D-2

ARTICLE V
CONTRACTOR acknowledges the provisions of the State Labor Code requiring every employer to be insured against liability for worker’s compensation, or to undertake self -insurance in accordance with the provisions of that code, and certifies compliance with such provisions.

ARTICLE VI
CONTRACTOR agrees to indemnify, defend and hold harmless AGENCY and all of its officers and agents from any claims, demand, or causes of action, including related expenses, attorney’s fees, and costs, based on, arising out of, or in any way related to the work undertaken by CONTRACTOR hereunder

ARTICLE VII
CONTRACTOR affirms that the signatures, titles, and seals set forth hereinafter in execution of this Contract Agreement represent all individuals, firm members, partners, joint venturers, and/or corporate officers having principal interest herein.

ARTICLE VIII
CONTRACTOR shall take and assume all responsibility for the work. CONTRACTOR shall bear all losses and damages directly or indirectly resulting to him, to the City, or to others on account of the performance under this contract, or the character of the work, accidents or any other causes whatsoever.

CONTRACTOR shall assume the defense and indemnify and save harmless the City, its officers, employees and Engineer from all claims, loss, damage, injury and liability of every kind, nature and description, directly or indirectly arising from performance of this contract or work, regardless of responsibility for negligence; from any and all claims, loss, damage, injury, and liability, howsoever the same may be caused, resulting directly or indirectly from the nature of the work covered by this contract, or CONTRACTOR’s performance thereunder, regardless of responsibility for negligence.

ARTICLE IX

STATE LABOR CODE. Contractor agrees to abide by the provisions of the State Labor Code, and to comply with the prevailing rates of wages and apprenticeship employment standards established by the State Director of Industrial Relations and /or the requirements of the federal government and applicable federal wage rates.

The total contract price of this agreement is $ based on estimated quantities given on the Base Bid Sheet.

ARTICLE X
The contract period for this project is ninety (90) working days, for construction to begin from the effective date of the Notice-to-Proceed issued by the City.

Page 444 of 751 ends

D-3

ARTICLE XI (PREVAILING WAGES)

(a) Contractor agrees to comply with the provisions of California Labor Code Section 1773.8, which requires the payment of travel and subsistence payments to each worker needed to execute the work to the extent required by law.

(b) Contractor agrees to comply with the provisions of California Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Contractor shall, as a penalty to the Agency, forfeit no more than fifty dollars ($50) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the Director of Industrial Relations for the work or craft in which the worker is employed for any public work done under the contract by Contractor or by a subcontractor.

(c) Contractor agrees to comply with the provisions of California Labor Code Section 1776 which requires Contractor and each subcontractor to (i) keep accurate payroll records, (ii) certify and make such payroll records available for inspection as provided by Section 1776, and (iii) inform the Agency of the location of the records. The Contractor is responsible for compliance with Section 1776 by itself and all of its subcontractors.

(d) Contractor agrees to comply with the provisions of California Labor Code Section 1777.5 concerning the employment of apprentices on public works projects, and further agrees that the Contractor is responsible for compliance with Section 1777.5 by itself and all of its subcontractors.
(e) Contractor agrees to comply with the provisions of California Labor Code Section 1813 concerning penalties for workers who work excess hours without approval of the City. The Contractor shall, as a penalty to the Agency, forfeit twenty -five dollar ($25) for each worker employed in the execution of the contract by the Contractor or by any subcontractor for each calendar day or portion thereof during which such worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Division, 2, Part 7, Chapter 1, Article 3 of the California Labor Code. The Contractor may, with the approval of the Public Works Director, use his employees to carry out work on the project beyond the normal eight (8) hour workday and on Saturdays, Sundays and Holidays provided the employees are paid at the following hourly rates:

For Daytime Work
• Weekdays (Monday through Fridays) after eight (8) hours daily and not to exceed twelve (12) hours daily total per day and not exceeding forty-eight (48) hours work in a seven (7) day period week at one and one -half (1.5) times the prevailing hourly wage for the initial eight (8) hours of regular work time for the time worked after the initial eight (8) hours regular time.

• Saturdays, Sundays and Holidays for time worked after forty (40) hours of regular work time in a seven (7) day period week at the rate of two (2.0) times the prevailing hourly wage for the initial eight (8) hours of regular weekday work time and not to exceed a total of forty-eight (48) hours of work within the seven (7) day work week period.

Page 445 of 751 ends

D-4
(f) California Labor Code Sections 1860 and 3700 provide that every contractor will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, Contractor hereby certifies as follows:

“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker’s compensation or under self -insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this contract.” Liquidated Damages: The liquidated damages value is hereby amended to be $500.00 per day.

ARTICLE XII (PROMPT PAYMENT)
Prompt Progress Payment to Subcontractors
Attention is directed to Section 7108.5 of the California Business and Professions Code, which requires a prime contractor or subcontractor to pay any subcontractor not later than 10 days of receipt of each progress payment, unless otherwise agreed to in w riting. In addition, Federal Regulation (49 CFR 26.29) requires a prime contractor or subcontractor to pay a subcontractor no later than 30 days of receipt of each payment, unless any delay or postponement of payment among the parties takes place only for good cause and with the prior written approval of the agency.

Section 7108.5 of the California Business and Professions Code also contains enforcement actions and penalties.

IN WITNESS WHEREOF the parties hereto for themselves, their heirs, executors, administrators, successors, and assigns do hereby agree to the full performance of the covenants herein contained and have caused this Contract Agreement to be executed in triplicate by setting hereunto their names, titles, hands, and seals this day of , 20 .

CONTRACTOR:

(Title)
Contractor’s License No.

AGENCY Business License No.

Federal Tax Identification No.:

Subscribed and sworn to this day of , 20 .

NOTARY PUBLIC

AGENCY:

Raul Alvarez, City Manager of the City of Montebello

ATTESTED:

Christopher Jimenez, City Clerk of the City of Montebello

Date

Page 446 of 751 ends

D-5

FAITHFUL PERFORMANCE BOND
FOR
FY 2025-2026 SB1 RUBBERIZED ASPHALT STREET ENHANCEMENT PROJECT

C.P. No. 944

IN THE CITY OF MONTEBELLO

KNOW ALL MEN BY THESE PRESENTS that
as CONTRACTOR and
, as SURETY, are held and
firmly bound unto the City of Montebello, as AGENCY, in the penal sum of

dollars
($ ), which is one -hundred percent (100%) of the total contract amount for the above stated project, for the payment of which sum, CONTRACTOR and SURETY agree to be bound, jointly and severally, firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas CONTRACTOR has been awarded and is about to enter into the annexed Contract Agreement with AGENCY for the above stated project, if CONTRACTOR faithfully performs and fulfills all obligations under the contract documents in the manner and time specified therein, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY; provided that any alterations in the obligations or time for completion made pursuant to the terms of the contract documents shall not in any way release either CONTRACTOR or SURETY, and notice of such alterations is hereby waived by SURETY.

IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this day of , 20 .

CONTRACTOR*

SURETY*

Subscribed and sworn to this day of , 20 .

NOTARY PUBLIC
* Provide CONTRACTOR/SURETY name, address and telephone number and the name, title, address and telephone number of authorized representative.

Page 447 of 751 ends

D-6

MATERIAL AND LABOR BOND
FOR
FY 2025-2026 SB1 RUBBERIZED ASPHALT STREET ENHANCEMENT PROJECT C.P. No. 944

IN THE CITY OF MONTEBELLO
KNOW ALL MEN BY THESE PRESENTS that
, as CONTRACTOR,
and , as SURETY, are
held and firmly bound unto the City of Montebello, as AGENCY , in the penal sum of

dollars
($ ), which is fifty percent (50%) of the total contract amount for the above stated project, for payment of which sum, CONTRACTOR and SURETY agree to be bound, jointly and severally, firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas CONTRACTOR has been awarded and is about to enter into the annexed Contract Agreement with AGENCY for the above stated project, if CONTRACTOR or any subcontractor fails to pay for any labor or material of any kind used in the performance of the work to be done under said contract, or fails to submit amounts due under the State Unemployment Insurance Act with respect to said labor, SURETY will pay for the same in an amount not exceeding the sum set forth above, which amount shall inure to the benefit of all persons entitled to file claims under the State Code of Civil Procedures; provided that any alteration made pursuant to the terms of the contract documents shall not in any way release either CONTRACTOR or SURETY, and notice of said alterations is hereby waived by SURETY.

IN WITNESS WHEREOF the parties have set their names, titles, hands, and seals this day of , 20 .

CONTRACTOR*

SURETY*

Subscribed and sworn to this day of , 20 .

NOTARY PUBLIC
* Provide CONTRACTOR/SURETY name, address and telephone number and the name, title, address and telephone number of authorized representative.

Page 448 of 751 ends

GP-1

SPECIAL PROVISIONS
PART 1 – GENERAL PROVISIONS

FOR

FY 2025-2026 SB1 RUBBERIZED ASPHALT STREET ENHANCEMENT PROJECT

C.P. No. 944

IN THE CITY OF MONTEBELLO
Except as otherwise provided in the Plans, Special Provisions, Special Specifications, or as modified herein, the work embraced herein shall be done in accordance with the appropriate provisions of the Standard Specifications for Public Works Construction, “Green Book”, 2018 Edition, which are hereinafter referred to as the Standard Specifications.

The intention of the contract documents is to include all plant labor, services, materials, tools, equipment, supplies, transportation, utilities, and all other items and facilities necessary therefore, as provided in the contract documents for the proper execution and completion of the work on the project in strict accordance with the plans and specifications.

The Standard Specifications and Standard Plans of the AGENCY are contained in the 2018 Edition, and applicable amendments to, of the Standard Specifications for Public Works Construction (SSPWC) and Standard Plans for Public Works Construction (SPPWC). Copies of these Standard Specifications and Plans are available from the publisher, Building News, Incorporated, 1612 South Clementine Street, Anaheim, CA 92802, telephone (714) 517-0970.

The AGENCY also uses the Standard Specifications and plans of the State of California Department of Transportation (Caltrans) which Standard Specifications and Plans are available from Caltrans District 7, Los Angeles or Caltrans Office in Sacramento.

The Standard Specifications set forth above will control the general provisions, construction materials, and construction methods for this contract except as amended by the Plans, Special Provisions, or other contract documents. The following Special Provisions are supplementary and in addition to the provisions of the Standard Specifications unless otherwise noted and the section numbers of the Special Provisions coincide with those of the said Standard Specifications. Only those sections requiring elaboration, amendment, specifying of options, or additions are called out.

Page 449 of 751 ends

GP-1
PART 1 – GENERAL PROVISIONS

SECTION 1 – GENERAL

1-2 TERMS AND DEFINITIONS.

In addition to the terms and definitions of subsection 1-2, whenever in the contract documents the following terms are used, they shall be understood to mean and refer to the following:

ALLOWABLE COSTS means those costs not covered by agreed unit prices, which are to be used in calculating adjustments to the Contract Sum.

ALLOWABLE MARKUPS means the percentage of markups for Work not covered by agree unit prices, which are to be used in calculating adjustments to the Contract Sum.

APPLICABLE LAWS means all applicable federal, state and municipal laws (legal and equitable), statutes, building codes, ordinances, regulations and lawful orders (including, without limitation, the City acting in its regulatory capacity) having jurisdiction over the Project, Work, Site, City, or Contractor (including, without limitation, Environmental Laws) and all ordinances, rules and regulations enacted by City. In the event of a conflict between or among Applicable Laws governing Contractor’s performance of the Work, the more stringent shall apply.

APPLICATION FOR PAYMENT means Contractor’s certified application for payment for Work in accordance with the Contract Documents.

ARCHITECT means the individual or firm under contract with City primarily responsible to provide design, engineering and related construction administration for the Project.

AGENCY: City of Montebello

BOARD: City Council of the City of Montebello

COUNTY: County of Los Angeles

FEDERAL: United States of America

BIDDING DOCUMENTS means the following collection of documents prepared and issued for the purpose of soliciting Bids for the Work: (1) Invitation to Submit Bids, (2) Instructions to Bidders, (3) Bid Forms, (4) Construction Contract, (5) Special Provisions, (6) Drawings and Schedules, (7) Details, (8) Addenda(s), and (9) those documents, or those portions or provisions of documents that, although not listed among the documents described in Clauses (1) through (8) hereinabove, are expressly cross-referenced therein or attached thereto.

CERTIFICATE FOR PAYMENT means the statement from the Engineer certifying both the undisputed amount of money due to Contractor and the amount of money, if any, that are disputed upon an Application for Payment.

CHANGE means a modification, change, addition, substitution or deletion in the Work or in Contractor’s means, methods, manner, time or sequence of performing the Work arising from any

Page 450 of 751 ends

GP-1
cause or circumstances, including, without limitation, either directly at the request of City or constructively by reason of other circumstances. Use of the term “Change,” in any context, in the Contract Documents shall not be interpreted as implying that Contractor is entitled to an adjustment increasing the Contract Sum or extending the Contract Time on any basis other than for Compensable Change or Compensable Delay.

CHANGE ORDER means a written instrument, signed by City and Contractor in accordance with the requirements of the General Conditions, designating any work that is a change of scope requiring additional expenditure of materials and labor and/or requiring additional time to complete. Its purpose is to establish the terms of City and Contractor’s mutual agreement to an adjustment of the Contract Sum or Contract Time on account of Compensable Change, Deleted Work, Compensable Delay or Excusable Delay.

CHANGE ORDER REQUEST means Contractor’s written request for an adjustment in the Contract Sum and/or Contract Time due to a Compensable Change, Compensable Delay or Deleted Work.

CITY means the City of Montebello, a municipal corporation organized under the laws of the State of California, acting through the City Council or other representatives duly authorized by the City Council to act on City’s behalf.

CITY CONSULTANT means the designated Consultant, other than the Architect, engaged by City (or engaged as a subconsultant to the Architect or Consultant) to provide professional advice with respect to the design, construction or management of the Project.

CITY COUNCIL means the City Council of the City of Montebello.

CLAIM means a written demand or assertion by City or Contractor seeking, as a matter of right, an interpretation of contract, payment of money, recovery of damages or other relief. A CLAIM does not include the following: (1) a tort claims for personal injury or death, (2) stop notice claims, (3) the right of City to specific performance or injunctive relief to compel performance, or (4) any rights remedies, administrative action, and/or penalties that the City has under applicable law.

CLOSE-OUT DOCUMENTS means the warranties, guarantees, maintenance and operations manuals that, along with electronic versions, are required to be delivered by Contractor to the City upon Final Completion of the Project Work.

COMPENSABLE CHANGE means Extra Work: (1) that is the result of (a) Differing Site Conditions, or (b) revisions in Applicable Laws enacted after the execution of the Construction Contract by City and Contractor, (c) a Change requested in a writing signed by the Engineer, or (d) other circumstances involving a Change in the Work or which Contractor is given under the C
ontract Documents a specific and express right to adjustment of the Contract sum; and (2) that is not caused, in whole or part, by the negligence or willful misconduct of Contractor or a Subcontractor of any Tier or a failure to comply with Contractor’s obligations under the Contract Documents; and (3) for which an adjustment to the Contract Sum is not prohibited by nor waived under the terms of the Contract Documents; and (4) that if performed would require Contractor to incur additional and unforeseeable Allowable Costs that would not have been required to be incurred in the absence of such Extra Work.

Page 451 of 751 ends

GP-1
COMPENSABLE DELAY means a Delay to the critical path of activities affecting Contractor’s ability to achieve Final Completion of the Project Work within the Contract Time, not caused, in whole or in part, by the negligence or willful misconduct of Contractor or a Subcontractor or any Tier or a failure to comply with Contractor’s obligations under the Contract Documents, and that is caused solely by any of the following: (1) a Compensable Change, (2) the active negligence of City, Engineer, Architect, City Consultant or a Separate Contractor, or (3) other circumstances involving Delay for which Contractor is given under the Contract Documents a specific and express right to both an adjustment of the Contract Sum and/or Contract Time.

COMPLETION PUNCH LIST means the list of items of Work to be completed or corrected by Contractor for Final Completion of the Project Work.

CONSEQUENTIAL DAMAGES means damages incurred by either City or Contractor for loss of use, loss of profit or income, loss of revenue, lost opportunity, additional or unabsorbed overhead, loss of management or services, loss of productivity, loss of financing or funding, loss of business reputation, loss of bonding and all similar indirect, economic damages that are caused as a result of either Delay or that result from a termination or suspension (for default or convenience) of all or any portion of the Construction Contract or the Work. Consequential Damages do not include direct or indirect damage or injury to persons or tangible property, including without limitation, the repair or replacement of tangible property damaged or lost.

CONSTRUCTION CONTRACT means the written contract contained in the Bidding Documents and executed between City and Contractor for the Work.

CONTRACT DOCUMENTS means the following collection of documents governing Contractor’s performance of the Work: (1) the Bidding Documents, (2) the Construction Contract between City and Contractor, other terms, conditions and requirements applicable to the performance of the Construction Contract and Work (including General Provisions, any supplemental and Special Provisions and the General Requirements), Drawings, Specifications, Addenda issued prior to execution of the Construction Contract and other documents listed in the Construction Contract and Modifications issued after execution of the Construction Contract, (3) a Change Order signed by both City and Contractor and/or such others, if any, as required by the General Conditions, (4) a Unilateral Change Order signed by City and/or others, if any, as required by the General Conditions, (5) a Field Order signed by City and/or others, if any, as required by the General Conditions, (6) a written order for a Minor Change in the Work issued by the Engineer, and (7) the Declaration of Sufficiency of Funds completed and signed by Contractor.

CONTRACT SUM means the total amount of compensation stated in the Construction Contract, including adjustments authorized by Change Orders or Unilateral Change Orders, that is payable to Contractor for the performance of the Work in accordance with the Contract Documents.

CONTRACT TIME means the total number of working days set forth in the Construction Contract within which Contractor is obligated to submit Materials Confirmations and achieve Completion and Final Completion of the Project Work and/or Project Work, as adjusted for extensions of time permitted under the terms of the Contract Documents and approved by City.

CONTRACTOR means the person or entity under contract with City pursuant to the Construction Contract to serve as the general contractor for construction of the Work.

Page 452 of 751 ends

GP-1
DAY, whether capitalized or not, and unless otherwise specifically provided, means Monday, Tuesday, Wednesday, Thursday, Friday, and does not include weekends or City recognized legal holidays.

DEFECTIVE WORK means Work by Contractor or a Subcontractor that is unsatisfactory, faulty, omitted, incomplete, deficient or does not conform to Applicable laws, the Contract Documents or the requirements of any inspection, reference standard, test, code or approval specified in the Contract Documents.

DELAY, whether capitalized or not, means any circumstances involving delay, disruption, hindrance or interference in the performance of the Work.

DELETED WORK means work that is eliminated due to a Change requested by City.

DESIGN DOCUMENTS means all plans, drawings, tracings, specifications, programs, reports, calculations, models, presentation materials and other materials or documents containing designs, specifications or engineering information prepared by the Architect, City Consultants, Contractor, Separate Contractors or Subcontractors including, without limitation, computer aided design materials, electronic data files and paper copies. The term “Design Documents” includes, without limitation, all building and other designs depicted therein, as well as the written documents themselves.

DIFFERING SITE CONDITION means an unforeseen condition at a Site or in Existing improvements at a Site. Specifically they are those conditions, located at a Site or in Existing Improvements, not otherwise ascertainable by Contractor through the exercise of thorough care and diligence in its inspection of the Sites and Bidding Documents, that constitute: (1) hazardous materials that constitute hazardous waste, as defined in California Health and Safety Code Section 25117, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of Applicable Laws; or (2) subsurface or concealed conditions at the Sites or concealed conditions in Existing Improvements which differ materially from those indicated by the Contract Documents or other information available to Contractor prior to submission of the Bid; or (3) unknown physical conditions at the Sites or concealed conditions in Existing improvements of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the Work of the character provided for in the Contract Documents.

DISCOVERY DATE, used in reference to Contractor’s obligation to give written notice of certain facts, conditions or circumstances, means the earlier of the dates the Contractor either: (1) discovered such facts, conditions or circumstances, or (2) should have discovered such facts, conditions or circumstances in the exercise of reasonable care practiced by the general contractors performing public works construction projects in the Southern California area.

DRAWINGS means the graphic and pictorial portions of the Contract Documents prepared by the Architect or a City Consultant showing the design, location and dimensions of the Work, including plans, elevations, details, schedules and diagrams. The term “Drawings” is used interchangeably with “Plans.”

Page 453 of 751 ends

GP-1
ENGINEER means the City Engineer or the Public Works Director for City of Montebello acting either directly or through properly authorized agents, acting within the scope of the particular duties entrusted to them.

EXCUSABLE DELAY means a Delay, other than a Compensable Delay, to Contractor’s ability to perform within the Contract Time that is (1) not caused, in whole or in part, by the negligence or willful misconduct of Contractor or a Subcontractor of any Tier or a failure to comply with the obligations of Contractor under the Contract Documents; and (2) is unforeseeable, unavoidable and beyond the control of Contractor and the Subcontractor, of any Tier; and (3) the result of a Force Majeure Event. Without limitation to the foregoing, neither the bankruptcy, insolvency nor financial inability of Contractor or any Subcontractor, nor any failure by a Subcontractor to perform any obligation imposed by contract or Applicable Laws, shall constitute grounds for Excusable Delay.

EXTRA WORK means Work (other than Work that is either a logical evolution of the Consultant’s detailing, refinement and clarification of the Drawings and Specifications that are part of the Contract Documents or that is reasonably inferable as necessary to satisfy the design intent for a completed and fully operational system, facility or structure) that is not indicated by the Contract Documents, the performance of which requires the expenditure by Contractor of additional and unforeseen Allowable Costs. Reference to Extra Work shall not be interpreted to mean or imply that Contractor is entitled to an adjustment to the Contract Sum or Contract Time unless such Extra Work constitutes a Compensable Change.

FIELD ORDER means a written directive signed by the City and Contractor that: (1) directs the performance of a Minor Change, (2) directs performance of Work or a Change with respect to which there exists a dispute or question regarding adjustment of the Co ntract Sum or Contract Time, or (3) establishes a mutually agreed basis for compensation to Contractor for a Compensable Change or Deleted Work under circumstances where performance needs to proceed in advance of the Contractor having completed its substantiation and evaluation of the impact thereof on the Contract Sum or Contract Time.

FINAL COMPLETION, FINALLY COMPLETE means (1) with respect to Project Work, the point at which the following conditions have occurred with respect to such Work: (a) the entirety of such Work is fully completed, including all minor corrective, or “punch list ,” items, (b) a permanent and unconditional waiver for the entirety of such Work has been delivered to City, (c) all documents required to be submitted, including without limitation, warranties, guaranties and other Close -Out Documents, (d) such Work and t he related portions of the Site have been thoroughly cleared of all construction debris and cleaned in accordance with the requirements of the Contract Documents, including, but not necessarily limited to where applicable, the following:
removal of temporary protections; removal of marks, stains, fingerprints and other soil and dirt from painted, decorated and natural -finished woodwork; removal of spots, plaster, soil and paint from ceramic tile, marble and other finished materials; all surfaces, fixtures, cabinet work and equipment are wiped in accordance with recommendations of the manufacturer; and all stone, tile and resilient floors are cleaned thoroughly in accordance with manufactures recommendations and buff dried by machine to bring the surfaces to sheen, and (d) all conditions set forth in the Contract Documents for completion of such Work have been, and continue to be, fully satisfied; and (2) with respect to the Project Work, the point at which: (a) all of the conditions set forth in Clause (1) of t
he Paragraph have occurred for each and every Home comprising the Project; and (b) all

Page 454 of 751 ends

GP-1
contractors and subcontractors have been paid and there are no outstanding stop orders claims or claims of any kind that may delay the payment by the City of its ten-percent self-retention monies.

FORCE MAJEURE EVENT means, and is restricted to, any of the following: (1) Acts of God, (2) terrorism or other acts of public enemy, (3) acts or omissions of Governmental Authorities beyond the reasonable foreseeability and control of Contractor, (4) epidemics or quarantine restrictions, (5) strikes, other than those resulting from a violation by Contractor or a Subcontractor of Applicable Laws or applicable collective bargaining agreements, resulting in the unavailability of workers or replacement workers, (6) acts or omissions of the Homeowner that Delay access to a Home or performance of the Work, or (7) unusual shortages in materials that are supported by documented proof that (a) Contractor made every effort to obtain such materials from all available sources located within a reasonable distance of the Site where those materials are to be used in performing the Work, (b) such shortage is due to the fact that such materials are not physically available or could not have been obtained only at exorbitant prices entirely inconsistent with current rates taking into account the quantities involved and the usual industry practices in obtaining such quantities, and (c) such shortages and the difficulties in obtaining alternate sources of materials could not have been known or anticipated at the timed the Construction Contract was entered into.

GENERAL CONDITIONS means the herein set forth general terms and conditions.

HAZARDOUS SUBSTANCE means: (1) any chemical, material or other substance defined as or included within the definition of “hazardous substances,” “hazardous wastes”, “extremely hazardous substances,” “toxic substances”, “toxic material”, “restricted hazardous waste”, “special waste”, “contamination”, or words of similar import under any Environmental Law, including without limitation, the following: petroleum (including crude oil or any fraction thereof), asbestos, asbestos-containing materials, polychlorinated biphenyls (“PCB:”) and PCB-containing materials, whether or not occurring naturally; (2) lead paint, or (3) any substance that because of its quantity, concentration or physical or chemical characteristics poses a significant present or potential hazard to human health and safety or to the environment, and which has been determined by any Governmental Authority to be a hazardous waste or hazardous substance.

INSPECTOR OF RECORD means the Inspector responsible, among others, for conducting i
nspections of Project Work.

LABORATORY means the designated laboratory authorized by the Engineer to test materials and work involved in the contract.

LOSS, LOSSES mean any and all economic and non-economic injuries, losses, costs, liabilities, claims, damages, actions, judgments, settlements, expenses, fines and penalties. “Losses” do not include attorney’s fees or court costs, whether arising as an expense or cost or legal proceeding to which Contractor is a party or as a consequential damage claimed against Contractor by any third person.

MINOR CHANGE means a Change in the Work that does not involve either performance of Extra Work or an adjustment to the Contract Sum or Contract.

MODIFICATION means a written agreement of City and Contractor that amends, adds to or revises the provisions of the Construction Contract or other Contract Documents.

Page 455 of 751 ends

GP-1
NOTICE OF COMPLETION means the written notice by Engineer confirming the date that the Project Work is Finally Completed.

NOTICE TO PROCEED means the written notice issued by City to Contractor to begin the Project Work.

PLANS means the graphic and pictorial portions of the Contract Documents prepared by the Architect or a City Consultant showing the design, location and dimensions of the Work, including plans, elevations, details, schedules and diagrams. The term “Plans” is used interchangeably with “Drawings.”
PROGRESS PAYMENTS means a monthly payment of a portion of the Contract Sum based on Contractor’s progress in the performance of the Work.

PROJECT COMPLETION DATE means the point at which the Project Work is: (1) sufficiently and entirely complete in accordance with Contract Documents so that such Work can be utilized for its intended purpose, (2) receipt by City of all permits and certificates by Governmental Authorities, if any, required to occupy and use such Work, and (3) all systems included in the Work are operational as specified, all designated or required inspections and certifications by Governmental Authorities have been made and posted and has been completed.

PROJECT OR PROJECT WORK means the totality of the Work to be performed by Contractor under the terms of the Contract Documents covered by the Project Contract.

REQUEST FOR EXTENSION means a formal written request required to be submitted by Contractor setting forth the justification and support for Contractor’s request for adjustment in the Contract Time due to an Excusable Delay or Compensable Delay.

REQUEST FOR INFORMATION means a written request by Contractor for clarification of what it perceives to be discrepancies in the Contract Documents, including, without limitation, information in the Contract Documents constituting errors, omissions, conflicts, ambiguities, lack of coordination, noncompliance with Applicable Laws or variances between the information in the Contract Documents and field conditions.

SPECIFICATIONS mean the portion of the Bidding Documents consisting of the written requirements for materials, equipment, standards and workmanship for the Work and performance of related services.

SPECIAL DAYS means the local holiday shopping season from the second Friday of December through Christmas Day.

SUBCONTRACTOR means a person or entity that has a contract to perform a portion of the Work, including without limitation, subcontractors, sub-subcontractors, suppliers and vendors, of any and every Tier.

S
URETY means Contractor’s surety issuing the Bid, Performance and/or Labor and Material Bonds.

Page 456 of 751 ends

GP-1
TIER means the contractual level of a Subcontractor with respect to Contractor. For example, a “first-tier” Subcontractor is under contract with Contractor. A sub-subcontractor under contract with a first-tier Subcontractor is in the “second tier,” and so on. Use of the phrase “of every tier”, or similar phraseology, in the Contract Documents shall not be interpreted as implying that other provisions of the Contract Documents, where such phases are not used, are intended to be limited application to only the first Tier or to only certain Tiers of Subcontractors.

UNEXCUSED DELAY means any Delay that is not a Compensable Delay or Excusable Delay, including, without limitation, the following: (1) Delay caused by Contractor’s failure to comply with the Contractor’s Documents, (2) Delay for which Contractor has failed to provide timely and complete Request for Extension, or (3) Delay associated with any circumstances where costs or risk associated with such circumstances are designated in the Contract Documents as being at Contractor’s risk or Contractor’s Own Expense.

UNILATERAL CHANGE ORDER means a writing signed by City in accordance with the General Conditions, in which City unilaterally sets forth its determination of the amount of adjustments to the Contract Sum or Contract Time due to a Compensable Change, Compensable Delay or Deleted Work.

WORK means the labor, materials, equipment, services, permits, licenses and taxes and all other things necessary for Contractor to perform its obligations under the Contract Documents, including, without limitation, any Changes requested by City.

WORKING DAY means Mondays, Tuesdays, Wednesdays, Thursdays and Fridays. It does not include Saturdays, Sundays, or Holidays recognized by the City of Montebello.

Other terms appearing in the Standard Specifications shall have the intent and meaning specified therein.

1-7 AWARD AND EXECUTION OF THE CONTRACT.

1-7.1 General.

Subsection 1-7.1 of the Standard Specifications is hereby replaced with the following:

Within ten working days after the date of the AGENCY’s notice of award, the Contractor shall execute and return the following contract documents to the AGENCY:

• Contract Agreement

• Faithful Performance Bond
• Material and Labor Bond
• Public Liability and Property Damage Insurance Certificate

•
Worker’s Compensation Insurance Certificate
• Project Schedule

Page 457 of 751 ends

GP-1
Failure to comply with these requirements will constitute non -responsiveness on the part of the Contractor and will result in annulment of the award by the Agency and forfeiture of the Proposal Guarantee by the Contractor.

The Contract Agreement shall not be considered binding upon the AGENCY until executed by the authorized AGENCY official.

A corporation to which an award is made may be required, before the Contract Agreement is executed by the AGENCY, to furnish evidence of its corporate existence, of its right to enter into contracts in the State of California, and of the authority of its officers to sign contracts and bonds for the corporation.

1-7.2 CONTRACT BONDS.

The second sentence of the fourth paragraph of Subsection 1-7.2 of the Standard Specifications is hereby deleted and replaced with the following: The Faithful Performance Bond (Warranty Bond) shall remain in force until one (1) year of recordation of the Notice of Completion. The Material and Labor Bond shall remain in force until thirty -five days after the date of recordation of the Notice of Completion.

The second and third sentences of the third paragraph of Subsection 1- 7.2 of the Standard Specifications are hereby deleted and replaced with the following: The “Payment Bond” (Material and Labor Bond) shall be for not less than 50 percent of the contract price, to satisfy claims of material suppliers and of mechanics and laborers employed by it on the work. The Payment Bond shall remain in effect until thirty-five days after the date of recordation of the Notice of Completion. 1-8 SUBCONTRACTS

The Contractor shall perform or provide, with its own organization, contract labor, materials, and equipment amounting to at least 50 percent of the Contract Price. The contract labor performed or provided by the Contractor shall amount to at least 25 percent of the total contract labor for the Contract. Contract labor shall exclude the Contractor’s superintendent. Any designated “Specialty Items” may be performed by subcontract and the amount of any such “Specialty Items” so performed may be deducted from the Contract Price before computing the amount of contract labor, materials, and equipment required to be performed or provided by the Contractor with its own organization. Where an entire item is subcontracted, the value of contract labor, materials, and equipment subcontracted will be based on the estimated percentage of the Contract Unit or Lump Sum Price, determined from infor mation submitted by the Contractor, subject to approval by the Engineer.

The Contractor with the bid package shall submit a list of all subcontractors intended to perform work on the project. This list shall include the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in

Page 458 of 751 ends

GP-1
an amount in excess of one-half of one percent of the prime contractors total bid. The prime contractor shall provide a description by bid item number or otherwise fully designate the portion of work to be performed by each subcontractor.

SECTION 2 – SCOPE OF THE WORK
2-2 PERMITS.

The text of Subsection 2-2 of the Standard Specifications is hereby deleted and replaced with the following:

Prior to the start of any work, the Contractor shall take out the applicable City permits and make arrangements for City inspections. The City will issue the permits at no charge to the Contractor.

The Contractor and all subcontractors shall each obtain a City business license, and shall be licensed in accordance with the State Business and Professions Code. The Contractor shall also obtain any and all other permits, licenses, inspections, certificates, or authorizations required by any governing body or entity.

The Contractor shall pay all costs incurred by the permit requirements.

Wherever the property of the Federal Government, the State of California, the County of Los Angeles, the City of Montebello, any local utilities, or of any other agency affected by the work included in this contract, the Contractor shall bear the cost of all permits and inspection lawfully exacted by said Government, State, County, City, District, Department, or other agency during the time of performing the work affecting said property; also, the Contractor shall bear all cost of traffic regulation and traffic control devices lawfully exacted by said State, County, City, or other agency during the time of performing the work affecting said property.

Where required under the terms of the permits, the Contractor shall obtain liability insurance acceptable to and in an amount required by the public agency having jurisdiction. The policy shall insure said agency against all claims arising out of or in connection with the work to be performed and shall remain in full force and effect until the work is accepted by the City. The Contractor shall furnish to each such agency a certificate of protective liability insurance showing the protection afforded and the amount thereof.

Neither the terms hereof nor anything shown on the drawings in connection with rights -of-way provided by the City shall be construed to entitle the Contractor to conduct operations in said rights-of-way in violation of existing regulations restricting inte rference with watercourses and drainage channels. The Contractor shall take adequate precautions against obstructing storm water flow in any affected watercourse or channel, and shall not deposit excavated materials in any area where they might interfere with or be subject to erosion from such flow.

2-5 THE CONTRACTOR’S EQUIPMENT AND FACILITIES.

The following is hereby added to this subsection of the Standard Specifications:

2-5.5 A noise level limit of 86 dba at the distance of fifty feet shall apply to all construction equipment on or related to the job whether owned by the Contractor or not. The use of excessively loud warning signals shall be avoided except in those cases required for the protection of personnel.

Page 459 of 751 ends

GP-1
2-5.6 All noise producing project equipment and vehicles using internal combustion engines shall be equipped with mufflers, and air inlet silencers where appropriate, in good operating condition that meet or exceed original factory specifications. Mobile or fixed “package” equipment (e.g. arc-welders, air compressors) shall be equipped with shrouds and noise control features that are readily available for that type of equipment.

2-5.7 All mobile or fixed noise producing equipment used on the project, which is regulated for noise output by a local, state, or federal agency, shall comply with such regulation while in the course of project activity.
2-5.8 Electrically powered equipment instead of pneumatic or internal combustion powered equipment shall be used, where feasible.

2-5.9
Material stockpiles and mobile equipment staging, parking, and maintenance areas shall be located as far as practical from residences.

2-5.10 The hours of conventional construction activities shall be restricted to the periods and days permitted by the local noise or other applicable ordinance. In accordance with the City of Montebello Noise Ordinance, these activities include (but are not limited to) construction, noisy maintenance activities, all spoils and material transport, demolition, and grading and are prohibited between the hours of 4:00 p.m. and 8:00 a.m. on weekdays (Monday through Friday), Saturday and Sundays, and legal holidays, except in cases of emergency as determined and approved in writing by the City Engineer.
2-5.11 The use of noise producing signals, including horns, whistles, alarms, and bells shall be for safety warning purposes only.

2-5.12 No project related public address, paging, two-way radio, or music system shall be audible at any adjacent residence.

2-5.13 The on-site construction supervisor shall have the responsibility and authority to receive and resolve noise complaints. An appeal process to the City shall be established prior to construction commencement that will allow for resolution of noise problems that cannot be immediately solved by the site supervisor.

2-5.14 The Contractor shall develop a project noise control plan, which shall be approved and implemented prior to commencement of any construction activity.

2-5.15 Noise control features and plans shall be reviewed and approved by a noise control engineering professional.

2-5.16 Contract incentives may be offered to the construction contractor to minimize or eliminate noise complaints resulting from project activities.

2-5.17 The erection of temporary sound wall barriers shall be considered where project activity is unavoidably close to residences.

Page 460 of 751 ends

GP-1
2-5.18 Caltrans Standard Specifications (Sections 7 and 42) and Standard Special Provisions (that provide limits on construction noise levels) shall be applied and enforced by the City on the project Contractor.

2-5.19 Arrange noisiest operations together in the construction program to avoid continuing periods of annoyance.

2-5.20 If practical, implement project noise abatement features prior to construction.

SECTION 3 – CONTROL OF THE WORK
3-2 SELF -PERFORMANCE.

The whole paragraph of Subsection 3- 2 of the Standard Specifications is hereby deleted and replaced with the following:

The Contractor shall perform or provide, with its own organization, contract labor, materials, and equipment amounting to at least 50 percent of the Contract Price. The contract labor performed or provided by the Contractor shall amount to at least 25 percent of the total contract labor for the Contract. Contract labor shall exclude the Contractor’s superintendent. Any designated “Specialty Items” may be performed by subcontract and the amount of any such “Specialty Items” so performed may be deducted from the Contract Price before computing the amount of contract labor, materials, and equipment requ ired to be performed or provided by the Contractor with its own organization. Where an entire item is subcontracted, the value of contract labor, materials, and equipment subcontracted will be based on the estimated percentage of the Contract Unit or Lump Sum Price, determined from information submitted by the Contractor, subject to approval by the Engineer.

The Contractor with the bid package shall submit a list of all subcontractors intended to perform work on the project. This list shall include the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one -half of one percent of the prime contractors total bid. The prime contractor shall provide a description by bid item number or otherwise fully designate the portion of work to be performed by each subcontractor.

3-7 CONTRACT DOCUMENTS.

The contract comprises the following documents, including all additions, deletions, modifications, and appendices and all addenda as prepared prior to the date of bid opening setting forth modifications or interpretations of any of said documents:

The Notice of Inviting Bids, the Instructions to Bidders, the accepted Proposal, the List of Subcontractors, the Bid Security Forms, the Agreement, the Faithful Performance Bond, the Payment Bond, Bid Bond, the Plans, General Provisions and the Special Provisions.

Page 461 of 751 ends

GP-1
3-7.1 General.

The following is hereby added to this subsection of the General Specifications:

The Contractor shall maintain a control set of Plans and Specifications on the project site at all times. All final locations determined in the field, and any deviations from the Plans and Specifications, shall be marked in red on this control set to show the as -built conditions. Upon completion of all work, the Contractor shall return the control set to the Engineer. Final payment will not be made until this requirement is met.

3-7.2 PRECEDENCE OF THE CONTRACT DOCUMENTS.

The whole Subsection 3-7.2 of the Standard Specifications is hereby deleted and replaced with the following:

All of the CONTRACT DOCUMENTS shall be read as complimentary to one another and requiring the highest quality, highest quantity, and highest standard of performance for the Project for the City’s benefit. In the case of a direct conflict between any of the CONTRACT DOCUMENTS, the order of precedence of the CONTRACT DOCUMENTS shall be:

FIRST: Requirements of law, including the Charter and Ordinances of the City.

SECOND: Permits
from other Agencies as may be required by law or
Ordinance.

THIRD: Permits from City Departments as may be required by law or Ordinance.

FOURTH: Change Orders and/or Supplemental Agreements; whichever occurs last.

FIFTH: Contract/Agreement.

SIXTH: Addenda.

SEVENTH: Bid/Proposal.

EIGHTH: Special Provisions.

NINETH: Plans.

TENTH: Standard Plans.

ELEVENTH: Standard Specifications.

TWELFTH: Reference Specifications.

Detailed plans shall have precedence over general plans.

Page 462 of 751 ends

GP-1
3-10 SURVEYING.

3-10.1 General.

The whole Subsection 3- 10.1 of the Standard Specifications is hereby deleted and replaced with the following:

The Contractor shall provide construction survey if necessary and as requested by the City Engineer for all the streets shown in the contract documents, including office research of notes, plats or other necessary documents; marking removal limits; grade staking; tying and relocating utilities. All work shall be done to the satisfaction of the Engineer.

The Contractor shall notify the City of Montebello, in advance, in the event that any monumentation or witnesses to the monumentation should fall within any removal area.

The Land Surveyor hired by the Contractor shall prior to submittal of the bid, visit the sites or use an internet mapping service to determine the locations and identify all existing centerline ties and monuments and document all theses locations . Contractor shall attach a list of these ties and monuments locations and their description to the bid.

The Contractor shall be liable for a back charge in an amount up to $1,000.00 per point obliterated or destroyed without notice or authorization from the City of Montebello.

All work described in this Section shall be done by or under the direction of a Professional Land Surveyor or a Registered Civil Engineer authorized to practice Land Surveying in the State of California herein referred to as “Surveyor”.

SECTION 4 - CONTROL OF MATERIALS
4-1 GENERAL.

The following is hereby added to this subsection of the Standard Specification:

The Contractor and all subcontractors, suppliers, and vendors, shall guarantee that the entire work will meet all requirements of this contract as to the quality of materials, equipment, and workmanship. The Contractor, at no cost to the AGENCY, shall make any repairs or replacements made necessary by defects in materials, equipment, or workmanship that become evident within one (1) years after the date of recordation of the Notice of Completion. Within this one- year period, the Contractor shall also restore to full compliance with requirements of this contract any portion of the work which is found to not meet those requirements. The Contractor shall hold the AGENCY harmless from claims of any kind arising from damage s due to said defects or noncompliance. The Contractor shall make all repairs, replacements, and restorations within thirty(30) days after the date of the City Engineer’s written notice.

Page 463 of 751 ends

GP-1

4-6 TRADE NAMES.

The first and second paragraphs of this subsection of the Standard Specifications are hereby replaced with the following:

Although the bidder may believe that by use of a different material than that specified on/in the plans and specifications, a lower cost project/bid may result. The bidder is to bid the project on the basis of using the material(s) as named keeping in mind that all materials named herein by manufacturer is not to prohibit the bidder considering using in his bid what he consider to be an equal material except where the AGENCY has designated a sole product. Once the bids have been opened the successful Contra ctor may discuss with the AGENCY the use of another product; which may result in a determination by the AGENCY that the other product is equal and possibly that by the AGENCY allowing the use of the Contractor proposed equal that a change in the contract amount may result.

SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITIES

5-3 LABOR.
5-3.2 Prevailing Wages.

The following is hereby added to this subsection of the Standard Specifications:

The Contractor, and all subcontractors, suppliers and vendors, shall comply with all AGENCY, State and Federal orders regarding affirmative action to ensure equal employment opportunities and fair employment practices. Failure to file any report due under said orders will result in suspension of periodic progress payments. The Contractor shall ensure unlimited access to the job site for all equal employment opportunity compliance officers. In accordance with the labor Code, as provided in Section 1773 et seq., the City has on file in the City Clerk’s office the latest prevailing rates as established by the Director of Industrial Relations of the State of California.

The Contractor shall not pay less than these rates.

The following subsection(s) are hereby added to Section 5-3 of the Standard Specifications

5-3.6 Laws .

The Contractor, and all subcontractors, suppliers and vendors, shall comply with all City, State and Federal orders regarding affirmative action to ensure equal employment opportunities and fair employment practices. Failure to file any report due under said orders will result in suspension of periodic progress payments. The Contractor shall ensure unlimited access to the job site for all equal employment opportunity compliance officers. In accordance with the labor Code, as provided in Section 1773 et seq., the City has on file in the City Clerk’s office the latest prevailing rates as established by the Director of Industrial Relations of the State of California. The Contractor shall not pay less than these rates.

Page 464 of 751 ends

GP-1
5-4 INSURANCE.

5-4.2 General Liability Insurance.

The whole Subsection 5-4.2 of the Standard Specifications is hereby deleted and replaced with the following:

CONTRACTOR shall carry and maintain Comprehensive General Liability Insurance which provides the following:

Minimum coverage: Bodily injury limits of $2,000,000 for each person and $2,000,000 for each occurrence; property damage limits of $2,000,000 for each occurrence, $5,000,000 aggregate.

Products/Completed Operations Hazard Insurance in an amount of not less than FIVE MILLION DOLLARS ($5,000,000).

A combined single limit policy with aggregate limits in an amount of not less than Five MILLION DOLLARS ($5,000,000) shall be considered equivalent to the said required minimum limits set forth herein above.

If a Commercial General Liability Insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Contract or the general aggregate limit shall be at least twice the required occurrence limit.

Such coverage shall include but shall not be limited to, protection against claims arising from bodily and personal injury, including death resulting therefrom, and damage to property resulting from activities contemplated under this Contract, including the use of owned and non-owned real property and automobiles. Insurance coverage shall not be subject to any type of pollution exclusion or owned property exclusions.
5-4.3 Worker's Compensation Insurance.

The following is hereby added to this subsection of the Standard Specification:

CONTRACTOR shall carry and maintain worker’s compensation in the amount of $1,000,000 as required by the California Labor Code for all persons employed directly or indirectly in connection with this Contract by CONTRACTOR. To the extent that CONTRACTOR utilizes any subcontractor for the performance of any part of the work under this Contract, CONTRACTOR shall require and assure that such subcontractor also carry and maintain worker’s compensation as required by the California Labor Code for all persons directly or indirectly in connection with this Contract.

5-4.4 Auto Liability Insurance.

Th
e whole Subsection 5-4.4 of the Standard Specifications is hereby deleted and replaced with the following:

CONTRACTOR shall carry and maintain Automobile Liability Insurance which provides a minimum coverage of at least $5,000,000 per accident for bodily injury and property damage.

The following is hereby added to subsection 5-4 of the Standard Specifications:

Page 465 of 751 ends

GP-1
5-4.5 Additional Insureds.

The CITY, its officers, agents and employees must be named as additional insureds or as additional loss payees in all insurance policies required by this Contract. An endorsement to this effect shall be delivered to CITY prior to the commencement of any work. Satisfaction of any deductible requirement shall be the responsibility of CONTRACTOR. Such insurance shall be primary and noncontributory with any other insurance maintained by the CITY.

5-4.6 Notice of Cancellation.

CONTRACTOR agrees to oblige its insurance agent or broker and insures to provide CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.

5-4.7 Severability Clause.

Each of the policies of insurance shall contain a clause substantially as follows:

The insurance afforded by this policy applies separately to each insured against whom a claim or suit is made, or suit is brought, except with respect to the limit of the insurer's liability.
5-4.8 Qualifications of Insurer.

All policies of insurance shall be issued by an insurance company acceptable to CITY and authorized to issue said policy in the State of California.

5-4.9 Approval of Insurer.

The insurance carrier providing the insurance shall be chosen by CONTRACTOR subject to approval by CITY, provided that such approval shall not be unreasonably withheld.

5-4.10 Payment of Premiums.

All premiums on insurance policies shall be paid by CONTRACTOR making payment, when due, directly to the insurance carrier, or in a manner agreed to by CITY. 5-4.11 Evidence of Insurance and Claims.

CONTRACTOR shall provide certificates of insurance to CITY as evidence of insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. The CITY’s Risk Manager must approve insurance certificates and endorsements prior to commencement of performance. Current certification of insurance shall be kept on file with the CITY at all times during the term of this Contract. The CITY reserves the right to require complete, certified copies of all required insurance policies, at any time.

Page 466 of 751 ends

GP-1
5-7 SAFETY.

5-7.1 Work Site Safety.
5-7.1.1 General.

The following is hereby added to subsection 5-7.1.1 of the Standard Specifications:

It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor shall use foresight and shall take such steps and precautions as its operations warrant to protect the public from danger, loss of life or loss of property, which would result from interruption or contamination of public water supply, interruption of other public services, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the work, which will require that immediate and unusual provisions be made to protect the public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of work under this contract.

Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor’s operations and when, in the opinion of the Engineer, immediate action shall be considered necessary in order to protect the public or property due to the Contractor’s operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation within a reasonable time period, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Engineer may seem reasonable and necessary.

The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the AGENCY for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. However, if the AGENCY does not take such remedial measures, the Contractor is not relieved of the full responsibility for public safety.

The following subsection(s) are hereby added to Section 5-7 of the Standard Specifications:

5-7.9 Traffic and Access.

The Contractor shall notify the occupants of all affected properties in writing at least forty-eight (48) hours (2 working days) prior to any temporary obstruction of access. Contractor to revise all dates daily on no-parking signs. If works does not begin on the date posted on the no- parking sign, Contractor then shall replace all signs with the new correct dates. Vehicular access to the property line shall be maintained except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed except as permitted by the Engineer.

At least one twelve-foot-wide traffic lane shall be provided for each direction of travel on all streets at all times except as permitted by the Engineer. The Contractor must submit a traffic

Page 467 of 751 ends

GP-1
control plan to the City and obtain approval of same in writing from the City Engineer. The Contractor shall maintain at least one lane of traffic in each direction at all times during construction. The plan shall be prepared per latest edition of California Manual on Traffic Control Devices (CA-MUTCD).

All driveways have to be open for access during project non -construction hours and days which may require use of plating and other devices or methods.

Under situations of driveway closure to pedestrians, the Contractor shall post advance notice on barricades to direct pedestrian to use the sidewalk on the opposite side of the street or the Contractor may elect to provide continuous K-rail in the curb lane to allow pedestrians to walk in the curb lane behind the K-rail. Any and all devices such as plates, barricades, K-rails and notices shall be continuously maintained for pedestrian and vehicle safety. No curb lanes shall be closed during non-working days of the week. Appropriate advance warning signs shall be continuously maintained as needed during the project. All such devices, warning signs and interruptions of normal vehicle lanes, parking lanes and pedestrian walkways shall be shown on the Traffic Control Plan for advance approval by the City.

Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.

Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.

Any striped roadway shall be delineated by the Contractor with temporary raised reflective markers when it is to be left un-striped overnight.

5-7.9.1 Street Closures, Detours, Barricades.

This subsection is hereby added to section 5- 7.9 of the Standard Specifications: Street closures will not be allowed except as specifically permitted by the Engineer.

At the Pre -Construction meeting, the Contractor shall submit to the Engineer a detailed written plan for traffic control and construction sequencing for the project. The plan shall include drawings as necessary to clearly outline how traffic flow and pedestrian walkways will be handled during the course of construction and where detour and advance notice signs will be posted.

Traffic lane transitions shall not be sharper than a taper of thirty to one. Temporary traffic channelization shall be accomplished with barricades, K -rail sections or delineators. Temporary striping will not be allowed unless specifically permitted by the Engineer. The Contractor shall prepare any plans that may be required for te mporary striping to the satisfaction of the Engineer.

In no event will temporary striping be allowed to remain on finish pavement surfaces.

In no case shall traffic be diverted from the existing traveled way without prior approval of the City Engineer.

Page 468 of 751 ends

GP-1
The contractor shall include in his Traffic Control Plan use of lighted electronic message boards to notify traffic of project and any changes in vehicle or pedestrian travel routes.

If the Contractor shall fail to provide and install any of the signs or traffic control devices ordered by the Engineer, the Engineer may either stop the work or cause such signs or traffic control devices to be placed by others and charge the cost therefor against the Contractor, and deduct same from the next progress payment

5-7.9.2 Protection of the Public.

This subsection is hereby added to section 5-7.9 of the Standard Specifications:

It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor shall use foresight and shall take such steps and precautions as its operations warrant to protect the public from danger, loss of life or loss of property, which would result from interruption or contamination of public water supply, interruption of other public services, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the work, which will require that immediate and unusual provisions be made to protect the public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of work under this contract.

Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor’s operations and when, in the opinion of the Engineer, immediate action shall be considered necessary in order to protect the public or property due to the Contractor’s operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation within a reasonable time period, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Engineer may seem reasonable and necessary.

The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the City for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. However, if the City does not take such remedial measures, the Contractor is not relieved of the full responsibility for public safety.

Page 469 of 751 ends

GP-1
SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK

6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK.

The following is hereby added to this subsection of the Standard Specifications:

The Contractor’s proposed Construction Schedule shall be submitted to the Engineer within ten working days after the date of the Agency’s execution of the Contract Agreement. The schedule shall be supported by written statements from each supplier of materials or equipment indicating that all orders have been placed and acknowledged and setting forth the dates that each item will be delivered.

Prior to issuing the Notice to Proceed, the Engineer will schedule a preconstruction meeting with the Contractor to review the proposed Construction Schedule and delivery dates, arrange utility coordination, discuss construction methods, and clarify inspection procedures.

The Contractor shall submit periodic Progress Reports to the Engineer by the last day of each month. The Report shall include an updated Construction Schedule. Any deviations from the original schedule shall be explained. Progress payments will be withheld pending receipt of any outstanding reports.

6-3 TIME OF COMPLETION.

6-3.1 General.

This subsection of the Standard Specifications shall be replaced by the following:

All construction work is to be completed within ninety (90) working days. 6-3.2 Contract Time Accounting.

The following is hereby added to this subsection of the Standard Specifications:

The Contractor’s activities shall be confined to the hours between 7:00 a.m. and 3:30 p.m., Monday through Friday, excluding holidays, for daytime work and to the hours between 8:00 p.m. starting Monday and 5:00 a.m. ending Saturday, excluding holidays, for nighttime work. Deviation from these hours will not be permitted without the prior consent of the Engineer, except in emergencies involving immediate hazard to persons or property. In the event of either a requested or emergency deviation, inspection service fees will be charged against the Contractor. The service fees will be calculated at overtime rates including benefits, overhead, and travel time. The service fees will be deducted from any amounts due the Contractor. Should the Contractor choose nighttime work, any and all lighting and traffic control, as needed, shall be provided by the Contractor.

6-9 LIQUIDATED DAMAGES

The liquidated damages value is hereby amended to be $500.00 per day.

Page 470 of 751 ends

GP-1
SECTION 7 – MEASUREMENT AND PAYMENT

7-3 PAYMENT

7-3.2 Partial and Final Payment.

The text of Subsection 7-3.2 of the Standard Specifications is hereby deleted and replaced with the following:

The closure date for the purpose of making partial progress payments will be on or about the twenty-fifth (25th) day of each month. The Contractor shall prepare the approximate measurement of the work performed through the closure date and submit it to the AGENCY for approval along with an updated construction schedule.

When the work is complete, the Engineer will determine the final quantities of the work performed and prepare the final progress payment.

Payments are commonly authorized and made within forty-five days following the last day of the month submitted. However, payments will be withheld pending receipt of any outstanding reports required by the contract documents. In addition, the final progress payment will not be released until the Contractor returns the control set of Plans and Specifications showing the as -built conditions and any other required documents.

A full five percent (5%) retention will be deducted from all progress payments. The final retention will be authorized for final payment forty-five (45) days after the date of recordation of the Notice of Completion.

Decisions to Withhold Progress Payments

The Engineer may withhold or nullify the requested Progress Payments in whole or in part due to the Contractor to such extent as may be necessary to protect the City from loss as a result of because of any of the circumstances listed below:

1. Defective work not remedied in accordance with provisions of the Contract Documents;

2. Third party claims, liens or stop notices filed or reasonable evidence indicating probable filing of such claims, liens or stop notices;

3. Failure of the Contractor to make payments properly for labor, services, materials, equipment, or other facilities or to subcontractor;

4. A reasonable doubt that the work can be completed for the unpaid balance of the Contract Sum;

5. A reasonable doubt that the Contractor will complete the work within the agreed Contract Time;

6. Costs to the Owner resulting from failure of the Contractor to complete the work within the stipulated time, or in accordance with the terms of the contract;

Page 471 of 751 ends

GP-1

7. Damage to other work or property;

8. Failure to fulfill all the requirements of the Contract Documents;

9. When there is pending litigation against the City related to this contract or reasonable anticipation thereof;

10. Failure of the contractor to maintain all records as required; to submit progress schedules, weekly payroll records, minority enterprise utilization reports and forms and any other such item required by these specifications;

11. Failure to pay laborers and mechanics employed by the contractor or any subcontractor on the work the full amount of wages required by this contract, after written notice to the contractor.

12. Failure of Contractor of the subcontractors to comply with applicable laws;

13. Any reason specified elsewhere in the Contract Documents as grounds for a withholding, offset or setoff or that would legally entitle City to a setoff or recoupment;

14. Additional professional, consultant or inspection services required due to Contractor’s failure to comply with Contract Documents;

15. Liquidated damages payable to City;

16. Materials ordered or paid by City on behalf of Contractor;

17. Damage loss caused to City, a separate contractor, homeowner contractor or any other person or entity due to the actions of the Contractor;

18. Cleanup performed by City and chargeable to Contractor;

19. Failure of Contractor to pay contributions due and owing to employee benefits funds pursuant to applicable collective bargaining agreements or trust agreements;

20. Failure of Contractor or any Subcontractor to properly pay prevailing wages as defined in California Labor Code Section 1720 et/ seq.;

21. A breach by Contractor of any obligation or provision of the Contract Documents.

22. Whenever the City shall, in accordance herewith, withhold any monies otherwise due the Contractor, written notice of the amount withheld and the reasons therefore shall be given the Contractor, and, when the Contractor shall remove the grounds for such withholding, the City will pay to the Contractor, within 35 calendar days, the amount so withheld.

Page 472 of 751 ends

GP-1
Application of Withholding

Sums properly withheld in good faith may be used by City without a prior judicial determination of City’s actual rights with respect to recovery of any Loss on which such withholding is based.

Contractor agrees and hereby designates City as its agent in for such purposes, and agrees that such payments shall be considered as payments made under the Construction Contract by City to Contractor. City shall submit to Contractor accounting of such funds disbursed on behalf of Contractor. As an alternative to such payment, City may, in its sole discretion, elect to exercise its rights to adjust the Contract Sum.

Payment by City

After an Application for Progress Payment has been made, the City shall make payment in a timely manner unless there is a good faith reason for withholding the payments in accordance with the provisions of the Contract Documents or Applicable Law.

Payment to Subcontractors

Upon receipt of payment from City, Contractor shall pay the Subcontractors performing the Work, out of the amount paid to Contractor on account of such Subcontractor’s portion of the work, the amount of which said Subcontractor is entitled in accordance with the terms of its contract with Contractor and Applicable Laws, including, without limit ation, California Public Contract Code Section 7107. Contractor shall remain responsible, notwithstanding a withholding by City pursuant to the terms of these General Conditions, to promptly satisfy from its own funds sums due to all Subcontractors who have performed the Work that is included in Contractor’s Application for Payment. Contractor shall, by appropriate agreement, require each Subcontractor to make payments to its sub- contractors and suppliers in similar manner. City shall have no obligation to pay or be responsible in any way for payments to Subcontractors, of any Tier.

Direct Negotiation of Stop Notices

City shall have the right to directly discuss, negotiate, settle or pay, without notice to or participation by Contractor, any stop notice claims asserted by the Subcontractors, of any Tier, and to deduct such sums paid from sums due to Contractor.

Release of Stop Notices

Except to the extent of any payments that City fails to make to Contractor under circumstances that constitute a breach by City of its payment obligations under the Contract Documents, if any stop notice, whether invalid or valid, is made, filed with, served upon or asserted against City or a Homeowner by any of the Subcontractors, of any Tier, or their agent or employee, for money claimed due for Work of any kind provided, then Contractor shall within five (5) Days after written notice by City and at Contractor’s Own Expense, procure, furnish and record appropriate releases or other instruments which under Applicable Laws will full release, extinguish and removed such stop notice. Unless and until such stop notice is fully released as afore-stated, City shall have the right to retain from any payments then due, or thereafter to become due, an amount equal to one hundred and fifty percent (150%) of the amount necessary to satisfy, discharge and defend against any such stop notice and any action or proceeding thereon which may be brought to judgment or award. If the amount to be paid, or the amount retained thereon, is insufficient to satisfy, discharge

Page 473 of 751 ends

GP-1
or defend against such stop notice and any action of proceeding thereon, then Contractor shall be liable for the difference and upon written demand shall immediately deposit the same with City.

The provisions in this paragraph are in addition to such other rights as City may have against Contractor under the Contract Documents or Applicable Laws.

Failure of Payment by City
If, through no fault of Contractor or failure by Contractor to comply with its obligations under the Contract Documents, Payment is not issued within thirty (30) Days after receipt of an undisputed and properly prepared and submitted Application for Payment then Contractor may, upon fourteen (14) additional Days’ written notice to City, stop the Project Work for which such Application for Payment is received until payment is received as to any undisputed and owing work. Any resulting Delay associated with the shut down and start -up of the Project Work as a result of Contractor’s proper exercise of its rights under this paragraph shall constitute a Compensable Delay.

Disputed Payments, Continuous Work

No dispute or disagreement with respect to the amount of any payment claimed due by Contractor shall relieve or excuse Contractor from the obligation to proceed with and maintain continuous, expeditious and uninterrupted performance of the Work.

Completion. Inspection. Punch List. Re-Inspection

A Contractor-generated punch list must be provided to the City or its representative prior to the request for final inspection. It will be the discretion of the City or its representative to grant the final inspection based on the Contractor generated punch list. Contractor shall achieve Completion of the Project Work in accordance with the requirements of the Contract Time and other provisions of the Contract Documents. Contractor shall notify Engineer when Contractor believes that the Project Work for is Complete.

Unless the Engineer determines that the Project Work is not sufficiently complete to warrant an inspection to determine Compliance, the Engineer, accompanied by the Inspector of Record and any others deemed appropriate by the Engineer, will inspect the Project Work performed.

Contractor, along with such Subcontractors and others as Engineer deems necessary shall participate in the inspection. If the Project Work is found to be Complete, then Engineer shall proceed to issue a written completion notice as provided hereinafter.

Any items necessary for Compliance that are found missing, incomplete or requiring correction shall be summarized by Contractor in a Completion Punch List and promptly signed by Contractor and delivered to Engineer. Contractor shall proceed within forty-eight (48) hours after signing the Completion Punch List to commence correction and completion of the items listed.

Contractor shall notify Engineer when the items listed are completed at which time a re-inspection shall be scheduled in the same manner as the original inspection. If said inspection discloses any item, whether or not included on the original Punch List, which is found missing, incomplete, or requiring correction said item shall be corrected before a Notice of Completion shall be issued.

Th
e City shall be reimbursed or at its option shall withhold from Contractor’s payments, amounts incurred by City to conduct more than two (2) inspections to determine Compliance of the Project

Page 474 of 751 ends

GP-1
Work. A Notice of Completion shall be issued by the Engineer when he determines that Compliance of the Project Work has occurred.

Final Completion

Contractor shall expeditiously and diligently perform all items of Project Work on the Final Completion Punch List so as to achieve Final Completion of the Project Work within the requirements of the Contract Time for Final Completion of the Project Work. Contractor shall forward to Engineer a written notice when Contractor believes that it has completed all of the items on the Final Completion Punch List and is read for a Final Completion Inspection. Unless Engineer determines that the Project Work is not sufficiently complete to warrant an inspection to determine Final Completion, Engineer, accompanied by Inspector of Record and any others deemed appropriate by Engineer, will inspect Project Work performed. If the Project Work is found to be Finally Complete, then Engineer shall proceed to issue a Notice of Final Completion as provided hereinafter.

If said inspection discloses any item, whether or not included on the Final Completion Punch List, which is found missing, incomplete, or requiring correction said item shall be corrected before a Notice of Final Completion shall be issued. The City shall be reimbursed or at its option shall withhold from Contractor’s payments, amounts incurred by City to conduct more than two (2) inspections to determine Final Compliance of the Project Work for any Home. A Notice of Final Completion shall be issued by the Engineer when he determines that Final Compliance of the Project Work has occurred.

Concluding Payment
Upon issuance by Engineer of the Notice of Final Completion for the Project Work Contractor shall submit to Engineer its Application for Payment requesting payment for completion. Without limitations to any other conditions to payment set forth elsewhere in the Contract Documents, the following shall be conditions precedent to a proper submission, and to Engineer’s approval, of Contractor’s Application for Final Payment:

1. Submission of an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with the Project Work for which City or City’s or Homeowner’s property or funds might be liable have been paid or otherwise satisfied;

2. Submission of consent of Surety, if any, to Completion Payment;

3. Submission of a certificate evidencing that the insurance required by the Contract Documents is in force;

4. Submission of conditional releases and waivers of stop notice and bond rights upon final payment in the form required by California Code Section 3262(d)(3) executed by Contractor and by all Subcontractors, of every Tier, performing any portion of the Project Work;

5. Submission of all Close-Out Documents for the Project Work;

Page 475 of 751 ends

GP-1

6. Submission of adequate and complete certified payroll records as required by the Contract Documents for any time period that Project Work was performed, which have not been submitted by Contractor in connection with its previous Applications for Payments.

7. Proper payment of prevailing wages as defined in California Labor Code Section 1720, et seq for the Project Work.

8. Submission of certificates by Contractor and each Subcontractor, as required by any applicable collective bargaining agreement or trust agreement or Applicable Laws, certifying that all employees’ benefits relating to the Project Work due and owing having been paid in full; and

9. Submission of any other documents or information required by the Contract Documents as a condition of Final Payment or Final Completion of the Project Work.

Final Payment Terminates Liability

No claim shall be made or be filed, and neither the City nor any of its officers or agents shall be liable or held to pay any money, except as specifically provided in the Contract Documents.

The acceptance by the Contractor of the final payment aforesaid shall operate as, and shall be, a release to the City and its agents, from all claim and liability to the Contractor for anything done or furnished for, or relating to, the work or for any act or neglect of the City or of any person relating to or affecting the work, except the claim against the City for the remainder, if any there be, of the amounts kept or retained as provided elsewhere in these General Conditions.

Securities in Lieu of Retention

Provisions of California Public Contract Code Section 22300 et. seq. substitution of eligible and equivalent securities for retention held by City to ensure Contractors performance under the Contract will be permitted at the request and expense of the Cont ractor and in conformity with California Section 22300. The foregoing notwithstanding, the Contractor shall have ten (10) days following action by the City to award the Agreement to the Contractor to submit its written request to the City to permit the substitution of securities for retention under California Public Contract Code Section 22300. The failure of such Contractor to make such a written request for the City within said ten (10) day period shall be deemed a waiver of the Contractor’s right under California Public Contract Code Section 22300.

In the event the Contractor wishes to choose to exercise its rights under California Public Contract Code Section 22300, the Contractor shall enter into an escrow agreement with the City, and the escrow agent, a state or federally chartered bank in California with a current A.M. Best Rating of not less than “A,” in the form specified by said Section 22300. Contractor shall have the obligation of ensuring that such securities deposited are sufficient to maintain it total fair market value an amount equal to the cash amount of the sums to be withheld under the Agreement. If upon written notice from the City or from the appropriate escrow agent, indicating that the fair market value of the securities has dropped below the dollar amount of monies to be withheld by the City to ensure performance, Contractor shall, within five (5) days of the date of such notice, post additional securities as necessary to ensure that the total fair market value of all such securities held by the

Page 476 of 751 ends

GP-1
City, or in escrow, is equivalent to the amount of money to be withheld by the City under the Agreement.

Any escrow agreement entered into shall contain the following provisions:

(a) The amount of surety to be deposited;
(b) The terms and conditions of conversion to cash in case of default of the Contractor; and
(c) The termination of the escrow upon completion of the contract.

7.3.3 Delivered Materials.

This subsection of the Standard Specifications is hereby replaced in its entirety by the following:

Materials and equipment delivered but not incorporated into the work will not be included in the estimate for progress partial payment.

7-3.5 Contract Unit Prices.
7-3.5.1 General.

Replace this subsection with the following:

If the Engineer orders a change in quantity of an item of Work, and the change does not involve a substantial change in character of the Work from that shown in the Plans or Specifications, the City will adjust the total payment to be made for the item of Work by multiplying the amount authorized and installed by the Contract Unit Price. This amount may be greater or less than the amount shown in the Bid.

If the total quantity of a Major Bid Item is changed, the quantity changes of the quantity shown in the Bid, either more or less, will be adjusted at the Contract Unit Price.

7-3.5.2 Increases of More than 25 Percent

This subsection of the Standard Specifications is hereby replaced by the following:

No adjustments for any unit bid price for any quantity that will vary by more than 25% will be allowed.

7-3.5.3 Decreases of More than 25 Percent

Th
is subsection of the Standard Specifications is hereby replaced by the following:

No adjustments for any unit bid price for any quantity that will vary by more than 25% will be allowed.

Page 477 of 751 ends

GP-1
7-4 PAYMENT FOR EXTRA WORK.

7-4.3 Markup.

Replace this subsection with the following:

7-4.3.1 Work by Contractor.

The following percentages shall be added to the Contractor's costs and shall constitute the markup for all overhead and profit:

Labor 20%
Materials 15%
Equipment Rentals 15%
Other Contractor's costs 15%

One percent (1%) may also be added to the sum of costs and markups as compensation for the Contractor's bond premium.
7-4.3.2 Work by a Subcontractor.

When a subcontractor performs all or any part of the extra work, the markups in paragraph (a) shall be added to the subcontractor's actual cost of such work. The Contractor may add an additional markup of 10% of the first $5,000 of the subcontracted portion of the extra work and 5% on work added in excess of $5,000 of the subcontracted portion of work.

SECTION 8 – FACILITIES FOR AGENCY PERSONNEL

The following is hereby added to this subsection of the Standard Specifications:

No field offices for AGENCY personnel will be required, however, the AGENCY personnel shall have the right to enter upon the project at all times and shall be admitted to the offices of the Contractor for the project in the City if so, provided by the Contractor for his own personnel.

SECTION 9 – CITY STANDARDS, STANDARD PLANS AND DRAWINGS

Section 9 is hereby added to the Standard Specifications as follows:

All public improvements, construction and dedications required and described in this manual shall conform to the standards and specifications of the City. Standards, Standard Plans and Drawings of the following agencies are used by the City of Montebello and are part of the City’s standards.

Where there is ambiguity or conflict between standards over which standard shall apply, the City Engineer shall determine what shall apply, and his determination shall be final. All construction is subject to the approval of the City Engineer.

Standard Plans – Standard Plans for Public Works Construction, SPPWC, “Latest Edition and Supplement”.

Page 478 of 751 ends

GP-1
Los Angeles County Public Works Department – Grey Book and all plans except those modified or replaced by City Standards.

Los Angeles County Flood Control District - Applicable storm drains.

Sanitation Districts of Los Angeles County - Applicable sewer and manholes.

State of California – California Department of Transportation (Caltrans) Standard Specifications and Standard Plans - Pavement markings and traffic loops.

City Standards - All applicable standard plans.

Standard Specifications - The 2024 edition of, and applicable amendments to, the “Standard Specifications for Public Works Construction (SSPWC).”

California Manual on Traffic Control Devices (CA-MUTCD), “Latest Edition”.

SECTION 10 – CLAIMS AND PROTESTS

Section 10 is hereby added to the Standard Specifications as follows:

Excerpts from the Public Contract Code 9204.

(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Claim” means a “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3)(A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter

Page 479 of 751 ends

GP-1
county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department.
(iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
(v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d)(1)(A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) A
ny payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2)(A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute.

Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.

Page 480 of 751 ends

GP-1
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neu tral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation.

Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.
(4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
(e) T
he text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section.

Page 481 of 751 ends

GP-1
(f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil ac tion or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.

PART 4 – EXISTING IMPROVEMENTS
SECTION 400 – PROTECTION AND RESTORATION
400-1 GENERAL.

The second paragraph of Subsection 400- 1 of the Standard Specifications is hereby deleted and replaced with the following:

The Contractor shall relocate, repair, replace or re -establish all existing improvements within the project limits which are not designated for removal (e.g., curbs, sidewalks, driveways, fences, walls, sprinkler systems, signs, utility installations, pavements, structures, etc.) which are damaged or removed as a result of the operations or as required by the Plans and Specifications. The Contractor shall make the effort to repair all sprinklers, pipe, etc by the end of the day.

Where existing traffic striping, pavement markings, and curb markings are damaged or their reflectivity reduced by the Contractor’s operations, such striping or markings shall also be considered as existing improvements and the Contractor shall repaint or replace such improvements.

Relocations, repairs, replacements or re- establishments shall be at least equal to the existing improvements and shall match such improvements in finish and dimensions unless otherwise specified.

All existing improvements including Fence/Wall/Gates/Plants/Grass/Trees/Irrigation Systems/etc. that might be damaged during construction should be videotaped and it is Contractor’s responsibility to protect all existing adjacent features such as landscaping, irrigation system, property’s fence/wall/gates, curb and gutter, pull boxes, utility boxes, and etc. in place per section 400-1 of Standard Specifications for Public Works Construction. All damages to these items shall be fixed to the satisfaction of the City of Montebello without any additional compensation.

400-2 PERMANENT SURVEY MARKERS.

The following is added this this subsection of the Standard Specifications:

The Contractor shall be responsible for the protection and preservation of existing permanent survey monuments and benchmarks during construction. Damaged or lost monuments and benchmarks shall be restored to existing condition by a Registered Civil Engineer or a Land Surveyor licensed by the State of California at no increase in cost to the City.

Page 482 of 751 ends

GP-1
The Contractor, at its own expense, shall employ a qualified surveyor to perform all survey work required for the completion of the project as specified in the plans and these specifications, comply with the requirements of Section 8771 of the Land Surveyors Act as amended and submit the documents from the County Surveyor as proof of compliance to the City of Montebello.

400-3 PAYMENT
This subsection of the Standard Specifications is hereby deleted and replaced with the following:

No separate or additional payment will be made for 1) protection of existing improvements, 2) restoration of existing improvements and 3) permanent survey markers. All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or re -establishing existing improvements shall be included in the bid.

SECTION 402 – UTILITIES

402-1 LOCATION.

402-1.1 General.

The following is hereby added to this subsection of the Standard Specifications:

The location and existence of any underground utility or substructure was obtained from a search of available records. No guarantee is made or implied that the information is complete or accurate.

It shall be the Contractor’s responsibility alone to determine the exact location of underground utilities or substructures of every nature and to protect them from damage. The Contractor shall excavate and expose all high -risk underground facilities. The Contractor shall notify the owners of all known utilities and substructures as set forth in the Specifications.

NOTIFICATION

The Contractor shall notify the City of Montebello and the owners of all utilities and substructures not less than 48 hours (2 working days) prior to starting construction. The following list of names and telephone numbers is intended for the convenience of the Contractor and is not guaranteed to be complete or correct:

CITY OF MONTEBELLO DEPT OF PUBLIC WORKS (323) 887- 1462 Attention: Mr. Cesar Roldan [email protected]

AT&T (626) 318-9039
Attention: Mr. Marco Macias
CALIFORNIA WATER SERVICE (323) 823-5287
Attention: Mr. Ralph Felix [email protected]

CENTRAL BASIN MUNICIPAL WATER DISTRICT (323) 201- 5500
Attention: Mr. Kevin P. Hunt

Page 483 of 751 ends

GP-1
CHARTER COMMUNICATION (626) 807-3263
Attention: Mr. Rodney Graf [email protected]

LOS ANGELES COUNTY DEPT. OF PUBLIC WORKS (626) 458- 7136 Attention: Mr. Mahdad Derakhshani [email protected]

LOS ANGELES COUNTY SANITATION DISTRICT (562) 908-4288 ext. 1205 Attention: Ms. Christine Gurga [email protected] METROPOLITAN WATER DISTRICT (909) 242-1675
Attention: Mr. Ben Brinker [email protected]
MONTEBELLO LAND & WATER (323) 722-8654
Attention: Mr. Mario Gardea [email protected]

SAN GABRIEL VALLEY WATER CO. (909) 201-7349
Attention: Mr. Paul Garavito

SOUTH MONTEBELLO IRRIGATION DISTRICT (323) 721-4735
Attention: Mr. Jordan Betencourt [email protected]

SOUTHERN CALIFORNIA EDISON North of Lincoln Av (323) 720- 5298 Attention: Ms. Regina Gonzales

SOUTHERN CALIFORNIA EDISON North of Lincoln Ave. & Large Projects Attention: Ms. Elda Alatorre (323) 720-5214
SOUTHERN CALIFORNIA EDISON South of Lincoln Ave. (310) 608- 5005 Attention: Ms. Lissette Alvarez [email protected]

THE GAS COMPANY (310) 605-4105
Attention: Mr. Cesar Arroyo [email protected]

CRMSON PIPELINE (310) 669-4002
Attention: Mr. Ryan Lassus (310) 669-4024

CHEVRON (310) 669-4014
Attention: Mr. Dave Zerler

CITY POLICE AND FIRE DEPARTMENT Police: (323) 887-1313
Fire: (323) 887-4510

UNDERGROUND SERVICE ALERT (800) 422-4133 Tel
(909) 808-8101 Fax

TRASH COLLECTORS – ATHENS DISPOSAL (626) 336-6100

STREET SWEEPING – NATIONWIDE (562) 860-0604

Page 484 of 751 ends

GP-1
MONTEBELLO UNIFIED SCHOOL DISTRICT (323) 887-7900

MONTEBELLO TRANSIT (323) 558-1625

EMERGENCY INFORMATION
The names addresses and telephone numbers of the Contractor and subcontractors, or their representatives, shall be filed with the Engineer and the City Police Department prior to beginning work.
402-1.2 Payment
Payment for provisions under section 402-1 of the Standard Specifications shall be considered included in the various items of the work. No separate payment will be authorized.

PART 6 – TEMPORARY TRAFFIC CONTROL

SECTION 600 – ACCESS

600-1 GENERAL.

The following is added this this subsection of the Standard Specifications:

The Contractor shall notify the occupants of all affected properties in writing at least forty-eight hours (2 working days) prior to any temporary obstruction of access. 600-2 VEHICULAR ACCESS.

The following is added this this subsection of the Standard Specifications:

Vehicular access to the property line shall be maintained except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed except as permitted by the Engineer.

In cases where driveways require replacement. Where a property has two driveways, only one driveway at a time can be closed for replacement. Where a single driveway to a property has a considerable width, half of the driveway is to be closed, worked on and reopened for usage before the other half of the driveway can be worked on.

All driveways have to be open for access during project non -construction hours and days which may require use of plating and other devices or methods.

No driveway can be worked on until the owner/tenant has been informed in writing with five (5) working days’ notice of the scheduled work and has agreed to the planned schedule of the Contractor.

600-3 PEDESTRIAN ACCESS.

The following is added this this subsection of the Standard Specifications:

Page 485 of 751 ends

GP-1
Under situations of sidewalk closure to pedestrians, the Contractor shall post advance notice on barricades to direct pedestrian to use the sidewalk on the opposite side of the street or the Contractor may elect to provide continuous K-rail in the curb lane to allow pedestrians to walk in the curb lane behind the K-rail. Any and all devices such as plates, barricades, K-rails and notices shall be continuously maintained for pedestrian and vehicle safety. No curb lanes shall be closed during non-working days of the week. Appropriate advance warning signs shall be continuously maintained as needed during the project. All such devices, warning signs and interruptions of normal vehicle lanes, parking lanes and pedestrian walkways shall be shown on the Traffic Control Plan for advance approval by the Agency.

SECTION 601 – TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION AND

MAINTENANCE WORK ZONES

601-1 GENERAL.

The following is added this this subsection of the Standard Specifications:

At least one twelve -foot-wide traffic lane shall be provided for each direction of travel on all arterial streets at all times except as permitted by the Engineer. With previous authorization from the City, the Contractor can provide one traffic lane on a single direction on residential streets, during construction hours.

Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.

Any striped roadway shall be delineated by the Contractor with temporary raised reflective markers when it is to be left un-striped overnight.

Street closures will not be allowed except as specifically permitted by the Engineer.

601-2 TEMPORARY TRAFFIC CONTROL PLAN (TCP)

601-2.1 General

The following is added this this subsection of the Standard Specifications:

At the Pre -Construction meeting, the Contractor shall submit to the Engineer a detailed traffic control plan per section 601 of the Standard Specifications and construction sequencing for the project. The plan shall include drawings as necessary to clearly outline how traffic flow and pedestrian walkways will be handled during the course of construction and where detour and advance notice signs will be posted.

Traffic control plan shall be approved in writing by the City Engineer prior to construction starts.

The plan shall be prepared per latest edition of California Manual on Traffic Control Devices (CA-MUTCD).

Traffic lane transitions shall not be sharper than a taper of thirty to one.

Page 486 of 751 ends

GP-1
Temporary striping will not be allowed unless specifically permitted by the Engineer. The Contractor shall prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed to remain on finish pavement surfaces.

In no case shall traffic be diverted from the existing traveled way without prior approval of the City Engineer.

The contractor shall include in his Traffic Control Plan use of lighted message boards to notify traffic of project and any changes in vehicle or pedestrian travel routes.

If the Contractor shall fail to provide and install any of the signs or traffic control devices ordered by the Engineer, the Engineer may either stop the work or cause such signs or traffic control devices to be placed by others and charge the cost therefor against the Contractor and deduct same from the next progress payment.

601-2.2 Payment

Payment for provisions under section 601 of the Standard Specifications shall be considered included under the bid item for traffic control. No separate payment will be authorized.

Page 487 of 751 ends

BD-1

SPECIAL PROVISION
PART 9 – BID ITEM DESCRIPTIONS

FOR
FY 2025-2026 SB1 RUBBERIZED ASPHALT STREET ENHANCEMENT PROJECT C.P. No. 944

IN THE CITY OF MONTEBELLO
All Bid Items shall be in accordance with the Standard Specifications for Public Works Construction (SSPWC), including supplements, State of California Department of Transportation (Caltrans) Standard Specifications, Latest Edition, and the Special Provisions and General Conditions of these specifications.

Bid Item No. 1 – Mobilization/Demobilization (Not to exceed 3% of total of all other Prime Contract Bid Items)

Mobilization shall conform to the provisions of Sections 7-3.4 of the Standard Specifications.

Mobilization and demobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, materials, and incidentals to and from the project site necessary for work on the project and for all other work and operations which must be performed or costs incurred including bonds, insurance, and financing prior to beginning work on the various contract items on the project site. Mobilization shall also include the time, materials, an d labor to move the necessary construction equipment to and from the site, supervisory time on the job by the Contractor’s personnel to keep the construction site in a safe condition, and all other related work as required at all times and for all non-working days during the construction period. The Contractor is responsible for securing an adequate storage site for equipment and materials. Demobilization includes removal of all equipment and materials from the site, clean up and restoration of the work site at the end of project. This bid item shall also include pressure washing of all USA markings, clearing and grubbing operations preceding and post construction consisting of removing all natural and artificial objectionable materials from the Right-of- Way in construction areas, r oad approaches and material sites. Clearing and grubbing shall conform to the provision of section 300-1 of the standard specifications.

No additional amounts shall be paid for erosion control, Best Management Practices (BMP), erosion damage clean -up, and removal of debris from the project site, NPDES requirements, or removal of soil and other materials deposited on public streets by construction traffic.

Best Management Practices (BMP) shall be defined as any program, technology, process, citing criteria, operating method, measure, or device, which controls, prevents, removes, or reduces pollution. The Contractor shall obtain and refer to the California Storm Water Best Management Practice Handbooks, Volume 3, Construction BMP Handbook and the Los Angeles County Department of Public Works Best Management Practices Handbook for Construction Activities.

Page 488 of 751 ends

BD-2
Los Angeles County Department of Public Works
Cashier’s Office
900 South Fremont Avenue
Alhambra, CA 91803
Telephone: 626-458- 6959
The Contractor shall have a minimum of two readily accessible copies of each publication on the Contract site at all times plus any copies of applicable environmental mitigation plans.

Additional BMPs may be required as a result of a change in actual field conditions, contractor activities, or construction operation. When more than one BMP is listed under each specific BMP category, the Contractor shall select the appropriate and necessary number of BMPs within each category in order to achieve the BMP objective.

BMPs for Contractor activities shall be continuously implemented throughout the year and project time period. BMPs for erosion control and sedimentation shall be implemented during the period from October 15 to April 15, and whenever the National Weather Service Predicts rain within 24 hours. BMPs for erosion control and sedimentation shall also be implemented prior to the commencement of any Contractor activity or construction operation, which may produce run-off, and whenever run-off from other sources may occur.

The Agency (City), as a permittee thereto, is subject to enforcement actions by the State Water Resources Control Board, Environmental Protection Agency, and private citizens. The Agency will pass through to the Contractor any penalty assessed by these entities for each calendar day that the Contractor has not fully implemented the BMPs specified for the Contract and/or is otherwise in noncompliance with these provisions. In addition, the Agency will deduct, from the final payment due the Contractor, the total amount of any fines levied on the Agency, plus legal and staff costs, as a result of the Contractor’s lack of compliance with these provisions and/or less than complete implementation of the specified BMPs.

Payment for Mobilization/Demobilization shall be included in the Lump Sum (LS) Price bid and shall be considered full compensation for obtaining all business licenses and permits, as required for the entire project, from all related agencies, including, but not limited to, utility companies, private and public agencies and the City of Montebello; and complying with the requirements specified in those licenses and permits; coordination, field office facility, implementation of Best Management Practices, and incidentals necessary to perform all related items of work. Progress payments for this bid item shall be paid for in accordance with the completion percentage of the project to the Contractor and shall include the cost of such mobilization administration during the entire contract period and demobilization. No additional compensation will be allowed therefor. The sum total of this Bid Item shall not exceed 3% of the total of all other Bid Items.

Bid Item No. 2 – Traffic Control

Traffic Control, Traffic Control plan, construction signing and traffic maintenance shall comply with the provisions of Subsections 5-7, 600 and 601 of the Standard Specification, Subsection 56- 2 of the Caltrans Standard Specifications, and the current requirements set forth in the “Manual of

Page 489 of 751 ends

BD-3
Traffic Controls for Construction and Maintenance Work Zones” published by the Department of Transportation, State of California, and Manual on Uniform Traffic Control Devices (CA - MUTCD), Latest Edition, by the Federal Highway Administration and California, the traffic control plans and these Special Provisions.

The Contractor shall maintain the following clearances from the edge of traffic lanes:
1) 5 feet to any excavation,
2) 2 feet to curbs or temporary concrete barriers,
3) 10 feet to poles and other obstructions on uncurbed roadways.

If determined by the Engineer that it is necessary to decrease these minimum distances to allow for the prosecution of the work, the Contractor shall provide all protective devices required by the Engineer to adequately protect the public.

PUBLIC CONVENIENCE

Within ten working days after the date of the Agency’s execution of the Contract Agreement the Contractor shall submit a proposed Construction Schedule for approval. Based on the approved project schedule, the Contractor shall notify residents and businesses of the proposed work and post temporary “NO PARKING” signs at no cost to the City. Signs shall be posted at all intersections, and on each side of the street a maximum of 200 feet between signs. Signs may not be attached to existing poles, street lights standards or trees. All signs must be posted on delineators or stakes provided by the Contractor. The “NO PARKING” signs shall be in place not less than seventy two (72) hours prior to performing the work; therefore a request for changes in the schedule requiring additional posting shall be submitted by the Contractor for approval by the Engineer at least seventy -two (72) hours prior to reconstruction and paving the street. All conflicting parking signage shall be covered.

Due to the nature of this project involving major inconvenience to residents and businesses, a good Public Relations Program is mandatory and evidence of satisfactory past performance in this area will be required.

The Contractor is to distribute two (2) “Public Notice” to each residence and business affected by the project. The first notice shall be distributed ten (10) calendar days prior to the start of any work. The second notice shall be distributed at least seventy two (72) hours prior to the start of work on a specific section of the street. A sample copy of the notice must be approved by the City. Said notice shall be attached to a red information hanger provided by the Contractor and hung on the gate or front door knob. The Contractor shall also coordinate with the bus services to ensure the safe operation of buses and access to bus stops in the construction area. Notices shall be in English and Spanish languages.

The Contractor shall also coordinate with the street sweeping, trash disposal, Montebello Bus Lines and postal services agencies to ensure the safe operation of their vehicle and access in the construction area.

Page 490 of 751 ends

BD-4
All complaints received by the City associated with the construction project alleging damage to private property and vehicles shall be responded to by the Contractor within twenty-four (24) hours (one working day) of notification. Failure to comply with this provision may result in a penalty of One Hundred dollars ($100.00) per occurrence.

All trucks, which the Contractor proposes to use, that exceed the legal load limit when loaded will be required to have overweight permits issued by the City.

The Contractor shall be responsible for adequate barricading of the work area and controlling of traffic in the vicinity of the project as specified in Subsection 601 of the General Provisions.

PROTECTION OF WORK AND PUBLIC
The Contractor shall take all necessary measures to protect work and prevent accidents during any and all phases of the work. The Contractor shall repair all damaged pavement as a result of vandalism (i.e., vehicle tracks, footprints, graffiti, etc.) If deemed necessary by the City, the Contractor shall repair the defective area in accordance with these special provisions.

CONSTRUCTION SIGNING

Construction signing shall consist of furnishing, installing, maintaining and removing construction signs and barricades as required by the “California Manual on Uniform Traffic Control Devices”, CA-MUTCD. The traffic control system shall be installed on a road prior to starting work for that road and shall not be removed until all work has been completed on that road. Existing speed limit signs, which conflict with the work zone speed limit, shall be covered during the entire construction period. Contractor shall include in his bid the cost of installing electronic message boards as requested by the traffic manual and the City, the City’s request shall override the traffic manual requirement for electronic message boards.

TRAFFIC MAINTENANCE

The Contractor shall be responsible for handling vehicular and pedestrian traffic in accordance with Subsection 601 of the Standard Specifications and these Special Provisions.

The Contractor shall prepare all necessary traffic control plans and submit to the City for approval at the pre- construction meeting. The traffic control plans shall be prepared by a California Licensed Traffic Engineer and shall show:

1. Notification Signs.

2. Existing and temporary lane lines.

3. Dimensions of the work zone and street improvements.

4. Advance warning signs.

5. Delineators

6. Lighting, for nighttime work.

The plans shall be submitted to the City at the preconstruction meeting prior to commencing work and shall incorporate a complete and separate plan for each stage of construction proposed by the Contractor.

This plan shall indicate the sequence of lanes or portions of lanes being closed for

Page 491 of 751 ends

BD-5
each phase. The traffic control plans shall indicate the travel plan for each phase of construction.

The traffic control plans shall state:

1. That the plan will conform to “California Manual on Uniform Traffic Control Devices”, CA-MUTCD.

2. Emergency contact person and phone number.

3. Minimum lane widths and minimum clearance to obstructions.

The traffic control plan shall be approved by the City of Montebello prior to beginning any removals.

The Contractor shall cooperate with the City of Montebello relative to handling traffic through all work areas and shall make his own arrangements relative to keeping the working area clear of parked vehicles and maintaining clear access to driveways.

The Contractor shall furnish and install construction notification signs as shown on traffic control plans and as specified by the City of Montebello.

The Contractor shall provide for controlled pedestrian crossings through the work. Crossings shall provide pedestrians a means of passing over or through the work without tracking tack coat or hot asphalt concrete or P.C.C. work or endangering pedestrian safety. All temporary pedestrian crossings shall be in compliance with the latest Americans with Disabilities Act design standards and supplements.

At intersections, if a cross road needs to be temporarily closed when work is in progress through the intersection and the anticipated traffic delay is more than five (5) minutes, a detour sign shall be installed on the cross street and shall include the installation of advance signing displaying the anticipated delay time. The signing of the detour route shall be approved by the Engineer prior to installation of the detour and closure of the road.

The Contractor shall provide for one lane of travel in each direction at all times unless approved by the Engineer. When two -way traffic is restricted to one lane in each direction, and when applying paving past intersecting roads, traffic shall be controlled as required by the “California Manual on Uniform Traffic Control Devices”, CA -MUTCD. A pilot car and driver will be required at various locations if control by flaggers and/or control devices proves deficient in the opinion of the Engineer. In no case shall the Contractor provide less than one (1) lane of travel in each direction through the construction zone including cross-streets.

Contractor’s equipment and personal vehicles of the Contractor’s employees shall not be parked on the traveled way at any time. Overnight parking of construction equipment shall be confined to an approved storage site selected by the Contractor and approved by the City.

TEMPORARY G

UIDE MARKERS

Temporary guide markers shall be portable Caltrans Standard Specifications approved delineators.

Only one type of temporary guide marker shall be used on any road at any one time.

Page 492 of 751 ends

BD-6
Temporary guide markers shall be placed adjacent to the edge of all vertical lips or excavations that exceed 3/4 inches. If the temporary guide markers are damaged, or are not in an up- right position, from any cause, said markers should immediately be replaced or restored to their original locations, in an upright position by the Contractor.

PORTABLE DELINEATORS
The vertical portion of the portable delineators shall be brilliant orange or predominantly orange in color. The posts shall be not less than 100 square inches, measured through the vertical axis of the delineator, normal to the roadway. The minimum height shall be thirty-seven (37) inches above the traveled way.

Two 4-inch nominal width reflective bands shall be mounted a minimum of 1 ½ inches apart and at a height on the post so that one reflective band will be between 2.5 feet and 3 feet above the roadway surface.

Reflective bands shall be flexible vinyl plastic, either white or yellow, and shall have not less than the following dry reflective values at a 0.2 degree divergence angle, expressed I units if candlepower per foot-candle per square foot. The wet reflective values shall not be less than ninety percent (90%) of the dry values.

Dry Reflective Value

Angle of Incidence 4º 5º 30º
White 250 165 50
Yellow 10 110 50

All tests for reflective values shall be performed in accordance with California Test Method No. 642.

The portable delineators shall be spaced as necessary for proper delineation; however, in no case shall the spacing between portable delineators exceed thirty (30) feet on tangents or twenty (20) feet on curves.

FLUORESCENT TRAFFIC CONES

Provide lighted flashers and lighting for night time. Traffic cones shall be fluorescent new or reconditioned and of good commercial quality, flexible material suitable for the purpose intended.

The outer section of the portion above the base of the once shall be highly pigmented fluorescent orange polyvinyl compound. The overall height of the cone shall be anchored in a manner such that the traffic cone will remain in an upright position. Lighted flashers and lighting shall be provided additionally for nighttime.

The fluorescent traffic cones shall be spaced as necessary for proper delineation; however, in no case shall the spacing between fluorescent cones exceed thirty (30) feet on tangents or twenty (20) feet on curves.

Page 493 of 751 ends

BD-7

STRIPING

Temporary striping and marking which has no further use shall be removed by wet sandblasting, and all sand used in sandblasting shall be removed without delay as the sandblasting operation progresses.

RESTRICTIONS ON CLOSURE OF STREETS AND TRAFFIC LANES
The Contractor shall conduct all operations so as to provide access to the adjoining properties and have no greater length or quantity of work under construction that can be properly prosecuted with a minimum of inconvenience to the public.

The Contractor shall construct temporary A.C. ramps or equal to provide safe and drivable access to residents and business properties daily.

The Contractor shall coordinate all shipments and deliveries to businesses. If steel plates are required, they shall be provided by the Contractor at no additional cost to the City.

The Contractor shall be responsible for furnishing, placing and maintaining barricades and lights as necessary to protect the public from danger due to the work being done.

No additional amounts shall be paid for erosion control, erosion damage clean-up, and removal of debris from the project site, NPDES requirements, or removal of soil deposited on public streets by construction traffic.

Payment for Traffic Control shall be included in the Lump Sum (LS) Price bid and shall be considered full compensation for providing and maintaining safe traffic control including all temporary signs, striping and delineation, preparing and providing traffic control plan during the project, obtaining all approvals and permits, as required, from all related agencies, including, but not limited to, public agencies and the City of Montebello; and complying with the requirements specified in those licenses and permits, coordination, field office facility; and incidentals necessary to perform all related items of work.

Bid Item No. 3 – Cold Mill Existing AC Pavement 2” Depth

The following is applicable for all cold milling. Cold milling shall conform to the provisions of Section 404 of the Standard Specifications for Public Works Construction. The Contractor shall cold mill existing asphalt concrete (AC) pavement to the depth required for the placement of new pavement as shown on the Plans and as directed in the field by the Engineer. All work shall be completed in accordance with lines and grades, and typical cross-sections shown on the drawings.

Any extra cold milling beyond the shown limits shall be at the Contractor’s expense.

All existing asphalt concrete (AC) pavement to join new construction shall be sawcut in a straight line. Contractor shall exercise due caution to avoid any damage to existing improvements,

Page 494 of 751 ends

BD-8
protecting in -place of existing water mains, sewers, storm drains, meters, valve covers, wall, fences, curbs, fire hydrants, telephone and power poles, and other existing structures.

It is the Contractor’s responsibility to perform whatever additional exploration is necessary to avoid causing any damage to the existing utilities under the work area. Any damage done by the Contractor shall be repaired or replace as called out in Section 400 of the Standard Specifications for Public Works Construction at the Contractor’s expense.

This work shall consist of cutting existing asphalt concrete (AC) pavement to facilitate its removal.

Any sawcutting shall be accomplished by the use of a power-driven saw to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until surface course AC is constructed. Under this item, the use of a grinder will not be allowed in lieu of power-driven saw.

During the cold milling operation, the Contractor shall remove all loosened materials from milled areas, haul away and dispose of them at a legal site and submit evidence of the proper disposal to the City of Montebello. The Contractor shall abate dust nuisance by cleaning, sweeping, and sprinkling with recycled water (if available) or other means as necessary.

Any petromat found during grinding shall be removed by scraping and by burning it with a torch.

The Contractor shall be responsible to assume the cost of removing, hauling, recycling and any other incidental of any petromat/fabric found during grinding operation and no adjustment on the Bid price shall be made. Also, the Contractor shall remove all asphalt residuals along existing gutter.

Crack Sealing (Not a Bid item)

After the completion of the cold milling operation, ¼” wide cracks and larger shall be cleaned by hot air blowing to provide intact bonding surfaces which are free of moisture and debris. After the cracks have been properly cleaned, they shall be sprayed with an approved soil sterilant, and then filled with SS-1H asphaltic emulsion and sanded. Cracks and pop-outs larger than 1” wide shall be sealed with a D2-SC-800 stockpile mix.

Payment for Cold Milling of Existing Asphalt Concrete (AC) Pavement shall be paid for at the price bid per Square Foot (SF) and shall be considered full compensation for furnishing labor, materials, equipment, sawcutting, removals, hauling and disposal of asphalt concrete materials excavated or grinded, grade for the base, crack sealing, compaction and no additional compensation will be allowed therefore. Payment for the removal of Petromat fabric material shall be included in this bid item of work and no additional compensation will be allowed.

Page 495 of 751 ends

BD-9
Bid Item No. 4 – Remove and Reconstruct Existing AC Speed Hump

Construction of new speed humps shall proceed only after installation of all advance warning regulatory posted signs and pavement markings and flags-Contractor to order and provide post signs and flags ,and Contractor shall install the thermoplastic pavement markings shown on the plans and standard drawing

This Bid Item shall include all labor, material and equipment required to sawcut, remove, haul away, properly dispose of existing AC pavement speed hump and to construct asphalt concrete Speed Hump for the project. On streets where new humps are to be installed , Contractor shall furnish and install all required posted signs, pavement markings, and flags , according to City regulations, prior to hump installation. Contractor shall not remove existing signs unless new signs are in the possession of the Contractor and he can proceed with the hump installation. All signs shall conform to MUTCD latest edition.

Contractor to submit to the City for approval all shop drawings and material specifications of all signs and posts related to this project, prior to placing an order.

Removal of AC and underlying materials as shown the Contract Drawings shall conform to Subsection 401- 2 of the Standard Specifications for Public Works Construction.

Sawcutting shall be accomplished by the use of a power-driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until new pavement is constructed.

All necessary sawcutting of AC or any underlying existing improvements shall be to the lines as shown on plans or as directed by the City Engineer. Sawcutting shall be included in the unit price and no further compensation shall be made.

Asphalt Concrete Speed Hump shall conform to the provisions of Sections 203-11 and 302-9 of the Standard Specifications for Public Works Construction. ARHM asphalt concrete for speed hump shall be Type C2-PG 64-16 and per Asphalt Concrete section of this Specification.

Asphalt Concrete Speed Hump shall be constructed at the specified location on the plans and confirmed with the engineer prior to placement and shall be same dimensions and height and to the line, grades and design shown on the plans or as ordered by the Engineer. Contractor shall cold mill existing AC Surface to a minimum of 1.5” for correct binding of AC Speed Hump. Tack coat shall be Grade SS-1H, per Section 302-5.8 and shall be applied to the perimeter of all AC removal and replacement locations and cold milling locations. (All tack coat overspray on gutter lip shall be removed.)
Payment for Remove and Construct AC Speed Hump shall be at the contract unit price per Each (EA) and shall be considered full compensation for complying with the above requirements. Furnishing of labor, materials, equipment, sawcutting, removal, excavation, hauling, properly disposing, protection of facilities, grading, sub-grade compaction, restoration and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

Bid Item No. 5 –
Construct 2”-ARHM Overlay

Page 496 of 751 ends

BD-10
Asphalt concrete surface course shall be Asphalt Rubber Hot Mix as shown on the plans, ARHM- GG-C, wet process, as specified in Section 203 -11 and 302-9 of the Standard Specifications for Public Works Construction and shall conform to the following:

Composition and Grading shall be per Section 203-11.3 of the Standard Specifications for Public Works Construction. The Contractor shall submit a copy of the asphalt concrete mix design, a sample of the asphalt concrete, a sample of the aggregate, and a sample of the paving asphalt (AR or PG) to the City or its designated laboratory a minimum of two weeks prior to the start of construction.

The Contractor shall use a PG Asphalt Binder.

PG Asphalt binder shall conform to the following requirements:

1. Description

Asphalt shall consist of refined petroleum or a mixture of refined liquid asphalt and refined solid asphalt, prepared from crude petroleum. Asphalt shall be:

A. Free from residues caused by the artificial distillation of coal, coal tar, or paraffin.

B. Free from water.

C. Homogeneous.

2. Materials
A. General

The Contractor shall furnish asphalt in conformance with the State of California Department of Transportation (Caltrans) “Certification Program for Suppliers of Asphalt.” Caltrans maintains the program requirements, procedures, and a list of approved suppliers at: http://www.dot.ca.gov/hq/esc/Translab/fpmcoc.htm.

The Contractor shall ensure the safe transportation, storage, use, and disposal of asphalt.

The Contractor shall prevent the formation of carbonized particles caused by overheating asphalt during manufacturing or construction.

B. Grades
Performance graded (PG) asphalt binder shall be PG 64-16 and conform to the following:

Page 497 of 751 ends

BD-11
Performance Graded Asphalt Binder

Property

AASHTO
Test
Method
Specification
Grade
PG
58-22 a
PG
64-10
PG
64-16
PG
64-28
PG
70-10
Original Binder
Flash Point, Minimum ºC T48 230 230 230 230 230
Solubility, Minimum % b T44 99 99 99 99 99
Viscosity at 135ºC, c
Maximum, Pa’s
T316

3.0 3.0

3.0 3.0

3.0 Dynamic Shear,
Test Temp. at 10 rad/s, ºC
Minimum G*/sin(delta),
kPa
T315
58 1.00

64 1.00

64 1.00

64 1.00

70 1.00
RTFO Test e,
Mass Loss, Maximum, %
T240

1.00 1.00

1.00 1.00

1.00 RTFO Test Aged Binder
Dynamic Shear,
Test Temp. at 10 rad/s, ºC
Minimum G*/sin(delta),
kPa
T315
58 2.20

64 2.20

64 2.20

64 2.20

70 2.20
Ductility at 25ºC
Minimum, cm
T51
75 75

75 75

75 PAV f Aging,
Temperature, ºC
R28
100

100

100

100

100
RTFO Test and PAV Aged Binder
Dynamic Shear,
Test Temp. at 10 rad/s, ºC
Minimum G*sin(delta),
kPa
T315
22 d
5000

31 d
5000

28 d
5000

22 d
5000

34 d
5000
Creep Stiffness,
Test Temperature, ºC
Maximum S-value, MPa
Minimum M-value
T313
-12
300

0.300

0 300

0.300

-6
300

0.300

-18
300

0.300

0 300

0.300

Notes:
a. Recommended as asphalt rubber base stock for high mountain and high desert area. b. The Engineer will waive this specification if the supplier is a Quality Supplier as defined by the Caltrans’ “Certification Program for Suppliers of Asphalt.” c. The Engineer will waive this specification if the supplier certifies the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards. d. The Department will test the sample at 3ºC higher if it fails at the specified test temperature.

G*sin(delta) shall remain 5000 kPa maximum.
e. “RTFO Test” means the asphaltic residue obtained using the Rolling Thin Film Oven Test, AASHTO Test Method T240 or ASTM Designation: D 2827.

Page 498 of 751 ends

BD-12
f. “PAV” means Pressurized Aging Vessel.

C. Sampling

The Contractor shall provide a sampling device in the asphalt feed line connecting the plant storage tanks to the asphalt weighing system or spray bar. The sampling device shall be accessible between 600 and 750 mm above the platform. The Contractor shall provide a receptacle for flushing the sampling device.

The sampling device shall include a valve:
1) With a diameter between 10 and 20 mm.
2) Manufactured in a manner that a one-liter sample may be taken slowly at any time during plant operations.

3) Maintained in good condition.

The Contractor shall replace failed valves.

In the presence of the Engineer, the Contractor shall take 2 one -liter samples per operating day. The Contractor shall provide round friction top containers with one - liter capacity for storing samples.

D. Applying Asphalt

Unless otherwise specified, the Contractor shall heat and apply asphalt in conformance with the provisions in Caltrans Standard Specifications Section 93, “Liquid Asphalts.” The Contractor shall apply paving asphalt at a temperature between 120º and 190ºC. The Engineer will determine the exact temperature of paving asphalt.

The Contractor shall make modifications to the proposed mix design as required by the City or its designated laboratory to insure that the proposed asphalt concrete mix will meet the minimum stability ("S") values. No asphalt concrete shall be placed until such time as the City has tested and approved the Contractor's proposed asphalt concrete mix design.

Aggregate produced from slag resulting from any steel-making process or from air-cooled iron blast furnace slag shall not be used on this project.

Asphalt concrete shall be placed with paving machine equipped with a “Preco” attachment or similar device for use in obtaining constant cross-slope and maximum joint quality.

The Contractor shall place the ARHM a maximum of 48 hours after the commencement of all edge grinding operations during any stage of the work for this project.

Apply SS-1H tack coat at a rate not to exceed one- tenth (1/10) gallon per square yard uniformly in one coat on all vertical joins of AC patching and P.C.C. surfaces and edges against which ARHM is to be placed. Diesel fuel shall not be used for cleaning purposed within the limits of this project.

Page 499 of 751 ends

BD-13
Distribution and spreading shall conform to 302-5.5 except that at the time of delivery to the work site, the temperature of the ARHM -GG shall be 300°F minimum to 325°F maximum. At the discretion of the Owner’s Representative, this maximum temperature may be raised to 350°F during cold climatic conditions. Atmospheric temperature shall be 50°F and rising or as approved by the agency’s representative.

The Contractor shall utilize a paving machine equipped with an automatic adjusting screed, which is actuated by a 30-foot "ski", for the entire ARHM-GG overlay.

ARHM-GG shall not be placed in lifts that exceed four (4) inches in thickness. Breakdown compaction shall be performed with a two -axle or three -axle tandem or three -wheel roller weighing not less than 12 tons for all ARHM -GG lift thickness of four (4) inches or less.

Breakdown compaction shall be performed with a vibratory roller weighing not less than 12 tons for all ARHM-GG lift thickness between two (2) and four (4) inches. When more than one layer of ARHM-GG is required, the layers shall be of equal thickness.

ARHM-GG shall be thoroughly compacted by rolling. The number of rollers necessary will be established in accordance with Section 302-5.6.1 of the Greenbook Specifications. All compacted ARHM-GG shall have a relative compaction of not less than 95 percent in accordance with Section 302-5.6.2 of the Greenbook Specifications.

Rolling along a joint shall be such that the widest part of the roller is on the hot side of the joint.

Join lines between successive runs shall be within 6 inches of lane lines or a minimum of 12 feet outside of the outer most lane line.

Lots consisting of 500 tons will be established for ARHM -GG areas to be tested. The City or its designated laboratory shall perform density testing utilizing a properly calibrated nuclear asphalt- testing device. The City shall pay for all initial testing and a reasonable amount of retesting utilizing the nuclear asphalt -testing device. If the test results for any lot of ARHM -GG indicate that the relative compaction is below 95 percent the Contractor will be advised that he is not attaining the required rel ative compaction and that his materials or his procedures, or both, need adjustment. ARHM-GG spreading operations shall not continue until the Contractor has notified the Engineer of the adjustment that will be made in order to meet the required compaction. Core testing of areas not meeting the 95 percent requirement will be conducted by the City's designated lab. Any and all testing beyond the initial core testing will be at the sole expense of the Contractor.

If the test results for any lot of ARHM-GG continue to indicate that the relative compaction is less than 95 percent after adjustments have been made, the ARHM-GG represented by that lot may be required to be removed and replaced at the Contractor's expense and the Contractor shall suspend all further paving operations until the Contractor can demonstrate to the City that relative compactions of 95 percent can be obtained.

T
he City’s designated laboratory will obtain samples of the ARHM-GG from each lot to perform extraction tests to insure the proper aggregate gradation and asphalt content is being supplied in accordance with the approved ARHM-GG mix design. If the test results for any lot of ARHM-GG indicate that the ARHM-GG does not meet the requirements of the approved mix design the

Page 500 of 751 ends

BD-14
Contractor will be advised that he is not attaining the required composition and grading and that his materials need adjustment. ARHM -GG spreading operations shall not continue until the Contractor has notified the Engineer of the adjustment that will be made in order to meet the approved mix design. If the test results for any lot of ARHM -GG continue to indicate that the composition and grading does not conform to the approved mix design after adjustments have been made, the ARHM -GG represented by that lot shall be removed and replaced at the Contractor's expense and the Contractor shall suspend all further paving operations until the Contractor can demonstrate to the City that the ARHM-GG is in accordance with the approved mix design.

The Contractor shall provide for adequate quality control measures to insure that delivery of asphalt rubber shall be neither too slow nor too fast to prevent stopping of the paving operation and/or cooling of the asphalt rubber material. Material delivery scheduling and handling is critical to provide for optimum compaction opportunity and maximize ride quality performance.

Rock dust blotter material shall be required immediately after the completion of the "finish rolling" and prior to opening to traffic to prevent bleeding and tracking of the asphalt rubber material.

Rock dust blotter shall be per Section 200-1.2 of the Standard Specifications and shall be uniformly applied using a mechanical spreader, which distributes uniformly at a rate of approximately three pounds per square yard. Compaction rollers shall not be allowed on the rock dust covered pavement surfaces. All excess rock dust blotter shall be removed from the street at the end of each workday. The removal of the rock dust blotter shall include removal from adjacent streets as needed. No excess rock dust blotter shall be left on any street after normal work hours. The cost of this application will be included into the contract unit price bid for ARHM.

Measurement

The quantities of the asphalt rubber hot mix (ARHM) to be paid for will be measured by the actual tonnage (ton) of material and no additional compensation will be allowed therefor. The Contractor shall furnish to the City of Montebello at the time of delivery of the material on the job site a legible copy of a licensed weighmater’s certificate showing gross, tare, and net weights of each truckload of asphalt concrete mixture.

Tack Coat (Not a Bid item)

Existing concrete gutter and curb faces shall be protected against disfigurement from the asphalt.

Residue of the material shall be removed from gutter and curb faces by sandblasting to the extent required by the Engineer.

The tack coat shall be applied as specified in Subsection 302 -5.8 of the Standard Specifications and these Special Provisions. The Engineer will determine if the pavement is sufficiently dry for the application of the tack coat. Tack coat shall not be applied when the temperature of the surface to be tacked is below 40 degrees F in the shade.

No separate measurement and payment will be made for tack coat. Payment shall be included in the contract unit price for ARHM-GG Pavement.

Page 501 of 751 ends

BD-15
Payment for Construction of ARHM Overlay , shall conform to the provisions of Subsection 302-5.9 of the Standard Specifications for Public Works Construction. All the requirements stated above shall be included in the unit price bid per TON. The contract unit price per ton shall include full compensation for all surface preparation furnishing all labor, materials, tools, equipment, removals, disposal, certified weigh tickets, and incidentals and for doing all the work involved, including furnishing, applying and cleaning up excess rock dust blotter. The City will not compensate the Contractor for any additional costs incurred by change or lack of availability of asphalt binders. Temporary surface work where required for traffic control or other purposes shall be considered included in the price bid for Traffic Control and no additional compensation will be allowed.

Item No 6—Seal cracks in existing cross gutter concrete

The scope of work for this item is to clean and install epoxy/resin or sealant in the existing cracks in longitudinal and lateral cross gutters where new AC pavement will join. The purpose of this work is to insure that the existing cracks will not become larger and to prevent water intrusion in the subgrade through the cracks. All work in this section shall conform to attached ACI (American Concrete Institute ) guidelines, Chapter 3 “Method of crack repair” See attached Appendix C
Contractor shall submit to the City for approval ,material specifications for the crack sealing of concrete cross gutters prior to start of work
All cracks in all cross gutters shall be repaired under the cost of this item.

Payment for this bid item shall be based on Lump Sum cost of doing the work under this item.

Item Nos 7 and 8 Adjust Existing Storm Drain/Sewer/Utility Manhole Frames and Covers to Finished Grade

This Bid Item shall include all labor, equipment and materials to adjust existing sewer/storm drain/utility manhole/vault frames and covers within the project limits to match finished grade if required. The work shall be performed in accordance with Section 403 of the Standard Specifications for Public Works Construction and per Standard Plans for Public Works Construction.

All existing covers that can be lowered and raised shall be lowered prior to cold milling/removal and adjusted to finished grade by the Contractor or by the Utility Owner for the Contractor. For utility frames and covers under the jurisdiction of Verizon, AT&T, Edison, Los Angeles County Flood Control District, Los Angeles County Sanitation Districts, and County Sewer Maintenance Districts, the Contractor shall contact these organizations to arrange for adjustment of their respective facilities a minimum of seven (7) working days prior to cold milling/paving operations in accordance with Section 403-3 of the Standard Specifications.

The adjustment of existing manholes/vaults to finished grade shall be performed after finish paving. The removal or addition of grade rings shall be required to facilitate adjustment. Frame

Page 502 of 751 ends

BD-16
and covers shall be thoroughly cleaned and reset to finished grade by cutting pavement one foot outside the limits of the frame and cover. Said cut shall be neat and uniform.

Payment for Adjustment Storm Drain/Sewer/Utility Manhole Frames and Covers to Finished Grade shall be paid for at the contract unit price per Each (EA) and shall be considered full compensation for labor and furnishing and placing all forms, materials, construction and expansion joints, curing compounds and equipment to complete the construction is considered as included in the price paid, and no additional compensati on will be allowed therefor. Where the manhole frame and cover is performed by the utility owner, no compensation will be made to Contractor.

Item No 9 – Adjust existing water valve cover and frame/can to finish grade The work under this item consists of marking the locations of all water valve cans, frames and covers and adjusting these covers to finished grade. There are several water purveyors for the City’s water supply, and Contractor shall coordinate with all purveyors and shall adjust water valve covers to grade to the satisfaction of all water purveyors. Please see attached map in Appendix A.

Although the plans show approximate locations of water valve covers shown by “W” Contractor shall be responsible for discovering and marking the locations of the valve covers accurately.

Contractor shall be responsible for adjusting these frames and covers to grade Contractor shall exercise extreme care when adjusting these covers. Paving over valve covers could result in water main leaks not being controlled by maintennace crews not being able to locate the valve covers in a timely manner for shutting leaking water mains. This situation could result in flooding conditions for businesses and residences in the vicinity of the project.

Contractor to coordinate with the various private water companies at obtaining final approval from these companies for the adjusting to grade of water valve covers.

The work under this item shall be paid for each (EA ) valve adjusted to grade and no other compensation will be allowed.

Bid Item No. 10 – Furnish and Install Traffic Signal Loop Detectors and Connect to DLC

All equipment, materials, and components for traffic detector loops and the installation thereof, shall conform to the latest edition of the Caltrans Standard Plans and Standard Specifications, Section 86-1.02F(2)(c), ‘Inductive Loop Conductor”, latest edition, except as noted in the Special Provisions and on the plans. These plans and specifications are hereinafter referred to as State Standard Plans and State Standard Specifications. Copies of these documents are available from Caltrans, District 7 office at 100 S. Main Street, Los Angeles, CA 90012 or the State Offices of Caltrans at 1900 Royal Oaks Drive, Sacramento, CA 95815 (916) 455-3520.

Traffic Signal Loop Detectors shall be Type E (6’ diameter) or Type Q (6’ length) per Caltrans Standard Plans ES-5A and ES-5B.

Contractor, as directed by City Engineer, shall remove existing loops and cut in new loops in AC areas.

Residue resulting from slot cutting/cleaning operations shall not be permitted to flow across shoulders or lanes occupied by public traffic and shall be removed from the pavement surface.

Page 503 of 751 ends

Contractor shall obtain approval from the City Engineer for exact location of new loop detector prior to final placement. Perform preliminary s triping layout prior to loop detector layout.

The Contractor shall test the new detectors with a motor driven cycle, as defined in the California Vehicle Code, that is licensed for street use by the Department of Motor Vehicles. The unladed weight of the vehicle shall not exceed 220 pounds, and the engine displacement shall not exceed 100 cubic centimeters. Special features, components, or vehicles designed to activate the detector will not be permitted. The Contractor shall provide an operator who shall drive the motor driven cycle through the response or detection area of the detector at not less than three (3) miles per hour or more than seven (7) miles per hour. The detector sensor unit shall provide the required output in response to this test.

Payment for Furnishing and Installing Traffic Signal Loop Detectors and Connect to DLC shall be at the contract unit price per Lump Sum (LS) basis installed complete and operational and shall be considered full compensation for furnishing all labor, tools, equipment, materials, coordination and incidentals, and for doing all the work involved in furnishing, installing, removals, salvaging, filling, traffic detector loops and appurtenances, providing temporary modifications to traffic signal system during construc tion as required, restoration work, operationally complete in place, as shown on plans, and as specified in the special provisions, and as directed by the City Engineer.

Bid Item No. 11 – Traffic Signing, Striping, Markings, House Address and Curb Painting Traffic Signing, Striping, Markings, and curb painting as shown on Contract Drawings shall conform to the Standard Specifications of the State of California (latest edition), Department of Transportation, Sections No. 81, 82 and 84 CALTRANS) and also as modified below.

Traffic stripes, pavement markings of arrows, symbols, numbers and words, shall conform to the California Department of Transportation Standard Specifications: Section 84 -2 Traffic Stripes and Pavement Markings, latest edition.

For existing striping or markings shown to be replaced outside of new pavement area and on existing concrete surface, Contractor shall remove by wet sandblasting only all existing striping/legends/markings. Raised dots and markings shall be removed by grinding.

Prior to project grinding and removal work, Contractor shall video all existing markings, painting and pavement devices for use in carrying out this Bid Item.

All crosswalks shall be safety (ladder type) crosswalks yellow in color in school zones. Preferred width for the crosswalks shall be 12’ wide. In some instances and based on conditions on the ground , the width could be adjusted downwards , only approved by the Public Works Director.

All crosswalks shall be minimum of 10’ wide.

Crosswalks shall have 24” wide lines spaced 2’ apart , shall be reflective thermoplastics. Please see sheet 33 of 59
Raised pavement markers other than blue hydrant markers shall conform to the California Department of Transportation Standard Specifications Section 81, current edition, and shall be of type as called for on the plans.

BD-17

Page 504 of 751 ends

BD-18
The Contractor shall furnish the necessary control points for all striping and markings, and shall be responsible for the completeness and accuracy thereof to the satisfaction of the City of Montebello.

Painted and raised pavement marker removal shall conform to Section 81 of the Caltrans Standard Specifications, current edition. All residue remaining as a part of the removal operations shall be removed from the site.

L
ayout shall be approved, in writing, by the Engineer prior to placing Thermoplastic, curb painting and markings.

T
hermoplastic Pavement striping and markings are per Caltrans Standard Plans.

ALL EXISTING PAVEMENT STRIPING AND MARKINGS SHALL BE REPLACED

WITH THERMOPLASTICS PAVEMENT STRIPING AND MARKINGS, REGARDLESS

OF IF SUCH MARKINGS AND CENTERLINE STRIPING WERE THERMOPLASTICS OR CONVENTIONAL.

M
arkings, as used in these Specifications, include both lines and miscellaneous markings applied to the pavement surface, painting of red curb and the installation of raised pavement markers.

Materials and installation for painted and raised pavement markers shall conform to Section 81 and 84 of Caltrans Standard Specifications, current edition.

The Contractor shall provide cat tracking for the centerline and lane lines the same day, following paving operations. Reflectorized “slurry tabs” may be used in lieu of painted cat tracking.

F
or house addresses, the contractor shall repaint existing residential house addresses within the project limits. The color of paint shall be white field with numbers in black on the new curb in front of each residence. Numbers shall be four (4”) inches in height, two and one -half (2 ½”) inches in width with a stroke width of approximately three-fourths (3/4”) inch.

T
he house number shall be centered on a six- inch (6”) by sixteen -inch (16”) rectangular background for house numbers. There should be a border of two inches (2”) all around and city and city logo.

H
ouse numbers shall be conventional block design with a vertical axis (not slanted). “Threes (3)” shall be rounded, not flat, on top. “Four (4)” shall be closed at the top. “Nines (9)” shall be inverted sixes (6”). “Ones (1)” shall be vertical line with a line to exceed one-half (1/2”) inch.

P
lace Raised Blue Reflective for Fire Hydrant
Two-Way Blue Reflective Fire Hydrant Raised Pavement Markers installation as shown on Contract Drawings are a part of this item and shall conform to the Standard Specification Sections 314-3.1 and 314-5.1 to 314-5.5 and shall be in accordance with the Caltrans Traffic Manual Section 81 “Markings” for each fire hydrant.

P
lace Reflective Raised Pavement Markers to Supplement Crosswalk Striping On
e-Way Reflective Pavement Markers shall be used to supplement ladder bar stripes where

Page 505 of 751 ends

BD-19
additional visibility is needed at night, such as a poorly lit street. Use clear Type G RPM’s for a white crosswalk, and yellow Type H for a yellow crosswalk.

New Sign Installation
New traffic signs installation is part of this item and shall be installed on steel posts as shown on the Contract Drawings and shall conform to the Standard Specifications of the State of California (latest edition), Department of Transportation, Section No. 56 (CALTRANS).

A
ll signs facing shall be manufactured of Diamond Grade Fluorescent VIP Sheeting. All signs shall have a graffiti film coating.

Th
e date of installation of a sign shall be embossed on the back of the sign and shall be considered as the start of the warranty period. “Property of Montebello” shall also be embossed on the back of the sign.

N
o signs shall be installed on traffic signal poles, unless otherwise shown on the plans or as directed by the City Engineer. Contractor shall remove, replace, or install signs mounted on traffic signal mast arms as directed by the City Engineer.

All signs placed within the public right-of-way shall be installed using the following guidelines:

No signs shall be placed on wood poles at any time.

Larger (wide) signs shall be mounted on top of a sign combination.

No
sign shall have an outside edge closer than one foot (1’) to the back of the curb.

Bottom of sign shall be at seven-foot (7’) minimum over sidewalk.

S
ign panel facing shall be perpendicular to approaching traffic unless otherwise specified by the Engineer.

Si
gn post shall be 12 feet channel type.

S
igns shall be mounted on posts in a good workmanship manner using metal hardware suitable for the type of installation made.

Installation materials shall be of stainless steel and theft proof.

Signs shall be kept a minimum distance of fifteen feet (15’) in from of trees, power poles, etc.

Signs shall be kept far away from trees so that tree growth will not obstruct the visibility of the traffic sign.

Th
e contractor shall obtain approval from the City Engineer for the location of any signs that may be unclear or questionable.

Sign posts shall be installed eighteen inches (18”) behind curb face. Sign posts installed within the sidewalk must maintain a minimum of four-feet (4’) horizontal clearance for pedestrians.

Page 506 of 751 ends

BD-20
All signs shall be standard size and reflectorized color as specified in the California Manual on Uniform Traffic Control Devices (California MUTCD) latest edition, unless otherwise shown on the plans.

Pa
yment for Traffic Signing, Striping, Markings, House address and Curb Painting shall be at the contract unit price per Lump Sum (LS) and shall be considered full compensation for furnishing all labor, materials (including adhesives, glass beads, and paint), tools, equipment and incidentals necessary to perform all work, involved in, or appurtenant to the installation of pavement striping, raised reflective pavement markers, painting curbs, blue markers, including removal and installation of traffic signs and posts as indicated, complete in place for the width specified, and pavement markings of arrows, symbols, numbers and words, as shown on the plans and as required by the Project Specifications and no additional compensation will be allowed.

The Contractor shall supply, erect, and maintain public improvement project signs for the duration of construction according to the specifications set forth below. A scaled layout of the sign shall be submitted to the City of Montebello for approval prior to fabrication. The sign is illustrated in Appendix “C”.

Size: 6 feet by 4 feet with a 7 feet clearance above ground level.

Mat
erials: 3/4- inch (exterior type) plywood (C-C EXT-DFPA grade).

S
upport: 4-inch by 4-inch by 11 feet posts.

Mounting Brackets: Mounting brackets shall be mounted using 2 1/2 inch bolts with washers on each post. Install one bracket each a distance of 16” from the top and bottom of the sign.

Background: 3M Diamond Grade VIP, International Orange, Engineering Grade or approved equal
Lettering: Silkscreen enamels, Helvetica medium. (6” High).

S
ign Placement: A) Per State of California Manual of Traffic Controls section 5-02.4, except as indicated heron.

B) Sign shall be visible for minimum of 500 feet.

C) All signs shall be placed on the side of the street facing the direction of traffic.

D) Where a road is to be completely closed, signs should be placed at the intersections which precede the closure. A sign should be placed facing each direction of traffic approaching the proposed closure area.

E) The sign will be moved by the Contractor per the AGENCY’S schedule.

Duration: The signs shall be placed a minimum of two weeks prior to start of work.

D
isposition: After the Notice of Completion is issued, the signs shall become the property of the AGENCY, and the Contractor shall deliver the signs to the Public Works Facility at no expense to the AGENCY.

Page 507 of 751 ends

BD-21

Cost for furnishing and Installation of Public Improvement Project Signs shall be included hall include full compensation for all labor, materials, tools, equipment, and for doing all work involved, including delivery of the sign to the Public Works Facility at the end of the project and filling the ground 2” holes in kind.

Bid Item No. 12 – Construction Survey, Staking, Re -establish Survey Monuments and Centerline Ties

It shall be the responsibility of the Contractor to supply any and all construction surveying and staking required if necessary. All surveying shall be performed under the direct supervision of a California Licensed Land Surveyor or a Civil Engineer duly licensed to perform land surveying.

It is the Contractor’s responsibility to Re -establish Survey Monuments and Centerline ties as disturbed in the field and shall conform to Standard Specification for Public Works Construction Section 309 and as modified below. All work done on monuments shall be recorded and copies thereof filed with the City of Montebello Engineer and the County Surveyor. This work will include all reestablishment of all monuments that are disturbed through the course of completing this project.

A corner record survey shall be completed and filed with the County of Los Angeles Surveyor for each survey monument that the Contractor resets. A copy of each corner record shall be provided to the City of Montebello after filing with the County.

Construction Staking consists of furnishing transportation, labor, materials, and equipment to provide surveying and field engineering under the direction of a land surveyor or professional engineer licensed in the State of California. Furnish skilled labor, instrument platforms, ladders and such other temporary structures, required lighting for making and maintaining points and lines in connection with the surveys required.

Construction Staking shall conform to the Standard Specification Section 3 -10. Work under this Section includes, but is not limited to, the following:

1. Establish and maintain horizontal and vertical control points from City of Montebello- supplied benchmarks and baselines.

2. Establish temporary benchmarks.

3. Layout of all work.

4. Construction staking for earthwork and paving work required on the project.

5. Control, staking, and grade checking for all earthworks.

6. Control for construction of reinforcing steel, concrete work, and structural steel work.

7. Maintain records on reproducible contract drawings (ASCII points file) of as-constructed locations of project components and features during the course of the project.

The City of Montebello reserves the right to check the accuracy of Contractor's survey measurements and calculations. Regardless of whether or not the City of Montebello exercises this right, the requirements for Contractor accuracy and adequacy will not be waived.

Page 508 of 751 ends

BD-22

Copies of all completion survey notes, and other data shall be furnished to the City of Montebello prior to beginning work that requires their use.

Prior to completion of Project and when requested by the City of Montebello, Contractor shall submit a copy of project drawing and certificate signed by California Registered Land Surveyor or Professional Engineer as applicable, that elevations and locatio ns of Work are in conformance with Contract Documents.

Contractor shall set permanent monuments and file “Record of Survey Map”. The contractor shall be responsible to maintain a complete and accurate log of control and survey work as it progresses.

Contractor shall field verify locations of survey control points prior to starting any work on the Project Site. Contractor shall establish and submit to the City of Montebello any temporary control points as necessary due to construction activity. The Contractor shall notify the City of Montebello of any discrepancies discovered and resolve prior to starting any work.

The Contractor shall lay out work from the City of Montebello's established control points, baselines, ranges and gauges and shall be responsible for all measurements in connection therewith. Furnish, at Contractor's expense, all stakes, templates, platforms, equipment, range markers, and labor as may be required in laying out any part of the Work from the points and lines established by the City of Montebello. The Contractor will be held responsible for the execution of the Work to such lines and grades as may be established or indicated by the City of Montebello.

It shall be the responsibility of the Contractor to maintain and preserve all stakes and other marks established by the Surveyor/Engineer retained by the Contractor until authorized to remove them.

If such marks are destroyed by the Contractor or through negligence prior to their authorized removal, they may be replaced by the City of Montebello. The expense of replacement will be deducted from any amounts due, or to become due, the Contractor.

Surveying shall conform to methods, procedures, and requirements of the Caltrans Survey Manual.

Contractor shall set finish grades at a maximum of 25-ft. intervals for dirt, 25-ft. intervals for rock and at all grade breaks. Contractor shall establish or reestablish baselines and field control points as necessary and provide all basic site engineering to assure accurate locations and elevations for construction. It will be Contractor’s responsibility to verify location and elevation of existing structures and utilities as required for new work.

Control datum for survey may be indicated on Contract Drawings. Contractor shall locate and p
rotect, or replace survey control and reference points, preserve permanent reference points during construction and provide record of survey for replacement at record monument. The Contractor shall report to the City of Montebello loss or destruction of any reference point or relocation required because of changes in grades or other reasons and replace dislocated survey control points based on original survey control. There will be no changes without prior written notice to the City of Montebello.

The City at the discretion of the Public Works Director may retain 20% of the payment under this item until such time the new survey documents are recorded with the LA County Recorder’s Office.

Payment for Construction Survey, Staking, Re-establish Survey Monuments and Centerline Ties shall be paid for at the contract unit price per Lump Sum (LS) and shall be considered full compensation for furnishing labor, materials, equipment and removal after construction, and no

Page 509 of 751 ends

BD-23
additional compensation will be allowed therefor. Contractor shall submit electronic files of surveys conducted for Progress Payments with each Pay Request.

Page 510 of 751 ends

APPENDIX “A”

PLAN SHEETS

Page 511 of 751 ends

CITY OF MONTEBELLO
SB1 2025-26

STREET IMPROVEMENT PROJECT
Sheet 1 of 54

GENERAL NOTES

REQUIRED SUBMITTALS BY THE CONTRACTOR
A. PRIOR TO COMMENCING WORK CONTRACTOR SHALL SUBMIT

A STATEMENT SIGNED BY AN AUTHORIZED OFFICIAL STATING

THAT CONTRACTOR HAS VISITED THE SITE AND IDENTIFIED

ALL SEWER MANHOLE COVERS, WATER VALVE COVERS , AND
ALL OTHER COVERS WITHIN PROJECT LIMITS.CONTRACTOR

SHALL NOTIFY THE CITY IF PLANS DO NOT SHOW ALL
COVERS WITHIN PROJECT LIMITS.

B. CONTRACTOR TO SUBMIT ALL ASPHALT AND CONCRETE

MATERIAL SPECIFICATIONS TO THE CITY FOR REVIEW PRIOR
TO CONSTRUCTION.

C. PRIOR TO SUBMITTING A BID, LAND SURVEYOR HIRED BY

CONTRACTOR SHALL IDENTIFY ALL EXISTING CENTERLINE
TIES WITHIN PROJECT LIMITS . TABULATION OF THESE

CENTERLINE TIE DATA MUST BE INCLUDED IN THE

BID/PROPOSAL SUBMITTAL CONTRACTOR'S LAND

SURVEYOR SHALL RESTABLISH THESE MONUMENTS FROM
EXISTING TIES NOT DISTURBED DURING CONSTRUCTION.

1. ALL WORK, MATERIAL, AND EQUIPMENT SHALL CONFORM TO

THE CITY OF MONTEBELLO STANDARD PLANS AND

SPECIFICATIONS, CONTRACT SPECIFICATIONS, THE

STANDARD SPECIFICATION/GREEN BOOK (CURRENT EDITION),

CALTRANS STANDARD PLANS, CALIFORNIA MANUAL OF

UNIFORM TRAFFIC CONTROLS DEVICES (CA MUTCD) FOR

CONSTRUCTION AND MAINTENANCE WORK ZONES, LA

COUNTY STANDARDS AND TO THE SATISFACTION OF THE CITY
ENGINEER, AND PUBLIC WORKS DIRECTOR.

2. CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT
OF SOUTHERN CALIFORNIA 811 48 HOURS PRIOR TO ANY
EXCAVATION.

3. CONTRACTOR SHALL OBTAIN ALL CITY PERMITS REQUIRED
PRIOR TO COMMENCING ANY WORK.

4. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS,

DIMENSIONS, ANGLES, AREAS, HEIGHTS, ELEVATIONS, AND
RADII ON THE PLANS. EXISTING CONDITIONS WHICH ARE

CONTRARY TO THOSE SHOWN ON PLANS SHALL BE VERIFIED
WITH THE CITY ENGINEER BEFORE PROCEEDING WITH WORK.

5. ALL WORK SHALL CONFORM TO THE PLANS AND STANDARD

SPECIFICATIONS IN ALL RESPECTS AND SHALL BE SUBJECT
TO APPROVAL OF THE CITY ENGINEER.

6. BY ACCEPTING THIS CONTRACT, CONTRACTOR HEREBY

RELEASES AND AGREES TO INDEMNIFY, DEFEND, HOLD

HARMLESS THE CITY, AND CITY ENGINEER, AGENTS,

EMPLOYEES, CONSULTANTS AND REPRESENTATIVES FOR ALL

DAMAGE TO PERSONS OR PROPERTY OR WRONGFUL DEATH

REGARDLESS OF WHETHER OR NOT SUCH CLAIM, DAMAGE,

LOSS OR EXPENSE IS CAUSED IN WHOLE OR IN PART BY THE

NEGLIGENCE, ACTIVE OR PASSIVE, OF CITY, ENGINEERS,

THEIR PARENT AND SUBSIDIARY COMPANIES, AS WELL AS
THEIR AGENTS AND EMPLOYEES.

7. THE CONTRACTOR SHALL NOTIFY THE CITY INSPECTOR 72

HOURS BEFORE COMMENCING WORK

8. ALL CONFLICTING IMPROVEMENTS, UTILITIES AND MATERIALS

SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND

SHALL BE REMOVED FROM THE PROJECT LIMITS BY THE

CONTRACTOR AT NO COST TO THE CITY, UNLESS OTHERWISE
NOTED ON THE PLANS OR IN THE SPECIFICATIONS.

9. THE CONTRACTOR SHALL PROTECT ALL EXISTING CITY

TRAFFIC AND STREET NAME SIGNS AND SHALL REPLACE ANY
DAMAGED SIGN AT NO COST TO THE CITY.

10.AS BUILTS OF THE COMPLETED PROJECT SHALL BE
SUBMITTED FOR APPROVAL BY THE CITY ENGINEER.

11.CONTRACTOR SHALL PROTECT ALL CENTERLINE SURVEY

MONUMENTS AND CENTERLINE TIES, IF OBLITERATED THESE

MONUMENTS MUST BE RESET BY CONTRACTOR'S LAND
SURVEYOR.

12.CONTRACTOR SHALL TAKE PHOTOGRAPHS OF ALL

LOCATIONS WHERE CENTERLINE MONUMENTS WILL BE
OBLITERATED DUE TO PAVING OPERATIONS.

ADDITIONAL NOTES TO CONTRACTOR

1. ALL EXISTING PAVEMENT MARKINGS AND STRIPING SHALL BE

REPLACED WITH NEW, EVEN IF STRIPING IS PARTIALLY PAVED OVER

2. ALL PAVEMENT MARKINGS, RIPPING AND MARKINGS ADJACENT TO

PAVING AREAS SHALL BE PROTECTED BY THE CONTRACTOR AND
CLEAN FROM ALL OMINOUS AND THE DELIRIOUS MATERIALS. IF

CONTRACTOR IS UNABLE TO CLEAN THOSE MARKINGS TO THE

SATISFACTION OF THE PUBLIC WORKS DIRECTOR, THE CONTRACTOR

TO REPLACE ALL EXISTING STRIPING AND PAVEMENT MARKINGS WITH

NEW UNLESS PLANS SHOW OTHERWISE

3. CONTRACTOR SHALL LOCATE ALL THE WATER VALVE COVERS STREET AND OTHER UTILITY MANHOLES AND MARK THEIR LOCATIONS. PRIOR

TO PAVING CONTRACTOR SHOULD SUBMIT TO THE CITY THE METHOD OF MARKING THESE LOCATIONS PRIOR TO PAVING. THIS WILL ENABLE

THE CONTRACTOR TO EASILY LOCATE PAVED OVER WATER VALVE
COVERS AND MANHOLES.

4. ALL PAVEMENT MARKINGS AND STRIPING SHALL CONFORM TO THE LATEST EDITION OF CALIFORNIA MUTCD PART 3 UNLESS APPROVED

OTHERWISE BY THE CITY

5. PLANS AND SPECIFICATIONS WERE PREPARED BY THE CITY BASED ON

FIELD RECONNAISSANCE AND AERIAL MAPS AND THE INFORMATION CONTAINED IN THE MAPS MAY NOT BE 100% CORRECT OR ACCURATE .CONTRACTOR MUST CONDUCT HIS OWN FIELD INVESTIGATION PRIOR TO SUBMITTING A BID AND FAMILIARIZE HIMSELF WITH THE SITE.

CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THE PLANS.

6. JOIN LINES CONTRACTOR TO JOIN NEW AC AND

EXISTING PERPENDICULAR CROSS GUTTERS,

LONGITUDINAL CROSS GUTTERS AND

PROLONGATION OF THE GUTTER OR CURB LINE ON

INTERSECTING STREETS

7. CONTRACTOR TO SUBMIT A WORK SCHEDULE WITH
STREET LOCATIONS INCLUDED. CONTRACTOR

MUST ALSO SUBMIT THE TRAFFIC CONTROL PLAN

AND SHALL COORDINATE COLD MILLING OF STREET

SECTIONS WITH THE CITY IN ORDER TO MINIMIZE

DISRUPTION OF CITY STREETS BY MINIMIZING THE
NUMBER OF STREETS COLD MILLED AT ONE TIME.

8. CONTRACTOR SHALL PLACE PROJECT

CONSTRUCTION NOTICES AT EACH END OF STREET

SECTIONS SLATED FOR OVERLAY THE SIGN MUST

BE APPROVED BY THE CITY PRIOR TO PLACEMENT

9. CONTRACTOR SHALL PLACE NO PARKING SIGNS ON
ALL STREETS TO BE COLD MILLED AND PAVED.

SUCH NO PARKING SIGNS SHOULD BE ACCURATE
AS OF THE DATE AND TIME THE WORK WILL OCCUR.

IF NO WORK OCCURS ON A CERTAIN STREET AND
“NO PARKING SIGNS” ARE UP CONTRACTOR SHALL

REPLACE NO PARKING SIZE WITH MORE UPDATED

DATES AND TIMES OF THE TIME WORK WILL
COMMENCE.

10.CONTRACTOR SHALL PROTECT IN PLACE ALL

CROSS GUTTERS, CROSSWALKS, CURB, AND

GUTTERS AND OTHER IMPROVEMENTS AND

FEATURES ADJACENT TO PROJECT AREA AND

SHALL PREVENT DAMAGE RESULTING FROM HEAVY

EQUIPMENT USED BY CONTRACTOR AND PREVENT

ALSO DEPOSITION OF ALL BITUMINOUS AND OTHER
DELETERIOUS MATERIALS. CONTRACTOR SHALL

CLEAN ALL AFFECTED AREAS BY CONSTRUCTION
EQUIPMENT.

11.CONTRACTOR SHALL BE RESPONSIBLE FOR

DAMAGE TO UNDERGROUND UTILITIES RESULTING

FROM HIS WORK

12.CITY WHILE PREPARING PLANS HAS NOT OBTAINED

PLANS FOR UNDERGROUND FACILITIES OF LOOPS,

CONDUITS, NOR HAS SUCH FACILITIES BEEN FULLY
PLOTTED ON PLANS. CONTRACTOR TO

COORDINATE WITH CITY AND LA COUNTY TRAFFIC

SIGNAL MAINTENANCE DIVISION

13.CONTRACTOR SHALL OBTAIN A NO FEE PERMIT

FROM THE CITY

14.A CA LICENSED LAND SURVEYOR HIRED BY

CONTRACTOR SHALL IDENTIFY, PRIOR TO THE

CONTRACTOR BID SUBMITTAL ALL EXISTING

CENTERLINE TIES AND MONUMENTS AND SHALL

INCLUDE THESE LOCATIONS IN AN ATTACHMENT TO
THE OFFICIAL BID/PROPOSAL BY CONTRACTOR.

15.CONTRACTOR SHALL CLOSELY IMPLEMENT ALL

NPDES/STROM WATER POLLUTION PREVENTION
REQUIREMENTS. VIOLATIONS WILL BE REPORTED

TO THE STATE AND COUNTY AGENCIES
RESPONSIBLE FOR ENFORCEMENT.

16.CONTRACTOR SHALL CLOSELY ADHERE TO ALL

SAFETY REQUIREMENTS RELATED TO EQUIPMENT,
WORKERS AND THE PUBLIC AT LARGE.

STRIPING PAVEMENT MARKINGS

ALL PAVEMENT MARKINGS LIKE CENTERLINES, STOP SIGNS, CROSSWALKS,

ADVANCE WARNING MARKINGS, HANDICAP SPACES ADJACENT TO CURBS, SHALL BE REPLACED WITH THERMOPLASTIC.

AT INTERSECTIONS WHERE IT SHOWS CROSSWALKS TO BE STRIPED ON ALL 4 WAYS, THE CROSS WALKS SHALL BE THERMOPLASTIC EVEN OUTSIDE THE PROJECT AREA.

INTERSECTING STREETS JOINS
CONTRACTOR TO JOIN EX. AC ALONG THE PROLONGATION OF GUTTER OR CURB LINE ALONG INTERSECTING STREETS.

CONTRACTOR TO JOIN ALL EX. TRANSVERSE OR LONGITUDINAL GUTTERS.

ALL CROSS GUTTERS ADJACENT TO WORK AREA TO BE CRACK SEALED PER ITEM NO. 6 OF BIDDING SCHEDULE IN PAGE C-3 OF THE SPECIFICATION.

INTERSECTONS PAVING

CONTRACTOR TO PAVE INTERSECTION IF BOTH SIDES OF INTERSECTING STREETS HAVE BEEN RECENTLY PAVED. IF BOTH SIDES OR ONE SIDE OF AN INTERSECTING STREET IS PAVED, THEN INTERSECTION SHALL BE PAVED.

CITY OF MONTEBELLO

STREET IMPROVEMENT PROJECT

THESE NOTES SHALL TAKE PRECEDENCE OVER PLANS

Page 512 of 751 ends

CITY OF MONTEBELLO
SB1 2025-26

STREET IMPROVEMENT PROJECT
Sheet 2 of 54

CITY OF MONTEBELLO

STREET IMPROVEMENT PROJECT

STREET FROM TO
2 N 6TH ST. W. OAKMONT DR. LINCOLN AVE.
3 VIEWCREST E. OAKMONT DR. RAYWOOD AVE.
4 N VAIL AVE. LOMA RD. WESTMORELAND DR.
5 SAN ANTONIO DR. N. WILCOX AVE. 20TH ST.
6 VAI SAN DELARRO BRADSHAWE ST. WEST CITY LIMITS
7 N 19TH ST. W. BEVERLY BLVD. W. MADISON AVE.
8 N. 20TH ST. W. MADISON AVE. W. LINCOLN AVE.
9 N. LEONARD ST. BARR AVE. DEWAR AVE.
10 FINDLAY AVE. BEVERLY BLVD. SOUTH CITY LIMITS
11 N 21ST ST. W. BEVERLY BLVD. W. MADISON AVE.
12 N. 7TH ST. W. LINCOLN AVE. W. MADISON AVE.
13 E. FREMONT SQ. POPLAR AVE. END
14 N.6TH ST. W. LINCOLN AVE. W. MADISON AVE.
15 S. 5TH ST. W. WHITTIER BLVD. W. OLYMPIC BLVD.
16 S. 2ND ST. HARDING AVE. LOS ANGELES AVE.
17 N. GREENWOOD
AVE.

W. CLEVELAND AVE. W. OLYMPIC BLVD.
18 CALIFORNIA AVE. W. WHITTIER BLVD. LOS ANGELES AVE.
19 THYNNE ST. FERGUSON DR. END
20 JOYCE ST. FERGUSON DR. END
21 WORK ST. FERGUSON DR. END
22 HORNBY ST. FERGUSON DR. END
22b STORE ST. FERGUSON DR. END
22c THURLOW ST. FERGUSON DR. END
23 HEREFORD DR. PICKERING WAY S. CONCOURSE AVE.
24 DATE ST. S. GREENWOOD
AVE.

SPRUCE ST.
25 S. SPRUCE ST. DATE ST. OAKWOOD ST.
26 OAKWOOD ST. S. SPRUCE ST. S. GREENWOOD
27 CAROB WAY E. WASHINGTON
BLVD.

JACMAR DR.
28 S.GREENWOOD AVE. SYCAMORE ST. END
1 W. BURKE DR. POPLAR AVE. END

VICINITY MAP
N.T.S.
60 POMONA FWY.

N. MONTEBELLO BLVD.

W. WHITTIER BLVD.
1 5
2 4 3
N. WILCOX AVE.
6 78
10 911
12 1314
15 16
17 18
19 2021
22c
23 24
25 26
27 28

SOUTH CITY LIMITS

EAST CITY LIMITS

WEST CITY LIMITS
I-5 SANTA ANA FWY.

GREENWOOD AVE.
22b
22

Page 513 of 751 ends

CITY OF MONTEBELLO
SB1 2025-2026 STREET REHAB
STREET: W. BURKE DR.

FROM: POPLAR AV.

TO: END
Sheet 3 of 54
NORTH
SCALE: NTS
W. BURKE DR.
100104108114
116
120
124
130
120 109 105 101 POPLAR AV.
1 1 2
S W
FH
W
S36'-6" 36' 36'-6"
26'-4"
CROSS
GUTTER
6 1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

Page 514 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS
2 Sheet 4 of 54
SB1 2025-2026 STREET REHAB
STREET: N. 6TH ST.

FROM: W. OAKMONT
TO: LINCOLN AVE.
504
516
704
705
708
709
712
713
716
717
720
721725
724
729
728732
733
N. 6TH ST.

LINCOLN AVE.
737
W. OAKMONT DR.

W
S
FH
36' S
WGAS
6'
CROSS
GUTTER
WHITE RAISED MARKERS 2 SEWER MANHOLES
2 WATER VALVES
WHITE
LINE
CROSS

WALKSTOP
1 2 6
JOIN
EX. AC
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

Page 515 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS
3 Sheet 5 of 54
SB1 2025-2026 STREET REHAB
STREET: VIEW CREST DR.

FROM: E. OAKMONT DR.

TO: RAYWOOD AVE.
800
804
808
812
816
317
325
401
409
415
330
326320
829408406400
801
805
809
813
817
821
308
312 316
320
N. RAYWOOD AVE.

N. VIEW CREST DR.

E. VIEW CREST DR.

E. OAKMONT DR.

EXISTING CENTERLINE STRIPING
36'
S
36'
W 35'-9"
10'-6"
6'-4"
CROSS
GUTTER
6' CROSS GUTTER
1 2
S
S
6 1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

Page 516 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS Sheet 6 of 54
SB1 2025-2026 STREET REHAB
STREET: N. VAIL AVE.

FROM: LOMA RD.

TO: GERMAIN DR.
4a
17131721
17221730
GERMAIN DR.

LOMA RD.

N. VAIL AVE.
1 2
37'
36'-6"
37'
W
W STOP
STOP
JOIN
EX. AC
6 JOIN
EX. AC
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

Page 517 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS Sheet 7 of 54
SB1 2025-2026 STREET REHAB
STREET: N. VAIL AVE.

FROM: GERMAIN DR.

TO: CABOT PL.
4b844
1721
840
836
835
832
831
828
825
824
821
820
817
CABOT PL.
812
812
809
808
805
804
801
800
1720
1713
1721
GERMAIN DR.
817
B B
B B
1 2
1 2N. VAIL AVE.

STOPW
WV
FH
36'-4"
36'-3"
N. VAIL AVE.

STOP
LAC
FD MH
W
JOIN
EX. AC
JOINEX. AC
7 6

LA COUNTY

FLOOD CONTROL

MANHOLE
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

Page 518 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS Sheet 8 of 54
SB1 2025-2026 STREET REHAB
STREET: N. VAIL AVE.

FROM: CABOT PL.

TO: DARCY DR.
4c871
867
863
864
860859
853
847
850
846
844
1721
DARCY DR.

LADYWOOD PL.

CABOT PL.
1730
N. VAIL AVE.
1 2
JOIN
EX. AC
STOP
27'
WFH
STOP
WFH
S
S
S
JOIN
EX. AC
6 EXISTING CENTERLINE STRIPING
JOIN
EX. AC
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

Page 519 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS
4d
Sheet 9 of 54
SB1 2025-2026 STREET REHAB
STREET: N. VAIL AVE.

FROM: DARCY DR.

TO: WESTMORELAND DR.
890
1740
891
887
883
1737
879
875
1730
871
867
N. VAIL AVE.

BALDWIN PL.

DARCY DR.
1 2
EX. 33' WIDE

CROSS GUTTER PROECT IN PLACE
JOINEX. CROSS GUTTER
36'
W
W STOP
WESTMORELAND DR.JOIN EX. AC
6 S
S
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

JOIN AC

Page 520 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS
5 Sheet 10 of 54
SB1 2025-2026 STREET REHAB
STREET: SAN ANTONIO DR.

FROM: N. WILCOX AVE.

TO: AND 20TH ST. FROM
LINCOLN AVE. TO SAN ANTONIO DR.

SAN ANTONIO DR.
2124 2120 2116 2112 2108 2104 2100 2016 2012 2008 2004
N. WILCOX AVE.
20TH ST.
2125 2121 2117 2113 2109 2105 2101 2017 2113 2009 2005 705 2000
2000
712
708
704
1912
LINCOLN AVE.
37'
STOP
EX. HUMP
HUMP
AHEAD
HUMP
AHEAD

CROSSWALK

YELLOW SAFTEY LADDER

TYPE CROSSWALK

REPLACE WITH THEMOPLASTIC
S
STOPW
JOIN
EX. AC
1 2 6
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
EX. HUMP

DOUBLE SOLID YELLOW LINE
CROSS
GUTTER

Page 521 of 751 ends

3512 3508 3500
350135053509
BRADSHAWE ST.
3528 3524 3520 3516
35173521352535293531

VIA SAN DELARRO
KEENAN ST.
3513

CITY OF MONTEBELLO
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: VIA SAN DELARRO
FROM: BRADSHAWE ST.

TO: KEENAN ST.

Sheet 11 of 54
6a
JOIN
1 2 6
STOP

THERMOPLASTIC
C.B.

W

IN CONCRETE
15MPH

WITH FLAGS UNTIL

FURTHER NOTICE

FROM CITY
EX.

CROSS
GUTTER
EX.

CROSS
GUTTER
37'
S

NO CENTERLINE STRIPING
NAIL
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

DRAIN MH

INSTALL

NEW SPEED HUMP
HUMP
AHEAD
2162.2101

TO BE DETERMINED BY

CITY TRAFFIC ENGINEER
W17
W16-7P
6' WIDE

CROSS GUTTER

CONTRACTOR TO FURNISH POSTED SIGNS & POSTS

ON VIA SAN DELARRO BETWEEN BRADSHAWE & SIMMONS
FOR 2 NEW SPEED HUMPS
NOTE:
731.6960

TBD TO BE DETERMINED
2460.3977

TBD TO BE DETERMINED

Page 522 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS
6b
600 3552 3548 3544 3540 3536
353735413545354935533557

WEST CITY LIMIT
KEENAN ST.

SIMMONS ST.

SB1 2025-2026 STREET REHAB
STREET: VIA SAN DELARRO
FROM: KEENAN ST.

TO: WEST CITY LIMITS
Sheet 12 of 54

VIA SAN DELARRO
1 2 6
JOIN
EX. AC
5828

RESERVED HANDICAP SPACE MARKING

REPLACE WITH THERMOPLASTIC

AND REPAINT CURB
(TYPICAL ALL HANDICAP SPACES)
W
FH
S
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

WITH FLAGS
W17-1
W16-7P
HUMP
1829.7671

TBD TO BE DETERMINED
AHEAD
1464.0018

TBD TO BE DETERMINED

Page 523 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS
7a
Sheet 13 of 54
321 317 313 309 305 301
320 312 1820
W. MADISON AVE.

A
A
A
A
345 341 337 333 329 325
344 340 336
332 328 324W. HARDING AVE.

N. 19TH ST.

N. 19TH ST.

SB1 2025-2026 STREET REHAB
STREET: N. 19TH ST.

FROM: W. HARDING AVE.

TO: W. MADISON AVE.

JOIN 1 2 6
36'-6"
S

NAIL/TAG
W
GAS

NO STRIPING
R&R
4' WIDE
CROSS
GUTTER
JOIN
STOP
4'
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

Page 524 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS
7b
Sheet 14 of 54
417 413 409 405 401
418 414 408 404 400
W. HARDING AVE.
421
422
B
B
B
B
437 433 429 425 421
438 434 430 426 422
BEVERLY BLVD. N. 19TH ST.

SB1 2025-2026 STREET REHAB
STREET: N. 19TH ST.

FROM: W. BEVERLEY BLVD.

TO: W. HARDING AVE.

N. 19TH ST.

S

NO CENTERLINE STRIPING
S
STOP
18'-9"

REPLACE THERMOPLASTIC

STOP SIGN COMPLETELY
EX. THERMOPLASTIC

CROSSWALK WHITE LINE
17'-10"

DOUBLE YELLOW LINE
JOIN
EX. PAVEMENT
1 2 6
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

Page 525 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS Sheet 15 of 54
8a
191719301913631
1994
W. VICTORIA AVE.

W. BEVERLY BLVD.

A
A
601
N. 20TH ST.
2001631627621617611607
646640636630626620616610
W. LINCOLN AVE.

A
A
N. 20TH ST.

SB1 2025-2026 STREET REHAB
STREET: N. 20TH ST.

FROM: W. BEVERLY BLVD.

TO: W. LINCOLN AVE.

STOP
SS W
FH
S
W
FH
W
FH
STOP

REPLACE THERMOPLASTIC

CROSSWALK ENTIRELY

CROSSWALK

WHITE LINE DOUBLE YELLOW

SOLID LINE
JOIN
EX. PAVEMENT

NO CENTERLINE STRIPING
18'-3"
18'-3"
1 2 6
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
JOIN
EX. PAVEMENT
STOP
STOP
EX.

CROSS
GUTTER
JOIN
W
FH

Page 526 of 751 ends

NORTH
SCALE: NTS Sheet 16 of 54
8b
SB1 2025-2026 STREET REHAB
STREET: N. 20TH ST.

FROM: W. BEVERLY BLVD.

TO: W. MADISON AVE.
433429425421417413409405401
400 404 408 412 416 420 424 428
W. BEVERLY BLVD.

N. 20TH ST.

W. HARDING AVE.
345341
344340336
337
332
333
328
329
324
325
320
321
316
319309
312308
305
304
2000
300
W. HARDING AVE.

W. MADISON AVE.

N. 20TH ST.

CITY OF MONTEBELLO

NO CENTERLINE STRIPING
EXCEPT @ W. BEVERLY BLVD.

SW
FH
W
FH
STOP
EX. CROSSWALK

RE-STRIPE

WHITE LINEREPLACE THERMOPLASTIC

STOP SIGN COMPLETELY

SDOUBLE YELLOW
CENTER LINE 18'-3"
18'-3"
W
FH

S JOINS
STOP

THERMOPLASTIC

STOP SIGN AND BAR
36'-4"
JOIN
1 2 6
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
JOIN

Page 527 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS Sheet 17 of 54
774
773 769
768
765
764
761
760
757
756
753
752
749
748
745
744
741
736
737
734
735
730
DEWAR AVE.
729
728
725
724
721
720
717
716
713
712
709
708 704
701
700
BARR AVE.

N. LEONARD ST.

A
705
A
A
N. LEONARD ST.

SB1 2025-2026 STREET REHAB
STREET: N. LEONARD ST.

FROM: BARR AVE.

TO: DEWAR AVE.
9 A
JOIN
STOP
THERMOPLASTIC38'S

PAVING OVER
GUTTER
STOP

THERMOPLASTIC
W
W
JOIN
S
1 2 6
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

Page 528 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS Sheet 18 of 54
10a
SB1 2025-2026 STREET REHAB
STREET: FINDLAY AVE.

FROM: BEVERLEY BLVD.

TO: W. VIA CORONA
517505 503501
BEVERLY BLVD.

W. VIA CORONA
FINDLAY AVE.

ALLEY
ALLEY
1 2 6
JOIN30'
S S
W W
W W
HUMP
AHEAD

THERMOPLASTIC

EXISTING STRIPING
3127
NOTE:

RESTRIPE ALL
4 CROSSWALKS
YELLOW @ INTERSECTION
JOIN
14'-9"
YELLOW

SINGLELINE

CROSSWALK
W
NICK'S
CAFE
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

Page 529 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS Sheet 19 of 54
SB1 2025-2026 STREET REHAB
STREET: FINDLAY AVE.

FROM: W. VIA CORONA
TO: VIA LASTRE
10b
461
W. VIA CORONA
457453449445441
FINDLAY AVE.

VIA LASTRE
1 2 6
25 THERMOPLASTIC

REPLACE

SPEED HUMPS
S
JOIN

REPLACE

CROSS GUTTER

EXISTING

CENTERLINE

STRIPING
HUMP

AHEADHUMP
AHEAD
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
JOIN EX. AC

Page 530 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS Sheet 20 of 54
SB1 2025-2026 STREET REHAB
STREET: FINDLAY AVE.

FROM: VIA LASTRE.

TO: SOUTH CITY LIMITS
10c
441

VIA LASTRE
437433429425421417
436
FINDLAY AVE.
413409405
412408404400
A

SOUTH CITY LIMITS
FINDLAY AVE.

A
A
A
432428424420416
1 2 6
GREEN
OPEN
SPACE
GREEN

OPEN SPACE
W
HUMP
AHEAD
S
HUMP
HUMP
AHEAD

THERMOPLASTIC
HUMP
R&R
JOIN
EX.

PAVEMENT
HUMP
AHEAD
NOTE:

REMOVE EX. SPEED

HUMP & REPLACE WITH NEW

EXISTING STRIPING
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
REMOVE EX. SPEED HUMP
& REPLACE WITH NEW

Page 531 of 751 ends

W. BEVERLY BLVD.
440
437433429425
421417
409
2101
436432428
424420
416412408W. HARDING AVE.
405401
404400
N. 21ST ST.
413

CITY OF MONTEBELLO
NORTH
SCALE: NTS Sheet 21 of 54
11a
SB1 2025-2026 STREET REHAB
STREET: N. 21ST ST.

FROM: W. BEVERLY BLVD.

TO: W. HARDING AVE.
1 2 6
EX. SOLID YELLOW LINE
S
36'S
W
STOP
AHEAD
W
36'STOP12' WIDE

YELLOW SAFETY

CROSSWALK

THERMOPLASTIC
JOIN

CROSSWALK
GUTTER

THERMOPLASTIC
JOIN EX. PAVEMENT

WHITELINE CROSSWALK
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

Page 532 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS
Sheet 22 of 54
11b
SBI 2025-2026 STREET REHAB
STREET: N. 21ST ST.

FROM: W. HARDING AVE.

TO: W. MADISON AVE.
317313309
318314310
305301
309302
N. 21ST ST.W. MADISON AVE.

B
B
329325321
328324320
N. 21ST ST.
345
344
337
340
333
338 W. HARDING AVE.

B
B
1 2 6

SAFTEY YELLOW

CROSSWALK

THERMOPLASTIC
W
FH

HANDICAP SPACE & BLUE CURB
S
S
STOP
AHEAD
S
STRIPING ONLY @ INTERSECTION
S
STOP
JOIN
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

Page 533 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS
Sheet 23 of 54
SB1 2025-2026 STREET REHAB
STREET: N. 7TH ST.

FROM: W. LINCOLN. AVE.

TO: W. VICTORIA AVE.
12a
621636
637633
632628
629625
624620
621
701
LINCOLN AVE.

N. 7TH ST.
616
617613
612
609
608620W. VICTORIA AVE.

N. 7TH ST.

A
A
A
A
JOIN
1 2 6
STOP
W
STOP
STOP

CROSSWALK
GUTTER
S
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
36'-5"
JOIN
W
S

Page 534 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS
Sheet 24 of 54
SB1 2025-2026 STREET REHAB
STREET: N. 7TH ST.

FROM: W. VICTORIA. AVE.

TO: W. BEVERLY BLVD.
12b
546
545
540
541
536
537535
532528
529
524
525
521
520516
517
512
513
W. BEVERLY BLVD.

N. 7TH ST.

N. 7TH ST.

W. VICTORIA AVE.

A
A
A
A
S
S
STOP
STOP
W

CROSSWALK
GUTTER
1 2 6
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade CONSTRUCTION NOTES:

W
S
SD
8 Furnish and install traffic signal loop detectors and connect to DLC 9 Remove existing speed humps and install new per City standards 6 Contractor to seal all cracks in all cross gutters joining new AC pavement 7 Restripe all existing pavement markings and centerlines with thermoplastic.

NO CENTERLINE STRIPING
W

Page 535 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS Sheet 25 of 54
SB1 2025-2026 STREET REHAB
STREET: N. 7TH ST.

FROM: W. BEVERLY BLVD.

TO: W. HARDING AVE.
12c
433
430
429
428
425
426
421415
416 420412
413
408
405
406402
401
W. HARDING AVE.

N. 7TH ST.

W. BEVERLY BLVD.

STOP
STOP S
S
CROSS
GUTTER
STOP
JOIN
WW
1 2 6
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
W
S
2 WATER VALVES

Page 536 of 751 ends

CITY OF MONTEBELLO
NORTH
SCALE: NTS
Sheet 26 of 54
SB1 2025-2026 STREET REHAB
STREET: N. 7TH ST.

FROM: W. HARDING AVE.

TO: W. MADISON AVE.
12d
345
344
341
340336
337333
332
329
328324
325
N. 7TH ST.

W. HARDING AVE.
312
313309
308302
305
W. MADISON AVE.

N. 7TH ST.
320
321317
316
B
B
B
B
S
STOP
W

STOPJOIN

CROSSWALK

STOP GAS S
1 2 6
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
W
FH
S

NO CENTERLINE

Page 537 of 751 ends

228 208 214 220 224
224 207 213 221 225
POPLAR AVE.
228 232 236
229 233
240 244 246 248 252
E. FREMONT SQUARE

CITY OF MONTEBELLO
SB1 2025-2026 STREET REHAB
STREET: E. FREMONT SQ.

FROM: POPLAR AVE.

TO: END
Sheet 27 of 54
13 NORTH
SCALE: NTS
1 2 6
S
STOP
JOIN

CONCRETE
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
W
WWW
S
235

NO CENTERLINE

Page 538 of 751 ends

601
517
637
636
633
632
629625
624
621
620
617613
616612
609605
608604
601
600
LINCOLN AVE.

N. 6TH ST.

W. VICTORIA AVE.

CITY OF MONTEBELLO
Sheet 28 of 54
14a
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: N. 6TH ST.

FROM: W. LINCOLN. AVE.

TO: W. VICTORIA AVE.
628
1 2 6

STOPCROSSWALK
GUTTER
STOP
S
STOP
JOIN
EX. AC

YELLOW BROKEN CENTERLINE
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
S

Page 539 of 751 ends

W. VICTORIA AVE.
544
545
540
541
536
537
532
533
528
529
524
525
520
521
N. 6TH ST.
516
517
512
513
W. BEVERLEY BLVD.

CITY OF MONTEBELLO
Sheet 29 of 54
14b
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: N. 6TH ST.

FROM: W. VICTORIA AVE.

TO: W. BEVERLY BLVD.
1 2 6
JOIN

CONCRETE

DOUBLE YELLOW

SOLID LINE
STOP

STRIPING HANDICAP PARKING SPACE BLUE CURB

BROKEN YELLOW CENTERLINE STREET
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
S

Page 540 of 751 ends

CITY OF MONTEBELLO
Sheet 30 of 54
14c
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: N. 6TH ST.

FROM: W.BEVERLY BLVD.

TO: W. HARDING AVE.
441437
440
433
432428
429
424
425
420
421
416
417413
412
N. 6TH ST.
408
409
404
405
W. HARDING AVE.

W. BEVERLY BLVD.
1 2 6

STOPCROSSWALK
GUTTER
S

EXISTING

CROSSWALK
GUTTER
GOOD
S
W
JOIN

CONCRETE

PAVEMENT

WHITE LINE

CROSSWALK

RE-STRIPE

DOUBLE YELLOW
BROKEN

CENTERLINE
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
S
S
W
REPLACE 8 LOOPS 7

Page 541 of 751 ends

CITY OF MONTEBELLO
Sheet 31 of 54
14d
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: N. 6TH ST.

FROM: W. HARDING AVE.

TO: W. MADISON AVE.
344
345
340
341
336
337
332
333
328
329
324
325
N. 6TH ST.

W. HARDING AVE.320316
317
312
315311
308304
305301
300
W. MADISON AVE.
321
1 2 6
STOP
STOP

YELLOW CENTERLINE STRIPING
JOIN
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
S S
W
W
PAVE

INTERSECTION
OF HARDING AVE.
& 6TH ST.

HANDICAP SPACE & BLUE CURB

Page 542 of 751 ends

222
225 227
228 230
229
232
233
236
237
240
239
242
253
246
255
W. OLYMPIC BLVD.

S. 5TH ST.
203
425 206
209
212
215
216
219
220W. LOS ANGELES AVE.

CITY OF MONTEBELLO
Sheet 32 of 54
15a
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: S. 5TH ST.

FROM: W. LOS ANGELES AVE.

TO: W. OLYMPIC BLVD.
1 2 6
STOP

REPLACE

STOP SIGN LEGEND

AND LINE
JOIN EX.

PAVEMENT
S S

EXISTING

CROSS GUTTER
W
JOIN
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
W

Page 543 of 751 ends

104W. WHITTER BLVD.

S. 5TH ST.
115 117 121 125 129 137 141 145
114 118 120 124 134 136 140 144
W. LOS ANGELES AVE.
128
133

CITY OF MONTEBELLO
Sheet 33 of 54
15b
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: S. 5TH ST.

FROM: W. WHITTER BLVD.

TO: W. LOS ANGELES AVE.
1 2 6
JOIN
EX. PAVEMENT
STOPS
NOTE: CONTRACTOR TO RE-STRIPE
ALL 4 WHITELINE SAFETY CROSSWALKS
@ INTERSECTION WITH SAFETY

THERMOPLASTIC CROSSWALK
S

JOIN PROLONGATION

OF EDGE OF GUTTER LINE

DOUBLE SOLID YELLOW STRIPING

REPLACE

WHITELINE SAFTEY

CROSSWALK

ALVARADO
MARKET

REPLACE

STOP SIGN LEGEND

AND STRIPING
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
6x6

STEEL PLATE
W
WATER
METER
REPLACE 6 LOOPS
VARIES
12'
2'
2'

THERMOPLASTIC

Page 544 of 751 ends

342326 115
W. HARDING AVE.

N. 2ND ST.
314312 322312304112
399377363353
MADISON AVE.

CITY OF MONTEBELLO
Sheet 34 of 54
16a
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: N. & S. 2ND ST.

FROM: HARDING AVE.

TO: MADISON AVE.
1 2 6
S
JOIN
JOIN

YELLOW CROSSWALK

REPLACE CROSSWALK

WITH SAFETY SCHOOL

ZONE CROSSWALK
STOP

CROSSWALK
GUTTER

YELLOW CROSSWALK

REPLACE WITH SAFTETY CROSSWALK
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
W W

Page 545 of 751 ends

121
201241237233229227
116
MADISON AVE.

E. FREMONT SQUARE
221219209205 213203
117198
W. CLEVELAND AVE.

N. 2ND ST.

CITY OF MONTEBELLO
Sheet 35 of 54
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: N. & S. 2ND ST.

FROM: MADISON AVE.

TO: W. CLEVELAND AVE.
210
16b
1 2 6NOTE: RE-STRIPE
2 CROSSWALKS

WHITELINE
JOIN
STOP
S

CROSS GUTTER
RE-STRIPE ALL 4 CROSSWALKS

WITH SAFETY SCHOOL ZONE
YELLOW CROSSWALKS.

STOP
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
W
S

Page 546 of 751 ends

140136132128124120116
145137133125 129121117
112
113
W. CLEVELAND AVE.

W. WHITTER BLVD.

CITY OF MONTEBELLO
Sheet 36 of 54
16c
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: N. & S. 2ND ST.

FROM: W. CLEVELAND AVE.

TO: W. WHITTER BLVD AVE.

N. 2ND ST.
1 2 6
NOTE: RE-STRIPE ALL
4 WHITELINE

CROSSWALKS
ALLEY
1 1
ALLEY
S

DOUBLE YELLOW SOLID LINE

REPLACE

TRAFFIC LOOPS
S
W
S
STOP
JOIN

CROSSWALK
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

Page 547 of 751 ends

CITY OF MONTEBELLO
Sheet 37 of 54
16d
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: N. & S. 2ND ST.

FROM: W. WHITTER BLVD.

TO: LOS ANGELES AVE.
112116120124
113119121123
119
W. WHITTER BLVD.
128130136140
129135137141
144
204
LOS ANGELES AVE.

N. 2ND ST.
1 2 6
CROSS
GUTTER
STOP
W

CONCRETE
CROSS
GUTTER

DOUBLE SOLID

YELLOW LINE

REPLACE

TRAFFIC
LOOPS
WHITE
LINE
JOIN
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
7 PROTECT IN PLACE
JOIN EX. PAVEMENT
JOIN
JOIN

CROSSWALK

Page 548 of 751 ends

CITY OF MONTEBELLO
Sheet 38 of 54
17a
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: N. GREENWOOD AVE.

FROM: W. CLEVELAND AVE.

TO: W. WHITTER BLVD.
1015
149
144142138132128124122116112
1451411491331291251271171100
W. CLEVELAND AVE.

N. GREENWOOD AVE.ALLEY
ALLEY

REPLACE
GUTTER

CROSS WALK

YELLOW LINE

REPLACE WITH

LADDER SAFETY

CROSSWALK
STOPS
1 2 6
113
S
RE-STRIPE ALL 4 SINGLE LIINE

YELLOW CROSSWALKS

WITH THERMOPLASTIC

DOUBLE SOLID

YELLOWLINE
W W

RE-STRIPE ALL
4 WHITELINE

CROSSWALKS
W. WHITTER BLVD.

W
STOP
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
W
NO GUTTER ??
TALK TO ??
JOIN
JOIN

STREET HAS CURB ONLY

Page 549 of 751 ends

CITY OF MONTEBELLO
Sheet 39 of 54
17b
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: N. GREENWOOD AVE.

FROM: W. WHITTER BLVD.

TO: W. LOS ANGELES AVE.
112116120 1015124128132148
1109149 145 141 137
W. WHITTER BLVD.W. LOS ANGELES AVE,
N. GREENWOOD AVE.
1 2 6

CROSS WALK

YELLOW LINE
CROSS
GUTTER

CROSS WALK

DOUBLE SOLID

YELLOW CENTERLINE

ENTIRE SECTION

RE-STRIPE ALL
4 SINGLE WHITELINE

CROSSWALKS OF

INTERSECTION
JOINS
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

W W W W
S
F.H.

SUPERIOR

GROCERS

Page 550 of 751 ends

CITY OF MONTEBELLO
Sheet 40 of 54
17c
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: N. GREENWOOD AVE.

FROM: W. CLEVELAND AVE.

TO: W. OLYMPIC BLVD.
204210214216220224230232238240
2052092132172212252292332372411100
W. LOS ANGELES AVE,W. OLYMPIC BLVD.

N. GREENWOOD AVE.
1 2 6

CROSS WALK
JOIN
S
STOP

CROSS GUTTER
JOIN

RE-STRIPE ALL
4 SINGLE WHITELINE

CROSSWALKS
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
F.H.
4 LOOPS 7

Page 551 of 751 ends

CITY OF MONTEBELLO
Sheet 41 of 54
18 NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: CALIFORNIA AVE.

FROM: W. WHITTER BLVD.

TO: LOS ANGELES AVE.
107113117121125129135137141145
144 140 138 132 130 124 122 118 112
109
W. WHITTER BLVD.

CALIFORNIA AVE.

W. LOS ANGELES AVE.
1 2 6
S S
W
JOIN

PAVEMENT

DOUBLE YELLOW

CENTERLINE
CROSS
GUTTER
STOP
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
2 LOOPS
W
W
W
RESTRIPE ALL 4 SIDES

WITH YELLOW SAFETY

CROSSWALKS

SCHOOL ZONE

Page 552 of 751 ends

CITY OF MONTEBELLO
Sheet 42 of 54
19 NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: THYNNE ST.

FROM: FERGUSON DR.

TO: END
1833 1823
509
511 512
508
THYNNE ST.

FERGUSON DR.
1 2
S
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
W
CROSS
GUTTER

Page 553 of 751 ends

CITY OF MONTEBELLO
Sheet 43 of 54
20 NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: JOYCE ST.

FROM: FERGUSON DR.

TO: END
2101 1909
509
513 510
506
JOYCE ST.

FERGUSON DR.
1 2
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
CROSS
GUTTER
W

Page 554 of 751 ends

CITY OF MONTEBELLO
Sheet 44 of 54
21 NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: WORK ST.

FROM: FERGUSON DR.

TO: END
2201 2113
509
513 512
508
WORK ST.

FERGUSON DR.
1 2
S
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
CROSS
GUTTER

Page 555 of 751 ends

CITY OF MONTEBELLO
Sheet 45 of 54
22 NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: HORNBY ST.

FROM: FERGUSON DR.

TO: END
2217 2215
509
515 512
508
HORNBY ST.

FERGUSON DR.
1 2
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
CROSS
GUTTER

Page 556 of 751 ends

CITY OF MONTEBELLO
Sheet 46 of 54
22b
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: STORE ST.

FROM: FERGUSON DR.

TO: END
1901 1845
509
513
512
STORE ST.

FERGUSON DR.
1 2

JOIN PAVEMENT
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

HANDHOLE

Page 557 of 751 ends

CITY OF MONTEBELLO
Sheet 47 of 54
22c
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: THURLOW ST.

FROM: FERGUSON DR.

TO: END
1901 1845
509
513
512
THURLOW ST.

FERGUSON DR.
1 2

CROSS GUTTER
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
W

Page 558 of 751 ends

CITY OF MONTEBELLO
Sheet 48 of 54
23a
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: HEREFORD DR.

FROM: PICKERING WAY
TO: S. CONCOURSE AVE.
1418 2220 2216 2212 2208 2204 2200 2120 2116
21172121220122032209221322172221
1502
S. CONCOURSE AVE.

HEREFORD DR.

A
A
S
1 2 6
STOP
CROSS
GUTTER
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
S

Page 559 of 751 ends

CITY OF MONTEBELLO
Sheet 49 of 54
23b
NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: HEREFORD DR.

FROM: PICKERING WAY
TO: S. CONCOURSE AVE.
2112 2108 2104
2100
2032
2028
2026
2020
2016
2012
2008
337
345
2009
2013
2017
2021
2025
2029
2033
2037
2041
2101210521092113
A
A
HEREFORD DR.

PICKERING WAY
1 2 6
S
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
W
S

JOIN PAVEMENT
STOP

Page 560 of 751 ends

CITY OF MONTEBELLO
Sheet 50 of 54
24 NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: DATE ST.

FROM: S. GREENWOOD AVE
TO: SPRUCE ST.
856 848 844
1201849853
8621160
S. GREENWOOD AVE.

DATE ST.

S.SPRUCE ST.

S1 2 6
WW S
JOIN

PAVEMENT

RE-STRIPE
ALL 4

WHITE LINE

CROSS WALKS
STOP
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
3 LOOPS
S
W
PAVE

INTERSECTION

Page 561 of 751 ends

CITY OF MONTEBELLO
Sheet 51 of 54
25 NORTH
SCALE: NTS
SBI 2025-2026 STREET REHAB
STREET: S. SPRUCE ST.

FROM: DATE ST.

TO: OAKWOOD ST.
1200120212121216122012241228123212401244124612521260
900 1247 1239 12331235 1231 12251229 1221 1217 1213 1209 S. SPRUCE ST.

DATE ST.OAKWOOD ST.

W
S
1 2 6
JOIN

PAVEMENT
STOP
STOP
JOIN

PAVEMENT
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
S S

Page 562 of 751 ends

CITY OF MONTEBELLO
Sheet 52 of 54
26 NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: OAKWOOD ST.

FROM: SPRUCE ST.

TO: S. GREENWOOD AVE
901905907909917921
9009149189209241256
OAKWOOD ST.

SPRUCE ST.GREENWOOD AVE.
1 2 6

HANDICAP SPACE & BLUE CURB

TRAFFIC
LOOPS

RE-STRIPE

WHITE LINE

CROSS WALKS

DOUBLE SOLID

YELLOW LINE

CROSSWALK
GUTTER
STOP

CROSSWALK
GUTTER
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
S
W
W

Page 563 of 751 ends

CITY OF MONTEBELLO
Sheet 53 of 54
27 NORTH
SCALE: NTS
SB1 2025-2026 STREET REHAB
STREET: CAROB WAY
FROM: E. WASHINGTON BLVD.

TO: JACMAR DR.
900908
901915
918
917919
920519930934
925935 933939 937
709

CAROB WAY
JACMAR DR.E. WASHINGTON BLVD.
932 ROBERT J. KING JR. CT.

CROSSWALK
GUTTER

CROSSWALK
GUTTER
STOP
S
W
W
1 2 6
1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD

HANDICAP SPACE & BLUE CURB
JOIN
JOIN

Page 564 of 751 ends

CITY OF MONTEBELLO
Sheet 54 of 54
28 1 Cold mill existing AC pavement to 2” depth
2 Furnish and construct 2” thick ARHM overlay
or 3 Adjust existing water valve cover and frame to finished grade or 4 Adjust existing sewer manhole cover and frame to finished grade or 5 Adjust existing storm drain manhole cover and frame to finished grade 6 Restripe all existing pavement markings and replace same with thermoplastic.
7 Remove old loops and furnish and install traffic signal loop detectors and connect to DLC
8 Remove existing speed humps and install new per City standards CONSTRUCTION NOTES:

W
S
SD
SB1 2025-2026 STREET REHAB
STREET: S. GREENWOOD AVE.

FROM: SYCAMORE ST.

TO: END
1456
1448
1434
1432
1428
1424
NORTH
SCALE: NTS
SYCAMORE ST.

S. GREENWOOD AVE.
1 2
6 STOP
JOIN
WW
S S
S
W
S
S

Page 565 of 751 ends

APPENDIX “B”

LIST OF STANDARD PLANS

1. Sample Project information sign

2. Speed hump detail

3. Speed hump ahead sign

4. Speed hump arrow sign

5. Speed hump sign 15 mph

6. Crosswalk striping

7. Pavement markings traffic lines No 1

8. Pavement markings traffic lines No 2

9. Sewer manhole adjustment

10. Manhole raising rings

11. Water purveyors’ area map

12. Street locations map

Page 566 of 751 ends

APPENDIX C

SAMPLE PROJECT INFORMATION SIGN

THE FOLLOWING MINIMUM INFORMATION IS REQUIRED
ON EACH SIGN POSTED FOR LANE/ROAD CLOSURE:

FROM <DATE> TO <DATE>

USE ALTERNATE
ROUTE

FOR DETOUR
Permitt No.

MINIMUM SIGN DESIGN

BETWEEN
<STREET NAME> TO <STREET NAME>
REHABILITATION OF <ST. NAME>

Page 567 of 751 ends
Page 568 of 751 ends
Page 569 of 751 ends
Page 570 of 751 ends
Page 571 of 751 ends
Page 572 of 751 ends
Page 573 of 751 ends
Page 574 of 751 ends
Page 575 of 751 ends
Page 576 of 751 ends
Page 577 of 751 ends
Page 578 of 751 ends

APPENDIX “C”

DEPARTMENT OF INDUSTRIAL RELATIONS (DIR)

CONTRACTOR REGISTRATION NUMBER FORM

Page 579 of 751 ends

Department of Industrial Relations (DIR)
Contractor Registration Number
Beginning July 1, 2014, contractors must register with the Department of Industrial Relations (DIR) before bidding on public works contracts in California. For more information, please refer to this section of the Department of Industrial Relations Website:
http://www.dir.ca.gov/Public-Works/PublicWorks.html.

Per this requirement, provide the following information:

Contractor Name

Contractor Department of Industrial Relations Registration Number:

Expiration Date of Registration Number

*(THIS FORM MUST BE SUBMITTED WITH THE SEALED BID) *

Page 580 of 751 ends

APPENDIX “D-1 & D-2”
CONC
RETE

Page 581 of 751 ends

ヽ ′
V
ヽ
▼

APPENDIX C
ヽ
V

Page 582 of 751 ends

V
V
The document is a report by the American Concrete lnstitute (ACl) thatdiscusses the causes, evaluation, and repair methods for cracks in concrete structures.

Causes and Control of Cracking in Concrete
This section outlines the various causes of cracks in concrete andmethods to control them. . Cracks can occur in both plastic and hardened concrete.o Plastic shrinkage cracking is caused by rapid moisture loss, leading to tensile stresses and shallow cracks.. Settlement cracking occurs due to local restraint during consolidation, influenced by bar size, slump, and cover. . Drying shrinkage in hardened concrete can lead to cracks due to moisture loss, with a shrinkage potential of up to 1%o. o Thermal stresses arise from temperature differentials, causing tensile stresses that can lead to cracking.
o Chemical reactions, such as alkali-silica reactions, can cause expansive reactions and cracking.
o Weathering processes, including freezing and thawing, can damage concrete and lead to cracking.
. Corrosion of reinforcement can cause Iocat radial cracks due to volume expansion from rust formation.
o Poor construction practices, such as adding excess water, can lead to increased cracking.
o Construction overloads can induce severe stresses, resulting in permanent cracks.

Evaluation of Cracking in Concrete
This section discusses the evaluation techniques for assessing cracks in concrete structures.
. Evaluation involves determining the tocation and extent of cracks.
. Proper selection of repair procedures is crucial based on the evaluation findings.
. Techniques for evaluation include visual inspection and measurement of crack width and depth.

Methods of Crack Repair in Concrete
This section details various methods available for repairing cracks in

Page 583 of 751 ends

V
concrete structures.
o Epoxy injection is a common method for repairing cracks.o Routing and sealing can be used to address surfice cracks.o Stitching and additional reinforcement can provide structural support.
o Drilling and plugging, gravity filling, and grouting are also effective repair techniques.
o Drypacking and crack arrest methods can be employed for specific types of cracks.
. Polymer impregnation and surface treatments can enhance durability and appearance.
o Autogenous healing is a natural process that can occur in some concrete mixes.

Summary and Acknowledgments
This section summarizes the report and acknowledges contributions. o The report provides guidance on the causes, evaluation, and repair of cracks in concrete.
o Acknowledgments are given to committee members and
contributors involved in the report,s preparation.
. The document serves as a resource for practitioners in the field of concrete construction.

Effects of Construction Loads on Concrete
ln cold climates, construction loads can unintentionally affect cast_in_ place concrete due to heating practices.
o Heaters should be positioned away from exterior concrete members to prevent high thermal gradients.
. High thermal gradients can lead to localized drying shrinkage and carbonation cracking.
o Construction activities can impose loads that exceed design limits, necessitating strict control to avoid overloads. . Designers must provide load limitations, and construction personnel must adhere to these guidelines.

Design and Detailing Errors in Concrete
lmproper design and detailing can lead to various issues in concrete structures, from aesthetic problems to catastrophic failures. o Common errors include poorly detailed reentrant corners, inadequate reinforcement, and lack of contraction joints.

Page 584 of 751 ends

ヽ _´
. High-stress concentrations near reentrant corners can initiate cracks, especially in window and door openings.o lnsufficient reinforcement in nonstructurat members can lead toexcessive cracking under load. o Properly designed walls should have contraction joints spaced 1 to 3 times the wall height to accommodate volume changes.

Externally Applied Loads and Cracking
Load-induced tensile stresses are a well-known cause of cracking in concrete members.
. Crack width increases with higher steel stress, cover thickness, and concrete area surrounding reinforcing bars.
o The most significant variable affecting crack width is steel stress.
o A simplified equation predicts maximum surface crack width in bending: w = 0.076 x (ratio) x (steel stress) x (cover thickness) x (area).
o ACI 318 limits crack widths to 0.016 in. for interior exposure and

0.013 in. for exterior exposure.

Evaluation of Cracking in Concrete
ldentifying the cause and extent of cracking is crucial before repairs are made.
. Cracks should be evaluated to determine if they indicate current or future structural problems.
o Observations, drawings, and construction records should be reviewed to assess the situation.
. Cracks that impair strength, stiffness, or durability require repair, especially in water-retaining structures.
o Monitoring crack movement and using nondestructive testing can provide insights into the condition of the concrete.

Selection of Repair procedures for Cracks
Repair methods should be chosen based on the evaluation of cracking causes and desired outcomes.
o Objectives of repairs may include restoring strength, improving watertightness, or enhancing appearance.
. Epoxy injection can restore tensile strength across cracks, but the underlying cause must be addressed.
. Routing and sealing is a simpler method for non-structural

Page 585 of 751 ends

` 中/
ー
repairs, while stitching can reestablish tensile strength.o Additional reinforcement may be necessary for significant cracks, and post-tensioning can close cracks effectively.

Methods of Grack Repair in Concrete
Various techniques exist for repairing cracks, each suited for specific conditions and types of cracks.
. Epoxy injection is effective for cracks as narrow as O.OO2 in. but requires careful execution.
. Routing and sealing involves enlarging cracks and filling them with sealant, suitable for flat surfaces.
o Stitching uses U-shaped metal units to span cracks, enhancing tensile strength.
o Chemical grouting can fill very fine cracks, while drypacking is used for dormant cracks with low water content.

Autogenous Healing in Concrete
Autogenous healing is a natural process that can repair cracks in moist environments.
o Healing occurs through continued cement hydration and carbonation of calcium hydroxide.
. Saturation of cracks with water is essential for effective healing. o Healing is ineffective if cracks are active or subjected to movement during the healing period.

Summary of Crack Evaluation and Repair
The report serves as a guide for evaluating and repairing cracks in concrete structures.
o lt emphasizes the importance of understanding the causes of cracking before selecting repair methods.
. Twelve repair techniques are presented, each with specific advantages and applications.
o The report highlights the need for carefut evaluation and selection of repair procedures based on desired outcomes.

Cracks in Concrete and Their Detection
This section discusses various studies and methods related to the detection and analysis of cracks in concrete structures. o Kelly (1981) explores the nature of cracks in concrete, providing insights into their causes and implications.
o Knab et al. (1983) evaluate the use of ultrasonics for detecting cracks, highlighting its effectiveness in laboratory settings. ー

Page 586 of 751 ends

V
o Price (1982) addresses the control of cracking during construction, emphasizing preventive measures.

Curing Methods and Their lmpact
This topic covers different curing techniques and their effects on concrete properties.
o Kirkbrid e (1971a, 1gl1b) reviews accelerated curing procedures and discusses burner curing methods.
. Mansfield (1948) presents curing as a thermodynamic problem, indicating its complexity.
. Nurse (1949) examines steam curing, detailing its benefits and applications in concrete production.

Repair Techniques for Cracked Concrete
This section outlines various methods for repairing cracked concrete, focusing on innovative materials and techniques.
. Rodler et al. (1989) discuss the use of high molecular weight methacrylates for repairing cracks.
. Stratton et al. (1978) detail epoxy injection and rebar insertion as effective repair strategies for cracked structural concrete. . Smith (1992) investigates epoxy injection for bridge deck delaminations, showcasing its practical applications.

Durability and Performance of Concrete Structures
This topic addresses the durability of concrete, particularly in bridge decks and other critical structures.
. NCHRP Synthesis of Highway practice No. 57 (1979) focuses on the durability of concrete bridge decks, providing insights into common issues.
. Verbeck (1975) discusses corrosion mechanisms of steel in concrete, emphasizing the importance of protective measures. . Webster et al. (1978) explore bridge deck impregnation techniques in Texas, highlighting their effectiveness in enhancing durability.

Advances in Concrete Testing Methods
This section highlights advancements in non-destructive testing methods for concrete evaluation.
o Malhotra and Carino (1991) compile a handbook on
nondestructive testing, serving as a comprehensive resource. o Sansalone and Carino (1988, 1g8g) study the impact-echo method for flaw detection, demonstrating its utility in both ヽヽ ´

Page 587 of 751 ends

L
ヽノ
laboratory and field settings.
o Shideler and Toennies (1963) investigate plant drying and carbonation of concrete blocks, contributing to the
understanding of concrete properties.

U

Page 588 of 751 ends

ACI 224.1R-93
Causes, Evaluation and Repair of
Reapproved 1998
Cracks in Concrete Structures
Reported by AC I Committee 224
Grant T.

H&orsen*t
Chairman
Randall W. Poston
Secretary
Peter
Barlowt
Florian
Bartht
Alfred G. Bishara*
Howard L Boggs
Merle E.

Brandee
David
Darwin*
Fouad H. Fouad
David W.

Fowlerg
Peter Gergely*
Wii Hansen
M. Nadim H a s s o u n
Tony C.

Iiu$
Edward G. Nawy
Harry M. Palmbaum
Keith A. Pashina
Andrew
Scanlon$
Ernest K. Schrader
Wimal Suaris
Lewis H. Tuthill
Zenon A. Zielinski
* Contributing Author
t M e m b e r o f T a s k G r o u p w h i c h p r e p a r e d t h e s e r e v i s i o n s $ P r i n c i p a l A u t h o r
0 C h a i r m a n o f T a s k G r o u p w h i c h p r e p a r e d t h e s e r e v i s i o n s Note: Associate members Masayatsu Ohtsu, Robert L. Yuan, a n d C o n s u l t i ng Member LeRoy Lutz contribute to the revision of this document.

The causes of cracks in concrete structures are summarized The proce- dures used to evaluate cracking in concrete and the principal techniques for the repair of cracks are presented The key methods of crack repair are discussed and guidance is provided for their proper application Keywords: autogenous healing; beams (supports); cement-aggregate reactions; concrete construction; concrete pavements; concrete slabs; concretes; consol- idation; corrosion; cracking (fracturing); drilling; drying shrinkage; epoxy resins; evaluation; failure; grouting, heat of hydration; mass concrete; methacrylates; mix proportioning; plastics, polymers and resins; precast concrete; prestressed concrete; reinforced concrete; repairs;resurfacing; sealing settlement (structural); shrinkage; specifications; structural design; tension; thermal expansion; volume change.

CON TEN TS
Preface, pg. 224.1R-1
Chapter 1-Causes and control of cracking, pg . 224.1R-2

1.1-Introduction

1.2-Cracking of plastic concrete

1.3-Cracking of hardened concrete
ACI C o m m i t t e e R e p o r t s , G u i d e s , S t a n d a r d P r a c t i c e s , a n d Commentaries are intended for guidance in designing, plan- ning, executing, or inspecting construction and in preparing specifications. References to these documents shall not be made in the Project Documents. If items found in these
documents are desired to be a part of the Project Docu- ments, they should be phrased in mandatory language and incorporated into the Project Documents.

Chapter 2-Evaluation of cracking, pg. 224.1R-9

2.1-Introduction

2.2-Determination of location and extent of concrete
cracking

2.3-Selection o f r e p a i r p r o c e d u r e s
Chapter 3-Methods of crack repair, pg. 224.1R-13

3.1-Introduction

3.2-Epoxy injection

3.3-Routing and sealing

3.4-Stitching

3.5-Additional reinforcement

3.6-Drilling and plugging

3.7-Gravity filling

3.8-Grouting

3.9-Drypacking

3.10-Crack arrest

3.11-Polymer impregnation

3.12-Overlay and surface treatments

3.13-Autogenous healing
AC1 224.1R-93 s u p e r s e d e s A C I 224.1R-90 a n d b e c a m e e f f e c t i v e S e p t e m b e r 1 , 1993.

Copyright
d 1 9 9 3 , A m e r i c a n C o n c r e t e I n s t i t u t e .

All rights reserved including rights of reproduction and use in any form or by any means, including the making of copies by any photo process, or by any elec- tronic or mechanical devices, printed or written or oral, or recording for sound or visual reproduction or for use in any knowledge or retrieval s y s t e m o r d e v i c e , unless p e r m i s s i o n i n w r i t i n g i s o b t a i n e d f r o m t h e c o p y r i g h t p r o p r i e t o r s . 224.1R-l

Page 589 of 751 ends

224.1R-2 ACI COMMITTEE REPORT
Chapter 4-Summary, pg. 224.lR-19
Acknowledgment, pg. 224.1R-19
Chapter 5-References, pg. 224.1R-20

5.1-Recommended r e f e r e n c e s

5.2-Cited r e f e r e n c e s

PREFACE
Cracks in concrete have many causes. They may affect
appearance only, or they may indicate significant struc- tural distress or a lack of durability. Cracks may repre- sent the total extent of the damage, or they may point to problems of greater magnitude. Their significance de-
pends on the type of structure, as well as the nature of the cracking. For example, cracks that are acceptable for buildings may not be acceptable in water-retaining struc- tures.

The proper repair of cracks depends on knowing the
causes and selecting the repair procedures that take these causes into account; otherwise, the repair may only be
temporary. Successful long-term repair procedures must
attack the causes of the cracks as well as the cracks
themselves.

To aid the practitioner in pinpointing the best solution to a cracking problem, this report discusses the causes, evaluation procedures, and methods of repair of cracks
in concrete. Chapter 1 presents a summary of the causes of cracks and is designed to provide background for the evaluation of cracks. Chapter 2 d e s c r i b e s e v a l u a t i o n t e c h - niques and criteria. Chapter 3 describes the methods of crack repair and includes a discussion of a number of
techniques that are available. Many situations will require a combination of methods to fully correct the problem.

Preface to the 1991 Revision
Following the initial publication o f ACI 224.1R in
1985, the Committee processed two minor revisions. One
revision, published a s ACI 224.lR-89 s i m p l y u p d a t e d t h e format of recommended references. A second minor revi-
sion contained minor technical revisions and editorial
corrections in the document, and added a new section to Chapter 3, regarding the use of high-molecular-weight
methacrylates as sealer/healers.

During 1990 a Committee 224 Task Croup reviewed
the document and recommended the revisions contained
herein. Chapter 1 has been altered in only minor detail.

The introduction to Chapter 2 has been revised exten-
sively, and additional minor revisions have been made to the rest of the Chapter. In Chapter 3 , the section on
routing and sealing has been rewritten to include flexible sealing and overbanding of cracks, and it is updated to reflect current materials and construction practices. Sec- tion 3.2 on epoxy injection has been revised to be some- what more general and reflect current practice. The
for-
mer section on high-molecular-weight methacrylates has
been moved to Section 3.7 and retitled “Gravity Filling.” This recognizes the point that “high-molecular-weight
methacrylate” is a material, and not a method. Refer-
ences are presented in Chapter 5; citations throughout
the text have been revised to employ the author/date
format. Several new references have been added.

Additional revision of the report is ongoing. Commit-
tee 224 invites comment from the readers and users of
this report on new developments, or alternate viewpoints on the
Causes, Evaluation, and Repair of Crack s in Con-
crete Structures.

CHAPTER 1-CAUSES AND CONTROL

OF CRACKING

1.1-Introduction
This chapter presents a brief summary of the causes of
cracks and means for their control. Cracks are categor- ized as occurring either in plastic concrete or hardened concrete (Kelly 1981; Price 1982) . In addition to the in- formation provided here, further details are presented in ACI 2 2 4 R a n d a r t i c l e s by Carlson et al . (1979), K e l l y (1981), Price (1982),, and Abdun-Nur (1983). Additional references are cited throughout the chapter.

1.2-Cracking of plastic concrete

1.2.1 Plastic s h r i n k a g e cracking -"Plastic s h r i n k a g e cracking ( Fig. 1.1 ) occurs...when subjected to a very rapid loss of moisture caused by a combination of factors which include air and concrete temperatures, relative
humidity, and wind velocity at the surface of the con-
crete. These factors can combine to cause high rates of surface evaporation in either hot or cold weather.”
When moisture evaporates from the surface of freshly
placed concrete faster than it is replaced by bleed water, the surface concrete shrinks. Due to the restraint pro- vided by the concrete below the drying surface layer, ten- sile stresses develop in the weak, stiffening plastic con- crete, resulting in shallow cracks of varying depth which ----
Fig. 1.1-Typica l plastic shrinkage cracking (Price 1982)

Page 590 of 751 ends

CAUSES, EVALUATION AND REPAIR OF CRACKS 224.1R-3
Fig. 1.2-Crack formed due to obstructed settlement (Price 1982)
80 60
40 20
Bar Size
~~
\Slump
0 I
I
I
I
’Cover
(19mm) 1” (25mm) 1 1/2" (38mm) 2” (51mm)
Bar Size : No.4 (13mm) No.5 (16mm) No.6 (19mm)
Slump: 2 ” (51mm) 3” (76mm) 4” (102mm)
Fig. 1.3-Settlement cracking as a function of bar size, slump and cover (Dakhil et al. 1975)
may form a random, polygonal pattern, or may appear as
essentially parallel to one another. These cracks are often fairly wide at the surface. They range from a few inches to many feet in length and are spaced from a few inches to as much as 10 ft (3 m) apart. Plastic shrinkage cracks begin as shallow cracks but can become full-depth cracks.

Since plastic shrinkage cracking is due to a differential volume change in the plastic concrete, successful control measures require a reduction in the relative volume
change between the surface and other portions of the
concrete.

Steps can be taken to prevent a rapid moisture loss
due to hot weather and dry wind s (ACI 224R, ACI
302.1R, ACI 3 0 5 R ) . T h e s e m e a s u r e s i n c l u d e t h e u s e o f fog nozzles to saturate the air above the surface and the use of plastic sheeting to cover the surface between
finishing operations. Windbreaks to reduce the wind
velocity and sunshades to reduce the surface temperature are also helpful, and it is good practice to schedule flat work after the windbreaks have been erected.

1.2.2 Settlement cracking - After initial placement,
vibration, and finishing, concrete has a tendency to con- tinue to consolidate. During this period, the plastic con- crete may be locally restrained by reinforcing steel, a prior concrete placement, or formwork. This local re-
straint may result in voids and/or cracks adjacent to the restraining element ( Fig. 1.2). When associated with rein- forcing steel, settlement cracking increases with in-
creasing bar size, increasing slump, and decreasing cover (Dakhil et al. 1975). This is shown in Fig. 1.3 f o r a limited range of these variables. The degree of settlement cracking may be intensified by insufficient vibration or by the use of leaking or highly flexible forms.

Form design
(ACI 347R) and vibration (an d revibra-
tion), provision of a time interval between the placement of concrete in columns or deep beams and the placement
of concrete in slabs and beam s
(ACI 309.2R), the use of
the lowest possible s l u m p , a n d a n i n c r e a s e i n c o n c r e t e cover will reduce settlement cracking.

1.3-Cracking of hardened concrete

1.3.1 Drying shrinkage -A common cause of cracking
in concrete is restrained drying shrinkage. Drying
shrinking is caused by the loss of moisture from the
cement paste constituent, which can shrink by as much as 1 percent. Fortunately, aggregate provides internal re- straint that reduces the magnitude of this volume change to about 0.06 percent. On wetting, concrete tends to
expand.

These moisture-induced volume changes are a charac-
teristic of concrete. If the shrinkage of concrete could take place without restraint, the concrete would not
crack. It is the combination of shrinkage and restraint (usually provided by another part of the structure or by the subgrade) that causes tensile stresses to develop.

When the tensile strength of concrete is exceeded, it will crack. Cracks may propagate at much lower stresses than are required to cause crack initiation.

In massive concrete elements, tensile stresses are
caused by differential shrinkage between the surface and the interior concrete. The larger shrinkage at the surface causes cracks to develop that may, with time, penetrate deeper into the concrete.

The magnitude of the tensile stresses induced by vol-
ume change is influenced by a combination of factors, in- cluding the amount of shrinkage, the degree of restraint, the modulus of elasticity, and the amount of creep. The amount of drying shrinkage is influenced mainly by the
amount and type of aggregate and the water content of
the mix. The greater the amount of aggregate, the
smaller the amount of shrinkag e (Pickett 1 9 5 6 ) . T h e higher the stiffness of the aggregate, the more effective it is in reducing the shrinkage of the concre te (i.e., the shrinkage of concrete containing sandstone. aggregate
may be more than twice that of concrete with granite,

Page 591 of 751 ends

2 2 4.1 R-4 A C I C O M MI T T E E R E P O R T
basalt, or limestone (Carlson 1 9 3 8 ) ) . T h e h i g h e r t h e water content, the greater the amount of drying shrink- age (U.S. Bureau of Reclamation 1975).

Surface crazing (alligator pattern) on walls and slabs
is an example of drying shrinkage on a small scale.

Crazing usually occurs when the surface layer of the
concrete has a higher water content than the interior
concrete. The result is a series of shallow, closely spaced, fine cracks.

Drying shrinkage can be reduced by increasing the
amount of aggregate and reducing the water content. A
procedure that will help reduce settlement cracking, as well as drying shrinkage in walls, is reducing the water content of the concrete as the wall is placed from the
bottom to the top. Using this procedure, bleed water
from the lower portions of the wall will tend to equalize the water content within the wall. To be successful, this procedure needs careful control of the concrete and pro- per consolidation.

Shrinkage cracking can be controlled by using contrac-
tion joints and steel detailing. Shrinkage cracking may also be reduced by using shrinkage-compensating cement.

The reduction or elimination of subslab restraint can also be effective in reducing shrinkage cracking i n slabs-on- grade (Wimsatt et al. 1987). In cases where crack control is particularly important, the minimum requirements of
ACI 318 are not always adequate. These points are dis- cussed in greater detai l iu ACI 224R, which describes additional construction practices designed to help control the drying shrinkage cracking that does occur, and in
ACI 224.3R, w h i c h d e s c r i b e s t h e u s e a n d f u n c t i o n o f joints in concrete construction.

1.3.2 Thermal stresses-Temperature differences within
a concrete structure may be caused by portions of the
structure losing heat of hydration at different rates or by the weather conditions cooling or heating one portion of the structure to a different degree or at a different rate than another portion of the structure. These temperature differences result in differential volume changes. When the tensile stresses due to the differential volume changes exceed the tensile stress capacity, concrete will crack. The effects of temperature differentials due to different rates of heat dissipation of the heat of hydratio n of cement are normally associated with mass concrete (which can in-
clude large columns, piers, beams, and footings, as well as dams), while temperature differentials due to changes in the ambient temperature can affect any structure.

Cracking in mass concrete can result from a greater
temperature on the interior than on the exterior. The
temperature gradient may be caused by either the center of the concrete heating up more than the outside due to the liberation of heat during cement hydratio n or more rapid cooling of the exterior relative to the interior. Both cases result in tensile stresses on the exterior and, if the tensile strength is exceeded, cracking will occur. The ten- sile s t r e s s e s a r e p r o p o r t i o n a l t o t h e t e m p e r a t u r e d i f f e r - ential, the coefficient of thermal expansion, the effective modulus of elasticity (which is reduced by creep), and the degree of restraint (Dusinberre 1945; Houghton 1972,
1976). The more massive the structure, the greater the
potential for temperature differential and restraint.

Procedures to help reduce thermally-induced cracking
include reducing the maximum internal temperature, de-
laying the onset of cooling, controlling the rate at which the concrete cools, and increasing the tensile strength of the concrete. These and other methods used to reduce
cracking in massive concrete are presented in ACI
207.1R, ACI 207.2R, ACI 207.4R, and ACI 2 2 4 R .

Hardened concrete has a coefficient of thermal expan-
sion that may range from 4 to 9 x
lOA F (7 to 11 x 10”
C), with a typical value of 5.5 x
lOA F (10 x
lOA C).

When one portion of a structure is subjected to a tem-
perature-induced volume change, the potential for ther- mally-induced cracking exists. Designers should give spe- cial consideration to structures in which some portions are exposed to temperature changes, while other portions of the structure are either partially or completely pro- tected. A drop in temperature may result in cracking in the exposed element, while increases in temperature may cause cracking in the protected portion of the structure.

Temperature gradients cause deflection and rotation in
structural members; if restrained, serious stresses can result (Priestly 1978; Hoffman et al. 1983; ACI 343R).

Allowing for movement by using properly designed con-
traction joints and correct detailing will help alleviate these problems.

1.3.3 Chemical reaction-Deleterious chemical reac-
tions may cause cracking of concrete. These reactions
may be due to materials used to make the concrete or
materials that come into contact with the concrete after it has hardened.

Some general concepts for reducing adverse chemical
reactions are presented here, but only pretesting of the mixture or extended field experience will determine the effectiveness of a specific measure.

Concrete may crack with time as the result of slowly
developing expansive reactions between aggregate con-
taining active silica and alkalies derived from cement
hydration, admixtures, or external sources ( e.g., curing water, ground water, alkaline solutions stored or used in the finished structure.)
The alkali-silica reaction results in the formation of a swelling gel, which tends to draw water from other por- tions of the concrete. This causes local expansion and
accompanying tensile stresses, and may eventually result in the complete deterioration of the structure. Control measures include proper selection of aggregates, use of low alkali cement, and use o f pozzolans, w h i c h t h e m - selves contain very fine, h i g h l y a c t i v e s i l i c a s . T h e f i r s t measure may preclude the problem from occurring, while
the later two measures have the effect of decreasing the alkali to reactive silica ratio, resulting in the formation of a nonexpanding calcium alkali silicate.

Certain carbonate rocks participate in reactions with
alkalies which, in some instances, produce detrimental ex- pansion and cracking. These detrimental alkali-carbonate

Page 592 of 751 ends

CAUSES, EVALUATION AND REPAIR OF CRACKS 224.1R-5
reactions are usually associated with argillaceous
dolomitic limestones which have a very fin e grained
(cryptocrystalline) structure (ACI 201.2R). The affected concrete is characterized by a network pattern of cracks.

The reaction is distinguished from the alkali-silica
reaction by the general absence of silica gel surface
deposits at the crack. The problem may be minimized by
avoiding reactive aggregates, dilution with nonreactive aggregates, use of a smaller maximum size aggregate, and use of low-alkali cement (ACI 201.2R).

Sulfate-bearing waters are a special durability problem for concrete. When sulfate penetrates hydrated cement
paste, it comes in contact with hydrated calcium alumi- nate. Calcium sulfoaluminate is formed, with a subse-
quently large increase in volume, resulting in high local tensile stresses that lead to cracking which causes
development of closely spaced cracking and deteriora-
tion. ASTM C 1 5 0 T y p e s I I a n d V portland c e m e n t , which are low in tricalcium aluminate, will reduce the
severity of the problem. The blended cements specified
in ASTM C 595 are also useful in this regard. In severe cases, some pozzolans, known to impart additional resis- tance to sulfate attack, could be used after adequate
testing.

Detrimental conditions may also occur from the appli-
cation of deicing salts to the surface of hardened con- crete. Concrete subjected to water soluble salts should be amply air entrained, have adequate cover of the rein-
forcing steel, and be made of high-quality, low per-
meability concrete.

The effects of these and other problems relating to the durability of concrete are discussed in greater detail in ACI 201.2R.

The calcium hydroxide in hydrated cement paste will
combine with carbon dioxide in the air to form calcium
carbonate. Since calcium carbonate has a smaller volume than the calcium hydroxide, shrinkage will occur (com-
monly known as carbonation shrinkage). This situation
may resul t
in significant s u r f a c e c r a z i n g a n d m a y b e especially serious on freshly placed surfaces during the first 24 hours when improperly vented combustion
heaters are used to keep concrete warm during the
winter months.

With the exception of surface carbonation, very little
can be done to protect or repair concrete that has been subjected to the types of chemical attack described above (ACI 201.2R).

1.3.4 Weathering-The weathering processes that can
cause cracking include freezing and thawing, wetting and drying, and heating and cooling. Cracking of concrete
due to natural weathering is usually conspicuous, and it may give the impression that the concrete is on the verge of disintegration, even though the deterioration may not have progressed much below the surface.

Damage from freezing and thawing is the most com-
mon weather-related physical deterioration. Concrete
may be damaged by freezing of water in the paste, in the aggregate, or in both (Powers 1975).

Damage in hardened cement paste from freezing is
caused by the movement of water to freezing sites and by hydraulic pressure generated by the growth of ice crystals (Powers 1975).

Aggregate particles are surrounded by cement paste
which prevents the rapid escape of water. When the ag-
gregate particles are above a critical degree of saturation, the expansion of the absorbed water during freezing may crack the surrounding cement paste or damage the aggre- gate itself (Callan 1952; Snowdon and Edwards 1962).

Concrete is best protected against freezing and
thawing through the use of the lowest practica l water- cement ratio and total water content, durable aggregate, and adequate air entrainment. Adequate curing prior to
exposure to freezing conditions is also important. Allow- ing the structure to dry after curing will enhance its
freezing and thawing durability.

Other weathering processes that may cause cracking in
concrete are alternate wetting and drying, and heating
and cooling. Both processes produce volume changes that may cause cracking. If the volume changes are excessive, cracks may occur, as discussed in Sections 1.3.1 and 1.3.2.

1.3.5 Corrosion of reinforcement-Corrosion of a metal
is an electrochemical process that requires an oxidizing agent, moisture, and electron flow within the metal; a
series of chemical reactions takes place on and adjacent to the surface of the met al (ACI 201.2R).

The key to protecting metal from corrosion is to stop
or reverse the chemical reactions. This may be done by
cutting off the supplies of oxygen or moisture or by sup- plying excess electrons at the anodes to prevent the
formation of the metal ions (cathodic protection).

Reinforcing steel usually does not corrode in concrete
because a tightly adhering protective oxide coating forms in the highly alkaline environment. This is known as
passive protection.

Reinforcing steel may corrode, however, if the alka-
linity of the concrete is reduced through carbonation or if the passivity of this steel is destroyed by aggressive ions (usually chlorides). Corrosion of the steel produces iron oxides and hydroxides, which have a volume much great-
er than the volume of the original metallic iron (Verbeck 1975). This increase in volume causes high radial bursting stresses around reinforcing bars and results in local radial cracks. These splitting cracks can propagate along the
bar, resulting in the formation of longitudinal cracks (i.e., parallel to the bar) or spalling of the concrete. A broad crack may also form at a plane of bars parallel to a con- crete surface, resulting in delamination, a well-known
problem in bridge decks.

Cracks provide easy access for oxygen, moisture, and
chlorides, and thus, minor splitting cracks can create a condition in which corrosion and cracking ar e acceler- ated.

Cracks transverse to reinforcement usually do not
cause continuing corrosion of the reinforcement if the
concrete has low permeability. This is due to the fact that the exposed portion of a ba.r at a crack acts as an anode.

Page 593 of 751 ends