storm was used for both existing and future conditions.

8.4.1 Large Dischargers
If parcels were identified as large dischargers under existing conditions and located within “Opportunity Areas” (see Figure 2-2 and Figure 5-2), the existing land use was compared to the future land use; where the land uses differed, the future land use UF factor was applied. If there 865
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 8 ends

www.hydroscience.com
was no change to the land use, then the large discharger wastewater flow (see Table 7-5) under existing conditions was maintained for the future scenario.

Table 8-2 lists the large dischargers that were removed from the future condition and replaced with the future land use UF factors.

Table 8-2: Summary of Large Discharger Sites Planned for Redevelopment Rank Location1 Existing
Land Use
Future
Land Use
13 Main St COM MFH
15 McCarthy Blvd INP PAO
16 Landess Ave COM HDMU
20 McCarthy Blvd INP PAO
23 McCarthy Blvd INP PAO
26 Calaveras Blvd COM HDMU
36 Park Victoria Dr COM HDMU
Notes:

1. Source: January-March 2019 water meter customer billing data provided by the City multiplied by 85% - assumed portion of water use that contributes to wastewater flows.

Los Esteros Ranch, which is located at the intersection of McCarthy Blvd and Dixon Landing Road, is connected to the City collection system. This land use was added to the modeled system in accordance with the City’s agreement with Los Esteros Ranch. The agreement between the City and Los Esteros Ranch, attached as Appendix F, states that they have a maximum allowable water usage of 50,000 gpd among the three parcels included in the agreement. Applying the same method identified for other large dischargers (see Section 7.3.2), it was assumed that wastewater flows constitute approximately 85% of water usage. Los Esteros Ranch was assigned a wastewater flow of 42,500 gpd and was added as a large discharger for the future condition.

The area of the three contributing parcels was measured using the Measure tool in Bluebeam Revu 2016 and calibrated using the scale bar displayed on Exhibit “A” of the Los Esteros Ranch Agreement.

8.5 Hydraulic Capacity Deficiencies
Under dry weather conditions, Table 8-3 shows a 6% increase to 7.9 MGD in average flow for future conditions at the outfall.

Table 8-3: Model Flow Summary
Scenario Average DWF (MGD) Peak DWF (MGD) Peak WWF (MGD) Existing 7.5 10.4 14.9
Future 7.9 11.0 18.5

866
Item # 16.
"
"
3 1
2 4
§¨¦680
§¨¦880
UV237
N
_
FIGURE 8-2

CITY OF MILPITAS

SEWER MASTER PLAN

SURCHARGED PIPELINE SEGMENTS
LEGEND
" LIFT STATION

SURCHARGED

MODEL SEWER MAIN
867
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 8 ends

www.hydroscience.com
Under all scenarios, there were no additional surcharged segments identified under future conditions that were not seen under existing conditions. It is expected that this is because the City is largely built out and system improvements implemented with development have addressed potential deficiencies.

There were six pipe segments with a recorded surcharge state of “2” (see Section 8.2) under both existing and future conditions indicating that they are under capacity. These segments are displayed on Figure 8-2. Provided below is a description of each of these pipelines:
 Surcharged Location 1: This pipe segment drops below the minimum freeboard deficiency criteria (see Table 8-1) with a freeboard of 4.7 ft, shown in Figure 8-3. For a single pipe reach, replacement is not recommended without further cause. It is recommended that the City monitor this location for surcharging. This location (MH GID 1392) is a good candidate for installing a SmartCover to monitor the wastewater level and prevent SSOs.  Surcharged Location 2: These two surcharged segments are 6-inch mains. Freeboard at these locations is greater than five feet, so they do not exceed the criteria for a capacity deficiency and therefore are not considered deficient. In general, it is recommended that all future sewer mains in the collection system are constructed with minimum diameters of 8- inches.

Figure 8-3: Surcharged Location 1 with 4.7 feet of Freeboard 868
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 8 ends

www.hydroscience.com
 Surcharged Location 3: These two surcharged segments are 10-inch pipes. Freeboard at these locations is greater than five feet, so they do not exceed the criteria for a capacity deficiency and therefore are not considered deficient.
 Surcharged Location 4: This pipe, identified as under capacity (GID 17506), is located to the west of the intersection between N. Milpitas Blvd. and Washington Dr. In GIS, this segment was identified as an 8-inch pipe; however, both upstream and downstream pipes were identified as 12-inch pipes. During the review of record drawings, it was unclear if this pipe has been upsized to match the neighboring pipes. In the model, this segment experiences surcharging during wet weather as an 8-inch pipe, however, when this segment is upsized to 12-inches to match the neighboring pipe diameters, there is no longer surcharging. An improvement project is not recommended at this location as the freeboard is over ten feet and does not meet the threshold for deficiency identified in Table 8-1. 869
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 9 ends

www.hydroscience.com
SECTION 9 – PROJECT DEVELOPMENT
Based on the condition assessment described in SECTION 4, projects were recommended to address prioritized defects identified in the collection system. This section describes the prioritization process and a summary of the project cost development. Results of this project development and selection translate into a prioritized CIP for the wastewater collection system.

9.1 Rehabilitation Selection Methodology
The PACP peak scores from the CCTV inspection and the risk scores calculated from the LoF/CoF desktop condition assessment drive the pipeline rehabilitation selection process. Below is a summary of the methodology implemented for both inspected and non-inspected pipe.

9.1.1 CCTV Inspected Segments
For segments with CCTV inspection data, a two-step process was used to determine the final rehabilitation recommendation. Using the defect coding assigned by NPS and the IAP software, the pipe segments with defects were assigned one of the following defect-level rehabilitation methods:
 Replace;
 Cured-in-place pipeline (CIPP);
 Point repair by excavation; or
 Sectional liner.

When the user assigns a rehabilitation method for each defect code, IAP assigns the respective rehabilitation method to each segment based on the associated defect coding.

Table 9-1 presents a sample of the assigned rehabilitation methods for all structural defects with a score of 5. A full list of all defect codes and associated rehabilitation methods can be found in Appendix A (R&R Study App. H).

With the rehabilitation method established for each defect code, a decision tree was established to determine the final overall rehabilitation method for the pipeline. This decision tree was prepared based on the following factors:
 CCTV structural peak score and overall peak score;
 Number of point repairs and lining recommendations by the defect-level rehabilitation methods module;
 Number of defects;
 Length of major (score of 4 or 5) and/or minor (score of 3) defects; and  Presence of specific defects such as infiltration drippers (ID) or Reinforcement Corroded Chemical (SRCC).
870
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 9 ends

www.hydroscience.com
Figure 9-1 presents a schematic of the established decision tree. Pipeline segments with CCTV inspection data are filtered by their PACP peak scores. Then, they are analyzed based on the number of point repairs and lining recommendations established by the defect-level rehabilitation methods module as well as the number of defects, length of defects, and presence of specified minor, but not negligible, defects. When multiple rehabilitation options were recommended, a cost analysis was performed to determine the best action. For example, if a segment was recommended to receive ten sectional liners, a full liner would be more cost-effective.

Table 9-1: Sample of Defect Codes with Associated Rehabilitation Methods Defect Code Score Defect Type Description Rehabilitation Method BSV 5 Structural Broken Soil Visible Point repair
BVV 5 Structural Broken Void Visible Point repair
DI 5 Structural Dropped Invert Point repair
DV 5 Structural Deformed Vertical Brick Point repair
HSV 5 Structural Hole Soil Visible Point repair
HVV 5 Structural Hole Void Visible Point repair
SMW 5 Structural Missing Wall Point repair
SMWC 5 Structural Missing Wall Chemical Point repair
SMWM 5 Structural Missing Wall Chemical Point repair
SMWZ 5 Structural Missing Wall Unknown Point repair
SRC 5 Structural Reinforcement Corroded Point repair
SRCC 5 Structural Reinforcement Corroded Chemical Point repair SRCM 5 Structural Reinforcement Corroded Mechanical Point repair SRCZ 5 Structural Reinforcement Corroded Unknown Point repair SRP 5 Structural Reinforcement Projecting Lining
SRVM 5 Structural Reinforcement Visible Mechanical Lining SRVZ 5 Structural Reinforcement Visible Unknown Lining
XB 5 Structural Collapse Brick Sewer Point repair
XP 5 Structural Collapse Pipe Sewer Point repair
Figure 9-2 displays the final rehabilitation methods recommended for each segment based on the decision tree. For a table of the recommended rehabilitation method for each segment, see Appendix A (R&R Study App. A).

9.1.2 Segments without CCTV Inspection
For segments without CCTV inspection data, risk scores and diameter were used to develop a prioritized set of segments that are recommended for CCTV inspection and further analysis.

Pipeline segments with a risk score of medium or higher (greater than or equal to three) – see Section 4.2.3 – were included as part of this CCTV recommendation. Additionally, all pipelines with a diameter of 24-inches or greater are recommended for prioritized CCTV regardless of the associated risk rating. Figure 9-3 presents the segments recommended to prioritize for CCTV. 871
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 9 ends

www.hydroscience.com
Figure 9-1: Rehabilitation Decision Tree
872
Item # 16.
"
"
§¨¦680
§¨¦880
UV237
N
_
FIGURE 9-2

CITY OF MILPITAS

SEWER MASTER PLAN

RECOMMENDED REHABILITATION METHOD
LEGEND
" LIFT STATION

REPLACE

FULL CIPP

POINT REPAIR(S) BY

EXCAVATION
FULL CIPP + POINT REPAIR(S)

BY EXCAVATION

SECTIONAL LINER(S)
SECTIONAL LINER(S) + POINT

REPAIR(S) BY EXCAVATION

NO ACTION
873
Item # 16.
"
"
§¨¦680
§¨¦880
UV237
N
_
FIGURE 9-3

CITY OF MILPITAS

SEWER MASTER PLAN

RECOMMENDED CCTV PRIORITY
LEGEND
" LIFT STATION

GRAVITY MAIN

MEDIUM TO EXTREME RISK

LARGE DIAMETER
874
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 9 ends

www.hydroscience.com

9.2 Basis of Cost Assumptions
A cost estimate was developed for each type of rehabilitation method. Provided is a description of the basis for unit cost development and associated project-specific costs for pipelines, resurfacing, manholes, pumping systems, structural rehabilitation, protective coatings, bypass and redundancy, and electrical equipment. The purpose of approximating construction costs is to appropriate a conservative level of funding for each identified rehabilitation project included within the proposed scope of the City’s upcoming CIP. Appendix A (R&R Study App. J) contains details of the preliminary cost estimates for all projects analyzed as part of this SMP.

9.2.1 CCTV Costs
CCTV costs were estimated based on diameter and length. Unit costs are conservative to account for the added cost for specialized techniques, such as laser profiling for large diameter pipe, and general quality control review. Unit costs are provided in Table 9-2.

Table 9-2: CCTV Unit Costs
Pipe Diameter (in) Unit Cost ($/ft)
Up to 18 $4
19 to 24 $5
25 to 36 $6
37 to 66 $8

9.2.2 Pipeline Costs
Pipeline construction costs were developed in coordination with the City according to the City’s cost criteria.

9.2.3 Soft Costs
Soft costs are additional project costs that are not considered to be contractor construction costs.

These costs include engineering design, permitting, construction administration, and construction management. Typical soft costs include the following:
 Engineering design and consulting is expected to also address California Environmental Quality Act (CEQA) requirements to identify significant environmental impacts, if any.  Permitting, land acquisition and obtaining right-of-way (ROW) are dependent on the project.

For existing City facilities, the cost is expected to be less than if an easement is needed to be obtained through a property. The cost is also expected to be a function of the total cost. A range of percentages were applied to each project.
 Engineering services during construction (ESDC) and construction management costs are those costs associated with the administration of the contract and management of the project, ensuring the project is constructed as designed.
 The annual inflation of cost that would occur over time for a future project. 875
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 9 ends

www.hydroscience.com
Table 9-3 provides a summary of the parameters used for estimating the soft costs. Soft costs were applied to all projects.

Table 9-3: Soft Cost Estimating Parameters
Cost Parameter Cost Applied to:

Engineering Design and Consulting Services 15% Construction Subtotal Permitting, land acquisition, and obtaining ROW 7% Construction Subtotal ESDC, Construction Management, & Inspection Services 12% Construction Subtotal Annual Inflation 3% Project Total
876
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 9 ends

www.hydroscience.com

THIS PAGE INTENTIONALLY LEFT BLANK
877
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 10 ends

www.hydroscience.com
SECTION 10 – CAPITAL IMPROVEMENT PLAN
This section presents a summary of the prioritized set of CIP projects developed as a culmination of the condition assessment (CCTV inspection, desktop inspection, and lift station inspection) presented in SECTION 4 and the project development summarized in SECTION 9.

Recommendations include budget estimates and targeted timelines for project implementation based on the prioritization laid out in SECTION 9.

10.1 Existing CIP Projects
Every year, the City prepares a five-year CIP that provides the City Council, staff, and public with a comprehensive planning tool for budgeting and carrying out a range of capital projects. To ensure that the recommendations provided as part of this Master Plan Study align with recent, ongoing, and planned projects, a review of the City’s 2020-2025 CIP was conducted. Table 10-1 presents recent and ongoing wastewater collection system and lift station improvement projects per the 2020-2025 CIP.

Table 10-1: Recent Sewer Improvement Projects
Project ID Project Description Status
6119
Sanitary Sewer
Condition
Assessment
Program
Citywide sanitary sewer condition assessment
program to determine the condition of the City's
sanitary sewer system.

This phase to be completed
during FY 2020/21.
6124
Pump Station
Rehabilitation
Program
Rehabilitation or replacement of wastewater
pumps at Main LS and Venus LS to safely
discharge sewage.

Replacement of pump no. 3
and purchase of portable
backup generator at the
Main LS planned for FY
2020-21.
6126 Minor Sewer
Projects
Ongoing analysis, engineering, and
implementation of various minor modifications
and improvements to existing sewer systems.

Transfer switch at Venus
and pavement restoration at
the Main LS are planned for
FY 2020-21.
6130
Main LS Odor
Emissions
Control
Installation of odor emission controls at the Main
LS to address concerns regarding elevated
levels of hydrogen sulfide and other odorous
compounds at the facility.

Design started in FY2018-
19 and construction started
during spring 2020.
6131
Sanitary Sewer
Cathodic
Protection
Improvements
Assessment, design, and installation of cathodic
protection system along City's steel sewer force
main from the Main LS to the RWF. Includes
replacement of two existing magnetic flow
meters at the Main LS with proper isolation to
prevent reading interference.

Assessment and design
started in FY 2019-20.
6134
On-Call Sewer
Maintenance &
Repair Services
On-call repair and maintenance services at all
City sewer infrastructure, assets, and
appurtenances.

Ongoing
Plan
Sewer Line
Replacement at
E. Curtis
Design and construction of sanitary sewer main
replacement/upgrade on E. Curtis Avenue from
S. Main Street to the E. Curtis cul-de-sac. This
project will be financed through TASP Impact
Fees.
2023-2024
878
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 10 ends

www.hydroscience.com
Table 10-2 provides a summary of the 2020-2025 allocation for each of the projects and the sources of funding for each per the City’s Capital Improvement Program 2020-2025 Final Report.

Table 10-2: Existing CIP Financing for 2020-2025
Projects
Sewer
Infrastructure
Fund
Sewer Fund
Sewer
Treatment
Fund
Total
6119 Sanitary Sewer Condition Assessment Prgm1 ($50,000) ($74,000) $0 $ 0 6124 Pump Station Rehabilitation Program2 $52,000 $0 $0 $52,000 6126 Minor Sewer Projects3 $163,000 $0 $0 $163,000
6130 Main Lift Station Odor Emissions Control $0 $0 $200,000 $200,000 6131 Sanitary Sewer Cathodic Protection
Improvements $500,000 $0 $0 $500,000
6134 On-Call Sewer Maintenance & Repair
Services $24,000 $74,000 $0 $98,000
Total Existing Projects $689,000 $0 $200,000 $889,000
Notes:

1. The total $124,000 in prior year funding from Sewer Fund and Sewer Infrastructure Fund to be allocated for other projects in FY2020-21. There is no further allocation for this program according to the Capital Improvement Program 2020-2025 Final Report

2. This is the net allocation. Original allocation is $200,000 with $148,000 in prior year funding from Sewer Infrastructure Fund to be allocated for other projects in FY2020-21.

3. This is the net allocation. Original allocation is $200,000 with $37,000 in prior year funding from Sewer Infrastructure Fund to be allocated for other projects in FY2020-21.

Sewer CIP are largely funded by the Sewer Infrastructure Fund. Other funding sources include the Sewer Fund (user rate structure) and the Sewer Treatment Fund (sewer connection fees).

The funds are described in the CIP 2020-2025 Final Report as follows:
 Sewer Infrastructure Fund: Monies set aside to replace aging infrastructure for sewer related projects.
 Sewer Fund: Enterprise fund which receives revenue from sewer rates for sewer related improvements.
 Sewer Treatment Fund: Funded from fees collected from developers connecting to the Sewer System. Funds restricted for sewer related projects.

10.2 Proposed CIP Projects
Three alternatives to project phasing were evaluated in developing the proposed CIP phases.

The first alternative addresses CIP projects based on BRE grades without consideration of project location, prioritizing the highest risk projects. The second alternative approach groups projects geographically within the sewer basin. The third alternative, which was selected for implementation, was a hybrid approach where pipelines with significant defects were prioritized in the first year and each subsequent year considered risk, type of rehabilitation, and geographic location. The general strategy is to address the highest risk/highest priority projects in the nearterm (Years 1-5) with lower risk projects deferred to the medium- (Years 6-10) and long-term (Years 11-20). The objective was to budget for approximately $1.5M-$2M annually. Depending on funding availability, projects can slide up or down CIP phases while maintaining project priority. 879
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 10 ends

www.hydroscience.com
The detailed risk assessment, basis for selecting rehabilitation methods, prioritization of improvements, and the related construction costs (construction and contingency) are provided in Appendix A (R&R Study).

Soft costs, as described in Section 9.2.3, consisting of engineering design and consulting; permitting and ROW; and ESDC, construction management and inspection services are included in the capital project costs provided. The following sections present the recommended projects for implementation and the proposed timeframe.

10.2.1 CCTV Inspection
Approximately 105,000 ft (449 segments) of sewer main was inspected as part of the condition assessment. The remaining 685,000 ft was analyzed using the desktop assessment. Mediumto extreme-risk pipes and large diameter pipes are recommended for CCTV inspection. Large diameter pipe is defined as 24-inch diameter or greater. Figure 9-3 presents the recommended CCTV inspection map of these highest priority areas. These inspections total 55,000 ft, with an estimated cost totaling approximately $400,000 based on the unit costs provided in Section 9.2.1.

It is noted that the CCTV inspection work may generate additional improvement projects that may augment the proposed CIP. There is an existing CIP project (6126) that is intended to address minor sewer projects that currently allocates $50,000 annually. It is recommended that the City increase the annual allowance to $250,000 ($1.25M every five years) to budget for improvements needed to address defects as they are discovered during new CCTV inspections.

10.2.2 Pipeline Improvements
Of the approximately 105,000 ft (449 segments) of sewer pipeline inspected, approximately 50,000 ft (178 segments, see Figure 9-2) requires improvement. Recommended improvements include:
 Pipe Replacement
 Full Cured-In-Place Pipe (CIPP)
 Point Repair(s) by Excavation
 Sectional Liner(s)
It is noted that some pipeline segments include more than one recommended rehabilitation method.
880
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 10 ends

www.hydroscience.com
The highest priority improvements are those segments identified to have significant defects during the condition assessment and thus rated as highest risk of failure. These projects are proposed for immediate improvement (Year 1) to reduce the likelihood of a catastrophic failure and are summarized in Table 10-3. The proposed method of rehabilitation is provided along with the capital cost for the collective improvements.

Table 10-3: Highest Priority Pipe with Significant Defects (Year 1: 2022) Average Risk
Grade Street Name Diameter (in) Length (ft) Material Recommended Rehabilitation Method Construction
Cost

5.0 Coming Ave 8 234 VCP Sectional Liner(s), Point Repair(s) $61,000

5.0 E Calaveras Blvd 15 1305 VCP Sectional Liner(s), Point Repair(s), Full CIPP $273,000

5.0 Just East of S Hillview Dr 15 491 VCP Sectional Liner(s), Full CIPP $103,000

4.0 Curtis Ave 18 172 VCP Sectional Liner(s) $39,000

4.0 Marylinn Dr 27 292 VCP, RCP Pipe Replacement, Full CIPP, Point Repair(s) $131,000

4.0 N Hillview Dr 12 218 VCP Sectional Liner(s) $44,000

4.0 S Main St 18, 21 733 VCP Sectional Liner(s), Point Repair(s) $147,000

4.0 Sinnot Ln 12 398 VCP Full CIPP, Point Repair(s) $139,000 Construction Subtotal $936,000
Construction Contingency 30% $281,000
Engineering Design and Consulting Services 15% $140,000 Permitting and Right of Way (ROW) 7% $66,000
ESDC, Construction Management, & Inspection Services 12% $112,000 Total Year 1 Project Costs $1,536,000

881
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 10 ends

www.hydroscience.com
Additional high- and some medium-priority improvements are recommended for implementation in the first five years after addressing the highest risk improvements shown in Table 10-3. These improvements are listed in Table 10-4 and include the next priority projects, which also combine pipes with rehabilitation needs (of any risk grading) along the same street for efficiency.

Table 10-4: Medium- to High-Priority Improvements (Years 2-5: 2023-2026) Average Risk
Grade Street Name Diameter (in) Length (ft) Material Recommended Rehabilitation Method Construction
Cost

5.0 S Abel St 18 66 VCP Point Repair(s), Sectional Liner(s) $32,000

3.9 Just East of S Hillview Dr1 12, 15 2,947 VCP Full CIPP, Point Repair(s), Sectional Liner(s) $503,000

3.7 N Milpitas Blvd 33, 39 3,062 RCP Full CIPP, Sectional Liner(s) $1,776,000

3.5 Nimitz Fwy and California Cir 18, 42 1,974 VCP, RCP Full CIPP, Sectional Liner(s) $474,000

3.3 E Calaveras Blvd1 12, 15, 18, 21 3,336 VCP Full CIPP, Point Repair(s), Sectional Liner(s) $1,168,000

3.2 Coming Ave1 8 1,374 VCP Full CIPP $358,000
Construction Subtotal $4,311,000
Contingency 30% $1,293,000
Engineering Design and Consulting Services 15% $647,000 Permitting and Right of Way (ROW) 7% $302,000
ESDC, Construction Management, & Inspection Services 12% $517,000 Total Year 2-5 Project Costs $7,070,000
Notes:

1. This street had some rehabilitation addressed in Year 1.

882
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 10 ends

www.hydroscience.com
After addressing all high-priority, and some medium-priority, improvements in the first five years, the remaining medium-priority improvements are proposed for the next five-year period (Years 6-10). These improvements are listed in Table 10-5.

Table 10-5: Medium-Priority Improvements (Years 6-10: 2027-2031) Average Risk
Grade Street Name Diameter (in) Length (ft) Material Recommended Rehabilitation Method Construction
Cost

3.3 S Main St1 18, 21 2,882 VCP Point Repair(s) and Sectional Liner(s) $576,000

2.9 Machado Ave 24, 30 2,939 RCP, VCP Full CIPP, Sectional Liner(s) $1,006,000

2.8 B/w Tramway Dr & Los Pinos
Ave 24, 30 4,473 VCP, RCP Full CIPP, Sectional Liner(s) $2,484,000 Construction Subtotal $4,066,000
Contingency 30% $1,220,000
Engineering Design and Consulting Services 15% $610,000 Permitting and Right of Way (ROW) 7% $285,000
ESDC, Construction Management, & Inspection Services 12% $488,000 Total Year 6-10 Project Costs $6,669,000
Notes:

1. This street had some rehabilitation addressed in Year 1.

Low- and very low-priority improvements are proposed in the longer-term CIP (Years 11-20). The next two five-year increments are proposed in Table 10-6 and Table 10-7. While these pipelines pose a small risk of failure, it is expected that they can continue to operate without significant likelihood of immediate failure. 883
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 10 ends

www.hydroscience.com
Table 10-6: Low-Priority Improvements (Years 11-15: 2032-2036) Average Risk
Grade Street Name Diameter (in) Length (ft) Material Recommended Rehabilitation Method Construction Cost

3.1 Marylinn Dr 27, 30 2,841 RCP, VCP, SS Full CIPP, Pipe Replacement, Point Repair(s), Sectional Liner(s) $1,472,000

3.0 Ames Ave 12 533 VCP Point Repair(s), Sectional Liner(s) $107,000

3.0 Connection b/w N Milpitas Blvd &
Summerwind Way 42 563 RCP Full CIPP, Sectional Liner(s) $176,000

3.0 Curtis Ave 15, 18 1,457 VCP Full CIPP, Pipe Replacement, Point Repair(s), Sectional Liner(s) $572,000

3.0 Gibraltar Dr 12 502 VCP Point Repair(s), Sectional Liner(s) $100,000

3.0 Kennedy Dr 12 276 VCP Full CIPP $82,000

3.0 N Abel St 27 543 VCP Sectional Liner(s) $103,000

3.0 N McCarthy Blvd 18 44 VCP Sectional Liner(s) $31,000

3.0 N Milpitas Blvd 15 423 VCP Sectional Liner(s) $122,000

3.0 River Rock Rd 18 561 VCP, RCP Full CIPP $238,000

3.0 S Abbott Ave 15, 16 285 VCP, CIP Sectional Liner(s), Full CIPP $103,000

3.0 S Milpitas Blvd 8, 12, 18 1,695 VCP Point Repair(s), Sectional Liner(s) $339,000

3.0 Fwy Crossing near Fox Hollow Ct 12 748 VCP Sectional Liner(s) $150,000

3.0 Smithwood St 15 388 VCP Sectional Liner(s) $78,000

3.0 Tramway Dr 12 38 VCP Full CIPP $19,000

3.0 Venus Way 8 46 VCP Point Repair(s) $12,000

3.0 Wool Dr 24 368 VCP Full CIPP $168,000

3.0 Yosemite Dr 8 970 VCP Full CIPP, Pt Repair(s), Sectional Liner(s) $194,000

2.8 Great Mall Dr 15 1,724 VCP Full CIPP, Pt Repair(s), Sectional Liner(s) $448,000

2.7 Connection to SW Community
Starting from W Calaveras Blvd 15 1,419 VCP Full CIPP, Pt Repair(s), Sectional Liner(s) $369,000

2.3 N Hillview Dr 12 833 VCP, DIP Full CIPP, Sectional Liner(s) $208,000 Construction Subtotal $5,090,000
Contingency 30% $1,527,000
Engineering Design and Consulting Services 15% $764,000 Permitting and Right of Way (ROW) 7% $356,000
ESDC, Construction Management, & Inspection Services 12% $611,000 Total Year 11-15 Project Costs $8,348,000
884
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 10 ends

www.hydroscience.com
Table 10-7: Very Low-Priority Improvements (Years 16-20: 2037-2041) Average Risk
Grade Street Name Diameter (in) Length (ft) Material Recommended Rehabilitation Method Construction
Cost

2.0 S Milpitas Blvd 8, 12 893 VCP Sectional Liner(s) $179,000

2.0 Turquoise St 10 275 VCP Point Repair(s) $55,000

2.0 Tramway Dr 12 220 VCP Sectional Liner(s) $44,000

1.0 Connection b/w S Milpitas Blvd
and Gibraltar Ct 12 231 VCP Sectional Liner(s) $46,000

1.0 Meadowland Dr 15 816 Unknown Pipe Replacement and Point Repair(s) $354,000

1.0 Silverlake Dr 15 621 Unknown Full CIPP and Point Repair(s) $161,000

1.0 Wool Dr 24 368 RCP Full CIPP $169,000
Construction Subtotal $1,008,000
Contingency 30% $302,000
Engineering Design and Consulting Services 15% $151,000 Permitting and Right of Way (ROW) 7% $71,000
ESDC, Construction Management, & Inspection Services 12% $121,000 Total Year 16-20 Project Costs $1,653,000
885
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 10 ends

www.hydroscience.com

10.2.3 Lift Station
The Main LS and Venus Way LS were inspected, and major deficiencies were catalogued in the LS Report, as summarized in Section 4.3 and detailed in Appendix A (R&R Study App. K). There are no immediate needs for the Venus Way LS. For the Main LS, the highest scoring deficiencies are identified Table 10-8 and presented in order of priority according to both the condition and performance scores for the specific asset. Per City’s 2019-24 CIP, project 6124, an allowance of $100,000 annual investment from FY 2019-20 through FY 2022-23 is planned to address these rehabilitation needs.

Table 10-8: Main LS Deficiencies
Asset Name Field Assessment/Comments Condition
Score
Performance
Score
Manifold PV #2 Actuator Does not work 5 5
Grinder #1 Excessive vibration and inadequate supports 5 5 Air Vacuum 1 to 15 Cavitation, coating failure, and inadequate supports 5 5
Mag Meter (Flow Meter A)1 Not in operation 4 4
Pump #3 Has exceeded useful life2 4 4
2” Combination Air/Vacuum
Valve None 4 4
Flow Meter B1 Operable, but not accurate 4 4
Variable Frequency Drive P2 No corrosion identified, arc flash labels missing 4 2 Variable Frequency Drive P3
No corrosion identified, confirmed by City that
IGBT was replaced in 2019, arc flash labels
missing
4 2
Variable Frequency Drive P4 No corrosion identified, arc flash labels missing 4 2 Variable Frequency Drive P5
No corrosion identified, confirmed by City that
cooling fans were replaced in 2019, arc flash
labels missing
4 2
Notes:

1. The City is replacing these meters as part of CIP Project 6131: Sanitary Sewer Cathodic Protection Improvements.

2. This pump has logged over 50,000 hours.

10.3 CIP Budget and Schedule
The sewer CIP is funded by the sewer enterprise fund which includes the user rate structure and sewer connection fees. Provided below in Table 10-9 is a proposed budget and schedule for the CIP and recommended projects over 20-years in 5-year increments. The most critical projects are scheduled for earlier implementation. It is noted that the timing of projects can be adjusted based on results of CCTV and future operating conditions. Figure 10-1 presents the proposed improvement projects in 5-year increments.

886
Item # 16.
"
"
§¨¦680
§¨¦880
UV237
N
_
FIGURE 10-1

CITY OF MILPITAS

SEWER MASTER PLAN

CAPITAL IMPROVEMENT PROJECTS
LEGEND
" LIFT STATION
YEAR 1
YEARS 2-5
YEARS 6-10
YEARS 11-15
YEARS 16-20

GRAVITY MAIN
887
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 10 ends

www.hydroscience.com
Table 10-9: Proposed CIP Schedule and Budget
Projects 5-Year
(2022-2026)
10-Year
(2027-2031)
15-Year
(2032-2036)
20-Year
(2037-2041)
Existing Projects
6124 Pump Station Rehabilitation Program $200,0001 -- -- -- 6126 Minor Sewer Projects $200,0002 -- -- --
6130 Main Lift Station Odor Emissions
Control $200,000 -- -- --
6131 Sanitary Sewer Cathodic Protection
Improvements $500,000 -- -- --
6134 On-Call Sewer Maintenance & Repair
Services $98,000 -- -- --
Total Existing Projects $1,198,000 -- -- --
Proposed Projects
CCTV large diameter and high-risk assets $400,000 -- -- -- Highest Priority Improvements $1,536,000 -- -- --
Medium- to High- Priority Improvements $7,070,000 $6,669,000 -- -- Low Priority Improvements -- -- $8,348,000 $1,653,000
Allocation for improvements identified from
ongoing CCTV $1,250,000 $1,250,000 $1,250,000 $1,250,000 Total Proposed Projects $10,256,000 $7,919,000 $9,598,000 $2,903,000 Existing and Proposed Projects $11,454,000 $7,919,000 $9,598,000 $2,903,000 Notes:

1. Original allocation is $200,000 through 2023 with $148,000 in prior year funding from Sewer Infrastructure Fund to be allocated for other projects in FY2020-21.

2. Original allocation is $200,000 with $37,000 in prior year funding from Sewer Infrastructure Fund to be allocated for other projects in FY2020-21.

3. It is noted that costs were reviewed and updated during 2022 to reflect recent cost increases associated with sewer infrastructure projects.

After the projects above were developed, the City contracted with the financial consulting firm Raftelis to develop fiscal impact models and to assess the financial feasibility of the Master Plan projects, beginning FY 2024 through FY 2040. The financial models are intended to evaluate the sewer utility fund revenues and expenses and analyze the impacts of the Master Plan projects on City funds. The Wastewater Financial Plan Options Report is attached as Appendix G.

10.4 Other Recommendations
During the CCTV inspection performed by NPS, there were instances of large grease buildup in various locations throughout the wastewater collection system. As explained previously, the presence of grease buildup and other blockages, particularly at, or near, critical flow splits, can significantly impact collection system operations, particularly at flow splits, which are generally intended to mitigate high flows and provide redundancy. This redundancy aids the system’s ability to handle higher flows during wet weather events and as the water table rises during the wet season. When flow splits are not operating properly, this can drastically impact the system operation, particularly during wet weather events.
888
Item # 16.

City of Milpitas
Sewer Master Plan
January 2021

Page 10 ends

www.hydroscience.com
It is recommended that the City cleans the locations identified as having grease buildup.

Locations should also be vacuumed to remove blockages from moving further downstream. In addition, stricter FOG Control Program guidelines and increased inspections may be necessary to prevent FOG discharges to the wastewater collection system.

It is expected that there will be additional O&M costs related to the following:
 In-house CCTV inspection;
 Additional cleaning related to the act of inspection and as a result of discovering blockages; and
 Implementing a stricter FOG Control Program/increased inspections of grease traps.

In addition to the projects summarized herein, the City is evaluating the need to rehabilitate or replace Force Main A (FM-A), which conveys wastewater from the Main LS to the RWF (see Figure 3-1). Built in 1974, FM-A was identified as requiring inspection because the soils surrounding the pipeline are very corrosive. The City contracted with a third party to perform cleaning and CCTV inspection of FM-A to determine the internal condition. The inspection was not fully completed due to unforeseen obstacles.

It is recommended that the City perform a complete condition assessment of FM-A to verify the internal condition of the pipeline and determine the best options for rehabilitation or replacement.

The City’s report generated by the engineering department is included as Appendix H.

Initial City estimates to rehabilitate or replace FM-A are approximately $1M to complete the force main assessment and maintenance of the appurtenances and an additional $25M to replace the force main. Both of these costs were included as capital projects requiring consideration for an upcoming CIP, in addition to the amounts specified in Section 10.3. 889
Item # 16.
www.hydroscience.com

APPENDIX A
City of Milpitas
Sewer Master Plan Study
Sewer Utility Asset Renewal and Replacement Study
890
Item # 16.
www.hydroscience.com

THIS PAGE INTENTIONALLY LEFT BLANK
891
Item # 16.

Final Report
Limitations:

This document was prepared solely for HydroScience Engineers/City of Milpitas in accordance with professional standards at the time the services were performed and in accordance with the contract between HydroScience Engineers/City of Milpitas and Brown and Caldwell dated October 16, 2019. This document is governed by the specific scope of work authorized by HydroScience Engineers/City of Milpitas; it is not intended to be relied upon by any other party except for regulatory authorities contemplated by the scope of work. We have relied on information or instructions provided by HydroScience Engineers/City of Milpitas and other parties and, unless otherwise expressly indicated, have made no independent investigation as to the validity, completeness, or accuracy of such information. 11020 White Rock Road, Suite 200
Rancho Cordova, CA 95670
T: 916.444.0123
Prepared for: HydroScience Engineers and City of Milpitas Project Title: Milpitas Sewer Master Plan
Project No.: 154251
Final Report
Subject: Sewer Utility Asset Renewal and Replacement Study Date: November 23, 2020
From: Brown and Caldwell
Prepared by: Elton DeSouza, PE (Non-CA)
Timothy Lee, EIT
Reviewed by: Lawrence Catalano, PE (Non-CA)
Sean Kilpatrick, PE (Non-CA)
Approved by: Manjit Saini, PE, C-61948, Exp 09-30-21
892
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
ii
Table of Contents
List of Figures ........................................................................................................................................................... iii List of Tables ............................................................................................................................................................. iv Executive Summary .................................................................................................................................................. 6 Section 1: Introduction ............................................................................................................................................. 3

1.1 Background ...................................................................................................................................................... 3

1.2 Objectives ........................................................................................................................................................ 4 Section 2: Inspection Condition Assessment ......................................................................................................... 5

2.1 Planned Segments and Scope ....................................................................................................................... 5

2.2 Inspection Results (NPS) ................................................................................................................................ 6

2.2.1 Defect Coding ..................................................................................................................................... 8

2.3 Quality Control Review .................................................................................................................................. 11 Section 3: Desktop Condition Assessment Task .................................................................................................. 12

3.1 Likelihood of Failure ...................................................................................................................................... 12

3.2 Consequence of Failure ................................................................................................................................ 16

3.3 Asset Risk ...................................................................................................................................................... 20

3.4 Staff Input ...................................................................................................................................................... 21

3.5 InfoAsset Planner (IAP) .................................................................................................................................. 21

3.6 Risk Assessment Results .............................................................................................................................. 23 Section 4: Renewal and Replacement Plan.......................................................................................................... 36

4.1 Rehabilitation Selection Methodology ......................................................................................................... 36

4.1.1 Defect Codes .................................................................................................................................... 37

4.1.2 Rehabilitation Decision Tree ........................................................................................................... 38

4.1.3 Analysis Quality Check ..................................................................................................................... 40

4.1.4 Staff Input ........................................................................................................................................ 40

4.2 Basis of Cost Assumptions ........................................................................................................................... 41

4.3 Review of Recent Projects ............................................................................................................................ 41

4.4 Lift Station Rehabilitation ............................................................................................................................. 42

4.5 Summary of Recommendations ................................................................................................................... 43

4.5.1 Sewer Main Pipelines ...................................................................................................................... 43

4.5.2 CCTV Inspection ............................................................................................................................... 45

4.5.3 Preliminary Capital Improvement Plan Alternatives Summary ..................................................... 47

4.5.4 Preliminary Sewer Pipeline Capital Improvement Plan – Alternative A ........................................ 48

4.5.5 Preliminary Sewer Pipeline Capital Improvement Plan – Alternative B ....................................... 53

4.5.6 Preliminary Sewer Pipeline Capital Improvement Plan – Alternative C (Recommended) ........... 57

4.5.7 Sewer Lift Station Rehabilitation .................................................................................................... 62

4.5.8 Estimated Construction Cost .......................................................................................................... 62 References .............................................................................................................................................................. 63 893
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
iii
Appendix A: Rehabilitation Table, GIS, and Figures ............................................................................................ A-1 Appendix B: Planned CCTV Inspection Scope ...................................................................................................... B-2 Appendix C: QC Comments Log ............................................................................................................................ C-3 Appendix D: CCTV Structural Scores Map ............................................................................................................ D-1 Appendix E: CCTV O&M Scores Map .................................................................................................................... E-2 Appendix F: Risk Table and GIS ............................................................................................................................ F-3 Appendix G: Risk Maps ......................................................................................................................................... G-4 Appendix H: Defect-Level Rehabilitation Methods .............................................................................................. H-5 Appendix I: GIS Updates ......................................................................................................................................... I-6 Appendix J: Basis of Cost Estimate Details ........................................................................................................... J-9 Appendix K: Main and Venus Way Lift Station Inspections Draft Report, May 2020 .....................................K-10 List of Figures
Figure ES-1: Preliminary Pipe Rehabilitation Recommendations Map ................................................................. 7 Figure 1-1: San Jose-Santa Clara Regional Wastewater Facility Tributary Service Area ..................................... 3 Figure 2-1: CCTV Inspection Map by Contract ........................................................................................................ 6 Figure 2-2: NPS Completed CCTV Inspection ......................................................................................................... 7 Figure 2-3: Overall PACP Peak Score .................................................................................................................... 11 Figure 3-1: LOF Data Map – Material, Liquefaction, Seismic Hazard Zones ...................................................... 14 Figure 3-2: LOF Data Map – Pipe Age ................................................................................................................... 15 Figure 3-3: LOF Scores Map .................................................................................................................................. 16 Figure 3-4: COF Data Map...................................................................................................................................... 19 Figure 3-5: COF Scores ........................................................................................................................................... 20 Figure 3-6: IAP LOF/COF Setup Example - Diameter (1 of 2) .............................................................................. 22 Figure 3-7: IAP LOF/COF Setup Example - Diameter (2 of 2) .............................................................................. 22 Figure 3-8: IAP LOF/COF Weighting and Risk Setup Example ............................................................................. 23 Figure 3-9: Asset Risk Rating ................................................................................................................................. 24 Figure 3-10: Pipeline Risk LOF COF Matrix ........................................................................................................... 25 Figure 3-11: Pipeline Risk Distribution by Length ................................................................................................ 26 Figure 3-12: High Risk Pipes .................................................................................................................................. 30 Figure 3-13: Extreme Risk Pipes – LOF Drivers .................................................................................................... 34 Figure 3-14: Extreme Risk Pipes – COF Drivers ................................................................................................... 34 Figure 4-1: CCTV Prioritization Data Map .............................................................................................................. 36 894
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
iv
Figure 4-2: Rehabilitation Decision Tree ............................................................................................................... 39 Figure 4-3: Example Analysis Quality Check in IAP ............................................................................................... 40 Figure 4-4: Preliminary Pipe Rehabilitation Recommendations Map ................................................................. 44 Figure 4-5: Priority CCTV Areas .............................................................................................................................. 46 List of Tables
Table ES-1. Detailed Rehabilitation Recommendations for Sewer Improvement ................................................ 1 Table ES-2. Preliminary Sewer Pipeline Capital Improvement Plan ...................................................................... 1 Table 2-1. CCTV Inspection Scope ........................................................................................................................... 5 Table 2-2. NPS CCTV Inspection Results ................................................................................................................ 7 Table 2-3. Structural Condition Grade Implications ............................................................................................... 9 Table 2-4. Peak Structural and O&M Scores by Pipe Diameter (NPS CCTV) ........................................................ 9 Table 3-1. LOF Factors and Ratings ...................................................................................................................... 13 Table 3-2. COF and Council Core Value/Priorities ................................................................................................ 16 Table 3-3. COF Factors and Ratings ...................................................................................................................... 18 Table 3-4. At-Risk Pipes ......................................................................................................................................... 27 Table 3-5. Extreme Risk Pipes – Drivers of High LOF and COF Scores ............................................................... 31 Table 4-1. Sample Defect Codes with Associated Rehabilitation Methods ........................................................ 37 Table 4-2. Recent Sewer Utility Improvement Projects ........................................................................................ 41 Table 4-3. Main Lift Station Deficiencies .............................................................................................................. 42 Table 4-4. Preliminary Sewer Pipeline Capital Improvement Plan - Alternative A Summary ............................. 48 Table 4-5. Alternative A CIP – Year 1, Extreme Risk Pipes .................................................................................. 49 Table 4-6. Alternative A CIP – Year 2, High Risk Pipes ........................................................................................ 50 Table 4-7. Alternative A CIP – Years 3-7, Medium Risk Pipes ............................................................................. 51 Table 4-8. Alternative A CIP – Year 8, Low Risk Pipes ......................................................................................... 52 Table 4-9. Preliminary Sewer Pipeline Capital Improvement Plan - Alternative B Summary ............................. 53 Table 4-10. Alternative B CIP – Years 1-4, Streets With Extreme Risk Segments ............................................. 54 Table 4-11. Alternative B CIP – Years 5-6, Streets with High Risk Segments .................................................... 55 Table 4-12. Alternative B CIP – Years 7-8, Medium Risk Pipes .......................................................................... 56 Table 4-13. Alternative B CIP – Year 8, Low Risk Pipes ....................................................................................... 56 895
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
v
Table 4-14. Preliminary Sewer Pipeline Capital Improvement Plan - Alternative C Summary .......................... 57 Table 4-15. Alternative C CIP – Year 1, Extreme Risk Pipes With Significant Defects....................................... 58 Table 4-16. Alternative C CIP – Year 1, High Risk Pipes With Significant Defects ............................................. 58 Table 4-17. Alternative C CIP – Years 1-3, Streets with Extreme Risk Segments .............................................. 59 Table 4-18. Alternative C CIP – Year 4, Streets with High Risk Segments ......................................................... 60 Table 4-19. Alternative C CIP – Years 5-7, Medium Risk Pipes .......................................................................... 61 Table 4-20. Alternative C CIP – Year 8, Low Risk Pipes ....................................................................................... 61 896
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
6 Executive Summary
As a part of the City of Milpitas’ (City) Sewer Master Plan, Brown and Caldwell (BC) has been retained to develop a Sewer Utility Asset Renewal and Replacement (R&R) Study. The intent of the R&R Study is to provide the City with priorities for upcoming asset renewal and replacement projects given a fixed yearly budget.

Closed-circuit television (CCTV) was utilized to visually assess the sewer’s condition. Resulting CCTV review was summarized and cataloged according to National Association of Sewer Service Company’s (NASSCO) Pipeline Assessment and Certification Program (PACP) structural and operations and maintenance (O&M) grades in Section 2. Additionally, a desktop condition assessment was performed for all pipe segments using likelihood of failure (LOF) and consequence of failure (COF) criteria described in Section 3. This collective analysis revealed that of the approximately 105,000 linear feet (LF) (449 sewer segments) of sewer gravity pipeline inspected, approximately 50,000 LF (178 sewer segments) require system improvements totaling approximately $17 million of construction costs. Of the remaining 685,000 LF segments with no inspection data, desktop risk assessment determined that 55,000 LF of medium to extreme risk pipes and/or large diameter pipes (24-inch diameter pipe or larger) require CCTV or sonar inspection totaling approximately $400,000. System improvements and CCTV inspection recommendations total to $17.4 million. These proposed improvements are illustrated on Figure ES-1.
897
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
7 Figure ES-1: Preliminary Pipe Rehabilitation Recommendations Map 898
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
1 Table ES-1 presents a summary of the overall CCTV and rehabilitation recommendations with associated Association for the Advancement of Cost Engineering (AACE) Class 5 cost estimate. Note that the presented costs are budgetary construction costs and do not include engineering, permitting, legal, administrative, or other planning costs typical of budgetary capital improvement planning.

Table ES-1. Detailed Rehabilitation Recommendations for Sewer Improvement Rehabilitation Action Construction Cost
CCTV $400,000
Full Cured-In-Place Pipe (CIPP) $8,900,000
Full CIPP+Point Repair Exc(s) $1,400,000
No Action $0
Point Repair Excavation(s) $300,000
Pipe Replacement1 $2,400,000
Sec Liner(s)+Point Repair Exc(s) $1,400,000
Sectional Liner(s) $2,600,000
Total Construction Cost2
(Class 5 Estimate)
$17,400,000
1Loaded cost including costs associated with earthwork, demolition, sheeting, shoring & bracing, paving, and testing and commissioning. Pavement repair assumes minimum four-foot-wide trench per running foot. 2Contingencies amounting to 45% are included in the estimate (5% Mobilization/Demobilization, 10% Sewer Bypassing, 30% Construction Cost and Market Contingency). Additionally, traffic control during construction amounting to $10,000 to $30,000 depending on roadway traffic rating was also assumed. Administrative, engineering, or other planning costs typical of CIP planning are not included.

These rehabilitation recommendations are divided into capital improvement program (CIP) phases below in Table ES-2 in correspondence with the City’s $2,000,000 annual rehabilitation budget when feasible.

Although years 2 and 3 propose rehabilitations exceeding the budget, crucial rehabilitation of extreme and select high risk pipes help to minimize costly pipe failures. In addition, years 4 through 8 feature a rehabilitation plan requiring less budget to offset the previous expenditures.

Table ES-2. Preliminary Sewer Pipeline Capital Improvement Plan Year Description Construction Cost1 Construction Cost Per Year
1 Rehabilitate Extreme and High Risk Pipes with Significant Defects $1,300,000 $3,000,000 CCTV Large Diameter and Medium to Extreme Risk Pipes $400,000 1-3 Rehabilitate Extreme Risk Pipes and Pipes Along the Same Street Requiring Rehabilitation $7,400,000
4 Rehabilitate High Risk Pipes and Pipes Along the Same Street $1,900,000 - 5-7 Rehabilitate Medium Risk Pipes and Pipes Along the Same Street $5,400,000 $1,800,000 8 Rehabilitate Low Risk Streets $1,000,000 -
1Assets are rated from 1 (negligible) to 5 (extreme) based on available survey data and desktop condition assessment results. 2Contingencies amounting to 45% are included in the cost estimate (5% Mobilization/Demobilization, 10% Sewer Bypassing, 30% Construction Cost and Market Contingency). Additionally, traffic control during construction amounting to $10,000 to $30,000 depending on roadway traffic rating was also assumed. Administrative, engineering, or other planning costs typical of CIP planning are not included.
899
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
2 The CIP phases are described in more detail in Section 4.5. Additionally, the rehabilitation recommendations for each asset is included in graphic information system (GIS) and tabular format in Appendix A. Recommendations are subject to change depending on future discussions with operational staff to determine rehabilitation preferences of the various levels and types of defects. The methodology and rehabilitation selection process is detailed in Section 4.1. The cost assumptions and sources are listed in Section 4.2 and Appendix J; detailed cost estimates are recommended when further CIP budgeting and planning takes place. 900
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
3 Section 1: Introduction
The intent of this Sewer Utility Asset Renewal and Replacement (R&R) Study is to provide the City of Milpitas (City) with priorities for asset renewal and replacement. A part of the evaluation included developing an understanding of the relative risk of failure for the City’s sewer gravity pipeline segments by performing a likelihood and consequence of failure analysis. Understanding the relative risk of failure for various sewer pipeline sections is critical to effectively plan sewer capital improvement projects by prioritizing the highest risk projects. Brown and Caldwell (BC) worked closely with City staff and HydroScience Engineers (HSE) to develop an appropriate failure ranking and weighting system to predict risk of failure. In general, overall risk of failure was determined by considering both pipe characteristics (age, material, depth, location, presence of obstructions, etc.) and internal pipe video inspection findings.

1.1 Background
The City of Milpitas is located within the San Francisco Bay Area, north of San Jose, California. All wastewater produced in the City is treated at the San Jose–Santa Clara Regional Wastewater Facility (RWF), the largest advanced wastewater treatment facility in the western United States. The City’s sewer system serves over 77,000 customers and consists of 0.95 million linear feet (LF) of underground pipeline, including 26,400 LF of force main pipeline (Milpitas Wastewater Fact Sheet, Water and Sewer System Information). Wastewater is conveyed to RWF through two large pump stations, the Venus station and the Main Sewer pump station (Milpitas Wastewater Fact Sheet). A map of RWF’s tributary agencies, provided by the City of San Jose, can be found in Figure 1-1 (City of San Jose). Recycled water, which is produced at RWF, is returned to the City for use in non-drinking water applications, such as irrigation of golf courses and agricultural land. Recycled water pipelines, shown as purple pipes in Figure 1-1, are not included in this analysis.

Figure 1-1: San Jose-Santa Clara Regional Wastewater Facility Tributary Service Area 901
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
4 1.2 Objectives
The objective of the Sewer Utility Asset R&R Study is to provide the City with applicable sewer condition and risk information to support prioritization of asset renewal and replacement. Core values and priority areas, established by City Council, guide the evaluation of risk and consequence in order to meet the City’s mission and performance levels.

Objectives associated with this report are presented below.

Summarize condtion
assessment findings
Utilize LoF and CoF
analyses to develop risk
management guidelines
and recommendations
Develop and prioritize
R&R projects based on
asset risk and previously
identified projects
Develop R&R project cost
estimates to fulfill
recommendations
902
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
5 Section 2: Inspection Condition Assessment
Understanding the internal pipe condition (presence of structural and operational & maintenance (O&M) defects) is critical to understanding asset condition and likelihood of failure. Closed-circuit television (CCTV) inspection was utilized to assess the internal condition of the key pipeline segments. Key pipeline segments were defined as follows:
• Diameters greater than 8 inches
• Located within traffic impacted areas
• Located within commercial/industrial areas.

Due to budget limitations, the CCTV efforts were divided between a subcontractor, National Plant Services, Inc (NPS), and the City. NPS completed their portion of CCTV inspections between March and May of 2020.

The City was unable to complete its portion of the CCTV inspection due to Coronavirus restrictions, therefore that portion of the information was not available for this analysis. Approximately 105,000 LF of CCTV inspection data was collected by NPS.

2.1 Planned Segments and Scope
NPS’ work was subdivided into six planned inspection contracts shown in Table 2-1. Figure 2-1 details the division of the contracts, as well as the sewer segments scheduled to be inspected by the City. The detailed planned CCTV inspection scope can be found in Appendix B.

Table 2-1. CCTV Inspection Scope
Inspection
Responsibility Inspection Contract Pipe Material Pipe Diameter Number of Segments Total Length NPS
Contract Trunk 1 RCP
33-inch, 36-inch, 39-
inch, 42-inch, 54-inch
and 66-inch
37 8,830 LF
Contract Trunk 2 RCP and VCP 27-inch and 33-inch 24 5,760 LF Contract Trunk 3 RCP and VCP 24-inch and 30-inch 15 4,850 LF Contract 16-24 Inch Mostly VCP 16-inch, 18-inch, 21-
inch and 24-inch 62 16,610 LF
Contract 10-15 Inch Mostly VCP 10-inch, 12-inch and
15-inch 119 34,930 LF
Contract 8-Inch Mostly VCP 8-inch 184 51,350 LF
Subcontractor Total 441 122,330 LF
City N/A VCP Primarily 6-inch and 8-
inch 389 98,750 LF
*RCP = reinforced concrete pipe
*VCP = vitrified clay pipe
903
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
6 Figure 2-1: CCTV Inspection Map by Contract
In addition to CCTV, a two-dimensional laser and sonar inspection was to be performed as part of Contract Trunk 1. Due to scheduling conflicts, this work was not completed.

2.2 Inspection Results (NPS)
NPS successfully inspected 105,221 LF of their contracted 122,330 LF of sewer pipeline. NPS reported that pipes were unable to be completely inspected for multiple reasons, including presence of siphons (requiring extra equipment), root balls, grease, rocks, and other debris preventing complete inspection. The inspected segments are shown in green on Figure 2-2.
904
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
7 Figure 2-2: NPS Completed CCTV Inspection
Details of the NPS CCTV inspection performed by pipe diameter are presented in Table 2-2.

Table 2-2. NPS CCTV Inspection Results
Pipe Diameter Distance of Inspection Performed
6-Inch N/A
8-Inch 8,211 LF
10-Inch 3,540 LF
12-Inch 19,003 LF
15-Inch 25,552 LF
16-Inch 195 LF
18-Inch 15,292 LF
21-Inch 10,268 LF
905
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
8 Table 2-2. NPS CCTV Inspection Results
Pipe Diameter Distance of Inspection Performed
24-Inch 1,995 LF
27-Inch 5,337 LF
30-Inch 7,393 LF
33-Inch 574 LF
36-Inch 0 LF
39-Inch 2,487 LF
42-Inch 2,547 LF
48-Inch 0 LF
54-Inch 0 LF
66-Inch 1,037 LF
Size Unknown 1,788 LF
Total Pipe Inspected 105,221 LF

2.2.1 Defect Coding
The National Association of Sewer Service Company’s (NASSCO) Pipeline Assessment Certification Program (PACP) was utilized to assess sewer pipeline condition and identify defects. All pipeline segments were coded by NPS staff who had been PACP-certified. Additionally, approximately 20 percent of the pipe (89 out of 449 pipe segments) CCTV and PACP reports were reviewed by PACP-certified BC personnel, as part of BC’s quality control (QC) process. BC noted minor issues with the condition assessment data collection or data review and forwarded summary of this review to HSE. Further details regarding the QC process can be found in Section 2.3.

The condition assessment of pipelines consists of:
• Identifying defects along each pipeline segment through visual inspection • Assigning individual grades to each defect based on the type and severity • Developing an overall Condition Grade for each pipeline segment by assessing type and number of defects along the pipeline segment
• Assigning a final Condition Rating to each pipeline segment based on the condition grades and the potential for further deterioration and/or failure
Under PACP, defects are categorized as either structural or O&M related. Structural defects are those that directly impair the structural condition of the pipeline, such as joint separation, joint deflections, cracks, fractures, broken and collapsed pipe or wall, corrosion, worn inverts, and sag conditions. Structural defects are those that are typically addressed through repairs, rehabilitation, or replacement. O&M defects include a range of conditions that can either directly affect the performance of the sewer or are indicators of potential future structural defects. O&M conditions include debris, grease, infiltration, intrusions (root or service laterals), and hydraulic problems. O&M defects are typically addressed through maintenance, although some (such as infiltration) may require additional rehabilitation.

In general, PACP grades range from 1 to 5, with 1 being a minor defect grade and 5 being the most significant defect grade. Table 2-3 provides a description of the defect related to the condition grade it receives. 906
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
9 Table 2-3. Structural Condition Grade Implications
Condition
Grade
Condition
Rating Defect Description
1 Mild
Minor defects
2 Defects that have not begun to deteriorate
3 Moderate Moderate defects that will continue to deteriorate 4 Severe
Severe defects that will become Grade 5 defects within the foreseeable future 5 Defects requiring attention soon
When rating the condition of a pipe, three factors best characterize the inspection results. • Structural Peak Score - The highest rated condition grade for structural defects present in a pipe • O&M Peak Score - The highest rated condition grade for O&M defects present in a pipe • Peak Score - The greater of structural peak score and O&M peak score Table 2-4 presents the peak structural and O&M scores by pipe diameter.

Table 2-4. Peak Structural and O&M Scores by Pipe Diameter (NPS CCTV) Pipe
Diameter
Structural
Peak Score
Total Pipe
Length
(LF)
O&M
Peak
Score
Total Pipe
Length (LF)
Pipe
Diameter,
Continued
Structural
Peak Score
Total Pipe
Length (LF)
O&M Peak
Score
Total Pipe
Length (LF)
8-Inch
0 514 0 0
27-Inch
0 149 0 40
1 0 1 340 1 0 1 486
2 5,177 2 3,541 2 3,010 2 1,167
3 1,915 3 860 3 1,087 3 1,834
4 46 4 2,415 4 0 4 1,808
5 560 5 1,055 5 1,090 5 0
10-Inch
0 117 0 511
30-Inch
0 598 0 1,226
1 0 1 0 1 24 1 622
2 1,769 2 2,095 2 4,738 2 3,627
3 1,654 3 934 3 2,034 3 832
4 0 4 0 4 0 4 522
5 0 5 0 5 0 5 564
12-Inch
0 2,047 0 367
33-Inch
0 0 0 0
1 0 1 347 1 0 1 0
2 11,782 2 7,766 2 574 2 0
3 2,956 3 3,339 3 0 3 0
4 1,692 4 4,262 4 0 4 374
5 526 5 2,922 5 0 5 201
907
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
10 Table 2-4. Peak Structural and O&M Scores by Pipe Diameter (NPS CCTV) Pipe
Diameter
Structural
Peak Score
Total Pipe
Length
(LF)
O&M
Peak
Score
Total Pipe
Length (LF)
Pipe
Diameter,
Continued
Structural
Peak Score
Total Pipe
Length (LF)
O&M Peak
Score
Total Pipe
Length (LF)
15-Inch
0 2,269 0 800
39-Inch
0 0 0 0
1 0 1 0 1 0 1 0
2 11,898 2 11,980 2 1,073 2 0
3 5,680 3 3,450 3 1,415 3 634
4 1,409 4 6,909 4 0 4 1,049
5 4,296 5 2,413 5 0 5 805
16-Inch
0 127 0 0
42-Inch
0 399 0 268
1 0 1 0 1 0 1 0
2 0 2 0 2 977 2 0
3 69 3 0 3 1,171 3 569
4 0 4 69 4 0 4 1,709
5 0 5 127 5 0 5 0
18-Inch
0 1,368 0 716
66-Inch
0 609 0 0
1 66 1 826 1 0 1 0
2 7,774 2 4,616 2 0 2 917
3 3,996 3 3,610 3 428 3 120
4 996 4 3,124 4 0 4 0
5 1,093 5 2,399 5 0 5 0
21-Inch
0 852 0 0
Unknown
Diameter
0 169 0 106
1 0 1 0 1 0 1 124
2 7,113 2 6,136 2 1,274 2 672
3 1,977 3 1,682 3 346 3 7
4 326 4 1,721 4 0 4 824
5 0 5 728 5 0 5 55
24-Inch
0 0 0 305
Total
0 9,218 0 4,339
1 85 1 368 1 175 1 3,113
2 1,543 2 35 2 58,702 2 42,552
3 368 3 537 3 25,096 3 18,408
4 0 4 0 4 4,469 4 24,786
5 0 5 750 5 7,565 5 12,019
A map of the overall peak score by pipe segment can be found in Figure 2-3. Appendices D and E provide Structural and O&M score maps, respectively.
908
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
11 Figure 2-3: Overall PACP Peak Score

2.3 Quality Control Review
Following CCTV inspection, the CCTV database was imported into InfoAsset Manager (IAM) to compare CCTV data to existing geographic information system (GIS) data. After the import, several QC queries were performed to confirm that CCTV data was appropriately matched with existing GIS data. For example, a conflict between CCTV data and GIS data can occur when a new structure is found in the field, or when a structure in the GIS is verified to not to exist on CCTV. Once QC in IAM was completed, the data with updated manhole and pipe connectivity (as confirmed by CCTV) was exported for use in InfoAsset Planner (IAP). Updated GIS data was made available for HSE to update their model and maps.

The QC review of CCTV and PACP reports was performed on approximately 20 percent of the pipe segments.

In general, several videos were found to be blurry or unfocused. These were noted in the QC Comment Log, included as Appendix C. Primary QC efforts targeted pipe segments with structural peak grades of four or five because of the high likelihood of these segments requiring repair or improvements. Pipe wall loss due to corrosion, of varying severities, was found throughout the collection system, which is not unexpected in sanitary systems comprised of concrete pipes. Infiltration was observed in some locations, and a few pipe breaks and holes with visible voids were identified. Specific QC comments can be found in the QC Comment Log (Appendix C).
909
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
12 Section 3: Desktop Condition Assessment Task
For all pipe segments, a desktop condition assessment analysis was performed to assess asset risk. The overall risk of pipeline failure is determined by considering both the likelihood that an asset is unable to provide the function for which it was installed, as well as the consequence or impacts resulting from failure of the asset.

Overall likelihood of failure (LOF) and consequence of failure (COF) scores were determined by considering both factor ratings and factor weightings. The LOF factor rating predicts how likely an asset is to fail and the consequence factor rating predicts how consequential an asset failure would be. Assigned factor ratings range between one and five, with one being the least likely to fail/least consequential and five being the most likely to fail/most consequential.

The likelihood/consequence factor weighting is an assigned value which reflects the relative importance of a specific factor category compared to other factor categories. Critical factors are assigned greater weighting values than less critical factors.

The following equations provide basis for determining risk scores.

3.1 Likelihood of Failure
The LOF analysis predicts the likelihood that an asset is unable to provide the function for which it was installed determined by assigned ratings and weightings. The factors selected for analysis are typical for sewer renewal/replacement projects.

Asset characteristics, asset condition and asset location were all considered during the LOF analysis. In all cases, unknown data was assigned medium risk. Specifically, the following factors were used (data sources included in parentheses):
• Pipe Age - In general, as a pipe ages, it has a higher likelihood to fail (pipe age provided by City GIS). • Pipe Material – Different pipe material has different life expectancy and failure modes (pipe material provided by City GIS).
• Structural Condition, if available – Known structural defects based on 2020 CCTV survey performed by NPS.
• Presence of Pipe Obstructions (roots, grease, debris, infiltration, etc.), if available - Known O&M related defects based on 2020 CCTV survey performed by NPS. • Required Pipe Cleaning – Pipes requiring higher cleaning frequency oftentimes experience problems when not maintained. However, the act of cleaning (with high pressure jets of water at a minimum) can cause premature failure and inadvertently remove the top layer of potentially corroded concrete or metal pipe (cleaning frequency provided by City).

Risk = LOF Score x COF Score
LOF Score = ∑ (LOF Rating x LOF Weighting) COF Score = ∑ (COF Rating x COF Weighting) 910
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
13 • Proximity to Landslide Zones - Landslides can pose a threat to pipe segments which are surface pipelines or buried at a depth of three feet or less (Baum, 2008). This factor also accounts for the impact of smaller seismic events on pipe structural integrity ((Landslide Zone) County of Santa Clara Department of Planning and Development).
• Proximity to Earthquake Faults – Pipes located in the Hayward Fault zone are rated higher likelihood to fail. This factor also accounts for the impact of smaller seismic events on pipe structural integrity ((Fault Zone) County of Santa Clara Department of Planning and Development). • Local Geology (Liquefaction) – A liquefaction layer from County GIS provides soil resiliency ratings to seismic events. This factor accounts for the impact of smaller seismic events on pipe structural integrity ((Liquefaction Rating) County of Santa Clara Department of Planning and Development).

Details and scoring basis for each factor are elaborated in Table 3-1.

Table 3-1. LOF Factors and Ratings
Broad Category LOF Factor
LOF Rating
Factor
Weighting
1 (Least
Likely to
Fail)
2 3 4 5
(Most Likely to Fail)
Asset
Characteristics
Age (Installation Year)
Installed
after 2000
Installed
between 1985
and 1999
Installed between
1970 and 19841
Installed between
1955 and 1969 Installed before 1954 2
Pipe Material
Force
main,

HDPE, PVC
VCP1

RCP, STL, DIP, ABS,
PPR - ACP, CIP 2
Asset Condition
Structural PACP
Grade/Defect
Type
Grade 2
defect(s)
or lower
Grade 3
defect(s)
(except hinge
defects)
One Grade 4 defect
(except hinge
defects) or Grade 3
hinge defect
One Grade 5 defect
(except
soil/void/collapse
deformation greater
than 10%) or multiple
Grade 4 defects or
Grade 4 hinge defect
Multiple Grade 5
defects or one Grade 5
defects
(soil/void/collapse
deformation greater
than 10%)
5 O&M PACP
Grade
Grade 2
defect(s)
or lower
Grade 3
defect(s) One Grade 4 defect
One Grade 5 defect or
multiple Grade 4
defects
Multiple Grade 5
defects 5
Required Pipe
Cleaning -
Requires
annual
cleaning
Requires quarterly
cleaning
Requires monthly
cleaning
Requires weekly
cleaning 5
Asset Location
Proximity to
Landslide Zone
Not within
landslide
zone
- - - Within landslide zone 3
Proximity to
Earthquake
Faults
Not within
fault area - - -
Crossing or within
fault area 3
Likelihood of
Liquefaction - - Prone to liquefaction High likelihood of liquefaction
Very high likelihood of
liquefaction 3
1If characteristic is unknown, classify as this rating.

ABS = Acrylonitrile Butadiene Styrene DIP = Ductile Iron Pipe PVC = Polyvinyl Chloride VCP = Vitrified Clay Pipe ACP = Asbestos Cement Pipe HDPE = High-Density Polyethylene RCP = Reinforced Concrete Pipe CIP = Cast Iron Pipe PPR = Polypropylene Pipe STL = Steel Pipe 911
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
14 Figures 3-1 and 3-2 display the LOF Factors in relation with the sewer main pipelines. CCTV inspection data was previously shown in Section 2.2.

Figure 3-1: LOF Data Map – Material, Liquefaction, Seismic Hazard Zones 912
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
15 Figure 3-2: LOF Data Map – Pipe Age
913
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
16 Figure 3-3 provides the LOF scores.

Figure 3-3: LOF Scores Map

3.2 Consequence of Failure
The COF analysis predicts the impact resulting from the failure of an asset by assigned ratings and weightings. Service interruptions, repair/overflow potential, transportation/transit, response time of potential failure, cost of potential failure, and environmental impacts were all considered during the COF analysis.

In a similar fashion to the LOF analysis, the factors selected for analysis are typical for sewer renewal/replacement projects and were selected to ensure the pipe rehabilitation prioritization aligned with City Council core values and priorities. The COF and City Council core values and priorities are shown in Table 3-

2. Certain consequence factors, such as pipe diameter or road type, quantify multiple council core values. As a result, these factors received a higher factor weighting value.

Table 3-2. COF and Council Core Value/Priorities
Council Core Value/
Priority Area
Organization
Category Measure of Failure Consequence Factor
Superior Customer Service
Community
(1) Sewer service interruptions to large areas Pipe diameter Integrity and Accountability (2) Sewer service interruptions to critical and educational facilities Critical facilities (proximity)
Trust and Respect (3) Magnitude and method of public response (sewer size) Pipe diameter Transportation and Transit (4) Public transit service and traffic interruptions Road type 914
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
17 Table 3-2. COF and Council Core Value/Priorities
Council Core Value/
Priority Area
Organization
Category Measure of Failure Consequence Factor
(5) Railroad interruptions Railroad proximity
Governance and
Administration
Financial
(6) Response time to restore an asset Easement (access restriction), road type
(7) Restoration costs or impact on utility rates Pipe diameter and depth Environment Environment (8) State and Federal regulatory violations or public response (discharge to surface water)
Waterway/waterbody
(proximity)
Due to public health and environmental concerns, the potential for waterway/waterbody leaks and road type were weighted most heavily followed by pipe diameter and access restriction. Additional COF factor descriptions and data sources are provided below:
• Sewer Size (Pipe Diameter) – Larger diameter pipes are more expensive to replace and provide a greater service area than smaller diameter pipes (pipe diameter provided by City GIS). • Proximity to Critical Facilities – Pipe proximity to an educational, police, fire, or health facility was calculated and rated for COF. Facilities were searched from Google Maps and geocoded onto the ArcGIS platform. Pipelines servicing critical facilities were approximated by using a buffer of 500 feet. For context, the facility addresses were plotted as a point, so the buffer of 500 feet accounts for building size and nearby critical pipes.
• Road Type – Different road types such as arterial or highway will impact more people than a neighborhood street. Therefore, pipe intersections with major traffic conveyance routes such as the Bay Area Rapid Transit Milpitas station, freeways, state routes, arterial streets, or major roads were determined. The GIS used for major roads was downloaded from County of Santa Clara ((Major Roads) County of Santa Clara Department of Planning and Development). The BART GIS was downloaded from BART website and a buffer of 800 feet was applied to the geocoded coordinate point to capture the frontage and segments adjacent to the frontage. A buffer of 35 feet was applied to the major roads layer to capture potential overflow impact and GIS alignment differences between the road type and pipe layers.
• Railroad Proximity – Impacts to railroad operations and repairs on railroad property have significant cost and permitting impacts (railroad GIS provided by United States Geological Survey (USGS) (USGS National Transportation Dataset for California)).
• Easement (Access Restriction) – Access restrictions were determined by overlaying the city GIS over an aerial base map and manually assigning pipes which appeared to be in private property or restricted areas. For example, the parking lot of a shopping mall would be assigned private but not restricted. However, if a pipe is near a swale between a park and a neighborhood, or between two properties, it was assigned “restricted access”. In a further analysis, parcels with easement information could provide a more refined outcome. • Pipeline Depth – Calculated by subtracting pipe inverts from manhole rim elevations from City GIS. • Proximity to Waterway or Waterbody – Significant permitting impacts for repair or cleanup of failed pipe (waterway/waterbody GIS provided by USGS (National Hydrography Dataset, 2019)).

Details and scoring basis for each factor are elaborated in Table 3-3. 915
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
18 Table 3-3. COF Factors and Ratings
Broad
Category Group COF Factor
COF Rating Factor
Weighting 1
(Negligible
Consequence)
2 (Minimal
Consequence)
3 (Moderate
Consequence)
4 (Severe
Consequence)
5 (Critical
Consequence)
Community
Service
Interruptions
and Overflow Potential
Pipeline
Diameter1,3
Less than 6-
inches
8- to 12-
inches4
14- to 18-
inches
18- to 24-
inches
Greater than 24-
inches 1
Critical
Facilities - - School Fire/Police Hospital 1
Transportation/
Transit
Road Type1,2 Neighborhood
streets
Collector
streets Arterial streets Expressway and state routes Freeway or BART   1 Railroad
Proximity
Not crossing or
within 50 feet of
railroad
- - -
Crossing or withing
50 feet of railroad 1
Financial
Response Time
Access
Restriction Public ROW -
Private
property - Limited access 2
Road
Type1,2
Neighborhood
streets
Collector
streets Arterial streets Expressway and state routes Freeways 2 Pipeline Cost
Pipeline
Diameter1,3
Less than 6-
inches
8- to 12-
inches4
14- to 18-
inches
18- to 24-
inches
Greater than 24-
inches 1
Pipeline
Depth All others - - -
Greater than 10
feet (or special
configuration
requiring
substantial
excavation)
1 Environment Environment
Waterway
or waterbody -
Within 250’ of
waterway or
waterbody
Within 100’ of
waterway or
waterbody
Within 50’ of
waterway or
waterbody
Crossing waterway
or waterbody 3
1Pipe diameter and road type affect the consequence of a pipe failure in both the community and financial broad categories 2Road type weighting = 1+2 = 3; 1 (Transportation/transit) + 2 (Response Time) = 3 (Overall Road Type weighting). 3Pipe diameter weighting=1+1=2; 1 (Service Interruptions and Overflow Potential) + 1 (Pipeline Cost) = 2 (Overall Pipe Diameter weighting). 4If characteristic is unknown, classify as this rating.

ROW = right-of-way
Figure 3-4 shows COF factors on a map and Figure 3-5 provides COF Scores. 916
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
19 Figure 3-4: COF Data Map
917
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
20 Figure 3-5: COF Scores

3.3 Asset Risk
Once the LOF and COF rating and weighting have been determined for individual factors, an overall LOF score and overall COF score can be determined by summing the factor scores. Multiplying the two overall scores determines the overall asset risk (Risk = LOF x COF). Asset risk is considered negligible, low, medium, high or extreme based on the paired LOF and COF data. The matrix below illustrates the risk assignments for varying LOF and COF pairings.

Low LOF Score High LOF Score
High COF
Score

Low COF
Score
Medium Medium High Extreme Extreme
Medium Medium Medium High Extreme
Low Medium Medium Medium High
Negligible Low Medium Medium Medium
Negligible Negligible Low Medium Medium
918
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
21 3.4 Staff Input
A risk assessment workshop between HSE, BC and City staff was conducted on April 24, 2020. The purpose of this workshop was to provide an overview of the risk assessment approach and to receive City input regarding specific risk assessment criteria and weighting. At this workshop the final LOF and COF criteria and weighting were reviewed. Following the workshop, BC sent a proposed criteria and weighting document, to which the City agreed on. Key comments were summarized below:
• Seismic events are fairly unlikely; use caution to weigh the proximity to earthquake faults factor too highly.
o Noted. City to confirm draft LOF and COF weighting shown in this draft report. • Bay Area Rapid Transit (BART) is very critical. This is regarding discussion of “road type/transit” COF factor.
o Draft report #1 comment - the addition of BART will be investigated in between draft and final report. o Final report - BART was added to the road type/transit COF factor and report content was revised accordingly. • City confirmed that repairs to pipe on freeway/highway is challenging. o Action - Incorporated in criteria. Pipes within 35 feet of freeways are assigned the highest COF factor for the road type.
• Sewer pipelines are relatively new, so it may be hard to provide much input on historical data. o Noted. CCTV survey and other desktop condition assessment factors will drive pipe rehabilitation and inspection recommendations. • City decided to rate pipes that would go directly to a waterway/waterbody higher. o Action - Incorporated in rating and weighting. Pipelines near waterway/waterbodies are rated by proximity. The factor measuring waterway/waterbody proximity was most highly weighted.

3.5 InfoAsset Planner (IAP)
A desktop risk assessment was performed using Innovyze’s IAP program, a GIS extension tool. Using the criteria described in Sections 3.1 and 3.2, LOF analysis predicts the probability that each asset could fail based on its GIS data and spatial interaction with other GIS layers. All assets, with or without CCTV data, were evaluated in detail using:
1) GIS data, such as age, material, and diameter
2) County or USGS GIS layers such as seismic hazards, soil stability, waterways, and other factors 3) Maintenance data - required pipe cleaning factor
4) CCTV data when available
For example, for the structural condition and presence of pipe obstruction LOF factors, CCTV data was analyzed to mass compute LOF for each of the approximate 3,200 pipes based on structural and O&M defects. Likewise, COF analysis determines the severity of each asset if it were to fail. The tool scores each pipe for COF based on asset data such as diameter and proximity to other GIS layers such as waterways or hospitals. Each LOF and COF factor is first set up in individual modules by choosing to use asset data, CCTV survey results, or spatial analysis with other GIS layers. Then, buffers and score criteria are defined. Once this is setup, the risk analysis takes user input for weighting of these factors relative to one another and 919
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
22 produces a holistic risk score for each pipe GIS asset. Screenshots of IAP modules can be found in Figures 3- 6 to 3-8.

Figure 3-6: IAP LOF/COF Setup Example - Diameter (1 of 2) Figure 3-7: IAP LOF/COF Setup Example - Diameter (2 of 2) 920
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
23 Figure 3-8: IAP LOF/COF Weighting and Risk Setup Example

3.6 Risk Assessment Results
Overall LOF and COF score assignments were determined for all pipe segments, based on the criteria outlined in Tables 3-1 and 3-3. A total risk score was then determined from the product of the overall LOF and COF scores, which was then normalized within the dataset from one (negligible risk) to five (extreme risk).

Figure 3-9 presents the risk scores for all gravity main pipelines. 921
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
24 Figure 3-9: Asset Risk Rating
922
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
25 A risk matrix for the pipe segments is presented in Figure 3-10. The bottom left tile represents the subset of pipes with the least risk while the top right tile represents the subset of pipes with the most risk. Risk is colorized as follows:
• Blue – Negligible risk
• Green – Low risk
• Peach – Medium risk
• Magenta – High risk
• Dark Red – Extreme risk
Figure 3-10: Pipeline Risk LOF COF Matrix
Figure 3-11 provides the risk distribution for the pipe segments. The majority of the pipe segments are classified as negligible or low risk; twelve percent are medium to extreme risk pipe segments. 923
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
26 Figure 3-11: Pipeline Risk Distribution by Length
For the pipeline risk distribution figure, the “blank” category is attributed to 22 pipes whose GIS segments had blank facility ID, diameter, installation date, and material fields. Table 3-4 below shows the pipe segments with the highest risk scores. This includes all pipes with risk scores of 4 or 5. Appendix F provides the risk scores for all pipe segments. LOF and COF scores are calculated based on the equation figure at the beginning of Section 3 and the rating and weighting criteria described in Table 3-1 and 3-3 in previous sections. The risk score column is calculated by multiplying the LOF score and COF score, which is then normalized from 1 through 5 in the last column (1- negligible, 2-low, 3- medium, 4- high or 5- extreme). The table is sorted by descending risk score.
77%
10%
10%
1% 1% 1%
Pipeline Risk Distribution
1-Negligible 2-Low 3-Medium 4-High 5-Extreme blank (no facility ID) 924
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
27 Table 3-4. At-Risk Pipes
Segment ID Street Name Install Year Pipe Diameter Pipe Material Segment Length (LF) LOF Score COF Score Risk Score (LOF x COF) Asset Risk (Normalized from 1 to 5) 10395-10396 Coming Ave 1954 8 VCP 284 76 39 2964 5 - Extreme12717-12718 E Calaveras Blvd - 15 VCP 312 59 43 2537 5 - Extreme12719-12720 E Calaveras Blvd - 16 CIP 127 50 46 2300 5 - Extreme10012-10394 Coming Ave 1954 8 VCP 234 61 36 2196 5 - Extreme 12721-12722 E Calaveras Blvd - 15 VCP 116 59 37 2183 5 - Extreme 12721-12722* E Calaveras Blvd - 15 VCP 16 59 37 2183 5 - Extreme 12043-12021 Between Tramway & Los Pinos Ave - 30 RCP 258 56 36 2016 5 - Extreme 12716-12719 Slightly East of S Hillview Dr - 0 UNK 302 49 41 2009 5 - Extreme 12232-12251 N Milpitas Blvd - 39 RCP 434 54 36 1944 5 - Extreme 12589-12601 Cadillac Ct / Nimitz Fwy Crossing - 42 RCP 494 52 37 1924 5 - Extreme 10395-10394 Coming Ave 1954 8 VCP 15 51 36 1836 5 - Extreme 12722-12711 E Calaveras Blvd - 15 VCP 362 59 31 1829 5 - Extreme 12729-12717 E Calaveras Blvd - 15 VCP 500 59 31 1829 5 - Extreme 10176-10177 Slightly East of S Hillview Dr - 15 VCP 408 54 33 1782 5 - Extreme 12218-12522 N Milpitas Blvd - 33 RCP 201 54 33 1782 5 - Extreme 10185-10184 Slightly East of S Hillview Dr - 15 VCP 448 54 33 1782 5 - Extreme 10185-10184* Slightly East of S Hillview Dr - 15 VCP 43 54 33 1782 5 - Extreme 10883-10972 Sinclair Fwy 1965 21 VCP 495 56 31 1736 5 - Extreme10480-10481 S Abel Ave 1982 18 VCP 66 47 35 1645 5 - Extreme12488-12496 E Calaveras Blvd - 21 VCP 501 47 35 1645 5 - Extreme12457-12154 N Milpitas Blvd 1981 21 VCP 310 47 34 1598 5 - Extreme10968-12729 E Calaveras Blvd - 15 VCP 388 69 29 2001 4 - High11647-11695 Marylinn Dr 1959 27 VCP 500 74 27 1998 4 - High11781-12608 Hall Memorial Park Connection 1980 8 ABS 329 44 43 1892 4 - High 925
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
28 Table 3-4. At-Risk Pipes
11786-11781 Hall Memorial Park Connection 1980 8 ABS 144 44 43 1892 4 - High 10972-10968 E Calaveras Blvd - 15 VCP 482 64 29 1856 4 - High 12251-12219 N Milpitas Blvd - 39 RCP 319 44 42 1848 4 - High 10404-10398 S Main St - 18 VCP 407 67 26 1742 4 - High 10179-10159 Slightly East of S Hillview Dr - 15 VCP 349 44 39 1716 4 - High10178-10179 Slightly East of S Hillview Dr - 15 VCP 100 44 39 1716 4 - High11661-11656 Marylinn Dr 1959 27 RCP 133 46 36 1656 4 - High12088-12081 N Hillview Dr - 12 VCP 218 54 30 1620 4 - High12218-12219 N Milpitas Blvd - 33 RCP 25 49 33 1617 4 - High10177-10178 Slightly East of S Hillview Dr - 15 VCP 397 49 33 1617 4 - High10472-10467 Sinnot Ln - 12 VCP 219 57 28 1596 4 - High 10467-10474 S Main St - 21 VCP 326 57 28 1596 4 - High 10478-10480 S Abel Ave 1982 15 VCP 420 42 38 1596 4 - High 10472-10467* Sinnot Ln - 12 VCP 179 57 28 1596 4 - High 10333-10347 Curtis Ave 1954 18 VCP 172 51 31 1581 4 - High 12720-12721 E Calaveras Blvd - 15 VCP 60 39 40 1560 4 - High 11525-20134 Marylinn Dr 1981 27 VCP 393 47 33 1551 4 - High 12706-12733 Slightly East of S Hillview Dr - 0 UNK 118 44 35 1540 4 - High 11389-11377 Sinclair Crossing to Country Club Dr 1988 8 VCP 250 53 29 1537 4 - High 12522-12526 N Milpitas Blvd - 33 RCP 349 49 31 1519 4 - High 10462-10463 E Calaveras Blvd - 21 VCP 334 52 29 1508 4 - High 11657-11678 Marylinn Dr - 27 RCP 19 54 27 1458 4 - High 11936-11935 Sinclair Crossing to Country Club Dr 1983 12 VCP 489 54 27 1458 4 - High 12248-12233 N Milpitas Blvd - 39 RCP 370 54 27 1458 4 - High 12439-12446 N Milpitas Blvd - 24 VCP 42 47 31 1457 4 - High 12439-12446* N Milpitas Blvd - 24 VCP 42 47 31 1457 4 - High 926
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
29 Table 3-4. At-Risk Pipes
10403-10418 Machado Ave - 24 RCP 260 39 37 1443 4 - High 10403-10418* Machado Ave - 24 RCP 138 39 37 1443 4 - High 10284-10289 S Main St - 8 VCP 438 39 36 1404 4 - High 10188-10187 Slightly East of S Hillview Dr - 15 VCP 141 39 36 1404 4 - High 10331-10350 S Main St - 18 VCP 398 52 27 1404 4 - High 10284-10289* S Main St - 8 VCP 438 39 36 1404 4 - High
11678-11680 Marylinn Dr - 27 VCP 273 52 27 1404 4 - High10399-10467 S Main St - 18 VCP 451 52 26 1352 4 - High *Same facility ID, different GIS pipe segment.

Figure 3-12 provides the high and extreme risk pipelines shown in Table 3-4 in map format. 927
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
30 Figure 3-12: High Risk Pipes
928
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
31 Extreme risk pipes (21 segments) were further analyzed for drivers of high LOF and COF scores in Table 3-5. The top 3 (or 4 when tied) LOF and COF factors are noted for each pipe segment. The table is sorted alphabetically by street name Table 3-5. Extreme Risk Pipes – Drivers of High LOF and COF Scores Street Name Segment ID Install Year Pipe Diameter Pipe Material Segment Length (LF) LOF Score COF Score LOF Drivers COF Drivers Between Tramway
Dr and Los Pinos
Ave
12043-12021 - 30 RCP 258 56 36 Pipe Obstruction Rating – 25/25 Structural Rating – 10/25 Liquefaction Susceptibility – 9/10 Waterway – 15/15 Diameter – 10/10 Depth – 5/5
Cadillac Ct /
Nimitz Freeway
Crossing
12589-12601 - 42 RCP 494 52 37 Pipe Obstruction Rating – 20/25 Liquefaction Susceptibility – 15/15
Age – 6/10
Material – 6/10
Waterbodies – 12/15 Diameter – 10/10 Easement – 6/10
Coming Ave
10395-10396 1954 8 VCP 284 76 39 Required Pipe Cleaning – 25/25 Pipe Obstruction Rating – 20/25 Liquefaction Susceptibility – 12/15 Waterway - 15/15
Traffic – 9/15
Depth – 5/5
10012-10394 1954 8 VCP 234 61 36 Structural Rating – 25/25 Liquefaction Susceptibility – 12/15
Age – 10/10
Pipe Obstruction Rating – 10/25
Waterway – 12/15
Traffic – 9/15
Depth – 5/5
10395-10394 1954 8 VCP 15 51 36 Required Pipe Cleaning – 25/25 Liquefaction Susceptibility – 12/15
Age – 10/10
Waterway – 12/15
Traffic – 9/15
Depth – 5/5
E Calaveras Blvd
12717-12718 - 15 VCP 312 59 43 Structural Rating – 25/25 Pipe Obstruction Rating – 15/25 Liquefaction Susceptibility– 9/15 Traffic – 12/15
Waterway – 12/15
Diameter – 6/10
12719-12720 - 16 CIP 127 50 46 Pipe Obstruction Rating – 20/25 Material – 10/10 Liquefaction Susceptibility – 9/15
Waterway – 15/15
Traffic – 12/15
Diameter – 6/10
12721-12722 - 15 VCP 116 59 37 Structural Rating – 25/25 Pipe Obstruction Rating – 15/25 Liquefaction Susceptibility – 9/15 Traffic – 12/15
Waterway – 6/15
Diameter – 6/10
929
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
32 Table 3-5. Extreme Risk Pipes – Drivers of High LOF and COF Scores Street Name Segment ID Install Year Pipe Diameter Pipe Material Segment Length (LF) LOF Score COF Score LOF Drivers COF Drivers 12721-12722 - 15 VCP 16 59 37 Same as above. Same Segment ID Same as above.12722-12711 - 15 VCP 362 59 31 Structural Rating – 25/25 Pipe Obstruction Rating – 15/25 Liquefaction Susceptibility – 9/15 Traffic – 12/15
Diameter – 6/10 Critical Facilities – 5/5
Depth – 5/5
12729-12717 - 15 VCP 500 59 31 Structural Rating – 20/25 Pipe Obstruction Rating – 20/25 Liquefaction Susceptibility – 9/15 Traffic – 12/15
Diameter – 6/10 Critical Facilities – 5/5
Depth – 5/5
12488-12496 - 21 VCP 501 47 35 Pipe Obstruction Rating – 15/25 Liquefaction Susceptibility – 12/15 Structural Rating – 10/25 Waterway – 12/15 Diameter – 8/10 Railroad – 5/5
Depth – 5/5
N Milpitas Blvd
12232-12251 - 39 RCP 434 54 36 Pipe Obstruction Rating – 20/25 Liquefaction Susceptibility – 12/15 Structural Rating – 10/25 Diameter – 10/10 Waterway – 9/15
Traffic – 9/15
12218-12522 - 33 RCP 201 54 33 Pipe Obstruction Rating – 25/25 Liquefaction Susceptibility – 12/15
Age – 6/10
Material – 6/10
Diameter – 10/10
Traffic – 9/15
Waterway – 6/15
12457-12154 1981 21 VCP 310 47 34 Pipe Obstruction Rating – 15/25 Liquefaction Susceptibility – 12/15 Structural Rating – 10/25 Waterway – 9/15
Traffic – 9/15
Diameter – 8/10
S Abel Ave
10480-10481 1982 18 VCP 66 47 35 Pipe Obstruction Rating - 20/25 Liquefaction Susceptibility – 12/15
Age – 6/10
Waterway – 12/15
Traffic – 9/15
Diameter – 6/10
Sinclair Freeway
10883-10972 1965 21 VCP 495 56 31 Required Pipe Cleaning – 20/25 Pipe Obstruction Rating – 10/25 Liquefaction Susceptibility – 9/15 Diameter – 8/10
Traffic – 9/15
Waterway – 6/15
930
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
33 Table 3-5. Extreme Risk Pipes – Drivers of High LOF and COF Scores Street Name Segment ID Install Year Pipe Diameter Pipe Material Segment Length (LF) LOF Score COF Score LOF Drivers COF Drivers Slightly East of S
Hillview Dr
12716-12719 - 0 UNK 302 49 41 Pipe Obstruction Rating – 20/25 Structural Rating – 10/25 Liquefaction Susceptibility – 9/15 Waterway – 12/15
Traffic – 12/15
Critical Facilities – 5/5
Depth – 5/5
10176-10177 - 15 VCP 408 54 33 Pipe Obstruction Rating – 25/25 Structural Rating – 10/25 Liquefaction Susceptibility – 9/15 Waterway – 12/15 Diameter – 6/10 Railroad – 5/5
Depth – 5/5
10185-10184 - 15 VCP 448 54 33 Structural Rating – 20/25 Pipe Obstruction Rating – 15/25 Liquefaction Susceptibility - 9/15 Waterway – 12/15 Diameter – 6/10 Railroad – 5/5
Depth – 5/5
10185-10184 - 15 VCP 43 54 33 Same as above. Same Segment ID Same as above. 931
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
34 Figures 3-13 and 3-14 summarize the LOF and COF drivers previously presented in Table 3-5.

Figure 3-13: Extreme Risk Pipes – LOF Drivers
Liquefaction susceptibility, pipe obstruction rating, and structural rating are among the most common LOF drivers of extreme risk pipes. That is, of the extreme risk pipes, these LOF factors reoccur most often.

Figure 3-14: Extreme Risk Pipes – COF Drivers
Proximity to waterways, large pipe diameter, and proximity to high traffic flow areas are among the most common COF drivers of extreme risk pipes.
932
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
35 In summary, a desktop risk analysis of all pipe segments revealed that pipe mains located along E Calaveras Blvd, N Milpitas Blvd, S Main St, I-680 (crossing), Machado Ave, Sylvia Ave, Cadillac Ct, S Abel Ave, Coming Ave, Sinclair Freeway, S Hillview Drive, Sinnot Ln, and Tramway Dr were rated to be high or extreme risk. Pipe segments considered high or extreme risk are at the greatest likelihood of deterioration and/or have the highest consequence of failing. As such, pipe rehabilitation and inspection for these pipelines are prioritized in the R&R Plan (Section 4). The most common LOF drivers of high risk rating were liquefaction susceptibility, pipe obstruction rating, and structural rating. On the other hand, the most common COF drivers of high risk rating were proximity to waterways, large pipe diameter, and proximity to high traffic flow areas. Appendix F provides the risk rating for all pipes in shapefile and excel format for the City GIS department’s use. See the “Risk column” located in the last few columns.
933
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
36 Section 4: Renewal and Replacement Plan
Based on desktop condition assessment and CCTV inspection results, sewer segments were analyzed for required system improvements and recommended CCTV surveys. The Renewal and Replacement Plan involves a discussion of methodology and costs, a review of the recent projects from the current CIP to ensure recommended improvements and inspections were aligned with the current efforts, a summary of the major deficiencies present in the Main and Venus Way Lift Stations, and a summary of project recommendations.

4.1 Rehabilitation Selection Methodology
For pipe segments without inspection data, risk and diameter was evaluated for CCTV prioritization. Pipe segments with a risk rating of medium of greater (three of five or greater) were recommended to be surveyed. In addition, large diameter pipes (24-inch diameter pipe or larger) of any risk rating were recommended to be surveyed. Figure 4-1 illustrates this risk and large diameter data consideration. While the initial plan was to CCTV high and extreme risk pipes outputted from the desktop risk analysis, further evaluation revealed that the budget allowed for medium risk pipelines to be included in the CCTV recommendations. Note that the CCTV prioritization map does not distinguish inspection data availability, and as such will differ from the rehabilitation recommendation map where pipe condition data (CCTV survey) allows for more fine-tuned rehabilitation recommendations.

Figure 4-1: CCTV Prioritization Data Map
934
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
37 For pipe segments with survey data, a two-part process determined a pipe’s final rehabilitation recommendation. First, defect-level rehabilitation methods such as point repair, lining, or no action (blank) are selected for each defect in the “defect codes” module. Second, a decision tree was prepared that determines the pipe rehabilitation recommendation by analyzing the following:
• CCTV structural peak score and overall peak score
• Number of point repairs and lining recommendations (output) by the defect-level rehabilitation methods or “defect codes” module
• Number of defects
• Length of major (score of four or five) and/or minor defects (score of three) • Presence of specific defects such as ID (infiltration drippers) or SRCC (Reinforcement Corroded Chemical)

4.1.1 Defect Codes
Defect-level rehabilitation methods were selected and imported into the “Defect Codes” input window of the IAP program. Appendix H provides a full list of defect-level rehabilitation methods assigned for defects of all scores and all types. Table 4-1 presents a sample of the rehabilitation methods assigned for structural defects with a score of five.

Table 4-1. Sample Defect Codes with Associated Rehabilitation Methods Defect Code Default Score Defect Type Description Rehabilitation Method
BSV 5 Structural Broken Soil Visible Point Repair
BVV 5 Structural Broken Void Visible Point Repair
DI 5 Structural Dropped Invert Point Repair
DV 5 Structural Deformed Vertical Brick Point Repair
HSV 5 Structural Hole Soil Visible Point Repair
HVV 5 Structural Hole Void Visible Point Repair
SMW 5 Structural Missing Wall Point Repair
SMWC 5 Structural Missing Wall Chemical Point Repair
SMWM 5 Structural Missing Wall Mechanical Point Repair
SMWZ 5 Structural Missing Wall Unknown Point Repair
SRC 5 Structural Reinforcement Corroded Point Repair
SRCC 5 Structural Reinforcement Corroded Chemical Point Repair SRCM 5 Structural Reinforcement Corroded Mechanical Point Repair SRCZ 5 Structural Reinforcement Corroded Unknown Point Repair SRP 5 Structural Reinforcement Projecting Lining
SRVM 5 Structural Reinforcement Visible Mechanical Lining SRVZ 5 Structural Reinforcement Visible Unknown Lining
XB 5 Structural Collapse Brick Sewer Point Repair
XP 5 Structural Collapse Pipe Sewer Point Repair
935
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
38 4.1.2 Rehabilitation Decision Tree
Figure 4-2 illustrates the rehabilitation selection process. First, survey data availability is checked in the “[Has CCTV Data]” condition box. Pipes without survey data are then evaluated for risk and large diameter pipes. Pipes with survey data are then screened for inspection score. As the decision tree progresses, each pipe is analyzed for its number of point repairs and lining recommendations outputted by the “defect codes” module, number of defects, length of defects, and presence of specific minor but not negligible defects.

When multiple rehabilitation options are present, a cost comparison is done to determine the best action.

This is to ensure that a pipe would not be recommended to have 10 sectional liners when a full liner would be more cost efficient. In another example, when multiple point repair(s) by excavation or sectional liner(s) are present, the cost to replace or cost to perform a “full liner + point repair(s) by excavation” is compared to ensure the best action is recommended.

936
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
39 Figure 4-2: Rehabilitation Decision Tree
937
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
40 4.1.3 Analysis Quality Check
For each decision tree branch, spot checks were performed to see if the rehabilitation recommendations matched engineering expectations. For example, Figure 4-3 illustrates a pipe which was recommended to be replaced. Using the IAP program, defects present in the pipe and suggested rehab methods were reviewed and validated. At least 20 percent of each decision tree branch was reviewed for each rehabilitation type except pipes with “No Action” which have received a risk score of one (negligible) or two (low).

Figure 4-3: Example Analysis Quality Check in IAP

4.1.4 Staff Input
Prior to draft report submission, a preliminary rehabilitation decision tree was sent to the City in July 2020 in the event that preliminary staff input was desired. At the time, review was deferred until after draft report submission. Thus, recommendations are currently based on prior condition assessment projects and 938
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
41 engineering experience. Defect-level rehabilitation methods and decision tree can be adjusted to best suit City operational preferences.

4.2 Basis of Cost Assumptions
Detailed unit costs for the rehabilitation items used in the Class 5 cost estimate can be found in Appendix J.

The cost per foot is specified by pipe size. Unit costs are provided for the following:
• CCTV
• Pipe Replacement
• Point Repair(s) by Excavation
• Sectional Liner(s)
• Full Pipe Length Cured in Place Pipe (Full CIPP)
In general, material costs were provided by vendor quotations and labor costs were estimated using RSMeans construction cost database. For pipes with unknown diameters, the average pipe diameter of nine inches was used for costing. For pipes with unknown depths, the average pipe depth of 11 feet was assumed. The unit costs used to develop rehabilitation recommendations are budgetary construction costs and do not include engineering, permitting, legal, administrative, or other planning costs typical of budgetary capital improvement planning. City input for CIP planning level costs either in the form of percentage breakdown or recent bid tabulations would further calibrate the model to ensure the best recommendations are made.

4.3 Review of Recent Projects
As a part of this renewal and replacement study, a review of recent City projects was performed to ensure our recommendations are aligned with recent and planned projects.

Table 4-2 presents recent or ongoing sewer utility and lift station improvement projects from the City’s 2019- 24 CIP.

Table 4-2. Recent Sewer Utility Improvement Projects
Project ID Project Description Status
6119 Sanitary Sewer Condition
Assessment Program Citywide CCTV
Ongoing. Summary of recommendations for CCTV are
described in Section 4.5. For a full list of CCTV recommendations, see Appendix A 6123 Sanitary Sewer Overflow
Improvements Smart manholes Ongoing
6124 Sewer Pump Station
Rehabilitation Program
In Fiscal Year (FY)2018-19 and FY2019-20
Pump 3 replacement at Main Lift Station and
assessment of Pumps 4 and 5
Per 2020 Lift Station Inspections (Task 2 submittal to
HSE and briefly described in next section):
• Pump 3 is in poor condition and requires replacement • Pumps 4 and 5 are in good condition
6126 Minor Sewer Projects In FY 2018-19, replace Pump 2 at Main Lift Station and one pump at Venus Station To be determined
939
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
42 Table 4-2. Recent Sewer Utility Improvement Projects Project ID Project Description Status
6131 Sanitary Sewer Cathodic
Protection Improvements
Two magnetic flow meters at the Main Sewer
Pump Station will to be replaced and isolated
from cathodic protection to prevent reading
interference. Design to start in FY2019-20
To be determined
6132 Sewer Master Plan 2019
This update will identify deficiencies in the
collection system and recommend corrective
actions. Funding is added to FY2019-20 to
include assessment of City’s main sewer pipes.

Ongoing. Summary of deficiencies and recommendations
are reflected in this report.

Not
Provided
Sewer Line Replacement at
E. Curtis
This line is at full capacity and requires
replacement/upgrades. To be determined

4.4 Lift Station Rehabilitation
In early 2020, an inspection of the Main Lift Station and Venus Way Lift Station was completed, and deficiencies were catalogued. Table 4-3 summarizes the major lift station deficiencies that require attention.

The Main and Venus Way Lift Station Inspections Report submitted to City in May 2020 (Appendix K) provides a more comprehensive scoring and inspection notes for lift station assets.

Table 4-3. Main Lift Station Deficiencies
Asset Name Field Assessment/Comments Condition Score Performance Score Mag Meter (Flow
Meter A) Not in Operation
4 - Poor Condition
Major defects observed, asset integrity
may be compromised.
4 - Poor Performance
In service, but function is highly
impaired.

Manifold PV #2
Actuator Does not work
5 - Failing or Failed
Asset integrity is compromised, asset may
be out of service.
5 - Failing or Failed
Asset is not functioning as intended
or is out of service.

Pump #3 Has exceeded useful life
4 - Poor Condition
Major defects observed, asset integrity
may be compromised.
4 - Poor Performance
In service, but function is highly
impaired.

Grinder #1 Excessive vibration and inadequate
supports
5 - Failing or Failed
Asset integrity is compromised, asset may
be out of service.
5 - Failing or Failed
Asset is not functioning as intended
or is out of service.
2’’ Combination
Air/Vacuum Valve N/A
4 - Poor Condition
Major defects observed, asset integrity
may be compromised.
4 - Poor Performance
In service, but function is highly
impaired.

Flow Meter B Operable, but no accurate
4 - Poor Condition
Major defects observed, asset integrity
may be compromised.
4 - Poor Performance
In service, but function is highly
impaired.

Air Vacuum 1 to 15 Cavitation, coating failure, and inadequate supports
5 - Failing or Failed
Asset integrity is compromised, asset may
be out of service.
5 - Failing or Failed
Asset is not functioning as intended
or is out of service.

Variable Frequency No corrosion identified, arc flash labels 4 - Poor Condition 2 - In service 940
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
43 Table 4-3. Main Lift Station Deficiencies
Asset Name Field Assessment/Comments Condition Score Performance Score Drive P2 missing Asset integrity may be moderately
compromised.

Higher than expected O&M.

Variable Frequency
Drive P3
No corrosion identified, understood from
City that IGBT was replaced a year ago, arc
flash labels missing
4 - Poor Condition
Asset integrity may be moderately
compromised.
2 - In service
Higher than expected O&M.

Variable Frequency
Drive P4
No corrosion identified, arc flash labels
missing
4 - Poor Condition
Asset integrity may be moderately
compromised.
2 - In service
Higher than expected O&M.

Variable Frequency
Drive P5
No corrosion identified, understood from
City that cooling fans were replaced a year
ago, arc flash labels missing
4 - Poor Condition
Asset integrity may be moderately
compromised.
2 - In service
Higher than expected O&M.

4.5 Summary of Recommendations
Recommendations of system improvements and CCTV inspections total $17.4 million in construction costs.

Asset renewal and replacement priorities were assessed based on inspection data, desktop risk evaluation, and rehabilitation selection methodology described in previous sections. The results are presented below.

4.5.1 Sewer Main Pipelines
Of the approximately 105,000 LF (449 segments) of sewer inspected, about 50,000 LF (178 segments) require improvement. The construction cost of system improvements is estimated at approximately $17 million. Of the remaining 685,000 LF segments with no inspection data, it is recommended that 55,000 LF of medium to extreme risk pipes and/or large diameter pipes receive CCTV inspection, with an estimated cost totaling approximately $400,000. Recommendations of system improvements and CCTV inspections total $17.4 million in construction costs. Large diameter pipe is currently defined as 24-inch diameter and can be adjusted. Recommended improvements include:
• Additional CCTV
• Pipe Replacement
• Full Cured-In-Place Pipe (CIPP)
• Full CIPP + Point Repair(s) by Excavation
• Point Repair(s) by Excavation
• Sectional Liner(s)
• Sectional Liner(s) + Point Repair(s) by Excavation
Figure 4-4 provides the sewer main pipeline rehabilitation recommendations. The capital improvement program (CIP) recommendations for each asset is also included in GIS and tabular format in Appendix A.

Note that these recommendations are subject to change depending on future discussions with operational staff prefers to determine rehabilitation preferences of the various levels and types of defects. The Class 5 cost estimates are high level (1-2% planning level) and will be refined as project scopes are further defined.

Detailed cost estimates are recommended when further CIP budgeting and planning takes place. 941
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
44 Figure 4-4: Preliminary Pipe Rehabilitation Recommendations Map 942
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
45 4.5.2 CCTV Inspection
Medium to extreme risk pipes and large diameter pipes are recommended for CCTV inspection. Large diameter pipe is currently defined as 24-inch diameter and can be adjusted. Figure 4-5 presents the CCTV inspection map of these highest priority areas. As shown on the figure, CCTV inspections include the long west-side pipeline stretch starting from Barber Lane through N McCarthy Boulevard and throughout the City.

These inspections total 55,000 LF, with an estimated cost totaling approximately $400,000.

943
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
46 Figure 4-5: Priority CCTV Areas
944
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
47 4.5.3 Preliminary Capital Improvement Plan Alternatives Summary BC has developed three distinct Capital Improvement Plan (CIP) alternatives to phase out the necessary rehabilitation efforts. Alternative A presents CIP grouping based on risk grades. Alternative B focuses rehabilitation geographically within the sewer basin. Alternative C is a hybrid approach wherein pipes with risk and significant defects are prioritized in the first year and after which a geographic approach is applied for ease of construction. With the given data, Alternative C is recommended among the three alternatives explored here.

However, note that the CIP grouping presented in Alternatives A, B, and C serve as preliminary groupings of sewer pipe rehabilitations. The alternatives presented at this stage are not exhaustive of other possibilities and modifications. Within Appendix A, you will find a “Preliminary Rehab Recommendation.shp” shapefile and excel export results to help facilitate further development of the CIP. The shapefile attribute table contains column “CIP_Phase” which match up with the 4 phases in Alternative A and B. The table also includes column “CIP_ST” which allows sorting of pipes along the same street to facilitate the development of visuals or further analysis of risk and rehabilitation data for CIP development. 945
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
48 4.5.4 Preliminary Sewer Pipeline Capital Improvement Plan – Alternative A Alternative A presents CIP grouping based on risk grades. Table 4-4 provides an overview of Alternative A.

Note that the same street may have GIS segments of various risk grades and may thus be split in this alternative.

Table 4-4. Preliminary Sewer Pipeline Capital Improvement Plan - Alternative A Summary Year Description Construction Cost1
Construction
Cost Per Year
1 Rehabilitate Extreme Risk Assets $1,700,000 -
CCTV Large Diameter and Medium to Extreme Risk
Assets $400,000 -
2 Rehabilitate High Risk Assets $2,600,000 -
3-7 Rehabilitate Medium Risk Assets $10,900,000 $2,200,000 8 Rehabilitate Low Risk Assets $1,800,000 -
Total Cost $17,400,000 $2,175,000
1Contingencies amounting to 45% are included in the cost estimate (5% Mobilization/Demobilization, 10% Sewer Bypassing, 30% Construction Cost and Market Contingency). Additionally, traffic control during construction amounting to $10,000 to $30,000 depending on roadway traffic rating was also assumed. Administrative, engineering, or other planning costs typical of CIP planning are not included.

946
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
49 Year 1
The first year includes rehabilitating extreme risk assets (grade 5 out of 5) and CCTV inspection of the most critical assets as described in Section 4.5.2 involving the long west-side pipeline stretch starting from Barber Lane through N McCarthy Boulevard and throughout City. Table 4-5 presents the pipe rehabilitation details for year 1.

Table 4-5. Alternative A CIP – Year 1, Extreme Risk Pipes Street Name Size
(inch) Material Construction Cost Facility ID(s) Notes
Between
Tramway Dr
and Los
Pinos Ave
30 RCP $200,000 12043-12021
Full CIPP
250 ft
Coming Ave 8 VCP $70,000
10395-10396
10012-10394
Full CIPP
500 ft
E Calaveras
Blvd 15, 21 VCP $400,000
12717-12718
12721-12722
12722-12711
12488-12496
12729-12717
12721-12722
Full CIPP, Point Repair(s), Sectional Liner(s)
1,800 ft
Just East of S
Hillview Dr 15 VCP $300,000
10176-10177
12716-12719
10185-10184
10185-10184
Full CIPP, Sectional Liner(s)
1,200 ft
N Milpitas
Blvd 33, 39 RCP $600,000
12232-12251
12218-12522
Full CIPP, Point Repair(s)
600 ft
Nimitz
Freeway and
California Cir
42 RCP) $34,000 12589-12601 Sectional Liner(s)
500 ft
S Abel St 18 VCP $42,000 10480-10481 Point Repair(s), Sectional Liner(s). 65 feet, 1 pipe segment
947
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
50 Year 2
The second year consists of various rehabilitation of high risk (grade 4 out of 5) assets.

Table 4-6. Alternative A CIP – Year 2, High Risk Pipes
Street Name Size
(inch) Material Construction Cost Facility ID (s) Notes Between Tramway Dr
and Los Pinos Ave 24 VCP $100,000
12439-12446
12439-12446
Full CIPP
85 ft
Curtis Ave 18 VCP $50,000 10333-10347
Sectional Liner(s)
170 ft
E Calaveras Blvd* 21 VCP $70,000 10462-10463 Sectional Liner(s) 330 ft
Just East of S Hillview
Dr* 15 VCP $335,000
12706-12733
10188-10187
10179-10159
10177-10178
10178-10179
Full CIPP, Point Repair(s), Sectional Liner(s)
1,100 ft
Machado Ave 24 RCP $280,000
10403-10418
10403-10418
Full CIPP
400 ft
Marylinn Dr 27 VCP $500,000 11647-11695
11678-11680
Pipe Replacement, Point Repair(s), Sectional Liner(s)
770 ft
N Hillview Dr 12 VCP $40,000 12088-12081
Sectional Liner(s)
220 ft
N Milpitas Blvd* 33, 39 RCP $800,000
12218-12219
12522-12526
12251-12219
12248-12233
Full CIPP, Point Repair(s), Sectional Liner(s)
1,060 ft
S Main St 18, 21 VCP $250,000
10331-10350
10404-10398
10399-10467
10467-10474
Point Repair(s) and Sectional Liner(s)
1,600 ft
Sinnot Ln 12 VCP $180,000
10472-10467
10472-10467
Full CIPP
400 ft
Note:
*: This street also has a GIS segment requiring rehabilitation in Year 1. 948
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
51 Years 3-7
Years 3-7 feature rehabilitation of medium risk assets (grade 3 out of 5) as described in Table 4-7.

Table 4-7. Alternative A CIP – Years 3-7, Medium Risk Pipes Street Name Rehabilitation Action
Ames Ave Sectional Liner(s)
Between Tramway and Los Pinos Ave* Full CIPP, Sectional Liner(s) Coming Ave* Point Repair(s), Sectional Liner(s)
Connection between N Milpitas Blvd and Summerwind Way**** Full CIPP, Sectional Liner(s) Connection to Southwest Community
Starting from W Calaveras Blvd**** Full CIPP, Point Repair(s), Sectional Liner(s) Curtis Ave** Full CIPP, Pipe Replacement, Point Repair(s), Sectional Liner(s) E Calaveras Blvd* Point Repair(s), Sectional Liner(s)
Gibraitar Dr Point Repair(s), Sectional Liner(s)
Great Mall Dr Full CIPP, Sectional Liner(s)
Just east of S Hillview Dr* Point Repair(s), Sectional Liner(s) Kennedy Dr Full CIPP
Machado Ave** Sectional Liner(s), Full CIPP
Marylinn Dr** Full CIPP, Pipe Replacement, Point Repair(s), Sectional Liner(s) N Abel St Sectional Liner(s)
N Hillview Dr** Sectional Liner(s)
N McCarthy Blvd Sectional Liner(s)
N Milpitas Blvd* Full CIPP, Sectional Liner(s)
Nimitz Freeway and California Cir* 2 Crossings near - Sectional Liner(s), Full CIPP River Rock Rd Full CIPP
S Abbot Ave Sectional Liner(s)
S Main St** Point Repair(s), Sectional Liner(s)
S Milpitas Blvd Point Repair(s), Sectional Liner(s)
Sinclair Freeway Crossing near Fox Hollow Ct Sectional Liner(s) Smithwood St Sectional Liner(s)
Wool Dr Full CIPP
Yosemite Dr Full CIPP, Point Repair(s), Sectional Liner(s) Notes:
*: the street also has repairs in year 1.
**: the street also has repairs in year 2.
****: the street also has repairs in year 8.
949
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
52 Year 8
Year 8 of Alternative A includes rehabilitation of low risk assets (grade 1 or 2) as described in Table 4-8. The 2020 CCTV inspections included several lower risk assets which identified defects requiring rehabilitation.

Table 4-8. Alternative A CIP – Year 8, Low Risk Pipes
Street Name Rehabilitation Action
Between Tramway and Los Pinos Dr* Full CIPP
Coming Ave* Sectional Liner(s)
Connection to SW Community
Starting from W Calaveras Blvd*** Sectional Liner(s)
Great Mall Dr*** Point Repair(s)
Machado Ave** Full CIPP
N Hillview Dr** Sectional Liner(s)
Silverlake Dr Full CIPP and Point Repair
Sinclair Freeway Full CIPP
Turquoise St Point Repair
Tramway Dr Sectional Liner(s)
Meadowland Dr Pipe Replacement and Point Repair(s)
Notes:
*: the street also has repairs in year 1.
**: the street also has repairs in year 2.
***: the street also has repairs in years 3-7.
950
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
53 4.5.5 Preliminary Sewer Pipeline Capital Improvement Plan – Alternative B Alternative B presents CIP grouping based on risk while grouping pipes on the same street that have a rehabilitation action associated with it. Table 4-9 provides an overview of Alternative B.

Table 4-9. Preliminary Sewer Pipeline Capital Improvement Plan - Alternative B Summary Year Description Construction Cost1 Construction Cost
Per Year
1-4
Rehabilitate Extreme Risk Pipes and Other Pipes Along the Same Street With Rehabilitation Needs $7,800,000
$2,050,000
CCTV Large Diameter and Medium to Extreme Risk Pipes $400,000 5-6 Rehabilitate High Risk Pipes and Pipes Along the Same Street $5,400,000 $2,700,000 7-8 Rehabilitate Medium Risk Pipes and Pipes Along the Same Street $2,800,000 - 8 Rehabilitate Low Risk Streets $1,000,000 -
Total Cost $17,400,000 $2,175,000
1Contingencies amounting to 45% are included in the cost estimate (5% Mobilization/Demobilization, 10% Sewer Bypassing, 30% Construction Cost and Market Contingency). Additionally, traffic control during construction amounting to $10,000 to $30,000 depending on roadway traffic rating was also assumed. Administrative, engineering, or other planning costs typical of CIP planning are not included.

951
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
54 Years 1-4
Years 1-4 include rehabilitating extreme risk pipes and pipes with rehabilitation needs (of any risk grading) along the same street and CCTV inspection of the most critical assets as described in Section 4.5.2 involving the long west-side pipeline stretch starting from Barber Lane through N McCarthy Boulevard and throughout City. Table 4-10 provides the list of pipes requiring rehabilitation in more detail.

Table 4-10. Alternative B CIP – Years 1-4, Streets With Extreme Risk Segments Risk
Grade
Average
Street Name Size (inch) Material
Total
Construction
Cost of Street
Cost of Rehabilitating
Grade 4 or 5 GIS
Segments Only
Notes

5.0 S Abel St 18 VCP $42,000 -
Point Repair(s), Sectional Liner(s).
65 feet, 1 pipe segment

4.1 Just East of S Hillview
Dr 12, 15 VCP $720,000 $615,000
Full CIPP, Point Repair(s), Sectional
Liner(s)
2,300/3,450 ft of high/extreme risk
pipe

3.9 E Calaveras Blvd 12, 15, 18, 21 VCP $727,000 $450,000 Full CIPP, Point Repair(s), Sectional
Liner(s)
2,150/4,650 ft of high/extreme risk
pipe

3.7 N Milpitas Blvd 33, 39 RCP $2,300,000 $1,400,000
Full CIPP, Sectional Liner(s)
1,700/3,050 ft of high/extreme risk
pipe

3.5 Coming Ave 8 VCP $220,000 $70,000
Full CIPP
500/1,600 ft of extreme risk pipe

3.5 Nimitz Freeway and
California Cir 18, 42 VCP, RCP (respectively) $615,000 $34,000 Full CIPP, Sectional Liner(s)
500/2000 ft of extreme risk pipe

2.8 Between Tramway Dr
and Los Pinos Ave 24, 30 VCP, RCP $3,200,000 $300,000
Full CIPP, Sectional Liner(s)
350/4,500 ft of high/extreme risk pipe

952
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
55 Years 5-6
The 5th and 6th year consist of various rehabilitation of high risk (grade 4 out of 5) pipes and pipes along the same street which require rehabilitation of any risk rating. Table 4-11 presents the list of pipes Table 4-11. Alternative B CIP – Years 5-6, Streets with High Risk Segments Risk
Grade
Average
Street Name Size
(inch) Material Total Construction Cost of Street
Cost of Rehabilitating
Grade 4 Pipes Only Notes

4.0 Sinnot Ln 12 VCP $180,000 - Full CIPP
400 feet, 2 pipes

3.44 S Main St 18, 21 VCP $650,000 $250,000
Point Repair(s) and Sectional Liner(s)
1,600/3,600 ft of high risk pipes

3.17 Marylinn Dr 27, 30 RCP, VCP $2,300,000 $500,000
Full CIPP, Pipe Replacement, Point
Repair(s), Sectional Liner(s)
750/3,100 ft of high risk pipes

3.08 Curtis Ave 15, 18 VCP $800,000 $50,000
Full CIPP, Pipe Replacement, Point
Repair(s), Sectional Liner(s),
200/1,600 ft of high risk pipes

2.92 Machado Ave 24, 30 RCP, VCP $1,300,000 $280,000 Full CIPP, Sectional Liner(s) 400/2,150 ft of high risk pipes

2.6 N Hillview Dr 12 DIP, CIP $170,000 $40,000
Sectional Liner(s)
200/1,050 ft of high risk pipes
953
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
56 Years 7-8, Medium Risk Pipes
Years 7-8 include rehabilitating medium risk pipes as detailed in Table 4-12 Table 4-12. Alternative B CIP – Years 7-8, Medium Risk Pipes Street Name Rehabilitation Action
Ames Ave Sectional Liner(s)
Connection to Southwest Community
Starting from W Calaveras Blvd Full CIPP, Point Repair(s), Sectional Liner(s) Connection Between N Milpitas Blvd and Summerwind Way Full CIPP, Sectional Liner(s) Gibraitar Dr Point Repair(s), Sectional Liner(s)
Great Mall Dr Full CIPP, Sectional Liner(s)
Kennedy Dr Full CIPP
N Abel St Sectional Liner(s)
N McCarthy Blvd Sectional Liner(s)
River Rock Rd Full CIPP
S Abbot Ave Sectional Liner(s)
S Milpitas Blvd Point Repair(s), Sectional Liner(s)
Sinclair Freeway Crossing near Fox Hollow Ct Sectional Liner(s) Smithwood St Sectional Liner(s)
Wool Dr Full CIPP
Yosemite Dr Full CIPP, Point Repair(s), Sectional Liner(s) Year 8, Low Risk Pipes
Year 8 also includes rehabilitating low risk pipes as detailed in Table 4-13.

Table 4-13. Alternative B CIP – Year 8, Low Risk Pipes
Street Name Rehabilitation Action
Silverlake Dr Full CIPP and Point Repair
Sinclair Freeway Full CIPP
Turquoise St Point Repair
Tramway Dr Sectional Liner(s)
Meadowland Dr Pipe Replacement and Point Repair(s)

954
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
57 4.5.6 Preliminary Sewer Pipeline Capital Improvement Plan – Alternative C (Recommended) Alternative C presents a hybrid approach of Alternative A and B. The most pressing defects within the high and extreme risk pipe subset are addressed in the first year to reduce the likelihood of catastrophic failures.

Following this, street by street rehabilitation (sorted by risk) similar to Alternative B is recommended for ease of construction.

Table 4-14. Preliminary Sewer Pipeline Capital Improvement Plan - Alternative C Summary Year Description Construction Cost1 Construction Cost
Per Year
1 Rehabilitate Extreme and High Risk Pipes with Significant Defects $1,300,000 $3,000,000 CCTV Large Diameter and Medium to Extreme Risk Pipes $400,000 1-3 Rehabilitate Extreme Risk Pipes and Pipes Along the Same Street Requiring Rehabilitation $7,400,000
4 Rehabilitate High Risk Pipes and Pipes Along the Same Street $1,900,000 - 5-7 Rehabilitate Medium Risk Pipes and Pipes Along the Same Street $5,400,000 $1,800,000 8 Rehabilitate Low Risk Streets $1,000,000 -
Total Cost $17,400,000 $2,175,000
1Contingencies amounting to 45% are included in the cost estimate (5% Mobilization/Demobilization, 10% Sewer Bypassing, 30% Construction Cost and Market Contingency). Additionally, traffic control during construction amounting to $10,000 to $30,000 depending on roadway traffic rating was also assumed. Administrative, engineering, or other planning costs typical of CIP planning are not included.

955
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
58 Year 1
In year 1, extreme and high risk pipes with significant defects are addressed. Table 4-15 provides the list of extreme risk pipes with significant defects. Additionally, CCTV inspection of the most critical assets involving the long west-side pipeline stretch starting from Barber Lane through N McCarthy Boulevard and throughout City as depicted in Figure 4-4 is recommended (Section 4.5.2).

Table 4-15. Alternative C CIP – Year 1, Extreme Risk Pipes With Significant Defects Street Name Size Material Significant Defects
Observed Rehab Recommendation Construction Cost Facility ID Coming Ave 8 VCP
Broken Soil Visible
Surface Corrosion Metal
Pipe
Sectional Liner(s), Point Repair(s) $40,000 10012-10394 E Calaveras Blvd 15 VCP Broken Sectional Liner(s), Point Repair(s) $85,000 12717-12718 E Calaveras Blvd 15 VCP Broken Full CIPP $75,000 12721-12722 E Calaveras Blvd 15 VCP
Hole Soil Visible
Broken (3)
Broken Soil Visible Full CIPP
$40,000
12721-12722
E Calaveras Blvd 15 VCP Broken (3) Sectional Liner(s), Point Repair(s) $70,000 12722-12711 E Calaveras Blvd 15 VCP Broken (3) Sectional Liner(s), Point Repair(s) $80,000 12729-12717 Just East of S
Hillview Dr 15 VCP Broken (2) Sectional Liner(s) $35,000 10185-10184 Just East of S
Hillview Dr 15 VCP Broken Full CIPP $30,000 10185-10184 Total Construction Cost $500,000
Table 4-16 provides the list of high risk pipes with significant defects.

Table 4-16. Alternative C CIP – Year 1, High Risk Pipes With Significant Defects Street Name Size Material Significant Defects
Observed Rehab Recommendation Construction Cost Facility ID Curtis Ave 18 VCP Broken Sectional Liner(s) $50,000 10333-10347 Marylinn Dr 27 VCP Broken (3) Pipe Replacement $390,000 11678-11680 Marylinn Dr 27 RCP Broken (2) Full CIPP, Point Repair(s) $30,000 11657-11678 N Hillview Dr 12 VCP Obstruction Intruding
Through Wall
Sectional Liner(s) $40,000 12088-12081
S Main St 18 VCP Broken (2) Sectional Liner(s) $50,000 10404-10398 S Main St 21 VCP Broken (2) Point Repair(s) $35,000 10467-10474 Sinnot Ln 12 VCP Surface Damage
Reinforcement Visible
Full CIPP, Point Repair(s) $95,000 10472-10467
Sinnot Ln 12 VCP Surface Damage
Reinforcement Projecting
Full CIPP, Point Repair(s) $85,000 10472-10467
Total Construction Cost $800,000
956
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
59 Years 1-3
In years 1-3, extreme risk pipes and pipes with rehabilitation needs (of any risk grading) along the same street which were not addressed in year 1 are recommended at this stage. Table 4-17 provides the list of pipes requiring rehabilitation in more detail.

Table 4-17. Alternative C CIP – Years 1-3, Streets with Extreme Risk Segments Risk
Grade
Average
Street Name Size (inch) Material
Total
Construction
Cost of Street
Cost of Rehabilitating
Grade 4 or 5 GIS
Segments Only
Notes

5.0 S Abel St 18 VCP $42,000 -
Point Repair(s), Sectional Liner(s).
65 feet, 1 pipe segment

3.9 Just East of S Hillview
Dr* 12, 15 VCP $655,000 $550,000
Full CIPP, Point Repair(s), Sectional
Liner(s)
2,300/3,450 ft of high/extreme risk
pipe

3.7 N Milpitas Blvd 33, 39 RCP $2,300,000 $1,400,000
Full CIPP, Sectional Liner(s)
1,700/3,050 ft of high/extreme risk
pipe

3.5 Nimitz Freeway and
California Cir 18, 42 VCP, RCP (respectively) $615,000 $34,000 Full CIPP, Sectional Liner(s)
500/2000 ft of extreme risk pipe

3.3 E Calaveras Blvd* 12, 15, 18, 21 VCP $370,000 $95,000 Full CIPP, Point Repair(s), Sectional
Liner(s)
2,150/4,650 ft of high/extreme risk
pipe

3.2 Coming Ave* 8 VCP $180,000 $30,000
Full CIPP
500/1,600 ft of extreme risk pipe

2.8 Between Tramway Dr
and Los Pinos Ave 24, 30 VCP, RCP $3,200,000 $300,000
Full CIPP, Sectional Liner(s)
350/4,500 ft of high/extreme risk pipe
Total Construction Cost $7,400,000
Note:
*: This street had some rehabilitation done in year 1.

957
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
60 Year 4
The 4th year consist of various rehabilitation of high risk (grade 4 out of 5) pipes and other pipes requiring rehabilitation along the same street. Table 4-18 presents the list of pipes.

Table 4-18. Alternative C CIP – Year 4, Streets with High Risk Segments Risk
Grade
Average
Street Name Size
(inch) Material Total Construction Cost of Street
Cost of Rehabilitating
Grade 4 Pipes Only Notes

3.3 S Main St* 18, 21 VCP $570,000 $170,000 Point Repair(s) and Sectional Liner(s) 1,600/3,600 ft of high risk pipes

2.9 Machado Ave 24, 30 RCP, VCP $1,300,000 $280,000
Full CIPP, Sectional Liner(s)
400/2,150 ft of high risk pipes
Total Construction Cost $1,900,000
Note:
*: This street had some rehabilitation done in year 1.
958
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
61 Years 5-7, Medium Risk Pipes
Years 5-7 include rehabilitating medium risk pipes as detailed in Table 4-19.

Table 4-19. Alternative C CIP – Years 5-7, Medium Risk Pipes Street Name Rehabilitation Action
Ames Ave Sectional Liner(s)
Connection to Southwest Community
Starting from W Calaveras Blvd Full CIPP, Point Repair(s), Sectional Liner(s) Connection Between N Milpitas Blvd and Summerwind Way Full CIPP, Sectional Liner(s) Curtis Ave Full CIPP, Pipe Replacement, Point Repair(s), Sectional Liner(s) Gibraitar Dr Point Repair(s), Sectional Liner(s)
Great Mall Dr Full CIPP, Sectional Liner(s)
Kennedy Dr Full CIPP
Marylinn Dr Full CIPP, Pipe Replacement, Point Repair(s), Sectional Liner(s) N Abel St Sectional Liner(s)
N Hillview Dr Full CIPP, Sectional Liner(s)
N McCarthy Blvd Sectional Liner(s)
River Rock Rd Full CIPP
S Abbot Ave Sectional Liner(s)
S Milpitas Blvd Point Repair(s), Sectional Liner(s)
Sinclair Freeway Crossing near Fox Hollow Ct Sectional Liner(s) Smithwood St Sectional Liner(s)
Wool Dr Full CIPP
Yosemite Dr Full CIPP, Point Repair(s), Sectional Liner(s) Year 8, Low Risk Pipes
Year 8 also includes rehabilitating low risk pipes as detailed in Table 4-20.

Table 4-20. Alternative C CIP – Year 8, Low Risk Pipes
Street Name Rehabilitation Action
Silverlake Dr Full CIPP and Point Repair
Sinclair Freeway Full CIPP
Turquoise St Point Repair
Tramway Dr Sectional Liner(s)
Meadowland Dr Pipe Replacement and Point Repair(s)
959
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
62 4.5.7 Sewer Lift Station Rehabilitation
The Main Lift Station and Venus Way Lift Station were inspected, and major deficiencies were catalogued (refer to Table 4-3). The variable frequency drives (VFDs), pump #3, and grinder are the main items requiring rehabilitation. The detailed score for each inventory item is provided in Appendix K, Main and Venus Way Lift Station Inspections Report. Per City’s 2019-24 CIP, project 6124, an allowance of $100,000 annual investment from FY 2019-20 through 2022-23 is planned to address these rehabilitation needs.

4.5.8 Estimated Construction Cost
The Association for the Advancement of Cost Engineering (AACE) Class 5 Estimate is a rough order-ofmagnitude estimate typically used to evaluate alternatives and is the class of estimate used in this report.

Standard unit prices were developed for the primary components in each proposed construction contract.

Scope items were parametrically estimated using cost data from similar projects in scope and size and adjusted to suit the specific requirements of this project. The estimated construction costs presented are considered conceptual and include a 45 percent contingency factor. Additionally, the presented costs are budgetary construction costs and do not include engineering, permitting, legal, administrative, or other planning costs typical of budgetary capital improvement planning. 960
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
63 References
City of San Jose Environmental Services Department, “Tributary Agencies,” City of San Jose Government, June 2015, https://www.sanjoseca.gov/home/showdocument?id=32063.

County of Santa Clara Department of Planning and Development, “Geological Maps and Data”, County of Santa Clara Government, https://www.sccgov.org/sites/dpd/OrdinancesCodes/GeoHazards/Pages/GeoMaps.aspx Municipal and Financial Services Group, “City of Milpitas Sewer Rate Study Draft Report,” City of Milpitas Government, November 2018, http://www.ci.milpitas.ca.gov/wp-content/uploads/2019/01/Sewer-Rate-Study-2018.pdf. “Milpitas Wastewater Fact Sheet,” Critical Information You Need to Know About the State of Milpitas’ Sewer System, http://www.ci.milpitas.ca.gov/wp-content/uploads/2018/12/MilpitasWastewaterFactSheet.pdf.

Rex L. Baum et al., “Landslide and Land Subsidence Hazards to Pipeline”, USGS Publications Warehouse, 2008, https://pubs.usgs.gov/of/2008/1164/pdf/OF08-1164_508.pdf “USGS National Hydrography Dataset”, The National Map – Data Delivery, 2019, https://www.usgs.gov/core-sciencesystems/ngp/tnm-delivery/ “USGS National Transportation Dataset for California 20170822”, Data Catalog, 2017, https://catalog.data.gov/dataset/usgs-national-transportation-dataset-ntd-for-california-20140908-state-or-territoryshapefile “Water and Sewer System Information,” City of Milpitas Government, http://www.ci.milpitas.ca.gov/milpitas/departments/public-works-department-homepage/watersewer2018/#1546465747578-cb3b6f17-70cd.

961
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
Appendix A: Rehabilitation Table, GIS, and Figures
962
Item # 16.

This Appendix is a file export from Microsoft Excel.
963
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
Appendix B: Planned CCTV Inspection Scope
964
Item # 16.

P:\154000\154251-Milpitas Water - Sewer Master Plan\03_Condition Assessment\Inspection\Milpitas CCTV scope.docx P a g e | 1 City of Milpitas
CCTV Inspection Scope
November 14, 2019
Scope of Work
HydroScience Engineers (HSE) plans to contract with National Plant (Contractor) to inspect portions of the City of Milpitas’ large-diameter trunk sewers and other local collector sewers with highdefinition CCTV equipment. For large-diameter trunk sewers in the Trunk A grouping below, provide an option to collect 2D laser and sonar data in addition to CCTV. CCTV inspections shall be NASSCO PACP compliant. The actual length to be inspected and inspection methods will be determined later based on pricing, field production, and available budget. During contracting, HSE and Contractor will determine the inspection equipment specifications.

Each “Priority” group below contains groupings of reaches, also listed in order of priority. We expect the Contractor will be able to inspect all the Priority 1 reaches. For Priority 2 reaches, the Contractor should inspect the first grouping and then move onto the second grouping, starting with the largest diameters reaches and working towards the smaller diameters. Within the grouping, the inspection Contractor will be allowed to select the order in which to inspect the reaches based on ease of access, traffic control, and other factors; however, the inspected reaches shall be contiguous as much as possible.

See the attached figures and spreadsheet for the candidate list of reaches planned for inspection.

Also provided are shapefiles of the sewer pipes and manholes. The two fields in the sewer pipes attribute table, [CCTV_Plan] and [Diam_CCTV], contain the designated grouping and the expected pipe diameters, respectively. Lengths are based off of the [MEASUREDLE] field. Groupings below have the same names as the inspection maps, with GIS attribute label [CCTV_Plan] in parentheses.

PRIORITY 1
Trunk A_P1 (Trunk1)
Reinforced concrete pipe (RCP), diameters of 33, 36, 39, 42, 54, and 66 inches. 37 reaches, total length 8,830 linear feet (lf). Provide option to perform 2D laser and sonar inspection on a portion of the pipeline.

Trunk B_P1 (Trunk2)
RCP and vitrified clay pipe (VCP), diameters of 27 and 33 inches. 24 reaches, total length 5,760 lf.

Trunk C_P1 (Trunk3)
RCP and VCP, diameters of 24 and 30 inches. 15 reaches, total length 4,850 lf.

SW Area 21-24_P1 (Sub_21-24)
Mostly VCP, diameters of 21 and 24 inches. 19 reaches, total length 4,520 lf.

SW Area 10-18_P1 (Sub_10-18)
Mostly VCP, diameters of 10, 12 ,15, and 18 inches. 162 reaches, total length 46,720 lf.

SW Area 8_P1 (Sub_8)
Mostly VCP, 8-inch-diameter, 26 reaches, total length 8,660 lf. 965
Item # 16.

P:\154000\154251-Milpitas Water - Sewer Master Plan\03_Condition Assessment\Inspection\Milpitas CCTV scope.docx P a g e | 2 PRIORITY 2
Misc 21-36_P2 (Sub_21-36_P2)
Mostly VCP, some RCP, diameters of 21, 24, 27, 30, 36 inches. 66 reaches, total length 16,890 lf.

Misc 12-18_P2 (Sub_12-18_P2)
Mostly VCP, diameters of 12 ,15, and 18 inches. 141 reaches, total length 31,000 lf.

CITY INSPECTIONS
To be inspected by City of Milpitas forces using City-owned equipment (WinCan). Mostly 6- and 8-inch-diameter VCP pipes. 389 reaches, total length 98,750 lf.

Manholes
There is no plan to perform MACP inspections on manholes; however, during CCTV inspection, the inspection Contractor shall capture video footage in each manhole to allow a basic assessment of manhole conditions.

Cleaning
Cleaning is not anticipated for sewers 15-inch-diameter and larger, and only targeted cleaning is anticipated for 8-inch- to 12-inch-diameter sewers. The Contractor shall attempt to inspect each sewer reach without cleaning. If unable to complete an inspection, mark the record “MSA” per NASSCO PACP, and alert the City immediately. Depending on availability, City forces may be dispatched to clean the pipe at that time, or may clean the pipe later for potential reinspection.

Estimated Pricing (based on communication with National Plant in November 2019) Diameter CCTV, per lf 2D Laser + Sonar, per lf
8-inch to 18-inch $1.61 n/a
21-inch $1.61 - $2.11 n/a
24-inch to 66-inch $2.11 – 2.40 $6.00
Attachments:

1. Pipe reach summary tables (count and total length by diameter)

2. Inspection plan maps
966
Item # 16.

City of Milpitas Inspection Plan
Pipe Reach Count
Count of FID * Column LabelsRow Labels 0 6 8 10 12 15 16 18 21 24 27 30 33 36 39 42 54 66 Grand TotalCity 10 220 114 22 13 7 2 1 389Trunk1 5 4 9 12 2 5 37Trunk2 21 3 24Trunk3 6 9 15Sub_21-24 11 8 19Sub_10-18 28 23 68 1 42 162Sub_8 26 26Sub_21-36_P2 35 5 4 13 9 66Sub_12-18_P2 1 72 43 1 24 141Grand Total 10 220 141 50 108 118 2 66 46 21 25 25 5 13 9 13 2 5 879 P:\154000\154251-Milpitas Water - Sewer Master Plan\03_Condition Assessment\Inspection\Milpitas CCTV Plan.xlsx 967 Item # 16.

City of Milpitas Inspection Plan
Pipe Reach Length
Sum of MEASUREDLE Column LabelsRow Labels 0 6 8 10 12 15 16 18 21 24 27 30 33 36 39 42 54 66 Grand TotalCity 1,198 59,521 28,690 5,158 2,785 1,123 250 11 98,736Trunk1 1,334 729 2,485 2,995 251 1,035 8,829Trunk2 4,716 1,045 5,761Trunk3 1,422 3,427 4,849Sub_21-24 3,205 1,311 4,516Sub_10-18 8,321 6,673 19,933 126 11,667 46,720Sub_8 8,663 8,663Sub_21-36_P2 7,897 1,368 781 4,242 2,599 16,887Sub_12-18_P2 134 15,803 9,972 68 5,024 31,001Grand Total 1,198 59,521 37,487 13,479 25,261 31,028 194 16,691 11,102 4,351 5,497 8,714 1,334 3,328 2,485 3,006 251 1,035 225,962 P:\154000\154251-Milpitas Water - Sewer Master Plan\03_Condition Assessment\Inspection\Milpitas CCTV Plan.xlsx 968
Item # 16.

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Document Path: P:\GIS\Milpitas\mxd\Milpitas_CCTV_Plan.mxd 11/8/2 019
7:51:11 P
M
E
Z
alkin
Legend
SS_Pipe

DIAMETER
<=6-inch
8-inch
10-15
16-23
24-36
>=39-inch
Unknown
Figure 1
Milpitas Sewer System
Pipe Diameters
0 0.4 0.8 1.6
Miles
±
969
Item # 16.

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Document Path: P:\GIS\Milpitas\mxd\Milpitas_CCTV_Plan_Expanded.mxd 11/14/2 019 11:5
2:11 A
M
E
Z
alkin
Legend
SS_Pipe
CCTV_Plan
Trunk A_P1
Trunk B_P1
Trunk C_P1
SW Area 21-24_P1
SW Area 10-18_P1
SW Area 8_P1
Misc 21-36_P2
Misc12-18_P2
City Crew
Not in Year 1 Plan
Figure 2
Milpitas Sewer System
CCTV Overview
0 0.25 0.5 1
Miles
±
970
Item # 16.

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
Document Path: P:\GIS\Milpitas\mxd\Milpitas_CCTV_Plan_Expanded.mxd 11/14/2 019 11:5
2:11 A
M
E
Z
alkin
Legend
SS_Pipe
CCTV_Plan
Trunk A_P1
Trunk B_P1
Trunk C_P1
SW Area 21-24_P1
SW Area 10-18_P1
SW Area 8_P1
Misc 21-36_P2
Misc12-18_P2
City Crew
Not in Year 1 Plan
Figure 3
Milpitas Sewer System
Trunk CCTV
0 0.125 0.25 0.5
Miles
±
971
Item # 16.

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
Document Path: P:\GIS\Milpitas\mxd\Milpitas_CCTV_Plan_Expanded.mxd 11/14/2 019 11:5
2:11 A
M
E
Z
alkin
Legend
SS_Pipe
CCTV_Plan
Trunk A_P1
Trunk B_P1
Trunk C_P1
SW Area 21-24_P1
SW Area 10-18_P1
SW Area 8_P1
Misc 21-36_P2
Misc 12-18_P2
City Crew
Not in Year 1 Plan
Figure 4
Milpitas Sewer System
SW Area CCTV
0 0.125 0.25 0.5
Miles
±
972
Item # 16.

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
Document Path: P:\GIS\Milpitas\mxd\Milpitas_CCTV_Plan_Expanded.mxd 11/14/2 019 11:5
7:17
A
M
E
Z
alkin
Legend
SS_Pipe
CCTV_Plan
Trunk A_P1
Trunk B_P1
Trunk C_P1
SW Area 21-24_P1
SW Area 10-18_P1
SW Area 8_P1
Misc 21-36_P2
Misc 12-18_P2
City Crew
Not in Year 1 Plan
Figure 5
Milpitas Sewer System
City Crew CCTV
0 0.125 0.25 0.5
Miles
±
973
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
Appendix C: QC Comments Log
974
Item # 16.

US
node ID
DS node
ID
Structure
quick
rating
Reviewed
by
QC Header
Information (UT26)
QC Coding
(UT27) QC General Comments (UT28) Inspection ID
Direction
of survey Height (in) Material
Length
surveyed
(ft)
Pipe
length (ft)
1148 2852 5341 DSkipper
Header information is
accurate.

From 276-282 there are multiple cracks. The
one that was coded was a continuous crack at
12 oclock but the camera doesnt look up to
clarify where this crack actually ends? And the
pipe is broken at 6 oclock, grade 5, at 276
1148_D_202005
01_0315 D 15 VCP 388.3 388
1417 979 4A31 DSkipper
Header information is
accurate.

Significant fractures from 30-90ft. Coded
correctly,.
1417_D_202004
23_0239 D 12 VCP 344.3 343
210 582 5134 DSkipper
Header information is
accurate.

Hole Soil Visible at 177, scored correctly as 5.

Survey incomplete, crawler unable to proceed
after 198 feet due to SIphon
210_D_2020042
1_2304 D 8 VCP 198.8 233
2229 2222 5141 DSkipper
Header information is
accurate. Broken VCP in two locations, coded correctly. 2229_D_202004
22_0512 D 12 VCP 218.7 218
2290 2652 3H2D DSkipper
Header information is
accurate.

Corrected pipe material and shape to 66" RCP
per defect log.
2290_U_202004
15_0447 U 66 RCP 193.6 200
2321 2317 3N2F DSkipper
Header information is
accurate. no additional comments
2321_D_202004
09_0528 D 39 RCP 236.1 238
2373 2391 3R00 DSkipper
Header information is
accurate.

DS MH does not exist. Geoplan indicates it
should have been at 415 feet. They continued
on until 430 feet and declared it nonexistent.
2373_D_202004
13_0537 D 39 RCP 430.1 415
2388 2373 3Y2G DSkipper
Header information is
accurate. No comments, operator was thorough
2388_D_202004
13_0500 D 39 RCP 374.3 370
2584 2321 3M2J DSkipper
Header information is
accurate. no additional comments
2584_U_202004
09_0435 U 39 RCP 367.7 372
2652 2650 3F00 DSkipper
Header information is
accurate.

Pipe material is marked as unknown. Pipe
appears to be lined
2652_U_202004
09_2343 U 62 XXX 148.8 157
2723 2735 3H2H DSkipper
Header information is
accurate.

Changed pipe length to 493 per the geoplan.

Inspection only made it part way to 231 ft due
to water level
2723_D_202004
10_0454 D 40 RCP 231.7 493
2724 2723 3G2F DSkipper
Header information is
accurate.

Correctedpipe size to 40" per comment in the
defect log.
2724_D_202004
10_0420 D 42 RCP 182.6 187
City of Milpitas - CCTV Review Summary
975
Item # 16.

US
node ID
DS node
ID
Structure
quick
rating
Reviewed
by
QC Header
Information (UT26)
QC Coding
(UT27) QC General Comments (UT28) Inspection ID
Direction
of survey Height (in) Material
Length
surveyed
(ft)
Pipe
length (ft)
2725 2724 3Z00 DSkipper
Header information is
accurate.

Why is unknown debris a continuous defect for
the entire pipe? There is enough flow to
obscure the bottom of pipe so not clear what
debris is being referenced.
2725_D_202004
10_0309 D 42 ZZZ 518.1 507
2726 2725 3W00 DSkipper
Header information is
accurate. Unable to disern pipe material due to liner.
2726_D_202004
10_0249 D 42 ZZZ 281.5 292
2840 2842 5B41 DSkipper
Header information is
accurate.

Coded correctly, several continuous cracks at 12
oclock, graded as a 5
2840_D_202005
01_0439 D 15 VCP 311.9 302
2852 2840 5142 DSkipper
Header information is
accurate. No additional comments, coded correctly
2852_D_202005
01_0356 D 15 VCP 500.3 499
340 352 5241 DSkipper
Header information is
accurate. no additional comments
340_D_2020040
3_0613 D 15 VCP 398.4 422
346 346A 412K DSkipper
Header information is
accurate.

Changed the fractures multiple at 4 feet to
broken. the VCP is definitely brokern, not
merely fractured.
346_D_2020040
3_0456 D 15 VCP 399.5 239.331
356A 356 4131 DSkipper
Header information is
accurate.

In IAM the survey direction was marked
incorrectly
356_U_2020040
6_0016 U 15 VCP 6.6 14.314
374 142 5126 DSkipper
Header information is
accurate.
142 is an undocumented manhole. downstream
survey was done beginning at 142 and
continuing on to 373.
374_D_2020042
8_0521 D 15 VCP 217.9
525 539 412D DSkipper
Header information is
accurate. inspection incomplete due to water level
525_D_2020040
7_0517 D 18 VCP 152.6 168
558 551 5233 DSkipper
Header information is
accurate.

Changed structural grade from 3 to 4 at 154
feet. Broken pipe later on in pipe scored as 5.
558_D_2020042
9_0306 D 15 VCP 226.5 216
572 570 512F DSkipper
Header information is
accurate.

Broken pipe at 333. Coded correctly as a five. No
other comments, looks properly coded.
572_D_2020042
9_0020 D 15 VCP 385.5 388
659 659A 432F DSkipper
Header information is
accurate. 659A- new uncharted manhole found.
659_D_2020040
8_0203 D 12 VCP 213.8 244.97
723 743 3P2R DSkipper
Header information is
accurate.

Video header indicates RCP but defect comment
log indicates could be Asbestos pipe. Changed in
infoasset to Asbestos Cement as pipe material.
723_D_2020041
7_0019 D 30 AC 433.1 432
976
Item # 16.

US
node ID
DS node
ID
Structure
quick
rating
Reviewed
by
QC Header
Information (UT26)
QC Coding
(UT27) QC General Comments (UT28) Inspection ID
Direction
of survey Height (in) Material
Length
surveyed
(ft)
Pipe
length (ft)
727 65 412M DSkipper
Header information is
accurate. Looks good, he stopped at all the taps.
727_D_2020043
0_0808 D 15 VCP 384.7
742A 738 3G2G DSkipper
742 should be changed
to 742A in the video
header. Video file labeled just as 742_738, not 742A
742A_U_202004
20_0208 U 30 RCP 220.7 135.744
743 742 3F2F DSkipper
Header information is
accurate.

Pipe material marked as unknown but comment
says possibly asbestos. MSA at 185ft - unable to
continue with survey. Incomplete Survey
743_D_2020041
7_0102 D 30 XXX 185.1 224
1019 2195 3A2O DSkipper
Header information is
accurate.

The SRI. SAV, and SSS codes seem to be used
concurrently and interchangeably. SSS used for
entire pipe but SAV and SRI used for just smaller
sections? Not clear what the difference is and
why codes were used like that. 1 D 24 VCP 370.5 368
1673 20134 442A DSkipper
Header information is
accurate. No additional comments 24 D 27 ZZZ 382 392
1805 1826 5232 DSkipper
Header information is
accurate. US survey only 18 feet. Everything looks good. 29 U 27 RCP 18.7 18 1826 1828 5H3J DSkipper
Header information is
accurate.

Video says VCP but recorded as RCP here in
infoasset (Correction Noted in Video starting
after 0.00 ft) 17 D 27 RCP 271.2 273
1828 1830 5D3D DSkipper
Header information is
accurate. no additional comments 18 D 27 RCP 146.7 142
1830 1831 5D3C DSkipper
Header information is
accurate.

SRC and SAV at 8.04: Defect Wanders? I don't
see what they mean. 19 D 27 RCP 110.3 109
1831 1846 5P3K DSkipper
Header information is
accurate.
at249.9 Is it TBD? Why defective? Correct to
another tap code? 20 D 27 RCP 318 319
1846 1847 5I3G DSkipper
Header information is
accurate.

60.60 is this actually TB? Or correct to TF? Same
for 99.3 - TBA or TBA? 21 D 27 RCP 222.2 225
2168 2181 3J2I DSkipper
Header information is
accurate.

MH 2391 Not Found. Pipe length was supposed
to be 415 ft and they continued to 430 ft before
indicating it was NF. Much of the video is
sideways or underwater but no fault of the
operator, flow was pretty high 3 D 24 RCP 299.2 297
977
Item # 16.

US
node ID
DS node
ID
Structure
quick
rating
Reviewed
by
QC Header
Information (UT26)
QC Coding
(UT27) QC General Comments (UT28) Inspection ID
Direction
of survey Height (in) Material
Length
surveyed
(ft)
Pipe
length (ft)
2195 2168 3T2P DSkipper
Header information is
accurate. No additional comments 2 D 24 RCP 365.4 368
2237 2240 3S2Z DSkipper
Header information is
accurate.

Video is really blurry. SSS and SAV used
concurrently/interchangeably for entirety of
pipe. Two SAV scores added for continuous
sections with significant wall loss 11 D 30 XXX 502.4 500 2240 2241 3R2Z DSkipper
Header information is
accurate. Video is unfocused 16 D 30 XXX 497.5 497
2241 2592 3S2R DSkipper
Header information is
accurate. Video is unfocused 13 U 30 XXX 505.7 505
2284 2237 3E2Z DSkipper
Header information is
accurate. No additional comments 10 D 30 ZZZ 519.2 519
2487 2634 2R11 DSkipper
Header information is
accurate.
unclear why there is a comment about not
being able to find the upstream MH. It was
found near where it was supposed to be, pipe
length indicated as 505 feet. 94 U 18 VCP 498.5 505
2589 2577 3R2Y DSkipper
Header information is
accurate.

Video is blurry due to steam. Unfocused but still
viewable 14 D 30 XXX 501.4 520
2592 2589 3R2Q DSkipper
Header information is
accurate. No additional comments 12 U 30 XXX 501 502
2837 2838 3K29 DSkipper
Header information is
accurate. No additional comments. 90 D 18 VCP 368.4 363 2844 2845A 5346 DSkipper
Header information is
accurate. No additional comments 125 D 15 VCP 117.2 76.827 2845 2834 5233 DSkipper
Header information is
accurate. Everything looks accurate 124 D 15 VCP 362.3 361 377 376A 512N DSkipper
Header information is
accurate.

Why did they end at uncharted MH 376A and
not continue to 376? 135 D 15 VCP 449.4 342.098
389 390 2911 DSkipper
Header information is
accurate.

Pipe lined. nothing much of interest. Deposits
throughout and one tap 114 D 10 PE 300.5 302
978
Item # 16.

US
node ID
DS node
ID
Structure
quick
rating
Reviewed
by
QC Header
Information (UT26)
QC Coding
(UT27) QC General Comments (UT28) Inspection ID
Direction
of survey Height (in) Material
Length
surveyed
(ft)
Pipe
length (ft)
393 401 5131 DSkipper
Header information is
accurate. no additional comments 104 D 12 VCP 302.3 307 404 378 0 DSkipper
Header information is
accurate.

US MH found via CCTV but not found above
ground. PAved over. 133 U 15 VCP 258.7 254
523 542 4131 DSkipper
Header information is
accurate. no additional comments 64 D 18 VCP 398.9 423
542 602 5146 DSkipper
Header information is
accurate. no additional comments 65 D 18 VCP 299.4 275
543 592 4131 DSkipper
Header information is
accurate.

Looks good - Survey stopped due to crawler
unable to get over rock 61 D 18 VCP 277.1 378
543 592 422A DSkipper
Header information is
accurate. No additional comments 62 U 18 VCP 93.4 378
592 586 544A DSkipper
Header information is
accurate. no additional comments 63 D 18 VCP 412 410
605 607 2J00 DSkipper
Header information is
accurate. Pipe is lined all the way through. 49 D 12 ZZZ 578.3 578 725 732 5131 DSkipper
Header information is
accurate. No additional comments 131 D 8 VCP 325.2 325
1045 1037 2D00 DHill
Header information is
accurate. No additional comments
1045_D_202005
04_0220 D 12 VCP 169.5 157
1060 1145 2I11 DHill
Header information is
accurate No additional comments
1060_D_202005
05_0006 D 12 VCP 293.9 292
1113 1149 5531 DHill
Header information is
accurate
Changed
broken to
fractures
multiple No additional comments
1113_D_202005
04_0347 D 12 VCP 302.5 303
1149 1151 2500 DHill
Header information is
accurate No additional comments
1149_D_202005
04_0410 D 12 VCP 296.3 295
979
Item # 16.

US
node ID
DS node
ID
Structure
quick
rating
Reviewed
by
QC Header
Information (UT26)
QC Coding
(UT27) QC General Comments (UT28) Inspection ID
Direction
of survey Height (in) Material
Length
surveyed
(ft)
Pipe
length (ft)
1152 1148 522C DHill
Header information is
accurate
Changed
broken to
fracture
multiple No additional comments
1152_U_202005
04_0501 U 15 VCP 479.2 481
1165 1143 2H00 DHill
Header information is
accurate. No additional comments
1165_D_202005
04_2301 D 12 VCP 299.5 294
157 527 5100 DHill
Header information is
accurate Camera blocked by debris
157_D_2020050
6_0601 D 18 VCP 46.6
2015 2743 4131 DHill
Header information is
accurate No additional comments
2015_D_202005
15_0132 D 18 VCP 44.2 45
2076 2088 2400 DHill
Header information is
accurate No additional comments
2076_U_202005
12_0415 U 12 VCP 252.1 288
2078 2076 512G DHill
Header information is
accurate
Changed
broken to
factures
multiple No additional comments
2078_U_202005
12_0444 U 12 VCP 496.7 364
2089 2093 2900 DHill
header information is
accurate No additional comments
2089_D_202005
07_0027 D 18 VCP 65.4 64
2094 2205 2G00 DHill
header information is
accurate No additional comments
2094_D_202005
07_0053 D 18 VCP 218.6 217
2219 2204 2B00 DHill
Header information is
accurate No additional comments
2219_D_202005
07_2352 D 15 VCP 370 397
2358 2658 3G2F DHill
Header information is
accurate No additional comments
2358_D_202005
14_0437 D 33 RCP 199.4 200
2359 2358 3400 DHill
Header information is
accurate No additional comments
2359_D_202005
14_0425 D 33 RCP 21.7 24
2391 2359 3722 DHill
Header information is
accurate No additional comments
2391_U_202005
14_0326 U 39 RCP 313.2 318
2529 2602 2F00 DHill
Header information is
accurate No additional comments
2529_D_202005
12_0020 D 12 PE 240.5 251
980
Item # 16.

US
node ID
DS node
ID
Structure
quick
rating
Reviewed
by
QC Header
Information (UT26)
QC Coding
(UT27) QC General Comments (UT28) Inspection ID
Direction
of survey Height (in) Material
Length
surveyed
(ft)
Pipe
length (ft)
2534 2533 2F14 DHill
Header information is
accurate no additional comments
2534_U_202005
15_0018 U 15 PE 287.3 292
2602 2593 3D26 DHill
Header information is
accurate No additional comments
2602_D_202005
12_0048 D 12 PE 165.5 161
2638 2736 352F DHill
Header information is
accurate Camera is blocked by debris
2638_D_202005
11_0002 D 18 VCP 230.6 446
2658 2661 3H2H DHill
Header information is
accurate No additional comments
2658_D_202005
14_0456 D 33 RCP 231.5 349
2658 2661 3525 DHill
Header information is
accurate Camera is blocked by debris
2658_U_202005
14_0549 U 33 RCP 24.8 349
2666 2638 3A2M DHill
Header information is
accurate No additional comments
2666_D_202005
11_0131 D 18 VCP 526.4 524
2714 2718 3321 DHill
Header information is
accurate Camera is blocked by debris
2714_U_202005
14_0051 U 42 RCP 21.2 392
2753 2759 3I2I DHill
Changed pipe material
to RCP No additional comments
2753_U_202005
15_0319 U 18 DIP 274.8 272
2760C 2760D 1200 DHill
MH numbers do not
match GIS Need contrator map to match to GIS
2760C_D_20200
515_0432 D 18 PVC 148.4
372 152 0 DHill
Manhole numbers do
not match GIS Need contrator map to match to GIS
372_D_2020050
6_0507 D 18 VCP 87
547 681 3C00 DHill
Header information is
accurate No additionl comments
547_D_2020050
7_2242 D 15 VCP 126.9 136
604 605 0 DHill
Header information is
accurate No additional comments
604_D_2020050
7_2136 D 15 VCP 0 102
160 161 342B DHill
Manhole numbers do
not match GIS Need info from contractor to associate with GIS 160_D_2020050
6_0646 D 18 VCP 253.6
981
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
Appendix D: CCTV Structural Scores Map
982
Item # 16.

Sewer Asset Renewal and Replacement Study
City of Milpitas
Structural Score Map
REPORT
SITE

MAP TITLE
DATE
8/31/2020
Legend
Structural Peak Score
1 - Minor Defects
2 - Defects that have not begun to deteriorate
3 - Moderate defects that will continue to deteriorate
4 - Severe defects
5 - Defects requiring attention soon
No CCTV Data
0 0.5 1
Miles ±
983
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
Appendix E: CCTV O&M Scores Map
984
Item # 16.

Sewer Asset Renewal and Replacement Study
City of Milpitas
O&M Score Map
REPORT
SITE

MAP TITLE
DATE
8/31/2020
Legend
O&M Peak Score
1 - Minor Defects
2 - Defects that have not begun to deteriorate
3 - Moderate defects that will continue to deteriorate
4 - Severe defects
5 - Defects requiring attention soon
No CCTV Data
0 0.5 1
Miles ±
985
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
Appendix F: Risk Table and GIS
986
Item # 16.

This Appendix is a file export from Microsoft Excel.
987
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
Appendix G: Risk Maps
988
Item # 16.

This Appendix is not used.
989
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
Appendix H: Defect-Level Rehabilitation Methods
990
Item # 16.

Defect
Code
Default
Score Type Description Rehab. Method Alternative Method Comments Clock
Pos.

Grade1
Clock
Pos.

Grade2
Clock
Pos.

Grade3
Clock
Pos.

Grade4
Value %
Grade1
Value %
Grade2
Value %
Grade3
Value %
Grade4
Alter.

Rehab.

Cutoff
ACB 0 CONSTRUCTION Catch Basin 0 0 0 0 0 0 0 0
ACOH 0 CONSTRUCTION Cleanout House 0 0 0 0 0 0 0 0
ACOM 0 CONSTRUCTION Cleanout Mainline 0 0 0 0 0 0 0 0
ACOP 0 CONSTRUCTION Cleanout Property line 0 0 0 0 0 0 0 0 ACOS 0 MISCELLANEOUS Cleanout Saddle 0 0 0 0 0 0 0 0
ADP 0 CONSTRUCTION Discharge Point 0 0 0 0 0 0 0 0
AEP 0 CONSTRUCTION End of Pipe 0 0 0 0 0 0 0 0
AJB 0 CONSTRUCTION Junction Box 0 0 0 0 0 0 0 0
AM 0 CONSTRUCTION Meter 0 0 0 0 0 0 0 0
AMH 0 CONSTRUCTION Manhole 0 0 0 0 0 0 0 0
AML 0 MISCELLANEOUS Mainline 0 0 0 0 0 0 0 0
AOC 0 CONSTRUCTION Special Chamber 0 0 0 0 0 0 0 0
ATC 0 CONSTRUCTION Tee Connection 0 0 0 0 0 0 0 0
AW 0 MISCELLANEOUS Wye 0 0 0 0 0 0 0 0
AWA 0 CONSTRUCTION Wastewater Access
Device 0 0 0 0 0 0 0 0
AWD 0 MISCELLANEOUS Double Wye 0 0 0 0 0 0 0 0
AWW 0 CONSTRUCTION Wet Well 0 0 0 0 0 0 0 0
AZ 0 MISCELLANEOUS Access Point Other 0 0 0 0 0 0 0 0
B 4 STRUCTURAL Broken LINING LINING 0 0 1 2 0 0 0 0
BSV 5 STRUCTURAL Broken Soil Visible POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 BVV 5 STRUCTURAL Broken Void Visible POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 CC 1 STRUCTURAL Crack Circumferential LINING LINING 0 0 0 0 0 0 0 0 CH2 2 STRUCTURAL Crack Longitudinal
Hinge, 2 LINING LINING 0 0 0 0 0 0 0 0
CH3 3 STRUCTURAL Crack Longitudinal
Hinge, 3 LINING LINING 0 0 0 0 0 0 0 0
CH4 4 STRUCTURAL Crack Longitudinal
Hinge, 4 LINING LINING 0 0 0 0 0 0 0 0
CI 0 CONSTRUCTION Intruding Connection HEAVY

CLEANING
HEAVY
CLEANING 0 0 0 0 0 0 0 0
CL 2 STRUCTURAL Crack Longitudinal LINING LINING 0 0 0 0 0 0 0 0 CM 3 STRUCTURAL Crack Multiple LINING LINING 0 0 0 0 0 0 0 0 CN 0 CONSTRUCTION Connection 0 0 0 0 0 0 0 0
CS 2 STRUCTURAL Crack Spiral LINING LINING 0 0 0 0 0 0 0 0 CU 0 MISCELLANEOUS Camera Underwater 0 0 0 0 0 0 0 0
CX 0 MISCELLANEOUS Defective Connection POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 991
Item # 16.

Defect
Code
Default
Score Type Description Rehab. Method Alternative Method Comments Clock
Pos.

Grade1
Clock
Pos.

Grade2
Clock
Pos.

Grade3
Clock
Pos.

Grade4
Value %
Grade1
Value %
Grade2
Value %
Grade3
Value %
Grade4
Alter.

Rehab.

Cutoff
D 0 MISCELLANEOUS Deformed POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 10 DAE 0 SERVICE Deposits Attached
Encrustation CLEANING CLEANING 0 0 0 0 0 10 20 30
DAGS 0 SERVICE Deposits Attached
Grease CLEANING CLEANING 0 0 0 0 0 10 20 30
DAR 0 SERVICE Deposits Attached
Ragging CLEANING CLEANING 0 0 0 0 0 10 20 30
DAZ 0 MISCELLANEOUS Deposits Attached
Other CLEANING CLEANING 0 0 0 0 0 10 20 30
DB 3 STRUCTURAL Displaced Brick POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 DBFI 5 MISCELLANEOUS
Deformed Flexible
Bulging Inverse
Curvature
POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
DC 0 MISCELLANEOUS Change in Sewer
Dimension 0 0 0 0 0 0 0 0
DE 0 MISCELLANEOUS Debris CLEANING CLEANING 0 0 0 0 0 0 0 0 DFBR 0 MISCELLANEOUS Deformed Flexible
Bulging Round 0 0 5 10 0 0 0 0
DFC 5 MISCELLANEOUS Deformed Flexible
Bulging Creasing POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 DFE 3 MISCELLANEOUS Deformed Flexible
Elliptical LINING LINING 0 0 0 0 0 0 0 0
DG 0 MISCELLANEOUS Debris Grease CLEANING CLEANING 0 0 0 0 0 0 0 0 DH 5 MISCELLANEOUS Deformed Horizontal
Brick POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
DI 5 STRUCTURAL Dropped Invert POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 DNF 0 SERVICE Deposits Ingressed
Fine CLEANING CLEANING 0 0 0 0 0 10 20 30
DNGV 0 SERVICE Deposits Ingressed
Gravel CLEANING CLEANING 0 0 0 0 0 10 20 30
DNZ 0 SERVICE Deposits Ingressed
Other CLEANING CLEANING 0 0 0 0 0 10 20 30
DR 0 MISCELLANEOUS Deformed Rigid POINT REPAIR POINT REPAIR 0 0 0 5 0 0 0 0 DS 0 MISCELLANEOUS Debris Silt CLEANING CLEANING 0 0 0 0 0 0 0 0 DSC 0 SERVICE Deposits Settled
Compacted CLEANING CLEANING 0 0 0 0 0 10 20 30
DSF 0 SERVICE Deposits Settled Fine CLEANING CLEANING 0 0 0 0 0 10 20 30 DSGV 0 SERVICE Deposits Settled
Gravel CLEANING CLEANING 0 0 0 0 0 10 20 30
992
Item # 16.

Defect
Code
Default
Score Type Description Rehab. Method Alternative Method Comments Clock
Pos.

Grade1
Clock
Pos.

Grade2
Clock
Pos.

Grade3
Clock
Pos.

Grade4
Value %
Grade1
Value %
Grade2
Value %
Grade3
Value %
Grade4
Alter.

Rehab.

Cutoff
DSZ 0 SERVICE Deposits Settled Other CLEANING CLEANING 0 0 0 0 0 10 20 30 DTBI 5 MISCELLANEOUS
Deformed Brick
Bulging Inverse
Curvature
POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
DTBR 0 MISCELLANEOUS Deformed Brick
Bulging Round 0 0 0 5 0 0 0 0
DV 5 STRUCTURAL Deformed Vertical
Brick POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
FBEM 0 MISCELLANEOUS 0 0 0 0 0 0 0 0
FBEMD 0 STRUCTURAL Fitting Mitered Bend
Down 0 0 0 0 0 0 0 0
FBEMLD 0 STRUCTURAL Fitting Mitered Bend
Left Down 0 0 0 0 0 0 0 0
FBEMLU 0 STRUCTURAL Fitting Mitered Bend
Left Up 0 0 0 0 0 0 0 0
FBEMR 0 STRUCTURAL Fitting Mitered Bend
Right 0 0 0 0 0 0 0 0
FBEMRD 0 STRUCTURAL Fitting Mitered Bend
Right Down 0 0 0 0 0 0 0 0
FBEMRU 0 STRUCTURAL Fitting Mitered Bend
Right Up 0 0 0 0 0 0 0 0
FBEMU 0 STRUCTURAL Fitting Mitered Bend
Up 0 0 0 0 0 0 0 0
FBES 0 MISCELLANEOUS 0 0 0 0 0 0 0 0
FBESD 0 STRUCTURAL Fitting Sweep Bend
Down 0 0 0 0 0 0 0 0
FBESL 0 STRUCTURAL Fitting Sweep Bend
Left 0 0 0 0 0 0 0 0
FBESLD 0 STRUCTURAL Fitting Sweep Bend
Left Down 0 0 0 0 0 0 0 0
FBESLU 0 STRUCTURAL Fitting Sweep Bend
Left Up 0 0 0 0 0 0 0 0
FBESR 0 STRUCTURAL Fitting Sweep Bend
Right 0 0 0 0 0 0 0 0
FBESRD 0 STRUCTURAL Fitting Sweep Bend
Right Down 0 0 0 0 0 0 0 0
FBESRU 0 STRUCTURAL Fitting Sweep Bend
Right Up 0 0 0 0 0 0 0 0
FBESU 0 STRUCTURAL Fitting Sweep Bend
Up 0 0 0 0 0 0 0 0
FC 2 STRUCTURAL Fracture
Circumferential LINING LINING 0 0 0 0 0 0 0 0
FCA 0 MISCELLANEOUS Fitting Cap 0 0 0 0 0 0 0 0
FCAF 0 MISCELLANEOUS Fitting Cap Fitting 0 0 0 0 0 0 0 0 993
Item # 16.

Defect
Code
Default
Score Type Description Rehab. Method Alternative Method Comments Clock
Pos.

Grade1
Clock
Pos.

Grade2
Clock
Pos.

Grade3
Clock
Pos.

Grade4
Value %
Grade1
Value %
Grade2
Value %
Grade3
Value %
Grade4
Alter.

Rehab.

Cutoff
FCAS 0 MISCELLANEOUS Fitting Cap Seal 0 0 0 0 0 0 0 0
FH2 3 STRUCTURAL Fracture Longitudinal
Hinge, 2 LINING LINING 0 0 0 0 0 0 0 0
FH3 4 STRUCTURAL Fracture Longitudinal
Hinge, 3 LINING LINING 0 0 0 0 0 0 0 0
FH4 4 STRUCTURAL Fracture Longitudinal
Hinge, 4 LINING LINING 0 0 0 0 0 0 0 0
FL 3 STRUCTURAL Fracture Longitudinal LINING LINING 0 0 0 0 0 0 0 0 FM 4 STRUCTURAL Fracture Multiple LINING LINING 0 0 0 0 0 0 0 0 FRV 0 MISCELLANEOUS Fitting Vertical Riser 0 0 0 0 0 0 0 0 FS 3 STRUCTURAL Fracture Spiral LINING LINING 0 0 0 0 0 0 0 0 FTDS 0 MISCELLANEOUS Fitting Double Sweep
Tee 0 0 0 0 0 0 0 0
FTS 0 MISCELLANEOUS Fitting Sweep Tee 0 0 0 0 0 0 0 0
GRT 0 MISCELLANEOUS Grout at a Location 0 0 0 0 0 0 0 0 GTFJ 0 MISCELLANEOUS Grout Test Fail Joint 0 0 0 0 0 0 0 0 GTFL 0 MISCELLANEOUS Grout Test Fail Lateral 0 0 0 0 0 0 0 0 GTPJ 0 MISCELLANEOUS Grout Test Pass Joint 0 0 0 0 0 0 0 0 GTPL 0 MISCELLANEOUS Grout Test Pass
Lateral 0 0 0 0 0 0 0 0
GTUJ 0 MISCELLANEOUS Grout Test Unable to
Test Joint 0 0 0 0 0 0 0 0
GTUL 0 MISCELLANEOUS Grout Test Unable to
Test Lateral 0 0 0 0 0 0 0 0
H 0 STRUCTURAL Hole POINT REPAIR POINT REPAIR 0 0 0 2 0 0 0 0 HSV 5 STRUCTURAL Hole Soil Visible POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 HVV 5 STRUCTURAL Hole Void Visible POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 ID 3 MISCELLANEOUS Infil Dripper LINING LINING 0 0 0 0 0 0 0 0 IDB 3 SERVICE Infiltration Dripper
Barrel LINING LINING 0 0 0 0 0 0 0 0
IDC 3 SERVICE Infiltration Dripper
Connection LINING LINING 0 0 0 0 0 0 0 0
IDJ 3 SERVICE Infiltration Dripper
Joint LINING LINING 0 0 0 0 0 0 0 0
994
Item # 16.

Defect
Code
Default
Score Type Description Rehab. Method Alternative Method Comments Clock
Pos.

Grade1
Clock
Pos.

Grade2
Clock
Pos.

Grade3
Clock
Pos.

Grade4
Value %
Grade1
Value %
Grade2
Value %
Grade3
Value %
Grade4
Alter.

Rehab.

Cutoff
IDL 3 SERVICE Infiltration Dripper
Lateral LINING LINING 0 0 0 0 0 0 0 0
IG 5 MISCELLANEOUS Infil Gusher LINING LINING 0 0 0 0 0 0 0 0 IGB 5 SERVICE Infiltration Gusher
Barrel LINING LINING 0 0 0 0 0 0 0 0
IGC 5 SERVICE Infiltration Gusher
Connection LINING LINING 0 0 0 0 0 0 0 0
IGJ 5 SERVICE Infiltration Gusher
Joint LINING LINING 0 0 0 0 0 0 0 0
IGL 5 SERVICE Infiltration Gusher
Lateral LINING LINING 0 0 0 0 0 0 0 0
IR 4 SERVICE Infil Runner LINING LINING 0 0 0 0 0 0 0 0 IRB 4 SERVICE Infiltration Runner
Barrel LINING LINING 0 0 0 0 0 0 0 0
IRC 4 SERVICE Infiltration Runner
Connection LINING LINING 0 0 0 0 0 0 0 0
IRJ 4 SERVICE Infiltration Runner
Joint LINING LINING 0 0 0 0 0 0 0 0
IRL 4 SERVICE Infiltration Runner
Lateral LINING LINING 0 0 0 0 0 0 0 0
IS 1 SERVICE Infil Stain 0 0 0 0 0 0 0 0
ISB 1 SERVICE Infiltration Stain Barrel 0 0 0 0 0 0 0 0 ISC 1 SERVICE Infiltration Stain
Connection 0 0 0 0 0 0 0 0
ISGT 0 CONSTRUCTION Intruding Sealing
Material Grout
HEAVY

CLEANING
HEAVY
CLEANING 0 0 0 0 0 10 20 30
ISJ 1 SERVICE Infiltration Stain Joint 0 0 0 0 0 0 0 0
ISL 1 SERVICE Infiltration Stain
Lateral 0 0 0 0 0 0 0 0
ISSR 0 CONSTRUCTION Intruding Sealing
Material Sealing Ring
HEAVY

CLEANING
HEAVY
CLEANING 0 0 0 0 0 10 20 30
ISSRB 0 CONSTRUCTION
Intruding Sealing
Material Sealing Ring
Broken
HEAVY

CLEANING
HEAVY
CLEANING 0 0 0 0 0 10 20 30
ISSRH 0 CONSTRUCTION
Intruding Sealing
Material Sealing Ring
Hanging
HEAVY

CLEANING
HEAVY
CLEANING 0 0 0 0 0 10 20 30
ISSRL 0 CONSTRUCTION
Intruding Sealing
Material Sealing Ring
Loose/Poor
HEAVY

CLEANING
HEAVY
CLEANING 0 0 0 0 0 10 20 30
ISZ 0 CONSTRUCTION Intruding Sealing
Material Other
HEAVY

CLEANING
HEAVY
CLEANING 0 0 0 0 0 10 20 30
995
Item # 16.

Defect
Code
Default
Score Type Description Rehab. Method Alternative Method Comments Clock
Pos.

Grade1
Clock
Pos.

Grade2
Clock
Pos.

Grade3
Clock
Pos.

Grade4
Value %
Grade1
Value %
Grade2
Value %
Grade3
Value %
Grade4
Alter.

Rehab.

Cutoff
IW 2 SERVICE Infil Weeper 0 0 0 0 0 0 0 0
IWB 2 SERVICE Infiltration Weeper
Barrel 0 0 0 0 0 0 0 0
IWC 2 SERVICE Infiltration Weeper
Connection 0 0 0 0 0 0 0 0
IWJ 2 SERVICE Infiltration Weeper
Joint 0 0 0 0 0 0 0 0
IWL 2 SERVICE Infiltration Weeper
Lateral 0 0 0 0 0 0 0 0
JAL 4 STRUCTURAL Joint Angular Large POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 JAM 3 MISCELLANEOUS Joint Angular Medium LINING LINING 0 0 0 0 0 0 0 0 JAS 0 MISCELLANEOUS Joint Angular Small 0 0 0 0 0 0 0 0 JL 0 STRUCTURAL Displaced Joint Large POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 JM 0 STRUCTURAL Displaced Joint
Medium LINING LINING 0 0 0 0 0 0 0 0
JOL 4 STRUCTURAL Joint Offset Large POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 JOLD 4 MISCELLANEOUS Joint Offset Large
Defective POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
JOM 3 STRUCTURAL Joint Offset Medium LINING LINING 0 0 0 0 0 0 0 0 JOMD 3 MISCELLANEOUS Joint Offset Medium
Defective LINING LINING 0 0 0 0 0 0 0 0
JOS 0 MISCELLANEOUS Joint Offset Small 0 0 0 0 0 0 0 0
JOSD 0 MISCELLANEOUS Joint Offset Small
Defective 0 0 0 0 0 0 0 0
JSL 4 STRUCTURAL Joint Separated Large POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 JSM 3 STRUCTURAL Joint Separated
Medium POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
JSS 0 MISCELLANEOUS Joint Seprated Small 0 0 0 0 0 0 0 0 KD 0 MISCELLANEOUS Buckling Dimpling 0 0 0 0 0 0 0 0
KI 0 MISCELLANEOUS Inverse Curvature 0 0 0 0 0 0 0 0
KW 0 MISCELLANEOUS Buckling Wall 0 0 0 0 0 0 0 0
LC 0 MISCELLANEOUS Change in Sewer
Lining 0 0 0 0 0 0 0 0
LD 0 SERVICE Line Down 0 0 0 0 10 20 0 20
LFAC 0 STRUCTURAL
Lining Feature
Abandoned
Connection
POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
996
Item # 16.

Defect
Code
Default
Score Type Description Rehab. Method Alternative Method Comments Clock
Pos.

Grade1
Clock
Pos.

Grade2
Clock
Pos.

Grade3
Clock
Pos.

Grade4
Value %
Grade1
Value %
Grade2
Value %
Grade3
Value %
Grade4
Alter.

Rehab.

Cutoff
LFAS 3 STRUCTURAL Lining Feature Annular
Space LINING LINING 0 0 0 0 0 0 0 0
LFB 3 STRUCTURAL Lining Feature
Blistered POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
LFBK 3 STRUCTURAL Lining Failure Buckled POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 LFBU 3 STRUCTURAL Lining Failure Bulges LINING LINING 0 0 0 0 0 0 0 0 LFCS 3 STRUCTURAL Lining Feature Service
Cut Shifted LINING LINING 0 0 0 0 0 0 0 0
LFD 3 STRUCTURAL Lining Feature
Detached LINING LINING 0 0 0 0 0 0 0 0
LFDC 3 STRUCTURAL Lining Feature
Discoloration LINING LINING 0 0 0 0 0 0 0 0
LFDE 3 STRUCTURAL Lining Feature
Defective End LINING LINING 0 0 0 0 0 0 0 0
LFDL 3 STRUCTURAL Lining Feature
Delaminating LINING LINING 0 0 0 0 0 0 0 0
LFOC 3 STRUCTURAL Lining Feature
Overcut Service LINING LINING 0 0 0 0 0 0 0 0
LFPH 3 MISCELLANEOUS Lining Failure Pinhole LINING LINING 0 0 0 0 0 0 0 0 LFRS 3 Lining Failure Resin
slug LINING LINING 0 0 0 0 0 0 0 0
LFUC 3 STRUCTURAL Lining Feature
Undercut Service LINING LINING 0 0 0 0 0 0 0 0
LFW 3 STRUCTURAL Lining Feature
Wrinkled LINING LINING 0 0 0 0 0 0 0 0
LFZ 0 STRUCTURAL Lining Feature Other LINING LINING 0 0 0 0 0 0 0 0 LL 0 CONSTRUCTION Line Left 0 0 0 0 10 20 20 100
LLD 0 CONSTRUCTION Line Left Down 0 0 0 0 10 20 20 100
LLU 0 CONSTRUCTION Ling Left Up 0 0 0 0 10 20 20 100
LN 0 CONSTRUCTION Lining Defect 0 0 0 0 0 0 0 0
LR 0 CONSTRUCTION Line Right 0 0 0 0 10 20 20 100
LRD 0 CONSTRUCTION Line Right Down 0 0 0 0 10 20 20 100 LRU 0 CONSTRUCTION Line Right Up 0 0 0 0 10 20 20 100
LU 0 SERVICE Line Up 0 0 0 0 10 20 20 100
MB 4 STRUCTURAL Missing Brick LINING LINING 0 0 0 0 0 0 0 0 MC 0 MISCELLANEOUS Change in Sewer
Material 0 0 0 0 0 0 0 0
MCU 4 MISCELLANEOUS Miscellaneous Camera
Underwater LINING LINING 0 0 0 0 0 0 0 0
997
Item # 16.

Defect
Code
Default
Score Type Description Rehab. Method Alternative Method Comments Clock
Pos.

Grade1
Clock
Pos.

Grade2
Clock
Pos.

Grade3
Clock
Pos.

Grade4
Value %
Grade1
Value %
Grade2
Value %
Grade3
Value %
Grade4
Alter.

Rehab.

Cutoff
MGO 0 MISCELLANEOUS Miscellaneous General
Observation 0 0 0 0 0 0 0 0
MGP 0 MISCELLANEOUS Miscellaneous General
Photograph 0 0 0 0 0 0 0 0
MH 0 MISCELLANEOUS Manhole 0 0 0 0 0 0 0 0
MJL 0 MISCELLANEOUS Miscellaneous Pipe
Joint Length Change 0 0 0 0 0 0 0 0
MLC 0 MISCELLANEOUS Miscellaneous Lining
Change 0 0 0 0 0 0 0 0
MMC 0 MISCELLANEOUS Miscellaneous Material
Change 0 0 0 0 0 0 0 0
MML 3 MISCELLANEOUS Missing Mortar Large LINING LINING 0 0 0 0 0 0 0 0 MMM 3 MISCELLANEOUS Missing Mortar
Medium LINING LINING 0 0 0 0 0 0 0 0
MMS 2 MISCELLANEOUS Missing Mortar Small 0 0 0 0 0 0 0 0 MSA 0 MISCELLANEOUS Miscellaneous Survey
Abandoned 0 0 0 0 0 0 0 0
MSC 0 MISCELLANEOUS Miscellaneous
Shape/Size Change 0 0 0 0 0 0 0 0
MU 0 MISCELLANEOUS Unplotted Manhole 0 0 0 0 0 0 0 0
MWL 0 MISCELLANEOUS Miscellaneous Water
Level 0 0 0 0 0 0 0 0
MWLS 0 STRUCTURAL Miscellaneous Water
Level Sag 0 0 0 0 0 30 50 75
MWM 0 MISCELLANEOUS Miscellaneous Water
Mark 0 0 0 0 49 49 49 75
MYN 3 MISCELLANEOUS Miscellaneous Dye
Test Not Visible LINING LINING 0 0 0 0 0 0 0 0
MYV 5 MISCELLANEOUS Miscellaneous Dye
Test Visible LINING LINING 0 0 0 0 0 0 0 0
OB 0 SERVICE Obstruction POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 OBB 0 SERVICE Obstruction Brick or
Masonry POINT REPAIR POINT REPAIR 0 0 0 0 0 10 20 30
OBC 0 SERVICE Obstruction Through
Connection POINT REPAIR POINT REPAIR 0 0 0 0 0 10 20 30 OBI 5 SERVICE Obstruction Intruding
Through Wall POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
998
Item # 16.

Defect
Code
Default
Score Type Description Rehab. Method Alternative Method Comments Clock
Pos.

Grade1
Clock
Pos.

Grade2
Clock
Pos.

Grade3
Clock
Pos.

Grade4
Value %
Grade1
Value %
Grade2
Value %
Grade3
Value %
Grade4
Alter.

Rehab.

Cutoff
OBJ 0 SERVICE Obstruction Wedged
In The Joint POINT REPAIR POINT REPAIR 0 0 0 0 0 10 20 30 OBM 0 SERVICE Obstruction Pipe
Material in Invert POINT REPAIR POINT REPAIR 0 0 0 0 0 10 20 30 OBN 0 SERVICE Obstruction
Construction Debris POINT REPAIR POINT REPAIR 0 0 0 0 0 10 20 30 OBP 0 SERVICE Obstruction External
Pipe or Cable POINT REPAIR POINT REPAIR 0 0 0 0 0 10 20 30 OBR 0 SERVICE Obstruction Rocks POINT REPAIR POINT REPAIR 0 0 0 0 0 10 20 30 OBS 0 SERVICE Obstruction Built Into
Structure POINT REPAIR POINT REPAIR 0 0 0 0 0 10 20 30
OBZ 0 SERVICE Obstruction Other POINT REPAIR POINT REPAIR 0 0 0 0 0 10 20 30 OL 0 STRUCTURAL Open Joint Large POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 OM 0 STRUCTURAL Open Joint Medium POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 QH 0 STRUCTURAL Corrosion Heavy LINING LINING 0 0 0 0 0 0 0 0 QL 0 STRUCTURAL Corrosion Light LINING LINING 0 0 0 0 0 0 0 0 QM 0 STRUCTURAL Corrosion Medium LINING LINING 0 0 0 0 0 0 0 0 RBB 5 SERVICE Roots Ball Barrel HEAVY

CLEANING
HEAVY
CLEANING 0 0 0 0 0 0 0 0
RBC 4 SERVICE Roots Ball Connection HEAVY

CLEANING
HEAVY
CLEANING 0 0 0 0 0 0 0 0
RBJ 4 SERVICE Roots Ball Joint HEAVY

CLEANING
HEAVY
CLEANING 0 0 0 0 0 0 0 0
RBL 4 SERVICE Roots Ball Lateral HEAVY

CLEANING
HEAVY
CLEANING 0 0 0 0 0 0 0 0
RF 0 SERVICE Roots Fine 0 0 0 0 0 0 0 0
RFB 2 SERVICE Roots Fine Barrel CLEANING CLEANING 0 0 0 0 0 0 0 0 RFC 1 SERVICE Roots Fine Connection CLEANING CLEANING 0 0 0 0 0 0 0 0 RFJ 1 SERVICE Roots Fine Joint CLEANING CLEANING 0 0 0 0 0 0 0 0 RFL 1 SERVICE Roots Fine Lateral CLEANING CLEANING 0 0 0 0 0 0 0 0 RH 0 SERVICE Roots Heavy HEAVY

CLEANING
HEAVY
CLEANING 0 0 0 0 0 0 0 0
RMB 4 SERVICE Roots Medium Barrel CLEANING CLEANING 0 0 0 0 0 0 0 0 RMC 3 SERVICE Roots Medium
Connection CLEANING CLEANING 0 0 0 0 0 0 0 0
RMJ 3 SERVICE Roots Medium Joint CLEANING CLEANING 0 0 0 0 0 0 0 0 999
Item # 16.

Defect
Code
Default
Score Type Description Rehab. Method Alternative Method Comments Clock
Pos.

Grade1
Clock
Pos.

Grade2
Clock
Pos.

Grade3
Clock
Pos.

Grade4
Value %
Grade1
Value %
Grade2
Value %
Grade3
Value %
Grade4
Alter.

Rehab.

Cutoff
RML 3 SERVICE Roots Medium Lateral CLEANING CLEANING 0 0 0 0 0 0 0 0 RPL 0 STRUCTURAL Point Repair Liner 0 0 0 0 0 0 0 0
RPLD 4 STRUCTURAL Point Repaie Liner
Defective POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
RPP 0 STRUCTURAL Point Repair Patch 0 0 0 0 0 0 0 0
RPPD 4 STRUCTURAL Point Repair Patch
Patch Defective POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 RPR 0 STRUCTURAL Point Repair
Replacement 0 0 0 0 0 0 0 0
RPRD 4 STRUCTURAL
Point Repair
Replacement
Defective
POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
RPZ 0 STRUCTURAL Point Repair Other 0 0 0 0 0 0 0 0
RPZD 0 STRUCTURAL Point Repair Other
Defective POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
RTB 3 SERVICE Roots Tap Barrel CLEANING CLEANING 0 0 0 0 0 0 0 0 RTC 2 SERVICE Roots Tap Connection CLEANING CLEANING 0 0 0 0 0 0 0 0 RTJ 2 SERVICE Roots Tap Joint CLEANING CLEANING 0 0 0 0 0 0 0 0 RTL 2 SERVICE Roots Tap Lateral CLEANING CLEANING 0 0 0 0 0 0 0 0 SA 0 MISCELLANEOUS Survey Abandoned 0 0 0 0 0 0 0 0
SAM 4 STRUCTURAL Surface Damage
Aggregate Missing LINING LINING 0 0 0 0 0 0 0 0
SAMC 4 STRUCTURAL Surface Aggregate
Missing Chemic LINING LINING 0 0 0 0 0 0 0 0
SAMM 4 STRUCTURAL Surface Aggregate
Missing Mechan LINING LINING 0 0 0 0 0 0 0 0
SAMZ 4 STRUCTURAL Surface Aggregate
Missing Unknow LINING LINING 0 0 0 0 0 0 0 0
SAP 3 STRUCTURAL Surface Damage
Aggregate Projecting LINING LINING 0 0 0 0 0 0 0 0
SAPC 3 STRUCTURAL Surface Aggregate
Projecting Che LINING LINING 0 0 0 0 0 0 0 0
SAPM 3 STRUCTURAL Surface Aggregate
Projecting Mec LINING LINING 0 0 0 0 0 0 0 0
SAPZ 3 STRUCTURAL Surface Aggregate
Projecting Unk LINING LINING 0 0 0 0 0 0 0 0
SAV 2 STRUCTURAL Surface Damage
Aggregate Visible LINING LINING 0 0 0 0 0 0 0 0
SAVC 3 STRUCTURAL Surface Aggregate
Visible Chemic LINING LINING 0 0 0 0 0 0 0 0
SAVM 3 STRUCTURAL Surface Aggregate
Visible Mechan LINING LINING 0 0 0 0 0 0 0 0
1000
Item # 16.

Defect
Code
Default
Score Type Description Rehab. Method Alternative Method Comments Clock
Pos.

Grade1
Clock
Pos.

Grade2
Clock
Pos.

Grade3
Clock
Pos.

Grade4
Value %
Grade1
Value %
Grade2
Value %
Grade3
Value %
Grade4
Alter.

Rehab.

Cutoff
SAVZ 3 STRUCTURAL Surface Aggregate
Visible Unknow LINING LINING 0 0 0 0 0 0 0 0
SCP 3 STRUCTURAL Surface Corrosion
Metal Pipe LINING LINING 0 0 0 0 0 0 0 0
SG 0 SERVICE Line Sags POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 SMW 5 STRUCTURAL Surface Damage
Missing Wall POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
SMWC 5 STRUCTURAL Surface Missing Wall
Chemical POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
SMWM 5 STRUCTURAL Surface Missing Wall
Mechanical POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
SMWZ 5 STRUCTURAL Surface Missing Wall
Unknown POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
SRC 5 STRUCTURAL
Surface Damage
Reinforcement
Cement
POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
SRCC 5 STRUCTURAL
Surface
Reinforcement
Corroded C
POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
SRCM 5 STRUCTURAL
Surface
Reinforcement
Corroded M
POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
SRCZ 5 STRUCTURAL
Surface
Reinforcement
Corroded U
POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
SRI 1 MISCELLANEOUS Surface Roughness
Increased 0 0 0 0 0 0 0 0
SRIC 1 STRUCTURAL Surface Roughness
Increased Chem LINING LINING 0 0 0 0 0 0 0 0
SRIM 1 STRUCTURAL Surface Roughness
Increased Mech LINING LINING 0 0 0 0 0 0 0 0
SRIZ 1 STRUCTURAL Surface Roughness
Increased Unkn LINING LINING 0 0 0 0 0 0 0 0
SRP 5 STRUCTURAL
Surface
Reinforcement
Projecting
LINING LINING 0 0 0 0 0 0 0 0
SRPC 3 STRUCTURAL
Surface
Reinforcement
Projecting
LINING LINING 0 0 0 0 0 0 0 0
SRPM 3 MISCELLANEOUS
Surface
Reinforcement
Projecting
LINING LINING 0 0 0 0 0 0 0 0
1001
Item # 16.

Defect
Code
Default
Score Type Description Rehab. Method Alternative Method Comments Clock
Pos.

Grade1
Clock
Pos.

Grade2
Clock
Pos.

Grade3
Clock
Pos.

Grade4
Value %
Grade1
Value %
Grade2
Value %
Grade3
Value %
Grade4
Alter.

Rehab.

Cutoff
SRPZ 3 STRUCTURAL
Surface
Reinforcement
Projecting
LINING LINING 0 0 0 0 0 0 0 0
SRV 4 STRUCTURAL Surface Damage
Reinforcement Visible LINING LINING 0 0 0 0 0 0 0 0
SRVC 5 MISCELLANEOUS
Surface
Reinforcement Visible
Ch
LINING LINING 0 0 0 0 0 0 0 0
SRVM 5 STRUCTURAL
Surface
Reinforcement Visible
Me
LINING LINING 0 0 0 0 0 0 0 0
SRVZ 5 STRUCTURAL
Surface
Reinforcement Visible
Un
LINING LINING 0 0 0 0 0 0 0 0
SSC 1 MISCELLANEOUS Surface Spilling of
Damage Coating 0 0 0 0 0 0 0 0
SSS 2 STRUCTURAL Surface Damage
Surface Spalling LINING LINING 0 0 0 0 0 0 0 0
SSSC 2 STRUCTURAL Surface Spalling
Chemical LINING LINING 0 0 0 0 0 0 0 0
SSSM 2 STRUCTURAL Surface Spalling
Mechanical LINING LINING 0 0 0 0 0 0 0 0
SSSZ 2 MISCELLANEOUS Surface Spalling Other LINING LINING 0 0 0 0 0 0 0 0 SZ 0 STRUCTURAL Surface Damage
Other LINING LINING 0 0 0 0 0 0 0 0
SZC 0 STRUCTURAL Surface Other
Chemical LINING LINING 0 0 0 0 0 0 0 0
SZM 0 STRUCTURAL Surface Other
Mechanical LINING LINING 0 0 0 0 0 0 0 0
SZZ 0 STRUCTURAL Surface Other
Unknown LINING LINING 0 0 0 0 0 0 0 0
TB 0 CONSTRUCTION Tap Break-in 0 0 0 0 0 0 0 0
TBA 0 CONSTRUCTION Tap Break-in Active 0 0 0 0 0 0 0 0
TBB 0 CONSTRUCTION Tap Break-in
Abandoned 0 0 0 0 0 0 0 0
TBC 2 CONSTRUCTION Tap Break-in Capped 0 0 0 0 0 0 0 0
TBD 3 CONSTRUCTION Tap Break-in
Defective POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0
TBI 0 CONSTRUCTION Tap Break-in Intruding POINT REPAIR POINT REPAIR 0 0 0 0 0 10 20 30 TF 0 CONSTRUCTION Tap Factory 0 0 0 0 0 0 0 0
1002
Item # 16.

Defect
Code
Default
Score Type Description Rehab. Method Alternative Method Comments Clock
Pos.

Grade1
Clock
Pos.

Grade2
Clock
Pos.

Grade3
Clock
Pos.

Grade4
Value %
Grade1
Value %
Grade2
Value %
Grade3
Value %
Grade4
Alter.

Rehab.

Cutoff
TFA 0 CONSTRUCTION Tap Factory Activity 0 0 0 0 0 0 0 0 TFB 0 CONSTRUCTION Tap Factory
Abandoned 0 0 0 0 0 0 0 0
TFC 0 CONSTRUCTION Tap Factory Capped 0 0 0 0 0 0 0 0
TFD 2 CONSTRUCTION Tap Factory Defective 0 0 0 0 0 0 0 0 TFI 0 CONSTRUCTION Tap Factory Intruding 0 0 0 0 0 10 20 30 TR 0 CONSTRUCTION Tap Rehabilitated 0 0 0 0 0 0 0 0
TRA 0 MISCELLANEOUS Tap Rehabilitated
Activity 0 0 0 0 0 0 0 0
TRB 0 MISCELLANEOUS Tap Rehabilitated
Abandoned 0 0 0 0 0 0 0 0
TRC 0 MISCELLANEOUS Tap Rehabilitated
Capped 0 0 0 0 0 0 0 0
TRD 2 CONSTRUCTION Tap Rehabilitated
Defective 0 0 0 0 0 0 0 0
TRI 0 CONSTRUCTION Tap Rehabilitated
Intruding 0 0 0 0 0 10 20 30
TS 0 CONSTRUCTION Tap Saddle 0 0 0 0 0 0 0 0
TSA 0 CONSTRUCTION Tap Saddle Activity 0 0 0 0 0 0 0 0
TSB 0 CONSTRUCTION Tap Saddle
Abandoned 0 0 0 0 0 0 0 0
TSC 0 CONSTRUCTION Tap Saddle Capped 0 0 0 0 0 0 0 0
TSD 2 CONSTRUCTION Tap Saddle Defective 0 0 0 0 0 0 0 0 TSI 0 CONSTRUCTION Tap Saddle Intruding POINT REPAIR POINT REPAIR 0 0 0 0 0 10 20 30 VC 1 SERVICE Vermin Cockroach 0 0 0 0 0 0 0 0
VR 2 SERVICE Vermin Rat 0 0 0 0 0 0 0 0
VZ 1 SERVICE Vermin Other 0 0 0 0 0 0 0 0
WFC 2 STRUCTURAL Weld Feature
Circumferential LINING LINING 0 0 0 0 0 0 0 0
WFL 2 STRUCTURAL Weld Feature
Longitudinal LINING LINING 0 0 0 0 0 0 0 0
WFM 3 STRUCTURAL Weld Feature Multiple LINING LINING 0 0 0 0 0 0 0 0 WFS 2 STRUCTURAL Weld Feature Spiral LINING LINING 0 0 0 0 0 0 0 0 WFZ 0 STRUCTURAL Weld Feature Other LINING LINING 0 0 0 0 0 0 0 0 WL 0 MISCELLANEOUS Water Level 0 0 0 0 0 0 0 0
X 0 STRUCTURAL Collapse POINT REPAIR POINT REPAIR 5 0 0 0 0 0 0 0 1003
Item # 16.

Defect
Code
Default
Score Type Description Rehab. Method Alternative Method Comments Clock
Pos.

Grade1
Clock
Pos.

Grade2
Clock
Pos.

Grade3
Clock
Pos.

Grade4
Value %
Grade1
Value %
Grade2
Value %
Grade3
Value %
Grade4
Alter.

Rehab.

Cutoff
XB 5 STRUCTURAL Collapse Brick Sewer POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 XP 5 STRUCTURAL Collapse Pipe Sewer POINT REPAIR POINT REPAIR 0 0 0 0 0 0 0 0 1004
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
Appendix I: GIS Updates
See section below and see 2 GIS shapefiles attached related to the Appendix I subsection “GIS fixes” • Appx I_duplicate_pipes.zip
• Appx I_before_rehab_adjustments.zip.
1005
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
Appendix I
GIS Updates
GIS Data Received
A copy of the City GIS was provided in the Fall of 2019. There are 17,880 assets where 3240 are sewer pipes and 14,640 are laterals. On June 17, 2020, HSE provided GIS updates with revisions to drawing number, shape length, elevations, material, year, abandoned tag, diameter, private ownership tag, and added GIS segments.

GIS Updates
In the process of the desktop condition assessment task and renewal and replacement plan, two updated GIS shapefiles were created – risk GIS (Appendix F) and rehabilitation GIS (Appendix A). To both updates GIS shapefiles, the City GIS was updated based upon results of the CCTV and modeling efforts. It was then joined with CCTV inspection score data, rough pavement presence was determined, and depth was calculated by subtracting pipe inverts from known manhole rim elevations. Then, this was joined with risk updates (first shapefile) or rehabilitation updates (second shapefile).

Risk GIS
The first GIS shapefile involves the risk updates (desktop condition assessment). The attribute table provides the risk scores (normalized from 1-5, normalized from 1-100, and total mathematical score) as well as LOF COF scores and their constituents. Each LOF and COF factor has their own column where the number shown is the rating multiplied by the weighting described earlier in this report.

Rehabilitation GIS
The second GIS shapefile involves renewal and replacement fields. Important fields added to the City GIS in this version includes rehabilitation recommendation for each asset, number of rehabilitations (point repair(s), section liner(s), full lining), and flow chart branch (the decision tree path that led to the recommendation). The “total cost” column was the default name by InfoAsset and factors in traffic control and a 45% markup for sewer bypassing, mobilization/demobilization, and construction cost and market contingency.

However, the cost does not include planning costs such as engineering, permitting, legal, administrative, or other items as stated in summary tables throughout the report.

GIS Fixes
Some minor post rehabilitation analysis fixes had to be made. These edited pipes were exported as shapefiles and provided as attachments in this appendix - (duplicate pipes.zip and before rehabilitation adjustments.zip). The first issue involved duplicate GIS pipes. These were reviewed and removed. Facility IDs with more than 1 pipe were exported into the “Appx I_duplicate pipes.zip”. The second issue involved the choice of “Facility ID” as the unique identifier for CCTV surveys. Upon further review, this identifier is not unique for around 50 of the 3240 pipes with Facility ID. For around 50 pipes, 2 to 4 pipes had identical facility ID but spatially different GIS segments along the same path. As a result, a rehabilitation cost was attributed to the first of many pipes with the same facility ID and the other pipes of different lengths was then assigned the exact same rehabilitation, rehabilitation length, and associated cost. For example, the 2 pipe GIS segments with Facility ID “10160-10164” were each assigned a “Full CIPP” rehabilitation recommendation with a cost of $36,000 of each with the rehab length assumption of 393 feet. However, one of the GIS segments had a pipe length of 10 feet. This resulted in a vastly greater cost than it should have. In addition, the number of 1006
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
rehabilitation items was attributed to each GIS segment. Other identifiers were searched in the attribute table, but ultimately because this identifier was used for the CCTV surveys, this is the identifier we had to stick with. Resolution: for these 50 pipes, BC edited this GIS version to fix the planning cost and properly assign the number of rehab and rehab length. These 50 pipes were exported into “Appx I_before_rehab_adjustments.zip”. In future GIS updates, City staff should consider generating a new and unique facility ID field.
1007
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
Appendix J: Basis of Cost Estimate Details
1008
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
1 Appendix J: Basis of Cost Assumptions
J.1 Basis of cost assumptions
This section describes the cost basis for rehabilitation items. Items related to quotes from manufacturers only include material and installation costs. These do not include labor or agency costs used for master planning such as administrative, permitting, or other costs. For pipes with unknown diameters, the average pipe diameter of nine inches was used for costing. For pipes with unknown depths, the average pipe depth of 11 feet was assumed.

J.1.1 CCTV Costs
Table J-1 presents CCTV costs used in the analysis.

Table J-1. CCTV Cost By Pipe Diameter
Pipe Diameter (inch)1, 2 Cost ($/LF)
Up to 18 4
19 to 24 5
25 to 36 6
37 to 662 8
1CCTV bids are from City of Bloomington FY 2017 CCTV Inspections PROJECT NO. # 50-18-53007-17-00. CITY BID NO. 2017-16. The costs shown here are an average of the bids from Michels Pipe Services, National Power Rodding Corp., and Bloomington City engineer estimate. G.A. Rich & Sons, Inc. was excluded due to low bids.
2CCTV cost for pipe diameters between 37-inch and 66-inch was extrapolated.
1009
Item # 16.

Tech Memo Subject
2 J.1.2 Pipe Replacement
Table J-2 and J-3 presents pipe replacement costs for pipes located under pavement and not under pavement, respectively. The cost shown on the tables below reflect pipe material, installation, backfill, and excavation costs. Since GIS data did not provide pavement information, the presence of pavement was determined by the “select by location” and intersecting pipes with the USGS transportation and road segments layer. Of 3254 pipes, 90% of the pipes (2937 pipes) were under pavement.

Table J-2. Pipe Replacement, Pavement Present
Pipe Diameter
(inch)1
Cost ($/LF)
0-8 Feet
Below Grade
8-12 Feet
Below Grade
12-16 Feet
Below Grade
Over 16 Feet
Below Grade
6 $195 $210 $225 $260
8 $265 $280 $295 $330
10 $335 $350 $365 $400
12 $405 $420 $435 $475
15 $505 $525 $545 $585
18 $610 $630 $650 $695
21 $715 $735 $755 $805
24 $815 $840 $865 $915
27 $920 $945 $970 $1,025
30 $1,025 $1,050 $1,075 $1,130
33 $1,125 $1,155 $1,185 $1,245
36 $1,230 $1,260 $1,290 $1,350
39 $1,330 $1,365 $1,400 $1,465
42 $1,435 $1,470 $1,505 $1,575
48 $1,645 $1,680 $1,715 $1,790
54 $1,850 $1,890 $1,930 $2,010
66 $2,265 $2,310 $2,355 $2,450
1Pipe material costs are provided by 2020 quotes from Northern Pipe (RCP Pipe) and Mission Clay Products (VCP Pipe)
2Backfill, Excavation, and pavement are provided by RSMeans construction cost database 1010
Item # 16.

Tech Memo Subject
3 Table J-3. Pipe Replacement, No Pavement
Pipe Diameter
(inch) (1)
Cost ($/LF)
0-8 Feet
Below Grade
8-12 Feet
Below Grade
12-16 Feet
Below Grade
Over 16 Feet
Below Grade
6 $165 $180 $195 $230
8 $225 $240 $255 $290
10 $285 $300 $315 $350
12 $345 $360 $375 $415
15 $430 $450 $470 $510
18 $520 $540 $560 $605
21 $610 $630 $650 $700
24 $695 $720 $745 $795
27 $785 $810 $835 $890
30 $875 $900 $925 $980
33 $960 $990 $1,020 $1,080
36 $1,050 $1,080 $1,110 $1,170
39 $1,135 $1,170 $1,205 $1,270
42 $1,225 $1,260 $1,295 $1,365
48 $1,405 $1,440 $1,475 $1,550
54 $1,580 $1,620 $1,660 $1,740
66 $1,935 $1,980 $2,025 $2,120
1Pipe material costs are provided by 2020 quotes from Northern Pipe (RCP Pipe) and Mission Clay Products (VCP Pipe)
2Backfill, Excavation, and pavement are provided by RSMeans construction cost database J.1.3 Point Repair(s) by Excavation
Table X-X and X-X presents point repair(s) by excavation costs used in the analysis. The costs presented are per point repair. A pipe assigned the rehabilitation recommendation “point repair(s)” or a combination of lining and “point repair(s)” may have more than one point repair. The excavation cost assumes 10 feet sections. The unit costs ($/LF) are taken from pipe replacement section and multiplied by 10. No additional multiplier was applied at the moment. This may result in a lower end of cost estimation. Typically, a point repair compared to a full pipe replacement will have a much greater unit cost due to similar equipment, machine rental, and labor costs.
1011
Item # 16.

Tech Memo Subject
4 Table J-4. Point Repair by Excavation, Pavement Present Pipe Diameter
(inch) (1)
Cost ($/LF)
0-8 Feet
Below Grade
8-12 Feet
Below Grade
12-16 Feet
Below Grade
Over 16 Feet
Below Grade
6 $600 $800 $1,000 $1,300
8 $700 $900 $1,000 $1,400
10 $800 $1,000 $1,200 $1,500
12 $900 $1,100 $1,300 $1,600
15 $1,100 $1,400 $1,600 $2,000
18 $1,400 $1,600 $1,800 $2,200
21 $1,700 $1,900 $2,200 $2,600
24 $2,000 $2,300 $2,500 $3,000
27 $2,400 $2,700 $2,900 $3,500
30 $2,700 $3,000 $3,300 $3,800
33 $3,500 $3,800 $4,100 $4,700
36 $3,700 $4,000 $4,300 $5,000
39 $3,400 $3,800 $4,100 $4,700
42 $3,900 $4,200 $4,600 $5,300
48 $5,000 $5,400 $5,700 $6,500
54 $6,200 $6,600 $7,000 $7,800
66 $8,600 $9,100 $9,600 $10,500
1Pipe material costs are provided by 2020 quotes from Northern Pipe (RCP Pipe) and Mission Clay Products (VCP Pipe)
2Backfill, Excavation, and pavement are provided by RSMeans construction cost database 1012
Item # 16.

Tech Memo Subject
5 Table J-5. Point Repair by Excavation, No Pavement
Pipe Diameter
(inch) (1)
Cost ($/LF)
0-8 Feet
Below Grade
8-12 Feet
Below Grade
12-16 Feet
Below Grade
Over 16 Feet
Below Grade
6 $400 $600 $800 $1,100
8 $400 $600 $800 $1,100
10 $500 $700 $900 $1,200
12 $600 $800 $900 $1,300
15 $800 $1,000 $1,200 $1,600
18 $900 $1,100 $1,300 $1,700
21 $1,100 $1,400 $1,600 $2,100
24 $1,300 $1,600 $1,800 $2,300
27 $1,600 $1,900 $2,100 $2,700
30 $1,800 $2,000 $2,300 $2,900
33 $2,400 $2,700 $3,000 $3,600
36 $2,400 $2,700 $3,000 $3,600
39 $1,900 $2,200 $2,500 $3,200
42 $2,100 $2,400 $2,800 $3,400
48 $2,800 $3,100 $3,500 $4,300
54 $3,400 $3,800 $4,200 $5,000
66 $4,800 $5,200 $5,700 $6,600
1Pipe material costs are provided by 2020 quotes from Northern Pipe (RCP Pipe) and Mission Clay Products (VCP Pipe)
2Backfill, Excavation, and pavement are provided by RSMeans construction cost database 1013
Item # 16.

Tech Memo Subject
6 J.1.4 Sectional Liner(s)
Table J-6 presents sectional liner(s) costs used in the analysis.

Table J-6. Sectional Lining Costs
Pipe Diameter (inch) (1) Cost ($/LF)
62 3,000
8 3,000
102 4,500
122 6,000
152 7,500
182 7,500
212 9,000
242 9,000
272 10,500
302 10,500
332 12,000
362 12,000
392 13,500
422 13,500
482 13,500
542 13,500
662 15,000
1Prices from Virginia Beach Annual Services Construction Contract #17 bid tab 2Medium to large diameter sectional lining based on extrapolation. 1014
Item # 16.

Tech Memo Subject
7 J.1.5 Full Pipe Length Cured in Place Pipe (Full CIPP) Table J-7 presents full CIPP costs used in the analysis.

Table J-7. Full CIPP Costs
Pipe Diameter (inch) (1) Cost ($/LF)
6 96
8 128
10 160
12 192
15 240
18 288
21 336
24 384
27 432
30 480
33 528
36 576
39 624
42 672
48 768
54 864
66 1056
1Based on evaluations of North Davis Sewer District Bid Tabs, Project 3 through Project 7, escalated to 2020 dollars
Costs do not include bypass pumping or traffic control. Unit Diameter Costs are based on 200 ft lateral spacing and
2000 ft project length
2Larger diameter (36-inch to 66-inch) full CIPP based on Salt Lake City BODR 1015
Item # 16.

Sewer Utility Asset Renewal and Replacement Study
Appendix K: Main and Venus Way Lift Station Inspections Draft Report, May 2020
1016
Item # 16.

Main and Venus Way Lift
Station Inspections Report
Prepared for
City of Milpitas – Sewer Master Plan
Milpitas, CA
May 14, 2020
1017
Item # 16.
1018
Item # 16.
201 North Civic Dr, Suite 300
Walnut Creek, CA 94596
Main and Venus Way Lift Station
Inspections Report
Prepared for
City of Milpitas – Sewer Master Plan
Milpitas, California
May 14, 2020
This is a draft and is not intended to be a final representation of the work done or recommendations made by Brown and Caldwell.

It should not be relied upon; consult the final report . 1019
Item # 16.
ii
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx 1020
Item # 16.
iii
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Table of Contents
List of Figures.............................................................................................................................................. iv List of Tables ............................................................................................................................................... iv List of Abbreviations .................................................................................................................................... v

1. Introduction .......................................................................................................................................1-1

2. System Information and Data ..........................................................................................................2-1

2.1 Existing Reports and Information ..........................................................................................2-1

2.2 Asset Inventory for Inspections..............................................................................................2-2

3. Main Lift Station Inspections............................................................................................................3-1

3.1 Assets ......................................................................................................................................3-1

3.2 Condition Data ........................................................................................................................3-4

4. Venus Way Lift Station Inspections..................................................................................................4-1

4.1 Assets ......................................................................................................................................4-1

4.2 Condition Data ........................................................................................................................4-2

5. Limitations .........................................................................................................................................5-1 Appendix A: Main Lift Station – Mechanical............................................................................................A-1 Appendix B: Main Lift Station – Electrical .............................................................................................. B-1 Appendix C: Main Lift Station – Instrumentation....................................................................................C-1 Appendix D: Main Lift Station – Civil....................................................................................................... D-1 Appendix E: Main Lift Station – Structural ..............................................................................................E-1 Appendix F: Venus Way Lift Station – Mechanical..................................................................................F-1 Appendix G: Venus Way Lift Station – Electrical .................................................................................... G-1 Appendix H: Venus Way Lift Station – Instrumentation......................................................................... H-1 Appendix I: Venus Way Lift Station – Civil ................................................................................................I-1 Appendix J: Venus Way Lift Station – Structural..................................................................................... J-1 1021
Item # 16.

Table of Contents
City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
iv
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx List of Figures
Figure 1. Facility Locations Map ..............................................................................................................1-1 List of Tables
Table 2-1. Lift Station Existing Reports and Information ......................................................................2-1 Table 2-2. Asset Types for Inspections...................................................................................................2-2 Table 2-3. Assets Not Included in the Inventory for Inspections ..........................................................2-3 Table 3-1. Mechanical Assets ..................................................................................................................3-1 Table 3-2. Electrical Assets ......................................................................................................................3-3 Table 3-3. Instrumentation Assets...........................................................................................................3-4 Table 3-4. Civil Assets...............................................................................................................................3-4 Table 3-5. Structural Assets .....................................................................................................................3-4 Table 3-6. Mechanical Condition Data ....................................................................................................3-5 Table 3-7. Electrical Condition Data ........................................................................................................3-7 Table 3-8. Instrumentation Condition Data.............................................................................................3-8 Table 3-9. Civil Condition Data.................................................................................................................3-9 Table 3-10. Structural Condition Data.....................................................................................................3-9 Table 4-1. Mechanical Assets ..................................................................................................................4-1 Table 4-2. Electrical Assets ......................................................................................................................4-1 Table 4-3. Instrumentation Assets...........................................................................................................4-1 Table 4-4. Civil Assets...............................................................................................................................4-1 Table 4-5. Structural Assets .....................................................................................................................4-2 Table 4-6. Mechanical Condition Data ....................................................................................................4-3 Table 4-7. Electrical Condition Data ........................................................................................................4-3 Table 4-8. Instrumentation Condition Data.............................................................................................4-3 Table 4-9. Civil Condition Data.................................................................................................................4-4 Table 4-10. Structural Condition Data.....................................................................................................4-4 1022
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report Table of Contents v
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx List of Abbreviations
A ampere (amp)
AIC ampere interrupting capacity
ARV air release valve
ATS automatic transfer switch
BFV butterfly valve
CAV combination air valve
FM force main
kV kilovolt
kVA kilovolt-ampere
HP horsepower
LCP local control panel
MAS multi-agent system
MCC motor control center
NEMA National Electrical Manufacturers Association
PG&E Pacific Gas & Electric
ph phase
PLC programmable logic controller
PV plug valve
PVC polyvinyl chloride
SME subject matter expert
SS stainless steel
SSMH sanitary sewer manhole
V volt
VFD variable frequency drive
W watt
1023
Item # 16.
1024
Item # 16.
1-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Section 1
Introduction
City of Milpitas (City) and HydroScience Engineers, Inc. (HydroScience) entered into an agreement dated October 18, 2019 for professional services for the following project: City of Milpitas – Sewer Master Plan (Project). Brown and Caldwell is performing work on the Project as a subconsultant to HydroScience. The purpose of this report is to document the visual investigations performed by Brown and Caldwell at two sewer facilities, Main Lift Station and Venus Way Lift Station, as part of the Project scope of work, Task 2. Data Collection/Preliminary Research/System Review/ Field Inspection. The facility locations are shown on Figure 1.

Figure 1. Facility Locations Map
The inspection information in this report is organized in the following sections:

Section 2 - System Information and Data
Section 3 – Main Lift Station Inspections
Section 4 – Venus Way Lift Station Inspections
Appendix A through Appendix F – Main Lift Station Inspection Records Appendix G through Appendix K – Venus Way Lift Station Inspections Main Lift Station
Venus Way Lift Station
1025
Item # 16.
1026
Item # 16.
2-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Section 2
System Information and Data
Review of the available system information and data, and the selection of the asset inventory to be used to perform field inspections are summarized in this section.

2.1 Existing Reports and Information
Existing reports and information provided by the City and reviewed for the Main Lift Station and Venus Way Lift Station are included in Table 2-1.

Table 2-1. Lift Station Existing Reports and Information Document Title Type
Project
Number
Drawing
Reference Pages Description/Notes Date(s)
Main and Venus Lift Stations
Sewer Inventory Master Spreadsheet _
Main Lift Station
Main Sewage Pump Station
Improvements Project
Project No. 6103
Record
Drawing
6103 2-1066 95 Prepared by Winzler & Kelly
Consulting Engineers
Nov 2008
Letter
Anthony Petroccitto, Winzler & Kelly to
Tom Yousch, City of Milpitas
Subject: Milpitas Main Sewage Pump
Station Capacity – Existing Station and
New Station Under Construction
Letter 6103 3 New pump station capacity
including system head curves
Undated,
2008
Project No. 6078
Plans for the Construction of
Parallel Force Main Project
2000
Record
Drawing
6078 2-1031 32 Prepared by Kennedy/Jenks
Consultants
Sheets 18-19 revised May 2020
Sheet 30 revised June 2004
Oct 2002
Jun 2004
May 2020
Main Sewage Pump Station
Improvements Project
November 1997
Project No. 6071
Volume 4 - Contract Drawings
Record
Drawing
6071 2-986 32 Prepared by Carollo Engineers
Final revision per owner
comments
Apr 2001
Venus Way Lift Station
Venus Pump Station Improvement
Project No. 6101
Project Drawings
June 2008
As-Built
Drawing
6101 2-1107 21 Prepared by Dodson Psomas Feb 2009
Approved Submittal 01a from Anderson
Pacific Engineering Construction, Inc.

Project No. 6101
Section 11130, Submersible Pumps
Submittal 6101 25 Flygt pumps, motors,
accessories
Sep 2008
1027
Item # 16.

Section 2
City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
2-2
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx

2.2 Asset Inventory for Inspections
The existing reports and information for the lift stations were reviewed by a team of subject matter experts (SMEs) covering the following disciplines:
• Mechanical
• Electrical
• Instrumentation
• Civil
• Structural
The SMEs identified the assets to be inspected, and the assets were entered into Fulcrum for field inspection data collection and condition assessment by asset. The asset types used for the inspections are included in Table 2-2. Specific assets are discussed in Section 3 for the Main Lift Station and Section 4 for the Venus Way Lift Station.

Table 2-2. Asset Types for Inspections
Mechanical Asset Type Electrical Asset Type Instrumentation Asset Type Structure Asset Type Actuator Battery Flow Transmitter Basin
Air Compressor Battery Bank Level Switch Building
Controller Building Panel Clarifier
Crane Buss Duct Remote Telemetry Unit Crane
Discharge Pipes Circuit Breaker Radio (Transceiver) Tank Fan Generator Tank Cover
Fish Screen Rake Motor Roof
Flow Meter Motor Control Center Slab
Gate Bulkhead Motor Starter Vault
Slide Panel
Sluice PLC
N/A Protective Relay
Grinder Rectifier
Pig Launcher Switch
Piping Switchgear
Pump Transformer
Screens Uninterruptable Power Supply
Stoplog Variable Freq Drive
Tank
Valve ARV/CAV
Butterfly
Check
Diaphragm
Gate
Pinch
Plug
1028
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report Section 2 2-3
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Assets that were reviewed but not included in the final asset inventory for inspections, and the reasons, are included in Table 2-3. All of these assets were identified from information found in the Sewer Inventory Master spreadsheet.

Table 2-3. Assets Not Included in the Inventory for Inspections Asset Names/Types Reason Not Included Asset Types
Project/
Drawing
Reference
Year of
Construction
Main Lift Station
Pump #1 and Pump #6 pumps, piping,
valves
Future per Sewer Inventory Master.

Base assembly, piping, and rail system
installed under Project 6103/2-1066
Drawing Number M-101
Pump
Piping
Valves
Grinders #5, #6, #7, #8 Future per Sewer Inventory Master Grinder Venus Way Lift Station
8” Bypass Line Unknown1 Piping 6101/2-1107 2008
Seal holes in slab, valve vault Assess with valve vault 6101/2-1107 2008 Vertical Pipe Supports Assess under Miscellaneous 6101/2-1107 2008 Pumps, electrical, valves, vaults, piping,
vents
Replaced in/updated with Project 6101 Various 6064/2-849 1994 Cathodic protection, bubbler piping,
electricalservice
Replaced in/updated with Project 6101 Various 6040/2-660 1984 Piping, valves, covers, manholes,
electroliers, luminaires, electrical, fire
hydrants and valves
Replaced in/updated with Project 6101 Various 2-161 1965 Existing SSMH 1-2 and 15” Gravity Sewer Different asset class On Sheet C-1 of Project 6101 (2-1107)
Gravity Sewer 1965
Dry Well Replaced in/updated with Project 6101 Tank 1964 Other
Force Main A, venturi meter and vault Force main, not lift station asset Force main, flow meter and vault
2-343 1975
Butterfly Valve Force main, not lift station asset Valve and vault 2-986 1997 1 Piping in Venus Way station was all in good condition 1029
Item # 16.
1030
Item # 16.
3-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Section 3
Main Lift Station Inspections

3.1 Assets
The assets for Main Lift Station inspections are included in Table 3-1 (Mechanical), Table 3-2 (Electrical), Table 3-3 (Instrumentation), Table 3-4 (Civil), and Table 3-5 (Structural).

Table 3-1. Mechanical Assets
Asset Name Asset Description Asset ID Asset Type Year Installed Pig Launcher A 36" Pig Launcher PIG-A Pig Launcher 2002 Pig Launcher B 36" Pig Launcher PIG-B Pig Launcher 2002 Pinch Valve 1 36'' Pinch Valve (1 of 3) Valve 2002
Pinch Valve 2 36'' Pinch Valve (2 of 3) Valve 2002
Pinch Valve 3 36'' Pinch Valve (3 of 3) Valve 2002
Mag Meter (flow meter A) 24'' Magnetic Meter Flow Meter 2002 Venturi Meter- Removed in 2008 36'' Venturi Meter (taken out) Flow Meter 1975 Butterfly Valve 36'' Butterfly Valve, FM interconnect Valve 1970 Manifold Piping 36-inch flanged coupling adapter. 36-inch ductile iron 45' MJ x MJ bend. 20-inch or 36-
inch FLxPE spool through sleeve with link
seal. 36'' x 20'' x 36'' ductile iron tee (force
main A)
Piping 2008
Manifold Piping Butterfly Valve 36-inch diameter BFV, middle of manifold Valve 2008 Manifold Piping Plug Valve #1 36-inch diameter PV, pumps 1, 2, 3 Valve 2008 Manifold PV #1 Actuator plug valve #1 electric actuator Actuator 2008 Manifold Piping Plug Valve #2 36-inch diameter PV, pumps 4, 5, 6 Valve 2008 Manifold PV #2 Actuator plug valve #2 electric actuator Actuator 2008 Pump #2 FLYGT CP3531-775, 170HP Submersible
Pump
Pump 2008
Pump #2 Piping 20-Inch Ductile Iron Vertical Discharge Pipe, 20-Inch Ductile Iron 90 Elbow, 20-Inch
Flanged Coupling Adapter
Piping 2008
Pump #2 Check Valve 20-Inch Diameter Spring Loaded Check Valve Valve 2008 Pump #2 Plug Valve 20-Inch Diameter Plug Valve Valve 2008 Pump #3 FLYGT CP3531-775, 170HP Submersible
Pump
Pump 2008
Pump #3 Piping 20-Inch Ductile Iron Vertical Discharge Pipe, 20-Inch Ductile Iron 90 Elbow, 20-Inch
Flanged Coupling Adapter
Piping 2008
Pump #3 Check Valve 20-Inch Diameter Spring Loaded Check Valve Valve 2008 1031
Item # 16.

Section 3
City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
3-2
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Table 3-1. Mechanical Assets
Asset Name Asset Description Asset ID Asset Type Year Installed Pump #3 Plug Valve 20-Inch Diameter Plug Valve Valve 2008 Pump #4 FLYGT CP3531-775, 170HP Submersible
Pump
Pump 2008
Pump #4 Piping 20-Inch Ductile Iron Vertical Discharge Pipe, 20-Inch Ductile Iron 90 Elbow, 20-Inch
Flanged Coupling Adapter
Piping 2008
Pump #4 Check Valve 20-Inch Diameter Spring Loaded Check Valve Valve 2008 Pump #4 Plug Valve 20-Inch Diameter Plug Valve Valve 2008 Pump #5 (not installed yet) FLYGT CP3531-775, 170HP Submersible Pump
Pump
Pump #5 Piping 20-Inch Ductile Iron Vertical Discharge Pipe, 20-Inch Ductile Iron 90 Elbow, 20-Inch
Flanged Coupling Adapter
Piping 2008
Pump #5 Check Valve 20-Inch Diameter Spring Loaded Check Valve Valve 2008 Pump #5 Plug Valve 20-Inch Diameter Plug Valve Valve 2008 Main Head Gate 54-inch sluice gate with manual actuator Gate 2008 Head Gate #1 48-inch sluice gate with electric actuator Gate 2008 Head Gate #2 48-inch sluice gate with electric actuator Gate 2008 Head Gate #3 48-inch sluice gate with electric actuator Gate 2008 Head Gate #4 48-inch sluice gate with electric actuator Gate 2008 Grinder #1 5-hp electric driven Grinder 2008
Grinder #2 10-hp electric driven Grinder 2008
Grinder #3 10-hp electric driven Grinder 2008
Grinder #4 5-hp electric driven Grinder 2008
Air Supply Fan PS ventilation system Fan 2008
Exhaust Fan & Stack PS ventilation system Fan 2008
Miscellaneous Pipe support, 5' x 7' aluminum hatch, galv grating, 3'' SS guide rail, 4-inch diameter
PVC drain, pipe wall anchor bracket
2” combo air/vac valve
Force Main A B Flow Recorder
Eye wash
Flow Meter B This is for force main B
Air vac 1 to 15 All acrossthe pump station.
1032
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report Section 3 3-3
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Table 3-2. Electrical Assets
Asset Name Asset Description Asset ID Asset Type Year Installed Main Transformer 1000 kVA, 12 kV-480 V, 3-ph (PG&E) Transformer 2000 Outdoor Utility Disconnect and Metering
Panel
Outdoor NEMA 3R Enclosure Panel 2000
Main Switchgear Located in Existing Generator Building Switchgear 2000 Variable Frequency Drive P2 VFD for Pump 2 (170 HP) Variable Freq Drive 2008 Variable Frequency Drive P3 VFD for Pump 3 (170 HP) Variable Freq Drive 2008 Variable Frequency Drive P4 VFD for Pump 4 (170 HP) Variable Freq Drive 2008 Variable Frequency Drive P5 VFD for Pump 5 (170 HP) Variable Freq Drive 2008 Local Disconnect for Engine Jacket Water
Heater
30A/3P Switch 2000
Motor Control Center 2 600 A, 480 V, 3-ph, 3W, 65000 AIC MCC-2 Motor Control Center 2000 Motor Control Center 2A 600 A, 480 V, 3-ph, 3W, 65000 AIC MCC-2A Motor Control Center 2000 Dry Type Transformer 30 kVA, 480-208/120 V, Dry Type Transformer 2008 Lighting panel (LP-1) LA Panel 2008
Dry Type Transformer 30 kVA, 480-208/120 V, Dry Type Transformer 2000 Lighting panel (LA) 100 A, 1-Ph, 3 Wire LP-1 Panel 2000 Electrical/Generator Building-Electrical Building 2000
Motor Control Center A 400 A, 480 V, 3-ph, 3W, 65000 AIC MCC-A Motor Control Center 2008 Motor Control Center B 400 A, 480 V, 3-ph, 3W, 65000 AIC MCC-B Motor Control Center 2008 Dry Type Transformer 10 kVA, 480-240/120 V, Dry Type Transformer 2008 Distribution panel(DP-1) 125 A, NEMA Type 1 DP-1 Panel 2008 Dry Type Transformer 75 kVA, 480-208/120 V, Dry Type Transformer 2008 Distribution Panel (DP-2) 125 A, NEMA Type 1 DP-2 Panel 2008 Local Control Panel for Grinder#1 LCP grinder1 Panel 2008 Local Control Panel for Grinder#2 LCP grinder2 Panel 2008 Local Control Panel for Grinder#3 LCP grinder3 Panel 2008 Local Control Panel for Grinder#4 LCP grinder4 Panel 2008 Local Disconnect for CU-1 (for FC-1) 30A/3P Switch 2008 Local Disconnect for EF-1 (for Control
Room)
30A/3P Switch 2008
Local Disconnect for EF-5 (for wetwell) 60A/3P Switch 2008 Local Disconnect for SF-1 (for Wet Well) 60A/3P Switch 2008 Local Disconnect for HP-1 (for FC-2) 30A/3P Switch 2008 Local Disconnect for FC-1 (for Control
Room)
30A/3P Switch 2008
Generator 1000 kVA, 480 V Diesel Driven Engine
Generator
Generator 2000
Automatic Transfer Switch ATS, 1600 A Switch 2000
1033
Item # 16.

Section 3
City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
3-4
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Table 3-3. Instrumentation Assets
Asset Name Asset Description Asset ID Asset Type Year Installed MAS Enclosure and Pump Motor Monitor Panel MAS MAS 711 Panel 2008 Level Switch Level High High LSHH-201 Level Switch 2008 Level Switch Ultrasonic level LE-202 Level Switch 2008
Level Switch Ultrasonic level LE-203 Level Switch 2008
Generator and Fuel System Control Panel Local Control Panel Panel 2000 Table 3-4. Civil Assets
Asset Name Asset Description Asset Type Year Installed
Electrical building Building
Control building Building
Site civil Asphalt Pavement
Table 3-5. Structural Assets
Asset Name Asset Description Asset Type Year Installed
Pinch Valve Vault 1 Pinch Valve Vault (1 of 3) Vault 2002 Pinch Valve Vault 2 Pinch Valve Vault (2 of 3) Vault 2002 Pinch Valve Vault 3 Pinch Valve Vault (3 of 3) Vault 2002 Mag Meter Vault 24'' Magnetic Meter Vault Vault 2002
Venturi Meter Vault 36'' Venturi Meter Vault Vault 1975 Butterfly Valve Vault 36'' Butterfly Valve Vault Vault 1997 Electrical/Generator Building-Structural Building 2000
Fuel Tank (bulk) 2,000-gal UL-2085 above ground vault tank Tank 2008 Fuel Tank (day) Tank 2000
Control Building Building 2008
Grit Chamber/Inflow Structure Tank 2008
Wet Well Tank 2008
Garage Building 2008

3.2 Condition Data
Field inspections were completed on February 11, 2020 and March 11, 2020. The condition data and scores for Main Lift Station inspections are included in Table 3-6 (Mechanical), Table 3-7 (Electrical), Table 3-8 (Instrumentation), Table 3-9 (Civil), and Table 3-10 (Structural). Condition and performance scores for instrumentation, civil, and structure were 1 (no defects and asset functioning as intended) or 2 (minor defects, higher than expected O&M). Mechanical and electrical components received scores of 4 (major defects, function highly impaired) and mechanical components received scores of 5 (failing/failed, not functioning as intended), see Tables 3-6 and 3-7. 1034
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report Section 3 3-5
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Table 3-6. Mechanical Condition Data
Asset Name Field Assessment Comments Condition Score Performance Score Pig Launcher A None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Pig Launcher B None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Pinch Valve 1 NA - Not enough information available. NA - Not enough information available.

Pinch Valve 2 NA - Not enough information available. NA - Not enough information available.

Pinch Valve 3 NA - Not enough information available. NA - Not enough information available.

Mag Meter (flow meter A) Not in Operation 4 - Poor – Major defects observed. Asset integrity may be compromised.
4 - Poor – In service, but function is highly impaired.

Venturi Meter- Removed in 2008 NA - Not enough information available. NA - Not enough information available.

Butterfly Valve NA - Not enough information available. NA - Not enough information available.

Manifold Piping None 2 - Fair – Only minor defects observed. 2 - Fair – In service, but higher than expected O&M.

Manifold Piping Butterfly Valve None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Manifold Piping Plug Valve #1 1 - Good – No defects observed. NA - Not enough information available.

Manifold PV #1 Actuator None 1 - Good – No defects observed. NA - Not enough information available.

Manifold Piping Plug Valve #2 None 2 - Fair – Only minor defects observed. 2 - Fair – In service, but higher than expected O&M.

Manifold PV #2 Actuator Does not work. 5 - Failing or Failed – Asset integrity is compromised. Asset may be out of service.
5 - Failing or Failed – Asset is not functioning as
intended or is out of service.

Pump #2 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Pump #2 Piping None 2 - Fair – Only minor defects observed. 2 - Fair – In service, but higher than expected O&M.

Pump #2 Check Valve None 2 - Fair – Only minor defects observed. 1 - Good – Asset functioning as intended.

Pump #2 Plug Valve 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Pump #3 passed life limit 4 - Poor – Major defects observed. Asset integrity may be compromised.
4 - Poor – In service, but function is highly impaired.

Pump #3 Piping None 2 - Fair – Only minor defects observed. 2 - Fair – In service, but higher than expected O&M.

Pump #3 Check Valve None 2 - Fair – Only minor defects observed. 1 - Good – Asset functioning as intended.

Pump #3 Plug Valve 2 - Fair – Only minor defects observed. 1 - Good – Asset functioning as intended.

Pump #4 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Pump #4 Piping None 2 - Fair – Only minor defects observed. 2 - Fair – In service, but higher than expected O&M. 1035
Item # 16.

Section 3
City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
3-6
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Table 3-6. Mechanical Condition Data
Asset Name Field Assessment Comments Condition Score Performance Score Pump #4 Check Valve None 2 - Fair – Only minor defects observed. 1 - Good – Asset functioning as intended.

Pump #4 Plug Valve 2 - Fair – Only minor defects observed. 1 - Good – Asset functioning as intended.

Pump #5 (not installed yet) N/A N/A
Pump #5 Piping None 1 - Good – No defects observed. NA - Not enough information available.

Pump #5 Check Valve 1 - Good – No defects observed. NA - Not enough information available.

Pump #5 Plug Valve 1 - Good – No defects observed. NA - Not enough information available.

Main Head Gate None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Head Gate #1 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Head Gate #2 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Head Gate #3 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Head Gate #4 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Grinder #1 Excessive Vibration,Inadequate
Supports
5 - Failing or Failed – Asset integrity is
compromised. Asset may be out of service.
5 - Failing or Failed – Asset is not functioning as
intended or is out of service.

Grinder #2 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Grinder #3 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Grinder #4 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Air Supply Fan 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Exhaust Fan & Stack 1 - Good – No defects observed. 2 - Fair – In service, but higher than expected O&M.

Miscellaneous
2” combo air/vac valve 4 - Poor – Major defects observed. Asset integrity may be compromised.
4 - Poor – In service, but function is highly impaired.

Force Main A B Flow Recorder 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Eye wash 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Flow Meter B It works but the operation
is not accurate.
4 - Poor – Major defects observed. Asset
integrity may be compromised.
4 - Poor – In service, but function is highly impaired.

Air vac 1 to 15 Cavitation,Coating
Failure,Inadequate Supports
5 - Failing or Failed – Asset integrity is
compromised. Asset may be out of service.
5 - Failing or Failed – Asset is not functioning as
intended or is out of service.
1036
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report Section 3 3-7
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Table 3-7. Electrical Condition Data
Asset Name Field Assessment Comments Condition Score Performance Score Main Transformer No defects noted 1 - Excellent 1 - Component Functioning as Intended Outdoor Utility Disconnect and Metering Panel No Corrosion Noted ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended Main Switchgear No Corrosion Noted ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended Variable Frequency Drive P2 No Corrosion Noted ArcFlash labels missing 4 - Integrity of Component Moderately Compromised
2 - In-Service, but Higher than Expected
O&M
Variable Frequency Drive P3 No Corrosion Noted.

Understood from City that
IGBT was replaced a year
ago.

ArcFlash labels missing 4 - Integrity of Component Moderately Compromised
2 - In-Service, but Higher than Expected
O&M
Variable Frequency Drive P4 No Corrosion Noted ArcFlash labels missing 4 - Integrity of Component Moderately Compromised
2 - In-Service, but Higher than Expected
O&M
Variable Frequency Drive P5 No Corrosion Noted.

Understood from City that
Cooling Fans were replaced
year ago
ArcFlash labels missing 4 - Integrity of Component Moderately Compromised
2 - In-Service, but Higher than Expected
O&M
Local Disconnect for Engine Jacket Water Heater No Corrosion Noted 1 - Excellent 1 - Component Functioning as Intended Motor Control Center 2 No Corrosion Noted. ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended Motor Control Center 2A No Corrosion Noted ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended Dry Type Transformer No Corrosion Noted 1 - Excellent 1 - Component Functioning as Intended Lighting panel (LP-1) No Corrosion Noted ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended Dry Type Transformer No Corrosion Noted 1 - Excellent 1 - Component Functioning as Intended Lighting panel (LA) No Corrosion Noted ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended Electrical/Generator Building-Electrical Lighting – Outdated technology
1 - Excellent 1 - Component Functioning as Intended
Motor Control Center A No Corrosion Noted ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended Motor Control Center B No Corrosion Noted ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended Dry Type Transformer No corrosion Noted 1 - Excellent 1 - Component Functioning as Intended Distribution panel(DP-1) No Corrosion Noted ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended 1037
Item # 16.

Section 3
City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
3-8
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Table 3-7. Electrical Condition Data
Asset Name Field Assessment Comments Condition Score Performance Score Dry Type Transformer No Corrosion Noted 1 - Excellent 1 - Component Functioning as Intended Distribution Panel (DP-2) No Corrosion Noted ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended Local Control Panel for Grinder#1 No Corrosion Noted ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended Local Control Panel for Grinder#2 No Corrosion Noted ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended Local Control Panel for Grinder#3 No Corrosion Noted ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended Local Control Panel for Grinder#4 No Corrosion Noted ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended Local Disconnect for CU-1 (for FC-1) 1 - Excellent 1 - Component Functioning as Intended Local Disconnect for EF-1 (for Control Room) No Corrosion Noted 1 - Excellent 1 - Component Functioning as Intended Local Disconnect for EF-5 (for wetwell) No Corrosion Noted 1 - Excellent 1 - Component Functioning as Intended Local Disconnect for SF-1 (for Wet Well) No Corrosion Noted 1 - Excellent 1 - Component Functioning as Intended Local Disconnect for HP-1 (for FC-2) No Corrosion Noted 1 - Excellent 1 - Component Functioning as Intended Local Disconnect for FC-1 (for Control Room) No Corrosion Noted 1 - Excellent 1 - Component Functioning as Intended Generator Good condition 1 - Excellent 1 - Component Functioning as Intended Automatic Transfer Switch No Corrosion Noted ArcFlash labels missing 1 - Excellent 1 - Component Functioning as Intended Table 3-8. Instrumentation Condition Data
Asset Name Asset ID Field Assessment Condition Score Performance Score MAS Enclosure and Pump Motor Monitor Panel MAS 711 No Corrosion Noted 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Level Switch LSHH-201 In Good Condition 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Level Switch LE-202 In Good Condition 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Level Switch LE-203 Not accessible N/A N/A
Generator and Fuel System Control Panel No Corrosion Noted 1 - Good – No defects observed. 1 - Good – Asset functioning as intended. 1038
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report Section 3 3-9
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Table 3-9. Civil Condition Data
Asset Name Field Assessment Comments Condition Score Performance Score Electrical building 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Control building 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Site civil 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Table 3-10. Structural Condition Data
Asset Name Material Field Assessment Comments Condition Score Performance Score Pinch Valve Vault 1 Concrete Corrosion of metal walls None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Pinch Valve Vault 2 Concrete Exposed aggregates 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Pinch Valve Vault 3 Concrete None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Mag Meter Vault Concrete Corrosion of metal walls Corroded metal at hatch opening 2 - Fair – Only minor defects observed. 1 - Good – Asset functioning as intended.

Venturi Meter Vault Concrete Cracks in walls No cracking inside, surface cracks on outside, coating still
present on inside
1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Butterfly Valve Vault Concrete No visible cracks besides on curb outside
1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Electrical/Generator
Building-Structural
Masonry Cracks in walls,Moisture issues Some cracks inside and outside, cosmetic cracks
1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Fuel Tank (bulk) Metal None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Fuel Tank (day) Metal None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Control Building Masonry Cracks in walls None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Grit Chamber/Inflow
Structure
Concrete Poor lighting 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Wet Well Concrete Paint issues Coating appears to be
deteriorating towards bottom,
tanks were in operation, no
inspection of walls and slab
below liquid line
1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Garage Concrete Corrosion of metal walls Water accumulation inside when it’s raining, water seeps thru slab
1 - Good – No defects observed. 1 - Good – Asset functioning as intended. 1039
Item # 16.
1040
Item # 16.
4-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Section 4
Venus Way Lift Station Inspections

4.1 Assets
The assets for Venus Way Lift Station inspections are included in Table 4-1 (Mechanical), Table 4-2 (Electrical), Table 4-3 (Instrumentation), Table 4-4 (Civil), and Table 4-5 (Structural).

Table 4-1. Mechanical Assets
Asset Name Asset Description Asset ID Asset Type Year Installed Pump #1 FLYGT CP3102-441, 5HP 3ph 230V
Submersible Pump
Pump 2008
Pump #2 FLYGT CP3102-441, 5HP 3ph 230V
Submersible Pump
Pump 2008
Pump Guide Rails Reinstalled in 2008 2008
8'' Gate Valve, Pump 1 and 2 8'' Gate Valve, Pump 1 and 2 Valve 2008 8'' Gate Valve, Pump 2 8'' Gate Valve, Pump 2 Valve 2008 8'' Gate Valve, Pump 1 and 2 8'' Gate Valve, Pump 1 and 2 Valve 2008 8'' Check Valve, Pump 1 8'' Check Valve, Pump 1 Valve 2008 8'' Check Valve, Pump 2 8'' Check Valve, Pump 2 Valve 2008 4'' Flap Gate 4'' Flap Gate in wet well Valve 2008
2'' Combo Air/vacuum valve 2'' Combo Air/vacuum valve Valve 2008 Table 4-2. Electrical Assets
Asset Name Asset Description Asset ID Asset Type Year Installed Utility Transformer 240/120 V, 3-Ph, 3 W XFMR T-1 Transformer 2000 Service Pedestal Service Disconnect and Metering 2008
Pump Control Panel Starter panel for Pumps #1 and 2 (Each 5 HP) Panel 2008 Table 4-3. Instrumentation Assets
Asset Name Asset Description Asset ID Asset Type Year Installed Level Instrument Wet Well Level Sensor LSHH-01 Level Switch 2008 Table 4-4. Civil Assets
Asset Name Asset Description Asset ID Asset Type Year Installed Site civil
1041
Item # 16.

Section 4
City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
4-2
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Table 4-5. Structural Assets
Asset Name Asset Description Asset ID Asset Type Year Installed Wet Well 72" Diameter Reinforced Concrete Pipe Tank 1964 Valve Vault Vault 1994
Aluminum Hatch-Vault Aluminum Hatch, slide-in Vault 2008 Aluminum Hatch-Wet Well Aluminum Hatch w/ safety grate Vault 2008

4.2 Condition Data
Field inspections were completed on February 11, 2020 and March 11, 2020. The condition data and scores for Venus Way Lift Station inspections are included in Table 4-6 (Mechanical), Table 4-7 (Electrical), Table 4-8 (Instrumentation), Table 4-9 (Civil), and Table 4-10 (Structural). Condition and performance scores were all 1 (no defects and asset functioning as intended). 1042
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report Section 4 4-3
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Table 4-6. Mechanical Condition Data
Asset Name Field Assessment Comments Condition Score Performance Score Pump #1 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Pump #2 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Pump Guide Rails None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended. 8'' Gate Valve, Pump 1 and 2 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended. 8'' Gate Valve, Pump 2 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended. 8'' Gate Valve, Pump 1 and 2 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended. 8'' Check Valve, Pump 1 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended. 8'' Check Valve, Pump 2 None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended. 4'' Flap Gate Could not find None NA - Not enough information available. NA - Not enough information available. 2'' Combo Air/vacuum valve None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Table 4-7. Electrical Condition Data
Asset Name Field Assessment Comments Condition Score Performance Score Utility Transformer No Corrosion Noted 1 - Excellent 1 - Component Functioning as Intended Service Pedestal 1 - Excellent 1 - Component Functioning as Intended Pump Control Panel No Corrosion Noted 1 - Excellent 1 - Component Functioning as Intended Table 4-8. Instrumentation Condition Data
Asset Name Field Assessment Comments Condition Score Performance Score Level Instrument See wet well photos 1 - Good – No defects observed. 1 - Good – Asset functioning as intended. 1043
Item # 16.

Section 4
City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
4-4
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Table 4-9. Civil Condition Data
Asset Name Field Assessment Comments Condition Score Performance Score Site civil 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Table 4-10. Structural Condition Data
Asset Name Material Field Assessment Comments Condition Score Performance Score Wet Well Concrete Oxidation None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Valve Vault Concrete None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Aluminum Hatch-Vault None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended.

Aluminum Hatch-Wet Well Metal None 1 - Good – No defects observed. 1 - Good – Asset functioning as intended. 1044
Item # 16.
5-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Section 5
Limitations
This document was prepared solely for City of Milpitas in accordance with professional standards at the time the services were performed and in accordance with the contract between City of Milpitas and HydroScience Engineers, Inc., dated October 18, 2019. This document is governed by the specific scope of work authorized by City of Milpitas; it is not intended to be relied upon by any other party except for regulatory authorities contemplated by the scope of work. We have relied on information or instructions provided by City of Milpitas and other parties and, unless otherwise expressly indicated, have made no independent investigation as to the validity, completeness, or accuracy of such information.

Further, Brown and Caldwell makes no warranties, express or implied, with respect to this document, except for those, if any, contained in the agreement pursuant to which the document was prepared.

All data, drawings, documents, or information contained this report have been prepared exclusively for the person or entity to whom it was addressed and may not be relied upon by any other person or entity without the prior written consent of Brown and Caldwell unless otherwise provided by the Agreement pursuant to which these services were provided. 1045
Item # 16.
1046
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
A-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Appendix A: Main Lift Station – Mechanical
1047
Item # 16.
1048
Item # 16.

Created 2020-02-07 16:28:52 PST by Erik Zalkin
Updated 2020-02-20 17:14:36 PST by Hamed Hakimelahi
Location 37.4476, -121.922806
Asset Location Main Pump Station-Mech
Mechanical Asset Name Pig Launcher A
Mechanical Asset Description 36" Pig Launcher
Asset ID PIG-A
Asset Type Pig Launcher
Year Installed 2002
Size/Diameter 36
Coated? Yes
Mechanical Field Assessment None
Coating Condition In tact
Mechanical Equipment Photos
Main Pump Station-Mech
Pig Launcher A, PIG-A
Equipment Data
Page: 1 of 77
1049
Item # 16.

Mechanical Observation Comments Has never been used
Condition
Page: 2 of 77
1050
Item # 16.

Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Pig Launcher B
Mechanical Asset Description 36" Pig Launcher
Asset ID PIG-B
Asset Type Pig Launcher
Year Installed 2002
Size/Diameter 36
Coated? Yes
Mechanical Field Assessment None
Coating Condition In tact
Mechanical Equipment Photos
Performance
Pig Launcher B, PIG-B
Equipment Data
Page: 3 of 77
1051
Item # 16.

Mechanical Observation Comments Never been used
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Condition
Performance
Pinch Valve 1
Page: 4 of 77
1052
Item # 16.

Mechanical Asset Name Pinch Valve 1
Mechanical Asset Description 36'' Pinch Valve (1 of 3)
Asset Type Valve
Year Installed 2002
Mechanical Observation Comments None
Mechanical Condition Score NA - Not enough information available.

Mechanical Performance Score NA - Not enough information available.

Mechanical Asset Name Pinch Valve 2
Mechanical Asset Description 36'' Pinch Valve (2 of 3)
Asset Type Valve
Year Installed 2002
Mechanical Observation Comments None
Mechanical Condition Score NA - Not enough information available.

Mechanical Performance Score NA - Not enough information available.

Mechanical Asset Name Pinch Valve 3
Mechanical Asset Description 36'' Pinch Valve (3 of 3)
Asset Type Valve
Year Installed 2002
Mechanical Observation Comments None
Mechanical Condition Score NA - Not enough information available.

Mechanical Performance Score NA - Not enough information available.

Mechanical Asset Name Mag Meter (flow meter A)
Mechanical Asset Description 24'' Magnetic Meter
Equipment Data
Condition
Performance
Pinch Valve 2
Equipment Data
Condition
Performance
Pinch Valve 3
Equipment Data
Condition
Performance
Mag Meter (flow meter A)
Equipment Data
Page: 5 of 77
1053
Item # 16.

Asset Type Flow Meter
Year Installed 2002
Flow Meter Type Magnetic
Size/Diameter 24"
Coated? No
Mechanical Field Assessment Not in Operation
Mechanical Equipment Photos
Page: 6 of 77
1054
Item # 16.

Mechanical Observation Comments None
Condition
Page: 7 of 77
1055
Item # 16.

Mechanical Condition Score 4 - Poor – Major defects observed. Asset integrity may be compromised.

Mechanical Performance Score 4 - Poor – In service, but function is highly impaired.

Mechanical Asset Name Venturi Meter- Removed in 2008
Mechanical Asset Description 36'' Venturi Meter (taken out) Asset Type Flow Meter
Year Installed 1975
Flow Meter Type Venturi
Size/Diameter 36
Mechanical Observation Comments None
Mechanical Condition Score NA - Not enough information available.

Mechanical Performance Score NA - Not enough information available.

Mechanical Asset Name Butteryfly Valve
Mechanical Asset Description 36'' Butterfly Valve, FM interconnect Asset Type Valve
Year Installed 1970
Mechanical Field Assessment
Mechanical Observation Comments Could not find it in the field Mechanical Condition Score NA - Not enough information available.

Mechanical Performance Score NA - Not enough information available.

Mechanical Asset Name Manifold Piping
Mechanical Asset Description 36-inch flanged coupling adapter. 36-inch ductile iron 45' MJ x MJ bend. 20-inch or 36- inch FLxPE spool through sleeve with link seal. 36'' x 20'' x 36'' ductile iron tee (force main A) Asset Type Piping
Year Installed 2008
Size/Diameter 36
Coated? Yes
Performance
Venturi Meter- Removed in 2008
Equipment Data
Condition
Performance
Butteryfly Valve
Equipment Data
Condition
Performance
Manifold Piping
Equipment Data
Page: 8 of 77
1056
Item # 16.

Mechanical Field Assessment None
Coating Condition Blistered
Mechanical Equipment Photos
Page: 9 of 77
1057
Item # 16.

Page: 10 of 77
1058
Item # 16.

Mechanical Observation Comments According to staff, the pipes operate well.

Mechanical Condition Score 2 - Fair – Only minor defects observed.

Mechanical Performance Score 2 - Fair – In service, but higher than expected O&M.

Mechanical Asset Name Manifold Piping Butterfly Valve
Mechanical Asset Description 36-inch diameter BFV, middle of manifold Asset Type Valve
Year Installed 2008
Control Type Local
Drive Type Manual
Valve Type Butterfly
Size/Diameter 36
Mechanical Field Assessment None
Mechanical Equipment Photos
Condition
Performance
Manifold Piping Butterfly Valve
Equipment Data
Page: 11 of 77
1059
Item # 16.

Page: 12 of 77
1060
Item # 16.

Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Manifold Piping Plug Valve #1
Mechanical Asset Description 36-inch diameter PV, pumps 1, 2, 3 Asset Type Valve
Year Installed 2008
Drive Type Manual
Valve Type Plug
Size/Diameter 36
Mechanical Field Assessment
Condition
Performance
Manifold Piping Plug Valve #1
Equipment Data
Page: 13 of 77
1061
Item # 16.

Mechanical Equipment Photos
Mechanical Observation Comments Pump 1 has not been installed yet Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score NA - Not enough information available.

Mechanical Asset Name Manifold PV #1 Actuator
Mechanical Asset Description plug valve #1 electric actuator Asset Type Actuator
Year Installed 2008
Control Type Local
Drive Type Electric
Mechanical Field Assessment None
Mechanical Equipment Photos
Condition
Performance
Manifold PV #1 Actuator
Equipment Data
Page: 14 of 77
1062
Item # 16.

Page: 15 of 77
1063
Item # 16.

Page: 16 of 77
1064
Item # 16.

Page: 17 of 77
1065
Item # 16.

Mechanical Observation Comments operator has never used this. The operator dont know if the actuator works.

Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score NA - Not enough information available.

Mechanical Asset Name Manifold Piping Plug Valve #2
Mechanical Asset Description 36-inch diameter PV, pumps 4, 5, 6 Asset Type Valve
Condition
Performance
Manifold Piping Plug Valve #2
Equipment Data
Page: 18 of 77
1066
Item # 16.

Year Installed 2008
Valve Type Plug
Size/Diameter 36
Mechanical Field Assessment None
Mechanical Equipment Photos
Mechanical Observation Comments None
Mechanical Condition Score 2 - Fair – Only minor defects observed.

Mechanical Performance Score 2 - Fair – In service, but higher than expected O&M.

Mechanical Asset Name Manifold PV #2 Actuator
Mechanical Asset Description plug valve #2 electric actuator Asset Type Actuator
Year Installed 2008
Control Type Local
Drive Type Electric
Mechanical Field Assessment Does not work.

Mechanical Equipment Photos
Condition
Performance
Manifold PV #2 Actuator
Equipment Data
Page: 19 of 77
1067
Item # 16.

Page: 20 of 77
1068
Item # 16.

Page: 21 of 77
1069
Item # 16.

Mechanical Observation Comments None
Mechanical Condition Score 5 - Failing or Failed – Asset integrity is compromised. Asset may be out of service.

Mechanical Performance Score 5 - Failing or Failed – Asset is not functioning as intended or is out of service.

Mechanical Asset Name Pump #2
Mechanical Asset Description FLYGT CP3531-775, 170HP Submersible Pump Asset Type Pump
Year Installed 2008
Pump Type Submersible
Mechanical Field Assessment None
Mechanical Equipment Photos
Condition
Performance
Pump #2
Equipment Data
Page: 22 of 77
1070
Item # 16.

Page: 23 of 77
1071
Item # 16.

Page: 24 of 77
1072
Item # 16.

Page: 25 of 77
1073
Item # 16.

Page: 26 of 77
1074
Item # 16.

Mechanical Observation Comments Rebuilt 1.5 yeara ago
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Pump #2 Piping
Mechanical Asset Description 20-Inch Ductile Iron Vertical Discharge Pipe, 20-Inch Ductile Iron 90 Elbow, 20-Inch Flanged Coupling Adapter
Asset Type Piping
Year Installed 2008
Size/Diameter 20"
Coated? Yes
Mechanical Field Assessment None
Coating Condition In tact
Mechanical Observation Comments None
Mechanical Condition Score 2 - Fair – Only minor defects observed.

Mechanical Performance Score 2 - Fair – In service, but higher than expected O&M.

Mechanical Asset Name Pump #2 Check Valve
Condition
Performance
Pump #2 Piping
Equipment Data
Condition
Performance
Pump #2 Check Valve
Equipment Data
Page: 27 of 77
1075
Item # 16.

Mechanical Asset Description 20-Inch Diameter Spring Loaded Check Valve Asset Type Valve
Year Installed 2008
Valve Type Check
Size/Diameter 20
Mechanical Field Assessment None
Mechanical Equipment Photos
Page: 28 of 77
1076
Item # 16.

Page: 29 of 77
1077
Item # 16.

Mechanical Observation Comments None
Mechanical Condition Score 2 - Fair – Only minor defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Condition
Performance
Pump #2 Plug Valve
Page: 30 of 77
1078
Item # 16.

Mechanical Asset Name Pump #2 Plug Valve
Mechanical Asset Description 20-Inch Diameter Plug Valve Asset Type Valve
Year Installed 2008
Control Type Local
Valve Type Plug
Size/Diameter 20
Equipment Data
Page: 31 of 77
1079
Item # 16.

Mechanical Equipment Photos
Mechanical Observation Comments None
Condition
Page: 32 of 77
1080
Item # 16.

Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Pump #3
Mechanical Asset Description FLYGT CP3531-775, 170HP Submersible Pump Asset Type Pump
Year Installed 2008
Pump Type Submersible
Mechanical Field Assessment passed life limit
Mechanical Equipment Photos
Performance
Pump #3
Equipment Data
Page: 33 of 77
1081
Item # 16.

Mechanical Observation Comments It has 50,000 hours on it. Should be replaced.

Mechanical Condition Score 4 - Poor – Major defects observed. Asset integrity may be compromised.

Mechanical Performance Score 4 - Poor – In service, but function is highly impaired.

Mechanical Asset Name Pump #3 Piping
Mechanical Asset Description 20-Inch Ductile Iron Vertical Discharge Pipe, 20-Inch Ductile Iron 90 Elbow, 20-Inch Flanged Coupling Adapter
Asset Type Piping
Year Installed 2008
Size/Diameter 20"
Coated? Yes
Mechanical Field Assessment None
Coating Condition In tact
Condition
Performance
Pump #3 Piping
Equipment Data
Page: 34 of 77
1082
Item # 16.

Mechanical Equipment Photos
Mechanical Observation Comments None
Mechanical Condition Score 2 - Fair – Only minor defects observed.

Mechanical Performance Score 2 - Fair – In service, but higher than expected O&M.

Mechanical Asset Name Pump #3 Check Valve
Mechanical Asset Description 20-Inch Diameter Spring Loaded Check Valve Asset Type Valve
Year Installed 2008
Size/Diameter 20"
Mechanical Field Assessment None
Mechanical Equipment Photos
Condition
Performance
Pump #3 Check Valve
Equipment Data
Page: 35 of 77
1083
Item # 16.

Page: 36 of 77
1084
Item # 16.

Mechanical Observation Comments None
Mechanical Condition Score 2 - Fair – Only minor defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Pump #3 Plug Valve
Mechanical Asset Description 20-Inch Diameter Plug Valve Asset Type Valve
Year Installed 2008
Valve Type Plug
Size/Diameter 20"
Condition
Performance
Pump #3 Plug Valve
Equipment Data
Page: 37 of 77
1085
Item # 16.

Mechanical Equipment Photos
Mechanical Observation Comments None
Mechanical Condition Score 2 - Fair – Only minor defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Pump #4
Mechanical Asset Description FLYGT CP3531-775, 170HP Submersible Pump Asset Type Pump
Year Installed 2008
Pump Type Submersible
Mechanical Field Assessment None
Condition
Performance
Pump #4
Equipment Data
Page: 38 of 77
1086
Item # 16.

Mechanical Equipment Photos
Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Condition
Performance
Pump #4 Piping
Page: 39 of 77
1087
Item # 16.

Mechanical Asset Name Pump #4 Piping
Mechanical Asset Description 20-Inch Ductile Iron Vertical Discharge Pipe, 20-Inch Ductile Iron 90 Elbow, 20-Inch Flanged Coupling Adapter
Asset Type Piping
Year Installed 2008
Size/Diameter 20"
Coated? Yes
Mechanical Field Assessment None
Coating Condition In tact
Mechanical Equipment Photos
Mechanical Observation Comments None
Mechanical Condition Score 2 - Fair – Only minor defects observed.

Mechanical Performance Score 2 - Fair – In service, but higher than expected O&M.

Mechanical Asset Name Pump #4 Check Valve
Mechanical Asset Description 20-Inch Diameter Spring Loaded Check Valve Asset Type Valve
Year Installed 2008
Valve Type Check
Size/Diameter 20"
Mechanical Field Assessment None
Mechanical Observation Comments None
Equipment Data
Condition
Performance
Pump #4 Check Valve
Equipment Data
Page: 40 of 77
1088
Item # 16.

Mechanical Condition Score 2 - Fair – Only minor defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Pump #4 Plug Valve
Mechanical Asset Description 20-Inch Diameter Plug Valve Asset Type Valve
Year Installed 2008
Valve Type Plug
Size/Diameter 20
Mechanical Observation Comments None
Mechanical Condition Score 2 - Fair – Only minor defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Pump #5 (not installed yet)
Mechanical Asset Description FLYGT CP3531-775, 170HP Submersible Pump Asset Type Pump
Mechanical Equipment Photos
Condition
Performance
Pump #4 Plug Valve
Equipment Data
Condition
Performance
Pump #5 (not installed yet)
Equipment Data
Page: 41 of 77
1089
Item # 16.

Mechanical Observation Comments None
Mechanical Asset Name Pump #5 Piping
Mechanical Asset Description 20-Inch Ductile Iron Vertical Discharge Pipe, 20-Inch Ductile Iron 90 Elbow, 20-Inch Flanged Coupling Adapter
Asset Type Piping
Pump #5 Piping
Equipment Data
Page: 42 of 77
1090
Item # 16.

Year Installed 2008
Mechanical Field Assessment None
Mechanical Observation Comments The piping is not being used, Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score NA - Not enough information available.

Mechanical Asset Name Pump #5 Check Valve
Mechanical Asset Description 20-Inch Diameter Spring Loaded Check Valve Asset Type Valve
Year Installed 2008
Mechanical Observation Comments Not being used,
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score NA - Not enough information available.

Mechanical Asset Name Pump #5 Plug Valve
Mechanical Asset Description 20-Inch Diameter Plug Valve Asset Type Valve
Year Installed 2008
Mechanical Observation Comments Not being used
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score NA - Not enough information available.

Mechanical Asset Name Main Head Gate
Mechanical Asset Description 54-inch sluice gate with manual actuator Asset Type Gate
Year Installed 2008
Control Type Local
Drive Type Manual
Condition
Performance
Pump #5 Check Valve
Equipment Data
Condition
Performance
Pump #5 Plug Valve
Equipment Data
Condition
Performance
Main Head Gate
Equipment Data
Page: 43 of 77
1091
Item # 16.

Gate Type Sluice
Size/Diameter 54"
Mechanical Field Assessment None
Mechanical Equipment Photos
Page: 44 of 77
1092
Item # 16.

Page: 45 of 77
1093
Item # 16.

Mechanical Observation Comments None
Condition
Page: 46 of 77
1094
Item # 16.

Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Head Gate #1
Mechanical Asset Description 48-inch sluice gate with electric actuator Asset Type Gate
Year Installed 2008
Control Type Local
Drive Type Electric
Gate Type Sluice
Size/Diameter 48"
Mechanical Field Assessment None
Mechanical Equipment Photos
Performance
Head Gate #1
Equipment Data
Page: 47 of 77
1095
Item # 16.

Page: 48 of 77
1096
Item # 16.

Page: 49 of 77
1097
Item # 16.

Page: 50 of 77
1098
Item # 16.

Mechanical Observation Comments None
Condition
Page: 51 of 77
1099
Item # 16.

Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Head Gate #2
Mechanical Asset Description 48-inch sluice gate with electric actuator Asset Type Gate
Year Installed 2008
Control Type Local
Drive Type Electric
Gate Type Sluice
Size/Diameter 48
Mechanical Field Assessment None
Mechanical Equipment Photos
Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Performance
Head Gate #2
Equipment Data
Condition
Performance
Page: 52 of 77
1100
Item # 16.

Mechanical Asset Name Head Gate #3
Mechanical Asset Description 48-inch sluice gate with electric actuator Asset Type Gate
Year Installed 2008
Control Type Local
Drive Type Electric
Gate Type Sluice
Size/Diameter 48
Mechanical Field Assessment None
Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Head Gate #4
Mechanical Asset Description 48-inch sluice gate with electric actuator Asset Type Gate
Year Installed 2008
Control Type Local
Drive Type Electric
Gate Type Sluice
Size/Diameter 48
Mechanical Field Assessment None
Head Gate #3
Equipment Data
Condition
Performance
Head Gate #4
Equipment Data
Page: 53 of 77
1101
Item # 16.

Mechanical Equipment Photos
Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Condition
Performance
Grinder #1
Page: 54 of 77
1102
Item # 16.

Mechanical Asset Name Grinder #1
Mechanical Asset Description 5-hp electric driven
Asset Type Grinder
Year Installed 2008
Control Type Local
Drive Type Electric
Mechanical Field Assessment Excessive Vibration, Inadequate Supports Mechanical Equipment Photos
Equipment Data
Page: 55 of 77
1103
Item # 16.

Page: 56 of 77
1104
Item # 16.

Mechanical Observation Comments None
Mechanical Condition Score 5 - Failing or Failed – Asset integrity is compromised. Asset may be out of service.

Mechanical Performance Score 5 - Failing or Failed – Asset is not functioning as intended or is out of service.

Mechanical Asset Name Grinder #2
Mechanical Asset Description 10-hp electric driven
Asset Type Grinder
Condition
Performance
Grinder #2
Equipment Data
Page: 57 of 77
1105
Item # 16.

Year Installed 2008
Control Type Local
Drive Type Electric
Mechanical Field Assessment None
Page: 58 of 77
1106
Item # 16.

Mechanical Equipment Photos
Mechanical Observation Comments None
Condition
Page: 59 of 77
1107
Item # 16.

Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Grinder #3
Mechanical Asset Description 10-hp electric driven
Asset Type Grinder
Year Installed 2008
Control Type Local
Drive Type Electric
Mechanical Field Assessment None
Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Grinder #4
Mechanical Asset Description 5-hp electric driven
Asset Type Grinder
Year Installed 2008
Control Type Local
Drive Type Electric
Mechanical Field Assessment None
Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Air Supply Fan
Mechanical Asset Description PS ventilation system
Asset Type Fan
Year Installed 2008
Performance
Grinder #3
Equipment Data
Condition
Performance
Grinder #4
Equipment Data
Condition
Performance
Air Supply Fan
Equipment Data
Page: 60 of 77
1108
Item # 16.

Mechanical Equipment Photos
Page: 61 of 77
1109
Item # 16.

Page: 62 of 77
1110
Item # 16.

Page: 63 of 77
1111
Item # 16.

Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Exhause Fan & Stack
Mechanical Asset Description PS ventilation system
Asset Type Fan
Year Installed 2008
Mechanical Equipment Photos
Condition
Performance
Exhause Fan & Stack
Equipment Data
Page: 64 of 77
1112
Item # 16.

Page: 65 of 77
1113
Item # 16.

Page: 66 of 77
1114
Item # 16.

Mechanical Observation Comments None
Condition
Page: 67 of 77
1115
Item # 16.

Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 2 - Fair – In service, but higher than expected O&M.

Mechanical Asset Name Miscellaneous
Mechanical Asset Description Pipe support, 5' x 7' aluminum hatch, galv grating, 3'' SS guide rail, 4-inch diameter PVC drain, pipe wall anchor bracket
Mechanical Observation Comments None
Mechanical Asset Name 2” combo air/vac valve
Mechanical Equipment Photos
Performance
Miscellaneous
Equipment Data
2” combo air/vac valve
Equipment Data
Page: 68 of 77
1116
Item # 16.

Mechanical Observation Comments None
Condition
Page: 69 of 77
1117
Item # 16.

Mechanical Condition Score 4 - Poor – Major defects observed. Asset integrity may be compromised.

Mechanical Performance Score 4 - Poor – In service, but function is highly impaired.

Mechanical Asset Name Force Main A B Flow Recorder
Mechanical Equipment Photos
Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Eye wash
Mechanical Equipment Photos
Performance
Force Main A B Flow Recorder
Equipment Data
Condition
Performance
Eye wash
Equipment Data
Page: 70 of 77
1118
Item # 16.

Mechanical Observation Comments None
Condition
Page: 71 of 77
1119
Item # 16.

Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Flow Meter B
Mechanical Asset Description This is for force main B
Mechanical Field Assessment It works but the operation is not accurate.

Mechanical Equipment Photos
Performance
Flow Meter B
Equipment Data
Page: 72 of 77
1120
Item # 16.

Page: 73 of 77
1121
Item # 16.

Mechanical Observation Comments None
Mechanical Condition Score 4 - Poor – Major defects observed. Asset integrity may be compromised.

Mechanical Performance Score 4 - Poor – In service, but function is highly impaired.

Mechanical Asset Name Air vac 1 to 15
Mechanical Asset Description All across the pump station.

Mechanical Field Assessment Cavitation, Coating Failure, Inadequate Supports Mechanical Equipment Photos
Condition
Performance
Air vac 1 to 15
Equipment Data
Page: 74 of 77
1122
Item # 16.

Page: 75 of 77
1123
Item # 16.

Mechanical Observation Comments None
Condition
Page: 76 of 77
1124
Item # 16.

Mechanical Condition Score 5 - Failing or Failed – Asset integrity is compromised. Asset may be out of service.

Mechanical Performance Score 5 - Failing or Failed – Asset is not functioning as intended or is out of service.

Performance
Page: 77 of 77
1125
Item # 16.
1126
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
B-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Appendix B: Main Lift Station – Electrical
1127
Item # 16.
1128
Item # 16.

Created 2020-02-07 23:14:55 UTC by Erik Zalkin
Updated 2020-02-22 00:03:47 UTC by Sundara Palani
Location 37.44755, -121.922864
Asset Location Main Pump Station-Elec
Electrical Asset Name Main Transformer
Electrical Asset Description 1000 kVA, 12 kV-480 V, 3-ph (PG&E) Electrical Asset Type Transformer
Year Installed 2000
Age 20
Manufacturer PG&E
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels N/A
Electrical Equipment Photos
Main Pump Station-Elec
Main Transformer
Electrical Equipment
Electrical Equipment Observations
Page: 1 of 51
1129
Item # 16.

Page: 2 of 51
1130
Item # 16.

Electrical Equipment Observations No defects noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Outdoor Utility Disconnect and Metering Panel Electrical Asset Description Outdoor NEMA 3R Enclosure
Electrical Asset Type Panel
Year Installed 2000
Age 20 Years
Manufacturer Eaton
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Electrical Equipment Photos
Outdoor Utility Disconnect and Metering Panel
Electrical Equipment
Electrical Equipment Observations
Page: 3 of 51
1131
Item # 16.

Page: 4 of 51
1132
Item # 16.

Page: 5 of 51
1133
Item # 16.

Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Page: 6 of 51
1134
Item # 16.

Electrical Asset Name Main Switchgear
Electrical Asset Description Located in Existing Generator Building Electrical Asset Type Switchgear
Year Installed 2000
Age 20 Years
Manufacturer RSE- SIERRA
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces Two Space available Electrical Equipment Photos
Main Switchgear
Electrical Equipment
Electrical Equipment Observations
Page: 7 of 51
1135
Item # 16.

Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Variable Frequency Drive P2
Electrical Asset Description VFD for Pump 2 (170 HP)
Electrical Asset Type Variable Freq Drive
Year Installed 2008
Age 12 years
Manufacturer Allen Bradley
Model Power Flex 700 Series
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Electrical Equipment Photos
Variable Frequency Drive P2
Electrical Equipment
Electrical Equipment Observations
Page: 8 of 51
1136
Item # 16.

Page: 9 of 51
1137
Item # 16.

Page: 10 of 51
1138
Item # 16.

Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 4 - Integrity of Component Moderately Compromised Electrical Equipment Performance Score 2 - In-Service, but Higher than Expected O&M Page: 11 of 51
1139
Item # 16.

Electrical Asset Name Variable Frequency Drive P3
Electrical Asset Description VFD for Pump 3 (170 HP)
Electrical Asset Type Variable Freq Drive
Year Installed 2008
Age 12 Years
Manufacturer Allen Bradley
Model Power Flex 700 Series
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces Not Applicable
Electrical Equipment Observations No Corrosion Noted. Understood from City that IGBT was replaced a year ago.

Electrical Equipment Condition Score 4 - Integrity of Component Moderately Compromised Electrical Equipment Performance Score 2 - In-Service, but Higher than Expected O&M Electrical Asset Name Variable Frequency Drive P4
Electrical Asset Description VFD for Pump 4 (170 HP)
Electrical Asset Type Variable Freq Drive
Year Installed 2008
Age 12 Years
Manufacturer Allen Bradley
Model Power Flex 700 Series
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces NA
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 4 - Integrity of Component Moderately Compromised Electrical Equipment Performance Score 2 - In-Service, but Higher than Expected O&M Electrical Asset Name Variable Frequency Drive P5
Electrical Asset Description VFD for Pump 5 (170 HP)
Electrical Asset Type Variable Freq Drive
Year Installed 2008
Variable Frequency Drive P3
Electrical Equipment
Electrical Equipment Observations
Variable Frequency Drive P4
Electrical Equipment
Electrical Equipment Observations
Variable Frequency Drive P5
Page: 12 of 51
1140
Item # 16.

Age 12 Years
Manufacturer Allen Bradley
Model Power Flex 700 Series
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces NA
Electrical Equipment Observations No Corrosion Noted. Understood from City that Cooling Fans were replaced year ago Electrical Equipment Condition Score 4 - Integrity of Component Moderately Compromised Electrical Equipment Performance Score 2 - In-Service, but Higher than Expected O&M Electrical Asset Name Local Disconnect for Engine Jacket Water Heater Electrical Asset Description 30A/3P
Electrical Asset Type Switch
Year Installed 2000
Age 20 Years
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels NA
Number of Available Spares and Spaces NA
Electrical Equipment
Electrical Equipment Observations
Local Disconnect for Engine Jacket Water Heater
Electrical Equipment
Electrical Equipment Observations
Page: 13 of 51
1141
Item # 16.

Electrical Equipment Photos
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Motor Control Center 2
Electrical Asset Description 600 A, 480 V, 3-ph, 3W, 65000 AIC Asset ID MCC-2
Electrical Asset Type Motor Control Center
Year Installed 2000
Age 20 Years
Manufacturer Eaton
Model Freedom Series 2100
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces Spaces available
Motor Control Center 2
Electrical Equipment
Electrical Equipment Observations
Page: 14 of 51
1142
Item # 16.

Electrical Equipment Photos
Electrical Equipment Observations No Corrosion Noted.

Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Motor Control Center 2A
Electrical Asset Description 600 A, 480 V, 3-ph, 3W, 65000 AIC Asset ID MCC-2A
Electrical Asset Type Motor Control Center
Year Installed 2000
Age 20 Years
Manufacturer Eaton
Model Freedom 2100 Series
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces Spaces Available
Electrical Equipment Photos
Motor Control Center 2A
Electrical Equipment
Electrical Equipment Observations
Page: 15 of 51
1143
Item # 16.

Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Page: 16 of 51
1144
Item # 16.

Electrical Asset Name Dry Type Transformer
Electrical Asset Description 30 kVA, 480-208/120 V, Dry Type Electrical Asset Type Transformer
Year Installed 2008
Age 12 Years
Manufacturer Eaton
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels NA
Number of Available Spares and Spaces NA
Electrical Equipment Photos
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Lighting panel (LP-1)
Asset ID LA
Electrical Asset Type Panel
Year Installed 2008
Dry Type Transformer
Electrical Equipment
Electrical Equipment Observations
Lighting panel (LP-1)
Page: 17 of 51
1145
Item # 16.

Age 12 Years
Manufacturer Eaton
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces 10 Spares available Electrical Equipment Photos
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Dry Type Transformer
Electrical Asset Description 30 kVA, 480-208/120 V, Dry Type Electrical Asset Type Transformer
Year Installed 2000
Age 20 Years
Manufacturer GE
Electrical Equipment
Electrical Equipment Observations
Dry Type Transformer
Electrical Equipment
Electrical Equipment Observations
Page: 18 of 51
1146
Item # 16.

Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels NA
Number of Available Spares and Spaces NA
Electrical Equipment Photos
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Lighting panel (LA)
Electrical Asset Description 100 A, 1-Ph, 3 Wire
Asset ID LP-1
Electrical Asset Type Panel
Year Installed 2000
Age 20 Years
Manufacturer GE
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces 10 Spares available Lighting panel (LA)
Electrical Equipment
Electrical Equipment Observations
Page: 19 of 51
1147
Item # 16.

Electrical Equipment Photos
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Page: 20 of 51
1148
Item # 16.

Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Electrical/Generator Building-Electrical Electrical Asset Type Building
Year Installed 2000
Electrical Conduits Good Condition
Electrical Pull and Junction Boxes Good Condition
Electrical Lighting Outdated Technology
Electrical Building Photos
Electrical/Generator Building-Electrical
Electrical Building
Electrical Building Observations
Page: 21 of 51
1149
Item # 16.

Electrical Building Observations No Corrosion Noted on Conduits and Pull Boxes Electrical Building Condition Score 1 - Excellent
Electrical Building Performance Score 1 - Component Functioning as Intended Electrical Asset Name Motor Control Center A
Electrical Asset Description 400 A, 480 V, 3-ph, 3W, 65000 AIC Asset ID MCC-A
Electrical Asset Type Motor Control Center
Year Installed 2008
Age 12 Years
Manufacturer Eaton
Model Freedom 2000 Series
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces 2 Space available Electrical Equipment Photos
Motor Control Center A
Electrical Equipment
Electrical Equipment Observations
Page: 22 of 51
1150
Item # 16.

Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Page: 23 of 51
1151
Item # 16.

Electrical Asset Name Motor Control Center B
Electrical Asset Description 400 A, 480 V, 3-ph, 3W, 65000 AIC Asset ID MCC-B
Electrical Asset Type Motor Control Center
Year Installed 2008
Age 12 Years
Manufacturer Eaton
Model Freedom 2000 Series
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces 3 Spaces available Electrical Equipment Photos
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Dry Type Transformer
Electrical Asset Description 10 kVA, 480-240/120 V, Dry Type Motor Control Center B
Electrical Equipment
Electrical Equipment Observations
Dry Type Transformer
Page: 24 of 51
1152
Item # 16.

Electrical Asset Type Transformer
Year Installed 2008
Age 12 Years
Manufacturer Eaton
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels NA
Number of Available Spares and Spaces NA
Electrical Equipment Photos
Electrical Equipment
Electrical Equipment Observations
Page: 25 of 51
1153
Item # 16.

Electrical Equipment Observations No corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Distribution panel(DP-1)
Electrical Asset Description 125 A, NEMA Type 1
Asset ID DP-1
Electrical Asset Type Panel
Year Installed 2008
Age 12 Years
Manufacturer Eaton
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces 15 Spare Breakers available Electrical Equipment Photos
Distribution panel(DP-1)
Electrical Equipment
Electrical Equipment Observations
Page: 26 of 51
1154
Item # 16.

Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Page: 27 of 51
1155
Item # 16.

Electrical Asset Name Dry Type Transformer
Electrical Asset Description 75 kVA, 480-208/120 V, Dry Type Electrical Asset Type Transformer
Year Installed 2008
Age 12 Years
Manufacturer Eaton
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels NA
Number of Available Spares and Spaces NA
Electrical Equipment Photos
Dry Type Transformer
Electrical Equipment
Electrical Equipment Observations
Page: 28 of 51
1156
Item # 16.

Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Page: 29 of 51
1157
Item # 16.

Electrical Asset Name Distribution Panel (DP-2)
Electrical Asset Description 125 A, NEMA Type 1
Asset ID DP-2
Electrical Asset Type Panel
Year Installed 2008
Age 12 Years
Manufacturer Eaton
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces 6 Spares available Electrical Equipment Photos
Distribution Panel (DP-2)
Electrical Equipment
Electrical Equipment Observations
Page: 30 of 51
1158
Item # 16.

Page: 31 of 51
1159
Item # 16.

Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Local Control Panel for Grinder#1 Electrical Asset Description LCP grinder1
Electrical Asset Type Panel
Year Installed 2008
Age 12 Years
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces NA
Local Control Panel for Grinder#1
Electrical Equipment
Electrical Equipment Observations
Page: 32 of 51
1160
Item # 16.

Electrical Equipment Photos
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Local Control Panel for Grinder#2 Electrical Asset Description LCP grinder2
Electrical Asset Type Panel
Year Installed 2008
Age 12 Years
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces NA
Local Control Panel for Grinder#2
Electrical Equipment
Electrical Equipment Observations
Page: 33 of 51
1161
Item # 16.

Electrical Equipment Photos
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Local Control Panel for Grinder#3 Electrical Asset Description LCP grinder3
Electrical Asset Type Panel
Year Installed 2008
Age 12 Years
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces NA
Local Control Panel for Grinder#3
Electrical Equipment
Electrical Equipment Observations
Page: 34 of 51
1162
Item # 16.

Electrical Equipment Photos
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Local Control Panel for Grinder#4 Electrical Asset Description LCP grinder4
Electrical Asset Type Panel
Year Installed 2008
Age 12 Years
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces NA
Electrical Equipment Photos
Local Control Panel for Grinder#4
Electrical Equipment
Electrical Equipment Observations
Page: 35 of 51
1163
Item # 16.

Page: 36 of 51
1164
Item # 16.

Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Local Disconnect for CU-1 (for FC-1) Electrical Asset Description 30A/3P
Electrical Asset Type Switch
Year Installed 2008
Local Disconnect for CU-1 (for FC-1)
Electrical Equipment
Electrical Equipment Observations
Page: 37 of 51
1165
Item # 16.

Electrical Equipment Photos
Electrical Asset Name Local Disconnect for EF-1 (for Control Room) Electrical Asset Description 30A/3P
Electrical Asset Type Switch
Year Installed 2008
Age 12 Years
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels NA
Number of Available Spares and Spaces NA
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Local Disconnect for EF-5 (for wetwell) Electrical Asset Description 60A/3P
Electrical Asset Type Switch
Year Installed 2008
Local Disconnect for EF-1 (for Control Room)
Electrical Equipment
Electrical Equipment Observations
Local Disconnect for EF-5 (for wetwell)
Page: 38 of 51
1166
Item # 16.

Age 12 Years
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels NA
Number of Available Spares and Spaces NA
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Local Disconnect for SF-1 (for Wet Well) Electrical Asset Description 60A/3P
Electrical Asset Type Switch
Year Installed 2008
Age 12 Years
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels NA
Number of Available Spares and Spaces NA
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Local Disconnect for HP-1 (for FC-2) Electrical Asset Description 30A/3P
Electrical Asset Type Switch
Year Installed 2008
Age 12 Years
Manufacturer Square D
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels NA
Electrical Equipment
Electrical Equipment Observations
Local Disconnect for SF-1 (for Wet Well)
Electrical Equipment
Electrical Equipment Observations
Local Disconnect for HP-1 (for FC-2)
Electrical Equipment
Electrical Equipment Observations
Page: 39 of 51
1167
Item # 16.

Electrical Equipment Photos
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Local Disconnect for FC-1 (for Control Room) Electrical Asset Description 30A/3P
Electrical Asset Type Switch
Year Installed 2008
Age 12 Years
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels NA
Number of Available Spares and Spaces NA
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Generator
Electrical Asset Description 1000 kVA, 480 V Diesel Driven Engine Generator Local Disconnect for FC-1 (for Control Room)
Electrical Equipment
Electrical Equipment Observations
Generator
Page: 40 of 51
1168
Item # 16.

Electrical Asset Type Generator
Year Installed 2000
Age 20 Years
Manufacturer Caterpillar
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Visible Motor Monitoring Equipment Good Condition
Electrical Motor Photos
Electrical Motor or Generator
Electrical Motor or Generator Observations
Page: 41 of 51
1169
Item # 16.

Page: 42 of 51
1170
Item # 16.

Page: 43 of 51
1171
Item # 16.

Page: 44 of 51
1172
Item # 16.

Page: 45 of 51
1173
Item # 16.

Page: 46 of 51
1174
Item # 16.

Page: 47 of 51
1175
Item # 16.

Page: 48 of 51
1176
Item # 16.

Page: 49 of 51
1177
Item # 16.

Electrical Motor Observations No Corrosion Noted
Electrical Motor Condition Score 1 - Excellent
Electrical Motor Performance Score 1 - Component Functioning as Intended Electrical Asset Name Automatic Transfer Switch
Electrical Asset Description ATS, 1600 A
Electrical Asset Type Switch
Year Installed 2000
Age 20 Years
Manufacturer ASCO
Model ASCO 7 Series
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces NA
Electrical Equipment Photos
Automatic Transfer Switch
Electrical Equipment
Electrical Equipment Observations
Page: 50 of 51
1178
Item # 16.

Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Page: 51 of 51
1179
Item # 16.
1180
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
C-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Appendix C: Main Lift Station – Instrumentation
1181
Item # 16.
1182
Item # 16.

Created 2020-02-08 00:28:37 UTC by Erik Zalkin
Updated 2020-02-19 17:40:26 UTC by Sundara Palani
Location 37.447504, -121.922779
Asset Location Main Pump Station-Instr
Asset Name MAS Enclosure and Pump Motor Monitor Panel
Asset Description MAS
Asset ID MAS 711
Asset Type Panel
Year Installed 2008
Instrumentation Photos
Main Pump Station-Instr
MAS Enclosure and Pump Motor Monitor Panel, MAS 711
Page: 1 of 5
1183
Item # 16.

Instrumentation Observation Comments No Corrosion Noted Instrumentation Condition Score 1 - Good – No defects observed.

Instrumentation Performance Score 1 - Good – Asset functioning as intended.

Asset Name Level Switch
Asset Description Level High High
Asset ID LSHH-201
Asset Type Level Switch
Year Installed 2008
Instrumentation Observation Comments In Good Condition
Instrumentation Condition Score 1 - Good – No defects observed.

Instrumentation Performance Score 1 - Good – Asset functioning as intended.

Asset Name Level Switch
Asset Description Ultrosonic level
Asset ID LE-202
Condition
Performance
Level Switch, LSHH-201
Condition
Performance
Level Switch, LE-202
Page: 2 of 5
1184
Item # 16.

Asset Type Level Switch
Year Installed 2008
Instrumentation Observation Comments In Good Condition
Instrumentation Condition Score 1 - Good – No defects observed.

Instrumentation Performance Score 1 - Good – Asset functioning as intended.

Asset Name Level Switch
Asset Description Ultrosonic level
Asset ID LE-203
Asset Type Level Switch
Year Installed 2008
Asset Name Generator and Fuel System Control Panel
Asset Description Local Control Panel
Asset Type Panel
Year Installed 2000
Instrumentation Photos
Condition
Performance
Level Switch, LE-203
Generator and Fuel System Control Panel
Page: 3 of 5
1185
Item # 16.

Instrumentation Observation Comments No Corrosion Noted Instrumentation Condition Score 1 - Good – No defects observed.

Instrumentation Performance Score 1 - Good – Asset functioning as intended.

Asset Name Main Lift Station Control Panel
Asset Description Local Control Panel
Asset Type Panel
Year Installed 2008
Condition
Performance
Main Lift Station Control Panel
Page: 4 of 5
1186
Item # 16.

Instrumentation Photos
Instrumentation Condition Score 1 - Good – No defects observed.

Instrumentation Performance Score 1 - Good – Asset functioning as intended.

Condition
Performance
Page: 5 of 5
1187
Item # 16.
1188
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
D-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Appendix D: Main Lift Station – Civil
1189
Item # 16.
1190
Item # 16.

Created 2020-02-07 16:28:25 PST by Erik Zalkin
Updated 2020-02-11 11:12:14 PST by Hamed Hakimelahi
Location 37.447588, -121.922757
Asset Location Main Pump Station-Civil
Asset Name Electrical building
Civil Photos
Main Pump Station-Civil
Electrical building
Grounds/Site Improvements
Page: 1 of 18
1191
Item # 16.

Page: 2 of 18
1192
Item # 16.

Page: 3 of 18
1193
Item # 16.

Page: 4 of 18
1194
Item # 16.

Page: 5 of 18
1195
Item # 16.

Control building
Grounds/Site Improvements
Page: 6 of 18
1196
Item # 16.

Asset Name Control building
Civil Photos
Page: 7 of 18
1197
Item # 16.

Civil Condition Score 1 - Good – No defects observed.

Civil Performance Score 1 - Good – Asset functioning as intended.

Asset Name Site civil
Condition
Performance
Site civil
Grounds/Site Improvements
Civil Field Assessment
Road/Driveway
Page: 8 of 18
1198
Item # 16.

Road/Driveway Type Asphalt Pavement
Road/Driveway Observations Fine
Erosion No
Landscaping Yes
Drainage Type Storm Drains
Drainage Observations All fine
Civil Photos
Grading
Drainage
Page: 9 of 18
1199
Item # 16.

Page: 10 of 18
1200
Item # 16.

Page: 11 of 18
1201
Item # 16.

Page: 12 of 18
1202
Item # 16.

Page: 13 of 18
1203
Item # 16.

Page: 14 of 18
1204
Item # 16.

Page: 15 of 18
1205
Item # 16.

Page: 16 of 18
1206
Item # 16.

Page: 17 of 18
1207
Item # 16.

Civil Condition Score 1 - Good – No defects observed.

Civil Performance Score 1 - Good – Asset functioning as intended.

Condition
Performance
Page: 18 of 18
1208
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
E-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Appendix E: Main Lift Station – Structural
1209
Item # 16.
1210
Item # 16.

Created 2020-02-08 00:29:05 UTC by Erik Zalkin
Updated 2020-03-12 16:27:27 UTC by Dwight Evans
Location 37.447546, -121.9228
Asset Location Main Pump Station-Struct
Asset Name Pinch Valve Vault 1
Asset Description Pinch Valve Vault (1 of 3)
Type of Structure Vault
Year Installed 2002
Material Concrete
Structural Field Assessment Corrosion of metal walls
Structural Photos
Main Pump Station-Struct
Pinch Valve Vault 1
Structural Equipment
Page: 1 of 42
1211
Item # 16.

Cold joint
Exposed rebar
Page: 2 of 42
1212
Item # 16.

Corroded lid
Structural Observation Comments None
Page: 3 of 42
1213
Item # 16.

Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Pinch Valve Vault 2
Asset Description Pinch Valve Vault (2 of 3)
Type of Structure Vault
Year Installed 2002
Material Concrete
Structural Photos
Condition
Performance
Pinch Valve Vault 2
Structural Equipment
Page: 4 of 42
1214
Item # 16.

Exposed aggregates
Structural Observation Comments Exposed aggregates
Page: 5 of 42
1215
Item # 16.

Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Pinch Valve Vault 3
Asset Description Pinch Valve Vault (3 of 3)
Type of Structure Vault
Year Installed 2002
Material Concrete
Structural Photos
Condition
Performance
Pinch Valve Vault 3
Structural Equipment
Page: 6 of 42
1216
Item # 16.

Exposed aggregates, sim to 2
Corroded metal attachment
Page: 7 of 42
1217
Item # 16.

Spalling concrete
Structural Observation Comments None
Page: 8 of 42
1218
Item # 16.

Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Mag Meter Vault
Asset Description 24'' Magnetic Meter Vault
Type of Structure Vault
Year Installed 2002
Material Concrete
Structural Field Assessment Corrosion of metal walls
Structural Photos
Condition
Performance
Mag Meter Vault
Structural Equipment
Page: 9 of 42
1219
Item # 16.

Corroded metal
Corroded metal
Page: 10 of 42
1220
Item # 16.

Does not close All the way due to expansion from corrosion Structural Observation Comments Corroded metal at hatch opening Structural Condition Score 2 - Fair – Only minor defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Venturi Meter Vault
Asset Description 36'' Venturi Meter Vault
Type of Structure Vault
Year Installed 1975
Material Concrete
Structural Field Assessment Cracks in walls
Structural Photos
Condition
Performance
Venturi Meter Vault
Structural Equipment
Page: 11 of 42
1221
Item # 16.

Page: 12 of 42
1222
Item # 16.

Structural Observation Comments No cracking inside, surface cracks on outside, coating still present on inside Condition
Page: 13 of 42
1223
Item # 16.

Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Butteryfly Valve Vault
Asset Description 36'' Butterfly Valve Vault
Type of Structure Vault
Year Installed 1997
Material Concrete
Structural Photos
Performance
Butteryfly Valve Vault
Structural Equipment
Page: 14 of 42
1224
Item # 16.

No visible cracks on inside
Structural Observation Comments No visible cracks besides on curb outside Page: 15 of 42
1225
Item # 16.

Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Electrical/Generator Building-Structural
Type of Structure Building
Year Installed 2000
Material Masonry
Structural Field Assessment Cracks in walls, Moisture issues Structural Photos
Outside, front entrance
Condition
Performance
Electrical/Generator Building-Structural
Structural Equipment
Page: 16 of 42
1226
Item # 16.

Outside, left of entrance
Cracks on left side of building, next to equipment cabinet Page: 17 of 42
1227
Item # 16.

Back side
Cracks, back side
Page: 18 of 42
1228
Item # 16.

Right side of building
Cracks inside, right side of building
Page: 19 of 42
1229
Item # 16.

Moisture inside, right side of building
TYP wall to roof connection
Page: 20 of 42
1230
Item # 16.

TYP wall to roof connection
Vertical crack in corner, crack starts from bottom and goes to the top Page: 21 of 42
1231
Item # 16.

Electrical equipment supposedly anchored, though not visible outside Page: 22 of 42
1232
Item # 16.

Roof beams
Structural Observation Comments Some cracks inside and outside, cosmetic cracks Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Fuel Tank (bulk)
Asset Description 2,000-gal UL-2085 above ground vault tank Type of Structure Tank
Year Installed 2008
Material Metal
Structural Photos
Condition
Performance
Fuel Tank (bulk)
Structural Equipment
Page: 23 of 42
1233
Item # 16.

Stainless steel anchors
Page: 24 of 42
1234
Item # 16.

Not flexible
Pipe continues inside building, underneath Grating/cover plate Page: 25 of 42
1235
Item # 16.

Connects to day tank, flexible coupling here
Structural Observation Comments None
Page: 26 of 42
1236
Item # 16.

Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Fuel Tank (day)
Type of Structure Tank
Year Installed 2000
Material Metal
Structural Photos
4 anchors
Condition
Performance
Fuel Tank (day)
Structural Equipment
Page: 27 of 42
1237
Item # 16.

Piping on one side, piping attached to wall, flexible connection for 2 lines only (2 gray pipes coming out of slab), 4 red shutoff valves
Page: 28 of 42
1238
Item # 16.

No flexible coupling here
Structural Observation Comments None
Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Control Building
Type of Structure Building
Year Installed 2008
Material Masonry
Structural Field Assessment Cracks in walls
Structural Photos
Front
Condition
Performance
Control Building
Structural Equipment
Page: 29 of 42
1239
Item # 16.

Connection to roof, from outside, vertical blocking different than what is shown on drawing
Page: 30 of 42
1240
Item # 16.

Flexible coupling
Concealed finished ceiling, have to peep thru hatch to see roof to wall connection from inside
Structural Observation Comments None
Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Grit Chamber/Inflow Structure
Type of Structure Tank
Year Installed 2008
Material Concrete
Structural Photos
Condition
Performance
Grit Chamber/Inflow Structure
Structural Equipment
Page: 31 of 42
1241
Item # 16.

Eroding of coating and concrete, color change at bottom Page: 32 of 42
1242
Item # 16.

Dirt on steel not corrosion
Structural Observation Comments Poor lighting
Page: 33 of 42
1243
Item # 16.

Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Wet Well
Type of Structure Tank
Year Installed 2008
Material Concrete
Structural Field Assessment Paint issues
Structural Photos
Building on top of wet well, entrance to wet well
Condition
Performance
Wet Well
Structural Equipment
Page: 34 of 42
1244
Item # 16.

Stair knee brace connection
Page: 35 of 42
1245
Item # 16.

Page: 36 of 42
1246
Item # 16.

Page: 37 of 42
1247
Item # 16.

Penetration on opposite side of grit chamber
Compromised coating
Page: 38 of 42
1248
Item # 16.

Structural Observation Comments Coating appears to be deteriorating towards bottom, tanks were in operation, no inspection of walls and slab below liquid line
Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Garage
Type of Structure Building
Year Installed 2008
Structural Photos
Outside, PEMB
Condition
Performance
Garage
Structural Equipment
Page: 39 of 42
1249
Item # 16.

Cracks in slab, inside view, when it rains, water propagation follows cracks (water may have come up through cracks)
Page: 40 of 42
1250
Item # 16.

TYP wind girts
Tension brace, middle bay only
Page: 41 of 42
1251
Item # 16.

Tension brace in roof, end bay only, 3 bays total
Structural Observation Comments Water accumulation inside when it’s raining, water seeps thru slab Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Condition
Performance
Page: 42 of 42
1252
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
F-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Appendix F: Venus Way Lift Station – Mechanical
1253
Item # 16.
1254
Item # 16.

Created 2020-02-07 16:27:36 PST by Erik Zalkin
Updated 2020-02-11 12:30:18 PST by Hamed Hakimelahi
Location 37.413692, -121.909061
Asset Location Venus Way-Mech
Mechanical Asset Name Pump #1
Mechanical Asset Description FLYGT CP3102-441, 5HP 3ph 230V Submersible Pump Asset Type Pump
Year Installed 2008
Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Pump #2
Mechanical Asset Description FLYGT CP3102-441, 5HP 3ph 230V Submersible Pump Asset Type Pump
Year Installed 2008
Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name Pump Guide Rails
Mechanical Asset Description Reinstalled in 2008
Year Installed 2008
Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Venus Way-Mech
Pump #1
Equipment Data
Condition
Performance
Pump #2
Equipment Data
Condition
Performance
Pump Guide Rails
Equipment Data
Condition
Performance
Page: 1 of 9
1255
Item # 16.

Mechanical Asset Name 8'' Gate Valve, Pump 1 and 2
Mechanical Asset Description 8'' Gate Valve, Pump 1 and 2 Asset Type Valve
Year Installed 2008
Mechanical Equipment Photos
Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name 8'' Gate Valve, Pump 2
Mechanical Asset Description 8'' Gate Valve, Pump 2
Asset Type Valve
Year Installed 2008
8'' Gate Valve, Pump 1 and 2
Equipment Data
Condition
Performance
8'' Gate Valve, Pump 2
Equipment Data
Page: 2 of 9
1256
Item # 16.

Mechanical Equipment Photos
Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name 8'' Gate Valve, Pump 1 and 2
Mechanical Asset Description 8'' Gate Valve, Pump 1 and 2 Asset Type Valve
Year Installed 2008
Mechanical Equipment Photos
Condition
Performance
8'' Gate Valve, Pump 1 and 2
Equipment Data
Page: 3 of 9
1257
Item # 16.

Mechanical Observation Comments None
Condition
Page: 4 of 9
1258
Item # 16.

Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name 8'' Check Valve, Pump 1
Mechanical Asset Description 8'' Check Valve, Pump 1
Asset Type Valve
Year Installed 2008
Performance
8'' Check Valve, Pump 1
Equipment Data
Page: 5 of 9
1259
Item # 16.

Mechanical Equipment Photos
Mechanical Observation Comments None
Condition
Page: 6 of 9
1260
Item # 16.

Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name 8'' Check Valve, Pump 2
Mechanical Asset Description 8'' Check Valve, Pump 2
Asset Type Valve
Year Installed 2008
Mechanical Equipment Photos
Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Mechanical Asset Name 4'' Flap Gate
Mechanical Asset Description 4'' Flap Gate in wet well
Asset Type Valve
Performance
8'' Check Valve, Pump 2
Equipment Data
Condition
Performance
4'' Flap Gate
Equipment Data
Page: 7 of 9
1261
Item # 16.

Year Installed 2008
Mechanical Field Assessment Could bot find
Mechanical Observation Comments None
Mechanical Condition Score NA - Not enough information available.

Mechanical Performance Score NA - Not enough information available.

Mechanical Asset Name 2'' Combo Air/vacuum valve
Mechanical Asset Description 2'' Combo Air/vacuum valve Asset Type Valve
Year Installed 2008
Mechanical Equipment Photos
Condition
Performance
2'' Combo Air/vacuum valve
Equipment Data
Page: 8 of 9
1262
Item # 16.

Mechanical Observation Comments None
Mechanical Condition Score 1 - Good – No defects observed.

Mechanical Performance Score 1 - Good – Asset functioning as intended.

Condition
Performance
Page: 9 of 9
1263
Item # 16.
1264
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
G-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Appendix G: Venus Way Lift Station – Electrical
1265
Item # 16.
1266
Item # 16.

Created 2020-02-08 00:26:11 UTC by Erik Zalkin
Updated 2020-02-22 00:00:26 UTC by Sundara Palani
Location 37.413686, -121.909069
Asset Location Venus Way-Elec
Electrical Asset Name Utility Transformer
Electrical Asset Description 240/120 V, 3-Ph, 3 W
Asset ID XFMR T-1
Electrical Asset Type Transformer
Year Installed 2000
Age 20 Years
Manufacturer PG&E Owned
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels NA
Number of Available Spares and Spaces NA
Electrical Equipment Photos
Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Venus Way-Elec
Utility Transformer
Electrical Equipment
Electrical Equipment Observations
Page: 1 of 5
1267
Item # 16.

Electrical Equipment Performance Score 1 - Component Functioning as Intended Electrical Asset Name Service Pedestal
Electrical Asset Description Service Disconnect and Metering Year Installed 2008
Electrical Asset Name Pump Control Panel
Electrical Asset Description Starter panel for Pumps #1 and 2 (Each 5 HP) Electrical Asset Type Panel
Year Installed 2008
Age 12 Years
Electrical Enclosure Condition Good Condition
Electrical Heat Release Normal
Electrical Arcflash Labels Missing
Number of Available Spares and Spaces NA
Electrical Equipment Photos
Service Pedestal
Pump Control Panel
Electrical Equipment
Electrical Equipment Observations
Page: 2 of 5
1268
Item # 16.

Page: 3 of 5
1269
Item # 16.

Page: 4 of 5
1270
Item # 16.

Electrical Equipment Observations No Corrosion Noted
Electrical Equipment Condition Score 1 - Excellent
Electrical Equipment Performance Score 1 - Component Functioning as Intended Page: 5 of 5
1271
Item # 16.
1272
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
H-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Appendix H: Venus Way Lift Station – Instrumentation
1273
Item # 16.
1274
Item # 16.

Created 2020-02-07 16:27:21 PST by Erik Zalkin
Updated 2020-02-14 15:32:15 PST by Erik Zalkin
Location 37.413684, -121.909056
Asset Location Venus Way-Instr
Asset Name Level Instrument
Asset Description Wet Well Level Sensor
Asset ID LSHH-01
Asset Type Level Switch
Year Installed 2008
Instrumentation Observation Comments Did not obtain photo; see wet well photos (mechanical) Instrumentation Condition Score 1 - Good – No defects observed.

Instrumentation Performance Score 1 - Good – Asset functioning as intended.

Venus Way-Instr
Level Instrument, LSHH-01
Condition
Performance
Page: 1 of 1
1275
Item # 16.
1276
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
I-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Appendix I: Venus Way Lift Station – Civil
1277
Item # 16.
1278
Item # 16.

Created 2020-02-07 16:26:57 PST by Erik Zalkin
Updated 2020-02-11 12:30:21 PST by Hamed Hakimelahi
Location 37.413677, -121.909062
Asset Location Venus Way-Civil
Asset Name Site civil
Civil Photos
Venus Way-Civil
Site civil
Grounds/Site Improvements
Page: 1 of 5
1279
Item # 16.

Page: 2 of 5
1280
Item # 16.

Page: 3 of 5
1281
Item # 16.

Civil Condition Score 1 - Good – No defects observed.

Condition
Page: 4 of 5
1282
Item # 16.

Civil Performance Score 1 - Good – Asset functioning as intended.

Performance
Page: 5 of 5
1283
Item # 16.
1284
Item # 16.

City of Milpitas – Sewer Master Plan
Main and Venus Way Lift Station Inspections Report
J-1
DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.

Lift Station Inspections Report v1d REV changes from inspection team review.docx Appendix J: Venus Way Lift Station – Structural
1285
Item # 16.
1286
Item # 16.

Created 2020-02-07 16:27:46 PST by Erik Zalkin
Updated 2020-03-12 14:47:14 PDT by Erik Zalkin
Location 37.413696, -121.909065
Asset Location Venus Way-Struct
Asset Name Wet Well
Asset Description 72" Diameter Reinforced Concrete Pipe Type of Structure Tank
Year Installed 1964
Material Concrete
Structural Photos
Venus Way-Struct
Wet Well
Structural Equipment
Page: 1 of 6
1287
Item # 16.

Oxidation
Structural Observation Comments None
Page: 2 of 6
1288
Item # 16.

Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Valve Vault
Type of Structure Vault
Year Installed 1994
Material Concrete
Structural Photos
Condition
Performance
Valve Vault
Structural Equipment
Page: 3 of 6
1289
Item # 16.

Structural Observation Comments None
Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Aluminum Hatch-Vault
Asset Description Aluminum Hatch, slide-in
Type of Structure Vault
Year Installed 2008
Condition
Performance
Aluminum Hatch-Vault
Structural Equipment
Page: 4 of 6
1290
Item # 16.

Structural Photos
Structural Observation Comments None
Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Asset Name Aluminum Hatch-Wet Well
Asset Description Aluminum Hatch w/ safety grate
Type of Structure Vault
Year Installed 2008
Material Metal
Condition
Performance
Aluminum Hatch-Wet Well
Structural Equipment
Page: 5 of 6
1291
Item # 16.

Structural Photos
Structural Observation Comments None
Structural Condition Score 1 - Good – No defects observed.

Structural Performance Score 1 - Good – Asset functioning as intended.

Condition
Performance
Page: 6 of 6
1292
Item # 16.
1293
Item # 16.
www.hydroscience.com

APPENDIX B
City of Milpitas
Sewer Master Plan Study
Milpitas Sewer Flow Monitoring Report 2019-2020
1294
Item # 16.
www.hydroscience.com

THIS PAGE INTENTIONALLY LEFT BLANK

1295
Item # 16.

Milpitas Sewer Flow
Monitoring Service 2019-2020
November 16, 2019 – March 09, 2020
Final Report Submitted to:

City of Milpitas
April 17, 2020
1296
Item # 16.

Home Page
Milpitas Sewer Flow Monitoring Service
2019 - 2020
Prepared for:

Theodore Alicante
City of Milpitas
455 E. Calaveras Boulevard
Milpitas, CA 95035
Prepared by:

ADS, LLC
15201 Springdale Street
Huntington Beach, CA 92649
1297
Item # 16.

Letter of Transmittal
ADSLLC
April 17, 2020
Theodore Alicante
City of Milpitas
455 E. Calaveras Boulevard
Milpitas, CA 95035
SUBJECT: Milpitas Sewer Flow Monitoring Service 2019 - 2020 Dear Theodore,
ADS is pleased to submit the report for the Milpitas Sewer Flow Monitoring Service 2019 - 2020 conducted on behalf of the City of Milpitas. The metering was contracted for ninety (90) days at twenty-three (23) flow monitor and two (2) rain rauge locations. The study period is November 16, 2019 - March 09, 2020. All available data has been provided.

The report contains hourly averaged depth, velocity, and quantity hydrographs as well as daily long tables for the metering period in pdf format. Depth, quantity, and velocity entities for each monitoring location have been provided on Prism.

In addition, we would be happy to further explain any details about the report that may seem unclear. Should you have any questions or comments, you may contact the Project Manager, Paul Mitchell at (714) 379-9778 ext 223.

It has been our pleasure to serve you in the performance of this project. Thank you for choosing ADS products and services to meet your flow monitoring needs.

Sincerely,

ADS ENVIRONMENTAL SERVICES
Mackenzie Michaud
Data Analyst
1 1298
Item # 16.

Scope and Methodology
Introduction
City of Milpitas entered into an agreement with ADS Environmental Services to conduct flow monitoring at twenty-three (23) metering points in the City of Milpitas Collection System. The study was conducted over a ninety (90) day period. The study period is November 16, 2019 - March 09, 2020. The primary objective of the monitoring was to determine current flows for wet weather planning purposes.

Project Scope
The scope of this study involved using flow monitors to quantify wastewater flows at the designated locations.

Specifically, the study included the following key components. • Investigate the proposed flow-monitoring sites for adequate hydraulic conditions. • Flow monitor installations.
• Flow monitor confirmations and data collections.
• Flow data analysis.

Equipment installation was completed on November 15, 2019. The study period began on November 16, 2019 and was completed on March 09, 2020 .

Flow Monitoring Equipment
The ADS FlowShark Triton monitor was selected for this project. This flow monitor is an area velocity flow monitor that uses both the Continuity and Manning's equations to measure flow.

The ADS FlowShark Triton monitor consists of data acquisition sensors and a battery-powered microcomputer. The microcomputer includes a processor unit, data storage, and an on-board clock to control and synchronize the sensor recordings. The monitor was programmed to acquire and store depth of flow and velocity readings at 5-minute intervals.

The FS Triton monitor features cross-checking using multiple technologies in each sensor for continuous running of comparisons and tolerances. The FS Triton monitor can support two (2) sets of sensors. The sensor option used for this project was:

The Peak Combo Sensor installed at the bottom of the pipe includes three types of data acquisition technologies.

The up looking ultrasonic depth uses sound waves from two independent transceivers to measure the distance from the sensor upward toward the flow surface; applying the speed of sound in the water and the temperature measured by sensor to calculate depth.

The pressure depth is calculated by using a piezo-resistive crystal to determine the difference between hydrostatic and atmospheric pressure. The pressure sensor is temperature compensated and vented to the atmosphere through a 2 1299
Item # 16.
desiccant filled breather tube.

To obtain peak velocity, the sensor sends an ultrasonic signal at an angle upward through the widest cross-section of the oncoming flow. The signal is reflected by suspended particles, air bubbles, or organic matter with a frequency shift proportional to the velocity of the reflecting objects. The reflected signal is received by the sensor and processed using digital spectrum analysis to determine the peak flow velocity.

Installation
Installation of flow monitoring equipment typically proceeds in four steps. First, the site is investigated for safety and to determine physical and hydraulic suitability for the flow monitoring equipment. Second, the equipment is physically installed at the selected location. Third, the monitor is tested to assure proper operation of the velocity and depth of flow sensors and verify that the monitor clock is operational and synchronized to the master computer clock. Fourth, the depth and velocity sensors are confirmed and line confirmations are performed.

In pipes up to 42 inches in diameter, the sensors were mounted on expandable stainless steel rings, inserted at least a foot upstream into influent pipes and tightened against the inside walls of the pipes. Influent pipe installations reduce the influences of turbulence and backwater often caused by changes in channel geometry in manholes. 3 1300
Item # 16.

Data Collection, Confirmation, and Quality Assurance
Data collects were done remotely via wireless connect on a weekly basis via ADS Field Representatives. During the monitoring period, field crews visit each monitoring location to verify proper monitor operation and document field conditions. The following quality assurance steps are taken to assure the integrity of the collected data:

Measure power supplies: monitors were powered by dry cell battery packs. Voltages were recorded and battery packs replaced, as necessary. Separate batteries provided back-up power to memory allowing primary batteries to be replaced without loss of data.

Clock synchronization: Field crews synchronized monitor clocks to master clocks.

Confirm depth and velocity readings: Field crews descended into meter manholes to manually measure depths and velocities and compare them meter readings to confirm that they agreed. They also measured silt levels, if any, in the inverts of the pipes. Silt areas were subtracted from flow areas to compute true areas of flow.

Confirm average velocities through cross-sectional velocity profiles: Since ADS velocity sensors measure peak velocity, field crews collected cross-sectional velocity profiles in order to develop a relationship between peak and average velocity in lines that meet the hydraulic criteria.

Upload and Review Data: Data collected from the monitors were uploaded and reviewed by a Data Analyst for completeness, outliers and deviations in the flow patterns, which indicate system anomalies or equipment failure.

Flow Quantification Methods
There are two main equations used to measure open channel flow: the Continuity Equation and the Manning Equation. The Continuity Equation, which is considered the most accurate, can be used if both depth of flow and velocity are available. In cases where velocity measurements are not available or not practical to obtain, the Manning Equation can be used to estimate velocity from the depth data based on certain physical characteristics of the pipe (i.e. the slope and roughness of the pipe being measured). However, the Manning equation assumes uniform, steady flow hydraulic conditions with non-varying roughness, which are typically invalid assumptions in most sanitary sewers. The Continuity Equation was used exclusively for this study.

Continuity Equation
The Continuity Equation states that the flow quantity (Q) is equal to the wetted area (A) multiplied by the average velocity (V) of the flow.

Q = A * V
This equation is applicable in a variety of conditions including backwater, surcharge, and reverse flow.

Data Analysis and Presentation
Data Analysis
A flow monitor is typically programmed to collect data at either 15-minute or 5-minute intervals throughout the monitoring period. The monitor stores raw data consisting of (1) the ultrasonic depth, (2) the peak velocity and (3) the pressure depth. The data is imported into ADS's proprietary software and is examined by a data analyst to verify its integrity. The data analyst also reviews the daily field reports and site visit records to identify conditions that would affect the collected data.

Velocity profiles and the line confirmation data developed by the field personnel are reviewed by the data analyst to 4 1301
Item # 16.
identify inconsistencies and verify data integrity. Velocity profiles are reviewed and an average to peak velocity ratio is calculated for the site. This ratio is used in converting the peak velocity measured by the sensor to the average velocity used in the Continuity equation. The data analyst selects which depth sensor entity will be used to calculate the final depth information. Silt levels present at each site visit are reviewed and representative silt levels established.

Occasionally the velocity sensor's performance may be compromised resulting in invalid readings sporadically during the monitoring period. This is generally caused by excessive debris (silt) blocking the sensor's crystals, shallow flows (~< 1") that may drop below the top of the sensor or very clear flows lacking the particles needed to measure rate. In order to use the Continuity equation to quantify the flow during these periods, a Data Analyst and/or Engineer will use the site's historical pipe curve (depth vs. velocity) data along with valid field confirmations to reconstitute and replace the false velocity recordings with expected velocity readings for a given historical depth along the curve.

Selections for the above parameters can be constant or can change during the monitoring period. While the data analysis process is described in a linear manner, it often requires an iterative approach to accurately complete.

Data Presentation
This type of flow monitoring project generates a large volume of data. To facilitate review of the data, results have been provided in graphical and tabular formats. The flow data is presented graphically in the form of scattergraphs and hydrographs. Hydrographs are based on 5-minute averaging. Tables are provided in daily average format. These tables show the flow rate for each day, along with the daily minimum and maximums, the times they were observed, the total daily flow, and total flow for the month (or monitoring period). The following explanation of terms may aid in interpretation of the tables and hydrographs.

DEPTH - Final calculated depth measurement (in inches)
QUANTITY - Final calculated flow rate (in MGD)
VELOCITY - Final calculated flow velocity (in feet per second) REPORT TOTAL - Total volume of flow recorded for the indicated time period (in MG) 5 1302
Item # 16.

Site Commentary
Site Information
MIL_0041
Pipe Dimensions 23
Silt Level 0.00"
Overview
Site MIL_0041 functioned under normal conditions during the period Saturday, November 16, 2019 to Monday, March 9, 2020 . This site exhibited an observable response to the wet weather events of November 26, 2019 - November 27, 2019, December 7, 2019 - December 8, 2019, and January 16, 2020 - January 17, 2020. Review of the scattergraph shows that both free flow and mild backwater flows were recorded during the study period.

Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted to date and support the relative accuracy of the flow monitor at this location.

Observations
Average flow depth, velocity, and quantity data observed during Saturday, November 16, 2019 to Monday, March 9, 2020 , along with observed minimum and maximum data, are provided in the following table.

Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 6.51 1.54 0.709
Minimum 3.96 0.73 0.178
Maximum 9.42 2.30 1.647
Time of Minimum 2/1/2020 5:05 AM 3/2/2020 3:25 AM 1/7/2020 5:20 AM Time of Maximum 2/26/2020 8:40 AM 2/1/2020 12:40 PM 2/1/2020 12:40 PM Data Quality
Data uptime observed during the Saturday, November 16, 2019 to the Monday, March 9, 2020 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.

Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
6 1303
Item # 16.

Latitude: 37.418531°
Longitude: -121.904896°
Site Sketch Profile View or Photo
Sensor Shot
22431.11.325
Additional Site Info. / Comments:

ADS Project Name:

ADS Project Number:

Milpitas.WWTFM.CA2019-2020
Wireless
Pipe Material
Antenna Location
Communication Information:

Drilled Pavement / Concrete
No
Concrete
Unbolted Normal
Good
Active Drop Connections Air Quality:

Communication Type
Normal
26'' 54''
Manhole Cover Manhole Frame
Pipe Condition:

Manhole Material:

Manhole Diameter (Approx.):

Manhole Depth (Approx. FT): Manhole Configuration
Concrete Good
7'
Manhole Condition:

Upstream 0-5 FT Manhole
Sensors / Devices:

Installation Confirmation:

Manhole Opening Diameter (in)
Silt Type
Hydraulic Comments:
0''
Single

0.25"
Manhole / Pipe Information:

Pressure Sensor Range (psi)
Confirmation Time:

Peak Combo (CS4)
Pipe Size (HxW)

0.0"
Downlooker Physical Offset (in) Measurement Confidence (in) NA
Peak Velocity (fps)
Silt (in)
5:37:00 AM 23.00"x23.50"
Smooth flow with medium depth and moderate velocity
0 - 5 psi
Depth of Flow (Wet DOF) (in) Range (Air DOF) (in)

5.50"
Velocity Sensor Offset (in)

1.40'
Installation Information
Circular
Monitor Series
Monitor Location:

Doppler Standard Ring and Crank
Manhole #
Installation Date:

Pipe Size (H x W)
Topside / Area Photo
Thursday, November 14, 2019
Access
Temporary

23.00"x23.50"
Traffic
#0041 Residential/Commercial
Map
Installation Type:

Monitoring Location (Sensors):

MIL_0041
TRITON+
System Characteristics
Location Type
Pipe Shape DRIVE.

Milpitas Temp Study 2019-20
Drive Medium
Site Access Details:

Site Address /Location:

Site Name
S Abel St and Curtis Ave, Milpitas, CA
Flow Monitoring
Site Report
Outlet
West
Inlet East
(Sensor Location)
Inlet North
7 1304
Item # 16.
8 1305
Item # 16.
9 1306
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 11/16/2019 05:15 4.62 12:05 7.88 6.62 05:25 0.88 11:25 1.93 1.52 05:25 0.241 11:25 1.094 0.726 0.726 11/17/2019 05:20 4.67 11:25 8.34 6.52 05:20 0.97 11:25 1.95 1.56 05:20 0.270 11:25 1.217 0.723 0.723 11/18/2019 04:15 4.15 08:30 7.55 6.01 03:05 0.85 08:15 1.83 1.47 04:05 0.210 08:15 0.985 0.608 0.608 11/19/2019 04:55 4.19 08:20 7.48 5.96 04:55 0.88 08:15 1.91 1.46 04:55 0.208 08:15 1.027 0.596 0.596 11/20/2019 04:15 4.19 08:35 7.39 5.98 05:40 0.79 08:30 1.81 1.40 04:35 0.196 08:30 0.954 0.575 0.575 11/21/2019 04:25 4.31 08:30 7.43 6.00 05:10 0.80 11:05 1.80 1.40 05:10 0.205 08:30 0.900 0.575 0.575 11/22/2019 05:15 4.66 08:55 7.07 5.95 03:35 0.81 08:40 1.78 1.43 03:35 0.226 08:40 0.879 0.576 0.576 11/23/2019 05:00 4.37 11:55 7.48 6.29 04:45 0.88 10:40 1.81 1.43 04:45 0.225 12:10 0.942 0.630 0.630 11/24/2019 04:45 4.02 12:40 7.30 6.19 06:05 1.01 17:25 1.81 1.48 04:45 0.232 12:30 0.935 0.644 0.644 11/25/2019 05:15 4.66 09:10 7.50 6.34 05:15 0.79 20:50 1.71 1.39 05:15 0.219 09:15 0.919 0.616 0.616 11/26/2019 04:20 4.70 12:15 8.19 6.41 04:20 0.81 20:35 1.95 1.52 04:20 0.227 12:20 1.088 0.682 0.682 0.36 11/27/2019 05:15 5.22 09:50 7.91 6.72 02:25 1.16 10:15 1.83 1.58 05:15 0.388 10:10 1.047 0.746 0.746 0.63 11/28/2019 06:40 5.31 12:10 7.83 6.58 05:05 1.05 10:45 1.87 1.52 05:05 0.353 12:05 1.052 0.699 0.699 11/29/2019 05:00 5.46 12:00 7.46 6.63 04:45 1.08 11:35 1.88 1.57 04:45 0.375 11:35 0.998 0.729 0.729 0.02 11/30/2019 05:40 5.20 13:30 7.97 6.83 05:10 0.99 12:35 1.83 1.51 05:10 0.320 12:35 1.066 0.737 0.737 0.10 12/01/2019 05:40 5.70 11:20 8.27 7.25 05:30 0.95 13:35 1.81 1.37 05:40 0.349 13:35 1.088 0.725 0.725 0.06 12/02/2019 04:40 5.80 09:10 7.62 6.59 05:10 0.94 08:45 2.00 1.57 05:10 0.357 08:45 1.080 0.719 0.719 0.30 12/03/2019 04:55 4.79 08:35 7.45 6.30 04:15 1.31 22:25 1.94 1.66 04:15 0.380 08:45 1.018 0.719 0.719 0.01 12/04/2019 03:10 5.10 08:40 7.65 6.44 03:15 1.34 08:45 1.96 1.69 03:15 0.420 08:45 1.089 0.749 0.749 0.39 12/05/2019 04:55 4.93 08:35 7.69 6.41 02:40 1.25 08:15 1.91 1.63 04:50 0.384 09:10 1.046 0.723 0.723 0.01 12/06/2019 04:20 4.94 09:00 7.58 6.37 05:10 1.17 20:00 1.87 1.61 05:10 0.351 08:45 1.014 0.705 0.705 0.01 12/07/2019 05:10 4.91 18:40 8.25 6.63 04:30 1.25 12:05 2.08 1.70 04:30 0.376 18:40 1.266 0.795 0.795 0.67 12/08/2019 06:00 5.35 12:25 7.84 6.84 05:25 1.28 13:35 1.97 1.70 05:25 0.433 13:35 1.083 0.822 0.822 0.20 12/09/2019 04:55 5.30 08:50 7.64 6.59 02:20 1.35 23:05 1.92 1.68 04:45 0.468 23:05 1.041 0.767 0.767 12/10/2019 04:10 5.03 09:05 7.79 6.55 04:05 1.22 23:30 2.03 1.64 04:10 0.377 08:40 1.086 0.747 0.747 12/11/2019 04:45 5.11 08:45 7.68 6.43 04:20 1.32 12:20 1.93 1.67 04:45 0.418 08:50 1.060 0.740 0.740 0.03 12/12/2019 04:20 5.10 08:45 7.84 6.55 04:10 1.39 20:55 2.03 1.72 04:20 0.438 08:55 1.152 0.782 0.782 0.01 12/13/2019 05:05 5.27 08:45 7.93 6.72 04:45 1.32 09:40 2.01 1.68 04:45 0.437 09:40 1.150 0.791 0.791 0.01 12/14/2019 05:00 5.51 13:30 8.30 7.22 05:00 1.42 10:45 2.05 1.70 05:00 0.498 10:45 1.202 0.890 0.890 0.01 12/15/2019 05:20 5.43 11:10 8.56 6.91 04:35 1.32 11:15 2.01 1.69 05:20 0.455 11:15 1.269 0.830 0.830 0.01 12/16/2019 04:40 5.08 08:35 7.61 6.38 05:10 1.19 10:10 1.85 1.61 05:10 0.372 08:30 0.990 0.705 0.705 0.01 12/17/2019 04:25 5.04 08:50 7.62 6.40 03:35 1.11 21:45 1.90 1.58 03:55 0.345 09:05 0.993 0.698 0.698 0.01 12/18/2019 04:45 5.02 09:00 7.65 6.39 05:00 1.11 22:00 1.89 1.57 05:00 0.343 08:55 1.001 0.694 0.694 0.01 12/19/2019 04:30 4.75 09:05 7.28 6.19 04:20 1.11 08:55 1.93 1.60 04:20 0.318 08:55 0.997 0.677 0.677 12/20/2019 04:55 4.61 09:35 7.61 6.29 03:30 1.15 09:30 1.83 1.59 04:50 0.323 09:30 1.004 0.690 0.690 12/21/2019 05:25 4.85 12:10 7.56 6.46 04:20 1.17 11:15 1.91 1.57 05:20 0.346 11:15 1.012 0.708 0.708 0.01 12/22/2019 04:25 5.21 13:25 7.83 6.75 04:20 1.23 13:10 1.87 1.58 04:20 0.400 13:10 1.067 0.754 0.754 0.41 12/23/2019 06:15 5.50 13:10 8.75 6.92 06:30 1.23 14:40 2.11 1.64 06:15 0.433 13:10 1.357 0.814 0.814 12/24/2019 04:55 5.36 11:55 7.50 6.69 04:50 1.06 13:55 1.77 1.47 04:55 0.358 13:05 0.945 0.691 0.691 0.02 12/25/2019 04:45 5.54 11:35 7.38 6.52 05:10 1.06 11:35 1.74 1.42 05:10 0.375 11:35 0.916 0.642 0.642 0.08 12/26/2019 04:45 5.46 12:50 7.47 6.76 04:10 1.06 12:05 1.81 1.46 05:25 0.373 12:05 0.966 0.698 0.698 12/27/2019 04:05 5.79 12:25 7.49 6.84 04:05 1.17 12:10 1.79 1.50 04:05 0.442 12:10 0.954 0.722 0.722 12/28/2019 05:00 5.54 12:20 7.94 6.87 04:25 0.97 12:25 1.85 1.47 04:25 0.348 12:25 1.076 0.723 0.723 12/29/2019 06:10 5.64 12:40 8.04 7.02 05:10 1.00 12:10 1.83 1.49 05:10 0.364 12:10 1.083 0.759 0.759 0.22 12/30/2019 05:15 5.67 10:50 7.96 6.85 05:05 1.00 12:00 2.04 1.61 05:05 0.365 12:00 1.086 0.785 0.785 12/31/2019 04:25 4.83 11:15 7.71 6.53 03:55 1.16 11:10 1.97 1.67 04:20 0.345 11:10 1.102 0.763 0.763 0.01 Daily Tabular Report
Daily Tabular Report For The Period 11/16/2019 00:00 - 03/09/2020 23:59 MIL_0041, Pipe Height: 23.00 in, Silt: 0.00 in
10 1307
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 01/01/2020 06:25 4.93 13:00 7.65 6.43 06:00 1.10 13:00 1.96 1.60 06:20 0.332 13:00 1.088 0.719 0.719 01/02/2020 05:05 4.24 09:50 7.29 5.99 05:05 1.03 09:35 1.93 1.56 05:05 0.250 09:40 0.995 0.637 0.637 01/03/2020 04:10 4.22 09:55 7.20 5.95 05:00 0.92 09:50 1.86 1.52 05:00 0.220 09:50 0.943 0.618 0.618 01/04/2020 05:30 4.08 13:20 7.48 5.97 05:45 0.93 13:35 1.90 1.49 05:30 0.213 13:35 1.021 0.617 0.617 01/05/2020 05:25 4.14 11:15 7.37 6.08 05:30 0.83 20:35 1.94 1.51 05:30 0.196 12:55 0.981 0.645 0.645 01/06/2020 05:15 4.07 08:45 7.21 5.83 04:25 0.90 08:50 1.85 1.43 05:15 0.204 08:50 0.938 0.566 0.566 01/07/2020 04:30 4.21 08:50 7.25 5.93 05:20 0.73 09:20 1.82 1.38 05:20 0.178 09:00 0.918 0.564 0.564 01/08/2020 03:55 4.51 08:45 7.34 6.12 03:55 0.95 08:30 1.91 1.51 03:55 0.249 08:35 0.988 0.635 0.635 0.02 01/09/2020 04:50 4.53 08:50 7.52 6.14 03:55 1.07 08:25 1.90 1.54 03:55 0.286 08:50 1.022 0.647 0.647 0.18 01/10/2020 05:05 4.95 08:40 7.35 6.21 04:05 1.01 08:40 1.85 1.54 05:05 0.305 08:40 0.969 0.655 0.655 0.02 01/11/2020 05:30 4.65 12:40 7.60 6.39 05:15 1.13 11:45 1.92 1.58 05:15 0.314 11:45 1.033 0.706 0.706 0.01 01/12/2020 05:10 5.10 13:25 7.90 6.73 05:40 1.07 12:45 1.91 1.57 05:40 0.336 12:45 1.082 0.753 0.753 01/13/2020 04:10 5.05 08:15 7.91 6.33 05:00 1.05 09:10 1.99 1.62 05:00 0.328 09:10 1.077 0.703 0.703 0.02 01/14/2020 05:10 4.78 08:55 7.56 6.29 04:50 1.17 08:00 1.94 1.60 04:50 0.338 08:55 1.044 0.690 0.690 0.11 01/15/2020 04:20 4.96 08:50 7.82 6.52 04:00 1.01 08:10 1.90 1.52 04:00 0.308 08:40 1.061 0.696 0.696 0.07 01/16/2020 05:15 4.98 21:30 7.71 6.70 03:10 1.04 08:20 2.00 1.57 04:05 0.320 08:20 1.102 0.747 0.747 0.66 01/17/2020 05:10 5.60 08:45 8.05 6.90 04:25 1.19 09:15 1.87 1.60 04:25 0.431 09:15 1.109 0.785 0.785 01/18/2020 05:10 5.54 11:35 8.13 6.95 05:00 1.19 10:30 1.93 1.64 05:00 0.423 11:35 1.137 0.815 0.815 01/19/2020 05:20 5.61 12:45 8.09 7.03 05:00 1.20 12:25 1.97 1.64 05:00 0.435 12:25 1.175 0.827 0.827 01/20/2020 05:15 5.67 16:15 8.32 7.24 05:10 1.21 20:05 2.02 1.67 05:10 0.443 20:05 1.214 0.878 0.878 01/21/2020 04:25 5.72 08:50 8.43 7.21 02:55 1.24 10:25 2.05 1.68 04:20 0.470 09:00 1.224 0.877 0.877 01/22/2020 05:10 5.69 08:55 8.40 7.11 04:00 1.19 08:55 2.00 1.65 04:00 0.441 08:55 1.261 0.843 0.843 0.03 01/23/2020 04:15 5.29 08:45 8.43 6.88 03:55 1.08 08:40 2.00 1.57 03:55 0.358 08:40 1.264 0.771 0.771 01/24/2020 04:50 5.32 09:45 8.45 6.87 03:50 1.08 09:35 1.98 1.54 05:00 0.364 09:35 1.247 0.755 0.755 01/25/2020 05:50 4.98 11:50 7.98 6.71 05:45 0.97 11:45 1.98 1.53 05:45 0.297 11:45 1.162 0.736 0.736 01/26/2020 04:55 4.98 12:10 8.07 6.83 04:50 1.00 12:40 1.91 1.55 04:50 0.303 12:40 1.125 0.765 0.765 0.16 01/27/2020 04:20 4.95 08:40 7.98 6.44 05:20 0.95 09:10 1.90 1.46 05:20 0.288 09:10 1.098 0.659 0.659 01/28/2020 04:00 4.76 08:50 7.68 6.20 04:10 0.95 08:45 1.86 1.45 04:05 0.273 08:45 1.037 0.618 0.618 0.01 01/29/2020 04:20 4.40 08:40 7.37 5.94 04:25 0.81 08:35 1.87 1.44 04:25 0.205 08:35 0.985 0.584 0.584 01/30/2020 05:05 4.11 09:00 7.30 5.92 05:05 0.87 08:25 1.93 1.41 05:05 0.201 09:15 0.966 0.572 0.572 01/31/2020 05:15 4.48 08:30 7.35 5.81 05:10 0.86 08:35 1.88 1.45 05:10 0.224 08:35 0.985 0.566 0.566 02/01/2020 05:05 3.96 12:40 9.25 6.29 04:40 0.87 12:40 2.30 1.56 04:55 0.191 12:40 1.647 0.714 0.714 02/02/2020 06:00 5.04 12:40 8.45 6.90 04:50 1.11 20:10 2.04 1.65 04:50 0.343 12:00 1.266 0.828 0.828 02/03/2020 04:10 4.56 08:40 8.31 6.47 05:00 0.96 08:50 2.02 1.58 05:00 0.264 08:50 1.250 0.728 0.728 02/04/2020 04:05 4.23 09:00 8.06 6.25 04:50 0.97 09:20 2.06 1.61 04:50 0.236 08:40 1.214 0.707 0.707 02/05/2020 03:45 4.37 08:55 8.14 6.26 05:00 0.96 08:45 2.13 1.58 05:00 0.243 08:50 1.279 0.694 0.694 02/06/2020 03:45 4.08 08:40 8.23 6.35 04:35 1.08 08:15 2.08 1.61 03:45 0.248 08:25 1.262 0.725 0.725 02/07/2020 03:50 4.23 08:55 8.30 6.39 04:00 0.98 08:30 1.96 1.60 04:00 0.250 08:55 1.202 0.722 0.722 02/08/2020 05:15 4.07 13:00 7.64 6.20 05:35 0.97 12:45 2.06 1.62 05:35 0.224 12:50 1.128 0.709 0.709 02/09/2020 04:45 4.30 12:15 7.75 6.34 07:10 1.02 12:25 2.01 1.65 04:45 0.263 12:25 1.137 0.741 0.741 02/10/2020 04:05 4.43 08:35 7.57 6.02 05:00 0.98 08:25 2.01 1.55 05:00 0.252 08:25 1.095 0.638 0.638 02/11/2020 04:35 4.33 10:30 7.60 6.03 04:10 1.02 10:30 2.02 1.54 04:10 0.260 10:30 1.108 0.639 0.639 02/12/2020 04:50 4.48 08:35 8.01 6.15 04:15 0.96 08:05 1.91 1.50 04:15 0.252 08:40 1.117 0.642 0.642 02/13/2020 04:30 4.78 09:00 7.96 6.47 04:10 0.84 08:10 1.90 1.37 04:10 0.242 08:10 1.090 0.627 0.627 02/14/2020 05:10 5.02 08:45 8.19 6.87 04:15 0.83 09:00 1.68 1.31 04:15 0.258 09:00 1.020 0.645 0.645 02/15/2020 04:35 4.27 12:35 7.50 6.23 06:00 1.02 12:15 2.02 1.64 06:00 0.257 12:15 1.063 0.712 0.712 02/16/2020 05:10 3.99 12:10 7.74 6.22 06:05 1.02 12:00 2.00 1.59 05:10 0.231 12:00 1.121 0.699 0.699 02/17/2020 05:10 4.39 11:35 7.68 6.46 04:40 1.00 10:05 1.96 1.58 04:40 0.257 10:05 1.088 0.728 0.728 02/18/2020 05:00 4.52 09:15 7.87 6.33 04:55 1.02 09:15 1.96 1.54 04:55 0.269 09:15 1.128 0.681 0.681 02/19/2020 04:10 4.73 08:55 8.11 6.40 05:10 1.04 08:45 1.93 1.55 05:10 0.297 08:50 1.151 0.695 0.695 02/20/2020 05:00 4.46 09:05 7.88 6.20 04:00 1.05 08:30 2.01 1.58 04:00 0.276 09:00 1.142 0.680 0.680 02/21/2020 04:15 4.77 09:25 8.37 6.69 03:45 1.05 09:30 1.85 1.60 03:45 0.304 09:30 1.155 0.761 0.761 02/22/2020 05:40 5.03 11:25 8.11 6.88 04:40 0.88 11:20 1.80 1.41 04:40 0.273 11:20 1.077 0.702 0.702 02/23/2020 05:40 4.84 12:55 8.41 7.11 04:25 0.86 12:45 1.77 1.37 04:25 0.260 12:45 1.114 0.720 0.720 02/24/2020 03:40 5.07 09:00 8.91 7.24 04:15 0.80 09:05 1.74 1.24 04:15 0.253 09:05 1.182 0.663 0.663 11 1308
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 02/25/2020 04:15 5.23 08:45 9.10 7.45 05:00 0.76 08:45 1.54 1.25 05:00 0.250 08:45 1.083 0.695 0.695 02/26/2020 04:25 5.32 08:40 9.42 7.39 04:30 0.78 22:50 1.78 1.28 04:30 0.261 08:15 1.106 0.696 0.696 02/27/2020 04:40 4.39 08:40 7.99 6.36 03:10 0.93 08:10 1.87 1.41 03:10 0.249 08:35 1.082 0.624 0.624 02/28/2020 04:35 4.79 08:50 8.04 6.54 03:40 0.86 08:20 1.78 1.37 03:40 0.252 08:45 1.045 0.633 0.633 02/29/2020 05:15 4.88 11:55 8.11 6.79 06:10 0.86 11:55 1.77 1.39 06:10 0.255 11:55 1.061 0.682 0.682 03/01/2020 05:35 4.76 11:05 8.19 6.93 04:55 0.79 11:00 1.80 1.40 04:55 0.232 11:00 1.089 0.715 0.715 03/02/2020 04:50 4.86 08:40 8.48 6.34 03:25 0.73 09:00 1.95 1.47 03:25 0.222 09:00 1.101 0.650 0.650 03/03/2020 04:30 4.29 09:00 8.65 6.46 04:50 0.96 21:30 2.03 1.64 04:50 0.243 09:05 1.319 0.759 0.759 03/04/2020 04:45 4.59 08:20 8.56 6.65 03:50 1.10 08:10 2.13 1.68 03:50 0.302 08:25 1.362 0.802 0.802 03/05/2020 04:30 4.80 08:45 8.55 6.71 04:25 1.14 08:45 2.07 1.66 04:25 0.328 08:45 1.333 0.791 0.791 03/06/2020 04:55 4.29 08:50 8.10 6.52 04:45 1.01 08:45 1.96 1.59 04:50 0.248 08:45 1.174 0.740 0.740 03/07/2020 05:10 4.64 12:15 8.39 6.91 05:10 1.10 12:50 1.95 1.64 05:10 0.304 12:50 1.214 0.829 0.829 03/08/2020 05:15 4.36 11:20 8.18 6.66 04:40 1.00 11:20 2.12 1.67 04:40 0.252 11:20 1.286 0.812 0.812 03/09/2020 04:00 4.54 20:30 7.88 6.40 04:05 1.00 20:40 1.98 1.61 04:05 0.266 20:30 1.140 0.728 0.727 Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Rain
(in)
Avg
Total

6.51 1.54

81.489

0.709

4.90 Report Summary For The Period 11/16/2019 00:00 - 03/09/2020 23:59 12 1309
Item # 16.

Site Commentary
Site Information
MIL_0186
Pipe Dimensions 8
Silt Level 1.63"
Overview
Site MIL_0186 functioned under normal conditions during the period Saturday, November 16, 2019 to Monday, March 9, 2020 . This site exhibited an observable response to the wet weather events of November 26, 2019 - November 27, 2019 and December 7, 2019 - December 8, 2019. Surcharge conditions were experienced at this location. Review of the scattergraph shows free flow conditions during the study period.

Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted to date and support the relative accuracy of the flow monitor at this location. Data confidence is less than typical due to sediment. A data gap also occurs beginning February 02, 2020 through February 14, 2020 and another data gap on March 02, 2020 through March 05, 2020 resulting from a meter malfunction.

Observations
Average flow depth, velocity, and quantity data observed during Saturday, November 16, 2019 to Monday, March 9, 2020 , along with observed minimum and maximum data, are provided in the following table.

Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 4.25 1.45 0.133
Minimum 2.64 0.71 0.030
Maximum 8.80 2.50 0.482
Time of Minimum 2/23/2020 3:35 AM 11/18/2019 3:25 AM 11/18/2019 3:25 AM Time of Maximum 3/6/2020 2:15 PM 12/4/2019 5:30 AM 12/4/2019 5:30 AM Data Quality
Data uptime observed during the Saturday, November 16, 2019 to the Monday, March 9, 2020 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period. 90 days of data provided.

Percent Uptime
Depth (in) 88
Velocity (ft/s) 88
Quantity (MGD) 88
13 1310
Item # 16.

Latitude: 37.454452°
Longitude: -121.910707°
Site Sketch Profile View or Photo
Sensor Shot
MIL_0186
TRITON+
System Characteristics
Location Type
Pipe Shape Drive
Milpitas Temp Study 2019-20
Drive Medium
Site Access Details:

Site Address /Location:

Site Name
N Milpitas Blvd and Sunnyhills Ct
Flow Monitoring
Site Report
Installation Information
Circular
Monitor Series
Monitor Location:

Doppler Standard Ring and Crank
Manhole #
Installation Date:

Pipe Size (H x W)
Topside / Area Photo
Tuesday, November 12, 2019
Access
Temporary

8.0" x 8.0"
Traffic
186 Residential
Map
Installation Type:

Monitoring Location (Sensors):

Peak Combo (CS4)
Pipe Size (HxW)

1.63 Downlooker Physical Offset (in) Measurement Confidence (in) NA
Peak Velocity (fps)
Silt (in)
3:47:18 AM 8.0" x 8.0"
Medium depth with moderate velocity
0 - 5 psi
Depth of Flow (Wet DOF) (in) Range (Air DOF) (in)

3.75 Velocity Sensor Offset (in)

0.91 Upstream 0-5 FT Manhole
Sensors / Devices:

Installation Confirmation:

Manhole Opening Diameter (in)
Silt Type
Hydraulic Comments:
0''
Single

0.25"
Manhole / Pipe Information:

Pressure Sensor Range (psi)
Confirmation Time:

0.00"
26'' 54''
Manhole Cover Manhole Frame
Pipe Condition:

Manhole Material:

Manhole Diameter (Approx.):

Manhole Depth (Approx. FT): Manhole Configuration
Concrete Good
7'
Manhole Condition:
22431.11.325
Additional Site Info. / Comments:

ADS Project Name:

ADS Project Number:

Milpitas.WWTFM.CA19-20
Wireless
Pipe Material
Antenna Location
Communication Information:

Manhole Pick / Vent Hole
No
PVC
Unbolted Normal
Good
Active Drop Connections Air Quality:

Communication Type
Normal
North Inlet
(Sensors location)
South Outlet
West Inlet
14 1311
Item # 16.
15 1312
Item # 16.
16 1313
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 11/16/2019 05:15 3.20 12:20 5.64 4.37 05:55 1.05 10:50 1.77 1.48 05:15 0.057 12:20 0.237 0.143 0.143 11/17/2019 03:40 3.11 11:25 5.54 4.33 04:25 0.98 10:45 1.76 1.44 04:25 0.048 11:30 0.230 0.139 0.139 11/18/2019 03:05 2.88 18:05 5.00 4.10 03:25 0.71 18:20 1.84 1.40 03:25 0.030 17:35 0.203 0.123 0.123 11/19/2019 04:00 3.00 19:00 4.98 3.98 04:00 0.83 17:40 1.69 1.32 04:00 0.037 19:00 0.187 0.108 0.108 11/20/2019 03:45 3.15 20:10 5.37 4.22 03:25 1.00 19:40 1.74 1.44 03:25 0.051 20:10 0.223 0.130 0.130 11/21/2019 03:05 3.12 18:15 5.37 4.27 03:55 0.95 19:15 1.70 1.41 03:55 0.047 19:15 0.216 0.130 0.130 11/22/2019 01:50 3.18 14:25 6.22 4.64 01:50 0.96 14:25 1.87 1.51 01:50 0.049 14:25 0.289 0.159 0.159 11/23/2019 04:40 3.36 17:35 5.69 4.62 04:40 1.02 14:05 1.87 1.48 04:40 0.058 14:05 0.246 0.156 0.156 11/24/2019 04:05 3.32 14:10 6.25 4.65 04:05 0.93 14:10 1.83 1.47 04:05 0.052 14:10 0.285 0.157 0.157 11/25/2019 03:40 3.31 18:30 5.37 4.41 04:00 1.00 18:30 1.71 1.42 03:40 0.055 18:30 0.219 0.138 0.138 11/26/2019 02:20 3.39 20:15 5.60 4.41 02:20 0.99 19:20 1.77 1.43 02:20 0.057 20:15 0.238 0.139 0.139 0.63 11/27/2019 03:15 3.37 20:10 5.55 4.51 03:25 0.97 20:10 1.73 1.45 03:25 0.057 20:10 0.232 0.147 0.147 0.77 11/28/2019 04:25 3.27 11:00 5.69 4.34 05:15 0.99 11:00 1.85 1.43 04:25 0.054 11:00 0.256 0.137 0.137 11/29/2019 03:55 3.29 17:40 5.39 4.24 03:50 0.91 17:40 1.97 1.48 03:50 0.050 17:40 0.253 0.136 0.136 0.05 11/30/2019 04:10 3.20 11:50 6.33 4.48 03:00 1.06 13:00 1.90 1.52 03:00 0.057 11:50 0.300 0.154 0.154 0.14 12/01/2019 05:10 3.23 13:35 5.79 4.46 02:25 0.87 13:35 1.68 1.32 05:05 0.046 13:35 0.239 0.133 0.133 0.06 12/02/2019 04:35 3.51 12:00 5.39 4.47 04:10 0.85 18:40 1.66 1.30 04:10 0.053 12:00 0.210 0.130 0.130 0.36 12/03/2019 03:55 3.30 11:25 5.34 4.34 03:55 0.87 11:15 1.65 1.25 03:55 0.048 11:25 0.195 0.119 0.119 12/04/2019 02:35 3.53 05:30 8.48 4.49 02:35 0.84 05:30 2.50 1.32 02:35 0.053 05:30 0.482 0.132 0.132 0.44 12/05/2019 02:15 3.42 18:15 6.88 4.50 02:15 0.91 18:45 1.83 1.34 02:15 0.053 18:15 0.295 0.136 0.136 12/06/2019 05:05 3.53 17:50 6.03 4.54 03:25 0.87 17:50 1.79 1.34 03:25 0.057 17:50 0.268 0.137 0.137 0.06 12/07/2019 04:25 3.57 06:55 8.34 4.79 02:55 0.87 18:40 1.91 1.42 02:55 0.057 17:25 0.330 0.160 0.160 0.84 12/08/2019 03:40 3.32 10:55 5.95 4.65 03:40 0.86 11:20 1.86 1.39 03:40 0.048 10:55 0.269 0.151 0.151 0.10 12/09/2019 02:55 3.49 12:55 5.47 4.43 02:55 0.94 12:55 1.65 1.31 02:55 0.057 12:55 0.217 0.128 0.128 12/10/2019 03:10 3.34 19:00 5.46 4.38 03:10 0.87 19:00 1.65 1.29 03:10 0.049 19:00 0.217 0.124 0.124 0.01 12/11/2019 03:40 3.25 20:05 5.32 4.32 03:40 0.83 20:05 1.61 1.26 03:40 0.044 20:05 0.204 0.120 0.120 0.00 12/12/2019 03:45 3.45 12:40 5.53 4.52 03:45 0.92 19:15 1.75 1.37 03:45 0.055 19:15 0.233 0.140 0.140 12/13/2019 04:10 3.49 18:25 7.77 4.54 04:10 0.94 18:25 1.96 1.38 04:10 0.058 18:25 0.374 0.142 0.142 12/14/2019 03:10 3.61 11:45 6.10 4.71 03:10 0.99 10:50 1.93 1.40 03:10 0.065 10:50 0.282 0.154 0.154 0.01 12/15/2019 05:15 3.26 18:30 6.35 4.70 05:15 0.83 19:50 1.82 1.40 05:15 0.045 18:30 0.280 0.158 0.158 12/16/2019 03:15 3.25 19:00 5.69 4.33 02:40 1.14 18:50 1.76 1.50 03:05 0.061 19:00 0.242 0.141 0.141 12/17/2019 03:35 3.17 11:35 5.00 4.15 04:55 1.21 19:10 1.76 1.55 04:55 0.063 11:30 0.201 0.135 0.135 12/18/2019 03:35 3.19 13:25 5.40 4.28 02:05 1.10 14:15 1.80 1.54 03:35 0.059 13:25 0.223 0.142 0.142 12/19/2019 04:20 3.32 20:25 5.64 4.29 04:20 1.26 20:25 1.80 1.55 04:20 0.070 20:25 0.247 0.143 0.143 12/20/2019 03:25 3.07 18:50 5.49 4.24 03:25 1.14 20:50 1.79 1.55 03:25 0.053 18:50 0.234 0.141 0.141 0.02 12/21/2019 03:40 3.16 10:30 6.15 4.39 05:15 1.14 13:25 1.77 1.51 05:15 0.061 11:10 0.267 0.146 0.146 12/22/2019 04:00 3.03 13:10 6.16 4.35 05:20 1.03 13:10 1.80 1.48 05:20 0.047 13:10 0.276 0.143 0.143 12/23/2019 03:55 3.10 15:05 5.78 4.20 03:55 1.16 11:40 1.79 1.50 03:55 0.055 15:05 0.244 0.135 0.135 12/24/2019 03:20 3.16 12:15 5.83 4.29 04:35 1.07 12:25 1.80 1.48 03:20 0.054 12:30 0.247 0.138 0.138 12/25/2019 05:30 3.14 11:35 5.87 4.13 03:25 1.12 11:35 1.81 1.49 05:35 0.057 11:35 0.261 0.129 0.129 12/26/2019 05:35 3.10 11:45 5.49 4.14 03:30 1.07 11:45 1.69 1.44 05:25 0.053 11:45 0.223 0.126 0.126 12/27/2019 04:30 2.92 13:50 5.86 4.20 04:30 1.07 13:20 1.75 1.49 04:30 0.044 13:50 0.250 0.135 0.135 12/28/2019 04:10 2.96 10:50 6.81 4.29 03:15 1.09 10:45 1.79 1.48 03:10 0.049 10:50 0.302 0.139 0.139 12/29/2019 04:05 2.99 12:00 5.94 4.37 05:10 0.99 18:35 1.78 1.47 05:05 0.046 12:00 0.250 0.144 0.144 12/30/2019 04:00 3.00 11:20 5.74 4.19 04:05 1.00 17:30 1.74 1.50 04:05 0.044 11:20 0.229 0.135 0.135 12/31/2019 04:20 2.98 12:55 5.49 4.20 02:00 1.08 11:10 1.74 1.50 04:20 0.048 12:55 0.230 0.135 0.135 Daily Tabular Report
Daily Tabular Report For The Period 11/16/2019 00:00 - 03/09/2020 23:59 MIL_0186, Pipe Height: 8.00 in, Silt: 1.63 in
17 1314
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 01/01/2020 05:30 3.00 12:40 5.79 4.11 05:20 0.99 12:55 1.73 1.45 05:20 0.045 12:40 0.243 0.126 0.126 01/02/2020 02:55 3.05 05:20 8.60 4.21 02:55 1.03 05:20 2.10 1.45 02:55 0.047 05:20 0.404 0.131 0.131 01/03/2020 03:40 3.15 11:25 5.54 4.28 04:05 1.13 11:25 1.69 1.48 03:40 0.061 11:25 0.226 0.136 0.136 01/04/2020 04:25 2.98 11:45 5.85 4.27 04:30 1.02 10:25 1.79 1.49 04:30 0.046 11:45 0.252 0.139 0.139 01/05/2020 04:30 2.96 13:05 6.15 4.33 03:30 0.97 13:05 1.78 1.46 04:30 0.042 13:05 0.272 0.142 0.142 01/06/2020 03:10 2.93 19:00 5.10 4.06 03:10 0.94 10:05 1.73 1.51 03:10 0.039 19:00 0.203 0.128 0.128 01/07/2020 02:00 2.91 18:45 5.29 3.99 03:25 1.06 19:15 1.76 1.51 02:00 0.047 18:45 0.214 0.123 0.123 01/08/2020 04:25 3.01 18:15 5.36 4.12 04:20 1.09 20:40 1.69 1.47 04:20 0.049 18:15 0.209 0.127 0.127 01/09/2020 03:20 2.91 19:10 5.53 4.21 03:35 1.03 18:55 1.75 1.47 03:35 0.042 19:15 0.226 0.133 0.133 01/10/2020 03:40 2.97 12:00 5.53 4.22 04:35 1.12 13:50 1.74 1.49 03:40 0.048 19:25 0.227 0.135 0.135 01/11/2020 03:30 2.94 10:45 6.03 4.34 03:35 1.01 10:50 1.79 1.49 03:35 0.043 10:45 0.267 0.144 0.144 01/12/2020 04:15 2.91 18:55 5.99 4.35 04:55 1.08 18:50 1.82 1.53 04:10 0.045 18:55 0.268 0.147 0.147 01/13/2020 02:50 2.91 18:30 5.22 3.96 02:50 1.09 20:00 1.74 1.54 02:50 0.045 18:30 0.213 0.124 0.124 01/14/2020 04:55 2.96 21:00 4.97 4.01 05:10 1.12 20:50 1.74 1.54 05:10 0.048 21:00 0.198 0.127 0.106 01/15/2020 05:10 2.84 21:15 5.56 4.02 06:00 1.09 21:05 1.79 1.52 05:35 0.044 21:20 0.227 0.126 0.126 0.10 01/16/2020 05:40 2.91 13:55 6.07 4.18 06:00 1.15 12:45 1.83 1.57 05:30 0.048 13:45 0.269 0.140 0.140 0.66 01/17/2020 04:10 2.98 21:15 5.31 4.18 04:10 1.13 12:30 1.80 1.55 04:10 0.049 19:25 0.224 0.138 0.138 01/18/2020 05:20 2.98 14:10 6.16 4.32 05:20 1.13 14:30 1.81 1.53 05:20 0.049 14:10 0.272 0.145 0.145 01/19/2020 06:55 3.01 13:40 5.86 4.31 08:00 1.08 13:05 1.79 1.49 06:55 0.050 13:40 0.253 0.141 0.141 01/20/2020 05:35 2.93 18:50 5.77 4.29 04:50 1.13 17:50 1.77 1.47 05:35 0.048 18:50 0.236 0.136 0.136 01/21/2020 06:15 3.05 13:10 5.09 4.12 07:00 1.08 20:30 1.66 1.43 06:15 0.052 20:30 0.189 0.124 0.124 0.01 01/22/2020 05:15 3.12 13:45 5.34 4.22 05:20 1.04 21:00 1.69 1.45 05:20 0.051 20:35 0.208 0.130 0.130 0.09 01/23/2020 02:55 3.04 19:40 5.66 4.29 02:40 1.04 19:20 1.70 1.44 03:30 0.048 20:25 0.231 0.134 0.123 01/24/2020 05:30 3.10 13:25 6.38 4.33 05:00 1.08 12:15 1.71 1.42 05:30 0.052 13:25 0.258 0.135 0.135 01/25/2020 05:40 3.02 12:20 5.91 4.20 05:30 1.03 11:00 1.84 1.47 05:40 0.047 12:20 0.257 0.133 0.133 01/26/2020 03:30 2.97 11:15 5.69 4.25 03:05 1.14 11:05 1.68 1.49 03:25 0.050 11:15 0.227 0.136 0.136 0.16 01/27/2020 04:50 2.78 11:25 5.34 4.09 05:10 1.07 08:05 1.67 1.44 03:50 0.041 20:15 0.206 0.124 0.113 01/28/2020 04:45 2.79 22:10 5.13 4.03 04:00 1.04 19:25 1.66 1.47 04:45 0.039 20:15 0.193 0.123 0.123 0.02 01/29/2020 03:55 2.83 20:40 5.37 4.11 03:35 1.05 21:40 1.66 1.46 03:35 0.042 20:40 0.211 0.125 0.125 01/30/2020 03:40 2.84 19:55 5.43 4.09 03:20 1.03 16:15 1.70 1.47 03:40 0.042 19:50 0.214 0.126 0.126 01/31/2020 05:10 2.77 19:25 5.28 4.05 04:05 0.95 20:05 1.77 1.50 04:05 0.036 21:50 0.213 0.127 0.127 0.01 02/01/2020 04:45 2.73 14:55 6.17 4.26 02:50 0.94 12:20 1.76 1.46 04:55 0.035 11:35 0.266 0.138 0.138 02/02/2020 04:45 2.75 10:30 6.14 4.00 04:20 1.15 12:20 1.75 1.49 04:45 0.041 10:30 0.261 0.125 0.076 02/03/2020 00:00 00:00 00:00 00:00 00:00 00:00
02/04/2020 00:00 00:00 00:00 00:00 00:00 00:00
02/05/2020 00:00 00:00 00:00 00:00 00:00 00:00
02/06/2020 00:00 00:00 00:00 00:00 00:00 00:00
02/07/2020 00:00 00:00 00:00 00:00 00:00 00:00
02/08/2020 00:00 00:00 00:00 00:00 00:00 00:00
02/09/2020 00:00 00:00 00:00 00:00 00:00 00:00
02/10/2020 00:00 00:00 00:00 00:00 00:00 00:00
02/11/2020 00:00 00:00 00:00 00:00 00:00 00:00
02/12/2020 00:00 00:00 00:00 00:00 00:00 00:00
02/13/2020 00:00 00:00 00:00 00:00 00:00 00:00
02/14/2020 05:00 2.84 19:35 5.05 4.19 05:00 1.10 20:30 1.78 1.60 05:00 0.043 19:35 0.199 0.140 0.112 02/15/2020 05:15 2.69 11:50 5.78 4.08 05:50 1.13 11:50 1.77 1.54 05:15 0.039 11:50 0.251 0.133 0.133 02/16/2020 04:55 2.81 11:05 5.62 4.11 03:10 0.97 16:55 1.78 1.47 05:05 0.037 11:05 0.232 0.129 0.129 02/17/2020 04:05 2.85 19:40 5.43 3.94 04:20 0.98 17:20 1.76 1.46 04:15 0.039 19:40 0.218 0.119 0.119 02/18/2020 04:15 2.90 13:20 4.65 3.87 02:40 1.03 14:10 1.75 1.48 04:15 0.043 13:40 0.167 0.115 0.115 02/19/2020 02:50 2.87 12:50 5.24 3.98 02:35 0.97 08:50 1.76 1.44 02:35 0.039 12:50 0.200 0.118 0.118 02/20/2020 03:15 2.71 11:45 5.28 3.99 03:15 0.95 18:45 1.66 1.44 03:15 0.033 11:45 0.201 0.119 0.119 02/21/2020 02:55 2.68 18:20 5.48 4.01 03:00 0.92 18:45 1.68 1.41 02:55 0.032 18:20 0.211 0.118 0.118 02/22/2020 04:25 2.70 13:40 5.70 4.10 04:20 0.96 13:40 1.67 1.42 04:25 0.033 13:40 0.232 0.124 0.124 02/23/2020 03:35 2.64 12:40 5.61 4.16 03:30 0.96 17:35 1.73 1.42 03:30 0.031 13:35 0.232 0.129 0.129 02/24/2020 03:50 2.70 11:45 6.05 3.94 03:45 0.99 21:25 1.69 1.43 03:50 0.034 11:45 0.232 0.115 0.115 18 1315
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 02/25/2020 03:40 2.82 21:00 5.11 3.95 04:50 1.01 21:00 1.62 1.40 03:40 0.039 21:00 0.192 0.113 0.113 02/26/2020 02:45 2.74 19:15 5.58 4.13 02:35 0.95 19:05 1.64 1.43 02:45 0.034 19:15 0.219 0.125 0.125 02/27/2020 02:45 2.70 11:45 5.42 4.14 03:10 0.91 16:35 1.62 1.44 03:10 0.032 11:40 0.206 0.127 0.127 02/28/2020 04:20 3.05 18:30 5.46 4.24 04:20 1.14 19:50 1.64 1.46 04:20 0.052 19:50 0.212 0.133 0.133 02/29/2020 04:15 2.72 10:40 5.87 4.28 04:35 0.90 18:10 1.70 1.41 04:35 0.032 10:40 0.235 0.134 0.134 03/01/2020 05:15 2.73 11:45 5.96 4.27 04:20 0.84 13:25 1.72 1.40 04:20 0.030 11:45 0.245 0.133 0.133 03/02/2020 03:30 2.82 07:45 4.60 3.48 02:50 0.95 07:30 1.52 1.24 03:25 0.037 07:45 0.148 0.079 0.034 0.01 03/03/2020
03/04/2020
03/05/2020 03:40 2.93 12:45 5.21 4.10 02:30 0.94 12:45 1.60 1.41 02:30 0.039 12:45 0.196 0.121 0.121 03/06/2020 04:20 2.85 14:15 8.80 4.14 04:05 0.92 14:15 2.23 1.40 04:05 0.036 14:15 0.429 0.123 0.123 03/07/2020 05:05 3.01 14:15 5.90 4.41 05:05 1.07 15:10 1.77 1.44 05:05 0.048 15:10 0.257 0.141 0.141 0.58 03/08/2020 04:30 2.96 12:35 5.73 4.30 04:30 1.04 14:05 1.63 1.42 04:30 0.045 12:35 0.227 0.133 0.133 0.02 03/09/2020 04:05 2.91 20:05 5.34 4.08 04:05 1.01 12:40 1.60 1.39 04:05 0.041 20:00 0.202 0.119 0.119 0.11 Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Rain
(in)
Avg
Total

4.25 1.45

13.410

0.133

5.26 Report Summary For The Period 11/16/2019 00:00 - 03/09/2020 23:59 19 1316
Item # 16.

Site Commentary
Site Information
MIL_0190
Pipe Dimensions 18
Silt Level 0.00"
Overview
Site MIL_0190 functioned under normal conditions during the period Saturday, November 16, 2019 to Monday, March 9, 2020 . This site exhibited an observable response to the wet weather events of November 26, 2019 - November 27, 2019, December 7, 2019 - December 8, 2019, and January 16, 2020 - January 17, 2020. Review of the scattergraph shows that free flow conditions were recorded during the study period.

Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted to date and support the relative accuracy of the flow monitor at this location.

This location was installed upstream of site MIL_1790. (See MIL_1790 Site Commentary for More Details) Observations
Average flow depth, velocity, and quantity data observed during Saturday, November 16, 2019 to Monday, March 9, 2020 , along with observed minimum and maximum data, are provided in the following table.

Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 2.47 0.96 0.093
Minimum 1.80 0.41 0.024
Maximum 3.29 1.47 0.198
Time of Minimum 11/22/2019 4:00 AM 11/22/2019 3:50 AM 11/22/2019 3:50 AM Time of Maximum 12/12/2019 1:55 PM 3/6/2020 9:10 AM 3/6/2020 9:10 AM Data Quality
Data uptime observed during the Saturday, November 16, 2019 to the Monday, March 9, 2020 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.

Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
20 1317
Item # 16.

Latitude: 37.432482°
Longitude: -121.909452°
Site Sketch Profile View or Photo
Sensor Shot
MIL_0190
TRITON+
System Characteristics
Location Type
Pipe Shape middle of N bound lanes
Milpitas Temp Study 2019-20
Drive Heavy
Site Access Details:

Site Address /Location:

Site Name
N Abel St and Weller Ln
Flow Monitoring
Site Report
Installation Information
Circular
Monitor Series
Monitor Location:

Doppler Standard Ring and Crank
Manhole #
Installation Date:

Pipe Size (H x W)
Topside / Area Photo
Wednesday, November 13, 2019
Access
Temporary

18.0" x 18.0"
Traffic
190 Residential
Map
Installation Type:

Monitoring Location (Sensors):

Peak Combo (CS4)
Pipe Size (HxW)
0''
Downlooker Physical Offset (in) Measurement Confidence (in) NA
Peak Velocity (fps)
Silt (in)
10:04:15 AM 18.0" x 18.0"
Smooth shallow flow with moderate velocity
0 - 5 psi
Depth of Flow (Wet DOF) (in) Range (Air DOF) (in)

3.00 Velocity Sensor Offset (in)

0.97 Upstream 0-5 FT Manhole
Sensors / Devices:

Installation Confirmation:

Manhole Opening Diameter (in)
Silt Type
Hydraulic Comments:
0''
Single

0.25"
Manhole / Pipe Information:

Pressure Sensor Range (psi)
Confirmation Time:

0.00"
26'' 54''
Manhole Cover Manhole Frame
Pipe Condition:

Manhole Material:

Manhole Diameter (Approx.):

Manhole Depth (Approx. FT): Manhole Configuration
Concrete Good
8'
Manhole Condition:
22431
Additional Site Info. / Comments:

ADS Project Name:

ADS Project Number:

Milpitas.WWTFM.CA19-20
Wireless
Pipe Material
Antenna Location
Communication Information:

Manhole Pick / Vent Hole
No
Vitrified Clay Pipe
Unbolted Normal
Good
Active Drop Connections Air Quality:

Communication Type
Normal
South Inlet
(Sensors location)
North Outlet
21 1318
Item # 16.
22 1319
Item # 16.
23 1320
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 11/16/2019 05:40 1.91 11:20 2.88 2.45 05:30 0.55 12:55 1.35 0.96 05:30 0.036 13:00 0.155 0.093 0.093 11/17/2019 05:05 1.95 11:00 3.02 2.48 04:10 0.58 10:55 1.36 0.98 04:10 0.040 10:55 0.172 0.097 0.097 11/18/2019 03:55 1.91 11:05 2.74 2.42 03:45 0.53 20:00 1.23 0.94 03:45 0.034 11:10 0.130 0.089 0.089 11/19/2019 05:35 1.89 09:05 2.81 2.44 05:35 0.54 18:45 1.38 0.95 05:35 0.034 18:45 0.150 0.091 0.091 11/20/2019 04:35 1.91 19:10 2.80 2.46 04:25 0.49 08:35 1.25 0.94 04:25 0.032 19:05 0.137 0.091 0.091 11/21/2019 04:40 1.95 21:10 2.88 2.41 04:40 0.55 18:35 1.19 0.92 04:40 0.037 21:15 0.138 0.086 0.086 11/22/2019 04:00 1.80 10:45 2.76 2.41 03:50 0.41 10:25 1.23 0.93 03:50 0.024 10:35 0.134 0.088 0.088 11/23/2019 03:20 1.96 10:15 2.91 2.46 05:00 0.54 11:15 1.30 0.94 05:00 0.037 10:15 0.150 0.092 0.092 11/24/2019 03:40 1.98 12:35 2.81 2.44 03:35 0.57 21:55 1.25 0.96 03:35 0.039 22:00 0.141 0.092 0.092 11/25/2019 05:35 1.83 21:30 2.69 2.38 04:20 0.53 20:30 1.20 0.93 05:35 0.032 18:50 0.126 0.087 0.087 11/26/2019 05:40 1.84 21:15 2.87 2.39 03:50 0.44 12:50 1.28 0.93 03:50 0.027 21:15 0.147 0.088 0.088 0.36 11/27/2019 05:25 2.00 12:45 2.95 2.52 05:10 0.61 12:40 1.29 0.98 05:10 0.043 12:40 0.157 0.099 0.099 0.63 11/28/2019 05:25 1.92 12:45 3.00 2.41 06:25 0.52 12:50 1.30 0.93 06:25 0.034 12:50 0.160 0.088 0.088 11/29/2019 05:40 1.85 10:35 2.74 2.35 04:40 0.50 12:25 1.24 0.90 05:50 0.031 10:35 0.135 0.082 0.082 0.02 11/30/2019 05:35 1.99 11:05 2.78 2.42 05:15 0.58 14:20 1.22 0.94 05:15 0.040 11:05 0.135 0.089 0.089 0.10 12/01/2019 06:25 1.92 11:30 2.84 2.43 06:25 0.55 11:30 1.29 0.94 06:25 0.036 11:30 0.150 0.091 0.091 0.06 12/02/2019 05:15 1.92 09:00 2.95 2.56 04:10 0.55 09:00 1.20 1.00 04:10 0.037 09:00 0.147 0.104 0.104 0.30 12/03/2019 06:05 2.19 13:25 3.24 2.75 03:50 0.50 18:45 1.12 0.74 03:50 0.041 20:10 0.130 0.082 0.082 0.01 12/04/2019 02:15 2.36 11:10 2.98 2.72 05:15 0.52 09:10 1.26 0.91 04:00 0.048 09:10 0.153 0.101 0.101 0.39 12/05/2019 04:45 2.33 15:10 3.18 2.67 04:55 0.57 21:45 1.25 0.87 04:55 0.050 15:15 0.152 0.094 0.094 0.01 12/06/2019 03:50 2.01 19:25 2.89 2.49 05:20 0.58 19:25 1.28 0.95 03:20 0.041 19:25 0.152 0.094 0.094 0.01 12/07/2019 05:25 2.01 21:05 2.98 2.58 05:15 0.59 12:50 1.44 1.03 05:15 0.042 12:50 0.174 0.108 0.108 0.67 12/08/2019 04:25 2.18 10:50 2.99 2.63 05:15 0.72 10:55 1.37 1.07 05:15 0.056 10:55 0.170 0.113 0.113 0.20 12/09/2019 03:50 2.16 21:25 2.84 2.55 04:05 0.65 22:00 1.28 1.00 04:05 0.050 11:30 0.144 0.101 0.101 12/10/2019 04:35 2.05 19:00 2.77 2.50 03:40 0.61 11:00 1.23 0.96 03:40 0.044 11:00 0.134 0.094 0.094 12/11/2019 03:45 2.07 09:10 2.79 2.50 05:00 0.64 20:55 1.25 0.97 05:00 0.047 20:00 0.137 0.095 0.095 0.03 12/12/2019 03:45 2.08 13:55 3.29 2.50 03:55 0.63 13:50 1.38 0.97 03:55 0.047 13:55 0.196 0.095 0.095 0.01 12/13/2019 05:00 2.02 14:00 2.87 2.49 05:10 0.62 13:50 1.25 0.97 05:10 0.044 10:40 0.144 0.095 0.095 0.01 12/14/2019 05:35 2.05 11:05 2.90 2.53 04:55 0.66 12:05 1.30 1.01 05:35 0.048 11:00 0.150 0.102 0.102 0.01 12/15/2019 04:20 2.04 20:50 2.85 2.53 05:20 0.64 13:45 1.29 1.00 05:20 0.046 13:45 0.149 0.101 0.101 0.01 12/16/2019 04:10 2.01 21:15 2.89 2.48 03:50 0.59 11:25 1.27 0.98 03:50 0.042 21:15 0.145 0.096 0.096 0.01 12/17/2019 04:45 2.05 10:10 2.80 2.49 05:20 0.62 20:55 1.33 1.00 05:20 0.045 20:55 0.142 0.098 0.098 0.01 12/18/2019 04:45 1.99 14:30 2.81 2.48 05:30 0.58 22:00 1.36 0.98 05:30 0.040 22:00 0.148 0.096 0.096 0.01 12/19/2019 03:50 1.98 13:05 2.77 2.47 04:50 0.57 09:30 1.24 0.97 04:50 0.040 09:10 0.138 0.094 0.094 12/20/2019 04:20 1.98 20:55 2.92 2.49 04:00 0.54 20:55 1.29 0.95 04:00 0.038 20:55 0.155 0.093 0.093 12/21/2019 05:40 1.97 11:05 2.92 2.46 05:30 0.49 11:05 1.35 0.94 05:30 0.034 11:05 0.162 0.092 0.092 0.01 12/22/2019 06:25 1.94 11:10 2.91 2.50 05:15 0.52 11:00 1.38 0.99 05:15 0.035 11:00 0.163 0.099 0.099 0.41 12/23/2019 05:10 2.04 13:40 2.91 2.52 03:40 0.63 10:45 1.32 0.97 03:40 0.045 13:40 0.154 0.097 0.097 12/24/2019 05:25 2.07 18:25 2.95 2.54 04:55 0.64 20:25 1.25 0.98 04:55 0.047 18:30 0.150 0.099 0.099 0.02 12/25/2019 06:00 2.02 12:30 2.94 2.47 05:30 0.65 14:30 1.47 0.96 05:55 0.047 14:30 0.174 0.093 0.093 0.08 12/26/2019 04:55 2.00 10:40 2.70 2.42 05:10 0.63 19:45 1.20 0.94 04:55 0.044 19:45 0.128 0.088 0.088 12/27/2019 04:50 1.94 13:05 2.82 2.44 04:45 0.53 19:35 1.17 0.91 04:45 0.035 13:05 0.134 0.087 0.087 12/28/2019 06:30 1.95 14:20 2.93 2.48 06:20 0.49 14:30 1.22 0.91 06:20 0.033 14:30 0.145 0.090 0.090 12/29/2019 06:05 1.94 10:30 2.84 2.45 05:40 0.50 21:30 1.19 0.89 05:50 0.033 20:05 0.133 0.087 0.087 0.22 12/30/2019 04:45 1.99 12:55 2.91 2.50 05:45 0.56 12:55 1.21 0.92 05:45 0.039 12:55 0.145 0.092 0.092 12/31/2019 05:15 2.01 19:25 3.00 2.56 04:20 0.54 19:00 1.26 0.95 05:05 0.039 19:25 0.157 0.098 0.098 0.01 Daily Tabular Report
Daily Tabular Report For The Period 11/16/2019 00:00 - 03/09/2020 23:59 MIL_0190, Pipe Height: 18.00 in, Silt: 0.00 in
24 1321
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 01/01/2020 06:05 2.01 17:10 3.07 2.51 06:15 0.56 17:10 1.31 0.93 06:15 0.039 17:10 0.170 0.093 0.093 01/02/2020 05:30 2.04 21:25 2.85 2.50 04:45 0.59 15:10 1.19 0.92 04:45 0.042 21:20 0.134 0.091 0.091 01/03/2020 05:20 1.96 13:10 2.87 2.48 04:25 0.50 12:40 1.19 0.90 04:25 0.035 13:05 0.138 0.089 0.089 01/04/2020 05:50 2.01 13:20 2.91 2.50 05:15 0.54 12:40 1.21 0.92 05:15 0.038 12:40 0.144 0.092 0.092 01/05/2020 05:55 1.93 21:00 3.01 2.47 05:40 0.50 21:00 1.34 0.93 05:40 0.033 21:00 0.168 0.093 0.093 01/06/2020 05:00 1.86 20:55 2.72 2.40 04:45 0.46 11:20 1.22 0.93 04:45 0.029 12:05 0.128 0.087 0.087 01/07/2020 04:55 1.85 21:00 2.80 2.38 04:55 0.50 20:55 1.30 0.92 04:55 0.031 20:55 0.148 0.086 0.086 01/08/2020 05:30 1.84 21:25 2.77 2.39 05:20 0.50 21:15 1.20 0.92 05:30 0.031 21:15 0.131 0.086 0.086 0.02 01/09/2020 05:00 1.88 08:55 2.71 2.41 04:45 0.51 21:15 1.19 0.92 04:55 0.033 21:15 0.127 0.087 0.087 0.18 01/10/2020 05:10 1.82 20:40 2.78 2.38 04:55 0.50 09:35 1.26 0.93 05:10 0.030 09:35 0.135 0.086 0.086 0.02 01/11/2020 05:25 1.87 11:10 2.93 2.43 05:05 0.52 12:40 1.32 0.94 05:05 0.033 12:40 0.154 0.091 0.091 0.01 01/12/2020 05:10 1.88 11:15 2.92 2.46 05:35 0.54 19:05 1.29 0.96 05:35 0.034 11:15 0.147 0.094 0.094 01/13/2020 03:45 1.94 20:45 2.81 2.43 04:25 0.58 20:45 1.18 0.95 04:25 0.040 20:45 0.134 0.091 0.091 0.02 01/14/2020 03:35 1.90 19:45 2.82 2.44 02:25 0.57 19:40 1.31 0.96 03:25 0.038 19:40 0.149 0.092 0.092 0.11 01/15/2020 04:55 1.91 21:10 2.77 2.44 04:45 0.56 19:35 1.23 0.95 04:45 0.037 21:10 0.137 0.091 0.091 0.07 01/16/2020 04:30 1.93 12:40 3.22 2.52 03:20 0.54 12:50 1.38 1.00 03:50 0.036 12:40 0.186 0.102 0.102 0.66 01/17/2020 04:40 2.08 19:05 2.90 2.54 04:45 0.71 10:55 1.29 1.03 04:45 0.052 19:00 0.149 0.103 0.103 01/18/2020 05:40 1.98 14:40 3.02 2.51 03:40 0.55 14:40 1.35 0.99 03:40 0.040 14:40 0.170 0.099 0.099 01/19/2020 04:35 1.95 10:40 2.84 2.43 04:10 0.58 14:00 1.32 0.95 04:10 0.039 14:00 0.146 0.090 0.090 01/20/2020 05:20 1.95 20:05 2.85 2.44 06:10 0.55 11:00 1.35 0.97 06:10 0.038 11:00 0.149 0.093 0.093 01/21/2020 04:55 1.94 21:00 2.85 2.45 05:10 0.57 21:05 1.27 0.97 05:10 0.038 21:05 0.147 0.094 0.094 01/22/2020 05:25 1.92 09:10 2.74 2.41 05:30 0.55 08:55 1.25 0.96 05:25 0.036 09:00 0.135 0.090 0.090 0.03 01/23/2020 05:20 2.01 09:20 2.76 2.42 02:45 0.59 09:00 1.29 0.96 02:45 0.042 11:55 0.138 0.090 0.090 01/24/2020 05:05 1.92 19:45 3.01 2.49 05:10 0.54 19:45 1.32 1.00 05:10 0.035 19:45 0.165 0.099 0.099 01/25/2020 06:20 2.00 10:45 2.93 2.49 06:05 0.55 10:25 1.32 1.00 06:05 0.039 10:25 0.157 0.099 0.099 01/26/2020 04:15 1.97 11:55 2.87 2.49 03:45 0.58 11:55 1.30 1.00 03:45 0.040 11:55 0.152 0.099 0.099 0.16 01/27/2020 04:40 1.97 19:45 2.78 2.48 04:20 0.55 08:35 1.30 1.00 04:20 0.037 21:05 0.139 0.098 0.098 01/28/2020 04:50 1.91 20:30 2.83 2.44 04:40 0.51 20:25 1.27 0.97 04:50 0.033 20:25 0.145 0.092 0.092 0.01 01/29/2020 05:25 1.83 09:15 2.79 2.39 05:10 0.48 19:20 1.28 0.94 05:10 0.029 09:10 0.136 0.088 0.088 01/30/2020 05:15 1.90 19:40 2.79 2.40 04:50 0.54 19:35 1.27 0.96 04:50 0.035 19:40 0.143 0.090 0.090 01/31/2020 04:00 1.95 09:05 2.74 2.46 04:40 0.57 13:50 1.25 1.00 04:40 0.039 13:50 0.135 0.096 0.096 02/01/2020 04:10 1.90 14:10 2.91 2.45 03:50 0.54 20:10 1.37 0.99 03:50 0.035 14:10 0.157 0.097 0.097 02/02/2020 05:35 1.83 12:15 2.88 2.45 05:30 0.50 12:35 1.46 0.99 05:30 0.031 12:35 0.171 0.097 0.097 02/03/2020 03:55 1.95 21:05 2.87 2.45 04:05 0.56 21:00 1.33 0.99 04:05 0.037 21:00 0.157 0.096 0.096 02/04/2020 04:00 2.02 20:05 2.74 2.45 03:10 0.63 22:10 1.28 1.00 04:00 0.046 20:20 0.139 0.096 0.096 02/05/2020 05:30 1.98 10:20 2.82 2.45 06:00 0.60 20:55 1.37 0.99 06:00 0.041 20:55 0.145 0.094 0.094 02/06/2020 04:20 1.84 10:55 2.70 2.41 03:20 0.51 21:25 1.23 0.96 03:00 0.033 21:25 0.130 0.091 0.091 02/07/2020 05:15 1.88 20:35 2.75 2.42 05:05 0.50 20:35 1.28 0.97 05:05 0.033 20:35 0.141 0.092 0.092 02/08/2020 05:20 1.98 09:45 3.01 2.47 04:05 0.61 09:40 1.41 1.02 05:05 0.042 09:40 0.173 0.099 0.099 02/09/2020 06:10 1.83 13:15 2.90 2.40 06:10 0.52 10:50 1.30 0.96 06:10 0.032 10:50 0.149 0.091 0.091 02/10/2020 05:20 1.91 21:15 2.76 2.41 03:50 0.60 07:55 1.34 0.98 03:50 0.039 07:55 0.136 0.092 0.092 02/11/2020 04:35 1.91 21:25 2.82 2.42 04:25 0.53 21:20 1.27 0.97 04:25 0.035 21:20 0.144 0.092 0.092 02/12/2020 04:05 1.87 21:25 2.76 2.42 03:45 0.51 20:00 1.21 0.98 03:45 0.033 21:25 0.133 0.093 0.093 02/13/2020 04:50 1.88 08:50 2.75 2.40 04:20 0.55 22:45 1.22 0.97 05:00 0.035 09:00 0.129 0.090 0.090 02/14/2020 05:05 1.88 11:05 2.77 2.44 03:20 0.53 20:40 1.32 0.99 03:20 0.034 20:40 0.141 0.095 0.095 02/15/2020 03:25 1.99 09:30 2.99 2.48 04:20 0.60 09:20 1.44 1.01 04:20 0.042 09:20 0.176 0.100 0.100 02/16/2020 05:15 1.90 13:40 2.88 2.45 05:25 0.57 14:10 1.28 0.99 05:25 0.037 13:45 0.151 0.097 0.097 02/17/2020 05:05 1.94 10:50 2.86 2.43 04:50 0.55 12:35 1.29 0.98 04:50 0.037 10:45 0.148 0.094 0.094 02/18/2020 03:35 1.87 18:10 2.84 2.45 03:45 0.54 18:10 1.20 0.95 03:30 0.034 18:10 0.139 0.092 0.092 02/19/2020 04:10 1.95 12:05 2.82 2.47 04:15 0.53 20:45 1.21 0.94 04:10 0.035 20:45 0.137 0.092 0.092 02/20/2020 04:55 1.91 12:45 2.77 2.45 05:05 0.51 18:45 1.22 0.93 05:05 0.033 20:30 0.131 0.090 0.090 02/21/2020 05:15 1.97 09:30 2.86 2.48 04:35 0.53 18:45 1.27 0.95 04:35 0.036 09:30 0.140 0.093 0.093 02/22/2020 06:10 1.97 11:10 3.00 2.48 05:55 0.56 11:50 1.27 0.96 05:55 0.038 11:10 0.158 0.095 0.095 02/23/2020 05:15 1.87 11:25 2.87 2.45 06:00 0.54 10:10 1.35 0.98 06:00 0.034 10:10 0.152 0.096 0.096 02/24/2020 03:55 1.89 19:50 2.81 2.43 04:05 0.48 19:40 1.25 0.97 04:05 0.031 19:40 0.142 0.093 0.093 25 1322
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 02/25/2020 04:55 1.88 21:15 2.81 2.42 04:40 0.52 19:55 1.26 0.95 04:40 0.034 21:10 0.139 0.090 0.090 02/26/2020 05:05 1.92 21:15 2.74 2.42 04:50 0.55 20:30 1.27 0.96 04:55 0.036 20:30 0.135 0.091 0.091 02/27/2020 04:55 1.94 20:55 2.78 2.44 05:00 0.57 08:50 1.26 0.96 05:00 0.038 20:30 0.138 0.091 0.091 02/28/2020 05:10 1.91 20:35 2.75 2.44 05:05 0.51 20:45 1.21 0.95 05:05 0.033 21:20 0.132 0.091 0.091 02/29/2020 06:15 1.89 09:35 2.93 2.43 06:10 0.52 09:30 1.29 0.95 06:15 0.033 09:35 0.156 0.091 0.091 03/01/2020 05:00 1.90 21:10 2.84 2.44 06:10 0.55 12:30 1.33 0.96 06:10 0.036 12:30 0.148 0.093 0.093 03/02/2020 04:30 1.93 09:15 2.85 2.46 04:20 0.54 09:10 1.30 0.95 04:20 0.036 09:10 0.149 0.092 0.092 03/03/2020 05:40 1.90 21:40 2.79 2.44 05:20 0.52 19:10 1.22 0.93 05:20 0.034 19:10 0.136 0.089 0.089 03/04/2020 04:55 1.86 21:10 2.77 2.41 05:05 0.48 21:05 1.21 0.92 05:05 0.030 21:05 0.135 0.088 0.088 03/05/2020 04:10 1.91 20:55 2.78 2.44 03:30 0.55 18:55 1.16 0.94 03:35 0.036 21:10 0.129 0.091 0.091 03/06/2020 04:50 1.89 09:25 3.19 2.42 04:45 0.51 09:10 1.47 0.93 04:45 0.033 09:10 0.198 0.088 0.088 03/07/2020 05:30 1.88 13:55 3.03 2.52 05:10 0.54 16:10 1.31 1.00 05:25 0.034 13:55 0.166 0.102 0.102 03/08/2020 05:30 1.98 17:50 3.10 2.56 05:30 0.66 13:35 1.33 1.03 05:30 0.045 17:50 0.173 0.105 0.105 03/09/2020 03:50 2.01 11:50 2.91 2.49 03:45 0.63 11:40 1.24 0.99 03:45 0.044 11:50 0.145 0.098 0.098 Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Rain
(in)
Avg
Total

2.47 0.96

10.748

0.093

4.90 Report Summary For The Period 11/16/2019 00:00 - 03/09/2020 23:59 26 1323
Item # 16.

Site Commentary
Site Information
MIL_0229
Pipe Dimensions 21
Silt Level 0.00"
Overview
Site MIL_0229 functioned under normal conditions during the period Saturday, November 16, 2019 to Monday, March 9, 2020 . This site exhibited an observable response to the wet weather events of November 26, 2019 - November 27, 2019, December 7, 2019 - December 8, 2019, and January 16, 2020 - January 17, 2020. Review of the scattergraph shows free flow conditions were recorded during the study period.

Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted to date and support the relative accuracy of the flow monitor at this location.

This location was installed upstream of site MIL_2808. (See MIL_2808 Site Commentary for More Details) Observations
Average flow depth, velocity, and quantity data observed during Saturday, November 16, 2019 to Monday, March 9, 2020 , along with observed minimum and maximum data, are provided in the following table.

Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 3.46 0.59 0.103
Minimum 1.78 0.19 0.021
Maximum 5.18 0.94 0.253
Time of Minimum 11/29/2019 7:00 AM 2/26/2020 4:00 AM 11/29/2019 7:05 AM Time of Maximum 12/6/2019 3:20 PM 11/21/2019 9:05 AM 1/21/2020 1:55 PM Data Quality
Data uptime observed during the Saturday, November 16, 2019 to the Monday, March 9, 2020 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.

Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
27 1324
Item # 16.

Latitude: 37.420574°
Longitude: -121.921605°
Site Sketch Profile View or Photo
Sensor Shot
22431
Additional Site Info. / Comments:

ADS Project Name:

ADS Project Number:

Milpitas.WWTFM.CA19-20
Wireless
Pipe Material
Antenna Location
Communication Information:

Manhole Pick / Vent Hole
No
Concrete
Unbolted Normal
Good
Active Drop Connections Air Quality:

Communication Type
Normal
26'' 54''
Manhole Cover Manhole Frame
Pipe Condition:

Manhole Material:

Manhole Diameter (Approx.):

Manhole Depth (Approx. FT): Manhole Configuration
Concrete Good
15'
Manhole Condition:

Upstream 0-5 FT Manhole
Sensors / Devices:

Installation Confirmation:

Manhole Opening Diameter (in)
Silt Type
Hydraulic Comments:
0''
Single

0.25"
Manhole / Pipe Information:

Pressure Sensor Range (psi)
Confirmation Time:

Soft / Loose

0.00"
Peak Combo (CS4)
Pipe Size (HxW)

0.25''
Downlooker Physical Offset (in) Measurement Confidence (in) NA
Peak Velocity (fps)
Silt (in)
4:21:29 AM 21.0" x 21.0"
Shallow depth with slow velocity
0 - 5 psi
Depth of Flow (Wet DOF) (in) Range (Air DOF) (in)

2.25 Velocity Sensor Offset (in)

0.25 Installation Information
Circular
Monitor Series
Monitor Location:

Doppler Standard Ring and Crank
Manhole #
Installation Date:

Pipe Size (H x W)
Topside / Area Photo
Tuesday, November 12, 2019
Access
Temporary

21.0" x 21.0"
Traffic
229 Residential/Commercial
Map
Installation Type:

Monitoring Location (Sensors):

MIL_0229
TRITON+
System Characteristics
Location Type
Pipe Shape In right lane of road
Milpitas Temp Study 2019-20
Drive Medium
Site Access Details:

Site Address /Location:

Site Name
Bellew Dr and McCarthy Blvd
Flow Monitoring
Site Report
NW Outlet
Southeast Inlet
(Sensor Location)
28 1325
Item # 16.
29 1326
Item # 16.
30 1327
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 11/16/2019 21:15 2.61 10:30 4.06 3.16 23:25 0.39 10:30 0.75 0.52 20:50 0.044 10:30 0.157 0.079 0.079 11/17/2019 07:10 2.27 10:00 3.04 2.63 05:30 0.28 09:55 0.62 0.43 05:30 0.026 09:55 0.085 0.050 0.050 11/18/2019 03:25 2.07 10:15 3.89 2.91 02:45 0.29 10:10 0.78 0.52 03:15 0.023 10:15 0.153 0.072 0.072 11/19/2019 05:55 2.56 15:45 4.10 3.30 05:45 0.35 15:55 0.74 0.57 05:55 0.038 15:55 0.155 0.091 0.091 11/20/2019 03:35 2.72 09:40 4.27 3.35 03:40 0.37 09:40 0.82 0.59 03:40 0.044 09:40 0.185 0.099 0.099 11/21/2019 03:55 2.34 09:10 4.19 3.17 03:30 0.39 09:05 0.94 0.58 03:30 0.037 09:05 0.208 0.091 0.091 11/22/2019 04:40 2.46 09:15 4.42 3.20 04:00 0.40 09:20 0.94 0.60 04:00 0.041 09:15 0.225 0.093 0.093 11/23/2019 07:30 2.40 21:55 3.38 2.90 15:45 0.42 08:25 0.61 0.50 07:35 0.043 22:00 0.095 0.066 0.066 11/24/2019 07:05 2.49 21:15 3.92 3.07 06:50 0.34 20:55 0.68 0.50 07:05 0.036 21:15 0.134 0.073 0.073 11/25/2019 20:45 2.82 08:30 3.95 3.32 23:50 0.48 08:40 0.83 0.62 23:55 0.063 08:25 0.168 0.098 0.098 11/26/2019 06:05 2.61 21:05 4.22 3.37 04:05 0.38 21:05 0.79 0.59 04:05 0.044 21:05 0.176 0.099 0.099 0.36 11/27/2019 05:55 2.73 10:00 4.09 3.37 02:35 0.46 12:50 0.78 0.60 06:00 0.057 10:00 0.154 0.099 0.099 0.63 11/28/2019 05:35 2.21 12:00 3.37 2.75 05:40 0.34 12:00 0.63 0.49 05:40 0.030 12:00 0.101 0.060 0.060 11/29/2019 07:00 1.78 14:15 3.10 2.51 06:00 0.31 17:20 0.64 0.46 07:05 0.021 14:15 0.084 0.050 0.050 0.02 11/30/2019 06:05 2.34 22:05 3.32 2.79 04:10 0.41 12:45 0.63 0.51 04:10 0.040 12:45 0.096 0.063 0.063 0.10 12/01/2019 05:55 2.39 20:25 3.57 2.95 07:50 0.37 21:50 0.63 0.51 07:50 0.037 20:25 0.110 0.070 0.070 0.06 12/02/2019 04:25 2.82 18:10 4.36 3.59 23:55 0.47 10:05 0.76 0.61 04:25 0.060 18:10 0.169 0.110 0.110 0.30 12/03/2019 04:05 2.73 14:55 4.79 3.72 04:05 0.43 14:00 0.80 0.62 04:05 0.051 14:00 0.212 0.120 0.120 0.01 12/04/2019 23:55 2.51 16:25 4.47 3.40 03:00 0.39 16:40 0.74 0.56 05:00 0.048 16:40 0.174 0.095 0.095 0.39 12/05/2019 05:30 1.98 13:15 4.45 3.16 03:55 0.39 13:15 0.76 0.57 03:55 0.030 13:15 0.182 0.088 0.088 0.01 12/06/2019 03:25 2.50 15:20 5.18 3.79 04:55 0.41 15:20 0.82 0.59 04:15 0.043 15:20 0.243 0.121 0.121 0.01 12/07/2019 06:10 3.39 18:20 4.95 3.99 06:10 0.56 18:20 0.71 0.63 06:10 0.092 18:20 0.199 0.130 0.130 0.67 12/08/2019 05:50 3.37 21:05 4.61 3.89 05:50 0.56 21:05 0.69 0.62 05:50 0.091 21:05 0.173 0.124 0.124 0.20 12/09/2019 03:15 3.25 09:30 5.02 4.05 03:15 0.54 09:30 0.72 0.63 03:15 0.083 09:30 0.205 0.134 0.134 12/10/2019 03:25 2.87 13:45 5.11 3.81 02:15 0.47 13:45 0.75 0.60 02:45 0.063 13:45 0.221 0.119 0.119 12/11/2019 04:20 3.21 14:25 4.50 3.86 04:20 0.54 17:30 0.71 0.62 04:20 0.081 14:25 0.166 0.123 0.123 0.03 12/12/2019 04:15 3.32 13:55 4.71 3.81 01:45 0.54 14:00 0.74 0.62 23:30 0.088 14:00 0.191 0.122 0.122 0.01 12/13/2019 03:50 2.97 14:50 4.64 3.73 04:25 0.48 15:10 0.72 0.61 04:25 0.065 14:50 0.177 0.116 0.116 0.01 12/14/2019 06:50 3.07 14:40 4.17 3.59 05:55 0.50 12:25 0.67 0.57 06:20 0.070 12:25 0.138 0.102 0.102 0.01 12/15/2019 06:05 3.37 11:10 4.31 3.78 07:05 0.52 11:10 0.66 0.60 07:05 0.085 11:10 0.153 0.115 0.115 0.01 12/16/2019 03:35 3.55 10:00 4.86 4.00 03:35 0.52 10:05 0.86 0.70 03:35 0.090 10:05 0.216 0.146 0.146 0.01 12/17/2019 04:05 2.95 13:35 5.04 4.10 05:40 0.51 09:35 0.83 0.64 04:05 0.069 13:40 0.217 0.140 0.140 0.01 12/18/2019 03:35 3.66 11:45 5.16 4.41 03:35 0.53 14:10 0.69 0.61 03:35 0.096 10:15 0.199 0.148 0.148 0.01 12/19/2019 22:35 3.46 11:05 4.99 4.03 03:45 0.52 12:15 0.87 0.66 04:20 0.092 12:15 0.235 0.141 0.141 12/20/2019 05:40 3.22 15:45 4.28 3.76 04:25 0.55 14:55 0.79 0.66 04:25 0.085 14:55 0.177 0.126 0.126 12/21/2019 07:00 3.12 11:35 3.79 3.44 04:35 0.58 11:30 0.71 0.62 04:35 0.086 11:30 0.135 0.104 0.104 0.01 12/22/2019 06:25 3.24 14:30 3.92 3.60 02:15 0.55 14:30 0.72 0.62 02:15 0.088 14:30 0.143 0.110 0.110 0.41 12/23/2019 03:30 3.46 11:30 4.27 3.78 06:05 0.52 04:20 0.71 0.59 06:20 0.090 14:05 0.148 0.113 0.113 12/24/2019 06:35 3.14 12:15 4.13 3.58 04:45 0.49 12:30 0.65 0.56 07:15 0.072 12:30 0.139 0.099 0.099 0.02 12/25/2019 05:00 3.34 18:30 4.66 4.10 03:10 0.50 18:25 0.84 0.66 04:45 0.080 18:25 0.215 0.145 0.145 0.08 12/26/2019 19:55 3.21 01:00 4.41 3.84 23:00 0.51 12:05 0.76 0.65 18:55 0.085 12:25 0.178 0.128 0.128 12/27/2019 05:45 2.99 11:20 4.07 3.50 04:00 0.47 12:10 0.64 0.57 04:00 0.066 11:25 0.132 0.098 0.098 12/28/2019 05:00 2.98 12:50 4.09 3.21 06:45 0.48 13:00 0.74 0.57 06:45 0.066 12:50 0.151 0.086 0.086 12/29/2019 02:10 2.86 12:15 3.60 3.21 07:20 0.50 17:45 0.76 0.59 07:20 0.066 12:15 0.123 0.090 0.090 0.22 12/30/2019 02:20 3.07 11:20 4.08 3.53 02:55 0.52 18:35 0.76 0.65 02:55 0.074 14:50 0.155 0.113 0.113 12/31/2019 06:45 2.53 11:50 3.64 3.15 04:55 0.54 00:55 0.71 0.64 06:40 0.058 11:50 0.122 0.094 0.094 0.01 Daily Tabular Report
Daily Tabular Report For The Period 11/16/2019 00:00 - 03/09/2020 23:59 MIL_0229, Pipe Height: 21.00 in, Silt: 0.00 in
31 1328
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 01/01/2020 05:40 2.87 12:50 3.74 3.21 03:45 0.49 16:50 0.70 0.59 05:40 0.064 12:50 0.126 0.089 0.089 01/02/2020 03:20 2.99 13:10 4.21 3.60 04:30 0.51 09:45 0.72 0.62 04:30 0.070 13:10 0.157 0.111 0.111 01/03/2020 07:15 3.10 10:40 4.07 3.56 02:45 0.52 12:35 0.68 0.61 02:45 0.075 10:15 0.143 0.107 0.107 01/04/2020 07:10 2.81 11:55 3.54 3.16 06:05 0.52 22:35 0.64 0.58 07:40 0.066 19:35 0.109 0.085 0.085 01/05/2020 04:40 3.01 21:40 3.76 3.35 04:40 0.51 10:30 0.68 0.58 04:40 0.070 21:35 0.120 0.094 0.094 01/06/2020 04:15 3.08 13:40 4.30 3.70 04:15 0.59 22:15 0.81 0.68 04:15 0.084 13:35 0.181 0.128 0.128 01/07/2020 05:35 2.96 12:10 4.45 3.63 05:35 0.54 12:10 0.84 0.69 05:35 0.072 12:10 0.202 0.126 0.126 01/08/2020 03:05 2.81 13:30 4.50 3.56 03:10 0.51 13:30 0.82 0.66 03:10 0.063 13:30 0.199 0.119 0.119 0.02 01/09/2020 04:00 2.82 13:40 4.58 3.63 04:25 0.53 11:40 0.79 0.66 04:25 0.066 11:40 0.197 0.122 0.122 0.18 01/10/2020 04:45 2.27 12:25 4.52 3.35 04:45 0.44 14:40 0.79 0.62 04:45 0.040 12:25 0.193 0.105 0.105 0.02 01/11/2020 06:05 2.68 12:20 3.62 2.96 05:55 0.49 10:40 0.68 0.58 05:55 0.057 12:20 0.118 0.078 0.078 0.01 01/12/2020 05:25 2.59 11:35 3.55 3.08 02:45 0.51 18:50 0.67 0.59 03:15 0.057 11:30 0.115 0.084 0.084 01/13/2020 04:15 2.71 13:30 4.56 3.56 03:50 0.50 14:10 0.79 0.65 03:50 0.060 13:30 0.190 0.117 0.117 0.02 01/14/2020 05:50 2.81 14:20 4.47 3.55 05:45 0.54 13:30 0.82 0.66 05:45 0.067 13:30 0.191 0.117 0.117 0.11 01/15/2020 04:35 2.78 13:35 4.31 3.52 05:30 0.52 13:55 0.78 0.65 05:30 0.063 13:30 0.175 0.115 0.115 0.07 01/16/2020 03:10 2.52 12:35 4.66 3.47 04:30 0.49 12:35 0.90 0.65 04:30 0.053 12:35 0.231 0.114 0.114 0.66 01/17/2020 05:45 2.65 13:50 4.59 3.69 23:15 0.47 10:25 0.75 0.59 05:45 0.059 13:35 0.173 0.111 0.111 01/18/2020 05:55 3.23 10:25 4.08 3.64 19:50 0.41 00:50 0.61 0.47 05:40 0.064 10:00 0.120 0.085 0.085 01/19/2020 05:45 3.37 10:50 4.21 3.74 05:50 0.38 04:35 0.59 0.45 05:50 0.061 19:50 0.112 0.085 0.085 01/20/2020 05:40 3.43 13:15 4.39 3.86 04:10 0.41 18:20 0.69 0.49 04:40 0.068 13:20 0.139 0.098 0.098 01/21/2020 03:25 3.10 13:55 5.06 3.86 03:25 0.57 13:55 0.88 0.67 03:25 0.081 13:55 0.253 0.135 0.135 01/22/2020 23:55 3.01 13:50 4.24 3.57 04:10 0.55 13:40 0.77 0.65 04:10 0.077 13:40 0.172 0.116 0.116 0.03 01/23/2020 04:35 2.88 14:10 4.30 3.56 02:45 0.54 14:15 0.76 0.66 04:40 0.070 14:15 0.175 0.117 0.117 01/24/2020 03:30 3.15 14:25 4.33 3.69 03:20 0.54 16:10 0.76 0.66 03:20 0.080 14:30 0.174 0.122 0.122 01/25/2020 06:55 3.23 01:30 4.08 3.46 06:45 0.56 01:30 0.71 0.61 06:55 0.085 01:30 0.150 0.103 0.103 01/26/2020 04:55 2.91 22:05 4.36 3.51 04:10 0.54 19:10 0.76 0.63 04:10 0.072 20:45 0.173 0.110 0.110 0.16 01/27/2020 23:55 3.53 09:20 4.87 4.19 23:45 0.63 09:15 0.82 0.71 23:55 0.108 09:15 0.224 0.157 0.157 01/28/2020 03:35 3.31 13:25 4.91 3.99 04:45 0.59 13:30 0.81 0.69 04:45 0.094 13:30 0.223 0.145 0.145 0.01 01/29/2020 02:50 3.38 10:05 4.68 3.96 01:55 0.59 17:05 0.79 0.70 23:55 0.098 10:05 0.197 0.143 0.143 01/30/2020 03:25 3.22 13:50 4.74 3.94 05:45 0.60 13:10 0.83 0.70 05:45 0.092 13:10 0.215 0.143 0.143 01/31/2020 04:05 3.39 11:00 5.13 3.96 03:05 0.58 10:50 0.87 0.69 03:05 0.097 10:55 0.252 0.142 0.142 02/01/2020 07:20 3.33 13:00 3.99 3.55 07:25 0.59 11:00 0.77 0.64 07:25 0.093 11:00 0.151 0.113 0.113 02/02/2020 23:30 2.95 21:20 3.84 3.32 23:30 0.51 21:20 0.70 0.61 23:30 0.068 21:20 0.135 0.096 0.096 02/03/2020 04:15 2.57 13:55 4.66 3.59 04:15 0.48 13:30 0.78 0.65 04:15 0.053 13:45 0.197 0.120 0.120 02/04/2020 03:25 3.07 13:20 4.65 3.72 23:30 0.54 13:15 0.84 0.67 23:30 0.077 13:15 0.215 0.129 0.129 02/05/2020 04:05 2.71 13:35 4.61 3.69 03:55 0.45 16:10 0.81 0.67 04:00 0.054 13:35 0.200 0.129 0.129 02/06/2020 23:50 3.35 09:30 4.84 3.89 02:45 0.60 09:20 0.87 0.72 02:45 0.097 09:20 0.234 0.145 0.145 02/07/2020 04:05 3.17 09:45 4.60 3.77 06:20 0.60 12:40 0.87 0.70 05:30 0.091 09:40 0.207 0.135 0.135 02/08/2020 04:15 3.30 13:25 3.92 3.61 04:05 0.59 08:40 0.72 0.65 04:05 0.093 13:25 0.139 0.117 0.117 02/09/2020 06:10 2.89 14:05 3.93 3.50 06:05 0.52 11:40 0.70 0.63 06:05 0.067 14:05 0.138 0.107 0.107 02/10/2020 05:00 3.09 13:25 4.69 3.75 05:15 0.56 14:20 0.81 0.68 05:15 0.083 13:25 0.207 0.130 0.130 02/11/2020 05:30 2.66 13:35 4.19 3.33 05:35 0.48 07:35 0.83 0.64 05:35 0.055 07:35 0.176 0.104 0.104 02/12/2020 04:55 2.56 14:15 4.22 3.24 05:00 0.47 14:15 0.79 0.64 05:00 0.051 14:15 0.177 0.101 0.101 02/13/2020 03:10 2.49 13:35 4.09 3.16 04:35 0.50 15:40 0.79 0.65 04:35 0.053 13:35 0.167 0.098 0.098 02/14/2020 04:10 2.41 13:35 3.78 3.07 04:30 0.45 12:20 0.75 0.62 04:35 0.045 13:35 0.139 0.090 0.090 02/15/2020 05:55 2.73 14:00 3.40 2.99 04:55 0.45 00:55 0.65 0.54 04:55 0.054 14:00 0.100 0.074 0.074 02/16/2020 04:50 2.69 11:55 3.61 3.05 04:45 0.46 19:55 0.67 0.55 04:45 0.054 11:55 0.117 0.077 0.077 02/17/2020 03:15 2.81 12:15 3.90 3.31 04:10 0.46 13:30 0.70 0.57 03:40 0.058 12:00 0.132 0.092 0.092 02/18/2020 03:45 2.79 13:45 4.86 3.99 23:45 0.41 13:55 0.70 0.54 03:45 0.055 13:55 0.188 0.113 0.113 02/19/2020 05:35 3.69 11:30 5.10 4.33 02:45 0.37 11:55 0.68 0.53 05:35 0.069 13:55 0.185 0.125 0.125 02/20/2020 06:00 3.18 14:20 4.75 3.93 04:00 0.37 10:25 0.79 0.54 04:00 0.056 10:25 0.203 0.113 0.113 02/21/2020 03:55 2.76 13:25 4.48 3.53 03:50 0.43 14:10 0.70 0.55 03:50 0.052 13:30 0.169 0.099 0.099 02/22/2020 03:05 2.35 20:25 3.40 2.84 03:00 0.31 09:55 0.55 0.44 03:00 0.029 09:55 0.087 0.056 0.056 02/23/2020 06:35 2.34 14:10 3.39 2.80 05:10 0.32 20:05 0.55 0.44 06:30 0.030 14:10 0.088 0.055 0.055 02/24/2020 04:10 2.34 14:15 4.75 3.60 02:05 0.31 13:15 0.64 0.47 02:05 0.031 13:25 0.164 0.088 0.088 32 1329
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 02/25/2020 04:30 2.86 16:30 4.82 3.96 04:40 0.27 10:00 0.60 0.42 04:40 0.035 13:30 0.153 0.089 0.089 02/26/2020 22:40 2.73 11:10 4.73 3.60 04:00 0.19 12:05 0.80 0.48 04:00 0.028 14:30 0.180 0.089 0.089 02/27/2020 04:45 2.33 13:30 4.55 3.32 03:45 0.33 13:30 0.70 0.51 03:45 0.031 13:30 0.173 0.086 0.086 02/28/2020 05:50 2.14 11:45 4.13 3.06 05:55 0.29 14:40 0.77 0.50 05:55 0.024 14:40 0.156 0.075 0.075 02/29/2020 05:40 2.37 18:55 3.32 2.80 05:20 0.34 15:20 0.57 0.45 05:20 0.033 15:20 0.086 0.057 0.057 03/01/2020 05:20 2.33 11:40 3.68 2.83 05:35 0.34 11:35 0.71 0.48 05:35 0.032 11:35 0.127 0.062 0.062 03/02/2020 03:20 2.42 13:20 4.39 3.20 03:30 0.39 13:50 0.80 0.55 03:30 0.039 13:20 0.181 0.087 0.087 03/03/2020 03:40 2.43 13:25 4.60 3.34 02:45 0.32 10:10 0.75 0.54 03:35 0.032 13:15 0.188 0.093 0.093 03/04/2020 04:00 2.24 10:50 4.19 3.06 03:50 0.34 13:50 0.85 0.55 03:50 0.030 13:50 0.180 0.082 0.082 03/05/2020 03:45 2.14 13:05 4.09 2.97 05:00 0.31 13:50 0.80 0.56 05:00 0.027 14:00 0.168 0.081 0.081 03/06/2020 03:20 1.98 13:30 4.29 2.83 03:20 0.32 13:25 0.86 0.55 03:20 0.024 13:25 0.189 0.075 0.075 03/07/2020 03:55 2.01 16:15 3.02 2.48 03:50 0.34 16:35 0.66 0.49 03:50 0.026 16:35 0.089 0.052 0.052 03/08/2020 05:25 2.03 14:05 3.00 2.40 04:35 0.35 14:05 0.67 0.49 04:35 0.028 14:05 0.091 0.050 0.050 03/09/2020 03:00 1.84 10:50 3.95 2.82 05:15 0.32 10:30 0.82 0.58 03:25 0.022 10:30 0.161 0.079 0.079 Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Rain
(in)
Avg
Total

3.46 0.59

11.840

0.103

4.90 Report Summary For The Period 11/16/2019 00:00 - 03/09/2020 23:59 33 1330
Item # 16.

Site Commentary
Site Information
MIL_0386
Pipe Dimensions 18
Silt Level 0.00"
Overview
Site MIL_0386 functioned under normal conditions during the period Saturday, November 16, 2019 to Monday, March 9, 2020 . This site exhibited an observable response to the wet weather events of November 26, 2019 - November 27, 2019, December 7, 2019 - December 8, 2019, and January 16, 2020 - January 17, 2020. Review of the scattergraph shows free flow conditions during the study period.

Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted to date and support the relative accuracy of the flow monitor at this location.

This location was installed upstream of sites MIL_0649 and MIL_2491. (See MIL_0649 and MIL_2491 Site Commentary for More Details)
Observations
Average flow depth, velocity, and quantity data observed during Saturday, November 16, 2019 to Monday, March 9, 2020 , along with observed minimum and maximum data, are provided in the following table.

Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 6.43 1.38 0.512
Minimum 5.11 0.93 0.262
Maximum 9.17 2.04 1.187
Time of Minimum 2/9/2020 4:10 AM 12/26/2019 2:40 AM 12/26/2019 2:40 AM Time of Maximum 2/6/2020 1:35 PM 1/16/2020 10:45 AM 2/6/2020 1:35 PM Data Quality
Data uptime observed during the Saturday, November 16, 2019 to the Monday, March 9, 2020 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.

Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
34 1331
Item # 16.

Latitude: 37.430913°
Longitude: -121.898992°
Site Sketch Profile View or Photo
Sensor Shot
22431.11.325
Additional Site Info. / Comments:

ADS Project Name:

ADS Project Number:

Milpitas.WWTFM.CA2019-2020
Wireless
Pipe Material
Antenna Location
Communication Information:

Drilled Pavement / Concrete
No
Concrete
Unbolted Normal
Good
Active Drop Connections Air Quality:

Communication Type
Normal
26'' 54''
Manhole Cover Manhole Frame
Pipe Condition:

Manhole Material:

Manhole Diameter (Approx.):

Manhole Depth (Approx. FT): Manhole Configuration
Concrete Good
14'
Manhole Condition:

Upstream 0-5 FT Manhole
Sensors / Devices:

Installation Confirmation:

Manhole Opening Diameter (in)
Silt Type
Hydraulic Comments:
0''
Single

0.25"
Manhole / Pipe Information:

Pressure Sensor Range (psi)
Confirmation Time:

Peak Combo (CS4)
Pipe Size (HxW)

0.0"
Downlooker Physical Offset (in) Measurement Confidence (in) NA
Peak Velocity (fps)
Silt (in)
8:54:00 AM 18.00"x18.00"
Smooth flow with medium depth and moderate velocity
0 - 5 psi
Depth of Flow (Wet DOF) (in) Range (Air DOF) (in)

7.25"
Velocity Sensor Offset (in)

1.76'
Installation Information
Circular
Monitor Series
Monitor Location:

Doppler Standard Ring and Crank
Manhole #
Installation Date:

Pipe Size (H x W)
Topside / Area Photo
Friday, November 15, 2019
Access
Temporary

18.00"x18.00"
Traffic
#0386 Residential/Commercial
Map
Installation Type:

Monitoring Location (Sensors):

MIL_0386
TRITON+
System Characteristics
Location Type
Pipe Shape DRIVE.

Milpitas Temp Study 2019-20
Drive Medium
Site Access Details:

Site Address /Location:

Site Name
Milpitas Blvd and Los Coches St, Milpitas, CA
Flow Monitoring
Site Report
North Outlet
South Inlet
(Sensor Location)
35 1332
Item # 16.
36 1333
Item # 16.
37 1334
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 11/16/2019 22:30 5.72 14:55 6.75 6.11 16:20 1.11 14:55 1.42 1.27 16:20 0.360 14:55 0.557 0.434 0.434 11/17/2019 06:15 5.34 19:25 6.81 5.80 16:55 0.97 19:15 1.42 1.20 16:55 0.295 19:20 0.560 0.382 0.382 11/18/2019 00:35 5.50 13:15 8.86 6.79 02:55 1.09 13:10 1.87 1.40 00:35 0.334 13:15 1.046 0.564 0.564 11/19/2019 04:35 5.95 15:20 9.13 6.85 02:55 1.23 15:00 1.95 1.44 04:30 0.415 15:00 1.109 0.581 0.581 11/20/2019 23:25 5.95 09:30 8.58 6.73 15:40 1.19 10:15 1.83 1.41 03:15 0.417 10:15 0.976 0.557 0.557 11/21/2019 04:40 5.86 09:45 7.84 6.69 04:40 1.22 09:45 1.65 1.40 04:40 0.392 09:45 0.790 0.545 0.545 11/22/2019 04:10 5.75 14:35 7.98 6.74 11:50 1.18 10:00 1.68 1.39 04:25 0.384 08:05 0.813 0.550 0.550 11/23/2019 04:40 5.58 06:50 7.14 6.26 04:40 1.11 08:40 1.50 1.29 04:40 0.336 08:40 0.630 0.458 0.458 11/24/2019 03:10 5.42 11:05 7.13 5.97 00:45 1.00 11:05 1.50 1.23 00:45 0.310 11:05 0.632 0.409 0.409 11/25/2019 00:00 5.54 08:40 8.17 6.61 01:45 1.12 08:40 1.77 1.38 00:15 0.338 08:40 0.890 0.532 0.532 11/26/2019 04:00 6.11 16:30 8.15 6.84 03:30 1.12 16:30 1.70 1.43 03:30 0.402 16:30 0.854 0.572 0.572 0.36 11/27/2019 00:10 6.10 09:50 7.64 6.78 20:50 1.16 08:35 1.62 1.41 20:50 0.430 09:45 0.745 0.557 0.557 0.63 11/28/2019 20:00 5.34 02:55 6.98 5.85 10:45 0.98 02:50 1.41 1.20 20:00 0.299 02:50 0.578 0.388 0.388 11/29/2019 04:00 5.43 07:10 6.91 5.81 03:10 0.96 07:05 1.47 1.17 03:10 0.282 07:05 0.593 0.375 0.375 0.02 11/30/2019 06:15 5.40 17:30 6.70 5.75 01:20 0.95 10:45 1.38 1.17 01:20 0.277 17:30 0.516 0.370 0.370 0.10 12/01/2019 03:10 5.38 21:20 7.14 5.92 13:30 1.05 21:25 1.46 1.21 04:30 0.311 21:20 0.613 0.398 0.398 0.06 12/02/2019 03:55 5.70 11:10 7.83 6.72 00:30 1.12 11:05 1.67 1.42 00:30 0.348 11:10 0.792 0.559 0.559 0.30 12/03/2019 03:55 5.96 09:55 7.99 6.80 04:00 1.28 13:05 1.64 1.45 04:00 0.422 10:00 0.792 0.578 0.578 0.01 12/04/2019 00:15 6.04 09:35 8.27 6.96 16:00 1.29 09:25 1.75 1.50 00:10 0.455 09:25 0.893 0.614 0.614 0.39 12/05/2019 03:40 6.08 13:35 8.08 6.90 23:55 1.26 14:50 1.67 1.45 02:15 0.446 13:40 0.828 0.590 0.590 0.01 12/06/2019 00:35 6.08 09:20 8.26 6.83 01:05 1.24 09:15 1.72 1.44 00:30 0.422 09:15 0.875 0.576 0.576 0.01 12/07/2019 23:55 5.61 12:25 7.69 6.39 13:30 1.12 12:05 1.61 1.34 23:55 0.357 12:25 0.745 0.491 0.491 0.67 12/08/2019 03:35 5.56 15:40 7.18 5.97 21:05 1.09 14:10 1.52 1.26 03:35 0.338 15:40 0.605 0.418 0.418 0.20 12/09/2019 04:45 5.68 13:15 7.99 6.74 01:10 1.14 13:15 1.71 1.43 01:10 0.368 13:15 0.835 0.564 0.564 12/10/2019 04:45 5.93 15:10 7.90 6.78 04:25 1.25 16:30 1.70 1.44 04:25 0.416 15:10 0.813 0.571 0.571 12/11/2019 04:50 5.88 11:05 7.72 6.69 05:00 1.27 12:50 1.78 1.43 04:45 0.411 12:50 0.811 0.559 0.559 0.03 12/12/2019 05:00 5.92 12:10 7.98 6.82 03:50 1.28 10:30 1.69 1.44 03:55 0.423 12:20 0.824 0.577 0.577 0.01 12/13/2019 04:40 5.97 14:10 7.87 6.79 01:25 1.29 14:00 1.61 1.44 04:35 0.432 14:00 0.765 0.570 0.570 0.01 12/14/2019 06:10 5.72 12:55 7.28 6.39 06:10 1.18 12:55 1.60 1.32 06:10 0.368 12:55 0.693 0.483 0.483 0.01 12/15/2019 06:05 5.55 06:35 7.19 6.04 11:40 1.08 06:40 1.53 1.27 06:05 0.338 06:40 0.644 0.428 0.428 0.01 12/16/2019 03:25 5.72 11:10 8.53 6.73 00:50 1.17 11:10 1.75 1.41 03:25 0.372 11:10 0.931 0.557 0.557 0.01 12/17/2019 05:00 6.01 10:35 8.28 6.93 00:10 1.25 10:35 1.76 1.45 05:15 0.432 10:35 0.900 0.593 0.593 0.01 12/18/2019 03:15 5.93 09:20 8.48 6.89 03:10 1.26 09:20 1.80 1.43 03:10 0.414 09:20 0.952 0.583 0.583 0.01 12/19/2019 05:55 6.04 10:30 8.31 6.93 05:55 1.25 10:25 1.71 1.42 05:55 0.419 10:30 0.880 0.584 0.584 12/20/2019 04:05 5.76 12:50 8.05 6.74 21:10 1.13 17:00 1.68 1.39 04:05 0.381 17:05 0.822 0.550 0.550 12/21/2019 04:15 5.60 09:25 7.29 6.25 03:00 1.02 11:10 1.52 1.27 03:00 0.319 09:30 0.657 0.452 0.452 0.01 12/22/2019 03:20 5.43 14:25 7.01 5.93 23:25 1.04 14:20 1.49 1.22 03:25 0.313 14:25 0.607 0.402 0.402 0.41 12/23/2019 05:50 5.50 09:50 6.95 6.12 04:50 1.00 07:30 1.53 1.25 04:50 0.308 07:30 0.604 0.429 0.429 12/24/2019 20:20 5.23 07:10 6.67 5.68 22:25 0.98 07:05 1.38 1.18 22:25 0.275 07:05 0.531 0.367 0.367 0.02 12/25/2019 03:55 5.20 15:55 6.31 5.42 21:25 1.01 15:55 1.31 1.11 05:40 0.279 15:55 0.469 0.323 0.323 0.08 12/26/2019 04:40 5.26 13:20 7.15 6.15 02:40 0.93 11:10 1.51 1.25 02:40 0.262 11:10 0.636 0.437 0.437 12/27/2019 00:40 5.66 11:05 8.06 6.27 03:25 1.07 11:05 1.64 1.27 03:25 0.328 11:05 0.812 0.457 0.457 12/28/2019 05:55 5.64 10:20 8.01 6.18 23:05 1.00 10:10 1.68 1.26 23:05 0.312 10:20 0.817 0.442 0.442 12/29/2019 23:55 5.46 05:15 6.77 5.83 09:50 1.03 06:00 1.44 1.21 09:50 0.311 05:10 0.542 0.388 0.388 0.22 12/30/2019 04:40 5.38 10:10 6.95 5.96 02:30 1.05 08:45 1.46 1.23 04:35 0.304 10:10 0.586 0.407 0.407 12/31/2019 04:55 5.30 08:40 7.04 5.71 22:00 0.98 07:25 1.46 1.20 22:00 0.280 08:35 0.583 0.375 0.375 0.01 Daily Tabular Report
Daily Tabular Report For The Period 11/16/2019 00:00 - 03/09/2020 23:59 MIL_0386, Pipe Height: 18.00 in, Silt: 0.00 in
38 1335
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 01/01/2020 06:25 5.16 13:40 5.66 5.37 05:50 0.99 13:40 1.26 1.14 05:50 0.274 13:40 0.388 0.326 0.326 01/02/2020 03:20 5.20 07:15 8.56 6.25 03:10 1.01 07:20 1.85 1.31 03:10 0.278 07:15 0.988 0.471 0.471 01/03/2020 01:45 5.66 12:30 7.75 6.41 00:40 1.13 12:20 1.71 1.35 04:55 0.354 12:20 0.799 0.501 0.501 01/04/2020 23:55 5.63 10:30 7.39 6.34 03:55 1.18 10:25 1.57 1.35 03:55 0.370 10:25 0.694 0.489 0.489 01/05/2020 03:25 5.43 07:05 7.24 5.90 22:50 1.07 05:45 1.59 1.28 22:50 0.335 07:05 0.666 0.419 0.419 01/06/2020 01:05 5.58 13:00 7.78 6.56 01:15 1.22 12:50 1.77 1.45 01:15 0.370 12:50 0.831 0.550 0.550 01/07/2020 03:45 5.76 14:20 7.85 6.63 00:35 1.31 14:20 1.80 1.47 03:40 0.413 14:20 0.860 0.566 0.566 01/08/2020 05:45 5.81 15:05 7.66 6.58 05:45 1.31 10:30 1.70 1.46 05:45 0.419 10:35 0.779 0.557 0.557 0.02 01/09/2020 03:30 5.78 10:00 7.94 6.64 15:40 1.30 10:45 1.75 1.49 03:30 0.416 10:45 0.848 0.574 0.574 0.18 01/10/2020 05:30 5.65 10:35 7.90 6.48 20:30 1.30 10:25 1.80 1.46 05:30 0.404 10:30 0.864 0.548 0.548 0.02 01/11/2020 03:45 5.31 18:00 7.01 5.83 23:55 1.16 17:45 1.55 1.31 04:45 0.331 17:55 0.632 0.421 0.421 0.01 01/12/2020 03:35 5.53 09:00 6.88 5.83 10:50 1.07 08:45 1.53 1.29 01:30 0.334 09:00 0.612 0.416 0.416 01/13/2020 04:30 5.74 17:35 7.65 6.56 00:00 1.27 13:00 1.69 1.47 00:05 0.400 13:00 0.778 0.557 0.557 0.02 01/14/2020 04:55 5.59 13:05 7.67 6.46 16:25 1.16 10:05 1.69 1.45 04:50 0.390 13:05 0.771 0.538 0.538 0.11 01/15/2020 04:55 5.62 12:15 7.56 6.48 04:20 1.31 11:45 1.68 1.45 04:55 0.400 11:45 0.746 0.539 0.539 0.07 01/16/2020 04:00 5.69 14:00 8.78 6.74 04:10 1.31 10:45 2.04 1.49 04:00 0.406 13:50 1.097 0.588 0.588 0.66 01/17/2020 04:30 5.83 15:00 8.83 6.72 04:30 1.29 15:00 1.90 1.46 04:30 0.414 15:00 1.058 0.574 0.574 01/18/2020 22:45 5.41 16:05 6.86 5.76 22:45 1.15 16:10 1.45 1.25 22:45 0.332 16:10 0.580 0.396 0.396 01/19/2020 04:40 5.20 08:45 6.94 5.66 04:35 1.12 08:45 1.50 1.24 04:35 0.307 08:45 0.609 0.384 0.384 01/20/2020 00:05 5.56 12:25 8.11 6.65 04:35 1.21 12:20 1.77 1.45 00:25 0.371 12:25 0.881 0.562 0.562 01/21/2020 05:20 5.67 12:40 8.18 6.61 05:20 1.26 14:00 1.89 1.44 05:20 0.389 14:00 0.938 0.552 0.552 01/22/2020 00:45 5.95 17:00 7.99 6.74 00:45 1.30 17:00 1.75 1.46 00:45 0.427 17:00 0.855 0.574 0.574 0.03 01/23/2020 00:30 5.86 14:55 8.36 6.79 05:55 1.31 14:50 1.96 1.49 06:00 0.424 14:50 1.004 0.593 0.593 01/24/2020 01:40 6.04 11:00 8.67 6.90 03:15 1.31 10:50 2.01 1.52 01:40 0.450 10:55 1.078 0.617 0.617 01/25/2020 22:30 5.50 07:00 6.85 6.08 22:20 1.04 06:20 1.50 1.31 22:20 0.313 06:20 0.594 0.447 0.447 01/26/2020 05:05 5.29 00:15 6.25 5.71 02:25 1.09 00:10 1.40 1.25 04:50 0.310 00:10 0.494 0.389 0.389 0.16 01/27/2020 00:40 5.84 10:40 8.42 6.83 00:20 1.27 10:35 1.86 1.46 00:40 0.413 10:35 0.974 0.588 0.588 01/28/2020 04:50 6.06 13:10 7.91 6.83 04:40 1.32 13:10 1.71 1.47 04:45 0.449 13:10 0.828 0.590 0.590 0.01 01/29/2020 04:40 5.93 08:15 8.02 6.76 03:20 1.24 08:00 1.74 1.46 03:20 0.422 08:20 0.848 0.578 0.578 01/30/2020 04:55 6.08 11:05 8.09 6.81 11:45 1.33 11:00 1.72 1.47 05:00 0.456 11:00 0.851 0.588 0.588 01/31/2020 05:05 6.06 12:30 8.18 6.84 05:00 1.33 12:30 1.74 1.48 05:05 0.450 12:30 0.876 0.593 0.593 02/01/2020 23:55 5.46 14:15 7.17 6.12 23:50 1.20 14:15 1.58 1.36 23:50 0.352 14:15 0.670 0.470 0.470 02/02/2020 02:25 5.23 15:15 6.83 5.73 03:20 1.11 15:05 1.50 1.27 03:20 0.312 15:10 0.591 0.398 0.398 02/03/2020 02:20 5.74 13:10 8.54 6.79 22:45 1.20 13:05 1.90 1.46 02:25 0.394 13:05 1.010 0.585 0.585 02/04/2020 03:55 5.94 11:05 7.86 6.77 22:10 1.27 10:25 1.69 1.46 03:50 0.430 10:25 0.797 0.580 0.580 02/05/2020 06:40 6.04 09:45 8.07 6.90 17:45 1.30 08:25 1.77 1.49 06:20 0.442 09:40 0.875 0.604 0.604 02/06/2020 04:40 5.87 13:35 9.17 6.75 04:40 1.29 13:35 2.03 1.48 04:40 0.416 13:35 1.187 0.584 0.584 02/07/2020 02:05 5.99 11:25 7.98 6.73 15:35 1.31 11:15 1.78 1.48 02:10 0.445 11:15 0.855 0.580 0.580 02/08/2020 23:50 5.25 14:35 6.79 5.85 23:50 1.13 14:40 1.47 1.29 23:50 0.313 14:35 0.579 0.418 0.418 02/09/2020 04:10 5.11 01:40 6.27 5.62 03:30 1.00 00:20 1.38 1.24 03:30 0.280 01:40 0.477 0.378 0.378 02/10/2020 04:55 5.33 09:00 7.84 6.66 04:55 1.20 11:30 1.77 1.45 04:55 0.340 11:30 0.841 0.563 0.563 02/11/2020 06:05 6.04 11:35 7.73 6.80 04:50 1.31 10:15 1.67 1.47 04:55 0.442 11:35 0.779 0.584 0.584 02/12/2020 04:00 5.95 09:35 7.82 6.82 04:15 1.31 11:50 1.72 1.49 04:15 0.431 11:50 0.817 0.593 0.593 02/13/2020 05:20 6.07 10:20 7.93 6.83 01:50 1.34 10:05 1.75 1.48 01:50 0.462 10:15 0.838 0.593 0.593 02/14/2020 06:05 5.96 13:15 7.72 6.75 16:25 1.25 10:25 1.67 1.46 06:00 0.430 10:25 0.777 0.577 0.577 02/15/2020 23:05 5.56 17:10 6.63 5.93 22:35 1.15 17:05 1.44 1.30 22:35 0.349 17:05 0.548 0.428 0.428 02/16/2020 01:55 5.41 18:55 6.93 5.89 00:40 1.10 18:55 1.50 1.28 00:40 0.328 18:55 0.608 0.418 0.418 02/17/2020 01:35 5.60 13:45 7.68 6.25 03:35 1.09 13:45 1.55 1.31 03:35 0.337 13:45 0.719 0.467 0.467 02/18/2020 00:00 5.81 12:10 8.37 6.96 00:00 1.21 08:45 1.73 1.47 00:00 0.387 12:15 0.883 0.607 0.607 02/19/2020 05:40 6.09 09:40 8.43 6.98 02:25 1.33 09:35 1.78 1.49 02:25 0.454 09:35 0.933 0.614 0.614 02/20/2020 02:30 5.95 16:25 8.21 6.95 02:35 1.31 16:30 1.74 1.49 02:30 0.431 16:30 0.880 0.612 0.612 02/21/2020 07:10 6.09 13:20 7.89 6.86 00:35 1.33 12:30 1.71 1.47 07:10 0.461 12:30 0.813 0.592 0.592 02/22/2020 23:10 5.58 12:30 8.05 6.34 23:45 1.01 12:30 1.69 1.35 23:45 0.312 12:30 0.838 0.491 0.491 02/23/2020 03:50 5.50 23:25 6.61 5.93 06:35 1.11 02:05 1.39 1.27 03:50 0.338 02:25 0.514 0.418 0.418 02/24/2020 04:45 5.87 10:55 8.81 6.87 02:20 1.24 10:45 1.87 1.45 04:40 0.404 10:50 1.032 0.589 0.589 39 1336
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 02/25/2020 04:35 5.79 09:30 7.84 6.74 04:30 1.27 09:20 1.71 1.45 04:30 0.405 09:25 0.814 0.569 0.569 02/26/2020 04:35 5.77 14:20 7.91 6.76 04:00 1.25 13:15 1.66 1.47 04:00 0.395 13:30 0.789 0.580 0.580 02/27/2020 02:05 5.82 12:25 8.09 6.76 17:40 1.25 12:25 1.79 1.48 02:05 0.424 12:25 0.893 0.583 0.583 02/28/2020 00:35 5.92 14:45 7.85 6.79 00:40 1.32 12:40 1.68 1.48 00:35 0.432 14:45 0.792 0.589 0.589 02/29/2020 02:50 5.53 10:10 7.26 6.08 22:55 1.12 10:00 1.56 1.33 20:50 0.358 10:10 0.673 0.454 0.454 03/01/2020 03:20 5.20 18:05 7.05 5.66 03:00 1.00 18:05 1.53 1.25 03:00 0.273 18:05 0.636 0.387 0.387 03/02/2020 03:25 5.55 09:20 7.66 6.56 02:50 1.22 09:05 1.68 1.43 02:55 0.366 09:15 0.770 0.545 0.545 03/03/2020 04:45 5.92 11:35 7.83 6.68 04:35 1.32 11:35 1.73 1.46 04:35 0.432 11:35 0.827 0.566 0.566 03/04/2020 06:10 5.93 12:10 8.10 6.75 03:20 1.32 12:10 1.77 1.48 03:20 0.434 12:10 0.882 0.582 0.582 03/05/2020 04:20 5.83 12:00 7.83 6.69 04:40 1.27 10:50 1.65 1.47 04:40 0.409 12:05 0.769 0.572 0.572 03/06/2020 01:55 5.48 08:45 7.65 6.65 01:55 1.28 08:25 1.66 1.47 01:55 0.376 08:25 0.744 0.566 0.566 03/07/2020 02:00 5.39 08:00 7.36 6.06 01:45 1.17 08:00 1.62 1.35 01:45 0.341 08:00 0.709 0.459 0.459 03/08/2020 02:00 5.24 13:35 6.52 5.65 18:20 1.10 13:35 1.46 1.26 03:50 0.316 13:35 0.544 0.390 0.390 03/09/2020 04:00 5.52 12:25 8.08 6.66 01:15 1.20 09:05 1.77 1.46 03:50 0.361 12:20 0.875 0.570 0.569 Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Rain
(in)
Avg
Total

6.43 1.38

58.839

0.512

4.90 Report Summary For The Period 11/16/2019 00:00 - 03/09/2020 23:59 40 1337
Item # 16.

Site Commentary
Site Information
MIL_0602
Pipe Dimensions 18
Silt Level 0.00"
Overview
Site MIL_0602 functioned under normal conditions during the period Saturday, November 16, 2019 to Monday, March 9, 2020 . This site exhibited an observable response to the wet weather events of November 26, 2019 - November 27, 2019, December 7, 2019 - December 8, 2019, and January 16, 2020 - January 17, 2020. Review of the scattergraph shows free flow conditions during the study period.

Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted to date and support the relative accuracy of the flow monitor at this location.

Observations
Average flow depth, velocity, and quantity data observed during Saturday, November 16, 2019 to Monday, March 9, 2020 , along with observed minimum and maximum data, are provided in the following table.

Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 3.67 1.53 0.274
Minimum 1.21 0.39 0.014
Maximum 6.31 2.37 0.844
Time of Minimum 3/7/2020 5:50 AM 3/9/2020 4:30 AM 3/9/2020 5:55 AM Time of Maximum 1/7/2020 8:40 AM 1/7/2020 8:40 AM 1/7/2020 8:40 AM Data Quality
Data uptime observed during the Saturday, November 16, 2019 to the Monday, March 9, 2020 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.

Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
41 1338
Item # 16.

Latitude: 37.424137°
Longitude: -121.905174°
Site Sketch Profile View or Photo
Sensor Shot
22431
Additional Site Info. / Comments:

ADS Project Name:

ADS Project Number:

Milpitas.WWTFM.CA19-20
Wireless
Pipe Material
Antenna Location
Communication Information:

Manhole Pick / Vent Hole
No
Concrete
Unbolted Normal
Good
Active Drop Connections Air Quality:

Communication Type
Normal
26'' 54''
Manhole Cover Manhole Frame
Pipe Condition:

Manhole Material:

Manhole Diameter (Approx.):

Manhole Depth (Approx. FT): Manhole Configuration
Concrete Good
7'
Manhole Condition:

Upstream 0-5 FT Manhole
Sensors / Devices:

Installation Confirmation:

Manhole Opening Diameter (in)
Silt Type
Hydraulic Comments:
0''
Single

0.25"
Manhole / Pipe Information:

Pressure Sensor Range (psi)
Confirmation Time:

0.00"
Peak Combo (CS4)
Pipe Size (HxW)
0''
Downlooker Physical Offset (in) Measurement Confidence (in) NA
Peak Velocity (fps)
Silt (in)
9:11:40 AM 18.0" x 18.0"
Smooth flow with medium depth and moderate velocity
0 - 5 psi
Depth of Flow (Wet DOF) (in) Range (Air DOF) (in)

6.25 Velocity Sensor Offset (in)

1.52 Installation Information
Circular
Monitor Series
Monitor Location:

Doppler Standard Ring and Crank
Manhole #
Installation Date:

Pipe Size (H x W)
Topside / Area Photo
Tuesday, November 12, 2019
Access
Temporary

18.0" x 18.0"
Traffic
602 Residential/Commercial
Map
Installation Type:

Monitoring Location (Sensors):

MIL_0602
TRITON+
System Characteristics
Location Type
Pipe Shape Parking lane
Milpitas Temp Study 2019-20
Drive Light
Site Access Details:

Site Address /Location:

Site Name
Main St and Curtis Ave
Flow Monitoring
Site Report
South Inlet
(Sensors location)
North Outlet
42 1339
Item # 16.
43 1340
Item # 16.
44 1341
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 11/16/2019 03:55 3.43 12:05 4.79 4.22 05:55 1.45 12:35 1.95 1.74 05:55 0.222 11:55 0.473 0.361 0.361 11/17/2019 06:00 3.44 13:00 4.96 4.37 05:00 1.48 15:05 2.01 1.78 06:05 0.226 11:20 0.502 0.388 0.388 11/18/2019 04:40 3.52 08:45 5.09 4.35 03:50 1.47 08:30 1.99 1.75 04:40 0.233 08:30 0.527 0.379 0.379 11/19/2019 04:25 3.57 08:55 5.11 4.40 04:35 1.49 08:45 2.00 1.76 04:35 0.240 08:45 0.531 0.386 0.386 11/20/2019 04:20 3.46 08:55 5.21 4.41 03:10 1.44 09:15 2.05 1.76 04:20 0.225 09:15 0.557 0.387 0.387 11/21/2019 04:35 3.44 09:05 5.26 4.42 04:25 1.45 08:55 2.07 1.76 04:25 0.222 08:55 0.571 0.390 0.390 11/22/2019 03:55 3.41 08:45 5.30 4.43 05:10 1.44 09:00 2.06 1.76 05:10 0.217 09:00 0.578 0.392 0.392 11/23/2019 05:00 3.54 12:50 5.29 4.53 03:30 1.47 12:20 2.03 1.78 05:05 0.236 12:20 0.565 0.410 0.410 11/24/2019 05:40 3.48 12:15 5.21 4.51 04:45 1.45 12:05 2.05 1.78 05:40 0.225 12:05 0.560 0.407 0.407 11/25/2019 04:40 3.53 09:20 5.17 4.44 04:35 1.48 09:25 2.01 1.76 04:40 0.234 09:25 0.545 0.391 0.391 11/26/2019 05:00 3.53 10:05 5.16 4.34 04:55 1.45 20:50 2.03 1.73 04:55 0.229 20:50 0.540 0.373 0.373 0.36 11/27/2019 05:25 3.13 09:50 5.00 4.24 05:30 1.33 09:25 1.93 1.71 05:30 0.176 10:00 0.495 0.358 0.358 0.63 11/28/2019 06:30 3.20 12:15 4.99 4.12 05:45 1.36 12:45 1.99 1.68 05:45 0.188 12:45 0.508 0.339 0.339 11/29/2019 05:25 3.23 12:05 4.96 4.26 05:10 1.38 11:30 1.94 1.73 05:10 0.192 12:10 0.495 0.364 0.364 0.02 11/30/2019 05:50 3.11 12:45 4.98 4.20 05:35 1.34 12:25 2.09 1.72 05:40 0.178 12:25 0.523 0.359 0.359 0.10 12/01/2019 05:50 3.16 12:50 4.97 4.26 05:35 1.35 11:35 2.09 1.74 05:35 0.184 11:35 0.512 0.371 0.371 0.06 12/02/2019 04:45 3.27 09:20 5.08 4.22 03:55 1.38 09:25 2.18 1.72 04:50 0.195 09:25 0.574 0.358 0.358 0.30 12/03/2019 05:05 3.20 08:45 4.86 4.12 05:05 1.35 20:10 2.02 1.68 05:05 0.185 20:10 0.484 0.339 0.339 0.01 12/04/2019 03:20 3.25 08:55 4.96 4.11 02:30 1.35 08:40 1.93 1.67 03:15 0.192 08:45 0.491 0.335 0.335 0.39 12/05/2019 05:05 3.07 08:40 4.79 3.83 04:45 1.30 08:35 1.88 1.58 05:05 0.169 08:35 0.458 0.286 0.286 0.01 12/06/2019 04:30 2.77 09:00 4.35 3.49 02:55 1.19 08:55 1.77 1.46 04:35 0.133 08:55 0.375 0.232 0.232 0.01 12/07/2019 05:55 2.67 18:50 4.84 3.62 05:40 1.14 18:45 1.96 1.50 05:40 0.121 18:45 0.483 0.256 0.256 0.67 12/08/2019 06:10 2.80 12:25 4.12 3.61 05:30 1.19 13:10 1.69 1.50 06:25 0.136 13:10 0.329 0.250 0.250 0.20 12/09/2019 05:20 2.74 09:00 4.03 3.40 05:15 1.17 08:55 1.66 1.44 05:15 0.129 08:55 0.315 0.219 0.219 12/10/2019 05:10 2.61 09:05 3.96 3.26 04:15 1.08 08:10 1.70 1.39 04:15 0.112 08:40 0.304 0.200 0.200 12/11/2019 05:00 2.40 08:50 3.89 3.18 04:20 1.02 08:45 1.63 1.35 05:05 0.093 08:45 0.296 0.189 0.189 0.03 12/12/2019 05:35 2.53 08:40 3.78 3.16 05:30 1.10 08:40 1.60 1.36 05:30 0.107 08:40 0.279 0.187 0.187 0.01 12/13/2019 04:30 2.37 09:00 3.63 3.04 04:10 1.00 09:45 1.55 1.31 04:25 0.089 08:45 0.252 0.170 0.170 0.01 12/14/2019 05:25 2.28 13:30 3.62 3.03 05:45 0.97 11:45 1.57 1.30 05:45 0.081 11:45 0.253 0.170 0.170 0.01 12/15/2019 06:05 2.23 11:20 4.43 3.25 06:40 0.93 11:20 1.80 1.37 05:55 0.077 11:20 0.393 0.205 0.205 0.01 12/16/2019 05:20 2.60 09:40 3.87 3.28 05:10 1.04 08:45 1.61 1.39 05:10 0.105 09:40 0.288 0.202 0.202 0.01 12/17/2019 05:10 2.51 09:20 3.86 3.28 05:00 1.07 09:25 1.61 1.39 05:00 0.103 09:25 0.288 0.202 0.202 0.01 12/18/2019 04:50 2.55 21:45 4.78 3.68 04:15 1.08 21:40 1.92 1.52 04:55 0.107 21:45 0.467 0.270 0.270 0.01 12/19/2019 04:40 3.19 09:10 4.95 4.25 04:40 1.32 08:55 1.99 1.69 04:40 0.181 09:00 0.506 0.355 0.355 12/20/2019 05:05 3.16 09:40 4.98 4.25 03:45 1.32 09:40 1.98 1.68 05:10 0.179 09:40 0.511 0.354 0.354 12/21/2019 05:25 3.23 12:20 5.04 4.32 05:30 1.35 11:35 1.96 1.70 05:30 0.188 11:40 0.508 0.368 0.368 0.01 12/22/2019 06:00 3.22 13:30 5.28 4.35 04:30 1.34 13:35 2.05 1.71 04:35 0.186 13:35 0.573 0.374 0.374 0.41 12/23/2019 05:35 3.32 13:15 5.71 4.47 05:30 1.35 12:15 2.19 1.73 05:30 0.195 12:15 0.666 0.396 0.396 12/24/2019 05:05 3.16 12:05 4.87 4.19 04:55 1.27 10:40 1.88 1.64 04:55 0.173 12:05 0.467 0.339 0.339 0.02 12/25/2019 04:55 3.15 12:25 4.75 4.00 05:00 1.29 19:25 1.87 1.59 04:55 0.173 12:20 0.444 0.308 0.308 0.08 12/26/2019 05:00 3.18 12:05 4.75 4.18 05:10 1.30 22:50 1.87 1.64 04:55 0.177 10:55 0.440 0.337 0.337 12/27/2019 04:20 3.10 13:20 4.71 4.11 04:15 1.28 09:45 1.96 1.62 04:15 0.168 09:45 0.443 0.326 0.326 12/28/2019 04:35 2.91 12:30 4.79 4.00 04:30 1.21 12:20 1.88 1.59 04:30 0.145 12:25 0.455 0.309 0.309 12/29/2019 06:25 2.81 13:25 4.65 3.93 06:20 1.17 13:55 1.84 1.57 06:20 0.133 13:25 0.422 0.298 0.298 0.22 12/30/2019 05:55 2.75 11:10 4.54 3.81 05:30 1.15 11:20 1.81 1.53 05:30 0.128 11:20 0.408 0.278 0.278 12/31/2019 04:45 2.84 11:20 4.53 3.89 05:15 1.17 12:40 1.91 1.55 05:15 0.136 12:40 0.419 0.290 0.290 0.01 Daily Tabular Report
Daily Tabular Report For The Period 11/16/2019 00:00 - 03/09/2020 23:59 MIL_0602, Pipe Height: 18.00 in, Silt: 0.00 in
45 1342
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 01/01/2020 05:40 3.20 12:25 4.65 4.06 06:35 1.30 12:05 1.88 1.62 06:35 0.181 19:10 0.436 0.321 0.321 01/02/2020 04:35 3.49 10:25 4.64 4.23 04:05 1.42 21:00 1.86 1.69 04:05 0.223 10:35 0.431 0.351 0.351 01/03/2020 04:25 3.50 10:10 4.83 4.30 04:55 1.43 10:05 1.89 1.71 04:20 0.223 10:10 0.465 0.363 0.363 01/04/2020 04:10 3.61 11:55 4.94 4.36 04:20 1.45 16:40 2.01 1.72 04:20 0.238 12:15 0.500 0.373 0.373 01/05/2020 04:45 3.52 12:10 5.06 4.38 05:25 1.40 13:50 2.06 1.72 05:25 0.221 13:50 0.525 0.376 0.376 01/06/2020 04:35 3.46 08:55 5.05 4.25 05:15 1.40 08:50 1.94 1.69 05:05 0.216 08:50 0.508 0.353 0.353 01/07/2020 04:50 3.38 08:40 6.31 4.14 04:25 1.36 08:40 2.37 1.68 04:25 0.204 08:40 0.844 0.339 0.339 01/08/2020 04:45 3.16 08:35 4.79 3.81 04:40 1.36 08:35 1.94 1.59 04:40 0.183 08:35 0.471 0.285 0.285 0.02 01/09/2020 05:05 2.58 08:50 4.57 3.44 05:00 1.09 08:35 1.90 1.46 05:00 0.110 08:35 0.425 0.230 0.230 0.18 01/10/2020 04:15 2.51 08:40 4.12 3.33 05:20 1.11 08:40 1.70 1.44 04:55 0.108 08:40 0.334 0.215 0.215 0.02 01/11/2020 05:40 2.76 12:55 4.14 3.54 05:40 1.23 12:55 1.70 1.50 05:40 0.137 12:55 0.337 0.243 0.243 0.01 01/12/2020 06:00 3.09 12:45 4.22 3.73 06:00 1.36 12:45 1.72 1.57 06:00 0.178 12:45 0.350 0.271 0.271 01/13/2020 05:20 2.74 09:00 3.91 3.36 05:20 1.23 09:00 1.63 1.46 05:20 0.135 09:00 0.298 0.218 0.218 0.02 01/14/2020 05:20 2.49 09:05 3.78 3.17 05:20 1.12 09:00 1.67 1.41 05:20 0.107 09:00 0.292 0.195 0.195 0.11 01/15/2020 04:30 2.45 09:05 3.71 3.12 05:10 1.11 08:55 1.60 1.39 03:55 0.104 09:05 0.271 0.188 0.188 0.07 01/16/2020 05:30 2.42 21:40 3.82 3.26 05:25 1.08 21:40 1.64 1.43 05:25 0.099 21:40 0.289 0.208 0.208 0.66 01/17/2020 05:25 2.58 09:20 4.05 3.27 05:15 1.15 09:30 1.72 1.44 05:15 0.116 09:30 0.329 0.209 0.209 01/18/2020 05:25 2.31 11:10 3.83 3.14 05:25 1.02 11:25 1.63 1.38 05:25 0.087 11:45 0.287 0.192 0.192 01/19/2020 05:25 2.28 12:55 3.75 3.11 05:15 0.98 12:30 1.60 1.37 05:15 0.083 12:55 0.274 0.188 0.188 01/20/2020 05:30 2.23 12:00 3.81 3.16 04:30 1.00 13:05 1.65 1.38 05:30 0.081 13:05 0.289 0.195 0.195 01/21/2020 04:40 2.14 09:00 3.72 2.87 04:40 0.95 09:05 1.60 1.28 04:40 0.073 08:55 0.272 0.155 0.155 01/22/2020 04:25 2.11 21:30 3.63 2.93 04:55 0.95 09:10 1.71 1.30 05:20 0.071 09:10 0.278 0.165 0.165 0.03 01/23/2020 04:20 2.57 09:00 3.80 3.28 04:50 1.15 08:55 1.71 1.44 04:50 0.116 08:55 0.301 0.209 0.209 01/24/2020 05:00 2.84 09:05 4.18 3.62 05:15 1.27 09:05 1.76 1.55 05:15 0.148 09:05 0.355 0.259 0.259 01/25/2020 05:05 3.09 11:50 4.39 3.89 05:05 1.37 13:55 1.85 1.63 05:05 0.179 11:50 0.394 0.302 0.302 01/26/2020 05:00 3.27 12:50 4.69 4.12 05:25 1.43 13:00 1.93 1.73 05:25 0.202 12:50 0.457 0.347 0.347 0.16 01/27/2020 05:10 3.40 08:50 4.98 4.26 05:10 1.47 09:20 2.02 1.76 05:10 0.221 09:20 0.509 0.368 0.368 01/28/2020 04:25 3.53 09:10 5.57 4.53 02:45 1.50 09:10 2.09 1.82 04:25 0.239 09:10 0.630 0.418 0.418 0.01 01/29/2020 04:50 3.63 09:05 5.41 4.54 04:10 1.54 09:05 2.18 1.83 04:55 0.255 09:05 0.628 0.422 0.422 01/30/2020 04:35 3.58 08:55 5.55 4.62 04:10 1.52 09:20 2.16 1.85 04:35 0.245 09:00 0.640 0.437 0.437 01/31/2020 05:25 3.53 08:55 5.72 4.67 04:20 1.50 08:55 2.18 1.87 05:30 0.242 08:55 0.682 0.448 0.448 02/01/2020 12:50 2.55 12:05 5.81 4.22 12:50 1.17 11:15 2.22 1.72 12:50 0.115 12:05 0.706 0.359 0.359 02/02/2020 05:00 2.76 12:55 4.30 3.71 05:50 1.15 12:30 1.80 1.55 05:50 0.127 12:30 0.377 0.271 0.271 02/03/2020 04:35 3.18 08:55 4.30 3.82 05:15 1.40 08:45 1.80 1.62 04:35 0.194 08:50 0.375 0.290 0.290 02/04/2020 04:35 3.25 08:50 4.45 3.93 04:35 1.42 08:40 1.85 1.65 04:35 0.199 08:40 0.404 0.309 0.309 02/05/2020 04:40 3.27 09:05 4.53 3.96 05:20 1.40 09:00 1.83 1.64 04:40 0.199 09:00 0.412 0.309 0.309 02/06/2020 04:20 3.24 08:45 4.50 3.96 04:20 1.39 08:40 1.91 1.64 04:20 0.194 08:40 0.426 0.310 0.310 02/07/2020 03:50 3.25 09:00 4.58 3.97 03:55 1.35 09:05 1.83 1.61 03:55 0.189 09:05 0.418 0.304 0.304 02/08/2020 06:10 3.25 13:30 4.48 4.03 06:10 1.44 13:20 1.87 1.69 06:10 0.202 13:20 0.412 0.328 0.328 02/09/2020 06:00 3.13 12:30 4.65 4.07 06:25 1.36 12:35 1.93 1.71 06:25 0.182 12:35 0.452 0.338 0.338 02/10/2020 05:00 3.07 08:15 5.65 4.03 05:00 1.37 08:15 2.24 1.69 05:00 0.177 08:15 0.688 0.328 0.328 02/11/2020 04:10 2.98 08:40 4.80 4.01 04:40 1.27 08:55 1.99 1.69 04:40 0.157 08:55 0.482 0.329 0.329 02/12/2020 04:50 3.17 08:40 4.84 4.07 05:20 1.39 08:50 1.96 1.70 04:55 0.188 08:50 0.483 0.335 0.335 02/13/2020 04:30 3.12 08:40 4.81 3.95 04:25 1.32 09:00 1.95 1.67 04:35 0.176 09:00 0.472 0.315 0.315 02/14/2020 04:40 3.00 08:55 4.67 3.80 03:55 1.27 09:25 1.89 1.62 04:40 0.159 08:55 0.442 0.289 0.289 02/15/2020 05:50 2.83 11:30 4.28 3.54 04:50 1.29 11:20 1.80 1.56 05:40 0.150 11:20 0.373 0.251 0.251 02/16/2020 04:55 2.73 11:35 3.61 3.19 04:55 1.24 11:00 1.59 1.44 04:55 0.135 12:20 0.259 0.198 0.198 02/17/2020 04:55 2.42 10:05 3.66 3.10 05:00 1.05 10:00 1.62 1.40 05:00 0.096 10:00 0.268 0.188 0.188 02/18/2020 04:30 2.45 09:00 3.64 3.11 04:25 1.10 09:50 1.62 1.41 04:25 0.103 08:55 0.267 0.190 0.190 02/19/2020 04:55 2.54 09:10 3.69 3.18 05:40 1.17 09:35 1.62 1.44 05:05 0.116 09:10 0.273 0.199 0.199 02/20/2020 05:10 2.62 10:10 3.89 3.31 03:50 1.19 10:10 1.69 1.49 03:50 0.124 10:10 0.308 0.218 0.218 02/21/2020 04:40 2.67 09:40 4.02 3.32 05:05 1.22 09:35 1.75 1.49 04:55 0.130 09:35 0.332 0.220 0.220 02/22/2020 05:30 2.62 11:30 3.89 3.37 04:45 1.18 11:30 1.70 1.50 04:45 0.123 11:30 0.308 0.227 0.227 02/23/2020 05:40 2.60 12:40 4.05 3.45 06:05 1.20 12:35 1.72 1.53 06:05 0.123 12:35 0.330 0.240 0.240 02/24/2020 05:00 2.68 08:45 4.05 3.40 05:05 1.24 08:35 1.73 1.52 04:55 0.132 08:35 0.331 0.232 0.232 46 1343
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 02/25/2020 04:55 2.69 08:50 4.14 3.41 05:20 1.20 08:50 1.79 1.52 05:20 0.129 08:50 0.356 0.233 0.233 02/26/2020 04:50 2.56 08:30 3.94 3.22 04:30 1.18 08:40 1.69 1.45 04:50 0.118 08:40 0.312 0.205 0.205 02/27/2020 04:55 2.38 08:30 3.75 3.15 04:55 1.10 08:40 1.66 1.42 04:55 0.098 08:40 0.287 0.195 0.195 02/28/2020 04:55 2.43 08:55 3.71 3.09 04:25 1.09 08:55 1.63 1.38 04:55 0.101 08:55 0.277 0.184 0.184 02/29/2020 05:35 2.41 11:10 3.72 3.17 05:35 1.06 13:15 1.64 1.41 05:35 0.097 11:10 0.278 0.196 0.196 03/01/2020 05:45 2.27 11:15 3.47 2.79 05:40 1.00 11:10 1.55 1.27 05:40 0.084 11:15 0.238 0.145 0.145 03/02/2020 05:05 1.78 08:40 2.97 2.36 04:45 0.77 08:40 1.39 1.07 04:50 0.045 08:40 0.171 0.098 0.098 03/03/2020 04:30 1.69 08:55 2.80 2.00 04:50 0.70 08:55 1.32 0.88 04:30 0.039 08:55 0.149 0.063 0.063 03/04/2020 05:30 1.46 08:50 2.30 1.87 03:35 0.56 09:10 1.07 0.81 05:30 0.025 08:55 0.091 0.053 0.053 03/05/2020 05:30 1.38 21:00 2.29 1.83 04:35 0.52 09:10 1.06 0.81 05:15 0.022 21:00 0.087 0.051 0.051 03/06/2020 04:45 1.31 09:00 2.19 1.82 04:00 0.49 08:10 1.09 0.81 04:45 0.019 08:20 0.084 0.051 0.051 03/07/2020 05:50 1.21 13:40 1.92 1.67 05:00 0.45 13:45 0.88 0.69 05:50 0.015 13:45 0.058 0.038 0.038 03/08/2020 06:00 1.37 10:30 1.89 1.51 05:20 0.42 08:50 0.83 0.58 05:20 0.017 10:30 0.050 0.027 0.027 03/09/2020 06:35 1.23 21:50 5.37 1.75 04:30 0.39 21:50 2.13 0.70 05:55 0.014 21:50 0.608 0.060 0.060 Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Rain
(in)
Avg
Total

3.67 1.53

31.478

0.274

4.90 Report Summary For The Period 11/16/2019 00:00 - 03/09/2020 23:59 47 1344
Item # 16.

Site Commentary
Site Information
MIL_0649
Pipe Dimensions 21.5
Silt Level 0.00"
Overview
Site MIL_0649 functioned under normal conditions during the period Saturday, November 16, 2019 to Monday, March 9, 2020 . This site exhibited an observable response to the wet weather events of November 26, 2019 - November 27, 2019, December 7, 2019 - December 8, 2019, and January 16, 2020 - January 17, 2020. Review of the scattergraph shows that free flow conditions were recorded during the study period.

Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted to date and support the relative accuracy of the flow monitor at this location.

This location was installed upstream of site MIL_1790 and downstream of the combined flows of sites MIL_0386 and MIL_2840. A review of balancing with the combined flows of MIL_0386 and MIL_2840 into MIL_0649 and MIL_2491 shows a net flow between the sites of 0.426 MGD.

Observations
Average flow depth, velocity, and quantity data observed during Saturday, November 16, 2019 to Monday, March 9, 2020 , along with observed minimum and maximum data, are provided in the following table.

Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 8.66 1.24 0.777
Minimum 6.64 0.82 0.386
Maximum 11.63 1.64 1.448
Time of Minimum 3/1/2020 3:15 AM 2/1/2020 11:40 PM 2/17/2020 1:55 AM Time of Maximum 2/18/2020 11:55 AM 12/5/2019 2:35 PM 1/9/2020 10:45 AM Data Quality
Data uptime observed during the Saturday, November 16, 2019 to the Monday, March 9, 2020 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.

Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
48 1345
Item # 16.

Latitude: 37.430840°
Longitude: -121.905657
Site Sketch Profile View or Photo
Sensor Shot
22431
Additional Site Info. / Comments:

ADS Project Name:

ADS Project Number:

Milpitas.WWTFM.CA19-20
Wireless
Pipe Material
Antenna Location
Communication Information:

Manhole Pick / Vent Hole
No
PVC
Unbolted Normal
Good
Active Drop Connections Air Quality:

Communication Type
Normal
26'' 54''
Manhole Cover Manhole Frame
Pipe Condition:

Manhole Material:

Manhole Diameter (Approx.):

Manhole Depth (Approx. FT): Manhole Configuration
Concrete Good
10'
Manhole Condition:

Upstream 0-5 FT Manhole
Sensors / Devices:

Installation Confirmation:

Manhole Opening Diameter (in)
Silt Type
Hydraulic Comments:
0''
Single

0.25"
Manhole / Pipe Information:

Pressure Sensor Range (psi)
Confirmation Time:

0.00"
Peak Combo (CS4)
Pipe Size (HxW)
0''
Downlooker Physical Offset (in) Measurement Confidence (in) NA
Peak Velocity (fps)
Silt (in)
10:22:26 AM 21.50" x 21.50"
Smooth deep flow with moderate velocity
0 - 5 psi
Depth of Flow (Wet DOF) (in) Range (Air DOF) (in)

10.50 Velocity Sensor Offset (in)

1.61 Installation Information
Circular
Monitor Series
Monitor Location:

Doppler Standard Ring and Crank
Manhole #
Installation Date:

Pipe Size (H x W)
Topside / Area Photo
Tuesday, November 12, 2019
Access
Temporary

21.50" x 21.50"
Traffic
649 Residential/Commercial
Map
Installation Type:

Monitoring Location (Sensors):

MIL_0649
TRITON+
System Characteristics
Location Type
Pipe Shape Drive
Milpitas Temp Study 2019-20
Drive Light
Site Access Details:

Site Address /Location:

Site Name
79 Railroad Avenue
Flow Monitoring
Site Report
East Inlet
(Sensors location)
East Outlet
49 1346
Item # 16.
50 1347
Item # 16.
51 1348
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 11/16/2019 04:20 7.62 12:25 10.26 8.49 04:45 0.93 12:30 1.34 1.07 04:00 0.480 12:30 1.024 0.648 0.648 11/17/2019 23:55 7.22 15:05 8.57 7.75 06:20 0.85 15:05 1.24 0.99 06:20 0.423 15:05 0.748 0.527 0.527 11/18/2019 00:55 7.00 10:15 11.13 9.05 03:35 1.00 10:15 1.54 1.27 00:55 0.462 10:15 1.311 0.848 0.848 11/19/2019 04:50 7.37 15:50 10.61 9.09 05:15 1.01 15:50 1.55 1.30 05:15 0.504 15:50 1.244 0.865 0.865 11/20/2019 03:30 7.27 12:30 10.87 8.85 03:30 1.06 12:30 1.54 1.28 03:30 0.514 12:30 1.273 0.823 0.823 11/21/2019 04:20 7.18 11:05 10.80 9.00 04:25 1.03 11:00 1.53 1.30 04:20 0.489 11:00 1.251 0.854 0.854 11/22/2019 04:40 7.12 11:40 11.16 9.10 04:40 0.99 11:35 1.63 1.32 04:40 0.464 11:35 1.382 0.879 0.879 11/23/2019 05:05 7.01 12:10 9.90 8.01 04:55 1.00 12:45 1.41 1.13 05:00 0.459 12:10 1.014 0.633 0.633 11/24/2019 03:25 6.97 13:00 9.71 7.79 03:20 0.93 12:05 1.39 1.09 03:25 0.425 13:00 0.984 0.587 0.587 11/25/2019 03:50 6.96 12:35 10.77 8.89 02:10 0.97 12:30 1.45 1.24 02:10 0.443 12:30 1.184 0.803 0.803 11/26/2019 04:20 7.31 09:40 10.62 9.16 04:10 1.05 10:10 1.52 1.32 04:20 0.518 10:10 1.212 0.883 0.883 0.36 11/27/2019 03:20 7.70 10:05 10.48 9.23 03:15 1.09 13:05 1.54 1.34 03:15 0.569 13:10 1.198 0.906 0.906 0.63 11/28/2019 20:20 7.16 00:00 8.75 7.60 23:50 0.90 00:00 1.26 1.07 23:50 0.433 00:00 0.787 0.555 0.555 11/29/2019 04:20 7.00 14:10 9.99 7.88 22:45 0.92 13:55 1.42 1.10 04:15 0.435 09:15 1.034 0.603 0.603 0.02 11/30/2019 06:30 6.97 17:45 8.05 7.47 06:25 0.93 17:35 1.13 1.02 06:25 0.427 17:45 0.627 0.513 0.513 0.10 12/01/2019 06:05 7.08 21:35 8.27 7.55 06:05 0.91 21:40 1.20 1.05 06:05 0.427 21:40 0.695 0.537 0.537 0.06 12/02/2019 04:15 7.16 13:35 10.70 9.14 04:10 1.02 10:40 1.63 1.34 04:10 0.483 10:40 1.255 0.905 0.905 0.30 12/03/2019 04:20 7.30 10:05 10.72 8.96 04:10 1.10 10:10 1.56 1.34 04:10 0.536 10:10 1.261 0.870 0.870 0.01 12/04/2019 02:45 7.45 12:15 11.41 9.35 02:20 1.11 12:10 1.64 1.39 02:45 0.557 12:10 1.436 0.957 0.957 0.39 12/05/2019 03:30 7.61 14:40 11.30 9.20 03:35 1.10 14:35 1.64 1.35 03:35 0.569 14:35 1.418 0.908 0.908 0.01 12/06/2019 02:15 7.60 12:40 10.59 9.00 01:40 1.02 17:50 1.48 1.29 01:40 0.536 12:55 1.173 0.843 0.843 0.01 12/07/2019 06:00 7.33 11:50 9.77 8.30 06:05 1.05 11:45 1.49 1.21 06:05 0.516 11:50 1.068 0.710 0.710 0.67 12/08/2019 04:15 7.64 07:45 9.62 8.11 05:40 1.08 07:45 1.43 1.17 04:15 0.562 07:45 1.008 0.659 0.659 0.20 12/09/2019 04:40 7.53 16:50 10.46 9.15 04:35 1.08 13:35 1.53 1.32 04:35 0.549 13:35 1.179 0.887 0.887 12/10/2019 05:10 7.57 12:00 10.57 9.13 04:00 1.08 10:35 1.49 1.31 05:00 0.557 11:55 1.179 0.872 0.872 12/11/2019 04:20 7.58 13:20 10.40 9.07 04:05 1.08 12:35 1.51 1.31 04:00 0.554 13:20 1.173 0.867 0.867 0.03 12/12/2019 04:30 7.49 12:45 10.46 9.06 04:20 1.07 13:25 1.50 1.31 04:20 0.539 12:40 1.173 0.865 0.865 0.01 12/13/2019 01:50 7.61 12:20 10.35 8.74 01:55 1.09 12:20 1.52 1.27 01:55 0.564 12:20 1.180 0.796 0.796 0.01 12/14/2019 04:10 7.39 13:25 10.37 8.35 03:45 1.01 13:50 1.48 1.19 03:45 0.506 13:25 1.129 0.707 0.707 0.01 12/15/2019 03:10 7.25 06:55 8.09 7.78 09:10 1.00 06:50 1.17 1.10 06:20 0.487 06:50 0.655 0.584 0.584 0.01 12/16/2019 03:45 7.35 08:25 10.48 9.18 03:40 1.00 12:55 1.49 1.29 03:45 0.493 12:50 1.171 0.875 0.875 0.01 12/17/2019 05:15 7.52 16:55 10.65 9.38 03:55 1.04 16:50 1.56 1.34 05:15 0.528 16:50 1.256 0.934 0.934 0.01 12/18/2019 04:20 7.59 12:50 10.77 9.53 04:20 1.07 12:45 1.51 1.36 04:20 0.549 12:45 1.232 0.953 0.953 0.01 12/19/2019 04:35 7.56 13:25 11.00 9.49 04:35 1.02 13:05 1.56 1.34 04:35 0.522 13:05 1.299 0.945 0.945 12/20/2019 05:05 7.32 14:20 10.74 9.30 05:00 1.00 14:20 1.53 1.32 05:00 0.489 14:20 1.247 0.902 0.902 12/21/2019 04:25 7.24 11:25 10.10 8.35 05:40 0.97 11:20 1.46 1.16 04:30 0.472 11:20 1.095 0.688 0.688 0.01 12/22/2019 03:25 7.15 14:35 8.70 7.74 03:25 0.97 14:35 1.29 1.10 03:25 0.457 14:35 0.795 0.584 0.584 0.41 12/23/2019 04:40 7.12 11:35 10.73 9.01 04:05 1.04 11:35 1.53 1.31 04:45 0.491 11:35 1.244 0.867 0.867 12/24/2019 03:10 7.11 00:10 8.79 7.55 18:30 0.96 00:10 1.31 1.07 23:40 0.478 00:10 0.821 0.548 0.548 0.02 12/25/2019 06:00 6.95 16:10 8.45 7.42 01:20 0.93 16:10 1.19 1.02 05:45 0.426 16:10 0.706 0.509 0.509 0.08 12/26/2019 03:10 7.13 13:20 10.47 8.91 01:20 0.90 13:30 1.60 1.28 01:55 0.445 13:30 1.254 0.842 0.842 12/27/2019 02:50 7.15 11:00 10.96 9.02 02:50 1.04 10:50 1.56 1.32 02:50 0.491 11:00 1.290 0.873 0.873 12/28/2019 06:15 7.08 13:50 10.07 8.28 06:10 0.99 14:15 1.47 1.20 06:10 0.466 14:15 1.097 0.708 0.708 12/29/2019 07:30 7.01 09:20 9.47 7.84 01:55 0.94 10:10 1.37 1.12 01:55 0.451 09:20 0.945 0.609 0.609 0.22 12/30/2019 03:35 7.11 18:55 10.29 8.95 02:50 1.00 18:40 1.58 1.28 03:00 0.473 18:40 1.199 0.839 0.839 12/31/2019 05:10 6.91 08:50 9.14 7.96 05:10 0.97 08:50 1.34 1.14 05:10 0.441 08:50 0.885 0.631 0.631 0.01 Daily Tabular Report
Daily Tabular Report For The Period 11/16/2019 00:00 - 03/09/2020 23:59 MIL_0649, Pipe Height: 21.50 in, Silt: 0.00 in
52 1349
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 01/01/2020 06:35 6.75 14:05 7.61 7.22 06:10 0.89 02:20 1.10 1.02 06:10 0.393 13:55 0.564 0.489 0.489 01/02/2020 03:35 6.84 07:40 10.59 8.94 04:15 0.87 07:35 1.58 1.26 04:15 0.396 07:35 1.263 0.828 0.828 01/03/2020 03:05 7.23 15:20 10.97 8.90 22:35 0.94 15:15 1.57 1.28 05:05 0.482 15:15 1.297 0.835 0.835 01/04/2020 03:30 7.42 11:35 10.41 8.44 03:30 1.01 11:10 1.58 1.21 03:30 0.503 11:10 1.209 0.729 0.729 01/05/2020 03:35 7.06 07:20 8.31 7.67 03:35 0.98 07:15 1.27 1.12 03:35 0.457 07:15 0.736 0.585 0.585 01/06/2020 04:35 7.15 13:10 11.00 9.07 01:25 1.03 12:20 1.59 1.31 04:35 0.493 15:35 1.322 0.876 0.876 01/07/2020 04:00 7.48 12:40 11.07 9.28 03:50 1.03 12:35 1.60 1.32 03:55 0.522 12:35 1.349 0.907 0.907 01/08/2020 04:30 7.94 12:35 11.43 9.75 00:55 1.10 12:35 1.60 1.38 04:30 0.617 12:35 1.405 1.002 1.002 0.02 01/09/2020 03:50 7.55 10:45 11.57 9.35 03:45 1.04 10:50 1.62 1.33 03:45 0.531 10:45 1.448 0.919 0.919 0.18 01/10/2020 05:15 7.50 12:35 10.49 9.02 05:40 1.00 12:30 1.49 1.27 05:40 0.507 12:30 1.177 0.839 0.839 0.02 01/11/2020 06:15 7.15 13:55 9.43 8.01 03:25 0.92 13:55 1.35 1.12 03:25 0.438 13:55 0.925 0.625 0.625 0.01 01/12/2020 04:00 7.19 14:20 8.26 7.67 03:00 0.86 15:30 1.16 1.04 03:00 0.416 15:30 0.668 0.546 0.546 01/13/2020 04:40 7.37 13:15 10.57 8.93 01:20 0.98 13:15 1.52 1.25 04:35 0.487 13:15 1.212 0.816 0.816 0.02 01/14/2020 04:55 7.37 13:10 10.29 8.99 04:55 1.01 15:05 1.50 1.28 04:55 0.499 15:15 1.148 0.839 0.839 0.11 01/15/2020 04:40 7.36 12:15 10.21 9.12 04:35 1.02 12:10 1.45 1.30 04:35 0.502 12:05 1.107 0.865 0.865 0.07 01/16/2020 04:30 7.39 14:05 10.85 9.26 04:10 1.01 14:05 1.57 1.33 04:10 0.505 14:05 1.293 0.904 0.904 0.66 01/17/2020 04:55 7.83 15:35 10.79 9.11 04:50 1.06 15:05 1.58 1.31 04:50 0.570 15:30 1.292 0.874 0.874 01/18/2020 06:25 7.42 12:35 9.73 8.13 04:05 0.98 11:50 1.42 1.14 04:05 0.487 11:50 0.989 0.653 0.653 01/19/2020 05:00 7.11 09:00 8.23 7.62 00:20 0.95 09:00 1.20 1.05 05:10 0.448 09:00 0.690 0.543 0.543 01/20/2020 05:00 7.38 14:50 10.46 8.94 05:00 0.98 15:20 1.47 1.24 05:00 0.484 15:20 1.148 0.814 0.814 01/21/2020 04:10 7.42 12:45 10.15 9.18 04:10 1.01 09:40 1.45 1.29 04:10 0.503 12:45 1.099 0.866 0.866 01/22/2020 04:15 7.49 12:50 10.51 9.24 04:15 1.06 12:45 1.56 1.33 04:15 0.536 12:45 1.232 0.903 0.903 0.03 01/23/2020 04:20 7.68 09:05 10.54 9.36 03:50 1.10 15:30 1.49 1.32 04:20 0.578 09:05 1.179 0.910 0.910 01/24/2020 04:55 7.63 12:40 10.83 9.25 04:50 1.03 11:00 1.56 1.30 04:50 0.534 11:15 1.267 0.887 0.887 01/25/2020 03:30 7.34 15:05 9.45 8.02 20:55 0.93 15:00 1.33 1.10 20:55 0.482 15:05 0.912 0.611 0.611 01/26/2020 05:20 7.02 21:40 8.97 7.69 08:45 0.92 21:35 1.26 1.03 05:20 0.431 21:40 0.807 0.543 0.543 0.16 01/27/2020 00:55 7.55 15:45 10.43 9.27 00:25 0.95 15:35 1.43 1.25 00:25 0.492 15:40 1.120 0.852 0.852 01/28/2020 05:05 7.64 10:00 11.35 9.43 05:05 1.00 10:35 1.52 1.28 05:05 0.520 10:05 1.324 0.897 0.897 0.01 01/29/2020 04:35 7.60 09:45 10.80 9.18 04:35 1.01 09:40 1.53 1.26 04:35 0.520 09:40 1.250 0.848 0.848 01/30/2020 02:15 7.68 11:20 10.28 9.06 02:10 1.01 11:15 1.53 1.28 02:10 0.529 11:15 1.176 0.849 0.849 01/31/2020 05:10 7.40 12:30 10.35 9.01 03:55 1.01 14:20 1.51 1.30 03:55 0.512 12:35 1.150 0.856 0.856 02/01/2020 03:45 7.26 14:45 9.12 7.86 23:40 0.82 08:45 1.35 1.13 23:40 0.399 14:45 0.878 0.614 0.614 02/02/2020 02:45 6.88 15:30 8.12 7.40 21:05 0.92 12:25 1.18 1.03 06:15 0.425 12:25 0.663 0.514 0.514 02/03/2020 02:35 7.10 10:35 10.44 8.94 00:55 0.97 10:30 1.51 1.26 02:40 0.462 10:30 1.182 0.822 0.822 02/04/2020 04:10 7.26 13:20 10.51 8.97 03:55 1.02 13:00 1.53 1.28 04:20 0.498 13:00 1.203 0.840 0.840 02/05/2020 04:20 7.46 10:00 10.20 9.12 04:30 1.03 09:35 1.48 1.30 04:30 0.521 09:35 1.121 0.863 0.863 02/06/2020 04:50 7.38 13:50 10.35 9.07 04:50 0.99 13:45 1.55 1.30 04:50 0.492 13:45 1.202 0.863 0.863 02/07/2020 02:25 7.30 11:00 10.23 8.93 02:20 1.05 10:55 1.55 1.30 02:20 0.512 10:55 1.181 0.842 0.842 02/08/2020 04:05 6.92 11:30 8.67 7.59 22:20 0.95 11:35 1.28 1.10 04:05 0.452 11:35 0.789 0.569 0.569 02/09/2020 04:35 6.70 13:35 7.72 7.29 05:20 0.91 11:55 1.16 1.05 05:05 0.398 11:55 0.606 0.513 0.513 02/10/2020 04:30 7.08 08:10 10.11 8.52 00:45 0.92 08:10 1.46 1.21 00:50 0.462 08:10 1.095 0.739 0.739 02/11/2020 04:30 7.26 13:00 10.71 9.08 04:10 1.05 13:05 1.54 1.31 04:30 0.519 13:05 1.248 0.868 0.868 02/12/2020 04:30 7.23 12:05 10.47 9.29 04:25 1.06 09:55 1.53 1.34 04:25 0.510 12:05 1.199 0.914 0.914 02/13/2020 02:15 7.42 10:40 10.69 9.06 02:15 1.07 10:30 1.55 1.31 02:15 0.535 10:35 1.254 0.869 0.869 02/14/2020 04:35 7.35 13:10 10.56 9.17 05:05 1.08 10:35 1.47 1.31 05:05 0.536 13:10 1.165 0.879 0.879 02/15/2020 03:25 6.97 11:50 10.38 8.15 02:10 0.90 11:45 1.44 1.16 02:10 0.432 11:45 1.117 0.669 0.669 02/16/2020 02:15 6.86 12:30 10.02 7.96 04:30 0.88 12:35 1.41 1.10 02:55 0.417 12:35 1.046 0.614 0.614 02/17/2020 04:45 6.98 12:30 11.07 8.66 01:55 0.84 12:25 1.50 1.20 01:55 0.386 12:25 1.265 0.756 0.756 02/18/2020 04:00 7.08 11:55 11.63 9.17 03:35 0.97 11:55 1.56 1.28 03:35 0.465 11:55 1.399 0.861 0.861 02/19/2020 04:35 7.26 11:20 10.90 9.04 02:05 1.04 13:45 1.53 1.29 02:05 0.503 11:25 1.236 0.857 0.857 02/20/2020 04:30 7.37 12:45 10.65 9.14 03:00 1.09 16:20 1.52 1.33 04:25 0.546 12:30 1.208 0.886 0.886 02/21/2020 03:25 7.27 10:10 10.24 8.74 03:10 1.05 14:50 1.52 1.29 03:10 0.508 10:10 1.156 0.813 0.813 02/22/2020 04:45 6.91 13:15 9.92 8.12 06:40 0.90 10:55 1.47 1.20 06:40 0.407 13:15 1.064 0.686 0.686 02/23/2020 06:05 6.85 20:15 9.05 7.96 05:50 0.94 19:55 1.36 1.16 05:50 0.426 19:55 0.872 0.643 0.643 02/24/2020 04:30 6.86 10:45 11.18 8.92 04:20 0.93 11:05 1.60 1.33 04:20 0.419 11:05 1.364 0.867 0.867 53 1350
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 02/25/2020 04:55 6.92 14:00 10.51 8.85 04:35 1.04 12:30 1.56 1.32 04:55 0.472 13:55 1.234 0.849 0.849 02/26/2020 04:35 6.97 10:25 10.67 8.86 04:30 1.03 13:30 1.56 1.34 04:30 0.472 10:20 1.228 0.856 0.856 02/27/2020 04:45 7.05 12:40 10.71 9.02 04:40 1.07 12:45 1.57 1.36 04:40 0.498 12:45 1.274 0.896 0.896 02/28/2020 02:20 7.09 10:35 10.78 8.92 00:30 1.07 11:40 1.58 1.33 02:20 0.509 10:30 1.286 0.868 0.868 02/29/2020 03:05 6.92 11:00 10.62 7.97 02:50 0.98 11:00 1.51 1.15 03:00 0.444 11:00 1.208 0.642 0.642 03/01/2020 03:15 6.64 18:20 8.11 7.30 03:05 0.93 18:25 1.24 1.07 03:05 0.400 18:25 0.696 0.524 0.524 03/02/2020 03:20 6.85 10:35 10.66 8.91 03:10 1.01 10:40 1.55 1.28 03:15 0.453 10:40 1.249 0.836 0.836 03/03/2020 05:20 7.40 10:05 11.11 9.27 03:20 1.07 10:10 1.61 1.33 05:15 0.539 10:10 1.364 0.909 0.909 03/04/2020 03:30 7.22 09:10 11.00 9.17 03:10 1.05 12:20 1.54 1.33 03:10 0.506 09:05 1.285 0.899 0.899 03/05/2020 04:40 7.10 13:30 10.54 9.04 04:30 1.04 13:25 1.57 1.32 04:35 0.490 13:30 1.242 0.868 0.868 03/06/2020 02:10 6.88 15:40 10.99 8.95 02:10 1.03 14:15 1.55 1.32 02:10 0.462 15:35 1.273 0.863 0.863 03/07/2020 02:25 6.80 11:35 10.26 8.12 02:45 0.91 17:45 1.49 1.23 02:45 0.404 11:35 1.111 0.706 0.706 03/08/2020 02:15 6.84 10:40 9.79 7.88 02:20 1.06 10:40 1.42 1.20 02:15 0.472 10:40 1.029 0.655 0.655 03/09/2020 03:25 7.04 12:00 11.45 9.16 01:50 1.06 13:30 1.59 1.32 03:25 0.495 13:30 1.388 0.895 0.895 Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Rain
(in)
Avg
Total

8.66 1.24

89.337

0.777

4.90 Report Summary For The Period 11/16/2019 00:00 - 03/09/2020 23:59 54 1351
Item # 16.

Site Commentary
Site Information
MIL_0715
Pipe Dimensions 30.5
Silt Level 0.00"
Overview
Site MIL_0715 functioned under normal conditions during the period Saturday, November 16, 2019 to Monday, March 9, 2020 . This site exhibited an observable response to the wet weather events of November 26, 2019 - November 27, 2019, December 7, 2019 - December 8, 2019, and January 16, 2020 - January 17, 2020. Review of the scattergraph shows that free flow conditions were recorded during the study period.

Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted to date and support the relative accuracy of the flow monitor at this location. Due to meter malfunction, data confidence is less than typical during January 27, 2020 through February 04, 2020. Also a data gap occured beginning January 05, 2020 through January 09, 2020.

This location was installed upstream of site MIL_2808. (See MIL_2808 Site Commentary for More Details) Observations
Average flow depth, velocity, and quantity data observed during Saturday, November 16, 2019 to Monday, March 9, 2020 , along with observed minimum and maximum data, are provided in the following table.

Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 7.53 1.46 0.969
Minimum 4.42 0.41 0.120
Maximum 10.33 2.18 2.069
Time of Minimum 1/30/2020 5:55 AM 1/30/2020 5:40 AM 1/30/2020 5:40 AM Time of Maximum 3/8/2020 1:30 PM 3/3/2020 9:20 AM 3/8/2020 1:45 PM Data Quality
Data uptime observed during the Saturday, November 16, 2019 to the Monday, March 9, 2020 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.

Percent Uptime
Depth (in) 96
Velocity (ft/s) 96
Quantity (MGD) 96
55 1352
Item # 16.

Latitude: 37.421203°
Longitude: -121.917399
Site Sketch Profile View or Photo
Sensor Shot
22431
Additional Site Info. / Comments:

ADS Project Name:

ADS Project Number:

Milpitas.WWTFM.CA19-20
Wireless
Pipe Material
Antenna Location
Communication Information:

Manhole Pick / Vent Hole
No
Concrete
Unbolted Normal
Good
Active Drop Connections Air Quality:

Communication Type
Normal
26'' 54''
Manhole Cover Manhole Frame
Pipe Condition:

Manhole Material:

Manhole Diameter (Approx.):

Manhole Depth (Approx. FT): Manhole Configuration
Concrete Good
5'
Manhole Condition:

Upstream 0-5 FT Manhole
Sensors / Devices:

Installation Confirmation:

Manhole Opening Diameter (in)
Silt Type
Hydraulic Comments:
0''
Single

0.25"
Manhole / Pipe Information:

Pressure Sensor Range (psi)
Confirmation Time:

0.00"
Peak Combo (CS4)
Pipe Size (HxW)
0''
Downlooker Physical Offset (in) Measurement Confidence (in) NA
Peak Velocity (fps)
Silt (in)
5:47:56 AM 30.5" x 30.0"
Smooth flow with medium depth and moderate velocity
0 - 5 psi
Depth of Flow (Wet DOF) (in) Range (Air DOF) (in)

5.63 Velocity Sensor Offset (in)

1.03 Installation Information
Circular
Monitor Series
Monitor Location:

Doppler Standard Ring and Crank
Manhole #
Installation Date:

Pipe Size (H x W)
Topside / Area Photo
Tuesday, November 12, 2019
Access
Temporary

30.5" x 30.0"
Traffic
715 Residential/Commercial
Map
Installation Type:

Monitoring Location (Sensors):

MIL_0715
TRITON+
System Characteristics
Location Type
Pipe Shape In Parking Lot
Milpitas Temp Study 2019-20
Drive Light
Site Access Details:

Site Address /Location:

Site Name
Barber Ln and Bellew Dr
Flow Monitoring
Site Report
SE Inlet
(Sensors location)
NW Outlet
56 1353
Item # 16.
57 1354
Item # 16.
58 1355
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 11/16/2019 06:25 4.95 11:55 9.20 7.43 05:00 0.66 13:45 1.88 1.39 05:00 0.225 13:45 1.517 0.912 0.912 11/17/2019 06:10 4.81 12:15 9.36 7.49 04:55 0.58 11:45 1.87 1.40 04:55 0.196 12:40 1.544 0.939 0.939 11/18/2019 05:25 4.68 09:20 8.94 7.09 03:45 0.61 09:05 1.84 1.31 05:25 0.204 09:10 1.436 0.802 0.802 11/19/2019 05:55 4.84 09:30 8.99 7.09 05:10 0.56 08:40 1.87 1.32 05:10 0.185 09:35 1.465 0.803 0.803 11/20/2019 05:15 4.68 09:20 8.90 6.97 04:00 0.65 09:00 1.92 1.31 05:15 0.204 09:00 1.464 0.777 0.777 11/21/2019 05:25 4.52 09:15 8.71 6.93 03:50 0.56 09:15 1.80 1.29 05:25 0.178 09:15 1.368 0.764 0.764 11/22/2019 05:20 4.76 09:35 8.75 6.99 06:40 0.61 09:05 1.81 1.32 04:25 0.206 09:05 1.353 0.781 0.781 11/23/2019 06:05 4.77 13:05 9.03 7.27 06:10 0.51 12:00 1.84 1.37 06:10 0.165 12:05 1.445 0.871 0.871 11/24/2019 05:50 4.75 13:20 9.10 7.35 05:25 0.57 11:00 1.93 1.39 05:25 0.188 11:55 1.492 0.907 0.907 11/25/2019 05:15 4.71 09:55 8.66 6.99 04:40 0.54 09:40 1.87 1.31 04:40 0.174 09:40 1.400 0.782 0.782 11/26/2019 05:25 4.71 21:35 9.03 7.16 04:35 0.58 21:35 1.94 1.36 04:35 0.189 21:35 1.553 0.845 0.845 0.36 11/27/2019 05:35 5.44 10:30 9.06 7.54 06:10 0.76 09:30 1.89 1.45 06:10 0.301 10:35 1.493 0.942 0.942 0.63 11/28/2019 05:35 5.48 13:20 9.29 7.36 06:45 0.76 13:10 1.86 1.40 06:45 0.304 13:10 1.546 0.882 0.882 11/29/2019 06:20 5.39 12:55 9.04 7.47 06:10 0.80 14:10 1.90 1.43 06:10 0.309 14:10 1.487 0.916 0.916 0.02 11/30/2019 06:40 5.38 13:25 9.28 7.49 06:10 0.72 13:45 1.86 1.41 06:10 0.278 13:45 1.535 0.918 0.918 0.10 12/01/2019 06:05 5.30 13:40 9.13 7.59 06:25 0.69 14:35 1.85 1.42 06:25 0.260 14:35 1.504 0.946 0.946 0.06 12/02/2019 05:50 5.43 09:50 9.15 7.45 04:10 0.81 09:45 1.89 1.43 05:55 0.316 09:50 1.538 0.914 0.914 0.30 12/03/2019 05:40 5.38 09:35 8.83 7.41 05:55 0.72 09:50 1.84 1.44 05:55 0.276 09:50 1.422 0.909 0.909 0.01 12/04/2019 04:05 5.72 09:30 9.05 7.58 04:20 0.84 09:50 1.98 1.50 04:20 0.351 09:50 1.582 0.972 0.972 0.39 12/05/2019 05:15 5.46 09:35 9.13 7.59 05:15 0.81 09:10 1.90 1.48 05:15 0.317 09:40 1.541 0.974 0.974 0.01 12/06/2019 05:20 5.48 09:35 9.24 7.69 04:50 0.76 09:40 1.94 1.50 04:50 0.305 09:40 1.596 0.997 0.997 0.01 12/07/2019 06:20 5.65 19:20 10.08 8.16 06:00 0.81 18:50 2.02 1.57 06:00 0.336 19:15 1.862 1.156 1.156 0.67 12/08/2019 06:20 5.97 13:30 9.78 8.36 07:00 0.94 11:20 1.98 1.61 07:00 0.421 11:20 1.737 1.209 1.209 0.20 12/09/2019 05:40 6.05 09:35 9.47 7.99 05:20 0.95 09:40 1.93 1.58 05:20 0.436 09:40 1.642 1.093 1.093 12/10/2019 05:05 5.65 09:40 9.52 7.86 05:05 0.81 09:15 2.02 1.57 05:05 0.333 09:15 1.711 1.079 1.079 12/11/2019 05:30 5.79 09:30 9.50 7.89 04:45 0.88 11:20 1.98 1.59 04:45 0.383 09:20 1.675 1.091 1.091 0.03 12/12/2019 05:15 5.89 09:25 9.54 7.94 04:55 0.89 09:10 2.01 1.59 04:55 0.395 10:00 1.723 1.096 1.096 0.01 12/13/2019 05:10 5.86 09:30 9.52 7.91 05:15 0.86 10:10 1.95 1.54 05:15 0.375 10:10 1.667 1.061 1.061 0.01 12/14/2019 05:55 5.74 13:40 9.92 8.18 05:15 0.85 12:35 2.02 1.59 05:15 0.367 12:35 1.810 1.164 1.164 0.01 12/15/2019 06:15 5.82 12:05 10.12 8.29 05:30 0.93 12:35 2.00 1.62 06:50 0.406 12:15 1.842 1.209 1.209 0.01 12/16/2019 05:25 5.74 09:25 9.43 7.88 06:15 0.87 08:55 2.01 1.56 05:45 0.373 09:20 1.665 1.069 1.069 0.01 12/17/2019 05:10 5.54 09:30 9.36 7.81 05:10 0.78 10:10 1.94 1.54 05:10 0.313 10:10 1.616 1.049 1.049 0.01 12/18/2019 05:25 5.50 09:35 9.34 7.55 05:15 0.77 09:30 2.01 1.51 05:15 0.307 09:30 1.678 0.982 0.982 0.01 12/19/2019 05:30 5.13 10:15 8.79 7.25 05:50 0.64 08:50 1.89 1.44 05:50 0.229 09:25 1.436 0.889 0.889 12/20/2019 05:55 5.08 10:25 8.81 7.33 05:50 0.66 10:40 1.98 1.44 05:50 0.233 10:40 1.522 0.899 0.899 12/21/2019 06:00 5.31 12:50 9.30 7.52 06:20 0.71 13:35 1.94 1.46 06:20 0.268 13:35 1.597 0.958 0.958 0.01 12/22/2019 05:40 5.29 14:10 9.35 7.61 06:40 0.71 12:35 1.91 1.47 06:40 0.270 14:05 1.590 0.984 0.984 0.41 12/23/2019 05:20 5.43 13:45 10.14 7.69 05:50 0.75 12:40 2.04 1.50 05:50 0.292 12:40 1.875 1.018 1.018 12/24/2019 05:50 5.47 12:45 8.86 7.36 06:20 0.76 12:45 1.79 1.42 06:20 0.300 12:45 1.394 0.891 0.891 0.02 12/25/2019 05:55 5.28 13:15 8.66 7.00 05:55 0.76 14:20 1.80 1.38 05:55 0.286 13:20 1.330 0.806 0.806 0.08 12/26/2019 05:45 5.37 12:50 8.46 7.23 06:20 0.75 11:25 1.83 1.43 06:20 0.290 11:25 1.327 0.877 0.877 12/27/2019 04:50 5.23 11:35 8.59 7.23 06:50 0.73 11:45 1.80 1.42 06:50 0.280 11:45 1.339 0.873 0.873 12/28/2019 06:00 5.24 13:05 9.09 7.34 07:00 0.71 13:05 1.84 1.42 07:00 0.265 13:05 1.481 0.900 0.900 12/29/2019 06:05 5.41 13:05 8.96 7.45 05:05 0.74 19:05 1.85 1.44 05:05 0.288 13:55 1.445 0.933 0.933 0.22 12/30/2019 05:55 5.39 12:15 8.77 7.44 06:05 0.74 11:50 1.88 1.48 06:05 0.285 11:55 1.436 0.947 0.947 12/31/2019 05:45 5.30 13:50 8.87 7.44 06:30 0.73 13:10 1.85 1.47 06:30 0.276 13:10 1.431 0.941 0.941 0.01 Daily Tabular Report
Daily Tabular Report For The Period 11/16/2019 00:00 - 03/09/2020 23:59 MIL_0715, Pipe Height: 30.50 in, Silt: 0.00 in
59 1356
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 01/01/2020 07:15 5.16 13:40 9.05 7.28 05:45 0.70 12:50 1.87 1.43 07:35 0.256 12:50 1.471 0.897 0.897 01/02/2020 06:05 4.74 11:00 8.50 7.00 04:45 0.55 10:05 1.84 1.37 06:20 0.180 10:35 1.303 0.816 0.816 01/03/2020 05:25 4.67 11:00 8.44 6.97 05:35 0.49 10:05 1.86 1.36 05:35 0.152 10:05 1.315 0.805 0.805 01/04/2020 05:25 4.58 13:10 8.88 7.03 05:50 0.46 11:30 1.86 1.36 05:50 0.140 13:15 1.431 0.838 0.838 01/05/2020 06:30 4.46 00:00 7.34 5.48 05:25 0.49 00:00 1.48 0.92 05:25 0.151 00:00 0.882 0.395 0.136 01/06/2020
01/07/2020
01/08/2020 00:00 00:00 0.02
01/09/2020 00:00 00:00 0.18
01/10/2020 05:00 5.24 09:25 9.13 7.53 04:35 0.69 09:25 1.92 1.46 04:35 0.259 09:25 1.555 0.954 0.950 0.02 01/11/2020 06:25 5.41 12:05 9.62 7.81 06:25 0.79 13:55 1.95 1.52 06:25 0.306 13:55 1.677 1.044 1.044 0.01 01/12/2020 05:55 5.29 13:55 9.60 7.87 06:55 0.71 13:35 1.95 1.54 06:55 0.271 13:35 1.696 1.079 1.079 01/13/2020 05:15 5.24 09:30 9.35 7.51 05:15 0.67 08:55 1.91 1.49 05:15 0.249 09:25 1.598 0.966 0.966 0.02 01/14/2020 05:30 5.42 09:30 9.25 7.54 05:45 0.76 21:20 1.90 1.47 05:45 0.293 09:30 1.517 0.957 0.957 0.11 01/15/2020 05:20 5.23 09:25 9.38 7.55 05:35 0.68 09:15 1.95 1.49 05:35 0.253 09:40 1.645 0.981 0.981 0.07 01/16/2020 05:10 5.23 21:20 9.32 7.82 05:50 0.69 09:40 1.91 1.55 05:50 0.260 22:05 1.571 1.069 1.069 0.66 01/17/2020 04:40 5.84 09:20 9.49 7.97 05:10 0.89 09:45 2.01 1.57 05:10 0.385 09:45 1.716 1.095 1.095 01/18/2020 05:40 5.93 12:00 9.83 8.11 05:25 0.89 12:10 1.93 1.59 05:25 0.395 12:10 1.726 1.141 1.141 01/19/2020 05:25 5.87 13:15 9.72 8.09 05:40 0.88 11:05 1.96 1.58 05:40 0.385 11:05 1.684 1.133 1.133 01/20/2020 05:45 5.79 13:15 9.57 8.16 04:55 0.86 12:00 1.96 1.61 04:55 0.373 12:00 1.687 1.172 1.172 01/21/2020 04:50 5.78 09:05 9.62 7.96 04:55 0.86 08:55 2.04 1.59 04:55 0.367 08:55 1.767 1.103 1.103 01/22/2020 04:45 5.74 09:10 9.55 7.85 05:40 0.85 21:10 2.00 1.55 05:40 0.364 21:10 1.668 1.056 1.056 0.03 01/23/2020 04:35 5.47 08:55 9.59 7.70 05:05 0.81 08:55 1.93 1.50 05:05 0.321 08:55 1.673 1.002 1.002 01/24/2020 05:35 5.49 10:20 9.49 7.61 05:15 0.78 09:40 1.89 1.47 05:15 0.312 10:35 1.616 0.967 0.967 01/25/2020 05:35 5.07 12:40 9.33 7.53 05:45 0.62 12:05 1.85 1.46 05:45 0.220 12:05 1.520 0.968 0.968 01/26/2020 05:15 5.13 12:55 9.46 7.67 04:35 0.72 11:50 1.92 1.49 05:00 0.260 11:50 1.591 1.006 1.006 0.16 01/27/2020 05:30 4.99 09:20 9.06 7.08 06:35 0.62 20:30 1.85 1.35 05:25 0.217 09:25 1.467 0.831 0.658 01/28/2020 05:50 4.73 09:00 8.68 6.92 20:00 0.44 08:55 1.82 1.31 06:10 0.167 08:55 1.371 0.779 0.649 0.01 01/29/2020 04:55 4.47 08:25 8.63 6.70 05:00 0.44 08:15 1.79 1.31 05:00 0.129 08:20 1.341 0.713 0.609 01/30/2020 05:55 4.42 09:45 8.51 6.66 05:40 0.41 10:10 1.80 1.26 05:40 0.120 09:45 1.298 0.705 0.705 01/31/2020 05:10 4.58 09:35 8.37 6.64 05:45 0.50 09:40 1.76 1.25 05:45 0.155 09:40 1.268 0.688 0.688 02/01/2020 05:55 4.44 13:35 9.49 7.23 06:15 0.43 13:20 1.85 1.36 06:15 0.126 13:20 1.566 0.886 0.886 02/02/2020 05:45 5.17 13:00 9.69 7.67 06:15 0.67 12:45 1.93 1.48 06:15 0.242 12:45 1.687 1.009 1.009 02/03/2020 05:35 4.71 09:20 9.25 7.18 04:55 0.55 09:35 1.97 1.39 05:25 0.174 09:35 1.621 0.865 0.865 02/04/2020 05:15 4.68 09:20 9.14 7.17 05:50 0.50 09:50 1.98 1.40 05:50 0.160 09:50 1.592 0.873 0.873 02/05/2020 05:10 4.59 09:30 9.27 7.09 05:35 0.51 09:40 1.88 1.37 05:35 0.157 09:40 1.554 0.838 0.838 02/06/2020 05:00 4.57 09:20 9.22 7.04 04:45 0.47 09:25 1.94 1.36 04:45 0.143 09:25 1.592 0.825 0.825 02/07/2020 04:55 4.73 09:30 9.22 7.12 04:55 0.52 09:20 2.01 1.37 04:55 0.166 09:20 1.643 0.840 0.840 02/08/2020 06:25 4.56 12:30 9.21 7.29 06:30 0.50 11:00 1.85 1.41 06:30 0.149 13:05 1.487 0.910 0.910 02/09/2020 06:00 4.75 13:05 9.32 7.46 06:00 0.52 12:40 1.88 1.43 06:00 0.167 12:40 1.545 0.955 0.955 02/10/2020 05:40 4.65 09:20 8.93 6.98 04:20 0.50 09:35 1.84 1.35 05:20 0.158 09:35 1.440 0.806 0.806 02/11/2020 05:25 4.67 09:15 8.80 6.99 04:40 0.53 08:45 1.89 1.35 04:40 0.171 09:05 1.425 0.806 0.806 02/12/2020 05:35 4.61 09:20 9.22 7.04 04:30 0.51 09:05 1.97 1.34 05:35 0.163 09:05 1.602 0.810 0.810 02/13/2020 05:55 4.87 09:20 9.05 7.15 05:30 0.59 09:35 1.96 1.37 05:30 0.198 09:35 1.570 0.840 0.840 02/14/2020 05:20 4.87 09:20 9.02 6.65 05:55 0.58 08:50 1.89 1.26 05:55 0.193 09:15 1.489 0.717 0.359 02/15/2020 05:35 4.89 13:15 9.39 7.63 05:40 0.64 13:25 1.86 1.49 05:40 0.214 13:25 1.572 0.999 0.999 02/16/2020 05:55 4.99 12:30 9.59 7.70 06:35 0.59 12:05 1.91 1.50 06:35 0.206 12:05 1.643 1.032 1.032 02/17/2020 05:50 5.13 11:00 9.50 7.80 05:25 0.67 10:40 1.96 1.52 06:05 0.238 11:10 1.674 1.057 1.057 02/18/2020 05:20 5.16 09:45 9.45 7.58 05:40 0.72 10:10 1.95 1.49 05:40 0.260 09:45 1.654 0.987 0.987 02/19/2020 05:15 5.24 09:25 9.63 7.60 05:55 0.70 09:55 1.96 1.49 05:55 0.263 09:30 1.698 0.989 0.989 02/20/2020 05:30 5.18 09:30 9.66 7.59 04:30 0.68 09:15 2.01 1.50 04:30 0.251 09:30 1.737 0.995 0.995 02/21/2020 05:00 5.15 09:45 9.55 7.57 04:45 0.65 09:40 2.02 1.49 04:45 0.235 09:40 1.746 0.988 0.988 02/22/2020 07:05 5.33 13:20 9.64 7.80 07:25 0.73 14:05 1.99 1.54 07:25 0.276 14:05 1.713 1.061 1.061 02/23/2020 07:45 5.27 14:20 9.65 7.91 08:00 0.74 12:45 1.99 1.55 08:00 0.275 14:20 1.711 1.103 1.103 02/24/2020 06:00 5.11 10:35 9.58 7.50 05:15 0.68 10:25 1.99 1.50 05:15 0.251 10:25 1.713 0.980 0.980 60 1357
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 02/25/2020 06:00 5.21 10:20 9.50 7.40 06:25 0.70 09:30 2.00 1.45 06:25 0.258 10:30 1.690 0.942 0.674 02/26/2020 05:10 5.21 09:15 9.76 7.63 05:05 0.69 08:50 2.07 1.51 05:05 0.255 08:50 1.790 1.009 1.009 02/27/2020 05:20 5.43 09:15 9.84 7.73 05:30 0.76 09:00 2.05 1.53 05:30 0.297 09:00 1.821 1.034 1.034 02/28/2020 05:30 5.39 09:25 9.70 7.73 05:25 0.74 09:35 2.03 1.54 05:25 0.285 09:35 1.784 1.040 1.040 02/29/2020 05:50 5.41 13:45 9.92 7.93 05:45 0.83 13:35 2.04 1.57 05:45 0.321 13:35 1.836 1.110 1.110 03/01/2020 06:05 5.44 13:15 9.97 8.20 06:10 0.75 11:50 2.09 1.60 06:10 0.292 11:50 1.882 1.197 1.197 03/02/2020 05:10 5.56 09:20 10.01 7.97 05:35 0.79 09:45 2.08 1.59 05:35 0.318 09:15 1.905 1.119 1.119 03/03/2020 05:25 5.45 09:45 10.15 8.02 05:20 0.75 09:20 2.18 1.60 05:20 0.294 09:45 2.004 1.148 1.148 03/04/2020 05:35 5.59 09:25 10.16 8.10 05:35 0.79 09:20 2.18 1.62 05:35 0.319 09:20 2.041 1.174 1.174 03/05/2020 05:25 5.71 09:35 10.10 8.11 05:30 0.82 09:05 2.14 1.65 05:30 0.341 09:35 1.971 1.183 1.183 03/06/2020 05:40 5.43 09:55 9.69 7.97 05:40 0.73 09:45 2.04 1.60 05:40 0.285 09:45 1.789 1.132 1.132 03/07/2020 06:10 5.39 13:25 10.11 8.26 06:05 0.73 17:05 2.11 1.65 06:05 0.281 13:05 1.947 1.243 1.243 03/08/2020 07:05 5.62 13:30 10.33 8.44 06:30 0.83 13:45 2.16 1.68 06:30 0.345 13:45 2.069 1.309 1.309 03/09/2020 05:55 5.69 22:20 9.71 8.15 04:50 0.83 21:40 2.07 1.65 04:50 0.350 21:40 1.825 1.199 1.198 Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Rain
(in)
Avg
Total

7.53 1.46
105.605

0.969

4.90 Report Summary For The Period 11/16/2019 00:00 - 03/09/2020 23:59 61 1358
Item # 16.

Site Commentary
Site Information
MIL_0744
Pipe Dimensions 15
Silt Level 0.00"
Overview
Site MIL_0744 functioned under normal conditions during the period Saturday, November 16, 2019 to Monday, March 9, 2020 . This site exhibited an observable response to the wet weather events of November 26, 2019 - November 27, 2019, December 7, 2019 - December 8, 2019, and January 16, 2020 - January 17, 2020. Surcharged conditions were experienced at this location. Review of the scattergraph shows that both free flow and backwater conditions were recorded during the study period.

Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted to date and support the relative accuracy of the flow monitor at this location.

Observations
Average flow depth, velocity, and quantity data observed during Saturday, November 16, 2019 to Monday, March 9, 2020 , along with observed minimum and maximum data, are provided in the following table.

Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 6.17 0.94 0.283
Minimum 2.74 0.16 0.080
Maximum 34.98 1.78 1.416
Time of Minimum 3/1/2020 5:45 AM 2/27/2020 5:30 PM 2/6/2020 3:40 AM Time of Maximum 3/8/2020 2:15 PM 3/8/2020 2:15 PM 3/8/2020 2:15 PM Data Quality
Data uptime observed during the Saturday, November 16, 2019 to the Monday, March 9, 2020 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period. Site installed later than other sites on November 22, 2019. Uptime reflects time in service.

Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
62 1359
Item # 16.

Latitude: 37.419309°
Longitude: -121.911002°
Site Sketch Profile View or Photo
Sensor Shot
22431
Additional Site Info. / Comments:

ADS Project Name:

ADS Project Number:

Milpitas.WWTFM.CA19-20
Wireless
Pipe Material
Antenna Location
Communication Information:

Manhole Pick / Vent Hole
No
PVC
Unbolted Normal
Good
Active Drop Connections Air Quality:

Communication Type
Normal
26'' 54''
Manhole Cover Manhole Frame
Pipe Condition:

Manhole Material:

Manhole Diameter (Approx.):

Manhole Depth (Approx. FT): Manhole Configuration
Concrete Good
5'
Manhole Condition:

Upstream 0-5 FT Manhole
Sensors / Devices:

Installation Confirmation:

Manhole Opening Diameter (in)
Silt Type
Hydraulic Comments:
0''
Single

0.25"
Manhole / Pipe Information:

Pressure Sensor Range (psi)
Confirmation Time:

0.00"
Peak Combo (CS4)
Pipe Size (HxW)
0''
Downlooker Physical Offset (in) Measurement Confidence (in) NA
Peak Velocity (fps)
Silt
6:52:52 AM 15.0" x 15.0"
Smooth flow with medium depth and velocity
0 - 5 psi
Depth of Flow (Wet DOF) (in) Range (Air DOF) (in)

5.50 Velocity Sensor Offset (in)

1.05 Installation Information
Circular
Monitor Series
Monitor Location:

Doppler Standard Ring and Crank
Manhole #
Installation Date:

Pipe Size (H x W)
Topside / Area Photo
Tuesday, November 12, 2019
Access
Temporary

15.0" x 15.0"
Traffic
744 Residential
Map
Installation Type:

Monitoring Location (Sensors):

MIL_0744
TRITON+
System Characteristics
Location Type
Pipe Shape Drive
Milpitas Temp Study 2019-20
Drive Light
Site Access Details:

Site Address /Location:

Site Name
Thompson Court and Machado Avenue
Flow Monitoring
Site Report
South Inlet
(Sensor Location)
North Outlet
63 1360
Item # 16.
64 1361
Item # 16.
65 1362
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 11/16/2019 00:00 00:00 00:00 00:00 00:00 00:00
11/17/2019 00:00 00:00 00:00 00:00 00:00 00:00
11/18/2019 00:00 00:00 00:00 00:00 00:00 00:00
11/19/2019 00:00 00:00 00:00 00:00 00:00 00:00
11/20/2019 00:00 00:00 00:00 00:00 00:00 00:00
11/21/2019 00:00 00:00 00:00 00:00 00:00 00:00
11/22/2019 23:50 5.35 22:20 7.49 6.47 14:55 0.82 09:25 1.13 1.01 15:05 0.250 22:25 0.403 0.333 0.214 11/23/2019 05:40 3.43 10:55 8.49 5.95 03:20 0.67 19:05 1.12 0.96 05:25 0.099 10:35 0.451 0.289 0.289 11/24/2019 05:30 3.43 10:25 8.27 6.10 05:25 0.64 14:15 1.09 0.87 05:25 0.088 10:25 0.454 0.270 0.270 11/25/2019 05:05 3.63 19:40 7.82 5.81 05:10 0.61 13:25 1.06 0.87 05:10 0.091 21:50 0.428 0.250 0.250 11/26/2019 03:10 3.81 21:40 8.27 6.02 03:20 0.64 16:55 1.06 0.91 03:20 0.103 21:45 0.435 0.272 0.272 0.36 11/27/2019 03:05 4.05 19:20 8.19 6.46 02:20 0.73 06:40 1.10 0.93 03:10 0.130 09:55 0.412 0.305 0.305 0.63 11/28/2019 05:25 4.07 12:05 9.02 6.58 05:45 0.72 21:55 1.09 0.85 05:40 0.126 14:30 0.469 0.285 0.285 11/29/2019 05:35 3.84 11:10 8.30 6.25 05:35 0.69 19:50 1.11 0.88 05:35 0.110 10:00 0.437 0.281 0.281 0.02 11/30/2019 06:05 3.92 10:55 8.34 6.32 05:45 0.67 21:35 1.09 0.89 05:45 0.111 14:00 0.456 0.287 0.287 0.10 12/01/2019 06:10 3.73 20:30 8.83 6.59 05:45 0.56 00:00 1.12 0.84 05:55 0.088 20:30 0.451 0.285 0.285 0.06 12/02/2019 03:30 3.89 21:20 8.59 6.30 03:00 0.61 17:55 1.12 0.94 03:00 0.105 21:15 0.458 0.303 0.303 0.30 12/03/2019 04:20 3.93 21:40 8.37 6.16 03:30 0.71 23:40 1.12 0.95 03:30 0.131 20:00 0.416 0.295 0.295 0.01 12/04/2019 03:45 3.94 19:55 8.06 6.37 04:05 0.69 07:10 1.14 0.89 04:05 0.129 21:20 0.425 0.287 0.287 0.39 12/05/2019 03:35 3.90 21:45 8.49 6.25 03:15 0.64 09:45 1.07 0.91 03:40 0.107 09:45 0.433 0.290 0.290 0.01 12/06/2019 05:10 4.03 20:55 7.82 6.20 04:10 0.71 07:30 1.12 0.95 04:10 0.126 19:30 0.422 0.296 0.296 0.01 12/07/2019 05:15 4.06 19:10 9.08 6.79 03:10 0.74 00:00 1.07 0.96 03:30 0.131 19:45 0.501 0.340 0.340 0.67 12/08/2019 05:05 4.47 10:05 9.22 7.10 03:50 0.77 08:05 1.12 0.98 03:50 0.179 09:45 0.508 0.363 0.363 0.20 12/09/2019 05:15 4.35 21:05 8.75 6.50 02:55 0.80 07:05 1.12 0.97 02:55 0.160 21:10 0.458 0.321 0.321 12/10/2019 02:40 4.22 21:55 8.12 6.28 03:25 0.68 07:05 1.13 0.96 03:25 0.126 21:05 0.417 0.305 0.305 12/11/2019 03:15 4.08 21:05 7.89 6.10 03:30 0.71 07:10 1.14 0.96 04:05 0.135 08:45 0.408 0.294 0.294 0.03 12/12/2019 03:25 3.80 22:20 8.06 6.16 04:00 0.69 07:55 1.11 0.94 04:00 0.123 21:55 0.434 0.293 0.293 0.01 12/13/2019 05:05 3.88 20:45 7.81 6.09 04:00 0.71 07:25 1.12 0.94 04:00 0.131 09:15 0.386 0.286 0.286 0.01 12/14/2019 05:35 3.92 13:45 8.88 6.45 03:55 0.70 00:20 1.07 0.89 03:10 0.128 11:55 0.433 0.290 0.290 0.01 12/15/2019 05:20 3.90 10:55 8.49 6.59 04:50 0.68 23:55 1.09 0.85 05:40 0.115 10:15 0.444 0.286 0.286 0.01 12/16/2019 03:35 3.88 09:10 10.28 6.53 09:35 0.54 00:00 1.06 0.82 03:35 0.113 08:35 0.440 0.272 0.272 0.01 12/17/2019 05:00 3.92 21:20 7.91 5.99 02:50 0.62 12:35 1.05 0.84 03:25 0.105 21:20 0.376 0.252 0.252 0.01 12/18/2019 03:15 3.76 21:55 8.23 6.22 04:05 0.59 23:40 1.00 0.82 03:15 0.094 21:50 0.372 0.259 0.259 0.01 12/19/2019 03:25 3.79 22:55 7.85 6.15 03:30 0.58 07:05 0.97 0.83 03:25 0.093 21:40 0.369 0.259 0.259 12/20/2019 03:25 3.78 21:20 7.56 6.10 03:35 0.61 07:30 1.12 0.91 03:35 0.097 08:40 0.399 0.282 0.282 12/21/2019 03:40 3.74 11:40 8.58 6.50 04:10 0.67 07:30 1.06 0.89 03:45 0.109 11:15 0.458 0.294 0.294 0.01 12/22/2019 05:35 3.73 13:45 9.05 6.67 06:00 0.62 00:10 0.97 0.85 05:45 0.098 13:45 0.417 0.295 0.295 0.41 12/23/2019 05:10 4.00 10:20 8.07 6.28 05:10 0.77 23:55 0.97 0.90 05:10 0.132 10:20 0.383 0.287 0.287 12/24/2019 05:00 3.90 19:30 7.77 6.23 05:00 0.76 23:25 0.97 0.90 05:00 0.124 19:30 0.369 0.283 0.283 0.02 12/25/2019 05:35 3.79 14:00 8.71 6.43 05:35 0.74 00:05 0.96 0.89 05:35 0.116 14:00 0.409 0.291 0.291 0.08 12/26/2019 05:05 3.79 19:15 8.07 6.15 05:05 0.74 23:50 0.97 0.89 05:05 0.116 19:15 0.383 0.278 0.278 12/27/2019 05:25 3.33 13:20 7.24 5.73 05:25 0.64 11:35 1.10 0.91 05:25 0.084 11:40 0.385 0.259 0.259 12/28/2019 05:10 3.31 12:10 8.23 5.96 04:00 0.61 00:00 1.10 0.90 05:10 0.083 12:05 0.417 0.272 0.272 12/29/2019 05:45 3.36 21:50 8.00 5.98 03:55 0.63 00:30 1.10 0.94 05:45 0.086 17:05 0.416 0.283 0.283 0.22 12/30/2019 03:50 3.56 13:15 7.37 5.84 03:50 0.69 11:45 1.09 0.95 03:50 0.099 13:10 0.395 0.276 0.276 12/31/2019 05:25 3.44 10:25 7.90 6.03 04:00 0.59 10:05 1.07 0.91 05:25 0.091 17:35 0.404 0.279 0.279 0.01 Daily Tabular Report
Daily Tabular Report For The Period 11/16/2019 00:00 - 03/09/2020 23:59 MIL_0744, Pipe Height: 15.00 in, Silt: 0.00 in
66 1363
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 01/01/2020 05:15 3.66 14:05 8.32 6.32 04:50 0.71 01:00 1.11 0.92 04:50 0.113 13:25 0.443 0.295 0.295 01/02/2020 04:10 3.69 19:50 7.90 6.20 03:20 0.71 07:50 1.13 0.93 04:05 0.111 22:40 0.405 0.291 0.291 01/03/2020 05:30 3.78 20:10 8.44 6.42 03:35 0.73 23:55 1.04 0.88 03:35 0.131 20:30 0.405 0.288 0.288 01/04/2020 05:15 3.92 13:50 8.35 6.36 03:45 0.72 17:55 1.06 0.92 03:45 0.122 14:00 0.434 0.301 0.301 01/05/2020 06:10 3.85 13:40 8.29 6.53 03:45 0.72 10:15 1.08 0.91 06:00 0.119 10:30 0.457 0.309 0.309 01/06/2020 03:50 3.65 21:45 8.05 6.02 04:05 0.67 07:25 1.10 0.91 03:25 0.103 19:30 0.433 0.277 0.277 01/07/2020 04:05 3.75 22:35 8.03 6.21 02:45 0.70 10:20 1.08 0.93 03:55 0.116 10:20 0.394 0.291 0.291 01/08/2020 05:20 3.62 22:25 8.27 6.07 03:20 0.71 07:20 1.08 0.91 03:25 0.112 19:00 0.409 0.277 0.277 0.02 01/09/2020 05:20 3.74 22:30 8.30 6.15 02:05 0.70 15:35 1.15 0.94 05:15 0.113 22:05 0.448 0.292 0.292 0.18 01/10/2020 05:35 3.96 19:15 8.00 6.23 04:55 0.76 06:50 1.15 0.94 03:15 0.136 09:00 0.422 0.296 0.296 0.02 01/11/2020 04:55 3.86 11:05 8.41 6.35 04:55 0.70 19:05 1.06 0.92 04:55 0.114 11:30 0.458 0.302 0.302 0.01 01/12/2020 05:20 3.86 14:25 8.71 6.51 04:05 0.69 11:40 1.10 0.91 04:05 0.113 11:50 0.457 0.309 0.309 01/13/2020 03:20 3.85 21:05 8.08 6.17 04:00 0.73 18:15 1.13 0.93 04:00 0.125 20:20 0.425 0.290 0.290 0.02 01/14/2020 03:00 3.81 08:40 7.99 5.78 03:10 0.70 07:30 1.12 0.95 03:10 0.112 08:35 0.410 0.273 0.273 0.11 01/15/2020 05:10 2.74 21:10 7.23 5.28 04:15 0.70 07:40 1.25 0.99 03:30 0.085 20:35 0.374 0.251 0.251 0.07 01/16/2020 03:30 2.82 19:35 8.52 5.88 04:05 0.73 07:05 1.20 0.99 03:20 0.095 19:25 0.458 0.287 0.287 0.66 01/17/2020 03:25 3.55 08:55 8.25 5.93 03:30 0.73 07:00 1.21 1.00 03:30 0.126 20:40 0.395 0.292 0.292 01/18/2020 05:20 3.05 11:40 8.04 6.00 21:10 0.77 00:10 1.19 0.97 05:25 0.118 11:15 0.441 0.287 0.287 01/19/2020 05:35 3.12 21:50 8.80 6.19 04:05 0.75 05:45 1.15 0.98 05:15 0.117 21:50 0.451 0.304 0.304 01/20/2020 05:30 4.11 13:40 9.28 6.70 16:00 0.76 06:35 1.21 1.00 05:30 0.157 13:30 0.459 0.339 0.339 01/21/2020 05:10 3.31 21:35 7.91 5.69 03:50 0.75 07:45 1.15 0.95 03:45 0.110 21:50 0.399 0.265 0.265 01/22/2020 03:25 3.21 22:40 8.31 5.88 03:15 0.71 07:40 1.13 0.95 03:25 0.095 22:15 0.419 0.276 0.276 0.03 01/23/2020 03:35 3.43 21:55 8.83 6.29 11:55 0.73 07:15 1.14 0.93 03:40 0.116 13:25 0.400 0.294 0.294 01/24/2020 05:10 3.85 22:20 8.39 6.52 22:20 0.86 07:45 1.00 0.95 05:10 0.148 22:20 0.393 0.312 0.312 01/25/2020 05:35 3.13 19:25 8.13 6.06 05:35 0.83 00:25 1.00 0.94 05:35 0.100 19:25 0.388 0.287 0.287 01/26/2020 05:30 2.96 11:10 8.51 6.24 05:30 0.81 00:30 1.00 0.92 05:30 0.089 11:10 0.394 0.291 0.291 0.16 01/27/2020 03:35 3.19 21:25 8.09 5.82 03:35 0.84 00:00 1.00 0.96 03:35 0.104 21:25 0.387 0.276 0.276 01/28/2020 05:10 3.08 20:00 8.74 5.85 20:00 0.83 15:25 1.00 0.95 05:10 0.097 20:00 0.396 0.276 0.276 0.01 01/29/2020 03:25 3.18 21:30 8.17 5.84 03:25 0.84 18:05 1.00 0.96 03:25 0.103 21:30 0.389 0.278 0.278 01/30/2020 03:20 3.43 22:25 7.77 5.66 03:20 0.87 23:50 1.00 0.97 03:20 0.119 22:25 0.379 0.269 0.269 01/31/2020 05:05 3.20 19:30 7.81 5.71 05:05 0.84 23:35 1.00 0.96 05:05 0.105 19:30 0.380 0.271 0.271 02/01/2020 03:25 3.10 10:00 7.71 5.75 03:25 0.83 23:40 1.00 0.95 03:25 0.098 10:00 0.377 0.272 0.272 02/02/2020 03:40 3.31 12:30 8.50 6.00 12:30 0.85 08:30 1.00 0.94 03:40 0.112 12:30 0.394 0.282 0.282 02/03/2020 03:30 3.48 21:30 7.92 5.75 03:30 0.88 07:30 1.00 0.96 03:30 0.123 21:30 0.383 0.273 0.273 02/04/2020 03:15 3.53 08:50 7.21 5.32 03:15 0.89 17:00 1.00 0.98 03:15 0.126 08:50 0.360 0.249 0.249 02/05/2020 02:55 2.93 21:45 6.87 5.14 06:25 0.80 07:40 1.25 1.02 02:55 0.087 11:25 0.400 0.253 0.253 02/06/2020 03:40 2.80 19:10 7.96 5.29 03:15 0.74 07:40 1.23 1.00 03:40 0.080 19:15 0.385 0.254 0.254 02/07/2020 03:55 2.91 21:20 7.10 5.29 03:00 0.72 11:55 1.19 1.02 03:00 0.083 08:55 0.379 0.260 0.260 02/08/2020 05:30 3.06 15:15 25.11 5.77 15:25 0.16 23:40 1.11 0.92 03:30 0.094 16:20 0.407 0.241 0.241 02/09/2020 05:30 3.30 11:15 8.27 6.03 11:20 0.73 00:00 1.17 0.96 05:55 0.101 11:15 0.470 0.291 0.291 02/10/2020 03:35 3.12 21:00 7.73 5.70 05:15 0.74 07:30 1.23 0.97 03:40 0.091 19:50 0.418 0.273 0.273 02/11/2020 04:50 3.17 22:25 8.30 6.09 22:05 0.71 07:25 1.15 0.90 03:05 0.091 09:05 0.394 0.275 0.275 02/12/2020 03:10 2.94 19:25 7.95 5.79 19:55 0.74 07:20 1.26 0.98 02:50 0.093 19:10 0.408 0.279 0.279 02/13/2020 03:25 2.94 19:55 7.12 5.34 04:00 0.77 07:35 1.24 1.05 03:35 0.089 21:50 0.415 0.270 0.270 02/14/2020 03:30 3.03 08:45 7.87 5.43 03:35 0.77 07:25 1.27 1.05 03:35 0.088 20:05 0.424 0.274 0.274 02/15/2020 05:15 3.12 10:45 8.15 5.71 04:35 0.73 00:05 1.18 1.00 04:35 0.093 10:40 0.436 0.282 0.282 02/16/2020 05:35 2.89 12:30 7.85 5.72 04:00 0.78 00:50 1.18 0.97 06:00 0.091 11:25 0.460 0.270 0.270 02/17/2020 05:00 3.07 20:15 7.73 5.73 04:35 0.72 23:40 1.13 0.93 04:40 0.091 20:05 0.425 0.265 0.265 02/18/2020 03:20 2.98 19:45 7.61 5.52 02:35 0.75 00:00 1.18 1.00 04:50 0.095 18:50 0.389 0.268 0.268 02/19/2020 03:35 3.04 21:40 8.09 5.55 22:00 0.74 10:30 1.26 1.00 03:25 0.094 19:45 0.404 0.271 0.271 02/20/2020 03:40 3.06 21:05 11.07 6.09 22:30 0.51 07:25 1.20 0.95 03:05 0.104 23:05 0.444 0.272 0.272 02/21/2020 03:10 3.58 08:15 9.33 6.13 08:15 0.65 23:30 1.11 0.95 02:45 0.110 18:55 0.393 0.290 0.290 02/22/2020 06:00 3.24 10:30 8.20 6.00 10:50 0.72 08:10 1.19 0.96 06:05 0.111 10:35 0.443 0.287 0.287 02/23/2020 05:35 2.93 10:50 8.46 6.10 05:25 0.76 18:10 1.14 0.94 05:25 0.084 12:40 0.437 0.288 0.288 02/24/2020 04:55 3.37 20:45 7.93 5.75 04:50 0.75 07:30 1.15 0.95 04:10 0.103 19:25 0.414 0.270 0.270 67 1364
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 02/25/2020 03:35 3.02 22:25 7.81 5.65 04:15 0.75 07:20 1.24 0.97 03:15 0.102 21:25 0.403 0.270 0.270 02/26/2020 03:15 3.11 19:35 9.23 6.17 19:25 0.67 07:30 1.18 0.93 03:30 0.092 20:30 0.419 0.282 0.282 02/27/2020 04:20 3.28 17:30 19.17 6.12 17:30 0.16 09:35 1.13 0.89 04:30 0.100 09:00 0.545 0.262 0.262 02/28/2020 05:05 3.30 08:55 7.51 5.69 03:55 0.77 06:55 1.14 0.97 02:55 0.107 08:35 0.414 0.269 0.269 02/29/2020 05:50 3.23 13:15 23.46 5.72 13:20 0.16 18:15 1.22 0.96 04:30 0.094 14:20 0.502 0.257 0.257 03/01/2020 05:45 2.74 21:25 7.88 5.70 04:25 0.78 18:25 1.22 1.00 04:25 0.084 11:45 0.433 0.283 0.283 03/02/2020 05:05 2.90 20:10 7.69 5.28 02:40 0.80 18:20 1.20 1.03 03:30 0.091 19:20 0.422 0.264 0.264 03/03/2020 05:00 2.90 21:50 7.93 5.37 03:25 0.83 07:25 1.24 1.07 03:25 0.099 21:25 0.429 0.277 0.277 03/04/2020 05:00 2.99 20:25 7.84 5.43 02:35 0.89 07:45 1.23 1.05 02:35 0.102 21:15 0.418 0.276 0.276 03/05/2020 03:15 2.84 20:00 7.32 5.44 04:15 0.80 06:55 1.23 1.05 03:25 0.089 19:50 0.415 0.278 0.278 03/06/2020 03:05 2.95 21:00 7.50 5.53 03:15 0.86 07:25 1.22 1.05 03:15 0.096 21:10 0.399 0.283 0.283 03/07/2020 03:35 2.92 20:05 7.83 5.79 13:45 0.89 19:00 1.20 1.05 03:45 0.107 12:35 0.454 0.300 0.300 03/08/2020 04:00 3.28 14:15 34.98 16.56 11:00 0.26 14:15 1.78 0.71 05:10 0.110 14:15 1.416 0.316 0.316 03/09/2020 23:55 4.57 06:40 25.25 11.60 03:20 0.16 11:30 1.20 0.81 03:20 0.125 07:05 0.472 0.300 0.300 Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Rain
(in)
Avg
Total

6.17 0.94

30.779

0.283

4.90 Report Summary For The Period 11/16/2019 00:00 - 03/09/2020 23:59 68 1365
Item # 16.

Site Commentary
Site Information
MIL_1043
Pipe Dimensions 20.75
Silt Level 0.00"
Overview
Site MIL_1043 functioned under normal conditions during the period Saturday, November 16, 2019 to Monday, March 9, 2020 . This site exhibited a small response to the wet weather events of November 26, 2019 - November 27, 2019, December 7, 2019 - December 8, 2019, and January 16, 2020 - January 17, 2020. Review of the scattergraph shows that free flow conditions were recorded during the study period.

Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted to date and support the relative accuracy of the flow monitor at this location.

This location was installed downstream of MIL_1193. A review of balancing of combined flows MIL_1043 and MIL_2840 shows a net flow of 0.663 MGD.

Observations
Average flow depth, velocity, and quantity data observed during Saturday, November 16, 2019 to Monday, March 9, 2020 , along with observed minimum and maximum data, are provided in the following table.

Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 5.25 4.00 1.263
Minimum 3.29 1.93 0.306
Maximum 7.55 4.98 2.432
Time of Minimum 2/26/2020 3:35 AM 3/2/2020 4:00 AM 3/2/2020 4:00 AM Time of Maximum 12/7/2019 6:15 PM 11/28/2019 12:30 PM 12/7/2019 6:15 PM Data Quality
Data uptime observed during the Saturday, November 16, 2019 to the Monday, March 9, 2020 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.

Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
69 1366
Item # 16.

Latitude: 37.436384°
Longitude: -121.887700°
Site Sketch Profile View or Photo
Sensor Shot
22431.11.325
Additional Site Info. / Comments:

ADS Project Name:

ADS Project Number:

Milpitas.WWTFM.CA2019-2020
Wireless
Pipe Material
Antenna Location
Communication Information:

Drilled Pavement / Concrete
No
Concrete
Unbolted Normal
Good
Active Drop Connections Air Quality:

Communication Type
Normal
26'' 54''
Manhole Cover Manhole Frame
Pipe Condition:

Manhole Material:

Manhole Diameter (Approx.):

Manhole Depth (Approx. FT): Manhole Configuration
Concrete Good
10'
Manhole Condition:

Upstream 0-5 FT Manhole
Sensors / Devices:

Installation Confirmation:

Manhole Opening Diameter (in)
Silt Type
Hydraulic Comments:
0''
Single

0.25"
Manhole / Pipe Information:

Pressure Sensor Range (psi)
Confirmation Time:

Peak Combo (CS4)
Pipe Size (HxW)

0.0"
Downlooker Physical Offset (in) Measurement Confidence (in) NA
Peak Velocity (fps)
Silt (in)
6:52:00 AM 20.75"x20.75"
Medium depth with fast velocity and small waves
0 - 5 psi
Depth of Flow (Wet DOF) (in) Range (Air DOF) (in)

6.38"
Velocity Sensor Offset (in)

4.50'
Installation Information
Circular
Monitor Series
Monitor Location:

Doppler Standard Ring and Crank
Manhole #
Installation Date:

Pipe Size (H x W)
Topside / Area Photo
Thursday, November 14, 2019
Access
Temporary

20.75"x20.75"
Traffic
1043 Residential/Commercial
Map
Installation Type:

Monitoring Location (Sensors):

MIL_1043
TRITON+
System Characteristics
Location Type
Pipe Shape DRIVE.

Milpitas Temp Study 2019-20
Drive Medium
Site Access Details:

Site Address /Location:

Site Name
Ayer St and Park Hill Dr, Milpitas, CA
Flow Monitoring
Site Report
North Outlet
South Inlet
(Sensor Location)
70 1367
Item # 16.
71 1368
Item # 16.
72 1369
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 11/16/2019 03:25 3.55 10:30 6.60 5.43 04:55 2.20 13:25 4.68 3.94 04:55 0.387 10:25 1.915 1.316 1.316 11/17/2019 04:45 3.48 10:40 6.86 5.50 04:30 2.20 21:10 4.74 3.99 04:30 0.373 10:50 2.066 1.366 1.366 11/18/2019 03:25 3.47 07:55 6.71 5.27 02:20 2.15 20:15 4.73 3.94 04:20 0.372 07:55 2.002 1.251 1.251 11/19/2019 04:35 3.51 08:05 6.55 5.27 02:55 2.17 07:35 4.63 3.90 04:20 0.381 08:05 1.888 1.238 1.238 11/20/2019 04:25 3.59 08:10 6.63 5.26 03:30 2.11 07:55 4.70 3.91 03:30 0.377 08:00 1.938 1.235 1.235 11/21/2019 04:25 3.59 07:55 6.68 5.27 03:35 2.20 18:15 4.70 3.93 03:35 0.400 07:55 1.961 1.242 1.242 11/22/2019 03:35 3.58 08:05 6.49 5.26 04:25 2.14 08:05 4.62 3.94 04:25 0.382 08:05 1.873 1.240 1.240 11/23/2019 04:30 3.47 11:00 6.70 5.31 04:00 2.13 11:20 4.71 3.94 04:30 0.361 11:25 1.978 1.276 1.276 11/24/2019 04:40 3.49 11:10 6.75 5.35 04:45 2.07 11:35 4.82 4.00 04:45 0.350 11:10 2.035 1.314 1.314 11/25/2019 04:10 3.45 08:05 6.32 5.12 03:20 2.21 21:55 4.65 3.95 04:10 0.371 08:10 1.811 1.203 1.203 11/26/2019 04:10 3.51 08:00 6.68 5.18 03:45 2.13 07:55 4.82 3.94 03:45 0.373 08:00 2.033 1.223 1.223 0.36 11/27/2019 03:10 3.66 10:10 6.24 5.40 02:35 2.38 21:15 4.64 4.07 03:10 0.439 10:25 1.771 1.324 1.324 0.63 11/28/2019 05:00 3.43 12:10 7.05 5.30 05:00 2.28 12:30 4.98 3.98 05:00 0.375 12:30 2.164 1.288 1.288 11/29/2019 04:05 3.40 11:15 6.18 5.05 04:20 2.25 11:50 4.70 3.95 04:05 0.390 11:15 1.731 1.177 1.177 0.02 11/30/2019 03:45 3.41 13:15 6.57 5.17 04:10 2.13 11:50 4.69 3.97 05:00 0.357 11:50 1.931 1.237 1.237 0.10 12/01/2019 04:55 3.42 12:45 6.70 5.38 04:15 2.23 18:20 4.74 4.03 04:55 0.366 12:40 2.007 1.334 1.334 0.06 12/02/2019 04:05 3.40 08:15 6.81 5.23 03:05 2.10 08:10 4.75 4.03 03:05 0.348 08:05 2.038 1.267 1.267 0.30 12/03/2019 03:25 3.41 07:55 6.43 5.21 04:25 2.14 20:25 4.64 3.96 04:25 0.375 08:00 1.848 1.232 1.232 0.01 12/04/2019 03:25 3.52 08:05 6.61 5.39 03:25 2.25 08:05 4.77 4.02 03:25 0.383 08:05 1.984 1.303 1.303 0.39 12/05/2019 04:35 3.53 21:35 6.46 5.29 04:10 2.17 07:55 4.66 3.94 04:35 0.392 07:55 1.859 1.251 1.251 0.01 12/06/2019 03:30 3.58 08:15 6.57 5.31 04:45 2.24 17:25 4.62 3.94 03:35 0.402 08:15 1.812 1.253 1.253 0.01 12/07/2019 03:25 3.55 18:15 7.55 5.61 04:25 2.22 18:05 4.90 4.04 04:35 0.392 18:15 2.432 1.417 1.417 0.67 12/08/2019 05:05 3.60 10:55 6.83 5.53 03:35 2.44 20:20 4.75 4.14 05:05 0.436 10:50 2.054 1.404 1.404 0.20 12/09/2019 04:25 3.52 08:05 6.43 5.18 02:40 2.03 20:30 4.71 4.01 02:40 0.364 08:10 1.859 1.233 1.233 12/10/2019 03:50 3.45 20:50 6.38 5.17 03:45 2.11 20:55 4.68 3.95 03:45 0.356 20:55 1.845 1.212 1.212 12/11/2019 04:40 3.56 08:10 6.39 5.27 03:30 2.17 20:40 4.62 3.92 04:30 0.387 08:15 1.813 1.240 1.240 0.03 12/12/2019 04:00 3.48 08:00 6.35 5.23 04:05 2.10 08:00 4.60 3.89 04:05 0.356 08:00 1.811 1.220 1.220 0.01 12/13/2019 04:15 3.58 07:55 6.35 5.28 03:15 2.15 07:40 4.63 3.91 03:15 0.386 07:55 1.776 1.237 1.237 0.01 12/14/2019 04:35 3.57 11:05 6.65 5.42 03:25 2.20 14:05 4.68 3.99 03:35 0.397 11:05 1.941 1.322 1.322 0.01 12/15/2019 04:35 3.40 10:50 6.87 5.42 04:15 2.20 10:30 4.71 4.03 04:30 0.380 11:05 2.051 1.347 1.347 0.01 12/16/2019 04:30 3.60 21:20 6.36 5.20 02:40 2.30 21:50 4.66 4.06 03:20 0.422 21:15 1.834 1.256 1.256 0.01 12/17/2019 04:40 3.67 21:55 6.25 5.17 04:25 2.49 21:00 4.67 4.04 04:25 0.460 21:55 1.774 1.229 1.229 0.01 12/18/2019 02:50 3.51 07:50 6.31 5.19 02:55 2.23 22:05 4.68 3.99 02:55 0.390 22:10 1.802 1.232 1.232 0.01 12/19/2019 03:05 3.54 08:25 6.38 5.25 03:20 2.23 07:45 4.71 3.98 03:20 0.399 07:45 1.813 1.246 1.246 12/20/2019 04:25 3.57 08:05 6.32 5.30 04:40 2.18 18:50 4.68 3.97 04:40 0.399 08:05 1.764 1.259 1.259 12/21/2019 03:40 3.66 11:55 6.52 5.36 03:30 2.26 14:00 4.67 4.00 04:50 0.418 12:00 1.888 1.302 1.302 0.01 12/22/2019 04:25 3.43 11:00 6.61 5.31 04:15 2.19 19:35 4.75 4.05 04:15 0.379 11:30 1.930 1.304 1.304 0.41 12/23/2019 04:30 3.45 11:00 5.94 5.12 04:25 2.20 12:40 4.62 4.06 04:25 0.373 11:00 1.640 1.224 1.224 12/24/2019 03:55 3.63 11:50 6.41 5.19 03:30 2.26 12:55 4.78 4.06 03:30 0.414 11:50 1.833 1.252 1.252 0.02 12/25/2019 05:15 3.42 11:15 6.51 5.03 05:25 2.23 11:15 4.72 4.04 05:25 0.387 11:15 1.924 1.190 1.190 0.08 12/26/2019 04:25 3.47 10:10 6.37 5.05 05:00 2.35 10:05 4.67 3.99 04:25 0.406 10:10 1.830 1.188 1.188 12/27/2019 03:50 3.48 11:45 6.05 5.10 04:30 2.30 22:05 4.61 4.02 04:25 0.393 12:15 1.655 1.207 1.207 12/28/2019 04:25 3.43 12:05 6.46 5.14 04:45 2.13 12:10 4.64 3.97 04:45 0.373 12:05 1.865 1.220 1.220 12/29/2019 03:55 3.47 11:55 6.51 5.16 04:35 2.16 10:45 4.73 4.01 04:35 0.381 11:50 1.894 1.242 1.242 0.22 12/30/2019 04:30 3.55 11:30 6.10 5.11 03:30 2.27 12:45 4.79 4.06 03:30 0.396 12:45 1.717 1.226 1.226 12/31/2019 04:25 3.70 18:20 6.24 5.21 04:20 2.55 19:10 4.68 4.13 04:20 0.469 18:20 1.787 1.275 1.275 0.01 Daily Tabular Report
Daily Tabular Report For The Period 11/16/2019 00:00 - 03/09/2020 23:59 MIL_1043, Pipe Height: 20.75 in, Silt: 0.00 in
73 1370
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 01/01/2020 05:40 3.47 12:10 6.24 5.04 05:20 2.63 12:00 4.67 4.08 05:40 0.463 12:10 1.796 1.205 1.205 01/02/2020 03:45 3.46 21:10 6.01 5.08 03:35 2.27 21:50 4.59 4.05 03:50 0.392 20:30 1.657 1.208 1.208 01/03/2020 03:00 3.59 19:45 6.07 5.21 03:10 2.28 20:50 4.58 4.04 04:15 0.419 19:45 1.682 1.248 1.248 01/04/2020 03:30 3.45 12:45 6.72 5.30 04:55 2.41 12:10 4.72 4.03 04:55 0.408 12:10 1.988 1.299 1.299 01/05/2020 04:25 3.38 10:25 6.66 5.37 04:20 2.27 20:30 4.76 4.08 04:20 0.382 20:30 1.966 1.341 1.341 01/06/2020 04:00 3.46 20:35 6.33 5.15 03:40 2.12 19:45 4.73 4.04 04:15 0.376 20:35 1.813 1.235 1.235 01/07/2020 03:25 3.53 21:00 6.38 5.16 04:50 2.25 21:00 4.66 3.96 03:30 0.400 21:00 1.848 1.216 1.216 01/08/2020 03:55 3.50 09:50 6.39 5.25 03:45 2.18 20:45 4.63 3.94 03:45 0.375 21:00 1.820 1.242 1.242 0.02 01/09/2020 04:10 3.49 08:00 6.57 5.28 04:10 2.25 21:05 4.62 3.97 04:10 0.379 08:00 1.894 1.262 1.262 0.18 01/10/2020 03:10 3.51 08:05 6.34 5.23 03:50 2.12 08:05 4.61 3.96 03:55 0.364 08:05 1.808 1.238 1.238 0.02 01/11/2020 04:05 3.58 11:35 6.58 5.31 04:35 2.26 10:30 4.77 4.01 04:35 0.416 11:45 1.934 1.292 1.292 0.01 01/12/2020 04:10 3.46 12:20 6.82 5.38 03:55 2.24 10:15 4.76 4.09 03:55 0.385 12:15 2.034 1.349 1.349 01/13/2020 03:45 3.50 07:55 6.35 5.08 02:25 2.25 08:00 4.68 4.04 03:20 0.396 08:00 1.839 1.212 1.212 0.02 01/14/2020 02:30 3.65 08:00 6.31 5.11 02:10 2.42 21:45 4.74 4.01 02:35 0.451 21:45 1.839 1.209 1.209 0.11 01/15/2020 04:30 3.33 20:40 6.32 5.07 04:35 2.47 21:35 4.66 4.03 04:35 0.391 20:40 1.805 1.202 1.202 0.07 01/16/2020 03:25 3.54 20:35 6.43 5.32 03:20 2.27 13:05 4.79 4.08 03:30 0.393 20:25 1.902 1.311 1.311 0.66 01/17/2020 03:40 3.54 09:00 6.89 5.19 04:30 2.32 08:15 4.66 4.07 04:30 0.409 09:00 2.050 1.251 1.251 01/18/2020 04:00 3.48 11:15 6.56 5.21 04:05 2.28 12:15 4.72 4.07 04:05 0.385 11:15 1.916 1.274 1.274 01/19/2020 05:00 3.38 11:00 6.68 5.19 04:40 2.31 10:55 4.73 4.07 04:40 0.376 11:00 1.993 1.271 1.271 01/20/2020 04:05 3.48 21:10 6.45 5.22 04:05 2.39 14:45 4.80 4.11 04:05 0.402 21:10 1.886 1.284 1.284 01/21/2020 03:45 3.56 21:55 6.25 5.05 04:35 2.24 20:45 4.78 4.05 04:35 0.401 21:50 1.795 1.197 1.197 01/22/2020 03:00 3.54 21:35 6.48 5.12 04:05 2.17 19:20 4.75 4.06 04:05 0.382 20:55 1.905 1.228 1.228 0.03 01/23/2020 04:35 3.50 08:05 6.41 5.15 03:30 2.13 07:20 4.67 4.03 03:30 0.369 08:00 1.835 1.228 1.228 01/24/2020 03:15 3.53 10:35 6.15 5.26 04:20 2.15 19:40 4.60 4.04 03:45 0.374 10:35 1.697 1.275 1.275 01/25/2020 05:20 3.52 11:35 6.75 5.30 04:20 2.18 11:25 4.69 4.01 04:20 0.382 11:35 1.967 1.286 1.286 01/26/2020 04:10 3.54 12:15 6.80 5.42 03:40 2.33 19:40 4.68 4.09 04:10 0.415 11:30 2.006 1.352 1.352 0.16 01/27/2020 03:40 3.39 20:55 6.46 5.17 04:15 2.16 20:05 4.70 4.02 03:40 0.370 20:50 1.889 1.240 1.240 01/28/2020 04:15 3.51 20:30 6.46 5.11 03:55 2.17 20:30 4.71 3.98 03:35 0.378 20:30 1.898 1.208 1.208 0.01 01/29/2020 04:20 3.46 21:05 6.37 5.15 03:50 2.09 22:15 4.66 3.99 03:50 0.369 19:50 1.819 1.220 1.220 01/30/2020 03:45 3.58 21:55 6.44 5.21 04:30 2.14 20:50 4.78 3.98 02:50 0.392 20:50 1.917 1.237 1.237 01/31/2020 04:00 3.40 08:05 6.34 5.18 02:55 2.12 18:35 4.69 3.98 04:00 0.361 08:10 1.782 1.228 1.228 02/01/2020 04:15 3.53 10:45 6.85 5.42 04:15 2.34 10:05 4.76 4.06 04:15 0.401 10:45 2.032 1.344 1.344 02/02/2020 04:50 3.38 11:35 7.06 5.34 03:50 2.18 12:00 4.87 4.09 03:50 0.370 12:00 2.186 1.340 1.340 02/03/2020 03:50 3.43 21:10 6.29 5.02 03:40 2.25 19:25 4.72 4.05 03:40 0.380 21:10 1.832 1.194 1.194 02/04/2020 04:15 3.40 20:45 6.49 5.05 04:10 2.22 20:55 4.72 4.04 04:10 0.363 20:45 1.911 1.203 1.203 02/05/2020 03:10 3.42 20:45 6.34 5.05 03:00 2.20 21:05 4.71 4.02 03:00 0.369 21:00 1.849 1.197 1.197 02/06/2020 04:10 3.37 21:25 6.28 5.06 03:40 2.13 20:45 4.68 4.02 04:10 0.358 21:25 1.801 1.198 1.198 02/07/2020 03:25 3.49 08:05 6.37 5.09 03:30 2.12 07:50 4.64 4.00 03:20 0.367 08:05 1.806 1.200 1.200 02/08/2020 03:55 3.49 11:45 6.62 5.31 03:55 2.14 12:10 4.70 4.08 03:55 0.360 11:50 1.952 1.310 1.310 02/09/2020 04:25 3.38 10:45 6.81 5.32 03:40 2.22 10:50 4.80 4.09 03:40 0.370 10:50 2.066 1.331 1.331 02/10/2020 04:15 3.47 08:00 6.61 5.08 02:50 2.28 20:50 4.77 4.08 04:10 0.386 08:00 1.958 1.223 1.223 02/11/2020 04:40 3.47 08:05 6.35 5.01 03:15 2.18 20:00 4.67 4.00 03:15 0.365 20:45 1.806 1.176 1.176 02/12/2020 04:10 3.35 08:05 6.35 5.07 04:15 2.16 08:15 4.67 4.02 04:15 0.345 08:15 1.828 1.204 1.204 02/13/2020 04:10 3.32 07:55 6.36 5.07 03:30 2.19 07:55 4.70 4.00 04:10 0.349 07:55 1.852 1.198 1.198 02/14/2020 04:00 3.40 08:05 6.19 5.14 04:55 2.19 18:10 4.60 4.00 04:00 0.360 07:55 1.735 1.215 1.215 02/15/2020 04:25 3.41 10:45 6.81 5.38 04:40 2.24 11:05 4.66 4.03 04:25 0.388 11:05 1.992 1.323 1.323 02/16/2020 03:40 3.34 11:15 6.86 5.34 03:30 2.18 10:30 4.67 3.98 03:45 0.367 11:10 2.015 1.308 1.308 02/17/2020 04:25 3.43 10:45 6.50 5.28 04:05 2.14 10:55 4.62 3.99 03:50 0.380 10:55 1.868 1.277 1.277 02/18/2020 04:25 3.30 20:20 6.30 5.10 03:20 2.24 20:10 4.62 4.01 04:20 0.368 20:20 1.798 1.208 1.208 02/19/2020 03:00 3.45 22:00 6.53 5.22 03:25 2.20 18:35 4.58 3.95 03:00 0.372 22:00 1.855 1.238 1.238 02/20/2020 03:30 3.38 21:10 6.55 5.32 04:45 2.12 20:55 4.80 3.93 04:35 0.357 20:55 1.911 1.265 1.265 02/21/2020 04:15 3.53 09:10 6.47 5.36 04:55 2.16 09:10 4.57 3.91 03:35 0.381 09:10 1.845 1.273 1.273 02/22/2020 04:25 3.42 11:25 7.00 5.53 04:25 2.07 09:20 4.67 3.93 04:25 0.340 11:25 2.061 1.355 1.355 02/23/2020 04:40 3.39 11:05 6.89 5.59 03:45 2.17 12:50 4.70 4.02 04:40 0.370 10:55 2.051 1.410 1.410 02/24/2020 04:05 3.43 21:45 6.49 5.24 04:30 2.15 20:10 4.71 3.98 04:30 0.365 21:40 1.863 1.255 1.255 74 1371
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 02/25/2020 03:20 3.52 21:50 6.55 5.24 03:50 2.11 20:40 4.66 3.93 03:50 0.374 20:45 1.907 1.239 1.239 02/26/2020 03:35 3.29 08:05 6.65 5.27 04:15 2.06 21:30 4.65 3.89 04:15 0.337 08:05 1.927 1.241 1.241 02/27/2020 04:05 3.36 07:55 6.60 5.31 04:30 2.04 20:10 4.56 3.90 03:20 0.341 08:00 1.868 1.250 1.250 02/28/2020 02:55 3.41 08:35 6.63 5.35 04:05 2.12 20:10 4.55 3.90 04:05 0.355 08:35 1.870 1.264 1.264 02/29/2020 04:10 3.42 11:30 6.93 5.55 04:20 2.04 18:05 4.64 3.95 04:20 0.340 11:30 2.053 1.364 1.364 03/01/2020 04:55 3.36 11:05 6.91 5.51 04:20 2.09 10:40 4.83 4.00 04:20 0.342 10:40 2.097 1.380 1.380 03/02/2020 04:00 3.34 07:50 6.60 5.23 04:00 1.93 07:35 4.69 3.94 04:00 0.306 07:50 1.945 1.239 1.239 03/03/2020 04:00 3.29 08:00 6.50 5.23 04:10 2.04 19:50 4.63 3.88 04:35 0.336 08:05 1.856 1.226 1.226 03/04/2020 03:30 3.40 07:55 6.73 5.31 04:05 2.14 07:55 4.83 3.91 04:05 0.353 07:55 2.059 1.256 1.256 03/05/2020 04:50 3.42 20:15 6.57 5.32 04:25 2.15 20:15 4.63 3.92 04:00 0.362 20:15 1.912 1.264 1.264 03/06/2020 04:10 3.53 08:00 6.59 5.43 03:55 2.06 07:50 4.56 3.89 03:55 0.354 07:55 1.887 1.286 1.286 03/07/2020 04:45 3.52 11:35 7.03 5.66 03:35 2.14 12:30 4.70 3.96 04:45 0.376 12:30 2.101 1.410 1.410 03/08/2020 05:15 3.65 11:40 7.12 5.65 03:50 2.10 09:50 4.77 4.02 03:50 0.378 11:40 2.161 1.427 1.427 03/09/2020 02:35 3.46 20:35 6.75 5.39 02:35 2.06 20:10 4.72 3.95 02:35 0.343 20:10 1.980 1.296 1.295 Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Rain
(in)
Avg
Total

5.25 4.00
145.284

1.263

4.90 Report Summary For The Period 11/16/2019 00:00 - 03/09/2020 23:59 75 1372
Item # 16.

Site Commentary
Site Information
MIL_1193
Pipe Dimensions 21
Silt Level 0.00"
Overview
Site MIL_1193 functioned under normal conditions during the period Saturday, November 16, 2019 to Monday, March 9, 2020 . This site exhibited a small response to the wet weather events of November 26, 2019 - November 27, 2019, December 7, 2019 - December 8, 2019, and January 16, 2020 - January 17, 2020. Review of the scattergraph shows that free flow conditions were recorded during the study period.

Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted to date and support the relative accuracy of the flow monitor at this location. Due to a meter malfunction, data confidence is less than typical during December 16, 2019 through December 20, 2019. A data gap occurs during December 20, 2020 at 10:00 pm through December 27, 2020 at 6:00 am.

This location was installed upstream of sites MIL_1043 and MIL_2840. (See MIL_1043 and MIL_2840 Site Commentary for More Details)
Observations
Average flow depth, velocity, and quantity data observed during Saturday, November 16, 2019 to Monday, March 9, 2020 , along with observed minimum and maximum data, are provided in the following table.

Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 4.15 2.59 0.600
Minimum 2.34 1.36 0.136
Maximum 6.11 3.72 1.368
Time of Minimum 11/19/2019 4:20 AM 3/4/2020 3:15 AM 2/18/2020 3:50 AM Time of Maximum 1/8/2020 9:25 AM 2/2/2020 1:10 PM 1/8/2020 9:25 AM Data Quality
Data uptime observed during the Saturday, November 16, 2019 to the Monday, March 9, 2020 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.

Percent Uptime
Depth (in) 95
Velocity (ft/s) 95
Quantity (MGD) 95
76 1373
Item # 16.

Latitude: 37.426666°
Longitude: -121.883676°
Site Sketch Profile View or Photo
Sensor Shot
22431.11.325
Additional Site Info. / Comments:

ADS Project Name:

ADS Project Number:

Milpitas.WWTFM.CA2019-2020
Wireless
Pipe Material
Antenna Location
Communication Information:

Drilled Pavement / Concrete
No
Concrete
Unbolted Normal
Good
Active Drop Connections Air Quality:

Communication Type
Normal
26'' 54''
Manhole Cover Manhole Frame
Pipe Condition:

Manhole Material:

Manhole Diameter (Approx.):

Manhole Depth (Approx. FT): Manhole Configuration
Concrete Good
15'
Manhole Condition:

Upstream 0-5 FT Manhole
Sensors / Devices:

Installation Confirmation:

Manhole Opening Diameter (in)
Silt Type
Hydraulic Comments:
0''
Single

0.25"
Manhole / Pipe Information:

Pressure Sensor Range (psi)
Confirmation Time:

Peak Combo (CS4)
Pipe Size (HxW)

0.0"
Downlooker Physical Offset (in) Measurement Confidence (in) NA
Peak Velocity (fps)
Silt (in)
8:09:00 AM 21.00"x21.00"
Smooth flow with medium depth and moderate velocity
0 - 5 psi
Depth of Flow (Wet DOF) (in) Range (Air DOF) (in)

5.13"
Velocity Sensor Offset (in)

3.50'
Installation Information
Circular
Monitor Series
Monitor Location:

Doppler Standard Ring and Crank
Manhole #
Installation Date:

Pipe Size (H x W)
Topside / Area Photo
Thursday, November 14, 2019
Access
Temporary

21.00"x21.00"
Traffic
1193 Residential/Commercial
Map
Installation Type:

Monitoring Location (Sensors):

MIL_1193
TRITON+
System Characteristics
Location Type
Pipe Shape DRIVE.

Milpitas Temp Study 2019-20
Drive Light
Site Access Details:

Site Address /Location:

Site Name
Yosemite Dr and Dempsey Rd, Milpitas, CA
Flow Monitoring
Site Report
North Outlet
South Inlet
(Sensor Location)
77 1374
Item # 16.
78 1375
Item # 16.
79 1376
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 11/16/2019 04:20 2.45 10:35 4.97 4.10 05:00 1.62 12:00 3.42 2.66 04:20 0.176 10:35 0.938 0.607 0.607 11/17/2019 05:25 2.41 10:20 5.31 4.16 04:00 1.60 10:20 3.60 2.76 05:25 0.161 10:20 1.111 0.653 0.653 11/18/2019 03:15 2.54 07:45 5.11 4.01 04:40 1.67 07:50 3.54 2.62 04:40 0.186 07:50 1.027 0.572 0.572 11/19/2019 04:20 2.34 07:50 5.05 3.92 04:45 1.62 21:40 3.44 2.61 04:15 0.161 07:50 0.981 0.555 0.555 11/20/2019 04:20 2.37 07:50 5.24 3.99 04:15 1.53 07:45 3.48 2.57 04:15 0.150 07:50 1.053 0.558 0.558 11/21/2019 03:55 2.39 07:45 5.11 4.01 03:45 1.52 22:00 3.50 2.59 03:55 0.149 07:45 0.993 0.568 0.568 11/22/2019 03:55 2.37 07:50 5.13 4.02 03:40 1.60 07:45 3.50 2.56 03:40 0.156 07:50 1.024 0.560 0.560 11/23/2019 05:30 2.36 09:00 5.14 4.12 05:25 1.52 12:00 3.58 2.68 05:25 0.149 10:40 1.038 0.617 0.617 11/24/2019 04:20 2.41 11:05 5.21 4.23 04:10 1.54 10:50 3.62 2.67 04:10 0.154 10:50 1.080 0.643 0.643 11/25/2019 04:20 2.44 21:45 5.13 4.08 02:35 1.54 07:45 3.51 2.51 04:00 0.164 07:45 0.991 0.566 0.566 11/26/2019 04:10 2.42 20:40 5.20 4.09 04:10 1.49 07:40 3.55 2.51 04:10 0.148 07:40 1.050 0.570 0.570 0.36 11/27/2019 03:10 2.64 09:30 5.03 4.20 04:20 1.57 10:45 3.25 2.59 03:10 0.189 10:55 0.908 0.604 0.604 0.63 11/28/2019 04:45 2.37 10:55 5.34 4.12 04:35 1.47 13:10 3.60 2.57 04:35 0.143 11:50 1.082 0.598 0.598 11/29/2019 03:55 2.43 10:55 5.14 4.02 04:35 1.47 10:50 3.16 2.45 04:35 0.154 10:50 0.933 0.542 0.542 0.02 11/30/2019 04:55 2.46 12:45 5.23 4.20 04:05 1.47 13:35 3.30 2.53 04:45 0.152 13:35 0.968 0.603 0.603 0.10 12/01/2019 04:10 2.43 11:50 5.43 4.32 04:30 1.43 21:05 3.39 2.60 04:30 0.143 11:45 1.051 0.651 0.651 0.06 12/02/2019 03:10 2.51 21:30 5.46 4.18 03:35 1.43 08:00 3.38 2.51 03:35 0.151 21:30 1.067 0.588 0.588 0.30 12/03/2019 04:20 2.52 07:45 5.36 4.09 02:40 1.52 07:45 3.30 2.49 04:20 0.166 07:45 1.032 0.562 0.562 0.01 12/04/2019 03:05 2.53 21:40 5.18 4.13 02:55 1.54 07:45 3.55 2.54 02:55 0.167 07:15 0.999 0.578 0.578 0.39 12/05/2019 04:00 2.48 20:45 5.23 4.13 04:00 1.41 07:35 3.39 2.51 04:00 0.145 21:35 0.967 0.573 0.573 0.01 12/06/2019 04:05 2.59 07:55 5.18 4.14 04:00 1.56 07:55 3.18 2.49 04:00 0.173 07:55 0.949 0.567 0.567 0.01 12/07/2019 04:00 2.60 18:00 5.68 4.33 04:15 1.64 18:20 3.54 2.65 04:15 0.184 18:00 1.195 0.656 0.656 0.67 12/08/2019 04:35 2.68 19:10 5.37 4.34 04:25 1.67 10:50 3.61 2.73 04:25 0.194 13:05 1.058 0.676 0.676 0.20 12/09/2019 04:15 2.60 07:35 5.25 4.16 03:20 1.56 07:55 3.42 2.53 03:20 0.178 07:45 1.007 0.582 0.582 12/10/2019 03:20 2.50 20:30 5.44 4.17 03:00 1.49 20:30 3.36 2.52 03:00 0.159 20:30 1.073 0.586 0.586 12/11/2019 04:10 2.56 21:40 5.63 4.24 04:20 1.42 21:40 3.48 2.56 04:20 0.157 21:40 1.167 0.609 0.609 0.03 12/12/2019 03:45 2.61 08:00 5.53 4.22 02:45 1.52 08:00 3.41 2.55 02:45 0.182 08:00 1.116 0.599 0.599 0.01 12/13/2019 03:15 2.66 21:35 5.49 4.27 04:40 1.54 21:35 3.39 2.59 04:40 0.184 21:35 1.096 0.616 0.616 0.01 12/14/2019 04:25 2.68 09:00 5.35 4.33 04:10 1.51 09:00 3.29 2.61 04:10 0.180 09:00 1.027 0.638 0.638 0.01 12/15/2019 05:25 2.56 10:25 5.50 4.42 04:30 1.43 10:35 3.34 2.66 04:30 0.155 10:35 1.069 0.682 0.682 0.01 12/16/2019 04:15 2.75 07:35 5.13 4.18 03:45 1.54 21:25 3.51 2.60 03:45 0.189 07:40 0.985 0.598 0.598 0.01 12/17/2019 04:35 2.63 20:25 5.30 4.10 03:55 1.68 21:20 3.51 2.57 04:30 0.196 20:55 1.018 0.578 0.578 0.01 12/18/2019 03:30 2.63 21:30 5.12 4.10 03:10 1.58 21:35 3.52 2.56 03:10 0.183 21:35 0.959 0.578 0.578 0.01 12/19/2019 04:00 2.53 07:40 5.23 4.03 04:50 1.51 07:45 3.32 2.50 04:50 0.164 19:55 0.941 0.551 0.551 12/20/2019 04:50 2.56 08:05 5.23 4.14 04:20 1.53 08:10 3.17 2.50 04:20 0.167 08:10 0.941 0.572 0.467 12/21/2019 00:00 00:00 00:00 00:00 00:00 00:00 0.01
12/22/2019 00:00 00:00 00:00 00:00 00:00 00:00 0.41
12/23/2019 00:00 00:00 00:00 00:00 00:00 00:00
12/24/2019 00:00 00:00 00:00 00:00 00:00 00:00 0.02
12/25/2019 00:00 00:00 00:00 00:00 00:00 00:00 0.08
12/26/2019 00:00 00:00 00:00 00:00 00:00 00:00
12/27/2019 05:50 2.90 21:50 5.20 4.47 06:15 1.82 21:35 3.54 2.72 05:50 0.246 21:50 1.001 0.669 0.506 12/28/2019 04:55 2.49 19:50 5.39 4.16 02:50 1.60 19:50 3.32 2.53 05:35 0.171 19:50 1.048 0.591 0.591 12/29/2019 05:20 2.49 13:20 5.33 4.25 05:10 1.43 10:30 3.33 2.57 05:10 0.150 13:20 1.019 0.622 0.622 0.22 12/30/2019 04:30 2.52 22:00 5.16 4.18 04:30 1.59 21:05 3.56 2.59 04:30 0.168 21:05 0.977 0.605 0.605 12/31/2019 03:55 2.95 18:45 5.17 4.26 03:20 1.72 10:55 3.61 2.64 03:20 0.233 10:55 1.013 0.623 0.623 0.01 Daily Tabular Report
Daily Tabular Report For The Period 11/16/2019 00:00 - 03/09/2020 23:59 MIL_1193, Pipe Height: 21.00 in, Silt: 0.00 in
80 1377
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 01/01/2020 05:15 2.39 11:45 5.15 4.10 05:20 1.57 10:50 3.47 2.56 05:15 0.162 12:00 0.966 0.581 0.581 01/02/2020 03:25 2.60 22:00 5.08 4.14 03:25 1.59 22:00 3.29 2.54 03:25 0.177 22:00 0.956 0.577 0.577 01/03/2020 03:45 2.44 18:00 4.98 4.16 03:50 1.57 18:00 3.20 2.56 03:50 0.166 18:00 0.903 0.587 0.587 01/04/2020 03:35 2.46 12:25 5.60 4.24 03:35 1.56 12:25 3.46 2.62 03:35 0.159 12:25 1.152 0.630 0.630 01/05/2020 04:40 2.54 19:05 5.53 4.30 03:25 1.52 21:30 3.68 2.66 04:30 0.174 19:05 1.117 0.657 0.657 01/06/2020 03:55 2.54 19:20 5.25 4.22 04:10 1.54 19:20 3.37 2.55 04:10 0.172 19:20 1.025 0.599 0.599 01/07/2020 04:15 2.51 19:45 5.19 4.19 04:05 1.48 19:40 3.23 2.52 04:05 0.161 19:45 0.962 0.589 0.589 01/08/2020 03:25 2.37 09:25 6.11 4.17 03:35 1.50 09:25 3.64 2.53 03:35 0.146 09:25 1.368 0.590 0.590 0.02 01/09/2020 03:20 2.58 07:50 5.26 4.19 04:00 1.63 21:25 3.17 2.51 04:00 0.181 07:45 0.958 0.587 0.587 0.18 01/10/2020 04:05 2.45 07:45 5.30 4.18 03:50 1.57 21:50 3.24 2.53 03:50 0.162 07:50 0.975 0.586 0.586 0.02 01/11/2020 04:35 2.59 10:00 5.33 4.27 04:25 1.60 10:10 3.36 2.64 04:25 0.177 10:10 1.002 0.641 0.641 0.01 01/12/2020 04:25 2.60 17:45 5.36 4.31 03:35 1.53 20:55 3.68 2.73 04:25 0.171 10:40 1.056 0.676 0.676 01/13/2020 03:55 2.51 20:30 5.25 4.14 03:35 1.55 07:45 3.49 2.55 03:50 0.166 07:45 1.015 0.584 0.584 0.02 01/14/2020 04:05 2.57 20:45 5.29 4.15 02:55 1.62 08:00 3.53 2.55 04:20 0.181 21:25 1.010 0.588 0.588 0.11 01/15/2020 03:15 2.44 07:40 5.26 4.10 03:55 1.47 21:35 3.65 2.55 03:55 0.150 07:40 1.037 0.582 0.582 0.07 01/16/2020 04:10 2.57 07:30 5.12 4.15 05:05 1.58 07:45 3.57 2.71 04:15 0.180 09:20 0.994 0.623 0.623 0.66 01/17/2020 04:10 2.52 09:00 5.10 4.13 03:50 1.54 07:50 3.55 2.59 04:25 0.165 07:50 0.955 0.590 0.590 01/18/2020 03:35 2.53 12:45 5.43 4.18 03:55 1.55 11:00 3.59 2.66 03:35 0.174 12:45 1.028 0.629 0.629 01/19/2020 04:30 2.48 09:55 5.32 4.23 04:20 1.49 12:00 3.65 2.65 04:20 0.161 10:40 1.063 0.638 0.638 01/20/2020 03:45 2.54 19:20 5.33 4.24 04:55 1.57 21:05 3.64 2.62 04:20 0.173 19:05 1.016 0.627 0.627 01/21/2020 04:20 2.48 07:35 5.29 4.12 03:15 1.59 21:30 3.53 2.55 03:15 0.172 21:30 1.001 0.580 0.580 01/22/2020 03:40 2.43 19:45 5.18 4.15 04:05 1.54 21:35 3.63 2.61 04:05 0.161 21:35 1.044 0.601 0.601 0.03 01/23/2020 04:15 2.48 07:45 5.07 4.07 04:25 1.52 21:35 3.49 2.58 04:25 0.159 07:45 1.001 0.577 0.577 01/24/2020 04:10 2.41 09:15 5.16 4.16 04:00 1.59 08:30 3.20 2.61 04:00 0.158 21:45 0.906 0.602 0.602 01/25/2020 03:50 2.45 12:55 5.15 4.09 04:20 1.61 10:55 3.57 2.63 04:20 0.166 10:55 1.024 0.600 0.600 01/26/2020 04:50 2.40 17:30 5.02 4.10 04:50 1.62 12:05 3.57 2.77 04:50 0.159 11:35 0.980 0.635 0.635 0.16 01/27/2020 04:20 2.39 18:30 5.05 4.01 04:30 1.53 21:20 3.64 2.63 04:20 0.150 21:05 0.975 0.578 0.578 01/28/2020 03:50 2.36 08:00 5.34 3.95 04:25 1.54 21:40 3.61 2.63 03:50 0.152 08:00 1.085 0.564 0.564 0.01 01/29/2020 03:55 2.49 08:15 5.17 4.05 04:25 1.56 19:25 3.46 2.58 04:25 0.171 21:05 0.963 0.574 0.574 01/30/2020 03:40 2.46 21:50 5.27 4.10 03:05 1.60 20:30 3.46 2.56 03:50 0.167 21:35 0.988 0.581 0.581 01/31/2020 04:10 2.48 08:15 5.19 4.10 03:10 1.59 07:50 3.46 2.55 03:55 0.166 07:35 0.969 0.574 0.574 02/01/2020 04:35 2.56 10:25 5.55 4.29 04:35 1.60 10:35 3.48 2.64 04:35 0.172 10:25 1.134 0.644 0.644 02/02/2020 04:25 2.41 11:50 5.28 4.23 04:35 1.59 13:10 3.72 2.72 04:25 0.159 11:50 1.137 0.660 0.660 02/03/2020 04:10 2.43 20:05 5.25 4.09 04:05 1.50 21:05 3.50 2.61 04:05 0.150 20:00 0.981 0.589 0.589 02/04/2020 04:00 2.43 19:50 5.22 4.07 04:10 1.60 20:30 3.49 2.59 04:00 0.162 07:35 1.013 0.581 0.581 02/05/2020 03:05 2.47 21:15 5.43 4.08 03:45 1.63 20:20 3.51 2.55 03:05 0.171 21:15 1.066 0.575 0.575 02/06/2020 04:15 2.46 21:10 5.27 4.13 04:30 1.54 08:00 3.46 2.52 04:15 0.161 08:00 1.009 0.578 0.578 02/07/2020 03:50 2.46 19:20 5.09 4.15 03:25 1.64 07:35 3.36 2.56 03:50 0.171 19:20 0.964 0.589 0.589 02/08/2020 03:45 2.52 09:00 5.25 4.25 04:50 1.65 10:10 3.58 2.71 04:50 0.179 12:25 1.010 0.654 0.654 02/09/2020 04:50 2.40 14:25 5.04 4.08 04:40 1.53 20:15 3.64 2.80 04:40 0.152 10:45 1.024 0.644 0.644 02/10/2020 04:20 2.46 22:10 5.05 3.97 03:20 1.62 21:40 3.49 2.64 03:50 0.167 07:45 0.992 0.572 0.572 02/11/2020 04:20 2.42 07:45 5.00 3.95 03:00 1.52 07:40 3.59 2.62 03:00 0.155 07:40 1.005 0.563 0.563 02/12/2020 04:05 2.39 18:55 5.04 3.99 03:50 1.49 20:05 3.46 2.60 03:50 0.150 07:50 0.946 0.566 0.566 02/13/2020 03:50 2.37 19:10 5.07 3.98 02:30 1.64 19:50 3.49 2.61 03:50 0.159 19:50 0.983 0.567 0.567 02/14/2020 04:15 2.40 08:55 4.98 4.00 03:35 1.52 21:50 3.46 2.66 03:35 0.160 07:25 0.907 0.580 0.580 02/15/2020 04:40 2.38 11:00 5.12 4.08 04:30 1.54 11:00 3.66 2.73 04:30 0.150 11:00 1.075 0.623 0.623 02/16/2020 04:20 2.35 13:40 5.13 4.11 04:40 1.48 18:55 3.60 2.67 04:40 0.143 18:55 0.994 0.618 0.618 02/17/2020 04:00 2.49 12:40 5.15 4.17 04:30 1.41 10:15 3.49 2.61 04:30 0.151 11:45 0.969 0.614 0.614 02/18/2020 04:00 2.36 19:55 5.24 4.10 03:50 1.41 20:00 3.45 2.51 03:50 0.136 20:00 0.966 0.571 0.571 02/19/2020 03:40 2.47 21:35 5.18 4.09 04:10 1.49 21:25 3.31 2.47 04:10 0.157 21:40 0.979 0.558 0.558 02/20/2020 03:40 2.48 21:40 5.25 4.12 03:35 1.49 21:15 3.18 2.51 03:35 0.158 21:40 0.960 0.573 0.573 02/21/2020 04:00 2.47 08:50 5.03 4.10 04:15 1.52 20:45 3.09 2.50 04:15 0.159 08:50 0.878 0.565 0.565 02/22/2020 03:20 2.58 11:00 5.51 4.23 04:20 1.48 10:35 3.37 2.59 04:25 0.169 10:45 1.081 0.621 0.621 02/23/2020 05:10 2.60 11:05 5.23 4.25 03:45 1.55 20:55 3.66 2.76 04:15 0.176 12:25 1.035 0.671 0.671 02/24/2020 04:20 2.44 20:45 5.13 4.08 02:10 1.50 21:25 3.50 2.61 04:20 0.162 19:45 0.975 0.589 0.589 81 1378
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 02/25/2020 04:15 2.51 21:15 5.13 4.05 04:30 1.54 20:25 3.58 2.57 04:00 0.163 20:25 1.004 0.574 0.574 02/26/2020 04:15 2.39 21:00 5.36 4.11 03:55 1.45 21:05 3.50 2.53 04:15 0.144 21:40 1.058 0.579 0.579 02/27/2020 04:20 2.42 07:40 5.31 4.14 04:00 1.38 07:35 3.56 2.51 04:00 0.140 07:40 1.097 0.580 0.580 02/28/2020 03:15 2.43 07:30 5.41 4.16 04:15 1.49 07:45 3.46 2.49 03:20 0.152 07:40 1.029 0.577 0.577 02/29/2020 03:45 2.39 11:10 5.42 4.27 05:25 1.42 11:10 3.26 2.59 05:25 0.148 11:10 1.037 0.635 0.635 03/01/2020 05:00 2.40 19:00 5.40 4.33 04:35 1.40 20:05 3.57 2.65 04:35 0.137 22:15 1.089 0.671 0.671 03/02/2020 04:00 2.39 07:50 5.24 4.11 03:50 1.43 07:20 3.56 2.53 03:55 0.143 07:35 1.031 0.582 0.582 03/03/2020 04:05 2.43 07:20 5.26 4.13 02:45 1.46 07:45 3.41 2.53 04:05 0.157 21:15 0.997 0.584 0.584 03/04/2020 04:10 2.40 20:25 5.49 4.13 03:15 1.36 07:30 3.54 2.53 03:15 0.139 20:25 1.099 0.585 0.585 03/05/2020 04:20 2.38 21:15 5.45 4.19 04:15 1.42 07:35 3.33 2.53 04:15 0.139 07:35 1.053 0.595 0.595 03/06/2020 04:05 2.45 07:30 5.37 4.18 03:50 1.43 07:35 3.33 2.53 03:50 0.146 07:45 1.036 0.591 0.591 03/07/2020 04:30 2.55 10:30 5.47 4.32 05:00 1.58 10:10 3.36 2.64 04:15 0.174 10:10 1.079 0.655 0.655 03/08/2020 04:30 2.57 11:35 5.58 4.40 03:05 1.52 20:35 3.60 2.69 04:30 0.170 12:00 1.135 0.689 0.689 03/09/2020 03:15 2.47 19:55 5.60 4.21 03:15 1.41 19:40 3.48 2.55 03:15 0.144 19:55 1.100 0.602 0.602 Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Rain
(in)
Avg
Total

4.15 2.59

65.190

0.600

4.90 Report Summary For The Period 11/16/2019 00:00 - 03/09/2020 23:59 82 1379
Item # 16.

Site Commentary
Site Information
MIL_1564
Pipe Dimensions 8
Silt Level 0.00"
Overview
Site MIL_1564 functioned under normal conditions during the period Saturday, November 16, 2019 to Monday, March 9, 2020 . This site exhibited an observable response to the wet weather events of November 26, 2019 - November 27, 2019 and December 7, 2019 - December 8, 2019. Surcharge conditions were experienced at this location. Review of the scattergraph shows that both free flow and backwater flows were recorded during the study period.

Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted to date and support the relative accuracy of the flow monitor at this location.

Observations
Average flow depth, velocity, and quantity data observed during Saturday, November 16, 2019 to Monday, March 9, 2020 , along with observed minimum and maximum data, are provided in the following table.

Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 1.60 2.40 0.078
Minimum 1.17 0.49 0.011
Maximum 21.57 4.82 0.785
Time of Minimum 2/10/2020 4:45 AM 2/16/2020 4:10 AM 2/16/2020 4:10 AM Time of Maximum 1/29/2020 6:30 PM 1/24/2020 9:45 PM 1/29/2020 6:20 PM Data Quality
Data uptime observed during the Saturday, November 16, 2019 to the Monday, March 9, 2020 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.

Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
83 1380
Item # 16.

Latitude: 37.449480°
Longitude: -121.887946°
Site Sketch Profile View or Photo
Sensor Shot
MIL_1564
TRITON+
System Characteristics
Location Type
Pipe Shape DRIVE.

Milpitas Temp Study 2019-20
Drive Medium
Site Access Details:

Site Address /Location:

Site Name
Country Club Dr and Park Victoria Dr, Milpitas, CA
Flow Monitoring
Site Report
Installation Information
Circular
Monitor Series
Monitor Location:

Doppler Standard Ring and Crank
Manhole #
Installation Date:

Pipe Size (H x W)
Topside / Area Photo
Thursday, November 14, 2019
Access
Temporary

8.00"x8.00"
Traffic
1564 Residential/Commercial
Map
Installation Type:

Monitoring Location (Sensors):

Peak Combo (CS4)
Pipe Size (HxW)

0.0"
Downlooker Physical Offset (in) Measurement Confidence (in) NA
Peak Velocity (fps)
Silt (in)
4:25:00 AM 8.00"x8.00"
Shallow depth with moderate velocity
0 - 5 psi
Depth of Flow (Wet DOF) (in) Range (Air DOF) (in)

0.63"
Velocity Sensor Offset (in)

1.69 Upstream 0-5 FT Manhole
Sensors / Devices:

Installation Confirmation:

Manhole Opening Diameter (in)
Silt Type
Hydraulic Comments:
0''
Single

0.25"
Manhole / Pipe Information:

Pressure Sensor Range (psi)
Confirmation Time:
26'' 54''
Manhole Cover Manhole Frame
Pipe Condition:

Manhole Material:

Manhole Diameter (Approx.):

Manhole Depth (Approx. FT): Manhole Configuration
Concrete Good
4'
Manhole Condition:
22431.11.325
Additional Site Info. / Comments:

ADS Project Name:

ADS Project Number:

Milpitas.WWTFM.CA2019-2020
Wireless
Pipe Material
Antenna Location
Communication Information:

Drilled Pavement / Concrete
No
Concrete
Unbolted Normal
Good
Active Drop Connections Air Quality:

Communication Type
Normal
West Outlet
East Inlet
(Sensor Location)
84 1381
Item # 16.
85 1382
Item # 16.
86 1383
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 11/16/2019 05:00 1.30 08:25 1.81 1.47 04:40 0.86 09:30 4.23 2.63 04:40 0.021 09:30 0.149 0.076 0.076 11/17/2019 03:45 1.28 23:55 1.80 1.49 06:40 1.25 08:50 4.53 2.74 06:40 0.030 08:50 0.143 0.081 0.081 11/18/2019 16:10 1.46 07:10 2.48 1.70 05:20 1.07 10:15 4.44 2.45 05:20 0.034 10:15 0.174 0.086 0.086 11/19/2019 03:35 1.34 22:15 1.94 1.64 04:55 0.92 09:30 4.01 2.31 04:55 0.023 09:30 0.146 0.079 0.079 11/20/2019 04:35 1.46 21:20 2.10 1.74 05:35 1.42 12:40 3.62 2.30 05:35 0.040 21:25 0.152 0.085 0.085 11/21/2019 03:45 1.52 08:25 2.08 1.81 03:35 1.04 10:25 3.44 1.96 03:35 0.031 10:25 0.152 0.077 0.077 11/22/2019 04:40 1.58 09:35 2.22 1.91 04:35 1.08 10:25 3.01 1.86 04:35 0.035 08:40 0.152 0.079 0.079 11/23/2019 04:35 1.61 09:55 2.28 1.88 04:35 1.15 21:10 3.21 1.91 04:35 0.037 09:50 0.147 0.079 0.079 11/24/2019 07:10 1.54 00:40 1.88 1.69 02:55 1.20 21:50 3.80 2.33 02:55 0.037 10:20 0.133 0.082 0.082 11/25/2019 04:30 1.46 11:50 1.89 1.65 05:40 1.17 08:25 4.05 2.35 05:40 0.034 08:25 0.164 0.081 0.081 11/26/2019 04:15 1.56 20:20 2.05 1.75 03:40 1.42 20:20 4.47 2.40 03:40 0.044 20:20 0.204 0.089 0.089 0.63 11/27/2019 01:55 1.61 10:25 2.08 1.85 03:55 1.45 11:25 3.80 2.46 01:55 0.047 08:45 0.166 0.099 0.099 0.77 11/28/2019 04:50 1.55 11:45 2.01 1.73 04:50 1.39 11:50 4.51 2.66 04:50 0.043 11:50 0.191 0.097 0.097 11/29/2019 22:55 1.42 00:40 1.88 1.59 03:45 1.36 11:15 4.28 2.70 06:20 0.040 11:20 0.159 0.086 0.086 0.05 11/30/2019 05:50 1.39 13:45 1.82 1.60 05:25 1.34 12:15 3.97 2.68 05:25 0.036 12:15 0.147 0.087 0.087 0.14 12/01/2019 05:35 1.40 21:15 1.98 1.68 04:15 1.20 17:55 3.81 2.44 04:15 0.035 12:15 0.149 0.086 0.086 0.06 12/02/2019 03:00 1.51 08:10 2.16 1.76 05:00 0.97 23:10 3.86 2.23 05:00 0.029 08:15 0.177 0.084 0.084 0.36 12/03/2019 22:45 1.46 10:15 1.88 1.61 17:00 1.32 21:15 4.72 2.67 17:00 0.042 10:15 0.171 0.087 0.087 12/04/2019 11:30 1.40 07:55 1.75 1.53 04:40 1.40 10:40 4.59 2.85 04:40 0.041 10:40 0.157 0.086 0.086 0.44 12/05/2019 04:20 1.43 13:55 1.76 1.59 04:30 1.36 22:05 4.29 2.57 04:30 0.037 22:05 0.134 0.083 0.083 12/06/2019 04:20 1.44 23:05 1.80 1.62 04:15 1.22 10:10 3.99 2.56 04:15 0.034 10:10 0.147 0.084 0.084 0.06 12/07/2019 21:05 1.36 10:05 1.97 1.60 04:10 1.39 19:05 4.67 2.81 04:10 0.041 10:05 0.186 0.090 0.090 0.84 12/08/2019 13:00 1.35 20:55 1.72 1.48 13:10 1.51 11:50 4.66 3.18 13:10 0.039 11:50 0.159 0.091 0.091 0.10 12/09/2019 04:20 1.37 09:55 1.66 1.49 03:25 1.50 09:35 4.20 2.83 03:25 0.039 09:00 0.138 0.082 0.082 12/10/2019 03:20 1.40 22:05 1.90 1.59 04:35 1.43 22:05 4.26 2.75 04:35 0.039 22:05 0.175 0.089 0.089 0.01 12/11/2019 04:25 1.47 21:10 1.96 1.73 04:20 1.27 10:20 3.80 2.49 04:20 0.036 21:30 0.146 0.091 0.091 0.00 12/12/2019 04:25 1.50 05:35 2.06 1.75 04:20 1.21 09:00 3.66 2.20 04:20 0.036 05:35 0.154 0.082 0.082 12/13/2019 04:00 1.55 01:20 2.04 1.77 03:55 1.41 09:25 3.48 2.26 03:55 0.043 09:25 0.154 0.085 0.085 12/14/2019 04:25 1.49 00:10 1.93 1.68 04:35 1.21 08:25 4.21 2.69 04:35 0.036 08:25 0.160 0.093 0.093 0.01 12/15/2019 18:20 1.37 12:10 1.85 1.56 04:10 1.21 11:55 4.69 2.87 04:10 0.035 12:10 0.173 0.090 0.090 12/16/2019 04:20 1.39 04:55 1.75 1.54 03:50 1.31 21:10 4.43 2.82 03:50 0.037 07:35 0.151 0.086 0.086 12/17/2019 03:10 1.40 21:45 1.88 1.53 03:50 1.40 08:05 4.22 2.84 03:55 0.038 21:45 0.171 0.086 0.086 12/18/2019 03:45 1.41 12:15 1.79 1.57 03:25 1.47 09:15 4.31 2.72 05:50 0.040 09:20 0.159 0.086 0.086 12/19/2019 03:40 1.42 21:45 1.89 1.66 03:40 1.41 08:10 3.99 2.61 03:40 0.038 08:10 0.150 0.090 0.090 12/20/2019 02:10 1.48 23:50 1.94 1.72 05:35 1.28 11:00 3.75 2.35 05:35 0.038 08:55 0.148 0.085 0.085 0.02 12/21/2019 04:25 1.46 17:20 2.04 1.74 05:40 1.43 11:50 3.59 2.36 05:40 0.042 11:50 0.150 0.087 0.087 12/22/2019 06:10 1.45 13:25 2.07 1.71 05:45 1.24 13:25 3.80 2.28 05:45 0.035 13:25 0.175 0.083 0.083 12/23/2019 05:30 1.45 09:00 2.22 1.69 05:20 1.23 09:00 3.94 2.31 05:20 0.034 09:00 0.201 0.082 0.082 12/24/2019 04:10 1.44 09:20 1.93 1.72 03:20 1.23 10:55 3.80 2.36 03:20 0.038 10:55 0.158 0.085 0.085 12/25/2019 03:40 1.48 09:10 1.96 1.73 05:05 1.06 00:35 3.36 2.17 05:10 0.031 10:45 0.138 0.079 0.079 12/26/2019 04:50 1.52 21:20 1.97 1.74 04:45 1.28 09:30 2.97 2.09 04:45 0.038 09:30 0.125 0.077 0.077 12/27/2019 04:45 1.52 08:45 1.99 1.74 04:15 1.13 21:00 2.89 2.10 04:15 0.034 08:45 0.124 0.077 0.077 12/28/2019 04:25 1.41 11:35 2.01 1.68 01:40 1.70 11:30 3.60 2.37 04:30 0.049 10:30 0.146 0.083 0.083 12/29/2019 02:35 1.50 11:35 2.07 1.69 06:20 1.30 11:25 3.65 2.31 06:20 0.038 11:25 0.166 0.082 0.082 12/30/2019 04:00 1.48 10:00 1.87 1.66 03:30 1.26 08:55 3.85 2.45 04:30 0.038 08:55 0.140 0.084 0.084 12/31/2019 19:35 1.46 09:15 1.73 1.57 03:55 1.23 20:10 4.47 2.72 03:55 0.036 20:10 0.153 0.086 0.086 Daily Tabular Report
Daily Tabular Report For The Period 11/16/2019 00:00 - 03/09/2020 23:59 MIL_1564, Pipe Height: 8.00 in, Silt: 0.00 in
87 1384
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 01/01/2020 05:35 1.41 23:45 1.67 1.53 06:35 1.59 10:20 4.49 2.71 06:35 0.044 10:20 0.146 0.083 0.083 01/02/2020 05:10 1.42 10:55 1.82 1.61 05:10 1.20 23:00 4.02 2.36 05:10 0.032 10:55 0.141 0.078 0.078 01/03/2020 14:15 1.38 09:50 1.90 1.54 03:25 1.25 12:00 4.35 2.78 03:25 0.036 09:50 0.169 0.084 0.084 01/04/2020 14:05 1.29 13:40 1.82 1.44 14:05 1.25 20:35 4.51 3.06 14:05 0.030 13:40 0.164 0.085 0.085 01/05/2020 10:40 1.34 12:10 1.68 1.46 05:55 1.43 11:20 4.72 3.14 05:55 0.037 12:10 0.158 0.089 0.089 01/06/2020 03:40 1.36 08:25 1.70 1.51 05:10 1.42 08:20 4.44 2.72 05:10 0.037 08:25 0.145 0.081 0.081 01/07/2020 04:00 1.37 09:50 1.88 1.53 03:20 1.56 08:15 4.77 2.73 04:00 0.041 08:15 0.169 0.084 0.084 01/08/2020 03:30 1.27 09:30 1.83 1.54 05:45 0.81 10:10 3.97 2.47 05:45 0.019 09:30 0.139 0.078 0.078 01/09/2020 05:30 1.29 07:55 2.00 1.63 05:00 0.65 07:55 3.99 2.43 05:00 0.015 07:55 0.176 0.081 0.081 01/10/2020 04:55 1.34 09:45 1.99 1.69 05:00 0.71 09:50 3.68 1.98 05:00 0.018 09:55 0.148 0.071 0.071 01/11/2020 04:30 1.28 08:35 2.11 1.71 04:20 0.63 10:25 3.59 1.91 04:20 0.015 10:20 0.160 0.071 0.071 01/12/2020 04:50 1.33 10:50 2.12 1.72 04:20 0.67 18:00 3.52 2.07 04:20 0.017 18:00 0.167 0.076 0.076 01/13/2020 05:00 1.32 08:40 2.13 1.61 04:55 0.73 20:55 3.09 1.96 04:55 0.018 08:40 0.148 0.065 0.065 01/14/2020 04:55 1.28 21:50 1.89 1.53 06:15 0.76 20:50 3.87 2.13 06:15 0.019 20:50 0.148 0.066 0.066 01/15/2020 05:15 1.19 08:20 1.93 1.52 05:35 0.58 08:10 4.48 2.08 05:35 0.012 08:10 0.173 0.065 0.065 0.10 01/16/2020 05:35 1.21 10:40 1.89 1.50 05:10 0.77 10:40 4.06 2.36 05:40 0.017 10:40 0.165 0.071 0.071 0.66 01/17/2020 20:05 1.19 07:25 1.59 1.43 04:05 0.75 22:00 4.28 2.40 04:05 0.017 09:50 0.133 0.067 0.067 01/18/2020 04:40 1.21 14:35 1.69 1.44 06:50 1.05 11:30 4.62 2.92 04:45 0.023 14:35 0.150 0.082 0.082 01/19/2020 05:40 1.26 11:50 1.85 1.47 05:30 0.78 11:15 4.38 2.62 05:30 0.018 11:50 0.166 0.076 0.076 01/20/2020 04:40 1.22 10:35 1.80 1.44 04:25 0.96 11:20 4.52 2.64 04:25 0.021 08:45 0.160 0.074 0.074 01/21/2020 03:00 1.23 22:50 1.63 1.44 05:35 0.95 08:05 3.80 2.36 03:00 0.021 08:05 0.114 0.067 0.067 0.01 01/22/2020 04:25 1.21 17:15 1.97 1.52 02:10 0.92 22:40 3.85 2.27 05:10 0.021 21:25 0.112 0.069 0.069 0.09 01/23/2020 04:15 1.22 23:10 1.79 1.48 02:35 0.89 08:15 3.81 2.32 02:35 0.020 20:20 0.131 0.069 0.069 01/24/2020 02:55 1.28 21:45 1.97 1.51 04:10 0.92 21:45 4.82 2.62 04:10 0.023 21:45 0.208 0.079 0.079 01/25/2020 04:50 1.22 22:55 1.91 1.56 04:00 0.85 09:55 3.80 2.44 04:00 0.019 23:00 0.140 0.078 0.078 01/26/2020 03:15 1.31 18:00 1.92 1.61 03:10 1.14 11:15 3.64 2.32 03:10 0.027 22:25 0.137 0.077 0.077 0.16 01/27/2020 04:05 1.27 08:10 1.94 1.60 03:50 0.83 10:10 3.66 2.24 03:50 0.019 08:20 0.147 0.076 0.076 01/28/2020 04:05 1.27 07:30 1.81 1.55 04:00 0.87 21:25 4.07 2.26 04:00 0.020 21:20 0.149 0.072 0.072 0.02 01/29/2020 02:15 1.20 18:30 21.57 1.72 01:25 0.68 08:20 3.89 2.16 01:25 0.017 18:20 0.785 0.074 0.074 01/30/2020 04:00 1.22 07:40 1.81 1.49 03:45 0.58 11:35 3.80 2.16 03:45 0.013 11:35 0.135 0.065 0.065 01/31/2020 04:10 1.21 20:55 1.66 1.46 04:10 0.70 07:40 4.05 2.45 04:10 0.015 07:40 0.133 0.072 0.072 0.01 02/01/2020 03:45 1.21 05:20 1.84 1.53 02:55 0.79 10:10 4.19 2.52 02:55 0.018 10:10 0.154 0.078 0.078 02/02/2020 05:25 1.28 07:50 1.78 1.51 04:35 0.76 12:15 3.90 2.50 04:35 0.018 12:15 0.127 0.076 0.076 02/03/2020 02:50 1.23 08:10 1.68 1.48 05:00 1.02 07:45 3.65 2.32 05:00 0.024 07:50 0.117 0.068 0.068 02/04/2020 03:30 1.22 14:40 2.24 1.54 03:30 0.85 07:45 4.24 2.39 03:30 0.019 07:45 0.148 0.075 0.075 02/05/2020 04:40 1.22 08:20 1.69 1.44 05:50 0.58 08:20 4.00 2.40 05:50 0.013 08:20 0.139 0.068 0.068 02/06/2020 04:05 1.21 07:50 1.56 1.43 03:50 0.84 08:15 4.09 2.39 03:50 0.018 07:50 0.122 0.067 0.067 02/07/2020 05:25 1.22 08:40 1.77 1.44 03:55 0.93 08:20 4.43 2.44 03:55 0.020 08:40 0.148 0.069 0.069 02/08/2020 02:50 1.27 04:30 1.97 1.59 02:55 1.15 08:35 4.21 2.47 02:50 0.027 08:35 0.133 0.079 0.079 02/09/2020 05:20 1.26 12:15 1.79 1.53 05:50 0.84 12:05 3.95 2.36 05:50 0.019 09:10 0.129 0.074 0.074 02/10/2020 04:45 1.17 08:30 1.89 1.51 04:10 0.99 08:30 4.08 2.40 04:10 0.026 08:30 0.166 0.072 0.072 02/11/2020 03:30 1.28 09:00 1.88 1.53 01:15 0.95 20:15 3.84 2.40 04:50 0.023 09:00 0.154 0.074 0.074 02/12/2020 04:00 1.25 08:25 1.82 1.49 04:00 0.76 08:25 4.34 2.48 04:00 0.017 08:25 0.168 0.074 0.074 02/13/2020 01:35 1.23 09:40 1.86 1.54 02:50 1.23 09:40 4.28 2.45 04:35 0.030 09:40 0.170 0.076 0.076 02/14/2020 03:25 1.27 18:45 1.95 1.61 05:35 1.04 08:25 3.50 2.16 05:35 0.024 09:25 0.139 0.072 0.072 02/15/2020 04:25 1.38 20:20 2.12 1.69 05:30 1.06 10:05 2.85 1.80 05:30 0.028 12:00 0.126 0.065 0.065 02/16/2020 04:25 1.26 12:15 2.19 1.69 04:10 0.49 09:50 3.35 1.70 04:10 0.011 09:50 0.149 0.062 0.062 02/17/2020 06:10 1.44 11:55 1.96 1.69 03:45 0.52 09:20 3.53 1.92 03:45 0.015 09:20 0.146 0.069 0.069 02/18/2020 05:05 1.32 08:00 1.89 1.62 04:10 0.89 09:35 3.40 2.13 04:10 0.023 08:00 0.130 0.072 0.072 02/19/2020 04:05 1.28 08:35 2.09 1.67 03:55 0.88 07:40 3.61 2.12 03:55 0.021 08:40 0.160 0.076 0.076 02/20/2020 04:00 1.29 22:00 2.09 1.68 04:30 0.70 22:00 3.12 2.04 04:30 0.019 22:00 0.146 0.073 0.073 02/21/2020 03:35 1.28 19:25 2.10 1.71 03:20 0.76 08:40 3.43 1.94 03:20 0.018 08:40 0.153 0.070 0.070 02/22/2020 04:05 1.31 11:10 2.06 1.69 03:45 0.83 23:55 3.33 2.05 03:45 0.020 23:55 0.140 0.074 0.074 02/23/2020 07:05 1.26 12:05 1.93 1.62 07:05 0.49 11:35 3.79 2.25 07:05 0.011 11:35 0.145 0.077 0.077 02/24/2020 05:35 1.26 21:50 1.88 1.59 05:35 0.84 20:15 3.88 2.16 05:35 0.019 20:15 0.143 0.072 0.072 88 1385
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 02/25/2020 02:40 1.32 08:30 2.00 1.60 05:05 0.88 19:50 4.28 2.21 05:05 0.021 19:50 0.153 0.074 0.074 02/26/2020 04:50 1.26 20:50 1.85 1.57 04:40 0.87 20:50 4.22 2.29 04:40 0.020 20:50 0.167 0.074 0.074 02/27/2020 04:50 1.25 17:45 1.91 1.59 04:20 0.88 14:30 4.09 2.42 04:20 0.020 14:30 0.150 0.079 0.079 02/28/2020 04:10 1.23 22:45 1.90 1.61 04:10 0.72 08:40 3.85 2.08 04:10 0.016 08:40 0.146 0.071 0.071 02/29/2020 04:30 1.29 20:35 1.93 1.63 04:25 0.88 20:45 3.99 2.21 04:30 0.021 20:40 0.147 0.075 0.075 03/01/2020 06:15 1.27 15:55 2.03 1.55 06:15 0.73 15:55 4.35 2.23 06:15 0.017 15:55 0.196 0.070 0.070 03/02/2020 05:30 1.20 07:40 2.04 1.51 04:15 0.93 07:40 4.37 2.50 04:45 0.020 07:40 0.198 0.076 0.076 0.01 03/03/2020 02:00 1.24 22:50 1.71 1.49 05:55 0.92 22:50 4.36 2.48 05:55 0.021 22:50 0.154 0.074 0.074 03/04/2020 04:15 1.19 01:35 2.27 1.55 01:00 1.67 07:40 4.32 2.72 01:00 0.041 07:40 0.145 0.084 0.084 03/05/2020 03:40 1.22 09:15 1.94 1.59 02:55 0.82 21:00 3.98 2.26 03:40 0.018 09:15 0.148 0.075 0.075 03/06/2020 04:00 1.25 08:45 1.93 1.56 03:50 0.71 08:25 4.11 2.24 03:50 0.016 08:25 0.172 0.072 0.072 03/07/2020 03:40 1.23 01:15 1.79 1.57 04:10 0.68 10:30 3.98 2.55 03:40 0.018 10:35 0.136 0.082 0.082 0.58 03/08/2020 05:55 1.30 11:35 1.88 1.53 04:15 0.92 11:00 4.60 2.51 04:15 0.023 11:35 0.173 0.077 0.077 0.02 03/09/2020 03:40 1.22 20:10 1.69 1.43 03:40 0.81 20:10 4.20 2.45 03:40 0.018 20:10 0.146 0.069 0.069 0.11 Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Rain
(in)
Avg
Total

1.60 2.40

9.014

0.078

5.26 Report Summary For The Period 11/16/2019 00:00 - 03/09/2020 23:59 89 1386
Item # 16.

Site Commentary
Site Information
MIL_1790
Pipe Dimensions 28
Silt Level 0.00"
Overview
Site MIL_1790 functioned under normal conditions during the period Saturday, November 16, 2019 to Monday, March 9, 2020 . This site exhibited an observable response to the wet weather events of November 26, 2019 - November 27, 2019, December 7, 2019 - December 8, 2019, and January 16, 2020 - January 17, 2020. Review of the scattergraph shows that free flow conditions were recorded during the study period.

Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted to date and support the relative accuracy of the flow monitor at this location.

This location was installed downstream of sites MIL_0190, MIL_0649 and MIL_1795. A check of balancing shows a net flow of 0.837 MGD between the sites.

Observations
Average flow depth, velocity, and quantity data observed during Saturday, November 16, 2019 to Monday, March 9, 2020 , along with observed minimum and maximum data, are provided in the following table.

Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 10.91 1.97 2.006
Minimum 7.93 1.32 0.852
Maximum 13.37 2.51 3.219
Time of Minimum 3/1/2020 5:45 AM 3/1/2020 5:40 AM 3/1/2020 5:40 AM Time of Maximum 12/23/2019 12:05 PM 11/27/2019 10:55 AM 12/23/2019 12:05 PM Data Quality
Data uptime observed during the Saturday, November 16, 2019 to the Monday, March 9, 2020 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.

Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
90 1387
Item # 16.

Latitude: 37.435578°
Longitude: -121.919933°
Site Sketch Profile View or Photo
Sensor Shot
22431.11.325
Additional Site Info. / Comments:

ADS Project Name:

ADS Project Number:

Milpitas.WWTFM.CA2019-2020
Wireless
Pipe Material
Antenna Location
Communication Information:

Drilled Pavement / Concrete
No
Concrete
Unbolted Normal
Good
Active Drop Connections Air Quality:

Communication Type
Normal
26'' 54''
Manhole Cover Manhole Frame
Pipe Condition:

Manhole Material:

Manhole Diameter (Approx.):

Manhole Depth (Approx. FT): Manhole Configuration
Concrete Good
12'
Manhole Condition:

Upstream 0-5 FT Manhole
Sensors / Devices:

Installation Confirmation:

Manhole Opening Diameter (in)
Silt Type
Hydraulic Comments:
0''
Single

0.25"
Manhole / Pipe Information:

Pressure Sensor Range (psi)
Confirmation Time:

Peak Combo (CS4)
Pipe Size (HxW)

0.0"
Downlooker Physical Offset (in) Measurement Confidence (in) NA
Peak Velocity (fps)
Silt (in)
4:26:00 AM 28.00"x28.00"
Smooth flow with deep depth and moderate velocity
0 - 5 psi
Depth of Flow (Wet DOF) (in) Range (Air DOF) (in)

9.00"
Velocity Sensor Offset (in)

1.82'
Installation Information
Circular
Monitor Series
Monitor Location:

Doppler Standard Ring and Crank
Manhole #
Installation Date:

Pipe Size (H x W)
Topside / Area Photo
Friday, November 15, 2019
Access
Temporary

28.00"x28.00"
Traffic
1790 Residential/Commercial
Map
Installation Type:

Monitoring Location (Sensors):

MIL_1790
TRITON+
System Characteristics
Location Type
Pipe Shape DRIVE.

Milpitas Temp Study 2019-20
Drive Light
Site Access Details:

Site Address /Location:

Site Name
490 N McCarthy Blvd, Milpitas, CA
Flow Monitoring
Site Report
West Outlet
East Inlet
(Sensor Location)
91 1388
Item # 16.
92 1389
Item # 16.
93 1390
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 11/16/2019 04:50 8.41 13:00 12.14 10.48 04:50 1.49 13:05 2.35 1.96 04:50 1.042 13:05 2.693 1.892 1.892 11/17/2019 05:10 8.36 11:25 11.76 10.38 05:00 1.50 11:30 2.26 1.96 05:00 1.043 11:15 2.492 1.863 1.863 11/18/2019 03:55 8.47 10:55 12.74 11.03 04:05 1.54 10:40 2.41 2.05 04:05 1.085 10:45 2.934 2.124 2.124 11/19/2019 04:30 8.64 10:30 12.37 11.03 04:35 1.56 09:20 2.31 2.04 04:30 1.130 10:30 2.717 2.101 2.101 11/20/2019 04:20 8.59 10:20 12.63 10.92 03:55 1.56 10:40 2.36 2.02 03:55 1.124 10:40 2.840 2.058 2.058 11/21/2019 04:45 8.43 09:55 12.75 10.93 04:35 1.56 10:00 2.36 2.04 04:35 1.095 09:55 2.893 2.079 2.079 11/22/2019 04:05 8.48 10:30 12.74 11.03 05:05 1.49 10:40 2.39 2.03 03:55 1.059 10:40 2.911 2.105 2.105 11/23/2019 05:30 8.52 13:00 12.43 10.62 05:00 1.49 11:25 2.33 1.96 04:55 1.057 11:25 2.735 1.929 1.929 11/24/2019 04:50 8.32 11:50 12.42 10.50 04:35 1.42 11:00 2.33 1.95 04:50 0.980 11:55 2.752 1.897 1.897 11/25/2019 04:10 8.35 13:00 12.08 10.80 03:55 1.49 12:15 2.31 2.03 03:55 1.031 12:15 2.618 2.041 2.041 11/26/2019 03:45 8.54 10:00 12.85 11.16 03:40 1.49 10:00 2.46 2.10 03:40 1.064 10:00 3.038 2.202 2.202 0.36 11/27/2019 03:30 9.16 10:35 13.21 11.60 03:30 1.64 10:55 2.51 2.20 03:30 1.285 10:55 3.198 2.420 2.420 0.63 11/28/2019 05:55 9.13 12:15 12.16 10.64 05:55 1.63 10:45 2.29 1.95 05:55 1.274 12:15 2.542 1.896 1.896 11/29/2019 05:05 8.72 14:45 12.30 10.67 05:05 1.53 18:15 2.24 1.94 05:05 1.123 14:45 2.601 1.910 1.910 0.02 11/30/2019 06:50 8.72 13:05 11.84 10.52 06:50 1.53 13:05 2.16 1.91 06:50 1.126 13:05 2.400 1.843 1.843 0.10 12/01/2019 06:55 8.39 16:00 11.80 10.50 06:55 1.45 22:05 2.16 1.89 06:55 1.010 22:10 2.376 1.833 1.833 0.06 12/02/2019 04:40 8.91 09:20 12.88 11.47 04:20 1.52 10:50 2.35 2.06 04:25 1.151 09:30 2.909 2.240 2.240 0.30 12/03/2019 04:25 9.10 10:15 12.85 11.19 04:55 1.57 21:30 2.35 2.04 04:55 1.227 10:30 2.880 2.133 2.133 0.01 12/04/2019 04:25 8.62 10:05 13.23 11.53 04:25 1.51 09:45 2.44 2.14 04:25 1.090 10:00 3.092 2.336 2.336 0.39 12/05/2019 04:35 8.92 09:40 12.68 11.22 04:30 1.62 10:55 2.42 2.09 04:30 1.228 09:40 2.931 2.197 2.197 0.01 12/06/2019 04:25 8.85 09:45 12.34 10.95 03:00 1.52 09:45 2.39 2.05 03:00 1.162 09:45 2.800 2.090 2.090 0.01 12/07/2019 04:00 8.72 19:55 12.74 10.99 03:25 1.55 20:15 2.44 2.07 04:50 1.150 19:55 2.988 2.135 2.135 0.67 12/08/2019 06:20 9.41 11:30 12.40 11.14 06:30 1.56 13:40 2.23 1.97 06:30 1.273 10:50 2.621 2.046 2.046 0.20 12/09/2019 04:45 8.99 09:50 12.37 11.20 03:55 1.51 09:30 2.27 1.99 03:55 1.172 09:45 2.644 2.088 2.088 12/10/2019 04:30 8.80 10:05 12.20 10.96 04:15 1.49 09:20 2.25 1.97 04:15 1.119 09:25 2.587 2.004 2.004 12/11/2019 03:50 8.74 11:20 12.19 10.87 04:05 1.55 09:05 2.27 2.00 04:05 1.148 11:20 2.570 2.010 2.010 0.03 12/12/2019 04:35 8.56 09:55 11.95 10.77 03:05 1.57 11:35 2.32 2.05 04:20 1.161 11:35 2.574 2.040 2.040 0.01 12/13/2019 03:55 8.75 10:10 12.54 10.61 03:55 1.54 10:15 2.37 1.96 03:55 1.137 10:10 2.832 1.916 1.916 0.01 12/14/2019 04:45 8.48 14:40 12.24 10.45 04:45 1.47 12:00 2.34 1.90 04:45 1.040 12:00 2.658 1.827 1.827 0.01 12/15/2019 03:45 8.49 12:15 11.66 10.25 03:45 1.47 12:15 2.13 1.86 03:45 1.043 12:15 2.322 1.732 1.732 0.01 12/16/2019 03:50 8.27 21:35 12.25 10.76 03:50 1.42 22:10 2.32 1.95 03:50 0.971 22:10 2.668 1.951 1.951 0.01 12/17/2019 04:15 8.56 10:55 12.12 10.94 04:15 1.49 10:55 2.20 1.99 04:15 1.068 10:55 2.523 2.024 2.024 0.01 12/18/2019 04:50 8.81 11:10 12.72 11.41 04:50 1.55 10:15 2.28 2.04 04:50 1.159 11:10 2.775 2.192 2.192 0.01 12/19/2019 04:15 8.96 10:40 12.98 11.54 04:00 1.51 11:05 2.36 2.04 04:20 1.155 10:40 2.908 2.238 2.238 12/20/2019 05:35 8.91 10:55 12.85 11.40 05:00 1.51 10:45 2.37 2.04 05:00 1.145 10:50 2.925 2.195 2.195 12/21/2019 04:50 8.76 11:10 12.98 10.98 04:45 1.54 12:00 2.38 2.00 04:45 1.139 11:25 2.970 2.048 2.048 0.01 12/22/2019 04:30 8.77 14:25 12.58 10.86 04:25 1.55 15:00 2.36 1.99 04:25 1.152 15:00 2.816 2.014 2.014 0.41 12/23/2019 04:20 8.98 12:05 13.37 11.47 04:30 1.60 12:05 2.47 2.09 04:30 1.226 12:05 3.219 2.280 2.280 12/24/2019 04:55 9.01 11:45 11.85 10.67 04:55 1.58 12:55 2.19 1.95 04:55 1.212 11:45 2.436 1.910 1.910 0.02 12/25/2019 07:20 8.64 11:55 11.72 10.39 06:15 1.41 11:55 2.18 1.90 06:15 1.037 11:55 2.385 1.805 1.805 0.08 12/26/2019 04:10 8.56 13:45 12.77 11.05 04:15 1.49 12:50 2.39 2.02 04:10 1.071 13:20 2.889 2.101 2.101 12/27/2019 04:35 8.59 11:25 12.92 11.09 05:35 1.55 11:20 2.39 2.02 04:30 1.117 11:25 2.969 2.107 2.107 12/28/2019 06:15 8.43 11:30 12.54 10.69 05:00 1.45 14:55 2.29 1.94 05:00 1.036 11:30 2.729 1.926 1.926 12/29/2019 03:55 8.63 13:00 12.08 10.52 03:45 1.53 11:50 2.26 1.93 03:55 1.117 11:50 2.567 1.865 1.865 0.22 12/30/2019 05:00 8.63 12:05 12.49 11.06 04:10 1.52 12:10 2.30 2.03 04:50 1.112 12:10 2.745 2.100 2.100 12/31/2019 04:55 8.48 12:10 11.96 10.57 04:00 1.49 12:00 2.25 1.95 04:55 1.056 12:00 2.512 1.897 1.897 0.01 Daily Tabular Report
Daily Tabular Report For The Period 11/16/2019 00:00 - 03/09/2020 23:59 MIL_1790, Pipe Height: 28.00 in, Silt: 0.00 in
94 1391
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 01/01/2020 06:40 8.45 11:15 11.44 10.24 06:05 1.50 13:00 2.15 1.90 06:50 1.062 13:40 2.250 1.769 1.769 01/02/2020 04:55 8.64 14:00 12.47 11.10 04:45 1.57 14:05 2.36 2.06 05:00 1.141 14:05 2.803 2.140 2.140 01/03/2020 04:15 8.73 12:50 12.84 11.17 04:10 1.57 12:40 2.42 2.04 04:10 1.158 12:40 2.975 2.147 2.147 01/04/2020 04:40 8.87 11:50 13.21 10.98 04:35 1.61 11:50 2.42 2.03 04:50 1.213 11:50 3.104 2.078 2.078 01/05/2020 04:15 8.67 12:00 11.86 10.68 04:05 1.55 12:15 2.32 1.98 04:15 1.134 12:15 2.581 1.951 1.951 01/06/2020 05:00 8.63 13:45 12.51 11.13 04:50 1.55 10:45 2.35 2.05 04:50 1.128 10:45 2.804 2.142 2.142 01/07/2020 04:25 8.73 09:55 12.56 11.21 04:25 1.59 09:30 2.39 2.06 04:25 1.166 09:30 2.848 2.173 2.173 01/08/2020 05:00 9.14 10:50 12.92 11.34 04:50 1.60 10:40 2.45 2.07 04:50 1.261 10:40 3.044 2.202 2.202 0.02 01/09/2020 04:20 8.55 11:15 13.09 11.17 03:40 1.51 10:45 2.39 2.01 04:20 1.080 11:05 3.005 2.110 2.110 0.18 01/10/2020 04:30 8.79 10:20 12.42 11.06 04:00 1.49 10:05 2.22 1.94 04:20 1.113 10:40 2.629 2.007 2.007 0.02 01/11/2020 04:00 8.51 12:55 12.28 10.62 04:00 1.42 12:50 2.23 1.85 04:00 1.006 12:50 2.596 1.823 1.823 0.01 01/12/2020 04:10 8.51 11:50 11.85 10.50 06:15 1.44 11:50 2.16 1.86 04:10 1.023 11:50 2.406 1.797 1.797 01/13/2020 04:20 8.58 13:55 12.28 10.93 04:25 1.48 22:35 2.28 1.98 04:25 1.066 13:55 2.606 2.016 2.016 0.02 01/14/2020 04:00 8.64 09:50 12.09 10.94 02:15 1.52 10:35 2.34 2.03 04:00 1.125 10:35 2.645 2.077 2.077 0.11 01/15/2020 04:25 8.64 20:10 12.45 11.09 04:25 1.56 11:10 2.36 2.06 04:25 1.128 11:10 2.687 2.129 2.129 0.07 01/16/2020 04:50 8.69 14:25 13.23 11.54 04:50 1.52 12:45 2.32 2.04 04:50 1.114 14:00 2.970 2.243 2.243 0.66 01/17/2020 04:10 9.72 10:35 12.87 11.64 04:55 1.64 09:40 2.28 2.03 04:05 1.407 09:40 2.809 2.226 2.226 01/18/2020 04:40 9.03 12:55 12.88 10.93 04:40 1.52 10:50 2.26 1.89 04:40 1.168 12:45 2.801 1.929 1.929 01/19/2020 06:00 8.73 11:45 11.92 10.57 04:15 1.45 14:35 2.11 1.84 04:15 1.076 11:45 2.359 1.794 1.794 01/20/2020 03:45 8.99 15:25 12.78 11.27 04:10 1.51 12:55 2.25 1.97 03:45 1.170 15:15 2.750 2.096 2.096 01/21/2020 04:55 8.63 10:15 12.24 11.02 04:45 1.44 10:15 2.18 1.93 04:45 1.043 10:15 2.529 1.977 1.977 01/22/2020 04:20 8.72 20:10 12.46 11.16 04:20 1.46 19:55 2.22 1.94 04:20 1.072 20:00 2.633 2.037 2.037 0.03 01/23/2020 04:35 9.06 09:50 12.69 11.30 04:50 1.49 09:25 2.23 1.97 04:50 1.152 09:50 2.687 2.093 2.093 01/24/2020 04:45 9.02 11:30 13.07 11.46 04:45 1.50 12:00 2.29 1.99 04:45 1.158 11:30 2.891 2.159 2.159 01/25/2020 04:35 9.03 15:15 12.37 10.91 04:35 1.51 12:15 2.18 1.88 04:35 1.166 11:30 2.537 1.907 1.907 01/26/2020 05:35 8.87 11:30 12.42 10.90 04:55 1.47 13:40 2.20 1.91 04:55 1.112 11:40 2.599 1.940 1.940 0.16 01/27/2020 04:20 9.13 20:40 12.82 11.47 03:20 1.59 09:40 2.33 2.02 04:35 1.252 09:40 2.855 2.193 2.193 01/28/2020 04:05 9.12 10:30 13.20 11.57 04:00 1.56 11:00 2.34 2.04 04:00 1.217 10:55 2.986 2.245 2.245 0.01 01/29/2020 04:20 9.14 10:15 13.19 11.53 02:55 1.58 09:40 2.37 2.03 04:20 1.246 09:40 3.013 2.212 2.212 01/30/2020 04:30 9.07 21:30 12.86 11.45 03:20 1.56 10:55 2.31 2.02 04:30 1.213 10:55 2.855 2.190 2.190 01/31/2020 04:45 9.04 09:35 13.05 11.54 04:45 1.55 09:55 2.38 2.03 04:45 1.193 09:55 2.995 2.227 2.227 02/01/2020 04:30 8.93 11:50 12.66 10.87 04:35 1.54 10:35 2.28 1.92 04:35 1.173 10:40 2.756 1.936 1.936 02/02/2020 05:50 8.37 13:20 12.05 10.42 05:40 1.39 13:50 2.14 1.83 05:40 0.966 12:30 2.413 1.754 1.754 02/03/2020 04:15 8.60 10:50 12.57 11.06 04:30 1.45 11:10 2.26 1.95 04:00 1.052 11:10 2.703 2.019 2.019 02/04/2020 03:45 8.73 09:50 12.47 11.14 03:50 1.50 09:20 2.25 1.96 03:50 1.102 09:25 2.660 2.050 2.050 02/05/2020 04:15 8.88 10:40 12.68 11.19 04:10 1.50 10:35 2.26 1.99 04:15 1.131 10:40 2.740 2.084 2.084 02/06/2020 04:30 8.67 10:05 12.55 11.15 04:30 1.50 09:50 2.25 1.99 04:30 1.091 10:05 2.693 2.082 2.082 02/07/2020 04:20 8.71 10:50 12.66 11.16 04:05 1.52 11:25 2.28 1.99 04:25 1.120 11:25 2.761 2.083 2.083 02/08/2020 04:35 8.67 16:10 12.60 10.62 03:45 1.51 16:10 2.26 1.90 04:35 1.105 16:10 2.726 1.858 1.858 02/09/2020 05:10 8.41 11:40 11.84 10.41 06:15 1.42 12:05 2.15 1.86 05:10 0.997 12:05 2.372 1.774 1.774 02/10/2020 04:30 8.66 09:45 12.79 11.02 04:25 1.50 10:10 2.34 1.97 04:25 1.090 10:10 2.866 2.025 2.025 02/11/2020 05:00 8.73 09:35 12.83 11.31 04:55 1.49 09:45 2.32 1.99 05:00 1.094 09:45 2.850 2.128 2.128 02/12/2020 05:00 8.79 10:40 12.82 11.40 04:45 1.52 10:00 2.32 2.03 04:55 1.136 10:40 2.859 2.187 2.187 02/13/2020 04:40 8.81 09:35 12.81 11.16 05:20 1.52 09:20 2.33 2.00 05:15 1.142 09:25 2.868 2.089 2.089 02/14/2020 04:40 8.71 11:05 12.67 11.19 04:35 1.52 11:05 2.30 2.00 04:35 1.116 11:05 2.791 2.102 2.102 02/15/2020 04:00 8.50 12:15 12.72 10.65 04:00 1.47 12:20 2.31 1.91 04:00 1.042 12:15 2.818 1.881 1.881 02/16/2020 04:50 8.31 13:10 12.24 10.40 04:40 1.41 13:05 2.18 1.86 04:45 0.969 13:05 2.531 1.774 1.774 02/17/2020 05:15 8.29 11:30 12.82 10.70 06:00 1.40 11:35 2.33 1.90 06:00 0.959 11:35 2.864 1.908 1.908 02/18/2020 04:30 8.31 10:45 12.93 10.89 04:25 1.41 10:15 2.32 1.96 04:25 0.969 10:50 2.855 1.984 1.984 02/19/2020 04:35 8.51 10:45 12.39 10.85 03:05 1.46 10:35 2.29 1.96 03:40 1.045 10:45 2.701 1.987 1.987 02/20/2020 05:00 8.69 11:30 12.43 10.95 04:55 1.50 11:30 2.25 1.97 04:55 1.097 11:30 2.667 2.000 2.000 02/21/2020 04:40 8.56 10:55 12.63 10.77 03:55 1.46 10:50 2.33 1.93 03:55 1.046 10:50 2.795 1.926 1.926 02/22/2020 06:35 8.46 11:30 12.56 10.54 06:50 1.44 11:15 2.29 1.89 06:20 1.016 11:15 2.737 1.836 1.836 02/23/2020 06:45 8.26 20:50 11.96 10.49 06:00 1.39 11:40 2.19 1.88 06:40 0.952 11:30 2.444 1.826 1.826 02/24/2020 03:55 8.42 11:30 12.52 10.87 05:00 1.43 11:30 2.27 1.96 05:00 1.003 11:30 2.718 1.984 1.984 95 1392
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 02/25/2020 05:15 8.41 10:15 12.22 10.84 05:00 1.41 10:20 2.24 1.95 05:05 0.995 10:20 2.584 1.967 1.967 02/26/2020 05:00 8.35 10:55 12.23 10.78 04:50 1.43 10:55 2.22 1.95 05:00 0.993 10:55 2.581 1.942 1.942 02/27/2020 05:20 8.44 09:55 12.33 10.84 04:30 1.46 10:10 2.24 1.95 05:20 1.034 09:55 2.618 1.959 1.959 02/28/2020 04:20 8.37 11:05 12.44 10.75 03:50 1.43 09:55 2.26 1.92 04:35 0.994 11:05 2.664 1.924 1.924 02/29/2020 04:05 8.25 14:10 12.89 10.38 03:50 1.40 14:00 2.33 1.85 03:50 0.957 14:10 2.893 1.760 1.760 03/01/2020 05:45 7.93 12:35 11.38 10.01 05:40 1.32 12:10 2.08 1.77 05:40 0.852 12:10 2.189 1.611 1.611 03/02/2020 04:35 7.99 09:45 12.02 10.50 04:35 1.33 20:50 2.21 1.88 04:35 0.864 20:50 2.488 1.827 1.827 03/03/2020 05:55 8.52 11:00 12.07 10.65 04:50 1.46 11:00 2.27 1.95 05:50 1.050 11:00 2.588 1.914 1.914 03/04/2020 03:45 8.00 09:40 12.22 10.51 03:45 1.40 09:35 2.26 1.93 03:45 0.911 09:35 2.607 1.868 1.868 03/05/2020 04:15 7.99 10:55 11.62 10.43 04:25 1.36 11:00 2.20 1.91 04:25 0.888 11:00 2.379 1.831 1.831 03/06/2020 04:20 7.96 12:35 11.81 10.44 04:10 1.35 12:30 2.21 1.90 04:10 0.877 12:35 2.447 1.827 1.827 03/07/2020 04:30 7.94 12:10 11.94 10.24 03:40 1.34 10:20 2.21 1.86 03:40 0.872 12:05 2.474 1.745 1.745 03/08/2020 05:30 8.22 15:05 12.34 10.08 04:25 1.39 15:00 2.26 1.83 04:25 0.947 15:05 2.655 1.678 1.678 03/09/2020 03:25 8.15 12:20 12.27 10.71 03:15 1.41 12:10 2.25 1.94 03:25 0.942 12:20 2.618 1.930 1.928 Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Rain
(in)
Avg
Total

10.91 1.97
230.723

2.006

4.90 Report Summary For The Period 11/16/2019 00:00 - 03/09/2020 23:59 96 1393
Item # 16.

Site Commentary
Site Information
MIL_1795
Pipe Dimensions 27
Silt Level 1.50"
Overview
Site MIL_1795 functioned under normal conditions during the period Saturday, November 16, 2019 to Monday, March 9, 2020 . This site exhibited an observable response to the wet weather events of November 26, 2019 - November 27, 2019, December 7, 2019 - December 8, 2019, and January 16, 2020 - January 17, 2020. Review of the scattergraph shows that free flow conditions were recorded during the study period.

Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted to date and support the relative accuracy of the flow monitor at this location. Sediment and slow flow conditions render data of lower confidence than typical.

This location was installed upstream of site MIL_1790. (See MIL_1790 Site Commentary for More Details) Observations
Average flow depth, velocity, and quantity data observed during Saturday, November 16, 2019 to Monday, March 9, 2020 , along with observed minimum and maximum data, are provided in the following table.

Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 9.47 0.40 0.299
Minimum 6.32 0.17 0.087
Maximum 12.80 0.54 0.503
Time of Minimum 2/7/2020 3:55 AM 11/22/2019 4:40 AM 2/7/2020 3:55 AM Time of Maximum 1/9/2020 11:40 AM 3/8/2020 1:35 PM 12/30/2019 12:35 PM Data Quality
Data uptime observed during the Saturday, November 16, 2019 to the Monday, March 9, 2020 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.

Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
97 1394
Item # 16.

Latitude: 37.435797°
Longitude: -121.911864°
Site Sketch Profile View or Photo
Sensor Shot
MIL_1795
TRITON+
System Characteristics
Location Type
Pipe Shape DRIVE.

Milpitas Temp Study 2019-20
Drive Medium
Site Access Details:

Site Address /Location:

Site Name
Marylinn Dr and Penitencia St, Milpitas, CA
Flow Monitoring
Site Report
Installation Information
Circular
Monitor Series
Monitor Location:

Doppler Standard Ring and Crank
Manhole #
Installation Date:

Pipe Size (H x W)
Topside / Area Photo
Friday, November 15, 2019
Access
Temporary

27.00"x27.00"
Traffic
1795 Residential/Commercial
Map
Installation Type:

Monitoring Location (Sensors):

Peak Combo (CS4)
Pipe Size (HxW)

3.0"
Downlooker Physical Offset (in) Measurement Confidence (in) NA
Peak Velocity (fps)
Silt (in)
6:23:00 AM 27.00"x27.00"
Smooth flow with deep depth and slow velocity
0 - 5 psi
Depth of Flow (Wet DOF) (in) Range (Air DOF) (in)

9.75"
Velocity Sensor Offset (in)

0.34'
Upstream 0-5 FT Manhole
Sensors / Devices:

Installation Confirmation:

Manhole Opening Diameter (in)
Silt Type
Hydraulic Comments:
0''
Single

0.25"
Manhole / Pipe Information:

Pressure Sensor Range (psi)
Confirmation Time:

Soft / Loose
26'' 54''
Manhole Cover Manhole Frame
Pipe Condition:

Manhole Material:

Manhole Diameter (Approx.):

Manhole Depth (Approx. FT): Manhole Configuration
Concrete Good
8'
Manhole Condition:
22431.11.325
Additional Site Info. / Comments:

ADS Project Name:

ADS Project Number:

Milpitas.WWTFM.CA2019-2020
Wireless
Pipe Material
Antenna Location
Communication Information:

Drilled Pavement / Concrete
No
Concrete
Unbolted Normal
Good
Active Drop Connections Air Quality:

Communication Type
Normal
West Outlet
Easy Inlet
(Sensor Location)
98 1395
Item # 16.
99 1396
Item # 16.
100
1397
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 11/16/2019 04:40 8.99 11:20 10.88 10.01 04:15 0.22 13:40 0.46 0.36 04:15 0.156 13:40 0.412 0.297 0.297 11/17/2019 05:20 8.24 13:15 10.80 9.77 05:50 0.24 11:15 0.46 0.36 05:50 0.148 11:15 0.409 0.287 0.287 11/18/2019 04:20 8.06 08:10 10.91 9.74 04:05 0.24 21:55 0.47 0.37 04:05 0.140 21:55 0.427 0.292 0.292 11/19/2019 03:30 8.46 07:55 10.99 9.73 04:35 0.22 08:50 0.46 0.35 04:35 0.142 08:45 0.408 0.278 0.278 11/20/2019 02:40 8.63 17:40 10.85 9.82 04:10 0.21 07:30 0.46 0.36 04:10 0.140 09:05 0.398 0.286 0.286 11/21/2019 02:40 8.76 20:40 10.77 9.93 02:20 0.24 20:45 0.46 0.36 02:20 0.158 20:45 0.409 0.295 0.295 11/22/2019 04:15 8.41 17:05 11.12 9.87 04:40 0.17 21:50 0.47 0.34 04:40 0.110 21:50 0.410 0.275 0.275 11/23/2019 03:55 8.51 13:20 11.32 9.92 05:25 0.23 13:05 0.47 0.35 05:25 0.147 13:05 0.448 0.287 0.287 11/24/2019 04:45 8.62 12:00 11.14 10.10 02:50 0.21 09:05 0.47 0.36 02:50 0.142 10:45 0.432 0.299 0.299 11/25/2019 03:30 8.47 20:20 10.88 9.94 04:45 0.20 19:40 0.45 0.36 04:45 0.132 19:40 0.405 0.290 0.290 11/26/2019 04:15 8.80 21:05 11.28 10.08 04:10 0.20 07:45 0.47 0.35 04:10 0.135 07:45 0.439 0.292 0.292 0.36 11/27/2019 03:20 9.00 09:50 11.41 10.48 05:05 0.29 12:00 0.48 0.39 03:20 0.208 10:35 0.459 0.337 0.337 0.63 11/28/2019 05:25 9.04 11:05 11.32 10.25 05:30 0.22 14:50 0.47 0.37 05:30 0.155 12:30 0.437 0.313 0.313 11/29/2019 04:05 8.87 10:55 11.05 10.09 04:20 0.23 10:40 0.47 0.38 04:20 0.160 10:40 0.436 0.311 0.311 0.02 11/30/2019 06:00 8.66 11:35 11.32 9.98 03:15 0.21 11:30 0.48 0.36 03:15 0.142 11:30 0.458 0.299 0.299 0.10 12/01/2019 05:50 8.76 15:10 11.11 10.17 06:40 0.21 12:50 0.48 0.37 06:40 0.150 12:50 0.444 0.313 0.313 0.06 12/02/2019 03:35 8.62 08:50 11.52 10.37 04:45 0.24 16:00 0.48 0.38 04:45 0.157 08:20 0.458 0.326 0.326 0.30 12/03/2019 03:10 9.15 19:15 11.56 10.43 04:35 0.27 22:10 0.47 0.38 04:35 0.207 20:10 0.451 0.325 0.325 0.01 12/04/2019 03:10 8.77 08:45 11.59 10.53 03:25 0.26 20:55 0.47 0.38 03:25 0.176 10:35 0.461 0.332 0.332 0.39 12/05/2019 04:00 9.10 21:25 11.42 10.43 05:00 0.23 21:55 0.48 0.36 05:00 0.166 21:55 0.455 0.310 0.310 0.01 12/06/2019 04:10 8.72 07:50 11.41 10.33 03:55 0.21 12:10 0.47 0.37 03:55 0.137 12:10 0.443 0.316 0.316 0.01 12/07/2019 02:50 9.15 18:35 12.16 10.63 05:55 0.26 12:00 0.48 0.38 05:55 0.193 17:45 0.501 0.339 0.339 0.67 12/08/2019 05:50 9.33 10:20 11.56 10.56 23:55 0.28 11:35 0.48 0.38 23:55 0.230 11:35 0.476 0.335 0.335 0.20 12/09/2019 04:10 8.91 06:50 11.26 10.25 04:05 0.21 19:40 0.47 0.37 04:05 0.142 19:40 0.437 0.311 0.311 12/10/2019 04:20 8.95 08:40 11.04 10.30 04:40 0.27 20:25 0.47 0.38 04:40 0.184 20:25 0.432 0.321 0.321 12/11/2019 04:10 9.24 20:25 12.06 10.70 04:50 0.25 20:00 0.46 0.37 04:50 0.181 20:00 0.474 0.334 0.334 0.03 12/12/2019 04:55 9.03 08:20 11.94 10.45 04:05 0.23 22:00 0.47 0.35 04:05 0.164 22:00 0.443 0.305 0.305 0.01 12/13/2019 04:05 8.91 07:00 11.11 10.26 04:20 0.21 07:05 0.45 0.34 04:20 0.142 07:05 0.417 0.290 0.290 0.01 12/14/2019 03:35 9.23 19:35 11.88 10.53 04:30 0.24 14:55 0.46 0.33 04:30 0.175 14:55 0.433 0.291 0.291 0.01 12/15/2019 05:30 9.22 19:20 11.90 10.67 06:10 0.24 11:55 0.48 0.38 05:15 0.175 11:55 0.471 0.337 0.337 0.01 12/16/2019 03:25 9.04 19:15 12.04 10.56 04:30 0.23 20:55 0.47 0.35 04:30 0.168 20:55 0.475 0.306 0.306 0.01 12/17/2019 03:00 9.35 11:25 11.82 10.81 03:20 0.23 21:00 0.47 0.34 03:20 0.171 21:00 0.460 0.310 0.310 0.01 12/18/2019 03:20 9.69 09:05 11.84 10.90 03:30 0.25 08:55 0.48 0.37 03:30 0.198 08:55 0.488 0.340 0.340 0.01 12/19/2019 03:10 9.40 21:45 11.97 10.96 05:30 0.27 16:10 0.47 0.36 05:30 0.216 17:55 0.449 0.335 0.335 12/20/2019 04:00 8.98 19:15 11.49 10.60 04:10 0.23 21:35 0.45 0.34 04:10 0.157 18:55 0.421 0.306 0.306 12/21/2019 05:05 9.18 14:15 11.67 10.37 05:55 0.23 12:45 0.48 0.36 05:40 0.164 14:30 0.462 0.309 0.309 0.01 12/22/2019 06:00 9.09 15:05 12.18 10.70 05:50 0.22 12:45 0.48 0.37 05:50 0.158 12:40 0.474 0.333 0.333 0.41 12/23/2019 05:10 9.93 10:40 11.67 10.90 02:45 0.28 20:25 0.48 0.36 01:20 0.228 20:45 0.457 0.329 0.329 12/24/2019 04:50 9.20 19:15 11.56 10.58 04:55 0.28 13:45 0.48 0.36 04:55 0.199 13:45 0.450 0.319 0.319 0.02 12/25/2019 05:10 9.37 11:55 11.70 10.65 04:20 0.25 19:10 0.47 0.37 04:20 0.187 12:00 0.465 0.333 0.333 0.08 12/26/2019 02:45 9.69 12:55 11.93 10.97 02:50 0.27 14:10 0.48 0.37 02:50 0.212 14:10 0.480 0.339 0.339 12/27/2019 04:55 9.18 11:35 11.70 10.65 04:45 0.24 16:25 0.47 0.35 04:45 0.172 12:25 0.439 0.318 0.318 12/28/2019 05:05 9.03 14:20 11.92 10.57 05:30 0.24 13:50 0.48 0.34 05:30 0.171 13:50 0.470 0.305 0.305 12/29/2019 05:05 9.20 13:25 11.80 10.72 06:55 0.27 13:40 0.48 0.37 05:40 0.196 09:45 0.488 0.337 0.337 0.22 12/30/2019 03:55 9.62 12:50 12.09 11.03 03:10 0.26 15:55 0.48 0.38 03:35 0.203 12:35 0.503 0.357 0.357 12/31/2019 04:10 9.43 19:50 11.96 10.81 06:00 0.26 19:00 0.48 0.36 06:00 0.207 19:00 0.459 0.328 0.328 0.01 Daily Tabular Report
Daily Tabular Report For The Period 11/16/2019 00:00 - 03/09/2020 23:59 MIL_1795, Pipe Height: 27.00 in, Silt: 1.50 in
101
1398
Item # 16.

Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 01/01/2020 06:20 9.37 18:45 12.51 10.90 05:00 0.24 20:00 0.47 0.34 05:00 0.185 18:45 0.491 0.318 0.318 01/02/2020 03:35 9.39 13:40 11.71 10.83 02:25 0.25 19:10 0.47 0.34 04:30 0.188 19:10 0.467 0.314 0.314 01/03/2020 03:00 9.16 19:35 11.60 10.72 05:20 0.24 20:50 0.47 0.35 05:20 0.182 20:50 0.459 0.316 0.316 01/04/2020 04:15 9.03 13:25 11.96 10.76 04:15 0.21 13:05 0.45 0.35 04:15 0.149 13:05 0.464 0.320 0.320 01/05/2020 04:45 9.38 12:20 11.88 10.84 05:15 0.24 09:20 0.47 0.37 05:15 0.178 09:20 0.456 0.341 0.341 01/06/2020 04:00 9.02 21:40 11.80 10.72 04:05 0.22 21:20 0.48 0.34 04:00 0.151 21:20 0.490 0.310 0.310 01/07/2020 04:50 9.35 20:05 11.71 10.90 04:50 0.26 06:15 0.47 0.34 04:50 0.190 06:20 0.435 0.311 0.311 01/08/2020 15:20 7.76 10:15 11.81 10.31 15:25 0.23 14:35 0.47 0.34 15:25 0.129 14:35 0.434 0.292 0.292 0.02 01/09/2020 23:55 8.58 11:40 12.80 9.84 03:00 0.22 10:40 0.45 0.32 04:25 0.150 11:45 0.465 0.258 0.258 0.18 01/10/2020 03:50 7.77 19:20 9.17 8.61 03:35 0.38 19:00 0.52 0.45 03:35 0.212 19:00 0.364 0.296 0.296 0.02 01/11/2020 05:10 7.93 11:00 9.52 8.81 05:10 0.39 12:30 0.52 0.45 05:10 0.223 12:30 0.380 0.308 0.308 0.01 01/12/2020 05:00 7.61 11:00 9.82 8.72 04:50 0.34 15:55 0.52 0.45 04:50 0.181 11:00 0.380 0.299 0.299 01/13/2020 04:15 7.61 19:40 9.24 8.59 04:15 0.37 21:15 0.52 0.45 04:15 0.199 21:15 0.367 0.291 0.291 0.02 01/14/2020 02:15 7.68 20:30 9.62 8.74 03:35 0.35 08:15 0.52 0.45 03:35 0.194 20:30 0.370 0.304 0.304 0.11 01/15/2020 04:55 7.52 20:30 9.69 8.65 04:20 0.36 19:00 0.52 0.45 04:20 0.194 21:20 0.380 0.298 0.298 0.07 01/16/2020 04:00 7.44 13:15 10.33 9.21 04:00 0.36 10:05 0.52 0.45 04:00 0.186 13:15 0.395 0.330 0.330 0.66 01/17/2020 04:50 8.28 09:50 9.95 9.22 04:50 0.40 07:20 0.52 0.47 04:50 0.247 09:50 0.386 0.339 0.339 01/18/2020 05:40 7.83 14:15 9.85 8.91 05:55 0.35 22:25 0.52 0.45 05:55 0.200 14:15 0.382 0.312 0.312 01/19/2020 04:55 7.85 11:55 9.74 8.86 04:55 0.38 22:50 0.52 0.45 04:55 0.217 11:55 0.376 0.310 0.310 01/20/2020 04:40 7.84 15:20 10.01 9.16 04:40 0.38 23:35 0.52 0.46 04:40 0.216 15:20 0.388 0.329 0.329 01/21/2020 03:55 7.87 11:45 10.30 9.14 03:55 0.39 07:25 0.52 0.46 03:55 0.219 11:45 0.395 0.329 0.329 01/22/2020 05:00 8.01 21:15 10.12 9.17 05:00 0.39 07:35 0.52 0.46 05:00 0.229 21:15 0.391 0.331 0.331 0.03 01/23/2020 04:35 7.98 19:45 10.10 9.12 04:35 0.39 23:30 0.52 0.46 04:35 0.227 19:45 0.391 0.328 0.328 01/24/2020 04:50 7.59 17:45 10.20 9.19 04:55 0.36 08:35 0.51 0.45 04:55 0.194 17:45 0.393 0.327 0.327 01/25/2020 05:05 8.00 10:35 10.74 9.09 05:05 0.39 21:20 0.52 0.46 05:05 0.228 10:35 0.438 0.327 0.327 01/26/2020 05:05 7.59 11:15 10.31 9.05 05:10 0.37 09:00 0.52 0.45 05:05 0.197 11:15 0.395 0.319 0.319 0.16 01/27/2020 05:20 7.67 21:20 10.68 9.17 05:05 0.34 08:10 0.48 0.46 05:05 0.184 21:05 0.396 0.328 0.328 01/28/2020 04:30 7.76 10:45 10.40 9.18 04:30 0.38 14:35 0.52 0.46 04:30 0.211 10:45 0.396 0.332 0.332 0.01 01/29/2020 04:05 7.76 10:05 10.69 9.20 04:05 0.38 00:00 0.52 0.46 04:05 0.211 10:20 0.396 0.331 0.331 01/30/2020 04:05 7.59 22:25 10.33 9.14 04:05 0.37 07:35 0.51 0.46 04:05 0.198 22:25 0.395 0.328 0.328 01/31/2020 04:55 7.62 10:40 9.84 8.99 04:55 0.37 22:50 0.51 0.45 04:55 0.200 10:40 0.381 0.318 0.318 02/01/2020 04:40 7.32 11:30 9.64 8.60 04:40 0.35 09:50 0.52 0.44 04:40 0.176 11:30 0.371 0.290 0.290 02/02/2020 04:55 7.41 10:45 9.24 8.40 04:55 0.35 21:30 0.52 0.43 04:55 0.183 21:30 0.366 0.271 0.271 02/03/2020 04:05 7.32 08:55 10.48 8.57 04:05 0.35 13:30 0.52 0.44 04:05 0.176 09:00 0.396 0.289 0.289 02/04/2020 04:35 7.34 13:50 9.45 8.62 06:10 0.34 08:20 0.52 0.45 04:35 0.177 08:20 0.364 0.295 0.295 02/05/2020 05:30 7.48 20:55 9.34 8.56 03:50 0.33 19:15 0.52 0.44 03:50 0.176 09:15 0.368 0.286 0.286 02/06/2020 15:00 6.59 14:50 9.92 8.19 15:00 0.26 11:40 0.52 0.42 15:00 0.114 14:50 0.385 0.258 0.258 02/07/2020 03:55 6.32 11:20 8.99 7.91 03:55 0.22 20:10 0.50 0.39 03:55 0.087 11:20 0.328 0.231 0.231 02/08/2020 04:00 6.57 12:00 8.81 7.88 04:45 0.24 11:00 0.50 0.40 04:00 0.107 12:10 0.337 0.233 0.233 02/09/2020 03:50 6.83 11:20 8.82 7.82 04:35 0.25 21:55 0.48 0.39 04:35 0.117 11:20 0.316 0.224 0.224 02/10/2020 03:20 7.20 09:25 9.88 8.65 01:45 0.29 15:55 0.50 0.43 01:45 0.144 09:25 0.383 0.289 0.289 02/11/2020 03:40 6.95 21:05 9.40 8.58 04:50 0.29 10:05 0.48 0.43 04:50 0.138 09:10 0.353 0.285 0.285 02/12/2020 04:05 7.00 20:10 9.76 8.68 04:15 0.27 16:25 0.51 0.44 04:15 0.127 20:10 0.377 0.294 0.294 02/13/2020 04:00 7.13 11:55 9.57 8.65 03:35 0.29 21:00 0.51 0.44 03:35 0.142 21:00 0.376 0.293 0.293 02/14/2020 04:00 7.12 11:25 9.65 8.74 03:50 0.28 22:55 0.51 0.44 03:50 0.138 19:20 0.372 0.299 0.299 02/15/2020 05:30 7.13 12:20 9.92 8.50 06:15 0.30 13:55 0.48 0.43 06:15 0.150 12:20 0.385 0.280 0.280 02/16/2020 04:45 6.74 13:10 9.27 8.18 04:45 0.24 19:55 0.49 0.41 04:45 0.107 13:10 0.344 0.255 0.255 02/17/2020 04:50 6.75 13:25 9.99 8.37 03:00 0.27 10:45 0.51 0.41 04:50 0.122 13:25 0.387 0.267 0.267 02/18/2020 03:50 6.85 11:00 9.50 8.45 04:55 0.27 08:30 0.50 0.43 05:25 0.123 11:00 0.358 0.277 0.277 02/19/2020 04:30 7.06 12:10 9.75 8.61 04:30 0.31 13:25 0.51 0.44 04:30 0.150 13:25 0.383 0.289 0.289 02/20/2020 03:30 7.30 11:20 9.64 8.72 04:20 0.31 21:45 0.51 0.45 04:20 0.160 11:20 0.371 0.299 0.299 02/21/2020 04:20 7.10 11:00 9.56 8.48 03:50 0.29 11:00 0.48 0.44 03:50 0.145 11:00 0.367 0.281 0.281 02/22/2020 05:40 6.88 12:05 9.91 8.34 03:40 0.28 12:35 0.48 0.42 05:45 0.135 12:05 0.384 0.267 0.267 02/23/2020 05:35 6.85 20:20 9.71 8.32 03:00 0.28 17:55 0.50 0.42 05:15 0.129 20:20 0.375 0.265 0.265 02/24/2020 04:30 6.91 11:40 9.34 8.37 01:50 0.29 14:50 0.51 0.42 03:50 0.137 14:50 0.360 0.271 0.271 102