February 24, 2026 Milpitas City Council Agenda Page 1
SPECIAL MEETING OF THE MILPITAS
CITY COUNCIL
AGENDA
TUESDAY, FEBRUARY 24, 2026
BARBARA LEE SENIOR CENTER COMMUNITY ROOM,
40 N MILPITAS BLVD, MILPITAS, CA
5:00 PM
For assistance in the following languages, you may call:
Đối với Việt Nam, gọi 408-586-2400
Para sa Tagalog, tumawag sa 408-586-3051
Para español, llame 408-586-3072
* To access written translation during the meeting, scan the QR Code.
The City Council meeting is held in the Barbara Lee Senior Center Community Room, 40 N Milpitas Blvd., Milpitas and via teleconference/Zoom webinar.
You may watch the Council meeting without providing public comment by accessing it via links here.
Meeting shall be livestreamed - Go to:
Facebook: https://www.facebook.com/CityofMilpitas/
YouTube: https://www.milpitas.gov/youtube
Web Streaming: https://www.milpitas.gov/webstreaming
PUBLIC COMMENT INSTRUCTIONS
Oral public comments may only be provided live during the City Council meeting in person, unless the City Council approves remote public comment. All comments provided shall be limited to three minutes or less as determined by the Mayor. All members of the public will be limited to one comment per agenda item, and one comment for non-agenda items. Members of the public may submit written comments by email to [email protected]
The meeting will be streamed via Zoom for viewing purposes only unless the City Council approves remote public comment. To watch via Zoom, please register at:
https://ci-milpitas-ca-gov.zoom.us/webinar/register/WN_KNAi_fI-TSej6s3vZ6X12A NOTE: If a member of the public wishes to share any presentation materials for Council consideration, they must be submitted to the Clerk’s Office by email to [email protected] by 12:00 p.m. on the day of the meeting. No presentations will be accepted in person in the Council Chambers.
MILPITAS CITY COUNCIL CODE OF CONDUCT
• Be respectful and courteous (words, tone, and body language). • Model civility.
• Avoid surprises.
• Praise publicly and criticize privately.
• Focus on the issue, not the person.
• Use electronic devices appropriately while on the Council dais. • Disclose conflicts of interest and affiliations related to agenda items. • Separate governing from campaigning.
• The Council speaks with one voice after making policy on issues. • Respect the line between policy and administration.
• Council will hold one another accountable to comply with this Code of Conduct.
February 24, 2026 Milpitas City Council Agenda Page 2
CALL MEETING TO ORDER by Mayor and ROLL CALL by City Clerk (5:00 PM)
PLEDGE OF ALLEGIANCE
PUBLIC FORUM
Members of the public are invited to speak on items listed on today’s agenda only. Comments will be limited to three minutes or less at the Mayor’s discretion. When called to speak, you are encouraged to state your name for the record.
ANNOUNCEMENT OF CONFLICT OF INTEREST AND CAMPAIGN CONTRIBUTIONS
READING OF THE CITY COUNCIL CODE OF CONDUCT
APPROVAL OF AGENDA
AGENDA ITEMS
1. Receive Presentation on the Proposed Five-Year 2027-2031 Capital Improvement Program and Fiscal Sustainability Initiatives, and Provide Feedback to Staff (Staff Contact: Michael Silveira, City Engineer, 408-586-3303; and Matt Cano, Assistant City Manager, 408-586-3012) Recommendation: (1) Receive presentation on the Proposed Five-Year 2027-2031 Capital Improvement Program; (2) Receive report on Fiscal Sustainability Initiatives; (3) Provide feedback to staff; and (4) Find a CEQA exception.
ADJOURNMENT
KNOW YOUR RIGHTS UNDER THE OPEN GOVERNMENT ORDINANCE
Government’s duty is to serve the public, reaching its decisions in full view of the public. Commissions and other City agencies exist to conduct the people’s business. This ordinance assures that deliberations are conducted before the people and City operations are open to the people’s review. For more information on your rights under the Open Government Ordinance or to report a violation, contact the City Attorney’s office at Milpitas City Hall, 455 E. Calaveras Blvd., Milpitas, CA 95035 e-mail: [email protected] / Phone: 408-586-3040
The Open Government Ordinance is codified in the Milpitas Municipal Code as Title I Chapter 310 and is available online at the City’s website www.milpitas.gov by selecting the Milpitas Municipal Code link.
Materials related to an item on this agenda submitted to the City Council after initial distribution of the agenda packet are available for public inspection at the City Clerk’s office at Milpitas City Hall, 3rd floor 455 E. Calaveras Blvd., Milpitas and on City website. City Council agendas and related materials can be viewed online: www.milpitas.gov/government/council/agenda_minutes.asp (select meeting date)
APPLY TO SERVE ON A CITY COMMISSION
Commission application forms are available online at www.milpitas.gov or at Milpitas City Hall.
Contact the City Clerk’s Office at 408-586-3005 for more information.
If you need assistance, per the Americans with Disabilities Act, for any City of Milpitas public meeting, please call the City Clerk at 408-586-3001 or send an e-mail to [email protected] prior to the meeting. You may request a larger font agenda.
CITY OF MILPITAS
AGENDA REPORT
(AR)
Item Title: Receive Presentation on the Proposed Five-Year 2027-2031 Capital Improvement Program, and Provide Feedback to Staff (Staff Contact: Christian Di Renzo, Public Works Director, 408-586-2602; and Michael Silveira, City Engineer, 408- 586-3303)
Category: Community Services and Sustainable Infrastructure Meeting Date: 2/24/2026
Recommendation: (1) Receive presentation on the Proposed Five-Year 2027-2031 Capital Improvement Program; (2) Receive report on Fiscal Sustainability; (3) Provide feedback to staff; and (4) Find a CEQA exception.
BACKGROUND:
The City plans and budgets for its capital improvement projects through the annual five-year Capital Improvement Program (CIP), which is developed by the Public Works Department and in close collaboration with other departments. The CIP process customarily begins in October with the Call-for-Projects and concludes in May, following a Public Hearing and City Council adoption of the annual five-year CIP.
The CIP is a comprehensive budgeting and planning tool for projects that repair, replace, and improve City facilities, parks, streets, and utilities infrastructure. It identifies priorities, schedules, estimated costs, funding sources and any financing necessary for delivering critical services and infrastructure for the Milpitas community. The CIP is organized by the following six categories: Community Improvement, Parks, Streets, Water, Sewer, and Storm Drain.
The projects in the first year of any proposed five-year CIP are recommended for funding while projects in the subsequent four years may be recommended for partial funding based on estimated available funds. Capital project funding accounts are made up of funds that help organize and account for restricted resources. A fund is defined as a fiscal accounting entity with a self-balancing set of accounts (comprised of assets, liabilities, fund equity, revenues, and expenditures), which are segregated for the purpose of carrying out specific activities or attaining certain objectives in accordance with regulatory requirements.
Projects prioritized by the City Council through the quarterly city council prioritization process that may need capital funding to complete are summarized in the “City Council Referral” section of this report. Additionally, staff will provide a brief presentation to the Mayor and City Council on fiscal sustainability initiatives.
ANALYSIS:
The proposed 5-year CIP budget is $206.1 million while the proposed project funding for FY 2026-27 totals $35.7 million. As indicated in Table 1, the FY 2026-27 proposed funding includes contributions from the Street Funds ($8.4 million), TASP Impact Fee ($11.1 million), Sewer Fund ($6.8 million), Water Fund ($3.6 million), General Government CIP Fund ($1.6 million), Park Fund ($1.1 million), Storm Drain Fund ($300,000), and Other Funds ($2.8 million).
Proposed FY 2026-27 Capital Improvement Investments
Major projects proposed to be funded for FY 2026-27 include:
Project Description
Recommended
Funding
Amount
Funding Source
Construction of Metro Tango Subdistrict Park $10,600,000 TASP Impact Fee
Project Description
Recommended
Funding
Amount
Funding Source
Design and construction of the Street Resurfacing Project 2027
$4,816,109 Gas Tax, Measure B, SB1,
Vehicle Registration Fee,
City capital contribution to the San José-Santa Clara
Regional Wastewater Facility
$4,509,000 Sewer Infrastructure Fund
Construction for the 1st phase of water main upgrades as identified in the Water Master Plan
$2,005,000 Water Capital Surcharge
Design and construction for HSIP Grant Traffic Safety
Improvements
$1,911,800 Grant and Gas Tax
Streetlight, Signage, & Traffic Signal Improvements $1,000,000 Gas Tax Pathway improvements at various Parks $1,000,000 Park Fund Construction for the 1st phase of sewer main upgrades
as identified in the Sewer Master Plan
$730,000 Sewer Infrastructure Fund
Funding for the roadway preservation program $700,000 Gas Tax Funding for the annual sidewalk repair program $600,000 Gas Tax Design and construction of signal improvements along
Main Street
$500,000 Grant
Installation of Real-Time Monitoring Center $325,000 General Gov’t CIP Construction of the large dog park at Delano Manongs
Park
$301,516 Grant
Design for the replacement of sport field turf at Delano Manongs Park
$300,000 TASP fee
Various repairs, rehabilitation or replacement projects and programs managed by the Information Technology,
Planning, Public Works, and Recreation & Community
Services Departments
$6,477,400 TASP fee, General Gov’t
CIP, Information
Technology Replacement,
LLMD, Park Fund, Public
Art Fund, Sewer
Infrastructure Fund; Water
Capital Surcharge, Water
Line Extension Fund.
Scope and funding changes to existing projects and new projects requested by departments are reviewed, prioritized, and ranked by the Public Works and Finance Departments for conformance with Council priorities, available funding, and resources. Ranking criteria include immediate health and safety concerns, any available grant funding, City Council referrals, enhancements yielding operational efficiencies, legal mandate obligations, departmental resources, project schedule, funding sources, and impact to the operating budget. Following this review, the prioritized and ranked project list is discussed with the City Manager’s Office for recommendation to City Council.
Table 1: Summary of Funding for projects funded in FY 2026-27
Category
Funding Sources
Community Park Street Water Sewer Storm
Drain
Grand
Total
TASP Impact Fees $153,900 $10,900,000 $0 $0 $0 $0 $11,053,900 Sewer Infrastructure Fund $172,000 $0 $0 $0 $6,652,000 $0 $6,824,000 Gas Tax Fund $0 $0 $3,661,180 $0 $0 $0 $3,661,180
Water Capital Surcharge $172,500 $0 $0 $3,225,000 $0 $0 $3,397,500 Grants/ Developer Fees $0 $301,516 $2,220,620 $0 $0 $0 $2,522,136 Measure B $0 $0 $2,135,109 $0 $0 $0 $2,135,109
SB1 RMRA $0 $0 $2,000,000 $0 $0 $0 $2,000,000
Category
Funding Sources
Community Park Street Water Sewer Storm
Drain
Grand
Total
General Gov’t CIP Fund $1,657,000 $0 $0 $0 $0 $0 $1,657,000 Park Fund $0 $1,100,000 $0 $0 $0 $0 $1,100,000
Vehicle Registration Fee $0 $0 $500,000 $0 $0 $0 $500,000 Storm Drain General Fund $0 $0 $0 $0 $0 $300,000 $300,000 Water Line Extension Fund $0 $0 $0 $200,000 $0 $0 $200,000 IT Replacement Fund $146,000 $0 $0 $0 $0 $0 $146,000
TDA Article III $0 $0 $80,000 $0 $0 $0 $80,000
Public Art Fund $55,000 $0 $0 $0 $0 $0 $55,000
Equipment Replacement
Fund $48,500 $0 $0 $0 $0 $0 $48,500
LLMD $0 $0 $20,000 $0 $0 $0 $20,000
Grand Total $2,404,900 $12,301,516 $10,616,909 $3,425,000 $6,652,000 $300,000 $35,700,325
Proposed FY 2027-2031 Capital Improvement Program
The proposed 2027-2031 CIP in the amount of $206.1 million is only partially funded and the funding sources identified in the last four years (2028-2031) are based on projected available funding, which is subject to annual fluctuations. The estimated value of City infrastructure needs requiring unidentified additional funding is $22.6 million over the four years, representing 11% of the total proposed budget. Projects needing funding in the outyears are mostly for ongoing infrastructure repairs, rehabilitation or replacement projects such as the Community Center Roof Renovation ($4.0M), Citywide Park Rehabilitation ($2.4M), Sandalwood Park Renovation ($2.2M), City Building Improvements ($2.0M), City Building Roof Improvements ($1.65M), On-Call Facilities Maintenance & Repair Services ($1.6M), and City Buildings HVAC System Improvements ($600k).
Through work completed in the various master plans for parks, water, sewer, stormwater, trail, pedestrian and bicycle, as well as assessments of facilities and traffic safety, staff has identified $634.1 million of needed capital improvements beyond the 5-year capital budget. These projects will need to be funded through a combination of possible utility rate adjustments, impact fees, General Fund, grants, and other funding sources such as a general obligation bond or other financing instruments. The following is a summary of capital funding needs beyond the proposed five-year CIP.
• Approximately $220.8 million is for ongoing infrastructure repairs, rehabilitation, or replacement projects.
o $96.3 million of this funding has no clear funding source identified, such as improvements to the City’s park system ($5.7M), storm drain system ($57.8M), Fire Station No.1 Building and Site Improvements ($7M), and Fire Station No. 3 Replacement ($20.0M). • Approximately $413 million is for new infrastructure projects. o Examples of these projects are a new facility for the Police and Information Technology Department and renovation of the existing building for the Public Works Department ($200M); improvements of City bicycle, pedestrian, and trail networks identified in the adopted Trail, Pedestrian, and Bicycle Master Plan ($94.2M); renovations of the City’s Parks as recommended in the adopted Parks and Recreation Master Plan ($65.5M); Montague Expressway Widening west of Great Mall Parkway ($20.2M) and Montague Pedestrian Overcrossing at Penitencia ($21.5M) as identified in the Basic Infrastructure Project list of the TASP Specific Plan; and Traffic Safety Improvements ($7.5M) as identified in the adopted Travel Safety Plan. o Recommended improvements identified in the Milpitas Metro and Main Street/Gateway Specific Plans will be forthcoming in 2026 for City Council consideration. It is expected that a portion of these improvements will be funded through a combination of impact fees and grants. However, significant additional funding will need to be identified for the remainder.
In summary, as shown in Table 2, the City has approximately $656.8 million of unfunded infrastructure needs, where $239.2 million is estimated for infrastructure replacements and $413.2 million is for new infrastructure. It is anticipated that 47% ($115.6M) of the infrastructure replacement needs could be funded through renewal of rates for sewer and water infrastructure. Additionally, it is expected that a portion of the new infrastructure needs will be funded through development fees and/or grants. However, this still leaves a substantial backlog of infrastructure that needs to be repaired and/or replaced as well as new infrastructure. As we move forward, it will be critical to focus on (1) identifying new revenues sources to repair the City’s aging infrastructure, and (2) maintaining fiscal discipline by prioritizing available funding on infrastructure repair and replacement, whenever possible, as opposed to new amenities.
Additionally, it should be noted as a result of the recent completion of master planning work for the City’s parks and utilities (sewer, storm, and water), the infrastructure needs in these master plans have a high degree of certainty. However, additional assessments will need to be performed in the coming years to identify infrastructure needs for the City’s buildings and other public right-of-way. This additional analysis may lead to an increase in the infrastructure backlog needs in the next reporting period.
Table 2: Summary of Unfunded Infrastructure Repairs/Replacement Needs and New Infrastructure Projects
Unfunded Infrastructure
Repair/Replacement Needs
Unfunded New
Infrastructure Projects
Total
5-Year Budget $22,658,000 - $22,658,000
Beyond 6 Years $220,880,000 $413,270,000 $634,150,000
Total $243,538,000 $413,270,000 $656,808,000
Given the current available funding and staffing resources, staff will continue to focus the Capital Improvement Program on essential and safety-oriented projects such as miscellaneous building improvements to maintain facilities in a safe and functioning condition; City technology systems projects to improve security, operational efficiency, and community interface; safety-oriented projects; and projects to improve parks, streets, and utilities.
2027-2031 Capital Improvement Study Session
At the Study Session, staff will present highlights of the proposed 2027-2031 CIP to the City Council for review and feedback. The presentation will include four main sections:
• Accomplishments
Key CIP projects that were either completed or reached a major milestone in Fiscal Year 2025-2026.
• Workplan
Outline key CIP projects that are anticipated to be initiated or completed in Fiscal Year 2026-2027.
• Proposed 2027-2031 Capital Improvement Program
Present the proposed 2027-2031 CIP document, CIP projects, discussion and recommendations for new and proposed funding of projects for FY2026-2027.
• City Council Referrals
Projects prioritized by the City Council through the quarterly city council prioritization process that may need capital funding to complete are summarized in the “City Council Referral” section of this report.
The table below summarizes City Council referrals requests for consideration in the 2027-2031 CIP and total estimated funding need for FY 2026-27.
Topic Status Next Steps For CIP
Items previously prioritized by Council or continuing Council direction:
Funding already allocated for the item in the CIP
Mural art on Great Mall
Parkway on the VTA
owned light rail pillars
• Per City Council consensus on
11/16/2021, staff to explore incorporating
a mural on two VTA pillars along Great
Mall Parkway at McCandless Drive.
• In accordance with the City Public Art
Policy, a Public Arts Selection Committee
has been established to select an artist.
• Effective 1/1/26, a new law- SB456
exempt local artists from requiring a
contractor's license.
• Artist submitted final proposals in January,
and evaluation of their proposals were
completed on February 18.
• Contract is anticipated to be executed
in April to begin the work.
• Murals are anticipated to be completed
by fall 2026.
Police Satellite Office on
South Main Street
• Per City Council consensus on
2/18/2025, open a police satellite office at
the City-own properties on Main Street.
• Staff completed a conditional assessment
and identified repairs and improvements.
• On 12/2/25, City Council allocated $310k
for building tenant improvements.
• Work is anticipating to start in the
latter part of 2026 and construction is
anticipated to take up to 12 months.
• The office is planned to be included in
the future housing development at
Main Street properties.
Escuela Parkway Traffic
Safety Review
• Per City Council consensus on 6/11/2024,
conduct a traffic study along Escuela
Pkwy from Jacklin Rd. to Washington St.
• In October 2025, the consultant provided
a draft memorandum including findings of
the existing conditions and identified
potential mitigation measures to alleviate
traffic congestion.
• Findings and potential mitigation
measures were presented to the
Transportation Subcommittee on 11/19/25
and to MUSD on 1/9/26.
• Staff has coordinated with the Police
Department to improve cross-guard
operations and enforce random parking
restrictions within bike lanes; and
collaborated with MUSD on outreach
about designed drop off/pick-up.
• Staff is developing a workplan for
public outreach, and circulation and
safety improvements. Implementation
is anticipated prior to start of the next
school year, pending feedback from
MUSD and public.
• Workplan for mid- to long-term
mitigation measures are being
developed to present to MUSD, City
Council, VTA for future discussion and
consideration.
Topic Status Next Steps For CIP
Main Street Infrastructure
Projects
• Projects are contingent on approval of
future development and Main St. Sense of
Place Plan, and the establishment of
impact fees for the Gateway Specific Plan.
➢ Installation of decorative streetlights
from Carlo Street to Great Mall
Parkway is estimated at $7.9 million.
➢ Undergrounding overhead utility lines
from Corning Ave. and Curtis Ave. is
estimated at $1.5 million. Staff is
working with PG&E on right-of-way
acquisition and refinement of the
design.
• The City was selected to receive a federal
earmark of $250k for safety improvements
along Main St. in 2025; however, the
federal government has not passed a bill
allocating this funding, as of yet and this
remains at risk.
• The City received $500k in a federal
earmark for streetlight and traffic signal
improvements on Main St., a portion of the
$3M request, which is insufficient to
complete all planned improvements.
➢ In Fall 2025, MTC approved the
workplan to upgrade pedestrian and
traffic equipment at five signalized
intersections on Main Street,
consistent with the intent of the
earmark funding request.
• For Main St. Signal Improvement
Project, staff is currently working on
Caltrans E-76 approval that includes
environmental, right-of-way, and utility
clearances and design specifications.
The E-76 package must be submitted
to Caltrans by spring 2027 to ensure
the funding is obligated by September
30, 2027.
• Construction must be completed by
September 30, 2030.
Items previously approved by Council or continuing Council direction:
Funding not recommended to be included in Proposed CIP
Pickleball Pilot Project
• Per City Council consensus on 1/25/2022,
initiate a pilot project at Gill and Hall
Parks.
• On 3/19/2024, City Council provided
feedback and direction to staff.
• As part of adopted 2024-28 CIP, City
Council approved Pickleball
Improvements, CIP No. 5116 with an
allocation of $100k from the Park fund.
• In November 2024, staff completed the
installation of safety fencing and sound
dampening panels, and performed
maintenance of the courts.
• On May 20, 2025, the City Council
approved staff-recommended
improvements at Hall Park, allocated
$100k from the Park Fund into CIP No.
5116, and directed staff to explore and
analyze public and private opportunities
throughout the City.
• Staff completed the improvements at Hall
Park in November 2025 and the analysis
of other possible locations in February
2026.
• The analysis will be circulated to City
Council for review in March.
Topic Status Next Steps For CIP
Main Street Flooding at
Library
• Per City Council consensus on 2/28/2023,
conduct assessment of the flooding on
Main St., near the Library.
• Staff have coordinated with the Regional
Water Board to obtain a permit for
dredging and vegetation management at
Ford Creek and will continue this effort.
• In 2024, the weir wall was lowered at the
Wrigley Ford Pump Station with
minimal benefit.
• As part of the adopted 25-29 CIP, City
Council approved Main Street Flood
Study, CIP No. 3724 with a funding
allocation of $500k from the Storm Drain
Fund to provide an assessment and
recommendations to mitigate the flooding.
• In Fall 2025, the consultant completed
assessment and identified potential
improvements to increase storage
capacity are estimated between $2.6M to
$2.8M.
• Currently, funding is not available to
implement the recommended
improvements. Staff will continue to
explore funding opportunities and
partnerships.
• Staff will continue to perform
preventative maintenance ahead of
anticipated storm events to minimize
flooding impacts.
Next Steps:
Following the Study Session, City Council feedback will be incorporated into the proposed 2027-31 CIP document. In accordance with the California Government Code Section 65401, the Planning Commission will review the proposed CIP document for conformance with the City’s General Plan on March 25, 2026.
Additionally, as part of the review process, staff will present the Parks section of the proposed CIP document to the Parks, Recreation and Cultural Resources Commission (PRCRC) for review and recommendation on April 6, 2026.
Staff will present any revisions to the proposed 2027-2031 CIP document to the City Council for consideration on May 5, 2026. Proposed funding actions for the first year of the 2027-2031 CIP document will be presented for Council consideration as part of the approval of the FY2026-27 Adopted Budget scheduled for June 2, 2026.
FISCAL IMPACT:
The proposed 2027-2031 Capital Improvement Program recommends funding 39 projects in the amount of $35,700,325 for FY2026-27 to address repairs and improvements to City infrastructure from various funding sources as shown in the table below.
Funding Sources
FY2026-27 Proposed
Recommended Funding
Projected Fund
Balance at the end of
FY2025-26
Remaining Fund
Balance
TASP Impact Fees $11,053,900 $57,447,086 $46,393,186
Sewer Infrastructure
Fund $6,824,000 $38,627,401 $31,803,401
Gas Tax Fund $3,661,180 $4,599,930 $938,750
Water Capital
Surcharge $3,397,500 $3,397,500 $0
Grants/ Developer Fees $2,522,136 - -
Measure B $2,135,109* - -
SB1 RMRA $2,000,000* - -
General Gov’t CIP Fund $1,657,000 $1,705,895 $48,895
Park Fund $1,100,000 $1,401,378 $301,378
Vehicle Registration Fee $500,000* - -
Funding Sources
FY2026-27 Proposed
Recommended Funding
Projected Fund
Balance at the end of
FY2025-26
Remaining Fund
Balance
Storm Drain General
Fund $300,000 $1,873,701 $1,573,701
Water Line Extension
Fund $200,000 $5,465,134 $5,265,134
IT Replacement $146,000 $146,290 $290
TDA Article III $80,000 - -
Public Art Fund $55,000 $1,217,854 $1,162,854
Equipment
Replacement Fund $48,500 $11,665,452 $11,616,952
LLMD $20,000** - -
Grand Total $35,700,325 $124,150,121 $99,104,541
*Projected fund allocations from the County or State for FY2026-27 ** Annual contribution from LLMD Budget for future improvement project(s)
After the adoption of the 2027-2031 Capital Improvement Plan scheduled for May 5, 2026, the appropriation actions to fund FY2026-27 projects will be included in the adoption of the FY2026-27 Budget anticipated to occur on June 2, 2026.
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA):
The City Council’s receipt of a presentation is not a discretionary action subject to the California Environmental Quality Act (CEQA). Further, even if this action was deemed to be a discretionary action, the City Council’s action in receiving the report is exempt from CEQA pursuant to CEQA Guideline 15061(b)(3) as it can be seen with certainty that the City Council’s input on the CIP does not have the potential to cause a significant effect on the environment as it does not involve the approval of any CIP project. Further, this action is also exempt pursuant to CEQA Guideline 15378(b)(4) as a governmental fiscal activity which does not involve any commitment to any specific project. Although the CIP does include various projects, the City is not mandated to move forward with any project, and at the time of any project approval, CEQA review will be considered.
ATTACHMENT(S):
(a) Proposed Five-Year 2027-2031 Capital Improvement Program
1
2 Table of
Contents
Capital Improvement Program Grand Summary
................................
................................
...............
4 Capital Improvement Program Grand Summary
................................
................................
...............
5 Proposed New Projects FY 2027
-
31 ................................
................................
................................
.
7 Proposed Projects with InsuƯicient or No Funding
................................
................................
............
9 Projects Proposed To Be
Closed as of June 30, 2026
................................
................................
.......
11 Projects Proposed To Be Funded as of July 1, 2026
................................
................................
.........
12 Community Improvement
................................
................................
................................
...........
17 2027
-
31 Summary of Estimate Costs
................................
................................
.............................
18 Land/Right
-
of
-
Way Value Determination
................................
................................
....................
20 City Buildings Exterior Improvements
................................
................................
.........................
21 On
-
Call Facilities Maintenance & Repair Services
................................
................................
.......
22 End
-
User Computer Replacement
................................
................................
.............................
23 Public Art Program
................................
................................
................................
....................
24 Capital Improvement Program Administration
................................
................................
............
25 City Building’s HVAC System Improvements
................................
................................
...............
26 Real
-
Time Monitoring Center
................................
................................
................................
.....
27 Park Improvement
................................
................................
................................
......................
28 2027
-
31 Summary of Estimate Costs
................................
................................
.............................
29 Metro Tango Subdistrict Park
................................
................................
................................
.....
30 On
-
Call Parks and Landscaping Services
................................
................................
...................
31 Delano Manongs Park
................................
................................
................................
...............
32 Delano Manongs Soccer Field Turf Replacement
................................
................................
........
33 Parks Pathway Improvement
................................
................................
................................
.....
34 Street Improvement
................................
................................
................................
...................
35 2027
-
31 Summary of Estimate Costs
................................
................................
.............................
36 Sinclair LLMD 98
-
1 Improvements
................................
................................
.............................
38 Annual Sidewalk Repair Program
................................
................................
...............................
39 Streetlight, Signage, TraƯic Signal Improvements
................................
................................
........
40 ADA Curb Ramp Transition Program
................................
................................
...........................
41
3 TraƯic Studies & Safety Improvements
................................
................................
.......................
42 Street Pavement
Restriping Program
................................
................................
..........................
43 Bike and Pedestrian Outreach
................................
................................
................................
...
44 Street Resurfacing Project 2026
-
27 ................................
................................
............................
45 Street Resurfacing Project 2027
-
28 ................................
................................
............................
46 HSIP TraƯic Safety Improvement
................................
................................
................................
47 Main Street Signal Improvements
................................
................................
..............................
48 Roadway Preservation Program
................................
................................
................................
.
49 Water Improvement
................................
................................
................................
...................
50 2027
-
31 Summary of Estimate Costs
................................
................................
.............................
51 Hydrant Replacement Program
................................
................................
................................
..
53 On
-
Call Water Maintenance & Repair Services
................................
................................
...........
54 Pipeline & Facility Condition Assessment
................................
................................
...................
55 Fire Flow
Interconnection Improvements
................................
................................
...................
56 Fire Flow Pipeline Improvement Phase 1
................................
................................
....................
57 Fire Flow Pipeline Improvement Phase 2
................................
................................
....................
58 Sewer Improvement
................................
................................
................................
...................
59 2027
-
31 Summary of Estimate Costs
................................
................................
.............................
60 SJ/SC Regional Waste Water Facility
................................
................................
..........................
61 Sewer Pump Station Rehabilitation Program
................................
................................
...............
62 On
-
Call Sewer Maintenance & Repair Services
................................
................................
...........
63 Sanitary Sewer Pipeline Improvements
................................
................................
......................
64 Sanitary Sewer Pipeline Improvement Phase 1
................................
................................
............
65 Sanitary Sewer Pipeline Improvement Phase 2
................................
................................
............
66 Storm Improvement
................................
................................
................................
...................
67 2027
-
31 Summary of Estimate Costs
................................
................................
.............................
68 On
-
Call Storm Maintenance & Repair Services
................................
................................
...........
69 Citywide Green Infrastructure Improvement
................................
................................
...............
70 Planned Projects Without Funding
................................
................................
..............................
71
4 C
apital Improvement Program Grand Summary
Project Expenses
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Community Improvement
2,
404
,900
9,464,900
3,224,900
2,774,900
2,774,900
20,
644,500
Park Improvement
12,301,516
4 ,600,000
850,000
850,000
850,000
19,451,5
16 Street Improvement
10,
6 16,909
8,595,000
8,045,000
7,195,000
8,045,000
42,
496,909
Water Improvement
3,425,000
7,
927,000
9,275,000
6,775,000
15,182,000
42,584,000
Sewer Improvement
6,652,000
37,295,000
4,306,000
17,290,000
12,882,000
78,425,000
Storm Drain Improvement
300,000
2,199,843
0 0
0 2,499,843
Total
$3
5,
700,325
$
70 ,
081,743
$
2 5,7
00 ,900
$3
4 ,
884
,900
$3
9,733
,900
$
206,
1 01
,
768
Project Expenses
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Equipment Replacement Fund
48,500
0 0
0 0
48 ,500
Gas Tax Fund
3,
661,180
2,
220
,000
3,170,000
2,320,000
3,170,000
14,541,180
General Government CIP Fund
1,657,000
0 0
0 0
1,657,000
Information Technology
Replacement
146,000
215
,000
515,000
215,000
215,000
1,006,000
LLMD
20,000
95,000
95,000
95,000
95,000
400,000
Measure B
2,135,109
1,950,000
1,950,000
1,950,000
1,950,000
9,935,109
Park Fund
1,100,000
0 0
0 0
1,100,000
Public Art Fund
55,000
55,000
55,000
55,000
55,000
275,000
SB1 RMRA
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
10,000,000
Sewer
Infrastructure Fund
6,824,000
17,457,000
4,468,000
17,452,000
13,044,000
59,245,000
Storm Drain Fund
0 1,799,843
0 0
0 1,799,843
Storm Drain General Fund
300,000
400,000
0 0
0 700,000
TASP Impact Fees
11,053,900
2,893,900
153,900
3,953,900
11,715,900
29,271,500
TDA Article III
80,000
80,000
80,000
80,000
80,000
400,000
Vehicle Registration Fee
500,000
500,000
500,000
500,000
500,000
2,500,000
Water Capital Surcharge
3,397,500
7,
889,000
9,237,000
2,937,000
3,582,000
27,042,500
Water
Line Extension Fund
200,000
200,000
200,000
200,000
200,000
1,000,000
Sub
Total
$
33,
178,189
$
37,254,743
$
2 2
,
123,900
$
31,
757,900
$
36,606,900
$
160,
921,632
External Financing
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Grants/Reimb./
Developer Fee
2,522,136
0 0
0 0
2,522,136
Wastewater Revenue Bonds
0 20,000,000
0 0
0 20,000,000
Sub Total
$2,522,136
$20,000,000
$0
$0
$0
$
22,522,136
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
No Funding Source
0 12,827,000
3,577,000
3,127,000
3,127,000
22,658,000
Total
$
35,
700,325
$
70,
081,743
$
2 5,700,900
$
34,884,900
$
3 9,733,900
$
206,
101,768
5 Capital Improvement Program Grand Summary
Five
-
Year Expenditure by Category for FY 2027
-
31 Expenditure by
Category for FY2026
-
27 Community
Improvement
10%
Street Improvement
21%
Park Improvement
9%
Water Improvement
21%
Sewer Improvement
38%
Storm Drain
Improvement
1%
Community
Improvement
7%
Street Improvement
30%
Park Improvement
34%
Water Improvement
9%
Sewer Improvement
19%
Storm Drain
Improvement
1%
6 Funding Sources for FY 2026
-
27 Number of Projects Funded by Category for FY 2026
-
27 $200,000.00
$3,397,500.00
$500,000.00
$80,000.00
$11,053,900.00
$300,000.00
$6,824,000.00
$2,000,000.00
$55,000.00
$1,100,000.00
$2,135,109.00
$20,000.00
$146,000.00
$2,522,136.00
$1,657,000.00
$3,661,180.00
$48,500.00
Water Line Extension Fund
Water Capital Surcharge
Vehicle Registration Fee
TDA Article III
TASP Impact Fees
Storm Drain General Fund
Sewer Infrastructure Fund
SB1 RMRA
Public Art Fund
Park Fund
Measure B
LLMD
Information Technology Replacement
Grants/Reimb./Developer Fee
General Government CIP Fund
Gas Tax Fund
Equipment Replacement Fund
Funding Sources
Community
: 8
Street
: 12
Park
: 5
Water
: 6
Sewer
: 6
Storm Drain
: 2
7 Proposed
New Projects FY 2027
-
31 Community Improvements
No.
Project Name
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
NEW
Real Time Monitoring
Center
325,000
0 0
0 0
325,000
Total
$325,000
$0
$0
$0
$0
$325,000
Park Improvements
No.
Project Name
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
NEW
Parks Pathway
Improvement
1,000,000
0 0
0 0
1,000,000
NEW
Delano Manongs Soccer
Field
Turf Replacement
300,000
1,550,000
0 0
0 1,850,000
Total
$1,300,000
$1,550,000
0 0
0 2,850,000
Street Improvements
No.
Project Name
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
NEW
Main Street
Signal
Improvements
500,000
0 0
0 0
500,000
NEW
Street Resurfacing
Project 2030
-
2031
0 0
0 0
4,400,000
4,400,000
NEW
Roadway
Preservation
Program
700,000
0 700,000
0 700,000
2,1
00,000
Total
1,20
0,000
0 700,00
0 0
$
5,1
00,000
$
7,000,000
Water Improvements
No.
Project Name
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
NEW
Fire Flow Pipeline
Improvement Phase 2
360,000
980,000
0 0
0 1,340,000
Total
$360,00
$980,000
$0
$0
$0
$1,340,000
Sewer
Improvements
No.
Project Name
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
NEW
Sanitary Sewer Pipeline
Improvement
Phase 2
347,000
1,070,000
0 0
0 1,417,000
Total
$347,000
$1,070,000
$0
$0
$0
$1,417,000
8 Storm Drain Improvements
No.
Project Name
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
NEW
Citywide Green
Infrastructure
Improvement
200,000
0 0
0 0
200,000
Total
$200,000
$0
$0
$0
$0
$200,000
9 Proposed
Projects with InsuƯicient or No Funding
Community Improvements
No.
Project Name
FY
2026
-
27 FY
2027
-
28 FY
2028
-
29 FY
2029
-
30 FY
2030
-
31 Total
3403
Fire Station Improvements
0 150,000
150,000
150,000
150,000
600,000
3406
City Buildings Improvements
0 500,000
500,000
500,000
500,000
2,000,000
3414
City Buildings Exterior
Improvements
0 150,000
150,000
150,000
150,000
600,000
3422
City Buildings Roof
Improvements
0 1,200,000
150,000
150,000
150,000
1,650,000
3462
On
-
Call Facilities Maintenance
& Repair
Services
0 400,000
400,000
400,000
400,000
1,600,000
3474
City Facilities AV Replacement
0 300,000
300,000
0 0
600,000
3484
Electronic Records
Management System
0 200,000
0 0
0 200,000
3485
Community Center Roof
Renovation
0 4,000,000
0 0
0 4,000,000
3490
Capital Improvement Program
Administration
0 252,000
252,000
252,000
252,000
1,008,000
3496
GIS Application Development
& Data Collection
0 225,000
225,000
225,000
225,000
900,000
3499
City Building's HVAC
System
Improvements
0 450,000
150,000
0 0
600,000
3716
City Parking Lot Rehabilitation
Program
0 200,000
200,000
200,000
200,000
800,000
Total Community Improvement Needs
$0
$8,027,000
$2,477,000
$2,027,000
$2,027,000
$14,558,000
Park
Improvements
No.
Project Name
FY
202
6 -
27 FY
2027
-
28 FY
2028
-
29 FY
2029
-
30 FY
2030
-
31 Total
3424
Citywide Park Rehabilitation
0 600,000
600,000
600,000
600,000
2,400,000
3463
On
-
Call Parks and Landscaping
Services
0 100,000
100,000
100,000
100,000
400,000
5110
Sandalwood Park Renovation
0 2,200,000
0 0
0 2,
200,000
5113
Minor Sports Courts
Rehabilitation Program
0 150,000
150,000
150,000
150,000
600,000
Total Park Improvement Needs
$0
$3,050,000
$850,000
$850,000
$850,000
$5,600,000
10 Street Improvements
No.
Project Name
FY
2026
-
27 FY
2027
-
28 FY
2028
-
29 FY
2029
-
30 FY
2030
-
31 Total
3425
Main St. Utility Undergrounding
0 1,500,000
0 0
0 1,500,000
3438
Annual Tree Replacement
Program
0 100,000
100,000
100,000
100,000
400,000
3449
Park & Street Landscape
Irrigation Improvements
0 50,000
50,000
50,000
50,000
200,00
4267
Soundwall and Barrier
Improvements
0 100,000
100,000
100,000
100,000
400,000
Total Street Improvement Needs
$0
$1,750,000
$
250
,000
$
250
,000
$
250
,000
$2,500,000
11 Project
s
Proposed To Be
Closed as of June 30, 202
6 Community Improvement Projects
Reason to Close
3423
Police Records Management System
Completed
3436
ADA Compliance Review
Completed
3437
Milpitas Gateway
-
Main Street Specific Plan Update
Completed
3445
Public Safety/DPW Disaster Plan Update
Completed
3459
ALPRs and Security Cameras Programs
To be included as part of Operating Budget
3460
Comprehensive Zoning
Ordinance Update
Completed
3465
Fire Station No.1 Modular Building
Completed
3469
Metro Impact Fee Study
Completed
3493
Milpitas SMART
To be included as part of Operating Budget
Park Improvement Projects
Reason to Close
2024
Innovation
District Parks and Trails Master Plan
Completed
3501
ARPA Park Rehabilitation
-
Engineering
Completed
Street Projects
Reason to Close
2008
Montague Pedestrian Overcrossing at Pipe Dr.
Completed
4294
SR237 HOV Land Improvements
Completed
4299
Bicycle Improvement Project
Completed
4301
Hammond Way Street Light
Completed
4303
Street Resurfacing Project 2021
-
22 Completed
4304
Street Resurfacing Project 2022
-
23 Completed
Water Projects
Reason to Close
7 100
Aging Water
System/Seismic Improvements
Completed
12 Projects
Proposed To Be
Funded as of July 1, 2026
Community Improvement Project
s
No.
Project Name
Proposed FY 2026
-
27 Amount
2010
Land/Right
-
of
-
Way Value Determination
9,
9 00
3414
City
Buildings Exterior Improvements
150,000
3462
On
-
Call Facilities Maintenance & Repair Services
400,000
3473
End
-
User Computer
Replacement
215,000
3489
Public Art Program
55,000
3490
Capital Improvement Program Administration
720,000
3499
City
Building’s HVAC System Improvements
530,000
NEW
Real
-
Time Monitoring Center
325,000
Total
$2,
404
,900
Funding Source
Amount
Equipment Replacement Fund
48 ,500
General Government CIP Fund
1,657,000
Information Technology Replacement Fund
1 46
,
0 00
Public Art Fund
55,000
Sewer Infrastructure
172,000
TASP Impact Fees
153,900
Water Capital Surcharge
172,500
Total
$2,
404
,900
13 Park Improvement
Projects
No.
Project Name
Proposed FY 2026
-
27 Amount
2023
Metro Tango
Subdistrict Park
10,600,000
3463
On
-
Call Parks and Landscaping Services
100,000
5102
Delano Manongs Park
301,516
NEW
Parks Pathway
Improvement
1,000,000
NEW
Delano Manongs Soccer Field
Turf Replacement
300,000
Total
$12,301,516
Funding
Source
Amount
Grant
301,516
Park Fund
1,100,000
TASP Impact Fees
10,900,000
Total
$
12,301,516
14 Street Improvemen
t Projects
No.
Project Name
Proposed FY 2026
-
27 Amount
3411
Sinclair LLMD 98
-
1 Improvements
20,000
3426
Annual
Sidewalk Repair Program
600
,000
3440
Streetlight, Signage, TraƯic Signal Improvements
1,0
00 ,000
4283
ADA Curb Ramp Transition Program
4 00,000
4288
TraƯic Studies & Safety Improvements
150,000
4295
Street Pavement Restriping Program
2 00,000
4306
Bike and Pedestrian Outreach
69,000
4308
Street Resurfacing Project 2026
-
27 4,8
16 ,109
4309
Street Resurfacing Project 2027
-
28 25
0,000
4311
HISP TraƯic Safety Improvement
1,911,800
NEW
Main Street
Signal Improvements
500,000
NEW
Roadway
Preservation
Program
700,000
Total
$
10,6
16,909
Funding Source
Amount
Gas Tax Fund
3,661,180
Grant
2,220,620
LLMD
20,000
Measure B
2,135,109
SB1 RMRA
2,000,000
TDA Article III
80,000
Vehicle Registration Fee
500,000
Total
$
1 0,6
16,909
15 Water Improvement
Projects
No.
Project Name
Proposed FY 2026
-
27 Amount
7110
Hydrant Replacement Program
200,000
7137
On
-
Call Water Maintenance & Repair Services
350,000
7144
Pipeline and Facility Condition Assessment
250
,000
7146
Fire Flow Interconnection Improvements
260,000
7150
Fire Flow Pipeline Improvement Phase 1
2,005,000
NEW
Fire Flow Pipeline Improvement Phase 2
360,000
Total
$
3,425,000
Funding Source
Amount
Water Capital Surcharge
3,225,000
Water Line
Extension Fund
200,000
Total
$
3,425
,000
16 Sewer Improvement
Projects
No.
Project Name
Proposed FY 2026
-
27 Amount
6118
SJ/SC Regional Waste Water Facility
4,509,000
6124
Sewer Pump Station Rehabilitation Program
300,000
6134
On
-
Call Sewer Maintenance & Repair Service
100,000
6135
Sanitary S
e
wer CCT
V
Inspection & Improvements
666,000
6138
Sanitary Sewer Pipeline Improvement Phase 1
730,000
NEW
Sanitary Sewer Pipeline Improvement Phase 2
347,000
Total
$6,652,000
Storm Drain Improvement
Projects
No.
Project Name
Proposed FY 2026
-
27 Amount
3719
On
-
Call Storm Maintenance & Repair Service
100,000
NEW
Citywide Green
Infrastructure Improvement
200,000
Total
$300,000
Funding Source
Amount
Sewer
Infrastructure Fund
6,652,000
Total
$6,652,000
Funding Source
Amount
Storm Drain General Fund
300,000
Total
$300,000
17
18 2027
-
31 Summary of Estimate Costs
No.
Project Name
Prior Year
FY
2026
-
27 FY
2027
-
28 FY
2028
-
29 FY
2029
-
30 FY
2030
-
31 Total
2010
Land/Right
-
of
-
Way Value
Determination
51,000
9,900
9,900
9,900
9,900
9,900
1 00,500
2011
Metro Police Area Police
Substation
310,000
0 690,000
0 0
0 1,000,000
3403
Fire
Station Improvements
1,950,000
0 150,000
150,000
150,000
150,000
2,550,000
3406
City Buildings
Improvements
8,026,061
0 500,000
500,000
500,000
500,000
10,026,061
3414
City Buildings Exterior
Improvements
600,000
150,000
150,000
150,000
150,000
150,000
1,350,000
3418
City Std. Details,
Guidelines, &
Specifications
400,000
0 0
0 0
0 400,000
3422
City Buildings Roof
Improvements
1,450,000
0 1,200,000
150,000
150,000
150,000
3,100,000
3423
Police Records
Management System
988,777
0 0
0 0
0 988,777
3427
Technology Projects
2,015,000
0 0
0 0
0 2,015,000
3435
Finance System Upgrade
1,250,000
0 0
0 0
0 1,250,000
3436
ADA Compliance Review
278,158
0 0
0 0
0 278,158
3437
Milpitas Gateway
-
Main
Street Specific Plan
Update
1,174,073
0 0
0 0
0 1,174,073
3445
Public Safety/DPW
Disaster Plan Update
58,000
0 0
0 0
0 58
,000
3453
Climate Action Plan
Implementation
445,000
0 0
0 0
0 445,000
3459
ALPRs and Security
Cameras Programs
515.000
0 0
0 0
0 515,000
3460
Comprehensive Zoning
Ordinance Update
1,000,000
0 0
0 0
0 1,000,000
3462
On
-
Call Facilities
Maintenance & Repair
Services
2,295,000
400,000
400,000
400,000
400,000
400,000
4,295,000
3465
Fire Station No. 1 Modular
Building Replacement
1,120,000
0 0
0 0
0 1,120,000
3466
Financial System
Enterprise Resource
Planning
3,500,000
0 0
0 0
0 3,500,000
3467
Human Resources
Information System
1,860,500
0 0
0 0
0 1,860,500
3469
Metro Impact Fee Study
330,000
0 0
0 0
0 330,000
3470
City Hall Fountain &
Landscape Renovation
250,000
0 0
0 0
0 250,000
3473
End
-
User Computer
Replacement
290,000
215,000
215,000
215,000
215,000
215,000
1,365,000
3474
City Facilities AV
Replacement
400,000
0 300,000
300,000
0 0
1,000,000
19 3475
Urban Search and Rescue
Vehicle Acquisition
1,850,000
0 0
0 0
0 1,850,000
3484
Electronic Records
Management System
150,000
0 200,000
0 0
0 350,000
3485
Community Center Roof
Renovation
500,000
0 4,000,000
0 0
0 4,500,000
3488
Community Center and
Senior Center Energy
Resilience Project
5,107,597
0 0
0 0
0 5,107,597
3489
Public Art Program
841,000
55,000
55,000
55,000
55,000
55,000
1,116,000
3490
Capital Improvement
Program
Administration
2,785,000
720,000
720,000
720,000
720,000
720,000
6,385,000
3494
City Hall Air Handlers
Replacement
2,500,000
0 0
0 0
0 2,500,000
3496
GIS Application
Development & Data
Collection
987,000
0 225,000
225,000
225,000
225,000
1,887,000
3499
City Building's HVAC
System Improvements
975,000
530,000
450,000
150,000
0 0
2,105,000
3502
Land Management System
Replacement
1,500,000
0 0
0 0
0 1,500,000
3503
Historic Resource Master
Plan Update
200,000
0 0
0 0
0 200,000
3504
Milpitas Gateway
-
Main St.
Impact Fee Study and
Sense of Place Plan
600,000
0 0
0 0
0 600,000
3508
Gateway Signage
250,000
0 0
0 0
0 250,000
3716
City Parking Lot
Rehabilitation Program
840,000
0 200,000
200,000
200,000
200,000
1,640,000
New
Real Time Monitoring
Center
-
325,000
0 0
0 0
325,000
Total Cost
$49,642,166
$2,404,900
$9,464,900
$3,224,900
$2,441,900
$2,441,900
$70,286,666
20 Land/Right
-
of
-
Way Value Determination
Project No.
2010
Project Description
This project provides for the annual evaluation and determination of land and right -
of
-
way fair market values
within the City for the purpose of updating development fee calculations such as the park -
in
-
lieu fee.
Notes
Fair market land values are evaluated annually as recommended in Section 1 of the 2014 Transit Area Development Impact Fee Update. Evaluation is typically completed annually by June. (TASP ID #45)
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
46,000
9,000
9,000
9,000
9,000
9,000
91,000
Administration
5,000
900
900
900
900
900
9,500
TOTAL
$51,000
$9,
9 00
$9,
9 00
$9,
9 00
$9,
9 00
$9,
9 00
$100,500
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
TASP Impact
Fees
51,000
9,
9 00
9,
9 00
9,
9 00
9,
9 00
9,
9 00
100,500
TOTAL
$51,000
$9,
9 00
$9,
9 00
$9,
9 00
$9,
9 00
$9,
9 00
$100,500
21 City Buildings Exterior Improvements
Project No.
3414
Project Description
This project provides for the exterior painting and repairs of City buildings including Public Works/Police, Senior Center, Community Center, City Hall, Library and its parking garage, and Sports Center. Buildings should be painted or sealed approximately
every 10 to 15 years to maintain the appearance and prevent damage caused by moisture infiltration.
Notes
Workplan in FY202
5 -
26 is
to modernize
the
exterior
façade of the
Sports Center
Building
and
p
aint the
Ayer Pump
Station reservoir.
F
unding request in FY2026
-
27 is for the exterior painting of Sal Cracolice Building. Planned funding request in
FY2027
-
28 is
for the exterior painting of the Public Works Corporation Yard/Fleet buildings
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
50,000
0 0
0 0
0 50,000
Administration
50,000
0 0
0 0
0 50,000
Improvements
500,000
150,000
150,000
150,000
150,000
150,000
1,250,000
TOTAL
$600,000
$150,000
$150,000
$150,000
$150,000
$150,000
$1,350,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
General
Government
CIP Fund
600,000
150,000
0 0
0 0
750,000
No Funding
Source
0 0
150,000
150,000
150,000
150,000
600,000
TOTAL
$600,000
$150,000
$150,000
$150,000
$150,000
$150,000
$1,350,000
22 On
-
Call Facilities Maintenance & Repair
Services
Project No.
3462
Project Description
This project provides for on
-
call repair and maintenance services at all
City facilities. Work may include, but is not
limited to, repair and replacement of electrical and mechanical systems, plumbing, parking lots, UPS battery backup system replacement, pool equipment, motors/pumps, fountain repairs, leak repairs, emergency po wer,
HVAC systems, painting, carpeting, code upgrades, replacement of floor coverings, restroom and shower facilities, kitchen improvements, locksmith services, windows, doors and gates, replacement of furniture and fixtures, removal and disposal of hazard
ous materials such as ballasts, lamps/bulbs, batteries, paint, aerosol, cleaning products, pesticides, appliances etc., and other related improvements. All work will be performed on a priority and funding availability basis.
Notes
Funding request in FY202
6 -
27 is for on
-
call repair & maintenance service contracts related to City facilities.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Improvements
2,295,000
400,000
400,000
400,000
400,000
400,000
3,895,000
TOTAL
$2,295,000
$400,000
$400,000
$400,000
$400,000
$400,000
$3,895,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
General
Government
CIP Fund
1,895,000
400,000
0 0
0 0
2,295,000
No
Funding
Source
0 0
400,00
0 400,00
0 400,00
0 400,00
0 1,600,00
0 TOTAL
$1,895,000
$400,000
$400,000
$400,000
$400,000
$400,000
$
3,895,000
23 End
-
User Computer Replacement
Project No.
3473
Project Description
The project provides for the
replacement of approximately 755 desktop and laptop computers by establishing a proactive replacement cycle of 6 years for desktops and 5 years for laptops. This initiative ensures system reliability, performance, and security of computers, and reduces cra shes, workflow disruptions, and
vulnerabilities. This approach aligns with industry best practices, enhances staff productivity, and strengthens the City’s technology infrastructure.
Notes
Workplan in
FY2025
-
26 is
to replace
1 70
computers/laptops.
On 12/16/2025, the City Council approved the
purchase order for Phase 1 of the computer replacement.
Funding request in FY 2026
-
27 is for the replacement of
141 computers/laptops. Planned funding request
s
from FY2027
-
28 to FY20
30 -
31 are
for the replacement of
approximately 141 units per fiscal year.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Equipment
290,000
215,000
215,00
0 215,000
215,00
0 215,00
0 1,365,
000
TOTAL
$290,000
$215,000
$215,000
$215,000
$215,000
$215,000
$1,365,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Equipment
Replacement
Fund
0 48,500
0 0
0 0
48,500
Information
Technology
Replacement
290,000
146,000
215,000
215,000
215,000
215,000
1,296,000
Sewer
Infrastructure
Fund
0 10,000
0 0
0 0
0 Water Capital
Surcharge
0 10,500
0 0
0 0
0 TOTAL
$290,000
$215,000
$215,000
$215,000
$215,000
$215,000
$1,365,000
24 Public Art Program
Project No.
3489
Project Description
This project
provides for the design and installation of new art and murals; creation of a Public Art Master Plan to establish goals, roles, and procedures; implementation of the Mural Program policy to promote mural activity reflective of the heritage, diversity and a
spirations of the community through engagement with muralists, property owners, community stakeholders and residents; and assessment and maintenance of City’s public art collection.
Notes
On 10/5/2021, City Council adopted a Mural Program policy. City Council approved the historical marker concept on 9/19/2023 and design services agreement on 3/18/2025 for Bob McGuire, Delano Manongs, Frederick Creighton, Peter B. Gill, Jose Higuera Adobe,
Leo Murphy, and Sunnyhills Albert Augustine Jr. Memorial Park. On 12/12/2023, City Council approved a mural to be painted on 3 traffic signal cabinets located at Jacklin/Escuela, Yosemite/Sinclair Frontage, and Calaveras/Gadsden. On 5/7/2024, City Council approved a design service
agreement for Dixon Landing Park public art mural. On 5/6/2025, City Council adopted
the Public Art Master Plan.
In FY202
4 -
202
5 , Recreation completed
an
installation of the
Womanhood Project Marker at Delano Manongs Park.
Workplan in FY202
5 -
26 is to
perform maintenance work on existing art pieces per recommendation provided in the Master Plan,
design the mural on VTA's light rail pillars, paint a mural on 3 traffic signal cabinets, and install historical markers at various parks.
Funding request in FY202
6 -
2 7
is for the annual contribution from the Public Art
Fund
to support the ongoing
implementation of the Mural Program
.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Administration
338,500
5,000
5,000
5,000
5,000
5,000
363
,
5 00
Improvements
502,500
50,000
50,000
50,000
50,000
50,000
752
,
5 00
TOTAL
$841,000
$
55 ,000
$5
5 ,000
$5
5 ,000
$5
5 ,000
$5
5 ,000
$1,
116,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Public Art Fund
841,000
55,000
55,000
55,000
55,000
55,000
1,116
,000
TOTAL
$841,000
$55,000
$55,000
$55,000
$55,000
$55,000
$1,116,000
25 Capital Improvement Program
Administration
Project No.
3490
Project Description
This project provides for the annual preparation of the Capital Improvement Program.
Work includes program
administration, printing, and software programming assistance.
Notes
Funding request in FY202
6 -
2 7
is for the annual administration and preparation of the Capital Improvement Program.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Administration
2,785,000
720,000
720,000
720,000
720,000
720,000
6,385,000
TOTAL
$2,785,000
$720,000
$720,000
$720,000
$720,000
$720,000
$6,385,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
General
Government
CIP Fund
975,000
252,000
0 0
0 0
1,227,000
Sewer
Infrastructure
Fund
626,000
162,000
162,000
162,000
162,000
162,000
1,436
,000
TASP Impact
Fees
558,000
144,000
144,000
144,000
144,000
144,000
1,278
,000
Water Capital
Surcharge
626,000
162,000
162,000
162,000
162,000
162,000
1,436
,000
No Funding
Source
0 0
252,000
252,000
252,000
252,000
1,008,000
TOTAL
$2,785,000
$720,000
$720,000
$720,000
$720,000
$720,000
$6,385,000
26 City B
uilding’s HVAC System
Improvements
Project No.
3499
Project Description
The project provides for the
repair, replacement, and/or upgrades to the HVAC systems
including, but not limited
to, chillers, boilers, exhaust fans,
furnaces, filters and variable air volume (VAV) boxes, at all City facilities. Many
of the existing systems are nearing the end of their useful life, requiring extensive repairs or replacement.
Notes
In FY2024
-
25, Public Works completed
the
replacement of an AC unit at Sports Center.
Workplan in FY202
5 -
2 6
is
for the replacement of VAV boxes at Public Works/Information Technology/Police Department building.
Funding
request in FY2026
-
27 is for H
VAC
replacement at the Sports Center, Fire Station 3,
and
Senior Center
. Planned
funding request
in FY2027
-
28 is for
the replacement of chillers and HVAC system at the Public Works/Information Technology/Police Department building
as well as
HVAC system at the
Community Center
pending the conditional
building assessment that is currently underway.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Improvements
975,000
530,000
450,000
150,000
0 0
2,105,000
TOTAL
$975,000
$530,000
$450,000
$150,000
$0
$0
$2,105,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
General
Government
CIP Fund
975,000
530,000
0 0
0 0
1 ,
5 05
,000
No Funding
Source
0 0
450,00
0 150,00
0 0
0 600,000
TOTAL
$975,000
$
53 0,000
$450,000
$150,000
$0
$0
$2,
10 5,000
27 Real
-
Time Monitoring Center
Project No.
New
Project Description
This project provides for the planning, design, and construction of Real Time Monitoring Center
(RTMC)
at the
Police
Department Building
, which will
integrate with the
existing Automated License Plate Reader (ALPR) and
Drone as a First Responder (DFR) programs
to enhance emergency response, improve situational awareness and strengthen operational efficiency and deployment strategies.
Notes
Funding request in FY2026
-
27 is for the
implementation of the system.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Improvement
s
0 325,000
0 0
0 0
325,000
TOTAL
$
0 $325,000
$0
$0
$0
$0
$325,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
General
Government
CIP
Fund
0 325,000
0 0
0 0
325,000
TOTAL
$0
$325,000
$0
$0
$0
$0
$325,000
28
29 2027
-
31 Summary of Estimate Costs
No.
Project Name
Prior Year
FY
2026
-
27 FY
2027
-
28 FY
2028
-
29 FY
2029
-
30 FY
2030
-
31 Total
2005
Delano Manongs
Pedestrian Bridge
2,425,000
0 0
0 0
0 2,425,000
2012
(Rmb) Metro Linear Trails
3,270,000
0 0
0 0
0 3,270,000
2023
Metro Tango Subdistrict
Park
1,100,000
10,600,000
0 0
0 0
11,700,000
2024
Innovation District Parks
and Trails
Master Plan
200,000
0 0
0 0
0 200,000
3424
Citywide Park
Rehabilitation
2,703,497
0 600,000
600,000
600,000
600,000
5,103,497
3463
On
-
Call Parks and
Landscaping Services
720,000
100,000
100,000
100,000
100,000
100,000
1,220,000
3471
Sinnott Park Playground
Renovation
1,800,000
0 0
0 0
0 1,800,000
3491
Cardoza Park/Dixon
Landing
Softball Fields
Improvement
800,000
0 0
0 0
0 800,000
3501
ARPA Park Rehabilitation
–
Engineering
3,270,815
0 0
0 0
0 3,270,815
3505
Sports
Center Football
Bleacher Replacement
1,700,000
0 0
0 0
0 1,700,000
5102
Delano Manongs Park
12,154,820
301,516
0 0
0 0
12,456,336
5108
Sports Fields Turf
Rehabilitation Program
776,000
0 0
0 0
0 776,000
5110
Sandalwood Park
Renovation
475,000
0 2,200,000
0 0
0 2,675,000
5113
Minor Sports Courts
Rehabilitation Program
1,200,000
0 150,000
150,000
150,000
150,000
1,800,000
5116
Pickleball Improvements
200,000
0 0
0 0
0 200,000
New
Delano Manongs Soccer
Field Turf
Replacement
0 300,000
1,550,000
0 0
0 1,850,000
New
Parks Pathway
Improvement
0 1,000,000
0 0
0 0
1,000,000
Total Cost
$32,795,132
$12,301,516
$4,600,000
$850,000
$850,000
$850,000
$52,246,648
30 Metro
Tango Subdistrict Park
Project No.
20 23
Project Description
This project provides for the design and construction of a new 5 -
acre City park within the Tango Subdistrict of the
Milpitas Metro Specific Plan area.
The park will expand Rapbone Park and be adjacent to Expedition Lane, Jubliee Lane, Sango Court, and Taro
b Court. The park may include benches, landscaping and irrigation system, pedestrian pathways, picnic areas, restroom, sports fields or courts, and other passive recreation facilities.
Notes
Augustus Rathbone Park (0.75 acres) was completed by K. Hovnanian Homes in 2017. The City purchased 1700 Sango Court (1.3
-
acres) and 1831 Tarob Court (2.5
-
acres) and needs to acquire 0.45 acres property on Sango Ct. (APN 86
-
036
-
011) to complete the land re
quirement for the park. The project will be coordinated with the S.
Milpitas Blvd. Road Extension
Project (
#
2016) and
Parkside West 2
Development (Toll Brothers) at 1901 Tarob Ct.
to construct the park and road network. On 3/19/2024, City Council approved a consultant agreement for master
planning of the park. On 6/17/2025, City Council approved the conceptual design of the park.
Workplan in
FY2025
-
26 and FY2026
-
27 is to complete CEQA
clearance
and the design of the
park
.
Funding request in FY2026
-
27 is for
the
project administration and
construction of the Project
, which is anticipated to start
in 202
8 after the
completion of Sango
Ct.
and S. Milpitas Blvd road extension. (TASP ID: DB#28).
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
900,000
40 0,000
0 0
0 0
1,
30 0,000
Administration
200,000
350
,000
0 0
0 0
55 0,000
Inspection
0 35
0,000
0 0
0 0
3 5
0,000
Improvements
0 9
,
5 00,000
0 0
0 0
9,500,000
TOTAL
$1,100,000
$10,600,000
$0
$0
$0
$0
$11,700,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
TASP Impact
Fees
1,100,000
10,600,000
0 0
0 0
1 1
,
7 00,000
TOTAL
$1,100,000
$10,600,000
$0
$0
$0
$0
$11,700,000
31 On
-
Call Parks and
Landscaping Services
Project No.
3463
Project Description
This project provides for
on
-
call maintenance and repair services at all City parks and street landscape areas.
Work may include, but is not limited to, repair and replacement of irrigation valves and main lines, irrigation controllers, landscaping, drainage, pathways, playground equipment and surfacing, sport courts and fields, picnic areas, lighting, parks buildings and restrooms, and other amenities as needed.
Notes
Funding request in FY
202
6 -
2 7
is for the various maintenance and repairs on
-
call service contracts related to the
City's park infrastructure.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Improvements
720,000
100,000
100,000
100,000
100,000
100,000
1,220,000
TOTAL
$720,000
$100,000
$100,000
$100,000
$100,000
$100,000
$1,220,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Community
Facilities
D
istrict
150,000
0 0
0 0
0 150,000
General
Government
CIP Fund
470,000
0 0
0 0
0 470,000
Park Fund
100,000
100,000
0 0
0 0
2 00,000
No Funding
Source
0 0
100,00
0 100,00
0 100,00
0 100,00
0 400,00
0 TOTAL
$720,000
$100,000
$100,000
$100,000
$100,000
$100,000
$1,220,000
32 Delano
Manongs Park
Project No.
5102
Project Description
This project provides for the design and construction of a new 4 -
acre public park on McCandless Drive, adjacent to
the new Mabel Mattos elementary school, as specified in the Milpitas Metro Specific Plan.
The park includes joint
-
use area for the City and t
he elementary school, sport field, picnic areas, all
-
inclusive play areas, dog play area,
fitness stations, community and butterfly gardens, walking trails, and restroom.
Notes
City Council granted acceptance of Phase 1 improvements including picnic areas, play areas, small dog play area, fitness stations, community and butterfly gardens, pathways, restroom, utilities, landscaping, and irrigation system on 5/16/2023, and Phase 2
improvements of the sports field on 6/6/2023. Construction schedule for Phase 3 (large dog play area) will be coordinated with Lower Penitencia Creek Pedestrian Bridge (#2005) and McCandless Well (#7076) projects which is anticipated for 2027.
On 10/24/20
25, the City
entered
into a funding agreement
with D
epartment of Parks and Recreation’s Office of
Grants and Local Services
accepting the grant
funding through the Land and Water Conservation Fund Program for portion of the
construction
cost
of Phase 3
.
(TASP ID: DB#22)
.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
1,275,000
0 0
0 0
0 1,275,000
Administration
200,000
0 0
0 0
0 200,000
Inspection
200,000
0 0
0 0
0 200,000
Improvements
10,479,820
301,516
0 0
0 0
10,781,336
TOTAL
$12,154,820
$301,516
$0
$0
$0
$0
$12,456,336
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
General
Government CIP
Fund
597,335
0 0
0 0
0 597,335
Grants/Reimb./
Developer Fees
1,182,485
301,516
0 0
0 0
1,484,001
TASP Impact Fees
10,375,000
0 0
0 0
0 10,375,000
TOTAL
$12,154,820
$301,516
$0
$0
$0
$0
$12,456,336
33 Delano Manongs Soccer Field Turf
Replacement
Project No.
New
Project Description
This project
provide
s
for the design and replacement of
the existing natural grass with artificial
turf at the
Delano Manongs s
port
field. The natural grass field has experienced heavy use and requires ongoing maintenance to maintain playable conditions. Converting to artificial turf is being considered
a more
eƯective solution
to better support
the
demand, provide a more durable surface, and reduce long term maintenance needs.
Notes
Funding request in FY2026
-
27 is for the design.
Planned
funding in FY2027
-
28 is for the construction.
Estimated
Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
0 200,000
0 0
0 0
200,000
Administration
0 100,000
0 0
0 0
100,000
Inspection
0 0
50,000
0 0
0 50,000
Improvements
0 0
1,500,000
0 0
0 1,500,000
TOTAL
$0
$300,000
$1,550,000
$0
$0
$0
$1,850,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
TASP Impact
Fee
0 300,000
1,550,000
0 0
0 1,850,000
TOTAL
$0
$300,000
$1,550,000
$0
$0
$0
$1,850,000
34 Parks Pathway Improvement
Project No.
New
Project Description
This project provides for the replacement of existing
deteriorating
pathways at various parks as identified in the
adopted Master Plan Update dated December 14
, 2021.
W
ork includes replacement of the existing decomposed
granite or asphalt paving and header boards, regrading and replacement of aggregate base as needed, minor irrigation improvements, installation of root barriers, and maintenance of existing trees.
Notes
Funding Request in FY2026
-
27 is for the design and construction of the project.
Parks
pathway
s
currently
under
consideration for replacement include, subject to
available
funding, Ben Rodger
s
, Foothill Park
, Starlite, and
Sunnyhills Albert Augustine Jr. Memorial.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Administration
0 100,000
0 0
0 0
100,000
Inspection
0 50,000
0 0
0 0
50 ,000
Improvements
0 850,00
0 0
0 0
0 850
,000
TOTAL
$0
$
1,0
00,000
$
0 $0
$0
$0
$1,
00 0,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Park Fund
0 1,0
00,000
0 0
0 0
1,
00 0,000
TOTAL
$0
$
1,0
00,000
$0
$0
$0
$0
$1,
00 0,000
35
36 2027
-
31 Summary of Estimate Costs
No.
Project Name
Prior Year
FY
2026
-
27 FY
2027
-
28 FY
2028
-
29 FY
2029
-
30 FY
2030
-
31 Total
2001
Light Rail Median
Landscaping
5,996,000
0 0
0 0
0 5,996,000
2008
Montague Pedestrian
Overcrossing at Piper
Dr.
875,000
0 0
0 0
0 875,000
2016
S Milpitas Blvd. Road
Extension
1 5
,700,000
0 0
0 0
0 1
5 ,700,000
2018
Montague Ped.
Overcrossing at
Penitencia
3,500,000
0 0
0 0
0 3
,
5 00,000
3402
McCarthy
Blvd.
LLMD
95 -
1 Improvements
1,260,256
0 75,000
75,00
0 75,000
75,00
0 1,
560,256
3411
Sinclair LLMD 98
-
1 Improvements
296,625
20,000
20,000
20,000
20,000
20,000
396,625
3425
Main St. Utility
Undergrounding
280,613
0 1
,500,000
0 0
0 1,780,613
3426
Annual Sidewalk Repair
Program
5,066,840
6 00,000
600,000
600,000
600,000
600,000
8,066,840
3430
Main St. Light Project
300,000
0 0
0 0
0 300
,000
3438
Annual Tree
Replacement Program
544,000
0 100,000
100,000
100,000
100,000
944,000
3440
Streetlight, Signage,
TraƯic Signal
Improvements
4,314,432
1,0
00,000
1,000,000
1,000
,000
1,0
00,000
1,0
00,000
9,314,432
3449
Park & Street Landscape
Irrigation Improvements
806,000
0 50,000
50,000
50,000
50,000
1,006,000
3455
Parking
Prohibited
Street Sweeping
Program
400,000
0 0
0 0
0 400,000
3468
Median Conversion
Project
600,000
0 0
0 0
0 600,000
3493
Milpitas SMART
2,955,916
0 0
0 0
0 2,955,916
4258
Calaveras Blvd
Widening Project
5,106,960
0 0
0 0
0 5,106,960
4265
Bart Extension
Coordination & Planning
3,321,156
0 0
0 0
0 3,321,156
4267
Soundwall and Barrier
Improvements
1,388,466
0 100,000
100,000
100,000
100,000
1,788,466
4274
I
-
880 Interchange Right
-
of
-
Way Closeout
727,181
0 0
0 0
0 727,181
4283
ADA curb Transition
Program
3,370,801
4 00,000
400,000
400,000
400,000
400,000
5,
3 70,801
4288
TraƯic Studies & Safety
Improvements
620,000
150,000
0 150,000
0 150,000
1,
0 70,000
4290
City Bridge
Improvements
250,000
0 0
1 0
0,000
1 0
0,000
1 0
0,000
550
,000
4294
SR237 HOV Land
Improvements
550,000
0 0
0 0
0 550,000
37 4295
Street Pavement
Restriping Program
1,350,000
2 00,000
300,000
300,000
300,000
300,000
2,
7 50,000
4299
Bicycle
Improvement
Project
1,000,000
0 0
0 0
0 1,000,000
4300
Street Resurfacing
Project 2024
-
25 4,597,562
0 0
0 0
0 4,597,562
4301
Hammond Way Street
Light Project
100,000
0 0
0 0
0 100,000
4302
Calaveras Road
Landslide Repair
500,000
0 0
0 0
0 500,000
4303
Street Resurfacing
Project 2021
-
22 4,337,276
0 0
0 0
0 4,337,276
4304
Street Resurfacing
Project 2022
-
23 4,377,050
0 0
0 0
0 4,377,050
4305
Street Resurfacing
Project 2023
-
24 5,090,490
0 0
0 0
0 5,090,490
4306
Bike and
Pedestrian
Outreach
319,000
69,000
50,000
50,000
50,000
50,000
588,000
4307
Street Resurfacing
Project 2025
-
26 4,956,235
0 0
0 0
0 4,956,235
4308
Street Resurfacing
Project 2026
-
27 0
4,866,109
0 0
0 0
4,866,109
4309
Street
Resurfacing
Project 2027
-
28 0
250
,000
4,400,000
0 0
0 4,
65 0,000
4312
SS4A Safe Route to
School Program
3,625,000
0 0
0 0
0 3,625,000
4314
HSIP TraƯic Safety
Improvement
381,900
1,911,800
0 0
0 0
2,293,700
Plan
Street Resurfacing
Project
2028
-
29 0
0 0
4,400,000
0 0
4,400,000
Plan
Street Resurfacing
Project 2029
-
30 0
0 0
0 4,400,000
0 4,400,000
New
Main Street
Signal
Improvement
0 500,000
0 0
0 0
500,000
New
Roadway Preservation
Program
0 700,000
0 700,000
0 700,000
2,100,000
New
Street Resurfacing
Project 2030
-
31 0
0 0
0 0
4,400,000
4,400,000
Total Cost
$88,864,759
$10,666,909
$8,595,000
$8,045,000
$7,195,000
$8,045,000
$131,411,668
38 Sinclair LLMD 98
-
1 Improvements
Project No.
3411
Project Description
This project provides for the design and construction of landscape and irrigation renovation along portions of Los Coches Street and Sinclair Frontage Road.
Work is part of the Lighting, Landscape, Maintenance, Assessment District (LLMD) 98
-
1. Notes
Funding request in FY202
6 -
2 7
is for the annual contribution for the improvements of the LLMD. In FY2024 -
25,
Public Works completed the replacement of the irrigation controllers, improvements and upgrades of the irrigation system, and replanting of decaying vegetation.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
10,000
0 0
0 0
0 10,000
Administration
98,125
0 0
0 0
0 98,125
Inspection
6,000
0 0
0 0
0 6,000
Improvements
182,500
20,000
20,000
20,000
20,000
20,000
282,500
TOTAL
$296,625
$20,000
$20,000
$20,000
$20,000
$20,000
$396,625
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Grants/Reimb./
Developer Fees
85,750
0 0
0 0
0 85,750
LLMD
210,875
20,000
20,000
20,000
20,000
20,000
310,875
TOTAL
$296,625
$20,000
$20,000
$20,000
$20,000
$20,000
$396,625
39 Annual Sidewalk Repair Program
Project No.
3426
Project Description
This project provides for repairs and
replacement of citywide sidewalks, curb & gutter and curb ramps to address safety and trip hazards that may be caused by settlement, tree roots, and drainage issues. Prioritization of repairs and replacement are based on service requests from the public an d suggested routes to school which will
minimize the City's risk and liability.
Notes
In FY2024
-
25, Public Works completed sidewalk repair
s
at approximately
703
locations.
On 2/17/2026, City
Council awarded
a construction contract for the annual sidewalk repairs, which is anticipated to be completed by summer 2026.
Funding request in FY 202
6 -
2 7
is for the
annual
assessment
and
repair
and on
-
call service
contracts
.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Administration
115,184
0 0
0 0
0 115,184
Improvements
4,951,656
6 00,000
600,000
600,000
600,000
600,000
7,951,656
TOTAL
$5,066,840
$
600
,000
$600,000
$600,000
$600,000
$600,000
$8,
066,840
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Gas Tax Fund
3,774,605
6 00,000
600,000
600,000
600,000
600,000
6 ,
7 74
,
605
General Fund
125,000
0 0
0 0
0 125,000
General
Government CIP
Fund
603,640
0 0
0 0
0 603,640
Sewer Fund
203,200
0 0
0 0
0 203,200
Sewer
Infrastructure
Fund
260,395
0 0
0 0
0 260,395
Water Fund
100,000
0 0
0 0
0 100,000
TOTAL
$
5 ,
066
,
840
$
600
,000
$600,000
$600,000
$600,000
$600,000
$
8 ,
0 66
,
840
40 Streetlight, Signage, TraƯic Signal
Improvements
Project No.
3440
Project
Description
This project provides for repairs, replacement, and minor improvements of streetlights, street signage, and traffic signal control system.
Work includes replacement of various type of streetlights, street signage, and illuminated overhead street signs; upg
rades to traffic signal system including controllers & cabinets, detection cameras, cabinets, battery backup system and pedestrian safety devices; on -
call service repair contracts; and related
appurtenances.
Notes
Workplan in FY202
5 -
2 6
and FY2026
-
27 is
to continue the replacement of various
types
of streetlights and signage
;
upgrades to traffic signal intersections including detection cameras, and battery backup system; and conduct a traffic signal assessment. Funding request in FY202
6 -
2 7
is for the annual on
-
call traffic signal repair contracts;
ongoing replacement of street signs and streetlights; upgrades to traffic signal intersections including controllers, detection cameras, cabinets, and battery backup system; and replacement of in tersection communication
equipment at Public Works building.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Administration
60,000
0 0
0 0
0 60,000
Improvements
3,760,000
1,000,000
1,000,000
1,000,000
1,000,000
1,000,000
8,760,000
Equipment
494,432
0 0
0 0
0 494,432
TOTAL
$4,314,432
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$
9,314,432
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Gas Tax
Fund
3,694,432
1,000,000
1,000,000
1,000,000
1,000,000
1,000,000
8,694,432
General
Government CIP
Fund
500,000
0 0
0 0
0 500,000
Grants/Reimb./
Developer Fees
120,000
0 0
0 0
0 120,000
TOTAL
$4,314,432
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$9,314,432
41 ADA Curb Ramp Transition Program
Project No.
4283
Project Description
This mandatory program is for the replacement of existing curb ramps to comply with Americans with Disabilities Act (ADA) current standards. The project allows the City to be eligible for future Federal transportation aid funds such as TDA Article III. The
curb ramp improvements will be coordinated and implemented with the annual Street Resurfacing project. Work also includes push button upgrades, crosswalk striping, signage, and sidewalk improvement associate with curb ramps. The target completion date for
citywide ADA public street curb ramp
compliance is 2040.
Notes
In 2025,
15 curb ramps
were
upgraded in conjunction with Street Resurfacing Project 2023 -
24 -
Phase 2(#4305). In
2026,
approximately 40
curb ramps are planned to be upgraded in conjunction with Gr e
at Mall Parkw
a
y Phase
2 Street Resurfacing
Project
(
#
4300
)
and
Street Resurfacing
Project
20 26 (
#
4307)
.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
90,000
10,000
10,000
10,000
10,000
10,000
140,000
Administration
90,000
10,000
10,000
10,000
10,000
10,000
140,000
Inspection
150,000
0 0
0 0
0 150,000
Improvements
3,
162,152
3 80,000
380,000
380,000
380,000
380,000
5,06
2,152
TOTAL
$3,
49 2,152
$
4 00,000
$400,000
$400,000
$400,000
$400,000
$5,
49 2,152
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Gas Tax Fund
2,740,000
3 20,000
3 20,000
3 20,000
3 20,000
3 20,000
4,340,000
Grants/Reimb./
Developer Fees
282,903
0 0
0 0
0 282,903
TDA Article III
469,249
80,000
80,000
80,000
80,000
80,000
869,249
TOTAL
$
3,492,152
$
4 00,000
$
4 00,000
$
4 00,000
$
4 00,000
$
4 00,000
$
5 ,
49 2,152
42 TraƯic Studies & Safety Improvements
Project No.
4288
Project Description
This project provides for citywide
traffic studies, safety and minor traffic improvements as described in the citywide Travel Safety Plan and from community service requests.
Traffic studies may include, but are not limited
to, data collection including vehicle, bicycle, and pedestrian coun ts, level of service analysis, speed surveys,
traffic flow and safety assessment and Vehicle Miles Traveled Analysis.
Minor traffic and safety improvements may include, but are not limited to, traffic signal improvements including emergency vehicle preem
ption, pedestrian signals, signal cabinets and heads upgrades, and signal timing and phasing/turning movements; pedestrian improvements including bulb -
outs, fencing, guardrails, intersection and
crosswalk striping, and flashing beacons;
roadway improvement
s including advanced stop bars, green bike and
buffer lanes, high
-
friction pavement treatments, lighting, radar feedback signs, retroreflective signage, rumble strips, and striping and marking.
Notes
In FY2024
-
25, staff completed an assessment of signal timing at Carnegie Dr. and traffic data collection at
approximately 96 locations
to support speed limit posting
certification
.
Workplan in FY2025
-
26 is to
continue
developing traffic safety mitigation and improvement measure al ong Escuela Parkway, McCandless Drive, and
Abbott Ave. Funding request in FY2026
-
27 is for
continued planning of the traffic safety improvements as identified in the adopted Citywide Traffic Safety Plan
and
traffic
studies
conducted in response to
community service
requests.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
240,000
100
,000
0 100
,000
0 100
,000
5 40,000
Administration
20,000
0 0
0 0
0 20,000
Improvements
360,000
50 ,000
0 50
,000
0 50
,000
51 0,000
TOTAL
$620,000
$150,000
$
0 $150,000
$
0 $150,000
$1,
0 70,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Gas Tax Fund
200,000
150,000
0 150,000
0 150,000
6 50,000
Street
Improvement
Fund
420,000
0 0
0 0
0 420,000
43 TOTAL
$620,000
$150,000
$
0 $150,000
$
0 $150,000
$1,
0 70,000
Street Pavement Restriping Program
Project No.
4295
Project Description
This project provides for the
improvement, restriping, and replacement of pavement markings on City's paved roadways in accordance with California Manual on Uniform Traffic Control Devices (MUTCD). The program will provide guidance and information, and improve roadway safety for motori sts, bicyclists, and pedestrians. Work
includes minor repairs to asphalt pavement; restriping of existing pavement legends, lane lines, and crosswalks; placement of markers; and respond to public requests through MyMilpitas App.
Notes
On 6/3/2025, the City Council granted acceptance for the street restriping of North and South Milpitas Blvd., Evans/Piedmont Road, Dixon Landing/Dixon Road, and Marylinn Dr. from North Abel St. to North Main St.
Workplan is FY2025
-
26 is to restripe Yosemite Drive.
Funding request in FY202
6 -
27 is for on
-
call service repair
contracts; restriping in school zones, high traffic areas and main thorough -
fares; and responding to public
requests received through the MyMilpitas App.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Administration
40,000
0 0
0 0
0 40,000
Improvements
1,310,000
2 00,000
300,000
300,000
300,000
300,000
2,
7 10,000
TOTAL
1,350,000
$
2 00,000
$300,000
$300,000
$300,000
$300,000
$2,
7 50,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Gas Tax Fund
1,05
0,000
2 00,000
300,000
300,000
300,000
300,000
2,
4 5
0,000
General
Government CIP
Fund
300,000
0 0
0 0
0 300,000
TOTAL
$1,
35 0,000
$
2 00,000
$300,000
$300,000
$300,000
$300,000
$2,
7 50
,000
44 Bike and Pedestrian Outreach
Project No.
4306
Project Description
This project provides for the public outreach activities to promote, educate, and encourage bicycling and walking in support of the circulation policy goals of the City's 2040 General Plan and Trail, Pedestrian, and Bicycle Master Plan.
The Valley Transpor
tation Authority (VTA) adopted and established a 2016 Measure B Bike and Pedestrian Education and Encouragement Program. They distributed based funding on a population -
based formula to eligible
cities that encourages the use of bicycles and walking for tra nsportation rather than motorized vehicles.
Notes
On 6/1/202
1 , City Council approved a Master Agreement with VTA for the 2016 Measure B Bike and Pedestrian Education and
Encouragement Program
, and an
amendment extending the agreement term to March 31, 2047
on
5/6/2025.
In FY 2025
–
26, staff advanced bicycle education and outreach by presenting program goals to City commissions, producing educational videos, and hosting bicycle safety classes and workshops at major events like the Holi Festival and Earth Day to engage resi
dents and promote safe, sustainable
transportation.
Funding
request in FY 2026
–
27 is
the anticipated annual funding from Measure B
for
continuing
community outreach,
educational programming, and promotional activities
to
encourage safe bicycling, reduce emissions, and advance the City’s long
-
term mobility and sustainability goals.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Administration
319
,000
69,000
50,000
50,000
50,000
50,000
588,000
TOTAL
$
319
,000
$69,000
$50,000
$50,000
$50,000
$50,000
$588,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Measure B
319,000
69,000
50,000
50,000
50,000
50,000
588,000
TOTAL
$319,000
$69,000
$50,000
$50,000
$50,000
$50,000
$588,000
45 Street Resurfacing Project 2026
-
27 Project No.
4308
Project Description
This project provides for the repair, rehabilitation, and/or reconstruction of roadway pavement. Streets are selected for
improvement based on a Pavement Management System to optimize the pavement condition rating and use of funding. Locations and streets may vary dependent on the City’s needs and funding. There are currently 129 center lane miles of streets that are owned by
the City. The project will include replacement and upgrade of curb, gutter, driveway, sidewalk, installation of ADA ramps, and installation of Class II bike lanes and Class III bike route facilities as described in the adopted 2022 Trail, Pedestrian and B icycle Master Plan.
Notes
Planned s
treets
f
or resurfacing
includes
Santa Rita Ave. from Tramway Dr. to Paseo Refugio, Paseo Refugio from Dundee Ave. to N. Hillview Dr., Dundee Ave., Los Pinos Ave., Aberdeen Way and Ct., Glasgow Ct., Shetland Ct., Shelley Ct., Troon Ct., Angus Dr., Loch Lomond Ct., Clyde Ct., Anacapa Ct.,
Terra Bella Dr., Valencia Dr., Pacheco
Dr., Las Lomas Dr., Alcosta Dr., Los Positos Dr., Canada Dr., and Tassasara Dr.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
0 3
5 0
,000
0 0
0 0
3 5
0 ,000
Administration
0 150,000
0 0
0 0
150,000
Inspection
0 100,000
0 0
0 0
100,000
Improvements
0 4,
2 1
6,109
0 0
0 0
4,
2 1
6,109
TOTAL
$0
$4,
8 1
6,109
$0
$0
$0
$0
$4,
8 1
6,109
Funding
Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Gas Tax
0 250
,000
0 0
0 0
25 0,000
Measure B
0 2,066,109
0 0
0 0
2,066,109
SB 1 RMRA
0 2,000,000
0 0
0 0
2,000,000
Vehicle
Registration Fee
0 500,000
0 0
0 0
500,000
TOTAL
$0
$4,
816
,109
$0
$0
$0
$0
$4,
8 16
,109
46 Street Resurfacing Project 2027
-
28 Project No.
4309
Project Description
This project provides for the repair, rehabilitation, and/or reconstruction of roadway pavement. Streets are selected for improvement based on a Pavement Management System to optimize the pavement condition rating and use of funding. Locations and streets may vary dependent on the City’s needs and funding. There are currently 129 center lane miles of streets that
are owned by the City. The project will include replacement and upgrade of curb, gutter, driveway, sidewalk, installation of ADA ramps, and installation of Class II bike lanes and Class III bike route facilities as described in the adopted 2022 Trail, Ped estrian and Bicycle Master Plan.
Notes
Streets under consideration for resurfacing, but subject to change, are
on
N. Abbott Ave. from Redwood Ave. to
Heath St. and adjacent streets.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
0 250
,000
0 0
0 0
250
,000
Administration
0 0
150,000
0 0
0 150,000
Inspection
0 0
100,000
0 0
0 100,000
Improvements
0 0
4,150,000
0 0
0 4,150,000
TOTAL
$0
$
250
,000
$4,400,000
$0
$0
$0
$4,
650
,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Gas Tax
0 250
,000
0 0
0 0
25 0,000
Measure B
0 0
1,900,000
0 0
0 1,900,000
SB 1 RMRA
0 0
2,000,000
0 0
0 2,000,000
Vehicle
Registration Fee
0 0
500,000
0 0
0 500,000
TOTAL
$0
$
250
,000
$4,400,000
$0
$0
$0
$4,
650
,000
47 HSIP TraƯic Safety Improvement
Project No.
4314
Project Description
This project provides for the design and installation of retroreflective backplates and the implementation of Leading Pedestrian Intervals (LPI) at all
72 City
-
owned
traffic signal
intersections
;
enhance
the
visibility
with
signage, daylighting and beacons of
three unsignalized intersection
at
McCarthy B
oulevard
and Murphy Ranch
R
oad,
Kennedy Dr
ive
and N
.
Park Victoria
Drive and
N
.
Temple Dr
ive
and Golden Hills Dr
ive, with
signage,
daylighting and beacons
;
and imp
rove the horizontal curve along North McCart
hy Boulevard
,
south of the Milpitas
and
Fremont city boundary.
Notes
In February 2025, the City was awarded
a
grant
in the amount of $2M
from the Local Highway Safety Improvement
Program (HSIP) Cycle 12.
In November 2025, the City entered into a program supplement agreement with Caltrans
for
the P
roject design and administration. Workplan in FY2025
-
26 and FY2026
-
27 is to begin the
design, which is
anticipated to be completed by 2027
.
Funding request in FY2026
-
27 is for the
construction of the
P
roject
, which is
anticipated to
be authorized in 2027 and
begin in 2028.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
300,000
0 0
0 0
0 300,000
Administration
81,900
200,000
0 0
0 0
281,900
Improvements
0 1,711,800
0 0
0 0
1,711,800
TOTAL
$381,900
$1,911,800
$0
$0
$0
$0
$2,293,700
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Gas Tax
38,190
191,180
0 0
0 0
229,370
Grant
343,710
1,720,620
0 0
0 0
2,064,300
TOTAL
$381,900
$1,911,800
$0
$0
$0
$0
$2,293,670
48 Main Street
Signal Improvements
Project No.
New
Project Description
This project provides for the design and replacement of outdated traffic signal hardware , including
upgra
des to
non
-
ADA
-
compliant pedestrian push buttons and traffic signal hardware ,
at five (5) signalized intersections along
Main Street, from Carlo Street to Great Mall Parkway
.
Notes
This project was awarded $500k earmark from Federal Community Project Funding as part of the House Appropriations Committee fiscal year 2024 bill signed by the President on March 12,2024.
Workplan in
F
Y2025
-
26 and
FY2026
-
27 is to complete Caltrans E
-
76 and
obligate the funds by 9/30/2027. Funding request in FY2026 -
27 is
for the design and improvement of the Project
, which is anticipated to be completed in 2028.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
0 100,000
0 0
0 0
100,000
Administration
0 100,000
0 0
0 0
100,000
Inspection
0 0
0 0
0 0
0 Improvements
0 300,000
0 0
0 0
300,000
TOTAL
$0
$500,000
$0
$0
$0
$0
$500,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Grant
0 $500,000
0 0
0 0
500,000
TOTAL
$0
$500,000
$0
$0
$0
$0
$500,000
49 Roadway
Preservation
Program
Project No.
New
Project Description
The pro
gram
provides for the ongoing maintenance and preservation of the City’s roadway network to maintain pavement conditions at an acceptable Pavement Condition Index (PCI) and extend the useful life of existing streets. Work typically includes preventative mainten
ance treatments such as slurry seal, cape seal, crack
sealing, and localized pavement repairs.
The program focuses on timely, cost
-
effective preservation strategies that slow pavement deterioration, reduce the need for more costly rehabilitation or reconstruction, and support safe and reliable travel for motorists, bicyclists, and pedestrians.
Notes
Funding request in FY2026
-
27 is for the design and implementation of the project.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
0 100,000
0 100,000
0 100,000
300,000
Administration
0 50,000
0 50,000
0 50,000
150,000
Inspection
0 50,000
0 50,000
0 50,000
150,000
Improvements
0 500,000
0 500,000
0 500,000
1,500,000
TOTAL
$0
$700,000
$0
$700,000
$0
$700,000
$2,100,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Gas Tax
0 700,000
0 700,000
0 700,000
2,100,000
TOTAL
$0
$700,000
$0
$700,000
$0
$700,000
$2,100,000
50
51 2027
-
31 Summary of Estimate Costs
No.
Project Name
Prior Year
FY
2026
-
27 FY
2027
-
28 FY
2028
-
29 FY
2029
-
30 FY
2030
-
31 Total
2002
2nd SCVWD Water
Reservoir & Pump
Station
200,000
0 0
0 3,800,000
9,800,000
13,800,000
2009
SCVWD Second
Water Supply Turnout
100,000
0 0
0 0
532,000
632,000
2019
(Rmb) Metro Recycled
Water Distribution
605,000
0 0
0 0
800,000
1,405,000
2020
SCVWD Zone 1
Pressure Red. Valve
100,000
0 0
0 0
430,000
530,000
7076
Well Upgrade Program
15,990,000
0 0
0 0
0 15,990,000
7100
Aging Water
System/Seismic
Improvements
4,382,781
0 0
0 0
0 4,382,781
7110
Hydrant Replacement
Program
1,036,360
200,000
200,000
200,000
200,000
200,000
2,036,360
7112
Reservoir Cleaning
Program
840,000
0 0
100,000
0 0
940,000
7118
Dempsey Road Water
Line Replacement
7,857,772
0 0
0 0
0 7,857,772
7126
Water Conservation
Program
1,985,000
0 100,000
100,000
100,000
100,000
2,385,000
7127
Supervisory Control &
Data Acquisition
6,716,600
0 200,000
0 0
0 6,916,600
7133
Minor Water Projects
3,946,000
0 100,000
100,000
100,000
100,000
4,346,000
7135
Water Leak Detection
& Condition
Assessment Program
631,474
0 100,000
100,000
100,000
100,000
1,031,474
7137
On
-
Call Water
Maintenance & Repair
Services
1,925,000
350,000
350,000
350,000
350,000
350,000
3,675,000
7140
Cross Connection
Control Program
1,150,000
0 200,000
200,000
200,000
200,000
1,950,000
7141
Asset Renewal and
Replacement
Program
1,685,000
0 1,685,000
1,685,000
1,685,000
1,685,000
8,425,000
7144
Pipeline & Facility
Condition
Assessment
-
250,000
250,000
2,240,000
0 0
2,740,000
7146
Fire Flow
Interconnection
Improvements
-
260,000
712,000
0 0
480,000
1,452,000
7147
Pinewood Well
Facility Rehabilitation
Project
500,000
0 0
2,200,000
0 0
2,700,000
7148
Pressure Reducing
Facilities Relocation
Project
465,000
0 1,580,000
0 0
0 2,045,000
7149
Sunnyhills Turnout
Rehabilitation Project
1,165,000
0 0
0 0
0 1,165,000
52 7150
Fire Flow Pipeline
Improvement
-
Phase 1
750,000
2,005,000
0 0
0 0
2,755,000
Plan
Risk and Resiliency
Improvements
135,000
0 0
2,000,000
0 0
2,135,000
Plan
Fire Flow Pipeline
Improvements
-
0 1,470,000
0 240,000
405,000
2,115,000
New
Fire Flow Pipeline
Improvement
-
Phase
2 -
360,000
980,000
0 0
0 1,340,000
Total Cost
$52,165,987
$3,425,00
$7,927,00
$9,275,000
$6,775,000
$15,182,000
$94,749,987
53 Hydrant Replacement Program
Project No.
71 1
0 Project Description
This project provides for
replacement of citywide hydrants and related infrastructure as recommended in the 2021 Water Master
Plan. The City maintains approximately 2,900 fire hydrants which typically have a service life of 30 years.
Notes
On 3/18/2025, City Council authorized the purchase of 30 hydrants and valves,
and the issuance of additional
purchase orders as needed for a period of up to five years. Workplan in FY202 5 -
26 is for operation staff to replace
hydrants that are knocked down, aging or pose potential risks. Funding request in FY202 6 -
2 7
is for the purchase
and replacement of 30 hydrants and valves to meet the annual replacement goal.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
10,000
0 0
0 0
0 10,000
Administration
5,000
0 0
0 0
0 5,000
Inspection
10,000
0 0
0 0
0 10,000
Improvements
1,011,360
200,000
200,000
200,000
200,000
200,000
2 ,
011
,
360
TOTAL
$1,036,360
$200,000
$200,000
$200,000
$200,000
$200,000
$
2 ,
036
,
360
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Water Capital
Surcharge
344,260
0 0
0 0
0 344,260
Water Line
Extension Fund
692,100
200,000
200,000
200,000
200,000
200,000
1,692,100
TOTAL
$1,036,360
$200,000
$200,000
$200,000
$200,000
$200,000
$2,036,360
54 On
-
Call Water Maintenance & Repair
Services
Project No.
7137
Project
Description
This project provides for on
-
call maintenance and repair services of the City's water infrastructure. Work may include, but is not limited to, the repair and replacement of electrical and mechanical systems (VFD & generators), motors and pumps, pipelines,
meters, aboveground/underground storage tanks, and other related improvements.
All work will be performed on a priority and funding availability basis.
Notes
Funding request in FY202
6 -
2 7
is
for on
-
call maintenance and repair contracts related to the City's water infrastructure.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Improvements
1,925,000
350,000
350,000
350,000
350,000
350,000
3 ,
675
,000
TOTAL
$1,925,000
$350,000
$350,000
$350,000
$350,000
$350,000
$
3 ,
675
,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Water Capital
Surcharge
1,697,000
350,000
350,000
350,000
350,000
350,000
3 ,
447
,000
Water Line
Extension Fund
228,000
0 0
0 0
0 228,000
TOTAL
$1,925,000
$350,000
$350,000
$350,000
$350,000
$350,000
$3,675,000
55 Pipeline & Facility Condition Assessment
Project No.
7144
Project Description
This project
provides for a condition assessment of the City’s water facilities and pipeline distribution system to manage infrastructure risk before failure as recommended per the adopted Water Master Plan Update, dated June 2021.
The assessment for pipelines will foc
us on metallic and asbestos cement material segments
including
appurtenances such as air valves, blow off assemblies, fire hydrants, and valves to document estimate remaining useful life; and, for facilities will focus on interties, PRVs, pumping stations,
reservoirs, turnouts, and
wells that are identified as Level B and C facilities.
Notes
Funding request in FY2026
-
27 is for pipeline assessment.
Planned funding
requests
in FY2027
-
28 and FY2028
-
29 are
for
pipeline and
facilities
assessment
,
respectively.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
0 0
0 0
0 0
0 Administration
0 250,000
250,000
2,240,000
0 0
2,740,000
Inspection
0 0
0 0
0 0
0 Improvements
0 0
0 0
0 0
0 TOTAL
$0
$250,000
$250,000
$2,240,000
$0
$0
$2,740,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Water Capital
Surcharge
0 250,000
250,000
2,240,000
0 0
2,740,000
TOTAL
$0
$250,000
$250,000
$2,240,000
$0
$0
$2,740,000
56 Fire Flow Interconnection Improvements
Project No.
7146
Project Description
This project provides for the design and installation of new emergency PRVs as recommended per the adopted Water Master Plan Update, dated June 2021.
There are several locations where fire hydrants cannot deliver the recommended fire flow while maintaining
a 20 psi residual system pressure. Installation of PRVs will improve fire flows under normal operations and provide redundancy.
The project includes the replacement
and installation
of
three
PRV
s at Hammond Way
(ECIP
-
V
-
01)
,
Cedar (BCIP
-
V
-
01)
and
the end o
f Corning Ave (ECIP
-
V
-
02)
and one
isolation valves at Co
elho (ECIP
-
V
-
03)
.
Notes
F
unding request in FY2026
-
27 is for
the planning and design of the Project. Planned funding request in
FY2027
-
28 is for the construction of
ECIP
-
V
-
01, ECIP
-
V
-
02 and BCIP
-
V
-
01. Planned funding request i
n
FY2030
-
31 is for ECIP
-
V
-
03. Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
0 100,000
0 0
0 0
100,000
Administration
0 160,000
0 0
0 0
160,000
Inspection
0 0
20,000
0 0
0 20,000
Improvements
0 0
692,000
0 0
480,000
1,172,000
TOTAL
$0
$260,000
$712,000
$0
$0
$480,000
$1,452,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Water Capital
Surcharge
0 260,000
712,000
0 0
480,000
1,452,000
TOTAL
$0
$260,000
$712,000
$0
$0
$480,000
$1,452,000
57 Fire Flow Pipeline Improvement Phase 1
Project No.
7150
Project Description
This project provides for the design and construction of the
upsizing
of
water mains
, identified as
ID ECIP
-
PI
-
05,
06, 07, 08, 10, 11, 16
in the adopted Water Master Plan Update, dated June 2021,
to deliver the recommended fire
flow at surrounding fire hydrants
.
According to the City’s potable water design guidelines and the State's recommendations, the City’s water system shall provide minimum standard fire flow rate for a required duration while maintaining at least 20 pounds per square inch (psi) residua l pressure during a fire flow event.
Notes
Workplan in
FY2025
-
26 is
to
complete the
design
by
winter 2027.
F
unding request in FY2026
-
27 is for the
construction
,
which is anticipated to start in 2027
.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
600,000
0 0
0 0
0 600,000
Administration
150,000
0 0
0 0
0 150,000
Inspection
0 150,000
0 0
0 0
150,000
Improvements
0 1,855,000
0 0
0 0
1,855,000
TOTAL
$750,000
$2,005,000
$0
$0
$0
$0
$2,755,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Water Capital
Surcharge
750,000
2,005,000
0 0
0 0
2,005,000
TOTAL
$750,000
$2,005,000
$0
$0
$0
$0
$2,755,000
58 Fire Flow Pipeline
Improvement Phase 2
Project No.
New
Project Description
This project provides
for the design and construction of
the
upsizing
of
water mains
, identified as
ID ECIP
-
PI
-
21,
23, 25, 26 in the adopted Water Master Plan Update, dated June 2021, to deliver the recommended fire flow at
surrounding fire hydrants
.
According to the City’s potable water design guidelines and the State's recommendations, the City’s water system shall provide minimum standard fire flow rate for a required duration while maintaining at least 20 pounds per square inch (psi) residual press ure during a fire flow event.
Notes
Funding request in FY202
6 -
2 7
is for the
design of
p
hase 2
,
which is anticipated to be completed in 2027.
Planned
f
unding request in FY202
7 -
28 is for the construction of
the Projec
t, which is anticipated to start in 2028.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
0 140,000
0 0
0 0
140,000
Administration
0 220,000
0 0
0 0
220,000
Inspection
0 0
30,000
0 0
0 30,000
Improvements
0 0
950,000
0 0
0 950,000
TOTAL
$0
$360,000
$980,000
$0
$0
$0
$1,340,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Water Capital
Surcharge
0 360,000
980,000
0 0
0 1,340,000
TOTAL
$0
$360,000
$980,000
0 0
0 $1,340,000
59
60 2027
-
31 Summary of Estimate Costs
No.
Project
Name
Prior Year
FY
2026
-
27 FY
2027
-
28 FY
2028
-
29 FY
2029
-
30 FY
2030
-
31 Total
6118
SJ/SC regional Waste
Water Facility
99,464,245
4,509,000
9,630,000
2,458,000
14,892,000
5,718,000
136,671,245
6124
Sewer Pump Station
Rehabilitation Program
2,852,000
300,000
0 0
0 0
3,152,000
6126
Minor Sewer Projects
313,000
0 50,000
50,000
50,000
50,000
513,000
6134
On
-
Call Sewer
Maintenance & Repair
Services
465,000
100,000
100,000
100,000
100,000
100,000
965,000
6135
Sanitary Sewer
CCTV
Inspections &
Improvements
1,617,996
666,000
333,000
333,000
333,000
333,000
3,615,996
6136
Sanitary Sewer Pipeline
Improvements
-
0 2,912,000
1,365,000
1,915,000
6,681,000
12,873,000
6137
Forcemain "A" Project
2,940,000
0 23,200,000
0 0
0 26,140,000
6138
Sanitary Sewer Pipeline
Improvement
-
Phase 1
266,000
730,000
0 0
0 0
996,000
New
Sanitary Sewer
Pipeline Improvement
-
Phase 2
-
347,000
1,070,000
0 0
0 1,417,000
Total Cost
$107,918,241
$6,652,000
$37,295,000
$4,306,000
$17,290,000
$12,882,000
$186,343,241
61 SJ/SC Regional Waste Water
Facility
Project No.
6118
Project Description
The City pumps sewage to the San Jose/Santa Clara Regional Waste Water Facility for waste water treatment
before it can be discharged into the San Francisco Bay.
The facility was originally constructed in 1956 and is
reaching the end of its useful life.
The City of San Jose, who operates the facility, is undergoing an estimated $2 billion rehabilitat
ion project to completely overhaul the facility over the next 30 years.
The City of Milpitas uses
approximately 7%, which equals to approximately $140 million of the cost of improvements over the next 30 years.
This project funds Milpitas’ share of the reh
abilitation costs.
Notes
Funding request in FY202
6 -
27 and planned funding request from FY202
7 -
2 8
to FY20
30 -
31 are based on Water
Pollution Control 2026
-
2030 Draft Capital Improvement Program.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Improvements
99,464,245
4,509,000
9,630,000
2,458,000
14,892,000
5,718,000
136
,
671
,
245
TOTAL
$99,464,245
$4,509,000
$9,630,000
$2,485,000
$14,892,000
$5,718,000
$
136
,
671
,
245
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Sewer Fund
21,765,000
0 0
0 0
0 21,765,000
Sewer
Infrastructure
Fund
22,649,245
4,509,000
9,630,000
2,458,000
14,892,000
5,718,000
59 ,
856
,
245
Sewer
Treatment Fund
19,550,000
0 0
0 0
0 19,550,000
Wastewater
Revenue Bonds
35,500,000
0 0
0 0
0 35,500,000
TOTAL
$99,464,245
$4,509,000
$9,630,000
$2,485,000
$14,892,000
$5,718,000
$
136
,
671
,
245
62 Sewer Pump Station Rehabilitation
Program
Project No.
61 2
4 Project
Description
This project provides for facility improvements and upgrades at the Main and Venus Wastewater Lift Stations to improve the resiliency of the system and ensure that sewage will continue to be pumped out of the City to the San Jose Regional Treatment Plan.
Work may include, but not limited to, rotational assessment of the wastewater pumps and peripheral equipment rehabilitation; replacement of electrical control, flow meters and equipment, variable frequency drives (VFD), and grinders; upgrades and repairs t o pipelines, valves and facilities amenities,
etc.
Notes
In FY2024
-
25, Public Works completed the replacement of two grinders at Main Lift Pump Station.
On 11/19/2024,
City Council approved the replacement of grinders, which was
completed in 2025. Workplan in FY2025
-
26 and
FY2026
-
27 is to replace or repair grinder(s) and VFD(s),
prepare
the design for the installation of Vactor Truck
Disposal Facility, and the replacement of the air release valves along Forcemain "B" and magnetic flow meters at the Main Lift Station. Funding request in FY202
6 -
2 7
is for the annu
al replacement of grinders and VFDs
.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
100,000
0 0
0 0
0 100,000
Administration
175,000
0 0
0 0
0 175,000
Improvements
2,477,000
300,000
0 0
0 0
2,
7 77,000
Equipment
100,000
0 0
0 0
0 100,000
TOTAL
$2,852,000
$0
$0
$0
$0
$0
$
3,1
52,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Sewer
Infrastructure
Fund
2,852,000
300,000
0 0
0 0
3,1
52,00
TOTAL
$2,852,000
$
300,000
$0
$0
$0
$0
$
3,1
52,000
63 On
-
Call Sewer Maintenance &
Repair Services
Project No.
6134
Project Description
This project provides for
on
-
call maintenance and repair services of the City's sewer infrastructure. Work may include, but is not limited to, repair and replacement of electrical and mechanical systems (VFD & generators), motors and pumps, pipelines, and other related improvement s. All work will be performed on a priority and
funding availability basis.
Notes
Funding request
in FY2026
-
27 is for on
-
call maintenance and repair contracts related to the city's sewer infrastructure.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Improvements
465,000
100,000
100,000
100,000
100,000
100,000
965,000
TOTAL
$465,000
$100,000
$100,000
$100,000
$100,000
$100,000
$965,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Sewer Fund
74,000
0 0
0 0
0 74,000
Sewer
Infrastructure
Fund
391,000
100,000
100,000
100,000
100,000
100,000
891,000
TOTAL
$465,000
$100,000
$100,000
$100,000
$100,000
$100,000
$965,000
64 Sanitary Sewer Pipeline
Improvements
Project No.
6135
Project Description
This project provides for Closed
-
Circuit
Television (CCTV) inspection of medium to extreme risk 24 -
inch diameter
or greater sewer pipelines and to repair defects discovered during the inspection as recommended per the adopted Sewer Master Plan, dated August 2021.
The Master Plan includes an inspe
ction map (figure 9
-
3) of the
highest priority areas which totals 55,000 feet.
Notes
On 10/1/2024, City Council approved a fee reimbursement agreement with the developer of the 1355 California Circle Project for sanitary sewer sectional liner improvements , which was completed in spring 2025
. Funding
request in FY202
6 -
2 7
is for the ongoing CCTV inspection of pipelines greater than 24" and repair pipeline defects discovered during inspections.
CCTV inspections is anticipated to start
in
2026
.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Improvements
1,617,996
666,000
333,000
333,000
333,000
333,000
3 ,
615
,
996
TOTAL
$1,617,996
$666,000
$333,000
$333,000
$333,000
$333,000
$
3 ,
615
,
996
Funding
Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Sewer
Infrastructure
Fund
1,617,996
666,000
333,000
333,000
333,000
333,000
3,615,996
TOTAL
$1,617,996
$666,000
$333,000
$333,000
$333,000
$333,000
$3,615,996
65 Sanitary Sewer Pipeline
Improvement Phase 1
Project No.
613
8 Project Description
This project provides for the design and construction of sewer pipe segments with significant defects and considered extreme risk with the greatest likelihood of deterioration and the highest consequence of failure
,
identified as PI 1
-
5 in
the adopted Sewer Master Plan, dated August 2021. The sewer renewal and replacement study in the Master Plan identifies several pipelines that are considered extreme risk of failure based on CCTV inspection, structural rating, susceptibility to liquefact ion, pipe obstruction, age, and material type.
Notes
Work plan in FY2025
-
26 is to
complete
the
by
winter
2027. F
unding request in FY2026
-
27 is for construction
, which
is anticipated to start in 2027.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
166,000
0 0
0 0
0 166,000
Administration
100,000
0 0
0 0
0 100,000
Inspection
0 80,000
0 0
0 0
80,000
Improvements
0 650,000
0 0
0 0
650,000
TOTAL
$266,000
$730,000
$0
$0
$0
$0
$
996
,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Sewer
Infrastructure
Fund
266,000
730,000
0 0
0 0
996,000
TOTAL
$266,000
$730,000
$0
$0
$0
$0
$996,000
66 Sanitary Sewer Pipeline
Improvement Phase 2
Project No.
NEW
Project Description
This project provides for the design and construction of sewer pipe segments with significant defects and
considered extreme risk with the greatest likelihood of deterioration and the highest consequence of failure ,
identified as PI
6 -
10 in
the adopted Sewer Master Plan, dated August 2021. The sewer renewal and replacement study in the Master Plan identifies several pipelines that are considered extreme risk of failure based on CCTV inspection, structural rating, susceptibility to liquefact ion, pipe obstruction, age, and material type.
Notes
Funding request
in FY2026
-
27 is for the
design
, which is anticipated to be completed in 2027.
Planned funding
request in FY202
7 -
28 is for the constructio
n
, which is anticipated to start in 2028.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
0 147,000
0 0
0 0
147,000
Administration
0 200,000
0 0
0 0
200,000
Inspection
0 0
30,000
0 0
0 30,000
Improvements
0 0
1,040,000
0 0
0 1,040,000
TOTAL
$0
$347,000
$1,070,000
$0
$0
$0
$1,417,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Sewer
Infrastructure
Fund
0 347,000
1,070,000
0 0
0 1,417,000
TOTAL
$0
$347,000
$1,070,000
$0
$0
$0
$1,417,000
67
68 2027
-
31 Summary of Estimate Costs
No.
Project Name
Prior Year
FY
2026
-
27 FY
2027
-
28 FY
2028
-
29 FY
2029
-
30 FY
2030
-
31 Total
3714
Flap Gate Replacement
500,000
0 400,000
0 0
0 900,000
3715
Storm Drain System
Rehabilitation
2,616,410
0 0
0 0
0 2,616,410
3719
On
-
Call Storm Maintenance
& Repair Services
245,000
100,000
0 0
0 0
345,000
3724
Main Street Flood Study
250,000
0 1,799,843
0 0
0 2,
049,843
3725
Technology Drive Utilities
and Road
Improvement
4,600,000
0 0
0 0
0 4,600,000
New
Citywide Green
Infrastructure
Improvement
-
200,000
0 0
0 0
200,000
Total Cost
$8,211,410
$300,000
$2,199,843
$0
$0
$0
$10,711,253
69 On
-
Call Storm Maintenance &
Repair Services
Project No.
3719
Project Description
This project provides for on
-
call maintenance and repair services of all City storm infrastructure, assets, and
appurtenances. Work may include, but is not limited to, repair and replacement of electrical and mechanical
systems (VFD & generators), motors and pumps, pipelines, aboveground/underground storage tanks, and other
related improvements. All work will be performed on a priority and funding availability basis.
Notes
Workplan in FY2025
-
26 and FY2026
-
27 is for on
-
call maintenance and repair contracts related to the city's storm drain infrastructure as needed.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Improvements
245,000
100,000
0 0
0 0
0 TOTAL
$
245,000
$
1 00,000
$0
$0
$0
$0
$200,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
General
Government
CIP Fund
145,000
0 0
0 0
0 145,000
Strom Drain
General Fund
100,000
100,000
200,000
TOTAL
245,000
$
1 00,000
$0
$0
$0
$0
$
345
,000
70 Citywide Green Infrastructure
Improvement
Project No.
New
Project Description
The project provides for the feasibility study, design and implementation of the Green Stormwater Infrastructure (GSI) to reduce the storm water pollutant loads, control runoff volumes, and improve water quality in the local waterways. Under Municipal Regi
onal Stormwater Permit (MRP) 3.0, Provision C.3.j, SCVURPPP requires approximately 46.09 acres of impervious surface across the County of Santa Clara to be retrofitted with GSI during th
is
permit term. The City of Milpitas is required for retrofitting 5.0 acres by June 30, 2027.
Notes
Funding request in FY2026
-
27 is for the feasibility study and design.
Estimated Cost
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Design
0 150,000
0 0
0 0
150,000
Administration
0 50,000
0 0
0 0
50,000
Inspection
0 0
0 0
0 0
0 Improvements
0 0
0 0
0 0
0 TOTAL
$0
$200,000
$0
$0
$0
$0
$200,000
Funding Source
Phase
Prior Year
FY2026
-
27 FY2027
-
28 FY2028
-
29 FY2029
-
30 FY2030
-
31 Total
Storm Drain
General
Fund
0 200,000
0 0
0 0
200,000
TOTAL
$0
$200,000
$0
$0
$0
$0
$200,000
71 Planned Projects Without Funding
"Planned Projects Without Funding” section identifies long -
term infrastructure needs in the City. These
projects are not included within the 5
-
year Capital Budget and are considered as lower priority, funding is not available or have an implementation sche
dule of 6 years and beyond. Projects will be considered annually to move within the 5
-
year budget cycle based on project priority and available funding.
Project Categories
Ex. Infrastructure
Repair/Replacement
Backlog
New
Infrastructure
Total
Community Improvement
$32,800,000
$220,550,000
$253,350,000
Park Improvement
$5,680,000
$66,820,000
$72,500,000
Street Improvement
$9,000,000
$125,900,000
$134,900,000
Water Improvement
$54,000,000
0 $54,000,000
Sewer Improvement
$61,600,000
0 $61,600,000
Strom Improvement
$57,800,000
0 $57,800,000
TOTAL
$220,880,000
$413,270,000
$634,150,000
72 Planned Project Without Funding
Community Improvements
Fire Station No. 1 Building and Site Improvement
Estimated Cost: $7.0M
This project provides for the building and site improvements at FS No. 1.
The mechanical, lighting, roof, and window systems, and the site pavement, have reached the end of their
service life.
Project added to the CIP
on July 1, 2020
Computer
-
Aided Dispatch Replacement
Estimated Cost: $3.0M
The project provides for the design and replacement of the Computer -
Aided Dispatch system, which has exceeded its service life.
Project added to the CIP
on July 1, 2023
PD/PW Building Improvements
Estimated Cost: $200M
This project provides for the design and construction of a new PD/IT facility at a new site and the renovation of the existing facility for PW operation. Various elements of the building and the warehouses have reached the end of their service life or are not in compliance with code.
Project added to the CIP
on July 1, 2020
Performing Arts Center
Estimated Cost: $0.5M
This project
provides for the evaluation of land acquisition and financing for a future facility, as well as conceptual designs and renderings of a Performing Arts Center based on the Feasibility Study.
Project added to the CIP
on July 1, 2020
Fire Station No. 3 Replacement
Estimated Cost: $20.0M
This project provides for the design and construction of a new Fire Station No. 3, which has reached the end of its service life.
Project added to the CIP
on July 1, 2016
Police Firearms Range Improvements
Estimated Cost: $1.0M
This project provides for improvements to the Police Firearms Range in Alameda County.
Project added to the CIP
on July 1, 2024
Energy Management System Upgrades at PD/PW Building & City Hall
Estimated Cost: $3.0M
This project provides for the replacement and upgrades of the Energy Management System (EMS) at City Hall and the PD/PW Building.
Project added to the CIP
on July 1,
2021
Metro Community Facility Building
Estimated Cost: $16.2M
This project provides for the design and construction of a new satellite community center/recreation facility within the Milpitas Metro Specific Plan area.
Project added to the CIP
on
July 1, 2019
73 Planned Project Without Funding
Community Improvements (continued)
Railroad Quiet Zone Feasibility Study
Estimated Cost: $300k
The project provides for a feasibility study of the Railroad Quiet Zone along portions of the UPRR Warm
Springs corridor within the City of
Milpitas.
Project added to the CIP
on July 1, 2021
Citywide Fuel Storage Tank Improvements
Estimated Cost: $1.0M
The Project provides for the assessment, repairs, and replacement of 27 underground and above
ground storage fuel tanks with capacities ranging
from 400 to 10,000 gallons.
Project added to the CIP
on July 1, 2025
Public Works Parking Facility Improvements
Estimated Cost: $850k
The Project provides for design and expansion of parking facilities at the City of Milpitas Public Works Department
Project added to the CIP
on July 1, 2026
74 Planned Project Without Funding
Park Improvements
Higuera Adobe Caretaker Cottage Renovation
Estimated Cost: $200k
This project provides for the interior and exterior restoration of the Higuera Adobe Park caretaker cottage.
Project added to the CIP
on July 1, 2016
Ben Rogers Park Renovation
Estimated Cost: $4.3M
This project
provides for the design and construction of improvements at Ben Rogers Park. Improvements may include picnic and playground areas, ADA access and pathways, pedestrian lighting, irrigation and landscaping, site furnishing replacement, and restroom installat ion.
Project added to the CIP
on July 1, 2017
Calle Oriente Park Improvements
Estimated Cost: $460k
This project provides for the design and construction of improvements at Calle Oriente Park. Improvements may include landscape and irrigation renovation, and site lighting replacement.
Project added to the CIP
on July 1, 2022
Calaveras Ridge Park
Estimated Cost: $1.7M
This project provides for the design and construction of a new park on a City
-
owned parcel on Calaveras Ridge Drive. The
park may include ADA
pathways, landscaping, irrigation, picnic areas, and improvements to interpretive displays.
Project added to the CIP
on July 1, 2018
Cardoza Park Improvements
Estimated Cost: $340k
This project provides for the design and
construction of improvements at
Cardoza Park. Improvements may include picnic areas, ADA access and pathways, irrigation and landscaping, site furnishing replacement, and restroom renovation.
Project added to the CIP
on July 1, 2022
Dixon Landing
Park Renovation
Estimated Cost: $4.1M
This project provides for the design and construction of improvements at Dixon Landing Park. Improvements may include picnic and playground areas, irrigation and landscaping, site furnishing replacement, parking lot
improvements, sport court and field upgrades, and restroom renovation.
Project added to the CIP
on July 1, 2017
Foothill Park Renovation
Estimated Cost: $2.4M
This project provides for the design and construction of improvements at Foothill Park. Improvements may include picnic and playground areas, ADA access and pathways, pedestrian lighting, irrigation and landscaping, and restroom renovation.
Project added to the CIP
on July 1, 2017
75 Planned Project Without Funding
Park Improvements (continued)
Hall Memorial Renovation
Estimated Cost: $5.0M
This project provides for the design and construction of improvements at Hall Memorial Park. Improvements may include picnic and playground areas, ADA access and pathways, pedestrian
lighting, irrigation and
landscaping, utilities, site furnishing replacement, parking lot improvements, sport court upgrades, and restroom renovation.
Project added to the CIP
on July 1, 2022
Hidden Lake Park Renovation
Estimated Cost: $1.8M
This
project provides for the design and construction of improvements at Hidden Lake Park. Improvements may include picnic areas, ADA access, pathways, lighting, irrigation, landscaping and shade tree installation.
Project added to the CIP
on July 1, 2017
Hillcrest Park Renovation
Estimated Cost: $2.8M
This project provides for the design and construction of improvements at Hillcrest Park. Improvements may include open space and picnic areas, ADA access and pathways, pedestrian lighting, irrigation and landscaping, utility improvements, site furnishing r
eplacement, and restroom
installation.
Project added to the CIP
on July 1, 2022
John McDermott Park Renovation
Estimated Cost: $520k
This project provides for the design and construction of improvements at
John McDermott Park. Improvements may include open space, picnic and playground areas, irrigation and landscaping, replacement of site furnishings, and restroom renovations.
Project added to the CIP
on July 1, 2022
Milpitas Sports
Center Complex Improvements
Estimated Cost: $3.5M
This project provides for the design and construction of improvements at the Milpitas Sport Center Complex. Improvements may include ADA and vehicular access and pathways, storm drainage
improvements, irrigation
and landscaping, sport field amenities, and site furnishing replacement.
Project added to the CIP
on July 1, 2020
Murphy Park Renovation
Estimated Cost: $4.6M
This project provides for the design and construction of improvements at
the Milpitas Sport Center Complex. Improvements may include ADA and vehicular access and pathways, storm drainage improvements, irrigation and landscaping, sport field amenities, and site furnishing replacement.
Project added to the CIP
on July 1, 2009
76 Planned Project Without Funding
Park Improvements (continued)
Oliver W. Jones Memorial Park Renovation
Estimated Cost: $1.75M
This project provides for the design and construction of improvements at Oliver W. Jones Memorial Park.
Improvements may include open space
and picnic areas, ADA access and pathways, pedestrian lighting, irrigation and landscaping, utility improvements, site furnishing replacement, and restroom installation.
Project added to the CIP
on July 1, 2022
Parc Metro Central Park Improvements
Estimated Cost: $370k
This project provides for the design and construction of improvements at Parc Metro Central Park. Improvements may include open space and playground areas, irrigation and landscaping, and replacement of site furnishings.
Project added to the CIP
on July 1, 2022
Parc Metro East Park Improvements
Estimated Cost: $580k
This project provides for the design and construction of improvements at Parc Metro East Park. Improvements may include open
space and
playground areas, irrigation and landscaping, replacement of site furnishings, and restroom renovation.
Project added to the CIP
on July 1, 2022
Parc Metro West Park Improvements
Estimated Cost: $700k
This project provides for the design
and construction of improvements at
Parc Metro West Park. Improvements may include open space and playground areas, irrigation and landscaping, replacement of site furnishings, and restroom renovation.
Project added to the CIP
on July 1, 2022
Pecot (Bob) Park Improvements
Estimated Cost: $630k
This project provides for the design and construction of improvements at Pecot Park. Improvements may include ADA access and pathways, irrigation and landscaping, and the installation and replacement of site furnishings.
Project added to the CIP
on July 1, 2022
Pinewood Park Improvements
Estimated Cost: $180k
This project provides for the design and construction of improvements at Pinewood Park. Improvements may include restroom renovations and a playground area.
Project added to the CIP
on July 1, 2022
77 Planned Project Without Funding
Park Improvements (continued)
Rose Garden with Children’s Memorial
Estimated Cost: $300k
This project provides for the design and construction of a Rose Garden at
a suitable location. Work includes landscaping, irrigation, hardscaping, a children's memorial monument, and community outreach.
Project added to the CIP
on July 1, 2022
Selwyn Park Improvements
Estimated Cost: $800k
This project
provides for the design and construction of improvements at Selwyn Park. Improvements may include picnic and playground areas, irrigation and landscaping, and replacement of site furnishings.
Project added to the CIP
on July 1, 2022
Peter D. Gill
Park Renovation
Estimated Cost: $4.0M
This project provides for the design and construction of improvements at Peter D. Gill Memorial Park. Improvements may include open space, picnic and playground areas, irrigation and landscaping, replacement of
site furnishings, parking lot improvements, sport court and field upgrades, and restroom renovations.
Project added to the CIP
on July 1, 2017
Robert E. Browne Park Renovation
Estimated Cost: $3.5M
This project provides for the
design and construction of improvements at
Robert E. Browne Park. Improvements may include open space, picnic and playground areas, ADA access and pathways, pedestrian lighting, utilities, irrigation and landscaping, site furnishings replacement, sport cou
rt upgrades, and restroom installation.
Project added to the CIP
on July 1, 2017
Sinnott Park Renovation
Estimated Cost: $4.0M
This project provides for the design and construction of improvements at Sinnott Park. Improvements may include open
space, playgrounds and
picnic areas, ADA access and pathways, pedestrian lighting, irrigation and landscaping, utility improvements, replacement of site furnishings, installation of a sport court, and restroom upgrades.
Project added to the CIP
on July 1, 2015
Starlite Park Renovation
Estimated Cost: $3.45M
This project provides for the design and construction of improvements at Starlite Park. Improvements may include open space, playgrounds, and picnic areas; ADA access and pathways;
irrigation and landscaping; utility
improvements; site furnishings replacement; and restroom renovations.
Project added to the CIP
on July 1, 2015
78 Planned Project Without Funding
Park Improvements (continued)
Sunnyhills Albert Augustine Jr.
Memorial Park Renovation
Estimated Cost: $5.6M
This project provides for the design and construction of improvements at Sunnyhills Albert Augustine J. Memorial Park. Improvements may include open space, playground, and picnic areas, ADA access and pathways, pedestrian lighting, irrigation and landscapi
ng, utility improvements, site
furnishing replacement, parking lot improvements, and restroom upgrades.
Project added to the CIP
on July 1, 2022
Strickroth Park Renovation
Estimated Cost: $5.0M
This
project provides for the design and construction of improvements at Strickroth Park. Improvements may include open space, playgrounds, and picnic areas; ADA access and pathways; pedestrian lighting; irrigation and landscaping; utility improvements; site fu
rnishings replacement; parking
lot improvements; and restroom installation.
Project added to the CIP
on July 1, 2022
Tom Evatt Park Improvements
Estimated Cost: $270k
This project provides for the design and construction of improvements at Tom
Evatt Park. Improvements may include playground areas, irrigation and landscaping, and replacement of site furnishings.
Project added to the CIP
on July 1, 2022
Sports Center Synthetic Fields Replacement
Estimated Cost: $2.65M
This project
provides for the replacement of the synthetic football and soccer fields at the Sports Center Complex, installed in 2016. Life expectancy field is approximately 15 years.
Project added to the CIP
on July 1, 2021
Cardoza Park/Dixon Landing Parks Improvements
Estimated Cost: $
7M
This project provides for
installation of 4 softball fields at Cardoza
Park/Dixon Landing.
Project added to the CIP
on July 1, 202
6
79 Planned Project Without Funding
Street Improvements
TraƯic Signal Installation
Estimated Cost: $700k
This project provides for the design and construction of a new traƯic signal system. Possible locations include Milpitas Blvd. & Tramway Dr., S.
Park Victoria Dr. & Mt. Shasta Ave., N. Park Victoria Dr. & Kennedy Dr., and elsewhere.
Project added to the CIP
on July 1, 2008
Trail Amenity Improvements
Estimated Cost: $3.9M
This project provides for the design and construction of trailhead amenities in the short term, as identified as a high priority and feasibility category in
the adopted Trail, Pedestrian, and Bicycle Master Plan, dated May 2022.
Project added to the CIP
on July 1, 2023
Montague Expressway Widening
–
West
Estimated Cost: $20.2M
This project provides for the City's fair share contribution to the County for streetscape improvements and widening the road on Montague Expy from Great Mall Pkwy to S. Main St. The fair share goal from TASP Impact Fees for streetscape and widening improvement is estimated at $12.3M (DB#6) and $7.9M (DB#2), respectively.
Project added to the CIP
on July 1, 2019
Railroad Ct. Bridge Replacement
Estimated Cost: $5.0M
This project provides for the design and replacement of the vehicle bridge at Railroad Court as recommended in the Bridge Preventive Maintenance Program report
dated April 20, 2022, at Cornerstone.
Project added to the CIP
on July 1, 2023
Gill Park Pedestrian Bridge Replacement
Estimated Cost: $4.0M
This project provides for the design and replacement of 4 pedestrian bridges over Tularcitos Creek at
Canada Dr., Alcosta Dr., Pacheco Dr., and
Terra Bella adjacent to Gill Park, as recommended in the Bridge Preventive Maintenance Program report dated April 20, 2022, at Cornerstone.
Project added to the CIP
on July 1, 2023
Pedestrian Short
-
Term
Improvements
Estimated Cost: $54.7M
This project provides for the design and construction of short -
term
pedestrian improvements, identified as a high priority and in the feasibility category in the adopted Trail, Pedestrian, and Bicycle Master Plan, dated
May 2022.
Project added to the CIP
on July 1, 2023
80 Planned Project Without Funding
Street Improvements (continued)
Linear Bikeway Short
-
Term Improvements
Estimated Cost: $11.5M
This project provides for the design and construction of short
-
term linear
bikeway improvements, identified as high priority and with a feasibility category recommended in the adopted Trail, Pedestrian, and Bicycle Master Plan, dated May 2022.
Project added to the CIP
on July 1, 2023
Bicycle
Short
-
Term Improvements
Estimated Cost: $1.1M
This project provides for the design and construction of short -
term bicycle
improvements identified as high priority and in the feasibility category, as recommended in the adopted Trail, Pedestrian, and Bicycle Master Plan, dated May 2022.
Project added to the CIP
on July 1, 2023
TraƯic Safety Improvements
Estimated Cost: $7.5M
This project provides for the design and construction of traƯic safety improvements at 25 locations identified in the
adopted Travel Safety Plan
dated December 2023.
Project added to the CIP
on July 1, 2024
Montague Pedestrian Overcrossing at Penitencia
Estimated Cost: $21.5
This project provides for the design and construction of pedestrian overcrossing over
Montagues Expressway adjacent to east of Penitencia
Creek channel.
Project added to the CIP
on July 1, 2016
Main St. Street Light Project
Estimated Cost: $4.8M
This project provides for the design and construction of Midtown decorative streetlights and signal improvements along South Main Street from Carlo Street to Great Mall Parkway.
Project added to the CIP
on July 1, 2016
81 Planned Project Without
Funding
Water Improvements
Asset Renewal and Replacement Program
Estimated Cost: $43.0M
This project provides for the assessment, renewal, improvement, or replacement of the City's aging water infrastructure, as recommended in the adopted Water
Master Plan Update, dated June 2021.
Project added to the CIP
on July 1, 2023
Curtis Well Facility
Estimated Cost: $6.0M
This project provides for the design and construction of the Curtis Well facility, as recommended in the adopted Water Master
Plan Update, dated
June 2021.
Project added to the CIP
on July 1, 2023
Fire Flow Improvements
Estimated Cost: $3.9M
This project provides for the design and construction of upsizing several water mains, the installation of a backup generator, and the installation of
a PRV to improve the water system for fire flow, as recommended in the adopted Water Master Plan Update, dated June 2021.
Project added to the CIP
on July 1, 2023
Lower Berryessa Creek Water Line
Estimated Cost: $1.1M
This Project
provides for the design and replacement of an existing 14 -
inch diameter water line beneath Lower Berryessa Creek to accommodate future improvements within the existing creek corridor.
Project added to the CIP
on July 1, 2025
Sewer Improvements
Sanitary Sewer CCTV Inspections & Improvements
Estimated Cost: $44.6M
This project provides for Closed
-
Circuit Television (CCTV) inspection of
medium
-
to extreme
-
risk 24
-
inch
-
diameter or greater sewer pipelines and
for repair of defects discovered during the
inspection, as recommended
per the adopted Sewer Master Plan, dated August 2022.
Project added to the CIP
on July 1, 2023
Sanitary Sewer Pipeline Improvements
Estimated Cost: $17.0M
This project provides for the design and construction of sewer pipe segments with significant defects and is considered an extreme risk, with the greatest likelihood of deterioration and the highest consequences of failure, as recommended in the adopted Sewer Master Plan, dated August 2021.
Project added to the CIP
on July 1, 2023
82 Planned Project Without Funding
Storm Drain Improvements
Channel and Lagoon Dredging
Estimated Cost: $1.5M
This project provides for the removal of debris and deposited soil from City
-
owned channels and lagoons. The City owns the channel
that
parallels I
-
880 from Redwood Avenue to California Circle and lagoons at Hidden Lake, Hall, and California Circle.
Project added to the CIP
on June 2, 2019
Penitencia Pump Station Replacement
Estimated Cost: $10.0M
This project provides for the
design and replacement of the Penitencia
Pump Station at Hall Memorial Park, as recommended in the adopted Master Plan dated October 22, 2021.
Project added to the CIP
on July 1, 2012
Jurgens Pump Station Replacement
Estimated Cost: $15.0M
This
project provides for the design and replacement of the Jurgens Pump Station, as recommended in the adopted Master Plan dated October 22, 2021.
Project added to the CIP
on July 1, 2017
Storm Drain Pipeline Capacity Improvements
–
High Priority
Estimated Cost: $15.8M
This project provides for the design and construction of storm drain pipelines to increase capacity, as identified as a high priority in the adopted Master Plan, dated October 22, 2021.
Project added to the CIP
on July 1, 2023
Storm Drain Pipeline Capacity Improvements
–
Low Priority
Estimated Cost: $12.4M
This project provides for the design and construction of storm drain pipelines to increase capacity and creek maintenance, as identified as a low priority in the adopted Master Plan, dated October 22, 2021.
Project added to the CIP
on July 1, 2023
Storm Drain Pipeline Extension Improvements
Estimated Cost: $500k
This project provides for the design and construction of a storm drain pipeline extension as identified in the
adopted Master Plan, dated
October 22, 2021.
Project added to the CIP
on July 1, 2023
Storm Drain Pump Station Improvements
Estimated Cost: $2.6M
This project provides for the design and construction of improvements at the Abbott, Murphy, Oak, and
Spence pump stations, as identified in the
adopted Master Plan dated October 22, 2021.
Project added to the CIP
on July 1, 2023