Page 26 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Clarifications & Assumptions

6 OF 10 CLARIFICATIONS, ASSUMPTIONS AND ALLOWANCES

93. All window films and tinting to be installed by Topgolf.

94. We have included Assa Abloy Automatic door operators as there is no specification for this scope of work.

95. We have included painting of the smoke door housings to match the adjacent walls.

96. All keying to be Topgolf responsibility per Note 10 on sheet A9.2.

Division 9

97. Soap dispensers etc. that may be required for the kitchen scope of work is part of the kitchen equipment package by Topgolf.

98. Soap dispensers etc. that may be required for the bar scope of work is part of the bar equipment package by Topgolf.

99. We have included California Compliant Paint products, conforming to the California state requirements regarding VOC products and have excluded any notes or comments requiring such.
100. We have assumed intumescent paint will not be required at the safety net reduced beam (ref. A6.5). EM1.2a does not indicate intumescent paint at these members.
101. Intumescent paint at exterior stairs has been included. 102. We have included intumescent paint per EM1.2a.
103. Furnish and install artificial turf is by Topgolf. 104. We have included polished concrete per RFI Response #50. 105. We have included FRP at locations as shown and will not be installed behind headers, coolers or at cook lines.

Division 10

106. We have included fencing at the Outfield entries that attaches to, and derives support from, the outfield poles and the building.
107. Exterior building Topgolf Logo Signage and “TOPGOLF” is Topgolf Furnished Topgolf installed per RS1.1.
108. We have included signage as indicated on the drawings and coordinated with Owner Furnished Owner Installed signage per the RS1.1 document. We have included minimum code required signage per details on EM1.0 as they apply to locations throughout the building. Standard building code signage not shown, has been assumed and included.
109. We have included an allowance for Seismic Bracing of the Folding Panel Partition as no details were provided. Seismic bracing is required per California code.

Division 11

N/A

Page 105 of 259 ends
Page 27 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Clarifications & Assumptions

7 OF 10 CLARIFICATIONS, ASSUMPTIONS AND ALLOWANCES Division 12

N/A

Division 13

N/A

Division 14

110. Monospace Kone elevator is included. Ecospace elevator is discontinued. 111. We have provided Elevator A with a capacity of 3500 lb to meet local code requirements. Documents indicate 2500 lb.
112. We have provided each elevator with an emergency phone battery device, overtime callbacks during warranty maintenance, wireless phone option, and two hour guaranteed response times.

Division 21

113. We have excluded insulation of fire protection piping. This is noted in the specifications but not required in this region.
114. Fire protection includes (1) double interlock pre -action system serving computer room 016.

Division 22

115. Filters for kitchen equipment are provided and installed by Topgolf. 116. We have included sleeves only for beverage tubing and plumbing scope excludes all beverage tubing furnish and install (Ref. K-4.0L, M, U). 117. We have included a 3” natural gas connection on the building side of the utility meter. Furnish and install of Natural gas service to building and utility meter are excluded. Natural gas system within the building is sized and routed per the plumbing drawings.
118. We have included furnish and install of fixtures and faucets per the “P” drawings only and utility connections only for kitchen fixtures and faucets. We have excluded furnish and install for all kitchen sinks and associated faucets and trim identified on the “K” drawings, these are by Topgolf. 119. Trap primers are included at floor drains in lieu of Trap Guards. 120. Above grade storm & overflow drain and waste & vent piping is PVC material.

Division 23

ϭϮϭ͘ We have included fire dampers and combination fire/smoke dampers per the mechanical documents.

Page 106 of 259 ends
Page 28 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Clarifications & Assumptions

8 OF 10 CLARIFICATIONS, ASSUMPTIONS AND ALLOWANCES ϭϮϮ͘ We have included furnish and install of (4) kitchen hoods, perforated supply plenums, and options as scheduled on drawing M5.1 and associated fire extinguishing system per drawing M5.6. 
ϭϮϯ͘ We have included furnish and install of (2) kitchen exhaust fans and (1) makeup air unit per drawing M5.8.
ϭϮϰ͘ All HVAC equipment is independently controlled by local thermostats. There is no central BMS system. 
125. We have included installation only of the Topgolf Furnished hitting bay infrared gas heaters (102 each), Carrier pack age rooftop units (9 each), Air Curtains (2 each). We exclude purchase, delivery to site and equipment manufacturer warranties for this equipment. We include 12 month labor warranty only for this equipment.
126. We have included roof penetrations only for conde nsing unit refrigeration piping.

Division 26

127. The Primary c onduit duct bank from the SCE utility point of connection is included to the edge of the property line. We have not included any work on Via Campo.
128. SCE utility drawings have not been received or reviewed and are not included in the estimate. Primary and secondary conduit duct banks are included as described above and per the site electrical drawings.
129. MC Cable will be used in concealed spaces.
130. The electrical distribution equipment is required to be purchased from PCX per the project documents. The specifications indicate that electrical distribution equipment shall be provided with copper busing . However, the bill of material from PCX reflects equipment that includes a combination of aluminum and copper bussing. By purchasing equipment from PCX, t he electrical distribution equipment will be provided as it is received from PCX with both aluminum and copper and will not comply with the specification. 131. Electrical distribution equipment and conduit infrastructure only are included for the EV charging Stations. Concrete equipment Pads, power conductors, and installation of EV charging stations are excluded and to be provided by Topgolf.
132. Lightening protection systems are not included in the estimate. 133. EMT conduit in l ieu of GRC is included at the Hitting Ba ys because the Hitting Bays are believed to be classified as indoor spaces.
134. A Two-Way communication system is included with 2-hour fire rated cable per 2019 CBC, T24, Part 2, Section 1009.8.
135. The approved switchgear manufacturers listed in the specifications are unable to provide switchgear in alignment with the project schedule. Eaton Switchgear is the only manufacturer that has indicated they can provide switchgear within a timely manner to comply with the schedule and is included in the estimate. It is anticipated that Eaton switchgear will be a n

Page 107 of 259 ends
Page 29 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Clarifications & Assumptions

9 OF 10 CLARIFICATIONS, ASSUMPTIONS AND ALLOWANCES approved manufacture upon coordination with the EOR because Eaton was successfully used and installed at the El Segundo Topgolf Facility. 136. A temporary power allowance is included with the assumption of tapping into the nearby overhead residential 120/240V, single phase power poles at the start of construction. If the residential power poles are not available for temporary power use at the start of construction, it may be necessary to use a generator for temporary power. The cost of a generator, fuel, and a permit to operate a generator are not included in the estimate.

Division 31

137. Our earthwork costs are based on rotovating existing sod and relocating it to the appropriate location according to Sheet 1 of the Earthwork – Clubhouse Rough Grading drawing.
138. Earthwork scope of work is based on the recommendations and assumptions presented in the soils report prepared by Leighton Consulting, Inc. dated March 29, 2022.
139. The onsite patch of dirt shown on Sheet 4 of the Rough Grading Plans will be utilized to import dirt onto the jobsite.
140. A vertical layer of ¾ crushed rock, 1 foot in th ickness adjacent to the target exterior metal wall is included. This rock layer will be separated from the onsite soil by filter fabric Mirafi 140N.

Division 32

141. We have included aluminum fence specified in detail 9 on page SP1.2. The steel fence described in keynote 17 on page SP1.1 is excluded. 142. The fence shown on page SP1.1 (connected to gates with keynotes 17 & 18) only extends to the netting from the building.
143. Class II Base (CMB) in lieu of CAB is included for the entirety of the AC Paving work.
144. Documents do not indicate Sidewalk or site concrete color or finish, we have assumed grey broom finished concrete at vehicular concrete and topcast at pedestrian concrete.
145. All turf noted with symbol 4-04 and shown on page L2.1 is assumed to be Furnished and installed by Topgolf, including any requirements for the aggregate base, laser grading, and drainage.
146. Turf shown on page SP1.2 is by Topgolf. The concrete below is included in this proposal.
147. Turf shown on page SH-5 is by Topgolf. The asphalt below per keynote 3 is included in this proposal.
148. Boulders per L2.0 are included in the following quantities (in parathesis) & sizes:
(8) 4'x4, (5) 5'x5', (2) 6'x6'.
149. There is a discrepancy between the landscape plans dated 5/18/21 and the shrub and tree schedule on L2.0 & L2.2. We have only included the trees,

Page 108 of 259 ends
Page 30 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Clarifications & Assumptions

10 OF 10 CLARIFICATIONS, ASSUMPTIONS AND ALLOWANCES shrubs and ground cover ba sed on what is shown on the plans per L2.0 & L2.1.
150. Landscape Sheets L2.1 dated 5/18/21 indicate parking over detention basin .

Per coordination with other documents, we understand that this area will be landscaped. We have provided an allowance for landscape and irrigation for this area.
151. Irrigation controller detail 1/Sheet L-3.0 shows a 3" conduit and sweep for the 2- wire, however the full run of conduit is not clearly depicted. The 2 -wire is assumed to be direct burial passed the point of the PVC conduit shown. 152. We have included the ripping and grading of all planted areas.  The only amendments and fertilizers included will be for the plant pit backfill as there is no specification requirement for all planted areas.
153. We have assumed the recommend ations of the soils report prepared by Leighton Consulting, Inc. dated March 29, 2022 are sufficient and we have excluded the cost of soil tests for soil management.

Division 33

154. All natural gas and water connections to existing utility lines , piping from connection points to new utility meters and utility meters will be furnished , installed and paid for by Topgolf / City of Montebello . All piping from the building side of the meter will be by McCarthy.
155. The new fire water points of connection to public utility main are at the “T” in the main line per SH-21. The 8” PVC public water main is excluded. 156. All utilities running through Topgolf Way within our limit of work line are furnished and installed by Others.
157. The point of connection for line “E1” leading to Top golf Way is assumed to be manhole 51C. Manhole is furnished and installed by Others. 158. Artificial turf areas are sloped to Top golf Way, additional drainage not indicated on the documents for these areas has not been included in the GMP.
159. The CMP detention structure will be installed before Topgolf Way is constructed and net poles are installed.
160. We assume the installation of utility services to the site by the appropriate agencies will be completed in a timely fashion so as not to impact our schedule or final occupancy.

Page 109 of 259 ends
Page 31 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Clarifications & Assumptions
RFI # Phase Trade / Work
Category Location Specification
Section
Sheet /
Drawing
Detail /
Page Date Created Question
Date
Submitted
(Design)
Response Date
Responded
Answer
Issued In
Add. No.
1 Pre-Bid Landscape &
Irrigation Site Not Provided Not
Provided 9/20/2022 Landscape and Irrigation Drawings could not be iden tified in the documents provided. Please provide if to be included in our scope of work. 9/22/2022 Landscape drawings titled "Landscape Development Pl an" dated

05.18.21 included in this addenda. Note - current landscape drawings do not reflect the most current site plan and are anticipated to be updated post bid. (Landscape dra wings show parking over basin and do not have a driveway to s hared parking - please assume similar groundcover to adjacent)
10/4/2022 3
2 Pre-Bid Venue Mini Golf Site Not Provided 5 of 31 6 9/20 /2022 Civil sheet 5 of 31 note 6 indicates to construct m ini-golf course per separate plans. Please provide plans if to be included in o ur scope of work. 9/22/2022 3 Pre-Bid Operable
Partition Building N/A A9.2 9/21/2022
The operable partition noted as door 215C is called out on the finish schedule to be Modernfold. However the door schedule A9.2 ca lls for Moderco. Since all of the other Top Golf locations use Modernfold, is this a typo since the names sound similar? Please advise.
9/22/2022 Modernfold is an acceptable alternate, but Moderco Signature Series 842 is the first choice. Drawing will be updated in next issuance 10/7/2022 5 4 Pre-Bid Structural
Concrete Building Not Provided
S3.0
Typical
Concrete
Detail
8 9/22/2022 Please provide a Footing Size for F11x11A as it is not shown on the Spread Footing Schedule. 9/22/2022 At F11x11A, provide 11'x11'x2'-6" thick footing. R einforce with (11) #8 bottom and 11#5 top. 10/11/2022 NOT ISSUED
5 Pre-Bid Structural
Concrete Building Not Provided
S3.2 -

TYPICAL

TIE BEAM
14 & 16 9/22/2022
Please confirm this detail is correct. It shows a 1 2" thickened slab, a 3'4" Tall Tie Beam and a 3'6" Tall Footing. This conflicts with the Spread Footing Schedule and the Top of Footing called out on S1.1 & S1.2. 9/22/2022
Details are not intended to be scaled. The tie bea ms are 4'-0" deep as indicated on detail 1/S3.2, 3/S3.2 and 1/S3.3. Footing thicknesses and top of footing elevations are as indicated on 8 /S3.0 and foundation plans respectively
10/11/2022 NOT ISSUED
6 Pre-Bid Structural
Concrete Building Not Provided S1.2B &
A12.2B 9/22/2022 Please Confirm there is to be a depressed slab beneath the Freezer and the Cooler in the locations shown on A12.2B 9/22/2022
7 Pre-Bid Plumbing Building N/A P6.3 9/22/2022 Confirm 5 PSI natural gas design as indicated on dr awing P6.3 (Medium Pressure System) 9/22/2022 Confirmed 10/10/2022 NOT ISSUED 8 Pre-Bid Elevators Building 14 21 00 A1.2b,
A1.3b 9/22/2022
Specification section 14 21 00 - 1.02 states that e ach elevator will have 1 front opening at each level and no back openings. P ages A1.2b and A1.3b show Elevator B having a front and back opening for the middle and upper levels. Please confirm the drawings are to be followed. 9/22/2022 Correct, drawings are shown correctly. We will upda te specs for IFC set 10/6/2022 4
9 Pre-Bid Site Utilities Site N/A P3.1A 9/22/2022 P3.1A note 1 indicates gas meter location. Civil d rawings to not indicate point of connection of gas service to the building. Please provide. 9/22/2022 See dry utility composite 10/4/2022 3 10 Pre-Bid Electrical Site N/A E1.1 9/22/2022 Please confirm Electrical primary conduit point of connection location to Service Provider. 9/22/2022 See dry utility composite 10/4/2022 3 11 Pre-Bid Electrical Site N/A E1.1 9/22/2022 Please confirm Telephone /Data primary conduit poi nt of connection location to Service Provider. 9/22/2022 See dry utility composite 10/4/2022 3 12 Pre-Bid Site Utilities Site N/A SH-21 Note 72 &
96 9/22/2022
Sheet 21 of 31 indicates 8" PVC Sewer and PVC Water Separate Plans please confirm if this is to be included in our scope of w ork, if so please provide clarification.
9/22/2022 At this time sewer coming across frontage to manhol e is city scope.

GC to install from manhole to building. 10/4/2022 3
13 Pre-Bid Site Utilities Site N/A SH-21 9/22/2022 Sheet 21 of 31 indicates 18" Storm Drain. SH 16 an d SH 17 show storm drain lines extending beyond limit of work lines. Please clarify. 9/22/2022 SH-16 & SH-17 lines to be installed by GC are label ed. Other lines per separate plans. Note this is combined basin with o ff-site flow and backbone SD connection.
10/4/2022 3
14 Pre-Bid Site Utilities Site N/A SH-21 Note 82 9/22/2022 Sheet 21 note 82 indicates fire water POC per separate CWS Plans. Please clarify POC. 9/22/2022 POC is anticipated to be as depicted, Cal-Water to do TEE and Branch from backflow to building, by GC. 10/4/2022 3
15 Pre-Bid General General N/A N/A N/A 9/26/2022 Please co nfirm liquidated damages of $1000/day 9/26/2022 Confirmed 9/26/2022 2 16 Pre-Bid General General N/A N/A N/A 9/26/2022 Please co nfirm Prevailing wage determination bidders should use 9/26/2022 Please assume 2021-2 index for pricing. 9/26/2022 2 17 Pre-Bid Mechanical General N/A N/A N/A 9/26/2022 Please provide Mechanical specifications 9/28/2022 Located on plans 10/10/2022 NOT ISSUED 18 Pre-Bid Plumbing General N/A N/A N/A 9/26/2022 Please provide Plumbing specifications 9/28/2022 Located on plans 10/10/2022 NOT ISSUED 19 Pre-Bid Fire Protection General N/A N/A N/A 9/26/2022 Pl ease provide Fire Protection specifications 9/28/2022 20 Pre-Bid Waterproofing General N/A A5.2;
A6.2; A7.2
A5.2;
5/A3.4 9/26/2022 Referencing sheet A5.2, note #20 "water tight patio deck"... please advise on the waterproofing system to be provided for this pa tio. 9/28/2022 Hydrotech system is preferred, but Tremco 6100 is an approved alternate 10/6/2022 4
21 Pre-Bid Stud Framing General N/A N/A N/A 9/26/2022 Are there locations where flat strap backing or not ched backing is acceptable in lieu of 3/4" FRT plywood noted in the keynotes? 9/28/2022 22 Pre-Bid Waterproofing Elevator Pit N/A N/a N/A 9/26/202 2 Please confirm it is acceptable to provide Tremco w aterproofing at the elevator pits in lieu of Hydrotech (similar to what was installed at the El Segundo Top Golf).
9/28/2022 Tremco GC250 is an approved alternate for elevator pit 10/6/2022 4 TopGolf Montebello Prebid RFI Log
GMP RFI Log
10/28/2022 Page 1 of 5

Page 110 of 259 ends
Page 32 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Clarifications & Assumptions
RFI # Phase Trade / Work
Category Location Specification
Section
Sheet /
Drawing
Detail /
Page Date Created Question
Date
Submitted
(Design)
Response Date
Responded
Answer
Issued In
Add. No.

TopGolf Montebello Prebid RFI Log
GMP RFI Log
23 Pre-Bid Structural
Concrete Structure N/A N/A 4/S3.1 N/A Page S3.1 shows the slab going from 5" to 6" after the control joint. Please confirm that this intended to be 5" as shown in the Slab on Grade Schedule. 9/28/2022 Confirmed. 5" thick SOG is the intent. 10/11/2022 NOT ISSUED 24 Pre-Bid Structural
Concrete Structure N/A N/A A1.2B N/A
There are a pair of walk-in cold rooms (Cooler and Freezer) shown on the Middle Level. Please confirm the slab will need to be depressed at the Cooler & Freezer rooms.
9/28/2022 Structural slabs do not have depressions or steps d etailed. Arch to confirm. 10/11/2022
25 Pre-Bid General General N/A T1.1 N/A 9/26/2022
Please confirm EIFS, Metal Panel, and Glazing (i.e. , exterior elements) are required to be structurally engineered, but not sub mitted to the City as deferred approvals.
9/28/2022
26 Pre-Bid Insulation Room 101 N/A A5.2 GG 9/26/2022 Referencing page A5.2, section GG, is there a requi rement to provide acoustic and/or thermal insulation below the Roof Terrace (R oom #211)? 9/28/2022 Roof Terrace is #217, and thermal insulation is req uired below it, refer to 2/A6.3 & A2.2b KN 31 10/6/2022 4
27 Pre-Bid Insulation General N/A A6.4 N/A 9/26/2022
Referencing detail 1, 2, & 3 on A6.4. A continuous 1-1/2" rigid insulation is called out below the thickened edge of the of the s lab-on-grade. With the lack of freeze/thaw is this required for the Montebello location? 9/28/2022 24" of continuous rigid is required on interior sid e of footing / thickened edge 10/6/2022 4
28 Pre-Bid Structural
Concrete Structure N/A K4.2 25 9/27/2022
Detail 25 on page K4.2 shows a ramp from finished f loor to the floor of the coolers/freezers. Please confirm there is not a recessed slab beneath any of the cold rooms.
9/28/2022
29 Pre-Bid Sheet Metal Interior
Stairwell N/A A10.3 3, 4 9/27/2022
Referencing detail 3 & 4 on A10.3, a MTL-3 is calle d out for the draft stop at the stairwell. Please provide a detail to clarify the assembly (i.e., is MTL-3 is installed over metal stud framing & drywall?).
9/28/2022 Refer to 1/A8.6 10/6/2022 4
30 Pre-Bid
Steel, Misc.

Metals, Metal
Deck
Building 05000 N/A N/A 9/27/2022
Please provide fabrication drawings and erection pl an for Owner Furnished Contractor installed Steel, misc. metals and metal deck. Please provide model if available.
9/28/2022 Model is not available to Martin/Martin. 10/11/2022 NOT ISSUED 31 Pre-Bid
Exterior
Framing, Misc.

Metals
Building 05000 4/S5.6 N/A 9/27/2022
Detail 3/A3.3 shows the exterior stud walls extendi ng past the roof deck to the parapet. Please confirm it is acceptable to sto p the stud wall at the underside of roof deck, install an additional bent plate at edge of deck, then continue the stud wall above. Please confirm this detail will be provided in the OFCI steel as well.
9/28/2022
An alternate detail can be provided. See below:
10/11/2022 NOT ISSUED
32 Pre-Bid All 9/27/2022 Please confirm Bidders should hold their b ids for 120 days. 9/27/2022 Bidders should hold bids for 60 days 9/27/2022 2 33 Pre-Bid Mechanical Building N/A K & M
Sheets N/A 9/28/2022
Please confirm Kitchen Grease hood (including ansul system), Dishwasher Exhaust hood, kitchen exhaust fans, and makeup air unit are to be furnished and installed by owner.
9/28/2022 Furnished and installed by Contractor. Reference R S1.1 dated 09/06/2022 9/30/2022 3
34 Pre-Bid Kitchen Building N/A K Sheets N/A 9/28/2022
Please confirm Kitchen and Bar Equipment, walk in c ooler and associated refrigeration are owner furnished, owner installed and Kitchen drawings have been provided for coordination purposes only.
9/28/2022 Reference RS1.1 dated 09/06/2022 9/30/2022 3
35 Pre-Bid RS Building General N/A N/A 9/28/2022 Please advise if RS1.1 (Responsibility Schedule Sheet) are available for this project. 9/28/2022 Reference RS1.1 dated 09/06/2022 9/30/2022 3 36 Pre-Bid Plumbing Building N/A M6.9 N/A 9/28/2022
Plumbing subcontractor notes states “All plumbing f ixtures by ISI. Include faucets and waste fittings only”. Confirm plumber i s to F&I all kitchen sink faucets and, if so, provide manufacturer and model numbers for procurement 9/28/2022
37 Pre-Bid Plumbing Building N/A M6.11 N/A 9/28/2022 Confirm plumbing scope for beer/soda sleeves is for sleeves only and excludes all beverage conduit scope 9/28/2022 Reference RS1.1 dated 09/06/2022 9/30/2022 3 38 Pre-Bid HVAC Building N/A M6.11,
M6.12 Note F 9/28/2022
Confirm refrigerator/freezer remote condensing units and all refrigerant piping are furnished and installed by OWNER. HVAC to provide roof sleeves only.
9/28/2022
10/28/2022 Page 2 of 5

Page 111 of 259 ends
Page 33 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Clarifications & Assumptions
RFI # Phase Trade / Work
Category Location Specification
Section
Sheet /
Drawing
Detail /
Page Date Created Question
Date
Submitted
(Design)
Response Date
Responded
Answer
Issued In
Add. No.

TopGolf Montebello Prebid RFI Log
GMP RFI Log
39 Pre-Bid Paint Building N/A EM1.2A N/A 9/28/2022
Referencing Sheet EM1.2A. Please advise if column at 7.9/G.2 on the upper and middle levels is to be painted with intumescent paint. The column is noted to be painted with intumescent on the lower f loor. 9/28/2022 Correct. We will update drawings 10/6/2022 4
40 Pre-Bid General Building N/A K4.0R N/A 9/28/2022 Please confirm E Lite equipment pads per note G on K4.0R are owner furnished owner installed. 9/28/2022
41 Pre-Bid General Building N/A N/A N/A 9/28/2022 Please p rovide anticipated date for final City approval of the Building Permit. 9/29/2022 42 Pre-Bid Electrical Building N/A E0.02 N/A 9/28/2022 E0.02 mentions Lightning Protection. Please clarif y if this is required, and if so, identify where this system is to be located in the drawings 9/29/2022 E0.02 does not mention lightning protection. Noneth eless, lightning protection is not required. 10/6/2022 4
43 Pre-Bid Insulation Building N/A A6.4 2 9/28/2022
Referencing 2/A6.4, R-21 minimum stud cavity insula tion is noted @ the intermediate floor and R-19 minimum stud cavity ins ulation is noted @ the ground floor. Please confirm R-19 minimum is to be provided. 9/29/2022 provide R-19min. 10/6/2022 4
44 Pre-Bid Steel, Misc.

Metals Building 051200,
05500 N/A N/A 9/28/2022 Please provide Specification sections 051200 (Struc tural Steel) & 05500 (Misc.

Metals) 9/29/2022
45 Pre-Bid FRP Building N/A
A12.1b,
A12.2b,
A12.3b,
A9.1
FRP-1;
FRP-2 9/28/2022
The FRP Locations noted on the Room Finish Schedule A9.1 do not match the callouts on the Finish Plans (A12.1b, A12.2b, A12.3b). The following rooms on the Finish Plans show FRP but is not on the schedul e on A9.1:
•Sheet A12.1b – Cooler (FRP-2), 011 Linen Storage (FRP-1), 014 Hallway (FRP- 1)
•Sheet A12.2b – Cooler & Freezer, 108 Janitor’s Closet (FRP-1), 110 Hallway (FRP-2) , 116 Hallway (FRP-2)
•Sheet A12.3b – 205 Storage (FRP-1), 207 Janitor’s Closet (FRP-1). Please confirm that the Finish Location Plans A12.1b, .2b and .3b is correct for these specific areas.
9/29/2022
Follow plans, Room finish schedule to be updated

12.1b:

Hallway 014 (FRP-2)
Linen storage 022 (FRP-1) [Linens storage 011 tag w as incorrect] Cooler does not get FRP Tape & Sand w/ MR Gyp

12.2b:

Cooler & Freezer same as 12.1
Janitors closet is correct
Hallway 110 is correct
Hallway 116 is paint, refer to A10.2

12.3b:

Storage 205 is correct
Janitors closet is correct
10/7/2022 5
46 Pre-Bid Furniture Building N/A A12.5 N/A 9/29/2022 Please confirm all items listed on the furniture sc hedule on A12.5 are Owner Furnished, Contractor installed. 9/29/2022 Confirmed 10/6/2022 4 47 Pre-Bid Sheet Metal Building
07412
A9.1 &
G1.3
MTL-3 &
MTL-4 9/29/2022
Please confirm if ATAS "OR EQUAL" color match OMEGA LITE as approved 10/14/2019 is still approved and can be used as an accepted manufacturer for the Montebello Topgolf.
9/29/2022 Omegalite is an approved manufacturer 10/7/2022 5 48 Pre-Bid Concrete /
Rebar Site N/A SP1.1 Note 17 9/29/2022
SP1.1 calls out note NO. 17 for vehicular gate per 9/SP1.2 reference S sheets for footing requirements. S sheets do not appear to indicate footing requirements for this gate. Please advise of the footing width, length and depth along with reinforcement requirements size an d spacing or bar for bidders to assume.
9/29/2022 Reference civil for site structures. (Not on Civil either) 10/11/2022 NOT ISSUED 49 Pre-Bid Concrete /
Rebar Site N/A SP1.2 Detail 8 9/29/2022 Please provide rebar requirements for the concrete bench and retaining wall as shown on 8/SP1.2 9/29/2022 Reference civil for site structures. (Not on Civil either) 10/11/2022 NOT ISSUED 50 Pre-Bid Polished
Concrete Building N/A A9.1a PC-1 9/29/2022
Sheet A9.1 indicates Polished Concrete PC-11. No specification is provided, however clear direction regarding passes and grit are indicated. Is it possible to provide a performance specification with exposure and gloss requirements per the American Society of Concrete Contractors?
9/29/2022
Will be on sheet in next issuance
CPC Gloss Level: 4
CPC Aggregate exposure: B
10/7/2022 5
52 Pre-Bid Corner Guards Building N/A
A12.1b;
A12.2b;
A12.3b
CG1; CG2 9/29/2022
Corner Guards CG1 and CG2 are shown on Sheets A12.1 b, A12.2b and A12.3b. There are some rooms, such as 112-Kitchen, that has Corner Guards shown at some outside corners but not all. Please c onfirm that the locations of Corner Guards per the plan are correct.
9/29/2022 Provide Corner guards at all outside corners 10/6/2022 4 53 Pre-Bid Composite
Aluminum Panel Building A6.X 9/30/2022
Per e-mail from Laminators, the aluminum panel supp lier/manufacturer on El Segundo Top Golf, their composite aluminum panel sy stem is not tested to meet NFPA-285 with FRT furring strips for attachmen t (i.e., 3, 4/A7.1). (1) Referencing G1.3, please confirm Laminators is an a cceptable manufacturer. (2) Please advise if NFPA-285 is a requirement for this project. (3) If NFPA- 285 is a requirement of the project, Laminators wou ld suggest metal backing be utilized for their attachment in lieu of FRT, please confirm. 10/4/2022 Confirmed 10/7/2022 5
10/28/2022 Page 3 of 5

Page 112 of 259 ends
Page 34 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Clarifications & Assumptions
RFI # Phase Trade / Work
Category Location Specification
Section
Sheet /
Drawing
Detail /
Page Date Created Question
Date
Submitted
(Design)
Response Date
Responded
Answer
Issued In
Add. No.

TopGolf Montebello Prebid RFI Log
GMP RFI Log
54 Pre-Bid Roof Screen Building A3.1b note 7 Referencing A3.1b, note 7. Please confirm the Metal Sales T-5 wall material is aluminum, not steel. 10/4/2022 Use 24 ga. Ribbed metal decking. Will upda te for next issuance 10/7/2022 5 55 Pre-Bid Site Utility Site Sheet 27 3/P-2 10/3/2022 This note states the Engineer is to determine if bedding is required. Please advise if bedding is required and if so, what is th e required thickness? 10/4/2022 GC to plan on minimum 6" bedding per Greenbook 217 & Geo-Tech requirement of Sand equivalent greater than 30. Not e: Final bedding determination by field soil engineer based on field soil conditions 10/7/2022 5
56 Pre-Bid Site Utility Site Sheet 21 Note 86 10/3/2022 Wh at is the 12” sleeve material type/requirement? 10/4/2022 Steel casing ASTM A283 Grade C, 5/16" wall. GC may opt for 16" casing for ease of construction 10/7/2022 5
57 Pre-Bid Site Utility Site Sheet 21 10/3/2022
There are various call outs and notes for separate plans. Please provide the following separate plans called out:
a.CWS Plans
b.LACSD Plans
c.Public Water Plans (Per Meter Vault callout)
d.Fire Hydrant Plans
10/4/2022 Ref. Civil markups provided in addenda 3. 10/6/2022 4 58 Pre-Bid Site Utility Site Sheet 21 10/3/2022
There is a call out for 8” PVC Public Sewer and 8” PVC Public Water, per separate plans. Is this work intended to be include d with the Site Utilities scope of work? If so, please provide the separate plans. 10/4/2022 Ref. Civil markups provided in addenda 3. 10/6/2022 4 59 Pre-Bid Site Utility Site Sheet 16 & 17 10/3/2022
There is a call out for 24” and 12” HDPE per separa te plans. Is this work intended to be included with the Site Utilities sco pe of work? If so, please provide these separate plans.
10/4/2022 Ref. Civil markups provided in addenda 3. 10/6/2022 4 60 Pre-Bid Site Utility Site Sheet 16 & 17 Note 51C 10/3/ 2022 Please provide separate plans if work is to be incl uded as part of this scope of work. 10/4/2022 Ref. Civil markups provided in addenda 3. 10/6/2022 4 61 Pre-Bid Site Utility Site Sheet 17 10/3/2022
There is a call out for separate Clubhouse plans. A re the Clubhouse plans intended to be included with the Site Utilities sco pe of work? If so, please provide the Clubhouse plans.
10/4/2022 Ref. Civil markups provided in addenda 3. 10/6/2022 4 62 Pre-Bid Electrical Building S5.2 5 10/3/2022 Detail 5/S5.2 calls out a light pole at the roof le vel. Please confirm light poles are not required at the roof level? 10/4/2022 Light Poles are not required on roof. 10/6/2022 4 63 Pre-Bid Electrical Building LV0.0 - LV

4.2 10/4/2022 Please confirm the Owner will be providing the Secu rity / Access Control cabling, system and devices. 10/4/2022 Owner Furnished. 10/7/2022 5 64 Pre-Bid Electrical Building LV0.0 - LV

4.2 10/4/2022 Please confirm the Owner will be providing the Audi o Visual Cabling, system and devices. 10/4/2022 Owner Furnished. 10/7/2022 5
65 Pre-Bid Electrical Building LV0.0 - LV

4.2 10/4/2022 Please confirm the Owner will be providing the Stru ctured and Wi-Fi cabling, system and devices. 10/4/2022 Owner Furnished. 10/7/2022 5 66 Pre-Bid Elevators Building 10/4/2022 Please confirm Elevator B requires a capacity of 35 00 lbs for gurney compliance. 10/4/2022 Elevator B is not required to be gurney sized, but still needs to carry kitchen equipment and supplies 10/7/2022 5
67 Pre-Bid Electrical Building E9.02 Detail 7 10/4/2022 Reference typical Tee Line Column / Power Facing CL 3 detail. Please provide manufacture and catalog information for the GFCI mo dule 10/4/2022 Leviton - GFRBF. Confirm Color. 10/6/2022 4 68 Pre-Bid Smoke
Containment Building A8.5 Detail 9 10/4/2022 Detail 9 indicates Smoke Curtain to be US Smoke & F ire, SD60GS, Please confirm that Smoke Guard will be considered an 'or equal' manufacturer. 10/4/2022 Correct 10/7/2022 5 69 Pre-Bid Electrical Building E1.3 10/4/2022 Please prov ide shop drawings for Qualite System. 10/4/2022 70 Pre-Bid Finished
Carpentry Building A11.4 Detail
3,4,5 10/4/2022
Bar 202 Elevations 3, 4, 5/A11.4 call for SC-1 Seal ed Concrete at curb below Upper Counter and ADA Counter. Detail 9/A11.3 ADA Accessible Countertop AXO Drawing calls for Recess Granite Curb @ ADA Counter at wall below die wall and at bump out at curb. Section Cut 6/A11.3 s im. is provided at the ADA Counter in Elevation 4/A11.4 and shows G2 adhered t o the die wall substrate, it is not depicted as a curb condition as shown in Elevations. Please confirm Detail 6/A11.3 Sim. callout for G2 by Millwork atta ched to die wall supersedes elevation callout for SC-1 Curb by others.
10/4/2022
Will update sheets for clarity in next issuance
Ground Level: Granite finish
Middle Level: Granite finish
Upper Level: Concrete finish
10/7/2022 5
71 Pre-Bid Electrical Building General 10/4/2022 Please confirm the Owner will be providing all fixt ures and T24 Lighting controls will be by the electrical contractor. 10/4/2022 Villa lighting provides all control device s. 10/6/2022 4 72 Pre-Bid Electrical Site E1.00 Reference Sheet E1.00 / EP-46 HD Spectacular. Please provide HD Spectacular Drawings. 10/4/2022
10/28/2022 Page 4 of 5

Page 113 of 259 ends
Page 35 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Clarifications & Assumptions
RFI # Phase Trade / Work
Category Location Specification
Section
Sheet /
Drawing
Detail /
Page Date Created Question
Date
Submitted
(Design)
Response Date
Responded
Answer
Issued In
Add. No.

TopGolf Montebello Prebid RFI Log
GMP RFI Log
73 Pre-Bid Misc. Metals Building N/A RS1.1 N/A 10/21/2022 Referencing RS1.1, stairs and parapet wall supports are called out as deferred submittals, however these are both Owner furnished/Contractor installed.

Please confirm the Owner will provide the deferred approval for both stairs and parapet wall supports for contractor installati on. 10/21/2022
Our understanding is that the stairs will be provid ed in the steel package as they normally are. We have designed the structural for the stairs and they are not a deferred item. Simil arly, M/M has designed supports for the parapet walls so the roof and parapet walls can be put in place before the building is enclosed . It is our understanding that this will also be provided in th e steel package and M/M will provide the design.
10/24/2022 NOT ISSUED
74 Pre-Bid Steel Building N/A S sheets ATTACHM
NET 10/21/2022
In an effort to align with the Topgolf Furnished st eel shop drawings and to prepare the grid system for coordination with our t rade partners and self- perform team, we are requesting clarification to tw enty-two (22) items.

Referencing the attached plan sheets, please provid e clear direction to our grid system questions.
10/21/2022
75 Pre-Bid Steel Building N/A S3.2, S3.3 10/24/2022
Referencing S3.2 & S3.3, #9 anchor bars are called out to be attached to the side of the flanges at the moment frame columns. No te 3 calls out the option to utilize mechanical couplers (shop welded) in lie u of field welding these anchor bars. Please confirm the shop welded mechani cal couplers are Owner furnished for contractor to thread #9 bars through.
10/24/2022
76 Pre-Bid Steel Building N/A

ATTACHMENT
10/26/2022
Referencing S3.2 & S3.3, #9 anchor bars are called out to be attached to the side of the flanges at the moment frame columns. To maintain project schedule, these structural steel columns will need to be provided prior pouring the foundations.
10/28/2022
77 Pre-Bid Electrical Building 16400 E0.03 2.1.A 10/28/2022 The approved switchgear manufacturers listed in the specifications are unable to provide switchgear in alignment with the project schedule for permanent power. Eaton Switchgear is the only manu facturer that has indicated they can provide switchgear within a time ly manner to comply with the schedule. Eaton switchgear was an approved man ufacturer and was successfully installed at the El Segundo Top Golf F acility. Please review and confirm if Eaton can be added to the list of accept able manufacturers for the switchgear.
10/28/2022
78 Pre-Bid
79 Pre-Bid
10/28/2022 Page 5 of 5

Page 114 of 259 ends

5 VALUE ANALYSIS LOG

Page 115 of 259 ends
Page 37 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Value Analysis Log
Topgolf Montebello Value Analysis Log
GMP November 8, 2022
Item
Number Name Description Item Cost / ROM Status Notes
1 Sound Insulation Fiberglass Sound Insulation in lieu of Thermafiber (30,000)$ Pending Accepted at Topgolf El Segundo
2 Column Covers
Provide Diamond Perforated column covers in lieu of
McNichols Perforated Materials for MTL-6 (50,000)$
Pending Accepted at Topgolf
El Segundo
3 Revise Irrigation Revise Lateral Drip spacing from 12" oc to 18" oc (47,000)$ Pending 4 Irrigation Controller
Install IQ weather card within controller in lieu of
freestanding Weather Station (16,000)$ Pending 5 Hitting Bay Glass Thickness
Revise curtain wall at hitting bays to non insulated
glass with pocket for 1/4 inches glass (Replacing G6
glass (1 inch IGU Grey Tint) with G2 glass (1/4 inch
Grey Tint) (30,000)$
Pending Accepted at Topgolf
El Segundo
6 ProPress for Domestic Water
ProPress for Domestic Water Systems in lieu of
solder/brazed (Does not assume engineering costs) (45,000)$ Pending Reviewed at El
Segundo
7 Provide mix Aluminum/ copper
Bus for Switchgear
Revise switchgear bus material from copper per the
specifications to a mix of copper & aluminum per
PCX proposal. (65,000)$
Pending
8 Reduce Intumescent Paint
Reduce intumescent and provide fireproofing -
trowel finish similar to El Segundo (35,000)$ Pending 9 Replace Asphalt with CMB (2"
AC/4" AB) Revise to 6" AB - CMB (82,000)$ Pending 10 Reduce the od size of the WD-1
Soffit to match ML Floor
Opening
WD-1 Wood Ceiling at Dining Area 101, per A2.2a,
reference details 8/A11.3. REF. DSK-4 MTL Soffit (143,000)$ Pending
11 Use V2 Hardee Board Col
Wraps at CL#2
Cannot be taken with Item #2. Replace MTL column
covers with Fiber Cement Board. REF DSK-8 346,000$
Pending Cannot be taken with
#2

Page 116 of 259 ends
Page 38 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Value Analysis Log
Topgolf Montebello Value Analysis Log
GMP November 8, 2022
Item
Number Name Description Item Cost / ROM Status Notes
12 Remove Tile from UL Bar and
adjacent hallways
Remove T-13 at room 201 and replace with polished
concrete. REF DSK-9 TBD
Pending Topgolf to confirm
stair 2 adjustment
can be implemented
13 Remove vent windows at
sawtooth
eplace OO-2, MM-2, NN-2, and LL-2 with fixed glazing
in lieu of vented. REF DSK-3 (44,000)$ Pending 14 Remove "bus stop" patio bench
feature
Remove bench, IPE canopy, steel, footings, rebar and
fans. REF DSK-1 TBD Pending
15 Remove Granite Curbs
Remove G-2 base callout at details 2 and 3 / A11.3;
5/A11.3; 6/A11.3; 1/A11.5; 2/A11.5; 6/A11.5;
7/A11.5; 12, 11/A11.5. REF DSK-2 TBD
Pending
16 Remove mirrors in UL event
space
Remove MR-1 at 2/A11.2 and replace with WC-5.

REF DSK-5 TBD Pending
17 Replace Oak Vinyl w/ Hufcor
Finish on Operable Partition
Replace operable partition finish WV-1 per A9.1a
with WC-5 TBD
Pending
18 Remove tile from non-wet
walls in gang RR
Delete Tile from non wet walls at all Gang Restrooms
- Ref. A8.1. Restrooms 009, 105, 209, 008, 104, 208 -
replace with Paint - pattern P-14, P-15, P-5. REF DSK- 7 (25,000)$
Pending
Totals (266,000)$

Page 117 of 259 ends

6 ALLOWANCE LOG

Page 118 of 259 ends
Page 40 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Allowance Log
Topgolf Montebello Allowance Log
GMP November 8, 2022
Item
Number Name Allowance Notes
1 Construction Allowance - E&O, OFCI Materials, TG Field Changes, Permit Comments 500,000$
2 Coring, Patching, Flashing, Fireproofing 25,000$
3 Topgolf Trailer Rentals 13,500$
4 Access Gates 5,000$
5 Security Fencing for Topgolf 25,000$
6 Utility Usage 5,000$
7 Façade Signage Conduit 30,000$
8 Landscape 288,000$ $12/SF @ 24,000 SF
9 Temporary Generator 110,000$ 2 months
10 Facility and site improvement materials purchased from Topgolf 6,227,828$ 7,229,328$

Page 119 of 259 ends

7 SCHEDULE

Page 120 of 259 ends
Page 42 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
Topgolf MontebelloTopgolf Montebello 318 Sep-19-22 A Dec-29-23 0 Project Summary and MilestonesProject Summary and Milestones 318 Sep-19-22 A Dec-29-23 0 PreconstructionPreconstruction 16 Sep-19-22 A Nov-13-22 4 ML-1900 NTP for PreConstruction 0 Sep-19-22 A
ML-4650 GMP Summary (Calendar Days) 22 Sep-19-22 A Nov-13-22 4 ConstructionConstruction 265 Nov-14-22 Dec-01-23 19
ML-1920 Mobilize 5 Nov-14-22 Nov-18-22 16
ML-1870 Construction Summary (Workdays) 254 Nov-14-22 Nov-14-23 0 ML-1960 NTP for Construction 0 Nov-14-22* 0
ML-3810 Construction Summary (Calendar Days) 366 Nov-14-22 Nov-14-23 0 ML-1730 Earthwork 5 Nov-22-22 Nov-30-22 10
ML-9480 Foundations 15 Dec-01-22 Dec-21-22 12
ML-9510 Underground BIM Coordination Complete 0 Dec-19-22 15 ML-1700 Slab-on-Grade 31 Dec-22-22 Feb-06-23 71
ML-1740 Superstructure Summary 44 Feb-20-23 Apr-20-23 0 ML-1620 Top Out Structural Steel (Venue) 0 Mar-09-23 0
ML-9520 Level 1 BIM Coordination Complete 0 Apr-04-23 3 ML-9530 Level 2 BIM Coordination Complete 0 Apr-04-23 10 ML-9540 Level 3 BIM Coordination Complete 0 Apr-04-23 13 ML-9550 Roof Level BIM Coordination Complete 0 Apr-05-23 19 ML-1750 Building Enclosure Summary 100 May-04-23 Sep-25-23 7 ML-1710 Slab on Metal Deck Complete 0 May-05-23 4
ML-7602 Interior Buildout Summary 85 Jun-07-23 Oct-05-23 5 ML-7520 Gas Available 0 Jun-27-23 76
ML-1570 Substantial Building Dry-in 0 Jun-30-23 0
ML-9470 Site Utilities 31 Jul-21-23 Sep-01-23 0
ML-7540 Telephone / Data Available 0 Sep-01-23 19
ML-7530 Water Available 0 Sep-19-23 20
ML-2410 Final Building Dry-in 0 Sep-25-23 7
ML-1690 Permanent Power Available 0 Sep-26-23 3
ML-7702 Driving Range Outfield Owner Installation (Calendar Days) 21 Sep-29-23 Oct-19-23 8 ML-9500 Permanent Power Required 0 Sep-29-23 0
ML-4901 MEP Start-up and T esting 15 Oct-02-23 Oct-20-23 1 ML-2620 Punchlist & Corrections 30 Oct-18-23 Dec-01-23 19 ML-1860 Health Department Final Inspection 0 Oct-27-23 0 ML-9490 Elevator State Inspection 0 Oct-27-23 0
ML-1510 Inclement Weather Allowance 10 Oct-31-23 Nov-14-23 0 ML-1590 Substantial Completion 0 Nov-14-23 0
Close-out / Move-inClose-out / Move-in 30 Nov-15-23 Dec-29-23 0 ML-1530 Commissioning / Closeout 30 Nov-15-23 Dec-29-23 0 ML-1840 Owner Move-In / Training (Calendar Days) 42 Nov-15-23 Dec-26-23 3 ML-1540 Final Completion 0 Dec-29-23 0
ML-1850 Open For Business (Calendar Days) 0 Dec-29-23* 0 Trade Procurement & GMP DevelopmentTrade Procurement & GMP Development 22 Sep-19-22 A Oct-25-22 16 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
NTP for PreConstruction
GMP Summary (Calendar Days)
Mobilize
Construction Summary (Workdays)
NTP for Construction
Construction Summary (Calendar Days)
Earthwork
Foundations
Underground BIM Coordination Complete
Slab-on-Grade
Superstructure Summary
Top Out Structural Steel (Venue)
Level 1 BIM Coordination Complete
Level 2 BIM Coordination Complete
Level 3 BIM Coordination Complete
Roof Level BIM Coordination Complete
Building Enclosure Summary
Slab on Metal Deck Complete
Interior Buildout Summary
Gas Available
Substantial Building Dry-in
Site Utilities
Telephone / Data Available
Water Available
Final Building Dry-in
Permanent Power Available
Driving Range Outfield Owner Installation (Calendar Days) Permanent Power Required
MEP Start-up and T esting
Punchlist & Corrections
Health Department Final Inspection
Elevator State Inspection
Inclement Weather Allowance
Substantial Completion
Commissioning / Closeout
Owner Move-In / Training (Calendar Days)
Final Completion
Open For Business (Calendar Days)
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 1 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 121 of 259 ends
Page 43 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
Guaranteed Maximum PriceGuaranteed Maximum Price 22 Sep-19-22 A Oct-25-22 16 110325 GMP Pricing 10 Sep-19-22 A Oct-11-22 0
110574 GMP Owner Review / Negotiation 10 Oct-12-22 Oct-25-22 16 110584 GMP Approval 0 Oct-25-22 16
AdministrationAdministration 252 Oct-12-22 Oct-10-23 21 Buyout / ContractingBuyout / Contracting 40 Oct-12-22 Dec-09-22 28 Early TradesEarly Trades 30 Oct-12-22 Nov-23-22 28
BO2800 Award & Execute - Electrical 14 Oct-12-22 Oct-31-22 3 BO2810 Award & Execute - Earthwork 17 Oct-12-22 Nov-03-22 18 BO2820 Award & Execute - Plumbing 14 Oct-12-22 Oct-31-22 18 BO2830 Award & Execute - Site Utilities 13 Oct-12-22 Oct-28-22 6 BO2840 Award & Execute - Structural Steel 18 Oct-12-22 Nov-04-22 0 BO2850 Award & Execute - Rebar 14 Oct-12-22 Oct-31-22 18 BO2860 Award & Execute - Elevator 20 Oct-12-22 Nov-08-22 8 BO2870 Award & Execute - Trailer 10 Oct-12-22 Oct-25-22 23 BO2880 Award & Execute - Glazing 30 Oct-12-22 Nov-23-22 7 BO2890 Award & Execute - Mechanical 20 Oct-12-22 Nov-08-22 0 BO2891 Award & Execute - Waterproofing 20 Oct-12-22 Nov-08-22 38 SM- 1140 Procure Office Trailer 5 Oct-26-22 Nov-01-22 23 Remaining T radesRemaining T rades 40 Oct-12-22 Dec-09-22 28 BO2750 Award Remaining Subcontracts 40 Oct-12-22 Dec-09-22 28 PermitsPermits 90 Oct-26-22 Mar-07-23 117
PE2900 Fire Prevention Permit 60 Oct-26-22 Jan-24-23 147 PE2920 SoCal Gas Company Permit 45 Oct-26-22 Jan-03-23 154 PE2930 Data/Telephone Permit 30 Oct-26-22 Dec-09-22 138 PE2940 Via Campo Street Permit 90 Oct-26-22 Mar-07-23 16 PE2950 Design / Revised Foundation Detail 10 Nov-07-22* Nov-21-22 10 PE2960 City Approval of Revised Foundation Detail 10 Nov-22-22 Dec-07-22 10 Deferred ApprovalsDeferred Approvals 203 Oct-31-22 Aug-18-23 22 VenueVenue 203 Oct-31-22 Aug-18-23 22
Fire Service MainFire Service Main 82 Oct-31-22 Feb-28-23 122 DA1000 Develop & Submit - Fire Service Main 15 Oct-31-22 Nov-21-22 18 DA1010 McCarthy Review & Approve - Fire Service Main 2 Nov-22-22 Nov-23-22 18 DA1020 A/E Review & Approve - Fire Service Main 10 Nov-28-22 Dec-09-22 18 DA1030 City Review & Approve - Fire Service Main 20 Dec-12-22 Jan-10-23 122 DA1040 Procure Early Fire Riser Feed - Fire Service Main 1 Dec-12-22 Dec-12-22 18 DA1840 Revise & Resubmit - Fire Service Main 5 Jan-11-23 Jan-17-23 122 DA1850 City Review & Approve Rev01 - Fire Service Main 10 Jan-18-23 Jan-31-23 122 DA1060 Procure Material - Fire Service Main 20 Feb-01-23 Feb-28-23 122 Fire Sprinkler SystemFire Sprinkler System 87 Dec-12-22 Apr-13-23 37 DA1070 Develop & Submit - Fire Sprinkler System 20 Dec-12-22 Jan-10-23 37 DA1080 McCarthy Review & Approve - Fire Sprinkler System 2 Jan-11-23 Jan-12-23 37 DA1090 A/E Review & Approve - Fire Sprinkler System 10 Jan-13-23 Jan-26-23 37 DA1100 City Review & Approve - Fire Sprinkler System 20 Jan-27-23 Feb-23-23 37 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
GMP Pricing
GMP Owner Review / Negotiation
GMP Approval
Award & Execute - Electrical
Award & Execute - Earthwork
Award & Execute - Plumbing
Award & Execute - Site Utilities
Award & Execute - Structural Steel
Award & Execute - Rebar
Award & Execute - Elevator
Award & Execute - Trailer
Award & Execute - Glazing
Award & Execute - Mechanical
Award & Execute - Waterproofing
Procure Office Trailer
Award Remaining Subcontracts
Fire Prevention Permit
SoCal Gas Company Permit
Data/Telephone Permit
Via Campo Street Permit
Design / Revised Foundation Detail
City Approval of Revised Foundation Detail
Develop & Submit - Fire Service Main
McCarthy Review & Approve - Fire Service Main
A/E Review & Approve - Fire Service Main
City Review & Approve - Fire Service Main
Procure Early Fire Riser Feed - Fire Service Main
Revise & Resubmit - Fire Service Main
City Review & Approve Rev01 - Fire Service Main
Procure Material - Fire Service Main
Develop & Submit - Fire Sprinkler System
McCarthy Review & Approve - Fire Sprinkler System
A/E Review & Approve - Fire Sprinkler System
City Review & Approve - Fire Sprinkler System
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 2 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 122 of 259 ends
Page 44 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
DA1110 Revise & Resubmit - Fire Sprinkler System 5 Feb-24-23 Mar-02-23 37 DA1120 City Review & Approve Rev01 - Fire Sprinkler System 10 Mar-03-23 Mar-16-23 37 DA1130 Procure Material - Fire Sprinkler System 20 Mar-17-23 Apr-13-23 37 ElevatorsElevators 190 Nov-09-22 Aug-10-23 8
DA1700 Develop & Submit - Elevators 25 Nov-09-22 Dec-16-22 8 DA1710 McCarthy Review & Approve - Elevators 5 Dec-19-22 Dec-23-22 8 DA1720 A/E Review & Approve - Elevators 10 Dec-27-22 Jan-10-23 8 DA1730 City Review & Approve - Elevators 20 Jan-11-23 Feb-07-23 8 DA1740 Revise & Resubmit - Elevators 5 Feb-08-23 Feb-14-23 8 DA1750 City Review & Approve Rev01 - Elevators 15 Feb-15-23 Mar-07-23 8 DA1760 Procure Material - Elevators 110 Mar-08-23 Aug-10-23 8 Fire A lar m Syste mFire A lar m Syste m 97 Dec-12-22 Apr-27-23 30 DA1140 Develop & Submit - Fire Alarm System 20 Dec-12-22 Jan-10-23 30 DA1150 McCarthy Review & Approve - Fire Alarm System 2 Jan-11-23 Jan-12-23 30 DA1160 A/E Review & Approve - Fire Alarm System 10 Jan-13-23 Jan-26-23 30 DA1170 City Review & Approve - Fire Alarm System 20 Jan-27-23 Feb-23-23 30 DA1180 Revise & Resubmit - Fire Alarm System 5 Feb-24-23 Mar-02-23 30 DA1190 City Review & Approve Rev01 - Fire Alarm System 10 Mar-03-23 Mar-16-23 30 DA1200 Procure Material - Fire Alarm System 30 Mar-17-23 Apr-27-23 30 Pre-Engineered Fire Extinguishing SystemPre-Engineered Fire Extinguishing System 147 Dec-12-22 Jul-10-23 33 DA1210 Develop & Submit - Pre-Engineered Fire Extinguisher System 40 Dec-12-22 Feb-07-23 33 DA1220 McCarthy Review & Approve - Pre-Engineered Fire Extinguisher System 2 Feb-08-23 Feb-09-23 33 DA1230 A/E Review & Approve - Pre-Engineered Fire Extinguisher System 10 Feb-10-23 Feb-23-23 33 DA1240 City Review & Approve - Pre-Engineered Fire Extinguisher System 20 Feb-24-23 Mar-23-23 33 DA1250 Revise & Resubmit - Pre-Engineered Fire Extinguisher System 5 Mar-24-23 Mar-30-23 33 DA1260 City Review & Approve Rev01 - Pre-Engineered Fire Extinguisher System 10 Mar-31-23 Apr-13-23 33 DA1270 Procure Material - Pre-Engineered Fire Extinguisher System 60 Apr-14-23 Jul-10-23 33 StairsStairs 126 Nov-07-22 May-08-23 48
DA1280 Develop & Submit - Stairs 1 & 4 20 Nov-07-22 Dec-07-22 48 DA1290 McCarthy Review & Approve - Stairs 1 & 4 1 Dec-08-22 Dec-08-22 48 DA1300 A/E Review & Approve - Stairs 1 & 4 10 Dec-09-22 Dec-22-22 48 DA1310 City Review & Approve - Stairs 1 & 4 20 Dec-23-22 Jan-23-23 48 DA1320 Revise & Resubmit - Stairs 1 & 4 5 Jan-24-23 Jan-30-23 48 DA1330 City Review & Approve Rev01 - Stairs 1 & 4 10 Jan-31-23 Feb-13-23 48 DA1340 Procure Material - Stairs 1 & 4 60 Feb-14-23 May-08-23 48 Handrail/GuardrailHandrail/Guardrail 116 Nov-07-22 Apr-24-23 101 DA1350 Develop & Submit - Handrail/Guardrail Stair 1 & 4 20 Nov-07-22 Dec-07-22 101 DA1360 McCarthy Review & Approve - Handrail/Guardrail Stair 1 & 4 1 Dec-08-22 Dec-08-22 101 DA1370 A/E Review & Approve - Handrail/Guardrail Stair 1 & 4 10 Dec-09-22 Dec-22-22 101 DA1380 City Review & Approve - Handrail/Guardrail Stair 1 & 4 20 Dec-23-22 Jan-23-23 101 DA1390 Revise & Resubmit - Handrail/Guardrail Stair 1 & 4 5 Jan-24-23 Jan-30-23 101 DA1400 City Review & Approve Rev01 - Handrail/Guardrail Stair 1 & 4 10 Jan-31-23 Feb-13-23 101 DA1410 Procure Material - Handrail/Guardrail Stair 1 & 4 50 Feb-14-23 Apr-24-23 101 Parapet Wall Supp ortParapet Wall Supp ort 77 Dec-12-22 Mar-30-23 30 DA1420 Develop & Submit - Parapet Wall Support 20 Dec-12-22 Jan-10-23 30 DA1430 McCarthy Review & Approve - Parapet Wall Support 2 Jan-11-23 Jan-12-23 30 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Revise & Resubmit - Fire Sprinkler System
City Review & Approve Rev01 - Fire Sprinkler System
Procure Material - Fire Sprinkler System
Develop & Submit - Elevators
McCarthy Review & Approve - Elevators
A/E Review & Approve - Elevators
City Review & Approve - Elevators
Revise & Resubmit - Elevators
City Review & Approve Rev01 - Elevators
Procure Material - Elevators
Develop & Submit - Fire Alarm System
McCarthy Review & Approve - Fire Alarm System
A/E Review & Approve - Fire Alarm System
City Review & Approve - Fire Alarm System
Revise & Resubmit - Fire Alarm System
City Review & Approve Rev01 - Fire Alarm System
Procure Material - Fire Alarm System
Develop & Submit - Pre-Engineered Fire Extinguisher System McCarthy Review & Approve - Pre-Engineered Fire Extinguisher System A/E Review & Approve - Pre-Engineered Fire Extinguisher System City Review & Approve - Pre-Engineered Fire Extinguisher System Revise & Resubmit - Pre-Engineered Fire Extinguisher System City Review & Approve Rev01 - Pre-Engineered Fire Extinguisher System Procure Material - Pre-Engineered Fire Extinguisher System Develop & Submit - Stairs 1 & 4
McCarthy Review & Approve - Stairs 1 & 4
A/E Review & Approve - Stairs 1 & 4
City Review & Approve - Stairs 1 & 4
Revise & Resubmit - Stairs 1 & 4
City Review & Approve Rev01 - Stairs 1 & 4
Procure Material - Stairs 1 & 4
Develop & Submit - Handrail/Guardrail Stair 1 & 4
McCarthy Review & Approve - Handrail/Guardrail Stair 1 & 4 A/E Review & Approve - Handrail/Guardrail Stair 1 & 4
City Review & Approve - Handrail/Guardrail Stair 1 & 4
Revise & Resubmit - Handrail/Guardrail Stair 1 & 4
City Review & Approve Rev01 - Handrail/Guardrail Stair 1 & 4 Procure Material - Handrail/Guardrail Stair 1 & 4
Develop & Submit - Parapet Wall Support
McCarthy Review & Approve - Parapet Wall Support
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 3 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 123 of 259 ends
Page 45 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
DA1440 A/E Review & Approve - Parapet Wall Support 10 Jan-13-23 Jan-26-23 30 DA1450 City Review & Approve - Parapet Wall Support 20 Jan-27-23 Feb-23-23 30 DA1460 Revise & Resubmit - Parapet Wal l Support 5 Feb-24-23 Mar-02-23 30 DA1470 City Review & Approve Rev01 - Parapet Wall Support 10 Mar-03-23 Mar-16-23 30 DA1480 Procure Material - Parapet Wal l Support 10 Mar-17-23 Mar-30-23 30 Exterior Curtain WallExterior Curtain Wall 186 Nov-28-22 Aug-18-23 22 DA1490 Develop & Submit - Exterior Curtain Wall 45 Nov-28-22 Jan-31-23 7 DA1500 McCarthy Review & Approve - Exterior Curtain Wall 1 Feb-01-23 Feb-01-23 7 DA1510 A/E Review & Approve - Exterior Curtain Wall 10 Feb-02-23 Feb-15-23 7 DA1520 City Review & Approve - Exterior Curtain Wall 20 Feb-16-23 Mar-15-23 7 DA1530 Revise & Resubmit - Exterior Curtain Wall 5 Mar-16-23 Mar-22-23 7 DA1540 City Review & Approve Rev01 - Exterior Curtain Wall 10 Mar-23-23 Apr-05-23 7 DA1960 Drawing Revisions - Exterior Curtain Wall 10 Apr-06-23 Apr-19-23 7 DA1550 Fabricate & Deliver - Aluminum Framing Curtain Wall 85 Apr-20-23 Aug-18-23 7 DA1940 Fabricate & Deliver - Glazing Curtain Wall 85 Apr-20-23 Aug-18-23 22 Exterior StorefrontExterior Storefront 171 Nov-28-22 Jul-28-23 37 DA1560 Develop & Submit - Exterior Storefront 30 Nov-28-22 Jan-10-23 22 DA1570 McCarthy Review & Approve - Exterior Storefront 1 Jan-11-23 Jan-11-23 22 DA1580 A/E Review & Approve - Exterior Storefront 10 Jan-12-23 Jan-25-23 22 DA1590 City Review & Approve - Exterior Storefront 20 Jan-26-23 Feb-22-23 22 DA1600 Revise & Resubmit - Exterior Storefront 10 Feb-23-23 Mar-08-23 22 DA1610 City Review & Approve Rev01 - Exterior Storefront 5 Mar-09-23 Mar-15-23 22 DA1970 Drawing Revisions - Exterior Storefront 10 Mar-16-23 Mar-29-23 22 DA1620 Fabricate & Deliver - Aluminum Framing Storefront 85 Mar-30-23 Jul-28-23 22 DA1860 Fabricate & Deliver - Storefront Doors / Automatic Sliding Doors 80 Mar-30-23 Jul-21-23 29 DA1950 Fabricate & Deliver - Glazing Storefront 50 Mar-30-23 Jun-08-23 72 Glass GuardrailGlass Guardrail 161 Nov-28-22 Jul-14-23 24 DA1870 Develop & Submit - Glass Guardrail 45 Nov-28-22 Jan-31-23 24 DA1880 McCarthy Review & Approve - Glass Guardrail 1 Feb-01-23 Feb-01-23 24 DA1890 A/E Review & Approve - Glass Guardrail 10 Feb-02-23 Feb-15-23 24 DA1900 City Review & Approve - Glass Guardrail 20 Feb-16-23 Mar-15-23 24 DA1910 Revise & Resubmit - Glass Guardrail 5 Mar-16-23 Mar-22-23 24 DA1920 City Review & Approve Rev01 - Glass Guardrail 10 Mar-23-23 Apr-05-23 24 DA1980 Drawing Revisions - Glass Guardrail 10 Apr-06-23 Apr-19-23 24 DA1930 Fabricate & Deliver - Glass Guardrail 60 Apr-20-23 Jul-14-23 24 Suspended Ceiling & Suspended ElementsSuspended Ceiling & Suspended Elements 147 Dec-12-22 Jul-10-23 45 DA1630 Develop & Submit - Suspended Ceiling & Suspended Elements 40 Dec-12-22 Feb-07-23 45 DA1640 McCarthy Review & Approve - Suspended Ceiling & Suspended Elements 2 Feb-08-23 Feb-09-23 45 DA1650 A/E Review & Approve - Suspended Ceiling & Suspended Elements 10 Feb-10-23 Feb-23-23 45 DA1660 City Review & Approve - Suspended Ceiling & Suspended Elements 20 Feb-24-23 Mar-23-23 45 DA1670 Revise & Resubmit - Suspended Ceiling & Suspended Elements 5 Mar-24-23 Mar-30-23 45 DA1680 City Review & Approve Rev01 - Suspended Ceiling & Suspended Elements10 Mar-31-23 Apr-13-23 45 DA1690 Procure Material - Suspended Ceiling & Suspended Elements 60 Apr-14-23 Jul-10-23 45 Driving Range PolesDriving Range Poles 81 Nov-29-22 Mar-23-23 78 DA1770 Develop & Submit - Driving Range Poles (Owner) 10 Nov-29-22 Dec-12-22 78 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
A/E Review & Approve - Parapet Wall Support
City Review & Approve - Parapet Wall Support
Revise & Resubmit - Parapet Wall Support
City Review & Approve Rev01 - Parapet Wall Support
Procure Material - Parapet Wall Support
Develop & Submit - Exterior Curtain Wall
McCarthy Review & Approve - Exterior Curtain Wall
A/E Review & Approve - Exterior Curtain Wall
City Review & Approve - Exterior Curtain Wall
Revise & Resubmit - Exterior Curtain Wall
City Review & Approve Rev01 - Exterior Curtain Wall
Drawing Revisions - Exterior Curtain Wall
Fabricate & Deliver - Aluminum Framing Curtain Wall
Fabricate & Deliver - Glazing Curtain Wall
Develop & Submit - Exterior Storefront
McCarthy Review & Approve - Exterior Storefront
A/E Review & Approve - Exterior Storefront
City Review & Approve - Exterior Storefront
Revise & Resubmit - Exterior Storefront
City Review & Approve Rev01 - Exterior Storefront
Drawing Revisions - Exterior Storefront
Fabricate & Deliver - Aluminum Framing Storefront
Fabricate & Deliver - Storefront Doors / Automatic Sliding Doors Fabricate & Deliver - Glazing Storefront
Develop & Submit - Glass Guardrail
McCarthy Review & Approve - Glass Guardrail
A/E Review & Approve - Glass Guardrail
City Review & Approve - Glass Guardrail
Revise & Resubmit - Glass Guardrail
City Review & Approve Rev01 - Glass Guardrail
Drawing Revisions - Glass Guardrail
Fabricate & Deliver - Glass Guardrail
Develop & Submit - Suspended Ceiling & Suspended Elements McCarthy Review & Approve - Suspended Ceiling & Suspended Elements A/E Review & Approve - Suspended Ceiling & Suspended Elements City Review & Approve - Suspended Ceiling & Suspended Elements Revise & Resubmit - Suspended Ceiling & Suspended Elements City Review & Approve Rev01 - Suspended Ceiling & Suspended Elements Procure Material - Suspended Ceiling & Suspended Elements Develop & Submit - Driving Range Poles (Owner)
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 4 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 124 of 259 ends
Page 46 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
DA1800 City Review & Approve - Driving Range Poles 7 Dec-13-22 Dec-21-22 78 DA1990 Process Drawings / Release Poles - Driving Range Poles 2 Dec-22-22 Dec-23-22 78 DA1830 Fabricate & Deliver - Driving Range Poles (Calendar Days) (Owner) 90 Dec-24-22 Mar-23-23 112 Submittals / Material ProcurementSubmittals / Material Procurement 239 Oct-31-22 Oct-10-23 21 Division 03Division 03 198 Nov-01-22 Aug-14-23 48
Concrete ReinforcementConcrete Reinforcement 21 Nov-01-22 Dec-02-22 18 SUB-3610 Submittal Prep - Concrete Reinforcement 5 Nov-01-22 Nov-07-22 18 SUB-7620 McC Review / Submit - Concrete Reinforcement 1 Nov-08-22 Nov-08-22 18 SUB-3630 A/E Review / Approve - Concrete Reinforcement 10 Nov-09-22 Nov-23-22 18 SUB-7640 Fab / Deliver - Concrete Reinforcement 5 Nov-28-22 Dec-02-22 18 Cast In Place ConcreteCast In Place Concrete 17 Nov-01-22 Nov-28-22 30 SUB-3650 Submittal Prep - Concrete Mix Designs 5 Nov-01-22 Nov-07-22 30 SUB-7660 McC Review / Submit - Concrete Mix Designs 2 Nov-08-22 Nov-09-22 30 SUB-3670 A/E Review / Approve - Concrete Mix Designs 10 Nov-10-22 Nov-28-22 30 Precast Concrete TreadsPrecast Concrete Treads 172 Dec-12-22 Aug-14-23 48 SUB-9970 Submittal Prep - Precast Concrete Treads 10 Dec-12-22 Dec-23-22 138 SUB-9980 McC Review / Submit - Precast Concrete Treads 2 Dec-27-22 Dec-28-22 138 SUB-9990 A/E Review / Approve - Precast Concrete Treads 10 Dec-29-22 Jan-12-23 138 SUB-10000 Fab / Deliver - Precast Concrete Treads 60 May-19-23 Aug-14-23 48 Polished Concrete Protection (SKUDO HT)Polished Concrete Protection (SKUDO HT) 62 Dec-12-22 Mar-09-23 44 SUB-10010 Submittal Prep - Polished Concrete Protection (SKUDO HT) 10 Dec-12-22 Dec-23-22 44 SUB-10020 McC Review / Submit - Polished Concrete Protection (SKUDO HT) 2 Dec-27-22 Dec-28-22 44 SUB-10030 A/E Review / Approve - Polished Concrete Protection (SKUDO HT) 10 Dec-29-22 Jan-12-23 44 SUB-10040 Fab / Deliver - Polished Concrete Protection (SKUDO HT) 40 Jan-13-23 Mar-09-23 44 Division 05Division 05 80 Nov-07-22 Mar-03-23 94
Anchor Bolts & EmbedsAnchor Bolts & Embeds 23 Nov-07-22 Dec-12-22 10 SUB-5700 Submittal Prep - Anchor Bolts & Embeds 5 Nov-07-22 Nov-14-22 10 SUB-5710 McC Review / Submit - Anchor Bolts & Embeds 1 Nov-15-22 Nov-15-22 10 SUB-5720 A/E Review / Approve - Anchor Bolts & Embeds 10 Nov-16-22 Dec-01-22 10 SUB-5730 Fab / Deliver - Anchor Bolts & Embeds 7 Dec-02-22 Dec-12-22 10 Structural SteelStructural Steel 70 Nov-07-22 Feb-17-23 7 North (U to K) SequenceNorth (U to K) Sequence 70 Nov-07-22 Feb-17-23 0 SUB-7690 Submittal Prep - Structural Steel - North Sequence (U to K) 10 Nov-07-22 Nov-21-22 48 SUB-3720 Fab / Deliver - Structural Steel - North Sequence (U to K) 70 Nov-07-22 Feb-17-23 0 SUB-3700 McC Review / Submit - Structural Steel - North Sequence (U to K) 1 Nov-22-22 Nov-22-22 49 SUB-7710 A/E Review / Approve - Structural Steel - North Sequence (U to K) 10 Nov-23-22 Dec-08-22 49 South (K to A) SequenceSouth (K to A) Sequence 70 Nov-07-22 Feb-17-23 7 SUB-6260 Fab / Deliver - Structural Steel - South Sequence (K to A) 70 Nov-07-22 Feb-17-23 7 SUB-6220 Submittal Prep - Structural Steel - South Sequence (K to A) 10 Nov-10-22 Nov-28-22 48 SUB-6230 McC Review / Submit - Structural Steel - South Sequence (K to A) 1 Nov-29-22 Nov-29-22 48 SUB-6240 A/E Review / Approve - Structural Steel - South Sequence (K to A) 10 Nov-30-22 Dec-13-22 48 SUB-6250 Make Corrections to Shop Drawings - Structural Steel - South Sequence (K to A)5 Dec-14-22 Dec-20-22 48 Metal DeckingMetal Decking 80 Nov-07-22 Mar-03-23 24
SUB-8990 Submittal Prep - Metal Decking 10 Nov-07-22 Nov-21-22 47 SUB-7000 McC Review / Submit - Metal Decking 5 Nov-22-22 Nov-30-22 47 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
City Review & Approve - Driving Range Poles
Process Drawings / Release Poles - Driving Range Poles
Fabricate & Deliver - Driving Range Poles (Calendar Days) (Owner) Submittal Prep - Concrete Reinforcement
McC Review / Submit - Concrete Reinforcement
A/E Review / Approve - Concrete Reinforcement
Fab / Deliver - Concrete Reinforcement
Submittal Prep - Concrete Mix Designs
McC Review / Submit - Concrete Mix Designs
A/E Review / Approve - Concrete Mix Designs
Submittal Prep - Precast Concrete Treads
McC Review / Submit - Precast Concrete Treads
A/E Review / Approve - Precast Concrete Treads
Fab / Deliver - Precast Concrete Treads
Submittal Prep - Polished Concrete Protection (SKUDO HT) McC Review / Submit - Polished Concrete Protection (SKUDO HT) A/E Review / Approve - Polished Concrete Protection (SKUDO HT) Fab / Deliver - Polished Concrete Protection (SKUDO HT) Submittal Prep - Anchor Bolts & Embeds
McC Review / Submit - Anchor Bolts & Embeds
A/E Review / Approve - Anchor Bolts & Embeds
Fab / Deliver - Anchor Bolts & Embeds
Submittal Prep - Structural Steel - North Sequence (U to K) Fab / Deliver - Structural Steel - North Sequence (U to K) McC Review / Submit - Structural Steel - North Sequence (U to K) A/E Review / Approve - Structural Steel - North Sequence (U to K) Fab / Deliver - Structural Steel - South Sequence (K to A) Submittal Prep - Structural Steel - South Sequence (K to A) McC Review / Submit - Structural Steel - South Sequence (K to A) A/E Review / Approve - Structural Steel - South Sequence (K to A) Make Corrections to Shop Drawings - Structural Steel - South Sequence (K to A) Submittal Prep - Metal Decking
McC Review / Submit - Metal Decking
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 5 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 125 of 259 ends
Page 47 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
SUB-9010 A/E Review / Approve - Metal Decking 10 Dec-01-22 Dec-14-22 47 SUB-9640 Fab / Deliver - North Sequence Metal Decking 25 Jan-19-23 Feb-22-23 24 SUB-7020 Fab / Deliver - South Sequence Metal Decking 25 Jan-30-23 Mar-03-23 24 Metal StairsMetal Stairs 58 Nov-29-22 Feb-20-23 103
SUB-9030 Submittal Prep - Metal Stairs 2 & 3 25 Nov-29-22 Jan-04-23 103 SUB-7040 McC Review / Submit - Metal Stairs 2 & 3 3 Jan-05-23 Jan-09-23 103 SUB-9050 A/E Review / Approve - Metal Stairs 2 & 3 10 Jan-10-23 Jan-23-23 103 SUB-7060 Fab / Deliver - Metal Stairs 2 & 3 20 Jan-24-23 Feb-20-23 103 Division 06Division 06 212 Dec-12-22 Oct-10-23 0
Architectural WoodworkArchitectural Woodwork 103 Dec-12-22 May-05-23 86 SUB-4040 Submittal Prep - Architectural Woodwork 30 Dec-12-22 Jan-24-23 86 SUB-4050 McC Review / Submit - Architectural Woodwork 3 Jan-25-23 Jan-27-23 86 SUB-4060 A/E Review / Approve - Architectural Woodwork 10 Jan-30-23 Feb-10-23 86 SUB-4070 Fab / Deliver - Architectural Woodwork 60 Feb-13-23 May-05-23 86 Granite CountertopsGranite Countertops 48 Dec-12-22 Feb-17-23 124 SUB-4080 Submittal Prep - Granite Countertops 15 Dec-12-22 Jan-03-23 124 SUB-4090 McC Review / Submit - Granite Countertops 3 Jan-04-23 Jan-06-23 124 SUB-4100 A/E Review / Approve - Granite Countertops 10 Jan-09-23 Jan-20-23 124 SUB- 4110 Fab / Deliver - Granite Countertops 20 Jan-23-23 Feb-17-23 124 Restroom CountertopsRestroom Countertops 212 Dec-12-22 Oct-10-23 0 SUB-7090 Submittal Prep - Restroom Countertops 15 Dec-12-22 Jan-03-23 174 SUB-7100 McC Review / Submit - Restroom Countertops 3 Jan-04-23 Jan-06-23 174 SUB- 7110 A/E Review / Approve - Restroom Countertops 10 Jan-09-23 Jan-20-23 174 SUB-7120 Fab / Deliver - Restrooms Countertops 10 Sep-27-23 Oct-10-23 0 Division 07Division 07 115 Nov-09-22 Apr-25-23 53
Waterpro ofingWaterpro ofing 18 Nov-09-22 Dec-07-22 38
SUB-3570 Submittal Prep - Waterproofing 5 Nov-09-22 Nov-16-22 38 SUB-7580 McC Review / Submit - Waterproofing 1 Nov-17-22 Nov-17-22 38 SUB-3590 A/E Review / Approve - Waterproofing 10 Nov-18-22 Dec-05-22 38 SUB-7600 Fab / Deliver - Waterproofing 2 Dec-06-22 Dec-07-22 38 Exterior Insulation and Finish Systems (EIFS)Exterior Insulation and Finish Systems (EIFS) 50 Dec-12-22 Feb-21-23 88 SUB-7490 Submittal Prep - EIFS 20 Dec-12-22 Jan-10-23 88 SUB-7500 McC Review / Submit - EIFS 5 Jan-11-23 Jan-17-23 88 SUB-7510 A/E Review / Approve - EIFS 10 Jan-18-23 Jan-31-23 88 SUB-7520 Fab / Deliver - EIFS 15 Feb-01-23 Feb-21-23 88 Exterior Composite Aluminum Wall PanelsExterior Composite Aluminum Wall Panels 95 Dec-12-22 Apr-25-23 53 SUB-4120 Submittal Prep - Exterior Composite Aluminum Wall Panels 20 Dec-12-22 Jan-10-23 53 SUB-4130 McC Review / Submit - Exterior Composite Aluminum Wall Panels 5 Jan-11-23 Jan-17-23 53 SUB-4140 A/E Review / Approve - Exterior Composite Aluminum Wall Panels 10 Jan-18-23 Jan-31-23 53 SUB-4150 Fab / Deliver - Exterior Composite Aluminum Wall Panels 60 Feb-01-23 Apr-25-23 53 Thermoplastic Membrane RoofingThermoplastic Membrane Roofing 81 Dec-12-22 Apr-05-23 37 SUB-3530 Submittal Prep - Thermoplastic Membrane Roofing 20 Dec-12-22 Jan-10-23 37 SUB-7540 McC Review / Submit - Thermoplastic Membrane Roofing 1 Jan-11-23 Jan-11-23 37 SUB-3550 A/E Review / Approve - Thermoplastic Membrane Roofing 10 Jan-12-23 Jan-25-23 37 SUB-7560 Fab / Deliver - Thermoplastic Membrane Roofing 50 Jan-26-23 Apr-05-23 37 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
A/E Review / Approve - Metal Decking
Fab / Deliver - North Sequence Metal Decking
Fab / Deliver - South Sequence Metal Decking
Submittal Prep - Metal Stairs 2 & 3
McC Review / Submit - Metal Stairs 2 & 3
A/E Review / Approve - Metal Stairs 2 & 3
Fab / Deliver - Metal Stairs 2 & 3
Submittal Prep - Architectural Woodwork
McC Review / Submit - Architectural Woodwork
A/E Review / Approve - Architectural Woodwork
Fab / Deliver - Architectural Woodwork
Submittal Prep - Granite Countertops
McC Review / Submit - Granite Countertops
A/E Review / Approve - Granite Countertops
Fab / Deliver - Granite Countertops
Submittal Prep - Restroom Countertops
McC Review / Submit - Restroom Countertops
A/E Review / Approve - Restroom Countertops
Fab / Deliver - Restrooms Countertops
Submittal Prep - Waterproofing
McC Review / Submit - Waterproofi ng
A/E Review / Approve - Waterproofing
Fab / Deliver - Waterproofing
Submittal Prep - EIFS
McC Review / Submit - EIFS
A/E Review / Approve - EIFS
Fab / Deliver - EIFS
Submittal Prep - Exterior Composite Aluminum Wall Panels McC Review / Submit - Exterior Composite Aluminum Wall Panels A/E Review / Approve - Exterior Composite Aluminum Wall Panels Fab / Deliver - Exterior Composite Aluminum Wall Panels Submittal Prep - Thermoplastic Membrane Roofing
McC Review / Submit - Thermoplastic Membrane Roofing
A/E Review / Approve - Thermoplastic Membrane Roofing
Fab / Deliver - Thermoplastic Membrane Roofing
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 6 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 126 of 259 ends
Page 48 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
Division 08Division 08 135 Dec-12-22 Jun-21-23 75
Hollow Metal Doors & FramesHollow Metal Doors & Frames 75 Dec-12-22 Mar-28-23 60 SUB-4160 Submittal Prep - Hollow Metal Doors & Frames 20 Dec-12-22 Jan-10-23 60 SUB-4170 McC Review / Submit - Hollow Metal Doors & Frames 5 Jan-11-23 Jan-17-23 60 SUB-4180 A/E Review / Approve - Hollow Metal Doors & Frames 10 Jan-18-23 Jan-31-23 60 SUB-4200 Fab / Deliver - Hollow Metal Door Frames 40 Feb-01-23 Mar-28-23 60 Door HardwareDoor Hardware 75 Dec-12-22 Mar-28-23 83
SUB-4210 Submittal Prep - Door Hardware 20 Dec-12-22 Jan-10-23 83 SUB-4220 McC Review / Submit - Door Hardware 5 Jan-11-23 Jan-17-23 83 SUB-4230 A/E Review / Approve - Door Hardware 10 Jan-18-23 Jan-31-23 83 SUB-4240 Fab / Deliver - Door Hardware 40 Feb-01-23 Mar-28-23 83 Roll-up DoorsRoll-up Doors 65 Dec-12-22 Mar-14-23 133
SUB-3370 Submittal Prep - Roll-up Door 20 Dec-12-22 Jan-10-23 133 SUB-3380 McC Review / Submit - Roll-up Door 5 Jan-11-23 Jan-17-23 133 SUB-3390 A/E Review / Approve - Roll-up Door 10 Jan-18-23 Jan-31-23 133 SUB-3400 Fab / Deliver - Roll-up Door 30 Feb-01-23 Mar-14-23 133 Operable PartitionOperable Partition 135 Dec-12-22 Jun-21-23 70 SUB-3450 Submittal Prep - Operable Partitions 20 Dec-12-22 Jan-10-23 70 SUB-3460 McC Review / Submit - Operable Partitions 5 Jan-11-23 Jan-17-23 70 SUB-3470 A/E Review / Approve - Operable Partitions 10 Jan-18-23 Jan-31-23 70 SUB-3480 Fab / Deliver - Operable Partitions 100 Feb-01-23 Jun-21-23 70 Smoke CurtainSmoke Curtain 115 Dec-12-22 May-23-23 95
SUB-9600 Submittal Prep - Smoke Curtain 20 Dec-12-22 Jan-10-23 95 SUB-9610 McC Review / Submit - Smoke Curtain 5 Jan-11-23 Jan-17-23 95 SUB-9620 A/E Review / Approve - Smoke Curtain 10 Jan-18-23 Jan-31-23 95 SUB-9630 Fab / Deliver - Smoke Curtain 80 Feb-01-23 May-23-23 95 Division 09Division 09 75 Dec-12-22 Mar-28-23 100
TilingTiling 75 Dec-12-22 Mar-28-23 100
SUB-4250 Submittal Prep - Tiling 20 Dec-12-22 Jan-10-23 100 SUB-4260 McC Review / Submit - Tiling 5 Jan-11-23 Jan-17-23 100 SUB-4270 A/E Review / Approve - Tiling 10 Jan-18-23 Jan-31-23 100 SUB-4280 Fab / Deliver - Tiling 40 Feb-01-23 Mar-28-23 100 Resinous FlooringResinous Flooring 65 Dec-12-22 Mar-14-23 94 SUB-4290 Submittal Prep - Resinous Flooring 20 Dec-12-22 Jan-10-23 94 SUB-4300 McC Review / Submit - Resinous Flooring 5 Jan-11-23 Jan-17-23 94 SUB-4310 A/E Review / Approve - Resinous Flooring 10 Jan-18-23 Jan-31-23 94 SUB-4320 Fab / Deliver - Resinous Flooring 30 Feb-01-23 Mar-14-23 94 Division 10Division 10 51 Dec-12-22 Feb-22-23 164
SignageSignage 51 Dec-12-22 Feb-22-23 164
SUB-10050 Submittal Prep - Signage 10 Dec-12-22 Dec-23-22 164 SUB-10060 McC Review / Submit - Signage 1 Dec-27-22 Dec-27-22 164 SUB-10070 A/E Review / Approve - Signage 10 Dec-28-22 Jan-11-23 164 SUB-10080 Fab / Deliver - Signage 30 Jan-12-23 Feb-22-23 164 Division 11Division 11 115 Dec-12-22 May-23-23 60
Kitchen HoodKitchen Hood 115 Dec-12-22 May-23-23 60
Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Submittal Prep - Hollow Metal Doors & Frames
McC Review / Submit - Hollow Metal Doors & Frames
A/E Review / Approve - Hollow Metal Doors & Frames
Fab / Deliver - Hollow Metal Door Frames
Submittal Prep - Door Hardware
McC Review / Submit - Door Hardware
A/E Review / Approve - Door Hardware
Fab / Deliver - Door Hardware
Submittal Prep - Roll-up Door
McC Review / Submit - Roll-up Door
A/E Review / Approve - Roll-up Door
Fab / Deliver - Roll-up Door
Submittal Prep - Operable Partitions
McC Review / Submit - Operable Partitions
A/E Review / Approve - Operable Partitions
Fab / Deliver - Operable Partitions
Submittal Prep - Smoke Curtain
McC Review / Submit - Smoke Curtain
A/E Review / Approve - Smoke Curtain
Fab / Deliver - Smoke Curtain
Submittal Prep - Tiling
McC Review / Submit - Tiling
A/E Review / Approve - Tiling
Fab / Deliver - Tiling
Submittal Prep - Resinous Flooring
McC Review / Submit - Resinous Flooring
A/E Review / Approve - Resinous Flooring
Fab / Deliver - Resinous Flooring
Submittal Prep - Signage
McC Review / Submit - Signage
A/E Review / Approve - Signage
Fab / Deliver - Signage
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 7 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 127 of 259 ends
Page 49 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
SUB-9520 Submittal Prep - Kitchen Hood 20 Dec-12-22 Jan-10-23 60 SUB-9537 McC Review / Submit - Kitchen Hood 5 Jan-11-23 Jan-17-23 60 SUB-9540 A/E Review / Approve - Kitchen Hood 10 Jan-18-23 Jan-31-23 60 SUB-9550 Fab / Deliver - Kitchen Hood 80 Feb-01-23 May-23-23 60 Division 22Division 22 114 Nov-01-22 Apr-14-23 122
Domestic Water SoftnersDomestic Water Softners 105 Nov-01-22 Apr-03-23 123 SUB-4330 Submittal Prep - Domestic Water Softeners 32 Nov-01-22 Dec-19-22 123 SUB-4340 McC Review / Submit - Domestic Water Softeners 3 Dec-20-22 Dec-22-22 123 SUB-4350 A/E Review / Approve - Domestic Water Softeners 10 Dec-23-22 Jan-09-23 123 SUB-4360 Fab / Deliver - Domestic Water Softeners 60 Jan-10-23 Apr-03-23 123 Domestic Water HeatersDomestic Water Heaters 90 Nov-01-22 Mar-13-23 138 SUB-4370 Submittal Prep - Domestic Water Heaters 32 Nov-01-22 Dec-19-22 138 SUB-4380 McC Review / Submit - Domestic Water Heaters 3 Dec-20-22 Dec-22-22 138 SUB-4390 A/E Review / Approve - Domestic Water Heaters 10 Dec-23-22 Jan-09-23 138 SUB-4400 Fab / Deliver - Domestic Water Heaters 45 Jan-10-23 Mar-13-23 138 Plumbing FixturesPlumbing Fixtures 114 Nov-01-22 Apr-14-23 122 SUB-4410 Submittal Prep - Plumbing Fixtures 41 Nov-01-22 Jan-03-23 122 SUB-4420 McC Review / Submit - Plumbing Fixtures 3 Jan-04-23 Jan-06-23 122 SUB-4430 A/E Review / Approve - Plumbing Fixtures 10 Jan-09-23 Jan-20-23 122 SUB-4440 Fab / Deliver - Plumbing Fixtures 60 Jan-23-23 Apr-14-23 122 Division 23Division 23 216 Nov-09-22 Sep-18-23 37
Air-Handling UnitsAir-Handling Units 216 Nov-09-22 Sep-18-23 0 SUB-7770 Submittal Prep - Air-Handling Units 5 Nov-09-22 Nov-16-22 0 SUB-3780 McC Review / Submit - Air-Handling Units 1 Nov-17-22 Nov-17-22 0 SUB-7790 A/E Review / Approve - Air-Handling Units 10 Nov-18-22 Dec-05-22 0 SUB-3800 Fab / Deliver - Air-Handling Units 200 Dec-06-22 Sep-18-23 0 Split System Air Con dition ersSplit System Air Con dition ers 116 Nov-09-22 Apr-26-23 137 SUB-4450 Submittal Prep - Split System Air Conditioners 25 Nov-09-22 Dec-16-22 137 SUB-4460 McC Review / Submit - Split System Air Conditioners 1 Dec-19-22 Dec-19-22 137 SUB-4470 A/E Review / Approve - Split System Air Conditioners 10 Dec-20-22 Jan-04-23 137 SUB-4480 Fab / Deliver - Split System Air Conditioners 80 Jan-05-23 Apr-26-23 137 Division 26Division 26 178 Nov-01-22 Jul-17-23 40
Low-V oltage TransformersLow-V oltage Transformers 122 Nov-01-22 Apr-26-23 59 SUB-4490 Submittal Prep - Low-Voltage Transformers 10 Nov-01-22 Nov-15-22 59 SUB-4500 McC Review / Submit - Low-Voltage Transformers 2 Nov-16-22 Nov-17-22 59 SUB-4510 A/E Review / Approve - Low-Voltage Transformers 10 Nov-18-22 Dec-05-22 59 SUB-4520 Fab / Deliver - Low-Voltage Transformers 100 Dec-06-22 Apr-26-23 59 PanelboardsPanelboards 125 Dec-12-22 Jun-07-23 28
SUB-3820 Submittal Prep - Electrical Panels 10 Dec-12-22 Dec-23-22 28 SUB-3830 McC Review / Submit - Electrical Panels 5 Dec-27-22 Jan-03-23 28 SUB-3840 A/E Review / Approve - Electrical Panels 10 Jan-04-23 Jan-17-23 28 SUB-3850 Fab / Deliver - Electrical Panels 100 Jan-18-23 Jun-07-23 28 Enclosed Switches and Circuit BreakersEnclosed Switches and Circuit Breakers 178 Nov-01-22 Jul-17-23 3 SUB-7730 Submittal Prep - Electrical Switch Gear 15 Nov-01-22 Nov-22-22 3 SUB-3740 McC Review / Submit - Electrical Switch Gear 1 Nov-23-22 Nov-23-22 3 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Submittal Prep - Kitchen Hood
McC Review / Submit - Kitchen Hood
A/E Review / Approve - Kitchen Hood
Fab / Deliver - Kitchen Hood
Submittal Prep - Domestic Water Softeners
McC Review / Submit - Domestic Water Softeners
A/E Review / Approve - Domestic Water Softeners
Fab / Deliver - Domestic Water Softeners
Submittal Prep - Domestic Water Heaters
McC Review / Submit - Domestic Water Heaters
A/E Review / Approve - Domestic Water Heaters
Fab / Deliver - Domestic Water Heaters
Submittal Prep - Plumbing Fixtures
McC Review / Submit - Plumbing Fixtures
A/E Review / Approve - Plumbing Fixtures
Fab / Deliver - Plumbing Fixtures
Submittal Prep - Air-Handling Units
McC Review / Submit - Air-Handling Units
A/E Review / Approve - Air-Handling Units
Fab / Deliver - Air-Handling Units
Submittal Prep - Split System Air Conditioners
McC Review / Submit - Split System Air Conditioners
A/E Review / Approve - Split System Air Conditioners
Fab / Deliver - Split System Air Conditioners
Submittal Prep - Low-Voltage Transformers
McC Review / Submit - Low-Voltage Transformers
A/E Review / Approve - Low-Voltage Transformers
Fab / Deliver - Low-Voltage Transformers
Submittal Prep - Electrical Panels
McC Review / Submit - Electrical Panels
A/E Review / Approve - Electrical Panels
Fab / Deliver - Electrical Panels
Submittal Prep - Electrical Switch Gear
McC Review / Submit - Electrical Switch Gear
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 8 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 128 of 259 ends
Page 50 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
SUB-7750 A/E Review / Approve - Electrical Switch Gear 10 Nov-28-22 Dec-09-22 3 SUB-3760 Fab - Electrical Switch Gear (Eaton) 150 Dec-12-22 Jul-13-23 3 SUB-9650 Deliver - Electrical Switch Gear (Eaton) 2 Jul-14-23 Jul-17-23 3 Interior LightingInterior Lighting 115 Dec-12-22 May-23-23 77 SUB-4530 Submittal Prep - Interior Lighting 20 Dec-12-22 Jan-10-23 77 SUB-4540 McC Review / Submit - Interior Lighting 5 Jan-11-23 Jan-17-23 77 SUB-4550 A/E Review / Approve - Interior Lighting 10 Jan-18-23 Jan-31-23 77 SUB-4560 Fab / Deliver - Interior Lighting 80 Feb-01-23 May-23-23 77 Division 28Division 28 95 Dec-12-22 Apr-25-23 64
Fire A lar m Syste mFire A lar m Syste m 95 Dec-12-22 Apr-25-23 64 SUB-3410 Submittal Prep - Fire Alarm System 23 Dec-12-22 Jan-13-23 64 SUB-3420 McC Review / Submit - Fire Alarm System 2 Jan-16-23 Jan-17-23 64 SUB-3430 A/E Review / Approve - Fire Alarm System 10 Jan-18-23 Jan-31-23 64 SUB-3490 Fab / Deliver - Fire Alarm System 60 Feb-01-23 Apr-25-23 64 Division 33Division 33 117 Oct-31-22 Apr-18-23 75
Grease InterceptorGrease Interceptor 89 Oct-31-22 Mar-09-23 24 SUB-9070 Submittal Prep - Grease Interceptor 15 Oct-31-22 Nov-21-22 24 SUB-7080 McC Review / Submit - Grease Interceptor 4 Nov-22-22 Nov-29-22 24 SUB-9090 A/E Review / Approve - Grease Interceptor 10 Nov-30-22 Dec-13-22 24 SUB-9106 Fab / Deliver - Grease Interceptor 60 Dec-14-22 Mar-09-23 24 Contech Infiltration / Retention BasinContech Infiltration / Retention Basin 97 Oct-31-22 Mar-21-23 48 SUB-9560 Submittal Prep - Contech Infiltration / Retention Basin 20 Oct-31-22 Nov-30-22 48 SUB-9570 McC Review / Submit - Contech Infiltration / Retention Basin 2 Dec-01-22 Dec-02-22 48 SUB-9580 A/E Review / Approve - Contech Infiltration / Retention Basin 10 Dec-05-22 Dec-16-22 48 SUB-9590 Fab - Contech Infiltration / Retention Basin 60 Dec-19-22 Mar-14-23 48 SUB-9660 Deliver - Contech Infiltration / Retention Basin 5 Mar-15-23 Mar-21-23 48 Jensen Target VaultsJensen Target Vaults 117 Oct-31-22 Apr-18-23 6 SUB-9670 Submittal Prep - Jensen Target Vault 20 Oct-31-22 Nov-30-22 6 SUB-9680 McC Review / Submit - Jensen Target Vault 2 Dec-01-22 Dec-02-22 6 SUB-9690 A/E Review / Approve - Jensen Target Vault 10 Dec-05-22 Dec-16-22 6 SUB-9700 Fab - Jensen Target Vault 80 Dec-19-22 Apr-11-23 6 SUB-9710 Deliver - Jensen Target Vault 5 Apr-12-23 Apr-18-23 6 Jensen Lift StationsJensen Lift Stations 117 Oct-31-22 Apr-18-23 40 SUB-9720 Submittal Prep - Jensen Lift Station 20 Oct-31-22 Nov-30-22 40 SUB-9730 McC Review / Submit - Jensen Lift Station 2 Dec-01-22 Dec-02-22 40 SUB-9740 A/E Review / Approve - Jensen Lift Station 10 Dec-05-22 Dec-16-22 40 SUB-9750 Fab - Jensen Lift Station 80 Dec-19-22 Apr-11-23 40 SUB-9760 Deliver - Jensen Lift Station 5 Apr-12-23 Apr-18-23 40 Biofiltration SystemBiofiltration System 107 Oct-31-22 Apr-04-23 47 SUB-9770 Submittal Prep - Biofiltration System 20 Oct-31-22 Nov-30-22 47 SUB-9780 McC Review / Submit - Biofiltration System 2 Dec-01-22 Dec-02-22 47 SUB-9790 A/E Review / Approve - Biofiltration System 10 Dec-05-22 Dec-16-22 47 SUB-9800 Fab - Biofiltration System 70 Dec-19-22 Mar-28-23 47 SUB-9810 Deliver - Biofiltration System 5 Mar-29-23 Apr-04-23 47 CMP Detention PipingCMP Detention Piping 97 Oct-31-22 Mar-21-23 48 SUB-9820 Submittal Prep - CMP Detention Piping 20 Oct-31-22 Nov-30-22 48 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
A/E Review / Approve - Electrical Switch Gear
Fab - Electrical Switch Gear (Eaton)
Deliver - Electrical Switch Gear (Eaton)
Submittal Prep - Interior Lighting
McC Review / Submit - Interior Lighting
A/E Review / Approve - Interior Lighting
Fab / Deliver - Interior Lighting
Submittal Prep - Fire Alarm System
McC Review / Submit - Fire Alarm System
A/E Review / Approve - Fire Alarm System
Fab / Deliver - Fire Alarm System
Submittal Prep - Grease Interceptor
McC Review / Submit - Grease Interceptor
A/E Review / Approve - Grease Interceptor
Fab / Deliver - Grease Interceptor
Submittal Prep - Contech Infiltration / Retention Basin McC Review / Submit - Contech Infiltration / Retention Basin A/E Review / Approve - Contech Infiltration / Retention Basin Fab - Contech Infiltration / Retention Basin
Deliver - Contech Infiltration / Retention Basin
Submittal Prep - Jensen Target Vault
McC Review / Submit - Jensen Target Vault
A/E Review / Approve - Jensen Target Vault
Fab - Jensen Target Vault
Deliver - Jensen Target Vault
Submittal Prep - Jensen Lift Station
McC Review / Submit - Jensen Lift Station
A/E Review / Approve - Jensen Lift Station
Fab - Jensen Lift Station
Deliver - Jensen Lift Station
Submittal Prep - Biofiltration System
McC Review / Submit - Biofiltration System
A/E Review / Approve - Biofiltration System
Fab - Biofiltration System
Deliver - Biofiltration System
Submittal Prep - CMP Detention Piping
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 9 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 129 of 259 ends
Page 51 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
SUB-9830 McC Review / Submit - CMP Detention Piping 2 Dec-01-22 Dec-02-22 48 SUB-9840 A/E Review / Approve - CMP Detention Piping 10 Dec-05-22 Dec-16-22 48 SUB-9850 Fab - CMP Detention Piping 60 Dec-19-22 Mar-14-23 48 SUB-9860 Deliver - CMP Detention Piping 5 Mar-15-23 Mar-21-23 48 Nyloplast BasinsNyloplast Basins 61 Oct-31-22 Jan-30-23 42 SUB-9870 Submittal Prep - Nyloplast Basins 5 Oct-31-22 Nov-04-22 42 SUB-9880 McC Review / Submit - Nyloplast Basins 1 Nov-07-22 Nov-07-22 42 SUB-9890 A/E Review / Approve - Nyloplast Basins 10 Nov-08-22 Nov-22-22 42 SUB-9900 Fab - Nyloplast Basins 40 Nov-23-22 Jan-23-23 42 SUB-9910 Deliver - Nyloplast Basins 5 Jan-24-23 Jan-30-23 42 Domestic Water VaultDomestic Water Vault 97 Oct-31-22 Mar-21-23 95 SUB-9920 Submittal Prep - Domestic Water Vault 20 Oct-31-22 Nov-30-22 95 SUB-9930 McC Review / Submit - Domestic Water Vault 2 Dec-01-22 Dec-02-22 95 SUB-9940 A/E Review / Approve - Domestic Water Vault 10 Dec-05-22 Dec-16-22 95 SUB-9950 Fab - Domestic Water Vault 60 Dec-19-22 Mar-14-23 95 SUB-9960 Deliver - Domestic Water Vault 5 Mar-15-23 Mar-21-23 95 Owner DeliverablesOwner Deliverables 261 Sep-26-22 Oct-05-23 5 OFCI-2120 Deliver OFCI Power Systems (By Owner) 0 Sep-26-22 257 OFCI-1630 Deliver Kitchen Equipment OFOI (By Owner) 0 Sep-26-22 253 OFCI-17210 Deliv er W al k- In Cool er / F r ee zer O FO I (By Ow ne r )0 Sep-26-22 237 OFCI-1680 Deliver Targets OFCI (By Owner) 0 Feb-17-23 88 OFCI-1670 Deliver Poles / Netting OFOI (By Owner) 0 Mar-23-23 78 OFCI-1650 Deliver Hitting Bay Equipment OFOI (By Owner) 0 Sep-06-23 17 OFCI-2110 Deliver OFCI Lighting (By Owner) 0 Sep-19-23 3 OFCI-1660 Deliver OFOI Turf (By Owner) 0 Sep-28-23 6
OFCI-1640 Deliver Bar Equipment OFOI (By Owner) 0 Oct-05-23 5 Mock-UpsMock-Ups 37 Dec-28-22 Feb-17-23 73
ConcreteConcrete 15 Dec-28-22 Jan-18-23 16
MU-3870 Form / Rebar / Pour Concrete Mock-Up 5 Dec-28-22 Jan-04-23 16 MU-3880 A/E Review & Approve Concrete Mock-Up 10 Jan-05-23 Jan-18-23 16 Exterior EnclosureExterior Enclosure 35 Dec-30-22 Feb-17-23 73 MU-3920 Frame Exterior Walls - Buildi ng Enclosure Mock-Up 5 Dec-30-22 Jan-06-23 73 MU-3930 Exterior Sheathing - Building Enclosure Mock-Up 3 Jan-09-23 Jan-11-23 73 MU-3940 Install Flashing - Building Enclosure Mock-Up 4 Jan-12-23 Jan-17-23 73 MU-3950 Air & Wa ter Bar r i er - B ui ld ing Enc lo s ur e Mo ck - Up3 Jan-18-23 Jan-20-23 73 MU-3960 EIFS System - Building Enclosure Mock-Up 5 Jan-23-23 Jan-27-23 73 MU-3970 Composite Metal Panels - Building Enclosure Mock-Up 5 Jan-30-23 Feb-03-23 73 MU-3980 Rain Screen System - Building Enclosure Mock-Up 5 Jan-30-23 Feb-03-23 73 MU-3990 Storefront / Curtainwall System - Building Enclosure Mock-Up 5 Jan-30-23 Feb-03-23 73 MU-3910 A/E Review & Approve Building Enclosure Mock-Up 10 Feb-06-23 Feb-17-23 73 ConstructionConstruction 269 Nov-14-22 Dec-07-23 15
Site MobilizationSite Mobilization 20 Nov-14-22 Dec-13-22 223 SM-1060 Install SWPPPs / BMP's 3 Nov-14-22 Nov-16-22 13 SM-1080 Install Construction Fence / Signage / Restrooms / Handwash Stations 5 Nov-14-22 Nov-18-22 16 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
McC Review / Submit - CMP Detention Piping
A/E Review / Approve - CMP Detention Piping
Fab - CMP Detention Piping
Deliver - CMP Detention Piping
Submittal Prep - Nyloplast Basins
McC Review / Submit - Nyloplast Basins
A/E Review / Approve - Nyloplast Basins
Fab - Nyloplast Basins
Deliver - Nyloplast Basins
Submittal Prep - Domestic Water Vault
McC Review / Submit - Domestic Water Vault
A/E Review / Approve - Domestic Water Vault
Fab - Domestic Water Vault
Deliver - Domestic Water Vault
Deliver OFCI Power Systems (By Owner)
Deliver Kitchen Equipment OFOI (By Owner)
Deliver Wa lk-In Coo ler / Fre ezer OFOI (B y Own er)
Deliver Targets OFCI (By Owner)
Deliver Poles / Netting OFOI (By Owner)
Deliver Hitting Bay Equipment OFOI (By Owner)
Deliver OFCI Lighting (By Owner)
Deliver OFOI Turf (By Owner)
Deliver Bar Equipment OFOI (By Owner)
Form / Rebar / Pour Concrete Mock-Up
A/E Review & Approve Concrete Mock-Up
Frame Exterior Walls - Building Enclosure Moc k-Up
Exterior Sheathing - Building Enclosure Mock-Up
Install Flashing - Building Enclosure Mock-Up
Air & Water Ba rrie r - Bu il din g En cl osu re Mock-Up EIFS System - Building Enclosure Mock-Up
Composite Metal Panels - Building Enclosure Mock-Up
Rain Screen System - Building Enclosure Mock-Up
Storefront / Curtainwall System - Building Enclosure Mock-Up A/E Review & Approve Building Enclosure Mock-Up
Install SWPPPs / BMP's
Install Construction Fence / Signage / Restrooms / Handwash Stations Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 10 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 130 of 259 ends
Page 52 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
SM-1050 Set Up Office Trailer 5 Nov-14-22 Nov-18-22 16
SM-1070 Install Construction Temporary Power 10 Nov-21-22 Dec-06-22 102 SM-1090 Install Sewer / Water / Power for Trailer 15 Nov-21-22 Dec-13-22 223 Site PreparationSite Preparation 220 Nov-14-22 Sep-26-23 15 Site DemolitionSite Demolition 10 Nov-14-22 Nov-29-22 10 SD-1499 Safe Off (E) Electrical 3 Nov-14-22 Nov-16-22 10 SD-1510 Safe Off (E) Plumbing 3 Nov-14-22 Nov-16-22 10
SD-1520 Cut & Cap (E) Landscape Water 3 Nov-14-22 Nov-16-22 10 SD-1509 Stake Property Line & Limits of Work 2 Nov-14-22 Nov-15-22 11 SD-1880 Site Demolition & Grubbing 7 Nov-17-22 Nov-29-22 10 Site GradingSite Grading 15 Nov-21-22 Dec-13-22 49
V enueV enue 6 Nov-21-22 Nov-30-22 10
SD-9560 Survey & Stake for Grading 1 Nov-21-22 Nov-21-22 10 SG-2760 Rough Grade / Over-Excavate & Recompact - Building Pad 5 Nov-22-22 Nov-30-22 10 Parking LotParking Lot 9 Dec-01-22 Dec-13-22 49
SG-1509 Rough Grade / Over-Excavate & Recompact - Parking Lot 9 Dec-01-22 Dec-13-22 49 Site UtilitiesSite Utilities 54 Apr-27-23 Jul-13-23 6
Retention BasinRetention Basin 54 Apr-27-23 Jul-13-23 6 UT-3750 Layout / Survey - Retention & Biofiltration Unit Location & Elevation (#4) 1 Apr-27-23 Apr-27-23 6 UT-3760 Excavate / Compact for U/G Retention System & Biofiltration Unit (#4) 10 Apr-28-23 May-11-23 6 UT-3770 Install Bedding for U/G Retention System (#4) 5 May-12-23 May-18-23 6 UT-4060 Install 96" CMP System / Backfill / Compact (#4) 9 May-19-23 Jun-01-23 6 UT-4070 Set Biofiltration Unit / Backfill / Compact (#4) 3 Jun-02-23 Jun-06-23 6 UT-2280 Install Lift Stations - Site Utilities (#5) 15 Jun-07-23 Jun-27-23 6 UT-4080 F/R/P Set Manhole Cover (#5) 3 Jun-28-23 Jun-30-23 6 UT-15100 Install Storm Drain Piping / Manholes North of T opgolf Way (#6) 8 Jul-03-23 Jul-13-23 6 Utility ProvidersUtility Providers 220 Nov-14-22 Sep-26-23 15 PowerPower 202 Dec-12-22 Sep-26-23 3
AdministrationAdministration 277 Dec-16-22 Sep-18-23 3
UT-7420 Schedule Crew for Pulling of Cable (Calendar Days) (SCE) 30 Dec-16-22 Jan-14-23 197 UT-7400 Schedule Crew for Electrical Equipment Installation (Calendar Days) (SCE)30 Jan-21-23 Feb-19-23 197 UT-7230 Release & Procure Electrical Equipment (Calendar Days) (SCE) 30 Aug-02-23 Aug-31-23 4 UT-15070 Schedule Crew for Electrical Termi nation (Calendar Days) (SCE) 10 Sep-09-23 Sep-18-23 3 ConstructionConstruction 202 Dec-12-22 Sep-26-23 3
UT-7430 Mandrel Electrical Conduit (SCE) 2 Dec-12-22 Dec-13-22 138 UT-7220 Pre-Inspection of Pull Box & Underground Conduit (SCE) 2 Dec-14-22 Dec-15-22 138 UT-7410 Pull Cable (SCE) 5 Jan-16-23 Jan-20-23 138
UT-7240 Install Electrical Equipment / Meter (SCE) 5 Sep-01-23 Sep-08-23 1 UT-15060 Terminate Electrical (SCE) 5 Sep-19-23 Sep-25-23 3 UT-7250 Final Inspection for Permanent Power (SCE) 1 Sep-26-23 Sep-26-23 3 Wa t erWa t er 21 Aug-19-23 Sep-19-23 20
UT-7450 Sc hedule Cr ew for W at er Met er Inst al la ti on ( C al en dar Days )30 Aug-19-23 Sep-17-23 28 UT-7460 Water Distric t Set Water Meter 2 Sep-18-23 Sep-19-23 20 Telephone / DataTelephone / Data 27 Jul-27-23 Sep-01-23 19 UT-7500 Schedule Crew for Pulling of Cable (Calendar Days) 30 Jul-27-23 Aug-25-23 30 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Set Up Office Trailer
Install Construction Temporary Power
Install Sewer / Water / Power for Trailer
Safe Off (E) Electrical
Safe Off (E) Plumbing
Cut & Cap (E) Landscape Water
Stake Property Line & Limits of Work
Site Demolition & Grubbing
Survey & Stake for Grading
Rough Grade / Over-Excavate & Recompact - Building Pad
Rough Grade / Over-Excavate & Recompact - Parking Lot
Layout / Survey - Retention & Biofiltration Unit Location & Elevation (#4) Excavate / Compact for U/G Retention System & Biofiltration Unit (#4) Install Bedding for U/G Retention System (#4)
Install 96" CMP System / Backfill / Compact (#4)
Set Biofiltration Unit / Backfill / Compact (#4)
Install Lift Stations - Site Utilities (#5)
F/R/P Set Manhole Cover (#5)
Install Storm Drain Piping / Manholes North of T opgol f Way (#6) Schedule Crew for Pulling of Cable (Calendar Days) (SCE) Schedule Crew for Electrical Equipment Installation (Calendar Days) (SCE) Release & Procure Electrical Equipment (Calendar Days) (SCE) Schedule Crew for Electrical Termination (Calendar Days) (SCE) Mandrel Electrical Conduit (SCE)
Pre-Inspection of Pull Box & Underground Conduit (SCE)
Pull Cable (SCE)
Install Electrical Equipment / Meter (SCE)
Terminate Electrical (SCE)
Final Inspection for Permanent Power (SCE)
Sc hedule Cr ew for W at er Met er Inst al la ti on ( C al en dar Days ) Water District Set Water Meter
Schedule Crew for Pulling of Cable (Calendar Days)
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 11 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 131 of 259 ends
Page 53 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
UT-7510 Pull Telephone / Data Cable 5 Aug-28-23 Sep-01-23 19 GasGas 157 Nov-14-22 Jun-27-23 76
UT-7470 SoCal Gas Company Design 120 Nov-14-22 May-04-23 75 UT-7390 Schedule Crew for Gas Meter Installation (Calendar Days) 30 May-05-23 Jun-03-23 109 UT-7440 SoCal Gas Set Gas Meter 2 Jun-05-23 Jun-06-23 76 UT-15080 Schedule Crew for Gas Inspection (Calendar Days) 14 Jun-07-23 Jun-20-23 110 UT-15090 SoCal Gas Inspection 5 Jun-21-23 Jun-27-23 76
VenueVenue 258 Dec-01-22 Dec-07-23 15
FoundationsFoundations 23 Dec-01-22 Jan-04-23 22
U to K Line (North)U to K Line (North) 15 Dec-01-22 Dec-21-22 12 FO-5340 Layout / Survey Foundations - K to U Line 2 Dec-01-22 Dec-02-22 10 FO-5330 Excavate Foundations - K to U Line 2 Dec-05-22 Dec-06-22 10 FO-5390 Form Foundations - K to U Line 2 Dec-07-22 Dec-08-22 10 FO-5350 Install Rebar - Foundations - K to U Line 5 Dec-08-22 Dec-14-22 10 FO-5360 Layout & Set Bolt Templates & Bolts / Survey - Foundations - K to U Line 5 Dec-13-22 Dec-19-22 10 FO-5400 Inspections - Foundations - K to U Line 1 Dec-19-22 Dec-19-22 12 FO-5370 Pour Foundations - K to U Line 1 Dec-20-22 Dec-20-22 12 FO-5320 Strip Forms - Foundations - K to U Line 1 Dec-21-22 Dec-21-22 12 K to A Line (South)K to A Line (South) 18 Dec-05-22 Dec-29-22 10 FO-4770 Layout / Survey Foundations - K to A Line 2 Dec-05-22 Dec-06-22 16 FO-4430 Excavate Foundations - K to A Line 2 Dec-07-22 Dec-08-22 15 FO-4800 Form Foundations - K to A Line 2 Dec-09-22 Dec-12-22 13 FO-4780 Install Rebar - Foundations - K to A Line 5 Dec-15-22 Dec-21-22 10 SOG-5120 Install Fire Riser Feed - Foundations - K to A Line 1 Dec-15-22 Dec-15-22 16 FO-4790 Layout & Set Bolt Templates & Bolts / Survey - Foundations - K to A Line 5 Dec-20-22 Dec-27-22 10 FO-4810 Inspections - Foundations - K to A Line 1 Dec-27-22 Dec-27-22 10 FO-4820 Pour Foundations - K to A Line 1 Dec-28-22 Dec-28-22 10 FO-2430 Strip Forms - Foundations - K to A Line 1 Dec-29-22 Dec-29-22 10 9/J.9 Column (10/S4.2)9/J.9 Column (10/S4.2) 7 Dec-01-22 Dec-09-22 21 FO-5760 Excavate - Foundation - 9/J.9 Column 1 Dec-01-22 Dec-01-22 24 FO-5790 Form - Foundation - 9/J.9 Column 1 Dec-02-22 Dec-02-22 24 FO-5770 Rebar - Foundation - 9/J.9 Column 1 Dec-05-22 Dec-05-22 24 FO-5780 Pour - Foundation - 9/J.9 Column 1 Dec-09-22 Dec-09-22 21 Elevator Pit "A"Elevator Pit "A" 23 Dec-01-22 Jan-04-23 22 FO-5800 Excavate - Foundation - Elevator Pit "A" 2 Dec-01-22 Dec-02-22 21 FO-5810 Form - Foundation & Slab Bottom - Elevator Pit "A" 1 Dec-05-22 Dec-05-22 21 FO-4450 Install Rebar at Elevator Pit Wall - Elevator Pit "A" 1 Dec-06-22 Dec-06-22 31 FO-5820 Rebar - Foundation - Elevator Pit "A" 1 Dec-06-22 Dec-06-22 21 FO-6680 Install Waterproofing - El evator "A" 1 Dec-07-22 Dec-07-22 21 FO-7370 Inspections Slab - Elevator Pit "A" 1 Dec-08-22 Dec-08-22 21 FO-5830 Pour - Pit Slab - Elevator Pit "A" 1 Dec-09-22 Dec-09-22 21 FO-4550 Form Elevator Pit Wal ls - El evator Pi t "A" 3 Dec-21-22 Dec-23-22 21 FO-5180 Inspection - Elevator Pit "A" 1 Dec-27-22 Dec-27-22 21 FO-4560 Pour Elevator Pit Walls - Elev ator Pit "A" 1 Dec-28-22 Dec-28-22 21 FO-4570 Strip Outside Forms - Elevator Pit "A" 1 Dec-29-22 Dec-29-22 23 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Pull Telephone / Data Cable
SoCal Gas Company Design
Schedule Crew for Gas Meter Installation (Calendar Days) SoCal Gas Set Gas Meter
Schedule Crew for Gas Inspection (Calendar Days)
SoCal Gas Inspection
Layout / Survey Foundations - K to U Line
Excavate Foundations - K to U Line
Form Foundations - K to U Line
Install Rebar - Foundations - K to U Line
Layout & Set Bolt Templates & Bolts / Survey - Foundations - K to U Line Inspections - Foundations - K to U Line
Pour Foundations - K to U Line
Strip Forms - Foundations - K to U Line
Layout / Survey Foundations - K to A Line
Excavate Foundations - K to A Line
Form Foundations - K to A Line
Install Rebar - Foundations - K to A Line
Install Fire Riser Feed - Foundations - K to A Line
Layout & Set Bolt Templates & Bolts / Survey - Foundati ons - K to A Line Inspections - Foundations - K to A Line
Pour Foundations - K to A Line
Strip Forms - Foundations - K to A Line
Excavate - Foundation - 9/J.9 Column
Form - Foundation - 9/J.9 Column
Rebar - Foundation - 9/J.9 Column
Pour - Foundation - 9/J.9 Column
Excavate - Foundation - Elevator Pit "A"
Form - Foundation & Slab Bottom - Elevator Pit "A"
Install Rebar at Elevator Pit Wall - Elev ator Pit "A" Rebar - Foundation - Elevator Pit "A"
Install Waterproofi ng - El evator "A"
Inspections Slab - Elevator Pit "A"
Pour - Pit Slab - Elevator Pit "A"
Form Elevator Pit Wal ls - El evator Pi t "A"
Inspection - Elevator Pit "A"
Pour Elevator Pit Walls - Elev ator Pit "A"
Strip Outside Forms - Elevator Pit "A"
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 12 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 132 of 259 ends
Page 54 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
FO-4580 Cur e Elev ator Pit W al ls ( C al en dar Days ) - Elev ator Pi t " A " 3 Dec-29-22 Dec-31-22 32 FO-4590 Waterproof El evator Pi t Walls - Elevator Pits "A" 1 Jan-03-23 Jan-03-23 22 FO-4600 Backfill - Elevator Pits "A" 1 Jan-04-23 Jan-04-23 22 Elevator Pit "B"Elevator Pit "B" 12 Dec-12-22 Dec-28-22 19 FO-5200 Form Elevator Pit Slab Bottom - Elevator Pit "B" 1 Dec-12-22 Dec-12-22 21 FO-5210 Install Rebar for Elevator Pit Slab & Wall s - Elevator Pit "B" 1 Dec-13-22 Dec-13-22 21 FO-5230 Inspections Slab - Elevator Pit "B" 1 Dec-13-22 Dec-13-22 21 FO-5240 Pour Elevator Pit Slab - Elevator Pit "B" 1 Dec-14-22 Dec-14-22 21 FO-5290 Form Elevator Pit Wal ls & Pilaster - Elevator Pit "B" 2 Dec-15-22 Dec-16-22 21 FO-5300 Inspection Elevator Pit Wall s - Elevator Pit "B" 1 Dec-19-22 Dec-19-22 21 FO-5310 Pour Elevator Pit Walls & Pilas ter - Elev ator Pit "B" 1 Dec-20-22 Dec-20-22 21 FO-5250 Cur e Elev ator Pit W al ls ( C al en dar Days ) - Elev ator Pi t " B " 3 Dec-21-22 Dec-23-22 31 FO-5260 Str ip Wa ll & Pilas te r F or ms - Elev at or Pi t "B "1 Dec-21-22 Dec-21-22 21 FO-5270 Waterproofing Elevator Pi t Walls - Elevator Pit "B" 1 Dec-27-22 Dec-27-22 19 FO-5380 Backfill - Elevator Pit "B" 1 Dec-28-22 Dec-28-22 19 Slab on GradeSlab on Grade 35 Dec-22-22 Feb-10-23 67
MEPsMEPs 13 Dec-22-22 Jan-11-23 10
U to K Line (North)U to K Line (North) 7 Dec-22-22 Jan-03-23 15 SOG-5470 Fine Grade for Slab-on-Grade - U to K Line 3 Dec-22-22 Dec-27-22 12 SOG-5410 Underground Electrical / Low Voltage - Slab-on-Grade - U to K Line 2 Dec-28-22 Dec-29-22 15 SOG-5420 Underground Plumbing - Slab-on-Grade - U to K Line 2 Dec-28-22 Dec-29-22 15 SOG-5430 Inspection Underground Plumbing - Slab-on-Grade - U to K Line 1 Dec-30-22 Dec-30-22 15 SOG-5440 Inspection Underground Electrical - Slab-on-Grade - U to K Line 1 Dec-30-22 Dec-30-22 15 SOG-5450 Backfill / Compact Underground Plumbing - Slab-on-Grade - U to K Line 1 Jan-03-23 Jan-03-23 15 SOG-5460 Backfill / Compact Underground Electrical - Slab-on-Grade - U to K Line 1 Jan-03-23 Jan-03-23 15 K to A Line (South)K to A Line (South) 8 Dec-30-22 Jan-11-23 10 SOG-9701 Fine Grade for Slab-on-Grade - K to A Line 3 Dec-30-22 Jan-04-23 10 SOG-9601 Underground Electrical / Low Voltage - Slab-on-Grade - K to A Line 2 Jan-05-23 Jan-06-23 10 SOG-9501 Underground Plumbing - Slab-on-Grade - K to A Line 2 Jan-05-23 Jan-06-23 10 SOG-4990 Inspection Underground Plumbing - Slab-on-Grade - K to A Line 1 Jan-09-23 Jan-09-23 10 SOG-5000 Inspection Underground Electrical - Slab-on-Grade - K to A Line 1 Jan-09-23 Jan-09-23 10 SOG-5010 Backfill / Compact Underground Plumbing - Slab-on-Grade - K to A Line 1 Jan-10-23 Jan-10-23 10 SOG-5020 Backfill / Compact Underground Electrical - Slab-on-Grade - K to A Line 1 Jan-10-23 Jan-10-23 10 SOG-5110 Certify Building Pad 1 Jan-11-23 Jan-11-23 10
U to K Line (North)U to K Line (North) 27 Dec-28-22 Feb-03-23 68 SOG-5480 Form Perimeter - Slab-on-Grade - U to K Line 5 Dec-28-22 Jan-04-23 15 SOG-5490 Install Sand & Vapor Barrier - Slab-on-Grade - U to K Line 5 Jan-12-23 Jan-18-23 10 SOG-5510 Install Rebar - Slab-on-Grade - U to K Line 4 Jan-19-23 Jan-24-23 10 SOG-5520 Install Electrical - Slab-on-Grade - U to K Line 3 Jan-23-23 Jan-25-23 11 SOG-5530 Install Plumbing - Slab-on-Grade - U to K Line 3 Jan-23-23 Jan-25-23 11 SOG-5540 Set Embeds - Slab-on-Grade - U to K Line 1 Jan-25-23 Jan-25-23 10 SOG-5550 Inspection - Slab-on-Grade - U to K Line 1 Jan-26-23 Jan-26-23 10 SOG-5560 Pour - Slab-on-Grade - U to K Line 1 Jan-27-23 Jan-27-23 10 SOG-5570 Cure - Slab-on-Grade (Calendar Days) - U to K Line 7 Jan-28-23 Feb-03-23 16 SOG-5590 Saw Cut Joints - Slab-on-Grade - U to K Line 1 Jan-30-23 Jan-30-23 72 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Cur e Elev ator Pit W al ls ( C al en dar Days ) - Elev ator Pi t " A " Waterproof El evator Pi t Walls - Elevator Pits "A"
Backfill - Elevator Pits "A"
Form Elevator Pit Slab Bottom - Elevator Pit "B"
Install Rebar for Elevator Pit Slab & Wall s - Elevator Pit "B" Inspections Slab - Elevator Pit "B"
Pour Elevator Pit Slab - Elevator Pit "B"
Form Elevator Pit Walls & Pilaster - Elevator Pit "B"
Inspection Elevator Pit Wall s - Elev ator Pit "B"
Pour Elevator Pit Walls & Pilas ter - Elev ator Pit "B" Cur e Elev ator Pit W al ls ( C al en dar Days ) - Elev ator Pi t " B " Strip Wa ll & Pilas te r F orms - Elev at or Pit "B " Waterproofing Elevator Pi t Walls - Elevator Pit "B"
Backfill - Elevator Pit "B"
Fine Grade for Slab-on-Grade - U to K Line
Underground Electrical / Low Voltage - Slab-on-Grade - U to K Line Underground Plumbing - Slab-on-Grade - U to K Line
Inspection Underground Plumbing - Slab-on-Grade - U to K Line Inspection Underground Electrical - Slab-on-Grade - U to K Line Backfill / Compact Underground Plumbing - Slab-on-Grade - U to K Line Backfill / Compact Underground Electrical - Slab-on-Grade - U to K Line Fine Grade for Slab-on-Grade - K to A Line
Underground Electrical / Low Voltage - Slab-on-Grade - K to A Line Underground Plumbing - Slab-on-Grade - K to A Line
Inspection Underground Plumbing - Slab-on-Grade - K to A Line Inspection Underground Electrical - Slab-on-Grade - K to A Line Backfill / Compact Underground Plumbing - Slab-on-Grade - K to A Line Backfill / Compact Underground Electrical - Slab-on-Grade - K to A Line Certify Building Pad
Form Perimeter - Slab-on-Grade - U to K Line
Install Sand & Vapor Barrier - Slab-on-Grade - U to K Line Install Rebar - Slab-on-Grade - U to K Line
Install Electrical - Slab-on-Grade - U to K Line
Install Plumbing - Slab-on-Grade - U to K Line
Set Embeds - Slab-on-Grade - U to K Line
Inspection - Slab-on-Grade - U to K Line
Pour - Slab-on-Grade - U to K Line
Cure - Slab-on-Grade (Calendar Days) - U to K Line
Saw Cut Joints - Slab-on-Grade - U to K Line
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 13 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 133 of 259 ends
Page 55 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
K to A Line (South)K to A Line (South) 27 Jan-05-23 Feb-10-23 67 SOG-5040 Form Perimeter - Slab-on-Grade - K to A Line 5 Jan-05-23 Jan-11-23 17 SOG-9801 Install Sand & Vapor Barrier - Slab-on-Grade - K to A Line 5 Jan-19-23 Jan-25-23 12 SOG-5030 Install Rebar - Slab-on-Grade - K to A Line 4 Jan-26-23 Jan-31-23 12 SOG-5090 Install Electrical - Slab-on-Grade - K to A Line 3 Jan-30-23 Feb-01-23 13 SOG-5101 Install Plumbing - Slab-on-Grade - K to A Line 3 Jan-30-23 Feb-01-23 13 SOG-5080 Set Embeds - Slab-on-Grade - K to A Line 1 Feb-01-23 Feb-01-23 12 SO G -5112Inspection - Slab-on-Grade - K to A Line 1 Feb-02-23 Feb-02-23 12 SOG-5050 Pour - Slab-on-Grade - K to A Line 1 Feb-03-23 Feb-03-23 12 SOG-5170 Cure - Slab-on-Grade (Calendar Days) - K to A Line 7 Feb-04-23 Feb-10-23 18 SOG-5213 Saw Cut Joints - Slab-on-Grade - K to A Line 1 Feb-06-23 Feb-06-23 71 Structural SteelStructural Steel 44 Feb-20-23 Apr-20-23 3 North (Sequence 1, 2, 3) - U to K LineNorth (Sequence 1, 2, 3) - U to K Line 37 Feb-20-23 Apr-11-23 6 SU- 1100 Erect Structural Steel - North - U to K Line 7 Feb-20-23 Feb-28-23 0 SU-6090 Bolt-Up Structural Steel - North - U to K Line 5 Mar-01-23 Mar-07-23 0 SU-6102 Plumb & Line Structural Steel - North - U to K Line 5 Mar-08-23 Mar-14-23 0 SU- 6110 Weld Structural Steel - North - U to K Line 20 Mar-15-23 Apr-11-23 0 SU-6190 Dry-Pack Column Bases - North - U to K Line 4 Mar-15-23 Mar-20-23 22 South (Sequence 4, 5, 6) - K to A LineSouth (Sequence 4, 5, 6) - K to A Line 37 Mar-01-23 Apr-20-23 3 SU-5620 Erect Structural Steel - South - K to A Line 7 Mar-01-23 Mar-09-23 0 SU-6140 Bolt-Up Structural Steel - South - K to A Line 5 Mar-10-23 Mar-16-23 0 SU-6150 Plumb & Line Structural Steel - South - K to A Line 5 Mar-17-23 Mar-23-23 0 SU-6160 Weld Structural Steel - South - K to A Li ne 20 Mar-24-23 Apr-20-23 0 SU-5700 Dry-Pack Column Bases - South - K to A Line 4 Mar-24-23 Mar-29-23 19 StairsStairs 76 May-09-23 Aug-24-23 45
Stair #4 (Exterior Stairs North)Stair #4 (Exterior Stairs North) 15 May-09-23 May-30-23 86 ST-1560 Erect Stairs - Stair #4 3 May-09-23 May-11-23 86 ST-1570 Plumb / Line / Bolt & Weld Stairs - Stair #4 3 May-12-23 May-16-23 86 ST-1580 Install Handrail / Weld - Stair #4 5 May-17-23 May-23-23 86 ST-1590 Install Mesh - Stair #4 1 May-17-23 May-17-23 89 ST-1610 Pour Concrete Stair #4 1 May-18-23 May-18-23 89 ST-1620 Paint Stair & Handrail - Stair #4 2 May-24-23 May-25-23 86 ST-1980 Exterior Light Fixture - Stair #4 2 May-26-23 May-30-23 86 Stair #3 (Interior Stairs)Stair #3 (Interior Stairs) 14 May-09-23 May-26-23 107 ST-1490 Erect Stairs - Stair #3 3 May-09-23 May-11-23 107 ST-1500 Plumb / Line / Bolt & Weld Stairs - Stair #3 3 May-12-23 May-16-23 107 ST-1510 Install Handrail / Weld - Stair #3 5 May-17-23 May-23-23 107 ST-1520 Install Mesh - Stair #3 1 May-17-23 May-17-23 111 ST-1540 Pour Concrete Stair #3 1 May-24-23 May-24-23 107 ST-1550 Paint Stair & Handrail - Stair #3 2 May-25-23 May-26-23 107 Stair #1 (Exterior Stairs South)Stair #1 (Exterior Stairs South) 16 May-09-23 May-31-23 85 ST-3101 Erect Stairs - Stair #1 3 May-09-23 May-11-23 48 ST-3601 Plumb / Line / Bolt & Weld Stairs - Stair #1 3 May-12-23 May-16-23 85 ST-3701 Install Handrail / Weld - Stair #1 5 May-17-23 May-23-23 85 ST-1380 Install Mesh - Stair #1 1 May-17-23 May-17-23 89 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Form Perimeter - Slab-on-Grade - K to A Line
Install Sand & Vapor Barrier - Slab-on-Grade - K to A Line Install Rebar - Slab-on-Grade - K to A Line
Install Electrical - Slab-on-Grade - K to A Line
Install Plumbing - Slab-on-Grade - K to A Line
Set Embeds - Slab-on-Grade - K to A Line
Inspection - Slab-on-Grade - K to A Line
Pour - Slab-on-Grade - K to A Line
Cure - Slab-on-Grade (Calendar Days) - K to A Line
Saw Cut Joints - Slab-on-Grade - K to A Line
Erect Structural Steel - North - U to K Line
Bolt-Up Structural Steel - North - U to K Line
Plumb & Line Structural Steel - North - U to K Line
Weld Structural Steel - North - U to K Line
Dry-Pack Column Bases - North - U to K Line
Erect Structural Steel - South - K to A Line
Bolt-Up Structural Steel - South - K to A Line
Plumb & Line Structural Steel - South - K to A Line
Weld Structural Steel - South - K to A Li ne
Dry-Pack Column Bases - South - K to A Line
Erect Stairs - Stair #4
Plumb / Line / Bolt & Weld Stairs - Stair #4
Install Handrail / Weld - Stair #4
Install Mesh - Stair #4
Pour Concrete Stair #4
Paint Stair & Handrail - Stair #4
Exterior Light Fixture - Stair #4
Erect Stairs - Stair #3
Plumb / Line / Bolt & Weld Stairs - Stair #3
Install Handrail / Weld - Stair #3
Install Mesh - Stair #3
Pour Concrete Stair #3
Paint Stair & Handrail - Stair #3
Erect Stairs - Stair #1
Plumb / Line / Bolt & Weld Stairs - Stair #1
Install Handrail / Weld - Stair #1
Install Mesh - Stair #1
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 14 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 134 of 259 ends
Page 56 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
ST-1400 Pour Concrete Stair #1 1 May-24-23 May-24-23 85 ST-1410 Paint Stair & Handrail - Stair #1 2 May-25-23 May-26-23 85 ST-1440 Exterior Light Fixture - Stair #1 2 May-30-23 May-31-23 85 Stair #2 (Lobby Stairs)Stair #2 (Lobby Stairs) 76 May-09-23 Aug-24-23 45 ST-1420 Erect Stairs - Stair #2 3 May-09-23 May-11-23 48 ST-1430 Plumb / Line / Bolt & Weld Stairs - Stair #2 3 May-12-23 May-16-23 48 ST-3711 Paint Steel - Stair #2 2 May-17-23 May-18-23 70 ST-3721 Field Measure Concrete Stair Treads - Stair #2 2 May-17-23 May-18-23 48 ST-1450 Install Glass Handrail - Stair #2 10 Jul-17-23 Jul-28-23 31 ST-1470 Set Concrete Stair Treads - Stair #2 5 Aug-18-23 Aug-24-23 45 Slab-on-Grade DiamondsSlab-on-Grade Diamonds 11 Mar-21-23 Apr-04-23 19 SOG-5100 Pour Back Diamonds at Slab-on-Grade - U to K Line 4 Mar-21-23 Mar-24-23 26 SOG-981 1 Pour Back Diamonds at Slab-on-Grade - K to A Line 4 Mar-30-23 Apr-04-23 19 Metal DeckingMetal Decking 22 Mar-29-23 Apr-27-23 0
Gridline U to K LineGridline U to K Line 15 Mar-29-23 Apr-18-23 0 SU- 1110 Metal Decking / Weld / Nelson Studs - Middle Level - Gridline U to K Line 5 Mar-29-23 Apr-04-23 0 SU-5881 Metal Decking / Weld / Nelson Studs - Upper Level - Gridline U to K Line 5 Apr-05-23 Apr-11-23 0 SU-5902 Metal Decking / Weld / Nelson Studs - Roof Level - Gridline U to K Line 5 Apr-12-23 Apr-18-23 0 Gridline K to A LineGridline K to A Line 15 Apr-07-23 Apr-27-23 0 SU-5670 Metal Decking / Weld / Nelson Studs - Middle Level - Gridline K to A Line 5 Apr-07-23 Apr-13-23 0 SU-5690 Metal Decking / Weld / Nelson Studs - Upper Level - Gridline K to A Line 5 Apr-14-23 Apr-20-23 0 SU-5680 Metal Decking / Weld / Nelson Studs - Roof Level - Gridline K to A Line 5 Apr-21-23 Apr-27-23 0 Slab On Metal Deck - SOMDSlab On Metal Deck - SOMD 21 Apr-12-23 May-10-23 11 Middle LevelMiddle Level 19 Apr-12-23 May-08-23 10
Gridline U to J.5 LineGridline U to J.5 Line 11 Apr-12-23 Apr-26-23 14 SU-5840 Electrical Layout Blockouts & Inserts - Gridline U to J.5 / H.9 - Middle Level2 Apr-12-23 Apr-13-23 6 SU-5850 Plumbing Layout Blockouts & Inserts - Gridline U to J.5 / H.9 - Middle Level2 Apr-12-23 Apr-13-23 8 SU-5860 Mechanical Layout Blockouts & Inserts - Gridline U to J.5 / H.9 - Middle Level2 Apr-12-23 Apr-13-23 8 SU-5880 Install Electrical Deck Inserts & Sleeves - Gridline U to J.5 / H.9 - Middle Level2 Apr-13-23 Apr-14-23 8 SU-5890 Install Plumbing Deck Inserts & Sleeves - Gridline U to J.5 / H.9 - Middle Level2 Apr-13-23 Apr-14-23 8 SU-5900 Install Mechanical Deck Inserts & Sleeves - Gridline U to J.5 / H.9 - Middle Level2 Apr-13-23 Apr-14-23 8 SU-5870 Form Blockouts - Gridline U to J.5 / H.9 - Middle Level 2 Apr-13-23 Apr-14-23 8 SU-5910 Install Rebar - Gridline U to J.5 / H.9 - Middle Level 2 Apr-17-23 Apr-18-23 8 SU-5920 Pour Concrete Slab on Metal Deck - Gridline U to J.5 / H.9 - Middle Level 1 Apr-19-23 Apr-19-23 8 SU-5930 Cure Deck - Gridline U to J.5 / H.9 - Middle Level (Calendar Days) 7 Apr-20-23 Apr-26-23 20 Gridline J.5 to A LineGridline J.5 to A Line 11 Apr-24-23 May-08-23 10 SU-8283 Electrical Layout Blockouts & Inserts - Gridline J.5 / H.9 to A - Middle Level2 Apr-24-23 Apr-25-23 0 SU-8284 Plumbing Layout Blockouts & Inserts - Gridline J.5 / H.9 to A - Middle Level2 Apr-24-23 Apr-25-23 0 SU-3504 Mechanical Layout Blockouts & Inserts - Gridline J.5 / H.9 to A - Middle Level2 Apr-24-23 Apr-25-23 0 SU-8281 Install Electrical Deck Inserts & Sleeves - Gridline J.5 / H.9 to A - Middle Level2 Apr-25-23 Apr-26-23 0 SU-8282 Install Plumbing Deck Inserts & Sleeves - Gridline J.5 / H.9 to A - Middle Level2 Apr-25-23 Apr-26-23 0 SU-3004 Install Mechanical Deck Inserts & Sleeves - Gridline J.5 / H.9 to A - Middle Level2 Apr-25-23 Apr-26-23 0 SU-3704 Form Blockouts - Gridline J.5 / H.9 to A - Middle Level 2 Apr-25-23 Apr-26-23 0 SU-4704 Install Rebar - Gridline J.5 / H.9 to A - Middle Level 2 Apr-27-23 Apr-28-23 0 SU-8120 Pour Concrete Slab on Metal Deck - Gridline J.5 / H.9 to A - Middle Level 1 May-01-23 May-01-23 0 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Pour Concrete Stair #1
Paint Stair & Handrail - Stair #1
Exterior Light Fixture - Stair #1
Erect Stairs - Stair #2
Plumb / Line / Bolt & Weld Stairs - Stair #2
Paint Steel - Stair #2
Field Measure Concrete Stair Treads - Stair #2
Install Glass Handrail - Stair #2
Set Concrete Stair Treads - Stair #2
Pour Back Diamonds at Slab-on-Grade - U to K Line
Pour Back Diamonds at Slab-on-Grade - K to A Line
Metal Decking / Weld / Nelson Studs - Middle Level - Gridline U to K Line Metal Decking / Weld / Nelson Studs - Upper Level - Gridline U to K Line Metal Decking / Weld / Nelson Studs - Roof Level - Gridline U to K Line Metal Decking / Weld / Nelson Studs - Middle Level - Gridline K to A Line Metal Decking / Weld / Nelson Studs - Upper Level - Gridline K to A Line Metal Decking / Weld / Nelson Studs - Roof Level - Gridline K to A Line Electrical Layout Blockouts & Inserts - Gridline U to J.5 / H.9 - Middle Level Plumbing Layout Blockouts & Inserts - Gridline U to J.5 / H.9 - Middle Level Mechanical Layout Blockouts & Inserts - Gridline U to J.5 / H.9 - Middle Level Install Electrical Deck Inserts & Sleeves - Gridline U to J.5 / H.9 - Middle Level Install Plumbing Deck Inserts & Sleeves - Gridline U to J.5 / H.9 - Middle Level Install Mechanical Deck Inserts & Sleeves - Gridline U to J.5 / H.9 - Middle Level Form Blockouts - Gridline U to J.5 / H.9 - Middle Level Install Rebar - Gridline U to J.5 / H.9 - Middle Level
Pour Concrete Slab on Metal Deck - Gridline U to J.5 / H.9 - Middle Level Cure Deck - Gridline U to J.5 / H.9 - Middle Level (Calendar Days) Electrical Layout Blockouts & Inserts - Gridline J.5 / H.9 to A - Middle Level Plumbing Layout Blockouts & Inserts - Gridline J.5 / H.9 to A - Middle Level Mechanical Layout Blockouts & Inserts - Gridline J.5 / H.9 to A - Middle Level Install Electrical Deck Inserts & Sleeves - Gridline J.5 / H.9 to A - Middle Level Install Plumbing Deck Inserts & Sleeves - Gridline J.5 / H.9 to A - Middle Level Install Mechanical Deck Inserts & Sleeves - Gridline J.5 / H.9 to A - Middle Level Form Blockouts - Gridline J.5 / H.9 to A - Middle Level Install Rebar - Gridline J.5 / H.9 to A - Middle Level
Pour Concrete Slab on Metal Deck - Gridline J.5 / H.9 to A - Middle Level Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 15 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 135 of 259 ends
Page 57 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
SU-8590 Cure Deck - Gridline J.5 / H.9 to A - Middle Level (Calendar Days) 7 May-02-23 May-08-23 14 Upper LevelUpper Level 16 Apr-19-23 May-10-23 11
Gridline U to J LineGridline U to J Line 9 Apr-19-23 May-01-23 8 SU-2850 Electrical Layout Blockouts & Inserts - Gridline U to J - Upper Level 2 Apr-19-23 Apr-20-23 0 SU-2860 Plumbing Layout Blockouts & Inserts - Gridline U to J - Upper Level 2 Apr-19-23 Apr-20-23 0 SU-0502 Mechanical Layout Blockouts & Inserts - Gridline U to J - Upper Level 2 Apr-19-23 Apr-20-23 0 SU-2870 Install Electrical Deck Inserts & Sleeves - Gridline U to J - Upper Level 2 Apr-20-23 Apr-21-23 0 SU-2880 Install Plumbing Deck Inserts & Sleeves - Gridline U to J - Upper Level 2 Apr-20-23 Apr-21-23 0 SU-0602 Install Mechanical Deck Inserts & Sleeves - Gridline U to J - Upper Level 2 Apr-20-23 Apr-21-23 0 SU-5070 Form Blockouts - Gridline U to J - Upper Level 2 Apr-20-23 Apr-21-23 2 SU-5080 Install Rebar - Gridline U to J - Upper Level 2 Apr-24-23 Apr-25-23 0 SU-5090 Pour Concrete Slab on Metal Deck - Gridline U to J - Upper Level 1 Apr-26-23 Apr-26-23 0 SU-8610 Cure Deck - Gridline U to J - Upper Level (Calendar Days) 5 Apr-27-23 May-01-23 10 Gridline J to A LineGridline J to A Line 9 Apr-28-23 May-10-23 11 SU-1940 Electrical Layout Blockouts & Inserts - Gridline J to A - Upper Level 2 Apr-28-23 May-01-23 0 SU-1950 Plumbing Layout Blockouts & Inserts - Gridline J to A - Upper Level 2 Apr-28-23 May-01-23 0 SU-1960 Mechanical Layout Blockouts & Inserts - Gridline J to A - Upper Level 2 Apr-28-23 May-01-23 0 SU-1980 Install Electrical Deck Inserts & Sleeves - Gridline J to A - Upper Level 2 May-01-23 May-02-23 0 SU-1990 Install Plumbing Deck Inserts & Sleeves - Gridline J to A - Upper Level 2 May-01-23 May-02-23 0 SU-1600 Install Mechanical Deck Inserts & Sleeves - Gridline J to A - Upper Level 2 May-01-23 May-02-23 0 SU-1970 Form Blockouts - Gridline J to A - Upper Level 2 May-01-23 May-02-23 2 SU-1601 Install Rebar - Gridline J to A - Upper Level 2 May-03-23 May-04-23 0 SU-1602 Pour Concrete Slab on Metal Deck - Gridline J to A - Upper Level 1 May-05-23 May-05-23 0 SU-6030 Cure Deck - Gridline J to A - Upper Level (Calendar Days) 5 May-06-23 May-10-23 15 RoofRoof 13 Apr-19-23 May-05-23 12
Gridline U to J LineGridline U to J Line 6 Apr-19-23 Apr-26-23 19 SU-2890 Electrical Layout Inserts - Gridline U to J - Roof 2 Apr-19-23 Apr-20-23 13 SU-2900 Plumbing Layout Inserts - Gridline U to J - Roof 2 Apr-19-23 Apr-20-23 18 SU-5150 Mechanical Layout Inserts - Gridline U to J - Roof 2 Apr-19-23 Apr-20-23 13 SU-9170 Safety Cable Davits Tie Off Points - Gridline U to J - Roof 5 Apr-19-23 Apr-25-23 20 SU-2910 Install Electrical Deck Inserts & Sleeves - Gridline U to J - Roof 3 Apr-20-23 Apr-24-23 13 SU-2920 Install Plumbing Deck Inserts & Sleeves - Gridline U to J - Roof 3 Apr-20-23 Apr-24-23 18 SU-2930 Install Electrical Roof Supports - Gridline U to J - Roof 5 Apr-20-23 Apr-26-23 19 SU-9160 Install Mechanical Roof Curbs - Gridline U to J - Roof 5 Apr-20-23 Apr-26-23 19 SU-5160 Install Mechanical Deck Inserts & Sleeves - Gridline U to J - Roof 3 Apr-20-23 Apr-24-23 13 SU-9150 Install Mechanical Roof Supports - Gridline U to J - Roof 5 Apr-20-23 Apr-26-23 19 Gridline J to A LineGridline J to A Line 6 Apr-28-23 May-05-23 12 SU-9950 Electrical Layout Inserts - Gridline J to A - Roof 2 Apr-28-23 May-01-23 6 SU-10000 Plumbing Layout Inserts - Gridline J to A - Roof 2 Apr-28-23 May-01-23 14 SU-9960 Mechanical Layout Inserts - Gridline J to A - Roof 2 Apr-28-23 May-01-23 6 SU-9970 Safety Cable Davits Tie Off Points - Gridline J to A - Roof 5 Apr-28-23 May-04-23 13 SU-9980 Install Electrical Deck Inserts & Sleeves - Gridline J to A - Roof 3 May-01-23 May-03-23 6 SU-10010 Install Plumbing Deck Inserts & Sleeves - Gridline J to A - Roof 3 May-01-23 May-03-23 14 SU-10020 Install Electrical Roof Supports - Gridline J to A - Roof 5 May-01-23 May-05-23 12 SU-10030 Install Mechanical Roof Curbs - Gridline J to A - Roof 5 May-01-23 May-05-23 12 SU-9990 Install Mechanical Deck Inserts & Sleeves - Gridline J to A - Roof 3 May-01-23 May-03-23 6 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Cure Deck - Gridline J.5 / H.9 to A - Middle Level (Calendar Days) Electrical Layout Blockouts & Inserts - Gridline U to J - Upper Level Plumbing Layout Blockouts & Inserts - Gridline U to J - Upper Level Mechanical Layout Blockouts & Inserts - Gridline U to J - Upper Level Install Electrical Deck Inserts & Sleeves - Gridline U to J - Upper Level Install Plumbing Deck Inserts & Sleeves - Gridline U to J - Upper Level Install Mechanical Deck Inserts & Sleeves - Gridline U to J - Upper Level Form Blockouts - Gridline U to J - Upper Level
Install Rebar - Gridline U to J - Upper Level
Pour Concrete Slab on Metal Deck - Gridline U to J - Upper Level Cure Deck - Gridline U to J - Upper Level (Calendar Days) Electrical Layout Blockouts & Inserts - Gridline J to A - Upper Level Plumbing Layout Blockouts & Inserts - Gridline J to A - Upper Level Mechanical Layout Blockouts & Inserts - Gridline J to A - Upper Level Install Electrical Deck Inserts & Sleeves - Gridline J to A - Upper Level Install Plumbing Deck Inserts & Sleeves - Gridline J to A - Upper Level Install Mechanical Deck Inserts & Sleeves - Gridline J to A - Upper Level Form Blockouts - Gridline J to A - Upper Level
Install Rebar - Gridline J to A - Upper Level
Pour Concrete Slab on Metal Deck - Gridline J to A - Upper Level Cure Deck - Gridline J to A - Upper Level (Calendar Days) Electrical Layout Inserts - Gridline U to J - Roof
Plumbing Layout Inserts - Gridline U to J - Roof
Mechanical Layout Inserts - Gridline U to J - Roof
Safety Cable Davits Tie Off Points - Gridline U to J - Roof Install Electrical Deck Inserts & Sleeves - Gridline U to J - Roof Install Plumbing Deck Inserts & Sleeves - Gridline U to J - Roof Install Electrical Roof Supports - Gridline U to J - Roof Install Mechanical Roof Curbs - Gridline U to J - Roof
Install Mechanical Deck Inserts & Sleeves - Gridline U to J - Roof Install Mechanical Roof Supports - Gridline U to J - Roof Electrical Layout Inserts - Gridline J to A - Roof
Plumbing Layout Inserts - Gridline J to A - Roof
Mechanical Layout Inserts - Gridline J to A - Roof
Safety Cable Davits Tie Off Points - Gridline J to A - Roof Install Electrical Deck Inserts & Sleeves - Gridline J to A - Roof Install Plumbing Deck Inserts & Sleeves - Gridline J to A - Roof Install Electrical Roof Supports - Gridline J to A - Roof Install Mechanical Roof Curbs - Gridline J to A - Roof
Install Mechanical Deck Inserts & Sleeves - Gridline J to A - Roof Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 16 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 136 of 259 ends
Page 58 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
SU-10040 Install Mechanical Roof Supports - Gridline J to A - Roof 5 May-01-23 May-05-23 12 Fire Proofing / MEP Supports / Polish ConcreteFire Proofing / MEP Supports / Polish Concrete 45 May-02-23 Jul-05-23 2 Lower LevelLower Level 33 May-02-23 Jun-16-23 1
SU-5940 Framing Layout - Lower Level 2 May-02-23 May-03-23 0 SU-5950 Install Framing Clips & Top Track - Lower Level 5 May-04-23 May-10-23 0 SU-2550 Install In-Wal l Tube Steel Supports at Bar - Lower Level 5 May-04-23 May-10-23 13 SU-6620 Polish Concrete & Protect Floor (Crew #1) - U to K Line - Lower Level 4 May-11-23 May-16-23 0 SU-9940 Polish Concrete & Protect Floor (Crew #1) - K to A Line - Lower Level 4 May-17-23 May-22-23 0 SU-2940 Install Electrical Hangers/Supports to Beams & Decking - Lower Level 5 May-23-23 May-30-23 0 SU-2950 Install Plumbing Hangers/Supports to Beams & Decking - Lower Level 5 May-23-23 May-30-23 0 SU-5960 Install Mechanical Hangers/Supports to Beams & Decking - Lower Level 5 May-23-23 May-30-23 0 SU-5970 Fireproofing - Lower Level 5 May-31-23 Jun-06-23 0 SU-7300 Prep Columns & Beams for Intumescent Paint - Lower Level 2 Jun-07-23 Jun-08-23 1 SU-5990 Intumescent Paint Exposed Columns & Beams - Lower Level 6 Jun-09-23 Jun-16-23 1 Middle LevelMiddle Level 35 May-08-23 Jun-26-23 1
SU-6290 Framing Layout - Middle Level 2 May-08-23 May-09-23 0 SU-6300 Install Framing Clips & Top Track - Middle Level 5 May-10-23 May-16-23 0 SU-6070 Install In-Wal l Tube Steel Supports at Bar - Middle Level 5 May-10-23 May-16-23 13 SU-6100 Polish Concrete & Protect Floor (Crew #2) - U to J.5 Line - Middle Level 4 May-17-23 May-22-23 0 SU-6630 Polish Concrete & Protect Floor (Crew #2) - J.5 to A Line - Middle Level 4 May-23-23 May-26-23 0 SU-2960 Install Electrical Hangers/Supports to Beams & Decking - Middle Level 5 May-30-23 Jun-05-23 0 SU-2970 Install Plumbing Hangers/Supports to Beams & Decking - Middle Level 5 May-30-23 Jun-05-23 0 SU-6310 Install Mechanical Hangers/Supports to Beams & Decking - Middle Level 5 May-30-23 Jun-05-23 0 SU-6320 Fireproofing - Middle Level 5 Jun-06-23 Jun-12-23 0 SU-7310 Prep Columns & Beams for Intumescent Paint - Middle Level 2 Jun-13-23 Jun-14-23 3 SU-6340 Intumescent Paint Expose Columns - Middle Level 6 Jun-19-23 Jun-26-23 1 Upper LevelUpper Level 39 May-10-23 Jul-05-23 2
SU-6410 Framing Layout - Upper Level 2 May-10-23 May-11-23 2 SU-6420 Install Framing Clips & Top Track - Upper Level 5 May-12-23 May-18-23 2 SU-6080 Install In-Wal l Tube Steel Supports at Bar - Upper Level 3 May-12-23 May-16-23 15 SU-2660 Support Steel for Operable Partition - Event Space - Upper Level 3 May-12-23 May-16-23 15 SU-6640 Polish Concrete & Protect Floor (Crew #1) - U to J Line - Upper Level 3 May-23-23 May-25-23 0 SU-6170 Polish Concrete & Protect Floor (Crew #1) - J to A Line - Upper Level 3 May-26-23 May-31-23 0 SU-2980 Install Electrical Hangers/Supports to Beams & Decking - Upper Level 5 Jun-01-23 Jun-07-23 0 SU-2990 Install Plumbing Hangers/Supports to Beams & Decking - Upper Level 5 Jun-01-23 Jun-07-23 0 SU-6430 Install Mechanical Hangers/Supports to Beams & Decking - Upper Level 5 Jun-01-23 Jun-07-23 0 SU-6440 Fireproofing - Upper Level 10 Jun-08-23 Jun-21-23 0 SU-7320 Prep Columns & Beams for Intumescent Paint - Upper Level 2 Jun-22-23 Jun-23-23 3 SU-6460 Intumescent Paint Expose Columns & Beams - Upper Level 6 Jun-27-23 Jul-05-23 2 Building EnclosureBuilding Enclosure 196 Dec-29-22 Oct-04-23 17 North / West ElevationNorth / West Elevation 100 Apr-27-23 Sep-18-23 25 EX-2940 Erect Exterior Scaffold System - North / West Elevation 5 Apr-27-23 May-03-23 0 EX-2860 Exterior Clips & Framing / Set HM Door Frames - North / West Elevation 10 May-04-23 May-17-23 0 EX-3000 Exterior Plumbing In-Wal l Rough In - North / West Elevation 5 May-18-23 May-24-23 0 EX-3180 Exterior Electrical In-Wal l Rough In - North / West Elevation 5 May-18-23 May-24-23 0 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Install Mechanical Roof Supports - Gridline J to A - Roof Framing Layout - Lower Level
Install Framing Clips & Top Track - Lower Level
Install In-Wal l Tube Steel Supports at Bar - Lower Level Polish Concrete & Protect Floor (Crew #1) - U to K Line - Lower Level Polish Concrete & Protect Floor (Crew #1) - K to A Line - Lower Level Install Electrical Hangers/Supports to Beams & Decking - Lower Level Install Plumbing Hangers/Supports to Beams & Decking - Lower Level Install Mechanical Hangers/Supports to Beams & Decking - Lower Level Fireproofing - Lower Level
Prep Columns & Beams for Intumescent Paint - Lower Level Intumescent Paint Exposed Columns & Beams - Lower Level Framing Layout - Middle Level
Install Framing Clips & Top Track - Middle Level
Install In-Wall Tube Steel Supports at Bar - Middle Level Polish Concrete & Protect Floor (Crew #2) - U to J.5 Line - Middle Level Polish Concrete & Protect Floor (Crew #2) - J.5 to A Line - Middle Level Install Electrical Hangers/Supports to Beams & Decking - Middle Level Install Plumbing Hangers/Supports to Beams & Decking - Middle Level Install Mechanical Hangers/Supports to Beams & Decking - Middle Level Fireproofing - Middle Level
Prep Columns & Beams for Intumescent Paint - Middle Level Intumescent Paint Expose Columns - Middle Level
Framing Layout - Upper Level
Install Framing Clips & Top Track - Upper Level
Install In-Wall Tube Steel Supports at Bar - Upper Level Support Steel for Operable Partition - Event Space - Upper Level Polish Concrete & Protect Floor (Crew #1) - U to J Line - Upper Level Polish Concrete & Protect Floor (Crew #1) - J to A Line - Upper Level Install Electrical Hangers/Supports to Beams & Decking - Upper Level Install Plumbing Hangers/Supports to Beams & Decking - Upper Level Install Mechanical Hangers/Supports to Beams & Decking - Upper Level Fireproofing - Upper Level
Prep Columns & Beams for Intumescent Paint - Upper Level Intumescent Paint Expose Columns & Beams - Upper Level
Erect Exterior Scaffold System - North / West Elevation Exterior Clips & Framing / Set HM Door Frames - North / West Elevation Exterior Plumbing In-Wall Rough In - North / West Elevation Exterior Electrical In-Wall Rough In - North / West Elevation Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 17 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 137 of 259 ends
Page 59 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
EX-9160 Install F.R.T Blocking - North / West Elevation 3 May-18-23 May-22-23 2 EX-2930 Install Rigid Insulation - North / West Elevation - North / West Elevation 5 May-25-23 Jun-01-23 0 EX-2870 Exterior Sheathing - North / West Elevation 5 Jun-02-23 Jun-08-23 0 EX-2950 Install F.R.T Ply wood - North / West Elevation 2 Jun-09-23 Jun-12-23 1 EX-3190 Install Metal / Aluminum Flashing - North / West Elevation 6 Jun-09-23 Jun-16-23 0 EX-2880 Air & Water Barrier - North / West Elevation 5 Jun-14-23 Jun-20-23 0 EX-8630 Install EPS Insulation EIFS System - North / West Elevation 4 Jun-21-23 Jun-26-23 0 EX-2900 Install Base Coat EIFS System - North / West Elevation 5 Jun-27-23 Jul-03-23 0 EX-8640 Install Finish Coat EIFS System - North / West Elevation 5 Jul-05-23 Jul-11-23 0 EX-8740 Install Garage Door - West / South Elevation 4 Jul-12-23 Jul-17-23 56 EX-5350 Install Composite Metal Panels - North / West Elevation 10 Jul-12-23 Jul-25-23 0 EX-2960 Install Hollow Metal Doors & Hardware - North / West Elevation 4 Jul-12-23 Jul-17-23 56 EX-5320 Install Rain Screen System - North / West Elevation 10 Jul-12-23 Jul-25-23 0 EX-4360 Exterior Ceramic Tile - North / West Elevation 20 Jul-19-23 Aug-15-23 0 EX-5340 Install Metal Coping - North / West Elevation 8 Jul-26-23 Aug-04-23 42 EX-2980 Remove Scaffolding - North / West Elevation 2 Aug-16-23 Aug-17-23 0 EX-2970 Paint Exterior Steel - North / West Elevation 5 Aug-18-23 Aug-24-23 17 EX-2910 Aluminum Framing at Storefront / Curtainwall - North / West Elevation 10 Aug-21-23 Sep-01-23 15 EX-5330 Install Exterior Lighting - North / West Elevation 8 Aug-25-23 Sep-06-23 17 EX-9140 Install Storefront Doors / Automatic Sliding Doors - North / West Elevation 5 Sep-05-23 Sep-11-23 17 EX-9170 Install Glazing at Storefront / Curtainwall - North / West Elevation 5 Sep-05-23 Sep-11-23 15 EX-2920 Exterior Signage - North / West Elevation 5 Sep-12-23 Sep-18-23 25 Main Entrance CanopyMain Entrance Canopy 23 May-18-23 Jun-20-23 71 EX-6660 Framing - Entrance Canopy 4 May-18-23 May-23-23 71 EX-6670 Rough-in Plumbing - Entrance Canopy 2 May-24-23 May-25-23 71 EX-7310 Rough-in Electrical - Entrance Canopy 2 May-24-23 May-25-23 71 EX-7570 Install F.R.T Ply wood Sheathing - Entrance Canopy 2 May-26-23 May-30-23 71 EX-7630 Install Air & Water Barrier - Entrance Canopy 2 May-31-23 Jun-01-23 71 EX-7900 Install Composite Metal Panel System 10 Jun-02-23 Jun-15-23 71 EX-7910 Install Light Fixtures - Entrance Canopy 3 Jun-16-23 Jun-20-23 71 West / South ElevationWest / South Elevation 98 May-08-23 Sep-25-23 24 EX-8650 Erect Exterior Scaffold System - West / South Elevation 5 May-08-23 May-12-23 0 EX-8660 Exterior Clips & Framing / Set HM Door Frames - West / South Elevation 10 May-15-23 May-26-23 0 EX-3010 Exterior Plumbing In-Wal l Rough In - West / South Elevation 5 May-30-23 Jun-05-23 0 EX-8670 Exterior Electrical In-Wal l Rough In - West / South Elevation 5 May-30-23 Jun-05-23 0 EX-9150 Install F.R.T Blocking - West / South Elevation 3 May-30-23 Jun-01-23 2 EX-8690 Install Rigid Insulation - West / South Elevation 5 Jun-06-23 Jun-12-23 0 EX-8680 Exterior Sheathing - West / South Elevation 5 Jun-13-23 Jun-19-23 0 EX-8700 Install Metal / Aluminum Flashing - West / South Elevation 8 Jun-20-23 Jun-29-23 0 EX-8710 Install F.R.T Ply wood - West / South Elevation 2 Jun-20-23 Jun-21-23 0 EX-8730 Air & Water Barrier - West / South Elevation 8 Jun-23-23 Jul-05-23 0 EX-8750 Install EPS Insulation EIFS System - West / South Elevation 4 Jul-06-23 Jul-11-23 0 EX-8720 Install Base Coat & Reinforcing Mesh EIFS System - West / South Elevation5 Jul-12-23 Jul-18-23 0 EX-8760 Install Finish Coat EIFS System - West / South Elevation 5 Jul-19-23 Jul-25-23 0 EX-8770 Install Rain Screen System - West / South Elevation 10 Jul-26-23 Aug-08-23 32 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Install F.R.T Blocking - North / West Elevation
Install Rigid Insulation - North / West Elevation - North / West Elevation Exterior Sheathing - North / West Elevation
Install F.R.T Ply wood - North / West Elevation
Install Metal / Aluminum Flashing - North / West Elevation Air & Water Barrier - North / West Elevation
Install EPS Insulation EIFS System - North / West Elevation Install Base Coat EIFS System - North / West Elevation
Install Finish Coat EIFS System - North / West Elevation Install Garage Door - West / South Elevation
Install Composite Metal Panels - North / West Elevation Install Hollow Metal Doors & Hardware - North / West Elevation Install Rain Screen System - North / West Elevation
Exterior Ceramic Tile - North / West Elevation
Install Metal Coping - North / West Elevation
Remove Scaffolding - North / West Elevation
Paint Exterior Steel - North / West Elevation
Aluminum Framing at Storefront / Curtainwall - North / West Elevation Install Exterior Lighting - North / West Elevation
Install Storefront Doors / Automatic Sliding Doors - North / West Elevation Install Glazing at Storefront / Curtainwall - North / West Elevation Exterior Signage - North / West Elevation
Framing - Entrance Canopy
Rough-in Plumbing - Entrance Canopy
Rough-in Electrical - Entrance Canopy
Install F.R.T Plywood Sheathing - Entrance Canopy
Install Air & Water Barrier - Entrance Canopy
Install Composite Metal Panel System
Install Light Fixtures - Entrance Canopy
Erect Exterior Scaffold System - West / South Elevation Exterior Clips & Framing / Set HM Door Frames - West / South Elevation Exterior Plumbing In-Wall Rough In - West / South Elevation Exterior Electrical In-Wall Rough In - West / South Elevation Install F.R.T Blocking - West / South Elevation
Install Rigid Insulation - West / South Elevation
Exterior Sheathing - West / South Elevation
Install Metal / Aluminum Flashing - West / South Elevation Install F.R.T Ply wood - West / South Elevation
Air & Water Barrier - West / South Elevation
Install EPS Insulation EIFS System - West / South Elevation Install Base Coat & Reinforcing Mesh EIFS System - West / South Elevation Install Finish Coat EIFS System - West / South Elevation Install Rain Screen System - West / South Elevation
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 18 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 138 of 259 ends
Page 60 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
EX-8820 Exterior Ceramic Tile - West / South Elevation 10 Jul-26-23 Aug-08-23 0 EX-8790 Install Hollow Metal Doors & Hardware - West / South Elevation 6 Jul-26-23 Aug-02-23 44 EX-5300 Install Roll Up Doors - West / South Elevation 10 Jul-26-23 Aug-08-23 40 EX- 9110 Remove Scaffolding - West / South Elevation 2 Aug-09-23 Aug-10-23 0 EX-8810 Install Metal Coping - West / South Elevation 8 Aug-09-23 Aug-18-23 32 EX-8840 Paint Exterior Steel - West / South Elevation 5 Aug-11-23 Aug-17-23 25 EX-8800 Install Exterior Lighting - West / South Elevation 5 Aug-18-23 Aug-24-23 25 EX-8780 Aluminum Framing at Storefronts / Curtainwall - West / South Elevation 15 Aug-21-23 Sep-11-23 7 EX-8830 Exterior Signage - West / South Elevation 5 Sep-12-23 Sep-18-23 29 EX-9200 Install Glazing at Storefront / Curtainwall - West / South Elevation 10 Sep-12-23 Sep-25-23 7 Rooftop BuildoutRooftop Buildout 118 Apr-19-23 Oct-04-23 12 South Rooftop BuildoutSouth Rooftop Buildout 111 Apr-28-23 Oct-04-23 12 EX-6960 Layout HVAC Curbs & Equipment Penetrations - K to A Line - Roof 3 Apr-28-23 May-02-23 12 EX-6920 Rough-in Mechanical Pipe Stub-Ups - K to A Line - Roof 3 Apr-28-23 May-02-23 15 EX-6930 Frame Parapet Wall s - K to A Line - Roof 5 Apr-28-23 May-04-23 10 EX-6990 Wood Blocking at T Li ne Roof Edge - K to A Line - Roof 3 Apr-28-23 May-02-23 18 EX-3030 Rough-in Electrical Conduit Stub-Ups - K to A Line - Roof 3 May-03-23 May-05-23 12 EX-3040 Rough-in Plumbing Pipe Stub-Ups - K to A Line - Roof 3 May-03-23 May-05-23 12 EX-6970 Install Roof Drains & Leaders - K to A Line - Roof 3 May-03-23 May-05-23 12 EX-8950 F.R.T Plywood Sheathing at Parapet Walls - K to A Line - Roof 3 May-05-23 May-09-23 10 EX-7080 Install Rigid Insulation - K to A Line - Roof 3 May-10-23 May-12-23 10 EX-6940 Install TPO Roofing System - K to A Line - Roof 7 May-15-23 May-23-23 10 EX-6950 Install Sheet Metal Coping Cap & Mech Pad Covers - K to A Line - Roof 2 May-24-23 May-25-23 79 EX-7050 Set & Anchor Roof Mechanical Equipment - K to A Line - Roof 3 Sep-19-23 Sep-21-23 0 EX-7060 Rough-in Mechanical to Roof Equipment - K to A Line - Roof 3 Sep-22-23 Sep-26-23 0 EX-8960 Rough-in Electrical to Roof Equipment - Roof 3 Sep-27-23 Sep-29-23 0 EX-7090 Install Equipment Walkway Pads - K to A Line - Roof 3 Oct-02-23 Oct-04-23 12 North Rooftop BuildoutNorth Rooftop Buildout 118 Apr-19-23 Oct-04-23 12 EX-9240 Frame Parapet Wall s - U to K Li ne - Roof 4 Apr-19-23 Apr-24-23 18 EX-9250 Wood Blocking at T Li ne Roof Edge - U to K Line - Roof 3 Apr-19-23 Apr-21-23 25 EX-9260 Layout HVAC Curbs & Equipment Penetrations - U to K Line - Roof 3 Apr-21-23 Apr-25-23 17 EX-9270 F.R.T Plywood Sheathing at Parapet Walls - U to K Line - Roof 3 Apr-25-23 Apr-27-23 18 EX-9280 Rough-in Electrical Conduit Stub-Ups - U to K Line - Roof 3 Apr-26-23 Apr-28-23 17 EX-9290 Rough-in Plumbing Pipe Stub-Ups - U to K Line - Roof 3 Apr-26-23 Apr-28-23 17 EX-9310 Install Roof Drains & Leaders - U to K Line - Roof 3 Apr-26-23 Apr-28-23 17 EX-9300 Rough-in Mechanical Pipe Stub-Ups - U to K Line - Roof 3 Apr-26-23 Apr-28-23 17 EX-9320 Install Rigid Insulation - U to K Line - Roof 3 May-01-23 May-03-23 17 EX-9330 Install TPO Roofing System - U to K Line - Roof 7 May-04-23 May-12-23 17 EX-9340 Install Sheet Metal Coping Cap & Mech Pad Covers - U to K Line - Roof 2 May-15-23 May-16-23 98 EX-9350 Set & Anchor Roof Mechanical Equipment - U to K Line - Roof 3 Sep-19-23 Sep-21-23 12 EX-9360 Rough-in Mechanical to Roof Equipment - U to K Line - Roof 3 Sep-22-23 Sep-26-23 12 EX-9370 Rough-in Electrical to Roof Equipment - Roof 3 Sep-27-23 Sep-29-23 12 EX-2370 Start-Up Air Handling Units (AHU) - U to A Line - Roof 1 Oct-02-23 Oct-02-23 0 EX-9380 Install Equipment Walkway Pads - U to K Line - Roof 3 Oct-02-23 Oct-04-23 12 Upper Level Pie Shape Roof at 10/G.7Upper Level Pie Shape Roof at 10/G.7 6 Jun-22-23 Jun-29-23 0 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Exterior Ceramic Tile - West / South Elevation
Install Hollow Metal Doors & Hardware - West / South Elevation Install Roll Up Doors - West / South Elevation
Remove Scaffolding - West / South Elevation
Install Metal Coping - West / South Elevation
Paint Exterior Steel - West / South Elevation
Install Exterior Lighting - West / South Elevation
Aluminum Framing at Storefronts / Curtainwall - West / South Elevation Exterior Signage - West / South Elevation
Install Glazing at Storefront / Curtainwall - West / South Elevation Layout HVAC Curbs & Equipment Penetrations - K to A Line - Roof Rough-in Mechanical Pipe Stub-Ups - K to A Line - Roof Frame Parapet Walls - K to A Line - Roof
Wood Blocking at T Li ne Roof Edge - K to A Line - Roof Rough-in Electrical Conduit Stub-Ups - K to A Line - Roof Rough-in Plumbing Pipe Stub-Ups - K to A Line - Roof
Install Roof Drains & Leaders - K to A Line - Roof
F.R.T Plywood Sheathing at Parapet Walls - K to A Line - Roof Install Rigid Insulation - K to A Line - Roof
Install TPO Roofing System - K to A Line - Roof
Install Sheet Metal Coping Cap & Mech Pad Covers - K to A Line - Roof Set & Anchor Roof Mechanical Equipment - K to A Line - Roof Rough-in Mechanical to Roof Equipment - K to A Line - Roof Rough-in Electrical to Roof Equipment - Roof
Install Equipment Walkway Pads - K to A Line - Roof
Frame Parapet Walls - U to K Line - Roof
Wood Blocking at T Line Roof Edge - U to K Line - Roof Layout HVAC Curbs & Equipment Penetrations - U to K Line - Roof F.R.T Plywood Sheathing at Parapet Walls - U to K Line - Roof Rough-in Electrical Conduit Stub-Ups - U to K Line - Roof Rough-in Plumbing Pipe Stub-Ups - U to K Line - Roof
Install Roof Drains & Leaders - U to K Line - Roof
Rough-in Mechanical Pipe Stub-Ups - U to K Line - Roof Install Rigid Insulation - U to K Line - Roof
Install TPO Roofing System - U to K Line - Roof
Install Sheet Metal Coping Cap & Mech Pad Covers - U to K Line - Roof Set & Anchor Roof Mechanical Equipment - U to K Line - Roof Rough-in Mechanical to Roof Equipment - U to K Line - Roof Rough-in Electrical to Roof Equipment - Roof
Start-Up Air Handling Units (AHU) - U to A Line - Roof
Install Equipment Walkway Pads - U to K Line - Roof
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 19 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 139 of 259 ends
Page 61 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
EX-9650 Install Flashings - Pie Shaped Roof 1 Jun-22-23 Jun-22-23 0 EX-9210 Install Roof Drains & Leaders - Pie Shaped Roof 2 Jun-23-23 Jun-26-23 0 EX-9220 Install Rigid Insulation - Pie Shaped Roof 1 Jun-27-23 Jun-27-23 0 EX-9230 Install TPO Roofing System - Pie Shaped Roof 2 Jun-28-23 Jun-29-23 0 East Hitting Bay Exterior Wall @ 7 LineEast Hitting Bay Exterior Wall @ 7 Line 84 May-15-23 Sep-12-23 16 Lower LevelLower Level 53 Jun-22-23 Sep-06-23 20
EX-8850 Exterior Framing / Set HM Door Frames - Lower Level Hitting Bay 8 Jun-22-23 Jul-03-23 6 EX-3020 Exterior Plumbing In-Wal l Rough In - Lower Level Hit ting B ay 5 Jul-05-23 Jul-11-23 6 EX-8860 Exterior Electrical In-Wal l Rough In - Lower Level Hit ting B ay 5 Jul-05-23 Jul-11-23 6 EX-8870 Exterior Sheathing - Lower Level Hitting Bay 5 Jul-12-23 Jul-18-23 6 EX-8880 Install Flashing - Lower Level Hitting Bay 5 Jul-19-23 Jul-25-23 6 EX-8890 Air & Wa ter Bar r i er - L ower Le v el Hi tti ng Bay5 Jul-26-23 Aug-01-23 6 EX-8910 Install EPS Insulation EIFS System - Lower Level Hitting Bay 5 Aug-02-23 Aug-08-23 6 EX-8900 Install Base Coat EIFS System - Lower Level Hitting Bay 5 Aug-09-23 Aug-15-23 6 EX-8920 Install Finish Coat EIFS System - Lower Level Hitting Bay 5 Aug-16-23 Aug-22-23 6 EX-3160 Sliding Door System - Lower Level Hitting Bay 5 Aug-23-23 Aug-29-23 25 EX-8930 Ribbon Windows - Lower Level Hitting Bay 5 Aug-23-23 Aug-29-23 20 EX-8940 Exterior Lighting - Lower Level Hitting Bay 5 Aug-23-23 Aug-29-23 22 EX-3070 Storefronts - Lower Level Hitting Bay 10 Aug-23-23 Sep-06-23 20 Middle LevelMiddle Level 53 Jun-28-23 Sep-12-23 16
EX-9390 Exterior Framing / Set HM Door Frames - Middle Level Hitting Bay 8 Jun-28-23 Jul-10-23 2 EX-9400 Exterior Plumbing In-Wal l Rough In - Mi ddl e Level Hit t in g Ba y 5 Jul-11-23 Jul-17-23 2 EX-9410 Exterior Electrical In-Wal l Rough In - Mi ddl e Level Hi tti ng Bay 5 Jul-11-23 Jul-17-23 2 EX-9420 Exterior Sheathing - Middle Level Hitting Bay 5 Jul-18-23 Jul-24-23 2 EX-9430 Install Flashing - Middle Level Hitting Bay 5 Jul-25-23 Jul-31-23 2 EX-9440 Air & Water Barrier - Middle Level Hitting Bay 5 Aug-01-23 Aug-07-23 2 EX-9450 Install EPS Insulation EIFS System - Middle Level Hitting Bay 5 Aug-08-23 Aug-14-23 2 EX-9460 Install Base Coat EIFS System - Middle Level Hitting Bay 5 Aug-15-23 Aug-21-23 2 EX-9470 Install Finish Coat EIFS System - Middle Level Hitting Bay 5 Aug-22-23 Aug-28-23 2 EX-9500 Sliding Door System - Middle Level Hitting Bay 5 Aug-29-23 Sep-05-23 3 EX-9480 Ribbon Windows - Middle Level Hitting Bay 5 Aug-29-23 Sep-05-23 16 EX-9490 Exterior Lighting - Middle Level Hitting Bay 5 Aug-29-23 Sep-05-23 18 EX-9510 Storefronts - Middle Level Hitting Bay 10 Aug-29-23 Sep-12-23 16 Upper LevelUpper Level 63 May-15-23 Aug-11-23 37
EX-9520 Exterior Framing / Set HM Door Frames - Upper Level Hitting Bay 8 May-15-23 May-24-23 33 EX-9530 Exterior Plumbing In-Wal l Rough In - Upper Level Hit ting B ay 5 May-25-23 Jun-01-23 33 EX-9540 Exterior Electrical In-Wal l Rough In - Upper Level Hit ting B ay 5 May-25-23 Jun-01-23 33 EX-9550 Exterior Sheathing - Upper Level Hitting Bay 5 Jun-02-23 Jun-08-23 33 EX-9560 Install Flashing - Upper Level Hitting Bay 5 Jun-09-23 Jun-15-23 33 EX-9570 Air & Wa ter Bar r i er - Up per Le v el Hi tti ng Bay5 Jun-16-23 Jun-22-23 33 EX-9580 Install EPS Insulation EIFS System - Upper Level Hitting Bay 5 Jun-23-23 Jun-29-23 33 EX-9590 Install Base Coat EIFS System - Upper Level Hitting Bay 5 Jun-30-23 Jul-07-23 33 EX-9600 Install Finish Coat EIFS System - Upper Level Hitting Bay 5 Jul-10-23 Jul-14-23 33 EX-9620 Ribbon Windows - Upper Level Hitting Bay 5 Jul-17-23 Jul-21-23 47 EX-9630 Exterior Lighting - Upper Level Hitting Bay 5 Jul-17-23 Jul-21-23 49 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Install Flashings - Pie Shaped Roof
Install Roof Drains & Leaders - Pie Shaped Roof
Install Rigid Insulation - Pie Shaped Roof
Install TPO Roofing System - Pie Shaped Roof
Exterior Framing / Set HM Door Frames - Lower Level Hitting Bay Exterior Plumbing In-Wall Rough In - Lower Level Hit ting B ay Exterior Electrical In-Wall Rough In - Lower Level Hit ting B ay Exterior Sheathing - Lower Level Hitting Bay
Install Flashing - Lower Level Hitting Bay
Air & Water Barrier - Lower Level Hitting Bay
Install EPS Insulation EIFS System - Lower Level Hitting Bay Install Base Coat EIFS System - Lower Level Hitting Bay Install Finish Coat EIFS System - Lower Level Hitting Bay Sliding Door System - Lower Level Hitting Bay
Ribbon Windows - Lower Level Hitting Bay
Exterior Lighting - Lower Level Hitting Bay
Storefronts - Lower Level Hitting Bay
Exterior Framing / Set HM Door Frames - Middle Level Hitting Bay Exterior Plumbing In-Wall Rough In - Middle Lev el Hit t in g Ba y Exterior Electrical In-Wal l Rough In - Mi ddl e Lev el Hi tti ng Bay Exterior Sheathing - Middle Level Hitting Bay
Install Flashing - Middle Level Hitting Bay
Air & Water Barrier - Middle Level Hitting Bay
Install EPS Insulation EIFS System - Middle Level Hitting Bay Install Base Coat EIFS System - Middle Level Hitting Bay Install Finish Coat EIFS System - Middle Level Hitting Bay Sliding Door System - Middle Level Hitting Bay
Ribbon Windows - Middle Level Hitting Bay
Exterior Lighting - Middle Level Hitting Bay
Storefronts - Middle Level Hitting Bay
Exterior Framing / Set HM Door Frames - Upper Level Hitting Bay Exterior Plumbing In-Wall Rough In - Upper Level Hit ting B ay Exterior Electrical In-Wall Rough In - Upper Level Hit ting B ay Exterior Sheathing - Upper Level Hitting Bay
Install Flashing - Upper Level Hitting Bay
Air & Wa ter Bar r i er - Up per Le v el Hi tti ng Bay Install EPS Insulation EIFS System - Upper Level Hitting Bay Install Base Coat EIFS System - Upper Level Hitting Bay Install Finish Coat EIFS System - Upper Level Hitting Bay Ribbon Windows - Upper Level Hitting Bay
Exterior Lighting - Upper Level Hitting Bay
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 20 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 140 of 259 ends
Page 62 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
EX-9610 Sliding Door System - Upper Level Hitting Bay 5 Jul-24-23 Jul-28-23 47 EX-9640 Storefronts - Upper Level Hitting Bay 10 Jul-31-23 Aug-11-23 37 Lower Level Outdoor Patio #025Lower Level Outdoor Patio #025 193 Dec-29-22 Sep-29-23 15 EX-1810 Rough-in Underground Plumbing - Outdoor Patio 3 Dec-29-22 Jan-03-23 177 EX-1820 Rough-in Underground Electrical - Outdoor Patio 3 Jan-04-23 Jan-06-23 177 EX-1690 Erect & Weld Steel at Canopy - Outdoor Patio 5 Mar-10-23 Mar-16-23 123 EX-1720 Form Retaining Wall & Bench - Outdoor Patio 2 Aug-18-23 Aug-21-23 15 EX-1730 Rebar Retaining Wall & Bench - Outdoor Patio 2 Aug-22-23 Aug-23-23 15 EX-1740 Pour Retaining Wal l & Bench - Outdoor Patio 1 Aug-24-23 Aug-24-23 15 EX-1830 Form Slab - Outdoor Patio 2 Aug-25-23 Aug-28-23 15 EX-1840 Rebar Slab - Outdoor Patio 2 Aug-29-23 Aug-30-23 15 EX-1850 Pour Slab - Outdoor Patio 1 Aug-31-23 Aug-31-23 15 EX-1710 Install Aluminum Fence & Gates - Outdoor Patio 8 Sep-01-23 Sep-13-23 15 EX-1750 Install IPE Wood at Canopy - Outdoor Patio 6 Sep-01-23 Sep-11-23 22 EX-1760 Install Fans at Canopy - Outdoor Patio 2 Sep-12-23 Sep-13-23 22 EX-1700 Install Turf - Outdoor Patio (by Owner) 5 Sep-14-23 Sep-20-23 15 EX-1770 Install Planters - Outdoor Patio 2 Sep-21-23 Sep-22-23 15 EX-1800 Rough-in Irrigation - Outdoor Patio 2 Sep-21-23 Sep-22-23 15 EX-1790 Landscaping - Outdoor Patio 5 Sep-25-23 Sep-29-23 15 Middle Level Outdoor Terrace #122Middle Level Outdoor Terrace #122 17 Aug-18-23 Sep-12-23 13 EX-1960 Seal Concrete - Outdoor Terrace 2 Aug-18-23 Aug-21-23 13 EX-1940 Install Glass Railing System - Outdoor T errace 10 Aug-22-23 Sep-05-23 13 EX-1950 Install Light Fixtures into Slab - Outdoor Terrace 5 Sep-06-23 Sep-12-23 13 Upper Level Roof Terrace #217Upper Level Roof Terrace #217 30 Aug-18-23 Sep-29-23 0 EX-7700 Install Glass Railing Posts - Roof Terrace 5 Aug-18-23 Aug-24-23 0 EX-6840 Install Insulation - Roof T errace 2 Aug-25-23 Aug-28-23 0 EX-1970 Apply Surface Conditioner Coating - Roof Terrace 2 Aug-29-23 Aug-30-23 0 EX-6830 Install Flex Flash Reinforcement / Hydrodrain - Roof Terrace 2 Aug-31-23 Sep-01-23 0 EX-9120 Install Flashing (Break Metal) - Roof Terr ace 2 Sep-05-23 Sep-06-23 0 EX-6850 Hydrotech Pedestal System - Roof Terrace 5 Sep-07-23 Sep-13-23 0 EX-6870 Install Floor Tile - Roof Terrace 5 Sep-14-23 Sep-20-23 0 EX-6880 Install Glazing - Roof Terrace 5 Sep-21-23 Sep-27-23 0 EX-9130 Install LED Lighting - Roof Terrace 2 Sep-28-23 Sep-29-23 0 Interior BuildoutInterior Buildout 127 Jun-07-23 Dec-07-23 15 Lower LevelLower Level 127 Jun-07-23 Dec-07-23 15
Rough-InsRough-Ins 56 Jun-07-23 Aug-24-23 11
IN-3897 Rough-in Storm Drain / Waste & Vent - Lower Level 8 Jun-07-23 Jun-16-23 1 IN-3001 Rough-in Overhead Fire Sprinkler - Lower Level 8 Jun-07-23 Jun-16-23 0 IN-3205 Rough-in Overhead Mechanical - Lower Level 8 Jun-08-23 Jun-19-23 0 IN-3306 Rough-in Overhead Plumbing - Lower Level 8 Jun-09-23 Jun-20-23 0 IN-3103 Rough-in Overhead Electrical - Lower Level 8 Jun-12-23 Jun-21-23 0 IN-10000 Rough-in Overhead Fire Alarm - Lower Level 8 Jun-12-23 Jun-21-23 0 IN-7270 Plumbing Drip Pans & Sensor at Bar Ceiling - Lower Level 3 Jun-16-23 Jun-20-23 1 IN-7000 Drill & Epoxy Rebar Dowels - Bar - Lower Level 2 Jun-19-23 Jun-20-23 20 IN-7010 Form Curbs - Bar - Lower Level 1 Jun-21-23 Jun-21-23 20 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Sliding Door System - Upper Level Hitting Bay
Storefronts - Upper Level Hitting Bay
Rough-in Underground Plumbing - Outdoor Patio
Rough-in Underground Electrical - Outdoor Patio
Erect & Weld Steel at Canopy - Outdoor Patio
Form Retaining Wall & Bench - Outdoor Patio
Rebar Retaining Wall & Bench - Outdoor Patio
Pour Retaining Wall & Bench - Outdoor Patio
Form Slab - Outdoor Patio
Rebar Slab - Outdoor Patio
Pour Slab - Outdoor Patio
Install Aluminum Fence & Gates - Outdoor Patio
Install IPE Wood at Canopy - Outdoor Patio
Install Fans at Canopy - Outdoor Patio
Install Turf - Outdoor Patio (by Owner)
Install Planters - Outdoor Patio
Rough-in Irrigation - Outdoor Patio
Landscaping - Outdoor Patio
Seal Concrete - Outdoor Terrace
Install Glass Railing System - Outdoor T errace
Install Light Fixtures into Slab - Outdoor Terrac e
Install Glass Railing Posts - Roof Terrace
Install Insulation - Roof T errace
Apply Surface Conditioner Coating - Roof Terrace
Install Flex Flash Reinforcement / Hydrodrain - Roof Terrace Install Flashing (Break Metal) - Roof Terrace
Hydrotech Pedestal System - Roof Terrace
Install Floor Tile - Roof Terrace
Install Glazing - Roof Terrace
Install LED Lighting - Roof Terrac e
Rough-in Storm Drain / Waste & Vent - Lower Level
Rough-in Overhead Fire Sprinkler - Lower Level
Rough-in Overhead Mechanical - Lower Level
Rough-in Overhead Plumbing - Lower Level
Rough-in Overhead Electrical - Lower Level
Rough-in Overhead Fire Alarm - Lower Level
Plumbing Drip Pans & Sensor at Bar Ceiling - Lower Level Drill & Epoxy Rebar Dowels - Bar - Lower Level
Form Curbs - Bar - Lower Level
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 21 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 141 of 259 ends
Page 63 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
IN-3902 Frame Wal ls & Ceil ings / Soffits - Lower Level 10 Jun-22-23 Jul-06-23 0 IN-7020 Pour Curbs - Bar - Lower Level 1 Jun-22-23 Jun-22-23 20 IN-5001 In Wall El ectrical - Lower Level 7 Jul-07-23 Jul-17-23 0 IN-5350 In Wall Pl umbing - Lower Level 7 Jul-07-23 Jul-17-23 0 IN-10010 In Wall Fi re Alarm - Lower Level 7 Jul-07-23 Jul-17-23 0 IN-5410 Wall Vapor Barrier at Computer Room - Lower Level 4 Jul-14-23 Jul-19-23 2 IN-5360 Install Backing & Blocking - Lower Level 4 Jul-18-23 Jul-21-23 0 IN-5370 Install Insulation - Lower Level 2 Jul-24-23 Jul-25-23 0 OFOI-11640 Install Beer Tubes (by Owner) - Bar - Lower Level 2 Jul-24-23 Jul-25-23 0 OFOI-11650 Install Soda Tubes (by Owner) - Bar - Lower Level 1 Jul-24-23 Jul-24-23 1 IN-5380 Hang Drywall @ Wall s & Cei li ngs - Lower Level 5 Jul-26-23 Aug-01-23 0 IN-3985 F.R.T Plywood @ Ceilings - Lower Lev el 5 Jul-26-23 Aug-01-23 7 IN-5390 Drywall Taping - Lower Level 7 Aug-02-23 Aug-10-23 0 IN-5400 Prime & 1st Coat Paint - Lower Level 5 Aug-11-23 Aug-17-23 0 IN-5110 Paint Ceiling - Hitting Bay - Lower Level 10 Aug-11-23 Aug-24-23 11 FinishesFinishes 127 Jun-07-23 Dec-07-23 15
Lobby & Bar #002, 005, 006Lobby & Bar #002, 005, 006 83 Jun-23-23 Oct-19-23 17 IN-7290 Field Measure & Procure Granite Curbs - Lobby & Bar - Lower Level 15 Jun-23-23 Jul-14-23 26 IN-7300 Frame ADA Counter Wall - Bar - Lower Level 2 Jun-23-23 Jun-26-23 20 IN-3607 Install F.R.T. Plywood @ Walls - Lobby & Bar - Lower Level 2 Jul-26-23 Jul-27-23 0 IN-7260 Urethane Flooring - Lobby & Bar - Lower Level 7 Jul-28-23 Aug-07-23 0 IN-10150 Install Fiberglass Reinforced Plastic Panel - Lobby & Bar - Lower Level 5 Aug-08-23 Aug-14-23 0 IN-4002 Install Granite Countertops & Curb - Lobby & Bar - Lower Level 5 Aug-15-23 Aug-21-23 0 IN-3909 Install Porcelain Tile - Lobby & Bar - Lower Level 5 Aug-22-23 Aug-28-23 0 IN-3500 Hang Doors & Hardware - Lobby & Bar - Lower Level 3 Aug-29-23 Aug-31-23 27 IN-4803 Install Composite Facade Panel - Lobby & Bar - Lower Level 5 Aug-29-23 Sep-05-23 0 IN-3970 Install Air Curtain - Lobby & Bar - Lower Level 4 Aug-30-23 Sep-05-23 49 IN-4001 Install Wood Paneling & Base - Lobby & Bar - Lower Level 5 Sep-06-23 Sep-12-23 0 IN-4103 Install Reception Desk - Lobby & Bar - Lower Level 5 Sep-13-23 Sep-19-23 10 IN-4206 Install Wood Ceiling Panels - Lobby & Bar - Lower Level 8 Sep-13-23 Sep-22-23 0 IN-4302 Install Wal l Coverings - Lobby & Bar - Lower Lev el 5 Sep-13-23 Sep-19-23 15 IN-4202 Install Perforated Metal - Lobby & Bar - Lower Level 5 Sep-20-23 Sep-26-23 10 IN-4402 Install Light Fixtures / Fire Alarm Trim - Lobby & Bar - Lower Level 5 Sep-25-23 Sep-29-23 0 IN-3860 Install Air Diffusers - Lobby & Bar - Lower Level 5 Sep-25-23 Sep-29-23 1 IN-3980 Paint Touch-Up - Lobby & Bar - Lower Level 2 Oct-02-23 Oct-03-23 7 IN-9950 Remove Protection & Final Polish Concrete - Lobby & Bar - Lower Level 4 Oct-02-23 Oct-05-23 5 OFOI-1520 Signage (By Owner) - Lobby & Bar - Lower Level 10 Oct-06-23 Oct-19-23 6 OFOI-1550 Television (By Owner) - Lobby & Bar - Lower Level 10 Oct-06-23 Oct-19-23 6 OFOI-1560 Custom Graphics (by Owner) - Lobby & Bar - Lower Level 10 Oct-06-23 Oct-19-23 6 OFOI-1580 Retail Fixture Display System (By Owner) - Lobby & Bar - Lower Level 10 Oct-06-23 Oct-19-23 6 OFOI-1600 Custom Wood Planter (By Owner) - Lobby & Bar - Lower Level 10 Oct-06-23 Oct-19-23 6 OFOI-1330 Bar Equipment (By Owner) - Lobby & Bar - Lower Level 10 Oct-06-23 Oct-19-23 5 Office / Employee Locker / Work Room / Safe RoomOffice / Employee Locker / Work Room / Safe Room 29 Aug-18-23 Sep-28-23 21 IN-7160 Interior Glazing - Office / Employee Locker / Work Room / Safe Room - Lower Level5 Aug-18-23 Aug-24-23 21 IN-7170 Install P.Lam Countertop & Millwork Wood Cap - Office / Employee Locker / Work Room / Safe Room - Lower Level5 Aug-18-23 Aug-24-23 21 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Frame Walls & Ceilings / Soffits - Lower Level
Pour Curbs - Bar - Lower Level
In Wal l El ectri c al - Lo wer Lev el
In Wall Plumbing - Lower Level
In Wall F ire Alarm - Lower Level
Wall Vapor Barrier at Computer Room - Lower Level
Install Backing & Blocking - Lower Level
Install Insulation - Lower Level
Install Beer Tubes (by Owner) - Bar - Lower Level
Install Soda Tubes (by Owner) - Bar - Lower Level
Hang Drywall @ Wall s & Cei li ngs - Lower Level
F.R.T Plywood @ Ceilings - Lower Level
Drywall Taping - Lower Level
Prime & 1st Coat Paint - Lower Level
Paint Ceiling - Hitting Bay - Lower Level
Field Measure & Procure Granite Curbs - Lobby & Bar - Lower Level Frame ADA Counter Wall - Bar - Lower Level
Install F.R.T. Plywood @ Walls - Lobby & Bar - Lower Level Urethane Flooring - Lobby & Bar - Lower Level
Install Fiberglass Reinforced Plastic Panel - Lobby & Bar - Lower Level Install Granite Countertops & Curb - Lobby & Bar - Lower Level Install Porcelain Tile - Lobby & Bar - Lower Level
Hang Doors & Hardware - Lobby & Bar - Lower Level
Install Composite Facade Panel - Lobby & Bar - Lower Level Install Air Curtain - Lobby & Bar - Lower Level
Install Wood Paneling & Base - Lobby & Bar - Lower Level Install Reception Desk - Lobby & Bar - Lower Level
Install Wood Ceiling Panels - Lobby & Bar - Lower Level Install Wall Coverings - Lobby & Bar - Lower Level
Install Perforated Metal - Lobby & Bar - Lower Level
Install Light Fixtures / Fire Alarm Trim - Lobby & Bar - Lower Level Install Air Diffusers - Lobby & Bar - Lower Level
Paint Touch-Up - Lobby & Bar - Lower Level
Remove Protection & Final Polish Concrete - Lobby & Bar - Lower Level Signage (By Owner) - Lobby & Bar - Lower Level
Television (By Owner) - Lobby & Bar - Lower Level
Custom Graphics (by Owner) - Lobby & Bar - Lower Level
Retail Fixture Display System (By Owner) - Lobby & Bar - Lower Level Custom Wood Planter (By Owner) - Lobby & Bar - Lower Level Bar Equipment (By Owner) - Lobby & Bar - Lower Level
Interior Glazing - Office / Employee Locker / Work Room / Safe Room - Lower Level Install P.Lam Countertop & Millwork Wood Cap - Office / Employee Locker / Work Room / Safe Room - Lower Level Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 22 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 142 of 259 ends
Page 64 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
IN-7180 Install Ceiling Grid - Office / Employee Locker / Work Room / Safe Room - Lower Level5 Aug-18-23 Aug-24-23 25 IN-7230 Install Carpet - Office / Employee Locker / Work Room / Safe Room - Lower Level4 Aug-25-23 Aug-30-23 21 IN-7120 Install Base - Office / Employee Locker / Work Room / Safe Room - Lower Level2 Aug-31-23 Sep-01-23 24 IN-7150 Install Wall Mounted Mirror - Office / Employee Locker / Work Room / Safe Room - Lower Level2 Aug-31-23 Sep-01-23 27 IN-7200 Install Light Fixtures / Fire Alarm Trim - Offic e / Employee Locker / Work Room / Safe Room - Lower Level5 Aug-31-23 Sep-07-23 21 IN-7210 Mechanical Trim - Office / Employee Locker / Work Room / Safe Room - Lower Level5 Aug-31-23 Sep-07-23 21 IN-7250 Install Fire Sprinkler Heads - Office / Employee Locker / Work Room / Safe Room - Lower Level5 Aug-31-23 Sep-07-23 21 IN-7140 Hang Doors & Hardware - Office / Employee Locker / Work Room / Safe Room - Lower Level3 Sep-05-23 Sep-07-23 24 IN-7190 Install Ceiling Tile - Office / Employee Locker / Work Room / Safe Room - Lower Level3 Sep-08-23 Sep-12-23 21 IN-7220 Electrical Trim - Office / Employee Locker / Work Room / Safe Room - Lower Level3 Sep-08-23 Sep-12-23 21 IN-10020 Fire Alarm Trim - Office / Employee Locker / Work Room / Safe Room - Lower Level3 Sep-08-23 Sep-12-23 21 IN-7130 Paint Touch-Up - Office / Employee Locker / Work Room / Safe Room - Lower Level2 Sep-13-23 Sep-14-23 21 OFOI-11610Install Copier (By Owner) - Office / Employee Locker / Work Room / Safe Room - Lower Level10 Sep-15-23 Sep-28-23 21 OFOI-11620Employee Lockers (By Owner) - Office / Employee Locker / Work Room / Safe Room - Lower Level10 Sep-15-23 Sep-28-23 21 OFOI-11630Safe (By Owner) - Office / Employee Locker / Work Room / Safe Room - Lower Level10 Sep-15-23 Sep-28-23 21 Main Electrical Room #21Main Electrical Room #21 39 Jun-07-23 Aug-01-23 3 IN-6580 Layout & Form Equipment Pads - Electrical Room - Lower Level 2 Jun-07-23 Jun-08-23 2 IN-6590 Drill & Epoxy Rebar for Equipment Pads - Electrical Room - Lower Level 2 Jun-08-23 Jun-09-23 2 IN-6600 Pour Equipment Pads - Electrical Room - Lower Level 1 Jun-12-23 Jun-12-23 2 IN-6610 Strip & Clean Equipment Pads - Electrical Room - Lower Level 1 Jun-13-23 Jun-13-23 2 IN-4680 Frame Wal ls - Electri c al Room - Lower Lev el 4 Jun-14-23 Jun-19-23 2 IN-4690 In Wall El ectrical - Electri c al Room - Lower Level 4 Jun-20-23 Jun-23-23 6 IN-4710 Install Backing & Blocking - Electrical Room - Lower Level 2 Jun-26-23 Jun-27-23 6 IN-4730 Hang Drywall - Electrical Room - Lower Level 2 Jun-30-23 Jul-03-23 4 IN-4740 Drywall Taping - Electri cal Room - Lower Level 4 Jul-05-23 Jul-10-23 4 IN-4750 Prime & 1st Coat Paint - Electrical Room - Lower Level 2 Jul-11-23 Jul-12-23 4 IN-6630 Set Electrical Panels - Electrical Room - Lower Level 3 Jul-13-23 Jul-17-23 4 IN-6620 Set & Anchor Electrical Equipment - Electrical Room - Lower Level 2 Jul-18-23 Jul-19-23 3 IN-6650 Rough-in Electrical Conduits to Panels / Equipment - Electrical Room - Lower Level2 Jul-19-23 Jul-20-23 3 IN-6640 Hang Door & Hardware - Electrical Room - Lower Level 3 Jul-20-23 Jul-24-23 7 IN-6660 Pull Wire & T erminate Electrical - Electrical Room - Lower Level 2 Jul-20-23 Jul-21-23 3 IN-1420 Install Mechanical Trim - Electrical Room - Lower Level 2 Jul-20-23 Jul-21-23 6 IN-10030 Install Fire Alarm Trim - Electrical Room - Lower Level 2 Jul-20-23 Jul-21-23 5 IN-6670 Install Light Fixtures - Electrical Room - Lower Level 2 Jul-24-23 Jul-25-23 3 IN-6700 Seal Concrete - Electrical Room - Lower Level 1 Jul-26-23 Jul-26-23 3 IN-6710 Install Vinyl Base - Electrical Room - Lower Level 2 Jul-27-23 Jul-28-23 3 IN-6680 Paint Touch-Up - Electrical Room - Lower Level 1 Jul-31-23 Jul-31-23 3 IN-6690 Ready T o Be Energiz ed - El ectrical Room - Lower Level 0 Jul-31-23 3 IN-10390 AHJ Inspection - Electrical Room - Lower Level 1 Aug-01-23 Aug-01-23 3 Computer Room #016Computer Room #016 77 Jun-14-23 Oct-02-23 30 IN-4880 Frame Wal ls - Computer Room - Lower Lev el 4 Jun-14-23 Jun-19-23 2 IN-4890 In Wall El ectrical - C omp ut er Ro om - Lowe r L eve l 4 Jun-20-23 Jun-23-23 2 IN-4900 Install Backing & Blocking - Computer Room - Lower Level 2 Jun-26-23 Jun-27-23 2 IN-4910 Hang Drywall - Computer Room - Lower Level 2 Jun-30-23 Jul-03-23 0 IN-4920 Drywall Taping - Computer Room - Lower Lev el 4 Jul-05-23 Jul-10-23 0 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Install Ceiling Grid - Office / Employee Locker / Work Room / Safe Room - Lower Level Install Carpet - Office / Employee Locker / Work Room / Safe Room - Lower Level Install Base - Office / Employee Locker / Work Room / Safe Room - Lower Level Install Wall Mounted Mirror - Office / Employee Locker / Work Room / Safe Room - Lower Level Install Light Fixtures / Fire Alarm Trim - Offi c e / Employee Loc ker / Work Room / Safe Room - Lower Level Mechanical Trim - Office / Employee Locker / Work Room / Safe Room - Lower Level Install Fire Sprinkler Heads - Office / Employee Locker / Work Room / Safe Room - Lower Level Hang Doors & Hardware - Office / Employee Locker / Work Room / Safe Room - Lower Level Install Ceiling Tile - Office / Employee Locker / Work Room / Safe Room - Lower Level Electrical Trim - Office / Employee Locker / Work Room / Safe Room - Lower Level Fire Alarm Trim - Offic e / Employee Loc ker / Work Room / Safe Room - Lower Level Paint Touch-Up - Office / Employee Locker / Work Room / Safe Room - Lower Level Install Copier (By Owner) - Office / Employee Locker / Work Room / Safe Room - Lower Level Employee Lockers (By Owner) - Office / Employee Locker / Work Room / Safe Room - Lower Level Safe (By Owner) - Office / Employee Locker / Work Room / Safe Room - Lower Level Layout & Form Equipment Pads - Electrical Room - Lower Level Drill & Epoxy Rebar for Equipment Pads - Electrical Room - Lower Level Pour Equipment Pads - Electrical Room - Lower Level
Strip & Clean Equipment Pads - Electrical Room - Lower Level Frame Walls - Electric al Room - Lower Lev el
In Wal l El ectri c al - E lec tri ca l Room - Lowe r L eve l Install Backing & Blocking - Electrical Room - Lower Level Hang Drywall - Electrical Room - Lower Level
Drywall Taping - Electric al Room - Lower Level
Prime & 1st Coat Paint - Electrical Room - Lower Level
Set Electrical Panels - Electrical Room - Lower Level
Set & Anchor Electrical Equipment - Electrical Room - Lower Level Rough-in Electrical Conduits to Panels / Equipment - Electrical Room - Lower Level Hang Door & Hardware - Electrical Room - Lower Level
Pull Wire & T erminate Electrical - Electrical Room - Lower Level Install Mechanical Trim - Electrical Room - Lower Level Install Fire Alarm Trim - Electrical Room - Lower Level Install Light Fixtures - Electrical Room - Lower Level
Seal Concrete - Electrical Room - Lower Level
Install Vinyl Base - Electrical Room - Lower Level
Paint Touch-Up - Electrical Room - Lower Level
Ready To B e Energ ize d - E le c trical Roo m - Lo wer Level AHJ Inspection - Electrical Room - Lower Level
Frame Walls - Computer Room - Lower Lev el
In Wal l El ectri c al - C omp ut er Ro om - Lowe r L eve l Install Backing & Blocking - Computer Room - Lower Level Hang Drywall - Computer Room - Lower Level
Drywall Taping - Computer Room - Lower Lev el
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 23 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 143 of 259 ends
Page 65 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
IN-4930 Prime & 1st Coat Paint - Computer Room - Lower Level 2 Jul-11-23 Jul-12-23 0 IN-4940 Install FRT Plywood on Wall - Computer Room - Level 1 Jul-13-23 Jul-13-23 0 IN-6720 Set Electrical Panels - Computer Room - Lower Level 2 Jul-14-23 Jul-17-23 0 IN-6730 Set & Anchor Computer Equipment / Racks - Computer Room - Lower Level (By Owner)2 Jul-18-23 Jul-19-23 0 IN-6740 Hang Door & Hardware - Computer Room - Lower Level 3 Jul-20-23 Jul-24-23 4 IN-6750 Rough-in Electrical Conduits to Panels / Equipment - Computer Room - Lower Level3 Jul-20-23 Jul-24-23 0 IN-6760 Pull Wire & T erminate Electrical - Computer Room - Lower Level 2 Jul-25-23 Jul-26-23 0 IN-6790 Install Vinyl Flooring & Base - Computer Room - Lower Level 2 Jul-27-23 Jul-28-23 0 IN-6780 Paint Touch-Up - Computer Room - Lower Level 1 Jul-31-23 Jul-31-23 0 OFOI-1004 IT / Low Voltage Installation (By Owner) (Calendar Days) 56 Aug-01-23 Sep-25-23 0 IN-6830 Install OFOI UPS - Computer Room - Lower Level 5 Aug-01-23 Aug-07-23 38 IN-6810 Ceiling Grid - Computer Room - Lower Level 2 Sep-26-23 Sep-27-23 0 IN-6800 Install Mechanical Trim - Computer Room - Lower Level 2 Sep-28-23 Sep-29-23 30 IN-6770 Install Light Fixtures / Fire Alarm Trim - Computer Room - Lower Level 2 Sep-28-23 Sep-29-23 0 IN-2890 Install Fire Sprinkler Heads - Computer Room - Lower Level 2 Sep-28-23 Sep-29-23 30 IN-6820 Ceiling Tile - Computer Room - Lower Level 1 Oct-02-23 Oct-02-23 30 Mechanical Room #17 / Janitor's Closet #15 / Fire-Riser #13 / Linen Storage #11Mechanical Room #17 / Janitor's Closet #15 / Fire-Riser #13 / Linen Storage #11 77 Jun-07-23 Sep-25-23 24 IN-1050 Layout & Form Equipment Pads - Mech Rm - Lower Level 2 Jun-07-23 Jun-08-23 69 IN-1060 Place Rebar for Equipment Pads - Mech Rm - Lower Level 2 Jun-09-23 Jun-12-23 69 IN-1070 Pour Equipment Pads - Mech Rm - Lower Level 1 Jun-13-23 Jun-13-23 69 IN-1080 Strip & Clean Equipment Pads - Mech Rm - Lower Level 1 Jun-14-23 Jun-14-23 69 IN-6970 F.R.T. Plywood - Mech Rm / Janitor's / Fire Riser / Linen Storage - Lower Level3 Aug-18-23 Aug-22-23 24 IN-6960 Service Sink - Janitor's - Lower Level 2 Aug-23-23 Aug-24-23 34 IN-1030 Install Plumbing Equipment - Mech Rm - Lower Level 4 Aug-23-23 Aug-28-23 24 IN-6990 Install Fiberglass Reinforced Plastic - Mech Rm / Janitor's / Linen Storage - Lower Level4 Aug-29-23 Sep-01-23 24 IN-1010 Install Light Fixtures / Fire Alarm Trim - Mech Rm / Janitor's / Linen Storage - Lower Level4 Sep-05-23 Sep-08-23 24 IN-6980 Seal Concrete - Mech Rm / Linen Storage - Lower Level 2 Sep-11-23 Sep-12-23 24 IN-1000 Install Base - Mech Rm / Janitor's / Linen Storage - Lower Level 2 Sep-13-23 Sep-14-23 24 IN-1020 Paint Touch-Up - Mech Rm / Janitor's / Linen Storage - Lower Level 2 Sep-15-23 Sep-18-23 24 IN-6950 Golf Ball Handing Equipment (Owner) - Mech Rm / Janitor's / Linen Storage - Lower Level5 Sep-19-23 Sep-25-23 24 Hallway #014 & 014aHallway #014 & 014a 12 Aug-18-23 Sep-05-23 38 IN-3420 Install Base - Hallway - Lower Level 2 Aug-18-23 Aug-21-23 25 IN-1130 Install Light Fixtures / Fire Alarm Trim - Hallway - Lower Level 3 Aug-22-23 Aug-24-23 25 IN- 1110 Paint Touch-Up - Hallway - Lower Level 2 Aug-25-23 Aug-28-23 38 OFOI-1012 Signage (By Owner) - Hallway - Lower Level 5 Aug-29-23 Sep-05-23 38 Men's & Women's Toilet Rm #008, 009Men's & Women's Toilet Rm #008, 009 42 Aug-18-23 Oct-17-23 19 IN-1140 Install Tile - Men's & Women's Toilet Room - Lower Level 8 Aug-18-23 Aug-29-23 0 IN-1150 Grout Tile - Men's & Women's Toilet Room - Lower Level 2 Aug-30-23 Aug-31-23 0 IN-1160 Install Toilets / Urinals - Men's & Women's Toilet Room - Lower Level 5 Sep-01-23 Sep-08-23 25 IN-1190 Install Light Fixtures / Fire Alarm Trim - Men's & Women's Toilet Room - Lower Level4 Sep-01-23 Sep-07-23 13 IN-1530 Field Measure Countertops - Men's & Women's T oilet Room - Lower Level 1 Sep-01-23 Sep-01-23 16 IN-1200 Install Mechanical Trim - Men's & Women's Toilet Room - Lower Level 4 Sep-08-23 Sep-13-23 13 IN-1170 Install Toilet Partitions - Men's & Women's Toilet Room - Lower Level 5 Sep-11-23 Sep-15-23 35 IN-1180 Install Toilet Accessories - Men's & Women's T oilet Room - Lower Level 4 Sep-18-23 Sep-21-23 35 IN-4130 Install Countertops - Men's & Women's T oilet Room - Lower Level 2 Oct-11-23 Oct-12-23 0 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Prime & 1st Coat Paint - Computer Room - Lower Level
Install FRT Plywood on Wall - Computer Room - Level
Set Electrical Panels - Computer Room - Lower Level
Set & Anchor Computer Equipment / Racks - Computer Room - Lower Level (By Owner) Hang Door & Hardware - Computer Room - Lower Level
Rough-in Electrical Conduits to Panels / Equipment - Computer Room - Lower Level Pull Wire & T erminate Electrical - Computer Room - Lower Level Install Vinyl Flooring & Base - Computer Room - Lower Level Paint Touch-Up - Computer Room - Lower Level
IT / Low Voltage Installation (By Owner) (Calendar Days) Install OFOI UPS - Computer Room - Lower Level
Ceiling Grid - Computer Room - Lower Level
Install Mechanical Trim - Computer Room - Lower Level
Install Light Fixtures / Fire Alarm Trim - Computer Room - Lower Level Install Fire Sprinkler Heads - Computer Room - Lower Level Ceiling Tile - Computer Room - Lower Level
Layout & Form Equipment Pads - Mech Rm - Lower Level
Place Rebar for Equipment Pads - Mech Rm - Lower Level
Pour Equipment Pads - Mech Rm - Lower Level
Strip & Clean Equipment Pads - Mech Rm - Lower Level
F.R.T . Plywood - Mech Rm / Janitor's / Fire Riser / Linen Storage - Lower Level Service Sink - Janitor's - Lower Level
Install Plumbing Equipment - Mech Rm - Lower Level
Install Fiberglass Reinforced Plastic - Mech Rm / Janitor's / Linen Storage - Lower Level Install Light Fixtures / Fire Alarm Trim - Mech Rm / Janitor's / Linen Storage - Lower Level Seal Concrete - Mech Rm / Linen Storage - Lower Level
Install Base - Mech Rm / Janitor's / Linen Storage - Lower Level Paint Touch-Up - Mech Rm / Janitor's / Linen Storage - Lower Level Golf Ball Handing Equipment (Owner) - Mech Rm / Janitor's / Linen Storage - Lower Level Install Base - Hallway - Lower Level
Install Light Fixtures / Fire Alarm Trim - Hallway - Lower Level Paint Touch-Up - Hallway - Lower Level
Signage (By Owner) - Hallway - Lower Level
Install Tile - Men's & Women's Toilet Room - Lower Level Grout Tile - Men's & Women's Toilet Room - Lower Level
Install Toilets / Urinals - Men's & Women's Toilet Room - Lower Level Install Light Fixtures / Fire Alarm Trim - Men's & Women's Toilet Room - Lower Level Field Measure Countertops - Men's & Women's T oilet Room - Lower Level Install Mechanical Trim - Men's & Women's Toilet Room - Lower Level Install Toilet Partitions - Men's & Women's Toilet Room - Lower Level Install Toilet Accessories - Men's & Women's T oilet Room - Lower Level Install Countertops - Men's & Women's T oilet Room - Lower Level Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 24 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 144 of 259 ends
Page 66 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
IN-4140 Install Sinks & Faucets - Men's & Women's T oilet Room - Lower Level 2 Oct-12-23 Oct-13-23 0 IN-1210 Paint Touch-Up - Men's & Women's Toilet Room - Lower Level 2 Oct-16-23 Oct-17-23 19 Hitting Bay #024Hitting Bay #024 71 Aug-25-23 Dec-07-23 15 IN-5040 Install Light Fixtures / Fire Alarm Trim - Hitting Bay - Lower Level 4 Aug-25-23 Aug-30-23 11 IN-5050 Install Heaters - Hitting Bay - Lower Level 3 Aug-29-23 Aug-31-23 2 IN-5030 Install Basket Fans - Hitting Bay - Lower Level 4 Aug-29-23 Sep-01-23 9 IN-9970 Remove Protection & Final Polish Concrete - Hitting - Bay - Lower Level 3 Sep-01-23 Sep-06-23 2 IN-5060 Paint Touch-Up - Hitting Bay - Lower Level 2 Sep-05-23 Sep-06-23 17 IN-5010 Metal Clad Column Enclosure - Hitting Bay - Lower Level 5 Sep-07-23 Sep-13-23 2 OFOI-1340 Hitting Bay Equipment (By Owner) - Hitting Bay - Lower Level 20 Sep-07-23 Oct-04-23 17 OFOI-1186 Venus & Hitting Bays Installation (By Owner) 50 Sep-26-23 Dec-07-23 15 Middle LevelMiddle Level 91 Jun-13-23 Oct-19-23 17
Rough-insRough-ins 62 Jun-13-23 Sep-08-23 25
IN-6180 Rough-in Overhead Fire Sprinkler - Middle Level 8 Jun-13-23 Jun-22-23 0 IN-6190 Rough-in Storm Drain / Waste & Vent - Middle Level 8 Jun-13-23 Jun-22-23 1 IN-6200 Rough-in Overhead Mechanical - Middle Level 8 Jun-14-23 Jun-23-23 0 IN-6210 Rough-in Overhead Plumbing - Middle Level 8 Jun-15-23 Jun-26-23 0 IN-6220 Rough-in Overhead Electrical - Middle Level 8 Jun-16-23 Jun-27-23 0 IN-10040 Rough-in Overhead Fire Alarm - Middle Level 8 Jun-16-23 Jun-27-23 0 IN-6230 Fr ame W all s & C ei li ngs - Mi ddl e Le v el 10 Jun-28-23 Jul-12-23 0 IN-6250 In Wall El ectrical - Middl e Level 7 Jul-13-23 Jul-21-23 0 IN-6240 In Wall Plumbing - Middle Lev el 7 Jul-13-23 Jul-21-23 0 IN-10050 In Wall Fi re Alarm - Middle Level 7 Jul-13-23 Jul-21-23 0 IN-6260 Install Backing & Blocking - Middle Level 4 Jul-24-23 Jul-27-23 0 IN-6270 Install Insulation - Middle Level 3 Jul-28-23 Aug-01-23 0 OFOI-11660 Install Beer Tubes (by Owner) - Bar - Middle Level 2 Jul-28-23 Jul-31-23 1 OFOI-11670 Install Soda Tubes (by Owner) - Bar - Middle Level 1 Jul-28-23 Jul-28-23 2 IN-1500 F.R.T Plywood @ Ceilings - Middle Level 5 Aug-02-23 Aug-08-23 10 IN-6280 Hang Drywall @ Wall s & Cei li ngs - Mi ddl e Level 5 Aug-02-23 Aug-08-23 0 IN-6300 Drywall Taping - Middle Level 7 Aug-09-23 Aug-17-23 0 IN-7060 Drill & Epoxy Rebar Dowels - Bar - Middle Level 2 Aug-09-23 Aug-10-23 5 IN-7070 Form Curbs - Bar - Middle Level 1 Aug-11-23 Aug-11-23 5 IN-7080 Pour Curbs - Bar - Middle Level 1 Aug-14-23 Aug-14-23 5 IN-6310 Prime & 1st Coat Paint - Middle Level 5 Aug-18-23 Aug-24-23 3 IN-10380 Paint Ceiling - Middle Level 10 Aug-25-23 Sep-08-23 25 FinishesFinishes 91 Jun-13-23 Oct-19-23 17
Lounge / Bar / Dining / Vestibule #100 & 111Lounge / Bar / Dining / Vestibule #100 & 111 58 Jul-31-23 Oct-19-23 6 IN-1300 Install Glass Guardrail - Lounge / Bar / Dinning / Vestibule - Middle Level 8 Jul-31-23 Aug-09-23 31 IN-10160 Frame ADA Counter Wall - Bar - Middle Level 2 Aug-15-23 Aug-16-23 5 IN-1360 Suspended Shelves - Lounge / Bar / Dinning / Vestibule - Middle Level 5 Aug-17-23 Aug-23-23 5 IN-10170 Install F.R.T. Plywood @ Walls - Lounge / Bar / Dinning / Vestibule - Middle Level2 Aug-17-23 Aug-18-23 13 IN-1470 Install Ceiling Metal Panels - Vestibule - Middle Level 6 Aug-21-23 Aug-28-23 13 IN-1520 Install Fiberglass Reinforced Plastic Panel - Lounge / Bar / Dinning / Vestibule - Middle Level5 Aug-21-23 Aug-25-23 19 IN-1350 Install Granite Countertops & Base - Lounge / Bar / Dinning / Vestibule - Middle Level5 Aug-24-23 Aug-30-23 5 IN-1340 Install Japanese Tile at Bar - Lounge / Bar / Dinning / Vestibule - Middle Level5 Aug-31-23 Sep-07-23 5 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Install Sinks & Faucets - Men's & Women's T oilet Room - Lower Level Paint Touch-Up - Men's & Women's Toilet Room - Lower Level Install Light Fixtures / Fire Alarm Trim - Hitting Bay - Lower Level Install Heaters - Hitting Bay - Lower Level
Install Basket Fans - Hitting Bay - Lower Level
Remove Protection & Final Polish Concrete - Hitting - Bay - Lower Level Paint Touch-Up - Hitting Bay - Lower Level
Metal Clad Column Enclosure - Hitting Bay - Lower Level Hitting Bay Equipment (By Owner) - Hitting Bay - Lower Level Venus & Hitting Bays Installation (By Owner)
Rough-in Overhead Fire Sprinkler - Middle Level
Rough-in Storm Drain / Waste & Vent - Middle Level
Rough-in Overhead Mechanical - Middle Level
Rough-in Overhead Plumbing - Middle Level
Rough-in Overhead Electrical - Middle Level
Rough-in Overhead Fire Alarm - Middle Level
Fr ame W all s & C ei li ngs - Mi ddl e Le v el
In Wal l El ectri c al - Mi ddl e Le vel
In Wall Plumbing - Middle Lev el
In Wall F ire Alarm - Middle Level
Install Backing & Blocking - Middle Level
Install Insulation - Middle Level
Install Beer Tubes (by Owner) - Bar - Middle Level
Install Soda Tubes (by Owner) - Bar - Middle Level
F.R.T Plywood @ Ceilings - Middle Level
Hang Drywall @ Walls & Ceilings - Middle Lev el
Drywall Taping - Middle Level
Drill & Epoxy Rebar Dowels - Bar - Middle Level
Form Curbs - Bar - Middle Level
Pour Curbs - Bar - Middle Level
Prime & 1st Coat Paint - Middle Level
Paint Ceiling - Middle Level
Install Glass Guardrail - Lounge / Bar / Dinning / Vestibule - Middle Level Frame ADA Counter Wall - Bar - Middle Level
Suspended Shelves - Lounge / Bar / Dinning / Vestibule - Middle Level Install F.R.T. Plywood @ Walls - Lounge / Bar / Dinning / Vestibule - Middle Level Install Ceiling Metal Panels - Vestibule - Middle Level Install Fiberglass Reinforced Plastic Panel - Lounge / Bar / Dinning / Vestibule - Middle Level Install Granite Countertops & Base - Lounge / Bar / Dinning / Vestibule - Middle Level Install Japanese Tile at Bar - Lounge / Bar / Dinning / Vestibule - Middle Level Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 25 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 145 of 259 ends
Page 67 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
IN-1450 Install Air Diffuser - Lounge / Bar / Dinning / Vestibule - Middle Level 5 Sep-06-23 Sep-12-23 3 IN-1310 Composite Facade Panels - Lounge / Bar / Dinning / Vestibule - Middle Level6 Sep-08-23 Sep-15-23 5 IN-1320 Install Wall Coverings - Lounge / Bar / Dinning / Vestibule - Middle Level 5 Sep-08-23 Sep-14-23 6 IN-1460 Install Curtain Wall System - Lounge / Bar / Di nning / Vestibule - Middle Level5 Sep-12-23 Sep-18-23 15 IN-1510 Urethane Flooring - Bar - Middle Level 6 Sep-12-23 Sep-19-23 10 IN-1490 Install Wood Ceiling Panels - Lounge / Bar / Dinning / Vestibule - Middle Level5 Sep-13-23 Sep-19-23 3 IN-1430 Install Corner Guards - Lounge / Bar / Dinning / Vestibule - Middle Level 2 Sep-18-23 Sep-19-23 5 IN-1380 Electrical Trim - Lounge / Bar / Dinning / Vestibule - Middle Level 5 Sep-20-23 Sep-26-23 5 IN-1480 Install Light Fixtures / Fire Alarm Trim - Lounge / Bar / Dinning / Vestibule - Middle Level5 Sep-20-23 Sep-26-23 3 IN-10060 Fire Alarm Trim - Lounge / Bar / Dinning / Vestibule - Middle Level 5 Sep-20-23 Sep-26-23 5 IN-1330 Install Wood Base - Lounge / Bar / Dinning / Vestibule - Middle Level 5 Sep-27-23 Oct-03-23 5 IN-9960 Remove Protection & Final Polish Concrete - Lounge / Bar / Dinning - Middle Level4 Sep-27-23 Oct-02-23 8 IN-3440 Paint Touch-Up - Lounge / Bar / Dinni ng / Vestibule - Middle Level 2 Oct-04-23 Oct-05-23 5 OFOI-1037 Television (By Owner) - Lounge / Bar / Dinning / Vestibule - Middle Level 10 Oct-06-23 Oct-19-23 6 OFOI-1039 Install Signage (By Owner) - Lounge / Bar / Dinning / Vestibule - Middle Level10 Oct-06-23 Oct-19-23 6 OFOI-1040 Customs Graphics (By Owner) - Lounge / Bar / Dinning / Vestibule - Middle Level10 Oct-06-23 Oct-19-23 6 OFOI-1044 Install Frosted Film at Sliding Door (By Owner) - Lounge / Bar / Dinning / Vestibule - Middle Level5 Oct-06-23 Oct-12-23 11 OFOI-1390 Bar Equipment (By Owner) - Lounge / Bar / Dinning / Vestibule - Middle Level10 Oct-06-23 Oct-19-23 5 Kitchen / Beverage Station #112 & #103Kitchen / Beverage Station #112 & #103 41 Aug-18-23 Oct-16-23 2 IN-1540 Rough-in Exhaust Hood - Kitchen / Beverage Station - Middle Level 5 Aug-18-23 Aug-24-23 0 IN-1560 Install Ceiling Grid - Kitchen / Beverage Station - Middle Level 4 Aug-25-23 Aug-30-23 5 IN-4330 Rough-in Ansul System - Kitchen - Middle Level 5 Aug-25-23 Aug-31-23 0 IN-1590 Final Connection to Exhaust Hood - Kitchen / Beverage Station - Middle Level4 Aug-28-23 Aug-31-23 0 IN-1550 Install Wal k -In Freezer & Cool er (by Owner) - Kitchen / B ev er ag e St ati on - Mi dd le Le ve l4 Sep-01-23 Sep-07-23 0 IN-1610 Prepare Surface for Flooring - Kitchen / Beverage Station - Middle Level 2 Sep-08-23 Sep-11-23 0 IN-1620 Urethane Flooring & Base - Kitchen / Beverage Station - Middle Level 5 Sep-12-23 Sep-18-23 0 IN-1630 Install Fiberglass Reinforced Plastic - Kitchen / Beverage Station - Middle Level5 Sep-19-23 Sep-25-23 0 IN-1570 Install Light Fixtures / Fire Alarm Trim - Kitchen / Beverage Station - Middle Level3 Sep-19-23 Sep-21-23 6 IN-1580 Mechanical Trim - Kitchen / Beverage Station - Middle Level 3 Sep-19-23 Sep-21-23 15 IN-1640 Install Stainless Steel - Kitchen / Beverage Station - Middle Level 5 Sep-19-23 Sep-25-23 0 IN-2900 Install Fire Sprinkler Heads - Kitchen / Beverage Station - Middle Level 3 Sep-19-23 Sep-21-23 15 IN-1600 Ceiling Tile - Kitchen / Beverage Station - Middle Level 2 Sep-22-23 Sep-25-23 15 IN-1660 Paint Touch-Up - Kitchen / Beverage Station - Mi ddle Level 2 Sep-26-23 Sep-27-23 15 OFOI-1065 Kitchen Equipment (By Owner) - Kitchen / Beverage Station - Middle Level15 Sep-26-23 Oct-16-23 0 Bag Storage #107 / Storage #106 / Janitor's Closet #108Bag Storage #107 / Storage #106 / Janitor's Closet #108 34 Aug-18-23 Oct-05-23 27 IN-10240 Install Ceiling Grid - Bag Storage / Storage / Janitor's Closet - Middle Level10 Aug-18-23 Aug-31-23 27 IN-10230 Install Light Fixtures / Fire Alarm Trim - Bag Storage / Storage / Janitor's Closet - Middle Level3 Sep-01-23 Sep-06-23 27 IN-10270 Install Fire Sprinkler Heads - Bag Storage / Storage / Janitor's Closet - Middle Level3 Sep-01-23 Sep-06-23 27 IN-10280 Ceiling Tile - Bag Storage / Storage / Janitor's Closet - Middle Level 3 Sep-07-23 Sep-11-23 27 IN-10250 Prep & Seal Concrete - Bag Storage 1 Sep-12-23 Sep-12-23 36 IN-10260 Urethane Flooring & Base - Bag Closet / Janitor's Closet 10 Sep-12-23 Sep-25-23 27 IN-10210 Install Fiberglass Reinforced Plastic - Bag Storage / Storage / Janitor's Closet - Middle Level5 Sep-26-23 Oct-02-23 27 IN-10220 Install Mop Sink - Janitor's Closet - Middle Level 3 Oct-03-23 Oct-05-23 27 Men's & Women's Toilet Rm / Family ToiletMen's & Women's Toilet Rm / Family Toilet 34 Aug-30-23 Oct-17-23 19 IN-1220 Install Tile - Men's & Women's Toilet Room / Family T oilet - Middle Level 8 Aug-30-23 Sep-11-23 0 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Install Air Diffuser - Lounge / Bar / Dinning / Vestibule - Middle Level Composite Facade Panels - Lounge / Bar / Dinning / Vestibule - Middle Level Instal l Wal l C ov er in gs - Lou ng e / B ar / D in ni n g / Vestibule - Middle Level Install Curtain Wall System - Lounge / Bar / Dinning / Vestibule - Middle Level Urethane Flooring - Bar - Middle Level
Install Wood Ceiling Panels - Lounge / Bar / Dinning / Vestibule - Middle Level Install Corner Guards - Lounge / Bar / Dinning / Vestibule - Middle Level Electrical Trim - Lounge / Bar / Dinning / Vestibule - Middle Level Install Light Fixtures / Fire Alarm Trim - Lounge / Bar / Dinning / Vestibule - Middle Level Fire Alarm Trim - Lounge / Bar / Dinning / Vestibule - Middle Level Install Wood Base - Lounge / Bar / Dinning / Vestibule - Middle Level Remove Protection & Final Polish Concrete - Lounge / Bar / Dinning - Middle Level Paint Touch-Up - Lounge / Bar / Dinning / Vestibule - Middle Level Television (By Owner) - Lounge / Bar / Dinning / Vestibule - Middle Level Install Signage (By Owner) - Lounge / Bar / Dinning / Vestibule - Middle Level Customs Graphics (By Owner) - Lounge / Bar / Dinning / Vestibule - Middle Level Install Frosted Film at Sliding Door (By Owner) - Lounge / Bar / Dinning / Vestibule - Middle Level Bar Equipment (By Owner) - Lounge / Bar / Dinning / Vestibule - Middle Level Rough-in Exhaust Hood - Kitchen / Beverage Station - Middle Level Install Ceiling Grid - Kitchen / Beverage Station - Middle Level Rough-in Ansul System - Kitchen - Middle Level
Final Connection to Exhaust Hood - Kitchen / Beverage Station - Middle Level Install Walk -In Freezer & Cooler ( by Owner) - Kitchen / B ev er ag e St ati on - Mi dd le Le ve l Prepare Surface for Flooring - Kitchen / Beverage Station - Middle Level Urethane Flooring & Base - Kitchen / Beverage Station - Middle Level Install Fiberglass Reinforced Plastic - Kitchen / Beverage Station - Middle Level Install Light Fixtures / Fire Alarm Trim - Kitchen / Beverage Station - Middle Level Mechanical Trim - Kitchen / Beverage Station - Middle Level Install Stainless Steel - Kitchen / Beverage Station - Middle Level Install Fire Sprinkler Heads - Kitchen / Beverage Station - Middle Level Ceiling Tile - Kitchen / Beverage Station - Middle Level Paint Touch-Up - Kitc hen / Beverage Station - Middle Lev el Kitchen Equipment (By Owner) - Kitchen / Beverage Station - Middle Level Install Ceiling Grid - Bag Storage / Storage / Janitor's Closet - Middle Level Install Light Fixtures / Fire Alarm Trim - Bag Storage / Storage / Janitor's Closet - Middle Level Install Fire Sprinkler Heads - Bag Storage / Storage / Janitor's Closet - Middle Level Ceiling Tile - Bag Storage / Storage / Janitor's Closet - Middle Level Prep & Seal Concrete - Bag Storage
Urethane Flooring & Base - Bag Closet / Janitor's Closet Install Fiberglass Reinforced Plastic - Bag Storage / Storage / Janitor's Closet - Middle Level Install Mop Sink - Janitor's Closet - Middle Level
Install Tile - Men's & Women's Toilet Room / Family T oilet - Middle Level Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 26 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 146 of 259 ends
Page 68 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
IN-1230 Grout Tile - Men's & Women's Toilet Room / Family Toilet - Middle Level 2 Sep-12-23 Sep-13-23 0 IN-1240 Install Toilets / Urinals - Men's & Women's Toilet Room / Family T oil et - Mi ddl e Lev el5 Sep-14-23 Sep-20-23 17 IN-1270 Install Light Fixtures / Fire Alarm Trim - Men's & Women's Toilet Room / Family Toilet - Middle Level4 Sep-14-23 Sep-19-23 5 IN-4150 Field Measure Countertops - Men's & Women's T oilet Room / Family Toilet - Middle Level1 Sep-14-23 Sep-14-23 8 IN-1280 Install Mechanical Trim - Men's & Women's Toilet Room / Family T oilet - Middle Level4 Sep-20-23 Sep-25-23 5 IN-1250 Install Toilet Partitions - Men's & Women's Toilet Room / Family Toilet - Middle Level5 Sep-21-23 Sep-27-23 27 IN-1260 Install Toilet Accessories - Men's & Women's T oilet Room / Family Toilet - Middle Level4 Sep-28-23 Oct-03-23 27 IN-4160 Install Countertops - Men's & Women's T oilet Room / Family Toilet - Middle Level2 Oct-11-23 Oct-12-23 0 IN-4170 Install Sinks & Faucets - Men's & Women's T oilet Room / Family Toilet - Middle Level2 Oct-12-23 Oct-13-23 0 IN-1290 Paint Touch-Up - Men's & Women's Toilet Room / Family T oilet - Mi ddle Lev el2 Oct-16-23 Oct-17-23 19 Electrical Room (#114)Electrical Room (#114) 41 Jun-13-23 Aug-09-23 35 IN-1670 Layout & Form Equipment Pads - Electrical Room - Middle Level 2 Jun-13-23 Jun-14-23 12 IN-1680 Drill & Epoxy Rebar for Equipment Pads - Electrical Room - Middle Level 2 Jun-15-23 Jun-16-23 12 IN-1690 Pour Equipment Pads - Electrical Room - Middle Level 1 Jun-19-23 Jun-19-23 12 IN-1700 Strip & Clean Equipment Pads - Electrical Room - Middle Level 1 Jun-20-23 Jun-20-23 12 IN-4760 Frame Wal ls - Electri c al Room - Middle Level 4 Jun-21-23 Jun-26-23 35 IN-4770 In Wall El ectrical - Electri c al Room - Middle Level 4 Jun-27-23 Jun-30-23 35 IN-4780 Install Backing & Blocking - Electrical Room - Middle Level 2 Jul-03-23 Jul-05-23 35 IN-4790 Hang Drywall - Electrical Room - Middle Level 2 Jul-06-23 Jul-07-23 35 IN-4800 Drywall Taping - Electri cal Room - Middle Level 4 Jul-10-23 Jul-13-23 35 IN-4810 Prime & 1st Coat Paint - Electrical Room - Middle Level 2 Jul-14-23 Jul-17-23 35 IN-1710 Set Electrical Panels - Electrical Room - Middle Level 3 Jul-18-23 Jul-20-23 35 IN-1720 Set & Anchor Electrical Equipment - Electrical Room - Middle Level 3 Jul-21-23 Jul-25-23 35 IN-1730 Hang Door & Hardware - Electrical Room - Middle Level 3 Jul-26-23 Jul-28-23 42 IN-1740 Rough-in Electrical Conduits to Panels / Equipment - Electrical Room - Middle Level3 Jul-26-23 Jul-28-23 35 IN-1750 Pull Wire & T erminate Electrical - Electrical Room - Middl e Level 3 Jul-31-23 Aug-02-23 35 IN-1760 Install Light Fixtures - Electrical Room - Middle Level 2 Aug-03-23 Aug-04-23 35 IN-10070 Install Fire Alarm Trim - Electrical Room - Middle Level 2 Aug-03-23 Aug-04-23 35 IN-1780 Seal Concrete - Electrical Room - Middle Level 1 Aug-07-23 Aug-07-23 35 IN-1790 Install Vinyl Base - Electrical Room - Middle Level 1 Aug-08-23 Aug-08-23 35 IN-1770 Paint Touch-Up - Electrical Room - Middle Level 1 Aug-09-23 Aug-09-23 35 IN-1800 Ready T o Be Energiz ed - El ectrical Room - Middle Lev el 0 Aug-09-23 35 Event Sales Office (#115)Event Sales Office (#115) 19 Aug-25-23 Sep-21-23 37 IN-1880 Interior Glazing - Event Sales - Middle Level 5 Aug-25-23 Aug-31-23 8 IN-1900 Install P.Lam Countertop & Millwork Wood Cap - Event Sales - Middle Level5 Aug-25-23 Aug-31-23 8 IN-1910 Install Ceiling Grid - Event Sales - Middle Level 5 Aug-25-23 Aug-31-23 12 IN-1960 Install Carpet - Event Sales - Middle Level 4 Sep-01-23 Sep-07-23 8 IN-1970 Install Vinyl Tile - Event Sales - Middle Level 4 Sep-01-23 Sep-07-23 40 IN-1820 Install Base - Event Sales - Middle Level 2 Sep-08-23 Sep-11-23 40 IN-1860 Install Wal l Mounted Mi rror - Ev ent Sal es - Middle Level 2 Sep-08-23 Sep-11-23 43 IN-1930 Install Light Fixtures / Fire Alarm Trim - Event Sales - Middle Level 5 Sep-08-23 Sep-14-23 8 IN-1940 Mechanical Trim - Event Sales - Middle Level 5 Sep-08-23 Sep-14-23 37 IN-2910 Install Fire Sprinkler Heads - Event Sales - Middle Level 5 Sep-08-23 Sep-14-23 24 IN-1840 Hang Doors & Hardware - Event Sales - Middle Level 3 Sep-12-23 Sep-14-23 40 IN-1920 Install Ceiling Tile - Event Sales - Middle Level 3 Sep-15-23 Sep-19-23 37 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Grout Tile - Men's & Women's Toilet Room / Family Toilet - Middle Level Install Toilets / Urinals - Men's & Women's Toilet Room / Family T oil et - Mi ddl e Level Install Light Fixtures / Fire Alarm Trim - Men's & Women's Toilet Room / Family Toilet - Middle Level Field Measure Countertops - Men's & Women's Toilet Room / Family Toilet - Middle Level Install Mechanical Trim - Men's & Women's Toilet Room / Family T oilet - Middle Level Install Toilet Partitions - Men's & Women's Toilet Room / Family Toilet - Middle Level Install Toilet Accessories - Men's & Women's T oilet Room / Family Toilet - Middle Level Install Countertops - Men's & Women's T oilet Room / Family Toilet - Middle Level Install Sinks & Faucets - Men's & Women's T oilet Room / Family Toilet - Middle Level Paint Touch-Up - Men's & Women's Toilet Room / Family To il et - Mid dle Lev el Layout & Form Equipment Pads - Electrical Room - Middle Level Drill & Epoxy Rebar for Equipment Pads - Electrical Room - Middle Level Pour Equipment Pads - Electrical Room - Middle Level
Strip & Clean Equipment Pads - Electrical Room - Middle Level F rame W all s - E lect r ic al R oo m - Mi ddl e Le v el In Wall El ectrical - Electri c al Room - Middle Level Install Backing & Blocking - Electrical Room - Middle Level Hang Drywall - Electrical Room - Middle Level
Drywall Taping - Electric al Room - Middle Level
Prime & 1st Coat Paint - Electrical Room - Middle Level Set Electrical Panels - Electrical Room - Middle Level
Set & Anchor Electrical Equipment - Electrical Room - Middle Level Hang Door & Hardware - Electrical Room - Middle Level
Rough-in Electrical Conduits to Panels / Equipment - Electrical Room - Middle Level Pull Wire & T erminate Electrical - Electrical Room - Middle Level Install Light Fixtures - Electrical Room - Middle Level Install Fire Alarm Trim - Electrical Room - Middle Level Seal Concrete - Electrical Room - Middle Level
Install Vinyl Base - Electrical Room - Middle Level
Paint Touch-Up - Electrical Room - Middle Level
Ready T o Be Energiz ed - El ectrical Room - Middle Lev el Interior Glazing - Event Sales - Middle Level
Install P.Lam Countertop & Millwork Wood Cap - Event Sales - Middle Level Install Ceiling Grid - Event Sales - Middle Level
Install Carpet - Event Sales - Middle Level
Install Vinyl Tile - Event Sales - Middle Level
Install Base - Event Sales - Middle Level
Install Wall Mounted Mirror - Ev ent Sales - Middle Lev el Install Light Fixtures / Fire Alarm Trim - Event Sales - Middle Level Mechanical Trim - Event Sales - Middle Level
Install Fire Sprinkler Heads - Event Sales - Middle Level Hang Doors & Hardware - Event Sales - Middle Level
Install Ceiling Tile - Event Sales - Middle Level
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 27 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 147 of 259 ends
Page 69 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
IN-1950 Electrical Trim - Event Sales - Middle Level 3 Sep-15-23 Sep-19-23 8 IN-10080 Fire Alarm Trim - Event Sales - Middle Level 3 Sep-15-23 Sep-19-23 8 IN-1830 Paint Touch-Up - Event Sales - Middle Level 2 Sep-20-23 Sep-21-23 37 Hallway (#110)Hallway (#110) 12 Sep-01-23 Sep-19-23 39
IN-1980 Install Ceiling Grid - Hallway - Middle Level 3 Sep-01-23 Sep-06-23 12 IN-2020 Install Vinyl Tile - Hallway - Middle Level 3 Sep-07-23 Sep-11-23 12 IN-2000 Install Light Fixtures / Fire Alarm Trim - Hallway - Middle Level 2 Sep-12-23 Sep-13-23 12 IN-2010 Mechanical Trim - Hallway - Middle Level 2 Sep-12-23 Sep-13-23 39 IN-2030 Install Base - Hallway - Middle Level 2 Sep-12-23 Sep-13-23 41 IN-2920 Install Fire Sprinkler Heads - Hallway - Middle Level 2 Sep-12-23 Sep-13-23 25 IN-1990 Install Ceiling Tile - Hallway - Middle Level 2 Sep-14-23 Sep-15-23 39 IN-2040 Paint Touch-Up - Hallway - Middle Level 2 Sep-18-23 Sep-19-23 39 Hopper Closet (#102)Hopper Closet (#102) 20 Aug-18-23 Sep-15-23 30 IN-10350 F.R.T Plywood @ Walls - Middle Level 1 Aug-18-23 Aug-18-23 30 IN-10310 Install Light Fixtures / Fire Alarm Trim - Hopper Closet - Middle Level 2 Aug-21-23 Aug-22-23 30 IN-10320 Mechanical Trim - Hopper Closet - Middle Level 2 Aug-21-23 Aug-22-23 30 IN-10340 Install Fire Sprinkler Heads - Hopper Closet - Middle Level 2 Aug-21-23 Aug-22-23 30 IN-10300 Prep & Seal Concrete - Hopper Closet - Middle Level 3 Aug-23-23 Aug-25-23 30 IN-10330 Install Base - Hopper Closet - Middle Level 2 Aug-28-23 Aug-29-23 30 IN-10360 Paint Touch-Up - Hopper Closet - Middle Level 2 Aug-30-23 Aug-31-23 30 IN-10370 Install OFOI Equipment - Hopper Closet - Middle Level 10 Sep-01-23 Sep-15-23 30 Hitting BayHitting Bay 28 Aug-31-23 Oct-10-23 13
IN-2070 Install Light Fixtures / Fire Alarm Trim - Hitting Bay - Middle Level 4 Aug-31-23 Sep-06-23 11 IN-2080 Install Heaters - Hitting Bay - Middle Level 3 Sep-01-23 Sep-06-23 4 IN-2060 Install Basket Fans - Hitting Bay - Middle Level 4 Sep-05-23 Sep-08-23 9 IN-9980 Remove Protection & Final Polish Concrete - Hitting Bay - Middle Level 3 Sep-07-23 Sep-11-23 4 IN-2090 Paint Touch-Up - Hitting Bay - Middle Level 2 Sep-11-23 Sep-12-23 13 OFOI-1410 Hitting Bay Equipment (By Owner) - Hitting Bay - Middle Level 20 Sep-13-23 Oct-10-23 13 OFOI-1910 Install Safety Catch Net (By Owner) - Hitting Bay - Middle Level 10 Sep-13-23 Sep-26-23 23 IN-2050 Metal Clad Column Enclosure - Hitting Bay - Middle Level 5 Sep-14-23 Sep-20-23 2 Upper LevelUpper Level 88 Jun-22-23 Oct-25-23 13
Rough-insRough-ins 61 Jun-22-23 Sep-18-23 19
IN-6330 Rough-in Storm Drain / Waste & Vent - Upper Level 8 Jun-22-23 Jul-03-23 1 IN-6320 Rough-in Overhead Fire Sprinkler - Upper Level 8 Jun-22-23 Jul-03-23 0 IN-6340 Rough-in Overhead Mechanical - Upper Level 8 Jun-23-23 Jul-05-23 0 IN-6350 Rough-in Overhead Plumbing - Upper Level 8 Jun-26-23 Jul-06-23 0 IN-6360 Rough-in Overhead Electrical - Upper Level 8 Jun-27-23 Jul-07-23 0 IN-10090 Rough-in Overhead Fire Alarm - Upper Level 8 Jun-27-23 Jul-07-23 0 IN-7090 Drill & Epoxy Rebar Dowels - Bar - Upper Level 2 Jul-05-23 Jul-06-23 20 IN-7100 Form Curbs - Bar - Upper Level 1 Jul-07-23 Jul-07-23 20 IN-6370 Frame Wal ls & Ceil ings - Upper Lev el 10 Jul-10-23 Jul-21-23 0 IN-7110 Pour Curbs - Bar - Upper Level 1 Jul-10-23 Jul-10-23 20 IN-6390 In Wall El ectrical - Upper Level 7 Jul-24-23 Aug-01-23 0 IN-6380 In Wall Pl umbing - Upper Level 7 Jul-24-23 Aug-01-23 0 IN-10100 In Wall Fi re Alarm - Upper Level 7 Jul-24-23 Aug-01-23 0 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Electrical Trim - Event Sales - Middle Level
Fire Alarm Trim - Event Sales - Middle Level
Paint Touch-Up - Event Sales - Middle Level
Install Ceiling Grid - Hallway - Middle Level
Install Vinyl Tile - Hallway - Middle Level
Install Light Fixtures / Fire Alarm Trim - Hallway - Middle Level Mechanical Trim - Hallway - Middle Level
Install Base - Hallway - Middle Level
Install Fire Sprinkler Heads - Hallway - Middle Level
Install Ceiling Tile - Hallway - Middle Level
Paint Touch-Up - Hal lway - Middle Level
F.R.T Plywood @ Walls - Middle Level
Install Light Fixtures / Fire Alarm Trim - Hopper Closet - Middle Level Mechanical Trim - Hopper Closet - Middle Level
Install Fire Sprinkler Heads - Hopper Closet - Middle Level Prep & Seal Concrete - Hopper Closet - Middle Level
Install Base - Hopper Closet - Middle Level
Paint Touch-Up - Hopper Closet - Middle Level
Install OFOI Equipment - Hopper Closet - Middle Level
Install Light Fixtures / Fire Alarm Trim - Hitting Bay - Middle Level Install Heaters - Hitting Bay - Middle Level
Install Basket Fans - Hitting Bay - Middle Level
Remove Protection & Final Polish Concrete - Hitting Bay - Middle Level Paint Touch-Up - Hitting Bay - Middle Level
Hitting Bay Equipment (By Owner) - Hitting Bay - Middle Level Install Safety Catch Net (By Owner) - Hitting Bay - Middle Level Metal Clad Column Enclosure - Hitting Bay - Middle Level Rough-in Storm Drain / Waste & Vent - Upper Level
Rough-in Overhead Fire Sprinkler - Upper Level
Rough-in Overhead Mechanical - Upper Level
Rough-in Overhead Plumbing - Upper Level
Rough-in Overhead Electrical - Upper Level
Rough-in Overhead Fire Alarm - Upper Level
Drill & Epoxy Rebar Dowels - Bar - Upper Level
Form Curbs - Bar - Upper Level
Frame Walls & Ceilings - Upper Lev el
Pour Curbs - Bar - Upper Level
In Wall El ectrical - Upper Level
In Wall Pl umbing - Upper Level
In Wall Fi re Alarm - Upper Level
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 28 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 148 of 259 ends
Page 70 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
IN-6400 Install Backing & Blocking - Upper Level 4 Aug-02-23 Aug-07-23 0 IN-10200 Install Shelving Supports at Bar - Upper Level 2 Aug-02-23 Aug-03-23 0 IN-6410 Install Insulation - Upper Level 3 Aug-07-23 Aug-09-23 0 OFOI-11680 Install Beer Tubes (by Owner) - Bar - Upper Level 2 Aug-08-23 Aug-09-23 0 OFOI-11690 Install Soda Tubes (by Owner) - Bar - Upper Level 1 Aug-08-23 Aug-08-23 1 IN-2110 F.R.T Plywood @ Ceilings - Upper Lev el 5 Aug-10-23 Aug-16-23 7 IN-6420 Hang Drywall @ Wall s & Cei li ngs - Upper Level 5 Aug-10-23 Aug-16-23 0 IN-6440 Drywall Taping - Upper Level 7 Aug-17-23 Aug-25-23 0 IN-6450 Prime & 1st Coat Paint - Upper Level 5 Aug-28-23 Sep-01-23 0 IN-6460 Paint Ceiling - Upper Level 10 Sep-05-23 Sep-18-23 19 FinishesFinishes 88 Jun-22-23 Oct-25-23 13
Bar / Bar SeatingBar / Bar Seating 70 Jul-11-23 Oct-17-23 8 IN-10180 Frame ADA Counter Wall - Bar - Upper Level 2 Jul-11-23 Jul-12-23 20 IN-5100 Install Glass Guardrail - Bar / Bar Seating - Upper Level 8 Jul-24-23 Aug-02-23 23 IN-10190 Install F.R.T. Plywood @ Walls - Bar / Bar Seating - Upper Level 2 Aug-10-23 Aug-11-23 0 IN-5230 Urethane Flooring - Bar / Bar Seating - Upper Level 6 Aug-14-23 Aug-21-23 0 IN-5210 Install Granite Countertops - Bar / Bar Seating - Upper Level 5 Aug-22-23 Aug-28-23 0 IN-5280 Install Fiberglass Reinforced Plastic Panels - Bar / Bar Seating - Upper Level5 Aug-22-23 Aug-28-23 30 IN-5070 Install Wal l Coverings - Bar / Bar Seati ng - Upper Le v el 5 Aug-29-23 Sep-05-23 15 IN-5170 Install Japanese Tile - Bar / Bar Seating - Upper Level 5 Aug-29-23 Sep-05-23 0 IN-5440 Install Tile Flooring - Bar / Bar Seating - Upper Level 5 Sep-06-23 Sep-12-23 0 IN-5080 Install Composite Facade Panel - Bar / Bar Seating - Upper Level 8 Sep-13-23 Sep-22-23 2 IN-5130 Install Metal Ceiling Panels - Bar / Bar Seating - Upper Level 5 Sep-13-23 Sep-19-23 5 IN-5200 Install Ceramic Tile - Bar / Bar Seating - Upper Level 6 Sep-13-23 Sep-20-23 12 IN-5340 Install Wood Wall Panels - Bar / Bar Seating - Upper Level 5 Sep-13-23 Sep-19-23 0 IN-5430 Install Wood Ceiling Panels - Bar / Bar Seating - Upper Level 5 Sep-20-23 Sep-26-23 0 IN-5090 Install Base - Bar / Bar Seating - Upper Level 2 Sep-21-23 Sep-22-23 12 IN-5190 Install Light Fixtures / Fire Alarm Trim - Bar / Bar Seating - Upper Level 3 Sep-27-23 Sep-29-23 0 IN-5220 Electrical Trim - Bar / Bar Seating - Upper Level 3 Sep-27-23 Sep-29-23 0 IN-5450 Install Mechanical Trim - Bar / Bar Seating - Upper Level 3 Sep-27-23 Sep-29-23 1 IN-10110 Fire Alarm Trim - Bar / Bar Seating - Upper Level 3 Sep-27-23 Sep-29-23 0 IN-5460 Paint Touch-Up - Bar / Bar Seating - Upper Level 2 Oct-02-23 Oct-03-23 7 OFOI-5140 Signage (By Owner) - Bar / Bar Seating - Upper Level 10 Oct-04-23 Oct-17-23 8 OFOI-2160 Turf Wall Covering (By Owner) - Bar / Bar Seating - Upper Level 10 Oct-04-23 Oct-17-23 8 OFOI-2180 Televisions (By Owner) - Bar / Bar Seating - Upper Level 10 Oct-04-23 Oct-17-23 8 OFOI-2330 Customs Graphics (By Owner) - Bar / Bar Seating - Upper Level 10 Oct-04-23 Oct-17-23 8 OFOI-2420 Banquette Seating (By Owner) - Bar / Bar Seating - Upper Level 10 Oct-04-23 Oct-17-23 8 OFOI-1460 Bar Equipment (By Owner) - Bar / Bar Seating - Upper Level 10 Oct-04-23 Oct-17-23 7 Storage / Hopper / Beverage Station / Bag StorageStorage / Hopper / Beverage Station / Bag Storage 19 Sep-05-23 Sep-29-23 31 IN-2460 Roof Access Ladder - Storage / Hopper / Beverage Station / Bag Storage - Upper Level3 Sep-05-23 Sep-07-23 45 IN-2470 Install Ceiling Grid - Storage / Hopper / Beverage Station / Bag Storage - Upper Level5 Sep-05-23 Sep-11-23 2 IN-2520 Install Vinyl Tile - Storage / Hopper / Beverage Station / Bag Storage - Upper Level4 Sep-12-23 Sep-15-23 2 IN-2490 Mechanical Trim - Storage / Hopper / Beverage Station / Bag Storage - Upper Level5 Sep-18-23 Sep-22-23 31 IN-2530 Install Base - Storage / Hopper / Beverage Station / Bag Storage - Upper Level2 Sep-18-23 Sep-19-23 34 IN-2480 Install Light Fixtures / Fire Alarm Trim - Storage / Hopper / Beverage Station / Bag Storage - Upper Level5 Sep-18-23 Sep-22-23 2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Install Backing & Blocking - Upper Level
Install Shelving Supports at Bar - Upper Level
Install Insulation - Upper Level
Install Beer Tubes (by Owner) - Bar - Upper Level
Install Soda Tubes (by Owner) - Bar - Upper Level
F.R.T Plywood @ Ceilings - Upper Lev el
Hang Drywall @ Wall s & Cei li ngs - Upper Level
Drywall Taping - Upper Level
Prime & 1st Coat Paint - Upper Level
Paint Ceiling - Upper Level
Frame ADA Counter Wall - Bar - Upper Level
Install Glass Guardrail - Bar / Bar Seating - Upper Level Install F.R.T. Plywood @ Walls - Bar / Bar Seating - Upper Level Urethane Flooring - Bar / Bar Seating - Upper Level
Install Granite Countertops - Bar / Bar Seating - Upper Level Install Fiberglass Reinforced Plastic Panels - Bar / Bar Seating - Upper Level Install Wal l Coverings - Bar / Bar Seati ng - Upper Le v el Install Japanese Tile - Bar / Bar Seating - Upper Level Install Tile Flooring - Bar / Bar Seating - Upper Level Install Composite Facade Panel - Bar / Bar Seating - Upper Level Install Metal Ceiling Panels - Bar / Bar Seating - Upper Level Install Ceramic Tile - Bar / Bar Seating - Upper Level
Install Wood Wall Panels - Bar / Bar Seating - Upper Level Install Wood Ceiling Panels - Bar / Bar Seating - Upper Level Install Base - Bar / Bar Seating - Upper Level
Install Light Fixtures / Fire Alarm Trim - Bar / Bar Seating - Upper Level Electrical Trim - Bar / Bar Seating - Upper Level
Install Mechanical Trim - Bar / Bar Seating - Upper Level Fire Alarm Trim - Bar / Bar Seating - Upper Level
Paint Touch-Up - Bar / Bar Seating - Upper Level
Signage (By Owner) - Bar / Bar Seating - Upper Level
Turf Wall Covering (By Owner) - Bar / Bar Seating - Upper Level Televisions (By Owner) - Bar / Bar Seating - Upper Level Customs Graphics (By Owner) - Bar / Bar Seating - Upper Level Banquette Seating (By Owner) - Bar / Bar Seating - Upper Level Bar Equipment (By Owner) - Bar / Bar Seating - Upper Level Roof Access Ladder - Storage / Hopper / Beverage Station / Bag Storage - Upper Level Install Ceiling Grid - Storage / Hopper / Beverage Station / Bag Storage - Upper Level Install Vinyl Tile - Storage / Hopper / Beverage Station / Bag Storage - Upper Level Mechanical Trim - Storage / Hopper / Beverage Station / Bag Storage - Upper Level Install Base - Storage / Hopper / Beverage Station / Bag Storage - Upper Level Install Light Fixtures / Fire Alarm Trim - Storage / Hopper / Beverage Station / Bag Storage - Upper Level Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 29 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 149 of 259 ends
Page 71 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
IN-2930 Install Fire Sprinkler Heads - Storage / Hopper / Beverage Station / Bag Storage - Upper Level5 Sep-18-23 Sep-22-23 18 IN-2540 Hang Doors & Hardware - Storage / Hopper / Beverage Station / Bag Storage - Upper Level3 Sep-20-23 Sep-22-23 34 IN-2510 Electrical Trim - Storage / Hopper / Beverage Station / Bag Storage - Upper Level3 Sep-25-23 Sep-27-23 2 IN-2500 Install Ceiling Tile - Storage / Hopper / Beverage Station / Bag Storage - Upper Level3 Sep-25-23 Sep-27-23 31 IN-10120 Fire Alarm Trim - Storage / Hopper / Beverage Station / Bag Storage - Upper Level3 Sep-25-23 Sep-27-23 2 IN-2550 Paint Touch-Up - Storage / Hopper / Beverage Station / B ag S torage - Upp er Level2 Sep-28-23 Sep-29-23 31 Men's & Women's Toilet Rm / All-Gen der RestroomsMen's & Women's Toilet Rm / All-Gen der Restrooms 26 Sep-12-23 Oct-17-23 19 IN-2190 Install Tile - Men's & Women's Toilet Room - Upper Level 8 Sep-12-23 Sep-21-23 0 IN-2200 Grout Tile - Men's & Women's Toilet Room - Upper Level 2 Sep-22-23 Sep-25-23 0 IN-2220 Install Toilets / Urinals - Men's & Women's Toilet Room - Upper Level 5 Sep-26-23 Oct-02-23 9 IN-2210 Install Light Fixtures / Fire Alarm Trim - Men's & Women's Toilet Room - Upper Level2 Sep-26-23 Sep-27-23 1 IN-4180 Field Measure Countertops - Men's & Women's T oilet Room - Upper Level 1 Sep-26-23 Sep-26-23 0 IN-2230 Install Mechanical Trim - Men's & Women's Toilet Room - Upper Level 2 Sep-28-23 Sep-29-23 1 IN-2240 Install Toilet Partitions - Men's & Women's Toilet Room - Upper Level 5 Oct-03-23 Oct-09-23 19 IN-2250 Install Toilet Accessories - Men's & Women's T oilet Room - Upper Level 4 Oct-10-23 Oct-13-23 19 IN-4190 Install Countertops - Men's & Women's T oilet Room - Upper Level 2 Oct-11-23 Oct-12-23 0 IN-4200 Install Sinks & Faucets - Men's & Women's T oilet Room - Upper Level 2 Oct-12-23 Oct-13-23 0 IN-2260 Paint Touch-Up - Men's & Women's Toilet Room - Upper Level 2 Oct-16-23 Oct-17-23 19 Event SpaceEvent Space 36 Sep-05-23 Oct-24-23 3
IN-2620 Ceiling Wal lpaper - Event Space - Upper Level 3 Sep-05-23 Sep-07-23 0 IN-2580 Install Millwork & Mirrors at Wall - Event Space - Upper Level 5 Sep-08-23 Sep-14-23 0 IN-2610 Install Wood Veneer - Event Space - Upper Level 6 Sep-08-23 Sep-15-23 18 IN-2630 Install Light Fixtures / Fire Alarm Trim - Event Space - Upper Level 5 Sep-08-23 Sep-14-23 3 IN-2640 Install Air Diffusers - Event Space - Upper Level 5 Sep-08-23 Sep-14-23 12 IN-2570 Install Wal l Coverings - Event Space - Upper Level 3 Sep-15-23 Sep-19-23 0 IN-2670 Install Carpet - Event Space - Upper Level 5 Sep-20-23 Sep-26-23 0 IN-2650 Electrical Trim - Event Space - Upper Level 3 Sep-27-23 Sep-29-23 0 IN-2680 Install Operable Partition - Event Space - Upper Level 8 Sep-27-23 Oct-06-23 3 IN-2590 Install Base - Event Space - Upper Level 2 Sep-27-23 Sep-28-23 9 IN-10130 Fire Alarm Trim - Event Space - Upper Level 3 Sep-27-23 Sep-29-23 0 IN-2660 Paint Touch-Up - Event Space - Upper Level 2 Oct-09-23 Oct-10-23 3 OFOI-11600Install Television (By Owner) - Event Space - Upper Level 10 Oct-11-23 Oct-24-23 3 Electrical RoomElectrical Room 41 Jun-22-23 Aug-18-23 28 IN-2320 Layout & Form Equipment Pads - Electrical Room - Upper Level 2 Jun-22-23 Jun-23-23 28 IN-2330 Drill & Epoxy Rebar for Equipment Pads - Electrical Room - Upper Level 2 Jun-26-23 Jun-27-23 28 IN-2340 Pour Equipment Pads - Electrical Room - Upper Level 1 Jun-28-23 Jun-28-23 28 IN-2350 Strip & Clean Equipment Pads - Electrical Room - Upper Level 1 Jun-29-23 Jun-29-23 28 IN-4820 Frame Wal ls - Electri c al Room - Upper Lev el 4 Jun-30-23 Jul-06-23 28 IN-4830 In Wall El ectrical - Electri c al Room - Upper Level 4 Jul-07-23 Jul-12-23 28 IN-4840 Install Backing & Blocking - Electrical Room - Upper Level 2 Jul-13-23 Jul-14-23 28 IN-4850 Hang Drywall - Electrical Room - Upper Level 2 Jul-17-23 Jul-18-23 28 IN-4860 Drywall Taping - Electri cal Room - Upper Level 4 Jul-19-23 Jul-24-23 28 IN-4870 Prime & 1st Coat Paint - Electrical Room - Upper Level 2 Jul-25-23 Jul-26-23 28 IN-2360 Set Electrical Panels - Electrical Room - Upper Level 3 Jul-27-23 Jul-31-23 28 IN-2370 Set & Anchor Electrical Equipment - Electrical Room - Upper Level 3 Aug-01-23 Aug-03-23 28 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Install Fire Sprinkler Heads - Storage / Hopper / Beverage Station / Bag Storage - Upper Level Hang Doors & Hardware - Storage / Hopper / Beverage Station / Bag Storage - Upper Level Electrical Trim - Storage / Hopper / Beverage Station / Bag Storage - Upper Level Install Ceiling Tile - Storage / Hopper / Beverage Station / Bag Storage - Upper Level Fire Alarm Trim - Storage / Hopper / Beverage Station / Bag Storage - Upper Level Paint Touch-Up - Stor age / Hopper / Beverage Station / Bag Storage - Upper Level Install Tile - Men's & Women's Toilet Room - Upper Level Grout Tile - Men's & Women's Toilet Room - Upper Level
Install Toilets / Urinals - Men's & Women's Toilet Room - Upper Level Install Light Fixtures / Fire Alarm Trim - Men's & Women's Toilet Room - Upper Level Field Measure Countertops - Men's & Women's T oilet Room - Upper Level Install Mechanical Trim - Men's & Women's Toilet Room - Upper Level Install Toilet Partitions - Men's & Women's Toilet Room - Upper Level Install Toilet Accessories - Men's & Women's T oilet Room - Upper Level Install Countertops - Men's & Women's T oilet Room - Upper Level Install Sinks & Faucets - Men's & Women's T oilet Room - Upper Level Paint Touch-Up - Men's & Women's Toilet Room - Upper Level Ceiling Wallpaper - Event Space - Upper Lev el
Install Millwork & Mirrors at Wall - Ev ent Space - Upper Lev el Install Wood Veneer - Event Space - Upper Level
Install Light Fixtures / Fire Alarm Trim - Event Space - Upper Level Install Air Diffusers - Event Space - Upper Level
Install Wall Coverings - Event Space - Upper Level
Install Carpet - Event Space - Upper Level
Electrical Trim - Event Space - Upper Level
Install Operable Partition - Event Space - Upper Level
Install Base - Event Space - Upper Level
Fire Alarm Trim - Event Space - Upper Level
Paint Touch-Up - Event Space - Upper Level
Install Television (By Owner) - Event Space - Upper Level Layout & Form Equipment Pads - Electrical Room - Upper Level Drill & Epoxy Rebar for Equipment Pads - Electrical Room - Upper Level Pour Equipment Pads - Electrical Room - Upper Level
Strip & Clean Equipment Pads - Electrical Room - Upper Level Frame Walls - Electric al Room - Upper Lev el
In Wall El ectrical - Electri c al Room - Upper Level
Install Backing & Blocking - Electrical Room - Upper Level Hang Drywall - Electrical Room - Upper Level
Drywall Taping - Electric al Room - Upper Level
Prime & 1st Coat Paint - Electrical Room - Upper Level
Set Electrical Panels - Electrical Room - Upper Level
Set & Anchor Electrical Equipment - Electrical Room - Upper Level Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 30 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 150 of 259 ends
Page 72 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
IN-2380 Hang Door & Hardware - Electrical Room - Upper Level 3 Aug-04-23 Aug-08-23 35 IN-2390 Rough-in Electrical Conduits to Panels / Equipment - Electrical Room - Upper Level3 Aug-04-23 Aug-08-23 28 IN-2400 Pull Wire & T erminate Electrical - Electrical Room - Upper Level 3 Aug-09-23 Aug-11-23 28 IN-2410 Install Light Fixtures - Electrical Room - Upper Level 2 Aug-14-23 Aug-15-23 28 IN-10140 Install Fire Alarm Trim - Electrical Room - Upper Level 2 Aug-14-23 Aug-15-23 28 IN-2430 Seal Concrete - Electrical Room - Upper Level 1 Aug-16-23 Aug-16-23 28 IN-2440 Install Vinyl Base - Electrical Room - Upper Level 1 Aug-17-23 Aug-17-23 28 IN-2420 Paint Touch-Up - Electrical Room - Upper Level 1 Aug-18-23 Aug-18-23 28 IN-2450 Ready T o Be Energiz ed - El ectrical Room - Electrical Room - Upper Level 0 Aug-18-23 28 HallwayHallway 9 Sep-13-23 Sep-25-23 35
IN-2270 Install Tile Flooring - Hallway - Upper Level 5 Sep-13-23 Sep-19-23 6 IN-2280 Install Light Fixtures / Fire Alarm Trim - Hallway - Upper Level 2 Sep-20-23 Sep-21-23 6 IN-2290 Mechanical Trim - Hallway - Upper Level 2 Sep-20-23 Sep-21-23 35 IN-2300 Install Base - Hallway - Upper Level 2 Sep-20-23 Sep-21-23 35 IN-2310 Paint Touch-Up - Hallway - Upper Level 2 Sep-22-23 Sep-25-23 35 Hitting BayHitting Bay 35 Sep-07-23 Oct-25-23 2
IN-2140 Install Light Fixtures / Fire Alarm Trim - Hitting Bay - Upper Level 4 Sep-07-23 Sep-12-23 11 IN-2150 Install Heaters - Hitting Bay - Upper Level 4 Sep-07-23 Sep-12-23 4 IN-2130 Install Basket Fans - Hitting Bay - Upper Level 4 Sep-11-23 Sep-14-23 9 IN-9990 Remove Protection & Final Polish Concrete - Hitting Bay - Upper Level 4 Sep-13-23 Sep-18-23 4 IN-2160 Paint Touch-Up - Hitting Bay - Upper Level 2 Sep-15-23 Sep-18-23 9 IN-2120 Metal Clad Column Enclosure - Hitting Bay - Upper Level 5 Sep-21-23 Sep-27-23 2 OFOI-11180Install Safety Catch Net (By Owner) - Hitting Bay - Upper Level 10 Sep-28-23 Oct-11-23 12 OFOI-1480 Hitting Bay Equipment (By Owner) - Hitting Bay - Upper Level 20 Sep-28-23 Oct-25-23 2 Elevator BuildoutElevator Buildout 75 Jun-29-23 Oct-13-23 8 ShaftShaft 16 Jun-29-23 Jul-21-23 22
EL-3210 Frame Elevator Shaft Walls 5 Jun-29-23 Jul-06-23 22 EL-3200 Hang Drywall at Elevator Shaft Walls 3 Jul-07-23 Jul-11-23 22 EL-3220 Drywall Taping at Elevator Shaft Walls 4 Jul-12-23 Jul-17-23 22 EL-3230 Install Elevator Pit Ladders 4 Jul-18-23 Jul-21-23 22 Elevator #1 (Crew #1)Elevator #1 (Crew #1) 45 Aug-11-23 Oct-13-23 8 EL-1890 Mobilize / Unload & Stage Equipment - Elevator 1 2 Aug-11-23 Aug-14-23 8 EL-2150 Install Rails - Elevator 1 4 Aug-15-23 Aug-18-23 8 EL-2470 Install Machine & Controller - Elevator 1 3 Aug-21-23 Aug-23-23 8 EL-2480 Install Car Sling & Frame - Elevator 1 4 Aug-24-23 Aug-29-23 8 EL-2490 Hoist and Cable - Elevator 1 3 Aug-30-23 Sep-01-23 8 EL-2500 Install Entrances / Doors / Fixtures - Elevator 1 4 Sep-05-23 Sep-08-23 8 EL-2510 Install Hoistway Equipment - Elevator 1 3 Sep-11-23 Sep-13-23 8 EL-2520 Rough-in Conduits / Pull Wire & Terminate - Elevator 1 3 Sep-14-23 Sep-18-23 8 EL-2530 Install Cab Finishes - Elevator 1 4 Sep-19-23 Sep-22-23 8 EL-3240 Frame Elevator Fronts - Elevator 1 2 Sep-25-23 Sep-26-23 8 EL-3270 Install Smoke Curtain - Elevator 1 2 Sep-27-23 Sep-28-23 8 EL-3250 Hang Drywall @ Elevator Fronts - Elevator 1 1 Sep-29-23 Sep-29-23 8 EL-3260 Drywall Taping @ Elevator Fronts - Elevator 1 3 Oct-02-23 Oct-04-23 8 EL-7030 Prime & Paint @ Elevator Fronts - Elevator 1 2 Oct-05-23 Oct-06-23 8 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Hang Door & Hardware - Electrical Room - Upper Level
Rough-in Electrical Conduits to Panels / Equipment - Electrical Room - Upper Level Pull Wire & T erminate Electrical - Electrical Room - Upper Level Install Light Fixtures - Electrical Room - Upper Level
Install Fire Alarm Trim - Electrical Room - Upper Level Seal Concrete - Electrical Room - Upper Level
Install Vinyl Base - Electrical Room - Upper Level
Paint Touch-Up - Electrical Room - Upper Level
Ready T o Be Energized - Electrical Room - Electrical Room - Upper Level Install Tile Flooring - Hallway - Upper Level
Install Light Fixtures / Fire Alarm Trim - Hallway - Upper Level Mechanical Trim - Hallway - Upper Level
Install Base - Hallway - Upper Level
Paint Touch-Up - Hal lway - Upper Level
Install Light Fixtures / Fire Alarm Trim - Hitting Bay - Upper Level Install Heaters - Hitting Bay - Upper Level
Install Basket Fans - Hitting Bay - Upper Level
Remove Protection & Final Polish Concrete - Hitting Bay - Upper Level Paint Touch-Up - Hitting Bay - Upper Level
Metal Clad Column Enclosure - Hitting Bay - Upper Level Install Safety Catch Net (By Owner) - Hitting Bay - Upper Level Hitting Bay Equipment (By Owner) - Hitting Bay - Upper Level Frame Elevator Shaft Walls
Hang Drywall at Elevator Shaft Walls
Drywall Taping at Elevator Shaft Walls
Install Elevator Pit Ladders
Mobilize / Unload & Stage Equipment - Elevator 1
Install Rails - Elevator 1
Install Machine & Controller - Elevator 1
Install Car Sling & Frame - Elevator 1
Hoist and Cable - Elevator 1
Install Entrances / Doors / Fixtures - Elevator 1
Install Hoistway Equipment - Elevator 1
Rough-in Conduits / Pull Wire & Terminate - Elev ator 1 Install Cab Finishes - Elevator 1
Frame Elevator Fronts - Elevator 1
Install Smoke Curtain - Elevator 1
Hang Drywall @ Elevator Fronts - Elevator 1
Drywall Taping @ Elevator Fronts - Elevator 1
Prime & Paint @ Elevator Fronts - Elevator 1
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 31 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 151 of 259 ends
Page 73 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
EL-2540 Test & Adjust - Elevator 1 5 Oct-09-23 Oct-13-23 8 Elevator #2 (Crew #2)Elevator #2 (Crew #2) 45 Aug-11-23 Oct-13-23 8 EL-1990 Mobilize / Unload & Stage Equipment - Elevator 2 2 Aug-11-23 Aug-14-23 8 EL-2000 Install Rails - Elevator 2 4 Aug-15-23 Aug-18-23 8 EL-2010 Install Machine & Controller - Elevator 2 3 Aug-21-23 Aug-23-23 8 EL-2020 Install Car Sling & Frame - Elevator 2 4 Aug-24-23 Aug-29-23 8 EL-2030 Hoist and Cable - Elevator 2 3 Aug-30-23 Sep-01-23 8 EL-2040 Install Entrances / Doors / Fixtures - Elevator 2 4 Sep-05-23 Sep-08-23 8 EL-2050 Install Hoistway Equipment - Elevator 2 3 Sep-11-23 Sep-13-23 8 EL-2060 Rough-in Conduits / Pull Wire & Terminate - Elevator 2 3 Sep-14-23 Sep-18-23 8 EL-2070 Install Cab Finishes - Elevator 2 4 Sep-19-23 Sep-22-23 8 EL-7040 Frame Elevator Fronts - Elevator 2 2 Sep-25-23 Sep-26-23 8 EL-7080 Install Smoke Curtain - Elevator 2 2 Sep-27-23 Sep-28-23 8 EL-7050 Hang Drywall @ Elevator Fronts - Elevator 2 1 Sep-29-23 Sep-29-23 8 EL-7060 Drywall Taping @ Elevator Fronts - Elevator 2 3 Oct-02-23 Oct-04-23 8 EL-7070 Prime & Paint @ Elevator Fronts - Elevator 2 2 Oct-05-23 Oct-06-23 8 EL-2080 Test & Adjust - Elevator 2 5 Oct-09-23 Oct-13-23 8 Parking AreaParking Area 210 Dec-14-22 Oct-10-23 24
Phase 1Phase 1 37 Dec-14-22 Feb-06-23 181
PA-2200 Stake & Layout Curb & Gutter - Parking Phase 1 10 Dec-14-22 Dec-28-22 49 PA-2170 Rough Underground Irrigation - Parking Phase 1 5 Dec-29-22 Jan-05-23 203 PA-2120 Underground Electrical - Parking Phase 1 5 Dec-29-22 Jan-05-23 181 PA-2130 Underground Storm Drain - Parking Phase 1 (#1) 5 Dec-29-22 Jan-05-23 49 PA-2180 Cut Grade Curb & Gutter - Parking Phase 1 2 Jan-06-23 Jan-09-23 181 PA-2090 Form, Pour & Strip Light Pole Bases - Parking Phase 1 4 Jan-10-23 Jan-13-23 194 PA-3410 Form, Pour & Strip Curb & Gutter - Parking Phase 1 7 Jan-10-23 Jan-18-23 181 PA-2160 Set Light Poles - Parking Phase 1 3 Jan-16-23 Jan-18-23 194 PA-2190 Backfill Curb & Gutter - Parking Phase 1 4 Jan-19-23 Jan-24-23 187 SG-1519 Fine Grade - Parking Lot Phase 1 10 Jan-19-23 Feb-01-23 181 PA-3310 Install Base for Asphalt Paving- Parking Phase 1 2 Feb-02-23 Feb-03-23 181 PA-2150 Asphalt Base Coat Paving - Parking Phase 1 1 Feb-06-23 Feb-06-23 181 Phase 2Phase 2 24 Mar-08-23 Apr-10-23 136
PA-3610 Rough-in Irrigation - Parking Phase 2 5 Mar-08-23 Mar-14-23 155 PA-3660 Rough-in Storm Drain - Parking Phase 2 10 Mar-08-23 Mar-21-23 16 PA-3920 Demo Existing Curb & Gutter - Parking Phase 2 2 Mar-08-23 Mar-09-23 120 PA-3930 Form, Pour & Rebar New Driveway - Parking Phase 2 3 Mar-10-23 Mar-14-23 120 PA-3940 Patch Asphalt - Parking Phase 2 1 Mar-15-23 Mar-15-23 120 PA-3450 Layout & Excavate Curb & Gutter - Parking Phase 2 3 Mar-22-23 Mar-24-23 116 PA-3460 Form Curb & Gutter - Parking Phase 2 2 Mar-27-23 Mar-28-23 116 PA-3480 Pour Curb & Gutter - Parking Phase 2 1 Mar-29-23 Mar-29-23 116 PA-3490 Backfill Curb & Gutter - Parking Phase 2 2 Mar-30-23 Mar-31-23 116 PA-3440 Fine Grade - Parking Phase 2 2 Apr-03-23 Apr-04-23 116 PA-3530 Install Base for Asphalt Paving - Parking Phase 2 2 Apr-05-23 Apr-06-23 116 PA-3540 Asphalt Base Coat Paving - Parking Phase 2 2 Apr-07-23 Apr-10-23 116 Phase 3Phase 3 142 Mar-22-23 Oct-10-23 24
Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Test & Adjust - Elevator 1
Mobilize / Unload & Stage Equipment - Elevator 2
Install Rails - Elevator 2
Install Machine & Controller - Elevator 2
Install Car Sling & Frame - Elevator 2
Hoist and Cable - Elevator 2
Install Entrances / Doors / Fixtures - Elevator 2
Install Hoistway Equipment - Elevator 2
Rough-in Conduits / Pull Wire & Terminate - Elev ator 2 Install Cab Finishes - Elevator 2
Frame Elevator Fronts - Elevator 2
Install Smoke Curtain - Elevator 2
Hang Drywall @ Elevator Fronts - Elevator 2
Drywall Taping @ Elevator Fronts - Elevator 2
Prime & Paint @ Elevator Fronts - Elevator 2
Test & Adjust - Elevator 2
Stake & Layout Curb & Gutter - Parking Phase 1
Rough Underground Irrigation - Parking Phase 1
Underground Electrical - Parking Phase 1
Underground Storm Drain - Parking Phase 1 (#1)
Cut Grade Curb & Gutter - Parking Phase 1
Form, Pour & Strip Light Pole Bases - Parking Phase 1
Form, Pour & Strip Curb & Gutter - Parking Phase 1
Set Light Poles - Parking Phase 1
Backfill Curb & Gutter - Parking Phase 1
Fine Grade - Parking Lot Phase 1
Install Base for Asphalt Paving- Parking Phase 1
Asphalt Base Coat Paving - Parking Phase 1
Rough-in Irrigation - Parking Phase 2
Rough-in Storm Drain - Parking Phase 2
Demo Existing Curb & Gutter - Parking Phase 2
Form, Pour & Rebar New Driveway - Parking Phase 2
Patch Asphalt - Parking Phase 2
Layout & Excavate Curb & Gutter - Parking Phase 2
Form Curb & Gutter - Parking Phase 2
Pour Curb & Gutter - Parking Phase 2
Backfill Curb & Gutter - Parking Phase 2
Fine Grade - Parking Phase 2
Install Base for Asphalt Paving - Parking Phase 2
Asphalt Base Coat Paving - Parking Phase 2
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 32 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 152 of 259 ends
Page 74 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
UT-2320 Set & Install Grease Interceptor - Site Utilities 10 Mar-22-23 Apr-04-23 16 UT-2260 Underground Storm Drain - Site Utilities (#7) 5 Jul-14-23 Jul-20-23 6 UT-2270 Underground Sewer - Site Utilities (#8) 4 Jul-21-23 Jul-26-23 6 UT-2240 Underground Domestic Water - Site Utilities (#8) 4 Jul-27-23 Aug-01-23 6 UT-2310 Underground Gas - Site Utilities 8 Aug-02-23 Aug-11-23 6 PA-3870 Rough-in Irrigation - Parking Phase 3 5 Aug-11-23 Aug-17-23 28 PA-3690 Rough-in Electrical - Parking Phase 3 5 Aug-11-23 Aug-17-23 0 UT-2250 Underground Fire Water - Site Utilities (#8) 5 Aug-14-23 Aug-18-23 6 PA-3710 Layout & Excavate Curb & Gutter - Parking Phase 3 4 Aug-18-23 Aug-23-23 0 PA-3770 Form Light Pole Bases - Parking Phase 3 2 Aug-24-23 Aug-25-23 9 PA-3720 Form & Pour Curb & Gutter - Parking Phase 3 5 Aug-24-23 Aug-30-23 0 PA-3960 Electrical Light Pole Bases - Parkign Phase 3 2 Aug-25-23 Aug-28-23 9 PA-3780 Pour Light Pole Bases - Parking Phase 3 1 Aug-29-23 Aug-29-23 9 PA-3750 Backfill Curb & Gutter - Parking Phase 3 2 Aug-31-23 Sep-01-23 0 PA-3700 Fine Grade - Parking Phase 3 2 Sep-05-23 Sep-06-23 0 PA-3910 Landscaping - Parking Phase 3 15 Sep-05-23 Sep-25-23 17 PA-3950 Form, Rebar & Pour Concrete Paving - Parking Phase 3 4 Sep-07-23 Sep-12-23 0 PA-3810 Form, Rebar & Pour Hardscape - Parking Phase 3 5 Sep-13-23 Sep-19-23 0 PA-3790 Install Base for Asphalt Paving - Parking Phase 3 3 Sep-20-23 Sep-22-23 0 PA-3800 Asphalt Paving Final Coat - Parking Phase 3 2 Sep-25-23 Sep-26-23 0 PA-3900 Pavement Striping - Parking Phase 3 2 Sep-27-23 Sep-28-23 32 PA-3860 Set Truncated Domes - Parking Phase 3 2 Sep-27-23 Sep-28-23 32 PA-3890 Precast Concrete Wheel Stop - Parking Phase 3 2 Sep-27-23 Sep-28-23 32 PA-3850 Set Light Poles - Parking Phase 3 3 Sep-27-23 Sep-29-23 0 PA-3880 Signage - Parking Phase 3 3 Sep-27-23 Sep-29-23 31 PA-3970 Install EV Chargers - Parking PHase 3 (By Owner) 10 Sep-27-23 Oct-10-23 13 Driving Range OutfieldDriving Range Outfield 232 Dec-14-22 Nov-09-23 32 Grading / Rough-ins / Target BasesGrading / Rough-ins / Target Bases 136 Dec-14-22 Jun-26-23 39 DR-1930 Rough Grade - Driving Range Outfield 5 Dec-14-22 Dec-20-22 59 DR-1937 Install Deep Storm Drain Piping - Driving Range Outfield (#2) 15 Jan-06-23 Jan-26-23 49 DR- 7110 Install Shallow Storm Drain Piping - Driving Range Outfield (#3) 10 Jan-27-23 Feb-09-23 49 DR-1934 Layout & Excavate Targets - Dri ving Range Outfield 5 Feb-10-23 Feb-16-23 49 DR-1947 Install Target Vaults & Final Connections - Driving Range Outfield (#3) 6 Apr-19-23 Apr-26-23 6 DR-1009 Install Targets Rings - Driving Range Outfield 20 Apr-27-23 May-24-23 39 DR-1950 Rough-in Underground Electrical - Driving Range Outfield 10 May-25-23 Jun-08-23 39 DR-1224 Prep for Concrete Target Bottom - Driving Range Outf ie ld 10 Jun-09-23 Jun-22-23 39 DR-1240 Pour Target Bases - Driving Range Outfield 2 Jun-23-23 Jun-26-23 39 South Side - Pole 25 to 15 (11)South Side - Pole 25 to 15 (11) 23 Jul-03-23 Aug-03-23 25 DR-1647 Survey Layout Pole Locations - South 1 Jul-03-23 Jul-03-23 8 DR-1648 Drill Pier / Set 1st Pole Section / Plumb & Line / Pour Concrete Footing - South (By Owner)4 Jul-05-23 Jul-10-23 8 DR-1649 Install Mid Pole Sections - South (By Owner) 3 Jul-11-23 Jul-13-23 9 DR-1960 Install Upper Pole Sections - South (By Owner) 5 Jul-14-23 Jul-20-23 25 DR-1650 Install Tie-Backs & Tension Cables - South (By Owner) 5 Jul-21-23 Jul-27-23 25 DR-1651 Install Netting - South (By Owner) 5 Jul-28-23 Aug-03-23 25 North Side 1 to 11 (11)North Side 1 to 11 (11) 26 Jul-05-23 Aug-09-23 21 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Set & Install Grease Interceptor - Site Utilities
Underground Storm Drain - Site Utilities (#7)
Underground Sewer - Site Utilities (#8)
Underground Domestic Water - Site Utilities (#8)
Underground Gas - Site Utilities
Rough-in Irrigation - Parking Phase 3
Rough-in Electrical - Parking Phase 3
Underground Fire Water - Site Utilities (#8)
Layout & Excavate Curb & Gutter - Parking Phase 3
Form Light Pole Bases - Parking Phase 3
Form & Pour Curb & Gutter - Parking Phase 3
Electrical Light Pole Bases - Parkign Phase 3
Pour Light Pole Bases - Parking Phase 3
Backfill Curb & Gutter - Parking Phase 3
Fine Grade - Parking Phase 3
Landscaping - Parking Phase 3
Form, Rebar & Pour Concrete Paving - Parking Phase 3
Form, Rebar & Pour Hardscape - Parking Phase 3
Install Base for Asphalt Paving - Parking Phase 3
Asphalt Paving Final Coat - Parking Phase 3
Pavement Striping - Parking Phase 3
Set Truncated Domes - Parking Phase 3
Precast Concrete Wheel Stop - Parking Phase 3
Set Light Poles - Parking Phase 3
Signage - Parking Phase 3
Install EV Chargers - Parking PHase 3 (By Owner)
Rough Grade - Driving Range Outfield
Install Deep Storm Drain Piping - Driving Range Outfield (#2) Install Shallow Storm Drain Piping - Driving Range Outfield (#3) Layout & Excavate Targets - Driv ing Range Outfield
Install Target Vaults & Final Connections - Driving Range Outfield (#3) Install Targets Rings - Dri v ing Range Outfield
Rough-in Underground Electrical - Driving Range Outfield Prep for Concrete Target Bottom - Driving Range Outf ie ld Pour Target Bases - Drivi ng Range Outfield
Survey Layout Pole Locations - South
Drill Pier / Set 1st Pole Section / Plumb & Line / Pour Concrete Footing - South (By Owner) Install Mid Pole Sections - South (By Owner)
Install Upper Pole Sections - South (By Owner)
Install Tie-Backs & Tension Cables - South (By Owner)
Install Netting - South (By Owner)
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 33 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 153 of 259 ends
Page 75 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
DR-1652 Survey Layout Pole Locations - North 1 Jul-05-23 Jul-05-23 11 DR-1653 Drill Pier / Set 1st Pole Section / Plumb & Line / Pour Concrete Footing - North (By Owner)4 Jul-11-23 Jul-14-23 8 DR-1654 Install Mid Pole Sections - North (By Owner) 3 Jul-17-23 Jul-19-23 8 DR-1970 Install Upper Pole Sections - North (By Owner) 5 Jul-20-23 Jul-26-23 21 DR-1655 Install Tie-Backs & Tension Cables - North (By Owner) 5 Jul-27-23 Aug-02-23 21 DR-1656 Install Netting - North (By Owner) 5 Aug-03-23 Aug-09-23 21 East End - Poles 14 to 12 (3)East End - Poles 14 to 12 (3) 27 Jul-06-23 Aug-11-23 19 DR-1657 Survey Layout Pole Locations - East End 1 Jul-06-23 Jul-06-23 16 DR-1658 Drill Pier / Set 1st Pole Section / Plumb & Line / Pour Concrete Footing - East End (By Owner)1 Jul-17-23 Jul-17-23 10 DR-1659 Install Mid Pole Sections - East End (By Owner) 5 Jul-20-23 Jul-26-23 8 DR-1980 Install Upper Pole Sections - East End (By Owner) 5 Jul-27-23 Aug-02-23 8 DR-1660 Install Tie-Backs & Tension Cables - East End (By Owner) 5 Aug-03-23 Aug-09-23 8 DR-1661 Install Netting - East End (By Owner) 2 Aug-10-23 Aug-11-23 19 Tar ge ts / TurfTar ge ts / Turf 65 Aug-10-23 Nov-09-23 32 DR-1226 Backfill & Fine Grade Target & Driving Range - Driving Range Outfield 5 Aug-10-23 Aug-16-23 8 DR-1990 Rough-in Underground Electrical / Data Conduits - Driving Range Outfield 8 Aug-17-23 Aug-28-23 8 DR-2000 Set Storm Drain Elevations & Concrete Ring - Driving Range Outfield 8 Aug-21-23 Aug-30-23 6 DR-1940 Install Base & Asphalt Paving - Driving Range Outfield 15 Aug-31-23 Sep-21-23 6 DR-7090 Paint Targets - Driving Range Outfield 5 Sep-22-23 Sep-28-23 6 DR-1942 Tur f S yst em ( By O wn er ) - Dr iv in g Rang e O ut fiel d15 Sep-29-23 Oct-19-23 6 DR-1280 Low Voltage Hook-up (By Owner) - Driving Range Outfield 30 Sep-29-23 Nov-09-23 32 MEP Start-up & TestingMEP Start-up & Testing 15 Oct-02-23 Oct-20-23 2 ElectricalElectrical 5 Oct-02-23 Oct-06-23 0
MEP-2270 Pre-Functional Testi ng Electrical Sy stem 5 Oct-02-23 Oct-06-23 0 PlumbingPlumbing 5 Oct-16-23 Oct-20-23 2
MEP-2290 Pre-Functional Testi ng Plumbing Sy stem 5 Oct-16-23 Oct-20-23 0 MEP-2680 Flush & Clean / Chlorination Domestic Water System 2 Oct-16-23 Oct-17-23 2 MEP-2690 Generate Chlorination Report 2 Oct-18-23 Oct-19-23 2 MEP-2700 Approve Chlorination Report 1 Oct-20-23 Oct-20-23 2 MechanicalMechanical 14 Oct-03-23 Oct-20-23 0
MEP-2300 Pre-Functional Testi ng Mechanical System 3 Oct-03-23 Oct-05-23 0 MEP-2380 HVAC Air Balance - Lower Level 3 Oct-05-23 Oct-09-23 0 MEP-2390 HVAC Air Balance - Middle Level 3 Oct-10-23 Oct-12-23 0 MEP-2400 HVAC Air Balance - Upper Level 3 Oct-13-23 Oct-17-23 0 MEP-6190 Generate & Submit HVAC Air Balance Report 2 Oct-18-23 Oct-19-23 0 MEP-6200 Approve HVAC Air Balance Report 1 Oct-20-23 Oct-20-23 0 KitchenKitchen 2 Oct-17-23 Oct-18-23 0
MEP-2670 Pre-Functional Testi ng Kitchen Equipment 2 Oct-17-23 Oct-18-23 0 Fire Ala rmFire Ala rm 3 Oct-18-23 Oct-20-23 1
MEP-2310 Pre-Functional Testi ng Fire Alarm System 3 Oct-18-23 Oct-20-23 1 InspectionsInspections 16 Oct-09-23 Oct-30-23 0
A12450 Final Inspection - Fire Sprinkler System 3 Oct-09-23 Oct-11-23 8 A12520 Final Inspection - Electrical System 3 Oct-09-23 Oct-11-23 8 A12630 Health Department Pre-Inspection 1 Oct-19-23 Oct-19-23 0 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Survey Layout Pole Locations - North
Drill Pier / Set 1st Pole Section / Plumb & Line / Pour Concrete Footing - North (By Owner) Install Mid Pole Sections - North (By Owner)
Install Upper Pole Sections - North (By Owner)
Install Tie-Backs & Tension Cables - North (By Owner)
Install Netting - North (By Owner)
Survey Layout Pole Locations - East End
Drill Pier / Set 1st Pole Section / Plumb & Line / Pour Concrete Footing - East End (By Owner) Install Mid Pole Sections - East End (By Owner)
Install Upper Pole Sections - East End (By Owner)
Install Tie-Backs & Tension Cables - East End (By Owner) Install Netting - East End (By Owner)
Backfill & Fine Grade Target & Driving Range - Driving Range Outfield Rough-in Underground Electrical / Data Conduits - Driving Range Outfield Set Storm Drain Elevations & Concrete Ring - Driving Range Outfield Install Base & Asphalt Paving - Driving Range Outfield
Paint Targets - Driving Range Outfield
Turf System (By Owner) - Drivi ng Range Outfield
Low Voltage Hook-up (By Owner) - Driving Range Outfield Pre-Functional Testing Electr ical Sys tem
Pre-Functional Testing Plumbing Sys tem
Flush & Clean / Chlorination Domestic Water System
Generate Chlorination Report
Approve Chlorination Report
Pre-Functional Testing Mechanical System
HVAC Air Balanc e - Lower Level
HVAC Air Balanc e - Middle Level
HVAC Air Balanc e - Upper Level
Generate & Submit HVAC Ai r Bal ance Report
Approve HVAC Air Balanc e Report
Pre-Functional Testi ng Kitchen Equipment
Pre-Functional Testing Fire Alarm System
Final Inspection - Fire Sprinkler System
Final Inspection - Electrical System
Health Department Pre-Inspection
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 34 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 154 of 259 ends
Page 76 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Schedule
Activity ID Activity Name Orig
Dur
Start Finish Total
Float
A12650 Health Department Corrections 5 Oct-20-23 Oct-26-23 0 A12460 Final Inspection - Plumbing System 3 Oct-23-23 Oct-25-23 2 A12470 Final Inspection - Mechanical System 2 Oct-23-23 Oct-24-23 0 A14940 Health Department Inspection (Potable Water/Rec laimed Water Cross Connection)5 Oct-23-23 Oct-27-23 0 A12480 Final Inspection - Fire Alarm System 2 Oct-24-23 Oct-25-23 0 A12490 Elevator State Inspection 2 Oct-26-23 Oct-27-23 0 A12510 Health Department Final Inspection (Restaurant/Kitchen) 1 Oct-27-23 Oct-27-23 0 A12500 Building Final Inspection 1 Oct-30-23 Oct-30-23 0 Punchlist & CorrectionsPunchlist & Corrections 42 Oct-02-23 Dec-01-23 19 Lower LevelLower Level 30 Oct-18-23 Dec-01-23 19
PL-2530 McCarthy Punchlist & Corrections - Lower Level 10 Oct-18-23 Oct-31-23 19 PL-2540 A/E Punchlist - Lower Level 5 Nov-01-23 Nov-07-23 19 PL-2550 A/E Punchlist Corrections - Lower Level 15 Nov-08-23 Dec-01-23 19 Middle LevelMiddle Level 30 Oct-18-23 Dec-01-23 19
PL-2560 McCarthy Punchlist & Corrections - Middle Level 10 Oct-18-23 Oct-31-23 19 PL-2570 A/E Punchlist - Middle Level 5 Nov-01-23 Nov-07-23 19 PL-2580 A/E Punchlist Corrections - Middle Level 15 Nov-08-23 Dec-01-23 19 Upper LevelUpper Level 30 Oct-18-23 Dec-01-23 19
PL-2590 McCarthy Punchlist & Corrections - Upper Level 10 Oct-18-23 Oct-31-23 19 PL-2600 A/E Punchlist - Upper Level 5 Nov-01-23 Nov-07-23 19 PL-2610 A/E Punchlist Corrections - Upper Level 15 Nov-08-23 Dec-01-23 19 ExteriorExterior 30 Oct-02-23 Nov-10-23 31
PL-3170 McCarthy Punchlist & Corrections - Exterior 10 Oct-02-23 Oct-13-23 31 PL-3180 A/E Punchlist - Exterior 5 Oct-16-23 Oct-20-23 31 PL-3190 A/E Punchlist Corrections - Exterior 15 Oct-23-23 Nov-10-23 31 CommissioningCommissioning 30 Nov-15-23 Dec-29-23 0
Electrical SystemElectrical System 15 Nov-15-23 Dec-07-23 0 COM-2320 Functional Performance Testing Electrical System 15 Nov-15-23 Dec-07-23 0 Fire Sprinkler SystemFire Sprinkler System 15 Nov-15-23 Dec-07-23 15 COM-2330 Functional Performance Testing Fire Sprinkler Sy stem 15 Nov-15-23 Dec-07-23 15 Plumbing SystemPlumbing System 15 Nov-15-23 Dec-07-23 15 COM-2340 Functional Performance Testing Plumbi ng System 15 Nov-15-23 Dec-07-23 15 Mechanical SystemMechanical System 15 Nov-15-23 Dec-07-23 15 COM-2350 Functional Performance Testing Mechanical System 15 Nov-15-23 Dec-07-23 15 Fire Alarm SystemFire Alarm System 15 Dec-08-23 Dec-29-23 0 COM-2360 Functional Performance Testing Fire Alarm System 15 Dec-08-23 Dec-29-23 0 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2023 2024
Health Department Corrections
Final Inspection - Plumbing System
Final Inspection - Mechanical System
Health Department Inspection (Potable Water/Rec laimed Water Cross Connection) Final Inspection - Fire Alarm System
Elevator State Inspection
Health Department Final Inspection (Restaurant/Kitchen) Building Final Inspection
McCarthy Punchlist & Corrections - Lower Level
A/E Punchlist - Lower Level
A/E Punchlist Corrections - Lower Level
McCarthy Punchlist & Corrections - Middle Level
A/E Punchlist - Middle Level
A/E Punchlist Corrections - Middle Level
McCarthy Punchlist & Corrections - Upper Level
A/E Punchlist - Upper Level
A/E Punchlist Corrections - Upper Level
McCarthy Punchlist & Corrections - Exterior
A/E Punchlist - Exterior
A/E Punchlist Corrections - Exterior
Functional Performance Testing Electrical System
Functional Performance Testing Fire Sprinkler Sys tem
Functional Performance Testing Plumbing System
Functional Performance Testing Mechanical System
Functional Performance Testing Fire Alarm System
Project ID: 7791MSTR McCarthy Building Companies, Inc. Page 35 of 35 Pages Run Date - Oct-28-22
Start Date - Sep-19-22
Finish Date - Dec-29-23
Data Date - Sep-26-22
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Topgolf Montebello
All Activities

Page 155 of 259 ends

8 DOCUMENT LISTING

Page 156 of 259 ends
Page 78 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Document Listing
DRAWING NO. DRAWING TITLE DRAWING SET DRAWING DATE
T1.1 TITLE SHEET PERMIT COMMENTS II 9/6/2022
AB1.1 ABBREVIATION AND SYMBOLS SHEET ISSUE PERMIT / GMAX 6/6/2022 CAG1.1 CALGREEN CHECKLIST PERMIT COMMENTS II 9/6/2022
CAG2.1 CALGREN MANDATORY MEASURES PERMIT COMMENTS II 9/6/2022 CAG2.2 CALGREN MANDATORY MEASURES PERMIT COMMENTS II 9/6/2022 CAG2.3 CALGREN MANDATORY MEASURES PERMIT COMMENTS II 9/6/2022 CAG3.1 CALGREN MANDATORY MEASURES PERMIT COMMENTS II 9/6/2022 CAG3.2 CALGREN MANDATORY MEASURES PERMIT COMMENTS II 9/6/2022 CX3.1 COMMISSIONING CERTIFICATE PERMIT COMMENTS II 9/6/2022 CX3.2 COMMISSIONING CERTIFICATE PERMIT COMMENTS II 9/6/2022 EO1.1 ENERGY MODEL OUTPUT REPORT 1 PERMIT COMMENTS II 9/6/2022 EO1.2 ENERGY MODEL OUTPUT REPORT 2 PERMIT COMMENTS II 9/6/2022 EO1.3 ENERGY MODEL OUTPUT REPORT 3 PERMIT COMMENTS II 9/6/2022 EM1.0 ADA SIGNAGE DETAILS ISSUE PERMIT / GMAX 6/6/2022
EM1.1 OCCUPANCY PLANS ISSUE PERMIT / GMAX 6/6/2022
EM1.1a OCCUPANCY PLANS ISSUE PERMIT / GMAX 6/6/2022
EM1.2 EGRESS PLANS PERMIT COMMENTS II 9/6/2022
EM1.2a FIREPROOFING PLANS PERMIT COMMENTS II 9/6/2022
EM1.3 FIRE STOPPING DETAILS ISSUE PERMIT / GMAX 6/6/2022 EM1.4 FIRE STOPPING DETAILS ISSUE PERMIT / GMAX 6/6/2022 EM1.5 FIRE STOPPING DETAILS ISSUE PERMIT / GMAX 6/6/2022 EM1.6 FIRE STOPPING DETAILS ISSUE PERMIT / GMAX 6/6/2022 EM1.7 FIRE STOPPING DETAILS ISSUE PERMIT / GMAX 6/6/2022 EM1.8 ACCESSIBLE SEATING PLANS PERMIT COMMENTS II 9/6/2022 EM1.9 FIRE STOPPING DETAILS ISSUE PERMIT / GMAX 6/6/2022 EM1.10 FIRE STOPPING DETAILS ISSUE PERMIT / GMAX 6/6/2022 EM1.11 FIRE STOPPING DETAILS ISSUE PERMIT / GMAX 6/6/2022 EM1.12 FIRE STOPPING DETAILS ISSUE PERMIT / GMAX 6/6/2022 EM1.13 FIRE STOPPING DETAILS ISSUE PERMIT / GMAX 6/6/2022 SP1.1 SITE PLAN ISSUE PERMIT / GMAX 6/6/2022
SP1.2 ENLARGED PATIO PLANS ISSUE PERMIT / GMAX 6/6/2022 RS1.1 RESPONSIBILITY SCHEDULE SHEET PERMIT COMMENTS II 9/6/2022 RS1.2 RESPONSIBILITY SCHEDULE SHEET PERMIT COMMENTS II 9/6/2022 A1.0 CURB AND SLAB PLANS ISSUE PERMIT / GMAX 6/6/2022
A1.1a GROUND LEVEL PARTIAL FLOOR PLAN ISSUE PERMIT / GMAX 6/6/2022 A1.1b GROUND LEVEL PARTIAL FLOOR PLAN ISSUE PERMIT / GMAX 6/6/2022 A1.1c GROUND LEVEL PARTIAL FLOOR PLAN ISSUE PERMIT / GMAX 6/6/2022 A1.1d GROUND LEVEL PARTIAL FLOOR PLAN ISSUE PERMIT / GMAX 6/6/2022 A1.2a MIDDLE LEVEL FLOOR PLAN ISSUE PERMIT / GMAX 6/6/2022 A1.2b MIDDLE LEVEL FLOOR PLAN ISSUE PERMIT / GMAX 6/6/2022 A1.2c MIDDLE LEVEL FLOOR PLAN ISSUE PERMIT / GMAX 6/6/2022 A1.2d MIDDLE LEVEL FLOOR PLAN ISSUE PERMIT / GMAX 6/6/2022 A1.3a UPPER LEVEL FLOOR PLAN ISSUE PERMIT / GMAX 6/6/2022 A1.3b UPPER LEVEL FLOOR PLAN ISSUE PERMIT / GMAX 6/6/2022 A1.3c UPPER LEVEL FLOOR PLAN ISSUE PERMIT / GMAX 6/6/2022 A1.3d UPPER LEVEL FLOOR PLAN ISSUE PERMIT / GMAX 6/6/2022

Page 1 of 10 ends
Page 157 of 259 ends
Page 79 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Document Listing
DRAWING NO. DRAWING TITLE DRAWING SET DRAWING DATE
A2.1a GROUND LEVEL PARTIAL RCP ISSUE PERMIT / GMAX 6/6/2022 A2.1b GROUND LEVEL PARTIAL RCP ISSUE PERMIT / GMAX 6/6/2022 A2.1c GROUND LEVEL PARTIAL LIGHTING DIMENSION PLAN IS SUE PERMIT / GMAX 6/6/2022 A2.1d GROUND LEVEL PARTIAL LIGHTING DIMENSION PLAN IS SUE PERMIT / GMAX 6/6/2022 A2.2a MIDDLE LEVEL PARTIAL RCP PERMIT COMMENTS II 9/6/2022 A2.2b MIDDLE LEVEL PARTIAL RCP PERMIT COMMENTS II 9/6/2022 A2.2c MIDDLE LEVEL PARTIAL LIGHTING DIMENSION PLAN PE RMIT COMMENTS II 9/6/2022 A2.2d MIDDLE LEVEL PARTIAL LIGHTING DIMENSION PLAN PE RMIT COMMENTS II 9/6/2022 A2.3a UPPER LEVEL PARTIAL RCP PERMIT COMMENTS II 9/6/2022 A2.3b UPPER LEVEL PARTIAL RCP PERMIT COMMENTS II 9/6/2022 A2.3c UPPER LEVEL PARTIAL LIGHTING DIMENSION PLAN PER MIT COMMENTS II 9/6/2022 A2.3d UPPER LEVEL PARTIAL LIGHTING DIMENSION PLAN PER MIT COMMENTS II 9/6/2022 A2.4 LIGHT FXTURE SCHEDULE ISSUE PERMIT / GMAX 6/6/2022 A3.1a PARTIAL ROOF PLAN ISSUE PERMIT / GMAX 6/6/2022
A3.1b PARTIAL ROOF PLAN ISSUE PERMIT / GMAX 6/6/2022
A3.2 ROOF DETAILS ISSUE PERMIT / GMAX 6/6/2022
A3.3 ROOF DETAILS ISSUE PERMIT / GMAX 6/6/2022
A3.4 ROOF DETAILS ISSUE PERMIT / GMAX 6/6/2022
A4.1 EXTERIOR ELEVATIONS ISSUE PERMIT / GMAX 6/6/2022
A4.2 EXTERIOR ELEVATIONS ISSUE PERMIT / GMAX 6/6/2022
A4.3 EXTERIOR ELEVATIONS ISSUE PERMIT / GMAX 6/6/2022
A5.1 BUILDING SECTIONS ISSUE PERMIT / GMAX 6/6/2022
A5.2 BUILDING SECTIONS ISSUE PERMIT / GMAX 6/6/2022
A6.1 WALL SECTIONS ISSUE PERMIT / GMAX 6/6/2022
A6.2 WALL SECTIONS ISSUE PERMIT / GMAX 6/6/2022
A6.3 WALL SECTIONS ISSUE PERMIT / GMAX 6/6/2022
A6.4 WALL SECTIONS ISSUE PERMIT / GMAX 6/6/2022
A6.5 WALL SECTIONS ISSUE PERMIT / GMAX 6/6/2022
A6.6 WALL SECTIONS ISSUE PERMIT / GMAX 6/6/2022
A7.1 EXTERIOR DETAILS ISSUE PERMIT / GMAX 6/6/2022
A7.2 EXTERIOR DETAILS ISSUE PERMIT / GMAX 6/6/2022
A7.3 EXTERIOR DETAILS ISSUE PERMIT / GMAX 6/6/2022
A7.4 EXTERIOR DETAILS ISSUE PERMIT / GMAX 6/6/2022
A7.5 EXTERIOR DETAILS ISSUE PERMIT / GMAX 6/6/2022
A7.6 EXTERIOR DETAILS ISSUE PERMIT / GMAX 6/6/2022
A7.7 EXTERIOR DETAILS ISSUE PERMIT / GMAX 6/6/2022
A8.1 ENLARGED TOILET ROOM PLANS ISSUE PERMIT / GMAX 6/6/2022 A8.2 TOILET ROOM ELEVATIONS ISSUE PERMIT / GMAX 6/6/2022 A8.3 ENLARGED STAIR PLANS ISSUE PERMIT / GMAX 6/6/2022
A8.4 STAIR SECTIONS & DETAILS ISSUE PERMIT / GMAX 6/6/2022 A8.5 ELEVATOR PLANS & SECTIONS ISSUE PERMIT / GMAX 6/6/2022 A8.6 STAIR SECTIONS & DETAILS ISSUE PERMIT / GMAX 6/6/2022 A9.1 ROOM SCHEDULE ISSUE PERMIT / GMAX 6/6/2022

Page 2 of 10 ends
Page 158 of 259 ends
Page 80 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Document Listing
DRAWING NO. DRAWING TITLE DRAWING SET DRAWING DATE
A9.1a FINISH SCHEDULE ISSUE PERMIT / GMAX 6/6/2022
A9.2 DOOR SCHEDULE ISSUE PERMIT / GMAX 6/6/2022
A9.3 WINDOW SCHEDULES ISSUE PERMIT / GMAX 6/6/2022
A9.4 WINDOW SCHEDULES ISSUE PERMIT / GMAX 6/6/2022
A9.5 DOOR & WINDOW DETAILS ISSUE PERMIT / GMAX 6/6/2022 A10.1 INTERIOR ELEVATIONS ISSUE PERMIT / GMAX 6/6/2022
A10.2 INTERIOR ELEVATIONS ISSUE PERMIT / GMAX 6/6/2022
A10.3 INTERIOR ELEVATIONS ISSUE PERMIT / GMAX 6/6/2022
A10.4 INTERIOR ELEVATIONS ISSUE PERMIT / GMAX 6/6/2022
A11.1 INTERIOR DETAILS & WALL TYPES ISSUE PERMIT / GMAX 6/6/2022 A11.2 ENLARGED EVENT SPACE RCP ISSUE PERMIT / GMAX 6/6/2022 A11.3 GROUND LEVEL BAR PLAN & DETAILS ISSUE PERMIT / GMAX 6/6/2022 A11.4 UPPER LEVEL BAR PLAN, RCP & DETAILS ISSUE PERMIT / GMAX 6/6/2022 A11.5 MIDDLE LEVEL BAR DETAILS ISSUE PERMIT / GMAX 6/6/2022 A11.6 MILLWORK DETAILS ISSUE PERMIT / GMAX 6/6/2022
A11.7 ENLARGED LOBBY RCP & MILLWORK DETAILS ISSUE PERMIT / GMAX 6/6/2022 A11.8 SEISMIC BRACING DETAILS ISSUE PERMIT / GMAX 6/6/2022 A12.1a GROUND LEVEL FINISH PLAN ISSUE PERMIT / GMAX 6/6/2022 A12.1b GROUND LEVEL FINISH PLAN ISSUE PERMIT / GMAX 6/6/2022 A12.1c GROUND LEVEL SEATING PLAN ISSUE PERMIT / GMAX 6/6/2022 A12.1d GROUND LEVEL SETAING PLAN ISSUE PERMIT / GMAX 6/6/2022 A12.2a MIDDLE LEVEL FINISH PLAN ISSUE PERMIT / GMAX 6/6/2022 A12.2b MIDDLE LEVEL FINISH PLAN ISSUE PERMIT / GMAX 6/6/2022 A12.2c MIDDLE LEVEL FINISH PLAN ISSUE PERMIT / GMAX 6/6/2022 A12.2d MIDDLE LEVEL FINISH PLAN ISSUE PERMIT / GMAX 6/6/2022 A12.3a UPPER LEVEL FINISH PLAN ISSUE PERMIT / GMAX 6/6/2022 A12.3b UPPER LEVEL FINISH PLAN ISSUE PERMIT / GMAX 6/6/2022 A12.3c UPPER LEVEL FINISH PLAN ISSUE PERMIT / GMAX 6/6/2022 A12.3d UPPER LEVEL SEATING PLAN ISSUE PERMIT / GMAX 6/6/2022 A12.4 FLOOR TRANSITION & DRAIN DETAILS ISSUE PERMIT / GMAX 6/6/2022 A12.5 FURNITURE SCHEDULE ISSUE PERMIT / GMAX 6/6/2022
G1.1 SPECIFICATIONS ISSUE PERMIT / GMAX 6/6/2022
G1.2 SPECIFICATIONS ISSUE PERMIT / GMAX 6/6/2022
G1.3 SPECIFICATIONS ISSUE PERMIT / GMAX 6/6/2022
G1.4 SPECIFICATIONS ISSUE PERMIT / GMAX 6/6/2022
G1.5 SPECIFICATIONS ISSUE PERMIT / GMAX 6/6/2022
G1.6 SPECIFICATIONS ISSUE PERMIT / GMAX 6/6/2022
G1.7 SPECIFICATIONS ISSUE PERMIT / GMAX 6/6/2022
G1.8 SPECIFICATIONS ISSUE PERMIT / GMAX 6/6/2022
RGP 1 OF 4 ROUGH GRADING PLANS 9/6/2022
RGP 2 OF 4 ROUGH GRADING PLANS 9/6/2022
RGP 3 OF 4 ROUGH GRADING PLANS 9/6/2022
RGP 4 OF 4 ROUGH GRADING PLANS 9/6/2022
1 OF 1 EARTHWORK - VENUE ROUGH GRADING ISSUED IN ADDENDUM #3 8/16/2022 1 OF 1 DRY UTILITY COMPOSITE - CDUMA-TG ISSUED IN ADDENDUM #3 7/9/2022 1 OF 1 EARTHWORK - CLUBHOUSE ROUGH GRADING ISSUED IN ADDENDUM #3 8/16/2022

Page 3 of 10 ends
Page 159 of 259 ends
Page 81 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Document Listing
DRAWING NO. DRAWING TITLE DRAWING SET DRAWING DATE
1 OF 31 TITLE SHEET 9/6/2022
2 OF 31 EXISTING SITE & DEMOLITION PLAN 9/6/2022
3 OF 31 EXISTING SITE & DEMOLITION PLAN 9/6/2022
4 OF 31 HORIZONTAL CONTROL PLAN 9/6/2022
5 OF 31 HORIZONTAL CONTROL PLAN 9/6/2022
6 OF 31 PRECISE GRADING PLAN 9/6/2022
7 OF 31 PRECISE GRADING PLAN 9/6/2022
8 OF 31 PRECISE GRADING PLAN 9/6/2022
9 OF 31 PRECISE GRADING PLAN 9/6/2022
10 OF 31 PRECISE GRADING PLAN 9/6/2022
11 OF 31 PRECISE GRADING PLAN 9/6/2022
12 OF 31 CROSS SECTIONS 9/6/2022
13 OF 31 TARGET SD PLAN 9/6/2022
14 OF 31 STORM DRAIN DETAILS 9/6/2022
15 OF 31 TARGET SD PROFILES 9/6/2022
16 OF 31 PARKING LOT SD 9/6/2022
16 OF 31 PARKING LOT SD - DRC MARKUP ISSUED IN ADDENDUM #3 9/6/2022 17 OF 31 OUTFIELD SD 9/6/2022
OUTFIELD SD - DRC MARKUP ISSUED IN ADDENDUM #3 9/6/2022 18 OF 31 STORM DRAIN PROFILES 9/6/2022
19 OF 31 STORM DRAIN PROFILES 9/6/2022
20 OF 31 STORM DRAIN PROFILES 9/6/2022
21 OF 31 UTILITY PLAN 9/6/2022
21 OF 31 UTILITY PLAN - DRC MARKUP ISSUED IN ADDENDUM #3 9/6/2022 22 OF 31 TARGET DETAIL 9/6/2022
23 OF 31 DETAILS 9/6/2022
24 OF 31 DETAILS 9/6/2022
25 OF 31 DETAILS 9/6/2022
26 OF 31 DETAILS 9/6/2022
27 OF 31 DETAILS 9/6/2022
28 OF 31 DETAILS 9/6/2022
29 OF 31 DETAILS 9/6/2022
30 OF 31 EROSION CONTROL PLAN 9/6/2022
31 OF 31 EROSION CONTROL PLAN 9/6/2022
E0.00 LEGEND AND ABBREVIATIONS PERMIT RESUBMITTAL #2 9/6/2022 E0.01 SPECIFICATIONS PERMIT RESUBMITTAL #2 9/6/2022
E0.02 SPECIFICATIONS PERMIT RESUBMITTAL #2 9/6/2022
E0.03 SPECIFICATIONS PERMIT RESUBMITTAL #2 9/6/2022
E1.00 SITE PLAN PERMIT RESUBMITTAL #2 9/6/2022
E1.01 SITE PLAN PHOTOMETRICS PERMIT RESUBMITTAL #2 9/6/2022 E1.02 SITE LIGHTING FIXTURE CUTSHEETS PERMIT RESUBMITTAL #2 9/6/2022 E1.03 LIGHT FIXTURE SCHEDULE PERMIT RESUBMITTAL #2 9/6/2022 E1.04 LOWER LEVEL INTERIOR EGRESS PHOTOMETRICS PERMIT RESUBMITTAL #2 9/6/2022 E1.05 MIDDLE LEVEL INTERIOR EGRESS PHOTOMETRICS PERMI T RESUBMITTAL #2 9/6/2022

Page 4 of 10 ends

17 OF 31

Page 160 of 259 ends
Page 82 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Document Listing
DRAWING NO. DRAWING TITLE DRAWING SET DRAWING DATE
E1.06 UPPER LEVEL INTERIOR EGRESS PHOTOMETRICS PERMIT RESUBMITTAL #2 9/6/2022 E2.11 LOWER LEVEL PARTIAL LIGHTING SECTION B PERMIT RESUBMITTAL #2 9/6/2022 E2.12 LOWER LEVEL PARTIAL LIGHTING SECTION A PERMIT RESUBMITTAL #2 9/6/2022 E2.21 MIDDLE LEVEL PARTIAL LIGHTING SECTION B PERMIT RESUBMITTAL #2 9/6/2022 E2.22 MIDDLE LEVEL PARTIAL LIGHTING SECTION A PERMIT RESUBMITTAL #2 9/6/2022 E2.31 UPPER LEVEL PARTIAL LIGHTING SECTION B PERMIT RESUBMITTAL #2 9/6/2022 E2.32 UPPER LEVEL PARTIAL LIGHTING SECTION A PERMIT RESUBMITTAL #2 9/6/2022 E3.11 LOWER LEVEL PARTIAL POWER SECTION B PERMIT RESUBMITTAL #2 9/6/2022 E3.12 LOWER LEVEL PARTIAL POWER SECTION A PERMIT RESUBMITTAL #2 9/6/2022 E3.21 MIDDLE LEVEL PARTIAL POWER SECTION B PERMIT RESUBMITTAL #2 9/6/2022 E3.22 MIDDLE LEVEL PARTIAL POWER SECTION A PERMIT RESUBMITTAL #2 9/6/2022 E3.31 UPPER LEVEL PARTIAL POWER SECTION B PERMIT RESUBMITTAL #2 9/6/2022 E3.32 UPPER LEVEL PARTIAL POWER SECTION A PERMIT RESUBMITTAL #2 9/6/2022 E3.41 ROOF LEVEL PARTIAL POWER SECTION B PERMIT RESUBMITTAL #2 9/6/2022 E3.42 ROOF LEVEL PARTIAL POWER SECTION A PERMIT RESUBMITTAL #2 9/6/2022 E5.00 ONE-LINE DIAGRAM PERMIT RESUBMITTAL #2 9/6/2022
E5.01 LIGHTING CONTROL DIAGRAM PERMIT RESUBMITTAL #2 9/6/2022 E5.02 SHORT CIRCUIT ANALYSIS PERMIT RESUBMITTAL #2 9/6/2022 E5.31 PANEL SCHEDULES PERMIT RESUBMITTAL #2 9/6/2022
E5.32 PANEL SCHEDULES PERMIT RESUBMITTAL #2 9/6/2022
E5.33 PANEL SCHEDULES PERMIT RESUBMITTAL #2 9/6/2022
E6.11 ENLARGED KITCHEN POWER-LOWER PERMIT RESUBMITTAL #2 9/6/2022 E6.12 ENLARGED KITCHEN POWER-MIDDLE PERMIT RESUBMITTAL #2 9/6/2022 E6.13 ENLARGED KITCHEN POWER-UPPER PERMIT RESUBMITTAL #2 9/6/2022 E9.01 DETAILS ELECTRICAL PERMIT RESUBMITTAL #2 9/6/2022 E9.02 DETAILS ELECTRICAL PERMIT RESUBMITTAL #2 9/6/2022 E9.03 DETAILS ELECTRICAL PERMIT RESUBMITTAL #2 9/6/2022 E9.04 TYPE LED1 DETAILS PERMIT RESUBMITTAL #2 9/6/2022
E9.05 DETAILS-LOGO PERMIT RESUBMITTAL #2 9/6/2022
E10.0 ELECTRICAL T24-POWER DISTRIBUTION PERMIT RESUBMITTAL #2 9/6/2022 E10.1 ELECTRICAL T24-OUTDOOR LIGHTING PERMIT RESUBMITTAL #2 9/6/2022 E10.2 ELECTRICAL T24-SOLOR READY ZONES PERMIT RESUBMITTAL #2 9/6/2022 K0.0 FOOD SERVICE GENERAL NOTES, LEGENDS, SHEET
INDEX 4/22/2022
K1.0L LOWER LEVEL FOODSERVICE EQUIPMENT PLAN 4/22/2022
K1.0M MIDDLE LEVEL FOODSERVICE EQUIPMENT PLAN 4/22/2022 K1.0U UPPER LEVEL FOODSERVICE EQUIPMENT PLAN 4/22/2022
K2.0L LOWER LEVEL FOODSERVICE ELECTRICAL ROUGH-IN
PLAN 4/22/2022
K2.0M MIDDLE LEVEL FOODSERVICE ELECTRICAL ROUGH-IN
PLAN 4/22/2022
K2.0U UPPER LEVEL FOODSERVICE ELECTRICAL ROUGH-IN
PLAN 4/22/2022
K3.0L LOWER LEVEL FOODSERVICE PLUMBING SUPPLY
ROUGH-IN PLAN 4/22/2022
K3.0M MIDDLE LEVEL FOODSERVICE PLUMBING SUPPLY
ROUGH-IN PLAN 4/22/2022

Page 5 of 10 ends
Page 161 of 259 ends
Page 83 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Document Listing
DRAWING NO. DRAWING TITLE DRAWING SET DRAWING DATE
K3.0U UPPER LEVEL FOODSERVICE PLUMBING SUPPLY ROUGH-
IN PLAN 4/22/2022
K4.0L LOWER LEVEL FOODSERVICE SPECIAL CONDITIONS
PLAN 4/22/2022
K4.0M MIDDLE LEVEL FOODSERVICE SPECIAL CONDITIONS
PLAN 4/22/2022
K4.0R ROOF LEVEL TOP FOODSERVICE SPECIAL CONDITIONS
PLAN 4/22/2022
K4.0U UPPER LEVEL TOP FOODSERVICE SPECIAL CONDITIONS
PLAN 4/22/2022
K4.1 WALK-IN MANUFACTURER SHOP DRAWINGS 4/22/2022
K4.2 WALK-IN MANUFACTURER SHOP DRAWINGS 4/22/2022
K4.3 WALK-IN MANUFACTURER SHOP DRAWINGS 4/22/2022
K5.0 EXHAUST HOOD DETAILS CRITICAL DMENSIONS 4/22/2022
K5.1 HOOD MANUFACTURER SHOP DRAWINGS 4/22/2022
K5.2 HOOD MANUFACTURER SHOP DRAWINGS 4/22/2022
K5.3 HOOD MANUFACTURER SHOP DRAWINGS 4/22/2022
K5.4 HOOD MANUFACTURER SHOP DRAWINGS 4/22/2022
K5.5 HOOD MANUFACTURER SHOP DRAWINGS 4/22/2022
K5.6 HOOD MANUFACTURER SHOP DRAWINGS 4/22/2022
K5.7 HOOD MANUFACTURER SHOP DRAWINGS 4/22/2022
K5.8 HOOD MANUFACTURER SHOP DRAWINGS 4/22/2022
K5.9 HOOD MANUFACTURER SHOP DRAWINGS 4/22/2022
K5.10 HOOD MANUFACTURER SHOP DRAWINGS 4/22/2022
K6.0L LOWER LEVEL FOODSERVICE ELEVATIONS 4/22/2022
K6.0M MIDDLE LEVEL FOODSERVICE ELEVATIONS 4/22/2022
K6.0U UPPER LEVEL FOODSERVICE ELEVATIONS 4/22/2022
K6.1 FOOD SERVICE ELECTRICAL ELEVATIONS 4/22/2022
K6.2 FOOD SERVICE PLUMBING ELEVATIONS 4/22/2022
K8.1 LOWER LEVEL FOODSERVICE PLAN 3/17/2022
K8.2 MIDDLE LEVEL FOODSERVICE PLAN 3/17/2022
K8.3 UPPER LEVEL FOOD SERVICE PLAN 3/17/2022
LV0.0 COVER SHEET REVIEW COMMENTS 9/6/2022
LV1.0 OUTFIELD PLAN REVIEW COMMENTS 9/6/2022
LV1.1a LOWER LEVEL PARTIAL PLAN-A REVIEW COMMENTS 9/6/2022 LV1.1b LOWER LEVEL PARTIAL PLAN-B REVIEW COMMENTS 9/6/2022 LV1.2a LOWER LEVEL PARTIAL RCP-A REVIEW COMMENTS 9/6/2022 LV1.2b LOWER LEVEL PARTIAL RCP-B REVIEW COMMENTS 9/6/2022 LV1.3a MIDDLE LEVEL PARTIAL RCP-A REVIEW COMMENTS 9/6/2022 LV1.3b MIDDLE LEVEL PARTIAL RCP-B REVIEW COMMENTS 9/6/2022 LV1.4a MIDDLE LEVEL PARTIAL RCP-A REVIEW COMMENTS 9/6/2022 LV1.4b MIDDLE LEVEL PARTIAL RCP-B REVIEW COMMENTS 9/6/2022 LV1.5a UPPER LEVEL PARTIAL PLAN-A REVIEW COMMENTS 9/6/2022 LV1.5b UPPER LEVEL PARTIAL PLAN-B REVIEW COMMENTS 9/6/2022 LV1.6a UPPER LEVEL PARTIAL RCP-A REVIEW COMMENTS 9/6/2022 LV1.6b UPPER LEVEL PARTIAL RCP-B REVIEW COMMENTS 9/6/2022 LV1.7a ROOF LEVEL PARTIAL PLAN -A REVIEW COMMENTS 9/6/2022 LV1.7b ROOF LEVEL PARTIAL PLAN -B REVIEW COMMENTS 9/6/2022

Page 6 of 10 ends
Page 162 of 259 ends
Page 84 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Document Listing
DRAWING NO. DRAWING TITLE DRAWING SET DRAWING DATE
LV2.0 INTERIOR DETAILS IT ROOM REVIEW COMMENTS 9/6/2022 LV2.1 INTERIOR DETAILS KITCHEN DISPLAY SYSTEM REVIEW COMMENTS 9/6/2022 LV2.2 INTERIOR DETAILS VIDEO WALL REVIEW COMMENTS 9/6/2022 LV2.3 EXTERIOR DETAILS TARGETS REVIEW COMMENTS 9/6/2022 LV2.4 EXTERIOR DETAILS TEE LINE COLUMNS REVIEW COMMENTS 9/6/2022 LV2.5 EXTERIOR DETAILS TEE LINE REVIEW COMMENTS 9/6/2022 LV2.6 EXTERIOR DETAILS BAY PENDANTS REVIEW COMMENTS 9/6/2022 LV3.0 INTERIOR ELEVATIONS DATA AND POWER REVIEW COMMENTS 9/6/2022 LV3.1 INTERIOR ELEVATIONS DATA AND POWER REVIEW COMMENTS 9/6/2022 LV3.2 INTERIOR ELEVATIONS DATA AND POWER REVIEW COMMENTS 9/6/2022 LV3.3 INTERIOR ELEVATIONS DATA AND POWER REVIEW COMMENTS 9/6/2022 LV3.4 EXTERIOR ELEVATIONS TEE LINE REVIEW COMMENTS 9/6/2022 LV3.5 EXTERIOR ELEVATIONS TEE LINE REVIEW COMMENTS 9/6/2022 LV3.6 EXTERIOR ELEVATIONS CAMERA INFASTRUCTURE REVIEW COMMENTS 9/6/2022 LV3.7 EXTERIOR ELEVATIONS CAMERA INFASTRUCTURE REVIEW COMMENTS 9/6/2022 LV3.8 INTERIOR ELEVATIONS BLOCKING DETAILS REVIEW COMMENTS 9/6/2022 LV3.9 INTERIOR ELEVATIONS MOUNT DETAILS REVIEW COMMENTS 9/6/2022 LV4.0 SCHEDULES OUTFIELD, LOWER LEVEL REVIEW COMMENTS 9/6/2022 LV4.1 SCHEDULES MIDDLE, UPPER LEVELS REVIEW COMMENTS 9/6/2022 LV4.2 SCHEDULES UPPER, UPPER LEVELS REVIEW COMMENTS 9/6/2022 MEP0.1 COVER SHEET - SYMBOLS CITY COMMENTS 9/6/2022
MEP0.2 COVER SHEET - GENERAL NOTES CITY COMMENTS 9/6/2022 M1.1A PARTIAL LOWER LEVEL MECHANICAL PLAN CITY COMMENTS 9/6/2022 M1.1B PARTIAL LOWER LEVEL MECHANICAL PLAN CITY COMMENTS 9/6/2022 M1.2A PARTIAL MIDDLE LEVEL MECHANICAL PLAN CITY COMMENTS 9/6/2022 M1.2B PARTIAL MIDDLE LEVEL MECHANICAL PLAN CITY COMMENTS 9/6/2022 M1.3A PARTIAL UPPER LEVEL MECHANICAL PLAN CITY COMMENTS 9/6/2022 M1.3B PARTIAL UPPER LEVEL MECHANICAL PLAN CITY COMMENTS 9/6/2022 M1.4A PARTIAL ROOF LEVEL MECHANICAL PLAN CITY COMMENTS 9/6/2022 M1.6 ENLARGED MIDDLE LEVEL MECHANICAL KITCHEN PLAN CI TY COMMENTS 9/6/2022 M3.1 MECHINCAL EQUIPMENT SCHEDULES CITY COMMENTS 9/6/2022 M3.2 MECHINCAL LOAD SCHEDULE CITY COMMENTS 9/6/2022
M4.1 MECHINCAL DETAILS CITY COMMENTS 9/6/2022
M4.2 MECHINCAL DETAILS CITY COMMENTS 9/6/2022
M4.3 MECHINCAL DETAILS CITY COMMENTS 9/6/2022
M4.4 MECHINCAL DETAILS CITY COMMENTS 9/6/2022
M5.1 KITCHEN HOOD EQUIPMENT CITY COMMENTS 9/6/2022
M5.2 KITCHEN HOOD EQUIPMENT CITY COMMENTS 9/6/2022
M5.3 KITCHEN HOOD EQUIPMENT CITY COMMENTS 9/6/2022
M5.4 KITCHEN HOOD EQUIPMENT CITY COMMENTS 9/6/2022
M5.5 KITCHEN HOOD EQUIPMENT CITY COMMENTS 9/6/2022
M5.6 KITCHEN HOOD EQUIPMENT CITY COMMENTS 9/6/2022
M5.7 KITCHEN HOOD EQUIPMENT CITY COMMENTS 9/6/2022
M5.8 KITCHEN HOOD EQUIPMENT CITY COMMENTS 9/6/2022

Page 7 of 10 ends
Page 163 of 259 ends
Page 85 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Document Listing
DRAWING NO. DRAWING TITLE DRAWING SET DRAWING DATE
M5.9 KITCHEN HOOD EQUIPMENT CITY COMMENTS 9/6/2022
M6.1 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.2 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.3 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.4 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.5 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.6 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.7 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.8 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.9 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.10 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.11 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.12 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.13 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.14 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.15 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.16 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.17 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
M6.18 KITCHEN HOOD DRAWING CITY COMMENTS 9/6/2022
P1.0a UNDERGROUND PLUMBING PLAN CITY COMMENTS 9/6/2022
P1.0b UNDERGROUND PLUMBING PLAN CITY COMMENTS 9/6/2022
P1.1a LOWER LEVEL PLUMBING PLAN CITY COMMENTS 9/6/2022
P1.1b LOWER LEVEL PLUMBING PLAN CITY COMMENTS 9/6/2022
P1.2a MIDDLE LEVEL PLUMBING PLAN CITY COMMENTS 9/6/2022 P1.2b MIDDLE LEVEL PLUMBING PLAN CITY COMMENTS 9/6/2022 P1.3a UPPER LEVEL PLUMBING PLAN CITY COMMENTS 9/6/2022
P1.3b UPPER LEVEL PLUMBING PLAN CITY COMMENTS 9/6/2022
P1.4a ROOF LEVEL PLUMBING PLAN CITY COMMENTS 9/6/2022
P1.4b ROOF LEVEL PLUMBING PLAN CITY COMMENTS 9/6/2022
P2.0 PLUMBING NOTES CITY COMMENTS 9/6/2022
P2.1 ENLARGED PLUMBING PLANS CITY COMMENTS 9/6/2022
P2.2 ENLARGED PLUMBING PLANS CITY COMMENTS 9/6/2022
P2.3 ENLARGED PLUMBING PLANS CITY COMMENTS 9/6/2022
P2.4 ENLARGED PLUMBING PLANS CITY COMMENTS 9/6/2022
P3.1A PARTIAL LOWER LEVEL GAS PIPING PLAN CITY COMMENTS 9/6/2022 P3.1B PARTIAL LOWER LEVEL GAS PIPING PLAN CITY COMMENTS 9/6/2022 P3.2A PARTIAL MIDDLE LEVEL GAS PIPING PLAN CITY COMMENTS 9/6/2022 P3.2B PARTIAL MIDDLE LEVEL GAS PIPING PLAN CITY COMMENTS 9/6/2022 P3.3A PARTIAL UPPER LEVEL GAS PIPING PLAN CITY COMMENTS 9/6/2022 P3.3B PARTIAL UPPER LEVEL GAS PIPING PLAN CITY COMMENTS 9/6/2022 P4.1 PLUMBING DETAILS CITY COMMENTS 9/6/2022
P4.2 PLUMBING DETAILS CITY COMMENTS 9/6/2022
P5.1 PLUMBING SCHEDULE CITY COMMENTS 9/6/2022
P5.2 PLUMBING SCHEDULE CITY COMMENTS 9/6/2022
P6.1 PLUMBING DIAGRAMS CITY COMMENTS 9/6/2022
P6.2 PLUMBING DIAGRAMS CITY COMMENTS 9/6/2022

Page 8 of 10 ends
Page 164 of 259 ends
Page 86 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Document Listing
DRAWING NO. DRAWING TITLE DRAWING SET DRAWING DATE
P6.3 GAS PIPING RISER DIAGRAM FIRST FLOOR CITY COMMENTS 9/6/2022 P6.4 GAS PIPING RISER DIAGRAM SECOND FLOOR CITY COMMENTS 9/6/2022 P6.5 GAS PIPING RISER DIAGRAM THIRD FLOOR CITY COMMENTS 9/6/2022 P6.6 PLUMBING DIAGRAMS CITY COMMENTS 9/6/2022
S0.1 NOTES PERMIT RESUBMITTAL 9/6/2022
S0.2 NOTES PERMIT RESUBMITTAL 9/6/2022
S0.3 NOTES PERMIT RESUBMITTAL 9/6/2022
S1.1A FOUNDATION PLAN - AREA A PERMIT RESUBMITTAL 9/6/2022 S1.1B FOUNDATION PLAN - AREA B PERMIT RESUBMITTAL 9/6/2022 S1.2A MIDDLE LEVEL PLAN - AREA A PERMIT RESUBMITTAL 9/6/2022 S1.2B MIDDLE LEVEL PLAN - AREA B PERMIT RESUBMITTAL 9/6/2022 S1.3A UPPER LEVEL PLAN - AREA A PERMIT RESUBMITTAL 9/6/2022 S1.3B UPPER LEVEL PLAN - AREA B PERMIT RESUBMITTAL 9/6/2022 S1.4A ROOF PLAN - AREA A PERMIT RESUBMITTAL 9/6/2022
S1.4B ROOF PLAN - AREA B PERMIT RESUBMITTAL 9/6/2022
S1.5 CONCRETE SLAB SAWCUTS PERMIT RESUBMITTAL 9/6/2022 S1.6 SD ISOMETRIC PERMIT RESUBMITTAL 9/6/2022
S2.0 ELEVATIONS PERMIT RESUBMITTAL 9/6/2022
S2.1 ELEVATIONS PERMIT RESUBMITTAL 9/6/2022
S2.2 ELEVATIONS PERMIT RESUBMITTAL 9/6/2022
S2.3 SECTIONS PERMIT RESUBMITTAL 9/6/2022
S2.4 SECTIONS PERMIT RESUBMITTAL 9/6/2022
S2.5 SECTIONS PERMIT RESUBMITTAL 9/6/2022
S2.6 SECTIONS PERMIT RESUBMITTAL 9/6/2022
S3.0 TYPICAL CONCRETE DETAILS PERMIT RESUBMITTAL 9/6/2022 S3.1 TYPICAL SOG DETAILS PERMIT RESUBMITTAL 9/6/2022
S3.2 TYPICAL TIE BEAM DETAILS PERMIT RESUBMITTAL 9/6/2022 S3.3 TYPICAL TIE BEAM DETAILS PERMIT RESUBMITTAL 9/6/2022 S5.0 TYP. STEEL DETAILS PERMIT RESUBMITTAL 9/6/2022
S5.1 TYP. STEEL BEAM CONNS PERMIT RESUBMITTAL 9/6/2022 S5.2 STEEL DETAILS PERMIT RESUBMITTAL 9/6/2022
S5.3 TYP. METAL DECK DETAILS PERMIT RESUBMITTAL 9/6/2022 S5.4 TYP. METAL DECK DETAILS PERMIT RESUBMITTAL 9/6/2022 S5.5 TYP. METAL DECK DETAILS PERMIT RESUBMITTAL 9/6/2022 S5.6 TYP. EXT WALL - STEEL PERMIT RESUBMITTAL 9/6/2022 S5.7 STAIR DETAILS PERMIT RESUBMITTAL 9/6/2022
S5.8 STAIR 4 FRAMING PLANS PERMIT RESUBMITTAL 9/6/2022 S5.9 FRAME ELEVATIONS PERMIT RESUBMITTAL 9/6/2022
S5.10 YIELD LINK DETAILS PERMIT RESUBMITTAL 9/6/2022
L0.0 TITLE SHEET - 1st CITY SUBMITTAL SET ISSUED IN ADDENDUM #3 10/4/2022 L1.0 IRRIGATION PLAN ISSUED IN ADDENDUM #3 10/4/2022
L1.1 IRRIGATION PLAN ISSUED IN ADDENDUM #3 10/4/2022
L1.2 RECYCLED WATER NOTES ISSUED IN ADDENDUM #3 10/4/2022 L2.0 PLANTING PLAN ISSUED IN ADDENDUM #3 10/4/2022
L2.1 PLANTING PLAN ISSUED IN ADDENDUM #3 10/4/2022
L2.2 PLANTING SCHEDULE ISSUED IN ADDENDUM #3 10/4/2022

Page 9 of 10 ends
Page 165 of 259 ends
Page 87 ends

Topgolf Montebello Guaranteed Maximum Price Proposal
McCarthy Building Companies
Document Listing
DRAWING NO. DRAWING TITLE DRAWING SET DRAWING DATE
L3.0 LANDSCAPE INSTALLATION DETAILS ISSUED IN ADDENDUM #3 10/4/2022 L4.0 LANDSCAPE SPECIFICATIONS ISSUED IN ADDENDUM #3 10/4/2022 L4.1 LANDSCAPE SPECIFICATIONS ISSUED IN ADDENDUM #3 10/4/2022 L4.2 LANDSCAPE SPECIFICATIONS ISSUED IN ADDENDUM #3 10/4/2022 Geotech Report Leighton Geotechnical ExploratoinReport March 29, 2022 3/29/2022 Exhibit L.1 Topgolf Montebello Responsibility Matrix 10/26/2022 10/26/2022 RFI Log Answered PRE-BID RFI Log 10/27/2022 10/27/2022

Page 10 of 10 ends