rental agreements across the organization to fill this unmet demand while departments wait for the vehicle and equipment purchases to be fulfilled.
On October 10, 2023, under Resolution 2023-443, Council approved the award of bids for rental equipment services to Herc Rentals, Modesto, CA; Holt of California, Salida, CA; Sunbelt Rentals, Ceres, CA; and United Rentals, Modesto, CA.
DISCUSSION:
The Public Works, Fleet Division is requesting an increase in funding to address the community and internal customer service requirements based on estimated costs incurred during the 2023- 2024 fiscal year. The City has increased services through Measure H as well as grant funded programs which has impacted the approved budget for temporary fleet equipment rentals.
Additionally, market conditions, increased costs for materials and labor have impacted the annual expenditure rates for these goods and services.
Modesto Municipal Code Section 8-3.203 generally requires all purchases which meet or exceed $100,000 for material, equipment, or contractual services to be formally bid. However, exceptions to the formal bidding process are granted in MMC 8-3.204 (f) “Where the Purchasing Manager, in his or her discretion, determines that it is appropriate to amend the services or goods provided under an existing agreement to include additional similar goods or services, of limited quantity or scope, in order to increase efficiency and avoid delays or disruptions to City projects or services. With the increase of rentals due to additional funding sources and the competitive pricing already obtained through these agreements, the increase of these agreements amount will ensure the City obtains discount pricing.
FISCAL IMPACT:
Due to the ongoing service needs, additional funding in the amount of $200,000 will be required to maintain service levels for the duration of this agreement. The service agreements with Herc Rentals, Holt of California, and United Rentals related to this agreement are paid from various City Departments that require additional temporary equipment.
Vendor Total Spend YTD Average Annual
Holt of CA $72,300 $109,000
United Rental (North America) Inc. $20,500 $50,000
Herc Rental $226,700 $341,000
Totals $319,500 $500,000
The agreements anticipate an annual increase on the Consumer Price Index for the West Region. Based on the current annual spending with various programs increasing from Measure H, it is anticipated the annual average spending will be $600,000 annually with increases estimated due to inflation, increase usage due to Measure H and supply demands ranging from 5-8% for an overall not to exceed an amount of $3,000,000. The costs associated with these increases will be paid from the current operating budget from the department that is utilizing the rental services.
#4..
- 235 -
Finance Committee, May 20, 2024
First Amendment to the Agreements for Rental Fleet Services
RECOMMENDED COMMITTEE ACTION:
Staff Recommendations:
Motion recommending the First Amendment for the Agreements with Herc Rentals, Modesto, CA, Holt of California, Salida, CA, and United Rentals, Modesto, CA, for Rental Fleet Services for the Agreements for an annual estimated cost increase of $200,000 from $400,00 to $600,00 and a total revised not to exceed a total amount of $3,000,000 and forwarding to Council for approval.
Approved by:
Bill Sandhu, Public Works Director
Joseph P. Lopez, City Manager
Attachments:
1. Amendment #1 – Herc Rentals
2. Amendment #1 – Holt of California
3. Amendment #1 – United Rentals
4. Agreement – Herc Rentals
5. Agreement – Holt of California
6. Agreement – United Rentals
#4..
- 236 -
1 FIRST AMENDMENT TO AGREEMENT
FOR RENTAL SERVICES HERC RENTALS, INC.
This first amendment to the Agreement for Rental Services, hereinafter referred to as the FIRST AMENDMENT, is made and entered into in the City of Modesto, State of California, this ____ day of_____________, 2024, by and between the City of Modesto, a municipal corporation of the State of California, hereinafter referred to as CITY, and HERC RENTALS INC., a corporation of North Carolina, hereinafter referred to as CONTRACTOR.
This FIRST AMENDMENT to the AGREEMENT is made with reference to the following recitals:
A. Agreement No. 254686, hereinafter referred to as AGREEMENT, was entered into by and between CITY and CONTRACTOR on the 10th day of October 2023 for rental services.
B. The CITY and CONTRACTOR desire to amend the AGREEMENT by increasing the previously approved sum not to exceed by $500,000 to a revised sum not to exceed $1,750,000 through the term of the agreement.
C. CITY and CONTRACTOR now desire to memorialize the change to the terms of the AGREEMENT with this FIRST AMENDMENT.
NOW, THEREFORE, the parties hereto mutually agree to the following:
1. Section 1(d) “Compensation” shall be amended to increase the estimated annual amount spent of $341,000, and total sum not to exceed by $500,000 to a revised sum not to exceed $1,750,000.
2. Except as modified and amended by this FIRST AMENDMENT to the AGREEMENT, all other provisions of the Agreement and Amendment shall remain unchanged and in full force and effect.
#4..
- 237 -
2 IN WITNESS WHEREOF, the CITY OF MODESTO, a Municipal Corporation, has authorized the execution of this First Amendment to the AGREEMENT in duplicate by its City Manager and attested by its City Clerk under authority of Resolution No. , adopted by the Council of the City of Modesto on the ___ day of ___________, 2024, and HERC RENTALS INC., a corporation of North Carolina, has caused this First Amendment to the Agreement to be duly executed.
#4..
- 238 -
1 FIRST AMENDMENT TO AGREEMENT
FOR RENTAL SERVICES HOLT RENTALS (NORTH AMERICA), INC.
This first amendment to the Agreement for Rental Services, hereinafter referred to as the FIRST AMENDMENT, is made and entered into in the City of Modesto, State of California, this ____ day of_____________, 2024, by and between the City of Modesto, a municipal corporation of the State of California, hereinafter referred to as CITY, and HOLT of CALIFORNIA, INC., a corporation of Salida, California, hereinafter referred to as CONTRACTOR.
This FIRST AMENDMENT to the AGREEMENT is made with reference to the following recitals:
A. Agreement No. 254718, hereinafter referred to as AGREEMENT, was entered into by and between CITY and CONTRACTOR on the 10th day of October 2023 for rental services.
B. The CITY and CONTRACTOR desire to amend the AGREEMENT by increasing the previously approved sum not to exceed by $75,000 to a revised sum not to exceed $750,000 through the term of the agreement.
C. CITY and CONTRACTOR now desire to memorialize the change to the terms of the AGREEMENT with this FIRST AMENDMENT.
NOW, THEREFORE, the parties hereto mutually agree to the following:
1. Section 3 “Compensation” shall be amended to increase estimated annual amount spent of $341,000, and total the sum not to exceed by $75,000 to a revised sum not to exceed $750,000.
2. Except as modified and amended by this FIRST AMENDMENT to the AGREEMENT, all other provisions of the Agreement and Amendment shall remain unchanged and in full force and #4..
- 239 -
2 effect.
IN WITNESS WHEREOF, the CITY OF MODESTO, a Municipal Corporation, has authorized the execution of this First Amendment to the AGREEMENT in duplicate by its City Manager and attested by its City Clerk under authority of Resolution No. , adopted by the Council of the City of Modesto on the ___ day of ___________, 2024, and HOLT of CALIFORNIA, INC., a corporation of Salida, California, has caused this First Amendment to the Agreement to be duly executed.
#4..
- 240 -
1 FIRST AMENDMENT TO AGREEMENT
FOR RENTAL SERVICES UNITED RENTALS (NORTH AMERICA), INC.
This first amendment to the Agreement for Rental Services, hereinafter referred to as the FIRST AMENDMENT, is made and entered into in the City of Modesto, State of California, this ____ day of_____________, 2024, by and between the City of Modesto, a municipal corporation of the State of California, hereinafter referred to as CITY, and UNITED RENTALS (NORTH AMERICA), INC., a corporation of Stamford, Connecticut, hereinafter referred to as CONTRACTOR.
This FIRST AMENDMENT to the AGREEMENT is made with reference to the following recitals:
A. Agreement No. 254718, hereinafter referred to as AGREEMENT, was entered into by and between CITY and CONTRACTOR on the 10th day of October 2023 for rental services.
B. The CITY and CONTRACTOR desire to amend the AGREEMENT by increasing the previously approved sum not to exceed by $25,000 to a revised sum not to exceed $500,000 through the term of the agreement.
C. CITY and CONTRACTOR now desire to memorialize the change to the terms of the AGREEMENT with this FIRST AMENDMENT.
NOW, THEREFORE, the parties hereto mutually agree to the following:
1. Section 1(e) “Compensation” shall be amended to increase the estimated annual amount spent of $50,000, and total sum not to exceed by $125,000 to a revised sum not to exceed $500,000.
2. Except as modified and amended by this FIRST AMENDMENT to the AGREEMENT, all other provisions of the Agreement and Amendment shall remain unchanged and in full force and effect.
#4..
- 241 -
2 IN WITNESS WHEREOF, the CITY OF MODESTO, a Municipal Corporation, has authorized the execution of this First Amendment to the AGREEMENT in duplicate by its City Manager and attested by its City Clerk under authority of Resolution No. , adopted by the Council of the City of Modesto on the ___ day of ___________, 2024, and UNITED RENTALS (NORTH AMERICA), INC., a corporation of Stamford Connecticut, has caused this First Amendment to the Agreement to be duly executed.
#4..
- 242 -
#4..
- 243 -
#4..
- 244 -
#4..
- 245 -
#4..
- 246 -
#4..
- 247 -
#4..
- 248 -
#4..
- 249 -
#4..
- 250 -
#4..
- 251 -
#4..
- 252 -
#4..
- 253 -
#4..
- 254 -
#4..
- 255 -
#4..
- 256 -
#4..
- 257 -
#4..
- 258 -
#4..
- 259 -
AGREEMENT TRANSMITTAL SHEET
Subject of Agreement: Vendor Name: Division:
Contact Person: Extension: Attorney Reviewer Name:
The attached agreement is the final agreement approved by Council on and pulled from Unity for routing via DocuSign.
The attached agreement is the final version approved through the under $50,000 Unity Workflow review and pulled from Unity for routing via DocuSign.
PINS Approval Business License
Council Agenda Report 700 Form (for Consultants)
Signed or Unsigned Resolution W-9
Council Meeting Minutes (Only if unsigned
Resolution is provided)
#4..
- 260 -
1 ANNUAL AGREEMENT #254718 FOR RENTAL SERVICES
UNITED RENTALS (NORTH AMERICA), INC.
This agreement, hereinafter called AGREEMENT, made and entered into in the City of Modesto, State of California, this ______ day of _________, 2023, by and between the City of Modesto, a municipal corporation of the State of California, hereinafter called CITY, and United Rentals of North America, of Stamford, CT, hereinafter called CONTRACTOR.
W I T N E S E T H:
WHEREAS, the Modesto City Council adopted Resolution No. 2023- authorizing the Award of Bid and agreement for the Equipment Rental with Related Services to CONTRACTOR, attached hereto as Exhibit “A” and made a part hereof, and
WHEREAS, the CONTRACTOR provided a responsive and responsible submittal that best meets the CITY needs, see provided Price List attached hereto as Exhibit “B” and made a part hereof, and WHEREAS, the CITY and CONTRACTOR shall enter into an agreement for the Equipment Rental with Related Services as described in IFB 2324-08, attached hereto as Exhibit “C” and made a part hereof (hereinafter called IFB).
NOW, THEREFORE, the parties hereto mutually agree as follows:
#4..
- 261 -
2 1. THE WORK:
a) CONTRACTOR shall furnish all labor, materials, equipment, fuel, tools, and insurance necessary to perform and complete the required work as specified in Exhibit “C”, and in strict accordance with the conditions of the complete AGREEMENT. b) CONTRACTOR shall do and perform the work contemplated hereby in a good workmanlike manner under the direction of and to the satisfaction of the CITY Representative. c) CONTRACTOR shall maintain proper insurance with the CITY for the duration of the AGREEMENT.
d) CONTRACTOR shall maintain a CITY business license for the duration of the AGREEMENT.
e) CONTRACTOR shall furnish said services at the following AGREEMENT rates for an estimated annual amount $75,000. The total amount paid by CITY to CONTRACTOR over the full term of the AGREEMENT shall not exceed $375,000. Unless the services provided are for a lump sum or flat fee, fees for work performed by CONTRACTOR on an hourly basis shall not exceed the amounts shown on Bid attached hereto as Exhibit B.
AGREEMENT PRICING
See attached Exhibit B
3. CITY REPRESENTATIVE:
CITY Representative is: David Barr, Fleet Manager Phone (209) 342-2214 Email:
[email protected] The CITY Representative is not authorized to commit the CITY to changes in specifications, requirements, or scope of work, changes in price(s), period of performance or delivery date(s) or method of shipment. Changes of a contractual or business nature shall be effective only by written change to the AGREEMENT, issued by the City of Modesto, Purchasing Division. #4..
- 262 -
3 4. TERM OF AGREEMENT:
The term of the AGREEMENT shall be for a period of one year, with four one-year extension options at the sole discretion of CITY, for a total of up to five years.
Year 1: September 26, 2023, through September 25, 2024
Year 2: September 26, 2024, through September 25, 2025
Year 3: September 26, 2025, through September 25, 2026
Year 4: September 26, 2026, through September 25, 2027
Year 5: September 26, 2027, through September 25, 2028
Pricing as set forth in Section 1.e. above shall remain firm for the first two years of the AGREEMENT.
Price increases for any subsequent AGREEMENT years following the first year, shall not exceed the percentage change in the Consumer Price Index (CPI) for the City of Modesto West Urban Area in any one AGREEMENT year, and shall be negotiated through the Purchasing Division. Requests for price increases shall be submitted by CONTRACTOR in writing, 90 days prior to the annual anniversary date of the AGREEMENT to be effective for the subsequent year.
5. LIABILITY INSURANCE:
The CONTRACTOR shall provide, at its own expense, and maintain at all times the following insurance with insurance companies licensed in the State of California and shall provide evidence of such insurance to the CITY as may be required by the City Clerk of the CITY. The policies or certificates thereof shall provide that, at least 30 days prior to cancellation or material change in the policy, notices of same shall be given to the Risk Manager of the CITY via PINS Advantage Insurance Program, for all of the following stated insurance policies.
a. General Liability - insurance with a minimum limit of liability per occurrence of $1,000,000 for bodily injury and property damage. The insurance shall indicate on the certificate of insurance the following coverage and indicate the policy aggregate limit applying to: premises and operations; broad form contractual; independent contractors and subcontractors; products and completed operations; and/or professional liability. b. Automobile Liability – insurance with a minimum limit of liability per occurrence of $1,000,000 #4..
- 263 -
4 for bodily injury and property damage and transportation related pollution liability. This insurance shall cover any automobile for bodily injury and property damage.
c. Workers' Compensation - in compliance with the statutes of the State of California, plus employer's liability with a minimum limit of liability of $1,000,000 per accident for bodily injury or disease.
If at any time any of said policies shall be unsatisfactory to the CITY, as to form or substance or if a company issuing such policy shall be unsatisfactory to the CITY, the CONTRACTOR shall promptly obtain a new policy, submit the same to the CITY’s Risk Manager for approval and submit a certificate thereof as hereinabove provided. Upon failure of the CONTRACTOR to furnish, deliver or maintain such insurance and certificates as above provided, this AGREEMENT, at the election of the CITY, may be forthwith declared suspended, or terminated. Failure of the CONTRACTOR to obtain and/or maintain any required insurance shall not relieve the CONTRACTOR from any liability under this Agreement, nor shall the insurance requirements be construed to conflict with or otherwise limit the obligations of the CONTRACTOR concerning indemnification.
The CITY, its agents, officers, employees, and volunteers shall be named as an additional insured on all insurance policies required herein, except Workers' Compensation.
The Workers' Compensation insurer shall agree to waive all rights of subrogation against the CITY, its agents, officers, employees, and volunteers for losses arising from work performed by CONTRACTOR for the CITY.
The CONTRACTOR’s insurance policy(ices) shall include a provision that the coverage is primary as respects the CITY; shall include no special limitations to coverage provided to additional insured; and, shall be placed with insurer(s) with acceptable Best's rating of A-:VII or with approval of the CITY’s Risk Manager.
For any claims related to this AGREEMENT, the CONTRACTOR’s insurance coverage shall be primary insurance as respects CITY, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by CITY, its officers, officials, employees, or volunteers shall be excess of the CONTRACTOR’s insurance and shall not contribute with it.
7. PAYMENT:
#4..
- 264 -
5 CONTRACTOR shall invoice CITY not less than once per month based on the cost for services performed and reimbursable costs incurred prior to the invoice date. All invoices shall be paid in full the following payment terms within thirty days after completion and acceptance of the Services by the CITY, and receipt of a properly prepared invoice, CITY will pay CONTRACTOR Net 45 Days via manual check. The CITY is exempt from payment of Federal Excise Tax, and all invoices shall be exclusive of such excise tax.
Invoice to: City of Modesto
Attn: Accounts Payable
P.O. Box 642
Modesto, CA 95353
Email to: [email protected]
At a minimum, invoices shall state the following: This AGREEMENT #254718 CITY department/division name and address Billing period Service hours worked day and week Unit price, extended price, sales tax and total
8. INDEMNITY: The CONTRACTOR shall hold the CITY, its agents, officials, officers, employees, and volunteers, harmless from and save, defend and indemnify them against any and all claims, losses, liabilities, judgments or damages from every cause, including but not limited to injury to person or property or wrongful death, including reasonable costs and expenses of defense of any judicial or administrative action, caused by the negligent or intentional act or omission of CONTRACTOR, or its agents, officials, officers, employees, or volunteers relating to or during the performance of its obligations under this AGREEMENT.
CONTRACTOR’s obligation to defend, indemnify, and hold the CITY, its agents, officials, officers, and employees harmless under the provisions of this paragraph is not limited to or restricted by any requirement in this AGREEMENT for CONTRACTOR to procure and maintain a policy of insurance.
9. VENUE & GOVERNING LAW:
#4..
- 265 -
6 Venue for any dispute or claim arising or related to this AGREEMENT its performance, breach, or interpretation (including issues about its validity or enforceability), shall be exclusively in the Superior Court of Stanislaus County or the United States District Court for the Eastern District of California This AGREEMENT shall be deemed made in, governed by, performed in, and construed and enforced in accordance with the laws of the State of California, without giving effect to its conflicts of laws provisions or principles.
10. ATTORNEYS’ FEES: If a party to this AGREEMENT brings any action, including an action for declaratory relief, to enforce or interpret the provision of this AGREEMENT, the prevailing party shall be entitled to reasonable attorneys’ fees in addition to any other relief to which that party may be entitled. The court may set such fees in the same action or in a separate action brought for that purpose.
11. COMMENCEMENT AND COMPLETION OF THE WORK:
The work contemplated herein shall be commenced as immediately after the agreement administrator receives and has on file:
Proofs of insurance (approved by CITY Risk Manager); and Executed Agreement #254718
a. Resolution No.2023-_______;
b. CONTRACTOR Bid submittal;
c. RFP #062320
d. Contractor’s City of Modesto business license
12. TERMINATION OF SERVICES:
Termination for Default: In the event either party fails to perform under this AGREEMENT or breaches any condition contained herein, the other party shall notify in writing the breaching party of the nonperformance. Within 10 days after receipt of notification, the breaching party shall correct any nonperformance to the reasonable satisfaction of the non-breaching party, or such other time as may be identified in the notice. Failure to correct any non-performance shall allow the non-breaching party to terminate this AGREEMENT for cause.
#4..
- 266 -
7 Termination by City for Convenience: The City may also terminate this AGREEMENT the Contractor's performance under the Agreement, either in whole or in part, at its own discretion and without cause.
Post-Termination Procedure
Upon receipt of a written notice of termination pursuant to either of the foregoing paragraphs, the CONTRACTOR shall:
a. Cease its work as directed in the notice of termination as of the termination date and see to it that its employees, subcontractors and agents are notified of such termination and act as specified in the notice of termination; b. Terminate all orders and subcontracts except as necessary to complete any portion of the SERVICES that are not terminated;
c. If directed in writing by the CITY to do so, assign all right, title and interest in subcontracts and materials in progress to CITY, in which case the CITY will have the right at its discretion to settle, or pay any or all claims arising out of the termination of such, but in no event shall recovery by any CONTRACTOR or subcontractor include lost profits for portions of the SERVICES not completed or undertaken, including materials not delivered; d. Deliver or otherwise make available to the CITY all data, drawings, specifications, reports, estimates, summaries and such other information and material as may have been accumulated by the CONTRACTOR in performing the SERVICES whether completed or in process;
e. Settle outstanding liabilities and claims, subject to the approval of CITY; f. Complete performance of such part of the SERVICES as has not been terminated; g. Take such other actions as may be necessary, or as may be directed by the CITY for the protection and preservation of the SERVICES and/or property related to the SERVICES;
h. If CITY so requests, and at CITY's cost, CONTRACTOR shall provide sufficient #4..
- 267 -
8 oral or written status reports to make CITY reasonably aware of the status of CONTRACTOR’s work on the SERVICES.
i. CONTRACTOR understands and agrees that CITY may, in CITY’s sole discretion, refuse to pay CONTRACTOR for that portion of CONTRACTOR's SERVICES which were performed by CONTRACTOR on the project prior to the termination date and which remain unacceptable and/or not useful to CONTRACTOR as of the termination date.
CITY will pay CONTRACTOR for SERVICES actually completed prior to the receipt of the termination notice or otherwise completed in accordance with the notice of termination. The final payment to the CONTRACTOR after termination for convenience shall be limited to amounts due and owing under the AGREEMENT at time of termination, including the following:
a. The cost of settling and paying valid claims arising out of the termination of the SERVICES such as subcontractor agreements or contracts for materials; b. The AGREEMENT price allocable to the portion of the SERVICES properly performed or goods supplied to the work site by the CONTRACTOR as of the date of termination, as determined in accordance with the notice of termination, reduced by any sums previously paid to the CONTRACTOR for such SERVICES.
13. COMPLIANCE WITH ALL LAWS:
CONTRACTOR hereby agrees that CONTRACTOR and its subcontractors, if any, in the performance of the SERVICES described herein, will comply with all federal, state, county and municipal laws, rules and regulations which may be applicable to the work herein contracted for, whether now in existence or hereafter adopted.
14. FAILURE TO PERFORM SATISFACTORY WORK: It is agreed and understood that if the CONTRACTOR fails to perform the SERVICES as specified herein, CITY's representative may:
#4..
- 268 -
9 a. Consent to accept such unsatisfactory service with an appropriate adjustment in contract price, based on established cost factors,
b. Have such required work done by CITY forces or otherwise, and charge the cost thereof to the CONTRACTOR, or
c. Recommend termination of AGREEMENT between said the CONTRACTOR and the City of Modesto.
Those discrepancies and deficiencies in the SERVICES that remains uncorrected after the date set for correction may be the necessary justification for a billing adjustment in the month following the occurrence.
Unless otherwise negotiated, billing adjustments for this incomplete or uncorrected work shall be permanent retention of 100% of the estimated monthly cost for the SERVICES not corrected or completed.
15. ASSIGNMENT OF RIGHTS: The CONTRACTOR offers and agrees, and will require all subcontractors and suppliers to agree, to assign to the CITY all rights, title, and interest in and to all causes of action it and they may have under Section 4 of the Clayton Act (15 United States code, Section 15) or under the Cartwright Act (Business and Professions Code, Section 16700 et seq.), arising from the acquisition of goods, services, or materials pursuant to this AGREEMENT or any allowed subcontract. The assignment made by CONTRACTOR and all assignments made by subcontractors and suppliers shall be made and become effective at the time the CITY makes final payment to The CONTRACTOR, without further acknowledgment by the parties (Government Code, Sections 4550-4554).
16. CITY PROCESS/PROCEDURE APPROVALS: CITY approval of any process or procedure shall not relieve CONTRACTOR of its responsibility to furnish the required SERVICES meeting all specifications contained herein.
17. CONTRACTOR'S RESPONSIBILITY FOR DAMAGES: If CONTRACTOR damages any property belonging to the CITY or a third party, the CONTRACTOR will be required to make repairs immediately, at CONTRACTOR’s sole cost and expense, to the satisfaction of the CITY. In the event that CONTRACTOR fails to perform the necessary repairs, the CITY may either retain from the money due to CONTRACTOR an #4..
- 269 -
10 amount sufficient to repair the damage or perform the repairs and send an invoice to the CONTRACTOR for such costs, which shall be paid within thirty (30) days.
18. NOTICES:
Any notice, payment or instrument required or permitted by this AGREEMENT to be given or delivered to either party shall be deemed to have been received when personally delivered, or one calendar week following deposit of the same in any United States Post Office, registered or certified mail, postage prepaid, addressed as follows:
CONTRACTOR: United Rentals (North America), Inc.
Jordan Stevenson
4600 Salida Blvd
Salida, CA 95368
Phone (209) 876-4255
Email: [email protected]
CITY: City of Modesto
Purchasing Division
P.O. Box 642
Modesto, CA 95353
Kim Presson; (209) 577-5375
Email: [email protected]
Each party may change its address for delivery of notice by delivering written notice of such change of address to the other party.
19. SIGNATORY(IES) FOR CONTRACTOR:
Each signatory for CONTRACTOR below warrants and represents that it is legally competent to, and have full authority to, execute the AGREEMENT.
20. QUANTITIES: No minimum or maximum is guaranteed or implied.
21. FUNDING: All annual extensions are based upon continuous funding for that purpose by the City Council. Failure to fund any annual extension shall result in an immediate termination of the AGREEMENT without redress.
#4..
- 270 -
11 22. OTHER GOVERNMENT/PUBLICLY FUNDED AGENCIES: If mutually agreeable to all parties, the issuance of any resultant contract/purchase order referencing these specifications and modified by mutual agreement between all parties may be extended to other government or publicly funded agencies. It shall be understood that all terms and conditions as specified herein shall apply.
23. NON-DISCRIMINATION:
a. During the performance of this AGREEMENT, CONTRACTOR and any allowed subcontractors shall not unlawfully discriminate against any employee or applicant for employment because of race, color, ancestry, religion, sex, national origin, marital status, age, medical condition (cancer related), physical handicap (including AIDS), sexual orientation, or any other basis prohibited by Federal or California law. Equal employment opportunity extends, but is not limited to recruitment, compensation, benefits, layoff, termination, and all other conditions of employment. The CONTRACTOR and any allowed subcontractors shall ensure that the evaluation and treatment of their employees and applicants for employment are free of such discrimination.
The CONTRACTOR and any allowed subcontractors shall comply with the provisions of the Fair Employment and Housing Act (Government Code, Section 12900 et seq.) and the applicable regulations promulgated thereunder (California Administrative Code, Title 2, and Section 7285.0 et seq.). The applicable regulations of the Fair Employment and Housing Commission implementing Government Code, Section 12900, set forth in Chapter 5 of Division 4 of Title 2 of the California Administrative Code are incorporated into this contract by reference and made a part hereof as if set forth in full. b. The CONTRACTOR and any allowed subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement.
c. The CONTRACTOR shall include the nondiscrimination and compliance provisions of this clause in any allowed subcontracts to perform SERVICES. d. The Contractor shall permit access by representatives of the Department of Fair Employment and Housing and the CITY upon reasonable notice at any time during the normal business hours, but in no case less #4..
- 271 -
12 than 24 hours notice, to such of its books, records, accounts, other sources of information and its facilities as said Department or CITY shall require to ascertain compliance with this AGREEMENT. e. By executing this AGREEMENT, CONTRACTOR certifies that it shall follow and be in compliance with the Americans with Disabilities Act of 1990, the applicable administrative requirements promulgated in response thereto, and any other applicable Federal laws and regulations relating to handicap discrimination and participation, and will continue to do so for at least the duration of the AGREEMENT and any extensions thereof.
24. CONTRACTOR LICENSES & PERMITS: CONTRACTOR warrants and represents that it possesses and shall maintain all licenses, and shall secure and maintain all necessary permits, necessary to perform the SERVICES.
25. RECORDS: All final versions of reports, data, maps, models, charts, studies, surveys, photographs, memoranda, plans, studies, specifications, records, files, or any other documents or materials, in electronic or any other form, that CONTRACTOR prepares or obtains pursuant to this Agreement and that relate to the matters covered hereunder shall be the property of the CITY. CONTRACTOR hereby agrees to deliver those documents to the CITY upon termination of the AGREEMENT, and the CITY may use, reuse or otherwise dispose of the documents without CONTRACTOR’s permission. It is understood and agreed that the documents and other materials, including but not limited to those described above, prepared pursuant to this AGREEMENT are prepared specifically for the City and are not necessarily suitable for any future or other use.
26. FACILITIES AND EQUIPMENT: Except as set forth herein, CONTRACTOR shall, at its sole cost and expense, provide all facilities and equipment that may be necessary to perform the services required by this AGREEMENT. CITY shall make available to CONTRACTOR only the facilities and equipment listed in EXHIBIT “B” and “C”, and only under the terms and conditions set forth herein.
27. INDEPENDENT CONTRACTOR; NOT AGENT: At all times during the term of this AGREEMENT, CONTRACTOR shall be an independent contractor and shall not be an employee of CITY. CITY shall have the right to control CONTRACTOR only insofar as the results of CONTRACTOR’s services rendered pursuant to this AGREEMENT. Except as City may specify in writing, CONTRACTOR shall have no authority, express or #4..
- 272 -
13 implied, to act on behalf of CITY in any capacity whatsoever as an agent. CONTRACTOR shall have no authority, express or implied, pursuant to this AGREEMENT to bind City to any obligation whatsoever.
28. DRUG FREE WORKPLACE: CONTRACTOR certifies that it is following and in compliance with Sections 8350 - 8355 of Chapter 5.5 of the Government Code, Drug Free Workplace Act whereby each person or organization awarded a contract/purchase order or grant for the procurement of any property or service from any state agency (city) shall certify to the contracting or granting agency that it will provide a drug free workplace.
29. ASSIGNMENT:
Neither this AGREEMENT nor any SERVICES hereunder shall be subcontracted or assigned by CONTRACTOR without the prior written consent of the CITY in each and every instance.
30. WAIVER:
The waiver by any party to this AGREEMENT of a breach of any provision hereof shall be in writing and shall not operate or be construed as a waiver of any other or subsequent breach hereof unless specifically stated in writing.
31. HEADINGS NOT CONTROLLING:
Headings used in the Agreement are for reference purposes only and shall not be considered in construing this AGREEMENT.
32. MISCELLANEOUS:
Time is of the essence in CONTRACTOR’s performance under each provision of this AGREEMENT.
33. ENTIRE AGREEMENT:
This Agreement and its exhibits contain the entire understanding between CONTRACTOR and CITY. Additional or new terms contained in this AGREEMENT which vary from CONTRACTOR’S bid are controlling and are deemed accepted by CONTRACTOR by performance of any SERVICES or other commencement of performance hereunder. The terms and conditions of the IFB, attached hereto as Exhibit C, are incorporated herein. In the event of a conflict between the IFB and this AGREEMENT, this #4..
- 273 -
14 AGREEMENT shall control. All previous bids, offers and communications relative to this Agreement, whether oral or written, are hereby superseded except to the extent that they have been incorporated into this Agreement. No future waiver or exception to any of the terms, conditions, and provisions of this AGREEMENT shall be considered valid unless specifically agreed to in writing by the parties.
34. PARTIAL INVALIDITY:
If any provision in this AGREEMENT is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions shall nevertheless continue in full force without being impaired or invalidated in any way.
IN WITNESS WHEREOF, the CITY OF MODESTO, a municipal corporation, has authorized the execution of this Agreement in duplicate by its City Manager and attested by its City Clerk under authority of Resolution No. 2023-_______, adopted by the Council of the City of Modesto on the _____________ day of _____________________, 2023 and _____________________has caused this Agreement to be duly executed.
#4..
- 274 -
CITY OF MODESTO,
a municipal corporation
BY: ____________________________
JOSEPH P. LOPEZ, City Manager
ATTEST:
(Seal)
BY: ____________________________
DIANE NAYARES-PEREZ, CMC,
City Clerk
________________________________ BY: ____________________________ By _____________________________
Name Title
BY: ____________________________
By _____________________________
Name Title
APPROVED AS TO FORM:
BY: ____________________________
JOSE M. SANCHEZ, City Attorney
APPROVED AS TO FORM:
BY: ____________________________
CHRISTINA ALGER, Director of
Human Resources
Federal ID # ___________
#4..
- 275 -
2022-2023
Cat Class Description Day Week Month
63 2010 DELIVERY TRAILER - UP TO 9,999 LBS $ 98.00 $ 239.00 $ 589.00 63 3010 DELIVERY TRAILERS - 20,000 TO 39,999 LBS $ 144.00 $ 268.00 $ 707.00 75 2065 WINTERIZATION/SALT BRINE $ 11.00 $ 11.00 $ 11.00 75 2070 SERVICE - PORTABLE RESTROOM / SINK (ADDITIONAL SERVICE) $ 135.00 $ 135.00 $ 135.00 75 2075 FRESH WATER SYSTEM SERVICE (EXTRA 1X WEEK SERVICE) $ 282.00 $ 282.00 $ 511.00 75 2080 WASTE HOLDING TANK SERVICE (EXTRA 1X WEEK SERVICE) $ 203.00 $ 203.00 $ 403.00 75 2085 WASTE/WATER SERVICE - RESTROOM TRAILER / SHOWER TRAILER $ 565.00 $ 565.00 $ 2,258.00 100 3185 COMPRESSOR 175-195 CFM $ 120.00 $ 301.00 $ 722.00 100 3186 COMPRESSOR 175-195 CFM TIER 4 $ 207.00 $ 525.00 $ 942.00 100 3200 COMPRESSOR 200-245 CFM DIESEL $ 163.00 $ 415.00 $ 1,009.00 100 3250 COMPRESSOR 250-345 CFM $ 198.00 $ 499.00 $ 1,249.00 100 3275 COMPRESSOR 350-450 CFM HIGH PRESSURE $ 281.00 $ 719.00 $ 1,724.00 100 3276 COMPRESSOR 350-450 CFM 150 PSI T4 $ 349.00 $ 1,061.00 $ 1,811.00 100 3350 COMPRESSOR 350-395 CFM DIESEL $ 261.00 $ 629.00 $ 1,605.00 100 3380 COMPRESSOR 400-445 CFM DIESEL $ 273.00 $ 684.00 $ 1,724.00 100 3386 COMPRESSOR 350-450 CFM TIER 4 200 PSI $ 473.00 $ 1,243.00 $ 2,499.00 100 3750 COMPRESSOR 750-795 CFM DIESEL $ 484.00 $ 1,219.00 $ 3,018.00 100 3751 COMPRESSOR 750-795 CFM DIESEL TIER 4 $ 571.00 $ 1,464.00 $ 3,621.00 100 3760 COMPRESSOR 750-795 CFM HIGH PRESSURE $ 489.00 $ 1,207.00 $ 2,960.00 100 3761 COMPRESSOR 750-795 CFM 150 PSI T4 $ 543.00 $ 1,472.00 $ 3,849.00 100 3800 COMPRESSOR 800-845 CFM DIESEL $ 512.00 $ 1,277.00 $ 3,192.00 100 3801 COMPRESSOR 800-845 CFM DIESEL TIER 4 $ 571.00 $ 1,464.00 $ 3,552.00 100 3900 COMPRESSOR 850-1000 CFM 350 PSI $ 872.00 $ 2,167.00 $ 5,412.00 100 3901 COMPRESSOR 850-1000 CFM 350 PSI TIER 4 $ 1,076.00 $ 2,676.00 $ 7,005.00 100 3910 COMPRESSOR 850-900 CFM GAS/DIESEL $ 578.00 $ 1,444.00 $ 3,611.00 100 3911 COMPRESSOR 850-900 CFM GAS/DIESEL TIER 4 $ 695.00 $ 1,767.00 $ 4,417.00 100 4301 COMPRESSOR 1300-1500 CFM DIESEL TIER 4 $ 796.00 $ 2,042.00 $ 5,093.00 100 4315 COMPRESSOR 1300-1600 CFM OIL FREE W/COMP $ 2,890.00 $ 8,241.00 $ 24,085.00 100 4396 COMPRESSOR 1600-1800 CFM TIER 3 $ 824.00 $ 2,773.00 $ 6,226.00 100 4397 COMPRESSOR 1600-1800 CFM TIER 4 $ 1,061.00 $ 2,863.00 $ 6,436.00 100 4400 COMPRESSOR 1600-1800 CFM IQ $ 885.00 $ 2,205.00 $ 5,510.00 100 4401 COMPRESSOR 1600-1800 CFM IQ TIER 4 $ 1,055.00 $ 3,018.00 $ 7,625.00 100 5630 COMPRESSOR 151-200HP ROTARY SCREW $ 636.00 $ 1,388.00 $ 3,826.00 110 13 RIVET BUSTER AIR JUMBO $ 78.00 $ 193.00 $ 455.00 110 125 DUCT RODDER $ 79.00 $ 176.00 $ 399.00
110 1023 BORING TOOL AIR 3"-3.9" $ 245.00 $ 797.00 $ 1,884.00 110 1024 BORING TOOL AIR 4"-4.9" $ 297.00 $ 941.00 $ 1,988.00 110 1100 CHIPPING GUN AIR 15# $ 52.00 $ 121.00 $ 291.00 110 1170 CONCRETE SCABBLER AIR 5 HEAD $ 348.00 $ 787.00 $ 1,875.00 110 1340 AIR FLUX SCALER $ 19.00 $ 42.00 $ 100.00
110 1360 IMPACT WRENCH AIR 1/2" $ 38.00 $ 84.00 $ 200.00 110 1550 BREAKER PAVEMENT AIR 30# $ 52.00 $ 135.00 $ 344.00 110 1570 BREAKER PAVEMENT AIR 60# $ 59.00 $ 157.00 $ 367.00 110 1580 BREAKER PAVEMENT AIR 90# $ 67.00 $ 170.00 $ 414.00 110 1600 POST DRIVER AIR $ 75.00 $ 170.00 $ 406.00
110 1670 ROCK DRILL AIR 30-39 LB $ 103.00 $ 234.00 $ 555.00 110 1680 ROCK DRILL AIR 50-59 LB $ 112.00 $ 273.00 $ 649.00 110 1690 ROCK DRILL AIR 60-69 LB $ 127.00 $ 265.00 $ 630.00 110 1715 ROCK SPLITTER AIR 12# $ 393.00 $ 996.00 $ 2,432.00 110 1720 PUMP HYDRAULIC AIR ROCK SPLITTER $ 182.00 $ 466.00 $ 1,160.00 110 1830 TAMPER BACKFILL AIR $ 48.00 $ 107.00 $ 260.00
110 2400 AIR HOSE 3/4" X 50' $ 14.00 $ 25.00 $ 54.00
110 2600 AIR HOSE 2" X 50' $ 25.00 $ 81.00 $ 189.00
110 3363 MANIFOLD 4 WAY HOSE BRIDLE $ 23.00 $ 70.00 $ 171.00 110 3625 WHIP CHECK $ 5.00 $ 11.00 $ 26.00
110 3726 BULL HOSE 2" X 25' $ 17.00 $ 59.00 $ 176.00
110 3727 BULL HOSE 2" X 50' $ 25.00 $ 66.00 $ 182.00
110 4030 ASPHALT CUTTER 1 1/8" X 6" $ 11.00 $ 54.00 $ 100.00 110 4135 CHISEL 1" X 4 1/4" $ 6.00 $ 16.00 $ 31.00
110 4140 CHISEL 1" X 4 1/4" X 3" $ 7.00 $ 17.00 $ 31.00 EXHIBIT B
#4..
- 276 -
110 4150 CHISEL 1 1/4" X 6" $ 6.00 $ 16.00 $ 36.00
110 4165 CHISEL 1 1/8" X 6" $ 6.00 $ 14.00 $ 25.00
110 4167 CHISEL 1 1/8" X 6" X 3" $ 6.00 $ 13.00 $ 37.00 110 4210 CLAY SPADE 1 1/8" X 6" $ 14.00 $ 35.00 $ 86.00 110 4330 MOIL POINT 1" X 4 1/4" $ 6.00 $ 19.00 $ 33.00
110 4390 MOIL POINT 1 1/4" X 6" $ 6.00 $ 15.00 $ 26.00
110 4435 MOIL POINT 1 1/8" X 6" $ 6.00 $ 16.00 $ 28.00
110 4722 MOIL POINT 12" OVAL COLLARED $ 9.00 $ 18.00 $ 34.00 110 6030 DRILL SLAB RIDER PNEUMATIC DOWEL 1 GANG $ 266.00 $ 733.00 $ 1,518.00 110 7035 AFTERCOOLER PACKAGE 1600 CFM $ 327.00 $ 915.00 $ 2,523.00 110 7170 AIR DRYER 251-500 CFM DESICANT $ 278.00 $ 836.00 $ 2,508.00 110 7177 1001 - 1600 CFM DRYER $ 558.00 $ 1,672.00 $ 5,015.00 150 2000 RAMMER SMALL 1200-2399 LBS/BLOW $ 87.00 $ 261.00 $ 551.00 150 2400 RAMMER MEDIUM 2400-2800 LBS/BLOW $ 103.00 $ 303.00 $ 650.00 150 2600 RAMMER LARGE 2900-3600 LBS/BLOW $ 105.00 $ 310.00 $ 662.00 150 2610 RAMMER LARGE DIESEL $ 131.00 $ 322.00 $ 825.00 150 3100 VIB PLATE MEDIUM 3000-5000# IMPACT $ 102.00 $ 272.00 $ 643.00 150 3400 VIB PLATE REVERSIBLE 5000-5999# IMPACT $ 125.00 $ 338.00 $ 798.00 150 3500 VIB PLATE REVERSIBLE 6000-6999# IMPACT $ 144.00 $ 455.00 $ 990.00 150 3600 VIB PLATE REVERSIBLE 7000-8599# IMPACT $ 178.00 $ 544.00 $ 1,120.00 150 3700 VIB PLATE REVERSIBLE 8600-10999# IMPACT $ 218.00 $ 612.00 $ 1,241.00 150 3810 VIB PLATE REVERSIBLE 11000-13999# IMPACT $ 241.00 $ 712.00 $ 1,388.00 150 3820 VIB PLATE REVERSIBLE 14000-15999# IMPACT $ 310.00 $ 939.00 $ 1,867.00 160 1245 ROLLER 18-29" WALKBEHIND DBL DRUM SMOOTH $ 252.00 $ 774.00 $ 1,853.00 160 1265 ROLLER 24-33" WALKBEHIND PAD $ 309.00 $ 886.00 $ 2,063.00 160 2405 ROLLER 40-49" VIB SINGLE DRUM SMOOTH $ 425.00 $ 1,073.00 $ 2,630.00 160 2410 ROLLER 41-49" VIB SINGLE DRUM PAD $ 403.00 $ 1,064.00 $ 2,511.00 160 2420 ROLLER 50-56" VIB SINGLE DRUM PAD $ 507.00 $ 1,256.00 $ 3,135.00 160 2425 ROLLER 50-56" VIB SINGLE DRUM SMOOTH $ 522.00 $ 1,292.00 $ 3,166.00 160 2440 ROLLER 61-70" VIB SINGLE DRUM PAD $ 558.00 $ 1,503.00 $ 3,751.00 160 2445 ROLLER 61-70" VIB SINGLE DRUM SMOOTH $ 548.00 $ 1,487.00 $ 3,580.00 160 2450 ROLLER 80-89" VIB SINGLE DRUM PAD $ 816.00 $ 1,997.00 $ 4,984.00 160 2455 ROLLER 80-89" VIB SINGLE DRUM SMOOTH $ 778.00 $ 1,886.00 $ 4,798.00 160 2515 ROLLER 50-59" VIB ART DOUBLE DRUM SMOOTH $ 316.00 $ 1,262.00 $ 3,787.00 160 2520 ROLLER 60-69" VIB ART DOUBLE DRUM SMOOTH $ 586.00 $ 2,072.00 $ 6,217.00 160 2525 ROLLER 70-79" VIB ART DOUBLE DRUM SMOOTH $ 1,204.00 $ 3,725.00 $ 8,494.00 160 2620 ROLLER 1.5 TON DOUBLE DRUM SMOOTH DSL $ 365.00 $ 981.00 $ 2,391.00 160 2621 ROLLER 1.5 TON DOUBLE DRUM SMOOTH GAS $ 286.00 $ 868.00 $ 1,883.00 160 2660 ROLLER 3-5 TON DOUBLE DRUM SMOOTH $ 349.00 $ 891.00 $ 2,178.00 160 2670 ROLLER 4-7 TON DOUBLE DRUM SMOOTH $ 352.00 $ 931.00 $ 1,948.00 160 6474 ROLLER ATTACHMENT 84" PAD SHELL $ 31.00 $ 97.00 $ 208.00 170 3220 CRANE 2.5 TON INDUSTRIAL $ 365.00 $ 1,070.00 $ 2,664.00 170 3235 CRANE 4 TON INDUSTRIAL $ 502.00 $ 1,258.00 $ 3,102.00 170 3280 CRANE 8.5-9 TON INDUSTRIAL $ 591.00 $ 1,501.00 $ 3,745.00 170 4170 CRANE 17 TON TRUCK MOUNTED $ 784.00 $ 2,119.00 $ 5,286.00 170 4175 CRANE 18 TON TRUCK MOUNTED $ 809.00 $ 2,196.00 $ 5,802.00 170 4235 CRANE 23.5 TON TRUCK MOUNTED $ 1,030.00 $ 2,563.00 $ 6,905.00 170 4400 CRANE 15 TON INDUSTRIAL $ 831.00 $ 2,248.00 $ 5,253.00 170 4410 CRANE 18 TON INDUSTRIAL $ 1,291.00 $ 3,469.00 $ 7,061.00 170 6015 CRANE 15 TON ROUGH TERRAIN $ 707.00 $ 2,048.00 $ 5,671.00 170 6060 CRANE 60 TON ROUGH TERRAIN $ 1,575.00 $ 4,715.00 $ 13,998.00 170 6070 CRANE 75 TON ROUGH TERRAIN $ 1,666.00 $ 4,725.00 $ 14,154.00 170 7190 CRANE 19 TON TRUCK MOUNTED $ 689.00 $ 2,092.00 $ 4,811.00 170 9009 CRANE HOOK ATTACHMENT FOR FORKLIFT $ 61.00 $ 159.00 $ 335.00 180 2190 MIXER MORTAR 3-3.9 CUBIC FEET ELECTRIC $ 56.00 $ 156.00 $ 341.00 180 2207 MIXER MORTAR 7 CUBIC FEET $ 126.00 $ 298.00 $ 725.00 180 2219 MIXER MORTAR 9 CUBIC FEET $ 133.00 $ 335.00 $ 810.00 180 2765 MIXER CONCRETE 2-3 CUBIC FEET ELECTRIC $ 62.00 $ 226.00 $ 462.00 180 2800 MIXER CONCRETE 6 CUBIC FEET $ 96.00 $ 294.00 $ 709.00 180 2860 MIXER CONCRETE 9 CUBIC FEET $ 125.00 $ 317.00 $ 765.00 180 5015 BUGGY 15-19 CUBIC FEET POWERED PROPANE $ 167.00 $ 531.00 $ 1,027.00 180 5016 BUGGY 15-19 CUBIC FEET POWERED WHEEL $ 133.00 $ 327.00 $ 833.00 #4..
- 277 -
180 5017 BUGGY 15-19 CUBIC FEET POWERED TRACK $ 200.00 $ 656.00 $ 1,187.00 180 5019 BUGGY 20-30 CUBIC FEET POWERED WHEEL $ 183.00 $ 482.00 $ 1,022.00 180 5580 BUCKET CONCRETE 1 YARD $ 97.00 $ 240.00 $ 589.00 180 7000 CORE DRILL ELECTRIC 13-15 AMP $ 123.00 $ 345.00 $ 792.00 180 7001 CORE DRILL ELECTRIC 17-23 AMP $ 112.00 $ 365.00 $ 717.00 180 7006 DRILL CORE RIG ELECTRIC 10" WITH VACUUM $ 87.00 $ 222.00 $ 565.00 180 7801 VIBRATOR CONCRETE MOTOR ELECTRIC $ 38.00 $ 123.00 $ 299.00 180 7882 VIBRATOR BACKPACK GAS POWERED $ 91.00 $ 297.00 $ 588.00 180 9536 FINISHER CONCRETE 36" $ 83.00 $ 258.00 $ 575.00 180 9548 FINISHER CONCRETE 46"-48" $ 104.00 $ 259.00 $ 654.00 181 1006 BULL FLOAT MAGNESIUM BULK $ 24.00 $ 74.00 $ 164.00 181 1011 BULL FLOAT EXTENSION HANDLE 6' $ 3.00 $ 12.00 $ 32.00 181 1070 CONCRETE HAND TOOL $ 52.00 $ 103.00 $ 194.00
181 7145 DIAMOND CORE BIT 1 1/2" $ 21.00 $ 58.00 $ 96.00 181 7200 DIAMOND CORE BIT 2" $ 28.00 $ 70.00 $ 138.00
181 7201 DIAMOND CORE BIT 3" $ 39.00 $ 88.00 $ 192.00
181 7210 DIAMOND CORE BIT 2 1/2" $ 43.00 $ 90.00 $ 219.00 181 7236 DIAMOND CORE BIT 3 1/2" $ 43.00 $ 89.00 $ 136.00 181 7241 DIAMOND CORE BIT 4" $ 53.00 $ 94.00 $ 199.00
181 7245 DIAMOND CORE BIT 4 1/2" $ 53.00 $ 118.00 $ 126.00 181 7251 DIAMOND CORE BIT 5" $ 66.00 $ 94.00 $ 154.00
181 7261 DIAMOND CORE BIT 6" $ 76.00 $ 136.00 $ 277.00
181 7280 DIAMOND CORE BIT 8" $ 110.00 $ 188.00 $ 352.00 181 7301 DIAMOND CORE BIT 10" $ 143.00 $ 197.00 $ 418.00 181 7306 DIAMOND CORE BIT 12" $ 162.00 $ 201.00 $ 494.00 181 7310 CORE DRILL EXTENSION 12" $ 13.00 $ 17.00 $ 32.00 181 7320 CORE DRILL HAND HELD $ 102.00 $ 299.00 $ 697.00 181 7330 CORE DRILL STAND $ 12.00 $ 36.00 $ 70.00
181 7345 WATER TANK FOR CORE DRILL $ 16.00 $ 35.00 $ 83.00 181 7905 VIBRATOR FLEX SHAFT 10' $ 35.00 $ 77.00 $ 182.00 181 7918 VIBRATOR SHAFT 13' WHIP $ 39.00 $ 118.00 $ 236.00 181 7927 VIBRATOR HEAD 1 3/4" $ 17.00 $ 38.00 $ 91.00
181 8550 BENDER REBAR 1" ELECTRIC $ 201.00 $ 494.00 $ 1,224.00 181 8611 REBAR CUTTER 1" ELECTRIC HYDRAULIC $ 92.00 $ 210.00 $ 502.00 181 8615 REBAR CUTTER BENDER 5/8" $ 32.00 $ 70.00 $ 169.00 190 1000 CAULKING GUN CORDLESS $ 14.00 $ 32.00 $ 72.00
190 1900 DEMO HAMMER TILE STRIPPING CART $ 62.00 $ 158.00 $ 203.00 190 2000 DEMO HAMMER 20-25# ELECTRIC $ 86.00 $ 211.00 $ 527.00 190 2030 DEMO HAMMER 30-34# ELECTRIC $ 93.00 $ 211.00 $ 568.00 190 2110 DEMO HAMMER 35-39# ELECTRIC $ 141.00 $ 313.00 $ 745.00 190 2200 DEMO HAMMER 60# ELECTRIC $ 126.00 $ 317.00 $ 770.00 190 2342 IMPACT WRENCH 1/2" CORDLESS $ 38.00 $ 85.00 $ 201.00 190 2344 IMPACT WRENCH 3/4" CORDLESS $ 48.00 $ 108.00 $ 257.00 190 3500 DRILL PRESS MAGNETIC 1/2" $ 87.00 $ 179.00 $ 426.00 190 3550 DRILL PRESS MAGNETIC 3/4" $ 104.00 $ 233.00 $ 555.00 190 3610 DRILL PRESS MAGNETIC 1 1/2" $ 117.00 $ 260.00 $ 619.00 190 5010 SHEAR WRENCH 5/8"-7/8" ELECTRIC $ 100.00 $ 221.00 $ 511.00 190 5015 SHEAR WRENCH 3/4"-1" ELECTRIC $ 149.00 $ 358.00 $ 804.00 190 5020 SHEAR WRENCH 3/4"-1 1/8" ELECTRIC $ 168.00 $ 395.00 $ 898.00 190 5750 RADIO 2 WAY SITE $ 37.00 $ 80.00 $ 178.00
190 5776 RADIO INTRINSIC DIGITAL UHF 8/90 $ 8.00 $ 40.00 $ 120.00 190 5780 RADIO HAND HELD EXPLOSION PROOF WITH MIC $ 30.00 $ 62.00 $ 149.00 190 5786 CHARGER GANG RADIO $ 19.00 $ 45.00 $ 105.00
190 6075 ROTARY HAMMER CORDLESS SDS $ 41.00 $ 93.00 $ 217.00 190 6225 ROTARY HAMMER SMALL SDS ELECTRIC $ 50.00 $ 109.00 $ 260.00 190 6300 ROTARY HAMMER MEDIUM SDS ELECTRIC $ 33.00 $ 102.00 $ 288.00 190 6375 ROTARY HAMMER LARGE SDS MAX ELECTRIC $ 92.00 $ 230.00 $ 573.00 190 6450 ROTARY HAMMER ELECTRIC FOR LG SPLINE $ 100.00 $ 249.00 $ 590.00 190 6525 ROTARY HAMMER XL SDS MAX ELECTRIC $ 111.00 $ 265.00 $ 638.00 190 7525 SANDER ORBITAL ELECTRIC $ 69.00 $ 190.00 $ 439.00 190 8810 VIBRATOR MOTOR 1HP ELECTRIC $ 61.00 $ 142.00 $ 339.00 190 8820 VIBRATOR MOTOR 2HP ELECTRIC $ 86.00 $ 211.00 $ 419.00 #4..
- 278 -
190 8830 VIBRATOR MOTOR 3HP ELECTRIC $ 85.00 $ 196.00 $ 498.00 200 6 PUNCH SET HYDRAULIC 25-35 TON $ 186.00 $ 414.00 $ 985.00 200 10 CABLE PULLER TUGGER 5000# ELECTRIC $ 265.00 $ 587.00 $ 1,370.00 200 12 CABLE PULLER TUGGER 6500# ELECTRIC $ 278.00 $ 618.00 $ 1,586.00 200 16 CABLE PULLER TUGGER 4000# ELECTRIC $ 153.00 $ 339.00 $ 802.00 200 18 CABLE PULLER TUGGER 2000# ELECTRIC $ 100.00 $ 207.00 $ 507.00 200 1050 PIPE BENDER HYDRAULIC 2 1/2"-4" $ 457.00 $ 1,005.00 $ 2,393.00 200 1055 PIPE BENDER HYD 1/2"-2" WITH HAND PUMP $ 83.00 $ 185.00 $ 436.00 200 1150 PIPE BENDER TABLE 881 $ 72.00 $ 169.00 $ 401.00 200 1200 PIPE BENDER ELECTRIC 1/2"-2" $ 209.00 $ 466.00 $ 1,109.00 200 5070 CABLE PULLER TUGGER FLOOR MOUNT $ 14.00 $ 30.00 $ 69.00 200 5100 CABLE PULLER TUGGER 10000# ELECTRIC $ 375.00 $ 795.00 $ 1,930.00 200 5107 TUGGER REEL STAND 22"-54" $ 38.00 $ 85.00 $ 204.00 200 6100 PIPE BENDER PVC HEATER 1/2"-4" $ 44.00 $ 98.00 $ 233.00 200 6200 PIPE BENDER PVC HEATER 1"-6" $ 59.00 $ 136.00 $ 317.00 200 7654 PUNCH KNOCKOUT SET CORDLESS $ 75.00 $ 169.00 $ 376.00 200 7870 PIPE BENDER ELECTRIC 1/2" TO 1-1/8" TUBE $ 131.00 $ 292.00 $ 696.00 210 4604 RAM HYDRAULIC 5 TON 1" STROKE $ 15.00 $ 33.00 $ 78.00 210 4607 RAM HYDRAULIC 5 TON 5" STROKE $ 16.00 $ 36.00 $ 81.00 210 4620 RAM HYDRAULIC 10 TON 1" STROKE $ 17.00 $ 40.00 $ 92.00 210 4630 RAM HYDRAULIC 10 TON 6.13" STROKE $ 20.00 $ 45.00 $ 107.00 210 4645 RAM HYDRAULIC 15 TON 2" STROKE $ 21.00 $ 48.00 $ 115.00 210 4650 RAM HYDRAULIC 15 TON 4" STROKE $ 24.00 $ 53.00 $ 128.00 210 4705 RAM HYDRAULIC 50 TON 0.63" STROKE $ 40.00 $ 92.00 $ 213.00 210 4715 RAM HYDRAULIC 55 TON 4.25" STROKE $ 52.00 $ 116.00 $ 276.00 210 4720 RAM HYDRAULIC 60 TON 3" STROKE HOLLOW $ 94.00 $ 210.00 $ 501.00 210 4740 RAM HYDRAULIC 100 TON 2" STROKE $ 94.00 $ 210.00 $ 492.00 210 5190 MAINTENANCE SET HYDRAULIC 10-25 TON $ 83.00 $ 191.00 $ 476.00 210 5315 RAM HYDRAULIC 150 TON 2" STROKE $ 133.00 $ 296.00 $ 660.00 210 5335 PUMP HYD HAND 10K PSI 100-300 CUBIC INCH $ 34.00 $ 77.00 $ 183.00 210 5345 PUMP HYD HAND 10K PSI DOUBLE ACTION $ 174.00 $ 386.00 $ 919.00 210 9854 SANDBLAST POT 150# $ 137.00 $ 374.00 $ 1,035.00 210 9858 SANDBLAST POT 200# $ 178.00 $ 407.00 $ 1,057.00 210 9859 SANDBLAST POT 300# $ 185.00 $ 462.00 $ 1,141.00 220 1800 CARPET EXTRACTOR RIDE ON $ 368.00 $ 1,062.00 $ 2,454.00 220 2000 CONCRETE GRINDER 2 HEAD 1 PHASE 1.5HP $ 187.00 $ 465.00 $ 1,159.00 220 2200 CONCRETE GRINDER 2 HEAD GAS $ 119.00 $ 362.00 $ 797.00 220 2320 CONCRETE GRINDER 3 HEAD 1 PHASE $ 431.00 $ 1,155.00 $ 3,465.00 220 2400 GRINDER STONES $ 25.00 $ 72.00 $ 150.00
220 2500 DYMA-SERT DIAMOND HEADS $ 89.00 $ 266.00 $ 604.00 220 2502 DYMA-DOTS GRINDER INSERT $ 91.00 $ 247.00 $ 623.00 220 3104 CONCRETE GRINDER 1 HEAD 1 PHASE 115 VOLT $ 132.00 $ 374.00 $ 739.00 220 3105 CONCRETE GRINDER 1 HEAD 1 PHASE 230 VOLT $ 217.00 $ 735.00 $ 1,183.00 220 5425 PLANER CONCRETE 8" 9HP GAS $ 262.00 $ 667.00 $ 1,711.00 220 5460 CPM 8 GENERAL PURPOSE SETUP $ 128.00 $ 321.00 $ 644.00 220 6060 RIDE ON FLOOR SCRAPER ELECTRIC 1150# $ 627.00 $ 1,963.00 $ 4,525.00 220 6100 TILE STRIPPER 100-199# 110 VOLT $ 77.00 $ 212.00 $ 530.00 220 6300 TILE STRIPPER 200-399# 110 VOLT $ 298.00 $ 1,009.00 $ 2,072.00 220 6900 SCALER NEEDLE AIR SMALL $ 16.00 $ 36.00 $ 84.00 220 7055 FLOOR POLISHER/STRIPPER 17" $ 73.00 $ 170.00 $ 416.00 220 7061 FLOOR SCRUBBER 24" WALKBEHIND $ 229.00 $ 688.00 $ 1,733.00 220 7062 FLOOR SCRUBBER 28" WALKBEHIND $ 292.00 $ 743.00 $ 1,804.00 220 7063 FLOOR SCRUBBER 20" WALKBEHIND $ 184.00 $ 475.00 $ 1,006.00 220 7065 SANDER FLOOR 12" X 18" ORBITAL $ 83.00 $ 277.00 $ 693.00 220 7066 FLOOR SCRUBBER 32" WALKBEHIND $ 235.00 $ 706.00 $ 1,496.00 220 7071 FLOOR SCRUBBER 14" WALKBEHIND $ 164.00 $ 435.00 $ 811.00 220 7850 SCRUBBER FLOOR RIDE ON $ 505.00 $ 1,230.00 $ 3,124.00 220 8000 HARDWOOD SANDER 8" DRUM W/DUST BAG $ 67.00 $ 309.00 $ 871.00 220 9030 VACUUM INDUSTRIAL PNEUMATIC 55 GALLON $ 114.00 $ 267.00 $ 625.00 220 9100 VACUUM WET/DRY 10-14 GALLON $ 37.00 $ 82.00 $ 195.00 220 9525 VACUUM ELEC CONCRETE DUST $ 39.00 $ 86.00 $ 205.00 220 9530 VACUUM ELEC CONCRETE DUST MULTI STAGE $ 104.00 $ 231.00 $ 551.00 #4..
- 279 -
220 9810 HEPA VACUUM $ 115.00 $ 314.00 $ 674.00
230 5110 FORKLIFT 4' PALLET FORKS $ 5.00 $ 13.00 $ 25.00 230 5130 FORKLIFT 6' FORKS $ 28.00 $ 86.00 $ 110.00
230 5135 FORKLIFT 8' FORKS $ 30.00 $ 58.00 $ 131.00
230 5151 FORK EXTENSIONS 6' $ 25.00 $ 67.00 $ 150.00
230 5170 FORK EXTENSIONS 8' $ 40.00 $ 101.00 $ 253.00
230 5212 FORKLIFT TOW AND LIFT ATTACHMENT $ 64.00 $ 167.00 $ 431.00 230 5250 FORKLIFT JIB $ 58.00 $ 144.00 $ 361.00
230 5265 TRUSS BOOM 1500# CAPACITY 10' LONG $ 72.00 $ 168.00 $ 370.00 230 5274 TRUSS BOOM 2000# CAPACITY 12' LONG $ 93.00 $ 243.00 $ 561.00 230 5310 FORKLIFT MATERIAL BUCKET $ 72.00 $ 246.00 $ 349.00 230 5325 FORKLIFT HOPPER 1.5 YARD $ 66.00 $ 173.00 $ 375.00 230 5330 FORKLIFT HOPPER 2 YARD $ 109.00 $ 224.00 $ 377.00 230 6132 FORKLIFT MAN CAGE 4' X 8' $ 60.00 $ 169.00 $ 414.00 231 1200 FORKLIFT WHSE 5000# GAS/LP $ 217.00 $ 615.00 $ 1,305.00 231 1201 FORKLIFT WHSE 5000# ELECTRIC $ 217.00 $ 615.00 $ 1,305.00 231 1202 FORKLIFT WHSE 5000# DIESEL $ 217.00 $ 615.00 $ 1,305.00 231 1204 FORKLIFT WHSE 5000# CUSHION $ 217.00 $ 615.00 $ 1,305.00 231 1205 FORKLIFT WHSE 5000# LOW PROFILE GAS/LP $ 217.00 $ 615.00 $ 1,305.00 231 1209 FORKLIFT WHSE 5000# PNEU DF QUADMAST $ 217.00 $ 615.00 $ 1,305.00 231 1220 FORKLIFT WHSE 6000# PNEU NMT DF QUADMAST $ 241.00 $ 755.00 $ 1,544.00 231 1250 FORKLIFT WHSE 6000# GAS/LP $ 241.00 $ 755.00 $ 1,544.00 231 1252 FORKLIFT WHSE 6000# DIESEL $ 241.00 $ 755.00 $ 1,544.00 231 1253 FORKLIFT WHSE 6000# PNEUMATIC $ 241.00 $ 755.00 $ 1,544.00 231 1254 FORKLIFT WHSE 6000# CUSHION $ 241.00 $ 755.00 $ 1,544.00 231 1350 FORKLIFT WHSE 8000# GAS/LP $ 296.00 $ 864.00 $ 1,815.00 231 1351 FORKLIFT WHSE 8000# DIESEL $ 296.00 $ 864.00 $ 1,815.00 231 1353 FORKLIFT WHSE 8000# PNEUMATIC $ 296.00 $ 864.00 $ 1,815.00 231 1445 FORKLIFT WHSE 10000-12500# DIESEL $ 351.00 $ 910.00 $ 2,252.00 231 1450 FORKLIFT WHSE 10000-12500# PNEUMATIC $ 422.00 $ 1,123.00 $ 2,659.00 231 1801 FORKLIFT WHSE 15000# $ 497.00 $ 1,418.00 $ 3,185.00 231 1850 FORKLIFT WHSE 20000-22499# PNEUMATIC $ 620.00 $ 1,851.00 $ 4,343.00 231 1950 FORKLIFT WHSE 25000-30000# PNEUMATIC $ 684.00 $ 2,184.00 $ 5,459.00 231 1975 FORKLIFT WHSE 30000-35000# PNEUMATIC $ 940.00 $ 2,465.00 $ 6,050.00 231 2000 FORKLIFT WHSE 35000-49999# PNEUMATIC $ 1,042.00 $ 2,663.00 $ 6,516.00 231 2210 FORKLIFT WHSE 10000-12000# CONST PNEU $ 373.00 $ 923.00 $ 2,464.00 231 500 FORKLIFT WHSE 1000-4000# ELEC WALKBEHIND $ 181.00 $ 560.00 $ 1,127.00 232 2210 FORKLIFT ROUGH TERRAIN 6000# 11-20' 2WD $ 328.00 $ 819.00 $ 2,045.00 232 2215 FORKLIFT ROUGH TERRAIN 6000# 21-29' $ 361.00 $ 904.00 $ 2,260.00 232 2305 FORKLIFT ROUGH TERRAIN 8000# 15-22' 2WD $ 373.00 $ 932.00 $ 2,328.00 232 2306 FORKLIFT ROUGH TERRAIN 8000# 15-22' 4WD $ 399.00 $ 962.00 $ 2,373.00 233 1000 FORKLIFT 4500# 15' & UP VARIABLE REACH $ 335.00 $ 982.00 $ 2,193.00 233 1025 FORKLIFT 5000# 16-20' VARIABLE REACH $ 344.00 $ 1,060.00 $ 2,258.00 233 1155 FORKLIFT VARIABLE REACH 6000# 15 $ 416.00 $ 1,162.00 $ 2,367.00 233 1160 FORKLIFT VARIABLE REACH 6000# 35-39' $ 433.00 $ 1,221.00 $ 2,626.00 233 1170 FORKLIFT VARIABLE REACH 6000# 40-49' $ 433.00 $ 1,221.00 $ 2,578.00 233 1250 FORKLIFT VARIABLE REACH 7000# 38 $ 474.00 $ 1,246.00 $ 2,523.00 233 1325 FORKLIFT VARIABLE REACH 8000# 50' & UP $ 547.00 $ 1,498.00 $ 3,718.00 233 1370 FORKLIFT VARIABLE REACH 8000# 40-49' $ 497.00 $ 1,389.00 $ 2,992.00 233 1470 FORKLIFT VARIABLE REACH 9000# 30-45' $ 622.00 $ 1,577.00 $ 3,762.00 233 1600 FORKLIFT VARIABLE REACH 10000# 40-49' $ 655.00 $ 1,636.00 $ 4,128.00 233 1650 FORKLIFT VARIABLE REACH 10000# 50' & UP $ 667.00 $ 1,683.00 $ 4,169.00 233 1675 FORKLIFT VARIABLE REACH 12000# 55' & UP $ 745.00 $ 2,053.00 $ 4,965.00 233 1685 FORKLIFT VARIABLE REACH 14000# 55' & UP $ 836.00 $ 2,362.00 $ 5,575.00 233 1690 FORKLIFT VARIABLE REACH 15-16000# 40-55' $ 1,041.00 $ 2,805.00 $ 6,940.00 233 1695 FORKLIFT VARIABLE REACH 16-18000# 32'&UP $ 1,357.00 $ 3,530.00 $ 9,080.00 233 1700 FORKLIFT VARIABLE REACH 20000# 32' & UP $ 1,671.00 $ 5,098.00 $ 13,258.00 233 2140 TELESCOPIC HANDLER 13200# 96'ROTATINGBOO $ 4,439.00 $ 8,918.00 $ 15,554.00 240 2981 GENERATOR 2.0-2.4 KW $ 57.00 $ 182.00 $ 457.00 240 2991 GENERATOR 2.5-2.9 KW $ 62.00 $ 194.00 $ 466.00 240 3001 GENERATOR 3.0-3.4 KW $ 64.00 $ 202.00 $ 498.00 240 3006 GENERATOR 3.5-3.9 KW $ 76.00 $ 239.00 $ 566.00 #4..
- 280 -
240 3021 GENERATOR 4.0-4.4 KW $ 80.00 $ 260.00 $ 578.00 240 3041 GENERATOR 5.0-5.4 KW $ 95.00 $ 312.00 $ 648.00 240 3051 GENERATOR 5.5-5.9 KW $ 97.00 $ 317.00 $ 661.00 240 3056 GENERATOR 6.0-6.4 KW $ 98.00 $ 319.00 $ 667.00 240 3061 GENERATOR 6.5-6.9 KW $ 99.00 $ 321.00 $ 672.00 240 3066 GENERATOR 7.0-7.4 KW $ 108.00 $ 348.00 $ 695.00 240 3091 GENERATOR 9.6-9.9 KW $ 126.00 $ 384.00 $ 712.00 240 3101 GENERATOR 10.0-11.9 KW $ 142.00 $ 399.00 $ 741.00 240 3111 GENERATOR 12.0-14.9 KW $ 182.00 $ 456.00 $ 912.00 240 3126 GENERATOR 15.0-17.9 KW $ 239.00 $ 604.00 $ 1,253.00 240 3127 GENERATOR 15.0-17.9 KW TIER 4 $ 276.00 $ 734.00 $ 1,481.00 240 3131 GENERATOR 19-29 KVA $ 253.00 $ 505.00 $ 1,505.00 240 3132 GENERATOR 19-29 KVA TIER 4 $ 253.00 $ 505.00 $ 1,505.00 240 3135 GENERATOR 19-29 KVA 600 VOLT $ 253.00 $ 505.00 $ 1,505.00 240 3136 GENERATOR 30-39 KVA $ 247.00 $ 636.00 $ 1,509.00 240 3137 GENERATOR 30-39 KVA TIER 4 $ 283.00 $ 763.00 $ 1,775.00 240 3146 GENERATOR 40-44 KVA $ 290.00 $ 580.00 $ 1,720.00 240 3147 GENERATOR 40-44 KVA TIER 4 $ 308.00 $ 809.00 $ 1,823.00 240 3156 GENERATOR 45-49 KVA $ 256.00 $ 716.00 $ 1,685.00 240 3157 GENERATOR 45-49 KVA TIER 4 $ 342.00 $ 683.00 $ 2,042.00 240 3166 GENERATOR 50-59 KVA $ 342.00 $ 683.00 $ 2,042.00 240 3167 GENERATOR 50-59 KVA TIER 4 $ 344.00 $ 977.00 $ 2,260.00 240 3168 GENERATOR 50-59 KVA OFF SHORE $ 361.00 $ 1,446.00 $ 4,338.00 240 3186 GENERATOR 70-84 KVA $ 346.00 $ 826.00 $ 2,057.00 240 3187 GENERATOR 70-84 KVA TIER 4 $ 385.00 $ 1,060.00 $ 2,445.00 240 3189 GENERATOR 70-84 KVA OFF SHORE $ 332.00 $ 1,328.00 $ 5,312.00 240 3190 GENERATOR 70-84 KVA 600 VOLT $ 346.00 $ 826.00 $ 2,057.00 240 3196 GENERATOR 85-89 KVA $ 356.00 $ 907.00 $ 2,475.00 240 3198 GENERATOR 90-99 KVA $ 327.00 $ 775.00 $ 2,159.00 240 3211 GENERATOR 100-109 KVA $ 424.00 $ 945.00 $ 2,461.00 240 3212 GENERATOR 100-109 KVA TIER 4 $ 465.00 $ 1,130.00 $ 3,777.00 240 3225 GENERATOR 110-124 KVA $ 430.00 $ 860.00 $ 2,580.00 240 3226 GENERATOR 110-124 KVA TIER 4 $ 430.00 $ 860.00 $ 2,580.00 240 3231 GENERATOR 125-149 KVA $ 484.00 $ 967.00 $ 2,902.00 240 3232 GENERATOR 125-149 KVA TIER 4 $ 549.00 $ 1,101.00 $ 3,301.00 240 3234 GENERATOR 125-149 KVA OFF SHORE $ 1,166.00 $ 2,333.00 $ 6,987.00 240 3235 GENERATOR 125-149 KVA 600 VOLT $ 232.00 $ 1,550.00 $ 6,434.00 240 3251 GENERATOR 150-179 KVA $ 537.00 $ 1,075.00 $ 3,225.00 240 3252 GENERATOR 150-179 KVA TIER 4 $ 662.00 $ 1,323.00 $ 3,969.00 240 3256 GENERATOR 180-199 KVA $ 699.00 $ 1,182.00 $ 3,547.00 240 3257 GENERATOR 180-199 KVA TIER 4 $ 718.00 $ 1,407.00 $ 4,185.00 240 3258 GENERATOR 180-199 KVA 600 VOLT $ 768.00 $ 1,727.00 $ 5,378.00 240 3261 GENERATOR 200-219 KVA $ 691.00 $ 1,616.00 $ 4,147.00 240 3286 GENERATOR 220-249 KVA $ 648.00 $ 1,264.00 $ 4,012.00 240 3288 GENERATOR 220-249 KVA TIER 4 $ 721.00 $ 1,448.00 $ 4,597.00 240 3290 GENERATOR 220-249 KVA OFF SHORE $ 562.00 $ 2,247.00 $ 8,990.00 240 3301 GENERATOR 250-299 KVA $ 880.00 $ 1,832.00 $ 4,733.00 240 3302 GENERATOR 250-299 KVA 600 VOLT $ 1,021.00 $ 2,444.00 $ 8,249.00 240 3303 GENERATOR 250-299 KVA TIER 4 $ 1,005.00 $ 2,010.00 $ 6,020.00 240 3311 GENERATOR 300-349 KVA $ 790.00 $ 1,636.00 $ 4,877.00 240 3312 GENERATOR 300-349 KVA 600 VOLT $ 1,105.00 $ 2,297.00 $ 7,146.00 240 3313 GENERATOR 300-349 KVA TIER 4 $ 1,075.00 $ 2,150.00 $ 6,450.00 240 3321 GENERATOR 350-399 KVA $ 824.00 $ 1,808.00 $ 5,370.00 240 3322 GENERATOR 350-399 KVA 600 VOLT $ 1,420.00 $ 2,780.00 $ 8,652.00 240 3325 GENERATOR 350-399 KVA OFF SHORE $ 930.00 $ 3,719.00 $ 14,875.00 240 3351 GENERATOR 400-499 KVA $ 965.00 $ 1,805.00 $ 5,679.00 240 3352 GENERATOR 400-499 KVA 600 VOLT $ 1,456.00 $ 2,854.00 $ 8,882.00 240 3354 GENERATOR 400-499 KVA TIER 4 $ 1,290.00 $ 2,580.00 $ 7,740.00 240 3401 GENERATOR 500-599 KVA $ 1,199.00 $ 2,827.00 $ 6,883.00 240 3402 GENERATOR 500-599 KVA 600 VOLT $ 1,301.00 $ 3,229.00 $ 9,123.00 240 3410 GENERATOR 600-699 KVA $ 1,420.00 $ 2,778.00 $ 8,266.00 240 3411 GENERATOR 600-699 KVA 600 VOLT $ 1,495.00 $ 3,755.00 $ 10,665.00 #4..
- 281 -
240 3412 GENERATOR 600-699 KVA TIER 4 $ 2,164.00 $ 4,327.00 $ 12,980.00 240 3413 GENERATOR 600-699 KVA OFF SHORE $ 1,241.00 $ 4,965.00 $ 19,861.00 240 3481 GENERATOR 800-999 KVA $ 2,036.00 $ 3,624.00 $ 10,632.00 240 3482 GENERATOR 800-999 KVA 600 VOLT $ 2,668.00 $ 5,726.00 $ 16,225.00 240 3490 GENERATOR 1000-1199 KVA $ 3,766.00 $ 6,299.00 $ 19,064.00 240 4050 GENERATOR 1200-1399 KVA TIER 4 $ 3,951.00 $ 7,901.00 $ 23,650.00 240 4051 GENERATOR 1200-1399 KVA $ 2,825.00 $ 5,650.00 $ 16,949.00 240 4052 GENERATOR 1200-1399 KVA 600 VOLT $ 2,792.00 $ 6,205.00 $ 17,048.00 240 4057 GENERATOR 1400-1799 KVA TIER 4 $ 4,400.00 $ 8,800.00 $ 26,000.00 240 4060 GENERATOR 1800-1999 KVA $ 4,300.00 $ 8,600.00 $ 25,800.00 240 4063 GENERATOR 2000-2199 KVA $ 5,375.00 $ 10,750.00 $ 32,250.00 240 4065 GENERATOR 2200-2499 KVA $ 5,735.00 $ 11,470.00 $ 34,400.00 241 50 LOAD BANK 17.5KW RACK MOUNT $ 254.00 $ 533.00 $ 1,660.00 241 60 LOAD BANK 100KW NETWORKABLE $ 327.00 $ 545.00 $ 1,417.00 241 100 LOAD BANK 100KW $ 291.00 $ 581.00 $ 1,743.00
241 125 LOAD BANK 125 KW $ 291.00 $ 581.00 $ 1,743.00
241 150 LOAD BANK 150KW AUTO $ 375.00 $ 722.00 $ 2,256.00 241 200 LOAD BANK 200-299KW RESISTIVE $ 349.00 $ 697.00 $ 2,091.00 241 350 LOAD BANK 400KW NETWORKABLE $ 474.00 $ 948.00 $ 2,843.00 241 401 LOAD BANK 400KW RESISTIVE 600 VOLT $ 1,360.00 $ 2,662.00 $ 8,284.00 241 500 LOAD BANK 600KW 600 VOLT $ 697.00 $ 1,394.00 $ 4,182.00 241 600 LOAD BANK 600-699KW RESISTIVE $ 971.00 $ 1,561.00 $ 4,854.00 241 725 LOAD BANK 700KW $ 813.00 $ 1,626.00 $ 4,879.00
241 825 LOAD BANK 1000KW NETWORKABLE $ 1,046.00 $ 2,091.00 $ 6,273.00 241 850 LOAD BANK 1000KW RESISTIVE $ 1,315.00 $ 2,452.00 $ 7,626.00 241 900 LOAD BANK 1250KW $ 1,453.00 $ 2,904.00 $ 8,713.00 241 915 LOAD BANK 1250KW NETWORKABLE $ 1,743.00 $ 3,485.00 $ 10,456.00 241 925 LOAD BANK 2000KW RESISTIVE $ 3,345.00 $ 5,307.00 $ 16,520.00 241 1000 LOAD BANK 2500KW RESISTIVE $ 4,304.00 $ 7,103.00 $ 22,112.00 241 1001 LOAD BANK 2500KW 600V $ 4,026.00 $ 8,052.00 $ 24,155.00 241 1150 LOAD BANK 3000KW RESISTIVE $ 3,730.00 $ 7,105.00 $ 22,125.00 241 1900 LOAD BANK 1.8MVA RES/REAC $ 3,485.00 $ 5,228.00 $ 15,684.00 241 2000 LOAD BANK 3.3MVA RES/REAC $ 5,809.00 $ 9,201.00 $ 27,603.00 241 2100 LOAD BANK 6.25MVA RES/REAC $ 11,618.00 $ 17,426.00 $ 52,279.00 241 3450 TRANSFORMER ISOLATION 208V/208V $ 194.00 $ 312.00 $ 971.00 241 3459 TRANSFORMER 15KVA MILL PANEL 480/575V $ 131.00 $ 286.00 $ 773.00 241 3460 TRANSFORMER 30KVA MILL PANEL 480/575V $ 162.00 $ 382.00 $ 903.00 241 3465 TRANSFORMER 2500KVA MULTI TAP $ 1,185.00 $ 2,421.00 $ 6,530.00 241 3531 TRANSFORMER 2500KVA 600 - 480V $ 2,329.00 $ 2,663.00 $ 8,291.00 241 3550 TRANSFORMER 25KVA $ 82.00 $ 208.00 $ 482.00
241 3580 TRANSFORMER 45KVA 208/480V 120V AC $ 171.00 $ 312.00 $ 935.00 241 3600 TRANSFORMER 75KVA 3 PHASE $ 281.00 $ 529.00 $ 1,683.00 241 3620 TRANSFORMER 100-149KVA 3 PHASE $ 217.00 $ 398.00 $ 1,200.00 241 3640 TRANSFORMER 150KVA 3 PHASE $ 312.00 $ 592.00 $ 1,931.00 241 3642 TRANSFORMER 150KVA 400 AMP DIST PANEL $ 223.00 $ 551.00 $ 1,419.00 241 3650 TRANSFORMER 225KVA 3 PHASE DRY $ 339.00 $ 728.00 $ 2,082.00 241 3660 TRANSFORMER 300KVA 3 PHASE $ 398.00 $ 758.00 $ 2,200.00 241 3661 TRANSFORMER 300KVA 1200AMP PANEL $ 289.00 $ 575.00 $ 1,792.00 241 3680 TRANSFORMER 750KVA 3 PHASE DRY $ 566.00 $ 940.00 $ 3,032.00 241 3690 TRANSFORMER 1000KVA 3 PHASE DRY $ 729.00 $ 1,464.00 $ 4,393.00 241 3700 TRANSFORMER 1560KVA 3 PHASE DRY $ 1,522.00 $ 2,531.00 $ 8,118.00 241 3715 TRANSFORMER 5000KVA MULTI TAP $ 7,130.00 $ 7,130.00 $ 21,145.00 241 3718 TRANSFORMER 7000KVA MULTI TAP $ 9,031.00 $ 8,720.00 $ 27,094.00 241 3730 TRANSFORMER 110-150KVA ISOLATION $ 268.00 $ 496.00 $ 1,591.00 241 3885 TRANSFORMER 45KVA 575-208/120V 3 PHASE $ 131.00 $ 269.00 $ 772.00 241 3920 TRANSFORMER 75KVA 480-240/120V 3 PHASE $ 108.00 $ 282.00 $ 637.00 241 3925 TRANSFORMER 75KVA 200 AMP DIST PANEL $ 127.00 $ 286.00 $ 855.00 241 3930 TRANSFORMER 112.5KVA 480-208/120V 3 PHAS $ 159.00 $ 305.00 $ 927.00 241 3975 TRANSFORMER 225KVA 575-460V 3 PHASE $ 161.00 $ 436.00 $ 989.00 241 4795 QUAD BOX MINI 10/5 (30 AMP) $ 20.00 $ 38.00 $ 121.00 241 4812 QUAD BOX 12/5 EXTENSION CORD 50' $ 23.00 $ 44.00 $ 137.00 241 4813 QUAD BOX 12/5 EXTENSION CORD 100' $ 38.00 $ 69.00 $ 181.00 #4..
- 282 -
241 4816 QUAD BOX STRING 10/5 (30 AMP) $ 26.00 $ 49.00 $ 153.00 241 4821 QUAD BOX 10/5 EXTENSION CORD 50' 30AMP $ 15.00 $ 30.00 $ 91.00 241 4824 QUAD BOX 10/5 EXTENSION CORD 100' 30AMP $ 25.00 $ 49.00 $ 148.00 241 4827 QUAD BOX STRING GFCI 50' W/20' SPACING $ 23.00 $ 41.00 $ 116.00 241 4865 QUAD BOX FEEDER PANEL 100 AMP UL CAM $ 87.00 $ 137.00 $ 399.00 241 4870 QUAD BOX FEEDER PANEL 100 AMP X 30 AMP $ 125.00 $ 207.00 $ 612.00 241 4875 QUAD BOX FEEDER PANEL 200 AMP $ 139.00 $ 277.00 $ 803.00 241 4876 QUAD BOX FEEDER PANEL 200 AMP X 30 AMP $ 260.00 $ 500.00 $ 1,588.00 241 4885 EDISON PANEL 100 AMP UL CAM GFCI $ 75.00 $ 168.00 $ 492.00 241 4900 200 AMP CAM/50 AMP SPLITTER PANEL UL $ 97.00 $ 228.00 $ 487.00 241 4905 400A CAM/100A 208V SPLITTER PANEL UL $ 137.00 $ 269.00 $ 742.00 241 4910 400A CAM/100A 480V SPLITTER PANEL $ 130.00 $ 271.00 $ 791.00 241 4912 600 AMP MULTI PANEL $ 206.00 $ 345.00 $ 1,002.00 241 4915 1200 AMP MULTI PANEL $ 290.00 $ 548.00 $ 1,683.00 241 4917 200 AMP MULTI PANEL $ 131.00 $ 190.00 $ 650.00 241 4920 400 AMP 480V MULTI PANEL $ 222.00 $ 484.00 $ 1,470.00 241 4947 6000AMP COMMON BUSS $ 455.00 $ 1,301.00 $ 3,329.00 241 4960 MINI CAM 50' $ 23.00 $ 44.00 $ 133.00
241 5105 STARLINE TERMINAL BLOCK 225A $ 95.00 $ 177.00 $ 551.00 241 5110 STARLINE TERMINAL BLOCK 250A $ 94.00 $ 185.00 $ 562.00 241 5125 STARLINE TERMINAL TAP CAN 400A $ 63.00 $ 127.00 $ 380.00 241 5190 NEUTRAL GROUND RESISTOR 600V $ 106.00 $ 399.00 $ 1,211.00 241 5200 PANEL POWER DISTRIBUTION $ 575.00 $ 1,150.00 $ 3,451.00 241 5204 30KVA POWER DISTRIBUTION 480/600V INPUT $ 95.00 $ 243.00 $ 556.00 241 5205 POWER DISTRIBUTION PANEL $ 101.00 $ 208.00 $ 602.00 241 5207 DIST PANEL WITH 50A TWIST LOCK 400A RV $ 244.00 $ 401.00 $ 1,263.00 241 5215 DISTRIBUTION PANEL 10 OUTLET $ 60.00 $ 264.00 $ 793.00 241 5230 DISTRIBUTION BOX 50 X 30 AMP RV $ 44.00 $ 93.00 $ 181.00 241 5231 DISTRIBUTION BOX 50 AMP RV $ 44.00 $ 114.00 $ 268.00 241 5233 DISTRIBUTION PANEL 200 AMP $ 227.00 $ 441.00 $ 1,380.00 241 5246 DISTRIBUTION BOX 200 AMP RV $ 137.00 $ 269.00 $ 786.00 241 5350 HARDWIRE PANEL 200 AMP $ 144.00 $ 232.00 $ 677.00 241 5355 HARDWIRE PANEL 400 AMP $ 202.00 $ 405.00 $ 1,285.00 241 5357 HARDWIRE PANEL 800 AMP $ 375.00 $ 722.00 $ 2,256.00 241 5362 SPIDER BOX PANEL GFCI $ 137.00 $ 274.00 $ 807.00 241 5425 200 AMP TRANSFER SWITCH DUAL $ 337.00 $ 520.00 $ 1,462.00 241 5440 400 AMP TRANSFER SWITCH DUAL $ 473.00 $ 801.00 $ 2,441.00 241 5445 600 AMP NEMA 1 480V TRANSFER SWITCH $ 430.00 $ 827.00 $ 2,493.00 241 5446 600 AMP TRANSFER SWITCH DUAL $ 470.00 $ 887.00 $ 2,759.00 241 5450 600 AMP NEMA 1 DUAL VOLT TRANSFER SWITCH $ 599.00 $ 904.00 $ 2,808.00 241 5455 800 AMP TRANSFER SWITCH DUAL $ 337.00 $ 506.00 $ 1,457.00 241 5460 1200 AMP TRANSFER SWITCH DUAL $ 329.00 $ 606.00 $ 1,526.00 241 5488 800 AMP TRANSFER SWITCH MANUAL 208-600V $ 312.00 $ 568.00 $ 1,768.00 241 5500 200 AMP DISCONNECT $ 124.00 $ 225.00 $ 702.00
241 5505 400 AMP DISCONNECT $ 206.00 $ 351.00 $ 1,101.00 241 5510 2000 AMP 480V DISCONNECT $ 610.00 $ 950.00 $ 2,820.00 241 5515 3000 AMP DISCONNECT $ 993.00 $ 2,585.00 $ 5,660.00 241 5620 800 AMP DISCONNECT $ 565.00 $ 874.00 $ 2,695.00 241 5725 50 AMP CALIFORNIA TO 50 AMP RV ADAPTOR $ 15.00 $ 33.00 $ 94.00 241 5950 CABLE TAIL #2 MALE $ 9.00 $ 14.00 $ 33.00
241 5955 CABLE TAIL #2 FEMALE $ 6.00 $ 13.00 $ 24.00
241 5970 CABLE TAIL 4/0 MALE $ 10.00 $ 15.00 $ 33.00
241 5980 CABLE TAIL 4/0 FEMALE $ 6.00 $ 11.00 $ 24.00
241 5988 CABLE TAIL 6/4 FEMALE $ 6.00 $ 11.00 $ 23.00
241 5989 CABLE TAIL 6/4 MALE $ 9.00 $ 14.00 $ 33.00
241 5994 2000 AMP TRANSFER SWITCH 480V $ 497.00 $ 981.00 $ 2,900.00 241 6610 CORD RACK MOUNT C19/20 $ 3.00 $ 3.00 $ 10.00
241 6700 CABLE 4/4 TYPE W SO (93 AMP) 50' $ 20.00 $ 44.00 $ 110.00 241 6705 CABLE 4/4 TYPE W SO (93 AMP) 100' $ 45.00 $ 85.00 $ 262.00 241 6710 CABLE 2/4 TYPE W SO (122 AMP) 50' $ 30.00 $ 30.00 $ 91.00 241 6720 CABLE 2-0/4 TYPE W SO (192 AMP) 50' $ 44.00 $ 85.00 $ 248.00 241 6745 CABLE 8/4 TYPE W SO (54 AMP) 35' $ 20.00 $ 34.00 $ 109.00 #4..
- 283 -
241 6750 CABLE 4/4 TYPE W SO (54 AMP) 25' $ 16.00 $ 32.00 $ 99.00 241 6755 CABLE 4/4 TYPE W SO (54 AMP) 75' $ 14.00 $ 31.00 $ 106.00 241 6802 CABLE 4/0 TYPE W EXT 10' W/BLK M&F CAM $ 31.00 $ 60.00 $ 179.00 241 6805 CABLE 4/5 BANDED CAMLOCK (140 AMP) 50' $ 26.00 $ 70.00 $ 160.00 241 6810 CABLE 4/5 BANDED CAMLCK MALE 140 AMP 10' $ 7.00 $ 15.00 $ 39.00 241 7075 CABLE JUMPERS $ 14.00 $ 14.00 $ 19.00
241 7076 CABLE 4/0 X 3' JUMPER $ 8.00 $ 15.00 $ 47.00
241 7077 CABLE 4/0 JUMPER DOUBLE FEMALE $ 7.00 $ 9.00 $ 30.00 241 7080 CABLE RAMPS $ 21.00 $ 44.00 $ 112.00
241 7105 GROUND ROD $ 14.00 $ 29.00 $ 77.00
241 7140 TEES 400 AMP F/F/M $ 7.00 $ 13.00 $ 40.00
241 7143 TURNAROUND 400A MALE-MALE 16 SERIES $ 9.00 $ 15.00 $ 47.00 241 7144 TURNAROUND 400A FEMALE-FEMALE 16 SERIES $ 9.00 $ 15.00 $ 47.00 241 7145 TEES 400 AMP M/M/F REV $ 8.00 $ 14.00 $ 40.00
241 7150 TEES F/F/M Y CORD WITH TAIL $ 8.00 $ 13.00 $ 40.00 241 7190 CABLE 2/5 X 50' $ 31.00 $ 58.00 $ 161.00
241 7199 CABLE 4/0 X 25' $ 24.00 $ 66.00 $ 204.00
241 7203 CABLE 4/0 X 50' BARE TO BARE $ 26.00 $ 48.00 $ 155.00 241 7275 CABLE 6/4 50 AMP 50' $ 22.00 $ 44.00 $ 118.00
241 7285 CABLE 6/4 - 100' LENGTH $ 29.00 $ 61.00 $ 148.00 241 7643 CABLE TAIL 15KV 4/0 SHLD W/DB15' $ 174.00 $ 174.00 $ 522.00 241 7644 CABLE 15KV 4/0 SHIELD W/DB 50' $ 173.00 $ 219.00 $ 562.00 241 7645 CABLE 15KV 4/0 SHIELD W/SC 50' $ 174.00 $ 174.00 $ 522.00 241 7646 CABLE 15KV 4/0 SHIELD W/DB 100' $ 346.00 $ 346.00 $ 1,107.00 241 7647 CABLE 15KV 4/0 SHIELD W/SC 100' $ 346.00 $ 346.00 $ 1,026.00 241 7652 CABLE 4/0 AWG 400 AMP 25' CAM $ 24.00 $ 43.00 $ 127.00 241 7658 CABLE 1/0 AWG 25' CAM $ 17.00 $ 23.00 $ 70.00
241 7662 CABLE 4/0 AWG 400 AMP 50' CAM $ 32.00 $ 62.00 $ 145.00 241 7795 CABLE #2 X 50' CAMLOCK ENDS $ 8.00 $ 18.00 $ 47.00 241 8010 CABLE BANDED 5 WIRE 50' $ 59.00 $ 120.00 $ 350.00 244 110 CHILLER 10 - 19 TON $ 506.00 $ 1,065.00 $ 3,087.00 244 130 CHILLER 30 - 39 TON $ 625.00 $ 1,249.00 $ 3,920.00 244 1400 CHILLER 400 - 499 TON $ 4,278.00 $ 8,399.00 $ 24,497.00 244 160 CHILLER 60 - 79 TON $ 1,070.00 $ 2,138.00 $ 6,299.00 244 2200 CHILLER 200 - 249 TON MOBILE $ 2,687.00 $ 5,375.00 $ 16,125.00 244 2226 CHILLER 500 TON AIR COOLED $ 5,966.00 $ 10,429.00 $ 32,490.00 244 225 CHILLER 125 - 149 TON $ 2,150.00 $ 4,300.00 $ 12,900.00 244 2257 DEHUMIDIFIER DESICCANT 500 CFM $ 583.00 $ 1,150.00 $ 4,816.00 244 2261 DEHUMIDIFIER DESICCANT 2000 CFM $ 804.00 $ 1,534.00 $ 4,610.00 244 2264 DEHUMIDIFIER DESICCANT 5000 CFM $ 4,811.00 $ 9,621.00 $ 28,865.00 244 2265 DEHUMIDIFIER DESICCANT 5000 CFM E/G $ 1,511.00 $ 7,373.00 $ 30,885.00 244 2275 DEHUMIDIFIER DESICCANT 15000 CFM $ 3,499.00 $ 14,394.00 $ 61,757.00 244 2370 CHILLER 70 TON $ 1,778.00 $ 2,789.00 $ 8,283.00 244 240 CHILLER 100 - 124 TON $ 1,801.00 $ 3,601.00 $ 10,750.00 244 2420 CHILLER PUMP 250 GPM $ 171.00 $ 280.00 $ 851.00 244 2430 CHILLER PUMP 550 GPM $ 125.00 $ 244.00 $ 726.00 244 2431 CHILLER PUMP 1200-1500 GPM $ 436.00 $ 855.00 $ 2,571.00 244 2432 CHILLER PUMP 700 GPM $ 354.00 $ 613.00 $ 1,851.00 244 2435 CHILLER PUMP 3000 GPM $ 1,195.00 $ 2,009.00 $ 6,247.00 244 25 HOSE TPU CHILLER 4" X 25' $ 17.00 $ 34.00 $ 104.00 244 2503 AIR CONDITION 3.5 TON WITH HEAT $ 482.00 $ 772.00 $ 2,365.00 244 2505 AIR CONDITION 5 TON DX 208V $ 496.00 $ 1,011.00 $ 3,033.00 244 2506 AIR CONDITION 5 TON DX 480V $ 496.00 $ 1,011.00 $ 3,033.00 244 2507 AIR CONDITION 12 TON CLIMATE 480V $ 901.00 $ 1,714.00 $ 4,006.00 244 2509 AIR CONDITION 10 TON DX 480V $ 617.00 $ 1,217.00 $ 3,509.00 244 2510 AIR CONDITION 10 TON DX 208V $ 583.00 $ 1,172.00 $ 3,509.00 244 2512 AIR CONDITION 10 TON VERTICAL $ 470.00 $ 896.00 $ 2,873.00 244 2513 AIR CONDITION 12 TON PAC SLIM $ 901.00 $ 1,714.00 $ 4,006.00 244 2514 AIR CONDITION 12 TON CLIMATE 208V W/HEAT $ 901.00 $ 1,714.00 $ 4,006.00 244 2515 AIR CONDITION 15 TON DX 208V $ 458.00 $ 1,434.00 $ 3,381.00 244 2521 AIR CONDITION 20 TON HIGH STATIC $ 1,320.00 $ 3,402.00 $ 7,265.00 244 2523 AIR CONDITION 20-25 TON VERTICAL $ 895.00 $ 1,898.00 $ 4,653.00 #4..
- 284 -
244 2524 AIR CONDITION 25-30 TON WITH HEAT 480V $ 908.00 $ 1,905.00 $ 5,716.00 244 2525 AIR CONDITION 25-30 TON WITH HEAT 600V $ 1,364.00 $ 2,234.00 $ 6,949.00 244 2540 AIR CONDITION 40 TON $ 1,075.00 $ 2,150.00 $ 6,450.00 244 2541 AIR CONDITION 40 TON XP HIGH STATIC $ 1,301.00 $ 2,601.00 $ 7,794.00 244 2560 AIR CONDITION 50 - 60 TON $ 1,612.00 $ 3,225.00 $ 9,675.00 244 2565 AIR CONDITION 60 TON HIGH STATIC $ 2,536.00 $ 5,204.00 $ 15,017.00 244 2820 AIR CONDITION 20 TON $ 686.00 $ 1,425.00 $ 3,688.00 244 2830 AIR CONDITION 30 TON 76KW $ 1,123.00 $ 2,247.00 $ 6,719.00 244 2880 AIR CONDITION 80 TON $ 2,298.00 $ 4,179.00 $ 14,031.00 244 2881 AIR CONDITION 80 TON HIGH STATIC (XP) $ 1,227.00 $ 3,141.00 $ 7,512.00 244 3171 AIR CONDITION 5 TON CLIMATE 208V W/HEAT $ 696.00 $ 1,392.00 $ 4,168.00 244 3172 AIR CONDITION 5 TON CLIMATE 480V $ 696.00 $ 1,392.00 $ 4,168.00 244 3173 AIR CONDITION 5 TON CLIMATE 480V W/HEAT $ 696.00 $ 1,392.00 $ 4,168.00 244 3350 AIR HANDLER 50-70 TON $ 635.00 $ 1,256.00 $ 3,771.00 244 3400 AIR HANDLER 100 TON $ 773.00 $ 1,459.00 $ 4,588.00 244 3410 AIR HANDLER 120 TON $ 849.00 $ 1,621.00 $ 4,861.00 244 3420 CHILLER COIL BOX $ 707.00 $ 1,123.00 $ 3,864.00 244 3905 PLATE HEAT EXCHANGER 300-399 SQ FT $ 2,596.00 $ 2,596.00 $ 7,699.00 244 3910 PLATE HEAT EXCHANGER 600-699 SQ FT $ 4,171.00 $ 4,171.00 $ 12,370.00 244 3915 PLATE HEAT EXCHANGER 900-999 SQ FT $ 6,973.00 $ 6,973.00 $ 20,680.00 244 3965 TUBE HEAT EXCHANGER 500-999 SQ FT $ 4,316.00 $ 4,316.00 $ 12,799.00 244 3970 TUBE HEAT EXCHANGER 1000-1999 SQ FT $ 6,062.00 $ 6,062.00 $ 17,977.00 244 3975 TUBE HEAT EXCHANGER 2000-2999 SQ FT $ 7,906.00 $ 8,121.00 $ 25,285.00 244 4050 COOLING TOWER 300 TON $ 801.00 $ 1,700.00 $ 5,440.00 244 4100 COOLING TOWER 500 TON $ 2,311.00 $ 4,389.00 $ 13,659.00 244 4105 COOLING TOWER 1000 TON $ 5,000.00 $ 8,571.00 $ 26,688.00 244 4159 3" X 25' CHILLER SUCTION HOSE $ 14.00 $ 30.00 $ 83.00 244 4160 3" X 50' CHILLER HOSE SUCTION $ 37.00 $ 68.00 $ 216.00 244 4161 4" X 20' CHILLER HOSE SUCTION $ 30.00 $ 47.00 $ 144.00 244 4163 6" X 20' CHILLER HOSE SUCTION $ 7.00 $ 30.00 $ 92.00 244 4164 6" X 25' CHILLER HOSE SUCTION GROOVED $ 34.00 $ 53.00 $ 146.00 244 4165 HOSE TPU CHILLER 3" X 25' $ 21.00 $ 32.00 $ 91.00 244 4166 HOSE TPU CHILLER 3" X 50' $ 18.00 $ 36.00 $ 112.00 244 4170 2"-150# CHILLER HOSE W/QUICK CONNECTS $ 17.00 $ 37.00 $ 106.00 244 4175 3"-150# CHILLER HOSE W/QUICK CONNECTS $ 32.00 $ 46.00 $ 141.00 244 4180 4"-150# CHILLER HOSE W/QUICK CONNECTS $ 22.00 $ 41.00 $ 120.00 244 4189 A/C DUCT Y SPLITTER $ 31.00 $ 62.00 $ 183.00
244 4190 CHILLER VALVES LESS THAN 6" $ 17.00 $ 34.00 $ 109.00 244 4198 CHILLER MANIFOLDS $ 67.00 $ 107.00 $ 330.00
244 4201 TOWER PUMP 1500 GPM 50HP $ 332.00 $ 898.00 $ 2,604.00 244 4405 VICTAULIC FITTING 3" $ 10.00 $ 17.00 $ 54.00
244 4410 VICTAULIC FITTING 4" $ 9.00 $ 17.00 $ 52.00
244 4415 VICTAULIC FITTING 6" $ 9.00 $ 18.00 $ 53.00
244 4496 VICTAULIC ELBOW 3" 90 DEGREE $ 10.00 $ 15.00 $ 46.00 244 4510 VICTAULIC ELBOW 6" 45 DEGREE $ 11.00 $ 22.00 $ 63.00 244 4511 VICTAULIC ELBOW 6" 90 DEGREE $ 7.00 $ 13.00 $ 39.00 244 4512 VICTAULIC TO FLANGE 6" $ 13.00 $ 23.00 $ 72.00 244 4514 VICTAULIC TO FLANGE FITTING 8" $ 11.00 $ 22.00 $ 70.00 244 4517 TEE 6", VICTAULIC $ 15.00 $ 25.00 $ 77.00
244 4520 VICTAULIC REDUCER 6" X 4" $ 5.00 $ 8.00 $ 25.00 244 4710 6" FLANGE 25' HOSE $ 30.00 $ 56.00 $ 174.00
244 4750 4" STEEL BRAIDED HOSE 20' $ 118.00 $ 225.00 $ 702.00 244 4755 4" QUICK CONNECT 90'S $ 22.00 $ 45.00 $ 131.00 244 4770 4" FLANGE TO 4" QUICK CONNECT MALE $ 13.00 $ 24.00 $ 75.00 244 4980 DUCT 12"X8' W/CEILING TILE KIT $ 17.00 $ 33.00 $ 92.00 244 4985 DUCT 16"X8' W/CEILING TILE KIT $ 10.00 $ 22.00 $ 66.00 244 50 HOSE TPU CHILLER 4" X 50' $ 17.00 $ 38.00 $ 113.00 244 5050 A/C DUCTING 12" X 25' $ 17.00 $ 41.00 $ 114.00 244 5054 A/C DUCTING 14" X 25' $ 17.00 $ 43.00 $ 117.00 244 5125 A/C DUCTING 16" X 25' SUPPLY $ 38.00 $ 59.00 $ 170.00 244 5200 A/C DUCTING 20" X 25' $ 41.00 $ 87.00 $ 237.00 244 5203 A/C DUCTING 20" X 25' RETURN 3" PITCH $ 41.00 $ 87.00 $ 237.00 #4..
- 285 -
244 5210 A/C DUCTING Y 20" SPLITTER $ 11.00 $ 25.00 $ 77.00 244 55 HOSE TPU CHILLER 6" X 50' $ 30.00 $ 70.00 $ 178.00 244 57 HOSE TPU CHILLER 6" X 25' $ 52.00 $ 43.00 $ 224.00 250 120 PROPANE TANK 33# VAPOR $ 6.00 $ 11.00 $ 19.00
250 995 BLOWER AXIAL 8" ELECTRIC $ 46.00 $ 103.00 $ 284.00 250 1000 BLOWER AXIAL 12" ELECTRIC $ 59.00 $ 131.00 $ 312.00 250 1013 BLOWER AXIAL 20" ELECTRIC $ 74.00 $ 189.00 $ 452.00 250 1015 BLOWER VANEAXIAL 12" ELECTRIC EXP PROOF $ 124.00 $ 269.00 $ 653.00 250 1060 BLOWER 8,000-11,000 CFM $ 80.00 $ 180.00 $ 426.00 250 1080 BLOWER VENTILATION 12,000 CFM DIESEL $ 389.00 $ 981.00 $ 2,584.00 250 1150 DUCT HOSE 8" X 25' $ 18.00 $ 50.00 $ 97.00
250 1161 HEAT DUCT 12" X 25' HIGH TEMP $ 26.00 $ 64.00 $ 182.00 250 1164 HEAT DUCT 16" X 25' HIGH TEMP $ 21.00 $ 50.00 $ 123.00 250 1168 HEAT DUCT 20" X 25' HIGH TEMP $ 35.00 $ 77.00 $ 226.00 250 1175 DUCT HOSE 12" X 25' $ 22.00 $ 60.00 $ 116.00
250 1179 DUCT HOSE 12" X 12' $ 18.00 $ 30.00 $ 89.00
250 1183 DUCT HOSE 20" X 25' $ 18.00 $ 88.00 $ 90.00
250 1710 AIR CIRCULATING FAN 28"-36" $ 57.00 $ 126.00 $ 300.00 250 1836 DRUM FAN 36" $ 51.00 $ 115.00 $ 280.00
250 1842 DRUM FAN 42" $ 61.00 $ 143.00 $ 353.00
250 1848 DRUM FAN 48" $ 70.00 $ 171.00 $ 426.00
250 2130 FAN PEDESTAL 30" $ 22.00 $ 76.00 $ 163.00
250 2155 FAN WATER COOLED LARGE $ 236.00 $ 532.00 $ 1,300.00 250 2160 FAN WATER COOLED $ 177.00 $ 384.00 $ 886.00
250 2166 FAN HIGH VOLUME 20" $ 40.00 $ 126.00 $ 306.00
250 2200 AIR CIRCULATING FAN 42" $ 61.00 $ 156.00 $ 380.00 250 2205 AIR CIRCULATING FAN 48" $ 60.00 $ 135.00 $ 320.00 250 2208 EVAPORATIVE COOLING FAN 16"-18" $ 61.00 $ 136.00 $ 324.00 250 2210 EVAPORATIVE COOLING FAN 48" $ 168.00 $ 431.00 $ 1,129.00 250 2213 EVAPORATIVE COOLING FAN 24"-36" $ 154.00 $ 345.00 $ 829.00 250 2250 DEHUMIDIFIER SMALL $ 67.00 $ 198.00 $ 469.00
250 2275 DEHUMIDIFIER MEDIUM $ 89.00 $ 224.00 $ 533.00
250 2280 DEHUMIDIFIER LARGE $ 131.00 $ 291.00 $ 692.00
250 2300 AIR PURIFIER $ 91.00 $ 259.00 $ 764.00
250 2325 CARPET BLOWER DRYER $ 31.00 $ 67.00 $ 161.00
250 2350 CARPET BLOWER DRYER 3 SPEED $ 31.00 $ 71.00 $ 170.00 250 2445 HEATER ELECTRIC 9KW-15KW 240V 1 PHASE $ 61.00 $ 164.00 $ 363.00 250 2446 HEATER ELECTRIC 15KW-30KW 480V 3 PHASE $ 79.00 $ 219.00 $ 510.00 250 2475 HEATER INDIRECT 400K BTU $ 220.00 $ 533.00 $ 1,206.00 250 3005 HEATER SPACE INDIRECT 90K-100K BTU KERO $ 83.00 $ 206.00 $ 633.00 250 3025 HEATER SPACE 150K BTU PROPANE $ 67.00 $ 172.00 $ 382.00 250 3035 HEATER SPACE 200K BTU KEROSENE $ 85.00 $ 207.00 $ 474.00 250 3040 HEATER INDIRECT 200K-250K BTU KEROSENE $ 181.00 $ 441.00 $ 995.00 250 3065 HEATER INDIRECT 300K BTU KEROSENE $ 190.00 $ 529.00 $ 1,035.00 250 3100 HEATER DIRECT 400K BTU $ 99.00 $ 256.00 $ 586.00 250 3115 HEATER INDIRECT 500K BTU DUAL FUEL $ 510.00 $ 1,421.00 $ 2,994.00 250 3116 HEATER 660K BTU FLAMELESS TOWABLE $ 450.00 $ 2,451.00 $ 8,381.00 250 3117 HEATER INDIRECT 700K BTU LPG/NATURAL GAS $ 591.00 $ 1,477.00 $ 3,544.00 250 3118 HEATER INDIRECT 700K BTU SELF CONTAINED $ 891.00 $ 1,876.00 $ 6,245.00 250 3119 HEATER 550K BTU FLAMELESS $ 343.00 $ 2,283.00 $ 7,319.00 250 3121 HEATER INDIRECT 750K BTU DIESEL $ 672.00 $ 1,818.00 $ 4,368.00 250 3122 HEATER 1MM BTU DSL HIGH VOLUME TOWABLE $ 678.00 $ 1,705.00 $ 4,264.00 250 3123 HEATER INDIRECT 1MM BTU SKID MOUNTED $ 345.00 $ 976.00 $ 3,133.00 250 3124 HEATER DIRECT 1MM BTU $ 149.00 $ 400.00 $ 860.00 250 3125 HEATER DIRECT 1.5MM BTU $ 341.00 $ 1,076.00 $ 2,248.00 250 3129 HEATER 1.2MM BTU FLAMELESS TOWABLE $ 1,292.00 $ 3,877.00 $ 9,476.00 250 3170 HEATER INFRARED 110K BTU KEROSENE $ 82.00 $ 208.00 $ 496.00 250 3260 HEATER CONVECTION 200K-250K BTU $ 28.00 $ 80.00 $ 168.00 250 3405 HEATER 6KW ELECTRIC 220V $ 35.00 $ 92.00 $ 241.00 250 3415 HEATER 9 KW ELECTRIC 220V $ 60.00 $ 118.00 $ 366.00 250 3428 HEATER 1.5 KW 110V ELECTRIC $ 39.00 $ 109.00 $ 287.00 250 3433 HEATER 208V ELECTRIC $ 89.00 $ 189.00 $ 469.00 #4..
- 286 -
250 3434 HEATER 65K BTU 240V/3PH ELECTRIC $ 236.00 $ 473.00 $ 1,418.00 250 3436 HEATER 240V ELECTRIC $ 106.00 $ 236.00 $ 605.00 250 3437 HEATER 136K BTU 480V ELECTRIC $ 139.00 $ 367.00 $ 835.00 250 3439 HEATER 65K BTU 240V/1PH ELECTRIC $ 123.00 $ 357.00 $ 745.00 250 3441 HEATER FORCED AIR 30-50K BTU $ 39.00 $ 119.00 $ 236.00 250 3443 HEATER 15 KW 480V ELECTRIC $ 208.00 $ 320.00 $ 891.00 250 3444 HEATER 30 KW 480V ELECTRIC $ 211.00 $ 324.00 $ 891.00 250 3447 HEATER INLINE 50 - 75 KW $ 272.00 $ 543.00 $ 1,613.00 250 3460 HEATER 165-175K BTU KEROSENE $ 67.00 $ 188.00 $ 445.00 250 3477 HEATER 400K BTU NATURAL GAS $ 261.00 $ 665.00 $ 1,602.00 250 3483 HEATER 350K BTU DUCTED LPG/NATURAL GAS $ 211.00 $ 587.00 $ 1,365.00 250 3484 HEATER 400K BTU DUCTED $ 261.00 $ 630.00 $ 1,697.00 250 3485 HEATER 500K BTU DUCTED DIESEL $ 184.00 $ 513.00 $ 1,339.00 250 3486 HEATER 350K BTU DUCTED DIESEL $ 214.00 $ 593.00 $ 1,339.00 250 3488 HEATER 400K BTU FLAMELESS TOWABLE $ 530.00 $ 1,594.00 $ 4,569.00 250 3530 HEATER 400K BTU KEROSENE $ 187.00 $ 378.00 $ 1,029.00 250 3557 PROPANE TANK 7.5 GALLON 30# $ 6.00 $ 12.00 $ 25.00 250 3576 PROPANE TANK 10 FORKLIFT $ 17.00 $ 17.00 $ 52.00 250 3600 PROPANE TANK 25 GALLON 100# $ 7.00 $ 13.00 $ 35.00 250 3650 PROPANE TANK 33# LIQUID $ 5.00 $ 12.00 $ 20.00 250 5900 SENTRY NEGATIVE AIR FILTER $ 93.00 $ 222.00 $ 575.00 250 5905 AIR SCRUBBER 500 CFM $ 92.00 $ 241.00 $ 548.00 250 5919 AIR SCRUBBER 1900 CFM $ 129.00 $ 295.00 $ 751.00 250 5920 AIR SCRUBBER 2400 CFM $ 187.00 $ 470.00 $ 1,174.00 250 6110 SPOT COOLER 10-14K BTU 1.2 TON 110V $ 249.00 $ 506.00 $ 1,392.00 250 6111 SPOT COOLER 10K-14K BTU W/HEAT $ 249.00 $ 506.00 $ 1,392.00 250 6120 SPOT COOLER 18K BTU 1.5 TON 110V $ 209.00 $ 458.00 $ 1,193.00 250 6121 SPOT COOLER 18K BTU WATER COOLED $ 204.00 $ 495.00 $ 1,218.00 250 6130 SPOT COOLER 22K BTU 1.8 TON 208V $ 234.00 $ 538.00 $ 1,340.00 250 6135 SPOT COOLER 36K BTU 3 TON 220V $ 418.00 $ 797.00 $ 2,430.00 250 6145 SPOT COOLER 60K BTU 5 TON 480V $ 536.00 $ 1,021.00 $ 3,172.00 250 6146 SPOT COOLER 60K BTU 5 TON 480V W/HEAT $ 493.00 $ 947.00 $ 2,841.00 250 6147 SPOT COOLER 60K BTU 5 TON 480V WATERCOOL $ 493.00 $ 947.00 $ 2,841.00 250 6150 SPOT COOLER 65K BTU 5 TON 240V $ 493.00 $ 947.00 $ 2,841.00 250 6151 SPOT COOLER 65K BTU 5 TON 240V WATERCOOL $ 493.00 $ 947.00 $ 2,841.00 250 6152 SPOT COOLER 65K BTU 5 TON 208V W/HEAT $ 493.00 $ 947.00 $ 2,841.00 250 6447 HEATER DRY 20-30 KW 600V ELECTRIC $ 89.00 $ 259.00 $ 578.00 250 6455 HEATER DRY 75 KW ELECTRIC $ 595.00 $ 1,014.00 $ 3,146.00 250 6485 HEATER DRY 60 KW ELECTRIC 300 DEGREE $ 461.00 $ 870.00 $ 2,535.00 250 6490 HEATER DRY 150 KW ELECTRIC 300 DEGREE $ 929.00 $ 1,697.00 $ 4,474.00 250 6520 HEATER FORCED AIR 350K-375K BTU LPG $ 123.00 $ 318.00 $ 716.00 250 6525 HEATER INDIRECT 350K-399K BTU LPG/NG $ 87.00 $ 193.00 $ 412.00 250 6812 GROUND HEATER UP TO 2500 SQ FT $ 554.00 $ 1,756.00 $ 4,749.00 250 6815 GROUND HEATER 5000-6000 SQ FT $ 1,082.00 $ 3,045.00 $ 8,198.00 250 6821 GROUND HEATER 11000-12000 SQ FT $ 2,091.00 $ 4,189.00 $ 9,274.00 250 6905 DRYHEAT CENTRAL HEATING UNIT $ 712.00 $ 1,830.00 $ 4,573.00 260 1800 CHAIN HOIST ELECTRIC 1000LB $ 105.00 $ 220.00 $ 540.00 260 1805 CHAIN HOIST ELECTRIC 2000LB $ 123.00 $ 274.00 $ 654.00 260 1810 CHAIN HOIST ELECTRIC 2000/4000 $ 157.00 $ 350.00 $ 835.00 260 1818 CHAIN HOIST ELECTRIC 10,000LB 230/460 $ 238.00 $ 538.00 $ 1,279.00 260 1860 CHAIN HOIST MANUAL 4,000LB $ 52.00 $ 117.00 $ 278.00 260 1865 CHAIN HOIST MANUAL 6,000LB $ 65.00 $ 144.00 $ 345.00 260 1870 CHAIN HOIST MANUAL 10,000LB $ 87.00 $ 195.00 $ 466.00 260 2967 COME-A-LONG 4000LB $ 28.00 $ 63.00 $ 150.00
260 2975 COME-A-LONG 18000LB $ 84.00 $ 177.00 $ 422.00
260 3005 COME-A-LONG 1500LB $ 20.00 $ 46.00 $ 105.00
260 3015 COME-A-LONG 3000LB $ 27.00 $ 66.00 $ 157.00
260 9910 TIE-DOWN CHAIN - 20 FT $ 2.00 $ 6.00 $ 12.00
260 9920 CHAIN BINDER $ 2.00 $ 6.00 $ 12.00
290 1515 PRUNER POWER CHAIN SAW HEAD $ 71.00 $ 212.00 $ 503.00 290 2100 AERATOR LAWN GAS POWERED $ 98.00 $ 315.00 $ 703.00 290 2130 AERATOR LAWN GAS POWERED LARGE $ 83.00 $ 295.00 $ 709.00 #4..
- 287 -
290 2455 SOD CUTTER 18" $ 137.00 $ 421.00 $ 842.00
290 3010 AUGER GAS 1 MAN $ 79.00 $ 263.00 $ 667.00
290 3012 AUGER HYDRAULIC 1 MAN $ 102.00 $ 347.00 $ 765.00 290 3020 AUGER GAS 2 MAN $ 112.00 $ 290.00 $ 721.00
290 3023 AUGER TOWABLE GAS $ 120.00 $ 330.00 $ 823.00
290 3060 AUGER BIT 6" $ 17.00 $ 40.00 $ 99.00
290 3080 AUGER BIT 8" $ 19.00 $ 49.00 $ 122.00
290 3085 AUGER BIT 8" FOR 1 MAN AUGER $ 10.00 $ 44.00 $ 55.00 290 3100 AUGER BIT 10" $ 13.00 $ 34.00 $ 94.00
290 3120 AUGER BIT 12" $ 23.00 $ 34.00 $ 86.00
290 4325 CHIPPER 6" SELF FEED $ 234.00 $ 560.00 $ 1,430.00 290 4450 CHIPPER 12"-13" $ 488.00 $ 1,216.00 $ 2,867.00 290 4456 CHIPPER 18" $ 407.00 $ 1,403.00 $ 3,506.00
290 4800 SPLITTER LOG GAS HYDRAULIC $ 107.00 $ 267.00 $ 779.00 290 4925 STUMP GRINDER MEDIUM 11-14HP $ 217.00 $ 705.00 $ 1,639.00 290 4955 STUMP GRINDER 35HP HYDRAULIC $ 294.00 $ 969.00 $ 2,159.00 290 4960 STUMP GRINDER 20-30HP HYDRAULIC $ 287.00 $ 907.00 $ 1,577.00 290 6565 MOWER COMMERCIAL 60"-65" $ 168.00 $ 524.00 $ 1,012.00 290 7380 MOWER WEED SELF POWERED $ 121.00 $ 367.00 $ 881.00 290 7450 TILLER 5HP WALKBEHIND $ 84.00 $ 265.00 $ 506.00 290 7485 TILLER 6-8HP REAR TINE $ 89.00 $ 243.00 $ 729.00 290 7530 TILLER 13HP WALKBEHIND REAR TINE $ 144.00 $ 404.00 $ 1,211.00 290 7925 BACKPACK BLOWER LARGE $ 42.00 $ 136.00 $ 295.00 290 7958 BLOWER WALKBEHIND 13HP $ 72.00 $ 184.00 $ 503.00 290 8300 SPRAYER 3 GALLON HAND $ 8.00 $ 18.00 $ 48.00
290 8550 STRAW BLOWER $ 222.00 $ 568.00 $ 1,410.00
290 8640 ROLLER LAWN $ 17.00 $ 51.00 $ 109.00
290 8813 HYDROSEEDER 600-800 GALLON $ 290.00 $ 959.00 $ 1,707.00 290 9475 LADDER STEP 16' $ 62.00 $ 188.00 $ 314.00
290 9480 LADDER STEP 16' FIBERGLASS $ 62.00 $ 188.00 $ 314.00 300 1000 SCISSOR LIFT 10-13' ELECTRIC $ 137.00 $ 266.00 $ 465.00 300 1500 SCISSOR LIFT 14-18' ELECTRIC $ 145.00 $ 290.00 $ 439.00 300 1512 VERTICAL LIFT 12' ELEC SELF PROPELLED $ 142.00 $ 290.00 $ 465.00 300 1515 VERTICAL LIFT 15' ELEC SELF PROPELLED $ 173.00 $ 325.00 $ 526.00 300 1520 VERTICAL LIFT 20' ELEC SELF PROPELLED $ 183.00 $ 367.00 $ 573.00 300 1999 SCISSOR LIFT 18-19' ELECTRIC 60" LENGTH $ 156.00 $ 273.00 $ 490.00 300 2000 SCISSOR LIFT 19' ELECTRIC $ 161.00 $ 295.00 $ 520.00 300 2001 SCISSOR LIFT 20-21' ELECTRIC $ 168.00 $ 301.00 $ 544.00 300 2003 SCISSOR LIFT 20-21' ELECTRIC POWER DECK $ 168.00 $ 301.00 $ 544.00 300 2080 PUSHAROUND 15-20' DC $ 145.00 $ 343.00 $ 606.00 300 2514 SCISSOR LIFT 24-26' ELECTRIC 68" LENGTH $ 219.00 $ 406.00 $ 794.00 300 2515 SCISSOR LIFT 24-26' ELECTRIC 30-36" WIDE $ 219.00 $ 406.00 $ 794.00 300 2525 SCISSOR LIFT 24-26' ELECTRIC 46-68" WIDE $ 219.00 $ 406.00 $ 794.00 300 2545 SCISSOR LIFT 25-27' ELECTRIC 4WD $ 241.00 $ 516.00 $ 1,098.00 300 2551 SCISSOR LIFT 25-27' IC 4WD $ 261.00 $ 626.00 $ 1,287.00 300 2575 PUSHAROUND LIFT STRADDLE ATTACHMENT $ 157.00 $ 351.00 $ 754.00 300 2580 PUSHAROUND 20-25' DC $ 174.00 $ 406.00 $ 719.00 300 2995 SCISSOR LIFT 30-33' ELECTRIC 32" WIDE $ 261.00 $ 621.00 $ 1,167.00 300 2999 SCISSOR LIFT 30-35' ELECTRIC 46-48" WIDE $ 231.00 $ 539.00 $ 994.00 300 3000 SCISSOR LIFT 30-33' ELECTRIC 68" WIDE $ 269.00 $ 626.00 $ 1,166.00 300 3045 SCISSOR LIFT 30-35' ELECTRIC 4WD $ 334.00 $ 678.00 $ 1,359.00 300 3051 SCISSOR LIFT 30-35' IC 4WD $ 325.00 $ 719.00 $ 1,498.00 300 3052 SCISSOR LIFT 30-35' IC 4WD SPEED LEVEL $ 352.00 $ 786.00 $ 1,703.00 300 3080 PUSHAROUND 26-35' DC $ 186.00 $ 429.00 $ 771.00 300 4000 SCISSOR LIFT 39-40' ELECTRIC $ 362.00 $ 794.00 $ 1,557.00 300 4047 SCISSOR LIFT 39-40' ELECTRIC 45-48"WIDE $ 398.00 $ 803.00 $ 1,581.00 300 4051 SCISSOR LIFT 36-49' IC 4WD $ 348.00 $ 794.00 $ 1,617.00 300 4080 PUSHAROUND 36-48' DC $ 226.00 $ 581.00 $ 1,093.00 300 4555 SCISSOR LIFT 45' ELECTRIC 55" WIDE $ 392.00 $ 737.00 $ 1,347.00 300 5050 SCISSOR LIFT 50-59' IC 4WD $ 475.00 $ 1,083.00 $ 2,121.00 300 5060 SCISSOR LIFT 60-70' IC 4WD $ 706.00 $ 1,651.00 $ 3,973.00 310 1035 BOOM 34-40' BUCKET VAN $ 546.00 $ 1,475.00 $ 4,389.00 #4..
- 288 -
310 1230 GLAZIER PACKAGE FOR BOOM $ 15.00 $ 32.00 $ 78.00 310 1526 BOOM VERTICAL MAST 26' SELF PROPELLED $ 310.00 $ 857.00 $ 1,835.00 310 3001 BOOM 30-39' ARTICULATING IC 4WD $ 362.00 $ 892.00 $ 1,899.00 310 3050 BOOM 30-33' ARTICULATING DC $ 318.00 $ 781.00 $ 1,753.00 310 3080 BOOM 30-36' TOWABLE $ 329.00 $ 829.00 $ 1,785.00 310 3450 BOOM 34-39' ARTICULATING DC $ 340.00 $ 837.00 $ 1,819.00 310 3524 BOOM 35-42' GAS/AC ART NARROW CRAWLER $ 518.00 $ 1,295.00 $ 2,959.00 310 4001 BOOM 40-50' ARTICULATING $ 345.00 $ 914.00 $ 2,018.00 310 4003 BOOM 45-50' TELESCOPIC 4WD $ 345.00 $ 914.00 $ 2,018.00 310 4026 BOOM 37-44' TELESCOPIC $ 329.00 $ 847.00 $ 1,956.00 310 4050 BOOM 40-46' ARTICULATING ELEC NARROW $ 352.00 $ 914.00 $ 2,018.00 310 4051 BOOM 43-46' ARTICULATING ELECTRIC $ 373.00 $ 949.00 $ 2,077.00 310 4423 BOOM 42-44' LI/BAT/AC ART NARROW CRAWLER $ 608.00 $ 1,804.00 $ 3,989.00 310 4424 BOOM 42-44' DSL/AC ART NARROW CR $ 705.00 $ 1,502.00 $ 3,171.00 310 5023 BOOM 46-50' TOWABLE $ 364.00 $ 977.00 $ 2,135.00 310 5124 BOOM 49-53' DSL/AC ART NARROW CR $ 1,015.00 $ 2,190.00 $ 5,215.00 310 5423 BOOM 54-56' LI/BAT/AC ART NARROW $ 1,350.00 $ 3,495.00 $ 7,747.00 310 5424 BOOM 54-56' DSL/AC ART NARROW CR $ 1,029.00 $ 2,673.00 $ 6,815.00 310 6001 BOOM 60-64' ARTICULATING $ 466.00 $ 1,173.00 $ 2,812.00 310 6003 BOOM 60-64' ARTICULATING ELEC/MULTI PWR $ 589.00 $ 1,334.00 $ 2,890.00 310 6005 BOOM 60-64' TELESCOPIC ELECT/MULTI PWR $ 466.00 $ 1,173.00 $ 2,867.00 310 6026 BOOM 60-64' TELESCOPIC $ 448.00 $ 1,185.00 $ 2,867.00 310 6027 BOOM 60-64' TELESCOPIC TRACKS $ 594.00 $ 1,484.00 $ 3,639.00 310 6323 BOOM 59-63' LI/BAT/AC ART NARROW $ 1,858.00 $ 4,038.00 $ 8,908.00 310 6526 BOOM 65-70' TELESCOPIC $ 466.00 $ 1,185.00 $ 2,867.00 310 6527 BOOM 65-70' TELESCOPIC TRACKS $ 717.00 $ 1,740.00 $ 3,811.00 310 6923 BOOM 69-72' LI/BAT/AC ART NARROW CRAWLER $ 1,879.00 $ 4,007.00 $ 12,320.00 310 6924 BOOM 69-72' DSL/AC ART NARROW CR $ 1,879.00 $ 4,007.00 $ 12,320.00 310 7524 BOOM 75-85' TELESCOPIC COMPACT T $ 2,581.00 $ 6,310.00 $ 16,924.00 310 7723 BOOM 75-85' LI/BAT/AC STR NARROW CRAWLER $ 2,581.00 $ 6,310.00 $ 16,924.00 310 8001 BOOM 76-80' ARTICULATING $ 784.00 $ 2,074.00 $ 4,605.00 310 8026 BOOM 76-80' TELESCOPIC $ 784.00 $ 2,074.00 $ 4,605.00 310 8526 BOOM 84-86' TELESCOPIC 4WD $ 784.00 $ 2,074.00 $ 4,605.00 310 9626 BOOM 96-105' TELESCOPIC 4WD $ 1,185.00 $ 3,212.00 $ 7,972.00 310 9800 BOOM 125' TELESCOPIC WITH JIB 4WD $ 1,498.00 $ 4,042.00 $ 8,865.00 310 9801 BOOM 125' ARTICULATING IC 4WD $ 1,498.00 $ 4,042.00 $ 8,865.00 310 9826 BOOM 120' TELESCOPIC 4WD $ 1,383.00 $ 3,860.00 $ 8,368.00 310 9830 BOOM 135' TELESCOPIC WITH JIB 4WD $ 1,727.00 $ 4,711.00 $ 9,792.00 310 9835 BOOM 135' ARTICULATING IC 4WD $ 1,821.00 $ 4,830.00 $ 10,897.00 310 9901 BOOM 150' ARTICULATING IC 4WD $ 3,927.00 $ 9,193.00 $ 21,889.00 310 9926 BOOM 150' TELESCOPIC 4WD $ 3,422.00 $ 8,348.00 $ 19,121.00 310 9940 BOOM 180-185' TELESCOPIC $ 5,229.00 $ 12,285.00 $ 27,422.00 320 1200 LIGHT STAND 2 X 1000W METAL HALIDE $ 68.00 $ 150.00 $ 357.00 320 2100 LIGHT STAND 1 X 1000W METAL HALIDE $ 44.00 $ 98.00 $ 233.00 320 2147 LIGHT WOBBLE 1 X 400W 110V METAL HALIDE $ 34.00 $ 76.00 $ 179.00 320 2400 LIGHT STRING 100' $ 27.00 $ 59.00 $ 142.00
320 3050 DISTRIBUTION BOX $ 35.00 $ 62.00 $ 193.00
320 4000 LIGHT TOWER TOWABLE SMALL $ 115.00 $ 281.00 $ 616.00 320 4001 LIGHT TOWER TOWABLE SMALL VERT MAST $ 115.00 $ 281.00 $ 616.00 320 4003 LIGHT TOWER,4-7KW VERT MAST EXTENDED $ 176.00 $ 407.00 $ 1,150.00 320 4005 LIGHT TOWER,8-15KW $ 118.00 $ 371.00 $ 1,105.00 320 4009 LIGHT TOWER,8-15KW VERT MAST $ 129.00 $ 376.00 $ 1,127.00 320 4010 LIGHT TOWER WITH 16-20KW GENERATOR $ 324.00 $ 836.00 $ 2,006.00 320 4011 LIGHT TOWER VERTICAL MAST W/16-20KW GEN $ 227.00 $ 750.00 $ 2,248.00 320 4050 LIGHT TOWER TOWABLE SOLAR POWER $ 191.00 $ 435.00 $ 1,330.00 320 4060 LIGHT TOWER ELECTRIC PUSHAROUND $ 102.00 $ 251.00 $ 610.00 330 6001 DOLLY APPLIANCE WITH STRAP $ 24.00 $ 74.00 $ 143.00 330 6040 DOLLY STAIR CLIMBING $ 190.00 $ 420.00 $ 1,001.00 330 6150 MACHINE SKATE SET 15 TON (4X3.75) $ 120.00 $ 267.00 $ 635.00 330 6560 JACK PALLET HYDRAULIC $ 60.00 $ 180.00 $ 413.00 330 6565 JACK PALLET 4,000# ELECTRIC $ 133.00 $ 320.00 $ 763.00 330 7113 LIFTING BRIDLE 4 LEG X 6' $ 23.00 $ 84.00 $ 188.00 #4..
- 289 -
330 7114 LIFTING BRIDLE 4 LEG X 8' $ 27.00 $ 85.00 $ 195.00 330 7115 LIFTING BRIDLE 4 LEG X 10' $ 27.00 $ 85.00 $ 195.00 330 7116 LIFTING BRIDLE 4 LEG X 12' $ 32.00 $ 94.00 $ 206.00 330 7117 LIFTING BRIDLE 4 LEG X 14' $ 34.00 $ 94.00 $ 222.00 330 7118 LIFTING BRIDLE 4 LEG X 16' $ 42.00 $ 103.00 $ 236.00 330 7112 LIFTING BRIDLE 4 LEG X 4' $ 19.00 $ 37.00 $ 93.00 330 7126 LIFTING BRIDLE 4 LEG X 10' ADJUSTABLE $ 22.00 $ 81.00 $ 235.00 330 7453 SLING WIRE 3/8" X 10' $ 30.00 $ 65.00 $ 158.00 330 9515 SHACKLE SCREW PIN 1" 8 1/2 TON $ 6.00 $ 22.00 $ 36.00 330 9635 GANTRY CRANE ALUMINUM 5 TON $ 469.00 $ 1,043.00 $ 2,484.00 330 9650 GANTRY CRANE ALUMINUM 3 TON $ 404.00 $ 941.00 $ 2,099.00 330 9670 GANTRY CRANE STEEL 10 TON $ 386.00 $ 884.00 $ 2,105.00 330 9678 GANTRY CRANE ALUMINUM 2 TON 8' $ 204.00 $ 454.00 $ 1,081.00 330 9680 GANTRY CRANE ALUMINUM 2 TON 10' $ 186.00 $ 412.00 $ 982.00 330 9685 GANTRY CRANE ALUMINUM 2 TON 15' $ 192.00 $ 436.00 $ 1,017.00 330 9712 LIFT MATERIAL 6-12' 0-400# MANUA $ 78.00 $ 177.00 $ 412.00 330 9713 LIFT MATERIAL 6-12' 400-700# MANUAL $ 78.00 $ 232.00 $ 519.00 330 9714 LIFT MATERIAL 6-12' 700-1000# MANUAL $ 87.00 $ 244.00 $ 514.00 330 9717 LIFT MATERIAL 13-15' 700-1000# MANUAL $ 92.00 $ 244.00 $ 580.00 330 9719 LIFT MATERIAL 16-18' 400-650# MANUAL $ 104.00 $ 246.00 $ 585.00 330 9723 LIFT MATERIAL 19-20' 700-800# MANUAL $ 104.00 $ 250.00 $ 587.00 330 9727 LIFT MATERIAL 24-25' 400-650# MANUAL $ 117.00 $ 296.00 $ 669.00 330 9735 FORK EXT FOR MATERIAL LIFT SET OF 2 $ 9.00 $ 25.00 $ 51.00 330 9800 PALLET JACK (BULK) $ 57.00 $ 171.00 $ 413.00
350 1 PRESSURE WASHER 4000 PSI $ 135.00 $ 410.00 $ 852.00 350 2350 PAINT SPRAYER .5-.75 GPM AIRLESS $ 91.00 $ 264.00 $ 747.00 350 3025 PRESSURE WASHER HOT ELECTRIC $ 156.00 $ 446.00 $ 998.00 350 3050 PRESSURE WASHER HOT GAS $ 174.00 $ 520.00 $ 1,156.00 350 3175 PRESSURE WASHER GAS 2500 PSI $ 112.00 $ 270.00 $ 682.00 350 3177 PRESSURE WASHER GAS 2700 PSI $ 116.00 $ 286.00 $ 709.00 350 3200 PRESSURE WASHER GAS 3000 PSI $ 123.00 $ 335.00 $ 835.00 350 3210 PRESSURE WASHER 3000 PSI ON TRAILER $ 304.00 $ 992.00 $ 2,239.00 350 3215 PRESSURE WASHER 3500 PSI ON TRAILER $ 328.00 $ 1,076.00 $ 2,519.00 350 3220 PRESSURE WASHER GAS 3500 PSI $ 128.00 $ 320.00 $ 797.00 350 3224 PRESSURE WASHER 5000 PSI $ 108.00 $ 429.00 $ 1,262.00 350 3250 PRESSURE WASHER HOSE 50' EXTENSION $ 17.00 $ 39.00 $ 68.00 350 3300 PRESSURE WASHER HYDRO SCRUBBER $ 44.00 $ 136.00 $ 288.00 375 525 FENCE MODULAR 12' L X 6' H TEMPORARY PANEL $ 54.00 $ 54.00 $ 54.00 375 6415 RISER LEG $ 37.00 $ 37.00 $ 37.00
500 76 PIPE FREEZING UNIT $ 140.00 $ 313.00 $ 745.00
500 98 PIPE PULLER $ 255.00 $ 647.00 $ 1,936.00
500 814 MANDREL FRAME 8"-12/15" $ 42.00 $ 56.00 $ 256.00 500 815 MANDREL FRAME 18"-27" $ 25.00 $ 64.00 $ 162.00
500 820 MANDREL 6" 5% $ 52.00 $ 175.00 $ 394.00
500 826 MANDREL 6" 7.5% $ 7.00 $ 18.00 $ 43.00
500 830 MANDREL 8" 5% $ 54.00 $ 183.00 $ 401.00
500 836 MANDREL 10" 5% $ 67.00 $ 198.00 $ 416.00
500 844 MANDREL 12" 5% $ 68.00 $ 213.00 $ 421.00
500 848 MANDREL 15" 5% $ 68.00 $ 216.00 $ 456.00
500 853 MANDREL 18" 5% $ 147.00 $ 362.00 $ 905.00
500 863 MANDREL 24" 5% $ 139.00 $ 344.00 $ 861.00
500 880 PIPE FUSION MACHINE 1/2"-2" $ 74.00 $ 166.00 $ 472.00 500 882 PIPE FUSION MACHINE 2" - 8" $ 275.00 $ 674.00 $ 1,501.00 500 883 PIPE FUSION MACHINE 1"-4" $ 162.00 $ 343.00 $ 857.00 500 884 PIPE FUSION MACHINE 2" - 6" $ 204.00 $ 452.00 $ 1,077.00 500 885 PIPE FUSION MACHINE 6" - 18" TRACK $ 1,031.00 $ 2,360.00 $ 5,617.00 500 886 PIPE FUSION MACHINE 6" - 18" ROLLING $ 892.00 $ 2,075.00 $ 4,850.00 500 887 PIPE FUSION MACHINE 4" - 12" ROLLING $ 493.00 $ 1,097.00 $ 2,612.00 500 888 PIPE FUSION MACHINE 4" - 12" TRACK $ 625.00 $ 1,455.00 $ 3,307.00 500 1175 PIPE CUTTER HINGED 4"-6" $ 42.00 $ 95.00 $ 238.00 500 1186 PIPE CUTTER HINGED 8"-12" $ 88.00 $ 199.00 $ 505.00 500 1196 PIPE CUTTER ROTARY 10"-14" $ 116.00 $ 292.00 $ 697.00 #4..
- 290 -
500 1351 PIPE WRENCH 48" BULK $ 17.00 $ 35.00 $ 84.00
500 1355 PIPE WRENCH 60" $ 21.00 $ 49.00 $ 117.00
500 1510 PIPE THREADER 700 HANDHELD ELECTRIC $ 56.00 $ 126.00 $ 299.00 500 1512 PIPE THREADER 1/2"-2" 535 POWERED $ 115.00 $ 293.00 $ 717.00 500 1515 PIPE THREADER 1/2"-2" 300 POWERED $ 115.00 $ 309.00 $ 760.00 500 1527 PIPE THREADER 1/2"-4" 1224 POWERED $ 188.00 $ 471.00 $ 1,177.00 500 1682 PLUG HOSE ROPE 20' $ 13.00 $ 48.00 $ 219.00
500 1685 PLUG HOSE ROPE 20' WITH GAUGE $ 18.00 $ 38.00 $ 91.00 500 1687 PLUG HOSE 20' READ BACK $ 15.00 $ 34.00 $ 100.00 500 1703 PLUG BACK/BLOCK 4" - 8" $ 17.00 $ 43.00 $ 106.00 500 1760 TEST PLUGS INFLATABLE 8"-12" $ 22.00 $ 54.00 $ 297.00 500 1820 PIPE JACK STAND $ 9.00 $ 21.00 $ 49.00
500 2072 SEWER CAMERA WITH 125' CABLE $ 138.00 $ 437.00 $ 1,321.00 500 2073 SEWER CAMERA WITH 200' CABLE $ 146.00 $ 435.00 $ 1,306.00 500 3072 SNAKE POWER 1/2" X 50' ELECTRIC $ 59.00 $ 157.00 $ 368.00 500 3095 SNAKE POWER 3/4" X 100' ELECTRIC $ 90.00 $ 261.00 $ 555.00 500 4015 SNAKE POWER 5/8" X 100' ELECTRIC $ 86.00 $ 259.00 $ 551.00 500 4200 PLUG BACK/BLOCK 12"-24" W/RV & SLEEVE $ 178.00 $ 457.00 $ 1,352.00 500 4205 12"-24" PLUG W/4" BYPASS W/RV & SLEEVE $ 86.00 $ 212.00 $ 529.00 500 4300 PLUG BACK/BLOCK 24"-48" W/RV & SLEEVE $ 340.00 $ 845.00 $ 2,123.00 500 7587 PLUG MECHANICAL 2" $ 4.00 $ 22.00 $ 77.00
500 7588 PLUG MECHANICAL 3" $ 5.00 $ 24.00 $ 83.00
500 7589 PLUG MECHANICAL 4" $ 17.00 $ 47.00 $ 139.00
500 7591 PLUG MECHANICAL 6" $ 17.00 $ 60.00 $ 177.00
500 7596 PLUG MECHANICAL 8" $ 16.00 $ 57.00 $ 168.00
500 7597 PLUG MECHANICAL 10" $ 27.00 $ 70.00 $ 205.00
500 7599 PLUG MECHANICAL 12" $ 23.00 $ 66.00 $ 197.00
500 7907 PLUG BACK/BLOCK 4"-6" $ 17.00 $ 43.00 $ 169.00 500 7908 PLUG BACK/BLOCK 6" - 10" $ 45.00 $ 115.00 $ 343.00 500 7910 PLUG BACK/BLOCK 6" - 12" $ 45.00 $ 108.00 $ 269.00 500 7911 PLUG BACK/BLOCK 8" - 12" $ 46.00 $ 153.00 $ 348.00 500 7914 PLUG BACK/BLOCK 12" - 18" $ 121.00 $ 395.00 $ 1,129.00 500 7915 PLUG BACK/BLOCK 4" $ 15.00 $ 33.00 $ 82.00
500 7917 PLUG BACK/BLOCK 6" $ 15.00 $ 33.00 $ 82.00
500 7919 PLUG BACK/BLOCK 8" $ 21.00 $ 49.00 $ 122.00
500 8130 PLUG TEST 36" $ 127.00 $ 429.00 $ 951.00
500 8152 LIFT LINE 20' $ 6.00 $ 25.00 $ 76.00
500 8154 LIFT LINE 30' $ 15.00 $ 35.00 $ 73.00
500 8260 PLUG TEST/FRONT 12"-24" W/RV & SLEEVE $ 110.00 $ 245.00 $ 687.00 500 8280 PLUG TEST/FRONT 15"-30/32" W/RV & SLEEVE $ 129.00 $ 370.00 $ 1,016.00 500 8300 PLUG TEST/FRONT 24"-48" W/RV & SLEEVE $ 201.00 $ 492.00 $ 1,320.00 500 8305 PLUG TEST/FRONT 36"-60" W/RV & SLEEVE $ 341.00 $ 1,144.00 $ 3,667.00 500 8315 PLUG FLOW THRU 4"-8" $ 47.00 $ 84.00 $ 235.00
500 8321 PLUG FLOW THRU 6"-10" $ 101.00 $ 230.00 $ 663.00 500 8335 PLUG FLOW THRU 8"-12"/4" $ 103.00 $ 244.00 $ 731.00 500 8352 PLUG FLOW THRU 10"-16" $ 30.00 $ 78.00 $ 466.00 500 8360 PLUG FLOW THRU 12"-18"/4" $ 40.00 $ 93.00 $ 424.00 500 8361 PLUG FLOW THRU 12"-18" $ 157.00 $ 448.00 $ 1,343.00 500 8370 PLUG FLOW THRU 15"-30"/4" $ 109.00 $ 293.00 $ 802.00 500 8380 PLUG FLOW THRU 24"-48"/4" $ 320.00 $ 813.00 $ 2,165.00 500 8535 PLUG AIR TEST PANEL $ 81.00 $ 202.00 $ 508.00
500 8637 PLUG LOCATER 12" X 24" REAR $ 94.00 $ 237.00 $ 1,407.00 500 8662 PLUG BACK/BLOCK 20"-36" W/RV & SLEEVE $ 243.00 $ 592.00 $ 1,773.00 500 8726 CLEANING BALL 6"-10" $ 23.00 $ 68.00 $ 192.00
500 8769 LINE STRING FAN $ 122.00 $ 301.00 $ 748.00
500 8770 HAND PUMP WITH GAUGE $ 10.00 $ 29.00 $ 88.00
500 8771 CHUTE LINE STRING 8"-12" $ 16.00 $ 33.00 $ 81.00 500 8772 CHUTE LINE STRING 15"-24" $ 21.00 $ 48.00 $ 121.00 500 8774 ROPE & REEL 1/4" X 500' $ 19.00 $ 59.00 $ 174.00 500 8776 ROPE & REEL 3/8" X 500' $ 22.00 $ 56.00 $ 140.00 500 8778 TRIPLE HOSE 50' $ 80.00 $ 216.00 $ 540.00
500 8806 PLUG TEST/FRONT 4" - 6" $ 20.00 $ 43.00 $ 114.00 #4..
- 291 -
500 8807 PLUG TEST/FRONT 6" - 12" $ 30.00 $ 70.00 $ 174.00 500 8808 PLUG TEST 6"-10" $ 49.00 $ 128.00 $ 309.00
500 8809 PLUG TEST 8"-12" $ 51.00 $ 132.00 $ 318.00
500 8810 PLUG TEST/FRONT 10" - 16" $ 36.00 $ 142.00 $ 507.00 500 8812 PLUG TEST 12"-18" $ 106.00 $ 263.00 $ 653.00
500 8815 PLUG TEST 15"-30" $ 140.00 $ 348.00 $ 866.00
500 8817 PLUG TEST/FRONT 20" - 36" W/RV & SLEEVE $ 314.00 $ 904.00 $ 2,721.00 500 8820 PLUG TEST 20"-36" $ 142.00 $ 354.00 $ 881.00
500 8824 PLUG TEST 24"-48" $ 150.00 $ 684.00 $ 1,736.00 500 8836 PLUG TEST 48"-72" $ 476.00 $ 1,184.00 $ 2,960.00 500 9000 VACUUM PUMP $ 91.00 $ 227.00 $ 554.00
500 9001 AIR N VAC VACUUM TESTER $ 66.00 $ 171.00 $ 465.00 500 9012 PLUG TEST VACUUM 30"-36" $ 167.00 $ 414.00 $ 1,028.00 500 9019 HOSE TRIPLE TEST 25' $ 16.00 $ 40.00 $ 106.00
500 9024 PANEL PORTABLE AIR-LOC CONTROL $ 153.00 $ 360.00 $ 912.00 500 9027 ROPE 30' INFLATION HOSE WITH GAUGE $ 10.00 $ 28.00 $ 70.00 500 9150 AIR TEST PANEL $ 177.00 $ 423.00 $ 993.00
500 9525 PLUG MUNI-BALL 12"-24" $ 121.00 $ 296.00 $ 711.00 500 9576 PLUG PIPE MULTI SIZE 20"-40" $ 147.00 $ 360.00 $ 897.00 500 9599 PLUG TEST/FRONT 24-60" W/ RV & SLEEVE $ 273.00 $ 680.00 $ 1,701.00 520 1001 PUMP 4" SELF PRIME - DIESEL $ 205.00 $ 639.00 $ 1,918.00 520 1002 PUMP 4" VENTURI PRIME - DIESEL $ 217.00 $ 559.00 $ 1,381.00 520 1003 PUMP 4" VAC ASSIST - DIESEL $ 205.00 $ 594.00 $ 1,826.00 520 1005 PUMP 4" DBA-SILENCER VAC ASSIST - DIESEL $ 239.00 $ 739.00 $ 2,055.00 520 1008 PUMP 4" DBA-TMSN JSV (OVT) PRIME HH - DI $ 302.00 $ 835.00 $ 2,451.00 520 1020 PUMP 4" SELF PRIME - ELECTRIC $ 233.00 $ 716.00 $ 2,224.00 520 1022 MODEL 4JC PUMP 4" VAC ASSIST - ELECTRIC $ 243.00 $ 728.00 $ 2,185.00 520 1026 MODEL 4TSV PUMP 4" TMSN JSV (OVT) PRIME HH $ 265.00 $ 795.00 $ 2,384.00 520 2 PUMP 3" VENTURI PRIME - DIESEL $ 166.00 $ 497.00 $ 1,490.00 520 20 PUMP 3" SELF PRIME - ELECTRIC $ 223.00 $ 661.00 $ 2,113.00 520 2001 PUMP 6" SELF PRIME - DIESEL $ 217.00 $ 685.00 $ 2,055.00 520 2002 PUMP 6" VENTURI PRIME - DIESEL $ 319.00 $ 848.00 $ 2,045.00 520 2003 PUMP 6" VAC ASSIST - DIESEL $ 239.00 $ 704.00 $ 2,113.00 520 2005 PUMP 6" DBA-SILENCER VAC ASSIST - DIESEL $ 282.00 $ 913.00 $ 2,625.00 520 2008 PUMP 6" SUPER VAC ASSIST - DIESEL $ 287.00 $ 857.00 $ 2,511.00 520 2014 PUMP 6" SS VAC ASSIST - DIESEL $ 781.00 $ 1,567.00 $ 4,873.00 520 2017 PUMP 6" SS SUPER VAC ASSIST - DIESEL $ 908.00 $ 1,804.00 $ 5,614.00 520 2021 PUMP 6" VENTURI PRIME - ELECTRIC $ 515.00 $ 1,043.00 $ 3,247.00 520 2022 PUMP 6" VAC ASSIST - ELECTRIC $ 246.00 $ 731.00 $ 2,192.00 520 2028 PUMP 6" SUPER VAC ASSIST - ELECTRIC $ 287.00 $ 861.00 $ 2,536.00 520 2029 PUMP 6" DBA-TMSN JSC ENV PRIME HH - DIES $ 494.00 $ 984.00 $ 2,474.00 520 2036 MODEL 6JB HAND PUMP 6" TMSN J HAND PRIME JET $ 326.00 $ 977.00 $ 2,930.00 520 2041 PUMP 6" TMSN JSC ENV PRIME OT - DIESEL $ 302.00 $ 775.00 $ 2,245.00 520 2043 PUMP 6" TMSN JSC ENV PRIME HH - DIESEL $ 302.00 $ 821.00 $ 2,385.00 520 2046 PUMP 6" TMSN JSV (OVT) PRIME OT - DIESEL $ 269.00 $ 695.00 $ 1,944.00 520 2047 PUMP 6" TMSN JSV (OVT) PRIME HH - DIESEL $ 246.00 $ 649.00 $ 1,846.00 520 3002 PUMP 8" VENTURI PRIME - DIESEL $ 526.00 $ 1,122.00 $ 3,252.00 520 3005 PUMP 8" DBA-SILENCER VAC ASSIST - DIESEL $ 353.00 $ 1,058.00 $ 3,175.00 520 3006 PUMP 8" DBA-VAC ASSIST CUTTER - DIESEL $ 354.00 $ 1,063.00 $ 3,187.00 520 3007 PUMP 8" SUPER VENTURI PRIME - DIESEL $ 475.00 $ 1,132.00 $ 3,521.00 520 3008 PUMP 8" SUPER VAC ASSIST - DIESEL $ 458.00 $ 1,346.00 $ 3,869.00 520 3009 PUMP 8" DBA-SILENCER SUPER VACASSIST-DSL $ 478.00 $ 1,343.00 $ 4,030.00 520 3011 PUMP 8" DBA-TMSN JSC ENV PRIME HH - DIES $ 399.00 $ 985.00 $ 2,758.00 520 3018 PUMP 8" TMSN JSC ENV PRIME HH - DIESEL $ 404.00 $ 1,017.00 $ 2,841.00 520 3022 MODEL 8JC PUMP 8" VAC ASSIST - ELECTRIC $ 386.00 $ 1,159.00 $ 3,476.00 520 3028 PUMP 8" SUPER VAC ASSIST - ELECTRIC $ 458.00 $ 1,346.00 $ 3,869.00 520 4000 PUMP 12" TMSN JSC ENV PRIME HH - DIESEL $ 628.00 $ 1,709.00 $ 4,431.00 520 4001 PUMP 12" DBA-TMSN JSC ENV PRIME HH - DIE $ 655.00 $ 1,766.00 $ 4,986.00 520 4005 PUMP 12" DBA-SILENCER VAC ASSIST - DSL $ 1,049.00 $ 2,408.00 $ 7,494.00 520 4007 PUMP 12" DBA-VAC ASSIST CUTTER - DIESEL $ 935.00 $ 1,833.00 $ 5,709.00 520 4008 PUMP 12" SUPERVAC ASSIST - DIESEL $ 1,136.00 $ 1,729.00 $ 5,136.00 520 4009 PUMP 12"DBA-SILNCER SUPER VAC ASSIST-DSL $ 1,198.00 $ 1,845.00 $ 5,635.00 #4..
- 292 -
520 4026 PUMP 12" DBA-TMSN ROTARY WELLPOINT - DIE $ 366.00 $ 1,143.00 $ 2,930.00 520 4027 MODEL 12JS PUMP 12" TMSN JSV (OVT) PRIME HH $ 552.00 $ 1,655.00 $ 4,966.00 520 5003 PUMP 14" VAC ASSIST - DIESEL $ 1,256.00 $ 1,845.00 $ 5,725.00 520 6000 MODEL 18JS PUMP 18" TMSN JSC ENV PRIME HH $ 1,250.00 $ 3,752.00 $ 11,256.00 520 6001 PUMP 18" DBA-TMSN JSC ENV PRIME HH - DIE $ 866.00 $ 2,342.00 $ 6,513.00 520 6002 PUMP 18" TMSN JSV (OVT) PRIME HH - DIESE $ 1,165.00 $ 2,750.00 $ 7,558.00 520 6005 PUMP 18" DBA-SILENCER VAC ASSIST - DSL $ 3,348.00 $ 3,826.00 $ 11,128.00 520 6008 PUMP 18" SUPER VAC ASSIST - DIESEL $ 3,138.00 $ 3,460.00 $ 10,272.00 520 6022 PUMP 18" SUPER VAC ASSIST - ELECTRIC $ 2,183.00 $ 4,282.00 $ 13,325.00 520 8022 PUMP 3X2 VAC ASSIST - ELECTRIC $ 593.00 $ 1,163.00 $ 3,621.00 520 8120 PUMP 4X2 STANDARD CENTRIFUGAL - ELECTRIC $ 1,023.00 $ 1,970.00 $ 6,130.00 520 8207 PUMP 4X3 SUPER VENTURI PRIME - DIESEL $ 1,100.00 $ 2,151.00 $ 6,750.00 520 8208 PUMP 4X3 SUPER VAC ASSIST - DIESEL $ 1,186.00 $ 2,173.00 $ 6,818.00 520 8303 PUMP 5X3 VAC ASSIST - DIESEL $ 323.00 $ 907.00 $ 2,773.00 520 8402 PUMP 6X3 VENTURI PRIME - DIESEL $ 668.00 $ 1,454.00 $ 4,444.00 520 8403 PUMP 6X3 VAC ASSIST - DIESEL $ 423.00 $ 1,291.00 $ 3,804.00 520 8414 PUMP 6X3 SS VAC ASSIST - DIESEL $ 668.00 $ 1,640.00 $ 4,091.00 520 8432 PUMP 6X3 VENTURI PRIME-DSL/180G FUELSKID $ 992.00 $ 1,941.00 $ 5,947.00 520 8501 PUMP 6X4 SUPER VENTURI PRIME - DIESEL $ 1,202.00 $ 2,602.00 $ 8,022.00 520 8503 PUMP 6X4 VAC ASSIST - DIESEL $ 800.00 $ 1,811.00 $ 5,860.00 520 8508 PUMP 6X4 SUPER VAC ASSIST - DIESEL $ 1,145.00 $ 2,607.00 $ 7,452.00 520 8509 PUMP 6X4 DBA-SILNCER SUPER VACASSIST-DSL $ 658.00 $ 1,878.00 $ 5,393.00 520 8602 PUMP 8X6 VENTURI PRIME - DIESEL $ 626.00 $ 1,706.00 $ 4,104.00 520 8603 PUMP 8X6 VAC ASSIST - DIESEL $ 838.00 $ 2,208.00 $ 5,408.00 520 8607 PUMP 8X6 SUPER VENTURI PRIME - DIESEL $ 1,651.00 $ 3,748.00 $ 11,479.00 520 8608 PUMP 8X6 SUPER VAC ASSIST - DIESEL $ 1,076.00 $ 3,169.00 $ 9,244.00 520 8609 PUMP 8X6 DBA-SILNCER SUPER VACASSIST-DSL $ 1,291.00 $ 3,653.00 $ 10,615.00 520 8702 PUMP 10X8 VENTURI PRIME - DIESEL $ 746.00 $ 1,559.00 $ 4,445.00 520 8703 PUMP 10X8 VAC ASSIST - DIESEL $ 897.00 $ 2,642.00 $ 7,704.00 520 8704 PUMP 10X8 DBA-SILENCER VENTURI PRIME-DSL $ 1,637.00 $ 3,477.00 $ 10,821.00 520 8705 PUMP 10X8 DBA-SILENCER VAC ASSIST-DIESEL $ 1,369.00 $ 3,766.00 $ 10,729.00 520 8708 PUMP 10X8 SUPER VAC ASSIST - DIESEL $ 979.00 $ 3,081.00 $ 9,244.00 520 8714 PUMP 10X8 SS VAC ASSIST - DIESEL $ 1,798.00 $ 3,692.00 $ 10,959.00 520 8722 PUMP 10X8 VAC ASSIST - ELECTRIC $ 1,584.00 $ 3,148.00 $ 9,700.00 520 8903 PUMP 12X8 VAC ASSIST - DIESEL $ 2,204.00 $ 4,105.00 $ 12,775.00 520 9020 PUMP 1" TO 1.5" AOD - ALUMINUM $ 92.00 $ 286.00 $ 856.00 520 9022 PUMP 1" TO 1.5" AOD - STAINLESS $ 108.00 $ 308.00 $ 925.00 520 9023 PUMP 1" TO 1.5" AOD - POLY $ 102.00 $ 308.00 $ 916.00 520 9030 PUMP 2" AOD - ALUMINUM $ 100.00 $ 294.00 $ 856.00 520 9031 PUMP 2" AOD - CAST IRON $ 105.00 $ 253.00 $ 654.00 520 9032 PUMP 2" AOD - STAINLESS $ 103.00 $ 308.00 $ 925.00 520 9033 PUMP 2" AOD - POLY $ 106.00 $ 308.00 $ 925.00
520 9040 PUMP 3" AOD - ALUMINUM $ 98.00 $ 308.00 $ 925.00 520 9042 PUMP 3" AOD - STAINLESS $ 154.00 $ 462.00 $ 1,387.00 520 9043 PUMP 3" AOD - POLY $ 290.00 $ 578.00 $ 1,801.00 520 9130 PUMP 2" DEWATERING $ 47.00 $ 113.00 $ 342.00
520 9136 PUMP 2" DIAPHRAGM ELECTRIC $ 47.00 $ 113.00 $ 342.00 520 9140 PUMP 3" DEWATERING $ 55.00 $ 167.00 $ 513.00
520 9145 PUMP 3" DIAPHRAGM $ 89.00 $ 252.00 $ 548.00
520 9230 PUMP 2" TRASH $ 47.00 $ 113.00 $ 342.00
520 9240 PUMP 3" TRASH $ 55.00 $ 167.00 $ 499.00
520 9250 PUMP 4" TRASH $ 72.00 $ 215.00 $ 633.00
520 9400 PUMP 4" SLUDGEMASTER (TRAILER MOUNTED) $ 1,076.00 $ 3,169.00 $ 9,685.00 520 9541 3" HYDRAULIC PUMP HEAD - CAST IRON $ 163.00 $ 444.00 $ 977.00 520 9550 4" HYDRAULIC PUMP HEAD - VORTEX $ 203.00 $ 387.00 $ 1,205.00 520 9551 4" HYDRAULIC PUMP HEAD - CAST IRON $ 103.00 $ 306.00 $ 916.00 520 9552 4" HYDRAULIC PUMP HEAD - STAINLESS $ 103.00 $ 306.00 $ 916.00 520 9554 4" HYDRAULIC PUMP HEAD - SLURRYGATE $ 102.00 $ 306.00 $ 916.00 520 9561 6" HYDRAULIC PUMP HEAD - CAST IRON $ 122.00 $ 366.00 $ 1,098.00 520 9564 6" HYDRAULIC PUMP HEAD - SLURRYGATE $ 117.00 $ 352.00 $ 1,056.00 520 9571 8" HYDRAULIC PUMP HEAD - CAST IRON $ 150.00 $ 449.00 $ 1,347.00 520 9573 8" TMSN HYDRAULIC PUMP HEAD - 80HST $ 212.00 $ 263.00 $ 849.00 #4..
- 293 -
520 9581 12" HYDRAULIC PUMP HEAD - CAST IRON $ 195.00 $ 605.00 $ 1,814.00 520 9650 6X5 DIESEL PUMP - MULTI STAGE HORIZONTAL $ 6,335.00 $ 14,610.00 $ 42,186.00 520 9701 8KW SUBMERSIBLE POWER UNIT $ 177.00 $ 471.00 $ 1,467.00 520 9702 20KW SUBMERSIBLE POWER UNIT $ 294.00 $ 713.00 $ 2,218.00 520 9706 25HP HYDRAULIC POWER UNIT $ 259.00 $ 704.00 $ 2,089.00 520 9707 10HP HYDRAULIC POWER UNIT $ 143.00 $ 455.00 $ 1,054.00 520 9708 65HP HYDRAULIC POWER UNIT $ 334.00 $ 836.00 $ 2,397.00 520 9709 150HP HYDRAULIC POWER UNIT $ 500.00 $ 957.00 $ 3,375.00 520 9714 74HP TMSN 32HPU HYDRAULIC POWER UNIT $ 180.00 $ 480.00 $ 1,345.00 520 9830 PUMP 2" ELECTRIC SUBMERSIBLE $ 58.00 $ 143.00 $ 359.00 520 9831 2" ELECTRIC SUBMERSIBLE TRASH $ 53.00 $ 159.00 $ 364.00 520 9840 PUMP 3" ELECTRIC SUBMERSIBLE $ 81.00 $ 218.00 $ 512.00 520 9850 PUMP 4" ELECTRIC SUBMERSIBLE $ 140.00 $ 348.00 $ 886.00 520 9852 PUMP 4" ELECTRIC SUBMERSIBLE RIG $ 137.00 $ 329.00 $ 1,026.00 520 9860 PUMP 6" ELECTRIC SUBMERSIBLE 15-30 HP $ 315.00 $ 792.00 $ 1,982.00 520 9861 PUMP 6" ELECTRIC SUBMERSIBLE 31-49HP $ 315.00 $ 763.00 $ 2,005.00 520 9862 PUMP 6" MANHOLE SUBMERSIBLE $ 156.00 $ 363.00 $ 1,497.00 520 9864 PUMP 6" ELECTRIC SUBMERSIBLE 50-60 HP $ 531.00 $ 1,149.00 $ 3,578.00 520 9870 PUMP 8" ELECTRIC SUBMERSIBLE $ 461.00 $ 1,132.00 $ 2,886.00 520 9880 PUMP 10" ELECTRIC SUBMERSIBLE $ 584.00 $ 1,460.00 $ 3,615.00 520 9912 MODEL 12R ROTARY PUMP 12" TMSN ROTARY WELLPOINT $ 364.00 $ 1,093.00 $ 3,278.00 520 9935 MODEL 8RW ROTARY PUMP 8" TMSN ROTARY WELLPOINT $ 320.00 $ 960.00 $ 2,880.00 520 9946 PUMP 8" DBA-TMSN ROTARY WELLPOINT - DIES $ 321.00 $ 849.00 $ 2,441.00 520 9948 PUMP 8" ROTARY WELLPOINT - ELECTRIC $ 371.00 $ 707.00 $ 2,202.00 520 9949 PUMP 8" ROTARY DBA-WELLPOINT DIESEL $ 445.00 $ 846.00 $ 2,639.00 520 9950 PUMP 8" ROTARY WELLPOINT - DIESEL $ 479.00 $ 974.00 $ 3,088.00 520 9951 PUMP 6" PISTON DBA-WELLPOINT - DIESEL $ 376.00 $ 859.00 $ 2,672.00 520 9952 PUMP 8" PISTON DBA-WELLPOINT - DIESEL $ 476.00 $ 1,072.00 $ 3,399.00 520 9998 PUMP 4" DOUBLE DIAPHRAGM - DIESEL $ 125.00 $ 373.00 $ 1,119.00 523 1000 AUTO DIAL MONITOR SYSTEM $ 125.00 $ 244.00 $ 758.00 523 1010 WIRELESS TELEMETRY MESSENGER SYSTEM $ 125.00 $ 244.00 $ 759.00 523 1101 PROP FLOW METERS ALL SIZES $ 237.00 $ 460.00 $ 1,429.00 523 1407 GATE VALVE 6" AND UNDER STAINLESS STEEL $ 25.00 $ 48.00 $ 205.00 523 1408 GATE VALVE 8" $ 46.00 $ 95.00 $ 297.00
523 1804 VALVE BUTTERFLY 4" $ 20.00 $ 30.00 $ 92.00
523 1806 VALVE BUTTERFLY 6" $ 27.00 $ 43.00 $ 133.00
523 2001 STANDALONE PUMP MANIFOLD $ 871.00 $ 1,861.00 $ 5,795.00 523 3001 SUBMERSIBLE PUMP CONTROL PANEL $ 35.00 $ 69.00 $ 194.00 523 3005 PUMP CONTROL PANEL TRANSDUCER $ 47.00 $ 110.00 $ 291.00 523 3010 VFD PANEL - 60HP - 460V - NEMA 3R OR 4 $ 576.00 $ 1,265.00 $ 3,863.00 523 3016 VFD PANEL - 350HP - 460V - NEMA 3R OR 4 $ 1,445.00 $ 3,169.00 $ 9,421.00 523 3017 VFD PANEL - 400HP - 460V - NEMA 3R OR 4 $ 1,404.00 $ 3,021.00 $ 9,407.00 534 2020 HOSE 2X20 PVC SUCTION - CAMLOCK $ 13.00 $ 44.00 $ 126.00 534 2110 HOSE 2X20 STAINLESS - FLANGED $ 31.00 $ 94.00 $ 284.00 534 2311 HOSE 2X20 CHEMICAL - FLANGED (SS) $ 29.00 $ 88.00 $ 263.00 534 2321 HOSE 2X20 CHEMICAL - CAMLOCK (SS) $ 29.00 $ 88.00 $ 246.00 534 2720 HOSE 2X20 TANK TRUCK - CAMLOCK $ 22.00 $ 69.00 $ 206.00 534 2920 HOSE 2X20 RUBBER SUCTION - CAMLOCK $ 15.00 $ 44.00 $ 131.00 534 5820 HOSE 2X50 RUBBER DISCHARGE - CAMLOCK $ 17.00 $ 49.00 $ 148.00 534 6620 HOSE 2X50 LAYFLAT DISCHARGE - CAMLOCK $ 15.00 $ 44.00 $ 122.00 534 6680 HOSE 2X50 LAYFLAT DISCHARGE - NPT $ 12.00 $ 37.00 $ 72.00 535 2020 HOSE 3X20 PVC SUCTION - CAMLOCK $ 18.00 $ 54.00 $ 163.00 535 2110 HOSE 3X20 STAINLESS - FLANGED $ 44.00 $ 131.00 $ 394.00 535 2220 HOSE 3X20 KANAFLEX SUCTION - CAMLOCK $ 16.00 $ 44.00 $ 124.00 535 2311 HOSE 3X20 CHEMICAL - FLANGED (SS) $ 36.00 $ 108.00 $ 325.00 535 2321 HOSE 3X20 CHEMICAL - CAMLOCK (SS) $ 39.00 $ 117.00 $ 328.00 535 2410 HOSE 3X20 OSD - FLANGED $ 39.00 $ 117.00 $ 335.00 535 2720 HOSE 3X20 TANK TRUCK - CAMLOCK $ 43.00 $ 101.00 $ 272.00 535 2920 HOSE 3X20 RUBBER SUCTION - CAMLOCK $ 19.00 $ 58.00 $ 164.00 535 3920 HOSE 3X25 RUBBER SUCTION - CAMLOCK $ 12.00 $ 35.00 $ 82.00 535 6620 HOSE 3X50 LAYFLAT DISCHARGE - CAMLOCK $ 19.00 $ 58.00 $ 175.00 535 6680 HOSE 3X50 LAYFLAT DISCHARGE - NPT $ 16.00 $ 39.00 $ 93.00 #4..
- 294 -
535 6820 HOSE 3X50 RUBBER DISCHARGE - CAMLOCK $ 22.00 $ 69.00 $ 204.00 536 1730 HOSE 4X10 TANK TRUCK - QC $ 8.00 $ 58.00 $ 125.00 536 1920 HOSE 4X10 RUBBER SUCTION - CAMLOCK $ 40.00 $ 81.00 $ 254.00 536 2020 HOSE 4X20 PVC SUCTION - CAMLOCK $ 27.00 $ 69.00 $ 207.00 536 2110 HOSE 4X20 STAINLESS - FLANGED $ 52.00 $ 154.00 $ 473.00 536 2220 HOSE 4X20 KANAFLEX SUCTION - CAMLOCK $ 21.00 $ 65.00 $ 197.00 536 2230 HOSE 4X20 KANAFLEX SUCTION - QC $ 21.00 $ 65.00 $ 197.00 536 2311 HOSE 4X20 CHEMICAL - FLANGED (SS) $ 48.00 $ 144.00 $ 418.00 536 2321 HOSE 4X20 CHEMICAL - CAMLOCK (SS) $ 48.00 $ 137.00 $ 410.00 536 2410 HOSE 4X20 OSD - FLANGED $ 48.00 $ 146.00 $ 438.00 536 2412 HOSE 4X20 COMPOSITE - FLANGED $ 48.00 $ 112.00 $ 318.00 536 2710 HOSE 4X20 TANK TRUCK - FLANGED $ 37.00 $ 110.00 $ 331.00 536 2720 HOSE 4X20 TANK TRUCK - CAMLOCK $ 45.00 $ 103.00 $ 288.00 536 2740 HOSE 4X20 TANK TRUCK - HAMMER $ 37.00 $ 110.00 $ 329.00 536 2860 HOSE 4X20 RUBBER SUCTION - VIC $ 13.00 $ 31.00 $ 108.00 536 2895 HOSE 4X20 COMPOSITE DISCHARGE $ 53.00 $ 108.00 $ 324.00 536 2920 HOSE 4X20 RUBBER SUCTION - CAMLOCK $ 27.00 $ 72.00 $ 215.00 536 2930 HOSE 4X20 RUBBER SUCTION - QC $ 12.00 $ 38.00 $ 116.00 536 3920 HOSE 4X25 BLACK WATER SUCTION - CAMLOCK $ 20.00 $ 52.00 $ 119.00 536 6620 HOSE 4X50 LAYFLAT DISCHARGE - CAMLOCK $ 25.00 $ 69.00 $ 219.00 536 6630 HOSE 4X50 LAYFLAT DISCHARGE - QC $ 13.00 $ 42.00 $ 126.00 536 6820 HOSE 4X50 RUBBER DISCHARGE - CAMLOCK $ 34.00 $ 74.00 $ 202.00 536 6830 HOSE 4X50 RUBBER DISCHARGE - QC $ 49.00 $ 95.00 $ 299.00 537 1410 HOSE 6X10 OSD - FLANGED $ 24.00 $ 46.00 $ 163.00 537 1920 HOSE 6X10 RUBBER SUCTION - CAMLOCK $ 27.00 $ 66.00 $ 134.00 537 2020 HOSE 6X20 PVC SUCTION - CAMLOCK $ 35.00 $ 81.00 $ 248.00 537 2110 HOSE 6X20 STAINLESS - FLANGED $ 70.00 $ 209.00 $ 628.00 537 2220 HOSE 6X20 KANAFLEX SUCTION - CAMLOCK $ 40.00 $ 94.00 $ 273.00 537 2230 HOSE 6X20 KANAFLEX SUCTION - QC $ 26.00 $ 76.00 $ 228.00 537 2311 HOSE 6X20 CHEMICAL - FLANGED (SS) $ 69.00 $ 207.00 $ 621.00 537 2313 HOSE 6X20 CHEMICAL - FLANGED (CS) $ 110.00 $ 215.00 $ 668.00 537 2405 HOSE 6X20 COMPOSITE OSD - FLANGED $ 109.00 $ 213.00 $ 665.00 537 2410 HOSE 6X20 OSD - FLANGED $ 55.00 $ 185.00 $ 500.00 537 2720 HOSE 6X20 TANK TRUCK - CAMLOCK $ 38.00 $ 113.00 $ 340.00 537 2730 HOSE 6X20 TANK TRUCK - BAUER $ 79.00 $ 161.00 $ 485.00 537 2910 HOSE 6X20 RUBBER SUCTION - FLANGED $ 43.00 $ 115.00 $ 312.00 537 2920 HOSE 6X20 RUBBER SUCTION - CAMLOCK $ 35.00 $ 86.00 $ 258.00 537 2921 HOSE 6X20 RUBBER SUCTION - CAMLOCK (SS) $ 60.00 $ 117.00 $ 363.00 537 2930 HOSE 6X20 RUBBER SUCTION - QC $ 53.00 $ 107.00 $ 330.00 537 2960 HOSE 6X20 RUBBER SUCTION - VIC $ 24.00 $ 45.00 $ 138.00 537 3920 HOSE 6X25 RUBBER SUCTION - CAMLOCK $ 34.00 $ 88.00 $ 213.00 537 6620 HOSE 6X50 LAYFLAT DISCHARGE - CAMLOCK $ 37.00 $ 97.00 $ 279.00 537 6630 HOSE 6X50 LAYFLAT DISCHARGE - QC $ 24.00 $ 72.00 $ 217.00 537 6820 HOSE 6X50 RUBBER DISCHARGE - CAMLOCK $ 44.00 $ 98.00 $ 256.00 537 6830 HOSE 6X50 RUBBER DISCHARGE - QC $ 31.00 $ 89.00 $ 264.00 538 1230 HOSE 8X10 KANAFLEX SUCTION - QC $ 55.00 $ 113.00 $ 324.00 538 1410 HOSE 8X10 OSD - FLANGED $ 48.00 $ 118.00 $ 349.00 538 2110 HOSE 8X20 STAINLESS - FLANGED $ 89.00 $ 273.00 $ 837.00 538 2220 HOSE 8X20 KANAFLEX SUCTION - CAMLOCK $ 44.00 $ 146.00 $ 407.00 538 2230 HOSE 8X20 KANAFLEX SUCTION - QC $ 40.00 $ 88.00 $ 246.00 538 2405 HOSE 8X20 COMPOSITE OSD - FLANGED $ 126.00 $ 248.00 $ 771.00 538 2410 HOSE 8X20 OSD - FLANGED $ 98.00 $ 292.00 $ 876.00 538 2720 HOSE 8X20 TANK TRUCK - CAMLOCK $ 63.00 $ 189.00 $ 565.00 538 2730 HOSE 8X20 TANK TRUCK - BAUER $ 64.00 $ 192.00 $ 577.00 538 2910 HOSE 8X20 RUBBER SUCTION - FLANGED $ 70.00 $ 139.00 $ 418.00 538 2920 HOSE 8X20 RUBBER SUCTION - CAMLO $ 45.00 $ 135.00 $ 401.00 538 2930 HOSE 8X20 RUBBER SUCTION - QC $ 39.00 $ 118.00 $ 353.00 538 2960 HOSE 8X20 RUBBER SUCTION - VIC $ 34.00 $ 75.00 $ 242.00 538 3830 HOSE 8X25 RUBBER DISCHARGE - BAUER $ 92.00 $ 183.00 $ 563.00 538 6620 HOSE 8X50 LAYFLAT DISCHARGE - CAMLOCK $ 31.00 $ 95.00 $ 288.00 538 6630 HOSE 8X50 LAYFLAT DISCHARGE - QC $ 45.00 $ 152.00 $ 449.00 538 6820 HOSE 8X50 RUBBER DISCHARGE - CAMLOCK $ 57.00 $ 173.00 $ 522.00 #4..
- 295 -
538 6830 HOSE 8X50 RUBBER DISCHARGE - QC $ 35.00 $ 104.00 $ 315.00 538 8001 REEL HOSE DEPLOYMENT SYSTEM $ 573.00 $ 1,109.00 $ 2,978.00 539 1110 HOSE 10 X 10 STAINLESS - FLANGED $ 160.00 $ 303.00 $ 946.00 539 1410 HOSE 10X10 OSD - FLANGED $ 90.00 $ 201.00 $ 577.00 539 2110 HOSE 10X20 STAINLESS - FLANGED $ 112.00 $ 336.00 $ 1,008.00 539 2410 HOSE 10X20 OSD - FLANGED $ 108.00 $ 337.00 $ 990.00 539 2960 HOSE 10X20 RUBBER SUCTION - VIC $ 61.00 $ 173.00 $ 571.00 539 6560 HOSE 10X50 RUBBER DISCHARGE - VICTAULIC $ 84.00 $ 185.00 $ 609.00 540 1930 HOSE 12X10 RUBBER SUCTION - QC $ 46.00 $ 137.00 $ 411.00 540 2230 HOSE 12X20 KANAFLEX SUCTION - QC $ 56.00 $ 167.00 $ 501.00 540 2410 HOSE 12X20 OSD - FLANGED $ 144.00 $ 418.00 $ 1,255.00 540 2910 HOSE 12X20 RUBBER SUCTION - FLANGED $ 135.00 $ 316.00 $ 970.00 540 3630 HOSE 12X25 LAYFLAT DISCHARGE - QC $ 116.00 $ 231.00 $ 889.00 540 4510 HOSE 12X30 OSD DISCHARGE - FLANGED $ 94.00 $ 284.00 $ 967.00 541 2410 HOSE 14X20 OSD - FLANGED $ 173.00 $ 445.00 $ 1,322.00 545 1010 10 X 10 CONTAINEMENT BERM $ 78.00 $ 173.00 $ 506.00 545 1012 10 X 12 CONTAINMENT BERM $ 81.00 $ 139.00 $ 331.00 545 1016 10 X 16 CONTAINMENT BERM $ 82.00 $ 182.00 $ 486.00 545 1021 10 X 25 CONTAINMENT BERM $ 31.00 $ 153.00 $ 610.00 545 1023 1 X 50 HYD HOSE $ 22.00 $ 69.00 $ 204.00
545 1034 1-1/4 X 50 HYDRAULIC HOSE $ 25.00 $ 73.00 $ 220.00 545 1050 10 X 50 CONTAINMENT BERM $ 58.00 $ 176.00 $ 528.00 545 1101 FLANGED REDUCERS (ALL SIZES) $ 16.00 $ 41.00 $ 140.00 545 1103 Y'S $ 29.00 $ 72.00 $ 174.00
545 1104 T'S $ 34.00 $ 79.00 $ 199.00
545 1105 STRAINERS (ALL SIZES) $ 3.00 $ 10.00 $ 34.00
545 1108 BUTTERFLY VALVES $ 15.00 $ 45.00 $ 134.00
545 1109 90'S $ 18.00 $ 47.00 $ 148.00
545 1113 GATE VALVE 6" AND UNDER $ 20.00 $ 60.00 $ 180.00 545 1140 SUCTION/DISCHARGE MANIFOLD $ 85.00 $ 112.00 $ 899.00 545 1142 4" VICTAULIC CLAMP $ 5.00 $ 7.00 $ 26.00
545 1143 3" VICTAULIC CLAMP $ 1.00 $ 1.00 $ 4.00
545 1182 8" VICTAULIC 90 $ 6.00 $ 11.00 $ 37.00
545 1185 8" VICTAULIC CLAMP $ 4.00 $ 9.00 $ 25.00
545 1195 6" VICTAULIC CLAMP $ 3.00 $ 16.00 $ 26.00
545 1212 12 X 12 CONTAINMENT BERM $ 56.00 $ 139.00 $ 372.00 545 1216 12 X 16 CONTAINMENT BERM $ 119.00 $ 260.00 $ 807.00 545 1225 12 X 25 CONTAINMENT BERM $ 84.00 $ 229.00 $ 507.00 545 1230 12 X 30 CONTAINMENT BERM $ 151.00 $ 297.00 $ 912.00 545 1250 12 X 50 CONTAINMENT BERM $ 78.00 $ 195.00 $ 458.00 545 1282 8X20 BAUER PIPE $ 12.00 $ 38.00 $ 115.00
545 1330 8" ROAD CROSSING $ 195.00 $ 429.00 $ 1,027.00
545 1331 8" ROAD CROSSING DOUBLE WIDE $ 192.00 $ 575.00 $ 1,726.00 545 1332 10" ROAD CROSSING $ 166.00 $ 498.00 $ 1,493.00 545 1334 12" ROAD CROSSING $ 131.00 $ 393.00 $ 1,469.00 545 1335 12" ROAD CROSSING DOUBLE WIDE $ 211.00 $ 633.00 $ 1,898.00 545 1340 10' BRIDGE STYLE ROAD CROSSING $ 155.00 $ 464.00 $ 1,393.00 545 1342 12' BRIDGE STYLE ROAD CROSSING $ 181.00 $ 498.00 $ 1,641.00 545 1345 15' BRIDGE STYLE ROAD CROSSING $ 398.00 $ 825.00 $ 1,885.00 545 1413 12X10 TYPE A BAUER PIPE $ 7.00 $ 19.00 $ 80.00 545 1570 6X20 WELLPOINT HEADER PIPE $ 17.00 $ 51.00 $ 151.00 545 2025 20 X 25 CONTAINMENT BERM $ 163.00 $ 363.00 $ 993.00 545 2054 50 X 50 CONTAINMNENT BERM $ 195.00 $ 586.00 $ 2,203.00 545 2260 6" WATER TREE $ 84.00 $ 254.00 $ 763.00
545 2397 8X20 HDPE DR17 QC $ 25.00 $ 52.00 $ 167.00
545 2405 4" HDPE PIPE DR17 $ 1.00 $ 3.00 $ 9.00
545 2408 8" HDPE PIPE DR17 $ 2.00 $ 3.00 $ 6.00
545 2412 12" HDPE PIPE DR17 $ 2.00 $ 3.00 $ 8.00
545 2421 18" HDPE FLG W/BACKUP RING $ 15.00 $ 28.00 $ 85.00 545 2432 18" HDPE PIPE DR26 $ 2.00 $ 6.00 $ 15.00
545 2469 12" FLANGE ADAPTER W/BACKUP RING $ 33.00 $ 64.00 $ 212.00 545 2485 24" HDPE TEE $ 12.00 $ 29.00 $ 589.00
#4..
- 296 -
545 2518 18" HDPE PIPE DR17 $ 3.00 $ 4.00 $ 11.00
545 606 6 X 6 CONTAINMENT BERM $ 21.00 $ 61.00 $ 147.00 545 6213 18 HDPE FLOATING TEE SUCTION $ 208.00 $ 408.00 $ 1,268.00 545 6240 24" HDPE PIPE DR17 $ 6.00 $ 7.00 $ 18.00
545 6241 24" TEE FLOAT HDPE $ 112.00 $ 338.00 $ 1,015.00 545 6490 4" QC 90 BEND $ 6.00 $ 12.00 $ 39.00
545 6601 6" QC FLG X SOCKET $ 6.00 $ 11.00 $ 36.00
545 6820 8 X 6 QC REDUCER $ 8.00 $ 20.00 $ 44.00
545 6821 8 X 6 FLANGED REDUCER $ 16.00 $ 31.00 $ 91.00
545 6901 FLOAT SWITCH $ 20.00 $ 51.00 $ 125.00
545 806 8 X 6 CONTAINMENT BERM $ 54.00 $ 142.00 $ 349.00 545 808 8 X 8 CONTAINMENT BERM $ 62.00 $ 136.00 $ 373.00 545 810 8 X 10 CONTAINMENT BERM $ 40.00 $ 95.00 $ 251.00 545 9001 MOBILE PIPE RACK $ 82.00 $ 161.00 $ 502.00
545 9215 FITTING 4" CAMLOCK $ 16.00 $ 24.00 $ 69.00
545 9365 FITTING 4" FEMALE CAMLOCK TO FLANGE $ 8.00 $ 15.00 $ 46.00 545 9385 FITTING 6" FEMALE CAMLOCK TO MALE NPT $ 11.00 $ 28.00 $ 72.00 545 9420 FITTING 4" BALL VALVE QC $ 17.00 $ 29.00 $ 92.00 545 9435 FITTING ELBOW 4" 90 DEGREES $ 18.00 $ 33.00 $ 101.00 545 9450 FITTING ELBOW 6" 90 DEGREES $ 16.00 $ 24.00 $ 73.00 545 9455 FITTING ELBOW 8" 90 DEGREES $ 21.00 $ 35.00 $ 113.00 545 9495 FITTING FLANGE 3" $ 24.00 $ 35.00 $ 107.00
545 9500 FITTING FLANGE 4" $ 10.00 $ 15.00 $ 46.00
545 9505 FITTING FLANGE 6" $ 10.00 $ 17.00 $ 47.00
545 9510 FITTING FLANGE 8" $ 11.00 $ 23.00 $ 53.00
545 9535 FITTING REDUCER 6" X 4" $ 9.00 $ 13.00 $ 54.00 545 9545 FITTING REDUCER 8" X 6" $ 17.00 $ 27.00 $ 83.00 545 9550 FITTING REDUCER 10" X 6" $ 18.00 $ 30.00 $ 91.00 545 9555 FITTING REDUCER 20" X 12" $ 71.00 $ 113.00 $ 365.00 545 9560 4" TEE $ 29.00 $ 48.00 $ 147.00
545 9610 GARDEN HOSE 50' $ 11.00 $ 26.00 $ 49.00
545 9820 PUMP HYDROSTATIC TEST 550 PSI GAS $ 98.00 $ 374.00 $ 790.00 545 9830 PUMP HYDROSTATIC TEST 10K PSI AIR $ 225.00 $ 498.00 $ 1,186.00 545 9953 UNIVERSAL MANIFOLD 4 WAY $ 126.00 $ 363.00 $ 1,130.00 545 9960 MANIFOLD 6" X 12" $ 343.00 $ 603.00 $ 1,739.00 550 6100 HANGING ACOUSTIC NOISE BARRIER 6.5' X 4' $ 15.00 $ 28.00 $ 62.00 550 7065 TRIPOD RESCUE KIT $ 116.00 $ 316.00 $ 752.00
550 7073 RETRIEVAL SYSTEM WINCH WITH 60' CABLE $ 102.00 $ 257.00 $ 629.00 550 7085 TRIPOD ALUMINUM RESCUE 5-7' UL $ 100.00 $ 400.00 $ 1,196.00 550 7116 LIFE LINE SELF RETRACTING 50' $ 60.00 $ 182.00 $ 540.00 550 7118 LIFE LINE RESCUER 50' $ 114.00 $ 341.00 $ 1,023.00 550 7119 LIFE LINE SELF RETRACTING 130' $ 60.00 $ 182.00 $ 540.00 550 8000 BIKE RACK - EVENT $ 20.00 $ 20.00 $ 20.00
550 8027 GAS DETECTOR 4 GAS W/INTEGRAL PUMP $ 84.00 $ 265.00 $ 656.00 550 8030 GAS DETECTOR 4 GAS $ 53.00 $ 184.00 $ 527.00
550 8201 KIT: TRENCH SHIELD DAVIT ARM SYSTEM $ 236.00 $ 646.00 $ 1,522.00 550 8202 KIT: MANHOLE GUARD DAVIT ARM SYSTEM $ 220.00 $ 556.00 $ 1,234.00 550 8206 KIT: VEHICLE HITCH DAVIT ARM SYSTEM $ 220.00 $ 556.00 $ 1,234.00 550 8227 MANHOLE GUARD DAVIT ARM $ 217.00 $ 214.00 $ 563.00 550 8229 DAVIT LOWER MAST EXTENSION 36" $ 210.00 $ 448.00 $ 687.00 550 8233 DAVIT ARM VEHICLE HITCH MOUNT $ 348.00 $ 1,037.00 $ 2,469.00 550 8234 TRENCH SHIELD DAVIT ARM BASE $ 50.00 $ 148.00 $ 341.00 550 8236 TRENCH SHIELD DAVIT ARM $ 190.00 $ 503.00 $ 1,198.00 551 8060 TRUCK WITH ARROW BOARD & ATTENUATOR $ 543.00 $ 1,358.00 $ 3,395.00 551 8080 TRAILER MOUNTED ATTENUATOR W/ARROWBOARD $ 488.00 $ 1,165.00 $ 2,790.00 551 2600 AUTO FLAGGER SYSTEM $ 574.00 $ 1,867.00 $ 5,245.00 551 1007 ARROW BOARD SOLAR $ 111.00 $ 319.00 $ 657.00
551 2030 MESSAGE BOARD SOLAR MINI $ 280.00 $ 557.00 $ 1,886.00 551 2055 MESSAGE BOARD SOLAR $ 307.00 $ 725.00 $ 1,295.00 553 3300 BARREL TRAFFIC CONTROL NR $ 6.00 $ 15.00 $ 33.00 553 1000 BARRICADE T1 24" X 8" EG $ 3.00 $ 10.00 $ 40.00 553 1090 BARRICADE T2 24" X 8" EG $ 4.00 $ 19.00 $ 71.00 #4..
- 297 -
553 1240 BARRICADE T3 96" X 8" EG BS $ 6.00 $ 29.00 $ 81.00 553 1270 BARRICADE T3 96" X 8" HI BS $ 6.00 $ 25.00 $ 68.00 553 1440 BARRICADE SAWHORSE 96" X 8" EG BS $ 5.00 $ 16.00 $ 41.00 553 3060 GRASPER CONE 42" HI $ 3.00 $ 8.00 $ 32.00
553 3090 TRAFFIC CONE 18" NR STANDARD $ 57.00 $ 3.00 $ 7.00 553 3120 TRAFFIC CONE 28" NR STANDARD $ 2.00 $ 3.00 $ 7.00 553 3140 TRAFFIC CONE 28" HI STANDARD $ 3.00 $ 5.00 $ 18.00 553 3265 CHANNELIZER TUBE 42" WITH 2"-3" HI $ 6.00 $ 8.00 $ 23.00 553 3330 BARREL TRAFFIC CONTROL 4" HI $ 3.00 $ 10.00 $ 38.00 553 3370 BARREL TRAFFIC CONTROL 6" HI $ 8.00 $ 15.00 $ 40.00 553 3490 BARREL BASE TRAFFIC CONTROL TIRE RING $ 3.00 $ 5.00 $ 10.00 553 3510 BASE CONE 11-20# RUBBER $ 3.00 $ 6.00 $ 20.00
553 3530 BASE CHANNELIZER TUBE 10-20# RUBBER $ 3.00 $ 8.00 $ 27.00 554 1037 BARRIER WALL END 5' WATER FILL $ 19.00 $ 51.00 $ 144.00 554 2015 BARRIER WALL WATER FILL TL3 HIGH $ 45.00 $ 84.00 $ 208.00 554 2020 Water Filled 6’ Barriers - $ 28.00 $ 62.00 $ 167.00 554 2021 WATER FILLED BARRIER CRASH ARRAY COMPONE $ 51.00 $ 113.00 $ 365.00 554 1005 BARRIER WALL 10' CONCRETE $ 17.00 $ 46.00 $ 133.00 554 8030 BARRIER WALL LIFTING DEVICE 9000 $ 178.00 $ 404.00 $ 1,234.00 554 8032 BARRIER WALL LIFTING DEVICE LP 12,000LBS $ 135.00 $ 398.00 $ 986.00 554 8034 BARRIER WALL LIFTING DEVICE 30,000LBS $ 135.00 $ 398.00 $ 986.00 555 1000 WARNING LIGHT TYPE A FLASH $ 5.00 $ 8.00 $ 25.00 555 1059 BALLOON LIGHT 1000WATT WITH STAND $ 78.00 $ 167.00 $ 398.00 555 1061 BALLOON LIGHT LED WITH STAND $ 86.00 $ 192.00 $ 458.00 555 1062 BALLOON LIGHT 1000-1600 WATT/CART $ 98.00 $ 218.00 $ 519.00 555 1063 LOW GLARE LIGHT DIFFUSER $ 74.00 $ 164.00 $ 390.00 556 1060 SIGN ROLLUP REFLECTIVE VINYL 10-16SF $ 5.00 $ 23.00 $ 86.00 556 1351 SIGN 48X48 DG BE PREPARED TO STOP $ 5.00 $ 23.00 $ 86.00 556 1637 SIGN 48X48 DG ROAD CLOSED $ 10.00 $ 22.00 $ 59.00 556 1817 SIGN 48X48 DG END CONSTRUCTION $ 5.00 $ 23.00 $ 86.00 556 2040 SIGN VARIABLE LEGEND HI < 10SF $ 8.00 $ 22.00 $ 63.00 556 3014 SIGN 48X48 EG END ROAD WORK $ 5.00 $ 23.00 $ 86.00 556 3120 PADDLE 24" EG STOP/SLOW $ 10.00 $ 29.00 $ 57.00 556 3194 SIGN 24X12 EG SIDEWALK CLOSED $ 5.00 $ 24.00 $ 88.00 556 3274 SIGN 18X24 EG CHEVRON $ 6.00 $ 16.00 $ 45.00
556 3284 SIGN 48X48 EG ROAD WORK AHEAD $ 5.00 $ 24.00 $ 88.00 556 3294 SIGN 48X48 EG DETOUR AHEAD $ 5.00 $ 24.00 $ 90.00 556 3298 SIGN 48X48 EG ROAD CLOSED AHEAD $ 5.00 $ 23.00 $ 86.00 556 3316 SIGN 48X48 EG FLAGGER (SYMBOL) $ 5.00 $ 23.00 $ 86.00 556 3340 SIGN 48X48 EG SHOULDER CLOSED AHEAD $ 5.00 $ 22.00 $ 82.00 556 3372 SIGN 48X48 EG RIGHT MERGE (SYMBOL) $ 5.00 $ 23.00 $ 86.00 556 3810 SIGN 48X48 EG UTILITY WORK AHEAD $ 5.00 $ 23.00 $ 86.00 556 5112 SIGN 48X30 HI ROAD CLOSED $ 7.00 $ 16.00 $ 36.00 556 7939 SIGN 48X48 DF RIGHT LANE CLOSED AHEAD $ 5.00 $ 24.00 $ 88.00 556 8025 OBJECT MARKER HI $ 3.00 $ 5.00 $ 15.00
556 8515 SIGN STAND TRIPOD $ 4.00 $ 20.00 $ 77.00
556 8520 SIGN STAND PORTABLE WITHOUT SPRING $ 4.00 $ 20.00 $ 79.00 556 8545 SIGN STAND PORTABLE WITH SPRING $ 20.00 $ 57.00 $ 170.00 600 2002 EVNT RESTROOM TRLR- 2 STATION $ 1,520.00 $ 1,520.00 $ 4,615.00 600 2003 EVNT RESTROOM TRLR- 3 STATION $ 1,856.00 $ 1,856.00 $ 5,167.00 600 2004 EVNT RESTROOM TRLR- 4 STATION $ 2,195.00 $ 2,195.00 $ 6,107.00 600 2007 EVNT RESTROOM TRLR- 7 STATION $ 2,607.00 $ 2,607.00 $ 7,920.00 600 2008 EVNT RESTROOM TRLR- 8 STATION $ 5,758.00 $ 2,758.00 $ 8,639.00 600 2010 EVNT RESTROOM TRLR- 10 STATION $ 2,984.00 $ 2,984.00 $ 8,868.00 600 2013 EVNT RESTROOM TRLR- 13 STATION $ 3,322.00 $ 3,322.00 $ 10,314.00 600 2109 RESTROOM TRLR- 9 STATION $ 2,932.00 $ 2,932.00 $ 8,735.00 600 2152 ADA RESTROOM TRLR - 2 STATION $ 3,158.00 $ 3,158.00 $ 6,843.00 600 2159 ADA RESTROOM TRLR- 9 STATION $ 3,354.00 $ 3,354.00 $ 11,524.00 600 2202 SHWR/RESTROOM COMBO TRLR-2 STATION $ 3,308.00 $ 3,308.00 $ 11,577.00 600 2204 SHWR/RESTROOM COMBO TRLR-4 STATION $ 6,616.00 $ 6,616.00 $ 23,154.00 600 2206 SHWR/RESTROOM COMBO TRLR-6 STATION $ 8,600.00 $ 8,600.00 $ 30,100.00 600 2306 SHOWER TRAILER - 6 STATION $ 5,053.00 $ 5,053.00 $ 17,685.00 #4..
- 298 -
600 2308 SHOWER TRAILER - 8 STATION $ 6,737.00 $ 6,737.00 $ 23,580.00 600 2350 LAUNDRY TRAILER - 6 SET $ 5,053.00 $ 5,053.00 $ 17,685.00 600 2495 4 X 4 CONTAINMENT TRAY - RESTROOM $ 30.00 $ 30.00 $ 30.00 600 1090 TOILET SINGLE MOUNT TRAILER KIT $ 269.00 $ 269.00 $ 269.00 600 1280 HAND WASHING UNIT $ 89.00 $ 89.00 $ 89.00
600 1287 HAND SANITIZER STAND $ 91.00 $ 91.00 $ 91.00
600 2410 STANDARD PORTABLE RESTROOM $ 34.00 $ 34.00 $ 34.00 600 2420 ENHANCED PORTABLE RESTROOM $ 110.00 $ 110.00 $ 110.00 600 2430 DELUXE PORTABLE RESTROOM $ 132.00 $ 132.00 $ 132.00 600 2440 HANDICAP PORTABLE RESTROOM $ 153.00 $ 153.00 $ 153.00 600 2441 EVENT HANDICAP PORTABLE RESTROOM $ 216.00 $ 216.00 $ 216.00 600 2450 HIGH RISE PORTABLE RESTROOM $ 85.00 $ 85.00 $ 85.00 600 2460 MINI PORTABLE RESTROOM $ 85.00 $ 85.00 $ 85.00 600 2475 SINK - PORTABLE $ 45.00 $ 45.00 $ 45.00
600 2476 EVENT SINK - PORTABLE $ 79.00 $ 79.00 $ 79.00
600 2480 PORTABLE SHOWER $ 485.00 $ 485.00 $ 485.00
600 2485 WASTE HOLDING TANK $ 40.00 $ 40.00 $ 40.00
600 2490 FRESH WATER SYSTEM $ 284.00 $ 284.00 $ 284.00
605 10 AUDIBLE HIGH LEVEL ALARM $ 56.00 $ 167.00 $ 502.00 605 1250 TANK 21K GAL FXDAXL VPR TIGHT W/COILS $ 128.00 $ 384.00 $ 1,152.00 605 1300 TANK 21K GAL FXDAXL COILS CR $ 128.00 $ 383.00 $ 1,150.00 605 1400 TANK 21K GAL FXDAXL LINED W/COILS CR $ 128.00 $ 383.00 $ 1,150.00 605 1920 TANK 18K GAL DW FA SFVP LINED $ 288.00 $ 862.00 $ 2,585.00 605 2000 TANK 21K GAL T-OIL FXDAXL VPR TIGHT LINE $ 72.00 $ 509.00 $ 2,323.00 605 2050 TANK 21K GAL FXDAXL GASBUSTER $ 206.00 $ 617.00 $ 1,849.00 605 2250 TANK 9K GAL OPEN TOP (MUD BOX) $ 139.00 $ 418.00 $ 1,255.00 605 2310 TANK 10K GAL CLOSED TOP SKID LINED $ 125.00 $ 373.00 $ 1,119.00 605 2350 TANK 8400 GAL MINI FRAC LINED $ 111.00 $ 334.00 $ 1,002.00 605 2400 TANK 17K GAL MIX FA W/COILS $ 392.00 $ 1,177.00 $ 3,532.00 605 2450 TANK 20K GAL MIX FA W/COILS LINED $ 392.00 $ 1,175.00 $ 3,526.00 605 2500 TANK 20K GAL MIX EZ CLEAN FA W/COILS $ 380.00 $ 1,140.00 $ 3,421.00 605 3670 TANK 4K GAL TD POLY $ 84.00 $ 254.00 $ 762.00
605 3820 TANK 6500 GAL TD POLY $ 102.00 $ 308.00 $ 922.00 605 3830 TANK 6500 GAL TD POLY W/LINER $ 125.00 $ 373.00 $ 1,118.00 605 3950 TANK 6300 GAL ROLLOFF POLY TANK LINED $ 145.00 $ 434.00 $ 1,300.00 605 4100 TANK 17.6K GAL UPRIGHT CONE BOTTOM SKID $ 225.00 $ 675.00 $ 2,025.00 605 4130 TANK 17.6K GAL UPRIGHT CONE BTM SKD COIL $ 201.00 $ 604.00 $ 1,813.00 605 4500 TANK 21K GAL OPEN TOP $ 99.00 $ 409.00 $ 1,266.00 605 4580 TANK 21K GAL EZ CLEAN SV LINED $ 102.00 $ 308.00 $ 922.00 605 5110 TANK 21K GAL FXDAXL VPR TIGHT LINED SM $ 119.00 $ 358.00 $ 1,076.00 605 5120 TANK 21K GAL FXDAXL RND BOTTOM $ 135.00 $ 406.00 $ 1,216.00 605 5130 TANK 21K GAL FXDAXL RND BOTTOM MANIFOLD $ 100.00 $ 299.00 $ 897.00 605 5150 TANK 21K GAL FXDAXL EZ CLEAN OT LINED $ 112.00 $ 338.00 $ 1,016.00 605 5200 TANK 21K GAL FXDAXL VPR TIGHT LINED CR $ 116.00 $ 348.00 $ 1,044.00 605 5210 TANK 21K FXDAXL SV OPEN TOP CVT LINED $ 102.00 $ 307.00 $ 921.00 605 5230 TANK 21K GAL FXDAXL LINED MANIFOLD CR $ 107.00 $ 319.00 $ 956.00 605 5500 TANK 18K GAL FXDAXL EZ CLEAN OT LND WEIR $ 128.00 $ 385.00 $ 1,156.00 605 5650 TANK 21K FXDAXL SV OPEN TOP CVT LW $ 128.00 $ 384.00 $ 1,152.00 605 5800 TANK CLARIFIER OPEN TOP LND WEIR $ 83.00 $ 490.00 $ 1,228.00 605 7010 TANK TRL MC307/DOT407 SST PRESS REAR $ 353.00 $ 1,057.00 $ 3,172.00 605 7920 BOX 25 YD METAL LID ROLL OFF $ 44.00 $ 131.00 $ 394.00 605 8150 BOX 18 YD PLASTIC LID ROLL OFF $ 61.00 $ 181.00 $ 543.00 605 8250 BOX 20 YD ROLL TARP ROLL OFF $ 34.00 $ 100.00 $ 299.00 605 8350 BOX 25 YD ROLL TARP ROLL OFF $ 30.00 $ 92.00 $ 276.00 605 8700 BOX 30 YD TRASH ROLL OFF $ 35.00 $ 103.00 $ 311.00 605 9030 BOX 25 YD DEWATERING ROLL TARP W/INSERT $ 45.00 $ 319.00 $ 1,267.00 605 9100 BOX 25 YD VACUUM ROLL OFF $ 28.00 $ 199.00 $ 801.00 610 1030 FILTER 4" 4 BAG CS $ 239.00 $ 608.00 $ 1,789.00 610 1080 FILTER 12" 24 BAG CS $ 613.00 $ 1,303.00 $ 3,672.00 610 1301 FILTER 3" DUPLEX BAG SST $ 183.00 $ 549.00 $ 1,649.00 610 1302 FILTER 3" DUPLEX BAG CS $ 113.00 $ 339.00 $ 1,017.00 610 1600 FILTER 6" SIMPLEX BAG $ 382.00 $ 1,146.00 $ 3,439.00 #4..
- 299 -
610 210 CLARIFIER INSERTS $ 395.00 $ 1,582.00 $ 5,424.00 610 2454 FILTER 4 POD 54" DIAMETER SAND $ 399.00 $ 1,198.00 $ 3,592.00 610 2530 FILTER 10K LB KLEEN WATER DUAL $ 657.00 $ 1,973.00 $ 5,920.00 610 3221 FILTER 2K LB HI/PRES KLEEN WATER W/INT $ 84.00 $ 253.00 $ 757.00 625 1010 SAW CONCRETE 18" GAS $ 112.00 $ 291.00 $ 754.00 625 2000 SAW BRICK/MASONRY 14" ELECTRIC $ 48.00 $ 144.00 $ 372.00 625 4500 CHAINSAW 18" $ 75.00 $ 206.00 $ 485.00
625 4600 CHAINSAW 20" $ 70.00 $ 208.00 $ 570.00
625 6950 CHAINSAW CONCRETE GAS $ 189.00 $ 561.00 $ 1,202.00 625 7250 SAW CONCRETE 13HP $ 122.00 $ 327.00 $ 781.00
625 7270 SAW CONCRETE 10-13HP SELF PROPELLED $ 89.00 $ 262.00 $ 719.00 625 7350 SAW CONCRETE 20-29HP SELF PROPELLED $ 157.00 $ 430.00 $ 983.00 625 7400 SAW CONCRETE 30-39HP SELF PROPELLED $ 170.00 $ 504.00 $ 1,194.00 625 7405 SAW CONCRETE 40-49HP SELF PROPELLED $ 259.00 $ 746.00 $ 1,845.00 625 7600 SAW CONCRETE 60-69HP SELF PROPELLED $ 297.00 $ 896.00 $ 1,909.00 625 7625 SAW CONCRETE OVER 69HP SELF PROPELLED $ 326.00 $ 924.00 $ 1,834.00 625 7750 SAW CUT-OFF 12" GAS $ 71.00 $ 212.00 $ 537.00
625 7800 SAW CUT-OFF 14" ELECTRIC $ 64.00 $ 144.00 $ 341.00 625 7805 SAW CUT-OFF 14" GAS $ 95.00 $ 240.00 $ 590.00
625 8300 SAW TILE 10" $ 95.00 $ 236.00 $ 581.00
625 9428 BLADE DIAMOND ASPHALT 18" $ 89.00 $ 219.00 $ 427.00 625 9436 BLADE DIAMOND ASPHALT 20" $ 162.00 $ 569.00 $ 634.00 625 9480 DIAMOND BLADE 14" $ 59.00 $ 161.00 $ 378.00
625 9510 BLADE DIAMOND CONCRETE 18" $ 68.00 $ 184.00 $ 388.00 625 9513 BLADE DIAMOND CONCRETE 18" $ 99.00 $ 313.00 $ 547.00 625 9514 BLADE DIAMOND CONCRETE 20" $ 116.00 $ 270.00 $ 489.00 625 9516 BLADE DIAMOND CONCRETE 24" $ 136.00 $ 395.00 $ 800.00 675 2078 DIAGONAL BRACE 7' GALVANIZED $ 2.00 $ 5.00 $ 9.00 675 2144 BASE PLATE SWIVEL GALVANIZED $ 17.00 $ 40.00 $ 84.00 675 3822 PLA-8 8' PLANK 9.25 X 1.50 DOUG FIR $ 2.00 $ 5.00 $ 9.00 675 4308 STAIRWELL 6' VX STRUCTURE $ 124.00 $ 431.00 $ 745.00 675 4330 BASE PLATE $ 18.00 $ 30.00 $ 88.00
675 4400 END FRAME WITH LEGS SINGLE WIDE BASE $ 144.00 $ 146.00 $ 282.00 675 4420 END FRAME WITH LEGS DOUBLE WIDE BASE $ 205.00 $ 214.00 $ 416.00 675 5350 SCAFFOLD FRAME 5' X 6' 6" WALK THROUGH $ 6.00 $ 9.00 $ 21.00 675 6060 SCAFFOLDING OUTRIGGERS $ 6.00 $ 9.00 $ 18.00
675 6191 PLANK ALUMINUM 7' $ 9.00 $ 15.00 $ 29.00
675 6220 SCAFFOLD PLANK 19" X 10' $ 7.00 $ 14.00 $ 33.00 675 6224 WALKBOARD 18" X 7' $ 7.00 $ 11.00 $ 22.00
675 7452 SCAFFOLDING SIDE BRACES $ 3.00 $ 7.00 $ 10.00
675 7520 SCAFFOLD ROLLING 6' X 30" $ 26.00 $ 68.00 $ 157.00 675 7530 SCREWJACK WITH BASE PLATE $ 5.00 $ 7.00 $ 15.00 675 7550 BASE PLATE FIXED $ 2.00 $ 8.00 $ 21.00
675 7556 END FRAME 6' $ 7.00 $ 8.00 $ 21.00
675 7640 LOCKING PIN $ 3.00 $ 4.00 $ 5.00
675 9027 SCAFFOLD TOWER 12' ROLLING $ 98.00 $ 206.00 $ 477.00 675 9402 TRENCH BRIDGE WHEEL KIT $ 37.00 $ 115.00 $ 320.00 675 9415 TRENCH BRIDGE STEEL 8' $ 55.00 $ 159.00 $ 465.00 675 9435 TRENCH BRIDGE STEEL 12' $ 53.00 $ 260.00 $ 773.00 675 9980 TRENCH GUARD RAIL 4' $ 10.00 $ 29.00 $ 71.00
675 9981 TRENCH GUARD RAIL 4' WITH GATE $ 11.00 $ 31.00 $ 82.00 675 9982 TRENCH GUARD RAIL 6' WITH GATE $ 12.00 $ 30.00 $ 81.00 675 9983 TRENCH GUARD RAIL 6' $ 11.00 $ 21.00 $ 62.00
675 9984 TRENCH GUARD RAIL 8' $ 17.00 $ 39.00 $ 81.00
675 9985 TRENCH GUARD RAIL 8' WITH GATE $ 17.00 $ 40.00 $ 83.00 675 9986 TRENCH GUARD RAIL 10' WITH GATE $ 18.00 $ 45.00 $ 108.00 675 9987 TRENCH GUARD RAIL 10' $ 18.00 $ 42.00 $ 90.00
675 9988 TRENCH GUARD RAIL 12' WITH GATE $ 24.00 $ 52.00 $ 109.00 675 9989 TRENCH GUARD RAIL 12' $ 20.00 $ 49.00 $ 108.00 675 9990 TRENCH GUARD RAIL BRACKET $ 4.00 $ 7.00 $ 15.00 675 9994 MAPS GUARD RAIL BRACKET $ 1.00 $ 3.00 $ 9.00
700 2000 LASER SELF LEVELING CONSTRUCTION $ 73.00 $ 162.00 $ 384.00 #4..
- 300 -
700 2100 LASER PIPE $ 146.00 $ 365.00 $ 909.00
750 1040 SWEEPER WALKBEHIND $ 172.00 $ 435.00 $ 921.00
750 1100 SWEEPER RIDE ON 6' WINDROW $ 274.00 $ 812.00 $ 1,865.00 750 1105 SWEEPER RIDE ON 8' WINDROW THREE WHEEL $ 321.00 $ 947.00 $ 2,136.00 750 1106 SWEEPER 8' 4 WHEEL ROPS $ 350.00 $ 977.00 $ 2,309.00 750 1107 SWEEPER 8' 4 WHEEL CAB $ 383.00 $ 1,156.00 $ 2,518.00 750 1110 SWEEPER RIDE ON PICK UP $ 521.00 $ 1,342.00 $ 3,446.00 750 1115 SWEEPER/SCRUBBER RIDE ON $ 521.00 $ 1,304.00 $ 3,256.00 800 1255 BIT CARBIDE MISCELLANEOUS SIZE $ 13.00 $ 37.00 $ 72.00 800 1350 BIT SDS MAX 1 1/2" X 18" $ 13.00 $ 48.00 $ 109.00 800 2330 BLADE TILE STRIPPING DEMO/ROTARY HAMMER $ 30.00 $ 77.00 $ 177.00 800 3000 EXTENSION CORD 10/3 50' UG $ 6.00 $ 11.00 $ 28.00 800 3018 EXTENSION CORD 12/3 10' $ 15.00 $ 29.00 $ 49.00 800 3025 EXTENSION CORD 12/3 50' 110V $ 5.00 $ 10.00 $ 25.00 800 3075 EXTENSION CORD 12/3 100' 110V $ 6.00 $ 13.00 $ 30.00 800 3105 EXTENSION CORD 50' 120V $ 5.00 $ 15.00 $ 31.00 800 3325 BOX TEMPOWER GFI DISTRIBUTION $ 26.00 $ 71.00 $ 158.00 800 3750 CORD TEMPOWER 6/4 50' $ 28.00 $ 68.00 $ 92.00
800 3775 CORD TEMPOWER 6/4 100' $ 26.00 $ 68.00 $ 155.00 800 4375 LOCATOR PIPE AND CABLE $ 110.00 $ 245.00 $ 584.00 850 2473 CRIMPER PIPE PRESS RINGS XL $ 150.00 $ 334.00 $ 794.00 850 6050 BRAKE ALUMINUM SIDING $ 84.00 $ 214.00 $ 451.00 850 7095 CRIMPER PIPE CORDLESS $ 213.00 $ 472.00 $ 1,124.00 900 930 SPREADER HYDRAULIC SAND/SALT $ 107.00 $ 303.00 $ 669.00 900 8125 MOTORGRADER 125HP 12' BLADE $ 793.00 $ 2,340.00 $ 5,474.00 900 8150 MOTORGRADER 195-205HP 14' BLADE $ 1,157.00 $ 4,272.00 $ 10,293.00 900 8165 MOTORGRADER 206-235HP 14' BLADE $ 1,187.00 $ 3,391.00 $ 8,246.00 900 249 PEDISTRIAN MAT 3' X 5' $ 9.00 $ 27.00 $ 98.00
900 250 COMPOSITE MAT HD $ 13.00 $ 92.00 $ 335.00
900 300 COMPOSITE MAT T-BAR TOOL $ 2.00 $ 9.00 $ 28.00
900 305 COMPOSITE MAT PINS $ 2.00 $ 3.00 $ 7.00
900 255 COMPOSITE MAT MEDIUM DUTY $ 19.00 $ 50.00 $ 148.00 902 15 BACKHOE/LOADER COMPACT 20-29HP 4WD $ 236.00 $ 696.00 $ 1,683.00 902 1020 BACKHOE/LOADER 60-90HP 4WD $ 342.00 $ 912.00 $ 2,191.00 902 1021 BACKHOE/LOADER 60-90HP 4WD CAB EXT-A-HOE $ 427.00 $ 1,185.00 $ 2,268.00 902 1100 BACKHOE/LOADER 60-90HP 4WD EXT-A-HOE $ 353.00 $ 955.00 $ 2,197.00 902 1101 BACKHOE/LOADER 60-90HP 4WD CAB $ 427.00 $ 1,252.00 $ 2,627.00 902 1210 BACKHOE/LOADER 91-104HP 4WD EXT-A-HOE $ 438.00 $ 1,309.00 $ 2,956.00 902 1330 BACKHOE/LOADER OVER 105HP 4WD EXT-A-HOE $ 543.00 $ 1,588.00 $ 3,757.00 902 1350 BACKHOE/LOADER OVER 121HP 4WD EXT-HOE $ 528.00 $ 1,804.00 $ 4,806.00 902 5018 BACKHOE BUCKET 18" $ 3.00 $ 11.00 $ 24.00
902 5024 BACKHOE BUCKET 24" $ 34.00 $ 73.00 $ 170.00
902 5030 BACKHOE BUCKET 30" $ 13.00 $ 30.00 $ 52.00
902 5215 BACKHOE BREAKER $ 330.00 $ 821.00 $ 2,002.00
902 5225 BACKHOE VIBRATORY PLATE COMPACTOR $ 203.00 $ 510.00 $ 1,269.00 902 5250 BACKHOE 18" COMPACTION WHEEL $ 138.00 $ 414.00 $ 943.00 902 5300 BACKHOE AUGER POWER UNIT $ 196.00 $ 532.00 $ 1,124.00 903 595 SKID STEER TRACK LOADER 3400# AND OVER $ 491.00 $ 1,312.00 $ 2,955.00 903 105 SKID STEER LOADER 2600# AND OVER $ 342.00 $ 1,025.00 $ 2,231.00 903 13 SKID STEER MINI 601-950# DSL TRACKED $ 218.00 $ 660.00 $ 1,485.00 903 15 SKID STEER LOADER 601-850# $ 218.00 $ 660.00 $ 1,485.00 903 45 SKID STEER LOADER 1351-1699# $ 232.00 $ 674.00 $ 1,492.00 903 5036 SKID STEER BUCKET 36" SMOOTH $ 8.00 $ 30.00 $ 97.00 903 5058 SKID STEER BUCKET 68" SMOOTH $ 3.00 $ 9.00 $ 21.00 903 5061 SKID STEER BUCKET 60" SMOOTH $ 9.00 $ 23.00 $ 53.00 903 5066 SKID STEER BUCKET 66" SMOOTH $ 2.00 $ 6.00 $ 13.00 903 5067 SKID STEER BUCKET 66" TOOTH $ 6.00 $ 14.00 $ 36.00 903 5072 SKID STEER BUCKET 72" TOOTH $ 6.00 $ 18.00 $ 41.00 903 5073 SKID STEER BUCKET 72" SMOOTH $ 45.00 $ 84.00 $ 260.00 903 5074 SKID STEER BUCKET 74" SMOOTH $ 3.00 $ 11.00 $ 30.00 903 5078 SKID STEER BUCKET 78" SMOOTH $ 6.00 $ 13.00 $ 26.00 903 5079 SKID STEER BUCKET 78" TOOTH $ 3.00 $ 10.00 $ 37.00 #4..
- 301 -
903 5200 SKID STEER GRAPPLE BUCKET $ 122.00 $ 298.00 $ 726.00 903 5215 SKID STEER SNOW BUCKET $ 23.00 $ 69.00 $ 165.00 903 522 SKID STEER TRACK LOADER WALKBEHIND $ 220.00 $ 530.00 $ 1,326.00 903 5305 SKID STEER BRUSH MOWER ATTACHMENT $ 192.00 $ 397.00 $ 1,297.00 903 5310 SKID STEER TRENCHER ATTACHMENT $ 185.00 $ 455.00 $ 1,138.00 903 5330 SKID STEER PLANER ATTACHMENT $ 568.00 $ 1,590.00 $ 2,677.00 903 5335 SKID STEER ROCKHOUND $ 197.00 $ 513.00 $ 1,281.00 903 5343 SKID STEER 72"' DOZER BLADE ATTACHMENT $ 94.00 $ 274.00 $ 615.00 903 5355 SKID STEER BREAKER $ 218.00 $ 621.00 $ 1,382.00 903 5381 SKID STEER MULCHING HEAD $ 313.00 $ 1,083.00 $ 2,720.00 903 5385 SKID STEER LANDSCAPE RAKE ATTACHMENT $ 175.00 $ 475.00 $ 918.00 903 5410 SKID STEER FORK ATTACHMENT $ 57.00 $ 142.00 $ 342.00 903 5411 SKID STEER FORK ATTACHMENT HEAVY DUTY $ 52.00 $ 179.00 $ 419.00 903 5413 SKID STEER GRAPPLE FORK ATTACHMENT $ 157.00 $ 392.00 $ 812.00 903 5435 SKID STEER PICKUP BROOM WITH DUMP BUCKET $ 139.00 $ 357.00 $ 864.00 903 5440 SKID STEER ANGLE BROOM $ 135.00 $ 317.00 $ 811.00 903 5475 SKID STEER SNOW PLOW ATTACHMENT $ 76.00 $ 214.00 $ 448.00 903 5491 SKID STEER ROOT GRAPPLE BUCKET $ 115.00 $ 303.00 $ 609.00 903 5500 SKID STEER AUGER POWER UNIT $ 112.00 $ 276.00 $ 732.00 903 5598 SKID STEER AUGER EXTENSION 2' HEX $ 32.00 $ 116.00 $ 203.00 903 5600 SKID STEER AUGER EXTENSION $ 21.00 $ 106.00 $ 213.00 903 5606 SKID STEER AUGER BIT 6" $ 31.00 $ 96.00 $ 224.00 903 5609 SKID STEER AUGER BIT 9" $ 44.00 $ 109.00 $ 273.00 903 561 SKID STEER TRACK LOADER 1300-1699# $ 342.00 $ 1,025.00 $ 2,231.00 903 5612 SKID STEER AUGER BIT 12" $ 41.00 $ 107.00 $ 296.00 903 5618 SKID STEER AUGER BIT 18" $ 46.00 $ 138.00 $ 218.00 903 5624 SKID STEER AUGER BIT 24" $ 55.00 $ 151.00 $ 344.00 903 5630 SKID STEER AUGER BIT 30" $ 58.00 $ 156.00 $ 326.00 903 5636 SKID STEER AUGER BIT 36" $ 75.00 $ 186.00 $ 465.00 903 5670 SKID STEER MINI AUGER POWER UNIT $ 94.00 $ 389.00 $ 690.00 903 570 SKID STEER TRACK LOADER 1700-1999# $ 351.00 $ 1,056.00 $ 2,331.00 903 580 SKID STEER TRACK LOADER 2000-2399# $ 362.00 $ 1,078.00 $ 2,455.00 903 585 SKID STEER TRACK LOADER 2400-2799# $ 427.00 $ 1,100.00 $ 2,618.00 903 590 SKID STEER TRACK LOADER 2800-3399 $ 487.00 $ 1,262.00 $ 2,753.00 903 71 SKID STEER LOADER 1700-1899# $ 273.00 $ 789.00 $ 1,600.00 903 80 SKID STEER LOADER 1900-2000# $ 292.00 $ 825.00 $ 1,868.00 903 90 SKID STEER LOADER 2001-2599# $ 278.00 $ 895.00 $ 2,051.00 904 2000 LOADER WHEEL .99 CUBIC YARD AND UNDER $ 399.00 $ 1,083.00 $ 2,507.00 904 2010 LOADER WHEEL 1.0-1.4 CUBIC YARD $ 426.00 $ 1,144.00 $ 2,690.00 904 2020 LOADER WHEEL 2.0-2.5 CUBIC YARD $ 559.00 $ 1,781.00 $ 4,680.00 904 2025 LOADER WHEEL 2.5-2.9 CUBIC YARD $ 668.00 $ 1,913.00 $ 5,179.00 904 2030 LOADER WHEEL 3.0-3.4 CUBIC YARD $ 825.00 $ 2,111.00 $ 5,549.00 904 2035 LOADER WHEEL 3.5-3.9 CUBIC YARD $ 937.00 $ 2,338.00 $ 5,848.00 904 2040 LOADER WHEEL 4.0 CUBIC YARD $ 1,236.00 $ 3,086.00 $ 7,298.00 904 2045 LOADER WHEEL 5.0-5.9 CUBIC YARD $ 1,519.00 $ 3,791.00 $ 9,469.00 904 3020 LOADER LANDSCAPER 4WD $ 295.00 $ 896.00 $ 1,999.00 904 4530 LOADER TRACK 2.0 CUBIC YARD $ 1,008.00 $ 2,527.00 $ 6,320.00 904 6205 LOADER WHEEL SNOW BUCKET $ 350.00 $ 423.00 $ 750.00 904 6234 LOADER WHEEL ROOT RAKE $ 73.00 $ 219.00 $ 438.00 904 6240 LOADER WHEEL FORK ATTACHMENT $ 43.00 $ 154.00 $ 399.00 905 1005 EXCAVATOR 19000# REDUCED TAIL SWING $ 512.00 $ 1,546.00 $ 3,698.00 905 1015 EXCAVATOR 25000-29999# $ 763.00 $ 2,019.00 $ 4,889.00 905 1030 EXCAVATOR 30000-34999# $ 810.00 $ 2,082.00 $ 5,008.00 905 1032 EXCAVATOR 30000-34999# RUBBER TRACK $ 707.00 $ 2,185.00 $ 5,403.00 905 1035 EXCAVATOR 30000-34999#REDUCED TAIL SWING $ 847.00 $ 2,276.00 $ 5,521.00 905 1045 EXCAVATOR 35000-39999# $ 847.00 $ 2,185.00 $ 5,521.00 905 1060 EXCAVATOR 43000-49999# $ 983.00 $ 2,611.00 $ 6,325.00 905 1080 EXCAVATOR 50000-59999# REDUCED TAIL SWG $ 1,162.00 $ 2,901.00 $ 7,665.00 905 1085 EXCAVATOR 50000-55999# $ 1,162.00 $ 2,901.00 $ 7,665.00 905 1095 EXCAVATOR 53000-59999# LONG REACH $ 1,575.00 $ 4,211.00 $ 10,758.00 905 1135 EXCAVATOR 63000-66999# $ 1,526.00 $ 3,756.00 $ 10,158.00 905 1145 EXCAVATOR 60000-69999# LONG REACH $ 1,708.00 $ 4,440.00 $ 10,352.00 #4..
- 302 -
905 1150 EXCAVATOR 70000-79000# $ 1,712.00 $ 4,606.00 $ 11,520.00 905 5035 EXCAVATOR BUCKET 36" $ 4.00 $ 19.00 $ 37.00
905 5045 EXCAVATOR BUCKET 48" $ 11.00 $ 34.00 $ 75.00
905 5085 EXCAVATOR GRAPPLE THUMB 7500# $ 58.00 $ 148.00 $ 316.00 905 7025 EXCAVATOR BREAKER 1500-2000# $ 621.00 $ 1,565.00 $ 3,906.00 905 7030 EXCAVATOR BREAKER 2001-2500# $ 512.00 $ 1,368.00 $ 3,503.00 905 7035 EXCAVATOR BREAKER 3000-3500# $ 635.00 $ 1,877.00 $ 4,531.00 905 7045 EXCAVATOR BREAKER 4000-4500# $ 743.00 $ 2,451.00 $ 6,055.00 905 7050 EXCAVATOR BREAKER 5000# $ 796.00 $ 2,103.00 $ 5,568.00 905 7100 EXCAVATOR COMPACTION WHEEL 24" $ 243.00 $ 623.00 $ 1,208.00 905 7105 EXCAVATOR COMPACTION WHEEL 36" $ 208.00 $ 690.00 $ 1,251.00 905 7155 EXCAVATOR VIB PILE HAMMER ATTACHMENT $ 1,177.00 $ 3,024.00 $ 7,335.00 906 2070 DOZER STANDARD TRACK 70HP $ 587.00 $ 1,537.00 $ 3,793.00 906 2090 DOZER STANDARD TRACK 90-95HP $ 690.00 $ 1,858.00 $ 4,557.00 906 2150 DOZER STANDARD TRACK 140-150HP $ 1,121.00 $ 2,970.00 $ 8,594.00 906 2270 DOZER LOW GROUND PRESSURE 70HP $ 584.00 $ 1,621.00 $ 3,913.00 906 2290 DOZER LOW GROUND PRESSURE 90-95HP $ 761.00 $ 2,013.00 $ 4,809.00 906 2305 DOZER LOW GROUND PRESSURE 100-115HP $ 871.00 $ 2,241.00 $ 5,468.00 906 2330 DOZER LOW GROUND PRESSSURE 125-139HP $ 940.00 $ 2,536.00 $ 6,326.00 906 2350 DOZER LOW GROUND PRESSURE 140-150HP $ 1,272.00 $ 3,319.00 $ 9,494.00 906 2905 DOZER BRUSH RAKE LARGE EQUIPMENT $ 100.00 $ 280.00 $ 1,068.00 907 45 MINI EXCAVATOR 4000-4999# $ 291.00 $ 856.00 $ 2,009.00 907 46 MINI EXCAVATOR 4000-4999# ELECTRIC $ 425.00 $ 1,100.00 $ 2,650.00 907 85 MINI EXCAVATOR 8500# ZERO TAIL SWING $ 341.00 $ 1,012.00 $ 2,329.00 907 500 MINI EXCAVATOR BUCKET CLEAN OUT $ 17.00 $ 29.00 $ 56.00 907 524 MINI EXCAVATOR BUCKET 12" SMOOTH $ 2.00 $ 6.00 $ 10.00 907 534 MINI EXCAVATOR BUCKET 18" SMOOTH $ 7.00 $ 18.00 $ 37.00 907 550 MINI EXCAVATOR BUCKET 30" $ 5.00 $ 13.00 $ 25.00 907 554 MINI EXCAVATOR BUCKET 36" SMOOTH $ 7.00 $ 16.00 $ 25.00 907 555 MINI EXCAVATOR BUCKET 36" $ 7.00 $ 16.00 $ 30.00 907 556 MINI EXCAVATOR BUCKET 36" DITCHING $ 15.00 $ 58.00 $ 106.00 907 560 MINI EXCAVATOR POWERTILT ATTACHMENT $ 65.00 $ 190.00 $ 364.00 907 572 MINI EX BRUSH CUTTER/MOWER $ 109.00 $ 551.00 $ 1,103.00 907 580 MINI EXCAVATOR VIBRATORY PLATE $ 213.00 $ 508.00 $ 1,041.00 907 100 MINI EXCAVATOR 10000-14000# $ 368.00 $ 1,049.00 $ 2,408.00 907 111 MINI EXCAVATOR 10000-13999# REDUCED TAIL $ 445.00 $ 1,296.00 $ 2,833.00 907 114 MINI EXCAVATOR 15000-19999# $ 502.00 $ 1,449.00 $ 3,372.00 907 29 MINI EXCAVATOR 2000-2999# $ 231.00 $ 674.00 $ 1,634.00 907 35 MINI EXCAVATOR 3000-3999# $ 266.00 $ 739.00 $ 1,751.00 907 525 MINI EXCAVATOR BUCKET 12" $ 6.00 $ 11.00 $ 17.00 907 535 MINI EXCAVATOR BUCKET 18" $ 8.00 $ 15.00 $ 23.00 907 543 MINI EXCAVATOR BUCKET 24" SMOOTH $ 11.00 $ 57.00 $ 114.00 907 545 MINI EXCAVATOR BUCKET 24" $ 9.00 $ 17.00 $ 29.00 907 570 MINI EXCAVATOR BREAKER $ 215.00 $ 557.00 $ 1,365.00 907 575 MINI EXCAVATOR AUGER POWER UNIT $ 170.00 $ 480.00 $ 1,667.00 907 62 MINI EXCAVATOR 6000-6799# $ 281.00 $ 774.00 $ 1,845.00 907 68 MINI EXCAVATOR 6800-7399# $ 296.00 $ 783.00 $ 1,909.00 907 75 MINI EXCAVATOR 7400-9199# $ 325.00 $ 869.00 $ 2,021.00 907 92 MINI EXCAVATOR 9200-9999# $ 361.00 $ 957.00 $ 2,290.00 908 30 FARM TRACTOR 30HP $ 281.00 $ 688.00 $ 1,720.00
908 40 FARM TRACTOR 40HP $ 344.00 $ 889.00 $ 2,152.00
908 50 FARM TRACTOR 50HP $ 235.00 $ 686.00 $ 2,334.00
908 5260 FARM TRACTOR BOX BLADE 60" $ 179.00 $ 402.00 $ 818.00 908 5410 FARM TRACTOR MOWER ATTACHMENT $ 193.00 $ 607.00 $ 1,876.00 908 90 FARM TRACTOR 90HP+ $ 446.00 $ 1,438.00 $ 4,179.00 920 1210 TOTE BOX SHIPPING LARGE $ 6.00 $ 11.00 $ 17.00 920 1220 TOTE BOX SHIPPING MEDIUM $ 4.00 $ 8.00 $ 11.00 920 1230 TOTE BOX SHIPPING SMALL $ 2.00 $ 4.00 $ 6.00
920 2081 TRAILER TILT 7' X 18' TANDEM AXLE $ 95.00 $ 342.00 $ 816.00 920 3000 TRAILER EQUIPMENT SMALL $ 55.00 $ 137.00 $ 342.00 920 3017 TRAILER TILT 24' UP TO 24K $ 152.00 $ 445.00 $ 1,190.00 920 3020 TRAILER EQUIPMENT TANDEM AXLE $ 84.00 $ 259.00 $ 591.00 #4..
- 303 -
920 3030 TRAILER EQUIPMENT DOUBLE AXLE SPECIAL $ 159.00 $ 390.00 $ 1,061.00 920 3040 TRAILER UTILITY HYDRAULIC SINGLE AXLE $ 68.00 $ 223.00 $ 395.00 920 3041 TRAILER UTILITY HYDRAULIC TANDEM $ 77.00 $ 289.00 $ 498.00 920 3057 TRAILER EQUIPMENT DOUBLE AXLE 10 TON $ 155.00 $ 571.00 $ 1,251.00 920 3060 TRAILER TILLER $ 10.00 $ 34.00 $ 101.00
920 3066 TRAILER WALKBEHIND TRENCHER $ 17.00 $ 58.00 $ 146.00 920 3200 TRAILER REEL SMALL $ 216.00 $ 480.00 $ 1,144.00 920 5080 TRAILER FURNITURE 5' X 8' $ 54.00 $ 203.00 $ 432.00 920 5230 TRAILER EVAPORATIVE COOLING $ 410.00 $ 912.00 $ 2,713.00 920 5500 TRAILER UTILITY 8-10' TO 2K SINGLE $ 70.00 $ 229.00 $ 482.00 920 5600 TRAILER DUMP 10'-12' TO 9K TANDEM $ 179.00 $ 536.00 $ 1,262.00 920 5605 TRAILER GAS DUMP 8'-12' TO 9K TANDEM $ 75.00 $ 478.00 $ 1,111.00 920 5610 TRAILER DUMP 10'-12' 9K TO 12K TANDEM $ 216.00 $ 635.00 $ 1,574.00 920 5620 TRAILER DUMP 14'-16' TO 14K TANDEM $ 198.00 $ 632.00 $ 1,666.00 920 5625 TRAILER GAS DUMP 14'-16' TO 14K TANDEM $ 197.00 $ 586.00 $ 1,476.00 920 5630 TRAILER DUMP 10'-12' TO 16K OFFROAD TAND $ 198.00 $ 545.00 $ 1,342.00 920 5700 TRAILER TILT 8'-14' UP TO 7K SINGLE $ 61.00 $ 192.00 $ 424.00 920 5710 TRAILER TILT 12'-16' TO 9,999K TANDEM $ 71.00 $ 269.00 $ 589.00 920 5720 TRAILER TILT 12'-16' 10K TO 14K $ 108.00 $ 268.00 $ 669.00 920 5800 TRAILER EQUIP 12'-14' TO 8K DRP DCK TNDM $ 71.00 $ 272.00 $ 636.00 920 5820 TRAILER EQUIP 16'-18' TO 8K DRP $ 104.00 $ 373.00 $ 1,120.00 920 5840 TRAILER EQUIP 14'-16' 9-12K DRP DCK TNDM $ 91.00 $ 318.00 $ 709.00 920 5860 TRAILER EQUIP 18'-20' 9-12K DRP DCK TNDM $ 67.00 $ 192.00 $ 666.00 920 6000 TRAILER EQUIP 18-20 12K-15K DCK OVR TNDM $ 196.00 $ 468.00 $ 1,033.00 920 7005 TRAILER WATER TANK 500 GALLON $ 139.00 $ 417.00 $ 904.00 920 9100 TRAILER DUMP $ 164.00 $ 524.00 $ 1,143.00
920 9470 TRAILER CONCRETE MIXER 1YD GAS $ 55.00 $ 137.00 $ 342.00 920 9950 HITCH SLIDE IN $ 9.00 $ 29.00 $ 53.00
920 9952 HITCH SLIDE IN PINTLE COMBO $ 17.00 $ 53.00 $ 128.00 920 5254 BERM 10'X10' PORTABLE SPILL CONTAINMENT $ 50.00 $ 123.00 $ 297.00 920 5256 12 X 20 CONTAINMENT BERM $ 90.00 $ 219.00 $ 530.00 920 5260 TANK FUEL 251-300 GALLON $ 125.00 $ 250.00 $ 738.00 920 5415 MAT POLYETHYLENE 4' X 8' GROUND COVER $ 14.00 $ 44.00 $ 77.00 920 7361 TANK FUEL SINGLE WALL 500-550 GAL $ 101.00 $ 245.00 $ 628.00 920 7362 TANK FUEL DOUBLE WALL 500-550GAL W/OPUMP $ 124.00 $ 284.00 $ 1,481.00 920 7364 TANK FUEL DOUBLE WALL 500-550 GAL W/PUMP $ 124.00 $ 284.00 $ 809.00 920 7720 TANK FUEL $ 329.00 $ 657.00 $ 1,971.00
920 7750 TANK FUEL DOUBLE WALL 1000-1250 GAL $ 380.00 $ 765.00 $ 2,259.00 920 7755 TANK FUEL ENVIRONMENTAL 2300 GALLON $ 475.00 $ 985.00 $ 2,673.00 920 7758 TANK FUEL ENVIRONMENTAL 4000 GALLON $ 962.00 $ 1,671.00 $ 5,286.00 920 7763 TANK FUEL ENVIRONMENTAL 7000 GALLON $ 710.00 $ 1,147.00 $ 3,674.00 921 60 CONTAINER 8X20X8'6" $ 145.00 $ 145.00 $ 145.00
921 61 CONTAINER 8X20X8'6" PV3 $ 165.00 $ 165.00 $ 165.00 921 63 CONTAINER 8X20X8'6" SOLAR $ 165.00 $ 165.00 $ 165.00 921 120 CONTAINER 8X20X8'6" DBLE DOOR $ 155.00 $ 155.00 $ 155.00 921 180 CONTAINER 8X40X8'6" $ 180.00 $ 180.00 $ 180.00
921 181 CONTAINER 8X40X8'6" PV3 $ 195.00 $ 195.00 $ 195.00 921 220 CONTAINER 8X40X8'6" DBLE DOOR $ 190.00 $ 190.00 $ 190.00 921 183 CONTAINER 8X40X8'6" SOLAR $ 195.00 $ 195.00 $ 195.00 922 30 OFFICE TRAILER 10X40 W/RR $ 850.00 $ 850.00 $ 850.00 922 40 OFFICE TRAILER 10X40 NO RR $ 850.00 $ 850.00 $ 850.00 922 70 OFFICE TRAILER 10X50 W/RR $ 950.00 $ 950.00 $ 950.00 922 80 OFFICE TRAILER 10X50 NO RR $ 950.00 $ 950.00 $ 950.00 922 90 OFFICE TRAILER 12X60 W/RR $ 1,200.00 $ 1,200.00 $ 1,200.00 922 100 OFFICE TRAILER 12X60 NO RR $ 1,200.00 $ 1,200.00 $ 1,200.00 922 230 OFFICE TRAILER 8X24 $ 500.00 $ 500.00 $ 500.00
922 240 OFFICE TRAILER 8X30 W/RR $ 650.00 $ 650.00 $ 650.00 922 250 OFFICE TRAILER 8X30 NO RR $ 600.00 $ 600.00 $ 600.00 922 1000 MODULAR BUILDING STEPS $ 45.00 $ 45.00 $ 45.00 923 10 MODULAR BLDG 24X60 W/1-RR $ 1,700.00 $ 1,700.00 $ 1,700.00 923 30 MODULAR BLDG 24X60 NO RR $ 2,300.00 $ 2,300.00 $ 2,300.00 924 20 GLO/OFFICE CONTAINER 8X20X8'6" $ 575.00 $ 575.00 $ 575.00 #4..
- 304 -
924 40 GLO/OFFICE CONTAINER 8X20X8'6" OFF/STOR $ 525.00 $ 525.00 $ 525.00 924 60 GLO/OFFICE CONTAINER 8X40X9'6" $ 825.00 $ 825.00 $ 825.00 924 110 GLO/OFFICE CONTAINER 8X40X8'6" OFF/STOR $ 675.00 $ 675.00 $ 675.00 924 80 GLO/OFFICE CONTAINER 8X40X9'6" G3 W/RR $ 900.00 $ 900.00 $ 900.00 930 1101 TRENCHER 11-15HP WALKBEHIND TIRE $ 235.00 $ 721.00 $ 1,552.00 930 1102 TRENCHER 11-15HP WALKBEHIND TRACK $ 242.00 $ 720.00 $ 1,473.00 930 1200 TRENCHER 16-27HP WALKBEHIND TIRE $ 254.00 $ 750.00 $ 1,758.00 930 1230 TRENCHER 16-27HP WALKBEHIND TRACK $ 270.00 $ 831.00 $ 1,881.00 930 1350 TRENCHER 32-50HP $ 381.00 $ 1,066.00 $ 2,495.00 930 1440 TRENCHER 51-69HP $ 552.00 $ 1,523.00 $ 3,551.00 930 1520 TRENCHER RIDE ON WITH BACKHOE $ 413.00 $ 1,073.00 $ 2,672.00 940 5502 SPREADER BAR (KIT) 8" X 2' $ 5.00 $ 13.00 $ 41.00 940 5503 SPREADER BAR (KIT) 8" X 2.5' $ 5.00 $ 13.00 $ 41.00 940 5504 SPREADER BAR (KIT) 8" X 3' $ 5.00 $ 13.00 $ 41.00 940 5505 SPREADER BAR (KIT) 8" X 3.5' $ 5.00 $ 13.00 $ 41.00 940 5506 SPREADER BAR (KIT) 8" X 4' $ 5.00 $ 13.00 $ 41.00 940 5507 SPREADER BAR (KIT) 8" X 4.5' $ 5.00 $ 13.00 $ 41.00 940 5508 SPREADER BAR (KIT) 8" X 5' $ 5.00 $ 13.00 $ 41.00 940 5509 SPREADER BAR (KIT) 8" X 5.5' $ 5.00 $ 13.00 $ 41.00 940 5510 SPREADER BAR (KIT) 8" X 6' $ 5.00 $ 13.00 $ 41.00 940 5511 SPREADER BAR (KIT) 8" X 6.5' $ 5.00 $ 13.00 $ 41.00 940 5512 SPREADER BAR (KIT) 8" X 7' $ 5.00 $ 13.00 $ 41.00 940 5513 SPREADER BAR (KIT) 8" X 7.5' $ 5.00 $ 13.00 $ 52.00 940 5514 SPREADER BAR (KIT) 8" X 8' $ 5.00 $ 13.00 $ 41.00 940 5515 SPREADER BAR (KIT) 8" X 8.5' $ 5.00 $ 13.00 $ 41.00 940 5516 SPREADER BAR (KIT) 8" X 9' $ 5.00 $ 13.00 $ 41.00 940 5517 SPREADER BAR (KIT) 8" X 9.5' $ 5.00 $ 13.00 $ 41.00 940 5518 SPREADER BAR (KIT) 8" X 10' $ 5.00 $ 17.00 $ 46.00 940 5520 SPREADER BAR (KIT) 8" X 11' $ 10.00 $ 19.00 $ 53.00 940 5521 SPREADER BAR (KIT) 8" X 11.5' $ 5.00 $ 13.00 $ 39.00 940 5522 SPREADER BAR (KIT) 8" X 12' $ 7.00 $ 22.00 $ 62.00 940 5523 SPREADER BAR (KIT) 8" X 12.5' $ 5.00 $ 14.00 $ 41.00 940 5524 SPREADER BAR (KIT) 8" X 13' $ 5.00 $ 15.00 $ 42.00 940 5526 SPREADER BAR (KIT) 8" X 14' $ 11.00 $ 28.00 $ 70.00 940 5528 SPREADER BAR (KIT) 8" X 15' $ 16.00 $ 25.00 $ 98.00 940 5530 SPREADER BAR (KIT) 8" X 16' $ 9.00 $ 25.00 $ 73.00 940 5532 SPREADER BAR (KIT) 8" X 17' $ 8.00 $ 23.00 $ 65.00 940 5534 SPREADER BAR (KIT) 8" X 18' $ 9.00 $ 53.00 $ 74.00 940 5538 SPREADER BAR (KIT) 8" X 20' $ 10.00 $ 40.00 $ 85.00 940 5540 SPREADER BAR (KIT) 8" X 22' $ 10.00 $ 33.00 $ 132.00 940 5545 SPREADER BAR (KIT) 8" X 24' $ 10.00 $ 31.00 $ 93.00 940 5652 5" SPREADER BAR (LINEAR FEET) $ 3.00 $ 6.00 $ 15.00 940 5653 6" SPREADER BAR (LINEAR FEET) $ 4.00 $ 7.00 $ 18.00 940 5655 8" SPREADER BAR (LINEAR FEET) $ 7.00 $ 13.00 $ 26.00 940 5700 SPREADER BAR TRANSIT RACK $ 6.00 $ 13.00 $ 35.00 940 6040 17"-27" CYLINDER ASSEMBLY $ 23.00 $ 41.00 $ 100.00 940 6070 22"-36" CYLINDER ASSEMBLY $ 23.00 $ 41.00 $ 100.00 940 6077 28"-46" CYLINDER ASSEMBLY $ 23.00 $ 41.00 $ 100.00 940 6120 34"-55" CYLINDER ASSEMBLY $ 23.00 $ 41.00 $ 100.00 940 6124 40"-64" CYLINDER ASSEMBLY $ 27.00 $ 60.00 $ 125.00 940 6128 42"-69" CYLINDER ASSEMBLY $ 27.00 $ 60.00 $ 125.00 940 6170 52"-88" CYLINDER ASSEMBLY $ 27.00 $ 60.00 $ 125.00 940 6220 28"-46" CYLINDER ASSEMBLY $ 23.00 $ 41.00 $ 100.00 940 6847 RELEASE TOOL 30" $ 9.00 $ 21.00 $ 52.00
940 6850 RELEASE TOOL 48" $ 11.00 $ 26.00 $ 63.00
940 6851 MANHOLE BRACE RELEASE TOOL 48IN $ 11.00 $ 26.00 $ 44.00 940 6855 MANHOLE BRACE RELEASE TOOL 96IN $ 11.00 $ 26.00 $ 63.00 940 6900 RELEASE TOOL 72" $ 11.00 $ 26.00 $ 63.00
940 6902 RELEASE TOOL 96" $ 17.00 $ 29.00 $ 86.00
940 6907 REMOVAL HOOK 30" $ 6.00 $ 18.00 $ 52.00
940 6910 REMOVAL HOOK 48" $ 6.00 $ 18.00 $ 52.00
940 6916 REMOVAL HOOK 96" $ 17.00 $ 29.00 $ 86.00
#4..
- 305 -
940 6928 MANIFOLD HOSE BRIDLE 4-WAY $ 18.00 $ 42.00 $ 103.00 940 6950 SHORING PUMP HAND $ 42.00 $ 98.00 $ 216.00
940 6953 POLYETHYLENE FIN BOARD 4' X 8' $ 20.00 $ 42.00 $ 98.00 940 6956 SHORING PUMP 12 VOLT ELECTRIC $ 25.00 $ 293.00 $ 720.00 940 6960 FIN BOARD 4' X 8' $ 15.00 $ 37.00 $ 91.00
940 6961 FIN BOARD 4' X 4' $ 13.00 $ 34.00 $ 81.00
940 6964 FIN BOARD 4' X 12' $ 18.00 $ 43.00 $ 109.00
940 6974 CYLINDER EXTENSION 24" VERTICAL SHORE $ 4.00 $ 15.00 $ 37.00 940 6976 CYLINDER EXTENSION 42" VERTICAL SHORE $ 4.00 $ 15.00 $ 52.00 940 6978 CYLINDER EXTENSION 56" VERTICAL SHORE $ 4.00 $ 13.00 $ 67.00 940 6987 CYLINDER EXTENSION 90" VERTICAL SHORE $ 22.00 $ 58.00 $ 171.00 940 7019 10' WALER RAIL $ 19.00 $ 47.00 $ 109.00
940 7022 8' WALER RAIL $ 17.00 $ 44.00 $ 103.00
940 7024 6' WALER RAIL $ 34.00 $ 22.00 $ 111.00
940 7026 12' WALER RAIL $ 20.00 $ 49.00 $ 114.00
940 7029 16' WALER RAIL $ 22.00 $ 55.00 $ 120.00
940 7060 MANHOLE BRACE 3" CYLINDER ASSEMBLY $ 134.00 $ 312.00 $ 818.00 940 7062 MANHOLE BRACE CYL FOR 10" OVERSLEEVE $ 165.00 $ 363.00 $ 784.00 940 8005 MODULAR SHIELD PANEL 24" X 4' $ 17.00 $ 49.00 $ 111.00 940 8705 ADJUSTABLE SPREADER 24"-36" $ 9.00 $ 7.00 $ 18.00 940 8707 ADJUSTABLE SPREADER 28"-46" $ 9.00 $ 20.00 $ 56.00 940 8712 ADJUSTABLE SPREADER 36"-60" $ 15.00 $ 27.00 $ 83.00 940 8720 ADJUSTABLE SPREADER 52"-88" $ 15.00 $ 37.00 $ 91.00 940 8725 ADJUSTABLE SPREADER 72"-104" $ 6.00 $ 15.00 $ 44.00 940 8751 ADJUSTABLE SPREADER 76"-120" $ 10.00 $ 27.00 $ 70.00 940 9550 ADJUSTABLE SPREADERS $ 10.00 $ 26.00 $ 76.00
940 9560 LADDER HANGER FOR TRENCH SHIELD $ 9.00 $ 25.00 $ 73.00 940 9561 LADDER UPPER SECTION FOR TRENCH SHIELD $ 23.00 $ 50.00 $ 143.00 940 9563 6' LADDER EXTENSION FOR TRENCH SHIELD $ 14.00 $ 27.00 $ 57.00 940 9619 STACKING PIN FOR ALUMINUM BOX $ 3.00 $ 8.00 $ 24.00 940 9625 1' EXTENSION FOR ARCH SPREADER $ 19.00 $ 19.00 $ 87.00 940 9629 MODULAR SHIELD HIGH CLEARANCE ARCH $ 27.00 $ 106.00 $ 283.00 940 9630 ARCH SPREADER $ 162.00 $ 403.00 $ 1,044.00
940 9632 2' EXTENSION FOR ARCH SPREADER $ 27.00 $ 70.00 $ 178.00 940 9633 3' EXTENSION FOR ARCH SPREADER $ 31.00 $ 79.00 $ 195.00 940 9634 4' EXTENSION FOR ARCH SPREADER $ 34.00 $ 85.00 $ 215.00 940 9636 6' EXTENSION FOR ARCH SPREADER $ 36.00 $ 89.00 $ 272.00 940 9638 8' EXTENSION FOR ARCH SPREADER $ 38.00 $ 106.00 $ 300.00 940 9641 ARCH SPREADER A-1 SHORT $ 122.00 $ 358.00 $ 1,093.00 940 9718 ADJUSTABLE SPREADER 108" - 144" $ 24.00 $ 75.00 $ 224.00 940 9725 ADJUSTABLE SPREADER 60"-96" $ 4.00 $ 13.00 $ 30.00 940 9726 ADJUSTABLE SPREADER 74"-120" $ 40.00 $ 78.00 $ 180.00 940 9769 MODULAR SHIELD POST CORNER 24" $ 6.00 $ 14.00 $ 31.00 940 9774 MODULAR SHIELD POST CORNER 72" $ 12.00 $ 30.00 $ 77.00 940 9781 MODULAR SHIELD POST CORNER 120" $ 16.00 $ 46.00 $ 93.00 940 9782 MAPS ARCH TUBE EXTENSION 72" -96" $ 38.00 $ 94.00 $ 235.00 940 9783 MAPS ARCH TUBE EXTENSION 96"-120" $ 52.00 $ 132.00 $ 330.00 940 9785 MODULAR SHIELD STRUT 36" $ 8.00 $ 25.00 $ 49.00 940 9786 MODULAR SHIELD STRUT 48" $ 8.00 $ 26.00 $ 72.00 940 9787 MODULAR SHIELD STRUT 84" $ 13.00 $ 35.00 $ 89.00 940 9788 MODULAR SHIELD STRUT 60" $ 11.00 $ 33.00 $ 76.00 940 9789 MODULAR SHIELD STRUT 72" $ 12.00 $ 35.00 $ 83.00 940 9790 MODULAR SHIELD STRUT 96" $ 15.00 $ 38.00 $ 93.00 940 9794 STACKING PINS FOR MODULAR ALUMINUM BOX $ 4.00 $ 8.00 $ 21.00 940 9799 MAPS END SHIELD 6X6 W/40X40 NRC CUTOUT $ 98.00 $ 251.00 $ 642.00 940 9813 MODULAR SHIELD PANEL 24" X 3' $ 17.00 $ 44.00 $ 110.00 940 9814 MODULAR SHIELD PANEL 24" X 14' $ 36.00 $ 94.00 $ 215.00 940 9815 MODULAR SHIELD PANEL 24" X 5' $ 19.00 $ 48.00 $ 137.00 940 9816 MODULAR SHIELD PANEL 24" X 6' $ 24.00 $ 61.00 $ 154.00 940 9818 MODULAR SHIELD PANEL 24" X 8' $ 37.00 $ 84.00 $ 200.00 940 9819 MODULAR SHIELD PANEL 24" X 16' $ 66.00 $ 154.00 $ 358.00 940 9820 MODULAR SHIELD PANEL 24" X 10' $ 35.00 $ 90.00 $ 202.00 #4..
- 306 -
940 9821 MODULAR SHIELD PANEL 24" X 12' $ 37.00 $ 97.00 $ 221.00 940 9825 LIFTING EYES LITE SHIELD (4/SET) $ 4.00 $ 10.00 $ 26.00 940 9828 2' EXTENSION LEGS PACKAGE FOR BOXES $ 9.00 $ 30.00 $ 74.00 940 9832 6' MAPS TEE CONNECTOR $ 12.00 $ 23.00 $ 62.00
940 9843 BBC 120 CORNER END POST 120" $ 28.00 $ 94.00 $ 255.00 940 9844 SPLICE PANEL 2' BUILD A BOX $ 4.00 $ 10.00 $ 28.00 940 9845 2' EXTENSION LEGS PACKAGE FOR ALUM BOXES $ 27.00 $ 78.00 $ 207.00 940 9847 214 BBP BUILD A BOX PANEL 168" $ 65.00 $ 158.00 $ 438.00 940 9848 216 BBP BUILD A BOX PANEL 192" $ 55.00 $ 157.00 $ 449.00 940 9850 23 BBP BUILD A BOX PANEL 36" $ 18.00 $ 36.00 $ 117.00 940 9851 24 BBP BUILD A BOX PANEL 48" $ 19.00 $ 43.00 $ 130.00 940 9852 25 BBP BUILD A BOX PANEL 60" $ 20.00 $ 54.00 $ 146.00 940 9853 26 BBP BUILD A BOX PANEL 72" $ 21.00 $ 64.00 $ 163.00 940 9855 28 BBP BUILD A BOX PANEL 96" $ 24.00 $ 73.00 $ 185.00 940 9856 210 BBP BUILD A BOX PANEL 120" $ 28.00 $ 94.00 $ 255.00 940 9857 212 BBP BUILD A BOX PANEL 144" $ 35.00 $ 113.00 $ 283.00 940 9864 BBC 24 CORNER END POST 24" $ 12.00 $ 44.00 $ 131.00 940 9865 BBC 48 CORNER END POST 48" $ 19.00 $ 43.00 $ 130.00 940 9866 BBC 72 CORNER END POST 72" $ 21.00 $ 64.00 $ 163.00 940 9867 BBC 96 CORNER END POST 96" $ 21.00 $ 52.00 $ 122.00 940 9868 LIFTING LUGS FOR BUILD A BOX (EA $ 3.00 $ 7.00 $ 13.00 940 9870 T CORNER END POST 72" $ 24.00 $ 56.00 $ 136.00 940 9874 STACKING LUGS FOR BUILD A BOX $ 7.00 $ 18.00 $ 43.00 940 9877 T CORNER END POST 96" $ 34.00 $ 89.00 $ 247.00 940 9892 MAPS ARCH TUBE EXTENSION 60" - 84" $ 27.00 $ 62.00 $ 136.00 940 9898 ARCH EXTENSION 5' BUILD A BOX $ 69.00 $ 182.00 $ 467.00 940 9901 6' BAB SHEETING FRAME $ 36.00 $ 112.00 $ 319.00 940 9902 8' BAB SHEETING FRAME $ 47.00 $ 127.00 $ 343.00 940 9903 10' BAB SHEETING FRAME $ 57.00 $ 151.00 $ 427.00 940 9908 8' BAB ALUMINUM SHEETING $ 18.00 $ 54.00 $ 141.00 940 9909 10' BAB ALUMINUM SHEETING $ 20.00 $ 58.00 $ 147.00 941 8008 2' LEG KIT FOR MANGUARD (4/KIT) $ 29.00 $ 83.00 $ 246.00 941 8009 STACKING PIN FOR MANGUARD $ 6.00 $ 14.00 $ 33.00 941 8010 MANHOLE SHIELD ROUND 4' X 8' $ 112.00 $ 288.00 $ 724.00 941 8011 MANHOLE SHIELD ROUND 4' X 10' $ 118.00 $ 348.00 $ 871.00 941 8012 MANHOLE SHIELD ROUND 8' X 6' $ 125.00 $ 297.00 $ 737.00 941 8013 MANHOLE SHIELD ROUND 8' X 8.5' $ 166.00 $ 405.00 $ 1,106.00 941 8014 MANHOLE SHIELD ROUND 8' X 8.5' W/CUT OUT $ 191.00 $ 474.00 $ 1,180.00 941 8016 MANHOLE SHIELD ROUND 8' X 10' W/ CUT OUT $ 233.00 $ 572.00 $ 1,437.00 941 8024 MANHOLE BOX 4' X 8' OCTAGON $ 85.00 $ 313.00 $ 975.00 941 8026 MANHOLE BOX 4' X 12' OCTAGON $ 162.00 $ 403.00 $ 1,004.00 941 8028 MANHOLE BOX 8' X 8' OCTAGON $ 176.00 $ 453.00 $ 1,275.00 941 8029 MANHOLE BOX 8' X 10' OCTAGON $ 196.00 $ 502.00 $ 1,484.00 941 8030 MANHOLE BOX 8' X 12' OCTAGON $ 303.00 $ 756.00 $ 1,891.00 941 8033 MANHOLE BOX 4' X 8' $ 110.00 $ 260.00 $ 640.00 941 8035 MANHOLE BOX 4' X 10' $ 117.00 $ 310.00 $ 827.00 941 8037 MANHOLE BOX 4' X 12' $ 106.00 $ 342.00 $ 961.00 941 8041 MANHOLE BOX 8' X 8' $ 134.00 $ 474.00 $ 1,389.00 941 8042 MANHOLE BOX 8' X 8' WITH CUT OUT $ 176.00 $ 467.00 $ 1,399.00 941 8043 MANHOLE BOX 8' X 10' $ 203.00 $ 538.00 $ 1,610.00 941 8044 MANHOLE BOX 8' X 10' WITH CUT OUT $ 203.00 $ 538.00 $ 1,610.00 941 8045 MANHOLE BOX 8' X 12' $ 318.00 $ 795.00 $ 1,987.00 941 8046 MANHOLE BOX 8' X 12' WITH CUT OUT $ 318.00 $ 795.00 $ 1,987.00 941 8100 SPREADER BAR PIN 8" $ 3.00 $ 5.00 $ 12.00
941 8101 SPREADER BAR PIN 10" $ 10.00 $ 15.00 $ 28.00
941 8102 SPREADER BAR PIN 12" $ 10.00 $ 15.00 $ 28.00
941 8103 STACKING PINS FOR STEEL BOXES $ 6.00 $ 14.00 $ 33.00 941 8110 PIT KIT COLLAR CONNECTOR (SET OF 4) $ 267.00 $ 825.00 $ 1,631.00 941 8204 TRENCH BOX 4' X 8' (4" WALL) $ 100.00 $ 309.00 $ 781.00 941 8207 TRENCH BOX 4' X 10' (4" WALL) $ 154.00 $ 395.00 $ 1,017.00 941 8210 TRENCH BOX 4' X 12' (4" WALL) $ 160.00 $ 404.00 $ 1,041.00 941 8223 TRENCH BOX 4' X 16' (4" WALL) $ 193.00 $ 516.00 $ 1,357.00 #4..
- 307 -
941 8241 TRENCH BOX 4' X 20' (4" WALL) $ 230.00 $ 586.00 $ 1,629.00 941 8244 TRENCH BOX 4' X 20' (6" WALL) $ 230.00 $ 586.00 $ 1,629.00 941 8250 TRENCH BOX 4' X 22' (4" WALL) $ 169.00 $ 421.00 $ 1,052.00 941 8259 TRENCH BOX 4' X 24' (4" WALL) $ 234.00 $ 590.00 $ 1,693.00 941 8262 TRENCH BOX 4' X 24' (6" WALL) $ 234.00 $ 590.00 $ 1,693.00 941 8277 TRENCH BOX 4' X 28' (8" WALL) $ 333.00 $ 826.00 $ 2,064.00 941 8280 TRENCH BOX 4' X 32' (8" WALL) $ 321.00 $ 802.00 $ 2,003.00 941 8300 TRENCH BOX 6' X 6' (3" WALL) $ 166.00 $ 408.00 $ 1,131.00 941 8304 TRENCH BOX 6' X 8' (4" WALL) $ 160.00 $ 395.00 $ 1,097.00 941 8307 TRENCH BOX 6' X 10' (4" WALL) $ 186.00 $ 491.00 $ 1,454.00 941 8310 TRENCH BOX 6' X 12' (4" WALL) $ 166.00 $ 465.00 $ 1,385.00 941 8319 TRENCH BOX 6' X 16' (4" WALL) $ 215.00 $ 554.00 $ 1,647.00 941 8337 TRENCH BOX 6' X 20' (4" WALL) $ 272.00 $ 676.00 $ 2,021.00 941 8355 TRENCH BOX 6' X 24' (4" WALL) $ 272.00 $ 671.00 $ 2,008.00 941 8358 TRENCH BOX 6' X 24' (6" WALL) $ 278.00 $ 691.00 $ 2,065.00 941 8409 TRENCH BOX 8' X 8' (4" FB) $ 244.00 $ 595.00 $ 1,488.00 941 8412 TRENCH BOX 8' X 10' (3" FB) $ 237.00 $ 589.00 $ 1,459.00 941 8415 TRENCH BOX 8' X 10' (4" FB) $ 262.00 $ 649.00 $ 1,611.00 941 8418 TRENCH BOX 8' X 12' (4" FB) $ 273.00 $ 679.00 $ 1,680.00 941 8419 TRENCH BOX 8' X 12' (4" SKE) $ 273.00 $ 679.00 $ 1,680.00 941 8420 TRENCH BOX 8' X 12' (4" KE) $ 273.00 $ 679.00 $ 1,680.00 941 8422 TRENCH BOX 8' X 12' (6" FB) $ 273.00 $ 679.00 $ 1,680.00 941 8424 TRENCH BOX 8' X 12' (6" KE) $ 273.00 $ 679.00 $ 1,680.00 941 8425 TRENCH BOX 8' X 14' (4" FB) $ 279.00 $ 688.00 $ 1,704.00 941 8427 TRENCH BOX 8' X 14' (4" W/ CUT OUT) $ 279.00 $ 688.00 $ 1,704.00 941 8431 TRENCH BOX 8' X 16' (4" FB) $ 357.00 $ 843.00 $ 2,094.00 941 8432 TRENCH BOX 8' X 16' (4" SKE) $ 357.00 $ 843.00 $ 2,094.00 941 8433 TRENCH BOX 8' X 16' (4" KE) $ 357.00 $ 843.00 $ 2,094.00 941 8434 TRENCH BOX 8' X 16' (4" W/ CUT OUT) $ 357.00 $ 843.00 $ 2,094.00 941 8435 TRENCH BOX 8' X 16' (6" FB) $ 429.00 $ 1,074.00 $ 2,566.00 941 8436 TRENCH BOX 8' X 16' (6" SKE) $ 357.00 $ 843.00 $ 2,094.00 941 8437 TRENCH BOX 8' X 16' (6" KE) $ 357.00 $ 843.00 $ 2,094.00 941 8441 TRENCH BOX 8' X 18' (4" FB) $ 427.00 $ 954.00 $ 2,218.00 941 8450 TRENCH BOX 8' X 20' (4" FB) $ 444.00 $ 987.00 $ 2,325.00 941 8451 TRENCH BOX 8' X 20' (4" SKE) $ 444.00 $ 987.00 $ 2,325.00 941 8452 TRENCH BOX 8' X 20' (4" KE) $ 444.00 $ 987.00 $ 2,325.00 941 8453 TRENCH BOX 8' X 20' (6" FB) $ 444.00 $ 987.00 $ 2,325.00 941 8454 TRENCH BOX 8' X 20' (6" SKE) $ 444.00 $ 987.00 $ 2,325.00 941 8455 TRENCH BOX 8' X 20' (6" KE) $ 444.00 $ 987.00 $ 2,325.00 941 8456 TRENCH BOX 8' X 20' (8" FB) $ 444.00 $ 987.00 $ 2,325.00 941 8457 TRENCH BOX 8' X 20' (8" SKE) $ 444.00 $ 987.00 $ 2,325.00 941 8458 TRENCH BOX 8' X 20' (8" KE) $ 444.00 $ 987.00 $ 2,325.00 941 8459 TRENCH BOX 8' X 22' (4" FB) $ 272.00 $ 680.00 $ 1,700.00 941 8468 TRENCH BOX 8' X 24' (4" FB) $ 457.00 $ 1,074.00 $ 2,677.00 941 8469 TRENCH BOX 8' X 24' (4" SKE) $ 457.00 $ 1,074.00 $ 2,677.00 941 8470 TRENCH BOX 8' X 24' (4" KE) $ 457.00 $ 1,074.00 $ 2,677.00 941 8471 TRENCH BOX 8' X 24' (6" FB) $ 457.00 $ 1,074.00 $ 2,677.00 941 8472 TRENCH BOX 8' X 24' (6" SKE) $ 457.00 $ 1,074.00 $ 2,677.00 941 8473 TRENCH BOX 8' X 24' (6" KE) $ 457.00 $ 1,074.00 $ 2,677.00 941 8474 TRENCH BOX 8' X 24' (8" FB) $ 457.00 $ 1,074.00 $ 2,677.00 941 8475 TRENCH BOX 8' X 24' (8" SKE) $ 457.00 $ 1,074.00 $ 2,677.00 941 8476 TRENCH BOX 8' X 24' (8" KE) $ 457.00 $ 1,074.00 $ 2,677.00 941 8487 TRENCH BOX 8' X 28' (6" SKE) $ 463.00 $ 1,122.00 $ 3,727.00 941 8490 TRENCH BOX 8' X 28' (8" SKE) $ 463.00 $ 1,122.00 $ 3,727.00 941 8495 TRENCH BOX 8' X 30' $ 552.00 $ 1,333.00 $ 3,732.00 941 8510 TRENCH BOX 10' X 10' (4" FB) $ 355.00 $ 845.00 $ 2,166.00 941 8511 TRENCH BOX 10' X 10' (4" SKE) $ 355.00 $ 845.00 $ 2,166.00 941 8512 TRENCH BOX 10' X 10' (4" KE) $ 355.00 $ 845.00 $ 2,166.00 941 8515 TRENCH BOX 10' X 12' (4" FB) $ 359.00 $ 873.00 $ 2,180.00 941 8516 TRENCH BOX 10' X 12' (4" SKE) $ 359.00 $ 873.00 $ 2,180.00 941 8518 TRENCH BOX 10' X 12' (6" FB) $ 359.00 $ 873.00 $ 2,180.00 941 8527 TRENCH BOX 10' X 16' (4" FB) $ 417.00 $ 1,060.00 $ 2,590.00 #4..
- 308 -
941 8528 TRENCH BOX 10' X 16' (4" SKE) $ 417.00 $ 1,060.00 $ 2,590.00 941 8529 TRENCH BOX 10' X 16' (4" KE) $ 417.00 $ 1,060.00 $ 2,590.00 941 8530 TRENCH BOX 10' X 16' (6" FB) $ 417.00 $ 1,060.00 $ 2,590.00 941 8531 TRENCH BOX 10' X 16' (6" SKE) $ 417.00 $ 1,060.00 $ 2,590.00 941 8532 TRENCH BOX 10' X 16' (6" KE) $ 417.00 $ 1,060.00 $ 2,590.00 941 8545 TRENCH BOX 10' X 20' (4" FB) $ 484.00 $ 1,174.00 $ 2,924.00 941 8548 TRENCH BOX 10' X 20' (6" FB) $ 484.00 $ 1,174.00 $ 2,924.00 941 8549 TRENCH BOX 10' X 20' (6" SKE) $ 484.00 $ 1,174.00 $ 2,924.00 941 8550 TRENCH BOX 10' X 20' (6" KE) $ 484.00 $ 1,174.00 $ 2,924.00 941 8552 TRENCH BOX 10' X 20' (8" SKE) $ 484.00 $ 1,174.00 $ 2,924.00 941 8557 TRENCH BOX 10' X 22' (6" FB) $ 391.00 $ 975.00 $ 2,436.00 941 8563 TRENCH BOX 10' X 24' (4" FB) $ 522.00 $ 1,333.00 $ 3,199.00 941 8566 TRENCH BOX 10' X 24' (6" FB) $ 522.00 $ 1,333.00 $ 3,199.00 941 8567 TRENCH BOX 10' X 24' (6" SKE) $ 522.00 $ 1,333.00 $ 3,199.00 941 8568 TRENCH BOX 10' X 24' (6" KE) $ 522.00 $ 1,333.00 $ 3,199.00 941 8569 TRENCH BOX 10' X 24' (8" FB) $ 522.00 $ 1,333.00 $ 3,199.00 941 8570 TRENCH BOX 10' X 24' (8" SKE) $ 522.00 $ 1,333.00 $ 3,199.00 941 8573 TRENCH BOX 10' X 24' (8" KE) $ 522.00 $ 1,333.00 $ 3,199.00 941 8581 TRENCH BOX 10' X 28' (8" FB) $ 605.00 $ 1,448.00 $ 3,280.00 941 8593 TRENCH BOX 10' X 32' $ 648.00 $ 1,618.00 $ 4,046.00 941 9025 TAPPING BOX STACKER 4' X 8' X 8' $ 104.00 $ 247.00 $ 609.00 941 9705 BEDDING BOX 5 YARD $ 255.00 $ 587.00 $ 1,465.00 941 9707 BEDDING BOX 7 YARD $ 348.00 $ 617.00 $ 1,893.00 941 9709 BEDDING BOX 9 YARD $ 365.00 $ 908.00 $ 2,173.00 941 9710 BEDDING BOX 9 YARD HEAVY DUTY $ 365.00 $ 908.00 $ 2,173.00 941 9713 BEDDING BOX 12 YARD HEAVY DUTY $ 346.00 $ 862.00 $ 2,458.00 942 1000 KIT:1.5' SHORE 17-27" CYL $ 19.00 $ 25.00 $ 58.00 942 1010 KIT:1.5' SHORE 22-36" CYL $ 20.00 $ 26.00 $ 76.00 942 1020 KIT:1.5' SHORE 28-46" CYL $ 22.00 $ 35.00 $ 90.00 942 1030 KIT:1.5' SHORE 34-55" CYL $ 23.00 $ 41.00 $ 100.00 942 1040 KIT:1.5' SHORE 40-64" CYL $ 25.00 $ 48.00 $ 119.00 942 1050 KIT:1.5' SHORE 42-69" CYL $ 24.00 $ 49.00 $ 130.00 942 1060 KIT:1.5' SHORE 52-88" CYL $ 27.00 $ 60.00 $ 125.00 942 1080 KIT:2' SHORE 17-27" CYL $ 17.00 $ 22.00 $ 51.00 942 1090 KIT:2' SHORE 22-36" CYL $ 17.00 $ 22.00 $ 65.00 942 1110 KIT:2' SHORE 28-46" CYL $ 17.00 $ 31.00 $ 80.00 942 1130 KIT:2' SHORE 40-64" CYL $ 18.00 $ 43.00 $ 104.00 942 1140 KIT:2' SHORE 52-88" CYL $ 27.00 $ 60.00 $ 125.00 942 1160 KIT:3.5' SHORE 22-36" CYL $ 22.00 $ 50.00 $ 128.00 942 1170 KIT:3.5' SHORE 17-27" CYL $ 23.00 $ 54.00 $ 135.00 942 1190 KIT:3.5' SHORE 34-55" CYL $ 35.00 $ 80.00 $ 194.00 942 1200 KIT:3.5' SHORE 40-64" CYL $ 35.00 $ 85.00 $ 213.00 942 1220 KIT:3.5' SHORE 28-46" CYL $ 28.00 $ 73.00 $ 173.00 942 1230 KIT:3.5' SHORE 52-88" CYL $ 35.00 $ 85.00 $ 213.00 942 1240 KIT:5' SHORE 17-27" CYL $ 23.00 $ 55.00 $ 140.00 942 1250 KIT:5' SHORE 22-36" CYL $ 23.00 $ 55.00 $ 139.00 942 1270 KIT:5' SHORE 34-55" CYL $ 34.00 $ 77.00 $ 189.00 942 1280 KIT:5' SHORE 40-64" CYL $ 34.00 $ 83.00 $ 208.00 942 1300 KIT:5' SHORE 52-88" CYL $ 35.00 $ 85.00 $ 213.00 942 1310 KIT:5' SHORE 28-46" CYL $ 35.00 $ 91.00 $ 216.00 942 1320 KIT:7' SHORE 28-46" CYL $ 27.00 $ 68.00 $ 165.00 942 1330 KIT:7' SHORE 22-36" CYL $ 24.00 $ 56.00 $ 143.00 942 1340 KIT:7' SHORE 17-27" CYL $ 22.00 $ 51.00 $ 132.00 942 1360 KIT:7' SHORE 34-55" CYL $ 35.00 $ 80.00 $ 194.00 942 1370 KIT:7' SHORE 40-64" CYL $ 35.00 $ 85.00 $ 213.00 942 1390 KIT:7' SHORE 52-88" CYL $ 35.00 $ 85.00 $ 213.00 942 6675 TRENCH BOX ALUMINUM 6' X 10' $ 252.00 $ 629.00 $ 1,567.00 942 6779 SHIELD HYDRAULIC 6' X 8' $ 246.00 $ 598.00 $ 1,678.00 942 6780 SHIELD HYDRAULIC 6' X 6' $ 216.00 $ 538.00 $ 1,333.00 942 6781 SHIELD HYDRAULIC 8' X 8' $ 267.00 $ 668.00 $ 1,645.00 942 6783 SHIELD HYDRAULIC 8' X 10' $ 265.00 $ 660.00 $ 1,962.00 942 6785 SHIELD HYDRAULIC 8' X 12' $ 296.00 $ 756.00 $ 2,115.00 #4..
- 309 -
942 6815 SHIELD ALUMINUM 4' X 8' $ 123.00 $ 430.00 $ 1,074.00 942 6819 TRENCH BOX ALUMINUM 4' X 12' $ 123.00 $ 438.00 $ 1,087.00 942 6820 TRENCH BOX ALUM 4' X 12' W/STEEL FRAME $ 149.00 $ 444.00 $ 1,324.00 942 6825 TRENCH BOX ALUM 6' X 6' $ 198.00 $ 493.00 $ 1,235.00 942 6835 TRENCH BOX ALUM 8' X 8' W/STEEL FRAME $ 166.00 $ 497.00 $ 1,482.00 942 6838 TRENCH BOX ALUM 8' X 10' W/STEEL FRAME $ 193.00 $ 573.00 $ 1,714.00 942 6840 TRENCH BOX ALUM 8' X 12' W/STEEL FRAME $ 244.00 $ 719.00 $ 2,054.00 942 6842 TRENCH BOX ALUM 8' X 14' W/STEEL FRAME $ 316.00 $ 784.00 $ 2,109.00 942 6844 TRENCH BOX ALUM 8' X 16' W/STEEL FRAME $ 362.00 $ 886.00 $ 2,210.00 942 8268 END MEMBER 2' $ 4.00 $ 16.00 $ 23.00
942 8270 END MEMBER 4' $ 4.00 $ 13.00 $ 31.00
942 8272 END MEMBER 6' $ 5.00 $ 15.00 $ 40.00
942 8274 END MEMBER 12' $ 13.00 $ 31.00 $ 84.00
942 8276 END MEMBER 8' $ 7.00 $ 20.00 $ 51.00
942 8277 END MEMBER 10' $ 8.00 $ 27.00 $ 64.00
942 8286 END SHORE 5' $ 43.00 $ 123.00 $ 303.00
942 8324 END SHORE 6' $ 142.00 $ 364.00 $ 849.00
942 8325 END SHORE 8' $ 146.00 $ 379.00 $ 993.00
942 8330 SPEED STRUT MOD 40 (26"-40") $ 4.00 $ 9.00 $ 25.00 942 8334 SPEED STRUT MOD 50 (32"-50") $ 4.00 $ 9.00 $ 24.00 942 8336 SPEED STRUT MOD 59 (38"-59") $ 4.00 $ 9.00 $ 26.00 942 8340 SPEED STRUT MOD 68 (44"-68") HYDRAULIC $ 5.00 $ 10.00 $ 27.00 942 8344 SPEED STRUT MOD 92 (56"-92") $ 4.00 $ 9.00 $ 25.00 942 8348 ADJUSTABLE SPREADER 26"-36" $ 7.00 $ 18.00 $ 133.00 942 8350 ADJUSTABLE SPREADER 27"-36" $ 27.00 $ 57.00 $ 141.00 942 8351 ADJUSTABLE SPREADER 35"-48" $ 29.00 $ 45.00 $ 154.00 942 8352 ADJUSTABLE SPREADER 32"-48" $ 11.00 $ 15.00 $ 54.00 942 8354 ADJUSTABLE SPREADER 52"-84" $ 16.00 $ 48.00 $ 141.00 942 8356 ADJUSTABLE SPREADER 40"-60" $ 8.00 $ 22.00 $ 65.00 942 8360 ADJUSTABLE SPREADER 48"-72" $ 7.00 $ 17.00 $ 61.00 942 8388 ADJUSTABLE STRUTS 56"-92" STATIC $ 28.00 $ 84.00 $ 251.00 942 9084 TRENCH BOX ALUMINUM 8' X 8' $ 268.00 $ 664.00 $ 1,632.00 942 9092 TRENCH BOX ALUMINUM 8' X 10' $ 279.00 $ 695.00 $ 2,062.00 942 9111 TRENCH BOX ALUMINUM 8' X 12' $ 300.00 $ 773.00 $ 2,142.00 942 9116 TRENCH BOX ALUMINUM 8' X 14' $ 328.00 $ 801.00 $ 2,325.00 942 9257 TRENCH BOX ALUMINUM 6' X 8' $ 215.00 $ 526.00 $ 1,477.00 942 9266 TRENCH BOX ALUMINUM 6' X 12' $ 183.00 $ 541.00 $ 1,634.00 942 9273 TRENCH BOX ALUMINUM 10' X 10' $ 201.00 $ 592.00 $ 1,766.00 942 9277 TRENCH BOX ALUMINUM 10' X 12' $ 260.00 $ 779.00 $ 2,241.00 942 9310 TRENCH BOX ALUMINUM 8' X 16' $ 350.00 $ 845.00 $ 2,441.00 942 9315 TRENCH BOX ALUMINUM 8' X 6' $ 190.00 $ 485.00 $ 1,211.00 942 9435 PANEL SHIELD ALUMINUM 6' X 16' $ 343.00 $ 845.00 $ 2,106.00 943 4133 TRENCH SHIELD SHEETING GUIDE 16' $ 193.00 $ 535.00 $ 1,556.00 943 4134 TRENCH SHIELD SHEETING GUIDE 20' $ 378.00 $ 934.00 $ 2,336.00 943 4138 TRENCH SHIELD SHEETING CORNER 6' $ 90.00 $ 260.00 $ 759.00 943 5675 TIE BACK STRUT CONNECTOR $ 59.00 $ 169.00 $ 492.00 944 9801 EXIT GRID RAMP $ 39.00 $ 92.00 $ 266.00
944 9820 ROAD PLATE 4' X 16' $ 52.00 $ 128.00 $ 317.00
944 9825 ROAD PLATE 4' X 20' $ 64.00 $ 155.00 $ 386.00
944 9840 ROAD PLATE 8' X 15' $ 89.00 $ 205.00 $ 493.00
944 9891 GROUND RELEASE SHACKLE $ 22.00 $ 65.00 $ 195.00 944 9892 LIFTING TOOL CROSSING PLATE $ 8.00 $ 23.00 $ 57.00 944 9893 LIFTING DEVICE $ 5.00 $ 18.00 $ 87.00
944 9894 LIFTING RING SWIVEL 1.25" $ 6.00 $ 20.00 $ 59.00 944 9895 CROSSING PLATE LIFT SCREW 1.25" $ 7.00 $ 18.00 $ 52.00 944 9897 PLATE LIFTING RING STANDARD $ 5.00 $ 18.00 $ 51.00 944 9909 ROAD PLATE 4' X 12' $ 48.00 $ 120.00 $ 357.00
944 9914 ROAD PLATE 4' X 8' $ 42.00 $ 110.00 $ 266.00
944 9917 ROAD PLATE 4' X 10' $ 42.00 $ 112.00 $ 271.00
944 9920 ROAD PLATE 5' X 8' $ 50.00 $ 141.00 $ 354.00
944 9921 TREAD CLEANING PLATE 8' X 12' $ 49.00 $ 114.00 $ 331.00 944 9924 ROAD PLATE 5' X 10' $ 52.00 $ 150.00 $ 366.00
#4..
- 310 -
944 9926 ROAD PLATE 5' X 12' $ 60.00 $ 151.00 $ 373.00
944 9928 ROAD PLATE 6' X 8' $ 59.00 $ 150.00 $ 381.00
944 9930 ROAD PLATE 6' X 10' $ 64.00 $ 157.00 $ 393.00
944 9932 ROAD PLATE 6' X 12' $ 64.00 $ 159.00 $ 391.00
944 9935 ROAD PLATE 6' X 16' $ 90.00 $ 247.00 $ 693.00
944 9937 ROAD PLATE 8' X 16' X 1 1/2" $ 58.00 $ 172.00 $ 513.00 944 9940 ROAD PLATE 8' X 8' $ 71.00 $ 164.00 $ 456.00
944 9941 ROAD PLATE 8' X 14' $ 67.00 $ 169.00 $ 422.00
944 9942 ROAD PLATE 8' X 10' $ 76.00 $ 169.00 $ 470.00
944 9943 ROAD PLATE 8' X 12' $ 78.00 $ 183.00 $ 477.00
944 9944 ROAD PLATE 8' X 16' $ 82.00 $ 201.00 $ 503.00
944 9945 ROAD PLATE 8' X 15' X 1" $ 82.00 $ 201.00 $ 503.00 944 9946 ROAD PLATE 8' X 20' $ 88.00 $ 215.00 $ 535.00
944 9956 TREAD CLEANING PLATE 8' X 10' $ 115.00 $ 229.00 $ 456.00 944 9958 ROAD PLATE 6' X 20' $ 82.00 $ 201.00 $ 499.00
944 9961 MANHOLE VACUUM TEST PUMP $ 85.00 $ 203.00 $ 707.00 944 9965 MANHOLE VACUUM TEST COVER 24"-30" $ 75.00 $ 219.00 $ 654.00 944 9967 MANHOLE VACUUM TEST COVER 30"-36" $ 75.00 $ 262.00 $ 783.00 944 9972 MANHOLE TESTER 24" COMPLETE $ 204.00 $ 481.00 $ 1,160.00 944 9974 MANHOLE TESTER 38" COMPLETE $ 80.00 $ 242.00 $ 1,399.00 944 9976 MANHOLE TESTER 38" WITHOUT PUMP $ 65.00 $ 188.00 $ 580.00 944 9991 PEL-GUARD MANHOLE GUARD $ 54.00 $ 106.00 $ 325.00 950 2086 TRUCK PICKUP 1 TON 4X4 CREW CAB $ 291.00 $ 815.00 $ 1,697.00 950 2210 TRUCK PU 1/2 TON ELE PRO STD $ 672.00 $ 1,222.00 $ 2,443.00 950 2211 TRUCK PU 1/2 TON ELE PRO EXT $ 790.00 $ 1,436.00 $ 2,872.00 950 2215 TRUCK PU 1/2 TON ELE XLT EXT $ 981.00 $ 1,783.00 $ 3,566.00 950 2220 TRUCK PU 1/2 TON ELE PREM EXT $ 1,177.00 $ 2,141.00 $ 4,281.00 950 2240 TRUCK PICKUP 1/2 TON 4X2 CREW CAB $ 214.00 $ 654.00 $ 1,285.00 950 2245 TRUCK PICKUP 1/2 TON XL 4X4 CREW CAB $ 214.00 $ 654.00 $ 1,285.00 950 2246 TRUCK PICKUP 1/2 TON XLT 4X4 CREW CAB $ 226.00 $ 688.00 $ 1,392.00 950 2250 TRUCK PICKUP 1/2 TON 4X2 $ 214.00 $ 654.00 $ 1,285.00 950 2255 TRUCK PICKUP 1/2 TON 4X2 EXT CAB $ 214.00 $ 654.00 $ 1,285.00 950 2265 TRUCK PICKUP 1/2 TON 4X4 EXT CAB $ 214.00 $ 654.00 $ 1,285.00 950 2275 TRUCK PICKUP 3/4 TON 4X4 $ 231.00 $ 726.00 $ 1,497.00 950 2276 TRUCK PICKUP 3/4 TON 4X2 $ 231.00 $ 726.00 $ 1,497.00 950 2280 TRUCK PICKUP 3/4 TON 4X4 EXT CAB $ 248.00 $ 780.00 $ 1,607.00 950 2295 TRUCK PICKUP 3/4 TON 4X4 XL CREW CAB $ 248.00 $ 780.00 $ 1,607.00 950 2296 TRUCK PICKUP 3/4 TON 4X4 XLT CREW CAB $ 253.00 $ 785.00 $ 1,675.00 950 2910 PLOW FOR PICKUP TRUCK $ 119.00 $ 300.00 $ 750.00 950 2950 SALT SPREADER BOX FOR TRUCK $ 144.00 $ 360.00 $ 900.00 950 2955 TAILGATE SALT SPREADER FOR PICK-UP $ 97.00 $ 243.00 $ 606.00 950 9960 TRAILER RECEIVER HITCH & BALL $ 10.00 $ 23.00 $ 42.00 951 5999 TRUCK 14 TON ARTICULATED END DUMP $ 1,366.00 $ 4,152.00 $ 7,128.00 951 6005 TRUCK 30 TON ARTICULATED END DUMP $ 2,034.00 $ 5,312.00 $ 12,197.00 952 2120 TRUCK STAKE 12' $ 272.00 $ 672.00 $ 1,672.00
952 2125 TRUCK STAKE 12' WITH LIFT GATE $ 280.00 $ 700.00 $ 1,766.00 952 2165 TRUCK STAKE 16' WITH LIFT GATE $ 220.00 $ 803.00 $ 2,344.00 952 2205 TRUCK STAKE 20' WITH LIFT GATE $ 249.00 $ 895.00 $ 2,352.00 952 2220 TRUCK STAKE 22' $ 344.00 $ 893.00 $ 2,294.00
952 2225 TRUCK STAKE 22' WITH LIFT GATE $ 367.00 $ 919.00 $ 2,330.00 952 2905 TRUCK PLOW FOR DUMP $ 69.00 $ 173.00 $ 432.00
952 7045 TRUCK DUMP 3 YARD $ 338.00 $ 950.00 $ 2,172.00 952 7050 TRUCK DUMP 5 YARD NON CDL $ 362.00 $ 983.00 $ 2,285.00 952 7055 TRUCK DUMP 5 YARD CDL $ 376.00 $ 983.00 $ 2,350.00 952 7075 TRUCK DUMP 10-14 YARD CDL $ 744.00 $ 1,809.00 $ 4,661.00 952 7220 TRUCK 16' FLATBED DUMP $ 373.00 $ 933.00 $ 2,354.00 953 2224 TRUCK WATER 2000-2999 GAL NON-CDL $ 431.00 $ 1,337.00 $ 2,935.00 953 2225 TRUCK WATER 2000-2999 GAL CDL $ 431.00 $ 1,337.00 $ 2,935.00 953 2227 TRUCK WATER 4000-4999 GAL $ 709.00 $ 2,017.00 $ 4,735.00 953 2370 VACUUM TRAILER 400-750 GALLON $ 624.00 $ 1,560.00 $ 4,430.00 953 2371 VACUUM TRAILER 751-1000 GALLON $ 702.00 $ 2,048.00 $ 4,682.00 954 4105 VAN CARGO 3/4 TON ELECTRIC $ 776.00 $ 1,410.00 $ 2,821.00 #4..
- 311 -
954 4100 VAN ECONOLINE $ 321.00 $ 810.00 $ 2,025.00
954 4110 VAN 15 PASSENGER $ 242.00 $ 710.00 $ 1,825.00
954 4300 TRUCK WITH SERVICE BODY $ 365.00 $ 1,060.00 $ 2,446.00 955 1000 GOLF CART ELECTRIC $ 99.00 $ 223.00 $ 508.00
955 1001 GOLF CART GAS $ 101.00 $ 224.00 $ 509.00
955 1005 INDUSTRIAL ELECTRIC CART 3 WHEELED $ 58.00 $ 150.00 $ 455.00 955 1110 INDUSTRIAL ELECTRIC CART 4 WHEELED $ 132.00 $ 267.00 $ 592.00 955 1112 INDUSTRIAL GAS CART 4 WHEEL $ 129.00 $ 267.00 $ 539.00 955 1115 UTV 2WD GAS 2SEAT CANOPY $ 129.00 $ 297.00 $ 625.00 955 1116 UTV 2WD GAS 4SEAT CANOPY $ 129.00 $ 297.00 $ 625.00 955 1117 UTV 2WD GAS 6SEAT CANOPY $ 129.00 $ 297.00 $ 625.00 955 1118 UTV 4WD GAS 4SEAT CAB $ 179.00 $ 360.00 $ 721.00 955 1119 UTV 4WD DSL 2SEAT ROPS $ 165.00 $ 354.00 $ 710.00 955 1120 UTV 4WD GAS 2SEAT ROPS $ 165.00 $ 354.00 $ 710.00 955 1121 UTV 4WD GAS 4SEAT ROPS $ 179.00 $ 360.00 $ 721.00 955 1122 UTV 4WD GAS 2SEAT CAB $ 165.00 $ 354.00 $ 710.00 955 1123 UTV 4WD DSL 4SEAT CAB $ 188.00 $ 395.00 $ 798.00 955 1124 UTV 4WD DSL 4SEAT ROPS $ 164.00 $ 378.00 $ 750.00 955 1125 UTV 4WD DSL W/TOOL ATTACH SYSTEM $ 183.00 $ 399.00 $ 1,918.00 955 1126 UTV 4WD DSL 2SEAT CAB $ 181.00 $ 358.00 $ 686.00 955 1140 UTV 2WD ELEC 4SEAT CANOPY $ 147.00 $ 312.00 $ 695.00 955 1150 UTV 2WD ELEC 2SEAT CANOPY $ 114.00 $ 259.00 $ 585.00 956 1033 BOOM 34-40' BUCKET TRUCK $ 547.00 $ 1,410.00 $ 3,857.00 956 1057 BOOM 55-60' BUCKET TRUCK $ 700.00 $ 1,899.00 $ 5,302.00 975 1180 WELDER ARC 180-189 AMP GAS $ 90.00 $ 225.00 $ 563.00 975 1225 WELDER ARC 225 AMP $ 100.00 $ 252.00 $ 630.00
975 1250 WELDER ARC 250 AMP GAS/DIESEL $ 100.00 $ 257.00 $ 643.00 975 1255 WELDER ARC 250 AMP LP GAS $ 100.00 $ 252.00 $ 553.00 #4..
- 312 -
975 1271 WELDER ARC 280 AMP INVERTER $ 52.00 $ 114.00 $ 272.00 975 1300 WELDER ARC 300 AMP GAS/DSL SKID MOUNTED $ 110.00 $ 267.00 $ 667.00 975 1350 WELDER ARC 300 AMP GAS/DIESEL TOWABLE $ 110.00 $ 261.00 $ 630.00 975 1356 WELDER ARC 350 AMP WCC INVERTER $ 111.00 $ 247.00 $ 589.00 975 1358 WELDER ARC 350 AMP CC/CV INVERTER $ 87.00 $ 192.00 $ 456.00 975 1360 WELDER ARC 350 AMP GAS/DIESEL PORTABLE $ 170.00 $ 428.00 $ 649.00 975 1399 WELDER ARC 400 AMP DIESEL DUAL OPERATOR $ 155.00 $ 351.00 $ 757.00 975 1400 WELDER ARC 400 AMP DIESEL $ 114.00 $ 272.00 $ 664.00 975 1450 WELDER ARC 450 AMP INVERTER $ 102.00 $ 229.00 $ 536.00 975 1500 WELDER ARC 500 AMP GAS/DIESEL $ 128.00 $ 296.00 $ 730.00 975 2017 WELDER LEAD 2/0 10' STINGER $ 12.00 $ 33.00 $ 62.00 975 2018 WELDER LEAD 2/0 10' GROUND $ 10.00 $ 31.00 $ 59.00 975 2050 WELDER LEAD 50' STINGER AND GROUND $ 24.00 $ 30.00 $ 54.00 975 2205 WELDER LEAD 50' EXTRA $ 20.00 $ 40.00 $ 76.00
975 2210 WELDER LEAD 100' EXTRA $ 15.00 $ 33.00 $ 80.00 975 2525 PLUG CANNON 60 AMP MALE $ 15.00 $ 36.00 $ 87.00 975 4560 KIT: 350AMP CC/CV INVERTER 4-PACK $ 229.00 $ 509.00 $ 1,212.00 975 5000 MIG WELDER WITH CONTROLS $ 81.00 $ 189.00 $ 449.00 975 7525 CUTTER PLASMA 7/8" CAPACITY $ 167.00 $ 373.00 $ 888.00 975 7530 CUTTER PLASMA 1" CAPACITY $ 314.00 $ 698.00 $ 1,664.00 #4..
- 313 -
Purple Highlighted DOES NOT include service and will require adding cat class 75- 2085
Green Highlighted would require 75-2070 for 1X Week / 4X Month Service
Blue Highlighted would require 75-2080 for 1X Week / 4X Month Service Orange Highlighted would require 75-2075 for 1X Week / 4X Month Service
**Standard Delivery during normal working hours**
Delivery/Pickup Charges = $154.27 flat charge (each way) then $4.19 per mile **After Hours, Weekends, and Holidays**
An additional call out fee may be incurred, and will be communicated at the time of request. Please refer to pricing table under Service/Labor for hourly rates that would be applicable to support the call out charges. **Third Party Hauling Charges**
In a situation where both parties mutually agree to utilize a third party hauler, a quote (cost + 10%) will be provided to the end user that would replace standard United Rentals Delivery and Pickup rates. **Oversize/Permitted Loads**
All applicable fees will be communicated at time of service. **Over Time Charges**
Rental Rates above are based on normal usage so run time in excess of single shift rates will incur overtime charges based on actual usage of the equipment.
**Truck Rental Allowance**
Rental rates for all vehicles with an odometer (categories 950 - 954) are based on a 2000 mile per 28 day monthly billing cylce. Calculated overages will incur a .22$ per mile charge thereafter. All electric vehicles require a minimum rental period of 12 month's.
**Rental Equipment Fuel Service**
A refueling service charge will be applied to all equipment returned less than full. The exact cost of the refueling service may vary depending on the rate being charged by the branch location on the date customer returns the equipment.
#4..
- 314 -
KDD
EdEZ
s/
t
ƚŽƚŚĞ
Z
Yh
^d &KZWZKWK^>;Z&WͿϬϲϮϯϮϬ
ŶƚŝƚůĞĚ
ƋƵŝƉŵĞŶƚZĞŶƚĂůǁŝƚŚZĞůĂƚĞĚ^ĞƌǀŝĐĞƐ
dŚĞĨŽůůŽǁŝŶŐĂĚǀĞƌƚŝƐĞŵĞŶƚǁĂƐƉůĂĐĞĚƉƌŝůϯϬ͕ϮϬϮϬŝŶhƚĂŚ͛ƐdŚĞ^Ăůƚ>ĂŬĞdƌŝďƵŶĞ͕ŝŶh^dŽĚĂLJ͕ŝŶ ^ŽƵƚŚĂƌŽůŝŶĂ͛ƐdŚĞ^ƚĂƚĞ͕ĂŶĚŽŶƚŚĞ^ŽƵƌĐĞǁĞůůǁĞďƐŝƚĞǁǁǁ͘ƐŽƵƌĐĞǁĞůůͲŵŶ͘ŐŽǀ͕^ŽƵƌĐĞǁĞůůWƌŽĐƵƌĞŵĞŶƚ WŽƌƚĂůŚƚƚƉƐ͗ͬͬƉƌŽƉŽƌƚĂů͘ƐŽƵƌĐĞǁĞůůͲŵŶ͘ŐŽǀ͕ŝĚĚŝŶŐŽ͕DĞƌdž͕dŚĞEĞǁzŽƌŬ^ƚĂƚĞŽŶƚƌĂĐƚZĞƉŽƌƚĞƌ ǁǁǁ͘ŶLJƐĐƌ͘ŶLJ͘ŐŽǀ͕ WƵďůŝĐWƵƌĐŚĂƐĞ͘ĐŽŵ͕ĂŶĚDĂLJϭ͕ϮϬϮϬŝŶKƌĞŐŽŶ͛ƐĂŝůLJ:ŽƵƌŶĂůŽĨŽŵŵĞƌĐĞ͗ ^ŽƵƌĐĞǁĞůů͕Ă^ƚĂƚĞŽĨDŝŶŶĞƐŽƚĂůŽĐĂůŐŽǀĞƌŶŵĞŶƚĂŐĞŶĐLJĂŶĚƐĞƌǀŝĐĞĐŽŽƉĞƌĂƚŝǀĞ͕ŝƐƌĞƋƵĞƐƚŝŶŐƉƌŽƉŽƐĂů ĨŽƌ
ƋƵŝƉŵĞŶƚZĞŶƚĂůǁŝƚŚZĞůĂƚĞĚ^ĞƌǀŝĐĞƐƚŽƌĞƐƵůƚŝŶĂĐŽŶƚƌĂĐƚŝŶŐƐŽůƵƚŝŽŶĨŽƌƵƐĞďLJŝƚƐWĂƌƚŝĐŝƉĂƚŝŶŐ
ŶƚŝƚŝĞƐ͘^ŽƵƌĐĞǁĞůůWĂƌƚŝĐŝƉĂƚŝŶŐ
ŶƚŝƚŝĞƐŝŶĐůƵĚĞƚŚŽƵƐĂŶĚƐŽĨŐŽǀĞƌŶŵĞŶƚĂů͕ŚŝŐŚĞƌĞĚƵĐĂƚŝŽŶ͕<ͲϭϮ ĞĚƵĐĂƚŝŽŶ͕ŶŽŶƉƌŽĨŝƚ͕ƚƌŝďĂůŐŽǀĞƌŶŵĞŶƚ͕ĂŶĚŽƚŚĞƌƉƵďůŝĐĂŐĞŶĐŝĞƐůŽĐĂƚĞĚŝŶƚŚĞhŶŝƚĞĚ^ƚĂƚĞƐĂŶĚ ĂŶĂĚĂ͘ĨƵůůĐŽƉLJŽĨƚŚĞZĞƋƵĞƐƚĨŽƌWƌŽƉŽƐĂůƐĐĂŶďĞĨŽƵŶĚŽŶƚŚĞ^ŽƵƌĐĞǁĞůůWƌŽĐƵƌĞŵĞŶƚWŽƌƚĂů ŚƚƚƉƐ͗ͬͬƉƌŽƉŽƌƚĂů͘ƐŽƵƌĐĞǁĞůůͲŵŶ͘ ͘KŶůLJƉƌŽƉŽƐĂůƐƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞ^ŽƵƌĐĞǁĞůůWƌŽĐƵƌĞŵĞŶƚ WŽƌƚĂůǁŝůůďĞĐŽŶƐŝĚĞƌĞĚ͘WƌŽƉŽƐĂůƐĂƌĞĚƵĞŶŽůĂƚĞƌƚŚĂŶ:ƵŶĞϮϯ͕ϮϬϮϬ͕Ăƚϰ͗ϯϬƉ͘ŵ͘ĞŶƚƌĂůdŝŵĞ͕ĂŶĚ ůĂƚĞƉƌŽƉŽƐĂůƐǁŝůůŶŽƚďĞĐŽŶƐŝĚĞƌĞĚ͘
dŚĞƐŽůŝĐŝƚĂƚŝŽŶƉƌŽĐĞƐƐǁĂƐĐŽŶĚƵĐƚĞĚƚŚƌŽƵŐŚƚŚĞ^ŽƵƌĐĞǁĞůůWƌŽĐƵƌĞŵĞŶƚWŽƌƚĂů͘dŚĞĨŽůůŽǁŝŶŐƉĂƌƚŝĞƐ ĞdžƉƌĞƐƐĞĚŝŶƚĞƌĞƐƚŝŶƚŚĞƐŽůŝĐŝƚĂƚŝŽŶďLJƌĞŐŝƐƚĞƌŝŶŐĨŽƌƚŚŝƐŽƉƉŽƌƚƵŶŝƚLJǁŝƚŚŝŶƚŚĞƉŽƌƚĂů͗ ZĞŶƚĂůĞŶƚĞƌŽĨWĂƌŵĂ,ƚƐ͕͘ /ŶĐ͘ :ĂĚĞ
ƋƵŝƉŵĞŶƚŽŵƉĂŶLJ͕ >ƚĚ͘ ĐŵĞKƉĞƌĂƚŝŽŶƐ͕>> :W
ƋƵŝƉŵĞŶƚZĞŶƚĂůƐ͕ /ŶĐ͘
ŐŐƌĞŬŽ͕ >> <ŽŵĂƚƐƵŵĞƌŝĐĂŽƌƉ͘
ŚĞƌŶZĞŶƚĂůƐ͕ /ŶĐ͘ >d>ŽŶƚƌĂĐƚŝŶŐ͕ >ƚĚ͘ ůů^ŽƵƚŚ^ŚŽƌĞDĞĚŝĐĂů^ƵƉƉůLJ͕ /ŶĐ͘ DĂdžŝƐƚƌŝďƵƚŝŶŐͬ^ŵĞƌŝĐĂ ůƚĞĐ/ŶĚƵƐƚƌŝĞƐ͕/ŶĐ͘ DŝĚƐƚĂƚĞƐ
ƋƵŝƉŵĞŶƚĂŶĚ^ƵƉƉůLJ
d^dƌĂĨĨŝĐ^ĂƐŬĂƚĐŚĞǁĂŶ EĞƐĐŽ͕>>
Ăƌ^ƚĂƌ
ŶĞƌŐLJ EŽƌƚŚ&ƌŝŶŐĞ/ŶĚƵƐƚƌŝĂůdĞĐŚŶŽůŽŐŝĞƐ͕ /ŶĐ͘
ĞƚƚƐWůĂƚŝŶƵŵ'ƌŽƵƉ͕ >> WĂĐĞƐĞƚƚĞƌ
ƋƵŝƉŵĞŶƚ͕ >ƚĚ͘
ŽďĐĂƚŽĨƌŽŽŬŝŶŐƐ͕/ŶĐ͘ WŚĞŶŝdž
ŶƚĞƌƉƌŝƐĞƐ͕/ŶĐ͘
ƌĂŶĚƚdƌƵĐŬZŝŐŐŝŶŐΘdƌĂŝůĞƌƐ WŽǁĞƌ^ĞĐƵƌĞ͕ /ŶĐ͘ ƌŝŶĚůĞĞDŽƵŶƚĂŝŶ&ŝƌĞƉƉĂƌĂƚƵƐ͕>> WƌĞŵŝĞƌdƌƵĐŬZĞŶƚĂů ĂŶĂĚƌŽŶĞ/ŶƐƉĞĐƚŝŽŶΘ/ŵĂŐŝŶŐ^ĞƌǀŝĐĞƐ WƌŝŵĞsĞŶĚŽƌ͕ /ŶĐ͘ ĂƉŝƚĂů/ŶĚƵƐƚƌŝĂů^ĂůĞƐΘ^ĞƌǀŝĐĞ͕ >ƚĚ͘ YƵĂůŝƚLJ&ŽƌŬůŝĨƚ^ĂůĞƐĂŶĚ^ĞƌǀŝĐĞ͕/ŶĐ͘ #4..
- 315 -
^ŽƵƌĐĞǁĞůů WĂŐĞϮŽĨϱ
ĂƚĞƌƉŝůůĂƌ͕ /ŶĐ͘ ZĂŝŶĨŽƌZĞŶƚ
ŚĂĚǁŝĐŬͲĂƌŽƐƐ͕/ŶĐ͘ ZĞŐŝŶĂŽŶƐƚƌƵĐƚŝŽŶƐƐŽĐŝĂƚŝŽŶ ůĂƌŬ
ƋƵŝƉŵĞŶƚŽŵƉĂŶLJ ^ŽƵŶĚƌƚĂůŐĂƌLJ͕ /ŶĐ͘ ůŝŵĂƚĞďLJĞƐŝŐŶ/ŶƚĞƌŶĂƚŝŽŶĂů͕/ŶĐ͘ ^ƚĞƌůŝŶŐdƌƵĐŬĂŶĚdƌĂŝůĞƌ^ĂůĞƐ͕ >ƚĚ͘ ŽůůŝĐƵƚƚ ŶĞƌŐLJ^ĞƌǀŝĐĞƐŽƌƉ͘ ^ƚƌĞĞƚ^ŵĂƌƚZĞŶƚĂů͕ >>
ŽŵƉĂĐƚŽƌZĞŶƚĂůƐŽĨŵĞƌŝĐĂ͕>> ^ƵŶďĞůƚZĞŶƚĂůƐ
ŽŵƉůĞƚĞ
ƋƵŝƉŵĞŶƚ ^ƵŶďĞůƚZĞŶƚĂůƐŽĨĂŶĂĚĂ
ŽƌƉŽƌĂƚĞ>ĞĂƐŝŶŐƐƐŽĐŝĂƚĞƐ͕/ŶĐ͘ d
ƋƵŝƉŵĞŶƚ
LJŶĂŵŝĐŝƌ^ŽůƵƚŝŽŶƐ dŚŽƌtŽƌŬƐ/ŶĚƵƐƚƌŝĞƐ
ŶǀŝƌŽͲŵĂŶĂŐĞŵĞŶƚWĂƌƚŶĞƌƐ͕>> dEdƌĂŶĞΘZŝŐŐŝŶŐĂŶĂĚĂ͕ /ŶĐ͘ &ĞĚĞƌĂůŽŶƚƌĂĐƚƐŽƌƉ͘ dŽďƌŽĐŽDĂĐŚŝŶĞƌLJ͕ >>
&ĞĚĞƌĂů^ŝŐŶĂůŽƌƉŽƌĂƚŝŽŶ dŽƌŽŵŽŶƚĂƚ͕ŝǀŝƐŝŽŶŽĨdŽƌŽŵŽŶƚ/ŶĚƵƐƚƌŝĞƐ͕ >ƚĚ͘ &^dĂŶĂĚĂ͕ /ŶĐ͘ hŶŝƚĞĚZĞŶƚĂůƐ;EŽƌƚŚŵĞƌŝĐĂͿ͕/ŶĐ͘ 'ƌĞĞŶůŝŵďĞƌŽĨEŽƌƚŚŵĞƌŝĐĂ tĞďďŽŶƚƌĂĐƚŝŶŐ
,ŝƚƌĂĐϭϵϳϰ tĞƐƚĞƌŶDĂƚĞƌŝĂůƐ,ĂŶĚůŝŶŐΘ
ƋƵŝƉŵĞŶƚ͕ >ƚĚ͘
,sDĞĐŚĂŶŝĐĂů^ĞƌǀŝĐĞƐŽĨdĞdžĂƐ͕ >ƚĚ͘ tŚŝƚĞŚĞĂĚ
ůĞĐƚƌŝĐŽ͕͘ /ŶĐ͘
/ŶĚƵƐƚƌŝĂůWŽǁĞƌ͕ >>
ůůWƌŽƉŽƐĂůƐƌĞŵĂŝŶĞĚƐĞĂůĞĚǁŝƚŚŝŶƚŚĞ^ŽƵƌĐĞǁĞůůWƌŽĐƵƌĞŵĞŶƚWŽƌƚĂůƵŶƚŝůƚŚĞƐĐŚĞĚƵůĞĚĚƵĞĚĂƚĞĂŶĚ ƚŝŵĞ͘WƌŽƉŽƐĂůƐǁĞƌĞĞůĞĐƚƌŽŶŝĐĂůůLJŽƉĞŶĞĚ͕ĂŶĚƚŚĞůŝƐƚŽĨĂ WƌŽƉŽƐĞƌƐǁĂƐŵĂĚĞƉƵďůŝĐůLJĂǀĂŝůĂďůĞŽŶƚŚĞ ^ŽƵƌĐĞǁĞůůWƌŽĐƵƌĞŵĞŶƚWŽƌƚĂů͕ŽŶ:ƵŶĞϮϯ͕ϮϬϮϬĂƚϰ͗ϯϭƉŵd͘WƌŽƉŽƐĂůƐǁĞƌĞƌĞĐĞŝǀĞĚĨƌŽŵƚŚĞĨŽůůŽǁŝŶŐ͗ ĐŵĞKƉĞƌĂƚŝŽŶƐ͕>>
ŚĞƌŶZĞŶƚĂůƐ͕/ŶĐ͘
ůƚĞĐ/ŶĚƵƐƚƌŝĞƐ͕/ŶĐ͘
ĞƚƚƐWůĂƚŝŶƵŵ'ƌŽƵƉ͕>>
ĂƚĞƌƉŝůůĂƌ͕/ŶĐ͘
ůĂƌŬ
ƋƵŝƉŵĞŶƚŽŵƉĂŶLJ
ŽŵƉĂĐƚŽƌZĞŶƚĂůƐŽĨŵĞƌŝĐĂ͕>>
&ĞĚĞƌĂů^ŝŐŶĂůŽƌƉŽƌĂƚ
,ŝƚƌĂĐϭϵϳϰ
,sDĞĐŚĂŶŝĐĂů^ĞƌǀŝĐĞƐŽĨdĞdžĂƐ͕>ƚĚ͘
:W
ƋƵŝƉŵĞŶƚZĞŶƚĂůƐ͕/ŶĐ͘
EĞƐĐŽ͕>>
WĂĐĞƐĞƚƚĞƌ
ƋƵŝƉŵĞŶƚ͕>ƚĚ͘
WŽǁĞƌ^ĞĐƵƌĞ͕/ŶĐ͘
WƌĞŵŝĞƌdƌƵĐŬZĞŶƚĂů
^ƚƌĞĞƚ^ŵĂƌƚZĞŶƚĂů͕>>
^ƵŶďĞůƚZĞŶƚĂůƐ
hŶŝƚĞĚZĞŶƚĂůƐ;EŽƌƚŚŵĞƌŝĐĂͿ͕/ŶĐ͘
WƌŽƉŽƐĂůƐǁĞƌĞƌĞǀŝĞǁĞĚďLJƚŚĞWƌŽƉŽƐĂů
ǀĂůƵĂƚŝŽŶŽŵŵŝƚƚĞĞ
<ŝŵƵƐƚŝŶ͕WW͕WƌŽĐƵƌĞŵĞŶƚ>ĞĂĚŶĂůLJƐƚ
ƌĂŶĚŽŶdŽǁŶ͕W^D͕W^͕WƌŽĐƵƌĞŵĞŶƚŶĂůLJƐƚ
DŝĐŚĂĞůDƵŹŽnj͕WW͕^ŽƵƌĐĞǁĞůůWƌŽĐƵƌĞŵĞŶƚŶĂůLJƐƚ
^ƚĞƉŚĂŶŝĞ,ĂĂƚĂũĂ͕W/D͕WƌŽĐƵƌĞŵĞŶƚŶĂůLJƐ
#4..
- 316 -
^ŽƵƌĐĞǁĞůů WĂŐĞϯŽĨϱ
dŚĞĨŝŶĚŝŶŐƐŽĨƚŚĞWƌŽƉŽƐĂů
ǀĂůƵĂƚŝŽŶŽŵŵŝƚƚĞĞĂƌĞƐƵŵŵĂƌŝnjĞĚĂƐĨŽůůŽǁƐ͗
dŚĞWƌŽƉŽƐĂů
ǀĂůƵĂƚŝŽŶŽŵŵŝƚƚĞĞĂƉƉůŝĞĚƚŚĞ^ŽƵƌĐĞǁĞůů Z&WĞǀĂůƵĂƚŝŽŶĐƌŝƚĞƌŝĂĂŶĚĚĞƚĞƌŵŝŶĞĚƚŚĂƚĂůů ƉƌŽƉŽƐĂůƌĞƐƉŽŶƐĞƐŵĞƚƚŚĞƐĐŽƉĞĂŶĚŵĂŶĚĂƚŽƌLJƐƵďŵŝƚƚĂůƌĞƋƵŝƌĞŵĞŶƚƐĂŶĚǁĞƌĞĞǀĂůƵĂƚĞĚ͘ 'ůŽďĂůZĞŶƚĂů͕ĂƐƵďƐŝĚŝĂƌLJŽĨůƚĞĐ/ŶĚƵƐƚƌŝĞƐ͕/ŶĐ͕͘ŽĨĨĞƌƐƉĂƌƚŝĐŝƉĂƚŝŶŐĞŶƚŝƚŝĞ ĂĞƌŝĂůĚĞǀŝĐĞƐ͕ĐƌĂŶĞƐ͕ĚƵŵƉƚƌƵĐŬƐ͕ĐĂďůĞŚĂŶĚůĞƌƐ͕ƉŽůĞƚƌĂŝůĞƌƐ͕ĂŶĚĂǀĂƌŝĞƚLJŽĨŽƚŚĞƌŽƉƚŝŽŶƐƚŽŵĞĞƚƚŚĞŝƌ ƉƵďůŝĐƵƚŝůŝƚLJŶĞĞĚƐ͘'ůŽďĂůZĞŶƚĂůŚĂƐĂƌŽďƵƐƚƐĂůĞƐĨŽƌĐĞĐŽǀĞƌŝŶŐƚŚĞhŶŝƚĞĚ^ƚĂƚĞƐĂŶĚĂŶĂĚĂĂŶĚϮϰͲŚŽƵƌ ŵŽďŝůĞĞŵĞƌŐĞŶĐLJƐĞƌǀŝĐĞĂǀĂŝůĂďůĞ͘'ůŽďĂůZĞŶƚĂůŽĨĨĞƌƐĂĐŽŵƉĞƚŝƚŝǀĞĚŝƐĐŽƵŶƚƚŽ^ŽƵƌĐĞǁĞůůƉĂƌƚŝĐŝƉĂƚŝŶŐ ĞŶƚŝƚŝĞƐ͘
ĂƚĞƌƉŝůůĂƌ/ŶĐ͘;dͿ͕ŽĨĨĞƌƐĐŽŶƐƚƌƵĐƚŝŽŶ͕ŵŝŶŝŶŐ͕ĞŶĞƌŐLJ͕ĂŶĚƚƌĂŶƐƉŽƌƚĂƚŝŽŶĞƋƵŝƉŵĞŶƚ͘tŝƚŚĂǀĂƐƚ ŝŶĚĞƉĞŶĚĞŶƚůLJŽǁŶĞĚĚĞĂůĞƌŶĞƚǁŽƌŬƚŚĞLJĂƌĞĂďůĞƚŽƉƌŽǀŝĚĞĐŽǀĞƌĂŐĞƚŚƌŽƵŐŚŽƵƚƚŚĞhŶŝƚĞĚ^ƚĂƚĞƐĂŶĚ ĂŶĂĚĂ͘dĚĞĂůĞƌƐƌĞŶƚĂǁŝĚĞǀĂƌŝĞƚLJŽĨdďƌĂŶĚĞĚĞƋƵŝƉŵĞŶƚ͕ĂƐǁĞůůĂƐĞƋƵŝƉŵĞŶƚŽĨŽƚŚĞƌƌĞƉƌĞƐĞŶƚĞĚ ďƌĂŶĚƐ͘/ŶĂĚĚŝƚŝŽŶƚŽƌĞŶƚĂůƐ͕ĂƚĞƌƉŝůůĂƌŝƐďƌŝŶŐŝŶŐĂĐĐĞƐƐƚŽƵƐĞĚŵĂĐŚŝŶĞƐĂůĞƐ͕ƉĂƌƚƐ͕ĂŶĚƐĞƌǀŝĐĞ͘^ŽƵƌĐĞǁĞůů ƉĂƌƚŝĐŝƉĂƚŝŶŐĂŐĞŶĐŝĞƐǁŝůůƌĞĐĞŝǀĞĚŝƐĐŽƵŶƚĞĚ͕ŶŽƚƚŽĞdžĐĞĞĚƉƌŝĐŝŶŐ͘ ^ƵŶďĞůƚZĞŶƚĂůƐŝƐŽĨĨĞƌŝŶŐĂĨƵůůůŝŶĞŽĨƌĞŶƚĂůĞƋƵŝƉŵĞŶƚŝŶĐůƵĚŝŶŐŐĞŶĞƌĂůƚŽŽůĂŶĚĐŽŶƐƚƌƵĐƚŝŽŶĞƋƵŝƉŵĞŶƚ͕ ĐůŝŵĂƚĞĐŽŶƚƌŽů͕ƉŽǁĞƌŐĞŶĞƌĂƚŝŽŶ͕ƉƵŵƉƐŽůƵƚŝŽŶƐ͕ŐƌŽƵŶĚƉƌŽƚĞĐƚŝŽŶ͕ƚĞŵƉŽƌĂƌLJďƌŝĚŐŝŶŐ͕ƚƌĞŶĐŚƐŚŽƌŝŶŐ͕ ƐĐĂĨĨŽůĚŝŶŐ͕ƐĂĨĞƚLJƚƌĂŝŶŝŶŐ͕ĂŶĚƵƐĞĚĞƋƵŝƉŵĞŶƚƐĂůĞƐ dŚĞLJŚĂǀĞĂǀĂƐƚŶĞƚǁŽƌŬŽĨůŽĐĂƚŝŽŶƐƚŚƌŽƵŐŚŽƵƚƚŚĞ hŶŝƚĞƐ^ƚĂƚĞƐĂŶĚĂŶĂĚĂĂŶĚŽĨĨĞƌϮϰͬϳĐƵƐƚŽŵĞƌƐƵƉƉŽƌƚ͘^ƵŶďĞůƚZĞŶƚĂůƐŝƐŽĨĨĞƌŝŶŐƐŝŐŶŝĨŝĐĂŶƚůLJĚŝƐĐŽƵŶƚĞ ƌĂƚĞƐĨŽƌ^ŽƵƌĐĞǁĞůůƉĂƌƚŝĐŝƉĂƚŝŶŐĞŶƚŝƚŝĞƐ͘
hŶŝƚĞĚZĞŶƚĂůƐ͕/ŶĐ͕͘ŝƐŽĨĨĞƌŝŶŐ^ŽƵƌĐĞǁĞůůĂĐŽŵƉƌĞŚĞŶƐŝǀĞƐĞůĞĐƚŝŽŶŽĨŐĞŶĞƌĂůĂŶĚƐƉĞĐŝĂůŝnjĞĚƌĞŶƚĂů ĞƋƵŝƉŵĞŶƚƐƵĐŚĂƐĐŽŶƐƚƌƵĐƚŝŽŶ͕ƉŽǁĞƌĂŶĚ,sĞƋƵŝƉŵĞŶƚ͕ĨůƵŝĚƉƵŵƉŝŶŐĞƋƵŝƉŵĞŶƚ͕ƚƌĞŶĐŚƐĂĨĞƚLJĂŶĚ ƐŚŽƌŝŶŐ͕ŽŶƐŝƚĞƐĞƌǀŝĐĞƐ͕ĂŶĚƚŽŽůƐŽůƵƚŝŽŶƐ͘dŚĞŝƌƌĞŶƚĂůĞƋƵŝƉŵĞŶƚŝƐĂǀĂŝůĂďůĞƚŽ^ŽƵƌĐĞǁĞůůŵĞŵďĞƌƐĂĐƌŽƐƐ ƚŚĞhŶŝƚĞĚ^ƚĂƚĞƐĂŶĚĂŶĂĚĂĂƚŽǀĞƌϭϬϬϬhŶŝƚĞĚZĞŶƚĂůďƌĂŶĐŚůŽĐĂƚŝŽŶƐ͘ŽŵƉƌĞŚĞŶƐŝǀĞĐĞƌƚŝĨŝĐĂƚŝŽŶĂŶĚ ƚƌĂŝŶŝŶŐĨŽƌĂůůĞƋƵŝƉŵĞŶƚŝƐƉƌŽǀŝĚĞĚďLJƚŚĞhŶŝƚĞĚĐĂĚĞŵLJ͕ŝŶĐůƵĚŝŶŐĂƌŽďƵƐƚůŝďƌĂƌLJŽĨĐŽƵƌƐĞƐ͕ĂŶĚK^, ƌĞƋƵŝƌĞĚƚƌĂŝŶŝŶŐ͘ůůƉƌŽĚƵĐƚƐƉƌŽƉŽƐĞĚďLJhŶŝƚĞĚZĞŶƚĂůƐĂƌĞďĞŝŶŐƉƌŽǀŝĚĞĚĂƚĐŽŵƉĞƚŝƚŝǀĞƉƌŝĐŝŶŐǁŝƚŚĂ ƐŽůŝĚĚŝƐĐŽƵŶƚ͘
&ŽƌƚŚĞƐĞƌĞĂƐŽŶƐ͕ƚŚĞ^ŽƵƌĐĞǁĞůůWƌŽƉŽƐĂůZĞǀŝĞǁŽŵŵŝƚƚĞĞƌĞĐŽŵŵĞŶĚƐĂǁĂƌĚŽĨ^ŽƵƌĐĞǁĞůůŽŶƚƌĂĐƚ ηϬϲϮϯϮϬƚŽ͗
ůƚĞĐ/ŶĚƵƐƚƌŝĞƐ͕/ŶĐ͘ ϬϲϮϯϮϬͲ d ĂƚĞƌƉŝůůĂƌ/ŶĐ͘ ϬϲϮϯϮϬͲ d
^ƵŶďĞůƚZĞŶƚĂůƐ ϬϲϮϯϮϬ E
hŶŝƚĞĚZĞŶƚĂůƐ͕/ŶĐ͘ ϬϲϮϯϮ hZ/
dŚĞƉƌĞĐĞĚŝŶŐƌĞĐŽŵŵĞŶĚĂƚŝŽŶƐǁĞƌĞĂƉƉƌŽǀĞĚŽŶƵŐƵƐƚϮϰ͕ϮϬϮϬ͘ ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ <ŝŵƵƐƚŝŶ͕WW͕WƌŽĐƵƌĞŵĞŶƚ>ĞĂĚŶĂůLJƐƚ #4..
- 317 -
^ŽƵƌĐĞǁĞůů WĂŐĞϰŽĨϱ
ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ ƌĂŶĚŽŶdŽǁŶ͕W^D͕W^WƌŽĐƵƌĞŵĞŶƚŶĂůLJƐƚ ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ DŝĐŚĂĞůDƵŹŽnj͕WW͕^ŽƵƌĐĞǁĞůůWƌŽĐƵƌĞŵĞŶƚŶĂůLJƐƚ ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ ^ƚĞƉŚĂŶŝĞ,ĂĂƚĂũĂ͕W/D͕WƌŽĐƵƌĞŵĞŶƚŶĂůLJƐƚ
#4..
- 318 -
^ŽƵƌĐĞǁĞůů WĂŐĞϱŽĨ ϱ
^dd
D
EdK&KDW>/E
ƐŚŝĞĨWƌŽĐƵƌĞŵĞŶƚKĨĨŝĐĞƌĨŽƌ^ŽƵƌĐĞǁĞůů͕/ŚĂǀĞƌĞǀŝĞǁĞĚƚŚĞƌĞĐŽŵŵĞŶĚĂƚŝŽŶŽĨƚŚĞ ǀĂůƵĂƚŝŽŶŽŵŵŝƚƚĞĞ
ĂŶĚƚŚĞĂĐĐŽŵƉĂŶLJŝŶŐƐƵƉƉŽƌƚŵĂƚĞƌŝĂůƐĚŽĐƵŵĞŶƚŝŶŐƚŚĞƉƌŽĐĞƐƐĨŽůůŽǁĞĚĨŽƌZ&WηϬϲϮϯϮϬĨŽƌ ƋƵŝƉŵĞŶƚ
ZĞŶƚĂůǁŝƚŚZĞůĂƚĞĚ^ĞƌǀŝĐĞƐ͘ dŚĞĐŽŵŵŝƚƚĞĞĂĐĐĞƉƚĞĚ͕ĚĞĞŵĞĚƌĞƐƉŽŶƐŝǀĞ͕ĞǀĂůƵĂƚĞĚ͕ĂŶĚƌĞĐŽŵŵĞŶĚĞĚƉƌŽƉŽƐĂůƐĨŽƌĂǁĂƌĚ͘hŶĚĞƌĂƵƚŚŽƌŝƚLJ ŐƌĂŶƚĞĚƚŽƚŚĞŚŝĞĨWƌŽĐƵƌĞŵĞŶƚKĨĨŝĐĞƌŝŶ^ŽƵƌĐĞǁĞůů͛ƐďLJůĂǁƐ͕ƚŚĞƌĞĐŽŵŵĞŶĚĂƚŝŽŶƐƐĞƚĨŽƌƚŚĂďŽǀĞĂƌĞ ĂƉƉƌŽǀĞĚ͘
/ŚĞƌĞďLJĐĞƌƚŝĨLJ͗
ϭ͘^ŽƵƌĐĞǁĞůůŝƐĂŐŽǀĞƌŶŵĞŶƚĂŐĞŶĐLJ͕ĐƌĞĂƚĞĚĂŶĚĂƵƚŚŽƌŝnjĞĚďLJDŝŶŶĞƐŽƚĂůĂǁƚŽƉƌŽǀŝĚĞĐŽŽƉĞƌĂƚŝǀĞ ƉƌŽĐƵƌĞŵĞŶƚĐŽŶƚƌĂĐƚƐ͘
Ϯ͘dŚĞƉƌŽĐƵƌĞŵĞŶƚƉƌŽĐĞƐƐĂŶĚƌĞƐƵůƚŝŶŐĐŽŶƚƌĂĐƚƐŚĂǀĞďĞĞŶĂǁĂƌĚĞĚŝŶĐŽŵƉůŝĂŶĐĞǁŝƚŚƚŚĞůĂǁƐŽĨƚŚĞ^ƚĂƚĞ ŽĨDŝŶŶĞƐŽƚĂ;DŝŶŶĞƐŽƚĂ^ƚĂƚƵƚĞƐŚĂƉƚĞƌϰϳϭĂŶĚDŝŶŶĞƐŽƚĂ^ƚĂƚƵƚĞƐ^ĞĐƚŝŽŶϭϮϯ͘ϮϭͿ͕ĂŶĚŝŶĐŽŶĨŽƌŵŝƚLJƚŽ ^ŽƵƌĐĞǁĞůů͛ƐWƌŽĐƵƌĞŵĞŶƚWŽůŝĐLJ͘
:ĞƌĞŵLJ^ĐŚǁĂƌƚnj͕^^͕WWK ŚŝĞĨWƌŽĐƵƌĞŵĞŶƚKĨĨŝĐĞƌ #4..
- 319 -
CITY OF MODESTO
COUNCIL AGENDA REPORT
DATE OF MEETING:
October 10, 2023
Date: August 22, 2023
TO: Mayor and City Council
THROUGH: Joseph P. Lopez, City Manager
FROM: DeAnna Christensen, Director of Finance
Bill Sandhu, Public Works Director
SUBJECT: Rental Fleet Agreements
CONTACT: Dianne Love, Purchasing Manager, [email protected], 209-571-5164 DESCRIPTION: Consider approving the Agreements for Rental Fleet Services with Herc Rentals, Modesto, California (CA), Holt of California, Salida, California and United Rentals, Modesto, California for a total amount not to exceed $2,000,000 over five years. (Funding Source: Various Funds) STRATEGIC PLAN ELEMENT:
This item advances the City of Modesto 2020-2025 Strategic Plan Area: Governance and Service Delivery: “build community trust in City government through responsive, transparent and efficient service delivery”; Goal J: “build a high-performance organization”.
BACKGROUND:
Various operational divisions within Parks, Recreation and Neighborhood, Utilities and Public Works Departments have a need for rental equipment for City projects and programs. Several of the City projects and programs, included but not limited to, the Blight Abatement Program, Tree Maintenance Program, Street Light and Traffic Maintenance Program, and various Capital Improvement Program projects. In addition, due to the supply chain challenges with the purchase of replacement fleet vehicles there are delays in receiving the new replacement vehicles by about 6-12 months which will increase the demand needed for rental equipment and vehicles.
With the approval of Measure H, there will be an increase in demand for vehicles and equipment that need to be purchased by the various departments to meet the needs for the programs that were approved through the spending plan. This will only intensify the need for rental agreements across the organization to fill this unmet demand while departments wait for the vehicle and equipment purchases to be fulfilled.
On December 5, 2017, under Resolution 2017-490, Council approved the award of bids for rental equipment services to Herc Rentals, Modesto, CA; Holt of California, Salida, CA; Sunbelt #4..
- 320 -
City Council, October 10, 2023
Rental Fleet Agreements
Rentals, Ceres, CA; and United Rentals, Modesto, CA; for a two-year agreement with three one-year extension options at the sole discretion of the City, for an estimated annual cost of $500,000, and $2,500,000 over five years. An amendment was executed to extend the agreement but several of the agreements have expired or near expiration date.
DISCUSSION:
On October 12, 2021, the City Manager authorized the Purchasing Manager to solicit the procurement for rental fleet services. The Purchasing Division was able to identify three cooperative agreements to meet the City’s formal bidding procedures which are outlined below.
Herc Rentals – OMNIA Partners
On June 26, 2019, OMNIA Partners issued Request for Proposal (RFP) # 269-2018-047 for Equipment Rentals and Related Products and Services on the Charlotte Observer Newspaper, North Carolina Interactive Purchasing system, and US Communities. On November 1, 2018, the proposals were opened at Charlotte Government facility site. Three (3) proposals were received and based on the Evaluation Committee and criteria outlines in the RFP, two (2) contracts were awarded for this commodity with Herc Rentals and Bid Truck which includes Rental Fleet Services. Based on the responsive and responsible proposal provide by Herc Rentals, the City staff recommends to award to Herc Rentals for the Rental Fleet Services.
Holt of CA and United Rentals – Sourcewell
On May 1, 2020, Sourcewell issued Request for Proposal (RFP) #062320-CAT for Equipment Rentals and Related Products and Services on the Utah Salt Lake Tribune, USA Today, South Carolina’s The State, Sourcewell public website, the New York State Contract Reporter and PublicPurchase.com. On June 23, 2020, the proposals were opened electronically via Sourcewell Procurement Portal. Eighteen (18) proposals were received and based on the Sourewell Evaluation Committee and criteria outlines in the RFP, four (4) contracts were awarded for this commodity which included Caterpillar Inc, Deerfield, IL with Holt of CA, Salida, CA being the Rental facilitator and United Rentals, Modesto CA for Rental Fleet Services.
Caterpillar Inc. owns all of the equipment and Holt of CA is a subdivision of Caterpillar who handles all rental services for this equipment. Based on the responsive and responsible proposal provided by Caterpiller Inc., the City staff recommends to award to Caterpillar Inc, Deerfield, IL with Holt of CA, Salida, CA being the Rental facilitator and United Rentals, Modesto, CA for the Rental Fleet Services.
OMNIA Partners and Sourcewell are cooperative agencies which streamlines the procurement process by developing Invitation for Bids (IFB)’s or RFP’s for national competitive solicitations that meet or exceed local requirements. The competitive process is continually refined to best meet agency needs and allows OMNIA Partners and Sourcewell to offer exceptional products from nationally acclaimed vendors.
Modesto Municipal Code Section 8-3.203 generally requires all purchases that meet or exceed $50,000 for material, equipment, or contractual services to be formally bid. However, exceptions to the formal bidding process are granted in MMC 8-3.204(d) “Where the Purchasing Manager, in her discretion, determines that a process other than the formal bid procedure set for in Section 8-3.203 will result in a procurement for the City at the lowest possible cost commensurate with the desired quality.” In addition, MMC 8-3.202(h) encourages the Purchasing Manager to join with the State of California or other units of government in cooperative purchasing plans when the best cost savings interest of the City would be served. #4..
- 321 -
City Council, October 10, 2023
Rental Fleet Agreements
By utilizing the OMNIA Partners and Sourcewell, the City is complying with the requirements defined under this code for the proposed Rental Fleet Services agreements.
FISCAL IMPACT:
Sufficient funds are budgeted in Fiscal Year 2023-24 and will be budgeted for future years through the term of this agreement, to cover the cost for these Rental Fleet Services across City departments. Below is the average annual and overall spending history for Rental Fleet Services:
Vendor Total Spend Average Annual
Holt of CA $302,511 $60,502
United Rental $101,680 $20,336
Herc Rental $1,037,736 $207,547
Totals $1,441,927 $288,385
The agreements anticipate an annual increase on the Consumer Price Index for the West Region. Based on the current annual spending with various programs increasing from Measure H, it is anticipated the annual average spending will be $400,000 annually with increases estimated due to inflation, increase usage due to Measure H and supply demands ranging from 5-8% for an overall not to exceed an amount of $2,000,000.
COMMITTEE RECOMMENDATION:
This item was presented at the August 21, 2023, Finance Committee and approved to move forward to Council.
RECOMMENDED COUNCIL ACTION:
Staff Recommendations:
Resolution approving the Agreements with Herc Rentals, Modesto, CA, Holt of California, Salida, CA, and United Rentals, Modesto, CA, by utilizing the Competitive Bid Process with OMNIA Partners and Sourcewell, for Rental Fleet Services for a one-year Agreement with four (4) one-year extension options, for an annual estimated amount of $400,000 and a total amount not to exceed $2,000,000 over five years; and authorizing the City Manager or his designee to execute the Agreements.
Approved by: _____
DeAnna Christensen, Director of Finance
Bill Sandhu, Public Works Director
Joseph P. Lopez, City Manager
#4..
- 322 -
City Council, October 10, 2023
Rental Fleet Agreements
Attachments:
1. Resolution
2. Herc Rentals Agreement
3. Exhibit B - Herc Rentals Price Schedule
4. Exhibit C - Herc Rentals Omnia RFP #269-2018-047
5. United Rentals Agreement
6. Exhibit B - United Rentals Price Schedule
7. Exhibit C – Holt of CA and United Rentals Sourcewell RFP #062320
8. Holt of CA Agreement
#4..
- 323 -
10/10/2023/Finance/DLove/Item 8 1 2023-443
MODESTO CITY COUNCIL
RESOLUTION NO. 2023-443
RESOLUTION APPROVING THE AGREEMENTS WITH HERC RENTALS,
MODESTO, CALIFORNIA (CA), HOLT OF CALIFORNIA, SALIDA, CA AND
UNITED RENTALS, MODESTO, CA, BY UTILIZING THE COMPETITVE BID
PROCESS WITH OMNIA PARTNERS AND SOURCEWELL FOR RENTAL
FLEET SERVICES FOR A ONE-YEAR AGREEMENT WITH FOUR (4) ONEYEAR EXTENSION OPTIONS, FOR AN ANNUAL ESTIMATED AMOUNT OF $400,000 AND A TOTAL AMOUNT NOT TO EXCEED $2,000,000 OVER FIVE YEARS; AND AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO
EXECUTE THE AGREEMENTS
WHEREAS, various operational divisions within Parks, Recreation and Neighborhood, Utilities and Public Works Departments have a need for rental equipment for City projects and programs; and
WHEREAS, on October 12, 2021, the City Manager authorized the Purchasing Manager to solicit the procurement for rental fleet services; and WHEREAS, on June 26, 2019, OMNIA Partners issued Request for Proposal (RFP) # 269-2018-047 for Equipment Rentals and Related Products and Services on the Charlotte Observer Newspaper, North Carolina Interactive Purchasing system, and US Communities; and
WHEREAS, on November 1, 2018, the proposals were opened at Charlotte Government facility site; and
WHEREAS, three (3) proposals were received and based on the Evaluation Committee and criteria outlines in the RFP, two (2) contracts were awarded for this commodity with Herc Rentals and Bid Truck which includes Rental Fleet Services; and WHEREAS, based on the responsive and responsible proposal provide by Herc Rentals, the City staff recommends to award to Herc Rentals for the Rental Fleet Services; and
#4..
- 324 -
10/10/2023/Finance/DLove/Item 8 2 2023-443
WHEREAS, on May 1, 2020, Sourcewell issued Request for Proposal (RFP) #062320-CAT for Equipment Rentals and Related Products and Services on the Utah Salt Lake Tribune, USA Today, South Carolina’s The State, Sourcewell public website, the New York State Contract Reporter and PublicPurchase.com; and WHEREAS, on June 23, 2020, the proposals were opened electronically via Sourcewell Procurement Portal and eighteen (18) proposals were received and based on the Sourewell Evaluation Committee and criteria outlines in the RFP, four (4) contracts were awarded for this commodity which included Caterpillar Inc, Deerfield, IL with Holt of CA, Salida, CA being the Rental facilitator and United Rentals, Modesto CA for Rental Fleet Services; Caterpillar Inc. owns all of the equipment and Holt of CA is a subdivision of Caterpillar who handles all rental services for this equipment; and WHEREAS, based on the responsive and responsible proposal provided by Caterpiller Inc., the City staff recommends to award to Caterpillar Inc, Deerfield, IL with Holt of CA being the rental facilitator, Salida, CA and United Rentals, Modesto, CA for the Rental Fleet Services; and
WHEREAS, OMNIA Partners and Sourcewell are cooperative agencies which streamlines the procurement process by developing Invitation for Bids (IFB)’s or RFP’s for national competitive solicitations that meet or exceed local requirements; and WHEREAS, Modesto Municipal Code Section 8-3.203 generally requires all purchases that meet or exceed $50,000 for material, equipment or contractual services to be formally bid; However, exceptions to the formal bidding process are granted in MMC 8-3.204(d) “Where the Purchasing Manager, in her discretion, determines that a process #4..
- 325 -
10/10/2023/Finance/DLove/Item 8 3 2023-443
other than the formal bid procedure set for in Section 8-3.203 will result in a procurement for the City at the lowest possible cost commensurate with the desired quality.”; and WHEREAS, MMC 8-3.202(h) encourages the Purchasing Manager to join with the State of California or other units of government in cooperative purchasing plans when the best cost savings interest of the City would be served and by utilizing the OMNIA Partners and Sourcewell, the City is complying with the requirements defined under this code for the proposed Rental Fleet Services agreements.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Modesto that it hereby approves the Agreements with Herc Rentals, Modesto, CA, Holt of California, Salida, CA, and United Rentals, Modesto, CA, by utilizing the Competitive Bid Process with OMNIA Partners and Sourcewell, for Rental Fleet Services for a oneyear Agreement with four (4) one-year extension options, for an annual estimated amount of $400,000 and a total amount not to exceed $2,000,000 over five years.
BE IT FURTHER RESOLVED, that the City Manager, or his designee, is hereby authorized to execute the Agreements, in a form approved by the City Attorney.
BE IT FURTHER RESOLVED that the City Manager, or designee, may adjust the amount of the agreements with the three vendors, subject to a total amount not to exceed $2,000,000 over five years.
#4..
- 326 -
#4..
- 327 -
#4..
- 328 -
CITY OF MODESTO
COMMITTEE AGENDA REPORT
DATE OF MEETING:
May 20, 2024
Date: May 1, 2024
TO: Finance Committee
Nick Bavaro, Chair
Rosa Escutia-Braaton, Vice-Chair
David Wright, Member
THROUGH: Joseph P. Lopez, City Manager
FROM: Bill Sandhu, Director of Public Works
SUBJECT: Second Amendment to the Agreement for On-Site Tire Technician CONTACT: Patrick Crowley, Senior Public Works Manager, [email protected], 209-342-2274
DESCRIPTION:
Consider the Second Amendment to the Agreement for an On-Site Tire Technician with Fleet Tire Inc. dba Brannon Tire, Stockton, CA. for tire services, inspection and repairs to City vehicle tires for an annual estimated cost increase of $121,080 from $88,920 to $210,000 and a total revised not to exceed amount from $444,600 to a new total amount of $654,600 and extending the term of the Agreement from June 10, 2024, to June 10, 2025, and forwarding to Council for approval. (Funding Source: Fleet Management Fund)
STRATEGIC PLAN ELEMENT:
This item is in conformance with City of Modesto Strategic Plan Area: Governance and Service Delivery: “build community trust in City government through responsive, transparent and efficient service delivery”; Goal J: “build a high-performance organization”.
BACKGROUND:
On August 11, 2015, by Resolution No. 2015-292, Council approved a Purchasing agreement with Brannon Tires, Stockton, CA. for the furnishing of tire recapping, flat repairs, tire mounting and balancing for the City's Fleet of vehicles of $63,691 and over five years $318,455. On August 28, 2023, by City Manager authority, Brannon Tires entered into the first amendment to the agreement with the City of Modesto to execute the five-year extension and amend the pricing schedule with no increase in annual expenditures.
The City has an ongoing need for an hourly tire service for heavy and light duty vehicle tire work that current staffing levels are unable to perform. It is anticipated these services are required up to three times per week for the maintenance of the city's vehicles, equipment and other assets throughout the year.
#5..
- 329 -
Finance Committee, May 20, 2024
Second Amendment to the Agreement for On-Site Tire Technician
The City will provide air, jacks and jack stands, wheel balancer, a tire changer only for use on light duty vehicles and a tire gun. Specialized or additional equipment is to be provided by the vendor as needed.
DISCUSSION:
The Public Works, Fleet Division is requesting an On-Site Tire Technician to perform tire service, inspection and repairs to city vehicle tires, trailers, light and heavy-duty trucks and heavy-duty off-road equipment preferably Monday, Wednesday and Friday for approximately six hours per day.
The technician will complete inspections which include, but not limited to; checking for air pressure, flats, nails, cuts, cracks, defects, mismatched tires, irregular wear, tread depth or any other issues that may deem the tires unsafe for the equipment to be utilized. The technician will replace tires when the tread depth reaches the legal limits or when requested by Fleet staff, the technician shall fix repairable tires and or replace unusable tires using the City's inventory.
The technician shall have the capability to mount and dismount tires of multiple sizes and weights ranging from light to heavy duty. The technician will provide his/her own work truck, tools and equipment capable of performing work as defined within the scope of work and general requirements and labor.
The purchasing agreement originally established with Brannon Tires was based on estimated costs from 2019-2020 fiscal year. As the City purchased additional vehicles, increased services through Measure H, and entered into service agreements with Stanislaus Regional Transit Authority (StanRTA) JPA for 147 transit vehicles, and five Fire Districts to provide vehicle maintenance services, the demand for tire repairs have increased. Additionally, market conditions, increased costs for materials and labor have impacted the annual expenditure rates for these goods and services.
Modesto Municipal Code Section 8-3.203 generally requires all purchases which meet or exceed $100,000 for material, equipment, or contractual services to be formally bid. However, exceptions to the formal bidding process are granted in MMC 8-3.204 Where the Purchasing Manager, in his or her discretion, determines that the term of an existing agreement should be extended for a period of no greater than one (1) year to allow the City to complete a formal bidding process for a long-term agreement or to avoid disruption to City projects or services.
FISCAL IMPACT:
Due to the ongoing service needs as described in the background and discussion sections, additional funding in the amount of $210,000 will be required to maintain operations in the Fleet Services Division for the duration of this agreement and extension. The service agreements with StanRTA and the five Fire Districts will be recovered through monthly invoicing to these agencies. The expenses related to this agreement are paid from the Fleet Management Fund 5400. Internal costs are recovered through the Fleet Internal Service Fund (ISF) through the monthly Operating & Maintenance billing.
#5..
- 330 -
Finance Committee, May 20, 2024
Second Amendment to the Agreement for On-Site Tire Technician
Original Agreement Term Average Annual
1 $65,793.21
2 $63,128.91
3 $105,710.35
4 $130,084.22
5 (YTD) $102,834.14
Total Cost (YTD) $467,550.83
Amended Agreement Term Average Annual
Hourly rate approx. $145 $167,040
Trip Charges $55 $ 10,560
3-month overlap $ 32,400
Agreement Remaining Cost $210,000
RECOMMENDED COMMITTEE ACTION:
Staff Recommendations:
Motion recommending the Second Amendment for an On-Site Tire Technician with Fleet Tire Inc. dba Brannon Tire, Stockton, CA. for tire services, inspection and repairs to City vehicle tires for an annual estimated cost increase of $121,080 from $88,920 to $210,000 and a total revised not to exceed amount from $444,600 to a new total amount of $654,600 and extending the term of the Agreement from June 10, 2024, to June 10, 2025, and forwarding to Council for approval.
Approved by:
Bill Sandhu, Public Works Director
Joseph P. Lopez, City Manager
Attachments:
1. Amendment #2
2. Amendment #1
3. Brannon Tire Executed Agreement
#5..
- 331 -
1 SECOND AMENDMENT TO ON-SITE TIRE TECHNICIAN AGREEMENT WITH FLEET TIRE, INC dba BRANNON TIRE
This SECOND AMENDMENT to the AGREEMENT for On-Site Tire Technician, hereinafter referred to as SECOND AMENDMENT, is made and entered into in the City of Modesto, State of California, this ____ day of_____________, 2024, by and between the City of Modesto, a municipal corporation of the State of California, hereinafter called CITY, and Fleet Tire, Inc dba Brannon Tire, a corporation of the State of California, hereinafter referred to as CONTRACTOR.
This SECOND AMENDMENT is made with reference to the following recitals:
A. Agreement No. 159091 for On-Site Tire Technician, hereinafter referred to as AGREEMENT, was entered into by and between CITY and CONTRACTOR on the 7th day of May, 2019, and
B. The First Amendment to AGREEMENT was entered into on August 28, 2023 for the purposes of amending the term to include the year five extension and amending pricing to a rate of $141.00 per hour with a per trip charge of $52.25.
C. CITY and CONTRACTOR desire to amend the AGREEMENT by extending the term of the AGREEMENT to add an additional 12 months with a termination date of June 10, 2025.
D. The CITY and CONTRACTOR desire to amend the AGREEMENT by increasing the previously approved sum not to exceed by $210,000 to a revised sum not to exceed $654,600 through the term of the agreement.
E. CITY and CONTRACTOR now desire to memorialize the change to the terms of the AGREEMENT with this SECOND AMENDMENT.
NOW, THEREFORE, the parties hereto mutually agree to the following:
#5..
- 332 -
2 1. Section 3 “Term” shall be amended to add an additional 12-month extension; June 10, 2024 through June 10 2025.
2. Section 1 (f) “Pricing” shall be amended to increase the sum not to exceed by $210,000 to a revised sum not to exceed $654,600.
3. Except as modified and amended by this SECOND AMENDMENT to the AGREEMENT, all other provisions of the Agreement and Amendment shall remain unchanged and in full force and effect.
IN WITNESS WHEREOF, the CITY OF MODESTO, a Municipal Corporation, has authorized the execution of this Second Amendment to the AGREEMENT by its City Manager and attested by its City Clerk under authority of Resolution No. , adopted by the Council of the City of Modesto on the ___ day of ___________, 2024, and Fleet Tire Inc. dba Brannon Tire, Stockton, CA, has caused this Second Amendment to the Agreement to be duly executed. #5..
- 333 -
AGREEMENT TRANSMITTAL SHEET
Subject of Agreement: Vendor Name: Division:
Contact Person: Extension: Attorney Reviewer Name:
The attached agreement is the final agreement approved by Council on and pulled from Unity for routing via DocuSign.
The attached agreement is the final version approved through the under $50,000 Unity Workflow review and pulled from Unity for routing via DocuSign.
PINS Approval Business License
Council Agenda Report 700 Form (for Consultants)
Signed or Unsigned Resolution W-9
Council Meeting Minutes (Only if unsigned
Resolution is provided)
#5..
- 334 -
1 FIRST AMENDMENT FOR ON-SITE TIRE TECHNICIAN AGREEMENT WITH FLEET TIRE, INC dba BRANNON TIRE
This First Amendment to the Agreement for On-Site Tire Technician (“First Amendment”) is entered into between the CITY OF MODESTO, a municipal corporation of the State of California (hereinafter the “City”) and Fleet Tire, Inc dba Brannon Tire, a corporation of the State of California (hereinafter “Contractor”) is entered into by the parties on _______________, 2023.
RECITALS
This First Amendment is made with regard to the following recitals:
WHEREAS, City and Contractor previously entered into an Agreement #159091 for On-Site Tire Technician on the 11th day of June, 2019 (the “Original Agreement”), and WHEREAS, City and Contractor desire to amend the Original Agreement to execute the 5th year extension option, and.
WHEREAS, City and Contractor desires to amend the provisions of the Original Agreement to include revised rates. All other provisions of the Original Agreement shall remain in effect.
NOW, THEREFORE, in consideration of this First Amendment, and the mutual promises, covenants, and stipulations contained in the Original Agreement and this First Amendment to Agreement, the parties agree as follows:
1. Section 3, “Term” shall be amended to include the following “YEAR FIVE EXTENSION;” June 10, 2023 THROUGH June 10, 2024.
2. Section 1 (f) “PRICING” shall be amended to include the following contracted rate of $141.00 per hour with a per trip charge of $52.25, not to exceed $88,920 annually.
#5..
- 335 -
2 3. Except as provided for in this First Amendment, all other terms and conditions of the Original Agreement shall remain in full force and effect.
IN WITNESS WHEREOF, the City of Modesto, a municipal corporation, has authorized the execution of this First Amendment to Agreement for On-Site Tire Technician by its City Manager and attestation by its City Clerk on the ________ day of ___________, 2023, and Fleet Tire, Inc dba Brannon Tire has caused this First Amendment to be duly executed. #5..
- 336 -
CITY OF MODESTO,
a municipal corporation
BY: ____________________________
JOSEPH P. LOPEZ, City Manager
ATTEST:
(Seal)
BY: ____________________________
DIANE NAYARES-PEREZ, CMC,
City Clerk
________________________________ BY: ____________________________ By _____________________________
Name Title
BY: ____________________________
By _____________________________
Name Title
APPROVED AS TO FORM:
BY: ____________________________
JOSE M. SANCHEZ, City Attorney
APPROVED AS TO FORM:
BY: ____________________________
JOE F. RODRIGUEZ, Risk Manager
Federal ID # ___________
#5..
- 337 -
#5..
- 338 -
#5..
- 339 -
#5..
- 340 -
#5..
- 341 -
#5..
- 342 -
#5..
- 343 -
#5..
- 344 -
#5..
- 345 -
#5..
- 346 -
#5..
- 347 -
#5..
- 348 -
#5..
- 349 -
#5..
- 350 -
#5..
- 351 -
#5..
- 352 -
= e
General Liability
Manual Entry
Automobile Liability
Manual Entry
Excess
Manual Entry
Workers Compensation
Agent
e
#5..
- 353 -
#5..
- 354 -
#5..
- 355 -
#5..
- 356 -
#5..
- 357 -
#5..
- 358 -
#5..
- 359 -
#5..
- 360 -
#5..
- 361 -
#5..
- 362 -
#5..
- 363 -
#5..
- 364 -
#5..
- 365 -
#5..
- 366 -
#5..
- 367 -
CITY OF MODESTO
COMMITTEE AGENDA REPORT
DATE OF MEETING:
May 20, 2024
Date: April 30, 2024
TO: Finance Committee
Nick Bavaro, Chair
Rosa Escutia-Braaton, Vice-Chair
David Wright, Member
THROUGH: Joseph P. Lopez, City Manager
FROM: Bill Sandhu, Director of Public Works
SUBJECT: Second Amendment to the Agreement with Hunt & Sons, Inc.
CONTACT: Patrick Crowley, Senior Public Works Manager, [email protected], 209-342-2274
DESCRIPTION:
Consider the Second Amendment for bulk oils and lubricants with Hunt & Sons, Inc., Ceres, CA, to a revised total amount of $1,743,201, and forwarding to Council for approval. (Funding Source:
Fleet Management Fund)
STRATEGIC PLAN ELEMENT:
This item is in conformance with City of Modesto Strategic Plan Area: Governance and Service Delivery: “build community trust in City government through responsive, transparent and efficient service delivery”; Goal J: “build a high-performance organization”.
BACKGROUND:
On November 4, 2020, by Resolution No. 2020-462, Hunt & Sons entered into an agreement with the City of Modesto to provide bulk oils and lubricants for the City of Modesto Fleet Services Division, for an estimated annual amount of $97,320 and a total amount not to exceed $486,602 over a five-year period. On September 14, 2021, by Resolution No. 2021-365, Hunt & Sons entered into the first amendment to the agreement with the City of Modesto to provide bulk oils and lubricants for the City of Modesto Fleet Services Division for an annual estimated cost increase of $91,320 from $97,320 to $188,640 and a total revised not to exceed amount increased by $456,599 from $486,602 to a new total amount of $943,201.
The agreement originally established with Hunt and Sons was based on an estimate of purchases from the three previous fiscal years. Since the initial terms of the agreement, the Fleet Services Division has acquired 150 additional units from Ceres and Oakdale Fire Departments, Ceres and Escalon Transit as well as additional City owned vehicles. The Fleet Services Division also provides service and maintenance for the Stanislaus Regional Transit Authority (StanRTA) JPA which included an 25 additional full-size transit buses. #6..
- 368 -
Finance Committee, May 20, 2024
Second Amendment to the Agreement with Hunt & Sons
The oils and lubricants are essential to Modesto’s fleet services. All the oils and lubricants provided in this agreement are utilized in maintaining the City’s fleet of vehicles and equipment in a safe and reliable condition. All the oils and lubricants are currently being pumped in bulk tanks.
The bulk tanks contain several different fluids such as, automatic transmission fluid, light duty and heavy-duty engine oil, transmission oil, coolant, diesel exhaust fuel, tractor fluid, gear oil, and grease. The tank capacities range from 250 gallons to 500 gallons. These items are used for the various vehicles owned and/or operated by the City of Modesto.
DISCUSSION:
The Second Amendment requesting annual estimated cost increase to the purchasing agreement originally established with Hunt and Sons was based on an estimate of purchases from the four previous fiscal years. Since that time, the Fleet Services Division has acquired 150 additional units from five additional Fire Districts, Stanislaus Regional Transit Authority (StanRTA) Transit as well as additional internal City equipment services to meet community expectations and service levels. The Fleet Services Division manages service and maintenance services for approximately 1,300 pieces of equipment, including 114 Fire Apparatus and over 130 buses.
There has been an increase in the purchase of oil and lubricants this past year due to aging fleet and an increased number of units which accounts for the increased demand for fluids use and cost, along with unforeseen product shortages and price increases as observed throughout the automotive industry.
Staff will be initiating a new Request for Proposal to advertise bulk fluids and oils to area vendors to verify the lowest cost services to the City. This process will allow bulk supply vendors to participate in bidding opportunities for providing these products to the Public Works Fleet Services Division.
Being able to bulk purchase the oils and lubricants needed to provide service and maintenance for our customers is not only critical for our operations, but it is critical for the citizens of Modesto and Stanislaus County.
Modesto Municipal Code Section 8-3.203 generally requires all purchases which meet or exceed $100,000 for material, equipment, or contractual services to be formally bid. However, exceptions to the formal bidding process are granted in MMC 8-3.204 (f) “Where the Purchasing Manager, in his or her discretion, determines that it is appropriate to amend the services or goods provided under an existing agreement to include additional similar goods or services, of limited quantity or scope, in order to increase efficiency and avoid delays or disruptions to City projects or services.
With the increase of usage due to fleet inventory and the competitive pricing already obtained through this agreement, the increase of these agreements amount will ensure the City obtains discount pricing.
FISCAL IMPACT:
Sufficient funds are budgeted for the remainder of this contract term to cover the annual cost increases. Due to the circumstances articulated in the background and discussion sections, additional funding in the amount of $800,000 will be required to maintain operations for the duration of this agreement. Approximately 40% of these expenditures will be billed to StanRTA and the contracted Fire Districts. The expenses related to this contract are paid from the Fleet Management Fund 5400. They are recovered through the Fleet Internal Service Fund (ISF) #6..
- 369 -
Finance Committee, May 20, 2024
Second Amendment to the Agreement with Hunt & Sons
through the monthly Operating & Maintenance billing. The expenses related to the Stanislaus County Transit vehicles are recovered monthly by direct billing.
Agreement Term Average Annual
1 $150,743.63
2 $242,530.82
3 $320,163.39
4 (YTD) $223,065.00
Total Cost (YTD) $936,475.84
RECOMMENDED COMMITTEE ACTION:
Staff Recommendations:
Motion recommending the Second Amendment for the purchase of Bulk Oils and Lubricants with Hunt & Sons Inc., Ceres, CA, for an increase by $800,000 to a new total amount of $1,743,201 over the remaining duration of the agreement and forwarding to Council for approval.
Approved by:
Bill Sandhu, Public Works Director
Joseph P. Lopez, City Manager
Attachments:
1. Amendment #2
2. Amendment #1
3. Hunt & Sons Executed Agreement
#6..
- 370 -
1 SECOND AMENDMENT TO AGREEMENT
FOR THE BULK OIL AND LUBRICANTS WITH HUNT & SONS, INC.
This second amendment to the Agreement for Bulk Oils and Lubricants, hereinafter referred to as the SECOND AMENDMENT, is made and entered into in the City of Modesto, State of California, this ____ day of_____________, 2024, by and between the City of Modesto, a municipal corporation of the State of California, hereinafter referred to as CITY, and HUNT & SONS INC., Modesto, CA, hereinafter referred to as CONTRACTOR.
This SECOND AMENDMENT to the AGREEMENT is made with reference to the following recitals:
A. Agreement No. 191491, hereinafter referred to as AGREEMENT, was entered into by and between CITY and CONTRACTOR on the 4th day of November 2020 for bulk oils and lubricants.
B. The CITY and CONTRACTOR adopted the first amendment on September 14, 2021 to amend Section 3 “Compensation” amending the total sum not to exceed $943,201.
C. The CITY and CONTRACTOR desire to amend the AGREEMENT by increasing the previously approved sum not to exceed by $800,000 to a revised sum not to exceed $1,743,201 through the term of the agreement.
D. CITY and CONTRACTOR now desire to memorialize the change to the terms of the AGREEMENT with this SECOND AMENDMENT.
NOW, THEREFORE, the parties hereto mutually agree to the following:
1. Section 3 “Compensation” shall be amended to increase the sum not to exceed by $800,000 to a revised sum not to exceed $1,743,201.
2. Except as modified and amended by this SECOND AMENDMENT to the AGREEMENT, #6..
- 371 -
2 all other provisions of the Agreement and Amendment shall remain unchanged and in full force and effect.
IN WITNESS WHEREOF, the CITY OF MODESTO, a Municipal Corporation, has authorized the execution of this Second Amendment to the AGREEMENT by its City Manager and attested by its City Clerk under authority of Resolution No. , adopted by the Council of the City of Modesto on the ___ day of ___________, 2024, and HUNT & SONS INC., MODESTO, CA, has caused this Second Amendment to the Agreement to be duly executed. #6..
- 372 -
FIRST AMENDMENT TO AGREEMENT
FOR BULK OILS AND LUBRICANTS WITH HUNT & SONS INC.
This First Amendment (“Amendment”) is made to that certain Agreement for Bulk Oils and Lubricants with Hunt & Sons entered into by and between the CITY OF MODESTO, a municipal corporation of the State of California (hereinafter the “City”) and HUNT & SONS INC., a California corporation (hereinafter “Contractor”), on November 4, 2020, hereinafter referred to as “Agreement.”
RECITALS
WHEREAS, City and Contractor entered into an agreement for Contactor to provide bulk oils and lubricants for the City; and
WHEREAS, Contractor agreed to accept a sum not to exceed $943,201 as full remuneration for bulk oils and lubricants provided on an as-needed basis; and WHEREAS, City intends to add and replace a line item in the Agreement because it will be more efficient for the Bus Maintenance Facility; and WHEREAS, the product shall be universal and can be used on most City vehicles; and
WHEREAS, the product shall result in cost savings for the City.
NOW, THEREFORE, in consideration of the mutual promises, covenants, and stipulations contained in the Agreement for Bulk Oils and Lubricants and this Amendment to Agreement, the parties agree as follows:
1. Section 3 titled “Compensation” shall state, “Contractor shall agree to accept the sum not to exceed $943,201 as full remuneration for all goods and services called for in Exhibit “A” and for performance by Contractor of all of its duties and obligations under this agreement.”
DocuSign Envelope ID: E09B349C-E8C1-44A3-AF94-9D10CC8373D7 #6..
- 373 -
2. Section 3 titled “Compensation”, line item number 8, “Purus 50/50 Coolant” in the amount of $5.99/gallon for an estimated quantity of 1,075 gallons per year will be changed to “Zerex HD Nitrite Free” in the amount of $6.50/gallon for an estimated quantity of 3,000 gallons per year.
3. Except as otherwise modified by this Amendment, the Agreement remains in full force and effect.
IN WITNESS WHEREOF, the City of Modesto, a municipal corporation, has authorized the execution of this Amendment to Agreement for Consultant Services in duplicate by its City Manager and attestation by its City Clerk under authority of Resolution No. 2021- , adopted by the Council of the City of Modesto on the ________ day of ___________, 2021, and HUNT & SONS INC. has caused this Agreement to be duly executed in duplicate as of the Effective Date.
DocuSign Envelope ID: E09B349C-E8C1-44A3-AF94-9D10CC8373D7 September
365
14th
#6..
- 374 -
DocuSign Envelope ID: 10781728-88BA-4580-94DF-9EE41C8ECDB3 November
4th
DocuSign Envelope ID: E09B349C-E8C1-44A3-AF94-9D10CC8373D7 #6..
- 375 -
DocuSign Envelope ID: 10781728-88BA-4580-94DF-9EE41C8ECDB3 DocuSign Envelope ID: E09B349C-E8C1-44A3-AF94-9D10CC8373D7 #6..
- 376 -
DocuSign Envelope ID: 10781728-88BA-4580-94DF-9EE41C8ECDB3 DocuSign Envelope ID: E09B349C-E8C1-44A3-AF94-9D10CC8373D7 #6..
- 377 -
DocuSign Envelope ID: 10781728-88BA-4580-94DF-9EE41C8ECDB3 DocuSign Envelope ID: E09B349C-E8C1-44A3-AF94-9D10CC8373D7 #6..
- 378 -
DocuSign Envelope ID: 10781728-88BA-4580-94DF-9EE41C8ECDB3 DocuSign Envelope ID: E09B349C-E8C1-44A3-AF94-9D10CC8373D7 #6..
- 379 -
DocuSign Envelope ID: 10781728-88BA-4580-94DF-9EE41C8ECDB3 DocuSign Envelope ID: E09B349C-E8C1-44A3-AF94-9D10CC8373D7 #6..
- 380 -
DocuSign Envelope ID: 10781728-88BA-4580-94DF-9EE41C8ECDB3 DocuSign Envelope ID: E09B349C-E8C1-44A3-AF94-9D10CC8373D7 #6..
- 381 -
DocuSign Envelope ID: 10781728-88BA-4580-94DF-9EE41C8ECDB3 DocuSign Envelope ID: E09B349C-E8C1-44A3-AF94-9D10CC8373D7 #6..
- 382 -
DocuSign Envelope ID: 10781728-88BA-4580-94DF-9EE41C8ECDB3 DocuSign Envelope ID: E09B349C-E8C1-44A3-AF94-9D10CC8373D7 #6..
- 383 -
DocuSign Envelope ID: 10781728-88BA-4580-94DF-9EE41C8ECDB3 11/24/2020
11/17/2020
11/17/2020
11/17/2020
Jiles Smith,
Risk Manager
DocuSign Envelope ID: E09B349C-E8C1-44A3-AF94-9D10CC8373D7 #6..
- 384 -
CITY OF MODESTO
COMMITTEE AGENDA REPORT
DATE OF MEETING:
May 20, 2024
Date: April 26, 2024
TO: Finance Committee
Nick Bavaro, Chair
Rosa Escutia-Braaton, Vice Chair
David Wright, Member
THROUGH: Joseph P. Lopez, City Manager
FROM: William Wong, Director of Utilities
SUBJECT: On-Call Electrical Engineering & Architectural Design Services Agreements CONTACT: Edgar Vargas, Senior Civil Engineer, [email protected], 209-577-5424 DESCRIPTION:
Consider an On-Call Electrical Engineering Design Services Agreement with Pezzoni Engineering, Inc, of Modesto, CA for a total amount not to exceed $300,000 over three years, and an On-Call Architectural Design Services Agreement with Red Inc. Architects, of Modesto, CA, for a total amount not to exceed $300,000 over three years and forwarding to Council for approval. (Funding Source: Various Capital Improvement Program Projects) STRATEGIC PLAN ELEMENT:
The recommended action supports the 2020-2025 City of Modesto Strategic Plan Initiatives, Goal D: Provide safe, efficient, and reliable infrastructure through proactive community investment, maintenance, and sustainability efforts.
BACKGROUND:
Capital Improvement Program (CIP) projects may require outside consultant services for efficient project delivery; retaining on-call professional service consultants allows the Utilities Department to have quick access to specialized electrical engineering and architectural design services and eliminates the need to send out repetitive Requests for Qualifications for projects of similar scope and/or type, thereby saving staff time and project costs. On-call consultants are primarily utilized to provide design services for small projects using experienced staff in time sensitive situations, which is essential to the efficient implementation of the City’s CIP projects.
DISCUSSION:
In accordance with Administrative Directive 3.1, Selection Procedures for Professional Consultants Who Provide Architectural & Engineering Services for Capital Projects, a Request for Qualifications was formally advertised through Planet Bids for On-Call Electrical Engineering and Architectural Design Services. On March 12, 2024, staff received five Statements of #7..
- 385 -
Finance Committee, May 20, 2024
On-Call Electrical Engineering & Architectural Design Services Agreements
Qualifications (SOQ) for Electrical Engineering Design Services, and one SOQ for Architectural Design Services.
After careful review by a selection committee comprised of Utilities Department staff, the following firms were selected as the most qualified to provide on-call services:
Electrical Engineering Design Services Pezzoni Engineering, Inc. Architectural Design Services Red Inc Architects
When on-call professional services are required a written task order will be issued to the consultant identifying the agreed upon scope, cost, and schedule to complete the specific task(s).
In accordance with Modesto Municipal Code 8-3.204(a), “Exceptions to Formal Bidding Requirements”, Agreements for Professional Services are exempt from the bidding requirements of Modesto Municipal Code 8-3.203 if competitive quotations or proposals have been sought informally from at least three (3) qualified entities. The approval of On-Call Agreements for Electrical Engineering and Architectural Design Services to Pezzoni Engineering, Inc. and Red Inc Architects, respectively, conforms to Modesto Municipal Code 8-
3.204, subsection (a) as they are providing professional services and at least three informal proposals were obtained.
FISCAL IMPACT:
Costs for On-Call Electrical Engineering and Architectural Design Services are not expected to exceed $200,000 per year. The total costs for the proposed three-year Agreements (initial oneyear term, with two one-year extension options) are not to exceed $300,000 per consultant Agreement.
No new budget allocations are required at this time as task orders associated with these OnCall Agreements will be project specific and encumbered against existing approved CIP budgets.
RECOMMENDED COMMITTEE ACTION:
Staff Recommendations:
Motion recommending an On-Call Electrical Engineering Design Services Agreement with Pezzoni Engineering, Inc., of Modesto, CA for a one-year Agreement with two one-year extension options, for an annual estimated amount of $100,000, and a total amount not to exceed $300,000 over three years; and forwarding to Council for approval.
Motion recommending an On-Call Architectural Design Services Agreement with Red Inc.
Architects, of Modesto, CA for a one-year Agreement with two one-year extension options, for an annual estimated amount of $100,000, and a total amount not to exceed $300,000 over three years; and forwarding to Council for approval.
Approved by:
William Wong, Director of Utilities
Joseph P. Lopez, City Manager
#7..
- 386 -
Finance Committee, May 20, 2024
On-Call Electrical Engineering & Architectural Design Services Agreements
Attachments:
1. On-Call Electrical Engineering Design Services Agreement & Exhibits Pezzoni Engineering, Inc.
2. On-Call Architectural Design Services Agreement & Exhibits Red Inc. Architects
3. Bid Waiver
#7..
- 387 -
-1-
ON-CALL AGREEMENT FOR ELECTRICAL ENGINEERING DESIGN SERVICES THIS AGREEMENT, made and entered into in the City of Modesto, State of California, this day of , 2024, (“Effective Date”) by and between the CITY OF MODESTO, a municipal corporation of the State of California, hereinafter referred to as "City", and PEZZONI ENGINEERING, INC., a California Corporation, hereinafter referred to as "Consultant".
This Agreement is made with regard to the following recitals:
A. City has determined that there is a need for On-Call Electrical Engineering Design Services.
B. Consultant represents that it is qualified, willing and able to provide the requested On-Call Electrical Engineering Design Services.
NOW, THEREFORE, in consideration of this agreement, and the mutual promises, covenants, and stipulations hereinafter contained, the parties agree as follows:
1. SCOPE OF SERVICES.
Services to be provided by Consultant under this agreement shall generally fall under, but are not limited to, one or more of the categories as set forth and described in the documents attached hereto and referred to as Exhibit "A".
Specific scope(s) of services to be provided by Consultant shall be further defined by and authorized by City through the issuance of project-specific Task Orders. Each specific Task Order will require a written, scope outlining the specific services to be provided by Consultant, the schedule for completion, and the proposed compensation amount(s) and payment methodology to perform the specified services. The City must authorize each Task Order in writing prior to commencement of services by the Consultant. #7..
- 388 -
-2-
The Consultant shall perform the services, as described in Exhibit "A" to this Agreement and subsequent Task Orders, in a manner compatible with the standards of its profession, and shall produce a fully complete project that is acceptable to City.
2. TERM OF AGREEMENT.
This Agreement is effective as of the date first written above and will continue in effect until City's acceptance of and payment for all services authorized by City and performed by Consultant, or one (1) year from the above date, whichever occurs latter, with the possibility of two (2) one (1) year extension options, at the sole discretion of City, unless terminated earlier in accordance with the provisions of the termination clause in this Agreement.
City hereby gives Consultant notice to proceed with the provision of services described in Exhibit "A" to this Agreement, as of the Effective Date of this agreement.
Consultant shall diligently proceed with the work and agrees to complete said specific scope(s) of services within the time period set forth in each respective Task Order.
3. COMPENSATION.
Consultant agrees to accept an estimated amount of ONE HUNDRED THOUSAND AND 00/100 DOLLARS ($100,000) per year, and a total amount not to exceed THREE HUNDRED THOUSAND AND 00/100 DOLLARS ($300,000) over three years as of the Effective Date as full remuneration for performing all services and furnishing all staffing and materials called for in Exhibit "A”, and subsequent Task Orders, and for performance by Consultant of all of its duties and obligations under this Agreement.
The Compensation shall be paid pursuant in the manner and at the times set forth below:
#7..
- 389 -
-3-
City shall pay Consultant for work performed as authorized by subsequent Task Orders. All work shall be billed: 1) on a time and materials basis, at the hourly rates set forth in Exhibit “B”, attached hereto, or; 2) on a lump sum, fixed fee basis, as authorized by City per specific Task Order(s). Lump sum fees shall generally be in accordance with approximate amounts as shown in Exhibit “B”. Unless otherwise approved by City, the hourly rates and lump sum fees shown in Exhibit “B” shall remain in effect for the entire term of the agreement, including all extensions.
Consultant shall submit monthly invoices to City which include a detailed description of completed tasks, hours worked, and billable rates or percentage complete (for lump sum tasks) for all work completed, and detailed receipts for any out-of-pocket costs paid by Consultant in connection with work performed on this Project.
4. OBLIGATIONS OF CONSULTANT.
Throughout the term of this Agreement, Consultant shall possess, or secure all licenses, permits, qualifications and approvals legally required to conduct business.
Consultant warrants that it has all of the necessary professional capabilities and experience, as well as all tools, instrumentalities, facilities and other resources necessary to provide the City with the services contemplated by this Agreement. Consultant further warrants that it will follow the best current, generally accepted and professional practices to make findings, render opinions, prepare factual presentations, and provide professional advice and recommendations regarding this project.
5. PERFORMANCE BY KEY EMPLOYEE.
Consultant has represented to City that Kevin Pezzoni, PE will be the person primarily responsible for the performance of the services referred to in this Agreement. #7..
- 390 -
-4-
City has entered into this Agreement in reliance on that representation by Consultant. Consultant therefore agrees that ten percent (10%) or more of the time to be devoted to the project that is the subject of this Agreement will be that of the above-named person.
6. OWNERSHIP OF DOCUMENTS/TITLE TO DATA.
Ownership of Documents
All reports, drawings, designs, graphics, working papers and other incidental work or materials furnished hereunder shall become and remain the property of the City, and may be used by City as it may require without any additional cost to City. No reports shall be used by the Consultant for purposes other than this contract without the express prior written consent of City.
Title to Data
If, as a part of the agreement, Consultant is required to produce data such as, but not limited to, drawings, plans, specifications, calculations, models, flow diagrams, visual aids and other related materials, the originals of all such data generated under this agreement will be delivered to City upon the completion or termination of services under the contract.
All materials, documents, data or information obtained from the City data files or any City medium furnished to Consultant in the performance of this Agreement will at all times remain the property of the City. Such data or information may not be used or copied for direct or indirect use by Consultant after termination of this Agreement without written consent of the City.
7. NEWS AND INFORMATION RELEASE.
Consultant agrees that it will not issue any news releases in connection with either the award of this Agreement, or any subsequent amendment of or efforts under this #7..
- 391 -
-5-
Agreement, without first obtaining review and approval of said news releases from City through the City Manager.
8. INTEREST OF CONTRACTOR.
Consultant warrants that it presently has no interest and shall not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of services required to be performed under this Agreement. Consultant warrants that, in performance of this Agreement, Consultant shall not employ any person having any such interest. Consultant agrees to file a Statement of Economic Interests with the City Clerk at the start and end of this contract if so required at the option of City.
9. AMENDMENTS.
Both parties to this Agreement understand that it may become desirable or necessary during the execution of this Agreement, for City or Consultant to modify the scope of services provided for under this Agreement. Any material extension or change in the scope of work shall be discussed with City and the change and cost shall be memorialized in a written amendment to the original contract prior to the performance of the additional work.
Until a change order is so executed, City will not be responsible to pay any charges Consultant may incur in performing such additional services, and Consultant shall not be required to perform any such additional services.
10. INDEPENDENT CONTRACTOR.
All acts of Consultant, its agents, officers, and employees and all others acting on behalf of Consultant relating to the performance of this Agreement, shall be performed as independent contractors and not as agents, officers, or employees of City. Consultant, by virtue of this Agreement, has no authority to bind or incur any obligation on behalf of City. #7..
- 392 -
-6-
Consultant has no authority or responsibility to exercise any rights or power vested in the City.
No agent, officer, or employee of the City is to be considered an employee of Consultant. It is understood by both Consultant and City that this Agreement shall not under any circumstances be construed or considered to create an employer-employee relationship or a joint venture.
Consultant, its agents, officers and employees are and, at all times during the terms of this Agreement, shall represent and conduct themselves as independent contractors and not as employees of City.
Consultant shall determine the method, details and means of performing the work and services to be provided by Consultant under this Agreement. Consultant shall be responsible to City only for the requirements and results specified in this Agreement, and, except as expressly provided in this Agreement, shall not be subjected to City's control with respect to the physical action or activities of the Consultant in fulfillment of this Agreement. Consultant has control over the manner and means of performing the services under this Agreement.
Consultant is permitted to provide services to others during the same period service is provided to City under this Agreement. If necessary, Consultant has the responsibility for employing other persons or firms to assist Consultant in fulfilling the terms and obligations under this Agreement.
If in the performance of this Agreement any third persons are employed by Consultant, such persons shall be entirely and exclusively under the direction, supervision, and control of Consultant. All terms of employment including hours, wages, working conditions, discipline, hiring, and discharging or any other term of employment or requirement of law shall be determined by the Consultant.
#7..
- 393 -
-7-
It is understood and agreed that as an independent contractor and not an employee of City neither the Consultant or Consultant's assigned personnel shall have any entitlement as a City employee, right to act on behalf of the City in any capacity whatsoever as an agent, or to bind the City to any obligation whatsoever.
It is further understood and agreed that Consultant must issue W-2 forms or other forms as required by law for income and employment tax purposes for all of Consultant's personnel.
As an independent contractor, Consultant hereby indemnifies and holds City harmless from any and all claims that may be made against City based upon any contention by any third party that an employer-employee relationship exists by reason of this Agreement.
11. ASSIGNMENT.
Neither this Agreement nor any portion thereof shall be subcontracted or assigned without the express prior written consent of the City in each and every instance.
12. PATENT/COPYRIGHT MATERIALS.
Unless otherwise expressly provided in the contract, Consultant shall be solely responsible for obtaining the right to use any patented or copyrighted materials in the performance of this Agreement. Consultant shall furnish a warranty of such right to use to City at the request of City.
13. NOTICES.
Notice required by this Agreement shall be given in writing and shall be deemed given and effective upon receipt provided that such are delivered in accordance with the provisions of this Section. Notices shall be delivered either by: (a) personal delivery (including delivery by an overnight courier service which obtains confirmation of receipt); or (b) by #7..
- 394 -
-8-
facsimile, provided that such transmission is followed by delivery by an overnight courier service which obtains confirmation of receipt; or (c) postage prepaid, return receipt requested, certified mail; or (d) by electronic transmission subject to reasonable proof that the notice was both transmitted and received. Each such notice shall be sent to the parties at the address respectively set forth below or to such other address as a party may designate by written notice given in accordance with the provisions of this Section:
FOR CONSULTANT: Name: Pezzoni Engineering, Inc.
Address: 1150 9th Street, Suite 1415
Modesto, CA 95354
Attention: Kevin Pezzoni
Phone: (209) 554-4602
Email: [email protected]
FOR CITY: Name: City of Modesto
Address: 1010 10th Street, Suite 4600
Modesto, CA 95354
Attention: Edgar Vargas
Phone: (209) 577-5424
Email: [email protected]
14. INSURANCE REQUIREMENTS.
The Consultant shall provide at its own expense and maintain at all times the following insurance with insurance companies licensed in the State of California and shall provide evidence of such insurance to the City as may be required by the Risk Manager of the City. The policies or certificates thereof shall provide that, thirty (30) days prior to cancellation or material change in the policy, notices of same shall be given to the Risk Manager of the City by certified mail, return receipt requested, for all of the following stated insurance policies.
In the event the certificates of insurance required hereunder do not provide for notice of cancellation to the certificate holder and/or additional insureds, the Consultant shall #7..
- 395 -
-9-
provide, and shall require its subcontractors to provide, as an express condition precedent to payment hereunder, an endorsement from their insurers providing that the additional insureds identified herein shall be provided 30 days notice of the cancellation on the policies of insurance required hereunder (10 days notice if the policies are cancelled for non-payment of premium). In addition, the named insured on all such policies shall provide to the additional insureds identified herein any notices of cancellation of said insurance policies within 5 business days of receipt of such notice. The Consultant shall, as a further express condition precedent to payment for work performed, affirm under penalty of perjury that the required insurance on the project remains in place and said insurance has not been cancelled.
(a) Worker's Compensation in compliance with the statutes of the State of California, plus employer's liability with a minimum limit of liability of $1,000,000. (b) General Liability insurance with a minimum limit of liability per occurrence of $1,000,000 for bodily injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. This insurance shall indicate on the certificate of insurance the following coverages and indicate the policy aggregate limit applying to: premises and operations; broad form contractual; independent consultants and subcontractors; products and completed operations as applicable.
(c) Automobile Liability insurance with a minimum limit of liability per occurrence of $1,000,000 for bodily injury and property damage. This insurance shall cover any automobile for bodily injury and property damage.
#7..
- 396 -
-10-
(d) Professional Liability insurance with a minimum limit of $1,000,000 per claim and policy aggregate. If coverage is on a claims made basis it shall be maintained for at least three (3) years following completion of the work.
If at any time any of said policies shall be unsatisfactory to the City, as to form or substance, or if a company issuing such policy shall be unsatisfactory to the City, the Consultant shall promptly obtain a new policy, submit the same to the Risk Manager for approval and submit a certificate thereof as hereinabove provided. Upon failure of the Consultant to furnish, deliver or maintain such insurance and certificates as above provided, this Agreement, at the election of the City, may be forthwith declared suspended or terminated.
Failure of the Consultant to obtain and/or maintain any required insurance shall not relieve the Consultant from any liability under this Agreement, nor shall the insurance requirements be construed to conflict with or otherwise limit the obligations of the Consultant concerning indemnification. The City, its agents, officers, employees, and volunteers shall be named as an additional insured on all insurance policies required herein, except Workers' Compensation and Professional Liability. The Workers' Compensation insurer shall agree to waive all rights of subrogation against the City, its agents, officers, employees, and volunteers for losses arising from work performed by Consultant for the City. The Consultant's insurance policy(ies) shall include a provision that the coverage is primary as respects the City; shall include no special limitations to coverage provided to additional insured; and, shall be placed with insurer(s) with acceptable Best's rating of A:VII or with approval of the Risk Manager. The Consultant must deliver certificates evidencing existence of the insurance listed above to the City prior to the time the contract is signed.
#7..
- 397 -
-11-
CONSULTANT shall provide CITY with separate endorsements evidencing proof of the CITY’s additional insured status as to both the general liability and automobile liability insurance policies. In addition, CONSULTANT shall provide CITY with a Workers Compensation subrogation waiver by way of a separate endorsement. All endorsements referenced above must include the applicable policy number.
For any claims related to this project, the CONSULTANT’S insurance coverage shall be primary insurance as respects the Entity, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the Entity, its officers, officials, employees, or volunteers shall be excess of the CONSULTANT’S insurance and shall not contribute with it.
15. TERMINATION OF AGREEMENT.
Termination by City for Default of Consultant
Should Consultant default in the performance of this Agreement or materially breach any of its provisions, at its option, City may terminate this Agreement by giving written notification to Consultant. The termination date shall be the effective date of the notice. For the purposes of this section, material breach of this Agreement shall include, but not be limited to, any of the following: failure to perform required services or duties, willful destruction of City's property by Consultant, dishonesty or theft.
Termination by City for Convenience
The City may also terminate the Consultant's performance under the Agreement, either in whole or in part, at its own discretion, or when conditions encountered during the Work make it impossible or impracticable to proceed, or when the City is prevented from proceeding with the Agreement by act of God, by law, or by official action of a public authority, or upon a #7..
- 398 -
-12-
determination by the City that such termination is in the best interest and convenience of the City, or whenever the City is prohibited from completing the Work for any reason. The City shall provide no less than ten (10) calendar days written notice of its intent to terminate the Agreement for convenience, and shall endeavor to provide the Consultant with consultation with the City prior to termination.
Post-Termination Procedure
Upon receipt of a written notice of termination pursuant to either of the foregoing paragraphs, the Consultant shall:
a. Cease its work as directed in the notice of termination as of the termination date and see to it that its employees, subconsultants and agents are notified of such termination and act as specified in the notice of termination;
b. Terminate all orders and Subcontractors except as necessary to complete any portion of the Work that is not terminated; c. If directed in writing by the City to do so, assign all right, title and interest in subcontracts and materials in progress to City, in which case the City will have the right at its discretion to settle, or pay any or all claims arising out of the termination of such subconsultants, but in no event shall recovery by any Consultant or subconsultant include lost profits for portions of the Work not completed or undertaken, including materials not delivered; d. Deliver or otherwise make available to the City all data, drawings, specifications, reports, estimates, summaries and such #7..
- 399 -
-13-
other information and material as may have been accumulated by the Consultant in performing the Work whether completed or in process; e. Settle outstanding liabilities and claims, subject to the approval of City;
f. Complete performance of such part of the Work as has not been terminated;
g. Take such other actions as may be necessary, or as may be directed by the City for the protection and preservation of the Work and/or property related to the Work;
h. If City so requests, and at City's cost, Consultant shall provide sufficient oral or written status reports to make City reasonably aware of the status of Consultant's work on the project. i. The Consultant understands and agrees that City may, in City's sole discretion, refuse to pay Consultant for that portion of Consultant's services which were performed by Consultant on the project prior to the termination date and which remain
unacceptable and/or not useful to City as of the termination date.
City will pay Consultant an amount based on the percentage of satisfactory work completed in accordance with the notice of termination. The final payment to the Consultant after termination for convenience shall be limited to amounts due and owing under the Agreement at time of termination, including the following:
a. The cost of settling and paying valid claims arising out of the termination of the Work such as subconsultant agreements or #7..
- 400 -
-14-
contracts for materials;
b. The Agreement price allocable to the portion of the Work properly performed or goods supplied to the work site by the Consultant as of the date of termination, as determined in accordance with the notice of termination, reduced by any sums previously paid to the Consultant.
Authorization to Terminate Agreement
Termination of the Agreement may be invoked by the City Manager, or his/her designee, subject to the right of the Consultant to appeal the City Manager, or his/her designee’s, decision to the City Council. The Consultant shall appeal by notifying the City Clerk in writing within ten (10) calendar days of receipt of written notification from City of termination of the Agreement. In the event that termination of this Agreement is upheld by the City Council, any cessation of payment of delay claims, extended claims, Eichleay claims, or any other claims for delay shall be retroactive to the date of termination selected by the City Manager, or his/her designee.
16. CERTIFIED PAYROLL REQUIREMENT.
For consultants performing field work on public works contracts on which prevailing wages are required: The Consultant shall comply with the provisions of Section 1776 of the California Labor Code, regarding payroll records, and shall require its subconsultants and subcontractors to comply with that section as may be required by law.
17. INDEMNITY.
The Consultant shall hold the City, its agents, officers, employees, and volunteers, harmless from and save, defend and indemnify them against any and all claims, #7..
- 401 -
-15-
losses, liabilities, judgments or damages from every cause, including but not limited to injury to person or property or wrongful death, including reasonable costs and expenses of defense of any judicial or administrative action, arising directly or indirectly out of any negligent or intentional act or omission of Consultant, or its agents, officers, employees, or volunteers relating to or during the performance of its obligations under this Agreement.
Consultant's obligation to defend, indemnify, and hold the City, its agents, officers, and employees harmless under the provisions of this paragraph is not limited to or restricted by any requirement in this Agreement for Consultant to procure and maintain a policy of insurance.
18. DISPUTE RESOLUTION.
All claims, controversies, or disputes arising out of, or relating to the formation of this Agreement, or the breach, termination execution, enforcement, interpretation, or validity of this Agreement, including the determination of the scope or applicability of this contract provision shall be determined by binding arbitration in Modesto, California by one arbitrator, except as otherwise specified in this Agreement. The American Arbitration Association shall administer the arbitration under its Arbitration Rules then in effect, subject to the modifications of those rules contained in this paragraph. This agreement to arbitrate shall be specifically enforceable under the prevailing law of any court having jurisdiction, and the award rendered by the arbitrator may be entered in any court having jurisdiction. The appropriate venue for any arbitration or court proceeding relating to or arising out of this provision shall be in Stanislaus County, California.
This paragraph is not intended to and does not waive the claim filing requirements found in California Government Code section 900 et seq. In the event that a timely #7..
- 402 -
-16-
and legally sufficient, arbitrable claim is filed by Consultant with City, and the claim is rejected in whole or in part by City, this paragraph shall result in the conclusive, final, and binding resolution of all the issues presented in the claim by Consultant so long as any issues presented by the claim are arbitrable. Claims rejected by City or by operation of law, shall be submitted by Consultant to arbitration pursuant to the Arbitration Rules of the American Arbitration Association within ninety (90) days after mailing of the written rejection by City to Consultant.
Otherwise, the claim or claims shall be deemed waived in their entirety.
The “fast track’ rules of the American Arbitration Association shall apply to any claim or counterclaim less than ONE HUNDRED FIFTY THOUSAND AND 00/100 ($150,000.00) DOLLARS. In arbitration not proceeding under the “fast track” rules, the arbitrator shall have the power to order that depositions be taken and other discovery be made.
Both City and Consultant shall have the right, upon written notice, to take no more than three (3) depositions of the other as a matter of right in an arbitration proceeding under the “fast track” rules.
Whether or not City and Consultant may be engaged in interstate commerce, any controversy or dispute mentioned above shall be determined by, and the parties shall be bound by, the substantive law of the State of California, and not the Federal Arbitration Act at 9 USC Section 1 et seq.
The arbitrator may grant any remedy or relief deemed by the arbitrator just and equitable under the circumstances, whether or not such relief could be awarded in a court of law. The arbitrator shall be empowered to award monetary sanctions against a party for failure of cooperation in the arbitration. The arbitrator shall, in written award, allocate all the costs of the arbitration, including the fees of the arbitrator and the reasonable attorney fees of the #7..
- 403 -
-17-
prevailing party, against the party who did not prevail. The prevailing party shall be the party in whose favor the majority of the central issues in the case are resolved.
Notwithstanding anything in this provision to the contrary, the arbitrator shall have no power to award punitive damages or other damages not measured by the party’s actual damages (excluding litigation costs and fees) against any party. This limitation of the arbitrator’s powers under this Agreement shall not operate as an exclusion of the issue of punitive damages from this Agreement to Arbitrate sufficient to vest jurisdiction in a court with respect to that issue.
Consultant shall include in all subcontracts a specification whereby the subcontractor consents to being joined in arbitration between City and Consultant involving the work of the subcontractor to be joined. Consultant’s failure to do so shall be a breach of this Agreement.
The parties hereby waive any rights provided by Title 9.2 of the California Code of Civil Procedure, Section 1296. The arbitrator’s award shall be deemed final, conclusive and binding to the fullest extent allowed by California law.
19. ENTIRE AGREEMENT.
This Agreement and its exhibits contain the entire understanding between Consultant and City. Additional or new terms contained in this Agreement which vary from Consultant's proposal are controlling and are deemed accepted by Consultant by shipment of any article or other commencement of performance hereunder. All previous proposals, offers and communications relative to this Agreement, whether oral or written, are hereby superseded except to the extent that they have been incorporated into this Agreement. No future waiver of #7..
- 404 -
-18-
or exception to any of the terms, conditions, and provisions of this Agreement shall be considered valid unless specifically agreed to in writing by all the parties.
20. PARTIAL INVALIDITY.
If any provision in this Agreement is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions shall nevertheless continue in full force without being impaired or invalidated in any way.
21. WAIVER.
The waiver by any party to this Agreement of a breach of any provision hereof shall be in writing and shall not operate or be construed as a waiver of any other or subsequent breach hereof unless specifically stated in writing.
22. AUDIT.
The City's duly authorized representative shall have access at all reasonable times to all reports, contract records, contract documents, contract files, and personnel necessary to audit and verify Consultant's charges to City under this Agreement.
Consultant agrees to retain reports, records, documents, and files related to charges under this Agreement for a period of four (4) years following the date of final payment for Consultant services. City's representative shall have the right to reproduce any of the aforesaid documents.
23. GOVERNING LAW.
This Agreement shall be governed according to the laws of the State of California.
#7..
- 405 -
-19-
24. HEADINGS NOT CONTROLLING.
Headings used in the Agreement are for reference purposes only and shall not be considered in construing this Agreement.
25. COMPLIANCE WITH LAWS.
Consultant shall insure compliance with all safety and hourly requirements for employees, in accordance with federal, state, and county safety and health regulations and laws. Consultant shall fully comply with all applicable federal, state, and local laws, ordinances, regulations and permits.
26. CITY BUSINESS LICENSE.
Consultant will have a City of Modesto business license.
IN WITNESS WHEREOF, the City of Modesto, a municipal corporation, has authorized the execution of this Agreement by its City Manager and attestation by its City Clerk under authority of Resolution No. 2024- , adopted by the Council of the City of Modesto on the day of , 2024, and PEZZONI ENGINEERING, INC. has caused this agreement to be duly executed as of the Effective Date. #7..
- 406 -
EXHIBIT A
SCOPE OF WORK
On-Call Electrical Engineering Services
The following outlines some of the typical services to be provided by the consultant. On-call tasks shall include, but are not limited to:
1. Meeting, as needed, with Staff and responding intelligently, proactively, and effectively to infrastructure Electrical demands, renewal and replacement needs, service demands, and regulatory issues directly affecting various City of Modesto Capital Improvement Program projects.
2. Assist Staff in the scope and documents for new or renewed electrical equipment, maintenance practices, and processes. The consultant may use whatever resource he has available including the firm he represents or contracting with an outside engineering firm.
3. Provide input and expertise, as needed, in the operations, maintenance, and the capital improvement projects proposed or being accomplished.
4. Act as liaison and project manager with Staff in order to insure legal and best practices of the City of Modesto are met.
5. Appearances at Council or sub-committees thereof, as required.
6. Meet, as required, with special consultants or independent professional associates requested or authorized by the City of Modesto.
7. Prepare Preliminary Electrical Studies, Reports, or Feasibility Studies for proposed or current Capital Improvement projects.
8. Prepare electrical design, specifications, and construction cost estimates for power, lighting, communications, control systems, or energy management.
9. Assistance with project bidding, submittal review, requests for information, and various on-site inspections.
The services described herein are to be performed for a period of one (1) year from the date of Council approval, and can be extended for two (2) additional one-year periods, at the sole discretion of City, by formal letters of written agreement between the City and Consultant and must be signed by both parties.
#7..
- 407 -
EXHIBIT A
The following services are less likely to be needed. The listing below is added to clarify possible assignments of the position.
1. Electrical Engineering work required to meet the requirements of regulatory or funding agencies that become effective subsequent to the date of this agreement. 2 Preparation for litigation, arbitration, or other legal or administrative proceedings, and appearances in court or at arbitration sessions.
3. Special Electrical reports as requested by the City of Modesto concerning facilities operation during the operation initial period.
4. Redesign and preparation or through subcontract of sketches or drawings and requiring significant effort to supplement the drawings and specifications as necessitated by field conditions which differ from the conditions shown on the contract drawings.
5. Services or through subcontract in making revisions to drawings and specifications occasioned by the acceptance of substitutions proposed by a contractor.
6. Services or through subcontract resulting from significant delays, changes, or price increases occurring as a direct or indirect result of material, equipment, or energy shortages.
7. Additional or extended services or through subcontract during construction made necessary by (1) work damaged by fire or other cause during construction, (2) a significant amount of defective or neglected work by a Contractor, (3) acceleration of the process schedule involving service beyond normal working hours, (4) default by the Contractor, and (5) failure of the Contractor to complete the work within the construction contract time.
8. Evaluation of or through subcontract unusually complex claims or an unreasonable or extensive number of claims submitted by the Contractor or others in connection with the electrical work that result in expenditure of man-hours set out in other parts of the contract scope.
9. Changes in the general scope, extent, or character of the project or its design including, but not limited to, changes in size, complexity, City of Modesto’s schedule, character of construction, or method of financing; and revising previously accepted studies, reports, design documents, or construction contract documents when such revisions are required by changes in laws, rules, regulations, ordinances, codes, or orders enacted subsequent to the preparation of such designs or due to any other causes beyond the Engineer’s control. #7..
- 408 -
EXHIBIT A
10. Peer Review for various Capital Improvement projects Electrical design.
11. Other assignments as requested by City staff.
Sub-consultants may be part of some of the tasks. Services will be completed on a time and materials basis in conformance with the Fee Schedule provided on the following page. #7..
- 409 -
Pezzoni Engineering
1150 9th Street, Suite 1415
Modesto, CA 95354
(209) 554-4602
FEE SCHEDULE FOR PROFESSIONAL SERVICES
EFFECTIVE: January 1, 2024
The following fees are presently in effect for professional services available from our firm:
CONSULTATION SERVICES:
Investigative/Expert Witness/Professional Consultation TBD* ENGINEERING SERVICES:
Principal Engineer $240.00 Per Hour
Project Manager $210.00 Per Hour
Engineer $185.00 Per Hour
Senior Designer $165.00 Per Hour
Designer $132.00 Per Hour
CAD/BIM Specialist $105.00 Per Hour
Clerical $82.00 Per Hour
* Charges for investigative services, expert witness or professional consultation are generally not applicable to projects involving the preparation of plans or specifications for construction projects.
The fees, terms, and conditions stated herein are included and a part of this Agreement by reference. Carrying charges equal to one percent per month, twelve percent A.P.R., may be assessed to all accounts over 60 days of billing.
The Client agrees to limit our liability and to defend and hold harmless for any cause in connection with this project to a maximum of our net aggregate fees as stated in this proposal. The Client and Owner further agree that any cause of action shall be adjudicated in Stanislaus County, California. The prevailing Party to any action shall be entitled to the full recovery of all expenses, fees, hours, and consultants associated with defending such actions, all to be paid by the nonprevailing Party or Parties, based upon a percentage of award of damages or dismissal.
Should actions be taken for the collection of fees due, the prevailing party will be entitled to full recovery of costs of collection paid by the non-prevailing party. This agreement is entered into on the above-referenced date in Stanislaus County, California.
Client may terminate this Agreement with or without cause, upon written notice.
Should any provision of this Agreement be found to be unenforceable by the presiding Court or authority, the entire balance of this agreement shall remain in full force and effect.
EXHIBIT B
#7..
- 410 -
-1-
ON-CALL AGREEMENT FOR ARCHITECTURAL DESIGN SERVICES
THIS AGREEMENT, made and entered into in the City of Modesto, State of California, this day of , 2024, (“Effective Date”) by and between the CITY OF MODESTO, a municipal corporation of the State of California, hereinafter referred to as "City", and RED INC ARCHITECTS, a California Corporation, hereinafter referred to as "Consultant".
This Agreement is made with regard to the following recitals:
A. City has determined that there is a need for On-Call Architectural Design Services.
B. Consultant represents that it is qualified, willing and able to provide the requested On-Call Architectural Design Services.
NOW, THEREFORE, in consideration of this agreement, and the mutual promises, covenants, and stipulations hereinafter contained, the parties agree as follows:
1. SCOPE OF SERVICES.
Services to be provided by Consultant under this agreement shall generally fall under, but are not limited to, one or more of the categories as set forth and described in the documents attached hereto and referred to as Exhibit "A".
Specific scope(s) of services to be provided by Consultant shall be further defined by and authorized by City through the issuance of project-specific Task Orders. Each specific Task Order will require a written, scope outlining the specific services to be provided by Consultant, the schedule for completion, and the proposed compensation amount(s) and payment methodology to perform the specified services. The City must authorize each Task Order in writing prior to commencement of services by the Consultant. #7..
- 411 -
-2-
The Consultant shall perform the services, as described in Exhibit "A" to this Agreement and subsequent Task Orders, in a manner compatible with the standards of its profession, and shall produce a fully complete project that is acceptable to City.
2. TERM OF AGREEMENT.
This Agreement is effective as of the date first written above and will continue in effect until City's acceptance of and payment for all services authorized by City and performed by Consultant, or one (1) year from the above date, whichever occurs latter, with the possibility of two (2) one (1) year extension options, at the sole discretion of City, unless terminated earlier in accordance with the provisions of the termination clause in this Agreement.
City hereby gives Consultant notice to proceed with the provision of services described in Exhibit "A" to this Agreement, as of the Effective Date of this agreement.
Consultant shall diligently proceed with the work and agrees to complete said specific scope(s) of services within the time period set forth in each respective Task Order.
3. COMPENSATION.
Consultant agrees to accept an estimated amount of ONE HUNDRED THOUSAND AND 00/100 DOLLARS ($100,000) per year, and a total amount not to exceed THREE HUNDRED THOUSAND AND 00/100 DOLLARS ($300,000) over three years as of the Effective Date as full remuneration for performing all services and furnishing all staffing and materials called for in Exhibit "A”, and subsequent Task Orders, and for performance by Consultant of all of its duties and obligations under this Agreement.
The Compensation shall be paid pursuant in the manner and at the times set forth below:
#7..
- 412 -
-3-
City shall pay Consultant for work performed as authorized by subsequent Task Orders. All work shall be billed: 1) on a time and materials basis, at the hourly rates set forth in Exhibit “B”, attached hereto, or; 2) on a lump sum, fixed fee basis, as authorized by City per specific Task Order(s). Lump sum fees shall generally be in accordance with approximate amounts as shown in Exhibit “B”. Unless otherwise approved by City, the hourly rates and lump sum fees shown in Exhibit “B” shall remain in effect for the entire term of the agreement, including all extensions.
Consultant shall submit monthly invoices to City which include a detailed description of completed tasks, hours worked, and billable rates or percentage complete (for lump sum tasks) for all work completed, and detailed receipts for any out-of-pocket costs paid by Consultant in connection with work performed on this Project.
4. OBLIGATIONS OF CONSULTANT.
Throughout the term of this Agreement, Consultant shall possess, or secure all licenses, permits, qualifications and approvals legally required to conduct business.
Consultant warrants that it has all of the necessary professional capabilities and experience, as well as all tools, instrumentalities, facilities and other resources necessary to provide the City with the services contemplated by this Agreement. Consultant further warrants that it will follow the best current, generally accepted and professional practices to make findings, render opinions, prepare factual presentations, and provide professional advice and recommendations regarding this project.
5. PERFORMANCE BY KEY EMPLOYEE.
Consultant has represented to City that Barrett Lipomi, AIA will be the person primarily responsible for the performance of the services referred to in this Agreement. #7..
- 413 -
-4-
City has entered into this Agreement in reliance on that representation by Consultant. Consultant therefore agrees that ten percent (10%) or more of the time to be devoted to the project that is the subject of this Agreement will be that of the above-named person.
6. OWNERSHIP OF DOCUMENTS/TITLE TO DATA.
Ownership of Documents
All reports, drawings, designs, graphics, working papers and other incidental work or materials furnished hereunder shall become and remain the property of the City, and may be used by City as it may require without any additional cost to City. No reports shall be used by the Consultant for purposes other than this contract without the express prior written consent of City.
Title to Data
If, as a part of the agreement, Consultant is required to produce data such as, but not limited to, drawings, plans, specifications, calculations, models, flow diagrams, visual aids and other related materials, the originals of all such data generated under this agreement will be delivered to City upon the completion or termination of services under the contract.
All materials, documents, data or information obtained from the City data files or any City medium furnished to Consultant in the performance of this Agreement will at all times remain the property of the City. Such data or information may not be used or copied for direct or indirect use by Consultant after termination of this Agreement without written consent of the City.
7. NEWS AND INFORMATION RELEASE.
Consultant agrees that it will not issue any news releases in connection with either the award of this Agreement, or any subsequent amendment of or efforts under this #7..
- 414 -
-5-
Agreement, without first obtaining review and approval of said news releases from City through the City Manager.
8. INTEREST OF CONTRACTOR.
Consultant warrants that it presently has no interest and shall not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of services required to be performed under this Agreement. Consultant warrants that, in performance of this Agreement, Consultant shall not employ any person having any such interest. Consultant agrees to file a Statement of Economic Interests with the City Clerk at the start and end of this contract if so required at the option of City.
9. AMENDMENTS.
Both parties to this Agreement understand that it may become desirable or necessary during the execution of this Agreement, for City or Consultant to modify the scope of services provided for under this Agreement. Any material extension or change in the scope of work shall be discussed with City and the change and cost shall be memorialized in a written amendment to the original contract prior to the performance of the additional work.
Until a change order is so executed, City will not be responsible to pay any charges Consultant may incur in performing such additional services, and Consultant shall not be required to perform any such additional services.
10. INDEPENDENT CONTRACTOR.
All acts of Consultant, its agents, officers, and employees and all others acting on behalf of Consultant relating to the performance of this Agreement, shall be performed as independent contractors and not as agents, officers, or employees of City. Consultant, by virtue of this Agreement, has no authority to bind or incur any obligation on behalf of City. #7..
- 415 -
-6-
Consultant has no authority or responsibility to exercise any rights or power vested in the City.
No agent, officer, or employee of the City is to be considered an employee of Consultant. It is understood by both Consultant and City that this Agreement shall not under any circumstances be construed or considered to create an employer-employee relationship or a joint venture.
Consultant, its agents, officers and employees are and, at all times during the terms of this Agreement, shall represent and conduct themselves as independent contractors and not as employees of City.
Consultant shall determine the method, details and means of performing the work and services to be provided by Consultant under this Agreement. Consultant shall be responsible to City only for the requirements and results specified in this Agreement, and, except as expressly provided in this Agreement, shall not be subjected to City's control with respect to the physical action or activities of the Consultant in fulfillment of this Agreement. Consultant has control over the manner and means of performing the services under this Agreement.
Consultant is permitted to provide services to others during the same period service is provided to City under this Agreement. If necessary, Consultant has the responsibility for employing other persons or firms to assist Consultant in fulfilling the terms and obligations under this Agreement.
If in the performance of this Agreement any third persons are employed by Consultant, such persons shall be entirely and exclusively under the direction, supervision, and control of Consultant. All terms of employment including hours, wages, working conditions, discipline, hiring, and discharging or any other term of employment or requirement of law shall be determined by the Consultant.
#7..
- 416 -
-7-
It is understood and agreed that as an independent contractor and not an employee of City neither the Consultant or Consultant's assigned personnel shall have any entitlement as a City employee, right to act on behalf of the City in any capacity whatsoever as an agent, or to bind the City to any obligation whatsoever.
It is further understood and agreed that Consultant must issue W-2 forms or other forms as required by law for income and employment tax purposes for all of Consultant's personnel.
As an independent contractor, Consultant hereby indemnifies and holds City harmless from any and all claims that may be made against City based upon any contention by any third party that an employer-employee relationship exists by reason of this Agreement.
11. ASSIGNMENT.
Neither this Agreement nor any portion thereof shall be subcontracted or assigned without the express prior written consent of the City in each and every instance.
12. PATENT/COPYRIGHT MATERIALS.
Unless otherwise expressly provided in the contract, Consultant shall be solely responsible for obtaining the right to use any patented or copyrighted materials in the performance of this Agreement. Consultant shall furnish a warranty of such right to use to City at the request of City.
13. NOTICES.
Notice required by this Agreement shall be given in writing and shall be deemed given and effective upon receipt provided that such are delivered in accordance with the provisions of this Section. Notices shall be delivered either by: (a) personal delivery (including delivery by an overnight courier service which obtains confirmation of receipt); or (b) by #7..
- 417 -
-8-
facsimile, provided that such transmission is followed by delivery by an overnight courier service which obtains confirmation of receipt; or (c) postage prepaid, return receipt requested, certified mail; or (d) by electronic transmission subject to reasonable proof that the notice was both transmitted and received. Each such notice shall be sent to the parties at the address respectively set forth below or to such other address as a party may designate by written notice given in accordance with the provisions of this Section:
FOR CONSULTANT: Name: Red Inc Architects
Address: 1217 J Street
Modesto, CA 95354
Attention: Barrett Lipomi
Phone: (209) 522-8900
Email: [email protected]
FOR CITY: Name: City of Modesto
Address: 1010 10th Street, Suite 4600
Modesto, CA 95354
Attention: Edgar Vargas
Phone: (209) 577-5424
Email: [email protected]
14. INSURANCE REQUIREMENTS.
The Consultant shall provide at its own expense and maintain at all times the following insurance with insurance companies licensed in the State of California and shall provide evidence of such insurance to the City as may be required by the Risk Manager of the City. The policies or certificates thereof shall provide that, thirty (30) days prior to cancellation or material change in the policy, notices of same shall be given to the Risk Manager of the City by certified mail, return receipt requested, for all of the following stated insurance policies.
In the event the certificates of insurance required hereunder do not provide for notice of cancellation to the certificate holder and/or additional insureds, the Consultant shall #7..
- 418 -
-9-
provide, and shall require its subcontractors to provide, as an express condition precedent to payment hereunder, an endorsement from their insurers providing that the additional insureds identified herein shall be provided 30 days notice of the cancellation on the policies of insurance required hereunder (10 days notice if the policies are cancelled for non-payment of premium). In addition, the named insured on all such policies shall provide to the additional insureds identified herein any notices of cancellation of said insurance policies within 5 business days of receipt of such notice. The Consultant shall, as a further express condition precedent to payment for work performed, affirm under penalty of perjury that the required insurance on the project remains in place and said insurance has not been cancelled.
(a) Worker's Compensation in compliance with the statutes of the State of California, plus employer's liability with a minimum limit of liability of $1,000,000. (b) General Liability insurance with a minimum limit of liability per occurrence of $1,000,000 for bodily injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. This insurance shall indicate on the certificate of insurance the following coverages and indicate the policy aggregate limit applying to: premises and operations; broad form contractual; independent consultants and subcontractors; products and completed operations as applicable.
(c) Automobile Liability insurance with a minimum limit of liability per occurrence of $1,000,000 for bodily injury and property damage. This insurance shall cover any automobile for bodily injury and property damage.
#7..
- 419 -
-10-
(d) Professional Liability insurance with a minimum limit of $1,000,000 per claim and policy aggregate. If coverage is on a claims made basis it shall be maintained for at least three (3) years following completion of the work.
If at any time any of said policies shall be unsatisfactory to the City, as to form or substance, or if a company issuing such policy shall be unsatisfactory to the City, the Consultant shall promptly obtain a new policy, submit the same to the Risk Manager for approval and submit a certificate thereof as hereinabove provided. Upon failure of the Consultant to furnish, deliver or maintain such insurance and certificates as above provided, this Agreement, at the election of the City, may be forthwith declared suspended or terminated.
Failure of the Consultant to obtain and/or maintain any required insurance shall not relieve the Consultant from any liability under this Agreement, nor shall the insurance requirements be construed to conflict with or otherwise limit the obligations of the Consultant concerning indemnification. The City, its agents, officers, employees, and volunteers shall be named as an additional insured on all insurance policies required herein, except Workers' Compensation and Professional Liability. The Workers' Compensation insurer shall agree to waive all rights of subrogation against the City, its agents, officers, employees, and volunteers for losses arising from work performed by Consultant for the City. The Consultant's insurance policy(ies) shall include a provision that the coverage is primary as respects the City; shall include no special limitations to coverage provided to additional insured; and, shall be placed with insurer(s) with acceptable Best's rating of A:VII or with approval of the Risk Manager. The Consultant must deliver certificates evidencing existence of the insurance listed above to the City prior to the time the contract is signed.
#7..
- 420 -
-11-
CONSULTANT shall provide CITY with separate endorsements evidencing proof of the CITY’s additional insured status as to both the general liability and automobile liability insurance policies. In addition, CONSULTANT shall provide CITY with a Workers Compensation subrogation waiver by way of a separate endorsement. All endorsements referenced above must include the applicable policy number.
For any claims related to this project, the CONSULTANT’S insurance coverage shall be primary insurance as respects the Entity, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the Entity, its officers, officials, employees, or volunteers shall be excess of the CONSULTANT’S insurance and shall not contribute with it.
15. TERMINATION OF AGREEMENT.
Termination by City for Default of Consultant
Should Consultant default in the performance of this Agreement or materially breach any of its provisions, at its option, City may terminate this Agreement by giving written notification to Consultant. The termination date shall be the effective date of the notice. For the purposes of this section, material breach of this Agreement shall include, but not be limited to, any of the following: failure to perform required services or duties, willful destruction of City's property by Consultant, dishonesty or theft.
Termination by City for Convenience
The City may also terminate the Consultant's performance under the Agreement, either in whole or in part, at its own discretion, or when conditions encountered during the Work make it impossible or impracticable to proceed, or when the City is prevented from proceeding with the Agreement by act of God, by law, or by official action of a public authority, or upon a #7..
- 421 -
-12-
determination by the City that such termination is in the best interest and convenience of the City, or whenever the City is prohibited from completing the Work for any reason. The City shall provide no less than ten (10) calendar days written notice of its intent to terminate the Agreement for convenience, and shall endeavor to provide the Consultant with consultation with the City prior to termination.
Post-Termination Procedure
Upon receipt of a written notice of termination pursuant to either of the foregoing paragraphs, the Consultant shall:
a. Cease its work as directed in the notice of termination as of the termination date and see to it that its employees, subconsultants and agents are notified of such termination and act as specified in the notice of termination;
b. Terminate all orders and Subcontractors except as necessary to complete any portion of the Work that is not terminated; c. If directed in writing by the City to do so, assign all right, title and interest in subcontracts and materials in progress to City, in which case the City will have the right at its discretion to settle, or pay any or all claims arising out of the termination of such subconsultants, but in no event shall recovery by any Consultant or subconsultant include lost profits for portions of the Work not completed or undertaken, including materials not delivered; d. Deliver or otherwise make available to the City all data, drawings, specifications, reports, estimates, summaries and such #7..
- 422 -
-13-
other information and material as may have been accumulated by the Consultant in performing the Work whether completed or in process; e. Settle outstanding liabilities and claims, subject to the approval of City;
f. Complete performance of such part of the Work as has not been terminated;
g. Take such other actions as may be necessary, or as may be directed by the City for the protection and preservation of the Work and/or property related to the Work;
h. If City so requests, and at City's cost, Consultant shall provide sufficient oral or written status reports to make City reasonably aware of the status of Consultant's work on the project. i. The Consultant understands and agrees that City may, in City's sole discretion, refuse to pay Consultant for that portion of Consultant's services which were performed by Consultant on the project prior to the termination date and which remain
unacceptable and/or not useful to City as of the termination date.
City will pay Consultant an amount based on the percentage of satisfactory work completed in accordance with the notice of termination. The final payment to the Consultant after termination for convenience shall be limited to amounts due and owing under the Agreement at time of termination, including the following:
a. The cost of settling and paying valid claims arising out of the termination of the Work such as subconsultant agreements or #7..
- 423 -
-14-
contracts for materials;
b. The Agreement price allocable to the portion of the Work properly performed or goods supplied to the work site by the Consultant as of the date of termination, as determined in accordance with the notice of termination, reduced by any sums previously paid to the Consultant.
Authorization to Terminate Agreement
Termination of the Agreement may be invoked by the City Manager, or his/her designee, subject to the right of the Consultant to appeal the City Manager, or his/her designee’s, decision to the City Council. The Consultant shall appeal by notifying the City Clerk in writing within ten (10) calendar days of receipt of written notification from City of termination of the Agreement. In the event that termination of this Agreement is upheld by the City Council, any cessation of payment of delay claims, extended claims, Eichleay claims, or any other claims for delay shall be retroactive to the date of termination selected by the City Manager, or his/her designee.
16. CERTIFIED PAYROLL REQUIREMENT.
For consultants performing field work on public works contracts on which prevailing wages are required: The Consultant shall comply with the provisions of Section 1776 of the California Labor Code, regarding payroll records, and shall require its subconsultants and subcontractors to comply with that section as may be required by law.
17. INDEMNITY.
The Consultant shall hold the City, its agents, officers, employees, and volunteers, harmless from and save, defend and indemnify them against any and all claims, #7..
- 424 -
-15-
losses, liabilities, judgments or damages from every cause, including but not limited to injury to person or property or wrongful death, including reasonable costs and expenses of defense of any judicial or administrative action, arising directly or indirectly out of any negligent or intentional act or omission of Consultant, or its agents, officers, employees, or volunteers relating to or during the performance of its obligations under this Agreement.
Consultant's obligation to defend, indemnify, and hold the City, its agents, officers, and employees harmless under the provisions of this paragraph is not limited to or restricted by any requirement in this Agreement for Consultant to procure and maintain a policy of insurance.
18. DISPUTE RESOLUTION.
All claims, controversies, or disputes arising out of, or relating to the formation of this Agreement, or the breach, termination execution, enforcement, interpretation, or validity of this Agreement, including the determination of the scope or applicability of this contract provision shall be determined by binding arbitration in Modesto, California by one arbitrator, except as otherwise specified in this Agreement. The American Arbitration Association shall administer the arbitration under its Arbitration Rules then in effect, subject to the modifications of those rules contained in this paragraph. This agreement to arbitrate shall be specifically enforceable under the prevailing law of any court having jurisdiction, and the award rendered by the arbitrator may be entered in any court having jurisdiction. The appropriate venue for any arbitration or court proceeding relating to or arising out of this provision shall be in Stanislaus County, California.
This paragraph is not intended to and does not waive the claim filing requirements found in California Government Code section 900 et seq. In the event that a timely #7..
- 425 -
-16-
and legally sufficient, arbitrable claim is filed by Consultant with City, and the claim is rejected in whole or in part by City, this paragraph shall result in the conclusive, final, and binding resolution of all the issues presented in the claim by Consultant so long as any issues presented by the claim are arbitrable. Claims rejected by City or by operation of law, shall be submitted by Consultant to arbitration pursuant to the Arbitration Rules of the American Arbitration Association within ninety (90) days after mailing of the written rejection by City to Consultant.
Otherwise, the claim or claims shall be deemed waived in their entirety.
The “fast track’ rules of the American Arbitration Association shall apply to any claim or counterclaim less than ONE HUNDRED FIFTY THOUSAND AND 00/100 ($150,000.00) DOLLARS. In arbitration not proceeding under the “fast track” rules, the arbitrator shall have the power to order that depositions be taken and other discovery be made.
Both City and Consultant shall have the right, upon written notice, to take no more than three (3) depositions of the other as a matter of right in an arbitration proceeding under the “fast track” rules.
Whether or not City and Consultant may be engaged in interstate commerce, any controversy or dispute mentioned above shall be determined by, and the parties shall be bound by, the substantive law of the State of California, and not the Federal Arbitration Act at 9 USC Section 1 et seq.
The arbitrator may grant any remedy or relief deemed by the arbitrator just and equitable under the circumstances, whether or not such relief could be awarded in a court of law. The arbitrator shall be empowered to award monetary sanctions against a party for failure of cooperation in the arbitration. The arbitrator shall, in written award, allocate all the costs of the arbitration, including the fees of the arbitrator and the reasonable attorney fees of the #7..
- 426 -
-17-
prevailing party, against the party who did not prevail. The prevailing party shall be the party in whose favor the majority of the central issues in the case are resolved.
Notwithstanding anything in this provision to the contrary, the arbitrator shall have no power to award punitive damages or other damages not measured by the party’s actual damages (excluding litigation costs and fees) against any party. This limitation of the arbitrator’s powers under this Agreement shall not operate as an exclusion of the issue of punitive damages from this Agreement to Arbitrate sufficient to vest jurisdiction in a court with respect to that issue.
Consultant shall include in all subcontracts a specification whereby the subcontractor consents to being joined in arbitration between City and Consultant involving the work of the subcontractor to be joined. Consultant’s failure to do so shall be a breach of this Agreement.
The parties hereby waive any rights provided by Title 9.2 of the California Code of Civil Procedure, Section 1296. The arbitrator’s award shall be deemed final, conclusive and binding to the fullest extent allowed by California law.
19. ENTIRE AGREEMENT.
This Agreement and its exhibits contain the entire understanding between Consultant and City. Additional or new terms contained in this Agreement which vary from Consultant's proposal are controlling and are deemed accepted by Consultant by shipment of any article or other commencement of performance hereunder. All previous proposals, offers and communications relative to this Agreement, whether oral or written, are hereby superseded except to the extent that they have been incorporated into this Agreement. No future waiver of #7..
- 427 -
-18-
or exception to any of the terms, conditions, and provisions of this Agreement shall be considered valid unless specifically agreed to in writing by all the parties.
20. PARTIAL INVALIDITY.
If any provision in this Agreement is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions shall nevertheless continue in full force without being impaired or invalidated in any way.
21. WAIVER.
The waiver by any party to this Agreement of a breach of any provision hereof shall be in writing and shall not operate or be construed as a waiver of any other or subsequent breach hereof unless specifically stated in writing.
22. AUDIT.
The City's duly authorized representative shall have access at all reasonable times to all reports, contract records, contract documents, contract files, and personnel necessary to audit and verify Consultant's charges to City under this Agreement.
Consultant agrees to retain reports, records, documents, and files related to charges under this Agreement for a period of four (4) years following the date of final payment for Consultant services. City's representative shall have the right to reproduce any of the aforesaid documents.
23. GOVERNING LAW.
This Agreement shall be governed according to the laws of the State of California.
#7..
- 428 -
-19-
24. HEADINGS NOT CONTROLLING.
Headings used in the Agreement are for reference purposes only and shall not be considered in construing this Agreement.
25. COMPLIANCE WITH LAWS.
Consultant shall insure compliance with all safety and hourly requirements for employees, in accordance with federal, state, and county safety and health regulations and laws. Consultant shall fully comply with all applicable federal, state, and local laws, ordinances, regulations and permits.
26. CITY BUSINESS LICENSE.
Consultant will have a City of Modesto business license.
IN WITNESS WHEREOF, the City of Modesto, a municipal corporation, has authorized the execution of this Agreement by its City Manager and attestation by its City Clerk under authority of Resolution No. 2024- , adopted by the Council of the City of Modesto on the day of , 2024, and RED INC ARCHITECTS has caused this agreement to be duly executed as of the Effective Date.
#7..
- 429 -
1217 J. Street Modesto, CA 95354 209.522.8900 redincarchitects.com
SCOPE OF SERVICES
Our team follows a detailed technical approach to provide services to our Clients. This design approach starts with a detailed work plan that outlines each step and milestone throughout the duration of the project.
The first step in our design approach is the development of a Work Plan. This work plan outlines the key phases of the project, from initial planning through completion of construction. The development of the work plan is done collectively, working with you, as well as the full A/E Team. During this step of the design process, key issues, goals, objectives, and critical success factors are identified for the project for each phase of the project delivery process.
Our Scope of Services include the following:
• Schematic Design
• Design Development
• Construction Documents
• Bidding
• Construction Administration
SCHEMATIC DESIGN
The Design portion of the project consists of three phases, each phase corresponding to a submittal to our Client for review and approval. The objective of the Schematic Design Phase is the translation of the program and site development plan into a building design, as well as meeting the goals, operational objectives and budget requirements established.
Our Team then prepares all necessary Schematic Design Documents including, but not limited to, the following:
• Site Plan based on site information from the Client, indicating the location of the buildings, major improvements, such as proposed parking areas, and location of exterior utilities and service lines.
• Floor Plans showing all rooms and areas, entrances, exits, circulation corridors, as well as major mechanical and electrical areas.
• Building Elevations showing the various building masses and how they coincide with the floor plans, including proposed materials.
• Building Sections showing floor-to-deck dimensions sufficiently indicating interface with structures.
• Preliminary general descriptions of systems, the general type and scope of construction, and the equipment required therein.
EXHIBIT A
#7..
- 430 -
1217 J. Street Modesto, CA 95354 209.522.8900 redincarchitects.com Schematic Design Drawings are reviewed by a team member. During that review they will verify constructability and coordination between disciplines.
Once this review of the package is complete, it is submitted to the client for review and approval prior to executing the following phases.
DESIGN DEVELOPMENT
A well-developed schematic design that has the full support of all major stakeholders is the foundation of the work in the Design Development phase. Design Development of the approved schematic design documents will include identification, selection and sizing of all major building systems and components. The process is again achieved by a collaborative effort from all members of the project team.
Design Development documents are reviewed for constructability and coordination between all disciplines. Once the package is complete, it is then submitted to the Client for review and approval prior to the next phase.
CONSTRUCTION DOCUMENTS
The Construction Documents phase of the project builds on the decisions made during the Design Development phase. A coordinated set of drawings and specifications is then prepared and submitted to all approving agencies. These drawings will include all design and engineering disciplines, as well as any reports, applications and/or additional forms.
This is also the phase in which any, and all requested revisions will be addressed.
CONSTRUCTION ADMINISTRATION
Our experience has proven that having key project personnel that are involved during the design and construction documents phases provide construction support and ensures consistency.
Maintaining this continuity is what solidifies that design and performance goals are achieved.
During the Construction Administration phase, the A/E Team will assist in the following:
• Respond to all RFI’s, memorandums, and all other inquiries from the field. • Prepare designs bulletins for any changes needed.
• Review and approve all submittals, shop drawings and substitution requests. • Attend on-site construction and team meetings.
• Review and comment on all requests for revisions or changes. • Provide final closeout services and documentation.
EXHIBIT A
#7..
- 431 -
1217 J Street Modesto CA 95354 209.522.8900 redincarchitects.com
HOURLY FEE SCHEDULE
The following fees are presently in effect for professional services available from our firm:
ARCHITECTURAL SERVICES
Principal Architect $195.00 Per Hour
Senior Project Manager $145.00 Per Hour
Project Manager $130.00 Per Hour
Job Captain $115.00 Per Hour
Project Designer $105.00 Per Hour
Project Draftsman $95.00 Per Hour
Project Administrator $85.00 Per Hour
OTHER
Reimbursables Direct Cost + 10%
Auto Travel IRS Rate at Time of Service
EXHIBIT B
#7..
- 432 -
#7..
- 433 -
#7..
- 434 -
CITY OF MODESTO
COMMITTEE AGENDA REPORT
DATE OF MEETING:
May 20, 2024
Date: April 30, 2024
TO: Finance Committee
Nick Bavaro, Chair
Rosa Escutia-Braaton, Vice-Chair
David Wright, Member
THROUGH: Joseph P. Lopez, City Manager
FROM: William Wong, Director of Utilities
SUBJECT: Engineering Services Agreements with Carollo Engineers Downtown Sewer Trunk Rehabilitation
Santa Rosa Sewer Trunk Rehabilitation
CONTACT: Cristian Ciotau, Engineering Division Manager
[email protected], 209-577-5260
DESCRIPTION:
Consider two Engineering Services Agreements with Carollo Engineers, of Walnut Creek, CA, for the Downtown Sewer Trunk Rehabilitation and the Santa Rosa Sewer Trunk Rehabilitation Projects, in the amount of $935,326, plus $93,534 in additional services, if needed, for a combined amount not to exceed $1,028,860 and forwarding to Council for approval. (Funding Source: Wastewater Fund)
STRATEGIC PLAN ELEMENT:
The recommended action supports the 2020-2025 City of Modesto Strategic Plan Initiatives, Goal D: Provide safe, efficient, and reliable infrastructure through proactive community investment, maintenance, and sustainability efforts.
BACKGROUND:
The 2016 Wastewater Collection System Condition Assessment Report prepared by Brown and Caldwell provided Utilities Department staff with an understanding of current pipeline and manhole conditions in the collection system by inspecting and assessing a representative number of unlined reinforced concrete pipe reaches and manholes. The report documented procedures and findings of the investigation and provided recommendations for the repair and rehabilitation of the pipeline and manhole assets.
The following areas have been identified as being moderately to severely deteriorated:
#8..
- 435 -
Finance Committee, May 20, 2024
Engineering Services Agreements with Carollo Engineers
Downtown Sewer Trunk Rehabilitation
Santa Rosa Sewer Trunk Rehabilitation