Cities Index.
Agenda

Monterey Park City Council
April 19, 2023

Document
Agenda
Meeting
April 19, 2023
Body
Monterey Park City Council
Pages
245
Original file
24.8 MB
Text extracted from the city's file for reading and search. Open the original on montereyparkca.api.civicclerk.com. That file is the official record.

CITY COUNCIL OF MONTEREY PARK

THE CITY COUNCIL ACTING ON BEHALF OF THE SUCCESSOR AGENCY OF THE FORMER

REDEVELOPMENT AGENCY, THE HOUSING AUTHORITY, THE MONTEREY PARK FINANCING

AUTHORITY AND THE MONTEREY PARK GEOLOGIC HAZARD ABATEMENT DISTRICT AGENDA

REGULAR CITY COUNCIL MEETING

MONTEREY PARK CITY HALL COUNCIL CHAMBERS
320 W. NEWMARK AVENUE, MONTEREY PARK, CA 91754
W
ednesday
April 19, 2023
6:30 p.m.

G

ENERAL INFORMATION
Documents related to an Agenda item are available to the public in the City Clerk’s Office located at 320 West Newmark Avenue, Monterey Park, CA 91754, during normal business hours and the City’s website at http://www.montereypark.ca.gov/AgendaCenter/City-Council-17.

The publ
ic may watch the meeting live on the city’s cable channel MPKTV (AT&T U -verse, channel 99 or Charter Communications, channel 182) or by visiting the city’s website at http://www.montereypark.ca.gov/133/City-Council-Meeting-Videos.

P

UBLIC PARTICIPATION
You may speak up to 5 minutes on Agenda item. You may combine up to 2 minutes of time with another person’s speaking. No person may speak more than a total of 10 minutes. The Mayor and City Council may change the amount of time allowed for speakers. Written Communication will be accepted up to 24 hours before the meeting via email to [email protected].

P
er the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please call City Hall at (626) 307-1359 for reasonable accommodation at least 24 hours before a meeting.

Council Chambers are wheelchair accessible.

CA
LL TO ORDER Mayor
FLAG SALUTE The Monterey Park Police Explorers
ROLL CALL Henry Lo, Vinh Ngo, Jose Sanchez, Thomas Wong, Yvonne Yiu A

GENDA ADDITIONS, DELETIONS, CHANGES AND ADOPTIONS

MISSION STATEMENT
The mission of the City of Monterey Park is to provide excellent services to enhance the quality of life for our entire community.

Page 1 of 245 ends

Monterey Park City Council Agenda, April 19, 2023 - Page 2

PUBLIC COMMUNICATIONS:

While all comments are welcome, the Brown Act does not allow the City Council to take action on any item not on the agenda. The Council may briefly respond to comments after Public Communications is closed. Persons may, in addition to any other matter within the City Council's subject-matter jurisdiction, comment on Agenda Items at this time. If you provide public comment on a specific Agenda item at this time, however, you cannot later provide comments at the time the Agenda Item is considered.

STAFF COMMUNICATIONS:
• Economic Development
• Fire Department
• Recreation and Community Services

[1.] PRESENTATION

1-A. MONTEREY PARK COMMUNITY HEALING FUND UPDATE

[2.] OLD BUSINESS

2-A.

RECEIVE AND FILE STAFF REPORT SUMMARIZING THE STATUS OF EMERGENCY

REPAIRS OF THE MONTEREY PASS ROAD WATER LINE
It is recommended that the City Council consider:
(1) Receive and f ile the staff report summarizing the status of emergency repairs of the Monterey Pass Road water line; and
(2) Taking such additional, related, action that may be desirable.

[3.] CONSENT CALENDAR ITEM NOS. 3A-3L

All items under the Consent Calendar are considered by the City Council to be routine and will be enacted by one motion. Specific items may be removed from the Consent Calendar at the request of any member of the City Council for separate consideration.

3-A. MONTHLY INVESTMENT REPORT – MARCH 2023
It is recommended that the City Council consider:
(1) Receiving and filing the monthly investment report; and (2) Taking such additional, related, action that may be desirable.

3-B. PROFESSIONAL MUNICIPAL CLERKS WEEK RESOLUTION
It is recommended that the City Council consider:
(1) Adopting a Resolution declaring the week of April 30 – May 6, 2023 as Professional Municipal Clerks Week in Monterey Park; and
(2) Taking such additional, related, action that may be desirable.

Page 2 of 245 ends

Monterey Park City Council Agenda, April 19, 2023 - Page 3

3-C. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MONTEREY PARK, CALIFORNIA DECLARING WEDNESDAY, APRIL 26, 2023 TO BE “DENIM DAY MONTEREY PARK”
It is recommended that the City Council consider:
(1) Adopting a resolution declaring Wednesday, April 26, 2023 as “Denim Day Monterey Park”; and
(2) Taking such additional, related, action that may be desirable.

3-D. NATIONAL CRIME VICTIMS’ RIGHTS WEEK RESOLUTION
It is recommended that the City Council consider:
(1) Adopting a Resolution Declaring the week of April 23 through 29, 2023 to be National Crime Victims’ Rights Week in the City of Monterey Park; and
(2) Taking such additional, related, action that may be desirable.

3-E. 2023 NATIONAL LIBRARY WEEK RESOLUTION
It is recommended that the City Council consider:
(1) Adopting a resolution declaring the week of April 23- 29, 2023 to be National Library Week in Monterey Park,
(2) Taking such additional, related, action that may be desirable.

3-F. CONTINUE TO EXTEND THE EXISTENCE OF AN EMPLOYMENT EMERGENCY FOR THE

CITY OF MONTEREY PARK
It is recommended that the City Council consider:
(1) Receiving and filing this report;
(2) Continuing to extend the existence of an employment emergency for the City of Monterey Park and authorizing the City Manager to take all practical actions needed to implement the efficient recruitment and retention of persons for employment; and (3) Taking such additional, related, action that may be desirable.

3-G.

CALIFORNIA STATE LIBRARY BUILDING FORWARD LIBRARY FACILITIES

IMPROVEMENT GRANT
It is recommended that the City Council consider:
(1) Adopting a resolution authorizing the City Manager, or designee, to apply for, receive, and appr
opriate grant funds for the California State Library Building Forward Library Facilities Improvement Grant
(2) Tak ing such additional, related, action that may be desirable.

Page 3 of 245 ends

Monterey Park City Council Agenda, April 19, 2023 - Page 4 3-H. TREE MEMORIAL PROGRAM RECOMMENDATION FOR 2023
It
is recommended that the City Council consider:
(1) Approving to honor Victoria Chavez-Calderon with a memorial tree; and (2) Taking such additional, related, action that may be desirable. 3-I. WAIVE FURTHER READING AND ADOPT ORDINANCES: 1) ZONE CHANGE (ZA -22-01)

TO RE -ZONE PROPERTIES FROM THE REGIONAL SPECIALTY CENTER (R- S) ZONE

WITH THE PLANNED DEVELOPMENT OVERLAY (P- D) ZONE TO THE MARKET PLACE SPECIFIC PLAN (MPSP) ZONE; AND 2) DEVELOPMENT AGREEMENT (DA -22-01) TO

AMEND IN ITS ENTIRETY A DEVELOPMENT AGREEMENT BETWEEN MONTEREY PARK

RETAIL PARTNERS, LLC AND THE CITY OF MONTEREY PARK FOR PROPERTIES

COLLECTIVELY OPERATING AS THE MONTEREY PARK MARKET PLACE, LOCATED AT 2300 GREENWOOD AVENUE AND 2000-5500 MARKET PLACE DRIVE, ALSO IDENTIFIED BY ASSESSOR’S PARCEL NUMBERS 5275-003-024, 025, 027, 029, 030, 031, 037, AND 038 It is recommended that the City Council consider:
(1) Waiving the second reading and adopting the proposed ordinances; and (2) Taking such additional, related, action that may be desirable. 3-J. CIP
96039 SIDEWALK REPAIR PROJECT – REJECT ALL SUBMITTED BIDS It is recommended that the City Council consider:
(1) Rejecting all submitted bids for Capital Improvement Project (CIP) No. 96039 – Sidewalk Repair Project;
(2) Taking such additional, related, action that may be desirable. 3-K. AMENDMENT TO AGREEMENT 1932 -A1 WITH SA ASSOCIATES FOR CENTRALIZED

GROUNDWATER TREATMENT SYSTEM
It is recommended that the City Council consider:
(1) Authorizing the City Manager to execute an Amendment to Agreement 1932- A1with SA Associates, in a form approved by the City Attorney, for Staffing Augmentation and Construction Management and Inspection Services for an amount not to exceed $497,080; (2) Appropriating $497,080 for the cost of services proposed in the Amendment ($336,000 in city Water Treatment funds and $161,280 in Water Operations funds); and (3) Taking such additional, related, action that may be desirable. 3-L. FREE SPIRIT BUS RIDES FOR EARTH DAY
It is recommended that the City Council consider:
(1) Waiving Spirit Bus fare for riders on Friday, April 21, 2023 in celebration of Earth Day; (2) Taking such additional, related, action that may be desirable.

Page 4 of 245 ends

Monterey Park City Council Agenda, April 19, 2023 - Page 5

[4.] PUBLIC HEARING – None.

[5.] NEW BUSINESS

5-A. CONSIDERATION AND POSSIBLE ACTION TO INTRODUCE AN ORDINANCE AMENDING TITLE 13, CHAPTER 12 OF THE MONTEREY PARK MUNICIPAL CODE (“MPMC”) IN ITS

ENTIRETY TO REGULATE ENCROACHMENTS WITHIN THE PUBLIC RIGHT-OF-WAY It is recommended that the City Council consider:
(1) Introducing and waiving first reading of an Ordinance amending Title 13, Chapter 12 of the Monterey Park Municipal Code (“MPMC”) in its entirety regulating encroachments into public streets, easements, and right of ways; and
(2) Taking such additional, related, action that may be desirable.

CEQA (California Environmental Quality Act):

This Ordinance was reviewed pursuant to CEQA. Adopting this Ordinance is exempt from further environmental review because it establishes rules and procedures for operation of existing facilities; minor temporary use of land; minor alterations in land use; new construction of small structures; and minor structures accessory to existing commercial facilities. The Ordinance, therefore, is categorically exempt from further environmental review under CEQA Guidelines §§ 15301; 15303, 15304(e); 15305; and 15311. Further, adopting the ordinance is exempt from environmental review pursuant to CEQA Guidelines § 15061(b)(3) because the ordinance is for general policies and procedure-making. It can be seen with certainty that there is no possibility that the Ordinance may have a significant effect on the environment. Individual projects utilizing these regulations will each be separately subject to an environmental assessment. Finally, this Ordinance is exempt from further environmental review pursuant to CEQA Guidelines § 15269(a) because the protection of public and private property is necessary to maintain service essential to the public, health and welfare.

[6.] CITY COMMUNICATIONS (CITY COUNCIL)

[7.] FUTURE AGENDA ITEMS

[8.] CLOSED SESSION (IF REQUIRED; CITY ATTORNEY TO ANNOUNCE)

ADJOURN

Page 5 of 245 ends

City Council Staff Report
DATE: April 19, 2023
AGENDA ITEM NO:

TO: The Honorable Mayor and City Council
FROM: Shawn Igoe, Director of Public Works
SUBJECT: Receive and File Staff Report Summarizing the Status of Emergency Repairs of the Monterey Pass Road Water Line
RECOMMENDATION:

It is recommended that the City Council consider:

1. Receive and File the staff report summarizing the status of emergency repairs of the Monterey Pass Road water line; and

2. Taking such additional, related, action that may be desirable.

BACKGROUND:

On August 17, 2022, City Council adopted Resolution No. 2022-R69 authorizing the City Manager to take necessary measures for emergency repair of a water main line on Monterey Pass Road. Recurring water main leaks in several areas within Monterey Pass Road between the intersections of Vagabond Drive and Brightwood street resulted in extensive infrastructure damage to the roadway and necessary water main pipe repairs to ensure continued water service to residences and businesses in the area.

On August 29, 2022, the City contracted with Cannon Corporation for professional engineering services to prepare design plans and specifications for the water pipeline replacement. Cannon provided the City with complete plans to replace the existing 12- inch water transmission line in December which was identified in the December 21, 2022 staff report update for this project.

Following the adoption of the emergency resolution, staff contacted potential contractors and identified Ferreira Coastal Construction (Ferreira) in September 2022 as a qualified contractor that also had the resources and availability for the construction phase of this project. Ferreira worked closely with the City and Cannon Corporation during the design phase to provide input on design, constructability, and material availability.

The design phase began with a field survey, potholing and research of underground infrastructure that affect the placement of the proposed piping system which took several months due to the existing infrastructure overlaps. Various design alternatives were studied to address conflicting utilities with the Southern California Edison substation underground electrical, storm drain lines and sewer mains which impacted the placement of the new water main. Additional research of available material and cost was conducted Old Business - 2A

Page 6 of 245 ends

Staff Report

Page 2 of 3 ends

April 19, 2023

during the months of December and January to ensure the project could be expedited due to the significant material delivery delays.

Design work of this type of project typically takes at least six mo nths to complete. Final design, however, was completed in under four months along with a final material list being developed, researched and evaluated, leading to an approximate reduction in four to six months of time for this project to be completed. By adopting the emergency resolution and reducing the typical timeline, impacts to essential services and damages to public and private property are being mitigated. The City received pricing and lead times for material from three vendors and worked with Ferreira to evaluate the City’s best option based on cost, lead time and availability of parts and material. Staff ordered the material required for the project in January and February 2023. Construction has now started and is scheduled to be complete by October 2023.

Typical emergency projects can be completed within a short period of time; this project is significantly different as there is approximately one-mile of 12-inch water main that failed in several locations and continues to see failure points. These failures led to businesses that operate around the clock to be left without essential public services during these repairs in addition to limited access to their businesses . These failures have led to significant damages to the roadway which require additional work and material to restore.

There were additional delays that impacted this project related to receiving material with the continued supply chain challenges that continue to impact projects such as this one.

Additionally, the recent rain has impacted construction citywide.

As part of the City’s outreach efforts, the construction manager visited business along the project area prior to the start of the project to notify them of the upcoming construction.

The Economic Development Division also mailed out letters to businesses that may be impacted by this project. Message boards were placed within the project area before construction to alert drivers of the impact to their commutes. The City will continue to provide project updates to the community for the duration of the project through the City website, social media, and City Council meetings. A dedicated webpage was created on the city’s website as, www.Montereypark.ca.gov/Montereypass, to inform the public about the project and provide progress updates. Residents and businesses can also sign up to receive project updates by subscribing to NIXLE, by texting "MPSS" to 888777.

FISCAL IMPACT:

The Monterey Pass Road Emergency Water Main Improvements is included in the FY 22-23 Capital Improvement Plan as Project No. 99025. The following is an estimated cost for the project:

Page 7 of 245 ends

Staff Report

Page 3 of 3 ends

April 19, 2023

CIP 99025 – Monterey Pass Road Emergency Watermain
Engineering Design $ 131,000
Geotechnical $ 100,000
Construction Cost $ 4,800,000
Material Cost $ 1,600,000
Street Rehabilitation $ 950,000
Construction Management and Inspection $ 410,000
Total $7,991,000

Respectfully submitted by: Reviewed by:

Shawn Igoe,
Director of Public Works

Martha Garcia
Director of Finance

Approved by:

Reviewed by:

Ron Bow
City Manager
Karl H. Berger
City Attorney

ATTACHMENT:

None

Page 8 of 245 ends

City Council Staff Report
DAT
E: April 19, 2023
AGENDA ITEM NO:

TO: T
he Honorable Mayor and City Council
FROM: Amy Lee, City Treasurer
SUBJECT: Monthly Investment Report – March 2023
RECO
MMENDATION:

It is recommended that the City Council consider:

1. Receiving and filing the monthly investment report; and

2. Taking such additional, related, action that may be desireable.

EXECU
TIVE SUMMARY:

As of March 31, 2023 invested funds for the City of Monterey Park is $76,874,652.39.

BA
CKGROUND:

In accordance with the City’s Investment Policy, a monthly investment report is presented to the City Council showing the types of investments, dates and maturities, amounts of deposits, rates of interest, and the current market values for securities with maturity more than 12 months. The attached monthly investment report includes a summary investment report for the LA County Pooled Investment Fund, which displays the composition by type for the entire pooled investment fund.

Respectfully submitted by: Prepared by:

Amy Lee
City Treasurer
Martha Garcia
Finance Director
Approved by:

Ron Bow
City Manager
ATT
ACHMENT:

1. Monthly Investment Report
Consent Calendar - 3A

Page 9 of 245 ends

Staff Report
April 19, 2023

ATTACHMENT 1
Monthly Investment Report

Page 10 of 245 ends

INVESTMENTS PORTFOLIO PROFILE:

TOTAL BALANCE AT 03/31/2023 76,874,652.39$

INVESTMENT COMPOSITION
(1) LA COUNTY POOLED INVESTMENT FUND ON DEMAND 3.150% 43,301,144.37$ (See Schedule A for LA County Pool Composition)
(2) LOCAL AGENCY INVESTMENT FUND ON DEMAND 2.425% 26,218,508.02$ Purchase Maturity Interest
(3) CERTIFICATES OF DEPOSIT Date Date Rate
1 PREFERRED BANK 09/03/22 09/03/23 2.51% 100,000
2 PREFERRED BANK 09/08/22 09/08/23 2.67% 150,000
3 SALLIE MAE BANK 08/11/21 08/12/24 0.70% 245,000
4 TOYOTA FINANCIAL SAVINGS BANK 09/16/21 09/16/24 0.65% 245,000 5 SYNCHRONY BANK 09/17/21 09/17/24 0.65% 245,000
6 UBS BANK USA 09/22/21 09/23/24 0.65% 245,000
7 STATE BANK OF INDIA 10/18/21 10/18/24 0.70% 245,000
8 MEDALLION BANK UTAH 01/28/22 01/28/25 1.25% 245,000
9 PENTAGON FEDERAL UNION 01/31/22 01/31/25 1.25% 245,000 10 BEAL BANK 02/02/22 01/29/25 1.15% 245,000
11 VALLIANCE BANK 03/18/22 03/18/25 1.40% 245,000
12 STATE BANK OF TEXAS 03/25/22 03/25/25 1.45% 245,000 13 FIRST FED SAVINGS & LOAN 03/30/22 03/31/25 2.00% 245,000 14 LAFAYETTE FEDERAL CREDIT UNION 03/30/22 03/31/25 2.20% 245,000 15 ALLY BANK 03/31/22 03/28/24 1.95% 245,000
16 COMENITY CAPITAL BANK 04/14/22 04/14/25 2.55% 245,000 17 AMERICU CREDIT UNION 04/21/22 04/21/25 2.30% 245,000 18 BALBOA THRIFT & LOAN 04/29/22 04/29/25 2.00% 245,000 19 CONNEXUS CREDIT UNION 05/26/22 05/28/24 2.65% 245,000 20 METRO CREDIT UNION 07/13/22 07/12/24 3.20% 245,000
21 FIRST TECHNOLOGY CREDIT UNION 08/05/22 08/05/24 3.25% 245,000 22 AUSTIN TELCO FEDERAL CREDIT UNION 12/16/22 12/16/24 5.00% 245,000 23 GREENWOOD MUNICIPAL FED CREDIT UNIO 01/27/23 01/27/25 4.80% 245,000 24 RAIZ CREDIT UNION 01/27/23 01/27/25 4.75% 245,000
25 WORKERS 01/27/23 01/27/25 4.70% 245,000
26 MANUF & TRADERS TRUST CO 01/31/23 01/31/26 4.25% 245,000 27 ALPINE BANK 01/31/23 01/31/25 4.55% 245,000
28 TECHNOLOGY FCU 02/10/23 02/24/25 5.00% 245,000
29 RED CROWN FCU 02/14/23 02/21/25 4.85% 245,000
30 UFIRST FEDERAL CREDIT UNION 02/15/23 02/25/25 4.85% 245,000 31 SEA COMM FEDERAL CREDIT UNION 02/23/23 03/03/25 4.90% 245,000 Total CDs (31) 2.826% 7,355,000.00$
OTHER INFORMATION:

BANK BALANCE: (1)
20,122,998.10$
AVERAGE MATURITY DAYS 58
AVERAGE INTEREST RATE FOR THE MONTH 2.820%

THE CITY'S INVESTMENT HAS SUFFICIENT LIQUIDITY TO MEET THE CITY'S EXPENDITURE REQUIREMENTS FOR THE NEXT 180 DAYS. THE 180-DAY LIQUIDITY DISCLOSURE IS REQUIRED PER GOVERNMENT CODE 53646.

INTEREST EARNINGS FOR 2nd QTR 2022-2023 528,767.96$
THERE HAVE BEEN NO VARIANCES TO THE INVESTMENT POLICY.
(1) Bank balance is maintained to cover outstanding warrants, payroll checks and on-going operating costs.

CITY OF MONTEREY PARK

INVESTMENT REPORT
MARCH 31, 2023

Page 11 of 245 ends

Pooled Specific
Surplus Purpose
PORTFOLIO PROFILE Investments Investments
Inventory Balance at 02/28/23
At Cost 50,302,602,410$ 305,967,013$
At Market 47,393,628,823$ 280,531,044$
Repurchase Agreements -$ -$ Reverse Repurchase Agreements -$ -$ Composition by Security Type:

Certificates of Deposit 3.77% 0.00%
United States Government
and Agency Obligations 66.80% 85.80%
Bankers Acceptances 0.00% 0.00%
Commercial Paper 29.35% 0.00%
Municipal Obligations 0.06% 0.81%
Corporate and Deposit Notes 0.02% 0.00%
Repurchase Agreements 0.00% 0.00%
Asset-Backed 0.00% 0.00%
Other 0.00% 13.39%
1-60 days 31.65% 1.30%
61 days-1 year 29.10% 13.79%
Over 1 year 39.25% 84.91%
Weighted Average Days to Maturity 815

POOLED SURPLUS AND SPECIFIC PURPOSE INVESTMENTS
AS OF FEBRUARY 28, 2023

SCHEDULE A

Page 12 of 245 ends

City Council Staff Report
DATE: Ap
ril 19, 2023
AGENDA ITEM NO:

TO: The Hon
orable Mayor and City Council
FROM: Maychelle Yee, City Clerk
SUBJECT: Professional Municipal Clerks Week Resolution
RECOMM
ENDATION:

It is recommended that the City Council consider:

1. Adopt ing a Resolution declaring the week of April 30 – May 6, 2023 as Professional Municipal Clerks Week in Monterey Park; and

2. Taking such additional, related, action that may be desirable.

EXECUTI
VE SUMMARY:

The Office of the City Clerk is celebrating the week of April 30 – May 6 , 202 3 as Professional Municipal Clerks Week. This week, sponsored by the International Institute of Municipal Clerk’s (IIMC) and celebrated annually, honors and recognizes the Municipal Clerk profession as a vital part of local government celebrated throughout the world including the United States, Canada and 15 other countries. We are enlisting your support in the form of a resolution to honor Professional Municipal Clerks for providing supports to the Council, departmental staff, other agencies, and residents of Monterey Park.

BACKGROUND:

Historically, the Office of the City Clerk recognizes and celebrates the hard work, commitment and devotion Professional Municipal Clerks provide to ensure the integrity and democracy process of Monterey Park residents.

FISCAL
IMPACT:

None.

Respectfully submitted by: Prepared by:

Maychelle Yee
City Clerk
Cindy H. Trang
Deputy City Clerk
Consent Calendar - 3B

Page 13 of 245 ends

Staff Report

Page 2 of 2 ends

April 19, 2023

Reviewed by:

Reviewed by:

Ron Bow
City Manager
Inez Alvarez
Assistant City Manager

ATTACHMENT(S):

1. Draft Resolution

Page 14 of 245 ends

Staff Report
April 19, 2023
ATTACHMENT 1
Draft Resolution

Page 15 of 245 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
MONTEREY PARK DECLARING APRIL 30 THROUGH
MAY 6, 2023, PROFESSIONAL MUNICIPAL CLERKS

WEEK IN MONTEREY PARK

B
E IT RESOLVED by the Council of the City of Monterey Park as follows:

SECTION 1: The City Council finds as follows:

A. The Monterey Park Office of the City Clerk is celebrating the week of April 30 through May 6, 2023 as Professional Municipal Clerks Week.

This week, sponsored by the International Institute of Municipal Clerks (IIMC), honors and recognizes the Municipal Clerk profession as a vital part of local government celebrated throughout the world including the United States, Canada and 15 other countries.

B. In 1984 and in 1994, Presidents Ronald Reagan and Bill Cli nton, respectively, signed a Proclamation officially declaring Professional Municipal Clerks Week the first full week of May and recognizing the essential role Professional Municipal Clerks play in local government.

C. Although it is one of the oldest positions in local government, few people realize the vital services Professional Municipal Clerks perform for their community. Primarily, they act as the cornerstone of their council. They also prepare the council agendas, record and index minutes and maintain the ordinances and resolutions files.

Other responsibilities include keeping the official records of the city and conducting local elections.

D. The Office of the City Clerk provides the professional link betw een the residents, the local governing bodies and agencies of government at other levels. Professional Municipal Clerks serve as the information center on functions of local government and community acting as the contact office for general information, public records requests, receipt of claims and subpoenas.

E. Professional Municipal Clerks have pledged to be ever mindful of their neutrality and impartiality, rendering equal service to all and continually strive to improve the administration of the affairs of the Office of the City Clerk.

Page 16 of 245 ends

Resolution No.

Page 2 of 3 ends

F. We are confident tha t you will stand behind the commitment and devotion Professional Municipal Clerks provide to ensure the integrity and democracy process of Monterey Park residents.

G. The City of Monterey Park recognizes and celebrates the hard work of these dedicated pro fessionals and declare April 30 through May 6, 2023 as Professional Municipal Clerk Week in Monterey Park, honoring and recognizing the essential role Professional Municipal Clerks play in local government.

SECTION 2
: Electronic Signatures . This Resolution may be executed with electronic signatures in accordance with Government Code §16.5. Such electronic signatures will be treated in all respects as having the same effect as an original signature.

SECTION 3 : Recordation. The Mayor, or presiding officer, is authorized to sign this Resolution signifying its adoption by the City Council of the City of Monterey Park and the City Clerk, or her duly appointed deputy, may attest thereto.

SECTION 4 : Effective Date. This Resolution will become effective immediately upon adoption and will remain effective unless repealed or superseded.

PASSED
AND ADOPTED this 19th day of April, 2023.

________________________________
Jose Sanchez, Mayor

Attest:

__________________________
Maychelle Yee, City Clerk

Page 17 of 245 ends

Resolution No.

Page 3 of 3 ends

State of California )
County of Los Angeles) §.

City of Monterey Park )

I, Maychelle Yee, City Clerk of the City of Monterey Park, California, do hereby certify that the foregoing Resolution No. was duly and regularly adopted by the City Council of the City of Monterey Park at a regular meeting held on the 19 th day of April, 2023, by the following vote:

Ayes: Council Members:

Noes: Council Members:

Absent: Council Members:

Abstain: Council Members:

Dated this 19th day of April, 2023.

Maychelle Yee, City Clerk
Monterey Park, California

Page 18 of 245 ends

Consent Calendar - 3C

Page 19 of 245 ends
Page 20 of 245 ends

Staff Report
April 19, 2023
ATTACHMENT 1
Resolution for Sexual Violence Awareness Month
“Denim Day” 2023

Page 21 of 245 ends

RESOLUTION NO.

A RESOLUTION Declaring April 2 6, 2023 to be “Denim Day Monterey Park”, supporting sexual abuse awareness and the belief that there is no excuse and never an invitation to rape.

BE IT RESOLVED by the Council of the City of Monterey Park as follows:

SECTION 1: The City Council finds as follows:

A. The United States Government has declared April as “Sexual Assault Awareness Month” and Peace Over Violence, a Los Angeles County based Sexual Assault and Domestic Violence Victim Advocacy Organization, has declared April 26, 2023 as “Denim Day” in Los Angeles County and the USA.

B. “Denim Day” is intended to draw attention to the fact that rape and sexual assault remain serious issues in our society.

C. Harmful attitudes about rape and sexual assault allow these crimes to persist and allow victims and survivors to be re-victimized.

D. “Denim Day” was instituted to call attention to misconceptions and misinformation about rape and sexual assault, and the problem that many in society remain disturbingly uninformed with respect to issues of sexual assault and rape.

E. With proper education on the matter, there is compelling evidence that we can be successful in reducing incidents of this physically and psychologically damaging crime.

F. The members of the Monterey Park City Council strongly support the efforts of Peace Over Violence to educate people in our community about the true impact of rape and sexual assault in Southern California.

G. In future years, members of the Monterey Park City Council and City Staff will be encouraged to wear jeans the day of the City Council meeting when “Denim Day” resolutions are on the agenda for the City Council approval to bring about awareness of the upcoming “Denim Day” observance.

H. April 26, 2023 is “Denim Day” in the City of Monterey Park. That City Employees, along with residents, business persons, students, and visitors to the City are urged to wear jeans April 26 , 2023 to help communicate the message that there is “no excuse and never an invitation to rape.”

Page 22 of 245 ends

Resolution No.

Page 2 of 2 ends

SECTION 2: Electronic Signatures . This Resolution may be executed with electronic signatures in accordance with Government Code §16.5. Such electronic signatures will be treated in all respects as having the same effect as an original signature.

SECTION 3: Recordation. The Mayor, or presiding officer, is authorized to sign this Resolution signifying its adoption by the City Council of the City of Monterey Park and the City Clerk, or her duly appointed deputy, may attest thereto.

SECTION 4: Effective Date. This Resolution will become effective immediately upon adoption and will remain effective unless repealed or superseded.

PASSED AND ADOPTED this ___ day of ______________, 2023.

________________________________
Jose Sanchez, Mayor

Attest:

__________________________
Maychelle Yee, City Clerk

Page 23 of 245 ends

City Council Staff Report
DATE
: April 19, 2023
AGENDA ITEM NO:

TO: T
he Honorable Mayor and City Council
FROM: Scott Wiese, Chief of Police
SUBJECT: National Crime Victims’ Rights Week Resolution RECO
MMENDATION:

It is recommended that the City Council consider:

1. Adopting a Resolution Declaring the week of April 23 through 29, 2023 to be National Crime Victims’ Rights Week in the City of Monterey Park; and

2. Taking such additional, related, action that may be desirable.

EXECU
TIVE SUMMARY:

Ev
ery April, The Office for Victims of Crime leads communities throughout the country in their annual observances of National Crime Victims’ Rights Week. This year National Crime Victims’ Rights week is observed between April 23 rd – April 29th. We are enlisting
your support in the form of a resolution to honor all victims of crime but especially those victims of the January 21, 2023 shooting incident.

BACKGRO
UND:

In
1981, the President’s Task Force on Victims of Crime was established to help those who had experienced crime and their families. This was an important step toward the protection of and support for victims’ rights. Over the years, crime victims’ rights have evolved. Dedicated professionals have worked to develop support and services for survivors that are more holistic, trauma-informed, and effective at overcoming systemic barriers that certain communities face in prosecuting offenders and obtaining justice.

During National Crime Victims’ Rights week, our nation renews our commitment to providing survivors of crime the support they need to heal.

Consent Calendar - 3D

Page 24 of 245 ends

Staff Report

Page 2 of 2 ends

April 19, 2023
Respectfully submitted by: Prepared by:

Scott Wiese
Chief of Police
Gus Jimenez
Captain
Approved by:

Ron Bow
City Manager
ATT
ACHMENT:

1. Resolution

Page 25 of 245 ends

Staff Report
April 19, 2023
ATTACHMENT 1
Resolution for National Crime Victim’s Week 2023

Page 26 of 245 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MONTEREY PARK DECLARING APRIL 23- 29, 2023 , NATIONAL CRIME VICTIMS’

RIGHTS WEEK IN MONTEREY PARK

BE IT RESOLVED by the Council of the City of Monterey Park as follows:

SECTION 1: The City Council finds as follows:

A. Every April, The Office for Victims of Crime leads communities throughout the country in their annual observances of National Crime Victims’ Rights Week. This year National Crime Victims’ Rights week is observed between April 23rd – April 29th. 2023. We are enlisting your support in the form of a resolution to honor all victims of crime especially those victims of the January 21, 2023 shooting incident.

B. Delivering true justice requires that we provide all victims with the support they need. Persistent barriers still prevent many survivors from receiving the services they need and the justice they deserve.

C. Victims of crime face many challenges well after the occurrence of the crime. Some of those challenges being faced are physical, emotional, mental and at times economical.

D. It takes enormous courage and extradentary strength to emerge from life’s most painful moments. With ongoing support and advocacy, these challenges faced by victims’ and their families can be mitigated.

E. The City of Monterey Park recognizes and honors all victims of crime and their families, by declaring April 23-29, 2023 as National Crime Victims’ Rights Week in Monterey Park. We stand behind the commitment and devotion of those that work hard in bringing justice and support to victims of crime and their families.

Page 27 of 245 ends

Resolution No.

Page 2 of 2 ends

SECTION 2: Electronic Signatures . This Resolution may be executed with electronic signatures in accordance with Government Code §16.5. Such electronic signatures will be treated in all respects as having the same effect as an original signature.

SECTION 3: Recordation. The Mayor, or presiding officer, is authorized to sign this Resolution signifying its adoption by the City Council of the City of Monterey Park and the City Clerk, or her duly appointed deputy, may attest thereto.

SECTION 4: Effective Date. This Resolution will become effective immediately upon adoption and will remain effective unless repealed or superseded.

PASSED AND ADOPTED this 19th day of April, 2023.

________________________________
Jose Sanchez, Mayor
Monterey Park, California

Attest:

__________________________
Maychelle Yee, City Clerk
Monterey Park, California

Page 28 of 245 ends

City Council Staff Report
DATE
: April 19, 2023
AGENDA ITEM NO:

TO: T
he Honorable Mayor and City Council
FROM: Diana Garcia, City Librarian
SUBJECT: 2023 National Library Week Resolution
RECO
MMENDATION:

It is recommended that the City Council consider:

1. Adopt ing a resolution declaring the week of April 23- 29, 2023 to be National Library Week in Monterey Park,

2. Taking such additional, related, action that may be desirable.

EXECU
TIVE SUMMARY:

The Monterey Park Bruggemeyer Library is celebrating the week of April 23-29, 2023 as National Library Week. National Library Week is celebrated nationwide annually in April to highlight the valuable role libraries, librarians, and library workers play in transforming lives and strengthening our communities. Libraries offer opportunities for everyone to explore new worlds and become their best selves through access to information, technology, multimedia content, and educational programs.

FI
SCAL IMPACT:

None.

Respectfully submitted by:

Diana Garcia
City Librarian
Approved by:

Ron Bow
City Manager
ATT
ACHMENT(S):

1. Draft Resolution
Consent Calendar - 3E

Page 29 of 245 ends

ATTACHMENT 1
NLW Draft Resolution
Staff Report
April 19, 2023

Page 30 of 245 ends

RESOLUTION NO.

A RESOLUTION Declaring April 23 – April 29, 2023 as
National Library Week.

BE IT RESOLVED by the Council of the City of Monterey Park as follows:

SECTION 1: The City Council finds as follows:

A. National Library week is celebrated annually in April to highlight the valuable role libraries, librarians, and library workers play in transforming lives and strengthening our communities.

B. L ibraries are accessible and inclusive places that foster a sense of local connection, advancing understanding, civic engagement, and shared community goals;

C. T oday’s libraries and their services extend far beyond the four walls of a building, and everyone is welcome to use their resources.

D. L ibraries provide the opportunity for everyone to pursue their passions and engage in lifelong learning, allowing them to live their best life.

E. L ibraries have long served as trusted institutions for all members of the community regardless of race, ethnicity, creed, ability, sexual orientation, gender identity, or socio-economic status.

F. L ibraries strive to develop and maintain programs and collections that are as diverse as the populations they serve and ensure equity of access for all.

G. L ibraries adapt to the ever -changing needs of their communities, continually expanding their collections, services, and partnerships.

H. L ibraries play a critical role in the economic vitality of communities by providing internet and technology access, literacy skills, and support for job seekers, small businesses, and entrepreneurs.

I. L ibraries are cornerstones of democracy, promoting the free exchange of information and ideas for all.

J. L ibraries, librarians, and library workers are joining librar y supporters and advocates across the nation to celebrate National Library Week;

K. Be it resolved that the City of Monterey Park officially proclaims National Library Week, April 23-29, 2023.

Page 31 of 245 ends

SECTION 2: Electronic Signatures . This Resolution may be executed with electronic signatures in accordance with Government Code §16.5. Such electronic signatures will be treated in all respects as having the same effect as an original signature.

SECTION 3: Recordation. The Mayor, or presiding officer, is authorized to sign this Resolution signifying its adoption by the City Council of the City of Monterey Park and the City Clerk, or her duly appointed deputy, may attest thereto.

SECTION 4: Effective Date. This Resolution will become effective immediately upon adoption and will remain effective unless repealed or superseded.

(Mayor signature and attestation must be on the same page.)

PASSED AND ADOPTED this ___ day of ______________, 2023.

________________________________
Jose Sanchez, Mayor

Attest:

__________________________
Maychelle Yee, City Clerk

Page 32 of 245 ends

City Council Staff Report
+
DATE: April 19, 2023
AGENDA ITEM NO:

TO: The Honorable Mayor and City Council
FROM: Ron Bow, City Manager
SUBJECT: Continue to extend the existence of an employment emergency for the City of Monterey Park
RECOMMENDATION:

It is recommended that the City Council consider:

1. Receiving and filing this report;

2. Continuing to extend the existence of an employment emergency for the City of Monterey Park and authorizing the City Manager to take all practical actions needed to implement the efficient recruitment and retention of persons for employment; and

3. Taking such additional, related, action that may be desirable.

EXECUTIVE SUMMARY:

The City continues to utilize the employment emergency to expedite recruitment processes to fill vacancy positions. Since February 2023, the City has filled a Facility Maintenance Supervisor, Water Utility Maintenance Worker, Maintenance Worker, promoted Police Captain, two Lieutenants, Sergeant, four Corporals, Senior Maintenance Worker, Crew Leader, and Senior Librarian.

Since December 2022, 11 full-time and 14 part-time employees have resigned or retired. The recruitment trend continues to be an employee’s job market with various options for candidates to consider when looking for employment. The data from the U.S. labor market shows a large gap between job openings and workforce participation in 2022, translating into challenges for employers to attract quality candidates and retain current employees. In October 2022, the City was recruiting for 46 full-time positions, December 2022 – 39 positions, February 2023 – 37 positions and the City continues to recruit for 29 vacant full-time positions. Staff recommends extending the employment emergency order due to the recruitment challenges for critical vacancies in the Public Works Department and other departments.

BACKGROUND:

During the months of the employment emergency the City recruited or retained employees in different ways:

Consent Calendar - 3F

Page 33 of 245 ends

Staff Report

Page 2 of 2 ends

April 19, 2023
• Promotional opportunities: current full-time employees promoting or lateral recruitment to different departments; and part-time employees promoting to full- time positions.
• Conducting oral interviews with internal oral raters and reducing timelines from two separate oral panels (external oral raters panel and 2nd interview with internal hiring manager).
• Filling part-time vacancies with shortened recruitment process to minimize hiring timeframe.
• Retaining Assistant City Manager (ACM) incumbent: advanced salary range increase, use of City vehicle, increase in vacation accrual, and vacation cap maximum.
• Leasing City vehicle (ACM): City Manager pursuant to Resolution No. 2022-R49, Section 2 (attached) allowed the City to by-pass the bidding requirements in Monterey Park Municipal Code section 3.20.060 pursuant to MPMC section

3.20.050(A).
• Increase Water Utility Manager salary range based on compensation study data to be competitive in the market.
• Retaining Water Operations Supervisor incumbent: use of City vehicle, move from hourly wage to salaried wage, and provided 40 hours of administrative leave time. • Created and revised class specifications in an expedited timeframe to increase candidate pool for recruitments.
• Revising Personnel Rules and Regulations to bring to Council in May 2023.

FISCAL IMPACT:

None.

Respectfully submitted by:

Ron Bow
City Manager
Review by:

Karl H. Berger
City Attorney
ATTACHMENT(S):

1. Resolution No. 2022-R49

Page 34 of 245 ends

Staff Report
April 19, 2023

ATTACHMENT 1
Resolution 2022-R49

Page 35 of 245 ends

RESOLUTION NO. 2022-R49

A RESOLUTION ADOPTED BY THE CITY COUNCIL FOR THE CITY OF

MONTEREY PARK DECLARING THE EXISTENCE OF A LOCAL

EMERGENCY DUE TO LACK OF EMPLOYEES AND AUTHORIZING THE

CITY MANAGER TO TAKE ALL REASONABLE ACTIONS TO ACCELERATE RECRUITMENT AND RETENTION OF PUBLIC EMPLOYEES.

BE IT RESOLVED by the Council of the City of Monterey Park as follows:

SECTION 1: The City Council finds as follows:

A. Since the City Council officially terminated the COVID-19 local emergency in April, the City took ambituous actions to restore pre-pandemic levels of municipal services;

B. In reviewing personnel data from just the last six months, however, it is apparent that the City is seriously short-staffed.

C. The City of Monterey Park has 325 full time staff positions of which nearly 70 are currently vacant. Of these positions, multiple are critical to protecting public health and safety including, without limitation, Water Production Supervisor; Senior Water Production System Operator; Water Utility Maintenance Worker; Director of Public Works; Facilities Maintenance Supervisor; Finance Manager; Firefighter; Police Officer; Senior Accountant; and Lifeguard;

D. These are positions that directly respond to the public and/or essential to the smooth operation of municipal services including, for example, providing potable drinking water, and ensuring public safety;

E. The City Council notes that multiple sources of publicly available information (see, e.g., “Quantifying the Nation’s Workforce Crisis – State of American Business 2022 Update” [January 10, 2022] published by the United States Chamber of Commerce [www.uschamber.com/workforce/quantifying-the- nations-workforce-crisis-2022-state-of-american-business-update] and “COVID- 19 ends longest employment recovery and expansion in CES history, causing unprecedented job losses in 2020” June 2021 by the United States Bureau of Labor Statistics [www.bls.gov/opub/mlr/2021/article/covid-19-ends-longest- employment-expansion-in-ces-history.htm]) demonstrate that the challenges for recruiting qualified employees is nationwide;

F. Because of the City’s personnel rules and policies, however, a typical time period for securing an outstanding candidate for an open employee position is taking four to six months of processing. This includes the initial recruitment; testing; interviewing; and background check;

Page 36 of 245 ends

Resolution No. 2022-R49

Page 2 of 4 ends

G. In multiple instances, the City has lost interested candidates to the private sector or other public entities simply because the person did not want to continue waiting to be appointed;

H. Being able to accelerate the testing and interviewing will help make the City more attractive to individuals seeking public service. Additional work is needed regarding the titles of positions; compensation; and various fringe benefits. Moreover, a significant overhaul of the City’s personnel rules is crucial to becoming more efficient in the future;

I. In the interim, however, it is in the public interest to cut through the proverbial “red tape” in order to fill positions that are critical to providing municipal services to the public. Under these circumstances, it is apparent that there is an imminent threat to public health and safety that may result from the City’s inability to fill crucial positions in a timely and efficient manner;

J. Consequently, a local employment emergency is declared and the City Manager is authorized to take the actions set forth in this Resolution.

SECTION 2: Authorizations. The City Manager is authorized to take all reasonable and practicable actions to accelerate the process for recruiting, appointing, and retaining persons as City employees to fill all vacant positions. Such actions may include, without limitation, the following:

A. Suspend those portions of the City’s personnel rules that are interfering with the City’s ability to secure qualified candidates. For example, unnecessary testing and interview panels;

B. Temporarily appoint qualified persons to positions in accordance with Monterey Park Municipal Code (“MPMC”) § 2.28.100;

C. Execute agreements, in a form approved by the City Attorney, for the services listed in MPMC § 2.28.190;

D. Consider amendments to titles and classifications of various positions to make them more attractive to qualified candidates;

E. Consider compensation and benefits that will attract qualified candidates to public services; and

F. Commence a substantial overhaul to the City’s personnel rules.

SECTION 3: During the existence of this local emergency, the powers, functions, and duties of the City Manager and the emergency organization of this City will be those prescribed by California law, by ordinance, and resolutions of this City approved by the

Page 37 of 245 ends

Resolution No. 2022-R49

Page 3 of 4 ends

City Council. To the extent that the actions authorized by this Resolution require a meet and confer with the City’s bargaining units, those meetings will be held at the earliest practicable time pursuant to Government Code § 3504.5(b).

SECTION 4: The City Manager is designated as the authorized representative for public assistance and as the authorized representative for individual assistance of the City of Monterey Park for the purpose of receiving, processing, and coordinating all inquiries and requirements necessary to obtain available state and federal assistance.

SECTION 5: This local emergency will be reviewed by the City Council within 60 days in accordance with Government Code § 8630 to determine whether it should be extended by City Council Resolution.

SECTION 6: This Resolution may be executed with electronic signatures in accordance with Government Code §16.5. Such electronic signatures will be treated in all respects as having the same effect as an original signature.

SECTION 7: This Resolution will take effect immediately upon adoption.

PASSED AND ADOPTED this 15
th day of June, 2022.

________________________________
Henry Lo, Mayor

ATTEST:

____________________________
Vincent D. Chang, City Clerk

APPROVED AS TO FORM:

____________________________
Karl H. Berger, City Attorney

Page 38 of 245 ends

Resolution No. 2022-R49

Page 4 of 4 ends

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) §

CITY OF MONTEREY PARK )

I, Vincent D. Chang, City Clerk of the City of Monterey Park, California, do hereby certify that the foregoing Resolution No. 2022- R49 was duly adopted and passed at a regular meeting of the Monterey Park City Council on the 15 th day of June, 2022 by the
following vote:

Ayes: Council Members: Yiu, Chan, Liang, Lo
Noes: Council Members: None
Abstain: Council Members: None

Absent: Council Members: None

Dated this 15th day of June, 2022.

____________________________
Vincent D. Chang, City Clerk

Page 39 of 245 ends

City Council Staff Report
DATE: April 19, 2023
AGENDA ITEM NO:

TO: The Honorable Mayor and City Council
FROM: Diana Garcia, City Librarian
SUBJECT: California State Library Building Forward Library Facilities Improvement Grant
RECOMMENDATION:

It is recommended that the City Council consider:

1. Adopting a resolution authorizing the City Manager, or designee, to apply for, receive, and appropriate grant funds for the California State Library Building Forward Library Facilities Improvement Grant

2. Taking such additional, related, action that may be desirable.

EXECUTIVE SUMMARY:

The California State Library Building Forward Library Facilities Improvement Grant provides competitive grants of up to $10 million to local libraries to support capital projects addressing critical maintenance needs, improving energy efficiency and sustainability, and expanding access digitally and physically.
lf adopted, the proposed resolution would authorize the City Manager, or designee, to apply for the Building Forward Grant, to execute the grant agreement, and to implement a budget amendment if the City is awarded funds. The deadline to apply is May 18, 2023, funds will be awarded in the fall of 2023 and the project completion date is June 30, 2027.

BACKGROUND:

The California State Library Building Forward Library Facilities Improvement Program is the largest single investment made by the state in California’s public libraries. There is $179 million available for this round of grants, which is significantly less than the expected amount of requested funding. Accordingly, the State Library anticipates that they may reduce the amount requested by successful applicants. Additionally, project requests submitted for libraries located in high-poverty areas of the state will be prioritized for funding. Currently high need maintenance projects within the Library are being identified by City staff. Although libraries may apply for up to $10 million in grant funding, staff anticipates that our total request will be in the $2-3 million-dollar range.

Consent Calendar - 3G

Page 40 of 245 ends

Staff Report
Page
2 of 2
April 19, 2023
FISCAL IMPACT:

The City may request up to $10 million from the California State Library to support necessary infrastructure projects. A 50% cash match is required for all grantees. If grant funds are received, the attached resolution would allow Finance to appropriate these funds.

Respectfully submitted by: Reviewed by:

Diana Garcia
City Librarian
Reviewed by:
______
_____________________
Sha
wn Igoe
Director of Public Works
Martha Garcia
Director of Finance
Approved by: Reviewed by:

Ron Bow
City Manager
Karl H. Berger
City Attorney
ATT
ACHMENT:

1. Draft Resolution

Page 41 of 245 ends

ATTACHMENT 1
Draft Resolution
Staff Report
April 19, 2023

Page 42 of 245 ends

RESOLUTION NO.

A RESOLUTION AUTHORIZING THE CITY MANAGER, OR DESIGNEE,

TO APPLY FOR, RECEIVE, AND APPROPRIATE GRANT FUNDS FOR
THE CALIFORNIA STATE LIBRARY’S BUILDING FORWARD LIBRARY

FACILITIES IMPROVEMENT GRANT

BE IT RESOLVED by the Council of the City of Monterey Park as follows:

SECTION 1: The City Council finds and declares:

A. The California State Library (“CSL”) is responsible for administering the Building Forward Library Facilities Improvement Grant.

B. If awarded, the Building Forward grant provides up to $10 million to library agencies to be expended by June 30, 2027.

C. The City is currently proposing necessary maintenance and projects that would improve the energy efficiency of the Library building ("the Project").

SECTION 3: The City Council authorizes the City Manager, or designee, to execute documents to apply for, and potentially receive, up to $10 million in grant monies from the CSL related to the Project.

SECTION 4: The City Manager, or designee, is authorized to execute any required documents to receive the grant for the purposes identified above.

SECTION 5: The City Manager, or designee, is authorized to accept and spend the grant monies identified in this Resolution for the purposes set forth above.

SECTION 6: The City Council amends or supplements the City’s Budget to appropriate the monies identified by this Resolution to pay for the proposals made by the City in support of its grant application. The City Manager, or designee, is authorized to implement the purpose of this section.

SECTION 7: Severability. If any part of this Resolution or its application is deemed invalid by a court of competent jurisdiction, the City Council intends that such invalidity will not affect the effectiveness of the remaining provision or application and, to this end, the provisions of this Resolution are severable.

SECTION 8: Electronic Signatures. This Resolution may be executed with electronic signatures in accordance with Government Code §16.5. Such electronic signatures will be treated in all respects as having the same effect as an original signature.

SECTION 9: Recordation. The Mayor, or presiding officer, is authorized to sign this Resolution signifying its adoption by the City Council of the City of Monterey Park and the City Clerk, or her duly appointed deputy, may attest thereto.

Page 43 of 245 ends

Resolution No.

Page 2 of 2 ends

SECTION 10: Effective Date. This Resolution will become effective immediately upon adoption and will remain effective unless repealed or superseded.

PASSED AND ADOPTED this 19th day of April, 2023.

________________________________
Jose Sanchez, Mayor

Attest:

__________________________
Maychelle Yee, City Clerk

Approved as to Form:

__________________________
Karl H. Berger, City Attorney

Page 44 of 245 ends

City Council Staff Report
DATE: April 19, 2023
AGENDA ITEM NO:

TO: The Honorable Mayor and City Council
FROM: Robert Aguirre, Director of Recreation & Community Services SUBJECT: Tree Memorial Program Recommendation for 2023
RECOMMENDATION:

It is recommended that the City Council consider:

1. Approving to honor Victoria Chavez-Calderon with a memorial tree; and

2. Taking such additional, related action that may be desirable.

EXECUTIVE SUMMARY:

Nominations for the Tree Memorial Recognition Program were advertised and accepted during the month of February 2023. The Recreation and Community Services Department received a nomination application for Victoria Chavez-Calderon.

Subsequently, the Tree Memorial Program Committee consisting of three Community Participation Commissioners and two Recreation and Parks Commissioners, met to review the nomination of Victoria Chavez-Calderon and discuss her consideration for a Tree Memorial based on the criteria established in Resolution Nos—10485 and 11484 (Attachment A).

The Committee reviewed the nominee’s application. After reviewing the information provided on the nomination application for Victoria Chavez-Calderon (Attachment B), the committee voted unanimously to recommend City Council approves to honor Victoria Chavez-Calderon with a Tree Memorial for her service and years of volunteerism in the Monterey Park Community.

BACKGROUND:

To provide a fair and equitable process to honor individuals for their service to the community, the City Council established resolutions outlining the guidelines for conducting the Tree Memorial Program. A Program Committee consisting of three members of the Community Participation Commission and two members of the Recreation and Parks Commission met to review the nomination applications and make recommendations to the City Council.

The nominee, Victoria Chavez-Calderon, is a long-time resident and volunteer. Ms.

Chavez-Calderon has served as a Monterey Park commissioner since 2013, serving on the Community Relations, Art & Culture, and Community Participation Commissions.

Consent Calendar - 3H

Page 45 of 245 ends

Staff Report
April 19, 2023

Page 2 ends

She is also one of the founders of the Monterey Park-Morelia Sister Cities Association and has volunteered on Monterey Park special event committees.

During her many years of volunteerism, Victoria Chavez-Calderon has been recognized by Congresswoman Judy Chu, former Congresswoman/current Los Angeles County Supervisor Hilda Solis, former Assemblymember Mike Eng, and many more. She advocates for immigrant rights, and to quote Congresswoman Judy Chu, “Victoria Chavez-Calderon has spent her entire life defending immigrant communities, advocating for diversity, and building a stronger Monterey Park.” FISCAL IMPACT:

The Tree Memorial plaque and ceremony cost approximately $300, and funding is included in the FY 22-23 adopted budget in the Community Participation Division fund, account no. 1016508-5242.

Respectfully submitted by:

Robert Aguirre
Director of Recreation & Community Services
Approved by: Reviewed by:

Ron Bow Karl H. Berger
City Manager City Attorney
ATTACHMENTS:

A. Resolutions 10485 and 11484
B. Nomination of Victoria Chavez-Calderon

Page 46 of 245 ends

Staff Report
April 19, 2023
ATTACHMENT 1
Resolutions 10485 and 11484

Page 47 of 245 ends

RESOLUTION NO. 10485

A RESOLUTION OF TIIE CITY COUNCIL OF TIIE CITY OF MONTEREY

PARK, CALIFORNIA TO ESTABLISH A TREE MEMORIAL NOMINATION

AND AWARD
WHEREAS, the City of Monterey Park would like to acknowledge important and distinguished members of the City, by recognizing them with the dedication of a tree in their honor; and,
WHEREAS, on August 18, 1999 the City Council of Monterey Park directed staff to form a Committee, consisting of2 members of the Recreation and Parks Commission and 2 members from the Historical Heritage Commission, to establish guidelines regarding an individual being considered for a Tree Memorial; and,
WHEREAS, members of the above mentioned Commissions have met and have submitted their recommendations to the City; and,
WHEREAS, City has incorporated these recommendations into a nomination ~ process and award to honor such individuals; and,
WHEREAS, each February a committee of3 members of the Historical Heritage Commission and 2 members of the Recreation and Parks Commission will be assembled as a Nomination Committee to accept applications for nominations; and, WHEREAS, the Nomination Committee, will review nominations for an honor based on the submission of proper documentation and requirements, and, follow guidelines as set forth by the Tree Memorial Committee, and subsequent alternatives as recommended by staff; and,
WHEREAS, the Nomination Committee will make their recommendations to the City Council in April, with a dedication ceremony to be held in May, close to the anniversary of the City's Incorporation.

NOW, THEREFORE, BE IT RESOLVED that the City of Monterey Park hereby adopts the establishment of the Tree Memorial Nomination and Award, and designates staff to authorize a nomination committee as specified above to accept, review and nominate distinguished individuals as indicated in the following sections.

Page 48 of 245 ends

Resolution No. 10485
Page2
SECTION 1

MEMORIAL PLAQUE I TREE
Plaques to be consistent with plaques that are existing in front of City Hall. Trees that are to be purchased will be of similar type as existing. Cost for the plaques will be charged to the person or group who nominates the individual ($500.00) City Council may waive fees at its discretion.

SECTION II
A.

QUALIFICATIONS
The consideration for selection must include a substantial history of Community Service. For Example:

1. 2.

3. 4.

Individual should have been a long term resident (I 0 years or more) in the City of Monterey Park, and should have provided a service benefit to the entire Community, in one or more of the following ways:

Served on a City elected or appointed position for at least two terms or 5 years, whichever is greater;
Voluntarily served the City as an officer, or board member of, one or more City recognized Service Clubs, volunteer community based organizations or other City service and charitable service organizations, which provide a direct service to Monterey Park residents;
A long term community business leader who has served the Community through his/her financial or voluntary efforts to one or more service and charitable service organization or non profit organization in the City of Monterey Park for a period of no less than 10 years.

An individual, resident or non resident, who has made a significant or cumulative and positive impact on the Community.

B. The term "servedn means that the individual must demonstrate an active role in providing a benefit to the Monterey Park Community, in addition to service to City service and charitable service organizations.

C. Special consideration without regard to the above mentioned qualifications, should be given to an individual, resident or non resident, who has deceased while performing service to our community.

Page 49 of 245 ends

Resolution No. 10485
Page3

SECTION III

NOMINATION PROCESS
A Nominations to be submitted, accepted and considered only one time per year. No limit as to the number of years nominated. No limits imposed on the nomination committee as to how many individuals are recommended each year.

B. Interested parties will be required to fill out an application which will require detailed justification for consideration, provide a picture and other suitable materials deemed necessary. In order to further determine merit, and to add significance to the prestige of the memorial, any individual whose name is put forth should be supported by at least three letters of reference by community members indicating the contribution made and significance, in their opinion.

C. A nomination committee consisting of 5 members from the two Commissions, 3 Historical Heritage and 2 Recreation and Parks, shall be assigned to review the application and consider the qualifications.

D. The time period for nominations are in February, with a selection and ceremony to be held in May, close to the anniversary of the City's incorporation.
'

Page 50 of 245 ends

Resolution No. 10485

Page 4 ends

PASSED AND APPROVED AND ADOPTED this 15th day of March, 2000.

ATTEST:
~~
David M. Barron, City Clerk
City of Monterey Park,
California
StateofCalifornia )
County of Los Angeles ) ss.

City of Monterey Park )
~ela,Mayor
City of Monterey Park
California
I, David Barron, City Clerk of the City of Monterey Park, California, do hereby certify that the foregoing Resolution No.1048Was duly and regularly adopted by the City Council of the City of Monterey Park at a meeting held on the 15 day of March , 2000, by the following vote:

AYES: COUNCILMEMBERS: CBU, BALDERRAMA, ALONSO, VENTI, VALENZUELA NAES: COUNCILMEMBERS: NONE
ABSENT: COUNCILMEMBERS: NONE
ABSTAIN: COUNCILMEMBERS: NONE
Dated this 15th day of March '2000.
~~
David M. Barron, City Clerk
City of Monterey Park
California

Page 51 of 245 ends

RESOLUTION NO. 11484
A RESOLUTION AMENDING RESOLUTION NO. 10485

REGULATING THE PROCEDURES FOR NOMINATIONS AND
ERECTING TREE MEMORIALS.

BE IT RESOLVED by the Council of the City of Monterey Park as follows:

SECTION 1: The City Council finds as follows:

A. In 2000, the Monterey Park City Council adopted a resolution to honor community members whose contributions have made a significant impact on the City of Monterey Park by establishing a Tree Memorial Program, and
B. The City Council believes the display of the these trees and plaques enhances City facilities and inspires citizens to contribute to their community; and
C. It is in the public interest for persons recognized with a Tree Memorial to be so honored without the need for paying a fee.

SECTION 2: Amendments. Resolution No. 10485 is amended as follows :

A. Section 1 is amended in its entirety to read as follows: "Plaques to be consistent with plaques that are existing in front of City Hall.

Similar existing trees at Garvey Ranch Park will be used." B. Subsection A of Section 3 is amended in its entirety to read as follows: "Nominations may be submitted, accepted, and considered only once per year. There is no limit to the number of years in which a person may be nominated. Only three nominations will be recommended to the City Council per year. A person may only receive this honor once."
SECTION 3: City Manager Authorization. The city manager is authorized to promulgate administrative policies and procedures to implement and facilitate the directives set forth in this Resolution.

SECTION 4: This Resolution will become effective immediately upon adoption and will remain effective unless superseded or repealed.

Page 52 of 245 ends

RESOLUTION NO. 11484

Page 2 ends

PASSED AND ADOPTED this 2nd day of May, 2012.

ATTEST:

ILJ)h~vw--
(DaVidBirTOn, CMC, City Clerk
Monterey Park, Cal" rnia
By:

STATE OF CALIFORNIA )

COUNTY OF LOS ANGELES ) SS

CITY OF MONTEREY PARK )
I, DAVID M. BARRON, CMC, City Clerk of the City of Monterey Park, California, do hereby certify that the foregoing Resolution No.11484 was duly and regularly adopted by the City Council of the City of Monterey Park at a meeting held on the 2nd day of May, 2012, by the following vote:

Ayes:

Naes:

Absent:

Abstain:

Council Members: Chu, Wong, Real Sebastian, lng, Lau
Council Members: None
Council Members: None
Council Members: None
Dated this 2nd day of May 2012.
/L;!Jvt6
David Barron, CMC, City~
Monterey Park, California

Page 53 of 245 ends

Staff Report
April 19, 2023
ATTACHMENT 2
Nomination of Victoria Chavez-Calderon

Page 54 of 245 ends

Recreation and Community Services
320 West Newmark Avenue
Monterey Park, CA 91754
Telephone: (626) 307-1388
Website: http://www.montereypark.ca.gov
APPLICATION FOR TREE MEMORIAL 2023

NAME OF
INDIVIDUAL NOMINATED: foll
/ (YIN)
ADDRESS:

NAME OF NOMINATING
GROUP OR ORGANIZATION:

CONTACT PERSON:

P6
ADDRESS: 4?-T- 411/ CITY: /fJ _ / ZIP______
PHONE: Já _ - EMAIL: _
Nomination Process:

Please attach all materials, photos, documentation and letters to this application. The City will make every effort to return materials to the nominating authority listed, however, the City will not guarantee this or the condition of which the materials are returned. Please do not send original documents. Copies of these materials will be sufficient.

Deadline for submission of apt,lication and all materials is Tuesday. February 28, 2023 by 5:30pm. Submit to the Recreation and Community Services Department via mail or email: 320W Newmark Ave. Monterey Park, CA 91754 or [email protected]. A committee of Commissioners will meet in March to review applications and make recommendations to City Council in April. Ceremony to be scheduled thereafter. All Committee review meetings are posted and open to the public. Nominating groups or individuals may speak and bring other pertinent materials to the meeting.

Committee reserves the right to accept, reject, approve or deny any and all of the applications it receives based on review of the materials submitted. The burden of proof as to the worthiness of a particular individual must be demonstrated by the information submitted by the applicant. Common knowledge or prestige of an individual is not enough to qualify for this recognition award.

The City shall determine the location for the tree memorial. Groups or individuals will not be allowed to request a particular site. The decision to plant a new tree versus using existing trees is at the sole discretion of the City. Wording on the plaque will be consistent with existing memorial plaques.

The intent of the program is to have the memorial remain undisturbed forever, however, the City must reserve the right to move, remove or change the existing tree or plaque as it deems necessary.

Please provide at least one picture and other suitable materials deemed necessary. In order to further determine merit, and to add significance to the prestige of the memorial, any individual whose name is put forth should be supported by at least three letters of reference by community members indicating the contribution made and significance, in their opinion.

Page 55 of 245 ends

QUALIFICATIONS
(Monterey Park Resolution No. 10485 & 11484)
Individual should have been a long term resident (10 years or more) of the City of Monterey Park, and has provided a service benefit to the entire Community, in one or more of the following ways (check items that apply):
_/' Served on a City elected or appointed position for at least two terms or 5 years, whichever is greater;
Voluntarily served the City as an officer, or board member of, one or more City recognized Service Clubs, Volunteer community based organizations or other City service and charitable service organization, which provide a direct service to Monterey Park residents; V A long term community business leader who has served the Community through his/her financial or voluntary efforts to one or more service and charitable service organization or non profit organization in the City of Monterey Park for a period of no less than 10 years. 7 An individual, resident or non resident, who has made a significant or cumulative and positive impact on the Community.

The term "served' means that the individual must demonstrate an active role in providing a benefit to the Monterey Park Community, in addition to service to the City and charitable service organizations.

Special consideration without regard to the above mentioned qualifications, should be given to an individual, resident or non resident, who has deceased while performing service to our community.

Nominations may be submitted, accepted, and considered only once per year. There is no limit to the number of years in which a person may be nominated. Only three nominations will be recommended to the City Council per year. A person may only receive this honor once.

Complete resolutions available at:
https://grmservices.grmims.com/CilyojMontereyl(S(ninoqvplvaun4200l n5f3jkce))/orc.aspx

Page 56 of 245 ends

From: peter chan
To: Aguirre, Robert; Bow, Ron; Alvarez, Inez; [email protected] Subject: Tree Memorial Nomination
Date: Monday, October 24, 2022 10:33:16 AM
Attachments: VICTORIA CHAVEZ.doc
[EXTERNAL EMAIL]
CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking links, especially from unknown senders.

Dear Robert,
Mayor Lo and I would like to nominate Ms. Victoria Chavez to be the recipient

for the next
Tree Memorial. Attached please see her resume and she is well qualified for this honor. We will be happy to answer any questions concerning her nomination. Please start the process.

Thank you.

Peter

Page 57 of 245 ends

V I C T O R I A C H A V E Z - C A L D E R O N
E - M A I L : V I C T O R I A . C M O N A R C A @ G M A I L . C O M 1278 D O R N E R D R I V E M O N T E R E Y P A R K C A 9 1 7 4 P H O N E : ( 3 2 3 ) 3 5 6 - 4379
Mrs. Victoria Chavez-Calderon, was born in Morelia, Mich ., Mexico. She attended to Catholic school, Graduated from the Michoacan ’s State Univers ity as Social Worker and Public Relations Administrator. She attended to a Private Journalism School in Guadalajara Mex. She is married to Jose Calderon for 47 years. They have two children : Paulo (45 ) Graduated from Oklahoma Aeronautics School as Commercial Pilot and Flight Instructor, married to Jackeline Collado, they have a 7 years old son Sebastian and they live in Florida .

Riccardo (43) Graduated from Oklahoma University . He graduated from Oklahoma State University as Senior Engineer He is married to Laura Pinkosky, they have a newborn baby Luca, they live in Oklahoma.
35 years ago, Mrs. Chavez and her family, were welcomed to the City of Monterey Park from Former Mayor Judy Chu , Former Chef of Police Don Cross, and Police Officer David Coregan. And Barbara Hammer volunteer coordinator. Mean time Mrs. Chavez and her family become members of St. Thomas Aquinas Church, very active and were important supporters when the Church started the first Spanish Mass.

Mrs. Chavez started working for Mr. Mario J. Machado; a TV Producer, News Broadcaster and Actor, at his Media, Public Relations and direct Sales Companies; ICVC (International Corporate Video Center) and EMMI (Ethnic Marketing Media International). Mr. Machado was a good friend with Former President Ronald Regan, and Mrs. Chavez while working for Mr. Mario J. Machado in 1986 and though Catholic Charities started volunteering her time for the President Ronald Regan Amnesty Program when more than 2.5 million of undocumented aliens, become legal residents in US.

Mrs. Chavez becomes very active in the City of Monterey Park programs, and she was able to assist and help her senior and sick neighbors whom had mobility problems during th e Northridge Earthquake. One night Monterrey Park residents were evacuated to Pico Rivera’s shelter due to a Clorox spelled and again Mrs. Chavez Family had to help and transport their neighbors. Mrs. Chavez Family become respected neighbors and were recognized by the City of Monterey Park Officials.

Page 58 of 245 ends

Volunteer Community Services and Commissions Mrs. Chavez served:
 Neighborhood Watch Program.
 Emergency Preparedness Program.
 Former President Ronald Regan Amnesty Program.
 Citizen’s Police Academy.
 US 1994 Soccer World Cup Volunteer.
 Police Citizen’s Patrol.
 Play Days Committee.
 MP Cherry Blossom Festival
 5 de Mayo Committee.
 Community Relations Commissioner.
 Art and Culture Commissioner.
 Christmas in April, Monterey Park former Mayor Judy Chu community Program
 Women’s International League for Peace and Freedom.
 US-Mexico Sister Cities Association Board of Directors.  Founder of Monterey Park-Morelia Sister Cities Association.  East Los Angeles Collage Foundation.
 St. Thomas Aquinas Catholic Church Hispanic Ministry Coordinator, Parish Council Committee member, Our Lady of Guadalupe Devotion Founder.  Volunteer at Our Lady of Los Angeles Cathedral.
 President of Michoacan’s Clubs Federation in California.  Activist for the Immigration Reform and Latino Rights movement.

AWARDS AND RECOGNITIONS:

Mexican Consulate Outstanding Citizen Recognition Award.

Mexican Consulate Michoacan’s Cultural and Traditions Promoter.

Michoacán’s Governor Mayor Recognition Award “Jose Maria Morelos Medal” US-Mexico Sister Cities Association “Outstanding Organizing Committee for the International Conference in Morelia 2000”.

Spanish TV Station “Community Organizer, The Good People Chain”.

Spanish News Paper Outstanding Citizen Michoacan’s News Paper Recognition Award.

Monterey Park Former Mayor Marie Purvis “Outstanding Citizen Recognition Award”.

Former President Bill Clinton Award “The Volunteer of the Year” Congresswoman Hilda Solis Recognition Award “The Woman of the Year” Congresswoman Judy Chu “Outstanding Citizen Recognition Award” ”People whom make a Difference” The City of Monterey Park Democratic Club Award.

Page 59 of 245 ends

February 26, 2023
Monterey Park City Council
320 West Newmark Ave.

Monterey Park, CA 91754
Dear Honorable Mayor and Members of the City Council,
It gives me great pleasure to strongly recommend Victoria Chavez-Calderon for a Memorial Tree in the City of Monterey Park, California. I have known her for more than 30 years and over the course of that time I have seen her defend our immigrant communities, fight for diversity, and uplift all Monterey Park residents.

More than three decades ago, the City of Monterey Park was facing an ugly anti-immigrant English only movement that was tearing our community apart. At the time, a vocal group of long-established residents resented the new immigrants moving into town and demanded English only signs across the community, books in the library, and passed a resolution declaring that only English should be spoken in the city. This was a dark time for our city, but it was leaders like Victoria that bravely stood up and pushed back. She was one of the strongest critics against this movement and fiercely defended our immigrant communities. Together we worked alongside a multiethnic coalition who successfully fought to overturn the resolution and set us on a new path.

In the following years Victoria continued her advocacy for diversity by establishing the Morelia, Mexico sister cities commission. In doing so, she brought pride to many Mexican American residents and helped promote greater cultural understanding between two different nations and within our own neighborhoods.

At the same time, Victoria has consistently worked hard to build a stronger Monterey Park community. As a member of the Community Participation Commission, she has created opportunities for residents to come together and enjoy cultural performances, historic exhibits, and many other local events. In her capacity she has also led trips to the Hollywood Bowl, visited seniors at the Langley Senior Center, and engaged our youth so that they can also participate in community activities.

Victoria Chavez-Calderon has spent her entire life defending immigrant communities, advocating for diversity, and building a stronger Monterey Park. She is more than deserving of a Memorial Tree in her name and I am proud to strongly recommend her for this honor.

Sincerely,
JUDY CHU, Ph.D.

Member of Congress, 28th District

Page 60 of 245 ends
Page 61 of 245 ends

CHRISTINE MORA
1262 Dorner Drive
Monterey Park CA 91754
(626) 532-6960
February 24,2023
To whom it may concern;
I have known Victoria Chavez-Calderon for several years; she is a grate person who helps every one in our neighborhood, and she doesn’t accept anything in return; she is always taking care of someone in our neighborhood, including myself.

Since Victoria is very involved in the City, community and church activities, she always invit e us to participate in different events, if we haven’t transportation, she give us ride.

We love her, and her family, they are always ready to help our community.

Please take this character letter that will let you know she is a kind giving person, who help every one who needs help.

Sincerely,
Christine Mora

Page 62 of 245 ends

Yadira Orendain
1244 Avenida Cesar Chavez
Monterey Park, Ca 91754
(323) 649-2299
Recommendation Letter for Victoria Chavez-Calderon
To whom it may concern:

This letter is my personal recommendation for Victoria Chavez-Calderon, for a memorial tree in the city of Monterey Park, California.

I have personally known Victoria for more of 15 years, we met while she showed me and my family a home nearby to rent. While viewing the home, she noticed we were a large family and
recommended a duplex home next to hers.

Thanks to her recommendation to the landlord, I’ve been able to live next to my parents a nd siblings. This was a life changing event, it gave me the opportunity to live with my husband and daughter, without having to sacrifice not seeing my family.

Meeting Victoria was one of the best things that ever happened in my life, she is truly a gift of God. When choosing a godmother for my daughter, I didn’t have to look far to find the perfect role model, that’s why I chose her.

In all my years of knowing Victoria, I’ve seen the love, compassion, helpfulness, and willingness to help anyone that crosses her path. Nothing is too small or too big, she will always be there with a smile and loving heart.

Victoria deserves this memorial tree, because it will represent an amazing human that truly shines like a beautiful bright star. If you have further questions, please give me a call at (323) 649
-2299.

Sincerely,
Yadira Orendain

Page 63 of 245 ends

ELENA HENRY
Financial Professional
License # 4102404
Santa Clarita CA
(818) 484-6330
Santa Clarita CA. January 27, 2023
To whom it May Concern;
Re: Letter of Recommendation for Victoria Chavez-Calderon.

I am pleased to wholeheartedly recommend Victoria Chavez-Calderon for any general purpose she wishes to pursue.

I have known Victoria Chavez-Calderon since 1994 while working with her in various community issues. And methodical manner.

Victoria brings a unique blend of intellectual insight as well as a practical can-do attitude.

She is a person of exceptional care, loyalty, integrity and honesty. She possesses a strong ethic and grate discipline to her work in the community. She is a team player with outstanding organizational structure and is able to focus in on priorities in a logical methodical manner.

I have no doubt in my mind that Victoria will excel and succeed wherever she goes and she will bring a great organizational framework to her tasks.

If there are any questions that I can answer I can be reached at the following: (818) 484-6330 or at
[email protected]
I am fully confident that you will find Victoria’s qualifications and prospects worthy of your top consideration.

Sincerely,

ELENA HENRY
Financial Professional
Licen

Page 64 of 245 ends

MARIA HUNT
1090 Alpine Dr.

Monterey Park CA 91754
(626) 281-7722
February 27, 2013
To whom it may concern:

I have known Victoria Chavez-Calderon and her family for many years and I have nothing but positive things to say about her.

Victoria is very involved in the City, Community and Church activities, she is kind with any body whom come to her asking for help, she has a terrific positive attitude.

Over the years I have witnessed her tremendous commitment and impact developing different projects in benefit of our communities.

Victoria is an outstanding Monterey Park resident, a grate example to follow. I am certain this cultivated spills will allow Victoria to excel.

If you have any questions, you can contact me at (626) 281-7722.

Sincerely,
Maria Hunt.

Page 65 of 245 ends

City Council Staff Report
DATE: April 19, 2023
AGENDA ITEM NO:

TO:

FROM:

SUBJECT:

The Honorable Mayor and City Council
Jessica Serrano, Director of Community Development
Waive further reading and adopt Ordinances: 1) Zone Change (ZA- 22-01) to re-zone properties from the Regional Specialty Center (R-S) zone with the
Planned Development Overlay (P-D) zone to the Market
Place Specific Plan (MPSP) zone; and 2) Development Agreement (DA-22-01) to amend in its entirety a Development Agreement between Monterey Park Retail Partners, LLC and the City of Monterey Park for properties collectively operating as the Monterey Park Market Place, located at 2300 Greenwood Avenue and 2000-5500 Market Place Drive, also identified by Assessor’s Parcel Numbers 5275-003-024, 025, 027, 029, 030, 031, 037, and 038.

RECOMMENDATION:

It is recommended that the City Council consider:

1. Waiving the second reading and adopting the proposed ordinances; and

2. Taking such additional, related, action that may be desirable.

EXECUTIVE SUMMARY:

The Ordinances were introduced and received first reading at the April 5, 2023 City Council meeting. The original staff report (from April 5, 2023) is attached for reference.

Second reading and adoption of these Ordinances is recommended. If adopted, the ordinances will take effect in 30 days.

Respectfully submitted by: Prepared by:

Jessica Serrano
Director of Community
Development
Beth Chow, AICP
Senior Planner
Consent Calendar - 3I

Page 66 of 245 ends

Staff Report

Page 2 of 2 ends

April 19, 2023
Approved by:

Ron Bow
City Manager
Karl H. Berger
City Attorney
ATTACHMENTS:

1. Draft Ordinance - Zone Change (ZA-22-01) - Adopting Rezoning of the Market Place from Regional Specialty Center with Planned Development Overlay to the Market Place Specific Plan

2. Draft Ordinance - Development Agreement (DA-22-01)

3. City Council Staff Report, dated April 5, 2023 (without attachments)

Page 67 of 245 ends

ATTACHMENT 1
Draft Ordinance - Zone Change (ZA-22-01) - Adopting Rezoning of the Market Place from Regional Specialty Center with Planned Development Overlay to the Market Place Specific Plan
Staff Report
April 19, 2023

Page 68 of 245 ends

ORDINANCE NO.

AN
ORDINANCE AMENDING THE ZONING MAP ( ZA-22-01) TO

CHANGE THE ZONING FROM REGIONAL SPECIALTY CENTER (R-

S) ZONE WITH THE PLANNED DEVELOPMENT OVERLAY (P-D) TO

THE MARKET PLACE SPECIFIC PLAN (MPSP) TO ALLOW

CONSTRUCTION OF THE FINAL PHASE OF THE MARKET PLACE
DEVELOPMENT.

Th
e City Council for the City of Monterey Park does ordain as follows:

SE
CTION 1: The Cit y Council finds and declares that:

A. On S
eptember 26, 2022, Monterey Park Retail Partners , LLC, a California Limited Liability Company (the “Applicant”), submitted an application pursuant to Title 21 of the Monterey Park Municipal Code (“MPMC”) requesting approval of Zone Change ( ZA-22-01) to rezone the properties collectively operating as the Monterey Park Market Place, located at 2300 Greenwood Avenue and 2000-5500 Market Place Drive, also identified by Assessor’s Parcel Numbers 5275-003-024, 025, 026, 027, 029, 030, 031, 037, 038, and 039 from the Regional Specialty (R -S) zone with the Planned Development Overlay (PD) zone to the Market Place Specific Plan (“MPSP”) zone allow the development of its final phase with retail, auto dealership, last mile distribution, and/or warehouse uses, parking, and related improvements , along with an Amended And Restated Development Agreement (“Project”);
B. Th
e proposed Project was reviewed by the City Planner for, in part, consistency with the General Plan and conformity with the MPMC;
C. In a
ddition, the City reviewed the Project’s environmental impacts under the California Environmental Quality Act (Public Resources Code §§ 21000, et seq., “CEQA”) and the regulations promulgated thereunder (14 California Code of Regulations §§ 15000, et seq., the “CEQA Guidelines”); D. Th
e City Council reviewed the proposed Project and related environmental aspects of the proposal as required by the MPMC at the April 5, 2023, public hearing; and
E. Th
e City Council has carefully considered all pertinent testimony and the staff report offered in the case as presented at the public hearing of April 5, 2023.

SE
CTION 2: Fact ual Findings and Conclusions. The City Council finds as follows:

A. The Applicant is seeking to change the zone regulating the Project from the Regional Specialty (R-S) zone with the Planned Development Overlay (PD) zone to the Market Place Specific Plan (“MPSP”) zone. The Zone Change is desirable to allow construction of the proposed Project.

Page 69 of 245 ends

ORDINANCE NO.

PAGE 2 of 7

B. The property is 63.38 acres (2,760,617 square feet ) in size and irregularly shaped with access from Potrero Grande Drive on the west and Paramount Boulevard to the east. Currently developed on the Project site, the Monterey Park Market Place is a multi -tenant, regional shopping center featuring both large and small tenant spaces, including a gas station and various drive- through restaurants. The area west of the leachate treatment plant, is vacant and ready for development to complete the build- out of the Monterey Park Market Place.

C. The General Plan designation for the P roject site is Commercial . This allows for a broad range of retail and service commercial uses, hospitality, entertainment, medical and professional offices, including those uses existing and contemplated within the Monterey Park Market Place.

SECTION 3: Plannin
g Agency. Pursuant to MPMC § 2.56.020(C), the City Council is the Monterey Park Planning Agency for purposes of this Ordinance.

SECTION 4: Env
ironmental Assessment. The environmental analysis set forth in Ordinance No. ___, considered in conjunction with this Ordinance, is incorporated by reference as if fully set forth including, without limitation, the Notice of Consistency. The City Manager, or designee, is directed to file a notice of determination in accordance with CEQA §§ 21152, 21167(f); CEQA Guidelines § 15094; and any other applicable law.

SECTION 5: Appr
ovals. The zoning for the Project site is changed from the Regional Specialty (R-S) zone with the Planned Development Overlay (PD) zone to the Market Place Specific Plan (“MPSP”) zone. Accordingly, the Zoning Map is amended as set forth in attached Exhibit “ A,” and incorporated by reference. The Market Place Specific Plan attached as Exhibit “B,” and incorporated by reference, is approved as zoning for the Project site.

SECTION 6: Cons
truction. This Ordinance must be broadly construed in order to achieve the purposes stated in this Ordinance. It is the City Council’s intent that the provisions of this Ordinance be interpreted or implemented by the City and others in a manner that facilitates the purposes set forth in this Ordinance.

SECTION 7: Enf
orceability. Repeal of any provision of the Monterey Park Municipal Code does not affect any penalty, forfeiture, or liability incurred before, or preclude prosecution and imposition of penalties for any violation occurring before this Ordinance’s effective date. Any such repealed part will remain in full force and effect for sustaining action or prosecuting violations occurring before the effective date of this Ordinance.

SECTION 8: Rel
iance on Record. Each and every one of the findings and determinations

Page 70 of 245 ends

ORDINANCE NO.

PAGE 3 of 7

in this Ordinance are based on the competent and substantial evidence, both oral and written, contained in the entire record relating to the matter. The determinations constitute the independent findings and determinations of the City Council in all respects and are fully and completely supported by substantial evidence in the record as a whole.

SECTION 9: Limit
ations. The City Council’s analysis and evaluation of the project is based on the best information currently available. It is inevitable that in evaluating a project that absolute and perfect knowledge of all possible aspects of the project will not exist. One of the major limitations on analysis of the project is the City Council’s lack of knowledge of future events. In all instances, best efforts have been made to form accurate assumptions. Somewhat related to this are the limitations on the City's ability to solve what are in effect regional, state, and national problems and issues. The City must work within the political framework within which it exists and with the limitations inherent in that framework.

SECTION 10: Se
verability. If any part of this Ordinance or its application is deemed invalid by a court of competent jurisdiction, the City Council intends that such invalidity will not affect the effectiveness of the remaining provisions or applications and, to this end, the provisions of this Ordinance are severable.

SECTION 11: El
ectronic Signatures . This Resolution may be executed with electronic signatures in accordance with Government Code §16.5. Such electronic signatures will be treated in all respects as having the same effect as an original signature.

SECTION 12: Publ
ications. The City Clerk is directed to certify the passage and adoption of this Ordinance; make a note of the passage and adoption in the records of this meeting; and, within 15 days after the passage and adoption of this Ordinance, cause it to be published or posted in accordance with California law.

SECTION 13: Rec
ording. The City Clerk is directed to certify the passage and adoption of this Ordinance, cause it to be entered into the City of Monterey Park’s book of original ordinances, make a note of the passage and adoption in the records of this meeting, and, within fifteen days after the passage and adoption of this Ordinance, cause it to be published or posted in accordance with California law.

SECTION 14: Effe
ctive Date. This Ordinance becomes effective on the 30 th day following its passage and adoption.

ORD
INANCE NO. ___ HAD ITS FIRST READING ON APRIL 5, 2023, ITS SECOND READING ON ____, AND WAS DULY PASSED, APPROVED, AND

ADOPTED BY THE CITY COUNCIL OF THE CITY OF MONTEREY PARK AT ITS REGULAR MEETING OF ______.

Page 71 of 245 ends

ORDINANCE NO.

PAGE 4 of 7

Jose Sanchez, Mayor
ATTEST:

________________________________
Maychelle Yee, City Clerk

APPROVED AS TO FORM:

________________________________
Karl H. Berger, City Attorney

Exhibit A: Zoning Map
Exhibit B: Specific Plan

Page 72 of 245 ends

EXHIBIT A
Zoning Map

Page 73 of 245 ends

Exhibit A

Existing Zoning

Proposed Zoning

Montebello

ZONE

CHANGE TO
MARKET
PLACE

SPECIFIC PLAN
Market Place Specific Plan

Page 74 of 245 ends

EXHI
BIT B
Market Place Specific Plan

Page 75 of 245 ends

April 2023

MARKET PLACE SPECIFIC PLAN

Page 76 of 245 ends

i

TABLE OF CONTENTS

I. INTRODUCTION .................................................................................................................... 1 A. SPECIFIC PLAN AREA ............................................................................................... 1 B. BACKGROUND ......................................................................................................... 3 C. RELATIONSHIP OF THE SPECIFIC PLAN TO PRIOR APPROVALS AND THE ZONING REGULATIONS ......................................................................................................... 4 D. DEFINITIONS ............................................................................................................ 4 II. SPECIFIC PLAN OVERVIEW ................................................................................................... 6 A. PURPOSE AND AUTHORITY OF THE SPECIFIC PLAN ................................................ 6 B. SPECIFIC PLAN SCOPE AND GOALS ......................................................................... 6 C. CONSISTENCY WITH THE GENERAL PLAN ............................................................... 7 D. SPECIFIC PLAN IMPLEMENTATION MEASURES ..................................................... 10 III. OVERVIEW OF LAND USE PLAN ......................................................................................... 11 A. DEVELOPMENT CONCEPT ..................................................................................... 11 B. LAND USE PLAN ..................................................................................................... 12 C. GRADING CONCEPT ............................................................................................... 12 IV. EXISTING UTILITIES AND INFRASTRUCTURE ...................................................................... 13 A. CIRCULATION ........................................................................................................ 13 B. WATER SERVICE .................................................................................................... 13 C. RECLAIMED WATER ............................................................................................... 13 D. WASTEWATER ....................................................................................................... 14 E. DRAINAGE ............................................................................................................. 14 F. GAS/ELECTRIC/TELECOMMUNICATIONS .............................................................. 14 G. SOLID WASTE DISPOSAL ........................................................................................ 14 H. FIRE PROTECTION .................................................................................................. 14 I. POLICE SERVICES ................................................................................................... 14 V. DEVELOPMENT STANDARDS .............................................................................................. 14 A. PERMITTED USES .................................................................................................. 15 B. OUTDOOR DISPLAYS AND SEASONAL SALES ........................................................ 16 C. ON-SALE AND OFF-SALE ALCOHOL USES .............................................................. 17 E. SITE PLANNING STANDARDS ................................................................................. 18 F. ARCHITECTURE AND DESIGN REVIEW .................................................................. 19 G. LANDSCAPING ....................................................................................................... 20 H. SIGNS ..................................................................................................................... 26 I. REFUSE FACILITIES ................................................................................................. 28 J. ACCESS AND CIRCULATION ................................................................................... 29 K. TRIP REDUCTION AND TRAVEL DEMAND MEASURES .......................................... 29

Page 77 of 245 ends

ii

L. PARKING ................................................................................................................ 32 M. TRIP GENERATION ................................................................................................. 32 VI. INDIVIDUAL PROJECT APPROVALS .................................................................................... 33 A. PROJECT CLEARANCES AND ADMINISTRATIVE DESIGN REVIEW .......................... 33 B. DIRECTOR’S REVIEW ............................................................................................. 34 C. ADVISORY DETERMINATION ................................................................................. 34 D. RIGHTS GRANTED UNDER PROJECT CLEARANCE .................................................. 34 E. PROJECT CLEARANCE EXPIRATION ....................................................................... 34 VII. ADMINISTRATION OF SPECIFIC PLAN ............................................................................... 34 A. DIRECTOR AUTHORITY .......................................................................................... 34 B. AMENDMENTS ...................................................................................................... 35 C. ADMINISTRATIVE MODIFICATIONS ...................................................................... 35 D. TIME LIMITS .......................................................................................................... 36 VIII. APPEALS ......................................................................................................................... 36 A. APPEALS ................................................................................................................ 36 IX. CONDITIONS OF APPROVAL AND MITIGATION MEASURES ............................................... 36 A. CONDITIONS OF APPROVAL AND MITIGATION MEASURES ................................. 36 LIST OF FIGURES AND EXHIBITS ............................................................................................. 38

Page 78 of 245 ends

1 I. INTRODUCTION
This Monterey Park Market Place Specific Plan ( Specific Plan) was prepared in conformity with Government Code § 65451, et seq . Together with zoning regulations adopted by the Monterey Park Municipal Code ( MPMC) and other Applicable Law (defined below), this Specific Plan sets forth the regulations for the devel opment and operation of the Monterey Park Market Place project (Project or the Market Place).

Pursuant to Government Code § 65450, a specific plan must include text and a diagram or diagrams, which specify all of the following in detail:
• The distribution, location, and extent of the uses of land, including open space within the area covered by the plan.
• The proposed distribution, location, extent, and intensity of major components of public and private transportation, sewage, water, drainage, solid waste disposal, energy and other essential facilities proposed to be located within the land area covered by the plan and needed to support the land uses described in the plan. • Standards and criteria by which development will proceed, and standards for the conservation, development, and utilization of natural resources, where applicable. • A program of implementation measures , including regulations, programs, public works projects and financing measures necessary to carry out the above items. • A discussion of the relationship of the Specific Plan to the General Plan.

This Specific Plan is compatible and consistent with the goals and policies outlined in the City of Monterey Park’s General Plan (General Plan). This Specific Plan will further the goals and policies of the General Plan as more fully described below.

This Specific Plan was prepared to provide the essential relationship between the policies of the General Plan and actual development in the Project area. By functioning as a regulatory document, the Specific P lan provides a means of implementing the General Plan. All future development within the Specific Plan boundaries must be consistent with the standards set forth in this document.

A. SPECIFIC PLAN AREA
This Specific Plan regulates real property (a triangular-shaped parcel consisting of approximately

63.68 acres) located in the southeast portion of the City of Monterey Park, in the County of Los Angeles, State of California, immediately north of the Pomona Freeway, State Route 60 (Pomona Freeway), and west of Paramount Boulevard as shown on Figure 1 (Specific Plan Area).

Page 79 of 245 ends

2 Figure 1: Specific Plan Area
Regional access to the Specific Plan Area is provided via the Pomona Freeway south of the Site.

Paramount Boulevard provides the major access route to and from the Pomona Freeway in both eastbound and westbound directions. Local access is provided through Market Place Drive via Potrero Grande Drive ( See Figure 2). The Specific Plan Area is bounded by Southern California Edison (SCE) property to the northwest and northeast, and by the Pomona Freeway to the south.

Figure 2: Market Place Aerial – Local Access

Page 80 of 245 ends

3 Other surrounding land uses include the SCE Mesa substation to the northwest and a cemetery and residential use to the northeast. The approximately 145- acre Operating Industries Incorporated (OII) landfill, also referred to as the “ South Parcel” landfill, is located south of the Pomona Freeway.

B. BACKGROUND
On or about December 19, 2 012, the Monterey Park City Council adopted (a) Res olution No. 11549 approving the Monterey Park Market Place Precise Plan (PP-12-01) and Tentative Tract Map No. 071549 (TM-12-01) and certifying the Supplemental Environmental Impact Report (SCH NO. 1999051058); and (b) Resolution No. 11548 a statement of overriding considerations for the Monterey Park Market Place Precise Plan. On or about January 16, 2013, the City Council adopted Ordinance No. 2094, approving a Development Agreement between the City of Monterey Park and Monterey Park Retail Partners, LLC to allow the development of the Monterey Park Market Place. The Monterey Park Market Place Precise Plan covered the same geographical location as the Specific Plan Area.

Although part of the USEPA -designated OII landfill superfund site, the Monterey Park Market Place does not contain any hazardous materials and consists of two distinct areas . The Market Place portion that is to the east and north of Market Place Drive (which Drive is currently designated as APN 5275-003-026 and - 027) is comprised of various tax parcels that have been largely developed with approximately 310,000 square feet of retail floor area:

1. APN 5275-003-030 and -031: A retail warehouse and gas fueling depot.

2. APN 5275-003-038: A retail home improvement center.

3. APN 5275-003-029, -037 and -039: Various retail uses.

The Market Place portion that is to the west of Market Place Drive and north of Pomona Highway (SR 60) is currently designated as APN 5275-003-025 and was not redeveloped. Between the two areas of the Market Place development, APN 5275 -003-024 is the existing Leachate Treatment Plant (LTP) and Thermal Destruction Facility (TDF) facilities (which are not part of the Monterey Park Market Place development) but contained within the Specific Plan The Monterey Park Market Place area also includes various easements on the adjacent SCE parcel for grading, utilities, parking, drainage , and other permitted uses (collectively, the SCE Easements).

The Precise Plan allowed up to 500,000 square feet of floor area , but permitted the Planning Director or Planning Commission to approve modifications allowing up to 600,000 square feet.

Page 81 of 245 ends

4 C. RELATIONSHIP OF THE SPECIFIC PLAN TO PRIOR APPROVALS AND THE ZONING

REGULATIONS
This Specific Plan supersedes other development regulations and standards set forth in the MPMC (MPMC Title 21) for the Specific Plan Area. Except where the provisions of this Specific Plan expressly provide otherwise, the provisions of this Specific Plan are applied in lieu of the provisions of the zoning regulations. For development standards not established as part of the Specific Plan, the standards in the zoning regulations apply. Terms used in this Specific Plan have the meanings as set forth in Section 1.D, below. Further, any terms used in this Specific Plan that are not defined or described herein have the meanings set forth for them in the MPMC.

Nothing in this Specific Plan is intended to, nor does it, revoke or modify any permits, approvals, or entitlements previously granted for the Specific Plan Area, except the Precise Plan , which is superseded in its entirety. All existing improvements and uses in the Specific Plan Area as of the effective date hereof are deemed to be in full compliance with this Specific Plan.

D. DEFINITIONS
Unless the contrary is stated or clearly appears from the context, the following definitions govern the construction of the words and phrases used in this Specific Plan. Words and phrases not defined by this chapter have the meaning set forth in the MPMC or Applicable Law. “Applicable Law” means, in addition to federal and state laws and regulations, the ordinances, rules, regulations, fees and official policies of the City governing the Specific Plan area including, without limitation, the City’s zoning regulations and General Plan. “Applicant” means the applicant for an Individual Project. “Conceptual Development Plans” mean the conceptual development plans set forth in Section V.D.2, below.
“Data center ” means facility used primarily for the storage, management, processing, and transmission of digital data, which houses computer and/or network equipment, systems, servers, appliances and other associated components related to digital data operations. Such facility may also include air handlers, power generators, water cooling and storage facilities, utility substations, and other associated utility infrastructure to support sustained operations at a data center.
“Director” means the Director of Community Development, or designee. “Floor area” means the sum of the gross areas of the floor or several floors of a building or buildings measured from the exterior faces of walls, including elevator shafts or stairwells at each

Page 82 of 245 ends

5 floor, floor space in penthouses and attic space with headroom of eight feet or more, and excluding basement space, open balconies, or vehicle parking or storage. “General Plan” means the Monterey Park General Plan.
“Last Mile Distribution Center” means a warehouse and distribution facility, fulfillment center, or sortation center, that recei ves goods and merchandise from manufacturers or warehouses for direct delivery to purchasers, and may include customer pick-up and drop-off. “Individual Project” means the construction, erection, addition to, or structural alteration of any building or structure, or use of building or land or change of use of a building or land, on a lot located in whole or in part within the Specific Plan Area , which requires a grading permit or building permit, but does not include the following:

Interior or exterior remodeling of an existing building, or the change of use of an existing building unless the remodeling/change of use increases the number of total a.m., p.m., or Saturday peak hour or daily trips exceeding the respective Trip Cap, as determined by the Director.

The rehabilitation or reconstruction of an existing building or structure, which was damaged or destroyed by fire, flood, wind, earthquake or other disaster, or the public enemy.

Demolition of any existing building or structure with a validly issued demolition permit. “Project” means the Monterey Park Market Place.
“Project Clearance” means the Director ’s ministerial review and verification of an Individual Project’s conformance with the requirements of this Specific Plan. “SEIR” means the Supplemental Environmental Impact for the Monterey Park Market Place (SCH No. 1999051058).
“SCE” means Southern California Edison.
“Trip Cap” means the maximum number of projected a.m., p.m., and Saturday peak hour and daily trips that may be generated cumulatively by all existing and future development within the Specific Plan Area, as set forth in Section V.D.3, below.
“Warehouse” means a commercial or manufacturing unit used for the storage of goods and merchandise, together with ancillary office and other support spaces.

Page 83 of 245 ends

6 II. SPECIFIC PLAN OVERVIEW
A. PURPOSE AND AUTHORITY OF THE SPECIFIC PLAN
This Specific Plan is intended to provide for the orderly and efficient development of the Specific Plan Area in accordance with the provisions of the General Plan. In conjunction with the General Plan, the Specific Plan implements the plan for the physical development of the Specific Plan Area and a guide to all future development within the plan area.

A Specific Plan may be prepared for any defined geographic area , which might benefit from specialized land use regulations and development standards.

The Specific Plan provides for development within the Specific Plan Area and establishes the permitted uses, development intensity , site planning and development standards, design and architecture, landscaping, signs, refuse facilities, access and circulation, parking , and trip reduction measures of the Project.

B. SPECIFIC PLAN SCOPE AND GOALS
Implementation of General Plan goals and policies will occur through the establishment of land use designations, traffic circulation patterns, development policies, and the identification of backbone infrastructure necessary to support the planned intensity of development.

To achieve this purpose, the Specific Plan has the following goals:

1. Establish the planning concept, design theme, development regulations, and procedures necessary to achieve an orderly and compatible development;

2. Implement the goals, policies, and objectives of the General Plan;

3. Establish a framework to create a successful Project with a mix of predominantly retail uses with retail-supporting uses, such as Last Mile Distribution Center and Warehouse uses;

4. Meet changing market demands for more home delivery by allowing car sales, Last Mile Distribution Center and Warehouse uses;

5. Facilitate the full build-out of the Specific Plan Area; and

6. Provide clear design guidelines and standards to allow for flexibility in the implementation and build-out of planned development within the Specific Plan area.

Page 84 of 245 ends

7 C. CONSISTENCY WITH THE GENERAL PLAN
The General Plan serves as the long-term planning guide for future development throughout the City. The General Plan operates as a guide to the type of community desired for the future and provides the means to accomplish that goal. California Law and the MPMC require a Specific Plan to be consistent with the General Plan. This Specific Plan is consistent with the General Plan and advances the goals and policies identified below.

1. Land Use Element : The Specific Plan is consistent with the Land Use and Urban Design Element of the General Plan and the following goals and policies:
• Goal 1: Commercial districts that allow a variety of retail, service, and entertainment uses and that accommodate flexibility over time.
• Policy 1.1: Flexibility. Ensure zoning regulations provide flexibility regarding allowed uses.
• Goal 2: Dynamic mix of businesses, uses, and employment that sustains a strong local economy and contributes to a fiscally sustainable tax base. • Policy 2.1 : Flexibility. Provide flexible and clear development standards to allow commercial, professional, industrial, institutional, and hospitality businesses and uses to expand and thrive economically.
• Policy 2.2: Business Growth. Facilitate the growth of a diverse business sector resilient to change over time and compatible with a broad range of skills and workers. • Goal 12: High design quality in all new commercial developments and rehabilitation projects.
• Policy 12.1 : Compatibility. Require new, infill, and rehabilitation projects in commercial districts be compatible with existing contexts in terms of site design, scale, building design, materials, and architectural approaches. • Policy 12.2: Comprehensive Design. Provide for comprehensive design review of new commercial development.
• Goal 14: The Market Place as a regional destination for diverse shopping, dining and entertainment experiences.
• Policy 14.1: Flexibility. Ensure that zoning regulations applicable to the Market Place properties provide focus for the uses the City looks to attract, while providing flexibility to accommodate emerging new uses and markets over time. • Policy 14.2: Traffic. Work with property owners and property managers to address and manage traffic associated with the Market Place , so that visitors avoid traveling through adjacent residential neighborhoods.

Page 85 of 245 ends

8 • Policy 14.3: High Design Quality. Insist upon high design quality and landscape treatments upon establishment and over time.

The land uses allowed under the Specific Plan are consistent with the Land Use P olicy Map (Land Use and Urban Design Element, Figure LU -1) and the building intensity/heights are consistent with the Regulating Plan (Land Use and Urban Design Element, Figure LU -4). The Specific Plan will allow for a variety of retail and service uses, plus Last Mile Distribution Center and Warehouse uses that will facilitate home delivery of retail goods. The Specific Plan will provide flexibility by expanding the range of uses permitted in the Specific Plan Area, which will also promote a more dynamic mix of businesses and uses, create jobs, and contribute to the tax base. The expanded uses will provide a more diverse business sector and a broader range of job opportunities. The Specific Plan’s architectur al and landscaping standards are of high quality and are compatible with surrounding development currently existing and proposed in the vicinity of the Specific Plan Area. The Specific Plan will require the comprehensive design review of all new buildings. The Specific Plan requirements and design review will further the policy of high design quality . Consistent with the City ’s urban design plan, this Specific Plan requires a landscaping plan that will provide for an organized and consistent landscaping design for the Specific Plan Area , including dense plantings and mature plant materials. The Specific Plan provides requirements for circulation and for a Trip Cap, which will further the policy to manage traffic to and from the Market Place and avoid traffic in adjacent residential neighborhoods.

2. Economic Development Element: The Specific Plan is consistent with the Land Economic Development Element of the General Plan and the following goals and policies:
• Policy 1.1: Encourage a pattern of development that balances revenue -generating land uses in phase with other uses that demand services. • Policy 1.2: Encourage the growth or relocation of industries that generate local tax and employment advantages.
• Goal 2.0: Attract new businesses to the commercial Focus Areas identified in the Land Use Element.
• Policy 2.2: Concentrate development in sectors where growth is forecast in the short- to mid-term. Focus efforts on retail and hospitality uses in the short- term and light industrial uses subsequently.
• Goal 7.0: Create a major regional- serving commercial center north and south of Potrero Grande Drive, north of the Pomona Freeway.
• Policy 7.1: Work with the City of Montebello to ensure good access to the Focus Area via Paramount Boulevard.
• Policy 7.2: Encourage development of retail businesses within the OII/Edison area,

Page 86 of 245 ends

9 which serve a regional market and maximize tax revenue potential. • Policy 7.3: Work closely with SCE to create a reuse plan for SC E properties that optimizes potential for retail commercial and complementary development. • Policy 7.4: Pursue public infrastructure improvements that will support and facilitate redevelopment of the OII/Edison area.
• Policy 7.5: Work with Ca ltrans to enhance the appearance of Pomona Freeway frontage bordering the Oll/Edison area.

The Specific Plan continues the transformation of the closed OII landfill area adjacent to the Pomona Freeway into a major retail center that includes regional retail uses intended to bring additional shoppers from outside the City , or needed warehouse or distribution facility , any of which will raise additional tax revenue. The Specific Plan is anticipated to continue to attract additional national and regional retail and supporting uses to the City, thereby creating additional employment opportunities for City residents. For analysis of Goal 7.0 and Policies 7.1 through 7.5, see the discussion of the Land Use Element, above.

3. Circulation Element: The Specific Plan is consistent with the Circulation Element of the General Plan and the following goal and policies:
• Policy 4.5: Work with the Los Angeles County Metropolitan Transportation Authority to establish bus routes and stops at appropriate locations throughout the City to adequately serve retail, employment, and other public gathering areas. • Policy 5.1: Provide for a citywide Class III bicycle path system consistent with Figure C-4 of the Circulation Element.
• Policy 5.2: Require that bicycle racks and adequate pedestrian facilities be incorporated into new commercial development projects.
• Goal 6.0: Ensure that all development projects provide well-designed parking facilities that are safe, convenient, and attractive.

As further described in Section V. K below, the Specific Plan area includes a bicycle path system, bike racks, an on -site bus stop, and on -site bicycle and pedestrian facilities to encourage mass transit and bicycle transportation and to reduce vehicular trips to the Site .

This Specific Plan also requires landscaped parking lots with adequate lighting and pedestrian circulation plans that ensure that parking facilities will be safe, convenient, and attractive.

4. Safety and Community Services Element : The Specific Plan is consistent with the Safety and Community Services Element of the General Plan and the following goal and policy:
• Goal 7: Minimize the potential damage to structures and loss of life that could result from earthquakes.

Page 87 of 245 ends

10 • Policy 7.1: Continue to implement California Building Code seismic safety standards for construction of new buildings. This contains the most recent seismic requirements for structural design of new development and redevelopment to minimize damage from earthquakes and other geologic activity.

All new buildings would comply with current California Building Code seismic safety standards.
• Goal 16: Protect the community from soil, groundwater, and leachate contamination from the OII site.
• Policy 16.2: Encourage commercial development on the north parcel.

This Specific Plan does not disturb, regulate, or otherwise affect the ongoing remediation and cleanup efforts on the site. The existing Leachate Treatment Plant ( LTP) and Thermal Destruction Facility (TDF) facilities (which are not part of the Monterey Park Market Place) will continue to operate to process contaminants from the South Parcel of the OII site and are exempted from the regulations of this Specific Plan. This exemption applies to both the current LTP and TDF location and any other location in the Specific Plan Area where such facilities ma y be relocated. This Specific Plan will facilitate developing the Market Place property (north parcel) to a beneficial use by permitting the continued development and operation of a regional retail center and encouraging development of commercial and retail- supporting uses, including warehouse and distribution uses, on the existing underutilized site. • Policy 19.5: Require that all non- residential developments provide adequate exterior lighting to promote visibility to deter crime and support law enforcement surveillance efforts.

As set forth in Section V.K. below, development in the Specific Plan area would provide such adequate exterior lighting.

D. SPECIFIC PLAN IMPLEMENTATION MEASURES

1. Introduction. This Section addresses Government Code § 65451, which requires that specific plans include a program for implementation , including regulations, conditions, programs, and additional measures necessary to implement the Specific P lan. The responsibilities and procedures required for implementing the Specific Plan are identified in this S ection, including responsibility for capital improvements and financing and the regulations that will govern its implementation.

The Applicant(s) will finance and/or construct a ll public and private infrastructure improvements to support new development in the Specific Plan area including , without limitation, water mains, sewer trunk lines, dry utilities, and drainage.

Page 88 of 245 ends

11 Each Applicant for an Individual Project must make any unpai d contributions toward maintaining Transportation, Fire, Police, and Library services by paying development impact fees consistent with the requirements of the Specific Plan and Applicable Law.

2. Implementation Schedule . The infrastructure improvements, as determined by the Public Works Director and per the Finance Plan in this S ection, will be matched to meet the needs of each Individual Project.

3. Infrastructure and Public Facilities. Consistent with Applicable Law, this Section provides an overview of the parties involved in the implementation, ownership, and long -term maintenance responsibilities for the private infrastructure and public facilities required to support the Specific Plan Area. Conceptual plans are set forth in Figure 3 (Concept Infrastructure).

4. Financing Plan. The financing and maintenance plan for the Specific Plan ensures the timely completion of public facilities, streets, utilities, and other necessary capital improvements, as well as the proper maintenance of these facilities. The Applicant(s) of Individual Projects will fund needed infrastructure and public facilities , through the following activities:
a. Fund new on-site and off-site public infrastructure and services needed to support the Specific Plan development;
b. Utilize the existing Monterey Park Transportation Improvement Program ( TIP) fee programs to fund required off-site street infrastructure; c. Pay applicable development impact fees to fund other necessary infrastructure and public facilities;
d. Phase on -site improvements to ensure they are constructed when necessary and when funds are available to construct public improvements; and e. Provide for r easonable reimbursements from other development for infrastructure costs that the Specific Plan area is required to advance.

III. OVERVIEW OF LAND USE PLAN
A. DEVELOPMENT CONCEPT
The Specific Plan provides a framework for developing approximately 63.68-acres in the southeast portion of Monterey Park and an additional nine- acre area of easements owned by SCE. The development is a highway oriented commercial project consisting of approximately 600,000 square feet of commercial uses and/or distribution and warehouse uses, with adequate supporting parking spaces and associated landscaping , inclusive of existing an d proposed

Page 89 of 245 ends

12 development within the Specific Plan Area. Collectively, the Specific Plan Area and SCE easement areas are referred to as the “Site.”
Development may be based on four Conceptual Development Plans, set forth in Section V .D.2, below, or as otherwise allowed under the Specific Plan.

Build-out of the Specific Plan would provide a range of economic, fiscal, and quality of life benefits to the City.

B. LAND USE PLAN
This Specific Plan provides a framework of infrastructure and urban design that will accommodate the wide range of commercial/industrial uses anticipated over the life of the Project while remaining consistent with Monterey Park’s suburban character.

New development of Individual Projects may be based on one of the Conceptual Development Plans ( see Figures 4A, 4B, 4 C, and 4D). Development options other than the Conceptual Development Plans are permissible as set forth in the Specific Plan.

C. GRADING CONCEPT
Grading plans for an Individual Project’s building pads, roadways, pedestrian paths, water, sewer, and other utilities will be developed as needed for each Individual Project . Grading may consist of over excavation of soils beneath proposed buildings, to a depth of three to four feet, to remove unsuitable building material.

Limited import for Individual Projects may be necessary , and is permissible , to stabilize soils depending upon the final geotechnical recommendations of a soils engineer.

All grading must be accomplished pursuant to a Grading Plan that contains the following:
a. Best management practices (BMPs).
b. Non-paved areas must be revegetated or restored promptly after installation of utilities using drought- resistant, fast -growing vegetation that would quickly stabilize exposed ground surfaces. Alternative materials rather than reseeding (e.g., gravel) may be used in accordance with the Director’s direction.
c. Runoff must be conveyed in accordance with the approved site drainage plans. d. Energy dissipaters or similar devices may be required at the end of drainpipe outlets to minimize erosion during storm events.
e. Grading cannot occur during the wet season (November 1-April 15) unless erosion control devices acceptable to the City are implemented.

Page 90 of 245 ends

13 f. Grading must be completed such that permanent drainage away from foundations and slabs is provided and so that water does not pond near proposed structures or pavements.

IV. EXISTING UTILITIES AND INFRASTRUCTURE
The intent of this Section is to ensure that the Specific Plan Area is devel oped to support development of the proposed land uses and that on-site and off-site infrastructure systems have adequate capacity to serve the Project at build-out.

Development of Individual Projects may require improving existing infrastructure and services in the Specific Plan Area. Basic utilities, including, water, sewer, and other utilities already exist on- site.

The Government Code requires that a specific plan include text and diagrams that specify “the proposed distribution, location, and extent and intensity of major components of public and private transportation, sewage, water, drainage, solid waste disposal, energy, and other essential facilities proposed to be located within the area covered by the plan and needed to support the land uses described in the plan.”
This Section of the Specific Plan fulfills this requirement and meets the MPMC requirements for the preparation of specific plans. In addition, this S ection facilitates orderly development by identifying “backbone” utility infrastructure needed to support the proposed development.

A. CIRCULATION
The Specific Plan Area is accessible from Market Place Drive , Potrero Grande Drive , and Paramount Boulevard off the Pomona Freeway. Internal vehicular circulation within the Specific Plan Area is set forth in the conceptual plans (see Figures 4A, 4B, 4C, and 4D).

B. WATER SERVICE
Water service is provided by the Monterey Park Water Utility Division and San Gabriel Valley Water District. New development within the Specific Plan Area will be served a s shown in the Concept Infrastructure Plan (see Figure 3).

C. RECLAIMED WATER
Currently there are no recycled water systems in the Specific Plan vicinity.

Page 91 of 245 ends

14 D. WASTEWATER
Wastewater service is currently provided by Sanitation Districts of Los Angeles County. There is adequate sewer treatment capacity to serve build- out of the Specific Plan Area. The Concept Infrastructure Plan is attached as Figure 3.

E. DRAINAGE
The onsite storm drain system is designed to provide 100% capture during a 25-year storm event (see Figure 3). Detention basin outlets is designed for five-year through 100-year events.

Stormwater conveyance and treatment requirements must meet City and State Water Resources Control Board MS4 Requirements. The treatment types include bioswales, bioretention cells, infiltration trenches, permeable pavement, and/or detention basins , as needed based on the proposed site plan layout.

F. GAS/ELECTRIC/TELECOMMUNICATIONS
Dry utilities are provided by SCE and the Southern California Gas Company (see Figure 3) .

Telecommunications will be provided by Verizon , AT&T, Cox Communications, and/or similar communications entity. No capacity issues are identified by these service providers that would interfere with the build-out of the Specific Plan area.

G. SOLID WASTE DISPOSAL
Solid waste disposal and recycling will be accomplished consistent with the Section V.I below .

Solid waste disposal is provided by Athens Services.

H. FIRE PROTECTION
The Monterey Park Fire Department provides fire protection services in the Specific Plan Are a and has adequate personnel, equipment, and facilities to serve the Specific Plan Area.

I. POLICE SERVICES
The Monterey Park Police Department provides police protection services in the Specific Plan Area and has adequate personnel, equipment, and facilities to serve the Specific Plan Area.

V. DEVELOPMENT STANDARDS
The purpose of this Section is to provide development standards for review and approval by the Director of Individual P rojects proposed for construction within the Specific Plan Area. Such

Page 92 of 245 ends

15 standards include permitted uses, materials , tenant storefronts, lighting , landscaping, signs , colors, parking, setbacks, building height, as well as access and circulation.

A. PERMITTED USES
The uses in Table 1 are permitted within the Specific Plan Area.

TABLE 1
Permitted Uses(1)
(Numbered footnotes are explained below the table)
Alcohol Sale and Service for on- or off-site consumption Art / Collectibles (galleries, sales, and supplies)
Automotive (2)
Banks (3, 4)
Beauty/Health Spa (5)
Bicycle shops (rentals, sales, and repair)
Blueprinting and photocopying (mailbox , UPS, or FedEx
type)
Boat / Marine Supplies, Motorcycle, Motor Sco oter Sales (new or used)
Book or Stationary Store, including Newsstand
Catering Service, Food (not truck catering)
Cellular Phone Store, including Accessories
Cleaners (with no hazardous materials]
Clothing, Shoe, and Accessories (sales and services)
Computer / Software / Technology (7)
Data Center
Department Stores
Drugstore / Pharmacy w/Drive-through (8)
Electronic sales & services, such as Radio Shack
Fitness Center / Gym/ Health Club(9)
Florist / Nurseries
Furniture Store
Gas station
Grocery /Food Store/ Supermarket
Hardware / Home Improvement Store
Hobby /Specialty Store

Indoor Amusement/Entertainment/Arcades (10)
Jewelry, Watches (sales and repair)
Last Mile Distribution Center
Medical/Professional/Administrative/Service Office (11) Music Shop (sales, services, and instruction)
Music/Movie Sale and Rental
Nutritional / Weight Loss Center (12)
Outdoor Dining
Parking (13)
Party Supplies
Pet shop / Pet Super Stores (14)
Photovoltaic Systems, including solar arrays and related infrastructure
Public Utility Substation/Battery Energy Storage System (15)
Restaurants (sit-down & drive-through)
Retail Eating Establishment (6)
Specialty Retail (16)
Sporting goods
Temporary / Seasonal stores & kiosks
Retail warehouse stores & discount club stores
Wholesale and Distribution Warehouse
Wireless Telecommunications Facilities Communications , such as Cellular Sites

Such other uses that the Director may determine are no
more impactful than the above uses and that are otherwise consistent with the Specific Plan.

1. Including all related and accessory uses from time to time and evolution of such uses over time.

2. Automotive uses include automobile (car and truck) dealerships for new or used vehicles (conventional or delivery such as Tesla or Carvana), including automobile preparation, storage, collision and service centers, automobile rentals, automotive parts sales such as AutoZone, O’Reilly Auto Parts, and other similar retail stores, accessory vehicle maintenance and repair located in the interior of a structure or on a surface lot, electrical vehicle charging stations and supporting infrastructure.

3. Maximum of one freestanding bank. Other bank (s) may be permitted if integrated into the premises and operation of retail tenant permitted herein. A bank building and remote ATM is considered one bank and not considered as a separate ATM.)

4. ATM Kiosk (Maximum of two).

5. Beauty/Health Spa includes other related uses such as barbershop, hair salon, nail salon, waxing, and eyebrow salons.

Page 93 of 245 ends

16 6. Retail Eating Establishments include without limitation bakeries, delicatessens, coffee shops, juice bars, and ice cream, frozen yogurt, and candy shops and may contain ancillary drive-through windows.

7. Computer/Software/Technology include s without limitation retail sale/service shops for cable and internet provider companies such as Xfinity, Comcast, AT&T, Dish, Time Warner Cable, T-Mobile, Verizon, Boost Mobile, and others.

8. Drug stores include without limitation cosmetics/beauty supplies/vitamin store.

9. Maximum of one big-box fitness user such as 24 -Hour Fitness, LA Fitness, Crunch Fitness, etc. No limit on small boutique fitness operators such as Soul Cycle, Orange Theory Fitness, CorePower Yoga and other small gyms offering group fitness exercises which are permitted uses.

10. Indoor Amusement/Entertainment/Arcades include without limitation small shops such as internet café, painting, ceramics, and escape room, and larger shops such as indoor trampoline park, go -karting/driving ranges, mini-golf, and movie theaters.

11. Medical/ Professional/ Administrative/ Service Office includes without limitation 1) Professional, service, and administrative offices such as financial, legal, real estate, insura nce offices and travel agency office s; 2) Medical offices including without limitation veterinarian, dental, optometry, urgent care, hospital/acute or urgent care, wellness, plastic surgery, medical clinic, weight loss clinic, and 3) tutoring/education establishments.

12. Nutritional/Weight Loss Center includes instructional classes for yoga, martial arts, music, dance, vitamin/supplement retail stores, and similar uses. The number of establishments is not limited by the number of “fitness centers” as noted in footnote 9 above.

13. Parking and Loading uses include surface, subsurface and structured parking for vehicles, parking and staging for trucks and tractor trailers, bicycle racks and lockers and any parking or loading for on- or offsite uses.as a primary use or accessory to a permitted use.

14. Retail Pet Store including an ancillary veterinarian facility (veterinarian facility floor area not to exceed 1,000 square feet).

15. Public Utility Substation Use includes interconnected Battery Energy Storage Systems provided by the CPUC.

16. Specialty Retail includes retail sales not associated with another permitted use, including without limitation a limited range of products or specialty items.

B. OUTDOOR DISPLAYS AND SEASONAL SALES

1. A Home Improvement use may include outdoor displays (maximum total of 4,250 square feet adjacent to the front entrance of the building), truck rentals (maximum of 10 parked on-site at one time) , and seasonal sales (maximum total of 10,300 square feet adjacent to the east side of the outdoor garden center, a total of 150 days annually).

2. Tenants greater than 50,000 square feet are permitted to include outdoor displa y areas (not to exceed 5% of their leased square footage) and seasonal sales (not to exceed 10% of their leased square footage , a total of 120 days annually). Specific location , duration and size of such areas are subject to the approval of the Director, provided that such areas otherwise comply with the requirements of this Specific Plan and MPMC regulations.

3. All other high-quality tenants with at least 20 stores in California or 50 stores nationally of a similar quality as stores found in other high-quality shopping centers, as determined by the Director are permitted to include outdoor display areas. Specific location, duration and size of such areas are subject to the approval of the Director, provided that such areas otherwise comply with the requirements of this Specific Plan, and MPMC.

4. Other exceptions, such as outdoor display areas or mall- wide seasonal sales, may be

Page 94 of 245 ends

17 granted as determined by the Director.

5. Material staging areas are permitted at the rear of major tenants (75,000 square feet or larger), provided that such staging areas do not encroach in the required 30-foot setback from the property line required pursuant to Section V.E.2.

C. ON-SALE AND OFF-SALE ALCOHOL USES
Within the Specific Plan Area, restaurants serving alcoholic beverages are limited to five alcohol licenses upon approval by the Department of Alcoholic Beverage Control. A maximum of six drive-through uses are permitted within the Specific Plan Area, provided that such establishments meet all other design guidelines and restrictions provided in this Specific Plan.

D. DEVELOPMENT INTENSITY

1. Maximum Permitted Floor Area . The maximum total permitted floor area within the Specific Plan Area may not exceed 600,000 square feet of the land uses described in Table 1.

2. Conceptual Development Plans. Individual Projects in the area that are undeve loped as of the effective date of the Specific Plan (Phase III) may be developed in accordance with one of the following Conceptual Development Plans:
a. Option A inv olves construction of a Last Mile Distribution Center of up to 97,000 square feet of Floor Area (see Figure 4A).
b. Option B involves construction of a Warehouse of up to 175,000 square feet of Floor Area (see Figure 4B).
c. Option C involves construction of an automobile dealership with a collision and/or service center totaling up to 100,000 square feet of Floor Area (see Figure 4C). d. Option D involves construction of up to 150,000 square feet of Floor Area o f retail uses (see Figure 4D).

Any Individual Project may include different uses permitted by the Specific Plan, provided that the Trip Cap is not exceeded. Additional study or analysis, as required by the Director to ensure that the Trip Cap is not exceeded will be provided by project applicant.

The location and distribution of the buildings and parking must be substantially as shown on the Conceptual Development Plans or as otherwise approved by the Director in connection with an Individual Project.

Page 95 of 245 ends

18 3. Trip Cap. The maximum development for the entire Specific Plan Area is limited to 1,213 projected a.m. peak hour, 1,490 projected p.m. peak hour, 2,460 projected Saturday peak hour, and 22,936 projected weekday daily trips from all existing and proposed development.

E. SITE PLANNING STANDARDS
Site Planning Standards are those provisions that affect the site planning of an Individual Project. The categories that relate to this Specific Plan are building height, setback, and parking.

1. Building Height – Building height within the Specific Plan Area is limited to 80 feet, as measured from the adjacent grade. Architectural features are allowed to project an additional 15 feet above the roof line.

2. Floor Area Ratio – Flo or Area Ratio (FAR) is limited to 0.65.

3. Setback – The Site is surrounded by SCE’s right-of-way and the Pomona Freeway. The Site must maintain a 30 -foot setback from property lines adjacent to a public Right-of-Way and the Freeway . The Specific Plan Area is allowed to have zero- foot setback from property lines adjacent to the SCE Easement A reas. All setbacks must be clear to the sky but may include roadways, utility infrastructure, loading, parking, landscaping, and fences and walls.

4. Aisle Width – P arking areas must use a minimum of 24 -foot aisle widths for two -way configurations and a minimum of 12-foot widths for one-way configurations. Parking area aisle widths must be a minimum provide for a minimum 25-foot back-out area for parking spaces. Standard parking stalls must be a minimum 9’ x 18’ stall size. Compact parking spaces are permitted pursuant to Section V.E.5 below.

5. Parking Standa rds – The Site must comply with Applicable Law for handicapped parking area. All such parking stalls must be located reasonably near the storefronts for easy access and be striped and signed in a manner clearly showing the layouts of each parking space.

6. Compact Spaces – T he Site may include compact parking spaces. Compact spaces are those reduced from the standard 9 ’ x 18’ to 7 ‘ 6 “ x 16’. Compact stalls may not total more than 22% of the total required parking space on the site and must be clearly marked as “COMPACT,” with a site layout design approved by the Director.

7. Loading Standards – E very warehousing/storage/light industrial tenant space must be provided with at least one off-street loading dock, bay, or space for every 25,000 square feet of gross floor area. The loading space must be a minimum of 12’ width x 40’ length x 14’ height. Loading docks or bays must be provided for users that require truck loading spaces and that contain more than 50,000 square feet of floor area. Truck loading bays or docks must be located to allow for trucks to back into bays. All loading bays must be screened from sight from the public right-of-way.

Page 96 of 245 ends

19 F. ARCHITECTURE AND DESIGN REVIEW
Architectural plans for Individual Projects that are determined by the Director to be consistent with following design requirements of the Specific Plan will, if otherwise compliant with Applicable Law, be approved by the Director as part of the Project Clearance.

1. Storefronts – The design standards require tenant storefronts for all retail buildings intended for more than one tenant that will ensure high quality design and u se of materials consistent with that of the Specific Plan c oncept and will produce a variety of designs that are individually unique and are consistent with the overall design concept , subject to the Director’s approval. Such storefronts must be created in a variety of volumes and spaces, to maximize each store’s visibility. Storefront design may include awnings, canopies, overhangs, decorative wall treatment, pilasters, lighting fixtures, and other primary architectural elements associated with the overall design concept.

Storefronts are not required for Last Mile Delivery/Warehouse uses or, as determined by the Director, any other use the design or functional requirements of which would be inconsistent with inclusion of a storefront. All storefront improvements and designs must comply with this Specific Plan as determined and approved by the Director.

2. Materials – Th e approved materials for the Specific Plan Area include, without limitation, simulated wood, steel, metal, cement, plaster, aluminum, manufactured stone, bricks and /or stucco or Exterior Insulation Finishing Systems. Typically, the buildings will be blo ck, concrete or masonry tilt-up, wood or steel-framed structures.

3. Colors – Bu ilding colors are guided by , but not restricted to, the surrounding developments and environments. Potential colors for basic building structures within the Specific Plan Area will be, without limitation, as follows:
a. Light shades of earthy tones – whites, br owns, and oranges. b. Other potential accent colors that include greens , browns, oranges, blues, and rust/burgundy tones.
c. Colors related to tenant’s branding and/or trademarks. d. Changes to the color palette of the development must be approved by the Director.

4. Mechanical Equi pment
a. All mechanical rooftop and structure equipment must be fully screened and enclosed in architecturally treated parapets from view of Market Place Drive and the Site ’s parking areas, as required by sight lines.
b. It is prohibited for m echanical equipment to be exposed on the wall surface of a building.
c. Screening materials and color must be compatible with the overall building design.

Page 97 of 245 ends

20 d. It is prohibited for at grade backflow devices, electrical transformers , and other mechanical equipment to be located within the front or street- side setbacks or landscaping, unless located underground, with the exception of public safety features or as may be required by any utility.

5. Building / Fire Standards – The Project must comply with Applicable Law.

6. Wireless Communication Facilities – Any facilities that are used for wireless communication facilities may not exceed the allowable building height and are required to be screened from view or integrated architecturally into the structure they support and shall be subject to the Director’s approval.

7. Approval of T enant Plans –Applicants must submit all proposed tenant building plans to the Director for rev iew. The Director may approve such plans including, without limitation, such additional changes that may be recommended by the Public Works Director, or designee, if they are consistent with this Specific Plan , any previously approved architectural plans for the building, and any prior project approvals relevant to the tenant space.

G. LANDSCAPING
Landscape selections must accentuate the design style of nearby buildings, but matters such as life span of the trees, drought tolerance, colors , and maintenance requirements should also be incorporated into the overall design. Landscape plans require the Director’s approval. All landscaping must comply with the City’s Water Efficient Landscape Regulations.

1. Plant Materials -All p lants must be drawn from the list of suitable plant materials provided in the following table. Exceptions for using other plant materials is allowed subject to the Director’s approval. Interior trees must be at eight feet tall during installation, measured to the top of branches from ground service at tree trunk, with maximum growth height of approximately 30 feet. Exterior trees located along the entryways of the Site must be at least 10 feet tall during installation, and a maximum growth height of approximately 50 feet. There is 15- foot height limit for any plant material under SCE owned overhead power lines.

Table 2
Plan
t Palette
Botanical Name Common Name
Tree Selections
Eucalyptus citriodora Lemon Gum

Page 98 of 245 ends

21 Platanus acerifolia London Plane
Brachychiton populneus Bottle Tree
Koelreuteria bipinata Chinese Flame Tree
Acacia smallii Acacia
Lagerstroemia indica Crape Myrle
Albizia julibrissin Silk Tree
Magnolia Grandiflora Southern Magnolia
Pinus canariensis Canary Pine
Liquidambar styraciflua Sweet Gum
Geijera parviflora Australian Willow
Ulmus parvifolia Chinese Elm
Prosopis Glandulosa Honey Mesquite
Magnolia grandiflora Southern Magnolia
Quercus virginiana Live Oak
Pinus taeda Lobolly Pine
Shrub Selections
Abelia grandiflora Abelia
Carissa grandiflora Natal Plum
Cistus purpureus Rockrose
Lantana montevidensis Lantana
Mahonia aquifolium Oregon Grape
Pennisetum setaceum Fountain Grass

Page 99 of 245 ends

22 Pittosporum varieties Mock Orange
Tecomaria capensis Cape Honeysuckle
Trachelospermum jasminoides Star Jasmine
Xylosma Congestum “Compacta” Shiny Xylosma
Viburnum tinus Laurustinus
Rhaphiolepis varieties Hawthorn
Juniperus varieties Juniper
Hemerocallis ‘Happy Returns’ Happy Returns Daylily
Hex cornuta ‘Burfordii Nana’ Dwarf Burford Chinese Holly Hex vomitoria ‘Nana’ Dwarf Yaupon Holly
Juniperus conferta ‘Blue Pacific’ Blue Pacific Juniper
Lantana montevidensis Gold & Purple Lantana
Rhaphiolepis indica Indian Hawthorn
Groundcover Selections
Fragaria chiloensis Strawberry
Gazania varieties Gazania
Vinca minor Periwinkle

2. Planting Design – Landscaping mu st be provided along Site roadways to accent the entrance and create a framework that flows through the entire Site. Various trees must be planted for aesthetic value and shade in the parking areas . Additional landscaping must be placed near proposed buildings to accentuate architecture style. All undeveloped areas must comply with the City’s Vacant Lot regulations (MPMC § 4.30.060). Landscaping and irrigation plans signed by a landscape architect and/or landscape contractor must be submitted, and approved by the Director . Any variations to the approved plant palette requires Director approval.

Page 100 of 245 ends

23 The design patterns of the Site ’s landscaping must provide both formal and informal groupings of deciduous and evergreen shade trees, flowering shrubbery , and ground cover. The following measures incorporate the landscape design character and visual qualities for development of the Site:
a. Landscaping in the interior of the parking area must be at least 10% of the total area of the parking area. A minimum of three -foot-wide landscaped planter and/or grass area must be located adjacent to all rights-of-way and continuously maintained. b. Landscape plans must include plans for the Landfill Cap area , where no water percolation is permitted. Raised planters and pots must be used for trees, shrubs, and floral materials in this area. Raised planters must be designed to drain into Director approved drainage systems.
c. All landscaping plans must show the location of turf, trees, shrubs, walks, fences, and any ponds, fountains, or other decorative landscaping features:
 Indicate soils preparation, where necessary;
 Provide a typical planting detail for trees and shrubs;  List the botanical and common names of all plants with the quantity of each and their container size;
 Clearly portray the location, coverage , and specifications of the permanent automatic irrigation system.
d. Landscaping and irrigation systems must be installed as required in plans approved by the Director.
e. An automatic irrigation system must be installed in all landscaped areas to ensure proper annual irrigation. The Applicant must construct all irrigation systems . These will be segregated into metering zones with individual meters and timers that will provide appropriate irrigation for landscaping throughout the Site. These systems will also have rain and moisture detectors to prevent over irrigation . All systems will be standard in design with typical pop-up heads and flexible raisers. f. Seasonal landscape colors must be provided as necessary , creating a livelier feel to the Site. Potential accent colors, i.e., marigolds, petunias, calendulas, must be placed at accent areas to provide additional color throughout the Site. g. Water features must be surrounded with landscaping. Flower bowls are to be placed at the corners of the fountain to blend with the landscaping and the design style.

3. Site Furnishings – Pedestrian friendly and landscape enhancing improvements must be placed or constructed throughout the pedestrian walkways in front of the main retai l storefronts and the restaurants (except in front of a home improvement store).

Improvements may include be nches, tables, and flowerpots that will complem ent the

Page 101 of 245 ends

24 buildings and landscaping of the Site. Other furnishings may include trash cans enclosed within holders that are also similar in design style and colors that blend in with the overall building style.

4. Screening - A six-fo ot high wall will be maintained to screen the LTP/TDF parcel from all public visibility. Screening of this parcel requires an approximately 20-foot retaining wall along the eastern side and portions of the northern sides of the LTP /TDF parcel boundaries. A heavy landscape treatment of ground cover, shrubs, and tall growing dense trees will be maintained around the LTP/TDF parcel, as permitted by site constraints.

5. Fences - If p ermitted under the SCE Easements, a six-foot high screen will be installed and maintained along the boundary and/or outer edge of the Site, subject to the approval by SCE and the Director. A six-foot fence will be installed and maintained along the Pomona Freeway Right-of-Way, as required per CalTrans standards and subject to CalTrans review and approval. Landscaping with informal groupings of trees, plants, and grass areas shall complement this portion of the Site.

6. Lighting - Ligh ting will create a strong , attractive night identity for the Site. Sele cted elements within the Site will be highlighted with illumination. These elements are selected for the ability to enhance the dimension and character of the building architecture, as well as to promote public safety. Lighting fixtures, including lighted signs, shall be state-of-the-art and energy-efficient and shall be focused down on buildings and in parking lot areas.

All proposed decorative and shoebox light ing fi
xture placements must be designed to
reflect best building practices regarding illuminatio n, visibility, safety , security, and overall presentation for the night identity of the Site. Particular attention must be paid to the illumination of all sidewalks and connecting walkways. Lighting fixtures and standards shall be consistent with respect t o design , materials, colors, and the established architectural building. All lighting shall be confined within the Site and the east access road. Lighting requires approval by the Police Chief, or designee, in addition to the Director.
a. Style – Lighting fixtures in the areas of building structures, eaves, and pedestrian areas will give support to the architectural elements.
b. Interior Parking Lot, Greenwood Avenue , and Market Place Drive – Lighting must be provided by the combined use of up to 1,000 -watt, 4-Way, 3-Way, 2-way, or 1- way entablature with 40-foot-high poles (measured from the bottom of the concrete base) with “shoebox” style fixtures to flow with the style of the buildings. Within the main interior parking areas, these lighting poles are to be p laced in every other row of parking aisles . All poles will have a sufficient illumination radius area to cover the aisles and to provide visibility.

Page 102 of 245 ends

25 c. Parking Aisles – The restaurant pads and the home improvement center may have up to 1,000-watt 3-and 2-way or 1-way entablature with 40-foot shoebox poles that are positioned to properly illuminate these areas . Positioning of the interior lights will create an average of three footcandles and not less than two footcandles within all areas of the interior aisles and not less than one footcandle at exterior aisles. d. Boundaries – The use of 400-watt 1-way entablature with 30-foot shoebox poles shall be situated and maintained along the boundaries of the Site or a 2 -way entablature along the main drive aisle that connects Market Place Drive and Greenwood Avenue to serve both the main drive aisle and the adjacent parking. The illumination will not only identify the Project perimeter but also support security measures within the retail center and the parking areas that are located along the boundary of the Site. e. Freeway Boundary – Proper lighting will be placed and maintained along the Pomona Freeway edge of the Site to enhance the development.
f. Illumination Intensity – Light spill beyond parking lots or roadways on the perimeter of the Site may not be greater than 0.5 footcandl es. Light sources must be shielded and focused to reduce visibility from residential areas and the adjacent Pomona Freeway, while maintaining pub lic safety and adequate lighting to ensure sign visibility.
g. Security – All buildings and structures must provide proper lighting fixtures to illuminate the areas at the back of each store and the side of each building to assure proper visibility and security. Except as otherwise expressly provided in the Specific Plan, the minimum lighting level for the Specific Plan Area is one footcandle. h. Indirect lighting – Indirect illumination of building and landscaping will be utilized to accentuate architectural features , to create interest on large wall sections , and to uplight trees and water features. The lighting plan requires Director approval. i. Illumination Levels – Use of a variety of lighting height levels at entries, plazas, parking lots, landscaping , fountains, and other areas where evening activity is expected to create an exciting nighttime environment.
j. Decorative Lighting – Decorative light poles with ornamen tation associated with the design style will be installed and maintained in pedestrian areas and walkways .

Decorative wall lights must also be incorporated into storefront designs at regular intervals.
k. Entryway – Decorative light poles will be located alon g Market Place Drive to accent the roadways leading into the main interior retail area and provide a smooth transition of decorative lighting to standard interior lighting fixtures. Along with other amenities, these lighting designs and locations are formulated to promote pedestrian friendliness, as well as safety and security.

Page 103 of 245 ends

26 H. SIGNS
A Master Sign Program (MSP) must be submitted for Phase III for Director approval, and must incorporate the MSP for Phase I and II of the development. The MSP must include all exterior signs including the location, type, height, and size of such signs for Phase III. This Section of the Specific Plan sets forth some overall design concepts and philosophy to be further refined by the MSP. The total signage is the Specific Plan Area must substantially conform the following standards.

1. Freestanding Signs – A combination of freestanding signs varying in size and height are proposed to create the initial identity for the Site and the identification of major tenants.

They are located to provide direction for the Specific Plan Area. All characters, letters, logos, and other information on signs must be coordinated in placement, colors, size, and location in conformance to the Specific Plan’s design theme and compatible signage that is comparable with typical regional retail centers. Table 3 reflects the types, numbers and the sizes of the freestanding signs associated with the Project.

Table 3
Free
Standing Signs
Type: Area / Face
Pylon Signs (Up to 3) Tenant: 900 SF each, 5,400 SF total Property Identification: 200 SF each , 1,600 SF Total:
7,000 SF
Maximum Height: 75 feet
Tenant Freeway Obelisk Signs (Up to 8) 75 SF each, 1,200 SF total Maximum Height: 25 feet Monument Identity Signs (Up to 4) 200 SF each, 1,600 SF total Maximum Height: 17 feet
Entry Identity Signs (2) 250 SF each, 1,000 SF total
Maximum Height: 17 feet
Signs over LTP/TDF
Flares (1)
Tenant: 2,500 SF
Property Identification: 1,200 SF
Total: 3,700 SF Maximum
Height: 65 feet

Page 104 of 245 ends

27 2. To identify the Site, the following types of signage and their locations reflect the development design concept:
a. Entry Identity Sign – The entry identity signs will be located at the “ grand entrances” leading into the Site. The se signs consist of tenant identification, as well as Project identification. Two entry identity signs , one placed at the main entry located at the southwest corner of Market Place Drive and Paramount Boulevard, and one placed at Potrero Grande Drive and Greenwood Avenue, will highlight the Site entry areas. b. Monument Identity Sign – Up to four monument identity signs will be us ed as key entry signs:
 Up to two monument identity signs will be located at each side of the Market Place Drive entry near Neil Armstrong Street, near the retaining wall and the sidewalks.

These signs will be similar in design , color, and material to the pylon signs described below.
 Up to two more monument identity signs will be positioned close at the western end of the Site.
 Up to eight tenant obelisk signs will be evenly spaced at the Site boundary along the Pomona Freeway. The design and location of these signs is to promote store and Project awareness . The major tenants of the Specific Plan Area may display their own name and/or logo on these si gns. These signs may also include directional information to the Site. Signs will be internally illuminated and may contain accent lighting.
c. Up to three pylon signs will be placed near the southern Site boundary . They will be located approximately 1,000 feet apart from each other. The p ylons may accent the major tenants’ identities for visibility from both sides of the Pomona Freeway. The overpass, the Pomona Freeway curves, and the Pomona Freeway ’s changes in elevation warrant the height of these three signs.
d. One sign is proposed to cover the existing LTP /TDF 60-foot flares. The flares are 10 feet in diameter and are separated b y approximately 20 feet. The sign will have four sides and will reach across both flares. The look of the sign will be consistent with the other proposed project signs . Although the flares are 60 feet tall , the sign will only cover approximately the top 50 feet, given that the grade of the LTP/TDF site will be five to 20 feet below the proposed grade.

3. Wall Signs –Ph
ase III wall signs will be designed to conform to tenant design standards for color. Wall signs will be located on the front elevations of each building and in some instances on secondary elevations.

4. Digital Displays. An y sign permitted by the Specific Plan may include a digital display or electronic message board.

Page 105 of 245 ends

28 5. Sign Limitations – The purpose of the MSP is to ensure that sign designs are appropriate for the buildings, stores , and the surrounding context, contribute to the Spe cific Plan Area’s identity, and are visually attractive. The following limitations denote the Site’s sign approaches and types:
a. Tenant identification sign age may not extend above structure rooflines. b. Freestanding signs must be constructed of both individual channel letters and canned signs (only as tag line s). Wall signs will be constructed of individual channel letters with logos and tag lines, which may be constructed of canned signs with approval by the Director.
c. Signs may display only corporate identity. Secondary signs are allowed to display tenant’s general products or services offered such as: Garden Center, Installation, Pharmacy, etc.
d. Banners are limited to the first 30 days of a store opening within the Specific Plan Area. Additional special event and seasonal sales banners are permitted for a maximum of three times per year for a duration of 45 days each and once per year for a duration of 60 days per tenant. Banners may be approved by sign permit. e. Absent voter approval, all Offsite Signs including , without limitation, billboards , outdoor advertising structures, and electronic message boards, are prohibited pursuant to MPMC § 21.24.220.
f. All signs must comply with the lighting standards above.

I. REFUSE FACILITIES
For proper waste management practices, trash enclosures and/or equipment will be strategically located in the rear of each building, if feasible. Gates must be six-foot-high. Major tenants may have their own waste management areas within their building footprints to maintain the proper visual aesthetics of the Specific Plan Area. Public waste management wi ll be accomplished by placing on -site furniture , such as waste receptacles and ash urns, throughout the Site . To minimize solid waste generated by the Project, the following measures must be implemented:

1. Construction Phase – During Project construction, the following practices must be implemented to the maximum extent feasible:
a. Off-site l ocations for construction waste exported from the Site and options for disposal of excess material should be identified. These options may include recycling of materials on-Site, sale to a broker or contractor, sale to a project in the vicinity , or transport to an environmentally cleared landfill.

Page 106 of 245 ends

29 b. Individual Project applicant s should offer recyclable building materials , such as asphalt or concrete for sale or removal by private firms or public agencies for use in construction of other projects, if all cannot be reused on the Site.

2. Operation Phase – During Project operations, the following practices must be implemented, to the maximum extent feas ible, by the Project tenants within their buildings and will be specified in lease agreements between the Applicant and individual tenants:
a. Recovery of materials su ch as aluminum and cardboard; b. Collection of office paper for recycling;
c. Collection of polystyrene (foam) cups for recycling; d. Collection of glass , plastics, kitchen grease , laser printer toner cartridges, oil, batteries, and scrap metal for recycling or recovery.

3. Design Features – The Applicant(s), tenants, and/or owner(s) of the Specific Plan Area are required to implement design features to support solid waste reduction programs, such as:
a. Identifying the lo cation and design of on-site recycling facilities; b. Providing on-site recycling receptacles to encourage recycling; c. Facilitating cardboard recycling (especially in retail areas) by providing adequate space and centralized locations for collection and bailing; d. Providing trash compactors for non-recycling materials to reduce the total volume of solid waste and the number of trips required for collection; and e. Providing on-site recycling receptacles in feasible locations accessible to the public to encourage recycling for all businesses, employees, and patrons.

J. ACCESS AND CIRCULATION
The Specific Plan Area is accessible from Potrero Grande Drive, and Paramount Boulevard off of the Pomona Freeway. Market Place Drive serves as the main public/private roadway through the Specific Plan Area. See Figure 2.

K. TRIP REDUCTION AND TRAVEL DEMAND MEASURES
Reduction of trip and travel demand measures are provided in accordance with Applicable Law.

Before any development is approved within the Specific Plan Area, Applicant(s) must provide for all of the following applicable transportation demand management and trip reduction measures to promote better air quality. The Project must comply with the Development Standards for

Page 107 of 245 ends

30 Nonresidential Development of 100,000 square feet and also provide all of the following measures to the satisfaction of the Director and Public Works Director:

1. Displayed Information – A bulletin board, display case, or kiosk displaying transportation information located where the greatest number of employee s are likely to see it.

Information must include, without limitation, the following:
a. Current maps, r outes and schedules for public transit serving the Site; b. Telephone numbers for referrals on transportation information, including numbers for regional ridesharing agency and local transit operators; c. Ridesharing promotional materials supplied by commuter-oriented organizations; d. Bicycle route and facility information , including regional/local bicycle maps and bicycle information;
e. A list of facilities available for car- poolers, vanpoolers, bicyclists , transit riders and pedestrians at the Site.

2. Van Pool – Not less than 10% of employee parking area must be located as close as is practical to the employee entrance(s), and be reserved for use by potential carpool/vanpool vehicles, without displacing handicapped and customer parking needs.

A statement that preferential carpool/vanpool spaces for employees are available and a description of the method for obtaining such spaces must be included on the required transportation informati on board. Spaces will be signed/striped as demand warrants .

Adequate turning radii and parking space dimensions shall also be included in van pool parking areas.

3. Bicycles – Bi
cycle racks or other secure bicycle parking must be provided:
a. To accommodate four bicycles per the first fifty thousand square feet of nonresidential developments;
b. One bicycle per each additional fifty thousand square feet of nonresidential development. Calculations, which result in a fraction of 0.5 or higher, shall be rounded up to the nearest whole number;
c. Bicycle facilities, such as showers, lockers, and changing spaces, must be provided for every tenant employing more than 80 employees per shift, and separate facilities for all genders must be provided for tenants employing more than 160 employees per shift;
d. A bicycle parking facility may also be fully enclosed space or locker accessible only to the owner or operator of the bicycle, which protects the bike from inclement weather, e.g., racks, lockers, or locked room, must be provided.

Page 108 of 245 ends

31 4. Safety – A safe and convenient zone in which vanpool and carpool vehicles may deliver or board their passengers.

5. Sidewalks – Sid ewalks or other designated pathways following direct and safe routes must be maintained from the external pedestrian circulation system to each building in the development.

6. Circulation – S afe and convenient access must be maintained from the external circulation system to bicycle parking facilities on Site.

7. Employee Parking – Em ployee parkin g must be adequately provided within the total number of parking spaces planned for the Site . During peak shopping periods, off -site parking for employees may be instituted.

8. Roadway and Intersection Improvements –
Applicant(s) are responsible for on- site roadways and intersections improvements and off-site improvements (collectively, the Traffic Improvements) as required by the Director.

The Applicant(s) must seek approval for timely construction of the Traffic Improvements from all affected public entities, including the City of Montebello and CalTrans. Before the City issues a building permit for an y Individual Project , the Applicant must establish assurances, to the satisfaction of the City Engineer and/or other approving agencies, for the construction of the T raffic Improvements. Before the City issues a final certificate of occupancy, the Applicant must provide improvement design plans satisfactory to the City Engineer and/or other approving agencies and construct all the Traffic Improvements. For any Traffic Improvements under the jurisdiction of the City of Montebello and/or CalTrans that have not been completed before the Applicant seeks its first certificate of occupancy for an Individual Project , the C ity may issue a temporary certificate of occupancy, provided that the A pplicant first provides to the City written documentation confirming that another party committed sufficient funds for the construction of the Traffic Improvements required to be constructed at that time. Should the Applicant fail to provide such confirmation, the Applicant must place adequate funds (as mutually agreed upon by the Project applicant and the applicable entity) to fully construct such improvements in an escrow account to be used only for construction of the o ff-site improvements. Should the applicable entity does not approve plans to construct the off- site improvements within five years from the date the Applicant deposits such funds, any funds not being used to complete planned improvements will be returned to the Applicant.

Page 109 of 245 ends

32 L. PARKING

1. Supersedes MPMC Requirements . Where this Specific Plan contains language or standards that require more parking or permit less parking than the MPMC , this Specific Plan supersedes the MPMC.

2. Parking Requirements . Indi vidual Projects must provide parking in accordance with MPMC requirements for each proposed use, taking into account opportunities for shared parking with other proposed and existing uses and existing parking spaces.

3. Alternative-Fuel ed Vehicles. Preferential parking spaces for alternative -fueled vehicles, including electric vehicles and/or compressed natural gas, must be provided in the Site as required by Applicable Law . A minimum of two spaces must be equipped with vehicle recharging stations with both conductive and inductive charging capabilities. In no event, however, may the Site provide fewer vehicle charging stations than required by Applicable Law.

M. TRIP GENERATION
The Director must confirm that the number of a.m., p.m., and Saturday peak hour and daily trips for a proposed Individual Project , based on a trip generation memorandum prepared by the Applicant’s transportation engineer, to determine whether or not such trips would cause the Trip Cap to be cumulatively exceeded . The Applicant may receive a t rip credit for an existing or previous entitlement and/or use that was or will be discontinued.

Trips for an Individual Project having more than one use will be calculated by adding together the trips generated by the portion of floor area of the Project devoted to each use unless the Director, based on reasonable methods, determines otherwise.

The Applicant’s trip generation memorandum will be based on the then-current Institute of Transportation Engineers (ITE) Trip Generation Handbook, or such alternative rates determined to be appropriate by the Applicant’s transportation engineer and approved by the Director. The determination of trips will reflect diverted and pass-by traffic trips, the effect of interaction of on-site mixed -use development, the proximity of the Project to mass transit facilities, and implementation of other transportation demand management measures.

If the Director disagrees with any of the trip generation factors as applied to an Individual Project, the Applicant may submit a proposed alternative trip generation factor for the Project, along with a traffic generation study prepared by transportation engineer, for review by the Planning Agency. Upon receiving such a study from the Applicant, the Director will cause the City Clerk to schedule a public hearing before the Monterey Park Planning Agency in accordance with the MPMC. Within 45 days after conducting a public hearing, the Planning Agency will issue written

Page 110 of 245 ends

33 findings that approve, disapprove , or conditionally approve the proposed alternative Trip generation factor as the Trip generation factor for the Individual Project.

VI. INDIVIDUAL PROJECT APPROVALS
A. PROJECT CLEARANCES AND ADMINISTRATIVE DESIGN REVIEW

1. Unless otherwise exempt, an Applicant must obtain a Project Clearance from the Director before the City issues any permit for an Individual Project.

2. The Director will issue a Project Clearance if the Individual Project is in substantial conformance with applicable provisions of this Specific Plan and other Applicable Law and the applicable mitigation measures from the SEIR in Appendix A.

3. The Applicant must pay the necessary fees consistent with the provisions of this Specific Plan and other Applicable Law.

4. The Director will approve, without change or modification, an Individual Project if it is substantially consistent with a Conceptual Development Plan and the design requirements of this Specific Plan. An Applicant may submit an alternative site plan, which the Director will review as provided in Section A.2 above.

5. The Director’s approval of an Individual Project also constitute s an administrative clearance of design review pursuant to MPMC § 21.36.060.

6. Should the Director determine that an Individual Project is in consistent with the Conceptual Development Plans or other requirements of the Specific Plan other than design requirements, the Director must provide detailed written findings as to any inconsistency to the Applicant. The Applicant may revise and resubmit the application or appeal the Director’s decision as provided in Chapter VIII below.

7. If the Director determines that an Individual Project is inconsistent, or is unable to determine consistency, with the design requirements of the Specific Plan, the Director may refer the matter to the Design Review Board or Planning Commission to consider in accordance with the design review provisions of the MPMC . The Design Review Board may make recommendations to the Planning Commission , or the Planning Commission may, on its own authority, determine consistency with the design requirements of the Specific Plan. The Applicant may revise and resubmit to the Director for reconsideration of any design found to be inconsistent or appeal the decision as provided in Chapter VIII below

Page 111 of 245 ends

34 B. DIRECTOR’S REVIEW
The Director’s review and approval of a Project Clearance is an administrative clearance . The Director will act within 30 days after receiving an application for an Individual Project. If the Director fails to act within 30 days, the Individual Project is deemed approved. In approving a Project Clearance, the Director may impose conditions of approval as deemed necessary and those conditions of approval and SEIR mitigation measures set forth in Exhibit 1 that are applicable to the Individual Project. None of the actions by the Director under this Section VI are considered to be discretionary or require any CEQA review.

C. ADVISORY DETERMINATION
An Applicant may request, at the Applicant’s cost, that the Director conduct a preliminary review of an Individual Project application for an advisory non-binding determination of compliance with the provisions contained in this Specific Plan.

D. RIGHTS GRANTED UNDER PROJECT CLEARANCE
A Project Clearance indicates compliance with this Specific Plan and the Applicable Law.

E. PROJECT CLEARANCE EXPIRATION
A Project Clearance, including a design review consistency approval granted in accordance with the MPMC for an Individual Project, expires 36 months after the approval date unless within such period physical construction of the Individual Project is commenced and/or the beginning of the authorized use commenced, or the City grants a time extension in accordance with this Section.

The Director may grant a one-year extension, for good cause shown, before the initial time period expires.

VII. ADMINISTRATION OF SPECIFIC PLAN
A. DIRECTOR AUTHORITY

1. The Director may implement this Specific Plan in accordance with Applicable Law.

2. The Director may interpret this Specific Plan. In the event that a specific use or type of use is not listed as a permitted use, the Director may determine whether the proposed use is similar to a permitted use and whether the use is permitted, permitted subject to conditions, permitted as a temporary use, or prohibited. In determining “similarity,” the Director must make all of the following findings:

Page 112 of 245 ends

35 a. The proposed use meets the intent of, and is consistent with, the goals, objectives and policies of the general plan and the Specific Plan;
b. The proposed use does not adversely impact the public health, safety , and general welfare of the City’s residents; and
c. The proposed use shares characteristics common with, and is not of greater intensity or density or does not generate more env ironmental impacts than, those uses listed in the permitted uses section.

B. AMENDMENTS

1. This Specific Plan may be amended in the same manner as required for the adoption of Specific Plan.

2. The following changes to a Specific Plan require a Specific Plan amendment:
a. Changes to the text or maps other than (i) the addition of information that does not change the effect of any regulation , or (ii) changes to a Conceptual Plan that are in substantial conformance with the Specific Plan.
b. Changes in any Specific Plan Area boundary.
c. Increases in the specified density for the Specific Plan Area , except as expressly authorized under the Specific Plan.
d. Increases in Trip Caps.
e. Changes in standards or regulations, including landscaping and design standards , e
xcept to the extent the changes constitute a Minor Modification, as set forth in MPMC § 21.32.030.

C. ADMINISTRATIVE MODIFICATIONS

1. The Director is authorized to make technical corrections, in a form approved by the City Attorney, to maps, diagrams, tables, and other similar documents that may be required to reconcile the changes made by this Specific Plan and Applicable Law.

2. In addition, the Director is authorized to make the following technical amendments, in a form approved by the City Attorney:
a. Realignment or modifications to internal streets serving the project, lot lines, easement locations, and grading adjustments, if approved by the City Engineer. b. Minor modification to design criteria such as paving treatments, architectural details, and related criteria.
c. Minor modification to landscape treatments, fencing, lighting, pedestrian paths , and entry treatments, provided the modifications are in substantial conformance with the

Page 113 of 245 ends

36 purpose and intent of the specified design criteria.

D. TIME LIMITS
Any time limit established by this Specific Plan may be extended by mutual agreement between the applicant and the Director, the Planning Agency, or the City Council, as the case may be. Any time limit must be extended to the extent of force majeure events.

VIII. APPEALS
A. APPEALS

1. Appeal of Director actions. The Applicant may appeal any final action or decision of the Director regarding design review to the Planning Agency.

2. Appeal of Planning Commission actions . The Applicant may appeal any final action or decision of the Planning Commission to the City Council.

IX. CONDITIONS OF APPROVAL AND MITIGATION MEASURES
A. CONDITIONS OF APPROVAL AND MITIGATION MEASURES
The conditions of approval, and the Mitigation Monitoring and Reporting Program adopted for the Specific Plan, both of which are included in Exhibit 1, are incorporated by reference, and are part of this Specific Plan, as if set forth in full in this Section IX.

Page 114 of 245 ends

37 LIST OF FIGURES AND EXHIBITS
Figures
Figure 1: Specific Plan Area
Figure 2: Market Place Aerial – Local Access
Figure 3: Concept Infrastructure
Figure 4A: Option A – Last Mile Distribution Center
Figure 4B: Option B – Warehouse
Figure 4C: Option C – Automobile Dealership
Figure 4D: Option D – Retail
Figure LU-1: Land Use Planning Area (2020 Land Use Element) Figure LU-4: Land Use Policy Map (2020 Land Use Element Figure C-4: Bicycle Route Plan (2001 Circulation Element) Exhibits
Exhibit B: Mitigation Monitoring Program

Page 115 of 245 ends

ENTRANCE
EXIT
A1

COMPACTOR

COMPACTOR
T

NO PARKING
SOP
RETAIL "A"FUEL CENTER
156,450 S.F.

FF=398.50
RETAIL "A"

EXISTING LTP

TO REMAIN
BUS
VAN
VAN
TSOP
MPPD
64SF
40SF
89SF
28SF
86SF
35SF

EMPLOYEECARPOOL AND

VANPOOL
48SF
40SF
VAN
SDMH
SDMH
SDMH
SDMH
25SF
MPPD
40SF
40SF
40SF
51SF
63SF

EMPLOYEECARPOOL AND

VANPOOL
145SF
145SF
130SF
50SF
34SF
VAN
60SF

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV
CVEV

CARPOOL/VANPOOL/
EV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV
CVEV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
FEV
FUTURE

ELECTRICVEHICLE
FEV
FUTURE

ELECTRICVEHICLE
FEV
FUTURE

ELECTRICVEHICLE
FEV
FUTURE

ELECTRICVEHICLE
FEV
FUTURE

ELECTRICVEHICLE
FEV
FUTURE

ELECTRICVEHICLE
FEV
FUTURE

ELECTRICVEHICLE
FEV
FEV
FUTURE

ELECTRICVEHICLE
FUTURE

ELECTRICVEHICLE FEV
FUTURE

ELECTRICVEHICLE FEV
FUTURE

ELECTRICVEHICLE FEV
FUTURE

ELECTRICVEHICLE FEV
FEV
CVEV
FUTURE

ELECTRICVEHICLE FEV
FUTURE

ELECTRICVEHICLE FEV

CARPOOL/VANPOOL/
EV
FUTURE

ELECTRICVEHICLE FEV
FUTURE

ELECTRICVEHICLE

CARPOOL/

VANPOOL/
EV

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/VANPOOL/
EV
CVEV
CVEV

CARPOOL/

VANPOOL/
EV

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV
CVEV

CARPOOL/VANPOOL/
EV

CARPOOL/VANPOOL/
EV
CVEV
CVEV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV

CARPOOL/VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV

CARPOOL/

VANPOOL/
EV
CVEV
CVEV

CARPOOL/VANPOOL/
EV
FEV
FEV
FEV
FUTURE

ELECTRICVEHICLE
EV
AEV
AEV
FEV
FUTURE

ELECTRICVEHICLE
FEV
FUTURE

ELECTRICVEHICLE
FEV
FUTURE

ELECTRICVEHICLE FEV
FUTURE

ELECTRICVEHICLE
FUTURE

ELECTRICVEHICLE
T.E.

RETAIL "B"10,982 S.F.

FF=394.50
FEVFEV

FAEVFEV

UP LOBBYASR
45 SF
ELEC. RM.
210 SF
UP

RESTROOM
MEN'S

RESTROOM

WOMEN'S

MARKET PLACE DRIVECL
JOB NO:

DATE:

REVISION #:

CHECKED:

DATE:

DATE:

OF
NO. DESCRIPTION BY DATE CHK DRAWN:

REVISIONS
NO. DESCRIPTION BY DATE CHK 701 N. Parkcenter Drive
Santa Ana, CA 92705
p: 714/560/8200 f: 714/560/8211
www.tait.com
Since 1964
Los Angeles
Ontario
Sacramento
San Diego
San Francisco
Boise
Dallas
Denver
Phoenix
Portland
701 N. Parkcenter Drive
Santa Ana, CA 92705
p: 714/560/8200 f: 714/560/8211
www.tait.com
Since 1964
Los Angeles
Ontario
Sacramento
San Diego
San Francisco
Boise
Dallas
Denver
Phoenix
Portland
2 MONTEREY PARK MARKETPLACE

GREENWOOD AVE AND MARKETPLACE DR

MONTEREY PARK, CA

MONTEREY PARK RETAIL PARTNERS, LLC
1260 STELTON ROAD
PISCATAWAY, NEW JERSEY 08854
N

OVERALL UTILITY EXHIBIT
1 MATCH LINE - SEE SHEET 2 MATCH LINE - SEE SHEET 2

UTILITY LEGEND
FIGURE 3 (PAGE 1 OF 2)

Page 116 of 245 ends

RETAIL "D"

OUTDOOR

GARDEN CENTER
YIELD
MPPD
106,299 S.F.

FF=400.75
28,118 S.F.

RETAIL "A"FUEL CENTER
Tectonic Copyright 2007
Tectonic Copyright 2007
VAN
VAN
VAN
PAD 4
3,867 S.F.

RESTAURANTFF=411.00
BUS
86SF
MPPD
19SF
50SF
48SF
64SF
66SF
52SF
30SF
125SF
47SF
44SF
45SF

EMPLOYEE

CARPOOL ANDVANPOOL

EMPLOYEE

CARPOOL ANDVANPOOL

EMPLOYEE

CARPOOL ANDVANPOOL

EMPLOYEE

CARPOOL AND

VANPOOL

EMPLOYEE

CARPOOL AND

VANPOOL

EMPLOYEE

CARPOOL AND

VANPOOL

EMPLOYEE

CARPOOL AND

VANPOOL
VAN
SDMH
SDMH
SDMH
SDMH
FF=395.50PAD=394.67
MPPD
52SF
19SF
50SF
66SF
38SF
165SF
185SF
40SF
44SF
40SF
50SF
246SF
135SF

EMPLOYEE

CARPOOL ANDVANPOOL

EMPLOYEE

CARPOOL AND

VANPOOL

EMPLOYEE

CARPOOL AND

VANPOOL
20SF
40SF
95SF
44SF
NO

PARKING
19SF
4,526 S.F.

PAD 3

RESTAURANT
FF=408.60
19SF
YIELD
VAN
FEV
FUTURE

ELECTRICVEHICLE
FUTURE

ELECTRICVEHICLE
FEV
FUTURE

ELECTRICVEHICLE
FEV
FUTURE

ELECTRICVEHICLE
FEV
FEV
FUTURE

ELECTRICVEHICLE
FEV
FUTURE

ELECTRICVEHICLE
FUTURE

ELECTRICVEHICLE
FEV
FUTURE

ELECTRICVEHICLE
FEV
FEV
FUTURE

ELECTRICVEHICLE
FUTURE

ELECTRICVEHICLE
FEV
FEV
FUTURE

ELECTRICVEHICLE
FUTURE

ELECTRICVEHICLE
FEV
FUTURE

ELECTRICVEHICLE FEV
FUTURE

ELECTRICVEHICLE FEV
FUTURE

ELECTRICVEHICLE
FUTURE

ELECTRICVEHICLE
FEV
FEV
FUTURE

ELECTRICVEHICLE FEV
FUTURE

ELECTRICVEHICLE FEV
FUTURE

ELECTRICVEHICLE FEV
FEV
69SF

EMPLOYEE

CARPOOL AND

VANPOOL
PAD 2B2,700 S.F.

EMPLOYEE

CARPOOL AND

VANPOOL
VAN
CA/EV
CA/EV
CA
CA
30SF
25SF
SBX
290 S.F. PATIO
1050 S.F.PATIO
CA
CA/EV
CA/EV
CA/EV
FEV
FUTURE

ELECTRICVEHICLE
CA/EV
AEV
CA/EV
CA/EV
CA/EV
FEV
CA/EV
CA/EV
CA/EV
CA CA
CACA
CA/EV
CA/EV
CA/EV

LOADING ZONE

NO PARKING
CA/EV
CA/EV
CA/EV
CA
CA
CA
CA/EV
CA/EV
CA/EV
CA/EV
CA/EV
CA/EV
CA/EV
CA/EV
CA/EV
27SF

LOADING ZONE

NO PARKING

LOADING ZONE

NO PARKING
FUTURE

ELECTRICVEHICLE
KEEP
CLEAR
KEEP
CLEAR

RIGHTTURN
ONLY
FEV

VEHICLE
FUTURE

ELECTRICVEHICLE
FEV
FUTURE

ELECTRICVEHICLE
VAN
PAD 2A4,300 S.F.
16SF
PAD 1
VAN
9,777 S.F.

FF=404.25
BWW
VAN
15,000 S.F.

FF=400.50
RETAIL "C"

FEVFEVFAEV
FEV
FAEV
FEV
FEV
FEV
FEV
FEV
FEV
FEV
FEV
FEV
FAEV
FAEV
FEV
FEV
FEV
PAD=409.92
PAD=407.60
T.E.

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED
FF=405.00
FF=405.35

DO NOT ENTER
KEEP
CLEAR
KEEP
CLEAR
66SF
84SF

FEVFEVFEV

EMPLOYEECARPOOL AND

VANPOOLEMPLOYEECARPOOL AND

VANPOOLMPPD
KEEP
CLEAR
JOB NO:

DATE:

REVISION #:

CHECKED:

DATE:

DATE:

OF
NO. DESCRIPTION BY DATE CHK DRAWN:

REVISIONS
NO. DESCRIPTION BY DATE CHK 701 N. Parkcenter Drive
Santa Ana, CA 92705
p: 714/560/8200 f: 714/560/8211
www.tait.com
Since 1964
Los Angeles
Ontario
Sacramento
San Diego
San Francisco
Boise
Dallas
Denver
Phoenix
Portland
701 N. Parkcenter Drive
Santa Ana, CA 92705
p: 714/560/8200 f: 714/560/8211
www.tait.com
Since 1964
Los Angeles
Ontario
Sacramento
San Diego
San Francisco
Boise
Dallas
Denver
Phoenix
Portland
2 MONTEREY PARK MARKETPLACE

GREENWOOD AVE AND MARKETPLACE DR

MONTEREY PARK, CA

MONTEREY PARK RETAIL PARTNERS, LLC
1260 STELTON ROAD
PISCATAWAY, NEW JERSEY 08854
N

OVERALL UTILITY EXHIBIT
2 MATCH LINE - SEE SHEET 2 MATCH LINE - SEE SHEET 2

MATCH LINE - SEE BOTTOM LEFT

MATCH LINE

SEE TOP RIGHT

UTILITY LEGEND
FIGURE 3 (PAGE 2 OF 2)

Page 117 of 245 ends

TSOP

EXISTING LTPTO REMAIN
TSOP
64SF
35SF
48SF
40SF
60SF
CVEV
CVEV

CARPOOL/VANPOOL/
EV

CARPOOL/VANPOOL/
EV

CARPOOL/VANPOOL/

EV CVEV

CARPOOL/VANPOOL/
EV
CVEV
CVEV

CARPOOL/VANPOOL/
EV

TSOPTSOP
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'

XXXXXXXXXXXXXXX XXXXXX XXXXXX
261'-3"
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'
Armada Van
24' x 8'

DO NOT ENTER
57'-0"47'-0"50'-0"58'-0"47'-0"47'-0"59'-0" 57'-0"
UP
UPDN
UP
UPDN
UP
UP DN
UP
UP DN
190
25 375'-0"
140'-0"
60'-0" 80'-0"
6 32
26 23
15 12
3 18
15 5
12 VAN
23 FIRE LANE

FIRE LANE
OFFICE
DO NOT
ENTER
UP
DN
WB-67
WB-67
WB-67
WB-67
WB-67
WB-67
WB-67
WB-67
WB-67

MARKET PL DR
1 26'-0"18'-0"18'-0"26'-0"18'-0"18'-0"26'-0"18'-0"18'-0"26'-0" 8'-0"
18'-0"
18'-0"
6'-6"
26'-0"
18'-0"
26'-0"
18'-0"
18'-0"
26'-0"
20'-0" 26'-0"
9'-0" TYP.
8'-0"8'-0"
30'-0" 27'-0"27'-0"
11'-0" TYP.

SIDEWALK
(VAN DRIVER ACCESS TO BUILDING)
30'-0"
42'-0"
40'-0"
35'-0"
27'-4"
11'-4"
24'-0"24'-0"
54'-0"
30'-0"
49'-6"40'-0"48'-2"
29'-8"
13'-0"
13'-6"
30'-0"
100'-0"Ø
13'-6"
30'-0"
30'-0"
2 38'-10"
12'-4"
24'-0"
3 4

ASSOCIATE TRAFFIC FLOW DIRECTION

DSP/FLEX TRAFFIC FLOW DIRECTION

DSP/FLEX RETURN TRAFFIC FLOW DIRECTION

TRUCK TRAFFIC FLOW DIRECTION

VAN PERSONAL TRAFFIC FLOW DIRECTION
ASSOCIATE DRIVE AISLE = 26'-0" PER CITY STANDARDS
(24'-0" TYPICAL)
CLEARANCE BEHIND LAST QUEUING PAD = 49'-6" DUE TO SITE CONSTRAINTS. (±71'-0" TYPICAL)
CLEARANCE IN FRONT OF FIRST LAUNCH PAD = 48'-2" DUE TO SITE CONSTRAINTS. (70'-2" TYPICAL)

ALTERNATE BYPASS LANE/QUEUING CONFIGURATION USED DUE TO SITE CONSTRAINTS.
1 2
3 4
MARKETPLACE DR.

MONTEREY PARK, CA 91755
Project Number:
© 2020 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.

Plan Check Number:

SEAL
v6.6

CONSULTANT

MONTEREY PARK

DELIVERY STATION
dellacJun/28/2021 10:53 PMborder last saved: by:
2021-241xxxx

MONTEREY PARK
SCALE: 1" = 40'-0"
This conceptual design is based upon a preliminary review of entitlement requirements and on unverified and possibly incomplete site and/or building information, and is intended merely to assist in exploring how the project might be developed. 1 SITE CONCEPT - OVERALL SITE PLAN1"=40'-0"
N
0 5' 20' 40' 60'10'80'
40'
dellacJun/28/2021 10:53 PMdwg last saved: by:

S H E E T
sheet plotted:
drawing file name:

Jun/28/2021 @ 10:54 PM
p:\2021-241 jmp - monterey park\design\site design\monterey park_multi level layout_2021-06-24.dwg FIGURE 4A
(Page 1 of 2)
2 TRAFFIC FLOW LEGENDN.T.S.
3 SITE DESIGN INFORMATIONN.T.S.
4 PARKING BREAKDOWNN.T.S.
5 DEVIATIONS FROM PROTOTYPE STANDARDSN.T.S.

Page 118 of 245 ends

ONE-WAY RAMP (UP) ONE-WAY RAMP (DN)
DN
DO NOT
ENTER
DO NOT
ENTER
UP
UP DN
UP
UPDN
UP
UP
UPDN
14'-6 wide
transition
zone/ramp
14'-6 wide
transition
zone/ramp
UP
UP DN
UP
DN
30'-0"27'-0"
4'-0"
27'-0"33'-1012"27'-0"
4'-0"
27'-0"30'-0"27'-0"
4'-0"
27'-0"30'-0"27'-0"
4'-0"
30'-0" 27'-0"
4'-0"
30'-0"
30'-0"30'-0"
24'-0"30'-0"30'-0"
4'-0"
21'-0"
21'-0"

ONE-WAY RAMP (UP) ONE-WAY RAMP (DN)
DN
DO NOT
ENTER
DO NOT
ENTER
UP
UP DN
UP
UPDN
UP
UP
UPDN
14'-6 wide
transition
zone/ramp
14'-6 wide
transition
zone/ramp
UP
UP DN
27'-0"30'-0"27'-0"
4'-0"
4'-0"
27'-0"30'-0"27'-0"
4'-0"
27'-0"30'-0"27'-0"
4'-0"
27'-0"
4'-0"
30'-0"27'-0"
4'-0"
30'-0"
30'-0"
24'-0"
24'-0"
30'-0"
21'-0"
21'-0"
27'-0"30'-0"
11'-0" TYP.

ONE-WAY RAMP (UP) ONE-WAY RAMP (DN)
UP
DN
DO NOT
ENTER
DO NOT
ENTER
61 UP
UPDN
UP
UPDN
UP
UP DN
UP
UP DN
UP
DN
27'-0" 30'-0" 27'-0"
11'-0" TYP.
24'-0"
21'-0"
31'-2" 30'-0"
21'-0"
4'-0"
4'-0"

ASSOCIATE TRAFFIC FLOW DIRECTION

DSP/FLEX TRAFFIC FLOW DIRECTION

DSP/FLEX RETURN TRAFFIC FLOW DIRECTION

TRUCK TRAFFIC FLOW DIRECTION

VAN PERSONAL TRAFFIC FLOW DIRECTION
ASSOCIATE DRIVE AISLE = 26'-0" PER CITY STANDARDS
(24'-0" TYPICAL)
CLEARANCE BEHIND LAST QUEUING PAD = 49'-6" DUE TO SITE CONSTRAINTS. (±71'-0" TYPICAL)
CLEARANCE IN FRONT OF FIRST LAUNCH PAD = 48'-2" DUE TO SITE CONSTRAINTS. (70'-2" TYPICAL)

ALTERNATE BYPASS LANE/QUEUING CONFIGURATION USED DUE TO SITE CONSTRAINTS.
1 2
3 4
MARKETPLACE DR.

MONTEREY PARK, CA 91755
Project Number:
© 2020 Architects Orange, LLP dba AO These plans are copyright protected. Under such protection unauthorized use is not permitted. These plans shall not be reproduced or used without written permission by AO.

Plan Check Number:

SEAL
v6.6

CONSULTANT

MONTEREY PARK

DELIVERY STATION
dellacJun/28/2021 10:54 PMborder last saved: by:
2021-241xxxx

MONTEREY PARK
SCALE: 1" = 40'-0"
This conceptual design is based upon a preliminary review of entitlement requirements and on unverified and possibly incomplete site and/or building information, and is intended merely to assist in exploring how the project might be developed. 1B VAN PARKING LEVEL 21"=40'-0"
N
0 5' 20' 40' 60'10'80'
40'
dellacJun/28/2021 10:54 PMdwg last saved: by:

S H E E T
sheet plotted:
drawing file name:

Jun/28/2021 @ 10:56 PM
p:\2021-241 jmp - monterey park\design\site design\monterey park_multi level layout_2021-06-24.dwg 1A VAN PARKING LEVEL 11"=40'-0"
1C VAN PARKING LEVEL 3 (ROOF)1"=40'-0"
2 TRAFFIC FLOW LEGENDN.T.S.
3 SITE DESIGN INFORMATIONN.T.S.
4 PARKING BREAKDOWNN.T.S.
5 DEVIATIONS FROM PROTOTYPE STANDARDSN.T.S.

FIGURE 4A
(Page 2 of 2)

Page 119 of 245 ends

01 Scale
Job No.

Date

MONTEREY PARK INDUSTRIAL
Monterey Park, Ca 91755
M&M
REALTY
PARTNERS 1”=100’-0”
2021-241
2021-07-20

EXISTING LTPTO REMAIN
60 POMONA FREEWAY
663'
404'
153 SPACES
159'
3,000 S.0 S.F.0 S.0 S.
18 SPACESSPSPSPSPSSS
249'
14 SPACES
32 SPACES2 32332
00 3
4 2
172,000 FP +3,000 MEZZ
0 Z
175,000 S.F.
555
000

OFOFFOFOF
FICEF
G.D.

G.D. G.D.

C
34 SPACES

SERVICE YARD

SERVICE YARD

SSSSSSS
33333344SSSSS DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD
04444444404444

SSSSSSSSSSS
32 S3233
(30' ACCESS EASEMENT)

SEMENT)
ENT)
T)

INDUSTRIAL FACILITY
Site Plan
FIGURE 4B

Page 120 of 245 ends

GREENWOOD

GRANDE DR

POTRERO
BLVD.PARAMOUNT WB OFF-RAMP
60-FWY WB
60-FWY EB

EB ON-RAMP

WB ON-RAMP

MARKET PLACE DR
WB ON-RAMP60-FWY WB
60-FWY EB
RETAIL "D"

OUTDOOR

GARDEN CENTER
YIELD
MPPD
106,299 S.F.

FF=400.75
28,118 S.F.

T

NO PARKING
SOP
RETAIL "A"FUEL CENTER
156,450 S.F.

FF=398.50
RETAIL "A"
VAN

EXISTING LTP

TO REMAIN

VAN VAN
PAD 43,867 S.F.

RESTAURANT
FF=411.00
BUS
BUS
VAN
VAN
TSO
86SF
P
MPPD
MPPD
19SF
50SF
48SF
64SF
64SF
66SF
52SF
30SF
40SF
125SF
47SF
44SF
89SF
45SF
28SF
86SF
35SF
48SF
40SF
VAN
VAN
SDMH
SDMH
SDMH
SDMH
SDMH
SDMH
66SF
SDMH
SDMH
FF=395.50PAD=394.67
MPPD
52SF
25SF
MPPD
19SF
50SF
66SF
38SF
165SF
40SF
40SF
40SF
185SF
40SF 44SF 40SF
50SF
246SF
135SF
51SF
63SF
20SF
40SF
145SF
145SF
95SF
130SF
50SF
34SF
44SF
NO

PARKING
19SF
4,526 S.F.PAD 3

RESTAURANT
FF=408.60
19SF
YIELD
VAN
VAN
60SF
69SF
PAD 2B2,700 S.F.

VAN
30SF
25SF
SBX
290 S.F. PATIO
1050 S.F.

PATIO
27SF
KEEP

CLEARKEEP
CLEAR

RIGHTTURNONLY
T.E.

RETAIL "B"16,471 S.F.

VAN
PAD 2A4,300 S.F.
16SF
PAD 1
VAN
9,777 S.F.FF=404.25
BWW
VAN
15,000 S.F.

FF=400.50
RETAIL "C"
84SF
MPPD

6.00'

18.00' 12.84'

19.00'

25.67'
PAD=409.92
PAD=407.60
T.E.

RESERVEDRESERVEDRESERVEDRESERVEDRESERVEDRESERVEDRESERVEDRESERVEDRESERVEDRESERVEDRESERVEDRESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED
FF=405.00
FF=405.35
UP
LOBBY
ASR45 SF
ELEC. RM.210 SF
UP

8.33'

6.19'

13.76'

DO NOT ENTER
KEEP
CLEAR
KEEP
CLEAR
KEEP
CLEAR

NO PARKING
CLEAN AIR V.
3,192 SF
47SF
33SF
FUTURE E.V.

FUTURE E.V.

ACCESS ISLE
TSOP
TSOP
60 POMONA FREEWAY
SDMH
MARKET PLACE DR.

SERVICE AREA
95,000 S.F.

AUTO DEALERSHIP
60 POMONA FREEWAY
A1A1

COMPACTOR

COMPACTOR

MATCH LINE

MATCH LINE

SEE BELOW LEFT

MATCH LINE
FIGURE 4C

MONTEREY PARK MARKET PLACE

MONTEREY PARK, CA
PARK

MONTEREY

VICINITY MAP

MATCH LINE

SEE BELOW LEFT

Page 121 of 245 ends

RETAIL "D"

OUTDOOR

GARDEN CENTER
YIELD
MPPD
106,299 S.F.

FF=400.75
28,118 S.F.

T

NO PARKING
SOP
RETAIL "A"FUEL CENTER
156,450 S.F.

FF=398.50
RETAIL "A"
VAN

EXISTING LTP

TO REMAIN

VAN VAN
PAD 43,867 S.F.

RESTAURANT
FF=411.00
BUS
BUS
VAN
VAN
TSO
86SF
P
MPPD
MPPD
19SF
50SF
48SF
64SF
64SF
66SF
52SF
30SF
40SF
125SF
47SF
44SF
89SF
45SF
28SF
86SF
35SF

EMPLOYEE

CARPOOL AND

VANPOOL

EMPLOYEECARPOOL AND

VANPOOL

EMPLOYEE

CARPOOL AND

VANPOOL

EMPLOYEE

CARPOOL AND

VANPOOL

EMPLOYEE

CARPOOL ANDVANPOOL

EMPLOYEE

CARPOOL ANDVANPOOL

EMPLOYEE

CARPOOL ANDVANPOOL

EMPLOYEE

CARPOOL ANDVANPOOL
48SF
40SF
VAN
VAN
SDMH
SDMH
SDMH
SDMH
SDMH
SDMH
66SF
SDMH
SDMH
FF=395.50PAD=394.67
MPPD
52SF
25SF
MPPD
19SF
50SF
66SF
38SF
165SF
40SF
40SF
40SF
185SF
40SF 44SF 40SF
50SF
246SF
135SF
51SF
63SF

EMPLOYEE

CARPOOL AND

VANPOOL

EMPLOYEECARPOOL AND

VANPOOL

EMPLOYEE

CARPOOL ANDVANPOOL

EMPLOYEE

CARPOOL ANDVANPOOL
20SF
40SF
145SF
145SF
95SF
130SF
50SF
34SF
44SF
NO

PARKING
19SF
4,526 S.F.PAD 3

RESTAURANT
FF=408.60
19SF
YIELD
VAN
VAN
60SF
69SF

EMPLOYEE

CARPOOL ANDVANPOOL
PAD 2B2,700 S.F.

EMPLOYEE

CARPOOL ANDVANPOOL
VAN
30SF
25SF
SBX
290 S.F. PATIO
1050 S.F.

PATIO

LOADING ZONE

NO PARKING
27SF

LOADING ZONE

NO PARKING

LOADING ZONE

NO PARKING
KEEP

CLEARKEEP
CLEAR

RIGHTTURNONLY
T.E.

RETAIL "B"16,471 S.F.

VAN
PAD 2A4,300 S.F.
16SF
PAD 1
VAN
9,777 S.F.FF=404.25
BWW
VAN
15,000 S.F.

FF=400.50
RETAIL "C"
84SF

EMPLOYEECARPOOL AND

VANPOOLEMPLOYEECARPOOL AND

VANPOOL
MPPD

6.00'

18.00' 12.84'

19.00'

25.67'
PAD=409.92
PAD=407.60
T.E.

RESERVEDRESERVEDRESERVEDRESERVEDRESERVEDRESERVEDRESERVEDRESERVEDRESERVEDRESERVEDRESERVEDRESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED
FF=405.00
FF=405.35
UP
LOBBY
ASR
45 SF
ELEC. RM.210 SF
UP

8.33'

6.19'

13.76'

DO NOT ENTER
KEEP
CLEAR
KEEP
CLEAR
KEEP
CLEAR

NO PARKING
CLEAN AIR V.
3,192 SF
47SF
33SF
FUTURE E.V.

FUTURE E.V.

ACCESS ISLE
TSOP
TSOP
SDMH

MARKET PLACE DR

MARKET PLACE DR

MARKET PLACE DRIVE
60 POMONA FREEWAY
A1A1

COMPACTOR

COMPACTOR
RETAIL150,000 S.F.

LOADING
206'
592'
112'
492'
259'

GREENWOOD

GRANDE DR

POTRERO
BLVD.PARAMOUNT WB OFF-RAMP
60-FWY WB
60-FWY EB

EB ON-RAMP

WB ON-RAMP

MARKET PLACE DR
WB ON-RAMP60-FWY WB
60-FWY EB

MATCH LINE

MATCH LINE

SEE BELOW LEFT

MATCH LINE
FIGURE 4D

MONTEREY PARK MARKET PLACE

MONTEREY PARK, CA
PARK

MONTEREY

VICINITY MAP

MATCH LINE

SEE BELOW LEFT

Page 122 of 245 ends

6 CONTEXT | Monterey Park Land Use and Urban Design Element Æ2Æ2Æ2
East Los Angeles College
California State University,
Los Angeles
§¨¦
710
§¨¦
710
@z
@z
§¨¦
10 §¨¦
10 South
San Gabriel
East Los Angeles
El Sereno

CITY OF

ALHAMBRA

CITY OF

MONTEBELLO

CITY OF

ROSEMEAD

CITY OF

LOS ANGELES

CITY OF

SAN GABRIEL

CITY OF

MONTEBELLO

LOS ANGELES
COUNTY
Alhambra Was
h
Luguna Channel
Luguna Channel
Garvey Reservoir
Saturn S
t
E Riggi
n St
S Wil
cox A
ve
S Orange Ave
Crest Vista D
r
W Verde Vista Dr
S Bradshawe
Ave
W
Elmgate
St
Brightwo
od St
Jackson Ave
Sheriff Rd
E Gra
ve
s Ave
Del Mar Ave
S Atlantic Blvd
E 3rd St
S Garfield Ave
S Fremont Ave
W Valley Blvd
Emerson Pl
Hellman
Av
e
W Floral Dr
E G
arvey
Av
e
E Em
ers
on
Ave
N Mo
ntebello B
lvd
W Pomona
Blvd
N New Ave
N Garfield Ave
Mo
nterey
Pass Rd
N Findlay Ave
N Wilcox Ave
S New Ave
W Emerson Ave
Corporate Center Dr
Cesar E Cha
vez Av
e
N Paramount Blv
d
E Hel
lman A
ve
S Mednik Ave
W New
mark Av
e
N Mednik Ave
N Atlantic Blvd
W Lincoln
Ave
E Pomona Blvd
S Alhambra AveN Alhambra Ave
Hill
Dr
S Almansor St
Findlay Ave
Garvey Av
e
Potr
ero Grand
e Dr
Potrero
Grande Dr
W Garvey Ave
N San Gabriel Blvd
S Atlantic Blvd
W Hellman Ave
N Garfield Ave
E B
everl
y Blv
d
S Garfield Ave
W Beverly
Blv
d
S Atlantic Blvd
W Riggin St
° 0 ½1¼
Mile
October 2019
Sources: Los Angeles County Assessor, 2019.

Resurrection Cemetery
Planning Area
City of Monterey Park (Incorporated)
Sphere of Influence (Unincorporated)
FIGURE LU-1:

PLANNING AREA
Base Map Features
Monterey Park Boundary
Sphere of Influence Boundary
Metro Gold Line and Stations
Water Courses
Waterbodies
Æ2

Page 123 of 245 ends

24 LAND USE PLAN | Monterey Park Land Use and Urban Design Element Æ2Æ2Æ2
East Los Angeles College
California State University,
Los Angeles
§¨¦
710
§¨¦
710
@z
@z
§¨¦
10 §¨¦
10 South
San Gabriel
East Los Angeles
El Sereno

CITY OF

ALHAMBRA

CITY OF

MONTEBELLO

CITY OF

ROSEMEAD

CITY OF

LOS ANGELES

CITY OF

SAN GABRIEL

CITY OF

MONTEBELLO

LOS ANGELES
COUNTY
Alhambra Wash
Luguna Channel
Luguna Channel
Garvey Reservoir
Sa
turn S
t
E Rig
gin St
S Wil
cox
Ave
S Orange Ave
Crest Vista
Dr
W Verde Vista Dr
S Bradsha
we Ave
W Elmgate S
t
Bri
gh
twood
St
Jackson Ave
Sheriff Rd
E Grave
s Ave
Del Mar Ave
S Atlantic B
lvd
E 3
rd S
t
S Garfield Ave
S Fremont Ave
W Valley Blvd
Emerson Pl
Hellman Ave
W Floral Dr
E Garvey Av
e
E Emerson Ave
N Montebe
llo B
lvd
W Pomo
na
Blv
d
N New Ave
N G
arfi
eld A
ve
Monterey
Pass Rd
N Findlay Ave
N Wilcox Ave
S New Ave
W Emerson Ave
Corporate Center Dr
Cesar
E C
have
z Ave
N Param
ount Blvd
E Hellman
Ave
S Mednik Ave
W
Newmar
k Ave
N Mednik Ave
N Atlantic Blvd
W
Linc
oln Ave
E Pomona Blvd
S Alhambra AveN Alhambra Ave
Hill Dr
S Almansor St
Findlay Ave
Garvey Ave
Potrero
Gran
de Dr
Potrero Gra
nde D
r
W Garvey Ave
N San Gabriel Blvd
S Atlantic Blvd
W Hellman Ave
N Garfield Ave
E Be
verly B
lvd
S Garfield Ave
W Be
verly Blvd
S Atlantic Blvd
W Rig
gin St
° 0 ½1¼
Mile
October 2019
Sources: City of Monterey Park and MIG, 2019.

Resurrection Cemetery
Land Use Designations
Low Density Residential
Medium Density Residential
High Density Residential
Commercial
Mixed Use
Corporate Center
Innovation/Technology
Public Facilities
Open Space
Housing Overlay I
Housing Overlay II
Note: Also see Regulating Plan

LAND USE POLICY MAP
Base Map Features
Monterey Park Boundary
Sphere of Influence Boundary
Metro Gold Line and Stations
Watercourses and Channels
Garvey Reservoir
Æ2
FIGURE LU-3:

Page 124 of 245 ends

Hellman Ave
San Bernardino Frwy
Emerson Ave Emerson Ave
Garvey Ave
Newmark Ave Newmark Ave
Graves AveGraves Ave
Mooney Dr
Garvey
Reservoir
Moore Ave
McPherrin Ave
Garfield Ave
Rural Dr
New Ave
Lincoln Ave
Alhambra Ave
Orange Ave
Orange Ave
Tegner Rd
Bailey Ave
Floral Dr
Pomona Blvd
Markland Dr
Riggin St
Ferdinand AveGarfield Ave
Heather Dr
Saturn St
Potrero Grande Dr
Pomona Fwy
Fulton Ave
Ackley St
Vista St
Grandridge
Ave Garfield Ave
Kepmton Ave
Chandler Ave
Ramona Ave
Monterey Pass Rd
Ridgecrest St
Hillside St
Brightwood St
Cesar E. Chavez Ave
Floral Dr
Corporate Center Dr
Casuda Canyon Dr
Long Beach Frwy
Garvey Ave
Crest Vista Dr
Atlantic Blvd
El Repetto Dr
Grandridge
Ave
La Merced Rd
Redding Ave
Arroyo Dr
Arland Ave
San Gabriel Blv dDelta St
Del Mar Ave
Hill Dr
Orange St
Potrero Grande Dr
City of
Rosemead
City of
Montebello
Los Angeles County
(East Los Angeles)
City of
Alhambra
710
10 60
Abajo
Dr
Pomona Frwy 60
Monterey Park
General Plan
North
City Boundary
Sphere of Influence Boundary
0 2000 4000 Feet
August, 2000Monterey Park General Plan
Figure C-4
Bicycle Route Plan
Bicycle Route

Page 125 of 245 ends

EXHIBIT B

MITIGATION

MONITORING

PROGRAM

Page 126 of 245 ends

MMIITTIIGGAATTIIOONN

MMOONNIITTOORRIINNGG

PPRROOGGRRAAMM
FFOORR::

MONTEREY PARK

MARKET PLACE

SUPPLEMENTAL EIR

prepared for:

CITY OF MONTEREY
PARK

Contact:

Jim Basham
Development Services
Director

prepared by:

THE PLANNING
CENTER

Contact:

William Halligan, Esq.

Vice President,
Environmental Services

OCTOBER 2011

Page 127 of 245 ends

MMIITTIIGGAATTIIOONN

MMOONNIITTOORRIINNGG

PPRROOGGRRAAMM
FFOORR::

MONTEREY PARK

MARKET PLACE

SUPPLEMENTAL EIR

prepared for:

CITY OF MONTEREY
PARK

320 West Newmark Avenue
Monterey Park, CA 91754-2896
Tel: 626.307.1315
[email protected]

Contact:

Jim Basham
Development Services
Director
prepared by:

THE PLANNING
CENTER|DC&E

3 MacArthur Place, Suite 1100
Santa Ana, CA 92707
Tel: 714.966.9220  Fax: 714.966.9221
E-mail: [email protected]
Website: www.planningcenter.com
Contact:

William Halligan, Esq.

Vice President,
Environmental Services
CMP-02.0E

DECEMBER 2011

Page 128 of 245 ends

Table of Contents

Monterey Park Market Place SEIR Mitigation Monitoring ProgramCity of Monterey Park  Page 1 S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc|Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Section Page

1. INTRODUCTION .............................................................................................................................. 1

1.1 PURPOSE OF MITIGATION MONITORING PROGRAM .................................................. 1

1.2 EIR SUMMARY ................................................................................................................... 1

1.3 PROJECT LOCATION ........................................................................................................ 5

1.4 ENVIRONMENTAL IMPACTS ............................................................................................ 5

2. MITIGATION MONITORING PROCESS ..................................................................................... 910

2.1 MITIGATION MONITORING PROGRAM ORGANIZATION .......................................... 910

2.2 MITIGATION MONITORING PROCEDURES ................................................................ 910

3. MITIGATION MONITORING REQUIREMENTS........................................................................ 1112

3.1 CATEGORIZED MITIGATION MEASURES/MATRIX .................................................. 1112

3.2 LONG-TERM MONITORING ........................................................................................ 1112

4. MITIGATION MONITORING REPORTS ................................................................................... 3726

4.1 FIELD CHECK REPORT .............................................................................................. 3726

4.2 IMPLEMENTATION COMPLIANCE REPORT ............................................................. 3726

4.3 ARBITRATION/ENFORCEMENT REPORT ................................................................. 3726

5. REPORT PREPARATION ......................................................................................................... 3928

5.1 LIST OF PREPARERS ................................................................................................. 3928

Page 129 of 245 ends

Table of Contents

Page 2 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc|Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM List of Tables
Table Page
Table 1-1 Previous Site Plan (2000 MPTP EIR) ......................................................................................... 2 Table 1-2 Proposed Plan for Development .................................................................................................. 3 Table 3-1 Mitigation Monitoring Requirements ..................................................................................... 1314

Page 130 of 245 ends

Monterey Park Market Place SEIR Mitigation Monitoring ProgramCity of Monterey Park  Page 1 S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc|Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM

1. Introduction

1.1 PURPOSE OF MITIGATION MONITORING PROGRAM
This Mitigation Monitoring Program has been developed to provide a vehicle by which to monitor mitigation measures and conditions of approval outlined in the 2000 Monterey Park Towne Plaza (MPTP) EIR, the Supplemental Environmental Impact Report (Draft SEIR), and the Final Supplemental EIR (Final SEIR) (State Clearinghouse No. 1999051058). The Mitigation Monitoring Program has been prepared in conformance with Section 21081.6 of the Public Resources Code and City of Monterey Park Monitoring Requirements. Section 21081.6 states:
(a) When making findings required by paragraph (1) of subdivision (a) of Section 21081 or when adopting a mitigated negative declaration pursuant to paragraph (2) of subdivision (c) of Section 21080, the following requirements shall apply:
(1) The public agency shall adopt a reporting or monitoring program for the changes made to the project or conditions of project approval, adopted in order to mitigate or avoid significant effects on the environment. The reporting or monitoring program shall be designed to ensure compliance during project implementation. For those changes which have been required or incorporated into the project at the request of a responsible agency or a public agency having jurisdiction by law over natural resources affected by the project, that agency shall, if so requested by the lead or responsible agency, prepare and submit a proposed reporting or monitoring program.
(2) The lead agency shall specify the location and custodian of the documents or other material which constitute the record of proceedings upon which its decision is based.

The Mitigation Monitoring Program will serve to document compliance with adopted/certified mitigation measures, which are formulated to minimize impacts associated with the construction and operation of the revised Monterey Park Market Place project (proposed project).

1.2 EIR SUMMARY

1.2.1 Previously Proposed 2000 Monterey Park Towne Plaza Site Plan In March 2000, the Final EIR/EIS for the previous project was certified by the City of Monterey Park Planning Commission. The City had the principal responsibility for project approval and acted as the CEQA lead agency as defined by Section 15367 of the CEQA Guidelines. To help with the costs of land acquisition, site cleanup, and required access, the City received a Section 108 Loan Guarantee and an accompanying Economic Development Initiative grant from the US Department of Housing and Urban Development (HUD).

Because of the assistance provided by HUD, the project was subject to National Environmental Protection Act (NEPA) review, and HUD was the federal (NEPA) lead agency for the previous project .

The
previous site plan required the demolition of all existing buildings, excluding the LTP, and the leveling of the berm along SR-60 on the southern portion of the site. Contaminated berm soil (with traces of lead) would be removed from the site while the remaining soil would be used to level the site. The previously proposed

Page 131 of 245 ends

1. Introduction

Page 2 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc|Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM development is similar in type, the proposed development. Approximately 464,143 square feet of the 515,382 square feet were proposed as retail space (including two anchor stores with garden centers). Another 36,250 square feet were proposed for retail or restaurant pads, and 14,989 square feet were proposed for restaurant space. The previously proposed development would have included 2,971 parking spaces. Table 1-1 shows the previous plan for development.

Table 1-1
Previous Site Plan (2000 MPTP EIR)
Building and Use Square Footage
Retail “A”
Garden Center
107,920
23,928
Retail “B” (includes Garden Center) 135,300
Retail “C” 45,000
Retail “D” 37,275
Retail “E” 41,265
Retail “F” 35,000
Retail “G” 11,100
Retail “H” 12,350
Retail “I” 11,168
Retail “J” 3,837
Pad 1 11,250
Pad 2 25,000
Restaurant 1 3,035
Restaurant 2 2,954
Restaurant 3 9,000
Total 515,382

1.2.2 Proposed Land Uses
The proposed project, the Monterey Park Market Place, revises the previous site plan for the Monterey Park Towne Plaza by increasing the total retail square footage from 515,382 to 600,000. The project site covers a total area of 51.1 acres, 42.1 of which are part of the closed OII Landfill and approximately 9 of which are within existing Southern California Edison (SCE) easements. The proposed project would have similar retail uses, including drive-thru and sit-down restaurants, large anchor retail stores with garden centers, and smaller specialty retail shops. The gas station, as shown as Pad 5 in Table 1-2, is not proposed at this time but may be a future use. Implementation of the gas station at a future time would require permitting by SCAQMD. Table 1-2 summarizes the proposed land uses and the parking demand factor for each type of land use. The proposed land uses require a minimum of 2,333 parking spaces, which would be provided onsite.

Page 132 of 245 ends

1. Introduction

Monterey Park Market Place SEIR Mitigation Monitoring ProgramCity of Monterey Park  Page 3 S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc|Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Table 1-2
Proposed Plan for Development
Building Type
Gross
Building Area
(sf) Building Usage
Parking
Demand
(per 1,000 sf)1
Parking Spaces
Required
Buildout by Individual Building
Retail “A” – Anchor 1 128,000 Home Improvement 3.40 520 Garden Center 25,000 Garden Center NA Retail “B” – Anchor 2 99,011 Retail/Department Store 3.02 299 Retail “C” – Anchor 3 134,000 Retail/Department Store 3.02 441 Garden Center 12,000 Garden Center NA Retail “D” – Anchor 4 138,000 Wholesale/Discount Store 2.75 380 Optional Retail (Fitness
Center)2 25,000 Fitness Center 5.19 130
Retail “E” 9,248 Mixed Retail/Restaurant 16.30 171
Retail “G” 10,516 Mixed Retail/Restaurant 16.30 151
Pad 1 3,225 Bank 3.49 11
Pad 2 5,000 Fast Food Restaurant 9.90 50
Pad 3 6,000 Restaurant 16.30 98
Pad 4 5,000 Restaurant 16.30 82
Pad 55 NA Gas Station NA NA
Total 600,000 NA NA 2,333
Buildout by Building Type
Total Anchor (including garden centers)2 561,011 sf
Total Retail (nonanchor)3 3,225–22,989 sf
Total Restaurant4 16,000–35,764 sf
Gas Station5 NA sf
Source: Monterey Park Retail Partners, LLC, 2009.
1 The parking demand is based on the highest possible parking demand for the proposed project site. 2 The 25,000-square-foot fitness center and the 12,000-square-foot garden center are not shown on the site plan but are included in the total square footage to provide a more conservative parking estimate. If the fitness center option is chosen, it would be built as part of Building D. The second garden center would be built with Building C. The total parking demand is based on the buildout of a fitness center and the 12,000-square-foot garden center in addition to the buildout of Building D and Building C.
3 This range of totals includes Mixed Retail/Restaurant and Bank. If Retail E and G are developed entirely as mixed retail, total retail (nonanchor) square footage would be 22,989. If Retail E and G are developed entirely as restaurants, total retail (nonanchor) square footage would be 3,225. 4 This range of totals includes Mixed Retail/Restaurant, Fast Food Restaurant, and Restaurant uses. If Retail E and G are developed entirely as restaurants, the total restaurant square footage would be 35,764. If Retail E and G are entirely developed as mixed retail, the total restaurant square footage would be 16,000.
5 The gas station is not proposed at this time but may be a future use. Implementation of the gas station at a future time would require permitting by SCAQMD.

Based on the type of commercial business and the various buildout options, anchor stores, including the garden centers, would make up a maximum of 561,011 square feet, nonanchor retail would make up 3,225 to 22,989 square feet, and restaurants would make up 16,000 to 35,764 square feet of the total gross building area.

Although not included with the proposed project, a leachate treatment plant (LTP) and thermal destruction facility (TDF) will continue to operate on the project site. Leachate is a common product of landfills, made of groundwater and the compounds of decomposing material in the landfill. The LTP collects leachate from the south parcel of the OII landfill and treats it. Off-gas is produced during leachate treatment and must be burned in the treatment plant. The LTP directs off-gas to the South Parcel via a 12-inch pipeline, where it is burned along with gas produced in the South Parcel. The TDF structure has two 60-foot high stacks, each approximately 6 feet in diameter. It was constructed after the certification of the 2000 MPTP EIR and improves the leachate treatment process. The structure would be contained by a chain-link fence and public access would be restricted.

Page 133 of 245 ends

1. Introduction

Page 4 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc|Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Monterey Park Market Place Precise Plan
The proposed project includes the Monterey Park Market Place (MPMP) Precise Plan, which is a required document for development within the Regional-Specialty Center (R-S) Planned Development Overlay Zone to ensure consistency with the Monterey Park General Plan. The purpose of having a precise plan is to describe how the proposed project would meet the requirements of the Planned Development Overlay Zone on the project site; provide the overall design concept for the site; implement the goals, policies, and objectives of the City’s general plan as feasible; and establish the development regulations and framework for the project site.

Detailed building and site development standards and regulations are included in the precise plan, such as architectural themes, building height, and types of permitted businesses. Maximum height of buildings is set in the MPMP Precise Plan and meets the standards of the R-S Planned Development Zone Overlay, which is 50 feet or 4 stories. Architectural features are allowed to project an additional 15 feet above maximum building height with the approval of a conditional use permit. The proposed buildings would be between 30 and 50 feet in height (up to 60 feet with architectural features).

Project Access and Parking
The existing access road for the proposed project site is Greenwood Avenue, which enters the northern boundary of the project site from Potrero Grande Drive. The main road through the development would be named Market Place Drive. This road would be slightly realigned where it enters the project site on the north and then extended toward the east corner of the site. Neil Armstrong Street would no longer intersect Paramount Avenue but would intersect Market Place Drive instead. Market Place Drive would intersect Paramount Avenue east of the project site. With the completion of all roadway improvements, the site would be accessible from both Potrero Grande Drive and Paramount Boulevard off of SR- 60.

Market Place Drive would serve as the main public/private roadway through the retail center and it would allow truck and standard vehicle access. Additional specified truck/service routes would allow access to the buildings to allow for pick-up and delivery of goods. The circulation plan for the project site will identify the primary vehicle, truck/service, and pedestrian access routes on the project site.

Onsite parking is provided based on the parking demand ratio of the proposed land uses per 1,000 square feet of building space, as shown in the far right column in Table 1. A minimum of 2,333 spaces would be provided, including 44 handicapped spaces throughout the site, placed near the entrances for anchor stores, the smaller mixed retail/restaurant stores, and the retail/restaurant pads. Although 2,333 are required, up to 2,386 would be provided, which would result in a surplus of up to 53 parking spaces. All parking lots are aboveground surface lots and would be accessible from Market Place Drive.

Alternate Land Use Scenario: Small-Box Development
An alternative layout to the revised project is also provided for the project site in the event that the project applicant opts to develop a small-box retail shopping center instead of the big-box retail. The small-box alternative would have a reduced total square footage of 500,000 square feet that would include 3 anchors, up to 10 smaller retail stores, and 7 retail pads. The retail anchor stores would line the northern boundary of the project site and retail anchor “E” (110,000 square feet) would have a garden center (30,000 square feet).

The largest anchor, Retail A (140,000 square feet), would be north of the northern Greenwood Avenue (Market Place Drive) entrance. South of Retail A, across Market Place Drive, are Retail stores G through M.

Retail F, which is adjacent to the LTP/TDF, Retail Pad 6, and Retail Pad 7 are all more centrally located on the site and Retail B and C and Retail Pads 1 through 5 share the northern boundary of the site with the anchor stores. Anchor stores would have a total square footage of 321,000, and retail nonanchor stores would have a total square footage between 139,000 and 150,000, depending on whether Retail F is

Page 134 of 245 ends

1. Introduction

Monterey Park Market Place SEIR Mitigation Monitoring ProgramCity of Monterey Park  Page 5 S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc|Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM developed as retail or restaurant. Restaurants would have a total square footage of between 29,000 and 40,000.

The alternate small-box site plan scenario has the same or similar impacts as the revised project. The general site layout, construction phasing, and public and service demands would be similar between the revised project and the alternate scenario. However, additional traffic analysis was completed for a larger alternate scenario, which is discussed in Section 5.5 of the Draft SEIR and included in the Traffic Impact Assessment (Appendix E1 of the Draft SEIR). In the event that minor adjustments are made to the location and size of buildings in the small-box site plan scenario, the changes must not increase the project-related impacts associated with the small-box site plan scenario. If impact levels are increased, additional environmental analysis would be required. The City would be responsible for ensuring the modifications do not require additional environmental review.

1.3 PROJECT LOCATION
The proposed Monterey Park Market Place is in the southern portion of the City of Monterey Park and borders the City of Montebello. It would be at 2550 Greenwood Avenue, north of SR-60 between the Paramount Boulevard and Potrero Grande Drive freeway exits. The project site is bounded by Southern California Edison (SCE) easements on the northwest and northeast. Beyond the SCE easements are Potrero Grande Drive to the northwest and the Resurrection Cemetery and residential land uses to the northeast and east. Greenwood Avenue accesses the site from the north from Potrero Grande Drive; Neil Armstrong Street intersects Paramount Boulevard to the east of the site.

1.4 ENVIRONMENTAL IMPACTS
This document has been prepared as a supplement to a previous Environmental Impact Report as defined by the State CEQA Guidelines (Section 15163, California Code of Regulations, Title 14, Division 6, Chapter 3).

Specifically, a supplement to the certified EIR has been prepared for the 2000 Monterey Park Towne Plaza (SCH No. 1999051058) . The Draft SEIR has an overall purpose to inform the lead agency, responsible agencies, decision makers, and the general public of the environmental effects of the development and operation of the revised project. The Draft SEIR addressed the potential environmental effects of the revised project, including effects that might be significant and adverse; disclosed effects not found to be significant; disclosed significant cumulative impacts of all past, present, and reasonably foreseeable future projects; evaluated a number of alternatives to the revised project; and identified mitigation measures to reduce or avoid adverse effects.

1.4.1 Impacts Considered Less Than Significant
As outlined in the Initial Study, prepared on June 16, 2010, the following categories were sufficiently analyzed in the 2000 Monterey Park Towne Plaza EIR and found to be less than significant:
 Agriculture and Forest Resources
 Biological Resources
 Cultural Resources
 Geology and Soils
 Hazards and Hazardous Materials
 Hydrology and Water Quality
 Land Use and Planning
 Mineral Resources
 Population and Housing
 Public Services
 Recreation

Page 135 of 245 ends

1. Introduction

Page 6 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc|Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM

1.4.2 Potentially Significant Adverse Impacts That Can Be Mitigated, Avoided, or Substantially Lessened
With project design features and mitigation measures incorporated, the following environmental categories had less than significant impacts:
 Aesthetics
 Noise
 Utilities and Service Systems

1.4.3 Unavoidable Significant Adverse Impacts
With mitigation measures, air quality, greenhouse gas emissions, and transportation and traffic would have significant and unavoidable impacts
Air Quality
Impact 5.2-2
Construction emissions exceed SCAQMD’s regional significance thresholds for NOx and would cumulatively contribute to the SoCAB’s nonattainment designations. Grading emissions would be roughly the same between the 2000 MPTP EIR and the revised MPMP Precise Plan . However, the 2000 MPTP EIR did not identify significant construction emissions because construction activities were compared to screening thresholds and were not modeled. SCAQMD now requires comparison to daily emissions thresholds and new air pollutant models (e.g., URBEMIS) have been released to evaluate construction emissions. Modeling results now show that even with implementation of Mitigation Measures 2-1 and 2-7, impacts from regional air pollutant emissions from construction-related activities would exceed SCAQMD’s regional significance thresholds for NOX as a result of use of heavy construction equipment. Mitigation Measure 2-7 would reduce potentially significant impacts during Phase 1 construction activities to under the significance thresholds; however, construction activities during Phase 2 site preparation would continue to exceed SCAQMD’s regional significance thresholds for NO X. Therefore, impacts are significant and unavoidable. Regional construction emissions impacts are a new significant unavoidable impact not identified in the 2000 MPTP EIR.

Impact 5.2-3
Operational phase emissions exceed SCAQMD’s regional significance thresholds for VOC, NOX, CO, PM10, and PM2.5 and would cumulatively contribute to the SoCAB’s nonattainment designations. The MPMP Precise Plan would exceed the thresholds for VOC, CO, NOX, PM10, and PM2.5. Mitigation Measures 2-8 through 2-17 would reduce operational emissions, to the extent feasible. Criteria air pollutant emissions that exceed SCAQMD’s regional significance thresholds would cumulatively contribute to the NO 2, O3, and particulate matter nonattainment designations of the SoCAB. While air quality impacts were identified in the 2000 MPTP EIR, the MPMP Precise Plan would result in an approximately 5 to 8 percent increase in air quality impacts for most criteria pollutants on weekdays and an approximately 44 percent increase in air quality impacts for most criteria pollutants on weekends, compared to the 2000 MPTP. However, the project would result in a decrease in air quality impacts based on emissions as identified in the 2000 MPTP EIR for CO (weekday only), VOC, and NOx because of updated emission rates used in this SEIR that reflect lower emission rates for vehicles. Further, based on the updated emission factors in the UREMIS2007 model, the revised SEIR analysis has identified additional significant impacts associated with PM10 and PM2.5 that were not identified in the EIR. The increase in air pollutant emissions would exceed the SCAQMD regional thresholds and therefore the magnitude of change is considered to be significant. Modeling based on updated air pollutant emission factors in the URBEMIS2007 model show that VOC, CO, NOX, PM10, and PM2.5 would exceed the significance thresholds for the MPMP Precise Plan. Since emissions of particulate matter (PM 10 and PM 2.5) were not

Page 136 of 245 ends

1. Introduction

Monterey Park Market Place SEIR Mitigation Monitoring ProgramCity of Monterey Park  Page 7 S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc|Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM identified in the 2000 MPTP, this is considered a new significant impact . Consequently, impacts from air pollutant emissions from operational-related activities would be significant and unavoidable.

Greenhouse Gas Emissions
Impact 5.3-1
Project-related GHG emissions are cumulatively considerable . The MPMP Precise Plan would generate 36,509 metric tons of GHG emissions. While all feasible mitigation measures have been incorporated into the project, the total increase in GHG emissions onsite from the project would still be substantial. The 2000 MPTP EIR did not identify significant impacts related to GHG emissions because GHG emissions were not incorporated into the CEQA Guidelines until March 18, 2010. GHG emissions are higher for the MPMP Precise Plan as a result of a 17 percent increase in building square footage (600,000 square feet compared to 515,382 square feet) and 6 percent increase in average daily vehicle trips (19,719 compared to 18,674) .

Since GHG emissions were not identified before, this is considered a new significant impac t.

Tr
ansportation and Traffic
Impact 5.5-1
Opening Year 2015
Inasmuch as the primary responsibility for approving and/or completing certain improvements located outside the City of Monterey Park lies with agencies other than the City of Monterey Park (i.e., City of Montebello and Caltrans), there is the potential that significant impacts may not be fully mitigated if such improvements are not completed for reasons beyond the City of Monterey Park’s control (e.g., the City of Monterey Park cannot undertake or require improvements outside of Monterey Park’s jurisdiction or the City cannot construct improvements in the Caltrans right-of-way without Caltrans approval). Should that occur, the project’s traffic impact would remain significant.

Impacts that would remain significant and unavoidable from the 2000 MPTP EIR:
 Garfield Avenue/Pomona Boulevard (weekday PM peak)
 Garfield Avenue/Via Campo (weekday PM peak)
 Markland Drive–Vail Drive/Via Campo (weekday PM peak) New significant and unavoidable impacts associated with the MPMP Precise Plan:
 Wilcox Avenue/Via Campo (weekday PM peak)
 Paramount Boulevard/SR- 60 westbound ramps–Market Place Drive (weekday AM peak/weekend midday peak)
 Paramount Boulevard/SR-60 eastbound ramps–Town Center Drive (weekend midday peak)  Paramount Boulevard/Montebello Boulevard (weekday PM peak)  Montebello Boulevard/Beverly Boulevard (weekday PM peak)  Markland Drive/Potrero Grande Drive
 Saturn Street–Greenwood Avenue/Potrero Grande Drive
In addition to the impacts identified above associated with the MPMP Precise Plan, the following additional significant impacts are associated with the small-box alternate scenario:
 Markland Drive/Vail Avenue/Via Campo (weekday AM peak)

Page 137 of 245 ends

1. Introduction

Page 8 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc|Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Buildout Year 2025
Inasmuch as the primary responsibility for approving and/or completing certain improvements located outside the City of Monterey Park lies with agencies other than the City of Monterey Park (i.e., City of Montebello and Caltrans), there is the potential that significant impacts may not be fully mitigated if such improvements are not completed for reasons beyond the City of Monterey Park’s control (e.g., the City of Monterey Park cannot undertake or require improvements outside of Monterey Park’s jurisdiction or the City cannot construct improvements in the Caltrans right-of-way without Caltrans approval). Should that occur, the project’s traffic impact would remain significant.

Impacts that would remain significant and unavoidable from the 2000 MPTP EIR:
 Wilcox Avenue/Pomona Boulevard (weekday PM peak)
 San Gabriel Boulevard–Paramount Boulevard/Hill Drive (weekday PM peak) The following intersections would be new significant and unavoidable traffic impacts associated with the MPMP Precise Plan:
 Garfield Avenue/Pomona Boulevard (weekday AM and PM peak)  Garfield Avenue/Via Campo (weekday PM peak hour)
 Markland Drive–Vail Avenue/Via Campo (weekday PM peak)  Paramount Boulevard/SR-60 westbound ramps–Market Place Drive (weekday AM and PM peak/weekend midday peak)
 Paramount Boulevard/SR-60 eastbound ramps (weekday PM peak/weekend midday peak)  Paramount Boulevard/Montebello Boulevard (weekday AM and PM peak)  Montebello Boulevard/Beverly Boulevard(weekday PM peak) The following intersection would be a new and significant and unavoidable traffic impact from the MPMP Precise Plan. Mitigation for impacts to this intersection was determined to be infeasible due to right-of-way constraints.
 Wilcox Avenue/Via Campo (weekday AM and PM peak)
In addition to the impacts identified above associated with the MPMP Precise Plan, the following additional significant impacts are associated with the small-box alternate scenario:
 Paramount Boulevard/SR-60 eastbound ramps (weekday AM peak/weekend midday peak) However, the small-box alternate scenario would have less than significant impacts at the following intersections:
 Markland Drive–Vail Avenue/Via Campo (weekday PM peak)  Paramount Boulevard/SR-60 eastbound ramps (weekday PM peak/weekend midday peak)

Page 138 of 245 ends

Monterey Park Market Place SEIR Mitigation Monitoring ProgramCity of Monterey Park  Page 9 S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc|Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM

2. Mitigation Monitoring Process

2.1 MITIGATION MONITORING PROGRAM ORGANIZATION
CEQA requires that a reporting or monitoring program be adopted for the conditions of project approval that are necessary to mitigate or avoid significant effects on the environment (Public Resources Code 21081.6).

The mitigation monitoring and reporting program is designed to ensure compliance with adopted mitigation measures during project implementation. For each mitigation measure recommended in the Environmental Impact Report, specifications are made herein that identify the action required and the monitoring that must occur. In addition, a responsible agency is identified for verifying compliance with individual conditions of approval contained in the Mitigation Monitoring Program (MMP). In order to effectively track and document the status of mitigation measures, a mitigation matrix has been prepared and includes:
 Responsibility for implementation
 Timing
 Responsibility for monitoring
 Monitor
Mitigation measure timing of verification has been apportioned into several specific timing increments. Of these, the most common are:
 Prior to project approval
 Prior to issuance of grading permit(s)
 During construction
Information pertaining to compliance with mitigation measures or any necessary modifications or refinements will be documented in the comments portion of the matrix.

Supplement to the Certified 2000 EIR Mitigation Monitoring Program Since this is a supplemental EIR, the MMP for this project modifies the previously adopted MMP for the Monterey Park Towne Plaza (March 2000). The MMP for the SEIR includes the revised and new mitigation measures for the proposed project. Where appropriate, the timing and responsible agency information from the 2000 MMP has been retained.

2.2 MITIGATION MONITORING PROCEDURES
The City of Monterey Park Development Services Department is the designated lead agency for the Mitigation Monitoring and Reporting Program. The City of Monterey Park includes the Mitigation Measures within the Special Conditions of Approval. The City is responsible for review of all monitoring reports, enforcement actions, and document disposition. The Community Development Department shall designate a Project Mitigation Monitor for the proposed project.

Page 139 of 245 ends

2. Mitigation Monitoring Process

Page 10 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc|Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM

2.2.1 In-Field Monitoring
The Responsible Monitoring Party shall exercise caution and professional practices at all times when monitoring construction. Protective wear (hard hats, glasses, etc.) shall be worn at all times in construction areas. Injuries shall be reported immediately to the Project Mitigation Monitor.

2.2.2 Coordination with Contractors
The construction manager/superintendent is responsible for coordination of contractors and for contractor completion of required measures in accordance with the provisions of this program.

2.2.3 Recognized Experts
The use of recognized experts as a component of the monitoring team is required to ensure compliance with scientific and engineering mitigation measures. While the recognized experts assess compliance with required mitigation measures, consultation with the City of Monterey Park planning staff shall take place in the event of a dispute.

2.2.4 Enforcement
Agencies may enforce conditions of approval through their existing police power, using stop-work orders, fines, infraction citations, loss of entitlements, refusal to issue building permits or certificates of use and occupancy or, in some cases, notice of violation for tax purposes. Criminal misdemeanor sanctions could be available where the agency has adopted an ordinance requiring compliance with the monitoring program, similar to the provision in many zoning ordinances that affirm the enforcement power to bring suit against violators of the ordinances.

Page 140 of 245 ends

Monterey Park Market Place SEIR Mitigation Monitoring ProgramCity of Monterey Park  Page 11 S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc|Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM

3. Mitigation Monitoring Requirements

3.1 CATEGORIZED MITIGATION MEASURES/MATRIX
Project-specific mitigation measures and project design features (PDFs) have been categorized in matrix format, as shown in Table 3-1. The matrix identifies the environmental factor, specific mitigation measures, schedule, and responsible monitor. The mitigation matrix will serve as the basis for scheduling the implementation of, and compliance with, all mitigation measures.

A supplemental EIR only discusses new environmental impacts that would result from a change in the project description between the original and revised projects and it only needs to contain the information necessary to make the previous EIR adequate for the project as revised (CEQA Guidelines Section 15163). To avoid certain environmental impacts, the City of Monterey Park has included certain PDFs, which are considered part of the proposed project. The PDFs are mandatory and will be adopted by the City of Monterey Park as part of the project’s conditions of approval. Both the PDFs and mitigation measures are part of the MMP to be implemented by the City of Monterey Park. To provide a complete matrix that may be used for monitoring and enforcement, this mitigation monitoring program includes mitigation measures and project design features associated with the new impacts caused by the proposed project, as well as all mitigation measures which remain effective from the previously certified 2000 MPTP EIR.

3.2 LONG-TERM MONITORING
Long-term monitoring related to several mitigation measures will be required, including fire safety inspections.

Postconstruction fire inspections are conducted on a routine basis by the City of Monterey Park Fire Department.

Page 141 of 245 ends

3. Mitigation Monitoring Requirements

Page 12 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc|Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM This page intentionally left blank.

Page 142 of 245 ends

3. Mitigation Monitoring Requirements

Monterey Park Market Place SEIR Mitigation Monitoring Program The Planning Center|DC&E

Page 13 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc| Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Table 3-1
Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)

5.1 AESTHETICS
PDF 1-1 Signs shall accentuate the architecture of the project and contribute to a lively and visually stimulating experience.

Project applicant Prior to approval of first
certificate of occupancy
Community Development
Department

PDF 1-2 Wayfinding signage shall be located to orient pedestrians to the project site and local transit options and its surroundings. The appearance of directory signs should contribute to the identity of the project.

Project applicant Prior to approval of first
certificate of occupancy
Community Development
Department

PDF 1-3 The location, size and appearance of tenant identification and storefront signs shall lend support to retail activity, complementing the architecture of the building and overall character of the project.

Project applicant Prior to approval of first
certificate of occupancy
Community Development
Department

PDF 1-4 Off-site signs and LED signs shall not be oriented towards residential areas.

Project applicant Prior to approval of first
certificate of occupancy
Community Development
Department

PDF 1-5 Lighting fixtures including lighted signs shall be state-of-the-art and energy-efficient, shall be focused down on buildings and in parking lot areas, and light spill beyond parking lots or roadways on the perimeter of the site shall not be greater than 0.5 footcandles. Light sources shall be shielded and focused to reduce visibility from residential areas and the adjacent freeway.

Project applicant Prior to the issuance of a
building permit
Public Works Department
PDF 1-6 To minimize the impact of lighted parking areas, the lighting system shall be designed with full cut-off designs (downcast) and should be equipped with the ability to control light fixtures for individual areas at different lighting levels, such as from active operation to security mode.

Project applicant Prior to the issuance of a
building permit
Public Works Department
PDF 1-7 Prior to the approval of improvement plans for the surface parking areas, the project applicant shall submit a parking and sign lighting plan for review and approval by the Department of Public Works. The lighting plan shall include the amount, location, height, and intensity of sign and parking-area lighting, designed in a manner to reduce potential for light and glare and incidental spillover into adjacent residential properties to the maximum extent feasible, while maintaining public safety and adequate lighting to ensure sign visibility.

Project applicant Prior to the issuance of a
building permit
Public Works Department
PDF 1-8 Rooftop equipment (e.g. HVAC units, vents, etc.) should be enclosed in architecturally treated parapets that extend at least 12 inches Project applicant Prior to the issuance of a
building permit
Community Development
Department

Page 143 of 245 ends

3. Mitigation Monitoring Requirements

Monterey Park Market Place SEIR Mitigation Monitoring Program The Planning Center|DC&E

Page 14 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc| Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Table 3-1
Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
above the tallest piece of equipment.

5.2 AIR QUALITY
PDF 2-1 The landscape concept for the project is urban in nature and has elements associated both with the “Prairie Style” design and Southern California décor. Landscape selections shall be made to accentuate the design style, but issues such as long-term life span of the trees, drought tolerance, colors, and maintenance requirements shall also be incorporated into the overall design. Landscape plans are subject to the approval of the Planning Division and Design Review process.

1. Plant Materials – All plant materials shall be drawn from the list of suitable plant materials provided in the following table and as stipulated in the Conditions of Approval. Exceptions for the use of other plant materials shall be allowed. Interior trees shall have minimum height of approximately 8-feet during installation, measured to the top of the branches from ground service at tree trunk, with maximum growth height of approximately 30-feet. Exterior trees located along the entryways of the Market Place shall have minimum height of approximately 10-feet installation, and a maximum growth height of approximately 50-feet. SCE has a 15-foot height limit for any plant material under the overhead power lines.

2. Planting Design – Landscaping would be provided along project roadways to accent the entrance and create a framework for the entry that would follow through the entire project site. Various trees would be planted for aesthetic value, as well for shade in the parking areas.

Additional landscaping would be placed near proposed buildings to accentuate its architecture style. Landscaping and irrigation plans signed by a landscape architect and/or landscape contractor shall be submitted, subject to the review and approval of the Planning Division of the City. The design patterns of the project’s landscaping will provide both formal and informal groupings of deciduous and evergreen shade trees, flowering shrubbery, and ground cover. The following measures incorporate the landscape design character and visual qualities for development with the project.

Project applicant Prior to the issuance of a
building permit
Community Development
Department

Page 144 of 245 ends

3. Mitigation Monitoring Requirements

Monterey Park Market Place SEIR Mitigation Monitoring Program The Planning Center|DC&E

Page 15 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc| Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Table 3-1
Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
a. Landscaping in the interior of the parking area shall be required equal to at least ten percent (10%) of the total area of the parking area. A minimum of three-foot-wide landscaped planter and/or grass area shall be located adjacent to all rights-of-way, and continuously maintained.

b. Landscape plans shall include plans for the Landfill Cap area, where no water percolation is permitted. Raised planters and pots shall be used to introduce trees, shrubs and floral materials in this area. Raised planters shall be designed to drain into the storm water drainage system.

c. The plans shall show the location of turf, trees, shrubs, walks, fences, and any ponds, fountains or other decorative landscaping features:

i. Indicate soils preparation where necessary;

ii. Provide a typical planting detail for trees and shrubs;

iii. List the botanical and common names of all plants with the quantity of each and their container size;

iv. Clearly portray the location, coverage and specifications of the permanent automatic irrigation system.

d. Landscaping and irrigation systems shown on approved plans shall be installed as required by the Planning Division.

e. An automatic irrigation system shall be installed in all landscaped areas to insure proper maintenance year round. The developer will provide all irrigation systems. These will be segregated into metering zones with individual meters and timers that will provide appropriate irrigation for landscaping throughout the site. These systems will also have rain and moisture detectors in order to prevent over irrigation. All

Page 145 of 245 ends

3. Mitigation Monitoring Requirements

Monterey Park Market Place SEIR Mitigation Monitoring Program The Planning Center|DC&E

Page 16 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc| Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Table 3-1
Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
systems will be standard in design with typical pop-up heads and flexible raisers.

PDF 2-2 For proper waste management practices, trash enclosures and/or equipment will be strategically located in the rear of each building as feasible. Solid steel gates shall be utilized as well. Most major tenants will have their own waste management areas within their building footprints in order to maintain the proper visual aesthetics of the center. Public waste management will be accomplished by placing on-site furniture, such as waste receptacles and ash urns, throughout the center. To minimize solid waste generated by the project, the following measures are to be implemented:

1. Construction Phase – During project construction, the following practices should be implemented by the project applicant:

a. Off-site locations for construction waste exported from the project and options for disposal of excess material should be identified.

These options may include recycling of materials on-site, sale to a broker or contractor, sale to a project in the vicinity, or transport to an environmentally-cleared landfill.

b. The project applicant should offer recyclable building materials, such as asphalt or concrete for sale or removal by private firms or public agencies for use in construction of other projects if all cannot be reused on the project site.

2. Operation Phase – During project operations, the following practices should be implemented by the project tenants within their buildings and will be specified in lease agreements with the project applicant:

a. Recovery of materials such as aluminum and cardboard;

b. Collection of office paper for recycling;

Project applicant

Project
applicant/construction
contractor

Project applicant/tenants
Prior to approval of first
certificate of occupancy

During construction

During operation
Community Development
Department

Public Works Department

Public Works Department

Page 146 of 245 ends

3. Mitigation Monitoring Requirements

Monterey Park Market Place SEIR Mitigation Monitoring Program The Planning Center|DC&E

Page 17 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc| Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Table 3-1
Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
c. Collection of polystyrene (foam) cups for recycling;

d. Collection of glass, plastics, kitchen grease, laser printer toner cartridges, oil, batteries, and scrap metal for recycling or recovery.

3. Design Features – The project applicant, tenants, and/or property owner are strongly encouraged but not required, to implement design features to support solid waste reduction programs, suggestions include:

a. Detailing the location and design of on-site recycling facilities;

b. Providing on-site recycling receptacles to encourage recycling;

c. Facilitating cardboard recycling (especially in retail areas) by providing adequate space and centralized locations for collection and bailing;

d. Providing trash compactors for non-recycling materials to reduce the total volume of solid waste and the number of trips required for collection;

e. Providing on-site recycling receptacles in feasible locations accessible to the public to encourage recycling of all business, employees, and patrons.

PDF 2-3 Reduction of trip and travel demand measures are provided in accordance with State Government Code Sections 65089 and 65089.3 (Ord. 1852 § 3(2), 1993). Prior to approval of any development project, the project applicant shall make provision for all of the following applicable transportation demand management and trip reduction measures to promote better air quality. Development Standards for Nonresidential Development of one hundred thousand square feet or more shall comply with this section, and shall additionally provide all of the following measures to the satisfaction of the Planning and Engineering Divisions.

Project applicant Prior to approval of first
certificate of occupancy

Community Development
Department

Page 147 of 245 ends

3. Mitigation Monitoring Requirements

Monterey Park Market Place SEIR Mitigation Monitoring Program The Planning Center|DC&E

Page 18 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc| Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Table 3-1
Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)

1. Displayed Information – A bulletin board, display case, or kiosk displaying transportation information located where the greatest number of employees are likely to see it. Information shall include, but is not limited to, the following:

a. Current maps, routes and schedules for public transit routers serving the site;

b. Telephone numbers for referrals on transportation information, including numbers for regional ridesharing agency and local transit operators;

c. Ridesharing promotional materials supplied by commuter-oriented organizations;

d. Bicycle route and facility information, including regional/local bicycle maps and bicycle information;

e. A listing of facilities available for car-poolers, vanpoolers, bicyclists, transit riders and pedestrians at the site.

2. Vanpool – Not less than 10 percent of employee parking area shall be located as close as practical to the employee entrance(s), and shall be reserved for use by potential carpool/vanpool vehicles, without displacing handicapped and customer parking needs. A statement that preferential carpool/vanpool spaces for employees are available and a description of the method for obtaining such spaces must be included on the required transportation information board.

This occurs primarily at the rear of the major retail tenants.

a. Spaces will be signed/striped as demand warrants;

b. At all times at least one space for projects of fifty thousand square feet to one hundred thousand square feet shall be provided;

Page 148 of 245 ends

3. Mitigation Monitoring Requirements

Monterey Park Market Place SEIR Mitigation Monitoring Program The Planning Center|DC&E

Page 19 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc| Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Table 3-1
Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
c. Two (2) spaces for projects over one hundred thousand square feet will be signed/striped for carpool/vanpool vehicles;

d. Adequate turning radii and parking space dimensions shall also be included in van pool parking areas.

3. Bicycles – Bicycle racks or other secure bicycle parking shall be provided to accommodate four bicycles per the first fifty thousand square feet of nonresidential development;

a. Bicycle racks shall accommodate one additional bicycle per each additional fifty thousand square feet of nonresidential development.

Calculations which result in a fraction of 0.5 or higher shall be rounded up to the nearest whole number.

b. A bicycle parking facility may also be fully enclosed space or locker accessible only to the owner or operator of the bicycle, which protects the bike from inclement weather;

c. Specific facilities and location (e.g. provision of racks, lockers, or locked room) shall be to the satisfaction of the Director of Community Development.

4. Safety – A safe and convenient zone in which vanpool and carpool vehicles may deliver or board their passenger.

5. Sidewalks – Sidewalks or other designated pathways following direct and safe routes from the external pedestrian circulation system to each building in the development;

6. Bus Stop – The City will consult with the local bus service providers in determining appropriate improvements. When locating bus stops and/or planning building entrances, entrances must be designed to provide safe efficient access to nearby transit stations/stops.

Page 149 of 245 ends

3. Mitigation Monitoring Requirements

Monterey Park Market Place SEIR Mitigation Monitoring Program The Planning Center|DC&E

Page 20 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc| Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Table 3-1
Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)

7. Circulation – Safe and convenient access from the external circulation system to bicycle parking facilities on site.

8. Employee parking – Employee parking shall be adequately provided within the total number of parking spaces planned for this center. This primarily is located to the rear of the major retail tenants.

During peak shopping periods, off-site parking for employees may be installed.

MM 2-1 The construction contractor shall water a minimum of three times daily for dust control (preferably using reclaimed water) during ground-disturbing activities.

Construction contractor During construction (ground-
disturbing activities)
Construction
contractor/Public Works
Department

MM 2-2 The construction contractor shall operate PM10-efficient street sweepers or roadway washing trucks on adjacent roadways to remove dirt dropped by construction vehicles or dried mud carried off by trucks moving or bringing construction materials at least once a day during ground disturbing activities.

Construction contractor During construction Construction contractor/Public Works
Department

MM 2-3 The construction contractor shall cover trucks or wet down loads of any dirt hauled to or from the project site. A minimum of 24 inches of freeboard shall be maintained on any soil haul truck.

Construction contractor During construction Construction contractor/Public Works
Department

MM 2-4 The construction contractor shall perform low-NOx emissions tune-ups on onsite equipment operating onsite for more than 60 days.

Construction contractor During construction Construction contractor/Public Works
Department

MM 2-5 The construction contractor shall utilize electrical line power instead of portable construction equipment, where feasible.

Construction contractor During construction Construction contractor/Public Works
Department

MM 2-6 The construction contractor shall implement a congestion relief program. The congestion relief program shall require the construction contractor to implement the following:

1. Rideshare incentives, such as bus passes, shall be provided for construction personnel by Operating Industries Incorporated or the Construction Contractor.

2. Off-street parking for construction contractors and employees shall be provided.

Construction contractor During construction Construction contractor/Public Works
Department

Page 150 of 245 ends

3. Mitigation Monitoring Requirements

Monterey Park Market Place SEIR Mitigation Monitoring Program The Planning Center|DC&E

Page 21 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc| Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Table 3-1
Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)

3. Lane closures shall be limited to non-peak traffic hours, as approved by the affected jurisdiction.

4. Receipt of construction materials shall be scheduled for non-peak traffic periods where possible. In addition, receipt of construction materials shall be limited to between the hours of 7 AM and 7PM on weekdays, the hours of 9 AM and 6 PM on Saturdays, and prohibited on Sundays and holidays in accordance with the Monterey Park Municipal Code.

MM 2-7 The construction contractor shall utilize off-road construction equipment that conforms to Tier 3 of the United States Environmental Protection Agency, or higher emissions standards for construction equipment over 50 horsepower that are commercially available during site preparation (i.e., grading, trenching). The construction contractor shall be made aware of this requirement prior to the start of construction activities. Use of commercially available Tier 3 or higher off-road equipment, or:
 year 2006 or newer construction equipment for engines rated equal to 175 horsepower (hp) and greater;
 year 2007 and newer construction equipment for engines rated equal to 100 hp but less than 175 hp; and
 2008 and newer construction equipment for engines rated equal to or greater than over 50 hp.

The use of such equipment shall be stated on all grading plans. The construction contractor shall maintain a list of all operating equipment in use on the project site during site preparation (e.g., grading, trenching). The construction equipment list shall state the makes, models, and numbers of construction equipment on-site.

Construction contractor During construction Construction contractor/Public Works
Department

MM 2-8 Preferential parking spaces for employee carpools and vanpools shall be provided onsite. The location of preferential parking for employees carpool/vanpools shall be shown on the parking plans/Precise Plan for the project to the satisfaction of the Community Services Department.

Project applicant Prior to recordation of Final
Map
Community Development
Department

Page 151 of 245 ends

3. Mitigation Monitoring Requirements

Monterey Park Market Place SEIR Mitigation Monitoring Program The Planning Center|DC&E

Page 22 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc| Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Table 3-1
Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
MM 2-9 The applicant shall submit an onsite circulation plan, including parking lots, that shows the flow of internal traffic to minimize vehicle queuing blocking parking aisles or public streets. The circulation plan shall be designed to the satisfaction of the Community Development Department.

Project applicant Prior to recordation of Final
Map
Community Development
Department

MM 2-10 The applicant shall construct an on-street bus shelter(s) subject to the approval of transit agency staff. A pedestrian pathway from the bus shelter(s) to the project site shall be illuminated to ensure a safe path of travel. The location of the bus shelter, pedestrian pathways, and lighting shall be submitted to the City on the circulation plan and/or lighting plans to the satisfaction of the Community Development Department.

Project applicant Prior to approval of first
certificate of occupancy
Community Development
Department

MM 2-11 The applicant shall connect onsite Class III bicycle lanes with off-site bicycle lanes that will link the facility to designated bicycle paths in Monterey Park. Bicycle circulation shall be shown on circulation plans for the project to the satisfaction of the Community Development Department.

Project applicant Prior to recordation of Final
Map
Community Development
Department

MM 2-12 Bicycle parking facilities, such as bicycle lockers and racks for shoppers and employees, shall be provided onsite to the satisfaction of the Community Development Department. The location of bicycle facilities (e.g., lockers and racks) shall be shown on the Precise Plan for the project.

Project applicant Prior to approval of first
certificate of occupancy
Community Development
Department

MM 2-13 The applicant shall construct onsite pedestrian facilities improvements, such as building access that is physically separated from street and parking lot traffic and walk paths. The circulation plan shall include pedestrian connectivity onsite, and the plan shall be prepared to the satisfaction of the Public Works Department.

Project applicant Prior to approval of first
certificate of occupancy
Public Works Department
MM 2-14 The applicant shall synchronize or cause to be synchronized traffic signals on intersections abutting the development prior to approval of the first occupancy permit.

Project applicant Prior to approval of first
certificate of occupancy
Public Works Department

Page 152 of 245 ends

3. Mitigation Monitoring Requirements

Monterey Park Market Place SEIR Mitigation Monitoring Program The Planning Center|DC&E

Page 23 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc| Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Table 3-1
Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
MM 2-15 The applicant shall request in writing that tenants schedule truck deliveries and pickups for off-peak hours where feasible.

Project applicant During project operation Community Development Department

MM 2-16 The applicant shall provide onsite truck loading zones that are shielded from offsite residential areas. The location of loading zones shall be shown on the Precise Plan to the satisfaction of the Community Development Department.

Project applicant Prior to recordation of Final
Map
Community Development
Department

MM 2-17 The applicant shall work with the City to implement or contribute to public outreach programs, which promote alternative methods of transportation such as information kiosks.

Project applicant During project operation Community Development Department

MM 2-18 During all grading activities, the construction contractor shall apply chemical soil stabilizers on inactive areas (i.e., disturbed areas within the site that are unused for four consecutive days).

Construction contractor During construction grading Public Works Department MM 2-19 Grading operations shall be suspended when wind speeds exceed 25 miles per hour.

Construction contractor During construction grading Public Works Department

5.3 GREENHOUSE GAS EMISSIONS
MM 3-1 End-of-trip facilities, such as showers, lockers, and changing spaces, shall be provided for every 80 employee parking spaces, and separate facilities for each gender shall be provided for projects with 160 or more parking spaces. Such facilities shall be incorporated into the site plan prior to issuance of a building permit to the satisfaction of the Community Development Department.

Project applicant Prior to the issuance of a
building permit
Community Development
Department

MM 3-2 Two preferential parking spaces for alternative-fueled vehicles, including electric vehicles (EVs) and/or compressed natural gas (CNG) shall be incorporated into the site plan prior to issuance of a building permit to the satisfaction of the Community Development Department. The spaces shall be equipped with vehicle recharging stations with both conductive and inductive charging capabilities.

Project applicant Prior to the issuance of a
building permit
Community Development
Department

MM 3-3 Applicants for new developments shall coordinate with construction contractors to integrate locally made building materials for construction of the proposed project, where feasible.

Construction contractor During project construction Community Development Department

Page 153 of 245 ends

3. Mitigation Monitoring Requirements

Monterey Park Market Place SEIR Mitigation Monitoring Program The Planning Center|DC&E

Page 24 ends

S:\PLANNING\PC\STAFF REPORTS\2012\09-25-12\Market Place Mitigation Monitoring Program.docP:\CMP-02.0E\FEIR\MMP.doc| Printed: 9/17/2012 8:39 AM11/1/2011 10:29 AM Table 3-1
Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
MM 3-4 Prior to the issuance of a building permit, development plans for these structures shall be required to demonstrate that the project achieves a minimum energy efficiency 5 percent above the 2008 Title 24, Part 6, Energy Efficiency Standards for Residential and Nonresidential Buildings, of the California Building Code requirements. Design strategies to meet this standard may include maximizing solar orientation for daylighting and passive heating/cooling, installing appropriate shading devices and landscaping, utilizing natural ventilation, and installing cool roofs. Other techniques include installing insulation (high reflectivity value) and radiant heat barriers, compact fluorescent and/or light emitting diode light bulbs, and low- emissivity window glazing or double-paned windows. Use of photovoltaics (PV) or other onsite generation of technologies that have equivalent energy reductions may be substituted for an increase in energy efficiency.

Project applicant Prior to the issuance of a
building permit
Community Development
Department

MM 3-5 Prior to issuance of a building permit, plans shall show the use of materials that minimize the absorption of solar heat and subsequent transfer of heat to its surrounding environment. Cool pavement materials shall be used for any roadway or walkways as shown on the landscaping plan of the Precise Plan. Examples of materials that could be used include lighter-colored pavement materials, porous materials, or permeable or porous pavement. Additional examples of cool pavement materials are available at:

http://www.epa.gov/heatisld/images/extra/level3_pavingproducts/.html or similar websites.

Project applicant Prior to the issuance of a
building permit
Community Development
Department

5.4 NOISE
MM 4-1 4-1 During construction, the construction site supervisor shall ensure that the following minimum operating distances for construction equipment and the buildings located along
Neil Armstrong Drive are maintained:
 Loaded trucks and jackhammers – 20 feet
 Large construction equipment (equivalent to a
large bulldozer) – 40 feet
Construction site
supervisor/construction
contractor
During construction Public Works Department

Page 154 of 245 ends
← All documents from this meeting