City of Milpitas, CA
Tyler Technologies, Inc. Page | 55
2 Human
Resource
Management
●Payroll w/Employee Access
●HR & Talent Management
●Time and Attendance
●Employee Expense Reimbursement
July 2024 January
2026
11.2Data & Insights Project Plan
Data & Insights Project Plan
Week
1 2 3 4 5 6 7 8 9 10 11 12
Initiate and Plan
Assess and Define
Prepare Solution
Production Readiness
Production
Close
11.3Intentionally left blank.
PURCHASING DIVISION
RFP
FOR:
Enterprise Resource Services
RFP
NO:
23 -
078
DUE DATE:
July 13, 2023
BUYER:
R. Yamashita
Collaborative Solutions
Tyler Technologies
Avaap.com
Cayenta
Cogsdale
*
Oracle
1 2
3 4
5 6
Round 2 Scoring
68.8 81
61.2 59.4
52 X
Round 3 Scoring
65 82.25
x
x
x
X
* Disqualified
–
Minimum Criteria was
not met
**BID AWARD
NOTICE
**
City Council Date:
December 5, 2023
AWARD
TO:
Tyler Technologies
CODE KEY: INA = Information Not Available NS = Not Stated NB = No Bid DY = Days WK = Weeks HR = Hours
CITY OF MILPITAS
AGENDA REPORT
(AR)
Item Title: Report on Bids and Adopt a Resolution Authorizing the City Manager to Award the Construction Contract to PCD in the Amount of $835,768.08 for the Council Chamber AV System Replacement Project (Staff Contact: Daniel Nam, Information Technology Director, 408-586-2712)
Category: Consent Calendar-Leadership and Support Services Meeting Date: 12/12/2023
Recommendation: (1) Receive report on bids and adopt a resolution authorizing the City Manager to award a construction contract to the lowest responsible and responsive bidder, PCD, in the amount of $835,768.08 for the Council Chamber AV System Replacement Project, including $752,559.08 for the Council Chamber AV replacement and $83,209.00 for the Committee Conference Room AV replacement; and (2) Authorize the City Manager to negotiate and execute contract change order(s) in an aggregate amount not to exceed $79,231.92 for the Council Chamber AV System Replacement Project.
BACKGROUND:
The Council Chambers Audio Visual (AV) system is over 11 years old and past the end of its useful life.
Several technology components of the AV system have failed in the last two years and have been replaced by temporary solutions. Since the time the AV system was installed, not only have some of the technology components become obsolete, but the City has also transitioned to hosting hybrid meetings, which requires complex interfaces with the virtual meeting platform and streaming services. This has created system glitches on several occasions, resulting in interruptions to public meetings.
In addition to the AV system in the Council Chambers, the AV system in the Committee Conference room also requires replacement to modernize the technology and support the Sub-Committee and Commission meetings that are held in this room.
ANALYSIS:
On October 26, 2023, the City issued an Invitation for Bid (IFB) 24-030 for the Council Chambers AV Replacement Project. The IFB also included the Committee Conference Room AV Replacement as Add Alternate No.1 and one year of maintenance support for both the Council Chambers and the Committee Conference Room as Add Alternate No. 2. The IFB was publicly noticed in accordance with the City’s municipal code and advertised on the City’s website. Email notifications were sent to companies registered with the City via OpenGov Procurement, the City’s eProcurement system. A mandatory pre-bid conference was held at Milpitas City Hall on November 13, 2023, with five (5) contractors in attendance. Three (3) bids were received at the bid close on November 29, 2023, with the base bid ranging from $743,761.88 to $857,735.73.
# Contractor Base Bid Add Alt. No. 1 Add Alt. No. 2
1 Coda Technology Group $857,735.73 $96,214.87 $14,250.00 2 EIDIM Group, Inc.
(dba EIDIM AV Technology)
$854,847.60 $116,461.27 $32,185.71
3 PCD $743,761.88 $83,209.00 $8,797.20
After reviewing the required bid documents, PCD was the lowest responsible bidder submitting a responsive bid. The bid submitted was within the City’s estimate for these services. Bids for Add Alternates 1 and 2 were also submitted and deemed reasonable for the scope of work.
Staff is requesting authority to execute change order contingencies related to this project for the not-to-exceed amount of $79,231.92 (9.5% of base bid). This authority will allow for more effective administration and timely completion of the work outlined in this project caused by the unexpected discovery of other issues that may arise during the project.
The project bids are within the available project budget. Staff recommends the City Council award the contract for the Project to PCD for the base bid amount of $743,761.88 and two Add Alternates for a total contract amount of $835,768.08 and authorize the City Manager to execute contract change orders in an aggregate amount not-to-exceed $79,231.92.
POLICY ALTERNATIVE(S):
Alternative 1: Direct City staff to reject all bids and not proceed with the project.
Pros: The City would be able to use the $835,768.08 for other projects.
Cons: Rejecting all bids and deferring the replacement of the AV systems in the Council Chambers and the Committee Conference Room will result in continued system failures and interruptions to public meetings.
Reason for Not Recommending: Not proceeding with the project would result in continued system failures and interruptions to public meetings. It would also result in expensive temporary fixes, which would divert staff from other high-priority projects.
FISCAL IMPACT:
There are sufficient funds available in Capital Improvement Project No. 3498 – Council Chamber AV Replacement Project for the base scope and Add Alternate No. 2, and in Capital Improvement Project No. 3427 – Technology Projects for Add Alternate 1. As of December 5, 2023, the balance in CIP No. 3498 is $800,000 and CIP No. 3427 is $388,875. Funding source for CIP No. 3498 is General Fund Facilities Replacement Reserve and funding source for CIP 3427 is General Government CIP and Permit Automation Fund.
California Environmental Quality Act (CEQA):
The project entails replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced and is exempt from CEQA pursuant to Cal. Code Regs., tit. 14, § 15302.
RECOMMENDATION:
(1) Receive report on bids and adopt a resolution authorizing the City Manager to award a construction contract to the lowest responsible and responsive bidder, PCD, in the amount of $835,768.08, including $752,559.08 for the Council Chamber AV Replacement and $83,209.00 for the Committee Conference Room AV Replacement; and
(2) Authorize the City Manager to negotiate and execute contract change order(s) in an aggregate amount not to exceed $79,231.92 for the Council Chamber AV System Replacement Project.
Attachment(s):
(a) Resolution
(b)Agreement
(c)Final Bid Tab
38077.00180\29080232.10 C2
CITY OF MILPITAS
MILPITAS, CALIFORNIA
CONTRACT DOCUMENTS AND SPECIFICATIONS FOR
24-030 COUNCIL CHAMBER AV
SYSTEM REPLACEMENT
Recommended for Bidding: ______________________________________ Daniel Nam, Director of Information Technology
Approved for Bidding: _____________________________________ Matt Cano, Deputy City Manager/Interim City Engineer
Digitally signed by Daniel Nam
DN: C=US, OU=IT, O=City of Milpitas, CN
=Daniel Nam, [email protected]
Reason: I am approving this document
Location: Milpitas, CA
Date: 2023.10.26 09:50:28-07'00'
Foxit PDF Editor Version: 13.0.0
Daniel
Nam
38077.00180\29080232.10 C2
TABLE OF CONTENTS
Page
-i-
00 11 16 – NOTICE INVITING BIDS
00 11 16 – NOTICE INVITING BIDS ........................................................................................... 1
00 21 13 – INSTRUCTIONS TO BIDDERS ................................................................................. 4
00 41 43 – BID FORMS .......................................................................................................... ... 13
00 52 13 – CONTRACT ........................................................................................................... .. 39
00 61 13 – BOND FORMS ......................................................................................................... 44 00 72 13 – GENERAL CONDITIONS ........................................................................................ 56
00 73 13 – SPECIAL CONDITIONS ........................................................................................ 113
01 00 00 – GENERAL REQUIREMENTS ................................................................................ 116
EXHIBIT “A” CHANGE ORDER FORM ................................................................................... A-1 EXHIBIT "B" PHASE #1 AND PHASE #2 TIME SCHEDULE ……………………………………B-1
38077.00180\29080232.10 C2
-1-
00 11 16 – NOTICE INVITING BIDS
00 11 16 – NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN that the City Council of
the City of Milpitas (“City”) invites and will
receive sealed Bids up to
but not later than 2:00 p.m. on Wednesday, November 29, 2023 via
procurement.opengov.com
, the City’s eProcurement website, for the furnishing to City of all labor, equipment, materials, tools, services, transportation, permits, utilities, and all other items necessary for
Council Chamber AV System Replacement
(the “Project”). At said time, Bids
will be publicly opened and read aloud at the City Office. Bids received after said time shall be returned unopened. Bids shall be valid for a period of 90 calendar days after the Bid opening date.
Bids must be submitted on the City’s Bid Forms. Bidders may obtain a copy of the Contract Documents from
procurement.opengov.com
and no other method of obtaining documents may
be accepted. To the extent required by section 20103.7 of the Public Contract Code, upon request from a contractor plan room service, the City shall provide an electronic copy of the Contract Documents at no charge to the contractor plan room.
It is the responsibility of each prospective bi
dder to download and print all Bid Documents for
review and to verify the completeness of Bid Documents before submitting a bid. Any Addenda will be posted on
procurement.opengov.com
. It is the responsibility of each prospective bidder
to check
procurement.opengov.com
on a daily basis through the close of bids for any applicable addenda or updates. The City does not assume any liability or responsibility based on any defective or incomplete copying, excerpting, scanning, faxing, downloading or printing of the Bid Documents. Information on
procurement.opengov.com
may change without notice to prospective
bidders. The Contract Documents shall supers
ede any information posted or transmitted by
procurement.opengov.com
.
Each Bid shall be accompanied by a Bid Bond secured from a surety company satisfactory to the City Council, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to City of Milpitas as bid security. The bid security shall be provided as a guarantee that within five (5) working days after the City provides the successful bidder the Notice of Award, the successful Bidder will enter into a contract and provide the necessary bonds and certificates of insurance. The bid security will be declared forfeited if the successful Bidder fails to comply within said time. No interest will be paid on funds deposited with City.
A
MANDATORY
Pre-Bid Conference is scheduled for
Monday November 13, 2023 at 2:00
p..m.
to review the Project's existing conditions at Milpitas City Hall Council Chambers, 455 E.
Calaveras Blvd, Milpitas, CA 95035. Representatives of the City and consulting engineers, if any, will be present. Bidders need only to attend one Pre-Bid Conference. Questions asked by Bidders at the Pre-Bid Conference not specifically addressed within the Contract Documents shall be answered in writing, and issued as an Addendum. Bids will not be accepted from any bidder who did not attend one of the mandatory Pre-Bid Conferences.
The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California
bonding requirements, as defined in California Code
of Civil Procedure Section 995.120, and that is a California admitted surety insurer.
38077.00180\29080232.10 C2
-2-
00 11 16 – NOTICE INVITING BIDS
Pursuant to Section 22300 of the Public Contract Code of the State of California, the successful Bidder may substitute certain securities for funds withheld by City to ensure its performance under the contract.
Pursuant to Labor Code Section 1773, City has obtained the prevailing rate of per diem wages and the prevailing wage rate for holiday and overtime work applicable in Santa Clara County from the Director of the Department of Industria
l Relations for each craft, classification, or type
of worker needed to execute this contract. A copy of these prevailing wage rates may be obtained via the internet at: www.dir.ca.gov/dlsr/
In addition, a copy of the prevailing rate of per diem wages is available at the City’s Finance Department and shall be made available to interested parties upon request. The successful bidder shall post a copy of the prevailing wage rates at each job site. It shall be mandatory upon the Bidder to whom the Contract is awarded, and upon any subcontractors, to comply with all Labor Code provisions, which include but are not limited to the payment of not less than the said specified prevailing wage rates to all workers employed by them in the execution of the Contract, employment of apprentices, hours of labor and debarment of contractors and subcontractors.
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No Bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded a contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.
This Project is subject to compliance monito
ring and enforcement by the Department of
Industrial Relations. In bidding on this Project, it shall be the Bidder’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this contract and applicable law in its Bid.
Unless otherwise provided in the Instructions for Bidders, each Bidder shall be a licensed contractor pursuant to sections 7000 et seq. of the Business and Professions Code in the following classification(s) throughout the time it submits its Bid and for the duration of the contract: C7 and/or C10.
Substitution requests shall be made within 35 calendar days after the award of the contract.
Pursuant to Public Contract Code Section 3400(b), the City may make findings designating that certain additional materials, methods or services by specific brand or trade name other than those listed in the Standard Specifications be used for the Project. Such findings, if any, as well as the materials, methods or services and their specific brand or trade names that must be used for the Project may be found in the Special Conditions.
Pursuant to Public Contract Code section 7201, the City has made a determination that the project described herein is substantially complex, and therefore a retention of 5% will be withheld from payment until after the work is complete.
38077.00180\29080232.10 C2
-3-
00 11 16 – NOTICE INVITING BIDS
City shall award the contract for the Project to the lowest responsive, responsible Bidder as determined by the City from the BASE BID PLUS
SPECIFIED ALTERNATES. City reserves the
right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.
For further information, contact Rosanne Yamashita, Buyer, at City of Milpitas City Hall, 455 E.
Calaveras Bouelvard, Milpitas, CA 95035 or (408) 586-3162.
END OF NOTICE INVITING BIDS
38077.00180\29080232.10 C2
-4-
00 21 13 – INSTRUCTIONS TO BIDDERS
00 21 13 – INSTRUCTIONS TO BIDDERS
1. SECURING DOCUMENTS
Bids must be submitted to the City on the Bid Forms which are a part of the Bid Package for the Project. Bid and Contract Documents may be obtained from the City as specified in the Notice Inviting Bids. Prospective bidders are encouraged to telephone in advance to determine the availability of Contract Documents. Any charge for the Contract Documents is stated in the Notice Inviting Bids.
The City may also make the Contract Documents available for review at one or more plan rooms, as indicated in the Notice Inviting Bids. Please Note: Prospective Bidders who choose to review the Contract Documents at a plan room must contact the City via Prints Charles Reprographics to obtain the required Contract Documents if they decide to submit a bid for the Project.
Addenda, if any, issued during the bid period will be posted on procurement.opengov.com
.
Failure to acknowledge addenda may make a bid nonresponsive and not eligible for award of the contract.
2. EXAMINATION OF SITE AND CONTRACT DOCUMENTS
At its own expense and prior to submitting its Bid, each Bidder shall visit the site of the proposed work and fully acquaint itself with the conditions relating to the construction and labor required so that the Bidder may fully understand the work, including but not limited to difficulties and restrictions attending the execution of the work under the contract. Each Bidder shall carefully examine the Drawings, and shall read the Specifications, Contract, and all other documents referenced herein. Each Bidder shall also determine the local conditions which may in any way affect the performance of the work, including local tax structure, contractors’ licensing requirements, availability of required insurance, the prevailing wages and other relevant cost factors, shall familiarize itself with all federal, state and local laws, ordinances, rules, regulations and codes affecting the performance of the work, including the cost of permits and licenses required for the work, and shall make such surveys and investigations, including investigations of subsurface or latent physical conditions at the site or where work is to be performed as may be required. Bidders are responsible for consulting the standards referenced in the Contract.
The failure or omission of any Bidder to rece
ive or examine any contract documents, forms,
instruments, addenda, or other documents, or to visit the site and acquaint itself with conditions there existing shall in no way relieve any Bidder from any obligation with respect to its Bid or to the contract and no relief for error or omission will be given except as required under State law.
The submission of a Bid shall be taken as conclusive evidence of compliance with this Article.
Storm, surface, nuisance, or other waters may be encountered at various times during construction of the Project. Federal and State laws require the City and its contractors to appropriately manage such waters pursuant to the requirements of California State Water Resources Control Board Order Number 2009-0009-DWQ and any amendment or renewal thereof, the Federal Clean Water Act, and the California Porter Cologne Water Quality Control Act. By submitting a Bid, each Bidder acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising therefrom.
38077.00180\29080232.10 C2
-5-
00 21 13 – INSTRUCTIONS TO BIDDERS
3. INTERPRETATION OF DRAWINGS AND DOCUMENTS
Prospective Bidders unclear as to the true meaning of any part of the Drawings, Specifications or other proposed contract documents may submit to the Engineer of the City a written request for interpretation. The prospective Bidder submitting the request is responsible for prompt delivery. Interpretation of the Drawings, Specifications or other proposed contract documents will be made only by a written addendum duly i
ssued and a copy of such addenda will be mailed
or delivered to each prospective Bidder who has purchased a set of Drawings and Specifications. The City will not be responsible for any other explanation or interpretations of the proposed documents. If a Prospective Bidders becomes aware of any errors or omissions in any part of the Contract Documents, it is th
e obligation of the Prospective Bidder to promptly
bring it to the attention of the City.
4. INSPECTION OF SITE; PRE-BID CONFERENCE
Each prospective bidder is responsible for fully acquainting itself with the conditions of the Project Site (which may include more than one site), as well as those relating to the construction and labor of the Project, to fully understand the facilities, difficulties and restrictions which may impact the cost or effort required to complete the Project. To this end, a Pre-Bid Meeting and Site Walk will be held on the date(s) and time(s) indicated in the Notice Inviting Bids.
5. ADDENDA
The City reserves the right to revise the Contract Documents prior to the Bid opening date.
Revisions, if any, shall be made by written Addenda. All Addenda issued by the City shall be included in the Bid and made part of the Contract Documents. Pursuant to Public Contract Code Section 4104.5, if the City issues an Addendum which includes material changes to the Project less than 72 hours prior to the deadline for submission of Bids, the City will extend the deadline for submission of Bids. The City may determine, in its sole discretion, whether an Addendum warrants postponement of the Bid submission date. Each prospective Bidder shall provide City a name, address, email address,
and facsimile number to which Addenda may be
sent, as well as a telephone number by which
the City can contact the Bidder. Any Addenda will
be posted on
procurement.opengov.com
. Please Note: Bidders are responsible for ensuring
that they have received any and all Addenda. To this end, each Bidder should contact Rosanne Yamashita, Buyer, at City of Milpitas City Hall, 455 E. Calaveras Bouelvard, Milpitas, CA 95035 or (408) 586-3162 to verify that it has received all Addenda issued, if any, prior to the Bid opening. The Bidder shall indicate the Addenda received prior to bidding in the space provided in the Bid Form. Failure to indicate all Addenda may be sufficient cause for rejecting the Bid.
6. ALTERNATE BIDS
If alternate bid items are called for in the Contract Documents, the time required for completion of the alternate bid items has already been factored into the Contract duration and no additional Contract time will be awarded for any of the alternate bid items. The City may elect to include one or more of the alternate bid items, or to otherwise remove certain work from the Project scope of work. Accordingly, each bidder must ensure that each bid item contains a proportionate share of profit, overhead, and other costs or expenses which will be incurred by the bidder.
38077.00180\29080232.10 C2
-6-
00 21 13 – INSTRUCTIONS TO BIDDERS
7. COMPLETION OF BID FORMS
Bids shall only be prepared using copies of the Bid Forms which are included in the Contract Documents. The use of substitute Bid Forms other than clear and correct photocopies of those provided by the City will not be permitted. Bi
ds shall be executed by an authorized signatory as
described in these Instructions to Bidders. In addition, Bidders shall fill in all blank spaces (including inserting “N/A” where applicable), and initial all interlineations, alterations, or erasures to the Bid Forms. Bidders shall neither delete, modify, nor supplement the printed matter on the Bid Forms nor make substitutions thereon. USE OF BLACK OR BLUE INK, INDELIBLE PENCIL, OR A TYPEWRITER IS REQUIRED. Deviations in the Bid Forms may result in the Bid being deemed non-responsive.
8. MODIFICATIONS OF BIDS
Each Bidder shall submit its Bid in strict conformity with the requirements of the Contract Documents. Unauthorized additions, modifications,
revisions, conditions, limitations, exclusions
or provisions attached to a Bid may render it non-responsive and may cause its rejection.
Bidders shall not delete, modify, or supplement the printed matter on the Bid Forms, or make substitutions thereon. Oral, telephonic and electronic modifications will not be considered.
9. SUBCONTRACTORS
Bidder shall set forth the name, address of the place of business, and contractor license number of each subcontractor who will perform work, labor, furnish materials or render services to the bidder on said contract and each subcontractor licensed by the State of California who, under subcontract to bidder, specially fabricates and installs a portion of the Work described in the Drawings and Specifications in an amount in excess of one half of one percent (0.5%) of the total bid price, and shall indicate the portion of the work to be done by such subcontractor in accordance with Public Contract Code Section 4104.
The successful bidder will be required to self-perform at least 80% of the work.
10. LICENSING REQUIREMENTS
Pursuant to Business and Professions Code Section 7028.15 and Public Contract Code Section 3300, all bidders must possess proper licenses for performance of this Contract.
Subcontractors must possess the appropriate licenses for each specialty subcontracted.
Pursuant to Business and Professions Code Section 7028.5, the City shall consider any bid submitted by a contractor not currently licensed in accordance with state law and pursuant to the requirements found in the Contract Documents to be nonresponsive, and the City shall reject the Bid. The City shall have the right to request, and Bidders shall provide within ten (10) calendar days, evidence satisfactory to the City of all valid license(s) currently held by that Bidder and each of the Bidder’s subcontractors, before awarding the Contract.
Notwithstanding anything contained herein, if the Work involves federal funds, the Contractor shall be properly licensed by the time the Contract is awarded, pursuant to the provisions of Public Contract Code section 20103.5.
38077.00180\29080232.10 C2
-7-
00 21 13 – INSTRUCTIONS TO BIDDERS
11. BID GUARANTEE (BOND)
Each bid shall be accompanied by: (a) cash; (b) a certified or cashier’s check made payable to City of Milpitas; or (c) a Bid Bond secured from a surety company satisfactory to the City Council, the amount of which shall not be less than ten percent (10%) of the Total Bid Price, made payable to City of Milpitas as bid security. Personal sureties and unregistered surety companies are unacceptable. The surety insurer shall be California admitted surety insurer, as defined in Code of Civil Procedure Section 995.120. The bid security shall be provided as a guarantee that within ten (10) working days after the City provides the successful bidder the Notice of Award, the successful bidder will enter into a contract and provide the necessary bonds and certificates of insurance. The bid security will be declared forfeited if the successful bidder fails to comply within said time, and City may enter into a contract with the next lowest responsive responsible bidder, or may call for new bids. No interest shall be paid on funds deposited with the City
.
City will return the security accompanying the bids of all unsuccessful bidders no later than 60 calendar days after award of the contract.
12. IRAN CONTRACTING ACT OF 2010
In accordance with Public Contract Code Section 2200
et seq
., the City requires that any person
that submits a bid or proposal or otherwise proposes to enter into or renew a contract with the City with respect to goods or services of one million dollars ($1,000,000) or more, certify at the time the bid is submitted or the contract is renewed, that the person is not identified on a list created pursuant to subdivision (b) of Public Contract Code Section 2203 as a person engaging in investment activities in Iran described in subdivision (a) of Public Contract Code Section 2202.5, or as a person described in subdivision (b) of Public Contract Code Section 2202.5, as applicable.
The form of such Iran Contracting Certificate is included with the bid package and must be signed and dated under penalty of perjury.
13. NONCOLLUSION DECLARATION
Bidders on all public works contracts are required to submit a declaration of noncollusion with their bid. This form is included with the bid package and must be signed and dated under penalty of perjury.
14. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded a contract, the bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project. To this end, Bidder shall sign and submit with its Bid the Public Works Contractor Registration Certification on the form provided, attesting to the facts contained therein. Failure to submit th
is form may render the bid non-responsive. In
addition, each Bidder shall provide the registration number for each listed subcontractor in the space provided in the Designation of Subcontractors form.
38077.00180\29080232.10 C2
-8-
00 21 13 – INSTRUCTIONS TO BIDDERS
15. WAGE THEFT CERTIFICATION
Bidders on public works contracts are required to
submit a certification disclosing whether the
Bidder or any of its proposed subcontractors has been found by a final court order or administrative action of an investigatory government agency to have violated federal, state or local wage and hour laws, including but not limited to the federal Fair Labor Standards Act, the California Labor Code and the Milpitas Minimum Wage Ordinance, within the past five (5) years from the bid submission deadline.
16. BIDDER INFORMATION AND EXPERIENCE FORM
Each Bidder shall complete the questionnaire provided herein and shall submit the questionnaire along with its Bid. Failure to provide all information requested within the questionnaire along with the Bid may cause the bid to be rejected as non-responsive. The City reserves the right to reject any Bid if an investigation of the information submitted does not satisfy the Engineer that the Bidder is qualified to properly carry out the terms of the contract.
17. WORKERS' COMPENSATION CERTIFICATION
In accordance with the provisions of Labor Code Section 3700, Contractor shall secure the payment of compensation to its employees. Contractor shall sign and file with the City the following certificate prior to performing the work under this Contract:
I am aware of the provisions of Section 3700 of the Labor Code, which require every employer to be insured against liabi
lity for workers’ compensation or to
undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.
The form of such Workers' Compensation Certificate is included as part of this document.
18. SIGNING OF BIDS
All Bids submitted shall be executed by the Bidder or its authorized representative. Bidders may be asked to provide evidence in the form of an authenticated resolution of its Board of Directors or a Power of Attorney evidencing the capacity of the person signing the Bid to bind the Bidder to each Bid and to any Contract arising therefrom.
If a Bidder is a joint venture or partnership, it may be asked to submit an authenticated Power of Attorney executed by each joint venturer or partner appointing and designating one of the joint venturers or partners as a management sponsor to
execute the Bid on behalf of Bidder. Only
that joint venturer or partner shall execute the Bid. The Power of Attorney shall also: (1) authorize that particular joint venturer or partner to act for and bind Bidder in all matters relating to the Bid; and (2) provide that each venturer or partner shall be jointly and severally liable for any and all of the duties and obligations of Bidder assumed under the Bid and under any Contract arising therefrom. The Bid shall be executed by the designated joint venturer or partner on behalf of the joint venture or partnership in its legal name.
19. SUBMISSION OF SEALED BIDS
Once the bid and supporting documents have been completed and signed as set forth herein, they shall be electronically uploaded, along with the bid guarantee and other required materials,
38077.00180\29080232.10 C2
-9-
00 21 13 – INSTRUCTIONS TO BIDDERS
to
procurement.opengov.com
before the time and day set for the receipt of bids. No oral, paper, or telephonic bids will be considered. No forms transmitted via e-mail, facsimile, or any other non-approved electronic means will be considered unles
s specifically authorized by the city as
provided herein. Bids received after the time and day set for the receipt of bids shall be returned to the bidder unopened.
Only where expressly permitted in the notice inviting bids may bidders submit their bids via electronic transmission pursuant to public contract code sections 1600 and 1601. Any acceptable method(s) of electronic transmission shall be stated in the notice inviting bids. City may reject any bid not strictly complying with city’s designated methods for delivery.
20. OPENING OF BIDS
At the time and place set for the opening and reading of bids, or any time thereafter, each and every bid received prior to the time and day se
t for the receipt of bids will be publicly opened
and read. The City will leave unopened any Bid received after the specified date and time, and any such unopened Bid will be returned to the bidder. It is the bidder’s sole responsibility to ensure that its Bid is received as specified. Bids may be submitted earlier than the date(s) and time(s) indicated.
The public reading of each bid will include the following information:
A. The name and business location of the bidder.
B. The nature and amount of the bid security furnished by bidder.
C. The bid amount.
Bidders or their representatives and other interested persons may be present at the opening of the bids. The City may, in its sole discretion, elect to postpone the opening of the submitted Bids. The City reserves the right to reject any or all Bids and to waive any informality or irregularity in any Bid.
21. WITHDRAWAL OF BID
Any bid may be withdrawn either personally or by written request, incurring no penalty, at any time prior to the scheduled closing time for receipt of bids. Requests to withdraw bids shall be worded so as not to reveal the amount of the original bid. Withdrawn bids may be resubmitted until the time and day set for the receipt of bids, provided that resubmitted bids are in conformance with the instructions herein.
Bids may be withdrawn after bid opening only by providing written notice to City within five (5) working days of the bid opening and in compliance with Public Contract Code Section 5100 et
seq
., or as otherwise may be allowed with the consent of the City.
22. BIDDERS INTERESTED IN MORE THAN ONE BID
No Bidder shall be allowed to make, file or be interested in more than one bid for the same work unless alternate bids are specifically called for. A person, firm or corporation that has submitted a sub-proposal to a Bidder, or that has quoted prices of materials to a Bidder, is not thereby disqualified from submitting a sub-proposal or quot
ing prices to other bidders. No person, firm,
38077.00180\29080232.10 C2
-10-
00 21 13 – INSTRUCTIONS TO BIDDERS
corporation, or other entity may submit a sub-proposal to a Bidder, or quote prices of materials to a Bidder, when also submitting a prime Bid on the same Project.
23. SUBSTITUTION OF SECURITY
The Contract Documents call for monthly progress payments based upon the percentage of the Work completed. The City will retain a percentage of each progress payment as provided by the Contract Documents. At the request and expense of the successful Bidder, the City will substitute securities for the amount so retained in accordance with Public Contract Code Section 22300.
24. PREVAILING WAGES
The City has obtained from the Director of the Department of Industrial Relations the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Contract. These rates are available at the City or may be obtained online at http://www.dir.ca.gov. Bidders are advised that a copy of these rates must be posted by the successful Bidder at the job site(s).
25. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS
In accordance with the provisions of the Labor Code, contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code Sections 1777.1 or 1777.7. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid to a debarred subcontractor by the Contractor for the Project shall be returned to the City. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.
26. INSURANCE REQUIREMENTS
Prior to commencing work, the successful bidder shall purchase and maintain insurance as set forth in the General Conditions.
27. PERFORMANCE BOND AND PAYMENT BOND REQUIREMENTS
The successful bidder will be required to furnish a Labor and Material Payment Bond and a Faithful Performance Bond each in an amount equal to one hundred percent (100%) of the contract price. Each bond shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120 and is admitted by the State of California. Each bond shall be accompanied, upon the request of City, with all documents required by California Code of Civil Procedure Section 995.660 to the extent required by law. All bonding and insurance requirements shall be completed and submitted to City within ten (10) working days from the date the City provides the successful bidder with the Notice of Award.
38077.00180\29080232.10 C2
-11-
00 21 13 – INSTRUCTIONS TO BIDDERS
28. SALES AND OTHER APPLICABLE
TAXES, PERMITS, LICENSES AND FEES
Contractor and its subcontractors performing work under this Contract will be required to pay California sales tax and other applicable taxes, and to pay for permits, licenses and fees required by the agencies with authority in the jurisdiction in which the Work will be located, unless otherwise expressly provided by the Contract Documents.
29. FILING OF BID PROTESTS
Bidders may file a “protest” of a Bid with the City of Milpitas City Engineer. In order for a Bidder’s protest to be considered valid, the protest must:
A. Be filed in writing within five (5) calendar days after the bid opening date; B. Clearly identify the specific irregularity or accusation; C. Specify in detail the grounds for protest and the facts supporting the protest; and D. Include all relevant, supporting documentation with the protest at time of filing.
If the protest does not comply with each of these requirements, the City may reject the protest without further review.
If the protest is timely and complies with the above requirements, the City Engineer, or other designated City staff member, shall review the protest, any response from the challenged Bidder(s), and all other relevant information. The City Engineer will provide a written decision to the protestor.
The procedure and time limits set forth in this Article are mandatory and are the sole and exclusive remedy in the event of a Bid protest. Failure to comply with these procedures shall constitute a failure to exhaust administrative remedies and a waiver of any right to further pursue the Bid protest, including filing a Government Code Claim or legal proceedings.
30. BASIS OF AWARD; BALANCED BID
The City shall award the Contract to the lowest responsible Bidder submitting a responsive Bid.
The lowest Bid will be determined on the basis of the Total Base Bid alone unless otherwise set forth in the Notice Inviting Bids.
The City may reject any Bid which, in its opinion when compared to other Bids received or to the City’s internal estimates, does not accurately reflect the cost to perform the Work. The City may reject as non-responsive any Bid which unevenly weights or allocates costs, including but not limited to overhead and profit to one or more particular bid items.
31. AWARD PROCESS
Once all Bids are opened and reviewed to determine the lowest responsive and responsible Bidder, the City Council may award the contract. The apparent successful Bidder should begin to prepare the following documents: (1) the Performance Bond; (2) the Payment Bond; and (3) the required insurance certificates and endorsements. Once the City notifies the Bidder of the award, the Bidder will have fourteen (14) calendar days from the date of this notification to
38077.00180\29080232.10 C2
-12-
00 21 13 – INSTRUCTIONS TO BIDDERS
execute the Contract and supply the City with all of the required documents and certifications.
Regardless of whether the Bidder supplies the r
equired documents and certifications in a timely
manner, the Contract time will begin to run twenty-one (21) calendar days from the date of the Notice of Award. Once the City receives all of the properly drafted and executed documents, certifications from the Bidder, and any other documents as maybe specified in the Contract Documents, the City shall issue a Notice to Proceed to that Bidder.
32. EXECUTION OF CONTRACT
As required herein the Bidder to whom an award is made shall execute the Contract in the amount determined by the Contract Documents. The City may require appropriate evidence that the persons executing the Contract are duly empowered to do so. The Contract and bond forms to be executed by the successful Bidder are included within these Specifications and shall not be detached.
Manufacturer Part# Description Quantity Unit Price Ext. Price ***COUNCIL CHAMBERS - PHASE 1***
***Discussion System***
***Dais/Staff***
***Televic Quote # TCS-23288***
Televic Plixus MME + Dante Central Control Unit - Dante On Board 1.00 9,697.79 9,697.79 Televic Dante Audio Networking Card Central Control Unit, Dante Card (SEE ABOVE) 1.00 Programming/Tech 1.00 172.03 172.03
Televic Plixus NEXT Central Control Unit, Network Splitter 3.00 1,693.16 5,079.48 Programming/Tech 3.00 172.03 516.08
Televic Plixus PS Central Control Unit, Power Supply 1.00 2,698.04 2,698.04 Programming/Tech 1.00 172.03 172.03
Televic uniCOS T/MM10 Mic/Speaker/10" screen unit 2.00 3,888.76 7,777.51 Programming/Tech 2.00 172.03 344.06
Televic Confidea FLEX Mic/Speaker button unit 11.00 936.05 10,296.59 Programming/Tech 11.00 172.03 1,892.31
Televic Confidea D-MIC 50SL Gooseneck Mic, 50cm length 12.00 188.59 2,263.05 Programming/Tech 12.00 172.03 2,064.33
Televic A/R Discussion System - On-Site Certification & Training 1.00 4,817.93 4,817.93 Programming/Tech 8.00 172.03 1,376.22
***Software/License***
Televic CoCon Nameplate Discussion System - Nameplate Software 1.00 2,998.80 2,998.80 Televic CoCon Signage Discussion System - Signage Sofware 1.00 1,915.20 1,915.20 Televic CoCon Discussion Discussion System - Conference Sofware 1.00 4,095.00 4,095.00 Programming/Tech 8.00 172.03 1,376.22
NETWORK/CATEGORY CABLE 1,000.00 0.99 993.19
AV Install Labor 10.00 153.85 1,538.46
***COUNCIL CHAMBERS - PHASE 2***
***Audio System - Reinforcement***
***DSP***
QSC CORE 8 FLEX Unified Core with 8 local audio I/O channels, 64x64 network I/O channels wi 1.00 2,540.98 2,540.98 Install Labor 1.00 153.85 153.85
Programming/Tech 8.00 172.03 1,376.22
QSC I/O USB Bridge Q-SYS PoE bridging endpoint for AV-to-USB Bridging. Delivers driverless usb 1.00 1,808.17 1,808.17 Install Labor 1.00 153.85 153.85
QSC SLDAN-32-P Q-SYS Software-based Dante 32x32 Channel License, Perpetual. 1.00 797.85 797.85 Programming/Tech 1.00 172.03 172.03
***Wireless Mics***
Shure ULXD4Q=-G50 Quad Digital Wireless Receiver with internal power supply, 1/2 Wave Antenna 1.00 6,528.77 6,528.77 Install Labor 1.00 153.85 153.85
Shure ULXD2/SM58=-G50 Handheld Transmitter with SM58® Microphone 2.00 615.73 1,231.46 Shure ULXD1=-G50 Digital Wireless Bodypack Transmitter with Miniature 4-Pin Connector 2.00 573.82 1,147.64 B3 Countryman Mic 2.00 325.22 650.43
Shure SB900B RECHARGEABLE BATTERY 8.00 115.63 925.04
Shure SBC220-US 2 Bay Networked Docking Station 2.00 417.72 835.43 Install Labor 1.00 153.85 153.85
Shure UA864US Wall-Mounted Wideband Antenna 2.00 489.99 979.97 Install Labor 4.00 153.85 615.38
***Reinforcement Systems - Chambers***
QSC AD-S162T-BK 2.75" Full-range (x16) element column surface speaker, 70/100V transformer 2.00 1,001.65 2,003.30 Install Labor 6.00 153.85 923.08
QSC CX-Q 2K4 4-Channel 500W/CH Q-SYS Network Amplifier, Lo-Z, 70V, 100V direct drive, Fl 1.00 2,566.99 2,566.99 Install Labor 1.50 153.85 230.77
***Digital Nameplates***
***Televic Quote # TCS-23288***
Televic Plixus NP-1 Single-Side Digital Nameplate 11.00 1,271.93 13,991.25 Programming/Tech 11.00 172.03 1,892.31
***Public Speaker's Lectern***
***Televic Quote # TCS-23288***
Televic Confidea F-DM Mic unit, flush-mount 4.00 578.15 2,312.60 Televic Confidea D-MIC 70SL Gooseneck Mic, 70cm length (extra long) 4.00 206.48 825.93 Programming/Tech 4.00 172.03 688.11
***Utility***
3' Audio Patch Cord 10.00 108.40 1,084.04
TBD Custom Audio Patchbay 2.00 1,445.38 2,890.76
In Shop Assembly 16.00 153.85 2,461.54
RDL STD-600 Passive Audio Divider/Combiner - 600 Ohm 4.00 81.87 327.47 Install Labor 4.00 153.85 615.38
RDL TX-AT1 Audio Isolation Transformer - 600 Ohm 1:1 4.00 130.23 520.92 Install Labor 4.00 153.85 615.38
3' Data Patch Cord 20.00 108.40 2,168.07
TBD Custom Data Patchbay 3.00 722.69 2,168.07
In Shop Assembly 24.00 153.85 3,692.30
***Assistive Listening***
Milpitas City Council Chambers AV Replacement PCD Itemized Pricing
Listen Tech LW-150P-02-01-D Listen Tech Listen EVERYWHERE 2 Channel Wi-Fi Audio Server (Dante) 1.00 1,308.06 1,308.06 Listen Tech LA-326 Universal Rack Mounting Kit 1.00 75.17 75.17 Install Labor 1.00 153.85 153.85
Listen Tech LWR-1020-A1 Listen tech Listen EVERYWHERE WiFi Audio Receiver 1020 12.00 375.80 4,509.58 Listen Tech LA-481-01 Docking Station Case 16 1.00 698.34 698.34 LA-438 Listen Tech Advanced Neck Loop (Adult) 4.00 86.72 346.89 Listen Tech LA-165 Stereo Headphones 12.00 22.72 272.69 Install Labor 3.00 153.85 461.54
***VIDEO SYSTEMS - PRESENTATION***
***Switching & Transport***
Crestron DM-NVX-360C DM NVX® 4K60 4:4:4 HDR Network AV Encoder/Decoder Card 6.00 1,430.92 8,585.54 Crestron DM-NVX-D30C DM NVX™ 4K60 4:4:4 HDR Network AV Decoder Card 7.00 1,033.44 7,234.11 Crestron DM-NVX-E30C DM NVX™ 4K60 4:4:4 HDR Network AV Encoder Card 3.00 1,033.44 3,100.33 Crestron DMF-CI-8 DigitalMedia™ Card Chassis for DM-NVX-C & DMCF, 8 Slots 3.00 1,589.92 4,769.75 Install Labor 3.00 153.85 461.54
Programming/Tech 24.00 172.03 4,128.67
Crestron DM-NVX-DIR-80 DM NVX Director™ Virtual Switching Appliance for 80 Endpoints 1.00 4,571.73 4,571.73 Install Labor 1.00 153.85 153.85
Programming/Tech 8.00 172.03 1,376.22
***Sources***
Crestron AM-3200 AirMedia® Series 3 Receiver 200 1.00 1,748.91 1,748.91 Install Labor 1.00 153.85 153.85
Programming/Tech 1.00 172.03 172.03
***Rack Monitor***
Marshall V-702W-12G Marshall Dual 7-Inch 3RU Rackmount 12G Monitor with Waveform / HDMI and 12G 1.00 2,457.14 2,457.14 Install Labor 1.00 153.85 153.85
***LED Display***ATS PRO QUOTE 4266***
ATS PRO CUSTOM ATS PRO 9'x16' LED WALL Package W/Spares, Monting, Processor 1.00 80,248.75 80,248.75 ATS PRO ATS PRO Freight 1.00 2,657.34 2,657.34
ATS PRO ATS PRO Onsite Commissioning 1.00 5,594.40 5,594.40 Finish 80.00 153.85 12,307.68
Programming/Tech 16.00 172.03 2,752.44
***Flat Panel Display - Chambers***
Panasonic TH-86CQE2U Panasonic 86-inch UHD 400cd/m2 LED LCD w/Tuner 2.00 5,203.36 10,406.72 CHIEF PDRUB LARGE DUAL ARM W/ UNIVERSAL 2.00 921.08 1,842.16 Install Labor 16.00 153.85 2,461.54
Crestron DM-NVX-D30 DM NVX™ 4K60 4:4:4 HDR Network AV Decoder 2.00 1,033.45 2,066.90 Install Labor 2.00 153.85 307.69
***Dais***
Elo E511214 Elo Touch 2270L 22" Full HD Touchscreen Commercial Monitor (Black) 9.00 6,374.12 CHIEF K1D220BXRH K1D220 REDUCED HEIGHT BLK 9.00 428.41 3,855.69 Install Labor 13.50 153.85 2,076.92
Crestron DM-NVX-D30 DM NVX™ 4K60 4:4:4 HDR Network AV Decoder 1.00 1,033.45 1,033.45 Install Labor 1.00 153.85 153.85
Crestron HD-DA8-4KZ-E 1:8 HDMI® Distribution Amplifier w/4K60 4:4:4 & HDR Support 2.00 794.96 1,589.92 Install Labor 2.00 153.85 307.69
Extron 60-1603-01 SW2 HD 4K PLUS 9.00 462.52 4,162.69
Extron 70-212-01 MBU 123 9.00 44.81 403.26
Install Labor 9.00 153.85 1,384.61
***Dais - Input Panel***
Crestron HD-TX-4KZ-101-1G-W DM Lite® 4K60 4:4:4 Transmitter for HDMI® Signal Extension over CATx Cable, 1.00 325.21 325.21 Install Labor 1.00 153.85 153.85
Crestron HD-TX-4KZ-111-1G-B DM Lite® 4K60 4:4:4 Transmitter for USB-C® DisplayPort™ Signal Extension ov 1.00 375.80 375.80 Install Labor 1.00 153.85 153.85
Crestron DM-NVX-E760C DM NVX® 4K60 4:4:4 HDR Network AV Encoder Card with DM® Input 2.00 1,510.43 3,020.85 Install Labor 2.00 153.85 307.69
***Clerk***
CHIEF K1D220BXRH K1D220 REDUCED HEIGHT BLK 1.00 428.41 428.41 Install Labor 1.50 153.85 230.77
Crestron DM-NVX-351 DM NVX® 4K60 4:4:4 HDR Network AV Encoder/Decoder with Downmixing 1.00 1,828.40 1,828.40 Install Labor 1.00 153.85 153.85
***Presenter's Podium***
TBD HDMI+USB Custom Panels 1.00 216.81 216.81
Interion Labor/Trim 1.00 153.85 153.85
Crestron HD-PS401 4x1 4K60 4:4:4 HDR Presentation System 1.00 2,543.86 2,543.86 Install Labor 1.00 153.85 153.85
Crestron DM-NVX-E760C DM NVX® 4K60 4:4:4 HDR Network AV Encoder Card with DM® Input 1.00 1,510.42 1,510.42 Install Labor 1.00 153.85 153.85
TBD TBD 22" Display 1.00 322.29 322.29
Install Labor 1.00 153.85 153.85
FSR OWB-X3-SM-GNG Outdoor Wall Box - Surface Mount - 2 x 3Gang and 2 2/4 Gang Openings 1.00 1,965.36 1,965.36 Install Labor 1.00 153.85 153.85
***BROADCAST SYSTEMS***
***Video Switcher - Frame***
***NewTek Quote#******
Newtek TC1 Pro Video Switcher 1.00 19,822.32 19,822.32
Newtek Flex Video Switcher Control Surface, IP 1.00 11,769.51 11,769.51 Newtek RR2RU3RU Video Switcher- Rack Rails 1.00 324.87 324.87 Install Labor 1.00 153.85 153.85
Programming/Tech 40.00 172.03 6,881.11
***Video Switcher - Monitoring***
BMD BMD-HDL-SMTV4K12G2 SmartView 4K 2 2.00 1,382.06 2,764.11 Install Labor 2.00 153.85 307.69
TBD TBD 42" Display 1.00 757.11 757.11
Install Labor 1.00 153.85 153.85
Extron 26-650-175 HDMI Pro/175 - 175' (53.2 m) 1.00 791.52 791.52 Install Labor 4.00 153.85 615.38
***Video Switcher - Traning & Set Up***
JB&A JBA-NTK-TRN-ONL-INTRO Production Video Switcher- Remote User Training 3.5 Hour Training 2.00 3,150.00 6,300.00 JB&A JBA-NTK-RMT-COMTC Production Video Switcher- Remote Setup 1.00 3,150.00 3,150.00 ***Video Switcher- Warranty/Subscriptions***
Newtek NPSubA Video Switcher- Premium Access (includes live panel) 1.00 2,318.40 2,318.40 Newtek Live Panel Video Switcher- Live Panel (SEE ABOVE) 1.00 Newtek PTUTC1 Switcher - 1 year warranty professional 5.00 1,910.16 9,550.80 Newtek PTUFCP Control Surface - 1 year warranty professional 5.00 1,154.16 5,770.80 Programming/Tech 8.00 154.98 1,239.84
***Routing***
BMD BMD-VHUBSMARTE12G4040 Smart Videohub 12G 40x40 1.00 5,500.69 5,500.69 Install Labor 1.00 153.85 153.85
Programming/Tech 4.00 172.03 688.11
BMD BMD-VHUB/WSC/PRO Videohub Smart Control Pro 1.00 765.36 765.36 Install Labor 1.00 153.85 153.85
***Signal Processing***
Aja GEN10 AJA GEN10 SD/HD/AES Sync Generator 1.00 529.97 529.97 Install Labor 1.00 153.85 153.85
Aja C10da AJA C10DA Analog Video/Tri-Level Sync 1x6 Distribution Amplifier 2.00 275.31 550.62 Install Labor 2.00 153.85 307.69
Decimator 12G-CROSS Decimator Design HDMI/SDI 4K Ultra HD Cross Converter with Scaling and Fram 2.00 633.22 1,266.43 Install Labor 2.00 153.85 307.69
Newtek Spark 4k Newtek NDI to/from HDMI 2.00 1,101.24 2,202.48 Install Labor 2.00 153.85 307.69
***Audio***
Harman C2PS Control 2P Stereo Set. Includes one C2PM powered master, one Passive Extens 2.00 280.41 560.81 Install Labor 1.00 153.85 153.85
***Camera - Chambers***
Panasonic AW-UE100 PTZ Camera, NDI + 12G SDI output, Black 6.00 8,895.14 53,370.81 Panasonic FEC-100WM PTZ Camera Mount, Black 6.00 277.17 1,663.01 Install Labor 15.00 153.85 2,307.69
Mardhall CV-370 HD Color Camera, Fixed, NDI 1.00 1,101.24 1,101.24 TBD A/R HD Color Camera Lens 1.00 206.49 206.49
TBD A/R Camera Mount 1.00 48.18 48.18
Install Labor 2.50 153.85 384.62
Black Magic Micro Converter HDMI to SDI 12G 4k HDMI to SDI 12G 1.00 220.25 220.25 Install Labor 1.00 153.85 153.85
***Streamer/Recorder***
Crestron DM-NVX-D30 DM NVX™ 4K60 4:4:4 HDR Network AV Decoder 1.00 1,033.45 1,033.45 Install Labor 1.00 153.85 153.85
Decimator Decimator 2 SDI to CV scaler w/ CC support 1.00 447.38 447.38 Install Labor 1.00 153.85 153.85
TBD A/R 256GB SD Card 2.00 48.18 96.36
Aja Helo Plus Stream/Record unit - SD 1.00 2,243.78 2,243.78 Install Labor 1.00 153.85 153.85
Crestron DM-NVX-D30 DM NVX™ 4K60 4:4:4 HDR Network AV Decoder 1.00 1,033.45 1,033.45 Install Labor 1.00 153.85 153.85
***Zoom/Teams Integration***
TBD A/R HDMI to/from USB 2.00 68.83 137.66
TBD A/R SDI to/from USB 2.00 68.83 137.66
Install Labor 2.00 153.85 307.69
Decimator 12G-CROSS 12GSDI to/from HDMI 2.00 633.22 1,266.43 Install Labor 2.00 153.85 307.69
NDI NDI Tools NDI Software 2.00 126.00 252.00
Audinate DVS DVS Software 2.00 126.00 252.00
Programming/Tech 4.00 172.03 688.11
***Broadcast Desk***
Crestron DM-NVX-D30 DM NVX™ 4K60 4:4:4 HDR Network AV Decoder 1.00 1,033.45 1,033.45 Install Labor 1.00 153.85 153.85
TBD HDMI * USB * Audio Custom Panels 1.00 344.14 344.14 Interion Labor/Trim 1.00 153.85 153.85
Crestron DM-NVX-351 DM NVX® 4K60 4:4:4 HDR Network AV Encoder/Decoder with Downmixing 1.00 1,828.40 1,828.40 Install Labor 1.00 153.85 153.85
***Utility***
TBD 3' Video Patch Cord 10.00 103.24 1,032.42
TBD Looping plug 4.00 61.95 247.78
TBD Custom Custom Video Patchbay 2.00 2,597.55 5,195.10 In Shop Assembly 16.00 153.85 2,461.54
TBD 3' Patch Cord 8.00 103.24 825.93
TBD Custom AVP Bulkhead Patchaby 2.00 344.14 688.28
In Shop Assembly 16.00 153.85 2,461.54
***CONTROL SYSTEM***
Programming/Tech - ALLOWANCE PER SPECS 50.00 172.03 8,601.39 Crestron CP4N 4-Series™ Control System 1.00 2,225.88 2,225.88
Install Labor 1.00 153.85 153.85
Programming/Tech 8.00 172.03 1,376.22
Crestron TS-1070-B-S 10.1 in. Tabletop Touch Screen, Black Smooth 2.00 2,623.37 5,246.73 Install Labor 4.00 153.85 615.38
Programming/Tech 16.00 172.03 2,752.44
Crestron C2N-CBD-E-B-S Cameo® Express Keypad, Standard Mount, Black Smooth 9.00 222.59 2,003.30 Extron 70-1097-01 SMB 111 One-gang, Black 9.00 158.99 1,430.93 Install Labor 9.00 153.85 1,384.61
Crestron CEN-IO-RY-104 Wired Ethernet Module with 4 Relay Ports 1.00 294.86 294.86 Install Labor 1.00 153.85 153.85
***iPad Controls***
iPort TBD iPort iPad Cas for OFE Device 1.00 481.80 481.80 ***Speaker Timer***
DSAN PSL-20v DSAN Public Speakeing Timer 4.00 302.84 1,211.36 Install Labor 4.00 153.85 615.38
DSAN ASL4-ND3 DSAN Public Speaeking Timer 1.00 1,135.65 1,135.65 Install Labor 1.00 153.85 153.85
Tripplite DWF1327M Tripplite Wall Bracket 2.00 34.42 68.83 Install Labor 2.00 153.85 307.69
***Speaker Timer - Video Clock***
DSAN VC-2000LT DSAN Timer Video/Clock Interface 1.00 392.31 392.31 Install Labor 1.00 153.85 153.85
MAP TBD MAP Rack Shlf for PC 1.00 206.49 206.49
In Shop Assembly 1.00 153.85 153.85
***Utility Plates & Panels***
Middle Atlantic PD-915R 9OUT,15A,RCKMNT POWER CEN 2.00 143.10 286.19 In Shop Assembly 2.00 153.85 307.69
Middle Atlantic PD-DC- DC PWR DIST,125W RKMNT 2.00 505.88 1,011.76 In Shop Assembly 2.00 153.85 307.69
Middle Atlantic UPX-RLNK-1000R-2 UPS, 1000VA, Fanless, LAN 2.00 1,626.06 3,252.11 In Shop Assembly 4.00 153.85 615.38
Middle Atlantic UPX-RLNK-2000R-2 UPS, 2000VA, Fanless, LAN 1.00 2,016.30 2,016.30 In Shop Assembly 2.00 153.85 307.69
***Furtniture***
Laguna Custom Laguna Design 1.00 13,110.00 13,110.00
In Shop Assembly 24.00 153.85 3,692.30
***Power Conditioner - Hardwired in Electrical Scope*** SurgeX PF-420 SurgeX 4-Circuit Power Conditiotner 1.00 4,625.21 4,625.21 ***LOBBY/PRE-FUNCTION/SIGNAGE (PHASE 2)***
***audio System***
***Reinforcement and Playback***
Shure ULXD4D=-G50 Dual Digital Wireless Receiver with internal power supply, 1/2 Wave Antenna 1.00 3,263.67 3,263.67 Install Labor 1.00 153.85 153.85
Shure ULXD2/B87A=-G50 Handheld Transmitter with BETA 87A Microphone 1.00 820.97 820.97 Install Labor 1.00 153.85 153.85
Shure ULXD1=-G50 Digital Wireless Bodypack Transmitter with Miniature 4-Pin Connector 1.00 573.81 573.81 B3 Countryman Mic 2.00 325.22 650.43
Shure SB900B RECHARGEABLE BATTERY 4.00 115.63 462.52
Shure SBC220-US 2 Bay Networked Docking Station 1.00 417.71 417.71 Install Labor 0.50 153.84 76.92
QSC CX-Q 4K8 8-Channel 500W/CH Q-SYS Network Amplifier, Lo-Z, 70V, 100V direct drive, Fl 1.00 5,047.26 5,047.26 Install Labor 2.00 153.85 307.69
***Video System***
***Display - Lobby/Prefunction***
Panasonic TH-55CQE1W 55" LCD Flat Panel Display (Lobby) 1.00 1,031.32 1,031.32 Install Labor 2.00 153.85 307.69
Panasonic TH-65CQE1WA 65" LCD Flat Panel Display (Pre-Function) 1.00 1,327.83 1,327.83 Install Labor 2.00 153.85 307.69
Crestron DM-NVX-D30 DM NVX™ 4K60 4:4:4 HDR Network AV Decoder 2.00 1,033.45 2,066.90 Install Labor 2.00 153.85 307.69
***Control System***
Crestron TSW-570-B-S 5 in. Wall Mount Touch Screen, Black Smooth 1.00 1,188.11 1,188.11 Install Labor 1.00 153.85 153.85
Programming/Tech 8.00 172.03 1,376.22
***FFE/LOOSE EQUIPMENT (PHASE 2)***
***Accessories***
PSC FPSC0015 PSC Press Train - Passive Audio Distribution Box 1.00 780.05 780.05 Audio Adpter Kit APPKIT PRO audio adapter kit, remote audio 1.00 314.64 314.64 Video Adapter Kit VDAP-1 VIDEO ADAPTER KIT, COMPREHENSIVE, 1.00 83.86 83.86 Liberty DL-ARDA Universal HDMI Adapter Ring 2.0 with 5 Cable Adapters 4.00 334.31 1,337.22 Neutrik NA3MM-B NEUTRIK, XLR-M/M Barrel Adapter 10.00 19.57 195.73 Neutrik NA3FF-B NEUTRIK,XLR-F/F Barrel Adapter 10.00 21.84 218.41 Musson TBD MUSSON THEATRICAL, COTTON TIE LIN 600' ROLL, 1/8'' 1.00 45.89 45.89 Sony MDR-7506 SONY, HEADPHONES 2.00 131.09 262.18
***CABLES-AV***
Whirlwind MK410 Cable - Microphone, MK4, XLRF to XLRM, 10', Accusonic+2 4.00 37.10 148.40 Whirlwind MK425 Cable - Microphone, MK4, XLRF to XLRM, 25', Accusonic+2 10.00 45.03 450.32 Whirlwind MK450 Cable - Microphone, MK4, XLRF to XLRM, 50', Accusonic+2 4.00 69.99 279.97
Whirlwind MK4100 Cable - Microphone, MK4, XLRF to XLRM, 100', Accusonic+2 2.00 115.66 231.31 Whirlwind BNCRG6HD-010 Cable - BNC, RG6 HD/SDI, 75 Ohm, Belden 1694A, 10' 4.00 43.41 173.63 Whirlwind BNCRG6HD-025 Cable - BNC, RG6 HD/SDI, 75 Ohm, Belden 1694A, 25' 4.00 65.93 263.72 Whirlwind BNCRG6HD-050 Cable - BNC, RG6 HD/SDI, 75 Ohm, Belden 1694A, 50' 4.00 102.84 411.34 Extron 26-650-25 HDMI Pro/25 - 25' (7.6 m) 4.00 157.32 629.28 Bittree LPCXM3600-110 Bittree 1/4 Inch Long-Frame to Male XLR Patchcord - 36 Inch - Black 4.00 74.73 298.91 Bittree LPCXF3600-110 Bittree Female XLR to 1/4 Inch 110 Ohm Audio Adaptor Cable - Black 4.00 74.73 298.91 Bittree VPBM3600-75 Bittree VPBM3600-75 Mini-WECO to BNC Patchcord - 3G SDI - 36 Inch 4.00 41.95 167.81 Lex PE7000-25-515 LEX NEMA L5-20 to NEMA L5-20 25' 4.00 117.99 471.96 Lex PE7000-50-515 LEX NEMA L5-20 to NEMA L5-20 50' 4.00 209.76 839.04 Whirlwind MST2XM06US Cable - Adapter, 1/8" TRS male to (2) XLRM, 6', Canare MR202-2AT 2.00 43.17 86.34 Whirlwind MST06US Cable - 3.5mm TRS, male to male, 6' 2.00 13.32 26.64 NETWORK/CATEGORY CABLE 3,000.00 0.94 2,818.49
AV Install Labor 39.00 153.85 5,999.99
AUDIO LINE LEVEL CABLE 1,000.00 0.90 903.36
AV Install Labor 13.00 153.85 2,000.00
VIDEO CABLE 2,000.00 1.08 2,168.07
AV Install Labor 26.00 153.85 4,000.00
ANTENNA CABLE 1,000.00 1.95 1,951.27
AV Install Labor 13.00 153.85 2,000.00
CONTROL CABLE 1,000.00 0.72 722.69
AV Install Labor 13.00 153.85 2,000.00
Custom Panels 1.00 3,441.38 3,441.38
Interion Labor/Trim 24.00 153.85 3,692.30
Misc. Connectors & Accessories 1.00 2,175.47 2,175.47
Estimated Freight 1.00 9,956.38 9,956.38
Owner Training - CHECK SPEC REQUIREMENTS 48.00 172.03 8,257.33 Equipment Rental 1.00 1,575.00 1,575.00
Structural Engineering & Misc. 1.00 5,250.00 5,250.00
***DEMO*** 1.00 6,153.84 6,153.84
***RE-BUILD WALL SCOPE*** 1.00 12,600.00 12,600.00
***ELECTRICAL SCOPE*** 1.00 5,750.00 5,750.00
***PERMITS*** 1.00 1,150.00 1,150.00
Estimated Travel Cost 1.00 24,227.50 24,227.50
SHOP Drawings/Submittals 1.00 33,303.13 33,303.13
Bonds 1.00 14,396.40 14,396.40
743,761.88
2 ADD/ALT - AV#1: COMMITTEE ROOM 168
***Audio System***
QSC CORE 8 FLEX Unified Core with 8 local audio I/O channels, 64x64 network I/O channels wi 1.00 2,540.98 2,540.98 Install Labor 1.00 153.85 153.85
Programming/Tech 8.00 172.03 1,376.22
QSC SLDAN-32-P Q-SYS Software-based Dante 32x32 Channel License, Perpetual. 1.00 797.85 797.85 Programming/Tech 1.00 172.03 172.03
***Wireless Mics***
Shure ULXD4D=-G50 Dual Digital Wireless Receiver with internal power supply, 1/2 Wave Antenna 1.00 3,263.67 3,263.67 Install Labor 1.00 153.85 153.85
Shure ULXD2/B87A=-G50 Handheld Transmitter with BETA 87A Microphone 1.00 820.97 820.97 Install Labor 1.00 153.85 153.85
Shure ULXD1=-G50 Digital Wireless Bodypack Transmitter with Miniature 4-Pin Connector 1.00 573.81 573.81 B3 Countryman Mic 2.00 325.22 650.43
Shure SB900B RECHARGEABLE BATTERY 4.00 115.63 462.52
Shure SBC220-US 2 Bay Networked Docking Station 1.00 417.71 417.71 Install Labor 0.50 153.84 76.92
***Loudspeaker System***
QSC SPA2-60 1/2 RU 2 Channel ENERGY STAR amplifier / Stereo operation 60 watts into 8Ω 1.00 611.40 611.40 Install Labor 1.00 153.85 153.85
***ALS***
Listen Tech LW-150P-02-01-D Listen Tech Listen EVERYWHERE 2 Channel Wi-Fi Audio Server (Dante) 1.00 1,308.06 1,308.06 Listen Tech LA-326 Universal Rack Mounting Kit 1.00 75.17 75.17 Install Labor 1.00 153.85 153.85
***Video System***
***Switching & Transport***
Crestron HD-PS621 8x1 4K60 4:4:4 HDR Presentation System 1.00 3,497.81 3,497.81 Install Labor 1.00 153.85 153.85
Programming/Tech 8.00 172.03 1,376.22
Crestron HD-TX-4KZ-101-1G-B DM Lite® 4K60 4:4:4 Transmitter for HDMI® Signal Extension over CATx Cable, 2.00 325.22 650.43 Install Labor 2.00 153.85 307.69
Crestron HD-RXC-4KZ-101 DM Lite® 4K60 4:4:4 Receiver for HDMI®, RS-232, and IR Signal Extension ove 1.00 339.67 339.67 Install Labor 1.00 153.85 153.85
Crestron DM-NVX-D30 DM NVX™ 4K60 4:4:4 HDR Network AV Decoder 1.00 1,033.45 1,033.45 Install Labor 1.00 153.85 153.85
***Sources***
Crestron AM-3200 AirMedia® Series 3 Receiver 200 1.00 1,748.91 1,748.91 Install Labor 1.00 153.85 153.85
Programming/Tech 1.00 172.03 172.03
***Projection Display***
Panasonic PT-RZ690WU7 Pansonic WUXGA 1920 X 1200 6000 LMNS DLP LASER PROJECTOR W LENS - White 1.00 8,250.56 8,250.56 TBD TBD Projector Lift Adapter KIT 1.00 840.39 840.39
Install Labor 8.00 153.85 1,230.77
DA-LITE 24713LSI ADVANTAGE TNSD 113D HD1.3 1.00 6,504.20 6,504.20 Install Labor 20.00 153.85 3,076.92
DA-LITE 40975 3-BUTTON SWITCH-LVC,WHITE 1.00 94.53 94.53 Install Labor 1.00 153.85 153.85
***Conf. Mics***
Sennheiser TBD Sennehier Ceiling Mic 2.00 5,058.82 10,117.64 Install Labor 4.00 153.85 615.38
Huddly 7090043790948 Huddly L1 Kit with USB Adapter 1.00 3,222.88 3,222.88 Huddly TBD Camera Mount 1.00 45.12 45.12
Install Labor 2.00 153.85 307.69
Logitech Logitech MK270 Wireless Keyboard & Mouse Combo 1.00 38.68 38.68 ***Control System***
Crestron RMC4 4-Series™ Control System 1.00 794.96 794.96 Install Labor 1.00 153.85 153.85
Programming/Tech 1.00 172.03 172.03
Crestron CEN-IO-RY-104 Wired Ethernet Module with 4 Relay Ports 1.00 294.86 294.86 Install Labor 1.00 153.85 153.85
Crestron TS-1070-B-S 10.1 in. Tabletop Touch Screen, Black Smooth 1.00 2,623.36 2,623.36 Install Labor 1.00 153.85 153.85
Programming/Tech 8.00 172.03 1,376.22
3' Data Patch Cord 10.00 108.40 1,084.04
Custom Data Patchbay 1.00 722.69 722.69
In Shop Assembly 8.00 153.85 1,230.77
NETWORK/CATEGORY CABLE 1,000.00 0.94 939.50
AV Install Labor 13.00 153.85 2,000.00
CONTROL CABLE 1,000.00 0.72 722.69
AV Install Labor 13.00 153.85 2,000.00
Custom Panels 1.00 763.99 763.99
Interion Labor/Trim 16.00 153.85 2,461.54
Misc. Connectors & Accessories 1.00 802.63 802.63
Estimated Freight 1.00 1,224.46 1,224.46
Estimated Travel Cost 1.00 3,277.50 3,277.50
Bonds 1.00 2,099.00 2,099.00
83,209.00
3 ADD/ALT - AV#2: SLA
SLA Televic - Discussion System - SLA 1.00 2,797.20
SLA PCD City Council Chambers SLA 1.00 6,000.00
8,797.20
835,768.08
pg. 1
2023
PCD Key Company Personnel 2023
President / Sales Manager- John Rudolph, CTS
After many years as a licensed low voltage contractor designing AV systems for residential and commercial to include sales at Pacific Stereo, Soundworks and Shoreline Stereo, John migrated into Commercial / Professional sales at Sound Genesis in 1979 – 1983 in San Francisco focusing on building and designing radio stations, recording studios broadcast TV and private production systems, as well as commercial audio video systems. John then went back to consumer AV and worked for The Good Guys starting in 1987, first in sales, then as a store manager. John then created the custom installation division of the Good Guys and rolled it out to all of the California stores until 1999 when he left to join PCD as General Manager and Vice President.
• CTS Certified
• Extron - School of Emerging Technologies Certified
• Extron - School of Emerging Technologies 4K Certified • Biamp Certified
• Crestron Certified
• THX Level I and Level II Certified
• Listen Technologies Loop System Assisted Listening Designer Certified • Graduated from Recording Arts School
• Licensed C-7 contractor since 1990
Vice President - Bill Graham
Bill has an extensive background in multi-unit management within the consumer electronics and retail environments - Good Guys, Best Buy, Sears and owner of a Consumer Electronics business. As Director of Custom Installation for the Good Guys, 53 retail locations were serviced. Possesses a California Real Estate Broker’s license, managing branch offices.
• 8+ years with PCD
• 36+ years of experience
• Human Resources
Operations Manager - Joe Koppy
Joe manages installation schedule, service calls and vehicle fleet. He is also responsible for inventory accuracy and moving equipment to the job sites. He organizes Safety Trainings on Smartsheet’s for the field team.
• Safety Officer
pg. 2
Procurement Manager – Jim Jones
Jim owned and operated Shoreline Audio Video in Mill Valley until 2009 when he joined Summit Electronic Systems in Petaluma overseeing creation of proposals, managing projects and carrying through projects to completion for high end clients. He was hired at PCD as Project Manager in 2011, and was promoted to Purchasing Manager in 2018. Jim is responsible for scheduling, purchasing, labor assignment and client contact during production.
• 12+ years with PCD
• 22+ years of experience
Master Technician / Programmer – Angelo Scalese
Angelo worked in professional audio from 2001 – 2007 for HomeTech and Best Buy as a Lead Technician. He was responsible for running large and small residential home integration Projects. Angelo joined PCD in in 2007, and is currently running large commercial projects that include conference rooms with video and voice reinforcement with DSP and Crestron and AMX programming. Highly certified, he is one of the Senior Technicians at PCD.
• Crestron – Programmer Level 1 & 2
• Crestron –DigitalMedia Networking Certification (DM-NVX-N) • Crestron – Crestron DigitalMedia Certification (DM-NVX) • Crestron - Fusion Programmer (CTI-FUSION-P)
• Symetrix – Symnet Composer
• QSC – Q-SYS DSP platform
• Extron Control Specialist certified
• Extron – GC3 Programmer & Touchlink Certified Control Associate • CEDIA – Installer Level I & II
• AXIS - Communications Academy AXIS Boot Camp Certified • BIAMP Systems - BIAMP VOCIA Certified
• BIAMP Systems - BIAMP TESIRAFORTE Certified
• Extron - GC PRO Certified
• CA State VDV #160978
Systems Engineer – Gordon Barnes
Worked for Furman Sound and EMG, both manufacturers of quality professional audio components. Started with PCD in 2008 and holds responsibility for design documents, custom fabrication and closeout documents. In early 2017, Gordon relocated to the San Francisco Bay Area and worked as a Project Engineer for a large AV integrator. He worked there for about a year and a half and in late 2018 he moved back to the North Bay and came back to PCD.
pg. 3
• 13+ Years with PCD
• 28+ Years in Electrical Engineering/Construction
• Crestron – Crestron DigitalMedia Certification (DM-NVX) • Crestron – Crestron DMC D-4K Certified
• Extron - XTP Systems Technician Certified
• Biamp - Tesira Forte Certified
• QSC – Q-SYS Level 1 Certified
• QSC – Q-SYS Level 2 Certified
• OSHA 10 Certified
Design-Build Consultant – Joe Laxague
For over 20 years, Joe Laxague has been a notable AV professional who has worked with key industry professionals from fortune 500 companies, government, education, to large scale event production and more. Joe was the production manager for concerts featuring multiple high-profile national touring acts. Joe also has a deep knowledge of Commercial AV & Design-holding an extensive list of key industry credentials from Extron, Biamp, QSC, Shure, OSHA and more. He studied Audio Engineering at Butte College and was their founder and first president of the Music and Audio Production Club.
• CTS Certified
• AVIXA Essentials of AV Technology
• AVIXA AV Technologist
• AVIXA Networking Technology
• AVIXA AV Math for Design
• AVIXA Drawings and Documentation
• BiAmp Tesira Forte
• Extron AV Associate
• Extron Control Specialist
• QSC Q-SYS Level 1
• Shure Integrated Systems Certification Level 1 & 2
• OSHA 30
• Audinate Dante Certification Level 1 & 2
• SynAudCon Course 110 – Transformer Distributed Loudspeaker Systems • SynAudCon Course 100 – Principles of Audio
• SynAudCon Course 50 – How Sound Systems Work
pg. 4
General Manager – Ted Sprague
Ted is involved with managing operations, engineering, marketing, human resources, field personnel, procurement and bid/estimating. He has worked in the system integration industry since 2002 and has previously held positions in: f ield operations, systems design, project management, sales, and senior management. While most of his experience has been on the residential side of the industry, he also has experience with small commercial projects, outsourced IT managed services, and manufacturing for a speaker company.
Project Name: Rohnert Park Council Chambers (PCD#21481) Project Address/Location: 130 Avram Ave., Rohnert Park, CA 94928 Project Owner / Contact / Telephone: City of Rohnert Park, Laura Luchini (Project Coordinator,[email protected], 707-588-3308 Project Architect / Telephone: The Shalleck Collaborative, 415-956-4100 General Contractor / Telephone: N/A worked with owner
Scope of Work:
Provided upgrades to City Council Chambers Audiovisual systems including new Winsted Broadcast furniture, Middle Atlantic racks, a Da-Lite projection screen, NewTek TriCaster live production system, Panasonic laser projectors and PTZ cameras, QSC control and DSP systems, VSI video over IP encoders/decoders, DSAN speaker clocks/timer, and Televic Discussion system.
Initial Completion: 8/25/2023
Actual Completion: 8/25/2023
Initial Contract Value $429,883.00
Final Contract Value $447,681.87
Project Name: Town of Windsor (PCD#22045 & PCD#21179)
Project Address/Location: 9291 Old Redwood Hwy, Windsor, CA 95492 Project Owner / Contact / Telephone: Town of Windsor, Jule Taylor, [email protected], 707-838-5365 Project Architect / Telephone: N/A
General Contractor / Telephone: N/A worked with owner
Scope of Work:
Serveral upgrades over the past few years; Upgrade of city council chambers for streaming and conference room two hall meetings, and also upgrade AVAAS tricaster upgrade Initial Completion: 5/10/2022
Actual Completion: 5/10/2022
Initial Contract Value $87,567.00
Final Contract Value $104,320.75
Project Name: SoCo BOS Chamber AV Upgrade (PCD#22201)
Project Address/Location: 575 Administration Drive, Santa Rosa, CA 95403 Project Owner / Contact / Telephone: County of Sonoma, 707-565-7500 Project Architect / Telephone: Worked with General Contractor General Contractor / Telephone:
Danco Builders, Charles Barnhart (PM) & Zach Niehaus, [email protected]; [email protected], 707-822-9000, 707-825-1534
Scope of Work:
PCD was requested to provide a formal RFP to update and upgrade the Sonoma County Board of Supervisors chambers where there is a existing broadcast system with cameras and microphones, projection, loudspeakers and monitors. PCD designed a new upgrade to bring the system to the “state of the art” technology utilizing Newtek Tricaster, Biamp DSP, Panasonic NDI HD cameras and a new Extron control system to operate the system. PCD successfully completed the installation late December 2022 followed up with small adjustments in early January 2023. The client is pleased with the system upgrades and streaming and recording are now clean and clear and trouble free.
Initial Completion: 1/3/2023
Actual Completion: 1/3/2023
Initial Contract Value $242,796.11
Final Contract Value $238,385.90
Project Name: Los Altos City Council Chambers (PCD#20061) Project Address/Location: 1 North San Antonio Road, Los Altos, CA 94022 Project Owner / Contact / Telephone: City of Los Altos, (650) 947‑2700 Project Architect / Telephone: Co+Ed Architecture
General Contractor / Telephone: Integra Construction Services Inc, Alexander Giammona, [email protected], (925) 398-8290 Scope of Work:
Provided upgrades to City Council Chambers Audiovisual systems including new Winsted Broadcast furniture, Middle Atlantic racks, a custom Draper fixed/curved projection screen, NewTek TriCaster live production system, Panasonic flat panel displays, Digital Projection laser projector, Panasonic PTZ cameras, QSC DSP systems, Crestron video over IP encoders/decoders, DSAN speaker clocks/timer, Shure wireless microphone systems, Listen Tech assisted listening system, Telview custom bulletin board system, and Taiden Discussion system.
Initial Completion: 1/24/2023
Actual Completion: 1/24/2023
Initial Contract Value $180,000.00
Final Contract Value $193,216.65
Project Name: City of Santa Rosa UFO (PCD# 19117)
Project Address/Location: City of Santa Rosa, 635 First Street, 2nd Floor, Santa Rosa, CA 95404 Project Owner / Contact / Telephone: City of Santa Rosa, Brian Kilkenny (PM), 707-543-3116, [email protected] Project Architect / Telephone: n/a - PCD
Boardroom / City Council Projects
General Contractor / Telephone: n/a - PCD
Scope of Work:
Provided and installed upgrade of AV Systems for three meeting rooms and control room including removal and replacement of three projectors, screens and PTZ video cameras, and ceiling speakers. Installed six owner furnished TVs and mounts, and associated wiring.
Initial Completion: 2/5/2020
Actual Completion: 2/5/2020
Initial Contract Value $422,429.98
Final Contract Value $422,429.98
Project Name: Eureka City Council AV Upgrade (PCD#21387) Project Address/Location: 531 K Street, Eureka, CA 95501 Project Owner / Contact / Telephone: City of Eureka, Brian Gerving, [email protected], (707) 441-4203 Project Architect / Telephone: N/A
General Contractor / Telephone: N/A
Scope of Work:
Installed 2 new 5000 lumen laser projectors, new wiring and tricaster for screaming, along with 9 new 10" table top Dais and Staff monitors.
Initial Completion: 8/27/2021
Actual Completion: 8/27/2021
Initial Contract Value $119,811.27
Final Contract Value $119,811.27
Project Name: Finley Community Center (PCD#19141)
Project Address/Location: 635 First Street, 2nd Floor, Santa Rosa, Ca 95401 Project Owner / Contact / Telephone: City of Santa Rosa, Jennifer Myles, [email protected], 707-543-3709 Project Architect / Telephone: N/A - worked directly with Owner General Contractor / Telephone: N/A - worked directly with Owner Scope of Work:
PCD designed and provided a new AV Upgrade to allow HD projection of presentation content along with an upgrade for the sound system to better control the sound in the highly reflective surfaces. PCD also included a touch panel control system to allow users a intuitive macro based touch panel that sequentially turns on and switches sources for ease of use by end users.
The system is now more user friendly and operates and performs with the latest in technology for video presentations as well as much better sound quality to the audience with minimized reflections from the hardwood floors and walls.
Initial Completion: 1/31/2020
Actual Completion: 1/31/2020
Initial Contract Value 109,380.00
Final Contract Value 109,380.00
Project Name: Milpitas City Hall (PCD#19152, #19160)
Project Address/Location: 455 East Calavares Blvd., Milpitas, CA 95035 Project Owner / Contact / Telephone: City of Milpitas, Eliren Pasion, 408-586-3160 , [email protected] Project Architect / Telephone: N/A
General Contractor / Telephone: N/A
Scope of Work:
PCD added Sharp Commercial Digital Signange Displays, along with Crestron Systems. Upgraded several Conference rooms for City Hall as well as modernizing the city Lobby with displays Initial Completion: 1/8/2020
Actual Completion: 1/8/2020
Initial Contract Value $45,583.74
Final Contract Value $45,583.74
Project Name: Mountain View Whisman School District Boardroom (PCD# 19108) Project Address/Location: 1400 Montecito Ave, Mountain View, CA 94043 Project Owner / Contact / Telephone: Consultant: Greystone West - Jason Cave - [email protected] - 650-933-0624 , Novotny, Theresa , [email protected], :707-933-0624
Project Architect / Telephone: DTA Architects - Alice Ader - [email protected] General Contractor / Telephone: worked along with Greystone West, Mikael Estrada (PM), [email protected] Scope of Work: Boardroom AV Systems
Initial Completion: 2/6/2020
Actual Completion: 2/6/2020
Initial Contract Value $199,883.00
Final Contract Value $205,381.69
Project Name: SCOE ANNEX Building - Sonoma County Office of Education (PCD #17149) Project Address/Location: 5340 Skylane Blvd., Santa Rosa, CA 95403 Project Owner / Contact / Telephone: Contact- Daniel Bienkoski , [email protected], 707-524-8324 Project Architect / Telephone: n/a - PCD
General Contractor / Telephone: n/a - PCD
Scope of Work:
PCD to provide & install Audio/Video System including 3 video wall pop out Premeir Mount LMVS bracket along with installation totally 27 mounts.
Initial Completion: 8/2/2018
Actual Completion: 8/2/2018
Initial Contract Value $220,202.00
Final Contract Value $232,467.26
Project Name: Healdsburg City Council Chambers (PCD#17068) Project Address/Location: 401 Grove Street, Healdsburg, CA 95448 Project Owner / Contact / Telephone: City of Healdsburg - Heather Ippoliti - [email protected] - 707-431-3319 Project Architect / Telephone: n/a
General Contractor / Telephone: n/a - PCD
Scope of Work:
PCD provided and installed a new Streaming Broadcast System for the City Council Chambers which includes upgraded equipment capabilities allowing cleaner live feeds, smoother signal flow for microphones and archival storage of all broadcasts.
Original Completion Date: 2018
Date Completed: 2018
Initial Contract Value: $132,509.00
Final Contract Value: $137,725.00
Project Name: Sonoma County Office of Education (PCD#17149) Project Address/Location: 5340 Skylane Blvd., Santa Rosa, CA 95403 Project Owner / Contact / Telephone: Sonoma County Office of Education, Daniel Bienowksi, [email protected], 707-524-8324 Project Architect / Telephone: n/a
General Contractor / Telephone: n/a - PCD
Scope of Work:
PCD to provided & install Audio/ Video System including 3 video wall pop out Premier Mount LMVS bracket along with installation totally 27 mounts
Initial Completion: 8/2/2018
Actual Completion: 8/2/2018
Initial Contract Value: $220,202.00
Final Contract Value: $232,467.26
Project Name: Windsor Town Council AV Chamber (PCD#20056) Project Address/Location: 9291 Old Redwood HWY, Windsor, CA 95492 Project Owner / Contact / Telephone: Town of Windsor City Council, Jule Taylor, [email protected], (707) 838-5365 Project Architect / Telephone: N/A
General Contractor / Telephone: N/A - worked with Owner Scope of Work: Upgrade of city council chambers for streaming and conference room two hall meetings Initial Completion: 4/2/2018
Actual Completion: 4/2/2018
Initial Contract Value $39,600.52
Final Contract Value $42,418.02
Project Name: Traditional Medicinals (PCD#16127)
Project Address/Location: 4515 Ross Road, Sebastopol, CA 95472 Project Owner / Contact / Telephone: Jeffrey Flasher - [email protected] - 707-823-8911 Project Architect / Telephone: n/a - PCD
General Contractor / Telephone: n/a - PCD
Scope of Work:
Video Wall and Room 101 DSP ceiling microphone, AV systems for rooms#104, 106, 109, 115, provided projects for room 101, and 121.
Initial Completion: 7/7/2017
Actual Completion: 7/7/2017
Initial Contract Value $110,984.10
Final Contract Value $103,548.30
Project Name: Covia (formally Episcopal Senior Communities) PCD #18071 Project Address/Location: 2185 N California Blvd. #575, Walnut Creek, CA 94596 Project Owner / Contact / Telephone: Chris Dana - 925-956-7400 Project Architect / Telephone: N/A
General Contractor / Telephone: N/A
Scope of Work:
Provided AV Systems for new office spaces: Huddle rooms- OFCI Prowise displays, Boardroom & Fishbowel - 75'' LG Pro HD display NuReva sound /microphone bar and polycom Trio 8880, in the Gathering Space- provided and installed 3x3 video wall, Vaddio Matrix Pro AV Bridge, two Vaddio Roboshot cameras, wireless microphones and associated equipment.
Initial Completion: 6/27/2018
Actual Completion: 6/27/2018
Initial Contract Value $170,684.94
Final Contract Value $156,873.00
Project Name: Keysight Technologies - Fire Damage AV Replacements at Multiple Locations (PCD#18029) Project Address/Location: 1400 Fountaingrove Parkway, Santa Rosa, CA 95403 Project Owner / Contact / Telephone: Keysight/CBRE - Steve Howard (PM), [email protected], 707-799-8637 Project Architect / Telephone: N/A
General Contractor / Telephone: Worked directly with the Owner Scope of Work:
Provided and installed a new Laser 5000 Lumen projector mount in various rooms. Also added a Kramer wireless collaboration device and new screen.
Initial Completion: 6/1/2018
Actual Completion: 6/1/2018
Initial Contract Value $276,978.14
Final Contract Value $276,978.14
Project Name: Old Solano Courthouse (#21073)
Project Address/Location: 600 Union Ave, Fairfield, CA 94533 Project Owner / Contact / Telephone: Judicial Council of California Project Architect / Telephone: Hornberger + Worstell - Jim Degener - [email protected] - 415-391-1080 General Contractor / Telephone: Plant Construction Company - Aaron Holm - [email protected] Scope of Work:
PCD was awarded the contract for the rebuild of the historic courthouse for Solano County. In the three courtrooms, PCD provided and installed projection systems along with sound reinforcement systems and assisted listening in each.
Initial Completion: December 2014
Actual Completion: December 2014
Initial Contract Value $406,889.00
Final Contract Value $406,889.00
Project Name: Brentwood Community Center (#20879)
Project Address/Location: 150 City Park Way, Brentwood, CA 94513 Project Owner / Contact / Telephone: City of Brentwood
Project Architect / Telephone: Yun Cho - 925-516-5104 - [email protected] General Contractor / Telephone: n/a - PCD
Scope of Work:
PCD provided a design assist on the new city government complex including city council chambers, video conferencing meeting hall and park stage sound reinforcement system used for summer concerts for the community. All systems were provided and installed by PCD and, since the initial installation date, have been requested to provide and install additional add-on features and improvements to the initial design to enhance the facilities for meetings and events. This has turned out to be a great working relationship with the City of Brentwood and PCD.
Initial Completion: 2013
Actual Completion: 2013
Initial Contract Value $997,000.00
Final Contract Value $997,000.00
Project Name: Milpitas Council Chambers (#15023)
Project Address/Location: 455 East Calaveras Boulevard, Milpitas, California 95035 Project Owner / Contact / Telephone: Julie Waldron - 408-586-3314 - [email protected] Project Architect / Telephone: n/a
General Contractor / Telephone: n/a - PCD
Scope of Work:
Milpitas City Hall is a shining example of a state-of-the-art city council chamber. This facility was transformed from an older technology standard definition system to a six-camera high definition multi-faceted system. It is now capable of incredibly sharp presentations with rear projection video and ultra-clear audio in the comfortable theatre- like atmosphere in the council chamber. Then they can take those meetings to the high definition level and broadcast them out to the world, keeping up with the studio quality you see from the big networks. This is the benchmark for any modern city council chamber.
Date Completed: 2012
Initial Contract Value $1,036,945.82
Final Contract Value $1,036,945.82
Project Name: Claybank Adult Detention Facility (PCD#14035) Project Address/Location: 675 Texas Street, Suite 2500, Fairfield, CA 94533 Project Owner / Contact / Telephone: Solano County Department of General Services Project Architect / Telephone: n/a
General Contractor / Telephone: Collins Electrical Company Inc
Scope of Work:
PCD was awarded the AV package for the new correctional facility to include Conference Room AV systems, video conference room and the AV for the prison TV sets in the day rooms and the meeting rooms to distribute self driven content and some TV channels to the inmates.
Initial Completion: 2014
Actual Completion: 2014
Initial Contract Value: $577,348.00
Final Contract Value: $577,348.00
Project Name: Cal Fire Academy (PCD#13158)
Project Address/Location: 4501 Highway 104, Ione, CA 95640 Project Owner / Contact / Telephone: State of California Forestry & Fire Protection, Peter Billing, [email protected], 209-274-5991 Project Architect / Telephone: n/a
General Contractor / Telephone: n/a - PCD
Scope of Work:
PCD provided and installed the training academy in Ione, CA with complete HD AV presentation systems for their Lecture Halls, Amphitheater and classroom teaching audio video and sound reinforcement systems.
Initial Completion: 2014
Actual Completion: 2014
Initial Contract Value: $394,788.00
Final Contract Value: $394,788.00
Project Name: Sonoma County Board of Supervisors Meeting Room (#21022) Project Address/Location: 575 Administration Drive, Room 100 A, Santa Rosa, CA 95403 Project Owner / Contact / Telephone: County of Sonoma, John Hubiak - 707-565-2241 - [email protected] Project Architect / Telephone: N/A
General Contractor / Telephone: n/a
Scope of Work:
PCD provided a design assist on the upgrade and renovation of the Sonoma County Board of Supervisors chamber which included HD cameras and video production console to stream to the internet and archive for storage the various meetings held in the facility. New presentation equipment to include HD projector and distribution to flat panels in various conference rooms and lobby and re-programming of the touch panel control system created a more usable and better quality system overall.
Initial Completion: 2012
Actual Completion: 2012
Initial Contract Value $179,355.00
Final Contract Value $179,355.00
Project Name: Cache Creek Hotel Expansion (PCD#17150)
Project Address/Location: 14455 Hwy 16, Brooks, CA 95606 Project Owner / Contact / Telephone: Yocha Dehe Wintun Nation, Scott Adamson and Lars Sequiera, 530-796-5742, 530-796-5286, SAdamson@yochadehe- nsn.gov, [email protected]
Project Architect / Telephone: N/A
General Contractor / Telephone: Worked directly with Owner Scope of Work:
PCD to install and supply theatrical audio video systems, including AV devices, and configure and demonstrate portable systems
Initial Completion: 2/18/2021
Actual Completion: 2/18/2021
Initial Contract Value: $1,998,788
Final Contract Value: $2,775,615.10
Project Name: GMC/Shroeder Hall/Student Services, Sonoma State University, Rohnert Park, CA (PCD # Various) Project Address/Location: Sonoma State University - 1801 E. Cotati Ave., Rohnert Park, CA 94928 Project Owner / Contact / Telephone: Christopher Dinno, Senior Director Facilities - [email protected] - (707) 664-2870 Project Architect / Telephone: William Rawn Associates (617) 423-3470 General Contractor / Telephone: Rudolph & Sletten - (650) 216-3600 Scope of Work: Audio/Visual System – Performing Arts Center, Recital Hall and Student Center Initial Completion: 6/11/2012
Actual Completion: 6/11/2012
Initial Contract Value: $1,713,887.00
Final Contract Value: $1,713,887.00
Project Name: HP Moffett Towers Bldg F&G (PCD#20934)
Project Address/Location: Moffett Towers, 1140 Enterprise Way, Sunnyvale, CA 94089 Project Owner / Contact / Telephone: Moffett Towers c/o Jay Paul Company, Owner - [email protected] - (415) 397-0442 Project Architect / Telephone: Charles M. Salter Associates Inc. (415) 397-0442 General Contractor / Telephone: Rudolph & Sletten / (650) 216-3600 Scope of Work:
PCD provided and installed 79 conference rooms with LCD flat panel TV sets and AV input and control as well as (9) video projection / video conferencing rooms and a multi use Cafeteria with complete AV presentation at Hewlett Packard Moffett Towers in Mountain View.
Initial Completion: December 2012
Actual Completion: December 2012
Initial Contract Value: $1,000,071.00
Final Contract Value: $1,414,453.00
Project Name: DeAnza High School (PCD#20811)
Project Address/Location: 5000 Valley View Rd, El Sobrante, CA 94803 Project Owner / Contact / Telephone: West Contra Costa Unified School District - Magdy Abdalla, District Engineer - (510) 307-4540 Project Architect / Telephone: Schalleck Collaborative - Ian Hunter - [email protected] - (415) 576-0829 General Contractor / Telephone: Wright Contracting - Joe Grulich - [email protected] - (707) 528-1172 Scope of Work: ProTools Recording Studio/56 Classrooms Audio/Visual Initial Completion: November 2012
Actual Completion: November 2012
Initial Contract Value: $1,278,860.00
Final Contract Value: $1,278,610.00
Project Name: Westmoor HS (PCD #17004)
Project Address/Location: 131 Westmoor Avenue, Daly City, CA 94015 Project Owner / Contact / Telephone: Jefferson Union High School District - Stephanie Phillips - 650-550-7931 Project Architect / Telephone: Aedis Architects, June Yip, 408-300-5160 -worked with GC General Contractor / Telephone: Swinerton Builders - Cathy Lachenmyer - 408-454-2014 - [email protected] Scope of Work:
AV systems in Main Theater including mixer, Biamp dsp, racks with power conditioner, wireless mics, L'Acoustics speaker system, video system, short throw projector, cable TV, assisted listening system, intercom, and control system.
Initial Completion: 12/15/2021
Actual Date of Completion: 12/15/2021
Original Conntract Price: $1,110,883.00
Current Adjusted Contract Price $1,153,337.31
PCD Master List Projects
Largest Contracts in Past 10 years
DSA Approval Required: Yes
Project Name: Harker High School / Rothschild's PAC (PCD#16004) Project Address/Location: 500 Saratoga Avenue, San Jose, CA 95124 Project Owner / Contact / Telephone: The Harker School
Project Architect / Telephone: Studio Bondy Architecture (510) 836-6594 General Contractor / Telephone: Devcon Construction, Cameron Page, [email protected], 408-942-8200 Scope of Work:
Audio Visual Systems for Main Theatre (installation of a 34-foot by 15-foot LED video wall), Conference room, Medium Vocal Space, Large Vocal Space, Orchestra Room, Big Rehearsal room. Also installed AV in the main Gym, fitness room, training room, team room and boys and girls locker room Initial Completion: 4/27/2018
Actual Completion: 4/27/2018
Initial Contract Value: $757,838.00
Final Contract Value: $1,256,947.74
Project Name: CSU Monterey Bay Academic III Buildout (#19003) Project Address/Location: 3050 Divarty Street, Seaside, CA 93955 Project Owner / Contact / Telephone: Trustees of the California State University - Kathleen Ventimiglia - [email protected] - 831-582-4304 Project Architect / Telephone: WRNS Studio - Mitch Fine - [email protected] General Contractor / Telephone: Otto Construction - Nick Julo and Kevin Halfhill - [email protected], (916) 441-6870 Scope of Work:
AV systems throughout multiple classrooms, gallery, lecture rooms, conference rooms, cinema lab, screening & control rooms and digital signage in lobby
Initial Completion: 12/26/2019
Actual Completion: 12/26/2019
Initial Contract Value: $1,156,312.00
Final Contract Value: $603,863.00
Project Name: Milpitas Audio Visual Upgrades 2012 (#15023) Project Address/Location: 455 East Calaveras Blvd, Milpitas, CA 95035 Project Owner / Contact / Telephone: City of Milpitas - Julie Waldron, Project Manager - 408-690-3603 - [email protected] Project Architect / Telephone: n/a
General Contractor / Telephone: n/a - PCD
Scope of Work: Audio Visual upgrades to City Council Chambers and various additional rooms in City Hall Initial Completion: 9/6/2013
Actual Completion: 9/6/2013
Initial Contract Value: $946,650.00
Final Contract Value: $1,036,945.82
Project Name: CSU Chico Taylor II Replacement Building (PCD#14091) Project Address/Location: 121 Normal Avenue, Chico, CA 95928 Project Owner / Contact / Telephone: Cal State University Chico Project Architect / Telephone: WRNS Studio (415) 489-2224 General Contractor / Telephone: Otto Construction - Jose Carrasco (916)441-5870 - [email protected] Scope of Work:
In newly constructed Arts and Humanities building on campus, PCD provided extensive audio visual installations for the Recital hall, Recording Studio, Recording Classroom and Dance Rehearsal Space. The recital hall is equipped with an audio mixing console, digital signal processing and program paging, wireless microphone systems, wall mounted loudspeakers and power amplifiers for maximum performance. The recording studio, control room and classroom are equipped with a 48-channel state of the art mixing console, powerful studio grade monitoring loudspeakers, outboard recording, remote recording, digital matrix switching, control monitoring systems and studio furniture.
Initial Completion: 2/3/2016
Actual Completion: 2/3/2016
Initial Contract Value: $946,230.00
Final Contract Value: $1,014,185.00
Project Name: Palo Alto High School - Performing Arts Center (PAC-14)(PCD#14058) Project Address/Location: 50 Embarcadero Road, Palo Alto, CA 95301 Project Owner / Contact / Telephone: Palo Alto USD - Tom Hodges - (650)329-3927 - [email protected], [email protected] Project Architect / Telephone: Deems – Lewis – McKinley Architecture (415) 255-1811 General Contractor / Telephone: Alten Construction (408) 434-9300 Scope of Work: Audio/Visual System and Noise and Vibration Control – Performing Arts Center and Meyer Constellation System Initial Completion: 2/13/2016
Actual Completion: 2/13/2016
Initial Contract Value: $921,688.00
Final Contract Value: 1,013,383.00
Project Name: Pinole Valley HS Theater (Lathrop) (PCD#16008) Project Address/Location: 2900 Pinole Valley Road, Pinole, CA 94564 Project Owner / Contact / Telephone: West Contra Costa Unified School District -worked with Contractor Project Architect / Telephone: WLC Architects, 510-450-1999 General Contractor / Telephone:
Lathrop Construction Associates, Inc., Kyle Martellaro, 707-746-8000 ext. 134, [email protected] Scope of Work:
Installation of video projection system (large projection screens), large speaker arrays, ADA Assistive Listening Systems,production intercom systems, control systems - Crestron equipment and programming , and Digital Signal Processor.
Initial Completion: 1/30/2020
Actual Completion: 1/30/2020
Initial Contract Value: $960,672.00
Final Contract Value: $1,009,153.00
Project Name: Brentwood Community Center (#20879)
Project Address/Location: 150 City Park Way, Brentwood, CA 94513 Project Owner / Contact / Telephone: Yun Cho, CIO - 925-516-5104 - [email protected] Project Architect / Telephone: n/a
General Contractor / Telephone: n/a / PCD
Scope of Work:
PCD provided a design assist on the new city government complex including city council chambers, video conferencing meeting hall and park stage sound reinforcement system used for summer concerts for the community. All systems were provided and installed by PCD and, since the initial installation date, have been requested to provide and install additional add-on features and improvements to the initial design to enhance the facilities for meetings and events. This has turned out to be a great working relationship with the City of Brentwood and PCD.
Initial Completion: 8/16/2013
Actual Completion: 8/16/2013
Initial Contract Value: $944,109.00
Final Contract Value: $944,109.00
Project Name: Transbay Transit Center 2017-2018 (PCD #14148) Project Address/Location: 425 Mission Street, San Francisco, CA 94105 Project Owner / Contact / Telephone: Transbay Joint Power Authority Project Architect / Telephone: n/a
General Contractor / Telephone: Rail Services Corporation (504) 734-3773 Scope of Work: Installation of PA Equipment at Transbay Center Building and related structures Initial Completion: 8/30/2018
Actual Completion: 8/30/2018
Initial Contract Value: $1,019,991.00
Final Contract Value: $1,019,991.00
Project Name: Burbank Theatre Rehabilitation (PCD# 17124) Project Address/Location: 1501 Mendocino Ave, Santa Rosa, CA 95403 Project Owner / Contact / Telephone: Sonoma County Junior College District - Project Architect / Telephone: TLCD Architecture and Mark Cavagnero Associates General Contractor / Telephone: Wright Contracting - Steve McColloch - [email protected] - 707-528-1172 Scope of Work:
Complete overhaul of the Main Theater, Studio Theater, Rehearsal Space, Conference Room, Design Lab and Costume Shop & Makeup Lab. Top of the line AV equipment was chosen to match the standards SRJC students would expect to utilize if they remain in the AV industry for a long term career.
Initial Completion: 3/6/2020
Actual Completion: 3/6/2020
Initial Contract Value: $860,683.00
Final Contract Value: $851,726.00
Project Name: Novato HS Arts & Science Bldgs (PCD#19058) Project Address/Location: 625 Arthur Street, Novato, CA 94947 Project Owner / Contact / Telephone: Novato Unified School District , worked with electrical contractor , 415-897-4201 Project Architect / Telephone: WLC Architect, 510-450-1999 -worked with Electrical contractor General Contractor / Telephone: Ray Lunardi - 707-545-4755 - [email protected] Scope of Work:
AV installs in Main Theater including mixer, equipment racks, wireless mics, loudspeakers, video system, projector, overhead paging, Meyer Sound and Crestron control system.
Initial Completion: 6/1/2021
Actual Date of Completion: 6/1/2021
Original Conntract Price: $577,838.00
Final Contract Value: $647,058.21
DSA Approval Required: Yes
Project Name: San Mateo High School District & Performing Arts Center PCD (#Various) Project Address/Location: 600 N. Delaware St., San Mateo, CA 94401 Project Owner / Contact / Telephone: Greystone West (owner’s rep) Hugh Whelan - [email protected] - 707-933-0624 Project Architect / Telephone: Quattrocchi Kwok Architects (707) 576-0829 General Contractor / Telephone: Cahill Contractors (415) 986-0600 Scope of Work:
As a part of a large rehabilitation bond program, PCD was the selected contractor for multiple systems in various venues designed by The Shalleck Collaborative. Among them, PCD provided a reference standard AV system for the new Performing Arts Center that is also used by the community for multi-cultural events. The system utilizes the L’Acoustics line arrays for an outstanding sound system.
Initial Completion: 10/15/2014
Actual Completion: 10/15/2014
Initial Contract Value: $2,526,964.00
Final Contract Value: $2,526,964.00
Project Name: Berkeley HS Theatre Renovation (PCD#20099) Project Address/Location: 1930 Allston Way, Berkeley, CA 94704 Project Owner / Contact / Telephone: Berkeley Unified School District , 510-486-9338 Project Architect / Telephone: CAW Architects
General Contractor / Telephone:
Alten Construction Inc, Nick Matson, [email protected] , 510-234-420, [email protected] Jose Canseco main engineer
Scope of Work: Alten Construction Inc, Nick Matson, [email protected] , 510-234-420 Initial Completion:
Production intercom and paging system additions for existing theatre, new AV systems for Drama, Jazz, Orchestra, Choral, Music labs, and lobby video wall including a combination of projection and LCD flat panel displays.
Actual Date of Completion: 10/18/2023
Original Conntract Price: 10/18/2023
Final Contract Value: $499,988.00
DSA Approval Required: $508,627.21
38077.00180\29080232.10
-39- 00 52 13 – CONTRACT
00 52 13 – CONTRACT
This CONTRACT, No. 24-030 is made and entered on ____________ by and between City of Milpitas, sometimes hereinafter called “City,” and ________________________________________, sometimes hereinafter called “Contractor.” WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other as follows:
a. SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5, below, for the following Project:
24-030 COUNCIL CHAMBER AV SYSTEM REPLACEMENT
The Contractor and its surety shall be liable to the City for any damages arising as a result of the Contractor’s failure to comply with this obligation. b. TIME FOR COMPLETION. Time is of the essence in the performance of the Work. The Work shall be commenced on the date stated in the City’s Notice to Proceed. The Contractor shall complete all Work required by the Contract Documents within two hundred thirty-five (235) calendar days, in accordance with the pasing set forth in Exhibit “B” Phase #1 and #2 Time Schedule, from the commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is adequate and reasonable to complete the Work.
c. CONTRACT PRICE. The City shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs, the sum of ____________________________________________________________________ ____________________________________________________________________ Payment shall be made as set forth in the General Conditions. d. LIQUIDATED DAMAGES.In accordance with Government Code section 53069.85, it is agreed that the Contractor will pay the City the sum set forth in Section 00 73 13, Article 1.11 for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the City may deduct that amount from any money due or that may become due the Contractor under the Contract. This Article does not exclude recovery of other damages specified in the Contract Documents.
e. COMPONENT PARTS OF THE CONTRACT. The “Contract Documents” include the following:
Notice Inviting Bids
Instructions to Bidders
Bid Form
Bid Bond
Designation of Subcontractors
Information Required of Bidders
38077.00180\29080232.10
-40-
00 52 13 – CONTRACT
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor Registration Certification
Wage Theft Certification
Performance Bond
Payment (Labor and Materials) Bond
General Conditions
Special Conditions
Technical Specifications
Addenda
Plans and Drawings
Caltrans Standard Specifications, except Division 1
Caltrans Standard Plans
Applicable Local Agency Standards and Specifications, as last revised Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. This Contract shall supersede any prior agreement of the parties.
f.
PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE.
Each and
every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Work.
g.
INDEMNIFICATION.
Contractor shall provide indemnification and defense as set forth in the General Conditions.
h.
PREVAILING WAGES.
Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor Code which such rates shall be made available at the City’s Administrative Office or may be obtained online at http://www.dir.ca.gov and which must be posted at the job site.
i.
WAGE THEFT PREVENTION.
(a) Contractor, and any subcontractor it employs to complete work under this Contract, shall comply with all applicable federal, state and local wage and hour laws.
Applicable laws may include, but are not limited to, the Federal Fair Labor Standards Act, the California Labor Code and the Milpitas Minimum Wage Ordinance. (b) BY SIGNING THIS CONTRACT, CONTRACTOR AFFIRMS THAT IT HAS
DISCLOSED ANY FINAL JUDGMENTS, DECISIONS OR ORDERS FROM A COURT OR INVESTIGATORY GOVERNMENT AGENCY, FINDING IN THE FIVE (5) YEARS PRIOR TO
EXECUTING THIS CONTRACT THAT CONTRA
CTOR OR ITS SUBCONTRACTORS HAS
VIOLATED ANY APPLICABLE WAGE AND HOUR LAWS. CONTRACTOR FURTHER
AFFIRMS THAT IT OR ITS SUBCONTRACTOR(S) HAS EITHER FULLY SATISFIED EACH
38077.00180\29080232.10
-41-
00 52 13 – CONTRACT
JUDGMENT, DECISION OR ORDER, OR, IF
ANY JUDGMENT, DECISION OR ORDER HAS
NOT BEEN FULLY SATISFIED, CONTRACTOR AFFIRMS THAT IT OR ITS
SUBCONTRACTOR(S) IS CURRENTLY SATISFYING SAID JUDGMENT, DECISION OR
ORDER THROUGH A PAYMENT OR ALTERNATIVE PLAN APPROVED BY THE
APPLICABLE COURT/GOVERNMENT AGENCY AND THAT CONTRACTOR OR ITS
SUBCONTRACTOR(S) ARE IN COMPLIANCE WITH SAID PLAN AS OF THE DATE OF EXECUTING THIS CONTRACT.
(c) If at any time during the term of this Contract, a court or investigatory government agency issues a final judgment, decision or order finding that Contractor or a subcontractor it employs to perform work under this Contract has violated any applicable wage and hour law, or Contractor learns of such a judgment, decision, or
order that was not previously disclosed in its
bid/proposal, Contractor shall inform the City no more than fifteen (15) calendar days after the judgment, decision or order becomes final or from the date of learning of the final judgment, decision or order. Contractor or its subcontractor(s) shall, within thirty (30) calendar days after notifying the City, either (i) fully satisfy any such judgment, decision, or order and provide the City with documentary evidence of satisfying said judgment, decision or order; or (ii) provide the City documentary evidence of a payment or other alternative plan approved by the court/government agency to satisfy the judgment, decision or order. If the Contractor or its subcontractor is subject to a payment or other alternative plan, the Contractor or its subcontractor shall continue to submit documentary evidence every thirty (30) calendar days during the term of the Contract demonstrating continued compliance with the plan until the judgment, decision or order has been fully satisfied.
(d) For purposes of this Section, a "final judgment, decision, or order" refers to one for which all appeals have been exhausted or the time period to appeal has expired. Relevant investigatory government agencies include: the United States Department of Labor, the California Division of Labor Standards Enforcement, the City, or any other governmental entity or division tasked with the investigation and enforcement of wage and hour laws. (e) Failure to comply with any part of this Section constitutes a material breach of this Contract. Such breach may serve as a basis for immediate termination of this Contract and/or any other remedies available under this Contract and/or law. (f) Notice provided to the City shall be addressed to: Attention: Finance Director, 455 E. Calaveras Blvd. Milpitas, CA 95035. The Notice provisions of this Section are separate from any other notice provisions in this Contract and, accordingly, only notice provided to the above address satisfies the notice requirements in this Section. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
38077.00180\29080232.10
-42-
00 52 13 – CONTRACT
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on the day and year above written.
CITY OF MILIPITAS [INSERT NAME OF CONTRACTOR]
By By:
Ned Thomas , City Manager
Its:
Printed
Name:
(CONTRACTOR’S SIGNATURE MUST BE
NOTARIZED AND CORPORATE
SEAL AFFIXED, IF APPLICABLE)
A
PPROVED AS TO FORM:
By:
Michael Mutalipassi, City Attorney
END OF CONTRACT
38077.00180\29080232.10
-43-
00 52 13 – CONTRACT
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of t
he individual who signed the
document to which this certif
icate is attached, and not the
truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _____________________
__________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER
DESCRIPTION OF ATTACHED DOCUMENT