Cities Index.
Agenda packet

Monterey Park City Council
December 17, 2025

Document
Agenda packet
Meeting
December 17, 2025
Body
Monterey Park City Council
Pages
362
Original file
32.3 MB
Text extracted from the city's file for reading and search. Open the original on montereyparkca.api.civicclerk.com. That file is the official record.

2015/16 2016/17 2017/18 2018/19 2019/20
Assessed valuation 6,591,897 $ 6,934,068 $ 7,269,530 $ 7,651,050 $ 8,089,187 $ Debt limit percentage 15% 15% 15% 15% 15%
Debt limit 988,785 1,040,110 1,090,430 1,147,657 1,213,378 Total net debt applicable to limit:

Pension obligation bonds 13,970 13,520 13,075 12,635 12,200 Legal debt margin 974,815 $ 1,026,590 $ 1,077,355 $ 1,135,022 $ 1,201,178 $ Total debt applicable to the limit
as a percentage of debt limit 1.41% 1.30% 1.20% 1.10% 1.01% Note: In accordance with California Government Code Section 43605, total general obligation bonds outstanding cannot exceed 15 percent of total assessed valuation.

Sources:

1. City of Monterey Park Finance Department

2. HDL Coren & Cone

3. County of Los Angeles Department of Auditor-Controller Fiscal Year
City of Monterey Park
Legal Debt Margin Information
Last Ten Fiscal Years
(In Thousands)
198

Page 265 of 362 ends

2020/21 2021/22 2022/23 2023/24 2024/25
Assessed valuation 8,483,013 $ 8,771,622 $ 9,260,168 $ 9,715,095 $ 10,198,145 Debt limit percentage 15% 15% 15% 15% 15%
Debt limit 1,272,452 1,315,743 1,389,025 1,457,264 1,529,722 Total net debt applicable to limit:

Pension obligation bonds 118,105 114,550 110,270 105,950 101,580 Legal debt margin 1,154,347 $ 1,201,193 $ 1,278,755 $ 1,351,314 $ 1,428,142 $ Total debt applicable to the limit
as a percentage of debt limit 9.28% 8.71% 7.94% 7.27% 6.64% Note: In accordance with California Government Code Section 43605, total general obligation bonds outstanding cannot exceed 15 percent of total assessed valuation.

Sources:

1. City of Monterey Park Finance Department

2. HDL Coren & Cone

3. County of Los Angeles Department of Auditor-Controller City of Monterey Park
Legal Debt Margin Information (Continued)
Last Ten Fiscal Years
(In Thousands)
Fiscal Year
199

Page 266 of 362 ends

This page intentionally left blank.
200

Page 267 of 362 ends

Per Capita
Personal Personal Unemployment
Fiscal Year Population Income Income Rate
2015/16 61,346 563,907,868$ 55,624 $ 5.2% 2016/17 61,606 593,741,110 58,419 4.5% 2017/18 ⁽¹⁾ 62,240 2,514,503 63,720 3.9% 2018/19 61,828 2,544,235 64,513 4.1% 2019/20 60,734 2,790,524 70,647 9.6% 2020/21 60,380 3,006,184 76,614 13.3% 2021/22 60,207 3,018,471 77,339 5.4% 2022/23 59,288 3,133,679 80,423 4.0% 2023/24 59,347 3,372,091 85,518 4.6% 2024/25 59,269 N/A N/A 5.1%
Note: (1) Starting in FY17/18, personal income and per capita personal income are the data shown for California from Bureau of Economic Analysis.

Sources:

1. U.S. Bureau of Economic Analysis

2. HDL Coren & Cone

3. California Employment Development Department
City of Monterey Park
Demographic and Economic Statistics
Last Ten Fiscal Years
201

Page 268 of 362 ends

Percentage of
Number of Total
Employers Employees Employment (1)
GARFIELD MEDICAL CENTER 819 0.017% SOUTHERN CALIFORNIA GAS COMPANY 765 0.016% COSTCO WHOLESALE #1318 449 0.009% MONTEREY PARK HOSPITAL 368 0.008% NETWORK MEDICAL MANAGEMENT INC 325 0.007% HOME DEPOT #2304 225 0.005% RALPHS GROCERY CO (2 LOCATIONS) 161 0.003% BEHAVIOR RESPITE IN ACTION INC 149 0.003% REMITCO L L C 142 0.003% MONTEREY PARK CONVALESCENT HOSPITAL INC 132 0.003% CARMICHAEL INTERNATIONAL SERVICE 130 0.003% CAMINO REAL CHEVROLET 113 0.002% HERITAGE MANOR HEALTHCARE 112 0.002% LA COLONIAL TORTILLA PRODUCTS INC 85 0.002% GREAT WALL SUPERMARKET 75 0.002% 4,763,600.00
Note:
(1) Percentage of total employment is calculated based on Los Angeles County's total employment annual force of 4,812,600 in 2024 and 4,657,000 in 2015.

Sources:

1. City of Monterey Park Finance Department

2. State of California Employment Development Departmen t
2024/25
City of Monterey Park
Principal Employers
(Current Year and Nine Years Ago)
202

Page 269 of 362 ends

Percentage of
Number of Total
Employers Employees Employment (1)
GARFIELD MEDICAL CENTER 976 0.021% CARE 1ST HEALTH PLAN 541 0.012% SOUTHERN CALIFORNIA GAS COMPANY 387 0.008% SYNER MED INC 356 0.008% MONTEREY PARK HOSPITAL 320 0.007% REMITCO LLC 187 0.004% RALPHS GROCERY (2 LOCATIONS) 171 0.004% 24 HOUR FITNESS #867 143 0.003% CHINESE DAILY NEWS 142 0.003% CALIFORNIA PSYCHCARE INC 103 0.002% CAMINO REAL CHEVROLET 100 0.002% MONTEREY PARK CONVALESCENT 92 0.002% SOUTHERN CALIFORNIA EDISON 90 0.002% HERITAGE MANOR HEALTHCARE 90 0.002% LA COLONIAL TORTILLA PRODUCTS INC 85 0.002% 4,572,200.00
Note:
(1) Percentage of total employment is calculated based on Los Angeles County's total employment annual force of 4,812,600 in 2024 and 4,657,000 in 2015.

Sources:

1. City of Monterey Park Finance Department

2. State of California Employment Development Departmen t
2015/16
City of Monterey Park
Principal Employers (Continued)
(Current Year and Nine Years Ago)
203

Page 270 of 362 ends

This page intentionally left blank.
204

Page 271 of 362 ends

Function 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 23-24 24-25 General Government 32 33 33 35 38 40 55 42 44 45 Public Safety
Police 116 119 119 122 122 124 124 126 129 128 Fire 58 59 61 61 66 66 64 64 65 64 Public Works 71 71 71 71 80 83 74 74 72 74 Culture and Recreation
Library 26 26 26 26 25 25 19 24 27 27 Recreation/Community Services 37 37 37 37 36 38 37 37 37 37 Community/Economic Development (1) 14 15 17 17 - - - 15 15 15 Total 352 359 364 368 367 376 373 382 388 390 Note: Numbers represent Full-Time-Equivalent positions. (1) In FY2019-20, personnel and functions from Community/Economic Development are distributed to Fire and Public Works Departments.

In FY2019-20, Code Enforcement Division is under the supervision of Fire Department and Planning and Building Divisions are under the supervision of Public Works Department. In FY22-23, further organizational restructuring moved the Planning and Building Divisions from Public Works and Economic Development Division from the City Manager's Office to become the Community Development Department.

Source: City of Monterey Park Annual Adopted Budget
Fiscal Year
City of Monterey Park
City Employees by Function
Last Ten Fiscal Years
205

Page 272 of 362 ends

2015/16 2016/17 2017/18 2018/19 2019/20
Police:

Number of service calls 54,183 53,646 54,696 53,534 50,153 Response time priority I (emergency) 4:49 4:46 4:22 4:02 3:59 (minutes/seconds)
Fire:

Number of emergency calls 4,985 5,047 5,121 4,355 4,251 Inspections 5,139 3,523 3,523 2,922 3,200 Public works:

Street resurfacing (miles) 2.12 2.71 2.80 - 2.79 Parks and recreation:

Hours of recreation classes 650 600 922 960 640 175 1,197 1,230 2,816 640 Water:

Meters changed and upgrades (2) 98 112 8 5 7 Water turn-ons and turn-offs 2,682 2,440 2,440 2,080 3,471 Average daily consumption 8,000 8,000 8,000 8,000 8,000 (thousand of gallons)
(1) Start FY 2016/17, number of hours of facility rentals are being used. (2) Start FY 2017/18, total meters installed to field-testable and/or field-repairable standards was being omitted.

Sources:

1. City of Monterey Park Annual Budget

2. City of Monterey Park Finance, Fire, Public Works, Recreation Departments Last Ten Fiscal Years
Number of facility rentals/
Number of hours of facility rentals (1)
Note:

Fiscal Year
City of Monterey Park
Operating Indicators by Function
206

Page 273 of 362 ends

2020/21 2021/22 2022/23 2023/24 2024/25
Police:

Number of service calls 49,154 49,899 45,941 50,578 53,410 Response time priority I (emergency) 3:32 3:59 3:39 4:29 4:27 (minutes/seconds)
Fire:

Number of emergency calls 4,979 5,266 5,535 5,420 5,501 Inspections 2,356 1,776 3,972 3,400 3,357 Public works:

Street resurfacing (miles) - 9 12.39 16.66 6.46 Parks and recreation:

Hours of recreation classes 95 441 441 374 380 - 264 690 910 1,451 Water:

Meters changed and upgrades (2) 2 3 2 3 6 Water turn-ons and turn-offs 1,078 1,866 2,000 1,967 1,582 Average daily consumption 8,000 8,000 8,000 8,000 8,000 (thousand of gallons)
(1) Start FY 2016/17, number of hours of facility rentals are being used. (2) Start FY 2017/18, total meters installed to field-testable and/or field-repairable standards was being omitted.

Sources:

1. City of Monterey Park Annual Budget

2. City of Monterey Park Finance, Fire, Public Works, Recreation Departments City of Monterey Park
Operating Indicators by Function (Continued)
Last Ten Fiscal Years
Note:

Number of facility rentals/
Number of hours of facility rentals (1)
Fiscal Year
207

Page 274 of 362 ends

2015/16 2016/17 2017/18 2018/19 2019/20
Police:

Stations 11111
Fire:

Fire stations 33333
Public works:

Streets (miles) 119 119 119 119 119
Streetlights 3,359 3,359 3,359 3,359 3,359
Traffic signal
s 75 75 75 75 75
Parks and recreation:

Parks 14 14 14 14 14
Community centers
Water:

Water mains (miles) 134 134 134 134 134
Maximum Actual Daily Pumped 7,200 6,800 7,000 6,700 6,700 (thousands of gallons)
Wastewater:

Sanitary sewers (miles) 126 126 126 126 126
Storm sewers (miles) 12.43 12.43 12.43 12.43 12.43
Sources:

1. City of Monterey Park Annual Budget

2. City of Monterey Park Water Division
Fiscal Year
City of Monterey Park
Capital Assets by Function
Last Ten Fiscal Years
208

Page 275 of 362 ends

2020/21 2021/22 2022/23 2023/24 2024/25
Police:

Stations 1111 1
Fire:

Fire stations 3333 3
Public works:

Streets (miles) 119 119 119 119 119
Streetlights 3,359 3,359 3,359 3,359 3,359
Traffic signal
s 75 75 75 75 75
Parks and recreation:

Parks 14 14 14 14 14
Community centers
Water:

Water mains (miles) 134 134 134 134 134
Maximum Actual Daily Pumped 6,800 6,300 6,000 5,700 5,900 (thousands of gallons)
Wastewater:

Sanitary sewers (miles) 126 126 126 126 126
Storm sewers (miles) 12.43 12.43 12.43 12.43 12.43
Sources:

1. City of Monterey Park Annual Budget

2. City of Monterey Park Water Division
Fiscal Year
City of Monterey Park
Capital Assets by Function (Continued)
Last Ten Fiscal Years
209

Page 276 of 362 ends

2015/16 2016/17 2017/18 2018/19 2019/20
Type of Customers:

Residential 1,564.2 1,555.6 1,571.6 1,524.5 1,557.1 Commercial 594.0 618.0 610.0 579.5 530.4 Institutional 4.4 6.0 6.0 5.1 5.3 Government 37.3 45.7 98.5 48.8 48.8 Total 2,199.9 2,225.3 2,286.1 2,157.9 2,141.6 Source: City of Monterey Park Public Works Department City of Monterey Park
Water Sold by Type of Customer
Last Ten Fiscal Years
(in millions of gallons)
Fiscal Year
210

Page 277 of 362 ends

2020/21 2021/22 2022/23 2023/24 2024/25
Type of Customers:

Residential 1,734.8 1,552.1 1,847.2 2,195.0 2,357.1 Commercial 507.0 507.8 603.9 1,369.0 1,377.5 Institutional 5.9 5.8 5.8 13.1 16.5 Government 67.6 56.5 60.3 126.2 176.5 Total 2,315.3 2,122.2 2,517.2 3,703.3 3,927.6 Source: City of Monterey Park Public Works Department Water Sold by Type of Customer (Continued)
Last Ten Fiscal Years
(in millions of gallons)
Fiscal Year
City of Monterey Park
211

Page 278 of 362 ends

Monthly Rate per
Base 1,000
Fiscal Year Rate Gallons
2015/16 15.95 2.49 2016/17 17.55 2.89 2017/18 19.30 3.02 2018/19 21.25 3.15 2019/20 19.20 3.01 2020/21 19.20 3.01 2021/22 19.20 3.01 2022/23 19.20 3.01 2023/24 (a) 26.29 3.50 2024/25 28.39 3.65 (a) Rate beginning March 2024
Source: City of Monterey Park Finance Department
Note: Rates are based on 5/8" meter and 3/4 meters (the City is standardizing to 3/4 meters), which is the standard household meter size.

Last Ten Fiscal Years
City of Monterey Park
Water Rates
212

Page 279 of 362 ends

Percent of Percent of
Water Total Water Water Total Water
Water Customer Charges Revenues Charges Revenues
MP 3600 LLC 114,636 $ 0.71% 107,095 $ 1.05% Atlantic Times Square II, LLC 98,539 0.61% 80,016 0.78% Garfield Medical Ctr 92,838 0.57% 88,143 0.86% Aespace America Inc 80,579 0.50%
Atlantic Times Square II, LLC 77,035 0.48% 60,756 0.59% Judicial Council of CA, 19-Q1 73,829 0.46% Garfield Estates 54,722 0.34% 117,032 1.14% Golden Age Village 53,550 0.33%
Atlantic Times Square II, LLC 53,284 0.33% Mtry Pk Intrcm Hosp 53,242 0.33% 49,603 0.48% 752,254$ 4.66% 502,645 $ 4.90% Source: City of Monterey Park Finance Department
2024/25 2020/2021
City of Monterey Park
Top Ten Water Customers
(Current Year and Four Years Ago)
213

Page 280 of 362 ends

This page intentionally left blank.
214

Page 281 of 362 ends

City Council Staff Report

Date: December 17, 2025
Agenda Item Number: 9.C.

To: The Honorable Mayor and City Council
From: Martha Garcia, Director of Finance
Subject: Approval of Tax Agreement with Camino Real Chevrolet

Recommendation:

It is recommended that the City Council consider:

1. Authorizing the City Manager to execute a Closing Agreement with Camino Real Chevrolet in a form approved by the City Attorney, governing payment in lieu of business license tax; and

2. Taking such additional, related, action that may be desirable.

CEQA (California Environmental Quality Act):

These actions are exempt from review under the California Environmental Quality Act (California Public Resources Code §§ 2100, et seq., “CEQA”) and CEQA regulations (14 California Code of Regulations §§ 15000, et seq.) because they establish rules and procedures to implement government funding mechanisms; do not involve any commitment to a specific project which could result in a potentially significant physical impact on the environment; and constitute an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. Accordingly, neither of the propositions constitute a “project” that requires environmental review (see specifically 14 CCR § 15378(b)(4-5)).

Executive Summary:

A closing agreement between the City of Monterey Park and Camino Real Chevrolet is being proposed, in which Camino Real Chevrolet would provide fleet supply to the City in lieu of paying a Business License Tax for a specified period. The tax agreement is designed to offer a mutually beneficial arrangement where Camino Real Chevrolet continues to receive tax incentives while the City benefits from the use of a new vehicles, which could be deployed for public services, community programs, or city operations.

Background:

On November 5, 2024, voters adopted Measure BE which updated the structure of the City’s business license tax (BLT) to be based on a business’s gross receipts. This resulted in Camino Real Chevrolet’s BLT increasing from $1,520.25 in 2024 to $85,950 in 2025.

Page 282 of 362 ends

Camino Real Chevrolet questioned its BLT obligations pursuant to Monterey Park Municipal Code § 5.12.270. That section, in relevant part, states:

“whenever a decision or determination by the license collector of the application of any … rate herein with regard to an application is disputed by a particular applicant, the license collector or the applicant involved, as the case may be, shall request a decision thereon by the city council, whereupon the city council, after listening to the evidence and points of view involved shall make a determination on the particular application, and the city council's decision shall be final.”

MPMC § 5.12.270 and Section 9 of Ordinance No. 2254 (adopted December 10, 2024 aka Measure BE) authorizes the City Council to determine whether Camino Real Chevrolet’s dispute of its calculated tax liability may be resolved through alternative means. One method of resolving the dispute is for Camino Real Chevrolet and the City to execute a “closing agreement” that is authorized under both federal and California law.[1]

The courts universally recognize that closing agreements “are meant to determine finally and conclusively a taxpayer’s liability….”[2] A closing agreement

“is a written contract between the taxpayer and the [taxing authority]. Its purpose is to resolve a tax dispute and it can have an ongoing effect-to resolve an issue expected to rise in the future. The theory behind closing agreements is once and for all to terminate and dispose of tax controversies.”[3]

Camino Real Vehicle and Advertising Proposal
Camino Real proposes to provide the City with one new vehicle per year—owned by the City— and the use of two additional vehicles. The vehicles may be used by the City for any public purpose. The proposal is structured as follows:
• Calendar Year 2025
o Camino Real has made a BLT payment of $9,245 and has agreed to donate $5,000 towards a book mobile for the Bruggemeyer Library. In addition, a payment plan will be set up to collect $2,500 annually over a 10-year period. • Annual Vehicle Use (Beginning in Calendar Year 2026)
o Camino Real Chevrolet will provide the City with one Chevrolet Trax LT valued at $25,580, which will be City-owned.
o If the City elects to acquire a different vehicle, the City will pay the cost difference between the higher-priced vehicle and the present value of a Chevrolet Trax LT. o Camino Real will also provide the use of two additional vehicles, with a combined estimated annual value of $15,000.
o Two loaner vehicles must be approved by City staff and will be replaced every two years, or sooner.

• Advertising
o Camino Real will provide the City with advertising space on its programmable LED message display.
o Advertising rates in Southern California vary widely—from approximately $5,000

Page 283 of 362 ends

to over $50,000 per month—depending on location, size, and whether the display is static or digital.
o The LED message display is not currently being used but is planned to be refurbished. Once refurbishment is complete, Camino Real will begin providing advertising space to the City.
• City Vehicle Maintenance
o The City would be provided with a 30% discount on fleet service, including labor and parts. On average, the City expends approximately $30,000 annually on related repair costs for third party service.

Executing the closing agreement is in the public interest as it avoids an ongoing dispute with Camino Real Chevrolet regarding its business license tax obligations. In return, the City nevertheless receives value in the form of vehicles that may be used for public purposes including, without limitation, law enforcement and general fleet needs. The value received is substantially similar to the monies that would be otherwise paid by Camino Real Chevrolet under Measure BE.

[1] 26 U.S.C. § 7121; Rev. & Tax. Code §§ 19(441 and 19442. [2] In re Hopkins (9th Cir., 1998) 146 F.3d 729, 732.
[3] Emphasis added. States S. S. Co. v. IRS (9th Cir. 1982) 683 F.2d 1282, 1284.

Strategic Plan Goal:

N/A

Fiscal Impact:

Camino Real’s contributions in lieu of taxes are estimated to be $39,245 for the year 2025. In each subsequent year, the estimated annual value increases to $100,580. This arrangement enables the City to receive tangible assets, services, and promotional benefits while also avoiding substantial administrative and legal expenses associated with continued tax disputes.

Attachments:

None

Page 284 of 362 ends

City Council Staff Report

Date: December 17, 2025
Agenda Item Number: 9.D.

To: The Honorable Mayor and City Council
From: Christine Tomikawa, Human Resources/Risk Management Director Subject: Resolution approving FY 2025-2026 City of Monterey Park Comprehensive Salary schedule and Part-Time Salary Schedule

Recommendation:

It is recommended that the City Council consider:

1. Adopting a Resolution approving the revised FY 2025-2026 City of Monterey Park Comprehensive Salary Schedule;

2. Approving the Revised Part-Time Classification Salary Ranges; and

3. Taking such additional, related, action that may be desirable.

Executive Summary:

California law requires that the City maintain a publicly available comprehensive salary schedule listing all full-time and part-time employee classifications with associated salary ranges in a single document (2 Cal. Code of Regs. § 570.5). Beginning in June 2025, the City Council approved various memoranda of understanding ("MOUs") with the City's bargaining units. The MOUs approved by the City Council provided for salary range increases, necessitating updates to the City's comprehensive salary schedule. The Director is also requesting approval to increase part-time classification salary ranges to keep in line with California's minimum wage increases. The resolution will approve the revised comprehensive salary schedule, to include salary range increases for part-time classifications.

Background:

During 2025, the City negotiated six MOUs and one Executive team Resolution. Through this negotiation process, the City Council approved salary range increase for each of the City's bargaining units: POA Reso. 2025-R59, POMMA Reso. 2025-R65, Police Captains' Reso. 2025-R79, FFA Reso 2025-R80, PCOA Reso. 2025-R73, SEIU Reso. 2025-R67, MMCA Reso. 2025-R66, and Executive Management Reso. 2025-R77. The revised comprehensive salary schedule reflects the up-to-date salary ranges approved for Fiscal Year 2025-2026 by the City Council and compliant with California law and the Municipal Code.

The Director recommends that the City Council approve a salary range increase for part-time

Page 285 of 362 ends

("PT") classifications in order for these positions to comply with State minimum wage increases. The current entry level PT classification hourly rate is $16.32 and in January 2025 the State minimum wage hourly rate was increased to $16.50. The minimum wage will increase to $16.90/hour in January 2026. The recommended PT salary range increase is a

4.0% cost of living adjustment which will increase the $16.32/houly rate to $16.97/hour, retroactive to July 5, 2025.

Strategic Plan Goal:

This action supports the City Council's Strategic Plan Goal of maintaining stability of the City's Human Resources by strengthening workforce recruitment.

Fiscal Impact:

No additional funds are requested. Fiscal Year 2025-2026 budgeted funds are sufficient to cover the revised part-time salary ranges.

Attachments:

1. Comprehensive Salary Schedule Resolution

2. Exhibit A - City of Monterey Park Salary Schedule

Page 286 of 362 ends

Staff Report
December 17, 2025

ATTACHMENT 1
Comprehensive Salary Schedule FY 2025-2026
Resolution

Page 287 of 362 ends

Staff Report
December 17, 2025

RESOLUTION NO. ____

A RESOLUTION APPROVING THE REVISED SALARY RANGES FOR

CITY EMPLOYEES AND AUTHORIZING THE CITY MANAGER TO
IMPLEMENT SUCH CHANGES IN THE CITY’S SALARY SCHEDULE.

THE CITY COUNCIL RESOLVES AS FOLLOWS:

SECTION 1: The City Council authorizes the City Manager, or designee, to compensate all full-time and part-time classifications at the rates set forth in the attached Salary Schedule (Exhibit “A”), which is incorporated by reference. The rates set forth in Exhibit A for part-time classifications are effective as of July 5, 2025.

SECTION 2: Conflict with Old Salary Schedules. All prior resolutions and salary schedules in conflict with this resolution are hereby rescinded.

SECTION 3: Authority. The City Council has authority to adopt this resolution under Government Code § 37206, which requires the City Council to prescribe the time and method of paying salaries, wages and benefits for employees of the City, and Monterey Park Municipal Code Chapter 2.36 (Salaries), which also requires the City Council to establish a salary schedule by resolution.

SECTION 4: Electronic Signatures. This Resolution may be executed with electronic signatures in accordance with Government Code §16.5. Such electronic signatures will be treated in all respects as having the same effect as an original signature.

SECTION 5: Construction. This Resolution must be broadly construed to achieve the purposes stated in this Resolution. It is the City Council’s intent that the provisions of this Resolution be interpreted or implemented by the City and others in a manner that facilitates the purposes set forth in this Resolution.

SECTION 6: Effective Date. This Resolution will become effective immediately upon adoption.

PASSED AND ADOPTED this ____ day of _________, 20__.

____________________________
Elizabeth Yang, Mayor
ATTEST:

________________________________
Maychelle Yee, City Clerk

APPROVED AS TO FORM:

________________________________
Karl H. Berger, City Attorney

Page 288 of 362 ends

EXHIBIT A City of Monterey Park Salary Schedule
Effective July 5, 2025
Monthly Compensation
$500
$500
$500
Bargaining Unit Effective Date Salary
Contract 11/15/2023 $265,000
Job Classification Bargaining Unit Effective Date Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Account Clerk SEIU 7/5/2025 $4,427 $4,652 $4,887 $5,135 $5,526 Accountant SEIU 7/5/2025 $6,235 $6,551 $6,884 $7,231 $7,783 Administrative Aide SEIU 7/5/2025 $5,439 $5,714 $6,003 $6,307 $6,788 Administrative Assistant (formerly Police Admin MPMMCA 7/5/2025 $5,046 $6,445 Administrative Manager Unrepresented/At-Will 7/5/2025 $10,846 $13,876 Adult Literacy Coordinator MPMMCA 7/5/2025 $7,762 $9,929 Animal Services Officer SEIU 7/5/2025 $4,715 $4,954 $5,205 $5,468 $5,885 Animal Control Supervisor MPMMCA 7/5/2025 $7,762 $9,929 Assistant City Engineer/Assistant Director MPMMCA 7/5/2025 $11,735 $15,012 Assistant City Manager Executive Management 7/5/2025 $17,406 - - - $22,947 Assistant Deputy City Clerk SEIU 7/5/2025 $5,688 $5,976 $6,279 $6,596 $7,101 Assistant Planner SEIU 7/5/2025 $6,420 $6,746 $7,086 $7,446 $8,013 Assistant to City Manager MPMMCA 7/5/2025 $9,541 $12,207 Assistant Water Utility Manager Unrepresented/At-Will 7/5/2025 $9,541 $12,207 Associate Planner SEIU 7/5/2025 $7,288 $7,657 $8,045 $8,453 $9,097 Auto Shop Technician SEIU 7/5/2025 $4,725 $4,965 $5,216 $5,480 $5,898 Battalion Chief Fire Management 7/5/2025 $13,172 $16,038 Building Inspector SEIU 7/5/2025 $7,182 $7,545 $7,927 $8,329 $8,964 Building Official Unrepresented/At-Will 7/5/2025 $10,394 $13,296 Building Trades Technician SEIU 7/5/2025 $5,598 $5,881 $6,179 $6,491 $6,986 Child Care Assistant SEIU 7/5/2025 $4,322 $4,542 $4,771 $5,013 $5,395 City Librarian Executive Management 7/5/2025 $13,557 - - - $20,470 Civil Engineering Assistant SEIU 7/5/2025 $6,972 $7,325 $7,696 $8,085 $8,701 Civil Engineering Associate MPMMCA 7/5/2025 $8,264 $10,573 Civil Engineering Technician SEIU 7/5/2025 $6,059 $6,366 $6,688 $7,026 $7,563 Code Compliance Supervisor MPMMCA 7/5/2025 $7,762 $9,929 Code Enforcement Officer SEIU 7/5/2025 $5,739 $6,029 $6,334 $6,655 $7,163 Communication Dispatcher SEIU 7/5/2025 $5,924 $6,225 $6,540 $6,871 $7,394 Communications Dispatcher Trainee SEIU 7/5/2025 $4,896 $5,144 $5,404 $5,678 $6,110 City Manager

FULL-TIME SALARY SCHEDULE
City Treasurer
Job Classification
Elected Official
City Council
City Clerk

Page 1 of 6 ends
Page 289 of 362 ends

EXHIBIT A City of Monterey Park Salary Schedule
Effective July 5, 2025
Job Classification Bargaining Unit Effective Date Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Communications Supervisor MPMMCA 7/5/2025 $7,762 $9,929 Community Service Officer SEIU 7/5/2025 $4,708 $4,946 $5,197 $5,460 $5,876 Consumer Service Representative SEIU 7/5/2025 $5,294 $5,562 $5,843 $6,139 $6,607 Crew Leader SEIU 7/5/2025 $5,598 $5,881 $6,179 $6,491 $6,986 Cross Connection Control Inspector SEIU 7/5/2025 $7,105 $7,464 $7,843 $8,239 $8,867 Deputy City Clerk MPMMCA 7/5/2025 $9,117 $11,663
Deputy Fire Chief Fire Management 7/5/2025 $14,434 $18,026 Deputy Fire Marshal MPMMCA 7/5/2025 $7,690 $9,837
Dial-A-Ride Dispatcher SEIU 7/5/2025 $4,708 $4,946 $5,197 $5,460 $5,876 Dial-A-Ride Driver SEIU 7/5/2025 $3,174 $3,335 $3,503 $3,681 $3,962 Director of Community & Economic Development Executive Management 7/5/2025 $13,557 - - - $20,470 Director of Finance Executive Management 7/5/2025 $13,557 - - - $20,470 Director of Human Resources & Risk Executive Management 7/5/2025 $13,557 - - - $20,470 Director of Public Works Executive Management 7/5/2025 $13,557 - - - $20,470 Director of Recreation & Community Services Executive Management 7/5/2025 $13,557 - - - $20,470 Economic Development Manager MPMMCA 7/5/2025 $9,686 $12,393 Economic Development Specialist SEIU 7/5/2025 $6,972 $7,325 $7,696 $8,085 $8,701 Electrician SEIU 7/5/2025 $6,059 $6,366 $6,688 $7,026 $7,563 Equipment Mechanic SEIU 7/5/2025 $5,598 $5,881 $6,179 $6,491 $6,986 Equipment Service Specialist SEIU 7/5/2025 $4,725 $4,965 $5,216 $5,480 $5,898 Evidence Officer SEIU 7/5/2025 $5,083 $5,340 $5,611 $5,895 $6,344 Executive Assistant (formerly Police Chief

MPMMCA 7/5/2025 $6,232 $7,973
Facilities Maintenance Supervisor MPMMCA 7/5/2025 $7,762 $9,929 Financial Manager Unrepresented/At-Will 7/5/2025 $11,817 $15,117 Financial Analyst MPMMCA 7/5/2025 $7,762 $9,929
Fire Captain Firefighters 8/16/2025 $10,527 $11,054 $11,606 $12,187 $12,796 Fire Chief Executive Management 7/5/2025 $17,406 - - - $22,947 Fire Engineer Firefighters 8/16/2025 $9,037 $9,488 $9,962 $10,460 $10,983 Fire Marshall MPMMCA 7/5/2025 $10,239 $13,100
Fire Prevention Permit Technician SEIU 7/5/2025 $5,172 $5,434 $5,709 $5,997 $6,455 Fire Recruit SEIU 7/5/2025 $5,553
Fire Safety Specialist SEIU 7/5/2025 $6,804 $7,149 $7,511 $7,890 $8,493 Firefighter Firefighters 8/16/2025 $7,809 $8,199 $8,608 $9,039 $9,491 Fleet Maintenance Supervisor MPMMCA 7/5/2025 $7,762 $9,929 Geographic Information Systems Analyst SEIU 7/5/2025 $6,932 $7,283 $7,651 $8,038 $8,651 Human Resources Analyst MPMMCA 7/5/2025 $7,334 $9,383
Human Resources Specialist MPMMCA 7/5/2025 $6,232 $7,973 Human Resources Technician MPMMCA 7/5/2025 $5,458 $6,984

Page 2 of 6 ends
Page 290 of 362 ends

EXHIBIT A City of Monterey Park Salary Schedule
Effective July 5, 2025
Job Classification Bargaining Unit Effective Date Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Human Resources/Risk Management Manager Unrepresented/At-Will 7/5/2025 $11,620 $14,864 Information Systems Specialist MPMMCA 7/5/2025 $7,904 $10,111 Information Technology Services Manager Unrepresented/At-Will 7/5/2025 $11,620 $14,864 Information Technology Technician I SEIU 7/5/2025 $5,739 $6,029 $6,334 $6,655 $7,163 Information Technology Technician II SEIU 7/5/2025 $6,804 $7,149 $7,511 $7,890 $8,493 Irrigation Specialist SEIU 7/5/2025 $4,725 $4,965 $5,216 $5,480 $5,898 Jail Supervisor MPMMCA 7/5/2025 $7,762 $9,929
Jailer SEIU 7/5/2025 $4,977 $5,228 $5,493 $5,771 $6,211 Lead Equipment Mechanic SEIU 7/5/2025 $6,438 $6,763 $7,106 $7,466 $8,034 Librarian SEIU 7/5/2025 $6,489 $6,818 $7,162 $7,525 $8,098 Library Assistant SEIU 7/5/2025 $4,322 $4,542 $4,771 $5,013 $5,395 Library Circulation Service Supervisor SEIU 7/5/2025 $4,934 $5,184 $5,446 $5,721 $6,159 Library Manager Unrepresented/At-Will 7/5/2025 $9,690 $12,397 Library Technician SEIU 7/5/2025 $4,934 $5,184 $5,446 $5,721 $6,159 Maintenance Worker SEIU 7/5/2025 $4,498 $4,725 $4,965 $5,216 $5,614 Management Aide SEIU 7/5/2025 $5,467 $5,742 $6,034 $6,338 $6,821 Management Analyst SEIU 7/5/2025 $6,932 $7,283 $7,651 $8,038 $8,651 Media Specialist I SEIU 7/5/2025 $5,172 $5,434 $5,709 $5,997 $6,455 Media Specialist II SEIU 7/5/2025 $5,711 $6,000 $6,304 $6,623 $7,128 Media Supervisor MPMMCA 7/5/2025 $7,762 $9,929
Office Assistant (Non-Confidential) SEIU 7/5/2025 $4,322 $4,542 $4,771 $5,013 $5,395 Outreach and Housing Navigation Coord. SEIU 7/5/2025 $5,823 $6,118 $6,428 $6,753 $7,268 Park Maintenance Crew Leader SEIU 7/5/2025 $5,598 $5,881 $6,179 $6,491 $6,986 Park Maintenance Lead Worker SEIU 7/5/2025 $5,205 $5,468 $5,745 $6,036 $6,496 Park Maintenance Worker SEIU 7/5/2025 $4,498 $4,725 $4,965 $5,216 $5,614 Park Supervisor MPMMCA 7/5/2025 $7,762 $9,929
Payroll Technician MPMMCA 7/5/2025 $5,532 $7,077
Permit Technician I SEIU 7/5/2025 $5,172 $5,434 $5,709 $5,997 $6,455 Permit Technician II SEIU 7/5/2025 $5,739 $6,029 $6,334 $6,655 $7,163 Plan Checker SEIU 7/5/2025 $7,689 $8,078 $8,487 $8,917 $9,597 Planning Manager Unrepresented/At-Will 7/5/2025 $10,949 $14,007 Planning Technician SEIU 7/5/2025 $5,439 $5,714 $6,003 $6,307 $6,788 Police Captain Police Captains 7/5/2025 $17,121 $19,688 Police Chief Executive Management 7/5/2025 $17,406 - - - $22,947 Police Clerk SEIU 7/5/2025 $4,369 $4,591 $4,823 $5,067 $5,454 Police Corporal POA 7/5/2025 $8,858 $9,301 $9,766 $10,254 $10,767 Police Lieutenant Police Mid-Management 7/5/2025 $14,114 $16,231 Police Officer POA 7/5/2025 $8,214 $8,626 $9,058 $9,510 $9,985

Page 3 of 6 ends
Page 291 of 362 ends

EXHIBIT A City of Monterey Park Salary Schedule
Effective July 5, 2025
Job Classification Bargaining Unit Effective Date Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Police Officer Recruit SEIU 7/5/2025 $5,553 - - - -
Police Records Supervisor MPMMCA 7/5/2025 $7,762 $9,929 Police Sergeant Police Mid-Management 7/5/2025 $11,591 $13,329 Pool Maintenance Worker SEIU 7/5/2025 $4,498 $4,725 $4,965 $5,216 $5,614 Principal Management Analyst MPMMCA 7/5/2025 $8,594 $10,993 Program Coordinator SEIU 7/5/2025 $5,439 $5,714 $6,003 $6,307 $6,788 Public Works Inspector SEIU 7/5/2025 $6,424 $6,749 $7,091 $7,449 $8,018 Public Works Maint. Manager MPMMCA 7/5/2025 $10,846 $13,876 Public Works Supervisor MPMMCA 7/5/2025 $7,762 $9,929
Public Works Technician SEIU 7/5/2025 $5,439 $5,714 $6,003 $6,307 $6,788 Recreation Manager Unrepresented/At-Will 7/5/2025 $9,690 $12,397 Recreation Specialist SEIU 7/5/2025 $4,322 $4,542 $4,771 $5,013 $5,395 Recreation Supervisor MPMMCA 7/5/2025 $7,762 $9,929
Secretary (non-conf) SEIU 7/5/2025 $5,172 $5,434 $5,709 $5,997 $6,455 Senior Account Clerk (Non-Confidential) SEIU 7/5/2025 $5,172 $5,434 $5,709 $5,997 $6,455 Senior Accountant MPMMCA 7/5/2025 $7,904 $10,111
Senior Administrative Assistant (formerly Admin

MPMMCA 7/5/2025 $5,307 $6,788
Senior Civil Engineer MPMMCA 7/5/2025 $9,690 $12,397
Senior Code Compliance Officer SEIU 7/5/2025 $6,420 $6,746 $7,086 $7,446 $8,013 Senior Librarian MPMMCA 7/5/2025 $7,762 $9,929
Senior Library Assistant SEIU 7/5/2025 $4,715 $4,954 $5,205 $5,468 $5,885 Senior Maintenance Worker SEIU 7/5/2025 $4,896 $5,144 $5,404 $5,678 $6,110 Senior Management Analyst SEIU 7/5/2025 $8,227 $8,644 $9,082 $9,542 $10,270 Senior Planner MPMMCA 7/5/2025 $8,662 $11,082
Senior Water Production System Operator SEIU 7/5/2025 $6,596 $6,930 $7,281 $7,649 $8,232 Support Services Supervisor SEIU 7/5/2025 $6,804 $7,149 $7,511 $7,890 $8,493 Water Distribution Crew Supervisor SEIU 7/5/2025 $6,596 $6,930 $7,281 $7,649 $8,232 Water Distribution Lead Worker SEIU 7/5/2025 $5,692 $5,980 $6,283 $6,601 $7,104 Water Supervisor MPMMCA 7/5/2025 $7,762 $9,929
Water Production System Operator SEIU 7/5/2025 $5,841 $6,136 $6,447 $6,774 $7,290 Water Utility Maintenance Worker SEIU 7/5/2025 $4,879 $5,126 $5,385 $5,658 $6,089 Water Utility Manager Unrepresented/At-Will 7/5/2025 $11,620 $14,864 Unrepresented/At-Will 7/5/2025 $23.55 $24.14 $24.74 $25.97 $27.27 $28.63 Unrepresented/At-Will 7/5/2025 $32.22 $33.03 $33.85 $35.55 $37.33 $39.19 Unrepresented/At-Will 7/5/2025 $28.10 $28.80 $29.52 $30.99 $32.54 $34.17 Unrepresented/At-Will 7/5/2025 $28.10 $28.80 $29.52 $30.99 $32.54 $34.17 Unrepresented/At-Will 7/5/2025 $18.21 $18.67 $19.14 $20.09 $21.09 $22.15 Account Clerk
Accountant
Administrative Assistant
Administrative Aide
Administrative Intern I

PART-TIME SALARY SCHEDULE

Page 4 of 6 ends
Page 292 of 362 ends

EXHIBIT A City of Monterey Park Salary Schedule
Effective July 5, 2025
Job Classification Bargaining Unit Effective Date Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Unrepresented/At-Will 7/5/2025 $23.55 $24.14 $24.74 $25.97 $27.27 $28.63 Unrepresented/At-Will 7/5/2025 $24.32 $24.93 $25.54 $26.82 $28.16 $29.58 Unrepresented/At-Will 7/5/2025 $32.22 $33.03 $33.85 $35.55 $37.33 $39.19 Unrepresented/At-Will 7/5/2025 $23.55 $24.14 $24.74 $25.97 $27.27 $28.63 Unrepresented/At-Will 7/5/2025 $35.68 $36.57 $37.49 $39.36 $41.33 $43.39 Unrepresented/At-Will 7/5/2025 $30.62 $31.38 $32.17 $33.77 $35.46 $37.23 Unrepresented/At-Will 7/5/2025 $18.21 $18.67 $19.14 $20.09 $21.09 $22.15 Unrepresented/At-Will 7/5/2025 $39.25 $40.23 $41.24 $43.30 $45.46 $47.73 Unrepresented/At-Will 7/5/2025 $30.62 $31.38 $32.17 $33.77 $35.46 $37.23 Unrepresented/At-Will 7/5/2025 $30.62 $31.38 $32.17 $33.77 $35.46 $37.23 Unrepresented/At-Will 7/5/2025 $16.97 $17.39 $17.83 $18.72 $19.66 $20.63 Unrepresented/At-Will 7/5/2025 $24.32 $24.93 $25.54 $26.82 $28.16 $29.58 Unrepresented/At-Will 7/5/2025 $23.55 $24.14 $24.74 $25.97 $27.27 $28.63 Unrepresented/At-Will 7/5/2025 $18.21 $18.67 $19.14 $20.09 $21.09 $22.15 Unrepresented/At-Will 7/5/2025 $35.68 $36.57 $37.49 $39.36 $41.33 $43.39 Unrepresented/At-Will 7/5/2025 $32.22 $33.03 $33.85 $35.55 $37.33 $39.19 Unrepresented/At-Will 7/5/2025 $20.33 $20.84 $21.36 $22.43 $23.55 $24.73 Unrepresented/At-Will 7/5/2025 $30.62 $31.38 $32.17 $33.77 $35.46 $37.23 Unrepresented/At-Will 7/5/2025 $24.32 $24.93 $25.54 $26.82 $28.16 $29.58 Unrepresented/At-Will 7/5/2025 $25.96 $26.60 $27.27 $28.63 $30.07 $31.56 Unrepresented/At-Will 7/8/2023 $30.00 - - - - $80.00
Unrepresented/At-Will 7/8/2023 $81.00 - - - - $130.00
Unrepresented/At-Will 7/5/2025 $32.22 $33.03 $33.85 $35.55 $37.33 $39.19 Unrepresented/At-Will 7/5/2025 $35.68 $36.57 $37.49 $39.36 $41.33 $43.39 Unrepresented/At-Will 7/5/2025 $30.62 $31.38 $32.17 $33.77 $35.46 $37.23 Unrepresented/At-Will 7/5/2025 $25.96 $26.60 $27.27 $28.63 $30.07 $31.56 Unrepresented/At-Will 7/5/2025 $32.22 $33.03 $33.85 $35.55 $37.33 $39.19 Unrepresented/At-Will 7/5/2025 $23.55 $24.14 $24.74 $25.97 $27.27 $28.63 Unrepresented/At-Will 7/5/2025 $16.97 $17.39 $17.83 $18.72 $19.66 $20.63 Unrepresented/At-Will 7/5/2025 $25.96 $26.60 $27.27 $28.63 $30.07 $31.56 Unrepresented/At-Will 7/5/2025 $18.21 $18.67 $19.14 $20.09 $21.09 $22.15 Unrepresented/At-Will 7/5/2025 $39.61 $40.60 $41.62 $43.70 $45.88 $48.18 Unrepresented/At-Will 7/5/2025 $24.32 $24.93 $25.54 $26.82 $28.16 $29.58 Unrepresented/At-Will 7/5/2025 $35.68 $36.57 $37.49 $39.36 $41.33 $43.39 Unrepresented/At-Will 7/5/2025 $20.33 $20.84 $21.36 $22.43 $23.55 $24.73 Office Assistant I Unrepresented/At-Will 7/5/2025 $18.21 $18.67 $19.14 $20.09 $21.09 $22.15 Office Assistant II Unrepresented/At-Will 7/5/2025 $23.55 $24.14 $24.74 $25.97 $27.27 $28.63 Unrepresented/At-Will 7/5/2025 $25.96 $26.60 $27.27 $28.63 $30.07 $31.56Permit Technician Lifeguard
Literacy Program Coordinator
Maintenance Worker
Management Analyst
Minutes Clerk
Library Technician
Equipment Mechanic
Equipment Service Specialist
Evidence Officer
Fire Safety Specialist
Human Resources Analyst
Human Resources Technician
Extra Help I Retirees (range)
Extra Help II Retirees (range)
Jailer
Librarian
Library Assistant
Library Page
Dial-A-Ride Driver
Communications Dispatcher
Economic Development Specialist
Electrician
Engineering Aide
Crime Analyst
Civil Engineering Assoc.

Code Enforcement Officer
Community Media Specialist
Community Service Officer
Assistant Pool Manager
Building Inspector
Building Trades Technician
Child Care Teacher
Administrative Intern II
Animal Services Officer
Assistant Planner

Page 5 of 6 ends
Page 293 of 362 ends

EXHIBIT A City of Monterey Park Salary Schedule
Effective July 5, 2025
Job Classification Bargaining Unit Effective Date Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Unrepresented/At-Will 7/5/2025 $28.10 $28.80 $29.52 $30.99 $32.54 $34.17 Unrepresented/At-Will 7/5/2025 $16.97 $17.39 $17.83 $18.72 $19.66 $20.63 Unrepresented/At-Will 7/5/2025 $23.55 $24.14 $24.74 $25.97 $27.27 $28.63 Unrepresented/At-Will 7/5/2025 $16.97 $17.39 $17.83 $18.72 $19.66 $20.63 Unrepresented/At-Will 7/5/2025 $30.62 $31.38 $32.17 $33.77 $35.46 $37.23 Unrepresented/At-Will 7/5/2025 $25.96 $26.60 $27.27 $28.63 $30.07 $31.56 Unrepresented/At-Will 7/5/2025 $43.17 $44.25 $45.36 $47.63 $50.01 $52.50 Unrepresented/At-Will 7/5/2025 $25.96 $26.60 $27.27 $28.63 $30.07 $31.56 Unrepresented/At-Will 7/5/2025 $16.97 $17.39 $17.83 $18.72 $19.66 $20.63 Unrepresented/At-Will 7/5/2025 $20.33 $20.84 $21.36 $22.43 $23.55 $24.73 Unrepresented/At-Will 7/5/2025 $16.97 $17.39 $17.83 $18.72 $19.66 $20.63 Unrepresented/At-Will 7/5/2025 $28.10 $28.80 $29.52 $30.99 $32.54 $34.17 Unrepresented/At-Will 7/5/2025 $39.61 $40.60 $41.62 $43.70 $45.88 $48.18 Unrepresented/At-Will 7/5/2025 $20.33 $20.84 $21.36 $22.43 $23.55 $24.73 Unrepresented/At-Will 7/5/2025 $39.25 $40.23 $41.24 $43.30 $45.46 $47.73 Unrepresented/At-Will 7/5/2025 $39.25 $40.23 $41.24 $43.30 $45.46 $47.73 Unrepresented/At-Will 7/5/2025 $30.62 $31.38 $32.17 $33.77 $35.46 $37.23 Unrepresented/At-Will 7/5/2025 $25.96 $26.60 $27.27 $28.63 $30.07 $31.56 Senior Planner
Water Production System Operator
Water Utility Maintenance Worker
Senior Account Clerk
Recreation Leader II
Senior Management Analyst
School Crossing Guard
Senior Librarian
Senior Lifeguard/Instructor
Planning Technician
Police Cadet
Police Records Cadet
Police Clerk
Police Records Mgmt Tech
Pool Manager
Principal Management Analyst
Program Coordinator
Recreation Leader I

Page 6 of 6 ends
Page 294 of 362 ends

City Council Staff Report

Date: December 17, 2025
Agenda Item Number: 9.E.

To: The Honorable Mayor and City Council
From: Shawn Igoe, Public Works Director
Subject: Bruggemeyer Library Project

Recommendation:

It is recommended that the City Council consider:

1. Authorizing the City Manager to execute a Professional Services agreement with Black, O’Dowd & Associates, dba BOA Architecture, for the preparation of Plans, Specifications and Engineer’s estimates (“PS&E”) for various library improvements in an amount not to exceed $89,000; and

2. Taking such additional, related, action that may be desirable.

Executive Summary:

The Bruggemeyer Library was constructed over 20 years ago and some of the interior spaces no longer meet the current space demands to accommodate the community needs. The proposed improvements will enable staff to use the various areas more efficiently, and to support various new public programs. Public Works Director (“Director”) requested a proposal from BOA Architecture for the proposed work. The Director requests City Council approval to enter into a professional services agreement with BOA Architecture in an amount not to exceed $89,000, for the preparation of PS&E for library improvements (the “Contract”).

Background:

The Bruggemeyer Library was constructed over 20 years ago and some of the interior spaces no longer meet the current space demands to accommodate the community needs. The proposed improvements will enable staff to use the various areas more efficiently, and to support various new public programs.

The proposed improvements listed below (Project) is anticipated to include the following:

• Provide a new, dedicated space for passport services • Redesign the public circulation counter area to better fit the needs of the public and staff • Create entry lobby with a new public service counter

Page 295 of 362 ends

• Remove some walls in the circulation staff area to create an open staff office with workstations
• Install doors next to the stairs to separate the public from staff areas • Redesign the technical services area to create a large multi-purpose room for flexible public programming
• Provide ingress and egress to the outside for the multi-purpose area that is accessible to the public
• Ensure ADA compliance with all proposed modifications • Install new multi-language signage

The Director received a proposal from BOA Architecture for $89,000. The Director is currently working with BOA Architecture for the redesign of the City Council Chambers and is satisfied with the provided services.

It is recommended that City Council authorize the City Manager to execute an agreement with BOA Architecture in an amount not to exceed $89,000, for the preparation of PS&E for the Bruggemeyer Library Improvements.

Strategic Plan Goal:

This Project meets the City’s goal to maintain, build and modernize infrastructure and facilities to support the current and future needs of our City and community as it aims to continue public facility improvements and provide multiple forms of usage of the Bruggemeyer Library.

Fiscal Impact:

The proposed contract cost will not exceed $89,000. Funds for this project are budgeted as part of Capital Improvement Project (“CIP”) 95060.

Attachments:

1. Proposal

Page 296 of 362 ends

ATTACHMENT 
BOA ArchitectsProposal
6WDII5HSRUW
'HFHPEHU

Page 297 of 362 ends

1511 Cota Avenue
Long Beach, CA 90813
Telephone: 562-912-7900
Telephone: 310-832-2681
www.boaarchitecture.com
Ziad Mazboudi, PE, Project Manager, City of Monterey Park Nov. 19, 2025 Re: Fee for Architectural-Engineering Services for: Monterey Park Bruggemeyer Library Remodel Based on our site meeting with you on 10-29-25 we are pleased to submit our Fee Proposal for PSE (plans, specs, estimate) for approval from the City Building Safety Dept. and for customary public bidding to general contractors. We will also provide Construction Support services. We will remodel parts of the 1st floor and parts of the 2nd floor. Our scope for this project is outlined below, and our itemized fee spreadsheet is attached. Also attached is a sketch floor plan showing the location of the area to be remodeled.

Scope for Interior Remodel

1. On the 1 st floor, 1) provide a new door for the passport services, 2) redesign the public circulation counter area to fit the current needs of the staff, 3) remove some walls in the staff area to create an open staff office with workstations, 4) install some doors next to the stairs to separate the public from the staff, 5) redesign the technical services area to create a large multi-purpose room for 40 to 50 people (with storage) for flexible programming, 6) preserve existing storage shelves, 7) maintain access for staff to the exterior loading area.

2. Maintain access for staff via the exterior loading area. The Client wants to create an entrance to the new programming, large multi-purpose space that is accessible to the public from the outside. This would allow the Client to provide programs before/after library hours. The understanding is to maintain a path-of- travel for ADA compliance, so the door would likely need to be on the east wall of the building leading out to the covered parking. Provide a ceiling mounted projector or wall mounted TV screen in the new large multi-purpose space for presentations.

3. On the 2 nd floor, at the Literacy Dept, create a small entry lobby with a new public service counter with easy access for the library staff. Multi-lingual signage is needed for this area. For the Literacy Dept., The Client likes the idea of maintaining separation between the Literacy Dept. and the Children’s Dept. and would like to keep the study room wall that separates the two spaces but convert that study room into the public service desk.

4. Provide design for ADA compliance for the area within the scope, as required by Building-Safety Dept.

5. Because of its high construction cost, work within the existing building envelope, avoid a building addition.

6. Verify site conditions w measurements and do a walk-thru with the library staff to verify desired functionality space allocation goals.

7. In the preliminary design phase, create conceptual 2-3 floor plan options for the Client to select the desired one that will be refined into a final recommendation. Provide 3-dimensional color renderings showing especially the library circulation public counter.

8. Project management and meetings to expedite the project and communicate with Client.

9. Provide submittals at 30%, 60%, 90%, 100%.

10. Provide Construction Cost Estimate.

11. Provide formal specifications.

12. Provide interior design improvements to enhance or be compatible with the existing Library architecture.

13. Provide structural engineering for new interior walls and openings.

14. Provide mechanical engineering for the new HVAC ducting for the new reconfigured layout. There is no new HVAC equipment for this project. We plan to use the existing HVAC equipment.

15. Provide electrical engineering for relocation of existing or new electrical lighting and power.

16. Provide acoustic engineering to mitigate echo and reverberation in the new Multi-purpose Room.

17. Provide Construction Support for bidding assistance and Construction Administration services Items Not Included
a. Land Survey with underground utility lines (available drawings will be provided by the Client) b. Asbestos, Lead paint, Hazardous Materials Report
c. Design of ADA parking stalls and path-of-travel, as the existing ADA parking stalls and path-of-travel are assumed to be ADA compliant.
d. Design of any part of the exterior sitework.
e. Landscape architecture and Civil Engineering
f. Audio-Visual design (however, BOA will coordinate with your IT Dept. to locate data ports and conduits). g. Furniture selection

Page 298 of 362 ends

1511 Cota Avenue
Long Beach, CA 90813
Telephone: 562-912-7900
Telephone: 310-832-2681
www.boaarchitecture.com
As for our Time Schedule, we expect to submit 90% complete Construction Documents for plancheck within 4 to 5 months from Notice to Proceed. BOA Architecture can begin work immediately. If you have any questions, please do not hesitate to contact me personally at (310) 480-7730 cell.

BOA Architecture
Edward Lok Ng, Architect, LEED AP, President

Page 299 of 362 ends

FIXED FEE PROPOSAL
Architectural-Engineering Services for:

Monterey Park City Council Chamber Renovation
date: Nov. 4, 2025 Construction Cost Estimate: To Be Determined prepared by: BOA, Edward Lok Ng, Architect prepared for: City of Monterey Park, Ziad Mazboudi

PERSON HRS UNIT RATE COST TOTAL

PRE-DESIGN
kick-off meeting to verify scope of work,obtain as-built dwgs. PM-Arch 6 hrs 150 900 project management, confirm cost/work plan & prep field work PM-Arch 6 hrs 150 900 site assessment, as-built measurements & photos Sr.Tech 10 hrs 110 1,100 CADD-3D Sr.Tech 30 hrs 110 3,300
6,200

ARCHITECTURAL SCHEMATIC DESIGN
preliminary design; 3 floor plan options, refine 1 option PM-Arch 16 hrs 150 2,400 CADD-3D drawings Sr.Tech 40 hrs 110 4,400
3-D color renderings Sr.Tech 20 hrs 110 2,200
project management PM-Arch 8 hrs 150 1,200
construction cost estimate PM-Arch 6 hrs 150 900
meeting or coordination with Client PM-Arch 12 hrs 150 1,800 12,900
ENGINEERING and EXPENSES
structural engineering 3,000
mechanical, new HVAC equipment, provide new ducts 7,000 plumbing 0
electrical 9,000
AV consultant 0
acoustical engineering 5,000
civil engineering 0
expenses for blueprints, photocopies, mailing, misc. 200 24,200

ARCHITECTURAL DESIGN DEVELOPMENT & CONSTRUCTION DOCUMENTS refine preliminary design PM-Arch 16 hrs 150 2,400
CADD-3D modeling of construction document drawings Sr.Tech 100 hrs 110 11,000 project management, design development,coord. w engineers PM-Arch 50 hrs 150 7,500 meeting or coordination with Client PM-Arch 20 hrs 150 3,000 specifications in CSI format PM-Arch 30 hrs 150 4,500
construction cost estimate PM-Arch 6 hrs 150 900
quality control PM-Arch 16 hrs 150 2,400
City bldg-safety dept. and client submittal&corrections Sr.Tech 30 hrs 110 3,300 35,000

CONSTRUCTION SUPPORT
pre-bid meeting PM-Arch 4 hrs 150 600
bidding RFI's PM-Arch 6 hrs 150 900
pre-construction meeting PM-Arch 4 hrs 150 600
project management, RFI & submittal response PM-Arch 40 hrs 150 6,000 CADD-3D modeling and record drawings Sr.Tech 10 hrs 110 1,100 construction site meetings, punchlist meeting PM-Arch 10 hrs 150 1,500 10,700
TOTAL $89,000

Page 300 of 362 ends
Page 301 of 362 ends
Page 302 of 362 ends

City Council Staff Report

Date: December 17, 2025
Agenda Item Number: 9.F.

To: The Honorable Mayor and City Council
From: Shawn Igoe, Public Works Director
Subject: Fiber Optic Installation

Recommendation:

It is recommended that the City Council consider:

1. Adopting a Resolution waiving bidding requirements, authorizing the City Manager to enter into an agreement, in a form approved by the City Attorney, with Arcadian Infracom 2, LLC. for the purchase of fiber optic conduits and fiber and related amenities, and authorizing the City Manager or designee to approve change orders not to exceed $35,000 over the total contract amount; and

2. Taking such additional, related, action that may be desirable.

Executive Summary:

Arcadian Infracom 2, LLC (“Arcadian”) is contracted with the State of California to build over 1,000 miles of the California’s Middle Mile Broadband Network. The Middle Mile Broadband Initiative was created in 2021 with the investment of over $3 billion dollars to bridge the digital divide and provide reliable, accessible and affordable internet access to every Californian. This access is used to support tele-health, tele-education, and economic development across the state.

Arcadian’s conduits pass through Monterey Park as part of their larger project from Downtown Los Angeles to Las Vegas. Arcadian’s conduits and fibers are proposed to be installed along Monterey Pass Road and Garvey Avenue. The City has two ongoing projects, Adaptive Traffic and Monterey Pass complete street require installation of fiber optics conduits and fiber at the same locations. Arcadian agreed that it could supply this fiber optic infrastructure for the City.

This would reduce impacts to the public.

The City obtained approval from the Los Angeles County Metropolitan Transportation Authority (“LACMTA”) for using allocated funding for the project to enter into an agreement with Arcadian. The Public Works Director (“Director”) requests City Council approval to enter into an agreement with Arcadian in an amount not to exceed $350,000, plus 10% contingency, for the purchase of conduit, fiber and related amenities (the “Contract”).

Page 303 of 362 ends

Background:

The City is currently designing two major projects using Measure R– SR-710 North Mobility Improvements funds. The projects are the Adaptive/Responsive Traffic Signal Improvement Project along Atlantic Blvd., Garfield Blvd. and Garvey Avenue, and the Monterey Pass Road Complete Street project, from Floral Drive to Garvey Avenue. These two projects include the installation of conduits and fiber for traffic signal communication.

Arcadian is seeking an encroachment permit for its proposed work implementing the Middle Mile Broadband Network (“MMBN”). As part of this project, the California Department of Technology (“CDT”) partnered with Arcadian to construct 306 miles of the state’s open access network through urban and rural areas between Los Angeles and Needles, including Monterey Park. Arcadian was selected as a result of CDT’s 2023 Request for Innovative Ideas (“RFI2”) solicitation for the MMBN solutions. Partnering with Arcadian will reduce financial and construction impacts for the City. Arcadian provided a cost proposal of $350,000 to construct and install all fiber, conduits and ancillaries to meet the City’s needs. This cost was less than half of the Engineer’s estimate for the City’s two proposed projects.

Since the two projects are funded by SR710 funds administered by LACMTA, the Director sought LACMTA approval for funding and LACMTA approved the City’s request.

It is recommended that City Council adopt a Resolution waiving bidding requirements and authorize the City Manager to execute an agreement with Arcadian Infracom 2, LLC in an amount not to exceed $350,000, for the installation of conduits, fibers and ancillaries per Attachment 2, with a contingency not to exceed $35,000. Arcadian’s project is registered with the Department of Industrial Relations (DIR) as Project No. 20250569982. The City also verified its contractor, HP Communications, Inc. is a registered contractor with DIR.

Additionally, Arcadian – and its contractors – are required to pay prevailing wage in accordance with California law.

Strategic Plan Goal:

This Project meets the City’s goal to maintain, build and modernize infrastructure and facilities to support the current and future needs of our City and community as it aims to aims to improve traffic signal communication across the City.

Fiscal Impact:

The proposed contract cost will not exceed $385,000. Funds for this project are budgeted as part of Capital Improvement Project No. 96026 and 96047.

Attachments:

1. Resolution

2. Proposal

Page 304 of 362 ends

Staff Report
December 17, 2025
ATTACHMENT 1
Resolution

Page 305 of 362 ends
Page 1 of 4 ends

RESOLUTION NO. __

A RESOLUTION APPROVING THE DESIGN AND PLANS PURSUANT
TO GOVERNMENT CODE § 830.6, WAIVING CITY BID

REQUIREMENTS, AND AUTHORIZING THE CITY MANAGER TO
EXECUTE AN AGREEMENT WITH ARCADIAN INFRACOM 2, LLC TO

CONSTRUCT CONDUIT AND FIBER NETWORK IMPROVEMENTS

ALONG GARVEY AVE AND MONTEREY PASS ROAD

The City Council of the City of Monterey Park does resolve as follows:

SECTION 1: The City Council finds and declares as follows:

A. The City’s Capital Improvement Plan (“CIP”) includes two projects requiring fiber optic infrastructure: the Adaptive/Responsive Traffic Signal Improvement Project along Atlantic Boulevard, Garfield Boulevard, and Garvey Avenue (CIP# 96026) and the Monterey Pass Road Complete Street project, from Floral Drive to Garvey Avenue (CIP # 96047) (collectively, the “Projects”).

B. The Engineer’s estimate for completing the technology portion of these Projects is $1,700,000. It is anticipated that the Projects would commence construction on or about February 2026.

C. On or about July 2025, Arcadian Infracom 2, LLC (“Arcadian”) filed an application for encroachment permits to commence construction of a conduit and fiber infrastructure project in accordance with California’s Middle Mile Broadband Network (“MMBN”). The MMBN is a statewide initiative and a partnership between the state of California and Arcadian.

D. The City Council wishes to obtain the immunities set forth in Government Code § 830.6 with regard to the plans and construction of the Project .

Arcadian’s plans and specifications for the MMBN conform with the City Engineer’s expectations and preliminary designs for implementing the Projects. The City Engineer reviewed the design and plans prepared by Arcadian and agrees they meet the specifications needed for the Projects.

E. Ordinarily, the City would need to comply with the competitive bidding requirements set forth in the California Public Contracts Code to construct the Projects.

F. The purpose of such bidding requirements is to guard against favoritism, improvidence, extravagance, fraud and corruption, to prevent waste of public funds, and to obtain the best economic result for the public.

G. The facts and circumstances of this Project, however, demonstrate that a competitive bid process performed by the City would be unavailing or would not produce an advantage, and the advertisement for competitive bid would

Page 306 of 362 ends
Page 2 of 4 ends

thus be undesirable and impractical for the following reasons:

1. Arcadian has an existing agreement with the California Department of Technology ( “CDT”) for MMBN solutions . That agreement complies with California law as to prevailing wage, bonding, and other crucial requirements that are part of the City’s standard public works contracts.

2. Arcadian’s MMBN work will be in the same place as contemplated for the Projects. By partnering with Arcadian, the City seeks to minimize impact to the public and complete needed conduit and fiber infrastructure at a reduced cost.

3. Arcadian agreed to construct fiber infrastructure for the City in accordance with its CDT agreement at City’s cost. HP
Communications, Inc. will construct conduit and fiber network on Arcadian’s behalf. As a result, the City will own an extension of fiber infrastructure along Monterey Pass road from Floral Drive to Garvey Avenue to Garvey Avenue and New Ave.

4. CDT and Arcadian are required to comply with competitive bidding requirements that are substantially similar to those governing City’s public works project.

5. It is in the public interest for City to allow Arcadian to complete the Project in accordance with the Architect’s approved plans and specifications.

6. To complete the Project, Arcadian must comply with payment of prevailing wages in accordance with the California Labor Code.

H. In waiving the competitive bid requirements otherwise required by the Monterey Park Municipal Code and Public Contracts Code, the City Council takes note of the analysis and decisions set forth in Graydon v.

Pasadena Redevelopment Agency (1980) 104 Cal.App.3d 631; Hodgeman v. City of San Diego (1942) 53 Cal. App.2
nd 610; Orange County Water
Dist. v. Bennett (1958) 156 Cal. App.2 nd 745; and Los Angeles G&E Corp. v. City of Los Angeles (1922) 188 Cal. 307.

SECTION 2: Environmental Assessment . The Projects, including Arcadian’s infrastructure construction and installation, are categorically exempt from the requirements of the California Environmental Quality Act (CEQA) pursuant to 14 California Code of Regulations § 15301 as a Class 1 categorical exemption (Existing Facilities). The project results in minor alterations to existing public facilities involving no significant expansion of the existing use. The Projects are not anticipated to have any significant impacts with regard to traffic, noise, air quality, or water quality. There are adequate utilities and public services to serve the Projects.

Page 307 of 362 ends
Page 3 of 4 ends

SECTION 3: Action. The City Council waives the bidding requirements for the Projects, authorizes the City Manager to enter into an agreement, in a form approved by the City Attorney, with Arcadian Infracom 2, LLC for the construction fiber optic conduits and fiber and related amenities , and authorizes the authorizes the City Manager, or designee, to approve change orders not to exceed $35,000 over the total contract amount.

SECTION 4: Design Immunity; Authorization.

A. The design and plans for the Projects are determined to be consistent with the City’s standards and are approved.

B. The design approval set forth in this Resolution occurred before actual work on the Projects’ construction commenced.

C. The approval granted by this Resolution conforms to the City’s General Plan.

D. The City Engineer, or designee, is authorized to act on the City’s behalf in approving any alterations or modifications of the design and plans approved by this Resolution.

E. The approval and authorization granted by this Resolution is intended to avail the City of the immunities set forth in Government Code § 830.6.

SECTION 5: Severability. If any part of this Resolution or its application is deemed invalid by a court of competent jurisdiction, the City Council intends that such invalidity will not affect the effectiveness of the remaining provisions or applications and, to this end, the provisions of this Resolution are severable.

SECTION 6: Reliance On Record. Each and every one of the findings and determinations in this Resolution are based on the competent and substantial evidence, both oral and written, contained in the entire record relating to the project. The findings and determinations constitute the independent findings and determinations of the City Council in all respects and are fully and completely supported by substantial evidence in the record as a whole.

SECTION 7: Limitations. The City Council’s analysis and evaluation of the project is based on the best information currently available. It is inevitable that in evaluating a project that absolute and perfect knowledge of all possible aspects of the project will not exist. One of the major limitations on analysis of the project is the City Council’s lack of knowledge of future events. In all instances, best efforts were made to form accurate assumptions. Somewhat related to this are the limitations on the City’s ability to solve what are in effect regional, state, and national problems and issues. The City must work within the political framework within which it exists and with the limitations inherent in that framework.

Page 308 of 362 ends
Page 4 of 4 ends

SECTION 8: Construction. This Resolution must be broadly construed in order to achieve the purposes stated in this Resolution. It is the City Council’s intent that the provisions of this Resolution be interpreted or implemented by the City and others in a manner that facilitates the purposes set forth in this Resolution.

SECTION 9: Electronic Signatures . This Resolution may be executed with electronic signatures in accordance with Government Code §16.5. Such electronic signatures will be treated in all respects as having the same effect as an original signature.

SECTION 10:

The Mayor, or presiding officer, is authorized to affix their signature to this Resolution signifying its adoption by the City Council.

SECTION 11: The City Clerk is directed to certify the adoption of this Resolution.

SECTION 12:

This Resolution will become effective immediately upon adoption.

PASSED AND ADOPTED this ___ day of ______________, 2025.

________________________________
Elizabeth Yang, Mayor
ATTEST:

_____________________________
Maychelle Yee, City Clerk

APPROVED AS TO FORM:

KARL H. BERGER, CITY ATTORNEY

By:____________________________
Justin A. Tamayo, Assistant City Attorney

Page 309 of 362 ends

Staff Report
December 17, 2025
ATTACHMENT 2
Arcadian Infracom 2, LLC.

Proposal

Page 310 of 362 ends

Investor Model
Key Data
Conduit & Fiber
Construction
Proposal for
The City of Monterey
Park, CA
Primary Route
Backbone
This Proposal is confidential and private. Distribution is restricted.

It may not be reproduced, copied or replicated in any form without the express and written authorization of Arcadian Infracom.

December 1, 2025

Page 311 of 362 ends

Introduction
Arcadian Infracom is pleased to submit a budgetary proposal to The City of Monterey Park for conduit and fiber construction in the City of Monterey Park, CA. Founded in 2018, Arcadian develops, builds and operates lower-latency critical digital infrastructure with an experienced team that leverages ultra-efficient processes tailored to meet the growing demands of our valued customers.

Arcadian’s Roadrunner Route provides a new terrestrial path from Los Angeles to Phoenix. It provides its clients with a uniquely diverse, high-capacity fiber route built for growth and architectural resilience.

This proposal presents an extension to the existing Arcadian build within Monterey Park. With acceptance of this proposal, Monterey Park will be able to establish a fiber optic backbone along Monterey Pass Blvd and Garvey Ave through the City. This backbone will be the basis for other lateral connections and fiber optic needs of the City.

Page 312 of 362 ends

Route Overview and Pricing
3 Monterey Park Backbone Build Overview and Pricing
 Extension of Arcadian build for Monterey Park from Monterey Pass Blvd. and Floral Drive to Garvey Ave and New Street.
 32 Metro hand holes (24”X36”) placed at 32 separate locations for city use only.  One-Time Special Construction fee required for all new build portions of the route, access point placement, and splicing fees. Fee will be paid by City of Monterey Park upon completion and delivery of the network.  Route completion projected 1Q26
 1 x 4-way 18/14 FuturePath conduit and 1 x Corning 144 count fiber  Required Permits:
 (1) City of Monterey Park Permit
 Total Cost to Monterey Park: $350,000
Blue line indicates original joint build, arrows point out proposed lateral extensions

Page 313 of 362 ends

Terms
TERMS
 This pricing proposal is confidential and proprietary and subject to an NDA between the parties.  Final pricing, terms, and fiber routes will be included in a definitive agreement and Order(s) executed under it.  Orders for service will be governed by the agreement between the customer and Arcadian.  Pricing and Terms are based on stated routes, volume, and commitment to pay all fees for entire IRU Term.  The non-recurring charges are estimates and subject to final pricing.  Pricing is based on purchase of all quoted routes and facilities.  This pricing proposal is valid until 12/31/2025.
 All fiber and conduit obtained under IRU is for Customer's internal use only. Customer is expressly prohibited from reselling, sub-IRU, or leasing the fiber/Conduit IRU or any portion thereof to a third party.  Customer access points will be identified and agreed to by both parties as part of the IRU order.

Page 314 of 362 ends

City Council Staff Report

Date: December 17, 2025
Agenda Item Number: 9.G.

To: The Honorable Mayor and City Council
From: Shawn Igoe, Public Works Director
Subject: 2025-26 Street Rehabilitation at Various Locations – Award of Public Works Contract to Onyx Paving Company, Inc.

Recommendation:

It is recommended that the City Council consider:

1. Authorizing the City Manager to execute a public works contract, in a form approved by the City Attorney, with Onyx Paving Company, Inc., in the contract amount of $3,936,000 for the 2025-26 Street Overlay at Various Locations project;

2. Authorizing the Public Works Director to approve change orders not to exceed $590,400 over the total contract amount;

3. Authorizing an appropriation of $425,000 from Fund 601, Street Bond to Fiscal Year 2025-26 Budget; and

4. Taking such additional, related, action that may be desirable.

CEQA (California Environmental Quality Act):

The City reviewed the environmental impacts of the proposed Ordinance pursuant to the California Environmental Quality Act (Public Resources Code §§ 21000, et seq. “CEQA”) and the regulations promulgated thereunder (14 Cal. Code of Regs. §§ 15000, et seq., the “CEQA Guidelines”). CEQA Guideline § 15301(c) (Existing Facilities) exempts the operation, repair, maintenance, alteration of existing public or private structures which involve negligible or no expansion of existing or former use. The proposed work will occur entirely within an existing structure. Accordingly, no further environmental review is required.

Executive Summary:

Capital Improvement Project (“CIP”) No. 96057 – 2025-26 Street Rehabilitation at Various Locations (the “Project”) includes the application of Asphalt Rubber Hot Mix and AC Overlay.

Pursuant to Resolution No. 2025-R58, the Public Works Director solicited bids for the 2025-26 Street Rehabilitation at Various Locations (Specification No. 2025-010).

The public bid opening for the 2025-26 Street Rehabilitation was held on November 18, 2025.

Eight companies submitted bids: All American Asphalt, Onyx Paving Company, Hardy & Harper, Gentry Brothers, Vance Corporation, Calmex Engineering, Sequel Contractors, Excel Paving. It is recommended that City Council authorize the City Manager to execute a Public

Page 315 of 362 ends

Works contract with Onyx Paving Company, the lowest responsible bidder, for the 2025-26 Street Rehabilitation at various locations, plus a contingency amount not to exceed $590,400.

Background:

The 2025-26 Capital Improvement Program includes the Project as Project No. 96057 to be funded by SB1, Measure M, Gas Tax, Street Bonds, Development Impact Fees-Circulation and General Fund. The project includes cold mill of existing road and overlay using AC Mix and Asphalt Rubber Hot Mix. The project involves the overlay of the following streets:

STREET SEGMENT No.

Street From To
1 Brockwell Ave Elmgate St Grandridge Ave
2 Cliffhill Dr Isabella Ave Isabella Ave
3 Doncrest St Isabella Ave Fernbank Ave
4 Doncrest St Fernbank Ave Elmgate St
5 Elmgate St Almora St Grandridge Ave
6 Elmgate St Grandridge Ave Brockwell Ave
7 Elmgate St Brockwell Ave Graylock Ave
8 Elmgate St Graylock Ave Fernbank Ave
9 Elmgate St Fernbank Ave Isabella Ave
10 Elmgate St Isabella Ave Garfield Ave
11 Ferbank Ave Elmgate St Isabella Ave
12 Floral Dr Graylock Ave Isabella Ave
13 Floral Dr Isabella Ave Garfield Ave
14 Garfield Ave Coral View St El Repetto Dr
15 Garfield Pl Elmgate St End
16 Garfield Pl Garfield Ave Garfield Pl
17 Grandridge Ave Mcpherrin Ave Elmgate St
18 Grandridge Ave Elmgate St Andrix St
19 Grandridge Ave Andrix St Brockwell Ave
20 Grandridge Ave Brockwell Ave Floral Dr
21 Graylock Ave Doncrest St Elmgate St
22 Graylock Ave Elmgate St Floral Dr
23 Isabella Ave El Repetto Dr Cliffhill Dr
24 Isabella Ave Cliffhill Dr Elmgate St
25 Isabella Ave Elmgate St Floral Dr
26 Isabella Ave Floral Dr Riggin St
27 Grandridge Ave El Repetto Dr Cielito Ave
28 Grandridge Ave Cielito Ave McPherrin Ave
29 Grandridge Ave Grandridge Ave Bradshawe Ave
30 Loma Verde St El Repetto Dr Pluma Wy
31 Loma Verde St Pluma Wy Brightwood St

Page 316 of 362 ends

32 McPherrin Ave Bradshawe Ave Brightwood St
33 McPherrin Ave Brightwood St Grandridge Ave
34 McPherrin Ave Grandridge Ave 775' NE/
Grandridge Ave
35 McPherrin Ave 775' NE/ Grandridge
Ave
Cul-De-Sac
36 Brockwell Ave Doncrest St Elmgate St
37 Fernback Ave Doncrest St Elmgate St
38 Mira Valle St El Repetto Dr Cielito Ave
39 Pavo Real Ave El Repetto Dr Grandridge Ave
40 Pavo Real Ave McPherrin Ave End
41 Ynez Ave Adobe Pl El Repetto Dr
42 Cielito Ave Grandridge Ave Bradshawe Ave
42 Cielito Ave Bradshawe Ave Mira Valle St
43 Garfield Graves Ave Coral View Ave

ALLEY SEGMENT No.

Street From To
1 Alley E/Garfield
Ave
Andrix St Elmgate St
2 Alley E/Garfield
Ave
Elmgate St Wilcox Ave
3 Alley N/Pomona
Blvd
Ferdinand Ave Via Norte Ave
4 Alley N/Pomona
Blvd
Isabella Ave Ferdinand Ave
5 Alley E/Isabella
Ave
Pomona Blvd Fernfield Dr
6 W/O Atlantic Blvd Harding Ave El Portal Pl
7 W/O Atlantic Blvd Cadiz St El Portal Pl
8 E/O Atlantic Blvd El Mercado Ave El Portal Pl
9 E/O Atlantic Blvd Cadiz St Loma Verde St
10 W/O Collegian Ave Collegian Ave Dorner Dr
11 N/O W Riggin St Gerhart Ave S Bradshawe Ave
12 N/O W Riggin St S Bradshawe Ave Hendricks Ave
13 N/O W Riggin St Hendricks Ave Findlay Ave
14 N/O W Riggin St Findlay Ave Ferdinand Ave

The public works bid was opened on November 18, 2025, and includes the following bids:

RANK BIDDER BASE BID AMOUNT
1 Onyx Paving Company $ 3,936,000.00
2 Hardy & Harper $ 3,940,000.00
3 All American Asphalt $ 3,968,114.00

Page 317 of 362 ends

4 Gentry Brothers, Inc $ 3,997,292.65
5 Vance Corporation $ 4,015,355.25
6 Calmex Engineer, Inc $ 4,169,443.00
7 Sequel Contractors, Inc $ 4,240,181.56
8 Excel Paving Company $ 4,359,583.36

The bid submitted by Onyx Paving Company, Inc. is the lowest proposal received out of the eight contractors. Onyx Paving Company, Inc’s contractor's license was verified with the California State Contractor’s License Board to be current, active and in good standing.

Registration with the California Department of Industrial Relations (DIR) was verified. The Director is familiar with Onyx Paving Company, Inc.'s work, and there is only positive feedback from the City's field crew and office staff. They are currently providing services to the City.

It is recommended that the City Council awards the project to Onyx Paving Company, Inc. for a total of $3,936,000 with a contingency not to exceed $590,400.

Strategic Plan Goal:

The road overlay project supports the City’s goal to maintain City facilities to support the current and future needs of our City and community.

Fiscal Impact:

An appropriation of $425,000 from Fund 601, Street Bond to Fiscal Year 2025-26 Budget is requested. All other funds for the proposed project are budgeted in the 2025-2026 Fiscal Year Capital Improvement Program under CIP 96057, funded by Fund 237 – SB1, Fund 240 – Measure M, Fund 242 – Gas Tax, Fund 601 Street Bonds, Fund 204 - Development Impact Fees-Circulation and Fund 101- General Fund.

CIP 96057 – 2024-25 Street Overlay at
Various Locations Project
Street Overlay
(Onyx Paving Company, Inc.)
$3,936,000
Contingency (not to exceed) $590,400
Construction
management/Construction
Inspection
$10,000
Geotechnical testing $20,000
Total Estimated Project Cost $4,556,400

Attachments:

1. Bid Schedule

Page 318 of 362 ends

ATTACHMENT 1
Onyx Paving Company, Inc.

Bid Schedule
2025-26 Street Rehabilitation at Various Locations Project Staff Report
December 17, 2025

Page 319 of 362 ends
Page 320 of 362 ends
Page 321 of 362 ends

City Council Staff Report

Date: December 17, 2025
Agenda Item Number: 9.H.

To: The Honorable Mayor and City Council
From: Shawn Igoe, Public Works Director
Subject: 2025 Curb Ramp Improvements – Award of Public Works Contract to CJ Concrete Construction, Inc.

Recommendation:

It is recommended that the City Council consider:

1. Authorizing the City Manager to execute a public works contract, in a form approved by the City Attorney, with CJ Concrete Construction in the contract amount of $181,745 for the 2025 Curb Ramp Improvements Project;

2. Authorizing the Public Works Director to approve change orders not to exceed $18,175 over the total contract amount; and

3. Taking such additional, related, action that may be desirable.

CEQA (California Environmental Quality Act):

The City reviewed the environmental impacts of the proposed Ordinance pursuant to the California Environmental Quality Act (Public Resources Code §§ 21000, et seq. “CEQA”) and the regulations promulgated thereunder (14 Cal. Code of Regs. §§ 15000, et seq., the “CEQA Guidelines”). CEQA Guideline § 15301(c) (Existing Facilities) exempts the operation, repair, maintenance, alteration of existing public or private structures which involve negligible or no expansion of existing or former use. The proposed work will occur entirely within an existing structure. Accordingly, no further environmental review is required.

Executive Summary:

Capital Improvement Project (“CIP”) No. 96048 – 2025 Curb Ramp Improvements Project includes curb ramp construction at various street intersections. Pursuant to Resolution No. 2025-R58, the Public Works Director solicited bids for the 2025 Curb Ramp Improvements (Specification No. 2025-005).

The public bid opening for the 2025 Curb Ramp Improvements project was held on November 18, 2025. Eight bids were received: CJ Concrete Construction, Onyx, CT&T, Kalban, Calmex Engineering, FS Contractors, Hardy & Harper, and Toro Enterprises. As required by the U.S.

Department of Housing and Urban Development (HUD) for the use of Community Development Block Grant (CDBG) funds, staff held a pre-bid meeting which was attended by 9 potential bidders, including CJ Concrete Construction, Inc. It is recommended that the City

Page 322 of 362 ends

Council authorize the City Manager to execute a Public Works contract with CJ Concrete Construction, the lowest responsible bidder, for the 2025 Curb Ramp Improvements project in the amount of $181,745, plus a contingency amount not to exceed $18,175.

Background:

The proposed work includes the reconstruction of twenty-nine (29) existing curb ramps in order to meet current ADA standards.

The public works bid was opened on November 18, 2025, and includes the following bids:

RANK BIDDER BASE BID AMOUNT
1 CJ Concrete Construction $ 181,745.00
2 Onyx Paving Company $ 182,000.00
3 CT&T Concrete Paving $ 195,410.00
4 Kalban $ 198,500.00
5 Calmex Engineering $ 198,906.00
6 FS Contractors $ 210,000.00
7 Hardy & Harper $ 245,480.00
8 Toro Enterprises $ 247,875.00

The bid submitted by CJ Concrete Construction, Inc. is the lowest responsive bid from a responsible bidder. CJ Concrete Construction contractor's license was verified with the California State Contractor’s License Board to be current, active, and in good standing.

Registration with the California Department of Industrial Relations (DIR) was verified. Staff also checked the contractor’s references and received positive feedback. Additionally, the contractor submitted all documents and met federal requirements.

It is recommended that the City Council awards the project to CJ Concrete Construction, Inc. for a total of $181,745.

Strategic Plan Goal:

The curb ramps reconstruction project supports the City’s goal to maintain City facilities to support the current and future needs of our City and community.

Fiscal Impact:

The proposed project is budgeted in the 2025-2026 Fiscal Year Capital Improvement Program under CIP 96048 funded by CDBG funds. There are sufficient funds to award the contract.

CIP 96048 – Curb Ramp Improvements Project
Curb Ramp Improvements
(Onyx Paving Company, Inc)
$181,745.00
Contingency (not to exceed) $18,174.50
Construction management/Construction
Inspection
$10,000.00
Labor compliance $8,840.00
Total Estimated Project Cost $218,759.00

Page 323 of 362 ends

Attachments:

1. Bid Schedule

Page 324 of 362 ends

ATTACHMENT 1
CJ Concrete Construction, Inc.

Bid Schedule
2025 Curb Ramp Improvements
Staff Report
December 17, 2025

Page 325 of 362 ends

6,000.00 174,000.00
500.00 500.00
174,500.00

ONE HUNDRED SEVENTY-FOUR THOUSAND FIVE HUNDRED DOLLARS AND ZERO CENTS

Page 326 of 362 ends

City Council Staff Report

Date: December 17, 2025
Agenda Item Number: 9.I.

To: The Honorable Mayor and City Council
From: Shawn Igoe, Public Works Director
Subject: Title VI Metro Plan Update

Recommendation:

It is recommended that the City Council consider:

1. Approving the Title VI of the Civil Rights Act of 1964 (Title VI) Program Update;

2. Authorizing the City Manager or designee to submit the Title VI Program Update to the Los Angeles County Metro Office of Civil Rights and Federal Transit Administration (FTA); and

3. Taking such additional, related, action that may be desirable.

Executive Summary:

The Title VI of the Civil Rights Act of 1964 (Title VI) prohibits discrimination on the basis of race, color, and national origin in programs or activities that receive federal funding. The Federal Transportation Administration (FTA) requires agencies that receive their grant funds to demonstrate compliance with Title VI by submitting a Title VI Program Update every three years. The City Council last approved the Title VI Program in 2022. The Director of Public Works (“Director”) recommends City Council approve the City’s Title VI program update for continued compliance with FTA requirements as a sub-recipient of Los Angeles County Metro for pass-through funds. Failure to submit a Title VI Program Update could make the City ineligible for federal funding and result in loss of federal financial assistance.

Background:

As a recipient of federal funding, the City is required to comply with Title VI civil rights regulations.

Title VI of the Civil Rights Act of 1964 states the following:

"No person in the United States shall, on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance."

Page 327 of 362 ends

The Title VI Program Update document consists of a plan and supporting documentation that provides evidence of the equitable distribution of services; promotion of full and fair participation in public transportation decision-making without regard to race, color, or national origin, and meaningful access to transit-related programs and activities by persons with limited English proficiency. FTA reviews and approves the Title VI Program Update or may request additional information. Failure to submit a Title VI Program Update or have a Title VI Program Update approved by the FTA could result in the loss of Federal funding.

The Title VI Program Update report must incorporate the following requirements set forth in the FTA Circular 4702.1B:

1. A notice to the public that indicates the City is compliant with Title VI, and informs members of the public of the protections against discrimination afforded to them by Title VI;

2. Complaint procedures and complaint form(s) made available to members of the public to file a Title VI discrimination complaint;

3. A list of all transit-related complaints, investigations, or lawsuits filed within the last program cycle;

4. A Public Participation Plan;

5. A Language Assistance Plan for persons with limited English Proficiency;

6. A racial breakdown of transit-related planning and advisory committees;

7. Assistance to and monitoring of sub-recipients;

8. Equity evaluations relating to the site and location of facilities;

9. Service standards and system-wide service policies;

10. Collection and reporting of demographic data; and

11. Monitoring of transit service

City Council must approve the proposed Title VI Program Update report before submission to Los Angeles County Metro Office of Civil Rights and the FTA. A copy of the meeting minutes will be submitted to the FTA as evidence of its approval.

Strategic Plan Goal:

N/A

Fiscal Impact:

The City previously received FTA grant funds as a subrecipient of Los Angeles County Metro for the replacement of transit buses, and bus stop improvements including funding for the construction of the Transit Center at East Los Angeles Community College. These assets are still in service, and the City must continue to comply with FTA funding requirements, by adopting the Title VI Program update every three years.

Attachments:

1. Title VI Program Update

Page 328 of 362 ends

Staff Report
December 17, 2025
ATTACHMENT 1
Title VI Program Update

Page 329 of 362 ends

Pride in the Past • Faith in the Future

CITY OF MONTEREY PARK

320 West Newmark Avenue • Monterey Park • California 91754-2896 www.ci.monterey-park.ca.us

City Council
Henry Lo
Vinh Ngo
Jose Sanchez
Thomas Wong
Elizabeth Yang

City Clerk
Maychelle Yee

City Treasurer
Amy Lee

CITY OF MONTEREY PARK

TITLE VI PROGRAM UPDATE
EFFECTIVE DECEMBER 17, 2025

Page 330 of 362 ends

Title VI Program Update 2025 Page 1 of 13

TABLE OF CONTENTS
Page
I. Introduction

1. Annual Title VI Certification ....................................................................................... 2

2. Notification of Beneficiaries ...................................................................................... 2

3. Title VI Complaint Procedure ..................................................................................... 2

4. Recording Title VI Investigations, Complaints, and Lawsuits .................................... 3

5. Membership of Non-Elected Committees and Councils ........................................... 4

6. City Council Resolution Approving Updated Title VI Program .................................. 5

II. INCLUSIVE PUBLIC PARTICIPATION

1. Public Outreach Efforts .............................................................................................. 5

2. Incorporating Environmental Justice into Planning .................................................. 6

3. Outreach Efforts ......................................................................................................... 6

III. LANGUAGE ASSISTANCE PLAN

1. Improving Access for People with Limited English Proficiency (LEP) ........................ 7

2. Four Factor Analysis ................................................................................................... 7

3. Language Assistance Measures ................................................................................. 9

4. Training Staff ............................................................................................................ 10

5. Providing Notice to LEP Persons .............................................................................. 10

6. Monitoring and Updating the LEP Plan ................................................................... 10

IV. SERVICE POLICIES AND STANDARDS

1. Vehicle Assignments/Age of Vehicles ...................................................................... 10

2. Vehicle Load ............................................................................................................. 11

3. Vehicle Headways (Frequencies) ............................................................................. 11

4. On-Time Performance ............................................................................................. 11

5. Transit Access ........................................................................................................... 11

6. Distribution of Transit Amenities ............................................................................. 12

7. Monitoring Service Standards ................................................................................. 12

V. OTHER PROGRAM SPECIFIC REQUIREMENTS .................................................................. 12

APPENDICES
A. Title VI Notification
B. Complaint Procedure
C. Complaint Form
D. Administrative Policy No. 10-35

Page 331 of 362 ends

Title VI Program Update 2025 Page 2 of 13
I. INTRODUCTION

1. Annual Title VI Certifications and Assurances In accordance with 49 CFR Section 21.7(a).

The City of Monterey Park (City) will submit an annual Title VI assurance and a triennial Title VI Program Update to the Los Angeles County Metropolitan Transportation Authority (MTA). MTA is the City's pass-through agent for Federal Transit Administration (FTA) grant funds that the City is awarded to replace transit vehicles and to make improvements at bus stops.

The City operates a fixed -route service - Spirit Bus - and a demand responsive service - Dial-A- Ride. In April 2025, the City launched a pilot program for micro transit service. The three services operate generally within City limits. The City contracts with a private company to operate the Spirit Bus; the service is available to the general public for a cash fare of 25 cents for Routes 1 to 3 and 50 cents for Route 5 and the Metrolink feeder service. Dial-A-Ride is operated in -house and is restricted to senior residents who are 55 years and older and individuals with disabilities.

Dial-A-Ride is a free service. MPK Transit Express, operated by Via Transportation, Inc. is available for one-way rides for $2 per ride, and $1 for seniors and people with disabilities.

2. Notification of Beneficiaries of Protection under Title VI

In compliance with 49 CFR Section 21.9 (d), the City provides information to the public regarding its Title VI obligations and apprises members of the public of the protection against discrimination afforded to them by Title VI. This statement of nondiscrimination on the basis of race, color, and national origin is available on the City’s website and on notices posted in City - owned service vehicles and City Hall.

The notice also includes contact information for requesting details on the City’s Title VI obligations and the complaint procedure. The notice is in English, Chinese and Spanish.

3. Title VI Complaint Procedure

In order to comply with 49 CFR Section 21.9 (b), the City will follow a complaint procedure in the event that any person believes that he or she, individually, or as a member of any specific class of persons, has been excluded from participation in, been denied the benefits of, or been subjected to discrimination on the basis of race, color, or national origin with regard to:

• the availability and equitable distribution of transit services and benefits; • the level and quality of transit services that are sufficient to provide equal access and mobility for all persons;
• the opportunity to participate in the transit planning and decision making processes; and
• the right to fair decisions on the location of transit services and facilities.

Procedure

Page 332 of 362 ends

Title VI Program Update 2025 Page 3 of 13
The complaint will be made in writing to the Director of Public Works and will include all information relevant to a determination of discrimination. A complaint must be filed within six (6) months after the alleged discrimination. In cases where the complainant is unable or incapable of providing a written statement, City staff will assist the person in converting verbal complaints to writing. The complainant or his/her representative must sign all complaints.

After reviewing the complaint, which may include interviewing all appropriate personnel and the complainant and review of City policies and service standards, the Director of Public Works will make a determination. If it is found that discrimination did not occur, the complainant will be notified in writing and the procedure will be terminated. Notification will occur within ten (10) days of the original submission of the complaint. At that time, the complainant will be advised of their right to challenge the decision of the Director of Public Works by submitting a written request for a hearing before the City Manager within five (5) days of the receipt of the determination.

If, after the Director of Public Works' review of the complaint, it is found that discrimination may have occurred, a formal hearing will be held before the City Manager. The claimant will be notified of this determination within ten (10) days of the submission of the complaint. The hearing will occur within five (5) days and will be attended by the Director of Public Works , the City Manager, the complainant and the appropriate personnel. Following the hearing, the City Manager will make a final determination. The complainant will be notified of this determination in writing within ten (10) days of the hearing. If justified, appropriate remedial action will be taken.

If the complainant is not satisfied with the City's decision, the Director of Public Works will advise him/her of their right to submit their complaint to the FTA for further investigation.

Complaint procedure and form s are available in English, Chinese and Spanish on the City's website at https://www.montereypark.ca.gov/1652/ADATitle-VI-Policy. Complaint information is also available at City Hall upon request.

4. Recording Title VI Investigations, Complaints, and Lawsuits

In order to comply with 49 CFR Section 21.9 (b) the City maintains a list of any active investigations, lawsuits, or complaints naming the City and/or its subcontractor(s) that allege discrimination on the basis of race, color, or national origin.

To date there has been no complaint.

Page 333 of 362 ends

Title VI Program Update 2025 Page 4 of 13
Title VI Investigations, Complaints and Lawsuits Log
Number
Date of
Filing
Type of
Complaint
Summary of
Complaint Status Determination
Remedial
Action

5. Membership of Non-Elected Committees and Councils

The City of Monterey Park was incorporated on May 29, 1916 . It is a general law city as defined by the California Government Code. It operates under the Council-Manager form of government.

The City Council is elected at large for four-year, overlapping terms.

Three commissions may make decisions that affect the City's transit service: Planning Commission, Traffic Commission, and Environmental Commission . The Planning Commission is a legislative body consisting of five members who advise the Council on policies and legislation relating to the regulation of growth, development, and environmental conditions affecting the City. The Commission investigates and makes recommendations on zone changes, specific plan revisions, subdivision maps, and decides on zone variances and conditional use permits, subject to appeal to the City Council.

The Traffic Commission reviews traffic issues and recommends any needed changes. Issues range from traffic safety matters to parking restrictions that may be the result of a citizen's request or a staff recommendation. The Commission also makes recommendations to the City Council for installation of stop signs and amendments to the Monterey Park Municipal Code (MPMC) for traffic related items that may ease traffic congestion and help facilitate transportation throughout the City.

The Environmental Commission promotes the preservation of natural resources and the sustainability of the community. The Commission's responsibilities include serving in advisory capacity to the City C ouncil on related issues , assisting in issues that are deemed necessary for the environmental integrity of the city , and advocating and promoting programs to increase awareness of the environment.

While the City Council members are elected officials, Commissioners are appointed. Each of the five City Council members appoints a member to the Planning Commission , a member to the Traffic Commission and a member to the Environmental Commission . There are a total of five members at each commission. The make-up of the Commissions ha s historically been reflective of the City’s diverse community.

The City Council selects members to sit on the Planning Commission based on their knowledge of zone changes, specific plan revisions, subdivision maps, and zone variances and conditional use permits. The Traffic Commissioners should be familiar with issues that range from traffic safety matters to parking restrictions.

Page 334 of 362 ends

Title VI Program Update 2025 Page 5 of 13

Criteria for the selection of members of the Environmental Commission include knowledge o f environmental issues to include water and air quality, natural resources and sustainability.

Body Caucasian Latino African
American
Asian
American
Native
American
Planning
Commission 1 4
Traffic
Commission 1 2 2
Environmental
Commission
2 2

6. City Council Resolution Approving Updated Title VI Program

At the December 17, 2025 City Council meeting, the Monterey Park City Council approved this updated Title VI Program.

II. INCLUSIVE PUBLIC PARTICIPATION

The City of Monterey Park’s public participation strategy includes a variety of communication mechanisms to ensure that all constituents have an opportunity to participate in service development and changes.

1. Public Outreach Efforts

Public participation will be engaged in all areas related to the Spirit Bus service including , but not limited to, service change, publicity and promotions, temporary changes (e.g., detours, special service), and fare media.

Depending on the type of service change that is contemplated , a variety of means are employed to encourage public participation. The measures taken are targeted to overcome linguistic, institutional, cultural, economic, historical, or other barriers that may prevent minority and low- income populations, persons with disabilities and persons with limited English proficiency from effectively participating in the decision-making process.

Any proposal for service change is advertised in the City newsletter, Cascades, which is distributed to every household and business in the City. Featured Stories in the Cascades are translated into both Spanish and Chinese languages. The Cascades is also available o n the City's website. Further outreach is a press release that may include mainstream newspapers, Chinese newspapers, Spanish newspapers and all elected officials who represent constituents who live within the City of Monterey Park. The potential for a change/enhancement to service/fares is a result of carefully evaluated data by appropriate staff.

Page 335 of 362 ends

Title VI Program Update 2025 Page 6 of 13
The proposal will be placed on the agenda for Commissions’ review and discussion. Once public feedback has been collected, the proposal will proceed for City Council consideration. The City Council will make their decision based on public comments, Commission recommendations, and staff evaluation.

Public meetings will be held in facilities that are in compliance with American with Disabilities Act (ADA) standards. Most meetings will be scheduled at the City Hall. However, if funding allows for multiple meetings, geographically-diverse locations will be selected for venues. Meetings are scheduled in the early evening s or weekends and may be conducted remotely to accommodate working schedules.

The outreach will target low income individuals who may have limited access to transportation and the news media. Flyers and notices will be posted at City Hall, the Langley Senior Center and the Bruggemeyer Library where free or discounted services are made available. Flyers will also be posted on City buses to target riders. The City's monthly newsletter is mailed free of charge to every household.

Also, if financial condition permits, translators will be provided at the meetings. At a minimum, Chinese and Spanish translations will be provided. Efforts will be made to provide Vietnamese translators.

2. Incorporating Environmental Justice into Outreach and Planning

Environmental justice practices are incorporated into all City planning and outreach efforts .

Specific steps will be followed when conducting a transit service change, planning study or construction project:

• Compilation of population characteristics and identification of locations with populations of concern for environmental justice;
• Conducting public outreach;
• Identifying adverse effects on populations of concern; and, • Evaluating the project’s overall effects.

3. Outreach Efforts

In 2022, t he City held three community engagement sessions and distributed a community and student survey. The City promoted public participation for its evaluation of its fixed -route transit program. Outreach was conducted through social media, City website, and additional distribution through local schools. Additionally, flyers were posted at various City facilities and buses. The public was also encouraged to participate and voice their comments regarding transit services and areas of improvement at public meetings.

Based on community feedback received through survey research and community engagement and analysis of existing Spirit Bus services, key service design issues were identified. Such issues

Page 336 of 362 ends

Title VI Program Update 2025 Page 7 of 13
include the need to simplify or redesign routes that are presently one-way loops which can result in “out of direction travel.” Also important is addressing connectivity to key trip attractors/generators that did not exist when the Spirit bus routes were first designed in the 1990’s.

On June 18, 2024, staff provided City Council results of the Spirit Bus evaluation completed by Arcadis-IBI, including recommended service improvement strategies. The service improvement strategies included changes to the fixed -route service and implementation of on -demand zones for micro transit services through a pilot program . A follow -up online community survey was released to gain feedback on the proposed program changes. The survey was introduced at the City’s Business Expo event held on August 8 , 2024 , and distributed to local school districts, shared through social media, Cascades, City website, posted at City facilities and Spirit buses.

On November 6, 2024, City Council approved the following route changes and a one -year pilot micro transit program:

• Route 1: Linear bi-direction route along Atlantic Blvd.

• Route 2: Linear bi-direction route along Garfield Ave.

• Route 3: Eliminate service south of Graves to Garvey Ranch and extend route west to Atlantic Blvd.

• Route 4: Eliminate route

• Route 5: Expand service to connect to the Metro E Line Station at Atlantic and Pomona and eliminate service east of Atlantic and Riggin.

Outreach efforts for the micro transit pilot program were shared through social media, City website, and flyers were posted at City facilities. Monthly articles are published in Cascades promoting the service and how to use it.

III. LANGUAGE ASSISTANCE PLAN

1. Improving Access for People with Limited English Proficiency (LEP)

Recognizing the remarkable diversity of its constituents, the City Council adopted the Multi - lingual City Services policy to better serve the community. The Administrative Policy was the product of a multi -lingual task force that was formed as a sub -committee of the Community Relations Committee. The policy is available in Appendix D.

The City’s Language Assistance Plan incorporates all reasonable steps to ensure access to transportation services for LEP individuals.

Page 337 of 362 ends

Title VI Program Update 2025 Page 8 of 13
The plan has the following key elements:
• Identification of LEP individuals who need language assistance in the City using the four-factor analysis;
• Determination of the appropriate language assistance measures; • Training employees on LEP policies and procedures;
• Notification to LEP persons of the language services offered by the City; and • Procedures to monitor and update the Language Assistance Plan.

2. Four Factor Analysis

The Four Factor Analysis considers:

1. The number or proportion of LEP persons eligible to be served or likely to be served by the Spirit Bus System;

2. The frequency with which LEP persons come into contact with the Spirit Bus service;

3. The nature and importance of the Spirit Bus service in people’s lives; and,

4. The resources available to the City for LEP outreach.

1) Number/Proportion of LEP Persons

CENSUS DATA - The determination of the number of LEP persons is based on the U.S. Census Bureau “S1601: Census Bureau Table” 2023 Estimated data. The table below identifies "language spoken at home by ability to speak English for the population 5 years and over" in the City of Monterey Park.

S1601 2023
Speak only English 12,716 21.8%
Other Language Spoken at Home 45,695 78.2%
Speak English "very well" 23,404 51.2%
Speak English less than "very well" 22,291 48.8%
Total 58,411 100.00% 45,695 100.00%

A breakdown on the language spoken at home is provided in the following table:

Language Spoken

Speak English
"very well"
Speak English
less than
"very well"
Speak only English 12,716
Spanish 9,879

12,987
2,443
Asian and Pacific Island
Languages 34,709

7,436
21,722

Page 338 of 362 ends

Title VI Program Update 2025 Page 9 of 13
Indo-European languages 1,070

877
193
Other languages: 37

31 6
TOTAL 58,411 21,331 24,364

Based on the data, the majority of LEP persons are identified as either speaking Spanish or an Asian/Pacific Island language. While approximately 7 8% speak a language other than English a home, about 41% speak it less than very well. The City currently has staff that can provide verbal and written translation assistance in multiple languages including Chinese, Vietnamese, and Spanish. The City also provides additional translation assistance through the use the Voiance Language Services, a telephone translation service. The City will continue to monitor the number of constituents who require assistance with translation , but at this time the City ’s policy is to require written translation of all vital documents in Spanish and Chinese only.

Currently, the reading level of LEP individuals is unknown. The City takes pride in its Literacy for All of Monterey Park (LAMP) that has been a leader in adult and family literacy programs since 1984. The learner-centered literacy services are provided at no cost. Trained volunteers in one - to-one, small group, and classroom settings provide tutoring and instruction. LAMP provides assistance through volunteer English-as-a-Second Language ( ESL) instructors who have some teaching experience and conduct basic English instruction in all levels of ESL.

2) Frequency with which LEP persons come into contact with the Spirit Bus

The local bus service is contracted out to a private company that operates and maintains the City vehicles. The private firm is also responsible for setting up a customer information phone line for the public to call for information.

The existing contract will terminate on June 30, 20 26. The City works with the contractor to address issues regarding communication with LEP persons.

City staff currently does not track interaction with LEP persons either at the public counter or on the phone due to the rarity of these incidents (e.g., < 10 times per year).

3) The Nature and Importance of the Spirit Bus

The Spirit Bus is a critical public service to the community. Nearly 40 percent of the City's population is 55-year-old and older, and 23 percent are over 65 years old. The seniors depend on the Spirit Bus for transportation for their basic needs: access to food, doctor's appointments and recreation. Through complaints that City receives on a regular basis, staff becomes aware of bus riders’ concerns and needs. Most recently, the City released a community survey to further understand the public’s mobility needs.

Page 339 of 362 ends

Title VI Program Update 2025 Page 10 of 13

City staff’s interaction with LEP individuals is currently not quantitatively tracked. Per the City's Administrative Policy, the City Manager meets with Department Directors on a regular basis to discuss the multi-lingual program and exchange solutions and share resources. City Manager and Director Meetings are held weekly.

4) The Resources Available to LEP Outreach

The City's contract with a publisher to produce its monthly newsletter - Cascades - requires the publication to translate “Featured Stories” into both Spanish and Chinese. The publisher can also provide translation services for other material as needed.

In addition to the Title VI documentation such as the complaint form, procedures and Civil Rights notice, documents that are translated include public suggestion/complaint forms and Dial-A-Ride registration and policy/guidelines. The Spirit Bus schedule and related articles that are published in the Cascades are translated into Spanish and Chinese.

One of the criteria in the hiring of employees who are responsible for interacting directly with the public is proficient Spanish and Chinese language skills. A portion of City staff speak s and understands Spanish or Chinese language, or both. Multi-lingual employees receive incentive pay to translate not only for their own department but also for other departments as necessary.

3. Language Assistance Measures

The Spirit Bus contractor will be required to submit their language assistance program that will be reviewed and approved by the Director of Public Works. The program will address how drivers and customer service representatives respond to passengers who are not proficient in English. The contractor has been informed of the Title VI requirements and has posted the notice on all service vehicles.

4. Training Staff

The Spirit Bus contract will require that drivers and customer service representative receive ongoing trainin g in language assistance. The c ontractor will be required to train all the new employees on the language assistance program.

City staff will receive updated training on the multi -lingual policy that includes providing language identification cards at public counters. New employees will be briefed on the language assistance program as part of their new hire orientation. Staff members who routinely interact with the public will be provided with updated lists of multi -lingual City employees, volunteer translators and interpreters.

5. Providing Notice to LEP Persons

Page 340 of 362 ends

Title VI Program Update 2025 Page 11 of 13

LEP persons are notified of the language services available by notices posted on -board transit vehicles, City Hall, the City website, and at the information kiosk at the Transit Center at East Los Angeles College. Notices will also be available in both Spanish and Chinese.

Vital documents are translated into LEP identified languages. The City's Multilingual Service Plan is attached in Appendix D.

6. Monitoring and Updating the LEP Plan

The City's multi -lingual policy was adopted on December 18, 2003 and requires annual review and updates to ensure that measures are relevant and effective.

Every three years, the City will review census updates and other data to determine any changes in the proportion of LEP groups. Special attention will be paid to the Vietnamese community.

The City will review the c ontractor’s monthly complaint logs and identify any trends in language assistance needs. The City will also review the c ontractor's driver logs of the frequency of encounters with LEP individuals.

Assessment of these reviews will be used to update the LEP Plan.

IV. SERVICE POLICIES AND STANDARDS

The City has the following policies and standards as guidelines to assure the equitable distribution of services and the accessibility of the fixed-route services:

1. Vehicle Assignments/Age of Vehicles

The Spirit Bus fleet includes 9 vehicles: (3) 2018 Arboc Spirit of Mobility, (1) 2015 Arboc low floor cutaway, (3) 2013 El Dorado BRT mid-sized buses, , (1) 2011 El Dorado AeroElite cutaway, and (1) contractor-owned cutaway spare . The City-owned cutaway vehicles are typically assigned to lower ridership routes and the mid -size buses are rotated to the four community routes. No preference is given to any particular route for the assignment of a newer bus.

The City maintains a transit replacement schedule for the Spirit fleet. Five buses are scheduled for replacement in 2026 and 2029.

2. Vehicle Load

Vehicle load is expressed as the ratio of passengers to the total number of seats on a vehicle. The average daily ridership of the Spirit Bus between FY 2023 and FY 202 5 increased by 30%. Larger mid-sized buses are operated on these routes and can seat 23 passenger s. When school lets out,

Page 341 of 362 ends

Title VI Program Update 2025 Page 12 of 13
the load on the buses can exceed 1.0 but at all other times there are no standees on the buses.

The buses seat 23 passengers with standing room for up to 40 adults. Vehicle load is 1.5.

The City currently uses Passio Go app software to collect boarding and alighting data.

3. Vehicle Headways (Frequencies)

Vehicle headway is the amount of time between two buses traveling in a bi-linear direction on a given route. Each of the three community routes - Routes 1, 2, and 3 – typically operates every 40 minutes. The business/employee route - Route 5 - and the Metrolink shuttle operate every 30 minutes. Service times can vary during times of modified or limited service.

4. On-Time Performance

On-time performance is a measure of runs completed as scheduled. The Spirit Bus contract holds the contractor accountable to operating 95% of all trips on -time on any monthly reporting period. On-time is defined as service trip departing less than 10 minutes in advance of scheduled time point and 15 minutes following the scheduled time point.

The contractor is liable for liquated damages for not meeting the standard. All routes must abide by the same performance standards.

5. Transit Access

The Spirit Bus system was designed to provide access to all public facilities including schools, parks and the Civic Center as well as the major commercial corridors. Bus stops locations are at attraction centers such as schools, shopping and business centers, and parks.

Generally, Spirit bu s service is accessible within half mile of any location within the City boundary. However, the steep terrain at certain locations can make access a challenge especially for the elderly.

Minority groups are well distributed within the City.

6. Distribution of Transit Amenities

Transit amenities include shelters, benches and trash containers. The site selection for bus shelters and seating are based on ridership and physical limitations of the bus stop . Nearly all shelters are located along commercial corridors. The maintenance of all shelters and bus stop signs is maintained by City staff. Inspections of these amenities are done on a periodic basis.

Replacement and addition of transit amenities are considered based on available budget resources.

7. Monitoring Service Standards

Page 342 of 362 ends

Title VI Program Update 2025 Page 13 of 13

Monitoring of the service standards is integral to operational planning. Vehicle replacement is included in capital planning that i s reviewed annually when preparing and adopting the fiscal budget. The vehicle load is reviewed when evaluating monthly ridership. Headways relate to the ability to maintain the schedule while on -time performance is monitored daily . Service accessibility and transit amenities are part of the on-going annual planning activities.

V. OTHER PROGRAM SPECIFIC REQUIREMENTS

Equity Analysis for Facility

The City has completed the construction of a Transit Center at East Los Angeles College (ELAC).

The facility was previously an ELAC property that was exchanged with the City for 8 -feet of right- of-way on Collegian Avenue where the Transit Center is located. The removal of the right-of-way lane eliminated on-street parking on the west side of Collegian Avenue. The college utilized the 8 feet right of way to expand their Performing and Fine Arts Complex.

The college property that was exchanged to the City for the Transit Center was previously an open parking lot for college instructors and staff. A 5-story parking structure has since been constructed adjacent to the Transit Center to provide additional parking that was needed for the college's expansion.

The construction of the transit center did not require acquisition of land and did not displace people from homes or places of business and therefore an equity analysis was not conduct

Demographic Service Profile

The City operates five vehicles in peak fixed-route service; therefore, a demographic profile was not prepared for this plan.

Page 343 of 362 ends

Appendix A

Title VI of the Civil Rights Act of 1964

The City of Monterey Park is the recipient of federal transportation funding and operates its programs without regard to race, color and national origin in accordance with Title VI of the Civil Rights Act. Any person who believes that he or she has been aggrieved by any unlawful discriminatory practice under Title VI may file a complaint with the City of Monterey Park. Complainant may file a complaint pertaining to race, color or national origin with the Federal Transit Administration (FTA), Office of Civil Rights, Attention: Complaint Team, East Building, 5th Fl – TCR, 1200 New Jersey Ave., SE, Washington, DC 20590.

For more information on the City of Monterey Park’s civil rights program, and the obligations and procedures to file a complaint, contact (626) 307 -1320, email [email protected] or visit the Public Works Department at 320 W. Newmark Ave., Monterey Park, CA 91754.

If information is needed in another language, contact (626) 307-1320.

1964 公民權利法第 6 項

蒙特利公園市是聯邦運輸資金的接收者,也是負責該項目運作的操作者。根
據公民權利法第 6 項,聯邦運輸資金的接收及操作者 (蒙特利公園市) 不會對
任何種族,膚色及民族血統 存在任何歧視因素。若任何人士認為他/她在此
法規下受到任何不平等歧視時,可向蒙特利公園市政府提出訴訟申請。投訴
人亦可以到聯邦運輸 管理局提出訴訟,地址: Federal Transit Administration
(FTA), Office of Civil Rights, Attention: Complaint Team, East Building, 5th Fl – TCR, 1200 New Jersey Ave., SE, Washington, DC 20590.

若需更多有關蒙特利公園市公民權利法資訊內容,義務和程序來提出訴訟申
請,請聯繫(626)307-1320,或電郵 [email protected],或親 臨公共工程部門查詢詳情,地址:320 W. Newmark Ave., Monterey Park, CA
91754。

若需其他語言資料協助,請電(626)307-1320。

Título VI de la Ley de Derechos Civiles de 1964

La Ciudad de Monterey Park recibe fondos f ederales para el transporte urbano y opera sus programas sin distinción de raza, color y origen nacional en conformidad con las disposiciones del Título VI de la ley de derechos civiles. Cualquier persona que cree que él o ella han sido víctim a de la práctica discriminatoria ilegal bajo el Titulo VI puede presentar su queja con la Ciudad de Monterey Park. Demandante puede presentar una denuncia relacionada a la discriminación por raza, color u origen nacional con la Federal Transit Administration (FTA), Office of Civil Rights, Attention: Complaint Team, East Building, 5th Fl – TCR, 1200 New Jersey Ave., SE, Washington, DC 20590.

Para obtener más información sobre los derechos civiles del programa de la Ciudad de Monterey Park y las obligaciones y procedimientos para presentar una queja, llame al (626) 307-1320, correo electrónico [email protected] o visiten el Departamento de Obras Públicas en 320 W. Newmark Ave., Monterey Park, CA 91754.

Si necesita esta información en otro idioma, llame al (626) 307-1320.

Page 344 of 362 ends

Appendix B

Title VI Discrimination Complaint Procedure

The complaint will be made in writing to the Director of Public Works and will include all information relevant to a determination of discrimination. A complaint must be filed within six (6) months after the alleged discrimination. In cases where the complainant is unable or incapable of providing a written statement, City staff will assist the person in converting verbal complaints to writing. The complainant or his/her representative must sign all complaints.

After review ing the complaint, which may include interviewing all appropriate personnel and the complainant and review of City policies and service standards, the Director of Public Works will make a determination. If it is found that discrimination did not occur, the complainant will be notified in writing and the procedure will be terminated. Notification will occur within ten (10) days of the original submission of the complaint. At that time, the complainant will be advised of his or her right to challenge the decision of the Director of Public Works by submitting a written request for a hearing before the City Manager within five (5) days of the receipt of the determination.

If, after the Director of Public Works' review of the complaint, it is found that discrimination may have occurred, a formal hearing will be held before the City Manager. The claimant will be notified of this determination within ten (10) days of the submission of the complaint. The hearing will occur within five (5) days and will be attended by the Director of Public Works , the City Manager, the complainant and the appropriate personnel. Following the hearing, the City Manager will make a final determination. The complainant will be notified of this determination in writing within ten (10) days of the hearing. If justified, appropriate remedial action will be taken.

If the complainant is not satisfied with the City's decision, the Director of Public Works will advise him/her of their right to submit their complaint to the Federal Transit Administration ( FTA) for further investigation.

If the information is needed in another language, please call (626) 307 -1320.

Page 345 of 362 ends

Appendix C

Title VI Discrimination Complaint Form

Please complete and mail to:

Director of Public Works, City of Monterey Park, 320 W. Newmark Ave., Monterey Park, CA 91754

Name: ___________________________________________________________________________ Street Address and Apt./Unit #:________________________________________________________ City or Town, State and ZIP Code:______________________________________________________ Telephone:________________________________________________________________________ Email:____________________________________________________________________________

Discrimination due to:  Race  Color  National Origin  Sex Age  Disability

Please provide date(s) and location of the alleged discrimination, the name(s) of the individual(s) who allegedly discriminated against you including their titles (if known).___________________________ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________

Please provide the names, addresses and telephone numbers of any witnesses._________________ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________

Explain as briefly and as clearly as possible what happened, how you feel that you were discriminated against and who was involved. Please include how other persons were treated differently from you._____________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________

_________________________________________________________________________________ Signature (Optional) Date

Include additional sheets of paper and other supporting document as necessary.

Page 346 of 362 ends

標題VI歧視投訴程序

投訴需要以書面方式遞交予市政府公共工程總監,必須包括相關的所有資料及文件以便測定
歧視問題。涉嫌歧視的投訴必須於事件發生後六個月內提交。如投訴人無法提供一份書面聲
明,市政府工作人員將協助該投訴人作出口頭陳述的書面投訴。投訴人或他/她的代表將簽署
所有投訴書。

市政府審查過程將包括與所有相關的市政府人員面談以及審查市政府的政策和服務標準,市
政府公共工程總監將於投訴和審查面談後確定歧視投訴是否成立。倘若發現歧視行為並不存
在,投訴人將於提交申訴後十天內收到書面通知,審查程序亦將被終止。投訴人在收到書面
通知後亦有權利於五天內提交書面請求提出異議並要求於聽證會上向城市管理處處長提出申
訴。

倘若市政府公共工程總監審查投訴後,發現歧視可能發生,市政府公共工程總監審將會召開
正式聽證會並由城市管理員主持。申請人會於提交申訴後十天收到舉行聽證會決定通知。聽
證會將於五日內舉行,出席人士包括市政府公共工程總監、城市管理處處長、投訴人及相關
的市政府人員。在聽證會上,城市管理處處長將做出最終決定。投訴人將於聽證會後十天內
收到書面形式的決定通知。倘若發現歧視確實存在,市政府將採取合理適當的補救行動。

如果投訴人不滿意城市的決定,市政府會建議他/她的行駛權利並向聯邦運輸管理局提交投訴
作進一步調查。

如果需要另一種語言的歧視投訴程序信息,請致電(626)307-1320。

Page 347 of 362 ends

標題VI歧視投訴程序表格

請填寫並郵寄至:
Director of Public Works
City of Monterey Park
320 W. Newmark Ave., Monterey Park, CA 91754

姓名: ___________________________________________________________________________ 街道地址和公寓/單位#:________________________________________________________ 市或鎮,州和郵政編碼:______________________________________________________ 電話:________________________________________________________________________ 電子郵件:_________________________________________________________________________

歧視原因:  種族 膚色 國家原生地 性別 年齡 殘疾
請提供發生歧視的日期和地點,涉嫌歧視的市政府工作人員名字以及他們的市政府職位:
_________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________

請提供任何證人的姓名,地址和電話號碼:____________________________________________ _________________________________________________________________________________ _________________________________________________________________________________

請簡要解釋並盡可能清楚說明發生了什麼事,為什麼你覺得自己受到了歧視及誰參與此
歧視行為? 請解釋涉嫌歧視你的工作人員對待你和其他人有什麼分別? ____________________
_________________________________________________________________________________ _________________________________________________________________________________

_________________________________________________________________________________ 簽名 日期

請包括其他必要的證明文件。

Page 348 of 362 ends

Título VI – Procedimiento para Quejas de Discriminación

La queja se hará por escrito al Director de Obras Públicas y deberá incluir toda la información pertinente a una determinación de discriminación. La queja debe de ser presentada dentro de un término de seis (6) meses de la presunta discriminación. En casos en que el demandante no pueda o sea incapaz de proporcionar una declaración escrita, empleados de la ciudad le ayudarán a convertir la queja verbal a queja escrita. El demandante o su representante firmarán todas las quejas.

Después de revisar la queja, que incluirá entrevistar a todo el personal apropiado y al demandante, y de revisar las pólizas de la ciudad y los servicios habituales, el Director hará la determinación de la discriminación. Si se encuentra que la discriminación no ocurrió, el demandante será notificado por escrito y el procedimiento será terminado. La notificación será hecha dentro de un término de diez (10) días de la presentación de la queja. Al mismo tiempo, el demandante será aconsejado sobre su derecho de disputar la decisión del Director enviando una petición escrita solicitando una audiencia ante el Administrador de la Ciudad , dentro de un término de cinco (5) días después de recibir la determinación.

Si después que el Director ha revisado la queja, y encuentra que la discriminación puede haber ocurrido, se llevará a cabo una audiencia formal en la presencia del Administrador de la Ciudad . El demandante será notificado de ésta determinación dentro de un término de diez (10) días después de la presentación de la queja. La audiencia se llevará a cabo dentro de un término de cinco (5) días y estarán presentes el Director, el Administrador de la Ciudad, el demandante y el personal apropiado.

Después de la audiencia, el Administrador de la Ciudad hará la determinación definitiva. El demandante será notificado por escrito sobre ésta determinación dentro de un término de diez (10) días después de la audiencia. Se tomará acción correctiva, si es justificada.

Si el demandante no está satisfecho con la decisión de la ciudad, el Director le aconsejará sobre su derecho de enviar su queja a la oficina de la Administración Federal de Transporte (FTA) para más investigación.

Si necesita la información en otro idioma, por favor llame al (626) 307 -1320.

Page 349 of 362 ends

Title VI – Forma para Queja de Discriminación

Por favor completar y enviar al:

Director of Public Works
City of Monterey Park
320 W. Newmark Ave., Monterey Park, CA 91754

Nombre: _______________________________________________________________________ Dirección y # de Apt./Unidad:_________________________ _____ _ _ Ciudad, Estado y Codigo Postal:_______________________________________ _ Teléfono:___________________________________________________________________ _____ Email:____________________________________________________________________________

Discriminación de:  Raza  Color  Origen Nacional  Sexo Edad  Discapacidad

Proporcione fecha(s) y lugar de la supuesta discriminación, el nombre(s) de la persona(s) que supuestamente discriminó contra usted incluyendo sus títulos (si los sabe). _____________________ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________

Proporcione nombres, direcciones y números de teléfonos de testigos. _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________

Explique breve y claramente qué pasó, cómo se sintió al ser discriminado y quién estuvo involucrado.

Explica como otras personas fueron tratadas de distinta manera que usted. __________________________________________________________ ______ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ Firma (Opcional) Fecha

Incluya páginas adicionales y otros documentos de respaldo como sean necesarios.

Page 350 of 362 ends

City Council Staff Report

Date: December 17, 2025
Agenda Item Number: 9.J.

To: The Honorable Mayor and City Council
From: Jason Hing, Fire Chief
Michelle Marquez, Principal Management Analyst
Subject: Amendment to Agreement No. 2488-AD with SVT Fleet Solutions, LLC

Recommendation:

It is recommended that the City Council consider:

1. Authorizing the City Manager to execute an amendment to Agreement No. 2454-AD with SVT Fleet Solutions, in a form approved by the City Attorney, for maintenance and repair of fire engines, quint and other emergency vehicles for an amount not to exceed $176,000 through June 30, 2027;

2. Taking such additional, related, action that may be desirable.

Executive Summary:

Currently, the Fire Department has a maintenance contract with SVT Fleet Solutions, LLC for the maintenance and repairs of the Department’s emergency vehicles in an amount not to exceed $58,000 for FY 2025–26. While no immediate repair needs exist, ensuring that our emergency vehicles remain service-ready is critical for uninterrupted emergency response operations. Given current industry conditions, including rising costs, supply-chain disruptions, and frequent backorders of parts, it is prudent to amend the contract. This will allow the Department to respond promptly should unforeseen maintenance or repair needs arise, without delay.

As a precautionary measure, the Fire Chief (“Chief”) is requesting approval of a contract amendment that would provide the necessary flexibility to address unforeseen maintenance or repair needs without delay and extend the contract term through June 30, 2027, ensuring continuity of services across fiscal years.

Background:

The Fire Department (“Department”) has historically contracted with SVT Fleet Solutions (formerly known as SoCal Fleet), a trusted vendor with extensive experience servicing emergency response vehicles. Due to natural wear and tear on the fleet, several Department vehicles required extensive repairs within the last year. An increase to the contract was

Page 351 of 362 ends

approved last fiscal year; however, it was not fully expended because repairs for one engine were not completed until the current fiscal year.

As a regional Urban Search and Rescue (USAR) team, MPFD provides specialized capabilities for complex emergencies and disasters. Within the last year, the Department assisted two regional strike teams, which added additional wear and tear to the fleet. In mid- December 2024, the Department deployed an engine and fire suppression staff to assist with the Franklin Fire in Malibu. In January, the Department deployed another engine and fire suppression staff to assist with the Palisades Fire. Routine maintenance is critical to ensure emergency vehicles remain reliable both within the City of Monterey Park and when deployed on regional strike teams. The Department also receives mutual aid reimbursement for these deployments, which includes personnel costs, equipment usage, and an administrative surcharge. This reimbursement offsets a portion of operational costs associated with regional responses.

The Fire Chief is recommending an amendment to Agreement No. 2488-AD to add $118,000 and extend the contract through June 30, 2027, increasing the total not-to-exceed amount to $176,000.

Strategic Plan Goal:

The proposed amendment meets the City’s goal to maintain public safety with a flexible and enhanced service model. By ensuring the Department’s emergency fleet is properly maintained and mission-ready, the City can continue to provide reliable and effective emergency response service.

Fiscal Impact:

The cost to amend the current agreement with SVT Fleet Solutions, LLC is $118,000 through June 30, 2027. The Fiscal Year 2025-2026 budget has sufficient funds to support the proposed amendment. Funding for the maintenance and repair of fire emergency vehicles is included in the budget process.

Attachments:

None

Page 352 of 362 ends

City Council Staff Report

Date: December 17, 2025
Agenda Item Number: 9.K.

To: The Honorable Mayor and City Council
From: Jason Hing, Fire Chief
Subject: Recognition of January 11, 2026 as National Human Trafficking Awareness Day

Recommendation:

It is recommended that the City Council consider:

1. Adopting a Resolution recognizing January 11, 2025, as National Human Trafficking Awareness Day and;

2. Taking such additional, related, action that may be desirable.

Executive Summary:

National Human Trafficking Awareness Day, observed annually on January 11th, is an initiative aimed at spotlighting the issue of human trafficking. The campaign seeks to educate communities, empower individuals to recognize signs of trafficking, and inspire collective action to prevent and combat this contemporary form of slavery. By designating a specific day, the initiative brings attention to the issue of human trafficking, encouraging diverse stakeholders, including government entities, law enforcement, non-profit organizations, businesses, and the general public, to actively engage in initiatives combating human trafficking.

On January 11, 2026 city staff, elected officials and residents are encouraged to wear blue attire in honor of National Human Trafficking Awareness Day, symbolizing unity and raising visibility for the cause. By combining awareness, education, community engagement, and strategic partnerships, the City actively contributes to the collective effort to eliminate this violation of human rights.

Background:

The Blue Campaign was launched by the U.S. Department of Homeland Security in 2010 as a national public awareness effort dedicated to combating human trafficking. The campaign focuses on providing educational resources, training programs, and support services for victims, fostering collaboration, and engaging the private sector in ethical practices. Initiatives such as Wear Blue Day encourage public participation, symbolizing solidarity and raising awareness about human trafficking.

Page 353 of 362 ends

Strategic Plan Goal:

The proposed action supports the City’s goals to Enhance Public Communication and Civic Engagement and Expand Access to Community Resources and Services by increasing public awareness of human trafficking, promoting community education, and strengthening partnerships with regional, state, and federal agencies. Recognizing National Human Trafficking Awareness Day encourages community involvement, enhances outreach efforts, and supports efforts to improve safety and well-being for all residents.

Fiscal Impact:

There is no fiscal impact associated with adopting this resolution.

Attachments:

1. Resolution - Human Trafficking Day

Page 354 of 362 ends

Staff Report
December 17, 2025

ATTACHMENT 1
Resolution

Page 355 of 362 ends

Resolution No.

Page 1 of 3 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
MONTEREY PARK RECOGNIZING JANUARY 11, 2026 AS

NATIONAL HUMAN TRAFFICKING AWARENESS DAY

BE IT RESOLVED by the Council of the City of Monterey Park as follows:

SECTION 1: The City Council finds as follows:

A. Human trafficking is a heinous crime that violates the basic human rights of its victims, exploiting them for forced labor, sexual exploitation, and other forms of modern-day slavery.

B. The City of Monterey Park is committed to promoting awareness, preventing, and combating human trafficking within its borders.

C. National Human Trafficking Awareness Day is observed annually on January 11, serving as a vital reminder of the urgent need to address this global issue.

D. This day provides an opportunity for communities, organizations, and individuals to come together to raise awareness, educate the public, and take action to prevent and combat human trafficking.

E. It is crucial to acknowledge the tireless efforts of law enforcement, non-profit organizations, and advocates who work relentlessly to rescue victims, prosecute offenders, and raise awareness about human trafficking.

F. By recognizing National Human Trafficking Awareness Day, the City of Monterey Park aims to contribute to a collective effort to eliminate this grave violation of human dignity.

G. Promoting awareness is crucial to the prevention and elimination of human trafficking within our city and an informed community is better equipped to identify and report instances of human trafficking, support victims, and collaborate with law enforcement agencies and non-profit organizations

H. The City of Monterey Park encourages all residents, businesses, schools, and community organizations to participate in events, educational programs, and initiatives aimed at raising awareness about human trafficking and supporting efforts to combat it.

Page 356 of 362 ends

Resolution No.

Page 2 of 3 ends

I. The City of Monterey Park expresses its gratitude to all individuals and organizations actively working towards eradicating human trafficking and commits to continuing its efforts to create a community where the rights and dignity of every individual are upheld.

SECTION 2: Electronic Signatures. This Resolution may be executed with electronic signatures in accordance with Government Code §16.5. Such electronic signatures will be treated in all respects as having the same effect as an original signature.

SECTION 3: Recordation. The Mayor, or presiding officer, is authorized to sign this Resolution signifying its adoption by the City Council of the City of Monterey Park and the City Clerk, or her duly appointed deputy, may attest thereto.

SECTION 4: Effective Date. This Resolution will become effective immediately upon adoption and will remain effective unless repealed or superseded.

PASSED AND ADOPTED this 17th day of December 2025.

________________________________
Elizabeth Yang, Mayor

Attest:

__________________________
Maychelle Yee, City Clerk

Page 357 of 362 ends

Resolution No.

Page 3 of 3 ends

State of California )
County of Los Angeles) §.

City of Monterey Park )

I, Maychelle Yee, City Clerk of the City of Monterey Park, California, do hereby certify that the foregoing Resolution No. was duly and regularly adopted by the City Council of the City of Monterey Park at a regular meeting held on the 17 th day of December, 2025, by the following vote:

Ayes: Council Members:

Noes: Council Members:

Absent: Council Members:

Abstain: Council Members:

Dated this 17th day of December 2025.

Maychelle Yee, City Clerk
Monterey Park, California

Page 358 of 362 ends

City Council Staff Report

Date: December 17, 2025
Agenda Item Number: 11.A.

To: The Honorable Mayor and City Council
From: Shawn Igoe, Public Works Director
Subject: Atlantic Boulevard Bike Lanes

Recommendation:

It is recommended that the City Council consider:

1. Providing direction on the installation of bike lanes on S. Atlantic Boulevard between Newmark Avenue and Harding Avenue; and

2. Taking such additional, related, action that may be desirable.

Executive Summary:

There is an opportunity for the City to consider extending bicycle infrastructure along South Atlantic Boulevard between Newmark and Harding Avenues. This corridor is identified in the San Gabriel Valley Bike Master Plan as a key north–south connection, ultimately linking to Avenida Cesar Chavez, Riggins Street, 1st Street, Mednik Avenue, and the regional Los Angeles County bike network. Current projects on Garvey Avenue and Monterey Pass Road/Mabel Avenue also converge onto South Atlantic, making this segment essential for completing both local and regional connectivity. Installing a protected bike lane would advance the City’s active transportation goals, improve rider safety, and fulfill regional planning commitments.

The decision carries trade offs. A protected bike lane requires removal of approximately 56 on street parking spaces; however, most businesses along the affected corridor maintain on site parking lots, which may mitigate the impact. Atlantic is scheduled for resurfacing following completion of the water project, creating a unique opportunity to stripe the roadway now— either with a bike lane or without one. If the City defers the decision, future installation would require grinding out existing striping, damaging asphalt, blocking travel lanes, and incurring significant restriping costs. Council direction is therefore needed to determine whether to proceed with the protected bike lane or preserve existing parking supply.

Background:

In 2014, the City of Monterey Park partnered with BikeSGV, and the Cities of Baldwin Park, San Gabriel, El Monte and South El Monte to develop the San Gabriel Valley Bicycle Master

Page 359 of 362 ends

Plan (“Bike Plan”). The plan guides the creation and maintenance of a comprehensive bicycle network for the next 20 years with bicycling promotion, education and supportive policies. The City uses the Bike Plan as a guide when considering bicycle infrastructure as part of capital improvements throughout the City.

Currently, the proposed Garvey Avenue Improvement Project will introduce bike lanes connecting Newmark Ave. to Atlantic Blvd., while the Monterey Pass Project will extend bike lanes from Monterey Pass Road/ Mabel Ave. to Newmark Ave. These projects converge onto South Atlantic Blvd., making it a critical corridor for bicycle connectivity. The Bike Plan identifies South Atlantic Blvd. as a key north–south route, extending all the way to Avenida Cesar Chavez, where it connects with lanes from Riggins St., then to 1st Street, and ultimately to the Los Angeles bike lane on Mednik Ave. and the regional LA County network. Connecting bike lanes to South Atlantic Blvd. is therefore a critical part of the City’s north–south bicycle infrastructure.

Atlantic Blvd. is scheduled for resurfacing following completion of the Atlantic/Garfield Water Improvement project, creating a unique opportunity to stripe the roadway now—either with a bike lane or without one. Installing a protected bike lane would advance the City’s active transportation goals, improve rider safety, and fulfill regional planning commitments. Additional considerations for this improvement include:

• Protected lanes improve rider safety and complete critical links in the citywide bicycle network.
• Extending bike lanes onto South Atlantic Blvd. fulfills the San Gabriel Valley Bike Master Plan and connects to the regional LA County network.
• South Atlantic Blvd. is a critical part of the north–south connection of the City’s bicycle infrastructure.
• Striping now avoids future disruption, asphalt damage, lane closures, and added restriping costsInstallation of bike infrastructure reinforces the City’s prioritization of active transportation in the City

However, there are a few issues to consider regarding installation of a protected bike lane along this corridor:

Concerns:

South Atlantic Blvd. currently has a posted speed limit above 30 mph. While some cities use “sharrows” (shared lane markings consisting of a bicycle symbol with chevrons to indicate that bicycles and vehicles share the same travel lane), California law now prohibits their use on roads with speed limits greater than 30 mph. Specifically, Senate Bill 1216 (2024) bars agencies from installing sharrows on such corridors due to safety concerns. As a result, the only compliant option for South Atlantic is a protected bike lane consisting of a five foot lane with a three foot buffer.

In addition, installing this bike infrastructure would eliminate 56 on street parking spaces between Newmark and Harding. However, most businesses along the corridor maintain on site parking lots, which may reduce the overall impact of removing street parking.

Page 360 of 362 ends

The Public Works Director seeks Council direction on the potential installation of bike infrastructure along Atlantic at this time. The direction will determine if the road should be striped with a protected bike lane or left without a bicycle facility at this time.

If the City defers the decision, future installation of bike lanes would require grinding out existing striping, damaging asphalt, blocking travel lanes during construction, and incurring significant restriping costs. Striping now as part of the paving project avoids these costs and disruptions.

Strategic Plan Goal:

This Project meets the City’s goal to maintain, build and modernize infrastructure and facilities to support the current and future needs of our City and community. The proposed bike lanes are part of the regional Bike Plan and the City’s commitment to promote active transportation

Page 361 of 362 ends

including bike lanes.

Fiscal Impact:

If Council recommends the installation of bike lanes along Atlantic, the striping will be completed as part of planned striping following resurfacing under the current Atlantic/Garfield water project. The project is funded in FY 25-26 CIP # 96057.

Attachments:

None